Sample records for cercla interim action

  1. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  2. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  3. GUIDE TO CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOIL WASHING - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  4. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOLVENT EXTRACTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation and Liabi...

  5. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: THERMAL DESORPTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  6. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  7. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  8. Interim Guidance: Municipal Solid Waste Exemption under Superfund

    EPA Pesticide Factsheets

    Interim guidance discusses the statutory provisions of CERCLA § 107(p) and identifies some factors to be considered by EPA and DOJ staff in exercising their enforcement discretion of MSW at an NPL site.

  9. Guidance: Policy for Municipality and MSW CERCLA Settlements at NPL Co-Disposal Sites

    EPA Pesticide Factsheets

    Transmittal memorandum and policy supplementing the 9/30/89 Interim Policy on CERCLA Settlements Involving Municipalities and Municipal Wastes. 1998 MSW Policy states that EPA will continue its policy of generally not identifying generators and transporters of MSW as PRPs at NPL sites.

  10. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less

  11. 40 CFR Appendix B to Part 307 - Claim for CERCLA Response Action

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Claim for CERCLA Response Action B Appendix B to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. B Appendix B to Part 307—Claim for CERCLA...

  12. 40 CFR Appendix B to Part 307 - Claim for CERCLA Response Action

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Claim for CERCLA Response Action B Appendix B to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND..., AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. B Appendix B to Part 307—Claim for CERCLA...

  13. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... under section 311 of the Clean Water Act where the release poses an immediate and significant threat to... to CERCLA wastes from cleanup actions based on CERCLA decision documents signed or consent decrees lodged after October 17, 1986 (“post-SARA CERCLA wastes”) as well as those based on CERCLA decision...

  14. Remedying CERCLA`s natural resource damages provision: Incorporation of the public trust doctrine into natural resource damage actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chase, A.R.

    When Congress enacted the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), it ushered in a sweeping approach to controlling the environmental effects of improper hazardous waste disposal. CERCLA`s cleanup provisions, which focus on removal and remediation of hazardous substances from inactive hazardous waste sites, have progressed through more than a decade of litigation and a great deal of public debate. However, CERCLA`s natural resource damage provisions have not shared this same degree of progress.

  15. No Further Action Decision Under CERCLA, Study Area 14, Landfill No. 10, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I I I U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER 5 CERCLA * STUDY AREA 14 LANDFILL NO. 10 U FORT DEVENS , MASSACHUSETTS CONTRACT...45, 1 Feb 93 replaces THAMA Form 45 which is obsolete. U 1I NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 14 LANDFILL NO. 10 3 FORT DEVENS ... FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY ......................................... ES-1 I 1.0

  16. No Further Action Decision Under CERCLA Study Area 43E Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AREA 43E * HISTORIC GAS STATION SITES g FORT DEVENS , MASSACHUSETTS £ I CONTRACT DAAA15-91-D-0008I U.S. ARMY ENVIRONMENTAL CENTER3 ABERDEEN PROVING...FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES I FORT DEVENS , MASSACHUSETTS i I 1 Prepared for: U.S. Army...7053-12 JANUARY 1995 I I. NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS

  17. No Further Action Decision Under CERCLA Study 43R Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    in accordance with the same. E Date RAC Environmental Coordinator m U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRý% Date Fort Devens Remedial...CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I * Prepared for: U.S. Army Environmental Center

  18. No Further Action Decision Under CERCLA Study Area 43Q Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    the same. ,J ES C. CHAMBERS Date RAC Environmental Coordinator I U.S. ENVIRONMENTAL PROTECTION AGENCY -t JAMES P. BYR4 Date3 Fort Devens Refiedial...CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS , CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES 5 FORT DEVENS , MASSACHUSETTS V a I i Prepared for: U.S. Army Environmental Center

  19. Hazardous Waste Management System: Identification and Listing of Hazardous Waste - CERCLA Hazardous Substance Designation-Petroleum Refinery Primary and Other Listings (F037 and F038) - Federal Register Notice, May 13, 1991

    EPA Pesticide Factsheets

    The Agency is promulgating an interim final rule revising the definition of wastes subject to the F037 and F038 listings to state that sludges from non-contact, once-through cooling waters are not included.

  20. 77 FR 66482 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... CERCLA with respect to past response costs, the interim remedy for volatile organic compounds, or for... Justice Department Web site: http://www.usdoj.gov/enrd/Consent_Decrees.html . We will provide a paper copy... United States Treasury. For a paper copy without the exhibits and signature pages, the cost is $5.50...

  1. No Further Action Decision Under Cercla Study Area 61Z Building 202 Historic Motor Pool

    DTIC Science & Technology

    2000-01-01

    appropriate response actions are implemented at Fort Devens under CERCLA. AOC 61Z is the former site of a motor pool at the corner of Carey and St. Mihiel...provided recommendations for response actions with the objective of identifying priorities for environmental restoration at Fort Devens . Areas...a final permit that included a list of Solid Waste Management Units requiring corrective action . In December 1989, Fort Devens was placed on the

  2. RCRA, Superfund and EPCRA hotline training module. Introduction to: Superfund liability, enforcement, and settlements (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    The goal of this module is to describe the liability, enforcement, and settlement provisions of CERCLA; list the CERCLA enforcement mechanisms available to EPA; explain CERCLA sections 104 and 106 provisions; define potentially responsible party; explain CERCLA section 107 liability; cite and locate the relevant CERCLA documents on enforcement and liability; explain the differences between administrative and judicial enforcement and settlement procedures; list and compare the differences between enforcement authorities as they apply to removal and remedial actions; list the key enforcement steps in EPA`s response process; and specify noncompliance penalties and provide statutory citations.

  3. Transmittal of EPA Guidance on the Transfer of Federal Property by Deed Before All Necessary Remedial Action Has Been Taken Pursuant to CERCLA Section 120(h)(3)

    EPA Pesticide Factsheets

    This guidance is for the EPA Regions to use when reviewing requests from federal departments and agencies that are transferring property to defer the CERCLA Section 120(h)(3) covenant that all necessary remedial actions have been taken.

  4. No Further Action Decision Under CERCLA, Study Area 31, Moore Army Airfield Fire Fighting Training Area, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    FURTHER ACTION DECISION UNDER CERCLAI STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA FORT DEVENS , MASSACHUSETFS TABLE OF CONTENTS jSection...Inc. 31DD.DOC 6917.11 111,, NO FURTHER ACTION DECISION UNDER CERCLA I STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA 3 FORT DEVENS ...Fire Fighting Training Area) at Fort Devens , Massachusetts, have resulted in the decision that no further studies or remediation are required at this

  5. STABILIZATION/SOLIDIFICATION OF CERCLA AND RCRA WASTES

    EPA Science Inventory

    This Handbook provides U.S. EPA regional staff responsible for reviewing CERCLA remedial action plans and RCRA permit applications with a tool for interpreting information on stabilization/solidification treatment. As a practical day-to-day reference guide, it will also provide t...

  6. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutionsmore » to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.« less

  7. 40 CFR 300.3 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waters of the exclusive economic zone, or that may affect natural resources belonging to, appertaining to... governments in the initiation, development, selection, and implementation of response actions, pursuant to CERCLA. (6) Listing of federal trustees for natural resources for purposes of CERCLA and the CWA. (7...

  8. No Further Action Decision Under CERCLA, Study Area 43B, Historic Gas Station Sites, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I U.S. Army EnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA * STUDY AREA 43B HISTORIC GAS STATION SITES U FORT DEVENS , MASSACHUSETTS I I... FORT DEVENS , MASSACHUSETTS I I i * Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91-0008 I Prepared...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY

  9. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO... a settlement under section 122(b)(1) of CERCLA, the Fund shall be available for the costs of any new...

  10. Administrative Settlement Agreement and Order on Consent for Removal Action - CERCLA Docket No. 04-2010-3756

    EPA Pesticide Factsheets

    Contains legal agreement for the Huntsville Gas Company site under CERCLA Sections 104, 106(a), 107, and 122, Huntsville, Madison County, Alabama, November 24, 2009 Region ID: 04 DocID: 10685283, DocDate: 11-24-2009

  11. No Further Action Decision Under CERCLA Study Area 43L Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BY/NE ) Date Fort Devens Remedial Project Manager...CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...DECISION UNDER CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES ! FORT DEVENS , MASSACHUSETTS I I I 5 Prepared for: U.S. Army Environmental Center I

  12. 76 FR 32360 - Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9314-3] Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement AGENCY: Environmental Protection Agency (EPA). ACTION: Notice; correction. SUMMARY: On April 4, 2011, a published notice of a proposed administrative de minimis settlement...

  13. Administrative Settlement Agreement and Order on Consent for Removal Action, CERCLA Docket No. 04-2009-3979, Forshaw Chemicals, Inc.

