Science.gov

Sample records for bus evaluation interim

  1. Test Bus Evaluation

    DTIC Science & Technology

    1998-04-01

    4.2.2-1. F-22 Vehicle Management System Architecture This discussion will concentrate on the Processor Interface Control and Communications ( PICC ...module which is used in multiple locations in the F-22 avionics. The PICC module is based on a MIL-STD-1750A processor and supporting chip set. External...differential discrete I/O signals. Each of the PICC ASICs implement the IEEE 1149.1 test bus which is routed to the module connector. 4-12 The

  2. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. Link to an amendment published at 76 FR 57936, September 19, 2011. (a) Private entities operating over-the-road buses,...

  3. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this...

  4. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    SciTech Connect

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  5. Systems evaluation of thermal bus concepts

    NASA Technical Reports Server (NTRS)

    Stalmach, D. D.

    1982-01-01

    Thermal bus concepts, to provide a centralized thermal utility for large, multihundred kilowatt space platforms, were studied and the results are summarized. Concepts were generated, defined, and screened for inclusion in system level thermal bus trades. Parametric trade studies were conducted in order to define the operational envelope, performance, and physical characteristics of each. Two concepts were selected as offering the most promise for thermal bus development. All of four concepts involved two phase flow in order to meet the required isothermal nature of the thermal bus. Two of the concepts employ a mechanical means to circulate the working fluid, a liquid pump in one case and a vapor compressor in another. Another concept utilizes direct osmosis as the driving force of the thermal bus. The fourth concept was a high capacity monogroove heat pipe. After preliminary sizing and screening, three of these concepts were selected to carry into the trade studies. The monogroove heat pipe concept was deemed unsuitable for further consideration because of its heat transport limitations. One additional concept utilizing capillary forces to drive the working fluid was added. Parametric system level trade studies were performed. Sizing and weight calculations were performed for thermal bus sizes ranging from 5 to 350 kW and operating temperatures in the range of 4 to 120 C. System level considerations such as heat rejection and electrical power penalties and interface temperature losses were included in the weight calculations.

  6. The EMEFS model evaluation. An interim report

    SciTech Connect

    Barchet, W.R.; Dennis, R.L.; Seilkop, S.K.; Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K.; Byun, D.; McHenry, J.N.; Karamchandani, P.; Venkatram, A.; Fung, C.; Misra, P.K.; Hansen, D.A.; Chang, J.S.

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  7. American Fuel Cell Bus Project Evaluation. Second Report

    SciTech Connect

    Eudy, Leslie; Post, Matthew

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  8. BC Transit Fuel Cell Bus Project: Evaluation Results Report

    SciTech Connect

    Eudy, L.; Post, M.

    2014-02-01

    This report evaluates a fuel cell electric bus demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. This evaluation report covers two years of revenue service data on the buses from April 2011 through March 2013.

  9. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  10. Safety evaluation of a hydrogen fueled transit bus

    SciTech Connect

    Coutts, D.A.; Thomas, J.K.; Hovis, G.L.; Wu, T.T.

    1997-12-31

    Hydrogen fueled vehicle demonstration projects must satisfy management and regulator safety expectations. This is often accomplished using hazard and safety analyses. Such an analysis has been completed to evaluate the safety of the H2Fuel bus to be operated in Augusta, Georgia. The evaluation methods and criteria used reflect the Department of Energy`s graded approach for qualifying and documenting nuclear and chemical facility safety. The work focused on the storage and distribution of hydrogen as the bus motor fuel with emphases on the technical and operational aspects of using metal hydride beds to store hydrogen. The safety evaluation demonstrated that the operation of the H2Fuel bus represents a moderate risk. This is the same risk level determined for operation of conventionally powered transit buses in the United States. By the same criteria, private passenger automobile travel in the United States is considered a high risk. The evaluation also identified several design and operational modifications that resulted in improved safety, operability, and reliability. The hazard assessment methodology used in this project has widespread applicability to other innovative operations and systems, and the techniques can serve as a template for other similar projects.

  11. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  12. BC Transit Fuel Cell Bus Project Evaluation Results: Second Report

    SciTech Connect

    Eudy, L.; Post, M.

    2014-09-01

    Second report evaluating a fuel cell electric bus (FCEB) demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. NREL published its first report on the demonstration in February 2014. This report is an update to the previous report; it covers 3 full years of revenue service data on the buses from April 2011 through March 2014 and focuses on the final experiences and lessons learned.

  13. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: First Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-03-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This report provides the early data results and implementation experience of the AT fuel cell bus since it was placed in service.

  14. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report

    SciTech Connect

    Eudy, L.; Chandler, K.

    2013-01-01

    SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

  15. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Third Results Reports

    SciTech Connect

    Eudy, L.; Chandler, K.

    2012-05-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. NREL has previously published two reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from July 2011 through January 2012.

  16. BC Transit Fuel Cell Bus Project: Evaluation Results Report

    National Renewable Energy Laboratory (NREL)

    ... Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Miles Kilometers Bus Propulsion System FC System FC System MBRC 2016 Target Bus MBRC 2016 Target ...

  17. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Second Results Report and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2011-10-01

    This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This is the second results report for the AT fuel cell bus since it was placed in service, and it focuses on the newest data analysis and lessons learned since the previous report. The appendices, referenced in the main report, provide the full background for the evaluation. They will be updated as new information is collected but will contain the original background material from the first report.

  18. Reading First Implementation Evaluation: Interim Report

    ERIC Educational Resources Information Center

    Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer

    2006-01-01

    In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…

  19. An evaluation of a lane support system for bus rapid transit on narrow shoulders and the relation to bus driver mental workload.

    PubMed

    Ward, Nicholas J; Shankwitz, Craig; Gorgestani, Alec; Donath, Max; De Waard, Dick; Boer, Erwin R

    2006-07-15

    The use of dedicated bus shoulders is a key method for implementing bus rapid transit (BRT) in areas that do not have the space for additional infrastructure. However, the narrow width of the bus shoulder and the need to anticipate traffic hazards in the adjacent lane can both be significant stressors for bus drivers. Bus driver mental workload and stress in response to these conditions should be a significant concern both for operational safety and driver health. This pilot study evaluated the potential stressors of traffic density and shoulder width in the context of an express BRT service in a large US metropolitan area. In addition, the study considered the potential role of a prototype lane support system (LSS) to support vehicle control within the narrow shoulder boundaries. Ten experienced bus drivers drove an actual route with an instrumented bus equipped with and without LSS. Self-reported effort was recorded along with performance measures of speed and position control relevant to mobility and safety objectives. Bus drivers did note stressors in the BRT environment and the prototype LSS. However, the use of the shoulder during high-density traffic conditions did improve mobility. Moreover, the LSS did enhance safety on the shoulder when there was high-density traffic in the adjacent lane. However, there was no evidence that the LSS reduced bus driver workload while operating in the narrow shoulder. Future research should consider the impact of BRT operations and support systems on bus driver mental workload and stress, and support the deployment of such devices for bus operations on shoulders during high traffic volumes.

  20. A bus stop shelter evaluated from the user's perspective.

    PubMed

    Ely, Vera Helena Moro Bins; de Oliveira, Jonara Machado; Logsdon, Louise

    2012-01-01

    This study aims to evaluate the current bus stop shelter model used in Florianópolis, Brazil, through a functional analysis--focused in the relationship between the shelter, the users and their activities--and also to analyse users' perceptions. The methodology consisted of exploratory visits, anthropometric analysis, observation and interviews. The exploratory visit intended to survey the physical characteristics of the shelter (dimensions, materials, colors, displayed information) and its position on the sidewalk. The anthropometric analysis was made to verify whether the dimensions of the shelters were adequate to users' needs. The observation provided data for the analysis of users' behavior, which involved a biomechanical study of their postures, an ownership/occupancy analysis in terms of territoriality and studies about spatial requirements of interpersonal relations (proxemics). The interviews helped to analyze how the user perceives the quality of some of the main functions of the shelter: to provide physical and psychological comfort and to display information about the public transportation system. As a result, the overall conclusion is that shelters do not meet users' needs. Recommendations are provided in order to improve physical and psychological comfort and to display relevant information about the transportation system.

  1. Performance evaluation of the JPL interim digital SAR processor

    NASA Technical Reports Server (NTRS)

    Wu, C.; Barkan, B.; Curlander, J.; Jin, M.; Pang, S.

    1983-01-01

    The performance of the Interim Digital SAR Processor (IDP) was evaluated. The IDP processor was originally developed for experimental processing of digital SEASAT SAR data. One phase of the system upgrade which features parallel processing in three peripheral array processors, automated estimation for Doppler parameters, and unsupervised image pixel location determination and registration was executed. The method to compensate for the target range curvature effect was improved. A four point interpolation scheme is implemented to replace the nearest neighbor scheme used in the original IDP. The processor still maintains its fast throughput speed. The current performance and capability of the processing modes now available on the IDP system are updated.

  2. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  3. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Third Evaluation Report and Appendices

    SciTech Connect

    Chandler, K.; Eudy, L.

    2010-01-01

    This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The prototype fuel cell bus was manufactured by Van Hool and ISE Corp. and features an electric hybrid drive system with a UTC Power PureMotion 120 Fuel Cell Power System and ZEBRA batteries for energy storage. The fuel cell bus started operation in April 2007, and evaluation results through October 2009 are provided in this report.

  4. Annoyance evaluation and the effect of noise on the health of bus drivers.

    PubMed

    Bruno, Portela S; Marcos, Queiroga R; Amanda, Constantini; Paulo, Zannin H T

    2013-01-01

    In the present study, we evaluated annoyance and the effects of noise on the health of bus drivers. For that, 200 bus drivers from a public transport company participated in a cross-sectional study. Annoyance and effects on health was measured with analog scale: Sleep quality, occurrence of tinnitus, headache, irritation, and annoyance from bus engine, traffic, and passengers. Data of age and working time of bus drivers also were obtained. For noise exposure, LA eq was evaluated in 80 buses. Statistical analysis consisted of mean, standard deviation, minimum, and maximum, Kruskal-Wallis test with post-hoc Dunn, one-way ANOVA with post-hoc Tukey and Spearman's correlation coefficient. Results indicate three groups of bus drivers (not annoyed: (N.A.), a little annoyed (L.A.) and highly annoyed (H.A.)). The group H.A. was younger and with less working time in relation to others, with a significant difference only for age. Regarding sleep quality, there was no significant difference. For results on the occurrence of tinnitus, headache and irritation after work, group H.A. had significantly higher means. Result of annoyance to the bus engine was significantly higher in H.A. than in L.A. and N.A. Annoyance to traffic and passengers, no significant differences were found, but the highest results were found for L.A., followed by H.A. and N.A. Equivalent sound pressure level in buses was above of the limit for occupational comfort. It was concluded that bus drivers has considerable level of noise annoyance and some health effects are perceived. The noise is a factor discomfort ergonomic that may cause effects on health of bus drivers. This study aims to evaluate annoyance and the effects of noise on the health of bus drivers. Cross-sectional study with buses and bus drivers. For that, 200 bus drivers from a public transport company participated in a cross-sectional study. Annoyance and effects on health was measured with analog scale: Sleep quality, occurrence of tinnitus

  5. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    SciTech Connect

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  6. An evaluation plan of bus architectures and protocols using the NASA Ames intelligent redundant actuation system

    NASA Technical Reports Server (NTRS)

    Defeo, P.; Chen, M.

    1987-01-01

    Means for evaluating data bus architectures and protocols for highly integrated flight control system applications are needed. Described are the criteria and plans to do this by using the NASA/Ames Intelligent Redundant Actuation System (IRAS) experimental set-up. Candidate bus architectures differ from one another in terms of: topology, access control, message transfer schemes, message characteristics, initialization. data flow control, transmission rates, fault tolerance, and time synchronization. The evaluation criteria are developed relative to these features. A preliminary, analytical evaluation of four candidate busses (MIL-STD-1553B, DATAC, Ethernet, and HSIS) is described. A bus must be exercised in a real-time environment to evaluate its dynamic characteristics. A plan for real-time evaluation of these four busses using a combination of hardware and simulation techniques is presented.

  7. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  8. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  9. Evaluation and Research Center for Project Head Start, University of South Carolina. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Friedman, Myles I.

    This document is an interim evaluation report of language development curriculums in full year Head Start programs operating in the five state area the Research and Evaluation Center serves. One experimental study in language development carried on in cooperation with the Texas and Tulane centers is reported in depth. The study was implemented in…

  10. 76 FR 58846 - Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety.... Nuclear Regulatory Commission (NRC) staff is issuing its Final Interim Staff Guidance (ISG)...

  11. SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report (Report and Appendices)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2009-08-01

    This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it describes results and experiences from October 2008 through June 2009. These results are an addition to those provided in the previous four evaluation reports.

  12. SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report (Report and Appendices)

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-01-01

    This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five new compressed natural gas (CNG) buses. This is the fourth evaluation report for this site, and it describes results and experiences from April 2008 through October 2008. These results are an addition to those provided in the previous three evaluation reports.

  13. A new vehicle data bus architecture and IVIS evaluation platform for ITS modulus

    SciTech Connect

    Spelt, P.F.; Kirson, A.M.; Scott, S.

    1998-12-31

    An increasing number of ITS-related after-market systems present a set of in-vehicle installation and use problems relatively unique in the history of automobile use. Many automobile manufacturers would like to offer these new state of the art devices to customers, but are hampered by the current design cycle of new cars. While auto manufacturers are indeed using multiplex buses (the automotive equivalent of a computer local area network), problems remain because manufacturers are not converging on a single bus standard. This paper presents a new dual-bus architecture to address these problems, with an In-Vehicle Information System (IVIS) research platform on which the principles embodied in the ITS Data Bus architecture can be evaluated. The dual-bus architecture has been embodied in a proposed SAE standard, with a ratification vote in December, 1996. The architecture and a reference model for the interfaces and protocols of the new bus are presented and described. The goals of the ITS Data Bus are to be inexpensive and easy to install, and to provide for safe and secure functioning. These high-level goals are embodied in the proposed standard. The IVIS Development Platform comprises a number of personal computers linked via ethernet LAN, with a high-end PC serving as the IVIS computer. In this LAN, actual devices can be inserted in place of the original PC which emulated them. This platform will serve as the development and test bed for an ITS Data Bus Conformity Test, the SAE standard for which has also been developed.

  14. Pilot evaluation of a walking school bus program in a low-income, urban community

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Our objective was to evaluate the impact of a walking school bus (WSB) program on student transport in a low-income, urban neighborhood. The design was a controlled, quasi-experimental trial with consecutive cross-sectional assessments. The setting was three urban, socioeconomically disadvantaged, p...

  15. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second Evaluation Report and Appendices

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-05-01

    This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The evaluation period in this report (January 2008 through February 2009) has been chosen to coincide with a UTC Power propulsion system changeout that occurred on January 15, 2008.

  16. Pilot Evaluation of a Walking School Bus Program in a Low-Income Urban Community

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To evaluate the impact of a walking school bus (WSB) program on the proportion of students walking to school in a low-income, urban neighborhood, we conducted a controlled, quasi-experimental trial in urban, socioeconomically disadvantaged, public elementary schools (one intervention and two control...

  17. Home Start Evaluation Study. Interim Report III: Summative Evaluation Results.

    ERIC Educational Resources Information Center

    Deloria, Dennis; And Others

    This report presents data collected in six of the 16 Home Start sites in operation in the spring of 1973. The major task of the pilot summative evaluation was to try out the measurement battery so necessary modifications could be completed before beginning the actual evaluation in fall 1973. Another purpose was to train a capable field staff and…

  18. Performance Evaluation of UHF RFID Technologies for Real-Time Bus Recognition in the Taipei Bus Station

    PubMed Central

    Own, Chung-Ming; Lee, Da-Sheng; Wang, Ti-Ho; Wang, De-Jun; Ting, Yu-Lun

    2013-01-01

    Transport stations such as airports, ports, and railways have adopted blocked-type pathway management to process and control travel systems in a one-directional manner. However, this excludes highway transportation where large buses have great variability and mobility; thus, an instant influx of numerous buses increases risks and complicates station management. Focusing on Taipei Bus Station, this study employed RFID technology to develop a system platform integrated with modern information technology that has numerous characteristics. This modern information technology comprised the following systems: ultra-high frequency (UHF) radio-frequency identification (RFID), ultrasound and license number identification, and backstage graphic controls. In conclusion, the system enabled management, bus companies, and passengers to experience the national bus station's new generation technology, which provides diverse information and synchronization functions. Furthermore, this technology reached a new milestone in the energy-saving and efficiency-increasing performance of Taiwan's buses. PMID:23778192

  19. Performance evaluation of UHF RFID technologies for real-time bus recognition in the Taipei Bus Station.

    PubMed

    Own, Chung-Ming; Lee, Da-Sheng; Wang, Ti-Ho; Wang, De-Jun; Ting, Yu-Lun

    2013-06-18

    Transport stations such as airports, ports, and railways have adopted blocked-type pathway management to process and control travel systems in a one-directional manner. However, this excludes highway transportation where large buses have great variability and mobility; thus, an instant influx of numerous buses increases risks and complicates station management. Focusing on Taipei Bus Station, this study employed RFID technology to develop a system platform integrated with modern information technology that has numerous characteristics. This modern information technology comprised the following systems: ultra-high frequency (UHF) radio-frequency identification (RFID), ultrasound and license number identification, and backstage graphic controls. In conclusion, the system enabled management, bus companies, and passengers to experience the national bus station's new generation technology, which provides diverse information and synchronization functions. Furthermore, this technology reached a new milestone in the energy-saving and efficiency-increasing performance of Taiwan's buses.

  20. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

    SciTech Connect

    Chandler, K.; Eudy, L.

    2009-01-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

  1. St. Louis Metro Biodiesel (B20) Transit Bus Evaluation: 12-Month Final Report

    SciTech Connect

    Barnitt, R.; McCormick, R. L.; Lammert, M.

    2008-07-01

    The St. Louis Metro Bodiesel Transit Bus Evaluation project is being conducted under a Cooperative Research and Development Agreement between NREL and the National Biodiesel Board to evaluate the extended in-use performance of buses operating on B20 fuel. The objective of this research project is to compare B20 and ultra-low sulfur diesel buses in terms of fuel economy, veicles maintenance, engine performance, component wear, and lube oil performance.

  2. Accessible bus service in St. Louis. Final report. UMTA/TSC project evaluation series

    SciTech Connect

    Teixeira, D.; Varker, F.; Bowlin, R.

    1980-02-01

    The Bi-State Development Agency in St. Louis began operating buses equipped with hydraulic lifts for boarding persons in wheelchairs in August of 1977. This was the first large scale accessible bus project in transit history. One hundred fifty-seven lift equipped buses were put into revenue service over a three and one-half month period. Seventeen routes were selected for accessible bus service. In September of 1978, scheduled accessible service was cut back by two-thirds due to malfunctions of the lift equipment. Wheelchair user ridership decreased gradually during the first year of service but dropped off markedly during the last ten months of the evaluation period. The evaluation covered the development planning, the implementation process, operations, service and equipment reliability, travel behavior, productivity, economics, and service impacts. The results of the St. Louis accessible service which have important implications for other operators are also discussed.

  3. Update from the NREL Alternative Fuel Transit Bus Evaluation Program

    SciTech Connect

    Chandler, K.; Norton, P.; Clark, N.

    1999-05-01

    The object of this project, which is supported by the U.S. Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL), is to provide a comprehensive comparison of heavy-duty urban transit buses operating on alternative fuels and diesel fuel. Final reports from this project were produced in 1996 from data collection and evaluation of 11 transit buses from eight transit sites. With the publication of these final reports, three issues were raised that needed further investigation: (1) the natural gas engines studied were older, open-loop control engines; (2) propane was not included in the original study; and (3) liquefied natural gas (LNG) was found to be in the early stages of deployment in transit applications. In response to these three issues, the project has continued by emissions testing newer natural gas engines and adding two new data collection sites to study the newer natural gas technology and specifically to measure new technology LNG buses.

  4. Research development and demonstration of a fuel cell/battery powered bus system. Interim report, August 1, 1991--April 30, 1992

    SciTech Connect

    Romano, S.; Wimmer, R.

    1992-04-30

    This report describes the progress in the Georgetown University research, development and demonstration project of a fuel cell/battery powered bus system. The topics addressed in the report include vehicle design and application analysis, technology transfer activities, coordination and monitoring of system design and integration contractor, application of fuel cells to other vehicles, current problems, work planned, and manpower, cost and schedule reports.

  5. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…

  6. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    ERIC Educational Resources Information Center

    D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin

    In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…

  7. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation. [Executive Summary

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…

  8. National Home Start Evaluation Interim Report VI. Executive Summary: Findings and Recommendations.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is an executive summary of the interim report on National Home Start Evaluation. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her own children and to provide comprehensive social-emotional,…

  9. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  10. Fast Charge Battery Electric Transit Bus In-Use Fleet Evaluation

    SciTech Connect

    Prohaska, Robert; Kelly, Kenneth; Eudy, Leslie

    2016-07-25

    The focus of this interim fleet evaluation is to characterize and evaluate the operating behavior of Foothill Transit's fast charge battery electric buses (BEBs). Future research will compare the BEBs' performance to conventional vehicles. In an effort to better understand the impacts of drive cycle characteristics on advanced vehicle technologies, researchers at the National Renewable Energy Laboratory analyzed over 148,000 km of in-use operational data, including driving and charging events. This analysis provides an unbiased evaluation of advanced vehicle technologies in real-world operation demonstrating the importance of understanding the effects of road grade and heating, ventilating and air conditioning requirements when deploying electric vehicles. The results of this analysis show that the Proterra BE35 demonstrated an operating energy efficiency of 1.34 kWh/km over the data reporting period.

  11. Fast Charge Battery Electric Transit Bus In-Use Fleet Evaluation: Preprint

    SciTech Connect

    Prohaska, Robert; Eudy, Leslie; Kelly, Kenneth

    2016-05-06

    The focus of this interim fleet evaluation is to characterize and evaluate the operating behavior of Foothill Transit's fast charge battery electric buses (BEBs). Future research will compare the BEBs' performance to conventional vehicles. In an effort to better understand the impacts of drive cycle characteristics on advanced vehicle technologies, researchers at the National Renewable Energy Laboratory analyzed over 148,000 km of in-use operational data, including driving and charging events. This analysis provides an unbiased evaluation of advanced vehicle technologies in real-world operation demonstrating the importance of understanding the effects of road grade and heating, ventilating and air conditioning requirements when deploying electric vehicles. The results of this analysis show that the Proterra BE35 demonstrated an operating energy efficiency of 1.34 kWh/km over the data reporting period.

  12. Hydrogen and Fuel Cell Transit Bus Evaluations: Joint Evaluation Plan for the U.S. Department of Energy and the Federal Transit Administration (Report and Appendix)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2008-05-01

    This document describes the hydrogen transit bus evaluations performed by the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) and the U.S. Department of Transportation's Federal Transit Administration (FTA).

  13. Fuel Cell Transit Bus Evaluations: Joint Evaluation Plan for the U.S. Department of Energy and the Federal Transit Administration (Report and Appendix)

    SciTech Connect

    Eudy, L.; Chandler, K.

    2010-11-01

    This document describes the fuel cell transit bus evaluations performed by the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) and the U.S. Department of Transportation's Federal Transit Administration (FTA). This document provides a description of the demonstration sites, funding sources, and data collection activities for fuel cell transit bus evaluations currently planned from FY10 through FY12.

  14. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    SciTech Connect

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  15. Weatherization Works: An interim report of the National Weatherization Evaluation

    SciTech Connect

    Brown, M.A.; Berry, L.G.; Kinney, L.F.

    1993-11-01

    The National Weatherization Evaluation is the first comprehensive evaluation of the Weatherization Assistance Program since 1984. The evaluation was designed to accomplish the following goals: Estimate energy savings and cost effectiveness; Assess nonenergy impacts; Describe the weatherization network; Characterize the eligible population and resources; and Identify factors influencing outcomes and opportunities for the future. As a national program, weatherization incorporates considerable diversity due to regional differences. Therefore, evaluation results are presented both in aggregate and for three climate regions: cold, moderate and hot.

  16. Interim report on nodel evaluation methodology and the evaluation of LEAP

    SciTech Connect

    Alsmiller, R.G. Jr.; Barish, J.; Bjornstad, D.

    1980-04-01

    This report describes progress made at ORNL toward development and demonstration of a methodology for evaluating energy-economic modeling codes and important results derived from these codes. To bolster traditional evaluation methods with more-quantitative procedures of interest to the Energy Information Administration, ORNL is applying sensitivity theory as part of a comprehensive effort to quantify the importance of various data and model parameters to the key results that are of interest. The Long-Term Energy Analysis Program (LEAP) was chosen as the initial focus for the research. LEAP is an energy-economy model which resides in the Long-Term Energy Analysis Division (LTEAD) of the Integrative Analysis Group in the Office of Applied Analysis, EIA. LTEAD developed Model 22C of LEAP for two reasons: (1) to prepare projections through the year 2020, which were needed for the 1978 EIA Annual Report to Congress and (2) to develop a base for analyses of specific options for Federal action. LEAP Model 22C and its uses are described to provide the background for this interim description of the model evaluation effort at ORNL. 19 figures, 10 tables.

  17. Evaluation of In Harmony: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Lord, Pippa; Sharp, Caroline; Dawson, Anneka; Mehta, Palak; White, Richard; Jeffes, Jennifer

    2013-01-01

    Arts Council England (ACE) commissioned NFER to undertake the national evaluation of the In Harmony social and music education programme 2012-2015. In Harmony is funded by the Department for Education (DfE) and ACE, and is currently being piloted in six areas. The evaluation is investigating the range and extent of impacts on children, families,…

  18. Interim Principals.

    ERIC Educational Resources Information Center

    Beem, Kate

    2003-01-01

    An interim principal can buy a school district time to land a permanent successor. Also lists where to find an interim principal; the interim's steadying influence; Bob Wallace's wild ride as an interim principal in post-retirement; and Roger Prosise's rationale for turning to an interim appointment. (MLF)

  19. STARPAHC Interim Evaluation Report, May 1975 - April 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The primary goals of the STARPAHC Program are to provide data for developing health care for future manned spacecraft, and to establish the feasibility of the STARPAHC concept for improving the delivery of health care to remote areas on earth. Accordingly, the hardware and medical evaluations initiated during the first 6 months of system operation were continued and expanded during the second 6-month period. The evaluations are based on what has proven to be a relatively stabilized 6-month period wherein system failures which occurred during the initial shakedown period in the first 6 months have been minimized. Early trends and performance data reported in the first semi-annual report were reexamined to either verify, modify or change earlier conclusions. The highlights are given of the total year of operation with emphasis on comparisons between the first and second semi-annual reporting period. In addition, an early analysis of costs is summarized.

  20. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2001-03-23

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  1. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report #2, Alameda-Contra Costa Transit District (AC Transit) and Appendices

    SciTech Connect

    Eudy, L.; Chandler, K.

    2010-06-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.

  2. Comprehensive computerized medical imaging: interim hypothetical economic evaluation

    NASA Astrophysics Data System (ADS)

    Warburton, Rebecca N.; Fisher, Paul D.; Nosil, Josip

    1990-08-01

    The 422-bed Victoria General Hospital (VGH) and Siemens Electric Limited have since 1983 been piloting the implementation of comprehensive computerized medical imaging, including digital acquisition of diagnostic images, in British Columbia. Although full PACS is not yet in place at VGH, experience to date habeen used to project annual cost figures (including capital replacement) for a fully-computerized department. The resulting economic evaluation has been labelled hypothetical to emphasize that some key cost components were estimated rather than observed; this paper presents updated cost figures based on recent revisions to proposed departmental equipment configuration which raised the cost of conventional imaging equipment by 0.3 million* and lowered the cost of computerized imaging equipment by 0.8 million. Compared with conventional diagnostic imaging, computerized imaging appears to raise overall annual costs at VGH by nearly 0.7 million, or 11.6%; this is more favourable than the previous results, which indicated extra annual costs of 1 million (16.9%). Sensitivity analysis still indicates that all reasonable changes in the underlying assumptions result in higher costs for computerized imaging than for conventional imaging. Computerized imaging offers lower radiation exposure to patients, shorter waiting times, and other potential advantages, but as yet the price of obtaining these benefits remains substantial.

  3. Pilot evaluation of a walking school bus program in a low-income, urban community

    PubMed Central

    Mendoza, Jason A; Levinger, David D; Johnston, Brian D

    2009-01-01

    Background To evaluate the impact of a walking school bus (WSB) program on student transport in a low-income, urban neighborhood. Methods The design was a controlled, quasi-experimental trial with consecutive cross-sectional assessments. The setting was three urban, socioeconomically disadvantaged, public elementary schools (1 intervention vs. 2 controls) in Seattle, Washington, USA. Participants were ethnically diverse students in kindergarten-5th grade (aged 5–11 years). The intervention was a WSB program consisting of a part-time WSB coordinator and parent volunteers. Students' method of transportation to school was assessed by a classroom survey at baseline and one-year follow-up. The Pearson Chi-squared test compared students transported to school at the intervention versus control schools at each time point. Due to multiple testing, we calculated adjusted p-values using the Ryan-Holm stepdown Bonferroni procedure. McNemar's test was used to examine the change from baseline to 12-month follow-up for walking versus all other forms of school transport at the intervention or control schools. Results At baseline, the proportions of students (n = 653) walking to the intervention (20% +/- 2%) or control schools (15% +/- 2%) did not differ (p = 0.39). At 12-month follow up, higher proportions of students (n = 643, p = 0.001)) walked to the intervention (25% +/- 2%) versus the control schools (7% +/- 1%). No significant changes were noted in the proportion of students riding in a car or taking the school bus at baseline or 12-month follow up (all p > 0.05). Comparing baseline to 12-month follow up, the numbers of students who walked to the intervention school increased while the numbers of students who used the other forms of transport did not change (p < 0.0001). In contrast, the numbers of students who walked to the control schools decreased while the numbers of students who used the other forms of transport did not change (p < 0.0001). Conclusion A WSB program is

  4. Orbiter multiplexer-demultiplexer (MDM)/Space Lab Bus Interface Unit (SL/BIU) serial data interface evaluation, volume 2

    NASA Technical Reports Server (NTRS)

    Tobey, G. L.

    1978-01-01

    Tests were performed to evaluate the operating characteristics of the interface between the Space Lab Bus Interface Unit (SL/BIU) and the Orbiter Multiplexer-Demultiplexer (MDM) serial data input-output (SIO) module. This volume contains the test equipment preparation procedures and a detailed description of the Nova/Input Output Processor Simulator (IOPS) software used during the data transfer tests to determine word error rates (WER).

  5. Interim radiological safety standards and evaluation procedures for subseabed high-level waste disposal

    SciTech Connect

    Klett, R.D.

    1997-06-01

    The Seabed Disposal Project (SDP) was evaluating the technical feasibility of high-level nuclear waste disposal in deep ocean sediments. Working standards were needed for risk assessments, evaluation of alternative designs, sensitivity studies, and conceptual design guidelines. This report completes a three part program to develop radiological standards for the feasibility phase of the SDP. The characteristics of subseabed disposal and how they affect the selection of standards are discussed. General radiological protection standards are reviewed, along with some new methods, and a systematic approach to developing standards is presented. The selected interim radiological standards for the SDP and the reasons for their selection are given. These standards have no legal or regulatory status and will be replaced or modified by regulatory agencies if subseabed disposal is implemented. 56 refs., 29 figs., 15 tabs.

  6. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20... that existing guidance does not sufficiently detail how the NRC staff reviews surveys of radon...

  7. Cost Sensitivity Analysis for Consolidated Interim Storage of Spent Fuel: Evaluating the Effect of Economic Environment Parameters

    SciTech Connect

    Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.; Joseph, III, Robert Anthony

    2016-12-01

    This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.

  8. Analysis of the Cordex evaluation runs (ERA_Interim) over Southern Africa

    NASA Astrophysics Data System (ADS)

    Lennard, Chris; Kalognoumou, Liana

    2013-04-01

    The CORDEX program was instituted by the World Climate Research Program (WCRP) to develop downscaled regional climate change projections at user-relevant scales for all terrestrial regions of the world. Africa was identified as the priority domain in urgent need of attention. In light of this the Cordex-Africa Analysis campaign was initiated as a co-ordinated effort to analyse the available Era-Interim downscalings. Three regional African groups were formed (West Africa, East Africa and Southern Africa) and experts from each region tasked with the assessment of the available downscaled data. Within Africa, CORDEX has come to be viewed by many in the decision making community as the leading source of new climate change information, and expectations are high. This paper presents the analysis performed by the southern African team in which the ability of ten regional climate models (RCMs) to simulate precipitation over southern Africa within the Cordex framework was evaluated. An ensemble of ten regional climate simulations and the ensemble average is analysed to evaluate the model's ability to reproduce seasonal and interannual rainfall characteristics over regions of the sub-continent. All the RCMs use the Cordex African domain, have a spatial resolution of ~50km and are driven by the ERA-Interim reanalysis (1989- 2008). Results are compared against a number of observational datasets such as the GPCC, CRU, UDEL, TRMM etc. The spatial and temporal nature of rainfall over the Southern African region is captured by all RCMs, however, individual models exhibit wet or dry biases over particular regions of the domain. Models generally produce lower seasonal variability of precipitation compared to observations and the magnitude of the variability varies in space and time. Model biases are related to the positioning of the ITCZ as well as moisture transport. The multi-model ensemble mean generally out-performs individual models, with bias magnitudes similar to differences

  9. Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report

    SciTech Connect

    Ayers, C.W.

