Counter-balanced, multiple cable construction crane
NASA Astrophysics Data System (ADS)
Mikulas, Martin M., Jr.; Yang, Li-Farn
1991-11-01
The invention is a counter-balanced, multiple cable construction crane. The apparatus for hoisting payloads comprises a crane having a lifting means, the lifting means comprising an end effector means and three suspension means or cables. One end of each cable attaches to a different winding means located on the lifting means, and the other end of each cable attaches to a different point on the end effector, such that the three cables have a theoretical point of convergence with this point corresponding to the center of mass of the payload. Three controls command rotation of the winding means to a predetermined position. Accordingly, the crane provides precise and autonomous positioning of the payload without human guidance. The crane further comprises a counter-balancing means. Two controls position the counter-balancing means to offset the overturning moment which arises during the lifting of heavy payloads.
Counter-balanced, multiple cable construction crane
NASA Astrophysics Data System (ADS)
Mikulas, Martin M., Jr.; Yang, Li-Farn
1993-10-01
The invention is a counter-balanced, multiple cable construction crane. The apparatus for hoisting payloads comprises a crane having a lifting means, the lifting means comprising an end effector means and three suspension means or cables. One end of each cable attaches to a different winding means located on the lifting means, and the other end of each cable attaches to a different point on the end effector, such that the three cables have a theoretical point of convergence with this point corresponding to the center of mass of the payload. Three controls command rotation of the winding means to a predetermined position. Accordingly, the crane provides precise and autonomous positioning of the payload without human guidance. The crane further comprises a counter-balancing means. Two controls position the counter-balancing means to offset the overturning moment which arises during the lifting of heavy payloads.
Counter-balanced, multiple cable construction crane
NASA Technical Reports Server (NTRS)
Mikulas, Martin M., Jr. (Inventor); Yang, Li-Farn (Inventor)
1993-01-01
The invention is a counter-balanced, multiple cable construction crane. The apparatus for hoisting payloads comprises a crane having a lifting means, the lifting means comprising an end effector means and three suspension means or cables. One end of each cable attaches to a different winding means located on the lifting means, and the other end of each cable attaches to a different point on the end effector, such that the three cables have a theoretical point of convergence with this point corresponding to the center of mass of the payload. Three controls command rotation of the winding means to a predetermined position. Accordingly, the crane provides precise and autonomous positioning of the payload without human guidance. The crane further comprises a counter-balancing means. Two controls position the counter-balancing means to offset the overturning moment which arises during the lifting of heavy payloads.
Conceptual design of a multiple cable crane for planetary surface operations
NASA Technical Reports Server (NTRS)
Mikulas, Martin M., Jr.; Yang, Li-Farn
1991-01-01
A preliminary design study is presented of a mobile crane suitable for conducting remote, automated construction operations on planetary surfaces. A cursory study was made of earth based mobile cranes and the needs for major improvements were identified. Current earth based cranes have a single cable supporting the payload, and precision positioning is accomplished by the use of construction workers controlling the payload by the use of tethers. For remote, autonomous operations on planetary surfaces it will be necessary to perform the precision operations without the use of humans. To accomplish this the payload must be stabilized relative to the crane. One approach for accomplishing this is to suspend the payload on multiple cable. A 3-cable suspension system crane concept is discussed. An analysis of the natural frequency of the system is presented which verifies the legitimacy of the concept.
Lunar surface structural concepts and construction studies
NASA Technical Reports Server (NTRS)
Mikulas, Martin
1991-01-01
The topics are presented in viewgraph form and include the following: lunar surface structures construction research areas; lunar crane related disciplines; shortcomings of typical mobile crane in lunar base applications; candidate crane cable suspension systems; NIST six-cable suspension crane; numerical example of natural frequency; the incorporation of two new features for improved performance of the counter-balanced actively-controlled lunar crane; lunar crane pendulum mechanics; simulation results; 1/6 scale lunar crane testbed using GE robot for global manipulation; basic deployable truss approaches; bi-pantograph elevator platform; comparison of elevator platforms; perspective of bi-pantograph beam; bi-pantograph synchronously deployable tower/beam; lunar module off-loading concept; module off-loader concept packaged; starburst deployable precision reflector; 3-ring reflector deployment scheme; cross-section of packaged starburst reflector; and focal point and thickness packaging considerations.
A two cable, six link boom crane for lunar construction
NASA Technical Reports Server (NTRS)
Taylor, Robert M.; Mikulas, Martin M., Jr.; Hedgepeth, John M.
1993-01-01
This paper presents the conceptual design and analysis of a modified crane boom and cable suspension which provide contro1 over all six degrees of freedom of a payload. Two cables pass around pulleys to form six links between the payload and boom. A linearization of the pulley mechanics was derived to create finite element models of the system. The models were experimentally verified and used to explore variations of the suspension geometry. Several crane concepts which use the suspension are discussed and illustrated.
Mechanism synthesis and 2-D control designs of an active three cable crane
NASA Technical Reports Server (NTRS)
Yang, Li-Farn; Mikulas, Martin M., Jr.
1992-01-01
A Lunar Crane with a suspension system based on a three cable mechanism is investigated to provide a stable end-effector for hoisting, positioning, and assembling large components during construction and servicing of a Lunar Base. The three cable suspension mechanism consists of a structural framework of three cables pointing to a common point that closely coincides with the suspended payload's center of gravity. The vibrational characteristics of this three cable suspension system are investigated by comparing a simple 2-D symmetric suspension model and a swinging pendulum in terms of their analytical natural frequency equations. A study is also made of actively controlling the dynamics of the crane using two different actuator concepts. Also, Lyapunov-based control algorithms are developed to determine two regulator-type control laws performing the system vibrational suppression for both system dynamics. Simulations including initial-valued dynamic responses as well as control performances for two different system dynamics are also presented.
Proposed technique for vertical alignment of a crane's cable
NASA Technical Reports Server (NTRS)
Gera, J., Jr.
1969-01-01
Proposed vertical alignment technique senses the attitude of a cranes cable and displays any deviation from the vertical. The system consists of a detector assembly fixed to the boom and a display scope located in the cabin. It has potential application with either fixed-boom cranes or gantries.
NASA Technical Reports Server (NTRS)
Harris, Elizabeth; Ogle, James; Schoppe, Dean
1989-01-01
The lifting machine will assist in lifting cargo off of landers sent to the Moon and in the construction of a lunar base. Three possible designs were considered for the overall configuration of the lifting machine: the variable angle crane, the tower crane, and the gantry crane. Alternate designs were developed for the major components of the lifting machine. A teleoperable, variable angle crane was chosen as its final design. The design consists of a telescoping boom mounted to a chassis that is supported by two conical wheels for towing and four outriggers for stability. Attached to the end of the boom is a seven degree of freedom robot arm for light, dexterous, lifting operations. A cable and hook suspends from the end of the boom for heavy, gross, lifting operations. Approximate structural sizes were determined for the lifter and its components. However, further analysis is needed to determine the optimum design dimensions. The design team also constructed a model of the design which demonstrates its features and operating principals.
Goertz, R.C.
1957-09-17
A device that reduces or eliminntes the swing of an object being transported by a traveling crane is described. The supporting cable of the crane extends through a guide and follower positioned below the crane by an electric motor and follow-up circuit. The swing or horizontal motion of the cable is detected by the follower, and a signal is generated that will cause the motor to move the follower in opposition to the motion of the swing thus having a dampening effect on the pendulum action of the supported body. This improvement is particularly valuable when the supported load may be so radioactive that a person could not manually stop the swing.
PBF Reactor Building (PER620) under construction. Aerial view with camera ...
PBF Reactor Building (PER-620) under construction. Aerial view with camera facing northeast. Steel framework is exposed for west wing and high bay. Concrete block siding on east wing. Railroad crane set up on west side. Note trenches proceeding from front of building. Left trench is for secondary coolant and will lead to Cooling Tower. Shorter trench will contain cables leading to control area. Photographer: Larry Page. Date: March 22, 1967. INEEL negative no. 67-5025 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Leaky coaxial cable signal transmission for remote facilities
NASA Astrophysics Data System (ADS)
Smith, S. F.; Crutcher, R. I.
To develop reliable communications methods to meet the rigorous requirements for nuclear hot cells and similar environments, including control of cranes, transporters, and advanced servomanipulators, the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has conducted extensive tests of numerous technologies to determine their applicability to remote operations. To alleviate the need for large bundles of cables that must accommodate crane/transporter motion relative to the boundaries of the cell, several transmission techniques are available, including slotted-line radio-frequency couplers, infrared beams, fiber-optic cables, free-space microwave, and inductively coupled leaky coaxial cable. This paper discusses the general characteristics, mode of operation, and proposed implementation of leaky coaxial cable technology in a waste-handling facility scheduled to be built in the near future at ORNL. In addition, specific system hardware based around the use of leaky coaxial cable is described in detail. Finally, data from a series of radiation exposure tests conducted by the CFRP on several samples of the basic leaky coaxial cable and associated connectors are presented.
Lunar surface vehicle model competition
NASA Technical Reports Server (NTRS)
1990-01-01
During Fall and Winter quarters, Georgia Tech's School of Mechanical Engineering students designed machines and devices related to Lunar Base construction tasks. These include joint projects with Textile Engineering students. Topics studied included lunar environment simulator via drop tower technology, lunar rated fasteners, lunar habitat shelter, design of a lunar surface trenching machine, lunar support system, lunar worksite illumination (daytime), lunar regolith bagging system, sunlight diffusing tent for lunar worksite, service apparatus for lunar launch vehicles, lunar communication/power cables and teleoperated deployment machine, lunar regolith bag collection and emplacement device, soil stabilization mat for lunar launch/landing site, lunar rated fastening systems for robotic implementation, lunar surface cable/conduit and automated deployment system, lunar regolith bagging system, and lunar rated fasteners and fastening systems. A special topics team of five Spring quarter students designed and constructed a remotely controlled crane implement for the SKITTER model.
Dynamics and control of cable-suspended parallel robots for giant telescopes
NASA Astrophysics Data System (ADS)
Zhuang, Peng; Yao, Zhengqiu
2006-06-01
A cable-suspended parallel robot utilizes the basic idea of Stewart platform but replaces parallel links with cables and linear actuators with winches. It has many advantages over a conventional crane. The concept of applying a cable-suspended parallel robot into the construction and maintenance of giant telescope is presented in this paper. Compared with the mass and travel of the moving platform of the robot, the mass and deformation of the cables can be disregarded. Based on the premises, the kinematic and dynamic models of the robot are built. Through simulation, the inertia and gravity of moving platform are found to have dominant effect on the dynamic characteristic of the robot, while the dynamics of actuators can be disregarded, so a simplified dynamic model applicable to real-time control is obtained. Moreover, according to control-law partitioning approach and optimization theory, a workspace model-based controller is proposed considering the characteristic that the cables can only pull but not push. The simulation results indicate that the controller possesses good accuracy in pose and speed tracking, and keeps the cables in reliable tension by maintaining the minimum strain above a certain given value, thus ensures smooth motion and accurate localization for moving platform.
ETR BUILDING, TRA642, INTERIOR. FIRST FLOOR. REACTOR IS IN CENTER ...
ETR BUILDING, TRA-642, INTERIOR. FIRST FLOOR. REACTOR IS IN CENTER OF VIEW. CAMERA FACES NORTHWEST. NOTE CRANE RAILS AND DANGLING ELECTRICAL CABLE AT UPPER PART OF VIEW FOR "MOFFETT 2 TON" CRANE. INL NEGATIVE NO. HD46-14-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Operator control systems and methods for swing-free gantry-style cranes
Feddema, J.T.; Petterson, B.J.; Robinett, R.D. III
1998-07-28
A system and method are disclosed for eliminating swing motions in gantry-style cranes while subject to operator control. The present invention comprises an infinite impulse response (IIR) filter and a proportional-integral (PI) feedback controller. The IIR filter receives input signals (commanded velocity or acceleration) from an operator input device and transforms them into output signals in such a fashion that the resulting motion is swing free (i.e., end-point swinging prevented). The parameters of the IIR filter are updated in real time using measurements from a hoist cable length encoder. The PI feedback controller compensates for modeling errors and external disturbances, such as wind or perturbations caused by collision with objects. The PI feedback controller operates on cable swing angle measurements provided by a cable angle sensor. The present invention adjusts acceleration and deceleration to eliminate oscillations. An especially important feature of the present invention is that it compensates for variable-length cable motions from multiple cables attached to a suspended payload. 10 figs.
Operator control systems and methods for swing-free gantry-style cranes
Feddema, John T.; Petterson, Ben J.; Robinett, III, Rush D.
1998-01-01
A system and method for eliminating swing motions in gantry-style cranes while subject to operator control is presented. The present invention comprises an infinite impulse response ("IIR") filter and a proportional-integral ("PI") feedback controller (50). The IIR filter receives input signals (46) (commanded velocity or acceleration) from an operator input device (45) and transforms them into output signals (47) in such a fashion that the resulting motion is swing free (i.e., end-point swinging prevented). The parameters of the IIR filter are updated in real time using measurements from a hoist cable length encoder (25). The PI feedback controller compensates for modeling errors and external disturbances, such as wind or perturbations caused by collision with objects. The PI feedback controller operates on cable swing angle measurements provided by a cable angle sensor (27). The present invention adjusts acceleration and deceleration to eliminate oscillations. An especially important feature of the present invention is that it compensates for variable-length cable motions from multiple cables attached to a suspended payload.
The NIST SPIDER, A Robot Crane
Albus, James; Bostelman, Roger; Dagalakis, Nicholas
1992-01-01
The Robot Systems Division of the National Institute of Standards and Technology has been experimenting for several years with new concepts for robot cranes. These concepts utilize the basic idea of the Stewart Platform parallel link manipulator. The unique feature of the NIST approach is to use cables as the parallel links and to use winches as the actuators. So long as the cables are all in tension, the load is kinematically constrained, and the cables resist perturbing forces and moments with equal stiffness to both positive and negative loads. The result is that the suspended load is constrained with a mechanical stiffness determined by the elasticity of the cables, the suspended weight, and the geometry of the mechanism. Based on these concepts, a revolutionary new type of robot crane, the NIST SPIDER (Stewart Platform Instrumented Drive Environmental Robot) has been developed that can control the position, velocity, and force of tools and heavy machinery in all six degrees of freedom (x, y, z, roll, pitch, and yaw). Depending on what is suspended from its work platform, the SPIDER can perform a variety of tasks. Examples are: cutting, excavating and grading, shaping and finishing, lifting and positioning. A 6 m version of the SPIDER has been built and critical performance characteristics analyzed. PMID:28053439
The NIST SPIDER, A Robot Crane.
Albus, James; Bostelman, Roger; Dagalakis, Nicholas
1992-01-01
The Robot Systems Division of the National Institute of Standards and Technology has been experimenting for several years with new concepts for robot cranes. These concepts utilize the basic idea of the Stewart Platform parallel link manipulator. The unique feature of the NIST approach is to use cables as the parallel links and to use winches as the actuators. So long as the cables are all in tension, the load is kinematically constrained, and the cables resist perturbing forces and moments with equal stiffness to both positive and negative loads. The result is that the suspended load is constrained with a mechanical stiffness determined by the elasticity of the cables, the suspended weight, and the geometry of the mechanism. Based on these concepts, a revolutionary new type of robot crane, the NIST SPIDER (Stewart Platform Instrumented Drive Environmental Robot) has been developed that can control the position, velocity, and force of tools and heavy machinery in all six degrees of freedom ( x, y, z , roll, pitch, and yaw). Depending on what is suspended from its work platform, the SPIDER can perform a variety of tasks. Examples are: cutting, excavating and grading, shaping and finishing, lifting and positioning. A 6 m version of the SPIDER has been built and critical performance characteristics analyzed.
ETR BUILDING, TRA642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. ...
ETR BUILDING, TRA-642, INTERIOR. CONSOLE FLOOR, SOUTH HALF. CABLE TUNNEL. CAMERA FACING SOUTH INTO ETR ELECTRICAL BUILDING (TRA-648). INL NEGATIVE NO. HD46-20-2. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... cranes rule, OSHA prepared a final economic analysis (FEA) as required by the Occupational Safety and... construction work involving demolition. The FEA for the final cranes standard, which included all cranes, crane... were technologically and economically feasible. Because the FEA drew these conclusions from...
77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... Analysis When it issued the final cranes rule, OSHA prepared a final economic analysis (FEA) as required by... construction and cranes engaged in construction work involving demolition. The FEA for the final cranes..., found that the requirements of the rule were technologically and economically feasible. Because the FEA...
78 FR 8985 - Cranes and Derricks in Construction: Revising the Exemption for Digger Derricks
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
.... OSHA-2012-0025] RIN 1218-AC75 Cranes and Derricks in Construction: Revising the Exemption for Digger... November 9, 2012, to broaden the exemption for digger derricks in its construction standard for cranes and... broaden the exemption for digger derricks in its construction standard for cranes and derricks. In those...
AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report
2015-01-29
Crane FAT at Sherwood, OR iii. Design Review at Anacortes 2. The following Shipyard Question Submittals were reviewed and commented on: No...two 100-kw chill water heaters for HVAC winter operation. New for this reporting period – DCI is installing the hardware (cables and shut trips) to...the two 100-kw HVAC heaters and the galley equipment breakers. • Main Crane Towing & Coring Crutch – The crutch assembly being provided by Allied
A Mixed Model for Real-Time, Interactive Simulation of a Cable Passing Through Several Pulleys
NASA Astrophysics Data System (ADS)
García-Fernández, Ignacio; Pla-Castells, Marta; Martínez-Durá, Rafael J.
2007-09-01
A model of a cable and pulleys is presented that can be used in Real Time Computer Graphics applications. The model is formulated by the coupling of a damped spring and a variable coefficient wave equation, and can be integrated in more complex mechanical models of lift systems, such as cranes, elevators, etc. with a high degree of interactivity.
75 FR 68429 - Cranes and Derricks in Construction; Approval of Information Collection Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
.... OSHA-2007-0066] RIN 1218-AC01 Cranes and Derricks in Construction; Approval of Information Collection... requirements. SUMMARY: On August 9, 2010, OSHA published a final rule revising the Cranes and Derricks Standard... necessary to protect employees during the use of cranes and derricks in construction. That final standard...
29 CFR 1926.1438 - Overhead & gantry cranes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1438 Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910...
NASA Technical Reports Server (NTRS)
Cash, John Wilson, III; Cone, Alan E.; Garolera, Frank J.; German, David; Lindabury, David Peter; Luckado, Marshall Cleveland; Murphey, Craig; Rowell, John Bryan; Wilkinson, Brad
1988-01-01
The base and ball hook system is an attachment that is designed to be used on the lunar surface as an improved alternative to the common crane hook and eye system. The design proposed uses an omni-directional ball hook and base to overcome the design problems associated with a conventional crane hook. The base and ball hook is not sensitive to cable twist which would render a robotic lunar crane useless since there is little atmospheric resistance to dampen the motion of an oscillating member. The symmetric characteristics of the ball hook and base eliminates manual placement of the ball hook into the base; commonly associated with the typical hook and eye stem. The major advantage of the base and ball hook system is it's ease of couple and uncouple modes that are advantages during unmanned robotic lunar missions.
29 CFR 1926.1441 - Equipment with a rated hoisting/lifting capacity of 2,000 pounds or less.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CONSTRUCTION Cranes and Derricks in Construction § 1926.1441 Equipment with a rated hoisting/lifting capacity... crane/derrick lifts—supplemental requirements); § 1926.1434 (Equipment modifications); § 1926.1435 (Tower cranes); § 1926.1436 (Derricks); § 1926.1437 (Floating cranes/derricks and land cranes/derricks on...
Fatal injuries in the United States construction industry involving cranes 1984-1994.
Suruda, A; Liu, D; Egger, M; Lillquist, D
1999-12-01
There is little published information concerning the epidemiology of injuries in the construction industry involving cranes other than for electrical injury from power line contact. For the 11-year period of 1984 through 1994, the US Occupational Safety and Health Administration (OSHA) investigated 502 deaths in 479 incidents involving cranes in the construction industry. Electrocution was the largest category, with 198 deaths (39%) reported. Other major categories were assembly/dismantling (58 deaths, 12%), boom buckling (41 deaths, 8%), crane upset/overturn (37 deaths, 7%), and rigging failure (36 deaths, 7%). The majority of the deaths during assembly/dismantling involved removal of the boom pins from lattice boom cranes. Only 34% of the construction firms employing the fatally injured workers had ever been inspected by OSHA. OSHA cited the employer for safety violations in 436 deaths (83%). Additional worker training, increased OSHA inspections, and crane inspection programs could prevent many crane-related deaths.
Robotic Joints Support Horses and Humans
NASA Technical Reports Server (NTRS)
2008-01-01
A rehabilitative device first featured in Spinoff 2003 is not only helping human patients regain the ability to walk, but is now helping our four-legged friends as well. The late James Kerley, a prominent Goddard Space Flight Center researcher, developed cable-compliant mechanisms in the 1980s to enable sounding rocket assemblies and robots to grip or join objects. In cable-compliant joints (CCJs), short segments of cable connect structural elements, allowing for six directions of movement, twisting, alignment, and energy damping. Kerley later worked with Goddard s Wayne Eklund and Allen Crane to incorporate the cable-compliant mechanisms into a walker for human patients to support the pelvis and imitate hip joint movement.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1417 Operation...) Swinging locomotive cranes. A locomotive crane must not be swung into a position where railway cars on an... applies to equipment other than tower cranes: (i) Equipment must not be operated without the counterweight...
29 CFR 1926.1440 - Sideboom cranes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Sideboom cranes. 1926.1440 Section 1926.1440 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1440 Sideboom cranes. (a) The provisions of this standard apply, except § 1926.1402 (Ground conditions), § 1926...
Pearse, Aaron T.; Brandt, David; Krapu, Gary
2016-01-01
Numerous wind energy projects have been constructed in the central and southern Great Plains, USA, the main wintering area for midcontinental Sandhill Cranes (Grus canadensis). In an initial assessment of the potential risks of wind towers to cranes, we estimated spatial overlap, investigated potential avoidance behavior, and determined the habitat associations of cranes. We used data from cranes marked with platform transmitting terminals (PTTs) with and without global positioning system (GPS) capabilities. We estimated the wintering distributions of PTT-marked cranes prior to the construction of wind towers, which we compared with current tower locations. Based on this analysis, we found 7% spatial overlap between the distributions of cranes and towers. When we looked at individually marked cranes, we found that 52% would have occurred within 10 km of a tower at some point during winter. Using data from cranes marked after tower construction, we found a potential indication of avoidance behavior, whereby GPS-marked cranes generally used areas slightly more distant from existing wind towers than would be expected by chance. Results from a habitat selection model suggested that distances between crane locations and towers may have been driven more by habitat selection than by avoidance, as most wind towers were constructed in locations not often selected by wintering cranes. Our findings of modest regional overlap and that few towers have been placed in preferred crane habitat suggest that the current distribution of wind towers may be of low risk to the continued persistence of wintering midcontinental Sandhill Cranes in the central and southern Great Plains.
Spherical Pendulum Small Oscillations for Slewing Crane Motion
Perig, Alexander V.; Stadnik, Alexander N.; Deriglazov, Alexander I.
2014-01-01
The present paper focuses on the Lagrange mechanics-based description of small oscillations of a spherical pendulum with a uniformly rotating suspension center. The analytical solution of the natural frequencies' problem has been derived for the case of uniform rotation of a crane boom. The payload paths have been found in the inertial reference frame fixed on earth and in the noninertial reference frame, which is connected with the rotating crane boom. The numerical amplitude-frequency characteristics of the relative payload motion have been found. The mechanical interpretation of the terms in Lagrange equations has been outlined. The analytical expression and numerical estimation for cable tension force have been proposed. The numerical computational results, which correlate very accurately with the experimental observations, have been shown. PMID:24526891
29 CFR 1926.1415 - Safety devices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1415... this subpart, unless otherwise specified: (1) Crane level indicator. (i) The equipment must have a crane level indicator that is either built into the equipment or is available on the equipment. (ii) If...
29 CFR 1926.1416 - Operational aids.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1416...)(2), and (e)(3) of this section do not apply to articulating cranes. (2) The requirements in... paragraphs (d) and (e) of this section. More protective alternative measures specified by the crane/derrick...
Peláez, Gerardo; Vaugan, Joshua; Izquierdo, Pablo; Rubio, Higinio; García-Prada, Juan Carlos
2018-06-04
Input shaping is an Optimal Control feedforward strategy whose ability to define how and when a flexible dynamical system defined by Ordinary Differential Equations (ODEs) and computer controlled would move into its operative space, without command induced unwanted dynamics, has been exhaustively demonstrated. This work examines the issue of Embedded Internet of Things (IoT) Input Shaping with regard to real time control of multibody oscillatory systems whose dynamics are better described by differential algebraic equations (DAEs). An overhead crane hanging a double link multibody payload has been appointed as a benchmark case; it is a multibody, multimode system. This might be worst scenario to implement Input Shaping. The reasons can be found in the wide array of constraints that arise. Firstly, the reliability of the multibody model was tested on a Functional Mock-Up Interface (FMI) with the two link payload suspended from the trolley by comparing the experimental video tapping signals in time domain faced with the signals extracted from the multibody model. The FFTs of the simulated and the experimental signal contain the same frequency harmonics only with somewhat different power due to the real world light damping in the joints. The application of this approach may be extended to other cases i.e., the usefulness of mobile hydraulic cranes is limited because the payload is supported by an overhead cable under tension that allows oscillation to occur during crane motion. If the payload size is not negligible small when compared with the cable length may introduce an additional oscillatory mode that creates a multibody double pendulum. To give the insight into the double pendulum dynamics by Lagrangian methods two slender rods as payloads are analyzed dealing with the overhead crane and a composite revolute-revolute joint is proposed to model the cable of the hydraulic crane, both assumptions facilitates an affordable analysis. This allows developing a general study of this type of multibody payloads dynamics including its normal modes, modes ratios plus ranges of frequencies expected. Input Shapers were calculated for those multimodes of vibration by convolving Specified Insensitivity (SI) shapers for each mode plus a novel Direct SI-SI shaper well suited to reduce the computational requirements, i.e., the number of the shaper taps, to carry out the convolution sum in real time by the IoT device based on a single microcontroller working as the command generator. Several comparisons are presented for the shaped and unshaped responses using both the multibody model, the experimental FMI set-up and finally a real world hydraulic crane under slewing motion commanded by an analog Joystick connected by two RF modules 802.15.4 to the IoT device that carry out the convolution sum in real time. Input Shaping improves the performances for all the cases.
A space crane concept for performing on-orbit assembly
NASA Technical Reports Server (NTRS)
Dorsey, John T.
1992-01-01
The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.
NASA Technical Reports Server (NTRS)
Mikulas, Martin M., Jr.
1991-01-01
In many lunar construction scenarios, mechanical cranes in some form will be indispensible in moving large masses around with various degrees of fine positioning. While thorough experience exists in the use of terrestrial cranes new thinking is required about the design of cranes to be used in extraterrestrial construction. The primary driving force for this new thinking is the need to automate the crane system so that space cranes can be operated as telerobotic machines with a large number of automatic capabilities. This is true because in extraterrestrial construction human resources will need to be critically rationed. The design problems of mechanisms and control systems for a lunar crane must deal with at least two areas of performance. First, the automated crane must be capable of maneuvering a large mass, so that when the mass arrives at the target position there are only small vibrations. Secondly, any residue vibrations must be automatically damped out and a fine positioning must be achieved. For extraterrestrial use there are additional challenges to a crane design - for example, to design a crane system so that it can be transformed for other construction uses. This initial project in crane design does not address such additional issues, although they may be the subject of future CSC research. To date the Center has designed and analyzed many mechanisms. The fundamental problem of trade-offs between passively stabilizing the load and actively controlling the load by actuators was extensively studied. The capability of 3D dynamics modeling now exists for such studies. A scaled model of a lunar crane was set up and it has been most fruitful in providing basic understanding of lunar cranes. Due to an interesting scaling match-up, this scaled model exhibits the load vibration frequencies one would expect in the real lunar case. Using the analytical results achieved to date, a laboratory crane system is now being developed as a test bed for verifying a wide variety of mechanisms and control designs. Future development will be aimed at making the crane system a telerobotic test bed into which external sensors such as computer vision systems, and other small robotic devices such as CSC lunar rovers, will be integrated.
10. DETAIL, CAB SIDE. DETAIL, END OF BOOM. DETAIL, LOWER ...
10. DETAIL, CAB SIDE. DETAIL, END OF BOOM. DETAIL, LOWER PART OF TOWER, SHOWING METAL WHEELS AND CABLE SPOOLS. DETAIL, LOOKING UP AT THE UNDERSIDE OF THE REVOLVING PLATFORM ATOP THE TOWER. - United Engineering Company Shipyard, Crane, 2900 Main Street, Alameda, Alameda County, CA
Reliability Modeling of Double Beam Bridge Crane
NASA Astrophysics Data System (ADS)
Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li
2018-05-01
This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.
29 CFR 1926.1432 - Multiple-crane/derrick lifts-supplemental requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Multiple-crane/derrick lifts-supplemental requirements... Cranes and Derricks in Construction § 1926.1432 Multiple-crane/derrick lifts—supplemental requirements... implementation. (1) The multiple-crane/derrick lift must be directed by a person who meets the criteria for both...
29 CFR 1926.1420 - Signals-radio, telephone or other electronic transmission of signals.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CONSTRUCTION Cranes and Derricks in Construction § 1926.1420 Signals—radio, telephone or other electronic... must be through a dedicated channel, except: (1) Multiple cranes/derricks and one or more signal persons may share a dedicated channel for the purpose of coordinating operations. (2) Where a crane is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garcia-Fernandez, Ignacio; Pla-Castells, Marta; Martinez-Dura, Rafael J.
A model of a cable and pulleys is presented that can be used in Real Time Computer Graphics applications. The model is formulated by the coupling of a damped spring and a variable coefficient wave equation, and can be integrated in more complex mechanical models of lift systems, such as cranes, elevators, etc. with a high degree of interactivity.
NASA Technical Reports Server (NTRS)
Youngquist, Robert; Mata, Carlos; Cox, Robert
2005-01-01
An electronic instrument has been developed as a prototype of a portable crane-load contact sensor. Such a sensor could be helpful in an application in which the load rests on a base in a horizontal position determined by vertical alignment pins (see Figure 1). If the crane is not positioned to lift the load precisely vertically, then the load can be expected to swing once it has been lifted clear of the pins. If the load is especially heavy, large, and/or fragile, it could hurt workers and/or damage itself and nearby objects. By indicating whether the load remains in contact with the pins when it has been lifted a fraction of the length of the pins, the crane-load contact sensor helps the crane operator determine whether it is safe to lift the load clear of the pins: If there is contact, then the load is resting against the sides of the pins and, hence, it may not be safe to lift; if contact is occasionally broken, then the load is probably not resting against the pins, so it should be safe to lift. It is assumed that the load and base, or at least the pins and the surfaces of the alignment holes in the load, are electrically conductive, so the instrument can use electrical contact to indicate mechanical contact. However, DC resistance cannot be used as an indicator of contact for the following reasons: The load and the base are both electrically grounded through cables (the load is grounded through the lifting cable of the crane) to prevent discharge of static electricity. In other words, the DC resistance between the load and the pins is always low, as though they were always in direct contact. Therefore, instead of DC resistance, the instrument utilizes the AC electrical impedance between the pins and the load. The signal frequency used in the measurement is high enough (.1 MHz) that the impedance contributed by the cables and the electrical ground network of the building in which the crane and the base are situated is significantly greater than the contact impedance between the pins and the load. The instrument includes a signal generator and voltage-measuring circuitry, and is connected to the load and the base as shown in Figure 2. The output of the signal generator (typically having amplitude of the order of a volt) is applied to the load via a 50-resistor, and the voltage between the load and the pins is measured. When the load and the pins are not in contact, the impedance between them is relatively high, causing the measured voltage to exceed a threshold value. When the load and the pins are in contact, the impedance between them falls to a much lower value, causing the voltage to fall below the threshold value. The voltage-measuring circuitry turns on a red light-emitting diode (LED) to indicate the lower-voltage/ contact condition. Whenever the contact has been broken and the non-contact/higher-voltage condition has lasted for more than 2 ms, the voltage-measuring circuitry indicates this condition by blinking a green LED.
Features and perspectives of automatized construction crane-manipulators
NASA Astrophysics Data System (ADS)
Stepanov, Mikhail A.; Ilukhin, Peter A.
2018-03-01
Modern construction industry still has a high percentage of manual labor, and the greatest prospects of improving the construction process are lying in the field of automatization. In this article automatized construction manipulator-cranes are being studied in order to achieve the most rational design scheme. This is done through formulating a list of general conditions necessary for such cranes and a set of specialized kinematical conditions. A variety of kinematical schemes is evaluated via these conditions, and some are taken for further dynamical analisys. The comparative dynamical analisys of taken schemes was made and the most rational scheme was defined. Therefore a basis for a more complex and practical research of manipulator-cranes design is given and ways to implement them on practical level can now be calculated properly. Also, the perspectives of implementation of automated control systems and informational networks on construction sites in order to boost the quality of construction works, safety of labour and ecological safety are shown.
76. Photocopy of Photograph (original located in Univ. of Denver ...
76. Photocopy of Photograph (original located in Univ. of Denver collection). C.R. Savage, Photographer, date unknown. DISASSEMBLING CRANE TOWER FROM SOUTH ISLAND SPILLWAY. REMOVING CABLE TOWER. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction Pt. 1926, Subpt. CC... risk of unintended dangerous movement while the pins are removed, the A/D director uses an assist crane... place using an assist crane. The A/D director's plan is to keep the boom sections stable while they are...
29 CFR 1926.1419 - Signals-general requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in... person may give signals to a crane/derrick at a time, except in circumstances covered by paragraph (j) of... multiple cranes/derricks. Where a signal person(s) is in communication with more than one crane/derrick, a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bardal, M.A.; Darwen, N.J.
2008-07-01
Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification.more » Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)« less
36. SAR1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print ...
36. SAR-1 UNDER CONSTRUCTION, WITH WORKERS ATOP CRANE. EEC print no. N-C-01-00031, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA
Griffiths, Jamie T; Taheri, Arash; Day, Robert E; Yates, Piers J
2015-12-01
The aim of this study was to biomechanically evaluate the Locking attachment plate (LAP) construct in comparison to a Cable plate construct, for the fixation of periprosthetic femoral fractures after cemented total hip arthroplasty. Each construct incorporated a locking compression plate with bi-cortical locking screws for distal fixation. In the Cable construct, 2 cables and 2 uni-cortical locking screws were used for proximal fixation. In the LAP construct, the cables were replaced by a LAP with 4 bi-cortical locking screws. The LAP construct was significantly stiffer than the cable construct under axial load with a bone gap (P=0.01). The LAP construct offers better axial stiffness compared to the cable construct in the fixation of comminuted Vancouver B1 proximal femoral fractures. Crown Copyright © 2015. Published by Elsevier Inc. All rights reserved.
A Dyadic Interactive Approach to the Study of Leader Behavior
1975-07-01
supervisors and workers in a bogus greeting card company performed experimental tasks involving construction of " origami " cranes. The following variables...comprised of a supervisor and three workers who, in turn, were assigned the task of producing " origami " paper cranes and were paid on a piece-rate basis...behaviors as he inter- acted with his followers. Experimental Task The experimental task involved the construction of " origami " cranes from sheets of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nilles, Michael J.
A shipping container containing an unirradiated nuclear fuel assembly is lifted off the ground by operating a crane to raise a lifting tool comprising a winch. The lifting tool is connected with the shipping container by a rigging line connecting with the shipping container at a lifting point located on the shipping container between the top and bottom of the shipping container, and by winch cabling connecting with the shipping container at the top of the shipping container. The shipping container is reoriented by operating the winch to adjust the length of the winch cabling so as to rotate themore » shipping container about the lifting point. Shortening the winch cabling rotates the shipping container about the lifting point from a horizontal orientation to a vertical orientation, while lengthening the winch cabling rotates the shipping container about the lifting point from the vertical orientation to the horizontal orientation.« less
ASME Nuclear Crane Standards for Enhanced Crane Safety and Increased Profit
NASA Astrophysics Data System (ADS)
Parkhurst, Stephen N.
2000-01-01
The ASME NOG-1 standard, 'Rules for Construction of Overhead and Gantry Cranes', covers top running cranes for nuclear facilities; with the ASME NUM-1 standard, 'Rules for Construction of Cranes, Monorails, and Hoists', covering the single girder, underhung, wall and jib cranes, as well as the monorails and hoists. These two ASME nuclear crane standards provide criteria for designing, inspecting and testing overhead handling equipment with enhanced safety to meet the 'defense-in-depth' approach of the United States Nuclear Regulatory Commission (USNRC) documents NUREG 0554 and NUREG 0612. In addition to providing designs for enhanced safety, the ASME nuclear crane standards provide a basis for purchasing overhead handling equipment with standard safety features, based upon accepted engineering principles, and including performance and environmental parameters specific to nuclear facilities. The ASME NOG-1 and ASME NUM-1 standards not only provide enhanced safety for handling a critical load, but also increase profit by minimizing the possibility of load drops, by reducing cumbersome operating restrictions, and by providing the foundation for a sound licensing position. The ASME nuclear crane standards can also increase profit by providing the designs and information to help ensure that the right standard equipment is purchased. Additionally, the ASME nuclear crane standards can increase profit by providing designs and information to help address current issues, such as the qualification of nuclear plant cranes for making 'planned engineered lifts' for steam generator replacement and decommissioning.
Comparative assessment of anti-sway control strategy for tower crane system
NASA Astrophysics Data System (ADS)
Samin, Reza Ezuan; Mohamed, Zaharuddin
2017-09-01
Tower crane is also known as rotary crane and widely used in constructions due to limited human capability to carry the various types of load at the construction site. In general crane is used for the purpose of loading and unloading heavy material from one place to another. However, in order to transfer the material in minimum time from one location to another, swaying of the payload will occur. Hence, this research presents the investigation of tower crane system which mainly focusing on the swaying angle of the payload by implementing conventional and intelligent controllers. Its mathematical modeling is developed using the Newton's Second Law and simulation is done within the MATLAB/Simulink environment. Simulation results are presented in cart trajectory capability and payload sway angle reduction. A comparative assessment between conventional controller and intelligent controller for the tower crane system are presented and discussed. Furthermore, the effect of various rope length and payload mass of the tower crane system to the performance of trajectory capability and sway angle reduction are also presented and discussed.
Monitoring the effects of highway construction over the Little River and Crane Creek.
DOT National Transportation Integrated Search
2005-09-08
This report summarizes the results of a two-year water quality monitoring project to document the effects of : the construction of the Highway 1 bypass on the water quality of Crane (Crains) Creek and the Little River. : Automated monitoring equipmen...
STS-101: Crew Activity Report CAR/Flight Day 04 Highlights
NASA Technical Reports Server (NTRS)
2000-01-01
On this fourth day of the STS-101 Atlantis mission, the flight crew, Commander James D. Halsell Jr., Pilot Scott J. Horowitz, and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev are seen performing final preparations for the scheduled space walk. Horowitz, Williams and Voss are seen in the mid-deck before the space walk. Horowitz and Weber are also seen in the flight deck, powering-up the robot-arm. During the space walk Voss is seen checking the American Cargo Crane-Orbital Replacement Unit Transfer Device. Voss and Williams are shown securing the American-built crane that was installed on the station last year. They are seen as they install the final parts (boom extension) of a Russian-built crane on the station. Voss and Williams are also shown as they replace a faulty antenna for one of the station's communications systems on the Unity Module, and install several handrails and a camera cable on the station's exterior.
NASA Astrophysics Data System (ADS)
Maghsoudi, Mohammad Javad; Mohamed, Z.; Sudin, S.; Buyamin, S.; Jaafar, H. I.; Ahmad, S. M.
