ERIC Educational Resources Information Center
Hanson, Nathan K.
2010-01-01
This study investigated the attitudes of administrators about differences and similarities between middle and high school teachers. The research question that guided the study was, "Do attitudes about what makes an effective educator differ between building administrators at the middle and high school levels?" A formal, sequential, mixed-methods…
Building a Research Administration Infrastructure at the Department Level
ERIC Educational Resources Information Center
Chun, Maria B. J.
2010-01-01
Due to the current economic crisis, research administrators at public universities are grappling with declining state funding and are faced with identifying other potential sources of revenue to support operations. Research administrators at all levels are forced to do more with less. Department level research administrators must be innovative…
75 FR 53640 - Call for Applications for the International Buyer Program Calendar Year 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-01
..., International Trade Administration, U.S. Department of Commerce, Ronald Reagan Building, 1300 Pennsylvania Ave., Ronald Reagan Building, Suite 800M--Mezzanine Level--Atrium North, Washington, DC 20004. Telephone (202... Commerce, 1300 Pennsylvania Ave., Ronald Reagan Building, Suite 800M-- Mezzanine Level--Atrium North...
1. ADMINISTRATIVE OFFICES WITH SHOWROOM AT GROUND LEVEL. VIEW TO ...
1. ADMINISTRATIVE OFFICES WITH SHOWROOM AT GROUND LEVEL. VIEW TO SOUTH-SOUTHEAST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
The Relationship between Leadership Traits and Personal Characteristics of Campus Administrators
ERIC Educational Resources Information Center
Van Deusen, Nathan P.
2013-01-01
Evidence has found a lack of transformational leadership qualities among building level administrators across central Pennsylvania. The purpose of this project study was to identify the leadership styles of principals in central Pennsylvania and ascertain the link between background variables and leadership qualities held by building-level…
Measures of Student Learning: Building Administrator
ERIC Educational Resources Information Center
Rhode Island Department of Education, 2014
2014-01-01
The purpose of this Guidebook is to describe the process and basic requirements for the student learning measures that are used as part of the building administrator evaluation and support process. For aspects of the process that have room for flexibility and school/district-level discretion, the different options have been clearly separated and…
Factors that Influence Pre-Service Administrators' Views of Appropriate School Counselor Duties
ERIC Educational Resources Information Center
Mason, Kimberly L.; Perera-Diltz, Dilani M.
2010-01-01
This study surveyed pre-service administrative internship students (N = 61) at an urban Midwestern state university to explore factors that influence duties assigned to school counselors at the elementary, middle, and high school levels. Results indicated variation in duties assigned by pre-service administrators based on school building level.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffith, B.; Pless, S.; Talbert, B.
2003-07-01
A new/proposed building for the Teterboro Airport was selected as a case study for High Performance Building Initiative research efforts. This report documents research-level energy analysis conducted on the Teterboro Airport building during predesign and design phases of the project.
Environmental Challenges: Radon and Carbon Dioxide in School Buildings.
ERIC Educational Resources Information Center
Krueger, James
1991-01-01
Many school buildings with high radon levels also exhibit high carbon dioxide levels that starve the minds of students for oxygen. Administrators must realize that the world's best educator cannot teach minds made dysfunctional by their environment. This article describes Environmental Protection Agency testing results and offers radon monitoring…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-03-01
This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.
76 FR 54428 - Call for Applications for the International Buyer Program Calendar Year 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
..., International Trade Administration, U.S. Department of Commerce, Ronald Reagan Building, 1300 Pennsylvania Ave... Commerce, 1300 Pennsylvania Ave., Ronald Reagan Building, Suite 800M-- Mezzanine Level--Atrium North...
14 CFR 150.13 - Incorporations by reference.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 150.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Level Meters,” dated 1973. (d) Availability for purchase. Published material incorporated by reference... Chief Counsel, Rules Docket, AGC-200, Federal Aviation Administration Headquarters Building, 800...
14 CFR 150.13 - Incorporations by reference.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 150.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Level Meters,” dated 1973. (d) Availability for purchase. Published material incorporated by reference... Chief Counsel, Rules Docket, AGC-200, Federal Aviation Administration Headquarters Building, 800...
14 CFR 150.13 - Incorporations by reference.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 150.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... Level Meters,” dated 1973. (d) Availability for purchase. Published material incorporated by reference... Chief Counsel, Rules Docket, AGC-200, Federal Aviation Administration Headquarters Building, 800...
ERIC Educational Resources Information Center
McClure, Kevin R.
2016-01-01
Although researchers have explored dimensions of academic capitalism among students and faculty members, knowledge of the roles of administrators at all levels is underdeveloped in the literature. This institutional case study of a public research-extensive university examines the roles of executive and managerial administrators in bringing a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-03-31
This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.
Knowledge for Intelligence: Discussing the State and the Role of Building Data in Italy
NASA Astrophysics Data System (ADS)
Pasquinelli, A.; Guzzetti, F.
2016-09-01
The availability of integrated information on buildings is the premise for an effective assets management and the provision of innovative services to buildings users: such form of knowledge relies on the efficient exploitation of existing data, providing a complete overview on the state of buildings, and on the acquisition of real-time data flows, coming from sensor and mobile devices, reporting users behaviours. If, on the one hand, technology is progressively enabling the management of new huge streams of data, on the other hand the interconnection among traditional and well rooted datasets, the majority of which in charge of public administrations, is not always guaranteed. While, at European level, interoperability issues among public archives concerning buildings were properly addressed, and the relevance of geo-information is widely recognized, in Italy this process is still taking time to be undertaken. This paper discuss the current state of Building Information in Italy, outlining a possible path for the creation of a georeferenced Building Information System at municipal level, starting from the informative heritage available in existing databases, generated with different purposes and maintained by independent authorities: the idea is to solicit that digitalization process, started a decade ago with the "Digital Administration Code", through the proposition of real use cases that might be implemented once that public data on buildings are profitably combined together.
NASA Astrophysics Data System (ADS)
Buhmirov, V. V.; Prorokova, M. V.
2015-01-01
The method of determining a microclimate comfort level have been developed, taking into account the main parameters influencing the microclimate in residential, public and administration buildings, their mutual influence on the comfort level, and air quality.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-03-31
This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.
School Counselor Perceptions of Administrative Supervision Practices
ERIC Educational Resources Information Center
Eddings, Geoffrey Creighton
2012-01-01
This study examined the perceptions of school counselors regarding administrative supervision practices in K-12 public schools in South Carolina. Specifically, the goal was to gain insight into how school counselors view current building-level supervision practices in relation to Pajak's Twelve Dimensions of Supervisory Practice, as well as how…
Supervision of Instruction in Vocational Education: Who's Minding the Store?
ERIC Educational Resources Information Center
Gray, Kenneth C.
1990-01-01
Despite the importance of improving instruction through the supervision of teachers, building-level vocational school administrators may be ill-prepared for this role and avoid it. Those who are responsible for providing education for vocational school administrators have done little to address strategies for ensuring teacher effectiveness.…
Supporting Experienced and Beginning Teachers of Students with Disabilities.
ERIC Educational Resources Information Center
Billingsley, Bonnie S.; And Others
Administrative support is critical to the professional success and self-esteem of special education teachers. This chapter provides practical strategies for administrators at both the building and central office level to use to support special education teachers. J. S. House's framework is used for considering the different types of administrative…
School Transportation Issues, Laws and Concerns: Implications for Future Administrators
ERIC Educational Resources Information Center
Durick, Jody M.
2010-01-01
Nearly all building administrators are confronted with a variety of transportation issues. Challenges, concerns and questions can arise from various aspects, including student misbehaviors, transportation laws and its implications at the school level, to importance and implementation of a school bus safety program. As new and upcoming future…
Grant Writing Skill Building: A Business Administration Curriculum Proposal
ERIC Educational Resources Information Center
Blankenship, Dianna; Jones, Irma; Lovett, Marvin
2010-01-01
This paper reviews the need for grant writing skills within various types of organizations and the resulting proposal for including grant writing within business administration curriculum at the undergraduate and/or graduate levels. An introduction precedes the results of a survey regarding current grant writing courses within AACSB schools of…
A Descriptive Analysis of the Principalship in New Jersey: 1996-2011
ERIC Educational Resources Information Center
Gristina, Matthew
2014-01-01
Understanding how the behaviors and actions of building principals impact student achievement is a major goal of educational leadership, in which both direct and indirect factors exist. There is a wealth of research which focuses on the importance of school leadership and demonstrates that building level administrators are second only to classroom…
Credit BG. View looks north northwest (325°) towards Administration Building ...
Credit BG. View looks north northwest (325°) towards Administration Building across aircraft apron east of Building 4505. Building 4507 (Storage Building) appears at extreme right of view - Edwards Air Force Base, North Base, Administration Building, Northeast of A Street, Boron, Kern County, CA
Credit BG. Northwest and southwest facades of Administration Building for ...
Credit BG. Northwest and southwest facades of Administration Building for Building 4505 area. Construction began on this building in 1967 - Edwards Air Force Base, North Base, Administration Building, Northeast of A Street, Boron, Kern County, CA
Student Grading Policies: Legal Issues and Administrative Review
ERIC Educational Resources Information Center
Gregory, Richard A.
2005-01-01
This case study focuses on the legal aspects of school district grading policies. Given parental and student challenges to assigned grades, a school district and its employees must be prepared to respond appropriately to substantive and procedural claims. Moreover, when these claims cannot be resolved at the building level, administrative reviews,…
ERIC Educational Resources Information Center
San Antonio, Diosdado M.; Gamage, David T.
2007-01-01
This paper examines the impact of implementing Participatory School Administration, Leadership and Management (PSALM) on the levels of trust among the educational stakeholders in Philippine public secondary schools. After an introductory section, the research context is provided by briefly reviewing relevant literature on PSALM and on trust and by…
ERIC Educational Resources Information Center
Byungura, Jean Claude; Hansson, Henrik; Masengesho, Kamuzinzi; Karunaratne, Thashmee
2016-01-01
With the development of technology in the 21st Century, education systems attempt to integrate technology-based tools to improve experiences in pedagogy and administration. It is becoming increasingly prominent to build human and ICT infrastructure capacities at universities from policy to implementation level. Using a critical discourse analysis,…
Building Public Support for School Leaders
ERIC Educational Resources Information Center
Schultz, Bob
2013-01-01
Almost three-fourths of the American public has lost confidence in the nation's schools, but the recent passage of the Proposition 30 shows that the majority of voters in California hold on to their hope for their schools. School administrators need to build on that vote of confidence, starting at the local level, so they can help the public…
8. PHOTOCOPY, HEATING DRAWING FOR ADMINISTRATION BUILDING. NIKE Missile ...
8. PHOTOCOPY, HEATING DRAWING FOR ADMINISTRATION BUILDING. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
1. ADMINISTRATION BUILDING, RIGHT SIDE, LOOKING SOUTH. NIKE Missile ...
1. ADMINISTRATION BUILDING, RIGHT SIDE, LOOKING SOUTH. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
7. PHOTOCOPY, ELEVATION DRAWING OF ADMINISTRATION BUILDING. NIKE Missile ...
7. PHOTOCOPY, ELEVATION DRAWING OF ADMINISTRATION BUILDING. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
2. ADMINISTRATION BUILDING, REAR SIDE, LOOKING EAST. NIKE Missile ...
2. ADMINISTRATION BUILDING, REAR SIDE, LOOKING EAST. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
3. ADMINISTRATION BUILDING, LEFT SIDE, LOOKING NORTH. NIKE Missile ...
3. ADMINISTRATION BUILDING, LEFT SIDE, LOOKING NORTH. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-06-30
Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.
9. PHOTOCOPY, FOUNDATION AND FLOORING PLANS FOR ADMINISTRATION BUILDING. ...
9. PHOTOCOPY, FOUNDATION AND FLOORING PLANS FOR ADMINISTRATION BUILDING. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
5. ADMINISTRATION BUILDING, RIGHT AND LEFT SIDES, LOOKING NORTHEAST. ...
5. ADMINISTRATION BUILDING, RIGHT AND LEFT SIDES, LOOKING NORTHEAST. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
6. ADMINISTRATION BUILDING WITH FLAG POLE, LOOKING SOUTH. NIKE ...
6. ADMINISTRATION BUILDING WITH FLAG POLE, LOOKING SOUTH. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
4. ADMINISTRATION BUILDING, FRONT AND RIGHT SIDES, LOOKING SOUTHWEST. ...
4. ADMINISTRATION BUILDING, FRONT AND RIGHT SIDES, LOOKING SOUTHWEST. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
Indoor Air Quality Assessment of the San Francisco Federal Building
DOE Office of Scientific and Technical Information (OSTI.GOV)
Apte, Michael; Bennett, Deborah H.; Faulkner, David
2008-07-01
An assessment of the indoor air quality (IAQ) of the San Francisco Federal Building (SFFB) was conducted on May 12 and 14, 2009 at the request of the General Services Administration (GSA). The purpose of the assessment was for a general screening of IAQ parameters typically indicative of well functioning building systems. One naturally ventilated space and one mechanically ventilated space were studied. In both zones, the levels of indoor air contaminants, including CO2, CO, particulate matter, volatile organic compounds, and aldehydes, were low, relative to reference exposure levels and air quality standards for comparable office buildings. We found slightlymore » elevated levels of volatile organic compounds (VOCs) including two compounds often found in"green" cleaning products. In addition, we found two industrial solvents at levels higher than typically seen in office buildings, but the levels were not sufficient to be of a health concern. The ventilation rates in the two study spaces were high by any standard. Ventilation rates in the building should be further investigated and adjusted to be in line with the building design. Based on our measurements, we conclude that the IAQ is satisfactory in the zone we tested, but IAQ may need to be re-checked after the ventilation rates have been lowered.« less
University building safety index measurement using risk and implementation matrix
NASA Astrophysics Data System (ADS)
Rahman, A.; Arumsari, F.; Maryani, A.
2018-04-01
Many high rise building constructed in several universities in Indonesia. The high-rise building management must provide the safety planning and proper safety equipment in each part of the building. Unfortunately, most of the university in Indonesia have not been applying safety policy yet and less awareness on treating safety facilities. Several fire accidents in university showed that some significant risk should be managed by the building management. This research developed a framework for measuring the high rise building safety index in university The framework is not only assessed the risk magnitude but also designed modular building safety checklist for measuring the safety implementation level. The safety checklist has been developed for 8 types of the university rooms, i.e.: office, classroom, 4 type of laboratories, canteen, and library. University building safety index determined using risk-implementation matrix by measuring the risk magnitude and assessing the safety implementation level. Building Safety Index measurement has been applied in 4 high rise buildings in ITS Campus. The building assessment showed that the rectorate building in secure condition and chemical department building in beware condition. While the library and administration center building was in less secure condition.
Using Data Wisely at the System Level
ERIC Educational Resources Information Center
Lockwood, Meghan; Dillman, Mary; Boudett, Kathryn Parker
2017-01-01
District administrators who want to build capacity for data use in schools may be well-served by starting in the central office. This case study of the Boston Public Schools shows how central office administrators can leverage their own data inquiry cycles to improve the ways they support schools in using data. Using the Data Wise Improvement…
ERIC Educational Resources Information Center
Knudson, Joel
2014-01-01
California's Local Control Funding Formula (LCFF) has introduced changes that alter the conditions under which educators, administrators, and community leaders approach their roles in the K-12 education system. Consequently, leaders at all levels may need to build the capacity--both the knowledge and skills and the resources--that they need to…
ERIC Educational Resources Information Center
Moran, Kelly; Larwin, Karen H.
2017-01-01
The purpose of this study is to identify the characteristics and traits of individuals and buildings in which teacher empowerment is strongest, so that those schools and individuals can be further studied and emulated. An additional purpose of the study is to investigate the relationships between principals and school environment characteristics,…
2. PRINTING AND ADVERTISING BUILDING, ADMINISTRATION BUILDING, MERCHANDISE BUILDING, AND ...
2. PRINTING AND ADVERTISING BUILDING, ADMINISTRATION BUILDING, MERCHANDISE BUILDING, AND GARDEN, VIEW TO SOUTHWEST - Sears Roebuck & Company Mail Order Plant, Bounded by Lexington & Grenshaw Streets, Kedzie Avenue & Independence Boulevard, Chicago, Cook County, IL
1. ADMINISTRATION BUILDING ELEVATION TAKEN OFF THE COMPOUND, ACROSS ...
1. ADMINISTRATION BUILDING ELEVATION - TAKEN OFF THE COMPOUND, ACROSS THE STREET, THROUGH THE PERIMETER FENCE - Middlesex Sampling Plant, Administration Building, 239 Mountain Avenue, Middlesex, Middlesex County, NJ
4. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING WEST FACADE. VIEW ...
4. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING WEST FACADE. VIEW TO NORTHEAST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
5. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING PRINCIPAL, EAST, ENTRY. ...
5. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING PRINCIPAL, EAST, ENTRY. VIEW TO WEST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
8. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING VESTIBULE. ...
8. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING VESTIBULE. VIEW TO WEST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
2. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING EAST AND NORTH ...
2. DETAIL VIEW OF ADMINISTRATION BUILDING SHOWING EAST AND NORTH FACADES. VIEW TO SOUTHWEST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
2010-06-28
This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.
ERIC Educational Resources Information Center
Scott, Paul; Moye, Mike
Developed to assist the building-level administrator in implementing a curriculum management system, this handbook considers two of five duties the vocational administrator must perform to meet the obligations of curriculum management: (1) performing curriculum management functions for the vocational program and (2) implementing and conducting an…
10. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING SECOND ...
10. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING SECOND FLOOR CORRIDOR. VIEW TO NORTH. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
9. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING FIRST ...
9. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING FIRST FLOOR CORRIDOR. VIEW TO SOUTH. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
ERIC Educational Resources Information Center
Young, I. Phillip; De La Torre, Guadalupe Xavier
2006-01-01
Research addressing the attraction and selection of individuals for administrator positions is encapsulated in a structural model that depicts different phases of the employee procurement process. Within the present study, attention is devoted to the prescreening stage of the selection process, and screening decisions of superintendents are…
Maras, Melissa A; Weston, Karen J; Blacksmith, Jennifer; Brophy, Chelsey
2015-03-01
Schools must possess a variety of capacities to effectively support comprehensive and coordinated school health promotion activities, and researchers have developed a district-level capacity-building framework specific to school health promotion. State-level school health coalitions often support such capacity-building efforts and should embed this work within a data-based, decision-making model. However, there is a lack of guidance for state school health coalitions on how they should collect and use data. This article uses a district-level capacity-building framework to interpret findings from a statewide coordinated school health needs/resource assessment in order to examine statewide capacity for school health promotion. Participants included school personnel (N = 643) from one state. Descriptive statistics were calculated for survey items, with further examination of subgroup differences among school administrators and nurses. Results were then interpreted via a post hoc application of a district-level capacity-building framework. Findings across districts revealed statewide strengths and gaps with regard to leadership and management capacities, internal and external supports, and an indicator of global capacity. Findings support the utility of using a common framework across local and state levels to align efforts and embed capacity-building activities within a data-driven, continuous improvement model. © 2014 Society for Public Health Education.
Turnaround, Transformational, or Transactional Leadership: An Ethical Dilemma in School Reform
ERIC Educational Resources Information Center
Mette, Ian M.; Scribner, Jay P.
2014-01-01
This case was written for school leaders, specifically building-level principals and central office administrators attempting to implement school turnaround reform efforts. Often, leaders who embark on this type of organizational change work in intense environments that produce high levels of pressure to demonstrate improvement in student…
Building Bridges: How to Increase the Efficacy of Teacher Mentors and Student-Teacher Programs
ERIC Educational Resources Information Center
Nesheim, Nicole E.; Moran, Clarice M.; Pendleton, Melissa
2014-01-01
The cases presented describe two levels of struggle. One level identifies two student teachers (ST) and their mentors failing to meet one another's expectations. Another level presents school administration as it seeks to find ways of meeting STs' needs while maintaining a positive and productive school climate. Relevant research is presented to…
7. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING VESTIBULE ...
7. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW SHOWING VESTIBULE AND COPY ROOM. VIEW TO EAST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
11. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW ON SECOND ...
11. DETAIL VIEW OF ADMINISTRATION BUILDING. INTERIOR VIEW ON SECOND FLOOR SHOWING TYPICAL OFFICE. VIEW TO NORTHWEST. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
Photographic copy of architectural plan for Administration Building (T50): Taylor ...
Photographic copy of architectural plan for Administration Building (T-50): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Building Type OB-H-T, Plans and - Details, Sheet No. 38 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
6. West side of Building 1001 (administration building), looking southeast ...
6. West side of Building 1001 (administration building), looking southeast - Naval Air Station Chase Field, Building 1001, Independence Street, .45 mile south of intersection of Texas State Highway & Independence Street, Beeville, Bee County, TX
4. South side of Building 1001 (administration building), looking north ...
4. South side of Building 1001 (administration building), looking north - Naval Air Station Chase Field, Building 1001, Independence Street, .45 mile south of intersection of Texas State Highway & Independence Street, Beeville, Bee County, TX
3. East side of Building 1001 (administration building), looking west ...
3. East side of Building 1001 (administration building), looking west - Naval Air Station Chase Field, Building 1001, Independence Street, .45 mile south of intersection of Texas State Highway & Independence Street, Beeville, Bee County, TX
5. North side of Building 1001 (administration building), looking southeast ...
5. North side of Building 1001 (administration building), looking southeast - Naval Air Station Chase Field, Building 1001, Independence Street, .45 mile south of intersection of Texas State Highway & Independence Street, Beeville, Bee County, TX
9. Interior of Building 1001 (administration building), Room 204, vault, ...
9. Interior of Building 1001 (administration building), Room 204, vault, looking east - Naval Air Station Chase Field, Building 1001, Independence Street, .45 mile south of intersection of Texas State Highway & Independence Street, Beeville, Bee County, TX
Tribal Green Building Administrative Code Example
This Tribal Green Building Administrative Code Example can be used as a template for technical code selection (i.e., building, electrical, plumbing, etc.) to be adopted as a comprehensive building code.
ERIC Educational Resources Information Center
Hartman, William T., Ed.; Boyd, William Lowe, Ed.
This book analyzes microlevel resource-allocation practices from a variety of levels within the educational system: the school board, district administration, building level, and classroom. Chapters include: "Productive Schools from a Policy Perspective: Desiderata, Designs, and Dilemmas" (W. L. Boyd); "The Politics of Educational Productivity"…
2. Credit PSR. The Administration/Shops Building appears here as the ...
2. Credit PSR. The Administration/Shops Building appears here as the camera looks east (84°). To the right in the view is the Guard House (Building 4279/E-80) which controls entry to the JPL facility. At left is a warehouse (Building 4287/E88). Overhead utility lines supply alternating current to the facility. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA
Photographic copy of foundation plans for Administration Building (T50), Operations ...
Photographic copy of foundation plans for Administration Building (T-50), Operations Building (T-42), and Inflammable Storage Building (T-57): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Bldg Type OB-H-T, Operations Bldg Type OB-A-T, Inflammable Storage Bldg. Type WHSE 1-A (Mod.) Foundation Plans, Sheet No. 35 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
View from southeast to northwest of administration building. Community center ...
View from southeast to northwest of administration building. Community center can be seen in far left background - Stanley R. Mickelsen Safeguard Complex, Administrative Headquarters Building, In Controlled Area just off Avenue A & East of Pump House, Nekoma, Cavalier County, ND
52. NORTHWEST FRONT ELEVATION OF BUILDING 367 (ADMINISTRATION OFFICE BUILDING) ...
52. NORTHWEST FRONT ELEVATION OF BUILDING 367 (ADMINISTRATION OFFICE BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
NASA Astrophysics Data System (ADS)
Prorokova, M. V.; Bukhmirov, V. V.
2016-02-01
The article describes the method of valuation of comfort of microclimate of residen-tial, public and administrative buildings. The method is based on calculation of the coefficient of thermal comfort of a person in the room. Further amendments are introduced to the asym-metry of the thermal radiation, radiation cooling and air quality. The method serves as the basis for a computer program.
Gazda, Nicholas P; Griffin, Emily; Hamrick, Kasey; Baskett, Jordan; Mellon, Meghan M; Eckel, Stephen F; Granko, Robert P
2018-04-01
Purpose: The purpose of this article is to share experiences after the development of a health-system pharmacy administration residency with a MS degree and express the need for additional programs in nonacademic medical center health-system settings. Summary: Experiences with the development and implementation of a health-system pharmacy administration residency at a large community teaching hospital are described. Resident candidates benefit from collaborations with other health-systems through master's degree programs and visibility to leaders at your health-system. Programs benefit from building a pipeline of future pharmacy administrators and by leveraging the skills of residents to contribute to projects and department-wide initiatives. Tools to assist in the implementation of a new pharmacy administration program are also described and include rotation and preceptor development, marketing and recruiting, financial evaluation, and steps to prepare for accreditation. Conclusion: Health-system pharmacy administration residents provide the opportunity to build a pipeline of high-quality leaders, provide high-level project involvement, and produce a positive return on investment (ROI) for health-systems. These programs should be explored in academic and nonacademic-based health-systems.
1943-07-21
Receptionist Mary Louise Gosney enjoys the new Administration Building at the NACA’s Aircraft Engine Research Laboratory. The Administration Building, which was located near the front entrance to the laboratory, opened in December 1942. The staff, which had spent the previous year working in temporary offices inside the hangar, quickly occupied the new building. Lab director Raymond Sharp, the upper management team, and administrative staff had offices in the Administration Building. The structure also contained the lab’s library and auditorium. Gosney was a Chicago native who started at the lab in November 1941. Gosney’s services included welcoming visitors, arranging tours, and arranging interviews with staff members. Gosney’s “Lobby Lines” column in the lab’s newsletter Wing Tips noted the coming and goings of notable visitors and staff members. In addition to her role as receptionist, Gosney also served as the clearance officer. She would later head the entire Administrative Services Division.
ERIC Educational Resources Information Center
Lund, Travis J.; Pilarz, Matthew; Velasco, Jonathan B.; Chakraverty, Devasmita; Rosploch, Kaitlyn; Undersander, Molly; Stains, Marilyne
2015-01-01
Researchers, university administrators, and faculty members are increasingly interested in measuring and describing instructional practices provided in science, technology, engineering, and mathematics (STEM) courses at the college level. Specifically, there is keen interest in comparing instructional practices between courses, monitoring changes…
Rhode Island Model Evaluation & Support System: Building Administrator. Edition III
ERIC Educational Resources Information Center
Rhode Island Department of Education, 2015
2015-01-01
Rhode Island educators believe that implementing a fair, accurate, and meaningful educator evaluation and support system will help improve teaching, learning, and school leadership. The primary purpose of the Rhode Island Model Building Administrator Evaluation and Support System (Rhode Island Model) is to help all building administrators improve.…
13. Photocopy of original construction drawing, dated November 1932 (original ...
13. Photocopy of original construction drawing, dated November 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 32-3 -- ADMINISTRATION BUILDING, BUILDING NO. 32 -- FIRST AND SECOND FLOOR PLANS. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
12. Photocopy of original construction drawing, dated November 1932 (original ...
12. Photocopy of original construction drawing, dated November 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 32-2 -- ADMINISTRATION BUILDING, BUILDING NO. 32 -- BASEMENT PLAN AND CUPOLA DETAIL. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
ERIC Educational Resources Information Center
Raywid, Mary Anne
1997-01-01
Solid research evidence links smaller schools to fewer discipline problems, lower dropout rates, higher student participation levels, and steadier academic progress. Large buildings are no obstacle. Creating small schools requires top administrators to lend impetus and support, facilitate teacher volunteer groups, develop clear policies, adjust…
188. BUILDING 7 (ADMINISTRATION BUILDING), 194041. ALBERT KAHN, INC., ARCHITECTS. ...
188. BUILDING 7 (ADMINISTRATION BUILDING), 1940-41. ALBERT KAHN, INC., ARCHITECTS. GENERAL VIEW FROM EAST SHOWING SOUTH (REAR) ELEVATION AND EAST END WITH STEPPED ENTRANCE CANOPY (AN ADDITION). A PORTION OF BUILDING 8 (HOSPITAL) VISIBLE IN THE BACKGROUND ON RIGHT. - Quonset Point Naval Air Station, Roger Williams Way, North Kingstown, Washington County, RI
Development of Program to Enhance Team Building Leadership Skills of Primary School Administrators
ERIC Educational Resources Information Center
Sairam, Boonchauy; Sirisuthi, Chaiyuth; Wisetrinthong, Kanjana
2017-01-01
Team building leadership skills are important to understandings of how the primary school administrators might work towards creating more effective teamwork in the school. This research aimed 1) to study the components of team building leadership skills needed for primary school administrators, 2) to examine the current states and desirable…
Materials and Process Activities for NASA's Composite Crew Module
NASA Technical Reports Server (NTRS)
Polis, Daniel L.
2012-01-01
In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.
1. Overview of Independence Street, with Building 1001 (administration building) ...
1. Overview of Independence Street, with Building 1001 (administration building) on right, looking south - Naval Air Station Chase Field, Texas State Highway 202, 4.8 miles east of intersection of Texas State Highway 202 & U.S. State Highway 181, Beeville, Bee County, TX
North rear, west part. Administration building is visible at far ...
North rear, west part. Administration building is visible at far right. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
Credit PSR. View looks east southeast (118°) across foundations of ...
Credit PSR. View looks east southeast (118°) across foundations of North Base Administration Building (originally numbered T-50) toward Building 4318 (Warehouse) and Building 4305 (Unicon Portable Hangar). Building 4401 (Hangar No. 1) appears in extreme left background - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
Programming your way out of the past: ISIS and the META Project
NASA Technical Reports Server (NTRS)
Birman, Kenneth P.; Marzullo, Keith
1989-01-01
The ISIS distributed programming system and the META Project are described. The ISIS programming toolkit is an aid to low-level programming that makes it easy to build fault-tolerant distributed applications that exploit replication and concurrent execution. The META Project is reexamining high-level mechanisms such as the filesystem, shell language, and administration tools in distributed systems.
41. Photocopy of photograph (negative made from original photograph on ...
41. Photocopy of photograph (negative made from original photograph on file at Veterans Administration in Wichita, Kansas), photographer unknown, ca. 1933. Aerial view of Veterans Administration Center, view north and east, in the forefront, left to right, are Building 3, Building 1, and Building 2, Buildings 10 through 14 are in background at right - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS
49 CFR 1242.11 - Administration-bridges and buildings (account XX-19-03).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 9 2011-10-01 2011-10-01 false Administration-bridges and buildings (account XX... RAILROADS 1 Operating Expenses-Way and Structures § 1242.11 Administration—bridges and buildings (account XX-19-03). Separate common administration—bridges and buildings expenses between freight and passenger...
49 CFR 1242.11 - Administration-bridges and buildings (account XX-19-03).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 9 2010-10-01 2010-10-01 false Administration-bridges and buildings (account XX... RAILROADS 1 Operating Expenses-Way and Structures § 1242.11 Administration—bridges and buildings (account XX-19-03). Separate common administration—bridges and buildings expenses between freight and passenger...
NASA Astrophysics Data System (ADS)
Xia, He; Chen, Jianguo; Wei, Pengbo; Xia, Chaoyi; de Roeck, G.; Degrande, G.
2009-03-01
In this paper, a field experiment was carried out to study train-induced environmental vibrations. During the field experiment, velocity responses were measured at different locations of a six-story masonry structure near the Beijing-Guangzhou Railway and along a small road adjacent to the building. The results show that the velocity response levels of the environmental ground and the building floors increase with train speed, and attenuate with the distance to the railway track. Heavier freight trains induce greater vibrations than lighter passenger trains. In the multi-story building, the lateral velocity levels increase monotonically with floor elevation, while the vertical ones increase with floor elevation in a fluctuating manner. The indoor floor vibrations are much lower than the outdoor ground vibrations. The lateral vibration of the building along the direction of weak structural stiffness is greater than along the direction with stronger stiffness. A larger room produces greater floor vibrations than the staircase at the same elevation, and the vibration at the center of a room is greater than at its corner. The vibrations of the building were compared with the Federal Transportation Railroad Administration (FTA) criteria for acceptable ground-borne vibrations expressed in terms of rms velocity levels in decibels. The results show that the train-induced building vibrations are serious, and some exceed the allowance given in relevant criterion.
Davis, Charles R; Lynch, Erik J
2018-06-01
There is a significant disparity in roles, responsibilities, education, training, and expertise between the school nurse and building administrator. Because of this disparity, a natural chasm must be bridged to optimize student health, safety, well-being, and achievement in the classroom while meeting the individual needs of both professionals. This article constructs and presents a new school nurse-building administrator relationship model, the foundation of which is formed from the pioneering and seminal work on high-performance professional relationships and outcomes of Lewin and Drucker. The authors posit that this new model provides the framework for successful school nurse-building administrator interactions that will lead to optimal student outcomes.
ERIC Educational Resources Information Center
Marrs-Morford, Linda; Marshall, Ralph L.
2012-01-01
Across the country, education budgets are being slashed while legislatures are passing laws that mandate the inclusion of increasing numbers of educational programs in schools. The reality: schools must do more with less. School administrators, especially building-level principals, must take a serious look at spending in their schools. The…
The Principal's Legal Handbook. Second Edition.
ERIC Educational Resources Information Center
Camp, William E., Ed.; Connelly, Mary Jane, Ed.; Lane, Kenneth E., Ed.; Mead, Julie F., Ed.
This handbook for elementary and secondary school principals contains several chapters on topics important to building level administrators. Each chapter summarizes relevant state and federal court decisions and statutes, concluding with recommendations for practice. The handbook is divided into four sections: students and the law, special…
ERIC Educational Resources Information Center
Peterson, Jimmy L.
The focus of this dissertation was to investigate the relationship between the increase of black political power and the involvement of the federal government to the increase of black educational leadership in the areas of school board members, superintendents, central office administrators, and building level administrators in a kindergarten-12…
ERIC Educational Resources Information Center
Kopper, William D.
1980-01-01
Explores the changes in the administration and enforcement of building regulations that will be engendered by the proposed federal energy building standards. Also evaluates the effectiveness of those standards in meeting congressional intent. Available from U.C. Davis Law Review, School of Law, Martin Luther King Jr. Hall, University of…
47. EAST CORNER OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION ...
47. EAST CORNER OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
South side of administration building, also showing the library in ...
South side of administration building, also showing the library in the left distance, and the life sciences building in the right distance. - San Bernardino Valley College, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pratt, Robert G.; Bauman, Nathan N.; Katipamula, Srinivas
2003-01-17
This report describes results from an evaluation of the Whole Building Diagnostician's (WBD) ability to automatically and continually diagnose operational problems in building air handlers at the Federal Aviation Administration's Denver airport.
1. View looking southwest showing from left to right: Administration/Terminal ...
1. View looking southwest showing from left to right: Administration/Terminal Building and brick hangar. - Manchester Airport, Administration-Terminal Building, East of Pine Island Pond, south of North Perimeter Road, Manchester, Hillsborough County, NH
NASA Astrophysics Data System (ADS)
Haja Bava Mohidin, Hazrina Binti; Ismail, Alice Sabrina
2015-01-01
The objective of this paper is to explicate on the study of modern administrative building in Malaysia which portrays regional design approach that conforms to the local context and climate by reviewing two case studies; Perdana Putra (1999) and former Prime Minister's Office (1967). This paper is significant because the country's stature and political statement was symbolized by administrative building as a national icon. In other words, it is also viewed as a cultural object that is closely tied to a particular social context and nation historical moment. Administrative building, therefore, may exhibit various meanings. This paper uses structuralism paradigm and semiotic principles as a methodological approach. This paper is of importance for practicing architects and society in the future as it offers new knowledge and understanding in identifying the suitable climatic consideration that may reflect regionalist design approach in modern administrative building. These elements then may be adopted in designing public buildings in the future with regional values that are important for expressing national culture to symbolize the identity of place and society as well as responsive to climate change.
Facility Focus: Academic and Administrative Buildings.
ERIC Educational Resources Information Center
College Planning & Management, 1999
1999-01-01
Describes how academic and administrative buildings can be designed to support learning into the next century in the following examples: an applied science an engineering facility; a college greenhouse; and a public affairs classroom building. Photos and floor plans accompany each example. (GR)
Telecommunications administration standard
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gustwiller, K.D.
1996-05-01
The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings,more » reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.« less
The Case of Rivera Elementary School: The Politics of Collaboration
ERIC Educational Resources Information Center
Maxcy, Brendan D.; Nguyen, Thu Suong T.
2013-01-01
This case involves a struggle for control among differently situated leaders--district- and building-level administrators, teachers, parents and community members, and university partners--seeking to influence the reform agenda of a high-poverty urban elementary school serving Latina/Latino students. The various stakeholders encounter a variety of…
Envisioning Effective Laptop Initiatives
ERIC Educational Resources Information Center
Clausen, Jon M.; Britten, Jody; Ring, Gail
2008-01-01
A recent survey of 74 building-level school administrators in Indiana challenged many of the assumptions regarding 1:1 laptop initiatives and how 1:1 access would affect teaching and learning. It also revealed disturbing realities regarding instructional practices of teachers, as well as efforts to improve school technology integration. The intent…
ERIC Educational Resources Information Center
Reeves, Douglas B.
This book offers instructions for school principals, assistant principals, teachers, and district-level administrators for building a comprehensive accountability system that focuses on leadership skills. It presents recommendations for assessing and nurturing teacher performance, setting up balanced assessment and accountability policies, and…
ERIC Educational Resources Information Center
Weber, Eric G.
2009-01-01
Westside Middle School, located in Omaha, Nebraska, serves 950 seventh- and eighth-grade students. Over the last few years, the school's teachers and administrators have evaluated its technology status and needs. As part of this process, the staff members engaged in many activities, including developing a building-level technology plan, organizing…
38 CFR 39.62 - Space criteria for support facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... assignment for the next 10 years. (a) Administrative building. The administrative building should be.../office/equipment/work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The...
38 CFR 39.62 - Space criteria for support facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 10 years. (a) Administrative building. The administrative building should be approximately 1,600 NSF.../work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance...
Looking north along the west front of the administration building, ...
Looking north along the west front of the administration building, toward the east end of the library. The liberal arts building (a non-contributor) is at the left. - San Bernardino Valley College, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
Former Administration Building
2016-10-27
This archival image was released as part of a gallery comparing JPL's past and present, commemorating the 80th anniversary of NASA's Jet Propulsion Laboratory on Oct. 31, 2016. Building 11, one of the oldest buildings on lab, was once JPL's central administration building. It is now the Space Sciences Laboratory. This picture dates back to May 1943. http://photojournal.jpl.nasa.gov/catalog/PIA21201
ERIC Educational Resources Information Center
Townsend, Catherine M.
A state-wide survey was undertaken in 1988-1989 to determine the status of the library media programs in South Carolina's public schools. The first of two phases of the study involved the compilation of statistical data reported to the State Department of Education by building level administrators on the Basic Educational Data System (BEDS) for…
33 CFR 207.440 - St. Marys Falls Canal and Locks, Mich.; use, administration, and navigation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... United States part and other lands, piers, buildings, water level regulation works, hydroelectric power plant, and other appurtenances acquired or constructed for the channel improvement and use of the...) Manning requirements. On all vessels of 400 gross tons or over navigating the canal under their own power...
