Sample records for cago acquisition operating

  1. GPHS-RTGs in support of the Cassini RTG Program

    NASA Astrophysics Data System (ADS)

    1995-04-01

    The technical progress achieved during the period 26 Sep. 1994 - 2 Apr. 1995 on Contract DE-AC03-91SF-18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 Feb. - 2 Apr. 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds).

  2. GPHS-RTGs in support of the Cassini Mission

    NASA Astrophysics Data System (ADS)

    1994-10-01

    The progress on the radioisotope generators and ancillary activities is described. This report is organized by program task as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; design, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contractor acquired government owned property (CAGO) acquisition.

  3. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1992-04-01

    The technical progress achieved during the period 30 Mar. - 27 Sep. 1992 is described. Topics covered include: spacecraft integration and liaison; engineering support; safety; qualified unicouple production, ETG fabrication, assembly, and test; ground support equipment; radioisotope thermoelectric generators (RTG) shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, non-capital contractor acquired government owned (CAGO) acquisitions, and CAGO maintenance; and CAGO acquisitions.

  4. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1994-04-01

    This report is organized by the program task structure as follows: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple fabrication; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance and reliability, contract changes, noncapital contractor acquired government owned property (CAGO) acquisition, and CAGO maintenance; and (10) CAGO acquisition.

  5. Design, fabricate, and provide engineering support for radiosotope thermoelectric generators for NASA'S CRHF and CASSINI missions

    NASA Astrophysics Data System (ADS)

    The technical progress achieved during the period 11 January through 31 March 1991 on Contract DE-AC03-91SF18852.000 Radioisotope Thermoelectric Generators and ancillary activities is described. The system contract consists of the following tasks: (1) Spacecraft Integration and Liaison; (2) Engineering Support; (3) Safety; (4) Qualify Unicouple Fabrication; (5) ETG Fabrication, Assembly and Test; (6) GSE; (7) RTG Shipping and Launch Support; (8) Designs, Reviews, and Mission Applications; (9) Project Management, Quality Assurance and Reliability; and (10) CAGO Acquisition (Capital Funds). The progress achieved is broken down into these tasks.

  6. Graphene oxide as a nanocarrier for controlled release and targeted delivery of an anticancer active agent, chlorogenic acid.

    PubMed

    Barahuie, Farahnaz; Saifullah, Bullo; Dorniani, Dena; Fakurazi, Sharida; Karthivashan, Govindarajan; Hussein, Mohd Zobir; Elfghi, Fawzi M

    2017-05-01

    We have synthesized graphene oxide using improved Hummer's method in order to explore the potential use of the resulting graphene oxide as a nanocarrier for an active anticancer agent, chlorogenic acid (CA). The synthesized graphene oxide and chlorogenic acid-graphene oxide nanocomposite (CAGO) were characterized using Fourier transform infrared (FTIR) spectroscopy, thermogravimetry and differential thermogravimetry analysis, Raman spectroscopy, powder X-ray diffraction (PXRD), UV-vis spectroscopy and high resolution transmission electron microscopy (HRTEM) techniques. The successful conjugation of chlorogenic acid onto graphene oxide through hydrogen bonding and π-π interaction was confirmed by Raman spectroscopy, FTIR analysis and X-ray diffraction patterns. The loading of CA in the nanohybrid was estimated to be around 13.1% by UV-vis spectroscopy. The release profiles showed favourable, sustained and pH-dependent release of CA from CAGO nanocomposite and conformed well to the pseudo-second order kinetic model. Furthermore, the designed anticancer nanohybrid was thermally more stable than its counterpart. The in vitro cytotoxicity results revealed insignificant toxicity effect towards normal cell line, with a viability of >80% even at higher concentration of 50μg/mL. Contrarily, CAGO nanocomposite revealed enhanced toxic effect towards evaluated cancer cell lines (HepG2 human liver hepatocellular carcinoma cell line, A549 human lung adenocarcinoma epithelial cell line, and HeLa human cervical cancer cell line) compared to its free form. Copyright © 2016 Elsevier B.V. All rights reserved.

  7. Crime Scene Intelligence. An Experiment in Forensic Entomology

    DTIC Science & Technology

    2006-11-01

    Investigation (Boca Raton, FL: CRC Press, 1993), 72. 23 Smith, 86. 24 G. Bianchini, “La Biologia Del Cadaver, ” Archivic Antropologia...May R. Ninety-Nine More Maggots, Mites, and Munchers. Urbana and Chi- cago: University of Illinois Press, 1985. Bianchini, G. “La Biologia Del

  8. Development of a stable cation modified graphene oxide membrane for water treatment

    NASA Astrophysics Data System (ADS)

    Yu, Wenzheng; (Yet Yu, Tong; Graham, Nigel

    2017-12-01

    Membranes prepared from layers of graphene oxide (GO) offer substantial advantages over conventional materials for water treatment (e.g. greater flux), but the stability of GO membranes in water has not been achieved until now. In this study the behavior of GO membranes prepared with different quantities and species of cations has been investigated to establish the feasibility of their application in water treatment. A range of cation-modified GO membranes were prepared and exposed to aqueous solutions containing specific chemical constituents. In pure water, unmodified and Na-modified GO membranes were highly unstable, while GO membranes modified with multivalent cations were stable provided there were sufficient quantities of cations present; their relative capability to achieve GO stability was as follows: Al3+  >  Ca2+  >  Mg2+  >  Na+. It is believed that the mechanism of cross-linking, and membrane stability, is via metal-carboxylate chelates and cation-graphite surface interactions (cation-π interaction), and that the latter appears to increase with increasing cation valency. The instability of cation (Ca or Al)-modified GO membranes by NaCl solutions during permeation occurred as Na+ exchanged with the incorporated multivalent cations, but a high content of Al3+ in the GO membrane impeded Al3+/Na+ exchange and thus retained membrane stability. In solutions containing biopolymers representative of surface waters or seawater (protein and polysaccharide solutions), Ca-GO membranes (even with high Ca2+ content) were not stable, while Al-GO membranes were stable if the Al3+ content was sufficiently high; Al-formed membranes also had a greater flux than Ca-GO membranes.

  9. Rail accelerator technology and applications

    NASA Technical Reports Server (NTRS)

    Zana, L. M.; Kerslake, W. R.

    1985-01-01

    Rail accelerators offer a viable means of launching ton-size payloads from the Earth's surface to space. The results of two mission studies which indicate that an Earth-to-Space Rail Launcher (ESRL) system is not only technically feasible but also economically beneficial, particularly when large amounts of bulk cago are to be delivered to space are given. An in-house experimental program at the Lewis Research Center (LeRC) was conducted in parallel with the mission studies with the objective of examining technical feasibility issues. A 1 m long - 12.5 by 12.5 mm bore rail accelerator as designed with clear polycarbonate sidewalls to visually observe the plasma armature acceleration. The general character of plasma/projectile dynamics is described for a typical test firing.

  10. Official Guard and Reserve Manpower Strengths and Statistics, FY 1987.

    DTIC Science & Technology

    1987-06-01

    InI Sr.sG au a aa at aUa a -mA a 0I at a I- a wo r, rC jo Mu cl C. .1 . a.4~a a I-S N’T 00 a aua - -w. ao aaa N, al- a caGo0a0 acca a 4=00 z .00 a0. a...N. N~Q I- Nillyh N NK hN> Nac Nh "O O N hi ND 0 in 0u N) 8 cy cu in ) NZN WN> w N9 N 0 Pn f7 U It N- w.4 N X PN Nm ’N InNI- wC)x x > 0 in NO ,V)4

  11. Agomelatine: AGO 178, AGO178, S 20098.

    PubMed

    2008-01-01

    Novartis and Servier are developing agomelatine for the treatment of depression. Agomelatine is a specific melatonin (MT1 and MT2) receptor agonist that also has antagonistic activities at serotonin-(2C) (5-HT(2C)) receptors. Novartis believes agomelatine is comparable to current standard therapies for depression with improved tolerability, including a low propensity to cause sexual dysfunction and weight gain. Clinical development is being conducted in the US for the treatment of depression; approval for this indication was declined in the EU, apparently due to insufficient data. Servier has also conducted a trial of the agent in patients with generalized anxiety disorder in France, South Africa and Finland, and a phase II trial in sleep disorders in France. In March 2006, Servier and Novartis signed a licensing agreement for agomelatine. Novartis obtained the exclusive rights for the development and marketing of agomelatine in the US and several other countries. Servier retained the rights to the product in the rest of the world. The clinical development plan for agomelatine includes phase III trials being conducted under the parAGOn clinical trial programme. One US-based trial that began in March 2007 (NCT00463242) is recruiting 490 patients with depression who will receive placebo or agomelatine 25 or 50 mg for 8 weeks and will then receive open-label agomelatine for 52 weeks. Novartis is also conducting an 8-week phase III trial (NCT00411099) comparing the safety and efficacy of agomelatine 25 and 50 mg in patients with major depressive disorder. A follow-up, 52-week open-label extension study (CAGO178A2301E) will also be conducted. Another phase III study underway is NCT00411242, which has the same design and is also followed by a 52-week open-label extension study (CAGO178A2302E). These studies are all expected to be completed by January 2009. In July 2006, the Committee for Medicinal Products for Human Use recommended the refusal of marketing authorisation for agomelatine for the treatment of depression. Servier had applied for a re-examination of the finding but withdrew the request in November 2006. Servier's MAA was not supported due to insufficient data and no recent development has been reported in this indication in the EU. Agomelatine prevented relapse in patients with depression compared with placebo and was well tolerated in an international phase III trial.

  12. 48 CFR 18.201 - Contingency operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18.201 Section 18.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is...

  13. 48 CFR 206.303-70 - Acquisitions in support of operations in Iraq or Afghanistan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operations in Iraq or Afghanistan. 206.303-70 Section 206.303-70 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 206.303-70 Acquisitions in support of operations in Iraq or...

  14. 48 CFR 1318.201 - Contingency operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  15. Multifunctional Information Distribution System (MIDS)

    DTIC Science & Technology

    2015-12-01

    UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MDAP Programs 3 Program Information 5 Responsible Office 5...Contracts 77 Deliveries and Expenditures 84 Operating and Support Cost 85 Common Acronyms and Abbreviations for MDAP Programs Acq O&M...Acquisition-Related Operations and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision Memorandum APB - Acquisition Program Baseline

  16. Standard Missile-6 (SM-6)

    DTIC Science & Technology

    2016-12-01

    and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision Memorandum APB - Acquisition Program Baseline APPN - Appropriation APUC...Acquisition Program MILCON - Military Construction N/A - Not Applicable O&M - Operations and Maintenance ORD - Operational Requirements Document OSD...RMS) Contractor Location: 1151 Hermans Road Tucson, AZ 85756 Contract Number: N00024-13-C-5407/0 Contract Type: Firm Fixed Price (FFP) Award Date

  17. Evolution Of The Operational Energy Strategy And Its Consideration In The Defense Acquisition Process

    DTIC Science & Technology

    2016-09-01

    OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS by Richard J. Kendig Ashley D. Seaton Robert J. Rodgers...project 4. TITLE AND SUBTITLE EVOLUTION OF THE OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS 5. FUNDING...looked at the DOD Operational Energy Strategy evolution and how it applies to new and modified weapon systems, considering the three-legged table of the

  18. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  19. 48 CFR 3036.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... work at operating airports. 3036.570 Section 3036.570 Federal Acquisition Regulations System DEPARTMENT... work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (HSAR) 48 CFR 3052.236-70, Special Precautions for Work at Operating Airports, in solicitations...

  20. 48 CFR 3036.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... work at operating airports. 3036.570 Section 3036.570 Federal Acquisition Regulations System DEPARTMENT... work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (HSAR) 48 CFR 3052.236-70, Special Precautions for Work at Operating Airports, in solicitations...

  1. 48 CFR 3036.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... work at operating airports. 3036.570 Section 3036.570 Federal Acquisition Regulations System DEPARTMENT... work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (HSAR) 48 CFR 3052.236-70, Special Precautions for Work at Operating Airports, in solicitations...

  2. 48 CFR 3036.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... work at operating airports. 3036.570 Section 3036.570 Federal Acquisition Regulations System DEPARTMENT... work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (HSAR) 48 CFR 3052.236-70, Special Precautions for Work at Operating Airports, in solicitations...

  3. 48 CFR 3036.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Special precautions for work at operating airports. 3036.570 Section 3036.570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SPECIAL CATEGORIES OF...

  4. Innovative UK Approaches to Acquisition Management

    DTIC Science & Technology

    2009-05-01

    Financial and Operational Imperatives Size of UK armed forces UK Industry ? Political influence PFI / PPP Increased Scrutiny - NAO “ Commercialisation “ of the...acquisition KNOWLEDGE (EXPERIENCE – Lessons learned) KNOWLEDGE (Training) KNOWLEDGE ( Education ) OPTIMAL OPERATIONAL PERFORMANCE Operational Capability UK

  5. 48 CFR 970.1706 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.1706 Section 970.1706 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706 Management and operating contracts...

  6. 48 CFR 1236.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... work at operating airports. 1236.570 Section 1236.570 Federal Acquisition Regulations System DEPARTMENT... Contract Clauses 1236.570 Special precautions for work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (TAR) 48 CFR 1252.236-70, Special Precautions...

  7. 48 CFR 1236.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... work at operating airports. 1236.570 Section 1236.570 Federal Acquisition Regulations System DEPARTMENT... Contract Clauses 1236.570 Special precautions for work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (TAR) 48 CFR 1252.236-70, Special Precautions...

  8. 48 CFR 1236.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... work at operating airports. 1236.570 Section 1236.570 Federal Acquisition Regulations System DEPARTMENT... Contract Clauses 1236.570 Special precautions for work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (TAR) 48 CFR 1252.236-70, Special Precautions...

  9. 48 CFR 1236.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... work at operating airports. 1236.570 Section 1236.570 Federal Acquisition Regulations System DEPARTMENT... Contract Clauses 1236.570 Special precautions for work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (TAR) 48 CFR 1252.236-70, Special Precautions...

  10. 48 CFR 1236.570 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... work at operating airports. 1236.570 Section 1236.570 Federal Acquisition Regulations System DEPARTMENT... Contract Clauses 1236.570 Special precautions for work at operating airports. Where any acquisition will require work at an operating airport, insert the clause at (TAR) 48 CFR 1252.236-70, Special Precautions...

  11. 48 CFR 225.7704 - Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state in support of operations in... South Asian (SC/CASA) state in support of operations in Afghanistan. ...

  12. 48 CFR 225.7704 - Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state in support of operations in... South Asian (SC/CASA) state in support of operations in Afghanistan. ...

  13. 48 CFR 970.2904-1 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.2904-1 Section 970.2904-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2904-1 Management and operating contracts. (a) Pursuant to 48 CFR 2...

  14. 78 FR 9450 - Grand Trunk Western Railroad Company-Acquisition of Operating Easement-CSX Transportation, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-08

    ... affiliate, operates over it via trackage rights. Along with the proposed easement acquisition by GTW, CSXT would retain local and overhead trackage rights over the Leewood-Aulon Line. GTW's easement acquisition is one part of an Agreement for Exchange of Perpetual Easements between GTW and CSXT. In exchange for...

  15. 48 CFR 225.7704 - Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state in support of operations in... and South Asian (SC/CASA) state in support of operations in Afghanistan. ...

  16. 48 CFR 225.7704 - Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Acquisitions of products and services from South Caucasus/Central and South Asian (SC/CASA) state in support of operations in... and South Asian (SC/CASA) state in support of operations in Afghanistan. ...

  17. Operational Test and Evaluation Manual

    DTIC Science & Technology

    2011-06-28

    Fiscal Office manages all funds received throughout the year for Operations and Maintenance Marine Corps (O&MMC); Research , Development, Test, and... Research , Development, and Acquisition) Assistant Secretary of the Navy ( Research , Development, and Acquisition) (ASN (RDA)) is the DOD’s Component...entire acquisition cycle (SECNAV 2008). This accumulation of data starts with early research and developmental testing and Other tests and

  18. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  19. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  20. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  1. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  2. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  3. 77 FR 38884 - Wyoming Connect Railroad LLC-Acquisition and Operation Exemption-Union Pacific Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35640] Wyoming Connect Railroad LLC--Acquisition and Operation Exemption--Union Pacific Railroad Company Wyoming Connect Railroad... lease from Union Pacific Railroad Company and to operate approximately 18.5 miles of rail line between...

  4. 77 FR 10617 - Wellsboro & Corning Railroad, LLC-Acquisition and Operation Exemption-Wellsboro & Corning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... & Corning Railroad, LLC--Acquisition and Operation Exemption--Wellsboro & Corning Railroad Company Wellsboro & Corning Railroad, LLC (WCLLC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wellsboro & Corning Railroad Company and to operate approximately 35.5 miles of rail...

  5. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas, Oklahoma & Eastern Railroad Company and to operate...

  6. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a) Definition... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of Facilities, Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition...

  7. 48 CFR 428.370 - Government-owned vehicles operated in foreign countries.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Government-owned vehicles operated in foreign countries. 428.370 Section 428.370 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.370 Government-owned vehicles operated in foreign countries....

  8. 48 CFR 428.370 - Government-owned vehicles operated in foreign countries.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Government-owned vehicles operated in foreign countries. 428.370 Section 428.370 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.370 Government-owned vehicles operated in foreign countries....

  9. 48 CFR 428.370 - Government-owned vehicles operated in foreign countries.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Government-owned vehicles operated in foreign countries. 428.370 Section 428.370 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 428.370 Government-owned vehicles operated in foreign countries....

  10. 48 CFR 970.5222-1 - Collective Bargaining Agreements Management and Operating Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Collective Bargaining Agreements Management and Operating Contracts. 970.5222-1 Section 970.5222-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses...

  11. Operations and maintenance manual for the LDUA supervisory control and data acquisition system (LDUA System 4200) and control network (LDUA System 4400)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, G.A.

    1998-03-11

    This document defines the requirements applicable to the operation, maintenance and storage of the Supervisory Control and Data Acquisition System (SCADAS) and Control Network in support of the Light Duty Utility Arm (LDUA) operations.

  12. 48 CFR 225.7704-1 - Applicability of trade agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Applicability of trade agreements. 225.7704-1 Section 225.7704-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Afghanistan 225.7704-1...

  13. 48 CFR 225.7704-1 - Applicability of trade agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Applicability of trade agreements. 225.7704-1 Section 225.7704-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Iraq or Afghanistan...

  14. 48 CFR 225.7704-1 - Applicability of trade agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Applicability of trade agreements. 225.7704-1 Section 225.7704-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Afghanistan 225.7704-1...

  15. A Conceptual Framework for Defense Acquisition Decision Makers: Giving the Schedule its Due

    DTIC Science & Technology

    2014-01-01

    Principles from microeconomic theory and operations research can provide insight into acquisition decisions to produce military capabili- ties in an...models based on economic and operations research principles can yield valuable insight into defense acquisition decisions. This article focuses on models...Department Edmund Conrow (1995) developed an excellent microeconomic framework to investigate the incentives of buyers and sellers in the defense

  16. Synthetic aperture radar operator tactical target acquisition research

    NASA Technical Reports Server (NTRS)

    Hershberger, M. L.; Craig, D. W.

    1978-01-01

    A radar target acquisition research study was conducted to access the effects of two levels of 13 radar sensor, display, and mission parameters on operator tactical target acquisition. A saturated fractional-factorial screening design was employed to examine these parameters. Data analysis computed ETA squared values for main and second-order effects for the variables tested. Ranking of the research parameters in terms of importance to system design revealed four variables (radar coverage, radar resolution/multiple looks, display resolution, and display size) accounted for 50 percent of the target acquisition probability variance.

  17. 76 FR 22746 - Conecuh Valley Railway, LLC-Acquisition and Operation Exemption-Conecuh Valley Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Railway, LLC--Acquisition and Operation Exemption--Conecuh Valley Railroad Co., Inc. Conecuh Valley Railway, LLC (CVR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Conecuh Valley Railroad Co., Inc. (COEH), and to operate [[Page 22747

  18. 76 FR 22746 - Wiregrass Central Railway, LLC-Acquisition and Operation Exemption-Wiregrass Central Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Railway, LLC--Acquisition and Operation Exemption--Wiregrass Central Railroad Company, Inc. Wiregrass Central Railway, LLC (WCR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Wiregrass Central Railroad Company, Inc. (WGCR), and to operate approximately 21.2 miles of...

  19. 76 FR 22745 - Three Notch Railway, LLC-Acquisition and Operation Exemption-Three Notch Railroad Co., Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Railway, LLC--Acquisition and Operation Exemption-- Three Notch Railroad Co., Inc. Three Notch Railway... from Three Notch Railroad Co., Inc. (TNHR) and to operate approximately 34 miles of rail line \\1... assigned TNHR's agreement with Andalusia & Conecuh Railroad Company, which was assigned to TNHR by the...

  20. 48 CFR 52.225-20 - Prohibition on Conducting Restricted Business Operations in Sudan-Certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Prohibition on Conducting Restricted Business Operations in Sudan-Certification. 52.225-20 Section 52.225-20 Federal Acquisition... Operations in Sudan—Certification. As prescribed at 25.1103(d), insert the following provision: Prohibition...

  1. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  2. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  3. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  4. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  5. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  6. 48 CFR 17.603 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 17.603 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.603 Limitations. (a) Management and operating contracts shall not be authorized for— (1) Functions involving the...

  7. 48 CFR 17.603 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 17.603 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.603 Limitations. (a) Management and operating contracts shall not be authorized for— (1) Functions involving the...

  8. Radiation-hardened fast acquisition/weak signal tracking system and method

    NASA Technical Reports Server (NTRS)

    Winternitz, Luke (Inventor); Boegner, Gregory J. (Inventor); Sirotzky, Steve (Inventor)

    2009-01-01

    A global positioning system (GPS) receiver and method of acquiring and tracking GPS signals comprises an antenna adapted to receive GPS signals; an analog radio frequency device operatively connected to the antenna and adapted to convert the GPS signals from an analog format to a digital format; a plurality of GPS signal tracking correlators operatively connected to the analog RF device; a GPS signal acquisition component operatively connected to the analog RF device and the plurality of GPS signal tracking correlators, wherein the GPS signal acquisition component is adapted to calculate a maximum vector on a databit correlation grid; and a microprocessor operatively connected to the plurality of GPS signal tracking correlators and the GPS signal acquisition component, wherein the microprocessor is adapted to compare the maximum vector with a predetermined correlation threshold to allow the GPS signal to be fully acquired and tracked.

  9. A Description of the Development, Capabilities, and Operational Status of the Test SLATE Data Acquisition System at the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Cramer, Christopher J.; Wright, James D.; Simmons, Scott A.; Bobbitt, Lynn E.; DeMoss, Joshua A.