    EPA Pesticide Factsheets

    Contains legal agreement for the Forshaw Chemicals site under CERCLA Sections 104, 106(a), 107 and 122, Charlotte, Mecklenburg County, North Carolina, August 11, 2009 Region ID: 04 DocID: 10539125, DocDate: 08-11-2009

  14. Institutional Controls and Transfer of Real Property under CERCLA Section 120(h)(3)(A), (B) or (C)

    EPA Pesticide Factsheets

    This document provides guidance to the EPA on the exercise of EPA's discretion under CERCLA section 120(h)(3)(A),(B), or (C) when EPA is called upon to evaluate institutional controls as part of a remedial action.

  15. 76 FR 6780 - Agency Information Collection Activities OMB Responses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Action Plan/Activity Integration Plan (CAP/AIP) Reporting System; was approved on 01/06/2011; OMB Number... without change. EPA ICR Number 1445.09; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40... change. EPA ICR Number 1445.10; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40 CFR 302...

  16. 77 FR 51534 - Notice of Proposed Prospective Purchaser Agreement Pursuant to the Comprehensive Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... (``CERCLA''), and the Solid Waste Disposal Act AGENCY: Environmental Protection Agency (EPA). ACTION: Notice..., Compensation, and Liability Act of 1980, as amended (``CERCLA''), and the Solid Waste Disposal Act, commonly... solid waste management units (``SWMUs'') and evaluate remedy options. Both permits have been extended by...

  17. No Further Action Decision Under CERCLA Study Area 43K Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    with the same. AMES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRNE Date Fort Devens l(emedial...STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...Distribution Unlimited U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43K HISTORIC GAS STATION SITES FORT DEVENS ,9

  18. 75 FR 8346 - Proposed CERCLA Administrative Settlement; Anderson-Calhoun Mine and Mill Site, Leadpoint, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ...-Calhoun Mine and Mill Site, Leadpoint, WA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...-Calhoun Mine and Mill Site in Leadpoint, Washington, with settling party Blue Tee Corporation. The... Anderson-Calhoun Mine and Mill Site in Leadpoint, Washington, EPA Docket No. CERCLA-10-2010-0105 and should...

  19. 78 FR 79319 - Amendment to Standards and Practices for All Appropriate Inquiries Under CERCLA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... specific aspects of this rule, contact Patricia Overmeyer, Office of Brownfields and Land Revitalization... with a brownfields grant awarded under CERCLA section 104(k)(2)(B)(ii) may be affected by today's action. This includes state, local and tribal governments that receive brownfields site assessment grants...

  20. 76 FR 69733 - Proposed CERCLA Administrative Cost Recovery Settlement; Tracy Lead Battery Site, Tracy, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Lead Battery Site in Tracy, Minnesota with the following settling parties: Day Side Recycling... Settlement; Tracy Lead Battery Site, Tracy, MN AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... Tracy Lead Battery Site and EPA Docket No. CERCLA-05-2012-0001 and should be addressed to Steven P...

  1. 40 CFR 35.6340 - Disposal of CERCLA-funded property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... has stopped supporting the project. (b) Supplies. (1) If supplies have an aggregate fair market value.... (2) If the supplies remaining at the end of the project period have an aggregate fair market value of... actions at the direction of EPA: (i) Use the supplies on another CERCLA project and reimburse the original...

  2. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  3. Removal of the Plutonium Recycle Test Reactor - 13031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herzog, C. Brad; Guercia, Rudolph; LaCome, Matt

    2013-07-01

    The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associatedmore » underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)« less

  4. CERCLIS Non-NPL Removal Sites in US EPA Region 3

    EPA Pesticide Factsheets

    This data layer contains point locations of waste sites throughout EPA Region 3 that have come under the jurisdiction of CERCLA. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, also known as Superfund) in response to a growing national concern about the release of hazardous substances from abandoned waste sites. Under CERCLA, Congress gave the federal government broad authority to regulate hazardous substances, to respond to hazardous substance emergencies, and to develop long-term solutions for the Nation's most serious hazardous waste problems. The 1980 law requires the parties responsible for the contamination to conduct or pay for the cleanup. If the Environmental Protection Agency's (EPA's) efforts to take an enforcement action for the cleanup are not successful, the federal government can clean up a site using the CERCLA Trust Fund. If the Superfund program conducts the cleanup, the government can take court action against responsible parties to recover up to three times the cleanup costs. These sites do not meet the requirements for the National Priority List, but are still part of the CERCLA list. The National Priority List is intended primarily to guide the EPA in determining which sites warrant further investigation. Some of these waste sites are also known as removal sites, where waste and/or soils are transported away from the site. This point location data was extracted by US EPA Region 3 pe

  5. Administrative Settlement Agreement and Order on Consent for Removal Action, in the Matter of: Forshaw Chemicals Site, Charlotte, Mecklenburg County, North Carolina, Forshaw Chemicals, Inc. Respondent, CERCLA DOCKET NO. 04-2009-3979

    EPA Pesticide Factsheets

    Contains legal agreement for the Forshaw Chemicals site under CERCLA Sections 104, 106(a), 107 and 122, Charlotte, Mecklenburg County, North Carolina, August 17, 2009 Region ID: 04 DocID: 10427285, DocDate: 08-17-2009

  6. Guidance: CERCLA Section 106 Judicial Actions

    EPA Pesticide Factsheets

    This guidance provides criteria for consideration in selecting and initiating Section 106 judicial actions. The guidance also identifies and discusses issues that should be considered in preparation of a Section 106 referral.

  7. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  8. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  9. No Further Action Decision Under CERCLA Study Area 43N Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I . Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91...DECISION UNDER CERCLA STUDY AREA 43N HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS U Section Title Page No. EXECUTIVE SUMMARY

  10. DEACTIVATION AND DECOMMISSIONING ENVIRONMENTAL STRATEGY FOR THE PLUTONIUM FINISHING PLANT COMPLEX, HANFORD NUCLEAR RESERVATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hopkins, A.M.; Heineman, R.; Norton, S.

    Maintaining compliance with environmental regulatory requirements is a significant priority in successful completion of the Plutonium Finishing Plant (PFP) Nuclear Material Stabilization (NMS) Project. To ensure regulatory compliance throughout the deactivation and decommissioning of the PFP complex, an environmental regulatory strategy was developed. The overall goal of this strategy is to comply with all applicable environmental laws and regulations and/or compliance agreements during PFP stabilization, deactivation, and eventual dismantlement. Significant environmental drivers for the PFP Nuclear Material Stabilization Project include the Tri-Party Agreement; the Resource Conservation and Recovery Act of 1976 (RCRA); the Comprehensive Environmental Response, Compensation and Liability Actmore » of 1980 (CERCLA); the National Environmental Policy Act of 1969 (NEPA); the National Historic Preservation Act (NHPA); the Clean Air Act (CAA), and the Clean Water Act (CWA). Recent TPA negotiation s with Ecology and EPA have resulted in milestones that support the use of CERCLA as the primary statutory framework for decommissioning PFP. Milestones have been negotiated to support the preparation of Engineering Evaluations/Cost Analyses for decommissioning major PFP buildings. Specifically, CERCLA EE/CA(s) are anticipated for the following scopes of work: Settling Tank 241-Z-361, the 232-Z Incinerator, , the process facilities (eg, 234-5Z, 242, 236) and the process facility support buildings. These CERCLA EE/CA(s) are for the purpose of analyzing the appropriateness of the slab-on-grade endpoint Additionally, agreement was reached on performing an evaluation of actions necessary to address below-grade structures or other structures remaining after completion of the decommissioning of PFP. Remaining CERCLA actions will be integrated with other Central Plateau activities at the Hanford site.« less

  11. Risk Assessment Approach for the Hanford Site River Corridor Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomson, J.E.; Weiss, S.G.; Sands, J.P.

    2007-07-01

    The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less

  12. Negotiation of a triparty agreement for mixed waste at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGuire, H.E.; Powers, L.L.; Waite, J.L.

    The US Department of Energy (DOE) is currently pursuing the activities necessary to obtain a final operating permit under the Resource Conservation and Recovery Act (RCRA) at Hanford. In addition, the Environmental Restoration Program has been established to conduct inactive site investigations and remedial actions as required under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The anticipated cost for the inactive site cleanup is significant. This was highlighted in a DOE report, where the expected cost for Hanford cleanup is shown as approximately $27 billion. It is imperative that the RCRA closure and corrective action activities be properlymore » integrated with the CERCLA actions to ensure site cleanup is performed in a consistent and cost-effective manner. It is believed that such an objective would best be served through an integrated triparty agreement between the Washington State Department of Ecology (WSDE), the US Environmental Protection Agency (EPA), and the DOE. The WSDE wants clear enforceability in any agreement and believes such enforceability can only be obtained through a judicial consent decree. A consent decree with WSDE for RCRA compliance would have to be separate from a CERCLA Sec. 120 federal facility agreement since EPA cannot enter into a consent decree with another federal agency.« less

  13. 2011 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-03-01

    Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actionsmore » (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2011 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the watershed scale, such as contaminant trends at surface water integration points (IFs). Long-term stewardship (LTS) information used in this report is collected, compiled, and tracked by the WRRP in conjunction with the Bechtel Jacobs Company LLC (BJC) Surveillance and Maintenance (S&M) program, the BJC Radiation Protection Organization at East Tennessee Technology Park (ETTP), ETTP Environmental Compliance Program, B&W Y-12 Liquid Waste Treatment Operations, and UT Battelle Facilities Management Division. Additionally, documentation verifying the implementation of administrative land use controls (LUCs) [i.e., property record restrictions, property record notices, zoning notices, and excavation/penetration permit (EPP) program] is also obtained from many sources throughout the fiscal year (FY), including County Register of Deeds offices for property record restrictions and property record notices, City Planning Commission for zoning notices, and BJC project engineers for EPP program verification. Copies of this documentation are obtained by the WRRP and maintained with the project RER files.« less

  14. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  15. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  16. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  17. 76 FR 41751 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Hipps Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed rule... Hipps Road Landfill Superfund Site (Site) located in Jacksonville, Florida, from the National Priorities..., have determined that all appropriate response actions under CERCLA, other than operation, maintenance...

  18. Installation Restoration Program. Phase I. Records Search, Grand Forks Air Force Base, North Dakota.

    DTIC Science & Technology

    1985-04-01

    and Liability Act . (CERCLA) of 1980, Executive Order 12316, and 40 CFR 300 Subpart F O* (National Oil and Hazardous Substances Contigency Plan...response action on USAF installations under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as...COMBAT ICBT, OPSRA1ON$ MAINI’IPAIICE MAKGIMEIE WPPloTn GROP OIEGRO UP FIOSPITAL, 441 SM)tsU SUPLY 14O SIC 2 SP 447 SM S o u R M I3 1 1 5 E EE2 TENANT

  19. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed rule; notice of... Delete the Hipps Road Landfill Superfund Site (Site) located in Jacksonville, Florida, from the National..., have determined that all appropriate response actions under CERCLA, other than operation, maintenance...

  20. 40 CFR 307.22 - Preauthorization of response actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Eligible Claimants; Allowable Claims; Preauthorization § 307.22 Preauthorization of response actions. (a) No person may submit a claim to the Fund for a... intending to submit a claim to the Fund must fulfill the following requirements before commencing a response...

  1. 40 CFR 300.415 - Removal action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., provision for post-removal site control following a CERCLA Fund-financed removal action at both NPL and non... lead agency shall conduct an engineering evaluation/cost analysis (EE/CA) or its equivalent. The EE/CA...) Fences, warning signs, or other security or site control precautions—where humans or animals have access...

  2. 40 CFR 304.40 - Effect and enforcement of final decision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...

  3. 40 CFR 304.40 - Effect and enforcement of final decision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...

  4. 40 CFR 304.40 - Effect and enforcement of final decision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...

  5. 40 CFR 304.40 - Effect and enforcement of final decision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...

  6. Environmental guidance for public participation in environmental restoration activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liabilitymore » Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.« less

  7. Parker Street Waste Site | New England | US EPA

    EPA Pesticide Factsheets

    2017-09-18

    EPA is conducting sampling and other response actions at Parker Street Waste Site according to its authority under Secton 104 of the Comprehensive Environmental Response, Compensaton, and Liability Act (CERCLA).

  8. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 Eastmore » Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.« less

  9. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  10. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  11. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  12. 40 CFR 35.6325 - Title and EPA interest in CERCLA-funded property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6325...

  13. 40 CFR 307.41 - Subrogation of claimants' rights to the Fund.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... claimants' rights to the Fund. (a) The United States acquires by subrogation all rights of the claimant to... CERCLA for the release giving rise to the response action. (b) Claimants shall assist in any cost recovery action that may be initiated by the United States. The claimant and the claimant's contractors...

  14. 78 FR 70256 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... Indiana Department of Environmental Management (IDEM), has determined that all appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews have been completed...

  15. Enhanced Preliminary Assessment Fort Devens, Massachusetts

    DTIC Science & Technology

    1992-04-30

    remedial programs and RCRA corrective actions at Fort Devens . The areas regulated under RCRA will require closure when no longer in...under which the work in the MEP has been developed requires full integration of CERCLA remedial programs and RCRA corrective actions at Fort Devens ...AREEs 65 and 67, asbestos and radon, respectively. Fort Devens has ongoing programs that deal with these concerns. Any remedial action or disturbance

  16. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the removal process, remedial investigation/ feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response...

  17. SURFACES PRELIMINARY REMEDIATION GOALS FOR RADIONUCLIDES (SPRG)

    EPA Science Inventory

    Internet based Calculational tool for establishing 10(-6) cancer risk based Preliminary Remediation Goals (PRGs) for radioactively contaminated outside hard surfaces (e.g., streets, sidewalks, slabs, and outside of buildings) for CERCLA remedial response actions.

  18. Chemical Safety Alert: First Responders’ Environmental Liability Due To Mass Decontamination Runoff

    EPA Pesticide Factsheets

    CERCLA's good Samaritan provisions protect responders such as the Chemical Weapons Improved Response Team during lifesaving actions. Once imminent threats are addressed, responders should contain contamination and avoid/mitigate environmental consequences.

  19. 76 FR 24481 - Notice of Two Proposed Agreements, a CERCLA Agreement and Order on Consent for Removal Action by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... Prospective Purchaser Agreement Related to Gasoline Service Stations' Underground Storage Tanks Currently...) gasoline service stations currently owned or leased by Caribbean Petroleum Corporation (``CPC'') and...

  20. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  1. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: AEROBIC BIODEGRADATION REMEDY SCREENING

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (KU FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and L...

  2. EPA Guidance on the Transfer of Federal Property by Deed Before All Necessary Remedial Action Has Been Taken Pursuant to CERCLA Section 120(h)(3) -- (Early Transfer Authority Guidance)

    EPA Pesticide Factsheets

    This guidance addresses the transfer of real property listed on the National Priorities List (NPL) held by a federal agency where the release or disposal of hazardous substances has occurred, but where all necessary remedial action has not yet been taken.

  3. 76 FR 12550 - Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...

  4. PERCHLORATE: Occurrence is Widespread but at Varying Levels; Federal Agencies Have Taken Some Actions to Respond to and Lessen Releases

    DTIC Science & Technology

    2010-08-01

    Massachusetts Military Reservation Army/Air Force Active Groundwater Soil 770 8,060 Remediation under way MA Fort Devens Army Active Groundwater 133...cleanup, known as a remedial action . • CERCLA itself does not establish cleanup standards. Rather, the remedial action chosen by a federal agency...perchlorate contaminated areas, which could determine the need for and feasibility of remedial action . • Edwards Air Force Base. In 1997 and 1998

  5. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  6. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  7. 76 FR 71342 - Proposed CERCLA Administrative Cost Recovery Settlement; River Forest Dry Cleaners Site, River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    .... After EPA received an email from a concerned teacher, U.S. EPA conducted indoor air and sub-slab samples... indicate any level of contamination that warranted a removal action. The removal assessment was completed...

  8. 77 FR 67396 - Notice of Lodging of Proposed Consent Decree Under The Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... lawsuit entitled United States v. Index Sportsmen, Inc. (aka Index Sportsmen Club), Civil Action No. 12-1949. The United States filed this CERCLA lawsuit on behalf of the United States Forest Service. The...

  9. 76 FR 46355 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... (Caltrans), pursuant to 23 USC 327, and Other Federal Agencies. SUMMARY: The FHWA, on behalf of Caltrans, is... (CERCLA) [42 USC 9601-9675]; Resource Conservation and Recovery Act of 1976 (RCRA) 11. E.O. 11988...

  10. 78 FR 20642 - Notice of Proposed CERCLA Agreement and Order on Consent for Removal Action by Bona Fide...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Fernando Valley Area 2 Superfund Site, Glendale Chromium Operable Unit, 264 W. Spazier Ave., Burbank... Site, Glendale Chromium Operable Unit, located at 264 W. Spazier Ave., Burbank, California. Under the...

  11. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  12. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  13. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  14. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  15. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  16. 77 FR 38802 - Proposed CERCLA Administrative Cost Recovery Settlement; Standex International Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Settlement; Standex International Corporation AGENCY: Environmental Protection Agency. ACTION: Notice; request for public comment. SUMMARY: Notice is hereby given of a proposed administrative settlement for... following settling party: Standex International Corporation. The settlement requires the settling party to...

  17. 40 CFR 35.6230 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Response Actions Core Program Cooperative Agreements § 35.6230 Application requirements. To receive a Core... number of products to be completed, and a schedule for implementation. Eligible activities under Core... to sustain and increase recipient involvement in CERCLA implementation, and the impact of Core...

  18. 40 CFR 35.6230 - Application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Response Actions Core Program Cooperative Agreements § 35.6230 Application requirements. To receive a Core... number of products to be completed, and a schedule for implementation. Eligible activities under Core... to sustain and increase recipient involvement in CERCLA implementation, and the impact of Core...

  19. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing themore » extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.« less

  20. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documentsmore » the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.« less

  1. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview ofmore » the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.« less

  2. 76 FR 14968 - Proposed CERCLA Administrative Cost Recovery Settlement; Eugenio Painting Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Settlement; Eugenio Painting Company AGENCY: Environmental Protection Agency. ACTION: Notice; request for... proposed administrative settlement for recovery of past response costs concerning the Industrial Street... settlement requires the settling party to pay $20,000 to the Hazardous Substance Superfund. The settlement...

  3. 75 FR 49414 - Cooperative Agreements and Superfund State Contracts for Superfund Response Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... revisions affect States, Indian Tribes, intertribal consortia, and political subdivisions. The revisions... political subdivision participation in CERCLA implementation: Cooperative Agreements and Superfund State... funds to a State, political subdivision, or Indian Tribe that assumes responsibility as the lead or...

  4. 40 CFR 35.419 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... enhance the response program of the State; capitalize a revolving loan fund for Brownfield remediation under section 104(k)(3) of CERCLA; or purchase insurance or develop a risk sharing pool, an indemnity pool, or insurance mechanism to provide financing for response actions under a State response program. ...

  5. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  6. Guidance for Mitigating Environmental Concerns During Range Siting

    DTIC Science & Technology

    2006-12-01

    facilities, processing plants, and landfills . CERCLA authorizes two kinds of response actions: (1) Short-term remov- als, where actions may be taken to...on a slightly higher elevation than the positions to minimize earthwork. Avoid siting berms on crests of high hills, mesas, or ridges, as these...Observing existing vegetation on potential sites is also an important as- sessment tool. Soils with thick vegetative cover are capable of supporting

  7. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  8. 75 FR 48895 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Intent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Rogers Road Municipal Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed... Delete the Rogers Road Municipal Landfill Superfund Site located near Jacksonville, Pulaski County... CERCLA, other than operation and maintenance and five-year reviews, have been completed. However, this...

  9. 40 CFR 300.700 - Activities by other persons.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... action is conducted in accordance with the preauthorization decision document, and costs are reasonable... preauthorization decision document. (8) For a claim to be awarded under section 111 of CERCLA, EPA must certify that the costs were necessary and consistent with the preauthorization decision document. (e) Section...

  10. Consent Decree for RD/RA for OU-4 - Weyerhaeuser Co. Plymouth Treating Plant. Civil Action Number 4:08-CV-179-D

    EPA Pesticide Factsheets

    Contains legal agreement for the Domtar Paper Company LLC (formerly Weyerhaeuser Company) site under CERCLA Sections 106 and 107, Martin County, North Carolina, January 7, 2009 DocID: 10452888, DocDate: 01-07-2009

  11. 40 CFR 35.736 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish or enhance the response program of the Tribe; capitalize a revolving loan fund for brownfield remediation under section 104(k)(3) of CERCLA; or purchase insurance or develop a risk sharing pool, an indemnity pool, or insurance mechanism to provide financing for response actions under a Tribal response...

  12. Administrative Settlement Agreement and Order on Consent for Removal Action - Kentucky Wood Preserving Superfund Site. Docket No. 04-2009-3762

    EPA Pesticide Factsheets

    Contains legal agreement for the Kentucky Wood Preserving Superfund site under CERCLA Sections 104, 106(a), 107 and 122, Winchester, Kentucky, February 9, 2009 Region ID: 04 DocID: 10452978, DocDate: 02-09-2009

  13. Guidance document publications list - Office of Environmental Policy and Assistance RCRA/CERCLA Division (EH-413)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This document provides a listing of Guidance Documents from the RCRA/CERCLA Division for August 1995. Documents are listed under the following categories: RCRA Guidance Manuals; RCRA Information Briefs; CERCLA Guidance Manuals; CERCLA Regulatory Bulletins; RCRA/CERCLA Guidance Manuals; TSCA Guidance Manuals; TSCA Information Briefs; and, Cross Cut Manuals.

  14. 76 FR 54223 - Notice of Proposed Administrative Cost Recovery Settlement Pursuant to the Comprehensive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Costs Incurred at Marine Corps Logistics Base Barstow, CA AGENCY: Department of the Navy, DoD. ACTION... Logistics Base, Yermo Annex, Barstow, California, DON CERCLA Administrative Docket No. 2011-0001, pertaining to environmental contamination at the Marine Corps Logistics Base in Barstow, California (the ``Site...

  15. 76 FR 72216 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... DEPARTMENT OF JUSITCE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA'') Notice is hereby given that on November 15, 2011, a... Pennsylvania. In this action under Section 107(a) of the Comprehensive Environmental Response, Compensation...

  16. 40 CFR Appendix C to Part 307 - Notice of Limitations on the Payment of Claims for Response Actions, Which Is To Be Placed in the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Are Added to the Final NPL C Appendix C to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION... ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. C Appendix C to...

  17. 40 CFR Appendix C to Part 307 - Notice of Limitations on the Payment of Claims for Response Actions, Which Is To Be Placed in the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Are Added to the Final NPL C Appendix C to Part 307 Protection of Environment ENVIRONMENTAL PROTECTION... ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES Pt. 307, App. C Appendix C to...

  18. EPA/Navy CERCLA Remedial Action Technology Guide

    DTIC Science & Technology

    1993-11-01

    Pollution 18:25-36, 1988. Control Association, August 19-21, 1985. 11. Nirmalakhandan, N. N. and R. E. Speece. QSAR Model for Predicting Henry’s...Las Vegas , Nevada. May 1988.. 6. Bergstrom, Wayne R., Gray, Donald H. Fly Ash Utilization 12. Handbook - Remedial Action at Waste Disposal Sites in...of the soil piles should be are needed to confirm that the contaminants of concern can be designed as a package. There are computer models available

  19. Termination of Lease and the Transfer of Property Back to the Landowner for the Matagorda, Texas Tethered Aerostat Radar System (TARS) Site

    DTIC Science & Technology

    2010-01-01

    Above-ground Storage Tank CAA Clean Air Act CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response...on Environmental Quality TDLR Texas Department of Licensing and Regulation THC Texas Historical Commission TPWD Texas Parks and... Storage Tank FINDING OF NO SIGNIFICANT IMPACT 1.0 NAME OF THE PROPOSED ACTION Environmental Assessment (EA) for the proposed action to terminate the

  20. 40 CFR Appendix D to Part 307 - Notice of Limitations on the Payment of Claims for Response Actions Which Is To Be Placed in...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Notice of Limitations on the Payment of Claims for Response Actions Which Is To Be Placed in Public Dockets D Appendix D to Part 307... (CERCLA) CLAIMS PROCEDURES Pt. 307, App. D Appendix D to Part 307—Notice of Limitations on the Payment of...

  1. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less

  2. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  4. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC...

  5. Report of the Michigan Interim Action Committee on Indian Problems.

    ERIC Educational Resources Information Center

    Adams, Doris; And Others

    Stressing the importance of American Indian involvement in affairs affecting Michigan's Indian population, this report by the Interim Action Committee on Indian Problems presents recommendations relative to education, employment, health, and the Commission on Indian Affairs. Recommendations for the commission emphasize: leadership at the local,…

  6. 40 CFR 304.40 - Effect and enforcement of final decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA or any other applicable statute, regulation or legal theory; or (3) Seek reimbursement from any... applicable statute, regulation or legal theory; or (4) Seek any relief for any violation of criminal law from...

  7. 77 FR 2911 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    .../Sodyeco Superfund Site (Site) located at 11701 Mount Holly Road in Charlotte, North Carolina, from the... appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews, have been...: Martin-Marietta/Sodyeco Superfund Site (Site) located at 11701 Mount Holly Road in Charlotte, North...

  8. 78 FR 49690 - Amendment to Standards and Practices for All Appropriate Inquiries

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... more detailed information on specific aspects of this rule, contact Rachel Lentz, Office of Brownfields... brownfields grant awarded under CERCLA Section104(k)(2)(B)(ii) may be affected by today's action. This includes state, local and Tribal governments that receive brownfields site assessment grants. A summary of...

  9. 78 FR 729 - Leonard Chemical Superfund Site; Catawba, York County, SC; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-7; CERCLA-04-2013-3752] Leonard Chemical Superfund Site... perform a Remedial Action at the Leonard Chemical Superfund Site located in Catawba, York County, South.... Submit your comments by Site name Leonard Chemical Superfund Site by one of the following methods: www...

  10. 78 FR 729 - Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-6; CERCLA-04-2012-3780] Ellman Battery Superfund Site... Action at the Ellman Battery Superfund Site located in Orlando, Orange County, Florida. DATES: The Agency... name Ellman Battery Superfund Site by one of the following methods: www.epa.gov/region4/superfund...

  11. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  12. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonell, M.M.; Peterson, J.M.

    1991-11-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this timemore » has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action.« less

  13. Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’

    EPA Pesticide Factsheets

    Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’`

  14. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Busse, John; Keil, Karen; Staten, Jane

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)« less

  15. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  16. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  17. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  18. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  19. The Evolution of the Trust: A Creative Solution of Trustee Liability under CERCLA

    DTIC Science & Technology

    1993-09-30

    the court in the 1980 condemnation action, which held VNB was the record owner of the landfill, Id. It rejected the argument that collateral estoppel ...for receiving the warranty deed as executor. It arose from the doctrines of res judicata and collateral estoppel from having argued it was an owner in

  20. 75 FR 1082 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA'') Notice is hereby given that on December 22, 2009 a proposed consent decree (``proposed Decree'') in United States v. Thoro Products Company, Civil Action No. 04-M-2330, was lodged with the United...

  1. Recent trends at the state and federal level in accelerating CERCLA clean-ups

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clegg, B.

    Efforts at accelerating remedial action at the federal level focus on the following: the Superfund accelerated clean-up model (SCAM); Brownfields economic redevelopment initiative; guidance documents and policies; and collaboration with state voluntary cleanup programs. At the state level efforts involved in accelerating clean-ups include voluntary clean-up programs and Brownfields initiatives.

  2. 77 FR 46433 - Proposed CERCLA Administrative Cost Recovery Settlements for the Buckbee-Mears Co. Superfund Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Protection Agency (EPA). ACTION: Notice; request for public comment. SUMMARY: Under Section 122(h) of the... costs of marketing and selling the Properties. Any proceeds from the Bank's foreclosure sale remaining... percentage that the following amounts represent in relation to the combined total of said amounts: (1) For...

  3. 75 FR 1413 - Notice of Lodging of Consent Decrees Under The Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decrees Under The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Notice is hereby given that on December 18, 2009, two proposed Consent Decrees in the case of U.S. v. Mascot Mines, Inc., et al., Civil Action No. 08-383-EJL...

  4. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  5. 76 FR 51029 - Proposed CERCLA Administrative Cost Recovery Settlement; Carpenter Avenue Mercury Site, Iron...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... Parties pursuant to Sections 113(f)(2) and 122(h)(4) of CERCLA, 42 U.S.C. 9613(f)(2) and 9622(h)(4). For... Parties that EPA has signed the CERCLA 122(h), 42 U.S.C. 9622(h) Settlement Agreement (Agreement) and the... ENVIRONMENTAL PROTECTION AGENCY [FRL-9452-4] Proposed CERCLA Administrative Cost Recovery...

  6. The Challenge of Declining Enrolments. Critical Emerging Problems and Recommendations for Immediate Action. Interim Report No. 2. [La Baisse des Effectifs Scolaires. Problemes Critiques et Recommandations pour une Action Immediate. Rapport Preliminaire No. 2].

    ERIC Educational Resources Information Center

    Jackson, Robert W. B.

    This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…

  7. Superfund record of decision (EPA Region 4): T. H. Agriculture and Nutrition Site, operable unit 1, Montgomery, AL, April 17, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.

  8. Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    More than 200 contaminated sites created by past waste management practices have been identified at the Y-12 Plant. Many of the sites have been grouped into operable units based on priority and on investigative and remediation requirements. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines andmore » requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions.« less

  9. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  10. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  11. Clarification of CERCLA Entry Policy

    EPA Pesticide Factsheets

    This memorandum provides Regional Counsel with clarification on EPA’s Policy: “Entry and Continued Access Under CERCLA.” The Policy focuses on consensually gaining access for CERCLA activities at a particular location.

  12. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less

  13. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  14. Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. P. Floerke

    Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idahomore » State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.« less

  15. RCRA, Superfund and EPCRA hotline training module. Introduction to: CERCLA and EPCRA release reporting requirements (CERCLA section 103 and EPCRA section 304)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    The release reporting requirements set out in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA) enable federal, state, and local authorities to effectively prepare for and respond to chemical accidents. This module reviews the regulations found at 40 CFR Part 302 promulgated pursuant to CERCLA section 103, and the regulations found at 40 CFR section 355.40 promulgated pursuant to EPCRA section 304. The goal of this module is to explain the notification requirements triggered by releases of CERCLA hazardous substances and EPCRA-designated extremely hazardous substances (EHSs).

  16. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...

  17. Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-Than-Air, and Heavier-Than-Air Military Family Housing Areas

    DTIC Science & Technology

    2006-08-01

    storm water system or connections would be designed and constructed to comply with current VDES regulations. The No Action discussion for a storm...3-11 3.5.6 Transportation System .............................................................................. 3...Waste Systems of Virginia CAA Clean Air Act CDP Community Development Plan CEQ Council on Environmental Quality CERCLA Comprehensive Environmental

  18. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  19. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  20. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  1. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization...

  2. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  3. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  4. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  5. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  6. 33 CFR 153.109 - CERCLA delegations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false CERCLA delegations. 153.109 Section 153.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION CONTROL OF POLLUTION BY OIL AND HAZARDOUS SUBSTANCES, DISCHARGE REMOVAL General § 153.109 CERCLA...

  7. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false CERCLA delegations. 1.01-70 Section 1.01-70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL GENERAL PROVISIONS Delegation of Authority § 1.01-70 CERCLA delegations. (a) For the purpose of this...

  8. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false CERCLA delegations. 1.01-70 Section 1.01-70 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL GENERAL PROVISIONS Delegation of Authority § 1.01-70 CERCLA delegations. (a) For the purpose of this...

  9. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Relationship to the CERCLA natural..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for...

  10. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Relationship to the CERCLA natural..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for...

  11. 75 FR 77733 - Federal Acquisition Regulation; Preventing Abuse of Interagency Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments. SUMMARY: The..., including economies and efficiencies and the ability to leverage resources. This interim rule, which...

  12. 75 FR 7955 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists..., Engineering Management Branch, Mitigation Directorate, Federal Emergency Management Agency, 500 C Street SW...

  13. 76 FR 49674 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  14. Superfund record of decision (EPA Region 3): Letterkenny Army Depot (PDO and SE Areas), Chambersburg, Franklin County, PA, September 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-01

    The decision document presents the selected remedial action for the Phase 1 Parcels at Letterkenny Army Depot (LEAD), Chambersburg, Pennsylvania. Based on consideration of he CERCLA requirements, the NCP, the detailed analysis of the alternatives using the nine criteria, and public and state comments, the Army and EPA have selected an institutional controls remedy for this Site.

  15. 75 FR 41381 - Private Land Mobile Radio Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...] Private Land Mobile Radio Services AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile...

  16. 75 FR 7956 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA-2010-0003; Internal Agency Docket No. FEMA-B-1073] Changes in Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  17. 76 FR 20556 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  18. 76 FR 43601 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  19. An Overview of In-Stu Treatability Studies at Marshall Space Flight Center, Huntsville, Alabama

    NASA Technical Reports Server (NTRS)

    McElroy, Bill; Keith, Amy; Glasgow, J. K.; Dasappa, Srini; McCaleb, Rebecca (Technical Monitor)

    2001-01-01

    Marshall Space Flight Center (MSFC) is located in Huntsville, Alabama (north-central Alabama), on approximately 1,840 acres near the center of the U.S. Army's Redstone Arsenal (RSA). MSFC is the National Aeronautics and Space Administration's (NASA's) principal propulsion development center. Its scientists, engineers, and support personnel play a major role in the National Space Transportation System by managing space shuttle mission activities, including the microgravity laboratory. In addition, MSFC will be a significant contributor to several of NASA's future programs, including the Reusable Launch Vehicle (X-33), International Space Station, and Advanced X-ray Astrophysics Facility, as well as research on a variety of space science applications. MSFC has been used to develop, test and manufacture space vehicles and components since 1960, when civilian rocketry and missile activities were transferred from RSA to MSFC. In 1994, MSFC was placed on the National Priority List for the management of hazardous waste sites, under the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). One requirement of the CERCLA program is to evaluate the nature and extent of environmental contamination resulting from identified CERCLA sites, assess the public health and environmental risks associated with the identified contamination, and identify potential remedial actions. A CERCLA remedial investigation (RI) for the groundwater system has identified at least five major plumes of chlorinated volatile organic compounds (CVOCs) in the groundwater beneath the facility. These plumes are believed to be the result of former management practices at 14 main facility locations (termed "source areas") where CVOCs were released to the subsurface. Trichloroethene (TCE) is the predominant CVOC and is common to all the plumes. Perchloroethene (PCE) also exists in two of the plumes. In addition to TCE and PCE, carbon tetrachloride and 1,1,2,2-tetrachloroethane are contained in one of the plumes. The CVOCs are believed to exist as dense non-aqueous phase liquids (DNAPLs) beneath many of the source areas.

  20. Health and Environmental Effects Profile for benzotrichloride

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-07-01

    The Health and Environmental Effects Profile for benzotrichloride was prepared to support listings of hazardous constituents of a wide range of waste streams under Section 3001 of the Resource Conservation and Recovery Act (RCRA) and to provide health-related limits for emergency actions under Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency program office files were evaluated as they pertained to potential human health, aquatic life and environmental effects of hazardous waste constituents. Quantitative estimates are presented provided sufficient data are available. Benzotrichloride has been evaluated as a carcinogen.more » The human carcinogen potency factor for benzotrichloride is 12.63 (mg/kg/day) for oral exposure. The Reportable Quantity (RQ) value of 1, 10, 100, 1000 or 5000 pounds is used to determine the quantity of a hazardous substance for which notification is required in the event of a release as specified by CERCLA based on chronic toxicity. The RQ value for benzotrichloride is 10.« less

  1. 75 FR 34117 - Proposed CERCLA Section 122(h) Cost Recovery Settlement for the H.M. Quackenbush, Inc. Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9162-9] Proposed CERCLA Section 122(h) Cost Recovery Settlement for the H.M. Quackenbush, Inc. Superfund Site, Herkimer, Herkimer County, NY AGENCY: Environmental...''), Region II, of a proposed cost recovery settlement agreement pursuant to Section 122(h) of CERCLA, 42 U.S...

  2. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  3. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  4. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  5. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  6. 77 FR 11385 - Security Considerations for Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...

  7. 76 FR 59066 - Notice of Regulatory Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... [No. 2011-N-10] Notice of Regulatory Review Plan AGENCY: Federal Housing Finance Agency. ACTION... of and requesting comments on the FHFA interim regulatory review plan for review of existing... comments on all aspects of the interim regulatory review plan, including legal and policy considerations...

  8. 76 FR 68322 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  9. 75 FR 18082 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  10. 75 FR 29210 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  11. 76 FR 21662 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  12. 75 FR 81889 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  13. 76 FR 21660 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  14. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...

  15. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, IHAAP 12 and 16 Landfills, Karnack, TX, September 27, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the LHAAP 12 and 16 landfills, Longhorn Army Ammunition Plant (LHAAP), Karnack, Texas. The Record of Decision for the sites addresses an Early Interim Remedial Action. The selected remedy consists of a multilayer landfill cap section which includes the following components: Foundation soil layer, Sodium Bentonite Geocomposite Liner, Geosynthetic Membrane Liner, Final soil cover, and Perimeter berms and drainage swales.

  16. Performance assessment for continuing and future operations at Solid Waste Storage Area 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    This radiological performance assessment for the continued disposal operations at Solid Waste Storage Area 6 (SWSA 6) on the Oak Ridge Reservation (ORR) has been prepared to demonstrate compliance with the requirements of the US DOE. The analysis of SWSA 6 required the use of assumptions to supplement the available site data when the available data were incomplete for the purpose of analysis. Results indicate that SWSA 6 does not presently meet the performance objectives of DOE Order 5820.2A. Changes in operations and continued work on the performance assessment are expected to demonstrate compliance with the performance objectives for continuingmore » operations at the Interim Waste Management Facility (IWMF). All other disposal operations in SWSA 6 are to be discontinued as of January 1, 1994. The disposal units at which disposal operations are discontinued will be subject to CERCLA remediation, which will result in acceptable protection of the public health and safety.« less

  17. 76 FR 71465 - Defense Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...

  18. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  19. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  20. 78 FR 38843 - Single Application Option

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Application Option AGENCY: U.S. Copyright Office, Library of Congress. ACTION: Interim final rule. SUMMARY: The U.S. Copyright Office is amending its regulations on an interim basis in order to establish a new... an additional option for individual authors/claimants registering a single (one) work that is not a...

  1. 76 FR 52547 - Importation of Horses From Contagious Equine Metritis-Affected Countries

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Part 93 [Docket No... AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule; delay of enforcement and... additional time to comment on the interim rule and provide the Animal and Plant Health Inspection Service...

  2. 78 FR 24331 - Apricots Grown in Designated Counties in Washington; Temporary Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Docket No. AMS-FV-12-0028... Regulations AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule... the marketing order for apricots grown in designated Counties in Washington. The interim rule...

  3. 75 FR 45678 - Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Document for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability..., Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S... Commission (NRC) prepares and issues Interim Staff Guidance (ISG) documents for fuel cycle facilities. These...

  4. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  5. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...

  6. 76 FR 78465 - Home Mortgage Disclosure (Regulation C)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... 44 U.S.C. 1510. #0; #0;The Code of Federal Regulations is sold by the Superintendent of Documents. #0... Mortgage Disclosure (Regulation C) AGENCY: Bureau of Consumer Financial Protection. ACTION: Interim final... a new Regulation C (Home Mortgage Disclosure). This interim final rule does not impose any new...

  7. 16 CFR 1209.37 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...

  8. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less

  9. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  10. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9707-2] Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of document availability for interim use and public...

  11. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  12. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  13. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provide the following information, where available: (1) The name and location of the facility to which the CERCLA waste is to be shipped; (2) The type and quantity of CERCLA waste to be shipped; (3) The expected... facility is located of major changes in the shipment plan, such as a decision to ship the CERCLA waste to...

  14. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-of-an-Indian-Tribal-area-of-Indian-country transfer of CERCLA waste. 35.6120 Section 35.6120...-of-Indian-country transfer of CERCLA waste. (a) The recipient must provide written notification of off-site shipments of CERCLA waste from a site to an out-of-State or out-of-an-Indian-Tribal-area-of...

  15. 40 CFR 35.6120 - Notification of the out-of-State or out-of-an-Indian-Tribal-area-of-Indian-country transfer of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-of-an-Indian-Tribal-area-of-Indian-country transfer of CERCLA waste. 35.6120 Section 35.6120...-of-Indian-country transfer of CERCLA waste. (a) The recipient must provide written notification of off-site shipments of CERCLA waste from a site to an out-of-State or out-of-an-Indian-Tribal-area-of...

  16. Treatability Study in Support of Intrinsic Remediation for Site ST41. Elmendorf Air Force Base, Anchorage, Alaska

    DTIC Science & Technology

    1995-10-01

    BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system

  17. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCACO8000 L16100000 DX0000] Notice of..., California AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Establishment of Interim Final Supplementary Rules. SUMMARY: In accordance with the Record of Decision for the Sierra Resource Management Plan...

  18. 77 FR 25910 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...

  19. 75 FR 36643 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an...

  20. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...

  1. 78 FR 52079 - Oranges, Grapefruit, Tangerines, and Tangelos Grown in Florida; Relaxing Size and Grade...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... Requirements on Valencia and Other Late Type Oranges AGENCY: Agricultural Marketing Service, USDA. ACTION...). The interim rule reduced the minimum size for Valencia and other late type oranges shipped to... interim rule also lowered the minimum grade for Valencia and other late type oranges shipped to interstate...

  2. 77 FR 66920 - Registration of Claims to Copyright: Group Registration of Serial Issues Filed Electronically

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... LIBRARY OF CONGRESS Copyright Office 37 CFR Part 202 [Docket No. RM 2012-11] Registration of..., Library of Congress. ACTION: Interim regulations. SUMMARY: The Copyright Office is adopting interim..., applicants must still send two complimentary subscription copies of the serial promptly to the Library of...

  3. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  4. Superfund record of decision (EPA Region 3): Dover Air Force Base, Oil/Water Separator at Building 918 (Site ot 40), Kent County, DE, March 28, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    The Record of Decision presents the selected remedial action for the Oil/Water separator at Building 918 Operable Unit (Site OT 40). There are hazardous substances present in the shallow groundwater at levels below those that would cause risk. Additionally, arsenic and lead exist in soils at levels within regional background levels. The site poses a minimal risk to public health, welfare, and the environment. The No Action alternative requires no actions be taken at the site. This alternative serves as a baseline for comparison and CERCLA requires it be evaluated. It is the preferred alternative at this site because themore » other alternatives offer no substantial advantages.« less

  5. 78 FR 78838 - Grant of Interim Extension of the Term of U.S. Patent No. 5,496,801; Recombinant Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Hormone AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term... No. 5,496,801. The patent claims the human biological product recombinant human parathyroid hormone... human parathyroid hormone, was filed on October 24, 2013, and is currently undergoing regulatory review...

  6. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  7. 77 FR 28765 - Homeless Emergency Assistance and Rapid Transition to Housing: Emergency Solutions Grants Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...

  8. Consent Decrees

    EPA Pesticide Factsheets

    EPAs Office of Enforcement and Compliance Assurance (OECA) cases and settlements webpage contains links to selected settlements resolving civil enforcement cases and, in some cases, complaints filed initiating civil judicial and administrative enforcement actions. Typically, the links are to settlements about which we have issued a press release. This is not a complete repository of all enforcement actions taken by or on behalf of EPA. Rather, it represents a subset of enforcement cases, taken civil judicially or administratively, which may be of national interest. Most of the settlements are civil judicial consent decrees resolving alleged violations of environmental laws (e.g., the Clean Air Act, the Clean Water Act). In some instances, the website includes significant enforcement actions resolved by the Environmental Appeals Board (EAB). In addition, please note that the cases and settlements webpage does not include:Most administrative enforcement actions; Most civil judicial cases resolving liability under CERCLA; Criminal enforcement matters.

  9. 49 CFR 190.235 - Civil actions generally.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Civil actions generally. 190.235 Section 190.235... PROCEDURES Enforcement Specific Relief § 190.235 Civil actions generally. Whenever it appears to the... or appropriate, including mandatory or prohibitive injunctive relief, interim equitable relief, civil...

  10. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  11. Land Use in the CERCLA Remedy Selection Process

    EPA Pesticide Factsheets

    This directive presents additional information for considering land use in making remedy selection decisions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at National Priorities List (NPL) sites.

  12. Memorandum of the Establishment of Cleanup Levels for CERCLA Sites with Radioactive Contamination

    EPA Pesticide Factsheets

    This memorandum presents clarifying guidance for establishing protective cleanup levels for radioactive contamination at Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites.

  13. CCSS Literacy and Math Tools: An Interim Report on Implementation and Sustainability during the Pilot Year

    ERIC Educational Resources Information Center

    Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce

    2011-01-01

    This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…

  14. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Federal Facilities

    EPA Pesticide Factsheets

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund, authorizes the President to respond to releases or threatened releases of hazardous substances into the environment.

  15. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiSalvo, Rick; Surovchak, Scott; Spreng, Carl

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less

  16. 76 FR 55061 - Two Proposed CERCLA Administrative Settlement Agreements for Long-Term Access at the Bountiful...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ..., Utah. The proposed Settlement Agreements are with Davis County and Security Investment Ltd... CERCLA civil liability at their respective properties will be resolved. The Settlement Agreements include...

  17. Superfund: CERCLA Overview

    EPA Pesticide Factsheets

    CERCLA, commonly known as Superfund, was enacted by Congress on December 11, 1980. This law created a tax on the chemical and petroleum industries and provided broad Federal authority to respond directly to releases or threatened releases of hazardous subs

  18. Transmittal of guidance on use and enforcement of CERCLA information requests and administrative subpoenas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-08-25

    The directive provides an overview of the information gathering tools under CERCLA section 104(e) and 122(e)(3), and focuses on the steps to be taken throughout the information gathering process to ensure that EPA is in the strongest position possible to enforce the information gathering or subpoena. The guidance replaces existing guidance entitled, Policy on Enforcing Information Requests in Hazardous Waste Cases, dated September 10, 1984, to the extent that the previous guidance addresses information gathering under CERCLA section 104(e), directive no. 9834.4.

  19. [Redacted] Settlement Agreement - Docket No. CERCLA-04-2009-3978 (Appendix A Withheld)

    EPA Pesticide Factsheets

    Contains legal agreement for the Granville High School Mercury Superfund site under CERCLA Section 122(h)(1), Creedmoor, Granville County, North Carolina, November 13, 2009 DocID: 10760173 , DocDate: 11-13-2009

  20. Removal Cost Policy and Operating Procedures (CERCLA)

    DOT National Transportation Integrated Search

    1996-05-24

    CG OSCs, operating under the National Contingency Plan, 40 CFR 300, Subpart E - : Hazardous Substance Response, have access to SUPERFUND/CERCLA Fund on a : reimbursable basis when responding to a hazardous substance incident. EPA annually provides to...

  1. Rural applications of advanced traveler information systems : recommended actions

    DOT National Transportation Integrated Search

    1997-07-01

    The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...

  2. SITE TECHNOLOGY CAPSULE: TEXACO GASIFICATION PROCESS

    EPA Science Inventory

    In 1980, the U.S. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund. to protect human health and the environment from uncontrolled hazardous waste sites. CERCLA was amended by the Superfund Amendments and R...

  3. Impacts of CERCLA Release Notification Requirements on Transportation of Products Containing Hazardous Substances

    DOT National Transportation Integrated Search

    1986-08-01

    In order to determine the regulatory burden imposed by CERCLA release-notification requirements on shippers and carriers handling products containing hazardous substances, eight shippers and seven carriers were interviewed in depth during the summer ...

  4. 76 FR 14659 - Proposed CERCLA Administrative “Cost Recovery” Settlement; The Goldfield Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ..., Kansas City, KS 66101. A copy of the proposed settlement may be obtained from Kathy Robinson, Regional..., Missouri, and EPA Docket No. CERCLA-07-2011-0002, and should be addressed to Kathy Robinson, Regional...

  5. 78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...

  6. 76 FR 26291 - Proposed CERCLA Administrative “Cost Recovery” Settlement; the Doe Run Resources Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ..., Kansas City, KS 66101. A copy of the proposed settlement may be obtained from Kathy Robinson, Regional... County, Missouri, and EPA Docket No. CERCLA-07-2011-0003, and should be addressed to Kathy Robinson...

  7. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent frommore » buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.« less

  8. Superfund Record of Decision (EPA Region 3): Buckingham County Landfill Superfund Site, VA, September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-10-01

    The Record of Decision (ROD) presents the final remedial action selected for the Buckingham County Landfill Superfund Site (Site), located near the town of Sprouse's Corner in Buckingham County, Virginia. The remedial action was chosen in accordance with the requirements of the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA), 42 U.S.C. Section 9601 et. seg., as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 C.F.R. Part 300. The decision document explains the factual and legal basis for selecting the remedial action. Themore » selected remedy includes the two following options, both of which are fully protective of human health and the environment: Monitor the ground water and cap the hazardous waste disposal area; and Implement the source control measures.« less

  9. COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY INFORMATION SYSTEM (CERCLIS)

    EPA Science Inventory

    The Superfund program was created as a result of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA was enacted on 12/11/80, and amended by the Superfund Amendments and Reauthorization Act of 1986. These acts established broad authority for...

  10. The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattlin, E.; Charboneau, S.; Johnston, G.

    2007-07-01

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less

  11. CERCLA and EPCRA Reporting Requirements for Air Releases of Hazardous Substances from Animal Waste at Farms

    EPA Pesticide Factsheets

    Provides an update on a CERCLA/EPCRA final rule that exempted all farms from reporting air releases of hazardous substances from animal waste. Following a court decision, farms must begin reporting these releases to November 15, 2017.

  12. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  13. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  14. 15 CFR 990.20 - Relationship to the CERCLA natural resource damage assessment regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Authorities § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive...

  15. Financial Responsibility Calculator to Accompany Proposed Requirements Under CERCLA Section 108(b) For Classes of Facilities in the Hardrock Mining Industry

    EPA Pesticide Factsheets

    This calculator will help stakeholders (owners and operators) of hardrock mines or mineral processing facilities calculate the amount of financial responsibility they should obtain under the proposed CERCLA 108b requirements

  16. Consolidated List of Lists under EPCRA/CERCLA/CAA §112(r) (March 2015 Version)

    EPA Pesticide Factsheets

    List of Lists was prepared to help firms handling chemicals determine, for a specific chemical, whether they may be subject to the following reporting requirements under Emergency Planning and Community Right-to-Know, CERCLA, and Clean Air Act.

  17. Overview, Analysis and Research Results of a CERCLA Site: A Model Study? and the NAFT Experience

    NASA Technical Reports Server (NTRS)

    Hunt, Clinton, Jr.

    2004-01-01

    THe paper discusses the following: What do we want to accomplish? How do we want to accomplish it? When do we expect to complete each task? CERCLA stands for: Comprehensive, Environmental, Response, Compensation, Liability, and Act.

