Sample records for brood program fy

  1. Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffnagle, Timothy L.; Hair, Don; Carmichael, Richard W.

    2004-07-01

    BPA Fish and Wildlife Program Project Number 1998-01-001 provides funding for the Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program. This report satisfies the requirement that an annual report be submitted for FY 2003. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, these fish are spawned (within stocks) and their progeny reared to smoltification before being released into themore » natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. This report covers activities conducted and provides data analyses for the Grande Ronde Spring Chinook Salmon Captive broodstock Program from 1 January--31 December 2003. Since the fiscal year ends in the middle of the spawning period, an annual report based on calendar year is more logical. This document is the FY 2003 annual report. Detailed information on historic and present population status, project background, goals and objectives, significance to regional programs and relationships to other programs, methods and previous results are available in the 1995-2002 Project Status Report (Hoffnagle et al 2003).« less

  2. Federal Funding for Health Security in FY2018.

    PubMed

    Watson, Crystal; Watson, Matthew; Kirk Sell, Tara

    This article is the latest in an annual series analyzing federal funding for health security programs. It examines proposed funding in the President's Budget Request for FY2018 and provides updated amounts for FY2017 and actual funding for FY2010 through FY2016. The proposed FY2018 budget for health security-related programs represents a significant decrease in funding from prior years and previous administrations. In total, the President's proposed FY2018 budget includes $12.45 billion for health security-related programs, an estimated decrease in funding of $1.25 billion, or 9%, from the estimated $13.71 billion in FY2017 and an 11% decrease from the FY2016 actual funding level of $13.99 billion. Most FY2018 health security funding ($6.67 billion, 54%) would go to programs with multiple-hazard and preparedness goals and missions, representing a 14% decrease in this funding compared to FY2017. Radiological and nuclear security programs would receive 20% ($2.48 billion) of all health security funding, a slight decrease of 2% from the prior year. Biosecurity programs would be funded at $1.53 billion (12% of health security funding) in FY2018, a decrease of 6% compared to FY2017. Chemical security programs would represent 3% ($389.7 million) of all health security funding in FY2018, a 9% decrease from the prior year. Finally, 11% of health security funding ($1.39 billion) would be dedicated to pandemic influenza and emerging infectious diseases programs, the only category of funding to see an increase (3%) above FY2017.

  3. Survival of Western Sandpiper broods on the Yukon-Kuskokwim Delta, Alaska

    USGS Publications Warehouse

    Ruthrauff, D.R.; McCaffery, B.J.

    2005-01-01

    The rate of chick growth in high-latitude breeding shorebirds is rapid, but little is known about the effect of chick mass, growth, and brood movements on subsequent brood survival. To address these topics, we monitored chick growth patterns, daily brood movements, and survival of Western Sandpipers (Calidris mauri) on the Yukon-Kuskokwim Delta, Alaska. We assessed the effect of chick age, mass, and hatch date on brood survival using Program MARK. We mapped brood locations daily, and compared brood movement patterns between successful and unsuccessful broods. Younger chicks survived at lower rates and moved shorter distances than older chicks. The overall probability of one or more chicks from a brood surviving to 15 days of age was 0.73 ± 0.05 SE. Brood survival declined seasonally, and broods with heavier chicks survived at higher rates than those with lighter chicks. On average, successful broods fledged 1.7 ± 0.1 SE chicks. Rate of chick growth was intermediate between those of high arctic and temperate-breeding shorebirds, and chick mass at hatching declined seasonally. Western Sandpiper brood survival was lowest when chicks were young, spatially clumped, and unable to maintain homeothermy, probably because young chicks were more vulnerable to both complete depredation events and extreme weather. Our data suggest that larger, older chicks are able to avoid predators by being spatially dispersed and highly mobile; thermal independence, achieved after approximately day five, enables chicks to better endure prolonged periods of cold and low food availability.

  4. Federal funding for health security in FY2015.

    PubMed

    Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew

    2014-01-01

    Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs.

  5. Federal Funding for Health Security in FY2015

    PubMed Central

    Sell, Tara Kirk; Watson, Matthew

    2014-01-01

    Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. PMID:24988432

  6. Structural Mechanics Division research and technology plans for FY 1990 and accomplishments for FY 1989

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1990-01-01

    The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  7. Structures and Dynamics Division research and technology plans for FY 1986 and accomplishments for FY 1985

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1986-01-01

    Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  8. Satellite Power System (SPS) FY 79 program summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.

  9. Structures and Dynamics Division research and technology plans for FY 1988 and accomplishments for FY 1987

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1988-01-01

    Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  10. Structures and Dynamics Division research and technology plans for FY 1987 and accomplishments for FY 1986

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1987-01-01

    This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  11. Structures and Dynamics Division research and technology plans for FY 1985 and accomplishments for FY 1984

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1985-01-01

    The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.

  12. Enhanced surveillance program FY97 accomplishments. Progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauzy, A.; Laake, B.

    1997-10-01

    This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics;more » diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.« less

  13. FY 1998 Proposed Rail Improvement Program Supplement

    DOT National Transportation Integrated Search

    1997-01-01

    This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...

  14. 78 FR 17281 - Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... DEPARTMENT OF STATE [Public Notice 8241] Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program There will be a meeting on the President's FY 2014 U.S. Refugee Admissions Program on... meeting's purpose is to hear the views of attendees on the appropriate size and scope of the FY 2014 U.S...

  15. National Water Program FY 2015 Performance, Trends and Best Practices Report

    EPA Pesticide Factsheets

    This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.

  16. National Water Program Performance FY 2017 Trends, and Best Practices Report

    EPA Pesticide Factsheets

    This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.

  17. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less

  18. Tucannon River Spring Chinook Salmon Captive Broodstock Program, Annual Report 2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallinat, Michael P.; Bumgarner, Joseph D.

    2002-05-01

    This report summarizes the objectives, tasks, and accomplishments of the Tucannon River spring chinook captive brood during 2001. The WDFW initiated a captive broodstock program in 1997. The overall goal of the Tucannon River captive broodstock program is for the short-term, and eventually long-term, rebuilding of the Tucannon River spring chinook salmon run, with the hope that natural production will sustain itself. The project goal is to rear captive salmon selected from the supplementation program to adults, spawn them, rear their progeny, and release approximately 150,000 smolts annually into the Tucannon River between 2003-2007. These smolt releases, in combination withmore » the current hatchery supplementation program (132,000 smolts) and wild production, are expected to produce 600-700 returning adult spring chinook to the Tucannon River each year from 2005-2010. The captive broodstock program will collect fish from five (1997-2001) brood years (BY). The captive broodstock program was initiated with 1997 BY juveniles, and the 2001 BY fish have been selected. As of Jan 1, 2002, WDFW has 17 BY 1997, 159 BY 1998, 316 BY 1999, 448 BY 2000, and approximately 1,200 BY 2001 fish on hand at LFH. The 2001 eggtake from the 1997 brood year (Age 4) was 233,894 eggs from 125 ripe females. Egg survival was 69%. Mean fecundity based on the 105 fully spawned females was 1,990 eggs/female. The 2001 eggtake from the 1998 brood year (Age 3) was 47,409 eggs from 41 ripe females. Egg survival was 81%. Mean fecundity based on the 39 fully spawned females was 1,160 eggs/female. The total 2001 eggtake from the captive brood program was 281,303 eggs. As of May 1, 2002 we have 171,495 BY 2001 captive brood progeny on hand. A total of 20,592 excess fish were marked as parr (AD/CWT) and will be released during early May, 2002 into the Tucannon River (rkm 40-45). This will allow us to stay within our maximum allowed number (150,000) of smolts released. During April 2002, WDFW volitionally released 3,055 BY 2000 captive broodstock progeny from Curl Lake Acclimation Pond into the Tucannon River. These fish were marked with agency-only wire tags and no fin clips in order to differentiate them from the supplementation fish (CWT/Right Red VI/No Finclip). Monitoring their survival and future releases to adult returns, along with future natural production levels, will determine the success or failure of this captive broodstock program.« less

  19. Research and technology plans for FY 1989 and accomplishments for FY 1988. [Structural Mechanics Division

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1989-01-01

    The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  20. United States Nuclear Data Program (USNDP)

    Science.gov Websites

    Report FY 2016 Annual Report FY 2015 Annual Report FY 2014 Annual Report FY 2013 Annual Report FY 2012 Annual Report FY 2011 Annual Report FY 2010 Annual Report FY 2009 Annual Report FY 2008 Annual Report FY 2007 Annual Report FY 2006 Annual Report FY 2005 Annual Report FY 2004 Final Report FY 2003 Final

  1. 76 FR 35918 - Susan Harwood Training Grant Program, FY 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2011. Funding Opportunity No.: SHTG-FY-11... of approximately $4.7 million for Susan Harwood Training Program grants under the following...

  2. 75 FR 29783 - Susan Harwood Training Grant Program, FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $8 million for the Susan Harwood Training Grant Program for Capacity Building...

  3. 75 FR 38837 - Susan Harwood Training Grant Program, FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $2.75 million for the Susan Harwood Training Grant Program for Targeted Topic...

  4. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  5. Analysis of Rotary Aircraft Alternatives for NATO SOF Organic Air Wing

    DTIC Science & Technology

    2012-06-01

    analysis with an assumed program start in 2013 and an end in 2019 to determine the impact of short program duration on platform selection. D...FY12 GO\\ LR,~itl\\ l Sli LABOR H13 (J()VI R\\\\iFI\\TSE I AROR FY14 GOVLR\\\\iLI\\ I Sl:. LABOR H15 SI:.PO CSS FY II SII’O CSS FY 12 SEI’() CSS fY 13

  6. 77 FR 5617 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... selection of projects, funded with Fiscal Year (FY) 2011 and 2012 appropriations, and previously unallocated... Program FY 2011 FY 2012 Appropriation $26,844,035 $13,450,000 Oversight Deduction (0.5%) (134,500) (67,530... the program are to conserve natural, historical, and cultural resources; reduce congestion and...

  7. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  8. An Assessment of Operational Energy Capability Improvement Fund (OECIF) Programs 17-S-2544

    DTIC Science & Technology

    2017-09-19

    persistently attack key operational energy problems . OECIF themes are summarized in Table 1, and Appendix A includes more detail on the programs within... problems FY 2014 Analytical methods and tools FY 2015 Improving fuel economy for the current tactical ground fleet FY 2016 Increasing the operational...involve a variety of organizations to solve operational energy problems . In FY 2015, the OECIF program received a one-time $14.1M Congressional plus-up

  9. Annual Report 1984.

    DTIC Science & Technology

    1985-01-01

    equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service

  10. 76 FR 23272 - FY 2011 Emergency Food Assistance Annual Program Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Emergency Food Assistance Annual Program Statement Pursuant to the Food for Peace Act of 2008 and the Foreign Assistance Act of 1961 (FAA), notice is hereby given that the FY 2011 Emergency Food Assistance... to review, the FY 2011 Emergency Food Assistance Annual Program Statement is available via the Food...

  11. Materials Division research and technology accomplishments for FY 87 and plans for FY 88

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1988-01-01

    The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  12. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  13. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  14. Materials Division research and technology accomplishments for FY 89 and plans for FY 90

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1990-01-01

    The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  15. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  16. Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1989-01-01

    The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.

  17. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  18. Federal agency biodefense funding, FY2012-FY2013.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2012-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2012. This article updates those figures with budgeted amounts for FY2013, specifically analyzing the budgets and allocations for civilian biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. As in previous years, our analysis indicates that the majority (>90%) of the "biodefense" programs included in the FY2013 budget have both biodefense and non-biodefense goals and applications-that is, programs to improve infectious disease research, public health and hospital preparedness, and disaster response more broadly. Programs that focus solely on biodefense represent a small proportion (<10%) of our analysis, as the federal agencies continue to prioritize all-hazards preparedness. For FY2013, the federal budget for programs focused solely on civilian biodefense totals $574.2 million, and the budget for programs with multiple goals and applications, including biodefense, is $4.96 billion, for an overall total of $5.54 billion.

  19. Laboratory Directed Research and Development Program FY 2006 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sjoreen, Terrence P

    2007-04-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about themore » FY 2006 projects and an internal evaluation of the program's management process.« less

  20. 76 FR 16388 - Fees for Reviews of the Rule Enforcement Programs of Contract Markets and Registered Futures...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... charges fees to designated contract markets and registered futures associations to recover the costs..., as explained below. The FY 2010 fee includes adjustments to program costs incurred in FY 2008 and 2009, which are being revised as a result of an internal review of program costs. The FY 2010 fee...

  1. Financial Management for the Office of the Civilian Health and Medical Program of the Uniformed Services

    DTIC Science & Technology

    1996-12-27

    consolidated financial statements for FY 1996. The Office of Civilian Health and Medical Program of the Uniformed Services (OCHAMPUS), part of the FY 1995...12.3 billion Defense Health Program, is one of the entities that DoD will include in its FY 1996 consolidated financial statements . The OCHAMPUS

  2. Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education

    ERIC Educational Resources Information Center

    Alliance for Excellent Education, 2006

    2006-01-01

    This document presents a chart titled "Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education." It divides into five columns: (1) "No Child Left Behind" Programs (and Other Reauthorizations); (2) FY 2006 Final Appropriation; (3) FY 2007 Bush Budget; (4) FY 2007 House…

  3. 75 FR 21314 - Medicaid Program; Final FY 2008, Revised Preliminary FY 2009, and Preliminary FY 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... DSH expenditures (mental health facility plus inpatient hospital) applicable to the FY 1995 DSH...

  4. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  5. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  6. 75 FR 3752 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009 HOPE VI Main Street Grants Program... posted its HOPE VI Main Street Grants program NOFA for FY2009 (``NOFA''). The NOFA makes available approximately $4 million in assistance for the HOPE VI Main Street Grants program, which was funded through the...

  7. Do adjusted clinical groups eliminate incentives for HMOs to avoid substance abusers? Evidence from the Maryland Medicaid HealthChoice program.

    PubMed

    Ettner, Susan L; Johnson, Steven

    2003-01-01

    The adequacy of risk adjustment to eliminate incentives for managed care organizations (MCOs) to avoid enrolling costly patients had been questioned. This study explored systematic differences in expenditures between beneficiaries with and without substance disorders assigned to the same capitation rate group under the Maryland Medicaid HealthChoice program. The investigators used fiscal year (FY) 1995 to 1997 Medicaid data to assign beneficiaries to rate cells based on FY 1995 diagnoses and compared the distribution of expenditures for beneficiaries with and without substance disorders, defined using FY 1997 and FY 1995 diagnoses. Results showed that differences in FY 1997 expenditures between beneficiaries with and without FY 1995 substance disorders were negligible. However, MCOs could expect greater average losses and lower average profits on beneficiaries with FY 1997 substance disorders. Thus, the adjusted clinical groups methodology used to adjust capitation payments in the HealthChoice program attenuated, but did not eliminate, financial incentives for MCOs to avoid substance abusers.

  8. Assessing Greater Sage-Grouse Selection of Brood-Rearing Habitat Using Remotely-Sensed Imagery: Can Readily Available High-Resolution Imagery Be Used to Identify Brood-Rearing Habitat Across a Broad Landscape?

    PubMed

    Westover, Matthew; Baxter, Jared; Baxter, Rick; Day, Casey; Jensen, Ryan; Petersen, Steve; Larsen, Randy

    2016-01-01

    Greater sage-grouse populations have decreased steadily since European settlement in western North America. Reduced availability of brood-rearing habitat has been identified as a limiting factor for many populations. We used radio-telemetry to acquire locations of sage-grouse broods from 1998 to 2012 in Strawberry Valley, Utah. Using these locations and remotely-sensed NAIP (National Agricultural Imagery Program) imagery, we 1) determined which characteristics of brood-rearing habitat could be used in widely available, high resolution imagery 2) assessed the spatial extent at which sage-grouse selected brood-rearing habitat, and 3) created a predictive habitat model to identify areas of preferred brood-rearing habitat. We used AIC model selection to evaluate support for a list of variables derived from remotely-sensed imagery. We examined the relationship of these explanatory variables at three spatial extents (45, 200, and 795 meter radii). Our top model included 10 variables (percent shrub, percent grass, percent tree, percent paved road, percent riparian, meters of sage/tree edge, meters of riparian/tree edge, distance to tree, distance to transmission lines, and distance to permanent structures). Variables from each spatial extent were represented in our top model with the majority being associated with the larger (795 meter) spatial extent. When applied to our study area, our top model predicted 75% of naïve brood locations suggesting reasonable success using this method and widely available NAIP imagery. We encourage application of our methodology to other sage-grouse populations and species of conservation concern.

  9. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Will

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less

  10. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, Gordon John

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  11. The America Supports You Program

    DTIC Science & Technology

    2008-12-12

    Federal Acquisition Regulation Part 31 and appropriation laws. (finding C). The American Forces Information Service, working under the authority...adequacy of program funding in the FY 2007-2009 [sic] as submitted in the American Forces Information Service budget estimate submission. The ASD (PA) in...From FY 2005 through FY 2007, the ASY program received $9.2 million of appropriated funds from American Forces Information Service (AFIS) and from the

  12. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2007-03-01

    This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

  13. Notification: Background Investigation Services Project Notification US Virgin Islands Environmental Program Evaluation

    EPA Pesticide Factsheets

    Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.

  14. 75 FR 10219 - Solicitation of Applications for the FY 2010 University Center Economic Development Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... of accredited institutions of higher education for FY 2010 University Center Economic Development..., preparing American regions for growth and success in the worldwide economy. Institutions of higher education... of higher education. For FY 2010, the University Center Economic Development Program competition is...

  15. Structures and Dynamics Division research and technology plans for FY 1894 and accomplishments for FY 1982

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1984-01-01

    The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.

  16. Space Transportation Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl

    2001-01-01

    This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.

  17. 77 FR 30516 - Tribally Controlled Postsecondary Career and Technical Institutions Program; Final Waivers and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ...For 60-month projects funded in fiscal year (FY) 2007 under the Tribally Controlled Postsecondary Career and Technical Institutions Program (TCPCTIP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current TCPCTIP grantees through FY 2013, or longer, if Congress continues to appropriate funds under the existing TCPCTIP program authority. This action will enable the two current TCPCTIP grantees to seek continuation awards in FY 2012 for their current projects, and we will not announce a new TCPCTIP competition in FY 2012.

  18. Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

    DTIC Science & Technology

    2017-03-21

    the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement

  19. Materials science on parabolic aircraft: The FY 1987-1989 KC-135 microgravity test program

    NASA Technical Reports Server (NTRS)

    Curreri, Peter A. (Editor)

    1993-01-01

    This document covers research results from the KC-135 Materials Science Program managed by MSFC for the period FY87 through FY89. It follows the previous NASA Technical Memorandum for FY84-86 published in August 1988. This volume contains over 30 reports grouped into eight subject areas covering acceleration levels, space flight hardware, transport and interfacial studies, thermodynamics, containerless processing, welding, melt/crucible interactions, and directional solidification. The KC-135 materials science experiments during FY87-89 accomplished direct science, preparation for space flight experiments, and justification for new experiments in orbit.

  20. The Navy’s Environmental Program and Opportunities in the Southwest

    DTIC Science & Technology

    2013-08-27

    Achieve RIP for all High Priority IRP Sites FY14 •Achieve RC for 90% of IRP + MRP Sites FY18 •Achieve RC for 95% of IRP + MRP Sites FY21 9 NAVFAC Southwest...8/21/2013 ER,N IRP vs. MRP ($M) NAVFAC SW 0 10 20 30 40 50 60 70 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 4 4 7 7 7 43 54 42 51...50 57 58 58 51 18 15 11 9 MRP IRP 10 NAVFAC Southwest Southwest ER,N Requirements Overall CTC: $766M ~54% IRP; ~46% MRP IRP , $411 MRP

  1. 75 FR 61167 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling... improve and standardize the quality of counseling provided by housing counselors employed by...

  2. 76 FR 375 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program... requirements for HUD's FY 2010 Rural Innovation Fund Program NOFA. Specifically, this NOFA announces the... Innovation grant funds, along with unobligated and unused funds remaining for the Rural Fund's predecessor...

  3. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  4. Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006

    DTIC Science & Technology

    2007-04-01

    Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of

  5. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  6. 76 FR 148 - Medicaid Program; Final FY 2009 and Preliminary FY 2011 Disproportionate Share Hospital...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... health DSH expenditures applicable to the State's FY 1995 DSH allotment by the total computable amount of...

  7. NREL Photovoltaic Program FY 1996 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less

  8. The National Research Initiative Competitive Grants Program in animal reproduction: changes in priorities and scope relevant to United States animal agriculture.

    PubMed

    Mirando, M A

    2007-03-01

    The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.

  9. Statewide Transportation Improvement Program - FY 1998-2000 - Proposed Highway & Transit Improvement Program - Draft

    DOT National Transportation Integrated Search

    1997-10-01

    The FY 1998-2000 Statewide Transportation Improvement Program (STIP) is a three-year program of highway and transit projects developed to fulfill the requirements set forth in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The ...

  10. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    DTIC Science & Technology

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  11. 75 FR 58423 - Notice of Funding Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program; Technical Correction AGENCY: Office of Healthy Homes and Lead Hazard...://www.Grants.gov its Notice of Funding Availability (NOFA) for HUD's FY2010 Lead-Based Paint Hazard...

  12. Federal Agency biodefense funding, FY2011-FY2012.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2011-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2011. This article updates those figures with budgeted amounts for FY2012, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2012 federal budget for civilian biodefense totals $6.42 billion. Of that total, $5.78 billion (90%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $637.6 million (10%) is budgeted for programs that have objectives solely related to biodefense.

  13. Federal agency biodefense funding, FY2013-FY2014.

    PubMed

    Sell, Tara Kirk; Watson, Matthew

    2013-09-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense.

  14. Federal agency biodefense funding, FY2010-FY2011.

    PubMed

    Franco, Crystal; Sell, Tara Kirk

    2010-06-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through FY2010. This article updates those figures with budgeted amounts for FY2011, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple public health, healthcare, national security, and international security issues in addition to biodefense. The FY2011 federal budget for civilian biodefense totals $6.48 billion. Of that total, $5.90 billion (91%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $577.9 million (9%) is budgeted for programs that deal strictly with biodefense.

  15. Federal Agency Biodefense Funding, FY2013-FY2014

    PubMed Central

    Watson, Matthew

    2013-01-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense. PMID:23906009

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  17. Implementation of genetic conservation practices in a muskellunge propagation and stocking program

    USGS Publications Warehouse

    Jennings, Martin J.; Sloss, Brian L.; Hatzenbeler, Gene R.; Kampa, Jeffrey M.; Simonson, Timothy D.; Avelallemant, Steven P.; Lindenberger, Gary A.; Underwood, Bruce D.

    2010-01-01

    Conservation of genetic resources is a challenging issue for agencies managing popular sport fishes. To address the ongoing potential for genetic risks, we developed a comprehensive set of recommendations to conserve genetic diversity of muskellunge (Esox masquinongy) in Wisconsin, and evaluated the extent to which the recommendations can be implemented. Although some details are specific to Wisconsin's muskellunge propagation program, many of the practical issues affecting implementation are applicable to other species and production systems. We developed guidelines to restrict future brood stock collection operations to lakes with natural reproduction and to develop a set of brood lakes to use on a rotational basis within regional stock boundaries, but implementation will require considering lakes with variable stocking histories. Maintaining an effective population size sufficient to minimize the risk of losing alleles requires limiting brood stock collection to large lakes. Recommendations to better approximate the temporal distribution of spawning in hatchery operations and randomize selection of brood fish are feasible. Guidelines to modify rearing and distribution procedures face some logistic constraints. An evaluation of genetic diversity of hatchery-produced fish during 2008 demonstrated variable success representing genetic variation of the source population. Continued evaluation of hatchery operations will optimize operational efficiency while moving toward genetic conservation goals.

  18. Tucannon River Spring Chinook Salmon Captive Broodstock Program, Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallinat, Michael; Varney, Michelle

    2003-05-01

    This report summarizes the objectives, tasks, and accomplishments of the Tucannon River Spring Chinook Captive Broodstock Program during 2002. The WDFW initiated a captive broodstock program in 1997. The overall goal of the Tucannon River captive broodstock program is for the short-term, and eventually long-term, rebuilding of the Tucannon River spring chinook salmon run, with the hope that natural production will sustain itself. The project goal is to rear captive salmon selected from the supplementation program to adults, spawn them, rear their progeny, and release approximately 150,000 smolts annually into the Tucannon River between 2003-2007. These smolt releases, in combinationmore » with the current hatchery supplementation program (132,000 smolts) and wild production, are expected to produce 600-700 returning adult spring chinook to the Tucannon River each year from 2005-2010. The captive broodstock program collected fish from five (1997-2001) brood years (BY). As of January 1, 2003, WDFW has approximately 11 BY 1998, 194 BY 1999, 314 BY 2000, 447 BY 2001, and 300 BY 2002 (for extra males) fish on hand at LFH. The 2002 eggtake from the 1997 brood year (Age 5) was 13,176 eggs from 10 ripe females. Egg survival was 22%. Mean fecundity based on the 5 fully spawned females was 1,803 eggs/female. The 2002 eggtake from the 1998 brood year (Age 4) was 143,709 eggs from 93 ripe females. Egg survival was 29%. Mean fecundity based on the 81 fully spawned females was 1,650 eggs/female. The 2002 eggtake from the 1999 brood year (Age 3) was 19,659 eggs from 18 ripe females. Egg survival was 55%. Mean fecundity based on the 18 fully spawned fish was 1,092 eggs/female. The total 2002 eggtake from the captive brood program was 176,544 eggs. A total of 120,833 dead eggs (68%) were removed with 55,711 live eggs remaining for the program. As of May 1, 2003 we had 46,417 BY 2002 captive brood progeny on hand A total of 20,592 excess BY 01 fish were marked as parr (AD/CWT) and released during May 2002 into the Tucannon River (rkm 40-45). This allowed us to stay within our maximum allowed number (150,000) of smolts released. On August 20, 97 (21 1998 BY and 76 1999 BY) adult captive broodstock were determined to be in excess of eggtake goals and were outplanted into the Tucannon River at Panjab Bridge (rkm 74.5). Released fish were tagged with Monel jaw tags and radio transmitters were inserted into ten females for tracking and monitoring. Due to the low frequency of natural spawning by released fish, high mortality due to predation and illegal harvest, and high egg mortality in the hatchery during 2002, priority will be to release excess progeny as parr to stay within smolt release goals rather than release excess captive broodstock as adults. During April 2003, WDFW volitionally released 140,396 BY 2001 captive broodstock progeny smolts from Curl Lake Acclimation Pond into the Tucannon River. These fish were marked with agency-only wire tags and no fin clips in order to differentiate them from the supplementation fish (CWT/Right Red VIE/No Finclip). A total of 1,007 captive brood progeny smolts were PIT tagged to compare their outmigration with smolts from the supplementation program (1,010 tagged). Monitoring their survival and future releases to adult returns, along with future natural production levels, will determine the success or failure of this captive broodstock program.« less

  19. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  20. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  1. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  2. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  3. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  4. 25 CFR 39.1003 - Allotment exception for FY 1991.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...

  5. FY11 Facility Assessment Study for Aeronautics Test Program

    NASA Technical Reports Server (NTRS)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  6. 2016 Targeted AirShed Grant Program - Closed Announcement FY 2016

    EPA Pesticide Factsheets

    Targeted Air Shed Grant Program proposal for FY 2016. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.

  7. 2015 Targeted AirShed Grant Program Grant - Closed Announcement FY 2015

    EPA Pesticide Factsheets

    Targeted Air Shed Grant Program proposal for FY 2015. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walters, T.; Savage, S.; Brown, J.

    At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.

  9. 76 FR 37174 - Capital Investment Program-New Starts and Small Starts Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Capital Investment Program--New Starts... apportionment of the FY 2011 Capital Investment (New Starts and Small Starts) program funds. The funds will be... FY 2011, $1,596,800,000 was appropriated for the Capital Investments Grant Account, which includes...

  10. FY 2016 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.

  11. FY 2017 Annual Performance Report (APR)

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.

  12. FY 2015 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.

  13. Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  14. DOE Solar Energy Technologies Program FY 2005 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sutula, Raymond A.

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.

  15. FY 2009-11 Operating Budget for Higher Education: Appropriations Committee Recommendations. Highlights

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2009

    2009-01-01

    This report explains that the General Fund budget: (1) calls for $1,565.4 million for the FY 2009-11 biennium, including $781.2 million in FY 2010 and $784.2 million in FY 2011; and (2) maintains the State's primary student financial aid programs at FY 2009 funding levels, with Connecticut Aid to Charter Oak funded at 80.0 percent of full funding…

  16. 77 FR 43301 - Medicaid Program; Disproportionate Share Hospital Allotments and Institutions for Mental Diseases...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... increase in the CPI-U for the prior FY (0.0 percent). Column F FY 2010 TC MAP Exp. Incl. DSH. This column... including DSH expenditures. Column G FY 2010 TC MAP Exp. Net of DSH. This column contains the amount of the States' actual FY 2010 total computable DSH expenditures. Column H FY 2010 TC MAP Exp. Net of DSH. This...

  17. 2009 DOE Vehicle Technologies Program Annual Merit Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2009-10-01

    Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.

  18. 76 FR 34683 - Withdrawal of Notices Inviting Applications for New Awards for Fiscal Year (FY) 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... (FY) 2011; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies (IRS) Program; et al. AGENCY: Office of Postsecondary Education, Department of...; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies...

  19. 75 FR 25913 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... Fiscal Year (FY) 2009 appropriations for the Paul S. Sarbanes Transit in Parks program (formally the... $464,027 will be added to available FY 2010 appropriations for the program. A total of 80 applicants... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...

  20. Technology transfer

    NASA Technical Reports Server (NTRS)

    Penaranda, Frank E.

    1992-01-01

    The topics are presented in viewgraph form and include the following: international comparison of R&D expenditures in 1989; NASA Technology Transfer Program; NASA Technology Utilization Program thrusts for FY 1992 and FY 1993; National Technology Transfer Network; and NTTC roles.

  1. Nevada Test Site-Directed Research and Development, FY 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less

  2. FY 2016 Grant Announcement: FY 2016 Technical Analysis and Programmatic Evaluation Support to the Chesapeake Bay Program Partnership

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation

  3. 75 FR 79419 - Training and Employment Guidance (TEGL) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ...) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting...-10 entitled, FY 2011 State Initial Allocations and the Process for Requesting Additional TAA Program... INFORMATION: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting Additional Trade...

  4. Federal Funding for Health Security in FY2016.

    PubMed

    Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew

    2015-01-01

    This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa.

  5. Federal Funding for Health Security in FY2016

    PubMed Central

    Sell, Tara Kirk; Watson, Matthew

    2015-01-01

    This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa. PMID:26042863

  6. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-08-02

    called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations

  7. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  8. FY 2017 Grant Announcement: FY 2017 Source Reduction Assistance Grant Program

    EPA Pesticide Factsheets

    The EPA Region 10 Pollution Prevention Program is announcing a grant competition for Source Reduction Assistance (SRA) awards. EPA Region 10 anticipates awarding approximately $95,000 in federal grant funding to support SRA agreements.

  9. 77 FR 40628 - HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5600-N-18-C-1] HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program, Cancellation AGENCY: Office... Availability (NOFA) ``Transformation Initiative: Natural Experiments Grant Program'' on Grants.gov . The close...

  10. FY 2018 Grant Announcement: FY2018 support for Small Water Grant (SWG) and Innovative and Nutrient Sediment Reduction (INSR) Grant

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a request for proposals (RFP) for supporting both the:1.Small Watershed Grants (SWG) program; and 2.Innovative Nutrient and Sediment Reduction (INSR) grants program.

  11. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  12. ORNLs Laboratory Directed Research and Development Program FY 2009 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2010-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2009. The associated FY 2009 ORNL LDRD Self-Assessment (ORNL/PPA-2010/2) provides financial data andmore » an internal evaluation of the program’s management process.« less

  13. ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  14. ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2009-03-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and anmore » internal evaluation of the program’s management process.« less

  15. ORNLs Laboratory Directed Research and Development Program FY 2012 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-03-01

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  16. Microgravity science and applications. Program tasks and bibliography for FY 1994

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground-based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. ATD (Advanced Technology Development) program task descriptions are also included. The bibliography cites the related PI (Principal Investigator) publications and presentations for these program tasks in FY 1994. Three appendices include Table of Acronyms, Guest Investigator Index, and Principal Investigator Index.

  17. Microgravity science & applications. Program tasks and bibliography for FY 1995

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. Advanced technology development (ATD) program task descriptions are also included. The bibliography cites the related principle investigator (PI) publications and presentations for these program tasks in FY 1994. Three appendices include a Table of Acronyms, a Guest Investigator index and a Principle Investigator index.