    2015-01-01

    The paper will present a brief background of the previous data acquisition system at the National Transonic Facility (NTF) and the reasoning and goals behind the upgrade to the current Test SLATE (Test Software Laboratory and Automated Testing Environments) data acquisition system. The components, performance characteristics, and layout of the Test SLATE system within the NTF control room will be discussed. The development, testing, and integration of Test SLATE within NTF operations will be detailed. The operational capabilities of the system will be outlined including: test setup, instrumentation calibration, automatic test sequencer setup, data recording, communication between data and facility control systems, real time display monitoring, and data reduction. The current operational status of the Test SLATE system and its performance during recent NTF testing will be highlighted including high-speed, frame-by-frame data acquisition with conditional sampling post-processing applied. The paper concludes with current development work on the system including the capability for real-time conditional sampling during data acquisition and further efficiency enhancements to the wind tunnel testing process.

  10. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  11. 48 CFR 207.171-3 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 207.171-3 Policy. DoD policy is to... (through reduction in varieties of spare parts) and economies in operations and training (through...

  12. 48 CFR 8.801 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 8.801 Section 8.801 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING..., means supplies that are used and equipment that is usable in printing and binding operations. [48 FR...

  13. Improvements and modifications to the NASA microwave signature acquisition system

    NASA Technical Reports Server (NTRS)

    Jean, B. R.; Newton, R. W.; Warren, G. L.; Clark, B. V.; Zajicek, J. L.

    1978-01-01

    A user oriented description of the modified and upgraded Microwave Signature Acquisition System is provided. The present configuration of the sensor system and its operating characteristics are documented and a step-by-step operating procedure provides instruction for mounting the antenna truss assembly, readying the system for data acquisition, and for controlling the system during the data collection sequence. The resulting data products are also identified.

  14. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  15. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  16. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  17. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  18. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  19. 78 FR 802 - Heart of Texas Railroad, L.P.-Acquisition and Operation Exemption-Gulf Colorado & San Saba...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... Railroad, L.P.--Acquisition and Operation Exemption--Gulf Colorado & San Saba Railway Company Heart of Texas Railroad, L.P. (the Company), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Gulf Colorado & San Saba Railway Company (the Seller), and to operate...

  20. 77 FR 23806 - Manning Rail, Inc.-Acquisition and Operation Exemption-Manning Grain Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35607] Manning Rail, Inc.--Acquisition and Operation Exemption--Manning Grain Company Manning Rail, Inc. (MRI), a noncarrier, has filed a verified notice of exemption \\1\\ under 49 CFR 1150.31 to acquire from Manning Grain Company (MGC) and operate a 7.1-mile rail line...

  1. 77 FR 20882 - Manning Grain Company; Acquisition and Operation Exemption; Fillmore Western Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35612] Manning Grain Company; Acquisition and Operation Exemption; Fillmore Western Railway Company Manning Grain Company (MGC), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Fillmore Western Railway Company (FWRC) and operate a...

  2. 75 FR 68397 - DeQueen and Eastern Railroad, LLC-Acquisition and Operation Exemption-DeQueen and Eastern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Eastern Railroad, LLC--Acquisition and Operation Exemption--DeQueen and Eastern Railroad Company DeQueen and Eastern Railroad, LLC (DQE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from DeQueen and Eastern Railroad Company and to operate approximately 47 miles of...

  3. 78 FR 338 - Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35697] Buckeye Hammond Railroad, L.L.C.; Acquisition and Operation Exemption; Buckeye Partners, L.P. Buckeye Hammond Railroad, L.L... acquire from Buckeye Partners, L.P., a noncarrier, and to operate approximately 6,797 feet (1.29 miles) of...

  4. 48 CFR 970.1504-1-1 - Fees for management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fees for management and operating contracts. 970.1504-1-1 Section 970.1504-1-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-1 Fees for management and...

  5. A new algorithm for agile satellite-based acquisition operations

    NASA Astrophysics Data System (ADS)

    Bunkheila, Federico; Ortore, Emiliano; Circi, Christian

    2016-06-01

    Taking advantage of the high manoeuvrability and the accurate pointing of the so-called agile satellites, an algorithm which allows efficient management of the operations concerning optical acquisitions is described. Fundamentally, this algorithm can be subdivided into two parts: in the first one the algorithm operates a geometric classification of the areas of interest and a partitioning of these areas into stripes which develop along the optimal scan directions; in the second one it computes the succession of the time windows in which the acquisition operations of the areas of interest are feasible, taking into consideration the potential restrictions associated with these operations and with the geometric and stereoscopic constraints. The results and the performances of the proposed algorithm have been determined and discussed considering the case of the Periodic Sun-Synchronous Orbits.

  6. 33. Perimeter acquisition radar building room #320, perimeter acquisition radar ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Perimeter acquisition radar building room #320, perimeter acquisition radar operations center (PAROC), contains the tactical command and control group equipment required to control the par site. Showing spacetrack monitor console - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  7. Effects of mand-tact versus tact-only training on the acquisition of tacts.

    PubMed Central

    Arntzen, Erik; Almås, Inger Karin

    2002-01-01

    We sought to replicate and extend Carroll and Hesse's (1987) study of the acquisition of tacts by including participants with and without developmental disabilities. As in Carroll and Hesse, the present results showed that mand-tact training, rather than tact-only training, led to more rapid acquisition of tacts. Tacting on follow-up tests did not differ. In addition, our results show that mand-tact training established both verbal operants involved about as rapidly as tact-only training established only one verbal operant. DESCRIPTORS: verbal behavior, tact acquisition, mand-tact training, tact-only training, follow-up PMID:12555915

  8. Data acquisition system for operational earth observation missions

    NASA Technical Reports Server (NTRS)

    Deerwester, J. M.; Alexander, D.; Arno, R. D.; Edsinger, L. E.; Norman, S. M.; Sinclair, K. F.; Tindle, E. L.; Wood, R. D.

    1972-01-01

    The data acquisition system capabilities expected to be available in the 1980 time period as part of operational Earth observation missions are identified. By data acquisition system is meant the sensor platform (spacecraft or aircraft), the sensors themselves and the communication system. Future capabilities and support requirements are projected for the following sensors: film camera, return beam vidicon, multispectral scanner, infrared scanner, infrared radiometer, microwave scanner, microwave radiometer, coherent side-looking radar, and scatterometer.

  9. 48 CFR 970.0100 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope of part. 970.0100 Section 970.0100 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contract Regulatory System 970...

  10. Multiple acquisitions via sequential transfer of orphan spin polarization (MAeSTOSO): How far can we push residual spin polarization in solid-state NMR?

    NASA Astrophysics Data System (ADS)

    Gopinath, T.; Veglia, Gianluigi

    2016-06-01

    Conventional multidimensional magic angle spinning (MAS) solid-state NMR (ssNMR) experiments detect the signal arising from the decay of a single coherence transfer pathway (FID), resulting in one spectrum per acquisition time. Recently, we introduced two new strategies, namely DUMAS (DUal acquisition Magic Angle Spinning) and MEIOSIS (Multiple ExperIments via Orphan SpIn operatorS), that enable the simultaneous acquisitions of multidimensional ssNMR experiments using multiple coherence transfer pathways. Here, we combined the main elements of DUMAS and MEIOSIS to harness both orphan spin operators and residual polarization and increase the number of simultaneous acquisitions. We show that it is possible to acquire up to eight two-dimensional experiments using four acquisition periods per each scan. This new suite of pulse sequences, called MAeSTOSO for Multiple Acquisitions via Sequential Transfer of Orphan Spin pOlarization, relies on residual polarization of both 13C and 15N pathways and combines low- and high-sensitivity experiments into a single pulse sequence using one receiver and commercial ssNMR probes. The acquisition of multiple experiments does not affect the sensitivity of the main experiment; rather it recovers the lost coherences that are discarded, resulting in a significant gain in experimental time. Both merits and limitations of this approach are discussed.

  11. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  12. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  13. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  14. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  15. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  16. 25 CFR 151.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... operation of law, be held in restricted status following acquisition. Acquisition of land in trust status by... the United States in trust status for individual Indians and tribes. Acquisition of land by individual... land in trust status in the State of Alaska, except acquisitions for the Metlakatla Indian Community of...

  17. 32 CFR 700.326 - The Assistant Secretary of the Navy (Research, Development and Acquisition).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., development and acquisition, except for military requirements and operational test and evaluation; (b) Direct management of acquisition programs; (c) All aspects of the acquisition process within the Department of the..., procurement, competition, contracts and business management, logistics, product integrity, and education and...

  18. 77 FR 65446 - Turtle Creek Industrial Railroad, Inc.-Acquisition and Operation Exemption-Consolidated Rail...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35678] Turtle Creek Industrial Railroad, Inc.--Acquisition and Operation Exemption--Consolidated Rail Corporation Turtle Creek Industrial Railroad, Inc. (TCKR), a noncarrier and a wholly owned corporate subsidiary of Dura-Bond...

  19. 48 CFR 719.271 - Agency program direction and operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Agency program direction and operation. 719.271 Section 719.271 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271 Agency program direction and...

  20. 48 CFR 719.271 - Agency program direction and operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Agency program direction and operation. 719.271 Section 719.271 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271 Agency program direction and...

  1. Point-and-stare operation and high-speed image acquisition in real-time hyperspectral imaging

    NASA Astrophysics Data System (ADS)

    Driver, Richard D.; Bannon, David P.; Ciccone, Domenic; Hill, Sam L.

    2010-04-01

    The design and optical performance of a small-footprint, low-power, turnkey, Point-And-Stare hyperspectral analyzer, capable of fully automated field deployment in remote and harsh environments, is described. The unit is packaged for outdoor operation in an IP56 protected air-conditioned enclosure and includes a mechanically ruggedized fully reflective, aberration-corrected hyperspectral VNIR (400-1000 nm) spectrometer with a board-level detector optimized for point and stare operation, an on-board computer capable of full system data-acquisition and control, and a fully functioning internal hyperspectral calibration system for in-situ system spectral calibration and verification. Performance data on the unit under extremes of real-time survey operation and high spatial and high spectral resolution will be discussed. Hyperspectral acquisition including full parameter tracking is achieved by the addition of a fiber-optic based downwelling spectral channel for solar illumination tracking during hyperspectral acquisition and the use of other sensors for spatial and directional tracking to pinpoint view location. The system is mounted on a Pan-And-Tilt device, automatically controlled from the analyzer's on-board computer, making the HyperspecTM particularly adaptable for base security, border protection and remote deployments. A hyperspectral macro library has been developed to control hyperspectral image acquisition, system calibration and scene location control. The software allows the system to be operated in a fully automatic mode or under direct operator control through a GigE interface.

  2. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition...

  3. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  4. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  5. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  6. 48 CFR 970.2301 - Sustainable acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... 970.2301 Section 970.2301 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301 Sustainable acquisition. ...

  7. 48 CFR 3439.702 - Department security requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Department Requirements for Acquisition of Information Technology 3439.702 Department security requirements. The...) involves the design, operation, repair, or maintenance of information systems and access to sensitive but...

  8. 48 CFR 3439.702 - Department security requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Department Requirements for Acquisition of Information Technology 3439.702 Department security requirements. The...) involves the design, operation, repair, or maintenance of information systems and access to sensitive but...

  9. 48 CFR 3439.702 - Department security requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Department Requirements for Acquisition of Information Technology 3439.702 Department security requirements. The...) involves the design, operation, repair, or maintenance of information systems and access to sensitive but...

  10. On Board Data Acquisition System with Intelligent Transducers for Unmanned Aerial Vehicles

    NASA Astrophysics Data System (ADS)

    Rochala, Zdzisław

    2012-02-01

    This report presents conclusions from research project no. ON50900363 conducted at the Mechatronics Department, Military University of Technology in the years 2007-2010. As the main object of the study involved the preparation of a concept and the implementation of an avionics data acquisition system intended for research during flight of unmanned aerial vehicles of the mini class, this article presents a design of an avionics system and describes equipment solutions of a distributed measurement system intended for data acquisition consisting of intelligent transducers. The data collected during a flight controlled by an operator confirmed proper operation of the individual components of the data acquisition system.

  11. 77 FR 38884 - Sisseton Milbank Railroad Company-Acquisition and Operation Exemption-SLA Property Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35641] Sisseton Milbank Railroad Company--Acquisition and Operation Exemption--SLA Property Management Limited Partnership and... verified notice of exemption under 49 CFR 1150.31 to acquire from SLA Property Management Limited...

  12. CMMI (Trademark) for Acquisition, Version 1.2

    DTIC Science & Technology

    2007-11-01

    operational concept to derive more detailed and prec inclu even t . The level of detail of contractual requirements is based on the acquisition...product components ma suppliers. idate Requirem Requirements Ana t the intended operational environment will have on the ability to satisfy stakeholder...es. Considerations such the t . , constraints, and interfaces and (2) to translate these e SP 3.1 Establish Operational Concepts and Scenarios

  13. Canes Implementation: Analysis of Budgetary, Business, and Policy Challenges

    DTIC Science & Technology

    2014-12-01

    Concept of Operations COTS Commercial Off the Shelf DAG Defense Acquisitions Guidebook DAS Defense Acquisitions System DOD Department of Defense...and Integration NSS National Security Strategy OA Open Architecture OCO Overseas Contingency Operations OEF Operation Enduring Freedom OIF...and software and civilian-type open architecture ( OA ) presents a series of challenges. The purpose of this report is to provide the Navy with a

  14. 48 CFR 225.7702 - Acquisition of small arms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Acquisition of small arms... Operations in Iraq or Afghanistan 225.7702 Acquisition of small arms. (a) Except as provided in paragraph (b) of this section, when acquiring small arms for assistance to the Army of Iraq, the Army of...

  15. 48 CFR 225.7702-1 - Acquisition of small arms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Acquisition of small arms... Operations in Afghanistan 225.7702-1 Acquisition of small arms. (a) Except as provided in paragraph (b) of this section, when acquiring small arms for assistance to the Army of Afghanistan, the Afghani Police...

  16. 48 CFR 225.7702 - Acquisition of small arms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Acquisition of small arms... Operations in Iraq or Afghanistan 225.7702 Acquisition of small arms. (a) Except as provided in paragraph (b) of this section, when acquiring small arms for assistance to the Army of Iraq, the Army of...

  17. 48 CFR 225.7702-1 - Acquisition of small arms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Acquisition of small arms... Operations in Afghanistan 225.7702-1 Acquisition of small arms. (a) Except as provided in paragraph (b) of this section, when acquiring small arms for assistance to the Army of Afghanistan, the Afghani Police...

  18. 48 CFR 225.7702 - Acquisition of small arms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Acquisition of small arms... Operations in Iraq or Afghanistan 225.7702 Acquisition of small arms. (a) Except as provided in paragraph (b) of this section, when acquiring small arms for assistance to the Army of Iraq, the Army of...

  19. Report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment

    DTIC Science & Technology

    1991-06-06

    This is our final report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment (TAOC/MCE) for your...matters of concern that could affect the acquisition of the TAOC/MCE. We performed the audit from March through December 1990. The audit objective was...controls related to the audit objectives. The audit was made in accordance with the Inspector General’s critical program management element approach

  20. UH-60M Black Hawk Helicopter (UH-60M Black Hawk)

    DTIC Science & Technology

    2016-12-01

    Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-341 UH-60M Black Hawk Helicopter (UH-60M Black Hawk) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 21, 2016 18:25:45 UNCLASSIFIED UH-60M Black Hawk December 2015 SAR March 21, 2016 18...Operational Requirements Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost UH-60M Black Hawk

  1. Test Operations Procedure (TOP) 02-1-100 Anthropomorphic Test Device Operation and Setup

    DTIC Science & Technology

    2016-02-09

    using the Data Acquisition for Anthropomorphic Test Devices (D4D) in vehicle vulnerability testing. The D4D is an onboard data acquisition system ( DAS ...for Anthropomorphic Test Devices (D4D)** in vehicle vulnerability testing. The D4D is an onboard data acquisition system ( DAS ) that is intended for...use with the Hybrid II/III ATD’s. The D4D was developed to augment the existing DAS system, the legacy Versatile Information Systems Integrated On

  2. 77 FR 64185 - BNSF Railway Company-Acquisition and Operation Exemption-Nebraska Northeastern Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35644] BNSF Railway Company--Acquisition and Operation Exemption-- Nebraska Northeastern Railway Company AGENCY: Surface.... 10502 from the prior approval requirements of 49 U.S.C. 11323-25 for BNSF Railway Company (BNSF), a...

  3. 76 FR 50326 - Tyburn Railroad, LLC-Acquisition and Operation Exemption-Tyburn Railroad Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35541] Tyburn Railroad, LLC--Acquisition and Operation Exemption--Tyburn Railroad Company Tyburn Railroad, LLC (Tyburn), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Tyburn Railroad...

  4. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment for... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations...

  5. 77 FR 74548 - North Shore Railroad Company-Acquisition and Operation Exemption-PPL Susquehanna, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Railroad Company--Acquisition and Operation Exemption--PPL Susquehanna, LLC North Shore Railroad Company...., that PPL Susquehanna, LLC (PPLS), and Allegheny Electric Cooperative, Inc. (AEC), the owners of the... extends to an interchange with Norfolk Southern Railway. North Shore states that it provides the only...

  6. 76 FR 36883 - Defense Federal Acquisition Regulation Supplement; Synchronized Predeployment and Operational...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... Tracker (SPOT) (DFARS Case 2011-D030) AGENCY: Defense Acquisition Regulations System, Department of... requirements associated with the Synchronized Predeployment and Operational Tracker (SPOT) system. DATES... (SPOT)-generated letter of authorization.'' The change in title is being made at DFARS 225.7402-3(e) and...

  7. Navy Health Care Executive Competencies

    DTIC Science & Technology

    2006-04-04

    Understanding 10 Information 1 Familiarization with Civilian Health Care and Other Understanding Business 9 Government Systems I Understanding TRICARE 3...Operational Experience/Understanding 10* Acquisitions/Contracting I Understanding Business 9 Automated Health System Information I Understanding TRICARE...Operational Experience/Understanding 10* Acquisitions/Contracting Understanding Business 9 Automated Health System Information Understanding TRICARE 3

  8. 75 FR 1567 - Defense Federal Acquisition Regulation Supplement; Foreign Participation in Acquisitions in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... acquisition from the nine South Caucasus/Central and South Asian (SC/CASA) states; and Determination of..., ammunition, or war materials) from the SC/CASA states to support operations in Afghanistan. The end of the...

  9. Repeatability of diagnostic ultrasonography in the assessment of the equine superficial digital flexor tendon.

    PubMed

    Pickersgill, C H; Marr, C M; Reid, S W

    2001-01-01

    A quantitative investigation of the variation that can occur during the course of ultrasonography of the equine superficial digital flexor tendons (SDFT) was undertaken. The aim of this investigation was to use an objective measure, namely the measurement of CSA, to quantify the variability occurring during the course of the ultrasonographic assessment of the equine SDFT. The effects of 3 variables on the CSA measurements were determined. 1) Image acquisition operator (IAc): two different operators undertaking the ultrasonographic examination; 2) image analysis operator (IAn): two different operators undertaking the calculation of CSA values from previously stored images; and 3) analytical equipment (used during CSA measurement) (IEq): the use of 2 different sets of equipment during calculation of CSA values. Tendon cross-sectional area (CSA) measurements were used as the comparative variable of 3 potential sources: interoperator, during image acquisition; interoperator, during CSA measurement; and intraoperator, when using different analytical equipment. Two operators obtained transverse ultrasonographic images from the forelimb SDFTs of 16 National Hunt (NH) Thoroughbred (TB) racehorses, each undertaking analysis of their own and the other operator's images. One operator undertook analysis of their images using 2 sets of equipment. There was no statistically significant difference in the results obtained when different operators undertook image acquisition (P>0.05). At all but the most distal level, there was no significant difference when different equipment was used during analysis (P>0.05). A significant difference (P<0.01) was reported when different operators undertook image analysis, one operator consistently returning larger measurements. Different operators undertaking different stages of an examination can result in significant variability. To reduce confounding during ultrasonographic investigations involving multiple persons, one operator should undertake image analysis, although different operators may undertake image acquisition.

  10. Microcomputer control of infrared detector arrays used in direct imaging and in Fabry-Perot spectroscopy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossano, G.S.

    1989-02-01

    A microcomputer based data acquisition system has been developed for astronomical observing with two-dimensional infrared detector arrays operating at high pixel rates. The system is based on a 16-bit 8086/8087 microcomputer operating at 10 MHz. Data rates of up to 560,000 pixels/sec from arrays of up to 4096 elements are supported using the microcomputer system alone. A hardware co-adder the authors are developing permits data accumulation at rates of up to 1.67 million pixels/sec in both staring and chopped data acquisition modes. The system has been used for direct imaging and for data acquisition in a Fabry-Perot Spectrometer developed bymore » NRL. The hardware is operated using interactive software which supports the several available modes of data acquisition, and permits data display and reduction during observing sessions.« less

  11. How Much of Language Acquisition Does Operant Conditioning Explain?

    PubMed

    Sturdy, Christopher B; Nicoladis, Elena

    2017-01-01

    Since the 1950s, when Chomsky argued that Skinner's arguments could not explain syntactic acquisition, psychologists have generally avoided explicitly invoking operant or instrumental conditioning as a learning mechanism for language among human children. In this article, we argue that this is a mistake. We focus on research that has been done on language learning in human infants and toddlers in order to illustrate our points. Researchers have ended up inventing learning mechanisms that, in actual practice, not only resemble but also in fact are examples of operant conditioning (OC) by any other name they select. We argue that language acquisition researchers should proceed by first ruling out OC before invoking alternative learning mechanisms. While it is possible that OC cannot explain all of the language acquisition, simple learning mechanisms that work across species may have some explanatory power in children's language learning.

  12. How Much of Language Acquisition Does Operant Conditioning Explain?

    PubMed Central

    Sturdy, Christopher B.; Nicoladis, Elena

    2017-01-01

    Since the 1950s, when Chomsky argued that Skinner’s arguments could not explain syntactic acquisition, psychologists have generally avoided explicitly invoking operant or instrumental conditioning as a learning mechanism for language among human children. In this article, we argue that this is a mistake. We focus on research that has been done on language learning in human infants and toddlers in order to illustrate our points. Researchers have ended up inventing learning mechanisms that, in actual practice, not only resemble but also in fact are examples of operant conditioning (OC) by any other name they select. We argue that language acquisition researchers should proceed by first ruling out OC before invoking alternative learning mechanisms. While it is possible that OC cannot explain all of the language acquisition, simple learning mechanisms that work across species may have some explanatory power in children’s language learning. PMID:29163295

  13. 48 CFR 225.7704-3 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... American-Trade Agreements-Balance of Payments Program solicitation provisions and contract clauses... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Iraq or Afghanistan 225.7704-3 Solicitation provisions and contract...

  14. 48 CFR 17.602 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 17.602 Section 17.602 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.602 Policy. (a) Heads of...

  15. 48 CFR 23.1002 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Applicability. 23.1002 Section 23.1002 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC....1002 Applicability. The requirements of this subpart apply to facilities owned or operated by an agency...

  16. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  17. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  18. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  19. 48 CFR 23.705 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception applies...