33 CFR 207.440 - St. Marys Falls Canal and Locks, Mich.; use, administration, and navigation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... United States part and other lands, piers, buildings, water level regulation works, hydroelectric power plant, and other appurtenances acquired or constructed for the channel improvement and use of the...) Manning requirements. On all vessels of 400 gross tons or over navigating the canal under their own power...
Safeguarding Your Technology: Practical Guidelines for Electronic Education Information Security.
ERIC Educational Resources Information Center
Szuba, Tom
This guide was developed specifically for educational administrators at the building, campus, district, system, and state levels, and is meant to serve as a framework to help them better understand why and how to effectively secure their organization's information, software, and computer and networking equipment. This document is organized into 10…
ERIC Educational Resources Information Center
Cohen, Allan
This guidebook provides the principal with some fundamental tools for reducing stress and preventing professional burnout. Chapter 1 offers strategies for identifying and reducing personal stress. Cognitive restructuring is advocated as an effective, permanent approach, in which the individual changes patterns of thinking about stressful…
Evaluation of the 1985-86 Beginning Teacher Program.
ERIC Educational Resources Information Center
Feldman, H. S.
The Florida Beginning Teacher Program was evaluated in 1985-86 to determine its impact on teacher performance and to study problem areas identified in the 1984-85 evaluation. A sample of 43 beginning teachers and their support team members (a peer teacher, a building-level administrator, and one or more professional educators) completed surveys.…
40 CFR 62.10 - Submission to Administrator.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requests, reports, applications, submittals, and other communications to the Administrator pursuant to this... Building, Boston, Mass. 02203. II—New York, New Jersey, Puerto Rico, Virgin Islands Federal Office Building...
Building Magnets at Brookhaven National Laboratory: A Condensed Account
NASA Astrophysics Data System (ADS)
Willen, Erich
2017-09-01
The development of superconducting wire and cable in the late twentieth century enabled high-field magnets and thus much higher beam-collision energies in accelerators. These higher collision energies have allowed experimentalists to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are the realm their experiments seek to investigate. The subject has aroused the curiosity of the public as well as scientists and has facilitated the support needed to build and operate such expensive machines and experiments. The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, facing both success and failure along the way. It is also a story of administrative imperatives that had unpredictable effects on a project's success, depending mostly on the people in the administrative roles and the decisions that they made.
Development of a cultural heritage object BIM model
NASA Astrophysics Data System (ADS)
Braila, Natalya; Vakhrusheva, Svetlana; Martynenko, Elena; Kisel, Tatyana
2017-10-01
The BIM technology during her creation has been aimed, first of all, at design and construction branch, but its application in the field of studying and operation of architectural heritage can essentially change and transfer this kind of activity to new qualitative level. The question of effective introduction of BIM technologies at the solution of administrative questions of operation and development of monuments of architecture is considered in article. Creation of the information model of the building object of cultural heritage including a full complex of information on an object is offered: historical and archival, legal, technical, administrative, etc. The 3D model of an object of cultural heritage with color marking of elements on degree of wear and a first priority of carrying out repair will become one of components of model. This model will allow to estimate visually technical condition of the building in general and to gain general idea about scales of necessary repair and construction actions that promotes improvement of quality of operation of an object, and also simplifies and accelerates processing of information and in need of a memorial building assessment as subject to investment.
130. ARAII Administration building (ARA613) vicinity map and plot plan ...
130. ARA-II Administration building (ARA-613) vicinity map and plot plan showing relationship to other existing buildings on site and to ARA-602, to which this building was attached. F.C. Torkelson Comapny 842-area/SL-1-101-U-1. Date: October 1959. Ineel index code no. 070-0101-65-851-150053. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
22. AERIAL VIEW LOOKING EAST DOWN CENTRAL AVENUE FROM WEST ...
22. AERIAL VIEW LOOKING EAST DOWN CENTRAL AVENUE FROM WEST OF THE ADMINISTRATIVE AND SUPPORT AREA OF THE PLANT. ON THE LEFT (NORTH) SIDE OF THE STREET IN THE FOREGROUND OF THE PHOTOGRAPH IS BUILDING 111, THE GENERAL ADMINISTRATION BUILDING. TO THE EAST OF BUILDING 111 IS BUILDING 112, THE CAFETERIA. FURTHER TO THE EAST IS BUILDING 331, THE VEHICLE MAINTENANCE GARAGE AND FIRE DEPARTMENT; BUILDING 333, THE PAINT SHOP; BUILDING 334, THE ELECTRICAL AND GENERAL MAINTENANCE SHOP; AND BUILDING 551, THE GENERAL WAREHOUSE. ON THE RIGHT (SOUTH) SIDE OF CENTRAL AVENUE, IN THE FOREGROUND IS BUILDING 121, FIREARMS REPAIR. BEHIND BUILDING 121 IS BUILDING 122, EMERGENCY MEDICAL SERVICES, AND BUILDING 123, HEALTH PHYSICS LABORATORY. BUILDING 441, THE PRODUCTION ... - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO
76 FR 13700 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-14
... day charters on Chesapeake Bay and tributaries and Delaware Bay for team building exercises, hands-on... represented by the Maritime Administration (MARAD), is authorized to grant waivers of the U.S.-build... Clerk, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12...
Energy Efficiency Program Administrators and Building Energy Codes
Explore how energy efficiency program administrators have helped advance building energy codes at federal, state, and local levels—using technical, institutional, financial, and other resources—and discusses potential next steps.
Fitzsimons General Hospital, Women's Army Corps Recreation & Administration Building, ...
Fitzsimons General Hospital, Women's Army Corps Recreation & Administration Building, North Hickey Street, west side, 75 feet north of intersection of West Pennington Avenue & North Hickey Street, Aurora, Adams County, CO
Aspects of the Health Inspection Authority in the People's Republic of China.
Ma, Sha; Chen, Gang; Tan, B-K
2015-05-20
In China, there was a pressing need to establish a governmental agency to oversee the organizations that provide public health and medical services. The Chinese Health Inspection Authority (HIA), a relatively independent organization functioning at each administrative level (provincial, municipal, and county), was mandated to conduct 11 health inspection functions to maintain efficient public health and medical services. These functions include issuing health permit, conducting health supervision and inspection, health testing and evaluation, case investigation, complaint handling, managing public health crisis, monitoring and safeguarding public health at major public events, enforcing supervision and inspection compliance, public health education, information management, and team training and management. Since the reform of the health inspection system by the Ministry of Health in 2000, the HIA underwent a series of changes and transitions. This study aimed to describe and assess the five factors that were considered to be important for meeting service delivery objectives of the HIA in the People's Republic of China. A total of 604 HIAs, sampled across three geographical regions of China at three administrative levels, participated in a cross-sectional survey conducted in 2013. Descriptive statistics were used to analyze the status of mandated operations, manpower, revenue and expenditures, and institutional infrastructure. Differences in these characteristics across the geographical regions and administrative levels were compared. On average, the HIAs had not fully implemented the 11 mandated functions at any administrative levels. Governmental financial allocations were the main sources of revenue. Three primary personnel employment models coexisted and most employed the quasi-civil service employment model. The institutional infrastructure did not meet governmental mandated standards with respect to building area or the number and types of equipment available to conduct key functions. In 2012, the majority of the HIAs in China at the provincial, municipal, and county levels did not meet the mandated requirements, although positive indications toward meeting these requirements were observed. It is necessary for the government to pay more attention to institutional resources (buildings, equipment, and the level of the staff's educational attainment) and ensure that the HIAs can meet their service delivery objectives.
Exposure to airborne asbestos in buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, R.J.; Van Orden, D.R.; Corn, M.
The concentration of airborne asbestos in buildings and its implication for the health of building occupants is a major public health issue. A total of 2892 air samples from 315 public, commercial, residential, school, and university buildings has been analyzed by transmission electron microscopy. The buildings that were surveyed were the subject of litigation related to suits alleging the general building occupants were exposed to a potential health hazard as a result of exposure to the presence of asbestos containing materials (ACM). The average concentration of all asbestos structures was 0.02 structures/ml (s/ml) and the average concentration of asbestos greatermore » than or equal to 5 microns long was 0.00013 fibers/ml (f/ml). The concentration of asbestos was higher in schools than in other buildings. In 48% of indoor samples and 75% of outdoor samples, no asbestos fibers were detected. The observed airborne concentration in 74% of the indoor samples and 96% of the outdoor samples is below the Asbestos Hazard Emergency Response Act clearance level of 0.01 s/ml. Finally, using those fibers which could be seen optically, all indoor samples and all outdoor samples are below the Occupational Safety and Health Administration permissible exposure level of 0.1 f/ml for fibers greater than or equal to 5 microns in length. These results provide substantive verification of the findings of the U.S. Environmental Protection Agency public building study which found very low ambient concentrations of asbestos fibers in buildings with ACM, irrespective of the condition of the material in the buildings.« less
Experiential, Collaborative and Team Projects: Communication Audits in the MBA Communication Course
ERIC Educational Resources Information Center
Hart, Claudia; Vroman, Margo; Stulz, Karin
2015-01-01
In this paper the authors discuss the challenges and rewards of building a graduate level Managerial Communication course around an experiential communication audit project. The purpose of the project was to provide MBA (Master of Business Administration) students with exposure to the real world responsibilities and demands of working in a complex…
What Do We Know and What Do We Want to Know about Related Services Personnel?
ERIC Educational Resources Information Center
Rapport, Mary Jane K.; Williamson, Pamela
2004-01-01
District and building-level administrators are often responsible for the hiring and supervising of related services personnel. Thus, a deeper understanding of the personnel issues that exist in the related services disciplines becomes important. What we know about the supply and demand, professional preparation, and certification and licensure of…
Overall view of administration area with building 11110 in background, ...
Overall view of administration area with building 11110 in background, looking east from facility gate. - Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Pilot Plant Road, China Lake, Kern County, CA
ADM. Aerial view of administration area. Camera facing westerly. From ...
ADM. Aerial view of administration area. Camera facing westerly. From left to right in foregound: Substation (TAN-605), Warehouse (TAN-628), Gate House (TAN-601), Administration Building (TAN-602). Left to right middle ground: Service Building (TAN-603), Warehouse (later known as Maintenance Shop or Craft Shop, TAN-604), Water Well Pump Houses, Fuel Tanks and Fuel Pump Houses, and Water Storage Tanks. Change House (TAN-606) on near side of berm. Large building beyond berm is A&M. Building, TAN-607. Railroad tracks beyond lead from (unseen) turntable to the IET. Date: June 6, 1955. INEEL negative no. 13201 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Building Energy Asset Score for Utilities and Energy Efficiency Program Administrators
DOE Office of Scientific and Technical Information (OSTI.GOV)
Building Technologies Office
2015-01-01
The Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifies opportunities for users to invest in energy efficiency upgrades. It is web-based and free to use. This fact sheet discusses the value of the score for utilities and energy efficiency program administrators.
Buffing, burnishing, and stripping of vinyl asbestos floor tile
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hollett, B.A.; Edwards, A.; Clark, P.J.
Studies were conducted to evaluate airborne asbestos concentrations during the three principal types of preventative maintenance (low-speed spray-buffing, ultra high-speed burnishing, and wet-stripping) used on asbestos-containing floor tiles. These were done under pre-existing and prepared levels of floor care maintenance. Airborne asbestos concentrations were measured before and during each floor care procedure to determine the magnitude of the increase in airborne asbestos levels during each procedure. Airborne total fiber concentrations were also measured for comparison with the Occupational Safety and Health Administration`s (OSHA) Permissible Exposure Limit (PEL) of 0.1 f/cm{sup 3}. Low-speed spray-buffing and wet-stripping were evaluated on pre-existing floormore » conditions and three levels of prepared floor care conditions (poor, medium, and good). Ultra high-speed burnishing and wet-stripping were evaluated on two levels of prepared floor care conditions (poor and good). Floor care conditions were defined in consultation with the Chemical Specialty Manufacturers Association and other representatives of floor-care chemical manufacturers. Controlled studies were conducted in an unoccupied building at the decommissioned Chanute Air Force Base in Rantoul, Illinois, with the cooperation of the U.S. Air Force. The building offered approximately 8600 ft{sup 2} of open floor space tiled with 9-inch by 9-inch resilient floor tile containing approximately 5% chrysotile asbestos.« less
Building an exceptional imaging management team: from theory to practice.
Hogan, Laurie
2010-01-01
Building a strong, cohesive, and talented managerial team is a critical endeavor for imaging administrators, as the job will be enhanced if supported by a group of high-performing, well-developed managers. For the purposes of this article, leadership and management are discussed as two separate, yet equally important, components of an imaging administrator's role. The difference between the two is defined as: leadership relates to people, management relates to process. There are abundant leadership and management theories that can help imaging administrators develop managers and ultimately build a better team. Administrators who apply these theories in practical and meaningful ways will improve their teams' leadership and management aptitude. Imaging administrators will find it rewarding to coach and develop managers and witness transformations that result from improved leadership and management abilities.
ERIC Educational Resources Information Center
Macpherson, Reynold; Sun Hyung, Park
2015-01-01
This philosophy paper proposes that a primary purpose of Educational Administration, as a field of study, research and practice in South Korea, becomes national capacity building. It does this by evaluating the current scope of Educational Administration against the need for a new national education policy to help South Korea make the transition…
2010-01-07
CAPE CANAVERAL, Fla. - The 525-foot-tall Vehicle Assembly Building, in the background, is witness to the formation of the Propellants North Administrative and Maintenance Facility, a new "green" building under construction in Launch Complex 39 at NASA's Kennedy Space Center in Florida. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
20 CFR 672.510 - What cost limits apply to the use of YouthBuild program funds?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What cost limits apply to the use of YouthBuild program funds? 672.510 Section 672.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... Limitations § 672.510 What cost limits apply to the use of YouthBuild program funds? (a) Administrative costs...
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton.
This manual is intended for use by the Alberta, Canada, school boards, administrators, consultants, education staff, and other individuals involved in school building projects. The purpose of the School Capital Plan, funding, and Alberta Education's funding framework are detailed. The school building project components of the School Capital Plan…
EAST FRONT AND NORTH SIDE OF ADMINISTRATION BUILDING. VIEW TO ...
EAST FRONT AND NORTH SIDE OF ADMINISTRATION BUILDING. VIEW TO SOUTH - Rock Island National Cemetery, Rock Island Arsenal, 0.25 mile north of southern tip of Rock Island, Rock Island, Rock Island County, IL
EAST FRONT AND SOUTH SIDE OF ADMINISTRATION BUILDING. VIEW TO ...
EAST FRONT AND SOUTH SIDE OF ADMINISTRATION BUILDING. VIEW TO NORTH. - Rock Island National Cemetery, Rock Island Arsenal, 0.25 mile north of southern tip of Rock Island, Rock Island, Rock Island County, IL
43. Photocopy of photograph (Pentran file), photographer and date unknown ...
43. Photocopy of photograph (Pentran file), photographer and date unknown (circa 1960). VIEW WEST, EAST SIDE ADMINISTRATION BUILDING - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA
View of the southwest guard tower, cell blocks seven and ...
View of the southwest guard tower, cell blocks seven and eight, administration building west tower, and Fairmount Avenue, looking from the administration building facing west - Eastern State Penitentiary, 2125 Fairmount Avenue, Philadelphia, Philadelphia County, PA
Environmental practices for biomedical research facilities.
Medlin, E L; Grupenhoff, J T
2000-01-01
As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360
El Sioufi, M
1996-03-01
In order to make the Sustainable Ismailia Project institutionally sustainable, the National Project Manager identified the need to build the capacity of local leadership. The Training Section, in UNCHS, proposed a capacity-building program designed to respond to this demand focusing on the skill-training and attitude formation needed for effective local leadership. The proposed program is adapted from the "Training for Elected Leadership" series widely tested and used in many regions. It combines direct training for local officials from villages in Ismailia, and indirect training for trainers from the Ministry of Local Administration (MLA). After the course, the MLA trainers would design a training program which they will implement nationally. The Minister for Local Administration decided to finance the translation and production of the manuals, while the Governor of Ismailia offered to cover the trainees' expenses. The UNCHS Training and Capacity-Building Section would provide technical guidance and coordinate and implement the program. Once the Arabic version of the training materials would be available, UNCHS would use it regionally to reach out to other Arab States. This example illustrates how concerned stakeholders cooperate to address capacity-building needs. The UNCHS Training Section assumes the role of facilitator and acts as a catalyst for the formulation of such activities. The feeling of ownership of the locally produced/adapted training materials enhances the propensity of their effective and extensive use. This approach has succeeded across regions, cultures, and languages with out-reaching multiplier effects. full text
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the first wall of the Propellants North Administrative and Maintenance Facility is lifted into place. In the background is the 525-foot-tall Vehicle Assembly Building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
VIEW OF CHAPEL/ADMINISTRATION BUILDING, WITH CONSTITUTION AVENUE AND BIVOUAC OF ...
VIEW OF CHAPEL/ADMINISTRATION BUILDING, WITH CONSTITUTION AVENUE AND BIVOUAC OF THE DEAD PLAQUES IN FOREGROUND. VIEW TO NORTH. - Los Angeles National Cemetery, 950 South Sepulveda Boulevard, Los Angeles, Los Angeles County, CA
How Metric Conversion Affects Administrative Practices
ERIC Educational Resources Information Center
Straka, M. K.
1977-01-01
Changes necessary in the administrative activities of educational institutions following conversion to the metric system are outlined for secretarial practices, purchasing, internal reporting and forms, computer operations, travel, publications, buildings and plant, new buildings, sport facilities, and health services. (MF)
ENTRANCE ROAD FROM MAIN ENTRANCE GATE, WITH ADMINISTRATION BUILDING AT ...
ENTRANCE ROAD FROM MAIN ENTRANCE GATE, WITH ADMINISTRATION BUILDING AT LEFT, LOWER BARN AT CENTER AND UPPER BARN AT RIGHT BACKGROUND. VIEW TO SOUTH. - Marion National Cemetery, 1700 East Thirty-eighth Street, Marion, Grant County, IN
9. View looking south showing additional housing and administrative buildings. ...
9. View looking south showing additional housing and administrative buildings. Taken from same side of the street as the view above. - Fort Benjamin Harrison, East Fifty-sixth Street (Aultman Avenue) & Glenn Road, Lawrence, Marion County, IN
A&M. Plot plan of administration and A&M areas. Shows relationships ...
A&M. Plot plan of administration and A&M areas. Shows relationships among administration buildings and to A&M building (TAN-607), railroad turntable. Ralph M. Parsons 902-2&3-ANP-U 3. Date: December 1952. INEEL index code no. 032-0100-00-693-106690 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
16. ARAII Administration building ARA613. South (front) and east sides. ...
16. ARA-II Administration building ARA-613. South (front) and east sides. Camera facing northwest. Sign at left corner of building says, "Fuels and materials division, materials joining research and development laboratory." Part of south wall already has been demolished. Sign on roof railing says, "Danger--Abestos." Ineel photo no. 2-3. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Mette, Ian M.; Bengtson, Ed
2015-01-01
This case was written to help prepare building-level and central office administrators who are expected to effectively lead schools and systems in an often tumultuous world of educational accountability and reform. The intent of this case study is to allow educators to examine the impact data management has on the types of thinking required when…
Principles of Good Principals: Effective Leadership Brings a Board's Vision to the School Level
ERIC Educational Resources Information Center
Martineau, Pamela
2012-01-01
The importance of effective principals to school reform is well-documented. But what makes a school principal an effective change agent, and how can a school board and district administrators assist in pushing their top site leaders to excellence? Many district and board leaders say it's all about vision, building trust with staff, and developing…
But What if I Can't Do It? The Role of Efficacy in Principalship
ERIC Educational Resources Information Center
Powell, Michael Lanier
2013-01-01
As the 21st century progresses, the role of the building-level school administrator has become more and more complex. With the demands of the No Child Left Behind Act, changing demographics, instructional leadership, and state accountability systems, the need for principals to feel a sense of efficacy toward their jobs is critical. There is a body…
An analysis of the concept of organizational commitment.
