Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
NASA Astrophysics Data System (ADS)
Zhou, Yong; Huang, You Zhen
2018-06-01
This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...
NASA Astrophysics Data System (ADS)
Venkrbec, Vaclav; Bittnerova, Lucie
2017-12-01
Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.
ERIC Educational Resources Information Center
BOICE, JOHN,; AND OTHERS
ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…
B-WEST Regional Workforce Training Center. Building Workers Entering Skilled Trades. Final Report.
ERIC Educational Resources Information Center
Portland Community Coll., OR.
The B-WEST (Building Workers Entering Skilled Trades) project was an 18-month demonstration project at a campus of Portland Community College (Oregon). During the B-WEST project, the following programs/components were developed: (1) a model building construction (electrical, mechanical, construction) trades program for unemployed and underemployed…
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
Data Policy Construction Set - Building Blocks from Childhood Constructions
NASA Astrophysics Data System (ADS)
Fleischer, Dirk; Paul-Stueve, Thilo; Jobmann, Alexandra; Farrenkopf, Stefan
2016-04-01
A complete construction set of building blocks usually comes with instructions and these instruction include building stages. The products of these building stages usually build from very general parts become highly specialized building parts for very unique features of the whole construction model. This sounds very much like the construction or organization of an interdisciplinary research project, institution or association, doesn't it! The creation process of an overarching data policy for a project group or institution is exactly the combination of individual interests with the common goal of a collaborative data policy and can be compared with the building stages of a construction set of building blocks and the building instructions. Keeping this in mind we created the data policy construction set of textual building blocks. This construction set is subdivided into several building stages or parts each containing multiple building blocks as text blocks. By combining building blocks of all subdivisions it is supposed to create a cascading data policy document. Cascading from the top level as a construction set provider for all further down existing levels such as project, themes, work packages or Universities, faculties, institutes down to the working level of working groups. The working groups are picking from the remaining building blocks in the provided construction set the suitable blocks for its working procedures to create a very specific policy from the available construction set provided by the top level community. Nevertheless, if a working group realized that there are missing building blocks or worse that there are missing building parts, then they have the chance to add the missing pieces to the construction set of direct an future use. This cascading approach enables project or institution wide application of the encoded rules from the textual level on access to data storage infrastructure. This structured approach is flexible enough to allow for the fact that interdisciplinary research projects always bring together very diverse amount of working habits, methods and requirements. All these need to be considered for the creation of the general document on data sharing and research data management. This approach focused on the recommendation of the RDA practical policy working group to implement practical policies derived from the textual level. Therefore it aims to move the data policy creation procedure and implementation towards the consortium or institutional formation with all the benefits of an existing data policy construction set already during the proposal creation and proposal review. Picking up the metaphor of real building blocks in context of data policies provides also the insight that existing building blocks and building parts can be reused as they are, but also can be redesigned with very little changes or a full overhaul.
NASA Astrophysics Data System (ADS)
Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul
2018-03-01
In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
ERIC Educational Resources Information Center
Graham, Charles W.; Geva, Anat
2001-01-01
An interdisciplinary studio project involved architecture and construction students. Evaluation of the integrated studio experience found that it gave students an accurate picture of professional practice. Architecture students were made more aware of building materials, construction technology, and cost; construction science students better…
A profile of wood use in nonresidential building construction
H. N. Spelter; R. G. Anderson
This report presents estimates of the amounts of lumber, glued-laminated lumber, trusses, plywood, particleboard, hardboard, and wood shingles used in new nonresidential building construction in the United States. Use of wood products is shown for several building types, project sizes, and building components. The estimates are based on a survey of 489 projects under...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
NASA Astrophysics Data System (ADS)
Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya
2017-12-01
Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
1991 survey of recent health sciences library building projects.
Ludwig, L T
1992-01-01
Twenty health sciences libraries reported building planning, expansion, or construction of new facilities in the association's second annual survey of recent building projects. Six projects are new, freestanding structures in which the library occupies all or a major portion of the space. Six other projects are part of new construction for separately administered units in which the library is a major tenant. The final eight projects involve additions to or renovations of existing space. Seven of these twenty libraries were still in projected, predesign, or design stages of awaiting funding approval; of those seven, five were not prepared to release the requested information. Six projects are reported here as illustrative of current building projects. Images PMID:1600420
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
Application of BIM Technology in Prefabricated Buildings
NASA Astrophysics Data System (ADS)
Zhanglin, Guo; Si, Gao; Jun-e, Liu
2017-08-01
The development of fabricated buildings has become the main trend of the developm ent of modern construction industry in China. As the main tool of building information, BIM (b uilding information modeling) has greatly promoted the development of construction industry. Based on the review of the papers about the fabricated buildings and BIM technology in recent years, this paper analyzes the advantages of fabricated buildings and BIM technology, then exp lores the application of BIM technology in fabricated buildings. It aims to realize the rationaliz ation and scientification of project lifecycle management in fabricated construction project, and finally form a coherent information platform in the fabricated building.
Bai, Xiao-ping; Zhang, Xi-wei
2013-01-01
Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scheib, J.; Pless, S.; Torcellini, P.
NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less
Critical success factors in infrastructure projects
NASA Astrophysics Data System (ADS)
Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto
2017-11-01
Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.
The project is an integrative educational and research project that will revolutionize design and construction methods towards more sustainable buildings. The project will develop and test new product design concepts using bio-composite materials in load-bearing and fa&cced...
Research Progress of Building Materials Used in Construction Land
NASA Astrophysics Data System (ADS)
Niu, Yan
2018-01-01
Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.
23 CFR 710.313 - Design-build projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build..., the STD shall ensure that right-of-way is available prior to the start of physical construction on...
23 CFR 710.313 - Design-build projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Design-build projects. 710.313 Section 710.313 Highways... REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build..., the STD shall ensure that right-of-way is available prior to the start of physical construction on...
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
Project Management Life Cycle Models to Improve Management in High-rise Construction
NASA Astrophysics Data System (ADS)
Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana
2018-03-01
The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-09-01
Momentum behind zero energy building design and construction is increasing, presenting a tremendous opportunity for advancing energy performance in the commercial building industry. At the same time, there is a lingering perception that zero energy buildings must be cost prohibitive or limited to showcase projects. Fortunately, an increasing number of projects are demonstrating that high performance can be achieved within typical budgets. This factsheet highlights replicable, recommended strategies for achieving high performance on a budget, based on experiences from past projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract will require the construction of a multi-story office building, the prospective bidder/offeror..., etc.) Complexity: (office building, etc.) Type of construction: Value of project: If the prospective... (P.L. 99-399; 22 U.S.C. 4852). The Act limits certain construction projects abroad to United States...
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana
2014-11-01
Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.
ERIC Educational Resources Information Center
Agron, Joe
1998-01-01
Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…
Research on construction quality and improvement of assembly construction
NASA Astrophysics Data System (ADS)
Cheng, Fei
2017-11-01
Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.
Development of high-rise buildings: digitalization of life cycle management
NASA Astrophysics Data System (ADS)
Gusakova, Elena
2018-03-01
The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
Selecting the Right Construction Delivery Method for a Specific Project.
ERIC Educational Resources Information Center
Klinger, Jeff; Booth, Scott
2002-01-01
Discusses the costs and benefits of various construction delivery methods for higher education facility projects, including the traditional lump sum general contracting approach (also known as design/bid/build); design-build; and, in the case of private institutions, guaranteed maximum pricing offered by those firms willing to perform construction…
Community involvement in constructing village health buildings in Uganda and Sierra Leone.
Mitchell, M
1995-11-01
Three public health projects in Uganda and Sierra Leone are used to illustrate a new approach to construction of health buildings in villages. Emphasis is placed on community involvement. The health projects were comprehensive and relied on health education, employment of local village health workers, and establishment of village health committees. The objective of community involvement was described as encouragement of people to change their own diets and living conditions. This approach to primary health care is considered to be a strong basis for sustainable social development. Each of the three communities initiated the building projects slightly differently. There was a range of structures: traditional meeting halls, simple rooms with imported materials and a pit latrine, new buildings combining local and imported materials and labor, new nontraditional buildings, rehabilitated existing nontraditional buildings with imported labor and materials, and temporary mobile clinics. Community involvement was at different levels. All three projects were the result of a combined effort of national governments or mission hospitals, nongovernmental organizations, and the host community. The following should be considered before beginning construction: a suitable site, appropriate staff accommodation, the likely motivation of the host community, seasonality, local materials available, availability of skilled labor, and design. A plan of work during construction should include a building design, site supervision, transportation of local and non-local materials, unskilled labor, and skilled labor. Village health committees with or without government help would be responsible for maintenance of buildings after construction. A key feature of this approach is the assessment of the community's ability and capacity to contribute.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
Human Health Science Building Geothermal Heat Pump Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leidel, James
2014-12-22
The grant objectives of the DOE grant funded project have been successfully completed. The Human Health Building (HHB) was constructed and opened for occupancy for the Fall 2012 semester of Oakland University. As with any large construction project, some issues arose which all were overcome to deliver the project on budget and on time. The facility design is a geothermal / solar-thermal hybrid building utilizing both desiccant dehumidification and variable refrigerant flow heat pumps. It is a cooling dominant building with a 400 ton cooling design day load, and 150 ton heating load on a design day. A 256 verticalmore » borehole (320 ft depth) ground source heat pump array is located south of the building under the existing parking lot. The temperature swing and performance over 2013 through 2015 shows the ground loop is well sized, and may even have excess capacity for a future building to the north (planned lab facility). The HHB achieve a US Green Building Counsel LEED Platinum rating by collecting 52 of the total 69 available LEED points for the New Construction v.2 scoring checklist. Being Oakland's first geothermal project, we were very pleased with the building outcome and performance with the energy consumption approximately 1/2 of the campus average facility, on a square foot basis.« less
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on school building design issues, such as the fundamentals of good design and designs that accommodate change, issues affecting…
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Design/build project grants. 35.2036 Section 35.2036 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build project grants. (a) Terms and conditions. The...
Synthetic building materials for transport buildings and structures
NASA Astrophysics Data System (ADS)
Gerasimova, Vera
2017-10-01
The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
1984-02-01
REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurnik, Charles W.; Keates, Steven
This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) or packages of measures where evaluators can analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol (IPMVP).
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
NASA Astrophysics Data System (ADS)
Marhani, M. A.; Muksain, M. A. S.
2018-02-01
Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
School Building Projects: Managing Insurance and Contracts during Construction
ERIC Educational Resources Information Center
Shands, Richard
2011-01-01
Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…
ERIC Educational Resources Information Center
Dolan, Thomas G.
2003-01-01
Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)
Utilization of building information modeling in infrastructure’s design and construction
NASA Astrophysics Data System (ADS)
Zak, Josef; Macadam, Helen
2017-09-01
Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.
Socioecological Aspects of High-rise Construction
NASA Astrophysics Data System (ADS)
Eichner, Michael; Ivanova, Zinaida
2018-03-01
In this article, the authors consider the socioecological problems that arise in the construction and operation of high-rise buildings. They study different points of view on high-rise construction and note that the approaches to this problem are very different. They also analyse projects of modern architects and which attempts are made to overcome negative impacts on nature and mankind. The article contains materials of sociological research, confirming the ambivalent attitude of urban population to high-rise buildings. In addition, one of the author's sociological survey reveals the level of environmental preparedness of the university students, studying in the field of "Construction of unique buildings and structures", raising the question of how future specialists are ready to take into account socioecological problems. Conclusion of the authors: the construction of high-rise buildings is associated with huge social and environmental risks, negative impact on the biosphere and human health. This requires deepened skills about sustainable design methods and environmental friendly construction technologies of future specialists. Professor M. Eichner presents in the article his case study project results on implementation of holistic eco-sustainable construction principles for mixed-use high-rise building in the metropolis of Cairo.
78 FR 18560 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... approved collection for forms C-700, Private Construction Projects; C-700 (R), Multi-family Residential... private companies or individuals, private multi-family residential buildings, and on building projects... sample basis from federal, state and local agency officials, owners of private nonresidential projects...
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...
NASA Astrophysics Data System (ADS)
Orlov, Alexandr; Chubarkina, Irina
2018-03-01
The paper is dedicated to main modern trends in the area of high-rise construction. The classification of buildings and structures by height is given. Functional distribution by the height of buildings is presented. A review of positive and negative aspects of high-rise construction from the economic point of view is given. On the basis of the data obtained, it is proposed to build up residential microdistricts in the form of urban blocks. A plan of microdistricts development is presented. It takes into account urban blocks and includes their main characteristics. An economic and mathematical model was developed to carry out a comprehensive assessment of the effectiveness of high-rise construction projects.
Demystifying first-cost green building premiums in healthcare.
Houghton, Adele; Vittori, Gail; Guenther, Robin
2009-01-01
This study assesses the extent of "first-cost green building construction premiums" in the healthcare sector based on data submitted by and interviews with 13 current LEED-certified and LEED-registered healthcare project teams, coupled with a literature survey of articles on the topics of actual and perceived first-cost premiums associated with green building strategies. This analysis covers both perceived and realized costs across a range of projects in this sector, leading to the following conclusions: Construction first-cost premiums may be lower than is generally perceived, and they appear to be independent of both building size and level of "green" achievement; projects are using financial incentives and philanthropy to drive higher levels of achievement; premiums are decreasing over time; and projects are benefiting from improvements in health and productivity which, although difficult to monetize, are universally valued.
Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
NASA Astrophysics Data System (ADS)
Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.
2017-08-01
Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.
NASA Astrophysics Data System (ADS)
Wang, Li; Li, Chuanghong
2018-02-01
As a sustainable form of ecological structure, green building is widespread concerned and advocated in society increasingly nowadays. In the survey and design phase of preliminary project construction, carrying out the evaluation and selection of green building design scheme, which is in accordance with the scientific and reasonable evaluation index system, can improve the ecological benefits of green building projects largely and effectively. Based on the new Green Building Evaluation Standard which came into effect on January 1, 2015, the evaluation index system of green building design scheme is constructed taking into account the evaluation contents related to the green building design scheme. We organized experts who are experienced in construction scheme optimization to mark and determine the weight of each evaluation index through the AHP method. The correlation degree was calculated between each evaluation scheme and ideal scheme by using multilevel gray relational analysis model and then the optimal scheme was determined. The feasibility and practicability of the evaluation method are verified by introducing examples.
Commissioning School Construction Projects. IssueTrak: A CEFPI Brief on Educational Facility Issues
ERIC Educational Resources Information Center
Keithly, Peter
2005-01-01
This "IssueTrak" discusses an increasing interest in verifying the installation and performance of building systems prior to delivery and final acceptance by the building owner. This interest in quality assurance has spawned a new and distinct professional construction discipline referred to as building commissioning. The principal objective of…
Introduction of Building Information Modeling (BIM) Technologies in Construction
NASA Astrophysics Data System (ADS)
Milyutina, M. A.
2018-05-01
The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.
NASA Astrophysics Data System (ADS)
Schuster, J. C.
2017-08-01
The tablet-based software docu-tools digitize the documentation of buildings, simplifies construction and facility management and the data analysis in building and construction-history research. As a plan-based software, `pins' can be set to record data (images, audio, text etc.), each data point containing a time and date stamp. Once a pin is set and information recorded, it can never be deleted from the system, creating clear contentious-free documentation. Reports to any/all data recorded can immediately be generated through various templates in order to share, document, analyze and archive the information gathered. The software both digitizes building condition assessment, as well as simplifies the fully documented management and solving of problems and monitoring of a building. Used both in the construction industry and for documenting and analyzing historic buildings, docu-tools is a versatile and flexible tool that has become integral to my work as a building historian working on the conservation and curating of the historic built environment in Europe. I used the software at Boughton House, Northamptonshire, UK, during a one-year research project into the construction history of the building. The details of how docu-tools was used during this project will be discussed in this paper.
Manhattan Project buildings and facilities at the Hanford Site: A construction history
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerber, M.S.
1993-09-01
This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.
Commercial Buildings Partnerships - Overview of Higher education projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parrish, Kristen; Robinson, Alastair; Regnier, Cindy
2013-02-01
The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits aremore » designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leach, M.; Bonnema, E.; Pless, S.
2012-08-01
This paper helps owners' efficiency representatives to inform executive management, contract development, and project management staff as to how specifying and applying whole-building absolute energy use targets for new construction or renovation projects can improve the operational energy performance of commercial buildings.
A Proposal for the use of the Consortium Method in the Design-build system
NASA Astrophysics Data System (ADS)
Miyatake, Ichiro; Kudo, Masataka; Kawamata, Hiroyuki; Fueta, Toshiharu
In view of the necessity for efficient implementation of public works projects, it is expected to utilize advanced technical skills of private firms, for the purpose of reducing project costs, improving performance and functions of construction objects, and reducing work periods, etc. The design-build system is a method to order design and construction as a single contract, including design of structural forms and main specifications of the construction object. This is a system in which high techniques of private firms can be utilized, as a means to ensure qualities of design and construction, rational design, and efficiency of the project. The objective of this study is to examine the use of a method to form a consortium of civil engineering consultants and construction companies, as it is an issue related to the implementation of the design-build method. Furthermore, by studying various forms of consortiums to be introduced in future, it proposes procedural items required to utilize this method, during the bid and after signing a contract, such as the estimate submission from the civil engineering consultants etc.
The University of Michigan, Kellogg Building Expansion & Renovation, Ann Arbor, Michigan.
ERIC Educational Resources Information Center
Design Cost Data, 2001
2001-01-01
Presents design, construction, and cost data for the University of Michigan's Kellogg Building expansion and renovation project. A list of project manufacturers and suppliers is provided along with four photographs and four floor plans. (GR)
NASA Astrophysics Data System (ADS)
Sugandi, Machmud
2017-09-01
Implementation of the Prakerin subject in the field of Building Engineering study program in vocational high school (VHS) are facing many issues associated to non-compliance unit of work in the industry and the expected competencies in learning at school. Project Based Learning (PBL) is an appropriate model learning used for Prakerin subject to increase student competence as the extension of the Prakerin implementation in the construction industry services. Assignments based on the selected project during their practical industry work were given to be completed by student. VHS students in particular field of Building Engineering study program who has been completed Prakerin subject will have a better job readiness, and therefore they will have an understanding on the knowledge, skills, and attitudes and good vision on the construction project in accordance with their experience during Prakerin work in the industry.
Interdisciplinary Approach to Building Construction.
ERIC Educational Resources Information Center
Armstrong, Harry
The paper discusses the interdisciplinary approach used by the Amity High School House Construction Project to develop a construction cluster in a small high school, to give students on-the-job training, and to teach them the relevancy of academic education. The project's monthly plan of action is briefly described. Suggested activities,…
The Effect of School Building Renovation/Construction on School Culture
ERIC Educational Resources Information Center
Lesisko, Lee J.; Wright, Robert J.; O'Hern, Brenda
2010-01-01
School construction or renovation projects can have a profound affect on students, faculty and administration. The literature revealed that continuous communication is essential for a smooth process. This research identified bureaucratic issues and school climate to be leading factors of concern during construction projects. Analysis of this study…
Application of Updated Construction and Demolition Waste Reduction Policy to Army Projects
2015-12-01
goal of Net Zero waste disposal in landfills. Therefore, projects that involve the removal of existing buildings or structures are directed to...Therefore, projects that involve the removal of existing buildings or structures will evaluate the feasibility of deconstruction and salvage rather than...deconstruction. Therefore, needed new guidance must include consideration of the types of buildings and structures that do (and do not) lend
The report gives results of a new house evaluation of potential building design and construction for the control of radon in Marion and Alachua Counties, Florida. During the project, which began in March 1992, the construction of 14 new houses, built in accordance with the Draft ...
ERIC Educational Resources Information Center
Suwal, Sunil; Singh, Vishal
2018-01-01
Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused…
24 CFR 891.745 - Replacement reserve.
Code of Federal Regulations, 2012 CFR
2012-04-01
... section, total structures include main buildings, accessory buildings, garages, and other buildings. The... cost of the total structures (for new construction projects), 0.4 percent of the cost of the initial...