2017-08-01
This paper proposes an improved input shaping scheme for an efficient sway control of a nonlinear three dimensional (3D) overhead crane with friction using the particle swarm optimization (PSO) algorithm. Using this approach, a higher payload sway reduction is obtained as the input shaper is designed based on a complete nonlinear model, as compared to the analytical-based input shaping scheme derived using a linear second order model. Zero Vibration (ZV) and Distributed Zero Vibration (DZV) shapers are designed using both analytical and PSO approaches for sway control of rail and trolley movements. To test the effectiveness of the proposed approach, MATLAB simulations and experiments on a laboratory 3D overhead crane are performed under various conditions involving different cable lengths and sway frequencies. Their performances are studied based on a maximum residual of payload sway and Integrated Absolute Error (IAE) values which indicate total payload sway of the crane. With experiments, the superiority of the proposed approach over the analytical-based is shown by 30-50% reductions of the IAE values for rail and trolley movements, for both ZV and DZV shapers. In addition, simulations results show higher sway reductions with the proposed approach. It is revealed that the proposed PSO-based input shaping design provides higher payload sway reductions of a 3D overhead crane with friction as compared to the commonly designed input shapers.
Square-lashing technique in segmental spinal instrumentation: a biomechanical study.
Arlet, Vincent; Draxinger, Kevin; Beckman, Lorne; Steffen, Thomas
2006-07-01
Sublaminar wires have been used for many years for segmental spinal instrumentation in scoliosis surgery. More recently, stainless steel wires have been replaced by titanium cables. However, in rigid scoliotic curves, sublaminar wires or simple cables can either brake or pull out. The square-lashing technique was devised to avoid complications such as cable breakage or lamina cutout. The purpose of the study was therefore to test biomechanically the pull out and failure mode of simple sublaminar constructs versus the square-lashing technique. Individual vertebrae were subjected to pullout testing having one of two different constructs (single loop and square lashing) using either monofilament wire or multifilament cables. Four different methods of fixation were therefore tested: single wire construct, square-lashing wiring construct, single cable construct, and square-lashing cable construct. Ultimate failure load and failure mechanism were recorded. For the single wire the construct failed 12/16 times by wire breakage with an average ultimate failure load of 793 N. For the square-lashing wire the construct failed with pedicle fracture in 14/16, one bilateral lamina fracture, and one wire breakage. Ultimate failure load average was 1,239 N For the single cable the construct failed 12/16 times due to cable breakage (average force 1,162 N). 10/12 of these breakages were where the cable looped over the rod. For the square-lashing cable all of these constructs (16/16) failed by fracture of the pedicle with an average ultimate failure load of 1,388 N. The square-lashing construct had a higher pullout strength than the single loop and almost no cutting out from the lamina. The square-lashing technique with cables may therefore represent a new advance in segmental spinal instrumentation.
Development and preclinical testing of a new tension-band device for the spine: the Loop system.
Garner, Matthew D; Wolfe, Steven J; Kuslich, Stephen D
2002-10-01
Wire sutures, cerclage constructs, and tension bands have been used for many years in orthopedic surgery. Spinous process and sublaminar wires and other strands or cables are used in the spine to re-establish stability of the posterior spinal ligament complex. Rigid monofilament wires often fail due to weakening created during twisting or wrapping. Stronger metal cables do not conform well to bony surfaces. Polyethylene cables have higher fatigue strength than metal cables. The Loop cable is a pliable, radiolucent, polyethylene braid. Creep of the Loop/locking clip construct is similar to metal cable constructs using crimps. Both systems have less creep than knotted polyethylene cable constructs.
Sun, Edward; Alkalay, Ron; Vader, David; Snyder, Brian D
2009-06-01
An in vitro biomechanical study. Compare the mechanical behavior of 5 different constructs used to terminate dual-rod posterior spinal instrumentation in resisting forward flexion moment. Failure of the distal fixation construct can be a significant problem for patients undergoing surgical treatment for thoracic hyperkyphosis. We hypothesize that augmenting distal pedicle screws with infralaminar hooks or sublaminar cables significantly increases the strength and stiffness of these constructs. Thirty-seven thoracolumbar (T12 to L2) calf spines were implanted with 5 configurations of distal constructs: (1) infralaminar hooks, (2) sublaminar cables, (3) pedicle screws, (4) pedicle screws+infralaminar hooks, and (5) pedicle screws+sublaminar cables. Progressive bending moment was applied to each construct until failure. The mode of failure was noted and the construct's stiffness and failure load determined from the load-displacement curves. Bone density and vertebral dimensions were equivalent among the groups (F=0.1 to 0.9, P>0.05). One-way analysis of covariance (adjusted for differences in density and vertebral dimension) demonstrated that all of the screw-constructs (screw, screw+hook, and screw+cable) exhibited significantly higher stiffness and ultimate failure loads compared with either sublaminar hook or cable alone (P<0.05). The screw+hook constructs (109+/-11 Nm/mm) were significantly stiffer than either screws alone (88+/-17 Nm/mm) or screw+cable (98+/-13 Nm/mm) constructs, P<0.05. Screw+cable construct exhibited significantly higher failure load (1336+/-328 N) compared with screw constructs (1102+/-256 N, P<0.05), whereas not statistically different from the screw+hook construct (1220+/-75 N). The cable and hook constructs failed by laminar fracture, screw construct failed in uniaxial shear (pullout), whereas the screws+(hooks or wires) failed by fracture of caudal vertebral body. Posterior dual rod constructs fixed distally using pedicle screws were stiffer and stronger in resisting forward flexion compared with cables or hooks alone. Augmenting these screws with either infralaminar hooks or sublaminar cables provided additional resistance to failure.
NASA Astrophysics Data System (ADS)
Korytov, M. S.; Shcherbakov, V. S.; Titenko, V. V.
2018-01-01
Limitation of the swing of the bridge crane cargo rope is a matter of urgency, as it can significantly improve the efficiency and safety of the work performed. In order to completely dampen the pendulum swing after the break-up of a bridge or a bridge-crane freight cart to maximum speed, it is necessary, in the normal repulsion control of the electric motor, to split the process of dispersion into a minimum of three gaps. For a dynamic system of swinging of a bridge crane on a flexible cable hanger in a separate vertical plane, an analytical solution was obtained to determine the temporal dependence of the cargo rope angle relative to the gravitational vertical when the cargo suspension point moves with constant acceleration. The resulting analytical dependence of the cargo rope angle and its first derivative can break the process of dispersing the cargo suspension point into three stages of dispersal and braking with various accelerations and enter maximum speed of movement of the cargo suspension point. In doing so, the condition of eliminating the swings of the cargo rope relative to the gravitational vertical is fulfilled. Provides examples of the maximum speed output constraints-to-time when removing the rope swing.
Investigation of the strength of shielded and unshielded underwater electrical cables
NASA Astrophysics Data System (ADS)
Glowe, D. E.; Arnett, S. L.
1981-09-01
The mechanical properties of shielded and unshielded submarine cables (MIL-C-915/8E) were investigated to determine the effect of shielding on cable life, performance, and reliability. Ten cables (five shielded and five unshielded) were selected for laboratory evaluation. A mission profile was developed to establish the mechanical stress limits that cables must endure in service and a test sequence designed to measure tensile strength, flexural abrasion endurance, crush resistance, creep under static tension, and performance in a hull-stuffing tube. The results of this program showed that: (1) DSS-2 cable does not have adequate tensile strength and should have a strength member added. DSS-3 and larger cables have adequate tensile strength with or without the shield; (2) Unshielded DSS-3 type cable does not perform satisfactorily in hull-stuffing tubes; (3) Shielding is not required to meet mission profile specifications for cable crush or flexural abrasion resistance; (4) Construction parameters other than shielding can significantly affect mechanical performance of cable; (5) Unshielded cable construction can result in increased reliability since it permits a thicker single-jacket construction; and (6) Unshielded cable construction can reduce the cost of cable by 8 to 20 percent.
29 CFR 1926.1428 - Signal person qualifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in... operation and limitations, including the crane dynamics involved in swinging and stopping loads and boom...
NASA Astrophysics Data System (ADS)
Tuan, Le Anh; Lee, Soon-Geul
2018-03-01
In this study, a new mathematical model of crawler cranes is developed for heavy working conditions, with payload-lifting and boom-hoisting motions simultaneously activated. The system model is built with full consideration of wind disturbances, geometrical nonlinearities, and cable elasticities of cargo lifting and boom luffing. On the basis of this dynamic model, three versions of sliding mode control are analyzed and designed to control five system outputs with only two inputs. When used in complicated operations, the effectiveness of the controllers is analyzed using analytical investigation and numerical simulation. Results indicate the effectiveness of the control algorithms and the proposed dynamic model. The control algorithms asymptotically stabilize the system with finite-time convergences, remaining robust amid disturbances and parametric uncertainties.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and... sections located between the pendant attachment points and the crane/derrick body are to be removed (partly... sections located between the uppermost boom section and the crane/derrick body are to be removed (partly or...
Towards a Better Understanding of Carbon Flux
ERIC Educational Resources Information Center
Asshoff, Roman; Riedl, Susanna; Leuzinger, Sebastian
2010-01-01
In March 1999, a ca. 45 m tall construction crane was installed in a highly diverse, mature temperate forest near the village of Hofstetten, south of Basel (Swiss Canopy Crane project, Switzerland). The crane provides access to the canopy using a gondola for in situ research. With a new type of FACE technique (Free Air CO[subscript 2] Enrichment),…
System Certification Procedures and Criteria Manual for Deep Submergence Systems
1973-07-01
Certification Milestone Events. The applicant and SCA interplay and negotiations between milestones is stressed . Effective and frequent communication...a series of events beginning with a single failure, often relatively minor, which may place the DSq Personnel or equipments under additional stresses ...for the particular DSS. p. Support ship handling system components such as cranes , brakes, and cables when the DSS is handled with personnel aboard. q
Application and research of recyclable cables in foundation pit support engineering
NASA Astrophysics Data System (ADS)
Zheng, Suping
2018-05-01
Anchoring cables are widely used in the construction of foundation pit as a temporary support structure. After the construction is completed, the anchor cables left in the ground will not only cause environmental pollution but also cause a great waste of resources. The emergence of recyclable cable technology, to avoid such problems, to achieve the secondary use of the anchor cable, excavation in the excavation project is more and more widely used. Combined with the design and construction of recoverable anchor cable in engineering practice, the application effect of recoverable anchor cable in foundation pit support is analyzed, and the conclusion that the support effect of recoverable anchor cable is stable and safe can be obtained Recyclable anchor cable in the future support projects to provide a reference.
NASA Technical Reports Server (NTRS)
1976-01-01
The Bendix Corp., with the help of NASA's Kennedy Space Center, developed a tool to equalize tensions in the 150 cables of the ceiling. This inexpensive tool used in concert halls was developed first for elevator and crane cables used to lift heavy space vehicles. University of Akron's performing arts hall has been developed to shrink and expand to accommodate audiences as large as 3,000 and as small as 900. Once the hall has been sound tuned, various positions of this ingenious ceiling and related acoustic curtains may be called into play immediately by pushing buttons on a control console programmed previously. With the touch of a finger before an event, a technician may condition the hall for chamber music, symphony, or theater.
2009-02-13
CAPE CANAVERAL, Fla. – At the Hazardous Processing Facility at Astrotech in Titusville, Fla., workers attach cables from the overhead crane onto the Kepler spacecraft. The crane will lift and weigh the spacecraft. Kepler is designed to survey more than 100,000 stars in our galaxy to determine the number of sun-like stars that have Earth-size and larger planets, including those that lie in a star's "habitable zone," a region where liquid water, and perhaps life, could exist. If these Earth-size worlds do exist around stars like our sun, Kepler is expected to be the first to find them and the first to measure how common they are. The liftoff of Kepler aboard a Delta II rocket is currently targeted for 10:48 p.m. EST March 5 from Space Launch Complex 17 on Cape Canaveral Air Force Station. Photo credit: NASA/Jim Grossmann
Large Crawler Crane for new lightning protection system
2007-10-25
A large crawler crane traveling long one of the crawlerway tracks makes the turn toward Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
Large Crawler Crane for new lightning protection system
2007-10-25
A large crawler crane travels along one of the crawlerway tracks on its way to Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
Large Crawler Crane for new lightning protection system
2007-10-25
A large crawler crane moves past the Vehicle Assembly Building on its way to Launch Pad 39B. The crane with its 70-foot boom will be used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
78 FR 13709 - Advisory Committee on Construction Safety and Health (ACCSH)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... corrections to the Cranes and Derricks standards. DATES: ACCSH meeting: The ACCSH will meet from 1 to 4:00 p.m... Proposed technical amendments and corrections OSHA's Cranes and Derricks standards (29 CFR part 1926...
LPT. Low power test (TAN640 and641) sections. Referent drawing is ...
LPT. Low power test (TAN-640 and-641) sections. Referent drawing is HAER ID-33-E-292. Section A shows cable tunnel between reactor cells and control room. Bridge crane, roof, ladder details. Ralph M. Parsons 1229-12 ANP/GE-7-640-A-3. November 1956. Approved by INEEL Classification Office for public release. INEEL index code no. 038-0640-00-693-107276 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
High-performance, lightweight coaxial cable from carbon nanotube conductors.
Jarosz, Paul R; Shaukat, Aalyia; Schauerman, Christopher M; Cress, Cory D; Kladitis, Paul E; Ridgley, Richard D; Landi, Brian J
2012-02-01
Coaxial cables have been constructed with carbon nanotube (CNT) materials serving as both the inner and outer conductors. Treatment of the CNT outer and inner conductors with KAuBr(4) was found to significantly reduce the attenuation of these cables, which demonstrates that chemical agents can be used to improve power transmission through CNT networks at high frequencies (150 kHz-3 GHz). For cables constructed with a KAuBr(4)-treated CNT outer conductor, power attenuation per length approaches parity with cables constructed from metallic conductors at significantly lower weight per length (i.e., 7.1 g/m for CNT designs compared to 38.8 g/m for an RG-58 design). A relationship between the thickness of the CNT outer conductor and the cable attenuation was observed and used to estimate the effective skin depth at high frequency. These results establish reliable, reproducible methods for the construction of coaxial cables from CNT materials that can facilitate further investigation of their performance in high-frequency transmission structures, and highlight a specific opportunity for significant reduction in coaxial cable mass.
Large Crawler Crane for new lightning protection system
2007-10-25
A large crawler crane arrives at the turn basin at the Launch Complex 39 Area on NASA's Kennedy Space Center. The crane with its 70-foot boom will be moved to Launch Pad 39B and used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
NASA Astrophysics Data System (ADS)
Nara, Shunsuke; Takahashi, Satoru
In this paper, what we want to do is to develop an observation device to measure the working radius of a crane truck. The device has a single CCD camera, a laser range finder and two AC servo motors. First, in order to measure the working radius, we need to consider algorithm of a crane hook recognition. Then, we attach the cross mark on the crane hook. Namely, instead of the crane hook, we try to recognize the cross mark. Further, for the observation device, we construct PI control system with an extended Kalman filter to track the moving cross mark. Through experiments, we show the usefulness of our device including new control system of mark tracking.
A&M. TAN607 sections. Section C cuts hot shop on its ...
A&M. TAN-607 sections. Section C cuts hot shop on its 160-foot east/west line. Shows tapered shield wall on east and west facades of building. Relationship between hot shop and special equipment service room, cable tracks for overhead bridge crane, location of well. Concrete roof beams. Section D shows similar east/west of cold assembly room 115 and its bridge crane rail. Shows heavy shielding around special services cubicle and height of viewing windows on east and west sides. Rear of building is shown in relationship to the ridge east of the building. Referent drawing is ID-33-E-158 above. Ralph M. Parsons 902-3-ANP-607-A 106. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-00-693-106758 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
DOT National Transportation Integrated Search
1991-01-01
During the construction of the I-295 cable-stayed bridge, a number of the stays on the main span cantilever were instrumented with electrical resistance strain gages mounted directly on the wires of the seven-wire strands making up the stay cables. M...
Large Crawler Crane for new lightning protection system
2007-10-25
A large crawler crane begins moving away from the turn basin at the Launch Complex 39 Area on NASA's Kennedy Space Center. The crane with its 70-foot boom will be moved to Launch Pad 39B and used to construct a new lightning protection system for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
1998-11-06
Workers in the Space Station Processing Facility watch as cables and a crane lift the Passive Common Berthing Mechanism (PCBM) before mating it to the Z1 integrated truss structure, a component of the International Space Station (ISS). The Z1 truss will be used for the temporary installation of the P6 truss segment to the Unity connecting module. The P6 truss segment contains the solar arrays and batteries which will provide early station power. The truss is scheduled to be launched aboard STS-92 in late 1999
2007-06-01
HOISTS, CRANES AND DERRICKS ο ο Cables and sheaves regularly inspected ο ο Slings and chains, hooks and eyes inspected before each use ο ο Equipment...osion from soil corrosion, bacterial corrosion, and stress corrosion cracking. • Cathodic protection is applicable over a wide range of e...should be flat against the material. Bent rivets will fail under stress . Especially note condition of Dee Ring rivets and Dee Ring metal wear pads
Lester Crane: Getting Approvals After the Fact.
ERIC Educational Resources Information Center
Schaub, Mark F.
1998-01-01
Presents a case study for use in business communication classes to help students understand and learn both the context and the strategies for communication with business and management. Discusses planning required to do business (selling speciality construction cranes) in the Middle East. Includes some correspondence and two assignments. (SR)
75 FR 47905 - Cranes and Derricks in Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
... guiding a large roof section, being lifted by another crane, into place. Winds gusting to 27 miles per... wind and other adverse weather conditions on the equipment's stability and rated capacity. In addition, Sec. 1926.1431, Hoisting personnel, requires that, when wind speed (sustained or gust) exceeds 20 mph...
Code of Federal Regulations, 2011 CFR
2011-07-01
... loaders. This machinery is also excluded when used with chains, slings or other rigging to lift suspended... that deliver material to a construction site when the crane is used to transfer building supply sheet goods or building supply packaged materials from the truck crane onto a structure, using a fork/cradle...
30 CFR 7.403 - Application requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Cables, Signaling Cables, and Cable Splice Kits § 7.403 Application requirements. (a) Electric cables and signaling cables. A single... product: (1) Product information: (i) Cable type (for example, G or G-GC). (ii) Construction (for example...
30 CFR 7.403 - Application requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Cables, Signaling Cables, and Cable Splice Kits § 7.403 Application requirements. (a) Electric cables and signaling cables. A single... product: (1) Product information: (i) Cable type (for example, G or G-GC). (ii) Construction (for example...
30 CFR 7.403 - Application requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Cables, Signaling Cables, and Cable Splice Kits § 7.403 Application requirements. (a) Electric cables and signaling cables. A single... product: (1) Product information: (i) Cable type (for example, G or G-GC). (ii) Construction (for example...
NASA Technical Reports Server (NTRS)
Doggett, William R.; King, Bruce D.; Jones, Thomas Carno; Dorsey, John T.; Mikulas, Martin M.
2008-01-01
Devices for lifting, translating and precisely placing payloads are critical for efficient Earthbased construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Lunar payloads include: a) prepackaged hardware and supplies which must be unloaded from landers and then accurately located at their operational site, b) sensor packages used for periodic inspection of landers, habitat surfaces, etc., and c) local materials such as regolith which require grading, excavation and placement. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) composite components, b) compact packaging for launch, c) simple in-field reconfiguration and repair, and d) support for tele-operated or automated operations. Also, in contrast to Earth-based construction, where special purpose devices dominate a construction site, a lunar outpost will require versatile devices which provide operational benefit from initial construction through sustained operations. This paper will detail the design of a unique, high performance, versatile lifting device designed for operations on the lunar surface. The device is called the Lunar Surface Manipulation System to highlight the versatile nature of the device which supports conventional cable suspended crane operations as well as operations usually associated with a manipulator such as precise positioning where the payload is rigidly grappled by a tool attached to the tip of the device. A first generation test-bed to verify design methods and operational procedures is under development at the NASA Langley Research Center and recently completed field tests at Moses Lake Washington. The design relied on non-linear finite element analysis which is shown to correlate favorably with laboratory experiments. A key design objective, reviewed in this paper, is the device s simplicity, resulting from a focus on the minimum set of functions necessary to perform payload offload. Further development of the device has the potential for significant mass savings, with a high performance device incorporating composite elements estimated to have a mass less than 3% of the mass of the maximum lunar payload lifted at the tip. The paper will conclude with future plans for expanding the operational versatility of the device.
20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION ...
20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION BRIDGE, GANTRY CRANE AND STRUCTURAL PIERS. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
14 CFR 25.689 - Cable systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a) Each cable, cable fitting, turnbuckle, splice, and pulley must be approved. In addition— (1) No cable... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Cable systems. 25.689 Section 25.689...
Spasojević Brkić, Vesna K; Veljković, Zorica A; Golubović, Tamara; Brkić, Aleksandar Dj; Kosić Šotić, Ivana
2016-01-01
Procedures in the development process of crane cabins are arbitrary and subjective. Since approximately 42% of incidents in the construction industry are linked to them, there is a need to collect fresh anthropometric data and provide additional recommendations for design. In this paper, dimensioning of the crane cabin interior space was carried out using a sample of 64 crane operators' anthropometric measurements, in the Republic of Serbia, by measuring workspace with 10 parameters using nine measured anthropometric data from each crane operator. This paper applies experiments run via full factorial designs using a combined traditional and Taguchi approach. The experiments indicated which design parameters are influenced by which anthropometric measurements and to what degree. The results are expected to be of use for crane cabin designers and should assist them to design a cabin that may lead to less strenuous sitting postures and fatigue for operators, thus improving safety and accident prevention.
Analytical and numerical construction of equivalent cables.
Lindsay, K A; Rosenberg, J R; Tucker, G
2003-08-01
The mathematical complexity experienced when applying cable theory to arbitrarily branched dendrites has lead to the development of a simple representation of any branched dendrite called the equivalent cable. The equivalent cable is an unbranched model of a dendrite and a one-to-one mapping of potentials and currents on the branched model to those on the unbranched model, and vice versa. The piecewise uniform cable, with a symmetrised tri-diagonal system matrix, is shown to represent the canonical form for an equivalent cable. Through a novel application of the Laplace transform it is demonstrated that an arbitrary branched model of a dendrite can be transformed to the canonical form of an equivalent cable. The characteristic properties of the equivalent cable are extracted from the matrix for the transformed branched model. The one-to-one mapping follows automatically from the construction of the equivalent cable. The equivalent cable is used to provide a new procedure for characterising the location of synaptic contacts on spinal interneurons.
In vitro biomechanical comparison of multistrand cables with conventional cervical stabilization.
Weis, J C; Cunningham, B W; Kanayama, M; Parker, L; McAfee, P C
1996-09-15
The biomechanical stability of six different methods of cervical spine stabilization, three using multistrand cables, were evaluated in a bovine model. To quantify and compare the in vitro biomechanical properties of multistrand cables used for posterior cervical wiring to standard cervical fixation techniques. Fixation of the posterior cervical spine with monofilament stainless steel wire is a proven technique for stabilization of the cervical spine. Recently, multistrand braided cables have been used as a substitute for monofilament stainless steel wires. These cables, made of stainless steel, titanium, or polyethylene, are reported to be stronger, more flexible, and fatigue resistant than are monofilament wire based on mechanical testing. However, no in vitro biomechanical studies have been performed testing a standard posterior cervical wiring technique using multistrand cables. Thirty-six fresh frozen cervical calf spines consistent in size and age were mounted and fixed rigidly to isolate the C4-C5 motion segment. Six different reconstruction techniques were evaluated for Rogers' posterior cervical wiring technique using: 1) 20-gauge stainless steel monofilament wire, 2) stainless steel cable, 3) titanium cable, 4) polyethylene cables, 5) anterior locking plate construct with interbody graft, and 6) posterior plate construct. Six cervical spines were included in each group (n = 6), with each specimen statically evaluated under three stability conditions: 1) intact, 2) reconstructed, and 3) postfatigue. The instability model created before the reconstruction consisted of a distractive flexion Stage 3 injury at C4-C5. Nondestructive static biomechanical testing, performed on an material testing machine (MTS 858 Bionix test system, Minneapolis, MN), included axial compression, axial rotation, flexion-extension, and lateral bending. After reconstruction and static analysis, the specimens were fatigued for 1500 cycles and then statically retested. Data analysis included normalization of the reconstructed and postfatigue data to the intact condition. The calculated static parameters included operative functional unit stiffness and range of motion. Posterior cervical reconstruction with stainless steel monofilament wire proved inadequate under fatigue testing. Two of the six specimens failed with fatigue, and this construct permitted the greatest degree of flexion-extension motion after fatigue in comparison with all other constructs (P < 0.05). There were no significant differences in flexural stiffness or range of motion between stainless steel, titanium, or polyethylene cable constructs before or after fatigue testing. The posterior cervical plate constructs were the stiffest constructs under flexion, extension, and lateral bending modes, before and after fatigue testing (P < 0.05). Multistrand cables were superior to monofilament wire with fatigue testing using an in vitro calf cervical spine model. There were no failures or detectable differences in elongation after fatigue testing between the stainless steel, titanium, and polyethylene cables, as shown by the flexion-extension range of motion. The posterior cervical plate construct offered the greatest stability compared with all other constructs.
6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND ...
6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND MOUNDED BUNKER. CONSTRUCTION WAS 99 PERCENT COMPLETE. CAMERA IS FACING WEST. INEL PHOTO NUMBER 65-5435, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
30 CFR 28.40 - Construction and performance requirements; general.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Construction, Performance, and Testing Requirements... for use with direct current in providing short-circuit protection for trailing cables, when such fuses...
NASA Astrophysics Data System (ADS)
Sugihardjo, H.; Tavio; Prasetya, D.; Achmad, N. I.
2017-11-01
The impact of temperature change could govern the final stress of structural elements in the long-span steel bridges. The study was conducted to investigate the effect of temperature change during the construction of a new steel arch bridge, namely the Kutai Kartanegara Bridge. The main bridge has a total spanning length of 470 meters. The erection method of the bridge was the cantilever method with temporary towers, mast cranes, and stay cables. The deflections and internal forces of the steel elements were analyzed using the Midas Civil software. The study focuses on the effort to find the perfect erection time for the closure with regards to the temperature. By measuring the temperatures of the steel elements during the construction, it was found that they varied between 19 and 64 degrees Celsius. From the results of the analyses with various temperatures, it can be concluded that the recommended temperature for the closure erection was 44.6 degrees Celsius. This temperature is similar with the air temperature between either 6 AM and 12 noon or 12 noon and 6 PM. During this periods of time, the effect of thermal stress on the final internal forces in the bridge elements was found much lesser than those obtained during any other period of time.
46 CFR 111.60-13 - Flexible electric cord and cables.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Flexible electric cord and cables. 111.60-13 Section 111... cables. (a) Construction and testing. Each flexible cord and cable must meet the requirements in section.... Each flexible cord must be No. 18 AWG (0.82 mm2) or larger. (e) Splices. Each flexible cord and cable...
Onboard photo: Astronauts at work
NASA Technical Reports Server (NTRS)
1997-01-01
Onboard Space Shuttle Columbia's (STS-87) first ever Extravehicular Activity (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future space walkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott, mission specialist, had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations after completing a contingency EVA to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).
1997-11-19
Onboard Space Shuttle Columbia's (STS-87) first ever Extravehicular Activity (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future space walkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott, mission specialist, had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations after completing a contingency EVA to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).
Large ORU/ Crane evaluations conducted during first EVA of STS-87 (DTO 671)
1997-11-25
STS087-718-073 (19 November ? 5 December 1997) --- On the Space Shuttle Columbia's first ever spacewalk (EVA), astronaut Winston E. Scott works with a simulated battery and 156-pound crane carried onboard for the first time this trip of Columbia. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the ISS. This crane device is designed to aid future spacewalkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier, astronauts Takao Doi (at the base of the crane, out of frame at right), an international mission specialist representing Japan, and Winston E. Scott had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations, long ago manifest for this mission, after completing a contingency spacewalk to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).
29 CFR 1926.1433 - Design, construction and testing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...
29 CFR 1926.1433 - Design, construction and testing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...
29 CFR 1926.1433 - Design, construction and testing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...
29 CFR 1926.1433 - Design, construction and testing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...
NASA Astrophysics Data System (ADS)
Chen, Wenzhao; Cui, Wenping
2018-03-01
The SMW method has many advantages, such as little influence on the surrounding environment, good watertight performance, wide range of application, short construction period, low cost and so on. In this paper, we chose the SMW engineering method combined with anchor cable to support structure in the second phase deep foundation pit of Jinan LuJinDongCheng as the research object, monitored and analysed the horizontal displacement of the pile top, Peripheral surface subsidence and internal force of the anchor cable in the foundation pit. We also discussed the displacement, internal force of anchor cable and the settlement of surrounding environment in the excavation of foundation pit and in different stages of construction. Conclusion:(1)The maximum horizontal displacement of the retaining structure is closely related to the depth and time of excavation, the construction of anchor cable can well limit the deformation of pile body; (2)Groundwater seepage caused by foundation pit dewatering will change the effective stress of soil. The change of groundwater level has an important influence on the working behavior of smw anchor cable supporting structure.
Zhong, Dexing; Lv, Hongqiang; Han, Jiuqiang; Wei, Quanrui
2014-01-01
The so-called Internet of Things (IoT) has attracted increasing attention in the field of computer and information science. In this paper, a specific application of IoT, named Safety Management System for Tower Crane Groups (SMS-TC), is proposed for use in the construction industry field. The operating status of each tower crane was detected by a set of customized sensors, including horizontal and vertical position sensors for the trolley, angle sensors for the jib and load, tilt and wind speed sensors for the tower body. The sensor data is collected and processed by the Tower Crane Safety Terminal Equipment (TC-STE) installed in the driver's operating room. Wireless communication between each TC-STE and the Local Monitoring Terminal (LMT) at the ground worksite were fulfilled through a Zigbee wireless network. LMT can share the status information of the whole group with each TC-STE, while the LMT records the real-time data and reports it to the Remote Supervision Platform (RSP) through General Packet Radio Service (GPRS). Based on the global status data of the whole group, an anti-collision algorithm was executed in each TC-STE to ensure the safety of each tower crane during construction. Remote supervision can be fulfilled using our client software installed on a personal computer (PC) or smartphone. SMS-TC could be considered as a promising practical application that combines a Wireless Sensor Network with the Internet of Things. PMID:25196106
Zhong, Dexing; Lv, Hongqiang; Han, Jiuqiang; Wei, Quanrui
2014-07-30
The so-called Internet of Things (IoT) has attracted increasing attention in the field of computer and information science. In this paper, a specific application of IoT, named Safety Management System for Tower Crane Groups (SMS-TC), is proposed for use in the construction industry field. The operating status of each tower crane was detected by a set of customized sensors, including horizontal and vertical position sensors for the trolley, angle sensors for the jib and load, tilt and wind speed sensors for the tower body. The sensor data is collected and processed by the Tower Crane Safety Terminal Equipment (TC-STE) installed in the driver's operating room. Wireless communication between each TC-STE and the Local Monitoring Terminal (LMT) at the ground worksite were fulfilled through a Zigbee wireless network. LMT can share the status information of the whole group with each TC-STE, while the LMT records the real-time data and reports it to the Remote Supervision Platform (RSP) through General Packet Radio Service (GPRS). Based on the global status data of the whole group, an anti-collision algorithm was executed in each TC-STE to ensure the safety of each tower crane during construction. Remote supervision can be fulfilled using our client software installed on a personal computer (PC) or smartphone. SMS-TC could be considered as a promising practical application that combines a Wireless Sensor Network with the Internet of Things.
NASA Astrophysics Data System (ADS)
1983-01-01
FMC Corporation conducts extensive proof lift tests and computerized analysis to insure that the cranes can lift rated capacity loads up to one million pounds in a wide range of applications. In their analysis work, engineers makes use of a computer program supplied by COSMIC. Called Analysis of Beam Columns, the program is used as part of the required analysis for determining bending moments, deflections and critical load for latticed crane booms.
TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane ...
TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane girder section. No architect noted. Drawn by Penney. Plan no. 2-N-7. March 10, 1942, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA
Cabling design of booster and storage ring construction progress of TPS
NASA Astrophysics Data System (ADS)
Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, b.-S.
2017-06-01
The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.
2011-03-21
VANDENBERG AIR FORCE BASE, Calif. -- Workers attach cables from an overhead crane to the United Launch Alliance Delta II second stage motor for mating to the first stage at NASA's Space Launch Complex-2 (SLC-2) at Vandenberg Air Force Base in California. Following final tests, the Aquarius/SAC-D spacecraft will be integrated to the Delta II launch vehicle in preparation for the targeted June liftoff. Aquarius, the NASA-built instrument on the SAC-D spacecraft will provide new insights into how variations in ocean surface salinity relate to fundamental climate processes on its three-year mission. Photo credit: NASA/VAFB
14 CFR 25.689 - Cable systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a... cable system must be designed so that there will be no hazardous change in cable tension throughout the... subject to load or motion and retained only by cotter pins may not be used in the control system. (e...
14 CFR 25.689 - Cable systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a... cable system must be designed so that there will be no hazardous change in cable tension throughout the... subject to load or motion and retained only by cotter pins may not be used in the control system. (e...
14 CFR 25.689 - Cable systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a... cable system must be designed so that there will be no hazardous change in cable tension throughout the... subject to load or motion and retained only by cotter pins may not be used in the control system. (e...
14 CFR 25.689 - Cable systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a... cable system must be designed so that there will be no hazardous change in cable tension throughout the... subject to load or motion and retained only by cotter pins may not be used in the control system. (e...
Large ORU/ Crane evaluations conducted during first EVA of STS-87 (DTO 671)
1997-11-25
STS087-718-069 (19 November ? 5 December 1997) --- On the Space Shuttle Columbia's first ever spacewalk (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time this trip of Columbia. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future spacewalkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations, long ago manifest for this mission, after completing a contingency spacewalk to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).
NASA Astrophysics Data System (ADS)
Yamaguchi, S.; Ivanov, Y.; Watanabe, H.; Chikumoto, N.; Koshiduka, H.; Hayashi, K.; Sawamura, T.
Ishikari project constructs two lines. The length of the Line 1 is 500 m, and connects the photovoltaic cell to the internet-data center. The other line is 1 km length, and it is a test facility and called Line 2. The structures of the cable systems are not same to test their performance. The construction was started from 2014 in the field, the Line 1 was completed in May 2015, and it was cooled down and do the current experiment, and warmed up. The Line 2 is almost complete in October 2015. It will be tested in November and December, 2015. In order to reduce the stress of the cable induced by the thermal expansion and contraction, we adopted the way of the helical deformation of the cable. The force of the cable is reduced to 1/3 of an usual cable test. Because the cryogenic pipes are welded in the field and we cannot use the baking of the vacuum chamber of the cryogenic pipe, a new vacuum pumping method was proposed and tested for the cryogenic pipe. Since the straight pipes are used to compose the cryogenic pipe, the pressure drop of the circulation would be 1/100 of the corrugated pipe in the present condition, and it is suitable for longer cable system. The heat leak of the cryogenic pipe is ∼1.4W/m including the cable pipe's and the return pipe's. The heat leak of the current lead is ∼30W/kA in the test bench. Finally the current of 6kA/3 sec and the current of 5kA/15 min were achieved in Line 1. The reduction of heat leak will be a major subject of the longer cable system. The cost of the construction will be almost twice higher than that of the copper and aluminum over-head line with the iron tower in the present Japan. The cost construction of the over-head line is an average value, and depends on the newspaper.
DOT National Transportation Integrated Search
2015-08-01
In post-tensioning construction, steel cables : running through PVC pipes buried in concrete : construction components are subjected to a high : level of tension and then secured. This gives the : component significant strength, allowing bridge : spa...
Hamiltonian models for topological phases of matter in three spatial dimensions
NASA Astrophysics Data System (ADS)
Williamson, Dominic J.; Wang, Zhenghan
2017-02-01
We present commuting projector Hamiltonian realizations of a large class of (3 + 1)D topological models based on mathematical objects called unitary G-crossed braided fusion categories. This construction comes with a wealth of examples from the literature of symmetry-enriched topological phases. The spacetime counterparts to our Hamiltonians are unitary state sum topological quantum fields theories (TQFTs) that appear to capture all known constructions in the literature, including the Crane-Yetter-Walker-Wang and 2-Group gauge theory models. We also present Hamiltonian realizations of a state sum TQFT recently constructed by Kashaev whose relation to existing models was previously unknown. We argue that this TQFT is captured as a special case of the Crane-Yetter-Walker-Wang model, with a premodular input category in some instances.
NASA Astrophysics Data System (ADS)
Schmidt, F.
1980-11-01
The components of a superconducting 110 kV ac cable for power ratings or = 2000 MVA were developed. The cable design is of the semiflexible type, with a rigid cryogenic envelope containing a flexible hollow coaxial cable core. The cable core consists of spirally wound Nb-A1 composite wires electrically insulated by high pressure polyethylene tape wrappings. A 35 m long single phase test cable with full load terminals rated at 110 kV and 10 kA was constructed and successfully tested. The results obtained prove the technical feasibility and capability of this cable design.
30 CFR 585.658 - Can my cable or pipeline construction deviate from my approved COP or GAP?
Code of Federal Regulations, 2012 CFR
2012-07-01
... from my approved COP or GAP? 585.658 Section 585.658 Mineral Resources BUREAU OF OCEAN ENERGY... Can my cable or pipeline construction deviate from my approved COP or GAP? (a) You must make every... COP or GAP. (c) If, after construction, it is determined that a deviation from the approved plan has...
30 CFR 585.658 - Can my cable or pipeline construction deviate from my approved COP or GAP?
Code of Federal Regulations, 2014 CFR
2014-07-01
... from my approved COP or GAP? 585.658 Section 585.658 Mineral Resources BUREAU OF OCEAN ENERGY... Can my cable or pipeline construction deviate from my approved COP or GAP? (a) You must make every... COP or GAP. (c) If, after construction, it is determined that a deviation from the approved plan has...
30 CFR 585.658 - Can my cable or pipeline construction deviate from my approved COP or GAP?
Code of Federal Regulations, 2013 CFR
2013-07-01
... from my approved COP or GAP? 585.658 Section 585.658 Mineral Resources BUREAU OF OCEAN ENERGY... Can my cable or pipeline construction deviate from my approved COP or GAP? (a) You must make every... COP or GAP. (c) If, after construction, it is determined that a deviation from the approved plan has...
Thakur, Nikhil A; Crisco, Joseph J; Moore, Douglas C; Froehlich, John A; Limbird, Richard S; Bliss, James M
2010-02-01
This study proposes a novel method for reattachment of the trochanteric slide osteotomy. The strength of this new fixation system was compared to established configurations. Fifteen sawbone femurs were used. Our configuration used cables above and below the lesser trochanter with a third cable around the shaft of the femur while passing the loose ends through the inferior hole of the cable grip. Displacement of the trochanter was measured with increasing load. Force required for catastrophic failure was also measured. The 3-cable construct resulted in significantly less displacement with increasing load and required a larger force to cause failure (1 cm and 2 cm). We theorize that our configuration produces a biomechanically stronger construct than previously used methods. 2010 Elsevier Inc. All rights reserved.
Thakur, Nikhil A.; Crisco, Joseph J.; Moore, Douglas C.; Froehlich, John A.; Limbird, Richard S.; Bliss, James M.
2017-01-01
This study proposes a novel method for reattachment of the trochanteric slide osteotomy. The strength of this new fixation system was compared to established configurations. Fifteen sawbone femurs were used. Our configuration used cables above and below the lesser trochanter with a third cable around the shaft of the femur while passing the loose ends through the inferior hole of the cable grip. Displacement of the trochanter was measured with increasing load. Force required for catastrophic failure was also measured. The 3-cable construct resulted in significantly less displacement with increasing load and required a larger force to cause failure (1 cm and 2 cm). We theorize that our configuration produces a biomechanically stronger construct than previously used methods. PMID:19062247
Anthropometric assessment of crane cabins and recommendations for design: A case study.