  18. 2008 Federal Energy Management Program (FEMP) Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  19. Five-Year Plan (FY04-FY-08) for the Manufacturing Technology (ManTech) Program. Supplement to the FY03 - FY07 Plan

    DTIC Science & Technology

    2003-07-01

    magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to

  20. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  1. 77 FR 64809 - Reallotment of FY 2011 Funds for the Low Income Home Energy Assistance Program (LIHEAP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Reallotment of FY... of Fiscal Year (FY) 2011 funds may be available for re-allotment. After a 30-day comment period, this amount has not changed. This notice announces that $3,089,920 was reallotted on September 26, 2012 to FY...

  2. Financial Summary Tables. Department of Defense Budget for Fiscal Year 1979

    DTIC Science & Technology

    1978-01-01

    79 Q FAD 740 - Object Classification Distribution of Direct and Reimbursable Obligations, FY 77, FY 78 and FY 79 .U 762 - FY 1979 Reimbursable Program...FAO-738/79 (FILE IN VOL. It JAN 23, 1978 PAGE 1 UOGET BALANCES REIMBURSABLE RECOVERIES TOTAL DIRECT OBLIGATIONS...m.---- .---- ...------.m.---- -..m.----.......---e e e ee-- - - - DIRECT OBLIGATIONS REIMBURSABLE TOTAL WRITEOFFS UNOBLIGATED UNOBLIGATED

  3. Military needs and forecast, 2

    NASA Technical Reports Server (NTRS)

    Goldstayn, Alan B.

    1986-01-01

    FORECAST 2 has accomplished its objectives of identifying high leverage technologies for corporate Air Force review. Implementation is underway with emphasis on restructuring existing programs and programming resources in the FY88 BES/FY89 POM. Many joint service/agency opportunities exist.

  4. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  5. 2012 Wind Program Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zayas, Jose; Higgins, Mark

    2012-06-01

    This report summarizes the proceedings of the 2012 Wind Program Peer Review, the goals of which were to review and evaluate the strategy and goals of the Wind Program; review and evaluate the progress and accomplishments of the program's projects funded in fiscal year (FY) 2010 and FY 2011; and foster interactions among the national laboratories, industry, and academic institutions conducting research and development on behalf of the program.

  6. DOE Solar Energy Technologies Program FY 2005 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program?s national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  7. 75 FR 37779 - Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.215L] Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice Inviting Applications for New Awards Using Fiscal Year (FY) 2009 Funds... applications for new awards using fiscal year (FY) 2009 funds for the Smaller Learning Communities Program...

  8. FY2015 Analysis of the Teamwork USA Program. Memorandum

    ERIC Educational Resources Information Center

    Howard, Mark

    2015-01-01

    The Department of Research and Evaluation (DRE) has completed an analysis of the performance of students who participated in the Teamwork USA Program, administered in FY2014 at three District schools. Teamwork USA hopes to improve student achievement at select Title I elementary schools via its Instrumental Music Program grant. This memorandum to…

  9. LDRD FY 2014 Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anita Gianotto; Dena Tomchak

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  10. State Training & Employment Program. Program Review for FY99-FY01.

    ERIC Educational Resources Information Center

    Cordova, Lorraine

    Alaska's State Training and Employment Program (STEP) was designed with the primary objective of reducing current and future claims against Unemployment Insurance (UI) benefits by providing training to those who are unemployed or facing unemployment. STEP is also charged with fostering growth of existing businesses and attracting new businesses to…

  11. Annual Defense Department Report FY 1973

    DTIC Science & Technology

    1972-02-22

    program of combatting Sickle- Cell Anemia. Finally, as we approach an all-volunteer force we will continually assess our recruiting and retention programs...GNP devoted to Defense continues to decline -- from 7.0% in FY 1972 to 6.4% in FY 1973. This is a 22 year low. 59 We also are requesting a suplemental ...complement Total Force Planning. Some of these initiatives will fall in areas where the U.S. bears the primary responsibility, while others stem from

  12. FY 1998 Proposed Rail Improvement Program Supplement Update - Bloomington II

    DOT National Transportation Integrated Search

    1997-07-01

    The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement : is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning track rehabilitation and new track co...

  13. FY 1998 Proposed Rail Improvement Program Supplement Update - Pontiac

    DOT National Transportation Integrated Search

    1997-07-01

    The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning new track construction at the Prairie C...

  14. FY 2018 Grant Announcement: FY2018 Support for Geospatial Analysis Support

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency’s (EPA) Chesapeake Bay Program Office (CBPO) is announcing a Request for Proposals (RFP) for applicants to provide the Chesapeake Bay Program (CBP) partners with a proposal for providing geospatial analysis support

  15. A meta-analysis of lesser prairie-chicken nesting and brood-rearing habitats: implications for habitat management

    USGS Publications Warehouse

    Hagen, Christian A.; Grisham, Blake A.; Boal, Clint W.; Haukos, David A.

    2013-01-01

    The distribution and range of lesser prairie-chicken (Tympanuchus pallidicinctus) has been reduced by >90% since European settlement of the Great Plains of North America. Currently, lesser prairie-chickens occupy 3 general vegetation communities: sand sagebrush (Artemisia filifolia), sand shinnery oak (Quercus havardii), and mixed-grass prairies juxtaposed with Conservation Reserve Program grasslands. As a candidate for protection under the Endangered Species Act, there is a need for a synthesis that characterizes habitat structure rangewide. Thus, we conducted a meta-analysis of vegetation characteristics at nest sites and brood habitats to determine whether there was an overall effect (Hedges' d) of habitat selection and to estimate average (95% CI) habitat characteristics at use sites. We estimated effect sizes (di) from the difference between use (nests and brood sites) and random sampling sites for each study (n = 14), and derived an overall effect size (d++). There was a general effect for habitat selection as evidenced by low levels of variation in effect sizes across studies and regions. There was a small to medium effect (d++) = 0.20-0.82) of selection for greater vertical structure (visual obstruction) by nesting females in both vegetation communities, and selection against bare ground (d++ = 0.20-0.58). Females with broods exhibited less selectivity for habitat components except for vertical structure. The variation of d++ was greater during nesting than brooding periods, signifying a seasonal shift in habitat use, and perhaps a greater range of tolerance for brood-rearing habitat. The overall estimates of vegetation cover were consistent with those provided in management guidelines for the species.

  16. Evaluation of drone brood removal for management of Varroa destructor (Acari: Varroidae) in colonies of Apis mellifera (Hymenoptera: Apidae) in the northeastern United States.

    PubMed

    Calderone, N W

    2005-06-01

    The efficacy of drone brood removal for the management of Varroa destructor Anderson & Trueman in colonies of the honey bee, A. mellifera L., was evaluated. Colonies were treated with CheckMite+ in the fall of 2002. The following spring, quantities of bees and brood were equalized, but colonies were not retreated. The brood nest of each colony consisted of 18 full-depth worker combs and two full-depth drone combs. Each worker comb had <12.9 cm2 of drone cells. Standard management practices were used throughout the season. Colonies were randomly assigned to one of two groups. In the control group, drone combs remained in place throughout the season. In the treatment group, drone combs were removed on 16 June, 16 July, 16 August, and 16 September and replaced with empty drone combs (16 June) or with drone combs removed on the previous replacement date. In the early fall, the average mite-to-bee ratio in the control group was significantly greater than the corresponding ratio in the treatment group. Drone brood removal did not adversely affect colony health as measured by the size of the worker population or by honey production. Fall worker populations were similar in the two groups. Honey production in treatment colonies was greater than or similar to production in control colonies. These data demonstrate that drone brood removal can serve as a valuable component in an integrated pest management program for V. destructor and may reduce the need for other treatments on a colony-by-colony basis.

  17. FY2013 Defense Budget Request: Overview and Context

    DTIC Science & Technology

    2012-04-20

    Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes

  18. NASA's Microgravity Research Program

    NASA Technical Reports Server (NTRS)

    Woodard, Dan

    1998-01-01

    This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.

  19. U.S. Department of Transportation : FY 1998 budget in brief

    DOT National Transportation Integrated Search

    1998-01-01

    The fiscal year (FY) 1998 budget request for DOT makes a down payment on meeting the : transportation challenges of the 21st century. A total of $38.4 billion is proposed to support : transportation programs in FY 1998. This is approximately one perc...

  20. Medicare program; FY 2014 hospice wage index and payment rate update; hospice quality reporting requirements; and updates on payment reform. final rule.

    PubMed

    2013-08-07

    This final rule updates the hospice payment rates and the wage index for fiscal year (FY) 2014, and continues the phase out of the wage index budget neutrality adjustment factor (BNAF). Including the FY 2014 15 percent BNAF reduction, the total 5 year cumulative BNAF reduction in FY 2014 will be 70 percent. The BNAF phase-out will continue with successive 15 percent reductions in FY 2015 and FY 2016. This final rule also clarifies how hospices are to report diagnoses on hospice claims, and provides updates to the public on hospice payment reform. Additionally, this final rule changes the requirements for the hospice quality reporting program by discontinuing currently reported measures and implementing a Hospice Item Set with seven National Quality Forum (NFQ) endorsed measures beginning July 1, 2014, as proposed. Finally, this final rule will implement the hospice Experience of Care Survey on January 1, 2015, as proposed.

  1. Scout launch vehicle, phases 4 and 5

    NASA Technical Reports Server (NTRS)

    Mccracken, D. C.; Leiss, A.; Horrocks, E. R.; Turpen, N. H.

    1974-01-01

    The historical data of the Scout launch vehicle program for Phases IV and V (vehicles 138 through 177) is presented for the FY 1966 through FY 1971 time period. Technical data and accounting information are detailed to provide a total picture of the program.

  2. ARIES Oxide Production Program Annual Report - FY14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, Evelyn A.; Dinehart, Steven Mark

    A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.

  3. Notification: Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program

    EPA Pesticide Factsheets

    Project #OPE-FY12-0017, September 17, 2012. We have completed the preliminary research portion ofour evaluation, Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program (OPE FY12-0017) and will now continue into the fieldwork phase.

  4. FY2017 Defense Appropriations Fact Sheet: Selected Highlights of H.R. 5293 and S. 3000

    DTIC Science & Technology

    2016-06-17

    legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74, the Bipartisan...funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is also exempt from that spending cap because it is classified as funding for so-called...Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations for FY2016 and

  5. 77 FR 68567 - Announcement of Funding Awards for the Continuum of Care Program for Fiscal Year (FY) 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ...In accordance with section 102(a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of past funding decisions made by the Department in a competition for funding under the FY2011 Notice of Funding Availability (NOFAs) for the Homeless Assistance Grants program. This announcement contains the names of the awardees and the amounts of the awards made available by HUD in FY2011.

  6. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2007-06-12

    up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The

  7. Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-25

    production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and

  8. Program Direction FY 2017 Budget At-A-Glance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-03-01

    Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.

  9. EVALUATION TECHNIQUES AND TOOL DEVELOPMENT FOR FY 08 CMAQ RELEASE

    EPA Science Inventory

    In this task, research efforts are outlined that relate to the AMD Model Evaluation Program element and support CMAQ releases within the FY05-FY08 time period. Model evaluation serves dual purposes; evaluation is necessary to characterize the accuracy of model predictions, and e...

  10. Medicare Program; Explanation of FY 2004 Outlier Fixed-Loss Threshold as Required by Court Rulings. Clarification.

    PubMed

    2016-01-22

    In accordance with court rulings in cases that challenge the federal fiscal year (FY) 2004 outlier fixed-loss threshold rulemaking, this document provides further explanation of certain methodological choices made in the FY 2004 fixed-loss threshold determination.

  11. GLOBAL CHANGE RESEARCH NEWS #37: PUBLICATION OF "OUR CHANGING PLANET: THE FY 2002 U.S. GLOBAL CHANGE RESEARCH PROGRAM"

    EPA Science Inventory

    The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY 2002 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the Committee on Environment and Natural Reso...

  12. 78 FR 8552 - Announcement of Funding Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Program. This announcement contains the consolidated names and addresses of the award recipients under... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...

  13. Costs and Benefits to Pregnant Male Pipefish Caring for Broods of Different Sizes

    PubMed Central

    Sagebakken, Gry; Ahnesjö, Ingrid; Kvarnemo, Charlotta

    2016-01-01

    Trade-offs between brood size and offspring size, offspring survival, parental condition or parental survival are classic assumptions in life history biology. A reduction in brood size may lessen these costs of care, but offspring mortality can also result in an energetic gain, if parents are able to utilize the nutrients from the demised young. Males of the broad-nosed pipefish (Syngnathus typhle) care for the offspring by brooding embryos in a brood pouch. Brooding males can absorb nutrients that emanate from embryos, and there is often a reduction in offspring number over the brooding period. In this study, using two experimentally determined brood sizes (partially and fully filled brood pouches), we found that full broods resulted in larger number of developing offspring, despite significantly higher absolute and relative embryo mortality, compared to partial broods. Male survival was also affected by brood size, with males caring for full broods having poorer survival, an effect that together with the reduced embryo survival was found to negate the benefit of large broods. We found that embryo mortality was lower when the brooding males were in good initial condition, that embryos in broods with low embryo mortality weighed more, and surprisingly, that males in higher initial condition had embryos of lower weight. Brood size, however, did not affect embryo weight. Male final condition, but not initial condition, correlated with higher male survival. Taken together, our results show costs and benefits of caring for large brood sizes, where the numerical benefits come with costs in terms of both embryo survival and survival of the brooding father, effects that are often mediated via male condition. PMID:27243937

  14. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  15. San Diego transit five year plan update : FY 1982-1986

    DOT National Transportation Integrated Search

    1981-07-01

    The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...

  16. INDOT Research Program Benefit Cost Analysis—Return on Investment for Projects Completed in FY 2016

    DOT National Transportation Integrated Search

    2017-12-01

    The Governors Office requested an annual financial analysis of the INDOT Research Program to determine the return on the research investment (ROI). The current financial analysis is for research projects that completed in FY 2016. Analyses on prev...

  17. MCSC Office of Small Business Programs (OSBP) Presentation to the Attendees of the Navy Gold Coast MCSC Workshop

    DTIC Science & Technology

    2014-08-13

    Small Business Category FY 2012 Navy Target Percentage FY 2013 Navy Target Percentage Small Business 15.75% 18.00% SDB 5.00% 5.50...9 FY 2013 Achievement Small Business Category FY 13 Target FY 13 Achievement % Difference Small Business 18.00% 29.93% +11.93% SDB 5.50...709,508,809 18.00% 29.93% SDB 704 $351,083,260 5.50% 14.81% VOSB * 462 $130,028,497 0.00% 5.49% SDVOSB 267 $87,214,636 2.00% 3.68% WOSB 327

  18. Development Achievements for Fiscal 1990.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…

  19. Tri-Lab Co-Design Milestone: In-Depth Performance Portability Analysis of Improved Integrated Codes on Advanced Architecture.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoekstra, Robert J.; Hammond, Simon David; Richards, David

    2017-09-01

    This milestone is a tri-lab deliverable supporting ongoing Co-Design efforts impacting applications in the Integrated Codes (IC) program element Advanced Technology Development and Mitigation (ATDM) program element. In FY14, the trilabs looked at porting proxy application to technologies of interest for ATS procurements. In FY15, a milestone was completed evaluating proxy applications in multiple programming models and in FY16, a milestone was completed focusing on the migration of lessons learned back into production code development. This year, the co-design milestone focuses on extracting the knowledge gained and/or code revisions back into production applications.

  20. Cooperation, conflict, and crèching behavior in goldeneye ducks.

    PubMed

    Eadie, J M; Lyon, B E

    1998-05-01

    Crèching behavior, or brood amalgamation, results in offspring being reared by adults other than their genetic parents. Although a variety of hypotheses have been proposed to explain this behavior, most assume either that brood amalgamation is accidental (i.e., nonselected) or that adoption of young is selected for because of social benefits to the young and/or adopting parents. We propose, instead, that brood amalgamation is a function of two separate processes: brood desertion and brood adoption. To examine brood desertion, we develop a graphic model to predict when parents should abandon their young and we test this model experimentally for the Barrow's goldeneye (Bucephala islandica). As predicted, females deserted their offspring when the size of the brood was experimentally reduced. Brood adoption occurred when deserted ducklings joined other broods. However, the success of ducklings in doing so was strongly dependent on the availability of potential host broods and on the age of the recipient broods. Foreign ducklings were readily accepted into young broods (<10 d old) but invariably were rejected from old broods. We could detect no benefits or costs of brood adoption to the host females, contrary to the expectations of a social benefit hypothesis. Our experiments indicate that Crèching behavior is driven by selection on adults to abandon their brood when the benefits of continued investment are outweighed by the reduction in future reproduction and selection on deserted ducklings to join other broods to obtain parental care. Rather than a form of cooperative brood care, Crèching in goldeneyes is perhaps best considered as a form of reproductive parasitism, entailing parent-offspring conflict over brood desertion and intergenerational conflict over adoption of abandoned young.

  1. Medicare Program; FY 2018 Hospice Wage Index and Payment Rate Update and Hospice Quality Reporting Requirements. Final rule.

    PubMed

    2017-08-04

    This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2018. Additionally, this rule includes new quality measures and provides an update on the hospice quality reporting program.

  2. Use and selection of brood-rearing habitat by Sage Grouse in south central Washington

    USGS Publications Warehouse

    Sveum, C.M.; Crawford, J.A.; Edge, W.D.

    1998-01-01

    Sage Grouse (Centrocercus urophasianus) brood-habitat use was examined during 1992 and 1993 at the Yakima Training Center in Yakima and Kittitas counties, Washington. During the 2 yr we followed 38 broods, of which 12 persisted to 1 August (x?? = approximately 1.5 chicks/brood). Food forb cover was greater at all brood locations than at random locations. Hens with broods in big sagebrush/bunchgrass habitat (Artemisia tridentata/Agropyron spicatum) selected for greater food forb cover, total forb cover, and lower shrub heights; broods in altered big sagebrush/bunchgrass habitats selected greater tall grass cover and vertical cover height; broods in grassland showed no preference for any measured vegetation characteristics. During the early rearing period (post-hatching-6 wk) each year, broods selected sagebrush/bunchgrass. Broods in 1993 made greater use of grasslands than in 1992 and selected grassland during the late brood-rearing period (7-12 wk). Broods selected for sagebrush/bunchgrass during midday, but 52% of brood locations in the afternoon were in grassland. Tall grass cover was greater at morning (0500-1000 h) and afternoon (1501-2000 h) brood locations than at midday (1001-1500 h) and random locations. Midday brood locations had greater shrub cover and height than morning and afternoon locations. Selection of habitat components was similar to the results of other studies, but habitat conditions coupled with a possible lack of 'alternate brood-rearing cover types resulted in low survival of chicks.

  3. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  4. Logistics Modernization Program System Procure-to-Pay Process Did Not Correct Material Weaknesses

    DTIC Science & Technology

    2012-05-29

    Prevalidation of DOD Commercial Payments,” March 2, 2007 Army U.S. Army Audit Agency Report No. A-2007-0205- FFM , “Logistics Modernization Program...Report No. A-2007-0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 U.S. Army Audit Agency Report No

  5. Military Construction and Family Housing Program. Fiscal Year (FY) 2001 Budget Estimates

    DTIC Science & Technology

    2000-02-01

    Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data...Department of the Air Force Military Construction and Military Family Housing Program Summary Fiscal Year 2001 Appropriation Authorization Request... FISCAL YEAR 2001 (DOLLARS IN THOUSANDS) STATE/COUNTRY INSTALLATION TITLE APPROP REQUEST AUTH REQUEST PAGE INSIDE THE U.S. ALABAMA

  6. Directed Research Program in Reading, Early Childhood, Vocational Education, School Organization and Administration, FY 72 - FY 76.

    ERIC Educational Resources Information Center

    National Center for Educational Research and Development (DHEW/OE), Washington, DC.

    In 1970 the National Center for Educational Research and Development (CER) reviewed United States Office of Education (USOE) Bureau of Research policies over the previous 15 years, and as a result of this review, initiated the Directed Research Program. This program will concentrate funds in four areas of high educational significance and will be…

  7. Evaluating the Productivity of VA, NIH, and AHRQ Health Services Research Career Development Awardees.

    PubMed

    Finney, John W; Amundson, Erin O; Bi, Xiaoyu; Cucciare, Michael A; Eisen, Seth A; Finlay, Andrea K; Halvorson, Max A; Hayashi, Ko; Owens, Douglas K; Maisel, Natalya C; Timko, Christine; Weitlauf, Julie C; Cronkite, Ruth C

    2016-04-01

    To evaluate the academic advancement and productivity of Department of Veterans Affairs Health Services Research and Development (HSR&D) Career Development Award (CDA) program recipients, National Institutes of Health (NIH) K awardees in health services research (HSR), and Agency for Healthcare Research and Quality (AHRQ) K awardees. In all, 219 HSR&D CDA recipients from fiscal year (FY) 1991 through FY2010; 154 NIH K01, K08, and K23 awardees FY1991-FY2010; and 69 AHRQ K01 and K08 awardees FY2000-FY2010 were included. Most data were obtained from curricula vitae. Academic advancement, publications, grants, recognition, and mentoring were compared after adjusting for years since award, and personal characteristics, training, and productivity prior to the award. No significant differences emerged in covariate-adjusted tenure-track academic rank, number of grants as primary investigator (PI), major journal articles as first/sole author, Hirsch h-index scores, likelihood of a journal editorship position or membership in a major granting review panel, or mentoring postgraduate researchers between the HSR&D CDA and NIH K awardees from FY1991-FY2010, or among the three groups of awardees from FY2000 or later. Among those who reported grant funding levels, HSR&D CDAs from FY1991-2010 had been PI on more grants of $100,000 than NIH K awardees. HSR&D CDAs had a higher mean number of major journal articles than NIH K awardees from FY1991-2010. Findings show that all three HSR career development programs are successfully selecting and mentoring awardees, ensuring additional HSR capacity to improve the quality and delivery of high-value care.

  8. Brood size can influence maternal behaviour and chick's development in precocial birds.

    PubMed

    Aigueperse, Nadège; Pittet, Florent; de Margerie, Emmanuel; Nicolle, Céline; Houdelier, Cécilia; Lumineau, Sophie

    2017-05-01

    Mothers have a crucial influence on offspring development. Variations of maternal behaviour can be due to numerous parameters, for instance costs are related to the size of a brood/litter, which in turn can influence the level of mothers' investment in each offspring. Here we investigated the influence of brood size on the behaviour of Japanese quail mothers and chicks during the mothering period and on offspring development. We compared two types of broods: small broods of three chicks (N=9) and large broods of six chicks (N=9). Behavioural tests assessed chicks' social and emotional traits. Mothers of large broods emitted more maternal vocalisations at the beginning of the mothering period, but at the end they assumed more non-covering postures and trampled chicks more than mothers of small broods. Chicks in large broods huddled up more whereas chicks in small broods rested alone more frequently. Moreover, the social motivation of chicks in large broods was higher than that of chicks in small broods, although their emotional reactivity levels were similar. Our results evidence the importance of brood size for maintaining family cohesion and the influence of brood size on chicks' interactions with their siblings. We evaluated the influence of mothers and siblings on chicks' behavioural development. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. 78 FR 28895 - Susan Harwood Training Grant Program, FY 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Program, FY 2013 AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Notice of... Thursday, June 13, 2013, the application deadline date. ADDRESSES: The complete Susan Harwood Training... Order No. 1-2012 (77 FR 3912). Signed at Washington, DC, on May 13, 2013. David Michaels, Assistant...

  10. 75 FR 30908 - Notice of Funds Availability for FY 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... for the FY 2010 funding round of the Financial Education and Counseling (FEC) Pilot Program... Counseling Services to Prospective Homebuyers. The goals of grants that are awarded through the FEC Pilot Program are to identify successful methods of Financial Education and Counseling Services that result in...

  11. 75 FR 75666 - Advanced Placement (AP) Test Fee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...

  12. Fiscal Year 2007 Program Performance Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…

  13. 76 FR 5244 - Alternative Transportation in Parks and Public Lands Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Fiscal Year (FY) 2010 appropriations and previously unallocated prior year funds, for the Paul S... reserved for oversight activities, and $46,591 will be added to available FY 2011 appropriations for the... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...

  14. The congestion mitigation and air quality improvement (CMAQ) program : a summary of fifth year activities (FY 1996 : October 1995-September 1996)

    DOT National Transportation Integrated Search

    1998-02-01

    This report is the fifth annual national review of activities funded under the : Congestion Mitigation and Air Quality Improvement (CMAQ) Program, covering : fiscal year (FY) 1996. It covers the distribution of funding among project : categories, an ...

  15. 77 FR 24188 - Application Deadline for Fiscal Year (FY) 2012; Small, Rural School Achievement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... DEPARTMENT OF EDUCATION Application Deadline for Fiscal Year (FY) 2012; Small, Rural School... for submission of fiscal year (FY) 2012 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES: Application...

  16. 75 FR 45149 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ...: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing Counseling Grant Program AGENCY... requirements for the FY2010 Housing Counseling Grant NOFA. Approximately $79 million is made available through...), to support the delivery of a wide variety of housing counseling services to homebuyers, homeowners...

  17. 75 FR 61168 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Asthma Interventions in Public and..., funding criteria, and other requirements for the FY2010 Asthma Interventions in Public and Assisted... (CFDA) number for Asthma Interventions in Public and Assisted Multifamily Housing Grant Program is 14...

  18. 76 FR 29258 - Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Interventions in Public and Assisted Multifamily Housing Program AGENCY: Office of Healthy Homes and Lead Hazard... Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted... Availability (NOFA) for the Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted Multifamily...

  19. Report of the Secretary of Defense Frank C. Carlucci to the Congress on the FY 1990/FY 1991 Biennial Budget and FY 1990-94 Defense Programs

    DTIC Science & Technology

    1990-01-01

    effective ways of promoting U.S. interests. Finally, our Denton Amendment space-available transportation program continues assisting generous American hu... Eglin AFB, FL 9th SOS, Eglin AFB, FL 55th SOS, Eglin AFB, FL 1724th Special Tactics Squadron, Pope AFB, NC 67th SOS, RAF Woodbridge, UK 21st SOS...almost all of which were built from 1962 to 1966 - faced block obsolescence within a decade, and their missiles would not be effective against hardened

  20. Descriptive Summaries of the Research Development Test & Evaluation Army Appropriation FY 1982. Supporting Data FY 1982, Budget Estimate Submitted to Congress January 1981 (Amended 30 April 1981). Volume II.

    DTIC Science & Technology

    1981-01-01

    the Position Location Reporting System/Joint Tactical Information Distributlo:; System Hybrid (ADDS) was approved by the Combat and Materiel Developers...Programs program. The establishment of a hybrid testbed will be Initiated in FY 1981 integrating the engint-ciag development models of Position...ad anticipated. 0.110 - This project was Increased by $1999 thousand in FT 1980 to support additional AD work on the hybrid collective protec- tion

  1. Report of the Secretary of Defense Caspar W. Weinberger to the Congress on the FY 1988/FY 1989 Budget and FY 1988-92 Defense Programs, January 12, 1987.

    DTIC Science & Technology

    1987-01-01

    enough to sustain one wartime station overseas as well as satisfy training and maintenance needs. Advanced TacticalAir Reconnaissance System ( ATARS ...The ATARS is an umbrella concept for a series of upgrades in tactical reconnaissance capabilities. Major elements of the program include the Tactical...Funding Funding Funding E-3A Modifkation Development: $ Millions 105.2 96.8 110.7 88.4 Procurement: Quantity - - - - $ Millions .9 33.5 27.7 40.7 ATARS

  2. NASA Microgravity Science and Applications Program

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.

  3. The Defense Airborne Reconnaissance Office Unmanned Aerial Vehicle (UAV) Annual Report FY 1996.

    DTIC Science & Technology

    1996-11-06

    i>’ ’" UAV Annual Report FY1996 6 November 1996 L DEFENSE MRBOBNEiSCONNAGSAHCEC UAVANNUAL REPORT OUR SECOND UNMANNED AERIAL VEHICLE (UAV...ANNUAL REPORT provides an overview of the Defense Department’s UAV program activities for fiscal year (FY) 1996 . The Defense Airborne Reconnaissance...significant accomplishments that UAVs have achieved this past year, FY 1996 . Simply stated, UAVs are moving from words to deeds. They are being recognized in

  4. Tactical Aircraft Modernization: Issues for Congress

    DTIC Science & Technology

    2007-06-08

    Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform

  5. Factors limiting mallard brood survival in prairie pothole landscapes

    USGS Publications Warehouse

    Krapu, Gary L.; Pietz, Pamela J.; Brandt, David A.; Cox, Robert R.

    2000-01-01

    In order to estimate mallard (Anas platyrhynchos) production from managed and unmanaged lands, waterfowl biologists need measurable predictors of brood survival. We evaluated effects of percent of seasonal basins holding water (WETSEAS), percent of upland landscape in perennial cover (PERNCOVER), rainfall (RAIN), daily minimum ambient temperature (TMIN), hatch date (HATCHDATE), brood age (BA; 0-7 or 8-30 days), age of brood females, and brood size on mallard brood survival in prairie pothole landscapes, and developed a predictive model using factors found to have significant effects. Sixteen of 56 radiomarked broods experienced total loss during 1,250 exposure days. Our final fitted model of brood survival contained only main effects of WETSEAS, HATCHDATE, and RAIN. Total brood loss during the first 30 days of exposure was 11.2 times more likely for broods hatched on areas with 59% WETSEAS. Total brood loss was 5.2 times more likely during rainy conditions than during dry periods, and the hazard of total brood loss increased by 5% for each 1-day delay in hatching between 17 May and 12 August. High survival of mallard broods in landscapes where most seasonal basins contain water underscores the importance of maintaining seasonal wetlands as a major component of wetland complexes managed for mallard production. Because early hatched broods have higher survival, we also suggest that waterfowl managers focus their efforts on enhancing nest success of early laid clutches, especially in wet years.

  6. Computer Science Research Funding: How Much Is Too Little?

    DTIC Science & Technology

    2009-06-01

    Bioinformatics Parallel computing Computational biology Principles of programming Computational neuroscience Real-time and embedded systems Scientific...National Security Agency ( NSA ) • Missile Defense Agency (MDA) and others The various research programs have been coordinated through the DDR&E...DOD funding included only DARPA and OSD programs. FY07 and FY08 PBR funding included DARPA, NSA , some of the Services’ basic and applied research

  7. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  8. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less

  9. Proposed U.S. Space Weather Budget for Fiscal Year 2011 Would Fund Key Programs

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-09-01

    The proposed U.S. federal budget for space weather research for fiscal year (FY) 2011 would provide funding for key space weather programs within several U.S. agencies, including NASA, NOAA, the National Science Foundation (NSF), and the Air Force. Funding for the programs comes ahead of the upcoming solar maximum, a period of the solar cycle with heightened solar activity, projected for 2013. Several officials indicated that while funding is not tied to a particular solar maximum or minimum, available assets could help with studying and preparing for the solar maximum. The proposed FY 2011 budget for the Heliophysics Division within NASA's Science Mission Directorate is $641.9 million, compared with the FY 2010 enacted budget of $627.4 million. Within the proposed budget is $166.9 million for heliophysics research, down slightly from $173 million for FY 2010. The proposed budget would include $31.7 million for heliophysics research and analysis (compared with $31 million for FY 2010); $66.7 million for “other missions and data analysis,” including Cluster II, the Advanced Composition Explorer (ACE), and the Time History of Events and Macroscale Interactions during Substorms (THEMIS) mission; and $48.9 million for sounding rockets.

  10. Military Retirement: Background and Recent Developments

    DTIC Science & Technology

    2016-04-06

    facilities and programs. Currently, active component personnel are eligible for retirement or “vested” after completing 20 years of service ( YOS ) and have...Defined Benefit Calculations ............................... 4 “High Three” Eligibility and Defined Benefit Calculations...Retirement Eligibility Flowchart ................... 4 Tables Table 1. DOD Retired Military Personnel, Survivors, and Program Costs, FY2005- FY2014

  11. The NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond and Recent Radiation Highlights

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2015-01-01

    This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.

  12. Library of Michigan FY 2000 LSTA Subgrant Program Guidelines.

    ERIC Educational Resources Information Center

    Michigan Library, Lansing.

    This handbook provides FY (fiscal year) 2000 guidelines developed by the Library of Michigan for applying for LSTA (Library Services and Technology Act) subgrant funding. The handbook includes the following sections: (1) overview of the LSTA subgrant program; (2) general application guidelines for all funding areas; (3) required elements of the…

  13. GLOBAL CHANGE RESEARCH NEWS #8: OUR CHANGING PLANET: THE FY2000 U.S. GLOBAL CHANGE RESEARCH PROGRAM

    EPA Science Inventory

    This edition of Global Change Research News focuses on the publication of the new OurChanging Planet: The FY2000 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices ofthe President's National Science and Technology Council. It...