24 CFR 891.745 - Replacement reserve.
Code of Federal Regulations, 2014 CFR
2014-04-01
... section, total structures include main buildings, accessory buildings, garages, and other buildings. The... cost of the total structures (for new construction projects), 0.4 percent of the cost of the initial...
24 CFR 891.745 - Replacement reserve.
Code of Federal Regulations, 2011 CFR
2011-04-01
... section, total structures include main buildings, accessory buildings, garages, and other buildings. The... cost of the total structures (for new construction projects), 0.4 percent of the cost of the initial...
24 CFR 891.745 - Replacement reserve.
Code of Federal Regulations, 2013 CFR
2013-04-01
... section, total structures include main buildings, accessory buildings, garages, and other buildings. The... cost of the total structures (for new construction projects), 0.4 percent of the cost of the initial...
24 CFR 891.745 - Replacement reserve.
Code of Federal Regulations, 2010 CFR
2010-04-01
... section, total structures include main buildings, accessory buildings, garages, and other buildings. The... cost of the total structures (for new construction projects), 0.4 percent of the cost of the initial...
Optimizing Value and Avoiding Problems in Building Schools.
ERIC Educational Resources Information Center
Brevard County School Board, Cocoa, FL.
This report describes school design and construction delivery processes used by the School Board of Brevard County (Cocoa, Florida) that help optimize value, avoid problems, and eliminate the cost of maintaining a large facility staff. The project phases are examined from project definition through design to construction. Project delivery…
A Project to Design and Build Compact Heat Exchangers
ERIC Educational Resources Information Center
Davis, Richard A.
2005-01-01
Students designed and manufactured compact, shell-and-tube heat exchangers in a project-based learning exercise integrated with our heat transfer course. The heat exchangers were constructed from common building materials available at home improvement centers. The cost of materials for a device was less than $20. The project gave students…
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
Construction Sector (NAICS 23)
Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws
Space-planning and structural solutions of low-rise buildings: Optimal selection methods
NASA Astrophysics Data System (ADS)
Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander
2017-11-01
The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.
Evaluation of Safety, Quality and Productivity in Construction
NASA Astrophysics Data System (ADS)
Usmen, M. A.; Vilnitis, M.
2015-11-01
This paper examines the success indicators of construction projects, safety, quality and productivity, in terms of their implications and impacts during and after construction. First safety is considered during construction with a focus on hazard identification and the prevention of occupational accidents and injuries on worksites. The legislation mandating safety programs, training and compliance with safety standards is presented and discussed. Consideration of safety at the design stage is emphasized. Building safety and the roles of building codes in prevention of structural failures are also covered in the paper together with factors affecting building failures and methods for their prevention. Quality is introduced in the paper from the perspective of modern total quality management. Concepts of quality management, quality control, quality assurance and Six Sigma and how they relate to building quality and structural integrity are discussed with examples. Finally, productivity concepts are presented with emphasis on effective project management to minimize loss of productivity, complimented by lean construction and lean Six Sigma principles. The paper concludes by synthesizing the relationships between safety, quality and productivity.
ERIC Educational Resources Information Center
Delaware Univ., Newark. Coll. of Education.
This activity is designed for secondary school students. The process of constructing a model solar building includes consideration of many fundamental scientific principles, such as the nature of heat, light, electricity, and energy conversion technology. When the model solar building is completed, there are numerous possibilities for the use of…
Challenges in Construction Over Soft Soil - Case Studies in Malaysia
NASA Astrophysics Data System (ADS)
Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.
2016-07-01
Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.
Health sciences library building projects: 1994 survey.
Ludwig, L
1995-01-01
Designing and building new or renovated space is time consuming and requires politically sensitive discussions concerning a number of both long-term and immediate planning issues. The Medical Library Association's fourth annual survey of library building projects identified ten health sciences libraries that are planning, expanding, or constructing new facilities. Two projects are in predesign stages, four represent new construction, and four involve renovations to existing libraries. The Texas Medical Association Library, the King Faisal Specialist Hospital and Research Centre Library, and the Northwestern University Galter Health Sciences Library illustrate how these libraries are being designed for the future and take into account areas of change produced by new information technologies, curricular trends, and new ways to deliver library services. Images PMID:7599586
14 CFR 152.607 - Building design requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Building design requirements. 152.607... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Energy Conservation in Airport Aid Program § 152.607 Building design... or major building modification project proposed at the airport. The building design, construction...
77 FR 29537 - Community Facility Loans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... alternate contracting method projects must comply with the requirements for ``maximum open and free... of alternate construction contract methods (such as Design/Build and Construction Management) by the.... Further, these changes will give all applicants greater flexibility in developing projects. Therefore, a...
ERIC Educational Resources Information Center
Garlich, Michael; Tesinsky, Suzanne
2005-01-01
A first of its kind in the state of Florida, the Seminole Community College's Center for Building Construction was constructed as a partnership project between Seminole Community College, industry persons and the state of Florida. A training facility for students in the Construction Trades Apprenticeship Program, the building stands on the SCC…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-05-01
This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
A conceptual framework to development of construction safety culture in Indonesia
NASA Astrophysics Data System (ADS)
Armyn Machfudiyanto, Rossy; Latief, Yusuf
2017-12-01
Working accidents in the construction industry are among the highest in the world, affecting the three levels of both macro (National) mezzo (Enterprise) and micro (Projects) that need to be integrated in building a safety culture. The purpose of this research is to develop a conceptual framework in improving safety culture in the construction industry in Indonesia. The methodology was developed using literature study and deductive analysis which then performed expert validation to ensure the concept developed. The result of this research is that policy and institution as input to build safety culture which need to be followed up with increasing of company maturity which have implication to safety performance and construction project performance.
BLDG. 2 - PROJECT MANAGEMENT - PROGRESS PHOTO - CLEAR LAKE - MSC
1963-05-21
S63-06371 (1963) --- Construction continues on the Project Management facility, Building 2, at the Manned Spacecraft Center, some 25 miles southeast of the central business district of Houston, TX. The building's numerical designation was changed to Building 1 on June 28, 1974, and the center's name became the Johnson Space Center on Feb. 19, 1973. Photo credit: NASA
Study on construction technology of metro tunnel under a glass curtain wall
NASA Astrophysics Data System (ADS)
Zhang, Jian; Yu, Deqiang
2018-03-01
To ensure the safety of the glass curtain wall building above loess tunnel and get an optimal scheme, an elastic-plastic FEM model is established to simulate three reinforcement schemes based on a tunnel section in Xi’an Metro Line 3. The results show that the settlement value of the optimal scheme is reduced by 69.89% compared with the drainage measures, and the uneven settlement value is reduced by 57.5%. The construction points, technical processes and technical indexes of the optimal scheme are introduced. According to the actual project, the cumulative settlement of the building under construction is 16mm, which meets the control standards. According to the actual project, the cumulative settlement of the glass curtain wall building is 16mm, which meets the control standards. The reinforcement scheme can provide some reference for the design and construction of the metro in loess area.
A Spanish model for quantification and management of construction waste.
Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio
2009-09-01
Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.
ERIC Educational Resources Information Center
Henderson, William Edward, Jr.
Developed during a project designed to provide continuous, performance-based vocational training at the secondary and postsecondary levels, this instructional guide is intended to help teachers implement a laterally and vertically articulated secondary level building construction/carpentry program. Introductory materials include descriptions of…
Evaluation of Three Porous Pavement Systems in a Newly Constructed Parking Lot
This project examines porous pavement systems in a newly constructed parking lot next to Building 205 at the Edison Environmental Center. Porous pavement systems are one means of promoting environmental sustainability through stormwater runoff reduction. This project examines t...
2003-03-04
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
Analysis of Factors Influencing Building Refurbishment Project Performance
NASA Astrophysics Data System (ADS)
Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad
2018-03-01
Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.
Costs Climb on Materials for Schools: Construction Projects Delayed, Scrapped
ERIC Educational Resources Information Center
Sack, Joetta L.
2004-01-01
The rapidly rising cost of steel and other construction materials is forcing some districts that are building new schools to scramble for more money, delay work, or redesign projects. Nationwide, contractors and architects are finding it harder to give accurate estimates on projects, and some have even had to renegotiate contracts with districts.…
SIMPAVE : towards building interactive simulations for planning pavement construction
DOT National Transportation Integrated Search
2007-04-01
The goal of this project is to produce a software simulation that enables a user to manage a road construction project from the hot mix asphalt plant operation to the finished paved road. Throughout the simulation, the user is provided with the resou...
NASA Astrophysics Data System (ADS)
Seleznev, V. S.; Soloviev, V. M.; Emanov, A. F.
The paper is devoted to researches of influence of seismic actions for industrial and civil buildings and people. The seismic actions bring influence directly on the people (vibration actions, force shocks at earthquakes) or indirectly through various build- ings and the constructions and can be strong (be felt by people) and weak (be fixed by sensing devices). The great number of work is devoted to influence of violent seismic actions (first of all of earthquakes) on people and various constructions. This work is devoted to study weak, but long seismic actions on various buildings and people. There is a need to take into account seismic oscillations, acting on the territory, at construction of various buildings on urbanized territories. Essential influence, except for violent earthquakes, man-caused seismic actions: the explosions, seismic noise, emitted by plant facilities and moving transport, radiation from high-rise buildings and constructions under action of a wind, etc. can exert. Materials on increase of man- caused seismicity in a number of regions in Russia, which earlier were not seismic, are presented in the paper. Along with maps of seismic microzoning maps to be built indicating a variation of amplitude spectra of seismic noise within day, months, years. The presence of an information about amplitudes and frequencies of oscillations from possible earthquakes and man-caused oscillations in concrete regions allows carry- ing out soundly designing and construction of industrial and civil housing projects. The construction of buildings even in not seismically dangerous regions, which have one from resonance frequencies coincident on magnitude to frequency of oscillations, emitted in this place by man-caused objects, can end in failure of these buildings and heaviest consequences for the people. The practical examples of detail of engineering- seismological investigation of large industrial and civil housing projects of Siberia territory (hydro power stations, bridges, constructions, etc.) are given.
NASA Astrophysics Data System (ADS)
Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos
2016-08-01
Building Information Modelling (BIM) technology is already part of the construction industry and is considered by professionals as a very useful tool for all phases of a construction project. BIM technology, with the particularly useful 3D illustrations which it provides, can be used to illustrate and monitor the progress of works effectively through the entire lifetime of the project. Unmanned Aerial Vehicles (UAVs) have undergone significant advances in equipment capabilities and now have the capacity to acquire high resolution imagery from different angles in a cost effective and efficient manner. By using photogrammetry, characteristics such as distances, areas, volumes, elevations, object sizes, and object shape can be determined within overlapping areas. This paper explores the combined use of BIM and UAV technologies in order to achieve efficient and accurate as-built data collection and 3D illustrations of the works progress during an infrastructure construction project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
?Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, andmore » builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.« less
Design and Build Approaches for Green Streets
This page serves to discuss the concept behind G3's innovative design build strategy. Design build offers a more comprehensive and streamlined approach to project construction and management compared to my traditional methods and is highly encouraged
Insurance of risks as the instrument of protection of investments into high-rise construction
NASA Astrophysics Data System (ADS)
Vasilyeva, Elena; Okrepilov, Vladimir
2018-03-01
Insurance now is one of the important sectors for both world, and national financial systems. The mechanism of insurance of risks plays an essential role in the process of construction of high-rise buildings and as well as other unique objects. The author argues that insurance is categorically necessary because of the following reasons: huge scale and complexity of high-rise projects and great expenses, the use of unsafe sites for construction, great possible losses in case of the project, important role for the city infrastructure, numerous organizations, involved into the process of construction and maintenance, multypurpose use of the building. The features of insurance in the field of high-rise construction is also considered in the article. The prerequisites, confirming the loss occurrence are named.
ERIC Educational Resources Information Center
Pennsylvania State Univ., University Park. Div. of Occupational and Vocational Studies.
Designed for use by area vocational-technical schools and other vocational programs, this project developed courses of study in eight occupational areas: commercial art, appliance repair, automotive mechanics, graphic arts, building trades maintenance, building construction trades, diesel mechanics, and welding. Course-of-study development…
40 CFR 35.2300 - Grant payments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE Grants for Construction of Treatment Works § 35.2300 Grant payments. Except as provided in § 35... States, its officers, agents, and employees from all liabilities, obligations, and claims arising out of... State shall provide a copy of the agreement to EPA. (f) Design/build projects. For design/build projects...
40 CFR 35.2300 - Grant payments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Grants for Construction of Treatment Works § 35.2300 Grant payments. Except as provided in § 35... States, its officers, agents, and employees from all liabilities, obligations, and claims arising out of... State shall provide a copy of the agreement to EPA. (f) Design/build projects. For design/build projects...
40 CFR 35.2300 - Grant payments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASSISTANCE Grants for Construction of Treatment Works § 35.2300 Grant payments. Except as provided in § 35... States, its officers, agents, and employees from all liabilities, obligations, and claims arising out of... State shall provide a copy of the agreement to EPA. (f) Design/build projects. For design/build projects...
40 CFR 35.2300 - Grant payments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Grants for Construction of Treatment Works § 35.2300 Grant payments. Except as provided in § 35... States, its officers, agents, and employees from all liabilities, obligations, and claims arising out of... State shall provide a copy of the agreement to EPA. (f) Design/build projects. For design/build projects...
40 CFR 35.2300 - Grant payments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE Grants for Construction of Treatment Works § 35.2300 Grant payments. Except as provided in § 35... States, its officers, agents, and employees from all liabilities, obligations, and claims arising out of... State shall provide a copy of the agreement to EPA. (f) Design/build projects. For design/build projects...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...) project grant provided that: (1) The proposed treatment works has an estimated total cost of $8 million or less; (2) The proposed treatment works is an aerated lagoon, trickling filter, waste stabilization pond...
Deployable bamboo structure project: A building life-cycle report
NASA Astrophysics Data System (ADS)
Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.
2017-11-01
Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.
78 FR 46546 - Design-Build Contracting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
...-0043] RIN 2125-AF58 Design-Build Contracting AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... alternative technical concepts (ATC) in design-build project delivery of highway construction. The revisions... design-build proposers to submit ATCs in their technical and price proposals. The FHWA seeks comments on...
Reducing construction waste: A study of urban infrastructure projects.
de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu
2017-09-01
The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Another phase of construction is shown on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.
8. Photographic copy of construction drawing 1976 (original drawing located ...
8. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor plan of entire building. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE
Boat Building Design and Construction Techniques in the Architectural Design Studio.
ERIC Educational Resources Information Center
Smith, Richard A.
1982-01-01
Describes a model boat building project for architectural design studios. Working from traditional sailboat designs, students study the "lines" drawings of boats, make full-size drawings from scale drawings, and then construct model wooden boats. Available from Carfax Publishing Company, P.O. Box 25, Abindgon, Oxfordshire OX14 1RW…
The Hispanic Project for Architecture and Building Construction
ERIC Educational Resources Information Center
Dail, Edward; Mora, Jorge
2006-01-01
John Tyler Community College in Chester, Virginia, began a program in architecture and building construction in fall 2003 to meet the needs of the Hispanic community--a much neglected but rapidly growing segment of the regional population. After first hiring a Hispanic director (Mr. Jorge Mora), a program was developed that heavily involved the…
Deep influence of passive low energy consumption multi-storey residential building in cold region
NASA Astrophysics Data System (ADS)
Shuai, Zhang; Lihua, Zhao; Rong, Jin; Dong, Junyan
2018-02-01
The example of passive architecture demonstration building in Jilin Province, China, based on the practical experience of this project, the control index of passive and low energy consumption residential buildings in cold and passive buildings is referenced by reference to the German construction standard and the Chinese residence construction document, “passive ultra-low energy consumption green Building Technology Guide (Trial)”. The requirement of passive low energy residential buildings on the ground heat transfer coefficient limits is determined, and the performance requirements of passive residential buildings are discussed. This paper analyzes the requirement of the passive low energy residential building on the ground heat transfer coefficient limit, and probes into the influence factors of the ground thermal insulation of the passive low energy consumption residential building. The construction method of passive low energy consumption residential building is proposed.
1961-1968 New Construction Report.
ERIC Educational Resources Information Center
National Association of Physical Plant Administrators of Universities and Colleges, Richmond, IN.
137 NAPPA colleges and universities provided data for this summary. Projects are summarized by thirteen building classifications. Under each classification the following information headings are used--(1) name of institution, (2) project completion date, (3) gross square feet, (4) net assignable area, (5) construction costs, (6) number of stories,…
DOT National Transportation Integrated Search
2000-03-01
Many ITS projects are stand-alone in nature, and do not have to be procured under rules for construction. The installation of field devices and communications infrastructure often meets the definition of construction. However, if a project involves t...
DOT National Transportation Integrated Search
2013-11-05
Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...
ERIC Educational Resources Information Center
Educational Facilities Labs., Inc., New York, NY.
Following a brief history and explication of the School Construction System Development Project, descriptions of a group of standard building components developed to satisfy three objective are presented--(1) to build better schools, (2) to build them more economically, and (3) to build them more rapidly. Detailed structural and performance…
Teaching Sustainable Design Using BIM and Project-Based Energy Simulations
ERIC Educational Resources Information Center
Shen, Zhigang; Jensen, Wayne; Wentz, Timothy; Fischer, Bruce
2012-01-01
The cross-disciplinary nature of energy-efficient building design has created many challenges for architecture, engineering and construction instructors. One of the technical challenges in teaching sustainable building design is enabling students to quantitatively understand how different building designs affect a building's energy performance.…
NASA Technical Reports Server (NTRS)
Bush, Harold
1991-01-01
Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.
NASA Astrophysics Data System (ADS)
Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.
2018-05-01
Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2013 CFR
2013-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2014 CFR
2014-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2011 CFR
2011-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2012 CFR
2012-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
Pitfalls Lurk for School-Project Chiefs
ERIC Educational Resources Information Center
Sack, Joetta L.
2004-01-01
This paper, Part 3 of a three-part series examining the boom in the construction and renovation of K-12 schools and the continuing challenges that communities face in getting the facilities their students and educators need, describes the demanding career aspects of school administrators who oversee construction projects. Building schools requires…
Business Management in Sustainable Buildings: Ankara-Turkey Case
NASA Astrophysics Data System (ADS)
Kutay Karaca, Neşet; Burcu Gültekin, Arzuhan
2017-10-01
The concept of the sustainability is described as efficiently and effectively consuming of exhaustible and recyclable sources of the world. A sustainable building implements sustainability criteria in its life cycle, and business management is the process by which an organization uses its resources in the most efficient way to reach its goal. From the beginning, sustainable building proves their differences from the conventional buildings. Sustainable buildings are resource-efficient and environmentally responsible structures in terms of energy consumption, construction principles, siting, renovation and maintenance throughout its life cycle while conventional buildings are more traditional in these matters. The differences are observable especially in costs and expenditures. It is possible and feasible to compare and contrast the design, construction and management costs of both types of structures. Thence, contributions of sustainable buildings are priced favourably in terms of ecological and sociological aspects. In this context, a prospective projection can be made considering the extra costs of sustainable structures, as well as the consumption profits due to the use of less energy than conventional construction. Considering this, it is possible to project consumption savings in long term. By calculating a forward-looking net cash flow projection, it can be forecasted how much time it will take to cover the extra cost. When making decisions, investors always contemplate maximum profitability. Within the scope of this study, costs of sustainable and conventional buildings will be compared and contrasted through precedence of a sustainable building certificated and non-certificated building. It will be analysed in which time period the initial cost difference between them will be compensated totally and partially. Furthermore, an efficiency analyses will be done in the scope of the necessities and expenses of these businesses.
ERIC Educational Resources Information Center
Agron, Joe
2001-01-01
Presents construction comparative data from the 27th Annual Official Education Construction Report on education construction spending for 2000. Data tables show where the construction is happening by region, projected spending areas through 2003, new school and retrofitting costs, and the types of retrofits being performed. (GR)
Recent health sciences library building projects.