Liou, Shwu-Ru
2008-01-01
Building organizational commitment. This paper aims to analyze the concept of organizational commitment, including its attributes, antecedents, outcomes, and measurements. CINAHL, MEDLINE, Psychology and Behavioral Sciences Collection, Sociological Collection, and PubMed. By understanding the concept of organizational commitment, administrators and nurses can become more aware of their levels of commitment, bridge gaps in communication, and eventually provide higher-quality care to clients.
ERIC Educational Resources Information Center
Biddle, Catharine
2017-01-01
Schools that build and support high levels of trust between stakeholder groups have been shown to support greater collaboration amongst those groups, including parents, teachers, administrators, and students (Tschannen-Moran, 2001). When stakeholders in schools feel the sense of psychological safety that accompanies trust, they are more willing or…
ERIC Educational Resources Information Center
Babo, Gerard; Ramaswami, Soundaram
2016-01-01
In 1996 the Council of Chief State School Officers proposed and adopted via the Interstate School Leaders Licensure Consortium (ISLLC), six overarching leadership standards for both building and district level administrators, which were then revised in 2008 (CCSSO, 2008). These standards have influenced the licensing and certification process in a…
ERIC Educational Resources Information Center
Morret, Tanya H.; Machado, Crystal H.
2017-01-01
Given the wide range of ability (academic, linguistic and cultural) in classrooms differentiated instruction is often difficult to manage. District and building level leadership can play an important role by providing the vision and support needed to implement Whole School Cluster Grouping (WSCG), the innovative scheduling approach described in…
41. Photocopy of photograph (Pentran file), photographer and date unknown. ...
41. Photocopy of photograph (Pentran file), photographer and date unknown. Shows trolley with Trolley Barn and Administration Building in background. VIEW NORTHEAST - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA
Historical development of administration architecture in Malaysia (15th-21st century)
NASA Astrophysics Data System (ADS)
Mohidin, H. H. B.; Ismail, A. S.
2014-02-01
The main purpose of this paper is to document the development of the state administration building in Malaysia before and after the independence era, in relation to the evolutionary period of Malaysia's political, social and economic history. Multiple case study approach [19] is applied by referring to six prominent case studies to represent state administrative buildings from various phases of Malaysian history beginning from 14th century to 21st century as exemplar. Since this paper formulates new ways to approach and describes state administrative building design and factors that influence them, it uses interpretivism paradigm and (semiotics) as methodological approach to study the relationship between the building design and contextual elements. This paper, therefore, offers new insights, which not only add to knowledge in this field by widening and strengthening the understanding of state administrative architecture in Malaysia, but also are valuable for range of associated fields including architectural semiotics and non verbal communication. This is because this paper reveals deep understandings of the built form and material environment operating as a sign in a cultural and social context.
NASA Astrophysics Data System (ADS)
Pathak, Maharshi
City administrators and real-estate developers have been setting up rather aggressive energy efficiency targets. This, in turn, has led the building science research groups across the globe to focus on urban scale building performance studies and level of abstraction associated with the simulations of the same. The increasing maturity of the stakeholders towards energy efficiency and creating comfortable working environment has led researchers to develop methodologies and tools for addressing the policy driven interventions whether it's urban level energy systems, buildings' operational optimization or retrofit guidelines. Typically, these large-scale simulations are carried out by grouping buildings based on their design similarities i.e. standardization of the buildings. Such an approach does not necessarily lead to potential working inputs which can make decision-making effective. To address this, a novel approach is proposed in the present study. The principle objective of this study is to propose, to define and evaluate the methodology to utilize machine learning algorithms in defining representative building archetypes for the Stock-level Building Energy Modeling (SBEM) which are based on operational parameter database. The study uses "Phoenix- climate" based CBECS-2012 survey microdata for analysis and validation. Using the database, parameter correlations are studied to understand the relation between input parameters and the energy performance. Contrary to precedence, the study establishes that the energy performance is better explained by the non-linear models. The non-linear behavior is explained by advanced learning algorithms. Based on these algorithms, the buildings at study are grouped into meaningful clusters. The cluster "mediod" (statistically the centroid, meaning building that can be represented as the centroid of the cluster) are established statistically to identify the level of abstraction that is acceptable for the whole building energy simulations and post that the retrofit decision-making. Further, the methodology is validated by conducting Monte-Carlo simulations on 13 key input simulation parameters. The sensitivity analysis of these 13 parameters is utilized to identify the optimum retrofits. From the sample analysis, the envelope parameters are found to be more sensitive towards the EUI of the building and thus retrofit packages should also be directed to maximize the energy usage reduction.
49 CFR 41.110 - New DOT owned buildings and additions to buildings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false New DOT owned buildings and additions to buildings....110 New DOT owned buildings and additions to buildings. (a) DOT Operating Administrations responsible for the design and construction of new DOT Federally owned buildings will ensure that each building is...
Contextual view of building, with building #12 in right background ...
Contextual view of building, with building #12 in right background and building #11 in right foreground. Camera facing east-southeast - Naval Supply Center, Broadway Complex, Administration Storehouse, 911 West Broadway, San Diego, San Diego County, CA
Overview of Commercial Buildings, 2003
2008-01-01
The Energy Information Administration conducts the Commercial Buildings Energy Consumption Survey (CBECS) to collect information on energy-related building characteristics and types and amounts of energy consumed in commercial buildings in the United States.
Contextual view of building, with building #11 in right foreground. ...
Contextual view of building, with building #11 in right foreground. Camera facing east - Naval Supply Center, Broadway Complex, Administration Storehouse, 911 West Broadway, San Diego, San Diego County, CA
9. Historic American Buildings Survey E. W. Russell, Photographer, February ...
9. Historic American Buildings Survey E. W. Russell, Photographer, February 28, 1935 MAIN BUILDING (ADMINISTRATION) WEST - Spring Hill College, Main Building, Old Shell Road, Spring Hill, Mobile County, AL
School Consolidation Survey: Iredell County: Mooresville, Statesville, North Carolina.
ERIC Educational Resources Information Center
Engelhardt and Engelhardt, Inc., Purdy Station, NY.
This document explores the feasibility of consolidating three North Carolina school districts into a single administrative unit. Factors analyzed include future population and enrollment growth, existing buildings and school building needs, program offerings, staff qualifications, administrative organization, and financial considerations of…
42. Photocopy of photograph (Pentran file), photographer and date unknown ...
42. Photocopy of photograph (Pentran file), photographer and date unknown (circa 1950). Shows Trolley Barn in background and Administration Building on right. VIEW SOUTH - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA
NASA Technical Reports Server (NTRS)
1996-01-01
Building 1100 is the NASA administrative building. Services located in this building include two banks, a post office, barber shop, cafeteria, snack bar, travel agency, dry cleaners, the NASA Exchange retail store and medical facilities for employees.
2016-10-27
This archival image was released as part of a gallery comparing JPL's past and present, commemorating the 80th anniversary of NASA's Jet Propulsion Laboratory on Oct. 31, 2016. The Administration Building of NASA's Jet Propulsion Laboratory (Building 180) is pictured in January 1965. What appears as a parking lot in this photograph later becomes "The Mall", a landscaped open-air gathering place. A small security control post can be seen at the left of the 1965 image. And Building 167, one of the lab's cafeterias, is on the right. http://photojournal.jpl.nasa.gov/catalog/PIA21121
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Federal High-Performance Green Buildings; Federal Buildings Personnel Training Act; Notification of... High- Performance Green Buildings, Office of Governmentwide Policy, General Services Administration... download from the Office of Federal High-Performance Green Building Web site Library at-- http://www.gsa...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-17
... Federal High-Performance Green Buildings; the Green Building Advisory Committee; Notification of Upcoming... teleconference meetings of the Green Building Advisory Committee (the Committee). The teleconference meetings are... Federal High Performance Green Buildings, Office of Governmentwide Policy, General Services Administration...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
F. Habashi
2000-06-22
The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from mostmore » of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR Site Layout, Safeguards and Security System, Site Radiological Monitoring System, Site Electrical Power System, Site Compressed Air System, and Waste Treatment Building Ventilation System.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... Federal High-Performance Green Buildings; Green Building Advisory Committee; Notification of Upcoming... and agenda for the November 27, 2012, meeting of the Green Building Advisory Committee Meeting (the... Green Buildings, Office of Government-wide Policy, General Services Administration, 1275 First Street NE...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
... Federal High-Performance Green Buildings; Green Building Advisory Committee; Notification of Upcoming... and agenda for the May 1, 2013, meeting of the Green Building Advisory Committee Meeting (the... Green Buildings, Office of Government-wide Policy, General Services Administration, 1275 First Street NE...
75 FR 52671 - YouthBuild Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... required by green building and weatherization industries but are not yet standardized. A full list of the...Build Program AGENCY: Employment and Training Administration, Labor. ACTION: Notice of proposed...Build Transfer Act of 2006 (Transfer Act), which establishes the YouthBuild program in the Department...
14 CFR 151.93 - Buildings; utilities; sidewalks; parking areas; and landscaping.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Buildings; utilities; sidewalks; parking areas; and landscaping. 151.93 Section 151.93 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Commerce Weather Bureau if available, or other evidence satisfactory to the Administrator. (b) Airport...
14 CFR 151.93 - Buildings; utilities; sidewalks; parking areas; and landscaping.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Buildings; utilities; sidewalks; parking areas; and landscaping. 151.93 Section 151.93 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Commerce Weather Bureau if available, or other evidence satisfactory to the Administrator. (b) Airport...
14 CFR 151.93 - Buildings; utilities; sidewalks; parking areas; and landscaping.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Buildings; utilities; sidewalks; parking areas; and landscaping. 151.93 Section 151.93 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Commerce Weather Bureau if available, or other evidence satisfactory to the Administrator. (b) Airport...
ERIC Educational Resources Information Center
Davis, Jerry L., Ed.; Nelson, Cathy S., Ed.; Gauger, Elizabeth S., Ed.
This book presents useful information on types and levels of aggression, how conflicts escalate, early warning signs of violence, and characteristics of a safe school. Violence prevention techniques, many based on principles that form the foundation of the Boys Town Education Model, show educators and administrators how to calm an angry or…
ERIC Educational Resources Information Center
Kahn, Josh; Nese, Joseph T.; Alonzo, Julie
2016-01-01
There is strong theoretical support for oral reading fluency (ORF) as an essential building block of reading proficiency. The current and standard ORF assessment procedure requires that students read aloud a grade-level passage (˜ 250 words) in a one-to-one administration, with the number of words read correctly in 60 seconds constituting their…
ERIC Educational Resources Information Center
Oregon Univ., Eugene. Center for Advanced Technology in Education.
Presented in this program and proceedings are the following 27 papers describing a variety of educational uses of computers: "Learner Based Tools for Special Populations" (Barbara Allen); "Micros and Mainframes: Practical Administrative Applications at the Building Level" (Jeannine Bertrand and Eric Schiff); "Logo and Logowriter in the Curriculum"…
Growing Clinical and Academic Nursing Leaders: Building the Pipeline.
Sessler Branden, Pennie; Sharts-Hopko, Nancy C
Nursing faces a crisis because there exists a dearth of qualified nurse academicians and administrators willing to step up to high-level leadership positions such as deanships and chief nursing operators. This article critically appraises the available literature regarding succession planning in the nursing profession and offers pragmatic suggestions to the profession to engage in succession planning in a deliberate and thoughtful manner.
Structural Element Testing in Support of the Design of the NASA Composite Crew Module
NASA Technical Reports Server (NTRS)
Kellas, Sotiris; Jackson, Wade C.; Thesken, John C.; Schleicher, Eric; Wagner, Perry; Kirsch, Michael T.
2012-01-01
In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). For the design and manufacturing of the CCM, the team adopted the building block approach where design and manufacturing risks were mitigated through manufacturing trials and structural testing at various levels of complexity. Following NASA's Structural Design Verification Requirements, a further objective was the verification of design analysis methods and the provision of design data for critical structural features. Test articles increasing in complexity from basic material characterization coupons through structural feature elements and large structural components, to full-scale structures were evaluated. This paper discusses only four elements tests three of which include joints and one that includes a tapering honeycomb core detail. For each test series included are specimen details, instrumentation, test results, a brief analysis description, test analysis correlation and conclusions.
The spatial equity principle in the administrative division of the Central European countries
Klapka, Pavel; Bačík, Vladimír; Klobučník, Michal
2017-01-01
The paper generally builds on the concept of justice in social science. It attempts to interpret this concept in a geographical and particularly in a spatial context. The paper uses the concept of accessibility to define the principle of spatial equity. The main objective of the paper is to propose an approach with which to assess the level of spatial equity in the administrative division of a territory. In order to fulfil this objective the paper theoretically discusses the concept of spatial equity and relates it to other relevant concepts, such as spatial efficiency. The paper proposes some measures of spatial equity and uses the territory of four Central European countries (Austria, the Czech Republic, Hungary, Slovakia) as example of the application of the proposed measures and the corroboration of the proposed approach. The analysis is based on the administrative division of four countries and is carried out at different hierarchical levels as defined by the Nomenclature of Units for Territorial Statistics (NUTS). PMID:29091953
7 CFR 4274.337 - Other regulatory requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... with the seismic provisions of one of the following model building codes or the latest edition of that...) Uniform Building Code; (ii) 1993 Building Officials and Code Administrators International, Inc. (BOCA) National Building Code; or (iii) 1992 Amendments to the Southern Building Code Congress International...
7 CFR 4274.337 - Other regulatory requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... with the seismic provisions of one of the following model building codes or the latest edition of that...) Uniform Building Code; (ii) 1993 Building Officials and Code Administrators International, Inc. (BOCA) National Building Code; or (iii) 1992 Amendments to the Southern Building Code Congress International...
41 CFR 128-1.8005 - Seismic safety standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the model building codes that the Interagency Committee on Seismic Safety in Construction (ICSSC...) Uniform Building Code (UBC); (2) The 1992 Supplement to the Building Officials and Code Administrators International (BOCA) National Building Code (NBC); and (3) The 1992 Amendments to the Southern Building Code...
7 CFR 4274.337 - Other regulatory requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... with the seismic provisions of one of the following model building codes or the latest edition of that...) Uniform Building Code; (ii) 1993 Building Officials and Code Administrators International, Inc. (BOCA) National Building Code; or (iii) 1992 Amendments to the Southern Building Code Congress International...
41 CFR 128-1.8005 - Seismic safety standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the model building codes that the Interagency Committee on Seismic Safety in Construction (ICSSC...) Uniform Building Code (UBC); (2) The 1992 Supplement to the Building Officials and Code Administrators International (BOCA) National Building Code (NBC); and (3) The 1992 Amendments to the Southern Building Code...
41 CFR 128-1.8005 - Seismic safety standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the model building codes that the Interagency Committee on Seismic Safety in Construction (ICSSC...) Uniform Building Code (UBC); (2) The 1992 Supplement to the Building Officials and Code Administrators International (BOCA) National Building Code (NBC); and (3) The 1992 Amendments to the Southern Building Code...
41 CFR 128-1.8005 - Seismic safety standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the model building codes that the Interagency Committee on Seismic Safety in Construction (ICSSC...) Uniform Building Code (UBC); (2) The 1992 Supplement to the Building Officials and Code Administrators International (BOCA) National Building Code (NBC); and (3) The 1992 Amendments to the Southern Building Code...
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, construction workers survey the last outside wall of the Propellants North Administrative and Maintenance Facility. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, concrete layers on either side of the high-density foam insulation of the Propellants North Administrative and Maintenance Facility's walls will prevent any transfer of radiant heat between the exterior and interior of the building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, high-density foam insulation between the concrete layers of the Propellants North Administrative and Maintenance Facility's walls will prevent any transfer of radiant heat between the exterior and interior of the building. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... education, occupational skills training, and employment services to disadvantaged youth in their communities... DEPARTMENT OF LABOR Employment and Training Administration Notice of Availability of Funds and Solicitation for Grant Applications for YouthBuild Grants AGENCY: Employment and Training Administration, Labor...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Administrator qualifications and procedures for HUD building products certification programs. 200.935 Section 200.935 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-14
... Wetland Reserve Program (WRP), to allow the Federal Highway Administration (FHWA) in cooperation with the... available upon request from the Natural Resources Conservation Service, Suite 1321, Federal Building, 100... WRP Coordinator, Natural Resources Conservation Service, Suite 1321, Federal Building, 100 West...
3. Photograph of an historic photograph in the possession of ...
3. Photograph of an historic photograph in the possession of the Engineer's Office of the Marion, Illinois Veterans Administration Medical Center. DINING HALL BUILDING #2, LOOKING NE; DATED JANUARY 31, 1942. - Veterans Administration Medical Center, Building No. 2, Old State Route 13 West, Marion, Williamson County, IL
16. Photograph of an historic photograph in the possession of ...
16. Photograph of an historic photograph in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. HOSPITAL BUILDING #1, LOOKING NE; DATED NOVEMBER 30, 1941. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
Tour Your Schools with This Energy Checklist in Hand.
ERIC Educational Resources Information Center
Barnett, Mark R.
1991-01-01
Provides a checklist for administrators to use while looking for signs of wasted energy and examining lighting, building construction, heating and ventilation systems, and plumbing and refrigeration. After completing the checklist for a single building or every school in the district, administrators should prioritize physical changes needed for…
51. CONTEXT VIEW LOOKING NORTHWEST OF BUILDING 365 (ARMAMENT TESTING ...
51. CONTEXT VIEW LOOKING NORTHWEST OF BUILDING 365 (ARMAMENT TESTING BUILDING) IN BASE SPARES AREA WITH BUILDING 367 (ADMINISTRATIVE OFFICE BUILDING) IN MIDDLE GROUND AND BUILDING 368 (WAREHOUSE) IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
46 CFR 386.3 - Preservation of property.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MISCELLANEOUS REGULATIONS GOVERNING PUBLIC BUILDINGS... property; throwing articles from an Academy building; and climbing on statues, fountains or any part of a building. ...
Application GIS on university planning: building a spatial database aided spatial decision
NASA Astrophysics Data System (ADS)
Miao, Lei; Wu, Xiaofang; Wang, Kun; Nong, Yu
2007-06-01
With the development of university and its size enlarging, kinds of resource need to effective management urgently. Spacial database is the right tool to assist administrator's spatial decision. And it's ready for digital campus with integrating existing OMS. It's researched about the campus planning in detail firstly. Following instanced by south china agriculture university it is practiced that how to build the geographic database of the campus building and house for university administrator's spatial decision.
Technology Prioritization: Transforming the U.S. Building Stock to Embrace Energy Efficiency
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abdelaziz, Omar; Farese, Philip; Abramson, Alexis
2013-01-01
The U.S. Buildings sector is responsible for about 40% of the national energy expenditures. This is due in part to wasteful use of resources and limited considerations made for energy efficiency during the design and retrofit phases. Recent studies have indicated the potential for up to 30-50% energy savings in the U.S. buildings sector using currently available technologies. This paper discusses efforts to accelerate the transformation in the U.S. building energy efficiency sector using a new technology prioritization framework. The underlying analysis examines building energy use micro segments using the Energy Information Administration Annual Energy Outlook and other publically availablemore » information. The tool includes a stock-and-flow model to track stock vintage and efficiency levels with time. The tool can be used to investigate energy efficiency measures under a variety of scenarios and has a built-in energy accounting framework to prevent double counting of energy savings within any given portfolio. This tool is developed to inform decision making and estimate long term potential energy savings for different market adoption scenarios.« less
2. Overview of Buildings 2015, 2133 and 2009, with Building ...
2. Overview of Buildings 2015, 2133 and 2009, with Building 1001 (administration building) in background, looking northeast - Naval Air Station Chase Field, Texas State Highway 202, 4.8 miles east of intersection of Texas State Highway 202 & U.S. State Highway 181, Beeville, Bee County, TX
15. INTERIOR, DETAIL OF SKYLIGHT AT ROOF PEAK, ORIGINAL BUILDING ...
15. INTERIOR, DETAIL OF SKYLIGHT AT ROOF PEAK, ORIGINAL BUILDING - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA
INTERIOR OF BUILDING, LOOKING TOWARD FRONT. VIEW TO SOUTHEAST. ...