  14. GLOBAL CHANGE RESEARCH NEWS #24: PUBLICATION OF FY2001 EDITION OF "OUR CHANGING PLANET"

    EPA Science Inventory

    The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY2001 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the President's National Science and Technolog...

  15. Institutional research and development, FY 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Struble, G.L.; Lawler, G.M.; Crawford, R.B.

    The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87. (DWL)

  16. 75 FR 56507 - Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... Assistant Administrator for Management and CFO/CAO, Ocean Services and Coastal Zone Management. [FR Doc...-01] RIN 0648-ZC21 Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation....gov . SUPPLEMENTARY INFORMATION: The Coastal and Estuarine Land Conservation Program was established...

  17. OPERATIONS AND RESEARCH AT THE U.S. EPA INCINERATION RESEARCH FACILITY: ANNUAL REPORT FOR FY94

    EPA Science Inventory

    Fiscal year 1994 (FY94, October 1, 1993 through September 30,1994) saw the continuation of incineration research testing efforts at the IRF. uring the year, two major pilot-scale programs were completed and a third carried to near-completion, and two bench-scale test programs of ...

  18. LDRD 2017 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Jack; Flynn, Liz

    This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2017, as required. In FY 2017, the BNL LDRD Program funded 46 projects, 13 of which were new starts, at a total cost of $10.4M.

  19. Air Quality Conformity Determination Of the Constrained Long Range Plan And The FY99-2004 Transportation Improvement Program For The Washington Metropolitan Region

    DOT National Transportation Integrated Search

    1998-07-15

    This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...

  20. 76 FR 28803 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program and Amendment and Technical Corrections AGENCY: Office of Healthy Homes and Lead Hazard Control, HUD. ACTION: Notice of Availability and...

  1. 75 FR 21232 - FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...-0182-02] FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due Date for Proposals AGENCY: National Institute of Standards and Technology (NIST), United States Department of Commerce. ACTION: Notice. SUMMARY: NIST publishes this notice to extend the deadline for...

  2. Brood size and its importance for nestling growth in the Biscutate Swift (Streptoprocne biscutata, Aves: Apodidae).

    PubMed

    Pichorim, M; Monteiro-Filho, E L A

    2008-11-01

    Many Apodidae, including Streptoprocne biscutata (Sclater, 1866), drop eggs from their nests during incubation. This is interpreted as nest site competition or accident. We provide evidence that egg ejection is deliberate and that this behaviour controls the brood size. Brood sizes were manipulated and nestling growth was measured to test the hypothesis that pairs can regulate brood size during incubation based on current ability to rear nestlings. Natural (control) broods with one, two and three nestlings, and manipulated (experimental) broods reduced to one and increased to two and three young were monitored. Growth rates were measured based on weight, and wing, tail and tarsus lengths of natural and manipulated broods. We compared the slopes of each measure's regression lines of the nestlings of each brood size by t-test. Nestling growth of control nests was similar and relatively little associated with brood size. In broods reduced to one nestling, weight, wing and tail had greater growth rates, and in broods increased to three nestlings growth rates were lower. Weight was most, and tarsus length least influenced by brood size. In general, nestling growth of manipulated nests was inversely proportional to brood size. The results suggest that pairs with larger clutches are in better physical conditions than others. Thus, in experimental broods, pairs are over or under-loaded because feeding activities increase or decrease and these changes affect the growth rate of the nestlings. The present study suggests that egg ejection can control brood size. This behaviour is probably stimulated by physical changes in the adult birds during incubation.

  3. 78 FR 17188 - Application Deadline for Fiscal Year (FY) 2013; Small, Rural School Achievement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... DEPARTMENT OF EDUCATION [CFDA: Number 84.358A] Application Deadline for Fiscal Year (FY) 2013... establish the deadline for submission of fiscal year (FY) 2013 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES...

  4. Library of Michigan FY 2002 Library Services and Technology Act (LSTA) Grant Administration Handbook.

    ERIC Educational Resources Information Center

    Michigan Library, Lansing.

    This handbook provides FY (fiscal year) 2002 guidelines developed by the Library of Michigan for administering LSTA (Library Services and Technology Act) grants. The first section provides an overview of the LSTA program. The second section gives the grant timeline for FY 2002. The third section describes the award process, including award…

  5. Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-01-05

    and is adding 20 berths to all seaframes. The increased berthing supports small increases in the size of the core crew, mission package detachments...for both the FY2009 ships and the FY2010 ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the

  6. 76 FR 2407 - Notice of Availability: HUD's Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ...'s Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and Community Facilities Program--Technical Correction and Extension of Deadline Date AGENCY: Office of the Chief Human Capital Officer, HUD... Availability (NOFA) for the Fiscal Year (FY) 2010 Capital Fund Education and Community Facilities (CFCF...

  7. 76 FR 4645 - Fusion Energy Sciences Advisory Committee; Notice of Open Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ..., 9 a.m. to 5 p.m.; Tuesday, March 8, 2011, 8:30 a.m. to 12 p.m. ADDRESSES: Doubletree Bethesda Hotel... year (FY) 2012 budget submission to Congress and to conduct other committee business. Tentative Agenda Items: Office of Science FY 2012 Congressional Budget Request FES Program FY 2012 Congressional Budget...

  8. Brood rearing ecology of king eiders on the north slope of Alaska

    USGS Publications Warehouse

    Phillips, Laura M.; Powell, Abby N.

    2009-01-01

    We examined King Eider (Somateria spectabilis) brood survival in the Kuparak oil field in northern Alaska in 2002 and 2003 by monitoring hens with broods using radiotelemetry. We observed complete brood loss in eight of 10 broods. Broods survived less than 2 weeks on average, and most mortality occurred within 10 days of hatch. Distance hens traveled overland did not affect brood survival. Apparent King Eider brood survival in our study area was lower than reported for eider species in other areas. We recommend future studies examine if higher densities of predators in oil fields reduces King Eider duckling survival.

  9. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-05-31

    building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships

  10. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  11. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  12. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  13. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  14. Non-invasive current and voltage imaging techniques for integrated circuits using scanning probe microscopy. Final report, LDRD Project FY93 and FY94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, A.N.; Cole, E.I. Jr.; Tangyunyong, Paiboon

    This report describes the first practical, non-invasive technique for detecting and imaging currents internal to operating integrated circuits (ICs). This technique is based on magnetic force microscopy and was developed under Sandia National Laboratories` LDRD (Laboratory Directed Research and Development) program during FY 93 and FY 94. LDRD funds were also used to explore a related technique, charge force microscopy, for voltage probing of ICs. This report describes the technical work performed under this LDRD as well as the outcomes of the project in terms of publications and awards, intellectual property and licensing, synergistic work, potential future work, hiring ofmore » additional permanent staff, and benefits to DOE`s defense programs (DP).« less

  15. Behaviour patterns of Mallard Anas Platyrhynchos pairs and broods in Minnesota and North Dakota

    USGS Publications Warehouse

    Pietz, P.J.; Buhl, D.A.

    1999-01-01

    Few studies have quantitatively examined Mallard behaviour in North America during the breeding season. We estimated diurnal time budgets of unmarked Mallard males, females, and broods from over 1,200 hours of observations at two study areas in western Minnesota and south-central North Dakota during 1988-91. Paired males spent less time feeding and more time alert than did females. Both pair members were engaged in the same behaviour about 67% of the time; the male was always most likely to be doing the same thing as the female, but when the male was resting on water or alert, the female was most likely to be feeding. Females with broods spent less time feeding and more time alert and in locomotion than did females without broods. Behaviour of brood females did not differ with brood age or size. Females temporarily left their broods alone 45 times - about once for each 11 hours of observation. Female absences ranged from 2 to >80 minutes (x>27 min); length of absence was not related to brood age or size. Broods of all ages (a few days old to near fledging) and sizes (1-10 ducklings) were left alone on land and water; broods mostly rested and fed during female absences. Brood females spent less time feeding and more time alert than did broods. Females and their broods were engaged in the same behaviour 6267% of the time; the female was always most likely to be doing the same behaviour as her brood, but when the female was resting on water, the brood was most likely to be feeding, and when the female was alert, the brood was most likely to be feeding (North Dakota site) or resting on land (Minnesota site). Daily activity patterns varied between sites for both pairs and broods. Feeding and resting behaviour showed opposite daily patterns, suggesting that time allocated to feeding constrained time spent resting. Differences between sites and years in time spent feeding by pairs and broods probably reflected varying water conditions and food availability. In light of these differences, we caution researchers against extrapolating from time budget data that are temporally or geographically limited.

  16. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less

  18. Survival of wood duck and mallard broods in north-central Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, I.J.; Gilmer, D.S.; Cowardin, L.M.

    Duckling survival in wood duck (Aix sponsa) and mallard (Anas platyrhynchos) broods was estimated from data obtained from 71 radio-marked brood hens on a study area in north-central Minnesota. Radio-marked hens produced 30 broods during the study, and 41 hens already leading broods were captured and radio-marked. Production estimates based on brood size counts were inflated by about 38 percent for wood ducks and 30 percent for mallards if total-brood losses were not taken into account. Mortality during the first 2 weeks of life was most severe, accounting for 86 percent of total recorded mortality in wood ducks and 70more » percent in mallards. Rearing success was about 41 percent for wood ducks and 44 percent for mallards. Duckling survival was negatively correlated with distance of overland travel by young broods. Wood ducks had a shorter hen-brood bond than mallards, and presence of the hen appeared to affect duckling survival less in wood duck broods than in mallards.« less

  19. The influence of temperature and photoperiod on the timing of brood onset in hibernating honey bee colonies

    PubMed Central

    Härtel, Stephan; Steffan-Dewenter, Ingolf

    2018-01-01

    In order to save resources, honey bee (Apis mellifera) colonies in the temperate zones stop brood rearing during winter. Brood rearing is resumed in late winter to build up a sufficient worker force that allows to exploit floral resources in upcoming spring. The timing of brood onset in hibernating colonies is crucial and a premature brood onset could lead to an early depletion of energy reservoirs. However, the mechanisms underlying the timing of brood onset and potential risks of mistiming in the course of ongoing climate change are not well understood. To assess the relative importance of ambient temperature and photoperiod as potential regulating factors for brood rearing activity in hibernating colonies, we overwintered 24 honey bee colonies within environmental chambers. The colonies were assigned to two different temperature treatments and three different photoperiod treatments to disentangle the individual and interacting effects of temperature and photoperiod. Tracking in-hive temperature as indicator for brood rearing activity revealed that increasing ambient temperature triggered brood onset. Under cold conditions, photoperiod alone did not affect brood onset, but the light regime altered the impact of higher ambient temperature on brood rearing activity. Further the number of brood rearing colonies increased with elapsed time which suggests the involvement of an internal clock. We conclude that timing of brood onset in late winter is mainly driven by temperature but modulated by photoperiod. Climate warming might change the interplay of these factors and result in mismatches of brood phenology and environmental conditions. PMID:29844964

  20. Medicare Program; FY 2017 Hospice Wage Index and Payment Rate Update and Hospice Quality Reporting Requirements. Final rule.

    PubMed

    2016-08-05

    This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2017. In addition, this rule changes the hospice quality reporting program, including adopting new quality measures. Finally, this final rule includes information regarding the Medicare Care Choices Model (MCCM).

  1. Overview Presentation

    NASA Technical Reports Server (NTRS)

    Lytle, John

    2001-01-01

    This report provides an overview presentation of the 2000 NPSS (Numerical Propulsion System Simulation) Review and Planning Meeting. Topics include: 1) a background of the program; 2) 1999 Industry Feedback; 3) FY00 Status, including resource distribution and major accomplishments; 4) FY01 Major Milestones; and 5) Future direction for the program. Specifically, simulation environment/production software and NPSS CORBA Security Development are discussed.

  2. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  3. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  4. 42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...

  5. Report of Secretary of Defense, Caspar W. Weinberger, to the Congress on the FY 1983 Budget, FY 1984 Authorization Request and FY 1983-1987 Defense Programs.

    DTIC Science & Technology

    1982-02-08

    although non-aligned, Malaysia , Indonesia, and Singapore support U.S. presence in South- east Asia and allow unhampered U.S. transit of the vital...modernization of obsolete facilities, maintenance of existing facilities, energy conservation, compliance with environmental and OSHA stan- dards, and NATO

  6. U.S. Army Research Institute 1983 Annual Report

    DTIC Science & Technology

    1983-10-01

    Olllc») v TYPE OF REPORT a PERIOD COVERED Annual; TY 1983 6 PERFORMING ORG. REPORT NUMBER 6. CONTRACT OR GRANT NUMBERf«) 10. PROGRAM ELEMENT...AtTWACT tCmSm mm nrmam «M» W nmommmr —ä Idomlllr br Mock mnkw; An overview of the FY83 research program la presented in terms of these five research...awards, in-house publication«, professional publications and pres- entations, FY83 program management (mission, the core program , the three component

  7. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  8. NASA's Microgravity Technology Report, 1996: Summary of Activities

    NASA Technical Reports Server (NTRS)

    Kierk, Isabella

    1996-01-01

    This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.

  9. Varroa Sensitive Hygiene and Drone Brood

    USDA-ARS?s Scientific Manuscript database

    Honey bees have been bred to express high levels of varroa sensitive hygiene (VSH), which is the removal of mite-infested pupae from capped worker brood. This hygienic behavior is a complex interaction of bees and brood in which brood cells sometimes are inspected, and then brood is either removed (...

  10. Human genome. 1993 Program report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    The purpose of this report is to update the Human Genome 1991-92 Program Report and provide new information on the DOE genome program to researchers, program managers, other government agencies, and the interested public. This FY 1993 supplement includes abstracts of 60 new or renewed projects and listings of 112 continuing and 28 completed projects. These two reports, taken together, present the most complete published view of the DOE Human Genome Program through FY 1993. Research is progressing rapidly toward 15-year goals of mapping and sequencing the DNA of each of the 24 different human chromosomes.

  11. Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program

    DTIC Science & Technology

    2015-05-01

    spell out) originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description...does not display a currently valid OMB control number . 1. REPORT DATE MAY 2015 2. REPORT TYPE 3. DATES COVERED 4. TITLE AND SUBTITLE Review...of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  12. Carbon dioxide sensing in the social context: Leaf-cutting ants prefer elevated CO2 levels to tend their brood.

    PubMed

    Römer, Daniela; Bollazzi, Martin; Roces, Flavio

    2018-07-01

    Social insects show temperature and humidity preferences inside their nests to successfully rear brood. In underground nests, ants also encounter rising CO 2 concentrations with increasing depth. It is an open question whether they use CO 2 as a cue to decide where to place and tend the brood. Leaf-cutting ants do show CO 2 preferences for the culturing of their symbiotic fungus. We evaluated their CO 2 choices for brood placement in laboratory experiments. Workers of Acromyrmex lundii in the process of relocating brood were offered a binary choice consisting of two interconnected chambers with different CO 2 concentrations. Values ranged from atmospheric to high concentrations of 4% CO 2 . The CO 2 preferences shown by workers for themselves and for brood placement were assessed by quantifying the number of workers and relocated brood in each chamber. Ants showed clear CO 2 preferences for brood placement. They avoided atmospheric levels, 1% and 4% CO 2 , and showed a preference for levels of 3%. This is the first report of CO 2 preferences for the maintenance of brood in social insects. The observed preferences for brood location were independent of the workers' own CO 2 preferences, since they showed no clear-cut pattern. Workers' CO 2 preferences for brood maintenance were slightly higher than those reported for fungus culturing, although brood is reared in the same chambers as the fungus in leaf-cutting ant nests. Workers' choices for brood placement in natural nests are likely the result of competing preferences for other environmental factors more crucial for brood survival, aside from those for CO 2 . Copyright © 2018 Elsevier Ltd. All rights reserved.

  13. Polygyny and its fitness consequences for primary and secondary female pied flycatchers

    PubMed Central

    Huk, Thomas; Winkel, Wolfgang

    2006-01-01

    In polygynous species with biparental care, the amount of paternal support often varies considerably. In the pied flycatcher (Ficedula hypoleuca), females mated with monogamous males receive more male assistance during the nestling phase than females mated with bigynous males, as the latter have to share their mates with another female. Bigynous males, however, give more support to their primary broods than to their secondary broods. Using a long-term dataset (31 years), the present study revealed that direct reproductive success, i.e. number of fledglings, was lower in females that mated with bigynous males, especially in secondary broods without male assistance, than in females that mated with monogamous males. Secondary broods with male assistance were more affected than primary broods. Female survival was independent of mating status. In primary broods, a delayed compensation for inferior direct reproductive success was found in terms of the number of grandoffspring, a phenomenon that did not occur in secondary broods. Delayed compensation in primary broods refers to indirect effects, i.e. good genes. According to the sexy son hypothesis, genetically superior (i.e. sexy) males may have sons with a higher number of broods belonging to a polygynous breeding status than do sons from broods with a monogamous father. This was indeed the case for sons descending from primary broods, but not for sons descending from secondary broods. PMID:16769641

  14. Overview of Doing Business with SPAWAR Systems Command (SPAWAR)

    DTIC Science & Technology

    2011-08-22

    School Girls Day Out FY07 – 1 school FY08 – 34 schools FY09 – 35 schools FY10 – 47 schools Material World Modules International Autonomous Underwater...s it e , a n d a ls o f rom t h e foll o vn n g link: e-CC Self -Service News The 23rd P.nnual Na v y Gold Coast Small Business O pportunity Conf...Opportunities 1. Requirements Office: Joint Program Manager - Information Systems (JPMIS) 2. Joint Effects Model (JEM) Increment 1 Sustainment 3

  15. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation FY 1982. Supporting Data FY 1982. Supporting Data FY 1982, Budget Estimate Submitted to Congress January 1981, Amended 30 March 1981. Volume III.

    DTIC Science & Technology

    1981-01-01

    ACTIVITIES .......... ............................ 111-548 3/ de ~ &04A.... ~UNCLASSIFIED xiii 0- 4 UNCLASSIFIED FY 1932 ROTE CONGRESSIONAI. DESCRIPTIVE...Title: Comeunicatiois gnlineerin De -elo pmnt DOD Mission Area: i256 - Tactical Communications Sudget Activity: 04 - TactictI Programs Into the...tconditions ot heavy miiltary traffic, high speeds, and severe weather. Army Remote Sensors (REMS) were used to provide 4-cnrity of the Olympic Village complex

  16. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  17. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  18. Activities in Idaho; status of projects, fiscal years 1982-83

    USGS Publications Warehouse

    Channel, Linda K.

    1982-01-01

    Twenty-three projects were conducted by the Water Resources Division of the U.S. Geological Survey in Idaho during FY 's (fiscal year) 1982-83. These projects were done in cooperation with seven State and local and nine federal agencies. State and local cooperative funding amounted to $566,123 in FY 1982 and $570,000 (projected monies) in FY 1983; Federal funding amounted to $2,083,748 in FY 1982 and $1,656,494 (projected monies) in FY 1983. Eighty-three persons were employed as of September, FY 1982--40 full time and 43 other than full time. Sixty-five persons were employed as of October, FY 1983--35 full time and 30 other than full time. In addition, the Water Resources Division maintains a project office at the Idaho National Engineering Laboratory. Work there is done in cooperation with the U.S. Department of Energy, which provides most of the funding. Some Federal funds are provided for special projects. Projects other than continuing programs for collection of hydrologic data included flood-mapping studies, geothermal-resource investigations, groundwater-quality assessments, basin-and region-wide water-resource investigations , river quality-of-water monitoring studies, volcanic-ash-related studies, groundwater trends and stream gaging-program evaluations, river erosion and sediment-transport studies, water-budget and groundwater-use determinations, and a sole-source aquifer appraisal. (USGS)

  19. Food poisoning associated with ingestion of wild wasp broods in the upstream region of the Lancang river valley, Yunnan province, China.

    PubMed

    Jiang, Li; Huang, Tian

    2018-04-01

    Food poisoning due to wild wasp broods ingestion has long been noted in the upstream region of the Lancang river valley, Yunnan province, China. This study describes the epidemiological and clinical features of the poisoning and possible causes. Surveillance data collected between 2008 and 2016 were analyzed to produce demographic data on patients, information on clinical presentations, wasp species identification, and estimations of possible risk factors for symptomatic cases. Eleven poisoning events were associated with the ingestion of wild wasp broods, including 46 exposed persons with 31 symptomatic living cases and 8 deceased cases that were reported in the Yunnan province between 2008 and 2016. Poisoning cases were only detected in the upstream region of the Lancang river valley in the autumn. The severity of the symptoms was correlated with an evident dose-effect relationship regarding the quantity ingested. The mean latent period from wild wasp broods ingestion to the onset of the symptoms was 10 h for symptomatic living cases and 7 h for deceased cases, respectively. Both gastrointestinal and neurological symptoms were commonly observed in the poisoning cases. The toxin source may be indirectly caused by the wasp broods due to the prevalence of local poisonous plants, such as Tripterygium wilfordii Hook F, Tripterygium hypoglaucum Hutch and Vaccinium bracteatum Thunb. Educational programs at the start of wasp harvest season in September in the high-risk area should be carried out to reduce the incidence of poisonings. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Interior, Environment, and Related Agencies: FY2007 Appropriations

    DTIC Science & Technology

    2007-03-07

    reported bill for FY2007, from the FY2006 level, were the following: ! $-209.5 million (9%) for the National Park Service (NPS); ! $-153.5 million (10%) for...Humphries RSI 7-7264 mhumphries@crs.loc.gov National Park Service David Whiteman RSI 7-7786 dwhiteman@crs.loc.gov Payments in Lieu of Taxes Program (PILT) M...11 National Wildlife Refuge System and Law Enforcement . . . . . . . . . . 12 Avian Flu

  1. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2008-11-20

    including political, security, social environment, and best ways to engage local populations) in designing new embassies buildings. In the funding...political, economic, and social reforms. The President initially promised $5 billion annually by FY2006, although funds requested and appropriated...other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian, Tibetan

  2. FY 1978 Budget, FY 1979 Authorization Request and FY 1978-1982 Defense Programs,

    DTIC Science & Technology

    1977-01-17

    technological opportunities with defense applica- tions -- such as long-range cruise missiles and guidance, improved sensors, 25 miniaturization, and computer ...Various methods exist for computing the number of theater nuclear weapons needed to perform these missions with an acceptable level of confidence...foreign military forces. Mini-micro computers are especially interesting. -- Finally, since geography remains important, we must recognize that the

  3. FY 2014 Educational Facilities Master Plan and Amendments to the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2013

    2013-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…

  4. Superintendent's Recommended FY 2012 Capital Budget and Amendments to the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…

  5. Superintendent's Recommended FY 2011 Capital Budget and the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2009

    2009-01-01

    In November 1996, the voters of Montgomery County approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County Council would…

  6. Superintendent's Recommended FY 2014 Capital Budget and Amendments to the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  7. Superintendent's Recommended FY 2008 Capital Budget & Amendments to the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  8. Energy Engineering Analysis Program, limited energy study of steam distribution systems, Hawthorne Army Ammunition Depot, Hawthorne, Nevada. Programming documents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The project is a significant part of Hawthorne Army Ammunition Depot`s effort to achieve a 20-percent reduction in energy consumption by FY2000 versus FY1985 baseline levels. The project will also assure that heating services are provided to Industrial Area facilities on a continuing basis, supporting mission requirements.

  9. Inspector General, DoD, Oversight of the Army Audit Agency Audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996 Financial Statements

    DTIC Science & Technology

    1997-04-10

    The audit objective was to determine the accuracy and completeness of the audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996...financial statements conducted by the Army Audit Agency. See Appendix C for a discussion of the audit process.

  10. COSAM program overview

    NASA Technical Reports Server (NTRS)

    Stephens, J. R.

    1982-01-01

    The COSAM program for reduction of the use of strategic alloying elements in nickel-based superalloys for gas turbine engines was reviewed. Sources, consumption, and pricing of cobalt, tantalum, columbium, and chromium are surveyed. Research projects in strategic element substitution, advanced processing concepts, and the development of alternate materials (intermetallics and iron-base alloys) are listed and research plans for FY 1983 and FY 1984 summarized.

  11. Superintendent's Recommended FY 2009 Capital Budget and the FY 2009-2014 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2007

    2007-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…

  12. FY 1986 science budget overview

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.; Robb, David W.

    Continental lithosphere research, scientific ocean drilling, investigative surveys in the Exclusive Economic Zone, and the Mars Observer were among those programs that fared best in the federal budget proposal for fiscal year (FY) 1986 that President Ronald Reagan sent to Congress last week. However, the Sea Grant and Coastal Zone Management programs were among those that fell victim to the budget ax once again.

  13. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM. ANNUAL REPORT TO THE DEPARTMENT OF ENERGY, DECEMBER 1998.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OGEKA,G.J.

    1998-12-31

    In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  14. NREL Energy Storage Projects. FY2014 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pesaran, Ahmad; Ban, Chunmei; Burton, Evan

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Batterymore » Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.« less

  15. Research and development strategic plan : FY2013-FY2017.

    DOT National Transportation Integrated Search

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  16. 50 CFR 86.41 - How long will the money be available?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE... obligation for a total of three fiscal years (e.g. FY 2000 funds will remain available through FY 2002) (16 U...

  17. 78 FR 61202 - Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... Billing for Skilled Nursing Facilities for FY 2014; Correction AGENCY: Centers for Medicare & Medicaid...; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2014.'' DATES: These...

  18. Medicare program; revisions to FY 2009 Medicare severity-long-term care diagnosis-related group (MS-LTC-DRG) weights. Interim final rule with comment period.

    PubMed

    2009-06-03

    This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).

  19. Observations on the removal of brood inoculated with Tropilaelaps mercedesae (Mesostigmata: Laelapidae) and the mite’s reproductive success in Apis mellifera colonies

    USDA-ARS?s Scientific Manuscript database

    This study assessed the response of Apis mellifera to brood deliberately infested with Tropilaelaps mercedesae. The reproductive success of T. mercedesae in mite-inoculated and naturally infested brood was also compared. The presence of T. mercedesae inside brood cells significantly affected brood ...

  20. Insufficient Governance Over Logistics Modernization Program System Development

    DTIC Science & Technology

    2010-11-02

    Controls Over the Prevalidation of DOD Commercial Payments,” March 2, 2007 Army USAAA Report No. A-2007-0205- FFM , “Logistics Modernization Program...0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 USAAA Report No. A-2007-0154-ALR, “Follow up...Audit of Aged Accounts–U.S. Army Communications-Electronics Life Cycle Management Command,” July 2, 2007 USAAA Report No. A-2006-0234- FFM

  1. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  2. A comparison of two waterfowl brood survey techniques

    Treesearch

    Mark A. Rumble; Lester D. Flake

    1982-01-01

    Aerial surveys, brood beat outs, road surveys, and brood observations have been used to estimate numbers of waterfowl broods (M. E. Anderson, unpubl. reps., South Dakota Dep. Game, Fish, and Parks Fed. Aid Proj. W-17-R-7 and 8,1953, 1955; Bennett 1967). M. C. Hammond (unpubl. rep., U.S. Bur. Sport Fish and Wildl., 1970) summarized several brood survey techniques and...

  3. Habitat selection and movements of Piping Plover broods suggest a tradeoff between breeding stages

    USGS Publications Warehouse

    Wiltermuth, Mark T.; Anteau, Michael J.; Sherfy, Mark H.; Pearse, Aaron T.

    2015-01-01

    In precocial birds, adults select breeding areas using cues associated with habitat characteristics that are favorable for nesting success and chick survival, but there may be tradeoffs in habitat selection between these breeding stages. Here we describe habitat selection and intra-territory movements of 53 Piping Plover (Charadrius melodus) broods (320 observations) during the 2007–2008 breeding seasons on mainland- and island-shoreline habitats at Lake Sakakawea, North Dakota, USA. We used remotely sensed habitat characteristics to separately examine habitat selection and movements at two spatiotemporal scales to account for potential confounding effects of nest-site selection on brood-rearing habitat used. The scales used were (1) the entire brood-rearing period within available brood-rearing areas and (2) 2-day observation intervals within age-specific discrete habitat selection choice sets. Analyses at both scales indicated that broods selected areas which were non-vegetated, moderately level, and nearer to the shoreline. Rate of brood movement increased with age up to 5 days, then stabilized; broods that hatched >50 m away from the shoreline moved toward the shoreline. Brood movements were greater when they were in vegetated areas, when the brood-rearing area was of greater topographic complexity, and when broods aged 6–25 days were further away from the shoreline. Using inferences from our results and those of previously published work, we postulate how a potential tradeoff in habitat selection between nesting and brood-rearing can contribute to an ecological trap in a novel habitat. This work, in the context of published works, suggests that plover breeding habitat is a complex of both nesting and brood-rearing habitats and provides a basis for making remotely sensed abundance estimates of suitable breeding habitat for Piping Plovers.

  4. LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, Diane

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.

  5. LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bookless, William

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.

  6. LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, D.

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.

  7. Summary of Pellet Technology Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gebhart, III, Gerald E.; Baylor, Larry R.; Bell, Gary L.

    This report summarizes the activities and budget information of ORNL’s pellet technology program from the start of FY2014 through FY2017. Cost summaries are broken down by year and spending category. Milestone activities are outlined and described by year and further described in the project narrative. The project narrative outlines the main pellet injection technology advances enabled by the pellet technology program. A list of published research products is included, along with biographies of personnel involved. This document was prepared in support of the April 24, 2018, review of the pellet technology program at ORNL.

  8. A profile of Hawaiians in the Medicaid Fee-For-Service program.

    PubMed

    Loke, M; Kang-Kaulupali, K T; Honbo, L

    2001-09-01

    In Hawai'i, the Medicaid Fee-For-Service (FFS) program enrolled approximately 39,000 individuals in fiscal year (FY) 1999. This program specifically provides healthcare services to enrollees classified as aged, blind, disabled, in-state foster children, and children who live out-of-state in subsidized adoptions. The total expenditure associated with this program was over $300 million in FY 1999. Nearly 4,600 enrollees in the Medicaid FFS program were self-identified as Native Hawaiians or part-Hawaiians. Although the proportion of Hawaiians in the Medicaid program was a fair representation of Hawaiians in the state, the distribution by recipient category within the program was in sharp contrast. Aged Hawaiians appeared to be under-represented in the program while disabled Hawaiians were overrepresented. Foster children and children under subsidized adoption accounted for 1% of the total Hawaiian population. Excluding the foster children and children under subsidized adoption, recipients of Hawaiian ancestry in the Medicaid FFS program (aged, blind, and disabled) obtained health care services amounting to approximately $34 million in FY 1999. Females in this population received more services, with total Medicaid payments amounting to $18.7 million. A higher proportion of Hawaiian recipients were on the neighbor islands. In this FFS Hawaiian population, the top three disease-states by dollar volume in FY 1999, were Alzheimer's disease, acute cerebrovascular disease, and profound mental retardation. A total of $3 million in services were provided to recipients with these primary disease-states. The five leading disease-states facing Hawaiians were generally comparable to those confronting the overall FFS population.

  9. Defense: FY2013 Authorization and Appropriations

    DTIC Science & Technology

    2012-09-05

    dollars and overturn several cost- cutting initiatives incorporated in the Administration’s budget, including proposed reductions in the Air Force...deficit reduction through FY2021 of $2.1 trillion). In FY2013, the BCA requires an across the board cut in budget authority (or “sequester”) that would...some $59 billion—about 10 percent—would be cut from the Administration’s budget request, with equal percentages cut from each program, project

  10. Laboratory Directed Research and Development FY-15 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pillai, Rekha Sukamar

    The Laboratory Directed Research and Development (LDRD) Program at Idaho National Laboratory (INL) reports its status to the U.S. Department of Energy (DOE) by March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. LDRD funds are obtained through a charge to all INL programs. This report includes summaries of all INL LDRD research activities supported during Fiscal Year (FY) 2015.

  11. Management implications of brood division in Golden-winged Warblers: Chapter 10

    USGS Publications Warehouse

    Peterson, Sean M.; Streby, Henry M.; Andersen, David E.