    2004-11-23

    Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  10. Evaluation of flexural strength of resin interim restorations impregnated with various types of silane treated and untreated glass fibres

    PubMed Central

    Naveen, K.S.; Singh, J.P.; Viswambaran, M.; Dhiman, R.K.

    2015-01-01

    Background Flexural strength is an important mechanical property that determines the long-term prognosis of interim restorations. Studies are lacking regarding the effect of silanation of the various types of glass fibre impregnation on the flexural strength of resin interim restorations. Methods A customized metal die was milled to simulate the prepared abutments of a three-unit fixed dental prosthesis. A total of seventy five samples of interim fixed dental prostheses were prepared using autopolymerizing tooth colour acrylic resin. Unidirectional and woven forms of glass fibres (Stick and Stick Net), which were silane treated and untreated were used to reinforce the resin matrix. Fifteen samples were prepared for each group along with unreinforced group serving as control. The flexural strength was evaluated with universal testing machine. Results The means and standard deviations of flexural strength for different groups were 13.90 ± 2.96 (control), 61.58 ± 5.26 (unidirectional fibres), 30.89 ± 3.60 (woven fibres), 112.05 ± 5.51 (silane treated unidirectional fibres) and 73.85 ± 4.10 (silane treated woven fibres) respectively. The mean flexural strength of silane treated unidirectional fibres (112.05 MPa) was highest and statistically highly significant (P < 0.0001) compared to all other groups. Conclusions Within the limitations of the current study, flexural strength of the reinforced PMMA interim fixed dental prosthesis was significantly higher (P < 0.0001) when compared to the unreinforced PMMA interim fixed dental prosthesis. The use of silane treated unidirectional glass fibres is an effective method of reinforcing interim fixed restorations made of PMMA resins. PMID:26843742

  11. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  12. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  13. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  14. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  15. Three-Phase Fault Currents Evaluation for Nigerian 28-Bus 330kv Transmission System

    NASA Astrophysics Data System (ADS)

    Adepoju, Gafari A.; Tijani, Muhammed A.; Sanusi, Mufutau A.; Olatunji, Dauda O.

    2012-03-01

    Fault studies are important power system analysis for stable and economical operations of power systems. Faults are categorised as symmetrical and unsymmetrical. In this paper, three-phase symmetrical fault is simulated using the Nigerian 28-Bus, 330kV Transmission Grid. Two different MatLab based programmes were developed; one program was for Load Flow Studies which determines prefault conditions for the power system based on Newton-Raphson method. The other program determines fault current magnitudes for threephase short-circuit on the power system. The information gained from the fault studies can be used for proper relay selections, settings, performances and coordination.

  16. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    SciTech Connect

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  17. Whole-body Vibration Exposure Intervention among Professional Bus and Truck Drivers: A Laboratory Evaluation of Seat-suspension Designs.

    PubMed

    Blood, Ryan P; Yost, Michael G; Camp, Janice E; Ching, Randal P

    2015-01-01

    Long-term exposure to seated whole-body vibration (WBV) is one of the leading risk factors for the development of low back disorders. Professional bus and truck drivers are regularly exposed to continuous WBV, since they spend the majority of their working hours driving heavy vehicles. This study measured WBV exposures among professional bus and truck drivers and evaluated the effects of seat-suspension designs using simulated field-collected data on a vibration table. WBV exposures were measured and compared across three different seat designs: an air-ride bus seat, an air-ride truck seat, and an electromagnetically active (EM-active) seat. Air-ride seats use a compressed-air bladder to attenuate vibrations, and they have been in operation throughout the transportation industry for many years. The EM-active seat is a relatively new design that incorporates a microprocessor-controlled actuator to dampen vibration. The vibration table simulated seven WBV exposure scenarios: four segments of vertical vibration and three scenarios that used field-collected driving data on different road surfaces-a city street, a freeway, and a section of rough roadway. The field scenarios used tri-axial WBV data that had been collected at the seat pan and at the driver's sternum, in accordance with ISO 2631-1 and 2631-5. This study found that WBV was significantly greater in the vertical direction (z-axis) than in the lateral directions (x-and y-axes) for each of the three road types and each of the three types of seats. Quantitative comparisons of the results showed that the floor-to-seat-pan transmissibility was significantly lower for the EM-active seat than for either the air-ride bus seat or the air-ride truck seat, across all three road types. This study also demonstrated that seat-suspension designs have a significant effect on the vibrations transmitted to vehicle operators, and the study's results may prove useful in designing future seat suspensions.

  18. Evaluation of 2004 Toyota Prius Hybrid Electic Drive System Interim Report - Revised

    SciTech Connect

    Ayers, C.W.; Hsu, J.S.; Marlino, L.D.; Miller, C.W.; Ott, G.W., Jr.; Oland, C.B.; Burress, T.A.

    2007-07-31

    The 2004 Toyota Prius is a hybrid automobile equipped with a gasoline engine and a battery-powered electric motor. Both of these motive power sources are capable of providing mechanical drive power for the vehicle. The engine can deliver a peak power output of 57 kilowatts (kW) at 5000 revolutions per minute (rpm) while the motor can deliver a peak power output of 50 kW at 1300 rpm. Together, this engine-motor combination has a specified peak power output of 82 kW at a vehicle speed of 85 kilometers per hour (km/h). In operation, the 2004 Prius exhibits superior fuel economy compared to conventionally powered automobiles. Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  19. Evaluating a GPS-Based Transportation Device to Support Independent Bus Travel by People with Intellectual Disability

    ERIC Educational Resources Information Center

    Davies, Daniel K.; Stock, Steven E.; Holloway, Shane; Wehmeyer, Michael L.

    2010-01-01

    We examined the utility of a PDA-based software system with integrated GPS technology for providing location-aware visual and auditory prompts to enable people with intellectual disability to successfully navigate a downtown bus route. Participants using the system were significantly more successful at completing a bus route than were people in a…

  20. TMS communications software. Volume 2: Bus interface unit

    NASA Technical Reports Server (NTRS)

    Gregor, P. J.

    1979-01-01

    A data bus communication system to support the space shuttle's Trend Monitoring System (TMS) and to provide a basis for evaluation of the bus concept is described. Installation of the system included developing both hardware and software interfaces between the bus and the specific TMS computers and terminals. The software written for the microprocessor-based bus interface units is described. The software implements both the general bus communications protocol and also the specific interface protocols for the TMS computers and terminals.

  1. Evaluation of emission toxicity of urban bus engines: compressed natural gas and comparison with liquid fuels.

    PubMed

    Turrio-Baldassarri, Luigi; Battistelli, Chiara Laura; Conti, Luigi; Crebelli, Riccardo; De Berardis, Barbara; Iamiceli, Anna Laura; Gambino, Michele; Iannaccone, Sabato

    2006-02-15

    Emissions from a spark-ignition (SI) heavy-duty (HD) urban bus engine with a three-way catalyst (TWC), fuelled with compressed natural gas (CNG), were chemically analyzed and tested for genotoxicity. The results were compared with those obtained in a previous study on an equivalent diesel engine, fuelled with diesel oil (D) and a blend of the same with 20% vegetable oil (B20). Experimental procedures were identical, so that emission levels of the CNG engine were exactly comparable to the ones of the diesel engine. The experimental design was focused on carcinogenic compounds and genotoxic activity of exhausts. The results obtained show that the SI CNG engine emissions, with respect to the diesel engine fuelled with D, were nearly 50 times lower for carcinogenic polycyclic aromatic hydrocarbons (PAHs), 20 times lower for formaldehyde, and more than 30 times lower for particulate matter (PM). A 20-30 fold reduction of genotoxic activity was estimated from tests performed. A very high reduction of nitrogen oxides (NO(X)) was also measured. The impact of diesel powered transport on urban air quality, and the potential benefits deriving from the use of CNG for public transport, are discussed.

  2. Evaluating a GPS-based transportation device to support independent bus travel by people with intellectual disability.

    PubMed

    Davies, Daniel K; Stock, Steven E; Holloway, Shane; Wehmeyer, Michael L

    2010-12-01

    We examined the utility of a PDA-based software system with integrated GPS technology for providing location-aware visual and auditory prompts to enable people with intellectual disability to successfully navigate a downtown bus route. Participants using the system were significantly more successful at completing a bus route than were people in a control group, who used a map and verbal directions. Further, when using the GPS-based system, 73% of participants successfully rang the bell and exited the bus at the right stop compared with only 8% of the control group. This finding was observed for individuals attempting to follow a new bus route for the first time and get off the bus at a previously unknown location.

  3. Evaluation of estrogenic potential of flavonoids using a recombinant yeast strain and MCF7/BUS cell proliferation assay.

    PubMed

    Resende, Flávia A; de Oliveira, Ana Paula S; de Camargo, Mariana S; Vilegas, Wagner; Varanda, Eliana A

    2013-01-01

    Phytoestrogens are of interest because of their reported beneficial effects on many human maladies including cancer, neurodegeneration, cardiovascular disease and diabetes. Furthermore, there is a search for compounds with estrogenic activity that can replace estrogen in hormone replacement therapy during menopause, without the undesirable effects of estrogen, such as the elevation of breast cancer occurrence. Thus, the principal objective of this study was to assess the estrogenic activity of flavonoids with different hydroxylation patterns: quercetin, kaempferol, luteolin, fisetin, chrysin, galangin, flavone, 3-hydroxyflavone, 5-hydroxyflavone and 7-hydroxyflavone via two different in vitro assays, the recombinant yeast assay (RYA) and the MCF-7 proliferation assay (E-screen), since the most potent phytoestrogens are members of the flavonoid family. In these assays, kaempferol was the only compound that showed ERα-dependent transcriptional activation activity by RYA, showing 6.74±1.7 nM EEQ, besides acting as a full agonist for the stimulation of proliferation of MCF-7/BUS cells. The other compounds did not show detectable levels of interaction with ER under the conditions used in the RYA. However, in the E-screen assay, compounds such as galangin, luteolin and fisetin also stimulated the proliferation of MCF-7/BUS cells, acting as partial agonists. In the evaluation of antiestrogenicity, the compounds quercetin, chrysin and 3-hydroxyflavone significantly inhibited the cell proliferation induced by 17-β-estradiol in the E-screen assay, indicating that these compounds may act as estrogen receptor antagonists. Overall, it became clear in the assay results that the estrogenic activity of flavonoids was affected by small structural differences such as the number of hydroxyl groups, especially those on the B ring of the flavonoid.

  4. Evaluation of Estrogenic Potential of Flavonoids Using a Recombinant Yeast Strain and MCF7/BUS Cell Proliferation Assay

    PubMed Central

    Resende, Flávia A.; de Oliveira, Ana Paula S.; de Camargo, Mariana S.; Vilegas, Wagner; Varanda, Eliana A.

    2013-01-01

    Phytoestrogens are of interest because of their reported beneficial effects on many human maladies including cancer, neurodegeneration, cardiovascular disease and diabetes. Furthermore, there is a search for compounds with estrogenic activity that can replace estrogen in hormone replacement therapy during menopause, without the undesirable effects of estrogen, such as the elevation of breast cancer occurrence. Thus, the principal objective of this study was to assess the estrogenic activity of flavonoids with different hydroxylation patterns: quercetin, kaempferol, luteolin, fisetin, chrysin, galangin, flavone, 3-hydroxyflavone, 5-hydroxyflavone and 7-hydroxyflavone via two different in vitro assays, the recombinant yeast assay (RYA) and the MCF-7 proliferation assay (E-screen), since the most potent phytoestrogens are members of the flavonoid family. In these assays, kaempferol was the only compound that showed ERα-dependent transcriptional activation activity by RYA, showing 6.74±1.7 nM EEQ, besides acting as a full agonist for the stimulation of proliferation of MCF-7/BUS cells. The other compounds did not show detectable levels of interaction with ER under the conditions used in the RYA. However, in the E-screen assay, compounds such as galangin, luteolin and fisetin also stimulated the proliferation of MCF-7/BUS cells, acting as partial agonists. In the evaluation of antiestrogenicity, the compounds quercetin, chrysin and 3-hydroxyflavone significantly inhibited the cell proliferation induced by 17-β-estradiol in the E-screen assay, indicating that these compounds may act as estrogen receptor antagonists. Overall, it became clear in the assay results that the estrogenic activity of flavonoids was affected by small structural differences such as the number of hydroxyl groups, especially those on the B ring of the flavonoid. PMID:24098354

  5. Safety evaluation for the interim stabilization of Tank 241-C-103

    SciTech Connect

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  6. Evaluation of higher distribution and/or utilization voltages. Fourth interim report (August 1980): assessment of optimum distribution configuration

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the fourth task, Assessment of Optimum Distribution Configuration, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of a computer model for assessment of life cycle costs for the distribution and utilization systems, the development of an optimization algorithm to enable distribution system configuration optimization and a net energy analysis to determine potential net energy savings. Input data for this task derive from Task 3. The major output of this task is a documented computer code.

  7. Bus Training Handbook.

    ERIC Educational Resources Information Center

    Dorny, Audrea; Cole, ChiKay

    This manual presents guidelines for teaching students with disabilities necessary skills for safe and independent travel on public buses. Six guidelines for teachers include: (1) participate in bus training; (2) use wise and intelligent judgment; (3) utilize the bus checklist; (4) know and teach bus rules; (5) know bus routes; and (6) know bus…

  8. Evaluation of the Flexural Strength of Interim Restorative Materials in Fixed Prosthodontics

    PubMed Central

    Mehrpour, Hanieh; Farjood, Ehsan; Giti, Rashin; Barfi Ghasrdashti, Alireza; Heidari, Hossein

    2016-01-01

    Statement of the Problem Mechanical properties of interim restorations are considered as important factors specially when selecting materials for long-term application or for patients with para-functional habits. Flexural strength is one of the most important components of these restorations. Purpose The purpose of this study was to compare the flexural strength of five interim restorative materials. Materials and Method Fifty identical samples sized 25×2×2-mm were made from five interim materials (TempSpan; Protemp 4, Unifast III, Trim, and Revotek LC) according to ADA specification #27. The specimens were stored in artificial saliva for 2 weeks and then thermocycled for 2500 cycles (5-55˚C). A standard three-point bending test was conducted on the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Data were analyzed by using one-way ANOVA and Tamhane’s post-hoc tests to measure the flexural strength of temporary materials. Results One of the bis-acryl resins (TempSpan) showed the highest, and the light polymerized resin (Revotek LC) showed the lowest flexural strength. The mean values of flexural strength (MPa) for the examined materials were as follow: TempSpan=120.00, Protemp 4=113.00, Unifast III=64.20, Trim= 63.73 and Revotek LC=47.16. There were significant differences between all materials except Trim and Unifast III which did not show any statistical significant difference. Conclusion Bis-acryl resins were statistically superior to traditional methacrylate and light-cured resins. Therefore, application of bis-acryl resins should be deliberated in patients with heavy occlusion and in cases that need long-term use of interim restorations. PMID:27602395

  9. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    NASA Technical Reports Server (NTRS)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  10. Evaluation of ceramics for stator applications: Gas turbine engines interim report. Stator fabrication and evaluation

    NASA Technical Reports Server (NTRS)

    Arnon, N.; Trela, W.

    1983-01-01

    The objective was to assess current ceramic materials, fabrication processes, reliability prediction, and stator durability when subjected to simulated automotive gas turbine engine operating conditions. Ceramic one-piece stators were fabricated of two materials, silicon nitride and silicon carbide, using two near-net-shape processes, slip casting and injection molding. Non-destructive evaluation tests were conducted on all stators identifying irregularities which could contribute to failures under durability testing. Development of the test rig and automatic control system for repeatably controlling air flow rate and temperature over a highly transient durability duty cycle is discussed. Durability results are presented for repeated thermal cycle testing of the ceramic one-piece stators. Two duty cycles were used, encompassing the temperature ranges of 704 to 1204 C (1300 to 2200 F) and 871 to 1371 C (1600 to 2500 F). Tests were conducted on 28 stators, accumulating 135,551 cycles in 2441 hours of hot testing. Cyclic durability for the ceramic one-piece stator was demonstrated to be in excess of 500 hours, accumulating over 28,850 thermal cycles. Ceramic interface forces were found to be the significant factor in limiting stator life rather than the scatter in material strength properties or the variation in component defects encountered.

  11. Interim Guidelines for the Evaluation and Testing of Infants with Possible Congenital Zika Virus Infection - United States, 2016.

    PubMed

    Staples, J Erin; Dziuban, Eric J; Fischer, Marc; Cragan, Janet D; Rasmussen, Sonja A; Cannon, Michael J; Frey, Meghan T; Renquist, Christina M; Lanciotti, Robert S; Muñoz, Jorge L; Powers, Ann M; Honein, Margaret A; Moore, Cynthia A

    2016-01-29

    CDC has developed interim guidelines for health care providers in the United States who are caring for infants born to mothers who traveled to or resided in an area with Zika virus transmission during pregnancy. These guidelines include recommendations for the testing and management of these infants. Guidance is subject to change as more information becomes available; the latest information, including answers to commonly asked questions, can be found online (http://www.cdc.gov/zika). Pediatric health care providers should work closely with obstetric providers to identify infants whose mothers were potentially infected with Zika virus during pregnancy (based on travel to or residence in an area with Zika virus transmission [http://wwwnc.cdc.gov/travel/notices]), and review fetal ultrasounds and maternal testing for Zika virus infection (see Interim Guidelines for Pregnant Women During a Zika Virus Outbreak*) (1). Zika virus testing is recommended for 1) infants with microcephaly or intracranial calcifications born to women who traveled to or resided in an area with Zika virus transmission while pregnant; or 2) infants born to mothers with positive or inconclusive test results for Zika virus infection. For infants with laboratory evidence of a possible congenital Zika virus infection, additional clinical evaluation and follow-up is recommended. Health care providers should contact their state or territorial health department to facilitate testing. As an arboviral disease, Zika virus disease is a nationally notifiable condition.

  12. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell& Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects (Fact Sheet)

    SciTech Connect

    Eudy, L.

    2003-08-01

    Fact sheet describes the ThunderPower hydrogen fuel cell bus that was demonstrated at SunLine Transit Agency from November 2002 to February 2003. The bus was evaluated by DOE's Advanced Vehicle Testing Activity.

  13. 75 FR 52054 - Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Federal Transit Administration Bus and Bus Facilities Discretionary Program Funds AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Bus and Bus Facilities Livability program announcement of project selections... selection of projects funded with Bus and Bus Facilities program funds in support of DOT's...

  14. Road safety issues for bus transport management.

    PubMed

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding

  15. Southern Hemisphere Cloudiness In Extratropical Cyclones: An Observational Evaluation Of ERA-interim And MERRA

    NASA Astrophysics Data System (ADS)

    Naud, C. M.; Booth, J. F.; Del Genio, A. D.; Posselt, D. J.; van den Heever, S. C.

    2013-12-01

    Recently, underestimates in modeled southern oceans cloud cover were reported for most major general circulation models. However, it is unclear if reanalyses that assimilate multiple observations, and as such are deemed more reliable, also have this issue. Using MODIS, MISR and CloudSat-CALIPSO cloud cover datasets as a reference, we show that the same problem is found in both the ERA-interim and the MERRA reanalysis. We find that both reanalyses underestimate cloud cover by 5% to 20% in the 30S to 60S latitude band. Since extratropical cyclones are ubiquitous in this region, we determined whether clouds in these systems were also underestimated in both reanalyses. The MAP climatology of midlatitude storminess database is used to locate extratropical cyclones, and MODIS, MISR and CloudSat-CALIPSO provide the coincident and collocated cloud cover. An intercomparison between MODIS, MISR and CloudSat-CALIPSO cyclone-centered composites of cloud fractions was performed to provide a measure of the observational uncertainty. Uncertainty in the datasets was found to be less than the cloud cover bias in the reanalyses. It was evident that both ERA-interim and MERRA underestimate cloud cover in extratropical cyclones. Additionally, the underestimation was regime dependent, with a minimum bias in the cyclone warm sector north east of the low-pressure center and a maximum bias to the west of the low-pressure center and west of the cold front. MODIS and MISR cloud properties indicate that this maximum bias in cloud cover occurs in an area populated by low-level clouds often of broken nature. Comparison between reanalyses and CloudSat-CALIPSO vertical profiles reveal that this lack of low level clouds is also present to the east of the low-pressure centers in the warm frontal region. The cloud cover low bias is more pronounced in the MERRA reanalysis than ERA-interim, but differences between the two reanalyses in the dynamical and thermodynamical properties of the cyclones

  16. Information management advanced development. Volume 3: Digital data bus breadboard

    NASA Technical Reports Server (NTRS)

    Gerber, C. R.

    1972-01-01

    The design, development, and evaluation of the digital data bus breadboard for the modular space station are discussed. Subjects presented are: (1) requirements summary, (2) parametric data for bus design, (3) redundancy concepts, and (4) data bus breadboard performance and interface requirements.

  17. Evaluation of the interim measurement protocol for railway noise source description

    NASA Astrophysics Data System (ADS)

    Janssens, M. H. A.; Jansen, H. W.; Dittrich, M. G.

    2006-06-01

    The Dutch national calculation scheme for railway noise has been declared the default interim method for railway noise calculation by the EU, until the introduction of results from the Harmonoise project. It includes a measurement protocol for determining emission input data in the format suitable for the present calculation scheme. The calculation scheme contains a fixed database of emission data for common Dutch rolling stock. The measurement protocol provides for the addition of emission data of new or foreign rolling stock. This is relevant for the Netherlands, as such rolling stock increasingly appears on the network, but also for other European countries that are going to use the interim method, since emission data for their rolling stock have to be established. The protocol features two procedures. Procedure A allows using the existing fixed database of emission data. Selection of a particular dataset (or 'category') can be based on external appearance of rolling stock (without measurements) or pass-by sound pressure level measurements at a site with known rail roughness. If a user finds that none of the existing data sets properly represent its rolling stock, the optional procedure B is available. This procedure assesses pass-by levels, track and wheel roughness levels. The measurement protocol is based on a type-test-like procedure requiring controlled conditions for the vehicle and track. A measurement campaign has been undertaken to test procedures A and B. This campaign coincided with a Swiss campaign to establish the sound emission of freight vehicles equipped with composite block brakes. The test of the protocol was focussed both on the practicability of the required measurements and on the unambiguity and comprehensiveness of the test. Open questions, findings, resulting conclusions and recommendations regarding the protocol are discussed here.

  18. Downwelling longwave flux over Summit, Greenland, 2010-2012: Analysis of surface-based observations and evaluation of ERA-Interim using wavelets

    NASA Astrophysics Data System (ADS)

    Cox, Christopher J.; Walden, Von P.; Compo, Gilbert P.; Rowe, Penny M.; Shupe, Matthew D.; Steffen, Konrad

    2014-11-01

    This study analyzes the downwelling longwave radiation (DLW) over the Greenland Ice Sheet (GrIS) using surface-based observations from Summit Station (72°N, 38°W; 3210 m) and the European Centre for Medium-Range Weather Forecasts Interim Reanalysis (ERA-Interim) DLW fields. Since surface-based observations are sparse in the Arctic, the accuracy of including reanalyses for spatial context is assessed. First, the DLW at Summit is reported, including the significant time scales of variability using time-frequency decomposition (wavelet analysis). A new method for evaluating reanalyses is then introduced that also uses wavelet analysis. ERA-Interim DLW performs reasonably well at Summit, but because it includes too many thin clouds and too few thick clouds, it is biased low overall. The correlation between the observations and ERA-Interim drops from r2 > 0.8 to near 0 for time series reconstructed from time scales less than ~4 days. These low correlations and additional analyses suggest that the spatial resolution of the data sets is a factor in representing variability on short time scales. The bias is low across all time scales and is thus likely tied to cloud generation processes in the model rather than the spatial representation of the atmosphere across the GrIS. The exception is autumn, when ERA-Interim overestimates the influence of clouds at time scales of 1 and 4 weeks. The spatial distribution of cloud influence on the DLW across the GrIS indicates that Summit is located in a transition zone with respect to cloud properties. The gradient across this transition zone is steepest near Summit in autumn, so the spatial characteristics of the atmosphere near Summit may contribute to the ERA-Interim bias during this time.

  19. An Evaluation of the Influence of Interim Assessments on Grade 8 Student Achievement in Mathematics and Language Arts

    ERIC Educational Resources Information Center

    Pereira, Maria; Tienken, Christopher

    2012-01-01

    A review of the literature pertaining to the effect and influence that interim assessments have on student achievement lacks quantitative data to determine the efficiency of their use in the classroom as a school reform tool. This study examined the strength and the direction of the relationships between interim pre and posttest assessments in…

  20. Evaluation of groundwater flow and transport at the Shoal underground nuclear test: An interim report

    SciTech Connect

    Pohll, G.; Chapman, J.; Hassan, A.; Papelis, C.; Andricevic, R.; Shirley, C.

    1998-07-01

    Since 1962, all United States nuclear tests have been conducted underground. A consequence of this testing has been the deposition of large amounts of radioactive materials in the subsurface, sometimes in direct contact with groundwater. The majority of this testing occurred on the Nevada Test Site, but a limited number of experiments were conducted in other locations. One of these is the subject of this report, the Project Shoal Area (PSA), located about 50 km southeast of Fallon, Nevada. The Shoal test consisted of a 12-kiloton-yield nuclear detonation which occurred on October 26, 1963. Project Shoal was part of studies to enhance seismic detection of underground nuclear tests, in particular, in active earthquake areas. Characterization of groundwater contamination at the Project Shoal Area is being conducted by the US Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) with the State of Nevada Department of Environmental Protection and the US Department of Defense (DOD). This order prescribes a Corrective Action Strategy (Appendix VI), which, as applied to underground nuclear tests, involves preparing a Corrective Action Investigation Plan (CAIP), Corrective Action Decision Document (CADD), Corrective Action Plan, and Closure Report. The scope of the CAIP is flow and transport modeling to establish contaminant boundaries that are protective of human health and the environment. This interim report describes the current status of the flow and transport modeling for the PSA.

  1. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. Link to an... disability wishes to travel is already provided by an accessible bus, the operator has met this requirement... accessible buses (e.g., a small fixed-route operator who exclusively or primarily purchases or leases...

  2. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    SciTech Connect

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.

  3. Hydrogen powered bus

    SciTech Connect

    2011-04-07

    Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

  4. Hydrogen powered bus

    ScienceCinema

    None

    2016-07-12

    Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

  5. 76 FR 37184 - Discretionary Bus and Bus Facilities Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Federal Transit Administration Discretionary Bus and Bus Facilities Program AGENCY: Federal Transit... initiative funds: Solicitation of project proposals. SUMMARY: The Federal Transit Administration (FTA... this initiative. The SGR Bus initiative will make funds available to public transit providers...

  6. School Bus Safety Report.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This publication provides a summary and update of school bus-safety activities conducted by the National Highway Traffic Safety Administration (NHTSA). This report discusses Congressional mandates and NHTSA's actions to improve school-bus safety (which include programs that affect human behavior and motor-vehicle safety performance), the magnitude…

  7. Interim Outcomes Assessment of the Comprehensive Clinical Performance Grid for Student Evaluation.

    ERIC Educational Resources Information Center

    Tolls, Dorothy Bazzinotti; Carlson, Nancy; Wilson, Roger; Richman, Jack

    2001-01-01

    Assessed the viability of the Comprehensive Clinical Performance Grid for Student Evaluation, introduced at The New England College of Optometry in 1996 in clinical student assessment. Analyzed faculty and student feedback and consistency with previous evaluations, between evaluators, and between clinical sites and tracts. Found satisfaction with…

  8. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  9. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  10. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  11. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  12. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  13. Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet (Fact Sheet)

    SciTech Connect

    Not Available

    2010-05-01

    This fact sheet reports on the City of Burbank, California's fuel cell bus demonstration project and the U.S. Department of Energy's (DOE) involvement. Included are specifications for the fuel cell bus and information about its operation. BurbankBus, the city's mass transit entity, received a grant from the California Air Resources Board to fund its zero-emission bus demonstration and is collaborating with DOE's Fuel Cell Technologies Program to evaluate the bus performance. DOE's National Renewable Energy Laboratory will collect and analyze performance and operations data for at least one year. Researchers will use the data to better understand the technology and determine future development work. In addition, demonstration information will help fleets make informed purchase decisions.

  14. Interim Guidelines for Evaluation of Instructional Materials with Respect to Social Content.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Curriculum Framework and Instructional Materials Unit.

    The purpose of these guidelines is to provide consistent, systematic standards for evaluating instructional materials proposed for use in California's public schools to ensure compliance with the Education Code. Though they are not intended to supplant the evaluator's judgment, the guidelines do comprise the minimum standards for acceptability in…

  15. Low Energy Utilization School: Research, Design, Construction, and Evaluation. Phase 1: Interim Report.

    ERIC Educational Resources Information Center

    Stein, Richard G.; Stein, Carl

    The purpose of this study was to establish more precisely what factors determine energy use in schools, to evaluate the efficiency of and necessity for these, and to make recommendations for the reduction of energy use. These recommendations will be applied to the design of specific projects that will be built, monitored, and evaluated. This…

  16. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  17. The Follow Through Planned Variation Experiment; Volume V. Appendix: Analysis of Interim Follow Through Evaluation Reports.

    ERIC Educational Resources Information Center

    Villaume, John; Haney, Walt

    This report is the appendix to the last volume in a five volume series on the national evaluation study of the Follow Through Planned Variation Model. The appendix is organized in three sections. Section I provides detailed summaries of five major national Follow Through evaluation reports not published as part of this series. Section II is an…

  18. Evaluation of Flexural Strength of Thermocycled Interim Resin Materials Used in Prosthetic Rehabilitation- An In-vitro Study

    PubMed Central

    Kadiyala, Krishna Kishore; Anne, Gopinadh; Anche, Sampath Chowdary; Chiramana, Sandeep; Muvva, Suresh Babu; Zakkula, Srujana; Jyothula, Ravi Rakesh Dev

    2016-01-01

    Introduction Provisional restoration is an analytical component of fixed prosthodontics serving as a ground plan for the design of fixed dental prosthesis. Flexural strength is critical in case of long standing fixed dental prosthesis, to appreciate success of full mouth rehabilitation cases and temporomandibular joint dysfunction therapies. Aim The present study was to evaluate the flexural strength of different provisional restorative resins used for prosthetic rehabilitation. Materials and Methods Forty identical samples (n=10 for each material) measuring 25mm×2mm×2mm according to ADA/ANSI specification no. 27 were fabricated using autopolymerizing Poly Methyl Methacrylate (PMMA) (Group A); heat activated PMMA (Group B); autopolymerizing Bis-GMA composite resin (Group C) and light activated Urethane Dimethacrylate Resin (UDMA) (Group D). For 14 days all these samples were stored in artificial saliva. Ten samples from each material were subjected to thermal cycling for 2500 cycles (5°C to 55°C). Later, a standard three point bending test was conducted on all the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Statistical analysis used included Kruskal-Wallis and Mann-Whitney U test. Results The mean flexural strength of specimens confirmed higher flexural strength for Group C (102.98 Mpa) followed by Group B (91.86 Mpa), Group A (79.13 Mpa) and Group D (60.01 Mpa). There were significant differences between any two materials tested (p <0.05). Comparison between mean flexural strength values between four groups revealed significant difference between the interim materials (p <0.05). Conclusion The greatest flexural strength was observed for Bis-GMA composite resins followed by heat cure methacrylate resins, autopolymerizing methacrylate resins and was least for light cure resins. While fabricating provisional restorations, these greater values should be considered for better outcome of the treatment. PMID:27790588

  19. National Evaluation of the Comprehensive Technical Assistance Centers. Interim Report. NCEE 2010-4033

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; White, Richard N.; Sinclair, Elizabeth; Riley, Derek; Sipe, Cynthia L.; Pistorino, Carol

    2010-01-01

    This first of two reports presents early findings from the National Evaluation of the Comprehensive Technical Assistance Centers (Comprehensive Centers), a federally funded program that provides technical assistance to states in connection with the No Child Left Behind (NCLB) Act of 2001. The law authorizing the Comprehensive Centers, the…

  20. STUDY AND TEST OF A METHODOLOGY FOR LABORATORY EVALUATION OF MESSAGE RETRIEVAL SYSTEMS. INTERIM REPORT.

    ERIC Educational Resources Information Center

    GIULIANO, VINCENT E.; JONES, PAUL E.