Ludwig, L
1993-01-01
The Medical Library Association's third annual survey of recent health sciences library building projects identified fourteen libraries planning, expanding, or constructing new library facilities. Three of five new library buildings are freestanding structures where the library occupies all or a major portion of the space. The two other new facilities are for separately administered units where the library is a major tenant. Nine projects involve additions to or renovations of existing space. Six projects are in projected, predesign, or design stages or are awaiting funding approval. This paper describes four projects that illustrate technology's growing effect on librarians and libraries. They are designed to accommodate change, a plethora of electronic gear, and easy use of technology. Outwardly, they do not look much different than many other modern buildings. But, inside, the changes have been dramatic although they have evolved slowly as the building structure has been adapted to new conditions. Images PMID:8251970
The Guardian. Volume 13, Issue 1, Spring 2011
2011-01-01
PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...Furthermore, there were no AT standards pertaining to design, material, or construction of new and existing buildings ; building standoff requirements; or...installations or forward-deployed areas; DOD-wide anti¬terrorism building standards for construction , standoff, and so forth; and regular FP exercises held at
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Recycled industrial and construction waste for mutual beneficial use.
DOT National Transportation Integrated Search
2016-08-01
Instead of going to landfills, certain waste materials from industry and building construction can be recycled in transportation infrastructure projects, such as roadway paving. The beneficial use of waste materials in the construction of transportat...
National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W J; Moses, E; Warner, B
2000-12-07
The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
The National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W.J.; Moses, E.; Warner, B.
2000-12-07
The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
IET. Aerial view of project, 95 percent complete. Camera facing ...
IET. Aerial view of project, 95 percent complete. Camera facing east. Left to right: stack, duct, mobile test cell building (TAN-624), four-rail track, dolly. Retaining wall between mobile test building and shielded control building (TAN-620) just beyond. North of control building are tank building (TAN-627) and fuel-transfer pump building (TAN-625). Guard house at upper right along exclusion fence. Construction vehicles and temporary warehouse in view near guard house. Date: June 6, 1955. INEEL negative no. 55-1462 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Teaching Science, 2015
2015-01-01
This project is for a team of students (groups of two or three are ideal) to design and construct a model of a single-span bridge, using plastic drinking straws as the building material. All steps of the design, construction, testing and critiquing stages should be recorded by students in a journal. Students may like to include labelled diagrams,…
Using Project Management Systems at the Construction Field Office
1989-03-01
instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which
23 CFR 635.104 - Method of construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... effectiveness is necessary in selecting projects for the design-build delivery method. [56 FR 37004, Aug. 2... 23 Highways 1 2010-04-01 2010-04-01 false Method of construction. 635.104 Section 635.104 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.104 Method of construction. (a) Actual construction work...
49 CFR 41.119 - DOT regulated buildings.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Each DOT Operating Administration with responsibility for regulating the structural safety of buildings... section pertains to all new building projects for which development of detailed plans and specifications... regulating the structural safety must comply with the seismic design and construction standards in this part...
Research on BIM-based building information value chain reengineering
NASA Astrophysics Data System (ADS)
Hui, Zhao; Weishuang, Xie
2017-04-01
The achievement of value and value-added factor to the building engineering information is accomplished through a chain-flow, that is, building the information value chain. Based on the deconstruction of the information chain on the construction information in the traditional information mode, this paper clarifies the value characteristics and requirements of each stage of the construction project. In order to achieve building information value-added, the paper deconstructs the traditional building information value chain, reengineer the information value chain model on the basis of the theory and techniques of BIM, to build value-added management model and analyse the value of the model.
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. Springer and A. German
2015-09-01
Building cost effective, high performance homes that provide superior comfort, health, and durability is the goal of the Department of Energy's (DOE's) Zero Energy Ready Homes (ZERH) program. This case study describes the development of a 62-unit multifamily community constructed by nonprofit developer Mutual Housing at the Spring Lake subdivision in Woodland, California. The Spring Lake project is expected to be the first ZERH-certified multifamily project nationwide. Building America team Alliance for Residential Building Innovation worked with Mutual Housing throughout the project. An objective of this project was to gain a highly visible foothold for residential buildings built to themore » DOE ZERH specification that can be used to encourage participation by other California builders.« less
A review of BIM (Building Information Modeling) implementation in Indonesia construction industry
NASA Astrophysics Data System (ADS)
Suryadinata Telaga, Abdi
2018-05-01
Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.
School Building Construction Through Private Funds in a Small School District.
ERIC Educational Resources Information Center
Brames, Fred
The private corporation leasing arrangement, as a source of school construction funds, is increasingly being used in Indiana; however, the principles are applicable in any state. The private corporation charges a project fee, which represents its maximum anticipated profit. The private corporation obtains the funds for the project; makes the…
Renovating and Reconstructing in Phases--Specifying Phased Construction.
ERIC Educational Resources Information Center
Bunzick, John
2002-01-01
Discusses planning for phased school construction projects, including effects on occupancy (for example, construction adjacent to occupied space, construction procedure safety zones near occupied areas, and code-complying means of egress), effects on building systems (such as heating and cooling equipment and power distribution), and contract…
RANT Building Upgrade Pre-Proposal Meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, Melinda Ann; Meadows, Darren W.; Rodriguez, Roger R.
This presentation is designed to provide an overview of the project scope and RFP; discuss interfaces for the construction project; highlight key expectations and deliverables from the subcontractor; and address questions and provide clarification of the project scope.
FOSTERING SUSTAINABILITY: DESIGNING A GREEN SCIENCE BUILDING AT A SMALL MAINE COLLEGE
The overarching goal of the project ‘as to develop a feasibility study of building design and construction that takes into account the various local conditions, optimizes energy savings. use of building materials, and long term sustainability of the structur...
2 CFR 215.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-01-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... the acquisition of equipment, buildings or land, the total value of the donated property may be...
43 CFR 12.923 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
43 CFR 12.923 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
43 CFR 12.923 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
43 CFR 12.923 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
43 CFR 12.923 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
A financing model to solve financial barriers for implementing green building projects.
Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.
A Financing Model to Solve Financial Barriers for Implementing Green Building Projects
Lee, Baekrae; Kim, Juhyung; Kim, Jaejun
2013-01-01
Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379
Technology Solutions Case Study: High-Performance Ducts in Hot-Dry Climates
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. Hoeschele, A. German, E. Weitzel, R. Chitwood
2015-08-01
Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, andmore » builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.« less
Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up
NASA Technical Reports Server (NTRS)
Khoshnevis, B.; Carlson, A.; Leach N.; Thangavelu, M.
2016-01-01
Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project focused on a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project aimed to study new methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars.
7. Photographic copy of construction drawing 1976 (original drawing located ...
7. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations of entire building exterior. Includes elevation, plan and details of the addition's interior stairs. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Building cost effective, high performance homes that provide superior comfort, health, and durability is the goal of the Department of Energy's (DOE's) Zero Energy Ready Homes (ZERH) program. Through Building America research and other innovative programs throughout the country, many of the technical challenges to building to the ZERH standard have been addressed. This case study describes the development of a 62-unit multifamily community constructed by nonprofit developer Mutual Housing at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH-certified multifamily project nationwide. Building America team Alliance for Residential Building Innovationmore » worked with Mutual Housing throughout the project. The case study discusses challenges encountered, lessons learned, and how obstacles were overcome. An objective of this project was to gain a highly visible foothold for residential buildings built to the DOE ZERH specification that can be used to encourage participation by other California builders.« less
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
Additive Construction with Mobile Emplacement (ACME)
NASA Technical Reports Server (NTRS)
Vickers, John
2015-01-01
The Additive Construction with Mobile Emplacement (ACME) project is developing technology to build structures on planetary surfaces using in-situ resources. The project focuses on the construction of both 2D (landing pads, roads, and structure foundations) and 3D (habitats, garages, radiation shelters, and other structures) infrastructure needs for planetary surface missions. The ACME project seeks to raise the Technology Readiness Level (TRL) of two components needed for planetary surface habitation and exploration: 3D additive construction (e.g., contour crafting), and excavation and handling technologies (to effectively and continuously produce in-situ feedstock). Additionally, the ACME project supports the research and development of new materials for planetary surface construction, with the goal of reducing the amount of material to be launched from Earth.
Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, Philip
2012-09-01
Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
Health sciences library building projects: 1995 survey.
Ludwig, L
1996-01-01
The Medical Library Association's fifth annual survey of recent health sciences library building projects identified twenty-five libraries planning, expanding, or constructing new library facilities. None of the fifteen new library projects are free standing structures; however, several occupy a major portion of the project space. Ten projects involve renovation of or addition to existing space. Information regarding size, cost of project, type of construction, completion date, and other factual data was provided for twelve projects. The remaining identified projects are in pre-design or early-design stages, or are awaiting funding approval. Library building projects for three hospital libraries, three academic medical libraries, and an association library are described. Each illustrates how considerations of economics and technology are changing the traditional library model from a centrally stored information depository housing a wide range of information under one roof where users come to the information, into an electronic model gradually shifting from investment in the physical presence of resources to investment in creating work space for creditible information specialists who help in-house and distanced users to obtain information electronically from any place and at any time. This new model includes a highly skilled library team to manage, filter, and package the information to users trained by these resident experts. Images PMID:8883981
Health sciences library building projects: 1995 survey.
Ludwig, L
1996-07-01
The Medical Library Association's fifth annual survey of recent health sciences library building projects identified twenty-five libraries planning, expanding, or constructing new library facilities. None of the fifteen new library projects are free standing structures; however, several occupy a major portion of the project space. Ten projects involve renovation of or addition to existing space. Information regarding size, cost of project, type of construction, completion date, and other factual data was provided for twelve projects. The remaining identified projects are in pre-design or early-design stages, or are awaiting funding approval. Library building projects for three hospital libraries, three academic medical libraries, and an association library are described. Each illustrates how considerations of economics and technology are changing the traditional library model from a centrally stored information depository housing a wide range of information under one roof where users come to the information, into an electronic model gradually shifting from investment in the physical presence of resources to investment in creating work space for creditible information specialists who help in-house and distanced users to obtain information electronically from any place and at any time. This new model includes a highly skilled library team to manage, filter, and package the information to users trained by these resident experts.
41 CFR 128-1.8006 - Seismic Safety Program requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... reviewer shall verify that the current level of seismic resistance of the existing building at least equals the seismic resistance level of the building before the addition. (c) The Department Seismic Safety... conduct the reviews required under this section, as appropriate. (a) New building projects. Construction...
20 CFR 435.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-04-01
... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...
20 CFR 435.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-04-01
... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...
20 CFR 435.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-04-01
... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...
20 CFR 435.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...
20 CFR 435.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-04-01
... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Antonopoulos, Chrissi A.; Baechler, Michael C.; Dillon, Heather E.
This study presents findings from questionnaire and interview data investigating replication efforts of Commercial Building Partnership (CBP) partners that worked directly with the Pacific Northwest National Laboratory (PNNL). PNNL partnered with 12 organizations on new and retrofit construction projects as part of the U.S. Department of Energy (DOE) CBP program. PNNL and other national laboratories collaborate with industry leaders that own large portfolios of buildings to develop high performance projects for new construction and renovation. This project accelerates market adoption of commercially available energy saving technologies into the design process for new and upgraded commercial buildings. The labs provide assistancemore » to the partners’ design teams and make a business case for energy investments. From the owner’s perspective, a sound investment results in energy savings based on corporate objectives and design. Through a feedback questionnaire, along with personal interviews, PNNL gathered qualitative and quantitative information relating to replication efforts by each organization. Data through this process were analyzed to provide insight into two primary research areas: 1) CBP partners’ replication efforts of technologies and approaches used in the CBP project to the rest of the organization’s building portfolio (including replication verification), and, 2) the market potential for technology diffusion into the total U.S. commercial building stock, as a direct result of the CBP entire program.« less
Effective and efficient implementation of alternative project delivery : research summary.
DOT National Transportation Integrated Search
2017-05-01
Alternative project delivery (APD) methods such as Design Build (DB) and Construction Manager at Risk (CMAR), are used by state departments of transportation to improve the efficiency and effectiveness of project delivery. The Maryland Department of ...
Building the Superconducting Super Collider, 1989-1993: The Problem of Project Management
NASA Astrophysics Data System (ADS)
Riordan, Michael
2011-04-01
In attempting to construct the Superconducting Super Collider, US particle physicists faced a challenge unprecedented in the history of science. The SSC was the biggest and costliest pure scientific project ever, comparable in overall scale to the Manhattan Project or the Panama Canal - an order of magnitude larger than any previous particle accelerator or collider project. Managing such an enormous endeavor involved coordinating conventional-construction, magnet-manufacturing, and detector-building efforts costing over a billion dollars apiece. Because project-management experience at this scale did not exist within the physics community, the Universities Research Association and the US Department of Energy turned to companies and individuals from the military-industrial complex, with mixed results. The absence of a strong, qualified individual to serve as Project Manager throughout the duration of the project was a major problem. I contend that these problems in its project management contributed importantly to the SSC's 1993 demise. Research supported by NSF Award No. 823296.
Jaillon, L; Poon, C S; Chiang, Y H
2009-01-01
As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.
The prediction of engineering cost for green buildings based on information entropy
NASA Astrophysics Data System (ADS)
Liang, Guoqiang; Huang, Jinglian
2018-03-01
Green building is the developing trend in the world building industry. Additionally, construction costs are an essential consideration in building constructions. Therefore, it is necessary to investigate the problems of cost prediction in green building. On the basis of analyzing the cost of green building, this paper proposes the forecasting method of actual cost in green building based on information entropy and provides the forecasting working procedure. Using the probability density obtained from statistical data, such as labor costs, material costs, machinery costs, administration costs, profits, risk costs a unit project quotation and etc., situations can be predicted which lead to cost variations between budgeted cost and actual cost in constructions, through estimating the information entropy of budgeted cost and actual cost. The research results of this article have a practical significance in cost control of green building. Additionally, the method proposed in this article can be generalized and applied to a variety of other aspects in building management.
The environmental impacts of major development projects – office buildings, shopping malls, sports stadiums, college campuses, and the like -- don’t end with construction. From design and construction to operation and maintenance and all the way through t
Mechanisation and automation technologies development in work at construction sites
NASA Astrophysics Data System (ADS)
Sobotka, A.; Pacewicz, K.
2017-10-01
Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.
Block Building for Children: Making Buildings of the World with the Ultimate Construction Toy.
ERIC Educational Resources Information Center
Walker, Lester
This book presents a series of projects for children of all levels of expertise, beginning with abstract patterns, rows, and towers and progressing to step-by-step instructions for 18 projects, including a bridge, boat dock, airport, shopping mall, skyscraper, castle, Greek temple, Toy Store City, City of the Future, and The Emerald City of Oz.…
Complex assessment of urban housing energy sustainability
NASA Astrophysics Data System (ADS)
Popova, Olga; Glebova, Julia; Karakozova, Irina
2018-03-01
The article presents the results of a complex experimental-analytical research of residential development energy parameters - survey of construction sites and determination of calculated energy parameters (resistance to heat transfer) considering their technical condition. The authors suggest a methodology for assessing residential development energy parameters on the basis of construction project's structural analysis with the use of advanced intelligent collection systems, processing (self-organizing maps - SOM) and data visualization (geo-informational systems - GIS). SOM clustering permitted to divide the housing stock (on the example of Arkhangelsk city) into groups with similar technical-operational and energy parameters. It is also possible to measure energy parameters of construction project of each cluster by comparing them with reference (normative) measures and also with each other. The authors propose mechanisms for increasing the area's energy stability level by implementing a set of reproduction activities for residential development of various groups. The analysis showed that modern multilevel and high-rise construction buildings have the least heat losses. At present, however, ow-rise wood buildings is the dominant styles of buildings of Arkhangelsk city. Data visualisation on the created heat map showed that such housing stock covers the largest urban area. The development strategies for depressed areas is in a high-rise building, which show the economic, social and environmental benefits of upward growth of the city. An urban regeneration programme for severely rundown urban housing estates is in a high-rise construction building, which show the economic, social and environmental benefits of upward growth of the city.
29 CFR 95.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-07-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...
22 CFR 145.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-04-01
... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
49 CFR 19.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
49 CFR 19.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
49 CFR 19.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
38 CFR 49.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-07-01
... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...
29 CFR 95.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-07-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...
29 CFR 95.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-07-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...
22 CFR 145.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-04-01
... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
29 CFR 95.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-07-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...
22 CFR 145.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-04-01
... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
49 CFR 19.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
10 CFR 600.123 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...
38 CFR 49.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-07-01
... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...
10 CFR 600.123 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...
10 CFR 600.123 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...
38 CFR 49.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-07-01
... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...
38 CFR 49.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-07-01
... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...
38 CFR 49.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-07-01
... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...
22 CFR 145.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-04-01
... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
10 CFR 600.123 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...
49 CFR 19.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-10-01
... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
10 CFR 600.123 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... equipment, buildings and land for which title passes to the recipient may differ according to the purpose of... to assist the recipient in the acquisition of equipment, buildings or land, the total value of the...
29 CFR 95.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-07-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...
22 CFR 145.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-04-01
... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
14 CFR § 1260.123 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the... matching for donated equipment, buildings and land for which title passes to the recipient may differ.... (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on the various types of construction that may be used, the materials available, and some elementary aspects of the services required…
Academic Library Buildings in 1980.
ERIC Educational Resources Information Center
Livingston, Barbara; And Others
1980-01-01
Reports a trend toward the inclusion of academic libraries in building complexes and shared space. Only a handful of construction and remodeling projects completed in the year ending June 30, 1980, have costs in excess of $1 million. (RAA)
3. Photographic copy of roof truss construction details for Building ...
3. Photographic copy of roof truss construction details for Building 4505, Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Hangar Type P-A, Detail of Trusses T-2, T-3, T-4, T-5 & T6, Sheet No. 9, March 1944. A similar drawing for truss T-l is included in project field notes. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Hangar, End of North Base Road, Boron, Kern County, CA
Project risk management in the construction of high-rise buildings
NASA Astrophysics Data System (ADS)
Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya
2018-03-01
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.
The communication in industrialised building system (IBS) construction project: Virtual environment
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd
2017-10-01
Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.
NASA Astrophysics Data System (ADS)
Fai, S.; Filippi, M.; Paliaga, S.
2013-07-01
Whether a house of worship or a simple farmhouse, the fabrication of a building reveals both the unspoken cultural aspirations of the builder and the inevitable exigencies of the construction process. In other-words, why buildings are made is intimately and inevitably associated with how buildings are made. Nowhere is this more evident than in vernacular architecture. At the Carleton Immersive Media Studio (CIMS) we are concerned that the de-population of Canada's rural areas, paucity of specialized tradespersons, and increasing complexity of building codes threaten the sustainability of this invaluable cultural resource. For current and future generations, the quantitative and qualitative values of traditional methods of construction are essential for an inclusive cultural memory. More practically, and equally pressing, an operational knowledge of these technologies is essential for the conservation of our built heritage. To address these concerns, CIMS has launched a number of research initiatives over the past five years that explore novel protocols for the documentation and dissemination of knowledge related to traditional methods of construction. Our current project, Cultural Diversity and Material Imagination in Canadian Architecture (CDMICA), made possible through funding from Canada's Social Sciences and Humanities Research Council (SSHRC), explores the potential of building information modelling (BIM) within the context of a web-based environment. In this paper, we discuss our work-to-date on the development of a web-based library of BIM details that is referenced to ''typical'' assemblies culled from 19C and early 20C construction manuals. The parametric potential of these ''typical'' details is further refined by evidence from the documentation of ''specific'' details studied during comprehensive surveys of extant heritage buildings. Here, we consider a BIM of the roof truss assembly of one of the oldest buildings in Canada's national capital - the Commissariat Building and current home to the Bytown Museum - as a case study within the CDMICA project.