INTERIOR OF BUILDING, LOOKING TOWARD FRONT. VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
INTERIOR OF BUILDING, LOOKING TOWARD REAR. VIEW TO NORTH ...
INTERIOR OF BUILDING, LOOKING TOWARD REAR. VIEW TO NORTH - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
FLORIDA LARGE BUILDING STUDY - POLK COUNTY ADMINISTRATION BUILDING
The report describes an extensive characterization and parameter assessment study of a single, large building in Bartow, FL, with the purpose of assessing the impact on radon entry of design, construction, and operating features of the building, particularly the mechanical subsys...
ERIC Educational Resources Information Center
Draheim, Jim
2001-01-01
Explains the ingredients of a signature building and the things that school and university administrators must do in order to create one. Discusses the need to plan for signature buildings with a long- range outlook. Explains the importance of these buildings as reference points. (GR)
17. Historic American Buildings Survey E. W. Russell, Photographer, May ...
17. Historic American Buildings Survey E. W. Russell, Photographer, May 7, 1936 GENERAL VIEW OF PORTICO (OR ARCADE) LOOKING WEST, 1st FLOOR OF ADMINISTRATION BUILDING - Spring Hill College, Main Building, Old Shell Road, Spring Hill, Mobile County, AL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moss, C.E.; Ragab, M.
1995-09-01
In response to a request from the County Tax Administrator, an investigation was begun into exposure to electric and magnetic fields at the Cape May County Board of Taxation (SIC-7389), Cape May Court House, New Jersey. Employees there suspected they were receiving high exposure to extremely low frequency (ELF) electric and magnetic fields. Measurements were taken with particular attention given to the areas around four large switchboards which were located directly behind the wall of the the tax office. At the outside corners of the building and in the parking lot outside, the magnetic field levels ranged from 0.1 tomore » 10.7 milligauss (mG). At similar locations, electric field levels ranged from 1.9 to 6.9 volts/meter (V/m). Inside the building, magnetic and electric field levels ranged from 0.1 to 900mG and 1.4 to 5.7V/m, respectively.« less
ADM. Administration Building (TAN602). Early room layout, door and room ...
ADM. Administration Building (TAN-602). Early room layout, door and room schedules. Ralph M. Parsons 902-2-ANP-602-A 31. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 033-0602-00-693-106710 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
132. ARAII Administration building (ARA613) elevations of north, south, east, ...
132. ARA-II Administration building (ARA-613) elevations of north, south, east, and west sides. F. C. Torkelson Company 842-area/SL-1-613-A-2. Date: October 1959. Ineel index no. 070-0613-00-851-150054. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
15. Photograph of an historic photograph in the possession of ...
15. Photograph of an historic photograph in the possession of the Engineer's Office of the Marion, IL Veterans Administration Medical Center. HOSPITAL BUILDING #1; E & N (FRONT) ELEVATIONS, LOOKING SW; DATED MAY 18, 1942. - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...
A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
15. Photocopy of scaled drawing (from the Engineering Office of ...
15. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) drawn by A.B. Metcalf, issued February 5, 1935). Tree planting plan of R-VAH site, showing Building #6 in relation to its surroundings. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
26 CFR 301.7701-13 - Pre-1970 domestic building and loan association.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 26 Internal Revenue 18 2012-04-01 2012-04-01 false Pre-1970 domestic building and loan association... (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Definitions § 301.7701-13 Pre-1970... association under Federal or State law which meets supervisory test (described in paragraph (b) of this...
26 CFR 301.7701-13 - Pre-1970 domestic building and loan association.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 26 Internal Revenue 18 2014-04-01 2014-04-01 false Pre-1970 domestic building and loan association... (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Definitions § 301.7701-13 Pre-1970... association under Federal or State law which meets supervisory test (described in paragraph (b) of this...
26 CFR 301.7701-13 - Pre-1970 domestic building and loan association.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Pre-1970 domestic building and loan association... (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Definitions § 301.7701-13 Pre-1970... association under Federal or State law which meets supervisory test (described in paragraph (b) of this...
26 CFR 301.7701-13 - Pre-1970 domestic building and loan association.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Pre-1970 domestic building and loan association... (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Definitions § 301.7701-13 Pre-1970... association under Federal or State law which meets supervisory test (described in paragraph (b) of this...
2009-12-11
CAPE CANAVERAL, Fla. - Concrete covers the insulation in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the walls for the Propellants North Administrative and Maintenance Facility get a layer of high-density foam insulation. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, one of the walls of the Propellants North Administrative and Maintenance Facility is lowered into the trench which will support it. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - Construction of the walls for the Propellants North Administrative and Maintenance Facility begins in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, workers guide one of the walls of the Propellants North Administrative and Maintenance Facility into place. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the final shape of the Propellants North Administrative and Maintenance Facility becomes apparent as its walls are erected. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a team of construction workers ensures that the walls of the Propellants North Administrative and Maintenance Facility are installed properly. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a crane is enlisted to lift the walls of the Propellants North Administrative and Maintenance Facility into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the Propellants North Administrative and Maintenance Facility begins to take shape as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the Propellants North Administrative and Maintenance Facility begins to take shape as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - Insulation is placed in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, one of the walls of the Propellants North Administrative and Maintenance Facility glides through the air into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a row of walls is erected as the Propellants North Administrative and Maintenance Facility takes shape. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, reminiscent of a barn-raising, the Propellants North Administrative and Maintenance Facility springs into being in a single day as its walls are lifted into position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, steady progress is made by a team of construction workers to erect the walls of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2009-12-11
CAPE CANAVERAL, Fla. - Concrete is poured over the insulation in the walls for the Propellants North Administrative and Maintenance Facility in Launch Complex 39 at NASA's Kennedy Space Center in Florida. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, workers lift one of the walls of the Propellants North Administrative and Maintenance Facility into an upright position. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, man and machine work side by side to position the walls of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-07
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, a worker is seen through an opening left for a doorway in a newly erected wall of the Propellants North Administrative and Maintenance Facility. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
Typological diversity of tall buildings and complexes in relation to their functional structure
NASA Astrophysics Data System (ADS)
Generalov, Viktor P.; Generalova, Elena M.; Kalinkina, Nadezhda A.; Zhdanova, Irina V.
2018-03-01
The paper focuses on peculiarities of tall buildings and complexes, their typology and its formation in relation to their functional structure. The research is based on the analysis of tall buildings and complexes and identifies the following main functional elements of their formation: residential, administrative (office), hotel elements. The paper also considers the following services as «disseminated» in the space-planning structure: shops, medicine, entertainment, kids and sports facilities, etc., their location in the structure of the total bulk of the building and their impact on typological diversity. Research results include suggestions to add such concepts as «single-function tall buildings» and «mixed-use tall buildings and complexes» into the classification of tall buildings. In addition, if a single-function building or complex performs serving functions, it is proposed to add such concepts as «a residential tall building (complex) with provision of services», «an administrative (public) tall building (complex) with provision of services» into the classification of tall buildings. For mixed-use buildings and complexes the following terms are suggested: «a mixed-use tall building with provision of services», «a mixed-use tall complex with provision of services».
VIEW OF MASTER CLOCK, SECOND FLOOR, BUILDING 1, FACING NORTH ...
VIEW OF MASTER CLOCK, SECOND FLOOR, BUILDING 1, FACING NORTH - Roosevelt Base, Administration & Brig Building, Bounded by Nevada & Colorado Streets, Reeves & Richardson Avenues, Long Beach, Los Angeles County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiencymore » of the building.« less
4. EAST FACE. VEGETATIVE SCREENS BUFFER THE BUILDING FROM INDUSTRIAL ...
4. EAST FACE. VEGETATIVE SCREENS BUFFER THE BUILDING FROM INDUSTRIAL AREAS TO THE SOUTH OF OARB. - Oakland Army Base, General Purpose Administration Building, Chungking & Algiers Streets, Oakland, Alameda County, CA
EAST (SIDE) AND NORTH (REAR) ELEVATIONS OF BUILDING. VIEW TO ...
EAST (SIDE) AND NORTH (REAR) ELEVATIONS OF BUILDING. VIEW TO SOUTHWEST. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
NORTH (REAR) AND EAST (SIDE) ELEVATIONS OF BUILDING. VIEW TO ...
NORTH (REAR) AND EAST (SIDE) ELEVATIONS OF BUILDING. VIEW TO SOUTH. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
SOUTH (FRONT) AND WEST (SIDE) ELEVATIONS OF BUILDING. VIEW TO ...
SOUTH (FRONT) AND WEST (SIDE) ELEVATIONS OF BUILDING. VIEW TO NORTH. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
3. Context view includes Building 78 (second from left) and ...
3. Context view includes Building 78 (second from left) and Building 59 (partially seen at right edge). Camera is pointed WSW along Farragut Avenue. Buildings on left side of street are, from left: Building 38, Building 78 and Building 431. Crane No. 80 is at Drydock No. 1. Buildings on right side of street are, from right: Building 59 (with porch posts) and Building 856 (two sections). - Puget Sound Naval Shipyard, Administration Building, Farragut Avenue, Bremerton, Kitsap County, WA
78 FR 46546 - Design-Build Contracting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
...-0043] RIN 2125-AF58 Design-Build Contracting AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... alternative technical concepts (ATC) in design-build project delivery of highway construction. The revisions... design-build proposers to submit ATCs in their technical and price proposals. The FHWA seeks comments on...
38 CFR 39.21 - Space criteria for support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... building. The administrative building should be approximately 1,600 NSF in total, providing space, as... room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance/service building may be combined with the...
63. CONTEXT VIEW LOOKING WEST OF BUILDING 372 (HAZARDOUS STORAGE) ...
63. CONTEXT VIEW LOOKING WEST OF BUILDING 372 (HAZARDOUS STORAGE) IN BASE SPARES AREA WITH BUILDING 370 (ADMINISTRATIVE OFFICE BUILDING) IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
78 FR 24309 - Pipeline and Hazardous Materials Safety Administration
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...
ERIC Educational Resources Information Center
Ingalls, Wayne B.
1995-01-01
The way in which the University of Botswana went about building the consensus necessary to develop a new administrative and management structure is described. The process began with a commission review to address increasing demand, and progressed to recommendations, governing council response, a task force for reorganization, and implementation.…
ERIC Educational Resources Information Center
Department of Energy, Washington, DC.
This guide shows ways that school administrators and board members can contribute to energy choice decisions for educational facilities, and it discusses how reducing operating costs also can create better learning environments. The guide reveals how design guidelines help create high-performance school buildings. It explains the use of energy…
13. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...
13. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLOT PLAN AND ROOF PLAN, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-8. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA
12. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...
12. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). PLANTING PLAN AND PLANT LIST, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET L-251. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA
14. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...
14. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS AND ELEVATIONS, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-9. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA
129. ARAII Administrative and technical support building (ARA606) sections showing ...
129. ARA-II Administrative and technical support building (ARA-606) sections showing roof and wall details and longitudinal section. C.A. Sundberg and Associates 866-area/ALPR-606-A-5. Date: May 1958. Ineel index code no. 070-0606-00-822-102828. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
128. ARAII Administrative and technical support building (ARA606) elevations for ...
128. ARA-II Administrative and technical support building (ARA-606) elevations for northwest, southwest, northeast, and southeast sides. C.A. Sundberg and Associates 866-area/ALPR-606-A-3. Date: May 1958. Ineel index code no. 070-0606-00-822-102826. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, with the placement of the last outside wall of the Propellants North Administrative and Maintenance Facility, the "barn-raising" of the new "green" facility is complete. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, this crane raised all of the outside walls of the Propellants North Administrative and Maintenance Facility over a period of two days. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, all of the exterior walls of the Propellants North Administrative and Maintenance Facility have been lifted into place. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, construction of the Propellants North Administrative and Maintenance Facility is moving ahead with the placement of all of the outside walls complete. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
2010-01-08
CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the last outside wall of the Propellants North Administrative and Maintenance Facility is lifted into place. Concrete layers on either side of high-density foam insulation in the facility's walls will prevent any transfer of radiant heat between the exterior and interior of the buildings. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann
4. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 2 ...
4. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 2 & BUILDING 1) FROM THE 'CAMPUS' GROUNDS; LOOKING NE. (Harms) - Veterans Administration Medical Center, Old State Route 13 West, Marion, Williamson County, IL
3. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 2 ...
3. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 2 & BUILDING 1) FROM THE 'CAMPUS' GROUNDS; LOOKING NW. (Harms) - Veterans Administration Medical Center, Old State Route 13 West, Marion, Williamson County, IL
Building No. 1057, Experiment Station Assistants Residence, view of north ...
Building No. 1057, Experiment Station Assistants Residence, view of north elevation - Wind River Administrative Site, Building No. 1057, Chapman Road, near Lookout Mountain Road, Carson, Skamania County, WA
Building No. 1057, Experiment Station Assistants Residence, view of west ...
Building No. 1057, Experiment Station Assistants Residence, view of west elevation - Wind River Administrative Site, Building No. 1057, Chapman Road, near Lookout Mountain Road, Carson, Skamania County, WA
Building No. 1057, Experiment Station Assistants Residence, view of east ...
Building No. 1057, Experiment Station Assistants Residence, view of east elevation - Wind River Administrative Site, Building No. 1057, Chapman Road, near Lookout Mountain Road, Carson, Skamania County, WA
Building No. 1057, Experiment Station Assistants Residence, view of south ...
Building No. 1057, Experiment Station Assistants Residence, view of south elevation - Wind River Administrative Site, Building No. 1057, Chapman Road, near Lookout Mountain Road, Carson, Skamania County, WA
Building No. 1053, Experiment Station Directors Residence, view of south ...
Building No. 1053, Experiment Station Directors Residence, view of south elevation - Wind River Administrative Site, Building No. 1053, Chapman Avenue, near Lookout Mountain Road, Carson, Skamania County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... for OMB Review; Comment Request; YouthBuild Reporting System ACTION: Notice. SUMMARY: The Department... Administration (ETA) sponsored information collection request (ICR) titled, ``YouthBuild Reporting System,'' to... at [email protected] . SUPPLEMENTARY INFORMATION: YouthBuild grantees collect and report...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-09
... Management Regulation; FMR Bulletin PBS-2012-03; Redesignations of Federal Buildings: Correction AGENCY: Public Buildings Service (PBS), General Services Administration (GSA). ACTION: Notice of a bulletin..., 2012, a bulletin announcing the designation and redesignation of three Federal buildings. Inadvertently...
A Basic Manual for Physical Plant Administration.
ERIC Educational Resources Information Center
Weber, George O., Ed.; Fincham, Michael W., Ed.
This book provides practical advice on problems of institutional plant management to physical plant administrators. Areas covered include the role, organization, and facilities of the physical plant department; personnel administration; financial administration; buildings maintenance and operation; custodial services; utilities distribution…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arends, J.; Sandusky, William F.
This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency ofmore » the building.« less
40 CFR 35.2216 - Notice of building completion and final inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Notice of building completion and final... Notice of building completion and final inspection. The grantee shall notify the Regional Administrator when the building of the project is complete. Final inspection shall be made by the Regional...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... and Environmental Design Green Building Rating System of the U.S. Green Building Council. Alternatives... International Falls, MN AGENCY: Public Buildings Service, General Services Administration (GSA). ACTION: Notice...: October 14, 2011. FOR FURTHER INFORMATION CONTACT: Donald R. Melcher, Jr., GSA Public Buildings Service...
Code of Federal Regulations, 2011 CFR
2011-04-01
... apply to design-build projects? 636.116 Section 636.116 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.116 What organizational conflict of interest requirements apply to design-build projects? (a) State...
Code of Federal Regulations, 2014 CFR
2014-04-01
... apply to design-build projects? 636.116 Section 636.116 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.116 What organizational conflict of interest requirements apply to design-build projects? (a) State...
Code of Federal Regulations, 2012 CFR
2012-04-01
... apply to design-build projects? 636.116 Section 636.116 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.116 What organizational conflict of interest requirements apply to design-build projects? (a) State...
Code of Federal Regulations, 2013 CFR
2013-04-01
... apply to design-build projects? 636.116 Section 636.116 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.116 What organizational conflict of interest requirements apply to design-build projects? (a) State...
77 FR 59953 - Changes in Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... areas of Terry L. Baker, Administration team.com/lomrs.htm. Washington County President, Building, 100... Jackson Township http://www.rampp- November 26, 2012.... 421805 (12-03-0843P). O. Moyer, Building, 60 team... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...
24 CFR 200.925c - Model codes.
Code of Federal Regulations, 2012 CFR
2012-04-01
... below. (1) Model Building Codes—(i) The BOCA National Building Code, 1993 Edition, The BOCA National..., Administration, for the Building, Plumbing and Mechanical Codes and the references to fire retardant treated wood... number 2 (Chapter 7) of the Building Code, but including the Appendices of the Code. Available from...
24 CFR 200.925c - Model codes.
Code of Federal Regulations, 2013 CFR
2013-04-01
... below. (1) Model Building Codes—(i) The BOCA National Building Code, 1993 Edition, The BOCA National..., Administration, for the Building, Plumbing and Mechanical Codes and the references to fire retardant treated wood... number 2 (Chapter 7) of the Building Code, but including the Appendices of the Code. Available from...
24 CFR 200.925c - Model codes.
Code of Federal Regulations, 2014 CFR
2014-04-01
... below. (1) Model Building Codes—(i) The BOCA National Building Code, 1993 Edition, The BOCA National..., Administration, for the Building, Plumbing and Mechanical Codes and the references to fire retardant treated wood... number 2 (Chapter 7) of the Building Code, but including the Appendices of the Code. Available from...
ADM. Administration Building (TAN602). Elevations, sections, details. Shows areas that ...
ADM. Administration Building (TAN-602). Elevations, sections, details. Shows areas that were soon remodeled or added onto. Ralph M. Parsons 902-2-ANP-602-A 32 Date: August 1955. Approved by INEEL Classification Office for public release. INEEL index code no. 033-0602-00-693-106711 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
127. ARAII Administrative and technical support building (ARA606) ground floor ...
127. ARA-II Administrative and technical support building (ARA-606) ground floor plan. Indicates use of rooms for classrooms, offices, and lunch room. C.A. Sundberg and Associates 866-area-ALPR-606-A-2. Date: June 1958. Ineel index code no. 070-0606-00-822-102825. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Building capacity for the conduct of nursing research at a Veterans Administration hospital.
Phelan, Cynthia H; Schumacher, Sandra; Roiland, Rachel; Royer, Heather; Roberts, Tonya
2015-05-01
Evidence is the bedrock of nursing practice, and nursing research is the key source for this evidence. In this article, we draw distinctions between the use and the conduct of nursing research and provide a perspective for how the conduct of nursing research in a Veterans Administration hospital can build an organization's capacity for nursing research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willen, E.
The development of superconducting wire and cable in the late 20th century enabled high field magnets and thus much higher beam collision energies in accelerators. These higher collision energies have allowed experiments to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are what these experiments seek to investigate. The subject has aroused the curiosity of not only scientists but of the public as well and has facilitated the support needed to build and operate such expensive machines and experiments.more » The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, with success and failure in uneven measure along the way. It is also a story of administrative imperatives that have had unpredictable effects on a project’s success, depending mostly on the people in the administrative roles and the decisions that they have made.« less
75 FR 42481 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-21
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, DOT. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws for the vessel SEAFLYER... Administration (MARAD), is authorized to grant waivers of the U.S.-build requirement of the coastwise laws under...
46. SOUTHEAST SIDE ELEVATION OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ...
46. SOUTHEAST SIDE ELEVATION OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
The politics of smoking in federal buildings: an executive order case study.