    THE MAIN OBJECTIVES OF THE ANALYSES INCLUDE--(1) A RESEARCH STUDY OF TECHNIQUES FOR THE EVALUATION OF ASSOCIATIVE AND COORDINATE MESSAGE RETRIEVAL METHODS. (2) THE PREPARATION AND ANALYSIS OF MACHINE-READABLE TEST CORPORA SUITABLE FOR EXPERIMENTS WITH ASSOCIATIVE MESSAGE RETRIEVAL METHODS. THESE CORPORA CONSIST OF APPROXIMATELY 10,000 MESSAGES AND…

  1. Evaluation of New Texas Charter Schools: Second Interim Report (2007-10). Executive Summary

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine

    2011-01-01

    The Texas Education Agency (TEA) was awarded Charter School Program (CSP) funding in 2007, and specified that the required evaluation would focus on the experiences and outcomes of new charter schools authorized to begin serving students across 4 school years: 2006-07, 2007-08, 2008-09, and 2009-10. TEA categorizes charter schools in terms of…

  2. An Evaluation of Jamestown Community College PROJECT HERCULES: First Stage Results. Interim Report.

    ERIC Educational Resources Information Center

    Olmstead, Joseph A.; Bushnell, David S.

    An evaluation study was conducted by Jamestown Community College (JCC) to determine the effects of PROJECT HERCULES. This demonstration project was initiated in 1974 to release selected staff members from routine tasks in order to assess community training and educational needs, communicate these needs to appropriate college personnel, and follow…

  3. The Grimes Alternative School Program and Home Remedies Program. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Williams, Jay R.

    This report describes and evaluates two programs which deal with chronic status offenders: the Grimes Alternative School Program, a delinquency prevention project which targets intermediate school (grades 4 and 5) students with chronic discipline and/or truant behaviors, and the Home Remedies Program, a short-term crisis intervention and…

  4. Update: Interim Guidance for the Evaluation and Management of Infants with Possible Congenital Zika Virus Infection - United States, August 2016.

    PubMed

    Russell, Kate; Oliver, Sara E; Lewis, Lillianne; Barfield, Wanda D; Cragan, Janet; Meaney-Delman, Dana; Staples, J Erin; Fischer, Marc; Peacock, Georgina; Oduyebo, Titilope; Petersen, Emily E; Zaki, Sherif; Moore, Cynthia A; Rasmussen, Sonja A

    2016-08-26

    CDC has updated its interim guidance for U.S. health care providers caring for infants born to mothers with possible Zika virus infection during pregnancy (1). Laboratory testing is recommended for 1) infants born to mothers with laboratory evidence of Zika virus infection during pregnancy and 2) infants who have abnormal clinical or neuroimaging findings suggestive of congenital Zika syndrome and a maternal epidemiologic link suggesting possible transmission, regardless of maternal Zika virus test results. Congenital Zika syndrome is a recently recognized pattern of congenital anomalies associated with Zika virus infection during pregnancy that includes microcephaly, intracranial calcifications or other brain anomalies, or eye anomalies, among others (2). Recommended infant laboratory evaluation includes both molecular (real-time reverse transcription-polymerase chain reaction [rRT-PCR]) and serologic (immunoglobulin M [IgM]) testing. Initial samples should be collected directly from the infant in the first 2 days of life, if possible; testing of cord blood is not recommended. A positive infant serum or urine rRT-PCR test result confirms congenital Zika virus infection. Positive Zika virus IgM testing, with a negative rRT-PCR result, indicates probable congenital Zika virus infection. In addition to infant Zika virus testing, initial evaluation of all infants born to mothers with laboratory evidence of Zika virus infection during pregnancy should include a comprehensive physical examination, including a neurologic examination, postnatal head ultrasound, and standard newborn hearing screen. Infants with laboratory evidence of congenital Zika virus infection should have a comprehensive ophthalmologic exam and hearing assessment by auditory brainstem response (ABR) testing before 1 month of age. Recommendations for follow-up of infants with laboratory evidence of congenital Zika virus infection depend on whether abnormalities consistent with congenital Zika syndrome

  5. Creative Bus Financing.

    ERIC Educational Resources Information Center

    Malone, Wade

    1982-01-01

    Alternative ways of financing school bus purchases include financing privately through contractors or commercial banks, financing through sources such as insurance companies and pension funds, leasing the buses, or contracting for transportation services. (Author/MLF)

  6. Airworthiness and Flight Characteristics Evaluation. OH-58C Interim Scout Helicopter

    DTIC Science & Technology

    1979-04-01

    stacks. A _btn.ian factors evaluation of the cockpit revealed one deficiency (the night vision goggle switch is easily adtivited and renders the...A night vision goggle ENABLE/DISABLE switch has been added to all aircraft solving this problem. (7) Para lOOg - The incorporation of a SCAS will...the night vision goggle switch is easily activated and renders the caution/advisory panel unreadable), and fourteen shortcomings. Two maintenance

  7. Evaluation of Juvenile Fall Chinook Stranding on the Hanford Reach, 1997-1999 Interim Report.

    SciTech Connect

    Wagner, Paul; Nugent, John; Price, William

    1999-02-15

    Pilot work conducted in 1997 to aid the development of the study for the 1998 Evaluation of Juvenile Fall Chinook Stranding on The Hanford Reach. The objectives of the 1997 work were to: (1) identify juvenile chinook production and rearing areas..., (2) identify sampling sites and develop the statistical parameters necessary to complete the study, (3) develop a study plan..., (4) conduct field sampling activities...

  8. SCSI Communication Test Bus

    NASA Technical Reports Server (NTRS)

    Hua, Chanh V.; D'Ambrose, John J.; Jaworski, Richard C.; Halula, Elaine M.; Thornton, David N.; Heligman, Robert L.; Turner, Michael R.

    1990-01-01

    Small Computer System Interface (SCSI) communication test bus provides high-data-rate, standard interconnection enabling communication among International Business Machines (IBM) Personal System/2 Micro Channel, other devices connected to Micro Channel, test equipment, and host computer. Serves primarily as nonintrusive input/output attachment to PS/2 Micro Channel bus, providing rapid communication for debugger. Opens up possibility of using debugger in real-time applications.

  9. Bus.py

    SciTech Connect

    Hansen, Timothy; Palmintier, Bryan; Hale, Elaine; Jones, Wesley

    2014-07-21

    GridLAB-D is an agent? based distribution system simulation environment that allows fine-grained end-user models, including geospatial and network topology detail. GridLAB-D addresses the lack of runtime interaction by designing a flexible communication interface, Bus.py (pronounced bus-dot-pie), that uses Python to pass messages between one or more GridLAB-D instances and a Smart Grid simulator.

  10. Program Alternatives to Special Education. Interim Report on 1985-86. O.E.A. Evaluation Report.

    ERIC Educational Resources Information Center

    Hebard, Amy J.; And Others

    This interim report on the Program Alternatives to Special Education (PASE) program in New York City: (1) describes strategies offered by 32 districts that provide program alternatives to special education referrals; (2) elucidates the strengths and weaknesses of program designs and highlights factors having positive effects on at-risk children;…

  11. Savannah River bus project

    SciTech Connect

    Summers, W.A.

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  12. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  13. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  14. Plug-In Hybrid Electric Vehicle Value Proposition Study: Interim Report: Phase I Scenario Evaluation

    SciTech Connect

    Sikes, Karen R; Markel, Lawrence C; Hadley, Stanton W; Hinds, Shaun; DeVault, Robert C

    2009-01-01

    Plug-in hybrid electric vehicles (PHEVs) offer significant improvements in fuel economy, convenient low-cost recharging capabilities, potential environmental benefits, and decreased reliance on imported petroleum. However, the cost associated with new components (e.g., advanced batteries) to be introduced in these vehicles will likely result in a price premium to the consumer. This study aims to overcome this market barrier by identifying and evaluating value propositions that will increase the qualitative value and/or decrease the overall cost of ownership relative to the competing conventional vehicles and hybrid electric vehicles (HEVs) of 2030 During this initial phase of this study, business scenarios were developed based on economic advantages that either increase the consumer value or reduce the consumer cost of PHEVs to assure a sustainable market that can thrive without the aid of state and Federal incentives or subsidies. Once the characteristics of a thriving PHEV market have been defined for this timeframe, market introduction steps, such as supportive policies, regulations and temporary incentives, needed to reach this level of sustainability will be determined. PHEVs have gained interest over the past decade for several reasons, including their high fuel economy, convenient low-cost recharging capabilities, potential environmental benefits and reduced use of imported petroleum, potentially contributing to President Bush's goal of a 20% reduction in gasoline use in ten years, or 'Twenty in Ten'. PHEVs and energy storage from advanced batteries have also been suggested as enabling technologies to improve the reliability and efficiency of the electric power grid. However, PHEVs will likely cost significantly more to purchase than conventional or other hybrid electric vehicles (HEVs), in large part because of the cost of batteries. Despite the potential long-term savings to consumers and value to stakeholders, the initial cost of PHEVs presents a major

  15. Interim findings of an evaluation of the U.S. EnergyGuide label

    SciTech Connect

    Egan, Christine; Payne, Christopher T.; Thorne, Jennifer

    2000-08-20

    The United States has labeled appliances with the EnergyGuide labels since 1980. Consensus is growing that this label is confusing to consumers and has little impact on purchase decisions. Many researchers have documented that alternative labeling approaches are effective in other countries. The authors comprehensively evaluated the U.S. appliance labeling program for white goods, heating and cooling equipment, and water heaters, with emphasis on products sold through retail outlets. To date, our research has included consumer focus groups and semi-structured interviews with various market actors to assess how best to communicate energy information. With consumers and retail sales staff, five graphical designs were tested a European-style, letter based graphic; an Australian-style star-based graphic; a speedometer-style graphic; a thermometer-style graphic; and the current U.S. style. With manufacturers and contractors, we did not directly test alternate designs. Instead, we asked their opinion of and experience with the current EnergyGuide labeling program.

  16. Emission inventory estimation of an intercity bus terminal.

    PubMed

    Qiu, Zhaowen; Li, Xiaoxia; Hao, Yanzhao; Deng, Shunxi; Gao, H Oliver

    2016-06-01

    Intercity bus terminals are hotspots of air pollution due to concentrated activities of diesel buses. In order to evaluate the bus terminals' impact on air quality, it is necessary to estimate the associated mobile emission inventories. Since the vehicles' operating condition at the bus terminal varies significantly, conventional calculation of the emissions based on average emission factors suffers the loss of accuracy. In this study, we examined a typical intercity bus terminal-the Southern City Bus Station of Xi'an, China-using a multi-scale emission model-(US EPA's MOVES model)-to quantity the vehicle emission inventory. A representative operating cycle for buses within the station is constructed. The emission inventory was then estimated using detailed inputs including vehicle ages, operating speeds, operating schedules, and operating mode distribution, as well as meteorological data (temperature and humidity). Five functional areas (bus yard, platforms, disembarking area, bus travel routes within the station, and bus entrance/exit routes) at the terminal were identified, and the bus operation cycle was established using the micro-trip cycle construction method. Results of our case study showed that switching to compressed natural gas (CNG) from diesel fuel could reduce PM2.5 and CO emissions by 85.64 and 6.21 %, respectively, in the microenvironment of the bus terminal. When CNG is used, tail pipe exhaust PM2.5 emission is significantly reduced, even less than brake wear PM2.5. The estimated bus operating cycles can also offer researchers and policy makers important information for emission evaluation in the planning and design of any typical intercity bus terminals of a similar scale.

  17. 7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS AND PARKING LOT AREA. LOOKING WNW. GIS: N-37 40 36.2 / W-119 44 45.0 - Yosemite National Park Roads & Bridges, Yosemite Village, Mariposa County, CA

  18. Research in bus and rail transit operations

    SciTech Connect

    Chatterjee, A.; Wegmann, F.J.; Ceder, A.; Levinson, H.S.; Hollander, A.

    1989-01-01

    The 10 papers in the report deal with the following areas: Private Sector Involvement in Sponsoring Sunday Bus Service; Optimal Design of Transit Short-Turn Trips; New York City's Unfranchised Buses: Case Study in Deregulation; Critical Factors in Planning Multimodal Passenger Terminals; Use of Travelers' Attitudes in Rail Service Design; Driven, Attended, and Fully Automated Transit; Qualitative Comparison; Impact on Transit Patronage of Cessation or Inauguration of Rail Service; Use of Productivity Factors in Estimating LRT Operating Costs; Simulation Study To Evaluate Spare Ratios in Bus Transit Systems; Statistical Evaluation of Spare Ratio in Transit Rolling Stock.

  19. 77 FR 48592 - Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Livability (BLIV) initiatives funded under the Section 5309 Bus and Bus Facilities program, which is... used consistent with the competitive proposal and for the eligible purposes defined under 49 U.S.C... under 49 U.S.C. 5309(b)(3). In selecting projects for funding using Bus Program funds, FTA ensured...

  20. Evaluation and Analysis of SEASAT-A Scanning Multichannel Microwave Radiometer (SSMR) Antenna Pattern Correction (APC) Algorithm. Sub-task 4: Interim Mode T Sub B Versus Cross and Nominal Mode T Sub B

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.

  1. Personal Computer Monitors Instrumentation Bus

    NASA Technical Reports Server (NTRS)

    Conroy, Bruce L.

    1994-01-01

    IBM-compatible personal computer used instead of logic analyzer or other special instrument to monitor IEEE-488 interface data bus that interconnects various pieces of laboratory equipment. Needed is short program for computer, commercial general-purpose interface bus circuit card, and adapter cable to link card to bus. Software available in Ada or Quick Basic language.

  2. Statistical Analysis of Bus Networks in India

    PubMed Central

    2016-01-01

    In this paper, we model the bus networks of six major Indian cities as graphs in L-space, and evaluate their various statistical properties. While airline and railway networks have been extensively studied, a comprehensive study on the structure and growth of bus networks is lacking. In India, where bus transport plays an important role in day-to-day commutation, it is of significant interest to analyze its topological structure and answer basic questions on its evolution, growth, robustness and resiliency. Although the common feature of small-world property is observed, our analysis reveals a wide spectrum of network topologies arising due to significant variation in the degree-distribution patterns in the networks. We also observe that these networks although, robust and resilient to random attacks are particularly degree-sensitive. Unlike real-world networks, such as Internet, WWW and airline, that are virtual, bus networks are physically constrained. Our findings therefore, throw light on the evolution of such geographically and constrained networks that will help us in designing more efficient bus networks in the future. PMID:27992590

  3. Statistical Analysis of Bus Networks in India.

    PubMed

    Chatterjee, Atanu; Manohar, Manju; Ramadurai, Gitakrishnan

    2016-01-01

    In this paper, we model the bus networks of six major Indian cities as graphs in L-space, and evaluate their various statistical properties. While airline and railway networks have been extensively studied, a comprehensive study on the structure and growth of bus networks is lacking. In India, where bus transport plays an important role in day-to-day commutation, it is of significant interest to analyze its topological structure and answer basic questions on its evolution, growth, robustness and resiliency. Although the common feature of small-world property is observed, our analysis reveals a wide spectrum of network topologies arising due to significant variation in the degree-distribution patterns in the networks. We also observe that these networks although, robust and resilient to random attacks are particularly degree-sensitive. Unlike real-world networks, such as Internet, WWW and airline, that are virtual, bus networks are physically constrained. Our findings therefore, throw light on the evolution of such geographically and constrained networks that will help us in designing more efficient bus networks in the future.

  4. Augmented Thermal Bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1996-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurality of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pumps to maintain isothermality in the source.

  5. Augmented thermal bus

    NASA Technical Reports Server (NTRS)

    Schrage, Dean S. (Inventor)

    1993-01-01

    The present invention is directed to an augmented thermal bus. In the present design a plurity of thermo-electric heat pumps are used to couple a source plate to a sink plate. Each heat pump is individually controlled by a model based controller. The controller coordinates the heat pump to maintain isothermality in the source.

  6. Computer-Based Video Instruction to Teach Students with Intellectual Disabilities to Use Public Bus Transportation

    ERIC Educational Resources Information Center

    Mechling, Linda; O'Brien, Eileen

    2010-01-01

    This study investigated the effectiveness of computer-based video instruction (CBVI) to teach three young adults with moderate intellectual disabilities to push a "request to stop bus signal" and exit a city bus in response to target landmarks. A multiple probe design across three students and one bus route was used to evaluate effectiveness of…

  7. SunLine Leads the Way in Demonstrating Hydrogen-Fueled Bus Technologies (Brochure)

    SciTech Connect

    Not Available

    2011-01-01

    This brochure describes SunLine Transit Agency's newest advanced technology fuel cell electric bus. SunLine is collaborating with the U.S. Department of Energy's Fuel Cell Technologies Program to evaluate the bus in revenue service. This bus represents the sixth generation of hydrogen-fueled buses that the agency has operated since 2000.

  8. Investigations of emergency destruction methods for recovered, explosively configured, chemical warfare munitions: Interim emergency destruction methods - evaluation report

    SciTech Connect

    Baer, M.R.; Cooper, P.W.; Kipp, M.E.

    1995-07-01

    At the request of the U.S. Army Non-Stockpile Chemical Material Office, the Sandia Explosives Containment System Design Team investigated mature destruction systems for destroying recovered chemical warfare munitions (CWM). The goal of the investigations was to identify and examine available techniques for the destruction of recovered CWM. The result of this study is a recommendation for an interim solution, a solution for use on any munitions found while an optimal, long-term solution is developed. Sandia is also performing the long-term solution study to develop a system that destroys CWM, contains the blast and fragments, and destroys the chemical agent without insult to the environment.

  9. ORION II bus demonstration. Demonstration report (Final)

    SciTech Connect

    Shanley, J.

    1989-02-01

    The Central New York Regional Transportation Authority conducted an 18-month demonstration to determine how the ORION II bus operates in actual service. The ORION II vehicle is a small low floor, accessible heavy duty, diesel-powered transit bus designed to meet the needs of the elderly and handicapped. It has the capacity to seat 26 passengers with 4 wheelchair lockdowns. Side and rear doors are equipped with electrically powered ramps. Eight Thomas vehicles (22-foot, 11,500 lbs, wheelchair equipped, gasoline fueled) were also tested during the demonstration period. Operations (fuel and oil usage) and maintenance (scheduled and unscheduled) data were collected and charted-out in the report as well as driver, passenger, and maintenance surveys. This report provides descriptions, photographs, and comparison charts of both the diesel-fueled ORION II transit bus and the gasoline-fueled Thomas vehicles along with the demonstration test plan, evaluations, conclusions, and survey results.

  10. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  11. Evaluation of higher distribution and/or utilization voltages. Third interim report (October 1979): analysis of individual component cost and/or energy efficiencies

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the third task, Analysis of Individual Component Cost and/or Energy Efficiencies, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of both cost and energy loss models for the distribution and customer utilization system elements as well as the analysis of critical performance variables for the types of motors in end use elements, as a function of voltage level. The purpose of this task is to provide individual component cost and energy models which will be incorporated in the global system optimization program under Task 4. A major output of this task is a mathematical model for each component's cost and/or energy losses and a graphical representation of each model.

  12. Evaluation of gasification and gas cleanup processes for use in molten-carbonate fuel-cell power plants. Task B interim report

    SciTech Connect

    Not Available

    1981-12-01

    This interim report satisfies the Task B requirement for DOE Contract DE-AC21-81MC16220 to define process configurations for systems suitable for supplying fuel to molten carbonate fuel cells (MCFC) in industrial and utility power plants. The information and data necessary for this study were extracted from sources in the public domain, including reports from DOE, EPRI, and EPA; work sponsored in whole or in part by Federal agencies; and from trade journals, MCFC developers, and manufacturers. The configurations include entrained, fluidized-bed, gravitating-bed, and molten salt gasifiers, both air and oxygen blown. Desulfurization systems utilizing wet scrubbing processes, such as Selexol and Rectisol II, and dry sorbents, such as iron oxide and dolomite, were chosen for evaluation.

  13. Cataract surgery: interim results and complications of a randomised controlled trial. Oxford Cataract Treatment and Evaluation Team (OCTET).

    PubMed Central

    1986-01-01

    A randomised controlled trial in progress for more than five years, with no loss to follow-up (except death), assessed 333 eyes treated by three methods of cataract surgery. They were (A) intracapsular extraction and contact lens usage, (B) intracapsular extraction and implantation of an iris supported lens (Federov I), and (C) extracapsular extraction and implantation of an iridocapsular lens (Binkhorst 2-loop). The purpose of the paper is to report interim visual results, complications, and corneal endothelial cell loss. More eyes in groups A (contact lens) and C (extracapsular + implant) achieved better visual acuity than in group B (intracapsular + Federov lens), which also had more postoperative complications. Both implant groups lost more endothelial cells than the non-implant group, which did not differ significantly from group B before one year. PMID:2872913

  14. Testing and Treating Women after Unsuccessful Conservative Treatments for Overactive Bladder or Mixed Urinary Incontinence: A Model-Based Economic Evaluation Based on the BUS Study

    PubMed Central

    Barton, Pelham; Middleton, Lee J.; Deeks, Jonathan J.; Daniels, Jane P.; Latthe, Pallavi; Coomarasamy, Arri; Rachaneni, Suneetha; McCooty, Shanteela; Verghese, Tina S.; Roberts, Tracy E.

    2016-01-01

    Objective To compare the cost-effectiveness of bladder ultrasonography, clinical history, and urodynamic testing in guiding treatment decisions in a secondary care setting for women failing first line conservative treatment for overactive bladder or urgency-predominant mixed urinary incontinence. Design Model-based economic evaluation from a UK National Health Service (NHS) perspective using data from the Bladder Ultrasound Study (BUS) and secondary sources. Methods Cost-effectiveness analysis using a decision tree and a 5-year time horizon based on the outcomes of cost per woman successfully treated and cost per Quality-Adjusted Life-Year (QALY). Deterministic and probabilistic sensitivity analyses, and a value of information analysis are also undertaken. Results Bladder ultrasonography is more costly and less effective test-treat strategy than clinical history and urodynamics. Treatment on the basis of clinical history alone has an incremental cost-effectiveness ratio (ICER) of £491,100 per woman successfully treated and an ICER of £60,200 per QALY compared with the treatment of all women on the basis of urodynamics. Restricting the use of urodynamics to women with a clinical history of mixed urinary incontinence only is the optimal test-treat strategy on cost-effectiveness grounds with ICERs of £19,500 per woman successfully treated and £12,700 per QALY compared with the treatment of all women based upon urodynamics. Conclusions remained robust to sensitivity analyses, but subject to large uncertainties. Conclusions Treatment based upon urodynamics can be seen as a cost-effective strategy, and particularly when targeted at women with clinical history of mixed urinary incontinence only. Further research is needed to resolve current decision uncertainty. PMID:27513926

  15. BBIS: Beacon Bus Information System

    NASA Astrophysics Data System (ADS)

    Kasim, Shahreen; Hafit, Hanayanti; Pei Juin, Kong; Afizah Afif, Zehan; Hashim, Rathiah; Ruslai, Husni; Jahidin, Kamaruzzaman; Syafwan Arshad, Mohammad

    2016-11-01

    Lack of bus information for example bus timetable, status of the bus and messy advertisement on bulletin board at the bus stop will give negative impact to tourist. Therefore, a real-time update bus information bulletin board provides all information needed so that passengers can save their bus information searching time. Supported with Android or iOS, Beacon Bus Information System (BBIS) provides bus information between Batu Pahat and Kluang area. BBIS is a system that implements physical web technology and interaction on demand. It built on Backend-as-a-Service, a cloud solution and Firebase non relational database as data persistence backend and syncs between user client in the real-time. People walk through bus stop with smart device and do not require any application. Bluetooth Beacon is used to achieve smart device's best performance of data sharing. Intellij IDEA 15 is one of the tools that that used to develop the BBIS system. Multi-language included front end and backend supported Integration development environment (IDE) helped to speed up integration process.

  16. Evaluation of surface-based inversions from ERA-Interim and satellite data over Antarctica using dropsonde data from the 2010 Concordiasi Experiment

    NASA Astrophysics Data System (ADS)

    Boylan, Patrick; Wang, Junhong; Cohn, Steve; Hultberg, Tim; August, Thomas; Fetzer, Eric; Maddy, Eric; Wong, Sun

    2015-04-01

    Surface-based inversions (SBI), where atmospheric temperature increases with height from the surface, occur very frequently over Antarctica. SBIs play an important role in Antarctic climate; however, much less is known about the characteristics of SBIs over Antarctica than the Arctic. This is mainly due to the scarcity of upper and lower tropospheric observations over Antarctica. The Concordiasi field experiment provided unprecedented high quality meteorological profiles over Antarctica and the surrounding ocean, especially over the continent where satellite retrievals are challenging. Between September and December 2010, a total of 639 dropsondes soundings were obtained as part of Concordiasi. This study uses the SBIs derived from the Concordiasi high-resolution dropsonde data to evaluate SBI properties from ERA-Interim reanalysis and products from two hyper-spectral satellite instruments, the Advanced InfraRed Sounder (AIRS) and the Infrared Atmospheric Sounding Interferometer (IASI). All three products are operational and are available over the entire Antarctic region. Preliminary analyses reveal that with recently released versions of AIRS and IASI, occurrences of a SBI agree with the dropsonde data in ~80% of the cases. Analyses with AIRS and ERA-Interim conclude that surface air temperature, not vertical resolution, is the limiting factor in the ability to detect and characterize SBIs. We find SBIs to be more frequent, more intense, and deeper over the continent than over the surrounding ocean and sea ice. The results are very encouraging for future usage of satellite and reanalysis data to study Antarctic SBIs. If the three operational products are successfully validated, they will be used to study SBI variability beyond the time period of the Concordiasi campaign, including studying long-term SBI trends.

  17. Euro Data Bus

    SciTech Connect

    Engel, H.E.; Hall, J.R. II; Schrock, C.B.

    1995-12-31

    With the disintegration of the Soviet Union and the opening of the Iron Curtain, a downsizing of the Defense Establishment in the West is occurring, causing industry to look for opportunities where technology used for military applications can be applied to meet former East Block countries. Among these requirements has been the urgent desire of the people in former East Block countries for access to Western media which had been denied them, and has led to numerous opportunities for the implementation of Cable Television (CATV) systems. In addition, there are also requirements for utility metering for electricity, gas, water, heat, etc. which had previously been provided to the population by the Government at little or no cost. EWT of Augsburg, Germany, previously a subcontractor to ASEC on military security system projects, who has a subsidiary, TSS, which is a prominent CATV systems house, requested ASEC to provide a system which can provide utility meter reading and other control and monitoring services utilizing CATV. Working with CableBus Systems Corporation, a CATV data communications supplier and various utility meter manufacturers, ASEC, as the System Integrator, has developed a utilities monitoring system. This system. in cooperation with EWT, is being marketed and sold in Europe as EURO DATA BUS. This paper describes EURO DATA BUS and its applications, as well as the actual system designs for two pilot applications. One system is oriented at Utility Meter Reading and Demand side Management primarily, but will also be used to demonstrate other system capabilities such as security and fire alarm monitoring, etc. The design is therefore quite straightforward and {open_quotes}standard{close_quotes}. The second system has more of an industrial orientation and involves the monitoring and load control for a Municipal Electric Utility. While well within the capabilities of the system to accomplish, a more customized design was required to meet these requirements.

  18. Evaluation of tuff as a medium for a nuclear waste repository: interim status report on the properties of tuff

    SciTech Connect

    Johnstone, J.K.; Wolfsberg, K.

    1980-07-01

    This report is the second in a series of summary briefings to the National Academy of Science`s (NAS) Committee on Radioactive Waste Management dealing with feasibility of disposal of heat-producing radioactive waste in silicic tuff. The interim status of studies of tuff properties determined on samples obtained from Yucca Mountain and Rainier Mesa (G-tunnel) located on the Nevada Test Site (NTS) are discussed. In particular, progress is described on resolving issues identified during the first briefing to the NAS which include behavior of water in tuff when heated, the effect of the presence or absence of water and joints on the thermal/physical properties of tuff and the detailed/complex sorptive properties of highly altered and unaltered tuff. Initial correlations of thermal/physical and sorptive properties with the highly variable porosity and mineralogy are described. Three in-situ, at-depth field experiments, one nearly completed and two just getting underway are described. In particular, the current status of mineralogy and petrology, geochemistry, thermal and mechanical, radiation effects and water behavior studies are described. The goals and initial results of a Mine Design Working Group are discussed. Regional factors such as seismicity, volcanism and hydrology are not discussed.

  19. Evaluation of the Steel Creek ecosystem in relation to the proposed restart of the L-Reactor: interim report

    SciTech Connect

    Not Available

    1983-09-01

    This interim report of findings from studies by SREL has updated information on several key components of the Steel Creek ecosystem. We have emphasized two categories of the Steel Creek biota: Endangered Species (American alligator) and species for which environmental degradation within SRP boundaries might result in changes in offsite resource abundance. Wintering waterfowl surveys in the vicinity of the Steel Creek delta have demonstrated a pattern of increased utilization over the duration of these studies (1981-83). Wood stork utilization of SRP swamp areas also appeared to be substantially increased relative to previous years. Thermal alteration of the Steel Creek delta areas will eliminate this area as wood stork foraging habitat. Anadromous fish utilization of the Steel Creek area was also substantially increased in 1983 relative to 1982. The differences in anadromous fish species utilization patterns between 1982 and 1983 are probably a result of the markedly different river flow conditions between the two years. Studies of the American alligator have continued. No further reproduction by alligators has been observed in the Steel Creek system. 24 references, 14 figures, 13 tables.

  20. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  1. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    SciTech Connect

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document.

  2. Tennessee Minimum School Bus Standards.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, 2004

    2004-01-01

    The School Bus Specifications and Procedures adopted by the 2000 National Conference on School Transportation and the Federal Motor Vehicle Safety Standards (FMVSS) were used as guides by the Tennessee State Board of Education Pupil Transportation Advisory Committee in developing the revised minimum specifications for school bus chassis and school…

  3. Task Analysis Assessment on Intrastate Bus Traffic Controllers

    NASA Astrophysics Data System (ADS)

    Yen Bin, Teo; Azlis-Sani, Jalil; Nur Annuar Mohd Yunos, Muhammad; Ismail, S. M. Sabri S. M.; Tajedi, Noor Aqilah Ahmad

    2016-11-01

    Public transportation acts as social mobility and caters the daily needs of the society for passengers to travel from one place to another. This is true for a country like Malaysia where international trade has been growing significantly over the past few decades. Task analysis assessment was conducted with the consideration of cognitive ergonomic view towards problem related to human factors. Conducting research regarding the task analysis on bus traffic controllers had allowed a better understanding regarding the nature of work and the overall monitoring activities of the bus services. This paper served to study the task analysis assessment on intrastate bus traffic controllers and the objectives of this study include to conduct task analysis assessment on the bus traffic controllers. Task analysis assessment for the bus traffic controllers was developed via Hierarchical Task Analysis (HTA). There are a total of five subsidiary tasks on level one and only two were able to be further broken down in level two. Development of HTA allowed a better understanding regarding the work and this could further ease the evaluation of the tasks conducted by the bus traffic controllers. Thus, human error could be reduced for the safety of all passengers and increase the overall efficiency of the system. Besides, it could assist in improving the operation of the bus traffic controllers by modelling or synthesizing the existing tasks if necessary.

  4. Bus accident analysis of routes with/without bus priority.

    PubMed

    Goh, Kelvin Chun Keong; Currie, Graham; Sarvi, Majid; Logan, David

    2014-04-01

    This paper summarises findings on road safety performance and bus-involved accidents in Melbourne along roads where bus priority measures had been applied. Results from an empirical analysis of the accident types revealed significant reduction in the proportion of accidents involving buses hitting stationary objects and vehicles, which suggests the effect of bus priority in addressing manoeuvrability issues for buses. A mixed-effects negative binomial (MENB) regression and back-propagation neural network (BPNN) modelling of bus accidents considering wider influences on accident rates at a route section level also revealed significant safety benefits when bus priority is provided. Sensitivity analyses done on the BPNN model showed general agreement in the predicted accident frequency between both models. The slightly better performance recorded by the MENB model results suggests merits in adopting a mixed effects modelling approach for accident count prediction in practice given its capability to account for unobserved location and time-specific factors. A major implication of this research is that bus priority in Melbourne's context acts to improve road safety and should be a major consideration for road management agencies when implementing bus priority and road schemes.

  5. Evaluating Voltage Regulation Compliance of Mil-Pre-GCS600A(ARMY) for Vehicle On-Board Generators and Assessing Overall Vehicle Bus Compliance

    DTIC Science & Technology

    2012-08-01

    was a Permanent Magnet Synchronous Machine (PMSM). PMSM generators are being used for vehicle on-board electrical power generation because of their...system can be validated in the laboratory. However, determining overall vehicle electrical system compliance before prototype integration is more...can aid in optimization of the electrical system, i.e. vehicle bus capacitance sizing and allocation. Vehicle electrical system compliance can be

  6. Method for in-use measurement and evaluation of the activity, fuel use, electricity use, and emissions of a plug-in hybrid diesel-electric school bus.

