11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Engine Research Building’s Central Control Room
1948-07-21
Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.
51. VIEW OF LORAL ADS 100A COMPUTERS LOCATED CENTRALLY ON ...
51. VIEW OF LORAL ADS 100A COMPUTERS LOCATED CENTRALLY ON NORTH WALL OF TELEMETRY ROOM (ROOM 106). SLC-3W CONTROL ROOM IS VISIBLE IN BACKGROUND THROUGH WINDOW IN NORTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Central Control Room in the Engine Research Building
1968-11-21
Operators in the Engine Research Building’s Central Control Room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. The panels on the wall contain schematics with indicator lights and instrumentation for the atmospheric exhaust, altitude exhaust, refrigerated air, and process air systems. The process air equipment included twelve exhausters, four compressors, refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE ...
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC3W ...
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING USAF LAUNCH CONTROLLER AND ASSISTANT USAF LAUNCH CONTROLLER PANELS. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
[Plug-in Based Centralized Control System in Operating Rooms].
Wang, Yunlong
2017-05-30
Centralized equipment controls in an operating room (OR) is crucial to an efficient workflow in the OR. To achieve centralized control, an integrative OR needs to focus on designing a control panel that can appropriately incorporate equipment from different manufactures with various connecting ports and controls. Here we propose to achieve equipment integration using plug-in modules. Each OR will be equipped with a dynamic plug-in control panel containing physically removable connecting ports. Matching outlets will be installed onto the control panels of each equipment used at any given time. This dynamic control panel will be backed with a database containing plug-in modules that can connect any two types of connecting ports common among medical equipment manufacturers. The correct connecting ports will be called using reflection dynamics. This database will be updated regularly to include new connecting ports on the market, making it easy to maintain, update, expand and remain relevant as new equipment are developed. Together, the physical panel and the database will achieve centralized equipment controls in the OR that can be easily adapted to any equipment in the OR.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-25
... are placed on the Entity List on the basis of certain sections of part 744 (Control Policy: End-User... (1) Biznest, LTD, Room 927 9/F Far East Consortium Building, 121 Des Voeux Road C, Central District, Hong Kong; and (2) Yeraz, LTD, Room 927 9/F Far East Consortium Building, 121 Des Voeux Road C, Central...
1979-08-01
management and under overall supervicion of a supervisour nurse (08-9) in charge of CSR . Individual will have operational responsibility for CSR ...mD~ ; EL ::%~ rl- CgROCOPV RESOtUTIOI TEST CMMR NAUT ON AM OF SrAsfas-ua4 I C41 0 A STUDY OF CENTRAL STERILIZATION ROOM ( CSR )a CONTROL...MUEtsrbt niie PERORIN ONIATIO C OD IS. U3JECT TR S. MNITOIN ORAIZTO REPORT NUMBER S) inres NAEmpai On theORIN organisatioN an managemen ofC theBO CSR
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN ...
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING BLANK PANEL AND COMPLEX SAFETY OFFICER PANEL. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Maximum performance synergy: A new approach to recording studio control room design
NASA Astrophysics Data System (ADS)
Szymanski, Jeff D.
2003-10-01
Popular recording studio control room designs include LEDE(tm), RFZ(tm), and nonenvironment rooms. The common goal of all of these is to create an accurate acoustical environment that does not distort or otherwise color audio reproduction. Also common to these designs is the frequent need to have multiple ancillary recording rooms, often adjacent to the main control room, where group members perform. This approach, where group members are physically separated from one another, can lead to lack of ensemble in the finished recordings. New twists on old acoustical treatment techniques have been implemented at a studio in Nashville, Tennessee, which minimize the need for multiple ancillary recording rooms, thus creating an environment where talent, producer and recording professionals can all occupy the same space for maximum performance synergy. Semi-separated performance areas are designed around a central, critical listening area. The techniques and equipment required to achieve this separation are reviewed, as are advantages and disadvantages to this new control room design approach.
Innovative Designs for the Smart ICU.
Halpern, Neil A
2014-03-01
Successfully designing a new ICU requires clarity of vision and purpose and the recognition that the patient room is the core of the ICU experience for patients, staff, and visitors. The ICU can be conceptualized into three components: the patient room, central areas, and universal support services. Each patient room should be designed for single patient use and be similarly configured and equipped. The design of the room should focus upon functionality, ease of use, healing, safety, infection control, communications, and connectivity. All aspects of the room, including its infrastructure; zones for work, care, and visiting; environment, medical devices, and approaches to privacy; logistics; and waste management, are important elements in the design process. Since most medical devices used at the ICU bedside are really sophisticated computers, the ICU needs to be capable of supporting the full scope of medical informatics. The patient rooms, the central ICU areas (central stations, corridors, supply rooms, pharmacy, laboratory, staff lounge, visitor waiting room, on-call suite, conference rooms, and offices), and the universal support services (infection prevention, finishings and flooring, staff communications, signage and wayfinding, security, and fire and safety) work best when fully interwoven. This coordination helps establish efficient and safe patient throughput and care and fosters physical and social cohesiveness within the ICU. A balanced approach to centralized and decentralized monitoring and logistics also offers great flexibility. Synchronization of the universal support services in the ICU with the hospital's existing systems maintains unity of purpose and continuity across the enterprise and avoids unnecessary duplication of efforts. Copyright © 2014 The American College of Chest Physicians. Published by Elsevier Inc. All rights reserved.
Mental workload measurement in operator control room using NASA-TLX
NASA Astrophysics Data System (ADS)
Sugarindra, M.; Suryoputro, M. R.; Permana, A. I.
2017-12-01
The workload, encountered a combination of physical workload and mental workload, is a consequence of the activities for workers. Central control room is one department in the oil processing company, employees tasked with monitoring the processing unit for 24 hours nonstop with a combination of 3 shifts in 8 hours. NASA-TLX (NASA Task Load Index) is one of the subjective mental workload measurement using six factors, namely the Mental demand (MD), Physical demand (PD), Temporal demand (TD), Performance (OP), Effort (EF), frustration levels (FR). Measurement of a subjective mental workload most widely used because it has a high degree of validity. Based on the calculation of the mental workload, there at 5 units (DTU, NPU, HTU, DIST and OPS) at the control chamber (94; 83.33; 94.67; 81, 33 and 94.67 respectively) that categorize as very high mental workload. The high level of mental workload on the operator in the Central Control Room is a requirement to have high accuracy, alertness and can make decisions quickly
9. View southeast corner of perimeter acquisition radar power plant ...
9. View southeast corner of perimeter acquisition radar power plant room #214, control room; showing central monitoring station console in foreground. Well and booster control panel in left background and electric power management panel on far right - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Power Plant, In Limited Access Area, Southwest of PARB at end of Service Road B, Nekoma, Cavalier County, ND
2009-09-25
CAPE CANAVERAL, Fla. – This ribbon cutting officially turns over NASA Kennedy Space Center's Launch Control Center Firing Room 1 from the Space Shuttle Program to the Constellation Program. Participating are (from left) Pepper Phillips, director of the Constellation Project Office at Kennedy; Bob Cabana, Kennedy's director; Robert Crippen, former astronaut; Jeff Hanley, manager of the Constellation Program at NASA's Johnson Space Center; and Nancy Bray, deputy director of Center Operations at Kennedy. The room has undergone demolition and construction and been outfitted with consoles for the upcoming Ares I-X rocket flight test targeted for launch on Oct. 27. As the center of launch operations at Kennedy since the Apollo Program, the Launch Control Center, or LCC, has played a central role in NASA's human spaceflight programs. Firing Room 1 was the first operational firing room constructed. From this room, controllers launched the first Saturn V, the first crewed flight of Saturn V, the first crewed mission to the moon and the first space shuttle. Firing Room 1 will continue this tradition of firsts when controllers launch the Constellation Program's first flight test. Also, this firing room will be the center of operations for the upcoming Ares I and Orion operations. Photo credit: NASA/Kim Shiflett
[Comprehensive system integration and networking in operating rooms].
Feußner, H; Ostler, D; Kohn, N; Vogel, T; Wilhelm, D; Koller, S; Kranzfelder, M
2016-12-01
A comprehensive surveillance and control system integrating all devices and functions is a precondition for realization of the operating room of the future. Multiple proprietary integrated operation room systems are currently available with a central user interface; however, they only cover a relatively small part of all functionalities. Internationally, there are at least three different initiatives to promote a comprehensive systems integration and networking in the operating room: the Japanese smart cyber operating theater (SCOT), the American medical device plug-and-play interoperability program (MDPnP) and the German secure and dynamic networking in operating room and hospital (OR.NET) project supported by the Federal Ministry of Education and Research. Within the framework of the internationally advanced OR.NET project, prototype solution approaches were realized, which make short-term and mid-term comprehensive data retrieval systems probable. An active and even autonomous control of the medical devices by the surveillance and control system (closed loop) is expected only in the long run due to strict regulatory barriers.
Operating room integration and telehealth.
Bucholz, Richard D; Laycock, Keith A; McDurmont, Leslie
2011-01-01
The increasing use of advanced automated and computer-controlled systems and devices in surgical procedures has resulted in problems arising from the crowding of the operating room with equipment and the incompatible control and communication standards associated with each system. This lack of compatibility between systems and centralized control means that the surgeon is frequently required to interact with multiple computer interfaces in order to obtain updates and exert control over the various devices at his disposal. To reduce this complexity and provide the surgeon with more complete and precise control of the operating room systems, a unified interface and communication network has been developed. In addition to improving efficiency, this network also allows the surgeon to grant remote access to consultants and observers at other institutions, enabling experts to participate in the procedure without having to travel to the site.
21 CFR 814.104 - Original applications.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the Center for Biologics Evaluation and Research, send this information to the Document Control Center... and Research, send this information to the Central Document Control Room, Center for Drug Evaluation... device under an approved IDE) is available to treat or diagnose the disease or condition. The application...
1. VIEW OF THE CONTROL ROOM FOR THE XY RETRIEVER. ...
1. VIEW OF THE CONTROL ROOM FOR THE X-Y RETRIEVER. USING THE X-Y RETRIEVER, OPERATORS RETRIEVED PLUTONIUM METAL FROM THE PLUTONIUM STORAGE VAULTS (IN MODULE K) AND CONVEYED IT TO THE X-Y SHUTTLE AREA WHERE IT WAS CUT AND WEIGHED. FROM THE SHUTTLE AREA THE PLUTONIUM WAS CONVEYED TO MODULES A, J OR K FOR CASTING, OR MODULE B FOR ROLLING AND FORMING. (5/17/71) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO
Control Room at the NACA’s Rocket Engine Test Facility
1957-05-21
Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.
[Effects of different oxygen inhalation modes on retinal vessels development in neonatal mice].
Wang, Yu-Huan; Chen, Chao; Shi, Wen-Jing; Xiao, Hong-Lei; Tong, Bei-Yan; Zhou, Guo-Min
2006-04-01
This study was designed to investigate the effects of different oxygen inhalation modes on retinal vessels development in neonatal mice in order to provide experimental data for proper oxygen therapy for premature infants. A total of 144 postnatal day (P) 7 C57BL/6J mice were randomly assigned into 6 groups according to different oxygen inhalation modes (n=24). Experimental group 1 was exposed to 30%, 40%, 50%, 60% and 75% oxygen in turn for one day respectively, followed by room air exposure for 5 days. Experimental group 2 was exposed to 75%, 60%, 50%, 40% and 30% oxygen in turn for one day respectively, followed by room air exposure for 5 days. Experimental group 3 was exposed to 75% oxygen for 5 days, followed by room air exposure for 5 days. Experimental group 4 was exposed to 75% oxygen for 5 days, 50% oxygen for 2 days and 30% oxygen for 2 days, then room air exposure for 6 days. The supplemental 75% oxygen and room air recovering was performed alternately for the mice in Experimental group 5 for 3 times and then room air exposure for 5 days. The Control group was exposed to room air for consecutive 10 days. The retinal vascular development and proliferation were evaluated by the retinal flat-mounts (ADPase stained retina) and cross-section. The peripheral vascular pattern was clear, and a few avascular areas were seen in the Control group at P12. At P14 the avascular area disappeared. At P17, the entire vascular pattern became completely normal. In the Experimental groups 1, 3 and 5, the central vessels became tortuous and constricted and the central avascular area increased at P12. At P14, neovascularization was seen peaking at P17 in the Experimental groups 1, 3 and 5. In the Experimental group 4, the central avascular area increased and neovascularization was seen at P14, but the central avascular area was reduced and abnormal neovascularization disappeared, with slight constriction of the deep vessels, at P17. Five days later the vascular pattern became almost normal in the Experimental group 4. The retinal vascular form of the Experimental group 2 was similar to that of the Control group. The average number of neovascular nuclei extending into the vitreous per cross-section in the Experimental groups 1, 2, 3, 4, and 5 and the Control group was 49.50 +/- 1.36, 5.17 +/- 0.67, 47.68 +/- 4.70, 5.74 +/- 2.37, 29.15 +/- 2.48, and 1.22 +/- 0.20 respectively. There were significant differences between the Experimental groups 1, 3, 5 and the Control group (P < 0.05). The effects of different oxygen inhalation modes on the retinal vessels development in neonatal mice were different. The obvious fluctuation of inhaled oxygen concentration and abrupt stop of supplemental oxygen after high levels of supplemental oxygen may severely affect the development of retina vascular, leading to the pathologic changes similar to retinopathy of prematurity.
Kasagi, Yoshihiro; Okutani, Ryu; Oda, Yutaka
2015-02-01
We have opened an operating room in the perinatal care unit (PNCU), separate from our existing central operating rooms, to be used exclusively for cesarean sections. The purpose is to meet the increasing need for both emergency cesarean sections and non-obstetric surgeries. It is equipped with the same surgical instruments, anesthesia machine, monitoring system, rapid infusion system and airway devices as the central operating rooms. An anesthesiologist and a nurse from the central operating rooms trained the nurses working in the new operating room, and discussed solutions to numerous problems that arose before and after its opening. Currently most of the elective and emergency cesarean sections carried out during the daytime on weekdays are performed in the PNCU operating room. A total of 328 and 347 cesarean sections were performed in our hospital during 2011 and 2012, respectively, of which 192 (55.5 %) and 254 (73.2 %) were performed in the PNCU operating room. The mean occupancy rate of the central operating rooms also increased from 81 % in 2011 to 90 % in 2012. The PNCU operating room was built with the support of motivated personnel and multidisciplinary teamwork, and has been found to be beneficial for both surgeons and anesthesiologists, while it also contributes to hospital revenue.
[Implementation of modern operating room management -- experiences made at an university hospital].
Hensel, M; Wauer, H; Bloch, A; Volk, T; Kox, W J; Spies, C
2005-07-01
Caused by structural changes in health care the general need for cost control is evident for all hospitals. As operating room is one of the most cost-intensive sectors in a hospital, optimisation of workflow processes in this area is of particular interest for health care providers. While modern operating room management is established in several clinics yet, others are less prepared for economic challenges. Therefore, the operating room statute of the Charité university hospital useful for other hospitals to develop an own concept is presented. In addition, experiences made with implementation of new management structures are described and results obtained over the last 5 years are reported. Whereas the total number of operation procedures increased by 15 %, the operating room utilization increased more markedly in terms of time and cases. Summarizing the results, central operating room management has been proved to be an effective tool to increase the efficiency of workflow processes in the operating room.
Translations on USSR Resources, Number 763
1978-01-06
supplying gas pumping units, pipes, and other equipment. 33 Shatlyk . Complex Gas Preparation Unit i 1 * Medvezhe. Gas Prepara- tion Block. Thus...handled satisfactorily. . Shatlyk . Turkmengazprom. Central Control Station Combine with Head Facilities Operating Room. By means of the Impul’s-2 remote
INTERIOR, NORTH ROOM WITH CENTRAL DOOR TO EXTERIOR; VIEW TO ...
INTERIOR, NORTH ROOM WITH CENTRAL DOOR TO EXTERIOR; VIEW TO NORTHEAST - Fort Bragg, Noncommissioned Officers' Service Club, Guest House Building, South of Butner Road, Fayetteville, Cumberland County, NC
19 CFR 351.103 - Central Records Unit and Administrative Protective Order and Dockets Unit.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF COMMERCE ANTIDUMPING AND COUNTERVAILING DUTIES Scope and Definitions § 351.103 Central Records... Unit maintains a Public File Room in Room 1117, U.S. Department of Commerce, Pennsylvania Avenue and 14th Street, NW., Washington, DC 20230. The office hours of the Public File Room are between 8:30 a.m...
VIEW LOOKING SOUTHEAST AT BUILDING 121. THE BUILDING HOUSES OFFICES, ...
VIEW LOOKING SOUTHEAST AT BUILDING 121. THE BUILDING HOUSES OFFICES, THE ROCKY FLATS PLANT CENTRAL ALARM STATION, ALARM CONSOLES, THE ARMORY, THE LOCK AND KEY SECTION, A COMPUTER ROOM, A UTILITY ROOM, AND LOCKER ROOMS WITH SHOWERS. (1/98) - Rocky Flats Plant, Security & Armory, West of Third Street, south of Central Avenue, Golden, Jefferson County, CO
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hance, R.; /Fermilab
1998-08-26
This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).
24. INTERIOR OF CENTRAL ROOM. BASE POWER PANEL VISIBLE ON ...
24. INTERIOR OF CENTRAL ROOM. BASE POWER PANEL VISIBLE ON RIGHT WALL OF HALLWAY. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN ...
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN FLOOR. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Interior, central sunporch behind living room, looking northeast U.S. ...
Interior, central sunporch behind living room, looking northeast - U.S. Veterans Hospital, Jefferson Barracks, Medical Officer in Charge Residence, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
Social Skills Deficits in a Virtual Environment Among Spanish Children With ADHD.
García-Castellar, Rosa; Jara-Jiménez, Pilar; Sánchez-Chiva, Desirée; Mikami, Amori Y
2018-06-01
Research assessing the social skills of children with ADHD has predominantly relied upon North American samples. In addition, most existing work has been conducted using methodology that fails to use a controlled peer stimulus; such methods may be more vulnerable to cultural influence. We examined the social skills of 52 Spanish children (ages 8-12) with and without ADHD using a controlled Chat Room Task, which simulates a virtual social environment where peers' responses are held constant, so that participants' social skills may be assessed. After statistical control of typing and reading comprehension skills, Spanish children with ADHD gave fewer prosocial comments and had greater difficulty remembering central details from the conversation between the peers, relative to comparison children. The virtual Chat Room Task may be useful to assess social skills deficits using a controlled paradigm, resulting in the identification of common social deficiencies cross-culturally.
8. VIEW LOOKING NORTHWEST DOWN CENTRAL AXIS OF ROOM 110. ...
8. VIEW LOOKING NORTHWEST DOWN CENTRAL AXIS OF ROOM 110. NOTE CHANGE IN CEILING TREATMENT: WOOD PLANKS IN CENTER, ALL OTHER AREAS ARE GYPSUM BOARD. FLOOR IN CENTRAL AREA IS CONCRETE. POSTS AND BEAMS ARE ALL WOOD CONSTRUCTION. - Presidio of San Francisco, Cavalry Stables, Cowles Street, between Lincoln Boulevard & McDowell Street, San Francisco, San Francisco County, CA
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS ...
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS IN CONSOLE LOCATED CENTRALLY IN SLC-3E CONTROL ROOM. FROM LEFT TO RIGHT IN BACKGROUND: LAUNCH OPERATOR, LAUNCH ANALYST, AND FACILITIES PANELS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Patient visibility and ICU mortality: a conceptual replication.
Lu, Yi; Ossmann, Michelle M; Leaf, David E; Factor, Philip H
2014-01-01
This study reanalyzes the data from a study by Leaf, Homel, and Factor (2010) titled "Relationship between ICU Design and Mortality" by adopting and developing objective visibility measures. Various studies attribute healthcare outcomes (patient falls, satisfaction) to a vague notion of patient room visibility. The study by Leaf and colleagues was the first to draw an independent association between patient mortality and patient room visibility, however "visibility" remains imprecise. The original patient dataset was obtained from Dr. Leaf. The 664 patient sample assigned across 12 rooms at the medical ICU at Columbia University Medical Center was reanalyzed in terms of targeted visibility; the unit of analysis was the room, n = 12. Several computer-based visibility measures of patient rooms were used: patient head visibility, patient room visibility, and field of view to nursing station. Patient head visibility was defined as the percentage of area within the central nursing station from which the patient head could be seen; patient room visibility was defined as the percentage of area within the central nursing station that could see the patient room (average value of all patient room grids); field of view was defined as the maximum viewing angle from the patient head to the central nursing station. Among the sickest patients (those with Acute Physiology and Chronic Health Evaluation II > 30), field of view accounted for 33.5% of the variance in ICU mortality, p = 0.049. Subtle differences in patient room visibility may have important effects on clinical outcomes. Case study, critical care/intensive care, methodology, outcomes.
8. Several of the rental rooms are joined by doors, ...
8. Several of the rental rooms are joined by doors, and each room is accessed from the corridor. Originally, the transoms were glazed. When a central heating/cooling system was installed, the transoms were modified to accommodate air grilles that are supplied by a duct located in the corridor. The five-panel door and wood wainscot are original features. However, the wainscot does not occur in every room. The lath and plaster partitions and the wood flooring are typical of the original construction. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-24
... Director, Office of Protected Resources, National Marine Fisheries Service. [FR Doc. 2013-01343 Filed 1-23.... SUMMARY: On January 16, 2013, we, NMFS, published a proposed rule to designate a nonessential experimental... January 29, 2013, at the Fresno Metropolitan Flood Control District, Board Meeting Room, 5469 E. Olive...
18. The west end of the dining room contains four ...
18. The west end of the dining room contains four windows that overlook Central Avenue. As other millwork in the restaurant, these windows were originally finished with stain and varnish. Transoms retain their original operators. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
20. INTERIOR OF SOUTHERN ROOM. VIEW LOOKING NORTHWEST TOWARD HALL ...
20. INTERIOR OF SOUTHERN ROOM. VIEW LOOKING NORTHWEST TOWARD HALL CONNECTING WITH CENTRAL ROOM. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
Optimisation of the hybrid renewable energy system by HOMER, PSO and CPSO for the study area
NASA Astrophysics Data System (ADS)
Khare, Vikas; Nema, Savita; Baredar, Prashant
2017-04-01
This study is based on simulation and optimisation of the renewable energy system of the police control room at Sagar in central India. To analyse this hybrid system, the meteorological data of solar insolation and hourly wind speeds of Sagar in central India (longitude 78°45‧ and latitude 23°50‧) have been considered. The pattern of load consumption is studied and suitably modelled for optimisation of the hybrid energy system using HOMER software. The results are compared with those of the particle swarm optimisation and the chaotic particle swarm optimisation algorithms. The use of these two algorithms to optimise the hybrid system leads to a higher quality result with faster convergence. Based on the optimisation result, it has been found that replacing conventional energy sources by the solar-wind hybrid renewable energy system will be a feasible solution for the distribution of electric power as a stand-alone application at the police control room. This system is more environmentally friendly than the conventional diesel generator. The fuel cost reduction is approximately 70-80% more than that of the conventional diesel generator.
Low-temperature thermal control for a lunar base
NASA Technical Reports Server (NTRS)
Swanson, Theodore D.; Radermacher, Reinhard; Costello, Frederick A.; Moore, James S., Jr.; Mengers, David R.
1990-01-01
The generic problem of rejecting low- to moderate-temperature heat from space facilities located in a hot thermal sink environment is studied, and the example of a lunar base located near the equator is described. The effective thermal sink temperature is often above or near nominal room temperature. A three heat pump assisted thermal bus concept appears to be the most viable as they are the least sensitive to environmental conditions. Weight estimates are also developed for each of the five thermal control concepts studied: (1) 149kg/kW for a central thermal loop with unitary heat pumps; (2) 133 kg/kW for a conventional bus connected to large, central heat pumps at the radiator; (3) 134 kg/kW for a central, dual loop heat pump concept; (4) 95 kg/kW for the selective field-of-view radiator; and (5) 126 kg/kW for the regolith concept.
NASA Astrophysics Data System (ADS)
Cao, Ling; Che, Wenbin
2018-05-01
For the central air-conditioning energy-saving, it is common practice to use a wide range of PTD controllers in engineering to optimize energy savings. However, the shortcomings of the PTD controller have also been magnified on this issue, such as: calculation accuracy is not enough, the calculation time is too long. Particle swarm optimization has the advantage of fast convergence. This paper is based on Particle Swarm Optimization apply in PTD controller tuning parameters in order to achieve the purpose of saving energy while ensuring comfort. The algorithm proposed in this paper can adjust the weight according to the change of population fitness, reduce the weights of particles with lower fitness and enhance the weights of particles with higher fitness in the population, and fully release the population vitality. The method in this paper is validated by the TRNSYS model based on the central air-conditioning system. The experimental results show that the room temperature fluctuation is small, the overshoot is small, the adjustment speed is fast, and the energy-saving fluctuates at 10%.
[Handling modern imaging procedures in a high-tech operating room].
Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T
2012-03-01
Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.
FACILITY 713, DINING ROOM CABINET DOORS AND DOORS FROM LIVING ...
FACILITY 713, DINING ROOM CABINET DOORS AND DOORS FROM LIVING ROOM TO ENTRY PORCH IN RIGHT BACKGROUND, VIEW FACING NORTHWEST. - Schofield Barracks Military Reservation, Central-Entry Single-Family Housing Type, Between Bragg & Grime Streets near Ayres Avenue, Wahiawa, Honolulu County, HI
Data Recording Room in the 10-by 10-Foot Supersonic Wind Tunnel
1973-04-21
The test data recording equipment located in the office building of the 10-by 10-Foot Supersonic Wind Tunnel at the NASA Lewis Research Center. The data system was the state of the art when the facility began operating in 1955 and was upgraded over time. NASA engineers used solenoid valves to measure pressures from different locations within the test section. Up 48 measurements could be fed into a single transducer. The 10-by 10 data recorders could handle up to 200 data channels at once. The Central Automatic Digital Data Encoder (CADDE) converted this direct current raw data from the test section into digital format on magnetic tape. The digital information was sent to the Lewis Central Computer Facility for additional processing. It could also be displayed in the control room via strip charts or oscillographs. The 16-by 56-foot long ERA 1103 UNIVAC mainframe computer processed most of the digital data. The paper tape with the raw data was fed into the ERA 1103 which performed the needed calculations. The information was then sent back to the control room. There was a lag of several minutes before the computed information was available, but it was exponentially faster than the hand calculations performed by the female computers. The 10- by 10-foot tunnel, which had its official opening in May 1956, was built under the Congressional Unitary Plan Act which coordinated wind tunnel construction at the NACA, Air Force, industry, and universities. The 10- by 10 was the largest of the three NACA tunnels built under the act.
Research status and evaluation system of heat source evaluation method for central heating
NASA Astrophysics Data System (ADS)
Sun, Yutong; Qi, Junfeng; Cao, Yi
2018-02-01
The central heating boiler room is a regional heat source heating center. It is also a kind of the urban environment pollution, it is an important section of building energy efficiency. This article through to the evaluation method of central heating boiler room and overviews of the researches during domestic and overseas, summarized the main influence factors affecting energy consumption of industrial boiler under the condition of stable operation. According to the principle of establishing evaluation index system. We can find that is great significance in energy saving and environmental protection for the content of the evaluation index system of the centralized heating system.
Magnetization manipulation in multiferroic devices.
NASA Astrophysics Data System (ADS)
Gajek, Martin; Martin, Lane; Hao Chu, Ying; Huijben, Mark; Barry, Micky; Ramesh, Ramamoorthy
2008-03-01
Controlling magnetization by purely electrical means is a a central topic in spintronics. A very recent route towards this goal is to exploit the coupling between multiple ferroic orders which coexist in multiferroic materials. BiFeO3 (BFO) displays antiferromagnetic and ferroelectric orderings at room temperature and can thus be used as an electrically controllable pinning layer for a ferromagnetic electrode. Furthermore BFO remains ferroelectric down to 2nm and can therefore be integrated as a tunnel barrier in MTJ's. We will describe these two architecture schemes and report on our progresses towards the control of magnetization via the multiferroic layer in those structures.
FACILITY 713, LIVING ROOM SHOWING DIAMONDPANED WINDOWS FLANKING THE FIREPLACE, ...
FACILITY 713, LIVING ROOM SHOWING DIAMOND-PANED WINDOWS FLANKING THE FIREPLACE, AND LEADED-GLASS WINDOWS IN DINING ROOM IN RIGHT BACKGROUND, VIEW FACING SOUTHEAST. - Schofield Barracks Military Reservation, Central-Entry Single-Family Housing Type, Between Bragg & Grime Streets near Ayres Avenue, Wahiawa, Honolulu County, HI
Fay, Lindsey; Carll-White, Allison; Schadler, Aric; Isaacs, Kathy B; Real, Kevin
2017-10-01
The focus of this research was to analyze the impact of decentralized and centralized hospital design layouts on the delivery of efficient care and the resultant level of caregiver satisfaction. An interdisciplinary team conducted a multiphased pre- and postoccupancy evaluation of a cardiovascular service line in an academic hospital that moved from a centralized to decentralized model. This study examined the impact of walkability, room usage, allocation of time, and visibility to better understand efficiency in the care environment. A mixed-methods data collection approach was utilized, which included pedometer measurements of staff walking distances, room usage data, time studies in patient rooms and nurses' stations, visibility counts, and staff questionnaires yielding qualitative and quantitative results. Overall, the data comparing the centralized and decentralized models yielded mixed results. This study's centralized design was rated significantly higher in its ability to support teamwork and efficient patient care with decreased staff walking distances. The decentralized unit design was found to positively influence proximity to patients in a larger design footprint and contribute to increased visits to and time spent in patient rooms. Among the factors contributing to caregiver efficiency and satisfaction are nursing station design, an integrated team approach, and the overall physical layout of the space on walkability, allocation of caregiver time, and visibility. However, unit design alone does not solely impact efficiency, suggesting that designers must consider the broader implications of a culture of care and processes.
USDA-ARS?s Scientific Manuscript database
The present research hypothesized that the thermal, lighting and acoustic environments in commercial swine farrowing rooms vary over time and among crates. The study was conducted in 27 replicates in two commercial farrowing rooms in North Central Indiana, each equipped with 60 farrowing crates. Tem...
JOBS. A Partnership between Education and Industry.