Zunjic, Aleksandar; Brkic, Vesna Spasojevic; Klarin, Milivoj; Brkic, Aleksandar; Krstic, Dragan
2015-01-01
Work of crane operators is very difficult and demanding. Therefore, it is very important that the cabin of a crane be designed on the basis of relevant anthropometric data. However, it is very difficult to find a research that considers anthropometric convenience of crane cabins. From the theoretical viewpoint, it is important to perceive and to classify effects of the anthropometric incompatibility of crane cabins. Globally, the objective is to consider the anthropometric convenience of existing crane cabins, and possibilities for improvements of their design from the ergonomic point of view. In this regard, it is significant to detect constraints that impede or hinder the work of the crane operators, which could be overcome with certain anthropometric solutions. The main objective is to examine whether and to what extent is justifiable to use anthropometric data that are obtained on the basis of general (national) population, during designing the crane cabins. For the assessment of existing crane cabins and the work of operators, four methods were used: observation of the work of the operators and design solutions of the cabins, the checklist approach, interviewing of operators and the experimental research based on obtaining the data on the population of crane operators. Results of the analysis based on the method of observation, analysis based on the application of the checklist, as well as interviewing of the operators indicate that certain construction constraints of the components in the cabins are the main reasons of reduced visibility and improper working postures of operators. All this has caused the emergence of continuous musculoskeletal loading of the crane operators. The results of the anthropometric research that were obtained on the population of crane operators in this case study suggest that there is a statistically significant difference, when compared data of this population of workers with anthropometric data from the general population. Analyzed workplaces in crane cabins do not correspond to the majority of operators from the anthropometric standpoint. The conducted anthropometric analysis has been indicated that could be made the mistake, if dimensions of the cabin and layout of equipment would be relied on data derived from the general population of citizens. In order to achieve greater precision in the design and configuration of equipment, it is recommended using the data that are obtained directly on the population of the crane operators when designing the cabin.
Rabalais, R David; Burger, Evalina; Lu, Yun; Mansour, Alfred; Baratta, Richard V
2008-02-01
This study compared the biomechanical properties of 2 tension-band techniques with stainless steel wire and ultra high molecular weight polyethylene (UHMWPE) cable in a patella fracture model. Transverse patella fractures were simulated in 8 cadaver knees and fixated with figure-of-8 and parallel wire configurations in combination with Kirschner wires. Identical configurations were tested with UHMWPE cable. Specimens were mounted to a testing apparatus and the quadriceps was used to extend the knees from 90 degrees to 0 degrees; 4 knees were tested under monotonic loading, and 4 knees were tested under cyclic loading. Under monotonic loading, average fracture gap was 0.50 and 0.57 mm for steel wire and UHMWPE cable, respectively, in the figure-of-8 construct compared with 0.16 and 0.04 mm, respectively, in the parallel wire construct. Under cyclic loading, average fracture gap was 1.45 and 1.66 mm for steel wire and UHMWPE cable, respectively, in the figure-of-8 construct compared with 0.45 and 0.60 mm, respectively, in the parallel wire construct. A statistically significant effect of technique was found, with the parallel wire construct performing better than the figure-of-8 construct in both loading models. There was no effect of material or interaction. In this biomechanical model, parallel wires performed better than the figure-of-8 configuration in both loading regimens, and UHMWPE cable performed similarly to 18-gauge steel wire.
1962-10-26
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 26, 1962, depicts a view of the Block House tunnel opening.
1962-08-17
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken August 17, 1962 depicts a back side view of the Block House.
1962-11-15
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken November 15, 1962, depicts a view of the Block House.
1962-06-13
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. Construction of the tunnel is depicted in this photo taken June 13, 1962.
The National Shipbuilding Research Program, 1990 Ship Production Symposium
1990-08-01
deck, sides and bottom Shear stresses which may be important for certain classes of vessels, are not accounted for in this study. The net sectional...and the superstructure. The highly pre-outfitted blocks then can be transferred to the dry dock by a gantry crane . After integrating the blocks into...manager. 2A-2-3 Examples of cost centres are: Plate Production Unit Pre-outfitting Hull Construction Ship Outfitting (Weapons Compartments) Berth Cranes
Belaire, J Amy; Kreakie, Betty J; Keitt, Timothy; Minor, Emily
2014-04-01
Migratory stopover habitats are often not part of planning for conservation or new development projects. We identified potential stopover habitats within an avian migratory flyway and demonstrated how this information can guide the site-selection process for new development. We used the random forests modeling approach to map the distribution of predicted stopover habitat for the Whooping Crane (Grus americana), an endangered species whose migratory flyway overlaps with an area where wind energy development is expected to become increasingly important. We then used this information to identify areas for potential wind power development in a U.S. state within the flyway (Nebraska) that minimize conflicts between Whooping Crane stopover habitat and the development of clean, renewable energy sources. Up to 54% of our study area was predicted to be unsuitable as Whooping Crane stopover habitat and could be considered relatively low risk for conflicts between Whooping Cranes and wind energy development. We suggest that this type of analysis be incorporated into the habitat conservation planning process in areas where incidental take permits are being considered for Whooping Cranes or other species of concern. Field surveys should always be conducted prior to construction to verify model predictions and understand baseline conditions. © 2013 Society for Conservation Biology.
2011-06-27
CAPE CANAVERAL, Fla. -- At Astrotech's Hazardous Processing Facility in Titusville, Fla., technicians prepare cable for an overhead crane to lift the cover from NASA's Juno spacecraft before its move to a fueling stand where the spacecraft will be loaded with the propellant necessary for orbit maneuvers and the attitude control system. Juno is scheduled to launch aboard a United Launch Alliance Atlas V rocket from Cape Canaveral, Fla., Aug. 5.The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. For more information visit: www.nasa.gov/juno. Photo credit: NASA/Troy Cryder
1998-11-06
Still suspended by a crane and cables in the Space Station Processing Facility, yet hidden by the top of the Z1 integrated truss structure, the Passive Common Berthing Mechanism (PCBM) is lowered onto the truss for attachment. Workers at the top of a workstand guide it into place. A component of the International Space Station (ISS), the Z1 truss will be used for the temporary installation of the P6 truss segment to the Unity connecting module. The P6 truss segment contains the solar arrays and batteries which will provide early station power. The truss is scheduled to be launched aboard STS-92 in late 1999
Europa Lander Mission Concept (Artist Rendering)
2017-02-08
This artist's rendering illustrates a conceptual design for a potential future mission to land a robotic probe on the surface of Jupiter's moon Europa. The lander is shown with a sampling arm extended, having previously excavated a small area on the surface. The circular dish on top is a dual-purpose high-gain antenna and camera mast, with stereo imaging cameras mounted on the back of the antenna. Three vertical shapes located around the top center of the lander are attachment points for cables that would lower the rover from a sky crane, which is envisioned as the landing system for this mission concept. http://photojournal.jpl.nasa.gov/catalog/PIA21048
78 FR 23837 - Cranes and Derricks in Construction: Underground Construction and Demolition
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
... report here the results for the entire heavy-and-civil engineering sector and the entire site... in this final rule because employers included in the heavy-and-civil engineering sector, or the site... final rule. This final rule affects two construction sectors: NAICS 237990 (Other Heavy and Civil...
29 CFR 1926.858 - Removal of steel construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of steel construction. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing. (b) Cranes, derricks... 29 Labor 8 2011-07-01 2011-07-01 false Removal of steel construction. 1926.858 Section 1926.858...
29 CFR 1926.858 - Removal of steel construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of steel construction. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing. (b) Cranes, derricks... 29 Labor 8 2010-07-01 2010-07-01 false Removal of steel construction. 1926.858 Section 1926.858...
29 CFR 1926.858 - Removal of steel construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Removal of steel construction. 1926.858 Section 1926.858... of steel construction. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing. (b) Cranes, derricks...
29 CFR 1926.858 - Removal of steel construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Removal of steel construction. 1926.858 Section 1926.858... of steel construction. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing. (b) Cranes, derricks...
29 CFR 1926.858 - Removal of steel construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Removal of steel construction. 1926.858 Section 1926.858... of steel construction. (a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing. (b) Cranes, derricks...
77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...
Lapsiwala, Samir B; Anderson, Paul A; Oza, Ashish; Resnick, Daniel K
2006-03-01
We performed a biomechanical comparison of several C1 to C2 fixation techniques including crossed laminar (intralaminar) screw fixation, anterior C1 to C2 transarticular screw fixation, C1 to 2 pedicle screw fixation, and posterior C1 to C2 transarticular screw fixation. Eight cadaveric cervical spines were tested intact and after dens fracture. Four different C1 to C2 screw fixation techniques were tested. Posterior transarticular and pedicle screw constructs were tested twice, once with supplemental sublaminar cables and once without cables. The specimens were tested in three modes of loading: flexion-extension, lateral bending, and axial rotation. All tests were performed in load and torque control. Pure bending moments of 2 nm were applied in flexion-extension and lateral bending, whereas a 1 nm moment was applied in axial rotation. Linear displacements were recorded from extensometers rigidly affixed to the C1 and C2 vertebrae. Linear displacements were reduced to angular displacements using trigonometry. Adding cable fixation results in a stiffer construct for posterior transarticular screws. The addition of cables did not affect the stiffness of C1 to C2 pedicle screw constructs. There were no significant differences in stiffness between anterior and posterior transarticular screw techniques, unless cable fixation was added to the posterior construct. All three posterior screw constructs with supplemental cable fixation provide equal stiffness with regard to flexion-extension and axial rotation. C1 lateral mass-C2 intralaminar screw fixation restored resistance to lateral bending but not to the same degree as the other screw fixation techniques. All four screw fixation techniques limit motion at the C1 to 2 articulation. The addition of cable fixation improves resistance to flexion and extension for posterior transarticular screw fixation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... constitute an integral part of a circuit for transmitting electrical energy. (d) Cable reels for shuttle cars... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.45 Cable reels. (a) A self-propelled machine, that receives electrical energy through a portable...
Code of Federal Regulations, 2013 CFR
2013-07-01
... constitute an integral part of a circuit for transmitting electrical energy. (d) Cable reels for shuttle cars... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.45 Cable reels. (a) A self-propelled machine, that receives electrical energy through a portable...
Code of Federal Regulations, 2012 CFR
2012-07-01
... constitute an integral part of a circuit for transmitting electrical energy. (d) Cable reels for shuttle cars... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.45 Cable reels. (a) A self-propelled machine, that receives electrical energy through a portable...
Code of Federal Regulations, 2010 CFR
2010-07-01
... constitute an integral part of a circuit for transmitting electrical energy. (d) Cable reels for shuttle cars... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.45 Cable reels. (a) A self-propelled machine, that receives electrical energy through a portable...
Code of Federal Regulations, 2011 CFR
2011-07-01
... constitute an integral part of a circuit for transmitting electrical energy. (d) Cable reels for shuttle cars... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.45 Cable reels. (a) A self-propelled machine, that receives electrical energy through a portable...
Selected Economic Translations on Eastern Europe (201st in the series)
1960-08-08
appropriate cranes . The rational course of the transportation process is to be achieved by box cars in accordance with the kind and cate- gory of goods5 the...exploitation of local reserves. The Automobile Manu- facturing VEB must extend the manufacture of special rigs and must ensure the supply of loading cranes ...products, however, was too limited to withstand the stresses in the production of construction materials. Similarly favorable is..the foaming reaction of
Wolfla, Christopher E; Salerno, Simon A; Yoganandan, Narayan; Pintar, Frank A
2007-09-01
This study was designed to test the kinematic properties of three occiput-C2 instrumentation constructs with and without supplemental rigid C1 fixation. The results are compared with intact specimens and with constructs incorporating contemporary cabling techniques. Five unembalmed human cadaver specimens underwent range of motion (ROM) testing in the intact condition, followed by destabilization with odontoid osteotomy. Destabilized specimens then underwent ROM testing with each of seven occipitocervical instrumentation constructs, all incorporating occipital screws: C1 and C2 sublaminar cables with cable connectors, C2 pars screws +/- C1 lateral mass screws, C2 lamina screws +/- C1 lateral mass screws, and C1-C2 transarticular screws +/- C1 lateral mass screws. All seven constructs demonstrated significantly lower ROM in all loading modes than intact specimens (P < 0.05). With a single exception, the addition of C1 lateral mass screws to the screw-based constructs produced no significant change in ROM in any of the loading modes. Compared with intact specimens, constructs anchored by C1-C2 transarticular screws demonstrated the greatest decrease in ROM, and those anchored by sublaminar cables demonstrated the least decrease in ROM. Any of the tested screw-based constructs are likely to provide adequate support for the patient with an unstable craniocervical junction. Therefore, the choice of construct should be based on anatomic considerations. The routine incorporation of C1 lateral mass screws into occipitocervical instrumentation constructs does not seem necessary.
29 CFR 1926.1442 - Severability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Severability. 1926.1442 Section 1926.1442 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1442...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Training. 1926.1430 Section 1926.1430 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1430 Training...
Lewis, Gregory S; Caroom, Cyrus T; Wee, Hwabok; Jurgensmeier, Darin; Rothermel, Shane D; Bramer, Michelle A; Reid, John Spence
2015-10-01
The biomechanical difficulty in fixation of a Vancouver B1 periprosthetic fracture is purchase of the proximal femoral segment in the presence of the hip stem. Several newer technologies provide the ability to place bicortical locking screws tangential to the hip stem with much longer lengths of screw purchase compared with unicortical screws. This biomechanical study compares the stability of 2 of these newer constructs to previous methods. Thirty composite synthetic femurs were prepared with cemented hip stems. The distal femur segment was osteotomized, and plates were fixed proximally with either (1) cerclage cables, (2) locked unicortical screws, (3) a composite of locked screws and cables, or tangentially directed bicortical locking screws using either (4) a stainless steel locking compression plate system with a Locking Attachment Plate (Synthes) or (5) a titanium alloy Non-Contact Bridging system (Zimmer). Specimens were tested to failure in either axial or torsional quasistatic loading modes (n = 3) after 20 moderate load preconditioning cycles. Stiffness, maximum force, and failure mechanism were determined. Bicortical constructs resisted higher (by an average of at least 27%) maximum forces than the other 3 constructs in torsional loading (P < 0.05). Cables constructs exhibited lower maximum force than all other constructs, in both axial and torsional loading. The bicortical titanium construct was stiffer than the bicortical stainless steel construct in axial loading. Proximal fixation stability is likely improved with the use of bicortical locking screws as compared with traditional unicortical screws and cable techniques. In this study with a limited sample size, we found the addition of cerclage cables to unicortical screws may not offer much improvement in biomechanical stability of unstable B1 fractures.
Lewis, Gregory S.; Caroom, Cyrus T.; Wee, Hwabok; Jurgensmeier, Darin; Rothermel, Shane D.; Bramer, Michelle A.; Reid, J. Spence
2015-01-01
Objectives The biomechanical difficulty in fixation of a Vancouver B1 periprosthetic fracture is purchase of the proximal femoral segment in the presence of the hip stem. Several newer technologies provide the ability to place bicortical locking screws tangential to the hip stem with much longer lengths of screw purchase compared to unicortical screws. This biomechanical study compares the stability of two of these newer constructs to previous methods. Methods Thirty composite synthetic femurs were prepared with cemented hip stems. The distal femur segment was osteotomized, and plates were fixed proximally with either: (1) cerclage cables; (2) locked unicortical screws; (3) a composite of locked screws and cables; or tangentially directed bicortical locking screws using either (4) a stainless steel LCP system with a Locking Attachment Plate (Synthes), or (5) a titanium alloy NCB system (Zimmer). Specimens were tested to failure in either axial or torsional quasi-static loading modes (n = 3) after 20 moderate load pre-conditioning cycles. Stiffness, maximum force, and failure mechanism were determined. Results Bicortical constructs resisted higher (by an average of at least 27%) maximum forces than the other three constructs in torsional loading (p<0.05). Cables constructs exhibited lower maximum force than all other constructs, in both axial and torsional loading. The bicortical titanium construct was stiffer than the bicortical stainless steel construct in axial loading. Conclusions Proximal fixation stability is likely improved with the use of bicortical locking screws as compared to traditional unicortical screws and cable techniques. In this study with a limited sample size, we found the addition of cerclage cables to unicortical screws may not offer much improvement in biomechanical stability of unstable B1 fractures. PMID:26053467
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
This curriculum outline, instructor's guide, and student's guide for a secondary-postsecondary-level course in construction electrician/power and communications cable splicing are one of a number of military-developed curriculum packages developed for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose…
DOT National Transportation Integrated Search
1991-01-01
During the construction of the I-295 cable-stayed bridge, an extensive array of mechanical strain gage points were installed in sections of the box girders, pylons, and piers. At each instrumented box girder section, five longitudinal gages were plac...
NASA Astrophysics Data System (ADS)
Chen, Yongrui; Wei, Wei; Dai, Jie
2017-04-01
Main cable is one of the most important structure of suspension Bridges, which bear all the dead and live load from upper structure. Cable erection is one of the most critical process in suspension bridge construction. Key points about strand erection are studied in this paper, including strand traction, lateral movement, section adjustment, placing into saddle, anchoring, line shape adjustment and keeping, and tension control. The technology has helped a long-span suspension bridge in Yunnan Province, China get a ideal finished state.
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
46 CFR 111.12-9 - Generator cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity...
Cable Television in Detroit; A Study in Urban Communications.
ERIC Educational Resources Information Center
Detroit Cable T. V. Study Committee, MI.
The Cable TV Study Committee of the Common Council of Detroit, Michigan studied in depth the possibilities, requirements, and implications of cable television for Detroit. Their detailed recommendations are presented, covering financing and construction, the need for engineering and financial projections, organization for operation, channel…
29 CFR 1926.1434 - Equipment modifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Equipment modifications. 1926.1434 Section 1926.1434 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1434...
29 CFR 1926.1406 - Assembly/Disassembly-employer procedures-general requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Assembly/Disassembly-employer procedures-general... CONSTRUCTION Cranes and Derricks in Construction § 1926.1406 Assembly/Disassembly—employer procedures—general requirements. (a) When using employer procedures instead of manufacturer procedures for assembly/disassembly...
29 CFR 1926.1406 - Assembly/Disassembly-employer procedures-general requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Assembly/Disassembly-employer procedures-general... CONSTRUCTION Cranes and Derricks in Construction § 1926.1406 Assembly/Disassembly—employer procedures—general requirements. (a) When using employer procedures instead of manufacturer procedures for assembly/disassembly...
29 CFR 1926.1406 - Assembly/Disassembly-employer procedures-general requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Assembly/Disassembly-employer procedures-general... CONSTRUCTION Cranes and Derricks in Construction § 1926.1406 Assembly/Disassembly—employer procedures—general requirements. (a) When using employer procedures instead of manufacturer procedures for assembly/disassembly...
29 CFR 1926.1406 - Assembly/Disassembly-employer procedures-general requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Assembly/Disassembly-employer procedures-general... CONSTRUCTION Cranes and Derricks in Construction § 1926.1406 Assembly/Disassembly—employer procedures—general requirements. (a) When using employer procedures instead of manufacturer procedures for assembly/disassembly...
Long term monitoring of carbon composite strands in the Penobscot-Narrows bridge.
DOT National Transportation Integrated Search
2015-06-01
The Penobscot-Narrows Bridge was constructed between May 2003 and December 2006. The bridge is a cable-stayed design with twin pylons and a 2,120-foot span. This cable-stayed bridge features a cradle stay system that : allows for each cable strand in...
1962-10-08
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 8, 1962, depicts a front view of the Block House nearing completion.
1962-01-23
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken January 23, 1962, shows the excavation of the Block House site.
1962-02-02
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken February 2, 1962, shows the excavation of the Block House site.
Flat conductor cable commercialization project
NASA Technical Reports Server (NTRS)
Hogarth, P.; Wadsworth, E.
1977-01-01
An undercarpet flat conductor cable and a baseboard flat conductor cable system were studied for commercialization. The undercarpet system is designed for use in office and commercial buildings. It employs a flat power cable, protected by a grounded metal shield, that terminates in receptacles mounted on the floor. It is designed to interface with a flat conductor cable telephone system. The baseboard system consists of a flat power cable mounted in a plastic raceway; both the raceway and the receptacles are mounted on the surface of the baseboard. It is designed primarily for use in residential buildings, particularly for renovation and concrete and masonry construction.
Uses for lunar crawler transporters
NASA Astrophysics Data System (ADS)
Kaden, Richard A.
This article discusses state-of-the-art crawler transporters and expresses the need for additional research and development for lunar crawlers. The thrust of the paper illustrates how the basic crawler technology has progressed to a point where extremely large modules can be shop fabricated and move to some distant location at a considerable savings. Also, extremely heavy loads may be lifted by large crawler cranes and placed in designed locations. The Transi-Lift Crawler crane with its traveling counterweight is an attractive concept for lunar construction.
Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring
NASA Astrophysics Data System (ADS)
Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.
2016-06-01
Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera approach has the potential to reach the same accuracy level.
29 CFR 1926.1439 - Dedicated pile drivers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Dedicated pile drivers. 1926.1439 Section 1926.1439 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1439...
193. Photographic copy of original construction drawing dated October 31, ...
193. Photographic copy of original construction drawing dated October 31, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; GATE CHAMBER; UNDERHUNG CRANE AND HOIST-HAND OPERATED. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR
Systems engineering studies of lunar base construction
NASA Technical Reports Server (NTRS)
Morgenthaler, George W.
1991-01-01
Many ingenious concepts have been proposed for lunar base construction, but few systematic studies exist which relate time-consistent lunar base construction technologies and the choice of lunar base approach with the long-term SEI objectives - i.e., lunar indigenous base construction and Mars Exploration equipment development. To fill this gap, CSC has taken a two-pronged approach. First, the Center undertook basic geotechnical investigations of lunar soil, fabrication of a scale prototype of a lunar construction crane, a multi-robot construction team laboratory experiment, and a preliminary design of lunar base structures. Second, during Jun. and Jul. 1991 two lunar base construction systems engineering studies were accomplished - a 'near term lunar base' study, and a 'far-term lunar base' study. The goals of these studies were to define the major lunar base construction research problems in consistent technology/construction frameworks, and to define design requirements for construction equipment such as a lunar crane and a regolith mover. The 'near-term lunar base' study examined three different construction concepts for a lunar base comprised of pre-fabricated, pre-tested, Space Station Freedom-type modules, which would be covered with regolith shielding. Concept A used a lunar crane for unloading and transportation; concept B, a winch and cart; and concept C, a walker to move the modules from the landing site to the base site and assemble them. To evaluate the merits of each approach, calculations were made of mass efficiency measure, source mass, reliability, far-term base mass, Mars base mass, and base assembly time. The model thus established was also used to define the requirements for crane speed and regolith mover m(sup 3)/sec rates. A major problem addressed is how to 'mine' the regolith and stack it over the habitats as shielding. To identify when the cost of using indigenous lunar materials to construct the base exceeds the cost of development and delivery of the equipment for processing lunar materials, a study of construction of a candidate sintered regolith 'far term lunar base' was undertaken. A technique was devised for casting slabs of sintered (basaltic) regolith and assembling these into a hemispherical (or geodesic) dome. The major problem occurs with the inner liner. At 14.7 psi and 20 percent oxygen internal atmosphere, the entire structure is in tension, even with the regolith load. Also, another study has indicated that at 14.7 psi major resupply of air will be needed because of leakage, and astronauts may have to engage in extensive pre-breathing and post-breathing for extravehicular activity (EVA) tasks, thus detracting from useful mission work time. An alternative is to operate part of the base at, say, 5 psi and 70 percent oxygen, or to equip the astronauts with hard suits at 8.3 psi or greater. All of these choices directly influence base design and construction techniques.
The manufacture of flat conductor cable
NASA Technical Reports Server (NTRS)
Angele, W.
1974-01-01
The major techniques are described for fabricating flat conductor cable (FCC). Various types of FCC, including unshielded, shielded, power, and signal, in both existing and conceptual constructions, are covered.
47 CFR 32.2423 - Buried cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2423 Buried cable. (a... of cleaning manholes and ducts in connection with construction work and the cost of permits and...
Dendrometer bands made easy: using modified cable ties to measure incremental growth of trees
Anemaet, Evelyn R.; Middleton, Beth A.
2013-01-01
Dendrometer bands are a useful way to make sequential repeated measurements of tree growth, but traditional dendrometer bands can be expensive, time consuming, and difficult to construct in the field. An alternative to the traditional method of band construction is to adapt commercially available materials. This paper describes how to construct and install dendrometer bands using smooth-edged, stainless steel, cable tie banding and attachable rollerball heads. As a performance comparison, both traditional and cable tie dendrometer bands were installed on baldcypress trees at the National Wetlands Research Center in Lafayette, Louisiana, by both an experienced and a novice worker. Band installation times were recorded, and growth of the trees as estimated by the two band types was measured after approximately one year, demonstrating equivalence of the two methods. This efficient approach to dendrometer band construction can help advance the knowledge of long-term tree growth in ecological studies.
Comparison of alternative designs for reducing complex neurons to equivalent cables.
Burke, R E
2000-01-01
Reduction of the morphological complexity of actual neurons into accurate, computationally efficient surrogate models is an important problem in computational neuroscience. The present work explores the use of two morphoelectrotonic transformations, somatofugal voltage attenuation (AT cables) and signal propagation delay (DL cables), as bases for construction of electrotonically equivalent cable models of neurons. In theory, the AT and DL cables should provide more accurate lumping of membrane regions that have the same transmembrane potential than the familiar equivalent cables that are based only on somatofugal electrotonic distance (LM cables). In practice, AT and DL cables indeed provided more accurate simulations of the somatic transient responses produced by fully branched neuron models than LM cables. This was the case in the presence of a somatic shunt as well as when membrane resistivity was uniform.
Fixation systems of greater trochanteric osteotomies: biomechanical and clinical outcomes.
Jarit, Gregg J; Sathappan, Sathappan S; Panchal, Anand; Strauss, Eric; Di Cesare, Paul E
2007-10-01
The development of cerclage systems for fixation of greater trochanteric osteotomies has progressed from monofilament wires to multifilament cables to cable grip and cable plate systems. Cerclage wires and cables have various clinical indications, including fixation for fractures and for trochanteric osteotomy in hip arthroplasty. To achieve stable fixation and eventual union of the trochanteric osteotomy, the implant must counteract the destabilizing forces associated with pull of the peritrochanteric musculature. The material properties of cables and cable grip systems are superior to those of monofilament wires; however, potential complications with the use of cables include debris generation and third-body polyethylene wear. Nevertheless, the cable grip system provides the strongest fixation and results in lower rates of nonunion and trochanteric migration. Cable plate constructs show promise but require further clinical studies to validate their efficacy and safety.
29 CFR 1926.1403 - Assembly/Disassembly-selection of manufacturer or employer procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Assembly/Disassembly-selection of manufacturer or employer... CONSTRUCTION Cranes and Derricks in Construction § 1926.1403 Assembly/Disassembly—selection of manufacturer or... applicable to assembly and disassembly, or (b) Employer procedures for assembly and disassembly. Employer...
29 CFR 1926.1403 - Assembly/Disassembly-selection of manufacturer or employer procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Assembly/Disassembly-selection of manufacturer or employer... CONSTRUCTION Cranes and Derricks in Construction § 1926.1403 Assembly/Disassembly—selection of manufacturer or... applicable to assembly and disassembly, or (b) Employer procedures for assembly and disassembly. Employer...
29 CFR 1926.1403 - Assembly/Disassembly-selection of manufacturer or employer procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Assembly/Disassembly-selection of manufacturer or employer... CONSTRUCTION Cranes and Derricks in Construction § 1926.1403 Assembly/Disassembly—selection of manufacturer or... applicable to assembly and disassembly, or (b) Employer procedures for assembly and disassembly. Employer...
29 CFR 1926.1403 - Assembly/Disassembly-selection of manufacturer or employer procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Assembly/Disassembly-selection of manufacturer or employer... CONSTRUCTION Cranes and Derricks in Construction § 1926.1403 Assembly/Disassembly—selection of manufacturer or... applicable to assembly and disassembly, or (b) Employer procedures for assembly and disassembly. Employer...
29 CFR 1926.1420 - Signals-radio, telephone or other electronic transmission of signals.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Signals-radio, telephone or other electronic transmission of signals. 1926.1420 Section 1926.1420 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL... CONSTRUCTION Cranes and Derricks in Construction § 1926.1420 Signals—radio, telephone or other electronic...
29 CFR 1926.1420 - Signals-radio, telephone or other electronic transmission of signals.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Signals-radio, telephone or other electronic transmission of signals. 1926.1420 Section 1926.1420 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL... CONSTRUCTION Cranes and Derricks in Construction § 1926.1420 Signals—radio, telephone or other electronic...
Fast Pulses in a Coaxial Cable.
ERIC Educational Resources Information Center
Gray, Levi
1985-01-01
Describes an experiment designed to introduce physics majors to the triggered oscilloscope. The experiment uses an inexpensive, easily constructed generator which sends pulses down a long coaxial cable, thus providing useful waveforms. (DH)
Space Shuttle Enterprise Demate
2012-05-12
A set of cranes and wind restraints constructed to remove space shuttle Enterprise from atop NASA's 747 Shuttle Carrier Aircraft are being put into place at John F. Kennedy (JFK) International Airport in New York, Saturday, May 12, 2012. Enterprise will be placed on a barge that will move by tugboat up the Hudson River to Intrepid in June. The shuttle will be lifted by crane and placed on the flight deck of the Intrepid, where it will be on exhibit to the public starting this summer in a temporary climate-controlled pavilion. Photo Credit: (NASA/Kim Shiflet)
Lorenz, Sonja; Deng, Patricia; Hantschel, Oliver; Superti-Furga, Giulio; Kuriyan, John
2018-01-01
Constitutive activation of the non-receptor tyrosine kinase c-Abl (Abl1) in the Bcr-Abl1 fusion oncoprotein is the molecular cause of chronic myeloid leukemia. Recent studies have indicated that an interaction between the SH2 domain and the N-lobe of the c-Abl kinase domain has a critical role in leukemogenesis. To dissect the structural basis of this phenomenon we studied c-Abl constructs comprising the SH2 and kinase domains in vitro. We present a crystal structure of an SH2-kinase domain construct bound to dasatinib, which contains the relevant interface between the SH2 domain and the N-lobe of the kinase domain. We show that the presence of the SH2 domain enhances kinase activity moderately and that this effect depends on contacts in the SH2-N-lobe interface and is abrogated by specific mutations. Consistently, formation of the interface decreases slightly the association rate of imatinib with the kinase domain. That the effects are small compared to the dramatic in vivo consequences suggests an important function of the SH2-N-lobe interaction might be to help disassemble the autoinhibited conformation of c-Abl and promote processive phosphorylation, rather than substantially stimulate kinase activity. PMID:25779001
Research on Swivel Construction Technology of 22,400 Tons in Zoucheng Thirty Meter Bridge
NASA Astrophysics Data System (ADS)
Han, Jun; Benlin, Xiao
2018-05-01
In recent years, with the rapid development of highways and railways in our country, there have been many new bridges that need to cross the existing routes. If the conventional construction methods are used, the existing traffic will be affected and the traffic will be built above the busy traffic lines, so there is a big security risk, the construction methods must be improved and innovated. In this paper, it intends to research and develop some key technologies of swivel construction. According to the construction features to use finite element method of swivel cable-stayed bridge to analyse the cable-stayed bridge . The swivel construction process is carried out to solve the technical problems and difficulties in the construction.
Partial feedback linearization control for 3-D underactuated overhead crane systems.
Wu, Xianqing; He, Xiongxiong
2016-11-01
In this paper, a novel anti-swing control method is proposed for 3-dimensional (3-D) underactuated overhead crane systems, which guarantees fast transportation and efficient swing suppression. Specifically, to increase the performance of the payload swing suppression, a swing-suppressing element is introduced, based on which a novel positioning error signal is constructed. Then, a new control method is developed, and the overall system is divided into two subsystems. The stability analysis of the two subsystems and the overall system is given. In addition, the convergence of the system states is proved. Simulation results are provided to demonstrate the superior performance of the proposed controller over the existing controllers. Meanwhile, the practical performance of the proposed controller is experimentally validated on a portable overhead crane test-bed. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.
32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End ...
32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Center and east pier, with framing, during construction, 1925-27. Makes panorama with next photo. Note steam crane on framing. Credit: Shenks Photography, Columbus, MS, owner. O. Pruitt, photographer. Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS
Shah, S; Kim, S Y R; Dubov, A; Schemitsch, E H; Bougherara, H; Zdero, R
2011-09-01
Femoral shaft fractures after total hip arthroplasty (THA) remain a serious problem, since there is no optimal surgical repair method. Virtually all studies that examined surgical repair methods have done so clinically or experimentally. The present study assessed injury patterns computationally by developing three-dimensional (3D) finite element (FE) models that were validated experimentally. The investigation evaluated three different constructs for the fixation of Vancouver B1 periprosthetic femoral shaft fractures following THA. Experimentally, three bone plate repair methods were applied to a synthetic femur with a 5 mm fracture gap near the tip of a total hip implant. Repair methods were identical distal to the fracture gap, but used cables only (construct A), screws only (construct B), or cables plus screws (construct C) proximal to the fracture gap. Specimens were oriented in 15 degrees adduction to simulate the single-legged stance phase of walking, subjected to 1000 N of axial force, and instrumented with strain gauges. Computationally, a linearly elastic and isotropic 3D FE model was developed to mimic experiments. Results showed excellent agreement between experimental and FE strains, yielding a Pearson linearity coefficient, R2, of 0.92 and a slope for the line of best data fit of 1.06. FE-computed axial stiffnesses were 768 N/mm (construct A), 1023 N/mm (construct B), and 1102 N/mm (construct C). FE surfaces stress maps for cortical bone showed Von Mises stresses, excluding peaks, of 0-8 MPa (construct A), 0-15 MPa (construct B), and 0-20 MPa (construct C). Cables absorbed the majority of load, followed by the plates and then the screws. Construct A yielded peak stress at one of the empty holes in the plate. Constructs B and C had similar bone stress patterns, and can achieve optimal fixation.
Modified van Vaals-Bergman coaxial cable coil (lambda coil) for high-field imaging.
Matsuzawa, H; Nakada, T
1996-03-01
An easily constructed, low-capacitive coupling volume coil based on the van Vaals-Bergman coaxial cable coil for high field imaging is described. The coil (designated "lambda coil") was constructed using two 5/4 length 50 omega coaxial cables matched to a 50 omega transmission line with LC bridge balun. The standing wave on the single 5/4 lambda length coaxial cable provides two points of current maxima in oppositional direction. Therefore, the four current elements necessary for effective B1 field generation can be obtained by two 5/4 lambda length coaxial cables arranged analogous to 1/2 lambda T-antenna. Capacitive coupling between the coil elements and conductive samples (i.e. animals) is minimized by simply retaining the shield of the coaxial cable for the area of voltage maxima. The lambda coil exhibited excellent performance as a volume coil with a high quality factor and highly homogeneous rf fields. Because of its dramatically simple architecture and excellent performance, the lambda coil configuration appears to be an economical alternative to the original van Vaals-Bergman design, especially for research facilities with a high field magnet and limited bore space.
Armored spring-core superconducting cable and method of construction
McIntyre, Peter M.; Soika, Rainer H.
2002-01-01
An armored spring-core superconducting cable (12) is provided. The armored spring-core superconducting cable (12) may include a spring-core (20), at least one superconducting strand (24) wound onto the spring-core (20), and an armored shell (22) that encases the superconducting strands (24). The spring-core (20) is generally a perforated tube that allows purge gases and cryogenic liquids to be circulated through the armored superconducting cable (12), as well as managing the internal stresses within the armored spring-core superconducting cable (12). The armored shell (22) manages the external stresses of the armored spring-core superconducting cable (12) to protect the fragile superconducting strands (24). The armored spring-core superconducting cable (12) may also include a conductive jacket (34) formed outwardly of the armored shell (22).
Urban construction and safety project
NASA Technical Reports Server (NTRS)
Hogarth, P. T.
1976-01-01
Technology utilization projects in the area of urban construction and safety included the following: development of undercarpet and baseboard flat conductor cables, flood insurance studies, tornado safety engineering, the Project TECH house at the Langley Research Center, assistance to the City of Atlanta in their environmental habitability and resource allocation program, and market assessment of a solid state diesel engine controller. The flat conductor cable and the flood insurance studies are given particular attention.
Dendrometer bands made easy: Using modified cable ties to measure incremental growth of trees1
Anemaet, Evelyn R.; Middleton, Beth A.
2013-01-01
• Premise of the study: Dendrometer bands are a useful way to make sequential repeated measurements of tree growth, but traditional dendrometer bands can be expensive, time consuming, and difficult to construct in the field. An alternative to the traditional method of band construction is to adapt commercially available materials. This paper describes how to construct and install dendrometer bands using smooth-edged, stainless steel, cable tie banding and attachable rollerball heads. • Methods and Results: As a performance comparison, both traditional and cable tie dendrometer bands were installed on baldcypress trees at the National Wetlands Research Center in Lafayette, Louisiana, by both an experienced and a novice worker. Band installation times were recorded, and growth of the trees as estimated by the two band types was measured after approximately one year, demonstrating equivalence of the two methods. • Conclusions: This efficient approach to dendrometer band construction can help advance the knowledge of long-term tree growth in ecological studies. PMID:25202589
1962-07-03
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken July 3, 1962 depicts the Block House with a portion of its concrete walls poured and exposed while many are still in the forms stage.
A polytetrafluorethylene insulated cable for high temperature oxygen aerospace applications
NASA Technical Reports Server (NTRS)
Sheppard, A. T.; Webber, R. G.
1983-01-01
For electrical cables to function and survive in the severe high temperature oxygen environment that will be experienced in the external tanks of the space shuttle, extreme cleanliness and material purity is required. A flexible light weight cable has been developed for use in pure oxygen at worst case temperatures of -190 to +260 degrees Centigrade and pressures as high as 44 pounds per square inch absolute. A comprehensive series of tests were performed on cables manufactured to the best commercial practices in order to establish the basic guidelines for control of build configuration as well as each material used in construction of the cable.
A polytetrafluorethylene insulated cable for high temperature oxygen aerospace applications
NASA Astrophysics Data System (ADS)
Sheppard, A. T.; Webber, R. G.
For electrical cables to function and survive in the severe high temperature oxygen environment that will be experienced in the external tanks of the space shuttle, extreme cleanliness and material purity is required. A flexible light weight cable has been developed for use in pure oxygen at worst case temperatures of -190 to +260 degrees Centigrade and pressures as high as 44 pounds per square inch absolute. A comprehensive series of tests were performed on cables manufactured to the best commercial practices in order to establish the basic guidelines for control of build configuration as well as each material used in construction of the cable.
An anchoring system for fish habitat structures: field technique, evaluation, and application.
Barbara L. Fontaine; Thomas D. Merritt
1988-01-01
Steel cable can be used to bind rocks and logs together to construct fish habitat structures in streams. Cables must be securely anchored if structures are to withstand floods. This paper describes a way to anchor cables into bedrock or ballast boulders. Anchor tensile strength ranged from 7,500 to 36,500 pounds and was related to type of resin and embedment depth....
Constructing lightning towers for the Constellation Program and
2007-11-09
On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler puts a piling into place to be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
Constructing lightning towers for the Constellation Program and
2007-11-09
On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler lifts a piling into place to be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Knowledge Criteria C Appendix C to Subpart CC of Part 1926 Labor Regulations Relating to Labor (Continued... FOR CONSTRUCTION Cranes and Derricks in Construction Pt. 1926, Subpt. CC, App. C Appendix C to Subpart.../stabilizers and counterweights. (c) Operations. (1) How to pick, carry, swing and place the load smoothly and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Knowledge Criteria C Appendix C to Subpart CC of Part 1926 Labor Regulations Relating to Labor (Continued... FOR CONSTRUCTION Cranes and Derricks in Construction Pt. 1926, Subpt. CC, App. C Appendix C to Subpart.../stabilizers and counterweights. (c) Operations. (1) How to pick, carry, swing and place the load smoothly and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... accessories) to a complete stop; wind conditions; degree of sway in the power line; lighting conditions, and... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (all voltages)-equipment operations... FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1410 Power line safety (all voltages...