  20. Identifying Governance Best Practices in Systems-of-Systems Acquisition

    DTIC Science & Technology

    2014-02-08

    Acquisition Governance ................................................ 28  Figure 3.  Harvest Hercules Airborne Weapons Kit System Components ...... 39 ...acquisition poses considerable challenges that the current Department of Defense (DoD) acquisition governance structure was not necessarily designed to...specify the warship it needed along with the design , construction, and outfitting of the ship. The Navy managed and performed production operations and

  1. Real-time data acquisition of commercial microwave link networks for hydrometeorological applications

    NASA Astrophysics Data System (ADS)

    Chwala, Christian; Keis, Felix; Kunstmann, Harald

    2016-03-01

    The usage of data from commercial microwave link (CML) networks for scientific purposes is becoming increasingly popular, in particular for rain rate estimation. However, data acquisition and availability is still a crucial problem and limits research possibilities. To overcome this issue, we have developed an open-source data acquisition system based on the Simple Network Management Protocol (SNMP). It is able to record transmitted and received signal levels of a large number of CMLs simultaneously with a temporal resolution of up to 1 s. We operate this system at Ericsson Germany, acquiring data from 450 CMLs with minutely real-time transfer to our database. Our data acquisition system is not limited to a particular CML hardware model or manufacturer, though. We demonstrate this by running the same system for CMLs of a different manufacturer, operated by an alpine ski resort in Germany. There, the data acquisition is running simultaneously for four CMLs with a temporal resolution of 1 s. We present an overview of our system, describe the details of the necessary SNMP requests and show results from its operational application.

  2. Real time data acquisition of commercial microwave link networks for hydrometeorological applications

    NASA Astrophysics Data System (ADS)

    Chwala, C.; Keis, F.; Kunstmann, H.

    2015-11-01

    The usage of data from commercial microwave link (CML) networks for scientific purposes is becoming increasingly popular, in particular for rain rate estimation. However, data acquisition and availability is still a crucial problem and limits research possibilities. To overcome this issue, we have developed an open source data acquisition system based on the Simple Network Management Protocol (SNMP). It is able to record transmitted- and received signal levels of a large number of CMLs simultaneously with a temporal resolution of up to one second. We operate this system at Ericsson Germany, acquiring data from 450 CMLs with minutely real time transfer to our data base. Our data acquisition system is not limited to a particular CML hardware model or manufacturer, though. We demonstrate this by running the same system for CMLs of a different manufacturer, operated by an alpine skiing resort in Germany. There, the data acquisition is running simultaneously for four CMLs with a temporal resolution of one second. We present an overview of our system, describe the details of the necessary SNMP requests and show results from its operational application.

  3. Generation of multiple analog pulses with different duty cycles within VME control system for ICRH Aditya system

    NASA Astrophysics Data System (ADS)

    Joshi, Ramesh; Singh, Manoj; Jadav, H. M.; Misra, Kishor; Kulkarni, S. V.; ICRH-RF Group

    2010-02-01

    Ion Cyclotron Resonance Heating (ICRH) is a promising heating method for a fusion device due to its localized power deposition profile, a direct ion heating at high density, and established technology for high RF power generation and transmission at low cost. Multiple analog pulse with different duty cycle in master of digital pulse for Data acquisition and Control system for steady state RF ICRH System(RF ICRH DAC) to be used for operating of RF Generator in Aditya to produce pre ionization and second analog pulse will produce heating. The control system software is based upon single digital pulse operation for RF source. It is planned to integrate multiple analog pulses with different duty cycle in master of digital pulse for Data acquisition and Control system for RF ICRH System(RF ICRH DAC) to be used for operating of RF Generator in Aditya tokamak. The task of RF ICRH DAC is to control and acquisition of all ICRH system operation with all control loop and acquisition for post analysis of data with java based tool. For pre ionization startup as well as heating experiments using multiple RF Power of different powers and duration. The experiment based upon the idea of using single RF generator to energize antenna inside the tokamak to radiate power twise, out of which first analog pulse will produce pre ionization and second analog pulse will produce heating. The whole system is based on standard client server technology using tcp/ip protocol. DAC Software is based on linux operating system for highly reliable, secure and stable system operation in failsafe manner. Client system is based on tcl/tk like toolkit for user interface with c/c++ like environment which is reliable programming languages widely used on stand alone system operation with server as vxWorks real time operating system like environment. The paper is focused on the Data acquisition and monitoring system software on Aditya RF ICRH System with analog pulses in slave mode with digital pulse in master mode for control acquisition and monitoring and interlocking.

  4. 77 FR 2127 - Birmingham Terminal Railway, L.L.C.-Acquisition and Operation Exemption-Birmingham Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... Terminal Railway, L.L.C.--Acquisition and Operation Exemption--Birmingham Southern Railroad Company Birmingham Terminal Railway, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49... Exemption--Birmingham Terminal Railway, L.L.C., wherein Watco Holdings, Inc., seeks Board approval to...

  5. 76 FR 56004 - Mannheim Armitage Railway, LLC-Acquisition and Operation Exemption-Certain Trackage Rights of J...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35540] Mannheim Armitage Railway, LLC--Acquisition and Operation Exemption--Certain Trackage Rights of J. Emil Anderson & Son, Inc... verified notice of exemption \\1\\ under 49 CFR 1150.31 to acquire from J. Emil Anderson & Son, Inc...

  6. Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.

  7. 77 FR 72906 - Chessie Logistics Co., LLC-Acquisition and Operation Exemption-J. Emil Anderson & Son, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35700] Chessie Logistics Co., LLC--Acquisition and Operation Exemption-- J. Emil Anderson & Son, Inc. Chessie Logistics Co..., including 431 feet of siding, in the city of Melrose Park, Cook County, Ill. (the Track). According to...

  8. 48 CFR 15.407-4 - Should-cost review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractor's existing work force, methods, materials, equipment, real property, operating systems, and... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Should-cost review. 15.407-4 Section 15.407-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING...

  9. 48 CFR 17.600 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope of subpart. 17.600 Section 17.600 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.600 Scope of...

  10. 48 CFR 17.600 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope of subpart. 17.600 Section 17.600 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.600 Scope of...

  11. 48 CFR 17.600 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope of subpart. 17.600 Section 17.600 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.600 Scope of...

  12. 48 CFR 17.600 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope of subpart. 17.600 Section 17.600 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.600 Scope of...

  13. 48 CFR 17.600 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope of subpart. 17.600 Section 17.600 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.600 Scope of...

  14. 48 CFR 15.407-4 - Should-cost review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor's existing work force, methods, materials, equipment, real property, operating systems, and... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Should-cost review. 15.407-4 Section 15.407-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING...

  15. 48 CFR 15.407-4 - Should-cost review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor's existing work force, methods, materials, equipment, real property, operating systems, and... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Should-cost review. 15.407-4 Section 15.407-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING...

  16. 48 CFR 15.407-4 - Should-cost review.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractor's existing work force, methods, materials, equipment, real property, operating systems, and... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Should-cost review. 15.407-4 Section 15.407-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING...

  17. 48 CFR 15.407-4 - Should-cost review.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractor's existing work force, methods, materials, equipment, real property, operating systems, and... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Should-cost review. 15.407-4 Section 15.407-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING...

  18. 48 CFR 23.705 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...

  19. 48 CFR 23.705 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...

  20. 48 CFR 23.705 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...

  1. 48 CFR 23.706 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 23.706 Section 23.706 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...

  2. 48 CFR 4.602 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false General. 4.602 Section 4.602 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE... nonprofit agencies operating under the Javits-Wagner-O'Day Act, are sharing in Federal contracts; (3) A...

  3. 48 CFR 25.301-1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scope. 25.301-1 Section 25.301-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... include stability operations such as— (1) Establishment or maintenance of a safe and secure environment...

  4. 48 CFR 25.301-1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scope. 25.301-1 Section 25.301-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... include stability operations such as— (1) Establishment or maintenance of a safe and secure environment...

  5. 48 CFR 25.301-1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scope. 25.301-1 Section 25.301-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... include stability operations such as— (1) Establishment or maintenance of a safe and secure environment...

  6. 48 CFR 25.301-1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope. 25.301-1 Section 25.301-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... include stability operations such as— (1) Establishment or maintenance of a safe and secure environment...

  7. 48 CFR 25.301-1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope. 25.301-1 Section 25.301-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... include stability operations such as— (1) Establishment or maintenance of a safe and secure environment...

  8. Sustaining Equipment and the Rapid Acquisition Process: The Forgotten Phase

    DTIC Science & Technology

    2012-02-24

    Operation of the Defense Acquisition System,” December 8, 2008. 7 Rasch , Robert. A, Jr. Lessons Learned from Rapid Acquisition: Better, Faster, Cheaper...Life Cycle Management Responsibilities,” Defense AR Journal, 17.2 (April 2010): 183. 37 Robert A. Rasch , Lessons Learned from Rapid Acquisition: Better...Accountability Office (GAO) Report, Subject: Rapid Acquisition of Mine Resistant Protected Vehicles, July 15, 2008, 4. 39 Ibid. 40 Ibid. 41 Robert A. Rasch

  9. Breaking Bad: Reforming Cyber Acquisition via Innovative Strategies

    DTIC Science & Technology

    2015-04-01

    effects. Just as a special operations tactician can work with any weapon he finds on the ground , the FIRE-based team will thrive by being able to... operation could be challenged on legal grounds , so this acquisition strategy would need to develop an adjoining legal strategy to permit its employment...for the Degree of MASTER OF OPERATIONAL ARTS AND SCIENCES Advisor: Wg Cdr Graem M. Corfield, RAF Maxwell Air Force Base, Alabama April 2015

  10. Synergistic Approach Integrating Joint Capabilities for USSOCOM Contingency Contracting: Construction Management Module

    DTIC Science & Technology

    2010-12-01

    59 a. The Joint Uniform Lessons Learned System (JULLS) .........59 b. Acquisition Community Connection (ACC) ..........................59 c...Report ACC Acquisition Community Connection ADDIE Analyze, Design, Develop, Implement, Evaluate AFFARS Air Force Federal Acquisition Regulation...Operations J4 Logistics J5 Plans J6 Communications J8 Programming and Comptroller J&A Justification and Approval JARB Joint Acquisition

  11. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  12. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  13. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  14. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  15. 48 CFR 31.205-34 - Recruitment costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Recruitment costs. 31.205-34 Section 31.205-34 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... secure and maintain an adequate labor force. (3) Costs of operating an aptitude and educational testing...

  16. 48 CFR 225.7402-1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Scope. 225.7402-1 Section 225.7402-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... subsection may include stability operations such as— (1) Establishment or maintenance of a safe and secure...

  17. 48 CFR 225.7402-1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Scope. 225.7402-1 Section 225.7402-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... subsection may include stability operations such as— (1) Establishment or maintenance of a safe and secure...

  18. 48 CFR 31.205-34 - Recruitment costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Recruitment costs. 31.205-34 Section 31.205-34 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... secure and maintain an adequate labor force. (3) Costs of operating an aptitude and educational testing...

  19. 48 CFR 31.205-34 - Recruitment costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Recruitment costs. 31.205-34 Section 31.205-34 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... secure and maintain an adequate labor force. (3) Costs of operating an aptitude and educational testing...

  20. 48 CFR 225.7402-1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Scope. 225.7402-1 Section 225.7402-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... subsection may include stability operations such as— (1) Establishment or maintenance of a safe and secure...

  1. 48 CFR 31.205-34 - Recruitment costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Recruitment costs. 31.205-34 Section 31.205-34 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... secure and maintain an adequate labor force. (3) Costs of operating an aptitude and educational testing...

  2. 48 CFR 225.7402-1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Scope. 225.7402-1 Section 225.7402-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... subsection may include stability operations such as— (1) Establishment or maintenance of a safe and secure...

  3. 48 CFR 225.7402-1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Scope. 225.7402-1 Section 225.7402-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... subsection may include stability operations such as— (1) Establishment or maintenance of a safe and secure...

  4. Low Computational Signal Acquisition for GNSS Receivers Using a Resampling Strategy and Variable Circular Correlation Time

    PubMed Central

    Zhang, Yeqing; Wang, Meiling; Li, Yafeng

    2018-01-01

    For the objective of essentially decreasing computational complexity and time consumption of signal acquisition, this paper explores a resampling strategy and variable circular correlation time strategy specific to broadband multi-frequency GNSS receivers. In broadband GNSS receivers, the resampling strategy is established to work on conventional acquisition algorithms by resampling the main lobe of received broadband signals with a much lower frequency. Variable circular correlation time is designed to adapt to different signal strength conditions and thereby increase the operation flexibility of GNSS signal acquisition. The acquisition threshold is defined as the ratio of the highest and second highest correlation results in the search space of carrier frequency and code phase. Moreover, computational complexity of signal acquisition is formulated by amounts of multiplication and summation operations in the acquisition process. Comparative experiments and performance analysis are conducted on four sets of real GPS L2C signals with different sampling frequencies. The results indicate that the resampling strategy can effectively decrease computation and time cost by nearly 90–94% with just slight loss of acquisition sensitivity. With circular correlation time varying from 10 ms to 20 ms, the time cost of signal acquisition has increased by about 2.7–5.6% per millisecond, with most satellites acquired successfully. PMID:29495301

  5. Low Computational Signal Acquisition for GNSS Receivers Using a Resampling Strategy and Variable Circular Correlation Time.

    PubMed

    Zhang, Yeqing; Wang, Meiling; Li, Yafeng

    2018-02-24

    For the objective of essentially decreasing computational complexity and time consumption of signal acquisition, this paper explores a resampling strategy and variable circular correlation time strategy specific to broadband multi-frequency GNSS receivers. In broadband GNSS receivers, the resampling strategy is established to work on conventional acquisition algorithms by resampling the main lobe of received broadband signals with a much lower frequency. Variable circular correlation time is designed to adapt to different signal strength conditions and thereby increase the operation flexibility of GNSS signal acquisition. The acquisition threshold is defined as the ratio of the highest and second highest correlation results in the search space of carrier frequency and code phase. Moreover, computational complexity of signal acquisition is formulated by amounts of multiplication and summation operations in the acquisition process. Comparative experiments and performance analysis are conducted on four sets of real GPS L2C signals with different sampling frequencies. The results indicate that the resampling strategy can effectively decrease computation and time cost by nearly 90-94% with just slight loss of acquisition sensitivity. With circular correlation time varying from 10 ms to 20 ms, the time cost of signal acquisition has increased by about 2.7-5.6% per millisecond, with most satellites acquired successfully.

  6. 76 FR 27173 - Carolina Coastal Railway, Inc.-Acquisition and Operation Exemption-Rocky Mount & Western Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... Railway, Inc.--Acquisition and Operation Exemption--Rocky Mount & Western Railroad Co., Inc. d/b/a Nash County Railroad Carolina Coastal Railway, Inc. (CLNA), a Class III rail carrier, has filed a verified notice of exemption under 49 CFR 1150.41 to acquire from Rocky Mount & Western Railroad Co., Inc. d/b/a...

  7. The Effect of Instruction on the Acquisition of Conservation of Volume.

    ERIC Educational Resources Information Center

    Butts, David P.; Howe, Ann C.

    Tested was the hypothesis that science instruction based on task analysis will lead to the acquisition of the ability to perform certain Piaget volume tasks which have been characterized as requiring formal operations for their solutions. A Test on Formal Operations and a Learning Hierarchies Test were given to fourth- and sixth-grade students in…

  8. 78 FR 25784 - Keenesburg Direct Railroad, LLC-Acquisition and Operation Exemption-J D East, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35735] Keenesburg Direct Railroad, LLC--Acquisition and Operation Exemption--J D East, LLC Keenesburg Direct Railroad, LLC (KDR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from J D East, LLC (JDE...

  9. 76 FR 11371 - Defense Federal Acquisition Regulation Supplement; Payments in Support of Emergencies and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Contingency Operations (DFARS Case 2009- D020) AGENCY: Defense Acquisition Regulations System, Department of... exemptions from the Prompt Payment Act. The interim rule exempted military payments related to contingencies.... 93-288, as amended (42 U.S.C. 5121, et seq.); contingency operations (as defined in 10 U.S.C. 101(a...

  10. 29. Perimeter acquisition radar building room #318, data processing system ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Perimeter acquisition radar building room #318, data processing system area; data processor maintenance and operations center, showing data processing consoles - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  11. 48 CFR 16.402-4 - Structuring multiple-incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Structuring multiple-incentive contracts. 16.402-4 Section 16.402-4 Federal Acquisition Regulations System FEDERAL ACQUISITION... include a cost incentive (or constraint) that operates to preclude rewarding a contractor for superior...

  12. Data acquisition channel apparatus

    NASA Astrophysics Data System (ADS)

    Higgins, C. H.; Skipper, J. D.

    1985-10-01

    Dicussed is a hybrid integrated circuit data acquisition channel apparatus employing an operational amplifier fed by a low current differential bipolar transistor preamplifier having separate feedback gain and signal gain determining elements and providing an amplified signal output to a sample and hold and analog-to-digital converter circuits. The disclosed apparatus operates with low energy and small space requirements and is capable of operations without the sample and hold circuit where the nature of the applied input signal permits.

  13. Development of a Naval Supply Systems Command Acquisition Supplement - A Business Practice Improvement

    DTIC Science & Technology

    2015-09-01

    The information reviewed for this project will help the reader understand how acquisition rules and regulations flow down to the acquisition...ACQUISITIONS IN SUPPORT OF OPERATIONS IN AFGHANISTAN Aug-09 N Obsolete 09-26 PASSIVE RADIO FREQUENCY IDENTIFICATION ( RFID ) DFARS COMPLIANCE REPORTING...been made. Many of the instructions and publications refer readers to additional instructions and publications, and often reference specific policy

  14. Orphan spin operators enable the acquisition of multiple 2D and 3D magic angle spinning solid-state NMR spectra

    NASA Astrophysics Data System (ADS)

    Gopinath, T.; Veglia, Gianluigi

    2013-05-01

    We propose a general method that enables the acquisition of multiple 2D and 3D solid-state NMR spectra for U-13C, 15N-labeled proteins. This method, called MEIOSIS (Multiple ExperIments via Orphan SpIn operatorS), makes it possible to detect four coherence transfer pathways simultaneously, utilizing orphan (i.e., neglected) spin operators of nuclear spin polarization generated during 15N-13C cross polarization (CP). In the MEIOSIS experiments, two phase-encoded free-induction decays are decoded into independent nuclear polarization pathways using Hadamard transformations. As a proof of principle, we show the acquisition of multiple 2D and 3D spectra of U-13C, 15N-labeled microcrystalline ubiquitin. Hadamard decoding of CP coherences into multiple independent spin operators is a new concept in solid-state NMR and is extendable to many other multidimensional experiments. The MEIOSIS method will increase the throughput of solid-state NMR techniques for microcrystalline proteins, membrane proteins, and protein fibrils.

  15. Orbital operations with the Shuttle Infrared Telescope Facility /SIRTF/

    NASA Technical Reports Server (NTRS)

    Werner, M. W.; Lorell, K. R.

    1981-01-01

    The Shuttle Infrared Telescope Facility (SIRTF) is a cryogenically-cooled, 1-m-class telescope that will be operated from the Space Shuttle as an observatory for infrared astronomy. This paper discusses the scientific constraints on and the requirements for pointing and controlling SIRTF as well as several aspects of SIRTF orbital operations. The basic pointing requirement is for an rms stability of 0.25 arcsec, which is necessary to realize the full angular resolution of the 5-micron diffraction-limited SIRTF. Achieving this stability requires the use of hardware and software integral to SIRTF working interactively with the gyrostabilized Shuttle pointing-mount. The higher sensitivity of SIRTF, together with orbital and time constraints, puts a premium on rapid target acquisition and on efficient operational and observational procedures. Several possible acquisition modes are discussed, and the importance of source acquisition by maximizing the output of an infrared detector is emphasized.

  16. ASRC Aerospace Corporation Selects Dynamically Reconfigurable Anadigm(Registered Trademark) FPAA For Advanced Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Mata, Carlos T.

    2003-01-01

    Anadigm(registered trademark) today announced that ASRC Aerospace Corporation has designed Anadigm's dynamically reconfigurable Field Programmable Analog Array (FPAA) technology into an advanced data acquisition system developed under contract for NASA. ASRC Aerospace designed in the Anadigm(registered trademark) FPAA to provide complex analog signal conditioning in its intelligent, self-calibrating, and self-healing advanced data acquisition system (ADAS). The ADAS has potential applications in industrial, manufacturing, and aerospace markets. This system offers highly reliable operation while reducing the need for user interaction. Anadigm(registered trademark)'s dynamically reconfigurable FPAAs can be reconfigured in-system by the designer or on the fly by a microprocessor. A single device can thus be programmed to implement multiple analog functions and/or to adapt on-the-fly to maintain precision operation despite system degradation and aging. In the case of the ASRC advanced data acquisition system, the FPAA helps ensure that the system will continue to operating at 100% functionality despite changes in the environment, component degradation, and/or component failures.

  17. Increasingly automated procedure acquisition in dynamic systems

    NASA Technical Reports Server (NTRS)

    Mathe, Nathalie; Kedar, Smadar

    1992-01-01

    Procedures are widely used by operators for controlling complex dynamic systems. Currently, most development of such procedures is done manually, consuming a large amount of paper, time, and manpower in the process. While automated knowledge acquisition is an active field of research, not much attention has been paid to the problem of computer-assisted acquisition and refinement of complex procedures for dynamic systems. The Procedure Acquisition for Reactive Control Assistant (PARC), which is designed to assist users in more systematically and automatically encoding and refining complex procedures. PARC is able to elicit knowledge interactively from the user during operation of the dynamic system. We categorize procedure refinement into two stages: diagnosis - diagnose the failure and choose a repair - and repair - plan and perform the repair. The basic approach taken in PARC is to assist the user in all steps of this process by providing increased levels of assistance with layered tools. We illustrate the operation of PARC in refining procedures for the control of a robot arm.

  18. Information management system breadboard data acquisition and control system.

    NASA Technical Reports Server (NTRS)

    Mallary, W. E.

    1972-01-01

    Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

  19. Motofit - integrating neutron reflectometry acquisition, reduction and analysis into one, easy to use, package

    NASA Astrophysics Data System (ADS)

    Nelson, Andrew

    2010-11-01

    The efficient use of complex neutron scattering instruments is often hindered by the complex nature of their operating software. This complexity exists at each experimental step: data acquisition, reduction and analysis, with each step being as important as the previous. For example, whilst command line interfaces are powerful at automated acquisition they often reduce accessibility by novice users and sometimes reduce the efficiency for advanced users. One solution to this is the development of a graphical user interface which allows the user to operate the instrument by a simple and intuitive "push button" approach. This approach was taken by the Motofit software package for analysis of multiple contrast reflectometry data. Here we describe the extension of this package to cover the data acquisition and reduction steps for the Platypus time-of-flight neutron reflectometer. Consequently, the complete operation of an instrument is integrated into a single, easy to use, program, leading to efficient instrument usage.