Mercader-Moyano, Pilar; Ramírez-de-Arellano-Agudo, Antonio
2013-05-01
The unfortunate economic situation involving Spain and the European Union is, among other factors, the result of intensive construction activity over recent years. The excessive consumption of natural resources, together with the impact caused by the uncontrolled dumping of untreated C&D waste in illegal landfills have caused environmental pollution and a deterioration of the landscape. The objective of this research was to generate a selective classification and quantification model of C&D waste based on the material resources consumed in the construction of residential buildings, either new or renovated, namely the Conventional Constructive Model (CCM). A practical example carried out on ten residential buildings in Seville, Spain, enabled the identification and quantification of the C&D waste generated in their construction and the origin of the waste, in terms of the building material from which it originated and its impact for every m(2) constructed. This model enables other researchers to establish comparisons between the various improvements proposed for the minimization of the environmental impact produced by building a CCM, new corrective measures to be proposed in future policies that regulate the production and management of C&D waste generated in construction from the design stage to the completion of the construction process, and the establishment of sustainable management for C&D waste and for the selection of materials for the construction on projected or renovated buildings.
48 CFR 570.105-2 - Two-phase design-build selection procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... lease construction projects with options to purchase the real property leased. Use the procedures in.... (iii) The capability and experience of potential contractors. (iv) The suitability of the project for...
NASA Astrophysics Data System (ADS)
Del Giudice, M.; Osello, A.
2013-07-01
When you think about the Architecture, Engineering and Construction (AEC) Industry people tend to refers to new buildings, but nowadays the recovery of existing ones is increasingly the subject of the research. The current historical context raises this issue at the center of numerous thought due both to economic and environmental conditions. So, the need to refurbish the cultural heritage is becoming more important than the construction of new buildings. Modern technologies allow professionals to do this to turn the buildings into structures capable to meet the users' confort with a considerable energy saving. Italy is trying to make a change to the construction industry through the national InnovANCE project, which aims to develop the first national database able to share information among professionals through the help of Building Information Modeling (BIM). In this way the subject involved in a construction process can update their way of working, with a consequent time and cost saving. This paper aims to present the way in which the InnovANCE project can be considered as the key for Italy to change the way to conceive the building industry, using a case study such as the old thermal power of Politecnico di Torino, starting from the survey step. The methodology followed to obtain the 3D model will be described, starting from the data of a topographic and a laser scanner survey and from an archival documents research.
NASA Astrophysics Data System (ADS)
Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay
2018-03-01
The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
2 CFR 215.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
45 CFR 2543.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
2 CFR 215.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
45 CFR 2543.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
45 CFR 2543.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
45 CFR 2543.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-10-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
45 CFR 2543.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings and land for which title passes to the recipient may differ according to the purpose of the award: (1) If the purpose of the award is to assist the recipient in the acquisition of equipment, buildings...
2 CFR 215.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-01-01
... buildings or land for construction/facilities acquisition projects or long-term use, the value of the..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...
Planning Educational Facilities for the Next Century.
ERIC Educational Resources Information Center
Earthman, Glen I.
A school building constructed 10 years ago may not be relevant to what is needed in a new building today. Methodology and curriculum change rapidly, and, as a result, buildings change as do the students attending schools today. The administrators in the school system are responsible for adequately planning a new capital-improvement project and…
Construction. A Report on the Industry
2004-06-01
Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The
ERIC Educational Resources Information Center
Ghebtsawi, Tesheme
This report illustrates the method, called the "SfB System," recommended in an earlier publication by this organization, for systematization of building projects. The aim of the report is to show how to arrange information on building elements and building construction for clear definition of the parts to be built and for easy…
24 CFR 241.645 - Labor standards and prevailing wage requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AUTHORITIES SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Eligibility Requirements-Supplemental Loans... Individual Utility Meters in Multifamily Projects Without a HUD-Insured or HUD-Held Mortgage Special... building loan agreement executed for the performance of construction of the project shall comply with all...
DOT National Transportation Integrated Search
2001-10-01
Public agencies across the country are pursuing innovative project delivery methods such as design-build (D-B) and construction manager-at-risk (CM-at-risk) to improve cycle-time performance on projects, and numerous transportation departments are cu...
IT Requirements Integration in High-Rise Construction Design Projects
NASA Astrophysics Data System (ADS)
Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam
2018-03-01
The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may... design/build, construction management at risk and force account. If an alternate method is used, the... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Allowable methods of procurement...
THE CRITICAL-PATH METHOD OF CONSTRUCTION CONTROL.
ERIC Educational Resources Information Center
DOMBROW, RODGER T.; MAUCHLY, JOHN
THIS DISCUSSION PRESENTS A DEFINITION AND BRIEF DESCRIPTION OF THE CRITICAL-PATH METHOD AS APPLIED TO BUILDING CONSTRUCTION. INTRODUCING REMARKS CONSIDER THE MOST PERTINENT QUESTIONS PERTAINING TO CPM AND THE NEEDS ASSOCIATED WITH MINIMIZING TIME AND COST ON CONSTRUCTION PROJECTS. SPECIFIC DISCUSSION INCLUDES--(1) ADVANTAGES OF NETWORK TECHNIQUES,…
Design and Construction Documents Associated with N232, Sustainability Base
NASA Technical Reports Server (NTRS)
Zornetzer, Steven F.; Schuler, Raymond F.; Grymes, Rosalind A.
2014-01-01
This request comprehensively covers documents associated with the design and construction of Sustainability Base, N232. The intent of this project specifically envisioned broad dissemination of these materials to others undertaking the design and construction of high-performing energy- and resource-efficient buildings in comparable climate zones.
Using Construction Management for Public and Institutional Facilities.
ERIC Educational Resources Information Center
Public Technology, Inc., Washington, DC.
Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…
ERIC Educational Resources Information Center
Chen, Pearl; McGrath, Diane
2003-01-01
This study documented the processes of knowledge construction and knowledge representation in high school students' hypermedia design projects. Analysis of knowledge construction in linking and structural building yielded distinct types and subtypes of hypermedia documents, which were characterized by four features of knowledge representation: (a)…
Code of Federal Regulations, 2013 CFR
2013-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
A Principal's Guide to On-Site School Construction
ERIC Educational Resources Information Center
Brenner, William A.
2009-01-01
This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, H.J.
1978-01-01
This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less
Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, Evan
2009-07-16
The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratorymore » has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.« less
Unbonded prestressing tendons and their role in the construction of slender elements of buildings
NASA Astrophysics Data System (ADS)
Mieszczak, M.
2018-03-01
Steel unbonded tendons have been introduced in Europe for construction prestressing many years later than in the USA, Honkong, Singapore or Australia. In Poland, they appeared in the early 1990s. Despite their short application, in the last decade, the Institute of Materials and Building Constructions of the Cracow University of Technology in cooperation with the TCE Structural Design & Consulting company has developed and implemented several interesting and unique designs of building components, using the advantages of this type of prestressing. In the author’s work, apart from the short description of these tendons, several selected (own and foreign) projects of unique character have been presented.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Construction § 1000.243 What special provisions... building codes and applicable engineering standards, appropriate for the particular project; and (3...
The TRAINS project: A case study in building a conversational planning agent
NASA Astrophysics Data System (ADS)
Allen, James F.; Schubert, Lenhart K.; Ferguson, George; Heeman, Peter; Hwang, Chung Hee; Kato, Tsuneaki; Light, Marc; Martin, Nathaniel G.; Miller, Bradford W.; Poesio, Massimo
1994-09-01
The TRAINS project is an effort to build a conversationally proficient planning assistant. A key part of the project is the construction of the TRAINS system, which provides the research platform for a wide range of issues in natural language understanding, mixed-initiative planning systems, and representing and reasoning about time, actions and events. Four years have not passed since the beginning of the project. Each year, we produced a demonstration system that focused on a dialog that illustrated particular aspects of our research. The commitment to building complete integrated systems is a significant overhead on the research, but we feel it is essential to guarantee that the results constitute real progress in the field. This paper describes the goals of the project, and our experience with the effort so far.
Architectural design of the science complex at Elizabeth City State University
NASA Technical Reports Server (NTRS)
Jahromi, Soheila
1993-01-01
This paper gives an overall view of the architectural design process and elements in taking an idea from conception to execution. The project presented is an example for this process. Once the need for a new structure is established, an architect studies the requirements, opinions and limits in creating a structure that people will exist in, move through, and use. Elements in designing a building include factors such as volume and surface, light and form changes of scale and view, movement and stasis. Some of the other factors are functions and physical conditions of construction. Based on experience, intuition, and boundaries, an architect will utilize all elements in creating a new building. In general, the design process begins with studying the spatial needs which develop into an architectural program. A comprehensive and accurate architectural program is essential for having a successful building. The most attractive building which does not meet the functional needs of its users has failed at the primary reason for its existence. To have a good program an architect must have a full understanding of the daily functions that will take place in the building. The architectural program along with site characteristics are among a few of the important guidelines in studying the form, adjacencies, and circulation for the structure itself and also in relation to the adjacent structures. Conceptual studies are part of the schematic design, which is the first milestone in the design process. The other reference points are design development and construction documents. At each milestone, review and coordination with all the consultants is established, and the user is essential in refining the project. In design development phase, conceptual diagrams take shape, and architectural, structural, mechanical, and electrical systems are developed. The final phase construction documents convey all the information required to construct the building. The design process and elements described were applied in the following project.
ERIC Educational Resources Information Center
Haigh, Sarah; Bell, Christopher; Ruta, Chris
2017-01-01
This article provides details of a successful educational engineering project run in partnership between a group of ten schools and an international engineering, construction and technical services company. It covers the history and evolution of the project and highlights how the project has significant impact not only on the students involved but…
Cancer Research Center Indiana University School of Medicine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-08-01
The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less
2012-08-01
Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a
A Maritime Phase Zero Force for the Year 2020
2009-06-01
mind, the team constructed maritime forces and then evaluated them against the same scenarios to determine which ones performed better. The...120 1. Project Methodology and Choice of Missions ...............................120 2. Missions and Scenarios construction methodology... projects are designed to build tools that students in the Systems Engineering Analysis curriculum have learned over the 18 month enrollment in the program
Civilian Surge. Key to Complex Operations
2009-01-01
being settled, the U.S. Army contributed to building bridges and roads and other construction projects . After World War II, the military focused...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ...of civilians needed to perform such duties as building governments, repairing infrastructure, and opening schools. In both countries, PRTs rely
BLDG. 16 - PROGRESS PHOTO (CLEAR LAKE)
1963-09-25
S63-17423 (25 Sept. 1963) --- This easterly view documents early construction of the Manned Spacecraft Center in September of 1963. The Avionics Systems Laboratory (Building 16) is in the foreground and the Project Management Building is see in the right background. Photo credit: NASA
340 Facility secondary containment and leak detection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bendixsen, R.B.
1995-01-31
This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.
ERIC Educational Resources Information Center
LIEBESKIND, MORRIS
PROBLEMS IN THE SCHEDULING AND COMPLETION OF SCHOOL BUILDING DESIGN AND CONSTRUCTION PROJECTS ARE DISCUSSED WITH REFERENCE TO THE CRITICAL PATH METHOD OF PROGRAMING. THE DISCUSSION GIVES A BROAD OVERVIEW OF THE METHOD WITH DETAILED SUGGESTIONS FOR SCHOOL ADMINISTRATORS. SPECIFIC SUBJECT AREAS INCLUDE--(1) CPM, A NEW MANAGEMENT TOOL, (2) CPM…
ERIC Educational Resources Information Center
Wilson, Alex
2008-01-01
To those entrenched in the green building world, the benefits seem obvious. Why would anyone choose to build in a way that isn't comfortable, healthy, energy efficient, and environmentally responsible? Even within a single college or university project, different team members often have different reasons for promoting a green agenda. Architects…
This document provides background information on how the sustainable reuse of brownfield properties includes efforts to reduce the environmental impact by reusing and recycling materials generated during building construction, demolition, or renovation.
Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lnu, Indumathi
University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than themore » other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.« less
7 CFR 3565.205 - Eligible uses of loan proceeds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... fees for projects proposed for a guaranteed loan provided the costs and features are reasonable and... loan may be used for the following purposes relating to the project. (1) New construction costs of the project; (2) Moderate or substantial rehabilitation of buildings and acquisition costs when related to the...
Gimme Shelter!: Doghouse Project Hones Construction Skills
ERIC Educational Resources Information Center
Shackelford, Ray; Griffis, Kurt
2007-01-01
In Rover's House project, students practice planning, measurement, layout, and processing skills in building a doghouse. The project is more than a doghouse--it is a learning activity that helps students develop and enhance their ability to work with reinforced concrete, steel and wood studs, trusses, roofing materials and a variety of…
Parametric Workflow (BIM) for the Repair Construction of Traditional Historic Architecture in Taiwan
NASA Astrophysics Data System (ADS)
Ma, Y.-P.; Hsu, C. C.; Lin, M.-C.; Tsai, Z.-W.; Chen, J.-Y.
2015-08-01
In Taiwan, numerous existing traditional buildings are constructed with wooden structures, brick structures, and stone structures. This paper will focus on the Taiwan traditional historic architecture and target the traditional wooden structure buildings as the design proposition and process the BIM workflow for modeling complex wooden combination geometry, integrating with more traditional 2D documents and for visualizing repair construction assumptions within the 3D model representation. The goal of this article is to explore the current problems to overcome in wooden historic building conservation, and introduce the BIM technology in the case of conserving, documenting, managing, and creating full engineering drawings and information for effectively support historic conservation. Although BIM is mostly oriented to current construction praxis, there have been some attempts to investigate its applicability in historic conservation projects. This article also illustrates the importance and advantages of using BIM workflow in repair construction process, when comparing with generic workflow.
Villoria Sáez, Paola; del Río Merino, Mercedes; Porras-Amores, César
2012-02-01
The management planning of construction and demolition (C&D) waste uses a single indicator which does not provide enough detailed information. Therefore the determination and implementation of other innovative and precise indicators should be determined. The aim of this research work is to improve existing C&D waste quantification tools in the construction of new residential buildings in Spain. For this purpose, several housing projects were studied to determine an estimation of C&D waste generated during their construction process. This paper determines the values of three indicators to estimate the generation of C&D waste in new residential buildings in Spain, itemizing types of waste and construction stages. The inclusion of two more accurate indicators, in addition to the global one commonly in use, provides a significant improvement in C&D waste quantification tools and management planning.
Identification of critical factors affecting flexibility in hospital construction projects.
Olsson, Nils E O; Hansen, Geir K
2010-01-01
This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building? Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated. The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent different aspects of flexibility. One of the cases illustrates how late changes can have a significant negative impact on the project itself, contributing to delays and cost overruns. Another case illustrates that late scope lock-in on a limited part of the project, in this case related to medical equipment, can be done in a controlled manner. Project owners and users appear to have given flexibility high priority. Project management teams are less likely to embrace changes and late scope lock-in. Architects and consultants are important for translating program requirements into physical design. A highly flexible building did not stop some stakeholders from pushing for significant changes and extensions during construction.
34 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-07-01
... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...
34 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-07-01
... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...
34 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-07-01
... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...
22 CFR 226.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-04-01
... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
22 CFR 226.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-04-01
... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
34 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-07-01
... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...
22 CFR 226.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-04-01
... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
34 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-07-01
... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...
22 CFR 226.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-04-01
... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
Early stage design decisions: the way to achieve sustainable buildings at lower costs.
Bragança, Luís; Vieira, Susana M; Andrade, Joana B
2014-01-01
The construction industry attempts to produce buildings with as lower environmental impact as possible. However, construction activities still greatly affect environment; therefore, it is necessary to consider a sustainable project approach based on its performance. Sustainability is an important issue to consider in design, not only due to environmental concerns but also due to economic and social matters, promoting architectural quality and economic advantages. This paper aims to identify the phases through which a design project should be developed, emphasising the importance and ability of earlier stages to influence sustainability, performance, and life cycle cost. Then, a selection of sustainability key indicators, able to be used at the design conceptual phase and able to start predicting environmental sustainability performance of buildings is presented. The output of this paper aimed to enable designers to compare and evaluate the consequences of different design solutions, based on preliminary data, and facilitate the collaboration between stakeholders and clients and eventually yield a sustainable and high performance building throughout its life cycle.
Early Stage Design Decisions: The Way to Achieve Sustainable Buildings at Lower Costs
Bragança, Luís; Vieira, Susana M.; Andrade, Joana B.
2014-01-01
The construction industry attempts to produce buildings with as lower environmental impact as possible. However, construction activities still greatly affect environment; therefore, it is necessary to consider a sustainable project approach based on its performance. Sustainability is an important issue to consider in design, not only due to environmental concerns but also due to economic and social matters, promoting architectural quality and economic advantages. This paper aims to identify the phases through which a design project should be developed, emphasising the importance and ability of earlier stages to influence sustainability, performance, and life cycle cost. Then, a selection of sustainability key indicators, able to be used at the design conceptual phase and able to start predicting environmental sustainability performance of buildings is presented. The output of this paper aimed to enable designers to compare and evaluate the consequences of different design solutions, based on preliminary data, and facilitate the collaboration between stakeholders and clients and eventually yield a sustainable and high performance building throughout its life cycle. PMID:24578630
Engineering monitoring expert system's developer
NASA Technical Reports Server (NTRS)
Lo, Ching F.
1991-01-01
This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.
NASA Astrophysics Data System (ADS)
Dalibi, S. G.; Feng, J. C.; Shuangqin, Liu; Sadiq, Abubakar; Bello, B. S.; Danja, I. I.
2017-05-01
Developing countries like Nigeria are faced with the growth of residential housing sector accompanied by huge power, water, and material consumptions etc., which were due to the population growth, increased households and the increased urbanization. The construction industry is guilty of many practices because its activities have adversely affected the environment negatively. It responded with new initiative called Eco / green / sustainable buildings to ensure environmental sustainability. Despite all these glaring challenges green building developments and sustainable practices are embraced very slowly and practiced at slow pace in the Nigeria’s construction industry. This is worrisome and is due to some factors hindering such pace. The aim of this paper is to identify, examine and assess the factors that are hindering green building developments based on the project professionals’ perceptions. Reviewed literatures were used to identify the various factors that hindered the adoption of green measures and practices within the Nigeria’s built environment. A questionnaire survey was conducted within the industry. The results showed the major factors hindering green building developments and practices in the Nigeria’s built environment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-06-01
This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less
The Bibliotherapy Education Project: Alive and Well--and Perpetually "Under Construction"
ERIC Educational Resources Information Center
McMillen, Paula S.
2008-01-01
The Bibliotherapy Education Project began as a teaching collaboration between faculty at Oregon State University's Libraries and School of Education. The project's evolution from 1999 to 2004 was previously described in this journal (McMillen 2005). The core of the project is a book evaluation tool, which builds counselor skill and knowledge in…
How to Select a Project Delivery Method for School Facilities
ERIC Educational Resources Information Center
Kalina, David
2007-01-01
In this article, the author discusses and explains three project delivery methods that are commonly used today in the United States. The first project delivery method mentioned is the design-bid-build, which is still the predominant method of project delivery for public works and school construction in the United States. The second is the…
2012-11-01
Building Information Modeling ( BIM ...12-2, Supplement 2 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 2 – BIM ...39180 ERDC SR-12-2, Supplement 2 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac-
2012-11-01
Building Information Modeling ( BIM ...12-2, Supplement 1 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 1 – BIM ...ERDC SR-12-2, Supplement 1 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac- ceptance throughout
M. Omar Amini; John W. van de Lindt; Shiling Pei; Douglas Rammer; Phil Line; Marjan Popovski
2014-01-01
Cross-laminated Timber (CLT) has been extensively used in Europe and is now gaining momentum in North America; both Canada and more recently the U.S. Construction projects have shown that CLT can effectively be used as an alternative construction material in mid-rise structures and has significant potential in commercial and industrial buildings. In the United States,...
2011-09-30
the project was for “routine maintenance and repair and improvements to non-historic buildings and structures in the Camp Lejeune Complex...and cost overruns; and (5) program goals are achieved, including specific program outcomes and improved results on broader economic indicators. 1...Department of the Navy received approximately $1.2 billion in Recovery Act funds for Operations and Maintenance ; Military Construction; and Research
NASA Astrophysics Data System (ADS)
Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.