Design of a cryogenic system for a 20m direct current superconducting MgB2 and YBCO power cable
NASA Astrophysics Data System (ADS)
Cheadle, Michael J.; Bromberg, Leslie; Jiang, Xiaohua; Glowacki, Bartek; Zeng, Rong; Minervini, Joseph; Brisson, John
2014-01-01
The Massachusetts Institute of Technology, the University of Cambridge in the United Kingdom, and Tsinghua University in Beijing, China, are collaborating to design, construct, and test a 20 m, direct current, superconducting MgB2 and YBCO power cable. The cable will be installed in the State Key Laboratory of Power Systems at Tsinghua University in Beijing beginning in 2013. In a previous paper [1], the cryogenic system was briefly discussed, focusing on the cryogenic issues for the superconducting cable. The current paper provides a detailed discussion of the design, construction, and assembly of the cryogenic system and its components. The two-stage system operates at nominally 80 K and 20 K with the primary cryogen being helium gas. The secondary cryogen, liquid nitrogen, is used to cool the warm stage of binary current leads. The helium gas provides cooling to both warm and cold stages of the rigid cryostat housing the MgB2 and YBCO conductors, as well as the terminations of the superconductors at the end of the current leads. A single cryofan drives the helium gas in both stages, which are thermally isolated with a high effectiveness recuperator. Refrigeration for the helium circuit is provided by a Sumitomo RDK415 cryocooler. This paper focuses on the design, construction, and assembly of the cryostat, the recuperator, and the current leads with associated superconducting cable terminations.
Scott and Doi conduct tool evaluations during second EVA of STS-87
1997-12-03
STS087-341-036 (3 Dec. 1997) --- Backdropped against a dark Earth and a light blue horizon, astronaut Takao Doi (right), international mission specialist representing Japan's National Space Development Agency (NASDA), works with a crane while astronaut Winston E. Scott looks on. This second extravehicular activity (EVA) of the mission continued the evaluation of techniques and hardware to be used in constructing the International Space Station (ISS). Near Scott can be seen the representation of a small Orbital Replacement Unit (ORU) in the grasp of the 156-pound crane operated by Doi. A similar crane could be used to transport various sized ORU’s from translation carts on the exterior of the ISS to various worksites on the truss structure. This view was captured, on 35mm film, by a crew mate in the shirt sleeve environment of the Space Shuttle Columbia's cabin. The SPARTAN-201 satellite is in its stowed position at frame center.
The Barrett-Crane model: asymptotic measure factor
NASA Astrophysics Data System (ADS)
Kamiński, Wojciech; Steinhaus, Sebastian
2014-04-01
The original spin foam model construction for 4D gravity by Barrett and Crane suffers from a few troubling issues. In the simple examples of the vertex amplitude they can be summarized as the existence of contributions to the asymptotics from non-geometric configurations. Even restricted to geometric contributions the amplitude is not completely worked out. While the phase is known to be the Regge action, the so-called measure factor has remained mysterious for a decade. In the toy model case of the 6j symbol this measure factor has a nice geometric interpretation of V-1/2 leading to speculations that a similar interpretation should be possible also in the 4D case. In this paper we provide the first geometric interpretation of the geometric part of the asymptotic for the spin foam consisting of two glued 4-simplices (decomposition of the 4-sphere) in the Barrett-Crane model in the large internal spin regime.
1999-05-27
In the Operations and Checkout Building, STS-96 Commander Kent V. Rominger dons his launch and entry suit, plus helmet, during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Mission Specialist Tamara E. Jernigan waves after donning her launch and entry suit during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Pilot Rick D. Husband waves while being checked by a suit technician after donning his launch and entry suit during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Mission Specialist Daniel T. Barry waves after donning his launch and entry suit during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Mission Specialist Ellen Ochoa is checked by a suit technician after donning her launch and entry suit during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Mission Specialist Julie Payette is assisted by a suit technician in donning her launch and entry suit during final launch preparations. Payette is with the Canadian Space Agency. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
2009-02-18
VANDENBERG AIR FORCE BASE, Calif. -- On Launch Complex 576-E at Vandenberg Air Force Base in California, the crane in the foreground moves the cables used to lower NASA's Orbiting Carbon Observatory, OCO, upper stack onto to the Taurus XL Stage 0 motor behind it. The upper stack consists of Stages 1, 2 and 3 of the Taurus, as well as the encapsulated OCO spacecraft. OCO is scheduled for launch the Taurus rocket Feb. 24 from Vandenberg. The spacecraft will collect precise global measurements of carbon dioxide (CO2) in the Earth's atmosphere. Scientists will analyze OCO data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important greenhouse gas. Photo credit: NASA/Richard Nielsen, VAFB
Non-rocket Earth-Moon transport system
NASA Astrophysics Data System (ADS)
Bolonkin, Alexander
2003-06-01
This paper proposes a new transportation system for travel between Earth and Moon. This transportation system uses mechanical energy transfer and requires only minimal energy, using an engine located on Earth. A cable directly connects a pole of the Earth through a drive station to the lunar surface_ The equation for an optimal equal stress cable for complex gravitational field of Earth-Moon has been derived that allows significantly lower cable masses. The required strength could be provided by cables constructed of carbon nanotubes or carbon whiskers. Some of the constraints on such a system are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
See, Alan; Rinehart, Bennie N; Marin, Glen
1998-11-01
The Haines to Skagway submarine cable project is located n Taiya Inlet, at the north end of Lynn Canal, in Southeast Alaska. The cable is approximately 15 miles long, with three landings and splice vaults. The cable is 35 kV, 3-Phase, and armored. The cable interconnects the Goat Lake Hydro Project near Skagway with the community of Haines. Both communities are now on 100% hydroelectric power. The Haines to Skagway submarine cable is the result of AP&T's goal of an alternative, economic, and environmentally friendly energy source for the communities served and to eliminate the use of diesel fuel asmore » the primary source of energy. Diesel units will continue to be used as a backup system.« less
Cemented total hip replacement cable debris and acetabular construct durability.
Altenburg, Aaron J; Callaghan, John J; Yehyawi, Tameem M; Pedersen, Douglas R; Liu, Steve S; Leinen, Jessica A; Dahl, Kevin A; Goetz, Devon D; Brown, Thomas D; Johnston, Richard C
2009-07-01
Third-body wear can adversely affect the outcome of total hip arthroplasty by causing increased polyethylene wear, osteolysis, and component loosening. We hypothesized that there would be greater generation and migration of metal debris to the bearing surfaces in hips in which cobalt-chromium cables were used to reattach the osteotomized greater trochanter when compared with hips in which stainless steel wires were used. Between June 1981 and December 1983, 196 consecutive total hip arthroplasties were performed with use of an Iowa stem and a titanium-backed cemented acetabular component, with cobalt-chromium cable trochanteric reattachment. After nineteen to twenty years of follow-up, the patients were evaluated with regard to the depth of head penetration into the polyethylene (as a surrogate for wear), osteolysis, loosening, and the need for revision. The results were compared with those for a series of 304 total hip arthroplasties that were performed by the same surgeon from January 1984 to December 1985 with use of the same components and the same surgical technique, but with stainless steel wire trochanteric reattachment. The two groups had a comparable nineteen to twenty-year follow-up. All living patients (fifty-nine hips in the cable group and ninety-two hips in the wire group) had minimum ten-year follow-up radiographs. The polyethylene wear rate was 0.101 mm/yr for the cable group and 0.082 mm/yr for the wire group (p = 0.039). For the living patients, the rate of revision of the acetabular component because of aseptic loosening was 37.3% (twenty-two hips) for the cable group and 20.7% (nineteen hips) for the wire group (p = 0.025). The rate of acetabular osteolysis was 44% (twenty-six hips) for the cable group and 26% (twenty-four hips) for the wire group (p = 0.022). Kaplan-Meier analysis with revision of the acetabular component because of aseptic loosening as the end point demonstrated survival rates of 73.7% +/- 9% and 83% +/- 7% for the cable and wire groups, respectively, at twenty years (p = 0.03). Because cable trochanteric attachment led to significantly greater polyethylene wear, osteolysis, acetabular loosening, and acetabular revision, presumably due to third-body metallic debris generation in this cemented total hip replacement construct, surgeons should be aware of the deleterious effects of third-body debris and avoid the use of potential debris generators in the total hip arthroplasty construct. If cable is used and fretting is recognized, especially with intra-articular migration of metallic material or nonunion of the greater trochanter, consideration should be given to cable removal.
Development of in-vessel components of the microfission chamber for ITER.
Ishikawa, M; Kondoh, T; Ookawa, K; Fujita, K; Yamauchi, M; Hayakawa, A; Nishitani, T; Kusama, Y
2010-10-01
Microfission chambers (MFCs) will measure the total neutron source strength in ITER. The MFCs will be installed behind blanket modules in the vacuum vessel (VV). Triaxial mineral insulated (MI) cables will carry signals from the MFCs. The joint connecting triaxial MI cables in the VV must be considered because the MFCs and the MI cables will be installed separately at different times. Vacuum tight triaxial connector of the MI cable has been designed and a prototype has been constructed. Performance tests indicate that the connector can be applied to the ITER environment. A small bending-radius test of the MI cable indicates no observed damage at a curvature radius of 100 mm.
Development of in-vessel components of the microfission chamber for ITER1
Ishikawa, M.; Kondoh, T.; Ookawa, K.; Fujita, K.; Yamauchi, M.; Hayakawa, A.; Nishitani, T.; Kusama, Y.
2010-01-01
Microfission chambers (MFCs) will measure the total neutron source strength in ITER. The MFCs will be installed behind blanket modules in the vacuum vessel (VV). Triaxial mineral insulated (MI) cables will carry signals from the MFCs. The joint connecting triaxial MI cables in the VV must be considered because the MFCs and the MI cables will be installed separately at different times. Vacuum tight triaxial connector of the MI cable has been designed and a prototype has been constructed. Performance tests indicate that the connector can be applied to the ITER environment. A small bending-radius test of the MI cable indicates no observed damage at a curvature radius of 100 mm. PMID:21033834
Optimal Design of Cable-Driven Manipulators Using Particle Swarm Optimization.
Bryson, Joshua T; Jin, Xin; Agrawal, Sunil K
2016-08-01
The design of cable-driven manipulators is complicated by the unidirectional nature of the cables, which results in extra actuators and limited workspaces. Furthermore, the particular arrangement of the cables and the geometry of the robot pose have a significant effect on the cable tension required to effect a desired joint torque. For a sufficiently complex robot, the identification of a satisfactory cable architecture can be difficult and can result in multiply redundant actuators and performance limitations based on workspace size and cable tensions. This work leverages previous research into the workspace analysis of cable systems combined with stochastic optimization to develop a generalized methodology for designing optimized cable routings for a given robot and desired task. A cable-driven robot leg performing a walking-gait motion is used as a motivating example to illustrate the methodology application. The components of the methodology are described, and the process is applied to the example problem. An optimal cable routing is identified, which provides the necessary controllable workspace to perform the desired task and enables the robot to perform that task with minimal cable tensions. A robot leg is constructed according to this routing and used to validate the theoretical model and to demonstrate the effectiveness of the resulting cable architecture.
In-plane free vibration analysis of cable arch structure
NASA Astrophysics Data System (ADS)
Zhao, Yueyu; Kang, Houjun
2008-05-01
Cable-stayed arch bridge is a new type of composite bridge, which utilizes the mechanical characters of cable and arch. Based on the supporting members of cable-stayed arch bridge and of erection of arch bridge using of the cantilever construction method with tiebacks, we propose a novel mechanical model of cable-arch structure. In this model, the equations governing vibrations of the cable-arch are derived according to Hamilton's principle for dynamic problems in elastic body under equilibrium state. Then, the program of solving the dynamic governing equations is ultimately established by the transfer matrix method for free vibration of uniform and variable cross-section, and the internal characteristics of the cable-arch are investigated. After analyzing step by step, the research results approve that the program is accurate; meanwhile, the mechanical model and method are both valuable and significant not only in theoretical research and calculation but also in design of engineering.
NASA Technical Reports Server (NTRS)
1972-01-01
The practical use of small-gage round wire for electrical wiring in manned air and space vehicle environments is discussed. The investigation consisted on a study of wire construction and candidate wire harness concepts, fabrication of small-gage wire harnesses, and verification of promising configurations by laboratory evaluation. The wire constructions selected for harness fabrication are described. Results of the laboratory evaluation are included.
42. Exterior view of dockage and barracks on piers used ...
42. Exterior view of dockage and barracks on piers used during construction of minesweepers. Now used for storage. Sunken barge crane in foreground. - Barbour Boat Works, Tryon Palace Drive, New Bern, Craven County, NC
Constructing lightning towers for the Constellation Program and
2007-11-09
On Launch Pad 39B at NASA's Kennedy Space Center, the crane crawler lifts a piling off a truck. The piling will be pounded into the ground to help construct lightning towers for the Constellation Program and Ares/Orion launches. Pad B will be the site of the first Ares vehicle launch, including Ares I-X which is scheduled for April 2009.
NASA Astrophysics Data System (ADS)
Kumagai, Daisuke; Ohsaki, Hiroyuki; Tomita, Masaru
2016-12-01
A superconducting power cable has merits of a high power transmission capacity, transmission losses reduction, a compactness, etc., therefore, we have been studying the feasibility of applying superconducting power cables to DC electric railway feeding systems. However, a superconducting power cable is required to be cooled down and kept at a very low temperature, so it is important to reveal its thermal and cooling characteristics. In this study, electric circuit analysis models of the system and thermal analysis models of superconducting cables were constructed and the system behaviors were simulated. We analyzed the heat generation by a short circuit accident and transient temperature distribution of the cable to estimate the value of temperature rise and the time required from the accident. From these results, we discussed a feasibility of superconducting cables for DC electric railway feeding systems. The results showed that the short circuit accident had little impact on the thermal condition of a superconducting cable in the installed system.
Fully synthetic taped insulation cables
Forsyth, E.B.; Muller, A.C.
1983-07-15
The present invention is a cable which, although constructed from inexpensive polyolefin tapes and using typical impregnating oils, furnishes high voltage capability up to 765 kV, and has such excellent dielectric characteristics and heat transfer properties that it is capable of operation at capacities equal to or higher than presently available cables at a given voltage. This is accomplished by using polyethylene, polybutene or polypropylene insulating tape which has been specially processed to attain properties which are not generally found in these materials, but are required for their use in impregnated electrical cables. Chief among these properties is compatibility with impregnating oil.
1963-02-04
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photograph taken February 4, 1963, gives an impressive look at the Block House looking directly through the ever-growing four towers of the S-IC Test Stand.
Lorenz, Sonja; Deng, Patricia; Hantschel, Oliver; Superti-Furga, Giulio; Kuriyan, John
2015-06-01
Constitutive activation of the non-receptor tyrosine kinase c-Abl (cellular Abelson tyrosine protein kinase 1, Abl1) in the Bcr (breakpoint cluster region)-Abl1 fusion oncoprotein is the molecular cause of chronic myeloid leukaemia (CML). Recent studies have indicated that an interaction between the SH2 (Src-homology 2) domain and the N-lobe (N-terminal lobe) of the c-Abl kinase domain (KD) has a critical role in leukaemogenesis [Grebien et al. (2011) Cell 147, 306-319; Sherbenou et al. (2010) Blood 116, 3278-3285]. To dissect the structural basis of this phenomenon, we studied c-Abl constructs comprising the SH2 and KDs in vitro. We present a crystal structure of an SH2-KD construct bound to dasatinib, which contains the relevant interface between the SH2 domain and the N-lobe of the KD. We show that the presence of the SH2 domain enhances kinase activity moderately and that this effect depends on contacts in the SH2/N-lobe interface and is abrogated by specific mutations. Consistently, formation of the interface decreases slightly the association rate of imatinib with the KD. That the effects are small compared with the dramatic in vivo consequences suggests an important function of the SH2-N-lobe interaction might be to help disassemble the auto-inhibited conformation of c-Abl and promote processive phosphorylation, rather than substantially stimulate kinase activity.
30 CFR 18.35 - Portable (trailing) cables and cords.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction... used to conduct electrical energy to face equipment shall conform to the following: (1) Have each conductor of a current-carrying capacity consistent with the Insulated Power Cable Engineers Association...
30 CFR 18.35 - Portable (trailing) cables and cords.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction... used to conduct electrical energy to face equipment shall conform to the following: (1) Have each conductor of a current-carrying capacity consistent with the Insulated Power Cable Engineers Association...
30 CFR 18.35 - Portable (trailing) cables and cords.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction... used to conduct electrical energy to face equipment shall conform to the following: (1) Have each conductor of a current-carrying capacity consistent with the Insulated Power Cable Engineers Association...
30 CFR 18.35 - Portable (trailing) cables and cords.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction... used to conduct electrical energy to face equipment shall conform to the following: (1) Have each conductor of a current-carrying capacity consistent with the Insulated Power Cable Engineers Association...
Field instrumentation and measured response of the I-295 cable-stayed bridge.
DOT National Transportation Integrated Search
1992-01-01
This first report describes the results of a field study of the live load responses of a segmentally constructed prestressed concrete cable-stayed bridge. The main span of the test structure consists of twin box girders connected by delta frames. Kno...
Application of 3D Laser Scanner to Forensic Engineering.
Park, Chan-Seong; Jeon, Hong-Pil; Choi, Kwang-Soo; Kim, Jin-Pyo; Park, Nam-Kyu
2018-05-01
In the case of building collapses and overturned structures, a three-dimensional (3D) collapse or overturn model is required to reconstruct the accident. As construction sites become increasingly complex and large, 3D laser scanning is sometimes the best tool to accurately document and store the site conditions. This case report presents one case of a structure collapse and one case of an overturned crane reconstructed by a 3D laser scanner. In the case of structural collapse of a prefabricated shoring system, a 3D model reconstructed all the members successfully, a task that is nearly impossible using a scale such as a tape measure. The reconstructed prefabricated shoring system was verified through a structural analysis through comparison with the construction drawings to investigate faults in construction. In the case of the overturned crane, the jib angle and other major dimensions were successfully acquired through 3D laser scanning and used to estimate the working radius. As a result, the propriety of the working radius with the given lifting load was successfully determined. © 2017 American Academy of Forensic Sciences.
30 CFR 18.40 - Cable clamps and grips.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cable clamps and grips. 18.40 Section 18.40 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design...
14 CFR 23.689 - Cable systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control... primary control systems; (2) Each cable system must be designed so that there will be no hazardous change... be used in the control system. (e) Turnbuckles must be attached to parts having angular motion in a...
14 CFR 23.689 - Cable systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control... primary control systems; (2) Each cable system must be designed so that there will be no hazardous change... be used in the control system. (e) Turnbuckles must be attached to parts having angular motion in a...
14 CFR 23.689 - Cable systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control... primary control systems; (2) Each cable system must be designed so that there will be no hazardous change... be used in the control system. (e) Turnbuckles must be attached to parts having angular motion in a...
14 CFR 23.689 - Cable systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control... primary control systems; (2) Each cable system must be designed so that there will be no hazardous change... be used in the control system. (e) Turnbuckles must be attached to parts having angular motion in a...
14 CFR 23.689 - Cable systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control... primary control systems; (2) Each cable system must be designed so that there will be no hazardous change... be used in the control system. (e) Turnbuckles must be attached to parts having angular motion in a...
29 CFR 1926.760 - Fall protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.760 Fall protection. (a... a steel erection activity who is on a walking/working surface with an unprotected side or edge more.... (2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at...
29 CFR 1926.760 - Fall protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.760 Fall protection. (a... a steel erection activity who is on a walking/working surface with an unprotected side or edge more.... (2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at...
29 CFR 1926.760 - Fall protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.760 Fall protection. (a... a steel erection activity who is on a walking/working surface with an unprotected side or edge more.... (2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at...
29 CFR 1926.760 - Fall protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.760 Fall protection. (a... a steel erection activity who is on a walking/working surface with an unprotected side or edge more.... (2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at...
29 CFR 1926.760 - Fall protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.760 Fall protection. (a... a steel erection activity who is on a walking/working surface with an unprotected side or edge more.... (2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at...
Impact of distributed virtual reality on engineering knowledge retention and student engagement
NASA Astrophysics Data System (ADS)
Sulbaran, Tulio Alberto
Engineering Education is facing many problems, one of which is poor knowledge retention among engineering students. This problem affects the Architecture, Engineering, and Construction (A/E/C) industry, because students are unprepared for many necessary job skills. This problem of poor knowledge retention is caused by many factors, one of which is the mismatch between student learning preferences and the media used to teach engineering. The purpose of this research is to assess the impact of Distributed Virtual Reality (DVR) as an engineering teaching tool. The implementation of DVR addresses the issue of poor knowledge retention by impacting the mismatch between learning and teaching style in the visual versus verbal spectrum. Using as a point of departure three knowledge domain areas (Learning and Instruction, Distributed Virtual Reality and Crane Selection as Part of Crane Lift Planning), a DVR engineering teaching tool is developed, deployed and assessed in engineering classrooms. The statistical analysis of the data indicates that: (1) most engineering students are visual learners; (2) most students would like more classes using DVR; (3) engineering students find DVR more engaging than traditional learning methods; (4) most students find the responsiveness of the DVR environments to be either good or very good; (5) all students are able to interact with DVR and most of the students found it easy or very easy to navigate (without previous formal training in how to use DVR); (6) students' knowledge regarding the subject (crane selection) is higher after the experiment; and, (7) students' using different instructional media do not demonstrate statistical difference in knowledge retained after the experiment. This inter-disciplinary research offers opportunities for direct and immediate application in education, research, and industry, due to the fact that the instructional module developed (on crane selection as part of construction crane lift planning) can be used to convey knowledge to engineers beyond the classrooms. This instructional module can also be used as a workbench to assess parameters on engineering education such as time on task, assessment media, and long-term retention among others.
2001-03-02
Workers at Launch Pad 17-A, Cape Canaveral Air Force Station, attach cables from a crane to one piece of the fairing that will cover the Mars Odyssey Orbiter during launch on a Delta rocket. The 2001 Mars Odyssey Orbiter is scheduled for launch April 7, 2001. Mars Odyssey contains three science instruments: THEMIS, the Gamma Ray Spectrometer (GRS), and the Mars Radiation Environment Experiment (MARIE). THEMIS will map the mineralogy and morphology of the Martian surface using a high-resolution camera and a thermal infrared imaging spectrometer. The GRS will achieve global mapping of the elemental composition of the surface and determine the abundance of hydrogen in the shallow subsurface. The MARIE will characterize aspects of the near-space radiation environment with regards to the radiation-related risk to human explorers
2009-01-27
CAPE CANAVERAL, Fla. – In Vehicle Assembly Building high bay 4, cables from an overhead crane lower ballast into segment 7 for the Ares I-X rocket. These ballast assemblies are being installed in the upper stage segments 1 and 7 and will mimic the mass of the fuel. Their total weight is approximately 160,000 pounds. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Jack Pfaller
2008-05-03
CAPE CANAVERAL, Fla. -- At the Astrotech payload processing facility in Titusville, Fla., technicians attach the cables to the overhead crane that will be used to lift NASA's Gamma-ray Large Area Space Telescope, or GLAST, spacecraft. The spacecraft is being prepared for its move to the Hazardous Processing Facility for fueling. The GLAST is a powerful space observatory that will explore the universe's ultimate frontier, where nature harnesses forces and energies far beyond anything possible on Earth; probe some of science's deepest questions, such as what our Universe is made of, and search for new laws of physics; explain how black holes accelerate jets of material to nearly light speed; and help crack the mystery of stupendously powerful explosions known as gamma-ray bursts. A launch date is still to be determined. Photo credit: NASA/Mike Kerley
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians adjust the cables of an overhead crane on the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre. The arm will be moved to and installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station ISS. Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
29 CFR 1926.404 - Wiring design and protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...
29 CFR 1926.404 - Wiring design and protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...
1962-03-31
At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow tunnel which housed the cables for the controls. Again to the east, just south of the Block House, was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton water deflector at the rate of 320,000 gallons per minute. In this photo, taken March 20, 1962, construction of the Pump House area is well underway.
1999-05-27
KENNEDY SPACE CENTER, FLA. -- The launch of Space Shuttle Discovery on mission STS-96 is reflected in the waters of Banana Creek just after sunrise. Liftoff occurred at 6:49:42 a.m. EDT. In the shadows near the bottom are silhouetted a number of spectators at the Banana Creek viewing site. STS-96 is on a 10-day logistics and resupply mission for the International Space Station. Along with such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment, Discovery carries about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission includes a space walk to attach the cranes to the outside of the ISS for use in future construction. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
1999-05-27
In the Operations and Checkout Building, STS-96 Mission Specialist Valery Ivanovich Tokarev, who represents the Russian Space Agency, waves as he is assisted by a suit technician in donning his launch and entry suit during final launch preparations. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction.. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
Cemented Total Hip Replacement Cable Debris and Acetabular Construct Durability
Altenburg, Aaron J.; Callaghan, John J.; Yehyawi, Tameem M.; Pedersen, Douglas R.; Liu, Steve S.; Leinen, Jessica A.; Dahl, Kevin A.; Goetz, Devon D.; Brown, Thomas D.; Johnston, Richard C.
2009-01-01
Background: Third-body wear can adversely affect the outcome of total hip arthroplasty by causing increased polyethylene wear, osteolysis, and component loosening. We hypothesized that there would be greater generation and migration of metal debris to the bearing surfaces in hips in which cobalt-chromium cables were used to reattach the osteotomized greater trochanter when compared with hips in which stainless steel wires were used. Methods: Between June 1981 and December 1983, 196 consecutive total hip arthroplasties were performed with use of an Iowa stem and a titanium-backed cemented acetabular component, with cobalt-chromium cable trochanteric reattachment. After nineteen to twenty years of follow-up, the patients were evaluated with regard to the depth of head penetration into the polyethylene (as a surrogate for wear), osteolysis, loosening, and the need for revision. The results were compared with those for a series of 304 total hip arthroplasties that were performed by the same surgeon from January 1984 to December 1985 with use of the same components and the same surgical technique, but with stainless steel wire trochanteric reattachment. The two groups had a comparable nineteen to twenty-year follow-up. All living patients (fifty-nine hips in the cable group and ninety-two hips in the wire group) had minimum ten-year follow-up radiographs. Results: The polyethylene wear rate was 0.101 mm/yr for the cable group and 0.082 mm/yr for the wire group (p = 0.039). For the living patients, the rate of revision of the acetabular component because of aseptic loosening was 37.3% (twenty-two hips) for the cable group and 20.7% (nineteen hips) for the wire group (p = 0.025). The rate of acetabular osteolysis was 44% (twenty-six hips) for the cable group and 26% (twenty-four hips) for the wire group (p = 0.022). Kaplan-Meier analysis with revision of the acetabular component because of aseptic loosening as the end point demonstrated survival rates of 73.7% ± 9% and 83% ± 7% for the cable and wire groups, respectively, at twenty years (p = 0.03). Conclusions: Because cable trochanteric attachment led to significantly greater polyethylene wear, osteolysis, acetabular loosening, and acetabular revision, presumably due to third-body metallic debris generation in this cemented total hip replacement construct, surgeons should be aware of the deleterious effects of third-body debris and avoid the use of potential debris generators in the total hip arthroplasty construct. If cable is used and fretting is recognized, especially with intra-articular migration of metallic material or nonunion of the greater trochanter, consideration should be given to cable removal. Level of Evidence: Therapeutic Level III. See Instructions to Authors for a complete description of levels of evidence. PMID:19571089
NASA Astrophysics Data System (ADS)
Pedersen, J. R.; Holte, T. A.; Johansen, E.
Cables with improved fire resistance and flame retardance have been developed. They will continue to function at least 3 hours even at temperatures up to 1000 C and do not propagate fire when tested according to IEC 332 part 3 1982, category A. Made with halogenfree materials they give off no corrosive gases and very little visible smoke in cases of fire. Cables are made for power, signal and instrument installations in hospitals, high rise buildings, railroad cars, subways, on board ship, oil rigs and oil production platforms. The offshore cables are specially constructed to withstand the rugged climatic conditions in the North Sea area.
NASA Astrophysics Data System (ADS)
Liu, Hongfei; Pan, Gaofeng; Lin, Zhong; Liu, Cheng; Zhu, Wenbai; Nan, Rendong; Li, Chunsheng; Gao, Guanjun; Luo, Wenyong; Jin, Chengjin; Song, Jinyou
2017-11-01
The construction of FAST telescope was completed in Guizhou province of China in September 2016, and a kind of novel high-stability 48-core bendable and movable optical cable was developed and applied in analog data optical transmission system of FAST. Novel structure and selective material of this optical cable ensure high stability of optical power in the process of cables round-trip motion when telescope is tracking a radio source. The 105 times bend and stretch accelerated experiment for this optical cable was implemented, and real-time optical and RF signal power fluctuation were measured. The physical structure of optical cables after 105 times round-trip motion is in good condition; the real-time optical power attenuation fluctuation is smaller than 0.044 dB; the real-time RF power fluctuation is smaller than 0.12 dB. The optical cable developed in this letter meets the requirement of FAST and has been applied in FAST telescope.
Huhn, S L; Wolf, A L; Ecklund, J
1991-12-01
Cervical instability secondary to fracture/dislocation or traumatic subluxation involving the posterior elements may be treated by a variety of fusion techniques. The rigidity of the stainless steel wires used in posterior cervical fusions often leads to difficulty with insertion, adequate tension, and conformation of the graft construct. This report describes a technique of posterior cervical fusion employing a wire system using flexible stainless steel cables. The wire consists of a flexible, 49-strand, stainless steel cable connected on one end to a short, malleable, blunt leader with the opposite end connected to a small islet. The cable may be used in occipitocervical, atlantoaxial, facet-to-spinous process, and interspinous fusion techniques. The cable loop is secured by using a tension/crimper device that sets the desired tension in the cable. In addition to superior biomechanical strength, the flexibility of the cable allows greater ease of insertion and tension adjustment. In terms of direct operative instrumentation in posterior cervical arthrodesis, involving both the upper and lower cervical spine, the cable system appears to be a safe and efficient alternative to monofilament wires.
Lagrangian approach to the Barrett-Crane spin foam model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonzom, Valentin; Laboratoire de Physique, ENS Lyon, CNRS UMR 5672, 46 Allee d'Italie, 69007 Lyon; Livine, Etera R.
2009-03-15
We provide the Barrett-Crane spin foam model for quantum gravity with a discrete action principle, consisting in the usual BF term with discretized simplicity constraints which in the continuum turn topological BF theory into gravity. The setting is the same as usually considered in the literature: space-time is cut into 4-simplices, the connection describes how to glue these 4-simplices together and the action is a sum of terms depending on the holonomies around each triangle. We impose the discretized simplicity constraints on disjoint tetrahedra and we show how the Lagrange multipliers distort the parallel transport and the correlations between neighboringmore » simplices. We then construct the discretized BF action using a noncommutative * product between SU(2) plane waves. We show how this naturally leads to the Barrett-Crane model. This clears up the geometrical meaning of the model. We discuss the natural generalization of this action principle and the spin foam models it leads to. We show how the recently introduced spin foam fusion coefficients emerge with a nontrivial measure. In particular, we recover the Engle-Pereira-Rovelli spin foam model by weakening the discretized simplicity constraints. Finally, we identify the two sectors of Plebanski's theory and we give the analog of the Barrett-Crane model in the nongeometric sector.« less
Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
NASA Astrophysics Data System (ADS)
Shi, Jing Xian; Ran, Zhi Hong
2018-06-01
During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Scope. 1926.1500 Section 1926.1500 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks Used in Demolition and Underground...
ERIC Educational Resources Information Center
Tech Directions, 2010
2010-01-01
Diesel engine technicians maintain and repair the engines that power transportation equipment such as heavy trucks, trains, buses, and locomotives. Some technicians work mainly on farm machines, ships, compressors, and pumps. Others work mostly on construction equipment such as cranes, power shovels, bulldozers, and paving machines. This article…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 8 2010-07-01 2010-07-01 false Conveyors. 1926.555 Section 1926.555 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes, Derricks, Hoists, Elevators, and Conveyors § 1926...
Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program
NASA Technical Reports Server (NTRS)
Colozza, Anthony; Jakupca, Ian; Mintz, Toby; Herlacher, Mike; Hussey, Sam
2012-01-01
A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.
Subsea Cable Tracking by Autonomous Underwater Vehicle with Magnetic Sensing Guidance.
Xiang, Xianbo; Yu, Caoyang; Niu, Zemin; Zhang, Qin
2016-08-20
The changes of the seabed environment caused by a natural disaster or human activities dramatically affect the life span of the subsea buried cable. It is essential to track the cable route in order to inspect the condition of the buried cable and protect its surviving seabed environment. The magnetic sensor is instrumental in guiding the remotely-operated vehicle (ROV) to track and inspect the buried cable underseas. In this paper, a novel framework integrating the underwater cable localization method with the magnetic guidance and control algorithm is proposed, in order to enable the automatic cable tracking by a three-degrees-of-freedom (3-DOF) under-actuated autonomous underwater vehicle (AUV) without human beings in the loop. The work relies on the passive magnetic sensing method to localize the subsea cable by using two tri-axial magnetometers, and a new analytic formulation is presented to compute the heading deviation, horizontal offset and buried depth of the cable. With the magnetic localization, the cable tracking and inspection mission is elaborately constructed as a straight-line path following control problem in the horizontal plane. A dedicated magnetic line-of-sight (LOS) guidance is built based on the relative geometric relationship between the vehicle and the cable, and the feedback linearizing technique is adopted to design a simplified cable tracking controller considering the side-slip effects, such that the under-actuated vehicle is able to move towards the subsea cable and then inspect its buried environment, which further guides the environmental protection of the cable by setting prohibited fishing/anchoring zones and increasing the buried depth. Finally, numerical simulation results show the effectiveness of the proposed magnetic guidance and control algorithm on the envisioned subsea cable tracking and the potential protection of the seabed environment along the cable route.
Subsea Cable Tracking by Autonomous Underwater Vehicle with Magnetic Sensing Guidance
Xiang, Xianbo; Yu, Caoyang; Niu, Zemin; Zhang, Qin
2016-01-01
The changes of the seabed environment caused by a natural disaster or human activities dramatically affect the life span of the subsea buried cable. It is essential to track the cable route in order to inspect the condition of the buried cable and protect its surviving seabed environment. The magnetic sensor is instrumental in guiding the remotely-operated vehicle (ROV) to track and inspect the buried cable underseas. In this paper, a novel framework integrating the underwater cable localization method with the magnetic guidance and control algorithm is proposed, in order to enable the automatic cable tracking by a three-degrees-of-freedom (3-DOF) under-actuated autonomous underwater vehicle (AUV) without human beings in the loop. The work relies on the passive magnetic sensing method to localize the subsea cable by using two tri-axial magnetometers, and a new analytic formulation is presented to compute the heading deviation, horizontal offset and buried depth of the cable. With the magnetic localization, the cable tracking and inspection mission is elaborately constructed as a straight-line path following control problem in the horizontal plane. A dedicated magnetic line-of-sight (LOS) guidance is built based on the relative geometric relationship between the vehicle and the cable, and the feedback linearizing technique is adopted to design a simplified cable tracking controller considering the side-slip effects, such that the under-actuated vehicle is able to move towards the subsea cable and then inspect its buried environment, which further guides the environmental protection of the cable by setting prohibited fishing/anchoring zones and increasing the buried depth. Finally, numerical simulation results show the effectiveness of the proposed magnetic guidance and control algorithm on the envisioned subsea cable tracking and the potential protection of the seabed environment along the cable route. PMID:27556465
44. SECOND FLOOR 'ANNEX' INTERIOR VIEW TO SOUTHWEST: Interior ...
44. SECOND FLOOR 'ANNEX' - INTERIOR VIEW TO SOUTHWEST: Interior view towards southwest on second floor of the powerhouse 'annex.' Note the steel column and beam construction and the old shunt car formerly used to move cable cars around the yard. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
Cable Television: A Guide for Education Planners.
ERIC Educational Resources Information Center
Carpenter, Polly
This second volume of a two-part study is intended to help educators construct viable plans for the use of cable television (CATV) in education. Following an introductory consideration of CATV as a means of distribution, the report lays out the steps for the planning, development, operation, and evaluation of a project, illustrating successful…
NASA Astrophysics Data System (ADS)
Khandelwal, P.; Pachori, A.; Khandelwal, T.
2013-12-01
This paper provides the complete information related to Right of Way (RoW) for the construction of new power transmission line (TL) in terms of present cost for overhead transmission line and underground XLPE transmission cable. The former part of the paper describes the general procedure and rules for acquisition of land for RoW by transmission asset owner (TAO) while in the later part the cost associated to acquire RoW and its impact on the cost of adjacent land have been detailed. It also discusses the actual dismantling cost including the cost of waste metal what TAO get after completion of lifecycle of TL due to increase in metal prices. In this paper cost of RoW after completion of lifecycle of TL is also highlighted. This paper compares the cost of RoW for overhead transmission line and underground XLPE transmission cable for construction of new TL. Also for old transmission infrastructure cost of RoW for change from overhead transmission line to underground XLPE transmission cable is detailed by application of replacement model.
Method of constructing a superconducting magnet
Satti, John A.
1981-01-01
A superconducting magnet designed to produce magnetic flux densities of the order of 4 to 5 Webers per square meter is constructed by first forming a cable of a plurality of matrixed superconductor wires with each wire of the plurality insulated from each other one. The cable is shaped into a rectangular cross-section and is wound with tape in an open spiral to create cooling channels. Coils are wound in a calculated pattern in saddle shapes to produce desired fields, such as dipoles, quadrupoles, and the like. Wedges are inserted between adjacent cables as needed to maintain substantially radial placement of the long dimensions of cross sections of the cables. After winding, individual strands in each of the cables are brought out to terminals and are interconnected to place all of the strands in series and to maximize the propagation of a quench by alternating conduction from an inner layer to an outer layer and from top half to bottom half as often as possible. Individual layers are separated from others by spiraled aluminum spacers to facilitate cooling. The wound coil is wrapped with an epoxy tape that is cured by heat and then machined to an interference fit with an outer aluminum pipe which is then affixed securely to the assembled coil by heating it to make a shrink fit. In an alternate embodiment, one wire of the cable is made of copper or the like to be heated externally to propagate a quench.
Parsons, J R; Chokshi, B V; Lee, C K; Gundlapalli, R V; Stamer, D
1997-02-01
Data was gathered from biomechanical testing of 10 thoracic human cadaveric spines. Spines were tested intact and with a Luque rectangle fixed with wire or cable. To compare the rigidity of fixation and intraspinal penetration of sublaminar monofilament wire and multistrand cable under identical conditions using human cadaveric spines. Reports of neurologic and mechanical complications associated with sublaminar wiring techniques have led to the recent development of more flexible multistrand cable systems. The relative performance of flexible cable versus monofilament wire has not been explored fully in a controlled mechanical environment. A servohydraulic mechanical testing machine was used to measure the static mechanical stiffness of sublaminar wire or cable fixation in conjunction with a Luque rectangle for thoracic human cadaveric spine segments in flexion-extension and torsion modes. Cyclic testing was performed in the flexion-extension mode. Intraspinal penetration of wires and cables was measured. Spine fixation with sublaminar wire and cable resulted in constructs of equal stiffness in flexion-extension and torsion modes. Cyclic testing also indicated similar fatigue profiles for wire- and cable-instrumented spines. Wire and cable fixed spines displayed greater stiffness than the intact spines. Cable encroachment of the spinal canal was less than that seen with wire. Sublaminar multistrand cable may be a rational alternative to monofilament wire in segmental spinal instrumentation because it provides less encroachment into the spinal canal. Further, cadaveric spines instrumented with wire and cable display equivalent mechanical behavior, statically and under cyclic loading. The potential advantages of cable, however, must be balanced against a substantial increase in cost relative to wire.