Cook, Daniel M; Bero, Lisa A
2009-09-01
Executive orders are important presidential tools for health policymaking that are subject to less public scrutiny than are legislation and regulatory rulemaking. President Bill Clinton banned smoking in federal government buildings by executive order in 1997, after the administration of George H. W. Bush had twice considered and abandoned a similar policy. The 1991 and 1993 Bush proposals drew objections from agency heads and labor unions, many coordinated by the tobacco industry. We analyzed internal tobacco industry documents and found that the industry engaged in extensive executive branch lobbying and other political activity surrounding the Clinton smoking ban. Whereas some level of stakeholder politics might have been expected, this policy also featured jockeying among various agencies and the participation of organized labor.
76 FR 74076 - Notice of Random Assignment Study To Evaluate the YouthBuild Program; Final Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-30
... Evaluate the YouthBuild Program; Final Notice AGENCY: Employment and Training Administration (ETA), Labor... rigorous, nationally-representative estimates of the net impacts of the YouthBuild program. The Department... study. In the sites randomly selected to participate in this evaluation, all applicants for YouthBuild...
A northwest view from the campus center building toward the ...
A northwest view from the campus center building toward the south side and east rear of the administration building. The former front entrance of the life sciences building is visible in the distance to the right. - San Bernardino Valley College, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
3. DETAIL VIEW OF THE MAIN ENTRY OF BUILDING 13, ...
3. DETAIL VIEW OF THE MAIN ENTRY OF BUILDING 13, SHOWING THE ORIGINAL LIGHT FIXTURES AND THE EGYPTIAN MOTIF DECORATION; LOOKING SSW. (Ryan) - Veterans Administration Medical Center, Building No. 13, Old State Route 13 West, Marion, Williamson County, IL
ERIC Educational Resources Information Center
Goldberger, Paul
1976-01-01
The Firemen's Training Center, New York City, consists of an administrative and teaching building built of corrugated metal and glass, with brightly colored interior spaces, and the actual training buildings, mock-ups of real buildings designed to "burn down" again and again in training sessions. (Author/MLF)
East side of the north wing of the building ...
East side of the north wing of the building - Fitzsimons General Hospital, Women's Army Corps Recreation & Administration Building, North Hickey Street, west side, 75 feet north of intersection of West Pennington Avenue & North Hickey Street, Aurora, Adams County, CO
The Design of Archives Buildings.
ERIC Educational Resources Information Center
Faye, Bernard
1982-01-01
Studies specific problems arising from design of archives buildings and examines three main purposes of this type of building, namely conservation, classification and restoration of archives, and the provision of access to them by administrators and research workers. Three references are listed. (Author/EJS)
1. Credit PSR. This view captures the main entrance to ...
1. Credit PSR. This view captures the main entrance to the Administration/Shops Building, constructed in 1963, looking north northeast (30°). The plaque at the base of the flagpole commemorates the first firing of a liquid-fueled rocket engine at Test Stand "A" in 1945. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA
131. ARAII Administration building (ARA613) floor plans for first and ...
131. ARA-II Administration building (ARA-613) floor plans for first and second floors. Includes roof plan. Shows use of rooms as offices, laboratory, conference room. F.C. Torkelson Company 842-area/SL-1-613-A-1. Date: October 1958. Ineel index code no. 070-0613-00-851-150718. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Integrating policy-based management and SLA performance monitoring
NASA Astrophysics Data System (ADS)
Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu
2001-10-01
Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the SNMP agents. The SNMP agents build the management information base (MIB) of all VPNs, policies and rules according to the relationships obtained from the management server. Thus, the proposed policy-based management system may get all performance monitoring information of VPNs and policies from agents. The proposed policy-based manager achieves two goals: a) provide a management environment for the system administrator to configure their network only considering the policy requirement issues and b) let the device have only to process the packet and then collect the required performance information. These two things make the proposed management system satisfy both the user and device requirements.
75 FR 43609 - Agency Information Collection Activities: Emergency Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... SOCIAL SECURITY ADMINISTRATION Agency Information Collection Activities: Emergency Request The Social Security Administration (SSA) publishes a list of information collection packages requiring...) Social Security Administration, DCBFM, Attn: Reports Clearance Officer, 1340 Annex Building, 6401...
ERIC Educational Resources Information Center
Von Bergen, C. W.; Soper, Barlow; Licata, Jane W.
2002-01-01
Explains why effective teachers need relationships of mutual respect and understanding with their supervisors. Makes suggestions for building relationships: understand administrators' objectives, pressures, strengths, weaknesses, and preferred styles; communicate needs clearly; and keep administrators informed. Describes incompetent types of…
FAA Statistical Handbook of Aviation: Calendar Year 1989
1989-01-01
Organization Report No 9 Performing Organization Name and Address 10 Nork Unit NO (TRAIS) Federal Aviation Administration Office of Management Systems 800...Cherry Lane. Street, NE,P.O. Box 56445, Atlanta, GA 30343; Laurel, MD 20707; (301) 953-7974 or 792-0262 (404) 331-6947T LOS ANGELES, CA _RMINGHAM, AL...ARCO Plaza, C-Level, 505 South Flower Street, O’Neill Building, 2021 Third Avenue, North, Bir- Los Angeles, CA 90071; (213) 894-5841 mingham, AL
Commercial Buildings Energy Consumption Survey - Office Buildings
2010-01-01
Provides an in-depth look at this building type as reported in the 2003 Commercial Buildings Energy Consumption Survey. Office buildings are the most common type of commercial building and they consumed more than 17% of all energy in the commercial buildings sector in 2003. This special report provides characteristics and energy consumption data by type of office building (e.g. administrative office, government office, medical office) and information on some of the types of equipment found in office buildings: heating and cooling equipment, computers, servers, printers, and photocopiers.
Building capacity in VA to provide emergency gynecology services for women.
Cordasco, Kristina M; Huynh, Alexis K; Zephyrin, Laurie; Hamilton, Alison B; Lau-Herzberg, Amy E; Kessler, Chad S; Yano, Elizabeth M
2015-04-01
Visits to Veterans Administration (VA) emergency departments (EDs) are increasingly being made by women. A 2011 national inventory of VA emergency services for women revealed that many EDs have gaps in their resources and processes for gynecologic emergency care. To guide VA in addressing these gaps, we sought to understand factors acting as facilitators and/or barriers to improving VA ED capacity for, and quality of, emergency gynecology care. Semistructured interviews with VA emergency and women's health key informants. ED directors/providers (n=14), ED nurse managers (n=13), and Women Veteran Program Managers (n=13) in 13 VA facilities. Leadership, staff, space, demand, funding, policies, and community were noted as important factors influencing VA EDs building capacity and improving emergency gynecologic care for women Veterans. These factors are intertwined and cross multiple organizational levels so that each ED's capacity is a reflection not only of its own factors, but also those of its local medical center and non-VA community context as well as VA regional and national trends and policies. Policies and quality improvement initiatives aimed at building VA's emergency gynecologic services for women need to be multifactorial and aimed at multiple organizational levels. Policies need to be flexible to account for wide variations across EDs and their medical center and community contexts. Approaches that build and encourage local leadership engagement, such as evidence-based quality improvement methodology, are likely to be most effective.
48. FRONT ENTRY DETAIL ON SOUTHWEST ELEVATION OF BUILDING 361 ...
48. FRONT ENTRY DETAIL ON SOUTHWEST ELEVATION OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
3. DETAIL VIEW OF S ENTRY DOOR TO BUILDING 8, ...
3. DETAIL VIEW OF S ENTRY DOOR TO BUILDING 8, SHOWING ONE OF THE ORIGINAL LIGHT FIXTURES AND THE EGYPTIAN MOTIF DECORATION; LOOKING N (Ryan) - Veterans Administration Medical Center, Building No. 8, Old State Route 13 West, Marion, Williamson County, IL
49 CFR 41.119 - DOT regulated buildings.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Each DOT Operating Administration with responsibility for regulating the structural safety of buildings... section pertains to all new building projects for which development of detailed plans and specifications... regulating the structural safety must comply with the seismic design and construction standards in this part...
75 FR 54960 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 28101 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 51464 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 6184 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 51467 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 13701 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-14
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 11991 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 38865 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 30236 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 820 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 14487 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 38269 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-29
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Department of Transportation, Maritime Administration. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 5171 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 14486 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 5172 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 11561 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 51466 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 6183 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 6433 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-09
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 11560 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 4419 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 29331 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 25924 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 9021 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 46893 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 51465 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 35943 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 38864 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 11558 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 35517 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-22
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 14485 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 9020 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 49553 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 47679 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 35944 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 39152 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 35945 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 46894 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 2592 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 75545 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws.... build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 75543 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws.... build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 56655 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 56656 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 9402 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-17
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 40981 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....- build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
76 FR 40983 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 52064 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-24
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 75544 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
75 FR 2591 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
Scout: An Impact Analysis Tool for Building Energy-Efficiency Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, Chioke; Langevin, Jared; Roth, Amir
Evaluating the national impacts of candidate U.S. building energy-efficiency technologies has historically been difficult for organizations with large energy efficiency portfolios. In particular, normalizing results from technology-specific impact studies is time-consuming when those studies do not use comparable assumptions about the underlying building stock. To equitably evaluate its technology research, development, and deployment portfolio, the U.S. Department of Energy's Building Technologies Office has developed Scout, a software tool that quantitatively assesses the energy and CO2 impacts of building energy-efficiency measures on the national building stock. Scout efficiency measures improve upon the unit performance and/or lifetime operational costs of an equipmentmore » stock baseline that is determined from the U.S. Energy Information Administration Annual Energy Outlook (AEO). Scout measures are characterized by a market entry and exit year, unit performance level, cost, and lifetime. To evaluate measures on a consistent basis, Scout uses EnergyPlus simulation on prototype building models to translate measure performance specifications to whole-building energy savings; these savings impacts are then extended to a national scale using floor area weighting factors. Scout represents evolution in the building stock over time using AEO projections for new construction, retrofit, and equipment replacements, and competes technologies within market segments under multiple adoption scenarios. Scout and its efficiency measures are open-source, as is the EnergyPlus whole building simulation framework that is used to evaluate measure performance. The program is currently under active development and will be formally released once an initial set of measures has been analyzed and reviewed.« less
Contextual view of Treasure Island from Yerba Buena Island, showing ...
Contextual view of Treasure Island from Yerba Buena Island, showing Palace of Fine and Decorative Arts (Building 3), far right, Hall of Transportation (Building 2), middle, and The Administration Building (Building 1), far left, Port of Trade Winds is in foreground, camera facing northwest - Golden Gate International Exposition, Treasure Island, San Francisco, San Francisco County, CA
23 CFR 636.202 - When are two-phase design-build selection procedures appropriate?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false When are two-phase design-build selection procedures appropriate? 636.202 Section 636.202 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.202 When are two-phase design-build...
Building competencies for nurse administrators in the Republic of Georgia.
Nishiyama, M; Wold, J L; Partskhladze, N
2008-06-01
To assess the level of competency among nurse administrators in the Republic of Georgia (Georgia) and to recommend interventions to implement effective nursing management practices in a resource constrained setting. The collapse of the Soviet Union in 1991 resulted in deterioration of the healthcare system in Georgia. Even though the 1995 healthcare reformers recognized that baccalaureate educated nurses were essential resources for quality health care, limited resources delayed further steps. Hence, Georgia has struggled to raise nursing education levels and to establish nursing as a professional occupation. Using an exploratory descriptive research technique, surveys of nurse managers were conducted in 2004 and in 2005. This study assessed the level of practice among Georgian nurse administrators compared with the international competencies of the International Council of Nurses. There were no organized procedures to evaluate competencies of nurses on a regular basis. While minimal clinical nursing practice guidelines exist, nurse managers did not fully utilize them for either mentoring the staff nurses or assuring an adequate quality of nursing care. Many nurse managers viewed financial constraints as an obstacle to delivering better nursing care. Recommendations include: (1) establishing effective protocols to evaluate the competencies of nurses, (2) mandating the use of existing nursing guidelines, (3) establishing effective resource inventory systems, and (4) mandating safety education and ensuring a safe work environment.
41 CFR 101-5.102 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... administrative services and facilities provided to occupying agencies in Federal buildings or nearby locations in... agencies in multi-tenant federally occupied buildings. [56 FR 33873, July 24, 1991] ...
3. N ELEVATION OF BUILDING 1'S E WING, SHOWING THE ...
3. N ELEVATION OF BUILDING 1'S E WING, SHOWING THE PILASTERS, TERRA COTTA PANELS, AND THE EGYPTIAN MOTIF DECORATIVE CORNICE ELEMENTS; LOOKING S. (Ryan) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
14. OVERALL VIEW OF ELEVATOR LOBBY OF BUILDING 1, SHOWING ...
14. OVERALL VIEW OF ELEVATOR LOBBY OF BUILDING 1, SHOWING THE CONTINUATION OF THE EGYPTIAN MOTIF DECORATIVE DETAIL; LOOKING NNW TOWARD THE MAIN LOBBY. (Ryan & Harms) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
76 FR 11558 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation. ACTION: Invitation for public comments on a requested administrative waiver of the Coastwise Trade Laws... the U.S.-build requirement of the coastwise laws under certain circumstances. A request for such a...
ERIC Educational Resources Information Center
Blümel, Albrecht
2016-01-01
By analysing institutional changes of administrative leadership at German universities, this paper studies the construction of organizational boundaries as an important aspect of organizational transformation of universities as complete organizations. Building on an analysis of the formal status of administrative leadership at universities derived…
78 FR 30390 - Applications Delayed More Than 180 Days
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Applications Delayed More Than 180 Days AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...
77 FR 58903 - Agency Information Collection Activities: Proposed Request and Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... SOCIAL SECURITY ADMINISTRATION Agency Information Collection Activities: Proposed Request and Comment Request The Social Security Administration (SSA) publishes a list of information collection... . (SSA), Social Security Administration, DCRDP, Attn: Reports Clearance Director, 107 Altmeyer Building...
78 FR 22935 - Agency Information Collection Activities; Proposed Request and Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-17
... SOCIAL SECURITY ADMINISTRATION Agency Information Collection Activities; Proposed Request and Comment Request The Social Security Administration (SSA) publishes a list of information collection... . (SSA) Social Security Administration, DCRDP, Attn: Reports Clearance Director, 107 Altmeyer Building...
77 FR 37728 - Agency Information Collection Activities: Proposed Request and Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... SOCIAL SECURITY ADMINISTRATION Agency Information Collection Activities: Proposed Request and Comment Request The Social Security Administration (SSA) publishes a list of information collection...), Social Security Administration, DCRDP, Attn: Reports Clearance Director, 107 Altmeyer Building, 6401...
Photocopy of photograph (original print is located at Engineering Management ...
Photocopy of photograph (original print is located at Engineering Management Building, Naval Shipyard, Long Beach). Navy Photography, July 4, 1942, Photograph #2225. CONSTRUCTION OF BUILDING 1 - Roosevelt Base, Administration & Brig Building, Bounded by Nevada & Colorado Streets, Reeves & Richardson Avenues, Long Beach, Los Angeles County, CA
4. DETAIL VIEW OF NW CORNER OF BUILDING 1'S W ...
4. DETAIL VIEW OF NW CORNER OF BUILDING 1'S W WING, SHOWING THE PILASTERS, TERRA COTTA PANELS, AND THE EGYPTIAN MOTIF DECORATIVE CORNICE ELEMENTS; LOOKING ENE. (Harms) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
29 CFR 1918.82 - Building drafts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 7 2011-07-01 2011-07-01 false Building drafts. 1918.82 Section 1918.82 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Handling Cargo § 1918.82 Building drafts. (a) Drafts shall...
29 CFR 1918.82 - Building drafts.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 7 2014-07-01 2014-07-01 false Building drafts. 1918.82 Section 1918.82 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Handling Cargo § 1918.82 Building drafts. (a) Drafts shall...
29 CFR 1918.82 - Building drafts.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 7 2012-07-01 2012-07-01 false Building drafts. 1918.82 Section 1918.82 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Handling Cargo § 1918.82 Building drafts. (a) Drafts shall...
29 CFR 1918.82 - Building drafts.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 7 2013-07-01 2013-07-01 false Building drafts. 1918.82 Section 1918.82 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING Handling Cargo § 1918.82 Building drafts. (a) Drafts shall...
Building Trades 1. Course Outline.
ERIC Educational Resources Information Center
Hill, Clair S.
Intended to assist building trades instructors, this course outline to a prevocational building trades program for junior and senior high school students covers four occupational areas: carpentry, masonry, plumbing, and electricity. Specific notes to the administrator and teacher and the course goals precede the four occupational units. Each unit…
9. INTERIOR, BUILDING 320, MAIN GALLEY, FROM SOUTH WALL OF ...
9. INTERIOR, BUILDING 320, MAIN GALLEY, FROM SOUTH WALL OF ROOM, LOOKING NORTH, WITH KITCHEN HOOD OVERHEAD, AND DOOR TO REFRIGERATION ROOM ON OPPOSITE WALL. - Oakland Naval Supply Center, Administration Building-Cafeteria, East of Third Street between D & E Streets, Oakland, Alameda County, CA
5. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
5. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
11. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
11. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
7. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
7. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
12. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
12. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
10. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
10. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
6. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
6. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
14. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
14. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
8. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
8. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
13. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
13. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
9. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
9. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
4. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from ...
4. Historic American Buildings Survey ARCHITECT'S DRAWING Copy negative from book published by Secretary of Treasury, 1857, consisting of 21 plates. In office of the Building Manager, General Services Administration, New Orleans - U.S. Custom House, 423 Canal Street, New Orleans, Orleans Parish, LA
23 CFR 636.208 - May I use my existing prequalification procedures with design-build contracts?
Code of Federal Regulations, 2010 CFR
2010-04-01
... design-build contracts? 636.208 Section 636.208 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria... use your existing prequalification procedures for either construction or engineering design firms as a...
Mesa Community College at Red Mountain, Mesa, Arizona.
ERIC Educational Resources Information Center
Design Cost Data, 2002
2002-01-01
Describes the Desert Willow Library and Classroom Building, Mesquite Student Services and Administration Building, Palo Verde Science Laboratories and Classroom Building, and Ironwood Central Plant of the title college, including educational context and design goals. Includes a general description; information on the architect, construction team,…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... Claims, for releases of claims under construction and building service contracts, was inadvertently... the release of claims under construction and building service contracts. At this time, consideration... for releases of claims under construction and building service contracts, was inadvertently deleted as...
23 CFR 636.104 - Does this part apply to all Federal-aid design-build projects?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Does this part apply to all Federal-aid design-build projects? 636.104 Section 636.104 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.104 Does this part apply to all Federal-aid design-build projects? The...
23 CFR 636.105 - Is the FHWA requiring the use of design-build?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Is the FHWA requiring the use of design-build? 636.105 Section 636.105 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.105 Is the FHWA requiring the use of design-build? No, the FHWA is neither requiring nor...
The Politics of Smoking in Federal Buildings: An Executive Order Case Study
Bero, Lisa A.
2009-01-01
Executive orders are important presidential tools for health policymaking that are subject to less public scrutiny than are legislation and regulatory rulemaking. President Bill Clinton banned smoking in federal government buildings by executive order in 1997, after the administration of George H. W. Bush had twice considered and abandoned a similar policy. The 1991 and 1993 Bush proposals drew objections from agency heads and labor unions, many coordinated by the tobacco industry. We analyzed internal tobacco industry documents and found that the industry engaged in extensive executive branch lobbying and other political activity surrounding the Clinton smoking ban. Whereas some level of stakeholder politics might have been expected, this policy also featured jockeying among various agencies and the participation of organized labor. PMID:19608948
Final Report. Solar Assist for Administration Building and Community Gym/Pool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Synder, Randy; Bresette, Joseph
2015-06-23
Tonto Apache Tribe applied to the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2013 to implement a solar project to reduce energy use in two tribal buildings. Total estimated project cost was $804,140, with the Department and Tribe each providing 50% of the project costs. Photovoltaic systems totaling 75 kW on the Administration Building and 192 kW on the Gymnasium were installed. We used roof tops and installed canopies in adjacent parking areas for mounting the systems. The installed systems were designed to offset 65% of the facilities electric load.
Elements of Successful Plant Management.
ERIC Educational Resources Information Center
Sweitzer, John H.
The physical plant administrator manages men, money and materials to create the best possible physical environment for the educational processes at his institution. Areas of concern of the plant administrator are administration, building maintenance, janitorial services, traffic, security and safety, utilities, grounds, alterations, and…
15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...
15. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). DETAILS OF NORTH ELEVATION, STORE FRONT, SCREEN IN GENERAL WAITING ROOM, COUNTER IN RENTING OFFICE, AND COUNTER IN CASHIER'S OFFICE, ADMINISTRATION BUILDING AND STORE, TECHWOOD PROJECT #1101, SHEET A-57. - Techwood Homes, Store & Administration Building, 114-138 Merrit Avenue, Atlanta, Fulton County, GA
ERIC Educational Resources Information Center
Cirillo, Susan E., Ed.; Danford, Robert E., Ed.
These proceedings are the record of the presentations and deliberations of a 1993 Library Administration and Management Association (LAMA) sponsored conference. The speakers at this conference provided insights into the conditions of disability explanations of the intent and the detail of the law, and techniques for meeting the needs of library…
Administrator Leadership Styles and Their Impact on School Nursing.
Davis, Charles R
2018-01-01
In comparison to other professional staff in an educational based setting, the registered professional school nurse has unique roles, responsibilities, education, training, and scope of practice. In carrying out this unique and specialized role, school nurses operate under a building administrator, the leader of the building and often the immediate supervisor of the school nurse. In addition, many school nurses in small districts are the only registered professional nurse employed by the school. The building administrator's leadership style not only sets the tone for the day-to-day operations in the school but also impacts the school nurse functioning and program implementation. This article reviews the three most common types of leadership styles as defined by Kurt Lewin-laissez-faire, democratic, and coercive/authoritarian-and their potential impact on school nursing practice. In addition, the article provides recommendations for school nurses for successful practice with regard to supervisor leadership styles.
10. OVERALL VIEW OF THE MAIN LOBBY OF BUILDING 1; ...
10. OVERALL VIEW OF THE MAIN LOBBY OF BUILDING 1; SHOWING EGYPTIAN MOTIF DECORATIVE DETAIL OF THE ENGAGED COLUMNS, CORNICE & SOFFIT, DEDICATION PLAQUE, AND FLOOR MOSAICS; LOOKING SE. (Ryan & Harms) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
77 FR 18799 - Proposed Agency Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
... Buildings Energy Consumption Survey.'' The Federal Energy Administration Act of 1974 (Pub. L. 93-275, 15 U.S... Buildings Energy Consumption Survey (CBECS) has been conducted nine times covering the years 1979, 1983 and 1986 under the name of the ``Nonresidential Buildings Energy Consumption Survey,'' and years 1989, 1992...
49 CFR 41.117 - Buildings built with Federal assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Buildings built with Federal assistance. 41.117 Section 41.117 Transportation Office of the Secretary of Transportation SEISMIC SAFETY § 41.117 Buildings built with Federal assistance. (a) Each DOT Operating Administration assisting in the financing, through...
75 FR 10344 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
...: Intended Commercial Use of Vessel: ``Designation sightseeing cruises, team building cruise, Employee reward....-build requirement of the coastwise laws under certain circumstances. A request for such a waiver has... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. You may also send...
South side of the west wing of the building and ...
South side of the west wing of the building and part of the east side of the north wing - Fitzsimons General Hospital, Women's Army Corps Recreation & Administration Building, North Hickey Street, west side, 75 feet north of intersection of West Pennington Avenue & North Hickey Street, Aurora, Adams County, CO
Building Budgets and Trust through the Alchemy of Superintendent Leadership
ERIC Educational Resources Information Center
Bird, James J.
2010-01-01
Superintendents have the burden and the opportunity to exert leadership through the budget-building process. This article details a dozen tenets which can be implemented by practicing superintendents. Doing so increases the chances of building trust among the stakeholders of administrators, staff, community, and school board members. The district…
Code of Federal Regulations, 2010 CFR
2010-04-01
... under the HUD building product standards and certification program for particleboard interior stair... Supplementary specific requirements under the HUD building product standards and certification program for... forth in § 200.935(d)(6) concerning labeling of a product, the administrator's validation mark and the...
The Relationship between Building Teacher Leadership Capacity and Campus Culture
ERIC Educational Resources Information Center
Harris, Dawn R.; Kemp-Graham, Kriss Y.
2017-01-01
The purpose of this explanatory sequential mixed methods research study was to explore the relationship between building teacher leadership capacity and campus culture in a suburban East Texas school district. Developing teacher leaders by building leadership capacity depends on administrators' abilities to develop leaders from within the existing…
Support for Special Education Administrators: A Framework for Building and Sustaining Capacity
ERIC Educational Resources Information Center
Adams, James S.
2013-01-01
Research supports evidence indicating a nationwide concern that administrative training programs are not meeting the needs of Special Education Administrators. Additionally, researchers suggest that the need to have well prepared special education administrators (SEAs) is greater now than ever before and the demand for SEAs exceeds the supply of…
Teacher Trust in District Administration: A Promising Line of Inquiry
ERIC Educational Resources Information Center
Adams, Curt M.; Miskell, Ryan C.
2016-01-01
Purpose: We set out in this study to establish a foundation for a line of inquiry around teacher trust in district administration by (1) describing the role of trust in capacity building, (2) conceptualizing trust in district administration, (3) developing a scale to measure teacher trust in district administration, and (4) testing the…
Tips for Carpeting Your Student Union Building.
ERIC Educational Resources Information Center
Barbacci, Diann
2001-01-01
Presents guidelines for enhancing the investment value of carpeting in student union buildings, foyers and hallways, administrative offices, cafeterias and food courts, and recreation areas. Color coordination is briefly discussed. (GR)
4. View east, front side (Building 8 on right) ...
4. View east, front side (Building 8 on right) - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS
Building, north side (original front), detail of original entrance. Camera ...
Building, north side (original front), detail of original entrance. Camera facing south - Naval Supply Center, Broadway Complex, Administration Storehouse, 911 West Broadway, San Diego, San Diego County, CA
Review of retrofit strategies decision system in historic perspective
NASA Astrophysics Data System (ADS)
Bostenaru Dan, M. D.
2004-06-01
Urban development is a process. In structuring and developing its phases different actors are implied, who act under different, sometimes opposite, dynamic conditions and within different reference systems. This paper aims to explore the contribution of participatism to disaster mitigation, when this concerns earthquake impact on urban settlements, through the support provided to multi-criteria decision in matters of retrofit. The research broadness in field of decision making on one side and the lack of a specific model for the retrofit of existing buildings on another side led to an extensive review of the state of the art in related models to address the issue. Core idea in the selection of existing models has been the preoccupation for collaborative issues, in other words, the consideration for the different actors implied in the planning process. The historic perspective on participative planning models is made from the view of two generations of citizen implication. The first approaches focus on the participation of the building owner/inhabitant in the planning process of building construction. As current strategies building rehabilitation and selection from alternative retrofit strategies are presented. New developments include innovative models using the internet or spatial databases. The investigated participation approaches show, that participation and communication as a more comprehensive term are an old topic in the field politics-democratisation-urbanism. In all cases it can be talked of "successful learning processes", of the improvement of the level of the professional debate. More than 30 years history of participation marked a transition in understanding the concept: from participation, based on a central decision process leading to a solution controlled and steered by the political-administrative system, to communication, characterised by simultaneous decision processes taking place outside politics and administration in co-operative procedures.
NASA Acting Administrator Robert Lightfoot All Hands
2017-08-15
At NASA's Kennedy Space Center in Florida, agency Acting Administrator Robert Lightfoot and Deputy Associate Administrator Lesa Roe speak to employees during a town hall meeting in the conference room of Operations Support Building II. During the gathering, they updated progress on NASA programs.
NASA Technical Reports Server (NTRS)
Sager, Eric D.
2016-01-01
The Hazardous and Solid Waste Amendment portion of the National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) Permit issued by the Florida Department of Environmental Protection (FDEP), requires identification and evaluation of all known Solid Waste Management Units (SWMUs) and Locations of Concern (LOCs) located on Kennedy Space Center (KSC) property. The KSC Headquarters Building Area (KHQA) has been identified as SWMU 104 under KSC's RCRA Program. This report summarizes the Interim Measure (IM) conducted by Geosyntec Consultants (Geosyntec) for NASA under Indefinite Delivery Indefinite Quantity Contract NNK12CA13B at the KHQA to mitigate potential exposure to polychlorinated biphenyl (PCB)-affected media at the eastern side of LOC 2E. The IM activities were conducted in June and July 2015 to remediate PCBs above the FDEP Residential Direct-Exposure (R-) Soil Cleanup Target Level (SCTL) of 0.5 milligram per kilogram (mg/kg) established by Chapter 62-777, Florida Administrative Code. The IM was performed in accordance with the IM Work Plan (IMWP) approved by the FDEP, dated August 2012. IM activities were conducted in accordance with the KSC Generic PCB Work Plan (NASA 2007).
43 CFR 3832.34 - How may I use my mill site?
Code of Federal Regulations, 2014 CFR
2014-10-01
... recovery); (2) Mine administrative and support buildings, warehouses and maintenance buildings, electrical... treatment plants; and (6) Any other use that is reasonably incident to mine development and operation...
Energy Retrofits Can Ease the Budget Squeeze.
ERIC Educational Resources Information Center
Nordeen, Howard
1983-01-01
Computer-based building management systems can cut the energy costs of heating, ventilating, and air conditioning (HVAC) systems in school buildings. Administrators are advised on how to choose the best system. (MLF)
Mori, Mihoko; Hara, Kunio; Miyakita, Takashi; Ishitake, Tatsuya
2011-01-01
Several users of a newly built school building in a university (new building) complained about their deteriorating physical health. We measured the air quality in the new building, an old school building and atmosphere in September 2007 and February 2008. We also conducted a questionnaire survey of subjective symptoms of users in the new building in February 2008. The university administrator took some remedial actions to improve the indoor air quality after the first measurement. In September 2007, the concentrations of total volatile organic compounds (TVOCs) and 2-ethyl-1-hexanol in the new building were higher than those in the old building and atmosphere. Moreover, the concentrations of TVOCs exceeded the Japanese recommended guideline values. In February 2008, the concentrations of these substances in the new building were lower than the previous values. Out of the 177 users who were surveyed regarding subjective symptoms, 59 responded to the survey. In September 2007, 21 users felt that their physical health had deteriorated, while in February 2008, 12 users felt no deterioration. However, nine users still complained about the deterioration of their physical health. It was suggested that the improvement in the indoor air quality may be influenced by the decrease in room temperature. Even if the concentrations of VOCs are below the recommended guideline values, users with an enhanced sensitivity towards VOCs may lose their tolerance to low-level VOCs. Our findings suggested that a survey of the changes in the subjective symptoms of users should be conducted to evaluate the improvement in the indoor air quality of newly built buildings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rubinstein, Francis M.
Specific recommendations are made to improve the lighting quality and energy efficiency of the lighting system at the Social Security Administration Frank Hagel Building in Richmond, CA. The main recommendation is to replace the recessed fluorescent lighting system in the general office area with indirect lighting. Indirect lighting will improve lighting quality, will provide an energy efficient solution and will be about the same cost as the direct lighting system originally proposed.
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
2006-02-01
Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A
2. Historic American Buildings Survey W. N. Manning, Photographer, June ...
2. Historic American Buildings Survey W. N. Manning, Photographer, June 11, 1935. OLD LAW OFFICE (REPRODUCTION) (FROM EMERGENCY RELIEF ADMINISTRATION PHOTO) - Nolan Crenshaw House, County Road 54, Greenville, Butler County, AL
75 FR 1345 - Solicitation of Applications for the Community Trade Adjustment Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
... Administration, Seattle Regional Office, Jackson Federal Building, Room 1890, 915 Second Avenue, Seattle... Community TAA Program supplements and builds upon the other TAA programs by providing comprehensive...
2. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 1) ...
2. OVERALL VIEW OF THE MEDICAL CENTER (ESPECIALLY BUILDING 1) FROM THE 'CAMPUS' GROUNDS; LOOKING SW. (Harms) - Veterans Administration Medical Center, Old State Route 13 West, Marion, Williamson County, IL
22. Photographer unknown, 1956 AERIAL VIEW, LOOKING SOUTHSOUTHEAST, BUILDING 20 ...
22. Photographer unknown, 1956 AERIAL VIEW, LOOKING SOUTH-SOUTHEAST, BUILDING 20 AT LEFT. DARK AREAS ARE LANDSCAPED. - U. S. Veterans Administration Medical Center, 2100 Ridgecrest Southeast, Albuquerque, Bernalillo County, NM
Involving Building Administrators in Planning for Inclusive Educational Programs.
ERIC Educational Resources Information Center
Morgan, Carl R.; Demchak, Mary Ann
1998-01-01
School administrators must provide leadership in implementing inclusive education by taking ownership of inclusive programs; becoming informed; and promoting open communication between parents, teachers, and board members. Strategies for implementing inclusive programs must consider roles of general- and special-education teachers, administrators,…
GENERAL VIEW OF THE MARTIN BOMBER PLANT LOOKING SOUTHWEST FROM ...
GENERAL VIEW OF THE MARTIN BOMBER PLANT LOOKING SOUTHWEST FROM "HOSPITAL HILL" SHOWING FROM THE LEFT THE METAL & PAPER SALVAGE BUILDING, AIRCRAFT MANUFACTURING AND ASSEMBLY BUILDING, BOILER HOUSE, OIL HOUSE, AND ADMINISTRATION BUILDLING. - Offutt Air Force Base, Glenn L. Martin-Nebraska Bomber Plant, Building D, Peacekeeper Drive, Bellevue, Sarpy County, NE
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
..., occupational skills training, and employment services to disadvantaged youth in their communities while... Solicitation for Grant Applications for YouthBuild Grants AGENCY: Employment and Training Administration, Labor... Workforce Investment Act [29 U.S.C. 2918a]. YouthBuild grants will be awarded through a competitive process...
Identifying Low Cost Energy Improvements for School Buildings: An Energy Audit Manual.
ERIC Educational Resources Information Center
Minnesota State Dept. of Energy and Economic Development, St. Paul.
This manual is a guide for performing energy audits in school buildings using low- and no-cost measures found effective in Minnesota. The manual helps school maintenance and administrative personnel conduct walk-through inspections of school buildings, focusing on the energy efficiency of their equipment and operations. The measures recommended…
Code of Federal Regulations, 2010 CFR
2010-04-01
... INTRODUCTION TO FHA PROGRAMS Minimum Property Standards § 200.949 Building product standards and certification... product, the administrator's certification of compliance with the applicable standards is required to be... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Building product standards and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... INTRODUCTION TO FHA PROGRAMS Minimum Property Standards § 200.947 Building product standards and certification... product, the administrator's certification of compliance with the applicable standards and the type of... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Building product standards and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...
Planning Educational Facilities for the Next Century.
ERIC Educational Resources Information Center
Earthman, Glen I.
A school building constructed 10 years ago may not be relevant to what is needed in a new building today. Methodology and curriculum change rapidly, and, as a result, buildings change as do the students attending schools today. The administrators in the school system are responsible for adequately planning a new capital-improvement project and…
2. A 1993 'rephotograph' of the 1917 context view (WA203A1) ...
2. A 1993 're-photograph' of the 1917 context view (WA-203-A-1) looking east along Farragut Avenue. Building 78 is the brick building on right. Building 59 (Pattern Shop) is the brick building on left side of street, just beyond the tallest modern building. The 1917 view was taken from a hill which was later removed. The 1993 view was taken from a lift at the estimated height/position of the former hill. - Puget Sound Naval Shipyard, Administration Building, Farragut Avenue, Bremerton, Kitsap County, WA
77 FR 64346 - Nonprescription Drugs Advisory Committee; Amendment of Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave., Building 31... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0001] Nonprescription Drugs Advisory Committee; Amendment of Notice AGENCY: Food and Drug Administration, HHS. ACTION...
NASA Acting Administrator Robert Lightfoot All Hands
2017-08-15
At NASA's Kennedy Space Center in Florida, agency Acting Administrator Robert Lightfoot speaks to employees during a town hall meeting in the conference room of Operations Support Building II. To the right is Deputy Associate Administrator Lesa Roe. During the gathering, they updated progress on NASA programs.
ERIC Educational Resources Information Center
Dimmock, Clive; Walker, Allan
1998-01-01
Advocates a stronger comparative emphasis in the study of educational administration and management while acknowledging comparative educational administration's weak knowledge base. Clarifies the potential import of a comparative, cross-cultural perspective embracing five societal/cultural dimensions: individualism versus collectivism, power…
12. DETAIL VIEW OF DEDICATION PLAQUE & ITS SURROUNDING TABERNACLE ...
12. DETAIL VIEW OF DEDICATION PLAQUE & ITS SURROUNDING TABERNACLE FRAME; MAIN LOBBY OF BUILDING 1, LOOKING E. (Ryan) - Veterans Administration Medical Center, Building No. 1, Old State Route 13 West, Marion, Williamson County, IL
INTERIOR OFFICES AT THE SOUTHERN END OF THE BUILDING, LOOKING ...
INTERIOR OFFICES AT THE SOUTHERN END OF THE BUILDING, LOOKING SOUTH - Eglin Air Force Base, Storehouse & Company Administration, Southeast of Flager Road, Nassau Lane, & southern edge of Weekly Bayou, Valparaiso, Okaloosa County, FL
78 FR 27968 - Federal Management Regulation; Redesignations of Federal Buildings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
... Buildings Service (PBS), 1800 F Street NW., Washington, DC 20405, telephone number: 202-501-1100. Dan...-501-1100. Dan Tangherlini, Acting Administrator of General Services. [FR Doc. 2013-11247 Filed 5-10-13...
Transit green building action plan : report to congress
DOT National Transportation Integrated Search
2009-06-04
The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...
25. Photocopy of aerial photograph dated May 1930; J. E. ...
25. Photocopy of aerial photograph dated May 1930; J. E. Quigley, Photographer; original filed as MR2.9/SP8/p355 in Audio-visual Collection of Minnesota Historical Society, St. Paul; SHOWS RECENTLY COMPLETED NORTHWEST HANGAR AND ADMINISTRATION BUILDING I N UPPER LEFT (THREE-QUARTER VIEW OF WEST SIDE AND SOUTH FRONT); ALSO SHOWS THE SIMILARLY DESIGNED MUNICIPAL HANGAR UNDER CONSTRUCTION IN FOREGROUND; LOOKING NORTHEAST - Northwest Airways Hangar & Administration Building, 590 Bayfield Street, St. Paul Downtown Airport (Holman), Saint Paul, Ramsey County, MN
Population Estimation Using a 3D City Model: A Multi-Scale Country-Wide Study in the Netherlands
Arroyo Ohori, Ken; Ledoux, Hugo; Peters, Ravi; Stoter, Jantien
2016-01-01
The remote estimation of a region’s population has for decades been a key application of geographic information science in demography. Most studies have used 2D data (maps, satellite imagery) to estimate population avoiding field surveys and questionnaires. As the availability of semantic 3D city models is constantly increasing, we investigate to what extent they can be used for the same purpose. Based on the assumption that housing space is a proxy for the number of its residents, we use two methods to estimate the population with 3D city models in two directions: (1) disaggregation (areal interpolation) to estimate the population of small administrative entities (e.g. neighbourhoods) from that of larger ones (e.g. municipalities); and (2) a statistical modelling approach to estimate the population of large entities from a sample composed of their smaller ones (e.g. one acquired by a government register). Starting from a complete Dutch census dataset at the neighbourhood level and a 3D model of all 9.9 million buildings in the Netherlands, we compare the population estimates obtained by both methods with the actual population as reported in the census, and use it to evaluate the quality that can be achieved by estimations at different administrative levels. We also analyse how the volume-based estimation enabled by 3D city models fares in comparison to 2D methods using building footprints and floor areas, as well as how it is affected by different levels of semantic detail in a 3D city model. We conclude that 3D city models are useful for estimations of large areas (e.g. for a country), and that the 3D approach has clear advantages over the 2D approach. PMID:27254151
Race and Gender Bias in the Administration of Corporal Punishment.