    2016-01-01

    Brood division in the postfledging period is a common avian behavior that is not well understood. Brood division has been reported in Golden-winged Warblers (Vermivora chrysoptera), but it is not known how common this behavior is, whether males and females exhibit different strategies related to parental care and habitat use, or how brood division might influence management strategies. We radiomarked fledglings and monitored divided broods of Golden-winged Warblers from fledging until independence from parental care at three sites in the western Great Lakes region from 2010 to 2012 to assess differences in strategies between male and female parents and to consider possible management implications. Male - and female-reared sub-broods exhibited different space use during the dependent post-fledging period despite similar fledgling survivial, cover-type use, and microhabitat use. By independence, female-reared sub-broods traveled over twice as far from the nest (mean = 461 ± 81) SE m) as male-reared sub-broods (164 ± 41 m). Additionally, female-reared sub-broods traveled over three times as far from the natal patch edge (35 ± 72 m) as male-reared sub-broods (108 ± 36 m). Without accounting for differential space use by male- and female-reared sub-broods, we would have reported broods traveling 292 (± 46 m) from the nest and 214 (± 40m) from the natal patch edge - distances that do not reflect how far females move sub-broods. Parental strategies differ between sexes with regard to movement patterns, and we recommend incorporating the differences in space use between sexes in future management plans for Golden-winged Warblers  and other species that employ brood division. Specifically, management actions might be most effective when they are applied at spatial scales large enough to incorporate the habitat requirements of both sexes throughout the entire reproductive season. 

  12. ADVANTAGES AND DISADVANTAGES OF EGRET AND HERON BROOD REDUCTION.

    PubMed

    Mock, Douglas W; Parker, Geoffrey A

    1986-05-01

    Data from great egrets and great blue herons were used to test a fundamental assumption of Lack's brood-reduction hypothesis, that mortality is brood-size dependent. This was confirmed for the largest brood sizes (4 and 3), which, in egrets, also have the highest sib-fighting rates. Broods of one, however, experienced paradoxically high mortality, especially early in the season. The hypothesis is advanced that parents desert unprofitably small broods when sufficient time remains for production of a larger brood. A simple game-theory model shows that this parental desertion may hinge primarily on the overall costs of renesting. Egret brood reduction caused by sibling aggression (siblicide) occurred later than less aggressive forms of brood reduction. The inclusive fitness of senior broodmates is maximized by the successful fledging of all sibs, and the physical superiority of seniors (in food-handling for herons; food-handling and aggression for egrets) usually suffices to guarantee their own welfare in brood competitions. Finally, it is shown that the last chick in asynchronously hatching broods represents two kinds of reproductive value (RV) to the parents-"extra RV" (obtained despite the survival of elder sibs) and "insurance RV" (obtained only when at least one elder sib dies first)-which can be distinguished from field data. This approach can be used in comparisons with other asynchronous species for partitioning the fitness contributions of marginal offspring. © 1986 The Society for the Study of Evolution.

  13. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.« less

  14. US Navy FY 1997 Research Program

    DTIC Science & Technology

    1997-09-30

    US NAVY FY 1997 RESEARCH PROGRAM Henry E. Bass National Center for Physical Acoustics University of Mississippi University, MS 38677 Phone: (601...232-5905 Fax: (601) 232-7494 Email: pabass@olemiss.edu Award Number: N00014-95-1-1306 LONG-TERM GOALS The National Center for Physical Acoustics ...NCPA) provides an integrated physical acoustics laboratory to facilitate research in sound propagation and attenuation, molecular and chemical physics

  15. Accelerated Progress Through Self-Determination. Second Annual Report of the Choctaw Self-Determination Project, July 1, 1972 - October 31, 1973.

    ERIC Educational Resources Information Center

    Mississippi Band of Choctaw Indians, Philadelphia.

    Self-determination for the Choctaw tribal government and its people was reflected in the progress made in program development. Programs in effect during fiscal year (FY) 1973 covered the full range of economic and social needs of the Choctaw people. Designed to complement the progress achieved during FY 1972, the following four developmental…

  16. Opportunistic brood theft in the context of colony relocation in an Indian queenless ant

    PubMed Central

    Paul, Bishwarup; Paul, Manabi; Annagiri, Sumana

    2016-01-01

    Brood is a very valuable part of an ant colony and behaviours increasing its number with minimum investment is expected to be favoured by natural selection. Brood theft has been well documented in ants belonging to the subfamilies Myrmicinae and Formicinae. In this study we report opportunistic brood theft in the context of nest relocation in Diacamma indicum, belonging to the primitively eusocial subfamily Ponerinae. Pupae was the preferred stolen item both in laboratory conditions and in natural habitat and a small percentage of the members of a colony acting as thieves stole about 12% of the brood of the victim colony. Stolen brood were not consumed but became slaves. We propose a new dimension to the risks of relocation in the form of brood theft by conspecific neighbours and speculate that examination of this phenomenon in other primitively eusocial species will help understand the origin of brood theft in ants. PMID:27796350

  17. Opportunistic brood theft in the context of colony relocation in an Indian queenless ant.

    PubMed

    Paul, Bishwarup; Paul, Manabi; Annagiri, Sumana

    2016-10-31

    Brood is a very valuable part of an ant colony and behaviours increasing its number with minimum investment is expected to be favoured by natural selection. Brood theft has been well documented in ants belonging to the subfamilies Myrmicinae and Formicinae. In this study we report opportunistic brood theft in the context of nest relocation in Diacamma indicum, belonging to the primitively eusocial subfamily Ponerinae. Pupae was the preferred stolen item both in laboratory conditions and in natural habitat and a small percentage of the members of a colony acting as thieves stole about 12% of the brood of the victim colony. Stolen brood were not consumed but became slaves. We propose a new dimension to the risks of relocation in the form of brood theft by conspecific neighbours and speculate that examination of this phenomenon in other primitively eusocial species will help understand the origin of brood theft in ants.

  18. Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1

    DTIC Science & Technology

    1991-09-01

    91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH

  19. Electric Propulsion Test & Evaluation Methodologies for Plasma in the Environments of Space and Testing (EP TEMPEST) (Briefing Charts)

    DTIC Science & Technology

    2015-04-01

    in the Environments of Space and Testing (EP TEMPEST ) - Program Review (Briefing Charts) 5a. CONTRACT NUMBER In-House 5b. GRANT NUMBER 5c...of Space and Testing (EP TEMPEST ) AFOSR T&E Program Review 13-17 April 2015 Dr. Daniel L. Brown In-Space Propulsion Branch (RQRS) Aerospace Systems...Statement A: Approved for public release; distribution is unlimited. EP TEMPEST (Lab Task, FY14-FY16) Program Goals and Objectives Title: Electric

  20. FY98 Class Convening Schedule for Coast Guard Class

    DOT National Transportation Integrated Search

    1998-08-12

    This Notice publishes the FY98 class convening schedule of Coast Guard Class "A" : and "C" resident and exportable training courses defined by program/force : managers as essential or directly related to mission accomplishment for : achievement of pr...

  1. Laboratory Directed Research and Development FY 2000 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Ayat, R

    This Annual Report provides an overview of the FY2000 Laboratory Directed Research and Development (LDRD) Program at Lawrence Livermore National Laboratory (LLNL) and presents a summary of the results achieved by each project during the year.

  2. Cryptic extended brood care in the facultatively eusocial sweat bee Megalopta genalis.

    PubMed

    Quiñones, A E; Wcislo, W T

    As a result of different brood cell provisioning strategies, nest-making insects may differ in the extent to which adults regularly provide extended parental care to their brood beyond nest defense. Mass-provisioning species cache the entire food supply needed for larval development prior to the oviposition and typically seal the brood cell. It is usually assumed that there is no regular contact between the adult(s) and brood. Here, we show that the bee, Megalopta genalis , expresses a form of cryptic brood care, which would not be observed during normal development. Following experimental injections of different provisioning materials into brood cells, foundresses reopened manipulated cells and the brood were aborted in some cases, implying that the foundresses assessed conditions within the cells. In aborted cells, foundresses sometimes laid a second egg after first removing dead larvae, previously stored pollen and contaminants. Our results show that hygienic brood care can be cryptic and hence may be more widespread than previously believed, lending support to the hypothesis that extended parental care is a preadaptation toward eusociality.

  3. Designing an effective statewide tobacco control program--Massachusetts.

    PubMed

    Connolly, G; Robbins, H

    1998-12-15

    Smoking-related illnesses kill > 10,000 Massachusetts residents each year and cost hundreds of millions of dollars of public and private expenditures for health care. To combat this public health problem, in 1992 Massachusetts voters approved a referendum question calling for an increased excise tax on tobacco products, with the revenue supporting a Health Protection Fund. Approximately 40% of the fund is used to finance the Massachusetts Tobacco Control Program (MTCP), administered by the Massachusetts Department of Public Health. During the first 3 fiscal years (FY), the MTCP budget has averaged just over $40 million annually, declining during that period from approximately $43 million in FY 1995 to < $37 million in FY 1997.

  4. Report of Secretary of Defense, Harold Brown, to the Congress on the FY 1982 Budget, FY 1983 Authorization Request and FY 1982-1986 Defense Programs

    DTIC Science & Technology

    1981-01-19

    a " high -low" mix of high performance ...meet the common threat. 86 Considerable progress is being made. Last year, Japanese ships and aircraft performed very capably in a joint naval exercise... high school graduates, however, does not mean that a high school diploma is necessarily a predictor of on-the-job performance in the military.

  5. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    DTIC Science & Technology

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  6. Intelligence Spending and Appropriations: Issues for Congress

    DTIC Science & Technology

    2013-09-05

    while the MIP grew at a slower pace. The NIP budget in 2001 (then referred to as the National Foreign Intelligence Program— NFIP ) was roughly $24 billion...House Appropriations Committee (HAC) disclosure, adjusted for inflation. The Committee indicated that the Administration’s FY1995 NFIP request was...to shows funding for the National Foreign Intelligence Program. The FY1995 figure is therefore a useful proxy for the NFIP budget in FY2001. 13 DNI

  7. Revised congressional budget request, FY 1982. Conservation and renewable energy program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-03-01

    Programs dealing with conservation and renewable energy are reprinted from the Revised Congressional Budget Request FY 1982. From Volume 7, Energy Conservation, information is presented on: buildings and community systems; industrial programs; transportation programs; state and local programs; inventor's program energy conversion technology; energy impact assistance; and residential/commercial retrofit. From Volume 2, Energy Supply Research and Development, information and data are presented on: solar building applications; solar industrial applications; solar power applications; solar information systems; SERI facility; solar international activities; alcohol fuels; geothermal; and hydropower. From Volume 6, Energy Production, Demonstration, and Distribution, information and data on solar energy production,more » demonstration, and distribution are presented. From Volume 3, Energy Supply and R and D Appropriation, information and data on electric energy systems and energy storage systems are included. From Volume 4, information and data are included on geothermal resources development fund. In Volume 5, Power Marketing Administrations, information and data are presented on estimates by appropriations, positions and staff years by appropriation, staffing distribution, and power marketing administrations. Recissions and deferrals for FY 1981 are given. (MCW)« less

  8. Enabling propulsion materials for high-speed civil transport engines

    NASA Technical Reports Server (NTRS)

    Stephens, Joseph R.; Herbell, Thomas P.

    1992-01-01

    NASA Headquarters and LeRC have advocated an Enabling Propulsion Materials Program (EPM) to begin in FY-92. The High Speed Research Phase 1 program which began in FY-90 has focused on the environmental acceptability of a High Speed Civil Transport (HSCT). Studies by industry, including Boeing, McDonnell Douglas, GE Aircraft Engines, and Pratt & Whitney Aircraft, and in-house studies by NASA concluded that NO(x) emissions and airport noise reduction can only be economically achieved by revolutionary advancements in materials technologies. This is especially true of materials for the propulsion system where the combustor is the key to maintaining low emissions, and the exhaust nozzle is the key to reducing airport noise to an acceptable level. Both of these components will rely on high temperature composite materials that can withstand the conditions imposed by commercial aircraft operations. The proposed EPM program will operate in conjunction with the HSR Phase 1 Program and the planned HSR Phase 2 program slated to start in FY-93. Components and subcomponents developed from advanced materials will be evaluated in the HSR Phase 2 Program.

  9. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  10. Annual Plan for the EPA and CSB - FY 2018

    EPA Pesticide Factsheets

    Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.

  11. 77 FR 26751 - Integrated Risk Information System (IRIS); Announcement of 2012 Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ...-41-4. ethylene oxide (cancer) 75-21-8. formaldehyde \\1\\ 50-00-0. hexabromocyclododecane (mixed 3194...\\. octamethylcyclotetrasiloxane 556-67-2 FY13. (D4) \\2\\. 1,2-dichloroethane (ethylene 107-06-2 FY14. dichloride) \\1,3...

  12. Male death resulting from hybridization between subspecies of the gypsy moth, Lymantria dispar

    PubMed Central

    Higashiura, Y; Yamaguchi, H; Ishihara, M; Ono, N; Tsukagoshi, H; Yokobori, S; Tokishita, S; Yamagata, H; Fukatsu, T

    2011-01-01

    We explored the origin of all-female broods resulting from male death in a Hokkaido population of Lymantria dispar through genetic crosses based on the earlier experiments done by Goldschmidt and by testing for the presence of endosymbionts that are known to cause male killing in some insect species. The mitochondrial DNA haplotypes of the all-female broods in Hokkaido were different from those of normal Hokkaido females and were the same as those widely distributed in Asia, including Tokyo (TK). Goldschmidt obtained all-female broods through backcrossing, that is, F1 females obtained by a cross between TK females (L. dispar japonica) and Hokkaido males (L. dispar praeterea) mated with Hokkaido males. He also obtained all-male broods by mating Hokkaido females with TK males. Goldschmidt inferred that female- and male-determining factors were weakest in the Hokkaido subspecies and stronger in the Honshu (TK) subspecies. According to his theory, the females of all-female broods mated with Honshu males should produce normal sex-ratio broods, whereas weaker Hokkaido sexes would be expected to disappear in F1 or F2 generations after crossing with the Honshu subspecies. We confirmed both of Goldschmidt's results: in the case of all-female broods mated with Honshu males, normal sex-ratio broods were produced, but we obtained only all-female broods in the Goldschmidt backcross and obtained an all-male brood in the F1 generation of a Hokkaido female crossed with a TK male. We found no endosymbionts in all-female broods by 4,′6-diamidino-2-phenylindole (DAPI) staining. Therefore, the all-female broods observed in L. dispar are caused by some incompatibilities between Honshu and Hokkaido subspecies. PMID:20628417

  13. TRAC-Monterey FY16 Work Program Development and Report of Research Elicitation

    DTIC Science & Technology

    2016-01-01

    any changes to priorities or additional projects that require immediate research. Work Program; Research Elicitation Unclassified UU UU UU UU 35 MAJ...conduct analysis for the Army. 1 Marks, Chris, Nesbitt, Peter. TRAC FY14 Research Requirements Elicitation . Technical Report TRAC-M-TM-13-059. 700 Dyer... Requirements Elicitation Interviews Interview Guide: 1. Describe a research requirement in the areas of topics, techniques, and methodologies. 2

  14. Go East for Better Honey Bee Health: Apis cerana Is Faster at Hygienic Behavior than A. mellifera.

    PubMed

    Lin, Zheguang; Page, Paul; Li, Li; Qin, Yao; Zhang, Yingying; Hu, Fuliang; Neumann, Peter; Zheng, Huoqing; Dietemann, Vincent

    2016-01-01

    The poor health status of the Western honey bee, Apis mellifera, compared to its Eastern counterpart, Apis cerana, is remarkable. This has been attributed to lower pathogen prevalence in A. cerana colonies and to their ability to survive infestations with the ectoparasitic mite, Varroa destructor. These properties have been linked to an enhanced removal of dead or unhealthy immature bees by adult workers in this species. Although such hygienic behavior is known to contribute to honey bee colony health, comparative data of A. mellifera and A. cerana in performing this task are scarce. Here, we compare for the first time the removal of freeze-killed brood in one population of each species and over two seasons in China. Our results show that A. cerana was significantly faster than A. mellifera at both opening cell caps and removing freeze-killed brood. The fast detection and removal of diseased brood is likely to limit the proliferation of pathogenic agents. Given our results can be generalized to the species level, a rapid hygienic response could contribute to the better health of A. cerana. Promoting the fast detection and removal of worker brood through adapted breeding programs could further improve the social immunity of A. mellifera colonies and contribute to a better health status of the Western honey bee worldwide.

  15. Go East for Better Honey Bee Health: Apis cerana Is Faster at Hygienic Behavior than A. mellifera

    PubMed Central

    Li, Li; Qin, Yao; Zhang, Yingying; Hu, Fuliang; Neumann, Peter; Zheng, Huoqing; Dietemann, Vincent

    2016-01-01

    The poor health status of the Western honey bee, Apis mellifera, compared to its Eastern counterpart, Apis cerana, is remarkable. This has been attributed to lower pathogen prevalence in A. cerana colonies and to their ability to survive infestations with the ectoparasitic mite, Varroa destructor. These properties have been linked to an enhanced removal of dead or unhealthy immature bees by adult workers in this species. Although such hygienic behavior is known to contribute to honey bee colony health, comparative data of A. mellifera and A. cerana in performing this task are scarce. Here, we compare for the first time the removal of freeze-killed brood in one population of each species and over two seasons in China. Our results show that A. cerana was significantly faster than A. mellifera at both opening cell caps and removing freeze-killed brood. The fast detection and removal of diseased brood is likely to limit the proliferation of pathogenic agents. Given our results can be generalized to the species level, a rapid hygienic response could contribute to the better health of A. cerana. Promoting the fast detection and removal of worker brood through adapted breeding programs could further improve the social immunity of A. mellifera colonies and contribute to a better health status of the Western honey bee worldwide. PMID:27606819

  16. Flow currents and ventilation in Langstroth beehives due to brood thermoregulation efforts of honeybees.

    PubMed

    Sudarsan, Rangarajan; Thompson, Cody; Kevan, Peter G; Eberl, Hermann J

    2012-02-21

    Beekeepers universally agree that ensuring sufficient ventilation is vital for sustaining a thriving, healthy honeybee colony. Despite this fact, surprisingly little is known about the ventilation and flow patterns in bee hives. We take a first step towards developing a model-based approach that uses computational fluid dynamics to simulate natural ventilation flow inside a standard Langstroth beehive. A 3-D model of a Langstroth beehive with one brood chamber and one honey super was constructed and inside it the honeybee colony was distributed among different clusters each occupying the different bee-spaces between frames in the brood chamber. For the purpose of modeling, each honeybee cluster was treated as an air-saturated porous medium with constant porosity. Heat and mass transfer interactions of the honeybees with the air, the outcome of metabolism, were captured in the porous medium model as source and sink terms appearing in the governing equations of fluid dynamics. The temperature of the brood that results from the thermoregulation efforts of the colony is applied as a boundary condition for the governing equations. The governing equations for heat, mass transport and fluid flow were solved using Fluent(©), a commercially available CFD program. The results from the simulations indicate that (a) both heat and mass transfer resulting from honeybee metabolism play a vital role in determining the structure of the flow inside the beehive and mass transfer cannot be neglected, (b) at low ambient temperatures, the nonuniform temperature profile on comb surfaces that results from brood incubation enhances flow through the honeybee cluster which removes much of the carbon-dioxide produced by the cluster resulting in lower carbon-dioxide concentration next to the brood, (c) increasing ambient (outside) air temperature causes ventilation flow rate to drop resulting in weaker flow inside the beehive. Flow visualization indicates that at low ambient air temperatures the flow inside the beehive has an interesting 3-D structure with the presence of large recirculating vortices occupying the space between honey super frames above the honeybee clusters in the brood chamber and the structure and strength of the flow inside and around the honeybee clusters changes as we increase the ambient air temperature outside the beehive. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Survival of juvenile ring-necked ducks on wetlands of different pH

    USGS Publications Warehouse

    McAuley, D.G.; Longcore, J.R.

    1988-01-01

    Brood and duckling survival of ring-necked ducks (Aythya collaris) was examined in relation to wetland water chemistry in eastcentral Maine during 1983-85. Daily survival rates (DSR) of broods and ducklings were determined for 381 ducklings from 64 broods by counts of each brood at 6-10-day intervals during broodrearing. Twelve of 64 females lost entire broods. Only 176 of 381 (46%) ducklings survived to fledge. Brood survival for the 45-day rearing period was 0.7731; duckling survival was 0.3707. Young ducklings (25 days) ducklings (0.9818/day) (P = 0.002). Survival rates of broods and ducklings did not differ among wetlands of high and low alkalinities. Brood survival did not differ among wetlands of different pH, but DSR of ducklings was lower (0.9763/day) on low-pH (6.1) wetlands (0.9816/day) (P = 0.049). Class lIb-III (25-45 days old) ducklings from the lowest-pH wetlands(6.5) had the highest DSR (0.9856) (P = 0.009).

  18. Department of the Navy Amended FY 1992/FY 1993 Biennial Budget Estimates. R,D,T, and E Descriptive Summaries Submitted to Congress January 1992. Research, Development, Test and Evaluation, Navy

    DTIC Science & Technology

    1992-01-01

    counications between technology producer (Navy RDT&X community) and technology customer (Navy/MarLne Corps operating forces). Program technological...Additional programs as rwured by Fleet customer . 3. (U) 1t 1993 Planes Identify issues and provide link to RDT&3 community. Projects will vary according to...fleet customer requLrements. 4. (U) Program to Cmpletions This is a continuing program. D. (U) WORK pIRFORIpD l: iN-DOSE: NsWC Dahlgren, VA; AC

  19. Brood amalgamation in the Bristle-thighed Curlew Numenius tahitiensis: process and function

    USGS Publications Warehouse

    Lanctot, Richard B.; Gill, Robert E.; Tibbitts, T.L.; Handel, Colleen M.

    1995-01-01

    Alloparental care in birds generally involves nonbreeding adults that help at nests or breeding adults that help raise young in communal nests. A less often reported form involves the amalgamation of broods, where one or more adults care for young that are not their own. We observed this phenomenon among Bristle-thighed Curlew Numenius tahitiensis broods in western Alaska during 1990–1992. Amalgamation of broods generally involved the formation of temporary and extended associations. Temporary associations were formed by the incidental convergence of broods soon after they left their nests. During this period, parents defended distinct brood-rearing areas, were antagonistic to conspecifics and remained together for less than 3 days. Extended associations formed when chicks were 1–2 weeks old. Here, parents and their broods occupied distinct, but adjacent, brood-rearing areas and moved around as a unit. Whether a brood participated in either temporary or extended associations or remained solitary appeared to depend on brood density in the immediate area and on hatching date. When chicks were 3–4 weeks old, aggregations of up to ten broods formed wherein young mixed and parents defended a common brood-rearing area. All broods (n = 48) that survived to fledging joined such aggregations. Alloparental care involved only antipredator defence and was not associated with activities such as feeding and brooding. Most female parents abandoned their broods shortly after the young could fly and when aggregations were forming. The female parent of a pair always deserted its young before or on the same day as the male parent and, in every aggregation, one or two males continued to tend young for about 5 days longer than other male parents. In most cases, adults deserted the young 2–6 days before the young departed the area when about 38 days old. Bristle-thighed Curlews also formed temporary associations with American and Pacific Golden Plover Pluvialis dominica and Pluvialis fulva, Whimbrel Numenius phaeopus, Bar-tailed Godwit Limosa lapponica, Western Sandpiper Cal-idris mauri and Long-tailed Skua Stercorarius longicaudus. Curlews and other larger bodied species commonly attack-mobbed predators together, whereas smaller bodied species generally gave alarm calls and circled the predators. For all species, the intensity of antipredator defence by attending adults gradually decreased as young became older and aggregations formed. We suggest that amalgamation of broods among Bristle-thighed Curlew enhances predator defence, aids in the process of flock formation for migrating young, and allows females and some males to desert their young earlier.

  20. 77 FR 20437 - Susan Harwood Training Grant Program, FY 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... availability of funds and solicitation for Grant Applications (SGA) for Targeted Topic Training, and Targeted Topic Training and Educational Materials Development Grants. Funding Opportunity No.: SHTG-FY-12-01...

  1. FY 2016 and FY 2017 Request for Proposals for the Source Reduction Assistance Grant Program

    EPA Pesticide Factsheets

    EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $2,200,000 will be available collectively.

  2. Brood size modifications affect plumage bacterial assemblages of European starlings.

    PubMed

    Lucas, Françoise S; Moureau, Benoit; Jourdie, Violaine; Heeb, Philipp

    2005-02-01

    During reproduction, birds face trade-offs between time and energy devoted to parental effort and traits associated with self-maintenance. We manipulated brood sizes to investigate the effects of such trade-offs on feather bacterial densities and the structure of bacterial assemblages on feathers in adult European starlings, Sturnus vulgaris, and in vitro feather degradation. As predicted by a trade-off between parental effort and self-maintenance, we found that birds with enlarged broods had more free-living bacteria on their feathers than birds with reduced broods. Furthermore, we found a significant interaction between brood manipulation and original brood size on free-living bacterial densities suggesting that the trade-off is mediated by the adults' initial reproductive investment. In contrast, brood size manipulations had no significant effect on densities of attached bacteria. Using ribosomal intergenic spacer analysis (RISA), we demonstrated that brood manipulations significantly modified the structure (band pattern) of feather-degrading bacterial assemblages, but had no significant effect on their richness (number of bands) or the in vitro feather degradation. In vitro feather degradation varied in relation to the premanipulation brood size and positively with the richness of the feather degrading bacterial community. Besides brood manipulation effect, we found that ecological factors and individual traits, such as the age, the nest location or the capture date, shaped bacterial assemblages and feather degradation capacities.

  3. Wood duck brood movements and habitat use on prairie rivers in South Dakota

    USGS Publications Warehouse

    Granfors, D.A.; Flake, Lester D.

    1999-01-01

    Wood duck (Aix sponsa) populations have been increasing in the Central Flyway, but little is known about wood duck brood rearing in prairie ecosystems. We compared movements and habitat use of radiomarked female wood ducks with broods in South Dakota on 2 rivers with contrasting prairie landscapes. The perennial Big Sioux River had a broad floodplain and riparian forest, whereas the intermittent Maple River had emergent vegetation along the river channel. Movements between nest sites and brood-rearing areas were longer on the Maple River than on the Big Sioux River (P = 0.02) and were among the longest reported for wood duck broods. Movements on the Big Sioux River were longer in 1992 (P = 0.01), when the floodplain was dry, than in 1993 or 1994. Before flooding occurred on the Big Sioux River, broods used semipermanent wetlands and tributaries outside the floodplain; thereafter, females selected forested wetlands along the river. Broods on the Maple River used emergent vegetation along the river channel throughout the study. Because median length of travel to brood-rearing areas was 2-3 km we recommend maintenance of brood-rearing habitat every 3-5 km along prairie rivers. Wildlife managers should encourage landowners to retain riparian vegetation along perennial rivers and emergent vegetation along intermittent streams to provide brood-rearing habitat during wet and dry cycles.

  4. Department of the Navy. FY 1994/FY 1995 Biennial Budget Estimates. Military Construction Program. FY 1994

    DTIC Science & Technology

    1992-01-01

    3 are severely deteriorated. The concrete deck and supporting wood -pile structure are nearing the end of their life cycle. Both piers are to be...PROPOSED CONSTRUCTION One-story building with concrete foundation walls, load bearing masonry walls, and concrete floors; roof with wood truss framing...concrete building addition; concrete foundation and slab on grade; wood truss roof; 750 KVA. 3 phase transformer; utilities; concrete and storm drain. 11

  5. The Marshall Space Flight Center KC-135 zero gravity test program for FY 1982

    NASA Technical Reports Server (NTRS)

    Shurney, R. E. (Editor)

    1983-01-01

    During FY-82, researchers and experimenters from Marshall Space Flight Center (MSFC) conducted 11 separate investigations during 26.3 hr of testing aboard the KC-135 zero-gravity aircraft, based at Ellington Air force Base, Texas. Although this represented fewer hours than initially projected, all experiment and test objectives were met or exceeded. This Technical Memorandum compiles all results achieved by MSFC users during FY-82, a year considered to be highly productive.

  6. FY 2000/FY 2001 Budget Estimates, Air National Guard, FY 2000 Military Construction Program, Justification Data Submitted to Congress.

    DTIC Science & Technology

    1999-02-01

    299 28 271 0 194 16 178 0 TOTAL OFFICER ENLISTED 948 120 828 954 89 865 12. RESERVE UNIT DATA UNIT DESIGNATION 156 Aircraft Generation...with oil/water separator, fire suppression (overhead wet pipe and underwing AFFF ), personnel breathing apparatus, fall protection system, and all...underwing AFFF ), and floor refmishing/restriping. The hangar shops and offices require relocation/renovation. Various utility systems need to be

  7. 2016 Los Alamos National Laboratory Hazardous Waste Minimization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzman, Sonja L.; English, Charles Joe

    Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, whichmore » is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less

  8. Customer Satisfaction Survey of Pacific Northwest National Laboratory's Technical Assistance Partners -- FY 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conger, Robin L.; Spanner, Gary E.

    2011-11-02

    The businesses that have utilized PNNL's Technology Assistance Program were sent a survey to solicit feedback about the program and to determine what, if any, outcomes resulted from the assistance provided. As part of its small business outreach, Pacific Northwest National Laboratory (PNNL) offers technology assistance to businesses with fewer than 500 employees throughout the nation and to businesses of any size in the 2 counties that contain the Hanford site. Upon request, up to 40 staff-hours of a researcher's time can be provided to address technology issues at no charge to the requesting firm. During FY 2011, PNNL completedmore » assistance for 54 firms. Topics of the technology assistance covered a broad range, including environment, energy, industrial processes, medical, materials, computers and software, and sensors. In FY 2011, PNNL's Technology Assistance Program (TAP) was funded by PNNL Overheads. Over the past 16 years, the Technology Assistance Program has received total funding of nearly $2.8 million from several federal and private sources.« less

  9. FY 1991 safety program status report

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In FY 1991, the NASA Safety Division continued efforts to enhance the quality and productivity of its safety oversight function. Recent initiatives set forth in areas such as training, risk management, safety assurance, operational safety, and safety information systems have matured into viable programs contributing to the safety and success of activities throughout the Agency. Efforts continued to develop a centralized intra-agency safety training program with establishment of the NASA Safety Training Center at the Johnson Space Center (JSC). The objective is to provide quality training for NASA employees and contractors on a broad range of safety-related topics. Courses developed by the Training Center will be presented at various NASA locations to minimize travel and reach the greatest number of people at the least cost. In FY 1991, as part of the ongoing efforts to enhance the total quality of NASA's safety work force, the Safety Training Center initiated development of a Certified Safety Professional review course. This course provides a comprehensive review of the skills and knowledge that well-rounded safety professionals must possess to qualify for professional certification. FY 1992 will see the course presented to NASA and contractor employees at all installations via the NASA Video Teleconference System.

  10. AV-8B Remanufacture Program as Part of the Audit of the Defense Acquisition Board Review Process - FY 1994

    DTIC Science & Technology

    1994-06-03

    wft*:¥A:ft:i:ft& OFFICE OF THE INSPECTOR GENERAL AV-8B REMANUFACTURE PROGRAM AS PART OF THE AUDIT OF THE DEFENSE ACQUISITION BOARD...Part of the Audit of the Defense Acquisition Board Review Process - FY 1994 B. DATE Report Downloaded From the Internet: 03/23/99 C. Report’s Point...NAVY FOR RESEARCH DEVELOPMENT AND ACQUISITION SUBJECT: Audit Report on the AV-8B Remanufacture Program as Part of the Audit of the Defense

  11. Electric and Hybrid Vehicles Program. Sixteenth annual report to Congress for fiscal year 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    This report describes the progress achieved in developing electric and hybrid vehicle technologies, beginning with highlights of recent accomplishments in FY 1992. Detailed descriptions are provided of program activities during FY 1992 in the areas of battery, fuel cell, and propulsion system development, and testing and evaluation of new technology in fleet site operations and in laboratories. This Annual Report also contains a status report on incentives and use of foreign components, as well as a list of publications resulting from the DOE program.

  12. Physics of the Cosmos Program Annual Technology Report

    NASA Technical Reports Server (NTRS)

    Pham, Bruce Thai; Cardiff, Ann H.

    2015-01-01

    What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .

  13. The Merida Initiative: Refuting the Need for a Military Hammer

    DTIC Science & Technology

    2012-03-08

    resulted in a package of U.S. assistance for Mexico and Central America beginning in FY 2008 and lasting through FY 2010. Dubbed the Merida Initiative...at- risk youth program (non-Merida) administered by international organizations working in the city [Ciudad Jaurez].”59 These two initiatives in...officers in the Department of Defense IMET funded programs of any Latin American country.”69 Department of Defense provides other opportunities in

  14. Ethanol annual report FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Texeira, R.H.; Goodman, B.J.

    This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.