29 CFR 1926.1418 - Authority to stop operation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Authority to stop operation. 1926.1418 Section 1926.1418 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in...
29 CFR 1926.1422 - Signals-hand signal chart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Signals-hand signal chart. 1926.1422 Section 1926.1422 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in...
29 CFR 1926.1429 - Qualifications of maintenance & repair employees.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Qualifications of maintenance & repair employees. 1926.1429 Section 1926.1429 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... cranes, steam shovels, pile drivers, and machines of similar construction, and maintenance machines built prior to September 21, 1945. (3) Export, industrial, and other cars not owned by a railroad which are... shipper, stating that such movement is being made under the authority of this paragraph. (4) Industrial...
2014-05-28
CAPE CANAVERAL, Fla. -- Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. In this view looking up from beneath the ML, the tower and a large crane are visible. The crane is situated near the ML for lifting of heavy metal beams and other construction materials. Sections of the ML are being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper
Photocopy of photograph (from NBPPNSY, CSF35871264) Replogle, photographer, September 23, ...
Photocopy of photograph (from NBP-PNSY, CSF-3587-12-64) Replogle, photographer, September 23, 1921 view northwest from 350 - ton crane (Haer no. PA-387-F) of Philadelphia Navy Yard. Drydock no. 2 (Haer no. Pa-387-B) at right, below center of the photograph. This timber structure is 465 feet long, completed by yard labor in early 1915. The slip had dive McMyler Interstate Company rotating hammerhead cranes. It was the site where the U.S.S. Henderson, first ship built by the League Island yard, came down the ways on June 17, 1916. Between drydock no. 2 and slip no. 1 are small shipways, 210 feet long, used for construction of sea-going mine sweepers. The slip ways at the upper left of the photograph are nos. 2 and 3. They are of timber construction and were built in 1918 no. 2 was 850 and no. 3 700 feet long. - Naval Base Philadelphia-Philadelphia Naval Shipyard, League Island, Philadelphia, Philadelphia County, PA
Designing Crane Controls with Applied Mechanical and Electrical Safety Features
NASA Technical Reports Server (NTRS)
Lytle, Bradford P.; Walczak, Thomas A.
2002-01-01
The use of overhead traveling bridge cranes in many varied applications is common practice. In particular, the use of cranes in the nuclear, military, commercial, aerospace, and other industries can involve safety critical situations. Considerations for Human Injury or Casualty, Loss of Assets, Endangering the Environment, or Economic Reduction must be addressed. Traditionally, in order to achieve additional safety in these applications, mechanical systems have been augmented with a variety of devices. These devices assure that a mechanical component failure shall reduce the risk of a catastrophic loss of the correct and/or safe load carrying capability. ASME NOG-1-1998, (Rules for Construction of Overhead and Gantry Cranes, Top Running Bridge, and Multiple Girder), provides design standards for cranes in safety critical areas. Over and above the minimum safety requirements of todays design standards, users struggle with obtaining a higher degree of reliability through more precise functional specifications while attempting to provide "smart" safety systems. Electrical control systems also may be equipped with protective devices similar to the mechanical design features. Demands for improvement of the cranes "control system" is often recognized, but difficult to quantify for this traditionally "mechanically" oriented market. Finite details for each operation must be examined and understood. As an example, load drift (or small motions) at close tolerances can be unacceptable (and considered critical). To meet these high functional demands encoders and other devices are independently added to control systems to provide motion and velocity feedback to the control drive. This paper will examine the implementation of Programmable Electronic Systems (PES). PES is a term this paper will use to describe any control system utilizing any programmable electronic device such as Programmable Logic Controllers (PLC), or an Adjustable Frequency Drive (AID) 'smart' programmable motion controller. Therefore the use of the term Programmable Electronic Systems (PES) is an encompassing description for a large spectrum of programmable electronic control devices.
Flat conductor cable for electrical packaging
NASA Technical Reports Server (NTRS)
Angele, W.
1972-01-01
Flat conductor cable (FCC) is relatively new, highly promising means for electrical packaging and system integration. FCC offers numerous desirable traits (weight, volume and cost savings, flexibility, high reliability, predictable and repeatable electrical characteristics) which make it extremely attractive as a packaging medium. FCC, today, finds wide application in everything from integration of lunar equipment to the packaging of electronics in nuclear submarines. Described are cable construction and means of termination, applicable specifications and standards, and total FCC systems. A list of additional sources of data is also included for more intensive study.
Determination of ac conductor and pipe loss in pipe-type cable systems. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silver, D.A.; Seman, G.W.
1982-02-01
The results are presented of investigations into the determination of the ac/dc resistance ratios of high and extra high voltage pipe-type cables with conventional and large size segmental conductors in carbon steel, stainless steel and aluminum pipes in three cable per pipe and single cable per pipe configurations. The measurements included 115 through 765 kV cables with copper, enamel coated copper, and aluminum conductors in sizes of 2000 kcmil (1015 mm/sup 2/), 3250 kcmil (1650 mm/sup 2/), and 3500 kcmil (1776 mm/sup 2/). Calculations using presently available techniques were employed to provide correlation between measured and calculated values in bothmore » magnetic and non-magnetic pipes. In addition, a number of new techniques in conductor construction, pipe material and pipe liners and cable wraps were investigated as means of decreasing the ac/dc resistance ratios of pipe-type cables. Finally, the various systems studied were compared on the basis of system MVA rating and by evaluation of installed and overall operating costs as compared to conventional three cable per pipe systems installed in carbon steel pipes.« less
2000-06-28
KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building (O&C), an overhead crane hovers over the U.S. Lab, named Destiny, while workers attach cables for lifting the Lab. The Lab will undergo testing in the altitude chamber in the O&C. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research
2000-06-28
KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building (O&C), an overhead crane hovers over the U.S. Lab, named Destiny, while workers attach cables for lifting the Lab. The Lab will undergo testing in the altitude chamber in the O&C. Destiny is scheduled to fly on mission STS-98 in early 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, orbiter technicians are hooking a restraining cable around the orbiter lifting slings aft drop leg adjustment hand wheel. This is performed prior to disconnecting the aft spreader beam from the sling (the portion suspended by the 175 ton crane on the left side of the photo), and also prior to taking the final hang angle measurement of the orbiter prior to lifting it over the transom into the high bay. It will be mated with the Solid Rocket Boosters and External Tank already stacked there on the Mobile Launcher Platform. Atlantis is the designated orbiter for Return to Flight mission STS-121. The lighted planning window for launch extends from Sept. 9 to Sept. 25.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, orbiter technicians are hooking a restraining cable around the orbiter lifting slings aft drop leg adjustment hand wheel. This is performed prior to disconnecting the aft spreader beam from the sling (the portion suspended by the 175 ton crane on the left side of the photo), and also prior to taking the final hang angle measurement of the orbiter prior to lifting it over the transom into the high bay. It will be mated with the Solid Rocket Boosters and External Tank already stacked there on the Mobile Launcher Platform. Atlantis is the designated orbiter for Return to Flight mission STS-121. The lighted planning window for launch extends from Sept. 9 to Sept. 25.
29 CFR 1926.1425 - Keeping clear of the load.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Keeping clear of the load. 1926.1425 Section 1926.1425 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in...
Coordinated Control of a Planar Dual-Crane Non-Fully Restrained System
2008-12-01
Support Over-The-Shore (HSOTS) 2007 in Puerto Quetzal , Guatemala. . . . . . . . . . . . . . 30 Figure 27. Reference frame and coordinate definitions...2007 in Puerto Quetzal , Guatemala. 30 require the construction an inverse of the Jacobian, but rather the transpose only. It is noted that the effector
Measurement of water pressure and deformation with time domain reflectometry cables
NASA Astrophysics Data System (ADS)
Dowding, Charles H.; Pierce, Charles E.
1995-05-01
Time domain reflectometry (TDR) techniques can be deployed to measure water pressures and relative dam abutment displacement with an array of coaxial cables either drilled and grouted or retrofitted through existing passages. Application of TDR to dam monitoring requires determination of appropriate cable types and methods to install these cables in existing dams or during new construction. This paper briefly discusses currently applied and developing TDR techniques and describes initial design considerations for TDR-based dam instrumentation. Water pressure at the base of or within the dam can be determined by measuring the water level within a hollow or air-filled coaxial cable. The ability to retrofit existing porous stone-tipped piezometers is an attractive attribute of the TDR system. Measurement of relative lateral movement can be accomplished by monitoring local shearing of a solid polyethylene-filled coaxial cable at the interface of the dam base and foundation materials or along adversely oriented joints. Uplift can be recorded by measuring cable extension as the dam displaces upward off its foundation. Since each monitoring technique requires measurements with different types of coaxial cables, a variety may be installed within the array. Multiplexing of these cables will allow monitoring from a single pulser, and measurements can be recorded on site or remotely via a modem at any time.
Inexpensive high vacuum feedthroughs.
NASA Technical Reports Server (NTRS)
Gerber, S.; Post, D.
1973-01-01
Description of the use of rigid coaxial cable in the construction of high vacuum coaxial and coaxial push-pull rotary motion feedthroughs. This type of feedthroughs is shown to be extremely cheap and simple to make and modify. It can be used for moderately high voltages and provides a continuous, well shielded, low-noise feedthrough cable in any desired configuration.
Numerical modeling of a spherical buoy moored by a cable in three dimensions
NASA Astrophysics Data System (ADS)
Zhu, Xiangqian; Yoo, Wan-Suk
2016-05-01
Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the dynamics of the cables are considered in the construction of the numerical modeling. The cable modeling is established based on a new element frame through which the hydrodynamic loads are expressed efficiently. The accuracy of the cable modeling is verified with an experiment that is conducted by a catenary chain moving in a water tank. In addition, the modeling of a spherical buoy is established with respect to a spherical coordinate in three dimensions, which can suffers the gravity, the variable buoyancy and Froude-Krylov loads. Finally, the numerical modeling for the system of a spherical buoy moored by a cable is established, and a virtual simulation is proceeded with the X- and Y-directional linear waves and the X-directional current. The comparison with the commercial simulation code ProteusDS indicates that the system is accurately analyzed by the numerical modeling. The tensions within the cable, the motions of the system, and the relationship between the motions and waves are illustrated according to the defined sea state. The dynamics of the cables should be considered in analyzing the floating system of a spherical buoy moored by a cable.
A microcontroller-based three degree-of-freedom manipulator testbed. M.S. Thesis
NASA Technical Reports Server (NTRS)
Brown, Robert Michael, Jr.
1995-01-01
A wheeled exploratory vehicle is under construction at the Mars Mission Research Center at North Carolina State University. In order to serve as more than an inspection tool, this vehicle requires the ability to interact with its surroundings. A crane-type manipulator, as well as the necessary control hardware and software, has been developed for use as a sample gathering tool on this vehicle. The system is controlled by a network of four Motorola M68HC11 microcontrollers. Control hardware and software were developed in a modular fashion so that the system can be used to test future control algorithms and hardware. Actuators include three stepper motors and one solenoid. Sensors include three optical encoders and one cable tensiometer. The vehicle supervisor computer provides the manipulator system with the approximate coordinates of the target object. This system maps the workspace surrounding the given location by lowering the claw, along a set of evenly spaced vertical lines, until contact occurs. Based on this measured height information and prior knowledge of the target object size, the system determines if the object exists in the searched area. The system can find and retrieve a 1.25 in. diameter by 1.25 in. tall cylinder placed within the 47.5 sq in search area in less than 12 minutes. This manipulator hardware may be used for future control algorithm verification and serves as a prototype for other manipulator hardware.
46 CFR 108.601 - Crane design.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Crane design. 108.601 Section 108.601 Shipping COAST... Cranes Cranes § 108.601 Crane design. (a) Each crane and crane foundation on a unit must be designed in accordance with the American Petroleum Institute Specification for Offshore Cranes, API Spec. 2C, Second...
46 CFR 108.601 - Crane design.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Crane design. 108.601 Section 108.601 Shipping COAST... Cranes Cranes § 108.601 Crane design. (a) Each crane and crane foundation on a unit must be designed in accordance with the American Petroleum Institute Specification for Offshore Cranes, API Spec. 2C, Second...
Host–parasite behavioral interactions in a recently introduced, whooping crane population
King, Richard S.; McKann, Patrick C.; Gray, Brian R.; Putnam, Michael S.
2015-01-01
The whooping crane Grus americana has a long conservation history, but despite multiple attempts across North America, introduction success is lacking. Recently introduced, captively reared whooping cranes have had periods of poor reproductive performance in central Wisconsin that sometimes coincided with black fly (Diptera: Simuliidae) emergences. Sandhill crane Grus canadensis reproductive performance in central Wisconsin is approximately double that of whooping cranes. We used comfort behaviors as a measure of black fly harassment to infer whether behavioral differences existed between nesting sandhill cranes and nesting whooping cranes and between successful and unsuccessful whooping crane pairs. To further explore the interaction between black flies and incubating whooping cranes, we examined differences in behaviors between incubating birds and their off-nest mates. Compared to their off-nest mates, incubating whooping cranes exhibited elevated comfort behaviors, suggesting a bird at a nest may experience greater harassment from black flies. Sandhill cranes had elevated head-flicks over whooping cranes. Whooping cranes exhibited more head-rubs than sandhill cranes, and successful whooping crane pairs had elevated head-rubs over pairs that deserted their nests. Behavioral differences between sandhill cranes and whooping cranes as well as differences in reproductive performance, could be explained by exposure to local breeding conditions. Whereas sandhill cranes have nested in the area for hundreds, if not thousands, of years, whooping cranes were only recently introduced to the area. Behavioral differences between the species as well as those between successful and unsuccessful whooping crane pairs could also be explained by the effect of captive exposure, which could affect all whooping crane introductions.
Experimental Exploration of Metal Cable as Reinforcement in 3D Printed Concrete.
Bos, Freek P; Ahmed, Zeeshan Y; Jutinov, Evgeniy R; Salet, Theo A M
2017-11-16
The Material Deposition Method (MDM) is enjoying increasing attention as an additive method to create concrete mortar structures characterised by a high degree of form-freedom, a lack of geometrical repetition, and automated construction. Several small-scale structures have been realised around the world, or are under preparation. However, the nature of this construction method is unsuitable for conventional reinforcement methods to achieve ductile failure behaviour. Sometimes, this is solved by combining printing with conventional casting and reinforcing techniques. This study, however, explores an alternative strategy, namely to directly entrain a metal cable in the concrete filament during printing to serve as reinforcement. A device is introduced to apply the reinforcement. Several options for online reinforcement media are compared for printability. Considerations specific to the manufacturing process are discussed. Subsequently, pull-out tests on cast and printed specimens provide an initial characterisation of bond behaviour. Bending tests furthermore show the potential of this reinforcement method. The bond stress of cables in printed concrete was comparable to values reported for smooth rebar but lower than that of the same cables in cast concrete. The scatter in experimental results was high. When sufficient bond length is available, ductile failure behaviour for tension parallel to the filament direction can be achieved, even though cable slip occurs. Further improvements to the process should pave the way to achieve better post-crack resistance, as the concept in itself is feasible.
1999-05-27
NASA Administrator Daniel Goldin (left) greets Mme. Aline Chretien, wife of the Canadian Prime Minister, at the launch of STS-96. Looking on in the background (between them) is former astronaut Jean-Loup Chretien (no relation), who flew on STS-86. Mme. Chretien attended the launch because one of the STs-96 crew is Mission Specialist Julie Payette, who represents the Canadian Space Agency. Space Shuttle Discovery launched on time at 6:49:42 a.m. EDT to begin a 10-day logistics and resupply mission for the International Space Station. Along with such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment, Discovery carries about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission includes a space walk to attach the cranes to the outside of the ISS for use in future construction. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT
Unique Chernobyl Cranes for Deconstruction Activities in the New Safe Confinement - 13542
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parameswaran, N.A. Vijay; Chornyy, Igor; Owen, Rob
2013-07-01
The devastation left behind from the Chernobyl nuclear power plant (ChNPP) Unit 4 accident which occurred on April 26, 1986 presented unparalleled technical challenges to the world engineering and scientific community. One of the largest tasks that are in progress is the design and construction of the New Safe Confinement (NSC). The NSC is an engineered enclosure for the entire object shelter (OS) that includes a suite of process equipment. The process equipment will be used for the dismantling of the destroyed Chernobyl Nuclear Power Plant (ChNPP) Unit. One of the major mechanical handling systems to be installed in themore » NSC is the Main Cranes System (MCS). The planned decontamination and decommissioning or dismantling (D and D) activities will require the handling of heavily shielded waste disposal casks containing nuclear fuel as well as lifting and transporting extremely large structural elements. These activities, to be performed within the NSC, will require large and sophisticated cranes. The article will focus on the unique design features of the MCS for the D and D activities. (authors)« less
Cables and connectors for Large Space System Technology (LSST)
NASA Technical Reports Server (NTRS)
Dunbar, W. G.
1980-01-01
The effect of the environment and extravehicular activity/remote assembly operations on the cables and connectors for spacecraft with metallic and/or nonmetallic structures was examined. Cable and connector philosophy was outlined for the electrical systems and electronic compartments which contain high-voltage, high-power electrical and electronic equipment. The influence of plasma and particulates on the system is analyzed and the effect of static buildup on the spacecraft electrical system discussed. Conceptual cable and connector designs are assessed for capability to withstand high current and high voltage without danger of arcs and electromagnetic interference. The extravehicular activites required of the space station and/or supply spacecraft crew members to join and inspect the electrical system, using manual or remote assembly construction are also considered.
Monitoring of Carrying Cable in the Well by Electric Drive of Winch at the Logging Works
NASA Astrophysics Data System (ADS)
Odnokopylov, I. G.; Gneushev, V. V.; Larioshina, I. A.
2016-01-01
Emergency situations during logging operations are considered. The necessity of monitoring of the carrying cable in the well was shown, especially at the jet perforation and seismic researches of wells. The way of monitoring of logging cable and geophysical probe by means of the electric drive of tripping works of the logging winch is offered. This method allows timely to identify the wedges of geophysical equipment and the tension of the cable in well without interfering into construction of logging installation by means of algorithmic processing of sensors of electric drive. Research was conducted on the simulation model; these results indirectly confirm the possibility of using of electric drive for monitoring of downhole equipment.
29 CFR Appendix A to Subpart Cc of... - Standard Hand Signals
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Standard Hand Signals A Appendix A to Subpart CC of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in...
47. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW ...
47. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW OF "A" FACE (LEFT) WITH CLEANING SYSTEM INSTALLED (NOW REMOVED) AND "B" FACE (RIGHT) WITH CONSTRUCTION CRANE IN USE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Optical fiber cabling technologies for flexible access network
NASA Astrophysics Data System (ADS)
Tanji, Hisashi
2008-07-01
Fiber-to-the-home (FTTH) outside plant infrastructure should be so designed and constructed as to flexibly deal with increasing subscribers and system evolution to be expected in the future, taking minimization of total cost (CAPEX and OPEX) into consideration. With this in mind, fiber access architectures are reviewed and key technologies on optical fiber and cable for supporting flexible access network are presented. Low loss over wide wavelength (low water peak) and bend-insensitive single mode fiber is a future proof solution. Enhanced separable ribbon facilitates mid-span access to individual fibers in a cable installed, improving fiber utilizing efficiency and flexibility of distribution design. It also contributes to an excellent low PMD characteristic which could be required for video RF overlay system or high capacity long reach metro-access convergence network in the future. Bend-insensitive fiber based cabling technique including field installable connector greatly improves fiber/cable handling in installation and maintenance work.
Bertram, Miranda R; Hamer, Gabriel L; Hartup, Barry K; Snowden, Karen F; Medeiros, Matthew C; Hamer, Sarah A
2017-04-01
The population growth of endangered whooping cranes (Grus americana) is not consistent with species recovery goals, and the impact of parasite infection on whooping crane populations is largely unknown. Disease ecology and epidemiology research of endangered species is often hindered by limited ability to conduct invasive sampling on the target taxa. Accordingly, we hypothesized that sandhill cranes (Grus canadensis) would be a useful surrogate species to investigate the health impacts of Haemosporida infection in whooping cranes. Our goal was to compare the prevalence and diversity of Haemosporida infection between whooping cranes and sandhill cranes. We detected an overall infection prevalence of 83·6% (n = 61) in whooping cranes and 59·6% (n = 47) and 63·6 (n = 22) in two sympatric sandhill crane populations captured in Texas. Prevalence was significantly lower in allopatric sandhill cranes captured in New Mexico (12·1%, n = 33). Haemoproteus antigonis was the most abundant haemoparasite in cranes, present in 57·4% of whooping cranes and 39·2% of sandhill cranes; Plasmodium and Leucocytozoon were present at significantly lower levels. The high prevalence of Haemosporida in whooping cranes and sympatric sandhill cranes, with shared parasite lineages between the two species, supports sandhill cranes as a surrogate species for understanding health threats to endangered whooping cranes.
Dessauer, H.C.; Gee, G.F.; Rogers, J.S.
1992-01-01
Electrophoretic analysis of proteins yielded evidence on the relationships of species of cranes and on genetic diversity within populations of some species. Diversity within the Greater Sandhill crane and a Florida population of the Florida Sandhill crane was similar to that of most other vertebrates, but diversity was low in the Mississippi Sandhill crane, in the Okefenokee population of the Florida Sandhill crane, and within the Siberian and Sarus cranes. Diversity was surprisingly high among whooping cranes, whose number dropped to less than 25 early in this century. Phylogenetic analysis, using both character state and distance algorithms, yielded highly concordant trees for the 15 species. The African crowned cranes (Balearica) were widely divergent from all other cranes. Species of Anthropoides, Bugeranus, and Grus clustered closely but sorted into two lineages: a Whooper Group consisted of the whooping, common, hooded, black-necked, white-naped, and red-crowned cranes of genus Grus; and a Sandhill Group included the Sandhill, Siberian, Sarus, and Brolga cranes of genus Grus, the wattled crane of genus Bugeranus, and the Demoiselle and blue cranes of genus Anthropoides.
Book review: Sandhill and whooping cranes: Ancient voices over America's wetlands
Austin, Jane E.
2011-01-01
Paul Johnsgard has long been captivated by wild cranes and their unique vocalizations, courtship dances, and wide-ranging migrations. As a scientist and an admirer, Johnsgard has watched their migrations and behaviors for decades as hundreds of thousands of cranes staged each spring by the central Platte River, not far from his home in Lincoln, Nebraska. As an artist, he has skilfully captured their courtship dances and other behaviours in his exceptional line drawings. And, as an author, he has written extensively on their ecology in three earlier books: Cranes of the World (1983), Those of the Gray Wind: the Sandhill Crane (1986), and Crane Music: a Natural History of Cranes (1991). Much has happened relative to North American cranes in the 20 years since Johnsgard published Crane Music, including increased crane abundance in many areas and the completion of multiple studies on crane ecology and conservation. This new crane book serves as an update to Crane Music and provides the reader with many useful resources for observing and learning about cranes.
46 CFR 111.60-3 - Cable application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... IEEE 1580 must meet the provisions for cable application of section 24 of IEEE 45-2002 (both... incorporated by reference; see 46 CFR 110.10-1) must meet section 24 of IEEE 45-2002, except 24.6.1, 24.6.7... constructed according to IEEE 1580 must be applied in accordance with Table 25, Note 6, of IEEE 45-2002. (2...
Black Creek Hydro Project high-line cable penstock installation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fonnesbeck, K.C.; Ellicock, R.
1995-12-31
The Black Creek Hydro Project is a remote, high head, run-of-river, small hydro project located near Seattle, Washington. The comparatively small size of this project was not indicative of the difficulties and challenges presented to the design engineers and construction contractors involved in it`s completion. The most difficult of these challenges was the design and installation of a buried penstock on very steep and heavily forested terrain. This paper will concentrate on construction of the Black Creek penstock, and specifically, that portion of the penstock which required innovative application of a suspended {open_quotes}high-line{close_quotes} cable operation as used is commonly formore » logging of steep slopes. For this project, the cable installation and yarder equipment were utilized for a variety of purposes including, clearing and logging of the slope, to secure heavy equipment and machinery required to excavate the penstock trench, transport and placement of the individual pipe joints and finally to encase the pipe with lean concrete. The successful application of this approach contributed greatly to the timely completion of the project. This paper will offer background information on the selection and design of the cable Installation as well as highlights of the solutions that were developed to overcome the design and construction problems encountered. Finally, cost data will be offered to those who may be faced with similar undertakings caused by the steep and difficult sites attracting more attention in present days.« less
Bell, Jamie A.; Saikus, Christina E.; Ratnayaka, Kanishka; Barbash, Israel M.; Faranesh, Anthony Z.; Franson, Dominique N.; Sonmez, Merdim; Slack, Michael C.; Lederman, Robert J.; Kocaturk, Ozgur
2012-01-01
Purpose To develop an active delivery system that enhances visualization of nitinol cardiac occluder devices during deployment under real-time MRI. Materials and Methods We constructed an active delivery cable incorporating a loopless antenna and a custom titanium microscrew to secure the occluder devices. The delivery cable was tuned and matched to 50Ω at 64 MHz with the occluder device attached. We used real-time balanced SSFP in a wide-bore 1.5T scanner. Device-related images were reconstructed separately and combined with surface-coil images. The delivery cable was tested in vitro in a phantom and in vivo in swine using a variety of nitinol cardiac occluder devices. Results In vitro, the active delivery cable provided little signal when the occluder device was detached and maximal signal with the device attached. In vivo, signal from the active delivery cable enabled clear visualization of occluder device during positioning and deployment. Device release resulted in decreased signal from the active cable. Post-mortem examination confirmed proper device placement. Conclusions The active delivery cable enhanced the MRI depiction of nitinol cardiac occluder devices during positioning and deployment, both in conventional and novel applications. We expect enhanced visibility to contribute to effectiveness and safety of new and emerging MRI-guided treatments. PMID:22707441
Production of Aluminum Stabilized Superconducting Cable for the Mu2e Transport Solenoid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lombardo, Vito; Ambrosio, Giorgio; Evbota, Daniel
Here, the Fermilab Mu2e experiment, currently under construction at Fermilab, has the goal of measuring the rare process of direct muon to electron conversion in the field of a nucleus. The experiment features three large superconducting solenoids: the production solenoid (PS), the transport solenoid (TS), and the detector solenoid (DS). The TS is an “S-shaped” solenoid that sits in between the PS and the DS producing a magnetic field ranging between 2.5 and 2.0 T. This paper describes the various steps that led to the successful procurement of over 740 km of superconducting wire and 44 km of Al-stabilized Rutherfordmore » cable needed to build the 52 coils that constitute the Mu2e TS cold mass. The main cable properties and results of electrical and mechanical test campaigns are summarized and discussed. Critical current measurements of the Al-stabilized cables are presented and compared to expected critical current values as measured on extracted strands from the final cables after chemical etching of the aluminum stabilizer. A robust and reliable approach to cable welding is presented, and the effect of cable bending on the transport current is also investigated and presented.« less
Production of Aluminum Stabilized Superconducting Cable for the Mu2e Transport Solenoid
Lombardo, Vito; Ambrosio, Giorgio; Evbota, Daniel; ...
2018-01-15
Here, the Fermilab Mu2e experiment, currently under construction at Fermilab, has the goal of measuring the rare process of direct muon to electron conversion in the field of a nucleus. The experiment features three large superconducting solenoids: the production solenoid (PS), the transport solenoid (TS), and the detector solenoid (DS). The TS is an “S-shaped” solenoid that sits in between the PS and the DS producing a magnetic field ranging between 2.5 and 2.0 T. This paper describes the various steps that led to the successful procurement of over 740 km of superconducting wire and 44 km of Al-stabilized Rutherfordmore » cable needed to build the 52 coils that constitute the Mu2e TS cold mass. The main cable properties and results of electrical and mechanical test campaigns are summarized and discussed. Critical current measurements of the Al-stabilized cables are presented and compared to expected critical current values as measured on extracted strands from the final cables after chemical etching of the aluminum stabilizer. A robust and reliable approach to cable welding is presented, and the effect of cable bending on the transport current is also investigated and presented.« less
Olsen, Glenn H; Miller, Kimberli J; Docherty, Douglas E; Bochsler, Valerie S; Sileo, Louis
2009-06-01
West Nile virus was introduced into the United States in the vicinity of New York, New York, USA in 1999. The virus has since killed large numbers of birds nationwide, especially, but not limited to, crows (Corvus brachyrhinchos). One sandhill crane (Grus canadensis) at the Bridgeport Zoo (Bridgeport, Connecticut, USA) reportedly died from West Nile virus, so sandhill cranes and endangered whooping cranes (Grus americana), both in the wild and in captive breeding colonies at United States Geological Service (USGS) Patuxent Wildlife Research Center (Laurel, Maryland, USA) were considered at risk. A killed vaccine in sandhill cranes was evaluated by vaccinating and then challenging these cranes with live West Nile virus. No sandhill cranes inoculated with the killed vaccine developed significant titers when compared with unvaccinated controls. No sandhill cranes inoculated with the vaccine and challenged with the virus died from West Nile virus infection. In addition, no unvaccinated challenged sandhill cranes died. However, 2 days postchallenge, vaccinated cranes had significantly less viremia (P < 0.05) than unvaccinated cranes. Seven days postchallenge vaccinated cranes had significantly less cloacal shedding of the virus (P < 0.05) than unvaccinated cranes and significantly less weight loss (P < 0.05) as compared with unvaccinated cranes. Vaccinated sandhill cranes developed significantly higher titers 14 days postchallenge and were viremic for shorter periods of time after challenge than unvaccinated individuals. Unvaccinated challenged cranes had glial cell aggregates in both the brain and brain stem areas, and this was not observed in vaccinated challenged cranes or in vaccinated unchallenged cranes.
Olsen, Glenn H.; Miller, Kimberli J.; Docherty, Douglas E.; Shearn-Bochsler, Valerie I.; Sileo, Louis
2009-01-01
West Nile virus was introduced into the United States in the vicinity of New York, New York, USA in 1999. The virus has since killed large numbers of birds nationwide, especially, but not limited to, crows (Corvus brachyrhinchos). One sandhill crane (Grus canadensis) at the Bridgeport Zoo (Bridgeport, Connecticut, USA) reportedly died from West Nile virus, so sandhill cranes and endangered whooping cranes (Grus americana), both in the wild and in captive breeding colonies at United States Geological Service (USGS) Patuxent Wildlife Research Center (Laurel, Maryland, USA) were considered at risk. A killed vaccine in sandhill cranes was evaluated by vaccinating and then challenging these cranes with live West Nile virus. No sandhill cranes inoculated with the killed vaccine developed significant titers when compared with unvaccinated controls. No sandhill cranes inoculated with the vaccine and challenged with the virus died from West Nile virus infection. In addition, no unvaccinated challenged sandhill cranes died. However, 2 days postchallenge, vaccinated cranes had significantly less viremia (P < 0.05) than unvaccinated cranes. Seven days postchallenge vaccinated cranes had significantly less cloacal shedding of the virus (P < 0.05) than unvaccinated cranes and significantly less weight loss (P < 0.05) as compared with unvaccinated cranes. Vaccinated sandhill cranes developed significantly higher titers 14 days postchallenge and were viremic for shorter periods of time after challenge than unvaccinated individuals. Unvaccinated challenged cranes had glial cell aggregates in both the brain and brain stem areas, and this was not observed in vaccinated challenged cranes or in vaccinated unchallenged cranes.
46 CFR 108.601 - Crane design.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Crane design. 108.601 Section 108.601 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Cranes Cranes § 108.601 Crane design. (a) Each crane and crane foundation on a unit must be designed in accordance with the American Petroleum...
46 CFR 108.601 - Crane design.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Crane design. 108.601 Section 108.601 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Cranes Cranes § 108.601 Crane design. (a) Each crane and crane foundation on a unit must be designed in accordance with the American Petroleum...
NASA Astrophysics Data System (ADS)
Šouc, J.; Vojenčiak, M.; Gömöry, F.
2010-04-01
Several short cable models were constructed from YBCO coated conductor (YBCO CC) to study their basic dc and ac electrical properties. They were prepared using superconducting tapes helically wound on fiberglass former of different diameter (5, 8 and 10 mm) with different twist pitch (from 1.7 up to 2.4 cm). The number of parallel-connected tapes ranged from 1 up to 6. The standard length of the models was 11 cm. In one case a 35 cm long model has been manufactured in order to perform a bending test. We observed that the critical currents of the models were proportional to the number of tapes used for their construction. Transport and magnetization ac loss were measured at 36 and 72 Hz.
STS-128 EVA 3 Node 3 Tranquility Avionics Cable Routing OPS
2009-09-05
S128-E-007720 (5 Sept. 2009) --- NASA astronaut John “Danny” Olivas (left) and European Space Agency astronaut Christer Fuglesang, both STS-128 mission specialists, participate in the mission's third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the seven-hour, one-minute spacewalk, Olivas and Fuglesang deployed the Payload Attachment System (PAS), replaced the Rate Gyro Assembly #2, installed two GPS antennae and did some work to prepare for the installation of Node 3 next year. During connection of one of two sets of avionics cables for Node 3, one of the connectors could not be mated. This cable and connector were wrapped in a protective sleeve and safed. All other cables were mated successfully.
Analysis on the hot spot and trend of the foreign assembly building research
NASA Astrophysics Data System (ADS)
Bi, Xiaoqing; Luo, Yanbing
2017-03-01
First of all, the paper analyzes the research on the front of the assembly building in the past 15 years. This article mainly adopts the method of CO word analysis, construct the co word matrix, correlation matrix, and then into a dissimilarity matrix, and on this basis, using factor analysis, cluster analysis and multi scale analysis method to study the structure of prefabricated construction field display. Finally, the results of the analysis are discussed, and summarized the current research focus of foreign prefabricated construction mainly concentrated in 7 aspects: embankment construction, wood construction, bridge construction, crane layout, PCM wall and glass system, based on neural network test, energy saving and recycling, and forecast the future trend of development study.
Medical devices utilizing optical fibers for simultaneous power, communications and control
Fitch, Joseph P.; Matthews, Dennis L.; Hagans, Karla G.; Lee, Abraham P.; Krulevitch, Peter; Benett, William J.; Clough, Robert E.; DaSilva, Luiz B.; Celliers, Peter M.
2003-06-10
A medical device is constructed in the basic form of a catheter having a distal end for insertion into and manipulation within a body and a proximal end providing for a user to control the manipulation of the distal end within the body. A fiberoptic cable is disposed within the catheter and having a distal end proximate to the distal end of the catheter and a proximal end for external coupling of laser light energy. A laser-light-to-mechanical-power converter is connected to receive light from the distal end of the fiber optic cable and may include a photo-voltaic cell and an electromechanical motor or a heat-sensitive photo-thermal material. An electronic sensor is connected to receive electrical power from said distal end of the fiberoptic cable and is connected to provide signal information about a particular physical environment and communicated externally through the fiberoptic cable to the proximal end thereof. A mechanical sensor is attached to the distal end of the fiberoptic cable and connected to provide light signal information about a particular physical environment and communicated externally through the fiberoptic cable.
2009-02-01
power battery box and controllers, WiFi radio, network switch, vault seismometers, infrasonic digitizers, and excess cabling. In addition to the...installed around the boreholes. Immediately upon completion, each site will be cleared of all unused equipment, debris, materials, and trash . All...controllers, WiFi radio, network switch, vault seismometers, infrasonic digitizers, and excess cabling. In addition to the permanent infrastructure listed
Jingxin Wang; Chris B. LeDoux; Pam Edwards
2007-01-01
A harvesting system consisting of chainsaw felling and cable skidder extraction was studied to determine soil bulk density changes in a central Appalachian hardwood forest site. Soil bulk density was measured using a nuclear gauge preharvest and postharvest systematically across the harvest site, on transects across skid trails, and for a subset of skid trail transects...
46 CFR 111.60-1 - Construction and testing of cable.
Code of Federal Regulations, 2010 CFR
2010-10-01
... identification of either IEEE 1580, UL 1309, IEC 92-353, or NPFC MIL-C-24640A or NPFC MIL-C-24643A (all five... 110.10-1). (c) Medium-voltage electric cable must meet the requirements of IEEE 1580 and UL 1072... 1309, IEEE 1580, or section 8 of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1). (e...
Concrete structure construction on the Moon
NASA Technical Reports Server (NTRS)
Matsumoto, Shinji; Namba, Haruyuki; Kai, Yoshiro; Yoshida, Tetsuji
1992-01-01
This paper describes a precast prestressed concrete structure system on the Moon and erection methods for this system. The horizontal section of the structural module is hexagonal so that various layouts of the modules are possible by connecting the adjacent modules to each other. For erection of the modules, specially designed mobile cranes are used.
Fold in Origami and Unfold Math
ERIC Educational Resources Information Center
Georgeson, Joseph
2011-01-01
Students enjoy origami and like making everything from paper cranes to footballs out of small, colorful squares of paper. They can invent their own shapes and are intrigued by the polyhedrons that they can construct. Paper folding is fun, but where is the math? Unless teachers develop lessons that address mathematical objectives, origami could be…
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility is prepared to conduct a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
2010-10-27
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the 600-Ton Test Fixture outside the Launch Equipment Test Facility conducts a 500,000-pound pull test of a bridge crane lifting element, which is used to lift space shuttles in the Vehicle Assembly Building. The fixture proofload tests, in tension and compression, a variety of ground support equipment, including slings, lifting beams and other critical lifting hardware that require periodic proofloading. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, launch simulation towers and a cryogenic system. Photo credit: NASA/Jim Grossmann
Department of Energy Construction Safety Reference Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
DOE has adopted the Occupational Safety and Health Administration (OSHA) regulations Title 29 Code of Federal Regulations (CFR) 1926 ``Safety and Health Regulations for Construction,`` and related parts of 29 CFR 1910, ``Occupational Safety and Health Standards.`` This nonmandatory reference guide is based on these OSHA regulations and, where appropriate, incorporates additional standards, codes, directives, and work practices that are recognized and accepted by DOE and the construction industry. It covers excavation, scaffolding, electricity, fire, signs/barricades, cranes/hoists/conveyors, hand and power tools, concrete/masonry, stairways/ladders, welding/cutting, motor vehicles/mechanical equipment, demolition, materials, blasting, steel erection, etc.
Experimental Exploration of Metal Cable as Reinforcement in 3D Printed Concrete
Ahmed, Zeeshan Y.; Jutinov, Evgeniy R.; Salet, Theo A. M.
2017-01-01
The Material Deposition Method (MDM) is enjoying increasing attention as an additive method to create concrete mortar structures characterised by a high degree of form-freedom, a lack of geometrical repetition, and automated construction. Several small-scale structures have been realised around the world, or are under preparation. However, the nature of this construction method is unsuitable for conventional reinforcement methods to achieve ductile failure behaviour. Sometimes, this is solved by combining printing with conventional casting and reinforcing techniques. This study, however, explores an alternative strategy, namely to directly entrain a metal cable in the concrete filament during printing to serve as reinforcement. A device is introduced to apply the reinforcement. Several options for online reinforcement media are compared for printability. Considerations specific to the manufacturing process are discussed. Subsequently, pull-out tests on cast and printed specimens provide an initial characterisation of bond behaviour. Bending tests furthermore show the potential of this reinforcement method. The bond stress of cables in printed concrete was comparable to values reported for smooth rebar but lower than that of the same cables in cast concrete. The scatter in experimental results was high. When sufficient bond length is available, ductile failure behaviour for tension parallel to the filament direction can be achieved, even though cable slip occurs. Further improvements to the process should pave the way to achieve better post-crack resistance, as the concept in itself is feasible. PMID:29144426
Unique and massive Chernobyl cranes for deconstruction activities in the new safe confinement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parameswaran, N. A. Vijay; Chornyy, Igor; Owen, Rob
2013-07-01
On 26 April 1986, the worst nuclear power plant accident in history occurred at the Chernobyl plant in Ukraine (then part of the Soviet Union). The destruction of Unit 4 sent highly radioactive fallout over Belarus, Russia, Ukraine, and Europe. The object shelter-a containment sarcophagus-was built in November 1986 to limit exposure to radiation. However, it has only a planned 25-year lifespan and would probably not survive even a moderate seismic event in a region that has more than its share of such events. It was time to take action. One of the largest tasks that are in progress ismore » the design and construction of the New Safe Confinement (NSC). The NSC is an engineered enclosure for the entire object shelter that includes a suite of process equipment. The process equipment will be used for the dismantling of the destroyed Chernobyl Nuclear Power Plant Unit. One of the major mechanical handling systems to be installed in the new safe confinement is the Main Cranes System. The planned decontamination and decommissioning or dismantling activities will require the handling of heavily shielded waste disposal casks containing nuclear fuel as well as lifting and transporting extremely large structural elements. These activities, to be performed within the new safe confinement, will require large and sophisticated cranes. The article will focus on the current progress of the new safe confinement and of the main cranes system for the decommissioning or dismantling activities. (authors)« less
Forrester, Donald J.; Carpenter, J.W.; Blankinship, D.R.
1978-01-01
Coccidial oocysts were observed in 6 of 19 fecal samples from free-ranging whooping cranes (Grus americana) and 4 of 16 samples from captive whooping cranes. Eimeria gruis occurred in four free-ranging whooping cranes and E. reichenowi in two free-ranging and two captive whooping cranes. Fecal samples from two captive cranes contained oocysts of Isospora lacazei which was considered a spurious parasite. Oocysts of both species of Eimeria were prevalent in fecal samples collected from three free-ranging Canadian sandhill cranes (G. canadensis rowani) from whooping crane wintering grounds in Texas. These coccidia were prevalent also in fecal samples from 14 sandhill cranes (of 4 subspecies) maintained in captivity at the Patuxent Wildlife Research Center in Maryland.
SHAO, Ming-Qin; GUO, Hong; JIANG, Jian-Hong
2014-01-01
Both the Siberian Crane (Leucogeranus leucogeranus) and Hooded Crane (Grus monacha) have limited population sizes and are considered endangered by domestic Chinese and international agencies. To document the current size of their respective populations and characterize their groups, between October 2012 and April 2013 we undertook fieldwork at four nature reserve areas within the Poyang Lake wetlands. We divided Poyanghu National Nature Reserve (PYH) into the Wucheng (PWC) and Hengfeng areas (PHF), because each are each located in different counties. Our fieldwork showed that the Siberian Crane occurred mainly in PYH (364 in the PHF, 158 in the PWC) and the Nanjishan Wetland National Nature Reserve (NJS, with 200 individuals). The Hooded Crane was mainly distributed in PYH (302 in the PHF and 154 in the PWC). Family groups accounted for more than 50% of the total number of groups among both species, with Hooded Cranes forming more family groups than Siberian Cranes. Typically, these groups were formed of two adults with one offspring (Siberian Crane), and two adults with two offspring (Hooded Crane), with the mean family group size of the Siberian Crane and Hooded Crane being respectively 2.65±0.53 (n=43) and 3.09±0.86 (n=47) individuals per group. The mean collective group size of the Siberian Crane and Hooded Crane included 28.09±24.94 (n=23) and 28.94±27.97 (n=16) individuals per group, respectively, with the proportion of juveniles among Hooded Cranes being more than double that seen among the Siberian Cranes. PMID:25297076
DOE Office of Scientific and Technical Information (OSTI.GOV)
van der Laan, D. C.; Noyes, P. D.; Miller, G. E.
2013-02-13
The next generation of high-ï¬eld magnets that will operate at magnetic ï¬elds substantially above 20 T, or at temperatures substantially above 4.2 K, requires high-temperature superconductors (HTS). Conductor on round core (CORC) cables, in which RE-Ba{sub 2}Cu{sub 3}O{sub 7-{delta}} (RE = rare earth) (REBCO) coated conductors are wound in a helical fashion on a flexible core, are a practical and versatile HTS cable option for low-inductance, high-field magnets. We performed the first tests of CORC magnet cables in liquid helium in magnetic fields of up to 20 T. A record critical current I{sub c} of 5021 A was measured atmore » 4.2 K and 19 T. In a cable with an outer diameter of 7.5 mm, this value corresponds to an engineering current density J{sub e} of 114 A mm{sup -2} , the highest J{sub e} ever reported for a superconducting cable at such high magnetic fields. Additionally, the first magnet wound from an HTS cable was constructed from a 6 m-long CORC cable. The 12-turn, double-layer magnet had an inner diameter of 9 cm and was tested in a magnetic field of 20 T, at which it had an I{sub c} of 1966 A. The cables were quenched repetitively without degradation during the measurements, demonstrating the feasibility of HTS CORC cables for use in high-field magnet applications.« less
Long-term monitoring FBG-based cable load sensor
NASA Astrophysics Data System (ADS)
Zhang, Zhichun; Zhou, Zhi; Wang, Chuan; Ou, Jinping
2006-03-01
Stay cables are the main load-bearing components of stayed-cable bridges. The cables stress status is an important factor to the stayed-cable bridge structure safety evaluation. So it's very important not only to the bridge construction, but also to the long-term safety evaluation for the bridge structure in-service. The accurate measurement for cable load depends on an effective sensor, especially to meet the long time durability and measurement demand. FBG, for its great advantage of corrosion resistance, absolute measurement, high accuracy, electro-magnetic resistance, quasi-distribution sensing, absolute measurement and so on, is the most promising sensor, which can cater for the cable force monitoring. In this paper, a load sensor has been developed, which is made up of a bushing elastic supporting body, 4 FBGs uniformly-spaced attached outside of the bushing supporting body, and a temperature compensation FBG for other four FBGs, moreover a cover for protection of FBGs. Firstly, the sensor measuring principle is analyzed, and relationship equation of FBG wavelength shifts and extrinsic load has also been gotten. And then the sensor calibration experiments of a steel cable stretching test with the FBG load sensor and a reference electric pressure sensor is finished, and the results shows excellent linearity of extrinsic load and FBG wavelength shifts, and good repeatability, which indicates that such kind of FBG-based load sensor is suitable for load measurement, especially for long-term, real time monitoring of stay-cables.
Use of a helicopter to capture flighted cranes
Ellis, D.H.; Hjertaas, D.; Johns, B.W.; Urbanek, R.P.
1998-01-01
Using a helicopter, we pursued 12 sandhill cranes (Grus canadensis) and captured 6. In forested habitat, cranes could be forced down, but we were unable to deploy the pursuit team, so cranes could not be captured. In open habitat, every crane we pursued was captured. Target cranes were forced to the ground in 0.3-14 minutes. Adjusting pursuit distance (50-150 m) was essential in promoting fatigue and in preventing escape of target cranes.
The Development and Demonstration of a 360m/10 kA HTS DC Power Cable
NASA Astrophysics Data System (ADS)
Xiao, Liye
With the quick development of renewable energy, it is expected that the electric power from renewable energy would be the dominant one for the future power grid. Due to the specialty of the renewable energy, the HVDC power transmission would be very useful for the transmission of electric power from renewable energy. DC power cable made of High Tc Superconductor (HTS) would be a possible alternative for the construction of HVDC power transmission system. In this chapter, we report the development and demonstration of a 360 m/10 kA HTS DC power cable and the test results.
Properties of plastic tapes for cryogenic power cable insulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muller, A C
1978-01-01
A superconducting ac power transmission cable is under development at Brookhaven National Laboratory (BNL). This project was undertaken in 1972 in response to growing national power requirements. The goal of this program is to develop an underground power transmission system suitable for transferring bulk quantities of electricity over distances of 16 to 160 km. Both the capital investment and operating costs must be low enough to make the system attractive to the electric utilities. The superconducting cable shares the advantages with conventional underground cables of needing only a few feet of right-of-way width rather than the large tracts of increasinglymore » expensive land required for conventional aerial transmission. Recent cost analysis studies show that superconducting cables, although more expensive than aerial transmission, will probably be competitive with other methods of underground transmission at loads greater than 2000 MVA. Initial design studies showed that a flexible, forced-cooled cable offered the best combination of technical and economic features. A helium cooled cable with Nb/sub 3/Sn superconductor was chosen as the BNL design. The present goal of the BNL program is the construction of a 100 meter outdoor three-phase ac cable rated at 138 kV and 1000 MVA. The refrigerator and the 100 m-long dewar are already installed. Terminations and cables are under design, and it is planned to begin installation of the first single phase cable in 1979. If the results on this model show promise for eventual commercial use, cables of higher voltage and power rating will be developed. One fundamental phase of this project; the development of the required insulating materials, is described.« less
STS-96 crew members in the white room are prepared for entry into Discovery
NASA Technical Reports Server (NTRS)
1999-01-01
STS-96 Mission Specialist Ellen Ochoa chats with white room closeout crew members while being checked out for entry into the orbiter Discovery. At left are Mechanical Technicians Al Schmidt and Chris meinert; at right is Quality Assurance Specialist James Davis and Closeout Chief Travis Thompson. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10- day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student- involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT.
STS-96 Crew Breakfast in O&C Building before launch
NASA Technical Reports Server (NTRS)
1999-01-01
The STS-96 crew gathers in the early morning for a snack in the Operations and Checkout Building before suiting up for launch. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Seated from left are Mission Specialists Daniel T. Barry and Ellen Ochoa, Pilot Rick D. Husband, Mission Commander Kent V. Rominger, and Mission Specialists Julie Payette, Valery Ivanovich Tokarev, and Tamara E. Jernigan. Tokarev represents the Russian Space Agency and Payette the Canadian Space Agency. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student- involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT.
PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...
PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO SOUTH OF SOUTHERN TRAVELING FORMWORK AND CABLE STAY TOWER. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR
Radiation Dose Testing on Juno High Voltage Cables
NASA Technical Reports Server (NTRS)
Green, Nelson W.; Kirkham, Harold; Kim, Wousik; McAlpine, Bill
2008-01-01
The Juno mission to Jupiter will have a highly elliptical orbit taking the spacecraft through the radiation belts surrounding the planet. During these passes through the radiation belts, the spacecraft will be subject to high doses of radiation from energetic electrons and protons with energies ranging from 10 keV to 1 GeV. While shielding within the spacecraft main body will reduce the total absorbed dose to much of the spacecraft electronics, instruments and cables on the outside of the spacecraft will receive much higher levels of absorbed dose. In order to estimate the amount of degradation to two such cables, testing has been performed on two coaxial cables intended to provide high voltages to three of the instruments on Juno. Both cables were placed in a vacuum of 5x10(exp -6) torr and cooled to -50(deg)C prior to exposure to the radiation sources. Measurements of the coaxial capacitance per unit length and partial discharge noise floor indicate that increasing levels of radiation make measurable but acceptably small changes to the F EP Teflon utilized in the construction of these cables. In addition to the radiation dose testing, observations were made on the internal electrostatic charging characteristics of these cables and multiple discharges were recorded.
Radiation Dose Testing on Juno High Voltage Cables
NASA Technical Reports Server (NTRS)
Green, Nelson W.; Kirkham, Harold; Kim, Wousik; McAlpine, Bill
2008-01-01
The Juno mission to Jupiter will have a highly elliptical orbit taking the spacecraft through the radiation belts surrounding the planet. During these passes through the radiation belts, the spacecraft will be subject to high doses of radiation from energetic electrons and protons with energies ranging from 10 keV to 1 GeV. While shielding within the spacecraft main body will reduce the total absorbed dose to much of the spacecraft electronics, instruments and cables on the outside of the spacecraft will receive much higher levels of absorbed dose. In order to estimate the amount of degradation to two such cables, testing has been performed on two coaxial cables intended to provide high voltages to three of the instruments on Juno. Both cables were placed in a vacuum of 5x10-6 torr and cooled to -50 C prior to exposure to the radiation sources. Measurements of the coaxial capacitance per unit length and partial discharge noise floor indicate that increasing levels of radiation make measurable but acceptably small changes to the F EP Teflon utilized in the construction of these cables. In addition to the radiation dose testing, observations were made on the internal electrostatic charging characteristics of these cables and multiple discharges were recorded.
A Historical Analysis of Crane Mishaps at Kennedy Space Center
NASA Technical Reports Server (NTRS)
Wolfe, Crystal
2014-01-01
Cranes and hoists are widely used in many areas. Crane accidents and handling mishaps are responsible for injuries, costly equipment damage, and program delays. Most crane accidents are caused by preventable factors. Understanding these factors is critical when designing cranes and preparing lift plans. Analysis of previous accidents provides insight into current recommendations for crane safety. Cranes and hoists are used throughout Kennedy Space Center to lift everything from machine components to critical flight hardware. Unless they are trained crane operators, most NASA employees and contractors do not need to undergo specialized crane training and may not understand the safety issues surrounding the use of cranes and hoists. A single accident with a crane or hoist can injure or kill people, cause severe equipment damage, and delay or terminate a program. Handling mishaps can also have a significant impact on the program. Simple mistakes like bouncing or jarring a load, or moving the crane down when it should go up, can damage fragile flight hardware and cause major delays in processing. Hazardous commodities (high pressure gas, hypergolic propellants, and solid rocket motors) can cause life safety concerns for the workers performing the lifting operations. Most crane accidents are preventable with the correct training and understanding of potential hazards. Designing the crane with human factors taken into account can prevent many accidents. Engineers are also responsible for preparing lift plans where understanding the safety issues can prevent or mitigate potential accidents. Cranes are widely used across many areas of KSC. Failure of these cranes often leads to injury, high damage costs, and significant delays in program objectives. Following a basic set of principles and procedures during design, fabrication, testing, regular use, and maintenance can significantly minimize many of these failures. As the accident analysis shows, load drops are often caused or influenced by human factors. Therefore, proper training and understanding of crane safety throughout the workforce is critical. It is important that the engineers designing the cranes, lift planners preparing the lift plans, operators performing the lifts, and training officers conducting the operator training all understand the problems that can happen with cranes and how to ensure the safety of the workforce and equipment being lifted.
Teraoka, Hiroki; Miyagi, Hasumi; Haraguchi, Yuko; Takase, Kozo; Kitazawa, Takio; Noda, Jun
2018-05-31
The hooded crane is designated as an endangered species. The cranes breed primarily in wetlands in southeast Russia and China in summer. Most of the hooded crane population winters in the Izumi plain in Japan. It is difficult to know the contamination status of their habitat because of their vast breeding area. We determined the levels of Cd, Pb, As, (total) Hg, Se, Zn, and Cu in the liver, kidney, and muscle of hooded cranes that were found dead in Izumi in the periods 2003-2006 and 2014-2015 compared with the levels in red-crowned cranes in Hokkaido, Japan, as the only cranes in which these elements had been studied extensively. There were no notable differences between levels of the seven elements in the two periods. Overall, tissue levels of the elements examined in hooded cranes were comparable to those in red-crowned cranes except for Hg and Se. Tissue levels of Hg and Se were clearly lower in hooded cranes than in red-crowned cranes that were found dead from 2000. One lead poisoning case was confirmed. The results suggest that Hooded cranes wintering in Izumi are not extensively contaminated with the seven elements examined.
26 CFR 41.4482(b)-1 - Definition of taxable gross weight.
Code of Federal Regulations, 2011 CFR
2011-04-01
... or for use in the maintenance of the vehicle; and a full complement of lubricants, fuel, and water... compressor, crane, specialized oilfield machinery, etc.) mounted on the vehicle for use on construction jobs... vehicle by means of its own motor, for use in the maintenance of the vehicle, or for the accommodation of...
Manned remote work station development article
NASA Technical Reports Server (NTRS)
1978-01-01
Flight article and associated design concepts are evaluated to meet fundamental requirements of a universal crew cabin to be used as a construction cherrypicker, a space crane turret, a railed work station, or a free flyer. Key technology developments are embodied into a simulation program. A schedule and simulation test plan matrix is given for the open cabin cherry picker.
Ryu, Hodon; Lu, Jingrang; Vogel, Jason; Elk, Michael; Chávez-Ramírez, Felipe; Ashbolt, Nicholas
2012-01-01
While the microbial water quality in the Platte River is seasonally impacted by excreta from migrating cranes, there are no methods available to study crane fecal contamination. Here we characterized microbial populations in crane feces using phylogenetic analysis of 16S rRNA gene fecal clone libraries. Using these sequences, a novel crane quantitative PCR (Crane1) assay was developed, and its applicability as a microbial source tracking (MST) assay was evaluated by determining its host specificity and detection ability in environmental waters. Bacteria from crane excreta were dominated by bacilli and proteobacteria, with a notable paucity of sequences homologous to Bacteroidetes and Clostridia. The Crane1 marker targeted a dominant clade of unclassified Lactobacillales sequences closely related to Catellicoccus marimammalium. The host distribution of the Crane1 marker was relatively high, being positive for 69% (66/96) of the crane excreta samples tested. The assay also showed high host specificity, with 95% of the nontarget fecal samples (i.e., n = 553; 20 different free-range hosts) being negative. Of the presumed crane-impacted water samples (n = 16), 88% were positive for the Crane1 assay, whereas none of the water samples not impacted by cranes were positive (n = 165). Bayesian statistical models of the Crane1 MST marker demonstrated high confidence in detecting true-positive signals and a low probability of false-negative signals from environmental water samples. Altogether, these data suggest that the newly developed marker could be used in environmental monitoring studies to study crane fecal pollution dynamics. PMID:22492437
NASA Astrophysics Data System (ADS)
van Velden, Julia L.; Smith, Tanya; Ryan, Peter G.
2016-12-01
The Western Cape population of Blue Cranes ( Anthropoides paradiseus) in South Africa is of great importance as the largest population throughout its range. However, Blue Cranes are strongly associated with agricultural lands in the Western Cape, and therefore may come into conflict with farmers who perceive them as damaging to crops. We investigated the viability of this population by exploring farmer attitudes toward crane damage in two regions of the Western Cape, the Swartland and Overberg, using semi-structured interviews. Perceptions of cranes differed widely between regions: farmers in the Swartland perceived crane flocks to be particularly damaging to the feed crop sweet lupin (65 % of farmers reported some level of damage by cranes), and 40 % of these farmers perceived cranes as more problematic than other common bird pests. Farmers in the Overberg did not perceive cranes as highly damaging, although there was concern about cranes eating feed at sheep troughs. Farmers who had experienced large flocks on their farms and farmers who ranked cranes as more problematic than other bird pests more often perceived cranes to be damaging to their livelihoods. Biographical variables and crop profiles could not be related to the perception of damage, indicating the complexity of this human-wildlife conflict. Farmers' need for management alternatives was related to the perceived severity of damage. These results highlight the need for location-specific management solutions to crop damage by cranes, and contribute to the management of this vulnerable species.
30 CFR 28.40 - Construction and performance requirements; general.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology...; general. 28.40 Section 28.40 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Construction, Performance, and Testing Requirements...
30 CFR 28.40 - Construction and performance requirements; general.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology...; general. 28.40 Section 28.40 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Construction, Performance, and Testing Requirements...
30 CFR 28.40 - Construction and performance requirements; general.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology...; general. 28.40 Section 28.40 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Construction, Performance, and Testing Requirements...
30 CFR 28.40 - Construction and performance requirements; general.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Department of Labor, Mine Safety and Health Administration, Approval and Certification Center, 765 Technology...; general. 28.40 Section 28.40 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Construction, Performance, and Testing Requirements...
Characterization of gizzards and grits of wild cranes found dead at Izumi Plain in Japan
UEGOMORI, Mima; HARAGUCHI, Yuko; OBI, Takeshi; TAKASE, Kozo
2018-01-01
We analyzed the gizzards, and grits retained in the gizzards of 41 cranes that migrated to the Izumi Plain during the winter of 2015/2016 and died there, either due to accident or disease. These included 31 Hooded Cranes (Grus monacha) and 10 White-naped Cranes (G. vipio). We determined body weight, gizzard weight, total grit weight and number per gizzard, and size, shape, and surface roundness of the grits. Average gizzard weights were 92.4 g for Hooded Cranes and 97.1 g for White-naped Cranes, and gizzard weight positively correlated with body weight in both species. Average total grit weights per gizzard were 19.7 g in Hooded Cranes and 25.7 g in White-naped Cranes, and were significantly higher in the latter. Average percentages of body weight to grit weight were 0.8% in Hooded Cranes and 0.5% in White-naped Cranes. Average grit number per gizzard was 693.5 in Hooded Cranes and 924.2 in White-naped Cranes, and were significantly higher in the latter. The average grit size was 2.8 mm in both species. No differences were found in the shape and surface roundness of grits between the two species. To the best of our knowledge, this is the first study on the grits retained in the gizzards of Hooded and White-naped Cranes. PMID:29503349
Characterization of gizzards and grits of wild cranes found dead at Izumi Plain in Japan.
Uegomori, Mima; Haraguchi, Yuko; Obi, Takeshi; Takase, Kozo
2018-04-18
We analyzed the gizzards, and grits retained in the gizzards of 41 cranes that migrated to the Izumi Plain during the winter of 2015/2016 and died there, either due to accident or disease. These included 31 Hooded Cranes (Grus monacha) and 10 White-naped Cranes (G. vipio). We determined body weight, gizzard weight, total grit weight and number per gizzard, and size, shape, and surface roundness of the grits. Average gizzard weights were 92.4 g for Hooded Cranes and 97.1 g for White-naped Cranes, and gizzard weight positively correlated with body weight in both species. Average total grit weights per gizzard were 19.7 g in Hooded Cranes and 25.7 g in White-naped Cranes, and were significantly higher in the latter. Average percentages of body weight to grit weight were 0.8% in Hooded Cranes and 0.5% in White-naped Cranes. Average grit number per gizzard was 693.5 in Hooded Cranes and 924.2 in White-naped Cranes, and were significantly higher in the latter. The average grit size was 2.8 mm in both species. No differences were found in the shape and surface roundness of grits between the two species. To the best of our knowledge, this is the first study on the grits retained in the gizzards of Hooded and White-naped Cranes.
NASA Technical Reports Server (NTRS)
1983-01-01
Thomas & Betts Corporation's Flat Conductor Cables, or FCC, were developed of necessity as aircraft and spacecraft became increasingly complex. In order to reduce size and weight of components, the use of thin flat wire instead of relatively thick and protrusive round cable, provided a dramatic reduction of the space occupied by the many miles of power distribution lines in an aerospace vehicle. Commercially, FCC offers cost savings in simplified building construction, reduced installation time and ease of alteration.
Series Transmission Line Transformer
Buckles, Robert A.; Booth, Rex; Yen, Boris T.
2004-06-29
A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.
9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications ...
9. "TEST STAND; STRUCTURAL; CABLE TUNNEL, PLAN, SECTIONS, DETAILS." Specifications No. OC1-55-72-(Rev.); Drawing No. 60-09-12; sheet 43 of 148; file no. AF 1320/94, Rev. A. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Hoar, Bryanne M; Whiteside, Douglas P; Ward, Linda; Douglas Inglis, G; Morck, Douglas W
2007-03-01
The enteric flora of captive whooping cranes (Grus americana) and sandhill cranes (Grus canadensis) has not been well described, despite its potential importance in the understanding of both the normal condition of the intestinal physiology of these animals and the altered colonization within disease states in these birds. Nineteen whooping cranes and 23 sandhill cranes housed currently at the Calgary Zoo or its affiliated Devonian Wildlife Conservation Centre (DWCC) in Calgary, Alberta were sampled from October 2004-February 2005 by collecting aerobic and anaerobic cloacal swabs from each bird. There were seven major groupings of bacteria isolated from both species of crane. Gram-positive cocci, coliforms, and gram-negative bacilli were the most prevalent types of bacteria isolated for both crane species, with Escherichia coli, Enterococcus faecalis, and Streptococcus Group D, not Enterococcus the bacterial species isolated most commonly. There was a significant difference in the average number of isolates per individual between the two crane species but no differences between age or gender categories within crane species. Campylobacter sp. were isolated from five whooping cranes. The potential zoonotic pathogen Campylobacter jejuni was isolated from one whooping crane and C. upsaliensis was isolated from a second. Three other isolates were unspeciated members of the Campylobacter genus and likely belong to a species undescribed previously. The evaluation of the enteric cloacal flora of whooping cranes and sandhill cranes illustrates that differences exist between these two closely related crane species, and highlights the potential implications these differences may have for current practices involving captive wildlife. Zoo Biol 0:1-13, 2007. (c) 2007 Wiley-Liss, Inc.
NASA Astrophysics Data System (ADS)
Jaros, Jakub; Liner, Andrej; Papes, Martin; Vasinek, Vladimir; Mach, Veleslav; Hruby, David; Kajnar, Tomas; Perecar, Frantisek
2015-01-01
Nowadays, the power cables are manufactured to fulfill the following condition - the highest allowable temperature of the cable during normal operation and the maximum allowable temperature at short circuit conditions cannot exceed the condition of the maximum allowable internal temperature. The distribution of the electric current through the conductor leads to the increase of the amplitude of electrons in the crystal lattice of the cables material. The consequence of this phenomenon is the increase of friction and the increase of collisions between particles inside the material, which causes the temperature increase of the carrying elements. The temperature increase is unwanted phenomena, because it is causing losses. In extreme cases, the long-term overload leads to the cable damaging or fire. This paper deals with the temperature distribution measurement inside the power cables using distributed temperature system. With cooperation with Kabex company, the tube containing optical fibers was installed into the center of power cables. These fibers, except telecommunications purposes, can be also used as sensors in measurements carrying out with distributed temperature system. These systems use the optical fiber as a sensor and allow the continual measurement of the temperature along the whole cable in real time with spatial resolution 1 m. DTS systems are successfully deployed in temperature measurement applications in industry areas yet. These areas include construction, drainage, hot water etc. Their advantages are low cost, resistance to electromagnetic radiation and the possibility of real time monitoring at the distance of 8 km. The location of the optical fiber in the center of the power cable allows the measurement of internal distribution of the temperature during overloading the cable. This measurement method can be also used for prediction of short-circuit and its exact location.
Ionizing radiation effects on ISS ePTFE jacketed cable assembly
NASA Astrophysics Data System (ADS)
Koontz, S. L.; Golden, J. L.; Lorenz, M. J.; Pedley, M. D.
2003-09-01
Polytetrafluoroethylene (PTFE), which is susceptible to embrittlement by ionizing radiation, is used as a primary material in the Mobile Transporter's (MT) Trailing Umbilical System (TUS) cable on the International Space Station (ISS). The TUS cable provides power and data service between the ISS truss and the MT. The TUS cable is normally stowed in an uptake reel and is fed out to follow the MT as it moves along rails on the ISS truss structure. For reliable electrical and mechanical performance, TUS cable polymeric materials must be capable of >3.5% elongation without cracking or breaking. The MT TUS cable operating temperature on ISS is expected to range between -100°C and +130°C. The on-orbit functional life requirement for the MT TUS cable is 10 years. Analysis and testing were performed to verify that the MT TUS cable would be able to meet full-life mechanical and electrical performance requirements, despite progressive embrittlement by the natural ionizing radiation environment. Energetic radiation belt electrons (trapped electrons) are the principal contributor to TUS cable radiation dose. TUS cable specimens were irradiated, in vacuum, with both energetic electrons and gamma rays. Electron beam energy was chosen to minimize charging effects on the non-conductive ePTFE (expanded PTFE) targets. Tensile testing was then performed, over the expected range of operating temperatures, as a function of radiation dose. When compared to the expected in-flight radiation dose/depth profile, atomic oxygen (AO) erosion of the radiation damaged TUS cable jacket surfaces is more rapid than the development of radiation induced embrittlement of the same surfaces. Additionally, the layered construction of the jacket prevents crack growth propagation, leaving the inner layer material compliant with the design elongation requirements. As a result, the TUS cable insulation design was verified to meet performance life requirements.
Biomechanical analysis of a novel hook-screw technique for C1-2 stabilization.
Reis, Marco Túlio; Nottmeier, Eric W; Reyes, Phillip M; Baek, Seungwon; Crawford, Neil R
2012-09-01
The Food and Drug Administration has not cleared the following medical devices for the use described in this study. The following medical devices are being discussed for an off-label use: cervical lateral mass screws. As an alternative for cases in which the anatomy and spatial relationship between C-2 and a vertebral artery precludes insertion of C-2 pedicle/pars or C1-2 transarticular screws, a technique that includes opposing laminar hooks (claw) at C-2 combined with C-1 lateral mass screws may be used. The biomechanical stability of this alternate technique was compared with that of a standard screw-rod technique in vitro. Flexibility tests were performed in 7 specimens (occiput to C-3) in the following 6 different conditions: 1) intact; 2) after creating instability and attaching a posterior cable/graft at C1-2; 3) after removing the graft and attaching a construct comprising C-1 lateral mass screws and C-2 laminar claws; 4) after reattaching the posterior cable-graft at C1-2 (posterior hardware still in place); 5) after removing the posterior cable-graft and laminar hooks and placing C-2 pedicle screws interconnected to C-1 lateral mass screws via rod; and 6) after reattaching the posterior cable-graft at C1-2 (screw-rod construct still in place). All types of stabilization significantly reduced the range of motion, lax zone, and stiff zone compared with the intact condition. There was no significant biomechanical difference in terms of range of motion or lax zone between the screw-rod construct and the screw-claw-rod construct in any direction of loading. The screw-claw-rod technique restricts motion much like the standard Harms technique, making it an acceptable alternative technique when aberrant arterial anatomy precludes the placement of C-2 pars/pedicle screws or C1-2 transarticular screws.
Human Factors Engineering Guidelines for Overhead Cranes
NASA Technical Reports Server (NTRS)
Chandler, Faith; Delgado, H. (Technical Monitor)
2001-01-01
This guideline provides standards for overhead crane cabs that can be applied to the design and modification of crane cabs to reduce the potential for human error due to design. This guideline serves as an aid during the development of a specification for purchases of cranes or for an engineering support request for crane design modification. It aids human factors engineers in evaluating existing cranes during accident investigations or safety reviews.
van Velden, Julia L; Smith, Tanya; Ryan, Peter G
2016-12-01
The Western Cape population of Blue Cranes (Anthropoides paradiseus) in South Africa is of great importance as the largest population throughout its range. However, Blue Cranes are strongly associated with agricultural lands in the Western Cape, and therefore may come into conflict with farmers who perceive them as damaging to crops. We investigated the viability of this population by exploring farmer attitudes toward crane damage in two regions of the Western Cape, the Swartland and Overberg, using semi-structured interviews. Perceptions of cranes differed widely between regions: farmers in the Swartland perceived crane flocks to be particularly damaging to the feed crop sweet lupin (65 % of farmers reported some level of damage by cranes), and 40 % of these farmers perceived cranes as more problematic than other common bird pests. Farmers in the Overberg did not perceive cranes as highly damaging, although there was concern about cranes eating feed at sheep troughs. Farmers who had experienced large flocks on their farms and farmers who ranked cranes as more problematic than other bird pests more often perceived cranes to be damaging to their livelihoods. Biographical variables and crop profiles could not be related to the perception of damage, indicating the complexity of this human-wildlife conflict. Farmers' need for management alternatives was related to the perceived severity of damage. These results highlight the need for location-specific management solutions to crop damage by cranes, and contribute to the management of this vulnerable species.
Orion Service Module Umbilical (OSMU) Lift & Preparation for Ins
2017-03-13
Construction workers and crane specialists high up on the mobile launcher tower monitor the progress as a crane positions the bracket for the Orion Service Module Umbilical (OSMU) for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
A surgical parallel continuum manipulator with a cable-driven grasper.
Orekhov, Andrew L; Bryson, Caroline E; Till, John; Chung, Scotty; Rucker, D Caleb
2015-01-01
In this paper, we present the design, construction, and control of a six-degree-of-freedom (DOF), 12 mm diameter, parallel continuum manipulator with a 2-DOF, cable-driven grasper. This work is a proof-of-concept first step towards miniaturization of this type of manipulator design to provide increased dexterity and stability in confined-space surgical applications, particularly for endoscopic procedures. Our robotic system consists of six superelastic NiTi (Nitinol) tubes in a standard Stewart-Gough configuration and an end effector with 180 degree motion of its two jaws. Two Kevlar cables pass through the centers of the tube legs to actuate the end effector. A computationally efficient inverse kinematics model provides low-level control inputs to ten independent linear actuators, which drive the Stewart-Gough platform and end-effector actuation cables. We demonstrate the performance and feasibility of this design by conducting open-loop range-of-motion tests for our system.
Crane reproductive physiology and conservation
Gee, G.F.
1983-01-01
Some unique features of crane reproduction, management, and conservation are described. Because cranes are sexually monomorphic, sexing is difficult and must be accomplished using behavior, laparoscopy, cloacal examination, genetic techniques, or fecal steroid analysis. Although husbandry techniques for cranes are similar to those used with other nondomestic birds, a number of basic characteristics, such as extreme aggressiveness, imprinting by the crane chick on man, a delayed molt in the immature crane, delayed sexual maturity, and infertility, pose special problems for the propagator. Artificial insemination is a practical solution to crane infertility. Vigorous captive management and propagation efforts must become increasingly important if several endangered crane species are to survive the continuing decline in wild populations. The ultimate goal is the restoration of suitable habitat and sustainable native populations.
[Production of interspecies hybrid of cranes by artificial insemination with frozen semen].
Maksudov, G Iu; Panchenko, V G
2002-01-01
Studies of artificial insemination of cranes and cryoconservation of their semen have been carried out in the nursery of rare species at the Oka Biosphere Reserve for many years. The criterion of successful cryoconservation of the semen is the obtaining of fertilized eggs after artificial insemination by the thawed semen. An experiment is described on artificial insemination of females of the white-naped crane Grus vipio by the frozen-thawed semen of the Siberian white crane G. leucogeranus after one-year storage of semen in liquid nitrogen. As a result, an interspecific hybrid of cranes was obtained, which confirmed the possibility of producing a bank of cryoconserved crane semen. The use of the white-naped crane females was due to the absence of conspecific males and unavailability of Siberian white crane females. Problems of artificial insemination and cryoconservation of semen of rare crane species are discussed.
Schuh, J.C.; Sileo, L.; Siegfried, Lynne M.; Yuill, Thomas M.
1986-01-01
Inclusion body disease of cranes was the cause of death in 17 immature and mature cranes of 5 different species in Wisconsin. A herpesvirus of unknown origin was the apparent cause. An isolate of this herpesvirus was used to experimentally infect 3 species of cranes. Macroscopic and microscopic lesions associated with naturally acquired and experimentally induced disease were essentially identical. Multifocal hepatic and splenic necrosis was found in all cranes evaluated. Necrosis of the gastrointestinal tract, thymus, and bursa of Fabricius also was seen in some of the cranes. Eosinophilic intranuclear inclusion bodies often were commonly associated with hepatic lesions, sometimes with the splenic lesions, and rarely with the thymic or gastrointestinal tract lesions. The lesions of this inclusion body disease were similar to those reported for cranes in Austria from which a crane herpesvirus was isolated.
Testing a West Nile virus vaccine in sandhill cranes (Grus canadensis)
Olsen, Glenn H.; Miller, K.; Docherty, D.; Sileo, L.; Chavez-Ramirez, Felipe
2005-01-01
Eight sandhill cranes (Grus canadensis) were vaccinated with a commercial equine West Nile virus vaccine (Fort Dodge Animal Health, Fort Dodge, Iowa, USA) at the USGS Patuxent Wildlife Research Center, Laurel, Maryland, USA. Three doses of the vaccine were given, the first dose (day 0) was followed by a second 21 days later and the third dose 7 days after the second day 28 after the first dose). All doses were 0.50 ml. In addition, 5 sandhill cranes were given injections of similar amounts of sterile water on the same schedule. Blood for complete blood counts, serum chemistries, and serological testing was collected at weekly intervals. Ten weeks after the first injection of the vaccine and 6 weeks after the last of the 3 injections of the vaccine, the cranes were shipped to the USGS National Wildlife Heath Center, Madison, Wisconsin, USA. After a two-week adjustment period, 11 of these cranes were injected intramuscularly with one mosquito dose of West Nile virus. Two of the vaccinated cranes were not challenged and acted as uninfected controls. One week post challenge the only abnormal findings were slight weight loss (average 6% loss since the time of challenge with West Nile virus) and elevated white blood cell counts (heterophilic leukocytosis). There were no deaths and no clinically ill cranes (unvaccinated or vaccinated cranes) among the 11 challenged birds. All cranes were euthanized 6 weeks post challenge, and necropsies were performed. Pre-challenge titers showed no titer response to the vaccinations. However, when challenged, vaccinated cranes developed titers more quickly (within 7-10 days), and were viremic and shed virus via the cloaca for a shorter period of time than the unvaccinated cranes (2-7 days for vaccinated cranes versus 2-10 days for unvaccinated cranes). No remarkable lesions were noted in any of the cranes during the necropsy examinations. Histopathological findings are available for only four of the cranes at this time. Three of those had mild to moderate encephalitis, myelitis, and myocarditis. Initial histopathological findings also indicated a difference in the lesions found in the brains of the vaccinated versus unvaccinated cranes. The fourth crane was a vaccinated unchallenged control that had none of the lesions described. We concluded, based on the findings of no adverse reactions and the higher titers and reduced viremia seen in the cranes, that, indeed, the vaccine is safe for use in cranes and can be effective in reducing the severity of a natural infection. We would recommend this vaccine for use in adult cranes. A companion study is looking at the safety and efficacy of the vaccine for crane chicks as young as 7-10 days of age and that will be reported at a later date.
Crystal River 3 Cable Materials for Thermal and Gamma Radiation Aging
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fifield, Leonard S.; Correa, Miguel; Zwoster, Andy
The Expanded Materials Degradation Assessment Volume 5: Aging of Cables and Cable Systems (EMDA) summarizes the state of knowledge of materials, constructions, operating environments, and aging behavior of low voltage and medium cables in nuclear power plants (NPPs) and identifies potential knowledge gaps with regard to cable operation beyond 60 years. The greatest area of uncertainty relates to how well the accelerated aging used in the original equipment qualification (EQ) processes predicts the performance of cable materials in extended operation. General opinion and utility experience have indicated that actual operating environments of in-plant cables are not as severe, however, asmore » the operating and design basis environments used in the qualification process. Better understanding of the long term aging behavior of cable insulation materials in service conditions and the analysis of actual cable operating environments are the objectives of ongoing research to support subsequent license renewal activities in particular and long term cable aging management in general. A key component of the effort to better understand cable material aging behavior is the availability of representative samples of cables that have been installed in operating light water reactors and have experienced long term service. Unique access to long term service cables, including relatively rich information on cable identity and history, occurred in 2016 through the assistance of the Electric Power Research Institute (EPRI). EPRI facilitated DOE receipt of harvested cables from the decommissioned Crystal River Unit 3 (CR3) pressurized water reactor representing six of the nine most common low voltage cable manufacturers (EPRI 103841R1): Rockbestos, Anaconda Wire and Cable Company (Anaconda), Boston Insulated Wire (BIW), Brand-Rex, Kerite and Okonite. Cable samples received had been installed in the operating plant for durations ranging from 10 years to 36 years. These cables provide the opportunity to assess actual in-plant material aging and compare it to the expectations for service aging implied in original equipment qualification. The received samples are from cables manufactured as early as 1971 and as late as 1998. Of the original manufacturers, BIW, Anaconda and Kerite no longer supply low-voltage cables to the nuclear industry. Okonite, Rockbestos, and Brand-Rex do still supply nuclear-grade low-voltage cables, but most cable insulation formulations have changed over the years. Thus the availability of the CR3 samples representative of cables installed in existing U.S. NPPs also presents the opportunity for additional aging studies on the most relevant insulation and jacketing materials. This report describes the cables received from CR3 through EPRI assistance, some of the specific knowledge gaps that study of these cable materials can be used to address, and experimental plans for addressing those gaps using these materials. Harvested cables from CR3 and other NPPs that have experienced long term service, new old stock cables (manufactured before 2000, but never put in service), and relevant modern nuclear cables and materials from cable manufacturers are enabling research to address identified knowledge gaps and better understand long term aging behavior for cable materials currently installed in NPPs. This research, combined with refined understanding of actual service environments and conditions, will both support subsequent licensing activities and more efficient plant cable aging management.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
... transformers and other items to the pole. Commenters complained that the exemption would be largely meaningless... attaching transformers and other equipment to the poles (see 29 CFR 1400(c)(4)). In that exemption, OSHA... that performs the pole work typically installs pad- mount transformers on the ground as part of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
... also involved placing a pole in the hole and attaching transformers and other items to the pole... industries, including placing utility poles in the ground and attaching transformers and other equipment to...- mount transformers on the ground as part of the same power system as the poles. While the pole work is...
29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (up to 350 kV)-assembly and disassembly. 1926.1407 Section 1926.1407 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly...
12. VIEW OF PUMPS NO. 6, 8, AND 7 (L ...
12. VIEW OF PUMPS NO. 6, 8, AND 7 (L TO R) WITH THEIR CANVAS COVERS, LOOKING NORTHEAST. NOTE CONCRETE CONSTRUCTION. THE FOUR LIGHT WINDOWS AND THE STEEL EAM FOR THE 10-TON HAND OPERATED TRAVELING CRANE. - Wyoming Valley Flood Control System, Woodward Pumping Station, East of Toby Creek crossing by Erie-Lackawanna Railroad, Edwardsville, Luzerne County, PA
Environmental Assessment: Anti-Terrorism/Force Protection McConnell Air Force Base, Kansas
2003-09-01
handled, stored, transported, disposed, or recycled in accordance with these regulations. The potential for hazardous waste generation from gate...Loader (rubber tire) Concrete Truck Concrete Finisher Crane Asphalt Spreader Roller Flat Bed Truck (18 wheel) Scraper Trenching Machine 1...plastics, and lumber. These materials would be placed in the appropriate construction materials landfill or recycled when possible. These wastes
Use of ultralight aircraft for introducing migratory crane populations
Clegg, K.R.; Lewis, J.C.; Ellis, D.H.; Urbanek, Richard P.; Stahlecker, Dale
1997-01-01
Objectives were to determine if captive-reared cranes could be led behind an ultralight aircraft (UL) along a migration route and, if after release on a wintering area, they would integrate with wild cranes and migrate north in spring to their natal area without assistance. Greater sandhill cranes (Grus canadensis tabida) were used as the research surrogate for whooping cranes (Grus americana). In 1995, the senior author raised 15 cranes to fledging and trained them to respond to his vocal imitation of a sandhill crane brood call. Chicks learned to follow him as he walked, drove an all-terrain vehicle (ATV), or piloted an UL. The caretakers were not in crane costumes. Cranes were tame but allowed to roam at will without accompanying humans part of the day and were penned at night. Daily excursions provided exposure to habitats, foods, and predators the birds would encounter after release into the wild. In mid-October 1995, 11 radio-tagged cranes were led in migration from Grade, Idaho to Bosque del Apache National Wildlife Refuge (BdANWR), central New Mexico, and released near wild wintering sandhill cranes. The 1,204km migration took 11 days, including 1 day when the aircraft were grounded due to a winter storm. Hazards encountered enroute included mountainous terrain, turbulent air, and attacks by gold eagles (Aquila chrysaetos). On the wintering ground, hazards included crane hunters and coyotes (Canis latrans). Within 2 days after release at the BdANWR wintering site, the research cranes were associating with and imitating the behavior of wild cranes. The 4 surviving birds migrated north in spring 1996 and at the time of this writing 2 were within 53 km of their natal area in Idaho.
Smith, Tanya; Page-Nicholson, Samantha; Morrison, Kerryn; Gibbons, Bradley; Jones, M Genevieve W; van Niekerk, Mark; Botha, Bronwyn; Oliver, Kirsten; McCann, Kevin; Roxburgh, Lizanne
2016-01-01
The International Crane Foundation (ICF) / Endangered Wildlife Trust's (EWT) African Crane Conservation Programme has recorded 26 403 crane sightings in its database from 1978 to 2014. This sightings collection is currently ongoing and records are continuously added to the database by the EWT field staff, ICF/EWT Partnership staff, various partner organizations and private individuals. The dataset has two peak collection periods: 1994-1996 and 2008-2012. The dataset collection spans five African countries: Kenya, Rwanda, South Africa, Uganda and Zambia; 98% of the data were collected in South Africa. Georeferencing of the dataset was verified before publication of the data. The dataset contains data on three African crane species: Blue Crane Anthropoides paradiseus , Grey Crowned Crane Balearica regulorum and Wattled Crane Bugeranus carunculatus . The Blue and Wattled Cranes are classified by the IUCN Red List of Threatened Species as Vulnerable and the Grey Crowned Crane as Endangered. This is the single most comprehensive dataset published on African Crane species that adds new information about the distribution of these three threatened species. We hope this will further aid conservation authorities to monitor and protect these species. The dataset continues to grow and especially to expand in geographic coverage into new countries in Africa and new sites within countries. The dataset can be freely accessed through the Global Biodiversity Information Facility data portal.
Development of 66 kV class REBCO superconducting cable
NASA Astrophysics Data System (ADS)
Ohya, M.; Masuda, T.; Amemiya, N.; Ishiyama, A.; Ohkuma, T.
Sumitomo Electric Industries (SEI) has been involved in the development of 66 kV/5 kA-class HTS cables using REBCO wires. One of the technical targets was to reduce the AC loss to less than 2 W/m/phase at 5 kA. SEI developed a clad-type textured metal substrate with lower magnetization loss than NiW substrates. REBCO wires of 30 mm wide were slit into 4 mm-wide strips, and these strips were wound spirally on a former with small gaps. The measured AC loss of the manufactured cable was 1.8 W/m/phase at 5 kA, achieving the AC loss goal. Another important target was to manage fault current. The copper protection layers were designed based on simulation findings. Fault current tests (max. 31.5 kA, 2 sec) showed that the designed HTS cable has the required withstanding performance. The development of the elemental technologies was finished on schedule, and a 15 m-long HTS cable system will be constructed to demonstrate that it meets all the required specifications.
Liang, Yunlei; Du, Zhijiang; Sun, Lining
2017-01-01
The tendon driven mechanism using a cable and pulley to transmit power is adopted by many surgical robots. However, backlash hysteresis objectively exists in cable-pulley mechanisms, and this nonlinear problem is a great challenge in precise position control during the surgical procedure. Previous studies mainly focused on the transmission characteristics of the cable-driven system and constructed transmission models under particular assumptions to solve nonlinear problems. However, these approaches are limited because the modeling process is complex and the transmission models lack general applicability. This paper presents a novel position compensation control scheme to reduce the impact of backlash hysteresis on the positioning accuracy of surgical robots’ end-effectors. In this paper, a position compensation scheme using a support vector machine based on feedforward control is presented to reduce the position tracking error. To validate the proposed approach, experimental validations are conducted on our cable-pulley system and comparative experiments are carried out. The results show remarkable improvements in the performance of reducing the positioning error for the use of the proposed scheme. PMID:28974011
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Cranes. 126.130 Section 126.130 Shipping COAST GUARD... § 126.130 Cranes. (a) Except as provided by paragraph (b) of this section, cranes, if installed, must... chapter. (b) The manufacturer of a crane may have tests and inspections conducted in compliance with § 107...
76 FR 66617 - Airworthiness Directives; Erickson Air-Crane Incorporated Model S-64F Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-27
... Airworthiness Directives; Erickson Air-Crane Incorporated Model S-64F Helicopters AGENCY: Federal Aviation... the Erickson Air-Crane (Erickson Air-Crane) Model S-64F helicopters. The amendment requires, at..., contact Erickson Air-Crane Incorporated, 3100 Willow Springs Road, P.O. Box 3247, Central Point, OR 97502...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cranes. 126.130 Section 126.130 Shipping COAST GUARD... § 126.130 Cranes. (a) Except as provided by paragraph (b) of this section, cranes, if installed, must... chapter. (b) The manufacturer of a crane may have tests and inspections conducted in compliance with § 107...
NASA Astrophysics Data System (ADS)
Wang, H. F.; Lord, N. E.; Zeng, X.; Fratta, D.; Feigl, K. L.; Team, P.
2016-12-01
The Porotomo research team deployed 8700-meters of Distributed Acoustic Sensing (DAS) cable in a shallow trench on the surface and 400 meters down a borehole at Brady Hot Springs, Nevada in March 2016. The goal of the experiment was to detect changes in geophysical properties associated with hydrologic changes. The DAS cable occupied a natural laboratory of 1500-by-500-by-400-meters overlying a commercial, geothermal field operated by Ormat Technologies. The DAS cable was laid out in three parallel zig-zag lines with line segments approximately 120-meters in length. A large Vibroseis truck (T-Rex) provided the seismic source with a sweep frequency between 5 and 80 Hz over 20 seconds. Over the 15 days of the experiment, the Vibroseis truck re-occupied approximately 250 locations outside and within the array days while changes were made in water reinjection from the power plant into wells in the field. At each source location, one vertical and two orthogonal horizontal modes were excited. Dispersion curves were constructed using MASW and a Vibroseis source location approximately in line with each DAS cable segment or from ambient noise correlation functions. Representative fence diagrams of S-wave profiles were constructed by inverting the dispersion curves obtained for several different line segments.
A 24-hour remote surveillance system for terrestrial wildlife studies
Sykes, P.W.; Ryman, W.E.; Kepler, C.B.; Hardy, J.W.
1995-01-01
The configuration, components, specifications and costs of a state-of-the-art closed-circuit television system with wide application for wildlife research and management are described. The principal system components consist of color CCTV camera with zoom lens, pan/tilt system, infrared illuminator, heavy duty tripod, coaxial cable, coaxitron system, half-duplex equalizing video/control amplifier, timelapse video cassette recorder, color video monitor, VHS video cassettes, portable generator, fuel tank and power cable. This system was developed and used in a study of Mississippi sandhiIl Crane (Grus canadensis pratensis) behaviors during incubation, hatching and fledging. The main advantages of the system are minimal downtime where a complete record of every event, its time of occurrence and duration, are permanently recorded and can be replayed as many times as necessary thereafter to retrieve the data. The system is particularly applicable for studies of behavior and predation, for counting individuals, or recording difficult to observe activities. The system can be run continuously for several weeks by two people, reducing personnel costs. This paper is intended to provide biologists who have litte knowledge of electronics with a system that might be useful to their specific needs. The disadvantages of this system are the initial costs (about $9800 basic, 1990-1991 U.S. dollars) and the time required to playback video cassette tapes for data retrieval, but the playback can be sped up when litte or no activity of interest is taking place. In our study, the positive aspects of the system far outweighed the negative.
The Construction of Infrastructure for Library's Digital Document Telecommunications.
ERIC Educational Resources Information Center
Changxing, Ying; Zuzao, Lin
This paper discusses the construction of the infrastructure for libraries' digital document telecommunications. The first section describes the topologies of the library LAN (Local Area Network) cabling system, including the main characteristics of the LAN and three classical topologies typically used with LANs, i.e., the bus, star, and ring…
Clinical pathology results from cranes with experimental West Nile Virus infection
Olsen, Glenn H.
2011-01-01
Sandhill cranes (Grus canadensis) were vaccinated for and then challenged with West Nile virus. Resulting titers demonstrated protection in the vaccinated-challenged cranes as compared to the unvaccinated-challenged cranes. Clinical pathology results showed challenged cranes, whether vaccinated or not, had a decrease in their hematocrits and an elevation of 2.5-fold in their white blood cell counts as compared to unchallenged control sandhill cranes. No differences were apparent in the differential counts of heterophils and lymphocytes.
Improvements to the Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN)
NASA Technical Reports Server (NTRS)
Doggett, William R.; Dorsey, John T.; Jones, Thomas C.; Lodding, Kenneth N.; Ganoe, George G.; Mercer, David; King, Bruce D.
2015-01-01
Devices for manipulating and precisely placing payloads are critical for efficient space operations including berthing of spacecraft, in-space assembly, construction and repair. Key to the success of many NASA space activities has been the availability of long-reach crane-like devices such as the Shuttle Remote Manipulation System (SRMS) and the Space Station Remote Manipulation System (SSRMS). These devices have been used for many operations including berthing visiting spacecraft to the International Space Station, deployment of spacecraft, space station assembly, astronaut positioning, payload transfer, and spacecraft inspection prior to atmospheric re-entry. Retiring the Space Transportation System has led to the removal of the SRMS from consideration for in-space missions, thus creating a capability gap. Recognizing this gap, work was initiated at NASA on a new architecture for long-reach space manipulators. Most current devices are constructed by joining revolute joints with carbon composite tubes, with the joints accounting for the majority of the device mass. For example in the case of the SRMS, the entire device mass is 410 kg (904 lbm); the joint structure, motors, gear train, cabling, etc., accounts for the majority of the system mass because the carbon composite tubes mass is 46 kg (101 lbm). An alternate space manipulator concept, the Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN) was created to address deficiencies in the current state-of-the-art in long-reach manipulators. The antagonistic tendon actuated joint architecture allows the motors actuating the joint to be removed from the joint axis, which simplifies the joint design while simultaneously providing mechanical advantage for the motors. The improved mechanical advantage, in turn, reduces the size and power requirements for the motor and gear train. This paper will describe recent architectural improvements to the TALISMAN design that: 1) improve the operational robustness of the system by enabling maneuvers not originally possible by varying the TALISMAN geometry; 2) enable efficient active antagonistic control of a joint while sharing cable between antagonistic tension networks; and 3) uses a unique arrangement of differential capstans to reduce motor torque requirements by an order of magnitude. The paper will also summarize recent efforts to enable autonomous deployment of a TALISMAN including the deployment concept of operations and associated hardware system design. The deployment forces are provided by the same motor systems that are used for articulation, thus reducing the mass associated with the deployment system. The deployment approach is being tested on a TALISMAN prototype which is designed to provide the same operational performance as a shuttle-class manipulator. The prototype has been fabricated and is operational in a new facility at NASA Langley Research Center that has a large area (15.2 m by 21.3 m [50 ft by 70 ft]) air-bearing floor.
Pearse, A.T.; Krapu, G.L.; Brandt, D.A.; Kinzel, P.J.
2010-01-01
The central Platte River valley (CPRV) in Nebraska, USA, is a key spring-staging area for approximately 80 of the midcontinent population of sandhill cranes (Grus canadensis; hereafter cranes). Evidence that staging cranes acquired less lipid reserves during the 1990s compared to the late 1970s and increases in use of the CPRV by snow geese (Chen caerulescens) prompted us to investigate availability of waste corn and quantify spatial and temporal patterns of crane and waterfowl use of the region. We developed a predictive model to assess impacts of changes in availability of corn and snow goose abundance under past, present, and potential future conditions. Over a hypothetical 60-day staging period, predicted energy demand of cranes and waterfowl increased 87 between the late 1970s and 19982007, primarily because peak abundances of snow geese increased by 650,000 and cranes by 110,000. Compared to spring 1979, corn available when cranes arrived was 20 less in 1998 and 68 less in 1999; consequently, the area of cornfields required to meet crane needs increased from 14,464 ha in 1979 to 32,751 ha in 1998 and 90,559 ha in 1999. Using a pooled estimate of 88 kg/ha from springs 19981999 and 20052007, the area of cornfields needed to supply food requirements of cranes and waterfowl increased to 65,587 ha and was greatest in the eastern region of the CPRV, where an estimated 54 of cranes, 47 of Canada geese (Branta canadensis), 45 of greater white-fronted geese (Anser albifrons), and 46 of snow geese occurred during ground surveys. We estimated that a future reduction of 25 in available corn or cornfields would increase daily foraging flight distances of cranes by 2738. Crane use and ability of cranes to store lipid reserves in the CPRV could be reduced substantially if flight distance required to locate adequate corn exceeded a physiological maximum distance cranes could fly in search of food. Options to increase carrying capacity for cranes include increasing accessibility of cornfields by restoring degraded river channels to disperse roosting cranes and increasing wetland availability in the Rainwater Basin to attract snow geese using the CPRV. ?? The Wildlife Society.
Mummert, D.P.; Chambers, C.L.; Ellis, D.H.
2001-01-01
To determine how the behavior of greater sandhill cranes (Grus canadensis tabida) changes according to time of year, time of day, and number of days after release, we observed the activities of 2 groups of captive-reared greater sandhill cranes at Mormon Lake, northern Arizona. The behaviors we compared were alert, loafing, sleeping, foraging, preening, locomotion, and other. We found costume-reared subadult greater sandhill cranes that were established at the study site for a year spent more time foraging and being alert towards predators than parent-reared juvenile greater sandhill cranes that were recently released from captivity. We also found that with time juvenile sandhill cranes were increasingly alert and spent less time loafing. It appeared that captive-reared juvenile sandhill cranes learn behavior important for survival from previously released captive-reared cranes.
2007-12-14
KENNEDY SPACE CENTER, FLA. -- A pair of sandhill cranes search for food on the grounds near the Headquarters Building at NASA's Kennedy Space Center. Sandhill cranes are primarily birds of open freshwater wetlands and shallow marshes and in Florida use seasonally variable wetlands, grasslands, and palm and pine savannahs. Sandhill cranes are omnivorous, feeding on a wide variety of plant materials (including waste grains) and small vertebrates and invertebrates, both on land and in shallow wetlands. Florida's sandhill crane population increases as cranes from northern states spend the winter in Florida. Florida sandhill cranes stay with the same mate for several years and young sandhills stay with their parents until they are about 10 months old. Like their endangered relatives the whooping cranes, sandhills live to be older than most birds. In fact, some sandhill cranes live up to 20 years. Photo credit: NASAJim Grossmann
2007-12-14
KENNEDY SPACE CENTER, FLA. -- Sandhill cranes stalk a parking lot near the Headquarters Building at NASA's Kennedy Space Center. Sandhill cranes are primarily birds of open freshwater wetlands and shallow marshes and in Florida use seasonally variable wetlands, grasslands, and palm and pine savannahs. Sandhill cranes are omnivorous, feeding on a wide variety of plant materials (including waste grains) and small vertebrates and invertebrates, both on land and in shallow wetlands. Florida's sandhill crane population increases as cranes from northern states spend the winter in Florida. Florida sandhill cranes stay with the same mate for several years and young sandhills stay with their parents until they are about 10 months old. Like their endangered relatives the whooping cranes, sandhills live to be older than most birds. In fact, some sandhill cranes live up to 20 years. Photo credit: NASAJim Grossmann
2007-12-14
KENNEDY SPACE CENTER, FLA. -- A sandhill crane is on the lookout on grounds near the Headquarters Building at NASA's Kennedy Space Center. Sandhill cranes are primarily birds of open freshwater wetlands and shallow marshes and in Florida use seasonally variable wetlands, grasslands, and palm and pine savannahs. Sandhill cranes are omnivorous, feeding on a wide variety of plant materials (including waste grains) and small vertebrates and invertebrates, both on land and in shallow wetlands. Florida's sandhill crane population increases as cranes from northern states spend the winter in Florida. Florida sandhill cranes stay with the same mate for several years and young sandhills stay with their parents until they are about 10 months old. Like their endangered relatives the whooping cranes, sandhills live to be older than most birds. In fact, some sandhill cranes live up to 20 years. Photo credit: NASAJim Grossmann
2007-12-14
KENNEDY SPACE CENTER, FLA. -- A sandhill crane is on the lookout in a parking lot near the Headquarters Building at NASA's Kennedy Space Center. Sandhill cranes are primarily birds of open freshwater wetlands and shallow marshes and in Florida use seasonally variable wetlands, grasslands, and palm and pine savannahs. Sandhill cranes are omnivorous, feeding on a wide variety of plant materials (including waste grains) and small vertebrates and invertebrates, both on land and in shallow wetlands. Florida's sandhill crane population increases as cranes from northern states spend the winter in Florida. Florida sandhill cranes stay with the same mate for several years and young sandhills stay with their parents until they are about 10 months old. Like their endangered relatives the whooping cranes, sandhills live to be older than most birds. In fact, some sandhill cranes live up to 20 years. Photo credit: NASAJim Grossmann
Smith, Tanya; Page-Nicholson, Samantha; Gibbons, Bradley; Jones, M. Genevieve W.; van Niekerk, Mark; Botha, Bronwyn; Oliver, Kirsten; McCann, Kevin
2016-01-01
Abstract Background The International Crane Foundation (ICF) / Endangered Wildlife Trust’s (EWT) African Crane Conservation Programme has recorded 26 403 crane sightings in its database from 1978 to 2014. This sightings collection is currently ongoing and records are continuously added to the database by the EWT field staff, ICF/EWT Partnership staff, various partner organizations and private individuals. The dataset has two peak collection periods: 1994-1996 and 2008-2012. The dataset collection spans five African countries: Kenya, Rwanda, South Africa, Uganda and Zambia; 98% of the data were collected in South Africa. Georeferencing of the dataset was verified before publication of the data. The dataset contains data on three African crane species: Blue Crane Anthropoides paradiseus, Grey Crowned Crane Balearica regulorum and Wattled Crane Bugeranus carunculatus. The Blue and Wattled Cranes are classified by the IUCN Red List of Threatened Species as Vulnerable and the Grey Crowned Crane as Endangered. New information This is the single most comprehensive dataset published on African Crane species that adds new information about the distribution of these three threatened species. We hope this will further aid conservation authorities to monitor and protect these species. The dataset continues to grow and especially to expand in geographic coverage into new countries in Africa and new sites within countries. The dataset can be freely accessed through the Global Biodiversity Information Facility data portal. PMID:27956850
Kitanovic, Smiljka; Ames, Peter; Parkinson, John S.
2011-01-01
During transmembrane signaling by Escherichia coli Tsr, changes in ligand occupancy in the periplasmic serine-binding domain promote asymmetric motions in a four-helix transmembrane bundle. Piston displacements of the signaling TM2 helix in turn modulate the HAMP bundle on the cytoplasmic side of the membrane to control receptor output signals to the flagellar motors. A five-residue control cable joins TM2 to the HAMP AS1 helix and mediates conformational interactions between them. To explore control cable structural features important for signal transmission, we constructed and characterized all possible single amino acid replacements at the Tsr control cable residues. Only a few lesions abolished Tsr function, indicating that the chemical nature and size of the control cable side chains are not individually critical for signal control. Charged replacements at I214 mimicked the signaling consequences of attractant or repellent stimuli, most likely through aberrant structural interactions of the mutant side chains with the membrane interfacial environment. Prolines at residues 214 to 217 also caused signaling defects, suggesting that the control cable has helical character. However, proline did not disrupt function at G213, the first control cable residue, which might serve as a structural transition between the TM2 and AS1 helix registers. Hydrophobic amino acids at S217, the last control cable residue, produced attractant-mimic effects, most likely by contributing to packing interactions within the HAMP bundle. These results suggest a helix extension mechanism of Tsr transmembrane signaling in which TM2 piston motions influence HAMP stability by modulating the helicity of the control cable segment. PMID:21803986
29 CFR 1919.71 - Unit proof test and examination of cranes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 7 2011-07-01 2011-07-01 false Unit proof test and examination of cranes. 1919.71 Section... § 1919.71 Unit proof test and examination of cranes. (a) Unit proof tests of cranes shall be carried out at the following times: (1) In the cases of new cranes, before initial use and every 4 years...
30 CFR 250.108 - What requirements must I follow for cranes and other material-handling equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What requirements must I follow for cranes and... follow for cranes and other material-handling equipment? (a) All cranes installed on fixed platforms must... Maintenance of Offshore Cranes (API RP 2D), incorporated by reference as specified in 30 CFR 250.198. (b) All...
29 CFR 1919.71 - Unit proof test and examination of cranes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 7 2010-07-01 2010-07-01 false Unit proof test and examination of cranes. 1919.71 Section... § 1919.71 Unit proof test and examination of cranes. (a) Unit proof tests of cranes shall be carried out at the following times: (1) In the cases of new cranes, before initial use and every 4 years...
29 CFR 1918.55 - Cranes (See also § 1918.11).
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Operator's station. (1) Cranes with missing, broken, cracked, scratched, or dirty glass (or equivalent...) Unattended cranes. When cranes are left unattended between work periods, § 1918.66(b) (4)(i) through (v...
29 CFR 1918.55 - Cranes (See also § 1918.11).
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Operator's station. (1) Cranes with missing, broken, cracked, scratched, or dirty glass (or equivalent...) Unattended cranes. When cranes are left unattended between work periods, § 1918.66(b) (4)(i) through (v...
29 CFR 1918.55 - Cranes (See also § 1918.11).
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Operator's station. (1) Cranes with missing, broken, cracked, scratched, or dirty glass (or equivalent...) Unattended cranes. When cranes are left unattended between work periods, § 1918.66(b) (4)(i) through (v...
Note: A novel method for generating multichannel quasi-square-wave pulses.
Mao, C; Zou, X; Wang, X
2015-08-01
A 21-channel quasi-square-wave nanosecond pulse generator was constructed. The generator consists of a high-voltage square-wave pulser and a channel divider. Using an electromagnetic relay as a switch and a 50-Ω polyethylene cable as a pulse forming line, the high-voltage pulser produces a 10-ns square-wave pulse of 1070 V. With a specially designed resistor-cable network, the channel divider divides the high-voltage square-wave pulse into 21 identical 10-ns quasi-square-wave pulses of 51 V, exactly equal to 1070 V/21. The generator can operate not only in a simultaneous mode but also in a delay mode if the cables in the channel divider are different in length.
Efficacy of eastern encephalitis immunization in whooping cranes
Olsen, Glenn H.; Turell, M.J.; Pagac, B.B.
1997-01-01
An epizootic of eastern equine encephalitis (EEE) at the Patuxent Wildlife Research Center (PWRC), Laurel, Maryland (USA), in 1989 provided an opportunity to determine if EEE immunization protected whooping cranes (Grus americana). Based on seroconversion of 31 % of sympatric hatch-year sandhill cranes, Grus canadensis, and a previous 35% case fatality rate in whooping cranes, 17 (37%) of the 46 susceptible whooping cranes should have been exposed to virus and six should have died. As there were no deaths in these birds, the EEE vaccination program appeared to be efficacious in this whooping crane population.
The SPACEHAB double module is moved into the payload changeout room at Launch Pad 39B
NASA Technical Reports Server (NTRS)
1999-01-01
This fish-eye view shows the SPACEHAB Double module being moved into the payload changeout room at Launch Pad 39B before being transferred to Space Shuttle Discovery's payload bay for mission STS-96. The second flight supporting construction of the International Space Station, STS-96 is a logistics and resupply mission, carrying more than 5,000 pounds of supplies, a Russian- built crane and a U.S.-built crane, plus experiments such as STARSHINE, which was developed by and for students. Comprising the crew are Commander Kent V. Rominger, Pilot Rick Douglas Husband, and Mission Specialists Ellen Ochoa (Ph.D.), Tamara E. Jernigan (Ph.D.), Daniel Barry (M.D., Ph.D.), Julie Payette, with the Canadian Space Agency, and Valery Ivanovich Tokarev, with the Russian Space Agency. Liftoff is scheduled for May 20 at 9:32 a.m. EDT.
Scott and Doi conduct tool evaluations during second EVA of STS-87
1997-12-03
STS087-341-004 (3 Dec. 1997) --- Backdropped over Africa, Takao Doi, international mission specialist representing Japan’s National Space Development Agency (NASDA), works with a crane device during a second extravehicular activity (EVA) designed to help evaluate techniques and hardware to be used in constructing the International Space Station (ISS). Takao Doi and astronaut Winston E. Scott (out of frame) were involved in the mission's second EVA in the cargo bay of the Earth-orbiting Space Shuttle Columbia. Takao Doi is working with a 156-pound crane designed to aid spacewalkers in transporting Orbital Replacement Units (ORU) from translation carts on the exterior of the ISS to various worksites on the truss structure. The view of Earth below features an inland delta in Mali (frame center). This view is from the east toward the west and was taken with a 35mm camera.
2017-06-14
Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core booster aboard the barge Pegasus. Construction workers with Southeast Cherokee Construction Inc. work to shore up the turn basin area. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the 300,000-pound core booster aboard the modified Pegasus barge. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.
Hematological and serum chemistry norms for sandhill and whooping cranes
Olsen, Glenn H.; Hendricks, M.M.; Dressler, L.E.
2001-01-01
The normal values used as a diagnostic tool and for comparison of cranes were established in the early 1970's. In that early study, no effort was made to look at factors such as age, sex, or subspecies. In addition, during the early study disease problems (primarily disseminated visceral coccidiosis) and nutritional problems were undiagnosed and uncontrolled. For 2 years during the annual health examinations of cranes at the USGS Patuxent Wildlife Research Center (Patuxent), we collected blood from healthy cranes for analysis. We found significant differences between the values reported from the 1970's and the values seen in this study for 8 blood parameters for Florida sandhill cranes (Grus canadensis pratensis), 6 blood parameters for greater sandhill cranes (G. c. tabida), and 6 blood parameters for whooping cranes (Grus americana). In addition, there were significant differences for some hematology and serum chemistry values based on the age of the cranes.
Mudrik, E A; Kashentseva, T A; Gamburg, E A; Politov, D V
2014-01-01
The genetic diversity of the founders of an artificial population of the Siberian crane Grus leucogeranus Pallas (rare species of cranes) was characterized using 10 microsatellite loci. It was established that the allelic diversity (on average, 5.9 alleles per locus) and genic (H(o) = 0.739) diversity of the Siberian crane is rather high and comparable with the estimations for natural populations of different crane species. Genetic passportization of the birds (119 individuals) from the register of the Siberian crane International Studbook was carried out at the initial stage. The efficiency of genetic passportization for individual identification, identification of the origin, paternity analysis, and exclusion of inbreeding was demonstrated in Siberian cranes under natural mating and artificial insemination. Cases of natural reproduction in pairs of Siberian cranes imprinted to the human and continuous storage of spermatozoa in the female reproductive ducts were registered.
NASA Astrophysics Data System (ADS)
Enin, S. S.; Omelchenko, E. Y.; Fomin, N. V.; Beliy, A. V.
2018-03-01
The paper has a description of a computer model of an overhead crane system. The designed overhead crane system consists of hoisting, trolley and crane mechanisms as well as a payload two-axis system. With the help of the differential equation of specified mechanisms movement derived through Lagrange equation of the II kind, it is possible to build an overhead crane computer model. The computer model was obtained using Matlab software. Transients of coordinate, linear speed and motor torque of trolley and crane mechanism systems were simulated. In addition, transients of payload swaying were obtained with respect to the vertical axis. A trajectory of the trolley mechanism with simultaneous operation with the crane mechanism is represented in the paper as well as a two-axis trajectory of payload. The designed computer model of an overhead crane is a great means for studying positioning control and anti-sway control systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.693 Joints. Control... in cable control systems. For ball or roller bearings, the approved ratings may not be exceeded...
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.693 Joints. Control... in cable control systems. For ball or roller bearings, the approved ratings may not be exceeded...
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.693 Joints. Control... in cable control systems. For ball or roller bearings, the approved ratings may not be exceeded...
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.693 Joints. Control... in cable control systems. For ball or roller bearings, the approved ratings may not be exceeded...
Wireless telemetry system for floating bodies
NASA Technical Reports Server (NTRS)
Fain, L. T.; Cribb, H. E.
1974-01-01
Unit includes rugged waterproof cables and equipment containers, low power, sturdy antenna construction, and easy equipment setup and serviceability. Accuracy and reliability of entire measurement system were not sacrificed.
Cryopreservation of crane semen
Gee, G.F.; Harris, James
1991-01-01
The method for the cryopreservation of crane semen at Patuxent Wildlife Research Center is described in detail. Cryopreservation is useful for the long-term storage of crane semen and for specialized propagation needs. A 50% fertility rate from most sandhill cranes, Grus canadensis, inseminated with frozen-thawed semen can be expected. Additional research should improve the fertility rate and determine how applicable the technique is to other crane species.
Demonstration of Heavy Diesel Hybrid Fleet Vehicles
2016-03-29
Refuse 54 Hybrid Launch Assist Truck, Dump 921 Truck, Refrigerator 147 Truck, High Reach, Various 327 Crane, Wheeled, Truck Mounted 250 Truck...Types Medium Tactical Vehicle Rep. (MTVR) 9,069 Line Haul Tractor 5,013 In-Progress; Hybrid Electric System Dump Truck 776 Naval Construction...data. Card readers capture this data at the point of fueling using a specified card reader. Information improved data consistency as compared with
29 CFR 1926.1407 - Power line safety (up to 350 kV)-assembly and disassembly.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (up to 350 kV)-assembly and disassembly... Cranes and Derricks in Construction § 1926.1407 Power line safety (up to 350 kV)—assembly and disassembly... area of assembly/disassembly, closer than 20 feet to a power line during the assembly/disassembly...
78 FR 32110 - Cranes and Derricks in Construction: Revising the Exemption for Digger Derricks
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
... poles in the ground and attaching transformers and other equipment to the poles (see 29 CFR 1400(c)(4... attaching transformers and other items to the pole (see 75 FR 47906, 47924-47926, and 48136 (Aug. 9, 2010... transformers on the ground as part of the same power system as the poles. While the pole work is exempt under...
Abl N-terminal Cap stabilization of SH3 domain dynamics†
Chen, Shugui; Dumitrescu, Teodora Pene; Smithgall, Thomas E.; Engen, John R.
2008-01-01
Crystal structures and other biochemical data indicate that the N-terminal cap (NCap) region of the Abelson tyrosine kinase (c-Abl) is important for maintaining the downregulated conformation of the kinase domain. The exact contributions that NCap makes in stabilizing the various intramolecular interactions within c-Abl are less clear. While the NCap appears important for locking the SH3/SH2 domains to the back of the kinase domain, there may be other more subtle elements of regulation. Hydrogen exchange (HX) and mass spectrometry (MS) were used to determine if the NCap contributes to intramolecular interactions involving the Abl SH3 domain. Under physiological conditions, the Abl SH3 domain underwent partial unfolding and its unfolding half-life was slowed during binding to the SH2-kinase linker, providing a unique assay to test NCap-induced stabilization of the SH3 domain in various constructs. The results showed that NCap stabilizes the dynamics of the SH3 domain in certain constructs but does not increase the relative affinity of the SH3 domain for the native SH2-kinase linker. The stabilization effect was absent in constructs of just NCap + SH3 but was obvious when the SH2 domain and the SH2-kinase linker were present. These results suggest that interactions between NCap and the SH3 domain can contribute to c-Abl stabilization in constructs that contain at least the SH2 domain, an effect that may partially compensate for the absence of the negative regulatory C-terminal tail found in the related Src family of kinases. PMID:18452309
Abl N-terminal cap stabilization of SH3 domain dynamics.
Chen, Shugui; Dumitrescu, Teodora Pene; Smithgall, Thomas E; Engen, John R
2008-05-27
Crystal structures and other biochemical data indicate that the N-terminal cap (NCap) region of the Abelson tyrosine kinase (c-Abl) is important for maintaining the downregulated conformation of the kinase domain. The exact contributions that the NCap makes in stabilizing the various intramolecular interactions within c-Abl are less clear. While the NCap appears to be important for locking the SH3 and SH2 domains to the back of the kinase domain, there may be other more subtle elements of regulation. Hydrogen exchange (HX) and mass spectrometry (MS) were used to determine if the NCap contributes to intramolecular interactions involving the Abl SH3 domain. Under physiological conditions, the Abl SH3 domain underwent partial unfolding and its unfolding half-life was slowed during binding to the SH2 kinase linker, providing a unique assay for testing NCap-induced stabilization of the SH3 domain in various constructs. The results showed that the NCap stabilizes the dynamics of the SH3 domain in certain constructs but does not increase the relative affinity of the SH3 domain for the native SH2 kinase linker. The stabilization effect was absent in constructs of just the NCap and SH3 but was obvious when the SH2 domain and the SH2 kinase linker were present. These results suggest that interactions between the NCap and the SH3 domain can contribute to c-Abl stabilization in constructs that contain at least the SH2 domain, an effect that may partially compensate for the absence of the negative regulatory C-terminal tail found in the related Src family of kinases.
Avian tuberculosis and salmonellosis in a whooping crane (Grus americana)
Stroud, R.K.; Thoen, C.O.; Duncan, R.M.
1986-01-01
The whooping crane has been the subject of intensive scientific study and management because it is an endangered species and has high public interest. Programs have been developed to identify critical habitat, to increase production through captive breeding, and in recent years, to use sandhill cranes (Grus canadensis) as surrogate parents in establishing new populations of wild whooping cranes. Only a few reports describing diseases and parasites in wild whooping cranes appear in the literature because opportunities to secure specimens are limited for this rare, protected bird (for review, see Carpenter and Derrickson, In Proc. International Crane Workshop of 1983, Bharatur, India, in press). Avian tuberculosis and concurrent salmonellosis in a wild whooping crane are described in this case report.
Urban construction and safety project
NASA Technical Reports Server (NTRS)
1975-01-01
The purpose and functions of NASA technology applications temas (TAT) are described, with emphasis on the activities of the Urban and Construction and Safety Project. The transfer and implementation of technology is discussed in five activities. Topics include: flat conductor cable, NASA house and compendium, flood insurance studies, tornado studies, and the controller for stationary diesels.
7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE ...
7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE BUNKER. SHOWS OPENING TO CABLE CHASE, FOUR PULLEY DEVICES, POWER OUTLET, CONDUIT, AND EAST END WALL OF BUNKER. INEL PHOTO NUMBER 65-5441, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
15. ELECTRICAL REACTOR SHELVES, CONSTRUCTED OF CONCRETE IN THE BASEMENT ...
15. ELECTRICAL REACTOR SHELVES, CONSTRUCTED OF CONCRETE IN THE BASEMENT ALONG EAST WALL, WITH REACTOR PADS BEHIND FRAMED AND SCREENED CAGE, AND PORCELAIN-LINED CABLE DUCTS VISIBLE IN WALL NEAR FLOOR AT REAR - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fifield, Leonard S.
Harvested cables from operating or decommissioned nuclear power plants present an important opportunity to validate models, understanding material aging behavior, and validate characterization techniques. Crystal River Unit 3 Nuclear Generating Plant is a pressurized water reactor that was licensed to operate from 1976 to 2013. Cable segments were harvested and made available to the Light Water Reactor Sustainability research program through the Electric Power Research Institute. Information on the locations and circuits within the reactor from whence the cable segments came, cable construction, sourcing and installation information, and photographs of the cable locations prior to harvesting were provided. The cablemore » variations provided represent six of the ten most common cable insulations in the nuclear industry and experienced service usage for periods from 15 to 42 years. Subsequently, these cables constitute a valuable asset for research to understand aging behavior and measurement of nuclear cables. Received cables harvested from Crystal River Unit 3 Nuclear Generating Plant consist of low voltage, insulated conductor surrounded by jackets in lengths from 24 to 100 feet each. Cable materials will primarily be used to investigate aging under simultaneous thermal and gamma radiation exposure. Each cable insulation and jacket material will be characterized in its as-received condition, including determination of the temperatures associated with endothermic transitions in the material using differential scanning calorimetry and dynamic mechanical analysis. Temperatures for additional thermal exposure aging will be selected following the thermal analysis to avoid transitions in accelerated laboratory aging that do not occur in field conditions. Aging temperatures above thermal transitions may also be targeted to investigate the potential for artifacts in lifetime prediction from rapid accelerated aging. Total gamma doses and dose rates targeted for each material will be determined based on filling gaps in prior work, known limits of material classes and resource constraints. Experimental plans will be developed in the context of existing data for the insulation and jacket materials available in published Department of Energy and Electric Power Research Institute reports toward addressing identified knowledge gaps.« less
Teraoka, Hiroki; Kumagai, Yoshihiro; Iwai, Hisae; Haraguchi, Kensaku; Ohba, Takashi; Nakai, Kunihiko; Satoh, Hiroshi; Sakamoto, Mineshi; Momose, Kunikazu; Masatomi, Hiroyuki; Hiraga, Takeo
2007-02-01
Japanese cranes (Grus japonensis) of eastern Hokkaido, Japan, and migrants between the Amur River basin and the eastern China-Korea Peninsula, live around fresh and brackish wetlands. Only a few thousand cranes are confirmed to exist in the world, so they are under threat of extinction. To understand the adverse effects of metal accumulation, we measured concentrations of three heavy metals in the liver, kidney, and muscle of 93 Japanese cranes from Hokkaido. The cranes were classified into six categories according to their sex and three life stages. Cadmium and mercury (Hg: total mercury) showed age-dependent but not sex-dependent accumulation in the liver and kidney. Twenty cranes showed 30 microg/g or higher levels of Hg in dry tissue and five adult cranes had more than 100 microg/g in their livers or kidneys. Cadmium concentrations were generally lower in all samples. Two adult cranes showed extremely high lead levels of more than 30 microg/g in their livers, suggesting lead poisoning. These results have highlighted the widespread and high levels of Hg pollution in Japanese cranes in Hokkaido, Japan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pietryk, Steven
The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGsmore » (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.« less
Efficacy of eastern equine encephalitis immunization in whooping cranes.