    PubMed

    Choi, Hyung-Wook; Frey, H Christopher

    2010-05-01

    The purpose of this study is to demonstrate a methodology for characterizing at high resolution the energy use and emissions of a plug-in parallel-hybrid diesel-electric school bus (PHSB) to support assessments of sensitivity to driving cycles and comparisons to a conventional diesel school bus (CDSB). Data were collected using onboard instruments for a first-of-a-kind prototype PHSB and a CDSB of the same chassis and engine, operated on actual school bus routes. The engine load was estimated on the basis of vehicle specific power (VSP) and an empirically derived relationship between VSP and engine manifold absolute pressure (MAP). VSP depends on speed, acceleration, and road grade. For the PHSB, the observed electrical discharge or recharge to the traction motor battery was characterized on the basis of VSP. The energy use and emission rates of the PHSB from tailpipe and electricity use were estimated for five real-world driving cycles and compared to the engine fuel use and emissions of the CDSB. The PHSB had the greatest advantage on arterial routes and less advantage on highway or local routes. The coupled VSP-MAP modeling approach enables assessment of a wide variety of driving conditions and comparisons of vehicles with different propulsion technologies.

  7. Engineering evaluation/cost analysis for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri -- environment assessment

    SciTech Connect

    Picel, M H; Peterson, J M; Williams, M J

    1991-05-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures. 25 refs., 4 figs., 6 tabs.

  8. Engineering evaluation/cost analysis-environmental assessment for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri

    SciTech Connect

    Picel, M H; Peterson, J M; Williams, M J

    1992-03-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures.

  9. Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Viterna, Larry A.

    1997-01-01

    A government, industry, and university cooperative is developing an advanced hybrid electric city transit bus. Goals of this effort include doubling the fuel economy compared to current buses and reducing emissions to one-tenth of current EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors as an energy storage system, and a planned natural gas fueled turbogenerator developed from a small jet engine. Power from both the generator and energy storage system is provided to a variable speed electric motor attached to the rear axle. At over 15000 kg gross weight, this is the largest vehicle of its kind ever built using ultra-capacitor energy storage. This paper describes the overall power system architecture, the evolution of the control strategy, and its performance over industry standard drive cycles.

  10. Evaluation of Shear Strength Threshold of Concern for Retrieval of Interim-Stored K-Basin Sludge in the Hanford Site

    SciTech Connect

    Onishi, Yasuo; Yokuda, Satoru T.; Schmidt, Andrew J.

    2010-11-01

    K-Basin sludge will be recovered into the Sludge Transport and Storage Containers (STSCs) and will be stored in the T Plant for interim storage (at least 10 years). Long-term sludge storage tests conducted by Pacific Northwest National Laboratory show that high uranium content K Basin sludge can self-cement and form a strong sludge with a bulk shear strength of up to 65 kPa. Some of this sludge has "paste" and "chunks" with shear strengths of approximately 3~5 kPa and 380 ~ 770 kPa, respectively. High uranium content sludge samples subjected to hydrothermal testing (e.g., 185°C, 10 h) have been observed to form agglomerates with a shear strength up to 170 kPa. After interim storage at T Plant, the sludge in the STSCs will be mobilized by water jets impinging the sludge. The objective of the evaluation was to determine the range of sludge shear strength for which there is high confidence that a water-jet retrieval system can mobilize stored K-Basin sludge from STSCs. The shear strength at which the sludge can be retrieved is defined as the "shear strength threshold of concern." If the sludge shear strength is greater than the value of the shear strength threshold of concern, a water-jet retrieval system will be unlikely to mobilize the sludge up to the container’s walls. The shear strength threshold of concern can be compared with the range of possible shear strengths of K-Basin stored sludge to determine if the current post interim-storage, water-jet retrieval method is adequate. Fourteen effective cleaning radius (ECR) models were reviewed, and their validity was examined by applying them to Hanford 241-SY-101 and 241-AZ-101 Tanks to reproduce the measured ECR produced by the mixer pumps. The validation test identified that the Powell-3 and Crowe-2 ECR models are more accurate than other ECR models reviewed. These ECR models were used to address a question as to whether the effective cleaning radius of a water jet is sufficient or if it can be readily expanded

  11. Available Alternative Fuel School Bus Products--2004

    SciTech Connect

    Not Available

    2004-04-01

    This 4-page Clean Cities fact sheet provides a list of the currently available (and soon to be available) model year 2004 alternative fuel school bus and school bus engine products. It includes information from Blue Bird Corporation, Collins Bus Corporation, Corbeil Bus, Ford Motor Company, General Motors Corporation, Thomas Built Buses, Inc., Clean Air Partners, Cummins Westport, and Deere & Company.

  12. High-Speed Ring Bus

    NASA Technical Reports Server (NTRS)

    Wysocky, Terry; Kopf, Edward, Jr.; Katanyoutananti, Sunant; Steiner, Carl; Balian, Harry

    2010-01-01

    The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There

  13. 75 FR 74134 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... Federal Transit Administration State of Good Repair Bus and Bus Facilities Discretionary Program Funds AGENCY: Federal Transit Administration (FTA), DOT. ACTION: State of Good Repair Bus and Bus Facilities... Transit Administration (FTA) announces the selection of projects funded with Section 5309 Bus and...

  14. Evaluation of land surface model representation of phenology: an analysis of model runs submitted to the NACP Interim Site Synthesis

    NASA Astrophysics Data System (ADS)

    Richardson, A. D.; Nacp Interim Site Synthesis Participants

    2010-12-01

    Phenology represents a critical intersection point between organisms and their growth environment. It is for this reason that phenology is a sensitive and robust integrator of the biological impacts of year-to-year climate variability and longer-term climate change on natural systems. However, it is perhaps equally important that phenology, by controlling the seasonal activity of vegetation on the land surface, plays a fundamental role in regulating ecosystem processes, competitive interactions, and feedbacks to the climate system. Unfortunately, the phenological sub-models implemented in most state-of-the-art ecosystem models and land surface schemes are overly simplified. We quantified model errors in the representation of the seasonal cycles of leaf area index (LAI), gross ecosystem photosynthesis (GEP), and net ecosystem exchange of CO2. Our analysis was based on site-level model runs (14 different models) submitted to the North American Carbon Program (NACP) Interim Synthesis, and long-term measurements from 10 forested (5 evergreen conifer, 5 deciduous broadleaf) sites within the AmeriFlux and Fluxnet-Canada networks. Model predictions of the seasonality of LAI and GEP were unacceptable, particularly in spring, and especially for deciduous forests. This is despite an historical emphasis on deciduous forest phenology, and the perception that controls on spring phenology are better understood than autumn phenology. Errors of up to 25 days in predicting “spring onset” transition dates were common, and errors of up to 50 days were observed. For deciduous sites, virtually every model was biased towards spring onset being too early, and autumn senescence being too late. Thus, models predicted growing seasons that were far too long for deciduous forests. For most models, errors in the seasonal representation of deciduous forest LAI were highly correlated with errors in the seasonality of both GPP and NEE, indicating the importance of getting the underlying

  15. Evaluating a Systemic Reform Project at the School District Level. Interim Report for the Fresno Systemic Program.

    ERIC Educational Resources Information Center

    Calhoun, Dave

    Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…

  16. SCHOOL BUS GARAGES, 1966 REVISION.

    ERIC Educational Resources Information Center

    JOHNSON, HERBERT F.

    STANDARDS AND RECOMMENDATIONS ARE GIVEN FOR THE DESIGN AND CONSTRUCTION OF SCHOOL BUS GARAGES INCLUDING BRIEF DISCUSSIONS OF--(1) SITE DEVELOPMENT, (2) DESIGN AND CONSTRUCTION, AND (3) MECHANICAL (HEATING, PLUMBING, AND VENTILATION) AND ELECTRICAL FACTORS. (JT)

  17. The combined evaluation of interim contrast-enhanced computerized tomography (CT) and FDG-PET/CT predicts the clinical outcomes and may impact on the therapeutic plans in patients with aggressive non-Hodgkin's lymphoma.

    PubMed

    Yang, Deok-Hwan; Min, Jung-Joon; Jeong, Yong Yeon; Ahn, Jae-Sook; Kim, Yeo-Kyeoung; Cho, Sang-Hee; Chung, Ik-Joo; Bom, Hee-Seung; Kim, Hyeoung-Joon; Lee, Je-Jung

    2009-05-01

    We investigated the concomitant interim response of patients with aggressive non-Hodgkin's lymphoma (NHL) using multi-detector row computerized tomography (CT) and (18)F-fluoro-2-deoxy-D: -glucose-positron emission tomography (PET)/CT for prediction of clinical outcomes. One hundred six newly diagnosed patients with aggressive NHL were enrolled. Both the CT and PET/CT were serially performed at the time of diagnosis and after three to four cycles of chemotherapy (interim). The patients were categorized into four different responsive groups according to the interim PET/CT and CT: (1) complete metabolic response (CMR)-complete response unconfirmed (CRu), (2) CMR-partial response (PR), (3) partial metabolic response (PMR)-Cru, and (4) PMR-PR. Fifty-five patients with CMR-CRu, 20 patients with CMR-PR, seven patients with PMR-Cru, and 23 patients with PMR-PR were distributed. In addition, one patient experienced a disease progression. There was a significant difference in relapse rates between PET/CT-positive (67.3%) and PET/CT-negative patients (17.3%; P < 0.01). Also, there was a significant difference between patients with PMR-PR (32.0% and 26.1%) and CMR-CRu (89.3% and 80.0%) for 3-year overall survival (OS) and event-free survival (EFS), respectively. A multivariate analysis revealed that high international prognostic index (> or =3) at diagnosis, T-cell phenotype, and PMR-PR in interim PET/CT and CT were independent prognostic significances for OS. Moreover, bulky disease (>10 cm), T-cell phenotype, and PMR-PR showed significant associations for EFS. PMR-PR in interim response was the predictive prognostic determinant for both OS and EFS, with a hazard ratio of 3.93 (1.61-9.60) and 3.60 (1.62-7.98), respectively. The combined evaluation of interim PET/CT and CT was found to be a significant predictor of disease progression, OS, and EFS.

  18. A study of multiplex data bus techniques for the space shuttle

    NASA Technical Reports Server (NTRS)

    Kearney, R. J.; Kalange, M. A.

    1972-01-01

    A comprehensive technology base for the design of a multiplexed data bus subsystem is provided. Extensive analyses, both analytical and empirical, were performed. Subjects covered are classified under the following headings: requirements identification and analysis; transmission media studies; signal design and detection studies; synchronization, timing, and control studies; user-subsystem interface studies; operational reliability analyses; design of candidate data bus configurations; and evaluation of candidate data bus designs.

  19. Development and validation of a self-report measure of bus driver behaviour.

    PubMed

    Dorn, Lisa; Stephen, Lucy; af Wåhlberg, Anders; Gandolfi, Julie

    2010-12-01

    There are likely to be individual differences in bus driver behaviour when adhering to strict schedules under time pressure. A reliable and valid assessment of these individual differences would be useful for bus companies keen to mitigate risk of crash involvement. This paper reports on three studies to develop and validate a self-report measure of bus driver behaviour. For study 1, two principal components analyses of a pilot questionnaire revealed six components describing bus driver behaviour and four bus driver coping components. In study 2, test-retest reliability of the components were tested in a sub-sample and found to be adequate. Further, the 10 components were used to predict bus crash involvement at three levels of culpability with consistently significant associations found for two components. For study 3, avoidance coping was consistently associated with celeration variables in a bus simulator, especially for a time-pressured drive. STATEMENT OF RELEVANCE: The instrument can be used by bus companies for driver stress and fatigue management training to identify at-risk bus driver behaviour. Training to reduce the tendency to engage in avoidance coping strategies, improve evaluative coping strategies and hazard monitoring when under stress may improve bus driver safety.

  20. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethylether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operation in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work

  1. Ring Buffered Network Bus

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This report describes the research effort to demonstrate the integration of a data sharing technology, Ring Buffered Network Bus, in development by Dryden Flight Research Center, with an engine simulation application, the Java Gas Turbine Simulator, in development at the University of Toledo under a grant from the Glenn Research Center. The objective of this task was to examine the application of the RBNB technologies as a key component in the data sharing, health monitoring and system wide modeling elements of the NASA Aviation Safety Program (AVSP) [Golding, 1997]. System-wide monitoring and modeling of aircraft and air safety systems will require access to all data sources which are relative factors when monitoring or modeling the national airspace such as radar, weather, aircraft performance, engine performance, schedule and planning, airport configuration, flight operations, etc. The data sharing portion of the overall AVSP program is responsible for providing the hardware and software architecture to access and distribute data, including real-time flight operations data, among all of the AVSP elements. The integration of an engine code capable of numerically "flying" through recorded flight paths and weather data using a software tool that allows for distributed access of data to this engine code demonstrates initial steps toward building a system capable of monitoring and modeling the National Airspace.

  2. Online Education Interim Report

    ERIC Educational Resources Information Center

    Protopsaltis, Spiros, Ed.

    2007-01-01

    This interim report produced by the Colorado State Board of Education Online Education Task Force examines key issues related to online education. Task force members agree that: (1) online education has become a viable element of Colorado's public education system; (2) the role of technology in educating our children will continue to grow; and (3)…

  3. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  4. Interim treatment: Bridging delays to opioid treatment access

    PubMed Central

    Sigmon, Stacey C.

    2015-01-01

    Objective Despite the undisputed effectiveness of agonist maintenance for opioid dependence, individuals can remain on waitlists for months, during which they are at significant risk for morbidity and mortality. To mitigate these risks, the Food and Drug Administration in 1993 approved interim treatment, involving daily medication + emergency counseling only, when only a waitlist is otherwise available. We review the published research in the 20 years since the approval of interim opioid treatment. Methods A literature search was conducted to identify all randomized trials evaluating the efficacy of interim treatment for opioid-dependent patients awaiting comprehensive treatment. Results Interim opioid treatment has been evaluated in four controlled trials to date. In three, interim treatment was compared to waitlist or placebo control conditions and produced greater outcomes on measures of illicit opioid use, retention, criminality and likelihood of entry into comprehensive treatment. In the fourth, interim treatment was compared to standard methadone maintenance and produced comparable outcomes in illicit opioid use, retention and criminal activity. Conclusions Interim treatment significantly reduces patient and societal risks when conventional treatment is unavailable. Further research is needed to examine the generality of these findings, further enhance outcomes, and identify the patient characteristics which predict treatment response. PMID:25937593

  5. Analysis of bus passenger comfort perception based on passenger load factor and in-vehicle time.

    PubMed

    Shen, Xianghao; Feng, Shumin; Li, Zhenning; Hu, Baoyu

    2016-01-01

    Although bus comfort is a crucial indicator of service quality, existing studies tend to focus on passenger load and ignore in-vehicle time, which can also affect passengers' comfort perception. Therefore, by conducting surveys, this study examines passengers' comfort perception while accounting for both factors. Then, using the survey data, it performs a two-way analysis of variance and shows that both in-vehicle time and passenger load significantly affect passenger comfort. Then, a bus comfort model is proposed to evaluate comfort level, followed by a sensitivity analysis. The method introduced in this study has theoretical implications for bus operators attempting to improve bus service quality.

  6. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    SciTech Connect

    Nugent, John; Newsome, Todd; Nugent, Michael

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  7. Forecast analysis of optical waveguide bus performance

    NASA Technical Reports Server (NTRS)

    Ledesma, R.; Rourke, M. D.

    1979-01-01

    Elements to be considered in the design of a data bus include: architecture; data rate; modulation, encoding, detection; power distribution requirements; protocol, work structure; bus reliability, maintainability; interterminal transmission medium; cost; and others specific to application. Fiber- optic data bus considerations for a 32 port transmissive star architecture, are discussed in a tutorial format. General optical-waveguide bus concepts, are reviewed. The electrical and optical performance of a 32 port transmissive star bus, and the effects of temperature on the performance of optical-waveguide buses are examined. A bibliography of pertinent references and the bus receiver test results are included.

  8. An Evaluation of Three English Methodology Courses as Preparation for Teaching English in the Secondary School. Interim Report.

    ERIC Educational Resources Information Center

    Snider, June

    Evaluations of three English methodology courses at Bradley University, Illinois, were made to determine which course or combination of courses was most effective in preparing the student to teach English in the secondary school. Questionnaires completed by Bradley graduates teaching English in secondary schools indicated that none of the three…

  9. EVALUATION OF THE EFFECTIVENESS OF COATINGS IN REDUCING DISLODGEABLE ARSENIC, CHROMIUM, AND COPPER FROM CCA TREATED WOOD, INTERIM DATA REPORT

    EPA Science Inventory

    EPA is approximately 20 months into a project to evaluate the performance of wood coatings as a way to prevent arsenic, chromium and copper exposure from the surfaces of CCA treated wood. Potential dermal exposure, as measured by wipe sampling dislodgeable CCA chemical from wood ...

  10. Job Enrichment: Evaluation with Implications for Air Force Job Redesign. Interim Report, 1 January 1975-30 April 1977.

    ERIC Educational Resources Information Center

    Watson, Thomas W.; Zumbro, Patrick A.

    The main text of this report consists of a review and evaluation of job enrichment as an approach to job redesign, with implications for Air Force research and application. In addition, two appendixes are included: the first, a supplemental historical discussion; the second, a ninety-six-item annotated bibliography. Specific objectives are to…

  11. Evaluation of Worker Profiling and Reemployment Services Systems: Interim Report. Unemployment Insurance Occasional Paper 96-1.

    ERIC Educational Resources Information Center

    Hawkins, Evelyn K.; And Others

    The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…

  12. Grant Computer Managed Individualized Learning Project (PLAN*). The interim Evaluation Report (July 1, 1972-June 30, 1973).

    ERIC Educational Resources Information Center

    Saint Louis Board of Education, MO.

    Four instructional management programs, the Duluth Project, IGE Project, the IPI Project, and PLAN Project, were evaluated, contrasted, and compared with development of an inhouse program for the St. Louis public schools. The main criteria were: developmental and operational costs; degree of individualization; the use of behavioral objectives,…

  13. Interim Evaluation of the Pilot Program of the Truancy Case Management Partnership Intervention in the District of Columbia

    ERIC Educational Resources Information Center

    Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey

    2012-01-01

    The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…

  14. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the

  15. Effects of a Universally Free, In-Classroom School Breakfast Program: Results from the Second Year of the Maryland Meals for Achievement Evaluation. Interim Report.

    ERIC Educational Resources Information Center

    Murphy, J. Michael; Rankin, Emunah; Feeney, Kelly; Kenney, Leigh; Kleinman, Ron

    Noting that many children in the United States are not well nourished despite the recent economic boom, the state of Maryland began the Maryland Meals for Achievement (MMFA) program, a demonstration project to see if providing a classroom breakfast free to all students can improve student nutrition and academic achievement. This interim report…

  16. Aids to School Bus Design

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Navistar International Transportation Corporation, Chicago, IL, used three separate NASA-developed technologies in the design and testing of their 3000 Series Bus Chassis which was developed expressly for school bus applications. For structural analysis, they used the MSC/NASTRAN program which mathematically analyzes a design and predicts how it will hold up under stress. They also used the SPATE 9000 system for non-contact measurement of stress, load transfer mechanisms, detection of hidden flaws, and monitoring structural changes during fatigue testing. SPATE 9000 was based on infrared stress measurement technology developed by Langley Research Center. They also employed the Wyle Ride Quality Meter, which was developed by Langley to aid in passenger aircraft design by providing an accurate measurement of ride vibration and sound level. These numbers translate into a subjective discomfort level index. These technologies contribute to the company's 45-48 percent share of the school bus chassis market.

  17. Overview hazard analysis for the H2Fuel Bus Program

    SciTech Connect

    Hovis, G.L.

    1996-06-18

    The H2Fuel Bus project is a joint development effort to produce a safe, near-zero emission, 32 passenger bus that is propelled by electric power with continuous on-board hydrogen powered battery recharging. A key initiative in the hydrogen bus development effort is a rigorous evaluation of operational safety. Westinghouse Savannah River Co., the prime contractor at the Department of Energy`s Savannah River Site, has developed a hazard analysis methodology designed to provide a systematic, comprehensive identification and evaluation of hazards. Although originally developed to support nuclear/chemical facility safety basis documentation, the SRS Methodology has widespread applicability to operations and/or systems that utilize hazardous materials and energy. This methodology was used to perform an overview hazard analysis for the H2Fuel Bus project to focus attention on those hypothetical circumstances that pose the greatest threat to the populace and property. The hazard analysis yields a listing of all known H2Fuel Bus hazards, postulated accident scenarios describing possible hazardous releases or conditions, an assessment of the scenarios in terms of frequency of occurrence and consequence, and binning in frequency-consequence space to assess the relative severity of postulated scenarios.

  18. Effect of bus size and operation to crash occurrences.

    PubMed

    Chimba, Deo; Sando, Thobias; Kwigizile, Valerian

    2010-11-01

    This paper evaluates roadway and operational factors considered to influence crashes involving buses. Factors evaluated included those related to bus sizes and operation services. Negative binomial (NB) and multinomial logit (MNL) models were used in linearizing and quantifying these factors with respect to crash frequency and injury severities, respectively. The results showed that position of the bus travel lane, presence or absence of on-street shoulder parking, posted speed limit, lane width, median width, number of lanes per direction and number of vehicles per lane has a higher influence on bus crashes compared to other roadway and traffic factors. Wider lanes and medians were found to reduce probability of bus crashes while more lanes and higher volume per lane were found to increase the likelihood of occurrences of bus-related crashes. Roadways with higher posted speed limits excluding freeways were found to have high probability of crashes compared to low speed limit roadways. Buses traveling on the inner lanes and making left turns were found to have higher probability of crashes compared to those traveling on the right most lanes. The same factors were found to influence injury severity though with varying magnitudes compared to crash frequency.

  19. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  20. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., or other major propulsion system components may require advice from the bus manufacturer. All routine... braking. The bus should be accelerated at full throttle from a full stop to maximum safe speed on the... performance of the service, regenerative (if applicable), and parking brake systems should be evaluated at...

  1. 75 FR 23843 - Discretionary Bus and Bus Facilities Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... initiative. The SGR Bus initiative will make funds available to public transit providers to finance capital... Americans who depend on it daily. Transit not only provides mobility options for the American public, but... Highways, Bridges, and Transit Conditions and Performance Report to Congress, over 36 percent of urban...

  2. Implementation and adoption of nationwide electronic health records in secondary care in England: qualitative analysis of interim results from a prospective national evaluation

    PubMed Central

    Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate

    2010-01-01

    Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting

  3. Data Bus Adapts to Changing Traffic Level

    NASA Technical Reports Server (NTRS)

    Lew, Eugene; Deruiter, John; Varga, Mike

    1987-01-01

    Access becomes timed when collisions threaten. Two-mode scheme used to grant terminals access to data bus. Causes bus to alternate between random accessibility and controlled accessibility to optimize performance and adapt to changing data-traffic conditions. Bus is part of 100-Mb/s optical-fiber packet data system.

  4. The NASA bus communications listening device software

    NASA Technical Reports Server (NTRS)

    Allen, M. A.

    1979-01-01

    The development of the bus listener is presented. Special software was developed to control the 'bus interface units' (BIU) connecting each of these devices to a communications cable to form the bus communication network. The code used in the BTU is described.

  5. "Don't Miss the Bus!"

    ERIC Educational Resources Information Center

    Lieberth, Jane A.

    1999-01-01

    Presents observations from the director of the National Association of Pupil Transportation concerning school bus safety, seat belts, and the state of the $15-billion school transportation industry. Increasing student use of bus transportation and delivering the school bus safety message to all concerned are addressed. (GR)

  6. Computer-Based Exercises in Anemia and Chest Pain Diagnosis: An Interim Evaluation of the PlanAlyzer Project

    PubMed Central

    Lyon, Harold C.; Healy, James C.; Bell, James R.; O'Donnell, Joseph F.; Hirai, Frank; Moore-West, Margaret; Cornwell, Gibbons G.; Brooks, W. Blair; Spackman, Kent A.; Beck, J. Robert

    1990-01-01

    PlanAlyzer is a microcomputer-based, self-paced, case-based, event-driven system for medical education. Aimed at the second year medical student, PlanAlyzer presents cases, elicits and critiques a student's approach to the diagnosis of two common medical disorders: anemias and chest pain. PlanAlyzer uses text, hypertext, images and critiquing theory. Students were randomized, one half becoming the experimental group who received the interactive PlanAlyzer cases in anemia, the other half becoming the controls who received the exact same content material in a text format. Later in each year there was a crossover, the controls becoming the experimentals for a similar intervention with the cardiology PlanAlyzer cases. Preliminary results at the end of the first two trials shows that the programs have achieved most of the proposed instructional objectives, plus some significant efficiency and economy gains. 96 faculty hours of classroom time were saved by using PlanAlyzer in their place, while, maintaining high student achievement. In terms of student proficiency and efficiency, the 176 students in the trial were able to accomplish the project's instructional objectives, and the experimentals accomplished this in less time than the controls. The research suggests additional inquiry in several areas: better evaluation instruments to measure the problem solving skills PlanAlyzer was designed to teach; use of hypertext PlanAlyzer cases to find if such a mode results in performance and/or efficiency differences; through the addition of interactive video, broaden PlanAlyzer to include additional behaviors subsumed under the topic of clinical problem solving, such as patient management strategies and the role of patients' affective behavior and non-verbal cues in the data gathering process.

  7. Evaluation of interim and final waste forms for the newly generated liquid low-level waste flowsheet

    SciTech Connect

    Abotsi, G.M.K.; Bostick, D.T.; Beck, D.E.

    1996-05-01

    The purpose of this review is to evaluate the final forms that have been proposed for radioactive-containing solid wastes and to determine their application to the solid wastes that will result from the treatment of newly generated liquid low-level waste (NGLLLW) and Melton Valley Storage Tank (MVST) supernate at the Oak Ridge National Laboratory (ORNL). Since cesium and strontium are the predominant radionuclides in NGLLLW and MVST supernate, this review is focused on the stabilization and solidification of solid wastes containing these radionuclides in cement, glass, and polymeric materials-the principal waste forms that have been tested with these types of wastes. Several studies have shown that both cesium and strontium are leached by distilled water from solidified cement, although the leachabilities of cesium are generally higher than those of strontium under similar conditions. The situation is exacerbated by the presence of sulfates in the solution, as manifested by cracking of the grout. Additives such as bentonite, blast-furnace slag, fly ash, montmorillonite, pottery clay, silica, and zeolites generally decrease the cesium and strontium release rates. Longer cement curing times (>28 d) and high ionic strengths of the leachates, such as those that occur in seawater, also decrease the leach rates of these radionuclides. Lower cesium leach rates are observed from vitrified wastes than from grout waste forms. However, significant quantities of cesium are volatilized due to the elevated temperatures required to vitrify the waste. Hence, vitrification will generally require the use of cleanup systems for the off-gases to prevent their release into the atmosphere.

  8. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    SciTech Connect

    Mays, Gary T; Belles, Randy; Cetiner, Sacit M; Howard, Rob L; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A; Peterson, Steven K; Scaglione, John M

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  9. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2011-02-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm-2, ERA-Interim overestimates the ISR by 10 Wm-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  10. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2010-09-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 26%. A GPCP-corrected version of ERA-Interim is less biased (10-15%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6-8 W m-2, ERA-Interim overestimates the ISR by 9-10 W m-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  11. Pybus -- A Python Software Bus

    SciTech Connect

    Lavrijsen, Wim T.L.P.

    2004-10-14

    A software bus, just like its hardware equivalent, allows for the discovery, installation, configuration, loading, unloading, and run-time replacement of software components, as well as channeling of inter-component communication. Python, a popular open-source programming language, encourages a modular design on software written in it, but it offers little or no component functionality. However, the language and its interpreter provide sufficient hooks to implement a thin, integral layer of component support. This functionality can be presented to the developer in the form of a module, making it very easy to use. This paper describes a Pythonmodule, PyBus, with which the concept of a ''software bus'' can be realized in Python. It demonstrates, within the context of the ATLAS software framework Athena, how PyBus can be used for the installation and (run-time) configuration of software, not necessarily Python modules, from a Python application in a way that is transparent to the end-user.

  12. HERMES travels by CAN bus

    NASA Astrophysics Data System (ADS)

    Waller, Lewis G.; Shortridge, Keith; Farrell, Tony J.; Vuong, Minh; Muller, Rolf; Sheinis, Andrew I.

    2014-07-01

    The new HERMES spectrograph represents the first foray by AAO into the use of commercial off-the-shelf industrial field bus technology for instrument control, and we regard the final system, with its relatively simple wiring requirements, as a great success. However, both software and hardware teams had to work together to solve a number of problems integrating the chosen CANopen/CAN bus system into our normal observing systems. A Linux system running in an industrial PC chassis ran the HERMES control software, using a PCI CAN bus interface connected to a number of distributed CANopen/CAN bus I/O devices and servo amplifiers. In the main, the servo amplifiers performed impressively, although some experimentation with homing algorithms was required, and we hit a significant hurdle when we discovered that we needed to disable some of the encoders used during observations; we learned a lot about how servo amplifiers respond when their encoders are turned off, and about how encoders react to losing power. The software was based around a commercial CANopen library from Copley Controls. Early worries about how this heavily multithreaded library would work with our standard data acquisition system led to the development of a very low-level CANopen software simulator to verify the design. This also enabled the software group to develop and test almost all the control software well in advance of the construction of the hardware. In the end, the instrument went from initial installation at the telescope to successful commissioning remarkably smoothly.

  13. Interim Assessments: A User's Guide

    ERIC Educational Resources Information Center

    Marshall, Kim

    2008-01-01

    Interim assessments are hot in American schools. Also called benchmark or periodic tests, these assessments are given every four to nine weeks to check on students' progress. Although interim assessments are an important tool for school improvement, they are easy to misuse. In the author's work coaching principals in a number of districts, he has…

  14. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  15. Analysis of robustness of urban bus network

    NASA Astrophysics Data System (ADS)

    Tao, Ren; Yi-Fan, Wang; Miao-Miao, Liu; Yan-Jie, Xu

    2016-02-01

    In this paper, the invulnerability and cascade failures are discussed for the urban bus network. Firstly, three static models(bus stop network, bus transfer network, and bus line network) are used to analyse the structure and invulnerability of urban bus network in order to understand the features of bus network comprehensively. Secondly, a new way is proposed to study the invulnerability of urban bus network by modelling two layered networks, i.e., the bus stop-line network and the bus line-transfer network and then the interactions between different models are analysed. Finally, by modelling a new layered network which can reflect the dynamic passenger flows, the cascade failures are discussed. Then a new load redistribution method is proposed to study the robustness of dynamic traffic. In this paper, the bus network of Shenyang City which is one of the biggest cities in China, is taken as a simulation example. In addition, some suggestions are given to improve the urban bus network and provide emergency strategies when traffic congestion occurs according to the numerical simulation results. Project supported by the National Natural Science Foundation of China (Grant Nos. 61473073, 61374178, 61104074, and 61203329), the Fundamental Research Funds for the Central Universities (Grant Nos. N130417006, L1517004), and the Program for Liaoning Excellent Talents in University (Grant No. LJQ2014028).

  16. Transforming Writing: Interim Evaluation Report

    ERIC Educational Resources Information Center

    Rooke, Jonathan

    2012-01-01

    Transforming Writing is a two-year action research project which aims to develop a model for the teaching and learning of writing that more fully incorporates a focus on embedded formative assessment. In the first year of the project, the 12 participating schools developed a model of writing underpinned by Talk for Writing, an approach developed…

  17. Electrical system architecture having high voltage bus

    DOEpatents

    Hoff, Brian Douglas [East Peoria, IL; Akasam, Sivaprasad [Peoria, IL

    2011-03-22

    An electrical system architecture is disclosed. The architecture has a power source configured to generate a first power, and a first bus configured to receive the first power from the power source. The architecture also has a converter configured to receive the first power from the first bus and convert the first power to a second power, wherein a voltage of the second power is greater than a voltage of the first power, and a second bus configured to receive the second power from the converter. The architecture further has a power storage device configured to receive the second power from the second bus and deliver the second power to the second bus, a propulsion motor configured to receive the second power from the second bus, and an accessory motor configured to receive the second power from the second bus.

  18. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  19. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Bureau of Indian Affairs Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines... publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements... of 2010. Three Interim Model Deputation Agreements will be used: one agreement for tribes in...

  20. 49 CFR 1182.7 - Interim approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Interim approval. 1182.7 Section 1182.7....7 Interim approval. (a) A party may request interim approval of the operation of the properties... additional filing fee is required, whether the request for interim approval is included in the application...

  1. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in...

  2. School Bus Safety.

    ERIC Educational Resources Information Center

    Stroup, Karen Bruner; And Others

    1991-01-01

    Equipment to allow safe transportation of disabled children is reviewed. Such equipment includes infant car seats, child safety seats, safety vests, and accommodations for children in casts and/or braces. Five principles for evaluation and selection of safe seating options are given as are safety rules and information on standards and resources.…

  3. PinBus Interface Design

    SciTech Connect

    Hammerstrom, Donald J.; Adgerson, Jewel D.; Sastry, Chellury; Pratt, Richard M.; Pratt, Robert G.