ERIC Educational Resources Information Center
Mann, Sandra; And Others
This packet contains 15 lessons developed in a workplace basic skills project for the metal casting industry established jointly by Central Alabama Community College and Robinson Foundry, Inc. The lessons cover the following topics: (1) green sand schedule; (2) the core room; (3) the core room (continued); (4) figuring time; (5) the cleaning room;…
2005-01-01
The surgical hand scrub plays a significant role in preventing nosocomial and surgical site infections . After approval from the Infection Control...stressful conditions in a time- constrained environment. As a result, they are more comfortable with the hands - on aspects of patient care within the...amount of dust, organic debris, and microbial load in surgical environments. Proper cleaning of surfaces can greatly reduce the risk of nosocomial
Jousselme, Chloé; Vialet, Renaud; Jouve, Elisabeth; Lagier, Pierre; Martin, Claude; Michel, Fabrice
2011-03-01
To determine whether a sound-activated light-alarm device could reduce the noise in the central area of our pediatric intensive care unit and to determine whether this reduction was significant enough to decrease the noise that could be perceived by a patient located in a nearby room. The secondary objective was to determine the mode of action of the device. In a 16-bed pediatric and neonatal intensive care unit, a large and clearly noticeable sound-activated light device was set in the noisiest part of the central area of our unit, and noise measurements were made in the central area and in a nearby room. In a prospective, quasi-experimental design, sound levels were compared across three different situations--no device present, device present and turned on, and device present but turned off--and noise level measurements were made over a total of 18 days. None. Setting a sound-activated light device on or off. When the device was present, the noise was about 2 dB lower in the central area and in a nearby room, but there was no difference in noise level with the device turned on vs. turned off. The noise decrease in the central area was of limited importance but was translated in a nearby room. The sound-activated light device did not directly decrease noise when turned on, but repetition of the visual signal throughout the day raised staff awareness of noise levels over time.
Jiamjarasrangsi, W; Bualert, S; Chongthaleong, A; Chaindamporn, A; Udomsantisuk, N; Euasamarnjit, W
2009-04-01
Forty-two community and general hospitals in central Thailand. To examine the adequacy of indoor ventilation for nosocomial tuberculosis (TB) prevention in public hospitals in central Thailand. A cross-sectional survey was conducted among 323 patient care and ancillary areas in the target hospitals. Data on indoor ventilation rate were collected by the tracer gas method and reported as air changes per hour (ACH). The adequacy of the measured ventilation rates were then determined by comparison with the international recommended standard values. Indoor ventilation rates were inadequate in almost half of the studied areas (144/323, 44.6%). The inadequacy was particularly serious in the emergency rooms (ERs) and radiological areas, where 73.8% (31/42 each) of the rooms had ACH below the recommended standards. Detailed analysis showed that most of the rooms with natural ventilation had air exchange rates that exceeded the recommended standards, while the opposite was the case for rooms with air-conditioning, particularly the window or wall-mount type. Indoor ventilation in high-risk nosocomial TB areas in public hospitals in Thailand was inadequate due to the installation of air-conditioning systems in modern buildings.
7 CFR 980.212 - Import regulations; tomatoes.
Code of Federal Regulations, 2014 CFR
2014-01-01
...-2902 1 All California points Officer-in-charge, 784 South Central Ave., room 266, Los Angeles, Calif..., Santurce, P.R. 00908, phone 809-783-2230 or 4116 2 New York, N.Y Officer-in-charge, room 28A, Hunts Point... Officer-in-charge, 1350 Northwest 12th Ave., room 530, Miami, Fla. 33136, phone 305-324-6116 or 6117 1 All...
7 CFR 980.212 - Import regulations; tomatoes.
Code of Federal Regulations, 2013 CFR
2013-01-01
...-2902 1 All California points Officer-in-charge, 784 South Central Ave., room 266, Los Angeles, Calif..., Santurce, P.R. 00908, phone 809-783-2230 or 4116 2 New York, N.Y Officer-in-charge, room 28A, Hunts Point... Officer-in-charge, 1350 Northwest 12th Ave., room 530, Miami, Fla. 33136, phone 305-324-6116 or 6117 1 All...
7 CFR 980.212 - Import regulations; tomatoes.
Code of Federal Regulations, 2012 CFR
2012-01-01
...-2902 1 All California points Officer-in-charge, 784 South Central Ave., room 266, Los Angeles, Calif..., Santurce, P.R. 00908, phone 809-783-2230 or 4116 2 New York, N.Y Officer-in-charge, room 28A, Hunts Point... Officer-in-charge, 1350 Northwest 12th Ave., room 530, Miami, Fla. 33136, phone 305-324-6116 or 6117 1 All...
9. Typical 'furnished rooms' overlook the Washington Street alley. Each ...
9. Typical 'furnished rooms' overlook the Washington Street alley. Each has two double-hung windows that are fitted with roller-shade brackets. The plaster was formulated with lime and is heavily laden with animal hair. Each room is provided with a stove-pipe connection. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
ERIC Educational Resources Information Center
Goouch, Kathleen; Powell, Sacha
2013-01-01
This article has emerged from a research and development project, The Baby Room, which was designed to examine how babies are cared for in daycare settings. Within the project, a form of professional development was created which designated a central space for dialogic encounter, primarily to enable the baby room practitioners who participated in…
Chen, Connie E; Chen, Christopher T; Hu, Jia; Mehrotra, Ateev
2017-02-17
Walk-in clinics are growing in popularity around the world as a substitute for traditional medical care delivered in physician offices and emergency rooms, but their clinical efficacy is unclear. To assess the quality of care and patient satisfaction of walk-in clinics compared to that of traditional physician offices and emergency rooms for people who present with basic medical complaints for either acute or chronic issues. We searched CENTRAL, MEDLINE, Embase, six other databases, and two trials registers on 22 March 2016 together with reference checking, citation searching, and contact with study authors to identify additional studies. We applied no restrictions on language, publication type, or publication year. Study design: randomized trials, non-randomized trials, and controlled before-after studies. standalone physical clinics not requiring advance appointments or registration, that provided basic medical care without expectation of follow-up. Comparisons: traditional primary care practices or emergency rooms. We used standard methodological procedures expected by Cochrane and the Cochrane Effective Practice and Organisation of Care (EPOC) Group. The literature search identified 6587 citations, of which we considered 65 to be potentially relevant. We reviewed the abstracts of all 65 potentially relevant studies and retrieved the full texts of 12 articles thought to fit our study criteria. However, following independent author assessment of the full texts, we excluded all 12 articles. Controlled trial evidence about the mortality, morbidity, quality of care, and patient satisfaction of walk-in clinics is currently not available.
Alehashem, Maryam; Baniasadi, Shadi
2018-01-01
A great number of antineoplastic drugs (ANPDs) are used globally in cancer treatment. Due to their adverse health effects, occupational exposure to ANPDs is considered a potential health risk to health care workers. The current study aimed to evaluate safe-handling practices of ANPDs, exposure controls, and adverse health implications for health care providers exposed to ANDPs. Prevention measures, including engineering, administrative, and work practice controls, as well as personal protective equipment (PPE), were recorded daily through a questionnaire for six weeks. Acute adverse health effects experienced by health care workers were also documented. The implemented exposure controls for preparation, administration, cleaning, and waste disposal were not in accordance with the safe handling guidelines. Central nervous system disorders (26.33%) were the most frequent acute adverse effects reported by health care workers. A significant correlation was found between the number of experienced adverse effects and handling characteristics, including the number of preparations (r = 0.38, p < 0.05), dose, and the number of prepared drugs (r = 0.46, p < 0.01 and 0.39, p < 0.05), and working hours in different locations of oncology setting for six weeks (preparation room: r = 0.38, P < 0.05, treatment room: r = 0.46, P < 0.01, patient room: r = 0.63, P < 0.01, and station: r = 0.68, P < 0.01). Due to inadequate control measures, oncology health care workers were in danger of exposure to ANPDs and experienced acute adverse health effects. Implementation of appropriate exposure controls is required to prevent occupational exposure to ANPDs.
8. FIRST FLOOR INTERIOR, ONE OF THREE MAIN REFRIGERATIONFREEZER ROOMS ...
8. FIRST FLOOR INTERIOR, ONE OF THREE MAIN REFRIGERATION-FREEZER ROOMS (NO. 4), FROM CENTRAL CORRIDOR OPPOSITE ENTRANCE, LOOKING WEST. - Oakland Naval Supply Center, Cold Storage Warehouse, South of C Street between First & Second Street, Oakland, Alameda County, CA
143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...
143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
8. VIEW OF THE SWITCHGEAR AND ELECTRICAL SUPPLY ROOM IN ...
8. VIEW OF THE SWITCHGEAR AND ELECTRICAL SUPPLY ROOM IN BETWEEN SIDES A AND B OF BUILDING 883. EQUIPMENT WITHIN THE BUILDING REQUIRED AN EXTENSIVE AMOUNT OF POWER. THE ELECTRICAL SUPPLY ROOM IS ESSENTIALLY AN ELECTRICAL SUBSTATION. (1/23/57) - Rocky Flats Plant, Uranium Rolling & Forming Operations, Southeast section of plant, southeast quadrant of intersection of Central Avenue & Eighth Street, Golden, Jefferson County, CO
Interior view of south central staircase, identical primary and rear ...
Interior view of south central staircase, identical primary and rear elevation entries, modified Dining Room entry and closet conversation - 5904 Dalecarlia Place (House), Washington, District of Columbia, DC
13. VIEW OF A BBOX, WHICH WAS USED IN THE ...
13. VIEW OF A B-BOX, WHICH WAS USED IN THE FAST RECOVERY PROCESS. URANIUM OXIDE WAS TRANSFERRED FOR DISSOLUTION IN A ROOM WHICH HOUSED 3 ROWS OF B-BOXES. B-BOXES ARE CONTROLLED HOODS, SIMILAR TO LAB HOODS THAT OPERATED WITH HIGH AIR VELOCITIES AT THEIR OPENINGS TO ENSURE THAT THE VAPORS WERE CONTAINED WITHIN THE HOOD. (2/14/79) - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L Boring; David I Gertman; Tuan Q Tran
2008-09-01
This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and riskmore » associated with human performance in next generation control rooms.« less
10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM ...
10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM INTERIOR, SHOWING ESCAPE HATCH. Looking north along east wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
10. View (looking west) of the ground floor in the ...
10. View (looking west) of the ground floor in the south segment of the building. The door opening is on the Central Avenue sidewalk. The ground floor had two noteworthy pressed-steel ceilings, an elaborate one in the larger west room and a plain one in the smaller 'back room.' Most of the elaborate ceiling panels were removed when a suspended ceiling (here removed) was installed. The plain ceiling is still in-tact above the suspended ceiling. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
16. Detail of original wainscot in the dining room. The ...
16. Detail of original wainscot in the dining room. The wainscot panels are flat (not beveled) and are painted along the edge to simulate a raised (beveled) panel. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
SIG -- The Role of Human-Computer Interaction in Next-Generation Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L. Boring; Jacques Hugo; Christian Richard
2005-04-01
The purpose of this CHI Special Interest Group (SIG) is to facilitate the convergence between human-computer interaction (HCI) and control room design. HCI researchers and practitioners actively need to infuse state-of-the-art interface technology into control rooms to meet usability, safety, and regulatory requirements. This SIG outlines potential HCI contributions to instrumentation and control (I&C) and automation in control rooms as well as to general control room design.
Dormitory renovation project reduces energy use by 69%
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kokayko, M.J.
1997-06-01
Baldwin Hall is a three-story, 46,000 ft{sup 2} (4,273 m{sup 1}) dormitory on the campus of Allegheny College in Meadville, Pa. The building was originally built in the 1950s; an additional wing was added in the 1970s so that it has about 37,000 ft{sup 2} (3,437 m{sup 2}). The building contains approximately 100 double-occupancy student rooms; three common bathroom groups per floor; central study, lounge, and computer areas; and a laundry. Design for the renovation started in the winter of 1993; construction took place in the summer of 1994. The major goals of the renovation were: (1) to replace themore » entire building heating system (central boiler plant, distribution piping, and room heating terminals); (2) add a ventilation system within the building; (3) upgrade the building electrical system; (4) provide computer data cabling and cable TV wiring to each room; and, (5) improve room and hallway lighting and finishes.« less
Energy Systems Integration Facility Control Room | Energy Systems
Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
Zborowsky, Terri; Bunker-Hellmich, Lou; Morelli, Agneta; O'Neill, Mike
2010-01-01
Evidence-based findings of the effects of nursing station design on nurses' work environment and work behavior are essential to improve conditions and increase retention among these fundamental members of the healthcare delivery team. The purpose of this exploratory study was to investigate how nursing station design (i.e., centralized and decentralized nursing station layouts) affected nurses' use of space, patient visibility, noise levels, and perceptions of the work environment. Advances in information technology have enabled nurses to move away from traditional centralized paper-charting stations to smaller decentralized work stations and charting substations located closer to, or inside of, patient rooms. Improved understanding of the trade-offs presented by centralized and decentralized nursing station design has the potential to provide useful information for future nursing station layouts. This information will be critical for understanding the nurse environment "fit." The study used an exploratory design with both qualitative and quantitative methods. Qualitative data regarding the effects of nursing station design on nurses' health and work environment were gathered by means of focus group interviews. Quantitative data-gathering techniques included place- and person-centered space use observations, patient visibility assessments, sound level measurements, and an online questionnaire regarding perceptions of the work environment. Nurses on all units were observed most frequently performing telephone, computer, and administrative duties. Time spent using telephones, computers, and performing other administrative duties was significantly higher in the centralized nursing stations. Consultations with medical staff and social interactions were significantly less frequent in decentralized nursing stations. There were no indications that either centralized or decentralized nursing station designs resulted in superior visibility. Sound levels measured in all nursing stations exceeded recommended levels during all shifts. No significant differences were identified in nurses' perceptions of work control-demand-support in centralized and decentralized nursing station designs. The "hybrid" nursing design model in which decentralized nursing stations are coupled with centralized meeting rooms for consultation between staff members may strike a balance between the increase in computer duties and the ongoing need for communication and consultation that addresses the conflicting demands of technology and direct patient care.
Trial of real-time locating and messaging system with Bluetooth low energy.
Arisaka, Naoya; Mamorita, Noritaka; Isonaka, Risa; Kawakami, Tadashi; Takeuchi, Akihiro
2016-09-14
Hospital real-time location systems (RTLS) are increasing efficiency and reducing operational costs, but room access tags are necessary. We developed three iPhone 5 applications for an RTLS and communications using Bluetooth low energy (BLE). The applications were: Peripheral device tags, Central beacons, and a Monitor. A Peripheral communicated with a Central using BLE. The Central communicated with a Monitor using sockets on TCP/IP (Transmission Control Protocol/Internet Protocol) via a WLAN (wireless local area network). To determine a BLE threshold level for the received signal strength indicator (RSSI), relationships between signal strength and distance were measured in our laboratory and on the terrace. The BLE RSSI threshold was set at -70 dB, about 10 m. While an individual with a Peripheral moved around in a concrete building, the Peripheral was captured in a few 10-sec units at about 10 m from a Central. The Central and Monitor showed and saved the approach events, location, and Peripheral's nickname sequentially in real time. Remote Centrals also interactively communicate with Peripherals by intermediating through Monitors that found the nickname in the event database. Trial applications using BLE on iPhones worked well for patient tracking, and messaging in indoor environments.
24 CFR 3280.805 - Branch circuits required.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., water heater, range, and central or room air conditioner, etc.). There shall be one or more circuits of... specified for ranges in § 3280.811(a)(5). For central air conditioning, see Article 440 of the National...
24 CFR 3280.805 - Branch circuits required.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., water heater, range, and central or room air conditioner, etc.). There shall be one or more circuits of... specified for ranges in § 3280.811(a)(5). For central air conditioning, see Article 440 of the National...
24 CFR 3280.805 - Branch circuits required.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., water heater, range, and central or room air conditioner, etc.). There shall be one or more circuits of... specified for ranges in § 3280.811(a)(5). For central air conditioning, see Article 440 of the National...
75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...
Profile of central research and application laboratory of Aǧrı İbrahim Çeçen University
NASA Astrophysics Data System (ADS)
Türkoǧlu, Emir Alper; Kurt, Murat; Tabay, Dilruba
2016-04-01
Aǧrı İbrahim Çeçen University built a central research and application laboratory (CRAL) in the east of Turkey. The CRAL possesses 7 research and analysis laboratories, 12 experts and researchers, 8 standard rooms for guest researchers, a restaurant, a conference hall, a meeting room, a prey room and a computer laboratory. The CRAL aims certain collaborations between researchers, experts, clinicians and educators in the areas of biotechnology, bioimagining, food safety & quality, omic sciences such as genomics, proteomics and metallomics. It also intends to develop sustainable solutions in agriculture and animal husbandry, promote public health quality, collect scientific knowledge and keep it for future generations, contribute scientific awareness of all stratums of society, provide consulting for small initiatives and industries. It has been collaborated several scientific foundations since 2011.
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
75 FR 69912 - Pipeline Safety: Control Room Management/Human Factors
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... 192 and 195 [Docket ID PHMSA-2007-27954] RIN 2137-AE64 Pipeline Safety: Control Room Management/Human... rulemaking; Extension of comment period. SUMMARY: On September 17, 2010, PHMSA published a Control Room... Control Room Management/Human Factors rule at 49 CFR 192.631 and 195.446. The NPRM proposes to expedite...
Weclawik, Z
1989-01-01
The author describes the new merchant ship series B545-OT, built at the Szczecin shipyard. The preliminary appraisal of this vessel was made during the trial trip in November 1987. The experimented ship is a universal and very modern cargo boat, type B545-OT, which meets the requirements of the international conventions with respect to the prevention of sea pollution by ships. As regards its construction and equipment, the vessel complies with all conditions and international conventions on safety, as well as on health and environment protection. A control and actuation system centralized in the engine-room assures the functioning without a direct supervision. The automatic functioning of mechanisms is followed-up by means of a computed alarm system. The living-rooms, the recreation spaces, the cabins, which secure to the crew comfortable conditions on the ship, are built in a modern style. Less successfully was solved the placement of the kitchen, the dining-room and the larder on the upper deck, near the entrance to the engine-room, entailing thus the danger of steam penetration from the latter. The conditioned air assures in the cabins and living-rooms a temperature of +20 degrees C and a relative humidity of 40-60 per cent. The designers and builders have not used all the possibilities of lowering the intensity of noise.
Bacterial contamination of ex vivo processed PBPC products under clean room conditions.
Ritter, Markus; Schwedler, Joachim; Beyer, Jörg; Movassaghi, Kamran; Mutters, Reinier; Neubauer, Andreas; Schwella, Nimrod
2003-11-01
Patients undergoing high-dose radio- and/or chemotherapy and autologous or allogeneic PBPC transplantation are at high risk for infections owing to profound immunosuppression. In this study, the rate of microbial contamination of ex vivo processed PBPC products was analyzed, comparing preparation under clean room conditions to standard laboratory conditions. After implementation of good manufacturing practice conditions in the two participating institutions, the microbial contamination rate of 366 PBPC harvests from 198 patients was determined under certified clean room conditions (Group A) from 2000 until 2002. To investigate influence of improved environmental conditions along with other parameters, this set of samples was compared with a historical control set of 1413 PBPC products, which have been processed ex vivo under a clean bench in a regular laboratory room and were harvested from 626 patients (Group B) from 1989 until 2000. In Group B microbial contamination was found in 74 PBPC products (5.2%) from 57 patients. In Group A microbial growth was detected in 3 leukapheresis products (0.8%) from 3 patients. After exclusion of PBPC products, which were probably contaminated before manipulation, statistical analysis showed a significant difference (chi2= 10.339; p < 0.001). These data suggest an impact of clean room conditions on the bacterial contamination rate of PBPC products. To identify confounding variables, variables like technique of leukapheresis, culture methodology, and microbial colonization of central venous catheters were taken into account. Further variables might be identified in following studies.
A room of one's own: the SRO and the single elderly.
Crystal, S; Beck, P
1992-10-01
A survey of 485 single-room occupancy housing (SRO) residents in New York City found elderly residents strongly preferred to remain in centrally located neighborhoods where apartment housing was beyond their means; did not wish to share a housing unit; and had little confidence that they could find acceptable housing if they lost their present unit. For many elderly residents, SROs meet needs not easily met by available alternatives. Results suggest the need to maintain this housing option for older persons and replace losses that have accompanied gentrification in many central city areas.
Scalable architecture for a room temperature solid-state quantum information processor.
Yao, N Y; Jiang, L; Gorshkov, A V; Maurer, P C; Giedke, G; Cirac, J I; Lukin, M D
2012-04-24
The realization of a scalable quantum information processor has emerged over the past decade as one of the central challenges at the interface of fundamental science and engineering. Here we propose and analyse an architecture for a scalable, solid-state quantum information processor capable of operating at room temperature. Our approach is based on recent experimental advances involving nitrogen-vacancy colour centres in diamond. In particular, we demonstrate that the multiple challenges associated with operation at ambient temperature, individual addressing at the nanoscale, strong qubit coupling, robustness against disorder and low decoherence rates can be simultaneously achieved under realistic, experimentally relevant conditions. The architecture uses a novel approach to quantum information transfer and includes a hierarchy of control at successive length scales. Moreover, it alleviates the stringent constraints currently limiting the realization of scalable quantum processors and will provide fundamental insights into the physics of non-equilibrium many-body quantum systems.
Coherent Turbulence Rig in the Engine Research Building
1979-08-21
An engineer examines the Coherent Turbulence Rig in the Engine Research Building at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Coherent turbulence occurs when waves of uniform size and alignment are present in airflow. Researchers at NASA Lewis were interested in determining the relation between the size of the waves and their heat transfer properties. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities.
VIEW OF A BODY COUNTING ROOM IN BUILDING 122. BODY ...
VIEW OF A BODY COUNTING ROOM IN BUILDING 122. BODY COUNTING MEASURES RADIOACTIVE MATERIAL IN THE BODY. DESIGNED TO MINIMIZE EXTERNAL SOURCES OF RADIATION, BODY COUNTING ROOMS ARE CONSTRUCTED OF PRE-WORLD WAR II (WWII) STEEL. PRE-WWII STEEL, WHICH HAS NOT BEEN AFFECTED BY NUCLEAR FALLOUT, IS LOWER IS RADIOACTIVITY THAN STEEL CREATED AFTER WWII. (10/25/85) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO
Obesity and high blood pressure of 12-hour night shift female clean-room workers.
Chen, Jong-Dar; Lin, Yu-Cheng; Hsiao, Shu-Tin
2010-01-01
The 12 h shift schedule is widely used in clean rooms for electronic semiconductor production in Taiwan. This study investigated the associations of obesity and metabolic syndrome (MetS) components among women working in a semiconductor manufacturing factory in North Taiwan. Workers were divided into four groups according to their work schedules and duties (i.e., office workers, day workers, fixed 12 h day shift, and fixed 12 h night shiftworkers). The subjects comprised 1838 women who voluntarily attended a health examination between August 2006 and November 2006. Their mean (+/-SD) age was 33.6 (+/-7.1) yrs and their mean duration of work was 7.4 (+/-5.2) yrs. Each subject's health-related behaviors, body mass index, and MetS components were measured and analyzed using multivariate logistic regression. Obesity and MetS were defined according to World Health Organization criteria for Asian populations and the National Cholesterol Educational Program and Adult Treatment Panel III Guidelines, respectively. The results showed that women working in the clean room on fixed 12 h night shifts had significantly elevated odds ratios for obesity (OR, 2.7; 95% CI, 1.6-4.5), central obesity (OR, 2.9; 95% CI, 1.7-5.1), and high blood pressure (OR, 2.3; 95% CI, 1.2-4.4) compared to female office workers; these results persisted after adjusting for age, smoking, drinking, education, and duration of work. We did not find any significant differences in triglyceride and high-density lipoprotein cholesterol among women working different schedules. We conclude that working fixed 12 h night shifts was associated with an increased odds ratio for obesity, central obesity, and high blood pressure among clean-room women workers. Weight reduction and blood pressure control programs should be implemented in the workplace for women working fixed 12 h night shifts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann
In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator
19. At its east end, the dining room is separated ...
19. At its east end, the dining room is separated from the kitchen by a service room. On the south side of this room is an entrance to a rest room (left) and a dumb waiter (right). A large hoisting pulley is seen at the top of the shaft. Most of the apparatus is missing, but that which remains appears to be of a manual (non-electric) Type. An original lighting fixture, the only one encountered in the building, is seen near the center of the view. The service entrance into the dining room is located at the far right; the door into the kitchen is at the far left (almost in the margin of the photograph). Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
VIEW OF SITE EMPLOYEES CHECKINGIN IN THE CLOCK ROOM. EMPLOYEES ...
VIEW OF SITE EMPLOYEES CHECKING-IN IN THE CLOCK ROOM. EMPLOYEES WERE REQUIRED TO HAVE A SEPARATE BADGE FOR EACH AREA OF THE SITE THAT THEY ENTERED. (7/31/67) - Rocky Flats Plant, Offices, Print Shop & Photography Lab, Northwest quad of plant near terminus of Central Avenue, Golden, Jefferson County, CO
10. VIEW OF CALCINER IN ROOM 146148. THE CALCINER HEATED ...
10. VIEW OF CALCINER IN ROOM 146-148. THE CALCINER HEATED PLUTONIUM PEROXIDE TO CONVERT IT TO PLUTONIUM OXIDE. THE PROCESS REMOVED RESIDUAL WATER AND NITRIC ACID LEAVING A DRY, POWDERED PRODUCT. (4/29/65) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO
ERIC Educational Resources Information Center
Novell, Ireneanne
This practicum report describes a 15-day in-room suspension strategy designed to reduce the increasing number of principal-initiated student suspensions resulting from inappropriate conduct. The program's distinguishing features entailed a central figure who predetermined the candidates by means of a pre-suspension interview, parental-student…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald
2013-03-01
The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator ismore » also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.« less
A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya; Boring, Ronald; Joe, Jeffrey
Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.« less
The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training
NASA Technical Reports Server (NTRS)
Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)
2002-01-01
NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.
8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
PBF Control Building (PER619). Interior of control room shows control ...
PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya; Joe, Jeffrey; Rice, Brandon
Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.« less
Pacific Pediatric Advanced Care Initiative
2009-10-01
Prepare IV ports: Identify IV ports (UVC, Femoral venous line, other central venous lines, or PIV) for easy access to push meds or administer volume...Supply Department CVL central venous line CXR chest xray DC discontinue DI Diagnostic Imaging DIC disseminated intravascular coagulation diff...programs at KMCWC. These include the blood bank, blood utilization committee, clinical laboratories, operating room, central supply, pharmacy
The study of a space configuration using space syntax analysis Case study: an elderly housing
NASA Astrophysics Data System (ADS)
Mariana, Yosica; Triwardhani, Arindra J.; Isnaeni Djimantoro, Michael
2017-12-01
The improvement in various aspect leads to prolong the life span of human life, which increasing the number of elderly in the urban areas in return. But the increasing population is not supported by the provision of adequate housing facilities for them. Most of the elderly house in Jakarta, is designed just like for common people without relizing thatthey had physical and mentally degradation following the age. Therefore, the elderly house need to design with special attention to their daily activity mobility which applied in effective room configuration. The connectivity between the activities is most important element to order the room configuration. This research conduct to search the room configuration in elderly house which can improve their productivity and live quality by using the space syntax theory. The research methods by using the syntactic plug-in in Grasshooper software and analyse the integration, choice, control value and entrophy in the activity configuration. The result show that the effective and efficient for elderly house is cluster centralized pattern. The lobby and reception take the important role as the integration aspect and the spatial awareness according to elderly activity.
6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... Falls Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake... reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... Falls Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake... inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...
PBF Control Building (PER619). Interior of control room. Control console ...
PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Study About Ceiling Design for Main Control Room of NPP with HFE
NASA Astrophysics Data System (ADS)
Gu, Pengfei; Ni, Ying; Chen, Weihua; Chen, Bo; Zhang, Jianbo; Liang, Huihui
Recently since human factor engineering (HFE) has been used in control room design of nuclear power plant (NPP), the human-machine interface (HMI) has been gradual to develop harmoniously, especially the use of the digital technology. Comparing with the analog technology which was used to human-machine interface in the past, human-machine interaction has been more enhanced. HFE and the main control room (MCR) design engineering of NPP is a combination of multidisciplinary cross, mainly related to electrical and instrument control, reactor, machinery, systems engineering and management disciplines. However, MCR is not only equipped with HMI provided by the equipments, but also more important for the operator to provide a work environment, such as the main control room ceiling. The ceiling design of main control room related to HFE which influences the performance of staff should also be considered in the design of the environment and aesthetic factors, especially the introduction of professional design experience and evaluation method. Based on Ling Ao phase II and Hong Yanhe project implementation experience, the study analyzes lighting effect, space partition, vision load about the ceiling of main control room of NPP. Combining with the requirements of standards, the advantages and disadvantages of the main control room ceiling design has been discussed, and considering the requirements of lightweight, noise reduction, fire prevention, moisture protection, the ceiling design solution of the main control room also has been discussed.
2012-11-16
CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis
2012-11-16
CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis
Lee, Wen-Sen; Hsieh, Tai-Chin; Shiau, Justine C; Ou, Tsong-Yih; Chen, Fu-Lun; Liu, Yu-Hsin; Yen, Muh-Yong; Hsueh, Po-Ren
2017-10-01
This prospective before-after study was intended to investigate the effect of Bio-Kil on reducing environmental bacterial burden and healthcare-associated infections (HAIs) in intensive care units (ICUs) at the Municipal Wan-Fang Hospital, Taipei, Taiwan in 2014. Four rooms in the medical and surgical ICUs were investigated and designated as study rooms (n = 2) or control rooms (n = 2). Routine disinfection was performed during the pre-intervention period in both room types. Bio-Kil was applied to the fomites and surroundings of the study rooms during the intervention period. Total bacterial burden and proportion of colonization of fomites and surroundings by multidrug-resistance organisms (MDROs) were determined before and after the intervention. The demographic characteristics, underlying conditions, and clinical outcomes of patients were analyzed. After application of Bio-Kil, the bacterial burden declined in both groups, although the reduction was greater in the study rooms as compared with the control rooms (p = 0.001). During the pre-intervention period, 16 patients were admitted to control rooms and 18 patients to study rooms. After the intervention, 22 patients were admitted to control rooms and 21 patients to study rooms. The number of cases of new-onset sepsis declined in the intervention group (from 33% to 23.8%), but increased in the control group (from 25% to 40.9%); however, there was no significant difference in incidence of new-onset sepsis between the study and control rooms after intervention. Application of Bio-Kil reduced the environmental bacterial burden and MDROs in ICUs. Further studies are needed to evaluate the efficacy of this nanotechnology-based disinfectant in reducing HAIs. Copyright © 2016. Published by Elsevier B.V.