  15. FY14 LLNL OMEGA Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Fournier, K. B.; Baker, K.

    In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID).more » The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less

  16. FY15 LLNL OMEGA Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Baker, K. L.; Barrios, M. A.

    In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drivemore » Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less

  17. Developing the science product algorithm testbed for Chinese next-generation geostationary meteorological satellites: Fengyun-4 series

    NASA Astrophysics Data System (ADS)

    Min, Min; Wu, Chunqiang; Li, Chuan; Liu, Hui; Xu, Na; Wu, Xiao; Chen, Lin; Wang, Fu; Sun, Fenglin; Qin, Danyu; Wang, Xi; Li, Bo; Zheng, Zhaojun; Cao, Guangzhen; Dong, Lixin

    2017-08-01

    Fengyun-4A (FY-4A), the first of the Chinese next-generation geostationary meteorological satellites, launched in 2016, offers several advances over the FY-2: more spectral bands, faster imaging, and infrared hyperspectral measurements. To support the major objective of developing the prototypes of FY-4 science algorithms, two science product algorithm testbeds for imagers and sounders have been developed by the scientists in the FY-4 Algorithm Working Group (AWG). Both testbeds, written in FORTRAN and C programming languages for Linux or UNIX systems, have been tested successfully by using Intel/g compilers. Some important FY-4 science products, including cloud mask, cloud properties, and temperature profiles, have been retrieved successfully through using a proxy imager, Himawari-8/Advanced Himawari Imager (AHI), and sounder data, obtained from the Atmospheric InfraRed Sounder, thus demonstrating their robustness. In addition, in early 2016, the FY-4 AWG was developed based on the imager testbed—a near real-time processing system for Himawari-8/AHI data for use by Chinese weather forecasters. Consequently, robust and flexible science product algorithm testbeds have provided essential and productive tools for popularizing FY-4 data and developing substantial improvements in FY-4 products.

  18. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for themore » Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.« less

  19. Evaluation of FY 1987 safety belt use law state enforcement grants

    DOT National Transportation Integrated Search

    1991-03-01

    The report presents information and an evaluation of safety belt use law enforcement grants provided to 17 states through supplemental 403 grants during FY 1987. Elmira-type programs were to serve as a model in order to demonstrate that basic enforce...

  20. Site Characterization and Monitoring Technical Support Center FY16 Report

    EPA Science Inventory

    SCMTSC’s primary goal is to provide technical assistance to regional programs on complex hazardous waste site characterization issues. This annual report illustrates the range and extent of projects that SCMTSC supported in FY 2016. Our principal audiences are site project manage...

  1. 78 FR 68825 - Strategic Environmental Research and Development Program, Scientific Advisory Board; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... (RC-2434)--FY14 Re-Brief, Dr. Jeffrey Foster, Northern Seed Dispersal Networks and Novel Arizona.... Sediments, and Biological Receptors. 1:25 p.m 14 ER03-025 (ER-2428)--FY14 New Start, Dr. Danny Reible, Texas...

  2. FY 2018 and FY 2019 Pollution Prevention Grant Program Request for Proposals

    EPA Pesticide Factsheets

    To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $4.69 million for the P2 Grant in 2018.

  3. Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report

    DOT National Transportation Integrated Search

    2013-03-01

    Argonne National Laboratory initiated a FY2006-FY2009 multi-year program with the US Department of Transportation (USDOT) on October 1, 2006, to establish the Transportation Research and Analysis Computing Center (TRACC). As part of the TRACC project...

  4. FY 2016 and FY 2017 Pollution Prevention Grant Program Request for Proposals

    EPA Pesticide Factsheets

    To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $3.97 million for the P2 Grant in 2016.

  5. Human Nutrition Research Conducted at State Agricultural Experiment Stations and 1890/Tuskegee Agricultural Research Programs.

    ERIC Educational Resources Information Center

    Driskell, Judy A.; Myers, John R.

    1989-01-01

    Cooperative State Research Service-administered and state-appropriated State Agriculture Experiment Station funds for human nutrition research increased about two-fold from FY70-FY86, while the percentage of budget expended for this research decreased. (JOW)

  6. The US DOE-EM International Program - 13004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)« less

  7. The US DOE EM international program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Roach, Jay A.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into the remainder of FY 2013 and beyond. (authors)« less

  8. Congress examines administration's coal research priorities

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2011-10-01

    While the Obama administration has proposed a shift in coal research funding to further emphasize carbon capture and sequestration (CCS) programs in its fiscal year (FY) 2012 budget request, Republicans and several witnesses at a 13 October hearing of a subcommittee of the House of Representatives' Committee on Science, Space, and Technology questioned those priorities, called for additional federal funding for coal research, and defended the use of coal as a major part of the U.S. energy sector. The administration's FY 2012 budget requests 291.4 million to fund the Department of Energy's (DOE) CCS and power systems program while zeroing out funding for DOE's fuels and power systems program (which includes funding for coal research) and shifting some of its line items to the CCS program. The FY 2011 continuing resolution has funded the fuels and power systems program at 400.2 million, including 142 million for carbon sequestration, 64.8 million for innovations for existing plants, and funding for other subprograms such as advanced integrated gasification combined cycle (52.9 million), fuel cells (49.8 million), and advanced research ($47.6 million).

  9. Integrated modeling of advanced optical systems

    NASA Astrophysics Data System (ADS)

    Briggs, Hugh C.; Needels, Laura; Levine, B. Martin

    1993-02-01

    This poster session paper describes an integrated modeling and analysis capability being developed at JPL under funding provided by the JPL Director's Discretionary Fund and the JPL Control/Structure Interaction Program (CSI). The posters briefly summarize the program capabilities and illustrate them with an example problem. The computer programs developed under this effort will provide an unprecedented capability for integrated modeling and design of high performance optical spacecraft. The engineering disciplines supported include structural dynamics, controls, optics and thermodynamics. Such tools are needed in order to evaluate the end-to-end system performance of spacecraft such as OSI, POINTS, and SMMM. This paper illustrates the proof-of-concept tools that have been developed to establish the technology requirements and demonstrate the new features of integrated modeling and design. The current program also includes implementation of a prototype tool based upon the CAESY environment being developed under the NASA Guidance and Control Research and Technology Computational Controls Program. This prototype will be available late in FY-92. The development plan proposes a major software production effort to fabricate, deliver, support and maintain a national-class tool from FY-93 through FY-95.

  10. Movements and habitat use of mallard broods in northeastern California

    USGS Publications Warehouse

    Mauser, D.M.; Jarvis, R.L.; Gilmer, D.S.

    1994-01-01

    To increase recruitment of mallards (Anas platyrhynchos), wildlife managers must understand the habitat and space needs of mallard broods. During 1989-90, we examined the movements, home range, and habitat use of 27 radio-marked mallard broods on Lower Klamath National Wildlife Refuge, California. Twelve of the 27 broods made 22 relocation movements (>1,000 m in 24 hr) in the first week (n = 6) and after the fourth (n = 16) week of life. Mean home range size was 0.93 km2 (SE = 0.25) and did not differ between years (P = 0.26). Brood-rearing females selected seasonally flooded wetlands with a cover component and avoided open or permanently flooded habitats. In 1989, broods hatched in permanent wetlands were less successful in fledging (P = 0.006) radio-marked ducklings than broods from seasonal wetlands, suggesting habitat availability or movement to preferred habitats may affect duckling survival.

  11. Variation in body mass of wild canvasback and redhead ducklings

    USGS Publications Warehouse

    Austin, Jane E.; Serie, Jerome R.

    1994-01-01

    We assessed variation in body mass of ducklings in single- and mixed-species broods of wild Canvasbacks (Aythya valisineria) and Redheads (Aythya americana) 20-50 days old. Body mass of canvasback ducklings was not affected by year and season (early vs. late hatch date) despite changes in water conditions. Mean body mass of male and female Canvasbacks did not differ in Class IIA but did differ in older age classes. Within-brood differences in body mass tended to be higher in Class IIA ducklings (6-7% of mean body mass for Canvasbacks, 9-11% in Redheads) and generally declined to 4-6% in Class IIC and older ducklings. Some within-brood differences were as high as 20-30% of mean body mass. Tests to assess sources of within-brood variation (age, sex, and season) in body mass for Canvasbacks were inconclusive. Variation within broods was generally less than that among broods for both Canvasbacks and Redheads. The lack of differences in duckling body mass between single- and mixed-species broods for any age class, sex, or species suggests that mass was not affected by interspecific brood parasitism.

  12. Hygienic behavior in the stingless bees Melipona beecheii and Scaptotrigona pectoralis (Hymenoptera: Meliponini).

    PubMed

    Medina, L M; Hart, A G; Ratnieks, F L W

    2009-05-19

    Hygienic behavior, a trait that may confer resistance to brood diseases in the honey bee Apis mellifera, was studied in two species of stingless bees in Mexico. Eight colonies each of Melipona beecheii and Scaptotrigona pectoralis were tested for hygienic behavior, the removal of dead or diseased brood, by freeze killing a comb of sealed cells containing pupae. Both species detected and removed dead brood. However, removal rates differed between species. In M. beecheii colonies, workers took 2-9 days to remove 100% of the dead brood (4.4 +/- 2.0 days, mean +/- SD), while S. pectoralis removed all dead brood in less than 3 days (2.3 +/- 0.6 days, mean +/- SD). We conclude that hygienic behavior is not unique to A. mellifera, and is not solely an adaptation for the reuse of brood cells as occurs in honey bees but not stingless bees. Although stingless bees do not reuse brood cells, space is limited. The removal of dead brood may be necessary to allow new cells to be constructed in the same place.

  13. Aggressive behavior of the male parent predicts brood sex ratio in a songbird

    NASA Astrophysics Data System (ADS)

    Szász, Eszter; Garamszegi, László Zsolt; Hegyi, Gergely; Szöllősi, Eszter; Markó, Gábor; Török, János; Rosivall, Balázs

    2014-08-01

    Brood sex ratio is often affected by parental or environmental quality, presumably in an adaptive manner that is the sex that confers higher fitness benefits to the mother is overproduced. So far, studies on the role of parental quality have focused on parental morphology and attractiveness. However, another aspect, the partner's behavioral characteristics, may also be expected to play a role in brood sex ratio adjustment. To test this hypothesis, we investigated whether the proportion of sons in the brood is predicted by the level of territorial aggression displayed by the father, in the collared flycatcher ( Ficedula albicollis). The proportion of sons in the brood was higher in early broods and increased with paternal tarsus length. When controlling for breeding date and body size, we found a higher proportion of sons in the brood of less aggressive fathers. Male nestlings are more sensitive to the rearing environment, and the behavior of courting males may often be used by females to assess their future parental activity. Therefore, adjusting brood sex ratio to the level of male aggression could be adaptive. Our results indicate that the behavior of the partner could indeed be a significant determinant in brood sex ratio adjustment, which should not be overlooked in future studies.

  14. Stingless bees (Melipona subnitida) adjust brood production rather than foraging activity in response to changes in pollen stores.

    PubMed

    Maia-Silva, Camila; Hrncir, Michael; Imperatriz-Fonseca, Vera Lucia; Schorkopf, Dirk Louis P

    2016-10-01

    Highly eusocial bees (honey bees and stingless bees) sustain their colonies through periods of resource scarcity by food stored within the nest. The protein supply necessary for successful brood production is ensured through adjustments of the colonies' pollen foraging according to the availability of this resource in the environment. In honey bees Apis mellifera, in addition, pollen foraging is regulated through the broods' demand for this resource. Here, we investigated the influence of the colony's pollen store level on pollen foraging and brood production in stingless bees (Melipona subnitida). When pollen was added to the nests, colonies increased their brood production and reduced their pollen foraging within 24 h. On the other hand, when pollen reserves were removed, colonies significantly reduced their brood production. In strong contrast to A. mellifera; however, M. subnitida did not significantly increase its pollen foraging activity under poor pollen store conditions. This difference concerning the regulation of pollen foraging may be due to differences regarding the mechanism of brood provisioning. Honey bees progressively feed young larvae and, consequently, require a constant pollen supply. Stingless bees, by contrast, mass-provision their brood cells and temporary absence of pollen storage will not immediately result in substantial brood loss.

  15. Competition with a host nestling for parental provisioning imposes recoverable costs on parasitic cuckoo chick's growth.

    PubMed

    Geltsch, Nikoletta; Hauber, Márk E; Anderson, Michael G; Bán, Miklós; Moskát, Csaba

    2012-07-01

    Chicks of the brood parasitic common cuckoo (Cuculus canorus) typically monopolize host parental care by evicting all eggs and nestmates from the nest. To assess the benefits of parasitic eviction behaviour throughout the full nestling period, we generated mixed broods of one cuckoo and one great reed warbler (Acrocephalus arundinaceus) to study how hosts divide care between own and parasitic young. We also recorded parental provisioning behaviour at nests of singleton host nestlings or singleton cuckoo chicks. Host parents fed the three types of broods with similar-sized food items. The mass of the cuckoo chicks was significantly reduced in mixed broods relative to singleton cuckoos. Yet, after the host chick fledged from mixed broods, at about 10-12 days, cuckoo chicks in mixed broods grew faster and appeared to have compensated for the growth costs of prior cohabitation by fledging at similar weights and ages compared to singleton cuckoo chicks. These results are contrary to suggestions that chick competition in mixed broods of cuckoos and hosts causes an irrecoverable cost for the developing brood parasite. Flexibility in cuckoos' growth dynamics may provide a general benefit to ecological uncertainty regarding the realized successes, failures, and costs of nestmate eviction strategies of brood parasites. Copyright © 2012 Elsevier B.V. All rights reserved.

  16. Biological and Chemical Technologies Research at OIT: Annual Summary Report, FY 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, G.

    1998-03-01

    The annual summary report presents the fiscal year (FY) 1 997 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program. This BCTR program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1997 (ASR 97) contains the following: program description (including BCTR program mission statement, historical background, relevance, goals and objectives); program structure and organization; selected technical and programmatic highlights for 1 997; detailed descriptions of individual projects; and a listing of program output, including amore » bibliography of published work, patents, and awards arising from work supported by the program.« less

  17. Workload Trend Analysis for the Military Graduate Medical Education Program in San Antonio

    DTIC Science & Technology

    2005-05-25

    Procedures 57 Introduction and Methodology 57 Results and Discussion 58 Craniotomy 61 Introduction and Methodology 61 Results and Discussion 62...distribution of major vascular procedures by age group for FY 00-04 36. WHMC and BAMC craniotomies for FY 00-04 by age group 37. WHMC and BAMC FY 00-04...average craniotomies by age group compared to required average based on RRC requirement 38. WHMC and BAMC distribution of craniotomies by age group for

  18. Coalition Warfare Program Presentation to: 2009 EUCOM/AFRICOM Science and Technology Conference

    DTIC Science & Technology

    2009-06-01

    compac an nexpens ve m cro- fluxgate magnetometer for use in multiple COCOMs. To continue T&E with joint services and apply lessons learned to...Partners in EUCOM/AFRICOM FY08 Starts • Advanced Dynamic Magnetometer FY09 Starts • ADNS Coalition Network FY10 New Starts • Clip-on Night Vision...Partner 2008 New Starts Advanced Dynamic Magnetometer for Static and Moving Applications T d l t d i i i US Navy (SPAWAR) Italy, Sweden o eve op a a

  19. Boundary Control Systems, Assessment Remedial Investigation, Version 2. 1. Volume 1

    DTIC Science & Technology

    1988-12-01

    ALLUVIAL WELLS CALCULATED TRANSMISSIVITY VALUES. AND ALLUVIAL WELLS MONITORED. . FOR WATER LEVELS FY87 A.? WELL SITING RATIONALE 10 A-3 WELL COMPLETION...29 Contour Map of Transmissivity of the Alluvial Aquifer 3rd Quarter FY 1987 B-30 Potentiometric Surface, Denver Formation Sand Zone 4 3rd Quarter FY...Monitoring 2-10 2.2-2 Chemical Analysis - Task 25 Anal-tical Program ;-14 4.1-1 Transmissivity (T), Hydraulic Conductivity (K), and 4-12 Apparent Specific

  20. U.S. Marine Corps FY 82 Exploratory Development Program.

    DTIC Science & Technology

    1982-01-25

    1. It is requested that the cover of the reference be pen changed to reflect "FY 82" vice "FY 81". DISTRIBUTION: By direction (see attached pages) i4...Falls Church, VA 22041 3 Marine Corps Liaison Officer Naval Weapons Center China Lake, CA 93555 Marine Corps Liaison Officer HQ MASSTER Ft. Hood, TX...Center, Hawaii Lab P. 0. Box 997 Kaihua, Hawaii 96734 Mr. Paul H. Amundson Code 3304 Naval Weapons Center China Lake, CA 93555 Naval Surface Weapons

  1. Geophysics Funding Healthy in FY 1986 Federal Budget

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.; Robb, David W.

    Continued support for many geophysics projects is part of the fiscal year (FY) 1986 budget proposal that President Ronald Reagan sent to Congress earlier this month. Unlike many other programs that took deep cuts or were eliminated, overall funding for science held steady in the proposed budget. This budget proposal, however, did not offer the large increases that had been proposed for FY 1985 (Eos, February 14, 1984, p. 49). Figure 1 shows the trend for science outlays during the past several years.

  2. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    DTIC Science & Technology

    1989-01-01

    size, weight , power consumption, and radiation hardness, and on software algorithm validity and efficiency. 3. (U) Collection of radar, ctical, and...which have potential to achieve cooling requirements for LWIR sensors with far smaller weight and power penalties. (U) FY1989 Planned Program: o (U...two dollars for every SDI dollar. o (U) Inverted gaili--n arsenide by growing a razor-thin layer of silicon on GaAs and thus cut power loss by two

  3. Guide to the NITRD Program FY 2004-FY 2005. Supplement to the President’s Budget for FY 2005

    DTIC Science & Technology

    2004-12-01

    electronic medical records systems . At the core of such systems is the concept of a secure, patient-centered electronic health record ( EHR ) that: 1...support the development of an NHII that includes an Electronic Health Record System ( EHRS ). The EHRS will be a longitudinal collection of electronic... health information for and about persons. It will allow electronic access to person- and population-level information by authorized users. The system

  4. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  5. 75 FR 60715 - Domestic Sugar Program-FY 2010 and FY 2011 Cane Sugar and Beet Sugar Marketing Allotments and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...,716 Hawaii Gay & Robinson, Inc 72,401 -18,673 -50,592 3,136 Hawaiian Commercial & Sugar Company... & Sons 495,489 Total Louisiana 1,620,472 Texas: Rio Grande Valley 182,094 Hawaii: Gay & Robinson, Inc 73...

  6. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2009-04-03

    resources in a few low- and low- middle income countries that have demonstrated a strong commitment to political, economic, and social reforms. The...several other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian

  7. Research administration, state planning & research part II program : FY2012 at-a-glance.

    DOT National Transportation Integrated Search

    2012-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2012. The tables on pages 2 through 7 list all MDOT-funded research projects by focus area that were active or completed during 2...

  8. Research administration, state planning & research part II program : FY2013 at-a-glance.

    DOT National Transportation Integrated Search

    2014-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year : (FY) 2013. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active : or completed duri...

  9. 75 FR 11841 - Repowering Assistance Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... application window. SUMMARY: RBS is announcing a new application window to submit applications for the...-time application window for remaining FY 2009 funds. Paperwork Reduction Act In accordance with the... allocate all of the FY 2009 authorized funds. Therefore, the Agency is opening a new application window to...

  10. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    DOT National Transportation Integrated Search

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  11. Management of bacterial kidney disease in Chinook Salmon hatcheries based on broodstock testing by enzyme-linked immunosorbent assay: A multiyear study

    USGS Publications Warehouse

    Munson, A. Douglas; Elliott, Diane G.; Johnson, Keith

    2010-01-01

    From the mid-1980s through the early 1990s, outbreaks of bacterial kidney disease (BKD) caused by Renibacterium salmoninarum continued in Chinook salmon Oncorhynchus tshawytscha in Idaho Department of Fish and Game (IDFG) hatcheries despite the use of three control methods: (1) injection of returning adult fish with erythromycin to reduce prespawning BKD mortality and limit vertical transmission of R. salmoninarum, (2) topical disinfection of green eggs with iodophor, and (3) prophylactic treatments of juvenile fish with erythromycin-medicated feed. In addition, programs to manage BKD through measurement of R. salmoninarum antigen levels in kidney tissues from spawning female Chinook salmon by an enzyme-linked immunosorbent assay (ELISA) were tested over 13–15 brood years at three IDFG hatcheries. The ELISA results were used for either (1) segregated rearing of progeny from females with high ELISA optical density (OD) values (usually ≥0.25), which are indicative of high R. salmoninarum antigen levels, or (2) culling of eggs from females with high ELISA OD values. The ELISA-based culling program had the most profound positive effects on the study populations. Mortality of juvenile fish during rearing was significantly lower at each hatchery for brood years derived from culling compared with brood years for which culling was not practiced. The prevalence of R. salmoninarum in juvenile fish, as evidenced by detection of the bacterium in kidney smears by the direct fluorescent antibody test, also decreased significantly at each hatchery. In addition, the proportions of returning adult females with kidney ELISA OD values of 0.25 or more decreased 56–85% for fish reared in brood years during which culling was practiced, whereas the proportions of ELISA-negative adults increased 55–58%. This management strategy may allow IDFG Chinook salmon hatcheries to reduce or eliminate prophylactic erythromycin-medicated feed treatments. We recommend using ELISA-based management of BKD in Chinook salmon hatcheries where it is a concern.

  12. Influences on the Timing and Frequency of Cancellations and Truncations of Major Defense Acquisition Programs

    DTIC Science & Technology

    2017-03-01

    the start of the bust phase following the Carter-Reagan boom. From peak procurement Budget Authority of $183.9 billion (FY 2017 dollars) in FY 1985...to close a funding gap involves choices among bad alternatives—cancellations, delays in new starts , stretches of existing programs, acceptance of...less capable alternatives in some cases, and adoption of very optimistic costing and programmatic decisions for both new starts and—to the extent

  13. NASA Occupational Health Program FY98 Self-Assessment

    NASA Technical Reports Server (NTRS)

    Brisbin, Steven G.

    1999-01-01

    The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2011. The associated FY 2011 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2010. The associated FY 2010 ORNL LDRD Self-Assessment (ORNL/PPA-2011/2) provides financial datamore » and an internal evaluation of the program’s management process.« less

  16. Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017.

    PubMed

    Watson, Crystal R; Watson, Matthew; Sell, Tara Kirk

    2017-09-01

    To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained.

  17. Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017

    PubMed Central

    Sell, Tara Kirk

    2017-01-01

    Objectives. To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. Methods. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. Results. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. Conclusions. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained. PMID:28892451

  18. Examination of the Open Market Corridor

    DTIC Science & Technology

    2003-12-01

    105 D. BENEFITS OF THE PURCHASE CARD PROGRAM ..........................107 1. List of Benefits ...107 2. Additional Benefits and How OMC Can Increase the Benefits ...107 E. WEAKNESSES OF...software licenses and support services. Estimated life-cycle costs for FY 1995 through FY 2005 are $3.7 billion. Operational benefits from SPS are

  19. 75 FR 37873 - Notice of Funding Availability for the Department of Transportation's National Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... Investments Under the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act... grant program under the FY 2010 Appropriations Act. The DOT is referring to the grants for National... FY 2010 Appropriations Act, the DOT will evaluate all applications and announce the projects that...

  20. 45 CFR 305.42 - Penalty phase-in.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM PERFORMANCE MEASURES, STANDARDS, FINANCIAL INCENTIVES, AND PENALTIES § 305.42 Penalty phase-in. States are subject to the performance penalties described in § 305.40 based on data reported for FY 2001. Data reported for FY 2000 will be used as a base year to determine improvements in performance during...

  1. Colorado Children's Budget 2012

    ERIC Educational Resources Information Center

    Buck, Beverly; Cuciti, Peggy L.; Baker, Robin

    2012-01-01

    The "Colorado Children's Budget 2012" examines the state's commitment to investing in the well-being of children. It tallies up Colorado's actual and planned investment during the past five years (Fiscal Year (FY) 2008-2009 through FY 2012-2013) on programs and services in four areas: Early Childhood Learning and Development, K-12…

  2. Colorado Children's Budget 2011

    ERIC Educational Resources Information Center

    Colorado Children's Campaign, 2011

    2011-01-01

    "Colorado Children's Budget 2011" tallies up Colorado's public investments during FY 2007-08 through FY 2011-12 for programs and services that enhance the well-being of children across four domains--Early Childhood, K-12 Education, Health, and Other Supports. It is intended to be a resource guide for policymakers and advocates who are…

  3. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2007

    DOT National Transportation Integrated Search

    2012-09-30

    In FY 2007, Federal and State enforcement personnel conducted more than 15,000 CRs on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers will impro...

  4. U.S. Army Research Institute Program in Basic Research FY 2005 and FY 2006

    DTIC Science & Technology

    2007-11-01

    designed to tap different levels of processing-from visual attention (measured via eye-tracking) and interpretation through memory and decision-making (e.g...Test ( EFT ; Witkin, 1950; Witkin, Dyk, Faterson, Goodenough, & Karp, 1962) modified for group administration. It measures competence in perceptual field

  5. Space directorate research and technology accomplishments for FY 1988

    NASA Technical Reports Server (NTRS)

    Avery, Don E. (Compiler)

    1989-01-01

    The major accomplishments and test highlights for FY 1988 that occurred in the Space Dirctorate are given. Accomplishments and test highlights are presented by Division and Branch. The presented information will be useful in program coordination with government organizations, universities, and industry in areas of mutual interest.

  6. Military Manpower Training Report for FY 1976.

    ERIC Educational Resources Information Center

    Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.

    The document presents anticipated needs and costs for training military personnel in FY 1976, based on national security objectives. Training loads for each of the following categories are presented with supporting tables: (1) recruit training, (2) officer acquisition training, (3) specialized skill training, (4) flight training programs, and (5)…

  7. 75 FR 66773 - Notice of Proposed Information Collection for Public Comment; FY 2010 Capital Fund Community and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... early childhood education, adult education, and/or job training programs for public housing residents... Information Collection for Public Comment; FY 2010 Capital Fund Community and Education Training Facilities... 2010 Capital Fund Community and Education Training Facilities NOFA. OMB Control Number: 2577-0268...

  8. Intelligent Vehicle Mobility M&S Capability Development (FY13 innovation Project) (Briefing Charts)

    DTIC Science & Technology

    2014-05-19

    Intelligent Vehicle Mobility M&S Capability Development (FY13 Innovation Project) P. Jayakumar and J. Raymond, Analytics 19 May 2014...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Paramsithy Jayakumar ; J Raymond 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING

  9. Prolactin stress response does not predict brood desertion in a polyandrous shorebird.

    PubMed

    Kosztolányi, András; Küpper, Clemens; Chastel, Olivier; Parenteau, Charline; Yılmaz, K Tuluhan; Miklósi, Adám; Székely, Tamás; Lendvai, Adám Z

    2012-05-01

    One of the fundamental principles of the life-history theory is that parents need to balance their resources between current and future offspring. Deserting the dependent young is a radical life-history decision that saves resources for future reproduction but that may cause the current brood to fail. Despite the importance of desertion for reproductive success, and thus fitness, the neuroendocrine mechanisms of brood desertion are largely unknown. We investigated two candidate hormones that may influence brood desertion in the Kentish plover Charadrius alexandrinus: prolactin ('parental hormone') and corticosterone ('stress hormone'). Kentish plovers exhibit an unusually diverse mating and parental care system: brood desertion occurs naturally since either parent (the male or the female) may desert the brood after the chicks hatch and mate with a new partner shortly after. We measured the hormone levels of parents at hatching using the standard capture and restraint protocol. We subsequently followed the broods to determine whether a parent deserted the chicks. We found no evidence that either baseline or stress-induced prolactin levels of male or female parents predicted brood desertion. Although stress-induced corticosterone levels were generally higher in females compared with males, individual corticosterone levels did not explain the probability of brood desertion. We suggest that, in this species, low prolactin levels do not trigger brood desertion. In general, we propose that the prolactin stress response does not reflect overall parental investment in a species where different parts of the breeding cycle are characterized by contrasting individual investment strategies. Copyright © 2012 Elsevier Inc. All rights reserved.

  10. Eider females form non-kin brood-rearing coalitions

    USGS Publications Warehouse

    Ost, M.; Vitikainen, E.; Waldeck, P.; Sundstrom, L.; Lindstrom, K.; Hollmen, Tuula E.; Franson, J.C.; Kilpi, Mikael

    2005-01-01

    Kin selection is a powerful tool for understanding cooperation among individuals, yet its role as the sole explanation of cooperative societies has recently been challenged on empirical grounds. These studies suggest that direct benefits of cooperation are often overlooked, and that partner choice may be a widespread mechanism of cooperation. Female eider ducks (Somateria mollissima) may rear broods alone, or they may pool their broods and share brood-rearing. Females are philopatric, and it has been suggested that colonies may largely consist of related females, which could promote interactions among relatives. Alternatively, shared brood care could be random with respect to relatedness, either because brood amalgamations are accidental and nonadaptive, or through group augmentation, assuming that the fitness of all group members increases with group size. We tested these alternatives by measuring the relatedness of co-tending eider females in enduring coalitions with microsatellite markers. Females formed enduring brood-rearing coalitions with each other at random with respect to relatedness. However, based on previous data, partner choice is nonrandom and dependent on female body condition. We discuss potential mechanisms underlying eider communal brood-rearing decisions, which may be driven by the specific ecological conditions under which sociality has evolved in this species.

  11. Microgravity science and applications: Program tasks and bibliography for FY 1992

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This report is a compilation of the FY 1992 Principal Investigator program task descriptions funded by the Microgravity Science and Applications Division (MSAD), NASA Headquarters, Washington, DC. The document also provides a bibliography of FY 1992 publications and presentations cited by MSAD Principal Investigators, and an index of the Principal Investigators and their affiliations. The purpose of the document is to provide an overview and progress report for the funded tasks for scientists and researchers in industry, university, and government communities. The tasks are grouped into three categories appropriate to the type of research being done-space flight, ground based, and advanced technology development-and by science discipline. The science disciplines are: biotechnology, combustion science,, electronic materials, fluid physics, fundamental physics, glass and ceramics, metals and alloys, and protein crystal growth.

  12. FY2017 Electrification Annual Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance Electric Motors and Power Electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance Grid Modernization and Electric Vehicle Charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Eachmore » of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2017.« less

  13. Woodcock brood ecology in Maine

    USGS Publications Warehouse

    Dwyer, T.J.; Derleth, E.L.; McAuley, D.G.

    1982-01-01

    Captures of 102 American woodcock (Philohela minor) broods, including 338 chicks, from 1977 to 1980 provided data on age-related production by breeding females and on growth and survival of chicks. Although broods of second-year females are smaller and hatch at slightly later dates and the growth of the chicks is slower than that of broods of after-second-year hens, we could detect no difference in survival of the chicks. Yearly variation in the sex ratio of fledged young was probably the result of selection for or against larger female chicks during different environmental conditions. Broodmates associate with each other throughout the summer, and there are differences in habitat preferences between young (1-5 days old) and older (> 5 days old) broods. Older broods prefer more open, mature forest stands with fewer trees per hectare.

  14. Hot spots in the bee hive

    NASA Astrophysics Data System (ADS)

    Bujok, Brigitte; Kleinhenz, Marco; Fuchs, Stefan; Tautz, Jürgen

    2002-06-01

    Honeybee colonies (Apis mellifera) maintain temperatures of 35-36°C in their brood nest because the brood needs high and constant temperature conditions for optimal development. We show that incubation of the brood at the level of individual honeybees is done by worker bees performing a particular and not yet specified behaviour: such bees raise the brood temperature by pressing their warm thoraces firmly onto caps under which the pupae develop. The bees stay motionless in a characteristic posture and have significantly higher thoracic temperatures than bees not assuming this posture in the brood area. The surface of the brood caps against which warm bees had pressed their thorax were up to 3.2°C warmer than the surrounding area, confirming that effective thermal transfer had taken place.

  15. ARIES Oxide Production Program Assessment of Risk to Long-term Sustainable Production Rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitworth, Julia; Lloyd, Jane Alexandria; Majors, Harry W.

    2017-05-04

    This report describes an assessment of risks and the development of a risk watch list for the ARIES Oxide Production Program conducted in the Plutonium Facility at LANL. The watch list is an active list of potential risks and opportunities that the management team periodically considers to maximize the likelihood of program success. The initial assessments were made in FY 16. The initial watch list was reviewed in September 2016. The initial report was not issued. Revision 1 has been developed based on management review of the original watch list and includes changes that occurred during FY-16.