    2009-12-30

    On behalf of the U.S. Department of Energy, PNNL has explored and expanded upon a simple control interface that might have merit for the inexpensive communication of smart grid operational objectives (demand response, for example) to small electric end-use devices and appliances. The approach relies on bi-directional communication via the electrical voltage states of from one to eight shared interconnection pins. The name PinBus has been suggested and adopted for the proposed interface protocol. The protocol is defined through the presentation of state diagrams and the pins’ functional definitions. Both simulations and laboratory demonstrations are being conducted to demonstrate the elegance and power of the suggested approach. PinBus supports a very high degree of interoperability across its interfaces, allowing innumerable pairings of devices and communication protocols and supporting the practice of practically any smart grid use case.

  4. Fabrication of an Implant-Supported Fixed Interim Prosthesis Using a Duplicate Denture: An Alternative Technique.

    PubMed

    Al-Thobity, Ahmad M

    2016-06-22

    The fabrication of an implant-supported fixed complete denture prosthesis involves multiple clinical and laboratory steps. One of the main steps is to provide the patient with an interim fixed prosthesis to evaluate the patient's esthetic and functional needs as well as to enhance the patient's psychology before proceeding to the definitive prosthesis. Different techniques for fabricating interim prostheses have been described in the literature. This report describes an alternative technique that uses a duplicate denture made of self-curing acrylic resin to fabricate an implant-supported fixed interim prosthesis. The interim prosthesis was later used as a blueprint for the definitive implant-supported hybrid prosthesis.

  5. Avionic Data Bus Integration Technology

    DTIC Science & Technology

    1991-12-01

    address the hardware-software interaction between a digital data bus and an avionic system. Very Large Scale Integration (VLSI) ICs and multiversion ...the SCP. In 1984, the Sperry Corporation developed a fault tolerant system which employed multiversion programming, voting, and monitoring for error... MULTIVERSION PROGRAMMING. N-version programming. 226 N-VERSION PROGRAMMING. The independent coding of a number, N, of redundant computer programs that

  6. 75 FR 5847 - Section 5309 Bus and Bus Facilities Livability Initiative and Urban Circulator Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... Federal Transit Administration Section 5309 Bus and Bus Facilities Livability Initiative and Urban Circulator Program Grants AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice to Extend.... SUMMARY: The Federal Transit Administration (FTA) announced on December 8, 2009, the availability...

  7. Just Right Vehicle Network (Data Bus) Protocols

    DTIC Science & Technology

    2011-03-16

    this network to research; however, I shall concentrate on defining a precise method to define and assist in properly selecting the network (data bus...recommended – Simple Mathematical selection method used Vehicle Network Selection Conducted 2003-2005 – CAN Data Bus recommended for lower speed hard...real time control – IEEE 1394b Data Bus recommended for high speed hard real time control – Formal Trade Study Process w/ software assisted method used

  8. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  9. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  10. COMPARISON OF PARALLEL AND SERIES HYBRID POWERTRAINS FOR TRANSIT BUS APPLICATION

    SciTech Connect

    Gao, Zhiming; Daw, C Stuart; Smith, David E; Jones, Perry T; LaClair, Tim J; Parks, II, James E

    2016-01-01

    The fuel economy and emissions of both conventional and hybrid buses equipped with emissions aftertreatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicate that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar CO and HC tailpipe emissions but were also predicted to have reduced NOx tailpipe emissions compared to the conventional bus in higher speed cycles. For the New York bus cycle (NYBC), which has the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus, while the parallel hybrid bus had significantly lower tailpipe emissions. All three bus powertrains were found to require periodic active DPF regeneration to maintain PM control. Plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed due to the relatively large battery capacity that is typical of the series hybrid configuration.

  11. Comparison of Parallel and Series Hybrid Power Trains for Transit Bus Applications

    DOE PAGES

    Gao, Zhiming; Daw, C. Stuart; Smith, David E.; ...

    2016-08-01

    The fuel economy and emissions of conventional and hybrid buses equipped with emissions after treatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicated that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar carbon monoxide and hydrocarbon tailpipe emissions but were also predicted to have reduced tailpipe emissions of nitrogen oxides compared with the conventional bus in higher speed cycles. For the New York bus cycle, which hasmore » the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus; the parallel hybrid bus had significantly lower tailpipe emissions. All three bus power trains were found to require periodic active diesel particulate filter regeneration to maintain control of particulate matter. Finally, plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed because of the relatively large battery capacity that is typical of the series hybrid configuration.« less

  12. Comparison of Parallel and Series Hybrid Power Trains for Transit Bus Applications

    SciTech Connect

    Gao, Zhiming; Daw, C. Stuart; Smith, David E.; LaClair, Tim J.; Parks, James E.; Jones, Perry T.

    2016-08-01

    The fuel economy and emissions of conventional and hybrid buses equipped with emissions after treatment were evaluated via computational simulation for six representative city bus drive cycles. Both series and parallel configurations for the hybrid case were studied. The simulation results indicated that series hybrid buses have the greatest overall advantage in fuel economy. The series and parallel hybrid buses were predicted to produce similar carbon monoxide and hydrocarbon tailpipe emissions but were also predicted to have reduced tailpipe emissions of nitrogen oxides compared with the conventional bus in higher speed cycles. For the New York bus cycle, which has the lowest average speed among the cycles evaluated, the series bus tailpipe emissions were somewhat higher than they were for the conventional bus; the parallel hybrid bus had significantly lower tailpipe emissions. All three bus power trains were found to require periodic active diesel particulate filter regeneration to maintain control of particulate matter. Finally, plug-in operation of series hybrid buses appears to offer significant fuel economy benefits and is easily employed because of the relatively large battery capacity that is typical of the series hybrid configuration.

  13. Interim dentures and treatment dentures.

    PubMed

    Smith, D E

    1984-04-01

    Improvement in the interim denture procedure in the past decade has been one of the significant advancements in prosthodontic practice. The interim denture approach is only slightly more time-consuming and expensive than the conventional immediate denture approach, yet it has many advantages. Among those advantages are the following: (1) allows rapid results; (2) results in a higher quality definitive denture; (3) allows the surgical treatment to be performed during one appointment; (4) permits duplication of the natural tooth position; and (5) provides the patient with a spare denture after the definitive denture is completed. An interim denture technique was described that utilized a flexible layered silicone mold to form the replaced teeth. The interim denture procedure is flexible and lends itself to many variations in technique to meet unusual clinical situations. An interim removable partial denture technique was described that involves block-out of undesirable undercuts and duplication of the master cast for fabrication of the partial denture. This technique results in an interim partial denture that can be placed with little or no adjustment and that will provide better service for those who require it. Three simple procedures for fabricating treatment dentures were described and the indications for each were discussed. Although treatment dentures are not often used, they are essential for the dentist who is treating difficult patients who require complete dentures.

  14. Evaluation of Cloud Physical Properties of ECMWF Analysis and Re-Analysis (ERA-40 and ERA Interim) against CERES Tropical Deep Convective Cloud Object Observations

    NASA Technical Reports Server (NTRS)

    Xu, Kuan-Man

    2008-01-01

    This study presents an approach that converts the vertical profiles of grid-averaged cloud properties from large-scale models to probability density functions (pdfs) of subgrid-cell cloud physical properties measured at satellite footprints. Cloud physical and radiative properties, rather than just cloud and precipitation occurrences, of assimilated cloud systems by the European Center for Medium-range Weather Forecasts (ECMWF) operational analysis (EOA) and ECMWF Re-Analyses (ERA-40 and ERA Interim) are validated against those obtained from Earth Observing System satellite cloud object data for January-August 1998 and March 2000 periods. These properties include ice water path (IWP), cloud-top height and temperature, cloud optical depth and solar and infrared radiative fluxes. Each cloud object, a contiguous region with similar cloud physical properties, is temporally and spatially matched with EOA and ERA-40 data. Results indicate that most pdfs of EOA and ERA-40 cloud physical and radiative properties agree with those of satellite observations of the tropical deep convective cloud-object type for the January-August 1998 period. There are, however, significant discrepancies in selected ranges of the cloud property pdfs such as the upper range of EOA cloud top height. A major discrepancy is that the dependence of the pdfs on the cloud object size for both EOA and ERA-40 is not as strong as in the observations. Modifications to the cloud parameterization in ECMWF that occurred in October 1999 eliminate the clouds near the tropopause but shift power of the pdf to lower cloud-top heights and greatly reduce the ranges of IWP and cloud optical depth pdfs. These features persist in ERA-40 due to the use of the same cloud parameterizations. The downgrade of data assimilation technique and the lack of snow water content information in ERA-40, not the coarser horizontal grid resolution, are also responsible for the disagreements with observed pdfs of cloud physical

  15. A new bus lane on urban expressway with no-bay bus stop

    NASA Astrophysics Data System (ADS)

    Tian, Zhao; Jia, Limin

    2016-01-01

    The sharp increase in residents and vehicles causes heavy traffic pressure in many cities. To ease traffic congestion, it has been the common sense that we should develop public transit system. The priority of the bus appears particularly necessary with the rapid development of the public transport system. The bus lane is an important embodiment of the bus priority. Focusing on the problem of the unreasonable dedicated bus lane (DBL) under the lower ratio of buses, this paper proposed a new bus lane with limited physical length. And this bus lane can reduce the lane-changing conflict caused by the buses and cars running on roads without bus lanes. Based on the cellular automata (CA) traffic flow model and the lane-changing behavior of the vehicle including the optional lane-changing and the mandatory lane-changing, a three-lane traffic model with an isolated no-bay bus stop is proposed. The ordinary three-lane traffic without a bus lane and the cases of traffic with a DBL or the proposed bus lane are simulated, and the comparisons in the form of the fundamental diagrams are made among them. It is shown that the no-bay bus stop can act as a bottleneck on the traffic flow because of the mandatory lane-changing behavior. Under a certain ratio of the bus number to the total vehicles number, (1) the traffic with the proposed bus lane has less lane-changing conflict and can provide higher traffic capacity than the ordinary traffic without a bus lane, (2) compared with the DBL, the proposed bus lane is advantageous in easing congestion on the ordinary lanes when the traffic flow is high and can avoid unreasonable allocation of the road resources.

  16. Bus Stops and Pedestrian-Motor Vehicle Collisions in Lima, Peru: A Matched Case-Control Study

    PubMed Central

    Quistberg, D. Alex; Koepsell, Thomas D.; Johnston, Brian D.; Boyle, Linda Ng; Miranda, J. Jaime; Ebel, Beth E.

    2015-01-01

    Objective To evaluate the relationship between bus stop characteristics and pedestrian-motor vehicle collisions. Design Matched case-control study where the units of study were pedestrian crossing. Setting Random sample of 11 police commissaries in Lima, Peru. Data collection occurred from February, 2011 to September, 2011. Participants 97 intersection cases representing 1,134 collisions and 40 mid-block cases representing 469 collisions that occurred between October, 2010 and January, 2011 and their matched controls. Main Exposures Presence of a bus stop and specific bus stop characteristics. Main Outcome Occurrence of a pedestrian-motor vehicle collision. Results Intersections with bus stops were three times more likely to have a pedestrian-vehicle collision (OR 3.28, 95% CI 1.53-7.03), relative to intersections without bus stops. Both formal and informal bus stops were associated with a higher odds of a collision at intersections (OR 6.23, 95% CI 1.76-22.0 and OR 2.98, 1.37-6.49). At mid-block sites, bus stops on a bus-dedicated transit lane were also associated with collision risk (OR 2.36, 95% CI 1.02-5.42). All bus stops were located prior to the intersection, contrary to practices in most high income countries. Conclusions In urban Lima, the presence of a bus stop was associated with a three-fold increase in risk of a pedestrian collision. The highly competitive environment among bus companies may provide an economic incentive for risky practices such as dropping off passengers in the middle of traffic and jockeying for position with other buses. Bus stop placement should be considered to improve pedestrian safety. PMID:24357516

  17. Connecting Separate Computers to a Common Bus

    NASA Technical Reports Server (NTRS)

    Agrawan, A. K.; Mullen, P. G.; Vadakan, V. V.

    1984-01-01

    Network bus adapter (NBA) handles protocols for computer-tocomputer communications. NBA does all protocol handling and communications with bus for its host computer, that processor of different speeds sends data to each other continuously at maximum speed. Any host can communicate with any other, or several or with all.

  18. California's Bus Driver's Training Course. Instructor's Manual.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    This instructor's manual was designed to help graduates of the California Bus Driver Instructor Course provide effective instruction to school bus driver trainees. It contains enough material for 20-30 hours of classroom training. The information is organized in 12 instructional units that cover the following topics: introduction to the course;…

  19. Hiding Solar-Array Bus Bars

    NASA Technical Reports Server (NTRS)

    Hufnagel, W. F.

    1983-01-01

    End terminals mounted under cells, maximizing usable illuminated area. Reconfigured solar panel bus bars placed under cells, reducing portion of module area not occupied by active silicon. Underside of last cell in string of cells serves as contact for positive bus. Negative tab of last cell in string is wrapped around from top of cell. Tabs are connected to output boards mounted under cells.

  20. Controlling Multiple Registers on a Computer Bus

    NASA Technical Reports Server (NTRS)

    Brokl, Stanley S.

    1987-01-01

    Number of addressable registers increased. Monitoring and controlling interface circuit expands capabilities of DR11-C (or equivalent) input/output port for computer that communicates with peripheral equipment via UNIBUS (or equivalent) data bus. Using only three address locations on bus, unit enables any number of external registers to be addressed, read, or written.

  1. Hidden Savings in your Bus Budget

    ERIC Educational Resources Information Center

    Newby, Ruth

    2005-01-01

    School transportation industry statistics show the annual average costs for operating and maintaining a single school bus range from $34,000 to $38,000. Operating a school bus fleet at high efficiency has a real impact on the dollars saved for a school district and the reliability of transportation service to students. In this article, the author…

  2. School Bus Maintenance. Bulletin, 1948, No. 2

    ERIC Educational Resources Information Center

    Featherston, E. Glenn

    1948-01-01

    This bulletin is one in the series on pupil transportation issued by the Office of Education. Its purpose is to furnish information and guidance for local school administrators and others who are concerned with school bus maintenance. Programs of school bus maintenance vary among the 48 States. Presumably all contract vehicles are maintained by…

  3. Neurosimulation modeling of a scheduled bus route

    SciTech Connect

    Lee, S.G.; Khoo, L.P.

    1997-05-01

    In a densely built-up urban society, operators of public bus services are faced with the recurrent problem of providing timely and reliable service. Wile they have no control over dynamically changing extraneous factors (such as passenger loads or road conditions) that may suddenly degrade the quality of the service provided, it is nonetheless desirable for management to study the extent to which these factors affect their business, and what measures, if any, can be adopted to neutralize them. This paper discusses how a simulation model of a bus route, embellished by a neural network, was created to model the historical pattern of the inputs (namely, passenger loads and road conditions) that affect the overall scheduled terminus-to-terminus time. Thus, in a case study of a bus route running from a suburb to the city center, it was found that the neurosimulation model could predict the cumulative terminus-to-terminus times better than a conventional simulation model could. A software module, embedded into the neurosimulation model for the purposes of speed regulation, was able to minimize the deviation of the bus service from schedule. When intentional delays were further introduced into the bus route, it was discovered that the speed regulator was more effective the longer the delay, and the further the bus traveled into the bus route. There is potential in applying neural computing in a dynamic bus scheduling problem such as the one discussed here.

  4. Priority Queuing On A Parallel Data Bus

    NASA Technical Reports Server (NTRS)

    Wallis, D. E.

    1985-01-01

    Queuing strategy for communications along shared data bus minimizes number of data lines while always assuring user of highest priority given access to bus. New system handles up to 32 user demands on 17 data lines that previously serviced only 17 demands.

  5. Determinants of exposure to fine particulate matter (PM 2.5) for waiting passengers at bus stops

    NASA Astrophysics Data System (ADS)

    Hess, Daniel Baldwin; Ray, Paul David; Stinson, Anne E.; Park, JiYoung

    2010-12-01

    This research evaluates commuter exposure to particulate matter during pre-journey commute segments for passengers waiting at bus stops by investigating 840 min of simultaneous exposure levels, both inside and outside seven bus shelters in Buffalo, New York. A multivariate regression model is used to estimate the relation between exposure to particulate matter (PM 2.5 measured in μg m -3) and three vectors of determinants: time and location, physical setting and placement, and environmental factors. Four determinants have a statistically significant effect on particulate matter: time of day, passengers' waiting location, land use near the bus shelter, and the presence of cigarette smoking at the bus shelter. Model results suggest that exposure to PM 2.5 inside a bus shelter is 2.63 μg m -3 (or 18 percent) higher than exposure outside a bus shelter, perhaps due in part to the presence of cigarette smoking. Morning exposure levels are 6.51 μg m -3 (or 52 percent) higher than afternoon levels. Placement of bus stops can affect exposure to particulate matter for those waiting inside and outside of shelters: air samples at bus shelters located in building canyons have higher particulate matter than bus shelters located near open space.

  6. Interprocessor bus switching system for simultaneous communication in plural bus parallel processing system

    DOEpatents

    Atac, R.; Fischler, M.S.; Husby, D.E.

    1991-01-15

    A bus switching apparatus and method for multiple processor computer systems comprises a plurality of bus switches interconnected by branch buses. Each processor or other module of the system is connected to a spigot of a bus switch. Each bus switch also serves as part of a backplane of a modular crate hardware package. A processor initiates communication with another processor by identifying that other processor. The bus switch to which the initiating processor is connected identifies and secures, if possible, a path to that other processor, either directly or via one or more other bus switches which operate similarly. If a particular desired path through a given bus switch is not available to be used, an alternate path is considered, identified and secured. 11 figures.

  7. Interprocessor bus switching system for simultaneous communication in plural bus parallel processing system

    DOEpatents

    Atac, Robert; Fischler, Mark S.; Husby, Donald E.

    1991-01-01

    A bus switching apparatus and method for multiple processor computer systems comprises a plurality of bus switches interconnected by branch buses. Each processor or other module of the system is connected to a spigot of a bus switch. Each bus switch also serves as part of a backplane of a modular crate hardware package. A processor initiates communication with another processor by identifying that other processor. The bus switch to which the initiating processor is connected identifies and secures, if possible, a path to that other processor, either directly or via one or more other bus switches which operate similarly. If a particular desired path through a given bus switch is not available to be used, an alternate path is considered, identified and secured.

  8. GeoBus: sharing science research with schools

    NASA Astrophysics Data System (ADS)

    Roper, Kathryn; Robinson, Ruth; Moorhouse, Ben

    2016-04-01

    GeoBus (www.geobus.org.uk) is an educational outreach project that was developed in 2012 by the Department of Earth and Environmental Sciences at the University of St Andrews, and it is currently sponsored by industry, NERC, The Crown Estate, and the Scottish Government. The aims of GeoBus are to support the teaching of Earth Science in secondary (middle and high) schools by providing teaching support to schools that have little or no experience in teaching this subject. This is, in part, done through the sharing of new science research outcomes and the experiences of young researchers with school pupils to provide a bridge between industry, higher education institutions, research councils and schools. Since its launch, over 40,000 pupils will have been involved in experiential Earth science learning activities in 190 different schools (over 400 separate visits) across the length and breadth of Scotland: many of these schools are in remote and disadvantaged regions. A new GeoBus project is under development within the Department of Earth Sciences at UCL in London. A key aim of GeoBus is to incorporate new research into our workshops with the main challenge being the development of appropriate resources that incorporate the key learning aims and requirements of the science and geography curricula. GeoBus works closely with researchers, teachers and educational practitioners to tailor the research outcomes to the curricula as much as possible. Over the past four years, GeoBus has developed 17 workshops, 5 challenge events and extensive field trips and each of these activities are trialled and evaluated within the university, and adjustments are made before the activities are delivered in schools. Activities are continually reviewed and further developments are made in response to both teacher and pupil feedback. This critical reflection of the project's success and impact is important to insure a positive and significant contribution to the science learning in

  9. Characterisation of an urban bus network for environmental purposes.

    PubMed

    André, Michel; Villanova, André

    2004-12-01

    Since pollutant emissions are closely related to the operating conditions of vehicles, their evaluation usually involves studying these operating conditions (through bus instrumentation and monitoring under actual operation), the design of representative driving or engine test cycles and the measurement of pollutant emissions. A preliminary characterisation of the routes on a bus network should make it possible to identify typical routes, the driving conditions and pollutant emissions of which are then studied. Two approaches are envisaged and applied to the Paris area, for which a wealth of information is available, which should be transferable to other bus networks. Both approaches are based on factorial analysis and automatic clustering, to allow optimum description and the identification of a pertinent typology of the bus routes in several classes. The first attempt at characterisation is based on statistics relating to bus operations: route characteristics (length, dedicated bus lanes, number of stops, location of stops: schools, tourist sites, hospitals, railways or underground stations), travel time, commercial speed, annual statistics (number of passengers, number of vehicles per hour, total kilometres), the irregularity of travel (variation of travel times, injuries, congestion.), as well as information on the problems encountered (congestion, distribution of the passenger load, junctions, bends). A second approach is based on the analysis of the "urban context" in which buses are driven. Population, employment, housing, road network, traffic and places that generate or disturb traffic (schools, railway stations, shopping areas, etc.) are calculated for the Ile de France region, by cells of 100 x 100 m, and collected in a geographical information system (GIS). Statistical analyses enable a typology of these urban cells to be established, the main parameters being density, type of housing, road types and traffic levels. The bus routes are then analysed

  10. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  11. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites: Final report

    SciTech Connect

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs.

  12. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  13. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  14. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  15. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  16. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance...

  17. 20 CFR 801.202 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Interim appointments. 801.202 Section 801.202... Members of the Board § 801.202 Interim appointments. (a) Acting Chairman. In the event that the Chairman... such time as the Secretary of Labor designates an Acting Chairman. (b) Interim members. In the...

  18. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44... § 7.44 Interim relief. (a) When the Department appeals and the case involves removal, separation, or... outcome of the Department appeal. The employee may decline the offer of interim relief. (b) Service...

  19. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  20. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use...

  1. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine...) The Judge will order interim action under paragraph (a) of this section, only after finding that...

  2. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim reports. 908.5 Section 908.5... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a... Administrator, not later than 45 days thereafter, an interim report setting forth as of such date...

  3. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  4. 12 CFR 268.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks... REGARDING EQUAL OPPORTUNITY Remedies and Enforcement § 268.505 Interim relief. (a)(1) When the Board appeals... offer of interim relief. (2) Service under the temporary or conditional restoration provisions...

  5. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days following the receipt of the HMO's or CMP's final interim cost and enrollment reports, CMS will make...

  6. 19 CFR 354.8 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim sanctions. 354.8 Section 354.8 Customs... VIOLATION OF AN ANTIDUMPING OR COUNTERVAILING DUTY ADMINISTRATIVE PROTECTIVE ORDER § 354.8 Interim sanctions... a final decision is rendered, that interim sanctions are necessary to protect the interests of...

  7. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim sanctions. 356.18 Section 356.18 Customs... Undertaking § 356.18 Interim sanctions. (a) If the Deputy Under Secretary concludes, after issuing a charging letter under § 356.16 and before a final decision is rendered, that interim sanctions are necessary...

  8. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  9. 29 CFR 1614.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Interim relief. 1614.505 Section 1614.505 Labor Regulations... OPPORTUNITY Remedies and Enforcement § 1614.505 Interim relief. (a)(1) When the agency appeals and the case... interim relief. (2) Service under the temporary or conditional restoration provisions of paragraph...

  10. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  11. 32 CFR 776.82 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Interim suspension. 776.82 Section 776.82... Complaint Processing Procedures § 776.82 Interim suspension. (a) Where the Rules Counsel determines there is... interim suspension, pending completion of a professional responsibility investigation. The...

  12. Analog bus driver and multiplexer

    NASA Technical Reports Server (NTRS)

    Pain, Bedabrata (Inventor); Hancock, Bruce (Inventor); Cunningham, Thomas J. (Inventor)

    2012-01-01

    For a source-follower signal chain, the ohmic drop in the selection switch causes unacceptable voltage offset, non-linearity, and reduced small signal gain. For an op amp signal chain, the required bias current and the output noise rises rapidly with increasing the array format due to a rapid increase in the effective capacitance caused by the Miller effect boosting up the contribution of the bus capacitance. A new switched source-follower signal chain circuit overcomes limitations of existing op-amp based or source follower based circuits used in column multiplexers and data readout. This will improve performance of CMOS imagers, and focal plane read-out integrated circuits for detectors of infrared or ultraviolet light.

  13. Study of the Voluntary Public School Choice Program. Interim Report

    ERIC Educational Resources Information Center

    Yin, Robert K.; Ahonen, Pirkko; Kim, Dawn

    2007-01-01

    The purpose of the Voluntary Public School Choice (VPSC) Program is to assist states and local school districts in the development of innovative strategies to expand options for students, and to encourage transfers of students from low-performing to higher-performing schools. This report presents interim findings from the National Evaluation of…

  14. Service use and costs for Medicare beneficiaries in risk-based HMOs and CMPs: some interim results from the National Medicare Competition Evaluation.

    PubMed Central

    Rossiter, L F; Nelson, L M; Adamache, K W

    1988-01-01

    The Health Care Financing Administration (HCFA) initiated the Medicare Competition Demonstration in 1982 in anticipation of congressional intent to establish a national program. Interim results on the 1984 service use and cost experience of the health maintenance organizations (HMOs) and competitive medical plans (CMPs) participating in the demonstrations indicate that Medicare enrollees in the demonstration experienced a median of 1,951 hospital days per 1,000 person years, 57 per cent of the median of 3,432 days per 1,000 in the local markets from which the plans drew enrollment. Independent practice association (IPA) HMOs experienced higher hospital use rates than staff and group model HMOs. These comparisons are not adjusted for various risk factors, the absence of which were likely to favor the demonstration plans. Plans with lower hospital service use were federally qualified and had been operating for more than five years. The median total annual revenue per enrollee across all plans was $2,312, compared to median annual expenses per enrollee of $2,250. The distribution of median annual expenses per enrollee by major category of expense was: institutional expenses ($1,038/enrollee), medical expenses ($720/enrollee), supplemental services expenses ($154/enrollee), and administrative and other expenses ($295/enrollee). Future analysis, using beneficiary-level data, will examine the impact of the demonstration and the nature and extent of evident biased selection and will compare the quality of care in the demonstrations to that in the fee-for-service sector. PMID:3291622

  15. Radiation-Tolerant Dual Data Bus

    NASA Technical Reports Server (NTRS)

    Kinstler, Gary A.

    2007-01-01

    An architecture, and a method of utilizing the architecture, have been proposed to enable error-free operation of a data bus that includes, and is connected to, commercial off-the-shelf (COTS) circuits and components that are inherently susceptible to singleevent upsets [SEUs (bit flips caused by impinging high-energy particles and photons)]. The architecture and method are applicable, more specifically, to data-bus circuitry based on the Institute for Electrical and Electronics Engineers (IEEE) 1394b standard for a high-speed serial bus.

  16. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Motor bus operation. 935.138 Section 935.138... REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a motor bus on Wake Island shall— (a) Keep its doors closed while the bus is moving with passengers on...

  17. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Motor bus operation. 935.138 Section 935.138... REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a motor bus on Wake Island shall— (a) Keep its doors closed while the bus is moving with passengers on...

  18. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  19. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  20. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Motor bus operation. 935.138 Section 935.138... REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a motor bus on Wake Island shall— (a) Keep its doors closed while the bus is moving with passengers on...

  1. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  2. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  3. 49 CFR 605.19 - Approval of school bus operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Approval of school bus operations. 605.19 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.19 Approval of school bus operations. (a) The Administrator will consider the comments filed by private school...

  4. Effect of periodic inflow on speed-controlled shuttle bus

    NASA Astrophysics Data System (ADS)

    Nagatani, Takashi

    2017-03-01

    We investigate the dynamic behavior of a shuttle bus controlled the speed when passengers come periodically at the origin. We propose the nonlinear-map model for the dynamics of the speed-controlled bus with the periodic inflow. The bus schedule is closely connected to the motion. The motion of the speed-controlled bus is affected by the periodic inflow. The motion of the shuttle bus depends highly on both speed control and periodic inflow. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions by varying both periodic inflow and speed control. We clarify the dependence of the bus motion on both speed control and periodic inflow.

  5. Effect of speedup delay on shuttle bus schedule

    NASA Astrophysics Data System (ADS)

    Nagatani, Takashi

    2016-10-01

    We study the bus schedule in the shuttle bus transportation system controlled by speedup. The bus schedule is closely related to the dynamic motion of the bus. The motion of a shuttle bus depends on the inflow rate of passengers and the delayed speedup control. The delayed speedup control has an important effect on the dynamic motion of the bus. We present the delayed map model for the dynamics of the shuttle bus with the delayed speedup control. The bus motion changes from a stable state, through a periodic state, to a quasi-periodic state by the delayed speedup control. The return map of the tour time displays a smooth closed curve and the bus motion is quasi-periodic. The dynamic transition to the quasi-periodic motion changes greatly with the delay time. We clarify the effect of the delayed speedup control on the bus schedule.

  6. Revocation of Office of Generic Drug's interim policy statement on inactive ingredients. Food and Drug Administration, HHS. Notice.

    PubMed

    1999-04-30

    The Food and Drug Administration (FDA) is revoking an interim policy statement on inactive ingredients in parenteral, ophthalmic, otic, and topical generic drug products (Interim Inactive Ingredient Policy). These generic drug products are the subjects of abbreviated new drug applications (ANDA's). The Interim Inactive Ingredient Policy was issued as a memorandum from the Acting Director of the Center for Drug Evaluation and Research's (CDER's) Office of Generic Drugs, FDA, to CDER's Associate Director for Science and Medical Affairs, FDA. FDA is taking this action because the Interim Inactive Ingredient Policy no longer represents current agency policy.

  7. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  8. The Impact on Traffic Safety in Bus Stop

    NASA Astrophysics Data System (ADS)

    Zhang, Kailun; Guang, Xiaoping; Qian, Yongsheng

    The article improves the attraction of public transportation system when the safety is taken into account during the selection of bus stops. In this paper, the characteristics of traffic conflict at bus stops is analyzed from various types of bus stops and the applicability of bus stations is proposed in comply with provisions of security. It has a certain reference value on selection of bus stops.

  9. An Interconnect Bus Power Optimization Method

    NASA Astrophysics Data System (ADS)

    En, Yun-Fei; Zhu, Zhang-Ming; Hao, Yue

    2010-07-01

    A simple yet accurate interconnect parasitical capacitance model is presented. Based on this model a novel interconnect bus optimization methodology is proposed. Combining wire spacing with wire ordering, this methodology focuses on bus dynamic power optimization with consideration of bus performance requirements. The optimization methodology is verified under a 65 nm technology node and it shows that with 50% slack in the routing space, a 33.03% power saving can be provided by the proposed optimization methodology for an intermediate video bus compared to the 27.68% power saving provided by uniform spacing technology. The proposed methodology is especially suitable for computer-aided design of nanometer scale on-chip buses.

  10. Collection Analysis Project. Interim Report.

    ERIC Educational Resources Information Center

    Collier, Carol; And Others

    This interim report of the University of Wyoming's Collection Analysis Project, whose purpose is to examine the university library's collection development process and make workable recommendations for process improvement, consists of a brief history of the library's collection, including a review of the evolution of the collection development…

  11. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule.

  12. Primer for the Interim Chair

    ERIC Educational Resources Information Center

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  13. Project Canada West. Interim Report.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    This first interim report of project Canada West, initiated in April, 1970, includes three papers. "Curriculum Development in Urbanization," by Dr. R. H. Sabey, Acting Executive Director, is an overview of the Project's history, purpose, and the 5 year plan for phases of research development. (See SO 000 283 for complete abstract.) Two…

  14. A software bus for thread objects

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Li, Dehuai

    1995-01-01

    The authors have implemented a software bus for lightweight threads in an object-oriented programming environment that allows for rapid reconfiguration and reuse of thread objects in discrete-event simulation experiments. While previous research in object-oriented, parallel programming environments has focused on direct communication between threads, our lightweight software bus, called the MiniBus, provides a means to isolate threads from their contexts of execution by restricting communications between threads to message-passing via their local ports only. The software bus maintains a topology of connections between these ports. It routes, queues, and delivers messages according to this topology. This approach allows for rapid reconfiguration and reuse of thread objects in other systems without making changes to the specifications or source code. A layered approach that provides the needed transparency to developers is presented. Examples of using the MiniBus are given, and the value of bus architectures in building and conducting simulations of discrete-event systems is discussed.

  15. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem

    PubMed Central

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods. PMID:26176764

  16. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods.

  17. Research development and demonstration of a fuel cell/battery powered bus system

    NASA Astrophysics Data System (ADS)

    Romano, S.; Wimmer, R.

