Science.gov

Sample records for by-products planning interim

  1. AFCI Transmutation Fuel Processes and By-Products Planning: Interim Report

    SciTech Connect

    Eric L. Shaber

    2005-09-01

    dictates the need for detailed process flows, mass balances, batch size data, and radiological dose estimates. Full definition of the materials that will need to be handled in the facility as feed material inputs, in-process fuel, scrap recycle, scrap requiring recovery, and by-product wastes is required. The feed material for demonstrating transmutation fuel fabrication will need to come from the separations of actinides from spent nuclear fuel processed in the same AFCF.

  2. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  3. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  4. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  5. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  6. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    SciTech Connect

    SIMMONS, F.M.

    2000-12-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

  7. Single Shell Tank (SST) Interim Stabilization Project Plan

    SciTech Connect

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  8. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  9. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  10. Permitting plan for the high-level waste interim storage

    SciTech Connect

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  11. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide... § 52.243 Interim approval of the Carbon Monoxide plan for the South Coast. The Carbon Monoxide plan for... such earlier date the State has submitted as a SIP revision a demonstration that the carbon monoxide...

  12. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Interim approval of the Carbon Monoxide... § 52.243 Interim approval of the Carbon Monoxide plan for the South Coast. The Carbon Monoxide plan for... such earlier date the State has submitted as a SIP revision a demonstration that the carbon monoxide...

  13. T Tank Farm Interim Cover Test - Design Plan

    SciTech Connect

    Zhang, Z. F.; Keller, Jason M.

    2006-07-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  14. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  15. Interim rules amending ERISA disclosure requirements for group health plans--DoL. Interim rules with request for comments.

    PubMed

    1997-04-08

    This document contains interim rules governing the content of the summary plan description (SPD) for group health plans, the furnishing of summaries of material reductions in covered services or benefits by group health plans, and the disclosure of SPD and related information through electronic media. The rules contained in this document implement amendments to the disclosure provisions of the Employee Retirement Income Security Act of 1974 (ERISA) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). Interested persons are invited to submit comments on the interim rules for consideration by the Department in developing final rules. The rules contained in this document are being adopted on an interim basis to accommodate statutorily established time frames intended to ensure that sponsors and administrators of group health plans, as well as participants and beneficiaries covered by such plans, have timely guidance concerning compliance with the recently enacted amendments to ERISA.

  16. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  17. Interim rule amending Summary Plan Description regulation--Department of Labor. Interim rule with request for comments.

    PubMed

    1998-09-09

    This document contains an interim rule amending the information required to be contained in the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). Specifically, this rule amends the information required to be disclosed in the SPD with respect to the Newborns' and Mothers' Health Protection Act of 1996. The amendment contained in this document will affect group health plan sponsors, administrators, fiduciaries, participants, and beneficiaries.

  18. Interim rules for health insurance portability for group health plans--HCFA. Interim rules with request for comments.

    PubMed

    1997-04-08

    This document contains interim rules governing access, portability and renewability requirements for group health plans and issuers of health insurance coverage offered in connection with a group health plan. The rules contained in this document implement changes made to certain provisions of the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA), and the Public Health Service Act (PHS Act) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). Interested persons are invited to submit comments on the interim rules for consideration by the Department of Health and Human Services, the Department of Labor, and the Department of the Treasury (Departments) in developing final rules. The rules contained in this document are being adopted in an interim basis to accommodate statutorily established time frames intended to ensure that sponsors and administrators of group health plans, participants and beneficiaries, States, and issuers of group health insurance coverage have timely guidance concerning compliance with the recently enacted requirements of HIPAA.

  19. Process safety management and interim or remedial action plans

    SciTech Connect

    Boss, M.J.; Henney, D.A.; Heitzman, V.K.; Day, D.W.

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  20. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  1. Interim final rules prohibiting discrimination based on genetic information in health insurance coverage and group health plans. Interim final rules with request for comments.

    PubMed

    2009-10-07

    This document contains interim final rules implementing sections 101 through 103 of the Genetic Information Nondiscrimination Act of 2008. These provisions prohibit discrimination based on genetic information in health insurance coverage and group health plans.

  2. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype SIP... continue operating under the plans while revisions are developed to bring the prototype SIP company...

  3. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype SIP... continue operating under the plans while revisions are developed to bring the prototype SIP company...

  4. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype SIP... continue operating under the plans while revisions are developed to bring the prototype SIP company...

  5. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype SIP... continue operating under the plans while revisions are developed to bring the prototype SIP company...

  6. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    SciTech Connect

    RUNG, M.P.

    2000-06-20

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

  7. Interim-status groundwater monitoring plan for the 216-B-63 trench

    SciTech Connect

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  8. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-16

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms.

  9. Interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Interim final rules with request for comments.

    PubMed

    2010-06-17

    This document contains interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan.

  10. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... plans. 8.570 Section 8.570 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC VESSEL INSPECTION ALTERNATIVES Streamlined Inspection Program § 8.570 Interim approval... years. (b) A company that does not request approval as required by paragraph (a) of this section or does...

  11. DOUBLE TRACKS Test Site interim corrective action plan

    SciTech Connect

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  12. EPA Finalizes $9 Million Interim Cleanup Plan for Expanded Area at CTS of Asheville Inc. Superfund Site

    EPA Pesticide Factsheets

    ATLANTA - The U.S. Environmental Protection Agency has selected an interim cleanup plan to address contamination beneath the former plant at the CTS of Asheville Inc. Superfund Site. The North Carolina Department of Environmental Quality concurred w

  13. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    SciTech Connect

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  14. Disaster planning and mitigation technologies, interim technology inventory report. Interim report

    SciTech Connect

    Oggerino, J.; Rabinowitz, M.

    1998-11-01

    Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. The objective was to provide concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses. The project team identified technologies relevant to natural and person-caused disasters by searching both hard copy and electronic files from EPRI, the Public or Government sector, and the Private of Commercial Sector. The team evaluated technologies potentially suitable for inclusion in the inventory against a set of selection criteria and presented them in a standard format. The report contains fourteen Technology Information Briefs in final draft form. A Technology Information Brief is a document that describes in some detail a challenge of problem to be overcome; a solution presented by the subject technology; and, when available, cost and application experience for the products chosen. In addition, the report has a Hot Topics chapter, and chapters on both Relevant Publications and Internet Addresses.

  15. Linear Programming for Vocational Education Planning. Interim Report.

    ERIC Educational Resources Information Center

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  16. State Plan for Community Colleges in Maryland: Interim Report.

    ERIC Educational Resources Information Center

    Maryland State Board for Community Colleges, Annapolis.

    This annual report to the Governor of Maryland provides an abbreviated account of the activities of the state's community colleges, including institutional plans and objectives. Section I explains the mission and goals of the State Board for Community Colleges (SBCC) and for the institutions themselves, focusing on missions related to students,…

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  18. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan Under... and Insurance Oversight, Department of Health and Human Services. ACTION: Amendment to interim final... regulations implementing the rules for group health plans and health insurance coverage in the group...

  19. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  20. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  1. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  2. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    NASA Technical Reports Server (NTRS)

    Meer, Dave; Oriti, Sal

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, NASA?s Glenn Research Center (GRC) has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  3. Advanced Stirling Convertor Durability Testing: Plans and Interim Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Oriti, Salvatore M.

    2012-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. In support of this program, GRC has been involved in testing Stirling convertors, including the Advanced Stirling Convertor (ASC), for use in the ASRG. This testing includes electromagnetic interference/compatibility (EMI/EMC), structural dynamics, advanced materials, organics, and unattended extended operation. The purpose of the durability tests is to experimentally demonstrate the margins in the ASC design. Due to the high value of the hardware, previous ASC tests focused on establishing baseline performance of the convertors within the nominal operating conditions. The durability tests present the first planned extension of the operating conditions into regions beyond those intended to meet the product spec, where the possibility exists of lateral contact, overstroke, or over-temperature events. These tests are not intended to cause damage that would shorten the life of the convertors, so they can transition into extended operation at the conclusion of the tests. This paper describes the four tests included in the durability test sequence: 1) start/stop cycling, 2) exposure to constant acceleration in the lateral and axial directions, 3) random vibration at increased piston amplitude to induce contact events, and 4) overstroke testing to simulate potential failures during processing or during the mission life where contact events could occur. The paper also summarizes the analysis and simulation used to predict the results of each of these tests.

  4. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    SciTech Connect

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  5. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    NASA Technical Reports Server (NTRS)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  6. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  7. Detailed Skylab ECS consumables analysis for the interim revision flight plan (November, 1972, SL-1 launch)

    NASA Technical Reports Server (NTRS)

    Wells, C.; Kolkhorst, H. E.

    1971-01-01

    The consumables analysis was performed for the Skylab 2, 3, and 4 Preliminary Reference Interim Revision Flight Plan. The analysis and the results are based on the mission requirements as specified in the flight plan and on other available data. The results indicate that the consumables requirements for the Skylab missions allow for remaining margins (percent) of oxygen, nitrogen, and water nominal as follows: 83.5, 90.8, and 88.7 for mission SL-2; 57.1, 64.1, and 67.3 for SL-3; and 30.8, 44.3, and 46.5 for SL-4. Performance of experiment M509 as scheduled in the flight plan results in venting overboard the cluster atmosphere. This is due to the addition of nitrogen for propulsion and to the additional oxygen introduced into the cabin when the experiment is performed with the crewman suited.

  8. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    SciTech Connect

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

  9. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    SciTech Connect

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  10. RESEARCH PLAN FOR MICROBIAL PATHOGENS AND DISINFECTION BY-PRODUCTS IN DRINKING WATER

    EPA Science Inventory

    This research plan was developed to describe research needed to support EPA's development of drinking water regulations concerning disinfectants, disinfection by-products (DBPs) and microbial pathogens, focusing on key scientific and technical information needed. The research pl...

  11. RESEARCH PLAN FOR MICROBIAL PATHOGENS AND DISINFECTION BY-PRODUCTS IN DRINKING WATER

    EPA Science Inventory

    This research plan was developed to describe research needed to support EPA's development of drinking water regulations concerning disinfectants, disinfection by-products (DBPs) and microbial pathogens, focusing on key scientific and technical information needed. The research pl...

  12. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    SciTech Connect

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  13. National climate change action plans: Interim report for developing and transition countries

    SciTech Connect

    Benioff, R.; Ness, E.; Hirst, J.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  14. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    SciTech Connect

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  15. T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan

    SciTech Connect

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-09-27

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  16. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    SciTech Connect

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  17. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    SciTech Connect

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action.

  18. Sampling and analysis plan for Wayne Interim Storage Site (WISS), Wayne, New Jersey

    SciTech Connect

    Brown, K.S.; Murray, M.E.; Rodriguez, R.E.

    1998-10-01

    This field sampling plan describes the methodology to perform an independent radiological verification survey and chemical characterization of a remediated area of the subpile at the Wayne Interim Storage Site, Wayne, New Jersey.Data obtained from collection and analysis of systematic and biased soil samples will be used to assess the status of remediation at the site and verify the final radiological status. The objective of this plan is to describe the methods for obtaining sufficient and valid measurements and analytical data to supplement and verify a radiological profile already established by the Project Remediation Management Contractor (PMC). The plan describes the procedure for obtaining sufficient and valid analytical data on soil samples following remediation of the first layer of the subpile. Samples will be taken from an area of the subpile measuring approximately 30 m by 80 m from which soil has been excavated to a depth of approximately 20 feet to confirm that the soil beneath the excavated area does not exceed radiological guidelines established for the site or chemical regulatory limits for inorganic metals. After the WISS has been fully remediated, the Department of Energy will release it for industrial/commercial land use in accordance with the Record of Decision. This plan provides supplemental instructions to guidelines and procedures established for sampling and analysis activities. Procedures will be referenced throughout this plan as applicable, and are available for review if necessary.

  19. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  20. Resource Conservation and Recovery Act (RCRA) Closure Plan Summary for Interim reasctive Waste Treatment Area (IRWTA)

    SciTech Connect

    Collins, E.T.

    1997-07-01

    This closure plan has been prepared for the interim Reactive Waste Treatment Area (IRWT'A) located at the Y-12 Pkmt in oak Ridge, Tennessee (Environmental Protection Agency [EPA] Identification TN 389-009-0001). The actions required to achieve closure of the IRWTA are outlined in this plan, which is being submitted in accordance with Tennessee Ruie 1200- 1-1 1-.0S(7) and Title 40, Code of Federal Regulations (CFR), Part 265, Subpart G. The IRWTA was used to treat waste sodium and potassium (NaK) that are regulated by the Resource Conservation and Recovery Act (RCRA). The location of the IRWT'A is shown in Figures 1 and 2, and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.and a diagram is shown in Figure 3. This pkm details all steps that wdi be petiormed to close the IRWTA. Note that this is a fmai ciosure.

  1. Interim Economic and Social Development Plan, 1983-1986. [Selected provisions].

    PubMed

    1989-01-01

    The Comoros interim economic and social development plan, 1983-86, contained provisions relating to family planning (FP), maternal and child health, and population education. Without FP, the high demographic growth rate in Comoros would increase even further. When this growth is added to the reduced infant mortality rate and the expected increased life expectancy of adults due to improvements in sanitary and nutritional conditions, demographic pressure will become intolerable, the attainment of social objectives will be delayed, and improvement in the quality of life of the population will be slowed. A FP program will be instituted as soon as possible to provide education and information and place contraceptive material freely at the disposal of the people. As part of the A.I.D. project which will help realize these goals, a division of FP will be created in the Ministry of Public Health, the pharmaceutical supply network will be decentralized, a detailed labor plan will be created for each sector, and a master plan will be implemented for the establishment and modernization of a network of hospitals. The project depends on construction of 2 maternal-child health clinics and the and the revival of an unspecified number of sanitary posts. A new building will be necessary for the central pharmacy, and a warehouse for pharmaceutical products will be needed on each island. Technical assistance will amount to 168 million Comoran francs, with the cost rising to 690 million Comoran francs after 1982. These costs will be financed by an A.I.D. loan and by a 4.7% contribution from the Comoran government.

  2. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  3. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  4. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  5. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  6. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Interim final rules with request for comments.

    PubMed

    2011-08-03

    This document contains amendments to the interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding preventive health services.

  7. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  8. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  9. Interim final rules for group health plans and health insurance issuers relating to internal claims and appeals and external review processes under the Patient Protection and affordable Care Act. Interim final rules with request for comments.

    PubMed

    2010-07-23

    This document contains interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under the Patient Protection and Affordable Care Act. The regulations will generally affect health insurance issuers; group health plans; and participants, beneficiaries, and enrollees in health insurance coverage and in group health plans. The regulations provide plans and issuers with guidance necessary to comply with the law.

  10. Interim Principals.

    ERIC Educational Resources Information Center

    Beem, Kate

    2003-01-01

    An interim principal can buy a school district time to land a permanent successor. Also lists where to find an interim principal; the interim's steadying influence; Bob Wallace's wild ride as an interim principal in post-retirement; and Roger Prosise's rationale for turning to an interim appointment. (MLF)

  11. Interim rules for group health plans and health insurance issuers under the Newborns' and Mothers' Health Protection Act--IRS; DoL; HCFA. Interim rules with request for comments.

    PubMed

    1998-10-27

    This document contains interim rules governing the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). The interim rules provide guidance to employers, group health plans, health insurance issuers, and participants and beneficiaries relating to new requirements for hospital lengths of stay in connection with childbirth. The rules contained in this document implement changes to the Employee Retirement Income Security Act of 1974 (ERISA) and the Public Health Service Act (PHS Act) made by NMHPA, and changes to the Internal Revenue Code of 1986 (Code) enacted as part of the Taxpayer Relief Act of 1997 (TRA '97). Interested persons are invited to submit comments on the interim rules for consideration by the Department of the Treasury, the Department of Labor, and the Department of Health and Human Services (Departments) in developing final rules.

  12. 75 FR 12217 - Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Assessment. The Corps is directed to conduct a study of technologies that may enhance the efficacy of the... reports. Interim Report IIIa, limited to the impacts of implementing additional in- stream barrier/deterrent technologies at key locations in the Illinois and Chicago Area Waterways is the focus of...

  13. Technical considerations related to interim source-term assumptions for emergency planning and equipment qualification. [PWR; BWR

    SciTech Connect

    Niemczyk, S.J.; McDowell-Boyer, L.M.

    1982-09-01

    The source terms recommended in the current regulatory guidance for many considerations of light water reactor (LWR) accidents were developed a number of years ago when understandings of many of the phenomena pertinent to source term estimation were relatively primitive. The purpose of the work presented here was to develop more realistic source term assumptions which could be used for interim regulatory purposes for two specific considerations, namely, equipment qualification and emergency planning. The overall approach taken was to adopt assumptions and models previously proposed for various aspects of source term estimation and to modify those assumptions and models to reflect recently gained insights into, and data describing, the release and transport of radionuclides during and after LWR accidents. To obtain illustrative estimates of the magnitudes of the source terms, the results of previous calculations employing the adopted assumptions and models were utilized and were modified to account for the effects of the recent insights and data.

  14. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  15. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  16. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  17. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    SciTech Connect

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  18. Learning Outcomes in Vocational Education: A Business Plan Development by Production-Based Learning Model Approach

    ERIC Educational Resources Information Center

    Kusumaningrum, Indrati; Hidayat, Hendra; Ganefri; Anori, Sartika; Dewy, Mega Silfia

    2016-01-01

    This article describes the development of a business plan by using production-based learning approach. In addition, this development also aims to maximize learning outcomes in vocational education. Preliminary analysis of curriculum and learning and the needs of the market and society become the basic for business plan development. To produce a…

  19. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days following the receipt of the HMO's or CMP's final interim cost and enrollment reports, CMS will make...

  20. 77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... critical to the economic vitality of the United States, renewed attention to safe and efficient freight... Freight Plans may be organized in any structure that works best for individual States, as long as they... that work together to plan for freight transportation along key multi-state freight corridors, in...

  1. National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.

    ERIC Educational Resources Information Center

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…

  2. United States Air Force 611th Civil Engineer Squadron, Elmendorf AFB, Alaska. Cape Lisburne Long Range Radar Station, Alaska. Quality program plan, addendum for interim remedial actions. Final

    SciTech Connect

    1996-12-01

    The Air Force is conducting interim remedial action at Cape Lisburne Long Range Radar Station (LRRS) as part of the Installation Restoration Program (IRP). The remedial actions are to be conducted at Sites LF01 (Landfill and Waste Accumulation Area No. 2/Dump No. 1), SS03 (White Alice Site), SS08 (Upper Camp Transformer Building) and SS09 (Lower Camp Transformer Building). This QPP is site-specific to work at the Cape Lisburne LRRS, and is an addendum to the Program Quality Program Plan (QPP) dated June 1995. This QPP Addendum includes: Construction Quality Plan (includes Waste Plan); Health and Safety Plan; and Sampling and Analysis Plan, including Quality Assurance Project Plan and Field Sampling Plan.