  20. Language Acquisitional Universals: L1, L2, Pidgins, and FLT.

    ERIC Educational Resources Information Center

    Wode, Henning

    Human capacity for language acquisition is not strictly compartmentalized, with one acquisitional mechanism for the native language and others totally unrelated to it; rather, it consists of a unified mechanism flexible enough to handle various differences in external settings. This learning system operates on the formal properties of the…

  1. Autonomous Sample Acquisition for Planetary and Small Body Explorations

    NASA Technical Reports Server (NTRS)

    Ghavimi, Ali R.; Serricchio, Frederick; Dolgin, Ben; Hadaegh, Fred Y.

    2000-01-01

    Robotic drilling and autonomous sample acquisition are considered as the key technology requirements in future planetary or small body exploration missions. Core sampling or subsurface drilling operation is envisioned to be off rovers or landers. These supporting platforms are inherently flexible, light, and can withstand only limited amount of reaction forces and torques. This, together with unknown properties of sampled materials, makes the sampling operation a tedious task and quite challenging. This paper highlights the recent advancements in the sample acquisition control system design and development for the in situ scientific exploration of planetary and small interplanetary missions.

  2. Autonomous Flight Rules Concept: User Implementation Costs and Strategies

    NASA Technical Reports Server (NTRS)

    Cotton, William B.; Hilb, Robert

    2014-01-01

    The costs to implement Autonomous Flight Rules (AFR) were examined for estimates in acquisition, installation, training and operations. The user categories were airlines, fractional operators, general aviation and unmanned aircraft systems. Transition strategies to minimize costs while maximizing operational benefits were also analyzed. The primary cost category was found to be the avionics acquisition. Cost ranges for AFR equipment were given to reflect the uncertainty of the certification level for the equipment and the extent of existing compatible avionics in the aircraft to be modified.

  3. Auto-Routable, Configurable, Daisy Chainable Data Acquisition System

    NASA Technical Reports Server (NTRS)

    Shuler, Robert L. (Inventor)

    2005-01-01

    A method and apparatus for an acquisition system includes a plurality of sensor input signal lines. At least one of the plurality of sensor input signal lines operatively connects to at least one of a plurality of amplifier circuits. At least one of the plurality of amplifier circuits operatively connects to at least one of a plurality of filter circuits.

  4. Air Force Handbook. 109th Congress

    DTIC Science & Technology

    2009-01-01

    FY06 Combat Survivor Evader Locator (CSEL) Acquisition Status Capabilities/Profile Functions /Performance Parameters 38 • Air Force’s primary source for...Broadcast Service (GBS) Capabilities/Profile Acquisition Status Functions /Performance Parameters • Purchase Requirements (Phase 2): • 3 primary ...Operations (AF CONOPS) that support the CSAF and joint vision of combat operations. • AF CONOPS describe key Air Force mission and/or functional areas

  5. SpaceOps 1992: Proceedings of the Second International Symposium on Ground Data Systems for Space Mission Operations

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Second International Symposium featured 135 oral presentations in these 12 categories: Future Missions and Operations; System-Level Architectures; Mission-Specific Systems; Mission and Science Planning and Sequencing; Mission Control; Operations Automation and Emerging Technologies; Data Acquisition; Navigation; Operations Support Services; Engineering Data Analysis of Space Vehicle and Ground Systems; Telemetry Processing, Mission Data Management, and Data Archiving; and Operations Management. Topics focused on improvements in the productivity, effectiveness, efficiency, and quality of mission operations, ground systems, and data acquisition. Also emphasized were accomplishments in management of human factors; use of information systems to improve data retrieval, reporting, and archiving; design and implementation of logistics support for mission operations; and the use of telescience and teleoperations.

  6. Stand-alone digital data storage control system including user control interface

    NASA Technical Reports Server (NTRS)

    Wright, Kenneth D. (Inventor); Gray, David L. (Inventor)

    1994-01-01

    A storage control system includes an apparatus and method for user control of a storage interface to operate a storage medium to store data obtained by a real-time data acquisition system. Digital data received in serial format from the data acquisition system is first converted to a parallel format and then provided to the storage interface. The operation of the storage interface is controlled in accordance with instructions based on user control input from a user. Also, a user status output is displayed in accordance with storage data obtained from the storage interface. By allowing the user to control and monitor the operation of the storage interface, a stand-alone, user-controllable data storage system is provided for storing the digital data obtained by a real-time data acquisition system.

  7. 48 CFR 211.002 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 211.002 Policy. All defense technology and... System, and DoDI 5000.2, Operation of the Defense Acquisition System. [71 FR 27641, May 12, 2006] ...

  8. Real-time UNIX in HEP data acquisition

    NASA Astrophysics Data System (ADS)

    Buono, S.; Gaponenko, I.; Jones, R.; Mapelli, L.; Mornacchi, G.; Prigent, D.; Sanchez-Corral, E.; Skiadelli, M.; Toppers, A.; Duval, P. Y.; Ferrato, D.; Le Van Suu, A.; Qian, Z.; Rondot, C.; Ambrosini, G.; Fumagalli, G.; Aguer, M.; Huet, M.

    1994-12-01

    Today's experimentation in high energy physics is characterized by an increasing need for sensitivity to rare phenomena and complex physics signatures, which require the use of huge and sophisticated detectors and consequently a high performance readout and data acquisition. Multi-level triggering, hierarchical data collection and an always increasing amount of processing power, distributed throughout the data acquisition layers, will impose a number of features on the software environment, especially the need for a high level of standardization. Real-time UNIX seems, today, the best solution for the platform independence, operating system interface standards and real-time features necessary for data acquisition in HEP experiments. We present the results of the evaluation, in a realistic application environment, of a Real-Time UNIX operating system: the EP/LX real-time UNIX system.

  9. Second Language Acquisition Research and the Study of Non-Native Varieties of English: Some Issues in Common.

    ERIC Educational Resources Information Center

    Ritchie, William C.

    1986-01-01

    Proposes that the study of basilectal and acrolectal Singapore English can contribute to a better understanding of second language acquisition and use, emphasizing the operation of the monitor and specifications of the hierarchy of difficulty in the acquisition of syntactic structures. (Author/CB)

  10. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  11. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  12. 77 FR 76938 - Defense Federal Acquisition Regulation Supplement: Contracting Activity Updates (DFARS Case 2012...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 202 RIN 0750-AH81 Defense...: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is... has either a significant effect beyond the internal operating procedures of the agency issuing the...

  13. 15. Front security entrance to the perimeter acquisition radar building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Front security entrance to the perimeter acquisition radar building, showing rotogates 1 and 2 and entrance door to security operations control center (SOCC), room #108 - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  14. 12 CFR 7.2020 - Acquisition and holding of shares as treasury stock.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 1 2011-01-01 2011-01-01 false Acquisition and holding of shares as treasury stock. 7.2020 Section 7.2020 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Corporate Practices § 7.2020 Acquisition and holding of shares as...

  15. 12 CFR 7.2020 - Acquisition and holding of shares as treasury stock.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Acquisition and holding of shares as treasury stock. 7.2020 Section 7.2020 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Corporate Practices § 7.2020 Acquisition and holding of shares as...

  16. 12 CFR 7.2020 - Acquisition and holding of shares as treasury stock.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Acquisition and holding of shares as treasury stock. 7.2020 Section 7.2020 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Corporate Practices § 7.2020 Acquisition and holding of shares as...

  17. 12 CFR 7.2020 - Acquisition and holding of shares as treasury stock.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Acquisition and holding of shares as treasury stock. 7.2020 Section 7.2020 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Corporate Practices § 7.2020 Acquisition and holding of shares as...

  18. 77 FR 58996 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change; Extension of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... AGENCY: Federal Acquisition Service (FAS), General Services Administration (GSA). ACTION: Notice with a...), Federal Acquisition Service (FAS) issued a notice on July 23, 2012. The comment period is extended to... Administration (GSA), Federal Acquisition Service (FAS) published a notice in the Federal Register at 77 FR 43084...

  19. Department of Homeland Security: Assessments of Selected Complex Acquisitions

    DTIC Science & Technology

    2010-06-01

    10 The two nonmajor programs selected—the Biosurveillance Common...Management Directive AD 102-01, and approves acquisitions to proceed to their next acquisition life- cycle phases upon satisfaction of applicable ...programs are Biosurveillance Common Operating Network and the Integrated Public Alert and Warning System. BioWatch Generation-3 had not started

  20. 31 CFR 30.14 - Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or reorganization? 30.14 Section 30.14 Money and Finance: Treasury Office of the Secretary of the Treasury TARP STANDARDS FOR COMPENSATION AND CORPORATE...

  1. The Interplanetary Pioneers. Volume 3: Operations

    NASA Technical Reports Server (NTRS)

    Corliss, W. R.

    1972-01-01

    The operational aspects of the Pioneer program are described. The phases of the program discussed include: prelaunch operations, launch to DSS acquisition, near-earth operations, nominal and extended cruise, and scientific results.

  2. DORCA II: Dynamic operations requirements and cost analysis program

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Program is written to handle logistics of acquisition and transport of personnel, equipment, and services and to determine costs, transport schedules, acquisition schedules, and fuel requirements of cargo transport.

  3. ScanImage: flexible software for operating laser scanning microscopes.

    PubMed

    Pologruto, Thomas A; Sabatini, Bernardo L; Svoboda, Karel

    2003-05-17

    Laser scanning microscopy is a powerful tool for analyzing the structure and function of biological specimens. Although numerous commercial laser scanning microscopes exist, some of the more interesting and challenging applications demand custom design. A major impediment to custom design is the difficulty of building custom data acquisition hardware and writing the complex software required to run the laser scanning microscope. We describe a simple, software-based approach to operating a laser scanning microscope without the need for custom data acquisition hardware. Data acquisition and control of laser scanning are achieved through standard data acquisition boards. The entire burden of signal integration and image processing is placed on the CPU of the computer. We quantitate the effectiveness of our data acquisition and signal conditioning algorithm under a variety of conditions. We implement our approach in an open source software package (ScanImage) and describe its functionality. We present ScanImage, software to run a flexible laser scanning microscope that allows easy custom design.

  4. Parametric Variation in Acquisition and Diachronic Change: A Response to the Commentaries

    ERIC Educational Resources Information Center

    Meisel, Jurgen M.

    2011-01-01

    The starting hypothesis of the keynote article (KA) is that language acquisition plays an essential role in processes leading to grammatical change. Consequently, a minimal requirement, to be met by explanations of diachronic change is that they rely on mechanisms which are operative in acquisition. The KA is therefore an appeal for…

  5. Untangling Locality and Orientation Constraints in the L2 Acquisition of Anaphoric Binding: A Feature-Based Approach

    ERIC Educational Resources Information Center

    Dominguez, Laura; Hicks, Glyn; Song, Hee-Jeong

    2012-01-01

    This study offers a Minimalist analysis of the L2 acquisition of binding properties whereby cross-linguistic differences arise from the interaction of anaphoric feature specifications and operations of the computational system (Reuland 2001, 2011; Hicks 2009). This analysis attributes difficulties in the L2 acquisition of locality and orientation…

  6. Satellite land use acquisition and applications to hydrologic planning models

    NASA Technical Reports Server (NTRS)

    Algazi, V. R.; Suk, M.

    1977-01-01

    A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.

  7. Associations of emotional arousal, dissociation and symptom severity with operant conditioning in borderline personality disorder.

    PubMed

    Paret, Christian; Hoesterey, Steffen; Kleindienst, Nikolaus; Schmahl, Christian

    2016-10-30

    Those with borderline personality disorder (BPD) display altered evaluations regarding reward and punishment compared to others. The processing of rewards is basal for operant conditioning. However, studies addressing operant conditioning in BPD patients are rare. In the current study, an operant conditioning task combining learning acquisition and reversal was used. BPD patients and matched healthy controls (HCs) were exposed to aversive and neutral stimuli to assess the influence of emotion on learning. Picture content, dissociation, aversive tension and symptom severity were rated. Error rates were measured. Results showed no group interactions between aversive versus neutral scenes. The higher emotional arousal, dissociation and tension, the worse the acquisition, but not reversal, scores were for BPD patients. Scores from the Borderline Symptom List were associated with more errors in the reversal, but not the acquisition phase. The results are preliminary evidence for impaired acquisition learning due to increased emotional arousal, dissociation and tension in BPD patients. A failure to process punishment in the reversal phase was associated with symptom severity and may be related to neuropsychological dysfunctioning involving the ventromedial prefrontal cortex. Conclusions are limited due to the correlational study design and the small sample size. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  8. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  9. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  10. Operational Use of Remote Sensing within USDA

    NASA Technical Reports Server (NTRS)

    Bethel, Glenn R.

    2007-01-01

    A viewgraph presentation of remote sensing imagery within the USDA is shown. USDA Aerial Photography, Digital Sensors, Hurricane imagery, Remote Sensing Sources, Satellites used by Foreign Agricultural Service, Landsat Acquisitions, and Aerial Acquisitions are also shown.

  11. 40 CFR 35.940-3 - Costs allowable, if approved.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of compost residues which result from wastewater treatment, if EPA has approved a program for use of the compost. (d) Acquisition of an operable portion of a treatment works. This type of acquisition is...

  12. 40 CFR 35.940-3 - Costs allowable, if approved.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of compost residues which result from wastewater treatment, if EPA has approved a program for use of the compost. (d) Acquisition of an operable portion of a treatment works. This type of acquisition is...

  13. Acquisition Strategy Guide,

    DTIC Science & Technology

    1984-07-01

    acquisition stategy for his program. Well informed, educated, and innovative applications and judgments are necessary to structure a successful...program but part of’the Con- operating forces. gress is opposed to it. A case in point is thle MIX missile development. In other instances the Ad...hierarchical format, can be applied to help in The market factors element includes both industrial organizing and structuring an acquisition strategy

  14. The Making of a Government LSI - From Warfare Capability to Operational System

    DTIC Science & Technology

    2015-04-30

    continues to evolve and implement Lead System Integrator (LSI) acquisition strategies, they have started to define numerous program initiatives that...employ more integrated engineering and management processes and techniques. These initiatives are developing varying acquisition approaches that define (1...government LSI transformation. Navy Systems Commands have begun adding a higher level of integration into their acquisition process with the

  15. Acquisition Review Quarterly (ARQ) Vol. 6, No.4

    DTIC Science & Technology

    1999-01-01

    collection of information, including suggestions for reducing this burden, to Washington Headquarters Services , Directorate for Information Operations...acquisition pro- services throughout the acquisition com- fessionals from the Department of Defense, munity. The views expressed were those federal...sums of money services than any other organization in the coupled with the declining budget high- world, with 8.7 million contracts worth light the

  16. TDRSS telecommunications system, PN code analysis

    NASA Technical Reports Server (NTRS)

    Dixon, R.; Gold, R.; Kaiser, F.

    1976-01-01

    The pseudo noise (PN) codes required to support the TDRSS telecommunications services are analyzed and the impact of alternate coding techniques on the user transponder equipment, the TDRSS equipment, and all factors that contribute to the acquisition and performance of these telecommunication services is assessed. Possible alternatives to the currently proposed hybrid FH/direct sequence acquisition procedures are considered and compared relative to acquisition time, implementation complexity, operational reliability, and cost. The hybrid FH/direct sequence technique is analyzed and rejected in favor of a recommended approach which minimizes acquisition time and user transponder complexity while maximizing probability of acquisition and overall link reliability.

  17. The Impact of Maintenance Free Operating Period Approach to Acquisition Approaches, System Sustainment, and Costs

    DTIC Science & Technology

    2013-01-07

    of MFOP principles on processes, procedures , and costs in acquisition planning. It investigates MFOP and reviews the results of a 2005 submarine pilot...approach be a game changer? This paper evaluates the potential impact of MFOP principles on processes, procedures , and costs in acquisition planning. It...elli=lc=_rpfkbpp=C=mr_if`=mlif`v= = - 2 - k^s^i=mlpqdo^ar^qb=p`elli= procedures , and costs in acquisition planning. The scope of the research was to

  18. Defense Acquisition Workforce: Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services

    DTIC Science & Technology

    2011-09-01

    suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway...maintenance or operations support for a missile range to grass cutting, and many things in between. According to the Defense Science Board, buying...may be found on the last Belva M. Martin page of this report. Staff acknowledgements are listed in appendix VII. t Director, Acquisition and

  19. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Developments in programs in telecommunication and data acquisition in space communications, radio navigation, radio science, and ground based radio astronomy are reported. Activities of the deep space network (DSN) and its associated ground communication facility (GCF) in planning, supporting research and technology, implementation, and in operations are outlined. The publication of reports on the application of radio interferometry at microwave frequencies for geodynamic measurements are presented. Implementation and operation for searching the microwave spectrum is reported.

  20. 31 CFR 30.14 - Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Q-14: How does section 111 of EESA... GOVERNANCE § 30.14 Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or... the aggregate, as the TARP recipient under the definition of “TARP recipient” in § 30.1 (Q-1). ...

  1. 31 CFR 30.14 - Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Q-14: How does section 111 of EESA... GOVERNANCE § 30.14 Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or... the aggregate, as the TARP recipient under the definition of “TARP recipient” in § 30.1 (Q-1). ...

  2. 31 CFR 30.14 - Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Q-14: How does section 111 of EESA... GOVERNANCE § 30.14 Q-14: How does section 111 of EESA operate in connection with an acquisition, merger, or... the aggregate, as the TARP recipient under the definition of “TARP recipient” in § 30.1 (Q-1). ...

  3. Predator Acquisition Program Transition from Rapid to Standard Processes

    DTIC Science & Technology

    2012-06-08

    47 Team Composition ...programs. Literature Review There is significant material written about Predator’s operational and acquisition success. For example, Dr. Mike...Reconnaissance Office (DARO), the organization that demonstrated medium altitude *The terms UAV and

  4. 48 CFR 17.601 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 17.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.601 Definition. Management..., maintenance, or support, on its behalf, of a Government-owned or -controlled research, development, special...

  5. 48 CFR 970.2671 - Diversity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Diversity. 970.2671 Section 970.2671 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Other Socioeconomic Programs 970.2671 Diversity. ...

  6. Multi-view Decision Making (MVDM) Workshop

    DTIC Science & Technology

    2009-02-01

    reflect the realities of system-of-systems development, acquisition, fielding and support: multi-view decision making (MVDM). MVDM addresses the...including mission risk, interoperable acquisition, and operational security and survivability. Hence, a multi-view approach to decision making is

  7. 48 CFR 970.4302 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Changes. 970.4302 Section 970.4302 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Modifications 970.4302 Changes. ...

  8. 48 CFR 42.601 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT... more than one operational location (e.g., division, plant, or subsidiary) often have corporate-wide... officer (CACO) to deal with corporate management and to perform selected contract administration functions...

  9. Data acquisition and control system with a programmable logic controller (PLC) for a pulsed chemical oxygen-iodine laser

    NASA Astrophysics Data System (ADS)

    Yu, Haijun; Li, Guofu; Duo, Liping; Jin, Yuqi; Wang, Jian; Sang, Fengting; Kang, Yuanfu; Li, Liucheng; Wang, Yuanhu; Tang, Shukai; Yu, Hongliang

    2015-02-01

    A user-friendly data acquisition and control system (DACS) for a pulsed chemical oxygen -iodine laser (PCOIL) has been developed. It is implemented by an industrial control computer,a PLC, and a distributed input/output (I/O) module, as well as the valve and transmitter. The system is capable of handling 200 analogue/digital channels for performing various operations such as on-line acquisition, display, safety measures and control of various valves. These operations are controlled either by control switches configured on a PC while not running or by a pre-determined sequence or timings during the run. The system is capable of real-time acquisition and on-line estimation of important diagnostic parameters for optimization of a PCOIL. The DACS system has been programmed using software programmable logic controller (PLC). Using this DACS, more than 200 runs were given performed successfully.

  10. Development and application of General Purpose Data Acquisition Shell (GPDAS) at advanced photon source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chung, Youngjoo; Kim, Keeman.

    1991-01-01

    An operating system shell GPDAS (General Purpose Data Acquisition Shell) on MS-DOS-based microcomputers has been developed to provide flexibility in data acquisition and device control for magnet measurements at the Advanced Photon Source. GPDAS is both a command interpreter and an integrated script-based programming environment. It also incorporates the MS-DOS shell to make use of the existing utility programs for file manipulation and data analysis. Features include: alias definition, virtual memory, windows, graphics, data and procedure backup, background operation, script programming language, and script level debugging. Data acquisition system devices can be controlled through IEEE488 board, multifunction I/O board, digitalmore » I/O board and Gespac crate via Euro G-64 bus. GPDAS is now being used for diagnostics R D and accelerator physics studies as well as for magnet measurements. Their hardware configurations will also be discussed. 3 refs., 3 figs.« less

  11. The history of imitation in learning theory: the language acquisition process.

    PubMed Central

    Kymissis, E; Poulson, C L

    1990-01-01

    The concept of imitation has undergone different analyses in the hands of different learning theorists throughout the history of psychology. From Thorndike's connectionism to Pavlov's classical conditioning, Hull's monistic theory, Mowrer's two-factor theory, and Skinner's operant theory, there have been several divergent accounts of the conditions that produce imitation and the conditions under which imitation itself may facilitate language acquisition. In tracing the roots of the concept of imitation in the history of learning theory, the authors conclude that generalized imitation, as defined and analyzed by operant learning theorists, is a sufficiently robust formulation of learned imitation to facilitate a behavior-analytic account of first-language acquisition. PMID:2230633

  12. Energy Keepers Incorporated, U.S. Department of Energy Tribal Energy Program Award #DE-EE0005040 Final Report December 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillin, Charmel; Lipscomb, Brian

    This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering;more » essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved:   • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.« less

  13. Development and application of a model for the analysis of trades between space launch system operations and acquisition costs

    NASA Astrophysics Data System (ADS)

    Nix, Michael B.

    2005-12-01

    Early design decisions in the development of space launch systems determine the costs to acquire and operate launch systems. Some sources indicate that as much as 90% of life cycle costs are fixed by the end of the critical design review phase. System characteristics determined by these early decisions are major factors in the acquisition cost of flight hardware elements and facilities and influence operations costs through the amount of maintenance and support labor required to sustain system function. Operations costs are also dependent on post-development management decisions regarding how much labor will be deployed to meet requirements of market demand and ownership profit. The ability to perform early trade-offs between these costs is vital to the development of systems that have the necessary capacity to provide service and are profitable to operate. An Excel-based prototype model was developed for making early analyses of trade-offs between the costs to operate a space launch system and to acquire the necessary assets to meet a given set of operational requirements. The model, integrating input from existing models and adding missing capability, allows the user to make such trade-offs across a range of operations concepts (required flight rates, staffing levels, shifts per workday, workdays per week and per year, unreliability, wearout and depot maintenance) and the number, type and capability of assets (flight hardware elements, processing and supporting facilities and infrastructure). The costs and capabilities of hypothetical launch systems can be modeled as a function of interrelated turnaround times and labor resource levels, and asset loss and retirement. The number of flight components and facilities required can be calculated and the operations and acquisition costs compared for a specified scenario. Findings, based on the analysis of a hypothetical two stage to orbit, reusable, unmanned launch system, indicate that the model is suitable for the trade-off analyses desired. The minimum turnaround time/maximum labor allocation for specific hardware configurations and characteristics and corresponding asset requirements can be estimated. Either turnaround time or resources can be varied and the resulting operations and acquisition costs can be compared. Asset reliability, wearout and depot maintenance intervals and durations can be varied as well to analyze the effects on costs. Likewise, the effects on operations and acquisitions costs of the introduction of alternative technologies that affect reliability, maintainability and supportability in various hardware configurations can be evaluated.