    1993-02-01

    During 1992, the design of the three test bed buses evolved. Georgetown participated in all the working meetings and the preliminary design review of the Test Bed Bus (TBB). Throughout the Year, Georgetown provided input on system design and integration issues, transit industry requirements, and bus performance. GU also attended technical seminars, presenting papers at two. The computer simulation 'HYBRID', developed by Georgetown, was used to assess performance of different bus designs and system control algorithms. GU also modified the simulation to be more flexible and allow easier evaluation of designs. Georgetown had Exhibitgroup design and construct, to our specifications, a fuel cell bus display with a 1/10 scale model of the TBB for use at trade shows and exhibits. Energy Partners of West Palm Beach, Florida completed their subcontract for the engineering design study of a hydrogen fueled, fuel-cell-powered multi-passenger vehicle. Georgetown performed a study to determine the size of the US bus fleet and expected new bus deliveries over the next 10 years. Trojan Battery Company of Santa Fe Springs, California conducted a study to determine the specific design characteristics required of a lead acid battery to meet the special requirements posed by hybrid vehicle operation. Finally, GU assisted the prime contractor with the design of the system controller and its control algorithms.

  18. Fuel cell transit bus development & commercialization programs at Gerogetown University

    SciTech Connect

    Wimmer, R.; Larkins, J.; Romano, S.

    1996-12-31

    Fourteen years ago, Georgetown University (GU) perceived the need for a clean, efficient power systems for transportation that could operate on non-petroleum based fuels. The transit bus application was selected to begin system development. GU recognized the range and recharge constraints of a pure battery powered transit bus. A Fuel Cell power system would circumvent these limitations and, with an on board reformer, accommodate liquid fuel for rapid refueling. Feasibility studies for Fuel Cell power systems for transit buses were conducted with the Los Alamos National Laboratory in 1983. Successful results of this investigation resulted in the DOT/DOE Fuel Cell transit bus development program. The first task was to prove that small Fuel Cell power plants were possible. This was achieved with the Phase I development of two 25 kW Phosphoric Acid Fuel Cell (PAFC) brassboard systems. A liquid cooled version was selected for the Phase II activity in which three 30-foot Fuel Cell powered Test Bed Buses (TBBs) were fabricated. The first of these TBBs was delivered in the spring of 1994. All three of these development vehicles are now in Phase III of the program to conduct testing and evaluation, is conducting operational testing of the buses. The test will involve two fuel cell-operated buses; one with a proton exchange fuel cell and the other with a phosphoric acid fuel cell.

  19. Violence against metropolitan bus drivers and fare collectors in Brazil

    PubMed Central

    Assunção, Ada Ávila; de Medeiros, Adriane Mesquita

    2015-01-01

    OBJECTIVE To analyze the correlation between sociodemographic factors and working conditions of bus workers in a metropolitan area and violence against them. METHODS This cross-sectional study used a nonprobabilistic sample estimated according to the number of workers employed in bus companies located in three cities in the Belo Horizonte metropolitan region in 2012 (N = 17,470). Face-to-face interviews were conducted using a digital questionnaire. The factors associated with violence were analyzed in two stages using Poisson regression, according to each level. The magnitude of the association was evaluated using prevalence ratios with robust variance and a statistical significance of 5%, and 95% confidence intervals were obtained. RESULTS The study sample comprised 782 drivers and 691 fare collectors; 45.0% participants reported at least one act of violence in the workplace in the last 12 months, with passengers being predominantly responsible. The age of the bus workers was inversely associated with violence. Chronic diseases, sickness absenteeism, and working conditions were also associated with violence. CONCLUSIONS The findings on the correlation between violence and working conditions are essential for implementing prevention strategies by transportation service managers. PMID:25741657

  20. 41 CFR 101-29.204 - Interim Federal specification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal... PRODUCT DESCRIPTIONS 29.2-Definitions § 101-29.204 Interim Federal specification. An interim Federal... agencies. Interim amendments to Federal Specifications and amendments to interim Federal specifications...

  1. From Testing to Teaching: The Use of Interim Assessments in Classroom Instruction. CPRE Research Report # RR-65

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…

  2. Immobilized High Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report 2nd Generation Implementing Architecture

    SciTech Connect

    CALMUS, R.B.

    2000-09-14

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document.

  3. Dynamic Bus Travel Time Prediction Models on Road with Multiple Bus Routes

    PubMed Central

    Bai, Cong; Peng, Zhong-Ren; Lu, Qing-Chang; Sun, Jian

    2015-01-01

    Accurate and real-time travel time information for buses can help passengers better plan their trips and minimize waiting times. A dynamic travel time prediction model for buses addressing the cases on road with multiple bus routes is proposed in this paper, based on support vector machines (SVMs) and Kalman filtering-based algorithm. In the proposed model, the well-trained SVM model predicts the baseline bus travel times from the historical bus trip data; the Kalman filtering-based dynamic algorithm can adjust bus travel times with the latest bus operation information and the estimated baseline travel times. The performance of the proposed dynamic model is validated with the real-world data on road with multiple bus routes in Shenzhen, China. The results show that the proposed dynamic model is feasible and applicable for bus travel time prediction and has the best prediction performance among all the five models proposed in the study in terms of prediction accuracy on road with multiple bus routes. PMID:26294903

  4. 76 FR 68819 - State of Good Repair Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ...] [FR Doc No: 2011-28774] DEPARTMENT OF TRANSPORTATION Federal Transit Administration State of Good Repair Bus and Bus Facilities Discretionary Program Funds AGENCY: Federal Transit Administration (FTA.... SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces...

  5. Dynamic Bus Travel Time Prediction Models on Road with Multiple Bus Routes.

    PubMed

    Bai, Cong; Peng, Zhong-Ren; Lu, Qing-Chang; Sun, Jian

    2015-01-01

    Accurate and real-time travel time information for buses can help passengers better plan their trips and minimize waiting times. A dynamic travel time prediction model for buses addressing the cases on road with multiple bus routes is proposed in this paper, based on support vector machines (SVMs) and Kalman filtering-based algorithm. In the proposed model, the well-trained SVM model predicts the baseline bus travel times from the historical bus trip data; the Kalman filtering-based dynamic algorithm can adjust bus travel times with the latest bus operation information and the estimated baseline travel times. The performance of the proposed dynamic model is validated with the real-world data on road with multiple bus routes in Shenzhen, China. The results show that the proposed dynamic model is feasible and applicable for bus travel time prediction and has the best prediction performance among all the five models proposed in the study in terms of prediction accuracy on road with multiple bus routes.

  6. Sexual Harassment on the School Bus: Supporting and Preparing Bus Drivers to Respond Appropriately

    ERIC Educational Resources Information Center

    Allen, Melissa; Young, Ellie L.; Ashbaker, Betty Y.; Heaton, Emily; Parkinson, Marisa

    2003-01-01

    Sexual harassment is commonplace in schools, particularly among adolescents. Although information on this topic is typically gathered from students and teachers, this study collected information from school bus drivers. Based on feedback from 58 school bus drivers, 39 (67%) reported observing students making sexual comments or jokes. Almost half…

  7. Bullying and Aggression on the School Bus: School Bus Drivers' Observations and Suggestions

    ERIC Educational Resources Information Center

    deLara, Ellen

    2008-01-01

    Every school day bus drivers are responsible for transporting children safely over many miles, yet they are rarely polled for their opinions or contributions to school safety. School bus drivers are in a unique position to inform the discussion on aggressive behavior during the school day. This exploratory study collected information from school…

  8. School Bus and School Pupil Activity Bus Inspection and Maintenance Guide.

    ERIC Educational Resources Information Center

    Sowash, Fred W.

    This publication deals with suggested maintenance standards that apply to vehicles used for pupil transportation in California and covers all the safety-related systems that are common to most buses. The guide has been prepared to help all school bus and school pupil activity bus operators set up an inspection and preventive maintenance program…

  9. High-Resolution Dynamical Downscaling of ERA-Interim Using the WRF Regional Climate Model for the Area of Poland. Part 1: Model Configuration and Statistical Evaluation for the 1981-2010 Period

    NASA Astrophysics Data System (ADS)

    Kryza, Maciej; Wałaszek, Kinga; Ojrzyńska, Hanna; Szymanowski, Mariusz; Werner, Małgorzata; Dore, Anthony J.

    2017-02-01

    In this work, we present the results of high-resolution dynamical downscaling of air temperature, relative humidity, wind speed and direction, for the area of Poland, with the Weather Research and Forecasting (WRF) model. The model is configured using three nested domains, with spatial resolution of 45 km × 45 km, 15 km × 15 km and 5 km × 5 km. The ERA-Interim database is used for boundary conditions. The results are evaluated by comparison with station measurements for the period 1981-2010. The model is capable of reproducing the main climatological features of the study area. The results are in very close agreement with the measurements, especially for the air temperature. For all four meteorological variables, the model performance captures seasonal and daily cycles. For the air temperature and winter season, the model underestimates the measurements. For summer, the model shows higher values, compared with the measurements. The opposite is the case for relative humidity. There is a strong diurnal pattern in mean error, which changes seasonally. The agreement with the measurements is worse for the seashore and mountain areas, which suggests that the 5 km × 5 km grid might still have an insufficient spatial resolution. There is no statistically significant temporal trend in the model performance. The larger year-to-year changes in the model performance, e.g. for the years 1982 and 2010 for the air temperature should therefore be linked with the natural variability of meteorological conditions.

  10. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  11. Realization and optimization of bus bar current transducers based on Hall effect sensors

    NASA Astrophysics Data System (ADS)

    Blagojević, Marjan; Jovanović, Uglješa; Jovanović, Igor; Mančić, Dragan; Popović, Radivoje S.

    2016-06-01

    In this paper the realization and optimization of two coreless open-loop bus bar current transducers based on a Hall effect sensor are presented. Two types of bus bar are evaluated: flat rectangular and rectangular with a restrictive region in the middle. Both realized transducers are capable of measuring AC and DC currents up to 300 A and 10 kHz frequency with nonlinearity less than 0.3% in the entire range. Several methods for resolving issues with the skin effect and stray magnetic fields are presented along with the experimental test results. Some of the presented methods are novel and have never been evaluated.

  12. Factors affecting the probability of bus drivers being at-fault in bus-involved accidents.

    PubMed

    Goh, Kelvin; Currie, Graham; Sarvi, Majid; Logan, David

    2014-05-01

    Previous research has provided little insight into factors that influence the probability of bus drivers being at-fault in bus-involved accidents. In this study, an analysis was conducted on accident data compiled by a bus company that include an assessment on whether the bus driver was deemed by the company to hold primary responsibility for accident occurrence. Using a mixed logit modelling approach, roadway/environmental, vehicle and driver related variables that were identified to be influential were road type, speed limit, traffic/lighting conditions, bus priority, bus age/length and driver's age/gender/experience/historic at-fault accident record. Results were indicative of possible confined road-space issues that bus drivers face along routes with roadside traffic friction and point to the provision of exclusive right of way for buses as a possible way to address this. Results also suggest benefits in assigning routes comprising mainly divided roads as well as newer and shorter buses to less experienced drivers.

  13. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  14. Risk factors affecting fatal bus accident severity: Their impact on different types of bus drivers.

    PubMed

    Feng, Shumin; Li, Zhenning; Ci, Yusheng; Zhang, Guohui

    2016-01-01

    While the bus is generally considered to be a relatively safe means of transportation, the property losses and casualties caused by bus accidents, especially fatal ones, are far from negligible. The reasons for a driver to incur fatalities are different in each case, and it is essential to discover the underlying risk factors of bus fatality severity for different types of drivers in order to improve bus safety. The current study investigates the underlying risk factors of fatal bus accident severity to different types of drivers in the U.S. by estimating an ordered logistic model. Data for the analysis are retrieved from the Buses Involved in Fatal Accidents (BIFA) database from the USA for the years 2006-2010. Accidents are divided into three levels by counting their equivalent fatalities, and the drivers are classified into three clusters by the K-means cluster analysis. The analysis shows that some risk factors have the same impact on different types of drivers, they are: (a) season; (b) day of week; (c) time period; (d) number of vehicles involved; (e) land use; (f) manner of collision; (g) speed limit; (h) snow or ice surface condition; (i) school bus; (j) bus type and seating capacity; (k) driver's age; (l) driver's gender; (m) risky behaviors; and (n) restraint system. Results also show that some risk factors only have impact on the "young and elder drivers with history of traffic violations", they are: (a) section type; (b) number of lanes per direction; (c) roadway profile; (d) wet road surface; and (e) cyclist-bus accident. Notably, history of traffic violations has different impact on different types of bus drivers.

  15. The crew activity planning system bus interface unit

    NASA Technical Reports Server (NTRS)

    Allen, M. A.

    1979-01-01

    The hardware and software designs used to implement a high speed parallel communications interface to the MITRE 307.2 kilobit/second serial bus communications system are described. The primary topic is the development of the bus interface unit.

  16. Lightweight power bus for a baseload nuclear reactor in space

    NASA Astrophysics Data System (ADS)

    Massie, Lowell D.; Hoffman, Dennis J.; Oberly, Charles E.

    Metallic superconductors requiring refrigeration in the range of 4 to 10 K are of no benefit to the baseload space power system bus because the refrigeration and insulation constraints are too severe. The ceramic superconductors that can operate in the range of 20 to 100 K alleviate a great deal of the refrigeration problem and can compete with conventional hot bus distribution systems on the basis of mass for a bus exceeding a few meters in length. The ultimate benefit of the superconducting bus to the space power system will not be the mass savings. The great benefit of the superconducting bus will be the enormous reduction in bus voltage requirements due to the zero voltage drop along the bus. Low bus voltage (less than 100 Vdc) will permit a conventional dielectric insulation technology to be utilized as baseload powers are forced above 10 kW on spacecraft.

  17. 214. RUSTIC BUS SHELTER, GUARDRAILS AND LAMP POST BELLE HAVEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    214. RUSTIC BUS SHELTER, GUARDRAILS AND LAMP POST BELLE HAVEN BUS STOP WIDENING, 1932. - George Washington Memorial Parkway, Along Potomac River from McLean to Mount Vernon, VA, Mount Vernon, Fairfax County, VA

  18. 24. DETAIL INTERIOR VIEW OF GENERATOR BUS POTENTIAL FOR UNIT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. DETAIL INTERIOR VIEW OF GENERATOR BUS POTENTIAL FOR UNIT NO 1 IN BUS CELL GALLERY ON LEVEL +77 OF POWERHOUSE #1. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. Bus training for developmentally disabled adults.

    PubMed

    Robinson, D; Griffith, J; McComish, K; Swasbrook, K

    1984-07-01

    The effectiveness of a program combining classroom and community training in the teaching of bus-riding skills to developmentally disabled adults. These skills were taught sequentially using questions about a slide presentation, role playing, and performance in the natural environment. The experimental design was based upon the work of Neef, Iwata, and Page (1978). Test trials were conducted after each phase of training. Results showed that all subjects learned the necessary bus-riding skills and maintained their performance throughout the follow-up period of at least 1 year. The combination training method proved to be efficient and cost effective.

  20. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    SciTech Connect

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Andre L. Boehman; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The laboratory studies have included work with a Navistar V-8 turbodiesel engine, demonstration of engine operation on DME-diesel blends and instrumentation for evaluating fuel properties. The field studies have involved performance, efficiency and emissions measurements with the Champion Motorcoach ''Defender'' shuttle bus which will be converted to DME-fueling. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have completed engine combustion studies on DME-diesel blends up to 30 wt% DME addition.

  1. Staying Safe in the Car and on the Bus

    MedlinePlus

    ... in the Operating Room? Staying Safe in the Car and on the Bus KidsHealth > For Kids > Staying Safe in the Car and on the Bus A A A What's ... re probably getting there by riding in a car or a school bus. Most kids spend some ...

  2. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Identification-bus and driver. 374.317 Section 374.317 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...—bus and driver. Each bus and driver providing service shall be identified in a manner visible...

  3. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Identification-bus and driver. 374.317 Section 374.317 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...—bus and driver. Each bus and driver providing service shall be identified in a manner visible...

  4. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Identification-bus and driver. 374.317 Section 374.317 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...—bus and driver. Each bus and driver providing service shall be identified in a manner visible...

  5. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Identification-bus and driver. 374.317 Section 374.317 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...—bus and driver. Each bus and driver providing service shall be identified in a manner visible...

  6. 49 CFR 374.317 - Identification-bus and driver.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Identification-bus and driver. 374.317 Section 374.317 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...—bus and driver. Each bus and driver providing service shall be identified in a manner visible...

  7. Developing a Computer Program for Bus Routing. Final Report.

    ERIC Educational Resources Information Center

    Newton, Rita M.; Thomas, Warren H.

    A computer-based method was developed that can translate available data about schools, students, and bus facilities into a set of bus routes and schedules prior to the start of the school year. Each route can be so designed via the computer model that student riding time and bus capacity constraints are satisfied at the same time that total bus…

  8. Development and Implementation of a Bus Driver Training Program.

    ERIC Educational Resources Information Center

    Buchovecky, John G.

    A bus driver training program was developed and implemented in a rural school district in an effort to improve the driving skills of the bus drivers. The program was tailored to meet the needs of the bus drivers and utilized various community agencies for demonstration and teaching purposes. The subject areas included in the program were driver…

  9. Ashford Conn. Gets Funds for New Cleaner School Bus

    EPA Pesticide Factsheets

    The Town of Ashford, Conn. will receive $20,000 from the USEPA to help pay for a new school bus that emits less pollution than its older bus. The new bus will help reduce pollution linked to health problems such as asthma and lung damage.

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  11. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  12. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  13. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  14. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Interim provisions. 94.12 Section 94.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains...

  15. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  16. 40 CFR 1042.145 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Interim provisions. 1042.145 Section... Standards and Related Requirements § 1042.145 Interim provisions. (a) General. The provisions in this section apply instead of other provisions in this part. This section describes when these...

  17. 39 CFR 952.6 - Interim impounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim impounding. 952.6 Section 952.6 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.6 Interim impounding. In preparation for or during the pendency of...

  18. Locating Interim Assessments within Teachers' Assessment Practice

    ERIC Educational Resources Information Center

    Riggan, Matthew; Olah, Leslie Nabors

    2011-01-01

    Promising research on the teaching and learning impact of classroom-embedded formative assessment has spawned interest in a broader array of assessment tools and practices, including interim assessment. Although researchers have begun to explore the impact of interim assessments in the classroom, like other assessment tools and practices, they…

  19. 20 CFR 410.234 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Interim provisions. 410.234 Section 410.234 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, TITLE IV... Evidence § 410.234 Interim provisions. (a) Notwithstanding any other provision of this subpart, a...

  20. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  1. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  2. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  4. Toward a risk assessment of the spent fuel and high-level nuclear waste disposal system. Risk assessment requirements, literature review, methods evaluation: an interim report

    SciTech Connect

    Hamilton, L.D.; Hill, D.; Rowe, M.D.; Stern, E.

    1986-04-01

    This report provides background information for a risk assessment of the disposal system for spent nuclear fuel and high-level radioactive waste (HLW). It contains a literature review, a survey of the statutory requirements for risk assessment, and a preliminary evaluation of methods. The literature review outlines the state of knowledge of risk assessment and accident consequence analysis in the nuclear fuel cycle and its applicability to spent fuel and HLW disposal. The survey of statutory requirements determines the extent to which risk assessment may be needed in development of the waste-disposal system. The evaluation of methods reviews and evaluates merits and applicabilities of alternative methods for assessing risks and relates them to the problems of spent fuel and HLW disposal. 99 refs.

  5. Performance of school bus retrofit systems: ultrafine particles and other vehicular pollutants.

    PubMed

    Zhang, Qunfang; Zhu, Yifang

    2011-08-01

    This study evaluated the performance of retrofit systems for diesel-powered school buses, a diesel oxidation catalyst (DOC) muffler and a spiracle crankcase filtration system (CFS), regarding ultrafine particles (UFPs) and other air pollutants from tailpipe emissions and inside bus cabins. Tailpipe emissions and in-cabin air pollutant levels were measured before and after retrofitting when the buses were idling and during actual pick-up/drop off routes. Retrofit systems significantly reduced tailpipe emissions with a reduction of 20-94% of total particles with both DOC and CFS installed. However, no unequivocal decrease was observed for in-cabin air pollutants after retrofitting. The AC/fan unit and the surrounding air pollutant concentrations played more important roles for determining the in-cabin air quality of school buses than did retrofit technologies. Although current retrofit systems reduce children's exposure while waiting to board at a bus station, retrofitting by itself does not protect children satisfactorily from in-cabin particle exposures. Turning on the bus engine increased in-cabin UFP levels significantly only when the wind blew from the bus' tailpipe toward its hood with its windows open. This indicated that wind direction and window position are significant factors determining how much self-released tailpipe emissions may penetrate into the bus cabin. The use of an air purifier was found to remove in-cabin particles by up to 50% which might be an alternative short-to-medium term strategy to protect children's health.

  6. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  7. Vet Centers. Interim final rule.

    PubMed

    2015-08-04

    The Department of Veterans Affairs (VA) is amending its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This interim final rule amends regulatory criteria to conform to the 2013 Act, to include new and revised definitions.

  8. FUEL CELL BUS DEMONSTRATION IN MEXICO CITY

    EPA Science Inventory

    The report discusses the performance of a cull-size, zero-emission, Proton Exchange Membrane (PEM) fuel-cell-powered transit bus in the atmospheric environment of Mexico City. To address the air quality problems caused by vehicle emissions in Mexico City, a seminar on clean vehic...

  9. Repeater For A Digital-Communication Bus

    NASA Technical Reports Server (NTRS)

    Torres-Guzman, Esteban; Olson, Stephen; Heaps, Tim

    1993-01-01

    Digital repeater circuit designed to extend range of communication on MIL-STD-1553 bus beyond original maximum allowable length of 300 ft. Circuit provides two-way communication, one way at time, and conforms to specifications of MIL-STD-1553. Crosstalk and instability eliminated.

  10. EPA Love the Bus in Texas

    EPA Pesticide Factsheets

    DALLAS - (Feb. 11, 2015) Texas' school bus drivers safely transport children to and from school every day and they should not have to worry about pollutants emitted from buses. The U. S. Environmental Protection Agency (EPA) is awarding a total of $

  11. School Bus Accidents: Reducing Incidents and Injuries

    ERIC Educational Resources Information Center

    Mahoney, Daniel

    2009-01-01

    The number of children injured in nonfatal school bus accidents annually is more than double the number previously estimated. In Ohio alone, approximately 20,800 children younger than 18 were occupants of school buses that were involved in crashes in 2003 and 2004 (McGeehan 2007). Among those children, most had minor or no injuries. However, there…

  12. SDRAM bus schedule of HDTV video decoder

    NASA Astrophysics Data System (ADS)

    Wang, Hui; He, Yan L.; Yu, Lu

    2001-12-01

    In this paper, a time division multiplexed task scheduling (TDM) is designed for HDTV video decoder is proposed. There are three tasks: to fetch decoded data from SDRAM for displaying (DIS), read the reference data from SDRAM for motion compensating (REF) and write the motion compensated data back to SDRAM (WB) on the bus. The proposed schedule is based on the novel 4 banks interlaced SDRAM storage structure which results in less overhead on read/write time. Two SDRAM of 64M bits (4Bank×512K×32bit) are used. Compared with two banks, the four banks storage strategy read/write data with 45% less time. Therefore the process data rates for those three tasks are reduced. TDM is developed by round robin scheduling and fixed slot allocating. There are both MB slot and task slot. As a result the conflicts on bus are avoided, and the buffer size is reduced 48% compared with the priority bus scheduling. Moreover, there is a compacted bus schedule for the worst case of stuffing owning to the reduced executing time on tasks. The size of buffer is reduced and the control logic is simplified.

  13. Energy DataBus (Fact Sheet)

    SciTech Connect

    Not Available

    2013-07-01

    NREL has developed the Energy DataBus, an open-sourced software that collects massive amounts of energy-related data at second-to-second intervals; stores it in a massive, scalable database; and turns it into useful information.

  14. Mission Services Evolution Center Message Bus

    NASA Technical Reports Server (NTRS)

    Mayorga, Arturo; Bristow, John O.; Butschky, Mike

    2011-01-01

    The Goddard Mission Services Evolution Center (GMSEC) Message Bus is a robust, lightweight, fault-tolerant middleware implementation that supports all messaging capabilities of the GMSEC API. This architecture is a distributed software system that routes messages based on message subject names and knowledge of the locations in the network of the interested software components.

  15. Bus 54 -- Where are you? A school bus intelligent information system

    SciTech Connect

    Truett, L.F.; Moore, S.; Tonn, B.; Conley, T.

    1998-07-01

    Although major accidents involving school buses are rare (only about 0.3% of all fatal crashes since 1986 are classified as school-bus-related), even minor accidents and breakdowns cause a great deal of parental anxiety. The objective of this research is to design an efficient, cost-effective, accurate, and secure system that will track individual school buses and communicate appropriate information to the school system`s central administration unit, to the school transportation administrator, and to parents of children on the bus. The greatest benefit of the proposed information system is that parents and officials can always know the location and condition (these conditions would vary depending on the needs of a particular school system) of the school buses. In case of an accident or mechanical problem, when emergency crews are needed, they can be dispatched almost immediately with a good understanding of the problem and the exact location of the bus. In addition to being able to track the bus while the child is on board, parents will be able to determine the location of their child`s bus prior to its arrival in the morning in order to prevent the child from needing to wait outside in inclement weather. The information available to parents can also be expanded to include maps of limited routes (e.g., snow routes). Basically, the Bus 54 concept consists of a bus component and a central data processing unit. Each bus will be outfitted with a global positioning satellite (GPS) device, a wireless communication device, and wireless data communication service. The central data processing unit will receive and process information from the buses and provide information access to parents and officials via an Internet link.

  16. Measurement of Parasitic Inductances in the Bus-Bar Assembly of a High Power Voltage Source Converter

    NASA Astrophysics Data System (ADS)

    Datta, Aniket; Narayanan, G.

    2016-12-01

    Insulated gate bipolar transistor (IGBT) based voltage source converters use copper plates with insulating sheets in between them (sandwich bus-bar arrangement) for connecting the different device terminals in the power circuit. In such converters, the parasitic inductances in the power circuit are crucial as they cause overvoltage spikes across the device. Also, the parasitics affect the current sharing between IGBTs when they are connected in parallel in high power converters. The conduction path through plates and fasteners in the bus-bar assembly is three-dimensional and quite complex, making analytical evaluation of the stray inductance quite challenging. The first objective here is to present a simple experimental setup and experimental procedure, which are convenient for power electronic engineers, to measure the bus-bar inductance. The next objective is to carry out experimental studies on the inductances offered by different components and sub-assemblies in a bus-bar assembly. This includes evaluation of inductances of the different conduction paths in typical bus-bar plates. The third objective is to experimentally evaluate the parasitic inductances in the bus-bar assembly of a commercial 250 kVA high power converter. Each leg of this converter consists of two 300 A/1200 V IGBTs connected in parallel. The effective inductance seen by the individual device modules are determined experimentally.

  17. Numerical study of urban traffic flow with dedicated bus lane and intermittent bus lane

    NASA Astrophysics Data System (ADS)

    Zhu, H. B.

    2010-08-01

    Based on the cellular automaton traffic flow model and the concept of public transport priority, a two-lane traffic model with an intermittent bus lane is proposed and the properties of urban traffic flow are studied. The cases of traffic with a dedicated bus lane (DBL), an intermittent bus lane (IBL) and an ordinary two-lane traffic are simulated, and comparisons in the form of the fundamental diagrams and the velocity-density profiles are made between them. It is shown that the DBL has the advantage of freeing buses from traffic interference and also has the disadvantage of disrupting traffic, the IBL is more efficient in improving the bus flow than ordinary two-lane traffic and maintaining the car flow at a higher level at the same time than the DBL, while the ordinary two-lane traffic suppresses public transportation and is not advantageous in easing urban traffic congestion. Also it is indicated that the DBL is only appropriate for low traffic flow in a two-lane traffic system, and this limitation can be partly overcome by opening the bus lane to general traffic intermittently when the bus lane is not in use by buses.

  18. Summary of results from the testing of three prototype thermal bus systems for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Brady, T. K.

    1990-01-01

    Three Space Station Freedom (SSF) prototype two-phase thermal bus systems, utilizing ammonia as the working fluid, underwent extensive evaluation during 1988 and 1989. All three test articles were exercised in a similar ambient test program to characterize performance under simulated SSF operating conditions. Additionally, thermal buses were integrated with heat pipe radiators and tested in a thermal vacuum (T/V) environment. Testing has shown that two-phase thermal bus performance can be generally bound in an ambient test program; however, integrated T/V testing with heat pipe radiators similar to those that will be used on SSF is required to fully characterize system performance.

  19. Testing of Environmental Satellite Bus-Instrument Interfaces Using Engineering Models

    NASA Technical Reports Server (NTRS)

    Gagnier, Donald; Hayner, Rick; Nosek, Thomas; Roza, Michael; Hendershot, James E.; Razzaghi, Andrea I.

    2004-01-01

    This paper discusses the formulation and execution of a laboratory test of the electrical interfaces between multiple atmospheric scientific instruments and the spacecraft bus that carries them. The testing, performed in 2002, used engineering models of the instruments and the Aura spacecraft bus electronics. Aura is one of NASA s Earth Observatory System missions. The test was designed to evaluate the complex interfaces in the command and data handling subsystems prior to integration of the complete flight instruments on the spacecraft. A problem discovered during the flight integration phase of the observatory can cause significant cost and schedule impacts. The tests successfully revealed problems and led to their resolution before the full-up integration phase, saving significant cost and schedule. This approach could be beneficial for future environmental satellite programs involving the integration of multiple, complex scientific instruments onto a spacecraft bus.

  20. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of interim status. 270.73... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.73 Termination of interim status. Interim status terminates when: (a) Final administrative disposition of...

  1. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is... after the attachment of the insurance under the interim binder to which such valuation...

  2. 40 CFR 270.71 - Operation during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Operation during interim status. 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.71 Operation during interim status. (a) During the interim status period the facility shall not: (1)...

  3. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Interim final rule. 106.35 Section 106.35... PHMSA Rulemaking Documents § 106.35 Interim final rule. An interim final rule is issued without first... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause,...

  4. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source...

  5. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102... REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or... administrative judge granting interim relief under 5 U.S.C. 7701(b)(2)(A) and a petition for review of...

  6. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public... example, an interim rule may be issued in instances when normal procedures for notice and comment prior...

  7. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    SciTech Connect

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  8. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  9. 58. VIEW OF SIGNAL BUS SECTION NUMBER 2 LOCATED OVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. VIEW OF SIGNAL BUS SECTION NUMBER 2 LOCATED OVER THE CONTROL ROOM MEZZANINE IN THE SIGNAL POWER CONDITIONING ROOM. BUS IS A HEAVY COPPER BAR APPROXIMATELY 1/2" BY 4" WHICH CONDUCTS POWER THROUGHOUT THE POWER PLANT. BUS ARE PROTECTED BY A BRICK AND SOAPSTONE HOUSING. OPENINGS FOR INSPECTION AND ACCESS WOULD NORMALLY BE PROTECTED BY GLASS DOORS. THE BUS WOULD BE SUPPORTED ON INSULATORS WITHIN THE BRICK CHAMBER. BUS WAS REMOVED AND SALVAGED WHEN THE STATION WAS ABANDONED. THE OBJECT IN THE TOP CENTER OF THE PHOTOGRAPH IS A POTENTIAL TRANSFORMER USED TO REDUCE BUS POTENTIAL OF 2200 VOLTS TO LOW VOLTAGES SAFE FOR USE IN CONTROL ROOM CIRCUITRY. POTENTIAL TRANSFORMERS ARE PRECISION DEVICES WHICH PRODUCE AN ACCURATE LOW VOLTAGE ANALOG OF THE HIGH VOLTAGE ON THE BUS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  10. Integer programming model for optimizing bus timetable using genetic algorithm

    NASA Astrophysics Data System (ADS)

    Wihartiko, F. D.; Buono, A.; Silalahi, B. P.

    2017-01-01

    Bus timetable gave an information for passengers to ensure the availability of bus services. Timetable optimal condition happened when bus trips frequency could adapt and suit with passenger demand. In the peak time, the number of bus trips would be larger than the off-peak time. If the number of bus trips were more frequent than the optimal condition, it would make a high operating cost for bus operator. Conversely, if the number of trip was less than optimal condition, it would make a bad quality service for passengers. In this paper, the bus timetabling problem would be solved by integer programming model with modified genetic algorithm. Modification was placed in the chromosomes design, initial population recovery technique, chromosomes reconstruction and chromosomes extermination on specific generation. The result of this model gave the optimal solution with accuracy 99.1%.