3. VIEW OF THE DEPRESSION PIT IN ROOM 103, IN ...
3. VIEW OF THE DEPRESSION PIT IN ROOM 103, IN 1965, WHEREIN FISSILE SOLUTION WAS STORED. THIS PHOTOGRAPH SHOWS THE URANIUM SOLUTION TANKS ON THE LEFT AND THE PLUTONIUM SYSTEM ON THE RIGHT. NO PLUTONIUM SOLUTION WAS EVER STORED IN BUILDING 886. - Rocky Flats Plant, Critical Mass Laboratory, Intersection of Central Avenue & 86 Drive, Golden, Jefferson County, CO
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake River in Gooding... reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, [email protected] , for TTY, call (202) 502- 8659. A copy is also available for inspection and reproduction at...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake River from river... inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...
16 CFR 305.7 - Determinations of capacity.
Code of Federal Regulations, 2010 CFR
2010-01-01
... appendix P to 10 CFR part 430, subpart B. (f) Room air conditioners. The capacity shall be the cooling... 430, subpart B. (i) Central air conditioners, cooling. The capacity shall be the cooling capacity in... capacities between 38,000 and 64,999 Btu's per hour. (j) Central air conditioners, heating. The capacity...
16 CFR 305.7 - Determinations of capacity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... determined according to appendix P to 10 CFR part 430, subpart B. (f) Room air conditioners. The capacity... 10 CFR part 430, subpart B. (i) Central air conditioners, cooling. The capacity shall be the cooling... hour for capacities between 38,000 and 64,999 Btu's per hour. (j) Central air conditioners, heating...
Betty Petersen Memorial Library
NOAA logo - Click to go to the NOAA homepage Betty Petersen Memorial Library NOAA Library Logo ... library image Betty Petersen Memorial Library is a branch of the NOAA Central Library jointly funded by / NOAA Central Library Betty Petersen Memorial Library 5830 University Research Court Room 1650, E / OC4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kasemir, Kay; Hartman, Steven M
2009-01-01
A new alarm system toolkit has been implemented at SNS. The toolkit handles the Central Control Room (CCR) 'annunciator', or audio alarms. For the new alarm system to be effective, the alarms must be meaningful and properly configured. Along with the implementation of the new alarm toolkit, a thorough documentation and rationalization of the alarm configuration is taking place. Requirements and maintenance of a robust alarm configuration have been gathered from system and operations experts. In this paper we present our practical experience with the vacuum system alarm handling configuration of the alarm toolkit.
Microcomputer keeps watch at Emerald Mine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-04-01
This paper reviews the computerized mine monitoring system set up at the Emerald Mine, SW Pennsylvania, USA. This coal mine has pioneered the automation of many production and safety features and this article covers their work in fire detection and conveyor belt monitoring. A central computer control room can safely watch over the whole underground mining operation using one 25 inch colour monitor. These new data-acquisition systems will lead the way, in the future, to safer move efficient coal mining. Multi-point monitoring of carbon monoxide, heat anomalies, toxic gases and the procedures in conveyor belt operation from start-up to closedown.
Voltage-controlled interlayer coupling in perpendicularly magnetized magnetic tunnel junctions
Newhouse-Illige, Ty; Liu, Yaohua; Xu, M.; ...
2017-05-16
Magnetic interlayer coupling is one of the central phenomena in spintronics. It has been predicted that the sign of interlayer coupling can be manipulated by electric fields, instead of electric currents, thereby offering a promising low energy magnetization switching mechanism. Here we present the experimental demonstration of voltage-controlled interlayer coupling in a new perpendicular magnetic tunnel junction system with a GdO x tunnel barrier, where a large perpendicular magnetic anisotropy and a sizable tunnelling magnetoresistance have been achieved at room temperature. Owing to the interfacial nature of the magnetism, the ability to move oxygen vacancies within the barrier, and amore » large proximity-induced magnetization of GdO x, both the magnitude and the sign of the interlayer coupling in these junctions can be directly controlled by voltage. Lastly, these results pave a new path towards achieving energy-efficient magnetization switching by controlling interlayer coupling.« less
Voltage-controlled interlayer coupling in perpendicularly magnetized magnetic tunnel junctions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newhouse-Illige, Ty; Liu, Yaohua; Xu, M.
Magnetic interlayer coupling is one of the central phenomena in spintronics. It has been predicted that the sign of interlayer coupling can be manipulated by electric fields, instead of electric currents, thereby offering a promising low energy magnetization switching mechanism. Here we present the experimental demonstration of voltage-controlled interlayer coupling in a new perpendicular magnetic tunnel junction system with a GdO x tunnel barrier, where a large perpendicular magnetic anisotropy and a sizable tunnelling magnetoresistance have been achieved at room temperature. Owing to the interfacial nature of the magnetism, the ability to move oxygen vacancies within the barrier, and amore » large proximity-induced magnetization of GdO x, both the magnitude and the sign of the interlayer coupling in these junctions can be directly controlled by voltage. Lastly, these results pave a new path towards achieving energy-efficient magnetization switching by controlling interlayer coupling.« less
1. VIEW IN ROOM 125, BIOASSAY LABORATORY, SHOWN IS THE ...
1. VIEW IN ROOM 125, BIOASSAY LABORATORY, SHOWN IS THE FIRST STEP IN A SIX-STEP PROCESS TO ANALYZE URINE SAMPLES FOR PLUTONIUM AND URANIUM CONTAMINATION. IN THIS STEP, NITRIC ACID IS ADDED TO SAMPLE, AND THE SAMPLE IS BOILED DOWN TO A WHITE POWDER. - Rocky Flats Plant, Health Physics Laboratory, On Central Avenue between Third & Fourth Streets, Golden, Jefferson County, CO
2. VIEW IN ROOM 111, ATOMIC ABSORPTION BERYLLIUM ANALYSIS LABORATORY. ...
2. VIEW IN ROOM 111, ATOMIC ABSORPTION BERYLLIUM ANALYSIS LABORATORY. AIR FILTERS AND SWIPES ARE DISSOLVED WITH ACIDS AND THE REMAINING RESIDUES ARE SUSPENDED IN NITRIC ACID SOLUTION. THE SOLUTION IS PROCESSED THROUGH THE ATOMIC ABSORPTION SPECTROPHOTOMETER TO DETECT THE PRESENCE AND LEVELS OF BERYLLIUM. - Rocky Flats Plant, Health Physics Laboratory, On Central Avenue between Third & Fourth Streets, Golden, Jefferson County, CO
31. Locker room. While at work, laborers stored their street ...
31. Locker room. While at work, laborers stored their street clothes in lockers. At the end of their shift, work clothes--sweaty and damp--were placed into open metal baskets and raised to the ceiling by chain and pulley. They were thus able to dry before the next day's use. - Central Furnaces, 2650 Broadway, east bank of Cuyahoga River, Cleveland, Cuyahoga County, OH
24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...
24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR VIEW LOOKING WEST AT NORTH END OF CENTRAL CORRIDOR (ROOM 3). STAIRWAY WORKBENCH WITH COMPRESSED-AIR POWERED CARTRIDGE LOADER. ARMORED PASS-THROUGH OF TRANSFER BOX FOR PASSING EXPLOSIVES MATERIALS THROUGH TO NEXT ROOM TO THE NORTH. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ
Hypothermic and antipyretic effects of ACTH (1-24) and alpha-melanotropin in guinea-pigs
NASA Technical Reports Server (NTRS)
Kandasamy, S. B.; Williams, B. A.
1984-01-01
Intracerebroventricular administration of adrenocorticotropin (ACTH 1-24) and alpha-melanotropin (alpha-MSH), peptides which occur naturally in brain induced dose-related hypothermia in guinea-pigs at room temperature (21 C) and also produced greater hypothermia at low (10 C) ambient temperature. However, when the experiments were repeated in a warm (30 C) environment, no effect on body temperature was observed. These results indicate that the peptides did not reduce the central set-point of temperature control. The hypothermia induced by ACTH and alpha-MSH was not mediated via histamine H1- or H2-receptors and serotonin since the H1-receptor antagonist, mepyramine, the H2-receptor antagonist, cimetidine, and the serotonin antagonist, methysergide, had no antagonistic effects. The peptides were antipyretic since they reduced pyrogen-induced-fever and hyperthermia due to prostaglandin E2, norepinephrine and dibutyryl cAMP, at a dose which did not affect normal body temperature. The powerful central effects of these peptides on normal body temperature, fever and hyperthermia, together with their presence of the brain regions important to temperature control, suggest that they participate in thermoregulation.
Main Control Room, view to the east. The door to ...
Main Control Room, view to the east. The door to the motor room is to the right, and the main control cabinets are to the left - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Fink, D. Hill, J. O'Hara
2004-11-30
Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Margulis, Katherine; Zhang, Xiangyi; Joubert, Lydia -Marie
Template–free fabrication of non–spherical polymeric nanoparticles is desirable for various applications, but has had limited success owing to thermodynamic favorability of sphere formation. Herein we present a simple way to prepare cubic nanoparticles of block copolymers by self–assembly from aqueous solutions at room temperature. Nanocubes with edges of 40–200 nm are formed spontaneously on different surfaces upon water evaporation from micellar solutions of triblock copolymers containing a central poly(ethylene oxide) block and terminal trimethylene carbonate/dithiolane blocks. These polymers self–assemble into 28±5 nm micelles in water. Upon drying, micelle aggregation and a kinetically controlled crystallization of central blocks evidently induce solidmore » cubic particle formation. An approach for preserving the structures of these cubes in water by thiol– or photo–induced crosslinking was developed. In conclusion, the ability to solubilize a model hydrophobic drug, curcumin, was also explored.« less
Margulis, Katherine; Zhang, Xiangyi; Joubert, Lydia -Marie; ...
2017-10-27
Template–free fabrication of non–spherical polymeric nanoparticles is desirable for various applications, but has had limited success owing to thermodynamic favorability of sphere formation. Herein we present a simple way to prepare cubic nanoparticles of block copolymers by self–assembly from aqueous solutions at room temperature. Nanocubes with edges of 40–200 nm are formed spontaneously on different surfaces upon water evaporation from micellar solutions of triblock copolymers containing a central poly(ethylene oxide) block and terminal trimethylene carbonate/dithiolane blocks. These polymers self–assemble into 28±5 nm micelles in water. Upon drying, micelle aggregation and a kinetically controlled crystallization of central blocks evidently induce solidmore » cubic particle formation. An approach for preserving the structures of these cubes in water by thiol– or photo–induced crosslinking was developed. In conclusion, the ability to solubilize a model hydrophobic drug, curcumin, was also explored.« less
24 CFR 3280.805 - Branch circuits required.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., water heater, range, and central or room air conditioner, etc.). There shall be one or more circuits of... outlets, the sum of rated amperes shall not exceed the branch-circuit rating. Motor loads or other... specified for ranges in § 3280.811(a)(5). For central air conditioning, see Article 440 of the National...
28. VIEW OF CENTRAL SECTION OF MILL FROM NORTH. COMPRESSOR ...
28. VIEW OF CENTRAL SECTION OF MILL FROM NORTH. COMPRESSOR ROOM BELOW PRECIPITATION FLOOR IS VISIBLE AT LOWER LEFT; THE SECONDARY THICKENER ADDITION IS TO THE RIGHT WITH SECONDARY THICKENER No. 7 OFF VIEW TO RIGHT. - Bald Mountain Gold Mill, Nevada Gulch at head of False Bottom Creek, Lead, Lawrence County, SD
15. The second story in the north segment of the ...
15. The second story in the north segment of the building was originally constructed as a restaurant. The north wall of the dining room retains the original wood wainscot and double-hung windows. At some undetermined time, a building was constructed on the adjacent property; blocking the windows in the dining room. Several chimneys with stove-pipe connections occur in the room. The members seen on the floor are part of a system recently installed to support the failing roof. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1A, DIRECTORATE OF ...
5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1-A, DIRECTORATE OF MISSILE CAPTIVE TEST, EDWARDS AFB, 15 JAN 58, 3097.58." Two men working in the control room. Photo no. "3097 58; G-AFFTC 15 JAN 58, T.S. 1-A Control". - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation
NASA Technical Reports Server (NTRS)
Lux-Baumann, Jesica; Dees, Ray; Fratello, David
2006-01-01
The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.
Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation
NASA Technical Reports Server (NTRS)
Lux-Baumann, Jessica R.; Dees, Ray A.; Fratello, David J.
2006-01-01
The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.
Main control room, showing original sixpane windows and doors to ...
Main control room, showing original six-pane windows and doors to pump motor room at left. The main control cabinets and switchgear, visible on right, were replaced in 2003. View to the south - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ
VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0, LOOKING WEST. ...
VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0, LOOKING WEST. THESE PANELS WERE WHERE THE A-MOTOR TAPES WOULD HAVE BEEN VISIBLE IN THE CONTROL ROOM. MORE RECENT MONITOR IN UPPER CENTER FOR LTR FLUX MONITORS - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
25. VIEW OF THE MACHINE TOOL LAYOUT IN ROOMS 244 ...
25. VIEW OF THE MACHINE TOOL LAYOUT IN ROOMS 244 AND 296. MACHINES WERE USED FOR STAINLESS STEEL FABRICATION (THE J-LINE). THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
Evaluation of the Tuberculosis Infection Control Training Center, Tajikistan, 2014–2015
Scott, C.; Mangan, J.; Tillova, Z.; Jensen, P. A.; Ahmedov, S.; Ismoilova, J.; Trusov, A.
2017-01-01
SUMMARY SETTING Training center on tuberculosis (TB) infection control (IC) for health care workers in the Central Asian Republics region. OBJECTIVE To assess the effects of TB IC training courses conducted at the Tuberculosis Infection Control Training Center in Machiton, Tajikistan. DESIGN Participants who participated in training (n = 89) during the first year of operation (April 2014–February 2015) were invited to participate in a post-training interview. RESULTS Of the 89 participants, 84 (94%) completed the interview and expressed satisfaction with the training. Eighty (95%) participants reported meeting with workplace leadership to discuss the training. Of these, 69 (85%) reported discussing changes required to meet TB IC standards. Self-reported changes in TB IC practices at work facilities post training included the creation of TB IC committees, designation of a TB IC focal person, TB IC planning, policies to separate infectious patients in waiting rooms, provision of masks for infectious patients, development of cough etiquette policies, improved glove availability, hand hygiene programs, and TB IC posters in waiting rooms. CONCLUSIONS Participant satisfaction and reported changes in TB IC activities illustrate the potential of these training courses to improve TB IC in the region. Future training courses may be tailored to specific audiences using a structured conceptual framework to impact administration, budgeting, and facilities management of TB IC practices. PMID:28399974
2014-04-03
CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Front view of bldg 30 which houses mission control
1984-08-30
41D-3072 (30 Aug 1984) --- A 41-D shift change is taking place in the Johnson Space Center's Building 30. In its twenty years of operation, the mission control center has been the scene of many such changes. The windowless wing at left houses three floors, including rooms supporting flight control rooms 1 & 2 (formerly called mission operations control rooms 1 & 2).
VIEW OF CABLES AND TAPES ASSOCIATED WITH ADRIVE CONTROL ROD ...
VIEW OF CABLES AND TAPES ASSOCIATED WITH A-DRIVE CONTROL ROD SYSTEM, AT LEVEL +15, DIRECTLY ABOVE PDP CONTROL ROOM, LOOKING NORTHWEST. THE CABLES FROM THE PDP ROOM GO THROUGH THE CONCRETE WALL, MAKE A RIGHT ANGLE TURN DOWNWARD, AND DESCEND INTO THE PDP CONTROL ROOM AS VERTICAL TAPES - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
10. Interior view of control room in Components Test Laboratory ...
10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
An application of corelap algoritm to improve the utilization space of the classroom
NASA Astrophysics Data System (ADS)
Sembiring, A. C.; Budiman, I.; Mardhatillah, A.; Tarigan, U. P.; Jawira, A.
2018-04-01
The high demand of the room due to the increasing number of students requires the addition of the room The limited number of rooms, the price of land and the cost of building expensive infrastructure requires effective and efficient use of the space. The facility layout redesign is done using the Computerized Relationship Planning (CORELAP) algorithm based on total closeness rating (TCR). By calculating the square distance between the departments based on the coordinates of the central point of the department. The distance obtained is multiplied by the material current from the From-to chart matrix. The analysis is done by comparing the total distance between the initial layout and the proposed layout and then viewing the activities performed in each room. The results of CORELAP algorithm processing gives an increase of room usage efficiency equal to 14, 98% from previous activity.
Acoustical criteria for hospital patient rooms: Resolving competing requirements
NASA Astrophysics Data System (ADS)
Brooks, Bennett M.
2003-10-01
The acoustical criteria for patient rooms in hospitals, nursing homes, and rehabilitation facilities may be based on several needs. One important requirement is that noise levels in the room be conducive to restful sleep. Also, caregivers must have easy auditory and visual access to the patients, and be able to hear vital sign monitor alarms. This often means that patient rooms are located near central nurse stations and that patient room doors are left open. Further, the recently published federal privacy standards developed by the U.S. Department of Health and Human Services (HSS) under the Health Insurance Portability and Accountability Act (HIPAA) require that ``appropriate physical safeguards'' be put in place to protect the confidentiality of patient health information. The simultaneous and competing requirements for speech privacy, caregiver access, and good sleeping conditions present a serious acoustical challenge to health care facility designers. Specific facility design issues and potential solution strategies are presented.
3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...
3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID
5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ...
5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ROOM; PASS-THROUGH FOR EXPOSED FILM ON RIGHT - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Measuring Human Performance in Simulated Nuclear Power Plant Control Rooms Using Eye Tracking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kovesdi, Casey Robert; Rice, Brandon Charles; Bower, Gordon Ross
Control room modernization will be an important part of life extension for the existing light water reactor fleet. As part of modernization efforts, personnel will need to gain a full understanding of how control room technologies affect performance of human operators. Recent advances in technology enables the use of eye tracking technology to continuously measure an operator’s eye movement, which correlates with a variety of human performance constructs such as situation awareness and workload. This report describes eye tracking metrics in the context of how they will be used in nuclear power plant control room simulator studies.
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Interior of display area (room 101), looking south towards TV ...
Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Quan, Xiaobo; Joseph, Anjali; Ensign, Janet C
2012-01-01
The built environment significantly affects the healthcare experiences of patients and staff. Healthcare administrators and building designers face the opportunity and challenge of improving healthcare experience and satisfaction through better environmental design. The purpose of the study was to evaluate how a novel environmental intervention for imaging rooms, which integrated multiple elements of healing environments including positive distractions and personal control over environment, affects the perceptions and satisfactions of its primary users-patients and staff. Anonymous questionnaire surveys were conducted to compare patient and staff perceptions of the physical environment, satisfaction, and stress in two types of imaging rooms: imaging rooms with the intervention installed (intervention rooms) and traditionally designed rooms without the intervention (comparison rooms). Imaging technologists and patients perceived the intervention rooms to be significantly more pleasant-looking. Patients in the intervention rooms reported significantly higher levels of environmental control and were significantly more willing to recommend the intervention rooms to others. The environmental intervention was effective in improving certain aspects of the imaging environment: pleasantness and environmental control. Further improvement of the imaging environment is needed to address problematic areas such as noise.
11. Historic view of Building 100 control room, showing personnel ...
11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas
2006-06-01
One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.
NASA Astrophysics Data System (ADS)
Jankó, A.; Bánfi, R.
2009-04-01
The Royal Hungarian State Mapping Institute kept the smaller scales series of the third military survey of the Austro-Hungarian Monarchy, too, so the scales 1:200,000 and 1:750,000 maps. The results of the supervisions of larger scales were transferred onto these scales, 1:200,000 and 1:750,000 maps, for the territory of Central Europe. In 1943 a scale 1:500,000 aerial map was accomplished, too, for the territory of Pannonian basin. There are many other important series in the Map Room between 1919 and 1945, including the WWII German edition 1:300,000 scale map series of Central Europe and Russia to the Ural Mts.; and a series of scale 1:100,000 for the territory of Poland and Russia between 1939-1940.
2014-04-03
CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
DOE Office of Scientific and Technical Information (OSTI.GOV)
BLanc, Katya Le; Powers, David; Joe, Jeffrey
2015-08-01
Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologiesmore » that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.« less
29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...
29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA
28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...
28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA
West wall, display area (room 101), view 1 of 4: ...
West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
17. The south wall of the dining room has an ...
17. The south wall of the dining room has an original wood wainscot similar to the one present on the north wall. However, in lieu of windows it appears to have been constructed with mirrors, which are no longer in place. The electrical boxes are nonoriginal elements. Simulated panel bevels are readily apparent in this view. Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
Fungi inhabiting household environments in Riyadh, Saudi Arabia.
Bokhary, H A; Parvez, S
1995-05-01
Fungi inhabiting household environments in the West, East and Central localities of Riyadh city were screened. The screened area included bedrooms, drawing rooms, living rooms, kitchens and bathrooms. The common genera of fungi isolated were Alternaria, Aspergillus, Cercospora, Chaetomium, Cladosporium, Curvularia, Drechslera, Embellisia, Fusarium, Mucor, Penicillium, Rhizopus, Scytalidium, Trichoderma, Torula and Ulocladium. Two uncommon genera Nodulosporium and Oidiodendron for Saudi Arabian mycoflora were also isolated. In all the localities, the highest number of fungal colonies per plate or per gram were found in the living rooms, followed by bedrooms. The number of colonies per plate or per gram was in general higher in densely populated than in less populated areas.
Chambers, Earle C; Bafna, Sonit; Machry, Herminia
2018-02-01
In this study of low-income Hispanic/Latino adults living in 291 individual apartments in the Bronx, New York, the apartment layout was significantly associated with the odds of depressive symptomology. Women living in apartments in which the most central rooms were the living, dining, or kitchen (i.e., rooms commonly used for communal activities) were less likely to have depressive symptomology (OR = 0.44, 95% CI = 0.22-0.86) than women in apartments where the central rooms were lobbies or corridors, adjusting for demographics, health conditions, and housing and neighborhood characteristics. No statistically significant association was observed in men. We present the logic underlying the use of layout variables in this study and discuss the implications it may have for understanding the role of the home environment on psychological distress among inhabitants. The results of this study show how space syntax analysis can be used to better understanding disparities in the risk of depression and offer an additional opportunity for public health stakeholders to identify those most at risk for depression.
Governing time in operating rooms.
Riley, Robin; Manias, Elizabeth
2006-05-01
This paper examines how time is controlled and governed in operating rooms through interpersonal communication between nurses and doctors. Time is a valuable commodity in organizations with improvements often directed towards maximizing efficiencies. As a consequence, time can be a source of tension and interpersonal conflict as individuals compete for control of its use. The data in this paper emanate from an ethnographic study that explored a range of communication practices in operating room nursing. Participants comprised 11 operating room nurses. Data were collected over two years in three different institutional settings and involved participant observation, interviews and the keeping of a personal diary. A deconstructive analysis of the data was undertaken. Results are discussed in terms of the practices, in which clinicians are engaged in, to govern and control their use of time. The four practices presented in this paper include; questioning judgment and timing, controlling speed, estimating surgeons' use of time and coping with different perceptions of time. Time and speed were hotly contested by nurses. They used their personal knowledge of individual surgeon's habits of time to govern and control practice. Nurses thought about surgeons in terms of time and developed commonly accepted understandings about the length of surgical procedures. They used this knowledge to manage the scheduling of operations in the departments and to control the workflow in individual operating rooms. Knowledge of individual surgeons was a source of power for operating room nurses. Nurses have more power in the operating room than might be imagined but they exercise this power in subtle ways. If operating rooms are to work effectively, the operating room team must understand each others' work better.
Promoting Hand Hygiene With a Lighting Prompt.
Diegel-Vacek, Lauren; Ryan, Catherine
2016-10-01
The objective of this pilot study was to assess an automatic sink light design intervention as a prompt for clinician hand hygiene (as defined by World Health Organization [WHO]). Healthcare-associated infections (HAIs) are still leading causes of morbidity and mortality and contribute to burdens on our healthcare system. Hand hygiene has been related to reducing the rate of HAIs and positively impacting both patient and hospital outcomes. This pilot study was a prospective, longitudinal observational study of a convenience sample of healthcare clinicians. In one inpatient room, clinicians were exposed to a hand hygiene reminder that consisted of a light turning on over the sink as they entered. A control room (the adjacent inpatient room) did not have the intervention. A total of 88 clinician encounters were monitored during the study. On the first observation day at the initial activation of the signal light system, the percentage of clinicians performing hand hygiene upon entering a room was only 7% in the control room and 23% in the intervention room. During the second observation (Day 14), those percentages were 16% in the control room and 30% in the intervention room. During the third observation (Day 21), those percentages were 23% in the control room and 23% in the intervention room. The healthcare system frequently relies on expensive technology to improve healthcare delivery, but implementation of low-cost, low-technology methods such as this light may be effective in prompting hand hygiene. © The Author(s) 2016.
Design of the thermal insulating test system for doors and windows of buildings
NASA Astrophysics Data System (ADS)
Yu, Yan; Qi, Jinqing; Xu, Yunwei; Wu, Hao; Ou, Jinping
2011-04-01
Thermal insulating properties of doors and widows are important parameter to measure the quality of windows and doors. This paper develops the thermal insulating test system of doors and windows for large temperature difference in winter in north of China according to national standards. This system is integrated with temperature measurement subsystem, temperature control subsystem, the heating power measurement subsystem, and heat transfer coefficient calculated subsystem. The temperature measurement subsystem includes temperature sensor which is implemented by sixty-four thermocouple sensors to measure the key positions of cold room and hot room, and the temperature acquisition unit which adopts Agilent 34901A data acquisition card to achieve self-compensation and accurate temperature capture. The temperature control subsystem including temperature controller and compressor system is used to control the temperature between 0 degree to 20 degree for hot room and -20 degree to 0 degree for cold room. The hot room controller uses fuzzy control algorithm to achieve accurate control of temperature and the cold room controller firstly uses compressor to achieve coarse control and then uses more accurate temperature controller unit to obtain constant temperature(-20 degree). The heating power measurement is mainly to get the heat power of hot room heating devices. After above constant temperature environment is constructed, software of the test system is developed. Using software, temperature data and heat power data can be accurately got and then the heat transfer coefficient, representing the thermal insulating properties of doors and widows, is calculated using the standard formula. Experimental results show that the test system is simple, reliable and precise. It meets the testing requirements of national standard and has a good application prospect.
Software Support during a Control Room Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michele Joyce; Michael Spata; Thomas Oren
2005-09-21
In 2004, after 14 years of accelerator operations and commissioning, Jefferson Lab renovated its main control room. Changes in technology and lessons learned during those 14 years drove the control room redesign in a new direction, one that optimizes workflow and makes critical information and controls available to everyone in the control room. Fundamental changes in a variety of software applications were required to facilitate the new operating paradigm. A critical component of the new control room design is a large-format video wall that is used to make a variety of operating information available to everyone in the room. Analogmore » devices such as oscilloscopes and function generators are now displayed on the video wall through two crosspoint switchers: one for analog signals and another for video signals. A new software GUI replaces manual configuration of the oscilloscopes and function generators and helps automate setup. Monitoring screens, customized for the video wall, now make important operating information visible to everyone, not just a single operator. New alarm handler software gives any operator, on any workstation, access to all alarm handler functionality, and multiple users can now contribute to a single electronic logbook entry. To further support the shift to distributed access and control, many applications have been redesigned to run on servers instead of on individual workstations.« less
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
2014-04-25
CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...
5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...
83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
10. Credit BG. Interior of control and observation room at ...
10. Credit BG. Interior of control and observation room at Control and Recording Center Building 4221/E-22. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA
21 CFR 314.53 - Submission of patent information.
Code of Federal Regulations, 2014 CFR
2014-04-01
... pharmaceutical equivalence and comparable product stability; and (v) Comparative in vitro dissolution testing on... copy, to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug...
21 CFR 314.53 - Submission of patent information.
Code of Federal Regulations, 2012 CFR
2012-04-01
... pharmaceutical equivalence and comparable product stability; and (v) Comparative in vitro dissolution testing on... copy, to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug...
21 CFR 314.53 - Submission of patent information.
Code of Federal Regulations, 2013 CFR
2013-04-01
... pharmaceutical equivalence and comparable product stability; and (v) Comparative in vitro dissolution testing on... copy, to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug...
21 CFR 314.53 - Submission of patent information.
Code of Federal Regulations, 2010 CFR
2010-04-01
... pharmaceutical equivalence and comparable product stability; and (v) Comparative in vitro dissolution testing on... copy, to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug...
21 CFR 314.53 - Submission of patent information.
Code of Federal Regulations, 2011 CFR
2011-04-01
... pharmaceutical equivalence and comparable product stability; and (v) Comparative in vitro dissolution testing on... copy, to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug...
Nuclear reactor control room construction
Lamuro, R.C.; Orr, R.
1993-11-16
A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures.
Nuclear reactor control room construction
Lamuro, Robert C.; Orr, Richard
1993-01-01
A control room 10 for a nuclear plant is disclosed. In the control room, objects 12, 20, 22, 26, 30 are no less than four inches from walls 10.2. A ceiling 32 contains cooling fins 35 that extend downwards toward the floor from metal plates 34. A concrete slab 33 is poured over the plates. Studs 36 are welded to the plates and are encased in the concrete.
17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON ...
17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON LEFT, SIGNAL CONTROLS ON RIGHT, WHISTLE PULL TOP. RADIO TELEPHONE IN CENTER BACK (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Duru, Ilhan Cem; Laine, Pia; Andreevskaya, Margarita; Paulin, Lars; Kananen, Soila; Tynkkynen, Soile; Auvinen, Petri; Smolander, Olli-Pekka
2018-05-19
In Swiss-type cheeses, characteristic nut-like and sweet flavor develops during the cheese ripening due to the metabolic activities of cheese microbiota. Temperature changes during warm and cold room ripening, and duration of ripening can significantly change the gene expression of the cheese microbiota, which can affect the flavor formation. In this study, a metagenomic and metatranscriptomic analysis of Swiss-type Maasdam cheese was performed on samples obtained during ripening in the warm and cold rooms. We reconstructed four different bacterial genomes (Lactococcus lactis, Lactobacillus rhamnosus, Lactobacillus helveticus, and Propionibacterium freudenreichii subsp. shermanii strain JS) from the Maasdam cheese to near completeness. Based on the DNA and RNA mean coverage, Lc. lactis strongly dominated (~80-90%) within the cheese microbial community. Genome annotation showed the potential for the presence of several flavor forming pathways in these species, such as production of methanethiol, free fatty acids, acetoin, diacetyl, acetate, ethanol, and propionate. Using the metatranscriptomic data, we showed that, with the exception of Lc. lactis, the central metabolism of the microbiota was downregulated during cold room ripening suggesting that fewer flavor compounds such as acetoin and propionate were produced. In contrast, Lc. lactis genes related to the central metabolism, including the vitamin biosynthesis and homolactic fermentation, were upregulated during cold room ripening. Copyright © 2018 The Authors. Published by Elsevier B.V. All rights reserved.