2017-08-01
In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.
TA-03-0035 Press Building – D&D
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasenack, Marvin Leroy
The Press Building was constructed in 1954 with 15,073 ft 2 of floor space. It was built to house a 5000 ton double action Lake Erie hydraulic press and a uranium casting area. Missions included uranium activities associated with the Nuclear Weapons and Rover Rocket programs. At the end of the Rover program, the building continued to support various uranium materials science projects until the building was placed into a cold and dark status in 2013 and then was demolished in 2017. The building interior, the press, and associated systems were radiological contaminated and disposed of as low level waste.more » The demolition of this building opened up valuable real estate in the TA-3 area for the future construction of an ~11,000 Sq. Ft. Biosafety Level 2 laboratory and office building. This building will support the ongoing Bioscience Division mission at the laboratory.« less
Application of BIM technology in green scientific research office building
NASA Astrophysics Data System (ADS)
Ni, Xin; Sun, Jianhua; Wang, Bo
2017-05-01
BIM technology as a kind of information technology, has been along with the advancement of building industrialization application in domestic building industry gradually. Based on reasonable construction BIM model, using BIM technology platform, through collaborative design tools can effectively improve the design efficiency and design quality. Vanda northwest engineering design and research institute co., LTD., the scientific research office building project in combination with the practical situation of engineering using BIM technology, formed in the BIM model combined with related information according to the energy energy model (BEM) and the application of BIM technology in construction management stage made exploration, and the direct experience and the achievements gained by the architectural design part made a summary.
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
NASA Astrophysics Data System (ADS)
Antonopoulos, Chrissi Argyro
This study presents findings from survey and interview data investigating replication of green building measures by Commercial Building Partnership (CBP) partners that worked directly with the Pacific Northwest National Laboratory (PNNL). PNNL partnered directly with 12 organizations on new and retrofit construction projects, which represented approximately 28 percent of the entire U.S. Department of Energy (DOE) CBP program. Through a feedback survey mechanism, along with personal interviews, quantitative and qualitative data were gathered relating to replication efforts by each organization. These data were analyzed to provide insight into two primary research areas: 1) CBP partners' replication efforts of green building approaches used in the CBP project to the rest of the organization's building portfolio, and, 2) the market potential for technology diffusion into the total U.S. commercial building stock, as a direct result of the CBP program. The first area of this research focused specifically on replication efforts underway or planned by each CBP program participant. The second area of this research develops a diffusion of innovations model to analyze potential broad market impacts of the CBP program on the commercial building industry in the United States. Findings from this study provided insight into motivations and objectives CBP partners had for program participation. Factors that impact replication include motivation, organizational structure and objectives firms have for implementation of energy efficient technologies. Comparing these factors between different CBP partners revealed patterns in motivation for constructing energy efficient buildings, along with better insight into market trends for green building practices. The optimized approach to the CBP program allows partners to develop green building parameters that fit the specific uses of their building, resulting in greater motivation for replication. In addition, the diffusion model developed for this analysis indicates that this method of market prediction may be used to adequately capture cumulative construction metrics for a whole-building analysis as opposed to individual energy efficiency measures used in green building.
Seaview/Westshores High School Gymnasium & Classroom Building, Salton City, California.
ERIC Educational Resources Information Center
Design Cost Data, 2001
2001-01-01
Presents design, construction, and cost data for Salton City, California's, Seaview/Westshores High School Gymnasium and Classroom Building, which is being utilized by the school and surrounding community. Includes a list of project manufacturers and suppliers, along with five photographs and two floor plans. (GR)
What the Building Boom Says about Campus Values
ERIC Educational Resources Information Center
Bonfiglio, Robert A.
2004-01-01
Some construction projects that colleges and universities have recently undertaken--residence halls, dining halls, student centers, athletic and recreation centers--have attracted significant criticism. Critics have taken issue with the proliferation and design of buildings intended to structure the use of students' free time and attract…
36 CFR § 1210.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-07-01
... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...
14 CFR 1260.123 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-01-01
... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
36 CFR 1210.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-07-01
... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...
14 CFR 1260.123 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
14 CFR 1260.123 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-01-01
... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
14 CFR 1260.123 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-01-01
... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...
36 CFR 1210.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-07-01
... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...
36 CFR 1210.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-07-01
... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...
Expanding uses of building information modeling in life-cycle construction projects.
Hannele, Kerosuo; Reijo, Miettinen; Tarja, Mäki; Sami, Paavola; Jenni, Korpela; Teija, Rantala
2012-01-01
BIM is targeted at providing information about the entire building and a complete set of design documents and data stored in an integrated database. In this paper, we study the use of BIM in two life-cycle construction projects in Kuopio, Finland during 2011. The analysis of uses of BIM and their main problems will constitute a foundation for an intervention. We will focus on the following questions: (1) How different partners use the composite BIM model? (2) What are the major contradictions or problems in the BIM use? The preliminary findings reported in this study show that BIM has been adopted quite generally to design use but the old ways of collaboration seem to prevail, especially between designers and between designers and building sites. BIM has provided new means and demands for collaboration but expansive uses of BIM for providing new interactive processes across professional fields have not much come true.
2011-01-20
CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett
2011-01-20
CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett
Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
... assistance from RUS for the construction of the proposed Project. RUS is considering funding the proposed... effect of the proposed Project on historic properties; i.e., buildings, structures, sites, objects and... responsibilities to take into account effects to historic properties. RUS has determined that the proposed project...
Construction of energy-stable Galerkin reduced order models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalashnikova, Irina; Barone, Matthew Franklin; Arunajatesan, Srinivasan
2013-05-01
This report aims to unify several approaches for building stable projection-based reduced order models (ROMs). Attention is focused on linear time-invariant (LTI) systems. The model reduction procedure consists of two steps: the computation of a reduced basis, and the projection of the governing partial differential equations (PDEs) onto this reduced basis. Two kinds of reduced bases are considered: the proper orthogonal decomposition (POD) basis and the balanced truncation basis. The projection step of the model reduction can be done in two ways: via continuous projection or via discrete projection. First, an approach for building energy-stable Galerkin ROMs for linear hyperbolicmore » or incompletely parabolic systems of PDEs using continuous projection is proposed. The idea is to apply to the set of PDEs a transformation induced by the Lyapunov function for the system, and to build the ROM in the transformed variables. The resulting ROM will be energy-stable for any choice of reduced basis. It is shown that, for many PDE systems, the desired transformation is induced by a special weighted L2 inner product, termed the %E2%80%9Csymmetry inner product%E2%80%9D. Attention is then turned to building energy-stable ROMs via discrete projection. A discrete counterpart of the continuous symmetry inner product, a weighted L2 inner product termed the %E2%80%9CLyapunov inner product%E2%80%9D, is derived. The weighting matrix that defines the Lyapunov inner product can be computed in a black-box fashion for a stable LTI system arising from the discretization of a system of PDEs in space. It is shown that a ROM constructed via discrete projection using the Lyapunov inner product will be energy-stable for any choice of reduced basis. Connections between the Lyapunov inner product and the inner product induced by the balanced truncation algorithm are made. Comparisons are also made between the symmetry inner product and the Lyapunov inner product. The performance of ROMs constructed using these inner products is evaluated on several benchmark test cases.« less
DOT National Transportation Integrated Search
2014-08-01
The goal of everyone in the transportation community is to build bridges : that are economic, easy to construct, and durable. Therefore, accelerating : bridge construction through the use of precast concrete or prefabricated : steel girders is a comm...
ERIC Educational Resources Information Center
Crawford, Gary N.
1995-01-01
Planning new construction is an opportunity to recognize indoor environmental quality (IEQ) issues. Provides an overview of some common IEQ issues associated with construction projects. A building's heating, ventilating, and air-conditioning (HVAC) system is by far the single most common cause of IEQ problems and complaints. (MLF)
Evaluation of Supply Chain Management Systems Used in Civil Engineering
NASA Astrophysics Data System (ADS)
Tomczak, Michał; Rzepecki, Łukasz
2017-10-01
One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.
ERIC Educational Resources Information Center
Roark, Steven
2001-01-01
Presents the fifth installment examining the expansion and renovation project of Longview Community College's Liberal Arts Building in Kansas City (Missouri). Reviewed are the gaining of final approvals from administrators on project plans and the detailing of wall construction, structural systems, HVAC units, and finishes. (GR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing to construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. 12 refs., 5 tabs.« less
Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method
NASA Astrophysics Data System (ADS)
Alptekin, Orkun; Alptekin, Nesrin
2017-10-01
Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy... construction and operation of the nuclear facility portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos...
ERIC Educational Resources Information Center
Smith, Dwight; And Others
This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…
Don't Take Marketing for "Grant"ed: Building Marketing Efforts into Library Grant Initiatives
ERIC Educational Resources Information Center
Germain, Carol Anne
2009-01-01
Libraries frequently apply for grants to help fund special projects and resources, such as purchases for library collections, innovative instructional technologies, and research subscription databases. Grants provide support for cultural events, professional development sessions, new construction, and building renovations. Like other library…
22 CFR 518.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...
22 CFR 518.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...
45 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-10-01
... applicable cost principles. If the HHS awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost..., buildings and land for which title passes to the recipient may differ according to the purpose of the award...
45 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-10-01
... applicable cost principles. If the HHS awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost..., buildings and land for which title passes to the recipient may differ according to the purpose of the award...
22 CFR 518.23 - Cost sharing or matching.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...
22 CFR 518.23 - Cost sharing or matching.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...
45 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2011 CFR
2011-10-01
... applicable cost principles. If the HHS awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost..., buildings and land for which title passes to the recipient may differ according to the purpose of the award...
45 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2013 CFR
2013-10-01
... applicable cost principles. If the HHS awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost..., buildings and land for which title passes to the recipient may differ according to the purpose of the award...
45 CFR 74.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-10-01
... applicable cost principles. If the HHS awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost..., buildings and land for which title passes to the recipient may differ according to the purpose of the award...
22 CFR 518.23 - Cost sharing or matching.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...
Life Cycle Cost Analysis Handbook. First Edition.
ERIC Educational Resources Information Center
Alaska State Dept. of Education and Early Development, Juneau.
This handbook presents guidelines on the Life Cycle Cost Analysis (LCCA) of building operations over the life of a building to assist school districts and consultants with evaluating proposed educational facility construction projects. It defines the terminology found in an LCCA, such as initial and future expenses, residual value, real discount…
NASA Astrophysics Data System (ADS)
Yaakob, Mazri; Ali, Wan Nur Athirah Wan; Radzuan, Kamaruddin
2016-08-01
Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions. This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study. The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs. Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torcellini, Paul A; Eley, Charles; Gupta, Smita
Recently, zero net energy (ZNE) buildings have moved from state-of-the-art small project demonstrations to a more widely adopted approach across the country among various building types and sizes. States such as California set policy goals of all new residential construction to be NZE by 2020 and all commercial buildings to be NZE by 2030. However, the market for designing, constructing, and operating ZNE buildings is still relatively small. We bring together distinguished experts to share their thoughts on making ZNE buildings more widespread and mainstream from a broad perspective, including governments, utilities, energy-efficiency research institutes, and building owners. This conversationmore » also presents the benefits of ZNE and ways to achieve that goal in the design and operation of buildings. The following is a roundtable conducted by ASHRAE Journal and Bing Liu with Charles Eley, Smita Gupta, Cathy Higgins, Jessica Iplikci, Jon McHugh, Michael Rosenberg, and Paul Torcellini.« less
Identifying challenges in project consultants engagement practices
NASA Astrophysics Data System (ADS)
Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul
2017-10-01
Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.
Heinrich, Katie M; Lightner, Joseph; Oestman, Katherine B; Hughey, S Morgan; Kaczynski, Andrew T
2014-11-26
Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Sunflower's funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health.
LSCA Builds Michigan Libraries.
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This report highlights 19 of the 48 recently completed public library construction projects in Michigan which received partial funding from the 1983 Emergency Jobs Act. The grants were administered under Title II of the Library Services and Construction Act (LSCA). Introductory material includes listings of the State of Michigan Legislative…
NASA Astrophysics Data System (ADS)
Kolobova, Svetlana
2018-03-01
As you know, high-rise construction is an indicator of the practical implementation of advanced innovative technologies in the construction industry of the country. High-rise building inevitably comes to the big cities, in connection with the shortage and value of land. The life cycle of any construction project, including high-rise buildings consists of chains: of engineering survey - design-construction-operation. In the process of operation of a tall building, decisions about major repairs or reconstruction of a building are made for decision-making on further use. This article describes methods of assessing the consumer quality of high-rise residential buildings and the establishment of prices based on consumer characteristics of a tall residential building. It is proposed to assess the premises under their quality characteristics. The study was conducted to establish the influence of individual, comprehensive and integral indicators of comparable quality for effective quality living spaces. Simultaneously, there was established a relationship of quality with the consumer cost of housing, ultimately with the potential needs of owners, tenants of the home, lessor dwelling, or buyers of residential properties and other participants in the residential real estate market. This relationship further creates consumer requirements to quality standard of premises at a certain stage of socio-economic development.
Build an oven, cook a meal: How solar energy empowered women in Costa Rica
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blankenship, J.
1990-12-01
A pilot solar cooking project in the hot, northern province of Guanacaste promises to serve as a model for community groups wanting to build their own solar ovens. An $8,000 (US) grant has been awarded by the Canadian Embassy in Costa Rica to take the Guanacaste project into a second stage in 1990-91. Two construction workshops, with twelve participants in each, are planned in communities near Oriente. Three women from the Oriente group will have paid jobs as organizational facilitators and workshop supervisors. In popular education this is called the multiplier effect - the users of solar cookers construct themore » ovens themselves, and then instruct others to do the same. 3 refs.« less
Use of formwork systems in high-rise construction
NASA Astrophysics Data System (ADS)
Kurakova, Oksana
2018-03-01
Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2011-04-01
Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identifiedmore » a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.« less
Methodology for determining the investment attractiveness of construction of high-rise buildings
NASA Astrophysics Data System (ADS)
Nezhnikova, Ekaterina; Kashirin, Valentin; Davydova, Yana; Kazakova, Svetlana
2018-03-01
The article presents the analysis of the existing methods for assessing the investment attractiveness of high-rise construction. The authors determined and justified the primary choice of objects and territories that are the most attractive for the development of high-rise construction. A system of risk indicators has been developed that allow making a quantitative adjustment for a particular project in the evaluation of the efficiency of investment projects. The study is aimed at developing basic methodological concepts for a comparative evaluation of the prospects of construction of high-rise facilities that allow to take into consideration the features of investment in construction and to enable quantitative evaluation of the investment effectiveness in high-rise construction.
Two-stage commercial evaluation of engineering systems production projects for high-rise buildings
NASA Astrophysics Data System (ADS)
Bril, Aleksander; Kalinina, Olga; Levina, Anastasia
2018-03-01
The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.
Design and Evaluation of a DIY Construction System for Educational Robot Kits
ERIC Educational Resources Information Center
Vandevelde, Cesar; Wyffels, Francis; Ciocci, Maria-Cristina; Vanderborght, Bram; Saldien, Jelle
2016-01-01
Building a robot from scratch in an educational context can be a challenging prospect. While a multitude of projects exist that simplify the electronics and software aspects of a robot, the same cannot be said for construction systems for robotics. In this paper, we present our efforts to create a low-cost do-it-yourself construction system for…
ERIC Educational Resources Information Center
Mooney, Sharon Lopez
The West Marin Literacy Project, a project of the Marin County Free Library (San Rafael, California), involved recruitment, retention, coalition building, public awareness, training, rural oriented, tutoring, computer- assisted, intergenerational/family, and English as a Second Language (ESL) programs. The project served a community of under…
2011-01-01
ER D C TR -0 6- 10 , S up pl em en t 2 Building Information Modeling ( BIM ) Roadmap Supplement 2 – BIM Implementation Plan for Military...release; distribution is unlimited. ERDC TR-06-10, Supplement 2 January 2011 Building Information Modeling ( BIM ) Roadmap Supplement 2 – BIM ...ERDC TR-06-10, Supplement 2 (January 2011) 2 Abstract: Building Information Modeling ( BIM ) technology provides the communities of practice in
NASA Astrophysics Data System (ADS)
Herrera, D.; Bennadji, A.
2013-07-01
In order to achieve the CO2 reduction targets set by the Scottish government, it will be necessary to improve the energy efficiency of existing buildings. Within the total Scottish building stock, historic and traditionally constructed buildings are an important proportion, in the order of 19 % (Curtis, 2010), and represent cultural, emotional and identity values that should be protected. However, retrofit interventions could be a complex operation because of the several aspects that are involved in the hygrothermal performance of traditional buildings. Moreover, all these factors interact with each other and therefore need to be analysed as a whole. Upgrading the envelope of traditional buildings may produce severe changes to the moisture migration leading to superficial or interstitial condensation and thus fabric decay and mould growth. Retrofit projects carried out in the past have failed because of the misunderstanding, or the lack of expert prediction, of the potential consequences associated to the envelope's alteration. The evaluation of potential risks, prior to any alteration on building's physics in order to improve its energy efficiency, is critical to avoid future damage on the wall's performance or occupants' health and well being. The aim of this PhD research project is to point out the most critical aspects related to the energy efficiency improvement of traditional buildings and to develop a risk based methodology that helps owners and practitioners during the decision making process.
Radiology Architecture Project Primer.
Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott
2017-12-19
The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Solar 2 Green Energy, Arts & Education Center. Final Scientific/Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paquette, Jamie C; Collins, Christopher J
The Solar 2 Green Energy, Arts and Education Center is an 8,000 sq.ft. demonstration project that will be constructed to Platinum LEED certification and will be the first carbon-neutral, net-zero energy use public building in New York City, giving it local and national appeal. Employing green building features and holistic engineering practices throughout its international award-winning design, Solar 2 will be powered by a 90kW photovoltaic (PV) array in conjunction with a geothermal heating and cooling system and a high efficient design that seeks to reduce the overall energy load of the building. Solar 2 will replace our current 500more » sq.ft. prototype facility - known as Solar 1 - as the educational and cultural centerpiece of a five-block public greenway on the East River in Stuyvesant Cove Park, located along two acres of public riverfront on a newly reclaimed, former brownfield in lower Manhattan. Designed as a public-use complex for year-round environmental education exhibits and onsite activities for all ages and backgrounds, Solar 2 will demonstrate energy-efficiency technologies and sustainable environmental practices available now to all urban residents, eco-tourists, teachers, and students alike. Showcasing one of Solar 2's most striking design elements is the PV roof array with a cafe and river vistas for miles of New York City's skylines. Capping the building as a solar-powered landmark, and visible from the FDR Drive, the PV array is also designed to provide visitors below a view of the solar roof when standing outside, as well as directly underneath it. Recognized by an international jury of architects, civil engineers and urban designers by the Swiss-based Holcim Foundation, the Solar 2 design was awarded the prestigious Holcim North American 2008 Gold Award for Sustainable Construction for innovative, future-oriented and tangible sustainable construction projects, selected from more than 1900 entries. Funding from the Department of Energy was provided to assist with the ongoing design work of Solar 2, including architecture, engineering and the development of construction specifications. The work performed during the project period brought this process as far along as it could go pending the raising of funds to begin construction of the building. Once those funds are secured, we will finalize any additional details needed before beginning the bidding process and then moving into construction. DOE's funding was extremely valuable in helping Solar One determine the feasibility of a net-zero construction on the site and allowed for the design to project to meet the high standards necessary for LEED Platinum status.« less
ERIC Educational Resources Information Center
Waters, John K.
2008-01-01
It was the perfect Halloween project. Each class would construct a three-dimensional "monster" out of common classroom materials (construction paper, cardboard boxes, tape, markers, glue, string, etc.), then write down instructions for building the monster and send them off to another class in the district, or in some other district, or even some…
7 CFR 1726.125 - Generating plant facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...
7 CFR 1726.125 - Generating plant facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...
7 CFR 1726.125 - Generating plant facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower shall use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract forms or written purchase order forms for...
7 CFR 1726.125 - Generating plant facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...
7 CFR 1726.125 - Generating plant facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower shall use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract forms or written purchase order forms for...
"Getting the College Union Building Project Under Way." A Seminar.
ERIC Educational Resources Information Center
Butts, Porter
In this speech, the author provides some guidelines covering student union construction for those administrators contemplating the construction of such a facility. The recommendations and information presented cover (1) the organization and functions of an official "union planning committee;" (2) a survey of local needs regarding facilities to be…
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... specifications for transmission construction projects which are not based on RUS approved line design data or do... section, plans and specifications for transmission construction which use previously approved design data... transformer, and the transmission switchyard at a generating plant. Warehouses and equipment service buildings...
7 CFR 1944.406 - Prohibited use of grant funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.406... construction work for participating families in the self-help projects. (b) Buying real estate or building... which should be the responsibility of the participating families in the self-help projects. (d) Paying...
ERIC Educational Resources Information Center
Steinberg, Alan; And Others
This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty-one learning modules are organized into nine units: grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged furniture;…
Students' Perceptions of BIM Education in the Higher Education Sector: A UK and US Perspective
ERIC Educational Resources Information Center
Shelbourn, M.; Macdonald, J.; McCuen, T.; Lee, S.
2017-01-01
The use of building information modelling (BIM) has increased in the global architecture, engineering, construction and owner-operated (AECO) industries. This increased use has contributed to a recognition by project stakeholders of its importance across the building life cycle, leading higher education institutions to rethink their AECO…
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
Complex analysis of energy efficiency in operated high-rise residential building: Case study
NASA Astrophysics Data System (ADS)
Korniyenko, Sergey
2018-03-01
Energy conservation and human thermal comfort enhancement in buildings is a topical issue of modern architecture and construction. The innovative solution of this problem makes it possible to enhance building ecological and maintenance safety, to reduce hydrocarbon fuel consumption, and to improve life standard of people. The requirements to increase of energy efficiency in buildings should be provided at all the stages of building's life cycle that is at the stage of design, construction and maintenance of buildings. The research purpose is complex analysis of energy efficiency in operated high-rise residential building. Many actions for building energy efficiency are realized according to the project; mainly it is the effective building envelope and engineering systems. Based on results of measurements the energy indicators of the building during annual period have been calculated. The main reason of increase in heat losses consists in the raised infiltration of external air in the building through a building envelope owing to the increased air permeability of windows and balcony doors (construction defects). Thermorenovation of the building based on ventilating and infiltration heat losses reduction through a building envelope allows reducing annual energy consumption. Energy efficiency assessment based on the total annual energy consumption of building, including energy indices for heating and a ventilation, hot water supply and electricity supply, in comparison with heating is more complete. The account of various components in building energy balance completely corresponds to modern direction of researches on energy conservation and thermal comfort enhancement in buildings.
NASA Astrophysics Data System (ADS)
Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos
2015-06-01
Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.
Development of a Knowledge-Based System Approach for Decision Making in Construction Projects
1992-05-01
a generic model for an administrative facility and medical facility with predefined fixed building systems based on Air Force criteria and past...MAINTENANCE HANGAR (MEDIUM BAY) CORROSION CONTROL HANGAR (HIGH BAY) FUEL SYSTEM MAINTENANCE HANGAR (MEDIUM BAY) MEDICAL MODEL 82 Table 5-1--continued...BUILDING SUPPORT MEDICAL LOGISTICS MEDICAL TOTAL 85 Table 5-2--continued MISSILE ASSEMBLY AND MAINTENANCE BUILDING TOTAL MISSILE LOADING AND UNLOADING
Construction of energy-stable projection-based reduced order models
Kalashnikova, Irina; Barone, Matthew F.; Arunajatesan, Srinivasan; ...
2014-12-15
Our paper aims to unify and extend several approaches for building stable projection-based reduced order models (ROMs) using the energy method and the concept of “energy-stability”. Attention is focused on linear time-invariant (LTI) systems. First, an approach for building energy stable Galerkin ROMs for linear hyperbolic or incompletely parabolic systems of partial differential equations (PDEs) using continuous projection is proposed. The key idea is to apply to the system a transformation induced by the Lyapunov function for the system, and to build the ROM in the transformed variables. The result of this procedure will be a ROM that is energy-stablemore » for any choice of reduced basis. It is shown that, for many PDE systems, the desired transformation is induced by a special inner product, termed the “symmetry inner product”. Next, attention is turned to building energy-stable ROMs via discrete projection. A discrete counterpart of the continuous symmetry inner product, termed the “Lyapunov inner product”, is derived. Moreover, it is shown that the Lyapunov inner product can be computed in a black-box fashion for a stable LTI system ari sing from the discretization of a system of PDEs in space. Projection in this inner product guarantees a ROM that is energy-stable, again for any choice of reduced basis. Connections between the Lyapunov inner product and the inner product induced by the balanced truncation algorithm are made. We also made comparisons between the symmetry inner product and the Lyapunov inner product. Performance of ROMs constructed using these inner products is evaluated on several benchmark test cases.« less
Building Bridges: A Study of Coordination in Projects
ERIC Educational Resources Information Center
Hemphill, Libby Marie
2009-01-01
In our efforts to understand how collaborative work can be accomplished, we often turn to discussions of "coordination" for help. However, the concept of coordination is inadequate for explaining the many interdependent processes at work within successful collaborations. In this dissertation, I examined a collaborative construction project--the…
Recommendations to Improve Space Projection Models and University Space Usage
ERIC Educational Resources Information Center
Stigall, Sam W.
2007-01-01
In today"s economy, public university administrators need to reflect on current practices for reporting and projecting space requirements to government entities as the cost of constructing new facilities or renovating space rises while income from legislative appropriations diminishes. As stewards of public buildings and funds, institutions…
ERIC Educational Resources Information Center
MacCabe, Bruce
The Literacy Learning Center Project, a project of the Meriden Public Library (Connecticut), targeted the educationally underserved and functionally illiterate, and involved recruitment, retention, space renovation, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted services, and…
Decisive management in selecting locations for development of construction projects
NASA Astrophysics Data System (ADS)
Szafranko, E.; Pawłowicz, J. A.
2017-08-01
The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Management and Protection of Wetlands; Executive Order 12699, Seismic Safety of Federal and Federally Assisted or Regulated New Building Construction; 44 CFR part 10, Environmental Considerations; and any...
Static Frequency Converter System Installed and Tested
NASA Technical Reports Server (NTRS)
Brown, Donald P.; Sadhukhan, Debashis
2003-01-01
A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.
Commercial Building Partnerships Replication and Diffusion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Antonopoulos, Chrissi A.; Dillon, Heather E.; Baechler, Michael C.
2013-09-16
This study presents findings from survey and interview data investigating replication efforts of Commercial Building Partnership (CBP) partners that worked directly with the Pacific Northwest National Laboratory (PNNL). PNNL partnered directly with 12 organizations on new and retrofit construction projects, which represented approximately 28 percent of the entire U.S. Department of Energy (DOE) CBP program. Through a feedback survey mechanism, along with personal interviews, PNNL gathered quantitative and qualitative data relating to replication efforts by each organization. These data were analyzed to provide insight into two primary research areas: 1) CBP partners’ replication efforts of technologies and approaches used inmore » the CBP project to the rest of the organization’s building portfolio (including replication verification), and, 2) the market potential for technology diffusion into the total U.S. commercial building stock, as a direct result of the CBP program. The first area of this research focused specifically on replication efforts underway or planned by each CBP program participant. Factors that impact replication include motivation, organizational structure and objectives firms have for implementation of energy efficient technologies. Comparing these factors between different CBP partners revealed patterns in motivation for constructing energy efficient buildings, along with better insight into market trends for green building practices. The second area of this research develops a diffusion of innovations model to analyze potential broad market impacts of the CBP program on the commercial building industry in the United States.« less
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
Competency-Based Preservice Construction Trades Curriculum, Phase II. Final Report.
ERIC Educational Resources Information Center
Nelms, Howard F.
A two-phase curriculum project was undertaken in Illinois to develop, test, and implement a two-year competency-based model for the education of secondary school building construction teachers in the area of residential structures. During the first contract period, skill and knowledge competencies were identified and validated for thirteen units…
77 FR 2082 - Notice of Inventory Completion: Minnesota Indian Affairs Council, Bemidji, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
.... The remains were removed during construction of a building and subsequently transferred to Bemidji.... At an unknown date, human remains representing, at minimum, one individual were recovered from a road construction project on Hwy 197 in Beltrami County, MN, and transferred to the Minnesota Office of the State...
Creswell's Energy Efficient Construction Program: A Big Project for a Small School.
ERIC Educational Resources Information Center
Kelsh, Bruce
1982-01-01
In Creswell (Oregon) High School's award winning vocational education program, students study energy efficient construction along with basic building skills. Part of the program has been the active recruitment of female, minority, disadvantaged, and handicapped students into the vocational area. Students have assembled solar hot water collectors,…
Defending A+: how to maintain a high credit rating during a facilities overhaul.
Ollie, Ed; Kolb-Collier, Deborah; Clay, Scott
2007-11-01
To defend its strong credit rating, New Hanover Regional Medical Center: Demonstrated a clear and cohesive vision. Improved short-term financial performance. Developed robust financial projections. Avoided reliance on a "build it and they will come" strategy. Managed construction cost risks. Minimized construction disruption. Anticipated financial market concerns and questions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Britt, Michelle L.; Baechler, Michael C.; Gilbride, Theresa L.
2011-03-01
This guide is a resource to help contractors renovate historic houses, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. The best practices described in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. The guide is available for download from the DOE Building America website www.buildingamerica.gov.
Heinrich, Katie M.; Lightner, Joseph; Oestman, Katherine B.; Kaczynski, Andrew T.
2014-01-01
Introduction Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. Methods In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Results Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Conclusion Sunflower’s funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health. PMID:25427316
Building a pipeline of talent for operating radio observatories
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-07-01
The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.
Measure Guideline. Incorporating Thick Layers of Exterior Rigid Insulation on Walls
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lstiburek, Joseph; Baker, Peter
This measure guideline, written by the U.S. Department of Energy’s Building America team Building Science Corporation, provides information about the design and construction of wall assemblies that use layers of rigid exterior insulation thicker than 1-½ in. and that require a secondary cladding attachment location exterior to the insulation. The guideline is separated into several distinct sections that cover: (1) fundamental building science principles relating to the use of exterior insulation on wall assemblies; (2) design principles for tailoring this use to the specific project goals and requirements; and (3) construction detailing to increase understanding about implementing the various designmore » elements.« less
Benefit Evaluation of Implementing BIM in Construction Projects
NASA Astrophysics Data System (ADS)
Chou, Hui-Yu; Chen, Pei-Yu
2017-10-01
Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.
DOT National Transportation Integrated Search
2010-02-01
State highway authorities routinely examine the quality of the materials used to build highway construction projects. Some : materials are tested, some are accepted through a manufacturers certification of quality or compliance, some are physicall...
Renovating, Building, Expanding...Trying to Catch Up.
ERIC Educational Resources Information Center
Educational Record, 1989
1989-01-01
A collection of captioned photographs illustrates the range of campus construction needs, projects, and considerations in current efforts to catch up with the results of deferred maintenance and improvement. (MSE)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Patrick; Im, Piljae
2012-04-01
Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first costmore » of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.« less
From a philanthropic idea to building of civic hospital in Split in light of new archival evidence.
Brisky, Livia; Fatović-Ferencić, Stella
2006-02-01
We investigated the circumstances of building of the Civic Hospital in Split in the light of new archival evidence. The study necessitated a thorough review of the older historiography and previously unpublished archival sources kept in the State Archives in Venice and Zadar. The findings showed that construction of the hospital building finished in 1797, ie, five years later than officially cited. The topographical plan and the original project of the Split Civic Hospital were found, as well as the name of the project's author and the building supervisor. The data on the earliest efforts of Ergovac brothers to acquire land and building permission were corrected. The study revealed a recognizable pattern in the attitude of the authorities toward the establishment of a hospital at the end of 18th century.
NASA Astrophysics Data System (ADS)
Rogacheva, Yana; Panenkov, Andrey; Petrikova, Zinaida; Nezhnikova, Ekaterina
2018-03-01
Improving the quality of high-rise buildings under modern conditions should be based not only on compliance with the norms of technical regulations, but also on ensuring energy efficiency, environmental friendliness, and intellectuality, which can be achieved only through the introduction of innovations at all stages of the life cycle of the investment project. Authors of this article justified the need for a mechanism of technological and price audit of projects. They also suggested the model of life cycle of organizational and economic changes, connected with implantation of the mechanism of projects audit. They showed innovation character of ecological high-rise construction for the whole life cycle. Authors also made proposals to change the audit system for high-rise construction projects in the focus of its environmental friendliness.
Keys, Yolanda; Silverman, Susan R; Evans, Jennie
2017-10-01
The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.
Construction of a Solid State Research Facility, Building 3150. Environmental Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-07-01
The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration ofmore » the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems.« less
BIM and IoT: A Synopsis from GIS Perspective
NASA Astrophysics Data System (ADS)
Isikdag, U.
2015-10-01
Internet-of-Things (IoT) focuses on enabling communication between all devices, things that are existent in real life or that are virtual. Building Information Models (BIMs) and Building Information Modelling is a hype that has been the buzzword of the construction industry for last 15 years. BIMs emerged as a result of a push by the software companies, to tackle the problems of inefficient information exchange between different software and to enable true interoperability. In BIM approach most up-to-date an accurate models of a building are stored in shared central databases during the design and the construction of a project and at post-construction stages. GIS based city monitoring / city management applications require the fusion of information acquired from multiple resources, BIMs, City Models and Sensors. This paper focuses on providing a method for facilitating the GIS based fusion of information residing in digital building "Models" and information acquired from the city objects i.e. "Things". Once this information fusion is accomplished, many fields ranging from Emergency Response, Urban Surveillance, Urban Monitoring to Smart Buildings will have potential benefits.
Study on smart city construction of Jiujiang based on IOT technology
NASA Astrophysics Data System (ADS)
Liu, Zeliang; Wang, Ying; Xu, Qin; Yan, Tao
2017-06-01
At present, with the technology of the Internet of things (IOT), building smart city is forming a powerful wave of city, which promotes economic and social development of city. This paper expounds the connotation of smart city, explores the social and economic significance of the construction of smart city, analyzes the present situation of smart city construction in Jiujiang, studies the basic principles development altar get and key construction projects, and puts forward relevant of Jiujiang smart city construction, and puts forward relevant proposals about smart construction in Jiujiang, Jiangxi.
Sustainable Building in China -- A Green Leap Forward?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diamond, Richard; Ye, Qing; Feng, Wei
2013-09-01
China is constructing new commercial buildings at an enormous rate -- roughly 2 billion square meters per year, with considerable interest and activity in green design and construction. We review the context of commercial building design and construction in China, and look at a specific project as an example of a high performance, sustainable design, the Shenzhen Institute of Building Research (IBR). The IBR building incorporates over 40 sustainable technologies and strategies, including daylighting, natural ventilation, gray-water recycling, solar-energy generation, and highly efficient Heating Ventilation and Air Conditioning (HVAC) systems. We present measured data on the performance of the building,more » including detailed analysis by energy end use, water use, and occupant comfort and satisfaction. Total building energy consumption in 2011 was 1151 MWh, with an Energy Use Intensity (EUI) of 63 kWh/m 2 (20 kBtu/ft 2), which is 61% of the mean EUI value of 103 kWh/m 2 (33 kBtu/ft 2) for similar buildings in the region. We also comment on the unique design process, which incorporated passive strategies throughout the building, and has led to high occupant satisfaction with the natural ventilation, daylighting, and green patio work areas. Lastly we present thoughts on how the design philosophy of the IBR building can be a guide for low-energy design in different climate regions throughout China and elsewhere.« less
Optimizing Energy Consumption in Building Designs Using Building Information Model (BIM)
NASA Astrophysics Data System (ADS)
Egwunatum, Samuel; Joseph-Akwara, Esther; Akaigwe, Richard
2016-09-01
Given the ability of a Building Information Model (BIM) to serve as a multi-disciplinary data repository, this paper seeks to explore and exploit the sustainability value of Building Information Modelling/models in delivering buildings that require less energy for their operation, emit less CO2 and at the same time provide a comfortable living environment for their occupants. This objective was achieved by a critical and extensive review of the literature covering: (1) building energy consumption, (2) building energy performance and analysis, and (3) building information modeling and energy assessment. The literature cited in this paper showed that linking an energy analysis tool with a BIM model helped project design teams to predict and create optimized energy consumption. To validate this finding, an in-depth analysis was carried out on a completed BIM integrated construction project using the Arboleda Project in the Dominican Republic. The findings showed that the BIM-based energy analysis helped the design team achieve the world's first 103% positive energy building. From the research findings, the paper concludes that linking an energy analysis tool with a BIM model helps to expedite the energy analysis process, provide more detailed and accurate results as well as deliver energy-efficient buildings. The study further recommends that the adoption of a level 2 BIM and the integration of BIM in energy optimization analyse should be made compulsory for all projects irrespective of the method of procurement (government-funded or otherwise) or its size.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tom Anderson; David Culler; James Demmel
2000-02-16
The goal of the Castle project was to provide a parallel programming environment that enables the construction of high performance applications that run portably across many platforms. The authors approach was to design and implement a multilayered architecture, with higher levels building on lower ones to ensure portability, but with care taken not to introduce abstractions that sacrifice performance.
45 CFR 2102.13 - Project eligibility criteria for placement on a Consent Calendar.
Code of Federal Regulations, 2010 CFR
2010-10-01
... according to § 2102.14. (a) Additions to buildings of less than 25 percent (%) of the original structure and... projects; (d) Cellular or other communications antenna installations or replacements; (e) New or... materials; (g) Temporary utility or construction structures; (h) And does not include new physical perimeter...
Bayesian-network-based safety risk assessment for steel construction projects.
Leu, Sou-Sen; Chang, Ching-Miao
2013-05-01
There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Gongalo, Boris; Gudovicheva, Lubov; Gubareva, Anna; Dobrynina, Larisa
2018-03-01
The issues of constructing high-rise, primarily residential, buildings have a great social significance. Not every plot of land, acquired in the Russian Federation is suitable for high-rise construction. Therefore, every construction company that plans to erect a multi-apartment building, a high-rise office building, or a skyscraper must take into account not only technical norms but as well sanitary legislation regulations that set obligatory requirements about insolation of apartments. The article includes a short study of several norms in the Russian legislation regarding insolation of dwellings; analises the problems of judicial interpretation of the statutory limitations. In this aspect it researches the debatable questions arising in practice of state arbitration courts dealing with the lawsuits on allocation of land-plots by the local administration. The analysis of the judicial practice is followed by description of the difficulties facing the developers of land-plots, concerning the project and territorial planning documentation.
Conducting experimental investigations of wind influence on high-rise constructions
NASA Astrophysics Data System (ADS)
Poddaeva, Olga I.; Fedosova, Anastasia N.; Churin, Pavel S.; Gribach, Julia S.
2018-03-01
The design of buildings with a height of more than 100 meters is accompanied by strict control in determining the external loads and the subsequent calculation of building structures, which is due to the uniqueness of these facilities. An important factor, the impact of which must be carefully studied at the stage of development of project documentation, is the wind. This work is devoted to the problem of studying the wind impact on buildings above 100 meters. In the article the technique of carrying out of experimental researches of wind influence on high-rise buildings and constructions, developed in the Educational-research-and-production laboratory on aerodynamic and aeroacoustic tests of building designs of NRU MGSU is presented. The publication contains a description of the main stages of the implementation of wind tunnel tests. The article presents the approbation of the methodology, based on the presented algorithm, on the example of a high-rise building under construction. This paper reflects the key requirements that are established at different stages of performing wind impact studies, as well as the results obtained, including the average values of the aerodynamic pressure coefficients, total forces and aerodynamic drag coefficients. Based on the results of the work, conclusions are presented.
ERIC Educational Resources Information Center
Kennedy, Mike
2003-01-01
Offers ten ideas for schools and universities before embarking on a new construction project: defining a school, shared space, sustainability, outdoor landscape, geoexchange, a variety of spaces, student-oriented space, technology, community use, and security. (EV)
2017-03-01
address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing
MAN-004 Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Timothy L.
2014-07-01
At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less
NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad
2012-12-31
The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department ofmore » Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following topics in the primary five-day Building Energy/Sustainability Management Certificate program in five training modules, namely: 1) Strategic Planning, 2) Sustainability Audits, 3) Information Analysis, 4) Energy Efficiency, and 5) Communication. Training Program 2 addresses the following technical topics in the two-day Building Technologies workshop: 1) Energy Efficient Building Materials, 2) Green Roofing Systems, 3) Energy Efficient Lighting Systems, 4) Alternative Power Systems for Buildings, 5) Innovative Building Systems, and 6) Application of Building Performance Simulation Software. Program 3 is a seminar which provides an overview of elements of programs 1 and 2 in a seminar style presentation designed for the general public to raise overall public awareness of energy and sustainability topics.« less
Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model
NASA Astrophysics Data System (ADS)
Zhao, Erdong; Li, Shangqi
2017-08-01
As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.
Master of the house: Why a company should take control of its building projects.
Thurm, David
2005-10-01
When you head up a big construction project for your organization, coming in on time and on budget isn't enough. If you want to avoid squandering what is probably your company's largest capital investment, it's important to create a building that reflects your company's mission and produces a truly energizing work environment, says David Thurm, CIO of the New York Times Company and head of the team responsible for designing and building the Times' new corporate headquarters in Manhattan. The only way to get this kind of package-great design and innovative features that together further your business goals- is to take an active role. Assemble the right team, and then stay involved, asking hard questions about things that are generally taken as givens. Articulate a vision of your future work space, and drive the search for ways to realize this vision. In short, be a builder, not merely an owner. It's easy to understand why this approach is the exception rather than the rule. To most companies, design and construction seem foreign and forbidding, rife with pitfalls. Because of the murkiness of the field and a lack of experience and confidence, most companies play a relatively minor role in their construction projects. But it's a giant mistake to be a passive consumer when it comes to one of your most important assets. At best, you'll get well-intentioned guesses by others as to what you want; at worst, you'll end up with a building that's at odds with your identity. The author shares a series of lessons learned. Implicit in all of them: You have to push yourself as hard as you push your contractors.
Revenue Bond Financing Auxiliary Service Facilities Construction at the State Colleges.
ERIC Educational Resources Information Center
Maryland Board of Trustees of the State Colleges, Baltimore.
Since the State of Maryland does not provide funds for the construction of dormitories, dining halls, student activities, buildings, and similar ancillary services, an outline of cost responsibilities for such facilities in the state college system is presented. Based on a discussion of the financing methods for ancillary projects, the role of the…
Code of Federal Regulations, 2010 CFR
2010-04-01
... statement of work, which identifies the work to be performed. The appropriate contracting office uses the... completing the project as advertised. (a) Payments to the winning bidder are negotiated in the contract and... the completed work. (2) Final payment will be made after final inspection and after all provisions of...
GREEN OAK AS A SUSTAINABLE BUILDING MATERIAL
Technical documentation necessary for a project demonstrating the viability of green oak as a contemporary structural material. These will include material grading guidelines, mechanical testing, architectural construction documents and details, specifications, engineering cal...
ERIC Educational Resources Information Center
Love, Paula
2012-01-01
The federal government last formally assessed the state of the nation's schools in the 1999 report "Condition of America's Public School," which estimated that it would take $127 billion to bring the nation's schools to "good condition." The American Society of Civil Engineers (ASCE) issued its own report card the same year. In…
Building Schools in a Tight Economy? Do Your Homework
ERIC Educational Resources Information Center
Watts, Chris
2009-01-01
With unemployment rising and the public more concerned about the economy than at any other time in recent memory, the idea of a municipality deciding to spend millions of dollars to build or refurbish a school seems an uphill challenge to say the least. In the best of times, voter approval for school construction projects is difficult to get;…
NASA Astrophysics Data System (ADS)
Juszczyk, Michał; Leśniak, Agnieszka; Zima, Krzysztof
2013-06-01
Conceptual cost estimation is important for construction projects. Either underestimation or overestimation of building raising cost may lead to failure of a project. In the paper authors present application of a multicriteria comparative analysis (MCA) in order to select factors influencing residential building raising cost. The aim of the analysis is to indicate key factors useful in conceptual cost estimation in the early design stage. Key factors are being investigated on basis of the elementary information about the function, form and structure of the building, and primary assumptions of technological and organizational solutions applied in construction process. The mentioned factors are considered as variables of the model which aim is to make possible conceptual cost estimation fast and with satisfying accuracy. The whole analysis included three steps: preliminary research, choice of a set of potential variables and reduction of this set to select the final set of variables. Multicriteria comparative analysis is applied in problem solution. Performed analysis allowed to select group of factors, defined well enough at the conceptual stage of the design process, to be used as a describing variables of the model.
4D modeling in high-rise construction
NASA Astrophysics Data System (ADS)
Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly
2018-03-01
High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.
NASA Astrophysics Data System (ADS)
Vasilyeva, Elena
2017-10-01
Current problems and the prospects of energy saving in Russia as well as the importance of creation of complete legislative and legal base and the mechanisms of economic incentives of energy saving is are considered in article. The analysis of the existing criteria of the energy efficiency of buildings is carried out. The introduction of so-called “road map” of the development of energy saving in housing-and-communal services is expedient. According to the author, that will allow to provide owners of buildings and the servicing companies with the information for acceptance of organizational and technical project, construction and operational decisions, reasonable decisions on maintenance, reconstruction or dismantling of the buildings, directed to lowering of energetic expenses and also to the proper organization of life cycle of buildings in general.
NASA Astrophysics Data System (ADS)
Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel
2018-03-01
One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.
Abramovo Counterterrorism Training Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hayes, Christopher M; Ross, Larry; Lingenfelter, Forrest E
2011-01-01
The U.S. government has been assisting the Russian Federation (RF) Ministry of Defense (MOD) for many years with nuclear weapons transportation security (NWTS) through the provision of specialized guard escort railcars and cargo railcars with integrated physical security and communication systems, armored transport vehicles, and armored escort vehicles. As a natural continuation of the NWTS program, a partnership has been formed to construct a training center that will provide counterterrorism training to personnel in all branches of the RF MOD. The Abramovo Counterterrorism Training Center (ACTC) is a multinational, multiagency project with funding from Canada, RF and the U.S. Departmentsmore » of Defense and Energy. ACTC will be a facility where MOD personnel can conduct basic through advanced training in various security measures to protect Category IA material against the threat of terrorist attack. The training will enhance defense-in-depth principles by integrating MOD guard force personnel into the overall physical protection systems and improving their overall response time and neutralization capabilities. The ACTC project includes infrastructure improvements, renovation of existing buildings, construction of new buildings, construction of new training facilities, and provision of training and other equipment. Classroom training will be conducted in a renovated training building. Basic and intermediate training will be conducted on three different security training areas where various obstacles and static training devices will be constructed. The central element of ACTC, where advanced training will be held, is the 'autodrome,' a 3 km road along which various terrorist events can be staged to challenge MOD personnel in realistic and dynamic nuclear weapons transportation scenarios. This paper will address the ACTC project elements and the vision for training development and integrating this training into actual nuclear weapons transportation operations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-09-01
As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA in the mixed-humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach to potential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STARmore » requirements, and a high performance heating and cooling system. Construction quality and execution was a high priority for TaC Studios and was ensured by a third party review process. Post construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowner's wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this home was evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored to determine their impact on overall energy consumption.« less
Yu, Shih-Heng; Chang, Dong-Shang
2014-01-01
This study investigates the risk factors in railway reconstruction project through complete literature reviews on construction project risks and scrutinizing experiences and challenges of railway reconstructions in Taiwan. Based on the identified risk factors, an assessing framework based on the fuzzy multicriteria decision-making (fuzzy MCDM) approach to help construction agencies build awareness of the critical risk factors on the execution of railway reconstruction project, measure the impact and occurrence likelihood for these risk factors. Subjectivity, uncertainty and vagueness within the assessment process are dealt with using linguistic variables parameterized by trapezoid fuzzy numbers. By multiplying the degree of impact and the occurrence likelihood of risk factors, estimated severity values of each identified risk factor are determined. Based on the assessment results, the construction agencies were informed of what risks should be noticed and what they should do to avoid the risks. That is, it enables construction agencies of railway reconstruction to plan the appropriate risk responses/strategies to increase the opportunity of project success and effectiveness. PMID:24772014
Large resource development projects as markets for passive solar technologies. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roze-Benson, R V
1980-12-01
A basic premise of this study is that large resource development projects provide a major market opportunity for passive solar manufactured buildings. The primary objectives of the work are to document selected resource development projects and identify their potential housing needs and development schedules, to contact resource industry representatives and assess some of the processes and motivations behind their involvement in housing decisions, and to provide passive solar manufactured buildings producers with results of these steps as early initial market intelligence. The intent is to identify not only the industries, location of their planned projects, and their likely worker housingmore » needs, but also the individuals involved in making housing-related decisions. The 56 identified projects are located within 18 states and cover 11 types of resources. The report documents individual projects, provides protections of total worker-related housing needs, and presents overviews of resource development company involvement in the new construction market. In addition, the report profiles three organizations that expressed a strong interest in implementing the use of low-cost passive solar manufactured buildings in resource-development-related activities.« less
Recovery technologies for building materials
NASA Astrophysics Data System (ADS)
Karu, Veiko; Nurme, Martin; Valgma, Ingo
2015-04-01
Mining industry provides building materials for construction. Civil engineers have settled the quality parameters for construction materials. When we produce high quality building materials from carbonate rock (limestone, dolostone), then the estimated waste share is 25% to 30%, depending on crushing principles and rock quality. The challenge is to find suitable technology for waste recovery. During international mining waste related cooperation project MIN-NOVATION (www.min-novation.eu), partners mapped possibilities for waste recovery in mining industry and pointed out good examples and case studies. One example from Estonia showed that when we produce limestone aggregate, then we produce up to 30% waste material (fines with size 0-4mm). This waste material we can see as secondary raw material for building materials. Recovery technology for this fine grained material has been achieved with CDE separation plant. During the process the plant washes out minus 63 micron material from the limestone fines. This technology allows us to use 92% of all limestone reserves. By-product from 63 microns to 4 mm we can use as filler in concrete or as fine limestone aggregate for building or building materials. MIN-NOVATION project partners also established four pilot stations to study other mineral waste recovery technologies and solutions. Main aims on this research are to find the technology for recovery of mineral wastes and usage for new by-products from mineral mining waste. Before industrial production, testing period or case studies are needed. This research is part of the study of Sustainable and environmentally acceptable Oil shale mining No. 3.2.0501.11-0025 http://mi.ttu.ee/etp and the project B36 Extraction and processing of rock with selective methods - http://mi.ttu.ee/separation; http://mi.ttu.ee/miningwaste/
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-01
The DOE proposes to authorize Washington State University (WSU) to proceed with the detailed design, construction, and equipping of the proposed Center for Advanced Industrial Processes (CAIP). The proposed project would involve construction of a three story building containing laboratories, classrooms, seminar rooms, and graduate student and administrative office space. Existing buildings would be demolished. The proposed facility would house research in thermal/fluid sciences, bioengineering, manufacturing processes, and materials processing. Under the {open_quotes}no-action{close_quotes} DOE would not authorize WSU to proceed with construction under the grant. WSU would then need to consider alternatives for proceeding without DOE funds. Such alternatives (includingmore » delaying or scaling back the project), would result in a postponement or slight reduction in the minor adverse environmental, safety and health Impacts of the project evaluated in this assessment. More importantly, these alternatives would affect the important environmental, safety, health, and programmatic benefits of the projects. The surrounding area is fully urbanized and the campus is intensely developed around the proposed site. The buildings scheduled for demolition do not meet State energy codes, are not air conditioned, and lack handicapped access. Sensitive resources (historical/archeological, protected species/critical habitats, wetlands/floodplains, national forests/parks/trails, prime farmland and special sources of water) would not be affected as they do not occur on or near the proposed site. Cumulative impacts would be small. The proposed action is not related to other actions being considered under other NEPA reviews. There is no conflict between the proposed action and any applicable Federal, State, regional or local land use plans and policies.« less
Development and validation of a building design waste reduction model.
Llatas, C; Osmani, M
2016-10-01
Reduction in construction waste is a pressing need in many countries. The design of building elements is considered a pivotal process to achieve waste reduction at source, which enables an informed prediction of their wastage reduction levels. However the lack of quantitative methods linking design strategies to waste reduction hinders designing out waste practice in building projects. Therefore, this paper addresses this knowledge gap through the design and validation of a Building Design Waste Reduction Strategies (Waste ReSt) model that aims to investigate the relationships between design variables and their impact on onsite waste reduction. The Waste ReSt model was validated in a real-world case study involving 20 residential buildings in Spain. The validation process comprises three stages. Firstly, design waste causes were analyzed. Secondly, design strategies were applied leading to several alternative low waste building elements. Finally, their potential source reduction levels were quantified and discussed within the context of the literature. The Waste ReSt model could serve as an instrumental tool to simulate designing out strategies in building projects. The knowledge provided by the model could help project stakeholders to better understand the correlation between the design process and waste sources and subsequently implement design practices for low-waste buildings. Copyright © 2016 Elsevier Ltd. All rights reserved.
1990-08-01
the guidance in this report. 1-4. Scope This guidance covers selection of projects suitable for a One-Step or Two-Step approach, development of design...conducted, focus on resolving proposal deficiencies; prices are not "negotiated" in the common use of the term. A Request for Proposal (RFP) states project ...carefully examines experience and past performance in the design of similar projects and building types. Quality of
The S-curve for forecasting waste generation in construction projects.
Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling
2016-10-01
Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Tamang, H. D.; Dharam, K. C.
Nepal is one of the poorest countries in the world. In 1981 the Education for Rural Development in Seti Zone Project--more commonly known as the "Seti Project"--was part of the Nepalese government's effort to develop a system of basic education in that far western region of Nepal. The early success of the project provided the impetus for…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, Jack C.P., E-mail: cejcheng@ust.hk; Ma, Lauren Y.H., E-mail: yingzi@ust.hk
Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R wastemore » disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.« less
Environmental Assessment Lakeview Geothermal Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Treis, Tania
2012-04-30
The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternativesmore » considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.« less
The Phase 2 proposal set out to define a number of limited research objectives to carry the project forward, based on the success of research and design carried out in Phase I through to the development and implementation of the project towards a marketable commodity for th...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... in Kansas City, Missouri. Through the project, GSA proposes to relocate its current operations from... downtown East Village development and tax increment financing (TIF) district, on the East-side of downtown... result of the construction and operation of the proposed project. GSA also evaluates a ``No Action'' and...
A Project-Based Laboratory for Learning Embedded System Design with Industry Support
ERIC Educational Resources Information Center
Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong
2010-01-01
A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
ERIC Educational Resources Information Center
Hess, Therese M.
The Martinsburg-Berkeley County Public Library (West Virginia) conducted a project that involved recruitment, retention, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted, other technology, and English as a Second Language (ESL) programs. The project served a three-county community…
A Building Development Plan at Laval University, Quebec
ERIC Educational Resources Information Center
Daoust, Gilles
2004-01-01
Laval University is launching a series of major development projects aimed at meeting the needs of an institution that currently offers over 350 academic programmes to more than 36,000 students. This article will focus on three of the most important construction projects that are already under way or about to start: the Wood Processing Centre,…
Evaluation of warm mix asphalt for Alaska conditions : [summary].
DOT National Transportation Integrated Search
2010-09-01
This project developed and tested protocols to determine concrete curing strength during the construction process, so that : building under very cold conditions can be performed safely and quickly. Researchers determined the laboratory strengthmaturi...
Impacts and benefits of implementing BIM on bridge infrastructure projects.
DOT National Transportation Integrated Search
2014-10-01
To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. : Benefits achieved through implementation in vertical construction, however, suggest that BIM represents : significant opportunity for gains in p...
Trimble Use Case Information : A Presentation to DOT Adjacent Band Compatibility Workshop #2
DOT National Transportation Integrated Search
2014-12-04
Trimble Use Case Overview: Heavy Civil Construction - Planning, Designing, Building and Operating: Enhanced information, decision making and control across the entire project lifecycle, generating benefits including: - Faster Completion - Reduced Fue...
Alternative contracting research : [project summary].
DOT National Transportation Integrated Search
2016-09-01
To conserve taxpayer money, many governmental agencies use a low-bid process for design : and construction services. The Florida Department of Transportations (FDOT) Design-Bid-Build : process falls in this category. However, a low-bid approach do...
Thinking Like a Whole Building: A Whole Foods Market New Construction Case Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deru, M.; Bonnema, E.; Doebber, I.
2011-04-01
Whole Foods Market participates in the U.S. Department of Energy's Commercial Building Partnerships (CBP) to identify and develop cost-effective, readily deployed, replicable energy efficiency measures (EEMs) for commercial buildings. Whole Foods Market is working with the National Renewable Energy Laboratory (NREL) on a retrofit and a new construction CBP project. Whole Foods Market's CBP new construction project is a standalone store in Raleigh, North Carolina. Whole Foods Market examined the energy systems and the interactions between those systems in the design for the new Raleigh store. Based on this collaboration and preliminary energy modeling, Whole Foods Market and NREL identifiedmore » a number of cost-effective EEMs that can be readily deployed in other Whole Foods Market stores and in other U.S. supermarkets. If the actual savings in the Raleigh store - which NREL will monitor and verify - match the modeling results, each year this store will save nearly $100,000 in operating costs (Raleigh's rates are about $0.06/kWh for electricity and $0.83/therm for natural gas). The store will also use 41% less energy than a Standard 90.1-compliant store and avoid about 3.7 million pounds of carbon dioxide emissions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butler, T.; Curtis, O.; Stephenson, R.
As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta-based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA, in the mixed humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach to potential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STARmore » requirements, and a high performance heating and cooling system. Construction quality and execution was a high priority for TaC Studios and was ensured by a third party review process. Post-construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowners wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this home was evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored to determine their impact on overall energy consumption.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butler, T.; Curtis, O.; Stephenson, R.
As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta-based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA in the mixed humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach topotential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STAR requirements,more » and a high performance heating and cooling system. Construction quality and execution was a high priority for TaCStudios and was ensured by a third party review process. Post-construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowners wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this homewas evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored todetermine their impact on overall energy consumption.« less
NASA Astrophysics Data System (ADS)
Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.
2017-11-01
Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.
Review and Prospect of BIM Policy in China
NASA Astrophysics Data System (ADS)
Liu, Bingsheng; Wang, Min; Zhang, Yutao; Liu, Rui; Wang, Anmin
2017-10-01
In the process of architectural design, construction, operation and maintenance, the problem of inefficiency and inaccuracy in information application and exchange has caused substantial waste of resources and risk in construction industry. Building Information Management provides an opportunity to address the issue. Building information modelling (BIM) has been increasingly applied in design, construction and other information management in China as its important role in reducing engineering changes, improving engineering quality, shortening project duration, saving project cost, enhancing information sharing among the participants many others. As an integration of process and product, its development and implementation need government regulation to enhance its applications effect and standardize its adoption and implementation. Especially, the government guidance affects the application and development of new technology to a great extent in China. However, relevant policy development falls behind the rapid development of its application in practice in China, which has led to many problems in construction practice. In order to develop effective BIM policy for China, this paper conducted a comprehensive review about existing BIM policy in China by analysing its status and problems, comparing it with the corresponding policy in developed countries such as the USA and UK. The expected policy development direction is also discussed and proposed.