  16. Inspector General, DOD, Oversight of the Army Audit Agency Audit of the FY 1999 U.S. Army Corps of Engineers, Civil Works Program, Financial Statements

    DTIC Science & Technology

    2000-02-28

    iIÄ»lllilil^» P «lMlii fport INSPECTOR GENERAL, DOD, OVERSIGHT OF THE ARMY AUDIT AGENCY AUDIT OF THE FY 1999 U.S. ARMY CORPS OF ENGINEERS, CIVIL...WORKS PROGRAM, FINANCIAL STATEMENTS Report No. D -2000-093 February 28, 2000 pnc QXIAUTY mm®™* i 0ffice Qf ±Q hispdCtor General Department of...Works Program, Financial Statements (Report No. D -2000-093) We are providing this audit report for your information and use and for transmittal to

  17. Fact Sheet: Selected Highlights of the FY2017 National Defense Authorization Act (H.R. 4909)

    DTIC Science & Technology

    2016-05-12

    shaped by the legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74...of Defense (DOD) funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is exempt from that spending cap because it is classified as...funding for so- called Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations

  18. Strategic Environmental Research & Development Program (SERDP): Phase I and Phase II Strategic Investment Plans FY 1992 and Interim Status Report of the Council.

    DTIC Science & Technology

    1993-10-01

    VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the

  19. Building America Systems Integration Research Annual Report. FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gestwick, Michael

    2013-05-01

    This Building America FY2012 Annual Report includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  20. NASA agenda for tomorrow

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Key elements of national policy, NASA goals and objectives, and other materials that comprise the framework for NASA planning are included. The contents are expressed as they existed through much of 1988; thus they describe the strategic context employed by NASA in planning both the FY 1989 program just underway and the proposed FY 1990 program. NASA planning will continue to evolve in response to national policy requirements, a changing environment, and new opportunities. Agenda for Tomorrow provides a status report as of the time of its publication.

  1. Northern bobwhite breeding season ecology on a reclaimed surface mine

    USGS Publications Warehouse

    Brooke, Jarred M.; Tanner, Evan P.; Peters, David C.; Tanner, Ashley M.; Harper, Craig A.; Keyser, Patrick D.; Clark, Joseph D.; Morgan, John J.

    2017-01-01

    Surface coal mining and subsequent reclamation of surface mines have converted large forest areas into early successional vegetative communities in the eastern United States. This reclamation can provide a novel opportunity to conserve northern bobwhite (Colinus virginianus). We evaluated the influence of habitat management activities on nest survival, nest-site selection, and brood resource selection on managed and unmanaged units of a reclaimed surface mine, Peabody Wildlife Management Area (Peabody), in west-central Kentucky, USA, from 2010 to 2013. We compared resource selection, using discrete-choice analysis, and nest survival, using the nest survival model in Program MARK, between managed and unmanaged units of Peabody at 2 spatial scales: the composition and configuration of vegetation types (i.e., macrohabitat) and vegetation characteristics at nest sites and brood locations (i.e., microhabitat). On managed sites, we also investigated resource selection relative to a number of different treatments (e.g., herbicide, disking, prescribed fire). We found no evidence that nest-site selection was influenced by macrohabitat variables, but bobwhite selected nest sites in areas with greater litter depth than was available at random sites. On managed units, bobwhite were more likely to nest where herbicide was applied to reduce sericea lespedeza (Lespedeza cuneata) compared with areas untreated with herbicide. Daily nest survival was not influenced by habitat characteristics or by habitat management but was influenced by nest age and the interaction of nest initiation date and nest age. Daily nest survival was greater for older nests occurring early in the breeding season (0.99, SE < 0.01) but was lower for older nests occurring later in the season (0.08, SE = 0.13). Brood resource selection was not influenced by macrohabitat or microhabitat variables we measured, but broods on managed units selected areas treated with herbicide to control sericea lespedeza and were located closer to firebreaks and disked native-warm season grass stands than would be expected at random. Our results suggest the vegetation at Peabody was sufficient without manipulation to support nesting and brood-rearing northern bobwhite at a low level, but habitat management practices improved vegetation for nesting and brood-rearing resource selection. Reproductive rates (e.g., nest survival and re-nesting rates) at Peabody were lower than reported in other studies, which may be related to nutritional deficiencies caused by the abundance of sericea lespedeza. On reclaimed mine lands dominated by sericea lespedeza, we suggest continuing practices such as disking and herbicide application that are targeted at reducing sericea lespedeza to improve the vegetation for nesting and brood-rearing bobwhite.

  2. Billions for biodefense: federal agency biodefense funding, FY2009-FY2010.

    PubMed

    Franco, Crystal

    2009-09-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through 2009. This article updates those figures with budgeted amounts for FY2010, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, and State; the Environmental Protection Agency; and the National Science Foundation. This year's article also provides an assessment of the proportion of the biodefense budget that serves multiple programmatic goals and benefits, including research into infectious disease pathogenesis and immunology, public health planning and preparedness, and disaster response efforts. The FY2010 federal budget for civilian biodefense totals $6.05 billion. Of that total, $4.96 billion is budgeted for programs that serve multiple goals and provide manifold benefits.

  3. FY16 LLNL Omega Experimental Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heeter, R. F.; Ali, S. J.; Benstead, J.

    In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112more » EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.« less

  4. Sub-lethal effects of pesticide residues in brood comb on worker honey bee (Apis mellifera) development and longevity.

    PubMed

    Wu, Judy Y; Anelli, Carol M; Sheppard, Walter S

    2011-02-23

    Numerous surveys reveal high levels of pesticide residue contamination in honey bee comb. We conducted studies to examine possible direct and indirect effects of pesticide exposure from contaminated brood comb on developing worker bees and adult worker lifespan. Worker bees were reared in brood comb containing high levels of known pesticide residues (treatment) or in relatively uncontaminated brood comb (control). Delayed development was observed in bees reared in treatment combs containing high levels of pesticides particularly in the early stages (day 4 and 8) of worker bee development. Adult longevity was reduced by 4 days in bees exposed to pesticide residues in contaminated brood comb during development. Pesticide residue migration from comb containing high pesticide residues caused contamination of control comb after multiple brood cycles and provided insight on how quickly residues move through wax. Higher brood mortality and delayed adult emergence occurred after multiple brood cycles in contaminated control combs. In contrast, survivability increased in bees reared in treatment comb after multiple brood cycles when pesticide residues had been reduced in treatment combs due to residue migration into uncontaminated control combs, supporting comb replacement efforts. Chemical analysis after the experiment confirmed the migration of pesticide residues from treatment combs into previously uncontaminated control comb. This study is the first to demonstrate sub-lethal effects on worker honey bees from pesticide residue exposure from contaminated brood comb. Sub-lethal effects, including delayed larval development and adult emergence or shortened adult longevity, can have indirect effects on the colony such as premature shifts in hive roles and foraging activity. In addition, longer development time for bees may provide a reproductive advantage for parasitic Varroa destructor mites. The impact of delayed development in bees on Varroa mite fecundity should be examined further.

  5. Experimental dissociation of individual quality, food and timing of breeding effects on double-brooding in a migratory songbird.

    PubMed

    O'Brien, Erin L; Dawson, Russell D

    2013-07-01

    Annual reproductive success in many species is influenced by the number of breeding attempts within a season. Although previous studies have shown isolated effects of female quality, food, and timing of breeding on the probability of female birds producing second broods, to our knowledge, none have tested the relative importance of multiple factors and their interactions using simultaneous manipulations within populations of free-living birds. In this study, we show that individual quality and timing of breeding interact to affect the probability of double-brooding in female mountain bluebirds (Sialia currucoides). High-quality females (those that naturally initiated clutches early in the season) were more likely to double-brood, regardless of whether their hatching date was advanced or delayed, whereas later breeding, lower quality females were much less likely to double-brood when their first attempt was delayed. This indicates that annual fecundity of poorer quality (or younger) female bluebirds may be more sensitive to seasonal variation in environmental conditions. In addition, birds that were provided with supplemental food throughout first breeding attempts were more likely to double-brood in one of the study years, suggesting that female bluebirds may be energetically limited in their capacity to initiate a second brood. Females that had their first brood delayed also had a shorter inter-brood interval and were moulting fewer feathers during second broods compared to controls, while females in better condition showed more advanced moult in second breeding attempts. Taken together, our results demonstrate the combined effects of age- or individual quality-mediated energetic trade-offs between current and future reproduction, and between investments in offspring and self-maintenance, on annual fecundity of female birds.

  6. Recognition of mite-infested brood by honeybee (Apis mellifera) workers may involve thermal sensing.

    PubMed

    Bauer, Daniel; Wegener, Jakob; Bienefeld, Kaspar

    2018-05-01

    Hygienic behavior, i.e. the removal of diseased or damaged brood by worker honey bees (Apis mellifera), is seen as one of the principal behavioral elements of this species' social immunity. Identification of the stimuli that trigger it would be helpful in searching for biochemical and molecular markers of this important breeding trait. While many studies at the genomic, transcriptomic, and behavioral level have pointed to the implication of chemical cues, we here hypothesized that thermal cues are alternatively/additionally involved. To test this hypothesis, we first measured whether infestation by the mite Varroa destructor (a condition known to induce hygienic behavior) leads to a thermal gradient between affected and unaffected brood. We found that infested brood cells were between 0.03 and 0.19 °C warmer than uninfested controls. Next, we tested whether artificially heating an area of a brood comb would increase the removal of infested or uninfested brood as compared to an unheated control area, and found that this was not the case. Finally, we investigated whether the heating of individual brood cells, as opposed to comb areas, would influence brood removal from cells adjacent to the heated one. This was the case for uninfested, though not for infested cells. We conclude that infestation by V. destructor leads to a heating of brood cells that should be perceivable by bees, and that small-scale temperature gradients can influence brood removal. This makes it appear possible that thermal cues play a role in triggering hygienic behavior of honey bees directed at varroa-infested larvae/pupae, although our results are insufficient to prove such an involvement. Copyright © 2018. Published by Elsevier Ltd.

  7. Fiscal Year (FY) 2001 Budget Estimates. Army National Guard. Military Construction Program FY 2001. Justification Data Submission to Congress. Department of the Army.

    DTIC Science & Technology

    2000-02-01

    CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1

  8. Report of the Secretary of Defense Caspar W. Weinberger to the Congress on the FY 1987 Budget, FY 1988 Authorization Request and FY 1987-1991 Defense Programs, February 5, 1986

    DTIC Science & Technology

    1986-02-05

    saries. When have these values -- freedom of individual citizens, democratically chosen governments, market economies, and a lawful international economic...to the plan of action for pene- trating a new market . In addition to the broad goals of the firm, strategy encompasses key operating policies by...threats on the other. A sustainable corporate strategy must match the particular strengths of the corporation with competitive forces in its markets

  9. Department of the Navy FY 1990/FY 1991 Biennial Budget Estimates. Military Construction and Family Housing Program FY 1991. Justification Data Submitted to Congress

    DTIC Science & Technology

    1989-01-01

    environmental review process as indicated by the County Traffic Engineers for safe and secure transport of ordnance as well as the chosen alternative...from other appropriations: None. PRVOSEDITION$ MAY SE USED ITRALDD DE 7 PG NO.DD • 391C UNTIL XHAUSTEDP N. S.PRRMELMN . CATGOR OO 7..POETNMER U JC...service. IMPACT IF NOT PROVIDED: Activity must rely r.n truck refuelers which are not Capable of handling the demand. Time delays, logisticA and safety

  10. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-08

    Search Radar modification to CVN–79 and CVN–80. (G) A business case analysis for the two-phase CVN–79 delivery proposal and impact on fleet...the start-stop-start-stop cycle over a stretched period of time and that’s a big cost impact . But the challenge is by the same token, the build cycle...What are the estimated savings of this proposal in FY2017, and over the FY2017-FY2021 Future Years Defense Plan (FYDP)?  What impact would

  11. Independent Auditors Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control Program Activities

    DTIC Science & Technology

    2016-01-29

    No. DODIG-2016-041 J A N U A R Y 2 9 , 2 0 1 6 Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds...Defense that supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs...THE ARMY SUBJECT: Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control

  12. FY 1977 Budget and its Implications for the FY 1978 Authorization Request and the FY 1977-1981 Defense Programs

    DTIC Science & Technology

    1976-01-27

    further support reductions would be inadvisable. Therefore, it may be necessaty to maintain the combat-to-support ratio at Vie post-Nunn Amendment level...263 Acquisition of the A-10 Clow Art Support Aircraft 266 457 81 618 927 Durefopment and Acquisition of E-3A AWACS 1 610 466 8t 684 466 Oftelopment n...understanding of both pertinent technology a’nd management principles to ensure their continued contribution to the force, Such schooling , whether geared to

  13. Lewis and Clark National Historical Park Elk Monitoring Program Annual Report 2010

    USGS Publications Warehouse

    Cole, Carla; Griffin, Paul; Jenkins, Kurt

    2012-01-01

    Data from FY09, FY10, and FY11 will be useful in the formal analyses of trend. Those three years of data will contribute to the preparation of a four-year analysis and report after only one more year. Quantitative estimates of relative use by elk throughout the Fort Clatsop unit will be provided in the four-year report in 2012. Those estimates will account for detection bias, which comes from an incomplete count of elk pellets that were present in the subplots at the time of survey.

  14. Introduction to Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Kohrs, Richard

    1992-01-01

    NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.

  15. Single paternity of clutches in American Woodcock

    USGS Publications Warehouse

    Ziel, H.; McAuley, D.G.; Rhymer, J.M.

    2000-01-01

    Based on behavioral observations, the mating system of American Woodcock has been variously described as monogamous, a dispersed lek, or resource defense polygyny. Males perform elaborate mating displays that attract females to their display sites where copulations occur. We used microsatellite markers, developed for Ruffs (Philomachus pugnax), to assess paternity in American Woodcock. In 3 yr, we collected blood samples from 21 females and broods and 90 males. We found no evidence of multiple paternity within broods; paternity in all broods could be explained by 1 father. For 8 broods, we were able to infer probable fathers from males we sampled in the field. All 8 broods were found close to the singing site of the male or males that matched as possible fathers. Two males may have fathered 2 broods each, suggesting that polygyny may be a component of the woodcock mating system.

  16. 75 FR 341 - FY 2010-FY 2011 Broad Agency Announcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Agency's strategic plan and mission goals, as well as to provide the general public with information and... and programs associated with the Agency's strategic plan and mission goals, as well as to provide the... systematic approach that links our strategic goals through multi-year plans to the daily activities of our...

  17. Data and Characteristics of the Illinois Public Community College System.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    Data on the Illinois public community colleges, covering fiscal year (FY) 1991 and part of FY 1992, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. Introductory material provides a profile of the colleges, a map of college districts, and a list of…

  18. Data and Characteristics of the Illinois Public Community College System.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    Data on the Illinois public community colleges, covering fiscal year (FY) 1990 and part of FY 1991, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. After introductory material provides a profile of the colleges and a map of college districts, section I…

  19. 78 FR 45187 - Notice of a Joint Technical Assistance Workshop for Preparing Fiscal Year (FY) 2014 Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... for programs authorized by Title VI of the Higher Education Act (HEA) that the Department expects to... DEPARTMENT OF EDUCATION Notice of a Joint Technical Assistance Workshop for Preparing Fiscal Year (FY) 2014 Grant Applications AGENCY: International and Foreign Language Education, Office of...

  20. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...

  1. Genome-wide association study for identifying genome loci that affect fillet yield in rainbow trout (Oncorhynchus mykiss)

    USDA-ARS?s Scientific Manuscript database

    Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that reflects production efficiency. Despite that, FY has not received much attention in breeding programs because it is costly to measure and difficult to select on, limiting the genetic progress in traditional sel...

  2. Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress

    DTIC Science & Technology

    2015-12-22

    the ships. The Navy continues to review manning to determine appropriate levels, and is adding 20 berths to all seaframes. The increased berthing ...ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the FY2010 ships and the other team getting one

  3. Supersonic Cruise Research (SCR) program publications for fiscal year 1977 through fiscal year 1979: Preliminary bibliography. [bibliographies

    NASA Technical Reports Server (NTRS)

    Hoffman, S.

    1979-01-01

    Approximately 512 bibliographies are presented for the time period from FY 77 to FY 79. Several non-SCR publications and a few papers not included in the last publication are included. Topics include propulsion, stratospheric emissions impact, materials and structure, aerodynamic performance, and stability and control.

  4. 75 FR 63848 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... application process, funding criteria and eligibility requirements can be found using the Department of... Education and Training Community Facilities (CFCF) Program is 14-890. Applications must be submitted...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Capital Fund Education and Training...

  5. 78 FR 71555 - Medicare Program; Town Hall Meeting on FY 2015 Applications for New Medical Services and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... FY 2015 new medical services and technologies applications meet the substantial clinical improvement... new medical services and technologies under Medicare. Effective for discharges beginning on or after... specifies that a medical service or technology will be considered ``new'' if it meets criteria established...

  6. 78 FR 7750 - Emergency Food Assistance Program; Availability of Foods for Fiscal Year 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ..., fish, vegetables, dry beans, juices, and fruits. Approximately $274.5 million in surplus foods acquired in FY 2012 are being delivered to States in FY 2013. These foods include beans (dried, canned..., frozen ham, frozen turkey roast, blackeye beans, garbanzo beans, great northern beans, light red kidney...

  7. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  8. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  9. 76 FR 59265 - Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Skilled Nursing Facilities for FY 2012; Correction AGENCY: Centers for Medicare & Medicaid Services (CMS... Nursing Facilities for FY 2012'' that appeared in the August 8, 2011 Federal Register. DATES: Effective... October 1, 2011. II. Summary of Errors The Addendum to the Skilled Nursing Facility (SNF) Prospective...

  10. Evaluation of Educational Personnel Development Projects in Indian Education. Final Report.

    ERIC Educational Resources Information Center

    Wechsler, Marjorie E.; And Others

    The Educational Personnel Development (EPD) program provides training for educational personnel to serve American Indian and Alaska Native students. From FY 1987 to FY 1991, EPD grants averaging $2.25 million per year were awarded to 21 institutions, which provided academic counseling, direct financial assistance, and supplemental training to a…

  11. Venus Data Analysis Program: Directory of Research Projects (1993-1994)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This directory provides information about the scientific investigations funded by the NASA Venus Data Analysis Program (VDAP) during fiscal year 1993. The VDAP Directory consists of summary sheets from the proposals that were selected by NASA for funding in FY 93. Each summary sheet indicates the title, principal investigator, institution of the investigation, and information related to the objectives of the research activities proposed for FY 93. The objective of the VDAP Program is to advance our understanding of the nature and evolution of Venus. VDAP supports scientific investigation using data obtained from the Magellan, Pioneer Venus, and other Venus missions, as well as earth-based observations that contribute to understanding the physical and evolutionary properties of Venus. The program intends to enhance the scientific return from these missions by broadening the participation in the analysis of Venus data. Categories of research funded by VDAP are atmosphere, ionosphere, geology, geophysics, and mapping. The directory is intended to provide the science community with an overview of the research projects supported by this program. Research activities identified in this directory were selected for funding in FY 93 on the basis of scientific peer review conducted by the VDAP Review Panel.

  12. Kairomonal responses of natural enemies and associates of the Southern Ips (Coleoptera: Curculionidae: Scolytinae) to Ipsdienol, Ipsenol and Cis-Verbenol

    Treesearch

    Jeremy D. Allison; Jessica L. McKenney; Daniel R. Miller; Matthew L. Gimmel

    2013-01-01

    Bark beetle infested pines are an ephemeral habitat utilized by a diverse assemblage of insects. Although many bark beetle insect associates have little or no measurable impact on bark beetle brood production, some reduce brood production by either competing with brood for the limited phloem tissue or by feeding on brood. Several studies have observed synchrony between...

  13. Duckling survival, fecundity, and habitat selection of mottled duck broods on the upper Texas Gulf Coast

    USGS Publications Warehouse

    Rigby, Elizabeth A.; Haukos, David A.

    2015-01-01

    Mottled ducks (Anas fulvigula) on the western Gulf Coast have exhibited a steep population decline since the mid 1990s. Low rates of breeding incidence and nest success have been implicated in this decline, but duckling survival and the habitat needs of broods have not been previously investigated in this region. We fitted mottled duck ducklings and adult females with radio transmitters and tracked broods to estimate duckling survival and brood habitat selection on the upper Texas Gulf Coast. Duckling survival to 30 days was high (range among models 0.354–0.567) compared to other dabbling duck species. Estimated fecundity was low, (range among models 0.398–0.634) however, indicating that overall reproductive output is low. Within coastal marsh, broods selected home ranges with more water cover and less upland and fresh marsh landcover than was available in the study area. Within coastal marsh home ranges, broods selected for water cover relative to other landcover types, and there was some evidence that broods avoided unvegetated landcover. Although high quality brood habitat is undeniably important, management efforts to increase mottled duck population growth on the western Gulf Coast may best be spent on increasing nesting habitat quality to increase nest success and breeding incidence.

  14. Origins, evolution, and diversification of cleptoparasitic lineages in long-tongued bees.

    PubMed

    Litman, Jessica R; Praz, Christophe J; Danforth, Bryan N; Griswold, Terry L; Cardinal, Sophie

    2013-10-01

    The evolution of parasitic behavior may catalyze the exploitation of new ecological niches yet also binds the fate of a parasite to that of its host. It is thus not clear whether evolutionary transitions from free-living organism to parasite lead to increased or decreased rates of diversification. We explore the evolution of brood parasitism in long-tongued bees and find decreased rates of diversification in eight of 10 brood parasitic clades. We propose a pathway for the evolution of brood parasitic strategy and find that a strategy in which a closed host nest cell is parasitized and the host offspring is killed by the adult parasite represents an obligate first step in the appearance of a brood parasitic lineage; this ultimately evolves into a strategy in which an open host cell is parasitized and the host offspring is killed by a specialized larval instar. The transition to parasitizing open nest cells expanded the range of potential hosts for brood parasitic bees and played a fundamental role in the patterns of diversification seen in brood parasitic clades. We address the prevalence of brood parasitic lineages in certain families of bees and examine the evolution of brood parasitism in other groups of organisms. © 2013 The Author(s). Evolution © 2013 The Society for the Study of Evolution.

  15. Chick loss from mixed broods reflects severe nestmate competition between an evictor brood parasite and its hosts.

    PubMed

    Moskát, Csaba; Hauber, Márk E

    2010-03-01

    Hatchlings of the obligate brood parasite common cuckoo Cuculus canorus typically evict eggs and nestmates but, rarely, host and parasite nestlings may grow up together. As part of previous experiments, we manipulated host clutches by inducing two great reed warbler Acrocephalus arundinaceus and one parasite young to share a nest from 4 days posthatch, when the cuckoo's eviction behaviour is thought to cease. We documented that in mixed broods typically at least one nestling eventually fell out of nest during the period of 5-10 days posthatch. In 83% of nests one or two host chicks disappeared, and in 17% of nests parasite chicks were lost. All nestlings remained in control broods of three hosts or one parasite. These results imply strong physical competition for space in mixed broods. We suggest that continued foster care for parasitized broods may occasionally be beneficial because host nestlings have some chance to escape the costs of parasitism, even when their parents fail to reject the parasite's egg and the parasite hatchling fails to evict nestmates. Conversely, evictor parasite chicks benefit not only through improved growth, as reported before, but also through the elimination of nestmate competition for space and the risk of displacement from mixed broods. Copyright (c) 2010 Elsevier B.V. All rights reserved.

  16. Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2017, SNF Value-Based Purchasing Program, SNF Quality Reporting Program, and SNF Payment Models Research. Final rule.

    PubMed

    2016-08-05

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2017. In addition, it specifies a potentially preventable readmission measure for the Skilled Nursing Facility Value-Based Purchasing Program (SNF VBP), and implements requirements for that program, including performance standards, a scoring methodology, and a review and correction process for performance information to be made public, aimed at implementing value-based purchasing for SNFs. Additionally, this final rule includes additional polices and measures in the Skilled Nursing Facility Quality Reporting Program (SNF QRP). This final rule also responds to comments on the SNF Payment Models Research (PMR) project.

  17. Tricks of the trade: Mechanism of brood theft in an ant.

    PubMed

    Paul, Bishwarup; Annagiri, Sumana

    2018-01-01

    Thievery is ubiquitous in the animal kingdom, social insects not being an exception. Brood is invaluable for the survival of social insect colonies and brood theft is well documented in ants. In many species the stolen brood act as slaves in the thief colony as they take up tasks related to foraging, defence and colony maintenance. Slave-making (dulotic) ants are at an advantage as they gain workforce without investing in rearing immature young, and several slave-making species have been recorded in temperate regions. In the current study we investigate brood theft in a primitively eusocial ponerine ant Diacamma indicum that inhabits the tropics. In the context of colony relocation we asked how thieves steal brood and what victim colonies do to prevent theft. While exposed nests increased colonies' vulnerability, the relocation process itself did not enhance the chances of theft. Various aggressive interactions, in particular immobilization of intruders helped in preventing theft. Thieves that acted quickly, stayed furtive and stole unguarded brood were found to be successful. This comprehensive study of behavioural mechanism of theft reveals that these are the 'tricks' adopted by thieves.

  18. Nestling immunocompetence and testosterone covary with brood size in a songbird.

    PubMed Central

    Naguib, Marc; Riebel, Katharina; Marzal, Alfonso; Gil, Diego

    2004-01-01

    The social and ecological conditions that individuals experience during early development have marked effects on their developmental trajectory. In songbirds, brood size is a key environmental factor affecting development, and experimental increases in brood size have been shown to have negative effects on growth, condition and fitness. Possible causes of decreased growth in chicks from enlarged broods are nutritional stress, crowding and increased social competition, i.e. environmental factors known to affect adult steroid levels (especially of testosterone and corticosteroids) in mammals and birds. Little, however, is known about environmental effects on steroid synthesis in nestlings. We addressed this question by following the development of zebra finch (Taeniopygia guttata) chicks that were cross-fostered and raised in different brood sizes. In line with previous findings, nestling growth and cell-mediated immunocompetence were negatively affected by brood size. Moreover, nestling testosterone levels covaried with treatment: plasma testosterone increased with experimental brood size. This result provides experimental evidence that levels of circulating testosterone in nestlings can be influenced by their physiological response to environmental conditions. PMID:15255102

  19. Survival of juvenile black brant during brood rearing

    USGS Publications Warehouse

    Flint, Paul L.; Sedinger, James S.; Pollock, Kenneth H.

    1995-01-01

    Survival of young is an important and poorly understood component of waterfowl productivity. We estimated survival of black brant (Branta bernicla nigricans) goslings during summers 1987-89 on the Yukon-Kuskokwim Delta, Alaska, to determine timing and magnitude of gosling mortality and to compare methods of estimating gosling survival. Eighty-two percent of radio-tagged adult females (n = 61) fledged ≥1 gosling (brood success). We estimated survival of goslings within broods by 3 methods: (1) changes in mean brood size through time, (2) observation of goslings associated with marked adults, and (3) age ratios of brant captured in banding drives. Estimates of gosling survival within successful broods averaged 81% and ranged from 66 to 92%. Combining brood success and gosling survival within successful broods yielded estimates of overall gosling survival that averaged 68%, ranging from 79% in 1987 to 56% in 1989. Eighty-two percent of gosling mortality occurred in the first 15 days. Estimates of survival on the basis of age ratios of birds captured in banding drives are biased low. Our estimates of average gosling survival are higher than reported for other species of geese.

  20. Simultaneous spawning by female stream goby Rhinogobius sp. and the association with brood cannibalism by nesting males.

    PubMed

    Ito, S; Iwao, H; Sakata, J; Inoue, M; Omori, K; Yanagisawa, Y

    2016-09-01

    A laboratory experiment was conducted by varying the undersurface area of nesting substratum and the number of females in an experimental tank to elucidate the determinants of the mating pattern in the stream goby, Rhinogobius sp. cross-band type. Males with larger nests tended to attract two or more females to their nest in a tank. Moreover, males spawned simultaneously with multiple females and entire brood cannibalism by males was rarely observed under a female-biased sex ratio. When males spawned with a single female with low fecundity, however, entire brood cannibalism occurred at a high frequency, suggesting that a male guarding a nest with fewer eggs consumes the brood. Therefore, spawning behaviour of females that leads to a large egg mass would decrease the risk of entire brood cannibalism. In this species, simultaneous spawning by multiple females in a nest serves as a female counter-measure against entire brood cannibalism. These results suggest that a conflict of interest between the sexes through brood cannibalism is a major determinant of simultaneous spawning. © 2016 The Fisheries Society of the British Isles.

  1. Indiana chronic disease management program risk stratification analysis.

    PubMed

    Li, Jingjin; Holmes, Ann M; Rosenman, Marc B; Katz, Barry P; Downs, Stephen M; Murray, Michael D; Ackermann, Ronald T; Inui, Thomas S

    2005-10-01

    The objective of this study was to compare the ability of risk stratification models derived from administrative data to classify groups of patients for enrollment in a tailored chronic disease management program. This study included 19,548 Medicaid patients with chronic heart failure or diabetes in the Indiana Medicaid data warehouse during 2001 and 2002. To predict costs (total claims paid) in FY 2002, we considered candidate predictor variables available in FY 2001, including patient characteristics, the number and type of prescription medications, laboratory tests, pharmacy charges, and utilization of primary, specialty, inpatient, emergency department, nursing home, and home health care. We built prospective models to identify patients with different levels of expenditure. Model fit was assessed using R statistics, whereas discrimination was assessed using the weighted kappa statistic, predictive ratios, and the area under the receiver operating characteristic curve. We found a simple least-squares regression model in which logged total charges in FY 2002 were regressed on the log of total charges in FY 2001, the number of prescriptions filled in FY 2001, and the FY 2001 eligibility category, performed as well as more complex models. This simple 3-parameter model had an R of 0.30 and, in terms in classification efficiency, had a sensitivity of 0.57, a specificity of 0.90, an area under the receiver operator curve of 0.80, and a weighted kappa statistic of 0.51. This simple model based on readily available administrative data stratified Medicaid members according to predicted future utilization as well as more complicated models.

  2. Pointing and control system enabling technology for future automated space missions

    NASA Technical Reports Server (NTRS)

    Dahlgren, J. B.

    1978-01-01

    Future automated space missions present challenging opportunities in the pointing-and-control technology disciplines. The enabling pointing-and-control system technologies for missions from 1985 to the year 2000 were identified and assessed. A generic mission set including Earth orbiter, planetary, and other missions which predominantly drive the pointing-and-control requirements was selected for detailed evaluation. Technology candidates identified were prioritized as planning options for future NASA-OAST advanced development programs. The primary technology thrusts in each candidate program were cited, and advanced development programs in pointing-and-control were recommended for the FY 80 to FY 87 period, based on these technology thrusts.

  3. The internal-brooding apparatus in the bryozoan genus Cauloramphus (Cheilostomata: Calloporidae) and its inferred homology to ovicells.

    PubMed

    Ostrovsky, Andrew N; Dick, Matthew H; Mawatari, Shunsuke F

    2007-12-01

    We studied by SEM the external morphology of the ooecium in eight bryozoans of the genus Cauloramphus (Cheilostomata, Calloporidae): C. spinifer, C. variegatus, C. magnus, C. multiavicularia, C. tortilis, C. cryptoarmatus, C. niger, and C. multispinosus, and by sectioning and light microscopy the anatomy of the brooding apparatus of C. spinifer, C. cryptoarmatus, and C. niger. These species all have a brood sac, formed by invagination of the non-calcified distal body wall of the maternal zooid, located in the distal half of the maternal (egg-producing) autozooid, and a vestigial, maternally budded kenozooidal ooecium. The brood sac comprises a main chamber and a long passage (neck) opening externally independently of the introvert. The non-calcified portion of the maternal distal wall between the neck and tip of the zooidal operculum is involved in closing and opening the brood sac, and contains both musculature and a reduced sclerite that suggest homology with the ooecial vesicle of a hyperstomial ovicell. We interpret the brooding apparatus in Cauloramphus as a highly modified form of cheilostome hyperstomial ovicell, as both types share 1) a brood chamber bounded by 2) the ooecium and 3) a component of the distal wall of the maternal zooid. We discuss Cauloramphus as a hypothetical penultimate stage in ovicell reduction in calloporid bryozoans. We suggest that the internal-brooding genus Gontarella, of uncertain taxonomic affinities, is actually a calloporid and represents the ultimate stage in which no trace of the ooecium remains. Internal brooding apparently evolved several times independently within the Calloporidae.

  4. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  5. 75 FR 52771 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-08] Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian Community Development Block Grant... retained to fund Imminent Threat Grants. The purpose of the ICDBG program is the development of viable...

  6. Environmentally Responsible Aviation Project: Infrastructure Enhancements and New Capabilities

    NASA Technical Reports Server (NTRS)

    Bezos-OConnor, Gaudy M.

    2015-01-01

    This oral presentation highlights the technical investments the NASA Environmentally Responsible Aviation Project under the Integrated Systems Research Program within ARMD made during FY10-FY14 to upgrade/enhance the NASA infrastructure/testing assets and new capabilities required to mature the ERA N=2 Portfolio of airframe and propulsion technologies to TRL 5/6.