  11. Priorities for an age-friendly bus system.

    PubMed

    Broome, Kieran; Worrall, Linda; McKenna, Kryss; Boldy, Duncan

    2010-09-01

    This article presents the results of a study on the barriers and facilitators to bus use for people aged 60 or older. Two complementary methodologies, nominal group technique and focussed ethnography, were used to identify barriers and facilitators and rank their importance. Two sample sites from Queensland, Australia, were selected, with 227 people participating in the nominal group technique and 40 people participating in the focussed ethnography component. Seven priorities for age-friendly bus systems emerged from the data: vehicle entrance/exit; bus driver friendliness and helpfulness; timetables and scheduling of buses; bus stop locations; pedestrian infrastructure; information and training for older people; and bus routes and destinations. These findings will assist researchers, policy makers, and transport providers to set evidence-based strategic directions for creating age-friendly bus systems. Both methods provide complementary perspectives on bus usability, which could not be gained from either method alone.

  12. Concordance of interim and final estimates of influenza vaccine effectiveness: a systematic review.

    PubMed

    Leung, Vivian K; Cowling, Benjamin J; Feng, Shuo; Sullivan, Sheena G

    2016-04-21

    The World Health Organization's Global Influenza Surveillance and Response System meets twice a year to generate a recommendation for the composition of the seasonal influenza vaccine. Interim vaccine effectiveness (VE) estimates provide a preliminary indication of influenza vaccine performance during the season and may be useful for decision making. We reviewed 17 pairs of studies reporting 33 pairs of interim and final estimates using the test-negative design to evaluate whether interim estimates can reliably predict final estimates. We examined features of the study design that may be correlated with interim estimates being substantially different from their final estimates and identified differences related to change in study period and concomitant changes in sample size, proportion vaccinated and proportion of cases. An absolute difference of no more than 10% between interim and final estimates was found for 18 of 33 reported pairs of estimates, including six of 12 pairs reporting VE against any influenza, six of 10 for influenza A(H1N1)pdm09, four of seven for influenza A(H3N2) and two of four for influenza B. While we identified inconsistencies in the methods, the similarities between interim and final estimates support the utility of generating and disseminating preliminary estimates of VE while virus circulation is ongoing.

  13. Impact of a pilot Walking School Bus intervention on children's pedestrian safety behaviors [abstract

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Walking School Bus (WSB) programs have increased children's active commuting to school and physical activity; however, the impact on child pedestrian safety behaviors has not been studied. Our study objective was to evaluate the impact of a WSB program on children's pedestrian safety behaviors. We c...

  14. The Walking School Bus and children's physical activity: A pilot cluster randomized controlled trial

    Technology Transfer Automated Retrieval System (TEKTRAN)

    To evaluate the impact of a "walking school bus" program on children's rates of active commuting to school and physical activity. We conducted a pilot cluster randomized controlled trial among 4th-graders from 8 schools in Houston, Texas (N = 149). Random allocation to treatment or control condition...

  15. Development of analytical tools for evaluating operations of light rail at grade within an urban signal system. Interim report 3. Research report, September 1991-August 1994

    SciTech Connect

    Berry, R.A.; Walters, C.H.

    1994-11-01

    This report identifies and recommends measures of impact that are applicable to the operation of at-grade light rail crossings within traffic signal systems. The key point in identifying measures of impact is to maintain consistency with traffic signal measures of impacts. The recommended measures of impact include average delay and queue length. The report illustrates how the analyst can apply both manual calculation methods and computer models to estimate these measures of impact. Included in the discussion is a screening procedure that is desinged to minimize total work effort by identifying impacts and mitigating them with the least intensive analysis method. However, if the analysis results are marginal, then full simulation of the traffic signal system including the light rail line is warranted. The recommended programs for such evaluation are TRANSYT-7F for simpler problems and Traf-NETSIM for complex problems and analysis of system variances.

  16. Evaluation of the deposition, translocation and pathological response of brake dust with and without added chrysotile in comparison to crocidolite asbestos following short-term inhalation: Interim results

    SciTech Connect

    Bernstein, David M.; Rogers, Rick; Sepulveda, Rosalina; Kunzendorf, Peter; Bellmann, Bernd; Ernst, Heinrich; Phillips, James I.

    2014-04-01

    Chrysotile has been frequently used in the past in manufacturing brakes and continues to be used in brakes in many countries. This study was designed to provide an understanding of the biokinetics and potential toxicology following inhalation of brake dust following short term exposure in rats. The deposition, translocation and pathological response of brake dust derived from brake pads manufactured with chrysotile were evaluated in comparison to the amphibole, crocidolite asbestos. Rats were exposed by inhalation 6 h/day for 5 days to either brake dust obtained by sanding of brake-drums manufactured with chrysotile, a mixture of chrysotile and the brake dust or crocidolite asbestos. No significant pathological response was observed at any time point in either the brake dust or chrysotile/brake dust exposure groups. The long chrysotile fibers (> 20 μm) cleared quickly with T{sub 1/2} estimated as 30 and 33 days, respectively in the brake dust and the chrysotile/brake dust exposure groups. In contrast, the long crocidolite fibers had a T{sub 1/2} > 1000 days and initiated a rapid inflammatory response in the lung following exposure resulting in a 5-fold increase in fibrotic response within 91 days. These results provide support that brake dust derived from chrysotile containing brake drums would not initiate a pathological response in the lung following short term inhalation. - Highlights: • We evaluated brake dust w/wo added chrysotile in comparison to crocidolite asbestos. • Persistence, translocation, pathological response in the lung and pleural cavity. • Chrysotile cleared rapidly from the lung while the crocidolite asbestos persisted. • No significant pathology observed at any time point in the brake-dust groups. • Crocidolite produced pathological response - Wagner 4 interstitial fibrosis by 32d.

  17. Houston-harte of San Angelo: A case study application of a full-cost model for evaluating urban passenger transportation. Interim research report

    SciTech Connect

    Smith, K.M.; Qin, J.; Weissmann, J.; Euritt, M.A.; Martello, M.T.

    1996-04-01

    This report evaluates the full costs of transportation alternatives on the Houston-Harte Corridor in San Angelo, Texas. The alternatives examined include those considered by the San Angelo District of the Texas Department of Transportation, which are: (1) the continuation of the existing frontage lanes-only configuration and (2) the construction of the mainlanes for completion of the facility. In addition, this study considers each of the above alternatives with transit service along the corridor, resulting in the third and fourth scenarios. The results of MODECOST - a computer model developed by a Center for Transportation Research (CTR) team -- indicate that the addition of mainlanes to the Houston-Harte Corridor is both feasible and cost effective. The case studies conducted as part of this project show that, in many cases, the costs borne by users are equally or more significant than the facility cost in determining the cost implications of various transportation alternatives. The external costs, depending on the volumes of traffic expected along the corridor, may also be substantial. Demonstrating this complex relationship, this case study showed that the capital-intensive Houston-Harte project was, over time, more cost effective than no facility. This study also shows that full-cost analysis is an effective tool for comparing transportation alternatives. Full-cost analysis provides a value for each alternative that may be used as an assessment indicator to policy-makers and transportation professionals.

  18. Evaluation of the deposition, translocation and pathological response of brake dust with and without added chrysotile in comparison to crocidolite asbestos following short-term inhalation: interim results.

    PubMed

    Bernstein, David M; Rogers, Rick; Sepulveda, Rosalina; Kunzendorf, Peter; Bellmann, Bernd; Ernst, Heinrich; Phillips, James I

    2014-04-01

    Chrysotile has been frequently used in the past in manufacturing brakes and continues to be used in brakes in many countries. This study was designed to provide an understanding of the biokinetics and potential toxicology following inhalation of brake dust following short term exposure in rats. The deposition, translocation and pathological response of brake dust derived from brake pads manufactured with chrysotile were evaluated in comparison to the amphibole, crocidolite asbestos. Rats were exposed by inhalation 6 h/day for 5 days to either brake dust obtained by sanding of brake-drums manufactured with chrysotile, a mixture of chrysotile and the brake dust or crocidolite asbestos. No significant pathological response was observed at any time point in either the brake dust or chrysotile/brake dust exposure groups. The long chrysotile fibers (>20 μm) cleared quickly with T(½) estimated as 30 and 33 days, respectively in the brake dust and the chrysotile/brake dust exposure groups. In contrast, the long crocidolite fibers had a T(½)>1000 days and initiated a rapid inflammatory response in the lung following exposure resulting in a 5-fold increase in fibrotic response within 91 days. These results provide support that brake dust derived from chrysotile containing brake drums would not initiate a pathological response in the lung following short term inhalation.

  19. Indoor air quality and occupational exposures at a bus terminal.

    PubMed

    El-Fadel, Mutasem; El-Hougeiri, Nisrine

    2003-07-01

    This article presents an assessment of indoor air quality at a bus terminal. For this purpose, field surveys were conducted, and air samples were collected and analyzed for the presence of selected indoor air quality indicators. Mathematical modeling was performed to simulate bus emission rates, occupational exposure, and ventilation requirements to maintain acceptable indoor air quality. A sensitivity analysis based on literature-derived emission rates estimates was conducted to evaluate the effect of seasonal temperature changes within the terminal. Control measures to improve indoor air quality at the terminal are also outlined. While carbon monoxide concentrations were below the corresponding American Conference of Governmental Industrial Hygienists' (ACGIH) standards under normal operating conditions, they exceeded the 8-hr recommended average standard at peak hours and the World Health Organization (WHO) standard at all times. Total suspended particulates levels, on the other hand, were above the 24-hr American Society of Heating, Refrigerating and Air Conditioning Engineers' (ASHRAE) standard. Carbon monoxide emission rates that were estimated using the transient mass balance model correlated relatively well with those reported in the literature. Modeling results showed that the natural ventilation rate should be at least doubled for acceptable indoor air quality. While pollutant exposure levels depended on the individual activity patterns and the pollutant concentration, pollutant emissions rates within the terminal were affected mostly by the temperature with a 20-25 percent variation in carbon monoxide levels due to changes in seasonal temperatures.

  20. An interim evaluation of the thermal stability of Cu--Y--/sup 85/Kr sputter deposits and plans for evantual disposal

    SciTech Connect

    McClanahan, E.D.; Bradley, E.R.

    1988-04-01

    A pilot process was developed and demonstrated for trapping and storing /sup 85/Kr from the dissolver off-gas stream of a nuclear fuel reprocessing plant. Ions produced in a low-pressure krypton discharge are implanted on the inner wall of a krypton trapping storage device (KTSD). Objectives were to measure the release of /sup 85/Kr implanted in a copper--yttrium alloy, outline the characterization work to be performed on the Cu/endash/Y/endash//sup 85/Kr waste form, and identify the options available for disposing of the remaining /sup 85/Kr. Release rates were obtained from periodic measurements of the krypton released from both radioactive and nonradioactive krypton-loaded KTSDs. Sampling is expected to continue as long as the extrapolated release rates remain acceptable for a period not to exceed one half-life (/approximately/10 y). Seven tests were performed on a nonradioactive KTSD at 180 to 450/degree/C. Three KTSDs loaded with 80 to 150 Ci of /sup 85/Kr stored at 150, 250, and 350/degree/C were sampled four times each. Proposed post-elevated-temperature storage characterization of the Cu/endash/Y/endash//sup 85/Kr waste form is outlined. Both radioactive and nonradioactive test specimens stored below 350/degree/C showed release rates less than 0.1%y/sup /minus/1/. Release rates for the radioactive specimens were obtained for storage periods of 1.6, 1.1, and 0.4 y at 150, 250 and 350/degree/C. The nonradioactive specimen has been held at temperatures between 180 and 450/degree/C, but mainly at 350/degree/C for a total storage time of 2.1 y. Tests should continue for a period not exceeding 10 y, and then the remaining Cu/endash/Y/endash//sup 85/Kr waste form should be evaluated to better predict the overall stability. Three options for the disposal of the remaining /sup 85/Kr. 3 refs., 2 figs., 2 tabs.

  1. Spacecraft design project multipurpose satellite bus MPS

    NASA Technical Reports Server (NTRS)

    Kellman, Lyle; Riley, John; Szostak, Michael; Watkins, Joseph; Willhelm, Joseph; Yale, Gary

    1990-01-01

    The thrust of this project was to design not a single spacecraft, but to design a multimission bus capable of supporting several current payloads and unnamed, unspecified future payloads. Spiraling costs of spacecraft and shrinking defense budgets necessitated a fresh look at the feasibility of a multimission spacecraft bus. The design team chose two very diverse and different payloads, and along with them two vastly different orbits, to show that multimission spacecraft buses are an area where indeed more research and effort needs to be made. Tradeoffs, of course, were made throughout the design, but optimization of subsystem components limited weight and volume penalties, performance degradation, and reliability concerns. Simplicity was chosen over more complex, sophisticated and usually more efficient designs. Cost of individual subsystem components was not a primary concern in the design phase, but every effort was made to chose flight tested and flight proven hardware. Significant cost savings could be realized if a standard spacecraft bus was indeed designed and purchased in finite quantities.

  2. Research of intelligent bus coin box

    NASA Astrophysics Data System (ADS)

    Xin, Shihao

    2017-03-01

    In the energy-saving emission reduction of the social context, in response to low-carbon travel, buses become the majority of people choose. We have designed this sorting machine for the present situation that the bus company has received a large amount of mixed zero coins and employed a large amount of manpower to sort out and lower the efficiency. Its function is to separate the coins and notes mixed, and the coins sort storage, the display shows the value of the received coins, so that the whole mechanized inventory classification, reduce the cost of clearing up and improve the efficiency of zero cash recycling, use Simple mechanical principles for classification, to be efficient, accurate and practical. Really meet the current city bus companies, commerce and banking and other industries in order to zero notes, zero coins in the actual demand. The size and specification of this machine are designed according to the size of the bus coin box. It is suitable for almost all buses. It can be installed in the coin box directly, real-time sorting and real-time counting. The difficulty of clearing change.

  3. 40 CFR 180.319 - Interim tolerances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... TOLERANCES AND EXEMPTIONS FOR PESTICIDE CHEMICAL RESIDUES IN FOOD Specific Tolerances § 180.319 Interim... pesticide chemicals in or on the following raw agricultural commodities: Substances Uses Tolerance in...

  4. Interim Prosthesis Options for Dental Implants.

    PubMed

    Siadat, Hakimeh; Alikhasi, Marzieh; Beyabanaki, Elaheh

    2016-01-24

    Dental implants have become a popular treatment modality for replacing missing teeth. In this regard, the importance of restoring patients with function during the implant healing period has grown in recent decades. Esthetic concerns, especially in the anterior region of the maxilla, should also be considered until the definitive restoration is delivered. Another indication for such restorations is maintenance of the space required for esthetic and functional definitive restorations in cases where the implant site is surrounded by natural teeth. Numerous articles have described different types of interim prostheses and their fabrication techniques. This article aims to briefly discuss all types of implant-related interim prostheses by different classification including provisional timing (before implant placement, after implant placement in unloading and loading periods), materials, and techniques used for making the restorations, the type of interim prosthesis retention, and definitive restoration. Furthermore, the abutment torque for such restorations and methods for transferring the soft tissue from interim to definitive prostheses are addressed.

  5. An optimal control strategy for DC bus voltage regulation in photovoltaic system with battery energy storage.

    PubMed

    Daud, Muhamad Zalani; Mohamed, Azah; Hannan, M A

    2014-01-01

    This paper presents an evaluation of an optimal DC bus voltage regulation strategy for grid-connected photovoltaic (PV) system with battery energy storage (BES). The BES is connected to the PV system DC bus using a DC/DC buck-boost converter. The converter facilitates the BES power charge/discharge to compensate for the DC bus voltage deviation during severe disturbance conditions. In this way, the regulation of DC bus voltage of the PV/BES system can be enhanced as compared to the conventional regulation that is solely based on the voltage-sourced converter (VSC). For the grid side VSC (G-VSC), two control methods, namely, the voltage-mode and current-mode controls, are applied. For control parameter optimization, the simplex optimization technique is applied for the G-VSC voltage- and current-mode controls, including the BES DC/DC buck-boost converter controllers. A new set of optimized parameters are obtained for each of the power converters for comparison purposes. The PSCAD/EMTDC-based simulation case studies are presented to evaluate the performance of the proposed optimized control scheme in comparison to the conventional methods.

  6. An Optimal Control Strategy for DC Bus Voltage Regulation in Photovoltaic System with Battery Energy Storage

    PubMed Central

    Daud, Muhamad Zalani; Mohamed, Azah; Hannan, M. A.

    2014-01-01

    This paper presents an evaluation of an optimal DC bus voltage regulation strategy for grid-connected photovoltaic (PV) system with battery energy storage (BES). The BES is connected to the PV system DC bus using a DC/DC buck-boost converter. The converter facilitates the BES power charge/discharge to compensate for the DC bus voltage deviation during severe disturbance conditions. In this way, the regulation of DC bus voltage of the PV/BES system can be enhanced as compared to the conventional regulation that is solely based on the voltage-sourced converter (VSC). For the grid side VSC (G-VSC), two control methods, namely, the voltage-mode and current-mode controls, are applied. For control parameter optimization, the simplex optimization technique is applied for the G-VSC voltage- and current-mode controls, including the BES DC/DC buck-boost converter controllers. A new set of optimized parameters are obtained for each of the power converters for comparison purposes. The PSCAD/EMTDC-based simulation case studies are presented to evaluate the performance of the proposed optimized control scheme in comparison to the conventional methods. PMID:24883374

  7. Communication design for multi-boards based on VME bus

    NASA Astrophysics Data System (ADS)

    Liu, Yang; Song, Fazhi; Wei, Kai; Fu, Zhenxian

    2015-02-01

    As a widely used open-architecture computer bus ,VME bus is increasingly applied in military, aerospace, transportation and other large-scale control systems. Lithography, a very delicate and complicated integrated circuit manufacturing equipment, uses many circuit boards with VME interface in its control system, including one single-board computer, many movement control boards and one data acquisition board. This paper designs communication modules which include VME bus module and VME user-defined bus module for multi-boards in Lithography control system. VME bus module is designed for the communication between the single-board computer and movement control boards and VME user-defined bus is designed for the communication between movement control boards and data acquisition board. The experimental results demonstrate its effectiveness.

  8. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  9. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  10. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  11. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  12. 49 CFR 605.18 - Comments by private school bus operators.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Comments by private school bus operators. 605.18... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.18 Comments by private school bus operators. Private school bus operators may file written comments on an...

  13. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  14. The School Action Effectiveness Study: Second Interim Report, Part II. Report No. 342.

    ERIC Educational Resources Information Center

    Gottfredson, Gary D.; And Others

    This report, the second part of a longer study prepared by the Delinquency and School Environments Program, further describes interim results of the program's national evaluation of the Office of Juvenile Justice and Delinquency Prevention's (OJJDP's) Alternative Education Program. The report consists of evaluations of 14 specific projects: (1)…

  15. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  16. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  17. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... COMMISSION Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors Reviews AGENCY: Nuclear Regulatory Commission. ACTION: Draft Interim Staff Guidance; request for comment... comment on, draft Interim Staff Guidance (ISG) ESP/COL-ISG-027, ``Interim Staff Guidance...

  18. Rural Community Service Coordinator Program Interim Evaluation.

    ERIC Educational Resources Information Center

    Heffernan, William D.; Heffernan, Judith Bortner

    This is an early assessment of the Rural Community Service Coordinator Program (RCSCP), organized by the University of Missouri Extension Service using funds from the federal Food Security Act of 1985. Five full-time coordinators were named by area mental health officials to help rural people cope with despair and emotional disturbances caused by…

  19. TMS communications hardware. Volume 2: Bus interface unit

    NASA Technical Reports Server (NTRS)

    Brown, J. S.; Hopkins, G. T.

    1979-01-01

    A prototype coaxial cable bus communication system used in the Trend Monitoring System to interconnect intelligent graphics terminals to a host minicomputer is described. The terminals and host are connected to the bus through a microprocessor-based RF modem termed a Bus Interface Unit (BIU). The BIU hardware and the Carrier Sense Multiple Access Listen-While-Talk protocol used on the network are described.

  20. Pipelined asynchronous time-division multiplexing optical bus

    NASA Astrophysics Data System (ADS)

    Zheng, S. Q.; Li, Yueming

    1997-12-01

    We propose a pipelined asynchronous time-division multiplexing optical bus. Such a bus can use one of two hardwared priority schemes: the linear priority scheme and the round-robin priority scheme. Our simulation results show that the performance of the proposed bus is significantly better than the performances of known pipelined synchronous time-division multiplexing optical buses. The possibilities of using our buses to construct multichannel switches and multidimensional processor arrays are also discussed.

  1. The SMART MIL-STD-1553 bus adapter hardware manual

    NASA Technical Reports Server (NTRS)

    Ton, T. T.

    1981-01-01

    The SMART Multiplexer Interface Adapter, (SMIA) a complete system interface for message structure of the MIL-STD-1553, is described. It provides buffering and storage for transmitted and received data and handles all the necessary handshaking to interface between parallel 8-bit data bus and a MIL-STD serial bit stream. The bus adapter is configured as either a bus controller of a remote terminal interface. It is coupled directly to the multiplex bus, or stub coupled through an additional isolation transformer located at the connection point. Fault isolation resistors provide short circuit protection.

  2. Space shuttle SRM interim contract, part 1

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Essential studies and analyses required to integrate the SRM into the booster and overall space shuttle system. Emphasis was placed on the case, nozzle, insulation, and propellant components with resulting performance, weight, and structural load characteristics being generated. Effort conducted during the time period of this contract included studies, analyses, planning, and preliminary design activities. Technical requirements identified in the SRM Project Request for Proposal No. 8-1-4-94-98401 and Thiokol's proposed SRM design (designated Configuration 0) established the basis for this effort. The requirements were evaluated jointly with MSFC and altered where necessary to incorporate new information that evolved after issuance of the RFP and during the course of this interim contract. Revised water impact loads and load distributions were provided based on additional model test data and analytical effort conducted by NASA subsequent to the RFP release. Launch pad peaking loads into the SRM aft skirt were provided which also represented a change from RFP requirements. A modified SRM/External Tank (ET) attachment configuration with new structural load data was supplied by NASA, and direction was received to include a 2 percent inert weight contingency.

  3. Bus application of oxygen-enrichment technology and diesel-electric hybrid systems

    SciTech Connect

    Sekar, R.R.; Marr, W.W.

    1993-10-01

    The amendments to the Clean Air Act (CAA) mandate very strict limits on particulate, smoke, and other emissions from city buses. The use of alternative fuels, such as compressed natural gas (CNG) or methanol, can help transit operators, such as the Chicago Transit Authority (CTA), meet the mandated limits. However, the capital investment needed to convert the fueling infrastructure and buses is large, as is the expense of training personnel. If a {open_quotes}clean diesel{close_quotes} bus can be implemented with the help of oxygen-enrichment technology or a diesel-electric hybrid system, this large investment could be postponed for many years. The Regional Transportation Authority (RTA) initiated this project to evaluate the possibility of applying these technologies to CTA buses. Argonne National Laboratory (ANL) conducted a limited number of engine tests and computer analyses and concluded that both concepts are practical and will help in a {open_quotes}clean diesel{close_quotes} bus that can meet the mandated limits of the CAA amendments. The oxygen enrichment of combustion air depends on the availability of a compact and economical membrane separator. Because the technology for this critical component is still under development, it is recommended that an actual bus demonstration be delayed until prototype membranes are available. The hybrid propulsion system is ready for the demonstration phase, and it is recommended that the CTA and RTA commence planning for a bus demonstration.

  4. Study on the Calculation Models of Bus Delay at Bays Using Queueing Theory and Markov Chain

    PubMed Central

    Sun, Li; Sun, Shao-wei; Wang, Dian-hai

    2015-01-01

    Traffic congestion at bus bays has decreased the service efficiency of public transit seriously in China, so it is crucial to systematically study its theory and methods. However, the existing studies lack theoretical model on computing efficiency. Therefore, the calculation models of bus delay at bays are studied. Firstly, the process that buses are delayed at bays is analyzed, and it was found that the delay can be divided into entering delay and exiting delay. Secondly, the queueing models of bus bays are formed, and the equilibrium distribution functions are proposed by applying the embedded Markov chain to the traditional model of queuing theory in the steady state; then the calculation models of entering delay are derived at bays. Thirdly, the exiting delay is studied by using the queueing theory and the gap acceptance theory. Finally, the proposed models are validated using field-measured data, and then the influencing factors are discussed. With these models the delay is easily assessed knowing the characteristics of the dwell time distribution and traffic volume at the curb lane in different locations and different periods. It can provide basis for the efficiency evaluation of bus bays. PMID:25759720

  5. Traffic signal design and simulation for vulnerable road users safety and bus preemption

    NASA Astrophysics Data System (ADS)

    Lo, Shih-Ching; Huang, Hsieh-Chu

    2015-01-01

    Mostly, pedestrian car accidents occurred at a signalized interaction is because pedestrians cannot across the intersection safely within the green light. From the viewpoint of pedestrian, there might have two reasons. The first one is pedestrians cannot speed up to across the intersection, such as the elders. The other reason is pedestrians do not sense that the signal phase is going to change and their right-of-way is going to be lost. Developing signal logic to protect pedestrian, who is crossing an intersection is the first purpose of this study. In addition, to improve the reliability and reduce delay of public transportation service is the second purpose. Therefore, bus preemption is also considered in the designed signal logic. In this study, the traffic data of the intersection of Chong-Qing North Road and Min-Zu West Road, Taipei, Taiwan, is employed to calibrate and validate the signal logic by simulation. VISSIM 5.20, which is a microscopic traffic simulation software, is employed to simulate the signal logic. From the simulated results, the signal logic presented in this study can protect pedestrians crossing the intersection successfully. The design of bus preemption can reduce the average delay. However, the pedestrian safety and bus preemption signal will influence the average delay of cars largely. Thus, whether applying the pedestrian safety and bus preemption signal logic to an intersection or not should be evaluated carefully.

  6. Effects of self stretching on pain and musculoskeletal symptom of bus drivers.

    PubMed

    Lee, Jung-Ho; Gak, Hwang Bo

    2014-12-01

    [Purpose] The aim of this study was to evaluate the musculoskeletal symptoms, pain and risk of postures as well as the effects of stretching exercise on the work-related symptoms and pain of bus drivers. [Subjects and Methods] Eighty-one drivers were randomly recruited from a bus corporation for this study. Information about pain levels, painful regions, and general characteristics of subjects was obtained using the symptom research form (KOSHA Code H-30-2003). The level of pain was assessed on a scale of numeric rating scale (NRS) which is divided by 10. Ergonomic posture assessment was conducted using the rapid upper limb assessment (RULA). Self-stretching exercise was performed for 4 weeks by the bus drivers who suffered from neck and shoulder pain. [Results] Musculoskeletal symptoms were present in the order of shoulder, neck, lower back and lower extremities. Compared with other jobs, the final score, and the action level of bus drivers were very high, showing 57.6% of action levels 3 and 4. A statistically significant decrease of pain was shown after the self-stretching intervention. There was also a significant decrease of musculoskeletal symptoms in the neck and shoulders after the self-stretching exercise. [Conclusion] Performing stretching for musculoskeletal symptoms had a positive influence on the symptoms and reduced pain.

  7. Study on the calculation models of bus delay at bays using queueing theory and Markov chain.

    PubMed

    Sun, Feng; Sun, Li; Sun, Shao-Wei; Wang, Dian-Hai

    2015-01-01

    Traffic congestion at bus bays has decreased the service efficiency of public transit seriously in China, so it is crucial to systematically study its theory and methods. However, the existing studies lack theoretical model on computing efficiency. Therefore, the calculation models of bus delay at bays are studied. Firstly, the process that buses are delayed at bays is analyzed, and it was found that the delay can be divided into entering delay and exiting delay. Secondly, the queueing models of bus bays are formed, and the equilibrium distribution functions are proposed by applying the embedded Markov chain to the traditional model of queuing theory in the steady state; then the calculation models of entering delay are derived at bays. Thirdly, the exiting delay is studied by using the queueing theory and the gap acceptance theory. Finally, the proposed models are validated using field-measured data, and then the influencing factors are discussed. With these models the delay is easily assessed knowing the characteristics of the dwell time distribution and traffic volume at the curb lane in different locations and different periods. It can provide basis for the efficiency evaluation of bus bays.

  8. Effects of Self Stretching on Pain and Musculoskeletal Symptom of Bus Drivers

    PubMed Central

    Lee, Jung-Ho; Gak, Hwang Bo

    2014-01-01

    [Purpose] The aim of this study was to evaluate the musculoskeletal symptoms, pain and risk of postures as well as the effects of stretching exercise on the work-related symptoms and pain of bus drivers. [Subjects and Methods] Eighty-one drivers were randomly recruited from a bus corporation for this study. Information about pain levels, painful regions, and general characteristics of subjects was obtained using the symptom research form (KOSHA Code H-30-2003). The level of pain was assessed on a scale of numeric rating scale (NRS) which is divided by 10. Ergonomic posture assessment was conducted using the rapid upper limb assessment (RULA). Self-stretching exercise was performed for 4 weeks by the bus drivers who suffered from neck and shoulder pain. [Results] Musculoskeletal symptoms were present in the order of shoulder, neck, lower back and lower extremities. Compared with other jobs, the final score, and the action level of bus drivers were very high, showing 57.6% of action levels 3 and 4. A statistically significant decrease of pain was shown after the self-stretching intervention. There was also a significant decrease of musculoskeletal symptoms in the neck and shoulders after the self-stretching exercise. [Conclusion] Performing stretching for musculoskeletal symptoms had a positive influence on the symptoms and reduced pain. PMID:25540496

  9. Traffic signal design and simulation for vulnerable road users safety and bus preemption

    SciTech Connect

    Lo, Shih-Ching; Huang, Hsieh-Chu

    2015-01-22

    Mostly, pedestrian car accidents occurred at a signalized interaction is because pedestrians cannot across the intersection safely within the green light. From the viewpoint of pedestrian, there might have two reasons. The first one is pedestrians cannot speed up to across the intersection, such as the elders. The other reason is pedestrians do not sense that the signal phase is going to change and their right-of-way is going to be lost. Developing signal logic to protect pedestrian, who is crossing an intersection is the first purpose of this study. In addition, to improve the reliability and reduce delay of public transportation service is the second purpose. Therefore, bus preemption is also considered in the designed signal logic. In this study, the traffic data of the intersection of Chong-Qing North Road and Min-Zu West Road, Taipei, Taiwan, is employed to calibrate and validate the signal logic by simulation. VISSIM 5.20, which is a microscopic traffic simulation software, is employed to simulate the signal logic. From the simulated results, the signal logic presented in this study can protect pedestrians crossing the intersection successfully. The design of bus preemption can reduce the average delay. However, the pedestrian safety and bus preemption signal will influence the average delay of cars largely. Thus, whether applying the pedestrian safety and bus preemption signal logic to an intersection or not should be evaluated carefully.

  10. Correlation between Driver Subjective Fatigue and Bus Lateral Position in a Driving Simulator

    PubMed Central

    Gharagozlou, Faramarz; Mazloumi, Adel; Saraji, Gebraeil Nasl; Nahvi, Ali; Ashouri, Mohammadreza; Mozaffari, Hamed

    2015-01-01

    Background: Driver fatigue as a leading cause of death in the transportation industry can impair the driving performance in long-distance driving task. Studies on the links of driver subjective fatigue and the bus lateral position are still an exploratory issue that requires further investigation. This study aimed to determine the correlation between the driver subjective fatigue and the bus lateral position in a driving simulator. Methods: This descriptive-analytical research was conducted on 30 professional male bus drivers participated in a two-hour driving session. The driver subjective fatigue was assessed by the Fatigue Visual Analogue Scale (F-VAS) at 10-min intervals. Simultaneously, the performance measures of lane drifting as the mean and standard deviation of the bus lateral position (SDLP) were calculated during the simulated driving task. Descriptive statistics and the Spearman correlation coefficient were used to describe and analyze the data. Results: Fatigue levels had an increasing trend as the time-on-task of driving increased. Time-on-task of driving had the greatest effect on the fatigue self-evaluation (r = 0.605, p < 0.0001). The results showed a significant correlation between fatigue self-evaluation and bus lateral position (r = 0.567, p < 0.0001). Conclusion: As the time of driving increased, driving performance was affected adversely, as shown by the increase in the SDLP. Even so, the effect of individual differences on driving performance should not be overlooked. This work concludes that predicting the state of a driver fatigue based on the group mean data has some complications for any application. PMID:26396734

  11. Managing Student Behavior on the School Bus: A Key to Bus Safety

    ERIC Educational Resources Information Center

    American Federation of Teachers (NJ), 2007

    2007-01-01

    School buses are the safest form of mass transit in America. Every day, school buses travel through congested city traffic and on isolated country roads in all types of weather, safely transporting millions of children to and from school and school-related activities. Federal and state standards for school bus construction and maintenance and…

  12. When the Wheels on the Bus Go Round: Social Interactions on the School Bus

    ERIC Educational Resources Information Center

    Galliger, Courtney C.; Tisak, Marie S.; Tisak, John

    2009-01-01

    Children's social interactions are often dependent upon the setting or context in which they occur. The current study explored the school bus as a unique context for social interaction. One hundred and fifty-seven elementary school students (78 males and 79 females), in grades 3, 4, and 5, completed a questionnaire concerning the rate and types of…

  13. Extracting potential bus lines of Customized City Bus Service based on public transport big data

    NASA Astrophysics Data System (ADS)

    Ren, Yibin; Chen, Ge; Han, Yong; Zheng, Huangcheng

    2016-11-01

    Customized City Bus Service (CCBS) can reduce the traffic congestion and environmental pollution that caused by the increasing in private cars, effectively. This study aims to extract the potential bus lines and each line's passenger density of CCBS by mining the public transport big data. The datasets used in this study are mainly Smart Card Data (SCD) and bus GPS data of Qingdao, China, from October 11th and November 7th 2015. Firstly, we compute the temporal-origin-destination (TOD) of passengers by mining SCD and bus GPS data. Compared with the traditional OD, TOD not only has the spatial location, but also contains the trip's boarding time. Secondly, based on the traditional DBSCAN algorithm, we put forwards an algorithm, named TOD-DBSCAN, combined with the spatial-temporal features of TOD.TOD-DBSCAN is used to cluster the TOD trajectories in peak hours of all working days. Then, we define two variables P and N to describe the possibility and passenger destiny of a potential CCBS line. P is the probability of the CCBS line. And N represents the potential passenger destiny of the line. Lastly, we visualize the potential CCBS lines extracted by our procedure on the map and analyse relationship between potential CCBS lines and the urban spatial structure.