  14. A microcomputer based data acquisition system and experiment controller

    NASA Technical Reports Server (NTRS)

    Ganz, M. W.

    1981-01-01

    A data acquisition system is described. The system monitors and records the signal strength of a radio beacon sent to Earth from a geosynchronous satellite. It acquires data from several devices such as a radar, a radiometer, and a rain gauge which monitor the meteorological conditions along the Earth space propagation path. The acquired data are stored in digital format on magnetic tape for analysis at the computer center. A detailed description of the design and operation of the system's various hardware components is given. Schematic diagrams, the theory of operation, and normal operating procedures are presented.

  15. Performance, operational limits, of an Electronic Switching Spherical Array (ESSA) antenna

    NASA Technical Reports Server (NTRS)

    Stockton, R.

    1979-01-01

    The development of a microprocessor controller which provides multimode operational capability for the Electronic Switching Spherical Array (ESSA) Antenna is described. The best set of operating conditions were determined and the performance of an ESSA antenna was demonstrated in the following modes: (1) omni; (2) acquisition/track; (3) directive; and (4) multibeam. The control algorithms, software flow diagrams, and electronic circuitry were developed. The microprocessor and control electronics were built and interfaced with the antenna to carry out performance testing. The acquisition/track mode for users in the Tracking and Data Relay Satellite System is emphasized.

  16. Acquisition Modernization: Transitioning Technology Into Warfighter Capability

    DTIC Science & Technology

    2011-08-01

    to test and evaluate the technology and integrate the new capability into operational weapon systems (Figure 4). This funding model creates stove...misalignment between missions, TRLs, and the RDT&E funding model is a major 11 contributor to the valley of death. Technologies become obsolete on... funding model of the acquisition system. Create an individual budget account to fund the development of promising technologies. The Acquisition

  17. 48 CFR 970.5204-1 - Counterintelligence.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Counterintelligence. 970.5204-1 Section 970.5204-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses...

  18. 48 CFR 970.2701 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 970.2701 Section 970.2701 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2701 General. ...

  19. 48 CFR 511.602 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., energy, and civil emergency preparedness program requirements and to provide an operating system to... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false General. 511.602 Section 511.602 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND...

  20. 48 CFR 511.602 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., energy, and civil emergency preparedness program requirements and to provide an operating system to... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false General. 511.602 Section 511.602 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND...

  1. 48 CFR 511.602 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., energy, and civil emergency preparedness program requirements and to provide an operating system to... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false General. 511.602 Section 511.602 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND...

  2. 48 CFR 511.602 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., energy, and civil emergency preparedness program requirements and to provide an operating system to... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false General. 511.602 Section 511.602 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND...

  3. 48 CFR 511.602 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., energy, and civil emergency preparedness program requirements and to provide an operating system to... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false General. 511.602 Section 511.602 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION COMPETITION AND...

  4. 48 CFR 970.0970 - Performance guarantees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...

  5. 48 CFR 970.0970 - Performance guarantees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...

  6. 48 CFR 970.0970 - Performance guarantees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...

  7. 48 CFR 970.0970 - Performance guarantees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance guarantees. 970.0970 Section 970.0970 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contractor Qualifications 970.0970 Performance...

  8. 48 CFR 2944.302 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with the OASAM Business Operations Center's Division of Acquisition Management Services and the... Section 2944.302 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT... authority of the Assistant Secretary for Administration and Management under FAR 44.302(a), to raise or...

  9. Internally versus externally mediated triggers in the acquisition of visual targets in the horizontal plane.

    PubMed

    Kolev, Ognyan I; Reschke, Millard F

    2014-06-01

    In an operational setting acquisition of visual targets using both head and eye movements can be driven by memorized sequence of commands - internal triggering (IT) or by commands issued through secondary operator - external triggering (ET). The primary objective of our research was to examine differences in target acquisition using IT compared with ET. Using a forced time optimal strategy eight subjects were required to acquire targets with angular offsets of ±20°, 30° and 60° along the horizontal plane in both IT and ET conditions. The data showed that the eye/head latency difference in IT condition is longer than that for ET, the target acquisition time is also longer for IT commands. Consistent with this finding were similar results when examining the peak head velocity and peak head acceleration. Under IT protocol head amplitude is higher than when using ET. In conclusion, the study demonstrates that the pattern of performance of target acquisition task is influenced by the way of command triggering. Copyright © 2014 Elsevier B.V. All rights reserved.

  10. Operating force information on-line acquisition of a novel slave manipulator for vascular interventional surgery.

    PubMed

    Zhao, Yan; Guo, Shuxiang; Xiao, Nan; Wang, Yuxin; Li, Youxiang; Jiang, Yuhua

    2018-04-02

    Vascular interventional surgery has its advantages compared to traditional operation. Master-slave robotic technology can further improve the operation accuracy, efficiency and safety of this complicated and high risk surgery. However, on-line acquisition of operating force information of catheter and guidewire remains to be a significant obstacle on the path to enhancing robotic surgery safety. Thus, a novel slave manipulator is proposed in this paper to realize on-line sensing of guidewire torsional operating torque and axial operation force during robotic assisted operations. A strain sensor is specially designed to detect the small scale torsional operation torque with low rotational frequency. Additionally, the axial operating force is detected via a load cell, which is incorporated into a sliding mechanism to eliminate the influence of friction. For validation, calibration and performance evaluation experiments are conducted. The results indicate that the proposed operation torque and force detection device is effective. Thus, it can provide the foundation for enabling accurate haptic feedback to the surgeon to improve surgical safety.

  11. Synergism of He-3 acquisition with lunar base evolution

    NASA Technical Reports Server (NTRS)

    Crabb, T. M.; Jacobs, M. K.

    1992-01-01

    Researchers have discovered that the lunar surface contains a valuable fusion fuel element that is relatively scarce on Earth. This element, He-3, originates from the solar wind that has bombarded the surface of the Moon over geologic time. Mining operations to recover this resource would allow the by-product acquisition of hydrogen, water, carbon dioxide, carbon monoxide, methane, and nitrogen from the lunar surface with relatively minimal additional resource investment when compared to the costs to supply these resources from Earth. Two configurations for the He-3 mining system are discussed, and the impacts of these mining operations on a projected lunar base scenario are assessed. We conclude that the acquisition of He-3 is feasible with minimal advances in current state-of-the-art technologies and could support a terrestrial nuclear fusion power economy with the lowest hazard risk of any nuclear reaction known. Also, the availability of the by-products of He-3 acquisition from the Moon could significantly reduce the operational requirements of a lunar base and increase the commercialization potential of the base through consumable resupply of the lunar base itself, other components of the space infrastructure, and other space missions.

  12. Development and operation of a real-time data acquisition system for the NASA, Langley Research Center Differential Absorption Lidar

    NASA Technical Reports Server (NTRS)

    Butler, C.; Kindle, E. C.

    1984-01-01

    The capabilities of the DIAL data acquisition system (DAS) for the remote measurement of atmospheric trace gas concentrations from ground and aircraft platforms were extended through the purchase and integration of other hardware and the implementation of improved software. An operational manual for the current system is presented. Hardware and peripheral device registers are outlined only as an aid in debugging any DAS problems which may arise.

  13. Role of TDRSS in tracking and data acquisition

    NASA Technical Reports Server (NTRS)

    Spearing, R. E.

    1980-01-01

    The integration and operation of the Tracking Data Relay Satellite System (TDRSS) into the NASA Communications Network (NASCOM) equipment and services is described. The system concept employs spacecraft in geosynchronous orbit, operating as communications front-ends, and a single ground terminal, which provides primary tracking and data acquisition services for earth-orbiting user satellites and for the Space Shuttle. The TDRSS system is further characterized by real-time throughput of user data and a high degree of automation.

  14. USMC Contingency Contracting Force: An Analysis of Transient Officers in a Rapidly Changing Acquisition Environment

    DTIC Science & Technology

    2016-06-01

    and skills needed to manage the department’s acquisition system” (2008, p. 268). Relating back to the CCF, an overpopulation of lieutenant colonels...an individual task. Officers should subsequently be deployed in real world operations based upon the levels of technical competency they have...therefore, officers that transfer to the ECP need to be engaged in real- world operations as soon as possible to retain the skills obtained during

  15. 48 CFR 970.0371-4 - Gratuities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Gratuities. 970.0371-4 Section 970.0371-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of...

  16. 48 CFR 970.0371-2 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Applicability. 970.0371-2 Section 970.0371-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of...

  17. 48 CFR 970.0309-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Applicability. 970.0309-1 Section 970.0309-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of...

  18. 48 CFR 970.0371-3 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Definition. 970.0371-3 Section 970.0371-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of...

  19. 48 CFR 970.0371-9 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clause. 970.0371-9 Section 970.0371-9 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  20. 48 CFR 970.0370-2 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clause. 970.0370-2 Section 970.0370-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  1. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  2. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  3. 48 CFR 570.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... profit, is independently-owned and operated, is not dominant in the field of leasing commercial real... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Definitions. 570.102 Section 570.102 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING...

  4. 48 CFR 570.102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... profit, is independently-owned and operated, is not dominant in the field of leasing commercial real... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Definitions. 570.102 Section 570.102 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING...

  5. 48 CFR 570.102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... profit, is independently-owned and operated, is not dominant in the field of leasing commercial real... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Definitions. 570.102 Section 570.102 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING...

  6. 48 CFR 570.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... profit, is independently-owned and operated, is not dominant in the field of leasing commercial real... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Definitions. 570.102 Section 570.102 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CONTRACTING...

  7. 48 CFR 970.2305-3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Definitions. 970.2305-3 Section 970.2305-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy...

  8. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  9. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  10. 48 CFR 1346.601 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 1346.601 Section 1346.601 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT QUALITY ASSURANCE Material Inspection and Receiving Reports 1346.601 General. Each DOC operating unit shall develop...

  11. 48 CFR 970.3770-2 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false [Reserved] 970.3770-2 Section 970.3770-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770-2 [Reserved] ...

  12. 48 CFR 1404.7003 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operational purposes that have no public interest, educational, scientific, or research value; (b) Classified... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Exceptions. 1404.7003 Section 1404.7003 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE...

  13. 48 CFR 970.2703 - Patent rights.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  14. 48 CFR 617.602 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Policy. 617.602 Section 617.602 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 617.602 Policy. The Assistant...

  15. 48 CFR 970.1504 - Contract pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  16. 75 FR 18035 - Defense Federal Acquisition Regulation Supplement; Acquisitions in Support of Operations in Iraq...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Iraq and Afghanistan with U.S. funds will generally not impact the economic viability of individual... that this final rule will not have a significant economic impact on a substantial number of small...

  17. 48 CFR 970.1170 - Work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Work authorization. 970.1170 Section 970.1170 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170 Work authorization. ...

  18. 48 CFR 970.1170 - Work authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Work authorization. 970.1170 Section 970.1170 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170 Work authorization. ...

  19. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  20. 48 CFR 970.2770 - Technology Transfer.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technology Transfer. 970.2770 Section 970.2770 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770 Technology Transfer. ...

  1. 48 CFR 970.2770 - Technology Transfer.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technology Transfer. 970.2770 Section 970.2770 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770 Technology Transfer. ...

  2. 48 CFR 970.2770 - Technology Transfer.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technology Transfer. 970.2770 Section 970.2770 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770 Technology Transfer. ...

  3. 48 CFR 970.2770 - Technology Transfer.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technology Transfer. 970.2770 Section 970.2770 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770 Technology Transfer. ...

  4. 48 CFR 316.505 - Ordering.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and delivery-order ombudsman is the Director, Strategic Acquisition Service, PSC. The task-order and... Services HRSA: Associate Administrator, Office of Operations IHS: Director, Office of Management Services... Senior Advisor to the Director (Other than R & D) PSC: Director, Strategic Acquisition Service SAMHSA...

  5. 48 CFR 970.3002 - CAS program requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false CAS program requirements. 970.3002 Section 970.3002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Cost Accounting Standards Administration 970...

  6. 48 CFR 970.3002-1 - CAS applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false CAS applicability. 970.3002-1 Section 970.3002-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Cost Accounting Standards Administration 970...

  7. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  8. 48 CFR 970.2770 - Technology Transfer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technology Transfer. 970.2770 Section 970.2770 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770 Technology Transfer. ...

  9. 48 CFR 970.2703 - Patent rights.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  10. 48 CFR 970.2703 - Patent rights.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  11. 48 CFR 970.2703 - Patent rights.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  12. 48 CFR 970.2703 - Patent rights.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  13. Characterization of high temporal resolution prr acquisition by fast comtec card: Deadtime, PRR desaturation, temperature calibration and retrieval.

    NASA Astrophysics Data System (ADS)

    Martucci, Giovanni; Simeonov, Valentin; Renaud, Ludovic; Haefele, Alexander

    2018-04-01

    RAman Lidar for Meteorological Observations (RALMO) is operated at MeteoSwiss and provides continuous measurements of water vapor and temperature since 2010. While the water vapor has been acquired by a Licel acquisition system since 2008, the temperature channels have been migrated to a Fastcom P7888 acquisition system, since August 2015. We present a characterization of this new acquisition system, namely its dead-time, desaturation, temporal stability of the Pure Rotational Raman signals and the retrieval of the PRR-temperature.

  14. X-Band Acquisition Aid Software

    NASA Technical Reports Server (NTRS)

    Britcliffe, Michael J.; Strain, Martha M.; Wert, Michael

    2011-01-01

    The X-band Acquisition Aid (AAP) software is a low-cost acquisition aid for the Deep Space Network (DSN) antennas, and is used while acquiring a spacecraft shortly after it has launched. When enabled, the acquisition aid provides corrections to the antenna-predicted trajectory of the spacecraft to compensate for the variations that occur during the actual launch. The AAP software also provides the corrections to the antenna-predicted trajectory to the navigation team that uses the corrections to refine their model of the spacecraft in order to produce improved antenna-predicted trajectories for each spacecraft that passes over each complex. The software provides an automated Acquisition Aid receiver calibration, and provides graphical displays to the operator and remote viewers via an Ethernet connection. It has a Web server, and the remote workstations use the Firefox browser to view the displays. At any given time, only one operator can control any particular display in order to avoid conflicting commands from more than one control point. The configuration and control is accomplished solely via the graphical displays. The operator does not have to remember any commands. Only a few configuration parameters need to be changed, and can be saved to the appropriate spacecraft-dependent configuration file on the AAP s hard disk. AAP automates the calibration sequence by first commanding the antenna to the correct position, starting the receiver calibration sequence, and then providing the operator with the option of accepting or rejecting the new calibration parameters. If accepted, the new parameters are stored in the appropriate spacecraft-dependent configuration file. The calibration can be performed on the Sun, greatly expanding the window of opportunity for calibration. The spacecraft traditionally used for calibration is in view typically twice per day, and only for about ten minutes each pass.

  15. Association of market, mission, operational, and financial factors on hospital acquisition prices: 1999 through 2001.

    PubMed

    McCue, Michael J; Kim, Tae Hyun

    2005-01-01

    Since the Balanced Budget Act of 1997, there has been a decline in the number of hospital acquisitions. Using data from 1999 through 2001, we examined the relationship between market, mission, operational, and financial factors on hospital acquisition prices. Using an ordinary least squares regression model, we found that acquiring multihospital systems paid a higher price for larger hospitals with fewer unoccupied beds and greater profitability. Although only marginally significant, we also found that acquiring hospital systems paid a higher purchase price for hospitals in near urban markets and for hospitals located in the Central region of the United States. From a policy standpoint, we found no significant difference in the purchase price paid between for-profit and nonprofit hospitals.

  16. Controller and interface module for the High-Speed Data Acquisition System correlator/accumulator

    NASA Technical Reports Server (NTRS)

    Brokl, S. S.

    1985-01-01

    One complex channel of the High-Speed Data Acquisition System (a subsystem used in the Goldstone solar system radar), consisting of two correlator modules and one accumulator module, is operated by the controller and interface module interfaces are provided to the VAX UNIBUS for computer control, monitor, and test of the controller and correlator/accumulator. The correlator and accumulator modules controlled by this module are the key digital signal processing elements of the Goldstone High-Speed Data Acquisition System. This fully programmable unit provides for a wide variety of correlation and filtering functions operating on a three megaword/second data flow. Data flow is to the VAX by way of the I/O port of a FPS 5210 array processor.

  17. Acquisition Logistics Guidelines for Improving the Argentine Air Force Weapon System Acquisition Process

    DTIC Science & Technology

    1999-03-01

    these kinds of sources: Industry standards Other commercial or military customers LMI specification summaries Contractor’s in-house data Section...government and industry managers to achieve program objectives. • Putting in place for fielded systems additional incentives to reduce operating and...meaning clarifications; an explanation of the roles of Congress, the Executive Branch, and Industry in defense acquisition; and an overview on the

  18. Cooperative Engagement Capability (CEC)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-582 Cooperative Engagement Capability (CEC) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 17, 2016 12:13:59 UNCLASSIFIED CEC December 2015 SAR March 17, 2016 12:13:59 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost CEC December 2015 SAR March 17, 2016 12

  19. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  20. A distributed data acquisition software scheme for the Laboratory Telerobotic Manipulator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, P.L.; Glassell, R.L.; Rowe, J.C.

    1990-01-01

    A custom software architecture was developed for use in the Laboratory Telerobotic Manipulator (LTM) to provide support for the distributed data acquisition electronics. This architecture was designed to provide a comprehensive development environment that proved to be useful for both hardware and software debugging. This paper describes the development environment and the operational characteristics of the real-time data acquisition software. 8 refs., 5 figs.

  1. Characterization of Decision Making Behaviors Associated with Human Systems Integration (HSI) Design Tradeoffs: Subject Matter Expert Interviews

    DTIC Science & Technology

    2014-11-18

    this research was to characterize the naturalistic decision making process used in Naval Aviation acquisition to assess cost, schedule and...Naval Aviation acquisitions can be identified, which can support the future development of new processes and tools for training and decision making...part of Department of Defense acquisition processes , HSI ensures that operator, maintainer and sustainer considerations are incorporated into

  2. 3D acquisition and modeling for flint artefacts analysis

    NASA Astrophysics Data System (ADS)

    Loriot, B.; Fougerolle, Y.; Sestier, C.; Seulin, R.

    2007-07-01

    In this paper, we are interested in accurate acquisition and modeling of flint artefacts. Archaeologists needs accurate geometry measurements to refine their understanding of the flint artefacts manufacturing process. Current techniques require several operations. First, a copy of a flint artefact is reproduced. The copy is then sliced. A picture is taken for each slice. Eventually, geometric information is manually determined from the pictures. Such a technique is very time consuming, and the processing applied to the original, as well as the reproduced object, induces several measurement errors (prototyping approximations, slicing, image acquisition, and measurement). By using 3D scanners, we significantly reduce the number of operations related to data acquisition and completely suppress the prototyping step to obtain an accurate 3D model. The 3D models are segmented into sliced parts that are then analyzed. Each slice is then automatically fitted by mathematical representation. Such a representation offers several interesting properties: geometric features can be characterized (e.g. shapes, curvature, sharp edges, etc), and a shape of the original piece of stone can be extrapolated. The contributions of this paper are an acquisition technique using 3D scanners that strongly reduces human intervention, acquisition time and measurement errors, and the representation of flint artefacts as mathematical 2D sections that enable accurate analysis.

  3. 48 CFR 17.604 - Identifying management and operating contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Identifying management and... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.604 Identifying management and operating contracts. A management and operating contract is...

  4. 48 CFR 17.604 - Identifying management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Identifying management and... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.604 Identifying management and operating contracts. A management and operating contract is...

  5. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  6. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  7. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  8. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  9. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  10. 48 CFR 970.1103-4 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103-4 Section 970.1103-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract...

  11. 48 CFR 970.0371-1 - Scope of section.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope of section. 970.0371-1 Section 970.0371-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  12. 48 CFR 970.0371-1 - Scope of section.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Scope of section. 970.0371-1 Section 970.0371-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  13. 48 CFR 970.0371-1 - Scope of section.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope of section. 970.0371-1 Section 970.0371-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  14. 48 CFR 970.0371-1 - Scope of section.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope of section. 970.0371-1 Section 970.0371-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  15. 48 CFR 970.0371-1 - Scope of section.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope of section. 970.0371-1 Section 970.0371-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  16. 48 CFR 970.0404-2 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 970.0404-2 Section 970.0404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0404-2 General. (a) Guidance...

  17. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  18. 48 CFR 970.2702-4 - Royalties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Royalties. 970.2702-4 Section 970.2702-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702-4 Royalties...

  19. 48 CFR 970.2702 - Patent related clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent related clauses. 970.2702 Section 970.2702 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702 Patent...

  20. 48 CFR 970.1707 - Work for others.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Work for others. 970.1707 Section 970.1707 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707 Work for others. ...

  1. The DOE/NASA wind turbine data acquisition system. Part 3: Unattended power performance monitor

    NASA Technical Reports Server (NTRS)

    Halleyy, A.; Heidkamp, D.; Neustadter, H.; Olson, R.

    1983-01-01

    Software documentation, operational procedures, and diagnostic instructions for development version of an unattended wind turbine performance monitoring system is provided. Designed to be used for off line intelligent data acquisition in conjunction with the central host computer.

  2. 48 CFR 970.0404-3 - Responsibilities of contracting officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Responsibilities of contracting officers. 970.0404-3 Section 970.0404-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970...

  3. 48 CFR 209.571-1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Acquisition Program. “Pre-Major Defense Acquisition Program” means a program that is in the Materiel Solution...) Directing other contractors' (other than subcontractors) operations; (I) Developing test requirements and evaluating test data; (J) Developing work statements (but see paragraph (ii)(B) of this definition). (ii...

  4. Telecommunications and data acquisition

    NASA Technical Reports Server (NTRS)

    Renzetti, N. A. (Editor)

    1981-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operations is reported. In addition, developments in Earth based radio technology as applied to geodynamics, astrophysics, and the radio search for extraterrestrial intelligence are reported.

  5. 48 CFR 1301.304 - Agency control and compliance procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Agency control and compliance procedures. 1301.304 Section 1301.304 Federal Acquisition Regulations System DEPARTMENT OF....304 Agency control and compliance procedures. Operating unit counsel shall limit issuance of...

  6. 48 CFR 970.0808-2 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Policy. 970.0808-2 Section 970.0808-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Management and operating contractors shall provide or secure duplication and printing services in accordance...

  7. 48 CFR 970.0808-2 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Policy. 970.0808-2 Section 970.0808-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Management and operating contractors shall provide or secure duplication and printing services in accordance...

  8. 48 CFR 970.0808-2 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Policy. 970.0808-2 Section 970.0808-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Management and operating contractors shall provide or secure duplication and printing services in accordance...

  9. 48 CFR 970.0808-2 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Policy. 970.0808-2 Section 970.0808-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Management and operating contractors shall provide or secure duplication and printing services in accordance...

  10. 48 CFR 970.0808-2 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Policy. 970.0808-2 Section 970.0808-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY.... Management and operating contractors shall provide or secure duplication and printing services in accordance...

  11. 48 CFR 2901.201-1 - Maintenance of the FAR.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Division of Acquisition Management Services (DAMS), an organization within the Office of Acquisition and Management Support Services, the Business Operations Center, Office of the Assistant Secretary for Administration and Management (OASAM), represents the Department of Labor on the Civilian Agency...

  12. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  13. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  14. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  15. 48 CFR 970.2702 - Patent related clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent related clauses. 970.2702 Section 970.2702 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702 Patent...

  16. 48 CFR 970.2702 - Patent related clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent related clauses. 970.2702 Section 970.2702 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702 Patent...

  17. 48 CFR 970.2702 - Patent related clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent related clauses. 970.2702 Section 970.2702 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702 Patent...

  18. 48 CFR 970.2702 - Patent related clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent related clauses. 970.2702 Section 970.2702 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702 Patent...

  19. AIM-9X Block II Sidewinder (AIM-9X Blk II)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report (SAR) RCS: DD- A &T(Q& A )823-442 AIM-9X Block II Sidewinder (AIM-9X Blk II) As of FY 2017 President’s Budget Defense...MDAP - Major Defense Acquisition Program MILCON - Military Construction N/ A - Not Applicable O&M - Operations and Maintenance ORD - Operational...15:14:10 UNCLASSIFIED 5 Mission and Description The AIM-9X Block II Sidewinder (AIM-9X Blk II) short-range air-to-air missile is a long term

  20. Assess program: Interactive data management systems for airborne research

    NASA Technical Reports Server (NTRS)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  1. Technical Performance Assessment: Mission Success in Software Acquisition Management

    DTIC Science & Technology

    2010-04-27

    Examples Design constraints make software acquisition and development t l iti lex reme y cr ca Application domain – Operational Flight Program, Air...environment – used to produce the software Ri k t t bli h d d i t i d i k ts managemen – es a s e an ma n a ne r s managemen systems Milestone reviews...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that

  2. Telecommunications and data acquisition systems support for Voyager missions to Jupiter and Saturn, 1972-1981, prelaunch through Saturn encounter

    NASA Technical Reports Server (NTRS)

    Traxler, M. R.; Beauchamp, D. F.

    1983-01-01

    The Deep Space Network has supported the Voyager Project for approximately nine years, during which time implementation, testing, and operational support was provided. Four years of this time involved testing prior to launch; the final five years included network operations support and additional network implementation. Intensive and critical support intervals included launch and four planetary encounters. The telecommunications and data acquisition support for the Voyager Missions to Jupiter and Saturn are summarized.

  3. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    This publication reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation and in operations. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. This publication also reports on implementation and operations for searching the microwave spectrum.

  4. An Analysis of the United States Special Operations Command’s Acquisition Process to Determine Its Compliance with Acquisition Reform Initiatives of the Past Decade

    DTIC Science & Technology

    1996-12-01

    This includes an exemption from publishing the opportunity in the Commerce Business Daily ( CBD ) and elimination of the requirement to hold the...of assigned programs. In discharging this responsibility, thc 990 coor.int-tes his efforts with ether ASN(RDMA) offices, b. TEFlO..M-VAL OPERATIONS...Communications, Computers and Information Systems CA Civil Affairs CAIV Cost as an Independent Variable CBD Commerce Business Daily CBPL Capabilities

  5. Services Acquisition in the Department of Defense: Analysis of Operational and Performance Data to Identify Drivers of Success

    DTIC Science & Technology

    2015-03-24

    improving the disclosure of CPARS program office Audit results (Black et al., 2014, pp. 48–49). Acquisition Research Program Graduate School of...improving the disclosure of CPARS program office audit results (Black et al., 2014, pp. 44–49). Recommendations Based on our conclusions, we identified...Fitzsimmons, J. A., & Fitzsimmons, M. J. (2006). Service management: Operations, strategy, and information technology (5th ed.). New York, NY: McGraw -Hill

  6. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1992-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information. In the search for extraterrestrial intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. Topics covered include tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; network upgrade and sustaining; network operations and operations support; and TDA program management and analysis.

  7. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1992-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Data Acquisition (TDA) Office. In the Search for Extraterrestrial Intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. In solar system radar, it reports on the uses of the Goldstone Solar System Radar for scientific exploration of the planets, their rings and satellites, asteroids, and comets. In radio astronomy, the areas of support include spectroscopy, very long baseline interferometry, and astrometry. These three programs are performed for NASA's Office of Space Science and Applications (OSSA) with the Office of Space Operations for funding DSN operational support.

  8. Acquisition of Skill Proficiency Over Multiple Sessions of a Novel Rover Simulation

    NASA Technical Reports Server (NTRS)

    Dean, S. L.; DeDios,Y. E.; MacDougall, H. G.; Moore, S. T.; Wood, S. J.

    2011-01-01

    Following long-duration exploration transits, adaptive changes in sensorimotor function may impair the crew's ability to safely perform manual control tasks such as operating pressurized rovers. Postflight performance will also be influenced by the level of preflight skill proficiency they have attained. The purpose of this study was to characterize the acquisition of skills in a motion-based rover simulation over multiple sessions, and to investigate the effects of varying the simulation scenarios. METHODS: Twenty healthy subjects were tested in 5 sessions, with 1-3 days between sessions. Each session consisted of a serial presentation of 8 discrete tasks to be completed as quickly and accurately as possible. Each task consisted of 1) perspective-taking, using a map that defined a docking target, 2) navigation toward the target around a Martian outpost, and 3) docking a side hatch of the rover to a visually guided target. The simulator utilized a Stewart-type motion base (CKAS, Australia), single-seat cabin with triple scene projection covering 150 deg horizontal by 50 deg vertical, and joystick controller. Subjects were randomly assigned to a control group (tasks identical in the first 4 sessions) or a varied-practice group. The dependent variables for each task included accuracy toward the target and time to completion. RESULTS: The greatest improvements in time to completion occurred during the docking phase. The varied-practice group showed more improvement in perspective-taking accuracy. Perspective-taking accuracy was also affected by the relative orientation of the rover to the docking target. Skill acquisition was correlated with self-ratings of previous gaming experience. DISCUSSION: Varying task selection and difficulty will optimize the preflight acquisition of skills when performing novel operational tasks. Simulation of operational manual control will provide functionally relevant evidence regarding the impact of sensorimotor adaptation on early surface operations and what countermeasures are needed. Learning Objective: The use of a motion-based simulation to investigate decrements in the proficiency to operate pressurized rovers during early surface operations of space exploration missions, along with the acquisition of skill proficiency needed during the preflight phase of the mission.

  9. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  10. 48 CFR 970.0371-8 - Employee disclosure concerning other employment services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Employee disclosure concerning other employment services. 970.0371-8 Section 970.0371-8 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper...

  11. The telecommunications and data acquisition report

    NASA Technical Reports Server (NTRS)

    Renzetti, N. A.

    1980-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implemention, and operations is documented. In addition, developments in Earth based radio technology as applied to geodynamics, astrophysics, and the radio search for extraterrestrial intelligence are reported.

  12. 48 CFR 970.2200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope of subpart. 970.2200 Section 970.2200 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2200 Scope of subpart...

  13. 48 CFR 917.600 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope of subpart. 917.600 Section 917.600 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 917.600 Scope of subpart. (a...

  14. 48 CFR 917.600 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope of subpart. 917.600 Section 917.600 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 917.600 Scope of subpart. (a...

  15. 48 CFR 970.0808-00 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope. 970.0808-00 Section 970.0808-00 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-00 Scope...

  16. 48 CFR 970.2200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope of subpart. 970.2200 Section 970.2200 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2200 Scope of subpart...

  17. 48 CFR 970.2200 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Scope of subpart. 970.2200 Section 970.2200 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2200 Scope of subpart...

  18. 48 CFR 917.600 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope of subpart. 917.600 Section 917.600 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 917.600 Scope of subpart. (a...

  19. 48 CFR 970.2200 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope of subpart. 970.2200 Section 970.2200 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2200 Scope of subpart...

  20. 48 CFR 970.2200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope of subpart. 970.2200 Section 970.2200 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2200 Scope of subpart...

  1. 48 CFR 970.1504-1 - Price analysis.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Price analysis. 970.1504-1 Section 970.1504-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1 Price analysis. ...

  2. 77 FR 33560 - Southwest Pennsylvania Railroad Company-Acquisition Exemption-Laurel Hill Development Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Pennsylvania Railroad Company--Acquisition Exemption-- Laurel Hill Development Corporation Southwest Pennsylvania Railroad Company (SPRC), a Class III rail carrier, has filed a verified notice of exemption under... specified points in Pennsylvania, and in Southwest Pennsylvania Railroad Company--Operation Exemption--CSX...

  3. 48 CFR 970.2903 - State and local taxes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false State and local taxes. 970.2903 Section 970.2903 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2903 State and local taxes. ...

  4. 48 CFR 970.2903 - State and local taxes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false State and local taxes. 970.2903 Section 970.2903 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2903 State and local taxes. ...

  5. 48 CFR 970.1504-1 - Price analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Price analysis. 970.1504-1 Section 970.1504-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1 Price analysis. ...

  6. 48 CFR 970.2702-1 - Authorization and consent.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Authorization and consent. 970.2702-1 Section 970.2702-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702-1...

  7. 48 CFR 970.2704 - Rights in data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Rights in data. 970.2704 Section 970.2704 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2704 Rights in data. ...

  8. 48 CFR 970.2702-3 - Patent indemnity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity. 970.2702-3 Section 970.2702-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702-3 Patent...

  9. 48 CFR 970.2201-1 - Labor relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Labor relations. 970.2201-1 Section 970.2201-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2201-1 Labor...

  10. 48 CFR 970.2201 - Basic labor policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Basic labor policies. 970.2201 Section 970.2201 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2201 Basic labor policies. ...

  11. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1986-01-01

    Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operations is documented. In addition, developments in Earth-based radio technology as applied to geodynamics, astrophysics and the radio search for extraterrestrial intelligence are reported.

  12. 75 FR 7303 - Drake Cement, LLC-Acquisition Exemption-Clarkdale Arizona Central Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35350] Drake Cement, LLC--Acquisition Exemption--Clarkdale Arizona Central Railroad, LLC Drake Cement, LLC (DC), a..., Drake Switching Company, LLC --Operation Exemption-- Drake Cement, LLC. DC certifies that the projected...

  13. Report: CSB Needs to Improve Its Acquisition Approvals and Other Processes to Ensure Best Value for Taxpayers

    EPA Pesticide Factsheets

    Report #15-P-0245, July 31, 2015. CSB's acquisition process is at risk and may have ineffective operations without a strategy to implement controls. Further, CSB has limited evidence it contracted at the best value.

  14. 48 CFR 370.502 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL PROGRAMS AFFECTING ACQUISITION Acquisitions Under the Buy Indian Act 370.502 Definitions. (a) Buy Indian contract means any contract involving activities covered by the Buy Indian Act that is negotiated... business organization owned, controlled, and operated by one or more Indians (including, for the purpose of...

  15. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...

  16. Combining factual and heuristic knowledge in knowledge acquisition

    NASA Technical Reports Server (NTRS)

    Gomez, Fernando; Hull, Richard; Karr, Clark; Hosken, Bruce; Verhagen, William

    1992-01-01

    A knowledge acquisition technique that combines heuristic and factual knowledge represented as two hierarchies is described. These ideas were applied to the construction of a knowledge acquisition interface to the Expert System Analyst (OPERA). The goal of OPERA is to improve the operations support of the computer network in the space shuttle launch processing system. The knowledge acquisition bottleneck lies in gathering knowledge from human experts and transferring it to OPERA. OPERA's knowledge acquisition problem is approached as a classification problem-solving task, combining this approach with the use of factual knowledge about the domain. The interface was implemented in a Symbolics workstation making heavy use of windows, pull-down menus, and other user-friendly devices.

  17. Role of quality of service metrics in visual target acquisition and tracking in resource constrained environments

    NASA Astrophysics Data System (ADS)

    Anderson, Monica; David, Phillip

    2007-04-01

    Implementation of an intelligent, automated target acquisition and tracking systems alleviates the need for operators to monitor video continuously. This system could identify situations that fatigued operators could easily miss. If an automated acquisition and tracking system plans motions to maximize a coverage metric, how does the performance of that system change when the user intervenes and manually moves the camera? How can the operator give input to the system about what is important and understand how that relates to the overall task balance between surveillance and coverage? In this paper, we address these issues by introducing a new formulation of the average linear uncovered length (ALUL) metric, specially designed for use in surveilling urban environments. This metric coordinates the often competing goals of acquiring new targets and tracking existing targets. In addition, it provides current system performance feedback to system users in terms of the system's theoretical maximum and minimum performance. We show the successful integration of the algorithm via simulation.

  18. The data acquisition system for the ANTARES neutrino telescope

    NASA Astrophysics Data System (ADS)

    Aguilar, J. A.; Albert, A.; Ameli, F.; Anghinolfi, M.; Anton, G.; Anvar, S.; Aslanides, E.; Aubert, J.-J.; Barbarito, E.; Basa, S.; Battaglieri, M.; Becherini, Y.; Bellotti, R.; Beltramelli, J.; Bertin, V.; Bigi, A.; Billault, M.; Blaes, R.; de Botton, N.; Bouwhuis, M. C.; Bradbury, S. M.; Bruijn, R.; Brunner, J.; Burgio, G. F.; Busto, J.; Cafagna, F.; Caillat, L.; Calzas, A.; Capone, A.; Caponetto, L.; Carmona, E.; Carr, J.; Cartwright, S. L.; Castel, D.; Castorina, E.; Cavasinni, V.; Cecchini, S.; Ceres, A.; Charvis, P.; Chauchot, P.; Chiarusi, T.; Circella, M.; Colnard, C.; Compère, C.; Coniglione, R.; Cottini, N.; Coyle, P.; Cuneo, S.; Cussatlegras, A.-S.; Damy, G.; van Dantzig, R.; de Marzo, C.; Dekeyser, I.; Delagnes, E.; Denans, D.; Deschamps, A.; Dessages-Ardellier, F.; Destelle, J.-J.; Dinkespieler, B.; Distefano, C.; Donzaud, C.; Drogou, J.-F.; Druillole, F.; Durand, D.; Ernenwein, J.-P.; Escoffier, S.; Falchini, E.; Favard, S.; Feinstein, F.; Ferry, S.; Festy, D.; Fiorello, C.; Flaminio, V.; Galeotti, S.; Gallone, J.-M.; Giacomelli, G.; Girard, N.; Gojak, C.; Goret, Ph.; Graf, K.; Hallewell, G.; Harakeh, M. N.; Hartmann, B.; Heijboer, A.; Heine, E.; Hello, Y.; Hernández-Rey, J. J.; Hößl, J.; Hoffman, C.; Hogenbirk, J.; Hubbard, J. R.; Jaquet, M.; Jaspers, M.; de Jong, M.; Jouvenot, F.; Kalantar-Nayestanaki, N.; Kappes, A.; Karg, T.; Karkar, S.; Katz, U.; Keller, P.; Kok, H.; Kooijman, P.; Kopper, C.; Korolkova, E. V.; Kouchner, A.; Kretschmer, W.; Kruijer, A.; Kuch, S.; Kudryavstev, V. A.; Lachartre, D.; Lafoux, H.; Lagier, P.; Lahmann, R.; Lamanna, G.; Lamare, P.; Languillat, J. C.; Laschinsky, H.; Le Guen, Y.; Le Provost, H.; Le van Suu, A.; Legou, T.; Lim, G.; Lo Nigro, L.; Lo Presti, D.; Loehner, H.; Loucatos, S.; Louis, F.; Lucarelli, F.; Lyashuk, V.; Marcelin, M.; Margiotta, A.; Masullo, R.; Mazéas, F.; Mazure, A.; McMillan, J. E.; Megna, R.; Melissas, M.; Migneco, E.; Milovanovic, A.; Mongelli, M.; Montaruli, T.; Morganti, M.; Moscoso, L.; Musumeci, M.; Naumann, C.; Naumann-Godo, M.; Niess, V.; Olivetto, C.; Ostasch, R.; Palanque-Delabrouille, N.; Payre, P.; Peek, H.; Petta, C.; Piattelli, P.; Pineau, J.-P.; Poinsignon, J.; Popa, V.; Pradier, T.; Racca, C.; Randazzo, N.; van Randwijk, J.; Real, D.; van Rens, B.; Réthoré, F.; Rewiersma, P.; Riccobene, G.; Rigaud, V.; Ripani, M.; Roca, V.; Roda, C.; Rolin, J. F.; Romita, M.; Rose, H. J.; Rostovtsev, A.; Roux, J.; Ruppi, M.; Russo, G. V.; Salesa, F.; Salomon, K.; Sapienza, P.; Schmitt, F.; Schuller, J.-P.; Shanidze, R.; Sokalski, I.; Spona, T.; Spurio, M.; van der Steenhoven, G.; Stolarczyk, T.; Streeb, K.; Stubert, D.; Sulak, L.; Taiuti, M.; Tamburini, C.; Tao, C.; Terreni, G.; Thompson, L. F.; Valdy, P.; Valente, V.; Vallage, B.; Venekamp, G.; Verlaat, B.; Vernin, P.; de Vita, R.; de Vries, G.; van Wijk, R.; de Witt Huberts, P.; Wobbe, G.; de Wolf, E.; Yao, A.-F.; Zaborov, D.; Zaccone, H.; Zornoza, J. D.; Zúñiga, J.

    2007-01-01

    The ANTARES neutrino telescope is being constructed in the Mediterranean Sea. It consists of a large three-dimensional array of photo-multiplier tubes. The data acquisition system of the detector takes care of the digitisation of the photo-multiplier tube signals, data transport, data filtering, and data storage. The detector is operated using a control program interfaced with all elements. The design and the implementation of the data acquisition system are described.

  19. Toward an Operational Proxy for Acquisition Workforce Quality: Measuring Dynamic Knowledge and Performance at the Tactical Edges of Organizations

    DTIC Science & Technology

    2012-10-13

    Business & Public Policy Naval Postgraduate School Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection...presented in this report was supported by the Acquisition Research Program of the Graduate School of Business & Public Policy at the Naval...Program GRADUATE SCHOOL OF BUSINESS & PUBLIC POLICY - iii - NAVAL POSTGRADUATE SCHOOL NPS-AM-12-206 ACQUISITION RESEARCH SPONSORED REPORT SERIES

  20. Combat Rescue Helicopter (CRH)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-479 Combat Rescue Helicopter (CRH) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 17, 2016 15:16:47 UNCLASSIFIED CRH December 2015 SAR March 17, 2016 15:16:47 UNCLASSIFIED 2 Table of...Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost CRH December 2015 SAR March 17, 2016 15:16:47

  1. DDG-1000 Zumwalt Class Destroyer (DDG-1000)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-197 DDG 1000 Zumwalt Class Destroyer (DDG 1000) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 23, 2016 15:17:06 UNCLASSIFIED DDG 1000 December 2015 SAR March 23, 2016 15:17:06...Requirements Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost DDG 1000 December 2015 SAR

  2. DDG 51 Arleigh Burke Class Guided Missile Destroyer (DDG 51)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-180 DDG 51 Arleigh Burke Class Guided Missile Destroyer (DDG 51) As of FY 2017 President’s...Budget Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED DDG 51 December 2015 SAR UNCLASSIFIED 2 Table of Contents Common Acronyms...Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost DDG 51 December 2015 SAR UNCLASSIFIED 3 PB - President’s Budget PE - Program

  3. A comparison of foveated acquisition and tracking performance relative to uniform resolution approaches

    NASA Astrophysics Data System (ADS)

    Dubuque, Shaun; Coffman, Thayne; McCarley, Paul; Bovik, A. C.; Thomas, C. William

    2009-05-01

    Foveated imaging has been explored for compression and tele-presence, but gaps exist in the study of foveated imaging applied to acquisition and tracking systems. Results are presented from two sets of experiments comparing simple foveated and uniform resolution targeting (acquisition and tracking) algorithms. The first experiments measure acquisition performance when locating Gabor wavelet targets in noise, with fovea placement driven by a mutual information measure. The foveated approach is shown to have lower detection delay than a notional uniform resolution approach when using video that consumes equivalent bandwidth. The second experiments compare the accuracy of target position estimates from foveated and uniform resolution tracking algorithms. A technique is developed to select foveation parameters that minimize error in Kalman filter state estimates. Foveated tracking is shown to consistently outperform uniform resolution tracking on an abstract multiple target task when using video that consumes equivalent bandwidth. Performance is also compared to uniform resolution processing without bandwidth limitations. In both experiments, superior performance is achieved at a given bandwidth by foveated processing because limited resources are allocated intelligently to maximize operational performance. These findings indicate the potential for operational performance improvements over uniform resolution systems in both acquisition and tracking tasks.

  4. Development and Flight Testing of an Autonomous Landing Gear Health-Monitoring System

    NASA Technical Reports Server (NTRS)

    Woodard, Stanley E.; Coffey, Neil C.; Gonzalez, Guillermo A.; Taylor, B. Douglas; Brett, Rube R.; Woodman, Keith L.; Weathered, Brenton W.; Rollins, Courtney H.

    2003-01-01

    Development and testing of an adaptable vehicle health-monitoring architecture is presented. The architecture is being developed for a fleet of vehicles. It has three operational levels: one or more remote data acquisition units located throughout the vehicle; a command and control unit located within the vehicle; and, a terminal collection unit to collect analysis results from all vehicles. Each level is capable of performing autonomous analysis with a trained expert system. Communication between all levels is done with wireless radio frequency interfaces. The remote data acquisition unit has an eight channel programmable digital interface that allows the user discretion for choosing type of sensors; number of sensors, sensor sampling rate and sampling duration for each sensor. The architecture provides framework for a tributary analysis. All measurements at the lowest operational level are reduced to provide analysis results necessary to gauge changes from established baselines. These are then collected at the next level to identify any global trends or common features from the prior level. This process is repeated until the results are reduced at the highest operational level. In the framework, only analysis results are forwarded to the next level to reduce telemetry congestion. The system's remote data acquisition hardware and non-analysis software have been flight tested on the NASA Langley B757's main landing gear. The flight tests were performed to validate the following: the wireless radio frequency communication capabilities of the system, the hardware design, command and control; software operation; and, data acquisition, storage and retrieval.