Photographic art in exam rooms may reduce white coat hypertension.
Harper, Michael B; Kanayama-Trivedi, Stacy; Caldito, Gloria; Montgomery, David; Mayeaux, E J; DelRosso, Lourdes M
2015-12-01
Blood pressure (BP) elevation in medical office settings in patients who are normotensive in nonmedical settings is an effect known as 'white coat hypertension'. This phenomenon is thought to be due to situational anxiety caused by the experience of visiting a doctor and the anxiety-inducing nature of the medical office. Our study was designed to determine if carefully selected photographic art could counter the anxiety that causes white coat hypertension and lead to lower BP recordings in some patients. 117 adults, non-pregnant patients from the Louisiana State University Health Sciences Center Family Medicine Resident Clinic participated in this study. After the triage nurse measured the BP, the patients were randomly placed in either an exam room with standard medical posters (control room) or in an exam room with photographic art (photo room). The BP was measured in the exam room. After the medical visit, the patients switched rooms and the BP was measured a third time. The patients were asked to fill out a questionnaire to identify room preference. On average, the BP obtained in the control rooms was higher than that obtained in the photo rooms. There was a statistically significant difference between the mean arterial pressure, systolic BP and diastolic BP between the control room and the photo room. Landscape photographic art may have the beneficial effect of reducing BP in medical office examination rooms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
[Occupational exposure risk to body fluids in the Felix Bulnes Hospital during eleven years].
Villarroel, Julia; Bustamante, M Cecilia; Manríquez, Iván; Bertoglia, M Paz; Mora, María; Galarce, Natalie
2012-06-01
Accidents with risk of occupational exposure to body fluids constitute more of a third of labor accidents. To describe the annual incidence of accidents with exposure to body fluids in the Felix Bulnes Hospital from 1998 to 2008. A retrospective analysis of reports from the Infection Control Committee. During 11 years, there were 415 accidents with exposure to body fluids, with the cumulative incidence of 3,4% (range 1.3% to 6%). Sharp instrument accidents accounted for 92,5% of cases. The main health care providers affected were the paramedical technicians and the students. The highest frequency of accidents occurred in the obstetrical operating rooms (20%) and in the central operating rooms (17%). There were no cases of seroconversion and no exposure to HCV or HBV. The estimated costs were USD $35638,6 or USD $271 per 1000 staff per year. The incidence increased during the first years of the study and then remained stable since 2001, despite efforts in training personnel. Many factors contribute to the development of these accidents, such as lack of experience, type of clinical benefit and even daytime working hours.
Power in telephone-advice nursing.
Leppänen, Vesa
2010-03-01
Power is a central aspect of nursing, especially in telephone-advice nursing, where nurses assess callers' medical problems and decide what measures that need to be taken. This article presents a framework for understanding how power operates in social interaction between nurses and callers in telephone-advice nursing in primary care in Sweden. Power is analysed as the result of nurses and callers being oriented to five social structures that are relevant to their actions in this context, namely the organization of telephone-advice nursing, the social stock of medical knowledge, the professional division of labour between nurses and doctors, structures of social interaction and structures of emotions. While structural constraints govern some actions to a high degree, calls take place in an organizational free room that give nurses more leeway for acting more creatively. The discussion focuses on the introduction of new technologies of control, for instance computerized decision support systems and audio recording of calls, and on how they reduce the free room. Empirical data consist of 276 audio-recorded telephone calls to 13 nurses at six primary-care centres and of qualitative interviews with 18 nurses.
Buoyancy driven acceleration in a hospital operating room indoor environment
NASA Astrophysics Data System (ADS)
McNeill, James; Hertzberg, Jean; Zhai, John
2011-11-01
In hospital operating rooms, centrally located non-isothermal ceiling jets provide sterile air for protecting the surgical site from infectious particles in the room air as well as room cooling. Modern operating rooms are requiring larger temperature differences to accommodate increasing cooling loads for heat gains from medical equipment. This trend may lead to significant changes in the room air distribution patterns that may sacrifice the sterile air field across the surgical table. Quantitative flow visualization experiments using laser sheet illumination and RANS modeling of the indoor environment were conducted to demonstrate the impact of the indoor environment thermal conditions on the room air distribution. The angle of the jet shear layer was studied as function of the area of the vena contracta of the jet, which is in turn dependent upon the Archimedes number of the jet. Increases in the buoyancy forces cause greater air velocities in the vicinity of the surgical site increasing the likelihood of deposition of contaminants in the flow field. The outcome of this study shows the Archimedes number should be used as the design parameter for hospital operating room air distribution in order to maintain a proper supply air jet for covering the sterile region. This work is supported by ASHRAE.
Prevention of healthcare-associated infections in neonates: room for improvement.
Legeay, C; Bourigault, C; Lepelletier, D; Zahar, J R
2015-04-01
Infants in neonatal intensive care units (NICUs) are highly susceptible to infection due to the immaturity of their immune systems. Healthcare-associated infections (HCAIs) are associated with prolonged hospital stay, and represent a significant risk factor for neurological development problems and death. Improving HCAI control is a priority for NICUs. Many factors contribute to the occurrence of HCAIs in neonates such as poor hand hygiene, low nurse-infant ratios, environmental contamination and unnecessary use of antibiotics. Prevention is based on improving neonatal management, avoiding unnecessary use of central venous catheters, restricting use of antibiotics and H2 blockers, and introducing antifungal prophylaxis if necessary. Quality improvement interventions to reduce HCAIs in neonates seem to be the cornerstone of infection control. Copyright © 2015 The Healthcare Infection Society. Published by Elsevier Ltd. All rights reserved.
CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...
CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...
2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...
TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED ...
13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED BEHIND MANAGER'S ART DECO-STYLE CONTROL DESK, WITH CONTROL CUBICLE 1 AT FAR RIGHT AND CONTROL CUBICLE 9 AT FAR LEFT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA
11. Credit BG. Interior of control and observation room at ...
11. Credit BG. Interior of control and observation room at Control and Recording Center, showing detail of switchboard and closed circuit television monitors. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA
5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL ...
5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL HOUSE LOCATED ON THE SOUTH END OF BIG TUJUNGA DAM SHOWING THE CONTROL PANEL. - Big Tujunga Dam, Control House, 809 West Big Tujunga Road, Sunland, Los Angeles County, CA
Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial.
Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh
2015-05-01
One of the strategies for a good outcome and pain free childbearing is to design the delivery room. The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants' intervention vs. 66% of control participants had perinea laceration (P = 0.041). According to the findings of the present study, distracting senses in snoezelen room decreases mother's pain intensity, the length of labor, and incidence of episiotomy.
Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial
Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh
2015-01-01
Background: One of the strategies for a good outcome and pain free childbearing is to design the delivery room. Objectives: The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. Patients and Methods: This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. Results: The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants’ intervention vs. 66% of control participants had perinea laceration (P = 0.041). Conclusions: According to the findings of the present study, distracting senses in snoezelen room decreases mother’s pain intensity, the length of labor, and incidence of episiotomy. PMID:26082849
A simulator-based nuclear reactor emergency response training exercise.
Waller, Edward; Bereznai, George; Shaw, John; Chaput, Joseph; Lafortune, Jean-Francois
Training offsite emergency response personnel basic awareness of onsite control room operations during nuclear power plant emergency conditions was the primary objective of a week-long workshop conducted on a CANDU® virtual nuclear reactor simulator available at the University of Ontario Institute of Technology, Oshawa, Canada. The workshop was designed to examine both normal and abnormal reactor operating conditions, and to observe the conditions in the control room that may have impact on the subsequent offsite emergency response. The workshop was attended by participants from a number of countries encompassing diverse job functions related to nuclear emergency response. Objectives of the workshop were to provide opportunities for participants to act in the roles of control room personnel under different reactor operating scenarios, providing a unique experience for participants to interact with the simulator in real-time, and providing increased awareness of control room operations during accident conditions. The ability to "pause" the simulator during exercises allowed the instructors to evaluate and critique the performance of participants, and to provide context with respect to potential offsite emergency actions. Feedback from the participants highlighted (i) advantages of observing and participating "hands-on" with operational exercises, (ii) their general unfamiliarity with control room operational procedures and arrangements prior to the workshop, (iii) awareness of the vast quantity of detailed control room procedures for both normal and transient conditions, and (iv) appreciation of the increased workload for the operators in the control room during a transient from normal operations. Based upon participant feedback, it was determined that the objectives of the training had been met, and that future workshops should be conducted.
Pacific Pediatric Advanced Care Initiative
2010-10-01
cracked stopcock on the venous side c. Air introduced from medications infusing into the patient via a central venous line 6. After you have made sure...stopcock or pigtail. Withdraw volume to make venous pressures more negative History : Day 3 for a newborn infant with Group B sepsis. Eveything has...clinical laboratories, operating room, central supply, pharmacy, respiratory care, Neonatal Intensive Care Unit (NICU) nursing, Pediatric Intensive
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
46 CFR 151.25-2 - Cargo handling space.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...
12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. ...
12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING NORTH - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING EAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, ...
DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Tissue adhesives for closure of surgical incisions.
Coulthard, P; Worthington, H; Esposito, M; Elst, M; Waes, O J F
2004-01-01
Sutures, staples and adhesive tapes are the traditional methods of wound closure, whilst tissue adhesives have entered clinical practice more recently. Closure of wounds with sutures enables meticulous closure, but sutures may induce tissue reactivity and they usually require removal. Tissue adhesives offer the advantages there are no sutures to remove later for the patient and no risk of needlestick injury to the surgeon. Tissue adhesives have been used primarily in emergency rooms but this review looks at the use of tissue adhesives in the operating room where surgeons are increasingly using these for the closure of surgical skin incisions. To determine the relative effects of various tissue adhesives and conventional skin closure techniques on the healing of surgical wounds. The Cochrane Wounds Group Specialised Trials Register, The Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE and EMBASE were searched. Bibliographies of review articles were checked for studies outside the handsearched journals and wound care product manufacturers were contacted. Randomised controlled clinical trials only. Screening of eligible studies and data extraction was conducted independently and in triplicate whilst assessment of the methodological quality of the trials was conducted independently and in duplicate. Results were expressed as random effect models using weighted mean differences for continuous outcomes and relative risk with 95% confidence intervals for dichotomous outcomes. Heterogeneity was investigated including both clinical and methodological factors. Eight RCTs were included (630 patients). No statistically significant differences were found between various tissue adhesives and sutures (8 trials) for dehiscence, infection, satisfaction with cosmetic appearance when assessed by patients' or surgeons' general satisfaction. Nor were differences found between a tissue adhesive and tapes (2 trials) for infection, patients' assessment of cosmetic appearance, patient satisfaction or surgeon satisfaction. However a statistically significant difference was found for surgeons' assessment of cosmetic appearance with mean difference 13 (95%CI 5 to 21), the higher mean rating for the tissue adhesive group. Surgeons may consider the use of tissue adhesives as an alternative to sutures or adhesive tape for the closure of incisions in the operating room. There is a need for trials in all areas but in particular to include patients that require incision closure in areas of high tension and patients of general health that may impair wound healing.
IET control building (TAN620). control room. facing north. control consoles ...
IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...
MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
49 CFR 195.446 - Control room management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... written control room management procedures that implement the requirements of this section. The procedures... define the roles and responsibilities of a controller during normal, abnormal, and emergency operating... operator must define each of the following: (1) A controller's authority and responsibility to make...
24 CFR 3280.805 - Branch circuits required.
Code of Federal Regulations, 2014 CFR
2014-04-01
... room air conditioner, etc.). There shall be one or more circuits of adequate rating in accordance with...)(5). For central air conditioning, see Article 440 of the National Electrical Code, NFPA No. 70-2005...
Betty Petersen Memorial Library
NOAA logo - Click to go to the NOAA homepage Betty Petersen Memorial Library NOAA Library Logo / NOAA Central Library Betty Petersen Memorial Library 5830 University Research Court Room 1650, E / OC4
8. Historic American Buildings Survey Allen L. Hubbard, Photographer December ...
8. Historic American Buildings Survey Allen L. Hubbard, Photographer December 1, 1936 FIREPLACE (1st floor east central room) (kitchen) - Fort Western, Main Building, Bowman Street, Augusta, Kennebec County, ME
5. Historic American Buildings Survey Josiah T. Tubby, Photographer December ...
5. Historic American Buildings Survey Josiah T. Tubby, Photographer December 1, 1936 NORTH CENTRAL ROOM 1ST FLOOR (west wall) - Fort Western, Main Building, Bowman Street, Augusta, Kennebec County, ME
Substation alarm multiplexing system (SAMS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
ElBadaly, H.; Gaughan, J.; Ward, G.
1996-03-01
This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creekmore » substation in the Bronx for the purpose of a three month field evaluation.« less
1. VIEW OF THE WEST ELEVATION, LOOKING EAST, OF BUILDING ...
1. VIEW OF THE WEST ELEVATION, LOOKING EAST, OF BUILDING 886 WHILE UNDER CONSTRUCTION IN 1964. ON THE RIGHT OF THE PHOTOGRAPH IS THE CRITICALITY ASSEMBLY ROOM, ROOM 101, CONSTRUCTED OF DOUBLE REINFORCED CONCRETE WALLS INTEGRALLY CAST TO THE TWO FEET THICK CEILING. IN THE FOREGROUND, IS THE 19' FEET DEEP PIT AREA INTENDED TO HOUSE WASTE SOLUTION STORAGE TANKS. ONLY ONE TANK WAS USED, TO STORE WASTEWATER. - Rocky Flats Plant, Critical Mass Laboratory, Intersection of Central Avenue & 86 Drive, Golden, Jefferson County, CO
Strength evaluation test of pressureless-sintered silicon nitride at room temperature
NASA Technical Reports Server (NTRS)
Matsusue, K.; Takahara, K.; Hashimoto, R.
1984-01-01
In order to study strength characteristics at room temperature and the strength evaluating method of ceramic materials, the following tests were conducted on pressureless sintered silicon nitride specimens: bending tests, the three tensile tests of rectangular plates, holed plates, and notched plates, and spin tests of centrally holed disks. The relationship between the mean strength of specimens and the effective volume of specimens are examined using Weibull's theory. The effect of surface grinding on the strength of specimens is discussed.
An intervention for noise control of blast furnace in steel industry.
Golmohammadi, Rostam; Giahi, Omid; Aliabadi, Mohsen; Darvishi, Ebrahim
2014-01-01
Noise pollution is currently a major health risk factor for workers in industries. The aim of this study was to investigate noise pollution and implement a control intervention plan for blast furnace in a steel industry. The measurement of sound pressure level (SPL) along with frequency analysis was done with the sound-level-meter Cell-450. Personal noise exposure was performed using dosimeter TES-1345 calibrated with CEL-282. Before planning noise controls, acoustic insulation properties of the furnace control unit and workers' rest room were assessed. Control room and workers' rest room were redesigned in order to improve acoustical condition. The SPL before intervention around the Blast Furnace was 90.3 dB (L) and its dominant frequency was 4000 Hz. Besides, noise transmission loss of the control and rest rooms were 10.3 dB and 4.2 dB, respectively. After intervention, noise reduction rates in the control and rest rooms were 27.4 dB and 27.7 dB, respectively. The workers' noise dose before and after the intervention was 240% and less than 100%, respectively. Improvement the workroom acoustic conditions through noise insulation can be considered effective method for preventing workers exposure to harmful noise.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dagle, J.E.
1992-09-01
The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less
27. Pump Room interiorDrainage pump motor control center with main ...
27. Pump Room interior-Drainage pump motor control center with main valve control panel at right. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA
31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL ...
31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL ...
30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
Front view of bldg 30 which houses mission control
NASA Technical Reports Server (NTRS)
1984-01-01
Front view of bldg 30 which houses mission control. A shift change for the 41-D mission is underway. The windowless wing at left houses three floors, including rooms supporting flight control room 1 and 2.
11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...
11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...
12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
Kaletsch, U; Kaatsch, P; Meinert, R; Schüz, J; Czarwinski, R; Michaelis, J
1999-09-01
A population-based case-control study on risk factors for childhood malignancies was used to investigate a previously reported association between elevated indoor radon concentrations and childhood cancer, with special regard to leukaemia. The patients were all children suffering from leukaemia and common solid tumours (nephroblastoma, neuroblastoma, rhabdomyosarcoma, central nervous system (CNS) tumours) diagnosed between July 1988 and June 1993 in Lower Saxony (Germany) and aged less than 15 years. Two population-based control groups were matched by age and gender to the leukaemia patients. Long-term (1 year) radon measurements were performed in those homes where the children had been living for at least 1 year, with particular attention being paid to those rooms where they had stayed most of the time. Due to the sequential study design, radon measurements in these rooms could only be done for 36% (82 leukaemias, 82 solid tumours and 209 controls) of the 1038 families initially contacted. Overall mean indoor radon concentrations (27 Bq m(-3)) were low compared with the measured levels in other studies. Using a prespecified cutpoint of 70 Bq m(-3), no association with indoor radon concentrations was seen for the leukaemias (odds ratio (OR): 1.30; 95% confidence interval (95% CI): 0.32-5.33); however, the risk estimates were elevated for the solid tumours (OR: 2.61; 95% CI: 0.96-7.13), mainly based on 6 CNS tumours. We did not find any evidence for an association between indoor radon and childhood leukaemia, which is in line with a recently published American case-control study. There is little support for an association with CNS tumours in the literature.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, T. M.; Wilke, R. J.; Roberts, T.
Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building. The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference. Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test. The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, T. M.; Wilke, R. J.; Roberts, T.
Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building.The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference.Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test.The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less
49. Environmental equipment room, cbr filter at left, ventilation control ...
49. Environmental equipment room, cbr filter at left, ventilation control panel in center, brine chiller controls at right, looking southeast - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD
Documentation of new mission control center White Flight Control Room (FLCR)
1995-06-06
Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).
An integrated system for dynamic control of auditory perspective in a multichannel sound field
NASA Astrophysics Data System (ADS)
Corey, Jason Andrew
An integrated system providing dynamic control of sound source azimuth, distance and proximity to a room boundary within a simulated acoustic space is proposed for use in multichannel music and film sound production. The system has been investigated, implemented, and psychoacoustically tested within the ITU-R BS.775 recommended five-channel (3/2) loudspeaker layout. The work brings together physical and perceptual models of room simulation to allow dynamic placement of virtual sound sources at any location of a simulated space within the horizontal plane. The control system incorporates a number of modules including simulated room modes, "fuzzy" sources, and tracking early reflections, whose parameters are dynamically changed according to sound source location within the simulated space. The control functions of the basic elements, derived from theories of perception of a source in a real room, have been carefully tuned to provide efficient, effective, and intuitive control of a sound source's perceived location. Seven formal listening tests were conducted to evaluate the effectiveness of the algorithm design choices. The tests evaluated: (1) loudness calibration of multichannel sound images; (2) the effectiveness of distance control; (3) the resolution of distance control provided by the system; (4) the effectiveness of the proposed system when compared to a commercially available multichannel room simulation system in terms of control of source distance and proximity to a room boundary; (5) the role of tracking early reflection patterns on the perception of sound source distance; (6) the role of tracking early reflection patterns on the perception of lateral phantom images. The listening tests confirm the effectiveness of the system for control of perceived sound source distance, proximity to room boundaries, and azimuth, through fine, dynamic adjustment of parameters according to source location. All of the parameters are grouped and controlled together to create a perceptually strong impression of source location and movement within a simulated space.
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
2014-04-03
CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky
Archibald, Lennox K; Pallangyo, Kisali; Kazembe, Peter; Reller, L Barth
2006-12-01
We conducted retrospective, comparative analyses of contamination rates for cultures of blood obtained in the emergency rooms of Muhimbili National Hospital (MNH) in Dar es Salaam, Tanzania; Lilongwe Central Hospital (LCH) in central Malawi; and the Duke University Medical Center (DUMC) in the United States. None of the emergency room patients had indwelling intravascular devices at the time that the blood samples for cultures were obtained. In addition, we reviewed the contamination rates for a cohort of patients already hospitalized in the DUMC inpatient medical service, most of whom had indwelling intravascular devices. The bloodstream infection rates among the patients at MNH (n=513) and LCH (n=486) were similar (approximately 28%); the contamination rates at the two hospitals were 1.3% (7/513) and 0.8% (4/486), respectively. Of 54 microorganisms isolated from cultures of blood collected in the DUMC emergency room, 26 (48%) were identified as skin contaminants. Cultures of blood collected in the DUMC emergency room were significantly more likely to yield growth of contaminants than the cultures of blood collected in the emergency rooms at MNH and LCH combined (26/332 versus 11/1,003; P<0.0001) or collected in the DUMC inpatient medical service (26/332 versus 7/283; P<0.01). For the MNH and LCH blood cultures, lower contamination rates were observed when skin was disinfected with isopropyl alcohol plus tincture of iodine rather than isopropyl alcohol plus povidone-iodine. In conclusion, blood culture contamination was minimized in sub-Saharan African hospitals with substantially limited resources through scrupulous attention to aseptic skin cleansing and improved venipuncture techniques. Application of these principles when blood samples for culture are obtained in U.S. hospital emergency rooms should help mitigate blood culture contamination rates and the unnecessary microbiology workup of skin contaminants.
An Informationally Structured Room for Robotic Assistance †
Tsuji, Tokuo; Mozos, Oscar Martinez; Chae, Hyunuk; Pyo, Yoonseok; Kusaka, Kazuya; Hasegawa, Tsutomu; Morooka, Ken'ichi; Kurazume, Ryo
2015-01-01
The application of assistive technologies for elderly people is one of the most promising and interesting scenarios for intelligent technologies in the present and near future. Moreover, the improvement of the quality of life for the elderly is one of the first priorities in modern countries and societies. In this work, we present an informationally structured room that is aimed at supporting the daily life activities of elderly people. This room integrates different sensor modalities in a natural and non-invasive way inside the environment. The information gathered by the sensors is processed and sent to a centralized management system, which makes it available to a service robot assisting the people. One important restriction of our intelligent room is reducing as much as possible any interference with daily activities. Finally, this paper presents several experiments and situations using our intelligent environment in cooperation with our service robot. PMID:25912347
11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along ...
11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along west wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND ...
29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND VIEWING WINDOW IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV
8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...
8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO
6. Historic American Buildings Survey James Rainey, Photographer May 7, ...
6. Historic American Buildings Survey James Rainey, Photographer May 7, 1936 STAIRS FROM ROOM OF SECRETARY OF STATE SECOND FLOOR (Looking North) - Old State House, Main Street & Central Row, Hartford, Hartford County, CT
36 CFR 1253.1 - National Archives Building.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Hours for the Research Center and the Central Research Room are posted at http://www.archives.gov. The exhibit areas' hours of operation are also posted at http://www.archives.gov. Last admission to the...
36 CFR 1253.1 - National Archives Building.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... Hours for the Research Center and the Central Research Room are posted at http://www.archives.gov. The exhibit areas' hours of operation are also posted at http://www.archives.gov. Last admission to the...
36 CFR 1253.1 - National Archives Building.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Hours for the Research Center and the Central Research Room are posted at http://www.archives.gov. The exhibit areas' hours of operation are also posted at http://www.archives.gov. Last admission to the...
Freight 2055 : roundtable discussion.
DOT National Transportation Integrated Search
2015-07-08
JULY 8, 2015 : North Central Texas Council of Governments : Transportation Council Room : 616 Six Flags Drive, Arlington, TX 76011 : The Texas A&M Transportation Institute (TTI) and the Center for Transportation Research (CTR) invite you to a Roundta...
36 CFR § 1253.1 - National Archives Building.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DC 20408. Hours for the Research Center and the Central Research Room are posted at http://www.archives.gov. The exhibit areas' hours of operation are also posted at http://www.archives.gov. Last...
Pacific Pediatric Advanced Care Initiative
2011-01-01
infusing into the patient via a central venous line 6. After you have made sure the patient is safe, remove air from system. 7. Identify and fix...site. Push blood. Take fluid out of bladder to create a more negative venous pressure History : Day 1 for a 2 month old who had a witnessed...operating room, central supply, pharmacy, respiratory care, Neonatal Intensive Care Unit (NICU) nursing, Pediatric Intensive Care Unit (PICU) nursing, Risk
LOFT. Interior, control room in control building (TAN630). Camera facing ...
LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...
14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA
Information Foraging in Nuclear Power Plant Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
R.L. Boring
2011-09-01
nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators tomore » appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacques Hugo; Ronald Boring; Lew Hanes
2013-09-01
The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less
6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape ...
6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape tunnel. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner ...
7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner and entrance to cable tunnel. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
10 CFR 36.23 - Access control.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...
Wide angle view of the Flight control room of Mission control center
1984-10-06
Wide angle view of the flight control room (FCR) of the Mission Control Center (MCC). Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.
Gauthier, Philippe-Aubert; Berry, Alain; Woszczyk, Wieslaw
2005-02-01
This paper describes the simulations and results obtained when applying optimal control to progressive sound-field reproduction (mainly for audio applications) over an area using multiple monopole loudspeakers. The model simulates a reproduction system that operates either in free field or in a closed space approaching a typical listening room, and is based on optimal control in the frequency domain. This rather simple approach is chosen for the purpose of physical investigation, especially in terms of sensing microphones and reproduction loudspeakers configurations. Other issues of interest concern the comparison with wave-field synthesis and the control mechanisms. The results suggest that in-room reproduction of sound field using active control can be achieved with a residual normalized squared error significantly lower than open-loop wave-field synthesis in the same situation. Active reproduction techniques have the advantage of automatically compensating for the room's natural dynamics. For the considered cases, the simulations show that optimal control results are not sensitive (in terms of reproduction error) to wall absorption in the reproduction room. A special surrounding configuration of sensors is introduced for a sensor-free listening area in free field.
Lutein facilitates physiological revascularization in a mouse model of retinopathy of prematurity.
Fu, Zhongjie; Meng, Steven S; Burnim, Samuel B; Smith, Lois Eh; Lo, Amy Cy
2017-07-01
Retinopathy of prematurity is one of the leading causes of childhood blindness worldwide, with vessel growth cessation and vessel loss in phase I followed by neovascularization in phase II. Ischaemia contributes to its pathogenesis, and lutein protects against ischaemia-induced retinal damages. We aimed to investigate the effects of lutein on a murine model of oxygen-induced retinopathy. Mouse pups were exposed to 75% oxygen for 5 days and returned to room air for another 5 days. Vascular obliteration, neovascularization and blood vessel leakage were examined. Immunohistochemistry for glial cells and microglia were performed. Compared with vehicle controls, mouse pups receiving lutein treatment displayed smaller central vaso-obliterated area and reduced blood vessel leakage. No significant difference in neovascular area was found between lutein and vehicle controls. Lutein promoted endothelial tip cell formation and maintained the astrocytic template in the avascular area in oxygen-induced retinopathy. No significant changes in Müller cell gliosis and microglial activation in the central avascular area were found in lutein-treated pups. Our observations indicated that lutein significantly promoted normal retinal vascular regrowth in the central avascular area, possibly through promoting endothelial tip cell formation and preserving astrocytic template. Our results indicated that lutein might be considered as a supplement for the treatment of proliferative retinopathy of prematurity because of its role in facilitating the revascularization of normal vasculature. © 2016 Royal Australian and New Zealand College of Ophthalmologists.
Gonzalez, Chris M; Jang, Tom; Raines, Melanie; Lys, Thomas Z; Schaeffer, Anthony J
2006-07-01
Cost containment in the office is becoming more important secondary to increasing overhead costs and lower reimbursement. In an attempt to limit these particular expenditures we analyzed and restructured our methods of ordering, storing and distributing office supply inventory. In a large academic practice with 11 urologists and approximately 20,000 annual patient visits an attempt was made to decrease overhead costs using the principle of just in time inventory popularized by large manufacturing companies. We initially issued a return of excess and/or unused supplies from our office inventory stock room. Our main supply room was then centralized to contain office supplies for up to 4 weeks. The 12 individual clinic rooms were stocked with appropriate supplies to last 1 week. Limited access to the main supply room was established and a supply manager was established to log all input and output. The initial credit for the return of unused/overstocked supplies was $10,107 in January 2004. Annual office supply charges in calendar year 2004 were $87,444 compared to charges in calendar year 2003 of $175,340. No stock outs occurred during year 2004 and all standing delivery orders were terminated. The total number of patient visits in calendar year 2004 was 20,170 compared to 19,455 in calendar year 2003. Decreasing overall inventory through accurate demand forecasting, judicious accounting, office supply centralization and just in time ordering is a potential area for significant overhead cost savings in a clinical practice.
Microcontroller based automatic temperature control for oyster mushroom plants
NASA Astrophysics Data System (ADS)
Sihombing, P.; Astuti, T. P.; Herriyance; Sitompul, D.
2018-03-01
In the cultivation of Oyster Mushrooms need special treatment because oyster mushrooms are susceptible to disease. Mushroom growth will be inhibited if the temperature and humidity are not well controlled because temperature and inertia can affect mold growth. Oyster mushroom growth usually will be optimal at temperatures around 22-28°C and humidity around 70-90%. This problem is often encountered in the cultivation of oyster mushrooms. Therefore it is very important to control the temperature and humidity of the room of oyster mushroom cultivation. In this paper, we developed an automatic temperature monitoring tool in the cultivation of oyster mushroom-based Arduino Uno microcontroller. We have designed a tool that will control the temperature and humidity automatically by Android Smartphone. If the temperature increased more than 28°C in the room of mushroom plants, then this tool will turn on the pump automatically to run water in order to lower the room temperature. And if the room temperature of mushroom plants below of 22°C, then the light will be turned on in order to heat the room. Thus the temperature in the room oyster mushrooms will remain stable so that the growth of oyster mushrooms can grow with good quality.