  3. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110.

  4. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  5. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  6. Hydrazine Blending and Storage Facility, Interim Response Action Implementation, Final Sampling Design Plan. Appendix A to Task Plan

    DTIC Science & Technology

    1989-08-30

    Waste Streams, EPA-600/2-80-018, January 1980. GCA Corporation, Quality Assurance Plan, Love Canal Study - Appendix A, Sampling Procedures, EPA Contract...subsequent disposal. &ources GCA Corporation, Quality Assurance Plan, Love Canal Study - Appendix A, Sampling Procedures, EPA Contract 68-02-3168.I I I U

  7. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... gates, and fish ladder, and regulate the water level upstream of Keno Dam in accordance with the... Fish and Wildlife Service Draft Environmental Assessment and Proposed Habitat Conservation Plan for the..., and Siskiyou County, CA AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of...

  8. INTERIM EPA GUIDANCE FOR GEOSPATIAL-RELATED QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    This guidance supplements EPA Guidance for Quality,Assurance Project Plans (EPA QA/G-5), in that the focus here is on collection and use of geospatial rather than other environmental data (e.g., strictly chemical or biological data), including unique aspects of data storage, retr...

  9. Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1

    SciTech Connect

    Williams, Bruce A.

    2003-11-25

    During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan.

  10. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    functions , capabilities, and limitations of respirators; donning and fit testing ; proper wearing; and maintenance. If necessary, training will be...buildup of microscopic asbestos fibers. The scarring causes decrk ased pulmonary function , leading to a number of secondary complications, and...at RMA. Phase I includes planning, wastewater treatment system selection and modification (including bench/pilot-scale testing ), full-scale system

  11. INTERIM EPA GUIDANCE FOR GEOSPATIAL-RELATED QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    This guidance supplements EPA Guidance for Quality,Assurance Project Plans (EPA QA/G-5), in that the focus here is on collection and use of geospatial rather than other environmental data (e.g., strictly chemical or biological data), including unique aspects of data storage, retr...

  12. Traffic circulation study and long-range plan for Del Rio. Interim research report

    SciTech Connect

    Weissmann, A.J.; Islam, R.

    1996-03-01

    A 1992 report to Congress, pursuant to Intermodal Surface Transportation Efficiency Act (ISTEA) sections 1089 and 6015, acknowledges that Texas serves a disproportionate share of the U.S.-Mexico international trade, and, accordingly, recommends the development of federal-aid program options to improve transportation infrastructure related to international trade. In order to take advantage of this recommendation, border states must monitor their transborder traffic demand and develop traffic circulation plans for their border cities. This report presents a 25-year traffic circulation plan for the City of Del Rio, Texas. The plan includes recommendations for increasing roadway capacity, adding left-turn lanes, building new routes to relieve congestion, and adding international thoroughfares. It also includes a comprehensive analysis of a transborder traffic in Del Rio, as well as of international thoroughfares between Cuidad Acuna and Del Rio. The recommendations take into account input from TxDOT personnel, City officials, border inspectors, international bridge managers, and several Mexican officials. The recommendations and schedules discussed in this report can assist TxDOT not only in planning land transport infrastructure, but also in alleviating problems associated with additional highway capacity, pavement rehabilitation, signalization, and right-of-way.

  13. The Follow Through Planned Variation Experiment; Volume V. Appendix: Analysis of Interim Follow Through Evaluation Reports.

    ERIC Educational Resources Information Center

    Villaume, John; Haney, Walt

    This report is the appendix to the last volume in a five volume series on the national evaluation study of the Follow Through Planned Variation Model. The appendix is organized in three sections. Section I provides detailed summaries of five major national Follow Through evaluation reports not published as part of this series. Section II is an…

  14. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  15. California State Implementation Plan; Los Angeles-South Coast Air Basin; Interim Final Determination To Defer Sanctions

    EPA Pesticide Factsheets

    EPA is making an interim final determination to defer the imposition of offset and highway sanctions in the Los Angeles-South Coast air basin based on a proposed approval of revisions to the California SIP.

  16. U.S. Air Force Proposes Plan for Interim Remedial Action for PCB contaminated Soils

    DTIC Science & Technology

    1993-06-01

    Repository" listed on page 15 of this Proposed Plan. Superfund is the common name for the Comprehensive Environmental Response, You are encouraged to...review and comment on all Compensation, and Liability Act ( CERCLA ). This alternatives considered, including the preferred is a federal law enacted in 1980...and was amended alternative and other relevant documents, which by the Superfund Amendments and Reauthonzation constitute the Administrative Record

  17. Human Research Program Integrated Research Plan: December 20, 2007, Interim Baseline

    NASA Technical Reports Server (NTRS)

    2008-01-01

    The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration. This Integrated Research Plan (IRP) describes the program s research activities that are intended to address the needs of human space exploration and serve HRP customers. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration. The document serves several purposes for the Human Research Program: The IRP provides a means to assure that the most significant risks to human space explorers are being adequately mitigated and/or addressed, The IRP shows the relationship of research activities to expected outcomes and need dates, The IRP shows the interrelationships among research activities that may interact to produce products that are integrative or cross defined research disciplines, The IRP illustrates the non-deterministic nature of research and technology activities by showing expected decision points and potential follow-on activities, The IRP shows the assignments of responsibility within the program organization and, as practical, the intended solicitation approach, The IRP shows the intended use of research platforms such as the International Space Station, NASA Space Radiation Laboratory, and various space flight analogs. The IRP does not show all budgeted activities of the Human research program, as some of these are enabling functions, such as management, facilities and infrastructure

  18. Disaster planning and mitigation technologies, interim technology inventory report: Report {number_sign}2

    SciTech Connect

    Oggerino, J.; Rabinowitz, M.

    1998-06-01

    Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. Each year, 10,000 violent thunderstorms, 5,000 floods, and 1,000 tornadoes strike the US. These and other natural events have cost at least $8 billion per year over the last 30 years, and the annual costs are increasing rapidly. In 1996, the US experienced twice the yearly average of declared disasters than in the previous twenty years. Damage from Hurricane Andrew and the Northridge earthquake resulted in losses of $30 and $25 billion respectively. As a result of these and other costly disasters, utilities are losing business and commercial customers. In response, federal, state, and local organizations have steeped up efforts to deploy mitigation technologies and techniques and business recovery support. A task within the EPRI Disaster Planning and Mitigation Technologies (DP and MT) Target seeks to identify technologies that can help utilities and their customers prepare for and recover from natural disasters. This report provides concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses.

  19. Medicare program; revisions to the Medicare Advantage and prescription drug benefit programs: clarification of compensation plans. Interim final rule with comment period.

    PubMed

    2008-11-14

    This interim final rule with comment period (IFC) revises the regulations governing the Medicare Advantage (MA) program (Part C), and prescription drug benefit program (Part D). This IFC sets forth new requirements governing the marketing of Part C and Part D plans which by statute must be in place at a date specified by the Secretary, but no later than November 15, 2008. The new marketing requirements, which set forth new limits on the compensation that can be paid to agents or brokers with respect to Part C and Part D plans, are based on authority under provisions in the Medicare Improvements for Patients and Providers Act (MIPPA) that became law on July 15, 2008.

  20. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    SciTech Connect

    Not Available

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility`s operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent`s Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement.

  1. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.570 Section 417... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment. (1) CMS makes monthly advance payments equivalent to the HMO's or CMP's interim per capita rate...

  2. Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment.

  3. Project Canada West. Interim Report.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    This first interim report of project Canada West, initiated in April, 1970, includes three papers. "Curriculum Development in Urbanization," by Dr. R. H. Sabey, Acting Executive Director, is an overview of the Project's history, purpose, and the 5 year plan for phases of research development. (See SO 000 283 for complete abstract.) Two…

  4. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... implementing the rules for group health plans and health insurance coverage in the group and individual markets... issuers in the group and individual markets. The term ``group health plan'' includes both insured and self... market provisions over group and individual health insurance issuers. HHS enforces these provisions with...

  5. Computer-Based Exercises in Anemia and Chest Pain Diagnosis: An Interim Evaluation of the PlanAlyzer Project

    PubMed Central

    Lyon, Harold C.; Healy, James C.; Bell, James R.; O'Donnell, Joseph F.; Hirai, Frank; Moore-West, Margaret; Cornwell, Gibbons G.; Brooks, W. Blair; Spackman, Kent A.; Beck, J. Robert

    1990-01-01

    PlanAlyzer is a microcomputer-based, self-paced, case-based, event-driven system for medical education. Aimed at the second year medical student, PlanAlyzer presents cases, elicits and critiques a student's approach to the diagnosis of two common medical disorders: anemias and chest pain. PlanAlyzer uses text, hypertext, images and critiquing theory. Students were randomized, one half becoming the experimental group who received the interactive PlanAlyzer cases in anemia, the other half becoming the controls who received the exact same content material in a text format. Later in each year there was a crossover, the controls becoming the experimentals for a similar intervention with the cardiology PlanAlyzer cases. Preliminary results at the end of the first two trials shows that the programs have achieved most of the proposed instructional objectives, plus some significant efficiency and economy gains. 96 faculty hours of classroom time were saved by using PlanAlyzer in their place, while, maintaining high student achievement. In terms of student proficiency and efficiency, the 176 students in the trial were able to accomplish the project's instructional objectives, and the experimentals accomplished this in less time than the controls. The research suggests additional inquiry in several areas: better evaluation instruments to measure the problem solving skills PlanAlyzer was designed to teach; use of hypertext PlanAlyzer cases to find if such a mode results in performance and/or efficiency differences; through the addition of interactive video, broaden PlanAlyzer to include additional behaviors subsumed under the topic of clinical problem solving, such as patient management strategies and the role of patients' affective behavior and non-verbal cues in the data gathering process.

  6. Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Whitney L. Morrison; Daprato, Rebecca C.

    2016-01-01

    This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

  7. Administrative simplification: adoption of operating rules for eligibility for a health plan and health care claim status transactions. Interim final rule with comment period.

    PubMed

    2011-07-08

    Section 1104 of the Administrative Simplification provisions of the Patient Protection and Affordable Care Act (hereafter referred to as the Affordable Care Act) establishes new requirements for administrative transactions that will improve the utility of the existing HIPAA transactions and reduce administrative costs. Specifically, in section 1104(b)(2) of the Affordable Care Act, Congress required the adoption of operating rules for the health care industry and directed the Secretary of Health and Human Services to "adopt a single set of operating rules for each transaction * * * with the goal of creating as much uniformity in the implementation of the electronic standards as possible." This interim final rule with comment period adopts operating rules for two Health Insurance Portability and Accountability Act of 1996 (HIPAA) transactions: eligibility for a health plan and health care claim status. This rule also defines the term "operating rules" and explains the role of operating rules in relation to the adopted transaction standards. In general, transaction standards adopted under HIPAA enable electronic data interchange through a common interchange structure, thus minimizing the industry's reliance on multiple formats. Operating rules, in turn, attempt to define the rights and responsibilities of all parties, security requirements, transmission formats, response times, liabilities, exception processing, error resolution and more, in order to facilitate successful interoperability between data systems of different entities.

  8. Grant Computer Managed Individualized Learning Project (PLAN*). The interim Evaluation Report (July 1, 1972-June 30, 1973).

    ERIC Educational Resources Information Center

    Saint Louis Board of Education, MO.

    Four instructional management programs, the Duluth Project, IGE Project, the IPI Project, and PLAN Project, were evaluated, contrasted, and compared with development of an inhouse program for the St. Louis public schools. The main criteria were: developmental and operational costs; degree of individualization; the use of behavioral objectives,…

  9. Education as Experimentation: A Planned Variation Model. Volume IIIA: Findings: Cohort II; Interim Findings: Cohort III. Volume IIIB: Appendices.

    ERIC Educational Resources Information Center

    Stebbins, Linda B.; And Others

    This segment of the national evaluation study of the Follow Through Planned Variation Model reviews the background of the study, describes 13 of the Follow Through models involved, and presents an analysis of the effects of these models on students. The analysis is based on data from 4 years of Follow Through participation by Cohort II children…

  10. Cost allocation plans for public assistance programs--Health and Human Services Department. Interim final rule with comment period.

    PubMed

    1982-04-23

    This rule revises existing regulations concerning the preparation, submission and approval of State agency cost allocation plans used in computing claims for Federal Financial Participation under public assistance programs. It also reflects the transfer of responsibility for review and approval of the plans to the Division of Cost Allocation (DCA) in the Department's regional offices. This responsibility was previously assigned to the Social and Rehabilitation Service which was abolished by Secretarial Order published on March 9, 1977 (42 FR 13262). The current rule has been rewritten so that it is clearer, easier to understand and more specific. The Department's Informal Grant Appeals regulation relative to cost allocation plans and indirect cost rates (45 CFR Part 75) is also being updated and revised to make it consistent with Supart E, Cost allocation plans, of 45 CFR Part 95, General administration--grant programs (public assistance and medical assistance). Although these regulations are final, the Department has decided to invite public comments for the reasons described in the Supplementary Information below. Comments may be submitted in the manner described below. If changes are needed as a result of the comments received, those changes will be published in the Federal Register along with the comments received and the Department's responses to those comments.

  11. A Guide for Planning Facilities for Occupational Preparation Programs in the Machine Trades. Interim Report. Research 24.

    ERIC Educational Resources Information Center

    Larson, Milton E.

    This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…

  12. A Guide for Planning Facilities for Occupational Preparation Programs in Business and Office Occupations. Interim Report. Research 26.

    ERIC Educational Resources Information Center

    Selden, William

    The guide was developed as a facility planning tool for use by business education instructors, state supervisors, university school planners, and local school officials. It lists a series of questions about the educational program to be offered, the answers to which bear directly on the numbers and kind of instructional areas needed in the…

  13. Rulemaking to Affirm Interim Amendments to Dates in Federal Implementation Plans Addressing Interstate Transport of Ozone and Fine Particulate Matter (81 FR 13275)

    EPA Pesticide Factsheets

    This rulemaking affirms and makes permanent certain amendments previously made on an interim basis to the Code of Federal Regulations (CFR) provisions implementing the Cross-State Air Pollution Rule (CSAPR).

  14. Randomized Controlled Trial of Forward-Planned Intensity Modulated Radiotherapy for Early Breast Cancer: Interim Results at 2 Years

    SciTech Connect

    Barnett, Gillian C.; Wilkinson, Jennifer S.; Moody, Anne M.; Wilson, Charles B.; Twyman, Nicola; Wishart, Gordon C.; Burnet, Neil G.; Coles, Charlotte E.

    2012-02-01

    Purpose: This single-center randomized trial was designed to investigate whether intensity-modulated radiotherapy (IMRT) reduces late toxicity in patients with early-stage breast cancer. Methods and Materials: The standard tangential plans of 1,145 nonselected patients were analyzed. The patients with inhomogeneous plans were randomized to a simple method of forward-planned IMRT or standard radiotherapy (RT). The primary endpoint was serial photographic assessment of breast shrinkage. Results: At 2 years, no significant difference was found in the development of any photographically assessed breast shrinkage between the patients randomized to the interventional or control group (odds ratio, 1.51; 95% confidence interval, 0.83-1.58; p = .41). The patients in the control group were more likely to develop telangiectasia than those in the IMRT group (odds ratio, 1.68; 95% confidence interval 1.13-2.40; p = .009). Poor baseline surgical cosmesis resulted in poor overall cosmesis at 2 years after RT. In patients who had good surgical cosmesis, those randomized to IMRT were less likely to deteriorate to a moderate or poor overall cosmesis than those in the control group (odds ratio, 0.63; 95% confidence interval, 0.39-1.03, p = .061). Conclusions: IMRT can lead to a significant reduction in telangiectasia at comparatively early follow-up of only 2 years after RT completion. An important component of breast induration and shrinkage will actually result from the surgery and not from the RT. Surgical cosmesis is an important determinant of overall cosmesis and could partially mask the longer term benefits of IMRT at this early stage.

  15. Randomized controlled trial of forward-planned intensity modulated radiotherapy for early breast cancer: interim results at 2 years.

    PubMed

    Barnett, Gillian C; Wilkinson, Jennifer S; Moody, Anne M; Wilson, Charles B; Twyman, Nicola; Wishart, Gordon C; Burnet, Neil G; Coles, Charlotte E

    2012-02-01

    This single-center randomized trial was designed to investigate whether intensity-modulated radiotherapy (IMRT) reduces late toxicity in patients with early-stage breast cancer. The standard tangential plans of 1,145 nonselected patients were analyzed. The patients with inhomogeneous plans were randomized to a simple method of forward-planned IMRT or standard radiotherapy (RT). The primary endpoint was serial photographic assessment of breast shrinkage. At 2 years, no significant difference was found in the development of any photographically assessed breast shrinkage between the patients randomized to the interventional or control group (odds ratio, 1.51; 95% confidence interval, 0.83-1.58; p = .41). The patients in the control group were more likely to develop telangiectasia than those in the IMRT group (odds ratio, 1.68; 95% confidence interval 1.13-2.40; p = .009). Poor baseline surgical cosmesis resulted in poor overall cosmesis at 2 years after RT. In patients who had good surgical cosmesis, those randomized to IMRT were less likely to deteriorate to a moderate or poor overall cosmesis than those in the control group (odds ratio, 0.63; 95% confidence interval, 0.39-1.03, p = .061). IMRT can lead to a significant reduction in telangiectasia at comparatively early follow-up of only 2 years after RT completion. An important component of breast induration and shrinkage will actually result from the surgery and not from the RT. Surgical cosmesis is an important determinant of overall cosmesis and could partially mask the longer term benefits of IMRT at this early stage. Copyright © 2012 Elsevier Inc. All rights reserved.

  16. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... water for the natural system provided by the Plan in five-year increments that begin in 2005, with the...

  17. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural... section. (c) Principles for developing interim goals. (1) RECOVER, using best available science and... water for the natural system provided by the Plan in five-year increments that begin in 2005, with the...

  18. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  19. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  20. Optimal timing for interim analyses in clinical trials.

    PubMed

    Togo, Kanae; Iwasaki, Manabu

    2013-01-01

    In clinical trials, interim analyses are often performed before the completion of the trial. The intention is to possibly terminate the trial early or adjust the sample size. The time of conducting an interim analysis affects the probability of the early termination and the number of subjects enrolled until the interim analysis. This influences the expected total number of subjects. In this study, we examine the optimal time for conducting interim analyses with a view to minimizing the expected total sample size. It is found that regardless of the effect size, the optimal time of one interim analysis for the early termination is approximately two-thirds of the planned observations for the O'Brien-Fleming type of spending function and approximately half of the planned observations for the Pocock type when the subject enrollment is halted for the interim analysis. When the subject enrollment is continuous throughout the trial, the optimal time for the interim analysis varies according to the follow-up duration. We also consider the time for one interim analysis including the sample size adjustment in terms of minimizing the expected total sample size.

  1. Vismodegib in patients with advanced basal cell carcinoma (STEVIE): a pre-planned interim analysis of an international, open-label trial.

    PubMed

    Basset-Seguin, Nicole; Hauschild, Axel; Grob, Jean-Jacques; Kunstfeld, Rainer; Dréno, Brigitte; Mortier, Laurent; Ascierto, Paolo A; Licitra, Lisa; Dutriaux, Caroline; Thomas, Luc; Jouary, Thomas; Meyer, Nicolas; Guillot, Bernard; Dummer, Reinhard; Fife, Kate; Ernst, D Scott; Williams, Sarah; Fittipaldo, Alberto; Xynos, Ioannis; Hansson, Johan

    2015-06-01

    The Hedgehog pathway inhibitor vismodegib has shown clinical benefit in patients with advanced basal cell carcinoma and is approved for treatment of patients with advanced basal cell carcinoma for whom surgery is inappropriate. STEVIE was designed to assess the safety of vismodegib in a situation similar to routine practice, with a long follow-up. In this multicentre, open-label trial, adult patients with histologically confirmed locally advanced basal cell carcinoma or metastatic basal cell carcinoma were recruited from regional referral centres or specialist clinics. Eligible patients were aged 18 years or older with an Eastern Cooperative Oncology Group (ECOG) performance status of 0-2, and adequate organ function. Patients with locally advanced basal cell carcinoma had to have been deemed ineligible for surgery. All patients received 150 mg oral vismodegib capsules once a day on a continuous basis in 28-day cycles. The primary objective was safety (incidence of adverse events until disease progression or unacceptable toxic effects), with assessments on day 1 of each treatment cycle (28 days) by principal investigator and coinvestigators at the site. Efficacy variables were assessed as secondary endpoints. The safety evaluable population included all patients who received at least one dose of study drug. Patients with histologically confirmed basal cell carcinoma who received at least one dose of study drug were included in the efficacy analysis. An interim analysis was pre-planned after 500 patients achieved 1 year of follow-up. This trial is registered with ClinicalTrials.gov, number NCT01367665. The study is still ongoing. Between June 30, 2011, and Nov 6, 2014, we enrolled 1227 patients. At clinical cutoff (Nov 6, 2013), 499 patients (468 with locally advanced basal cell carcinoma and 31 with metastatic basal cell carcinoma) had received study drug and had the potential to be followed up for 12 months or longer. Treatment was discontinued in 400 (80

  2. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  3. 75 FR 52597 - Availability of Interim Procedures for Federal External Review and Model Notices Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... include a transition period for plan years (in the individual market, policy years) beginning before July... protections so that the State process will continue to apply after the end of the transition period. For plans... and that will apply after this interim period. During the period that this interim enforcement safe...

  4. Approval of information collection requirements for the joint interim rules for health insurance portability for group health plans, and the individual market health insurance reform: portability from group to individual coverage; federal rules for access in the individual market; state alternative mechanisms to federal rules--IRS, DOL, HCFA. Interim rules with request for comments; approval of information collection requirements.

    PubMed

    1997-07-02

    On April 8, 1997, the Department of the Treasury, the Department of Labor, and the Department of Health and Human Services (Departments) published joint interim rules governing the access, portability and renewability requirements for group health plans and issuers offering group health insurance coverage in connection with a group health plan. The rules implemented changes made to certain provisions of the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA), and the Public Health Service Act (PHS Act) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). In the April 8 publication, the Departments submitted the group market information collection requirements, for, among other things, establishing creditable coverage, notice of special enrollment rights, and notice of pre-existing condition exclusion periods, to be Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1995 (PRA 95). In addition, on April 8, 1997 the Department of Health and Human Services submitted the HIPAA individual market information collection requirements to OMB for emergency review under the PRA 1995. This document amends the April 8 Federal Register documents to properly display the OMB control numbers.

  5. Intel International Interim Report

    ERIC Educational Resources Information Center

    Martin, Wendy; Mandinach, Ellen; Kanaya, Tomoe; Culp, Katie McMillan

    2004-01-01

    This interim report presents preliminary data and observations from evaluations of Intel Teach to the Future being conducted around the world, and recommendations for building and refining this evaluation portfolio to ensure that findings will be instructive at the local, national and international level. The data presented here reflect the…

  6. Online Education Interim Report

    ERIC Educational Resources Information Center

    Protopsaltis, Spiros, Ed.

    2007-01-01

    This interim report produced by the Colorado State Board of Education Online Education Task Force examines key issues related to online education. Task force members agree that: (1) online education has become a viable element of Colorado's public education system; (2) the role of technology in educating our children will continue to grow; and (3)…

  7. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Bureau of Indian Affairs Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines... publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements... Interim BIA Adult Detention Facility Guidelines and Interim Model Deputation Agreements are effective on...

  8. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  9. 33 CFR 154.1025 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Operating restrictions and interim operating authorization. 154.1025 Section 154.1025 Navigation and Navigable Waters COAST GUARD... BULK Response Plans for Oil Facilities § 154.1025 Operating restrictions and interim...

  10. By-Product Feeds

    USDA-ARS?s Scientific Manuscript database

    By-product feeds are generated from the production of food, fiber, and bio-energy products for human consumption. They include plant feedstuffs such as hulls, stalks, peels, and oil seed meals, and animal by-products such as blood meal, fats, bone meal, or processed organ meats. Some feed by-product...

  11. EPA Invites Public Comment on Interim Cleanup Plan for CTS of Asheville Inc. Superfund Site, Public Meeting Set for October 13

    EPA Pesticide Factsheets

    ATLANTA - The U.S. Environmental Protection Agency has proposed a plan to address contamination beneath the former plant at the CTS of Asheville Inc. Superfund Site in Asheville, N.C. A key step in moving forward is receiving the public's feedback.

  12. THE PRESENT STATUS OF SCHOOL DESEGREGATION AND PLANS TO FURTHER FACILITATE THE TRANSITION OF EDUCATIONAL PROGRAMS IN SUSSEX COUNTY, DELAWARE.... INTERIM REPORT.

    ERIC Educational Resources Information Center

    CORNING, HOBART M.

    THIS REPORT INDICATES THAT EACH SCHOOL DISTRICT IN SUSSEX COUNTY HAS CARRIED OUT PREVIOUSLY FORMULATED PLANS TO PREPARE FOR THE CHANGE FROM UNIRACIAL TO BIRACIAL SCHOOLS. TEN ALL-NEGRO SCHOOLS HAVE BEEN PHASED OUT, AND STUDENTS AND MOST OF THE STAFF HAVE BEEN ABSORBED INTO FORMERLY ALL-WHITE SCHOOLS. SOME INTEGRATED ACTIVITIES FOR STUDENTS AND…

  13. Bioventing Test Work Plan and Interim Test Results Report for Underground Storage Tanks Located at Building 7705, Westover Air Force Base, Massachusetts

    DTIC Science & Technology

    1993-12-01

    storage tanks (USTs) at Building 7705 (Pump House) at Westover AFB, Massachusetts. The pilot test has three primary objectives: 1) to assess the...This test work plan presents the scope of an in situ bioventing pilot test for treatment of fuel contaminated soils associated with the underground

  14. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  15. Interim Assessments: A User's Guide

    ERIC Educational Resources Information Center

    Marshall, Kim

    2008-01-01

    Interim assessments are hot in American schools. Also called benchmark or periodic tests, these assessments are given every four to nine weeks to check on students' progress. Although interim assessments are an important tool for school improvement, they are easy to misuse. In the author's work coaching principals in a number of districts, he has…

  16. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  17. Sequential interim analyses of survival data in DNA microarray experiments

    PubMed Central

    2011-01-01

    Background Discovery of biomarkers that are correlated with therapy response and thus with survival is an important goal of medical research on severe diseases, e.g. cancer. Frequently, microarray studies are performed to identify genes of which the expression levels in pretherapeutic tissue samples are correlated to survival times of patients. Typically, such a study can take several years until the full planned sample size is available. Therefore, interim analyses are desirable, offering the possibility of stopping the study earlier, or of performing additional laboratory experiments to validate the role of the detected genes. While many methods correcting the multiple testing bias introduced by interim analyses have been proposed for studies of one single feature, there are still open questions about interim analyses of multiple features, particularly of high-dimensional microarray data, where the number of features clearly exceeds the number of samples. Therefore, we examine false discovery rates and power rates in microarray experiments performed during interim analyses of survival studies. In addition, the early stopping based on interim results of such studies is evaluated. As stop criterion we employ the achieved average power rate, i.e. the proportion of detected true positives, for which a new estimator is derived and compared to existing estimators. Results In a simulation study, pre-specified levels of the false discovery rate are maintained in each interim analysis, where reduced levels as used in classical group sequential designs of one single feature are not necessary. Average power rates increase with each interim analysis, and many studies can be stopped prior to their planned end when a certain pre-specified power rate is achieved. The new estimator for the power rate slightly deviates from the true power rate but is comparable to other estimators. Conclusions Interim analyses of microarray experiments can provide evidence for early stopping of

  18. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a response... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim...

  19. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Interim per capita payments. 417.808 Section 417.808 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH...

  20. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.808 Section 417.808 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH...

  1. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... rate; (2) A material variation from the costs estimated when the annual operating budget was prepared... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment... adjust the total amounts paid during the contract period to the level of incurred costs....

  2. System architecture for the Canadian interim mobile satellite system

    NASA Technical Reports Server (NTRS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-01-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  3. System architecture for the Canadian interim mobile satellite system

    NASA Astrophysics Data System (ADS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-05-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  4. Extended School Year in Michigan from 1969. An Interim Report.

    ERIC Educational Resources Information Center

    Roth, Rodney

    Based on two interim evaluations completed at the half-way point of the first full school year (1972-73) of implementation, this report reviews briefly the current status of two separate experimental extended school year projects in Michigan. The first plan, a 5-term design adopted by the tri-districts of East Lansing, Okemos, and Haslett, offers…

  5. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  6. Northeast Artificial Intelligence Consortium annual report. 1988 distributed planning for dynamic environments in the presence of time constraints. Volume 5. Interim report

    SciTech Connect

    Meyer, R.A.; Conry, S.; Cohen, P.R.; Lesser, V.R.

    1989-10-01

    Our primary goal has been one of developing a distributed firefighting simulator. This is necessary in order to provide an environment in which agents can cooperatively plan to contain fires. In order to accomplish this task, a number of issues related to timing, agent synchronization, management of thinking time and acting time, and agent capabilities must be resolved. The testbed simulator has not been designed simply as a distribution of the existing centralized firefighting simulator. The issues of time and agent synchronization in a multi-agent environment necessitated a complete redesign of the simulation. The new design permits multiple agents to work simultaneously and independently. It includes a facility for defining the characteristics of communications among agents, with available communication media independently specified. In addition, the new simulator will reflect much more realistic terrain representation and a significantly improved fire model than the existing centralized simulator.

  7. Work plan and sampling and analysis plan for interim remedial actions for Indian Mountain Long Range Radar Station, Elmendorf AFB, Alaska. Addendum to RI/FS work plan (July 1994) and sampling and analysis plan (July 1994). Final report, 1 May-13 July 1995

    SciTech Connect

    1995-07-13

    The purpose of the report is to describe and detail the activities to be conducted as part of the Interim Remedial Action at Indian Mountain Long Range Radar Station, Alaska. Section 1.0 provides introduction and background information, and states the objectives for the work. Section 2.0 describes the interim remedial action, including construction specifications. Section 3.0 details the description and construction of the containment cell. Additional characterization of Source Areas SS02, SS10, OT08, SS11 and SS09 is described in Section 4.0. Section 5.0 provides information regarding decontamination and waste management procedures. Sections 6.0, 7.0, and 8.0 provide information on project organization and schedule, reporting, and references, respectively.

  8. Interim dentures and treatment dentures.

    PubMed

    Smith, D E

    1984-04-01

    Improvement in the interim denture procedure in the past decade has been one of the significant advancements in prosthodontic practice. The interim denture approach is only slightly more time-consuming and expensive than the conventional immediate denture approach, yet it has many advantages. Among those advantages are the following: (1) allows rapid results; (2) results in a higher quality definitive denture; (3) allows the surgical treatment to be performed during one appointment; (4) permits duplication of the natural tooth position; and (5) provides the patient with a spare denture after the definitive denture is completed. An interim denture technique was described that utilized a flexible layered silicone mold to form the replaced teeth. The interim denture procedure is flexible and lends itself to many variations in technique to meet unusual clinical situations. An interim removable partial denture technique was described that involves block-out of undesirable undercuts and duplication of the master cast for fabrication of the partial denture. This technique results in an interim partial denture that can be placed with little or no adjustment and that will provide better service for those who require it. Three simple procedures for fabricating treatment dentures were described and the indications for each were discussed. Although treatment dentures are not often used, they are essential for the dentist who is treating difficult patients who require complete dentures.

  9. The Homestake Interim Laboratory and Homestake DUSEL

    NASA Astrophysics Data System (ADS)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  10. Interim final rules under the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008. Interim final rules with request for comments.

    PubMed

    2010-02-02

    This document contains interim final rules implementing the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, which requires parity between mental health or substance use disorder benefits and medical/surgical benefits with respect to financial requirements and treatment limitations under group health plans and health insurance coverage offered in connection with a group health plan.

  11. 19 CFR 354.8 - Interim sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the procedures of this section. (e) A person against whom interim sanctions are proposed has a right... appeal a decision on interim sanctions to the APO Sanctions Board, if such an appeal is certified by the...

  12. 19 CFR 354.8 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the procedures of this section. (e) A person against whom interim sanctions are proposed has a right... appeal a decision on interim sanctions to the APO Sanctions Board, if such an appeal is certified by the...

  13. 244-AR Vault Interim Stabilization Project Plan

    SciTech Connect

    LANEY, T.

    2000-03-24

    The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated.

  14. The combined evaluation of interim contrast-enhanced computerized tomography (CT) and FDG-PET/CT predicts the clinical outcomes and may impact on the therapeutic plans in patients with aggressive non-Hodgkin's lymphoma.

    PubMed

    Yang, Deok-Hwan; Min, Jung-Joon; Jeong, Yong Yeon; Ahn, Jae-Sook; Kim, Yeo-Kyeoung; Cho, Sang-Hee; Chung, Ik-Joo; Bom, Hee-Seung; Kim, Hyeoung-Joon; Lee, Je-Jung

    2009-05-01

    We investigated the concomitant interim response of patients with aggressive non-Hodgkin's lymphoma (NHL) using multi-detector row computerized tomography (CT) and (18)F-fluoro-2-deoxy-D: -glucose-positron emission tomography (PET)/CT for prediction of clinical outcomes. One hundred six newly diagnosed patients with aggressive NHL were enrolled. Both the CT and PET/CT were serially performed at the time of diagnosis and after three to four cycles of chemotherapy (interim). The patients were categorized into four different responsive groups according to the interim PET/CT and CT: (1) complete metabolic response (CMR)-complete response unconfirmed (CRu), (2) CMR-partial response (PR), (3) partial metabolic response (PMR)-Cru, and (4) PMR-PR. Fifty-five patients with CMR-CRu, 20 patients with CMR-PR, seven patients with PMR-Cru, and 23 patients with PMR-PR were distributed. In addition, one patient experienced a disease progression. There was a significant difference in relapse rates between PET/CT-positive (67.3%) and PET/CT-negative patients (17.3%; P < 0.01). Also, there was a significant difference between patients with PMR-PR (32.0% and 26.1%) and CMR-CRu (89.3% and 80.0%) for 3-year overall survival (OS) and event-free survival (EFS), respectively. A multivariate analysis revealed that high international prognostic index (> or =3) at diagnosis, T-cell phenotype, and PMR-PR in interim PET/CT and CT were independent prognostic significances for OS. Moreover, bulky disease (>10 cm), T-cell phenotype, and PMR-PR showed significant associations for EFS. PMR-PR in interim response was the predictive prognostic determinant for both OS and EFS, with a hazard ratio of 3.93 (1.61-9.60) and 3.60 (1.62-7.98), respectively. The combined evaluation of interim PET/CT and CT was found to be a significant predictor of disease progression, OS, and EFS.

  15. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  16. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  17. 12 CFR 268.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks... REGARDING EQUAL OPPORTUNITY Remedies and Enforcement § 268.505 Interim relief. (a)(1) When the Board appeals... offer of interim relief. (2) Service under the temporary or conditional restoration provisions of...

  18. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension of... world peace or the security or foreign policy of the United States. The interim suspension orders...

  19. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance...

  20. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use...

  1. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine...) The Judge will order interim action under paragraph (a) of this section, only after finding that...

  2. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  3. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b) Before...

  4. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b) Before...

  5. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b) Before...

  6. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b) Before...

  7. Realization of the German Concept for Interim Storage of Spent Nuclear Fuel - Current Situation and Prospects

    SciTech Connect

    Thomauske, B. R.

    2003-02-25

    The German government has determined a phase out of nuclear power. With respect to the management of spent fuel it was decided to terminate transports to reprocessing plants by 2005 and to set up interim storage facilities on power plant sites. This paper gives an overview of the German concept for spent fuel management focused on the new on-site interim storage concept and the applied interim storage facilities. Since the end of the year 1998, the utilities have applied for permission of on-site interim storage in 13 storage facilities and 5 storage areas; one application for the interim storage facility Stade was withdrawn due to the planned final shut down of Stade nuclear power plant in autumn 2003. In 2001 and 2002, 3 on-site storage areas and 2 on-site storage facilities for spent fuel were licensed by the Federal Office for Radiation Protection (BfS). A main task in 2002 and 2003 has been the examination of the safety and security of the planned interim storage facilities and the verification of the licensing prerequisites. In the aftermath of September 11, 2001, BfS has also examined the attack with a big passenger airplane. Up to now, these aircraft crash analyses have been performed for three on-site interim storage facilities; the fundamental results will be presented. It is the objective of BfS to conclude the licensing procedures for the applied on-site interim storage facilities in 2003. With an assumed construction period for the storage buildings of about two years, the on-site interim storage facilities could then be available in the year 2005.

  8. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... audit to issue the Document of Compliance certificate or demonstrated for the issuance of the Interim... company plans an internal audit of the vessel within three months; and (7) The relevant information from...'s personnel. ...

  9. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... audit to issue the Document of Compliance certificate or demonstrated for the issuance of the Interim... company plans an internal audit of the vessel within three months; and (7) The relevant information from...'s personnel. ...

  10. FRACTIONAL CRYSTALLIZATION LABORATORY TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    SciTech Connect

    HERTING DL

    2008-09-17

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste.

  11. Terrestrial gravity data analysis for interim gravity model improvement

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  12. Primer for the Interim Chair

    ERIC Educational Resources Information Center

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  13. Collection Analysis Project. Interim Report.

    ERIC Educational Resources Information Center

    Collier, Carol; And Others

    This interim report of the University of Wyoming's Collection Analysis Project, whose purpose is to examine the university library's collection development process and make workable recommendations for process improvement, consists of a brief history of the library's collection, including a review of the evolution of the collection development…

  14. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule.

  15. Primer for the Interim Chair

    ERIC Educational Resources Information Center

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  16. Collection Analysis Project. Interim Report.

    ERIC Educational Resources Information Center

    Collier, Carol; And Others

    This interim report of the University of Wyoming's Collection Analysis Project, whose purpose is to examine the university library's collection development process and make workable recommendations for process improvement, consists of a brief history of the library's collection, including a review of the evolution of the collection development…

  17. Interim Assessment Data: A Case Study on Modifying Instruction Based on Benchmark Feedback

    ERIC Educational Resources Information Center

    Lange, Tracey M.

    2014-01-01

    The role of data analysis in the jobs of instructional leaders has become as commonplace as teachers creating lesson plans and taking roll in the classroom. Teachers and building leaders routinely use interim assessment data to develop thoughtful and robust instructional plans that address identified areas of student need. The link between the…

  18. Interim Assessment Data: A Case Study on Modifying Instruction Based on Benchmark Feedback

    ERIC Educational Resources Information Center

    Lange, Tracey M.

    2014-01-01

    The role of data analysis in the jobs of instructional leaders has become as commonplace as teachers creating lesson plans and taking roll in the classroom. Teachers and building leaders routinely use interim assessment data to develop thoughtful and robust instructional plans that address identified areas of student need. The link between the…

  19. Interim rules for mental health parity--IRS, DoL, HCFA. Interim rules with request for comments.

    PubMed

    1997-12-22

    This document contains interim rules governing parity between medical/surgical benefits and mental health benefits in group health plans and health insurance coverage offered by issuers in connection with a group health plan. The rules contained in this document implement changes made to certain provisions of the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA or Act), and the Public Health Service Act (PHS Act) enacted as part of the Mental Health Parity Act of 1996 (MHPA) and the Taxpayer Relief Act of 1997. Interested persons are invited to submit comments on the interim rules for consideration by the Department of the Treasury, the Department of Labor, and the Department of Health and Human Services (Departments) in developing final rules. The rules contained in this document are being adopted on an interim basis to ensure that sponsors and administrators of group health plans, participants and beneficiaries, States, and issuers of group health insurance coverage have timely guidance concerning compliance with the requirements of MHPA.

  20. [When is enough evidence available?; interim analyses in clinical trials].

    PubMed

    van der Tweel, Ingeborg van; Roes, Kit C B

    2013-01-01

    There are ethical and economic reasons to design and conduct medical research as efficiently as possible. Clinical trials often take a long time because of the number of patients that must be included and the follow-up time in the study. Many data already become available during that time. By making interim analyses of these data it is possible to decide whether a final conclusion can be made. This may save time and may lead to a reduction in the number of patients. The statistical methodology of interim analyses is more complex than a fixed sample analysis and must be planned carefully in advance. The most important methods are sequential analysis and group sequential analysis. Both methods are aimed at a low risk of a false-positive conclusion. In this article we explain the application of these methods as well as considerations in the design of a study and interpretation of the results.

  1. AGR-1 Data Qualification Interim Report

    SciTech Connect

    Machael Abbott

    2009-08-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

  2. Alaska interim land cover mapping program

    USGS Publications Warehouse

    ,

    1987-01-01

    In order to meet the requirements of the Alaska National Interest Lands Conservation Act (ANILCA) for comprehensive resource and management plans from all major land management agencies in Alaska, the USGS has begun a program to classify land cover for the entire State using Landsat digital data. Vegetation and land cover classifications, generated in cooperation with other agencies, currently exist for 115 million acres of Alaska. Using these as a base, the USGS has prepared a comprehensive plan for classifying the remaining areas of the State. The development of this program will lead to a complete interim vegetation and land cover classification system for Alaska and allow the dissemination of digital data for those areas classified. At completion, 153 Alaska 1:250,000-scale quadrangles will be published and will include land cover from digital Landsat classifications, statistical summaries of all land cover by township, and computer-compatible tapes. An interagency working group has established an Alaska classification system (table 1) composed of 18 classes modified from "A land use and land cover classification system for use with remote sensor data" (Anderson and others, 1976), and from "Revision of a preliminary classification system for vegetation of Alaska" (Viereck and Dyrness, 1982) for the unique ecoregions which are found in Alaska.

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  4. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  5. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  6. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  11. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  12. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of... a consolidated procedural regulation applicable to title IX and other civil rights authorities administered by the Department, the procedural provisions applicable to title VI of the Civil Rights Act of...

  13. 39 CFR 952.6 - Interim impounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim impounding. 952.6 Section 952.6 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.6 Interim impounding. In preparation for or during the pendency of...

  14. Locating Interim Assessments within Teachers' Assessment Practice

    ERIC Educational Resources Information Center

    Riggan, Matthew; Olah, Leslie Nabors

    2011-01-01

    Promising research on the teaching and learning impact of classroom-embedded formative assessment has spawned interest in a broader array of assessment tools and practices, including interim assessment. Although researchers have begun to explore the impact of interim assessments in the classroom, like other assessment tools and practices, they…

  15. 20 CFR 410.234 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Interim provisions. 410.234 Section 410.234 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, TITLE IV... Evidence § 410.234 Interim provisions. (a) Notwithstanding any other provision of this subpart, a...

  16. Vet Centers. Interim final rule.

    PubMed

    2015-08-04

    The Department of Veterans Affairs (VA) is amending its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This interim final rule amends regulatory criteria to conform to the 2013 Act, to include new and revised definitions.

  17. Commentary: Interim leadership of academic departments at U.S. medical schools.

    PubMed

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  18. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  19. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  20. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of interim status. 270.73... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.73 Termination of interim status. Interim status terminates when: (a) Final administrative disposition of...

  1. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is... after the attachment of the insurance under the interim binder to which such valuation...

  2. 40 CFR 270.71 - Operation during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Operation during interim status. 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.71 Operation during interim status. (a) During the interim status period the facility shall not: (1)...

  3. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Interim final rule. 106.35 Section 106.35... PHMSA Rulemaking Documents § 106.35 Interim final rule. An interim final rule is issued without first... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause,...

  4. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public... example, an interim rule may be issued in instances when normal procedures for notice and comment prior...

  5. Medicare Interim Payment System's Impact on Medicare Home Health Utilization

    PubMed Central

    Liu, Korbin; Long, Sharon K.; Dowling, Krista

    2003-01-01

    The Medicare home health interim payment system (IPS) implemented in fiscal year 1998 provided very strong incentives for home health agencies (HHAs) to reduce the number of visits provided to each Medicare user and to avoid those beneficiaries whose Medicare plan of care was likely to exceed the average beneficiary cost limit. We analyzed multiple years of data from the Medicare Current Beneficiary Survey (MCBS) to examine how the IPS affected subgroups of the Medicare population by health and socioeconomic characteristics. We found that the IPS strongly reduced overall utilization, but that few subgroups were disproportionately affected. PMID:14997695

  6. Space shuttle SRM interim contract, part 1

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Essential studies and analyses required to integrate the SRM into the booster and overall space shuttle system. Emphasis was placed on the case, nozzle, insulation, and propellant components with resulting performance, weight, and structural load characteristics being generated. Effort conducted during the time period of this contract included studies, analyses, planning, and preliminary design activities. Technical requirements identified in the SRM Project Request for Proposal No. 8-1-4-94-98401 and Thiokol's proposed SRM design (designated Configuration 0) established the basis for this effort. The requirements were evaluated jointly with MSFC and altered where necessary to incorporate new information that evolved after issuance of the RFP and during the course of this interim contract. Revised water impact loads and load distributions were provided based on additional model test data and analytical effort conducted by NASA subsequent to the RFP release. Launch pad peaking loads into the SRM aft skirt were provided which also represented a change from RFP requirements. A modified SRM/External Tank (ET) attachment configuration with new structural load data was supplied by NASA, and direction was received to include a 2 percent inert weight contingency.

  7. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  8. 76 FR 31544 - Requirements for Fee Disclosure to Plan Fiduciaries and Participants-Applicability Dates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... benefit plans, Exemptions, Fiduciaries, Investments, Pensions, Prohibited transactions, Real estate... published in the Federal Register an interim final rule enhancing required disclosure from certain...

  9. DOE UST interim subsurface barrier technologies workshop

    SciTech Connect

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation.

  10. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  11. 40 CFR 180.319 - Interim tolerances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... TOLERANCES AND EXEMPTIONS FOR PESTICIDE CHEMICAL RESIDUES IN FOOD Specific Tolerances § 180.319 Interim... pesticide chemicals in or on the following raw agricultural commodities: Substances Uses Tolerance in...

  12. Interim Prosthesis Options for Dental Implants.

    PubMed

    Siadat, Hakimeh; Alikhasi, Marzieh; Beyabanaki, Elaheh

    2016-01-24

    Dental implants have become a popular treatment modality for replacing missing teeth. In this regard, the importance of restoring patients with function during the implant healing period has grown in recent decades. Esthetic concerns, especially in the anterior region of the maxilla, should also be considered until the definitive restoration is delivered. Another indication for such restorations is maintenance of the space required for esthetic and functional definitive restorations in cases where the implant site is surrounded by natural teeth. Numerous articles have described different types of interim prostheses and their fabrication techniques. This article aims to briefly discuss all types of implant-related interim prostheses by different classification including provisional timing (before implant placement, after implant placement in unloading and loading periods), materials, and techniques used for making the restorations, the type of interim prosthesis retention, and definitive restoration. Furthermore, the abutment torque for such restorations and methods for transferring the soft tissue from interim to definitive prostheses are addressed.

  13. [Comparison of Bayesian interim analysis and classical interim analysis in group sequential design].

    PubMed

    Yuan, Lingling; Zhan, Zhiying; Tan, Xuhui

    2015-11-01

    To explore the differences between the Bayesian interim analysis and the classical interim analysis. To compare the means of two independent samples between control and treatment, superior hypothesis test was established. In line with the data requirements for group sequential design, Type Iota error of Bayesian interim analysis based on various prior distributions, Power, Average Sample Size and Average Stage were estimated in the interim analysis. In the Pocock and O' Brien & Fleming designs, the Type Iota errors in the Bayesian interim analysis based on the skeptical prior distribution and the handicap prior distribution were controlled at around 0.05. When the powers of these two classical designs were both 80%, Bayesian powers of the skeptical prior distribution and the handicap prior distribution were markedly lower. The powers of the non-informative prior distribution and the enthusiastic prior distribution were distinctly higher than 80%. In the Bayesian interim analysis based on the skeptical prior distribution and the handicap Prior distribution, the Type Iota errors can be well controlled. Bayesian interim analyses using these two prior distributions, compared with the analysis adopting the O' Brien & Fleming method, can markedly increase the possibility of ending the clinical trials ahead of time. The Bayesian interim analyses based on these two distributions do not have practical value for group sequential design of the Pocock method.

  14. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  15. Once daily dolutegravir (S/GSK1349572) in combination therapy in antiretroviral-naive adults with HIV: planned interim 48 week results from SPRING-1, a dose-ranging, randomised, phase 2b trial.

    PubMed

    van Lunzen, Jan; Maggiolo, Franco; Arribas, José R; Rakhmanova, Aza; Yeni, Patrick; Young, Benjamin; Rockstroh, Jürgen K; Almond, Steve; Song, Ivy; Brothers, Cindy; Min, Sherene

    2012-02-01

    Dolutegravir (S/GSK1349572) is a new HIV-1 integrase inhibitor that has antiviral activity with once daily, unboosted dosing. SPRING-1 is an ongoing study designed to select a dose for phase 3 assessment. We present data from preplanned primary and interim analyses. In a phase 2b, multicentre, dose-ranging study, treatment-naive adults were randomly assigned (1:1:1:1) to receive 10 mg, 25 mg, or 50 mg dolutegravir or 600 mg efavirenz. Dose but not drug allocation was masked. Randomisation was by a central integrated voice-response system according to a computer-generated code. Study drugs were given with either tenofovir plus emtricitabine or abacavir plus lamivudine. Our study was done at 34 sites in France, Germany, Italy, Russia, Spain, and the USA beginning on July 9, 2009. Eligible participants were seropositive for HIV-1, aged 18 years or older, and had plasma HIV RNA viral loads of at least 1000 copies per mL and CD4 counts of at least 200 cells per μL. Our primary endpoint was the proportion of participants with viral load of less than 50 copies per mL at week 16 and we present data to week 48. Analyses were done on the basis of allocation group and included all participants who received at least one dose of study drug. This study is registered with ClinicalTrials.gov, number NCT00951015. 205 patients were randomly allocated and received at least one dose of study drug: 53, 51, and 51 to receive 10 mg, 25 mg, and 50 mg dolutegravir, respectively, and 50 to receive efavirenz. Week 16 response rates to viral loads of at most 50 copies per mL were 93% (144 of 155 participants) for all doses of dolutegravir (with little difference between dose groups) and 60% (30 of 50) for efavirenz; week 48 response rates were 87% (139 of 155) for all doses of dolutegravir and 82% (41 of 50) for efavirenz. Response rates between nucleoside reverse transcriptase inhibitor subgroups were similar. We identified three virological failures in the dolutegravir groups and one in

  16. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  17. Futility interim monitoring with control of type I and II error probabilities using the interim Z-value or confidence limit.

    PubMed

    Lachin, John M

    2009-12-01

    It is highly desirable to terminate a clinical trial early if the emerging data suggests that the experimental treatment is ineffective, or substantially less effective than the level the study was designed to detect. Many studies have used a conditional power calculation as the basis for termination for futility. However, in order to compute conditional power one must posit an assumption about the distribution of the future data yet to be observed, such as that the original design assumptions will apply, or that the future data will have the same treatment effect as that estimated from the current 'trend' in the data. Each such assumption will yield a different conditional power value. The assessment of futility is described in terms of the observed quantities alone, specifically the interim Z-value or the interim confidence limit on the magnitude of the treatment effect, such that specified type I and II error probabilities are achieved. No assumption is required regarding the distribution of the future data yet to be observed. Lachin [1] presents a review of futility stopping based on assessment of conditional power and evaluates the statistical properties of a futility stopping rule. These methods are adapted to futility stopping using only the observed data without any assumption about the future data yet to be observed. The statistical properties of the futility monitoring plan depend specifically on the corresponding boundary value for the interim Z-value. These include the probability of interim stopping under the null or under a specific alternative hypothesis, and the resulting type I and II error probabilities. Thus, the stopping rule can be uniquely specified in terms of a boundary for the interim Z-value. Alternately, the stopping rule can be specified in terms of a boundary on the upper confidence limit for the treatment group effect (favoring treatment). Herein it is shown that this approach is equivalent to a boundary on the test Z-value, from which

  18. CMM Interim Check Design of Experiments (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  19. Design review report FFTF interim storage cask

    SciTech Connect

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  20. Transuranic storage and assay facility interim safety basis

    SciTech Connect

    Porten, D.R., Fluor Daniel Hanford

    1997-02-12

    The Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis document provides the authorization basis for the interim operation and restriction on interim operations for the TRUSAF. The TRUSAF ISB demonstrates that the TRUSAF can be operated safely, protecting the workers, the public, and the environment. The previous safety analysis document TRUSAF Hazards Identification and Evaluation (WHC 1987) is superseded by this document.

  1. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... 7701(b)(2)(A)(i), determines that granting interim relief is not appropriate; (e) An interim personnel... administrative judge granting interim relief under 5 U.S.C. 7701(b)(2)(A) and a petition for review of the initial decision is filed (or will be filed) with the full Board under 5 U.S.C. 7701(e)(1)(A), the agency...

  2. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative within...

  3. 200 Area Interim Storage Area Technical Safety Requirements

    SciTech Connect

    CARRELL, R.D.

    2000-03-15

    The 200 Area Interim Storage Area Technical Safety Requirements define administrative controls and design features required to ensure safe operation during receipt and storage of canisters containing spent nuclear fuel. This document is based on the 200 Area Interim Storage Area, Annex D, Final Safety Analysis Report which contains information specific to the 200 Area Interim Storage Area.

  4. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings association...

  5. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office under...

  6. 41 CFR 101-29.204 - Interim Federal specification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal specification. 101-29.204 Section 101-29.204 Public Contracts and Property Management Federal Property... PRODUCT DESCRIPTIONS 29.2-Definitions § 101-29.204 Interim Federal specification. An interim Federal...

  7. 41 CFR 101-29.204 - Interim Federal specification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Interim Federal specification. 101-29.204 Section 101-29.204 Public Contracts and Property Management Federal Property... PRODUCT DESCRIPTIONS 29.2-Definitions § 101-29.204 Interim Federal specification. An interim Federal...

  8. 41 CFR 101-29.206 - Interim Federal standard.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Interim Federal standard. 101-29.206 Section 101-29.206 Public Contracts and Property Management Federal Property Management... DESCRIPTIONS 29.2-Definitions § 101-29.206 Interim Federal standard. An interim Federal standard is a potential...

  9. 41 CFR 101-29.206 - Interim Federal standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal standard. 101-29.206 Section 101-29.206 Public Contracts and Property Management Federal Property Management... DESCRIPTIONS 29.2-Definitions § 101-29.206 Interim Federal standard. An interim Federal standard is a potential...

  10. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  11. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may...

  12. 18 CFR 385.1113 - Interim relief (Rule 1113).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim relief (Rule... Under the NGPA § 385.1113 Interim relief (Rule 1113). (a) The petitioner may at any time file a request for interim relief in a proceeding under this subpart, setting forth the legal and factual basis for...

  13. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim certification procedures... Certification of Substantially Equivalent Agencies § 115.203 Interim certification procedures. (a) Upon receipt of a request for interim certification filed under § 115.202, the Assistant Secretary may...

  14. 10 CFR 205.288 - Interim and ancillary orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Interim and ancillary orders. 205.288 Section 205.288... Distribution of Refunds § 205.288 Interim and ancillary orders. The Director of the Office of Hearings and Appeals or his designee may issue any interim or ancillary orders, or make any rulings or...

  15. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information... commission may elect to establish an interim wholesale rate as described in paragraph (b) of this section....

  16. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  17. 5 CFR 1209.11 - Duration of stay; interim compliance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Duration of stay; interim compliance... WHISTLEBLOWING Stay Requests § 1209.11 Duration of stay; interim compliance. (a) Duration of stay. A stay becomes...) Interim compliance. An agency must immediately comply with an order granting a stay request. Although...

  18. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Qualifying for interim status. 270.70... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.70 Qualifying for interim status. (a) Any person who owns or operates an “existing HWM facility” or a...

  19. 40 CFR 66.23 - Interim recalculation of penalty.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Interim recalculation of penalty. 66... Penalties § 66.23 Interim recalculation of penalty. (a) The Administrator, upon concluding that a previously... respond in accordance with the provisions of § 66.51. The decision to accept the interim calculation or...

  20. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... of accessible OTRBs, the operator shall meet the following interim service requirements:...

  1. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Request for interim certification... Certification of Substantially Equivalent Agencies § 115.202 Request for interim certification. (a) A request for interim certification under this subpart shall be filed with the Assistant Secretary by the...

  2. 40 CFR 270.72 - Changes during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Changes during interim status. 270.72... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.72 Changes during interim status. (a) Except as provided in paragraph (b), the owner or operator of...

  3. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  4. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  5. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  6. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  7. Waste/By-Product Hydrogen

    DTIC Science & Technology

    2011-01-13

    Waste/By product Hydrogen Waste H2 sources include: � Waste bio‐mass: biogas to high temp fuel cells to produce H2 – there are over two dozen sites...By‐product Hydrogen Fuel Flexibility Biogas : generated from organic waste �Wastewater treatment plants can provide multiple MW of renewable...TCF ( 82 Million cars) � Biogas fuels approximately 210 Million cars Fuel Cell and Hydrogen Energy Association

  8. Interim endodontic therapy for alveolar socket bone regeneration of infected hopeless teeth prior to implant therapy.

    PubMed

    Rass, Marwan Abou

    2010-01-01

    The immediate placement of implants in the fresh extraction sockets of infected teeth with periradicular and periapical lesions is contraindicated because of both the infection and the loss of architecture required for proper implant placement. There are 4 approaches for implant replacement of a hopeless tooth with lesions: (1) extraction and delayed implant placement; (2) extraction, debridement, guided bone regeneration (GBR), guided tissue regeneration (GTR), and delayed implant placement; (3) extraction, intrasocket debridement, and immediate implant placement; or (4) extraction, debridement, GBR, GTR, and simultaneous implant placement. The extraction of such hopeless teeth often results in large bone and soft tissue defects that are difficult to repair. This article introduces an alternative approach: interim endodontic implant site preparation, defined as a transitional, surgical, or nonsurgical endodontic treatment to regenerate the hopeless tooth bone defects and prepare the site for proper implant placement. This article describes 3 distinct interim endodontic protocols used to manage 5 patients, all of whom had severely infected hopeless teeth with large lesions and were treatment planned for implant replacement: the first, interim nonsurgical endodontic treatment to restore the normal anatomy of the infected hopeless tooth; the second, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to regenerate apical bone for primary implant stability, thus avoiding the involvement of the maxillary sinus and other critical anatomic structures; and the third, interim surgical endodontics on the hopeless tooth with preexisting endodontic treatment to confine the size of the osseous defect and simplify the GBR and GTR procedures. The outcome of interim endodontic treatment on these 5 patients demonstrated that tooth extraction would have been a less predictable approach. The interim treatment changed the overall direction of the

  9. Interim Control Module Extraction Strut Assembly

    NASA Technical Reports Server (NTRS)

    Hansen, Chris

    1999-01-01

    The Interim Control Module is a propulsion and attitude control module for the International Space Station developed to serve as a replacement for the Russian Service Module in the event that Russia does not deliver the hardware as expected. The hardware was developed through a joint NASA/Naval Research Laboratory program and is based on a Department of Defense payload. This paper discusses the development and testing of the Extraction Strut hardware that will be used to assist in removing the Interim Control Module from the Shuttle's payload bay.

  10. Radiation therapy for nasopharyngeal carcinoma: the predictive value of interim survival assessment.

    PubMed

    Toya, Ryo; Murakami, Ryuji; Saito, Tetsuo; Murakami, Daizo; Matsuyama, Tomohiko; Baba, Yuji; Nishimura, Ryuichi; Hirai, Toshinori; Semba, Akiko; Yumoto, Eiji; Yamashita, Yasuyuki; Oya, Natsuo

    2016-09-01

    Pretreatment characteristics are suggested as predictive and/or prognostic factors for nasopharyngeal carcinoma (NPC); however, individual tumor radiosensitivities have previously not been considered. As boost planning is recommended for NPC, we performed interim assessments of magnetic resonance (MR) images for boost planning and retrospectively evaluated their predictive value for the survival of NPC patients. Radiation therapy via elective nodal irradiation (median dose: 39.6 Gy) with/without chemotherapy was used to treat 63 NPC patients. Boost irradiation (median total dose: 70 Gy) was performed based on the interim assessment. The largest lymph node (LN) was measured on MR images acquired at the time of interim assessment. The site of first failure was local in 8 (12.7%), regional in 7 (11.1%), and distant in 12 patients (19.0%). All 7 patients with regional failure harbored LNs ≥15 mm at interim assessment. We divided the 63 patients into two groups based on LN size [large (≥15 mm), n = 10 and small (<15 mm), n = 53]. Univariate analysis showed that 5-year overall survival (OS) and cause-specific survival (CSS) rates for large LNs were significantly lower than for small LNs (OS: 12.5% vs 70.5%, P < 0.001 and CSS: 25.0% vs 80.0%, P < 0.001). Multivariate analysis showed that large LNs were a significantly unfavorable factor for both OS (hazard ratio = 4.543, P = 0.002) and CSS (hazard ratio = 6.020, P = 0.001). The results suggest that LN size at interim assessment could predict survival in NPC patients.

  11. Interim definitions for old growth Douglas-fir and mixed-conifer forests in the Pacific Northwest and California.

    Treesearch

    J.F. Franklin; F. Hall; W. Laudenslayer; C. Maser; J. Nunan; J. Poppino; C.J. Ralph; T. Spies

    1986-01-01

    Interim definitions of old-growth forests are provided to guide efforts in land-management planning until comprehensive definitions based on research that is currently underway can be formulated. The basic criteria for identifying old-growth Douglas-fir (Pseudotsuga menziesii (Mirb.) Franco) and mixed-conifer forests in western Washington and...

  12. 75 FR 5409 - Interim Final Rules Under the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ...This document contains interim final rules implementing the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, which requires parity between mental health or substance use disorder benefits and medical/surgical benefits with respect to financial requirements and treatment limitations under group health plans and health insurance coverage offered in......

  13. 76 FR 8383 - Office of New Reactors; Interim Staff Guidance on Impacts of Construction of New Nuclear Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... COMMISSION Office of New Reactors; Interim Staff Guidance on Impacts of Construction of New Nuclear Power..., ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (SRP),'' Chapter 1..., Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone at 301...

  14. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    SciTech Connect

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit.

  15. Leveraging Information Technology to Enable Army Transformation: Capabilities and Challenges for the Interim Force

    DTIC Science & Technology

    2007-11-02

    is to examine the Interim Force and determine whether or not the higher technical performance expected to be gained from information technology will...which this force is being developed, underscore the capabilities information technology brings to the transformation effort, and examine the...challenges information technology presents Army planners and leaders as they further develop the campaign plan and execute the program. This study will

  16. Should Sponsors and DSMBs Share Interim Results Across Trials?

    PubMed Central

    Shah, Seema K.; Dawson, Liza; Dixon, Dennis O.; Lie, Reidar K.

    2011-01-01

    Increasing numbers of multinational clinical trials have generated new ethical obligations of research sponsors and their DSMBs. Although sponsors and DSMBs clearly have ethical obligations to protect subjects in their trials, future patients, and the integrity of their trial, the obligations they have to protect subjects in other trials have been overlooked. When interim results from clinical trials can significantly affect the conduct of other trials and the welfare of the subjects in those trials, sponsors and DSMBs may have obligations to disclose results to the relevant parties. We propose that sponsors and DSMBs routinely work together in advance to develop a plan for disclosing relevant information in cases where it is necessary to protect the welfare of subjects in other trials. Channels of communication between sponsors, DSMBs, IRBs, and others involved in similar and concurrent trials will better protect both research participants and the integrity of the research enterprise. PMID:21937922

  17. Interim Report - Grant AFOSR-85-0065.

    DTIC Science & Technology

    1985-06-30

    Option 065 Drafting Plotter 1 7475A 6 Pen Graphics Plotter Vendor: Imagen Corporation $ 11,266 1 Model 8/300 Laser Printer System, 512Kbytes memory 1... Imagen 8/300 Laser Printer 3 Interim Report Grant No. AFOSR-85-0065 was equivalent to the Versatec plotter for small plots and better for text output

  18. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Interim provisions. 94.12 Section 94.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... engines subject to 40 CFR part 1042. Similarly, beginning model year 2014, engines with maximum engine...

  19. 340 waste handling facility interim safety basis

    SciTech Connect

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  20. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  1. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  2. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  3. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  4. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  5. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a...

  6. Interim Guidelines Growing Longleaf Seedlings in Containers

    Treesearch

    James P. Barnett; Mark J. Hainds; George A. Hernandez

    2002-01-01

    These interim guidelines are designed for producers and users of longleaf pine container stock. They are not meant to exclude any container product. The seedling specifications listed in the preferred category are attainable by the grower and will result in excellent field sur vival and early height growth.

  7. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification activities...

  8. Automotive Mechanics Occupational Performance Survey. Interim Report.

    ERIC Educational Resources Information Center

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  9. Adult Career Advocates Training Project. Interim Report.

    ERIC Educational Resources Information Center

    Jacobson, Marilyn D.

    The first year's activities of the Adult Career Advocates Project are described in this interim report, a national study of what counseling services are available for out-of-school youth and adults. Focus is on administrative structure, programming, staffing, and funding of the 353 centers identified as providing career and educational guidance to…

  10. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  11. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of...

  12. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of...

  13. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of...

  14. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  15. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM SUBSIDIZED...

  16. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification activities...

  17. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  18. 340 Waste handling facility interim safety basis

    SciTech Connect

    Stordeur, R.T.

    1996-10-04

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  19. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  20. The Interim Superintendent: A Case Study

    ERIC Educational Resources Information Center

    Bigham, Gary; Nix, Susan J.

    2011-01-01

    Considering the vitally important role that the superintendent plays in the overall functioning and wellbeing of any school district, the filling of that position should never be done in haste. Due to the importance of this process and the time it requires, school districts often employ an interim superintendent. In this single case study, one…

  1. 29 CFR 1614.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL EMPLOYMENT OPPORTUNITY Remedies and Enforcement § 1614.505 Interim relief. (a)(1) When the agency appeals and the case... the complainant, decline to return the complainant to his or her place of employment if it determines...

  2. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure...

  3. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure...

  4. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure...

  5. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a Disclosure...

  6. Our Greatest Natural Resource: Investing in the Future of Alaska's Children. A Report of the Governor's Interim Commission on Children and Youth.

    ERIC Educational Resources Information Center

    Alaska Office of the Governor, Juneau.

    In 1987, the Governor of Alaska's Interim Commission on Children and Youth was given two tasks: (1) to develop a plan for a first-class child care system for working parents statewide that is workable, fair and sensibly integrates with the public schools; and (2) to produce a comprehensive plan to combat the problems facing Alaskans so they are…

  7. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN Ensuring Protection of the Natural System and Water... for developing interim targets. (1) RECOVER, using best available science and information, shall...

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    SciTech Connect

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).

  9. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    SciTech Connect

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  10. Software Configuration Management Plan for the Sodium Removal System

    SciTech Connect

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  11. Biocides for the Battlefield - Interim Report

    DTIC Science & Technology

    2010-09-24

    for public release; distribution is unlimited. James H . Wynne Materials Chemistry Branch Chemistry Division Preston a. Fulmer Chemical Dynamics and...b. ABSTRACT c. THIS PAGE 18. NUMBER OF PAGES 17. LIMITATION OF ABSTRACT Biocides for the Battlefield—Interim Report James H . Wynne and Preston A...distribution is unlimited. Unclassified Unclassified Unclassified SAR 25 James H . Wynne (202) 404-4010 The ability to disinfect surfaces and manufacture self

  12. Recommended alternative for interim stabilization of Tank 241-C-103

    SciTech Connect

    Dukelow, G.T.; Turner, D.A.; Grigsby, J.M.

    1995-04-01

    The waste in tank 241-C-103 poses several health and safety risks and potential soil contamination caused by tank leaks. To minimize the risk of contaminating the soil beneath the tank, the pumpable waste liquids are planned to be removed by salt well pumping. In addition to aqueous liquids, this tank is unique because it also contains a layer of degraded PUREX solvent floating on the aqueous liquid. The following three options for removing and storing this separable phase organic solvent have been proposed and studied: transferring the organic solvent and pumpable aqueous liquids using existing salt well pumping equipment and procedures to a double-shell tank (DST) for storage; removing most of the organic solvent using a skimmer pump, then salt well pumping the remaining pumpable liquids to a different DST for storage; removing most of the organic solvent to an aboveground storage tank for eventual treatment or offsite transfer, and then salt well pumping the remaining pumpable liquids to a DST for interim storage. As a result of evaluating these three options and a no pumping option, the recommended action is to transfer both the organic solvent and pumpable aqueous liquid to a DST for storage using existing salt well pumping equipment. The evaluation considers the following criteria: public health and safety, worker safety, environmental compliance, engineering feasibility, and cost. The options compared these factors. Two key areas drove the selection of the recommended approach: the minimization of potential soil contamination from tank leaks caused the (interim stabilization by salt well pumping) options to be rated more highly than the no pumping option; and cost and implementation factors caused the transfer and storage to DST using existing tank farm salt well pumping equipment option to rate higher than the skimming options. Other factors have only a second order effect on the selection process. Evaluation results are described in this report.

  13. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    SciTech Connect

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  14. An Aging Interventions Testing Program: study design and interim report.

    PubMed

    Miller, Richard A; Harrison, David E; Astle, Clinton M; Floyd, Robert A; Flurkey, Kevin; Hensley, Kenneth L; Javors, Martin A; Leeuwenburgh, Christiaan; Nelson, James F; Ongini, Ennio; Nadon, Nancy L; Warner, Huber R; Strong, Randy

    2007-08-01

    The National Institute on Aging's Interventions Testing Program (ITP) has developed a plan to evaluate agents that are considered plausible candidates for delaying rates of aging. Key features include: (i) use of genetically heterogeneous mice (a standardized four-way cross), (ii) replication at three test sites (the Jackson Laboratory, TJL; University of Michigan, UM; and University of Texas, UT), (iii) sufficient statistical power to detect 10% changes in lifespan, (iv) tests for age-dependent changes in T cell subsets and physical activity, and (v) an annual solicitation for collaborators who wish to suggest new interventions for evaluation. Mice in the first cohort were exposed to one of four agents: aspirin, nitroflurbiprofen (NFP), 4-OH-alpha-phenyl-N-tert-butyl nitrone (4-OH-PBN), or nordihydroguiaretic acid (NDGA). An interim analysis was conducted using survival data available on the date at which at least 50% of the male control mice had died at each test site. Survival of control males was significantly higher, at the interim time-point, at UM than at UT or TJL; all three sites had similar survival of control females. Males in the NDGA group had significantly improved survival (P = 0.0004), with significant effects noted at TJL (P < 0.01) and UT (P < 0.04). None of the other agents altered survival, although there was a suggestion (P = 0.07) of a beneficial effect of aspirin in males. More data will be needed to determine if any of these compounds can extend maximal lifespan, but the current data show that NDGA reduces early life mortality risks in genetically heterogeneous mice at multiple test sites.

  15. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Federal Highway Administration Congestion Mitigation and Air Quality Improvement Program Interim Guidance... Mitigation and Air Quality Improvement (CMAQ) Program (Interim Guidance). The Interim Guidance revises CMAQ....gov/environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This...

  16. Compilation of interim technical research memoranda. Volume I

    SciTech Connect

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields.

  17. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  18. Progress of a policy experiment: Climate challenge interim report card

    SciTech Connect

    Sturges, S.; Hewitt, J.B.

    1995-01-01

    The Climate Challenge is the electric utility industry`s first chance to prove it can collaborate with government to address the possibility of climate change rather than waiting for legislative fiat on an environmental issue. Initial reports suggest that utilities are taking it seriously and the program will generate significant results. The Clinton administration is faced with the challenge of meeting international environmental committments in an era of budget tightening and scientific uncertainty. To do so, it based its Climate Change Action Plan (CCAP) primarily on breaking `new ground in the relationship between government and the private sector - fostoring cooperative approaches and a forward-looking agenda, rather than relying exclusively on command-and-control mandates that tend to lock technologies into place and stifel innovation.` The CCAP contains initiatives in several sectors, including electric utilities, industry, commercial and residential buildings, and agriculture. This artice is an interim report card on one of the major components of the CCAP, the Climate Challenge. Climate Challenge is a joint Department of Energy/electric utility program. In telephone surveys conducted by the authors, utilities considering participating in the program discussed their opinions of its potential success and the challenges they face in developing their participation plans. While the potential for success in generating significant greenhouse gas (GHG) emission reductions is cited by a majority of participants, the prediction is not uniformly rosy. Participants cite serious challenges to achieving GHG emission reductions, including factors that seem beyond their control, such as demand growth, deregulation, and competition.

  19. Coverage of certain preventive services under the Affordable Care Act. Interim final rules.

    PubMed

    2014-08-27

    This document contains interim final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. Among these services are women's preventive health services, as specified in guidelines supported by the Health Resources and Services Administration (HRSA). As authorized by the current regulations, and consistent with the HRSA Guidelines, group health plans established or maintained by certain religious employers (and group health insurance coverage provided in connection with such plans) are exempt from the otherwise applicable requirement to cover certain contraceptive services. Additionally, under current regulations, accommodations are available with respect to the contraceptive coverage requirement for group health plans established or maintained by eligible organizations (and group health insurance coverage provided in connection with such plans), and student health insurance coverage arranged by eligible organizations that are institutions of higher education, that effectively exempt them from this requirement. The regulations establish a mechanism for separately furnishing payments for contraceptive services on behalf of participants and beneficiaries of the group health plans of eligible organizations that avail themselves of an accommodation, and enrollees and dependents of student health coverage arranged by eligible organizations that are institutions of higher education that avail themselves of an accommodation. These interim final regulations augment current regulations in light of the Supreme Court's interim order in connection with an

  20. Interim Performance Objectives: Office of Student Financial Assistance.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This booklet lists the interim performance objectives of the Office of Student Financial Assistance (Department of Education) as required by the Higher Education Act Amendments of 1998. These interim objectives are intended to guide the office until the end of the September 1999 fiscal year. The first objective is to improve customer satisfaction.…

  1. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  2. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  3. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  4. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  5. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  6. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  7. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  8. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  9. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  10. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  11. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  12. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew; Cooper, Robyn; Ebbers, Larry

    2012-01-01

    The purpose of this case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this study: 1. How do two interim community college presidents lead community colleges during a…

  13. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... COMMISSION Interim Staff Guidance on Changes During Construction AGENCY: Nuclear Regulatory Commission... Guidance (ISG) COL-ISG-025 ``Interim Staff Guidance on Changes During Construction.'' This ISG provides... during Construction under 10 CFR Part 52'' is available electronically under ADAMS Accession Number...

  14. Statistical Profile of Children and Mothers in Afghanistan. Interim Edition.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This interim report is an updating of the 1977 Statistical Profile of Children and Mothers in Afghanistan. The interim report reflects the significant changes in policies brought about by the Saur Revolution establishing the Democratic Republic of Afghanistan in 1978. A comprehensive revision of the report is expected when the new government's…

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... Report and Order in MM Docket No. 99-325, as revised in the Media Bureau's subsequent Order in MM...

  16. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  17. 7 CFR 900.70 - Applications for interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Applications for interim relief. 900.70 Section 900.70... Applications for interim relief. (a) Filing the application. A person who has filed a petition pursuant to... the relief is requested, including any facts showing irreparable injury. The application must be...

  18. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  19. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  20. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  1. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  2. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  3. Statistical Profile of Children and Mothers in Afghanistan. Interim Edition.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This interim report is an updating of the 1977 Statistical Profile of Children and Mothers in Afghanistan. The interim report reflects the significant changes in policies brought about by the Saur Revolution establishing the Democratic Republic of Afghanistan in 1978. A comprehensive revision of the report is expected when the new government's…

  4. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder....

  5. 45 CFR 1606.13 - Interim and termination funding; reprogramming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim and termination funding; reprogramming. 1606.13 Section 1606.13 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION TERMINATION AND DEBARMENT PROCEDURES; RECOMPETITION § 1606.13 Interim and...

  6. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  7. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amounts insured under interim binder. 308.303 Section 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The...

  8. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  9. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Interim disaster procedures. 280.1 Section 280.1 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF....1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  10. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a... shall provide transport and termination of telecommunications traffic immediately under an...

  11. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew; Cooper, Robyn; Ebbers, Larry

    2012-01-01

    The purpose of this case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this study: 1. How do two interim community college presidents lead community colleges during a…

  12. The Predictive and Instructional Value of Interim Assessments

    ERIC Educational Resources Information Center

    Pon, Kathleen

    2013-01-01

    This mixed design study investigated the predictive and instructional uses of two different types of interim mathematics assessments given in two different districts. One district administered the same summative type of assessment three times a year, while the other district administered a different interim assessment after six-week intervals of…

  13. 40 CFR 270.64 - Interim permits for UIC wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Interim permits for UIC wells. 270.64 Section 270.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.64 Interim permits for UIC wells. The Director may issue a permit under this part to any Class...

  14. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Periodic interim payments. 418.307 Section 418.307... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic...

  15. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an...

  16. 39 CFR 211.4 - Interim personnel regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION APPLICATION OF REGULATIONS § 211.4 Interim personnel regulations. (a) Continuation of Personnel Regulations of the Post...

  17. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    SciTech Connect

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document.

  18. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CONSERVATION ACT OF 1975 Article 8 Financial Statements of Smaller Reporting Companies § 210.8-03 Interim... as of the end of the issuer's most recent fiscal quarter, a balance sheet as of the end of the.... If a significant disposition or business combination has occurred during the most recent interim...

  19. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  20. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  1. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic interim... PIP method unless the hospice requests a longer fixed interval (not to exceed one month)...

  2. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... filed with the interim financial statements. Interim financial statements shall include a balance sheet as of the end of the issuer's most recent fiscal quarter, a balance sheet as of the end of the... date of such balance sheet and the comparable period of the preceding fiscal year. (a) Condensed...

  3. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  4. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  5. Recent advances in Hodgkin lymphoma: interim PET and molecular-targeted therapy.

    PubMed

    Nagai, Hirokazu

    2015-02-01

    Hodgkin lymphoma is a highly curative lymphoid malignancy, but some patients relapse or experience adverse events from treatment. Therefore, prognostic markers are needed to allow a more patient-tailored approach to treatment. The positive-predictive value of interim positron emission tomography for progression-free survival was reported as 81%, and the negative-predictive value was reported as 97%. Interim positron emission tomography might identify high-risk patients who would benefit from more intensive treatment regimens as well as identify low-risk patients in whom even the standard treatment regimen might be a form of overtreatment. Indeed, major clinical study groups have conducted risk-adapted treatment protocols based on interim positron emission tomography. The Japan Clinical Oncology Group is also planning a Phase II trial of this concept for advanced Hodgkin lymphoma. These trials are now ongoing, but the data of them are expected soon. Molecular-targeted therapy is another important approach to improve outcomes for these patients. Brentuximab vedotin is an antibody-drug conjugate that targets CD30 on Hodgkin cells and has excellent efficacy when used as monotherapy. The combination of brentuximab vedotin and standard chemotherapies are being investigated in randomized Phase III trials. These approaches might lead to a paradigm shift in the treatment of Hodgkin lymphoma.

  6. Monitoring Plan for RCRA Groundwater Assessment at the 216-U-12 Crib

    SciTech Connect

    Williams, Bruce A.; Chou, Charissa J.

    2005-09-20

    This document contains a revised and updated monitoring plan for RCRA interim status groundwater assessment, site hydrogeology, and a conceptual model of the RCRA treatment, storage, and disposal unit. Monitoring under interim status is expected to continue until the 216-U-12 crib is incorporated as a chapter into the Hanford Facility RCRA Permit or administratively closed as proposed to EPA and Ecology.

  7. Increasing the sample size at interim for a two-sample experiment without Type I error inflation.

    PubMed

    Dunnigan, Keith; King, Dennis W

    2010-01-01

    For the case of a one-sample experiment with known variance σ² =1, it has been shown that at interim analysis the sample size (SS) may be increased by any arbitrary amount provided: (1) The conditional power (CP) at interim is ≥ 50% and (2) there can be no decision to decrease the SS (stop the trial early). In this paper we verify this result for the case of a two-sample experiment with proportional SS in the treatment groups and an arbitrary common variance. Numerous authors have presented the formula for the CP at interim for a two-sample test with equal SS in the treatment groups and an arbitrary common variance, for both the one- and two-sided hypothesis tests. In this paper we derive the corresponding formula for the case of unequal, but proportional SS in the treatment groups for both one-sided superiority and two-sided hypothesis tests. Finally, we present an SAS macro for doing this calculation and provide a worked out hypothetical example. In discussion we note that this type of trial design trades the ability to stop early (for lack of efficacy) for the elimination of the Type I error penalty. The loss of early stopping requires that such a design employs a data monitoring committee, blinding of the sponsor to the interim calculations, and pre-planning of how much and under what conditions to increase the SS and that this all be formally written into an interim analysis plan before the start of the study.

  8. 50 CFR 259.30 - Application for Interim Capital Construction Fund Agreement (“Interim CCF Agreement”).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Application for Interim Capital Construction Fund Agreement (âInterim CCF Agreementâ). 259.30 Section 259.30 Wildlife and Fisheries NATIONAL... FISHERIES CAPITAL CONSTRUCTION FUND Capital Construction Fund Agreement § 259.30 Application for...

  9. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2001-03-23

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  10. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    SciTech Connect

    Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus; Johnson, Christian D.; Tartakovsky, Guzel D.; Johnson, Timothy C.; Clayton, Ray E.; Chronister, Glen B.

    2015-09-01

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  11. 41 CFR 101-29.501 - Optional use of interim Federal specifications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-FEDERAL PRODUCT DESCRIPTIONS 29.5-Use of and Optional Use of Federal Product Descriptions and Agency Product Descriptions § 101-29.501 Optional use of interim Federal specifications. Interim Federal... promulgation as Federal specifications or commercial item descriptions. Interim revisions or interim amendments...

  12. ANALYSIS OF DOSE RATES DURING REPLACEMENT OF MANIPULATORS IN THE FFTF INTERIM EXAMINATION & MAINTENANCE (IEM) CELL

    SciTech Connect

    NELSON, J.V.

    2002-01-23

    Replacement of a master-slave manipulator in the Interim Examination and Maintenance Cell at the Fast Flux Test Facility was carried out in August 2001. This operation created a 178-mm opening in the thick concrete wall of the hot cell. To aid in radiological work planning, dose rates outside the penetration in the wall were predicted using MCNP{trademark} photon transport calculations. The predicted dose rate was 7.7 mrem/h, which was reasonably close to the value of 10.4 mrem/h inferred from measurements.

  13. Eos Interviews Robert Van Hook, Former AGU Interim Executive Director

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-08-01

    Robert Van Hook, who served as AGU's interim executive director since January 2009, led the organization during a transition period that began with the retirement of long-serving executive director A. F. (“Fred”) Spilhaus Jr. Van Hook's tenure concluded on 30 August when Christine McEntee assumed her position as AGU's new executive director (see Eos, 91(17), 153, 156, 2010). During his tenure at AGU, which overlapped with a global economic recession, Van Hook helped to guide the organization through key structural governance changes, strategic planning, and upgrades in technology, human resources, and accounting. He also helped to revitalize public outreach and member services, among many other efforts. Van Hook, president of Transition Management Consulting, recently reflected upon his tenure, the transition period, and the future of AGU. Van Hook credits AGU's strong volunteer leadership—including past presidents Tim Killeen and Tim Grove, current president Mike McPhaden, and president-elect Carol Finn—for courage in moving the organization through a successful transition. “They were the ones who shoved the boat off from the shore. I was lucky enough to be invited into the boat,” he said. He also credits the staff for their resiliency and commitment to supporting AGU's science.

  14. Peer Review of the Waste Package Material Performance Interim Report

    SciTech Connect

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-09-04

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis.

  15. Safe Advantage on Dry Interim Spent Nuclear Fuel Storage

    SciTech Connect

    Romanato, L.S.

    2008-07-01

    This paper aims to present the advantages of dry cask storage in comparison with the wet storage (cooling water pools) for SNF. When the nuclear fuel is removed from the core reactor, it is moved to a storage unit and it wait for a final destination. Generally, the spent nuclear fuel (SNF) remains inside water pools within the reactors facility for the radioactive activity decay. After some period of time in pools, SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing facilities, or still, wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet facilities, depending on the method adopted by the nuclear power plant or other plans of the country. Interim storage, up to 20 years ago, was exclusively wet and if the nuclear facility had to be decommissioned another storage solution had to be found. At the present time, after a preliminary cooling of the SNF elements inside the water pool, the elements can be stored in dry facilities. This kind of storage does not need complex radiation monitoring and it is safer then wet one. Casks, either concrete or metallic, are safer, especially on occurrence of earthquakes, like that occurred at Kashiwazaki-Kariwa nuclear power plant, in Japan on July 16, 2007. (authors)

  16. Interim treatment: Bridging delays to opioid treatment access

    PubMed Central

    Sigmon, Stacey C.

    2015-01-01

    Objective Despite the undisputed effectiveness of agonist maintenance for opioid dependence, individuals can remain on waitlists for months, during which they are at significant risk for morbidity and mortality. To mitigate these risks, the Food and Drug Administration in 1993 approved interim treatment, involving daily medication + emergency counseling only, when only a waitlist is otherwise available. We review the published research in the 20 years since the approval of interim opioid treatment. Methods A literature search was conducted to identify all randomized trials evaluating the efficacy of interim treatment for opioid-dependent patients awaiting comprehensive treatment. Results Interim opioid treatment has been evaluated in four controlled trials to date. In three, interim treatment was compared to waitlist or placebo control conditions and produced greater outcomes on measures of illicit opioid use, retention, criminality and likelihood of entry into comprehensive treatment. In the fourth, interim treatment was compared to standard methadone maintenance and produced comparable outcomes in illicit opioid use, retention and criminal activity. Conclusions Interim treatment significantly reduces patient and societal risks when conventional treatment is unavailable. Further research is needed to examine the generality of these findings, further enhance outcomes, and identify the patient characteristics which predict treatment response. PMID:25937593

  17. By-product and discarded material utilization in highway construction and maintenance: A literature review. Interim research report (Final)

    SciTech Connect

    Hunsucker, D.Q.; Tilley, J.

    1994-06-01

    The report summarizes the findings of an extensive literature search and review conducted to determine current attitudes relative to the use of recyclable and recoverable materials in highway construction and maintenance activities. Specifically, the literature search focused upon the engineering, economic, and performance aspects of using recyclable and recoverable materials in highway construction and maintenance projects. The literature review focused on asphalt and cement concrete pavement recycling, discarded tire recycling, reuse of paint removal wastes, fly ash, glass, alternative fuels, and other miscellaneous recycled and recovered materials as related to construction and maintenance of highways. Additionally, regulatory and policy matters associated with the use of recyclable and recoverable materials in the transportation area were investigated during the review of literature.

  18. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    NASA Astrophysics Data System (ADS)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  19. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd.

  20. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    SciTech Connect

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  1. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  2. 3RS action plan

    SciTech Connect

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  3. Natural tooth as an interim prosthesis

    PubMed Central

    Dhariwal, Neha S.; Gokhale, Niraj S.; Patel, Punit; Hugar, Shivayogi M.

    2016-01-01

    A traumatic injury to primary maxillary anterior tooth is one of the common causes for problems with the succedaneous tooth leading to it noneruption. A missing anterior tooth can be psychologically and socially damaging to the patient. Despite a wide range of treatment options available, sometimes, it is inevitable to save the natural tooth. This paper describes the immediate replacement of a right central incisor using a fiber-composite resin splint with the natural tooth crown as a pontic following surgical extraction of the dilacerated impacted permanent maxillary central incisor. The abutment teeth can be conserved with minimal or no preparation, thus keeping the technique reversible and can be completed at chair side thereby avoiding laboratory costs. It can be used as an interim measure until a definitive prosthesis can be fabricated as the growth is still incomplete. PMID:27433074

  4. Interim prediction method for jet noise

    NASA Technical Reports Server (NTRS)

    Stone, J. R.

    1974-01-01

    A method is provided for predicting jet noise for a wide range of nozzle geometries and operating conditions of interest for aircraft engines. Jet noise theory, data and existing prediction methods was reviewed, and based on this information a interim method of jet noise prediction is proposed. Problem areas are idenified where further research is needed to improve the prediction method. This method predicts only the noise generated by the exhaust jets mixing with the surrounding air and does not include other noises emanating from the engine exhaust, such as combustion and machinery noise generated inside the engine (i.e., core noise). It does, however, include thrust reverser noise. Prediction relations are provided for conical nozzles, plug nozzles, coaxial nozzles and slot nozzles.

  5. Interim Guidance: Municipal Solid Waste Exemption under Superfund

    EPA Pesticide Factsheets

    Interim guidance discusses the statutory provisions of CERCLA § 107(p) and identifies some factors to be considered by EPA and DOJ staff in exercising their enforcement discretion of MSW at an NPL site.

  6. 14 CFR 91.871 - Waivers from interim compliance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... period will be at least 14 days. ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Waivers from interim compliance... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES...

  7. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  8. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  9. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  10. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  11. TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY

    SciTech Connect

    HOLM MJ

    2009-06-25

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  12. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  13. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  14. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  15. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  16. Fire Hazards Analysis for the 200 Area Interim Storage Area

    SciTech Connect

    JOHNSON, D.M.

    2000-01-06

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards.

  17. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  18. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with...

  19. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    EPA Pesticide Factsheets

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  20. 16 CFR § 1203.53 - Interim safety standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., 1995, Through March 10, 1999 § 1203.53 Interim safety standards. (a) Bicycle helmets must comply with... Protective Headgear for Use in Non-Motorized Sports (designation N-94), or (7) Snell 1995 standard for...

  1. 40 CFR 790.62 - Submission of study plans and conduct of testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... short-term test and of each major phases of long-term tests, and submission of interim progress and/or... of any proposed changes in standards for the development of data, study plans or testing schedules...

  2. Interim Safety Basis for Fuel Supply Shutdown Facility

    SciTech Connect

    BENECKE, M.W.

    2000-09-07

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.

  3. Interim Enhanced Surface Water Treatment Rule Documents

    EPA Pesticide Factsheets

    The IESWTR balances the need for treatment with potential increases in disinfection by -products. The materials found on this page are intended to assist public water systems and state in the implementation of the IESWTR.

  4. IUS capability for earth orbital spacecraft. [Interim Upper Stage program for shuttle transportation

    NASA Technical Reports Server (NTRS)

    Huber, W. G.; Huffaker, C. F.

    1976-01-01

    A basic element of the Space Transportation System (STS) is the Interim Upper Stage (IUS) currently being planned by the USAF. The prime use of the basic two-stage IUS vehicle by both NASA and DoD will be to place satellites in geosynchronous orbit. High energy missions such as planetary will be accomplished by three- and four-stage vehicles. Various other configurations such as tandem vehicles in a single Shuttle and multiple spacecraft are being planned. Also under study is a smaller stage that can be flown with other payloads on a space available basis. The various concepts being studied offer economical transportation alternatives to potential users. This paper describes details of the IUS program status, design requirements, concepts and applications to Earth orbital spacecraft.

  5. E-Area Performance Assessment Interim Measures Assessment FY2005

    SciTech Connect

    Stallings, M

    2006-01-31

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  6. A Practical Approach to Catastrophe Planning.

    ERIC Educational Resources Information Center

    Ritz, James R.

    1987-01-01

    With more and more users in colleges and universities relying on electronic information, the need for a contingency plan in the event of a disaster has become more pressing. Setting objectives, impact analysis, interim processing strategy, working with users, and a two-level approach are discussed. (MLW)

  7. Planning applications in image analysis

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1994-01-01

    We describe two interim results from an ongoing effort to automate the acquisition, analysis, archiving, and distribution of satellite earth science data. Both results are applications of Artificial Intelligence planning research to the automatic generation of processing steps for image analysis tasks. First, we have constructed a linear conditional planner (CPed), used to generate conditional processing plans. Second, we have extended an existing hierarchical planning system to make use of durations, resources, and deadlines, thus supporting the automatic generation of processing steps in time and resource-constrained environments.

  8. An interim overview of LDEF materials findings

    SciTech Connect

    Stein, B.A.

    1992-12-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effects (SEE) on materials that is unparalleled in the history of the U.S. Space Program. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials on the same space vehicle. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. In general, the LDEF data is remarkably consistent; LDEF will provide a benchmark for materials design data bases for satellites in low-Earth orbit. Some materials were identified to be encouragingly resistant to LEO SEE for 5.8 years; other space qualified materials displayed significant environmental degradation. Molecular contamination was widespread; LDEF offers an unprecedented opportunity to provide a unified perspective of unmanned LEO spacecraft contamination mechanisms. New material development requirements for long-term LEO missions have been identified and current ground simulation testing methods/data for new, durable materials concepts can be validated with LDEF results. LDEF findings are already being integrated into the design of Space Station Freedom.

  9. Canada critiques NAPAP interim assessment report

    SciTech Connect

    Not Available

    1988-02-01

    According to the Atmospheric Environment Service of Environment Canada, the Executive Summary of the US National Acid Precipitation Assessment Program Interim Assessment report entitled The Causes and Effects of Acidic Deposition suggests five basic conclusions: (1) the effects of acid rain are neither widespread nor serious; (2) there will be no abrupt changes in the effects of acid rain for the next several decades; (3) emission levels of sulfur dioxide have been nearly constant since the 1920's, are currently stable, and will decrease substantially over the next three to four decades through the application of new technologies due to market forces; (4) the effects of acid rain are less than were anticipated ten years ago; (5) sufficient uncertainties remain to preclude determining whether abatement action is needed or the nature of that action. According to the Atmospheric Environment Service, these conclusions misrepresent the information contained in the main body of the NAPAP (National Acid Precipitation Assessment Program) report and have failed to take account of pertinent and relevant information omitted from the report. This paper presents Canada's rebuttal to each point.

  10. An interim overview of LDEF materials findings

    NASA Technical Reports Server (NTRS)

    Stein, Brad A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effects (SEE) on materials that is unparalleled in the history of the U.S. Space Program. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials on the same space vehicle. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. In general, the LDEF data is remarkably consistent; LDEF will provide a 'benchmark' for materials design data bases for satellites in low-Earth orbit. Some materials were identified to be encouragingly resistant to LEO SEE for 5.8 years; other 'space qualified' materials displayed significant environmental degradation. Molecular contamination was widespread; LDEF offers an unprecedented opportunity to provide a unified perspective of unmanned LEO spacecraft contamination mechanisms. New material development requirements for long-term LEO missions have been identified and current ground simulation testing methods/data for new, durable materials concepts can be validated with LDEF results. LDEF findings are already being integrated into the design of Space Station Freedom.

  11. The EMEFS model evaluation. An interim report

    SciTech Connect

    Barchet, W.R.; Dennis, R.L.; Seilkop, S.K.; Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K.; Byun, D.; McHenry, J.N.; Karamchandani, P.; Venkatram, A.; Fung, C.; Misra, P.K.; Hansen, D.A.; Chang, J.S.

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  12. Interim final rules for nondiscrimination in health coverage in the group market. Internal Revenue Service, Department of the Treasury; Pension and Welfare Benefits Administration, Department of Labor; Health Care Financing Administration, Department of Health and Human Services. Interim final rules with request for comments.

    PubMed

    2001-01-08

    This document contains interim final rules governing the provisions prohibiting discrimination based on a health factor for group health plans and issuers of health insurance coverage offered in connection with a group health plan. The rules contained in this document implement changes made to the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA), and the Public Health Service Act (PHS Act) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA).

  13. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to approved plan. North Dakota Administrative Code Chapter 33-15-13, National Emission Standards for Hazardous... interim approval of North Dakota's Title V Operating Permit program, in which it granted delegation of...

  14. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to approved plan. North Dakota Administrative Code Chapter 33-15-13, National Emission Standards for Hazardous... interim approval of North Dakota's Title V Operating Permit program, in which it granted delegation of...

  15. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to approved plan. North Dakota Administrative Code Chapter 33-15-13, National Emission Standards for Hazardous... interim approval of North Dakota's Title V Operating Permit program, in which it granted delegation of...

  16. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to approved plan. North Dakota Administrative Code Chapter 33-15-13, National Emission Standards for Hazardous... interim approval of North Dakota's Title V Operating Permit program, in which it granted delegation of...

  17. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to approved plan. North Dakota Administrative Code Chapter 33-15-13, National Emission Standards for Hazardous... interim approval of North Dakota's Title V Operating Permit program, in which it granted delegation of...

  18. DOE plan for UMTRA Project water protection standards

    SciTech Connect

    Not Available

    1986-07-01

    This plan was developed to define DOE's implementation of water protection standards for the UMTRA Project, on an interim basis, until the EPA promulgates revised standards in response to the September, 1985, decision by the Tenth Circuit Court of Appeals. This plan presents the historical background of the development of the Title I standards and the rationale for the DOE implementation approach.

  19. 77 FR 52614 - Pre-Existing Condition Insurance Plan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... HUMAN SERVICES 45 CFR Part 152 RIN 0938-AQ70 Pre-Existing Condition Insurance Plan Program AGENCY... regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan... provide immediate access to coverage for eligible uninsured Americans with pre-existing...

  20. Interim analysis for binary outcome trials with a long fixed follow-up time and repeated outcome assessments at pre-specified times.

    PubMed

    Parpia, Sameer; Julian, Jim A; Gu, Chushu; Thabane, Lehana; Levine, Mark N

    2014-01-01

    In trials with binary outcomes, assessed repeatedly at pre-specified times and where the subject is considered to have experienced a failure at the first occurrence of the outcome, interim analyses are performed, generally, after half or more of the subjects have completed follow-up. Depending on the duration of accrual relative to the length of follow-up, this may be inefficient, since there is a possibility that the trial will have completed accrual prior to the interim analysis. An alternative is to plan the interim analysis after subjects have completed follow-up to a time that is less than the fixed full follow-up duration. Using simulations, we evaluated three methods to estimate the event proportion for the interim analysis in terms of type I and II errors and the probability of early stopping. We considered: 1) estimation of the event proportion based on subjects who have been followed for a pre-specified time (less than the full follow-up duration) or who experienced the outcome; 2) estimation of the event proportion based on data from all subjects that have been randomized by the time of the interim analysis; and 3) the Kaplan-Meier approach to estimate the event proportion at the time of the interim analysis. Our results show that all methods preserve and have comparable type I and II errors in certain scenarios. In these cases, we recommend using the Kaplan-Meier method because it incorporates all the available data and has greater probability of early stopping when the treatment effect exists.

  1. Estrogenicity of agricultural by-products

    USDA-ARS?s Scientific Manuscript database

    Some Minnesota farms were found to have reduced conception rates in cattle receiving embryo transfers by a local veterinarian, and dietary components were called into question. Affected farms were feeding agricultural by-products, available in either a “shredded” form or a pelletized form. These by-...

  2. Accounting Systems 40S. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg.

    This curriculum guide was developed for a senior-level accounting course for students in high schools in Manitoba. The course is designed for students who plan to engage in an entry-level accounting position or self-employment after graduation and for students who plan postsecondary study in accounting and business. The course builds on and…

  3. Interim Courses: The World as a Classroom.

    ERIC Educational Resources Information Center

    Shiflet, George W. Jr.; Shealy, Malcolm H., Jr.

    1989-01-01

    Described are some of the considerations necessary in planning a field studies course in the tropics. Discussed are site selection; planning and preparation; course structure; the advantages of travel courses; and recommendations concerning liability, multiple instructors, hotels, sailboats, and tours. A list of 26 references is included. (CW)

  4. Interim Courses: The World as a Classroom.

    ERIC Educational Resources Information Center

    Shiflet, George W. Jr.; Shealy, Malcolm H., Jr.

    1989-01-01

    Described are some of the considerations necessary in planning a field studies course in the tropics. Discussed are site selection; planning and preparation; course structure; the advantages of travel courses; and recommendations concerning liability, multiple instructors, hotels, sailboats, and tours. A list of 26 references is included. (CW)

  5. Acceleration of the remediation process through interim action

    SciTech Connect

    Clark, T.R.; Throckmorton, J.D.; Hampshire, L.H.; Dalga, D.G.; Janke, R.J.

    1993-11-01

    During the Remedial Investigation and Feasibility Study (RI/FS) phase of a CERCLA cleanup, it is possible to implement interim actions at a site ``to respond to an immediate site threat or take advantage of an opportunity to significantly reduce risk quickly.`` An interim action is a short term action that addresses threats to public health and safety and is generally followed by the RI/FS process to achieve complete long term protection of human health and the environment. Typically, an interim action is small in scope and can be implemented quickly to reduce risks, such as the addition of a security fence around a known or suspected hazard, or construction of a temporary cap to reduce run-on/run-off from a contaminant source. For more specialized situations, however, the possibility exists to apply the intent of the interim action guidance to a much larger project scope. The primary focus of this paper is the discussion of the interim action approach for streamlined remedial action and presentation of an example large-scale project utilizing this approach at the Fernald Environmental Management Project (FEMP).

  6. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will...

  7. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will...

  8. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will...

  9. Comparison of conditional bias-adjusted estimators for interim analysis in clinical trials with survival data.

    PubMed

    Shimura, Masashi; Gosho, Masahiko; Hirakawa, Akihiro

    2017-02-17

    Group sequential designs are widely used in clinical trials to determine whether a trial should be terminated early. In such trials, maximum likelihood estimates are often used to describe the difference in efficacy between the experimental and reference treatments; however, these are well known for displaying conditional and unconditional biases. Established bias-adjusted estimators include the conditional mean-adjusted estimator (CMAE), conditional median unbiased estimator, conditional uniformly minimum variance unbiased estimator (CUMVUE), and weighted estimator. However, their performances have been inadequately investigated. In this study, we review the characteristics of these bias-adjusted estimators and compare their conditional bias, overall bias, and conditional mean-squared errors in clinical trials with survival endpoints through simulation studies. The coverage probabilities of the confidence intervals for the four estimators are also evaluated. We find that the CMAE reduced conditional bias and showed relatively small conditional mean-squared errors when the trials terminated at the interim analysis. The conditional coverage probability of the conditional median unbiased estimator was well below the nominal value. In trials that did not terminate early, the CUMVUE performed with less bias and an acceptable conditional coverage probability than was observed for the other estimators. In conclusion, when planning an interim analysis, we recommend using the CUMVUE for trials that do not terminate early and the CMAE for those that terminate early. Copyright © 2017 John Wiley & Sons, Ltd.

  10. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    SciTech Connect

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described.

  11. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  12. High Temperature Materials Interim Data Qualification Report

    SciTech Connect

    Nancy Lybeck

    2010-08-01

    ABSTRACT Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: 1. Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing – 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. 2. Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram – 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  13. Presidential Change: Interim Administrations in Higher Education. AIR 1994 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Everley, Mary L.

    This study examined the status of the interim presidency at public research/doctorate-granting universities. A questionnaire soliciting demographic data on interim presidential utilization was sent to the institutional research offices at 134 universities, and the returned questionnaires, 20 interim presidents were selected to participate in…

  14. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... AGENCY 40 CFR Part 180 Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances... the extension of the time-limited interim tolerances for the combined residues of the insecticide... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  15. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on...

  16. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Issuance of interim binder; terms and conditions. 308... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms and conditions. Upon acceptance of an application, an interim binder in form as set forth in §...

  17. 46 CFR 308.202 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Issuance of interim binder; terms and conditions. 308... OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.202 Issuance of interim binder; terms and conditions. Upon acceptance of an application, an interim binder in form as set...

  18. 26 CFR 1.848-3 - Interim rules for certain reinsurance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Interim rules for certain reinsurance agreements... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Other Insurance Companies § 1.848-3 Interim rules for certain... before November 15, 1991. (b) Interim rules. In determining a company's gross amount of premiums...

  19. 10 CFR 205.199G - Extension of time; Interim and Ancillary Orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Extension of time; Interim and Ancillary Orders. 205.199G... Extension of time; Interim and Ancillary Orders. The Director of the Office of Hearings and Appeals or his... initiative issue any interim or ancillary Orders, reconsider any determinations, or make any rulings...

  20. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  1. Peanut by-products fed to cattle.

    PubMed

    Hill, Gary M

    2002-07-01

    Peanut by-products supply substantial quantities of feedstuffs to beef cattle grown in the same region where peanuts are produced. Included in the list of products fed to cattle are peanuts and peanut meal, peanut skins, peanut hulls, peanut hay, and silages. Residual peanut hay is by far the most widely used peanut by-product fed to beef cattle, and if it is properly harvested with minimal leaf shatter, it is comparable to good-quality grass hays in nutrient content. Peanut skins are often included in small quantities in cattle and pet foods, supplying both protein and energy. High tannin content of peanut skins can cause severe performance depressions in beef cattle if peanut skins are included at levels higher than 10% of the diet, unless diets contain relatively high CP (above 15% CP), or additional N sources are added such as ammonia or urea. Because dairy cattle diets are often above 16% CP in the total dietary DM, peanut skins may increase milk production when added at levels up to 16% of the dry matter. Peanut hulls are effectively used as a roughage source at levels up to 20% of beef finishing diets, for bedding in dairy cattle loafing sheds (if tested and found to contain low aflatoxin levels), and in a variety of manufactured products. Peanut hulls are economically priced because of their quantity, their inherent high fiber, and low CP content, and they should not be fed as a primary feedstuffs for beef cattle. Peanut by-products are generally priced below other by-products, and they can be incorporated into a variety of supplements and diets for cow herds, growing-finishing cattle, and dairy cattle.

  2. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management unit will receive additional hazardous wastes, no later than one year after the date on which the...-closure plan to the Regional Administrator no later than 15 days after: (1) Termination of interim status... determines that the hazardous waste management unit or facility must be closed as a landfill, subject to...

  3. 24 CFR 903.11 - Are certain PHAs eligible to submit a streamlined Annual Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans § 903.11 Are... high performing PHAs as of the last annual or interim assessment of the PHA before the submission of... plans must provide information on how the public may reasonably obtain additional information on the PHA...

  4. 24 CFR 903.11 - Are certain PHAs eligible to submit a streamlined Annual Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans § 903.11 Are... high performing PHAs as of the last annual or interim assessment of the PHA before the submission of... plans must provide information on how the public may reasonably obtain additional information on the PHA...

  5. 24 CFR 903.11 - Are certain PHAs eligible to submit a streamlined Annual Plan?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS PHA Plans § 903.11 Are... high performing PHAs as of the last annual or interim assessment of the PHA before the submission of... plans must provide information on how the public may reasonably obtain additional information on the PHA...

  6. Interim Measure/Interim Action Post-Construction Report (PCR) for the Old Radioactive Waste Burial Ground (643-E)

    SciTech Connect

    Bennett, J.

    2002-06-18

    The Burial Ground Complex (BGC) occupies approximately 194 acres in the central part of Savannah River Site (SRS) in E-Area between the F and H Separations Areas. The BGC is divided into a northern area containing approximately 118 acres and a southern area containing approximately 76 acres. The southern area is the Old Radioactive Waste Burial Ground (ORWBG), 643-E, which consists of an earthen trench disposal area that began receiving waste in 1952 and was filled in 1972. This portion of the BGC is addressed by this interim measure/interim action.

  7. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Retired Reserve for members of the Retired Reserve. Interim final rule with comment period.

    PubMed

    2010-08-06

    This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  8. Flexible stopping boundaries when changing primary endpoints after unblinded interim analyses.

    PubMed

    Chen, Liddy M; Ibrahim, Joseph G; Chu, Haitao

    2014-01-01

    It has been widely recognized that interim analyses of accumulating data in a clinical trial can inflate type I error. Different methods, from group sequential boundaries to flexible alpha spending functions, have been developed to control the overall type I error at prespecified level. These methods mainly apply to testing the same endpoint in multiple interim analyses. In this article, we consider a group sequential design with preplanned endpoint switching after unblinded interim analyses. We extend the alpha spending function method to group sequential stopping boundaries when the parameters can be different between interim, or between interim and final analyses.

  9. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... AGENCY RIN 2050-ZA05 Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA...) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive... draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated...

  10. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    SciTech Connect

    Boehlecke, R. F.

    2011-10-24

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, and verified free of contents.

  11. PROJECT W-551 SUMMARY INFORMATION FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    SciTech Connect

    AR, TEDESCHI

    2008-08-11

    This report provides summary data for use by the decision board to assess and select the final technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-fonnaldebyde resin. This document provides a summary of comparative data against prior weighted criteria to support technology selection. Supporting details and background for this summary are documented in the separate report, RPP-RPT-37741.

  12. IUS/TUG orbital operations and mission support study. Volume 2: Interim upper stage operations

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.

  13. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    SciTech Connect

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  14. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    SciTech Connect

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project.

  15. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    SciTech Connect

    Burbank, D.A.

    1998-05-19

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project.

  16. Adjustable Autonomy and Human-Agent Teamwork in Practice: An Interim Report on Space Applications

    NASA Technical Reports Server (NTRS)

    Bradshaw, Jeffrey M.; Feltovich, Paul; Hoffman, Robert; Jeffers, Renia; Suri, Niranhan; Uszok, Andrzej; VanHoof, Ron; Acquisti, Alessandro; Prescott, Debbie

    2003-01-01

    We give a preliminary perspective on the basic principles and pitfalls of adjustable autonomy and human-centered teamwork. We then summarize the interim results of our study on the problem of work practice modeling and human-agent collaboration in space applications, the development of a broad model of human-agent teamwork grounded in practice, and the integration of the Brahms, KAoS, and NOMADS agent frameworks. We hope our work will benefit those who plan and participate in work activities in a wide variety of space applications, as well as those who are interested in design and execution tools for teams of robots that can function as effective assistants to humans.

  17. Interim Safe Storage of Plutonium Production Reactors at the US DOE Hanford Site - 13438

    SciTech Connect

    Schilperoort, Daryl L.; Faulk, Darrin

    2013-07-01

    Nine plutonium production reactors located on DOE's Hanford Site are being placed into an Interim Safe Storage (ISS) period that extends to 2068. The Environmental Impact Statement (EIS) for ISS [1] was completed in 1993 and proposed a 75-year storage period that began when the EIS was finalized. Remote electronic monitoring of the temperature and water level alarms inside the safe storage enclosure (SSE) with visual inspection inside the SSE every 5 years are the only planned operational activities during this ISS period. At the end of the ISS period, the reactor cores will be removed intact and buried in a landfill on the Hanford Site. The ISS period allows for radioactive decay of isotopes, primarily Co-60 and Cs-137, to reduce the dose exposure during disposal of the reactor cores. Six of the nine reactors have been placed into ISS by having an SSE constructed around the reactor core. (authors)

  18. Adjustable Autonomy and Human-Agent Teamwork in Practice: An Interim Report on Space Applications

    NASA Technical Reports Server (NTRS)

    Bradshaw, Jeffrey M.; Feltovich, Paul; Hoffman, Robert; Jeffers, Renia; Suri, Niranhan; Uszok, Andrzej; VanHoof, Ron; Acquisti, Alessandro; Prescott, Debbie

    2003-01-01

    We give a preliminary perspective on the basic principles and pitfalls of adjustable autonomy and human-centered teamwork. We then summarize the interim results of our study on the problem of work practice modeling and human-agent collaboration in space applications, the development of a broad model of human-agent teamwork grounded in practice, and the integration of the Brahms, KAoS, and NOMADS agent frameworks. We hope our work will benefit those who plan and participate in work activities in a wide variety of space applications, as well as those who are interested in design and execution tools for teams of robots that can function as effective assistants to humans.

  19. Executive summary of NAPAP's interim assessment of acidic deposition effects

    SciTech Connect

    Not Available

    1987-11-01

    The National Acid Precipitation Assessment Program (NAPAP), released its interim assessment of the causes and effects of acid rain. The four-volume report presents the current state of knowledge about acid rain at about halfway through NAPAP's 10 year scientific investigation of the problem.

  20. 48 CFR 801.690-8 - Interim appointment provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Interim appointment provisions. 801.690-8 Section 801.690-8 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development,...

  1. Marine Biochemistry: A New Interdisciplinary Course for the Interim

    ERIC Educational Resources Information Center

    Goldberg, Arthur S.