  5. Sensor-Based Optimized Control of the Full Load Instability in Large Hydraulic Turbines

    PubMed Central

    Presas, Alexandre; Valero, Carme; Egusquiza, Eduard

    2018-01-01

    Hydropower plants are of paramount importance for the integration of intermittent renewable energy sources in the power grid. In order to match the energy generated and consumed, Large hydraulic turbines have to work under off-design conditions, which may lead to dangerous unstable operating points involving the hydraulic, mechanical and electrical system. Under these conditions, the stability of the grid and the safety of the power plant itself can be compromised. For many Francis Turbines one of these critical points, that usually limits the maximum output power, is the full load instability. Therefore, these machines usually work far away from this unstable point, reducing the effective operating range of the unit. In order to extend the operating range of the machine, working closer to this point with a reasonable safety margin, it is of paramount importance to monitor and to control relevant parameters of the unit, which have to be obtained with an accurate sensor acquisition strategy. Within the framework of a large EU project, field tests in a large Francis Turbine located in Canada (rated power of 444 MW) have been performed. Many different sensors were used to monitor several working parameters of the unit for all its operating range. Particularly for these tests, more than 80 signals, including ten type of different sensors and several operating signals that define the operating point of the unit, were simultaneously acquired. The present study, focuses on the optimization of the acquisition strategy, which includes type, number, location, acquisition frequency of the sensors and corresponding signal analysis to detect the full load instability and to prevent the unit from reaching this point. A systematic approach to determine this strategy has been followed. It has been found that some indicators obtained with different types of sensors are linearly correlated with the oscillating power. The optimized strategy has been determined based on the correlation characteristics (linearity, sensitivity and reactivity), the simplicity of the installation and the acquisition frequency necessary. Finally, an economic and easy implementable protection system based on the resulting optimized acquisition strategy is proposed. This system, which can be used in a generic Francis turbine with a similar full load instability, permits one to extend the operating range of the unit by working close to the instability with a reasonable safety margin. PMID:29601512

  6. Sensor-Based Optimized Control of the Full Load Instability in Large Hydraulic Turbines.

    PubMed

    Presas, Alexandre; Valentin, David; Egusquiza, Mònica; Valero, Carme; Egusquiza, Eduard

    2018-03-30

    Hydropower plants are of paramount importance for the integration of intermittent renewable energy sources in the power grid. In order to match the energy generated and consumed, Large hydraulic turbines have to work under off-design conditions, which may lead to dangerous unstable operating points involving the hydraulic, mechanical and electrical system. Under these conditions, the stability of the grid and the safety of the power plant itself can be compromised. For many Francis Turbines one of these critical points, that usually limits the maximum output power, is the full load instability. Therefore, these machines usually work far away from this unstable point, reducing the effective operating range of the unit. In order to extend the operating range of the machine, working closer to this point with a reasonable safety margin, it is of paramount importance to monitor and to control relevant parameters of the unit, which have to be obtained with an accurate sensor acquisition strategy. Within the framework of a large EU project, field tests in a large Francis Turbine located in Canada (rated power of 444 MW) have been performed. Many different sensors were used to monitor several working parameters of the unit for all its operating range. Particularly for these tests, more than 80 signals, including ten type of different sensors and several operating signals that define the operating point of the unit, were simultaneously acquired. The present study, focuses on the optimization of the acquisition strategy, which includes type, number, location, acquisition frequency of the sensors and corresponding signal analysis to detect the full load instability and to prevent the unit from reaching this point. A systematic approach to determine this strategy has been followed. It has been found that some indicators obtained with different types of sensors are linearly correlated with the oscillating power. The optimized strategy has been determined based on the correlation characteristics (linearity, sensitivity and reactivity), the simplicity of the installation and the acquisition frequency necessary. Finally, an economic and easy implementable protection system based on the resulting optimized acquisition strategy is proposed. This system, which can be used in a generic Francis turbine with a similar full load instability, permits one to extend the operating range of the unit by working close to the instability with a reasonable safety margin.

  7. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    NASA Astrophysics Data System (ADS)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  8. Collecting cometary soil samples? Development of the ROSETTA sample acquisition system

    NASA Technical Reports Server (NTRS)

    Coste, P. A.; Fenzi, M.; Eiden, Michael

    1993-01-01

    In the reference scenario of the ROSETTA CNRS mission, the Sample Acquisition System is mounted on the Comet Lander. Its tasks are to acquire three kinds of cometary samples and to transfer them to the Earth Return Capsule. Operations are to be performed in vacuum and microgravity, on a probably rough and dusty surface, in a largely unknown material, at temperatures in the order of 100 K. The concept and operation of the Sample Acquisition System are presented. The design of the prototype corer and surface sampling tool, and of the equipment for testing them at cryogenic temperatures in ambient conditions and in vacuum in various materials representing cometary soil, are described. Results of recent preliminary tests performed in low temperature thermal vacuum in a cometary analog ice-dust mixture are provided.

  9. PCDAS Version 2. 2: Remote network control and data acquisition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fishbaugher, M.J.

    1987-09-01

    This manual is intended for both technical and non-technical people who want to use the PCDAS remote network control and data acquisition software. If you are unfamiliar with remote data collection hardware systems designed at Pacific Northwest Laboratory (PNL), this introduction should answer your basic questions. Even if you have some experience with the PNL-designed Field Data Acquisition Systems (FDAS), it would be wise to review this material before attempting to set up a network. This manual was written based on the assumption that you have a rudimentary understanding of personal computer (PC) operations using Disk Operating System (DOS) versionmore » 2.0 or greater (IBM 1984). You should know how to create subdirectories and get around the subdirectory tree.« less

  10. Stress training improves performance during a stressful flight.

    PubMed

    McClernon, Christopher K; McCauley, Michael E; O'Connor, Paul E; Warm, Joel S

    2011-06-01

    This study investigated whether stress training introduced during the acquisition of simulator-based flight skills enhances pilot performance during subsequent stressful flight operations in an actual aircraft. Despite knowledge that preconditions to aircraft accidents can be strongly influenced by pilot stress, little is known about the effectiveness of stress training and how it transfers to operational flight settings. For this study, 30 participants with no flying experience were assigned at random to a stress-trained treatment group or a control group. Stress training consisted of systematic pairing of skill acquisition in a flight simulator with stress coping mechanisms in the presence of a cold pressor. Control participants received identical flight skill acquisition training but without stress training. Participants then performed a stressful flying task in a Piper Archer aircraft. Stress-trained research participants flew the aircraft more smoothly, as recorded by aircraft telemetry data, and generally better, as recorded by flight instructor evaluations, than did control participants. Introducing stress coping mechanisms during flight training improved performance in a stressful flying task. The results of this study indicate that stress training during the acquisition of flight skills may serve to enhance pilot performance in stressful operational flight and, therefore, might mitigate the contribution of pilot stress to aircraft mishaps.

  11. 48 CFR 970.0371-6 - Incompatibility between regular duties and private interests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Incompatibility between regular duties and private interests. 970.0371-6 Section 970.0371-6 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper...

  12. 10 CFR 490.202 - Acquisitions satisfying the mandate.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Acquisitions satisfying the mandate. 490.202 Section 490.202 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory... (regardless of the model year of manufacture), capable of operating on alternative fuels that was not...

  13. 10 CFR 490.202 - Acquisitions satisfying the mandate.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Acquisitions satisfying the mandate. 490.202 Section 490.202 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory... (regardless of the model year of manufacture), capable of operating on alternative fuels that was not...

  14. 10 CFR 490.202 - Acquisitions satisfying the mandate.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Acquisitions satisfying the mandate. 490.202 Section 490.202 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory... (regardless of the model year of manufacture), capable of operating on alternative fuels that was not...

  15. 10 CFR 490.202 - Acquisitions satisfying the mandate.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Acquisitions satisfying the mandate. 490.202 Section 490.202 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory... (regardless of the model year of manufacture), capable of operating on alternative fuels that was not...

  16. 12 CFR 5.53 - Change in asset composition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assets, through subsequent purchases or other acquisitions or other expansions of its operations. This... changes in asset composition that occur as a result of a bank's ordinary and ongoing business of... substantially all of its assets, through subsequent purchases or other acquisitions or other expansions of its...

  17. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1985-01-01

    Deep Space Network (DSN) progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operation is discussed. In addition, developments in Earth-based radio technology as applied to geodynamics, astrophysics and the radio search for extraterrestrial intelligence are reported.

  18. MATREX Leads the Way in Implementing New DOD VV&A Documentation Standards

    DTIC Science & Technology

    2007-05-24

    Acquisition Operations & Support B C Sustainment FRP Decision Review FOC LRIP/IOT& ECritical Design Review Pre-Systems Acquisition Concept...Communications Human Performance Model • C3GRID – Command & Control, Computer GRID • CES – Communications Effects Server • CMS2 – Comprehensive

  19. 40 CFR 75.10 - General operating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring system and a flow monitoring system with an automated data acquisition and handling system for measuring and recording SO2 concentration (in ppm), volumetric gas flow (in scfh), and... emission monitoring system and a flow monitoring system with an automated data acquisition and handling...

  20. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  1. Brief report: learning via the electronic interactive whiteboard for two students with autism and a student with moderate intellectual disability.

    PubMed

    Yakubova, Gulnoza; Taber-Doughty, Teresa

    2013-06-01

    The effects of a multicomponent intervention (a self-operated video modeling and self-monitoring delivered via an electronic interactive whiteboard (IWB) and a system of least prompts) on skill acquisition and interaction behavior of two students with autism and one student with moderate intellectual disability were examined using a multi-probe across students design. Students were taught to operate and view video modeling clips, perform a chain of novel tasks and self-monitor task performance using a SMART Board IWB. Results support the effectiveness of a multicomponent intervention in improving students' skill acquisition. Results also highlight the use of this technology as a self-operated and interactive device rather than a traditional teacher-operated device to enhance students' active participation in learning.

  2. 48 CFR 970.1504-1-3 - Special considerations: Laboratory management and operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: Laboratory management and operation. 970.1504-1-3 Section 970.1504-1-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-3 Special considerations: Laboratory management and operation. (a) For the management...

  3. 48 CFR 36.510 - Operations and storage areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Operations and storage... Operations and storage areas. The contracting officer shall insert the clause at 52.236-10, Operations ald Storage Areas, in solicitations and contracts when a fixed-price construction contract or a fixed-price...

  4. 48 CFR 36.510 - Operations and storage areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Operations and storage... Operations and storage areas. The contracting officer shall insert the clause at 52.236-10, Operations ald Storage Areas, in solicitations and contracts when a fixed-price construction contract or a fixed-price...

  5. 48 CFR 36.510 - Operations and storage areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Operations and storage... Operations and storage areas. The contracting officer shall insert the clause at 52.236-10, Operations ald Storage Areas, in solicitations and contracts when a fixed-price construction contract or a fixed-price...

  6. 77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Award Schedule (MAS) Program Continuous Open Season- Operational Change AGENCY: Federal Acquisition... proposing this operational change to enhance the performance of and modernize the MAS program in three key program areas: Small business viability, operational efficiency, and cost control. The DBM will realign...

  7. 48 CFR 252.232-7011 - Payments in Support of Emergencies and Contingency Operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Emergencies and Contingency Operations. 252.232-7011 Section 252.232-7011 Federal Acquisition Regulations... Emergencies and Contingency Operations. As prescribed in section 232.908, use the following clause: PAYMENTS IN SUPPORT OF EMERGENCIES AND CONTINGENCY OPERATIONS (JUL 2010) (a) Definitions of pertinent terms...

  8. Laser velocimeter data acquisition system for the Langley 14- by 22-foot subsonic tunnel. Software reference guide version 3.3

    NASA Technical Reports Server (NTRS)

    Jumper, Judith K.

    1994-01-01

    The Laser Velocimeter Data Acquisition System (LVDAS) in the Langley 14- by 22-Foot Tunnel is controlled by a comprehensive software package. The software package was designed to control the data acquisition process during wind tunnel tests which employ a laser velocimeter measurement system. This report provides detailed explanations on how to configure and operate the LVDAS system to acquire laser velocimeter and static wind tunnel data.

  9. SSN 774 Virginia Class Submarine (SSN 774)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-516 SSN 774 Virginia Class Submarine (SSN 774) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 8, 2016 11:22:44 UNCLASSIFIED SSN 774 December 2015 SAR March 8, 2016 11:22:44 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost SSN 774 December 2015 SAR March 8

  10. Ground/Air Task Oriented Radar (G/ATOR)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-386 Ground/Air Task Oriented Radar (G/ATOR) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 18, 2016 06:47:59 UNCLASSIFIED G/ATOR December 2015 SAR March 18, 2016 06:47:59 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost G/ATOR December 2015 SAR March 18

  11. Small Diameter Bomb Increment II (SDB II)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-439 Small Diameter Bomb Increment II (SDB II) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 23, 2016 16:19:13 UNCLASSIFIED SDB II December 2015 SAR March 23, 2016 16:19:13 UNCLASSIFIED...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost SDB II December 2015 SAR March 23

  12. Littoral Combat Ship Mission Modules (LCS MM)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-443 Littoral Combat Ship Mission Modules (LCS MM) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 9, 2016 08:50:12 UNCLASSIFIED LCS MM December 2015 SAR March 9, 2016 08:50:12 UNCLASSIFIED...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost LCS MM December 2015 SAR March 9

  13. F-35 Joint Strike Fighter Aircraft (F-35)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-198 F-35 Joint Strike Fighter Aircraft (F-35) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 21, 2016 08:47:09 UNCLASSIFIED F-35 December 2015 SAR March 21, 2016 08:47:09 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost F-35 December 2015 SAR March 21

  14. Air and Missile Defense Radar (AMDR)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-384 Air and Missile Defense Radar (AMDR) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 8, 2016 11:04:34 UNCLASSIFIED AMDR December 2015 SAR March 8, 2016 11:04:34 UNCLASSIFIED 2 Table...OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost AMDR December 2015 SAR March 8, 2016 11:04:34

  15. LHA 6 America Class Amphibious Assault Ship (LHA 6)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-333 LHA 6 America Class Amphibious Assault Ship (LHA 6) As of FY 2017 President’s Budget...Defense Acquisition Management Information Retrieval (DAMIR) March 8, 2016 09:40:04 UNCLASSIFIED LHA 6 December 2015 SAR March 8, 2016 09:40:04...Requirements Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost LHA 6 December 2015 SAR March

  16. Urgent Reform Required: Army Expeditionary Contracting. Report of the Commission on Army Acquisition and Program Management in Expeditionary Operations

    DTIC Science & Technology

    2007-10-01

    Division Dave Mabee , Senior Procurement Analyst, Office of the Deputy Assistant Secretary of the Army, Policy and Procurement Jill Stiglich, Lieutenant...U.S. Army, Commanding General, U.S. Army Materiel Command Grazioplene, James , Vice President, KBR Grover, Jeffrey, Lieutenant Colonel, U.S. Army...Management and Chief Acquisition Officer, FEMA Loehrl, James , Director of the Acquisition Center and PARC, U.S. Army Sustainment Command Urgent Reform

  17. Joint Air-to-Ground Missile (JAGM)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-355 Joint Air-to-Ground Missile (JAGM) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 4, 2016 09:30:05 UNCLASSIFIED JAGM December 2015 SAR March 4, 2016 09:30:05 UNCLASSIFIED 2 Table of...Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost JAGM December 2015 SAR March 4, 2016 09:30:05

  18. The Requirement for Acquisition and Logistics Integration: An Examination of Reliability Management Within the Marine Corps Acquisition Process

    DTIC Science & Technology

    2002-12-01

    HMMWV family of vehicles, LVS family of vehicles, and the M198 Howitzer). The analysis is limited to an assessment of reliability management issues...AND LOGISTICS INTEGRATION: AN EXAMINATION OF RELIABILITY MANAGEMENT WITHIN THE MARINE CORPS ACQUISITION PROCESS by Marvin L. Norcross, Jr...Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction

  19. Rapid Delivery of Cyber Capabilities: Evaluation of the Requirement for a Rapid Cyber Acquisition Process

    DTIC Science & Technology

    2012-06-01

    record (PoR) to give both a quantitative and qualitative perspective on the rapid cyber acquisitions framework . It also investigates if cyber operations...acquisition is a complex topic that does not yet have a solidified framework . To scope this research, a comprehensive review of past, present and...for AT&L is working with the DoD cyberspace community to develop a common framework for Services and Agencies to acquire capabilities for cyberspace

  20. Design and realization of high voltage disconnector condition monitoring system

    NASA Astrophysics Data System (ADS)

    Shi, Jinrui; Xu, Tianyang; Yang, Shuixian; Li, Buoyang

    2017-08-01

    The operation status of the high voltage disconnector directly affects the safe and stable operation of the power system. This article uses the wireless frequency hopping communication technology of the communication module to achieve the temperature acquisition of the switch contacts and high voltage bus, to introduce the current value of the loop in ECS, and judge the operation status of the disconnector by considering the ambient temperature, calculating the temperature rise; And through the acquisition of the current of drive motor in the process of switch closing and opening, and fault diagnosis of the disconnector by analyzing the change rule of the drive motor current, the condition monitoring of the high voltage disconnector is realized.

  1. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1992-01-01

    Archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL's) Office of Telecommunications and Data Acquisition (TDA) are published in the TDA Progress Report. In the search for extraterrestrial intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. In solar system radar, it reports on the uses of the Goldstone Solar System Radar for scientific exploration of the planets, their rings and satellites, asteroids, and comets. In radio astronomy, the areas of support include spectroscopy, very long baseline interferometry, and astrometry. These three programs are performed for NASA's Office of Space Science and Applications (OSSA), with the Office of Space Operations funding DSN operational support.

  2. 48 CFR 552.270-18 - Default in Delivery-Time Extensions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Default in Delivery-Time Extensions. 552.270-18 Section 552.270-18 Federal Acquisition Regulations System GENERAL SERVICES... leases, in excess of the aggregate rent and estimated real estate tax and operating cost adjustments for...

  3. 48 CFR 552.270-18 - Default in Delivery-Time Extensions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Default in Delivery-Time Extensions. 552.270-18 Section 552.270-18 Federal Acquisition Regulations System GENERAL SERVICES... leases, in excess of the aggregate rent and estimated real estate tax and operating cost adjustments for...

  4. 48 CFR 552.270-18 - Default in Delivery-Time Extensions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Default in Delivery-Time Extensions. 552.270-18 Section 552.270-18 Federal Acquisition Regulations System GENERAL SERVICES... leases, in excess of the aggregate rent and estimated real estate tax and operating cost adjustments for...

  5. 48 CFR 552.270-18 - Default in Delivery-Time Extensions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Default in Delivery-Time Extensions. 552.270-18 Section 552.270-18 Federal Acquisition Regulations System GENERAL SERVICES... leases, in excess of the aggregate rent and estimated real estate tax and operating cost adjustments for...

  6. 48 CFR 945.570-8 - Reporting motor vehicle data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Reporting motor vehicle... Reporting motor vehicle data. (a) Contractors conducting motor vehicle operations shall forward annually (on or before December 1) to the contracting officer their plan for acquisition of motor vehicles for the...

  7. 75 FR 11224 - Albany & Eastern Railroad Company-Acquisition and Operation Exemption-Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35355] Albany... notice of exemption in STB Finance Docket No. 35353, VFRC, LLC--Acquisition Exemption--Union Pacific... proposed transaction does not contain any provision or involve any agreement that would limit its future...

  8. 77 FR 74382 - Acquisition Regulation: Department of Energy Acquisition Regulation, Government Property

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... ``; dollar threshold for capital equipment is as established by the DOE Financial Management Handbook.'' 22... equipment is as established by the DOE Financial Management Handbook. Personal property, as used in this..., 952, Solicitation Provisions and Contract Clauses, and 970, Management and Operating Contracts, to...

  9. 48 CFR 2813.305 - Imprest funds and third party drafts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Imprest funds and third party drafts. 2813.305 Section 2813.305 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE....305 Imprest funds and third party drafts. Regulations governing the operation and procedures of the...

  10. 48 CFR 2813.305 - Imprest funds and third party drafts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Imprest funds and third party drafts. 2813.305 Section 2813.305 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE....305 Imprest funds and third party drafts. Regulations governing the operation and procedures of the...

  11. 48 CFR 2813.305 - Imprest funds and third party drafts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Imprest funds and third party drafts. 2813.305 Section 2813.305 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE....305 Imprest funds and third party drafts. Regulations governing the operation and procedures of the...

  12. 48 CFR 2813.305 - Imprest funds and third party drafts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Imprest funds and third party drafts. 2813.305 Section 2813.305 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE....305 Imprest funds and third party drafts. Regulations governing the operation and procedures of the...

  13. 48 CFR 2813.305 - Imprest funds and third party drafts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Imprest funds and third party drafts. 2813.305 Section 2813.305 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE....305 Imprest funds and third party drafts. Regulations governing the operation and procedures of the...

  14. Acquisition and cruise sensing for attitude control

    NASA Technical Reports Server (NTRS)

    Pace, G. D., Jr.; Schmidt, L. F.

    1977-01-01

    Modified wideangle analog cruise sun sensor coupled with changes in optic attitude correction capabilities, eliminate need of acquisition and sun gate sensors, making on-course navigation of spacecraft flying interplanetary missions less risky and costly. Operational characteristics potentially make system applicable to guidance and control of solar energy collection systems.

  15. 48 CFR 225.7703-1 - Acquisition procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operations in Iraq or Afghanistan 225.7703-1 Acquisition procedures. (a) Subject to the requirements of 225... in Iraq or Afghanistan, may be acquired by— (1) Providing a preference for products or services from Iraq or Afghanistan in accordance with the evaluation procedures at 225.7703-3; (2) Limiting...

  16. Pragmatic User Model Implementation in an Intelligent Help System.

    ERIC Educational Resources Information Center

    Fernandez-Manjon, Baltasar; Fernandez-Valmayor, Alfredo; Fernandez-Chamizo, Carmen

    1998-01-01

    Describes Aran, a knowledge-based system designed to help users deal with problems related to Unix operation. Highlights include adaptation to the individual user; user modeling knowledge; stereotypes; content of the individual user model; instantiation, acquisition, and maintenance of the individual model; dynamic acquisition of objective and…

  17. 40 CFR 35.940-3 - Costs allowable, if approved.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the treatment process, or that will be used for ultimate disposal of residues resulting from such... of compost residues which result from wastewater treatment, if EPA has approved a program for use of the compost. (d) Acquisition of an operable portion of a treatment works. This type of acquisition is...

  18. 40 CFR 35.940-3 - Costs allowable, if approved.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the treatment process, or that will be used for ultimate disposal of residues resulting from such... of compost residues which result from wastewater treatment, if EPA has approved a program for use of the compost. (d) Acquisition of an operable portion of a treatment works. This type of acquisition is...

  19. 40 CFR 35.940-3 - Costs allowable, if approved.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the treatment process, or that will be used for ultimate disposal of residues resulting from such... of compost residues which result from wastewater treatment, if EPA has approved a program for use of the compost. (d) Acquisition of an operable portion of a treatment works. This type of acquisition is...