Wang, Lei; Cai, Xuquan; Xu, Yijuan
2015-01-01
The recent resurgence of bed bugs (Cimex spp.) in many developed countries has drawn increasing attention worldwide. The status of urban bed bug infestations were investigated in Shenzhen and Dongguan, two major cities in southern Guangdong Province of southern China, based on pest control service records from two different companies (one during 2012 and another during 2013). The results showed that Shenzhen and Dongguan have a severe problem with bed bug infestations: the control of bed bugs is a constant concern, except during the winter. In Shenzhen, a similar number of premises were treated for bed bugs in central business districts and suburban districts. However, in Dongguan, more premises were treated for bed bugs in suburban districts than in central business districts. The treatment rate for worker sleeping quarters, apartments, hotel, and private houses in Shenzhen was 53.8, 43.0, 1.9, and 1.3%, respectively. The percentage of treated rooms was 56.1% for worker sleeping quarters and 91.1% for apartments. In Dongguan, the treatment rate for worker sleeping quarters, apartments, hotel, and private houses was 90.0, 10.0, 0.0, and 0.0%, respectively. © The Authors 2015. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Rogge, G D; Viana, A M; Randi, A M
2000-01-01
Spores of Dicksonia sellowiana (Presl.) Hook., an endangered tree fern, were stored in liquid nitrogen. Surface sterilized spores were placed in 1 ml sterile polypropylene cryotubes and were plunged into liquid nitrogen cryo-cans for 15 minutes, 15 days, 1 month and 3 months. In all, of the treatments the percentage of germination was higher than the control (fresh spores). Germination in Dyer and MS media supplement with 10 (-7) M and 5 x 10(-7) M BA was also promoted as comparing to control. There was no difference between the germination of spores thawed rapidly in a water bath at 45 degree C during 5 minutes or slowly at room temperature. Cryopreservation seems to promote germination of some dormant spores of D. sellowiana. The pre-treatment in cryoprotective solution of dimethyl sulphoxide 15%(v/v) in 1 M glycerol inhibited the germination of cryopreserved spores
The influence of para-seismic vibrations, induced by blasting works, on structures: a Case Study
NASA Astrophysics Data System (ADS)
Andrusikiewicz, Wacław
2018-04-01
Underground mining operations are often associated with the necessity to use explosives. Several hundreds of kilograms of explosives, subdivided into small charges suitable for a specific mining job, are used each time in a blasting operation. In many cases, mining engineers carry out remote central blasting works, which means that all the charges placed at faces are initiated from one control point (usually, a control room in the mine) at the same time. Such coordinated explosions generate para-seismic movements whose consequences can be felt on land surface, with subsequent effects identified in buildings and structures. This paper discusses briefly selected standards applicable to the harmful para-seismic impacts. The author presents the results of the research conducted with the intention to identify harmful effects of the basting works carried out in the "Kłodawa" Salt Mine.
Zhao, Hong-Quan; Kasai, Seiya; Shiratori, Yuta; Hashizume, Tamotsu
2009-06-17
A two-bit arithmetic logic unit (ALU) was successfully fabricated on a GaAs-based regular nanowire network with hexagonal topology. This fundamental building block of central processing units can be implemented on a regular nanowire network structure with simple circuit architecture based on graphical representation of logic functions using a binary decision diagram and topology control of the graph. The four-instruction ALU was designed by integrating subgraphs representing each instruction, and the circuitry was implemented by transferring the logical graph structure to a GaAs-based nanowire network formed by electron beam lithography and wet chemical etching. A path switching function was implemented in nodes by Schottky wrap gate control of nanowires. The fabricated circuit integrating 32 node devices exhibits the correct output waveforms at room temperature allowing for threshold voltage variation.
STS-109 Flight Control Room Photo
2002-03-05
JSC2002-00575 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.
STS-109 Flight Control Room Photo
2002-03-05
JSC2002-00576 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houstons Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.
Partial Section Through Stack, Water Tank, and Privy; Plan ...
Partial Section Through Stack, Water Tank, and Privy; Plan - Stack, Privies, & Changing Rooms; Elevation - Central of Georgia Railway, Savannah Repair Shops & Terminal Facilities, Bounded by West Broad, Jones, West Boundary & Hull Streets, Savannah, Chatham County, GA
26. A typical outer rod room, or rack room, showing ...
26. A typical outer rod room, or rack room, showing the racks for the nine horizontal control rods (HCRs) that would be inserted or withdrawn from the pile to control the rate of reaction. In this case, it is the 105-F Reactor in February 1945. The view is looking away from the pile, which is out of the picture on the left. Several of the cooling water hose reels for the rods can be seen at the end of the racks near the wall. D-8323 - B Reactor, Richland, Benton County, WA
Power system distributed oscilation detection based on Synchrophasor data
NASA Astrophysics Data System (ADS)
Ning, Jiawei
Along with increasing demand for electricity, integration of renewable energy and deregulation of power market, power industry is facing unprecedented challenges nowadays. Within the last couple of decades, several serious blackouts have been taking place in United States. As an effective approach to prevent that, power system small signal stability monitoring has been drawing more interests and attentions from researchers. With wide-spread implementation of Synchrophasors around the world in the last decade, power systems real-time online monitoring becomes much more feasible. Comparing with planning study analysis, real-time online monitoring would benefit control room operators immediately and directly. Among all online monitoring methods, Oscillation Modal Analysis (OMA), a modal identification method based on routine measurement data where the input is unmeasured ambient excitation, is a great tool to evaluate and monitor power system small signal stability. Indeed, high sampling Synchrophasor data around power system is fitted perfectly as inputs to OMA. Existing methods in OMA for power systems are all based on centralized algorithms applying at control centers only; however, with rapid growing number of online Synchrophasors the computation burden at control centers is and will be continually exponentially expanded. The increasing computation time at control center compromises the real-time feature of online monitoring. The communication efforts between substation and control center will also be out of reach. Meanwhile, it is difficult or even impossible for centralized algorithms to detect some poorly damped local modes. In order to avert previous shortcomings of centralized OMA methods and embrace the new changes in the power systems, two new distributed oscillation detection methods with two new decentralized structures are presented in this dissertation. Since the new schemes brought substations into the big oscillation detection picture, the proposed methods could achieve faster and more reliable results. Subsequently, this claim is tested and approved by test results of IEEE Two-area simulation test system and real power system historian synchrophasor data case studies.
Manchikanti, Laxmaiah; Cash, Kimberly A; McManus, Carla D; Pampati, Vidyasagar
2013-01-01
Chronic persistent low back and lower extremity pain secondary to central spinal stenosis is common and disabling. Lumbar surgical interventions with decompression or fusion are most commonly performed to manage severe spinal stenosis. However, epidural injections are also frequently performed in managing central spinal stenosis. After failure of epidural steroid injections, the next sequential step is percutaneous adhesiolysis and hypertonic saline neurolysis with a targeted delivery. The literature on the effectiveness of percutaneous adhesiolysis in managing central spinal stenosis after failure of epidural injections has not been widely studied. A prospective evaluation. An interventional pain management practice, a specialty referral center, a private practice setting in the United States. To evaluate the effectiveness of percutaneous epidural adhesiolysis in patients with chronic low back and lower extremity pain with lumbar central spinal stenosis. Seventy patients were recruited. The initial phase of the study was randomized, double-blind with a comparison of percutaneous adhesiolysis with caudal epidural injections. The 25 patients from the adhesiolysis group continued with follow-up, along with 45 additional patients, leading to a total of 70 patients. All patients received percutaneous adhesiolysis and appropriate placement of the Racz catheter, followed by an injection of 5 mL of 2% preservative-free lidocaine with subsequent monitoring in the recovery room. In the recovery room, each patient also received 6 mL of 10% hypertonic sodium chloride solution, and 6 mg of non-particulate betamethasone, followed by an injection of 1 mL of sodium chloride solution and removal of the catheter. Multiple outcome measures were utilized including the Numeric Rating Scale (NRS), the Oswestry Disability Index 2.0 (ODI), employment status, and opioid intake with assessment at 3, 6, and 12, 18 and 24 months post treatment. The primary outcome measure was 50% or more improvement in pain scores and ODI scores. Overall, a primary outcome or significant pain relief and functional status improvement of 50% or more was seen in 71% of patients at the end of 2 years. The overall number of procedures over a period of 2 years were 5.7 ± 2.73. The lack of a control group and a prospective design. Significant relief and functional status improvement as seen in 71% of the 70 patients with percutaneous adhesiolysis utilizing local anesthetic steroids and hypertonic sodium chloride solution may be an effective management strategy in patients with chronic function limiting low back and lower extremity pain with central spinal stenosis after failure of conservatie management and fluoroscopically directed epidural injections.
Closed-Loop Acoustic Control of Reverberant Room for Satellite Environmental Testing
NASA Astrophysics Data System (ADS)
Janssens, Karl; Bianciardi, Fabio; Sabbatini, Danilo; Debille, Jan; Carrella, Alex
2012-07-01
The full satellite acoustic test is an important milestone in a satellite launch survivability verification campaign. This test is required to verify the satellite’s mechanical design against the high-level acoustic loads induced by the launch vehicle during the atmospheric flight. During the test, the satellite is subjected to a broadband diffuse acoustic field, reproducing the pressure levels observed during launch. The excitation is in most cases provided by a combination of horns for the low frequencies and noise generators for the higher frequencies. Acoustic control tests are commonly performed in reverberant rooms, controlling the sound pressure levels in third octave bands over the specified target spectrum. This paper discusses an automatic feedback control system for acoustic control of large reverberation rooms for satellite environmental testing. The acoustic control system consists of parallel third octave PI (Proportional Integral) feedback controllers that take the reverberation characteristics of the room into consideration. The drive output of the control system is shaped at every control step based on the comparison of the average third octave noise spectrum, measured from a number of microphones in the test room, with the target spectrum. Cross-over filters split the output drive into band- limited signals to feed each of the horns. The control system is realized in several steps. In the first phase, a dynamic process model is developed, including the non-linear characteristics of the horns and the reverberant properties of the room. The model is identified from dynamic experiments using system identification techniques. In the next phase, an adequate control strategy is designed which is capable of reaching the target spectrum in the required time period without overshoots. This control strategy is obtained from model-in-the-loop (MIL) simulations, evaluating the performance of various potential strategies. Finally, the proposed strategy is implemented in real-time and its control performance tested and validated.
Clean room survey and assessment, volume 5, appendix H
NASA Technical Reports Server (NTRS)
1991-01-01
The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.
Human factors aspects of control room design
NASA Technical Reports Server (NTRS)
Jenkins, J. P.
1983-01-01
A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.
IET. Control room in control building (TAN620). Terminal panels for ...
IET. Control room in control building (TAN-620). Terminal panels for instrumentation wiring. Note alarm horn and emergency light at right edge of view. Cable reel comes from Collier, Pawtucket, RI. Date: February 1955. INEEL negative no. 55-362 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Guidelines on ergonomic aspects of control rooms
NASA Technical Reports Server (NTRS)
Mitchell, C. M.; Bocast, A. K.; Stewart, L. J.
1983-01-01
The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.
Report #12-P-0879, September 26, 2012. The security posture and in-place environmental control review of the computer rooms in the Ariel Rios and Potomac Yard buildings revealed numerous security and environmental control deficiencies.
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...
20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
The heat is on: room temperature affects laboratory equipment--an observational study.
Butler, Julia M; Johnson, Jane E; Boone, William R
2013-10-01
To evaluate the effect of ambient room temperature on equipment typically used in in vitro fertilization (IVF). We set the control temperature of the room to 20 °C (+/-0.3) and used CIMScan probes to record temperatures of the following equipment: six microscope heating stages, four incubators, five slide warmers and three heating blocks. We then increased the room temperature to 26 °C (+/-0.3) or decreased it to 17 °C (+/-0.3) and monitored the same equipment again. We wanted to determine what role, if any, changing room temperature has on equipment temperature fluctuation. There was a direct relationship between room temperature and equipment temperature stability. When room temperature increased or decreased, equipment temperature reacted in a corresponding manner. Statistical differences between equipment were found when the room temperature changed. What is also noteworthy is that temperature of equipment responded within 5 min to a change in room temperature. Clearly, it is necessary to be aware of the affect of room temperature on equipment when performing assisted reproductive procedures. Room and equipment temperatures should be monitored faithfully and adjusted as frequently as needed, so that consistent culture conditions can be maintained. If more stringent temperature control can be achieved, human assisted reproduction success rates may improve.
2009-05-06
CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
2009-05-06
CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...
37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
46 CFR 154.1200 - Mechanical ventilation system: General.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...
Warming of intravenous and irrigation fluids for preventing inadvertent perioperative hypothermia.
Campbell, Gillian; Alderson, Phil; Smith, Andrew F; Warttig, Sheryl
2015-04-13
Inadvertent perioperative hypothermia (a drop in core temperature to below 36°C) occurs because of interference with normal temperature regulation by anaesthetic drugs, exposure of skin for prolonged periods and receipt of large volumes of intravenous and irrigation fluids. If the temperature of these fluids is below core body temperature, they can cause significant heat loss. Warming intravenous and irrigation fluids to core body temperature or above might prevent some of this heat loss and subsequent hypothermia. To estimate the effectiveness of preoperative or intraoperative warming, or both, of intravenous and irrigation fluids in preventing perioperative hypothermia and its complications during surgery in adults. We searched the Cochrane Central Register of Controlled Trials (CENTRAL) (2014, Issue 2), MEDLINE Ovid SP (1956 to 4 February 2014), EMBASE Ovid SP (1982 to 4 February 2014), the Institute for Scientific Information (ISI) Web of Science (1950 to 4 February 2014), Cumulative Index to Nursing and Allied Health Literature (CINAHL) EBSCOhost (1980 to 4 February 2014) and reference lists of identified articles. We also searched the Current Controlled Trials website and ClinicalTrials.gov. We included randomized controlled trials or quasi-randomized controlled trials comparing fluid warming methods versus standard care or versus other warming methods used to maintain normothermia. Two review authors independently extracted data from eligible trials and settled disputes with a third review author. We contacted study authors to ask for additional details when needed. We collected data on adverse events only if they were reported in the trials. We included in this review 24 studies with a total of 1250 participants. The trials included various numbers and types of participants. Investigators used a range of methods to warm fluids to temperatures between 37°C and 41°C. We found that evidence was of moderate quality because descriptions of trial design were often unclear, resulting in high or unclear risk of bias due to inappropriate or unclear randomization and blinding procedures. These factors may have influenced results in some way. Our protocol specified the risk of hypothermia as the primary outcome; as no trials reported this, we decided to include data related to mean core temperature. The only secondary outcome reported in the trials that provided useable data was shivering. Evidence was unclear regarding the effects of fluid warming on bleeding. No data were reported on our other specified outcomes of cardiovascular complications, infection, pressure ulcers, bleeding, mortality, length of stay, unplanned intensive care admission and adverse events.Researchers found that warmed intravenous fluids kept the core temperature of study participants about half a degree warmer than that of participants given room temperature intravenous fluids at 30, 60, 90 and 120 minutes, and at the end of surgery. Warmed intravenous fluids also further reduced the risk of shivering compared with room temperature intravenous fluidsInvestigators reported no statistically significant differences in core body temperature or shivering between individuals given warmed and room temperature irrigation fluids. Warm intravenous fluids appear to keep patients warmer during surgery than room temperature fluids. It is unclear whether the actual differences in temperature are clinically meaningful, or if other benefits or harms are associated with the use of warmed fluids. It is also unclear if using fluid warming in addition to other warming methods confers any benefit, as a ceiling effect is likely when multiple methods of warming are used.
4. VIEW OF ROOM 103 IN 1980. SIX OF THE ...
4. VIEW OF ROOM 103 IN 1980. SIX OF THE NINE URANIUM NITRATE STORAGE TANKS ARE SHOWN. HIGHLY ENRICHED URANIUM WAS INTRODUCED INTO THE BUILDING IN THE SUMMER OF 1965 AND THE FIRST EXPERIMENTS WERE PERFORMED IN SEPTEMBER OF 1965. EXPERIMENTS WERE PERFORMED ON ENRICHED URANIUM METAL AND SOLUTION, PLUTONIUM METAL, LOW ENRICHED URANIUM OXIDE, AND SEVERAL SPECIAL APPLICATIONS. AFTER 1983, EXPERIMENTS WERE CONDUCTED PRIMARILY WITH URANYL NITRATE SOLUTIONS, AND DID NOT INVOLVE SOLID MATERIALS. - Rocky Flats Plant, Critical Mass Laboratory, Intersection of Central Avenue & 86 Drive, Golden, Jefferson County, CO
[Justifying measures to correct functional state of operators varying in personal anxiety].
2012-01-01
Workers of operating and dispatching occupations are exposed to high nervous and emotional exertion that result in increased personal anxiety, working stress and overstrain. That requires physiologically justified correction of hazardous psycho-physiologic states via various prophylactic measures (stay in schungite room, autogenous training, central electric analgesia, electric acupuncture). Attempted relaxation sessions in schungite room revealed in highly anxious individuals an increased velocity of visual signals perception, of attention concentration and shifting. Autogenous training sessions improve memory and have significant hypotensive effect in highly anxious individuals.
Impact of animal-assisted therapy for outpatients with fibromyalgia.
Marcus, Dawn A; Bernstein, Cheryl D; Constantin, Janet M; Kunkel, Frank A; Breuer, Paula; Hanlon, Raymond B
2013-01-01
Animal-assisted therapy using dogs trained to be calm and provide comfort to strangers has been used as a complementary therapy for a range of medical conditions. This study was designed to evaluate the effects of brief therapy dog visits for fibromyalgia patients attending a tertiary outpatient pain management facility compared with time spent in a waiting room. Open label with waiting room control. Tertiary care, university-based, outpatient pain management clinic. A convenience sample of fibromyalgia patients was obtained through advertisements posted in the clinic. Participants were able to spend clinic waiting time with a certified therapy dog instead of waiting in the outpatient waiting area. When the therapy dog was not available, individuals remained in the waiting area. OUTCOME MEASURES.: Self-reported pain, fatigue, and emotional distress were recorded using 11-point numeric rating scales before and after the therapy dog visit or waiting room time. Data were evaluated from 106 therapy dog visits and 49 waiting room controls, with no significant between-group demographic differences in participants. Average intervention duration was 12 minutes for the therapy dog visit and 17 minutes for the waiting room control. Significant improvements were reported for pain, mood, and other measures of distress among patients after the therapy dog visit, but not the waiting room control. Clinically meaningful pain relief (≥2 points pain severity reduction) occurred in 34% after the therapy dog visit and 4% in the waiting room control. Outcome was not affected by the presence of comorbid anxiety or depression. Brief therapy dog visits may provide a valuable complementary therapy for fibromyalgia outpatients. Wiley Periodicals, Inc.
33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...
33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
19. Detail of original leveraction rim lock, downstairs door between ...
19. Detail of original lever-action rim lock, downstairs door between central hall and southwest room, looking northwest - Merkel Farmstead, House, 8570 Louella Lane, south side of U.S. Route 64, Shiloh, St. Clair County, IL
2007-07-20
JSC2007-E-41011 (20 July 2007) --- STS-118 Ascent/Entry flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich (center right) and astronaut Tony Antonelli, spacecraft communicator (CAPCOM), hold the STS-118 mission logo.
Report #12-P-0847, September 21, 2012.Our review of the security posture and in-place environmental controls of EPA’s Radiation and Indoor Environments National Laboratory computer room disclosed an array of security and environmental control deficiencies.
28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...
28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA
31. Perimeter acquisition radar building room #318, data storage "racks"; ...
31. Perimeter acquisition radar building room #318, data storage "racks"; sign read: M&D controller, logic control buffer, data transmission controller - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
2013-08-09
CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang
A SUMMARY COMPARISON OF DESIGN EVALUATION TECHNIQUES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spielman, Zachary; Hill, Rachael
The United States’ fleet of Nuclear Reactors is considering modernizing their control rooms and instrumentation as an effort to avoid component obsolescence, keep up with competing industries, and cater to a new work force among others. Multiple technologies have potential to improve the control room. In attempts to evaluate the available options researchers employ a variety of measures to ensure the best candidate is used in a modernizing effort. The NRC is in charge of ensuring any new design has been thoroughly vetted before approving a license. Laid out in NUREG-0711 “Human Factors Engineering Program Review Model” is the reviewmore » criteria for design validation. As there are a variety of measures currently used to evaluate candidate technologies, this paper seeks to identify weaknesses in the common measures used to design and validate technology in control room modernization efforts. Identifying where measurements are not meeting the criteria will help the control room modernization research platform identify where measurement development needs to occur. This will help ensure that current performance measurements are producing as reliable results as possible to select the right technology to integrate into nuclear operating control rooms.« less
Stability of human sera collected for clinical chemistry determinations
NASA Technical Reports Server (NTRS)
Townsend, F. M.
1969-01-01
Problems in collecting and shipping human sera for clinical chemical analyses affect their stability and require proper preservation methods. It is shown that glutamic pyruvate transaminase is very unstable and serum cannot be shipped unless the shipping time is carefully controlled and is less than two days under refrigeration. A limit of four days handling time and avoidance of light exposure are required in bilirubin testing of specimens. Addition of 11 mg of a 10 to 1 mixture of finely powdered sodium fluoride and thymol per ml of blood to preserve specimen stability en route to a central laboratory prevents glycolysis. A citrate buffer at pH 6.2 in serum to be tested for alkaline phosphatase lessens decline at room temperature.
Single Biomolecules at Cryogenic Temperatures: From Structure to Dynamics
NASA Astrophysics Data System (ADS)
Hofmann, Clemens; Kulzer, Florian; Zondervan, Rob; Köhler, Jürgen; Orrit, Michel
Elucidating the dynamics of proteins remains a central and daunting challenge of molecular biology. In our contribution we discuss the relevance of lowtemperature observations not only to structure, but also to dynamics, and thereby to the function of proteins. We first review investigations on light-harvesting complexes to illustrate how increased photostability at low temperatures and spectral selection provide a deeper insight into the excitonic interactions of the chromophores and the dynamics of the protein scaffold. Furthermore, we introduce a novel technique that achieves controlled, reproducible temperature cycles of a microscopic sample on microsecond timescales. We discuss the potential of this technique as a tool to achieve repeatable single-molecule freeze-trapping and to overcome some of the limitations of single-molecule experiments at room temperature.
14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. WrightPatterson ...
14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. - Wright-Patterson Air Force Base, Area B, Building No. 20A, Propeller Test Complex, Seventh Street, from E to G Streets, Dayton, Montgomery County, OH
16. View of Building 100 control room. 1987. On file ...
16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
IET control building (TAN620). interior room. sign says, "emergency equipment ...
IET control building (TAN-620). interior room. sign says, "emergency equipment for metal fires." INEEL negative no. HD-21-1-2 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
40 CFR 62.15105 - Who must complete the operator training course? By when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...
40 CFR 62.15105 - Who must complete the operator training course? By when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...
PBF Control Building (PER619). Interior detail of control room's severe ...
PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...
17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR
Control centers design for ergonomics and safety.
Quintana, Leonardo; Lizarazo, Cesar; Bernal, Oscar; Cordoba, Jorge; Arias, Claudia; Monroy, Magda; Cotrino, Carlos; Montoya, Olga
2012-01-01
This paper shows the general design conditions about ergonomics and safety for control centers in the petrochemical process industry. Some of the topics include guidelines for the optimized workstation design, control room layout, building layout, and lighting, acoustical and environmental design. Also takes into account the safety parameters in the control rooms and centers design. The conditions and parameters shown in this paper come from the standards and global advances on this topic on the most recent publications. And also the work was supplemented by field visits of our team to the control center operations in a petrochemical company, and technical literature search efforts. This guideline will be useful to increase the productivity and improve the working conditions at the control rooms.
12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...
12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA
2009-05-06
CAPE CANAVERAL, Fla. – A technician works at installing a new window in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller
21. Interior view of citric acid air pollution control room ...
21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance ...
8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance and inner blast door. - Edwards Air Force Base, South Base Sled Track, Firing & Control Blockhouse for 10,000-foot Track, South of Sled Track at midpoint of 20,000-foot track, Lancaster, Los Angeles County, CA
82. VIEW OF AIRCONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF ...
82. VIEW OF AIR-CONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF SLC-3E CONTROL ROOM. DIAL ON RIGHT (EAST) PERPENDICULAR WALL IS DIMMER FOR ROOM LIGHTING. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Clifford Charlesworth seated at his console in Mission Control Room
1968-12-21
S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.
Controlled dehydration of a ruthenium complex-DNA crystal induces reversible DNA kinking.
Hall, James P; Sanchez-Weatherby, Juan; Alberti, Cora; Quimper, Caroline Hurtado; O'Sullivan, Kyra; Brazier, John A; Winter, Graeme; Sorensen, Thomas; Kelly, John M; Cardin, David J; Cardin, Christine J
2014-12-17
Hydration-dependent DNA deformation has been known since Rosalind Franklin recognized that the relative humidity of the sample had to be maintained to observe a single conformation in DNA fiber diffraction. We now report for the first time the crystal structure, at the atomic level, of a dehydrated form of a DNA duplex and demonstrate the reversible interconversion to the hydrated form at room temperature. This system, containing d(TCGGCGCCGA) in the presence of Λ-[Ru(TAP)2(dppz)](2+) (TAP = 1,4,5,8-tetraazaphenanthrene, dppz = dipyrido[3,2-a:2',3'-c]phenazine), undergoes a partial transition from an A/B hybrid to the A-DNA conformation, at 84-79% relative humidity. This is accompanied by an increase in kink at the central step from 22° to 51°, with a large movement of the terminal bases forming the intercalation site. This transition is reversible on rehydration. Seven data sets, collected from one crystal at room temperature, show the consequences of dehydration at near-atomic resolution. This result highlights that crystals, traditionally thought of as static systems, are still dynamic and therefore can be the subject of further experimentation.
Method of installing a control room console in a nuclear power plant
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1994-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Advanced nuclear plant control room complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1993-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Radio System for Locating Emergency Workers
NASA Technical Reports Server (NTRS)
Larson, William; Medelius, Pedro; Starr, Stan; Bedette, Guy; Taylor, John; Moerk, Steve
2003-01-01
A system based on low-power radio transponders and associated analog and digital electronic circuitry has been developed for locating firefighters and other emergency workers deployed in a building or other structure. The system has obvious potential for saving lives and reducing the risk of injuries. The system includes (1) a central station equipped with a computer and a transceiver; (2) active radio-frequency (RF) identification tags, each placed in a different room or region of the structure; and (3) transponder units worn by the emergency workers. The RF identification tags can be installed in a new building as built-in components of standard fire-detection devices or ground-fault electrical outlets or can be attached to such devices in a previously constructed building, without need for rewiring the building. Each RF identification tag contains information that uniquely identifies it. When each tag is installed, information on its location and identity are reported to, and stored at, the central station. In an emergency, if a building has not been prewired with RF identification tags, leading emergency workers could drop sequentially numbered portable tags in the rooms of the building, reporting the tag numbers and locations by radio to the central station as they proceed.
133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM ...
133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM ...
143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM (214), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM ...
137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...
11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Türkoğlu, Emir Alper, E-mail: eaturkoglu@yandex.com; Ağrı İbrahim Çeçen University, Central Research and Application Laboratory, Ağrı; Kurt, Murat, E-mail: muratkurt60@hotmail.com
Ağrı İbrahim Çeçen University built a central research and application laboratory (CRAL) in the east of Turkey. The CRAL possesses 7 research and analysis laboratories, 12 experts and researchers, 8 standard rooms for guest researchers, a restaurant, a conference hall, a meeting room, a prey room and a computer laboratory. The CRAL aims certain collaborations between researchers, experts, clinicians and educators in the areas of biotechnology, bioimagining, food safety & quality, omic sciences such as genomics, proteomics and metallomics. It also intends to develop sustainable solutions in agriculture and animal husbandry, promote public health quality, collect scientific knowledge and keepmore » it for future generations, contribute scientific awareness of all stratums of society, provide consulting for small initiatives and industries. It has been collaborated several scientific foundations since 2011.« less
Integrated intelligent systems in advanced reactor control rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckmeyer, R.R.
1989-01-01
An intelligent, reactor control room, information system is designed to be an integral part of an advanced control room and will assist the reactor operator's decision making process by continuously monitoring the current plant state and providing recommended operator actions to improve that state. This intelligent system is an integral part of, as well as an extension to, the plant protection and control systems. This paper describes the interaction of several functional components (intelligent information data display, technical specifications monitoring, and dynamic procedures) of the overall system and the artificial intelligence laboratory environment assembled for testing the prototype. 10 refs.,more » 5 figs.« less
West wall of rotunda extension. The rotunda is positioned behind ...
West wall of rotunda extension. The rotunda is positioned behind the central ashlar coursed stone section. Rooms flanking the rotunda are bounded by the Verandahs. - U. S. Naval Asylum, Biddle Hall, Gray's Ferry Avenue, Philadelphia, Philadelphia County, PA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald Boring; Roger Lew; Thomas Ulrich
2014-03-01
As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how themore » process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.« less
Starke, Sandra D; Baber, Chris; Cooke, Neil J; Howes, Andrew
2017-05-01
Road traffic control rooms rely on human operators to monitor and interact with information presented on multiple displays. Past studies have found inconsistent use of available visual information sources in such settings across different domains. In this study, we aimed to broaden the understanding of observer behaviour in control rooms by analysing a case study in road traffic control. We conducted a field study in a live road traffic control room where five operators responded to incidents while wearing a mobile eye tracker. Using qualitative and quantitative approaches, we investigated the operators' workflow using ergonomics methods and quantified visual information sampling. We found that individuals showed differing preferences for viewing modalities and weighting of task components, with a strong coupling between eye and head movement. For the quantitative analysis of the eye tracking data, we propose a number of metrics which may prove useful to compare visual sampling behaviour across domains in future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.
New thinking for the boiler room.
Rose, Wayne
2008-09-01
Wayne Rose, marketing manager at integrated plant room manufacturer Armstrong Integrated Systems, explains how increasing use of off-site manufacture, the latest 3D modelling technology, and advances in control technology, are revolutionising boiler room design and construction.
2003-08-29
KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.
Park, Seong-Hyun; Mattson, Richard H
2009-09-01
Clinical trials have not been reported concerning the health benefits of viewing indoor plants on stress and recovery of surgical patients within a hospital setting. Using various medical and psychologic measurements, this study performed a randomized clinical trial with surgical patients to evaluate whether plants in hospital rooms have therapeutic influences. Ninety (90) patients recovering from a hemorrhoidectomy were randomly assigned to either control or plant rooms. With half the patients, live plants were placed in their rooms during postoperative recovery periods. Data collected for each patient included length of hospitalization, analgesics used for postoperative pain control, vital signs, ratings of pain intensity, pain distress, anxiety and fatigue, the State-Trait Anxiety Inventory Form Y-1, the Environmental Assessment Scale, and the Patient's Room Satisfaction Questionnaire. Viewing plants during the recovery period had a positive influence linking directly to health outcomes of surgical patients. Patients in hospital rooms with plants and flowers had significantly more positive physiologic responses evidenced by lower systolic blood pressure, and lower ratings of pain, anxiety, and fatigue than patients in the control room. Patients with plants also felt more positively about their rooms and evaluated them with higher satisfaction when compared with patients in similar rooms without plants. Based on patients' comments, plants brightened up the room environment, reduced stress, and also conveyed positive impressions of hospital employees caring for patients. Findings of this study confirmed the therapeutic value of plants in the hospital environment as a noninvasive, inexpensive, and effective complementary medicine for surgical patients. Health care professionals and hospital administrators need to consider the use of plants and flowers to enhance healing environments for patients.
Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boring, Ronald L.; Joe, Jeffrey C.
2015-02-01
For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intendedmore » to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.« less
140. Detail of north control panel in control room, looking ...
140. Detail of north control panel in control room, looking north. This panel monitors a variety of activities: gages indicate the level of Lake Tapps and level of the circular forebay; wattmeters indicate output of exciters. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
FET. Control and equipment building, TAN630. Main floor plan. Control ...
FET. Control and equipment building, TAN-630. Main floor plan. Control room. Room numbers and functions. Ralph M. Parsons. 1229-2-ANP/GE-5-630-A-2. Date: March 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 036-0630-00-693-107081 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Diamond, Gary M.; Didner, Hila; Waniel, Ariela; Priel, Beatriz; Asherov, Jack; Arbel, Shosh
2005-01-01
Levels of perceived parental care and control among 24 female Israeli adolescents presenting at emergency rooms after a self-poisoning act of low lethality were compared to those found among 23 non-self-harming, community controls. Adolescents' perceived levels of parental care and control were measured via both adolescents' self-report and…
Mission Operations Control Room (MOCR) activities during STS-6 mission
1983-04-05
Astronauts Roy D. Bridges (left) and RIchard O. Covey serve as spacecraft communicators (CAPCOM) for STS-6. They are seated at the CAPCOM console in the mission operations control room (MOCR) of JSC's mission control center (30119); Flight Director Jay H. Greene communicates with a nearby flight controller in the MOCR just after launch of the Challenger (30120).
5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, ...
5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, SHOWING PUMP MOTOR AND STEEL BULKHEADS IN FLOOR FOR ACCESS TO PUMPS - Providence Sewage Treatment System, Reservoir Avenue Pumping Station, Reservoir & Pontiac Avenues, Providence, Providence County, RI
68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO ...
68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO TURBINE HALL AT UNITS 3, 5, AND 2) - Delaware County Electric Company, Chester Station, Delaware River at South end of Ward Street, Chester, Delaware County, PA
8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), ...
8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), FROM ENTRYWAY, LOOKING NORTH, SHOWING ADDITIONAL 'GAMEWELL' FIRE ALARM SYSTEMS. - Oakland Naval Supply Center, Firehouse, East of Fourth Street, between A & B Streets, Oakland, Alameda County, CA
11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL ...
11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL OF BOEING 737 AT TOP OF PHOTOGRAPH IN FULL-SCALE WIND TUNNEL. - NASA Langley Research Center, Full-Scale Wind Tunnel, 224 Hunting Avenue, Hampton, Hampton, VA
15. Interior view of unoccupied controlled computer room looking at ...
15. Interior view of unoccupied controlled computer room looking at exit door and office; northwest corner of unoccupied portion; view to south. - Ellsworth Air Force Base, Mess & Administration Building, 2279 Risner Drive, Blackhawk, Meade County, SD
17. Perimeter acquisition radar building room #105, mechanical equipment room ...
17. Perimeter acquisition radar building room #105, mechanical equipment room no. 1; sign reads: Heat exchangers (shell and tube type). Provide precise temperature control of water for cooling critical electronic equipment - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
12. Historic view of Building 100 control room, showing television ...
12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Documentation of White Flight Control Room (WFCR), Building 30 during STS-109.
2002-03-07
JSC2002-E-08460 (7 March 2002) --- Flight directors Jeff Hanley (standing) and Bryan P. Austin watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houston;s Mission Control Center (MCC) during the STS-109 Hubble Space Telescope (HST) servicing mission.
37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE ...
37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE CONTROL ROOM FOR THE DISASSEMBLY BAY. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
Altitude Wind Tunnel Control Room
1945-05-21
Researchers at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory monitor a ramjet's performance in the Altitude Wind Tunnel from the control room. The soundproof control room was just a few feet from the tunnel’s 20-foot-diameter test section. In the control room, the operators could control all aspects of the tunnel’s operation, including the air density, temperature, and speed. They also operated the engine or test article in the test section by controlling the angle-of-attack, speed, power, and other parameters. The men in this photograph are monitoring the engine’s thrust and lift. A NACA-designed 20-inch-diameter ramjet was installed in the tunnel in May 1945. Thrust figures from these runs were compared with drag data from tests of scale models in small supersonic tunnels to verify the ramjet’s feasibility. The tunnel was used to analyze the ramjet’s overall performance up to altitudes of 47,000 feet and speeds to Mach 1.84. The researchers found that an increase in altitude caused a reduction in the engine’s horsepower and identified optimal flameholder configurations.
141. Detail of east control panel in control room, looking ...
141. Detail of east control panel in control room, looking east. This panel contains electrical switches that were used to control valves at circular forebay. It also contains voltage regulators, synchroscope adjust field breaker, ammeters, wattmeters, temperature indicator of generator windings, and butterfly valve and governor controls. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
Maben, Jill; Penfold, Clarissa; Simon, Michael; Anderson, Janet E; Robert, Glenn; Pizzo, Elena; Hughes, Jane; Murrells, Trevor; Barlow, James
2016-01-01
Background and objectives There is little strong evidence relating to the impact of single-room accommodation on healthcare quality and safety. We explore the impact of all single rooms on staff and patient experience; safety outcomes; and costs. Methods Mixed methods pre/post ‘move’ comparison within four nested case study wards in a single acute hospital with 100% single rooms; quasi-experimental before-and-after study with two control hospitals; analysis of capital and operational costs associated with single rooms. Results Two-thirds of patients expressed a preference for single rooms with comfort and control outweighing any disadvantages (sense of isolation) felt by some. Patients appreciated privacy, confidentiality and flexibility for visitors afforded by single rooms. Staff perceived improvements (patient comfort and confidentiality), but single rooms were worse for visibility, surveillance, teamwork, monitoring and keeping patients safe. Staff walking distances increased significantly post move. A temporary increase of falls and medication errors in one ward was likely to be associated with the need to adjust work patterns rather than associated with single rooms per se. We found no evidence that single rooms reduced infection rates. Building an all single-room hospital can cost 5% more with higher housekeeping and cleaning costs but the difference is marginal over time. Conclusions Staff needed to adapt their working practices significantly and felt unprepared for new ways of working with potentially significant implications for the nature of teamwork in the longer term. Staff preference remained for a mix of single rooms and bays. Patients preferred single rooms. PMID:26408568
24 CFR 266.205 - Ineligible projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... designed for the elderly with extensive services and luxury accommodations that provide for central kitchens and dining rooms with food service or mandatory services. (d) Nursing homes or intermediate care facilities. Nursing homes and intermediate care facilities licensed and regulated by State or local...
24 CFR 266.205 - Ineligible projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... designed for the elderly with extensive services and luxury accommodations that provide for central kitchens and dining rooms with food service or mandatory services. (d) Nursing homes or intermediate care facilities. Nursing homes and intermediate care facilities licensed and regulated by State or local...
24 CFR 266.205 - Ineligible projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... designed for the elderly with extensive services and luxury accommodations that provide for central kitchens and dining rooms with food service or mandatory services. (d) Nursing homes or intermediate care facilities. Nursing homes and intermediate care facilities licensed and regulated by State or local...
24 CFR 266.205 - Ineligible projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... designed for the elderly with extensive services and luxury accommodations that provide for central kitchens and dining rooms with food service or mandatory services. (d) Nursing homes or intermediate care facilities. Nursing homes and intermediate care facilities licensed and regulated by State or local...
24 CFR 266.205 - Ineligible projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... designed for the elderly with extensive services and luxury accommodations that provide for central kitchens and dining rooms with food service or mandatory services. (d) Nursing homes or intermediate care facilities. Nursing homes and intermediate care facilities licensed and regulated by State or local...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... exclusively, with a hardboard top covered with vinyl or fabric. Folding metal tables have legs that... is available in the Central Records Unit (``CRU''), room 7046 of the main Department of Commerce...
Ductless Mini-Split Heat Pump Comfort Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roth, K.; Sehgal, N.; Akers, C.
2013-03-01
Field tests were conducted in two homes in Austin, TX, to evaluate the comfort performance of ductless minisplit heat pumps (DMSHPs), measuring temperature and relative humidity measurements in four rooms in each home before and after retrofitting a central HVAC system with DMSHPs.
Ductless Mini-Split Heat Pump Comfort Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roth, K.; Sehgal, N.; Akers, C.
2013-03-01
Field tests were conducted in two homes in Austin, TX to evaluate the comfort performance of ductless mini-split heat pumps (DMSHPs), measuring temperature and relative humidity measurements in four rooms in each home before and after retrofitting a central HVAC system with DMSHPs.
78 FR 65040 - Chicago Central & Pacific Railroad Company-Abandonment Exemption-in Linn County, Iowa
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... Abandonments to abandon an approximately 0.49-mile line of railroad extending between milepost 230.24 and... assessment (EA) on October 23, 2013. Interested persons may obtain a copy of the EA by writing to OEA (Room...
76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...
30. Perimeter acquisition radar building room #318, showing radar control. ...
30. Perimeter acquisition radar building room #318, showing radar control. Console and line printers - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... following correcting amendments: PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...
Oller, Anna R; Province, Larry; Curless, Brian
2010-01-01
Staphylococcus aureus is spread via direct contact with persons and indirect contact via environmental surfaces such as weight benches. Athletes participating in direct-contact sports have an increased risk of acquiring S aureus infections. To determine (1) potential environmental reservoirs of S aureus in football and wrestling locker rooms and weight rooms, (2) environmental bacterial status after employing more stringent cleaning methods, (3) differences in colonization rates between athletes and nonathletes, (4) exposed body locations where Staphylococcus was recovered more frequently, and (5) personal hygiene practices of athletes and nonathletes. Cross-sectional study. Locker room and strengthening and conditioning facilities at a National Collegiate Athletic Association Division II university. Collegiate football players and wrestlers, with nonathlete campus residents serving as the control group. Infection control methods, education of the custodial staff, and education of the athletes regarding the Centers for Disease Control and Prevention guidelines for infection prevention. Cultures were taken from the participants' noses, fingertips, knuckles, forearms, and shoes and from the environment. Before the intervention, from the 108 environmental samples taken from the football locker room and weight room, 26 (24%) contained methicillin-susceptible S aureus (MSSA) and 33 (31%) contained methicillin-resistant S aureus (MRSA). From the 39 environmental samples taken from the wrestling locker room and pit areas, 1 (3%) contained MSSA and 4 (10%) contained MRSA. The MRSA rates were different between the 2 locations according to a chi(2) test (P = .01). Seven MRSA isolates were recovered from football players and 1 from a wrestler; no MRSA isolates were recovered from the control group. The fingertip location of S aureus recovery from football players was significant when compared with both other locations in football players and fingertips in wrestlers and the control group (P < .05). Football players and wrestlers shared more personal items than the control group (P < .05). After the intervention, the football locker room and weight room samples were negative for S aureus. Intact strengthening and conditioning equipment, proper hygiene, and proper disinfection methods lowered both environmental and human S aureus recovery at 1 university.
Real, Kevin; Fay, Lindsey; Isaacs, Kathy; Carll-White, Allison; Schadler, Aric
2018-01-01
This study utilizes systems theory to understand how changes to physical design structures impact communication processes and patient and staff design-related outcomes. Many scholars and researchers have noted the importance of communication and teamwork for patient care quality. Few studies have examined changes to nursing station design within a systems theory framework. This study employed a multimethod, before-and-after, quasi-experimental research design. Nurses completed surveys in centralized units and later in decentralized units ( N = 26 pre , N = 51 post ). Patients completed surveys ( N = 62 pre ) in centralized units and later in decentralized units ( N = 49 post ). Surveys included quantitative measures and qualitative open-ended responses. Patients preferred the decentralized units because of larger single-occupancy rooms, greater privacy/confidentiality, and overall satisfaction with design. Nurses had a more complex response. Nurses approved the patient rooms, unit environment, and noise levels in decentralized units. However, they reported reduced access to support spaces, lower levels of team/mentoring communication, and less satisfaction with design than in centralized units. Qualitative findings supported these results. Nurses were more positive about centralized units and patients were more positive toward decentralized units. The results of this study suggest a need to understand how system components operate in concert. A major contribution of this study is the inclusion of patient satisfaction with design, an important yet overlooked fact in patient satisfaction. Healthcare design researchers and practitioners may consider how changing system interdependencies can lead to unexpected changes to communication processes and system outcomes in complex systems.
104. ARAIII. Interior view of room 110 in ARA607 used ...
104. ARA-III. Interior view of room 110 in ARA-607 used as data acquisition control room. Camera facing northeast. Ineel photo no. 81-103. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Grant, Michael C; Hanna, Andrew; Benson, Andrew; Hobson, Deborah; Wu, Christopher L; Yuan, Christina T; Rosen, Michael; Wick, Elizabeth C
2018-03-01
Our aim was to determine whether the establishment of a dedicated operating room team leads to improved process measure compliance and clinical outcomes in an Enhanced Recovery after Surgery (ERAS) program. Enhanced Recovery after Surgery programs involve the application of bundled best practices to improve the value of perioperative care. Successful implementation and sustainment of ERAS programs has been linked to compliance with protocol elements. Development of dedicated teams of anesthesia providers was a component of ERAS implementation. Intraoperative provider team networks (surgeons, anesthesiologists, and certified registered nurse anesthetists) were developed for all cases before and after implementation of colorectal ERAS. Four measures of centrality were analyzed in each network based on case assignments, and these measures were correlated with both rates of process measure compliance and clinical outcomes. Enhanced Recovery after Surgery provider teams led to a decrease in the closeness of anesthesiologists (p = 0.04) and significant increase in the clustering coefficient of certified registered nurse anesthetists (p = 0.005) compared with the pre-ERAS network. There was no significant change in centrality among surgeons (p = NS for all measures). Enhanced Recovery after Surgery designation among anesthesiologists and nurse anesthetists-whereby individual providers received an in-service on protocol elements and received compliance data was strongly associated with high compliance (>0.6 of measures; p < 0.001 for each group). In addition, high compliance was associated with a significant reduction in length of stay (p < 0.01), surgical site infection (p < 0.002), and morbidity (p < 0.009). Dedicated operating room teams led to increased centrality among anesthesia providers, which in turn not only increased compliance, but also improved several clinical outcomes. Copyright © 2017 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
Maben, Jill; Murrells, Trevor; Griffiths, Peter
2016-01-01
Objectives A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. Methods A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people’s wards. Move to 100% single room accommodation compared to ‘steady state’ and ‘new build’ control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Results Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people’s ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people’s ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. Conclusion For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. PMID:26811373
Simon, Michael; Maben, Jill; Murrells, Trevor; Griffiths, Peter
2016-07-01
A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people's wards. Move to 100% single room accommodation compared to 'steady state' and 'new build' control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people's ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people's ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. © The Author(s) 2016.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
..., Riverdale, MD 20737-1238. Please state that your comment refers to Docket No. APHIS-2010-0078. Reading Room: You may read any comments that we receive on the environmental assessment in our reading room. The reading room is located in room 1141 of the USDA South Building, 14th Street and Independence Avenue, SW...
Intrahospital teleradiology from the emergency room
NASA Astrophysics Data System (ADS)
Fuhrman, Carl R.; Slasky, B. S.; Gur, David; Lattner, Stefanie; Herron, John M.; Plunkett, Michael B.; Towers, Jeffrey D.; Thaete, F. Leland
1993-09-01
Off-hour operations of the modern emergency room presents a challenge to conventional image management systems. To assess the utility of intrahospital teleradiology systems from the emergency room (ER), we installed a high-resolution film digitizer which was interfaced to a central archive and to a workstation at the main reading room. The system was designed to allow for digitization of images as soon as the films were processed. Digitized images were autorouted to both destinations, and digitized images could be laser printed (if desired). Almost real time interpretations of nonselected cases were performed at both locations (conventional film in the ER and a workstation in the main reading room), and an analysis of disagreements was performed. Our results demonstrate that in spite of a `significant' difference in reporting, `clinically significant differences' were found in less than 5% of cases. Folder management issues, preprocessing, image orientation, and setting reasonable lookup tables for display were identified as the main limitations to the systems' routine use in a busy environment. The main limitation of the conventional film was the identification of subtle abnormalities in the bright regions of the film. Once identified on either system (conventional film or soft display), all abnormalities were visible and detectable on both display modalities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Robert G.; Wilkerson, Andrea M.
This report summarizes the results from a trial installation of light-emitting diode (LED) lighting systems in several spaces within the ACC Care Center in Sacramento, CA. The Sacramento Municipal Utility District (SMUD) coordinated the project and invited the U.S. Department of Energy (DOE) to document the performance of the LED lighting systems as part of a GATEWAY evaluation. DOE tasked the Pacific Northwest National Laboratory (PNNL) to conduct the investigation. SMUD and ACC staff coordinated and completed the design and installation of the LED systems, while PNNL and SMUD staff evaluated the photometric performance of the systems. ACC staff alsomore » track behavioral and health measures of the residents; some of those results are reported here, although PNNL staff were not directly involved in collecting or interpreting those data. The trial installation took place in a double resident room and a single resident room, and the corridor that connects those (and other) rooms to the central nurse station. Other spaces in the trial included the nurse station, a common room called the family room located near the nurse station, and the ACC administrator’s private office.« less
Kaplan, Kara; Echert, Ashley E; Massat, Ben; Puissant, Madeleine M; Palygin, Oleg; Geurts, Aron M; Hodges, Matthew R
2016-05-01
Genetic deletion of brain serotonin (5-HT) neurons in mice leads to ventilatory deficits and increased neonatal mortality during development. However, it is unclear if the loss of the 5-HT neurons or the loss of the neurochemical 5-HT led to the observed physiologic deficits. Herein, we generated a mutant rat model with constitutive central nervous system (CNS) 5-HT depletion by mutation of the tryptophan hydroxylase 2 (Tph2) gene in dark agouti (DA(Tph2-/-)) rats. DA(Tph2-/-) rats lacked TPH immunoreactivity and brain 5-HT but retain dopa decarboxylase-expressing raphe neurons. Mutant rats were also smaller, had relatively high mortality (∼50%), and compared with controls had reduced room air ventilation and body temperatures at specific postnatal ages. In adult rats, breathing at rest and hypoxic and hypercapnic chemoreflexes were unaltered in adult male and female DA(Tph2-/-) rats. Body temperature was also maintained in adult DA(Tph2-/-) rats exposed to 4°C, indicating unaltered ventilatory and/or thermoregulatory control mechanisms. Finally, DA(Tph2-/-) rats treated with the 5-HT precursor 5-hydroxytryptophan (5-HTP) partially restored CNS 5-HT and showed increased ventilation (P < 0.05) at a developmental age when it was otherwise attenuated in the mutants. We conclude that constitutive CNS production of 5-HT is critically important to fundamental homeostatic control systems for breathing and temperature during postnatal development in the rat. Copyright © 2016 the American Physiological Society.
Kaplan, Kara; Echert, Ashley E.; Massat, Ben; Puissant, Madeleine M.; Palygin, Oleg; Geurts, Aron M.
2016-01-01
Genetic deletion of brain serotonin (5-HT) neurons in mice leads to ventilatory deficits and increased neonatal mortality during development. However, it is unclear if the loss of the 5-HT neurons or the loss of the neurochemical 5-HT led to the observed physiologic deficits. Herein, we generated a mutant rat model with constitutive central nervous system (CNS) 5-HT depletion by mutation of the tryptophan hydroxylase 2 (Tph2) gene in dark agouti (DATph2−/−) rats. DATph2−/− rats lacked TPH immunoreactivity and brain 5-HT but retain dopa decarboxylase-expressing raphe neurons. Mutant rats were also smaller, had relatively high mortality (∼50%), and compared with controls had reduced room air ventilation and body temperatures at specific postnatal ages. In adult rats, breathing at rest and hypoxic and hypercapnic chemoreflexes were unaltered in adult male and female DATph2−/− rats. Body temperature was also maintained in adult DATph2−/− rats exposed to 4°C, indicating unaltered ventilatory and/or thermoregulatory control mechanisms. Finally, DATph2−/− rats treated with the 5-HT precursor 5-hydroxytryptophan (5-HTP) partially restored CNS 5-HT and showed increased ventilation (P < 0.05) at a developmental age when it was otherwise attenuated in the mutants. We conclude that constitutive CNS production of 5-HT is critically important to fundamental homeostatic control systems for breathing and temperature during postnatal development in the rat. PMID:26869713
IET control building (TAN620). interior personnel service room. sign next ...
IET control building (TAN-620). interior personnel service room. sign next to shower stall says, "fight athlete's foot with sani-mist." INEEL negative no. HD-21-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
18. Historic plan of Building 100 control room. March 21, ...
18. Historic plan of Building 100 control room. March 21, 1956. NASA GRC drawing number CE-101736. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
3. DETAIL OF RACKS AND TEMPERATURE/HUMIDITY CONTROL SYSTEM IN CURING ...
3. DETAIL OF RACKS AND TEMPERATURE/HUMIDITY CONTROL SYSTEM IN CURING ROOM ON LEVEL 6; LOOKING SOUTHEAST; ENVIRONMENT INSIDE THE CURING ROOM WAS CONTROLLED BY NIAGARA MODEL 87007 SPRAY COOLER AND BUFFALO FORGE CENTRIFUGAL FAN IN BACKGROUND - Rath Packing Company, Cooler Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
Evaluation of an I-box wind tunnel model for assessment of behavioral responses of blow flies.
Moophayak, Kittikhun; Sukontason, Kabkaew L; Kurahashi, Hiromu; Vogtsberger, Roy C; Sukontason, Kom
2013-11-01
The behavioral response of flies to olfactory cues remains the focus of many investigations, and wind tunnels have sometimes been employed for assessment of this variable in the laboratory. In this study, our aim was to design, construct, and operate a new model of I-box wind tunnel with improved efficacy, highlighting the use of a new wind tunnel model to investigate the behavioral response of the medically important blow fly, Chrysomya megacephala (Fabricius). The I-box dual-choice wind tunnel designed for this study consists of seven conjoined compartments that resulted in a linear apparatus with clear glass tunnel of 30 × 30 × 190 cm ended both sides with wooden "fan compartments" which are equipped with adjustable fans as wind source. The clear glass tunnel consisted of two "stimulus compartments" with either presence or absence (control) of bait; two "trap compartments" where flies were attracted and allowed to reside; and one central "release compartment" where flies were introduced. Wind tunnel experiments were carried out in a temperature-controlled room, with a room light as a light source and a room-ventilated fan as odor-remover from tunnel out. Evaluation of testing parameters revealed that the highest attractive index was achieved with the use of 300 g of 1-day tainted pork scrap (pork meat mixed with offal) as bait in wind tunnel settings wind speed of 0.58 m/s, during 1.00-5.00 PM with light intensity of 341.33 lux from vertical light and 135.93 lux from horizontal light for testing a group of 60 flies. In addition, no significant response of well-fed and 24 h staved flies to this bait under these conditions was found. Results of this study supported this new wind tunnel model as a suitable apparatus for investigation of behavioral response of blow flies to bait chemical cues in the laboratory.
14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM ...
14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM 3, FLOW CONTROL ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED ...
57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED OVER CONTROL ROOM MEZZANINE. SHOWN WITHIN THE BRICK PARTITIONS ARE SIGNAL VOLTAGE AUTOTRANSFORMERS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT
Photocopy of photograph (original negative located in LBNL Photo Lab ...
Photocopy of photograph (original negative located in LBNL Photo Lab Collection). March 2005. TOP OF BEVATRON, BUILDING 51 ROOF TRUSS, AND CENTRAL RING TRACK FOR MAGNET ROOM CRANE, BEVATRON - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA
INTERIOR VIEW LOOKING NORTH FROM THE MIDPOINT OF THE ATTICS ...
INTERIOR VIEW LOOKING NORTH FROM THE MIDPOINT OF THE ATTICS CENTRAL PASSAGE. THIS VIEW CAPTURES THE MANNER IN WHICH SKYLIGHTS AND MONITORS PROVIDED LIGHT FOR THE ATTICS INTERIOR ROOMS AND SPACES - The Woodlands, 4000 Woodlands Avenue, Philadelphia, Philadelphia County, PA
18. VIEW OF THE CEILING, THE PIPING TRANSPORTED CHEMICALS FROM ...
18. VIEW OF THE CEILING, THE PIPING TRANSPORTED CHEMICALS FROM A CHEMICAL PREPARATION ROOM ON THE SECOND FLOOR TO THE FIRST FLOOR PROCESS AREAS. (6/12/73) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO
40. Historic American Buildings Survey John O. Brostrup, Photographer August ...
40. Historic American Buildings Survey John O. Brostrup, Photographer August 13, 1936 1:50 P. M. DETAIL OF SOUTH WALL-CENTRAL ROOM OF BASEMENT-UNIT B-AFTER CHALKING - General John Mason House, Analostan Island or Theodore Roosevelt Island, Washington, District of Columbia, DC
39. Historic American Buildings Survey John O. Brostrup, Photographer August ...
39. Historic American Buildings Survey John O. Brostrup, Photographer August 13, 1936 1:30 P. M. DETAIL OF SOUTH WALL-CENTRAL ROOM OF BASEMENT-UNIT B-BEFORE CHALKING. - General John Mason House, Analostan Island or Theodore Roosevelt Island, Washington, District of Columbia, DC
21 CFR 312.140 - Address for correspondence.
Code of Federal Regulations, 2010 CFR
2010-04-01
... submission to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug... Generic Drugs (HFD-600), Center for Drug Evaluation and Research, Food and Drug Administration, Metro Park... Evaluation and Research, Food and Drug Administration, 12229 Wilkins Ave., Rockville, MD 20852. (3) For...
21 CFR 312.140 - Address for correspondence.
Code of Federal Regulations, 2011 CFR
2011-04-01
... submission to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug... Generic Drugs (HFD-600), Center for Drug Evaluation and Research, Food and Drug Administration, Metro Park... Evaluation and Research, Food and Drug Administration, 12229 Wilkins Ave., Rockville, MD 20852. (3) For...
[OR management - Checklists for OR-design for OR-managers - results of a workshop].
Bock, Matthias; Steinmeyer-Bauer, Klaus; Schüpfer, Guido
2014-10-01
The construction of an operating room (OR) suite represents an important intermediate- and long term investment. The planning process starts with the quantitative estimation of the procedures to be carried out which defines the operative capacity for the life time of the facility. This permits the calculation of the number of ORs and the definition of the resources for the recovery room, the intermediate care and intensive care unit.The projectors should integrate the new facility into workflow, workload and logistics of the entire hospital. The simulation flow of patients and accompanying persons and of the routes of the personnel is helpful for this purpose. Separating structures for outpatients from those for inpatients and avoiding de-centralized rooms helps designing an efficient and safe OR suite.The design of the single ORs should be flexible to permit changes or technical innovations during their use period. Mobile equipment is preferable to permanently installed devices. We consider an expanse of at least 45 m(2) for any location adequate for general ORs. The space requirements are elevated for hybrid ORs and rooms dedicated for robotic surgery.The design of the suite should separate the flow of personnel, patients and logistics. Surgical instruments and their logistics should be standardized. Dedicated locations for a simultaneous preparation of the instrumentation tables permit parallel processing. Thus an adequate capacity of preparation rooms and storage rooms is necessary. Dressing rooms, rest rooms, showers and lounges are important for the working conditions and should be planned in an adequate size and number. © Georg Thieme Verlag Stuttgart · New York.
Personal sound zone reproduction with room reflections
NASA Astrophysics Data System (ADS)
Olik, Marek
Loudspeaker-based sound systems, capable of a convincing reproduction of different audio streams to listeners in the same acoustic enclosure, are a convenient alternative to headphones. Such systems aim to generate "sound zones" in which target sound programmes are to be reproduced with minimum interference from any alternative programmes. This can be achieved with appropriate filtering of the source (loudspeaker) signals, so that the target sound's energy is directed to the chosen zone while being attenuated elsewhere. The existing methods are unable to produce the required sound energy ratio (acoustic contrast) between the zones with a small number of sources when strong room reflections are present. Optimization of parameters is therefore required for systems with practical limitations to improve their performance in reflective acoustic environments. One important parameter is positioning of sources with respect to the zones and room boundaries. The first contribution of this thesis is a comparison of the key sound zoning methods implemented on compact and distributed geometrical source arrangements. The study presents previously unpublished detailed evaluation and ranking of such arrangements for systems with a limited number of sources in a reflective acoustic environment similar to a domestic room. Motivated by the requirement to investigate the relationship between source positioning and performance in detail, the central contribution of this thesis is a study on optimizing source arrangements when strong individual room reflections occur. Small sound zone systems are studied analytically and numerically to reveal relationships between the geometry of source arrays and performance in terms of acoustic contrast and array effort (related to system efficiency). Three novel source position optimization techniques are proposed to increase the contrast, and geometrical means of reducing the effort are determined. Contrary to previously published case studies, this work presents a systematic examination of the key problem of first order reflections and proposes general optimization techniques, thus forming an important contribution. The remaining contribution considers evaluation and comparison of the proposed techniques with two alternative approaches to sound zone generation under reflective conditions: acoustic contrast control (ACC) combined with anechoic source optimization and sound power minimization (SPM). The study provides a ranking of the examined approaches which could serve as a guideline for method selection for rooms with strong individual reflections.
INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING ...
INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHWEST. INL PHOTO NUMBER HD-54-19-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
First-of-A-Kind Control Room Modernization Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, Kenneth David
This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less
Western Aeronautical Test Range (WATR) mission control Blue room
1994-12-05
Mission control Blue Room, seen here, in building 4800 at NASA's Dryden Flight Research Center, is part of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.
Western Aeronautical Test Range (WATR) mission control Gold room
NASA Technical Reports Server (NTRS)
1990-01-01
Mission control Gold room is seen here, located at the Dryden Flight Research Center of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.
ERIC Educational Resources Information Center
Turner, Ed; Hauser, Dan
1994-01-01
Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…
7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR ...
7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR TO SHED ADDITION, OPEN DOOR TO NORTH MAIN BUILDING ROOM, AND CLOSED DOOR TO BATHROOM. VIEW TO NORTHWEST. - Bishop Creek Hydroelectric System, Control Station, Hydrographer's Office, Bishop Creek, Bishop, Inyo County, CA
ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...
ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), ...