  7. 75 FR 34614 - Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... footnoted).'' c. Third column, the title, ``Table 4J.--Out-Migration Adjustment-- FY 2010 (April 1, 2010 through September 30, 2010)'' is corrected to read ``Table 4J.--(Abbreviated) Out-Migration Adjustment for... corrected to read as follows: Table 4J--(Abbreviated) Out-Migration Adjustment for Acute Care Hospitals--FY...

  8. Caps and gaps: a computer model for studies on brood incubation strategies in honeybees (Apis mellifera carnica)

    NASA Astrophysics Data System (ADS)

    Fehler, Manuel; Kleinhenz, Marco; Klügl, Franziska; Puppe, Frank; Tautz, Jürgen

    2007-08-01

    In addition to heat production on the comb surface, honeybee workers frequently visit open cells (“gaps”) that are scattered throughout the sealed brood area, and enter them to incubate adjacent brood cells. We examined the efficiency of this heating strategy under different environmental conditions and for gap proportions from 0 to 50%. For gap proportions from 4 to 10%, which are common to healthy colonies, we find a significant reduction in the incubation time per brood cell to maintain the correct temperature. The savings make up 18 to 37% of the time, which would be required for this task in completely sealed brood areas without any gaps. For unnatural high proportions of gaps (>20%), which may be the result of inbreeding or indicate a poor condition of the colony, brood nest thermoregulation becomes less efficient, and the incubation time per brood cell has to increase to maintain breeding temperature. Although the presence of gaps is not essential to maintain an optimal brood nest temperature, a small number of gaps make heating more economical by reducing the time and energy that must be spent on this vital task. As the benefit depends on the availability, spatial distribution and usage of gaps by the bees, further studies need to show the extent to which these results apply to real colonies.

  9. Effects of brood pheromone (SuperBoost) on consumption of protein supplement and growth of honey bee (Hymenoptera: Apidae) colonies during fall in a northern temperate climate.

    PubMed

    Sagili, Ramesh R; Breece, Carolyn R

    2012-08-01

    Honey bee, Apis mellifera L. (Hymenoptera: Apidae), nutrition is vital for colony growth and maintenance of a robust immune system. Brood rearing in honey bee colonies is highly dependent on protein availability. Beekeepers in general provide protein supplement to colonies during periods of pollen dearth. Honey bee brood pheromone is a blend of methyl and ethyl fatty acid esters extractable from cuticle of honey bee larvae that communicates the presence of larvae in a colony. Honey bee brood pheromone has been shown to increase protein supplement consumption and growth of honey bee colonies in a subtropical winter climate. Here, we tested the hypothesis that synthetic brood pheromone (SuperBoost) has the potential to increase protein supplement consumption during fall in a temperate climate and thus increase colony growth. The experiments were conducted in two locations in Oregon during September and October 2009. In both the experiments, colonies receiving brood pheromone treatment consumed significantly higher protein supplement and had greater brood area and adult bees than controls. Results from this study suggest that synthetic brood pheromone may be used to stimulate honey bee colony growth by stimulating protein supplement consumption during fall in a northern temperate climate, when majority of the beekeepers feed protein supplement to their colonies.

  10. Influence of behavior and mating success on brood-specific contribution to fish recruitment in ponds.

    PubMed

    Parkos, Joseph J; Wahl, David H; Philipp, David P

    2011-10-01

    One source of uncertainty in predicting the response of populations to exploitation is individual differences within a population in both vulnerability to capture and contribution to population renewal. For species with parental care, individuals engaged in nesting behavior are often targeted for exploitation, but predicting outcomes of this nonrandom vulnerability will depend in part on an understanding of how parental traits are related to potential for brood contribution to the population. Variation in brood-specific contribution to recruitment of largemouth bass (Micropterus salmoides), a fish species with extended parental care, was quantified to determine if differences in mating success, parental care behaviors, and timing of reproduction influenced offspring recruitment. Dependence of these relationships on brood predation was tested in communities that differed in the presence of bluegill, Lepomis macrochirus, an important nest predator. Daily snorkel surveys were conducted in experimental ponds during spring to monitor male spawning and parental care behaviors in populations of largemouth bass. Tissue samples collected from larvae in nests were used to develop brood-specific DNA fingerprints for determining nest origins of fall recruits. Largemouth bass spawning period in bluegill ponds was longer and more variable in duration, with lower, more variable mating success, than in ponds without bluegill. In all populations, only one or two broods provided the majority of recruits, and these were broods produced during the earliest days of spawning by the oldest, largest males. In bluegill ponds, brood contribution from earliest nests also increased with brood size. Earliest nesters were the oldest males, and recruits from these nests were often above average in body size. Offspring needed to be guarded to at least swim-up larval stage to contribute any recruits. Termination of parental protection before offspring were free swimming mainly occurred with broods guarded by smaller males in ponds with brood predators. These age- and size-specific differences in timing of spawning and duration of parental care are consistent with influences of residual reproductive value and energetic constraints on reproductive behavior. Furthermore, these patterns of individual contribution to recruitment imply that fisheries that selectively target either nesting individuals or larger, older males could potentially decrease recruitment at the population scale.

  11. Building America Systems Integration Research Annual Report: FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gestwick, M.

    2013-05-01

    This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  12. Nasa Program Plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  13. Energy materials coordinating committee (EMACC) Fiscal Year 1980. Annual technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-01-01

    This report contains information on the FY 1980 Department of Energy materials research and development programs and on those programs/projects with a significant materials activity. It was compiled by the Energy Materials Coordinating Committee (EMaCC). The previous report in this series summarized the FY 1979 programs (DOE/US-0002-2). The report is separated into sections, each containing programs reporting to one of six Assistant Secretaries of the Department: Conservation and Solar Energy, Defense Programs, Environment, Fossil Energy, Nuclear Energy, and Resource Applications; and one section, Energy Research, responsible to the Director of the Office of Energy Research. For convenience in locating themore » generic types of materials activities, an Appendix has been added that contains a primary keyword index.« less

  14. Education and Training Report. Performance Report, FY 1997

    NASA Technical Reports Server (NTRS)

    1997-01-01

    During FY 97, 152 MUREP education and training projects were conducted at OMU institutions. The institutions conducted precollege and bridge programs, education partnerships with other universities and industry, NRTS, teacher training, and graduate and/or PI undergraduate programs. These programs reached a total of 23,748 participants, with the predominant number at the precollege level and achieved major goals of heightening students' interest and awareness of career opportunities in MSET fields, and exposing students to the NASA mission, research and advanced technology through role models, mentors, and participation in research and other educational activities. Also in FY 1997, NASA continued a very meaningful relationship with the Hispanic Association of Colleges students and Universities (HACU) through Proyecto Access, a consortium through which HACU links seven HSI's together to conduct 8-week summer programs. OMU Institutions reported 4,334 high school student in NASA programs and 3,404 of those students selected college preparatory MSET courses. Three hundred and forty-nine (349) graduated from high school, 343 enrolled in college, and 199 selected MSET majors. There were 130 high school graduates (bridge students) in NASA programs, 57 of whom successfully completed their freshman year. There were 307 teachers in teacher programs and 48 teachers received certificates. Of the 389 undergraduate students, 75 received under graduate degrees, and eight students are employed in a NASA-related field.

  15. Department of the Navy FY 1990/FY 1991 Biennial Budget Estimates. Military Construction and Family Housing Program FY 1990. Justification Data Submitted to Congress

    DTIC Science & Technology

    1989-01-01

    Center, Panama City 314 Diver Training Building Addition 4,300 4 ,300 50 180 Subtotal 4,300 4,300 Navy Experimental Diving Unit 182 Panama City 347 ...Air Force 001 Security Training Center 4,500 4,500 100 345 Subtotal .4,500 4,500 TOTAL FOR TAS 28,220 28,220 Virginia Naval SecuritY Goui Activity 347 ...Building Addition 4,300 C NEDU Panama City, FL 347 Underwater Equipment Support Complex 2,900 C NPWC Pensacola, FL 109 Wastewater Transfer System 2,100 C

  16. Morphology of brood pouch formation in the pot-bellied seahorse Hippocampus abdominalis.

    PubMed

    Kawaguchi, Mari; Okubo, Ryohei; Harada, Akari; Miyasaka, Kazuki; Takada, Kensuke; Hiroi, Junya; Yasumasu, Shigeki

    2017-01-01

    The reproductive strategies of vertebrates are diverse. Seahorses (Pisces: Syngnathidae) possess the unique characteristic of male pregnancy; i.e., males, not females, incubate embryos in a specialized structure called a 'brood pouch'. The brood pouch is formed along the ventral midline of the tail. The lumen of the brood pouch is surrounded by loose connective tissue, called pseudoplacenta, and dermis. We visualized and evaluated the morphology of brood pouch formation in Hippocampus abdominalis to gain generalizable insights into this process in seahorses. First, we employed several staining methods to characterize the pseudoplacenta and dermis of the brood pouch of mature male seahorses. The pseudoplacenta is composed mainly of reticular fibers, while the dermis is composed mainly of collagenous fibers. Further observations showed that pouch formation is initiated by linear projections of epithelia on both ventrolateral sides of the body. These projections elongated toward the ventral midline, eventually fused together, and then formed a baggy structure composed of a single dermis layer with neither smooth muscle nor pseudoplacenta. Finally, the pseudoplacenta was formed, together with two layers of dermis and smooth muscle. Thus, a fully developed brood pouch was established. The morphology of the luminal epithelium also changed during pouch formation. We analyzed the localization of C-type lectins as markers; haCTL II was localized in both the outer and luminal epithelia of the brood pouch throughout development in the male seahorse, whereas haCTL IV, which was not detected in the early stage of seahorse development, became localized only in the luminal epithelium as development proceeded. We categorized the processes of brood pouch formation during male seahorse development into three stages: (1) the early stage, characterized by formation of a baggy structure from the primordium; (2) the middle stage, characterized by the differentiation and establishment of brood pouch-specific tissues; and (3) the late stage, characterized by a fully formed pouch with developing blood vessels and a pouch fold ultimately capable of carrying and incubating embryos.

  17. Sub-Lethal Effects of Pesticide Residues in Brood Comb on Worker Honey Bee (Apis mellifera) Development and Longevity

    PubMed Central

    Wu, Judy Y.; Anelli, Carol M.; Sheppard, Walter S.

    2011-01-01

    Background Numerous surveys reveal high levels of pesticide residue contamination in honey bee comb. We conducted studies to examine possible direct and indirect effects of pesticide exposure from contaminated brood comb on developing worker bees and adult worker lifespan. Methodology/Principal Findings Worker bees were reared in brood comb containing high levels of known pesticide residues (treatment) or in relatively uncontaminated brood comb (control). Delayed development was observed in bees reared in treatment combs containing high levels of pesticides particularly in the early stages (day 4 and 8) of worker bee development. Adult longevity was reduced by 4 days in bees exposed to pesticide residues in contaminated brood comb during development. Pesticide residue migration from comb containing high pesticide residues caused contamination of control comb after multiple brood cycles and provided insight on how quickly residues move through wax. Higher brood mortality and delayed adult emergence occurred after multiple brood cycles in contaminated control combs. In contrast, survivability increased in bees reared in treatment comb after multiple brood cycles when pesticide residues had been reduced in treatment combs due to residue migration into uncontaminated control combs, supporting comb replacement efforts. Chemical analysis after the experiment confirmed the migration of pesticide residues from treatment combs into previously uncontaminated control comb. Conclusions/Significance This study is the first to demonstrate sub-lethal effects on worker honey bees from pesticide residue exposure from contaminated brood comb. Sub-lethal effects, including delayed larval development and adult emergence or shortened adult longevity, can have indirect effects on the colony such as premature shifts in hive roles and foraging activity. In addition, longer development time for bees may provide a reproductive advantage for parasitic Varroa destructor mites. The impact of delayed development in bees on Varroa mite fecundity should be examined further. PMID:21373182

  18. FY2004 SYSTEM ENGINEER PROGRAM MANAGER ANNUAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JACKSON, G.J.

    2004-10-29

    During FY 2004, reviews of the FH System Engineer (SE) Program were conducted by the Independent Assessment (IA) Group. The results of these reviews are summarized as a part of this document. Additional reviews were performed by FH Engineering personnel. SE Engineering reviews performed include Periodic Walkdowns (typically, quarterly) by the SEs, a review of System Notebooks by the System Engineer Program Manager (SEPM), annual status report by each SE, and an annual status report by each of the Project Chief Engineers (PCEs). FY 2004 marked the completion of the first round of Vital Safety System assessments. Each of themore » VSSs on the FH VSS list has been evaluated at least once by either the FH Independent Assessment organization or was included as a part of DOE Phase II assessment. Following the completion of the K-Basins Assessment in May 2004, a review of the VSS assessment process was completed. Criteria were developed by FH, and concurred with by RL, to determine the frequency and priority of future VSS assessments. Additional actions have been taken to increase the visibility and emphasis assigned to VSSs. Completion of several Documented Safety Analyses (DSA), in combination with efforts to remove source term materials from several facilities, enabled the number of systems on the FH VSS list to be reduced from 60 at the beginning of FY 2004 to 48 by the end of FY 2004. It is expected that there will be further changes to the FH VSS list based on additional DSA revisions and continued progress towards reduction of source terms across the Hanford Site. Other new VSSs may be added to the list to reflect the relocation of materials away from the River Corridor to interim storage locations on the Central Plateau.« less

  19. Systemic Changes in the Undergraduate Chemistry Curriculum Program Awards

    NASA Astrophysics Data System (ADS)

    1995-07-01

    The National Science Foundation has awarded over 10 million in awards to four coalitions in the first round of full awards in the Systemic Changes in the Undergraduate Chemistry Curriculum program. Overall, more than 50 institutions, ranging from large universities to four-year and community colleges, are formally involved in these projects. Each of the projects will involve five years of curricular development and evaluation and dissemination of the results by the participating institutions, as described in the abstracts below. We encourage faculty who are interested in becoming involved in any of these projects to contact the appropriate coalition. In addition, we expect to begin offering an emphasis in 1997 under the Course and Curriculum Development program in which faculty can request funds to assist them in adapting and adopting at their own institutions curricular innovations that have been developed by these coalitions. Another round of proposals for full awards was accepted in June of 1995, and we expect to make one more award in the program during FY1996. We do not expect to accept proposals for either planning or full grants in this program in June of 1996. However, the regular Course and Curriculum Development program will continue to accept and fund proposals requesting support for smaller-scale changes in the chemistry curriculum. ChemLinks Coalition: Making Chemical Connections Brock Spencer Beloit College, Beloit, WI 53511 DUE 9455918: FY1995, 705,000; FY 1996, 655,000; FY1997, 655,000; FY1998, 350,00; FY1999, 350,000 The ChemLinks Coalition is undertaking a five-year project to change the way students learn chemistry, increase scientific literacy for all students taking chemistry, and promote the process of educational reform. In collaboration with the ModularChem Consortium, faculty are developing, testing, and disseminating modular course materials that use active and collaborative approaches to learning. These materials, focused on the first two years of the chemistry curriculum, start with interdisciplinary questions important to students and to society (the molecular basis of life, the environment, technology), and in answering them develop an appreciation of how science is actually done. This approach is designed to reach a broader student audience more effectively than do traditional courses, an audience that includes students who are members of groups traditionally underrepresented in science, nonscience majors, and those taking chemistry as a supporting course, as well as chemistry majors. By providing a model for students preparing for careers in teaching, this approach has an impact on Teacher Preparation Programs. Collaboration among faculty from different disciplines and a number of institutions supports and reinforces those who want to make changes. These leading liberal arts colleges (Beloit, Carleton, Colorado, Grinnell, Hope, Kalamazoo, Knox, Lawrence, Macalester, Rhodes, Spelman, St. Olaf, Wooster) and research universities (Chicago, Washington - St. Louis) already have experience working together on chemistry curricular reform. An alliance with the Advanced Technology Environmental Education Center's coalition of 2-year institutions assures an impact on Advanced Technology Education Programs. By using the extensive Project Kaleidoscope network to promote reform, the ChemLinks Coalition involves a much larger and more diverse group of institutions in making systemic and sustainable changes in undergraduate chemistry education. A Workshop Chemistry Curriculum David K. Gosser CUNY City College, New York, NY 10031 DUE 9455920: FY1995, 425,000; FY1996, 400,000; FY1997, 400,000; FY1998, 150,000; FY1999, 150,000 The City College Consortium, which includes ten senior and community colleges at the City University of New York, and the Universities of Pittsburgh, Pennsylvania, and Rochester, is developing and applying widely a new model of teaching. This model, called Workshop Chemistry, introduces participation and mentorship by recent completers of the course. Small group, student-led workshops are integral to the course structure. Every week two workshops, each an hour long, complement the lecture and laboratory components. The workshop model provides a collaborative learning experience that increases student involvement and provides a new role for students as mentors. In Workshop Chemistry, students learn the problem solving, communication, and teamwork skills crucial for success in the workplace while learning chemistry more effectively. Working together with the faculty, students become an active part of the community of the department. A prototype workshop model has been developed at City College in a general chemistry course for science and engineering majors and is being expanded and refined for a broad range of courses including preparatory chemistry, chemistry for allied health sciences, organic chemistry, instrumental, and analytical chemistry. The experience of students as workshop leaders provides a natural introduction to teaching that is being formalized through a Teacher Preparation component of the project. The workshop method is also being exploited and applied in curricula for technician education, an initiative relevant to Advanced Technology Education. The project evaluates Workshop Chemistry and disseminates it beyond the bounds of the consortium. Student Workshop Manuals that include the problem solving, model building, and simulation activities of the workshops are being produced for each course. New project partners will be invited to view workshops, to participate in faculty developments, and to implement pilot workshop courses at their own institutions. Sweeping Change in Manageable Units: A Modular Approach for Chemistry Curriculum Reform C. Bradley Moore University of California-Berkeley, Berkeley, CA 94720 DUE 9455924: FY1995, 755,000; FY1996, 705,000; FY1997, 705,000; FY1998, 350,000; FY1999, 350,000 The purpose of this program is to develop new curricula, materials and methods that will enhance the appreciation and learning of science, especially chemistry, for every undergraduate student such that all college graduates will command the knowledge and skills necessary to permit continued learning, lead productive lives, and make informed decisions. To accomplish this mission, a modular approach to teaching chemistry in the first two years of the undergraduate curriculum is being developed and evaluated. Modules of 1-4 weeks present fundamental chemistry to students in the context of a real-world problem or application and emphasize the links between chemistry and other disciplines. In collaboration with the ChemLinks Coalition, modules are being developed, tested and refined at the two- and four-year colleges and research universities comprising the two consortia. Curriculum materials, including text, lab, and multimedia components suitable for students from diverse cultural and ethnic backgrounds and usable at a wide variety of undergraduate institutions are being produced and distributed by an established publisher. Teaching methods that utilize current understanding of learning processes and emphasize active learning and the full spectrum of modern technologies are being supported, tested, and promulgated. A model support infrastructure for development and assessment of new materials and methods is being provided. A framework for continuous improvement of curricula should result from the work and be institutionalized within the consortium. Faculty workshops and sessions at national and regional meetings will be conducted to guarantee dissemination. Our consortium institutions now participate significantly in pre-service teacher training and education of advanced science or engineering technicians and are developing new programs in these areas. Thus, our program will strongly impact the Advanced Technological Education and Teacher Preparation Programs by developing modular materials appropriate to the task of educating future teachers and technicians. Establishing New Traditions: Revitalizing the Curriculum John W. Moore University of Wisconsin-Madison, Madison, WI 53706 DUE 9455928: FY1995, 949,968; FY1996, 899,999; FY1997, 899,941; FY1998, 499,941; FY1999, $499,742 This project establishes new traditions in the chemistry curriculum that optimize opportunities for all students to learn chemical facts and concepts, develop and pursue interests in chemistry and chemistry-related disciplines, and appreciate how an understanding of chemistry is important to life and living. We are changing fundamentally the ways students, faculty, and administrators view their roles, creating a student-centered, active-learning emphasis. We have a broad range of reforms, each of which is developed, tested, modified, thoroughly evaluated, and widely disseminated. We address five main areas that apply to all levels of the curriculum: student-focused active learning; inquiry-based/open-ended laboratories; interdisciplinary course clusters to create learning communities; a topic-oriented curriculum; and information technology/computer tools. Each development in each area is carefully evaluated, and only the best survive. Evaluation provides important information about the process of transfer of innovations among institutions of different types. To insure that our reforms are useful for all students, our consortium includes industry, public and private four-year institutions, minority institutions, and two-year colleges. The project gives special emphasis to students who choose teaching as a career option by main-streaming these students in courses that benefit them in both content and pedagogy. Students, including those in Science Education, are fully integrated into the development and implementation of the project, working on both research topics and evaluation. The project also gives special emphasis to community college students in Advanced Technological Education programs to ensure that they share in using the newly developed curriculum. The students in the ATE program will clearly benefit by being provided the five main areas of thrust that this coalition is developing. All the students emerge with greater comprehension and better retention of chemical knowledge, improved ability to apply chemical concepts to new problems, enhanced appreciation of the relation between chemistry and other disciplines, and skills that enable them to work effectively in multidisciplinary teams.

  20. Tricks of the trade: Mechanism of brood theft in an ant

    PubMed Central

    Paul, Bishwarup

    2018-01-01

    Thievery is ubiquitous in the animal kingdom, social insects not being an exception. Brood is invaluable for the survival of social insect colonies and brood theft is well documented in ants. In many species the stolen brood act as slaves in the thief colony as they take up tasks related to foraging, defence and colony maintenance. Slave-making (dulotic) ants are at an advantage as they gain workforce without investing in rearing immature young, and several slave-making species have been recorded in temperate regions. In the current study we investigate brood theft in a primitively eusocial ponerine ant Diacamma indicum that inhabits the tropics. In the context of colony relocation we asked how thieves steal brood and what victim colonies do to prevent theft. While exposed nests increased colonies’ vulnerability, the relocation process itself did not enhance the chances of theft. Various aggressive interactions, in particular immobilization of intruders helped in preventing theft. Thieves that acted quickly, stayed furtive and stole unguarded brood were found to be successful. This comprehensive study of behavioural mechanism of theft reveals that these are the ‘tricks’ adopted by thieves. PMID:29489858

  1. Mobbing and sitting tight at the nest as methods of avoiding brood parasitism.

    PubMed

    Rands, Sean A

    2012-04-06

    The arms race between brood parasites and their hosts has led to many different host behaviours for avoiding parasitism. Some of these behaviours are social, and require the presence of conspecifics to work effectively: in response to alarm calls, some species engage in mobbing behaviour where neighbours join nest tenants in attacking and repelling an invading brood parasite. There are risks involved for the neighbours, but it has been demonstrated that social mobbing allows individuals to learn about the presence of brood parasites in the environment, suggesting that social learning is occurring. Here, I consider whether using social signals to alert naive individuals to the presence of brood parasites is a suitable strategy, compared with sitting tight on the nest in response to the signal (which should reduce the chances of being parasitized). I also compare the efficiency of these strategies with the case where individuals fail to change behaviour in response a brood parasite. Using an individual-based simulation model, I demonstrate that both mobbing and sitting tight are effective strategies in response to a signal, and that mobbing is more effective when the chances of being parasitized increase. These results are discussed and compared with known host-brood parasite relationships.

  2. Do great tits (Parus major) starve to reproduce?

    PubMed

    Hõrak, Peeter; Jenni-Eiermann, Susanne; Ots, Indrek

    1999-05-01

    To test whether nest abandonment is associated with parental health state, reproductive parameters and parental condition indices were examined in relation to brood desertion in great tits. Before desertion, pairs that abandoned their broods in the second half of the nestling period had significantly higher nestling mortality as well as lower average weight of nestlings and entire broods. Independently of brood size, female great tits that deserted their broods on average weighed 1 g (>5%) more than non-deserters. Comparison of metabolic profiles revealed that deserting females were in better nutritional condition (inclined to fat deposition) than non-deserters, which showed symptoms of postresorptive catabolic state, as indicated by a lower level of plasma triglycerides, very low density lipoproteins, and a higher level of free fatty acids and β-hydroxy-butyrate. These results suggest that desertion can be regarded as a reproductive restraint and that non-deserting females invested at least some of their maintenance resources on brood rearing. We found no evidence that desertion or non-desertion was associated with age- or disease-related differences in residual reproductive values. Male condition was not related to brood abandonment, suggesting that desertions were primarily initiated by females.

  3. Blood sampling in juvenile buff-breasted sandpipers: Movement, weight change and survival

    USGS Publications Warehouse

    Lanctot, Richard B.

    1994-01-01

    The effect of blood sampling on juvenile Buff-breasted Sandpipers (Tryngites subruficollis) was evaluated by comparing movements, mass, and survival of 10 broods (37 chicks) that were bled and eight broods (31 chicks) that were not bled. Blood was sampled from the jugular vein of chicks when they weighed 9.1 ± 0.9 g (x̄ ± SD) on or within 1 d of hatch. Chicks showed few short-term negative effects from blood sampling. Individual chicks suffered little physical injury, and five of eight chicks where injury occurred (i.e., hematomas formed) survived to fledging. Furthermore, bled broods gained mass at a comparable rate during the first 5 d post-hatch, and were resighted at similar frequencies as broods that were not bled. Bled broods moved slightly longer distances than control broods 1 d after hatch, however. This increased activity may have been stress-induced, but was only temporary; bled and control broods made similar long-term movements, and the probability of resighting was similar at fledging. With the proper precautions, it appears that Buff-breasted Sandpiper young can be safely sampled for blood at an early age without causing undue harm.

  4. Ruminative subtypes and impulsivity in risk for suicidal behavior

    PubMed Central

    Valderrama, Jorge; Miranda, Regina; Jeglic, Elizabeth

    2016-01-01

    Rumination has been previously linked to negative psychological outcomes, including depression and suicidal behavior. However, there has been conflicting research on whether or not two different subtypes of rumination – brooding and reflection – are more or less maladaptive. The present research sought to (1) examine whether individuals high in brooding but lower in reflection would show higher trait and behavioral impulsivity, relative to individuals low in brooding and low in reflection; and (2) examine impulsivity as a mediator of the relation between ruminative subtypes and suicidal ideation. In Study 1, participants (N = 78) were recruited based on high, average, and low scores on a measure of brooding and reflective rumination. Individuals who scored high in brooding and average in reflection scored significantly higher in negative urgency, that is, in the tendency to act rashly in an attempt to reduce negative affect, than did those who scored low in brooding and low in reflection. Study 2 (N = 1638) examined the relationship between ruminative subtypes, impulsivity, and suicide risk. We found an indirect relationship between brooding and suicide risk through lack of premeditation and lack of perseverance, independently of reflection. These findings are discussed in relation to cognitive risk for suicide. PMID:26791398

  5. Service and Methods Demonstrations Program Summary Report

    DOT National Transportation Integrated Search

    1981-12-01

    This report summarizes the activities and accomplishments of the UMTA Service and Methods Demonstrations Program for FY 1979, 1980, and 1981. Overall program objectives, current activities, and future directions are briefly described. Current demonst...

  6. 2012 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-12-01

    The 2012 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for : Federal Fiscal Year (FY) 2012. The report covers the following programs: Urbanized Area Formula, Non-urbanized A...

  7. 2011 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-05-01

    The 2011 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2011. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  8. 2010 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-07-01

    The 2010 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2010. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  9. Laboratory Directed Research and Development FY 1998 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John Vigil; Kyle Wheeler

    This is the FY 1998 Progress Report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principle investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic, molecular, optical, and plasma physics, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less

  10. Laboratory directed research and development: FY 1997 progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil, J.; Prono, J.

    1998-05-01

    This is the FY 1997 Progress Report for the Laboratory Directed Research and Development (LDRD) program at Los Alamos National Laboratory. It gives an overview of the LDRD program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principal investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic and molecular physics and plasmas, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less

  11. Validation of genetic markers associated with chalkbrood resistance

    USDA-ARS?s Scientific Manuscript database

    Chalkbrood is one of the major fungal diseases of honey bee brood. Systemic mycoses caused by the fungus, Ascosphaera apis, may significantly reduce brood population, and consequently, colony strength and productivity. Developing genetic marker(s) associated with the enhanced brood survival will be ...

  12. Within-female plasticity in sex allocation is associated with a behavioural polyphenism in house wrens.

    PubMed

    Bowers, E K; Thompson, C F; Sakaluk, S K

    2016-03-01

    Sex allocation theory assumes individual plasticity in maternal strategies, but few studies have investigated within-individual changes across environments. In house wrens, differences between nests in the degree of hatching synchrony of eggs represent a behavioural polyphenism in females, and its expression varies with seasonal changes in the environment. Between-nest differences in hatching asynchrony also create different environments for offspring, and sons are more strongly affected than daughters by sibling competition when hatching occurs asynchronously over several days. Here, we examined variation in hatching asynchrony and sex allocation, and its consequences for offspring fitness. The number and condition of fledglings declined seasonally, and the frequency of asynchronous hatching increased. In broods hatched asynchronously, sons, which are over-represented in the earlier-laid eggs, were in better condition than daughters, which are over-represented in the later-laid eggs. Nonetheless, asynchronous broods were more productive later within seasons. The proportion of sons in asynchronous broods increased seasonally, whereas there was a seasonal increase in the production of daughters by mothers hatching their eggs synchronously, which was characterized by within-female changes in offspring sex and not by sex-biased mortality. As adults, sons from asynchronous broods were in better condition and produced more broods of their own than males from synchronous broods, and both males and females from asynchronous broods had higher lifetime reproductive success than those from synchronous broods. In conclusion, hatching patterns are under maternal control, representing distinct strategies for allocating offspring within broods, and are associated with offspring sex ratios and differences in offspring reproductive success. © 2015 European Society For Evolutionary Biology. Journal of Evolutionary Biology © 2015 European Society For Evolutionary Biology.

  13. Removal of drone brood from Apis mellifera (Hymenoptera: Apidae) colonies to control Varroa destructor (Acari: Varroidae) and retain adult drones.

    PubMed

    Wantuch, Holly A; Tarpy, David R

    2009-12-01

    The parasitic mite Varroa destructor Anderson & Trueman (Acari: Varroidae) has plagued European honey bees, Apis mellifera L. (Hymenoptera: Apidae), in the Americas since its introduction in the 1980s. For many years, these mites were sufficiently controlled using synthetic acaricides. Recently, however, beekeepers have experienced increased resistance by mites to chemical pesticides, which are also known to leave residues in hive products such as wax and honey. Thus there has been increased emphasis on nonchemical integrated pest management control tactics for Varroa. Because mites preferentially reproduce in drone brood (pupal males), we developed a treatment strategy focusing on salvaging parasitized drones while removing mites from them. We removed drone brood from colonies in which there was no acaricidal application and banked them in separate "drone-brood receiving" colonies treated with pesticides to kill mites emerging with drones. We tested 20 colonies divided into three groups: 1) negative control (no mite treatment), 2) positive control (treatment with acaricides), and 3) drone-brood removal and placement into drone-brood receiving colonies. We found that drone-brood trapping significantly lowered mite numbers during the early months of the season, eliminating the need for additional control measures in the spring. However, mite levels in the drone-brood removal group increased later in the summer, suggesting that this benefit does not persist throughout the entire season. Our results suggest that this method of drone-brood trapping can be used as an element of an integrated control strategy to control varroa mites, eliminating a large portion of the Varroa population with limited chemical treatments while retaining the benefits of maintaining adult drones in the population.

  14. Public Expenditures for Mental Health Services in Canadian Provinces: Dépenses publiques pour les services de santé mentale dans les provinces canadiennes.

    PubMed

    Wang, Jian; Jacobs, Philip; Ohinmaa, Arto; Dezetter, Anne; Lesage, Alain

    2018-04-01

    The purpose of this study is to measure provincial spending for mental health services in fiscal year (FY) 2013 and to compare these cost estimates to those of FY 2003. This study estimated the costs of publicly funded provincial mental health services in FY 2013 and compared them to the estimates for FY 2003 from a previously published report. Our data were obtained from publicly accessible databases. The cross-year cost comparisons for provincial mental health services were restricted to general and psychiatric hospital inpatients, clinical payments to physicians and psychologists, and prescribed psychotropic medications. Total public expenditures were inflation adjusted and expressed per capita and as a percentage of the total provincial health spending. Total public spending for mental health and addiction programs/services was estimated to be $6.75 billion for FY 2013. The largest component of the expenditures was hospital inpatient services ($4.02 billion, 59.6%), followed by clinical payments to physicians or psychologists ($1.69 billion, 25%), and then publicly funded prescribed psychotherapeutic medications ($1.04 billion, 15.4%). Nationally, the portion of total public spending on health that was spent on mental health decreased from FY 2003 to FY 2013 from 5.4% to 4.9%. Our results reveal that mental health spending, as a proportion of public health care expenditures, decreased in the decade from FY 2003 to FY 2013. Due to large differences in how the provinces report community mental health services, we still lack a comprehensive picture of the mental health system.