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-12-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-02-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
ERIC Educational Resources Information Center
Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.
This pamphlet offers a preview of information services available from Solcost, a research and development project. The first section explains that Solcost calculates system and costs performance for solar heated and cooled new and retrofit constructions, such as residential buildings and single zone commercial buildings. For a typical analysis,…
Final Environmental Assessment for Aircraft Maintenance Operations Center
2014-06-01
short-term emissions during construction of new facilities, demolition of existing buildings, and removal of existing asphalt /concrete. There would...Repair: The existing asphalt road accessing Building 1934 would be repaired in June 2014. It is anticipated that this project would qualify for a CatEx...removal of existing asphalt /concrete. Minimal ambient air impacts from localized short-term emissions that would quickly dissipate away from the
DAG: a new observatory and a prospective observing site for other potential telescopes
NASA Astrophysics Data System (ADS)
Yeşilyaprak, Cahit; Yerli, Sinan K.; Keskin, Onur; Güçsav, B. Bülent
2016-07-01
DAG (Eastern Anatolia Observatory is read as "Doğu Anadolu Gözlemevi" in Turkish) is the newest and largest observatory of Turkey, constructed at an altitude of 3150 m in Konaklı/Erzurum provenience, with an optical and nearinfrared telescope (4 m in diameter) and its robust observing site infrastructure. This national project consists of three main phases: DAG (Telescope, Enclosure, Buildings and Infrastructures), FPI (Focal Plane Instruments and Adaptive Optics) and MCP (Mirror Coating Plant). All these three phases are supported by the Ministry of Development of Turkey and funding is awarded to Atatürk University. Telescope, enclosure and building tenders were completed in 2014, 2015 and 2016, respectively. The final design of telescope, enclosure and building and almost all main infrastructure components of DAG site have been completed; mainly: road work, geological and atmospheric surveys, electric and fiber cabling, water line, generator system, cable car to summit. This poster explains recent developments of DAG project and talks about the future possible collaborations for various telescopes which can be constructed at the site.
U.S. Team Green Building Challenge 2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2002-09-01
Flier about the U.S. Team and its projects participating in the International Green Building Challenge. Along with many other countries, the United States accepted the Green Building Challenge (GBC), an international effort to evaluate and improve the performance of buildings worldwide. GBC started out in 1996 as a competition to determine which country had the greenest buildings; it evolved into a cooperative process among the countries to measure the performance of green buildings. Although the auto industry can easily measure efficiency in terms of miles per gallon, the buildings industry has no standard way to quantify energy and environmental performance.more » The Green Building Challenge participants hope that better tools for measuring the energy and environmental performance of buildings will be an outcome of their efforts and that these tools will lead to higher and better performance levels in buildings around the world. The ultimate goal is to design, construct, and operate buildings that contribute to global sustainability by conserving and/or regenerating natural resources and minimizing nonrenewable energy use. The United States' Green Building Challenge Team '02 selected five buildings from around the country to serve as case studies; each of the five U.S. building designs (as well as all international case studies) were assessed using an in-depth evaluation tool, called the Green Building Assessment Tool (GBTool). The GBTool was specifically created and refined by international teams, for the GBC efforts. The goal of this collaborative effort is to improve this evaluation software tool so that it can be used globally, while taking into account regional and national conditions. The GBTool was used by the U.S. Team to assess and evaluate the energy and environmental performance of these five buildings: (1) Retail (in operation): BigHorn Home Improvement Center, Silverthorne, Colorado; (2) Office (in operation), Philip Merrill Environmental; (3) School (in construction), Clearview Elementary School, Hanover, Pennsylvania; (4) Multi-family residential (in construction), Twenty River Terrace, Battery Park City, New York; and (5) Office/lab (in design), National Oceanic Atmospheric Administration, Honolulu, Hawaii. These projects were selected, not only because they were good examples of high-performance buildings and had interested owners/design team members, but also because building data was available as inputs to test the software tool. Both the tool and the process have been repeatedly refined and enhanced since the first Green Building Challenge event in 1998; participating countries are continuously providing feedback to further improve the tool and global process for the greatest positive effect.« less
NASA Astrophysics Data System (ADS)
Magay, A. A.; Bulgakova, E. A.; Zabelina, S. A.
2018-03-01
The article highlights issues surrounding development of high rise buildings. With the rapid increase of the global population there has been a trend for people to migrate into megacities and has caused the expansion of big city territories. This trend, coupled with the desire for a comfortable living environment, has resulted in numerous problems plaguing the megacity. This article proposes that a viable solution to the problems facing megacities is to create vertical layout environments. Potential options for creating vertical layout environments are set out below including the construction of buildings with atriums. Further, the article puts forth suggested spatial organization of the environment as well as optimal landscaping of high-rise buildings and constructions for the creation of vertical layout environments. Finally, the persuasive reasons for the adoption of vertical layout environments is that it will decrease the amount of developed urban areas, decrease traffic and increase environmental sustainability.
NASA Technical Reports Server (NTRS)
1990-01-01
An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonnema, E.; Leach, M.; Pless, S.
2013-06-01
This Technical Support Document describes the process and methodology for the development of the Advanced Energy Design Guide for Large Hospitals: Achieving 50% Energy Savings Toward a Net Zero Energy Building (AEDG-LH) ASHRAE et al. (2011b). The AEDG-LH is intended to provide recommendations for achieving 50% whole-building energy savings in large hospitals over levels achieved by following Standard 90.1-2004. The AEDG-LH was created for a 'standard' mid- to large-size hospital, typically at least 100,000 ft2, but the strategies apply to all sizes and classifications of new construction hospital buildings. Its primary focus is new construction, but recommendations may be applicablemore » to facilities undergoing total renovation, and in part to many other hospital renovation, addition, remodeling, and modernization projects (including changes to one or more systems in existing buildings).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevron Energy Solutions; Matt Rush; Scott Shulda
Colorado Northwestern Community College (CNCC) is working collaboratively with recipient vendor Chevron Energy Solutions, an energy services company (ESCO), to develop an innovative GHP project at the new CNCC Campus constructed in 2010/2011 in Craig, Colorado. The purpose of the CNCC Craig Campus Geothermal Program scope was to utilize an energy performance contracting approach to develop a geothermal system with a shared closed-loop field providing geothermal energy to each building's GHP mechanical system. Additional benefits to the project include promoting good jobs and clean energy while reducing operating costs for the college. The project has demonstrated that GHP technology ismore » viable for new construction using the energy performance contracting model. The project also enabled the project team to evaluate several options to give the College a best value proposition for not only the initial design and construction costs but build high performance facilities that will save the College for many years to come. The design involved comparing the economic feasibility of GHP by comparing its cost to that of traditional HVAC systems via energy model, financial life cycle cost analysis of energy savings and capital cost, and finally by evaluating the compatibility of the mechanical design for GHP compared to traditional HVAC design. The project shows that GHP system design can be incorporated into the design of new commercial buildings if the design teams, architect, contractor, and owner coordinate carefully during the early phases of design. The public also benefits because the new CNCC campus is a center of education for the much of Northwestern Colorado, and students in K-12 programs (Science Spree 2010) through the CNCC two-year degree programs are already integrating geothermal and GHP technology. One of the greatest challenges met during this program was coordination of multiple engineering and development stakeholders. The leadership of Principle Investigator Pres. John Boyd of CNCC met this challenge by showing clear leadership in setting common goals and resolving conflicts early in the program.« less
NASA Astrophysics Data System (ADS)
Duarte, Isabel; Pedro, Elsa; Varum, Humberto; Mirão, José; Pinho, António
2014-05-01
After long years of war, great efforts have been made for the socio-economic development of Angola, mainly in the construction industry. Among the construction techniques, the Adobe is the most used in the province of Huambo, especially by low-income families, which constitute the majority. This technique was established as a historical heritage in the culture of that population. The Huambo province is located in the central region of Angola (Central Plateau) and is bounded on the northeast and east by the province of Bié, on the south and southern by province of Huila, and on the west by the province of Benguela and on the northwest by the province of Kwanza Sul. Has an area of 35,771 km2 and approximately 2,301,524 inhabitants, which corresponds to 58 inhabitants per km2 (Government of the Province of Huambo, 2006). The buildings in this province, particularly in rural areas, were deeply marked by war. Given the current scenario of development of the country and considering the possibility of integrate systems and traditional building materials, that respect the environment and fit harmoniously into its natural habitat, one of the alternative options in the actual construction, undergoes resume old solutions and traditional materials such as adobe construction.It is in this context that this project is part of a scientific research in order to permit the improvement and optimization of these traditional solutions, responding to current demands for social, economic and environmental sustainability. The adobe is a building element with potential degradation by water. Due to the climate, subtropical, hot and humid, and geomorphology of the province, about 1000 to 2000 meters of altitude and an extensive river system, these buildings can be vulnerable and present early degradation, exacerbated by lack of knowledge of the properties of geomaterials used and techniques that allow their stabilization and conservation. This paper aims to study the influence of mineralogy and geochemistry of soils used in the production of adobes applied in the construction of habitations, mainly, because from this knowledge, we can develop alternatives to the resolution of recorded pathologies and to improve the strength and durability of those adobes. For this purpose, soil samples were collected, in which mineralogical and geochemical tests were performed. Simultaneously, durability and erodibility tests were done by the method of Geelong in the selected adobes. The results obtained from this research will identify, select and characterize the materials and methods used in construction in raw earth, contributing to the development of knowledge of these sustainable buildings solutions with a strong presence in the Huambo region. From the analysis of the data obtained will be defined a strategy for the next steps of the scientific research project in course designated "Earth Construction in Angola. Characterization, applications and potentialities.". This project aims to encourage the use of the geomaterials in ecological construction and contribute, however modestly, in building solutions with better performance characteristics, comfort, safety, durability and sustainability.
Structural and robustness properties of smart-city transportation networks
NASA Astrophysics Data System (ADS)
Zhang, Zhen-Gang; Ding, Zhuo; Fan, Jing-Fang; Meng, Jun; Ding, Yi-Min; Ye, Fang-Fu; Chen, Xiao-Song
2015-09-01
The concept of smart city gives an excellent resolution to construct and develop modern cities, and also demands infrastructure construction. How to build a safe, stable, and highly efficient public transportation system becomes an important topic in the process of city construction. In this work, we study the structural and robustness properties of transportation networks and their sub-networks. We introduce a complementary network model to study the relevance and complementarity between bus network and subway network. Our numerical results show that the mutual supplement of networks can improve the network robustness. This conclusion provides a theoretical basis for the construction of public traffic networks, and it also supports reasonable operation of managing smart cities. Project supported by the Major Projects of the China National Social Science Fund (Grant No. 11 & ZD154).
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-08-01
In this pilot project, the Building America Partnership for Improved Residential Construction and Florida Power and Light are collaborating to retrofit a large number of homes using a phased approach to both simple and deep retrofits. This project will provide the information necessary to significantly reduce energy use through larger community-scale projects in collaboration with utilities, program administrators and other market leader stakeholders.
Vulnerability assessment at a national level in Georgia
NASA Astrophysics Data System (ADS)
Tsereteli, N.; Arabidze, V.; Varazanashvili, O.; Gugeshashvili, T.
2012-04-01
Vulnerability assessment at a national level in Georgia Nino Tsereteli, Vakhtang Arabidze, Otar Varazanashvili, Tengiz Gugeshashvili The risk always exists when cities are built on. Population growth in cities and urbanization in natural hazard-prone zones leads to infrastructure expansion. The goal of the society is to construct natural hazards resistant infrastructure and minimize the expected losses. This is a complicated task as there is always knowledge deficiency on real seismic hazard and vulnerability. Assessment of vulnerability is vital in risk analysis, as vulnerability is defined in many different ways. Work presented here mostly deals with assessment of infrastructure's and population vulnerability at national level in Georgia. This work was initiated by NATO SFP project "seismic Hazard and Risk Assessment for Southern Caucasus - Eastern Turkey Energy Corridors" and the two work packages WP4 (seismic risk) and WP5 (city scenarios) of risk module of EMME (Earthquake Model of the Middle East Region) project. First step was creation databases (inventory) of elements at risk in GIS. Element at risk were the buildings, population, pipelines. The inventories was studied and Created in GIS for the following categories: Building material, number of stories, number of entrances, condition of building, building period. For pipelines pipe tipe (continous or segmented), material, pipe diameter. Very important is to estimate the initial cost of building for assessment of economic losses. From this purpose the attempt was done and the algorithm of this estimation were prepared taking into account obtained the inventory. Build quality, reliability and durability are of special importance to corresponding state agencies and include different aesthetic, engineering, practical, social, technological and economical aspects. The necessity that all of these aspects satisfy existing normative requirements becomes evident as the building and structures come into exploitation. The long term usage of building is very complex. It relates to the reliability and durability of buildings. The long term usage and durability of a building is determined by the concept of depreciation. Depreciation of an entire building is calculated by summing the products of individual construction unit' depreciation rates and the corresponding value of these units within the building. This method of calculation is based on an assumption that depreciation is proportional to the building's (constructions) useful life. We used this methodology to create a matrix, which provides a way to evaluate the depreciation rates of buildings with different type and construction period and to determine their corresponding value. Finely some attempt was done to investigate how these structures were damaged by various hazards. In other words vulnerability curves were constrained on the basis on the relation between various hazard intensities and damage data.
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
ERIC Educational Resources Information Center
Brown, Daniel
This study examines the management and outcome of the public-private partnerships (P3s) school construction project used in the Auguston housing development in Abbotsford, British Columbia to build a traditionally-designed elementary school. The study explored the relationship between the project's major players, the fiscal incentives that drove…
ERIC Educational Resources Information Center
Camp, Gloria S.
The Ouachita Parish Public Library (Louisiana) conducted a project that involved recruitment, coalition building, public awareness, training, basic literacy, collection development, tutoring, technology, and English as a Second Language (ESL) programs. The project served a community of over 200,000 people, and targeted the learning disabled,…
Sure, They Can Build It But...Manufacturing Students Need Process Planning Skills
ERIC Educational Resources Information Center
Obi, Samuel C.
2007-01-01
Manufacturing systems students usually complete lab projects for class requirements. However, they often do not have an idea how many resources such as time, tools, and materials they will need to complete a project until they get into constructing it. Yet one of the first tasks of real-world manufacturing personnel when they receive new product…
Possible astronomical references in two megalithic building of ancient Latium
NASA Astrophysics Data System (ADS)
Magli, G.
In the wide area of the ancient Latium Vetus - roughly enclosed within the coast and the Apennines between Rome and Terracina, in Central Italy - there are several examples of town's walls and buildings constructed with the spectacular megalithic technique called polygonal, in which enormous blocks are cut in irregular shapes and perfectly fit together without mortar. In many cases, for instance in Alatri, Arpino, Circei, Norba and Segni, the megalithic size of the blocks and the ingenuity in construction reach the same magnificence and impression of power and pride which characterize the worldwide famous Mycenaean towns of Tiryns and Mycenae, constructed around the XIII century BC. In Italy however, all polygonal walls are currently attributed to the Romans, and dated to the first centuries of the Roman republic (V-III century BC), although for most of these constructions no reliable stratigraphy is available. In the present work, which is part of an ongoing project aiming at a complete study of these buildings, we investigate the possible astronomical references in the planning of two among the most imposing of them, namely the so called Acropolis of Alatri and Circei.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eugene S. Grecheck
2010-11-30
This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision onmore » building a new nuclear power plant at the North Anna site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-06-28
This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.
Solar heating system for recreation building at Scattergood School
NASA Technical Reports Server (NTRS)
Heins, C. F.
1978-01-01
The solar heating facility and the project involved in its construction are described. As such, it has both detailed drawings of the completed system and a section that discusses the bottlenecks that were encountered along the way.
ERIC Educational Resources Information Center
Schmalz, Georgann
1985-01-01
Building specifications for birdhouses (nesting boxes) are given for 11 species (chickadee, titmouse, nuthatch, Carolina wren, house wren, downy woodpecker, hairy woodpecker, flicker, bluebird, screech owl, and wood duck) including length, width, depth, entrance diameter, and height above the ground. Pointers for construction, materials, and…
ERIC Educational Resources Information Center
Lundt, John C.; Matt, John
2001-01-01
As serving as its own contractor, a small district in western Montana saved money, had better control over the project, and inspired public confidence. Major advantages were cost savings, controlling the pace of construction, and the ability to cope with change orders. (MLF)
Inefficiencies in water project design and operation in the third world: An economic perspective
NASA Astrophysics Data System (ADS)
Howe, Charles W.; Dixon, John A.
1993-07-01
Water projects in less developed countries (LDCs) frequently are poorly operated and maintained. As a result, project benefits and development impacts fall short of plans. The problems begin in the project identification, design, and construction stages: donor and host country biases lead to inappropriate projects, unsustainable technologies, and shoddy construction. Later operation and maintenance are then difficult or impossible. Causal factors include donor desire to build monuments and sell technology, provision of excessive capital to favored sectors or institutions, and an unwillingness to require a reasonable quid pro quo from the host country. Host country factors include excessive administrative centralization, lack of rewards for good operation and maintenance, and widespread corruption in forms that seriously distort allocative efficiency. Until individual actors on both sides can be motivated to pursue the long-run good of the LDC, Third World water projects will continue to have low or negative net payoffs.
Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project
NASA Astrophysics Data System (ADS)
Bizon-Górecka, Jadwiga; Górecki, Jarosław
2017-10-01
The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.
Risk Management in Construction Project: Taking Fairness into Account
NASA Astrophysics Data System (ADS)
Górecki, Jarosław; Bizon-Górecka, Jadwiga
2017-10-01
Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.
Cleaning Up the Joint: Command, Control, and Agency in American War Fighting
2012-01-01
markers of the rise of professionalism . Constabulary duties on the frontier provided no compelling intellectual locus on which to build a theory of war...Docks; Construction , Equipment and Repairs; Provisions and Clothing; Ordnance and Hydrography; and Medicine and Surgery.80 Its professionalism , however...advisors seem to have convinced themselves otherwise, forcible regime change is by definition a nation- building project of the highest order.67 When
Barbosa, Lidiany Silva
2011-01-01
The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
Based on an evaluation of 10 residential new construction programs, primarily sponsored by investor-owned utilities in the United States, we find that many of these programs are in dire straits and are in danger of being discontinued because current inclusion of only direct program effects leads to the conclusion that they are not cost-effective. We believe that the cost-effectiveness of residential new construction programs can be improved by: (1) promoting technologies and advanced building design practices that significantly exceed state and federal standards; (2) reducing program marketing costs and developing more effective marketing strategies; (3) recognizing the role of thesemore » programs in increasing compliance with existing state building codes; and (4) allowing utilities to obtain an ``energy-savings credit`` from utility regulators for program spillover (market transformation) impacts. Utilities can also leverage their resources in seizing these opportunities by forming strong and trusting partnerships with the building community and with local and state government.« less
Minimizing delays in the Jordanian construction industry by adopting BIM technology
NASA Astrophysics Data System (ADS)
Btoush, M.; Harun, A. T.
2017-11-01
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, K.; Gates, C.
This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about ½ of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gates, C.; Neuhauser, K.
This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about 1/2 of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less
Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Timothy L.
2014-09-01
At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.« less
Ultrasonic humidification for telecommunications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Longo, F.
1994-03-01
This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-03-01
This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.
Code of Federal Regulations, 2012 CFR
2012-01-01
... financial analysis prepared by the Agency, based on the financial projections supplied by the applicant and... definition includes Variable Interest Entities as described in Financial Accounting Standards Board... required at the time the application was received by the Agency. Build-out means the construction...
Code of Federal Regulations, 2013 CFR
2013-01-01
... financial analysis prepared by the Agency, based on the financial projections supplied by the applicant and... definition includes Variable Interest Entities as described in Financial Accounting Standards Board... required at the time the application was received by the Agency. Build-out means the construction...