  14. Effect of stoppage time on motion of a bus through a sequence of signals

    NASA Astrophysics Data System (ADS)

    Nagatani, Takashi

    2017-01-01

    We study the dynamic motion of a bus moving through the series of traffic signals where the bus stops at bus stops during a time. The dynamic state of the bus depends highly on both stoppage time at the bus stop and cycle time of the signal. It is found that the bus motion has two kinds of dynamic states: the one is the normal state and the other is the offset state. In the normal state, the bus stops normally at both bus stops and signals. In the offset state, the bus passes timely through the signal sometimes and the stoppage time at the bus stop is offset against the stopping time at the signal. If the bus speed has the same value as the car speed, the travel time of the bus is consistent with that of the car in the offset state. The region map (phase diagram) is shown for two kinds of dynamic states: the normal and offset states.

  15. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  16. Improved blood pressure control among school bus drivers with hypertension.

    PubMed

    Doyle, Joseph; Severance-Fonte, Tina; Morandi-Matricaria, Elizabeth; Wogen, Jenifer; Frech-Tamas, Feride

    2010-04-01

    The impact of a hypertension awareness and educational program, BP DownShift, was evaluated among school bus drivers in a southern US state. At baseline (August 2007), blood pressure (BP) measurements, self-reported demographics, and hypertension awareness and management practices were collected from drivers who consented to participate in the study. Interventions included 4 educational mailings, installation of BP machines at all bus terminals, and access to free dietitian consultations and gym memberships. BP was evaluated using Department of Transportation guidelines. BP was remeasured and a survey was administered at follow-up (May 2008). At baseline, 208 drivers consented to the BP screening; 120 (58%) returned for a follow-up assessment. Most participants completing the study were female (73%) and African American (72%). Mean age was 50 years and mean body mass index was 32 kg/m(2); 52% of participants were obese. In all, 58% of participants reported a prior diagnosis of hypertension by a physician, and 63% reported taking antihypertensive medication. Both systolic and diastolic BP (SBP and DBP) were lower at follow-up (135/82 mmHg vs. 145/87 mmHg at baseline; P < 0.001, both comparisons); 42% had a reduction in SBP > 10 mmHg, and 44% had a reduction in DBP > 5 mmHg. At follow-up, 58% were controlled to BP < 140/90, compared to 38% at baseline (P < 0.001). At follow-up, an increased proportion of previously diagnosed drivers reported home BP monitoring, healthy diet, and regular exercise as components of hypertension self-management. The implementation of our hypertension education, self-management, and awareness program was associated with an improvement in BP control, which may positively impact commercial driver's license recertification as well as improve employee health.

  17. Interface Provides Standard-Bus Communication

    NASA Technical Reports Server (NTRS)

    Culliton, William G.

    1995-01-01

    Microprocessor-controlled interface (IEEE-488/LVABI) incorporates service-request and direct-memory-access features. Is circuit card enabling digital communication between system called "laser auto-covariance buffer interface" (LVABI) and compatible personal computer via general-purpose interface bus (GPIB) conforming to Institute for Electrical and Electronics Engineers (IEEE) Standard 488. Interface serves as second interface enabling first interface to exploit advantages of GPIB, via utility software written specifically for GPIB. Advantages include compatibility with multitasking and support of communication among multiple computers. Basic concept also applied in designing interfaces for circuits other than LVABI for unidirectional or bidirectional handling of parallel data up to 16 bits wide.

  18. Spaceborne Fiber Optic Data Bus (SFODB)

    NASA Technical Reports Server (NTRS)

    Bretthauer, Joy W.; Chalfant, Chuck H.; Orlando, Fred J.; Parkerson, P.; Rezek, Ed; Sawyer, Marc

    1999-01-01

    Spaceborne Fiber Optic Data Bus (SFODB) is an IEEE 1393 compliant, gigabit per second, fiber optic network specifically designed to support the real-time, on-board data handling requirements of remote sensing spacecraft. The network is fault tolerant highly reliable, and capable of withstanding the rigors of launch and the harsh space environment. SFODB achieves this operational and environmental performance while maintaining the small size, light weight, and low power necessary for spaceborne applications. On December 9, 1998, SFODB was successfully demonstrated at NASA's Goddard Space Flight Center (GSFC).

  19. An SAE high speed ring bus overview

    NASA Astrophysics Data System (ADS)

    Kroeger, Brian W.; Shih, Hubert

    An overview of the protocols and important features of the SAE high-speed ring bus (HSRB) standard is presented here, along with the functional design of a typical ring interface unit architecture. The counterrotating ring topology, with both loopback and bypass mechanisms, provides the high degree of fault tolerance desirable in many military and avionic systems. The error-detection, fault-detection, and recovery mechanisms are briefly described to illustrate the robustness of the HSRB system. The reserved-priority token-passing protocol is shown to provide efficient and deterministic performance, uselful in real-time applications where messages must be transmitted predictably, quickly, and reliably.

  20. Redesign of Transjakarta Bus Driver's Cabin

    NASA Astrophysics Data System (ADS)

    Mardi Safitri, Dian; Azmi, Nora; Singh, Gurbinder; Astuti, Pudji

    2016-02-01

    Ergonomic risk at work stations with type Seated Work Control was one of the problems faced by Transjakarta bus driver. Currently “Trisakti” type bus, one type of bus that is used by Transjakarta in corridor 9, serving route Pinang Ranti - Pluit, gained many complaints from drivers. From the results of Nordic Body Map questionnaires given to 30 drivers, it was known that drivers feel pain in the neck, arms, hips, and buttocks. Allegedly this was due to the seat position and the button/panel bus has a considerable distance range (1 meter) to be achieved by drivers. In addition, preliminary results of the questionnaire using Workstation Checklist identified their complaints about uncomfortable cushion, driver's seat backrest, and the exact position of the AC is above the driver head. To reduce the risk level of ergonomics, then did research to design the cabin by using a generic approach to designing products. The risk analysis driver posture before the design was done by using Rapid Upper Limb Assessment (RULA), Rapid Entire Body Assessment (REBA), and Quick Exposure Checklist (QEC), while the calculation of the moment the body is done by using software Mannequin Pro V10.2. Furthermore, the design of generic products was done through the stages: need metric-matrix, house of quality, anthropometric data collection, classification tree concept, concept screening, scoring concept, design and manufacture of products in the form of two-dimensional. While the design after design risk analysis driver posture was done by using RULA, REBA, and calculation of moments body as well as the design visualized using software 3DMax. From the results of analysis before the draft design improvements cabin RULA obtained scores of 6, REBA 9, and the result amounted to 57.38% QEC and moment forces on the back is 247.3 LbF.inch and on the right hip is 72.9 LbF.in. While the results of the proposed improvements cabin design RULA obtained scores of 3, REBA 4, and the moment of force on

  1. Using the Mil. Std 1553B data bus in future spacecraft onboard applications

    NASA Astrophysics Data System (ADS)

    Plummer, Chris; Bordes, Yves

    2002-07-01

    This paper discusses the use of the Mil. Std 1553B data bus as the principal onboard data handling bus for future spacecraft applications. The paper takes a pragmatic approach by: Identifying the characteristics of the onboard bus traffic and its characteristics; Looking at future trends in onboard bus traffic; Describing the characteristics of the Mil. Std 1553B data bus; Proposing techniques that can be used on the Mil. Std 1553B data bus in future spacecraft application.

  2. School Bus Driver Instructional Program. Instructor's Guide--Advanced Unit.

    ERIC Educational Resources Information Center

    Department of Transportation, Washington, DC. National Highway Safety Bureau.

    Geared to behavioral objectives, the instruction is organized into programed units on emergency driving techniques, first aid, field trips, transporting exceptional students, detecting hazards, controlling the position of the bus, driving under special conditions, and preventive maintenance of the bus. Each unit is constructed around content…

  3. Preliminary Investigation of Workload on Intrastate Bus Traffic Controllers

    NASA Astrophysics Data System (ADS)

    Yen Bin, Teo; Azlis-Sani, Jalil; Nur Annuar Mohd Yunos, Muhammad; Ismail, S. M. Sabri S. M.; Tajedi, Noor Aqilah Ahmad

    2016-11-01

    The daily routine of bus traffic controller which involves high mental processes would have a direct impact on the level of workload. To date, the level of workload on the bus traffic controllers in Malaysia is relatively unknown. Excessive workload on bus traffic controllers would affect the control and efficiency of the system. This paper served to study the workload on bus traffic controllers and justify the needs to conduct further detailed research on this field. The objectives of this research are to identify the level of workload on the intrastate bus traffic controllers. Based on the results, recommendations will be proposed for improvements and future studies. The level of workload for the bus traffic controllers is quantified using questionnaire adapted from NASA TLX. Interview sessions were conducted for validation of workload. Sixteen respondents were involved and it was found that the average level of workload based on NASA TLX was 6.91. It was found that workload is not affected by gender and marital status. This study also showed that the level of workload and working experience of bus traffic controllers has a strong positive linear relationship. This study would serve as a guidance and reference related to this field. Since this study is a preliminary investigation, further detailed studies could be conducted to obtain a better comprehension regarding the bus traffic controllers.

  4. A decentralized software bus based on IP multicas ting

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Montgomery, Todd

    1995-01-01

    We describe decentralized reconfigurable implementation of a conference management system based on the low-level Internet Protocol (IP) multicasting protocol. IP multicasting allows low-cost, world-wide, two-way transmission of data between large numbers of conferencing participants through the Multicasting Backbone (MBone). Each conference is structured as a software bus -- a messaging system that provides a run-time interconnection model that acts as a separate agent (i.e., the bus) for routing, queuing, and delivering messages between distributed programs. Unlike the client-server interconnection model, the software bus model provides a level of indirection that enhances the flexibility and reconfigurability of a distributed system. Current software bus implementations like POLYLITH, however, rely on a centralized bus process and point-to-point protocols (i.e., TCP/IP) to route, queue, and deliver messages. We implement a software bus called the MULTIBUS that relies on a separate process only for routing and uses a reliable IP multicasting protocol for delivery of messages. The use of multicasting means that interconnections are independent of IP machine addresses. This approach allows reconfiguration of bus participants during system execution without notifying other participants of new IP addresses. The use of IP multicasting also permits an economy of scale in the number of participants. We describe the MULITIBUS protocol elements and show how our implementation performs better than centralized bus implementations.

  5. Network Extender for MIL-STD-1553 Bus

    NASA Technical Reports Server (NTRS)

    Marcus, Julius; Hanson, T. David

    2003-01-01

    An extender system for MIL-STD-1553 buses transparently couples bus components at multiple developer sites. The bus network extender is a relatively inexpensive system that minimizes the time and cost of integration of avionic systems by providing a convenient mechanism for early testing without the need to transport the usual test equipment and personnel to an integration facility. This bus network extender can thus alleviate overloading of the test facility while enabling the detection of interface problems that can occur during the integration of avionic systems. With this bus extender in place, developers can correct and adjust their own hardware and software before products leave a development site. Currently resident at Johnson Space Center, the bus network extender is used to test the functionality of equipment that, although remotely located, is connected through a MILSTD- 1553 bus. Inasmuch as the standard bus protocol for avionic equipment is that of MIL-STD-1553, companies that supply MIL-STD-1553-compliant equipment to government or industry and that need long-distance communication support might benefit from this network bus extender

  6. Riding the Bus: Symbol and Vehicle for Boundary Spanning

    ERIC Educational Resources Information Center

    Romero, Deborah

    2014-01-01

    In this reflective essay I examine the activity of a bus tour, organized as the result of an ongoing university and city partnership. I illustrate how riding the bus is not only symbolic for positionality in our society, but also how it can be a viable mechanism for initiating boundary spanning and promoting opportunities for place-based learning…

  7. Parents' Perceptions of the Rural School Bus Ride

    ERIC Educational Resources Information Center

    Ramage, Rob; Howley, Aimee

    2005-01-01

    This article reports findings from a study of the perceptions of parents about the experience of long bus rides on their children. Twenty-six parents, whose homes were located on the longest bus route in a rural Midwestern school district, provided interviews regarding the experiences of a total of 37 students. In the analysis of the interview…

  8. A High Efficiency DC Bus Regulator / RPC for Spacecraft Applications

    NASA Astrophysics Data System (ADS)

    Birchenough, Arthur G.

    2004-02-01

    DC bus voltage regulation may be required in future high powered spacecraft due to the length of the busses or because they are not generated at precise voltage levels. In these cases the regulation range is often only a few percent increase or decrease, but conventional DC voltage regulators switch all the power passing through them, and this level of power switched determines the size and losses in the regulator. A recently developed concept uses a low power DC-DC converter in series with the bus to raise or lower the bus voltage over a small range. This partial power processing technique combines the small size and power losses of the low power converter with the ability to regulate, (over a small range) a high power bus. The Series Connected Buck Boost Regulator (SCBBR) described herein provides bus regulation with an efficiency of 98%. The circuit also provides bus switching and overcurrent limiting functions of a Remote Power Controller (RPC). This paper describes the circuit design and performance of a breadboard SCBBR configured as a bus voltage regulator providing +/- 40% voltage regulation range, bus switching, and overload limiting.

  9. 16. Bus Room (also known as Switch Gear Room), view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Bus Room (also known as Switch Gear Room), view to the southeast. An air circuit breaker compressor (visible in photograph number 2) was once attached to the main bus relay visible in the background of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID

  10. Application of CAN-bus Network in Intelligent parking

    NASA Astrophysics Data System (ADS)

    Jianjun, WU; Juan, Hu

    Convenient life makes intelligent parking every- where. This paper describes how to connect the various separate modern terminal of intelligent parking with CAN-bus network, and the competitive advantage of the system by using the CAN-bus network. From a technical point of view, this paper describes the development trend of intelligent parking in next few years.

  11. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  12. 32 CFR 935.138 - Motor bus operation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor bus operation. 935.138 Section 935.138 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE TERRITORIAL AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.138 Motor bus operation. Each person operating a...

  13. Monitoring versus interim analysis of clinical trials: a perspective from the pharmaceutical industry.

    PubMed

    Enas, G G; Dornseif, B E; Sampson, C B; Rockhold, F W; Wuu, J

    1989-03-01

    The definitions of "interim analysis" and "monitoring" of clinical trials are often ambiguous in the current literature. The resulting confusion can lead to erroneous conclusions and misguided decisions, especially when activities that are operational or observational are evaluated in a probabilistic sense as inferential. The authors seek to define "interim analysis" and "monitoring" in a mutually exclusive fashion. These definitions will then provide the opportunity to review and categorize existing clinical trial practices and procedures. This will clarify such issues as "when to look" and "when to pay a price" (e.g., test size and power) and characterize such issues in the context of pharmaceutical industry drug development.

  14. Myocardial infarction among male bus, taxi, and lorry drivers in middle Sweden.

    PubMed Central

    Gustavsson, P; Alfredsson, L; Brunnberg, H; Hammar, N; Jakobsson, R; Reuterwall, C; Ostlin, P

    1996-01-01

    OBJECTIVES: The aim of the present case-referent study was to investigate the incidence of myocardial infarction among male professional drivers, taking the type of vehicles and area of residence into account. METHODS: The study base comprised all men aged 30-74 in five counties in middle Sweden during 1976-81 or 1976-84. Incident cases of the first episode of myocardial infarction were identified from registers of hospital admissions and causes of deaths. Referents were selected randomly from the study base. Information about occupation was obtained from the national censuses in 1970 and 1975. The possible impact from tobacco smoking and overweight were evaluated by simulations in combination with indirect data on these factors. RESULTS: The incidence of myocardial infarction was increased among bus drivers in Stockholm (relative risk (RR) = 1.53, 95% confidence interval (95% CI) 1.15-2.05), and among taxi drivers both in Stockholm (RR 1.65, 95% CI 1.30-2.11) and in the surrounding rural counties (RR 1.82, 95% CI 1.17-2.82). A smaller increase was found among long distance lorry drivers, whereas the relative risk among short distance lorry drivers was close to unity. Indirect comparisons make it unlikely that the excess among bus drivers in Stockholm could be explained by uncontrolled confounding from tobacco smoking or overweight. A very high proportion (more than 80%) of urban bus drivers in Sweden report a combination of high psychological demands and low control at work. CONCLUSIONS: Different types of drivers are at different risk of myocardial infarction. Bus drivers in urban areas seem to be at an increased risk, which is unlikely to be explained by uncontrolled confounding from tobacco smoking or overweight. Psychosocial work conditions may play a part in the increased incidence of myocardial infarction among urban bus drivers and should be investigated further. PMID:8664960

  15. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  16. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  17. 18 CFR 385.1113 - Interim relief (Rule 1113).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim relief (Rule... Under the NGPA § 385.1113 Interim relief (Rule 1113). (a) The petitioner may at any time file a request for interim relief in a proceeding under this subpart, setting forth the legal and factual basis...

  18. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim certification procedures... Certification of Substantially Equivalent Agencies § 115.203 Interim certification procedures. (a) Upon receipt of a request for interim certification filed under § 115.202, the Assistant Secretary may...

  19. 48 CFR 801.690-8 - Interim appointment provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Interim appointment... Authority, and Responsibilities 801.690-8 Interim appointment provisions. (a) To ensure availability of procurement support, an interim appointment may be granted for a limited period of time when a candidate...

  20. 10 CFR 205.288 - Interim and ancillary orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Interim and ancillary orders. 205.288 Section 205.288... Distribution of Refunds § 205.288 Interim and ancillary orders. The Director of the Office of Hearings and Appeals or his designee may issue any interim or ancillary orders, or make any rulings or...

  1. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... COMMISSION Interim Staff Guidance on Changes During Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing this notice for use of, and to solicit public comment on the draft Interim...

  2. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information... commission may elect to establish an interim wholesale rate as described in paragraph (b) of this section....

  3. 5 CFR 1209.11 - Duration of stay; interim compliance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Duration of stay; interim compliance... WHISTLEBLOWING Stay Requests § 1209.11 Duration of stay; interim compliance. (a) Duration of stay. A stay becomes...) Interim compliance. An agency must immediately comply with an order granting a stay request. Although...

  4. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Qualifying for interim status. 270.70... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.70 Qualifying for interim status. (a) Any person who owns or operates an “existing HWM facility” or a...

  5. 40 CFR 66.23 - Interim recalculation of penalty.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Interim recalculation of penalty. 66... Penalties § 66.23 Interim recalculation of penalty. (a) The Administrator, upon concluding that a previously... respond in accordance with the provisions of § 66.51. The decision to accept the interim calculation or...

  6. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  7. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  8. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Interim appointments. 301... Interim appointments. If it is essential to appoint an individual as a Contracting Officer who does not... HCA (non-delegable) may make an interim appointment for up to 2 years. If an extension of time...

  9. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.570 Section 417... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment. (1) CMS makes monthly advance payments equivalent to the HMO's or CMP's interim per capita rate...

  10. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  11. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... of accessible OTRBs, the operator shall meet the following interim service requirements:...

  12. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section... Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment. Claimants may apply for an interim emergency payment, prior to a determination under § 94.21(a). If...

  13. 41 CFR 101-29.206 - Interim Federal standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal standard. 101-29.206 Section 101-29.206 Public Contracts and Property Management Federal Property Management... DESCRIPTIONS 29.2-Definitions § 101-29.206 Interim Federal standard. An interim Federal standard is a...

  14. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Request for interim certification... Certification of Substantially Equivalent Agencies § 115.202 Request for interim certification. (a) A request for interim certification under this subpart shall be filed with the Assistant Secretary by the...

  15. 40 CFR 270.72 - Changes during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Changes during interim status. 270.72... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.72 Changes during interim status. (a) Except as provided in paragraph (b), the owner or operator of...

  16. 7 CFR 900.70 - Applications for interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Applications for interim relief. 900.70 Section 900.70... Applications for interim relief. (a) Filing the application. A person who has filed a petition pursuant to... statement of the objections, if any, of the Administrator to the application for interim relief, and may...

  17. 40 CFR 264.3 - Relationship to interim status standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Relationship to interim status... FACILITIES General § 264.3 Relationship to interim status standards. A facility owner or operator who has fully complied with the requirements for interim status—as defined in section 3005(e) of RCRA...

  18. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  19. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  20. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  1. Genetic algorithm for multiple bus line coordination on urban arterial.

    PubMed

    Yang, Zhen; Wang, Wei; Chen, Shuyan; Ding, Haoyang; Li, Xiaowei

    2015-01-01

    Bus travel time on road section is defined and analyzed with the effect of multiple bus lines. An analytical model is formulated to calculate the total red time a bus encounters when travelling along the arterial. Genetic algorithm is used to optimize the offset scheme of traffic signals to minimize the total red time that all bus lines encounter in two directions of the arterial. The model and algorithm are applied to the major part of Zhongshan North Street in the city of Nanjing. The results show that the methods in this paper can reduce total red time of all the bus lines by 31.9% on the object arterial and thus improve the traffic efficiency of the whole arterial and promote public transport priority.

  2. Method and systems for a radiation tolerant bus interface circuit

    NASA Technical Reports Server (NTRS)

    Kinstler, Gary A. (Inventor)

    2007-01-01

    A bus management tool that allows communication to be maintained between a group of nodes operatively connected on two busses in the presence of radiation by transmitting periodically a first message from one to another of the nodes on one of the busses, determining whether the first message was received by the other of the nodes on the first bus, and when it is determined that the first message was not received by the other of the nodes, transmitting a recovery command to the other of the nodes on a second of the of busses. Methods, systems, and articles of manufacture consistent with the present invention also provide for a bus recovery tool on the other node that re-initializes a bus interface circuit operatively connecting the other node to the first bus in response to the recovery command.

  3. CMM Interim Check Design of Experiments (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  4. Design review report FFTF interim storage cask

    SciTech Connect

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  5. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  6. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  7. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSUMER PRODUCTS Test Procedures § 430.27 Petitions for waiver and applications for interim waiver. (a)(1... design characteristics which either prevent testing of the basic model according to the prescribed test procedures, or the prescribed test procedures may evaluate the basic model in a manner so unrepresentative...

  8. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSUMER PRODUCTS Test Procedures § 430.27 Petitions for waiver and applications for interim waiver. (a)(1... design characteristics which either prevent testing of the basic model according to the prescribed test procedures, or the prescribed test procedures may evaluate the basic model in a manner so unrepresentative...

  9. Prospects: The Congressionally Mandated Study of Educational Growth and Opportunity. The Interim Report.

    ERIC Educational Resources Information Center

    Puma, Michael J.; And Others

    This publication is the first interim report from the Congressionally Mandated Study of Educational Growth and Opportunity (Prospects), and describes students' characteristics and the schools they attend. Prospects is designed to evaluate the short- and long-term consequences of Chapter 1 program participation by following for 5 years large…

  10. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    SciTech Connect

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  11. Cost Implications of an Interim Storage Facility in the Waste Management System

    SciTech Connect

    Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L; Petersen, Gordon M.; Nutt, Mark; Carter, Joe; Cotton, Thomas

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  12. Public transit research: Rail, bus, and new technology, 1991. Transportation Research Record

    SciTech Connect

    Kassabian, N.C.; Tobias, A.G.; Crayton, L.; Solomon, K.; Solomon, N.

    1991-01-01

    The report contains: Image of Rail Transit; Train Operations Computer Simulation Case Study: Single-Tracking Operations for Philadelphia's Market-Frankford Subway Elevated Rail Rapid Transit Line; Transit Railcar Quantities: Scale Economies; Evaluation of Training Programs in Rail Transit: Its Role and Status; Methodology for Evaluating Out-of-Direction Bus Route Segments; Integration of Fixed- and Flexible-Route Bus Systems; Downtown Space for Buses--The Manhattan Experience; Implications of Transit Drug Testing and Maintenance Service Procurement for Small Urban and Rural Systems; Challenges for Integration of Alternative Fuels in the Transit Industry; Short History of the Transbay Transit Terminal and the Relocation of the San Francisco Greyhound Depot Thereto; Airport Development with Automated People Mover Systems; Review of Four Alternative Airport Terminal Passenger Mobility Systems.

  13. Interim Control Module Extraction Strut Assembly

    NASA Technical Reports Server (NTRS)

    Hansen, Chris

    1999-01-01

    The Interim Control Module is a propulsion and attitude control module for the International Space Station developed to serve as a replacement for the Russian Service Module in the event that Russia does not deliver the hardware as expected. The hardware was developed through a joint NASA/Naval Research Laboratory program and is based on a Department of Defense payload. This paper discusses the development and testing of the Extraction Strut hardware that will be used to assist in removing the Interim Control Module from the Shuttle's payload bay.

  14. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  15. The Wheels on the Bus Go “Buy Buy Buy”: School Bus Advertising Laws

    PubMed Central

    2012-01-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment “forum analysis” as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property. PMID:22742065

  16. The wheels on the bus go "buy buy buy": school bus advertising laws.

    PubMed

    Pomeranz, Jennifer L

    2012-09-01

    School buses, a practical necessity for millions of children, are at the center of new efforts to raise revenue. School bus advertising laws bring public health and commercialization concerns to the school setting. In doing so, they potentially expose school districts to First Amendment lawsuits. I examined various school bus advertising bills and laws. I reviewed First Amendment "forum analysis" as applied in the transit and school settings to clarify how this legal test may affect school districts subject to such laws. I have made recommendations for school districts to enact appropriate policies to ensure that such advertising does not undermine public health and to enable the districts to maintain control over their property.

  17. Bus industry market study. Report -- Task 3.2: Fuel cell/battery powered bus system

    SciTech Connect

    Zalbowitz, M.

    1992-06-02

    In support of the commercialization of fuel cells for transportation, Georgetown University, as a part of the DOE/DOT Fuel Cell Transit Bus Program, conducted a market study to determine the inventory of passenger buses in service as of December, 1991, the number of buses delivered in 1991 and an estimate of the number of buses to be delivered in 1992. Short term and long term market projections of deliveries were also made. Data was collected according to type of bus and the field was divided into the following categories which are defined in the report: transit buses, school buses, commercial non-transit buses, and intercity buses. The findings of this study presented with various tables of data collected from identified sources as well as narrative analysis based upon interviews conducted during the survey.

  18. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  19. Bus bar electrical feedthrough for electrorefiner system

    DOEpatents

    Williamson, Mark; Wiedmeyer, Stanley G; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J

    2013-12-03

    A bus bar electrical feedthrough for an electrorefiner system may include a retaining plate, electrical isolator, and/or contact block. The retaining plate may include a central opening. The electrical isolator may include a top portion, a base portion, and a slot extending through the top and base portions. The top portion of the electrical isolator may be configured to extend through the central opening of the retaining plate. The contact block may include an upper section, a lower section, and a ridge separating the upper and lower sections. The upper section of the contact block may be configured to extend through the slot of the electrical isolator and the central opening of the retaining plate. Accordingly, relatively high electrical currents may be transferred into a glovebox or hot-cell facility at a relatively low cost and higher amperage capacity without sacrificing atmosphere integrity.

  20. Integrated optics bus access module for intramachine communication

    NASA Astrophysics Data System (ADS)

    Karioja, Pentti; Tammela, Simo K. T.; Hannula, Tapio

    1991-12-01

    The feasibility of a passive bidirectional fiber optic bus and the packaging considerations of a bus access module have been studied. The bus uses 110/125 micrometers HCS fiber and passive integrated optic couplers for bus access. The access couplers are asymmetric and were fabricated using a Ag-Na ion exchange process. The asymmetry of the coupler was 5 dB, the launch loss to the bus was 6 dB and the tap-off loss to the node was 11 dB. With the integrated optics coupler it is possible to connect 6 nodes to the bidirectional bus. It is also possible to realize a simple, easy-to-use, and reliable bus access module for intramachine communication. The integrated optics coupler, a LED chip, and a PIN-diode chip and transceiver electronics are packaged in an electrical connector with a two-fiber optical cable pigtail. Active and passive components are butt coupled to the coupler. The 0.5 dB alignment tolerances for the fiber pigtails, the LED, and the PIN-diode chips are +/- 5 micrometers .

  1. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  2. The Interim Superintendent: A Case Study

    ERIC Educational Resources Information Center

    Bigham, Gary; Nix, Susan J.

    2011-01-01

    Considering the vitally important role that the superintendent plays in the overall functioning and wellbeing of any school district, the filling of that position should never be done in haste. Due to the importance of this process and the time it requires, school districts often employ an interim superintendent. In this single case study, one…

  3. 45 CFR 83.20 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Interim procedures. 83.20 Section 83.20 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REGULATION FOR THE ADMINISTRATION AND ENFORCEMENT OF SECTIONS 799A AND 845 OF THE PUBLIC HEALTH SERVICE ACT Procedures § 83.20...

  4. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a...

  5. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a...

  6. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification...

  7. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  8. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  9. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  10. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  11. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  12. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  13. Interim Report - Grant AFOSR-85-0065.

    DTIC Science & Technology

    1985-06-30

    Option 065 Drafting Plotter 1 7475A 6 Pen Graphics Plotter Vendor: Imagen Corporation $ 11,266 1 Model 8/300 Laser Printer System, 512Kbytes memory 1... Imagen 8/300 Laser Printer 3 Interim Report Grant No. AFOSR-85-0065 was equivalent to the Versatec plotter for small plots and better for text output

  14. 340 waste handling facility interim safety basis

    SciTech Connect

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  15. NATO/CCMS pilot study: Evaluation of demonstrated and emerging technologies for the treatment and clean up of contaminated land and groundwater (phase 2). Interim status report number 203

    SciTech Connect

    1995-05-01

    The document provides an interim status report on the second phase of a Pilot Study designed to share information among countries on innovative treatment technologies. The report is divided into four parts. The first part contains abstracts of each of the technical case studies sanctioned by the Pilot Study prior to September 1994. The second part of the report contains preliminary information on 15 projects newly accepted by the Pilot Study in September 1994. The table on page 30 provides an overview of these projects. The third part contains summaries of guest presentations of general interest made at Pilot Study meetings. The fourth section of the report contains a brief description of NATO fellowships projects.

  16. Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment

    SciTech Connect

    Spiliotopoulos, Alexandros A.

    2013-03-20

    This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

  17. Fair dynamic arbitration for a multiprocessor communications bus

    SciTech Connect

    Knott, J.D.; Crockett, T.W.

    1982-09-01

    The finite element machine (FEM) is an experimental parallel computer consisting of an array of 36 asynchronous microcomputers. One method of interprocessor communication of FEM is a bi-directional parallel bus which uses a dynamic arbitration scheme to increase bus bandwidth. Testing of this bus revealed an imbalance in transfer rates for individual processors. The imbalance was traced to a defect in arbiter design, and two criteria were identified which must be met to ensure fair dynamic arbitration. These involve (1) priority sequencing, and (2) the efficiency of the arbiter. 3 references.

  18. Rethinking passive transport: bus fare exemptions and young people's wellbeing.

    PubMed

    Jones, Alasdair; Steinbach, Rebecca; Roberts, Helen; Goodman, Anna; Green, Judith

    2012-05-01

    Much recent public health research has emphasised the health impacts for young people of 'active travel' modes, typically defined as walking and cycling. Less research has focused on public transport modes. Drawing on qualitative data, we examine the links between bus travel and wellbeing in London, where young people currently have free bus travel. Our findings indicate that bus travel can be both a physically and socially active experience for young people. We suggest a more nuanced understanding of 'active travel' is now needed, alongside greater attention to urban public transport networks as key sites that impact on important determinants of wellbeing such as independent mobility and social inclusion.

  19. Impact of a walking school bus program on children’s active commuting to school and physical activity

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The Walking School Bus (WSB) pilot program was evaluated to determine the impact on student’s Active Commuting to School (ACS) and moderate-to vigorous- physical activity (MVPA). We conducted a randomized controlled trial in 8 low income, elementary schools in Houston, TX, USA. Students (n=149) wer...

  20. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies