46 CFR 120.340 - Cable and wiring requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of... wires, rather than cables, are used in systems greater than 50 volts, the wire must be in conduit. (b... for the circuit in which they are used; (2) Be installed in a manner to avoid or reduce interference...
Reusable Hot-Wire Cable Cutter
NASA Technical Reports Server (NTRS)
Pauken, Michael T.; Steinkraus, Joel M.
2010-01-01
During the early development stage of balloon deployment systems for missions, nichrome wire cable cutters were often used in place of pyro-actuated cutters. Typically, a nichrome wire is wrapped around a bundle of polymer cables with a low melting point and connected to a relay-actuated electric circuit. The heat from the nichrome reduces the strength of the cable bundle, which quickly breaks under a mechanical load and can thus be used as a release mechanism for a deployment system. However, the use of hand-made heated nichrome wire for cutters is not very reliable. Often, the wrapped nichrome wire does not cut through the cable because it either pulls away from its power source or does not stay in contact with the cable being cut. Because nichrome is not readily soldered to copper wire, unreliable mechanical crimps are often made to connect the nichrome to an electric circuit. A self-contained device that is reusable and reliable was developed to sever cables for device release or deployment. The nichrome wire in this new device is housed within an enclosure to prevent it from being damaged by handling. The electric power leads are internally connected within the unit to the nichrome wire using a screw terminal connection. A bayonet plug, a quick and secure method of connecting the cutter to the power source, is used to connect the cutter to the power leads similar to those used in pyro-cutter devices. A small ceramic tube [0.25-in. wide 0.5-in. long (.6.4-mm wide 13-mm long)] houses a spiraled nichrome wire that is heated when a cable release action is required. The wire is formed into a spiral coil by wrapping it around a mandrel. It is then laid inside the ceramic tube so that it fits closely to the inner surface of the tube. The ceramic tube provides some thermal and electrical insulation so that most of the heat generated by the wire is directed toward the cable bundle in the center of the spiral. The ceramic tube is cemented into an aluminum block, which holds it in position. The leads of the nichrome wire are attached to screw terminals that connect them to power leads. A bayonet plug mounted at the bottom of the rectangular block connects the power leads to a relay circuit. A thin aluminum shell encloses the entire structure, leaving access points to attach to the bayonet plug and to feed a cable into the cylinder. The access holes for the deployment cable are a smaller diameter than the nichrome coil to prevent the cable from coming in direct contact with the nichrome when loaded. It uses the same general method of severing a cable with a heated wire as was used previously, but implements it in such a way that it is more reliable and less prone to failure. It creates a mechanism to create repeatability that was nonexistent in the previous method.
NASA Technical Reports Server (NTRS)
1972-01-01
A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.
NASA Technical Reports Server (NTRS)
Casey, E. J.; Commadore, C. C.; Ingles, M. E.
1980-01-01
Long wire bundles twist into uniform spiral harnesses with help of simple apparatus. Wires pass through spacers and through hand-held tool with hole for each wire. Ends are attached to low speed bench motor. As motor turns, operator moves hand tool away forming smooth twists in wires between motor and tool. Technique produces harnesses that generate less radio-frequency interference than do irregularly twisted cables.
The performance of cable braids and terminations to lightning induced transients
NASA Technical Reports Server (NTRS)
Crofts, David
1991-01-01
The latest specification detailing the test waveforms for indirect lightning transients as applied to aircraft wiring systems specify very high voltages and currents. Although considerable data exists for measuring cable screen leakage using such methods as surface transfer impedance and bulk cable injection, there is little data on the likely core transient level that is likely to be induced from these threats. In particular, the new Waveform 5 at very high current levels (10 kA) is reputed to cause severe cable damage. A range of representative cables were made with various screen termination techniques and screening levels. These were tested first to determine their relative screening performance and then they were subjected to lightning transient testing to all the specified waveforms. Core voltages were measured for each test. Tests were also performed on bundles with fewer wires to determine the failure criteria with Waveform 5 and these tests also include flat conductor cables. The test showed that correctly terminated cable bundles performed well in all the tests and would provide a high level of protection to the electronic systems. The use of overbraides, provided the individual screens are well terminated, appears to be unnecessary.
NASA Technical Reports Server (NTRS)
Lundquist, Ray A.; Leidecker, Henning
1998-01-01
The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.
NASA Technical Reports Server (NTRS)
Lundquist, Ray A.; Leidecker, Henning
1999-01-01
The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.
NASA Technical Reports Server (NTRS)
Lundquist, Ray A.; Leidecker, Henning
1998-01-01
The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.
Microbiological sampling of returned Surveyor 3 electrical cabling
NASA Technical Reports Server (NTRS)
Knittel, M. D.; Favero, M. S.; Green, R. H.
1972-01-01
A piece of electrical wiring bundle running from the television camera to another part of the spacecraft was selected for microbiological examination. Sampling methods are discussed. The results presented show that no viable microorganisms were recovered from the part of the Surveyor 3 cable which was tested. Factors that could have contributed to the sterility of the cable are thermal vacuum testing, natural dieoff, change in pressure during launch, and lunar vacuum and temperature.
NASA Astrophysics Data System (ADS)
Koopman, D. A.; Paul, C. R.
1984-08-01
Electrical devices (computers, radar systems, communication radios, etc.) are interconnected by wires on most present systems. Electromagnetic fields produced by the excitation of these wires will cause unintentional coupling of signals onto nearby wires. This undesired electromagnetic coupling is termed crosstalk. It is important to be able to determine whether these crosstalk signals will cause the devices at the ends of the wires to malfunction. Wires are often grouped together in cable bundles or harnesses. The close proximity of wires in these bundles enhances the possibility that the crosstalk levels will be sufficiently large to cause malfunctions. The ability to predict crosstalk levels and the means to control crosstalk when it causes a problem are important to optimum system design. It interference of this type is allowed to surface during final system tests, a costly and time consuming retrofit of the wiring or the addition of filters and other interference control measures may be required.
Advanced wiring technique and hardware application: Airplane and space vehicle
NASA Technical Reports Server (NTRS)
Ernst, H. L.; Eichman, C. D.
1972-01-01
An advanced wiring system is described which achieves the safety/reliability required for present and future airplane and space vehicle applications. Also, present wiring installation techniques and hardware are analyzed to establish existing problem areas. An advanced wiring system employing matrix interconnecting unit, plug to plug trunk bundles (FCC or ribbon cable) is outlined, and an installation study presented. A planned program to develop, lab test and flight test key features of these techniques and hardware as a part of the SST technology follow-on activities is discussed.
Technology That's Ready and Able to Inspect Those Cables
NASA Technical Reports Server (NTRS)
2005-01-01
Attempting to locate a malfunctioning wire in a complex bundle of wires or in a cable that is concealed behind a wall is as difficult as trying to find a needle in a haystack. The result of such an effort can also be costly, time-consuming, and frustrating, whether it is the tedious process of examining cable connections for the Space Shuttle or troubleshooting a cable television hookup. Furthermore, other maintenance restrictions can compound the effort required to locate and repair a particular wiring problem. For example, on the Space Shuttle, once a repair is completed, all systems that have a wire passing through any of the connectors that were disconnected during troubleshooting are affected and, therefore, must undergo retesting, an arduous task that is completely unrelated to the original problem. In an effort to streamline wire inspection and maintenance, two contractors supporting NASA's Kennedy Space Center invented the Standing Wave Reflectometer (SWR) in 1999. In doing so, they leveraged technology that was first developed to detect problems that could lead to aircraft accidents, such as the one that resulted in the catastrophic failure of TWA flight 800 in 1996. The SWR performs a non-intrusive inspection that verifies the condition of electrical power and signal-distribution systems inside the Space Shuttle orbiters. Such testing reduces processing delays and ensures safe operation of these systems.
Detectors Ensure Function, Safety of Aircraft Wiring
NASA Technical Reports Server (NTRS)
2013-01-01
Pedro Medelius waited patiently in his lab at Kennedy Space Center. He had just received word that a colleague was bringing over a cable from a Space Shuttle solid rocket booster to test Medelius new invention. Medelius was calm until his colleague arrived, with about 30 other people. "Talk about testing under pressure," says Medelius. "There were people there from the Navy, the Air Force, and the Federal Aviation Administration." After the group s arrival, Medelius took a deep breath and connected his Standing Wave Reflectometer (SWR) to the cable. He wiggled the cable around, and the display showed a fault (a short or open circuit in wire) about an inch and a half inside the connector on the cable. His colleague questioned the results, because he had already checked that area on the cable. Medelius used the SWR to check again but got the same result. "That is when we took the cable apart and looked inside," Medelius says. "Lo and behold, that was exactly where the fault was." The impetus for Medelius new wire inspection technology came about in 1999 when one of the space shuttles lost power due to a fault somewhere in its more than 200 miles of electrical wiring. "The backup circuit was activated and prevented a major dysfunction, but nevertheless, there was a problem with the wiring," Medelius describes. Even though technicians used a device called a multimeter to measure the electrical current to find which wire had a fault, it could not pinpoint exactly where on the wire the fault was located. For that, technicians had to visually inspect the wire. "Sometimes they would have to remove the whole wire assembly and visually inspect every single wire. It was a very tedious operation because the wires are behind cabinets. They go all over the place in the shuttle," says Medelius. "NASA needed an instrument capable of telling them exactly where the faults were occurring." To meet NASA s needs for a highly precise device to inspect electrical power bundles, wires, and connectors, Medelius devised the SWR. "It came down to what was affected when a wire is short circuited or opened," he says. "We worked out a few equations based on physical principles." The SWR proved very sensitive, and the technology was patented.
NASA Technical Reports Server (NTRS)
Hang, Richard
2015-01-01
The presentation will overview NASA Armstrong Flight Research Centers flight test capabilities, which can provide various means for flight testing of passive and active wireless sensor systems, also, it will address the needs of the wireless data acquisition solutions for the centers flight instrumentation issues such as additional weight caused by added instrumentation wire bundles, connectors, wire cables routing, moving components, etc., that the Passive Wireless Sensor Technology Workshop may help. The presentation shows the constraints and requirements that the wireless sensor systems will face in the flight test applications.
NASA Astrophysics Data System (ADS)
Andrawis, Alfred S.
1994-10-01
The problem addressed by this report is the large size and heavy weight of the cable bundle, used for controlling a Multidegree-Of-Freedom Serpentine Truss Manipulator arm, which imposes limitations on the manipulator arm maneuverability. This report covers a design of an optical fiber network to replace the existing copper wire network of the Serpentine Truss Manipulator. This report proposes a fiber network design which significantly reduces the bundle size into two phases. The first phase does not require any modifications for the manipulator architecture, while the other requires major modifications. Design philosophy, hardware details and schematic diagrams are presented.
NASA Technical Reports Server (NTRS)
Andrawis, Alfred S.
1994-01-01
The problem addressed by this report is the large size and heavy weight of the cable bundle, used for controlling a Multidegree-Of-Freedom Serpentine Truss Manipulator arm, which imposes limitations on the manipulator arm maneuverability. This report covers a design of an optical fiber network to replace the existing copper wire network of the Serpentine Truss Manipulator. This report proposes a fiber network design which significantly reduces the bundle size into two phases. The first phase does not require any modifications for the manipulator architecture, while the other requires major modifications. Design philosophy, hardware details and schematic diagrams are presented.
47 CFR 76.802 - Disposition of cable home wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Disposition of cable home wiring. 76.802... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring... cable operator shall not remove the cable home wiring unless it gives the subscriber the opportunity to...
47 CFR 76.802 - Disposition of cable home wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Disposition of cable home wiring. 76.802... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring... cable operator shall not remove the cable home wiring unless it gives the subscriber the opportunity to...
47 CFR 76.802 - Disposition of cable home wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Disposition of cable home wiring. 76.802... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring... cable operator shall not remove the cable home wiring unless it gives the subscriber the opportunity to...
47 CFR 76.802 - Disposition of cable home wiring.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Disposition of cable home wiring. 76.802... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring... cable operator shall not remove the cable home wiring unless it gives the subscriber the opportunity to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cable and wire facilities expenses-Account 6410... Operating Expenses and Taxes Cable and Wire Facilities Expenses § 36.341 Cable and wire facilities expenses... network cable, aerial wire, and conduit systems. (b) The general method of separating cable and wire...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Cable and wire facilities expenses-Account 6410... Operating Expenses and Taxes Cable and Wire Facilities Expenses § 36.341 Cable and wire facilities expenses... network cable, aerial wire, and conduit systems. (b) The general method of separating cable and wire...
47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to... cable and intrabuilding network cable. Where an entire cable or aerial wire is assignable to one...
47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to... cable and intrabuilding network cable. Where an entire cable or aerial wire is assignable to one...
Heat Transfer Analysis in Wire Bundles for Aerospace Vehicles
NASA Technical Reports Server (NTRS)
Rickman, S. L.; Iamello, C. J.
2016-01-01
Design of wiring for aerospace vehicles relies on an understanding of "ampacity" which refers to the current carrying capacity of wires, either, individually or in wire bundles. Designers rely on standards to derate allowable current flow to prevent exceedance of wire temperature limits due to resistive heat dissipation within the wires or wire bundles. These standards often add considerable margin and are based on empirical data. Commercial providers are taking an aggressive approach to wire sizing which challenges the conventional wisdom of the established standards. Thermal modelling of wire bundles may offer significant mass reduction in a system if the technique can be generalized to produce reliable temperature predictions for arbitrary bundle configurations. Thermal analysis has been applied to the problem of wire bundles wherein any or all of the wires within the bundle may carry current. Wire bundles present analytical challenges because the heat transfer path from conductors internal to the bundle is tortuous, relying on internal radiation and thermal interface conductance to move the heat from within the bundle to the external jacket where it can be carried away by convective and radiative heat transfer. The problem is further complicated by the dependence of wire electrical resistivity on temperature. Reduced heat transfer out of the bundle leads to higher conductor temperatures and, hence, increased resistive heat dissipation. Development of a generalized wire bundle thermal model is presented and compared with test data. The steady state heat balance for a single wire is derived and extended to the bundle configuration. The generalized model includes the effects of temperature varying resistance, internal radiation and thermal interface conductance, external radiation and temperature varying convective relief from the free surface. The sensitivity of the response to uncertainties in key model parameters is explored using Monte Carlo analysis.
47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...
47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...
47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...
Parsons, J R; Chokshi, B V; Lee, C K; Gundlapalli, R V; Stamer, D
1997-02-01
Data was gathered from biomechanical testing of 10 thoracic human cadaveric spines. Spines were tested intact and with a Luque rectangle fixed with wire or cable. To compare the rigidity of fixation and intraspinal penetration of sublaminar monofilament wire and multistrand cable under identical conditions using human cadaveric spines. Reports of neurologic and mechanical complications associated with sublaminar wiring techniques have led to the recent development of more flexible multistrand cable systems. The relative performance of flexible cable versus monofilament wire has not been explored fully in a controlled mechanical environment. A servohydraulic mechanical testing machine was used to measure the static mechanical stiffness of sublaminar wire or cable fixation in conjunction with a Luque rectangle for thoracic human cadaveric spine segments in flexion-extension and torsion modes. Cyclic testing was performed in the flexion-extension mode. Intraspinal penetration of wires and cables was measured. Spine fixation with sublaminar wire and cable resulted in constructs of equal stiffness in flexion-extension and torsion modes. Cyclic testing also indicated similar fatigue profiles for wire- and cable-instrumented spines. Wire and cable fixed spines displayed greater stiffness than the intact spines. Cable encroachment of the spinal canal was less than that seen with wire. Sublaminar multistrand cable may be a rational alternative to monofilament wire in segmental spinal instrumentation because it provides less encroachment into the spinal canal. Further, cadaveric spines instrumented with wire and cable display equivalent mechanical behavior, statically and under cyclic loading. The potential advantages of cable, however, must be balanced against a substantial increase in cost relative to wire.
30 CFR 75.517 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...
30 CFR 75.517 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...
30 CFR 75.517 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...
30 CFR 75.517 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...
30 CFR 75.517 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...
NASA Astrophysics Data System (ADS)
Torres, V.; Quek, S.; Gaydecki, P.
2010-02-01
Aging and deterioration of the main functional parts in civil structures is one of the biggest problems that private and governmental institutions, dedicated to operate and maintain such structures, are facing now days. In the case of relatively old suspension bridges, problems emerge due to corrosion and break of wires in the main cables. Decisive information and a reliable monitoring and evaluation are factors of great relevance required to prevent significant or catastrophic damages caused to the structure, and more importantly, to people. The main challenge for the NDE methods of inspection arises in dealing with the steel wrapping barrier of the suspension cable, which main function is to shield, shape and hold the bundles. The following work, presents a study of a multi-Magnetoresistive sensors system aiming to support the monitoring and evaluation of suspension cables at some of its stages. Modelling, signal acquisition, signal processing, experiments and the initial phases of implementation are presented and discussed widely.
47 CFR 76.802 - Disposition of cable home wiring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring... alternative video programming service provider connects its wiring to the home wiring before the incumbent... alternative video programming service provider shall be responsible for ensuring that the incumbent's wiring...
47 CFR 36.154 - Exchange Line Cable and Wire Facilities (C&WF)-Category 1-apportionment procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Exchange Line Cable and Wire Facilities (C&WF... COMPANIES 1 Telecommunications Property Cable and Wire Facilities § 36.154 Exchange Line Cable and Wire... apportioning the cost of exchange line cable and wire facilities among the operations is the determination of...
47 CFR 36.154 - Exchange Line Cable and Wire Facilities (C&WF)-Category 1-apportionment procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Exchange Line Cable and Wire Facilities (C&WF... COMPANIES 1 Telecommunications Property Cable and Wire Facilities § 36.154 Exchange Line Cable and Wire... apportioning the cost of exchange line cable and wire facilities among the operations is the determination of...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation are...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables, except wires connected directly to track rails, shall be tested when wires, cables, and insulation are...
49 CFR 236.71 - Signal wires on pole line and aerial cable.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Signal wires on pole line and aerial cable. 236.71... Instructions: All Systems Wires and Cables § 236.71 Signal wires on pole line and aerial cable. Signal wire on... pole or other support. Signal wire shall not interfere with, or be interfered by, other wires on the...
49 CFR 236.71 - Signal wires on pole line and aerial cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Signal wires on pole line and aerial cable. 236.71... Instructions: All Systems Wires and Cables § 236.71 Signal wires on pole line and aerial cable. Signal wire on... pole or other support. Signal wire shall not interfere with, or be interfered by, other wires on the...
47 CFR 36.152 - Categories of Cable and Wire Facilities (C&WF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Categories of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.152 Categories of Cable and Wire Facilities (C&WF). (a) C... exchange cable and wire facilites among the operations are set forth in §§ 36.154 and 36.155. (b...
47 CFR 36.152 - Categories of Cable and Wire Facilities (C&WF).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Categories of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.152 Categories of Cable and Wire Facilities (C&WF). (a) C... exchange cable and wire facilites among the operations are set forth in §§ 36.154 and 36.155. (b...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...
ERIC Educational Resources Information Center
Picard, Robert G.
Bundling, a practice which has increased dramatically in the television and cable industries in recent years, occurs when program distributors package groups of movies and episodes of series, and then sell licenses to use these packages to TV stations and cable channels. Typically, such bundled packages include both highly desirable and less…
NEMA wire and cable standards development programs
NASA Astrophysics Data System (ADS)
Baird, Robert W.
1994-01-01
The National Electrical Manufacturers Association (NEMA) is the nation's largest trade association for manufacturers of electrical equipment. Its member companies produce components, end-use equipment and systems for the generation, transmission, distribution, control and use of electricity. The wire and cable division is presented in 6 sections: building wire and cable, fabricated conductors, flexible cords, high performance wire and cable, magnet wire, and power and control cable. Participating companies are listed.
47 CFR 76.806 - Pre-termination access to cable home wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Pre-termination access to cable home wiring. 76... access to cable home wiring. (a) Prior to termination of service, a customer may: install or provide for the installation of their own cable home wiring; or connect additional home wiring, splitters or other...
47 CFR 76.806 - Pre-termination access to cable home wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Pre-termination access to cable home wiring. 76... access to cable home wiring. (a) Prior to termination of service, a customer may: install or provide for the installation of their own cable home wiring; or connect additional home wiring, splitters or other...
47 CFR 76.806 - Pre-termination access to cable home wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Pre-termination access to cable home wiring. 76... access to cable home wiring. (a) Prior to termination of service, a customer may: install or provide for the installation of their own cable home wiring; or connect additional home wiring, splitters or other...
30 CFR 56.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... insulated wires, other than cables, pass through metal frames, the holes shall be substantially bushed with...
30 CFR 56.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... insulated wires, other than cables, pass through metal frames, the holes shall be substantially bushed with...
49 CFR 236.71 - Signal wires on pole line and aerial cable.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Signal wires on pole line and aerial cable. 236.71..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.71 Signal wires on pole line and aerial cable. Signal wire on...
49 CFR 236.71 - Signal wires on pole line and aerial cable.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Signal wires on pole line and aerial cable. 236.71..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.71 Signal wires on pole line and aerial cable. Signal wire on...
49 CFR 236.71 - Signal wires on pole line and aerial cable.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Signal wires on pole line and aerial cable. 236.71..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.71 Signal wires on pole line and aerial cable. Signal wire on...
30 CFR 75.516-2 - Communication wires and cables; installation; insulation; support.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Communication wires and cables; installation... Equipment-General § 75.516-2 Communication wires and cables; installation; insulation; support. (a) All communication wires shall be supported on insulated hangers or insulated J-hooks. (b) All communication cables...
30 CFR 75.516-2 - Communication wires and cables; installation; insulation; support.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Communication wires and cables; installation... Equipment-General § 75.516-2 Communication wires and cables; installation; insulation; support. (a) All communication wires shall be supported on insulated hangers or insulated J-hooks. (b) All communication cables...
30 CFR 75.516-2 - Communication wires and cables; installation; insulation; support.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Communication wires and cables; installation... Equipment-General § 75.516-2 Communication wires and cables; installation; insulation; support. (a) All communication wires shall be supported on insulated hangers or insulated J-hooks. (b) All communication cables...
30 CFR 75.516-2 - Communication wires and cables; installation; insulation; support.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Communication wires and cables; installation... Equipment-General § 75.516-2 Communication wires and cables; installation; insulation; support. (a) All communication wires shall be supported on insulated hangers or insulated J-hooks. (b) All communication cables...
30 CFR 75.516-2 - Communication wires and cables; installation; insulation; support.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Communication wires and cables; installation... Equipment-General § 75.516-2 Communication wires and cables; installation; insulation; support. (a) All communication wires shall be supported on insulated hangers or insulated J-hooks. (b) All communication cables...
The use of sublaminar cables to replace Luque wires.
Songer, M N; Spencer, D L; Meyer, P R; Jayaraman, G
1991-08-01
Sublaminar wires have been used in conjunction with posterior instrumentation to stabilize the spine. Sublaminar wiring has fallen into disfavor because of an increase in neurologic complications with the Luque technique as well as wire breakage, dural tears, and difficulty of removal. A cable system consisting of two 49-stranded stainless steel cables connected to one malleable leader was designed to overcome these shortcomings. Biomechanical testing revealed that the maximum yield strength of a single stainless steel cable loop was 2.85-2.94 times greater than a double 0.05-in. stainless steel wire loop. The fatigue tests demonstrated that the stainless steel cables required 6-22 times more cycles to failure than the stainless steel wire. Many of the titanium cables failed immediately under higher loads (0-100 lb) because of slipping of the crimp. The preliminary clinical results after a mean of 19 months of follow-up of 245 cables are encouraging. There has been no breakage or loosening of the cables and no complications associated with the use of the cables. The stainless steel cables are very strong, but more important, the cable flexibility prevents repeated contusions to the spinal cord during insertion of the rods and tightening of wires. The cable conforms to the undersurface of the lamina. This may lead to a decrease in neurologic complications.
47 CFR 36.152 - Categories of Cable and Wire Facilities (C&WF).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Categories of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.152 Categories of Cable and Wire Facilities (C&WF). (a) C... channels, and for circuits between control terminals and radio stations providing very high frequency...
47 CFR 36.152 - Categories of Cable and Wire Facilities (C&WF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Categories of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.152 Categories of Cable and Wire Facilities (C&WF). (a) C... channels, and for circuits between control terminals and radio stations providing very high frequency...
47 CFR 36.152 - Categories of Cable and Wire Facilities (C&WF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Categories of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.152 Categories of Cable and Wire Facilities (C&WF). (a) C... channels, and for circuits between control terminals and radio stations providing very high frequency...
30 CFR 56.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...
30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...
30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...
30 CFR 56.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
30 CFR 56.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
14 CFR Appendix F to Part 23 - Test Procedure
Code of Federal Regulations, 2011 CFR
2011-01-01
... materials used in electrical wire and cable insulation and in small parts, materials must be tested either... wire and cable insulation, the wire and cable specimens must be the same size as used in the airplane... specification (make and size) must be tested. The specimen of wire or cable (including insulation) must be...
47 CFR 32.2410 - Cable and wire facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts 2411...
47 CFR 32.2410 - Cable and wire facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Cable and wire facilities. 32.2410 Section 32... Cable and wire facilities. This account shall be used by Class B companies to record the original cost of cable and wire facilities of the type and character required of Class A companies in Accounts 2411...
30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...
30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...
Wire in the Cable-Driven System of Surgical Robot
NASA Astrophysics Data System (ADS)
Wang, X. F.; Lv, N.; Mu, H. Z.; Xue, L. J.
2017-07-01
During the evolution of the surgical robot, cable plays an important role. It translates motion and force precisely from surgeon’s hand to the tool’s tips. In the paper, the vertical wires, the composition of cable, are mathematically modeled from a geometric point of view. The cable structure and tension are analyzed according to the characteristics of wire screw twist. The structural equations of the wires in different positions are derived for both non-bent cable and bent cable, respectively. The bending moment formula of bent cable is also obtained. This will help researchers find suitable cable and design more matched pulley.
30 CFR 75.517-1 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...
30 CFR 75.517-1 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...
30 CFR 75.517-1 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...
30 CFR 75.517-1 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Host/remote message Cable and Wire Facilities... TELECOMMUNICATIONS COMPANIES 1 Telecommunications Property Cable and Wire Facilities § 36.157 Host/remote message Cable and Wire Facilities (C&WF)—Category 4—apportionment procedures. (a) Host/Remote Message C&WF...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Host/remote message Cable and Wire Facilities... TELECOMMUNICATIONS COMPANIES 1 Telecommunications Property Cable and Wire Facilities § 36.157 Host/remote message Cable and Wire Facilities (C&WF)—Category 4—apportionment procedures. (a) Host/Remote Message C&WF...
30 CFR 75.517-1 - Power wires and cables; insulation and protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...
Square-lashing technique in segmental spinal instrumentation: a biomechanical study.
Arlet, Vincent; Draxinger, Kevin; Beckman, Lorne; Steffen, Thomas
2006-07-01
Sublaminar wires have been used for many years for segmental spinal instrumentation in scoliosis surgery. More recently, stainless steel wires have been replaced by titanium cables. However, in rigid scoliotic curves, sublaminar wires or simple cables can either brake or pull out. The square-lashing technique was devised to avoid complications such as cable breakage or lamina cutout. The purpose of the study was therefore to test biomechanically the pull out and failure mode of simple sublaminar constructs versus the square-lashing technique. Individual vertebrae were subjected to pullout testing having one of two different constructs (single loop and square lashing) using either monofilament wire or multifilament cables. Four different methods of fixation were therefore tested: single wire construct, square-lashing wiring construct, single cable construct, and square-lashing cable construct. Ultimate failure load and failure mechanism were recorded. For the single wire the construct failed 12/16 times by wire breakage with an average ultimate failure load of 793 N. For the square-lashing wire the construct failed with pedicle fracture in 14/16, one bilateral lamina fracture, and one wire breakage. Ultimate failure load average was 1,239 N For the single cable the construct failed 12/16 times due to cable breakage (average force 1,162 N). 10/12 of these breakages were where the cable looped over the rod. For the square-lashing cable all of these constructs (16/16) failed by fracture of the pedicle with an average ultimate failure load of 1,388 N. The square-lashing construct had a higher pullout strength than the single loop and almost no cutting out from the lamina. The square-lashing technique with cables may therefore represent a new advance in segmental spinal instrumentation.
30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...
30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...
30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...
30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.
Code of Federal Regulations, 2010 CFR
2010-07-01
... wires and cables. 75.517-2 Section 75.517-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to...
30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.
Code of Federal Regulations, 2011 CFR
2011-07-01
... wires and cables. 75.517-2 Section 75.517-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to...
49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Insulation resistance tests, wires in trunking and... resistance tests, wires in trunking and cables. (a) Insulation resistance tests shall be made when wires or... between conductors in trunking. Insulation resistance tests shall be performed when wires, cables, and...
49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Insulation resistance tests, wires in trunking and... resistance tests, wires in trunking and cables. (a) Insulation resistance tests shall be made when wires or... between conductors in trunking. Insulation resistance tests shall be performed when wires, cables, and...
Improvements to Wire Bundle Thermal Modeling for Ampacity Determination
NASA Technical Reports Server (NTRS)
Rickman, Steve L.; Iannello, Christopher J.; Shariff, Khadijah
2017-01-01
Determining current carrying capacity (ampacity) of wire bundles in aerospace vehicles is critical not only to safety but also to efficient design. Published standards provide guidance on determining wire bundle ampacity but offer little flexibility for configurations where wire bundles of mixed gauges and currents are employed with varying external insulation jacket surface properties. Thermal modeling has been employed in an attempt to develop techniques to assist in ampacity determination for these complex configurations. Previous developments allowed analysis of wire bundle configurations but was constrained to configurations comprised of less than 50 elements. Additionally, for vacuum analyses, configurations with very low emittance external jackets suffered from numerical instability in the solution. A new thermal modeler is presented allowing for larger configurations and is not constrained for low bundle infrared emissivity calculations. Formulation of key internal radiation and interface conductance parameters is discussed including the effects of temperature and air pressure on wire to wire thermal conductance. Test cases comparing model-predicted ampacity and that calculated from standards documents are presented.
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
47 CFR 76.806 - Pre-termination access to cable home wiring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Pre-termination access to cable home wiring. 76.806 Section 76.806 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.806 Pre-termination...
49 CFR 234.243 - Wire on pole line and aerial cable.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Wire on pole line and aerial cable. 234.243... Maintenance, Inspection, and Testing Maintenance Standards § 234.243 Wire on pole line and aerial cable. Wire... bracket supported by a pole or other support. Wire shall not interfere with, or be interfered with by...
49 CFR 234.243 - Wire on pole line and aerial cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Wire on pole line and aerial cable. 234.243... Maintenance, Inspection, and Testing Maintenance Standards § 234.243 Wire on pole line and aerial cable. Wire... bracket supported by a pole or other support. Wire shall not interfere with, or be interfered with by...
46 CFR 129.340 - Cable and wiring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cable and wiring. 129.340 Section 129.340 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than...
Reducing Magnetic Fields Around Power Cables
NASA Technical Reports Server (NTRS)
Sargent, Noel B.; Gitelman, Florida; Pongracz-Bartha, Edward; Spalding, John
1993-01-01
Four power conductors arranged symmetrically about fifth grounded conductor. Four current-carrying wires arranged symmetrically around central grounded wire that nominally carries no current. In comparison with other cable configurations, this one results in smaller magnetic fields around cable. Technique for use when size of wires in cable makes twisting impractical.
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire must be in conduit. (b) All cable and wire must: (1) Have stranded copper conductors with sufficient... constant representing the resistance of copper). I=Load current, in amperes. L=length of conductor from...
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire must be in conduit. (b) All cable and wire must: (1) Have stranded copper conductors with sufficient... constant representing the resistance of copper). I=Load current, in amperes. L=length of conductor from...
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire must be in conduit. (b) All cable and wire must: (1) Have stranded copper conductors with sufficient... constant representing the resistance of copper). I=Load current, in amperes. L=length of conductor from...
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire must be in conduit. (b) All cable and wire must: (1) Have stranded copper conductors with sufficient... constant representing the resistance of copper). I=Load current, in amperes. L=length of conductor from...
Method of fabricating high-density hermetic electrical feedthroughs using insulated wire bundles
Shah, Kedar G.; Benett, William J.; Pannu, Satinderpall S.
2016-05-10
A method of fabricating electrical feedthroughs coats of a plurality of electrically conductive wires with an electrically insulating material and bundles the coated wires together in a substantially parallel arrangement. The bundled coated wires are secured to each other by joining the electrically insulating material of adjacent wires together to form a monolithic block which is then cut transverse to the wires to produce a block section having opposing first and second sides with a plurality of electrically conductive feedthroughs extending between them.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...
A wireless multi-channel recording system for freely behaving mice and rats.
Fan, David; Rich, Dylan; Holtzman, Tahl; Ruther, Patrick; Dalley, Jeffrey W; Lopez, Alberto; Rossi, Mark A; Barter, Joseph W; Salas-Meza, Daniel; Herwik, Stanislav; Holzhammer, Tobias; Morizio, James; Yin, Henry H
2011-01-01
To understand the neural basis of behavior, it is necessary to record brain activity in freely moving animals. Advances in implantable multi-electrode array technology have enabled researchers to record the activity of neuronal ensembles from multiple brain regions. The full potential of this approach is currently limited by reliance on cable tethers, with bundles of wires connecting the implanted electrodes to the data acquisition system while impeding the natural behavior of the animal. To overcome these limitations, here we introduce a multi-channel wireless headstage system designed for small animals such as rats and mice. A variety of single unit and local field potential signals were recorded from the dorsal striatum and substantia nigra in mice and the ventral striatum and prefrontal cortex simultaneously in rats. This wireless system could be interfaced with commercially available data acquisition systems, and the signals obtained were comparable in quality to those acquired using cable tethers. On account of its small size, light weight, and rechargeable battery, this wireless headstage system is suitable for studying the neural basis of natural behavior, eliminating the need for wires, commutators, and other limitations associated with traditional tethered recording systems.
A Wireless Multi-Channel Recording System for Freely Behaving Mice and Rats
Holtzman, Tahl; Ruther, Patrick; Dalley, Jeffrey W.; Lopez, Alberto; Rossi, Mark A.; Barter, Joseph W.; Salas-Meza, Daniel; Herwik, Stanislav; Holzhammer, Tobias; Morizio, James; Yin, Henry H.
2011-01-01
To understand the neural basis of behavior, it is necessary to record brain activity in freely moving animals. Advances in implantable multi-electrode array technology have enabled researchers to record the activity of neuronal ensembles from multiple brain regions. The full potential of this approach is currently limited by reliance on cable tethers, with bundles of wires connecting the implanted electrodes to the data acquisition system while impeding the natural behavior of the animal. To overcome these limitations, here we introduce a multi-channel wireless headstage system designed for small animals such as rats and mice. A variety of single unit and local field potential signals were recorded from the dorsal striatum and substantia nigra in mice and the ventral striatum and prefrontal cortex simultaneously in rats. This wireless system could be interfaced with commercially available data acquisition systems, and the signals obtained were comparable in quality to those acquired using cable tethers. On account of its small size, light weight, and rechargeable battery, this wireless headstage system is suitable for studying the neural basis of natural behavior, eliminating the need for wires, commutators, and other limitations associated with traditional tethered recording systems. PMID:21765934
30 CFR 57.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2014 CFR
2014-07-01
... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
30 CFR 57.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2013 CFR
2013-07-01
... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
30 CFR 57.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2012 CFR
2012-07-01
... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...
30 CFR 57.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires and cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical...
30 CFR 57.12008 - Insulation and fittings for power wires and cables.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires and cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical...
Modeling of Electrical Cable Failure in a Dynamic Assessment of Fire Risk
NASA Astrophysics Data System (ADS)
Bucknor, Matthew D.
Fires at a nuclear power plant are a safety concern because of their potential to defeat the redundant safety features that provide a high level of assurance of the ability to safely shutdown the plant. One of the added complexities of providing protection against fires is the need to determine the likelihood of electrical cable failure which can lead to the loss of the ability to control or spurious actuation of equipment that is required for safe shutdown. A number of plants are now transitioning from their deterministic fire protection programs to a risk-informed, performance based fire protection program according to the requirements of National Fire Protection Association (NFPA) 805. Within a risk-informed framework, credit can be taken for the analysis of fire progression within a fire zone that was not permissible within the deterministic framework of a 10 CFR 50.48 Appendix R safe shutdown analysis. To perform the analyses required for the transition, plants need to be able to demonstrate with some level of assurance that cables related to safe shutdown equipment will not be compromised during postulated fire scenarios. This research contains the development of new cable failure models that have the potential to more accurately predict electrical cable failure in common cable bundle configurations. Methods to determine the thermal properties of the new models from empirical data are presented along with comparisons between the new models and existing techniques used in the nuclear industry today. A Dynamic Event Tree (DET) methodology is also presented which allows for the proper treatment of uncertainties associated with fire brigade intervention and its effects on cable failure analysis. Finally a shielding analysis is performed to determine the effects on the temperature response of a cable bundle that is shielded from a fire source by an intervening object such as another cable tray. The results from the analyses demonstrate that models of similar complexity to existing cable failure techniques and tuned to empirical data can better approximate the temperature response of a cables located in tightly packed cable bundles. The new models also provide a way to determine the conditions insides a cable bundle which allows for separate treatment of cables on the interior of the bundle from cables on the exterior of the bundle. The results from the DET analysis show that the overall assessed probability of cable failure can be significantly reduced by more realistically accounting for the influence that the fire brigade has on a fire progression scenario. The shielding analysis results demonstrate a significant reduction in the temperature response of a shielded versus a non-shielded cable bundle; however the computational cost of using a fire progression model that can capture these effects may be prohibitive for performing DET analyses with currently available computational fluid dynamics models and computational resources.
Biomechanical comparison of fixation methods in transverse patella fractures.
Scilaris, T A; Grantham, J L; Prayson, M J; Marshall, M P; Hamilton, J J; Williams, J L
1998-01-01
To compare monofilament wire versus braided cable for stabilizing transverse patella fractures using the modified AO tension band technique. A randomized blocked (paired) study comparing two fixation methods. Statistical analysis was performed using a nested repeated measures analysis, followed by Bonferroni post hoc testing. Seven paired embalmed knees (mean age 71.8 years, SD 14.6 years) were dissected, and transverse fractures were simulated. The knees were reduced and randomly fixed by either two parallel 0.062-inch Kirschner wires with a 1.0-millimeter-diameter 316L stainless steel monofilament wire tension loop or two Kirschner wires with a 1.0-millimeter-diameter 316L stainless steel braided cable tension loop. Knees were tested by applying a cyclic load through the suprapatellar tendon between twenty and 300 newtons for thirty cycles. The maximum fracture displacement increased with each cycle of loading for both the braided cable and monofilament wire tension loop configurations (p = 0.0001). The average peak displacement at the thirtieth cycle was 2.25 millimeters for monofilament wire and 0.73 millimeters for the cable. When comparing both methods for all cycles, the braided cable allowed less fracture displacement than did the monofilament wire (p = 0.002), and the rate of increase per cycle of maximum fracture displacement was less for the cable than for the wire (p = 0.0001). In transverse, noncomminuted patella fractures, fixation with two Kirschner wires and a 1.0-millimeter braided cable tension loop was superior to the monofilament wire tension loop. Most importantly, the braided cable afforded more predictable results during cyclic loading.
Shen, Tengming
2016-11-15
A method, system, and apparatus for fabricating a high-strength Superconducting cable comprises pre-oxidizing at least one high-strength alloy wire, coating at least one Superconducting wire with a protective layer, and winding the high-strength alloy wire and the Superconducting wire to form a high-strength Superconducting cable.
Shen, Tengming
2018-01-02
A method, system, and apparatus for fabricating a high-strength Superconducting cable comprises pre-oxidizing at least one high-strength alloy wire, coating at least one Superconducting wire with a protective layer, and winding the high-strength alloy wire and the Superconducting wire to form a high-strength Superconducting cable.
Miniature, shielded electrical connector with strain relief
NASA Technical Reports Server (NTRS)
Diep, Chuong H. (Inventor)
2006-01-01
An electrical connector assembly includes a wire bundle having at least one wire with a metal shield surrounding at least a portion of the wire. The shield has an end portion and provides electromagnetic interference protection to the wire. A backshell includes a body and a cover secured to the body together defining an internal cavity with the wire at least partially arranged within the cavity. The backshell provides EMI protection for the portion of the wire bundle not covered by the shield. The backshell includes a hole in a wall of either the body or the cover with the end portion of the shield extending through the hole. The clamp is secured about the body and the cover with the end portion of the shield arranged between the clamp and the backshell grounding the shield to the backshell. The clamp forces the backshell into engagement with the wire bundle to provide strain relief for the wire bundle.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...
A retracting wire knife for cutting fiber bundles and making sheet lesions of brain tissue.
Shibata, M; Russell, I S
1979-07-01
A retracting knife which has two cutting wires for the transection of fiber bundles is described. The knife holds the fiber bundles of the stria terminalis between the two cutting wires and transects them by a shearing movement as the wires close. In addition, the feasability of such a knife producing a sheet lesion around the n. caudatus is also described.
Powell, J. G.
1991-01-01
A nuclear qualified in-containment electrical connection comprises an insulated, sheathed instrument lead having electrical conductors extending from one end thereof to provide two exposed lead wires, a watertight cable having electrical conducting wires therein and extending from one end of the cable to provide two lead wires therefrom, two butt splice connectors each connecting the ends of respective ones of the lead wires from the instrument lead and cable, a length of heat shrinkable plastic tubing positioned over each butt splice connector and an adjacent portion of a respective lead wire from the cable and heat shrunk into position, a length of heat shrinkable plastic tubing on the end portion of the instrument lead adjacent the lead wires therefrom and heat shrunk thereon and a length of outer heat shrinkable plastic tubing extending over the end portion of the instrument lead and the heat shrinkable tubing thereon and over the butt splice connectors and a portion of the cable adjacent the cable lead lines, the outer heat shrinkable tubing being heat shrunk into sealing position on the instrument lead and cable.
NASA Astrophysics Data System (ADS)
Hartley, M. D.; Jaques, R. E.
1986-11-01
The Canadian Electrical Code and the National Building Code in Canada recognize only two designations in regards to fire resistance of cables; cables for use in combustible (residential) buildings and cables for use in non-combustible buildings. The Test standard for cables for non-combustible buildings resembles IEEE-383. However, it is more severe; particularly for small nonarmoured cables such as Inside Wiring Cable. This forthcoming requirement has necessitated material and product development. Although an Inside Wiring cable modification of both insulation and jacket was undertaken, the large volume fraction of combustible material in the jacket vis a vis the insulation made it the area of greatest impact. The paper outlines the development and its effect on cable performance.
47 CFR 32.6410 - Cable and wire facilities expenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses of...
47 CFR 32.6410 - Cable and wire facilities expenses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Cable and wire facilities expenses. 32.6410 Section 32.6410 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... Cable and wire facilities expenses. Class B telephone companies shall use this account for expenses of...
Cable Crosstalk Suppression with Two-Wire Voltage Feedback Method for Resistive Sensor Array
Wu, Jianfeng; He, Shangshang; Li, Jianqing; Song, Aiguo
2016-01-01
Using a long, flexible test cable connected with a one-wire voltage feedback circuit, a resistive tactile sensor in a shared row-column fashion exhibited flexibility in robotic operations but suffered from crosstalk caused by the connected cable due to its wire resistances and its contacted resistances. Firstly, we designed a new non-scanned driving-electrode (VF-NSDE) circuit using two wires for every row line and every column line to reduce the crosstalk caused by the connected cables in the circuit. Then, an equivalent resistance expression of the element being tested (EBT) for the two-wire VF-NSDE circuit was analytically derived. Following this, the one-wire VF-NSDE circuit and the two-wire VF-NSDE circuit were evaluated by simulation experiments. Finally, positive features of the proposed method were verified with the experiments of a two-wire VF-NSDE prototype circuit. The experiment results show that the two-wire VF-NSDE circuit can greatly reduce the crosstalk error caused by the cables in the 2-D networked resistive sensor array. PMID:26907279
75 FR 51701 - Airworthiness Directives; Learjet Inc. Model 45 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-23
... configuration of the engine and alternator wire harnesses, and the starter/generator wire bundles. For certain... necessary. For certain airplanes, inspecting for clearance between the wire harnesses and the hydraulic and... wire harnesses and the starter/generator wire bundles. (2) Do a detailed inspection for chafing damage...
NASA Technical Reports Server (NTRS)
Smith, Andrew M.; Davis, R. Benjamin; LaVerde, Bruce T.; Fulcher, Clay W.; Jones, Douglas C.; Waldon, James M.; Craigmyle, Benjamin B.
2012-01-01
This validation study examines the effect on vibroacoustic response resulting from the installation of cable bundles on a curved orthogrid panel. Of interest is the level of damping provided by the installation of the cable bundles and whether this damping could be potentially leveraged in launch vehicle design. The results of this test are compared with baseline acoustic response tests without cables. Damping estimates from the measured response data are made using a new software tool that leverages a finite element model of the panel in conjunction with advanced optimization techniques. While the full test series is not yet complete, the first configuration of cable bundles that was assessed effectively increased the viscous critical damping fraction of the system by as much as 0.02 in certain frequency ranges.
Electro-Optic Fabrics for the Warrior of the 21st Century - Phase II
2010-01-01
46 28. Effect of 1000 cycles of hex- abrasion testing on Fire Wire cable .................................... 46 UNCLASSIFIED vi 29. Close...49 32. Effect of 2000 cycles of hex- abrasion testing on Fire Wire cable .................................... 49 33. Effect of 4000 cycles of...hex- abrasion testing on Fire Wire cable .................................... 50 34. Effect of 2000 cycles of hex- abrasion testing on USB v2 cable
47 CFR 69.304 - Subscriber line cable and wire facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Subscriber line cable and wire facilities. 69.304 Section 69.304 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) ACCESS CHARGES Apportionment of Net Investment § 69.304 Subscriber line cable and wire...
47 CFR 69.305 - Carrier cable and wire facilities (C&WF).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Carrier cable and wire facilities (C&WF). 69.305 Section 69.305 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) ACCESS CHARGES Apportionment of Net Investment § 69.305 Carrier cable and wire...
47 CFR 69.304 - Subscriber line cable and wire facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Subscriber line cable and wire facilities. 69.304 Section 69.304 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) ACCESS CHARGES Apportionment of Net Investment § 69.304 Subscriber line cable and wire...
47 CFR 69.305 - Carrier cable and wire facilities (C&WF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Carrier cable and wire facilities (C&WF). 69.305 Section 69.305 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) ACCESS CHARGES Apportionment of Net Investment § 69.305 Carrier cable and wire...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
... the compliance times specified, unless already done. Installation of New Relay and Wiring Bundle (g... certain wiring changes, installing a new relay and necessary wiring in the cabin air conditioning and... for changing the wire bundle route and wiring, installing a new relay and applicable wiring in the...
Implementing the FDA performance standard on electrode lead wires and patient cables in hospitals.
Tsitlik, J E; Rose, D C; Baumann, R C
2000-01-01
The U.S. Food and Drug Administration (FDA) Performance Standard on Electrode Lead Wires and Patient Cables became mandatory for all relevant devices on May 9, 2000. The standard requires that any lead wire or patient cable that has contact, temporary or permanent, with a patient, should not allow the connection of the patient to the earth or possibly hazardous voltages. This article advises those hospitals and other healthcare facilities that have not completed the upgrades of wires and cables on how to complete this task.
Oh, You Na; Ha, Keong Jun; Kim, Joon Bum; Jung, Sung-Ho; Choo, Suk Jung; Chung, Cheol Hyun; Lee, Jae Won
2015-08-01
Stainless steel wiring remains the most popular technique for primary sternal closure. Recently, a multifilament cable wiring system (Pioneer Surgical Technology Inc., Marquette, MI, USA) was introduced for sternal closure and has gained wide acceptance due to its superior resistance to tension. We aimed to compare conventional steel wiring to multifilament cable fixation for sternal closure in patients undergoing major cardiac surgery. Data were collected retrospectively on 1,354 patients who underwent sternal closure after major cardiac surgery, using either the multifilament cable wiring system or conventional steel wires between January 2009 and October 2010. The surgical outcomes of these two groups of patients were compared using propensity score matching based on 18 baseline patient characteristics. Propensity score matching yielded 392 pairs of patients in the two groups whose baseline profiles showed no significant differences. No significant differences between the two groups were observed in the rates of early mortality (2.0% vs. 1.3%, p=0.578), major wound complications requiring reconstruction (1.3% vs. 1.3%, p>0.99), minor wound complications (3.6% vs. 2.0%, p=0.279), or mediastinitis (0.8% vs. 1.0%, p=1.00). Patients in the multifilament cable group had fewer sternal bleeding events than those in the conventional wire group, but this tendency was not statistically significant (4.3% vs. 7.4%, p=0.068). The surgical outcomes of sternal closure using multifilament cable wires were comparable to those observed when conventional steel wires were used. Therefore, the multifilament cable wiring system may be considered a viable option for sternal closure in patients undergoing major cardiac surgery.
Experimental characterization of shape memory alloy actuator cables
NASA Astrophysics Data System (ADS)
Biggs, Daniel B.; Shaw, John A.
2016-04-01
Wire rope (or cables) are a fundamental structural element in many engineering applications. Recently, there has been growing interest in stranding NiTi wires into cables to scale up the adaptive properties of NiTi tension elements and to make use of the desirable properties of wire rope. Exploratory experiments were performed to study the actuation behavior of two NiTi shape memory alloy cables and straight monofilament wire of the same material. The specimens were held under various dead loads ranging from 50 MPa to 400 MPa and thermally cycled 25 times from 140°C to 5°C at a rate of 12°C/min. Performance metrics of actuation stroke, residual strain, and work output were measured and compared between specimen types. The 7x7 cable exhibited similar actuation to the single straight wire, but with slightly longer stroke and marginally more shakedown, while maintaining equivalent specific work output. This leads to the conclusion that the 7x7 cable effectively scaled up the adaptive properties the straight wire. Under loads below 150 MPa, the 1x27 cable had up to double the actuation stroke and work output, but exhibited larger shakedown and poorer performance when loaded higher.
NASA Astrophysics Data System (ADS)
Powell, J. G.
1990-07-01
A nuclear qualified in-containment electrical connection is presented that comprises: (1) an insulated, sheathed instrument lead having electrical conductors extending from one end thereof to provide two exposed lead wires; (2) a watertight cable having electrical conducting wires therein and extending from one end of the cable to provide two lead wires therefrom; (3) two butt splice connectors each connecting the ends of respective ones of the lead wires from the instrument lead and cable; (4) a length of heat shrinkable plastic tubing positioned over each butt splice connector and an adjacent portion of a respective lead wire from the cable and heat shrunk into position; and (5) a length of heat shrinkable plastic tubing on the end portion of the instrument lead adjacent the lead wires therefrom, heat shrunk thereon, with a length of outer heat shrinkable plastic tubing. The plastic tubing extends over the end portion of the instrument lead and the heat shrinkable tubing and over the butt splice connectors and a portion of the cable adjacent the cable lead lines. The outer heat shrinkable tubing is heat shrunk into sealing position on the instrument lead and cable.
Design of power cable grounding wire anti-theft monitoring system
NASA Astrophysics Data System (ADS)
An, Xisheng; Lu, Peng; Wei, Niansheng; Hong, Gang
2018-01-01
In order to prevent the serious consequences of the power grid failure caused by the power cable grounding wire theft, this paper presents a GPRS based power cable grounding wire anti-theft monitoring device system, which includes a camera module, a sensor module, a micro processing system module, and a data monitoring center module, a mobile terminal module. Our design utilize two kinds of methods for detecting and reporting comprehensive image, it can effectively solve the problem of power and cable grounding wire box theft problem, timely follow-up grounded cable theft events, prevent the occurrence of electric field of high voltage transmission line fault, improve the reliability of the safe operation of power grid.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new... clearance and any wire bundle damage between wire bundle W443 and the left forward rudder quadrant, followed by adjusting the minimum clearance between the wire bundle and the left forward rudder quadrant, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
...: We propose to adopt a new airworthiness directive (AD) for certain Model 737-600, -700, -700C, -800... and any wire bundle damage between wire bundle W443 and the left forward rudder quadrant, followed by adjusting the minimum clearance between the wire bundle and the left forward rudder quadrant, and repairing...
46 CFR 28.370 - Wiring methods and materials.
Code of Federal Regulations, 2014 CFR
2014-10-01
... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...
46 CFR 28.370 - Wiring methods and materials.
Code of Federal Regulations, 2012 CFR
2012-10-01
... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...
46 CFR 28.370 - Wiring methods and materials.
Code of Federal Regulations, 2013 CFR
2013-10-01
... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...
Combustibility of Electrical Wire and Cable for Rail Rapid Transit Systems. Volume 1. Flammability.
DOT National Transportation Integrated Search
1983-05-01
The objective of this study was to examine the flammability of wires and cables used in rapid rail transit systems. The overall goal of the study was to quantify the fire properties of wires and cables in a manner so that the relative fire hazards co...
Combustibility of Electrical Wire and Cable for Rail Rapid Transit Systems. Volume 2. Toxicity.
DOT National Transportation Integrated Search
1983-05-01
The objective of this study was to examine the flammability of wires and cables used in rapid rail transit systems. The overall goal of the study was to quantify the fire properties of wires and cables in a manner so that the relative fire hazards co...
7 CFR 1755.406 - Shield or armor ground resistance measurements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... or armor ground resistance measurements shall be made on completed lengths of copper cable and wire... measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber optic...
7 CFR 1755.406 - Shield or armor ground resistance measurements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... or armor ground resistance measurements shall be made on completed lengths of copper cable and wire... measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber optic...
7 CFR 1755.406 - Shield or armor ground resistance measurements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... or armor ground resistance measurements shall be made on completed lengths of copper cable and wire... measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber optic...
NASA Astrophysics Data System (ADS)
Saghir, Hassane
Aircraft systems are interconnected by cable bundles that may represent a hundred kilometres. Those wirings penalize the aircraft weight. Cable bundles favour electromagnetic interference on board aircraft and routing a new cable for integrating new equipment boxes in a sustained aircraft requires a lot of retrofit work. Consequently, the aviation industry and aerospace community are working in the scope of different projects on new alternatives that will better fit to the future generation of aircrafts and help to reduce interconnecting wires on board. Wireless technologies represent a coveted solution that could make significant improvements and benefits to new generations of aircrafts. This research work focuses on the study of the wireless propagation over some frequency bands inside commercial aircrafts. The main objective is to provide conclusions and recommendations on criteria that may help optimizing the wireless communication without impacting the existent systems. Targeted applications are the inflight entertainment (IFE) service and wireless sensing systems. This work was conducted in collaboration with Bombardier-Aerospace based in Montreal (QC) in the frame of AVIO-402 project under the grant of CRIAQ (http://www.criaq.aero/). In this study, an experimental characterization of the propagation channel in the ISM band around 2.4 GHz frequency 5.8 GHz has been performed in a CRJ700 aircraft from Bombardier Aerospace. This characterization allowed to extract the parameters needed to analyze the channel behavior. The measurements results have shown that the propagation characteristics are close to those of both typical indoor medium in terms of the delay spread and a tunnel in terms of path loss. Then, a 3D channel modeling and simulation have been achieved with an RF prediction software (Wireless Insite Remcom). The simulations also consider the millimeter band around 60 GHz. The simulations yielded to analytical models of radio coverage which were subsequently used to evaluate wireless link interference scenarios and performance metrics. Finally, these models were used to design a TDL (Tapped Delay Line) channel model with the goal of an implementation under Matlab in a wireless transmission chain.
Development and preclinical testing of a new tension-band device for the spine: the Loop system.
Garner, Matthew D; Wolfe, Steven J; Kuslich, Stephen D
2002-10-01
Wire sutures, cerclage constructs, and tension bands have been used for many years in orthopedic surgery. Spinous process and sublaminar wires and other strands or cables are used in the spine to re-establish stability of the posterior spinal ligament complex. Rigid monofilament wires often fail due to weakening created during twisting or wrapping. Stronger metal cables do not conform well to bony surfaces. Polyethylene cables have higher fatigue strength than metal cables. The Loop cable is a pliable, radiolucent, polyethylene braid. Creep of the Loop/locking clip construct is similar to metal cable constructs using crimps. Both systems have less creep than knotted polyethylene cable constructs.
Development of a High Performance, Low-Profile Translation Table with Wire Feedthrough
NASA Technical Reports Server (NTRS)
Few, Alex
2016-01-01
NEAScout, a 6U cubesat, will use an 85 sq m solar sail to travel to a near-earth asteroid for observation. Over the course of the 3-year mission, a combination of reaction wheels, cold gas reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was addressed and a new subsystem was introduced to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space-about 17 mm of the vehicle's assembly height-and was required to generate +/-10 cm by +/-5 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the design downselect process and breadboarding for designing low-profile translation stages with feedthrough capabilities.
47 CFR 76.804 - Disposition of home run wiring.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an MDU...
47 CFR 76.804 - Disposition of home run wiring.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an MDU...
47 CFR 76.804 - Disposition of home run wiring.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an MDU...
47 CFR 76.804 - Disposition of home run wiring.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Disposition of home run wiring. 76.804 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a) Building-by-building disposition of home run wiring. (1) Where an MVPD owns the home run wiring in an MDU...
Thermal Control Method for High-Current Wire Bundles by Injecting a Thermally Conductive Filler
NASA Technical Reports Server (NTRS)
Rodriguez-Ruiz, Juan; Rowles, Russell; Greer, Greg
2011-01-01
A procedure was developed to inject thermal filler material (a paste-like substance) inside the power wire bundle coming from solar arrays. This substance fills in voids between wires, which enhances the heat path and reduces wire temperature. This leads to a reduced amount of heat generated. This technique is especially helpful for current and future generation high-power spacecraft (1 kW or more), because the heat generated by the power wires is significant enough to cause unacceptable overheating to critical components that are in close contact with the bundle.
Berton, C; Puskas, G J; Christofilopoulos, P; Stern, R; Hoffmeyer, P; Lübbeke, A
2012-11-01
There are no recent studies comparing cable with wire for the fixation of osteotomies or fractures in total hip replacement (THR). Our objective was to evaluate the five-year clinical and radiological outcomes and complication rates of the two techniques. We undertook a review including all primary and revision THRs performed in one hospital between 1996 and 2005 using cable or wire fixation. Clinical and radiological evaluation was performed five years post-operatively. Cables were used in 51 THRs and wires in 126, and of these, 36 THRs with cable (71%) and 101 with wire (80%) were evaluated at follow-up. The five-year radiographs available for 33 cable and 91 wire THRs revealed rates of breakage of fixation of 12 of 33 (36%) and 42 of 91 (46%), respectively. With cable there was a significantly higher risk of metal debris (68% vs. 9%; adjusted relative risk (RR) 6.6; 95% confidence interval (CI) 3.0 to 14.1), nonunion (36% vs. 21%; adjusted RR 2.0; 95% CI 1.0 to 3.9) and osteolysis around the material, acetabulum or femur (61% vs 19%; adjusted RR 3.9; 95% CI 2.3 to 6.5). Cable breakage increased the risk of osteolysis to 83%. There was a trend towards foreign-body reaction and increased infection with cables. Clinical results did not differ between the groups. In conclusion, we found a higher incidence of complications and a trend towards increased infection and foreign-body reaction with the use of cables.
Fiber optics for aircraft engine/inlet control
NASA Technical Reports Server (NTRS)
Baumbick, R. J.
1981-01-01
NASA programs that focus on the use of fiber optics for aircraft engine/inlet control are reviewed. Fiber optics for aircraft control is attractive because of its inherent immunity to EMI and RFI noise. Optical signals can be safely transmitted through areas that contain flammable or explosive materials. The use of optics also makes remote sensing feasible by eliminating the need for electrical wires to be connected between sensors and computers. Using low-level optical signals to control actuators is also feasible when power is generated at the actuator. Each application of fiber optics for aircraft control has different requirements for both the optical cables and the optical connectors. Sensors that measure position and speed by using slotted plates can use lossy cables and bundle connectors if data transfer is in the parallel mode. If position and speed signals are multiplexed, cable and connector requirements change. Other sensors that depend on changes in transmission through materials require dependable characteristics of both the optical cables and the optical connectors. A variety of sensor types are reviewed, including rotary position encoders, tachometers, temperature sensors, and blade tip clearance sensors for compressors and turbines. Research on a gallium arsenide photoswitch for optically switched actuators that operate at 250 C is also described.
Fixation systems of greater trochanteric osteotomies: biomechanical and clinical outcomes.
Jarit, Gregg J; Sathappan, Sathappan S; Panchal, Anand; Strauss, Eric; Di Cesare, Paul E
2007-10-01
The development of cerclage systems for fixation of greater trochanteric osteotomies has progressed from monofilament wires to multifilament cables to cable grip and cable plate systems. Cerclage wires and cables have various clinical indications, including fixation for fractures and for trochanteric osteotomy in hip arthroplasty. To achieve stable fixation and eventual union of the trochanteric osteotomy, the implant must counteract the destabilizing forces associated with pull of the peritrochanteric musculature. The material properties of cables and cable grip systems are superior to those of monofilament wires; however, potential complications with the use of cables include debris generation and third-body polyethylene wear. Nevertheless, the cable grip system provides the strongest fixation and results in lower rates of nonunion and trochanteric migration. Cable plate constructs show promise but require further clinical studies to validate their efficacy and safety.
30 CFR 75.516 - Power wires; support.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires; support. 75.516 Section 75.516...
30 CFR 75.516 - Power wires; support.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires; support. 75.516 Section 75.516...
30 CFR 75.516 - Power wires; support.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires; support. 75.516 Section 75.516...
30 CFR 75.516 - Power wires; support.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires; support. 75.516 Section 75.516... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables...
30 CFR 75.516 - Power wires; support.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires; support. 75.516 Section 75.516... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables...
47 CFR 76.804 - Disposition of home run wiring.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Disposition of home run wiring. 76.804 Section 76.804 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.804 Disposition of home run wiring. (a...
46 CFR 28.370 - Wiring methods and materials.
Code of Federal Regulations, 2010 CFR
2010-10-01
... wire must have insulated, stranded copper conductors of the appropriate size and voltage rating for the... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits...
Biomechanical performance of different cable and wire cerclage configurations.
Lenz, Mark; Perren, Stephan Marcel; Richards, Robert Geoff; Mückley, Thomas; Hofmann, Gunther Olaf; Gueorguiev, Boyko; Windolf, Markus
2013-01-01
Cerclage technology is regaining interest due to the increasing number of periprosthetic fractures. Different wiring techniques have been formerly proposed and have hibernated over years. Hereby, they are compared to current cerclage technology. Seven groups (n = 6) of different cable cerclage (Ø1.7 mm, crimp closure) configurations (one single cerclage looped once around the shells, one single cerclage looped twice, two cerclages each looped once) and solid wire cerclages (Ø1.5 mm, twist closure) (same configurations as cable cerclages, and two braided wires, twisted around each other looped once) fixed two cortical half shells of human femoral shaft mounted on a testing jig. Sinusoidal cyclic loading with constantly increasing force (0.1 N/cycle) was applied starting at 50 N peak load. Cerclage pretension (P), load leading to onset of plastic deformation (D) and load at total failure (T) were identified. Statistical differences between the groups were detected by univariate ANOVA. Double looped cables (P442N ± 129; D1334N ± 319; T2734N ± 330) performed significantly better (p < 0.05) than single looped cables (P292N ± 56; D646N ± 108; T1622N ± 171) and were comparable to two single cables (P392N ± 154; D1191N ± 334; T2675N ± 361). Double looped wires (P335N ± 49; D752N ± 119; T1359N ± 80) were significantly better (p < 0.05) than single looped wires (P181N ± 16; D343N ± 33; T606N ± 109) and performed similarly to single looped cables. Braided wires (P119N ± 26; D225N ± 55; T919N ± 197) exhibited early loss of pretension and plastic deformation. Double looped cerclages provided a better fixation stability compared to a single looped cerclage. Double looped wires were comparable to a single looped cable. The use of braided wires could not be recommended mechanically.
Huhn, S L; Wolf, A L; Ecklund, J
1991-12-01
Cervical instability secondary to fracture/dislocation or traumatic subluxation involving the posterior elements may be treated by a variety of fusion techniques. The rigidity of the stainless steel wires used in posterior cervical fusions often leads to difficulty with insertion, adequate tension, and conformation of the graft construct. This report describes a technique of posterior cervical fusion employing a wire system using flexible stainless steel cables. The wire consists of a flexible, 49-strand, stainless steel cable connected on one end to a short, malleable, blunt leader with the opposite end connected to a small islet. The cable may be used in occipitocervical, atlantoaxial, facet-to-spinous process, and interspinous fusion techniques. The cable loop is secured by using a tension/crimper device that sets the desired tension in the cable. In addition to superior biomechanical strength, the flexibility of the cable allows greater ease of insertion and tension adjustment. In terms of direct operative instrumentation in posterior cervical arthrodesis, involving both the upper and lower cervical spine, the cable system appears to be a safe and efficient alternative to monofilament wires.
Home and School Technology: Wired versus Wireless.
ERIC Educational Resources Information Center
Van Horn, Royal
2001-01-01
Presents results of informal research on smart homes and appliances, structured home wiring, whole-house audio/video distribution, hybrid cable, and wireless networks. Computer network wiring is tricky to install unless all-in-one jacketed cable is used. Wireless phones help installers avoid pre-wiring problems in homes and schools. (MLH)
NASA Technical Reports Server (NTRS)
Few, Alex
2016-01-01
NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.
NASA Technical Reports Server (NTRS)
Few, Alex
2016-01-01
NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.
Wire and Cable Cold Bending Test
NASA Technical Reports Server (NTRS)
Colozza, Anthony
2010-01-01
One of the factors in assessing the applicability of wire or cable on the lunar surface is its flexibility under extreme cold conditions. Existing wire specifications did not address their mechanical behavior under cold, cryogenic temperature conditions. Therefore tests were performed to provide this information. To assess this characteristic 35 different insulated wire and cable pieces were cold soaked in liquid nitrogen. The segments were then subjected to bending and the force was recorded. Any failure of the insulation or jacketing was also documented for each sample tested. The bending force tests were performed at room temperature to provide a comparison to the change in force needed to bend the samples due to the low temperature conditions. The results from the bending tests were plotted and showed how various types of insulated wire and cable responded to bending under cold conditions. These results were then used to estimate the torque needed to unroll the wire under these low temperature conditions.
Electro-mechanical characterization of MgB2 wires for the Superconducting Link Project at CERN
NASA Astrophysics Data System (ADS)
Konstantopoulou, K.; Ballarino, A.; Gharib, A.; Stimac, A.; Garcia Gonzalez, M.; Perez Fontenla, A. T.; Sugano, M.
2016-08-01
In previous years, the R & D program between CERN and Columbus Superconductors SpA led to the development of several configurations of MgB2 wires. The aim was to achieve excellent superconducting properties in high-current MgB2 cables for the HL-LHC upgrade. In addition to good electrical performance, the superconductor shall have good mechanical strength in view of the stresses during operation (Lorenz forces and thermal contraction) and handling (tension and bending) during cabling and installation at room temperature. Thus, the study of the mechanical properties of MgB2 wires is crucial for the cable design and its functional use. In the present work we report on the electro-mechanical characterization of ex situ processed composite MgB2 wires. Tensile tests (critical current versus strain) were carried out at 4.2 K and in a 3 T external field by means of a purpose-built bespoke device to determine the irreversible strain limit of the wire. The minimum bending radius of the wire was calculated taking into account the dependence of the critical current with the strain and it was then used to obtain the minimum twist pitch of MgB2 wires in the cable. Strands extracted from cables having different configurations were tested to quantify the critical current degradation. The Young’s modulus of the composite wire was measured at room temperature. Finally, all measured mechanical parameters will be used to optimize an 18-strand MgB2 cable configuration.
DOT National Transportation Integrated Search
1991-01-01
During the construction of the I-295 cable-stayed bridge, a number of the stays on the main span cantilever were instrumented with electrical resistance strain gages mounted directly on the wires of the seven-wire strands making up the stay cables. M...
Fujita, Masaru; Diab, Mohammad; Xu, Zheng; Puttlitz, Christian M
2006-09-01
An in vitro biomechanical calf thoracic spine study. To evaluate the biomechanical stability of sublaminar and subtransverse process fixation using stainless steel wires and ultra-high molecular weight polyethylene (UHMWPE) cables. It is commonly held that transverse process fixation provides less stability than sublaminar fixation. To our knowledge, this is the first biomechanical study to compare the stability afforded by sublaminar fixation and subtransverse process fixation using metal wire and UHMWPE cable before and after cyclic loading. There were 6 fresh-frozen calf thoracic spines (T4-T9) used to determine the sublaminar fixation stiffness and subtransverse process fixation stiffness in each group. Double strands of 18-gauge stainless steel wire, 3 and 5 mm-width UHMWPE cable (Nesplon; Alfresa, Inc., Osaka, Japan) were applied to each spine. Cyclic pure flexion-extension moment loading (2 Nm, 0.5 Hz, 5000 cycles) was applied after the initial stability was analyzed by measuring the range of motion. Statistical analyses were used to delineate differences between the various experimental groups. Subtransverse process wiring was more stable than sublaminar wiring after cyclic loading in flexion-extension (P < 0.05). There were no significant differences between each group in lateral bending and axial rotation after cyclic loading. Sublaminar stainless steel wiring was more stable than sublaminar 3 and 5-mm cable before and after cyclic loading in axial rotation (P < 0.01). Acute subtransverse process fixation using 3-mm cable was less stable after cyclic loading in axial rotation (P < 0.05). All other groups did not produce statistically significant differences. Subtransverse process fixation provides at least as much stability as sublaminar fixation. A 5-mm UHMWPE cable and stainless steel wire result in equivalent sublaminar and subtransverse process stability.
NASA Technical Reports Server (NTRS)
1972-01-01
The practical use of small-gage round wire for electrical wiring in manned air and space vehicle environments is discussed. The investigation consisted on a study of wire construction and candidate wire harness concepts, fabrication of small-gage wire harnesses, and verification of promising configurations by laboratory evaluation. The wire constructions selected for harness fabrication are described. Results of the laboratory evaluation are included.
Crashworthy Troop Seat Testing Program
1977-11-01
19 ’rest 4 . . . . . . . . . .. . 29 | Detail Design’Finalization. .... 29 Vertical Wire - Bending Energy Attenuator 32 Toggle Latch...Strut Wire - Bending Attenuator Force Deflection. . . . ................... 28 15 Notched Wire and Pin Anchorage Test Specimen . 30 16 Quick-Disconnect...and Hold-Down Cable ......... 31 17 Failed Hold-Down Cable ...... . . . . 31 18 Wire - Bending Tension/Compression Energy Attenuator
46 CFR 28.865 - Wiring methods and materials.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Wiring methods and materials. 28.865 Section 28.865... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... terminals is not more than 10 percent. (c) Cable and wiring not serving equipment in high risk fire areas...
2016-12-01
Universal Test Machine. .................. 7 Figure 2.2. Pull-test results of PT seven-wire strand cable surrounded by a quickset, steel - reinforced epoxy...13 Figure 2.7. Pull-test results of PT seven-wire strand cable surrounded by a quickset, steel - reinforced...surrounded by a thick layer of quickset, steel -reinforced epoxy and with 40% reduced wedges. ....................................................... 15
Rabalais, R David; Burger, Evalina; Lu, Yun; Mansour, Alfred; Baratta, Richard V
2008-02-01
This study compared the biomechanical properties of 2 tension-band techniques with stainless steel wire and ultra high molecular weight polyethylene (UHMWPE) cable in a patella fracture model. Transverse patella fractures were simulated in 8 cadaver knees and fixated with figure-of-8 and parallel wire configurations in combination with Kirschner wires. Identical configurations were tested with UHMWPE cable. Specimens were mounted to a testing apparatus and the quadriceps was used to extend the knees from 90 degrees to 0 degrees; 4 knees were tested under monotonic loading, and 4 knees were tested under cyclic loading. Under monotonic loading, average fracture gap was 0.50 and 0.57 mm for steel wire and UHMWPE cable, respectively, in the figure-of-8 construct compared with 0.16 and 0.04 mm, respectively, in the parallel wire construct. Under cyclic loading, average fracture gap was 1.45 and 1.66 mm for steel wire and UHMWPE cable, respectively, in the figure-of-8 construct compared with 0.45 and 0.60 mm, respectively, in the parallel wire construct. A statistically significant effect of technique was found, with the parallel wire construct performing better than the figure-of-8 construct in both loading models. There was no effect of material or interaction. In this biomechanical model, parallel wires performed better than the figure-of-8 configuration in both loading regimens, and UHMWPE cable performed similarly to 18-gauge steel wire.
Flat conductor cable design, manufacture, and installation
NASA Technical Reports Server (NTRS)
Angele, W.; Hankins, J. D.
1973-01-01
Pertinent information for hardware selection, design, manufacture, and quality control necessary for flat conductor cable interconnecting harness application is presented. Comparisons are made between round wire cable and flat conductor cable. The flat conductor cable interconnecting harness systems show major cost, weight, and space savings, plus increased system performance and reliability. The design application section includes electrical characteristics, harness design and development, and a full treatise on EMC considerations. Manufacturing and quality control sections pertain primarily to the developed conductor-contact connector system and special flat conductor cable to round wire cable transitions.
Wu, Jianfeng; Wang, Yu; Li, Jianqing; Song, Aiguo
2016-01-01
For suppressing the crosstalk problem due to wire resistances and contacted resistances of the long flexible cables in tactile sensing systems, we present a novel two-wire fast readout approach for the two-dimensional resistive sensor array in shared row-column fashion. In the approach, two wires are used for every driving electrode and every sampling electrode in the resistive sensor array. The approach with a high readout rate, though it requires a large number of wires and many sampling channels, solves the cable crosstalk problem. We also verified the approach’s performance with Multisim simulations and actual experiments. PMID:27213373
Machine Tests Optical Fibers In Flexure
NASA Technical Reports Server (NTRS)
Darejeh, Hadi; Thomas, Henry; Delcher, Ray
1993-01-01
Machine repeatedly flexes single optical fiber or cable or bundle of optical fibers at low temperature. Liquid nitrogen surrounds specimen as it is bent back and forth by motion of piston. Machine inexpensive to build and operate. Tests under repeatable conditions so candidate fibers, cables, and bundles evaluated for general robustness before subjected to expensive shock and vibration tests.
14 CFR 25.1713 - Fire protection: EWIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1713... used during emergency procedures must be fire resistant. (c) Insulation on electrical wire and electrical cable, and materials used to provide additional protection for the wire and cable, installed in...
Method of fabricating a homogeneous wire of inter-metallic alloy
Ohriner, Evan Keith; Blue, Craig Alan
2001-01-01
A method for fabricating a homogeneous wire of inter-metallic alloy comprising the steps of providing a base-metal wire bundle comprising a metal, an alloy or a combination thereof; working the wire bundle through at least one die to obtain a desired dimension and to form a precursor wire; and, controllably heating the precursor wire such that a portion of the wire will become liquid while simultaneously maintaining its desired shape, whereby substantial homogenization of the wire occurs in the liquid state and additional homogenization occurs in the solid state resulting in a homogenous alloy product.
Wang, S.T.
1994-11-01
A wire cable assembly adapted for the winding of electrical coils is taught. A primary intended use is for use in particle tube assemblies for the Superconducting Super Collider. The correction coil cables have wires collected in wire array with a center rib sandwiched therebetween to form a core assembly. The core assembly is surrounded by an assembly housing having an inner spiral wrap and a counter wound outer spiral wrap. An alternate embodiment of the invention is rolled into a keystoned shape to improve radial alignment of the correction coil cable on a particle tube in a particle tube assembly. 7 figs.
75 FR 7557 - Airworthiness Directives; The Boeing Company Model 767 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... shorts in many systems, including the spar fuel shut off valve, oxygen mask deployment, and burned wires... and wire bundles, causing shorts in many systems, including the spar fuel shut off valve, oxygen mask... and wire bundles, causing shorts in many systems, including the spar fuel shut off valve, oxygen mask...
Process for making RF shielded cable connector assemblies and the products formed thereby
NASA Technical Reports Server (NTRS)
Fisher, A.; Clatterbuck, C. H. (Inventor)
1973-01-01
A process for making RF shielded cable connector assemblies and the resulting structures is described. The process basically consists of potting wires of a shielded cable between the cable shield and a connector housing to fill in, support, regidize, and insulate the individual wires contained in the cable. The formed potting is coated with an electrically conductive material so as to form an entirely encompassing adhering conductive path between the cable shield and the metallic connector housing. A protective jacket is thereby formed over the conductive coating between the cable shield and the connector housing.
Strength of cerclage fixation systems: a biomechanical study.
Incavo, S J; Difazio, F; Wilder, D
1990-11-01
This study examined the load to failure ratio and stiffness of eight different cerclage techniques commonly used in the clinical management of fractures. For a single-loop cerclage, titanium cable was the strongest, while stainless steel wire secured with a commercial tightener was the weakest (P < 0.05). When a single-loop configuration is necessary (i.e. trochanteric attachment) a cable system is superior to cerclage wiring. A double-wrap of either cable or wire was considerably stronger than any single-wrap cerclage technique and stronger than two cerclage wires (P < 0.05). Copyright © 1990. Published by Elsevier Ltd.
7 CFR 1755.860 - RUS specification for filled buried wires.
Code of Federal Regulations, 2012 CFR
2012-01-01
... sufficient heat barrier to prevent visible evidence of conductor insulation deformation or adhesion between... Insulations and Jackets for Telecommunications Wire and Cable; ASTM D 4566-90, Standard Test Methods for Electrical Performance Properties of Insulations and Jackets for Telecommunications Wire and Cable; ASTM D...
7 CFR 1755.860 - RUS specification for filled buried wires.
Code of Federal Regulations, 2014 CFR
2014-01-01
... sufficient heat barrier to prevent visible evidence of conductor insulation deformation or adhesion between... Insulations and Jackets for Telecommunications Wire and Cable; ASTM D 4566-90, Standard Test Methods for Electrical Performance Properties of Insulations and Jackets for Telecommunications Wire and Cable; ASTM D...
7 CFR 1755.860 - RUS specification for filled buried wires.
Code of Federal Regulations, 2013 CFR
2013-01-01
... sufficient heat barrier to prevent visible evidence of conductor insulation deformation or adhesion between... Insulations and Jackets for Telecommunications Wire and Cable; ASTM D 4566-90, Standard Test Methods for Electrical Performance Properties of Insulations and Jackets for Telecommunications Wire and Cable; ASTM D...
NASA Astrophysics Data System (ADS)
Baranov, M. I.; Rudakov, S. V.
2018-03-01
The authors have given results of investigations of the electrothermal action of aperiodic pulses of temporal shape 10/350 μs of the current of a short artificial-lightning stroke on test specimens of electric wires and cables with copper and aluminum cores and sheaths with polyvinylchloride and polyethylene insulations of power circuits of industrial electric power objects. It has been shown that the thermal stability of such wires and cables is determined by the action integral of the indicated current pulse. The authors have found the maximum permissible and critical densities of this pulse in copper and aluminum current-carrying parts of the wires and cables. High-current experiments conducted under high-voltage laboratory conditions on a unique generator of 10/350 μs pulses of an artificial-lightning current with amplitude-time parameters normalized according to the existing requirements of international and national standards and with tolerances on them have confirmed the reliability of the proposed calculated estimate for thermal lightning resistance of cabling and wiring products.
NASA Astrophysics Data System (ADS)
Baranov, M. I.; Rudakov, S. V.
2018-05-01
The authors have given results of investigations of the electrothermal action of aperiodic pulses of temporal shape 10/350 μs of the current of a short artificial-lightning stroke on test specimens of electric wires and cables with copper and aluminum cores and sheaths with polyvinylchloride and polyethylene insulations of power circuits of industrial electric power objects. It has been shown that the thermal stability of such wires and cables is determined by the action integral of the indicated current pulse. The authors have found the maximum permissible and critical densities of this pulse in copper and aluminum current-carrying parts of the wires and cables. High-current experiments conducted under high-voltage laboratory conditions on a unique generator of 10/350 μs pulses of an artificial-lightning current with amplitude-time parameters normalized according to the existing requirements of international and national standards and with tolerances on them have confirmed the reliability of the proposed calculated estimate for thermal lightning resistance of cabling and wiring products.
Carbon nanotube wires and cables: Near-term applications and future perspectives
NASA Astrophysics Data System (ADS)
Jarosz, Paul; Schauerman, Christopher; Alvarenga, Jack; Moses, Brian; Mastrangelo, Thomas; Raffaelle, Ryne; Ridgley, Richard; Landi, Brian
2011-11-01
Wires and cables are essential to modern society, and opportunities exist to develop new materials with reduced resistance, mass, and/or susceptibility to fatigue. This article describes how carbon nanotubes (CNTs) offer opportunities for integration into wires and cables for both power and data transmission due to their unique physical and electronic properties. Macroscopic CNT wires and ribbons are presently shown as viable replacements for metallic conductors in lab-scale demonstrations of coaxial, USB, and Ethernet cables. In certain applications, such as the outer conductor of a coaxial cable, CNT materials may be positioned to displace metals to achieve substantial benefits (e.g. reduction in cable mass per unit length (mass/length) up to 50% in some cases). Bulk CNT materials possess several unique properties which may offer advantages over metallic conductors, such as flexure tolerance and environmental stability. Specifically, CNT wires were observed to withstand greater than 200,000 bending cycles without increasing resistivity. Additionally, CNT wires exhibit no increase in resistivity after 80 days in a corrosive environment (1 M HCl), and little change in resistivity with temperature (<1% from 170-330 K). This performance is superior to conventional metal wires and truly novel for a wiring material. However, for CNTs to serve as a full replacement for metals, the electrical conductivity of CNT materials must be improved. Recently, the conductivity of a CNT wire prepared through simultaneous densification and doping has exceeded 1.3 × 106 S/m. This level of conductivity brings CNTs closer to copper (5.8 × 107 S/m) and competitive with some metals (e.g. gold) on a mass-normalized basis. Developments in manipulation of CNT materials (e.g. type enrichment, doping, alignment, and densification) have shown progress towards this goal. In parallel with efforts to improve bulk conductivity, integration of CNT materials into cabling architectures will require development in electrical contacting. Several methods for contacting bulk CNT materials to metals are demonstrated, including mechanical crimping and ultrasonic bonding, along with a method for reducing contact resistance by tailoring the CNT-metal interface via electroless plating. Collectively, these results summarize recent progress in CNT wiring technologies and illustrate that nanoscale conductors may become a disruptive technology in cabling designs.
Carbon nanotube wires and cables: near-term applications and future perspectives.
Jarosz, Paul; Schauerman, Christopher; Alvarenga, Jack; Moses, Brian; Mastrangelo, Thomas; Raffaelle, Ryne; Ridgley, Richard; Landi, Brian
2011-11-01
Wires and cables are essential to modern society, and opportunities exist to develop new materials with reduced resistance, mass, and/or susceptibility to fatigue. This article describes how carbon nanotubes (CNTs) offer opportunities for integration into wires and cables for both power and data transmission due to their unique physical and electronic properties. Macroscopic CNT wires and ribbons are presently shown as viable replacements for metallic conductors in lab-scale demonstrations of coaxial, USB, and Ethernet cables. In certain applications, such as the outer conductor of a coaxial cable, CNT materials may be positioned to displace metals to achieve substantial benefits (e.g. reduction in cable mass per unit length (mass/length) up to 50% in some cases). Bulk CNT materials possess several unique properties which may offer advantages over metallic conductors, such as flexure tolerance and environmental stability. Specifically, CNT wires were observed to withstand greater than 200,000 bending cycles without increasing resistivity. Additionally, CNT wires exhibit no increase in resistivity after 80 days in a corrosive environment (1 M HCl), and little change in resistivity with temperature (<1% from 170-330 K). This performance is superior to conventional metal wires and truly novel for a wiring material. However, for CNTs to serve as a full replacement for metals, the electrical conductivity of CNT materials must be improved. Recently, the conductivity of a CNT wire prepared through simultaneous densification and doping has exceeded 1.3 × 10(6) S/m. This level of conductivity brings CNTs closer to copper (5.8 × 10(7) S/m) and competitive with some metals (e.g. gold) on a mass-normalized basis. Developments in manipulation of CNT materials (e.g. type enrichment, doping, alignment, and densification) have shown progress towards this goal. In parallel with efforts to improve bulk conductivity, integration of CNT materials into cabling architectures will require development in electrical contacting. Several methods for contacting bulk CNT materials to metals are demonstrated, including mechanical crimping and ultrasonic bonding, along with a method for reducing contact resistance by tailoring the CNT-metal interface via electroless plating. Collectively, these results summarize recent progress in CNT wiring technologies and illustrate that nanoscale conductors may become a disruptive technology in cabling designs.
Application of superconducting coils to the NASA prototype magnetic balance
NASA Technical Reports Server (NTRS)
Haldeman, C. W.; Kraemer, R. A.; Phey, S. W.; Alishahi, M. M.; Covert, E. E.
1981-01-01
Application of superconducting coils to a general purpose magnetic balance was studied. The most suitable currently available superconducting cable for coils appears to be a bundle of many fine wires which are transposed and are mechanically confined. Sample coils were tested at central fields up to .5 Tesla, slewing rates up to 53 Tesla/ sec and frequencies up to 30 Hz. The ac losses were measured from helium boil-off and were approximately 20% higher than those calculated. Losses were dominated by hysteresis and a model for loss calculation which appears suitable for design purposes is presented along with computer listings. Combinations of two coils were also tested and interaction losses are reported. Two feasible geometries are also presented for prototype magnetic balance using superconductors.
A biomechanical comparison of three sternotomy closure techniques.
Cohen, David J; Griffin, Lanny V
2002-02-01
A biomechanical study of three sternotomy closure techniques (figure-of-eight stainless-steel wires, Pectofix Dynamic Sternal Fixation [DSF] stainless-steel plates, and figure-of-eight stainless-steel cables) was conducted to compare strength and stiffness variables in three clinically relevant loading modes (anterior-posterior shear, longitudinal shear, and lateral distraction). All tests were conducted on polyurethane foam sternal models that simulate the properties of cancellous bone. Each model was divided longitudinally and reconstructed using one of the sternotomy closure repair techniques. Tests were performed using a materials testing system that applies a continuously increasing amount of force in one direction to the model until it catastrophically breaks. A total of six trials of each fixation type in each of three test groups were prepared and tested, for a total of 54 tests. Strength and stiffness variables as well as a post-yield analysis of failure were evaluated. Sternums repaired using the DSF plate system are a more rigid construct than sternums repaired using the stainless-steel wires or cables in the distraction and transverse shear modes and they are not significantly different from sternums repaired with wires or cables in the longitudinal shear mode. The DSF plate system offers a 25% improvement in resistance to failure (yield) compared to wires when a transverse shear force is applied to the model. The cable system had a higher resistance to failure than the wires in all modes although the differences were not statistically significant. Additionally, the DSF plate system provides substantial reduction of the implant's cutting into the sternal model under loading as evidenced by the post-yield displacement when compared with either cables or wires for the distraction and longitudinal shear modes. For the transverse shear mode, the cables or wires would completely fail at the load for which cutting begins for the DSF. Both the DSF plate system and the stainless-steel cable system offer important advantages over figure-of-eight wire for sternal closure.
1991-11-01
S. Windeler, Bell Laboratories- 1970 Dr. 0. Leuchs, Kable and Metalwerke-"A New Self -Ex- "A Low Capacitance Cable for the T2 Digital Trans...Pickering is a member implementation as well as test and evaluation, of the New York Rubber Group, the Wire production base planning and product assurance...metallic German power utilities. ground or phase wire. The thus created new aerial cable changes in its mechanical characteristics only unimportantly
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lebouc, L.; Marmignon, J.
1983-03-29
A cable for prospecting, said cable including a core of conductor wires surrounded by insulating material and by armour formed by at least one layer of helically wound steel wires. It includes, from its center to its periphery, inside the armour, an axial monofilament made of a polymer that withstands high temperatures, said monofilament forming the insulation of an inner conductor, an outer conductor and a sheath made of a thermoplastic substance that withstands high temperatures, said inner conductor serving a different electrical function than said core of conductor wires.
Dunne, Ben; Murphy, Mark; Skiba, Rohen; Wang, Xiao; Ho, Kwok; Larbalestier, Robert; Merry, Christopher
2016-01-01
OBJECTIVES Deep sternal wound infection is a devastating complication of cardiac surgery. In the current era of increasing patient comorbidity, newer techniques must be evaluated in attempts to reduce the rates of deep sternal wound infection. METHODS A randomized controlled trial comparing sternal closure with traditional sternal wires in figure-8 formation with the Pioneer cabling system® from Medigroup after adult cardiac surgery was performed. RESULTS A total of 273 patients were enrolled with 137 and 135 patients randomized to sternal wires and cables group, respectively. Baseline characteristics between the two groups were well balanced. Deep sternal wound infection occurred in 0.7% of patients in the wires group and 3.7% of patients in the cables group (absolute risk difference = −3.0%, 95% confidence interval: −7.7 to 0.9%; P = 0.12). Patients in the cables group were extubated slightly earlier than those in the sternal wires group postoperatively (9.7 vs 12.8 h; P = 0.03). There was, however, no significant difference in hospital and follow-up pain scores or analgesia requirements. CONCLUSIONS The Pioneer sternal cabling system appears to facilitate early extubation after adult cardiac surgery, but it does not reduce the rate of deep sternal infection Australian New Zealand Clinical Trials Registry: ANZCTR—ACTRN12615000973516. PMID:26912576
Hensman, C; Hanna, G B; Drew, T; Moseley, H; Cuschieri, A
1998-04-01
Skin burns and ignition of drapes have been reported with the use of cold light sources. The aim of the study was to document the temperature generated by cold light sources and to correlate this with the total radiated power and infrared output. The temperature, total radiated power, and infrared output were measured as a function of time at the end of the endoscope (which is inserted into the operative field) and the end of the fiber optic bundle of the light cable (which connects the cable to the light port of the endoscope) using halogen and xenon light sources. The highest temperature recorded at the end of the endoscope was 95 degrees C. The temperature measured at the optical fiber location of the endoscope was higher than at its lens surface (p < 0.0001). At the end of the fiber optic bundle of light cables, the temperature reached 225 degrees C within 15 s. The temperature recorded at the optical fiber location of all endoscopes and light cables studied rose significantly over a period of 10 min to reach its maximum (p <0.0001) and then leveled off for the duration of the study (30 min). The infrared output accounted only for 10% of the total radiated power. High temperatures are reached by 10 min at the end of fiber optic bundle of light cables and endoscopes with both halogen and xenon light sources. This heat generation is largely due to the radiated power in the visible light spectrum.
Hughey, Raburn L.; Sinha, Uday K.; Reece, David S.; Muller, Albert C.
2005-03-08
In order to provide a flexible oxide superconducting cable which is reduced in AC loss, tape-shaped superconducting wires covered with a stabilizing metal are wound on a flexible former. The superconducting wires are preferably laid on the former at a bending strain of not more than 0.2%. In laying on the former, a number of tape-shaped superconducting wires are laid on a core member in a side-by-side manner, to form a first layer. A prescribed number of tape-shaped superconducting wires are laid on top of the first layer in a side-by-side manner, to form a second layer. The former may be made of a metal, plastic, reinforced plastic, polymer, or a composite and provides flexibility to the superconducting wires and the cable formed therewith.
Hughey, Raburn L.; Sinha, Uday K.; Reece, David S.; Muller, Albert C.
2005-07-22
In order to provide a flexible oxide superconducting cable which is reduced in AC loss, tape-shaped superconducting wires covered with a stabilizing metal are wound on a flexible former. The superconducting wires are preferably laid on the former at a bending strain of not more than 0.2%. In laying on the former, a number of tape-shaped superconducting wires are laid on a core member in a side-by-side manner, to form a first layer. A prescribed number of tape-shaped superconducting wires are laid on top of the first layer in a side-by-side manner, to form a second layer. The former may be made of a metal, plastic, reinforced plastic, polymer, or a composite and provides flexibility to the superconducting wires and the cable formed therewith.
Thermo-Mechanical Behavior and Shakedown of Shape Memory Alloy Cable Structures
NASA Astrophysics Data System (ADS)
Biggs, Daniel B.
Shape memory alloys (SMAs) are a versatile class of smart materials that exhibit adaptive properties which have been applied to solve engineering problems in wide-ranging fields from aerospace to biomedical engineering. Yet there is a lack of understanding of the fundamental nature of SMAs in order to effectively apply them to challenging problems within these engineering fields. Stranding fine NiTi wires into a cable form satisfies the demands of many aerospace and civil engineering applications which require actuators to withstand large tensile loads. The impact of increased bending and twisting in stranded NiTi wire structures, as well as introducing contact mechanics to the unstable phase transformation is not well understood, and this work aims to fill that void. To study the scalability of NiTi cables, thermo-mechanical characterization tests are conducted on cables much larger than those previously tested. These cables are found to have good superelastic properties and repeatable cyclic behavior with minimal induced plasticity. The behavior of additional cables, which have higher transition temperatures that can be used in a shape memory mode as thermo-responsive, high force actuator elements, are explored. These cables are found to scale up the performance of straight wire by maintaining an equivalent work output. Moreover, this work investigates the degradation of the thermal actuation of SMA wires through novel stress-temperature paths, discovering several path dependent behaviors of transformation-induced plasticity. The local mechanics of NiTi cable structures are explored through experiments utilizing digital image correlation, revealing new periodic transformation instabilities. Finite element simulations are presented, which indicate that the instabilities are caused by friction and relative sliding between wires in a cable. Finally, a study of the convective heat transfer of helical wire involving a suite of wind tunnel experiments, numerical analyses, and an empirical correlation is presented. This provides a method to better model the thermal behavior of helical SMA actuators and highlights the non-monotonic dependence of the convective heat transfer coefficient of helical wire with respect to the angle of the flow.
Electrically isolated, high melting point, metal wire arrays and method of making same
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simpson, John T.; Cunningham, Joseph P.; D'Urso, Brian R.
2016-01-26
A method of making a wire array includes the step of providing a tube of a sealing material and having an interior surface, and positioning a wire in the tube, the wire having an exterior surface. The tube is heated to soften the tube, and the softened tube is drawn and collapsed by a mild vacuum to bring the interior surface of the tube into contact with the wire to create a coated wire. The coated wires are bundled. The bundled coated wires are heated under vacuum to fuse the tube material coating the wires and create a fused rodmore » with a wire array embedded therein. The fused rod is cut to form a wire array. A wire array is also disclosed.« less
In vitro biomechanical comparison of multistrand cables with conventional cervical stabilization.
Weis, J C; Cunningham, B W; Kanayama, M; Parker, L; McAfee, P C
1996-09-15
The biomechanical stability of six different methods of cervical spine stabilization, three using multistrand cables, were evaluated in a bovine model. To quantify and compare the in vitro biomechanical properties of multistrand cables used for posterior cervical wiring to standard cervical fixation techniques. Fixation of the posterior cervical spine with monofilament stainless steel wire is a proven technique for stabilization of the cervical spine. Recently, multistrand braided cables have been used as a substitute for monofilament stainless steel wires. These cables, made of stainless steel, titanium, or polyethylene, are reported to be stronger, more flexible, and fatigue resistant than are monofilament wire based on mechanical testing. However, no in vitro biomechanical studies have been performed testing a standard posterior cervical wiring technique using multistrand cables. Thirty-six fresh frozen cervical calf spines consistent in size and age were mounted and fixed rigidly to isolate the C4-C5 motion segment. Six different reconstruction techniques were evaluated for Rogers' posterior cervical wiring technique using: 1) 20-gauge stainless steel monofilament wire, 2) stainless steel cable, 3) titanium cable, 4) polyethylene cables, 5) anterior locking plate construct with interbody graft, and 6) posterior plate construct. Six cervical spines were included in each group (n = 6), with each specimen statically evaluated under three stability conditions: 1) intact, 2) reconstructed, and 3) postfatigue. The instability model created before the reconstruction consisted of a distractive flexion Stage 3 injury at C4-C5. Nondestructive static biomechanical testing, performed on an material testing machine (MTS 858 Bionix test system, Minneapolis, MN), included axial compression, axial rotation, flexion-extension, and lateral bending. After reconstruction and static analysis, the specimens were fatigued for 1500 cycles and then statically retested. Data analysis included normalization of the reconstructed and postfatigue data to the intact condition. The calculated static parameters included operative functional unit stiffness and range of motion. Posterior cervical reconstruction with stainless steel monofilament wire proved inadequate under fatigue testing. Two of the six specimens failed with fatigue, and this construct permitted the greatest degree of flexion-extension motion after fatigue in comparison with all other constructs (P < 0.05). There were no significant differences in flexural stiffness or range of motion between stainless steel, titanium, or polyethylene cable constructs before or after fatigue testing. The posterior cervical plate constructs were the stiffest constructs under flexion, extension, and lateral bending modes, before and after fatigue testing (P < 0.05). Multistrand cables were superior to monofilament wire with fatigue testing using an in vitro calf cervical spine model. There were no failures or detectable differences in elongation after fatigue testing between the stainless steel, titanium, and polyethylene cables, as shown by the flexion-extension range of motion. The posterior cervical plate construct offered the greatest stability compared with all other constructs.
46 CFR 28.865 - Wiring methods and materials.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...
46 CFR 28.865 - Wiring methods and materials.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...
46 CFR 28.865 - Wiring methods and materials.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...
46 CFR 28.865 - Wiring methods and materials.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...
Liu, Tie-long; Yan, Wang-jun; Han, Yu; Ye, Xiao-jian; Jia, Lian-shun; Li, Jia-shun; Yuan, Wen
2010-05-01
To compare the biomechanical performances of different wires and cable fixation devices in posterior instrumentation for atlantoaxial instability, and test the effect of different fixation strengths and fixation approaches on the surgical outcomes. Six specimens of the atlantoaxial complex (C0-C3) were used to establish models of the normal complex, unstable complex (type II odontoid fracture) and fixed complex. On the wd-5 mechanical testing machine, the parameters including the strength and rigidity of anti-rotation, change and strength of stress, and stability were measured for the normal complex, atlantoaxial instability complex, the new type titanium cable fixation system, Atlas titanium cable, Songer titanium cable, and stainless wire. The strength and rigidity of anti-rotation, change and strength of stress, stability of flexion, extension and lateral bending of the unstable atlantoaxial complex fixed by the new double locking titanium cable fixation system were superior to those of the Songer or Atlas titanium cable (P<0.05) and medical stainless wire (P<0.05). Simultaneous cable fastening on both sides resulted in better fixation effect than successive cable fastening (P<0.05). Better fixation effect was achieved by fastening the specimen following a rest (P<0.05). The fixation effects can be enhanced by increased fastening strengths. The new type double locking titanium cable fixation system has better biomechanical performance than the conventional Songer and Atlas titanium cables. Fastening the unstable specimens after a rest following simultaneous fastening of the specimen on both sides produces better fixation effect.
Investigation of the interwire energy transfer of elastic guided waves inside prestressed cables.
Treyssède, Fabien
2016-07-01
Elastic guided waves are of interest for the non-destructive evaluation of cables. Cables are most often multi-wire structures, and understanding wave propagation requires numerical models accounting for the helical geometry of individual wires, the interwire contact mechanisms and the effects of prestress. In this paper, a modal approach based on a so-called semi-analytical finite element method and taking advantage of a biorthogonality relation is proposed in order to calculate the forced response under excitation of a cable, multi-wired, twisted, and prestressed. The main goal of this paper is to investigate how the energy transfers from a given wire, directly excited, to the other wires in order to identify some localization of energy inside the active wire as the waves propagate along the waveguide. The power flow of the excited field is theoretically derived and an energy transfer parameter is proposed to evaluate the level of energy localization inside a given wire. Numerical results obtained for different polarizations of excitation, central and peripheral, highlight how the energy may localize, spread, or strongly change in the cross-section as waves travel along the axis. In particular, a compressional mode localized inside the central wire is found, with little dispersion and significant excitability.
Hirsch, Gregory
2002-01-01
A plurality of glass or metal wires are precisely etched to form the desired shape of the individual channels of the final polycapillary optic. This shape is created by carefully controlling the withdrawal speed of a group of wires from an etchant bath. The etched wires undergo a subsequent operation to create an extremely smooth surface. This surface is coated with a layer of material which is selected to maximize the reflectivity of the radiation being used. This reflective surface may be a single layer of material, or a multilayer coating for optimizing the reflectivity in a narrower wavelength interval. The collection of individual wires is assembled into a close-packed multi-wire bundle, and the wires are bonded together in a manner which preserves the close-pack configuration, irrespective of the local wire diameter. The initial wires are then removed by either a chemical etching procedure or mechanical force. In the case of chemical etching, the bundle is generally segmented by cutting a series of etching slots. Prior to removing the wire, the capillary array is typically bonded to a support substrate. The result of the process is a bundle of precisely oriented radiation-reflecting hollow channels. The capillary optic is used for efficiently collecting and redirecting the radiation from a source of radiation which could be the anode of an x-ray tube, a plasma source, the fluorescent radiation from an electron microprobe, a synchrotron radiation source, a reactor or spallation source of neutrons, or some other source.
Superconducting Cable Having A Felexible Former
Hughey, Raburn L.; Sinha, Uday K.; Reece, David S.; Muller, Albert C.
2005-03-15
In order to provide a flexible oxide superconducting cable which is reduced in AC loss, tape-shaped superconducting wires covered with a stabilizing metal are wound on a flexible former. The superconducting wires are preferably laid on the former at a bending strain of not more than 0.2%. In laying on the former, a number of tape-shaped superconducting wires are laid on a core member in a side-by-side manner, to form a first layer. A prescribed number of tape-shaped superconducting wires are laid on top of the first layer in a side-by-side manner, to form a second layer. The former may be made of a metal, plastic, reinforced plastic, polymer, or a composite and provides flexibility to the superconducting wires and the cable formed therewith.
Superconducting Cable Having A Flexible Former
Hughey, Raburn L.; Sinha, Uday K.; Reece, David S.; Muller, Albert C.
2005-08-30
In order to provide a flexible oxide superconducting cable which is reduced in AC loss, tape-shaped superconducting wires covered with a stabilizing metal are wound on a flexible former. The superconducting wires are preferably laid on the former at a bending strain of not more than 0.2%. In laying on the former, a number of tape-shaped superconducting wires are laid on a core member in a side-by-side manner, to form a first layer. A prescribed number of tape-shaped superconducting wires are laid on top of the first layer in a side-by-side manner, to form a second layer. The former may be made of a metal, plastic, reinforced plastic, polymer, or a composite and provides flexibility to the superconducting wires and the cable formed therewith.
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire... current carrying capacity for the circuit in which they are used; (2) Be installed in a manner to avoid or...
7 CFR 1755.501 - Definitions applicable to §§ 1755.501 through 1755.510.
Code of Federal Regulations, 2013 CFR
2013-01-01
... in the ANSI/NFPA 70-1999, NEC ®: A fine gauge section of wire or cable that serves as a fuse (that is... telecommunications cable and wire plant, and protective devices. (Reprinted with permission from NFPA 70-1999, the.../code_of_federal_regulations/ibr_locations.html. AWG. American Wire Gauge. BET. Building entrance...
7 CFR 1755.501 - Definitions applicable to §§ 1755.501 through 1755.510.
Code of Federal Regulations, 2012 CFR
2012-01-01
... in the ANSI/NFPA 70-1999, NEC ®: A fine gauge section of wire or cable that serves as a fuse (that is... telecommunications cable and wire plant, and protective devices. (Reprinted with permission from NFPA 70-1999, the.../code_of_federal_regulations/ibr_locations.html. AWG. American Wire Gauge. BET. Building entrance...
7 CFR 1755.501 - Definitions applicable to §§ 1755.501 through 1755.510.
Code of Federal Regulations, 2014 CFR
2014-01-01
... in the ANSI/NFPA 70-1999, NEC ®: A fine gauge section of wire or cable that serves as a fuse (that is... telecommunications cable and wire plant, and protective devices. (Reprinted with permission from NFPA 70-1999, the.../code_of_federal_regulations/ibr_locations.html. AWG. American Wire Gauge. BET. Building entrance...
Dunne, Ben; Murphy, Mark; Skiba, Rohen; Wang, Xiao; Ho, Kwok; Larbalestier, Robert; Merry, Christopher
2016-05-01
Deep sternal wound infection is a devastating complication of cardiac surgery. In the current era of increasing patient comorbidity, newer techniques must be evaluated in attempts to reduce the rates of deep sternal wound infection. A randomized controlled trial comparing sternal closure with traditional sternal wires in figure-8 formation with the Pioneer cabling system® from Medigroup after adult cardiac surgery was performed. A total of 273 patients were enrolled with 137 and 135 patients randomized to sternal wires and cables group, respectively. Baseline characteristics between the two groups were well balanced. Deep sternal wound infection occurred in 0.7% of patients in the wires group and 3.7% of patients in the cables group (absolute risk difference = -3.0%, 95% confidence interval: -7.7 to 0.9%; P = 0.12). Patients in the cables group were extubated slightly earlier than those in the sternal wires group postoperatively (9.7 vs 12.8 h; P = 0.03). There was, however, no significant difference in hospital and follow-up pain scores or analgesia requirements. The Pioneer sternal cabling system appears to facilitate early extubation after adult cardiac surgery, but it does not reduce the rate of deep sternal infectionAustralian New Zealand Clinical Trials Registry: ANZCTR-ACTRN12615000973516. © The Author 2016. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.
Cemented total hip replacement cable debris and acetabular construct durability.
Altenburg, Aaron J; Callaghan, John J; Yehyawi, Tameem M; Pedersen, Douglas R; Liu, Steve S; Leinen, Jessica A; Dahl, Kevin A; Goetz, Devon D; Brown, Thomas D; Johnston, Richard C
2009-07-01
Third-body wear can adversely affect the outcome of total hip arthroplasty by causing increased polyethylene wear, osteolysis, and component loosening. We hypothesized that there would be greater generation and migration of metal debris to the bearing surfaces in hips in which cobalt-chromium cables were used to reattach the osteotomized greater trochanter when compared with hips in which stainless steel wires were used. Between June 1981 and December 1983, 196 consecutive total hip arthroplasties were performed with use of an Iowa stem and a titanium-backed cemented acetabular component, with cobalt-chromium cable trochanteric reattachment. After nineteen to twenty years of follow-up, the patients were evaluated with regard to the depth of head penetration into the polyethylene (as a surrogate for wear), osteolysis, loosening, and the need for revision. The results were compared with those for a series of 304 total hip arthroplasties that were performed by the same surgeon from January 1984 to December 1985 with use of the same components and the same surgical technique, but with stainless steel wire trochanteric reattachment. The two groups had a comparable nineteen to twenty-year follow-up. All living patients (fifty-nine hips in the cable group and ninety-two hips in the wire group) had minimum ten-year follow-up radiographs. The polyethylene wear rate was 0.101 mm/yr for the cable group and 0.082 mm/yr for the wire group (p = 0.039). For the living patients, the rate of revision of the acetabular component because of aseptic loosening was 37.3% (twenty-two hips) for the cable group and 20.7% (nineteen hips) for the wire group (p = 0.025). The rate of acetabular osteolysis was 44% (twenty-six hips) for the cable group and 26% (twenty-four hips) for the wire group (p = 0.022). Kaplan-Meier analysis with revision of the acetabular component because of aseptic loosening as the end point demonstrated survival rates of 73.7% +/- 9% and 83% +/- 7% for the cable and wire groups, respectively, at twenty years (p = 0.03). Because cable trochanteric attachment led to significantly greater polyethylene wear, osteolysis, acetabular loosening, and acetabular revision, presumably due to third-body metallic debris generation in this cemented total hip replacement construct, surgeons should be aware of the deleterious effects of third-body debris and avoid the use of potential debris generators in the total hip arthroplasty construct. If cable is used and fretting is recognized, especially with intra-articular migration of metallic material or nonunion of the greater trochanter, consideration should be given to cable removal.
Kitanovic, Smiljka; Ames, Peter; Parkinson, John S.
2011-01-01
During transmembrane signaling by Escherichia coli Tsr, changes in ligand occupancy in the periplasmic serine-binding domain promote asymmetric motions in a four-helix transmembrane bundle. Piston displacements of the signaling TM2 helix in turn modulate the HAMP bundle on the cytoplasmic side of the membrane to control receptor output signals to the flagellar motors. A five-residue control cable joins TM2 to the HAMP AS1 helix and mediates conformational interactions between them. To explore control cable structural features important for signal transmission, we constructed and characterized all possible single amino acid replacements at the Tsr control cable residues. Only a few lesions abolished Tsr function, indicating that the chemical nature and size of the control cable side chains are not individually critical for signal control. Charged replacements at I214 mimicked the signaling consequences of attractant or repellent stimuli, most likely through aberrant structural interactions of the mutant side chains with the membrane interfacial environment. Prolines at residues 214 to 217 also caused signaling defects, suggesting that the control cable has helical character. However, proline did not disrupt function at G213, the first control cable residue, which might serve as a structural transition between the TM2 and AS1 helix registers. Hydrophobic amino acids at S217, the last control cable residue, produced attractant-mimic effects, most likely by contributing to packing interactions within the HAMP bundle. These results suggest a helix extension mechanism of Tsr transmembrane signaling in which TM2 piston motions influence HAMP stability by modulating the helicity of the control cable segment. PMID:21803986
Report on Investigations of Aviation Wires and Cables, Their Fastenings and Terminal Connections
NASA Technical Reports Server (NTRS)
Sunderlang, C C; Horn, H J; Green, D
1917-01-01
Report presents results that show that it is possible to furnish efficient terminal connections that would allow for repairs for aviation wires and cables and eliminate the use of acid solder and blow torch.
Wang, Sou-Tien
1994-11-01
A wire cable assembly (10, 310) adapted for the winding of electrical coils is taught. A primary intended use is for use in particle tube assemblies (532) for the superconducting super collider. The correction coil cables (10, 310) have wires (14, 314) collected in wire arrays (12, 312) with a center rib (16, 316) sandwiched therebetween to form a core assembly (18, 318 ). The core assembly (18, 318) is surrounded by an assembly housing (20, 320) having an inner spiral wrap (22, 322) and a counter wound outer spiral wrap (24, 324). An alternate embodiment (410) of the invention is rolled into a keystoned shape to improve radial alignment of the correction coil cable (410) on a particle tube (733) in a particle tube assembly (732).
Code of Federal Regulations, 2010 CFR
2010-10-01
... AND RESERVES FOR TELECOMMUNICATIONS COMPANIES 1 Telecommunications Property Cable and Wire Facilities § 36.151 General. (a) Cable and Wire Facilities, Account 2410, includes the following types of... cost of the facilities so identified. Because of variations among companies in the character of the...
A momentum source model for wire-wrapped rod bundles—Concept, validation, and application
Hu, Rui; Fanning, Thomas H.
2013-06-19
Large uncertainties still exist in the treatment of wire-spacers and drag models for momentum transfer in current lumped parameter models. Here, to improve the hydraulic modeling of wire-wrap spacers in a rod bundle, a three-dimensional momentum source model (MSM) has been developed to model the anisotropic flow without the need to resolve the geometric details of the wire-wraps. The MSM is examined for 7-pin and 37-pin bundles steady-state simulations using the commercial CFD code STAR-CCM+. The calculated steady-state inter-subchannel cross flow velocities match very well in comparisons between bare bundles with the MSM applied and the wire-wrapped bundles with explicitmore » geometry. The validity of the model is further verified by mesh and parameter sensitivity studies. Furthermore, the MSM is applied to a 61-pin EBR-II experimental subassembly for both steady state and PLOF transient simulations. Reasonably accurate predictions of temperature, pressure, and fluid flow velocities have been achieved using the MSM for both steady-state and transient conditions. Significant computing resources are saved with the MSM since it can be used on a much coarser computational mesh.« less
Space Station Freedom secondary power wiring requirements
NASA Technical Reports Server (NTRS)
Sawyer, C. R.
1994-01-01
Secondary power is produced by DDCU's (direct current to direct current converter units) and routed to and through secondary power distribution assemblies (SPDA's) to loads or tertiary distribution assemblies. This presentation outlines requirements of Space Station Freedom (SSF) EEE (electrical, electronic, and electromechanical) parts wire and the approved electrical wire and cable. The SSF PDRD (Program Definition and Requirements Document) language problems and resolution are reviewed. The cable routing to and from the SPDA's is presented as diagrams and the wire recommendations and characteristics are given.
Equipment testing with damped sinewaves between 1 and 50 MHz
NASA Astrophysics Data System (ADS)
Hardwick, C. John; Baldwin, R. E.
1992-11-01
Present lightning equipment test standards such as RTCA DO160C call for damped sinusoidal tests at 1 and 10 MHz. There has been some discussion in the lightning community about extending these tests to 50 frequencies in the region 1-50 MHz. This paper presents characteristics of such tests on cable bundles and notes the relationship between bundle current and injected voltage; important parameters are the cable loss and Q of the driving waveform.
Skau, Colleen T; Courson, David S; Bestul, Andrew J; Winkelman, Jonathan D; Rock, Ronald S; Sirotkin, Vladimir; Kovar, David R
2011-07-29
Through the coordinated action of diverse actin-binding proteins, cells simultaneously assemble actin filaments with distinct architectures and dynamics to drive different processes. Actin filament cross-linking proteins organize filaments into higher order networks, although the requirement of cross-linking activity in cells has largely been assumed rather than directly tested. Fission yeast Schizosaccharomyces pombe assembles actin into three discrete structures: endocytic actin patches, polarizing actin cables, and the cytokinetic contractile ring. The fission yeast filament cross-linker fimbrin Fim1 primarily localizes to Arp2/3 complex-nucleated branched filaments of the actin patch and by a lesser amount to bundles of linear antiparallel filaments in the contractile ring. It is unclear whether Fim1 associates with bundles of parallel filaments in actin cables. We previously discovered that a principal role of Fim1 is to control localization of tropomyosin Cdc8, thereby facilitating cofilin-mediated filament turnover. Therefore, we hypothesized that the bundling ability of Fim1 is dispensable for actin patches but is important for the contractile ring and possibly actin cables. By directly visualizing actin filament assembly using total internal reflection fluorescence microscopy, we determined that Fim1 bundles filaments in both parallel and antiparallel orientations and efficiently bundles Arp2/3 complex-branched filaments in the absence but not the presence of actin capping protein. Examination of cells exclusively expressing a truncated version of Fim1 that can bind but not bundle actin filaments revealed that bundling activity of Fim1 is in fact important for all three actin structures. Therefore, fimbrin Fim1 has diverse roles as both a filament "gatekeeper" and as a filament cross-linker.
Cemented Total Hip Replacement Cable Debris and Acetabular Construct Durability
Altenburg, Aaron J.; Callaghan, John J.; Yehyawi, Tameem M.; Pedersen, Douglas R.; Liu, Steve S.; Leinen, Jessica A.; Dahl, Kevin A.; Goetz, Devon D.; Brown, Thomas D.; Johnston, Richard C.
2009-01-01
Background: Third-body wear can adversely affect the outcome of total hip arthroplasty by causing increased polyethylene wear, osteolysis, and component loosening. We hypothesized that there would be greater generation and migration of metal debris to the bearing surfaces in hips in which cobalt-chromium cables were used to reattach the osteotomized greater trochanter when compared with hips in which stainless steel wires were used. Methods: Between June 1981 and December 1983, 196 consecutive total hip arthroplasties were performed with use of an Iowa stem and a titanium-backed cemented acetabular component, with cobalt-chromium cable trochanteric reattachment. After nineteen to twenty years of follow-up, the patients were evaluated with regard to the depth of head penetration into the polyethylene (as a surrogate for wear), osteolysis, loosening, and the need for revision. The results were compared with those for a series of 304 total hip arthroplasties that were performed by the same surgeon from January 1984 to December 1985 with use of the same components and the same surgical technique, but with stainless steel wire trochanteric reattachment. The two groups had a comparable nineteen to twenty-year follow-up. All living patients (fifty-nine hips in the cable group and ninety-two hips in the wire group) had minimum ten-year follow-up radiographs. Results: The polyethylene wear rate was 0.101 mm/yr for the cable group and 0.082 mm/yr for the wire group (p = 0.039). For the living patients, the rate of revision of the acetabular component because of aseptic loosening was 37.3% (twenty-two hips) for the cable group and 20.7% (nineteen hips) for the wire group (p = 0.025). The rate of acetabular osteolysis was 44% (twenty-six hips) for the cable group and 26% (twenty-four hips) for the wire group (p = 0.022). Kaplan-Meier analysis with revision of the acetabular component because of aseptic loosening as the end point demonstrated survival rates of 73.7% ± 9% and 83% ± 7% for the cable and wire groups, respectively, at twenty years (p = 0.03). Conclusions: Because cable trochanteric attachment led to significantly greater polyethylene wear, osteolysis, acetabular loosening, and acetabular revision, presumably due to third-body metallic debris generation in this cemented total hip replacement construct, surgeons should be aware of the deleterious effects of third-body debris and avoid the use of potential debris generators in the total hip arthroplasty construct. If cable is used and fretting is recognized, especially with intra-articular migration of metallic material or nonunion of the greater trochanter, consideration should be given to cable removal. Level of Evidence: Therapeutic Level III. See Instructions to Authors for a complete description of levels of evidence. PMID:19571089
Hall, David R [Provo, UT; Hall, Jr., H. Tracy
2007-07-24
A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.
Detail of the underground wire net mat and cable at ...
Detail of the underground wire net mat and cable at the base of a 94' low-band reflector screen pole, view facing north - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI
Coronal plasma development in wire-array z-pinches made of twisted-pairs
NASA Astrophysics Data System (ADS)
Hoyt, C. L.; Greenly, J. B.; Gourdain, P. A.; Knapp, P. F.; Pikuz, S. A.; Shelkovenko, T. A.; Hammer, D. A.; Kusse, B. R.
2009-11-01
We have investigated coronal and core plasma development in wire array z-pinches in which single fine wires are replaced by twisted-pairs (``cable'') on the 1 MA, 100 ns rise time COBRA pulsed power generator. X-ray radiography, employed to investigate dense wire core expansion, showed periodic axial nonuniformity and evidence for shock waves developing where the individual wire plasmas collide. Laser shadowgraphy images indicated that the axial instability properties of the coronal plasma are substantially modified from ordinary wire arrays. Cable mass per unit length, material and the twist wavelength were varied in order to study their effects upon the instability wavelength. Implosion uniformity and bright-spot formation, as well as magnetic topology evolution, have also been investigated using self-emission imaging, x-ray diagnostics and small B-dot probes, respectively. Results from the cable-array z-pinches will be compared with results from ordinary wire-array z-pinches. This research was supported by the SSAA program of the National Nuclear Security Administration under DOE Cooperative agreement DE-FC03-02NA00057.
Tactical Vehicle Climate Control Testing
2017-03-31
MIL-STD-810G CN1. The greatest care must be taken to monitor this parameter during periods where the vehicle engine is running while in the chamber...a drain plug, wire pass-through, or the gunner’s hatch that can remain closed throughout testing to prevent damaging the cables. Avoid running ...drain plug, wire pass-through, or the gunner’s hatch, that can remain closed throughout testing to prevent damaging the cables. Avoid running cables
Metal clad aramid fibers for aerospace wire and cable
NASA Technical Reports Server (NTRS)
Tokarsky, Edward W.; Dunham, Michael G.; Hunt, James E.; Santoleri, E. David; Allen, David B.
1995-01-01
High strength light weight metal clad aramid fibers can provide significant weight savings when used to replace conventional metal wire in aerospace cable. An overview of metal clad aramid fiber materials and information on performance and use in braided electrical shielding and signal conductors is provided.
47 CFR 76.1514 - Bundling of video and local exchange services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Bundling of video and local exchange services... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1514 Bundling of video and local exchange services. An open video system operator may offer video and local exchange...
47 CFR 76.1514 - Bundling of video and local exchange services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Bundling of video and local exchange services... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1514 Bundling of video and local exchange services. An open video system operator may offer video and local exchange...
47 CFR 76.1514 - Bundling of video and local exchange services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Bundling of video and local exchange services... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1514 Bundling of video and local exchange services. An open video system operator may offer video and local exchange...
47 CFR 76.1514 - Bundling of video and local exchange services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Bundling of video and local exchange services... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1514 Bundling of video and local exchange services. An open video system operator may offer video and local exchange...
47 CFR 76.1514 - Bundling of video and local exchange services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Bundling of video and local exchange services... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1514 Bundling of video and local exchange services. An open video system operator may offer video and local exchange...
Warren, P J; Thompson, P; Fletcher, M D A
2002-12-01
The Wagner SL uncemented revision stem has been utilised successfully for revision hip surgery where marked loss of proximal bone stock co-exists or where there is a periprosthetic fracture. Implanted via the transfemoral approach, one significant difficulty appears to be a tendency for implant subsidence, which in some cases has been troublesome enough to necessitate early revision (usually to a larger prosthesis). A change in our operative practice allowed us to review the effects of using either wire cerclages or 2.0 mm Dall-Miles cables for prophylactic wiring of the distal femur. Seventeen Wagner SL stems, inserted via the transfemoral approach, were studied in 16 patients. We found those patients prophylactically wired with Dall-Miles cables demonstrated no subsidence in comparison with those in whom heavy wire cerclage had been utilised (mean subsidence 6 mm; p=0.001). In addition, we found that closure of the proximal osteotomy with wires conferred a more reliable rate of union in comparison with those closed with heavy sutures. We recommend the use of Dall-Miles cables for distal cerclage and osteotomy closure for the Wagner prosthesis.
2009-07-01
Breaks in the internal wires of reusable electrosurgical active electrode cables can increase the risk of injuries and surgical fires. Careful visual and manual inspection during reprocessing and immediately before use, coupled with periodic replacement, can help limit the risk.
DOT National Transportation Integrated Search
2013-09-01
Cable-stayed bridges have been increasingly used as river-crossing links in highway and railway transportation networks. In the event : of an abnormal situation, they can not only impact the local and national economy but also threaten the safety of ...
Zhou, Qin; Ames, Peter; Parkinson, John S.
2009-01-01
SUMMARY To test the gearbox model of HAMP signaling in the E. coli serine receptor, Tsr, we generated a series of amino acid replacements at each residue of the AS1 and AS2 helices. The residues most critical for Tsr function defined hydrophobic packing faces consistent with a 4-helix bundle. Suppression patterns of helix lesions conformed to the the predicted packing layers in the bundle. Although the properties and patterns of most AS1 and AS2 lesions were consistent with both proposed gearbox structures, some mutational features specifically indicate the functional importance of an x-da bundle over an alternative a-d bundle. These genetic data suggest that HAMP signaling could simply involve changes in the stability of its x-da bundle. We propose that Tsr HAMP controls output signals by modulating destabilizing phase clashes between the AS2 helices and the adjoining kinase control helices. Our model further proposes that chemoeffectors regulate HAMP bundle stability through a control cable connection between the transmembrane segments and AS1 helices. Attractant stimuli, which cause inward piston displacements in chemoreceptors, should reduce cable tension, thereby stabilizing the HAMP bundle. This study shows how transmembrane signaling and HAMP input-output control could occur without the helix rotations central to the gearbox model. PMID:19656294
Code of Federal Regulations, 2012 CFR
2012-07-01
... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...
Code of Federal Regulations, 2014 CFR
2014-07-01
... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...
Code of Federal Regulations, 2013 CFR
2013-07-01
... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...
Noise propagation issues in Belle II pixel detector power cable
NASA Astrophysics Data System (ADS)
Iglesias, M.; Arteche, F.; Echeverria, I.; Pradas, A.; Rivetta, C.; Moser, H.-G.; Kiesling, C.; Rummel, S.; Arcega, F. J.
2018-04-01
The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This paper presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impact on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.
Ultrastrong Graphene-Copper Core-Shell Wires for High-Performance Electrical Cables.
Kim, Sang Jin; Shin, Dong Heon; Choi, Yong Seok; Rho, Hokyun; Park, Min; Moon, Byung Joon; Kim, Youngsoo; Lee, Seuoung-Ki; Lee, Dong Su; Kim, Tae-Wook; Lee, Sang Hyun; Kim, Keun Soo; Hong, Byung Hee; Bae, Sukang
2018-03-27
Recent development in mobile electronic devices and electric vehicles requires electrical wires with reduced weight as well as enhanced stability. In addition, since electric energy is mostly generated from power plants located far from its consuming places, mechanically stronger and higher electric power transmission cables are strongly demanded. However, there has been no alternative materials that can practically replace copper materials. Here, we report a method to prepare ultrastrong graphene fibers (GFs)-Cu core-shell wires with significantly enhanced electrical and mechanical properties. The core GFs are synthesized by chemical vapor deposition, followed by electroplating of Cu shells, where the large surface area of GFs in contact with Cu maximizes the mechanical toughness of the core-shell wires. At the same time, the unique electrical and thermal characteristics of graphene allow a ∼10 times higher current density limit, providing more efficient and reliable delivery of electrical energies through the GFs-Cu wires. We believe that our results would be useful to overcome the current limit in electrical wires and cables for lightweight, energy-saving, and high-power applications.
NASA Hybrid Reflectometer Project
NASA Technical Reports Server (NTRS)
Lynch, Dana; Mancini, Ron (Technical Monitor)
2002-01-01
Time-domain and frequency-domain reflectometry have been used for about forty years to locate opens and shorts in cables. Interpretation of reflectometry data is as much art as science. Is there information in the data that is being missed? Can the reflectometers be improved to allow us to detect and locate defects in cables that are not outright shorts or opens? The Hybrid Reflectometer Project was begun this year at NASA Ames Research Center, initially to model wire physics, simulating time-domain reflectometry (TDR) signals in those models and validating the models against actual TDR data taken on testbed cables. Theoretical models of reflectometry in wires will give us an understanding of the merits and limits of these techniques and will guide the application of a proposed hybrid reflectometer with the aim of enhancing reflectometer sensitivity to the point that wire defects can be detected. We will point out efforts by some other researchers to apply wire physics models to the problem of defect detection in wires and we will describe our own initial efforts to create wire physics models and report on testbed validation of the TDR simulations.
Cabling design of booster and storage ring construction progress of TPS
NASA Astrophysics Data System (ADS)
Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, b.-S.
2017-06-01
The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.
Tang, Haosu; Laporte, Damien; Vavylonis, Dimitrios
2014-01-01
The growth of fission yeast relies on the polymerization of actin filaments nucleated by formin For3p, which localizes at tip cortical sites. These actin filaments bundle to form actin cables that span the cell and guide the movement of vesicles toward the cell tips. A big challenge is to develop a quantitative understanding of these cellular actin structures. We used computer simulations to study the spatial and dynamical properties of actin cables. We simulated individual actin filaments as semiflexible polymers in three dimensions composed of beads connected with springs. Polymerization out of For3p cortical sites, bundling by cross-linkers, pulling by type V myosin, and severing by cofilin are simulated as growth, cross-linking, pulling, and turnover of the semiflexible polymers. With the foregoing mechanisms, the model generates actin cable structures and dynamics similar to those observed in live-cell experiments. Our simulations reproduce the particular actin cable structures in myoVΔ cells and predict the effect of increased myosin V pulling. Increasing cross-linking parameters generates thicker actin cables. It also leads to antiparallel and parallel phases with straight or curved cables, consistent with observations of cells overexpressing α-actinin. Finally, the model predicts that clustering of formins at cell tips promotes actin cable formation. PMID:25103242
47 CFR 1.1306 - Actions which are categorically excluded from environmental processing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the installation of aerial wire or cable over existing aerial corridors of prior or permitted use or the underground installation of wire or cable along existing underground corridors of prior or permitted use, established by the applicant or others. The use of existing buildings, towers or corridors is...
47 CFR 36.156 - Interexchange Cable and Wire Facilities (C&WF)-Category 3-apportionment procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... cost per equivalent interexchange telephone circuit kilometer for all circuits in Category 3 is determined and applied to the equivalent interexchange telephone circuit kilometer counts of each of the... Interexchange Cable and Wire Facilities C&WF where feasible. All study areas shall apportion the non-directly...
47 CFR 36.156 - Interexchange Cable and Wire Facilities (C&WF)-Category 3-apportionment procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cost per equivalent interexchange telephone circuit kilometer for all circuits in Category 3 is determined and applied to the equivalent interexchange telephone circuit kilometer counts of each of the... Interexchange Cable and Wire Facilities C&WF where feasible. All study areas shall apportion the non-directly...
47 CFR 36.156 - Interexchange Cable and Wire Facilities (C&WF)-Category 3-apportionment procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... cost per equivalent interexchange telephone circuit kilometer for all circuits in Category 3 is determined and applied to the equivalent interexchange telephone circuit kilometer counts of each of the... Interexchange Cable and Wire Facilities C&WF where feasible. All study areas shall apportion the non-directly...
47 CFR 36.156 - Interexchange Cable and Wire Facilities (C&WF)-Category 3-apportionment procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... cost per equivalent interexchange telephone circuit kilometer for all circuits in Category 3 is determined and applied to the equivalent interexchange telephone circuit kilometer counts of each of the... Interexchange Cable and Wire Facilities C&WF where feasible. All study areas shall apportion the non-directly...
Embrittlement phenomenon of Ag core MP35N cable as lead conductor in medical device.
Wang, Ling; Li, Bernie; Zhang, Haitao
2013-02-01
Ag core MP35N (Ag/MP35N) wire has been used in lead electric conductor wires in the medical device industry for many years. Recently it was noticed that the combination of silver and MP35N restricts its wire drawing process. The annealing temperature in Ag/MP35N has to be lower than the melting temperature of pure Ag (960 °C), which cannot fully anneal MP35N. The lower annealing temperature results in a highly cold worked MP35N, which significantly reduces Ag/MP35N ductility. The embrittlement phenomenon of Ag/MP35N cable was observed in tension and bending deformation. The effect of the embrittlement on the wire flex fatigue life was evaluated using a newly developed flex fatigue testing method. The Ag/MP35N cable fatigue results was analyzed with a Coffin-Manson approach and compared to the MP35N cable fatigue results. The root causes of the Ag/Mp35N embrittlement phenomenon are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.
Online Cable Tester and Rerouter
NASA Technical Reports Server (NTRS)
Lewis, Mark; Medelius, Pedro
2012-01-01
Hardware and algorithms have been developed to transfer electrical power and data connectivity safely, efficiently, and automatically from an identified damaged/defective wire in a cable to an alternate wire path. The combination of online cable testing capabilities, along with intelligent signal rerouting algorithms, allows the user to overcome the inherent difficulty of maintaining system integrity and configuration control, while autonomously rerouting signals and functions without introducing new failure modes. The incorporation of this capability will increase the reliability of systems by ensuring system availability during operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dearing, J F; Rose, S D; Nelson, W R
The predicted computational results of two well-known sub-channel analysis codes, COBRA-III-C and SABRE-I (wire wrap version), have been evaluated by comparison with steady state temperature data from the THORS Facility at ORNL. Both codes give good predictions of transverse and axial temperatures when compared with wire wrap thermocouple data. The crossflow velocity profiles predicted by these codes are similar which is encouraging since the wire wrap models are based on different assumptions.
Sixty-four-Channel Inline Cable Tester
NASA Technical Reports Server (NTRS)
2008-01-01
Faults in wiring are a serious concern for the aerospace and aeronautics (commercial, military, and civil) industries. A number of accidents have occurred because faulty wiring created shorts or opens that resulted in the loss of control of the aircraft or because arcing led to fires and explosions. Some of these accidents have resulted in the massive loss of lives (such as in the TWA Flight 800 accident). Circuits on the Space Shuttle have also failed because of faulty insulation on wiring. STS-93 lost power when a primary power circuit in one engine failed and a second engine had a backup power circuit fault. Cables are usually tested on the ground after the crew reports a fault encountered during flight. Often such failures result from vibration and cannot be replicated while the aircraft is stationary. It is therefore important to monitor faults while the aircraft is in operation, when cables are more likely to fail. Work is in progress to develop a cable fault tester capable of monitoring up to 64 individual wires simultaneously. Faults can be monitored either inline or offline. In the inline mode of operation, the monitoring is performed without disturbing the normal operation of the wires under test. That is, the operations are performed unintrusively and are essentially undetectable for the test signal levels are below the noise floor. A cable can be monitored several times per second in the offline mode and once a second in the inline mode. The 64-channel inline cable tester not only detects the occurrence of a fault, but also determines the type of fault (short/open) and the location of the fault. This will enable the detection of intermittent faults that can be repaired before they become serious problems.
76 FR 62653 - Airworthiness Directives; Airbus Model A310 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... the fuel electrical circuit in the Right Hand (RH) wing must be modified in order to ensure better... 2S of the fuel electrical circuit in the Right Hand (RH) wing must be modified in order to ensure... the wire bundle 2S in the RH wing pylon area to the generator wire bundle of engine 2. The...
75 FR 74663 - Airworthiness Directives; The Boeing Company Model 747-400 and -400D Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... number three engine pylons near the leading edge, and related investigative and corrective actions, if... routing of the wire bundles in the number two and number three engine pylons near the leading edge, and... routing of the wire bundles in the number two and number three engine pylons near the leading edge; and do...
Lightweight electrical connector split backshell
NASA Technical Reports Server (NTRS)
Goldman, Elliot (Inventor)
2009-01-01
An electrical connector split backshell is provided, comprising two substantially identical backshell halves. Each half includes a first side and a cam projecting therefrom along an axis perpendicular thereto, the cam having an alignment tooth with a constant radius and an engagement section with a radius that increases with angular distance from the alignment tooth. Each half further includes a second side parallel to the first side and a circular sector opening disposed in the second side, the circular sector opening including an inner surface configured as a ramp with a constant radius, the ramp being configured to engage with an engagement section of a cam of the other half, the circular sector opening further including a relieved pocket configured to receive an alignment tooth of the cam of the other half. Each half further includes a back side perpendicular to the first and second sides and a wire bundle notch disposed in the back side, the wire bundle notch configured to align with a wire bundle notch of the other half to form a wire bundle opening. The two substantially identical halves are rotatably coupled by engaging the engagement section of each half to the ramp of the other half.
Structure and Growth of Quasi One-Dimensional YSi2 Nanophases on Si(100)
Iancu, V.; Kent, P.R.C.; Hus, S.; Hu, H.; Zeng, C.G.; Weitering, H.H.
2013-01-01
Quasi one-dimensional YSi2 nanostructures are formed via self-assembly on the Si(100) surface. These epitaxial nanowires are metastable and their formation strongly depends on the growth parameters. Here, we explore the various stages of yttrium silicide formation over a range of metal coverages and growth temperatures, and establish a rudimentary phase diagram for these novel and often coexisting nanophases. In addition to previously identified stoichiometric wires, we identify several new nanowire systems. These nanowires exhibit a variety of surface reconstructions, which sometimes coexist on a single wire. From a comparison of scanning tunneling microcopy images, tunneling spectra, and first-principles density functional theory calculations, we determine that these surface reconstructions arise from local orderings of yttrium vacancies. Nanowires often agglomerate into nanowire bundles, the thinnest of which are formed by single wire pairs. The calculations show that such bundles are energetically favored compared to well-separated single wires. Thicker bundles are formed at slightly higher temperature. They extend over several microns, forming a robust network of conducting wires that could possibly be employed in nanodevice applications. PMID:23221350
Li, Dongsheng; Yang, Wei; Zhang, Wenyao
2017-05-01
Stress corrosion is the major failure type of bridge cable damage. The acoustic emission (AE) technique was applied to monitor the stress corrosion process of steel wires used in bridge cable structures. The damage evolution of stress corrosion in bridge cables was obtained according to the AE characteristic parameter figure. A particle swarm optimization cluster method was developed to determine the relationship between the AE signal and stress corrosion mechanisms. Results indicate that the main AE sources of stress corrosion in bridge cables included four types: passive film breakdown and detachment of the corrosion product, crack initiation, crack extension, and cable fracture. By analyzing different types of clustering data, the mean value of each damage pattern's AE characteristic parameters was determined. Different corrosion damage source AE waveforms and the peak frequency were extracted. AE particle swarm optimization cluster analysis based on principal component analysis was also proposed. This method can completely distinguish the four types of damage sources and simplifies the determination of the evolution process of corrosion damage and broken wire signals. Copyright © 2017. Published by Elsevier B.V.
Long-Term Effects of Soldering By-Products on Nickel-Coated Copper Wire
NASA Technical Reports Server (NTRS)
Rolin, T. D.; Hodge, R. E.
2008-01-01
An analysis of thirty-year-old, down graded flight cables was conducted to determine the makeup of a green material on the surface of the shielded wire near soldered areas and to ascertain if the green material had corroded the nickel-coated copper wire. Two likely candidates were possible due to the handling and environments to which these cables were exposed. The flux used to solder the cables is known to contain abietic acid, a carboxylic acid found in many pine rosins used for the soldering process. The resulting material copper abietate is green in color and is formed during the application of heat during soldering operations. Copper (II) chloride, which is also green in color is known to contaminate flight parts and is corrosive. Data is presented that shows the material is copper abietate, not copper (II) chloride, and more importantly that the abietate does not aggressively attack nickel-plated copper wire.
Synthesis and magnetic properties of bundled and dispersed Co{sub 3}O{sub 4} nanowires
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, B.B.; Wang, P.F.; Xu, J.C.
Highlights: • Co{sub 3}O{sub 4} nanowires possessed the same diameter and the different interwires distance. • All samples possessed antiferromagnetism and superparamagnetism at high temperature. • The exchange bias effect was observed at low temperature. • The surface spin coupling restrained the surface effect of magnetic nanostructures. - Abstract: The magnetic Co{sub 3}O{sub 4} nanowires were synthesized using the templates of SBA-15, and then the well-dispersed nanowires (D-wires) were separated from the bundled ordered nanowires (B-wires) with the centrifugal technique. TEM images indicated that D-wires were highly dispersed Co{sub 3}O{sub 4} nanowires and B-wires existed in bundles. All samples possessedmore » the antiferromagnetism and superparamagnetism at high temperature. After revealing the intrinsic magnetic properties of Co{sub 3}O{sub 4} nanowires with D-wires, the magnetic behavior of B-wires was discussed in detail, and then the magnetic interaction between neighboring nanowires could be deduced. The exchange bias effect from the body Co{sub 3}O{sub 4} antiferromagnetism and surface ferromagnetism was observed at low temperature. The magnetization of B-wires was higher than that of D-wires, which was attributed to the constraint of the surface spin coupling between the neighboring nanowires to the surface affect of nanostructures.« less
Spring control of wire harness loops
NASA Technical Reports Server (NTRS)
Curcio, P. J.
1979-01-01
Negator spring control guides wire harness between movable and fixed structure. It prevents electrical wire harness loop from jamming or being severed as wire moves in response to changes in position of aircraft rudder. Spring-loaded coiled cable controls wire loop regardless of rudder movement.
46 CFR 111.60-2 - Specialty cable for communication and RF applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-2 Specialty cable for communication and RF applications. Specialty cable such as certain coaxial cable that cannot pass the... 46 Shipping 4 2012-10-01 2012-10-01 false Specialty cable for communication and RF applications...
46 CFR 111.60-2 - Specialty cable for communication and RF applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-2 Specialty cable for communication and RF applications. Specialty cable such as certain coaxial cable that cannot pass the... 46 Shipping 4 2013-10-01 2013-10-01 false Specialty cable for communication and RF applications...
46 CFR 111.60-2 - Specialty cable for communication and RF applications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-2 Specialty cable for communication and RF applications. Specialty cable such as certain coaxial cable that cannot pass the... 46 Shipping 4 2014-10-01 2014-10-01 false Specialty cable for communication and RF applications...
46 CFR 111.60-2 - Specialty cable for communication and RF applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-2 Specialty cable for communication and RF applications. Specialty cable such as certain coaxial cable that cannot pass the... 46 Shipping 4 2010-10-01 2010-10-01 false Specialty cable for communication and RF applications...
46 CFR 111.60-2 - Specialty cable for communication and RF applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-2 Specialty cable for communication and RF applications. Specialty cable such as certain coaxial cable that cannot pass the... 46 Shipping 4 2011-10-01 2011-10-01 false Specialty cable for communication and RF applications...
NASA Technical Reports Server (NTRS)
1998-01-01
With technical assistance from Marshall Space Flight Center and Kennedy Space Center, Protective Cable and Wire developed Lightning Retardant Cable (LRC). LRC improves lightning protection over standard coaxial cable by 100 percent. The LRC design keeps lightning from traveling through the cable, preventing damage to satellites, antennas, and cable systems. LRC is now being used in homes as well as airports.
46 CFR 111.60-5 - Cable installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...
Strain relief for power-cable connectors
NASA Technical Reports Server (NTRS)
Dean, W. T., III
1980-01-01
Easily fabricated grommet composed of polytetrafluoroethylene cylinder, containing U-shaped channels equally spaced around periphery, is used in power cable connectors to relieve strain on cables. Utilization of grommets provides more ease in cable insertion and removal. Potential applications include wiring in large residential and commercial buildings.
NASA Technical Reports Server (NTRS)
1977-01-01
The operation of mechanical and thermal strippers and the early development of laser wire strippers are reviewed. NASA sponsored development of laser wire stripping for space shuttle includes bench-type strippers as well as an advanced portable hand-held stripper which incorporates a miniaturized carbon dioxide laser and a rotating optics unit with a gas-jet assist and debris exhaust. Drives and controls girdle the wire and slit the remaining slug without manual assistance. This unit can strip wire sizes 26 through 12 gage. A larger-capacity hand-held unit for wire sizes through 1/0 gage was built using a neodynium-doped yttrium aluminum garnet (Nd:YAG) laser. The hand-held units have a flexible umbilical cable to an accompanying cart that carries the power supply, gas supply, cooling unit, and the controls.
Quantitative Analysis of Statics and Dynamics of Actin Cables in Fission Yeast
NASA Astrophysics Data System (ADS)
Yusuf, Eddy; Wu, Jian-Qiu; Vavylonis, Dimitrios
2010-03-01
The assembly of actin and tubulin proteins into long filaments and bundles, i.e. closely-packed filaments, underlies important cellular processes such as cell motility, intracellular transport, and cell division. Recent theoretical and experimental work has addressed the nonequilibrium dynamics of single microtubules within live cells [1]. Actin filaments usually form dense networks that prevents microscopic imaging of individual filaments or bundles. Here, we studied actin dynamics using fission yeast that has low-density actin cytoskeleton consisting of actin cables (actin bundles aligned along the long axis of the cell) and ``actin patches.'' Yeast cells expressing GFP-CHD were imaged by 3D confocal microscopy. Stretching open active contours [2] were used to segment and track individual actin cables. We analyzed their curvature distribution, the tangent correlation, and the temporal bending amplitude fluctuations. We contrast our findings to equilibrium fluctuating semiflexible polymers and to microtubules in cells. We calculate the important time and length scales for the actin cables. We also discuss our findings within the broad context of understanding actin assembly in cells. [1] C. P. Brangwynne et. al., Phys. Rev. Lett. 100, 118104 (2008) [2] H. Li et. al., Proc. of the IEEE Int'l Symposium on Biomedical Imaging: From Nano to Macro, ISBI'09
Development of flat conductor cable for commercial and residential wiring
NASA Technical Reports Server (NTRS)
Carden, J. R.
1977-01-01
The overall spectrum of the space technology spin-off development project: development of Flat Conductor Cable (FCC) for commercial and residential wiring, is presented. A discussion of the background, program milestones, industry participants, system outgrowth, hardware availability, cost estimates, and overall status of the program is presented for the 1970-to-present time period.
Hopkins installs wire harnesses
2013-11-24
ISS038-E-008291 (24 Nov. 2013) --- NASA astronaut Michael Hopkins, Expedition 38 flight engineer, installs wire harnesses in the International Space Station?s Harmony node to support the installation of Ethernet video cables for the station?s local area network. These new cables will provide Ethernet connectivity to the visiting vehicles that dock to Harmony?s Earth-facing port.
Testing of a flat conductor cable baseboard system for residential and commercial wiring
NASA Technical Reports Server (NTRS)
Hankins, J. D.
1974-01-01
The results of extensive testing (mechanical, electrical, chemical, environmental, thermal, and analytical) are reported for a flat conductor cable baseboard system for residential and commercial wiring. In all of the tests, Underwriters Laboratories (UL) Standards, UL Tentative Test Programs, or Accepted Engineering Practices were followed during test selection, test setup, and test accomplishment.
Burning Characteristics and Flammability of PVC Cables in Groups
NASA Technical Reports Server (NTRS)
Mikado, T.; Akita, K.
1988-01-01
Because burning cables represent a danger of increasing secondary damage it is of utmost importance for disaster prevention to correctly evaluate the combustion characteristics of cable. However, in many cases cable is laid out in bundles complicating the combustion characteristics. A situation has developed where group cable characteristics are not completely understood. A new method is developed for testing the combustion of high polymer type cable and earlier reports gave comparative combustion measurement results. It was learned that there is considerable difference between the combustion characteristics of the grouped cables and those of single cables. This study is supplemental research concerning the special behavior of group PVC cables, throwing some light on their combustion characteristics.
Super-bridges suspended over carbon nanotube cables
NASA Astrophysics Data System (ADS)
Carpinteri, Alberto; Pugno, Nicola M.
2008-11-01
In this paper the new concept of 'super-bridges', i.e. kilometre-long bridges suspended over carbon nanotube cables, is introduced. The analysis shows that the use of realistic (thus defective) carbon nanotube bundles as suspension cables can enlarge the current limit main span by a factor of ~3. Too large compliance and dynamic self-excited resonances could be avoided by additional strands, rendering the super-bridge anchored as a spider's cobweb. As an example, we have computed the limit main spans of the current existing 19 suspended-deck bridges longer than 1 km assuming them to have substituted their cables with carbon nanotube bundles (thus maintaining the same geometry, with the exception of the length) finding spans of up to ~6.3 km. We thus suggest that the design of the Messina bridge in Italy, which would require a main span of ~3.3 km, could benefit from the use of carbon nanotube bundles. We believe that their use represents a feasible and economically convenient solution. The plausibility of these affirmations is confirmed by a statistical analysis of the existing 100 longest suspended bridges, which follow a Zipf's law with an exponent of 1.1615: we have found a Moore-like (i.e. exponential) law, in which the doubling of the capacity (here the main span) per year is substituted by the factor 1.0138. Such a law predicts that the realization of the Messina bridge using conventional materials will only occur around the middle of the present century, whereas it could be expected in the near future if carbon nanotube bundles were used. A simple cost analysis concludes the paper.
Cable TV: The Re-regulation, Re-wiring, and Re-education of America.
ERIC Educational Resources Information Center
Nelson, Milo
1992-01-01
Discusses federal regulation of cable television. Topics addressed include Congressional legislation; Federal Communications Commission (FCC) guidelines; pricing; conflicts between broadcasters and the cable industry; the telephone industry's entrance into the cable market; and possible effects of regulatory changes on educational television. (LRW)
Myosin Vs organize actin cables in fission yeast
Lo Presti, Libera; Chang, Fred; Martin, Sophie G.
2012-01-01
Myosin V motors are believed to contribute to cell polarization by carrying cargoes along actin tracks. In Schizosaccharomyces pombe, Myosin Vs transport secretory vesicles along actin cables, which are dynamic actin bundles assembled by the formin For3 at cell poles. How these flexible structures are able to extend longitudinally in the cell through the dense cytoplasm is unknown. Here we show that in myosin V (myo52 myo51) null cells, actin cables are curled, bundled, and fail to extend into the cell interior. They also exhibit reduced retrograde flow, suggesting that formin-mediated actin assembly is impaired. Myo52 may contribute to actin cable organization by delivering actin regulators to cell poles, as myoV∆ defects are partially suppressed by diverting cargoes toward cell tips onto microtubules with a kinesin 7–Myo52 tail chimera. In addition, Myo52 motor activity may pull on cables to provide the tension necessary for their extension and efficient assembly, as artificially tethering actin cables to the nuclear envelope via a Myo52 motor domain restores actin cable extension and retrograde flow in myoV mutants. Together these in vivo data reveal elements of a self-organizing system in which the motors shape their own tracks by transporting cargoes and exerting physical pulling forces. PMID:23051734
Myosin Vs organize actin cables in fission yeast.
Lo Presti, Libera; Chang, Fred; Martin, Sophie G
2012-12-01
Myosin V motors are believed to contribute to cell polarization by carrying cargoes along actin tracks. In Schizosaccharomyces pombe, Myosin Vs transport secretory vesicles along actin cables, which are dynamic actin bundles assembled by the formin For3 at cell poles. How these flexible structures are able to extend longitudinally in the cell through the dense cytoplasm is unknown. Here we show that in myosin V (myo52 myo51) null cells, actin cables are curled, bundled, and fail to extend into the cell interior. They also exhibit reduced retrograde flow, suggesting that formin-mediated actin assembly is impaired. Myo52 may contribute to actin cable organization by delivering actin regulators to cell poles, as myoV defects are partially suppressed by diverting cargoes toward cell tips onto microtubules with a kinesin 7-Myo52 tail chimera. In addition, Myo52 motor activity may pull on cables to provide the tension necessary for their extension and efficient assembly, as artificially tethering actin cables to the nuclear envelope via a Myo52 motor domain restores actin cable extension and retrograde flow in myoV mutants. Together these in vivo data reveal elements of a self-organizing system in which the motors shape their own tracks by transporting cargoes and exerting physical pulling forces.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dearing, J F; Nelson, W R; Rose, S D
Computational thermal-hydraulic models of a 19-pin, electrically heated, wire-wrap liquid-metal fast breeder reactor test bundle were developed using two well-known subchannel analysis codes, COBRA III-C and SABRE-1 (wire-wrap version). These two codes use similar subchannel control volumes for the finite difference conservation equations but vary markedly in solution strategy and modeling capability. In particular, the empirical wire-wrap-forced diversion crossflow models are different. Surprisingly, however, crossflow velocity predictions of the two codes are very similar. Both codes show generally good agreement with experimental temperature data from a test in which a large radial temperature gradient was imposed. Differences between data andmore » code results are probably caused by experimental pin bowing, which is presently the limiting factor in validating coded empirical models.« less
46 CFR 111.60-4 - Minimum cable conductor size.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-4 Minimum cable conductor size. Each cable conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...
46 CFR 111.60-4 - Minimum cable conductor size.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-4 Minimum cable conductor size. Each cable conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...
46 CFR 111.60-23 - Metal-clad (Type MC) cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Metal-clad (Type MC) cable. 111.60-23 Section 111.60-23...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-23 Metal-clad (Type MC) cable. (a) Metal-clad (Type MC) cable permitted on board a vessel must be continuous corrugated metal-clad cable. (b) The...
46 CFR 111.60-23 - Metal-clad (Type MC) cable.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Metal-clad (Type MC) cable. 111.60-23 Section 111.60-23...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-23 Metal-clad (Type MC) cable. (a) Metal-clad (Type MC) cable permitted on board a vessel must be continuous corrugated metal-clad cable. (b) The...
Correlating electronic transport to atomic structures in self-assembled quantum wires.
Qin, Shengyong; Kim, Tae-Hwan; Zhang, Yanning; Ouyang, Wenjie; Weitering, Hanno H; Shih, Chih-Kang; Baddorf, Arthur P; Wu, Ruqian; Li, An-Ping
2012-02-08
Quantum wires, as a smallest electronic conductor, are expected to be a fundamental component in all quantum architectures. The electronic conductance in quantum wires, however, is often dictated by structural instabilities and electron localization at the atomic scale. Here we report on the evolutions of electronic transport as a function of temperature and interwire coupling as the quantum wires of GdSi(2) are self-assembled on Si(100) wire-by-wire. The correlation between structure, electronic properties, and electronic transport are examined by combining nanotransport measurements, scanning tunneling microscopy, and density functional theory calculations. A metal-insulator transition is revealed in isolated nanowires, while a robust metallic state is obtained in wire bundles at low temperature. The atomic defects lead to electron localizations in isolated nanowire, and interwire coupling stabilizes the structure and promotes the metallic states in wire bundles. This illustrates how the conductance nature of a one-dimensional system can be dramatically modified by the environmental change on the atomic scale. © 2012 American Chemical Society
47 CFR 32.2426 - Intrabuilding network cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Intrabuilding network cable. 32.2426 Section 32... Intrabuilding network cable. (a) This account shall include the original cost of cables and wires located on the company's side of the demarcation point or standard network interface inside subscribers' buildings or...
47 CFR 32.2426 - Intrabuilding network cable.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Intrabuilding network cable. 32.2426 Section 32... Intrabuilding network cable. (a) This account shall include the original cost of cables and wires located on the company's side of the demarcation point or standard network interface inside subscribers' buildings or...
CJ concept for advanced aircraft wiring
NASA Technical Reports Server (NTRS)
Redslob, J.
1972-01-01
The techniques and hardware are described which were developed for facilitating the use of flexible flat conductor cable (FFCC) in commercial air transports. The system was designed as an evolutionary transition from the current round wire harnessing to the use of FFCC harnesses. The equipment discussed includes the pressure crimp barrel designed for terminating FFCC, reel-fed applicator, cable connectors and adaptors, and equipment racks.
Management of displaced comminuted patellar fracture with titanium cable cerclage.
Yang, Li; Yueping, Ouyang; Wen, Yuan
2010-08-01
Management of a displaced comminuted patellar fracture is challenging. Tension band wiring and lag screw fixation are not suitable for such a fracture pattern. Stainless steel wiring with various configurations has been the mainstay of treatment. However, issues of loss of fixation and breakage of wire have not been resolved yet. Partial or total patellectomy is the last resort with a detrimental effect on quadriceps power. Braided titanium cable is stronger in tensile strength and better in fatigue resistance than the stainless steel monofilament wire, and the tension of fixation could be controlled by a graded instrument in its application. We used titanium cable to treat 21 consecutive patients with displaced comminuted patellar fracture. Patients were followed up for a mean period of 24 months (12 to 32 months). The mean score at the final follow-up was 27 points (25 to 30) using the Böstman method. There was no complication except breakage of one cable at the sixth week after the operation and the fracture had united despite the breakage. This technique is simple and effective for these difficult fractures and avoided prolonged immobilisation of the knee. Copyright 2010 Elsevier B.V. All rights reserved.
"Fly-by-Wireless": A Revolution in Aerospace Vehicle Architecture for Instrumentation and Control
NASA Technical Reports Server (NTRS)
Studor, George
2007-01-01
Aerospace vehicle programs have always counted on the cables and connectors to provide power, grounding, data and time synchronization throughout a vehicle's life-cycle. Even with numerous improvements, wiring and connector problems and sensors continue to be key failure points, causing many hours of troubleshooting and replacement. Costly flight delays have been precipitated by the need to troubleshoot cables/connections, and/or repair a sensor. Wiring continues to be too expensive to remove once it is installed, even with the weight penalties. Miles of test instrumentation and low flight sensor wires still plague the aerospace industry. New technology options for data connectivity, processing and micro/nano manufacturing are making it possible to retrofit existing vehicles, like the Space Shuttle. New vehicles can now develop architectures that provide for and take advantage of alternatives to wired connectivity. This project motivates the aerospace industry and technology providers to establish: (1) A new emphasis for system engineering approaches to reduce cables and connectors. (2) Provisions for modularity and accessibility in the vehicle architecture. (3) A set of technologies that support alternatives to wired connectivity.
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Protection of insulated wire; splice in underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Protection of insulated wire; splice in underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
Iodine doped carbon nanotube cables exceeding specific electrical conductivity of metals
Zhao, Yao; Wei, Jinquan; Vajtai, Robert; Ajayan, Pulickel M.; Barrera, Enrique V.
2011-01-01
Creating highly electrically conducting cables from macroscopic aggregates of carbon nanotubes, to replace metallic wires, is still a dream. Here we report the fabrication of iodine-doped, double-walled nanotube cables having electrical resistivity reaching ∼10−7 Ω.m. Due to the low density, their specific conductivity (conductivity/weight) is higher than copper and aluminum and is only just below that of the highest specific conductivity metal, sodium. The cables exhibit high current-carrying capacity of 104∼105 A/cm2 and can be joined together into arbitrary length and diameter, without degradation of their electrical properties. The application of such nanotube cables is demonstrated by partly replacing metal wires in a household light bulb circuit. The conductivity variation as a function of temperature for the cables is five times smaller than that for copper. The high conductivity nanotube cables could find a range of applications, from low dimensional interconnects to transmission lines. PMID:22355602
Electronic scraps--recovering of valuable materials from parallel wire cables.
de Araújo, Mishene Christie Pinheiro Bezerra; Chaves, Arthur Pinto; Espinosa, Denise Crocce Romano; Tenório, Jorge Alberto Soares
2008-11-01
Every year, the number of discarded electro-electronic products is increasing. For this reason recycling is needed, to avoid wasting non-renewable natural resources. The objective of this work is to study the recycling of materials from parallel wire cable through unit operations of mineral processing. Parallel wire cables are basically composed of polymer and copper. The following unit operations were tested: grinding, size classification, dense medium separation, electrostatic separation, scrubbing, panning, and elutriation. It was observed that the operations used obtained copper and PVC concentrates with a low degree of cross contamination. It was concluded that total liberation of the materials was accomplished after grinding to less than 3 mm, using a cage mill. Separation using panning and elutriation presented the best results in terms of recovery and cross contamination.
New tension band material for fixation of transverse olecranon fractures: a biomechanical study.
Lalonde, James Allen; Rabalais, R David; Mansour, Alfred; Burger, Evalina L; Riemer, Barry L; Lu, Yun; Baratta, Richard V
2005-10-01
This study tested the use of braided polyethylene cable as an option for repairing transverse olecranon fractures. Six cadaveric elbows underwent a transverse olecranon osteotomy followed by fixation with tension band constructs using 18-gauge wire and Secure-Strand (U.S. Surgical, North Haven, Conn). Distraction forces up to 450 N were applied to the triceps tendon while measuring fracture displacement with an extensometer. The average maximal fracture gap with the standard AO tension band technique using stainless steel wire was 0.66 +/- 0.43 mm, as opposed to 0.68 +/- 0.45 mm with braided polyethylene cable. A paired t test indicated no significant difference between the two materials. These results support the feasibility of braided polyethylene cable as an alternative to the standard steel-wire tension band.
Sellers holds up a bundle of tangled audio cables during STS-121 / Expedition 13 joint operations
2006-07-15
S121-E-07791 (15 July 2006) --- Astronaut Piers J. Sellers, STS-121 mission specialist, works with cables on the middeck of Space Shuttle Discovery as the shuttle crew prepares to undock from the International Space Station.
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
Noise propagation issues in Belle II pixel detector power cable
Iglesias, M.; Arteche, F.; Echeverria, I.; ...
2018-04-26
The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This article presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impactmore » on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less
Noise propagation issues in Belle II pixel detector power cable
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iglesias, M.; Arteche, F.; Echeverria, I.
The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This article presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impactmore » on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less
All on One Wire: Pros and Cons of Mega-Channel, Interactive Cable.
ERIC Educational Resources Information Center
Acker, Stephen R.
Interactive cable television systems take advantage of the ability of coaxial cables to transmit information in two directions. QUBE in Columbus, Ohio, and Project Ida in Canada use cable's interactive ability to provide a variety of services. QUBE allows electronic "town meetings" and provides access to stock quotes, newspaper…
46 CFR 111.60-6 - Fiber optic cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...
The Wired Nation. Cable TV: The Electronic Communications Highway.
ERIC Educational Resources Information Center
Smith, Ralph Lee
The problems and potentials of cable television are examined in this book, which begins by describing the technological basis and current state of cable television. Topics covered include the economic base of the industry and the struggles for economic control, the development of a regulatory structure, the relationship between cable television…
46 CFR 111.60-6 - Fiber optic cable.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...
46 CFR 111.60-6 - Fiber optic cable.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...
46 CFR 111.60-6 - Fiber optic cable.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...
46 CFR 111.60-6 - Fiber optic cable.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...
Li, Dongsheng; Ou, Jinping; Lan, Chengming; Li, Hui
2012-01-01
Cables play an important role in cable-stayed systems, but are vulnerable to corrosion and fatigue damage. There is a dearth of studies on the fatigue damage evolution of corroded cable. In the present study, the acoustic emission (AE) technology is adopted to monitor the fatigue damage evolution process. First, the relationship between stress and strain is determined through a tensile test for corroded and non-corroded steel wires. Results show that the mechanical performance of corroded cables is changed considerably. The AE characteristic parameters for fatigue damage are then established. AE energy cumulative parameters can accurately describe the fatigue damage evolution of corroded cables. The failure modes in each phase as well as the type of acoustic emission source are determined based on the results of scanning electron microscopy. The waveform characteristics, damage types, and frequency distribution of the corroded cable at different damage phases are collected. Finally, the number of broken wires and breakage time of the cables are determined according to the variation in the margin index. PMID:22666009
Biomechanical analysis of tension band fixation for olecranon fracture treatment.
Kozin, S H; Berglund, L J; Cooney, W P; Morrey, B F; An, K N
1996-01-01
This study assessed the strength of various tension band fixation methods with wire and cable applied to simulated olecranon fractures to compare stability and potential failure or complications between the two. Transverse olecranon fractures were simulated by osteotomy. The fracture was anatomically reduced, and various tension band fixation techniques were applied with monofilament wire or multifilament cable. With a material testing machine load displacement curves were obtained and statistical relevance determined by analysis of variance. Two loading modes were tested: loading on the posterior surface of olecranon to simulate triceps pull and loading on the anterior olecranon tip to recreate a potential compressive loading on the fragment during the resistive flexion. All fixation methods were more resistant to posterior loading than to an anterior load. Individual comparative analysis for various loading conditions concluded that tension band fixation is more resilient to tensile forces exerted by the triceps than compressive forces on the anterior olecranon tip. Neither wire passage anterior to the K-wires nor the multifilament cable provided statistically significant increased stability.
Self-inflicted long complex urethro-vesical foreign body: is open surgery always needed?
Garg, Manish; Kumar, Manoj; Sankhwar, Satyanarayan; Singh, Vishwajeet
2013-01-01
In this case report, we describe our experience of a self-inflicted long complex urethrovesical foreign body managed suprapubically through the minimally invasive technique. A 21-year-old man with antipsychotic treatment for the past 10 years presented with a long electric cable wire in his bladder with the distal end in the penile urethra. He presented with symptoms of voiding difficulty and gross haematuria. An attempt of gentle retrieval of wire through the cystoscopic forceps was not successful due to a very complex knot of cable in the bladder. To avoid open surgery such as suprapubic cystotomy, the percutaneous minimally invasive approach was planned. Access to the bladder was achieved by the suprapubic puncture of the bladder, placement of a guide-wire and serial dilation of supra-pubic tract. With the help of nephroscope, through suprapubic tract, the cable wire was retrieved antegradely without causing undue trauma to the bladder or urethra. PMID:23749820
Results of Buoyancy-gravity Effects in ITER Cable-in- Conduit Conductor with Dual Channel
NASA Astrophysics Data System (ADS)
Bruzzone, P.; Stepanov, B.; Zanino, R.; Richard, L. Savoldi
2006-04-01
The coolant in the ITER cable-in-conduit conductors (CICC) flows at significant higher speed in the central channel than in the strand bundle region due to the large difference of hydraulic impedance. When energy is deposited in the bundle region, e.g. by ac loss or radiation, the heat removal in vertically oriented dual channel CICC with the coolant flowing downward is affected by the reduced density of helium (buoyancy) in the bundle region, which is arising from the temperature gradient due to poor heat exchange between the two channels. At large deposited power, flow stagnation and back-flow can cause in the strand bundle area a slow temperature runaway eventually leading to quench. A new test campaign of the thermal-hydraulic behavior was carried out in the SULTAN facility on an instrumented section of the ITER Poloidal Field Conductor Insert (PFIS). The buoyancy-gravity effect was investigated using ac loss heating, with ac loss in the cable calibrated in separate runs. The extent of upstream temperature increase was explored over a broad range of mass flow rate and deposited power. The experimental behavior is partly reproduced by numerical simulations. The results from the tests are extrapolated to the likely operating conditions of the ITER Toroidal Field conductor with the inboard leg cooled from top to bottom and heat deposited by nuclear radiation from the burning plasma.
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Open-wire transmission line; clearance to other..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission line; clearance to other circuits. Open-wire transmission line operating at voltage of 750 volts or...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Open-wire transmission line; clearance to other..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission line; clearance to other circuits. Open-wire transmission line operating at voltage of 750 volts or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... Configuration Control Limitations (CDCCL) task to make certain that the by-pass wire remains installed. On later... in-tank Fuel Quantity Indication (FQI) cable plug and the cable shield of the shielded FQI system... (FQI) cable plug and the cable shield of the shielded FQI system cables in the main and collector fuel...
24 CFR 3285.906 - Telephone and cable TV.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...
Progress in American Superconductor's HTS wire and optimization for fault current limiting systems
NASA Astrophysics Data System (ADS)
Malozemoff, Alexis P.
2016-11-01
American Superconductor has developed composite coated conductor tape-shaped wires using high temperature superconductor (HTS) on a flexible substrate with laminated metal stabilizer. Such wires enable many applications, each requiring specific optimization. For example, coils for HTS rotating machinery require increased current density J at 25-50 K. A collaboration with Argonne, Brookhaven and Los Alamos National Laboratories and several universities has increased J using an optimized combination of precipitates and ion irradiation defects in the HTS. Major commercial opportunities also exist to enhance electric power grid resiliency by linking substations with distribution-voltage HTS power cables [10]. Such links provide alternative power sources if one substation's transmission-voltage power is compromised. But they must also limit fault currents which would otherwise be increased by such distribution-level links. This can be done in an HTS cable, exploiting the superconductor-to-resistive transition when current exceeds the wires' critical J. A key insight is that such transitions are usually nonuniform; so the wire must be designed to prevent localized hot spots from damaging the wire or even generating gas bubbles in the cable causing dielectric breakdown. Analysis shows that local heating can be minimized by increasing the composite tape's total thickness, decreasing its total resistance in the normal state and decreasing its critical J. This conflicts with other desirable wire characteristics. Optimization of these conflicting requirements is discussed.
Misra, A; Burke, JF; Ramayya, A; Jacobs, J; Sperling, MR; Moxon, KA; Kahana, MJ; Evans, JJ; Sharan, AD
2014-01-01
Objective The authors report methods developed for the implantation of micro-wire bundles into mesial temporal lobe structures and subsequent single neuron recording in epileptic patients undergoing in-patient diagnostic monitoring. This is done with the intention of lowering the perceived barriers to routine single neuron recording from deep brain structures in the clinical setting. Approach Over a 15 month period, 11 patients were implanted with platinum micro-wire bundles into mesial temporal structures. Protocols were developed for A) monitoring electrode integrity through impedance testing, B) ensuring continuous 24-7 recording, C) localizing micro-wire position and “splay” pattern and D) monitoring grounding and referencing to maintain the quality of recordings. Main Result Five common modes of failure were identified: 1) broken micro-wires from acute tensile force, 2) broken micro-wires from cyclic fatigue at stress points, 3) poor in-vivo micro-electrode separation, 4) motion artifact and 5) deteriorating ground connection and subsequent drop in common mode noise rejection. Single neurons have been observed up to 14 days post implantation and on 40% of micro-wires. Significance Long-term success requires detailed review of each implant by both the clinical and research teams to identify failure modes, and appropriate refinement of techniques while moving forward. This approach leads to reliable unit recordings without prolonging operative times, which will help increase the availability and clinical viability of human single neuron data. PMID:24608589
NASA Technical Reports Server (NTRS)
Carroll, Joseph A.; Alexander, Charles M.
1993-01-01
Design concept promises speed, control, and reliability. Scheme for deploying tether provides for fast, free, and snagless payout and fast, dependable braking. Developed for small, expendable tethers in outer space, scheme also useful in laying transoceanic cables, deploying guidance wires to torpedoes and missiles, paying out rescue lines from ship to ship via rockets, deploying antenna wires, releasing communication and power cables to sonobuoys and expendable bathythermographs, and in reeling out lines from fishing rods.
PPM-based System for Guided Waves Communication Through Corrosion Resistant Multi-wire Cables
NASA Astrophysics Data System (ADS)
Trane, G.; Mijarez, R.; Guevara, R.; Pascacio, D.
Novel wireless communication channels are a necessity in applications surrounded by harsh environments, for instance down-hole oil reservoirs. Traditional radio frequency (RF) communication schemes are not capable of transmitting signals through metal enclosures surrounded by corrosive gases and liquids. As an alternative to RF, a pulse position modulation (PPM) guided waves communication system has been developed and evaluated using a corrosion resistant 4H18 multi-wire cable, commonly used to descend electronic gauges in down-hole oil applications, as the communication medium. The system consists of a transmitter and a receiver that utilizes a PZT crystal, for electrical/mechanical coupling, attached to each extreme of the multi-wire cable. The modulator is based on a microcontroller, which transmits60 kHz guided wave pulses, and the demodulator is based on a commercial digital signal processor (DSP) module that performs real time DSP algorithms. Experimental results are presented, which were obtained using a 1m corrosion resistant 4H18multi-wire cable, commonly used with downhole electronic gauges in the oil sector. Although there was significant dispersion and multiple mode excitations of the transmitted guided wave energy pulses, the results show that data rates on the order of 500 bits per second are readily available employing PPM and simple communications techniques.
Analysis of Surveyor 3 television cable after residence on the moon
NASA Technical Reports Server (NTRS)
Gross, F. C.; Park, J. J.
1972-01-01
The Apollo 12 astronauts brought the Surveyor III television camera back from the moon in November 1969. Chemical analyses of a portion of television cable revealed changes in the glass fabric sleeve and in the wire insulation as a result of exposure to the lunar environment. Loss of volatile constituents from the glass fabric and a discoloration of the glass occurred. The Teflon layer on the wire showed a slight discoloration and possibly a slight change in its infrared spectrum. Both the polyimide layer and the Teflon layer of the wire insulation showed changes in tensile strength and elongation.
40 CFR 420.91 - Specialized definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... wire, rods, and tubes in discrete batches or bundles. (f) The term continuous means those pickling operations which process steel products other than in discrete batches or bundles. (g) The term acid recovery...
Code of Federal Regulations, 2010 CFR
2010-10-01
... a nationwide network of broadcast stations and other entities connected with government activation... television stations, and wired and wireless cable television systems, DBS, DTV, SDARS, digital cable and DAB...
Marasco, Silvana F; Fuller, Louise; Zimmet, Adam; McGiffin, David; Seitz, Michael; Ch'ng, Stephanie; Gangahanumaiah, Shivanand; Bailey, Michael
2018-04-16
Midline sternotomy remains the most common access incision for cardiac operations. Traditionally, the sternum is closed with stainless steel wires. Wires are well known to stretch and break, however, leading to pain, nonunion, and potential deep sternal wound infection. We hypothesized that biocompatible plastic cable ties would achieve a more rigid sternal fixation, reducing postoperative pain and analgesia requirements. A prospective, randomized study compared the ZIPFIX (De Puy Synthes, West Chester, Pa) sternal closure system (n = 58) with standard stainless steel wires (n = 60). Primary outcomes were pain and analgesia requirements in the early postoperative period. Secondary outcome was sternal movement, as assessed by ultrasound at the postoperative follow-up visit. Groups were well matched in demographic and operative variables. There were no significant differences between groups in postoperative pain, analgesia, or early ventilatory requirements. Patients in the ZIPFIX group had significantly more movement in the sternum and manubrium on ultrasound at 4 weeks. ZIPFIX sternal cable ties provide reliable closure but no demonstrable benefit in this study in pain or analgesic requirements relative to standard wire closure after median sternotomy. Crown Copyright © 2018. Published by Elsevier Inc. All rights reserved.
30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems...
30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems...
Charge-Dissipative Electrical Cables
NASA Technical Reports Server (NTRS)
Kolasinski, John R.; Wollack, Edward J.
2004-01-01
Electrical cables that dissipate spurious static electric charges, in addition to performing their main functions of conducting signals, have been developed. These cables are intended for use in trapped-ion or ionizing-radiation environments, in which electric charges tend to accumulate within, and on the surfaces of, dielectric layers of cables. If the charging rate exceeds the dissipation rate, charges can accumulate in excessive amounts, giving rise to high-current discharges that can damage electronic circuitry and/or systems connected to it. The basic idea of design and operation of charge-dissipative electrical cables is to drain spurious charges to ground by use of lossy (slightly electrically conductive) dielectric layers, possibly in conjunction with drain wires and/or drain shields (see figure). In typical cases, the drain wires and/or drain shields could be electrically grounded via the connector assemblies at the ends of the cables, in any of the conventional techniques for grounding signal conductors and signal shields. In some cases, signal shields could double as drain shields.
Acoustic emission monitoring and critical failure identification of bridge cable damage
NASA Astrophysics Data System (ADS)
Li, Dongsheng; Ou, Jinping
2008-03-01
Acoustic emission (AE) characteristic parameters of bridge cable damage were obtained on tensile test. The testing results show that the AE parameter analysis method based on correlation figure of count, energy, duration time, amplitude and time can express the whole damage course, and can correctly judge the signal difference of broken wire and unbroken wire. It found the bridge cable AE characteristics aren't apparent before yield deformation, however they are increasing after yield deformation, at the time of breaking, and they reach to maximum. At last, the bridge cable damage evolution law is studied applying the AE characteristic parameter time series fractal theory. In the initial and middle stage of loading, the AE fractal value of bridge cable is unsteady. The fractal value reaches to the minimum at the critical point of failure. According to this changing law, it is approached how to make dynamic assessment and estimation of damage degrees.
PCACE- PERSONAL COMPUTER AIDED CABLING ENGINEERING
NASA Technical Reports Server (NTRS)
Billitti, J. W.
1994-01-01
A computerized interactive harness engineering program has been developed to provide an inexpensive, interactive system which is designed for learning and using an engineering approach to interconnection systems. PCACE is basically a database system that stores information as files of individual connectors and handles wiring information in circuit groups stored as records. This directly emulates the typical manual engineering methods of data handling, thus making the user interface to the program very natural. Data files can be created, viewed, manipulated, or printed in real time. The printed ouput is in a form ready for use by fabrication and engineering personnel. PCACE also contains a wide variety of error-checking routines including connector contact checks during hardcopy generation. The user may edit existing harness data files or create new files. In creating a new file, the user is given the opportunity to insert all the connector and harness boiler plate data which would be part of a normal connector wiring diagram. This data includes the following: 1) connector reference designator, 2) connector part number, 3) backshell part number, 4) cable reference designator, 5) cable part number, 6) drawing revision, 7) relevant notes, 8) standard wire gauge, and 9) maximum circuit count. Any item except the maximum circuit count may be left blank, and any item may be changed at a later time. Once a file is created and organized, the user is directed to the main menu and has access to the file boiler plate, the circuit wiring records, and the wiring records index list. The organization of a file is such that record zero contains the connector/cable boiler plate, and all other records contain circuit wiring data. Each wiring record will handle a circuit with as many as nine wires in the interface. The record stores the circuit name and wire count and the following data for each wire: 1) wire identifier, 2) contact, 3) splice, 4) wire gauge if different from standard, 5) wire/group type, 6) wire destination, and 7) note number. The PCACE record structure allows for a wide variety of wiring forms using splices and shields, yet retains sufficient structure to maintain ease of use. PCACE is written in TURBO Pascal 3.0 and has been implemented on IBM PC, XT, and AT systems under DOS 3.1 with a memory of 512K of 8 bit bytes, two floppy disk drives, an RGB monitor, and a printer with ASCII control characters. PCACE was originally developed in 1983, and the IBM version was released in 1986.
An evaluation of Brifen wire rope safety fence.
DOT National Transportation Integrated Search
2013-01-01
Three : - : strand : cable barriers were first developed in the 1960s and found to have several desirable : characteristics as compared to other roadside barriers such as guard rail : . : Brifen Wire Rope Safety Fence is : a four strand woven wire...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
1993-11-18
CABEL Industria Bellcore, Morristown, NJ; and I. M. Plitz, Bellcore, Venezolana de Cables Electricos C.A., Valencia, Red Bank, NJ...COMPOSITE CABLE Salvador camps, Carlos Osorio, Richard Vasquez and J. A. Olszewski CABEL Industria Venezolana de Cables Electricos C.A. Valencia...durability. As a result. the automatic control puller can consistently pull a cable, whether the cable is wet or not. 3.2 Crawler Auto -adjusting mechanism
Simulation of the cabling process for Rutherford cables: An advanced finite element model
NASA Astrophysics Data System (ADS)
Cabanes, J.; Garlasche, M.; Bordini, B.; Dallocchio, A.
2016-12-01
In all existing large particle accelerators (Tevatron, HERA, RHIC, LHC) the main superconducting magnets are based on Rutherford cables, which are characterized by having: strands fully transposed with respect to the magnetic field, a significant compaction that assures a large engineering critical current density and a geometry that allows efficient winding of the coils. The Nb3Sn magnets developed in the framework of the HL-LHC project for improving the luminosity of the Large Hadron Collider (LHC) are also based on Rutherford cables. Due to the characteristics of Nb3Sn wires, the cabling process has become a crucial step in the magnet manufacturing. During cabling the wires experience large plastic deformations that strongly modify the geometrical dimensions of the sub-elements constituting the superconducting strand. These deformations are particularly severe on the cable edges and can result in a significant reduction of the cable critical current as well as of the Residual Resistivity Ratio (RRR) of the stabilizing copper. In order to understand the main parameters that rule the cabling process and their impact on the cable performance, CERN has developed a 3D Finite Element (FE) model based on the LS-Dyna® software that simulates the whole cabling process. In the paper the model is presented together with a comparison between experimental and numerical results for a copper cable produced at CERN.
Apparatus producing constant cable tension for intermittent demand
Lauritzen, T.
1984-05-23
This invention relates to apparatus for producing constant tension in cable or the like when it is unreeled and reeled from a drum or spool under conditions of intermittent demand. The invention is particularly applicable to the handling of superconductive cable, but the invention is also applicable to the unreeling and reeling of other strands, such as electrical cable, wire, cord, other cables, fish line, wrapping paper and numerous other materials.
Protected, high-temperature connecting cable
NASA Technical Reports Server (NTRS)
Engdahl, R. E.
1967-01-01
Ceramic insulated, swaged stainless steel, sheathed, protective atmosphere cable admits electrical leads into an 1800 deg F air-environment test chamber. The cable has some bending capability and provides for nine niobium alloy conductors. An argon purge during the TIG weld closure protects internal wires from oxidation and embrittlement.
Using the HELIOS facility for assessment of bundle-jacket thermal coupling in a CICC
NASA Astrophysics Data System (ADS)
Lacroix, B.; Rousset, B.; Cloez, H.; Decool, P.; Duchateau, J. L.; Hoa, C.; Luchier, N.; Nicollet, S.; Topin, F.
2016-12-01
In a Cable In Conduit Conductor (CICC) cooled by forced circulation of supercritical helium, the heat exchange in the bundle region can play a significant role for conductor safe operation, while remaining a quite uncertain parameter. Heat exchange between bundle and jacket depends on the relative contributions of convective heat transfer due to the helium flow inside the bundle and of thermal resistance due to the wrappings between the cable and the conduit. In order to qualify this thermal coupling at realistic operating conditions, a dedicated experiment on a 1.2 m sample of ITER Toroidal Field (TF) dummy conductor was designed and performed in the HELIOS test facility at CEA Grenoble. Several methods were envisaged, and the choice was made to assess bundle-jacket heat transfer coefficient by measuring the temperature of a solid copper cylinder inserted over the conductor jacket and submitted to heat deposition on its outer surface. The mock-up was manufactured and tested in spring 2015. Bundle-jacket heat transfer coefficient was found in the range 300-500 W m-2 K-1. Results analysis suggests that the order of magnitude of convective heat transfer coefficient inside bundle is closer to Colburn-Reynolds analogy than to Dittus-Boelter correlation, and that bundle-jacket thermal coupling is mainly limited by thermal resistance due to wrappings. A model based on an equivalent layer of stagnant helium between wraps and jacket was proposed and showed a good consistency with the experiment, with relevant values for the helium layer thickness.
2011-09-01
Testing Input electrodes consisting of 1/2” diameter, 6” long copper rods were wired to separate conductors of a shielded, commercially available...underwater-rated electrical cable (three-conductor, shielded, shipboard cable (TSS-2), 18 American Wire Gauge (AWG) stranded copper ). Electrode pairs...sandpaper prior to use to ensure the best electrical continuity between the water and electrode by removing any copper oxide. This electrode
Technology of Producing the Contact Connections of Superconductor Metal-Sheathed Cable
NASA Astrophysics Data System (ADS)
Jakubowski, Andrzej
2017-06-01
The technology of producing the current contact connections on the superconductor cable edges is presented. This lead cable is used as one of the major elements of the magnetic system in thermonuclear reactor construction, actuality for modern world energy. The technology is realized by the radial draft of metal thin-walled tube on the conductor's package. The filling of various profiles by round section wire is optimized. Geometrical characteristics of the dangerous crosssection (as a broken ring) of thin-walled tube injured by the sector cut-out are accounted. The comparative strength calculation of the solid and injured tubes at a longitudinal compression and lateral bending is acted. The radial draft mechanism of cylindrical thin-walled sheath with the wire packing is designed. The necessity to use the nonlinear theory for the sheaths calculate is set. The resilient co-operation of wires as the parallel located cylinders with the contact stripes of rectangular form is considered.
NASA Astrophysics Data System (ADS)
Tomita, Masaru
The development of a superconducting cable for railways has commenced, assuming that a DC transmission cable will be used for electric trains. The cable has been fabricated based on the results of current testing of a superconducting wire, and various evaluation tests have been performed to determine the characteristics of the cable. A superconducting transmission cable having zero electrical resistance and suitable for railway use is expected to enhance regeneration efficiency, reduce power losses, achieve load leveling and integration of sub-stations, and reduce rail potential.
Minimally invasive tension band wiring technique for olecranon fractures.
Takada, Naoya; Kato, Kenji; Fukuta, Makoto; Wada, Ikuo; Otsuka, Takanobu
2013-12-01
Some types of implants, such as plates, screws, wires, and nails, have been used for open reduction and internal fixation of olecranon fractures. A ≥ 10 cm longitudinal incision is used for open reduction and internal fixation of olecranon fractures. According to previous studies, tension band wiring is a popular method that gives good results. However, back out of the wires after the surgery is one of the main postoperative complications. Moreover, if the Kirschner wires are inserted through the anterior ulnar cortex, they may impinge on the radial neck, supinator muscle, or biceps tendon. Herein, we describe the minimally invasive tension band wiring technique using Ring-Pin. This technique can be performed through a 2 cm incision. Small skin incisions are advantageous from an esthetic viewpoint. Ring-Pin was fixed by using a dedicated cable wire that does not back out unless the cable wire breaks or slips out of the dedicated metallic clamp. As the pins are placed in intramedullary canal, this technique does not lead to postoperative complications that may occur after transcortical fixation by conventional tension band wiring. Minimally invasive tension band wiring is one of the useful options for the treatment of olecranon fractures with some advantages.
Study on galloping behavior of iced eight bundle conductor transmission lines
NASA Astrophysics Data System (ADS)
Zhou, Linshu; Yan, Bo; Zhang, Liang; Zhou, Song
2016-02-01
Wind tunnel test was carried out to obtain the aerodynamic coefficients of an eight bundle conductor accreted with crescent-shaped ice. A user-defined cable element with torsional degree of freedom is developed in ABAQUS software to capture the torsional deformation of the iced conductors during galloping. By means of the user-defined cable element, different damping ratios in in-plane, out-of-plane and torsional directions of the conductors can be defined and the aerodynamic forces varying with their motion status can be exerted on the conductors conveniently when ABAQUS is used to simulate galloping of transmission lines. A wind tunnel test to model galloping of an iced eight bundle conductor segment was carried out, and the validity of the numerical simulation method is demonstrated by the agreement of the galloping orbit of the bundle conductor segment model recorded in the test and that by the numerical simulation. Furthermore, galloping behavior, including dynamic responses, galloping orbits, frequencies, vibration modes and amplitudes, of typical iced eight bundle conductor transmission lines in the cases of different span lengths, initial tensions in sub-conductors, wind velocities, angles of wind attack and damping ratios is studied, and the galloping behavior of the lines with internal resonance conditions is discussed. The obtained results may provide a fundamental tool for the development of anti-galloping techniques of eight bundle conductor transmission lines.
Reliability in fiber optic cable harness manufacturing
NASA Astrophysics Data System (ADS)
McCoy, Bruce M.
Key aspects of manufacturing cable harnesses for aircraft and spacecraft that incorporate optical fiber/cables along with traditional wiring are discussed. Issues regarding feasibility of automation of assembly processes, manual assembly, testing, installation, quality assurance, reliability and maintainability are addressed. Training procedures, formal training programs, and their results are reviewed.
Henderson, Fraser; Takacs, Istvan
2017-01-01
Troubleshooting of deep brain stimulators (DBSs, Activa SC/PC/RC Medtronic PLC, Minneapolis, Minnesota, USA) sometimes results in a decision to replace a tunneled stretch-coil extension cable. We present a simple technique to accomplish this atraumatically without a tunneling tool. In the treatment of patients with a DBS, complication avoidance and efficiency of operative time are paramount. We sought to find the safest, most effective, and fastest method of performing the conceptually simple yet technically nuanced act of replacing lead extension cables. We connected #6 (8.0 metric) surgical steel 18″ (45-cm) monofilament (Ethicon US, LLC, Somerville, New Jersey, USA), also known as #6 sternal wire, in line with DBS extension cables (Medtronic DBS Extension 37086-60) in novel fashion to overcome intraprocedural hurdles encountered during the past decade in a busy functional neurosurgery service. Patients tolerate the procedure well and return home shortly after recovery with no complications. A less expensive and faster technique for passing pulse generator extension cables may be the use of a sternal wire. Using the described technique, pulse generators may be quickly and safely adjusted from side to side and site to site as the clinical situation dictates. Copyright © 2016 Elsevier Inc. All rights reserved.
14 CFR 25.1717 - Circuit protective devices: EWIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1717 Circuit protective devices: EWIS. Electrical wires and cables must be designed and...
NASA Astrophysics Data System (ADS)
Schmidt, F.
1980-11-01
The components of a superconducting 110 kV ac cable for power ratings or = 2000 MVA were developed. The cable design is of the semiflexible type, with a rigid cryogenic envelope containing a flexible hollow coaxial cable core. The cable core consists of spirally wound Nb-A1 composite wires electrically insulated by high pressure polyethylene tape wrappings. A 35 m long single phase test cable with full load terminals rated at 110 kV and 10 kA was constructed and successfully tested. The results obtained prove the technical feasibility and capability of this cable design.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CABLE TELEVISION SERVICE Cable Inside Wiring § 76.800 Definitions. (a) MDU. A multiple dwelling unit... owns or controls the common areas of a multiple dwelling unit building. (c) MVPD. A multichannel video...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CABLE TELEVISION SERVICE Cable Inside Wiring § 76.800 Definitions. (a) MDU. A multiple dwelling unit... owns or controls the common areas of a multiple dwelling unit building. (c) MVPD. A multichannel video...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CABLE TELEVISION SERVICE Cable Inside Wiring § 76.800 Definitions. (a) MDU. A multiple dwelling unit... owns or controls the common areas of a multiple dwelling unit building. (c) MVPD. A multichannel video...
Handling fixture for soldering round wires to FCC
NASA Technical Reports Server (NTRS)
Loggins, R.; Martineck, H. G.
1971-01-01
Fixture holds flat conductor cable and wires in position until after soldering of contacting conductor ends and potting of junctions. Device provides for proper spacing of wires and adequate access for soldered joints during fabrication, and positions mold halves during potting operation.
Wiring design for the control of electromagnetic interference (EMI)
NASA Technical Reports Server (NTRS)
Kopasakis, George
1995-01-01
Wiring design is only one important aspect of EMI control. Other important areas for EMI are: circuit design, filtering, grounding, bonding, shielding, lighting, electrostatic discharge (ESD), transient suppression, and electromagnetic pulse (EMP). Topics covered include: wire magnetic field emissions at low frequencies; wire radiated magnetic field emissions at frequencies; wire design guidelines for EMI control; wire design guidelines for EMI control; high frequency emissions from cables; and pulse frequency spectra.
Loving, Vilert A; Edwards, David B; Roche, Kevin T; Steele, Joseph R; Sapareto, Stephen A; Byrum, Stephanie C; Schomer, Donald F
2014-06-01
In breast-conserving surgery for nonpalpable breast cancers, surgical reexcision rates are lower with radioactive seed localization (RSL) than wire localization. We evaluated the cost-benefit of switching from wire localization to RSL in two competing payment systems: a fee-for-service (FFS) system and a bundled payment system, which is typical for accountable care organizations. A Monte Carlo simulation was developed to compare the cost-benefit of RSL and wire localization. Equipment utilization, procedural workflows, and regulatory overhead differentiate the cost between RSL and wire localization. To define a distribution of possible cost scenarios, the simulation randomly varied cost drivers within fixed ranges determined by hospital data, published literature, and expert input. Each scenario was replicated 1000 times using the pseudorandom number generator within Microsoft Excel, and results were analyzed for convergence. In a bundled payment system, RSL reduced total health care cost per patient relative to wire localization by an average of $115, translating into increased facility margin. In an FFS system, RSL reduced total health care cost per patient relative to wire localization by an average of $595 but resulted in decreased facility margin because of fewer surgeries. In a bundled payment system, RSL results in a modest reduction of cost per patient over wire localization and slightly increased margin. A fee-for-service system suffers moderate loss of revenue per patient with RSL, largely due to lower reexcision rates. The fee-for-service system creates a significant financial disincentive for providers to use RSL, although it improves clinical outcomes and reduces total health care costs.
18 CFR 367.3970 - Account 397, Communication equipment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... items: (1) Amplifiers. (2) Antennae. (3) Booths. (4) Cables. (5) Carrier terminal equipment. (6...) Remote control equipment and lines. (23) Sending keys. (24) Storage batteries. (25) Switchboards. (26... and cable wires. ...
18 CFR 367.3970 - Account 397, Communication equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... items: (1) Amplifiers. (2) Antennae. (3) Booths. (4) Cables. (5) Carrier terminal equipment. (6...) Remote control equipment and lines. (23) Sending keys. (24) Storage batteries. (25) Switchboards. (26... and cable wires. ...
18 CFR 367.3970 - Account 397, Communication equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... items: (1) Amplifiers. (2) Antennae. (3) Booths. (4) Cables. (5) Carrier terminal equipment. (6...) Remote control equipment and lines. (23) Sending keys. (24) Storage batteries. (25) Switchboards. (26... and cable wires. ...
18 CFR 367.3970 - Account 397, Communication equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... items: (1) Amplifiers. (2) Antennae. (3) Booths. (4) Cables. (5) Carrier terminal equipment. (6...) Remote control equipment and lines. (23) Sending keys. (24) Storage batteries. (25) Switchboards. (26... and cable wires. ...
18 CFR 367.3970 - Account 397, Communication equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... items: (1) Amplifiers. (2) Antennae. (3) Booths. (4) Cables. (5) Carrier terminal equipment. (6...) Remote control equipment and lines. (23) Sending keys. (24) Storage batteries. (25) Switchboards. (26... and cable wires. ...
77 FR 9518 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
...) Installation of New Relay and Wiring Bundle Within 72 months after the effective date of this AD: Change the... and temperature control system (CACTCS). This AD requires doing certain wiring changes, installing a new relay and necessary wiring in the CACTCS, and performing an operational test of the cooling pack...
Research to develop guidelines for cathodic protection of concentric neutral cables, volume 3
NASA Astrophysics Data System (ADS)
Hanck, J. A.; Nekoksa, G.
1982-08-01
Data associated with the corrosion of concentric neutral (CN) wires of direct buried primary cables were statistically analyzed, and guidelines for cathodic protection of CN wires for the electric utility industry were developed. The cathodic protection are reported. Field tests conducted at 36 bellholes excavated in California, Oklahoma, and North Carolina are described. Details of the electrochemical, chemical, bacteriological, and sieve analyses of native soil and imported backfill samples are also included.
Zhu, Zhonglin; Ding, Hui; Shao, Hongyi; Zhou, Yixin; Wang, Guangzhi
2013-04-09
The wire fixation and the cable grip fixation have been developed for the extended trochanteric osteotomy (ETO) in the revision of total hip arthroplasty (THA). Many studies reported the postoperative performance of the patients, but with little quantitative biomechanical comparison of the two fixation systems. An in-vitro testing approach was designed to record the loosening between the femoral bed and the greater trochanter after fixations. Ten cadaveric femurs were chosen in this study. Each femur underwent the THA, revision by ETO and fixations. The tension to the greater trochanter was from 0 to 500N in vertical and lateral direction, respectively. The translation and rotation of the greater trochanter with respect to the bony bed were captured by an optical tracking system. In the vertical tension tests, the overall translation of the greater trochanter was observed 0.4 mm in the cable fixations and 7.0 mm in the wire fixations. In the lateral tension tests, the overall motion of the greater trochanter was 2.0 mm and 1.2° in the cable fixations, while it was 6.2 mm and 5.3° in the wire fixations. The result was significantly different between the two fixation systems. The stability of the proximal femur after ETO using different fixations in the revision THA was investigated. The cable grip fixation was significantly more stable than the wire fixation.
Optic fiber sensor-based smart bridge cable with functionality of self-sensing
NASA Astrophysics Data System (ADS)
He, Jianping; Zhou, Zhi; Jinping, Ou
2013-02-01
Bridge cables, characterized by distributed large span, serving in harsh environment and vulnerability to random damage, are the key load-sustaining components of cable-based bridges. To ensure the safety of the bridge structure, it is critical to monitor the loading conditions of these cables under lengthwise random damages. Aiming at obtaining accurate monitoring at the critical points as well as the general information of the cable force distributed along the entire cable, this paper presents a study on cable force monitoring by combining optical fiber Bragg grating (FBG) sensors and Brillouin optical time domain analysis/reflectory (BOTDA/R) sensing technique in one single optical fiber. A smart FRP-OF-FBG rebar based cable was fabricated by protruding a FRP packaged OF-FBG sensor into the bridge cable. And its sensing characteristics, stability under high stress state temperature self-compensation as well as BOTDA/R distributed data improvement by local FBG sensors have been investigated. The results show that FRP-OF-FBG rebar in the smart cable can deform consistantly along with the steel wire and the cable force obtained from the optical fiber sensors agree well with theoretical value with relative error less than ±5%. Besides, the temperature self-compensation method provides a significant cost-effective technique for the FRP-OF-FBG based cables' in situ cable force measurement. And furthermore, potential damages of the bridge cable, e.g. wire breaking and corrosion, can be characterized and symbolized by the discontinuity and fluctuation of the distributed BOTDA data thereafter accuracy improved by local FBG sensors.
Utility of polymer cerclage cables in revision shoulder arthroplasty.
Edwards, T Bradley; Stuart, Kyle D; Trappey, George J; O'Connor, Daniel P; Sarin, Vineet K
2011-04-11
Revision shoulder arthroplasty often requires humeral osteotomy for stem extraction or is complicated by periprosthetic fracture. In these situations, various modes of fixation are used, including cerclage wires, cable plates, and allograft strut augmentation. The use of metal wires and cables, however, has been associated with soft tissue irritation, sharps injuries, and accelerated wear of joint arthroplasty bearing surfaces. As an alternative to traditional metal cables, the SuperCable (Kinamed Inc, Camarillo, California) contains braided ultra-high molecular-weight polyethylene fibers surrounding a nylon core. To date, no studies have examined the use of nonmetallic cerclage cables in shoulder arthroplasty.A retrospective review was performed of 11 patients who underwent shoulder arthroplasty for which nonmetallic cerclage cables were used. Clinical and radiographic data were examined regarding patient age, procedure performed, indication for cerclage cabling, time to healing of osteotomy or fracture, and any complications associated with the use of these cerclage cables. Minimum follow-up was 1 year. Ten patients underwent reverse total shoulder arthroplasty, and 1 patient underwent revision unconstrained total shoulder arthroplasty. Mean follow-up was 20.5 months. Ten patients required humeral osteotomy for stem or cement removal. Allograft augmentation was performed in 7 patients. Mean time to healing was 3.2 months. No patients experienced loosening or migration of hardware or allograft, and no complications directly related to the use of nonmetallic cerclage cables were identified. Copyright 2011, SLACK Incorporated.
49 CFR 229.89 - Jumpers; cable connections.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Cable and jumper connections between locomotive may not have any of the following conditions: (1) Broken or badly chafed insulation. (2) Broken plugs, receptacles or terminals. (3) Broken or protruding strands of wire. ...
49 CFR 229.89 - Jumpers; cable connections.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Cable and jumper connections between locomotive may not have any of the following conditions: (1) Broken or badly chafed insulation. (2) Broken plugs, receptacles or terminals. (3) Broken or protruding strands of wire. ...
49 CFR 229.89 - Jumpers; cable connections.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Cable and jumper connections between locomotive may not have any of the following conditions: (1) Broken or badly chafed insulation. (2) Broken plugs, receptacles or terminals. (3) Broken or protruding strands of wire. ...
49 CFR 229.89 - Jumpers; cable connections.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Cable and jumper connections between locomotive may not have any of the following conditions: (1) Broken or badly chafed insulation. (2) Broken plugs, receptacles or terminals. (3) Broken or protruding strands of wire. ...
Method of constructing a superconducting magnet
Satti, John A.
1981-01-01
A superconducting magnet designed to produce magnetic flux densities of the order of 4 to 5 Webers per square meter is constructed by first forming a cable of a plurality of matrixed superconductor wires with each wire of the plurality insulated from each other one. The cable is shaped into a rectangular cross-section and is wound with tape in an open spiral to create cooling channels. Coils are wound in a calculated pattern in saddle shapes to produce desired fields, such as dipoles, quadrupoles, and the like. Wedges are inserted between adjacent cables as needed to maintain substantially radial placement of the long dimensions of cross sections of the cables. After winding, individual strands in each of the cables are brought out to terminals and are interconnected to place all of the strands in series and to maximize the propagation of a quench by alternating conduction from an inner layer to an outer layer and from top half to bottom half as often as possible. Individual layers are separated from others by spiraled aluminum spacers to facilitate cooling. The wound coil is wrapped with an epoxy tape that is cured by heat and then machined to an interference fit with an outer aluminum pipe which is then affixed securely to the assembled coil by heating it to make a shrink fit. In an alternate embodiment, one wire of the cable is made of copper or the like to be heated externally to propagate a quench.
Satti, John A.
1980-01-01
A superconducting magnet designed to produce magnetic flux densities of the order of 4 to 5 Webers per square meter is constructed by first forming a cable of a plurality of matrixed superconductor wires with each wire of the plurality insulated from each other one. The cable is shaped into a rectangular cross-section and is wound with tape in an open spiral to create cooling channels. Coils are wound in a calculated pattern in saddle shapes to produce desired fields, such as dipoles, quadrupoles, and the like. Wedges are inserted between adjacent cables as needed to maintain substantially radial placement of the long dimensions of cross sections of the cables. After winding, individual strands in each of the cables are brought out to terminals and are interconnected to place all of the strands in series and to maximize the propagation of a quench by alternating conduction from an inner layer to an outer layer and from top half to bottom half as often as possible. Individual layers are separated from others by spiraled aluminum spacers to facilitate cooling. The wound coil is wrapped with an epoxy tape that is cured by heat and then machined to an interference fit with an outer aluminum pipe which is then affixed securely to the assembled coil by heating it to make a shrink fit. In an alternate embodiment, one wire of the cable is made of copper or the like to be heated externally to propagate a quench.
Proceedings of the Symposium on Cable Television.
ERIC Educational Resources Information Center
Society of Motion Picture and Television Engineers, Inc., New York, NY.
The papers given at a symposium on cable television (CATV) are collected in this volume. The chairman of the symposium notes that "the phrase 'cable television' is not totally pertinent since we are talking about a wired-city concept that may encompass many services other than television." He prefers the term "broadband communications network,"…
Crossed Wires; Cable Television in New Jersey.
ERIC Educational Resources Information Center
Center for Analysis of Public Issues, Princeton, NJ.
Cable television (CATV) in New Jersey has been almost nonexistent: Because of the state's proximity to the major cities of New York and Philadelphia, there has been a scarcity of New Jersey-oriented news and public affairs programing. Cable television access, it is suggested, could fill this information gap in New Jersey if the state government…
NASA Technical Reports Server (NTRS)
Bredberg, Alan S.
2003-01-01
A versatile cable-dispensing cart can support as many as a few dozen reels of cable, wire, and/or rope. The cart can be adjusted to accommodate reels of various diameters and widths, and can be expanded, contracted, or otherwise reconfigured by use of easily installable and removable parts that can be carried onboard. Among these parts are dispensing rods and a cable guide that enables dispensing of cables without affecting the direction of pull. Individual reels can be mounted on or removed from the cart without affecting the other reels: this feature facilitates the replacement or reuse of partially depleted reels, thereby helping to reduce waste. Multiple cables, wires, or ropes can be dispensed simultaneously. For maneuverability, the cart is mounted on three wheels. Once it has been positioned, the cart is supported by rubber mounts for stability and for prevention of sliding or rolling during dispensing operations. The stability and safety of the cart are enhanced by a low-center-of-gravity design. The cart can readily be disassembled into smaller units for storage or shipping, then reassembled in the desired configuration at a job site.
First Principles Model of Electric Cable Braid Penetration with Dielectrics
Campione, Salvatore; Warne, Larry Kevin; Langston, William L.; ...
2018-01-01
In this study, we report the formulation to account for dielectrics in a first principles multipole-based cable braid electromagnetic penetration model. To validate our first principles model, we consider a one-dimensional array of wires, which can be modeled analytically with a multipole-conformal mapping expansion for the wire charges; however, the first principles model can be readily applied to realistic cable geometries. We compare the elastance (i.e. the inverse of the capacitance) results from the first principles cable braid electromagnetic penetration model to those obtained using the analytical model. The results are found in good agreement up to a radius tomore » half spacing ratio of 0.5-0.6, depending on the permittivity of the dielectric used, within the characteristics of many commercial cables. We observe that for typical relative permittivities encountered in braided cables, the transfer elastance values are essentially the same as those of free space; the self-elastance values are also approximated by the free space solution as long as the dielectric discontinuity is taken into account for the planar mode.« less
First Principles Model of Electric Cable Braid Penetration with Dielectrics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campione, Salvatore; Warne, Larry Kevin; Langston, William L.
In this study, we report the formulation to account for dielectrics in a first principles multipole-based cable braid electromagnetic penetration model. To validate our first principles model, we consider a one-dimensional array of wires, which can be modeled analytically with a multipole-conformal mapping expansion for the wire charges; however, the first principles model can be readily applied to realistic cable geometries. We compare the elastance (i.e. the inverse of the capacitance) results from the first principles cable braid electromagnetic penetration model to those obtained using the analytical model. The results are found in good agreement up to a radius tomore » half spacing ratio of 0.5-0.6, depending on the permittivity of the dielectric used, within the characteristics of many commercial cables. We observe that for typical relative permittivities encountered in braided cables, the transfer elastance values are essentially the same as those of free space; the self-elastance values are also approximated by the free space solution as long as the dielectric discontinuity is taken into account for the planar mode.« less
Status and availability of FCC hardware
NASA Technical Reports Server (NTRS)
Romriell, G. K.
1973-01-01
The source availability of FCC and/or FCC connectors was surveyed. The results for the following areas are presented: (1) cost of FCC versus standard round cable, (2) qualification status, (3) size of wire available in FCC, (4) availability of hermetic connectors for FCC, (5) conversion from flat cable to round cable and visa versa, (6) availability of shielded flat cable for RF usage, (7) termination techniques, and (8) repair techniques.
1986-05-01
integral fuel tanks, the various conductors in the fuel systems (e.g. pipes, fuel gauge wiring etc.) can be a fuel explosion risk of very high currents...without sparking. The energy contained in the sparking is most certainly a grave fuel explosion risk . Similar hazards must be avoided with any wiring or...conductors parallel to the cable, transmission lines can be formed. This mehod can only be used for shielded cables. The shield must be accessible somewhere
Analytical prediction of digital signal crosstalk of FCC
NASA Technical Reports Server (NTRS)
Belleisle, A. P.
1972-01-01
The results are presented of study effort whose aim was the development of accurate means of analyzing and predicting signal cross-talk in multi-wire digital data cables. A complete analytical model is developed n + 1 wire systems of uniform transmission lines with arbitrary linear boundary conditions. In addition, a minimum set of parameter measurements required for the application of the model are presented. Comparisons between cross-talk predicted by this model and actual measured cross-talk are shown for a six conductor ribbon cable.
78 FR 16198 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-14
... determine if wires touch the upper surface of the center upper auxiliary fuel tank, and marking the location, as necessary; inspecting all wire bundles above the center upper auxiliary fuel tank for splices and... requires inspecting to determine if wires touch the upper surface of the center upper auxiliary fuel tank...
78 FR 4055 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
...) Installation of New Relay and Wiring Bundle Change Within 24 months after the effective date of this AD: Change... requires installing a new relay and doing certain wiring changes of the entertainment control switch. We... proposed to require installing a new relay and doing certain wiring changes of the entertainment control...
Moving Large Wiring-Harness Boards
NASA Technical Reports Server (NTRS)
Shepherd, Samuel D.; Gurman, Isaac
1990-01-01
Carrier for wiring-harness fabrication boards enables lone operator to move board easily and safely. Holds harness while operator fabricating, while being stored, and being transported to equipment frame for mounting. When positioned for assembly of wiring harness, board and carrier give operator easy and convenient access to wires and cables, when positioned for transfer of wiring harness to or from storage area, carrier holds board securely while moved by one person.
High-Density Terminal Box for Testing Wire Harness
NASA Technical Reports Server (NTRS)
Pierce, W. B.; Collins, W. G.
1982-01-01
Compact terminal box provides access to complex wiring harnesses for testing. Box accommodates more than twice as many wires as previous boxes. Box takes in wires via cable connectors and distributes them to contacts on box face. Instead of separate insulated jacks in metal face panel, box uses pairs of small military-standard metal sockets in precision-drilled plastic panel. Shorting plug provides continuity for wires when not being tested.
An Apparatus for Monitoring the Health of Electrical Cables
NASA Technical Reports Server (NTRS)
Pai, Devdas M.; Tatum, Paul; Pace, Rachel
2004-01-01
As with most elements of infrastructure, electrical wiring is innocuous; usually hidden away and unnoticed until it fails. Failure of infrastructure, however, sometimes leads to serious health and safety hazards. Electrical wiring fails when the polymeric (usually rubber) insulation material that sheathes the conductor gets embrittled with age from exposure to pressure, temperature or radiation cycling or when the insulation gets removed by the chafing of wires against each other. Miles of such wiring can be found in typical aircraft, with significant lengths of the wiring immersed in aviation fuel - a recipe for an explosion if a spark were to occur. Diagnosing the health of wiring is thus an important aspect of monitoring the health of aging aircraft. Stress wave propagation through wiring affords a quick and non-invasive method for health monitoring. The extent to which a stress wave propagating through the cable core gets attenuated depends on the condition of the surrounding insulation. When the insulation is in good condition - supple and pliable, there is more damping or attenuation of the waveform. As the insulation gets embrittled and cracked, the attenuation is likely to reduce and the waveform of the propagating stress wave is likely to change. The monitoring of these changes provides a potential tool to evaluate wiring or cabling in service that is not accessible for visual inspection. This experiment has been designed for use in an introductory mechanical or materials engineering instrumentation lab. Initial setup (after procuring all the materials) should take the lab instructor about 4 hours. A single measurement can be initiated and saved to disk in less than 3 minutes, allowing for all the students in a typical lab section to take their own data rather than share a single set of data for the entire class.
Effect of quasi-hydrostatical radial pressure on Ic of Nb3Sn wires
NASA Astrophysics Data System (ADS)
Mondonico, G.; Seeber, B.; Ferreira, A.; Bordini, B.; Oberli, L.; Bottura, L.; Ballarino, A.; Flükiger, R.; Senatore, C.
2012-11-01
High-performance Nb3Sn conductors are intended to be used in large-scale magnets like the International Thermonuclear Experimental Reactor (ITER) and in the upgrade of the Large Hadron Collider (LHC). Due to the occurrence of high electromagnetic forces, a detailed knowledge of the response of the critical current to the three-dimensional mechanical loads acting on the wires inside the cables is required. A detailed analysis of transverse stress effects on the critical current for powder-in-tube and bronze route Nb3Sn wires is presented. In an earlier publication, we have described the effect of transverse stress exerted on a Nb3Sn wire by means of two parallel plates. In the present paper, we analyse the effect of transverse stress exerted simultaneously by four walls on a wire being confined in a U-shaped groove. In order to get a more realistic picture of the situation of wires embedded in a Rutherford cable, the compression by four walls was also performed after impregnating the wire with epoxy in the same U-shaped groove. The result is very different from the case of pressing by means of two walls: the effect of pressure on Ic is now strongly reduced, which is attributed to the almost hydrostatic pressure in the U-shaped groove. This is further confirmed by the comparison between the effects of axial and transverse loads on the upper critical field and the pinning force. The present data are also compared against the effects of mechanical load on the critical current of cables in large-scale magnets.
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-line wiring diagram of the power system, supported, by cable lists, panelboard summaries, and other... computed operating loads for each condition of operation. (c) Elementary and isometric or deck wiring plans...) Manual alarm system; and (11) Supervised patrol system. (d) Deck wiring or schematic plans of power...
Thermoelectric device with multiple, nanometer scale, elements
NASA Technical Reports Server (NTRS)
Fleurial, Jean-Pierre (Inventor); Ryan, Margaret A. (Inventor); Borshchevsky, Alexander (Inventor); Herman, Jennifer (Inventor)
2006-01-01
A thermoelectric device formed of nanowires on the nm scale. The nanowires are preferably of a size that causes quantum confinement effects within the wires. The wires are connected together into a bundle to increase the power density.
Gentle arrester for moving bodies
NASA Technical Reports Server (NTRS)
Hull, R. A.
1981-01-01
Wire cable absorbs energy at constant rate with reduced shock and rebounding. Cable typically elongates to 90 percent of its potential, but is surrounded by braided sheath to absorb remaining energy should it break prematurely. Applications of arrester include passenger restraint in air and land vehicles, parachute risers, and ground snatch by aircraft. Possible cable material is type 302 stainless steel.
49 CFR 234.219 - Gate arm lights and light cable.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Gate arm lights and light cable. 234.219 Section....219 Gate arm lights and light cable. Each gate arm light shall be maintained in such condition to be properly visible to approaching highway users. Lights and light wire shall be secured to the gate arm. ...
49 CFR 234.219 - Gate arm lights and light cable.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Gate arm lights and light cable. 234.219 Section....219 Gate arm lights and light cable. Each gate arm light shall be maintained in such condition to be properly visible to approaching highway users. Lights and light wire shall be secured to the gate arm. ...
49 CFR 234.219 - Gate arm lights and light cable.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Gate arm lights and light cable. 234.219 Section....219 Gate arm lights and light cable. Each gate arm light shall be maintained in such condition to be properly visible to approaching highway users. Lights and light wire shall be secured to the gate arm. ...
A miniature cable-driven robot for crawling on the heart.
Patronik, N A; Zenati, M A; Riviere, C N
2005-01-01
This document describes the design and preliminary testing of a cable-driven robot for the purpose of traveling on the surface of the beating heart to administer therapy. This methodology obviates mechanical stabilization and lung deflation, which are typically required during minimally invasive cardiac surgery. Previous versions of the robot have been remotely actuated through push-pull wires, while visual feedback was provided by fiber optic transmission. Although these early models were able to perform locomotion in vivo on porcine hearts, the stiffness of the wire-driven transmission and fiber optic camera limited the mobility of the robots. The new prototype described in this document is actuated by two antagonistic cable pairs, and contains a color CCD camera located in the front section of the device. These modifications have resulted in superior mobility and visual feedback. The cable-driven prototype has successfully demonstrated prehension, locomotion, and tissue dye injection during in vitro testing with a poultry model.
Roles of type II myosin and a tropomyosin isoform in retrograde actin flow in budding yeast
Huckaba, Thomas M.; Lipkin, Thomas; Pon, Liza A.
2006-01-01
Retrograde flow of cortical actin networks and bundles is essential for cell motility and retrograde intracellular movement, and for the formation and maintenance of microvilli, stereocilia, and filopodia. Actin cables, which are F-actin bundles that serve as tracks for anterograde and retrograde cargo movement in budding yeast, undergo retrograde flow that is driven, in part, by actin polymerization and assembly. We find that the actin cable retrograde flow rate is reduced by deletion or delocalization of the type II myosin Myo1p, and by deletion or conditional mutation of the Myo1p motor domain. Deletion of the tropomyosin isoform Tpm2p, but not the Tpm1p isoform, increases the rate of actin cable retrograde flow. Pretreatment of F-actin with Tpm2p, but not Tpm1p, inhibits Myo1p binding to F-actin and Myo1p-dependent F-actin gliding. These data support novel, opposing roles of Myo1p and Tpm2 in regulating retrograde actin flow in budding yeast and an isoform-specific function of Tpm1p in promoting actin cable function in myosin-driven anterograde cargo transport. PMID:17178912
Superconducting cable-in-conduit low resistance splice
Artman, Thomas A.
2003-06-24
A low resistance splice connects two cable-in-conduit superconductors to each other. Dividing collars for arranging sub-cable units from each conduit are provided, along with clamping collars for mating each sub-cable wire assembly to form mated assemblies. The mated assemblies ideally can be accomplished by way of splicing collar. The mated assemblies are cooled by way of a flow of coolant, preferably helium. A method for implementing such a splicing is also described.
Cappell, Mitchell S
2010-04-01
BACKGROUND The endoscopy unit before remediation may be a high-risk area for slip and fall injuries due to a large number of exposed above-the-floor wires in the endoscopy rooms, dimmed lighting during endoscopic procedures, and staff inattention to obstacles due to preoccupation with the endoscopic patient. AIM To describe a novel, previously unappreciated workplace hazard to endoscopic personnel: Exposed wires in the endoscopy unit.METHODS This study is a retrospective review of 110,000 endoscopic procedures performed during the last 5 years at an academic, teaching hospital with a high-volume endoscopy unit. All significant orthopedic injuries to endoscopic personnel from slips, twists, and falls from tripping over exposed cords in the endoscopy unit were reviewed. The severity of injury was documented based on roentgenographic findings, number of days of missed work, number of days with a modified work schedule, and requirement for orthopedic surgery. The number of potentially exposed cords per endoscopy room was determined. RESULTS During the 5-year study period, three endoscopic personnel suffered significant orthopedic injuries from slips, twists, and falls from tripping over cords, wires, or tubing lying exposed over the floor in the endoscopy suite: The resulting injuries consisted of fourth and fifth metacarpal hand fractures due to a fall after tripping on oxygen tubing; a rib fracture due to tripping on electrical wires trailing from an endoscopy cart; and a grade II ankle sprain due to the foot becoming entangled in oxygen tubing. All injuries resulted in lost days of work [mean 9.3 +/- 11.0 (SD) days] and in additional days of restricted work (mean 41.7 +/- 31.8 days). One injury required orthopedic surgery. Hospital review revealed a mean of 35.3 +/- 7.5 cords, wires, or tubing per endoscopy procedure room, the majority of which were exposed above the floor before remediation (n = 10 rooms). Remediation of exposed wires included: bundling related wires together in a cable to reduce the number of independent wires, covering exposed wires on the floor with a nonslip heavy mat, and running wires from ceiling outlets to equipment high above ground (e.g. mounted endoscopy video monitors). CONCLUSIONS Tripping, slipping, and falling over exposed wires can cause significant injury to endoscopic personnel. This previously undescribed hazard should be preventable by simple remediation, and all endoscopic personnel, hospital architects, hospital administrators, and governmental regulators should be alerted to this potential hazard
Code of Federal Regulations, 2013 CFR
2013-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
Code of Federal Regulations, 2014 CFR
2014-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
46 CFR 111.105-17 - Wiring methods for hazardous locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Wiring methods for hazardous locations. 111.105-17... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations § 111.105-17 Wiring methods for... made with dust-tight cable entrance seals approved for the installation. [CGD 94-108, 61 FR 28284, June...
High temperature superconductors as a technological discontinuity in the power cable industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beales, T.P.; McCormack, J.S.
1994-12-31
The advent of superconductivity above 77 K represents to the power cable industry a technological discontinuity analogous to that seen in the copper telecommunications industry by the arrival of optical fibres. This phenomenon is discussed along with technical criteria and performance targets needed for high temperature superconducting wire to have an economic impact in transmission cables.
77 FR 24147 - Drawbridge Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... eight wire rope lifting cables that operate the lift span. This deviation allows the bridge to remain in the closed position while the lift cables are replaced. DATES: This deviation is effective from 10 p.m... cables that operate the lift span are replaced. The closure period will start at 10 p.m. on or about May...
77 FR 28488 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... lifting cables that operate the lift span. This deviation allows the bridge to remain in the closed position while the lift cables are replaced. DATES: This deviation is effective from 9 a.m. to 3 p.m. on or... wire rope lifting cables that operate the lift span are replaced. The closure period will be from 9 a.m...
High temperature superconductors as a technological discontinuity in the power cable industry
NASA Technical Reports Server (NTRS)
Beales, T. P.; Mccormack, J. S.
1995-01-01
The advent of superconductivity above 77 K represents to the power cable industry a technological discontinuity analogous to that seen in the copper telecommunications industry by the arrival of optical fibers. This phenomenon is discussed along with technical criteria and performance targets needed for high temperature superconducting wire to have an economic impact in transmission cables.
Static Dissipative Cable Ties, Such as for Radiation Belt Storm Probes
NASA Technical Reports Server (NTRS)
Langley, Patrick T. (Inventor); Siddique, Fazle E. (Inventor)
2015-01-01
An article, such as, but not limited to, a cable strap to wrap, support, or secure one or more wires or cables, is formed by cyclically heating and cooling and/or irradiating an article formed of a static dissipative ethylene tetrafluoroethylen (ETFE) resin, to reduce an electrical resistivity and/or to increase a tensile strength of the article.
Fiber-optics couple arthroscope to TV
NASA Technical Reports Server (NTRS)
Franke, J. M.; Rhodes, D. B.
1981-01-01
Convenient, hand-held coupler images output of arthroscope onto coherent fiber bundle. Arthroscope allows surgeons to examine internal organs through any small opening in body. Coupler is also used for engine inspection, instrument repair, and around-corner visual inspection. Image from arthroscope travels along flexible bundle and appears at other cable end where it is recollimated by lens. Image is read from lens or projected on color TV camera.
The Performance of Aircraft Control Cables Under Service Conditions
1976-04-01
wires in the cables is illustr;tcd in Ifigs. I ald 2. Fatigue tests were also carried out on samples of galvanised steel cable (5 cwt. (2.49kN) minimumil...sheave ratio using the MIL-C-151I cable of 2.38 mm (3:32 in.) diameter would have been 13.3. For a satisfactory fatigue performance for 7 x 19 galvanised ...critical region in which cable life is relatively low". Reference 13 recommends a sheave ratio of 18 for 7 x 19 galvanised and stainless ,ables and a
TEM Cell Testing of Cable Noise Reduction Techniques from 2 MHz to 200 MHz -- Part 2
NASA Technical Reports Server (NTRS)
Bradley, Arthur T.; Evans, William C.; Reed, Joshua L.; Shimp, Samuel K., III; Fitzpatrick, Fred D.
2008-01-01
This paper presents empirical results of cable noise reduction techniques as demonstrated in a TEM cell operating with radiated fields from 2 - 200 MHz. It is the second part of a two-paper series. The first paper discussed cable types and shield connections. In this second paper, the effects of load and source resistances and chassis connections are examined. For each topic, well established theories are compared to data from a real-world physical system. Finally, recommendations for minimizing cable susceptibility (and thus cable emissions) are presented. There are numerous papers and textbooks that present theoretical analyses of cable noise reduction techniques. However, empirical data is often targeted to low frequencies (e.g. <50 KHz) or high frequencies (>100 MHz). Additionally, a comprehensive study showing the relative effects of various noise reduction techniques is needed. These include the use of dedicated return wires, twisted wiring, cable shielding, shield connections, changing load or source impedances, and implementing load- or source-to-chassis isolation. We have created an experimental setup that emulates a real-world electrical system, while still allowing us to independently vary a host of parameters. The goal of the experiment was to determine the relative effectiveness of various noise reduction techniques when the cable is in the presence of radiated emissions from 2 MHz to 200 MHz.
Space Shuttle Columbia Aging Wiring Failure Analysis
NASA Technical Reports Server (NTRS)
McDaniels, Steven J.
2005-01-01
A Space Shuttle Columbia main engine controller 14 AWG wire short circuited during the launch of STS-93. Post-flight examination divulged that the wire had electrically arced against the head of a nearby bolt. More extensive inspection revealed additional damage to the subject wire, and to other wires as well from the mid-body of Columbia. The shorted wire was to have been constructed from nickel-plated copper conductors surrounded by the polyimide insulation Kapton, top-coated with an aromatic polyimide resin. The wires were analyzed via scanning electron microscope (SEM), energy dispersive X-Ray spectroscopy (EDX), and electron spectroscopy for chemical analysis (ESCA); differential scanning calorimetry (DSC) and thermal gravimetric analysis (TGA) were performed on the polyimide. Exemplar testing under laboratory conditions was performed to replicate the mechanical damage characteristics evident on the failed wires. The exemplar testing included a step test, where, as the name implies, a person stepped on a simulated wire bundle that rested upon a bolt head. Likewise, a shear test that forced a bolt head and a torque tip against a wire was performed to attempt to damage the insulation and conductor. Additionally, a vibration test was performed to determine if a wire bundle would abrade when vibrated against the head of a bolt. Also, an abrasion test was undertaken to determine if the polyimide of the wire could be damaged by rubbing against convolex helical tubing. Finally, an impact test was performed to ascertain if the use of the tubing would protect the wire from the strike of a foreign object.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastouret, Alan; Gooijer, Frans; Overton, Bob
High Temperature insulated wire and optical fiber cable is a key enabling technology for the Geothermal Technologies Program (GTP). Without insulated electrical wires and optical fiber, downhole temperature and pressure sensors, flow meters and gauges cannot communicate with the surface. Unfortunately, there are currently no insulated electrical wire or fiber cable constructions capable of surviving for extended periods of deployment in a geothermal well (240-325°C) or supercritical (374°C) reservoir. This has severely hindered engineered reservoir creation, management and utilization, as hot zones and cool water intrusions cannot be understood over time. The lack of a insulated electrical wire and fibermore » cable solution is a fundamental limitation to the viability of this energy source. The High Temperature Downhole Tools target specification is development of tools and sensors for logging and monitoring wellbore conditions at depths of up to 10,000 meters and temperatures up to 374oC. It well recognized in the industry that no current electronic or fiber cable can be successfully deployed in a well and function successfully for more a few days at temperatures over 240oC. The goal of this project was to raise this performance level significantly. Prysmian Group’s objective in this project was to develop a complete, multi-purpose cable solution for long-term deployment in geothermal wells/reservoirs that can be used with the widest variety of sensors. In particular, the overall project objective was to produce a manufacturable cable design that can perform without serious degradation: • At temperatures up to 374°C; • At pressures up to 220 bar; • In a hydrogen-rich environment; and • For the life of the well (> 5 years). This cable incorporates: • Specialty optical fibers, with specific glass chemistry and high temperature and pressure protective coatings for data communication and distributed temperature and pressure sensing, and • High-temperature insulated wire conductors Prysmian Group has developed a geothermal fiber optic cable (GFOC) solution which incorporates novel glass chemistry for optical fibers to operate at the required bandwidths in high temperature/high pressure hydrogen rich environments with fiber protection, high temperature insulated conductors and protective cladding for cable components. The cable solution has been tested in a geothermal installation for 10 months. The electrical insulation and optical fibers have been validated through laboratory testing to ensure successful operation for greater than 5 years at 300°C, with the possibility of higher temperatures depending on the particular well environment. With the 300°C optical fiber and electrical insulation developments completed and validated in laboratory tests the greatest challenge to a complete 300°C cable solution was protecting the optical fibers in the cable. Optical fibers are typically incased in a protective tube where the tube is filled with a gel. The gel serves as mechanical protection, prevent moisture ingress, and can include hydrogen scavenging materials. A suitable gel for use at 300°C could not be identified and an industrialized alternative was not fully attained. Despite the problems encountered and the lower long-term operating temperature of the cable solution, the project showed success in developing a complete cable solution for a large portion of the geothermal wells in operation today. Further work to obtain the higher long-term temperature goal of the project can be achieved based on the knowledge gained in the current project. This project is significant for many reasons including the new materials science, manufacturing technology, energy independence, and jobs created and will create.« less
Environmental Influence of Gravity and Pressure on Arc Tracking of Insulated Wires Investigated
NASA Technical Reports Server (NTRS)
2005-01-01
Momentary short-circuit arcs between a defective polyimide-insulated wire and another conductor may thermally char (pyrolize) the insulating material. The charred polyimide, being conductive, can sustain the short-circuit arc, which may propagate along the wire through continuous pyrolization of the polyimide insulation (arc tracking). If the arcing wire is part of a multiple-wire bundle, the polyimide insulation of other wires within the bundle may become thermally charred and start arc tracking also (flash over). Such arc tracking can lead to complete failure of an entire wire bundle, causing other critical spacecraft or aircraft failures. Unfortunately, all tested candidate wire insulations for aerospace vehicles were susceptible to arc tracking. Therefore, a test procedure was designed at the NASA Lewis Research Center to select the insulation type least susceptible to arc tracking. This test procedure addresses the following three areas of concern: (1) probability of initiation, (2) probability of reinitiation (restrike), and (3) extent of arc tracking damage (propagation rate). Item 2 (restrike probability) is an issue if power can be terminated from and reapplied to the arcing wire (by a switch, fuse, or resettable circuit breaker). The degree of damage from an arcing event (item 3) refers to how easily the arc chars nearby insulation and propagates along the wire pair. Ease of nearby insulation charring can be determined by measuring the rate of arc propagation. Insulation that chars easily will propagate the arc faster than insulation that does not char very easily. A popular polyimide insulated wire for aerospace vehicles, MIL-W-81381, was tested to determine a degree of damage from an arcing event (item 3) in the following three environments: (1) microgravity with air at 1-atm pressure, (2) 1g with air at 1 atm, and (3) 1g within a 10^-6 Torr vacuum. The microgravity 1-atm air was the harshest environment, with respect to the rate of damage of arc tracking, for the 20 AWG (American Wiring Gauge) MIL-W-81381 wire insulation type . The vacuum environment resulted in the least damage. Further testing is planned to determine if the environmental results are consistent between insulation types and to evaluate the other two parameters associated with arc tracking susceptibility.
NASA Astrophysics Data System (ADS)
Paul, Clayton R.
1991-06-01
Crosstalk is the unintentional electromagnetic coupling between circuits which are connected by parallel conductors that lie in close proximity to each other. Some examples are wires in cable harnesses or metallic lands on printed-circuit boards (PCB's). This unintended interaction between two or more circuits via their electromagnetic fields can cause interference problems. Signals from one circuit that couple to another circuit appear at the terminals of the devices that are interconnected by the wires. If these signals are of sufficient magnitude or spectral content, they may cause unintended operation of the device or a degradation in its performance. A summary of the standard models used for predicting crosstalk in various types of configurations is presented. The discussion focusses on the relative accuracies, regions of applicability, and computational complexity of the models. A simple explanation of the ability (or inability) of shielded wires and twisted pairs of wires to reduce the crosstalk is also given.
1982-11-01
Comunicaciones , S.A. Arlington. TX Zarogoza, Spain Albany International Corporation Camden Wire Co., Inc. Chatham. NY Camden. NY Alcan Aluminio Do... COMUNICACIONES , S.A. ZARAGOZA (SPAIN) ABSIRACT the object of this paper. Fiq. I show the tradltio- Seo hnal schematic diagram of analoqical measurements of...power sum: ACKNOWLEDGMENT F2 F2 FN F(fo,!.o)dB = i0logi0 + 10 + ... IOT ) The authors qish to thank the people of Cables de Comunicaciones S.A. for
1992-11-01
confirmed for same group delay, and thus no dispersion will arise. fiber. However, if birefringence arises due to stress resulting from non -circularity...55 nF/KM OTHER MATERIALS M -75 nF/KM X - NON STD. 0 - STRANDED STEEL WIRES CORE MESSENGER (S.S.CABLE) 4,4 STRANDING: C - CONVENTIONAL STRANDING ( GROUP ...evaluated, and the process control automated [7]. Therefore, additional work is needed to method for lines is confirmed. Based on the experimental
NASA Technical Reports Server (NTRS)
Studor, George
2010-01-01
The presentation reviews what is meant by the term 'fly-by-wireless', common problems and motivation, provides recent examples, and examines NASA's future and basis for collaboration. The vision is to minimize cables and connectors and increase functionality across the aerospace industry by providing reliable, lower cost, modular, and higher performance alternatives to wired data connectivity to benefit the entire vehicle/program life-cycle. Focus areas are system engineering and integration methods to reduce cables and connectors, vehicle provisions for modularity and accessibility, and a 'tool box' of alternatives to wired connectivity.
Development of 66 kV class REBCO superconducting cable
NASA Astrophysics Data System (ADS)
Ohya, M.; Masuda, T.; Amemiya, N.; Ishiyama, A.; Ohkuma, T.
Sumitomo Electric Industries (SEI) has been involved in the development of 66 kV/5 kA-class HTS cables using REBCO wires. One of the technical targets was to reduce the AC loss to less than 2 W/m/phase at 5 kA. SEI developed a clad-type textured metal substrate with lower magnetization loss than NiW substrates. REBCO wires of 30 mm wide were slit into 4 mm-wide strips, and these strips were wound spirally on a former with small gaps. The measured AC loss of the manufactured cable was 1.8 W/m/phase at 5 kA, achieving the AC loss goal. Another important target was to manage fault current. The copper protection layers were designed based on simulation findings. Fault current tests (max. 31.5 kA, 2 sec) showed that the designed HTS cable has the required withstanding performance. The development of the elemental technologies was finished on schedule, and a 15 m-long HTS cable system will be constructed to demonstrate that it meets all the required specifications.
High-Density Superconducting Cables for Advanced ACTPol
NASA Astrophysics Data System (ADS)
Pappas, C. G.; Austermann, J.; Beall, J. A.; Duff, S. M.; Gallardo, P. A.; Grace, E.; Henderson, S. W.; Ho, S. P.; Koopman, B. J.; Li, D.; McMahon, J.; Nati, F.; Niemack, M. D.; Niraula, P.; Salatino, M.; Schillaci, A.; Schmitt, B. L.; Simon, S. M.; Staggs, S. T.; Stevens, J. R.; Vavagiakis, E. M.; Ward, J. T.; Wollack, E. J.
2016-07-01
Advanced ACTPol (AdvACT) is an upcoming Atacama Cosmology Telescope (ACT) receiver upgrade, scheduled to deploy in 2016, that will allow measurement of the cosmic microwave background polarization and temperature to the highest precision yet with ACT. The AdvACT increase in sensitivity is partly provided by an increase in the number of transition-edge sensors (TESes) per array by up to a factor of two over the current ACTPol receiver detector arrays. The high-density AdvACT TES arrays require 70 \\upmu m pitch superconducting flexible cables (flex) to connect the detector wafer to the first-stage readout electronics. Here, we present the flex fabrication process and test results. For the flex wiring layer, we use a 400-nm-thick sputtered aluminum film. In the center of the cable, the wiring is supported by a polyimide substrate, which smoothly transitions to a bare (uncoated with polyimide) silicon substrate at the ends of the cable for a robust wedge wire-bonding interface. Tests on the first batch of flex made for the first AdvACT array show that the flex will meet the requirements for AdvACT, with a superconducting critical current above 1 mA at 500 mK, resilience to mechanical and cryogenic stress, and a room temperature yield of 97 %.
High-Density Superconducting Cables for Advanced ACTPol
NASA Technical Reports Server (NTRS)
Pappas, C. G.; Austermann, J.; Beall, J. A.; Duff, S. M.; Gallardo, P. A.; Grace, E.; Henderson, S. W.; Ho, S. P.; Koopman, B. J.; Li, D.;
2016-01-01
Advanced ACTPol (AdvACT) is an upcoming Atacama Cosmology Telescope (ACT) receiver upgrade, scheduled to deploy in 2016, that will allow measure- ment of the cosmic microwave background polarization and temperature to the highest precision yet with ACT. The AdvACT increase in sensitivity is partly provided by an increase in the number of transition-edge sensors (TESes) per array by up to a factor of two over the current ACTPol receiver detector arrays. The high-density AdvACT TES arrays require 70 µ m pitch superconducting flexible cables (flex) to connect the detec- tor wafer to the first-stage readout electronics. Here, we present the flex fabrication process and test results. For the flex wiring layer, we use a 400-nm-thick sputtered alu- minum film. In the center of the cable, the wiring is supported by a polyimide substrate, which smoothly transitions to a bare (uncoated with polyimide) silicon substrate at the ends of the cable for a robust wedge wire-bonding interface. Tests on the first batch of flex made for the first AdvACT array show that the flex will meet the requirements for AdvACT, with a superconducting critical current above 1 mA at 500 mK, resilience to mechanical and cryogenic stress, and a room temperature yield of 97%.
Matsumori, Hiroaki; Ueda, Yurito; Koizumi, Munehisa; Miyazaki, Kiyoshi; Shigematsu, Hideki; Satoh, Nobuhisa; Oshima, Takuya; Tanaka, Masato; Tanaka, Yasuhito; Takakura, Yoshinori
2010-02-01
Wires and cables have been used extensively for spinal sublaminar wiring, but damages to the spinal cord due to compression by metal wires have been reported. We have used more flexible ultra-high-molecular-weight polyethylene cable (Tekmilon tape) instead of metal wires since 1999 and have obtained good clinical outcomes. Although the initial strength of Tekmilon tape is equivalent to metal wires, the temporal changes in the strength of Tekmilon tape in the body should be investigated to show that sufficient strength is maintained over time until bone union is complete. Tekmilon tape was embedded into the paravertebral muscle of 10-week-old male Japanese white rabbits. Samples were embedded for 0, 1, 3, 6 or 12 months. At the end of each period, sequential straight tensile strength and sequential knot-pull tensile strength were measured. The initial strength of Tekmilon tape in muscle tissue was maintained over time, with 92% straight tensile strength and 104% knot-pull tensile strength at 6months, and values of 77% and 100% at 12 months, respectively. Since single knot is clinically relevant, it is very important that the knot-pull tensile strength did not decrease over a 12-month period. This suggests that temporal changes in the tensile strength of Tekmilon tape are negligible at 1 year. Tekmilon tape maintains sufficient strength in vivo until bone union has occurred. It is useful for sublaminar wiring instead of metal materials due to its flexibility and strength and may reduce the risk of neurological damage. Copyright (c) 2009 Elsevier Ltd. All rights reserved.
Manchester Coding Option for SpaceWire: Providing Choices for System Level Design
NASA Technical Reports Server (NTRS)
Rakow, Glenn; Kisin, Alex
2014-01-01
This paper proposes an optional coding scheme for SpaceWire in lieu of the current Data Strobe scheme for three reasons. First reason is to provide a straightforward method for electrical isolation of the interface; secondly to provide ability to reduce the mass and bend radius of the SpaceWire cable; and thirdly to provide a means for a common physical layer over which multiple spacecraft onboard data link protocols could operate for a wide range of data rates. The intent is to accomplish these goals without significant change to existing SpaceWire design investments. The ability to optionally use Manchester coding in place of the current Data Strobe coding provides the ability to DC balanced the signal transitions unlike the SpaceWire Data Strobe coding; and therefore the ability to isolate the electrical interface without concern. Additionally, because the Manchester code has the clock and data encoded on the same signal, the number of wires of the existing SpaceWire cable could be optionally reduced by 50. This reduction could be an important consideration for many users of SpaceWire as indicated by the already existing effort underway by the SpaceWire working group to reduce the cable mass and bend radius by elimination of shields. However, reducing the signal count by half would provide even greater gains. It is proposed to restrict the data rate for the optional Manchester coding to a fixed data rate of 10 Megabits per second (Mbps) in order to make the necessary changes simple and still able to run in current radiation tolerant Field Programmable Gate Arrays (FPGAs). Even with this constraint, 10 Mbps will meet many applications where SpaceWire is used. These include command and control applications and many instruments applications with have moderate data rate. For most NASA flight implementations, SpaceWire designs are in rad-tolerant FPGAs, and the desire to preserve the heritage design investment is important for cost and risk considerations. The Manchester coding option can be accommodated in existing designs with only changes to the FPGA.
Manufacturing and quality control of interconnecting wire harnesses, Volume 2
NASA Technical Reports Server (NTRS)
1972-01-01
Interconnecting wire harnesses defined in the design standard are considered, including type 4, open bundle (not enclosed). Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated into the document.
Code of Federal Regulations, 2011 CFR
2011-10-01
... television stations, and wired and wireless cable television systems, DBS, DTV, SDARS, digital cable and DAB, and wireline video systems. (d) Wireline Video System. The system of a wireline common carrier used to provide video programming service. (e) Participating National (PN). PN stations are broadcast stations...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Scope. 76.801 Section 76.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.801 Scope. The provisions of this subpart set forth rules and...
Manned spacecraft electrical fire safety
NASA Technical Reports Server (NTRS)
Wardell, A. W.
1971-01-01
The fire hazards created in spacecraft compartments by malfunction of electrical wiring are described. The tests for electrical wire/cable current overload flammability are presented. The application of electrical and material technologies to the reduction of fire hazards in spacecraft are examined.
5. Within building #5, the forming of chain from wire, ...
5. Within building #5, the forming of chain from wire, as well as other operations, was powered by such belt-driven wheels and shafts. - American Chain & Cable Company, East Princess Street (400 Block), York, York County, PA
Code of Federal Regulations, 2012 CFR
2012-10-01
... withstand and operate in excess of the breaking strength of the strongest section or wire to be used in any... application of a load equal to the nominal breaking strength of the strongest section or wire rope to be used... or for trailing objects, where the wire rope or cable is payed out beneath the surface and becomes...
Code of Federal Regulations, 2014 CFR
2014-10-01
... withstand and operate in excess of the breaking strength of the strongest section or wire to be used in any... application of a load equal to the nominal breaking strength of the strongest section or wire rope to be used... or for trailing objects, where the wire rope or cable is payed out beneath the surface and becomes...
Code of Federal Regulations, 2013 CFR
2013-10-01
... withstand and operate in excess of the breaking strength of the strongest section or wire to be used in any... application of a load equal to the nominal breaking strength of the strongest section or wire rope to be used... or for trailing objects, where the wire rope or cable is payed out beneath the surface and becomes...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, Mark R.; Poole, Henry J.; Custer, III, Arthur W.
A sputtering apparatus that includes at least a target presented as an inner surface of a confinement structure, the inner surface of the confinement structure is preferably an internal wall of a circular tube. A cathode is disposed adjacent the internal wall of the circular tube. The cathode preferably provides a hollow core, within which a magnetron is disposed. Preferably, an actuator is attached to the magnetron, wherein a position of the magnetron within the hollow core is altered upon activation of the actuator. Additionally, a carriage supporting the cathode and communicating with the target is preferably provided, and amore » cable bundle interacting with the cathode and linked to a cable bundle take up mechanism provided power and coolant to the cathode, magnetron, actuator and an anode of the sputtering apparatus.« less
The Bottom Line: Cable Telegraphy and the Rise of Field Theory in the Victorian British Empire
NASA Astrophysics Data System (ADS)
Hunt, Bruce
The networks of telegraph wires and undersea cables that began to spread across the world in the 1840s and 1850s had far-reaching effects on commerce and the dissemination of news. They also had deep effects on electrical science. In this paper, I will argue that what might at first appear to be a prime example of pure science--the development of electromagnetic field theory in Britain in the middle decades of the 19th century--was in fact driven in important ways by developments in the telegraph industry, particularly British scientists' and engineers' encounters with puzzling new phenomenon of the `retardation' of signals that turned up on underground wires and undersea cables in the early 1850s.
Space Station Freedom primary power wiring requirements
NASA Technical Reports Server (NTRS)
Hill, Thomas J.
1994-01-01
The Space Station Freedom (SSF) Program requirements are a 30 year reliable service life in low Earth orbit in hard vacuum or pressurized module service without detrimental degradation. Specific requirements are outlined in this presentation for SSF primary power and cable insulation. The primary power cable status and the WP-4 planned cable test program are also reviewed along with Rocketdyne-WP04 prime insulation candidates.
Nb 3Sn RRP® strand and Rutherford cable development for a 15 T dipole demonstrator
Barzi, E.; Andreev, N.; Li, P.; ...
2016-03-16
Keystoned Rutherford cables made of 28 strands and with a stainless steel core were developed and manufactured using 1 mm Nb3Sn composite wires produced by Oxford Superconducting Technology with 127 and 169 restacks using the Restacked-Rod-Process ®. Furthermore, the performance and properties of these cables were studied to evaluate possible candidates for 15 T accelerator magnets.
NASA Technical Reports Server (NTRS)
Dawe, R. H.; Arnett, J. C.
1974-01-01
Electronic packaging and cabling activities performed in support of the Thermoelectric Outer Planets Spacecraft (TOPS) Advanced Systems Technology (AST) project are detailed. It describes new electronic compartment, electronic assembly, and module concepts, and a new high-density, planar interconnection technique called discrete multilayer (DML). Development and qualification of high density cabling techniques, using small gage wire and microminiature connectors, are also reported.
Method for fabricating multi-strand superconducting cable
Borden, A.R.
1985-04-01
Multi-strand superconducting cables adapted to be used, for example, to wind a magnet are fabricated by directing wire strands inwardly from spools disposed on the perimeter of a rotating disk and wrapping them diagonally around a tapered mandrel with a flattened cross-sectional shape with a core having a wedge-shaped channel. As the cable is pulled axially, flexibly coupled wedge-shaped pieces are continuously passed through the channel in the mandrel and inserted into the cable as an internal support therefor.
Apparatus and method for fabricating multi-strand superconducting cable
Borden, Albert R.
1986-01-01
Multi-strand superconducting cables adapted to be used, for example, to wind a magnet is fabricated by directing wire strands inwardly from spools disposed on the perimeter of a rotating disk and wrapping them diagonally around a tapered mandrel with a flattened cross-sectional shape with a core having a wedge-shaped channel. As the cable is pulled axially, flexibly coupled wedge-shaped pieces are continuously passed through the channel in the mandrel and inserted into the cable as an internal support therefor.
1983-11-17
PERROS LINK on the overall link losses. Despite recent publications mentioning excellent 4 - CABLE DESIGN laboratory results in splicing monomode fibers...sections were installed in ducts on the aluminum strip lengths available on the between Lannion and Perros -Guirec, two cities which market (standard length...Fig. 5 - MDNOMJDE LINK LANNION- PERROS The new ’micro-ball" technique was used for laying these cables and in particular, for the 5000-meter cable
Woven ribbon cable for cryogenic instruments
NASA Astrophysics Data System (ADS)
Cunningham, C. R.; Hastings, P. R.; Strachan, J. M. D.
Robust woven ribbon cables are described for connecting sensors at low temperatures to higher temperature systems. Woven cables have several advantages over conventional wiring or flat ribbon cables in cryostats: heat sinking is easier; twisted pairs may be used; and miniature multi-way connectors are easily incorporated. Their use is demonstrated in making connections from 131 bolometers in two arrays mounted in a dilution refrigerator at 100 mK. Thermal and electrical properties are discussed, as are other possible applications in cryogenic instruments.
Berend, Keith R; Lombardi, Adolph V; Mallory, Thomas H; Chonko, Douglas J; Dodds, Kathleen L; Adams, Joanne B
2004-10-01
Initial stability is critical for fixation and survival of cementless total hip arthroplasty. Occasionally, a split of the calcar occurs intraoperatively. A review of 1,320 primary total hip arthroplasties with 2-year follow-up, performed between August 1985 and February 2001 using the Mallory-Head Porous tapered femoral component, revealed 58 hips in 55 patients with an intraoperative calcar fracture managed with single or multiple cerclage wires or cables and immediate full weight bearing. At 7.5 years average follow-up (range, 2-16 years), there were no revisions of the femoral component, radiographic failures, or patients with severe thigh pain, for a stem survival rate of 100%. Average Harris hip score improvement was 33.8 points. Fracture of the proximal femur occurs in approximately 4% of primary THAs using the Mallory-Head Porous femoral component. When managed intraoperatively with cerclage wire or cable, the mid- to long-term results appear unaffected with 100% femoral component survival at up to 16 years.
Intramuscular Contact Lead Filled With Conductive Solution
NASA Technical Reports Server (NTRS)
Bamford, Robert M.; Hendrickson, James A.
1991-01-01
Proposed sheath for braided-wire intramuscular conductor preserves electrical continuity even if wire breaks. Plastic sheath surrounds conductive solution in which braided wire immersed. At end of cable, wire and sheath crimped together and press-fit in porous titanium electrode. Implanted surgically with aid of device resembling catheter. Used to deliver electrical stimuli to muscles in biomedical research on human and animal physiology, development of prostheses, regeneration of nerves and muscles, and artificial implants.
NASA Astrophysics Data System (ADS)
Weischedel, Herbert R.; Hoehle, Hans-Werner
1995-05-01
Stay cables of cable-stayed bridges have corrosion protection systems that can be elaborate. For example, such a system may simply consist of one or several coats of paint, or--more complex--of plastic pipes that are wrapped with tape and filled with grout. Frequently, these corrosion protection systems prevent visual inspections. Therefore, alternative nondestructive examination methods are called for. For example, modern dual-function electromagnetic (EM) instruments allow the simultaneous detection of external and internal localized flaws (such as external and internal broken wires and corrosion piting) and the measurement of loss of metallic cross-sectional area (typically caused by external or internal corrosion or wear). Initially developed for mining and skiing applications, these instruments have been successfully used for the inspection of stays of cable-stayed bridges, and for the inspection of guys of smoke stacks, flare stacks, broadcast towers, suspended roofs, etc. As a rule, guys and bridge cables are not subjected to wear and bending stresses. However, their safety can be compromised by corrosion caused by the failure of corrosion protection systems. Furthermore, live loads and wind forces create intermittent tensile stresses that can cause fatigue breaks of wires. This paper discusses the use of dual-function EM instruments for the detection and the nondestructive quantitative evaluation of cable deterioration. It explains the underlying principles. Experiences with this method together with field inspection results will be presented.
NASA Astrophysics Data System (ADS)
Ibáñez, Flor; Baltazar, Arturo; Mijarez, Rito; Aranda, Jorge
2015-03-01
Multiwire cables are widely used in important civil structures. Since they are exposed to several dynamic and static loads, their structural health can be compromised. The cables can also be submitted to mechanical contact, tension and energy propagation in addition to changes in size and material within their wires. Due to the critical role played by multiwire cables, it is necessary to develop a non-destructive health monitoring method to maintain their structure and proper performance. Ultrasonic inspection using guided waves is a promising non-destructive damage monitoring technique for rods, single wires and multiwire cables. The propagated guided waves are composed by an infinite number of vibrational modes making their analysis difficult. In this work, an entropy-based method to identify small changes in non-stationary signals is proposed. A system to capture and post-process acoustic signals is implemented. The Discrete Wavelet Transform (DWT) is computed in order to obtain the reconstructed wavelet coefficients of the signals and to analyze the energy at different scales. The feasibility of using the concept of entropy evolution of non-stationary signals to detect damage in multiwire cables is evaluated. The results show that there is a high correlation between the entropy value and damage level of the cable. The proposed method has low sensitivity to noise and reduces the computational complexity found in a typical time-frequency analysis.
Representations of Education in HBO's "The Wire", Season 4
ERIC Educational Resources Information Center
Trier, James
2010-01-01
"The Wire" is a crime drama that aired for five seasons on the Home Box Office (HBO) cable channel from 2002-2008. The entire series is set in Baltimore, Maryland, and as Kinder (2008) points out, "Each season "The Wire" shifts focus to a different segment of society: the drug wars, the docks, city politics, education, and the media" (p. 52). In…
Red Plague Control Plan (RPCP)
NASA Technical Reports Server (NTRS)
Cooke, Robert W.
2010-01-01
SCOPE: Prescribes the minimum requirements for the control of cuprous / cupric oxide corrosion (a.k.a. Red Plague) of silver-coated copper wire, cable, and harness assemblies. PURPOSE: Targeted for applications where exposure to assembly processes, environmental conditions, and contamination may promote the development of cuprous / cupric oxide corrosion (a.k.a. Red Plague) in silver-coated copper wire, cable, and harness assemblies. Does not exclude any alternate or contractor-proprietary documents or processes that meet or exceed the baseline of requirements established by this document. Use of alternate or contractor-proprietary documents or processes shall require review and prior approval of the procuring NASA activity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... cable splice kit which becomes part of a splice. Conductor. A bare or insulated wire or combination of... assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable may also contain one or more uninsulated conductors. Jacket. A nonmetallic abrasion-resistant outer...
Code of Federal Regulations, 2011 CFR
2011-07-01
... cable splice kit which becomes part of a splice. Conductor. A bare or insulated wire or combination of... assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable may also contain one or more uninsulated conductors. Jacket. A nonmetallic abrasion-resistant outer...
47 CFR 76.805 - Access to molding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Access to molding. 76.805 Section 76.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.805 Access to molding. (a) An MVPD shall be permitted...
Present and Probable CATV/Broadband-Communication Technology.
ERIC Educational Resources Information Center
Ward, John E.
The study reports on technical and cost factors affecting future growth of Cable TV (CATV) systems and the development of the "wired nation." Comparisons are made between alternatives for distributing CATV signals and alternative prototypes for subscriber home terminals. Multi-cable, augmented-channel (with converter), and switched CATV…
30 CFR 282.27 - Conduct of operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... lease operator; (2) The area designation based on Official OCS Protraction Diagrams; (3) The block... activities. (2) Disposal of equipment, cables, chains, containers, or other materials into the ocean is... OCS waters; (ii) All cable, chain, or wire segments shall be recovered after use and securely stored...
30 CFR 282.27 - Conduct of operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... lease operator; (2) The area designation based on Official OCS Protraction Diagrams; (3) The block... activities. (2) Disposal of equipment, cables, chains, containers, or other materials into the ocean is... OCS waters; (ii) All cable, chain, or wire segments shall be recovered after use and securely stored...
30 CFR 282.27 - Conduct of operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... lease operator; (2) The area designation based on Official OCS Protraction Diagrams; (3) The block... activities. (2) Disposal of equipment, cables, chains, containers, or other materials into the ocean is... OCS waters; (ii) All cable, chain, or wire segments shall be recovered after use and securely stored...
FireWire: Hot New Multimedia Interface or Flash in the Pan?
ERIC Educational Resources Information Center
Learn, Larry L., Ed.
1995-01-01
Examines potential solutions to the problem of personal computer cabling and configuration and serial port performance, namely "FireWire" (P1394) and "Universal Serial Bus" (USB). Discusses interface design, technical capabilities, user friendliness, compatibility, costs, and future perspectives. (AEF)
Code of Federal Regulations, 2010 CFR
2010-07-01
... or no such training) working on, near, or with the following installations: (1) Premises wiring. Installations of electric conductors and equipment within or on buildings or other structures, and on other... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations...
Fimbrin phosphorylation by metaphase Cdk1 regulates actin cable dynamics in budding yeast
Miao, Yansong; Han, Xuemei; Zheng, Liangzhen; Xie, Ying; Mu, Yuguang; Yates, John R.; Drubin, David G.
2016-01-01
Actin cables, composed of actin filament bundles nucleated by formins, mediate intracellular transport for cell polarity establishment and maintenance. We previously observed that metaphase cells preferentially promote actin cable assembly through cyclin-dependent kinase 1 (Cdk1) activity. However, the relevant metaphase Cdk1 targets were not known. Here we show that the highly conserved actin filament crosslinking protein fimbrin is a critical Cdk1 target for actin cable assembly regulation in budding yeast. Fimbrin is specifically phosphorylated on threonine 103 by the metaphase cyclin–Cdk1 complex, in vivo and in vitro. On the basis of conformational simulations, we suggest that this phosphorylation stabilizes fimbrin's N-terminal domain, and modulates actin filament binding to regulate actin cable assembly and stability in cells. Overall, this work identifies fimbrin as a key target for cell cycle regulation of actin cable assembly in budding yeast, and suggests an underlying mechanism. PMID:27068241
First AC loss test and analysis of a Bi2212 cable-in-conduit conductor for fusion application
NASA Astrophysics Data System (ADS)
Qin, Jinggang; Shi, Yi; Wu, Yu; Li, Jiangang; Wang, Qiuliang; He, Yuxiang; Dai, Chao; Liu, Fang; Liu, Huajun; Mao, Zhehua; Nijhuis, Arend; Zhou, Chao; Devred, Arnaud
2018-01-01
The main goal of the Chinese fusion engineering test reactor (CFETR) is to build a fusion engineering tokamak reactor with a fusion power of 50-200 MW, and plan to test the breeding tritium during the fusion reaction. This may require a maximum magnetic field of the central solenoid and toroidal field coils up to 15 T. New magnet technologies should be developed for the next generation of fusion reactors with higher requirements. Bi2Sr2CaCu2Ox (Bi2212) is considered as a potential and promising superconductor for the magnets in the CFETR. R&D activities are ongoing at the Institute of Plasma Physics, Chinese Academy of Sciences for demonstration of the feasibility of a CICC based on Bi2212 round wire. One sub-size conductor cabled with 42 wires was designed, manufactured and tested with limited strand indentation during cabling and good transport performance. In this paper, the first test results and analysis on the AC loss of Bi2212 round wires and cabled conductor samples are presented. Furthermore, the impact of mechanical load on the AC loss of the sub-size conductor is investigated to represent the operation conditions with electromagnetic loads. The first tests provide an essential basis for the validation of Bi2212 CICC and its application in fusion magnets.
Heat Treatment Optimization of Rutherford Cables for a 15 T Nb 3Sn Dipole Demonstrator
Barzi, Emanuela; Bossert, Marianne; Field, Michael; ...
2017-01-09
FNAL has been developing a 15 T Nb 3Sn dipole demonstrator for a future Very High Energy pp Collider based on an optimized 60-mm aperture 4-layer “cos-theta” coil. In order to increase magnet efficiency, we graded the coil by using two cables with same 15 mm width and different thicknesses made of two different Restacked Rod Process (RRP®) wires. Due to the non-uniform field distribution in dipole coils the maximum field in the inner coil will reach 15-16 T, whereas the maximum field in the outer coil is 12-13 T. In preparation for the 15 T dipole coil reaction, heatmore » treatment studies were performed on strands extracted from these cables with the goal of achieving the best coil performance in the corresponding magnetic fields. Particularly, the effect of maximum temperature and time on the cable critical current was studied to take into account actual variations of these parameters during coil reaction. In parallel and in collaboration with OST, development was performed on optimizing Nb 3Sn RRP® wire design and layout. Index Terms— Accelerator magnet, critical current density, Nb 3Sn strand, Rutherford cable.« less
Rapin, M; Ferrario, D; Haenni, E; Wacker, J; Falhi, A; Meier, C; Porchet, J-A; Chetelat, O
2017-07-01
Classical approaches to make high-quality measurements of biopotential signals require the use of shielded or multi-wire cables connecting the electrodes to a central unit in a star arrangement. Consequently, increasing the number of leads increases cabling and connector complexity which is not only limiting patient comfort but also anticipated as the main limiting factor for future miniaturization and cost reduction of tomorrow's wearables. We have recently introduced a novel sensing architecture that significantly reduces cabling complexity by eliminating shielded or multi-wire cables as well as by allowing simple connectors thanks to a bus arrangement. In this architecture, electrodes are replaced by so-called cooperative sensors. However, in this design, one of the cooperative sensors needs to be equipped with two contacts with the skin for proper common mode rejection, thus making its miniaturization problematic. This paper presents a novel common mode rejection principle which overcomes this limitation. When compared to others, the suggested approach is advantageous as it keeps the cabling complexity to its minimum. First measurements demonstrated in a real-life scenario the feasibility of this common mode rejection principle for a wearable 12-lead electrocardiogram monitoring system.
Feasibility study of a 270V dc flat cable aircraft electrical power distributed system
NASA Astrophysics Data System (ADS)
Musga, M. J.; Rinehart, R. J.
1982-01-01
This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.
Detection and characterization of corrosion of bridge cables by time domain reflectometry
NASA Astrophysics Data System (ADS)
Liu, Wei; Hunsperger, Robert G.; Folliard, Kevin; Chajes, Michael J.; Barot, Jignesh; Jhaveri, Darshan; Kunz, Eric
1999-02-01
In this paper, we develop and demonstrate a nondestructive evaluation technique for corrosion detection of embedded or encased steel cables. This technique utilizes time domain reflectometry (TDR), which has been traditionally used to detect electrical discontinuities in transmission lines. By applying a sensor wire along with the bridge cable, we can model the cable as an asymmetric, twin-conductor transmission line. Physical defects of the bridge cable will change the electromagnetic properties of the line and can be detected by TDR. Furthermore, different types of defects can be modeled analytically, and identified using TDR. TDR measurement results from several fabricated bridge cable sections with built-in defects are reported.
77 FR 51720 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-27
... clamps installed within the left environmental cooling systems (ECS) bay, which could allow wiring to... support clamps installed within the left ECS bay, which is a flammable leakage zone. Use of incorrect wire... bundle within the left side ECS bay, and corrective actions if necessary. Corrective actions include...
Bits in the Ether: Wireless LANS Leave Cables Behind.
ERIC Educational Resources Information Center
Bosak, Steve
2000-01-01
Due to wiring limitations, network access in schools is often limited to a computer lab and a couple of classroom terminals. By exchanging cables for 500-ft. wireless connections, a South Carolina district has been able to spread network and Internet access where and when it is needed. (MLH)
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2010 CFR
2010-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2011 CFR
2011-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2013 CFR
2013-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2014 CFR
2014-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2012 CFR
2012-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
ERIC Educational Resources Information Center
Pool, Ithiel de Sola; Alexander, Herbert E.
The implications for American politics, public affairs broadcasting, and new reporting under different sorts of cable television (CATV) systems are considered in detail by this report. The authors believe that a contract carrier system is the most desirable, since it makes broadcast time most freely available and prevents the cable franchise owner…
77 FR 13993 - Airworthiness Directives; Spectrolab Nightsun XP Searchlight
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
.../Gimbal could disconnect from the helicopter and remain attached solely by the internal cable harness or... from the helicopter and remaining attached soley by the internal cable harness, or separating totally... incorporates two positive locking mechanisms: a torque value and safety wire applied to the nut. These locking...
JPRS Report, Science & Technology, China.
1992-12-16
Optic Cable Ltd., with a gross investment of US$12.60 million; this firm will market the LXE bundle- tube lightweight fiber optic cable product...trap. There are four types of chemical generators commonly used to produce 02(’A): bubbler, atomizer, wet wall tube array and rotating disk. The...used in small COIL experiments. Figure 2 is a schematic diagram of the device. Chlorine gas passes through a bubbler (glass tube with many drilled
77 FR 2928 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... pressure hose and electrical wiring of the green electrical motor pump (EMP). This proposed AD would... for correct condition and installation of hydraulic pressure hoses, electrical conduits, feeder cables... detect and correct chafing of hydraulic pressure hoses and electrical wiring of the green EMPs, which in...
Manufacture and quality control of interconnecting wire harnesses
NASA Technical Reports Server (NTRS)
1973-01-01
Four-volume series of documents has been prepared as standard reference. Each volume may be used separately and covers wire and cable preparation as well as harness fabrication and installation. Series should be useful addition to libraries of manufactures of electrical and electronic equipment.
NASA Technical Reports Server (NTRS)
Koenig, Dieter
1994-01-01
Development of a new test method suitable for the assessment of the resistance of aerospace cables to arc tracking for different specific environmental and network conditions of spacecraft is given in view-graph format. The equipment can be easily adapted for tests at different realistic electrical network conditions incorporating circuit protection and the test system works equally well whatever the test atmosphere. Test results confirm that pure Kapton insulated wire has bad arcing characteristics and ETFE insulated wire is considerably better in air. For certain wires, arc tracking effects are increased at higher oxygen concentrations and significantly increased under vacuum. All tests on different cable insulation materials and in different environments, including enriched oxygen atmospheres, resulted in a more or less rapid extinguishing of all high temperature effects at the beginning of the post-test phase. In no case was a self-maintained fire initiated by the arc.
Investigation of current transfer in built-up superconductors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, J.R.; Dresner, L.; Lue, J.W.
1977-01-01
Superconductors carrying 10 kA or more have been widely suggested for use in fusion research and reactor magnets. Built-up or cable conductors have been proposed in which superconductor is concentrated in part of the conductor or part of the strands while the stabilizer occupies the rest. This scheme leads to substantial saving in manufacturing cost and to reduction of ac losses. Simplified analysis indicates that the current transfer from superconducting wire to normal wire takes place over a characteristic length depending on the resistivity of the contact barrier, the resistivity of the stabilizer, and the geometry of the conductor. Furthermore,more » the cold-end recovery suffers a reduction. Two types of conductors were constructed for the experimental test. Triplex conductors consisting of either three superconducting wires or two superconducting plus one copper wire were used to simulate cables. Laminated superconductor and copper strips with different soldering bonds were used for build-ups. Normal zone propagation and recovery experiments have been performed and results are compared with the theory.« less
Leaky coaxial cable signal transmission for remote facilities
NASA Astrophysics Data System (ADS)
Smith, S. F.; Crutcher, R. I.
To develop reliable communications methods to meet the rigorous requirements for nuclear hot cells and similar environments, including control of cranes, transporters, and advanced servomanipulators, the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has conducted extensive tests of numerous technologies to determine their applicability to remote operations. To alleviate the need for large bundles of cables that must accommodate crane/transporter motion relative to the boundaries of the cell, several transmission techniques are available, including slotted-line radio-frequency couplers, infrared beams, fiber-optic cables, free-space microwave, and inductively coupled leaky coaxial cable. This paper discusses the general characteristics, mode of operation, and proposed implementation of leaky coaxial cable technology in a waste-handling facility scheduled to be built in the near future at ORNL. In addition, specific system hardware based around the use of leaky coaxial cable is described in detail. Finally, data from a series of radiation exposure tests conducted by the CFRP on several samples of the basic leaky coaxial cable and associated connectors are presented.
NASA Astrophysics Data System (ADS)
Rammage, Robert L.
1990-10-01
A device for sequentially testing the plurality of connectors in a wiring harness is disclosed. The harness is attached to the tester by means of adapter cables and a rotary switch is used to sequentially, individually test the connectors by passing a current through the connector. If the connector is unbroken, a light will flash to show it is electrically sound. The adapters allow a large number of cable configurations to be tested using a single tester configuration.
Universal fiber-optic C.I.E. colorimeter
Kronberg, James W.
1992-01-01
Apparatus for color measurements according to the C.I.E. system comprises a first fiber optic cable for receiving and linearizing light from a light source, a lens system for spectrally displaying the linearized light and focusing the light on one end of a trifurcated fiber optic assembly that integrates and separates the light according to the three C.I.E. tristimulus functions. The separated light is received by three photodiodes and electronically evaluated to determine the magnitude of the light corresponding to the tristimulus functions. The fiber optic assembly is made by forming, at one end, a bundle of optic fibers to match the contours of one of the tristimulus functions, encapsulating that bundle, adding a second bundle that, together with the first bundle, will match the contours of the first plus one other tristimulus function, encapsulating that second bundle, then adding a third bundle which together with the first and second bundles, has contours matching the sum of all three tristimulus functions. At the other end of the assembly the three bundles are separated and aligned with their respective photodiodes.
NASA requirements and applications environments for electrical power wiring
NASA Technical Reports Server (NTRS)
Stavnes, Mark W.; Hammoud, Ahmad N.
1992-01-01
Serious problems can occur from insulation failures in the wiring harnesses of aerospace vehicles. In most recorded incidents, the failures have been identified to be the result of arc tracking, the propagation of an arc along wiring bundles through degradation of insulation. Propagation of the arc can lead to the loss of the entire wiring harness and the functions which it supports. While an extensive database of testing for arc track resistant wire insulations has been developed for aircraft applications, the counterpart requirements for spacecraft are very limited. The electrical, thermal, mechanical, chemical, and operational requirements for specification and testing of candidate wiring systems for spacecraft applications is presented.
Allais, Arnaud [Hannover, DE; Schmidt, Frank [Langenhagen, DE
2009-12-15
A superconductor cable includes a superconductive cable core (1) and a cryostat (2) enclosing the same. The cable core (1) has a superconductive conductor (3), an insulation (4) surrounding the same and a shielding (5) surrounding the insulation (4). A layer (3b) of a dielectric or semiconducting material is applied to a central element (3a) formed from a normally conducting material as a strand or tube and a layer (3c) of at least one wire or strip of superconductive material is placed helically on top. The central element (3a) and the layer (3c) are connected to each other in an electrically conducting manner at the ends of the cable core (1).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Serell, D.C.; Kaplan, S.
1980-09-01
Purpose of this evaluation is to estimate the magnitude and effects of irradiation and creep induced fuel bundle deformations in the developmental plant. This report focuses on the trends of the results and the ability of present models to evaluate the assembly temperatures in the presence of bundle deformation. Although this analysis focuses on the developmental plant, the conclusions are applicable to LMFBR fuel assemblies in general if they have wire spacers.
"Fly-by-Wireless" and Wireless Sensors Update
NASA Technical Reports Server (NTRS)
Studor, George F.
2009-01-01
This slide presentation reviews the uses of wires in the Aerospace industry. The vision is to minimize cables and connectors and increase functionality across the aerospace industry by providing reliable lower cost modular and higher performance alternatives to wired data connectivity to benefit the entire vehicle and program
Filter line wiring designs in aircraft
NASA Astrophysics Data System (ADS)
Rowe, Richard M.
1990-10-01
The paper presents a harness design using a filter-line wire technology and appropriate termination methods to help meet high-energy radiated electromagnetic field (HERF) requirements for protection against the adverse effects of EMI on electrical and avionic systems. Filter-line interconnect harnessing systems discussed consist of high-performance wires and cables; when properly wired they suppress conducted and radiated EMI above 100 MHz. Filter-line termination devices include backshell adapters, braid splicers, and shield terminators providing 360-degree low-impedance terminations and enhancing maintainability of the system.
Soliman, Elsayed Z
2008-01-01
The similarity between and the number of limb lead cables play an important role in the frequency of incorrect connection of limb electrodes. Hence, a modified electrocardiogram (ECG) acquisition procedure is proposed in this brief communication, whereby the left-leg (LL) and right-leg (RL) electrode cables are combined into 1 cable, referred to as combined LL/RL cable. The electrode wires in the combined LL/RL cable are connected to 2 electrodes placed on both sides of the LL. The combined LL/RL cable is unique enough (being thicker) not to be mistaken with the upper limb electrode cables. The proposed modification will not in any way influence the ECG waveforms or amplitudes, and it can be expected to substantially reduce incorrect limb electrode placements.
Material Selection for Cable Gland to Improved Reliability of the High-hazard Industries
NASA Astrophysics Data System (ADS)
Vashchuk, S. P.; Slobodyan, S. M.; Deeva, V. S.; Vashchuk, D. S.
2018-01-01
The sealed cable glands (SCG) are available to ensure safest connection sheathed single wire for the hazard production facility (nuclear power plant and others) the same as pilot cable, control cables, radio-frequency cables et al. In this paper, we investigate the specifics of the material selection of SCG with the express aim of hazardous man-made facility. We discuss the safe working conditions for cable glands. The research indicates the sintering powdered metals cables provide the reliability growth due to their properties. A number of studies have demonstrated the verification of material selection. On the face of it, we make findings indicating that double glazed sealed units could enhance reliability. We had evaluated sample reliability under fire conditions, seismic load, and pressure containment failure. We used the samples mineral insulated thermocouple cable.
NASA Astrophysics Data System (ADS)
Lim, E. K.; Norizan, M. N.; Mohamad, I. S.; Yasin, M. N. M.; Murad, S. A. Z.; Baharum, N. A.; Jamalullail, N.
2017-09-01
This paper presents the design of anti-theft/cable cut real time alert system using microcontroller and GSM technology. The detection part is using the electrical circuit wire connection in detecting the voltage drop of the cable inside the microcontroller digital input port. The GSM wireless modem is used to send the location of cable cut directly to the authority mobile phone. Microcontroller SK40C with Microchip PIC16F887 is used as a controller to control the wireless modem and also the detection device. The device is able to detect and display the location of the cable cut on the LCD display besides of and sending out the location of the cable break to the authority mobile phone wirelessly via SMS.
Applications of FRP-OFBG sensors on bridge cables
NASA Astrophysics Data System (ADS)
Zhou, Zhi; Zhang, Zhichun; Deng, Nianchun; Zhao, Xuefeng; Li, Dongsheng; Wang, Chuang; Ou, Jinping
2005-05-01
It is still a practical problem how to effectively install FBG sensors on bridge cabes. In this paper, a simple and effective solution is introduced to develop smart bridge cables using FRP-OFBG bars developed in HIT (Harbin Institute of Technology). Here, the FRP-OFBG bar acts as one component of the cable and shows force resistance and well-protected sensors in service. The installation techniques and the sensing properties of FBGs in three kinds of cables, FRP cables, common steel-wire cable and extruded-anchor cable, are introduced and tested under dead load. Moreover, the preliminary introduction of a practical field application based on this solution has been also given. The experimental results show that the deformability of FRP-OFBG bars in the smart cables can reach the terminal and show wonderful accuracy, which shows that such kind of smart cable is practical in field application.
Vandre, R H; Klebers, J; Tesche, F M; Blanchard, J P
1993-05-01
Part I of this paper showed that a field commander can expect approximately 65% of his unprotected electronic medical equipment to be damaged by the electromagnetic pulse (EMP) from a single nuclear detonation as far as 2200 km away. Using computer modeling, field-expedient ways to minimize the effects of EMP were studied. The results were: (1) keep wiring near the ground, (2) keep wiring short, (3) unplug unused equipment, (4) run power cabling and tents in a magnetic north-south direction (avoid running power cabling in the east-west direction), and (5) place sensitive equipment in International Organization for Standardization shelters.
Technology for Transportation Safety
NASA Technical Reports Server (NTRS)
1981-01-01
Boston Insulated Wire & Cable developed a new polyimide foam material, commercially known as Solimide, which resists ignition. It chars and decomposes when exposed to open flames. Used in the space shuttle, the material does not "outgas" until it begins to char making it safer than current materials with respect to toxic fumes. The polyimide can be made in two forms: a resilient foam and a rigid foam. Used in commercial transport interiors for such soft components as seat cushions to door, wall, floor, and ceiling panels. Material's flame resistance could lengthen from two minutes to five minutes, the time needed for passenger evacuation in a ground emergency. Could help reduce airline fuel consumption, since the foam is 50% lighter than current materials. Low-smoke cable assemblies used in rapid transit systems consists of an advanced wire and cable jacketing material with superior flame resistance and smoke retardation characteristics. Being supplied to mass transit systems in the U.S. and abroad.