Olsen, G H; Turell, M J; Pagac, B B
1997-04-01
An epizootic of eastern equine encephalitis (EEE) at the Patuxent Wildlife Research Center (PWRC), Laurel, Maryland (USA), in 1989 provided an opportunity to determine if EEE immunization protected whooping cranes (Grus americana). Based on seroconversion of 31% of sympatric hatch-year sandhill cranes, Grus canadensis, and a previous 35% case fatality rate in whooping cranes, 17 (37%) of the 46 susceptible whooping cranes should have been exposed to virus and six should have died. As there were no deaths in these birds, the EEE vaccination program appeared to be efficacious in this whooping crane population.
Mortality of Mississippi Sandhill Crane chicks
Olsen, Glenn H.
2004-01-01
Mississippi sandhill cranes (Grus canadensis pulla) are a highly endangered species that live in the wild in 1 county in Mississippi. As part of a large effort to restore these endangered cranes, we are conducting a project to look at the causes of mortality in crane chicks on the Mississippi Sandhill Crane National Wildlife Refuge in Gautier, MS, USA. This includes surgically implanting miniature radio transmitters in crane chicks to gather data on mortality. This article describes some of the practical difficulties in conducting this type of project in a savannah and swamp location along the Gulf Coast of the USA.
Olsen, Glenn H.; Carpenter, J.W.; Gee, G.F.; Thomas, N.J.; Dein, F.J.
1995-01-01
In 1987, an epizootic in cranes at the Patuxent Wildlife Research Center, Laurel, Maryland, USA, caused illness in 80% of 300 captive whooping cranes (Grus americana) and sandhill cranes (Grus canadensis) and death of 15 of these cranes. Gross pathology findings were inconclusive and consisted of dehydration, atrophy of fat, renal insufficiency, and small spleens. Extensive testing resulted in isolation of Fusarium sp. mold from constituents of the grain-based diet. Low levels of two mycotoxins, T2 (1-2 ppm) and deoxynivalenol (0.4 ppm), were isolated from the pelleted feed.
Pulmonary lesions in disseminated visceral coccidiosis of sandhill and whooping cranes
Novilla, M.N.; Carpenter, J.W.; Jeffers, T.K.; White, S.L.
1989-01-01
Fifty cranes, consisting of 46 sandhill (Grus canadensis) and four whooping cranes (Grus americana), were studied. Eighteen sandhill cranes and the four whooping cranes were naturally infected with disseminated visceral coccidiosis (DVC). The remaining sandhill cranes were chicks experimentally infected with oocysts of Eimeria reichenowi and/or E. gruis; five chicks served as controls. There were no clinical signs attributed to respiratory infection. Necropsy of naturally infected adult birds revealed nodules in many organs, including the lung, air sacs, trachea and nares. Artificially infected sandhill cranes and the whooping crane chicks that died from DVC had congestion and consolidated areas in the lung with frothy fluid in the airways. Grossly visible nodules were observed from 10 days postinoculation. Granulomatous pneumonia and tracheitis were observed with light microscopy. Lesions were associated with merogonic and gametogonic stages of eimerian coccidia. Granulomas and granulomatous foci contained parasitized large mononuclear cells. Merogonic stages were seen in lymphoid cells by ultrastructural examination. Oocysts were observed in the trachea and bronchial mucosa and admixed with exudate in the airways, indicating that crane eimerians can complete their life cycle at these sites. Of the few eimeriid coccidia that have extraintestinal stages of development in birds and mammals, only the species in cranes complete their life cycle in both the digestive and respiratory tracts.
Control strategies for crane systems: A comprehensive review
NASA Astrophysics Data System (ADS)
Ramli, Liyana; Mohamed, Z.; Abdullahi, Auwalu M.; Jaafar, H. I.; Lazim, Izzuddin M.
2017-10-01
Crane systems are tremendously utilised in numerous heavy load transportation industries, and therefore, the control of crane systems is a well-established research field. As the last review paper was published more than a decade ago, there is a lack of collected and organised information regarding the latest and the newest updates on control strategies for crane control systems. Hence, this paper presents a comprehensive review of crane control strategies discussing the latest research works during the years from 2000 to 2016. Various crane types and control issues are highlighted, followed by the main focus of this paper, an extensive review of the control schemes for diverse types of crane systems that have been carried out in the 21st century. A brief review on modelling of single-pendulum and double-pendulum crane systems is also given. In addition, anti-sway control systems for industrial cranes that are available on the market is described. This paper summarises most of the related work and also pays a special focus on research trends regarding the control of crane systems that have been previously published in the literature. It is envisaged that this review paper will be helpful to new researchers when identifying research directions for this particular area of interest.
Changes of mercury contamination in red-crowned cranes, Grus japonensis, in East Hokkaido, Japan.
Teraoka, Hiroki; Tagami, Yukari; Kudo, Moe; Miura, Yoshiaki; Okamoto, Erika; Matsumoto, Fumio; Koga, Kimiya; Uebayashi, Akiko; Shimura, Ryoji; Inoue, Masako; Momose, Kunikazu; Masatomi, Hiroyuki; Kitazawa, Takio; Hiraga, Takeo; Subramanian, Annamalai
2012-07-01
Red-crowned cranes (Grus japonensis) are native to eastern Hokkaido (island population), in contrast to the mainland, which migrates between the Amur River basin and eastern China-Korea peninsula. During the 1990s we found that Red-crowned cranes in Hokkaido were highly contaminated with mercury: however, the source was unknown. We investigated the time trend of mercury contamination in Red-crowned cranes. Total mercury levels in the livers and kidneys from cranes dead in the 2000s were lower than those dead in the 1990s. Feather is a major pathway of mercury excretion for many bird species and is used as an indicator of blood mercury level during feather growth. As internal organs from the specimens collected before 1988 were not available, we analyzed the flight feather shavings from stuffed Red-crowned cranes dead in 1959-1987 and found that the mercury level of feathers from cranes dead in the 1960s and 1970s was not more than those from the cranes dead in the 2000s. These results suggest that mercury contamination in Red-crowned cranes in Hokkaido decreased temporally during the 1990s-2000s. This indicates the possible occurrence of some mercury pollution in Red-crowned cranes' habitat in this region in the 1990s or before.
Li, Donglai; Liu, Yu; Sun, Xinghai; Lloyd, Huw; Zhu, Shuyu; Zhang, Shuyan; Wan, Dongmei; Zhang, Zhengwang
2017-11-30
The Endangered Red-crowned Crane (Grus japonensis) is one of the most culturally iconic and sought-after species by wildlife tourists. Here we investigate how the presence of tourists influence the vigilance behaviour of cranes foraging in Suaeda salsa salt marshes and S. salsa/Phragmites australis mosaic habitat in the Yellow River Delta, China. We found that both the frequency and duration of crane vigilance significantly increased in the presence of wildlife tourists. Increased frequency in crane vigilance only occurred in the much taller S. salsa/P. australis mosaic vegetation whereas the duration of vigilance showed no significant difference between the two habitats. Crane vigilance declined with increasing distance from wildlife tourists in the two habitats, with a minimum distance of disturbance triggering a high degree of vigilance by cranes identified at 300 m. The presence of wildlife tourists may represent a form of disturbance to foraging cranes but is habitat dependent. Taller P. australis vegetation serves primarily as a visual obstruction for cranes, causing them to increase the frequency of vigilance behaviour. Our findings have important implications for the conservation of the migratory red-crowned crane population that winters in the Yellow River Delta and can help inform visitor management.
Tensor and Spin Representations of SO(4) and Discrete Quantum Gravity
NASA Astrophysics Data System (ADS)
Lorente, M.; Kramer, P.
Starting from the defining transformations of complex matrices for the SO(4) group, we construct the fundamental representation and the tensor and spinor representations of the group SO(4). Given the commutation relations for the corresponding algebra, the unitary representations of the group in terms of the generalized Euler angles are constructed. These mathematical results help us to a more complete description of the Barret-Crane model in Quantum Gravity. In particular a complete realization of the weight function for the partition function is given and a new geometrical interpretation of the asymptotic limit for the Regge action is presented.
Fronczak, David L.; Andersen, David E.; Hanna, Everett E.; Cooper, Thomas R.
2015-01-01
Several surveys have documented the increasing population size and geographic distribution of Eastern Population greater sandhill cranes Grus canadensis tabida since the 1960s. Sport hunting of this population of sandhill cranes started in 2012 following the provisions of the Eastern Population Sandhill Crane Management Plan. However, there are currently no published estimates of Eastern Population sandhill crane survival rate that can be used to inform harvest management. As part of two studies of Eastern Population sandhill crane migration, we deployed solar-powered global positioning system platform transmitting terminals on Eastern Population sandhill cranes (n = 42) at key concentration areas from 2009 to 2012. We estimated an annual survival rate for Eastern Population sandhill cranes from data resulting from monitoring these cranes by using the known-fates model in the MARK program. Estimated annual survival rate for adult Eastern Population sandhill cranes was 0.950 (95% confidence interval = 0.885–0.979) during December 2009–August 2014. All fatalities (n = 5) occurred after spring migration in late spring and early summer. We were unable to determine cause of death for crane fatalities in our study. Our survival rate estimate will be useful when combined with other population parameters such as the population index derived from the U.S. Fish and Wildlife Service fall survey, harvest, and recruitment rates to assess the effects of harvest on population size and trend and evaluate the effectiveness of management strategies.
Two-slot coiled coaxial cable resonator: reaching critical coupling at a reduced number of coils.
Hefferman, Gerald; Chen, Zhen; Wei, Tao
2014-11-01
This paper reports the experimental demonstration of a coiled coaxial cable resonator capable of meeting the critical coupling condition using a reduced number of coils relative to previously reported coiled resonators. By introducing a second slot along the length of the device, a two-slot coiled coaxial cable resonator was fabricated and critical coupling observed at 22 turns. An additional device with one-slot, but otherwise identically constructed, was also fabricated. After 44 turns, the one-slot device had yet to reach critical coupling. An ultrahigh signal-to-noise ratio (greater than 70 dB) was observed at critical coupling of the two-slot device. This reduction in number of slots necessary to reach critical coupling, and the corresponding reduction of physical length of the device, makes this demonstration of the control of critical coupling a potentially important step towards the successful application of coiled coaxial cable resonators to microwave communication and robust sensing applications.
Hirose, H
1997-01-01
This paper proposes a new treatment for electrical insulation degradation. Some types of insulation which have been used under various circumstances are considered to degrade at various rates in accordance with their stress circumstances. The cross-linked polyethylene (XLPE) insulated cables inspected by major Japanese electric companies clearly indicate such phenomena. By assuming that the inspected specimen is sampled from one of the clustered groups, a mixed degradation model can be constructed. Since the degradation of the insulation under common circumstances is considered to follow a Weibull distribution, a mixture model and a Weibull power law can be combined. This is called The mixture Weibull power law model. By using the maximum likelihood estimation for the newly proposed model to Japanese 22 and 33 kV insulation class cables, they are clustered into a certain number of groups by using the AIC and the generalized likelihood ratio test method. The reliability of the cables at specified years are assessed.
77 FR 73265 - Airworthiness Directives; Erickson Air-Crane Incorporated Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-10
... Airworthiness Directives; Erickson Air-Crane Incorporated Helicopters AGENCY: Federal Aviation Administration... Erickson Air-Crane Incorporated (Erickson) Model S-64F helicopters. This AD requires inspecting for... service information identified in this AD, contact Erickson Air-Crane Incorporated, ATTN: Chris Erickson...
NASA Astrophysics Data System (ADS)
Shutova, M. N.; Skibin, G. M.; Evtushenko, S. I.
2017-11-01
The paper is devoted to the problem of definition of availability index of deforming building construction in atypical cases. The authors revealed a real applicability of the finite-elements analyses package, such as ANSYS, for engineering testing calculations of building constructions and determination of the sites of increased stresses. It was determined that stresses increased up to 7.75 times in the sites with mechanical defects (for steel crane girder); also, the authors revealed the convergence of the calculation results between the finite element method and a usual decision using the strength of materials (in the limits 2-14% for steel truss frame). The equivalent stresses don’t exceed the maximum permissible tension for this type of steel. The building constructions have a limited availability index.
Disseminated visceral coccidiosis in sandhill cranes
Carpenter, J.W.; Novilla, M.N.; Fayer, R.; Iverson, G.C.
1984-01-01
Disseminated visceral coccidiosis (DVC) caused by Eimeria spp was first recognized as a disease entity in captive sandhill cranes (Grus canadensis) and whooping cranes (G americana) at the Patuxent Wildlife Research Center. Because cranes produced at the Center are reintroduced to the wild to augment wild populations, studies involving both experimentally induced and natural infections were initiated to determine the potential or actual occurrence of DVC in wild Gruidae. Nine sandhill cranes dosed orally with eimerian oocysts of wild origin developed lesions characteristic of DVC. Extraintestinal granulomas associated with developing schizonts were found in 6 birds. Similar lesions were observed in wild sandhill cranes throughout parts of midwestern United States, Alaska, and Saskatchewan. These studies revealed the wide geographic distribution and the high frequency of occurrence of DVC in wild cranes.
Fakarayi, Togarasei; Mashapa, Clayton; Gandiwa, Edson; Kativu, Shakkie
2016-01-01
Three species of cranes are distributed widely throughout southern Africa, but little is known about how they respond to the changes in land-use that have occurred in this region. This study assessed habitat preference of the two crane species across land-use categories of the self contained small scale commercial farms of 30 to 40 ha per household (A1), large scale commercial agriculture farms of > 50 ha per household (A2) and Old Resettlement, farms of < 5 ha per household with communal grazing land in Driefontein Grasslands Important Bird Area (IBA), Zimbabwe. The study further explored how selected explanatory (environmental) habitat variables influence crane species abundance. Crane bird counts and data on influencing environmental variables were collected between June and August 2012. Our results show that varying land-use categories had an influence on the abundance and distribution of the Wattled Crane (Bugeranus carunculatus) and the Grey Crowned Crane (Belearica regulorum) across Driefontein Grasslands IBA. The Wattled Crane was widely distributed in the relatively undisturbed A2 farms while the Grey Crowned Crane was associated with the more disturbed land of A1 farms, Old Resettlement and its communal grazing land. Cyperus esculentus and percent (%) bare ground were strong environmental variables best explaining the observed patterns in Wattled Crane abundance across land-use categories. The pattern in Grey Crowned Crane abundance was best explained by soil penetrability, moisture and grass height variables. A holistic sustainable land-use management that takes into account conservation of essential habitats in Driefontein Grasslands IBA is desirable for crane populations and other wetland dependent species that include water birds.
Population recovery of the Whooping Crane with emphasis on reintroduction efforts: Past and future
Ellis, D.H.; Lewis, J.C.; Gee, G.F.; Smith, D.G.
1992-01-01
The U.S. Fish and Wildlife Service (USFWS) began building a captive whooping crane (Grus americana) colony at Patuxent Wildlife Research Center (Patuxent), Maryland, in 1966. From 1976 to 1984, 73 eggs from this colony and 216 eggs from Wood Buffalo National Park (Wood Buffalo), Canada, nests were placed in sandhill crane (G. canadensis) nests at Grays Lake National Wildlife Refuge (Grays Lake), Idaho, the site of the first whooping crane reintroduction attempt. Although 84 chicks fledged from the 289 eggs, the egg transfer program has been discontinued because of inordinately high mortality (only ca. 13 birds remain in the wild in 1991) and lack of breeding in survivors. In recent decades new methods have emerged for introducing captive-produced offspring to the wild. Surrogate studies with sandhill cranes, particularly the endangered Mississippi sandhill cranes (G. c. pulla), have shown that young cranes, raised either by captive, conspecific foster parents, or by costumed humans and in close association with live cranes and lifelike crane taxidermic dummies, have high post-release survival rates. These techniques will likely be used in future whooping crane reintroduction programs. Current recovery objectives for the whooping crane include expansion of the 2 captive colonies, establishment of a third captive colony in Canada, and reintroduction of 2 additional wild populations. The Kissimmee Prairie in central Florida has been selected for the next release experiment. Evaluation of this site began in 1984, and risk assessment is expected to begin in 1992 with the transfer and monitoring of a group of captive-reared, juvenile whooping cranes. These 'tests of the environment' will, if results are favorable, be followed by a full-scale reintroduction effort of at least 20 birds/year beginning in 1994 or 1995.
View southwest of 350ton crane, showing one of four castings ...
View southwest of 350-ton crane, showing one of four castings which support a stationary, tapered steel girder structure called a "tower". This tower is located within an outer rotating framework designated as the "pintle" of the 350-ton crane. The whole crane pivots around bearing at the top of this tapered support tower. - Naval Base Philadelphia-Philadelphia Naval Shipyard, 350-Ton Hammerhead Crane, League Island, Philadelphia, Philadelphia County, PA
Strengthening of bridges by post-tensioning using monostrands in substituted cable ducts
NASA Astrophysics Data System (ADS)
Klusáček, Ladislav; Svoboda, Adam
2017-09-01
Post-tensioning is suitable, reliable and durable method of strengthening existing engineering structures, especially bridges. The high efficiency of post-tensioning can be seen in many applications throughout the world. In this paper the method is extended by a structural system of substituted cable ducts, which allows for significantly widening application of prestressing so it’s convenient mostly for application on beam bridges or slab bridges (built in years 1920 - 1960). The method of substituted cable ducts is based on theoretical knowledge and technical procedures, which were made possible through the development in prestressing systems, particularly the development of prestressing tendons (monostrands) and encased anchorages, as well as progress in drilling technology. This technique is highly recommended due to minimization of interventions into the constructions, unseen method of cable arrangement and hence the absence of impact on appearance, which is appreciated not only in case of valuable historical structures but also in general. It is possible to summarise that posttensioning by monostrands in substituted cable ducts is a highly effective method of strengthening existing bridges in order to increase their load capacities in terms of current traffic load and to extend their service life.
Use of an inactivated eastern equine encephalitis virus vaccine in cranes
Carpenter, J.W.; Dein, F.J.; Clark, G.G.; Watts, D.M.; Crabbs, C.L.
1986-01-01
An unprecedented outbreak of fatal eastern equine encephalitis (EEE) virus occurred during the late summer and fall of 1984 in endangered whooping cranes (Grus americana) at the Patuxent Wildlife Research Center, Laurel, Maryland. As part of efforts to prevent future epizootics of EEE. studies were conducted to evaluate the antibody response of cranes following vaccination with a formalin-inactivated EEE virus vaccine. Viral specific neutralizing antibody was elicited in sandhill cranes (Grus canadensis) and whooping cranes following 1M inoculation with the vaccine. Among the 1M-inoculated cranes, peak antibody titers of 1:80 on days 30 to 60 had waned to undetectable levels by days 90 to 120. Although the initial titers were not increased by the first booster dose, the duration of the antibody was extended considerably. Whooping cranes, receiving vaccine 6 months after their first vaccination, developed titers of 1:80 to 1:320 by day 30. At 45 days after the final vaccination, these titers had dropped to 1:10 to 1:160. Cranes with preexisting EEE virus antibody, apparently reflecting natural infection, exhibited an anamnestic response indicated by a rapid increase and sustained high antibody titer. Even though EEE virus vaccine induced neutralizing antibody and produced no adverse side effects, further studies will be required to assess the significance of this response as a strategy for protecting whooping cranes against natural EEE virus infection. The loss of captive whooping cranes to the EEE virus presented a previously unrecognized risk and obstacle to recovery of this species. Not only was, there a setback in the captive breeding and reintroduction program for the whooping crane, but, because of the susceptibility of the species to the EEE virus. establishment of additional crane populations may be more complicated than initially envisioned. However, through continued surveillance, serological monitoring, and vaccination activities, we are confident that the impact of EEE virus on whooping crane recovery can be overcome to the ultimate benefit of this endangered species.
Austin, Jane E.
2012-01-01
The main conflicts between Sandhill Cranes (Grus canadensis) and farmers in western United States occur in the Rocky Mountain region during migration and wintering periods. Most crop damage by cranes occurs in mature wheat (Triticum aestivum) and barley (Hordeum vulgare), young shoots of alfalfa (Medicago sativa) and cereal grains, chilies (Capsicum annuum), and silage corn (Zea mays). Damage is related to proximity of crop fields to roost sites and timing of crane concentrations relative to crop maturity or vulnerability. The evolution of conflicts between farmers and cranes and current solutions are described for two areas of the Rocky Mountains used by staging, migrating, or wintering cranes: Grays Lake, Idaho, and the Middle Rio Grande Valley, New Mexico. In both areas, conflicts with growing crane populations were aggravated by losses of wetlands and cropland, proximity of crops to roosts and other wetland areas, changing crop types and practices, and increasing urbanization. At Grays Lake, fall-staging cranes damaged barley fields near an important breeding refuge as well as fields 15-50 km away. In the Middle Rio Grande Valley, migrating and wintering cranes damaged young alfalfa fields, chilies, and silage corn. Solutions in both areas have been addressed through cooperative efforts among federal and state agencies, that manage wetlands and croplands to increase food availability and carrying capacity on public lands, provide hazing programs for private landowners, and strategically target crane hunting to problem areas. Sustaining the success of these programs will be challenging. Areas important to Sandhill Cranes in the western United Sates experience continued loss of habitat and food resources due to urbanization, changes in agricultural crops and practices, and water-use conflicts, which threaten the abilities of both public and private landowners to manage wetlands and croplands for cranes. Conservation of habitats and water resources are important to support crane populations and minimize future conflicts with agriculture.
46 CFR 109.521 - Cranes: General.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Cranes: General. 109.521 Section 109.521 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes... maintained in accordance with the API Recommended Practice for Operation and Maintenance of Offshore Cranes...
46 CFR 109.521 - Cranes: General.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cranes: General. 109.521 Section 109.521 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes... maintained in accordance with the API Recommended Practice for Operation and Maintenance of Offshore Cranes...
46 CFR 109.521 - Cranes: General.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Cranes: General. 109.521 Section 109.521 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes... maintained in accordance with the API Recommended Practice for Operation and Maintenance of Offshore Cranes...
46 CFR 109.521 - Cranes: General.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Cranes: General. 109.521 Section 109.521 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes... maintained in accordance with the API Recommended Practice for Operation and Maintenance of Offshore Cranes...
46 CFR 109.521 - Cranes: General.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Cranes: General. 109.521 Section 109.521 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes... maintained in accordance with the API Recommended Practice for Operation and Maintenance of Offshore Cranes...
Mortality of globally threatened Sarus cranes Grus antigon from monocrotophos poisoning in India.
Pain, D J; Gargi, R; Cunningham, A A; Jones, A; Prakash, V
2004-06-29
Globally threatened Sarus cranes Grus antigon are resident at Keoladeo National Park World Heritage site and the surrounding area near Bharatpur, Western Rajasthan, India. In winter, they are joined by c. 200 wintering common cranes Grus grus. On 23 November 2000, 15 Sarus cranes and three common cranes were found dead in a field adjacent to the park, where wheat seed had been sown the previous day. Chemical analyses of seed samples from the field and the cranes' alimentary tract contents identified residues of the organophosphate insecticide monocrotophos. Monocrotophos concentrations of 0.8 and 1.8 ppm were found in wheat samples, and 0.2-0.74 ppm (x=0.33) in the alimentary tract contents of five of the seven cranes examined. No other organophosphate or organochlorine pesticides were detected. We conclude that the cranes died from monocrotophos poisoning after eating treated seed. We discuss similar incidents of avian mortality, and recommend that measures be taken to reduce these. Copryright 2003 Elsevier B.V.
Promoting wildness in sandhill cranes conditioned to follow an ultralight aircraft
Duff, J.W.; Lishman, W.A.; Clark, D.A.; Gee, G.F.; Sprague, D.T.; Ellis, D.H.
2001-01-01
During the 1998 field season, we developed and tested a new protocol to teach sandhill cranes (Grus canadensis) to follow ultralight aircraft yet avoid humans. Although successful in teaching the cranes a migration route, our previous migration (1997) resulted in birds that were overly tame and sought association with humans. For this study, 16 sandhill cranes were costume-reared at USGS Patuxent Wildlife Research Center and transported to Ontario shortly before fledging. After the birds learned to follow the aircraft, 14 were transported to an isolated wintering site in South Carolina, 1300 km south of the training area. Twelve arrived safely. Eleven of 12 birds survived the winter. All of these 11 cranes moved north to Cape Hatteras in early May. Thereafter, 6 of the cranes were captured and translocated to northern New York state. The remaining 5 returned to South Carolina, autumn 1999. Prior to capture, although the cranes sometimes allowed humans to approach them, none of the cranes approached buildings or humans.
Bysykatova, Inga P.; Krapu, Gary L.; Germogenov, Nicolai I.; Buhl, Deborah A.; Aborn, David
2014-01-01
The Siberian crane (Grus leucogeranus) is the third rarest crane species in the world with a breeding range now centered on 3 core areas and a buffer zone in the arctic of northern Yakutia in northeastern Russia. During 16 July-2 August 2009, we undertook ground surveys within the Khroma River core breeding area, surrounding buffer zone, and lands lying to the west of the known rbeeding range to estimate densities and determine habitat use and social status of Siberian cranes. A total of 142 Siberian cranes were sighted (including 55 pairs) at 54 locations with 32 cranes (including 13 pairs) sighted outside the currently known breeding range in the lower drainages of the Syalakh and Syuryuktyakh Rivers. After adjusting for a probability of detection of 0.484 (95% CI = 0.281-0.833), Siberian crane densities in the Khroma core area and the buffer zone averaged 0.0921 cranes/km2 and 0.0363 cranes/km2, respectively. A majority of cranes (n = 93 [65%]) occurred in complexes of large basin wetlands, with use centered in those having extensive beds of pendant grass (Arctophila fulva). Of the 142 cranes seen, 110 (77%) were paired, 21 (15%) were singles, and 11 (8%) were in groups of 3-5. The Khroma core supports 1 of 2 large concentrations of breeding Siberian cranes remaining in the wild; therefore, we recommend that consideration be given to designating a nature reserve that would encompass the Khroma core, adjacent buffer zone, and lands to the west (including coastal tundra areas along the lower drainages of the Syalah and Syuryuktyah Rivers). Further research is needed to gain additional insight into Siberian crane distribution and numbers on lands beyond the currently delineated western boundary of the Siberian crane breeding range in the Ust-Yana District of northern Yakutia. Important gaps remain in information needed to effectively guide conservation efforts for the Eastern Population, and recent advances in remote tracking technology offer potential opportunities to help address several key information needs.
Shan, Ji-Hong; Ma, Jian-Zhang; Li, Yan-Kuo; Qian, Fa-Wen; Tu, Xiao-Bin
2012-08-01
Using simultaneous land surveys, we monitored the population size and spatial distribution of wintering Siberian cranes at 64 lakes around Poyang Lake between 1998 and 2010. The results showed that 46 lakes were inhabited by wintering cranes, and in 25 of those, the number of wintering cranes accounted for more than 1% of the Siberian cranes' global population. The lakes where over 40.0% of the global population, e.g. 1 280 individuals, included Dachahu Lake in Jiujiang region, and Banghu Lake and Candouhu Lake in the Poyang Lake Nature Reserve. The average yearly population of the wintering Siberian crane in the Poyang lakes was 3 108±849, with the maximum of 4 004 individuals in winter 2002. On the whole, there was no drastic fluctuation, but population numbers have shown considerable fluctuation since 2003. We also found the Poyang Lake Nature Reserve was the major wintering area of the Siberian crane, with over 60% of Siberian cranes wintering in the reserve since 2002 (except in 2006). Most of the inhabited lakes are covered in existing nature reserves, though some lakes outside the reserve were also considerably used by Siberian cranes.
Mummert, D.P.; Ellis, D.H.; Chambers, C.L.
2001-01-01
In 1995 and 1996, we trained 2 groups of costume-reared greater sandhill cranes (Grus canadensis tabida) (10 in 1995, 14 in 1996) to follow a truck. Thereafter we led 10 in 1995 and 12 in 1996 from Garland Prairie, northern Arizona, to the Buenos Aires National Wildlife Refuge, southern Arizona (ca. 620 km). These techniques were being developed to create additional, disjunct populations of the whooping crane (G. americana). The cranes taught the migration route in 1995 did not follow the desired migration route in 1996 but did travel north 140 km along the route in spring 1997. By the summer of 1997, we did not know the locations of any of these birds. Results were better for the 1996 tracking cranes. Between 1997 and 1999 there was a 92% (11 of 12) success rate for the 1996 trucking cranes with known locations flying unassisted from the summering to wintering grounds. Through 1999, 7 of the 12 cranes became lost on flights from the wintering to summering grounds. (Some of the trucking cranes apparently followed wild cranes to or toward breeding grounds.)
46 CFR 111.15-20 - Conductors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-20 Conductors. (a) Each conductor penetration to a battery room must be made watertight. (b) The termination of each cable...
46 CFR 111.15-20 - Conductors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-20 Conductors. (a) Each conductor penetration to a battery room must be made watertight. (b) The termination of each cable...
46 CFR 111.15-20 - Conductors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-20 Conductors. (a) Each conductor penetration to a battery room must be made watertight. (b) The termination of each cable...
46 CFR 111.15-20 - Conductors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-20 Conductors. (a) Each conductor penetration to a battery room must be made watertight. (b) The termination of each cable...
46 CFR 111.15-20 - Conductors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-20 Conductors. (a) Each conductor penetration to a battery room must be made watertight. (b) The termination of each cable...
''Football'' test coil: a simulated service test of internally-cooled, cabled superconductor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marston, P.G.; Iwasa, Y.; Thome, R.J.
Internally-cooled, cabled superconductor, (ICCS), appears from small-scale tests to be a viable alternative to pool-boiling cooled superconductors for large superconducting magnets. Potential advantages may include savings in helium inventory, smaller structure and ease of fabrication. Questions remain, however, about the structural performance of these systems. The ''football'' test coil has been designed to simulate the actual ''field-current-stress-thermal'' operating conditions of a 25 ka ICCS in a commercial scale MHD magnet. The test procedure will permit demonstration of the 20 year cyclic life of such a magnet in less than 20 days. This paper describes the design, construction and test ofmore » that coil which is wound of copper-stabilized niobium-titanium cable in steel conduit. 2 refs.« less
Overview of hybrid fiber-coaxial network deployment in the deregulated UK environment
NASA Astrophysics Data System (ADS)
Cox, Alan L.
1995-11-01
Cable operators in the U.K. enjoy unprecedented license to construct networks and operate cable TV and telecommunications services within their franchise areas. In general, operators have built hybrid-fiber-coax (HFC) networks for cable TV in parallel with fiber-copper-pair networks for telephony. The commonly used network architectures are reviewed, together with their present and future capacities. Despite this dual-technology approach, there is considerable interest in the integration of telephony services onto the HFC network and the development of new interactive services for which HFC may be more suitable than copper pairs. Certain technological and commercial developments may have considerable significance for HFC networks and their operators. These include the digitalization of TV distribution and the rising demand for high-rate digital access lines. Possible scenarios are discussed.
New tension band material for fixation of transverse olecranon fractures: a biomechanical study.
Lalonde, James Allen; Rabalais, R David; Mansour, Alfred; Burger, Evalina L; Riemer, Barry L; Lu, Yun; Baratta, Richard V
2005-10-01
This study tested the use of braided polyethylene cable as an option for repairing transverse olecranon fractures. Six cadaveric elbows underwent a transverse olecranon osteotomy followed by fixation with tension band constructs using 18-gauge wire and Secure-Strand (U.S. Surgical, North Haven, Conn). Distraction forces up to 450 N were applied to the triceps tendon while measuring fracture displacement with an extensometer. The average maximal fracture gap with the standard AO tension band technique using stainless steel wire was 0.66 +/- 0.43 mm, as opposed to 0.68 +/- 0.45 mm with braided polyethylene cable. A paired t test indicated no significant difference between the two materials. These results support the feasibility of braided polyethylene cable as an alternative to the standard steel-wire tension band.
30 CFR 57.16014 - Operator-carrying overhead cranes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...
30 CFR 56.16014 - Operator-carrying overhead cranes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...
30 CFR 56.16014 - Operator-carrying overhead cranes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...
30 CFR 57.16014 - Operator-carrying overhead cranes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...
Molecular Characterization of Bacterial Populations in Sandhill Crane Feces
Sandhill cranes have the potential to be important seasonal sources of waterborne fecal bacteria; however, it is currently not possible to measure the extent of crane fecal pollution in potentially impacted areas as there are no available crane-specific assays. This is in part d...
Hausmann, Jennifer C; Cray, Carolyn; Hartup, Barry K
2015-09-01
Protein electrophoresis of serum samples from endangered, wild whooping cranes ( Grus americana ) was performed to help assess the health of the only self-sustaining, migratory population in North America. Serum samples from wild adult cranes (n = 22) were taken at Aransas National Wildlife Refuge, Texas, USA during winter. Wild juvenile cranes (n = 26) were sampled at Wood Buffalo National Park, Northwest Territories, Canada, in midsummer. All captive crane samples were acquired from the International Crane Foundation, Baraboo, WI, USA. Captive adult cranes (n = 30) were sampled during annual examinations, and archived serum samples from captive juvenile cranes (n = 19) were selected to match the estimated age of wild juveniles. Wild juveniles had significantly lower concentrations of all protein fractions than wild adults, except for prealbumin and γ globulins. All protein fraction concentrations for wild juveniles were significantly lower compared with captive juveniles, except for prealbumin and γ globulins, which were higher. Wild adults had significantly greater γ globulin concentrations than captive adults. Captive juveniles had significantly lower prealbumin and albumin concentrations and albumin : globulin ratios than captive adults. The higher γ globulin concentrations in wild versus captive cranes are likely because of increased antigenic exposure and immune stimulation. Protein fraction concentrations vary significantly with age and natural history in this species. Reference intervals for serum protein electrophoresis results from captive adult whooping cranes are provided in this study.
The influence of diet composition upon growth and development of sandhill cranes
Serafin, J.A.
1982-01-01
Experiments were conducted to evaluate the effect of protein, metabolizable energy, and sulfur amino acid content of five diets upon growth and development of captive Florida Sandhill Crane (Grus canadensis pratensis) and Greater Sandhill Crane (G. c. tabida) chicks raised under controlled conditions. A high protein (32%) diet resulted in faster growth than that obtained when a lower protein (24%) ration was supplied. Florida Sandhill Crane chicks fed a diet containing 2,160 kcal/kg grew significantly slower than chicks fed a ration containing 2,830 kcal/kg. Reducing the sulfur amino acid content of a ration containing 24% protein from 0.88% to 0.73% significantly slowed the growth of young cranes. A 17% incidence of leg disorders and a 25% incidence of wing abnormalities occurred between 7 and 28 days of age among Greater Sandhill Cranes fed a high protein diet. Florida Sandhill Cranes grew slower than Greater Sandhill Cranes irrespective of the type of ration they were provided and did not develop leg or wing abnormalities. Abnormalities invariably developed only in the most rapidly growing Greater Sandhill Cranes. Diets that promoted slower growth reduced the incidence of abnormalities. A ration formulated to contain a low (0.73%) sulfur amino acid level appeared to be the most suitable for slowing growth rates of captive-reared Sandhill Cranes and reducing the risk of abnormaiwing or leg development.
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
46 CFR 109.525 - Cranes: Working loads.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Cranes: Working loads. 109.525 Section 109.525 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Cranes § 109.525 Cranes: Working loads. The master or person in charge shall ensure that tables...
33 CFR 150.555 - How must cranes be maintained?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false How must cranes be maintained? 150.555 Section 150.555 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY... Operations § 150.555 How must cranes be maintained? Cranes must be operated, maintained, and tested in...
46 CFR 109.439 - Crane certificates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Crane certificates. 109.439 Section 109.439 Shipping... Reports, Notifications, and Records Records § 109.439 Crane certificates. The master or person in charge shall insure that the following certificates and records for each crane are maintained on the unit: (a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-18
... INTERNATIONAL TRADE COMMISSION [Docket No. 2960] Certain Crawler Cranes and Components Thereof... Trade Commission has received a complaint entitled Certain Crawler Cranes and Components Thereof, DN...) of the Commission's Rules of Practice and Procedure filed on behalf of Manitowoc Cranes, LLC on June...
33 CFR 150.555 - How must cranes be maintained?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false How must cranes be maintained? 150.555 Section 150.555 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY... Operations § 150.555 How must cranes be maintained? Cranes must be operated, maintained, and tested in...
46 CFR 109.439 - Crane certificates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Crane certificates. 109.439 Section 109.439 Shipping... Reports, Notifications, and Records Records § 109.439 Crane certificates. The master or person in charge shall insure that the following certificates and records for each crane are maintained on the unit: (a...
While the microbial water quality in the Platte River is seasonally impacted by excreta from migrating cranes, there are no methods available to study crane fecal contamination. Here we characterized microbial populations in crane feces using phylogenetic analysis of 16S rRNA gen...
29 CFR 1918.55 - Cranes (See also § 1918.11).
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Operator's station. (1) Cranes with missing, broken, cracked, scratched, or dirty glass (or equivalent... shall not be used except in an emergency or during non-cargo handling operations such as stowing cranes... shall not be used if control levers operate with excessive friction or excessive play. (6) When cranes...
46 CFR 109.437 - Crane record book.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Crane record book. 109.437 Section 109.437 Shipping... Reports, Notifications, and Records Records § 109.437 Crane record book. The master or person in charge shall ensure that the following are maintained in a crane record book: (a) Descriptive information which...
46 CFR 109.437 - Crane record book.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Crane record book. 109.437 Section 109.437 Shipping... Reports, Notifications, and Records Records § 109.437 Crane record book. The master or person in charge shall ensure that the following are maintained in a crane record book: (a) Descriptive information which...
46 CFR 109.437 - Crane record book.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Crane record book. 109.437 Section 109.437 Shipping... Reports, Notifications, and Records Records § 109.437 Crane record book. The master or person in charge shall ensure that the following are maintained in a crane record book: (a) Descriptive information which...
46 CFR 109.437 - Crane record book.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Crane record book. 109.437 Section 109.437 Shipping... Reports, Notifications, and Records Records § 109.437 Crane record book. The master or person in charge shall ensure that the following are maintained in a crane record book: (a) Descriptive information which...
46 CFR 109.437 - Crane record book.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Crane record book. 109.437 Section 109.437 Shipping... Reports, Notifications, and Records Records § 109.437 Crane record book. The master or person in charge shall ensure that the following are maintained in a crane record book: (a) Descriptive information which...
Research on Chinese Intelligent Guanglianda in High-rise Construction
NASA Astrophysics Data System (ADS)
Romanovich, Marina; Shi, Peiyu; Wang, Ziyue; Zhao, Liang; Gerasimova, Vera
2018-03-01
Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.