ERIC Educational Resources Information Center
Shaw, Steven R.; Braden, Jeffery B.
1990-01-01
Examined disciplinary actions taken by school building administrators after receiving discipline referral to identify evidence of race and gender bias in administration of corporal punishment (CP). Analysis of discipline files (n=6,244) demonstrated statistically significant relationships between race and CP and between gender and CP. Results…
10 CFR 455.150 - Right to administrative review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Right to administrative review. 455.150 Section 455.150 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION GRANT PROGRAMS FOR SCHOOLS AND HOSPITALS AND BUILDINGS OWNED BY UNITS OF LOCAL GOVERNMENT AND PUBLIC CARE INSTITUTIONS Administrative Review § 455.150 Right to...
10 CFR 455.151 - Notice requesting administrative review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Notice requesting administrative review. 455.151 Section 455.151 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION GRANT PROGRAMS FOR SCHOOLS AND HOSPITALS AND BUILDINGS OWNED BY UNITS OF LOCAL GOVERNMENT AND PUBLIC CARE INSTITUTIONS Administrative Review § 455.151...
Why Block Grants Should Increase Administrative Costs.
ERIC Educational Resources Information Center
Baker, Keith
1983-01-01
Federal education programs increase costs because they attach fewer strings to funds than state or local grants, and this is likely to lead to administrative empire-building. Bureaucracy tends pathologically as it grows to generate more work for itself independent of true administrative needs. Some policy implications are drawn. (MJL)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... public administration and are necessary tools for maintaining and demonstrating system integrity. The use... DEPARTMENT OF LABOR Employment and Training Administration Comment Request for Information... AGENCY: Employment and Training Administration. ACTION: Notice. SUMMARY: The Department of Labor, as part...
49 CFR 601.2 - Organization of the administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and U.S. Virgin Islands FTA Regional Administrator, One Bowling Green, Room 429, New York, NY 10014... Administrator, Jackson Federal Building, 915 Second Avenue, Suite 3142, Seattle, WA 98174-1002 (206) 220-7954 Lower Manhattan Recovery Office FTA LMRO Director, One Bowling Green, Room 436, New York, NY 10004 (212...
75 FR 75543 - Requested Administrative Waiver of the Coastwise Trade Laws
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... Administrative Waiver of the Coastwise Trade Laws AGENCY: Maritime Administration, Department of Transportation... Coastwise Trade Laws for the vessel SITARA. SUMMARY: As authorized by 46 U.S.C. 12121, the Secretary of.... build requirement of the coastwise laws under certain circumstances. A request for such a waiver has...
School Administrators' Leadership Impact: A View from the Field.
ERIC Educational Resources Information Center
Goldman, Paul; And Others
A survey of Oregon school administrators explored the relationships among demographic characteristics, school building and school district constraints, and leadership impact. Methodology involved a mailed survey of 420 administrators, which yielded 319 responses, or a 70 percent response rate, and in-depth personal interviews with 144 respondents.…
ERIC Educational Resources Information Center
American Association of School Administrators, Arlington, VA.
As an aid for school board members, this handbook offers advice on selecting central-office and building administrators. The introduction discusses the board's role in administrator selection, lists 16 areas in which board policies are needed, and suggests criteria and information needed for board policies. Chapter 1 reviews recent changes in the…
ERIC Educational Resources Information Center
Hardman, Elizabeth L.
2011-01-01
This paper examines the challenges inherent in building professional learning communities (PLCs) in special education and describes how two Web 2.0 tools were used to build a community that engages general and special education teachers, school administrators, and teacher educators in implementing research based inclusive practices that are known…
Building Early Learning Leaders: New Jersey's PreK-3rd Leadership Training. A Case Study
ERIC Educational Resources Information Center
Rice, Cynthia; Costanza, Vincent
2011-01-01
New Jersey school administrators are finding themselves in need of the supports necessary to build on the state's existing model preschools toward a broader vision of early learning, including making strong connections to the early learning system. Clearly, changing the educational mindset and building the related capacity of front-line leaders is…
9. Photographic copy of photograph (circa 1908, original print in ...
9. Photographic copy of photograph (circa 1908, original print in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois), Photographer unknown. OVERALL VIEW OF PRINTING AND ADVERTISING BUILDING, ADMINISTRATION BUILDING, AND MERCHANDISE BUILDING, VIEW TO WEST-SOUTHWEST - Sears Roebuck & Company Mail Order Plant, Bounded by Lexington & Grenshaw Streets, Kedzie Avenue & Independence Boulevard, Chicago, Cook County, IL
23 CFR 636.208 - May I use my existing prequalification procedures with design-build contracts?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false May I use my existing prequalification procedures with design-build contracts? 636.208 Section 636.208 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.208 May I use my existing...
23 CFR 636.210 - What requirements apply to projects which use the modified design-build procedure?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false What requirements apply to projects which use the modified design-build procedure? 636.210 Section 636.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.210 What requirements...
Tornado Protection: Selecting and Designing Safe Areas in Buildings.
ERIC Educational Resources Information Center
Abernethy, James J.
Tornadoes and extreme winds cause heavy loss of life and property damage throughout the United States. Most buildings offer significant protection from this danger, and building administrators should know the areas where this protection is available. This booklet presents a review of three schools, all of which were struck by tornadoes on April 3,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-23
... the FAA Memphis Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN 38118..., Memphis Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN 38118. In addition, a... Administration, Memphis Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN 38118. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
..., Tennessee 37167 and the FAA Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN..., Manager, Memphis Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN 38118. In... Administration, Memphis Airports District Office, 2862 Business Park Drive, Building G, Memphis, TN 38118. The...
Building a competent health manager at district level: a grounded theory study from Eastern Uganda.
Tetui, Moses; Hurtig, Anna-Karin; Ekirpa-Kiracho, Elizabeth; Kiwanuka, Suzanne N; Coe, Anna-Britt
2016-11-21
Health systems in low-income countries are often characterized by poor health outcomes. While many reasons have been advanced to explain the persistently poor outcomes, management of the system has been found to play a key role. According to a WHO framework, the management of health systems is central to its ability to deliver needed health services. In this study, we examined how district managers in a rural setting in Uganda perceived existing approaches to strengthening management so as to provide a pragmatic and synergistic model for improving management capacity building. Twenty-two interviews were conducted with district level administrative and political managers, district level health managers and health facility managers to understand their perceptions and definitions of management and capacity building. Kathy Charmaz's constructive approach to grounded theory informed the data analysis process. An interative, dynamic and complex model with three sub-process of building a competent health manager was developed. A competent manager was understood as one who knew his/her roles, was well informed and was empowered to execute management functions. Professionalizing health managers which was viewed as the foundation, the use of engaging learning approaches as the inside contents and having a supportive work environment the frame of the model were the sub-processes involved in the model. The sub-processes were interconnected although the respondents agreed that having a supportive work environment was more time and effort intensive relative to the other two sub-processes. The model developed in our study makes four central contributions to enhance the WHO framework and the existing literature. First, it emphasizes management capacity building as an iterative, dynamic and complex process rather than a set of characteristics of competent managers. Second, our model suggests the need for professionalization of health managers at different levels of the health system. Third, our model underscores the benefits that could be accrued from the use of engaging learning approaches through prolonged and sustained processes that act in synergy. Lastly, our model postulates that different resource investments and a varied range of stakeholders could be required at each of the sub-processes.
13. Interior view of food storage area looking towards hallway; ...
13. Interior view of food storage area looking towards hallway; southeast corner of building on lower floor; view to north. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
Presentation from the Federal Green Challenge Webinar Strategies for Energy/Water Conservation and Waste Diversion. Learn how the U.S. General Services Administration Region 2 program works to improve building performance.
4. CENTER COURTYARD, FROM WEST SIDE OF SOUTHEAST PORTION OF ...
4. CENTER COURTYARD, FROM WEST SIDE OF SOUTHEAST PORTION OF BUILDING, LOOKING WEST. - Oakland Naval Supply Center, Administration Building-Dental Annex-Dispensary, Between E & F Streets, East of Third Street, Oakland, Alameda County, CA
NAS infrastructure management system build 1.5 computer-human interface
DOT National Transportation Integrated Search
2001-01-01
Human factors engineers from the National Airspace System (NAS) Human Factors Branch (ACT-530) of the Federal Aviation Administration William J. Hughes Technical Center conducted an evaluation of the NAS Infrastructure Management System (NIMS) Build ...
Evaluating the effectiveness of student assistance programs in Pennsylvania.
Fertman, C I; Fichter, C; Schlesinger, J; Tarasevich, S; Wald, H; Zhang, X
2001-01-01
This article presents data from an evaluation of the Pennsylvania Student Assistance Program (SAP). Focusing on both program process and effectiveness, the evaluation was conducted to determine the overall efficacy of SAPs in Pennsylvania and, more specifically, how SAP is currently being implemented. Five data collection strategies were employed: statewide surveys of SAP team members and county administrators, focus groups, site visits, and the Pennsylvania Department of Education SAP Database. A total of 1204 individual team members from 154 school buildings completed the team member survey. Fifty-three county administrators completed the county administrator survey. Focus groups were comprised of SAP coordinators, school board personnel and community agency staff. Site visits were conducted at five schools. The findings of the evaluation indicate that SAP in Pennsylvania is being implemented as designed. Recommended is the development of benchmarks and indicators that focus on the best SAP practices and the extent to which various indicators of the effectiveness of SAP are occurring at appropriate levels.
29 CFR 1952.271 - Where the plan may be inspected.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Occupational Safety and Health Administration, U.S. Department of Labor, 200 Constitution Avenue, NW, Room... Administration, U.S. Department of Labor, John F. Kennedy Federal Building, Room E-340, Boston, Massachusetts...
29 CFR 1952.271 - Where the plan may be inspected.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Occupational Safety and Health Administration, U.S. Department of Labor, 200 Constitution Avenue, NW, Room... Administration, U.S. Department of Labor, John F. Kennedy Federal Building, Room E-340, Boston, Massachusetts...
8. View north from hallway, through administration area to front ...
8. View north from hallway, through administration area to front entrance. - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA
Brazilian Science and Research Integrity: Where are We? What Next?
Vasconcelos, Sonia M R; Sorenson, Martha M; Watanabe, Edson H; Foguel, Debora; Palácios, Marisa
2015-01-01
Building a world-class scientific community requires first-class ingredients at many different levels: funding, training, management, international collaborations, creativity, ethics, and an understanding of research integrity practices. All over the world, addressing these practices has been high on the science policy agenda of major research systems. Universities have a central role in fostering a culture of research integrity, which has posed additional challenges for faculty, students and administrators - but also opportunities. In Brazil, the leading universities and governmental funding agencies are collaborating on this project, but much remains to be done.
2011-01-20
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, James Wright, the deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett
Lublóy, Ágnes; Keresztúri, Judit Lilla; Benedek, Gábor
2017-10-01
Improving patient care coordination is critical for achieving better health outcome measures at reduced cost. However, assessing the results of patient care coordination at system level is lacking. In this report, based on administrative healthcare data, a provider-level care coordination measure is developed to assess the function of primary care at system level. In a sample of 31 070 patients with diabetes we find that the type of collaborative relationship general practitioners build up with specialists is associated with prescription drug costs. Regulating access to secondary care might result in cost savings through improved care coordination. © The Author 2017. Published by Oxford University Press on behalf of the European Public Health Association. All rights reserved.
Teacher Morale: What Builds It, What Kills It.
ERIC Educational Resources Information Center
Brodinsky, Ben
1984-01-01
Results of an American Association of School Administrators study indicate that professional autonomy, daily recognition, and involvement in decision making help build teacher morale. Suggestions for strengthening morale in the school environment and improving productivity are offerend. (DF)
OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING ...
OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING (FIRST-FLOOR CONCRETE PORTION) IN FOREGROUND. - U.S. Naval Base, Pearl Harbor, Combat Intelligence Center, Makalapa Drive in Makalapa Administration Area, Pearl City, Honolulu County, HI
5. SOUTHEAST CORNER AND COURTYARD OPENING, FROM F STREET SIDEWALK ...
5. SOUTHEAST CORNER AND COURTYARD OPENING, FROM F STREET SIDEWALK SOUTHEAST OF BUILDING, LOOKING NORTH-NORTHWEST. - Oakland Naval Supply Center, Administration Building-Dental Annex-Dispensary, Between E & F Streets, East of Third Street, Oakland, Alameda County, CA
6. NORTH SIDE, FROM APPROXIMATELY 25 FEET SOUTHEAST OF SOUTHWEST ...
6. NORTH SIDE, FROM APPROXIMATELY 25 FEET SOUTHEAST OF SOUTHWEST CORNER OF BUILDING 320, LOOKING SOUTH. - Oakland Naval Supply Center, Administration Building-Dental Annex-Dispensary, Between E & F Streets, East of Third Street, Oakland, Alameda County, CA
DETAIL OF BIVOUAC OF THE DEAD PLAQUES, SOUTH OF CHAPEL/ADMINISTRATION ...
DETAIL OF BIVOUAC OF THE DEAD PLAQUES, SOUTH OF CHAPEL/ADMINISTRATION BUILDING. VIEW TO NORTHEAST. - Los Angeles National Cemetery, 950 South Sepulveda Boulevard, Los Angeles, Los Angeles County, CA
ENTRANCE TO CEMETERY FROM VA MEDICAL CENTER CAMPUS, WITH ADMINISTRATION ...
ENTRANCE TO CEMETERY FROM VA MEDICAL CENTER CAMPUS, WITH ADMINISTRATION BUILDING IN BACKGROUND. VIEW TO NORTH. - Bath National Cemetery, Department of Veterans Affairs Medical Center, San Juan Avenue, Bath, Steuben County, NY
116. Photographic copy of drawing (25 June 1917, original drawing ...
116. Photographic copy of drawing (25 June 1917, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 131. 1/64 inch to one foot. Schematic plan of the Merchandise Building, describing the type of construction of the different portions of the building and shows the layout of the railroad tracks around the building. At the date of this drawing the building had all the major additons complete (to Annex A, Annex B, and the Box Factory). SCHETMATIC FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL
Waste processing building with incineration technology
NASA Astrophysics Data System (ADS)
Wasilah, Wasilah; Zaldi Suradin, Muh.
2017-12-01
In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.
Educational Administration and Queer Educators: Building Relationships of Inclusion and Diversity
ERIC Educational Resources Information Center
Callaghan, Tonya; Mizzi, Robert C.
2015-01-01
The editors of this special collection of the "Canadian Journal of Educational Administration and Policy" open this introductory essay with the words of Margaret Mead in order to underscore an important message contained in all of the essays of this collection: education administrators and policy makers are paramount to creating learning…
Shaw High School A Case Study in Rural High School Improvement
ERIC Educational Resources Information Center
Williams, Doris Terry
2004-01-01
Shaw High School is one of two schools making up the Shaw School District. The school is located in an old and once majestic building whose large concrete pillars still stand at the entrance. A small white house across the street holds the district administrative office. Several buildings, detached from the main building, house the cafeteria,…
12. Photographic copy of photograph (circa 1920's, original print in ...
12. Photographic copy of photograph (circa 1920's, original print in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois), Photographer unknown. OVERALL VIEW OF PRINTING AND ADVERTISING BUILDING, ADMINISTRATION BUILDING, AND MERCHANDISE BUILDING, VIEW TO SOUTHEAST - Sears Roebuck & Company Mail Order Plant, Bounded by Lexington & Grenshaw Streets, Kedzie Avenue & Independence Boulevard, Chicago, Cook County, IL
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false May contracting agencies use geographic preference in Federal-aid design-build or public-private partnership projects? 636.107 Section 636.107 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.107 May contractin...
Denver airport pumping systems achieve optimal [Delta] T's
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mannion, G.F.; Krist, G.D.
1994-07-01
This article describes how the pumping and generating systems at the new Denver Airport operate efficiently with the user loops in the buildings producing design temperature rise at all load levels. Fifteen miles east of Denver's Stapleton International Airport lies the newly completed Denver International Airport (DIA)--the world's largest and most high-tech airport. Besides being one of the largest construction projects in the works, it has many of the latest technical innovations available. Of particular interest to the HVAC industry is the design of the heating and cooling water systems. These systems provide environmental cooling and heating water to themore » three concourses, the airport office building, and the main terminal. The mechanical engineers for the project were all from the Denver area. The central plant design was the work of Behrent Engineering Co.; the three concourses were designed by Swanson-Rink Associates; and the main terminal and administrative office building were designed by Abeyta Engineering Consultants. The overall system concept was developed during the initial design phase by engineers from these firms, members of the DIA staff, and application engineers from several manufacturers.« less
DOT National Transportation Integrated Search
2013-04-01
The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...
11. Interior view of former mess hall; showing closed doorway ...
11. Interior view of former mess hall; showing closed doorway to former food storage; near northwest corner of building on main floor; view to east. - Ellsworth Air Force Base, Mess & Administration Building, 1561 Ellsworth Street, Blackhawk, Meade County, SD
OBLIQUE VIEW OF EAST (REAR) AND NORTH FACADES, WITH BUILDING ...
OBLIQUE VIEW OF EAST (REAR) AND NORTH FACADES, WITH BUILDING 792 VISIBLE IN BACKGROUND RIGHT, LOOKING WEST - Eglin Air Force Base, Storehouse & Company Administration, Southeast of Flager Road, Nassau Lane, & southern edge of Weekly Bayou, Valparaiso, Okaloosa County, FL
76 FR 2944 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... equipment. Rehabilitate airfield guidance signs. Rehabilitate runway 16/34 (design only). Rehabilitate parallel and connecting taxiways (design only). Rehabilitate terminal building. Conduct wildlife hazard assessment. Terminal building expansion (design only). PFC administrative costs. Reconstruct west aircraft...
2. NORTH AND WEST SIDES OF BUILDING 422. VIEW TO ...
2. NORTH AND WEST SIDES OF BUILDING 422. VIEW TO SOUTHEAST. - Rocky Mountain Arsenal, Administration-Laboratory- Change House-Bomb Rail, 420 feet South of December Seventh Avenue; 530 feet West of D Street, Commerce City, Adams County, CO
1. SOUTH AND EAST SIDES OF BUILDING 422. VIEW TO ...
1. SOUTH AND EAST SIDES OF BUILDING 422. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Administration-Laboratory- Change House-Bomb Rail, 420 feet South of December Seventh Avenue; 530 feet West of D Street, Commerce City, Adams County, CO
9. NORTH FLANK AND (WEST) REAR WITH REAR OF ADMINISTRATION ...
9. NORTH FLANK AND (WEST) REAR WITH REAR OF ADMINISTRATION BUILDING, LOOKING SOUTHEAST ACROSS GARDEN FROM TOWER GROVE SOUTH PORCH - Missouri Botanical Garden, Henry Shaw Townhouse, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO
Code of Federal Regulations, 2010 CFR
2010-04-01
...' Benefits SOCIAL SECURITY ADMINISTRATION TESTIMONY BY EMPLOYEES AND THE PRODUCTION OF RECORDS AND... Security Administration, 300 Altmeyer Building, 6401 Security Blvd., Baltimore, MD 21235-6401. ...