    1976-01-01

    Discusses an undergraduate course which includes lectures, laboratory, and field trips and is designed for the interim winter semester. The course is interdisciplinary, involving a study of the biochemistry, pharmacology, and physiological significance of compounds from marine flora and fauna. (MLH)

  2. Making the Most of Interim Assessment Data. Lessons from Philadelphia

    ERIC Educational Resources Information Center

    Christman, Jolley Bruce; Neild, Ruth Curran; Bulkley, Katrina; Blanc, Suzanne; Liu, Roseann; Mitchell, Cecily; Travers, Eva

    2009-01-01

    Under No Child Left Behind, urban school districts have increasingly turned to interim assessments, administered at regular intervals, to help gauge student progress in advance of annual state exams. These assessments have spawned growing debate among educators, assessment experts, and the testing industry: are they worth the significant…

  3. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of this chapter, or the interim status standards for thermal treatment units provided by subpart P of... hazardous waste; and (E) A description of the air pollution control system on each device burning hazardous...), respectively, the estimated uncontrolled (at the inlet to the air pollution control system) emissions...

  4. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    SciTech Connect

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  5. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... presented in the annual financial statements that exceeds 20% of sales or gross revenues, provision for... accounting principles or practices. (Financial institutions should substitute net interest income for sales... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial...

  6. Performance Criteria for the Luminous Environment. Interim Report.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    This interim report informs the eventual user of the direction of the long-term program; specific criteria are not provided. Five current guidelines in lighting practice were disavowed as follows--(1) that low levels of illumination cause organic harm to the eyes, (2) that the footcandle is the best criterion for determining the proper…

  7. Nonmanufacturing Businesses. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    Cornog, June R.; Bunten, Elaine D.

    In this fifth interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a primary stratified sample of 2,828 nonmanufacturing firms was randomly selected from 28,184 businesses taken from Social Security files, a secondary sample of 2,258 firms was randomly selected for replacement…

  8. Building an Interim Assessment System: A Workbook for School Districts

    ERIC Educational Resources Information Center

    Crane, Eric W.

    2010-01-01

    As someone with a stake in a school district's systems, a person probably does not have all the answers around what is necessary to build an effective interim assessment system. Neither does this workbook. But it is intended to have the right questions. More precisely, this workbook contains the vision, infrastructure, and resource questions…

  9. Early Childhood Development Program, 1986-87. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Rachal, Janella

    This interim evaluation of Louisiana's 1986-87 Early Childhood Development Program focuses primarily on ongoing second and third year projects, but also provides some descriptive information about the general characteristics and implementation strategies of first year projects. The purpose of the evaluation was to provide information to decision…

  10. Ocotillo: Improving Learning through Instruction. Interim Report, 1988-89.

    ERIC Educational Resources Information Center

    Jacobs, Alan, Ed.; Walters, Jim, Ed.

    As a result of a Technology Retreat sponsored by the Maricopa Community Colleges (Arizona) in 1988, action/research groups were formed to explore the various challenges of implementing instructional technology effectively. This interim report reviews the work of the groups, with a summary report from each, as follows: (1) "Alternative Funding…

  11. Study of the Voluntary Public School Choice Program. Interim Report

    ERIC Educational Resources Information Center

    Yin, Robert K.; Ahonen, Pirkko; Kim, Dawn

    2007-01-01

    The purpose of the Voluntary Public School Choice (VPSC) Program is to assist states and local school districts in the development of innovative strategies to expand options for students, and to encourage transfers of students from low-performing to higher-performing schools. This report presents interim findings from the National Evaluation of…

  12. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. Link to an... disability wishes to travel is already provided by an accessible bus, the operator has met this requirement... accessible buses (e.g., a small fixed-route operator who exclusively or primarily purchases or leases...

  13. Engineering Standards. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This report is the 11th in a series of interim reports stemming from the U.S. Metric Study, which is being conducted by the National Bureau of Standards in accordance with the Metric Study Act of 1968 (Public Law 90-472). Although it mainly concerns the relationships of measurement units to engineering standards, the issue of international…

  14. SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVAL

    NASA Image and Video Library

    2016-06-19

    SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVES AT WEST DOCK ON SHIELDS ROAD AND IS OFF LOADED FROM BARGEUAH ENGINEERING STUDENT ROBERT HILLAN TALKS TO SPACE STATION CREW MEMBERS ABOUT HIS WINNING 3-D PRINTED TOOL DESIGNED FOR USE ON ISS, AND IS INTERVIEWED BY LOCAL MEDIA

  15. Public School Finance Problems in Texas. An Interim Report.

    ERIC Educational Resources Information Center

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  16. 48 CFR 801.690-8 - Interim appointment provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Interim appointment provisions. 801.690-8 Section 801.690-8 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting...

  17. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 301.603-3...

  18. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 301.603-3...

  19. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 301.603-3...

  20. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  1. Education: U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This interim report, as the sixth in a series was prepared to provide a better basis for Congressional evaluation of the feasibility of a United States changeover to a metric system. This study concerning the effects of increasing worldwide use of the metric system on education in the United States was carried out by the Education Development…

  2. US/USSR Textbook Study Project, Interim Report.

    ERIC Educational Resources Information Center

    Association of American Publishers, New York, NY.

    This interim report, intended to help textbook authors and publishers, describes the results of a project in which American schools critiqued Soviet textbooks and Soviet scholars critiqued American textbooks. Secondary level history and geography texts were the focus of the study. There are five chapters to the report: Background to the Study;…

  3. INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE UNLOADED PRIOR T

    NASA Image and Video Library

    2016-06-20

    TWO CRANES LIFT THE APPROXIMATELY 8,000-POUND INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE OUT OF ITS CRATE AT MARSHALL. THE TEST ARTICLE ARRIVED AT MARSHALL SPACE FLIGHT CENTER VIA BARGE ON THE TENNESSEE RIVER AND WAS TRANSPORTED TO BUILDING 4649 WHERE TESTING WILL BEGIN.

  4. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged research...

  5. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  6. 14 CFR 91.871 - Waivers from interim compliance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Operating Noise Limits § 91.871 Waivers from interim compliance requirements. (a) Any U.S. operator or foreign air... with respect to new airplanes or noise-abatement equipment. (d) Waivers will be granted only upon a...

  7. Interim Sanitary Landfill Groundwater Monitoring Report (1998 Annual Report)

    SciTech Connect

    Wells, D.

    1999-03-18

    The SRS Interim Sanitary Landfill opened in Mid-1992 and operated until 1998 under Domestic Waste Permit No. 025500-1120. Several contaminants have been detected in the groundwater beneath the unit.The well sampling and analyses were conducted in accordance with Procedure 3Q5, Hydrogeologic Data Collection.

  8. 40 CFR 264.3 - Relationship to interim status standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Relationship to interim status standards. 264.3 Section 264.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL...

  9. 40 CFR 281.23 - Schedule for interim approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Schedule for interim approval. 281.23 Section 281.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) APPROVAL OF STATE UNDERGROUND STORAGE TANK PROGRAMS Components of a Program Application § 281.23...

  10. President's Information Technology Advisory Committee Interim Report to the President.

    ERIC Educational Resources Information Center

    National Coordination Office for Information Technology Research and Development, Arlington, VA.

    This document is the Interim Report on future directions for Federal support of research and development in high performance computing, communications, information technology, and the Next Generation Internet. This report provides a more detailed explanation of the findings and recommendations summarized by the President's Information Technology…

  11. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... effect between us and the State if we are to repay the State for interim assistance. The following requirements must be part of the agreement: (a) SSA to repay the State. We must agree to repay the State...

  12. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... effect between us and the State if we are to repay the State for interim assistance. The following requirements must be part of the agreement: (a) SSA to repay the State. We must agree to repay the State...

  13. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... effect between us and the State if we are to repay the State for interim assistance. The following requirements must be part of the agreement: (a) SSA to repay the State. We must agree to repay the State...

  14. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... effect between us and the State if we are to repay the State for interim assistance. The following requirements must be part of the agreement: (a) SSA to repay the State. We must agree to repay the State...

  15. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... effect between us and the State if we are to repay the State for interim assistance. The following requirements must be part of the agreement: (a) SSA to repay the State. We must agree to repay the State...

  16. Penalty Inflation Adjustments for Civil Money Penalties. Interim Final Rule.

    PubMed

    2016-06-27

    In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990, as amended by the Debt Collection Improvement Act of 1996, and further amended by the Bipartisan Budget Act of 2015, section 701: Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, this interim final rule incorporates the penalty inflation adjustments for the civil money penalties contained in the Social Security Act

  17. Ocotillo: Improving Learning through Instruction. Interim Report, 1989-90.

    ERIC Educational Resources Information Center

    Walters, Jim, Ed.; Jacobs, Alan, Ed.

    Continuing work begun at a 1988 conference, the Ocotillo Action/Research Groups of the Maricopa Community Colleges (Arizona) explored ways to enhance the use of educational technology and to capitalize on future developments in the field. These interim reports cover work done in 1989-90 and serve as a basis for the next projected conference. The…

  18. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) MEDICARE PROGRAM (CONTINUED) HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic... under the PIP method unless the hospice requests a longer fixed interval (not to exceed one...

  19. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) MEDICARE PROGRAM (CONTINUED) HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic... under the PIP method unless the hospice requests a longer fixed interval (not to exceed one...

  20. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) MEDICARE PROGRAM (CONTINUED) HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic... under the PIP method unless the hospice requests a longer fixed interval (not to exceed one...

  1. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... regulation may be omitted. (2) Interim balance sheets shall include only major captions (i.e., numbered... face of the balance sheet or in the notes to the financial statements, if applicable. Where any major balance sheet caption is less than 10% of total assets, and the amount in the caption has not increased...

  2. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged research...

  3. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged research...

  4. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged research...

  5. "Intelligent" Computer Assisted Instruction (CAI) Applications. Interim Report.

    ERIC Educational Resources Information Center

    Brown, John Seely; And Others

    Interim work is documented describing efforts to modify computer techniques used to recognize and process English language requests to an instructional simulator. The conversion from a hand-coded to a table driven technique are described in detail. Other modifications to a simulation based computer assisted instruction program to allow a gaming…

  6. Interim medical decontamination handbook preparation. Phase 1: test plan development. Interim report (Final), August 1983-April 1985

    SciTech Connect

    Ehntholt, D.J.

    1986-11-01

    In order to identify materials readily available on USAF bases, which might be used in an emergency to decontaminate casualties who had been exposed to chemical warfare agents, a series of tasks were conducted. These included the development of a skin contamination/decontamination model from relevant literature, the identification of evaluation criteria, and the formulation of a proposed laboratory test program.

  7. Intrinsic bioremediation of landfills interim report

    SciTech Connect

    Brigmon, R.L.; Fliermans, C.B.

    1997-07-14

    Intrinsic bioremediation is a risk management option that relies on natural biological and physical processes to contain the spread of contamination from a source. Evidence is presented in this report that intrinsic bioremediation is occurring at the Sanitary Landfill is fundamental to support incorportion into a Corrective Action Plan (CAP).

  8. Office of Educational Leadership Interim Legislative Report.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Office of Educational Leadership.

    In 1989, the Minnesota Office of Educational Leadership (OEL) was directed to develop a plan for a 2-year research project to determine the effectiveness of a learner outcome-based system of education in improving pupil learning. Ten research and development project sites comprising 17 districts and 5 educational consortia received grants of…

  9. E3 Success Story - Working Together: E3 Ohio and the Ohio By-Product Synergy Network

    EPA Pesticide Factsheets

    The Mid-Ohio Regional Planning Commission (MORPC) received funding to support the integration of the national E3 sustainability initiative with the Ohio By-Product Synergy (BPS) Network to create an efficient and replicable model for reducing GHGs.

  10. ADVANCED GASIFICATION BY-PRODUCT UTILIZATION

    SciTech Connect

    Rodney Andrews; Aurora Rubel; Jack Groppo; Ari Geertsema; M. Mercedes Maroto-Valer; Zhe Lu; Harold Schobert

    2005-04-01

    The results of laboratory investigations and supporting technical assessments conducted under DOE Subcontract No. DE-FG26-03NT41795 are reported for the period September 1, 2003 to August 31, 2004. This contract is with the University of Kentucky Research Foundation, which supports work with the University of Kentucky Center for Applied Energy Research and The Pennsylvania State University Energy Institute. The worked described was part of a project entitled ''Advanced Gasification By-Product Utilization''. This work involves the development of technologies for the separation and characterization of coal gasification slags from operating gasification units, activation of these materials to increase mercury and nitrogen oxide capture efficiency, assessment of these materials as sorbents for mercury and nitrogen oxides, and characterization of these materials for use as polymer fillers.

  11. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2011-02-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm-2, ERA-Interim overestimates the ISR by 10 Wm-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  12. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2010-09-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 26%. A GPCP-corrected version of ERA-Interim is less biased (10-15%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6-8 W m-2, ERA-Interim overestimates the ISR by 9-10 W m-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  13. Interim assessment of the VAL automated guideway transit system. Interim report

    SciTech Connect

    Anagnostopoulos, G.

    1981-11-01

    This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This report contains a technical description and performance data resulting from a demonstration test program performed concurrently in August 1980. VAL is the first driverless AGT urban system application in France. The system operates at grade, elevated, and in tunnels on an exclusive concrete dual-lane guideway that is 12.7 kilometers long. The configuration of the system is a push-pull loop operating between 17 on-line stations. The system is designed to provide scheduled operation at 60-second headways and a normal one-way capacity of 7440 passengers per hour per direction with 55 percent of the passengers seated. Two pneumatic-tired vehicles are coupled into a single vehicle capable of carrying 124 passengers at line speeds of 60 km/hr. During the course of the demonstration test program, VAL demonstrated that it could achieve high levels of dependability and availability and could perform safely under all perceivable conditions.

  14. Interim program for land cover mapping in Alaska utilizing Landsat digital data

    USGS Publications Warehouse

    Shasby, Mark; Carneggie, David; Gaydos, Leonard; Fitzpatrick-Lins, Katherine; Lauer, Donald; Ambrosia, Vincent; Benjamin, Susan

    1985-01-01

    The enactment of the Alaska National Interest Lands Conservation Act (ANILCA) in 1980 imposed mandates on all major land management agencies in Alaska to prepare comprehensive resource and management plans to assess wildlife habitat, oil and gas exploration and development, wild and scenic river, land disposals, timber production, and archaeological and cultural resources, To meet these objective, the U. S. Geological Survey (USGS) has embarked on a plan to classify land cover for the entire State of Alaska using Landsat digital data. the USGS, in cooperation with other agencies, has completely Landsat-derived land use and land cover classification of 115 million acres for the State of Alaska. With this work as a substantial foundation, the USGS has prepared a comprehensive plan for classifying the remaining areas of Alaska. The development of this program will lead to a complete interim land use and land cover classification system for Alaska and provide for the dissemination of map products, statistics, and acreage summaries for all areas of Alaska at 1:250,000 scale. It also allows for the dissemination of Landsat digital data for those areas.

  15. 76 FR 44491 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ...-AQ66 Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals and... amendment to the interim final rules (76 FR 37208) entitled, ``Group Health Plans and Health Insurance... rule with request for comments entitled, ``Group Health Plans and Health Insurance Issuers:...

  16. Olive by-products in pig fattening.

    PubMed

    Rupić, V; Jerković, I; Bozac, R; Glowattzky, D; Muźic, S; Hrabak, V

    1997-01-01

    The utilisation in pig fattening of diets with various proportions of dried olive cake, i.e., olive by-product resulting from centrifugal separation, was investigated in 60 Swedish Landrace x Large White crossbreds (30 castrates and 30 gilts). The pigs were divided into three equal groups (10 + 10): two experimental groups, fed with a fodder mix containing 50 g/kg and 80 g/kg respectively of dried olive cake, and a control group, fed with the same mix but minus the cake. The experiment last 90 days. For the first 45 days the pigs were given the starter, and for the second 45 days the finisher, mix. Throughout the whole period, pigs in both experimental groups achieved greater average body mass and mass gain than the control animals. Concurrently, castrates in all three groups, became heavier and demonstrated greater mass gain than did the gilts. While supplied respectively with the finisher mix throughout the whole test period, pigs fed mixes with 50 g/kg of dried olive cake demonstrated significantly greater feed consumption than those fed without the cake and than those fed mixes with 80 g/kg of cake. While supplied with the starter mix, pigs fed mixes with 50 g/kg of dried olive cake achieved the lowest feed conversion rate, whereas those supplied with the finisher mix achieved the highest. Throughout the entire period no significant differences were observed in feed conversion rate among pig groups.

  17. Design requirements document for the interim store phase I solidified high-level waste function 4.2.4.1.2

    SciTech Connect

    Calmus, R.B.

    1996-09-30

    The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford site.t,,nk waste tr:atment and immobilization services using privatized facilities. This plan contains a two-phased approach. Phase I is a ``proof-of-principle/commercial demonstration-scale`` effort and Phase II is a full-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE furnished. The path forward adopted for Phase I solidified high-level waste (HLW) interim storage entails use of Vaut 2 and 3 in the Hanford Site Spent Nuclear Fuels Canister Storage Building (CSB), to be located in the Hanford Site 200 East Area. This design requirements document establishes the functions, with associated requirements, allocated to the Phase I solidified HLW interim storage system. These requirements will be used as the basis for conceptual design of the CSB and supporting systems. This document will also provide the basis for preparation of a performance specification for design and construction activities necessary to achieve the overall project mission.

  18. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect

    McCormack, R.L.

    1995-08-01

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  19. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    SciTech Connect

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  20. Advanced Gasification By-Product Utilization

    SciTech Connect

    Rodney Andrews; Aurora Rubel; Jack Groppo; Ari Geertsema; Frank Huggins; M. Mercedes Maroto-Valer; Brandie M. Markley; Harold Schobert

    2006-02-01

    With the recent passing of new legislation designed to permanently cap and reduce mercury emissions from coal-fired utilities, it is more important than ever to develop and improve upon methods of controlling mercury emissions. One promising technique is carbon sorbent injection into the flue gas of the coal-fired power plant. Currently, this technology is very expensive as costly commercially activated carbons are used as sorbents. There is also a significant lack of understanding of the interaction between mercury vapor and the carbon sorbent, which adds to the difficulty of predicting the amount of sorbent needed for specific plant configurations. Due to its inherent porosity and adsorption properties as well as on-site availability, carbons derived from gasifiers are potential mercury sorbent candidates. Furthermore, because of the increasing restricted use of landfilling, the coal industry is very interested in finding uses for these materials as an alternative to the current disposal practice. The results of laboratory investigations and supporting technical assessments conducted under DOE Subcontract No. DE-FG26-03NT41795 are reported for the period September 1, 2004 to August 31, 2005. This contract is with the University of Kentucky Research Foundation, which supports work with the University of Kentucky Center for Applied Energy Research and The Pennsylvania State University Energy Institute. The worked described was part of a project entitled ''Advanced Gasification By-Product Utilization''. This work involves the development of technologies for the separation and characterization of coal gasification slags from operating gasification units, activation of these materials to increase mercury and nitrogen oxide capture efficiency, assessment of these materials as sorbents for mercury and nitrogen oxides, and characterization of these materials for use as polymer fillers.