116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751), WITH CABINETS ON EAST SIDE OF ROOM FACING WEST. THE ROW OF CABINETS ON EAST SIDE OF ROOM INCLUDES LEFT TO RIGHT: CABLE DISTRIBUTION UNITS, AUTOPILOT CONTROLS, AND POWER DISTRIBUTION UNITS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Manchikanti, Laxmaiah; Cash, Kimberly A.; McManus, Carla D.; Pampati, Vidyasagar
2013-01-01
Background: Chronic persistent low back and lower extremity pain secondary to central spinal stenosis is common and disabling. Lumbar surgical interventions with decompression or fusion are most commonly performed to manage severe spinal stenosis. However, epidural injections are also frequently performed in managing central spinal stenosis. After failure of epidural steroid injections, the next sequential step is percutaneous adhesiolysis and hypertonic saline neurolysis with a targeted delivery. The literature on the effectiveness of percutaneous adhesiolysis in managing central spinal stenosis after failure of epidural injections has not been widely studied. Study Design: A prospective evaluation. Setting: An interventional pain management practice, a specialty referral center, a private practice setting in the United States. Objective: To evaluate the effectiveness of percutaneous epidural adhesiolysis in patients with chronic low back and lower extremity pain with lumbar central spinal stenosis. Methods: Seventy patients were recruited. The initial phase of the study was randomized, double-blind with a comparison of percutaneous adhesiolysis with caudal epidural injections. The 25 patients from the adhesiolysis group continued with follow-up, along with 45 additional patients, leading to a total of 70 patients. All patients received percutaneous adhesiolysis and appropriate placement of the Racz catheter, followed by an injection of 5 mL of 2% preservative-free lidocaine with subsequent monitoring in the recovery room. In the recovery room, each patient also received 6 mL of 10% hypertonic sodium chloride solution, and 6 mg of non-particulate betamethasone, followed by an injection of 1 mL of sodium chloride solution and removal of the catheter. Outcomes Assessment: Multiple outcome measures were utilized including the Numeric Rating Scale (NRS), the Oswestry Disability Index 2.0 (ODI), employment status, and opioid intake with assessment at 3, 6, and 12, 18 and 24 months post treatment. The primary outcome measure was 50% or more improvement in pain scores and ODI scores. Results: Overall, a primary outcome or significant pain relief and functional status improvement of 50% or more was seen in 71% of patients at the end of 2 years. The overall number of procedures over a period of 2 years were 5.7 ± 2.73. Limitations: The lack of a control group and a prospective design. Conclusions: Significant relief and functional status improvement as seen in 71% of the 70 patients with percutaneous adhesiolysis utilizing local anesthetic steroids and hypertonic sodium chloride solution may be an effective management strategy in patients with chronic function limiting low back and lower extremity pain with central spinal stenosis after failure of conservatie management and fluoroscopically directed epidural injections. PMID:23289005
1969-11-21
S69-59525 (19 Nov. 1969) --- Overall view of activity in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, during the Apollo 12 lunar landing mission. When this picture was made the first Apollo 12 extravehicular activity (EVA) was being televised from the surface of the moon. Photo credit: NASA
3. NORTHEAST REAR, SHOWING CONCRETE ENCASEMENT FOR STAIRWAY LEADING FROM ...
3. NORTHEAST REAR, SHOWING CONCRETE ENCASEMENT FOR STAIRWAY LEADING FROM INSTRUMENT ROOM TO UNDERGROUND FIRING CONTROL ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
14. Historic view of engineer in Building 100 control room ...
14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
13. Historic view of Building 100 control room, showing personnel ...
13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
PBF Control Building (PER619). Interior in data acquisition room showing ...
PBF Control Building (PER-619). Interior in data acquisition room showing data racks. The system recorded multiple channels of data during tests. INEEL negative no. HD-41-8-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
2002-06-05
This paper reports the results of the United Kingdom Childhood Cancer Study relating to risks associated with radon concentrations in participants homes at the time of diagnosis of cancer and for at least 6 months before. Results are given for 2226 case and 3773 control homes. No evidence to support an association between higher radon concentrations and risk of any of the childhood cancers was found. Indeed, evidence of decreasing cancer risks with increasing radon concentrations was observed. Adjustment for deprivation score for area of residence made little difference to this trend and similar patterns were evident in all regions and in all diagnostic groups. The study suggests that control houses had more features, such as double glazing and central heating, leading to higher radon levels than case houses. Further, case houses have features more likely to lead to lower radon levels, e.g. living-rooms above ground level. Consequently the case-control differences could have arisen because of differences between houses associated with deprivation that are not adequately allowed for by the deprivation score. Copyright 2002 Cancer Research UK
Room To Grow? Facilities Programming for Colleges and Universities.
ERIC Educational Resources Information Center
Thompson, Roger; Adams, Tom
2001-01-01
Asserts that campus space needs could be remedied by moving centrally located service delivery organizations, such as fleet vehicle maintenance facilities. Describes the process of operational and space needs assessment; this process provides information that enables architects to plan for appropriate adjacencies, correct space allocation, and…
3. View toward the southeast corner of the building showing ...
3. View toward the southeast corner of the building showing the south (alley) side on the left and the east (suballey) side on the right. The second story contained 'furnished rooms.' Credit GADA/MRM. - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information... Administration (NOAA), Commerce. ACTION: Notice. SUMMARY: The Department of Commerce, as part of its continuing... Clearance Office, Department of Commerce, Room 6616, 14th and Constitution Avenue NW., Washington, DC 20230...
75 FR 30303 - Importation of Peppers From Panama
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... reading room). The updated PRA, titled ``Importation of Fresh Pepper-Capsicum annuum L., Capsicum baccatum L., Capsicum chinense Jacq., Capsicum frutescens L., and Capsicum pubescens Ruiz & Pav.-Fruit with... to occur in Central America. In addition, we found no evidence that this virus affects Capsicum spp...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
... order are plastic and vinyl covered paper clips, butterfly clips, binder clips, or other paper fasteners... order is revoked. Parties can obtain a public copy of the I&D Memo from the Central Records Unit, room...
7 CFR 3560.408 - Lease of security property.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Lease of security property. 3560.408 Section 3560.408 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF... facilities related to a housing project (e.g., central kitchens, recreation facilities, laundry rooms, and...
VIEW OF PDP ROOM WITH FLOOR AT LEVEL +15 AND ...
VIEW OF PDP ROOM WITH FLOOR AT LEVEL +15 AND SHEAVE RACK ABOVE, LOOKING SOUTH. ON THE LEFT SIDE, CABLES GO THROUGH THE WALL TOWARD THE PDP CONTROL ROOM AREA - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
Kario, Kazuomi; Tomitani, Naoko; Kanegae, Hiroshi; Yasui, Nobuhiko; Nishizawa, Masafumi; Fujiwara, Takeshi; Shigezumi, Takeya; Nagai, Ryozo; Harada, Hiroshi
We have developed a multisensor home and ambulatory blood pressure (BP) monitoring system for monitoring 24-h central and brachial BP variability concurrent with physical activity (PA), temperature, and atmospheric pressure. The new BP monitoring system utilizes our recently developed biological and environmental signal monitoring Information Communication Technology/Internet of Things system, which can simultaneously monitor the environment (temperature, illumination, etc.) of different rooms in a house (entryway, bedroom, living room, bathing room, and toilet), and a wrist-type high-sensitivity actigraph for identifying the location of patients. By collecting both data on BP and environmental parameters, the system can assess the brachial and central hemodynamic BP reactivity profiles of patients, such as actisensitivity (BP change with PA), thermosensitivity (with temperature), and atmospheric sensitivity (with atmospheric pressure). We used this new system to monitor ambulatory BP variability in outpatients with one or more cardiovascular disease (CVD) risk factors both in summer and winter. Actisensitivity (the slope of the regression line of ambulatory BP against the log-physical activity) was higher in winter than summer. By multi-level analysis using the parameters monitored by this system, we estimated the ambulatory BPs under different conditions. The individual time-series big data collected by this system will contribute to anticipation medicine for CVD. Copyright © 2017 Elsevier Inc. All rights reserved.
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.
Effectiveness of in-room air filtration and dilution ventilation for tuberculosis infection control.
Miller-Leiden, S; Lobascio, C; Nazaroff, W W; Macher, J M
1996-09-01
Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.
Effectiveness of In-Room Air Filtration and Dilution Ventilation for Tuberculosis Infection Control.
Miller-Leiden, S; Lohascio, C; Nazaroff, W W; Macher, J M
1996-09-01
Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.
Ong, M; Choo, J T L; Low, E
2004-02-01
Active Hearing Defenders are established hearing protectors with in-built electro-acoustics that shut-off ambient noise while allowing effective communication between users. A blinded, self-controlled trial was conducted among naval servicemen to compare the effectiveness of two types of active hearing defenders (Howard-Leight Thunder TM and COM-55) in relation to passive hearing defenders in an operational environment. Subjects felt that the active hearing defenders were more comfortable, durable, and that the active hearing defenders helped them work better. When subjects were tested with a speech discrimination battery (Central Institute of the Deaf, Spondee Word lists), there was a significant difference (p value of 0.04, using the Kruskall-Wallis ANOVA test) between the two active and the passive defenders. However, no significant difference was found between the two types of active hearing defenders. Active hearing defenders are an acceptable and efficacious means of hearing protection in noisy environments.
LPT. Shield test facility (TAN645 and 646). Sections show relationships ...
LPT. Shield test facility (TAN-645 and -646). Sections show relationships among control rooms, coupling station, counting rooms, pools, equipment rooms, data room and other areas. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-4. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107350 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Bergeron, Vance; Chalfine, Annie; Misset, Benoît; Moules, Vincent; Laudinet, Nicolas; Carlet, Jean; Lina, Bruno
2011-05-01
Evidence has recently emerged indicating that in addition to large airborne droplets, fine aerosol particles can be an important mode of influenza transmission that may have been hitherto underestimated. Furthermore, recent performance studies evaluating airborne infection isolation (AII) rooms designed to house infectious patients have revealed major discrepancies between what is prescribed and what is actually measured. We conducted an experimental study to investigate the use of high-throughput in-room air decontamination units for supplemental protection against airborne contamination in areas that host infectious patients. The study included both intrinsic performance tests of the air-decontamination unit against biological aerosols of particular epidemiologic interest and field tests in a hospital AII room under different ventilation scenarios. The unit tested efficiently eradicated airborne H5N2 influenza and Mycobacterium bovis (a 4- to 5-log single-pass reduction) and, when implemented with a room extractor, reduced the peak contamination levels by a factor of 5, with decontamination rates at least 33% faster than those achieved with the extractor alone. High-throughput in-room air treatment units can provide supplemental control of airborne pathogen levels in patient isolation rooms. Copyright © 2011 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.
Miller, Holly C; DeWall, C Nathan; Pattison, Kristina; Molet, Mikaël; Zentall, Thomas R
2012-06-01
This study investigated whether initial self-control exertion by dogs would affect behavioral approach toward an aggressive threat. Dogs were initially required to exert self-control (sit still for 10 min) or not (caged for 10 min) before they were walked into a room in which a barking, growling dog was caged. Subject dogs spent 4 min in this room but were free to choose where in the room they spent their time. Approaching the unfamiliar conspecific was the predisposed response, but it was also the riskier choice (Lindsay, 2005). We found that following the exertion of self-control (in comparison with the control condition), dogs spent greater time in proximity to the aggressor. This pattern of behavior suggests that initial self-control exertion results in riskier and more impulsive decision making by dogs.
22 CFR 128.5 - Answer and demand for oral hearing.
Code of Federal Regulations, 2014 CFR
2014-04-01
... of State for Defense Trade Controls, SA-1, Room 1200, Department of State, Washington, DC 20522-0112... for Defense Trade Controls, SA-1, Room 1200, Department of State, Washington, DC 20037. [58 FR 39320... Section 128.5 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS...
144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB ...
144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB (BLDG. 751). PNEUMATIC SUPPLY PANEL ON LEFT; NITROGEN AND HELIUM PIPING AT TOP; PURGE PANEL AT BOTTOM OF PHOTOGRAPH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
15. Historic view of engineer in Building 100 control room ...
15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Elements of a Sound Education.
ERIC Educational Resources Information Center
Brooks, Christopher
2003-01-01
Discusses what do to about the poor acoustics in school multipurpose rooms, asserting that because the auditorium is the most critical function of a typical multipurpose room, the stage house is superficial and noise control is essential. Features to enhance auditorium function include a performance platform and reverberation control. The article…
149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. ...
149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. 751), WITH SKID 2 IN FOREGROUND; FUEL LINE TO LAUNCH VEHICLE ENTERING WALL ON LEFT BEHIND SKID 2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
46 CFR 113.30-5 - Requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SYSTEMS AND EQUIPMENT Internal Communications § 113.30-5 Requirements. (a) Communication. Each vessel must... engine control room. (6) Control room, if the vessel is a mobile offshore drilling unit. (7) The... or spaces used by the emergency squad are not next to the navigating bridge or, on a mobile offshore...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
EDUCATION, CHILDREN AND COMFORT.
ERIC Educational Resources Information Center
Iowa Univ., Iowa City.
TWO SIMILAR CLASSROOMS WERE SET UP IN THE LENNOX LIVING LABORATORY, DES MOINES, IOWA, ONE FOR EXPERIMENTAL GROUPS AND ONE FOR CONTROL GROUPS. TEMPERATURE, AIR CIRCULATION AND HUMIDITY CAN BE CONTROLLED AND MEASURED IN BOTH ROOMS. THE ROOMS ARE OF SIMILAR SIZE, LAYOUT AND CONSTRUCTION, THE THERMAL ENVIRONMENT BEING THE ONLY VARIABLE. THE FOLLOWING…
Comparison of methods to control floor contamination in an animal research facility.
Allen, Kenneth P; Csida, Tarrant; Leming, Jeaninne; Murray, Kathleen; Gauld, Stephen B; Thulin, Joseph
2012-10-01
The authors evaluated the effectiveness of adhesive mats, contamination control flooring, and shoe covers in decreasing the presence of microbial agents on animal holding room floors and footwear. Swab samples taken from animal holding room floors after the use of each product were compared with samples taken from rooms after no products were used. Swab samples were also taken from the heels and soles of the footwear of animal care staff before and after use of each product. The use of contamination control flooring or shoe covers significantly reduced the amount of organic material (as indicated by ATP levels measured by a luminometer) present on floors. Bacterial and ATP contamination of footwear was significantly lower after the use of shoe covers than after the use of adhesive mats or contamination control flooring, and the use of shoe covers led to a greater decrease in contamination before and after use than did use of either of the other two products. Although shoe covers were superior to both adhesive mats and contamination control flooring for decreasing contamination of animal room floors and footwear, facilities must take into account the contamination control standards required, the cost of the product, and the labor and time associated with product use when deciding which contamination control practices to implement.
123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ...
123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ON LEFT; HYDRAULIC CONTROL PANEL FOR UMBILICAL MAST AND TRENCH DOORS IN CENTER OF ROOM, FACING WEST. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
NASA Astrophysics Data System (ADS)
Kim, K. H.; Lim, C. H.; Lee, J. G.; Lee, M. K.; Rhee, C. K.
2013-10-01
The microstructure and growth characteristics of Zircaloy-4 joints brazed by a Zr48Ti16Cu17Ni19 (at.%) amorphous filler metal have been investigated with regard to the controlled isothermal solidification and intermetallic formation. Two typical joints were produced depending on the isothermal brazing temperature: (1) a dendritic growth structure including bulky segregation in the central zone (at 850 °C), and (2) a homogeneous dendritic structure throughout the joint without segregation (at 890 °C). The primary α-Zr phase was solidified isothermally, nucleating to grow into a joint with a cellular or dendritic structure. Also, the continuous Zr2Ni and particulate Zr2Cu phases were formed in the segregated center zone and at the intercellular region, respectively, owing to the different solubility and atomic mobility of the solute elements (Ti, Cu, and Ni) in the α-Zr matrix. A disappearance of the central Zr2Ni phase was also rate-controlled by the outward diffusion of the Cu and Ni elements. When the detrimental Zr2Ni intermetallic phase was eliminated by a complete isothermal solidification at 890 °C, the strengths of the joints were high enough to cause yielding and fracture in the base metal, exceeding those of the bulk Zircaloy-4, at room temperature as well as at elevated temperatures (up to 400 °C).
Staphylococcus aureus Recovery From Environmental and Human Locations in 2 Collegiate Athletic Teams
Oller, Anna R.; Province, Larry; Curless, Brian
2010-01-01
Abstract Context: Staphylococcus aureus is spread via direct contact with persons and indirect contact via environmental surfaces such as weight benches. Athletes participating in direct-contact sports have an increased risk of acquiring S aureus infections. Objective: To determine (1) potential environmental reservoirs of S aureus in football and wrestling locker rooms and weight rooms, (2) environmental bacterial status after employing more stringent cleaning methods, (3) differences in colonization rates between athletes and nonathletes, (4) exposed body locations where Staphylococcus was recovered more frequently, and (5) personal hygiene practices of athletes and nonathletes. Design: Cross-sectional study. Setting: Locker room and strengthening and conditioning facilities at a National Collegiate Athletic Association Division II university. Patients or Other Participants: Collegiate football players and wrestlers, with nonathlete campus residents serving as the control group. Intervention(s): Infection control methods, education of the custodial staff, and education of the athletes regarding the Centers for Disease Control and Prevention guidelines for infection prevention. Main Outcome Measure(s): Cultures were taken from the participants' noses, fingertips, knuckles, forearms, and shoes and from the environment. Results: Before the intervention, from the 108 environmental samples taken from the football locker room and weight room, 26 (24%) contained methicillin-susceptible S aureus (MSSA) and 33 (31%) contained methicillin-resistant S aureus (MRSA). From the 39 environmental samples taken from the wrestling locker room and pit areas, 1 (3%) contained MSSA and 4 (10%) contained MRSA. The MRSA rates were different between the 2 locations according to a χ2 test (P = .01). Seven MRSA isolates were recovered from football players and 1 from a wrestler; no MRSA isolates were recovered from the control group. The fingertip location of S aureus recovery from football players was significant when compared with both other locations in football players and fingertips in wrestlers and the control group (P < .05). Football players and wrestlers shared more personal items than the control group (P < .05). After the intervention, the football locker room and weight room samples were negative for S aureus. Conclusions: Intact strengthening and conditioning equipment, proper hygiene, and proper disinfection methods lowered both environmental and human S aureus recovery at 1 university. PMID:20446834
Crew Field Notes: A New Tool for Planetary Surface Exploration
NASA Technical Reports Server (NTRS)
Horz, Friedrich; Evans, Cynthia; Eppler, Dean; Gernhardt, Michael; Bluethmann, William; Graf, Jodi; Bleisath, Scott
2011-01-01
The Desert Research and Technology Studies (DRATS) field tests of 2010 focused on the simultaneous operation of two rovers, a historical first. The complexity and data volume of two rovers operating simultaneously presented significant operational challenges for the on-site Mission Control Center, including the real time science support function. The latter was split into two "tactical" back rooms, one for each rover, that supported the real time traverse activities; in addition, a "strategic" science team convened overnight to synthesize the day's findings, and to conduct the strategic forward planning of the next day or days as detailed in [1, 2]. Current DRATS simulations and operations differ dramatically from those of Apollo, including the most evolved Apollo 15-17 missions, due to the advent of digital technologies. Modern digital still and video cameras, combined with the capability for real time transmission of large volumes of data, including multiple video streams, offer the prospect for the ground based science support room(s) in Mission Control to witness all crew activities in unprecedented detail and in real time. It was not uncommon during DRATS 2010 that each tactical science back room simultaneously received some 4-6 video streams from cameras mounted on the rover or the crews' backpacks. Some of the rover cameras are controllable PZT (pan, zoom, tilt) devices that can be operated by the crews (during extensive drives) or remotely by the back room (during EVAs). Typically, a dedicated "expert" and professional geologist in the tactical back room(s) controls, monitors and analyses a single video stream and provides the findings to the team, commonly supported by screen-saved images. It seems obvious, that the real time comprehension and synthesis of the verbal descriptions, extensive imagery, and other information (e.g. navigation data; time lines etc) flowing into the science support room(s) constitute a fundamental challenge to future mission operations: how can one analyze, comprehend and synthesize -in real time- the enormous data volume coming to the ground? Real time understanding of all data is needed for constructive interaction with the surface crews, and it becomes critical for the strategic forward planning process.
Colucci, G; Giabbani, E; Barizzi, G; Urwyler, N; Alberio, L
2011-08-01
ROTEM(®) is considered a helpful point-of-care device to monitor blood coagulation. Centrally performed analysis is desirable but rapid transport of blood samples and real-time transmission of graphic results are an important prerequisite. The effect of sample transport through a pneumatic tube system on ROTEM(®) results is unknown. The aims of the present work were (i) to determine the influence of blood sample transport through a pneumatic tube system on ROTEM(®) parameters compared to manual transportation, and (ii) to verify whether graphic results can be transmitted on line via virtual network computing using local area network to the physician in charge of the patient. Single centre study with 30 normal volunteers. Two whole blood samples were transferred to the central haematology laboratory by either normal transport or pneumatic delivery. EXTEM, INTEM, FIBTEM and APTEM were analysed in parallel with two ROTEM(®) devices and compared. Connection between central laboratory, emergency and operating rooms was established using local area network. All collected ROTEM(®) parameters were within normal limits. No statistically significant differences between normal transport and pneumatic delivery were observed. Real-time transmission of the original ROTEM(®) curves using local area network is feasible and easy to establish. At our institution, transport of blood samples by pneumatic delivery does not influence ROTEM(®) parameters. Blood samples can be analysed centrally, and results transmitted live via virtual network computing to emergency or operating rooms. Prior to analyse blood samples centrally, the type of sample transport should be tested to exclude in vitro blood activation by local pneumatic transport system. © 2011 Blackwell Publishing Ltd.
Fujita, S; Obara, T; Tanaka, I; Yamauchi, C
1981-01-01
The relation of the rate of circulating air change to room temperature and relative humidity in animal quarters with a central air-conditioning system during heating and cooling seasons was investigated, with the results as follows: During the period of heating, the ambient temperature generally rose with a fall of relative humidity as the number of conditioned air changes per hour was increased. Vertical differences in temperature and humidity between levels of 0.5 and 1.5 m above the floor also diminished with increasing air change rate. This tendency was more conspicuous in small animals rooms with outer walls facing north and west. With increasing rate of air changes, the room temperature was prone to decline and the relative humidity to rise during the period of cooling. There were less vertical differences in temperature and humidity during this period. The velocity of air circulation within the animal quarters and its variations tended to increase progressively with increasing rate of ventilation, though the changes were modest.
Bloomer, Melissa J; Lee, Susan F; Lewis, David P; Biro, Mary Anne; Moss, Cheryle
2016-08-01
The aims are to (1) measure occupancy rates of single and shared rooms; (2) compare single room usage patterns and (3) explore the practice, rationale and decision-making processes associated with single rooms; across one Australian public health service. There is a tendency in Australia and internationally to increase the proportion of single patient rooms in hospitals. To date there have been no Australian studies that investigate the use of single rooms in clinical practice. This study used a sequential exploratory design with data collected in 2014. A descriptive survey was used to measure the use of single rooms across a two-week time frame. Semi-structured interviews were undertaken with occupancy decision-makers to explore the practices, rationale decision-making process associated with single-room allocation. Total bed occupancy did not fall below 99·4% during the period of data collection. Infection control was the primary reason for patients to be allocated to a single room, however, the patterns varied according to ward type and single-room availability. For occupancy decision-makers, decisions about patient allocation was a complex and challenging process, influenced and complicated by numerous factors including occupancy rates, the infection status of the patient/s, funding and patient/family preference. Bed moves were common resulting from frequent re-evaluation of need. Apart from infection control mandates, there was little tangible evidence to guide decision-making about single-room allocation. Further work is necessary to assist nurses in their decision-making. There is a trend towards increasing the proportion of single rooms in new hospital builds. Coupled with the competing clinical demands for single room care, this study highlights the complexity of nursing decision-making about patient allocation to single rooms, an issue urgently requiring further attention. © 2016 John Wiley & Sons Ltd.
114. WEST SIDE OF LIQUID OXYGEN CONTROL ROOM (205). LIQUID ...
114. WEST SIDE OF LIQUID OXYGEN CONTROL ROOM (205). LIQUID NITROGEN (LN2) SUBCOOLER ON LEFT; SKID 8, LIQUID OXYGEN CONTROLLER FOR SWITCHING BETWEEN RAPID-LOAD AND TOPPING ON RIGHT. LIQUID OXYGEN LINE FROM SKID 9A AT RIGHT EDGE OF PHOTO. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
American ASTP crewmen briefed on operation of consoles in main control room
1975-04-25
S75-25619 (25 April 1975) --- A group of American ASTP crewmen is briefed on the operation of the consoles in the main control room at the ASTP flight control center at the Cosmonaut Training Center (Star City) near Moscow. The astronauts were in the Soviet Union for ASTP joint crew training with the Soviet ASTP crewmen. PHOTO COURTESY: USSR ACADEMY OF SCIENCES
77 FR 7244 - Advisory Committee on Women Veterans, Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Women Veterans, Notice of Meeting The...) that the Advisory Committee on Women Veterans will meet on March 20-22, 2012, in room 230 at VA Central... regarding the needs of women Veterans with respect to health care, rehabilitation, compensation, outreach...
76 FR 64184 - Advisory Committee on Women Veterans; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Women Veterans; Notice of Meeting The...) that the Advisory Committee on Women Veterans will meet October 25-27, 2011, in room 930 at VA Central... the needs of women Veterans with respect to health care, rehabilitation, compensation, outreach, and...
76 FR 6197 - Advisory Committee on Women Veterans; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Women Veterans; Notice of Meeting The...) that the Advisory Committee on Women Veterans will meet March 29-31, 2011, in room 230 at VA Central... regarding the needs of women Veterans with respect to health care, rehabilitation, compensation, outreach...
Classroom Amplification: Not Just for the Hearing Impaired Anymore.
ERIC Educational Resources Information Center
Dahlquist, Lori Hubble
This paper discusses the difficulties that children with central auditory processing difficulties can have in the classroom environment. Classroom acoustics that can hinder a child's accessibility to instruction are discussed, including open windows or windows not designed to be acoustic barriers, increased reverberation time in rooms with high…
PBF (PER620) south facade. Camera facing north. Note pedestrian bridge ...
PBF (PER-620) south facade. Camera facing north. Note pedestrian bridge crossing over conduit. Central high bay contains reactor room and canal. Date: March 2004. INEEL negative no. HD-41-2-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
The Design of English Elementary and Primary Schools. A Select Annotated Bibliography.
ERIC Educational Resources Information Center
McNicholas, John, Comp.
School building design in this publication is interpreted as meaning layout and arrangement of rooms rather than as architectural style. Citations are organized under (1) central authority publications, (2) local authority publications, (3) general works, (4) articles in periodicals, and (5) unpublished theses. (Author/MLF)
76 FR 27388 - Special Medical Advisory Group; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
... DEPARTMENT OF VETERANS AFFAIRS Special Medical Advisory Group; Notice of Meeting The Department of Veterans Affairs (VA) gives notice under Public Law 92-463 (Federal Advisory Committee Act) that the Special Medical Advisory Group will meet on May 26, 2011, in Room 830 at VA Central Office, 810 Vermont...
75 FR 70971 - Special Medical Advisory Group; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... DEPARTMENT OF VETERANS AFFAIRS Special Medical Advisory Group; Notice of Meeting The Department of... Special Medical Advisory Group will meet on December 1, 2010, in Room 830 at VA Central Office, 810... on the Blue Ribbon Panel on VA-Medical School Affiliations Report. Any member of the public wishing...
Strength Training: Institutes Pump up Teachers' Roles as Instructional Leaders
ERIC Educational Resources Information Center
Mongiello, Peg; Brady, Deborah; Johnson, George; Berg, Jill Harrison
2009-01-01
In the North Middlesex Regional School District, located in north central Massachusetts near the New Hampshire border, teachers knew that the district had urgent challenges. Isolated programs provided rigor to only some students, student achievement scores showed room for improvement, and a recent accreditation review had raised questions about…
21 CFR 807.90 - Format of a premarket notification submission.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Biologics Evaluation and Research, Food and Drug Administration, 1401 Rockville Pike, suite 200N, Rockville... to the Central Document Room, Center for Drug Evaluation and Research, Food and Drug Administration... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Format of a premarket notification submission. 807...
A Modelica-based Model Library for Building Energy and Control Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wetter, Michael
2009-04-07
This paper describes an open-source library with component models for building energy and control systems that is based on Modelica, an equation-based objectoriented language that is well positioned to become the standard for modeling of dynamic systems in various industrial sectors. The library is currently developed to support computational science and engineering for innovative building energy and control systems. Early applications will include controls design and analysis, rapid prototyping to support innovation of new building systems and the use of models during operation for controls, fault detection and diagnostics. This paper discusses the motivation for selecting an equation-based object-oriented language.more » It presents the architecture of the library and explains how base models can be used to rapidly implement new models. To demonstrate the capability of analyzing novel energy and control systems, the paper closes with an example where we compare the dynamic performance of a conventional hydronic heating system with thermostatic radiator valves to an innovative heating system. In the new system, instead of a centralized circulation pump, each of the 18 radiators has a pump whose speed is controlled using a room temperature feedback loop, and the temperature of the boiler is controlled based on the speed of the radiator pump. All flows are computed by solving for the pressure distribution in the piping network, and the controls include continuous and discrete time controls.« less
Exposure Assessment of a High-energy Tensile Test With Large Carbon Fiber Reinforced Polymer Cables.
Schlagenhauf, Lukas; Kuo, Yu-Ying; Michel, Silvain; Terrasi, Giovanni; Wang, Jing
2015-01-01
This study investigated the particle and fiber release from two carbon fiber reinforced polymer cables that underwent high-energy tensile tests until rupture. The failing event was the source of a large amount of dust whereof a part was suspected to be containing possibly respirable fibers that could cause adverse health effects. The released fibers were suspected to migrate through small openings to the experiment control room and also to an adjacent machine hall where workers were active. To investigate the fiber release and exposure risk of the affected workers, the generated particles were measured with aerosol devices to obtain the particle size and particle concentrations. Furthermore, particles were collected on filter samples to investigate the particle shape and the fiber concentration. Three situations were monitored for the control room and the machine hall: the background concentrations, the impact of the cable failure, and the venting of the exposed rooms afterward. The results showed four important findings: The cable failure caused the release of respirable fibers with diameters below 3 μm and an average length of 13.9 μm; the released particles did migrate to the control room and to the machine hall; the measured peak fiber concentration of 0.76 fibers/cm(3) and the overall fiber concentration of 0.07 fibers/cm(3) in the control room were below the Permissible Exposure Limit (PEL) for fibers without indication of carcinogenicity; and the venting of the rooms was fast and effective. Even though respirable fibers were released, the low fiber concentration and effective venting indicated that the suspected health risks from the experiment on the affected workers was low. However, the effect of long-term exposure is not known therefore additional control measures are recommended.
Wireless local area network in a prehospital environment
Chen, Dongquan; Soong, Seng-jaw; Grimes, Gary J; Orthner, Helmuth F
2004-01-01
Background Wireless local area networks (WLANs) are considered the next generation of clinical data network. They open the possibility for capturing clinical data in a prehospital setting (e.g., a patient's home) using various devices, such as personal digital assistants, laptops, digital electrocardiogram (EKG) machines, and even cellular phones, and transmitting the captured data to a physician or hospital. The transmission rate is crucial to the applicability of the technology in the prehospital setting. Methods We created two separate WLANs to simulate a virtual local are network environment such as in a patient's home or an emergency room (ER). The effects of different methods of data transmission, number of clients, and roaming among different access points on the file transfer rate were determined. Results The present results suggest that it is feasible to transfer small files such as patient demographics and EKG data from the patient's home to the ER at a reasonable speed. Encryption, user control, and access control were implemented and results discussed. Conclusions Implementing a WLAN in a centrally managed and multiple-layer-controlled access control server is the key to ensuring its security and accessibility. Future studies should focus on product capacity, speed, compatibility, interoperability, and security management. PMID:15339336
Wireless local area network in a prehospital environment.
Chen, Dongquan; Soong, Seng-jaw; Grimes, Gary J; Orthner, Helmuth F
2004-08-31
Wireless local area networks (WLANs) are considered the next generation of clinical data network. They open the possibility for capturing clinical data in a prehospital setting (e.g., a patient's home) using various devices, such as personal digital assistants, laptops, digital electrocardiogram (EKG) machines, and even cellular phones, and transmitting the captured data to a physician or hospital. The transmission rate is crucial to the applicability of the technology in the prehospital setting. We created two separate WLANs to simulate a virtual local are network environment such as in a patient's home or an emergency room (ER). The effects of different methods of data transmission, number of clients, and roaming among different access points on the file transfer rate were determined. The present results suggest that it is feasible to transfer small files such as patient demographics and EKG data from the patient's home to the ER at a reasonable speed. Encryption, user control, and access control were implemented and results discussed. Implementing a WLAN in a centrally managed and multiple-layer-controlled access control server is the key to ensuring its security and accessibility. Future studies should focus on product capacity, speed, compatibility, interoperability, and security management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Behrens, V.; Burroughs, G.E.; Crandall, M.
1985-07-01
Environmental and breathing-zone samples were analyzed for nitrous oxide, halogenated anesthetic gases, and ethylene-oxide at Porter Memorial Hospital, Valparaiso, Indiana in April, 1984. The evaluation was requested by the Indiana Occupational Safety and Health Administration to investigate the exposure of operating room personnel to anesthetic gases and central supply employees to ethylene-oxide. The authors conclude that some of the operating room personnel are overexposed to halogenated anesthetic gases and nitrous-oxide. Recommendations include performing better maintenance of the anesthesia equipment, improving the work practices of the anesthesiologists, and periodically checking the ethylene-oxide sterilizer system for leaks.
Using Field-Metered Data to Quantify Annual Energy Use of Portable Air Conditioners
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burke, Thomas; Willem, Henry; Ni, Chun Chun
2014-12-01
As many regions of the United States experience rising temperatures, consumers have come to rely increasingly on cooling appliances (including portable air conditioners) to provide a comfortable indoor temperature. Home occupants sometimes use a portable air conditioner (PAC) to maintain a desired indoor temperature in a single room or enclosed space. Although PACs in residential use are few compared to centrally installed and room air conditioning (AC) units, the past few years have witnessed an increase of PACs use throughout the United States. There is, however, little information and few research projects focused on the energy consumption and performance ofmore » PACs, particularly studies that collect information from field applications of PACs. The operation and energy consumption of PACs may differ among geographic locations and households, because of variations in cooling load, frequency, duration of use, and other user-selected settings. In addition, the performance of building envelope (thermal mass and air leakage) as well as inter-zonal mixing within the building would substantially influence the ability to control and maintain desirable indoor thermal conditions. Lawrence Berkeley National Laboratory (LBNL) conducted an initial field-metering study aimed at increasing the knowledge and data related to PAC operation and energy consumption in the United States.« less
Lin, Jesun; Pai, Jar-Yuan; Chen, Chih-Cheng
2012-12-01
RFID technology, an automatic identification and data capture technology to provide identification, tracing, security and so on, was widely applied to healthcare industry in these years. Employing HEPA ventilation system in hospital is a way to ensure healthful indoor air quality to protect patients and healthcare workers against hospital-acquired infections. However, the system consumes lots of electricity which cost a lot. This study aims to apply the RFID technology to offer a unique medical staff and patient identification, and reacting HEPA air ventilation system in order to reduce the cost, save energy and prevent the prevalence of hospital-acquired infection. The system, reacting HEPA air ventilation system, contains RFID tags (for medical staffs and patients), sensor, and reacting system which receives the information regarding the number of medical staff and the status of the surgery, and controls the air volume of the HEPA air ventilation system accordingly. A pilot program was carried out in a unit of operation rooms of a medical center with 1,500 beds located in central Taiwan from Jan to Aug 2010. The results found the air ventilation system was able to function much more efficiently with less energy consumed. Furthermore, the indoor air quality could still keep qualified and hospital-acquired infection or other occupational diseases could be prevented.
[The development of a distribution system for medical lasers and its clinical application].
Okae, S; Ishiguchi, T; Ishigaki, T; Sakuma, S
1991-02-25
We developed a new laser beam generator system which can deliver laser beam to multiple terminals in distant clinical therapy rooms. The system possesses the distribution equipment by which Nd-YAG laser power is distributed to 8 output terminals under the computer control. Distributed laser beam is delivered to each distant terminal with clinical informations through the optical fiber. In the fundamental studies, possibility of distant transportation of laser beam (30 m) only with 10% loss of energy and without dangerous heating at the connection parts was shown. There seems to be no disadvantage associated with distribution laser beam. In the clinical study, the system was applied to five patients with the symptoms including hemosputum, esophageal stenosis, hemorrhage, lip ulcer and pain. Clinical usefulness of the system was proved. The advantages of the system are as follows: 1. Benefit of cost reduction due to multiple use of single laser source. 2. No necessity of transport of the equipment. 3. No requirement of a wide space to install the equipment in the distant room. 4. Efficient management and maintenance of the system by centralization. Further improvements, e.g., simultaneous use at multiple terminals and elongation of transportation up to 340 m, make the system more useful for clinical application.
LPT. Low power test (TAN640 and 641) floor plan. Cells ...
LPT. Low power test (TAN-640 and -641) floor plan. Cells 101 and 102, control rooms, shielded counting room, generator room, list of room numbers and names. Door details. Ralph M. Parsons 1229-12 ANP/GE-7-640-A-1. November 1956. Approved by INEEL Classification Office for public release. INEEL index code no. 038-0640-00-693-107274 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Human Factors Considerations in System Design
NASA Technical Reports Server (NTRS)
Mitchell, C. M. (Editor); Vanbalen, P. M. (Editor); Moe, K. L. (Editor)
1983-01-01
Human factors considerations in systems design was examined. Human factors in automated command and control, in the efficiency of the human computer interface and system effectiveness are outlined. The following topics are discussed: human factors aspects of control room design; design of interactive systems; human computer dialogue, interaction tasks and techniques; guidelines on ergonomic aspects of control rooms and highly automated environments; system engineering for control by humans; conceptual models of information processing; information display and interaction in real time environments.
The waiting room: vector for health education? The general practitioner's point of view.
Gignon, Maxine; Idris, Hadjila; Manaouil, Cecile; Ganry, Oliver
2012-09-18
General practitioners (GPs) play a central role in disseminating information and most health policies are tending to develop this pivotal role of GPs in dissemination of health-related information to the public. The objective of this study was to evaluate use of the waiting room by GPs as a vector for health promotion. A cross-sectional study was conducted on a representative sample of GPs using semi-structured, face-to-face interviews. A structured grid was used to describe the documents. Quantitative and qualitative analysis was performed. Sixty GPs participated in the study. They stated that a waiting room had to be pleasant, but agreed that it was a useful vector for providing health information. The GPs stated that they distributed documents designed to improve patient care by encouraging screening, providing health education information and addressing delicate subjects more easily. However, some physicians believed that this information can sometimes make patients more anxious. A large number of documents were often available, covering a variety of topics. General practitioners intentionally use their waiting rooms to disseminate a broad range of health-related information, but without developing a clearly defined strategy. It would be interesting to correlate the topics addressed by waiting room documents with prevention practices introduced during the visit.
Motor Room, overall view to the west. The control cabinet ...
Motor Room, overall view to the west. The control cabinet and cement pipes along the south wall are being temporarily stored in the Pumping Plant and are not part of the original equipment - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ
Control Room SOAR offers both classical (on-site) observing (SOAR Control Room, right), and remote tools you need for preparing your science proposal and then carrying out your program. Tracking at Non -Sidereal Rates with SOAR The SOAR telescope has the ability to track at non-sidereal rates, ideal for
IET. Control and equipment building (TAN620). Details and room finish ...
IET. Control and equipment building (TAN-620). Details and room finish schedule. Ralph M. Parsons 902-4-ANP-620-A 322. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0629-00-693-106907 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Credit PSR. This interior view of the building equipment room ...
Credit PSR. This interior view of the building equipment room displays heat exchangers and fan units with insulated piping for hot and cold water at left. Environmental controls and fire fighting system controls appear at right - Jet Propulsion Laboratory Edwards Facility, Propellant Curing Building, Edwards Air Force Base, Boron, Kern County, CA
7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE ...
7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE BUNKER. SHOWS OPENING TO CABLE CHASE, FOUR PULLEY DEVICES, POWER OUTLET, CONDUIT, AND EAST END WALL OF BUNKER. INEL PHOTO NUMBER 65-5441, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
POST-LAUNCH - APOLLO XVI - MSC
1972-04-19
S72-35460 (18 April 1972) --- Dr. J.F. Zieglschmid, M.D., Missions Operations Control Room (MOCR) White Team Surgeon, is seated in the Medical Support Room (MSR) in the Mission Control Center (MCC). He monitors crew biomedical data being received from the Apollo 16 spacecraft on the third day of the lunar landing mission.
INTERIOR VIEW OF TRANSFORMER ROOM FOR FURNACE NO. 2 LOOKING ...
INTERIOR VIEW OF TRANSFORMER ROOM FOR FURNACE NO. 2 LOOKING SOUTHEAST, SHOWING BACK OF CONTROL PANEL AND TRANSFORMER (GE, 3000 KUA water cooled, 60 cycles, U.S. patent 1900585. Transformer dates from 1937, control panel GE resistors) - Braeburn Alloy Steel, Braeburn Road at Allegheny River, Lower Burrell, Westmoreland County, PA
PBF Reactor Building (PER620) as seen from control room window ...
PBF Reactor Building (PER-620) as seen from control room window in PER-619. Photographer stood just outside window. Note exposed communication cables on desert surface. Date: July 2004. INEEL negative no. HD-41-9-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
115. QUALITY CONTROL BOARD FOR MAINTENANCE AND INSPECTION AT SOUTH ...
115. QUALITY CONTROL BOARD FOR MAINTENANCE AND INSPECTION AT SOUTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770), FACING WEST ON EXTERIOR WALL OF QUALITY ASSURANCE ROOM (106A) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Self-Concepts, Locus of Control and Performance Expectations of Learning Disabled Children.
ERIC Educational Resources Information Center
Rogers, H.; Saklofski, D. H.
1985-01-01
Compared to 45 normally achieving students, 45 learning disabled six- to 12-year-olds had lower self-concepts, more external locus of control orientations, and lower performance expectations. Children new to the resource room had higher expectations for future success than Ss with experience in the resource room. (CL)
Credit PSR. Interior view shows the building equipment room as ...
Credit PSR. Interior view shows the building equipment room as seen looking south southwest (206°) from the doorway. The control console contains switches for chiller pumps, fans, heaters, temperature controls, and alarms - Jet Propulsion Laboratory Edwards Facility, Solid Propellant Conditioning Building, Edwards Air Force Base, Boron, Kern County, CA
18. NORTH SIDE OF CONTROL ROOM SHOWING MAIN ELECTRIC PANEL ...
18. NORTH SIDE OF CONTROL ROOM SHOWING MAIN ELECTRIC PANEL ON LEFT, SIGNAL SWITCH BOX IN CENTER, AND SIGNAL RELAYS ON RIGHT. RESISTOR BANK BEHIND ON RIGHT. BRIDGE TENDER'S DESK BEHIND ON SOUTH SIDE. (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
132. WEST SIDE OF MECHANICAL AND ELECTRICAL ROOM (210), LSB ...
132. WEST SIDE OF MECHANICAL AND ELECTRICAL ROOM (210), LSB (BLDG. 751), QUALITY CONTROL BOARD ON LEFT. SOUTH SIDE OF TRANSFORMER ROOM (212) ON RIGHT SIDE OF PHOTOGRAPH, THROUGH OPEN DOORS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Classroom Utilization. AIR 1986 Annual Forum Paper.
ERIC Educational Resources Information Center
Gracie, Larry W.
The use of an index to match classes and classroom space was assessed. The index initiates the use of several variables controlling utilization: number of hours that rooms are scheduled per week, average percentage of occupancy per room, and amount of area per station per room. Interviews with deans covered current classroom assignment…
A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joe, Jeffrey C.
Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model formore » U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.« less
Reijnen, Michel M P J; Zeebregts, Clark J; Meijerink, Wilhelmus J H J
2005-01-01
Operating-room design has not changed significantly since the modern era of surgery began. Minimal invasive, endoscopic, procedures, and evolution of technology will affect operating-room design in the near future. Poor ergonomics has always been one of the major drawbacks of endoscopic surgery. Use of retractable arms and monitors will improve ergonomics of the operating team. Developments in telecommunication will allow surgeons to communicate with colleagues and experts during the procedure in virtually any location around the world, which increases teaching possibilities and procedural safety. Introduction and further development of intraoperative imaging, including real-time, three-dimensional (3-D) reconstructions of patient, and computer-aided surgery offer surgeons the opportunity to train the planned surgical procedure. Moreover, they will improve control and supervision of the procedure in learning situations. The last decade's robotics have made their introduction into the operating rooms. They improve control over the operating-room environment and will facilitate the performance of more complex procedures. However, high costs and lack of force feedback remain its major drawbacks. Improvements of robotic techniques and its implementation into the operating rooms will further guide their design into highly specialized operating units.
Master Console System Monitoring and Control Development
NASA Technical Reports Server (NTRS)
Brooks, Russell A.
2013-01-01
The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.
Fisheye view from the back of the Flight control room of the MCC
1984-10-06
Fisheye view from the back of the Flight Control Room (FCR) of the Mission Control Center (MCC). Visible are the Flight Directors console (left front), the CAPCOM console (right front) and the Payloads console. Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.
Breath sulfides and pulmonary function in cystic fibrosis.
Kamboures, M A; Blake, D R; Cooper, D M; Newcomb, R L; Barker, M; Larson, J K; Meinardi, S; Nussbaum, E; Rowland, F S
2005-11-01
We have determined the concentrations of carbonyl sulfide (OCS), dimethylsulfide, and carbon disulfide (CS(2)) in the breath of a group of cystic fibrosis (CF) patients and one of healthy controls. At the detection sensitivity in these experiments, room air always contained measurable quantities of these three gases. For each subject the inhaled room concentrations were subtracted from the time-coincident concentrations in exhaled breath air. The most significant differences between the CF and control cohorts in these breath-minus-room values were found for OCS. The control group demonstrated a net uptake of 250 +/- 20 parts-per-trillion-by-volume (pptv), whereas the CF cohort had a net uptake of 110 +/- 60 pptv (P = 0.00003). Three CF patients exhaled more OCS than they inhaled from the room. The OCS concentrations in the CF cohort were strongly correlated with pulmonary function. The dimethylsulfide concentrations in breath were greatly enhanced over ambient, but no significant difference was observed between the CF and healthy control groups. The net (breath minus room) CS(2) concentrations for individuals ranged between +180 and -100 pptv. They were slightly greater in the CF cohort (+26 +/- 38 pptv) vs. the control group (-17 +/- 15 pptv; P = 0.04). Lung disease in CF is accompanied by the subsistence of chronic bacterial infections. Sulfides are known to be produced by bacteria in various systems and were therefore the special target for this investigation. Our results suggest that breath sulfide content deserves attention as a noninvasive marker of respiratory colonization.
Park, Ben Joonyeon; Jang, Taekjin; Choi, Jong Woo; Kim, Namkug
2016-01-01
We developed a contactless interface that exploits hand gestures to effectively control medical images in the operating room. We developed an in-house program called GestureHook that exploits message hooking techniques to convert gestures into specific functions. For quantitative evaluation of this program, we used gestures to control images of a dynamic biliary CT study and compared the results with those of a mouse (8.54 ± 1.77 s to 5.29 ± 1.00 s; p < 0.001) and measured the recognition rates of specific gestures and the success rates of tasks based on clinical scenarios. For clinical applications, this program was set up in the operating room to browse images for plastic surgery. A surgeon browsed images from three different programs: CT images from a PACS program, volume-rendered images from a 3D PACS program, and surgical planning photographs from a basic image viewing program. All programs could be seamlessly controlled by gestures and motions. This approach can control all operating room programs without source code modification and provide surgeons with a new way to safely browse through images and easily switch applications during surgical procedures. PMID:26981146
Park, Ben Joonyeon; Jang, Taekjin; Choi, Jong Woo; Kim, Namkug
2016-01-01
We developed a contactless interface that exploits hand gestures to effectively control medical images in the operating room. We developed an in-house program called GestureHook that exploits message hooking techniques to convert gestures into specific functions. For quantitative evaluation of this program, we used gestures to control images of a dynamic biliary CT study and compared the results with those of a mouse (8.54 ± 1.77 s to 5.29 ± 1.00 s; p < 0.001) and measured the recognition rates of specific gestures and the success rates of tasks based on clinical scenarios. For clinical applications, this program was set up in the operating room to browse images for plastic surgery. A surgeon browsed images from three different programs: CT images from a PACS program, volume-rendered images from a 3D PACS program, and surgical planning photographs from a basic image viewing program. All programs could be seamlessly controlled by gestures and motions. This approach can control all operating room programs without source code modification and provide surgeons with a new way to safely browse through images and easily switch applications during surgical procedures.
The Fermilab Accelerator control system
NASA Astrophysics Data System (ADS)
Bogert, Dixon
1986-06-01
With the advent of the Tevatron, considerable upgrades have been made to the controls of all the Fermilab Accelerators. The current system is based on making as large an amount of data as possible available to many operators or end-users. Specifically there are about 100 000 separate readings, settings, and status and control registers in the various machines, all of which can be accessed by seventeen consoles, some in the Main Control Room and others distributed throughout the complex. A "Host" computer network of approximately eighteen PDP-11/34's, seven PDP-11/44's, and three VAX-11/785's supports a distributed data acquisition system including Lockheed MAC-16's left from the original Main Ring and Booster instrumentation and upwards of 1000 Z80, Z8002, and M68000 microprocessors in dozens of configurations. Interaction of the various parts of the system is via a central data base stored on the disk of one of the VAXes. The primary computer-hardware communication is via CAMAC for the new Tevatron and Antiproton Source; certain subsystems, among them vacuum, refrigeration, and quench protection, reside in the distributed microprocessors and communicate via GAS, an in-house protocol. An important hardware feature is an accurate clock system making a large number of encoded "events" in the accelerator supercycle available for both hardware modules and computers. System software features include the ability to save the current state of the machine or any subsystem and later restore it or compare it with the state at another time, a general logging facility to keep track of specific variables over long periods of time, detection of "exception conditions" and the posting of alarms, and a central filesharing capability in which files on VAX disks are available for access by any of the "Host" processors.
Verification and Validation of Digitally Upgraded Control Rooms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boring, Ronald; Lau, Nathan
2015-09-01
As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cyclesmore » of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice—the propensity for late-stage V&V and the use of increasingly complex psychological assessment measures for V&V.« less
Justification of Natural Lighting Management for Workplaces with Displays
NASA Astrophysics Data System (ADS)
Kudryashov, A. V.; Erunova, A. V.; Kalinina, A. S.
2017-11-01
The article is devoted to the study of the influence of the orientation of light apertures (windows) on the distribution of illumination in a room inside the workplaces equipped with displays. The measurements of natural light were carried out in two similar rooms, in the first room the windows are oriented to the north and in the second - to the south. The normative illumination value in a workplace equipped with a personal computer or display must be between 300 and 500 lux. However, during the daytime, the value of natural illumination at the workplace can exceed the normalized value by several times, and in the morning and evening hours is not sufficient. Such distribution of illumination involves the use a combined lighting control system (with daylight time control and switching on artificial lighting in the morning and evening hours). In the article it is justified that the orientation of the windows in the room does not have a significant effect on the distribution of illumination throughout the room which makes it possible not to take into account the restrictions concerning the orientation of the room’s light apertures when combined lighting control systems are used.
Care in a birth room versus a conventional setting: a controlled trial.
Klein, M; Papageorgiou, A; Westreich, R; Spector-Dunsky, L; Elkins, V; Kramer, M S; Gelfand, M M
1984-01-01
A controlled clinical trial was carried out to assess whether a birth room setting would influence the care of mothers and newborns. Of the 163 low-risk women enrolled, 49 (30%) manifested some prenatal risk and were excluded. The remaining 114 were allocated by strict alternation to a birth room or a conventional setting. Of the 56 women allocated to the birth room, 63% of the primiparas and 19% of the multiparas were later transferred. The numbers in the two settings who had oxytocin stimulation, epidural anesthesia, forceps delivery or cesarean section did not show statistically significant differences. The episiotomy rates were slightly lower in the birth room than in the conventional setting, and the rates of an intact perineum were higher in the birth room. Neither the Apgar scores nor the morbidity rates of the infants showed statistically significant differences related to the setting to which the mother had been allocated, although more infants from the conventional setting were admitted to a special care unit. Both "experimental" groups of women less often received routine perineal shaving, enemas or intravenous infusions than did an obstetrically similar nonexperimental comparison group. Despite the apparent inability in this setting for the birth room to influence the rate of major obstetric procedures (except for episiotomy) and outcomes, the authors believe that a birth room is desirable in tertiary care centres as well as in community hospitals. PMID:6388776
STS-116 Flight Controllers on console during mission - WFCR - Orbit 2
2006-12-20
JSC2006-E-54711 (21 Dec. 2006) --- Overall view of the Shuttle Flight Control Room in the Johnson Space Center's Mission Control Center during the final deployment of some small satellites from Space Shuttle Discovery's cargo bay. On a screen in the front of the control room, a Department of Defense pico-satellite known as Atmospheric Neutral Density Experiment (ANDE) is released from the shuttle's payload bay by STS-116 crewmembers and viewed via live television on the ground.
Modeling work of the dispatching service of high-rise building as queuing system
NASA Astrophysics Data System (ADS)
Dement'eva, Marina; Dement'eva, Anastasiya
2018-03-01
The article presents the results of calculating the performance indicators of the dispatcher service of a high-rise building as a queuing system with an unlimited queue. The calculation was carried out for three models: with a single control room and brigade of service, with a single control room and a specialized service, with several dispatch centers and specialized services. The aim of the work was to investigate the influence of the structural scheme of the organization of the dispatcher service of a high-rise building on the amount of operating costs and the time of processing and fulfilling applications. The problems of high-rise construction and their impact on the complication of exploitation are analyzed. The composition of exploitation activities of high-rise buildings is analyzed. The relevance of the study is justified by the need to review the role of dispatch services in the structure of management of the quality of buildings. Dispatching service from the lower level of management of individual engineering systems becomes the main link in the centralized automated management of the exploitation of high-rise buildings. With the transition to market relations, the criterion of profitability at the organization of the dispatching service becomes one of the main parameters of the effectiveness of its work. A mathematical model for assessing the efficiency of the dispatching service on a set of quality of service indicators is proposed. The structure of operating costs is presented. The algorithm of decision-making is given when choosing the optimal structural scheme of the dispatching service of a high-rise building.
Sub-microWatt threshold nanoisland lasers
Jang, Hoon; Karnadi, Indra; Pramudita, Putu; Song, Jung-Hwan; Soo Kim, Ki; Lee, Yong-Hee
2015-01-01
Ultralow threshold nanolasers have been sought after as power efficient light sources in photonic integrated circuits. Here a single-cell nanobeam laser with a nanoisland quantum well is proposed and demonstrated. Continuous operation at 1.5 μm is achieved at room temperature with an ultralow lasing threshold of 210 nW in absorbed power. The size of the active medium is reduced to 0.7 × 0.25 × 0.02 μm3 by removing the absorptive quantum well region surrounding the central cavity. Relatively thick (420 nm) InP slabs are employed to improve the thermal and mechanical characteristics. The nanoisland-based structures will provide a new platform to engineer fundamental light–matter interactions by controlling the size and the location of the nanoemitters, allowing the realization of highly efficient nanophotonic devices. PMID:26391800
Indicator system for advanced nuclear plant control complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1993-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Indicator system for a process plant control complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1993-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Console for a nuclear control complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1993-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Alarm system for a nuclear control complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1994-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Advanced nuclear plant control complex
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1993-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Effects of revised consultation room design on patient-physician communication.
Ajiboye, Folaranmi; Dong, Fanglong; Moore, Justin; Kallail, K James; Baughman, Allison
2015-01-01
To evaluate the impact of a revised consultation room design on patient-physician interaction in an outpatient setting. The growth of ambulatory medical care makes outpatient facilities the primary point of health care contact for many Americans. However, the outpatient consultation room design remains largely unchanged, despite its increased use and the adoption of technology-mediated information sharing in clinical encounter. A randomized controlled trial used a postvisit questionnaire to assess six domains of interest (satisfaction with the visit and the consultation room, mutual respect, patient trust in the physician, communication quality, people-room interaction, and interpersonal-room interaction) in two different room designs (a traditional room and an experimental room in which a pedestal table had replaced the examination table). Interpersonal-room interaction was enhanced in the experimental consultation room when compared to the traditional consultation room (p = .0038). Participants in the experimental consultation room had better access to the computer screen, increased provider information sharing, and more time engaging providers in conversation about information on the monitor. Changing the layout of a consultation room has the potential to improve interpersonal communication through better information sharing. Clinicians who are interested in maximizing the benefits of their clinical encounter should consider changing the layout of their consultation room, especially the positioning of the computer screen. © The Author(s) 2014.
Development of energy saving automatic air conditioner
DOE Office of Scientific and Technical Information (OSTI.GOV)
Okada, T.; Iijima, T.; Kakinuma, A.
1986-01-01
This paper discusses an automatic air conditioner which adopts a new energy saving control method for controlling heat exchange at the heater and the cooler instead of the conventional reheat air-mix one. In this new air conditioner, the cooler does not work when the passenger room is heated and similarly the heater does not work when the passenger room is cooled, minimizing the use rate of the cooler which accounts for the most of the air conditioner's power consumption. Nonetheless, the heat released from the air conditioner to the room can be adjusted smoothly from maximum cooling to maximum heatingmore » just the same as in the conventional type. The results of on-vehicle comparison tests of the above two methods have shown that the energy saving control method saves nearly half of the energy which is consumed in a year with the conventional one, with the room being kept around 25/sup 0/C (77/sup 0/F).« less
Multifamily Individual Heating and Ventilation Systems, Lawrence, Massachusetts (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The conversion of an older Massachusetts building into condominiums illustrates a safe, durable, and cost-effective solution for heating and ventilation systems that can potentially benefit millions of multifamily buildings. Merrimack Valley Habitat for Humanity (MVHfH) partnered with U.S. Department of Energy Building America team Building Science Corporation (BSC) to provide high performance affordable housing for 10 families in the retrofit of an existing mass masonry building (a former convent). The original ventilation design for the project was provided by a local engineer and consisted of a single large heat recovery ventilator (HRV) located in a mechanical room in the basementmore » with a centralized duct system providing supply air to the main living space and exhausting stale air from the single bathroom in each apartment. This design was deemed to be far too costly to install and operate for several reasons: the large central HRV was oversized and the specified flows to each apartment were much higher than the ASHRAE 62.2 rate; an extensive system of ductwork, smoke and fire dampers, and duct chases were specified; ductwork required a significant area of dropped ceilings; and the system lacked individual ventilation control in the apartments« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kroepil, Patric; Lanzman, Rotem S., E-mail: rotemshlomo@yahoo.de; Miese, Falk R.
2011-04-15
We report on percutaneous catheter procedures in the operating room (OR) to assist complicated manual extraction or insertion of pacemaker (PM) and implantable cardioverter defibrillator leads. We retrospectively reviewed complicated PM revisions and implantations performed between 2004 and 2009 that required percutaneous catheter procedures performed in the OR. The type of interventional procedure, catheter and retrieval system used, venous access, success rates, and procedural complications were analyzed. In 41 (12 female and 29 male [mean age 62 {+-} 17 years]) of 3021 (1.4%) patients, standard manual retrieval of old leads or insertion of new leads was not achievable and thusmore » required percutaneous catheter intervention for retrieval of misplaced leads and/or recanalisation of occluded central veins. Thirteen of 18 (72.2%) catheter-guided retrieval procedures for misplaced (right atrium [RA] or ventricle [RV; n = 3], superior vena cava [n = 2], brachiocephalic vein [n = 5], and subclavian vein [n = 3]) lead fragments in 16 patients were successful. Percutaneous catheter retrieval failed in five patients because there were extremely fixed or adhered lead fragments. Percutaneous transluminal angiography (PTA) of central veins for occlusion or high-grade stenosis was performed in 25 patients. In 22 of 25 patients (88%), recanalization of central veins was successful, thus enabling subsequent lead replacement. Major periprocedural complications were not observed. In the case of complicated manual PM lead implantation or revision, percutaneous catheter-guided extraction of misplaced lead fragments or recanalisation of central veins can be performed safely in the OR, thus enabling subsequent implantation or revision of PM systems in the majority of patients.« less
The Postural Responses to a Moving Environment of Adults Who Are Blind
ERIC Educational Resources Information Center
Stoffregen, Thomas A.; Ito, Kiyohide; Hove, Philip; Yank, Jane Redfield; Bardy, Benoit G.
2010-01-01
Adults who are blind stood in a room that could be moved around them. A sound source moved with the room, simulating the acoustic consequences of body sway. Body sway was greater when the room moved than when it was stationary, suggesting that sound may have been used to control stance. (Contains 1 figure.)