  15. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM ANNUAL REPORT TO THE DEPARTMENT OF ENERGY FOR FISCAL YEAR 1999. THE DEPARTMENT OF ENERGY, DECEMBER 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PAUL,P.; FOX,K.J.

    2000-07-01

    In FY 1999, the BNL LDRD Program funded 33 projects, 25 of which were new starts, at a total cost of $4,525,584. A table is presented which lists all of the FY 1999 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which are given. A total of 29 informal publications (abstracts, presentations, reports and workshop papers) were reported and an additional 23 formal (full length) papers were either published, are in press or being prepared for publication.more » The investigators on five projects have filed for patents. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. The complete summary of follow-on activities is as follows: Information Publications--29, Formal Papers--23, Grants/Proposals/Follow-on Funding--7. In conclusion, a significant measure of success is already attributable to the FY 1999 LDRD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less

  16. Pathway profiles based on gene-set enrichment analysis in the honey bee Apis mellifera under brood rearing-suppressed conditions.

    PubMed

    Kim, Kyungmun; Kim, Ju Hyeon; Kim, Young Ho; Hong, Seong-Eui; Lee, Si Hyeock

    2018-01-01

    Perturbation of normal behaviors in honey bee colonies by any external factor can immediately reduce the colony's capacity for brood rearing, which can eventually lead to colony collapse. To investigate the effects of brood-rearing suppression on the biology of honey bee workers, gene-set enrichment analysis of the transcriptomes of worker bees with or without suppressed brood rearing was performed. When brood rearing was suppressed, pathways associated with both protein degradation and synthesis were simultaneously over-represented in both nurses and foragers, and their overall pathway representation profiles resembled those of normal foragers and nurses, respectively. Thus, obstruction of normal labor induced over-representation in pathways related with reshaping of worker bee physiology, suggesting that transition of labor is physiologically reversible. In addition, some genes associated with the regulation of neuronal excitability, cellular and nutritional stress and aggressiveness were over-expressed under brood rearing suppression perhaps to manage in-hive stress under unfavorable conditions. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. 77 FR 52752 - Notice of FY 2012 Refugee Social Services Formula Awards to States and Wilson/Fish Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... allocations for Social Services are available on ORR's Web site at: http://www.acf.hhs.gov/programs/orr/policy...] Notice of FY 2012 Refugee Social Services Formula Awards to States and Wilson/Fish Alternative Project... allocation of Refugee Social Services formula awards to States and Wilson/Fish Alternative Project grantees...

  18. FY10 Defense Environmental Programs Annual Report to Congress

    DTIC Science & Technology

    2011-07-01

    7,412- 2019  AIR FORCE ALPENA COUNTY REGIONAL AIRPORT / MI557282890300 17 2 $6,363 $0 $862 $1,9462012 2018  FORMERLY USED DEFENSE SITES ASH FIELD...Through FY10 ($000) IRP MMRPMMRPIRP Michigan ALPENA AAF / MI59799F231100 $001 $23 ALPENA NGTR / MI59799F228900 $610 $0 ANN ARBOR NGTR / MI59799F228800

  19. Library Statistics Program: State Library Agency Report for FY 2006

    ERIC Educational Resources Information Center

    Institute of Museum and Library Services, 2007

    2007-01-01

    This report marks the first release of library statistics data from the Institute of Museum and Library Services. It contains data on state library agencies in the 50 states and the District of Columbia for state fiscal year (FY) 2006. The data were collected through the State Library Agencies (StLA) Survey, the product of a cooperative effort…

  20. 78 FR 4838 - Applications for New Awards; Gaining Early Awareness and Readiness for Undergraduate Programs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... Project. Notice inviting applications for new awards for fiscal year (FY) 2013. Catalog of Federal.... Absolute Priorities: For FY 2013 and any subsequent year in which we make awards from the list of unfunded...; that is, all funds needed for grantees to fully implement the project for its five or six year duration...

  1. 78 FR 48233 - Medicare Program; FY 2014 Hospice Wage Index and Payment Rate Update; Hospice Quality Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Contents I. Executive Summary A. Purpose B. Summary of the Major Provisions C. Summary of Costs, Benefits, and Transfers II. Background A. Hospice Care B. History of the Medicare Hospice Benefit C. Services... IV.C.3. We also update the FY 2014 hospice wage index with more current wage data, and the BNAF will...

  2. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    DTIC Science & Technology

    2008-08-21

    upgrades, and to include several factors (including political, security, social environment, and best ways to engage local populations) in designing...demonstrated a strong commitment to political, economic, and social reforms. The President initially promised $5 billion annually by FY2006...services, including Cantonese , Ukrainian, Tibetan, Portuguese to Africa, Romanian, and Kazakh, as well as broadcasts in Hindi, Russian, English

  3. 76 FR 15991 - HUD's Fiscal Year (FY) 2010 NOFA for the Self-Help Homeownership Opportunity Program (SHOP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-C-34] HUD's Fiscal Year (FY) 2010... nonprofit organizations under federal or state law. This Notice also corrects sections in the NOFA that...Logic Model form HUD 96010 SHOP V12.3 012811. The coding in the form originally posted did not allow the...

  4. The Effects of Military Advertising: Evidence from the Advertising Mix Test

    DTIC Science & Technology

    1989-03-01

    services with monthly infornation on contracts, recruiters, quotas, market characteristics, and advertising expenditures. First, advertising programs...Demographic market data: ADI averages for FY 84 ......................... 25 B.3. DoD advertising mix data: ADI averages, FY 84...data were available with all the requisite goal and advertising information. Detailed information on market demographics were not available, nor were

  5. Genome-wide association study for identifying loci that affect fillet yield, carcass, and body weight traits in rainbow trout (Oncorhynchus mykiss)

    USDA-ARS?s Scientific Manuscript database

    Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that affects production efficiency. Despite that, FY has not received much attention in breeding programs because it is difficult to measure on a large number of fish and it cannot be directly measured on breeding c...

  6. 75 FR 4824 - Agency Information Collection Activities; Proposed Collection; Comment Request; State Program Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... reporting year and thereafter, while the current reporting, OMB Approval Number 0985-0008, will be extended to the end of the FY 2010 reporting cycle. The proposed FY 2011 version may be found on the AoA Web site link entitled Draft State Reporting Tool for Review available at http://www.aoa.gov/AoARoot...

  7. FY2011 Engineering Innovations, Research, and Technology Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, Kip; Martz, Harry E.; Poyneer, Lisa A.

    2012-04-24

    This report summarizes key research, development, and technology advancements in Lawrence Livermore National Laboratory’s Engineering Directorate for FY2011. These efforts exemplify Engineering’s nearly 60-year history of developing and applying the technology innovations needed for the Laboratory’s national security missions, and embody Engineering’s mission to “Enable program success today and ensure the Laboratory’s vitality tomorrow.

  8. 75 FR 34611 - Medicare Program; Supplemental Proposed Changes to the Hospital Inpatient Prospective Payment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... the out-migration adjustment values presented in the May 4, 2010 FY 2011 IPPS/LTCH PPS proposed rule and that the out-migration adjustment values in revised Table 4J are based on corrected wage data as... 31049 through 31057 in Table 4J.--Proposed Out-Migration Adjustment for Acute Care Hospitals--FY 2011...

  9. 2013 Los Alamos National Laboratory Hazardous Waste Minimization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzman, Sonja L.; English, Charles J.

    2015-08-24

    Waste minimization and pollution prevention are inherent goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE) and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program (a component of the overall Waste Minimization/Pollution Prevention [WMin/PP] Program) administered by the Environmentalmore » Stewardship Group (ENV-ES). This report also supports the waste minimization and pollution prevention goals of the Environmental Programs Directorate (EP) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. LANS was very successful in fiscal year (FY) 2013 (October 1-September 30) in WMin/PP efforts. Staff funded four projects specifically related to reduction of waste with hazardous constituents, and LANS won four national awards for pollution prevention efforts from the National Nuclear Security Administration (NNSA). In FY13, there was no hazardous, mixedtransuranic (MTRU), or mixed low-level (MLLW) remediation waste generated at the Laboratory. More hazardous waste, MTRU waste, and MLLW was generated in FY13 than in FY12, and the majority of the increase was related to MTRU processing or lab cleanouts. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less

  10. 1998 statistical summaries : Federal Transit Administration : grant assistance programs

    DOT National Transportation Integrated Search

    1999-03-01

    The 1998 Statistical Summaries provides information about the Federal Transit Administration's (FTA) major financial aid programs for Federal Fiscal Year (FY) 1998. The report covers the following programs: Urbanized Area Formula, Non-urbanized Area ...

  11. 75 FR 16142 - FY 2010 Special Diabetes Program for Indians Community-Directed Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... older had diagnosed diabetes (unpublished IHS Diabetes Program Statistics, 2006) compared to 7.8% for... the delinquency is attributable to the failure of the grantee organization or the individual...

  12. Southwestern willow flycatchers (Empidonax traillii extimus) in a grazed landscape: factors influencing brood parasitism

    Treesearch

    Katherine M. Brodhead; Scott H. Stoleson; Deborah M. Finch

    2007-01-01

    Brood parasitism by Brown-headed Cowbirds (Molothrus ater; hereafter "cowbirds") is an important factor contributing to the endangered status of the Southwestern Willow Flycatcher (Empidonax traillii extimus, hereafter "flycatcher"). We report on factors that influence brood parasitism on the flycatcher using...

  13. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  14. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  15. Network Speech Systems Technology Program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1980-09-01

    This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.

  16. Space Launch System Advanced Development Office, FY 2013 Annual Report

    NASA Technical Reports Server (NTRS)

    Crumbly, C. M.; Bickley, F. P.; Hueter, U.

    2013-01-01

    The Advanced Development Office (ADO), part of the Space Launch System (SLS) program, provides SLS with the advanced development needed to evolve the vehicle from an initial Block 1 payload capability of 70 metric tons (t) to an eventual capability Block 2 of 130 t, with intermediary evolution options possible. ADO takes existing technologies and matures them to the point that insertion into the mainline program minimizes risk. The ADO portfolio of tasks covers a broad range of technical developmental activities. The ADO portfolio supports the development of advanced boosters, upper stages, and other advanced development activities benefiting the SLS program. A total of 34 separate tasks were funded by ADO in FY 2013.

  17. U.S. Geological Survey federal-state cooperative water-resources program, fiscal year 1995

    USGS Publications Warehouse

    Lew, Melvin; Dodds, Betty

    1996-01-01

    The Federal-State Cooperative Program is a major U.S. Geological Survey (USGS) activity for the collection, analysis, and reporting of information on the quantity, quality, and use of the Nation's water resources. The fundamental characteristic of the program is that most of the work is undertaken by the USGS through joint-funding agreements, with State, regional, and local agencies providing at least one-half the funds. The main objectives of the program are (1) to collect, on a systematic basis, data needed for the continuing determi- nation and evaluation of the quantity, quality, and use of the Nation's water resources; and (2) to appraise the availability and the physical, chemical, and biological characteristics of surface and ground water through data analysis and interpretive water-resources investigations and research. During fiscal year (FY) 1995, Cooperative Program activities were underway in offices in every State, Puerto Rico, and several territories in concert with about 1,100 cooperating agencies. In FY 1995, Federal funding of $62.1 million as matched by cooperating agencies, which also provided more than $28.2 million unmatched for a total program of about $152 million. This amounted to nearly 38 percent of the total funds for the USGS's water-resources activities. This report presents examples of FY 1995 investigations, as well as information on hydrologic data collection and water-use activities.

  18. U.S. Geological Survey Federal-State Cooperative Water-Resources Program fiscal year 1994

    USGS Publications Warehouse

    Gilbert, Bruce K.

    1995-01-01

    The Federal-State Cooperative Program is a major U.S. Geological Survey (USGS) activity for the collection, analysis, and reporting of information on the quantity, quality, and use of the Nation's water resources. The fundamental characteristic of the program is that most of the work is undertaken by the USGS through joint-funding agreements, with State, regional, and local agencies providing at least one-half the funds. The main objectives of the program are (1) to collect, on a systematic basis, data needed for the continuing determination and evaluation of the quantity, quality, and use of the Nation's water resources; and (2) to appraise the availability and the physical, chemical, and biological characteristics of surface and ground water through data analysis and interpretive water-resources investigations and research. During fiscal year (FY)1994, Cooperative Program activities were underway in offices in every State, Puerto Rico, and several territories in concert with about 1,100 cooperating agencies. In FY 1994, Federal funding of $63.5 million was matched by cooperating agencies, which also provided more than $25 million unmatched for a total program of about $152 million. This amounted to nearly 40 percent of the total funds for the USGS's water-resources activities. This report presents examples of FY 1994 investigations, as well as updated information on hydrologic data collection activities.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnold H. Kritz

    PTRANSP, which is the predictive version of the TRANSP code, was developed in a collaborative effort involving the Princeton Plasma Physics Laboratory, General Atomics Corporation, Lawrence Livermore National Laboratory, and Lehigh University. The PTRANSP/TRANSP suite of codes is the premier integrated tokamak modeling software in the United States. A production service for PTRANSP/TRANSP simulations is maintained at the Princeton Plasma Physics Laboratory; the server has a simple command line client interface and is subscribed to by about 100 researchers from tokamak projects in the US, Europe, and Asia. This service produced nearly 13000 PTRANSP/TRANSP simulations in the four year periodmore » FY 2005 through FY 2008. Major archives of TRANSP results are maintained at PPPL, MIT, General Atomics, and JET. Recent utilization, counting experimental analysis simulations as well as predictive simulations, more than doubled from slightly over 2000 simulations per year in FY 2005 and FY 2006 to over 4300 simulations per year in FY 2007 and FY 2008. PTRANSP predictive simulations applied to ITER increased eight fold from 30 simulations per year in FY 2005 and FY 2006 to 240 simulations per year in FY 2007 and FY 2008, accounting for more than half of combined PTRANSP/TRANSP service CPU resource utilization in FY 2008. PTRANSP studies focused on ITER played a key role in journal articles. Examples of validation studies carried out for momentum transport in PTRANSP simulations were presented at the 2008 IAEA conference. The increase in number of PTRANSP simulations has continued (more than 7000 TRANSP/PTRANSP simulations in 2010) and results of PTRANSP simulations appear in conference proceedings, for example the 2010 IAEA conference, and in peer reviewed papers. PTRANSP provides a bridge to the Fusion Simulation Program (FSP) and to the future of integrated modeling. Through years of widespread usage, each of the many parts of the PTRANSP suite of codes has been thoroughly validated against experimental data and benchmarked against other codes. At the same time, architectural modernizations are improving the modularity of the PTRANSP code base. The NUBEAM neutral beam and fusion products fast ion model, the Plasma State data repository (developed originally in the SWIM SciDAC project and adapted for use in PTRANSP), and other components are already shared with the SWIM, FACETS, and CPES SciDAC FSP prototype projects. Thus, the PTRANSP code is already serving as a bridge between our present integrated modeling capability and future capability. As the Fusion Simulation Program builds toward the facility currently available in the PTRANSP suite of codes, early versions of the FSP core plasma model will need to be benchmarked against the PTRANSP simulations. This will be necessary to build user confidence in FSP, but this benchmarking can only be done if PTRANSP itself is maintained and developed.« less

  20. Separations and Waste Forms Research and Development FY 2013 Accomplishments Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Separations and Waste Form Campaign (SWFC) under the U.S. Department of Energy (DOE) Fuel Cycle Research and Development Program (FCRD) is responsible for developing advanced separation and waste form technologies to support the various fuel cycle options defined in the DOE Nuclear Energy Research and Development Roadmap, Report to Congress, April 2010. The fiscal year (FY) 2013 accomplishments report provides a highlight of the results of the research and development (R&D) efforts performed within SWFC in FY 2013. Each section contains a high-level overview of the activities, results, technical point of contact, applicable references, and documents produced during themore » fiscal year. This report briefly outlines campaign management and integration activities, but the intent of the report is to highlight the many technical accomplishments made during FY 2013.« less

  1. Region 9 Tribal Environmental GAP Funding

    EPA Pesticide Factsheets

    EPA Region 9 invites Indian Environmental General Assistance Program (GAP) grant proposals from federally recognized tribal governments and eligible intertribal consortia for FY2019 work plan program development activities.

  2. Brood removal influences fall of Varroa destructor (Mesostigmata: Varroidae) in honey bee (Hymenoptera: Apidae) colonies

    USDA-ARS?s Scientific Manuscript database

    The hygienic removal of brood infested with Varroa destructor by Apis mellifera disrupts the reproduction of the infesting mites and exposes the foundress mites to potential removal from the colony by grooming. Using brood deliberately infested with marked Varroa, we investigated the association bet...

  3. Rumination, Social Problem Solving and Suicide Intent Among Egyptians With a Recent Suicide Attempt.

    PubMed

    Sharaf, Amira Y; Lachine, Ola A; Thompson, Elaine A

    2018-02-01

    The more complex influences of social problem-solving abilities and rumination-specifically brooding and reflection-on suicide intent is not well understood. We hypothesized that social problem solving would moderate the association between reflection and suicide intent, and mediate the influence of brooding on suicide intent. A convenience sample (N=186) of individuals hospitalized for recent suicide attempt was interviewed, assessing suicide intent, social problem solving, brooding, reflection and depression. Brooding and reflection were positively associated with suicide intent. The mediating, but not the moderating, hypothesis was supported. Brooding was not significant (β=0.15, t=1.92, p=0.06) with social problem solving controlled. Interventions to disengage rumination and improve social problem-solving skills are underscored. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Mobbing and sitting tight at the nest as methods of avoiding brood parasitism

    PubMed Central

    Rands, Sean A.

    2012-01-01

    The arms race between brood parasites and their hosts has led to many different host behaviours for avoiding parasitism. Some of these behaviours are social, and require the presence of conspecifics to work effectively: in response to alarm calls, some species engage in mobbing behaviour where neighbours join nest tenants in attacking and repelling an invading brood parasite. There are risks involved for the neighbours, but it has been demonstrated that social mobbing allows individuals to learn about the presence of brood parasites in the environment, suggesting that social learning is occurring. Here, I consider whether using social signals to alert naive individuals to the presence of brood parasites is a suitable strategy, compared with sitting tight on the nest in response to the signal (which should reduce the chances of being parasitized). I also compare the efficiency of these strategies with the case where individuals fail to change behaviour in response a brood parasite. Using an individual-based simulation model, I demonstrate that both mobbing and sitting tight are effective strategies in response to a signal, and that mobbing is more effective when the chances of being parasitized increase. These results are discussed and compared with known host–brood parasite relationships. PMID:23565334

  5. Odorant cues linked to social immunity induce lateralized antenna stimulation in honey bees (Apis mellifera L.).

    PubMed

    McAfee, Alison; Collins, Troy F; Madilao, Lufiani L; Foster, Leonard J

    2017-04-07

    Hygienic behaviour (HB) is a social immunity trait in honey bees (Apis mellifera L.) whereby workers detect, uncap and remove unhealthy brood, improving disease resistance in the colony. This is clearly economically valuable; however, the molecular mechanism behind it is not well understood. The freeze-killed brood (FKB) assay is the conventional method of HB selection, so we compared odour profiles of FKB and live brood to find candidate HB-inducing odours. Surprisingly, we found that significantly more brood pheromone (β-ocimene) was released from FKB. β-ocimene abundance also positively correlated with HB, suggesting there could be a brood effect contributing to overall hygiene. Furthermore, we found that β-ocimene stimulated worker antennae in a dose-dependent manner, with the left antennae responding significantly stronger than right antennae in hygienic bees, but not in non-hygienic bees. Five other unidentifiable compounds were differentially emitted from FKB which could also be important for HB. We also compared odour profiles of Varroa-infested brood to healthy brood and found an overall interactive effect between developmental stage and infestation, but specific odours did not drive these differences. Overall, the data we present here is an important foundation on which to build our understanding the molecular mechanism behind this complex behaviour.

  6. Comparative anatomical study of internal brooding in three anascan bryozoans (Cheilostomata) and its taxonomic and evolutionary implications.

    PubMed

    Ostrovsky, Andrew N; Grischenko, Andrei V; Taylor, Paul D; Bock, Phil; Mawatari, Shunsuke F

    2006-06-01

    The anatomical structure of internal sacs for embryonic incubation was studied using SEM and light microscopy in three cheilostome bryozoans-Nematoflustra flagellata (Waters,1904), Gontarella sp., and Biflustra perfragilis MacGillivray, 1881. In all these species the brood sac is located in the distal half of the maternal (egg-producing) autozooid, being a conspicuous invagination of the body wall. It consists of the main chamber and a passage (neck) to the outside that opens independently of the introvert. There are several groups of muscles attached to the thin walls of the brood sac and possibly expanding it during oviposition and larval release. Polypide recycling begins after oviposition in Gontarella sp., and the new polypide bud is formed by the beginning of incubation. Similarly, polypides in brooding zooids degenerate in N. flagellata and, sometimes, in B. perfragilis. In the evolution of brood chambers in the Cheilostomata, such internal sacs for embryonic incubation are considered a final step, being the result of immersion of the brooding cavity into the maternal zooid and reduction of the protecting fold (ooecium). Possible reasons for this transformation are discussed, and the hypothesis of Santagata and Banta (Santagata and Banta1996) that internal brooding evolved prior to incubation in ovicells is rejected. J. Morphol. (c) 2006 Wiley-Liss, Inc.

  7. Ruminative subtypes and impulsivity in risk for suicidal behavior.

    PubMed

    Valderrama, Jorge; Miranda, Regina; Jeglic, Elizabeth

    2016-02-28

    Rumination has been previously linked to negative psychological outcomes, including depression and suicidal behavior. However, there has been conflicting research on whether or not two different subtypes of rumination - brooding and reflection - are more or less maladaptive. The present research sought to (1) examine whether individuals high in brooding but lower in reflection would show higher trait and behavioral impulsivity, relative to individuals low in brooding and low in reflection; and (2) examine impulsivity as a mediator of the relation between ruminative subtypes and suicidal ideation. In Study 1, participants (N=78) were recruited based on high, average, and low scores on a measure of brooding and reflective rumination. Individuals who scored high in brooding and average in reflection scored significantly higher in negative urgency, that is, in the tendency to act rashly in an attempt to reduce negative affect, than did those who scored low in brooding and low in reflection. Study 2 (N=1638) examined the relationship between ruminative subtypes, impulsivity, and suicide risk. We found an indirect relationship between brooding and suicide risk through lack of premeditation and lack of perseverance, independently of reflection. These findings are discussed in relation to cognitive risk for suicide. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  8. Trade-off between mating opportunities and parental care: brood desertion by female Kentish plovers.

    PubMed

    Székely, T; Cuthill, I C

    2000-10-22

    Why do some parents care for their young whereas others divorce from their mate and abandon their offspring? This decision is governed by the trade-off between the value of the current breeding event and future breeding prospects. In the precocial Kentish plover Charadrius alexandrinus females frequently, but not always, abandon their broods to be cared for by their mate, and seek new breeding partners within the same season. We have shown previously that females' remating opportunities decline with date in the season, so brood desertion should be particularly favourable for early breeding females. However, the benefits are tempered by the fact that single-parent families have lower survival expectancies than those where the female remains to help the male care for the young. We therefore tested the prediction that increasing the value of the current brood (by brood-size manipulation) should increase the duration of female care early in the season, but that in late breeders, with reduced remating opportunities, desertion and thus the duration of female care should be independent of current brood size. These predictions were fulfilled, indicating that seasonally modulated trade-offs between current brood value and remating opportunities can be important in the desertion decisions of species with flexible patterns of parental care.

  9. Trade-off between mating opportunities and parental care: brood desertion by female Kentish plovers.

    PubMed Central

    Székely, T; Cuthill, I C

    2000-01-01

    Why do some parents care for their young whereas others divorce from their mate and abandon their offspring? This decision is governed by the trade-off between the value of the current breeding event and future breeding prospects. In the precocial Kentish plover Charadrius alexandrinus females frequently, but not always, abandon their broods to be cared for by their mate, and seek new breeding partners within the same season. We have shown previously that females' remating opportunities decline with date in the season, so brood desertion should be particularly favourable for early breeding females. However, the benefits are tempered by the fact that single-parent families have lower survival expectancies than those where the female remains to help the male care for the young. We therefore tested the prediction that increasing the value of the current brood (by brood-size manipulation) should increase the duration of female care early in the season, but that in late breeders, with reduced remating opportunities, desertion and thus the duration of female care should be independent of current brood size. These predictions were fulfilled, indicating that seasonally modulated trade-offs between current brood value and remating opportunities can be important in the desertion decisions of species with flexible patterns of parental care. PMID:11416913

  10. Do geese fully develop brood patches? A histological analysis of lesser snow geese (Chen caerulescens caerulescens) and Ross's geese (C. rossii)

    USGS Publications Warehouse

    Jonsson, J.E.; Afton, A.D.; Homberger, D.G.; Henk, W.G.; Alisauskas, R.T.

    2006-01-01

    Most birds develop brood patches before incubation; epidermis and dermis in the brood patch region thicken, and the dermal connective tissue becomes increasingly vascularized and infiltrated by leukocytes. However, current dogma states that waterfowl incubate without modifications of skin within the brood patch region. The incubation periods of lesser snow geese (Chen caerulescens caerulescens; hereafter called snow geese) and Ross's geese (C. rossii) are 2-6 days shorter than those of other goose species; only females incubate. Thus, we hypothesized that such short incubation periods would require fully developed brood patches for sufficient heat transfer from incubating parents to eggs. We tested this hypothesis by analyzing the skin histology of abdominal regions of snow and Ross's geese collected at Karrak Lake, Nunavut, Canada. For female snow geese, we found that epidermis and dermis had thickened and vascularization of dermis was 14 times greater, on average, than that observed in males (n=5 pairs). Our results for Ross's geese (n=5 pairs) were more variable, wherein only one of five female Ross's geese fully developed a brood patch. Our results are consistent with three hypotheses about brood patch development and its relationship with different energetic cost-benefit relationships, resulting from differences in embryonic development and body size. ?? Springer-Verlag 2006.

  11. Baby Killers: Documentation and Evolution of Scuttle Fly (Diptera: Phoridae) Parasitism of Ant (Hymenoptera: Formicidae) Brood

    PubMed Central

    Brown, Brian V.; Hash, John M.; Porras, Wendy; Amorim, Dalton de Souza

    2017-01-01

    Abstract Background Numerous well-documented associations occur among species of scuttle flies (Diptera: Phoridae) and ants (Hymenoptera: Formicidae), but examples of brood parasitism are rare and the mechanisms of parasitism often remain unsubstantiated. New information We present two video-documented examples of ant brood (larvae and pupae) parasitism by scuttle flies. In footage from Estação Biológica de Boracéia in Brazil, adult females of Ceratoconus setipennis Borgmeier can be seen attacking workers of Linepithema humile (Mayr) species group while they are carrying brood, and ovipositing directly onto brood in the nest. In another remarkable example, footage from the Soltis Center, near Peñas Blancas in Costa Rica, shows adult females of an unidentified species of the Apocephalus grandipalpus Borgmeier group mounting Pheidole Westwood brood upside-down and ovipositing while the brood are being transported by workers. Analysis of evolutionary relationships (in preparation) among Apocephalus Coquillett species shows that this is a newly derived behavior within the genus, as the A. grandipalpus group arises within a group of adult ant parasitoids. In contrast, relationships of Ceratoconus Borgmeier have not been studied, and the lifestyles of the other species in the genus are largely unknown. PMID:28325980

  12. NCPV FY 1998 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R. D.; Hansen, A.

    1999-07-19

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership inmore » research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals.« less

  13. 75 FR 1389 - FY 2010 Special Diabetes Program for Indians Community-Directed Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... or older had diagnosed diabetes (unpublished IHS Diabetes Program Statistics, 2006) compared to 7.8... applies whether the delinquency is attributable to the failure of the grantee organization or the...

  14. FMCSA safety program effectiveness measurement : Roadside Intervention Effectiveness Model FY 2012, [analysis brief].

    DOT National Transportation Integrated Search

    2016-02-01

    Roadside Inspection and Traffic Enforcement are two of : the Federal Motor Carrier Safety Administrations : (FMCSAs) key safety programs. The Roadside : Inspection Program consists of roadside inspections : performed by qualified safety inspect...

  15. FMCSA safety program effectiveness measurement : roadside intervention effectiveness model FY 2011 : [analysis brief].

    DOT National Transportation Integrated Search

    2015-06-01

    Roadside Inspection and Traffic Enforcement are two of the Federal Motor Carrier Safety Administrations (FMCSAs) key safety programs. The Roadside Inspection program consists of roadside inspections performed by qualified safety inspectors. The...

  16. Medicare program; inpatient psychiatric facilities prospective payment system--update for fiscal year beginning October 1, 2014 (FY 2015). Final rule.

    PubMed

    2014-08-06

    This final rule will update the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs). These changes will be applicable to IPF discharges occurring during the fiscal year (FY) beginning October 1, 2014 through September 30, 2015. This final rule will also address implementation of ICD-10-CM and ICD-10-PCS codes; finalize a new methodology for updating the cost of living adjustment (COLA), and finalize new quality measures and reporting requirements under the IPF quality reporting program.

  17. Metal hydride reasearch and development program at Brookhaven National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, J.R.; Reilly, J.J.

    1978-01-01

    A progress report is presented covering work performed in the hydrogen materials development program at Brookhaven National Laboratory (BNL) for FY78 which encompasses the time period from October 1, 1977 through September 30, 1978. The subjects to be discussed here concern properties of importance in the utilization of metal hydrides as energy storage media. Most of the areas of research were initiated prior to FY78, however all of the results contained in this manuscript were obtained during the aforementioned period of time. The following subjects will be discussed: the properties of ferro-titanium and chrome-titanium alloy hydrides.

  18. Species richness and distributions of boreal waterbirds in relation to nesting and brood-rearing habitats

    USGS Publications Warehouse

    Lewis, Tyler L.; Lindberg, Mark S.; Schmutz, Joel A.; Bertram, Mark R.; Dubour, Adam J.

    2015-01-01

    Identification of ecological factors that drive animal distributions allows us to understand why distributions vary temporally and spatially, and to develop models to predict future changes to populations–vital tools for effective wildlife management and conservation. For waterbird broods in the boreal forest, distributions are likely driven by factors affecting quality of nesting and brood-rearing habitats, and the influence of these factors may extend beyond singles species, affecting the entire waterbird community. We used occupancy models to assess factors influencing species richness of waterbird broods on 72 boreal lakes, along with brood distributions of 3 species of conservation concern: lesser scaup (Aythya affinis), white-winged scoters (Melanitta fusca), and horned grebe (Podiceps auritus). Factors examined included abundance of invertebrate foods (Amphipoda, Diptera, Gastropoda, Hemiptera, Odonata), physical lake attributes (lake area, emergent vegetation), water chemistry (nitrogen, phosphorus, chlorophyll a concentrations), and nesting habitats (water edge, non-forest cover). Of the 5 invertebrates, only amphipod density was related to richness and occupancy, consistently having a large and positive relationship. Despite this importance to waterbirds, amphipods were the most patchily distributed invertebrate, with 17% of the study lakes containing 70% of collected amphipods. Lake area was the only other covariate that strongly and positively influenced species richness and occupancy of scaup, scoters, and grebes. All 3 water chemistry covariates, which provided alternative measures of lake productivity, were positively related to species richness but had little effect on scaup, scoter, and grebe occupancy. Conversely, emergent vegetation was negatively related to richness, reflecting avoidance of overgrown lakes by broods. Finally, nesting habitats had no influence on richness and occupancy, indicating that, at a broad spatial scale, brood distributions are largely driven by the presence of quality brood-rearing lakes, not nesting habitats. Our findings are relevant to generating conservation plans or management goals; specifically, boreal lakes with abundant amphipods and surface areas >25 ha are important habitat for waterbird broods and merit conservation, especially given the patchy distribution of amphipods. Moreover, these high quality brood-rearing lakes are much rarer, and thus more constraining, than are quality nesting habitats, which are likely abundant in the boreal.

  19. THE SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM; ANNUAL REPORT TO CONGRESS, FY 1998

    EPA Science Inventory

    This document summarizes the accomplishments and activities of the Superfund Innovative Technology Evaluation (SITE) Program for 1998. General information on the SITE program is presented. In addition, cost savings effected by the SITE program were estimated and are presented. ...

  20. NASA's Microgravity Research Program

    NASA Technical Reports Server (NTRS)

    Woodard, Dan R. (Editor); Henderson, Robin N. (Technical Monitor)

    2000-01-01

    The Fiscal Year 1999 Annual Report describes key elements of the NASA Microgravity Research Program. The Program's goals, approach taken to achieve those goals, and program resources are summarized. A review of the Program's status at the end of FY1999 and highlights of the ground-and-flight research are provided.

Top