  20. 48 CFR 225.1101 - Acquisition of supplies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., when the acquisition is of end products listed in 225.401-70 in support of operations in Afghanistan...; (B) All line items must be domestic or qualifying country end products in accordance with Subpart 225.70. (However, the clause may still be required if Subpart 225.70 requires manufacture of the end...

  1. 48 CFR 225.1101 - Acquisition of supplies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., when the acquisition is of end products listed in 225.401-70 in support of operations in Afghanistan...; (B) All line items must be domestic or qualifying country end products in accordance with Subpart 225.70. (However, the clause may still be required if Subpart 225.70 requires manufacture of the end...

  2. 75 FR 18253 - R.J. Corman Railroad Property, LLC-Acquisition Exemption-NC Railroad, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35363] R.J. Corman Railroad Property, LLC--Acquisition Exemption--NC Railroad, Inc. R.J. Corman Railroad Property... exemption in STB Finance Docket No. 35364, R.J. Corman Railroad Company/Bardstown Line--Lease and Operation...

  3. 48 CFR 252.239-7001 - Information Assurance Contractor Training and Certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... level as listed in the current version of DoD 8570.01-M; and (2) Appropriate operating system... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Information Assurance... System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  4. 48 CFR 252.239-7001 - Information Assurance Contractor Training and Certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... level as listed in the current version of DoD 8570.01-M; and (2) Appropriate operating system... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Information Assurance... System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  5. 48 CFR 252.239-7001 - Information Assurance Contractor Training and Certification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... level as listed in the current version of DoD 8570.01-M; and (2) Appropriate operating system... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Information Assurance... System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  6. 48 CFR 252.239-7001 - Information Assurance Contractor Training and Certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... level as listed in the current version of DoD 8570.01-M; and (2) Appropriate operating system... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Information Assurance... System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  7. 48 CFR 252.239-7001 - Information Assurance Contractor Training and Certification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... level as listed in the current version of DoD 8570.01-M; and (2) Appropriate operating system... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Information Assurance... System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  8. Commonality in Military Equipment. A Framework to Improve Acquisition Decisions

    DTIC Science & Technology

    2008-01-01

    Improving Acquisition Decisions Chopra, Sunil , and Peter Meindl, Supply Chain Management : Strategy, Planning, Operation, Upper Saddle River, N.J...Personnel Costs in Managing Suppliers and Ordering Parts. The effort to perform these activities may be reduced and simplified through a smaller supply ...a Combined MOS on Mechanic Supply Variability

  9. 48 CFR 552.270-18 - Default in Delivery-Time Extensions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Default in Delivery-Time Extensions. 552.270-18 Section 552.270-18 Federal Acquisition Regulations System GENERAL SERVICES... leases, in excess of the aggregate rent and estimated real estate tax and operating cost adjustments for...

  10. 75 FR 68217 - Acquisition Regulation: Agency Supplementary Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... amending the Department of Energy Acquisition Regulation (DEAR) on DOE Management and Operating Contracts..., and update references. Today's rule does not alter substantive rights or obligations under current law... Contracts to conform it to the FAR. None of today's changes are substantive or of a nature to cause any...

  11. 48 CFR 1.102 - Statement of guiding principles for the Federal Acquisition System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... customer, while maintaining the public's trust and fulfilling public policy objectives. Participants in the... of responsibility. (b) The Federal Acquisition System will— (1) Satisfy the customer in terms of cost...) Minimize administrative operating costs; (3) Conduct business with integrity, fairness, and openness; and...

  12. Implicit Trust in a Data Model

    DTIC Science & Technology

    2011-10-01

    model, interfacing will be easier 8. This aspect is usually not a concern for operators. 8. Interfacing can account for between 25-70% of the cost of...32 6.7.3 Flexibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 6.7.4 Cost of Knowledge Acquisition...51 8.5.4 Cost of Knowledge Acquisition . . . . . . . . . . . . . . . . . . 52 8.6 Reputation

  13. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network (DSN) in space communications, radio navigation, radio science, and ground-based radio astronomy are reported. Also included are the plans, supporting research and technology, implementation and operations for the Ground Communications Facility (GCF). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the search for extraterrestrial intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum.

  14. The DZERO Level 3 Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Angstadt, R.; Brooijmans, G.; Chapin, D.; Clements, M.; Cutts, D.; Haas, A.; Hauser, R.; Johnson, M.; Kulyavtsev, A.; Mattingly, S. E. K.; Mulders, M.; Padley, P.; Petravick, D.; Rechenmacher, R.; Snyder, S.; Watts, G.

    2004-06-01

    The DZERO experiment began RunII datataking operation at Fermilab in spring 2001. The physics program of the experiment requires the Level 3 data acquisition (DAQ) system system to handle average event sizes of 250 kilobytes at a rate of 1 kHz. The system routes and transfers event fragments of approximately 1-20 kilobytes from 63 VME crate sources to any of approximately 100 processing nodes. It is built upon a Cisco 6509 Ethernet switch, standard PCs, and commodity VME single board computers (SBCs). The system has been in full operation since spring 2002.

  15. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, Edward C. (Editor)

    1991-01-01

    A compilation is presented of articles on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition. In space communications, radio navigation, radio science, and ground based radio and radar astronomy, activities of the Deep Space Network are reported in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), implementation and operations are reported for searching the microwave spectrum.

  16. A graphics subsystem retrofit design for the bladed-disk data acquisition system. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Carney, R. R.

    1983-01-01

    A graphics subsystem retrofit design for the turbojet blade vibration data acquisition system is presented. The graphics subsystem will operate in two modes permitting the system operator to view blade vibrations on an oscilloscope type of display. The first mode is a real-time mode that displays only gross blade characteristics, such as maximum deflections and standing waves. This mode is used to aid the operator in determining when to collect detailed blade vibration data. The second mode of operation is a post-processing mode that will animate the actual blade vibrations using the detailed data collected on an earlier data collection run. The operator can vary the rate of payback to view differring characteristics of blade vibrations. The heart of the graphics subsystem is a modified version of AMD's ""super sixteen'' computer, called the graphics preprocessor computer (GPC). This computer is based on AMD's 2900 series of bit-slice components.

  17. Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Bosch, H.-S.; Wolf, R. C.; Andreeva, T.; Baldzuhn, J.; Birus, D.; Bluhm, T.; Bräuer, T.; Braune, H.; Bykov, V.; Cardella, A.; Durodié, F.; Endler, M.; Erckmann, V.; Gantenbein, G.; Hartmann, D.; Hathiramani, D.; Heimann, P.; Heinemann, B.; Hennig, C.; Hirsch, M.; Holtum, D.; Jagielski, J.; Jelonnek, J.; Kasparek, W.; Klinger, T.; König, R.; Kornejew, P.; Kroiss, H.; Krom, J. G.; Kühner, G.; Laqua, H.; Laqua, H. P.; Lechte, C.; Lewerentz, M.; Maier, J.; McNeely, P.; Messiaen, A.; Michel, G.; Ongena, J.; Peacock, A.; Pedersen, T. S.; Riedl, R.; Riemann, H.; Rong, P.; Rust, N.; Schacht, J.; Schauer, F.; Schroeder, R.; Schweer, B.; Spring, A.; Stäbler, A.; Thumm, M.; Turkin, Y.; Wegener, L.; Werner, A.; Zhang, D.; Zilker, M.; Akijama, T.; Alzbutas, R.; Ascasibar, E.; Balden, M.; Banduch, M.; Baylard, Ch.; Behr, W.; Beidler, C.; Benndorf, A.; Bergmann, T.; Biedermann, C.; Bieg, B.; Biel, W.; Borchardt, M.; Borowitz, G.; Borsuk, V.; Bozhenkov, S.; Brakel, R.; Brand, H.; Brown, T.; Brucker, B.; Burhenn, R.; Buscher, K.-P.; Caldwell-Nichols, C.; Cappa, A.; Cardella, A.; Carls, A.; Carvalho, P.; Ciupiński, Ł.; Cole, M.; Collienne, J.; Czarnecka, A.; Czymek, G.; Dammertz, G.; Dhard, C. P.; Davydenko, V. I.; Dinklage, A.; Drevlak, M.; Drotziger, S.; Dudek, A.; Dumortier, P.; Dundulis, G.; Eeten, P. v.; Egorov, K.; Estrada, T.; Faugel, H.; Fellinger, J.; Feng, Y.; Fernandes, H.; Fietz, W. H.; Figacz, W.; Fischer, F.; Fontdecaba, J.; Freund, A.; Funaba, T.; Fünfgelder, H.; Galkowski, A.; Gates, D.; Giannone, L.; García Regaña, J. M.; Geiger, J.; Geißler, S.; Greuner, H.; Grahl, M.; Groß, S.; Grosman, A.; Grote, H.; Grulke, O.; Haas, M.; Haiduk, L.; Hartfuß, H.-J.; Harris, J. H.; Haus, D.; Hein, B.; Heitzenroeder, P.; Helander, P.; Heller, R.; Hidalgo, C.; Hildebrandt, D.; Höhnle, H.; Holtz, A.; Holzhauer, E.; Holzthüm, R.; Huber, A.; Hunger, H.; Hurd, F.; Ihrke, M.; Illy, S.; Ivanov, A.; Jablonski, S.; Jaksic, N.; Jakubowski, M.; Jaspers, R.; Jensen, H.; Jenzsch, H.; Kacmarczyk, J.; Kaliatk, T.; Kallmeyer, J.; Kamionka, U.; Karaleviciu, R.; Kern, S.; Keunecke, M.; Kleiber, R.; Knauer, J.; Koch, R.; Kocsis, G.; Könies, A.; Köppen, M.; Koslowski, R.; Koshurinov, J.; Krämer-Flecken, A.; Krampitz, R.; Kravtsov, Y.; Krychowiak, M.; Krzesinski, G.; Ksiazek, I.; Kubkowska, M.; Kus, A.; Langish, S.; Laube, R.; Laux, M.; Lazerson, S.; Lennartz, M.; Li, C.; Lietzow, R.; Lohs, A.; Lorenz, A.; Louche, F.; Lubyako, L.; Lumsdaine, A.; Lyssoivan, A.; Maaßberg, H.; Marek, P.; Martens, C.; Marushchenko, N.; Mayer, M.; Mendelevitch, B.; Mertens, Ph.; Mikkelsen, D.; Mishchenko, A.; Missal, B.; Mizuuchi, T.; Modrow, H.; Mönnich, T.; Morizaki, T.; Murakami, S.; Musielok, F.; Nagel, M.; Naujoks, D.; Neilson, H.; Neubauer, O.; Neuner, U.; Nocentini, R.; Noterdaeme, J.-M.; Nührenberg, C.; Obermayer, S.; Offermanns, G.; Oosterbeek, H.; Otte, M.; Panin, A.; Pap, M.; Paquay, S.; Pasch, E.; Peng, X.; Petrov, S.; Pilopp, D.; Pirsch, H.; Plaum, B.; Pompon, F.; Povilaitis, M.; Preinhaelter, J.; Prinz, O.; Purps, F.; Rajna, T.; Récsei, S.; Reiman, A.; Reiter, D.; Remmel, J.; Renard, S.; Rhode, V.; Riemann, J.; Rimkevicius, S.; Riße, K.; Rodatos, A.; Rodin, I.; Romé, M.; Roscher, H.-J.; Rummel, K.; Rummel, Th.; Runov, A.; Ryc, L.; Sachtleben, J.; Samartsev, A.; Sanchez, M.; Sano, F.; Scarabosio, A.; Schmid, M.; Schmitz, H.; Schmitz, O.; Schneider, M.; Schneider, W.; Scheibl, L.; Scholz, M.; Schröder, G.; Schröder, M.; Schruff, J.; Schumacher, H.; Shikhovtsev, I. V.; Shoji, M.; Siegl, G.; Skodzik, J.; Smirnow, M.; Speth, E.; Spong, D. A.; Stadler, R.; Sulek, Z.; Szabó, V.; Szabolics, T.; Szetefi, T.; Szökefalvi-Nagy, Z.; Tereshchenko, A.; Thomsen, H.; Thumm, M.; Timmermann, D.; Tittes, H.; Toi, K.; Tournianski, M.; Toussaint, U. v.; Tretter, J.; Tulipán, S.; Turba, P.; Uhlemann, R.; Urban, J.; Urbonavicius, E.; Urlings, P.; Valet, S.; Van Eester, D.; Van Schoor, M.; Vervier, M.; Viebke, H.; Vilbrandt, R.; Vrancken, M.; Wauters, T.; Weissgerber, M.; Weiß, E.; Weller, A.; Wendorf, J.; Wenzel, U.; Windisch, T.; Winkler, E.; Winkler, M.; Wolowski, J.; Wolters, J.; Wrochna, G.; Xanthopoulos, P.; Yamada, H.; Yokoyama, M.; Zacharias, D.; Zajac, J.; Zangl, G.; Zarnstorff, M.; Zeplien, H.; Zoletnik, S.; Zuin, M.

    2013-12-01

    The next step in the Wendelstein stellarator line is the large superconducting device Wendelstein 7-X, currently under construction in Greifswald, Germany. Steady-state operation is an intrinsic feature of stellarators, and one key element of the Wendelstein 7-X mission is to demonstrate steady-state operation under plasma conditions relevant for a fusion power plant. Steady-state operation of a fusion device, on the one hand, requires the implementation of special technologies, giving rise to technical challenges during the design, fabrication and assembly of such a device. On the other hand, also the physics development of steady-state operation at high plasma performance poses a challenge and careful preparation. The electron cyclotron resonance heating system, diagnostics, experiment control and data acquisition are prepared for plasma operation lasting 30 min. This requires many new technological approaches for plasma heating and diagnostics as well as new concepts for experiment control and data acquisition.

  18. A Low-Cost Data Acquisition System for Automobile Dynamics Applications

    PubMed Central

    González, Alejandro; Vinolas, Jordi

    2018-01-01

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources. PMID:29382039

  19. A Low-Cost Data Acquisition System for Automobile Dynamics Applications.

    PubMed

    González, Alejandro; Olazagoitia, José Luis; Vinolas, Jordi

    2018-01-27

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources.

  20. 10 CFR 490.306 - Vehicle operation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle operation requirements. 490.306 Section 490.306 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled...

  1. 10 CFR 490.306 - Vehicle operation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Vehicle operation requirements. 490.306 Section 490.306 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled...

  2. 10 CFR 490.306 - Vehicle operation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Vehicle operation requirements. 490.306 Section 490.306 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled...

  3. 10 CFR 490.306 - Vehicle operation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Vehicle operation requirements. 490.306 Section 490.306 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled...

  4. 10 CFR 490.306 - Vehicle operation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Vehicle operation requirements. 490.306 Section 490.306 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled...

  5. Acquisition of Formal Operations: The Effects of Two Training Procedures.

    ERIC Educational Resources Information Center

    Rosenthal, Doreen A.

    1979-01-01

    A study of 11- and 12-year-old girls indicates that either of two training procedures, method training or dimension training, can aid in the transition from concrete operational to formal operational thought by promoting a hypothesis-testing attitude. (BH)

  6. On the reproducibility of expert-operated and robotic ultrasound acquisitions.

    PubMed

    Kojcev, Risto; Khakzar, Ashkan; Fuerst, Bernhard; Zettinig, Oliver; Fahkry, Carole; DeJong, Robert; Richmon, Jeremy; Taylor, Russell; Sinibaldi, Edoardo; Navab, Nassir

    2017-06-01

    We present the evaluation of the reproducibility of measurements performed using robotic ultrasound imaging in comparison with expert-operated sonography. Robotic imaging for interventional procedures may be a valuable contribution, but requires reproducibility for its acceptance in clinical routine. We study this by comparing repeated measurements based on robotic and expert-operated ultrasound imaging. Robotic ultrasound acquisition is performed in three steps under user guidance: First, the patient is observed using a 3D camera on the robot end effector, and the user selects the region of interest. This allows for automatic planning of the robot trajectory. Next, the robot executes a sweeping motion following the planned trajectory, during which the ultrasound images and tracking data are recorded. As the robot is compliant, deviations from the path are possible, for instance due to patient motion. Finally, the ultrasound slices are compounded to create a volume. Repeated acquisitions can be performed automatically by comparing the previous and current patient surface. After repeated image acquisitions, the measurements based on acquisitions performed by the robotic system and expert are compared. Within our case series, the expert measured the anterior-posterior, longitudinal, transversal lengths of both of the left and right thyroid lobes on each of the 4 healthy volunteers 3 times, providing 72 measurements. Subsequently, the same procedure was performed using the robotic system resulting in a cumulative total of 144 clinically relevant measurements. Our results clearly indicated that robotic ultrasound enables more repeatable measurements. A robotic ultrasound platform leads to more reproducible data, which is of crucial importance for planning and executing interventions.

  7. An agile acquisition decision-support workbench for evaluating ISR effectiveness

    NASA Astrophysics Data System (ADS)

    Stouch, Daniel W.; Champagne, Valerie; Mow, Christopher; Rosenberg, Brad; Serrin, Joshua

    2011-06-01

    The U.S. Air Force is consistently evolving to support current and future operations through the planning and execution of intelligence, surveillance and reconnaissance (ISR) missions. However, it is a challenge to maintain a precise awareness of current and emerging ISR capabilities to properly prepare for future conflicts. We present a decisionsupport tool for acquisition managers to empirically compare ISR capabilities and approaches to employing them, thereby enabling the DoD to acquire ISR platforms and sensors that provide the greatest return on investment. We have developed an analysis environment to perform modeling and simulation-based experiments to objectively compare alternatives. First, the analyst specifies an operational scenario for an area of operations by providing terrain and threat information; a set of nominated collections; sensor and platform capabilities; and processing, exploitation, and dissemination (PED) capacities. Next, the analyst selects and configures ISR collection strategies to generate collection plans. The analyst then defines customizable measures of effectiveness or performance to compute during the experiment. Finally, the analyst empirically compares the efficacy of each solution and generates concise reports to document their conclusions, providing traceable evidence for acquisition decisions. Our capability demonstrates the utility of using a workbench environment for analysts to design and run experiments. Crafting impartial metrics enables the acquisition manager to focus on evaluating solutions based on specific military needs. Finally, the metric and collection plan visualizations provide an intuitive understanding of the suitability of particular solutions. This facilitates a more agile acquisition strategy that handles rapidly changing technology in response to current military needs.

  8. Syphilis

    MedlinePlus

    ... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...

  9. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  10. Army Acquisition and Contracting Personnel Requirements: How are the Army’s Current Recruitment, Development and Retention Programs Meeting Current and Future Personnel Requirements?

    DTIC Science & Technology

    2011-09-01

    Contracting Center SEEP Student Educational Employment Program SAP Simplified Acquisition Procedures SDDC Surface Deployment and Distribution...personnel is more decentralized in DoD than it is for the uniformed military, and civilian employment levels are more driven by operating budgets...private sector recruiting efforts and make it easier to apply for DoD acquisition positions 26 5. Maximize use of the Student Educational Employment

  11. Budget Uncertainty and Business Management Reform in the Department of Defense: Some Considerations for Acquisition Management

    DTIC Science & Technology

    2007-04-30

    top-line. While this would seem to be good news for the acquisition community, recent increases in the defense top-line, largely related to the war...Lopez, T. C. (2005). Smart operations office formed at pentagon. Air Force Print News , 11 May 2005. McCarthy, J. D. (2006). The case for ...A. Brook, PhD, Director, Center for Defense Management Reform, Naval Postgraduate School 4th Annual Acquisition Research Symposium of the Naval

  12. KC-46A Tanker Modernization (KC-46A)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-387 KC-46A Tanker Modernization (KC-46A) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 22, 2016 16:45:38 UNCLASSIFIED KC-46A December 2015 SAR March 22, 2016 16:45:38 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost KC-46A December 2015 SAR March 22

  13. C-130J Hercules Transport Aircraft (C-130J)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-220 C-130J Hercules Transport Aircraft (C-130J) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 21, 2016 11:33:03 UNCLASSIFIED C-130J December 2015 SAR March 21, 2016 11:33:03...Requirements Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost C-130J December 2015 SAR March 21

  14. KC-130J Transport Aircraft (KC-130J)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-433 KC-130J Transport Aircraft (KC-130J) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) March 23, 2016 15:23:28 UNCLASSIFIED KC-130J December 2015 SAR March 23, 2016 15:23:28 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost KC-130J December 2015 SAR March 23

  15. Proceedings of the Annual Acquisition Research Symposium (7th), Acquisition Research: Creating Synergy for Informed Change 12-13 May 2010. Volume 2

    DTIC Science & Technology

    2010-04-30

    delivered enhances both the teaching and learning processes. • The number of students engaged in focused acquisition research for their MBA projects...Meyers, US Navy—Lieutenant Nicholas Meyers is an MBA student in the Graduate School of Business & Public Policy at the Naval Postgraduate School . LT...Theoretic Computer Science Mathematics and Operations Research Werner Heisenberg-Weg 39 85577 Neubiberg, Germany Phone +49 89 6004 2400 Abstract

  16. Lacie phase 1 Classification and Mensuration Subsystem (CAMS) rework experiment

    NASA Technical Reports Server (NTRS)

    Chhikara, R. S.; Hsu, E. M.; Liszcz, C. J.

    1976-01-01

    An experiment was designed to test the ability of the Classification and Mensuration Subsystem rework operations to improve wheat proportion estimates for segments that had been processed previously. Sites selected for the experiment included three in Kansas and three in Texas, with the remaining five distributed in Montana and North and South Dakota. The acquisition dates were selected to be representative of imagery available in actual operations. No more than one acquisition per biophase were used, and biophases were determined by actual crop calendars. All sites were worked by each of four Analyst-Interpreter/Data Processing Analyst Teams who reviewed the initial processing of each segment and accepted or reworked it for an estimate of the proportion of small grains in the segment. Classification results, acquisitions and classification errors and performance results between CAMS regular and ITS rework are tabulated.

  17. 48 CFR 1252.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... work at operating airports. 1252.236-70 Section 1252.236-70 Federal Acquisition Regulations System... Provisions and Clauses 1252.236-70 Special precautions for work at operating airports. As prescribed in (TAR) 48 CFR 1236.570, insert the following clause: Special Precautions for Work at Operating Airports (OCT...

  18. 48 CFR 1252.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... work at operating airports. 1252.236-70 Section 1252.236-70 Federal Acquisition Regulations System... Provisions and Clauses 1252.236-70 Special precautions for work at operating airports. As prescribed in (TAR) 48 CFR 1236.570, insert the following clause: Special Precautions for Work at Operating Airports (OCT...

  19. 48 CFR 1252.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... work at operating airports. 1252.236-70 Section 1252.236-70 Federal Acquisition Regulations System... Provisions and Clauses 1252.236-70 Special precautions for work at operating airports. As prescribed in (TAR) 48 CFR 1236.570, insert the following clause: Special Precautions for Work at Operating Airports (OCT...

  20. 48 CFR 3052.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... work at operating airports. 3052.236-70 Section 3052.236-70 Federal Acquisition Regulations System... work at operating airports. As prescribed in (HSAR) 48 CFR 3036.570, insert the following clause: Special Precautions for Work at Operating Airports (DEC 2003) (a) When work is to be performed at an...

Top