  18. 48 CFR 1426.7103 - The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (Superfund Minority Contractors Utilization... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7103 The Comprehensive...

  19. Guidance on EPA Concurrence in the Identification of Uncontaminated Parcels under CERCLA Section 120 (h)(4)

    EPA Pesticide Factsheets

    This memorandum addresses the approach EPA should use in determining whether to concur that a parcel has been properly identified by a military service as 'uncontaminated' and therefore transferrable pursuant to CERCLA Section 120 (h)(4).

  20. Superfund record of decision (EPA Region 10): Elmendorf Air Force Base, Operable Unit 2, source area ST41, Anchorage, AK. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    The 13,130-acre Elmendorf Air Force Base (AFB) site is located adjacent to the municipality of Anchorage, Alaska. From 1940 to 1991, Elmendorf AFB used a 20-acre portion of the site, referred to as source area ST41, to store the fuel product JP-4 and aviation gasoline in four 1-million gallon underground tanks. As a result of numerous leaks and above-ground spills since the tanks were installed in the 1940s, USAF conducted investigations through its Installation Restoration Program (IRP). These investigations revealed several hundred thousand gallons of fuel in the ground water and soil. The ROD addresses an interim remedy at Elmendorfmore » AFB. The action is needed to reduce further spread of fuel constituents through the recovery of floating product on the ground water surface, and containment of seeps. Future RODs will include a final remedy for ground water and soil at ST41, as OU2, and will address the other six OUs at the site. The primary contaminants of concern affecting the ground water at ST41 are the compounds in JP-4, especially VOCs such as benzene, toluene, and xylenes. The selected interim remedial action for the site are included.« less

  1. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  2. Administrative Settlement Agreement and Order on Consent for Remedial Investigation/Feasibility Study - Holtra Chem/Honeywell Inc. Superfund Site. CERCLA-04-2009-3980

    EPA Pesticide Factsheets

    Contains legal agreement for the LCP-Holtrachem Superfund site under CERCLA Sections 104, 107, and 122, Riegelwood, Columbus County, North Carolina , September 15, 2009 Region ID: 04 DocID: 10453068, DocDate: 09-15-2009

  3. 75 FR 4071 - Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... (``CERCLA''), notice is hereby given that a proposed administrative cost recovery settlement concerning the T.H. Agriculture and Nutrition LLC former Superfund Site (THAN Site) in Fresno, California was... 107 of CERCLA against the following Respondents: T.H. Agriculture & Nutrition, LLC, Syngenta Crop...

  4. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  5. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  6. 33 CFR 1.01-70 - CERCLA delegations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... health or welfare or the environment because of an actual or threatened release of a hazardous substance... steps as may be necessary to reduce exposure that presents a significant risk to human health, and to eliminate or substantially mitigate that significant risk to human health. (3) Authority, pursuant to CERCLA...

  7. 75 FR 35456 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... and Liability Act (CERCLA) or Superfund, Brownfields Amendments, Section 104(k); Notice of Revisions to FY2011 Guidelines for Brownfields Assessment, Revolving Loan Fund, and Cleanup Grants AGENCY... applicants in preparing proposals for grants to assess and clean up brownfield sites. EPA's Brownfields...

  8. 75 FR 57272 - Proposed CERCLA Administrative Cost Recovery Settlement; Gilberts/Kedzie Site, Village of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9203-6] Proposed CERCLA Administrative Cost Recovery... hereby given of a proposed administrative settlement for recovery of past response costs concerning the... requires the settling parties to pay $3,000.00 to the Hazardous Substance Superfund and additional payments...

  9. Settlement Agreement for Recovery of Past Response Costs at the Georgia-Pacific Hardwood Site, Plymouth, Washington County, North Carolina - Docket Number CERCLA-04-2008-3774

    EPA Pesticide Factsheets

    Contains legal agreement for the Georgia-Pacific Hardwood site under CERCLA Section 122(h)(1), Plymouth, Washington County, North Carolina, September 5, 2008 Region ID: 04 DocID: 10452729, DocDate: 09-05-2008

  10. SITE TECHNOLOGY CAPSULE: METAL-ENHANCED DECHLORI- NATION OF VOLATILE ORGANIC COMPOUNDS USING AN ABOVE-GROUND REACTOR - ENVIROMETAL TECHNOLOGIES, INC.

    EPA Science Inventory

    In 1980 the U.S. Congress passed the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund, to protect human health and the environment from uncontrolled hazardous waste sites. CERCLA was amended by the Superfund Amendments an...

  11. 78 FR 76143 - Proposed CERCLA Settlement Relating to the Paul's Tank Cleaning Service Superfund Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... Paul's Tank Cleaning Service Superfund Site, Burlington County, New Jersey AGENCY: Environmental.... (``Settling Party''). The Settling Party is a potentially responsible party, pursuant to Section 107(a) of CERCLA, and thus is potentially liable for response costs incurred at or in connection Paul's Tank...

  12. Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. B. Mitchem

    2001-08-22

    This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

  13. 10 CFR 1021.211 - Interim actions: Limitations on actions during the NEPA process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... during the NEPA process. While DOE is preparing an EIS that is required under § 1021.300(a) of this part, DOE shall take no action concerning the proposal that is the subject of the EIS before issuing an ROD... which an EIS is being prepared shall not be categorically excluded under subpart D of these regulations...

  14. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  15. Exceptions or alternatives to labeling requirements for products held by the Strategic National Stockpile. Final rule.

    PubMed

    2012-02-06

    The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.

  16. 76 FR 8366 - Science Advisory Board Staff Office; Request for Nominations; SAB Environmental Justice Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Nominations; SAB Environmental Justice Technical Panel AGENCY: Environmental Protection Agency (EPA). ACTION... experts to serve on the SAB Environmental Justice Technical (EJT) Panel. DATES: Nominations should be...) released the Interim Guidance on Considering Environmental Justice During the Development of an Action...

  17. Glossary of CERCLA-related terms and acronyms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-10-01

    This glossary contains CERCLA-related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended, related federal rulemakings (e.g., 40 CFR 300, National Oil and Hazardous Substances Pollution Contingency Plan), assorted guidance documents prepared by the US Environmental Protection Agency (EPA), and DOE Order 5400.4. The source of each term is noted after the term. Terms presented in this document reflect revised and new definitionsmore » published before June 1, 1991. 20 refs.« less

  18. RCRA/UST, Superfund, and EPCRA hotline training module. Introduction to statutory overview of CERCLA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This module presents a brief overview of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), the statute through which Congress established EPA`s hazardous substance release reporting and cleanup program, known as the `Superfund` program. The statute provides the legal authority and general framework for the program, while specific procedural requirements can be found in the regulations and guidance documents. It is vital that Hotline Information Specialist be knowledgeable about the statute itself because it is the primary reference used to answer questions relating to the Superfund program. This module presents information on the CERCLA statute only, notmore » the regulations promulgated pursuant to the statute.« less

  19. Los requisitos de reportes para emisiones al aire de sustancias peligrosas provenientes de desechos animales agrícolas conforme a CERCLA y EPCRA

    EPA Pesticide Factsheets

    Debido a cambios legislativos en la Ley de Apropiaciones Consolidadas, 2018 (Ley Ómnibus), las “emisiones al aire provenientes de desechos animales en una granja” están exentas y no se requiere reportarlas conforme a CERCLA.

  20. 76 FR 73622 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... of Possible Funding Reductions Please describe the effects, if any, of a 10% and 20% reduction in... and Liability Act (CERCLA) or Superfund, Section 128(a); Notice of Grant Funding Guidance for State... provides guidance on eligibility for funding, use of funding, grant mechanisms and process for awarding...

  1. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  2. 75 FR 51482 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Notice is hereby given that on August 11, 2010, a... Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA''), 42 U.S.C. Sec. Sec. 9607(a...

  3. On the brink of reform: Four bills vie for the Superfund reauthorization title

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zodrow, J.J.

    1995-12-01

    After months of hearings in the House of Representatives and the Senate, Congress is poised to reform the Comprehensive Environmental Response, Compensation and Liability Act of 1980. Without CERCLA reauthorization, no federal tax dollars will be allocated to the Superfund for remediating contaminated industrial sites. Authorization to pay into the Superfund expired officially in 1994, and only $2.8 billion remains in the trust fund, enough to run the program through next September at its current annual budget of $1.4 billion. Critics state that Congress acted ambitiously in enacting CERCLA 15 years ago in response to a general belief that onlymore » dozens of contaminated sites existed and could be addressed within a few years. However, the Environmental Protection Agency since 1980 has named 1,300 sites to the National Priorities List. Many contend that the Superfund program was not designed to be a clearinghouse for a multitude of site cleanups. CERCLA`s complicated procedural requirements and taxing transactional costs, some say, were intended to apply to a few, highly toxic sites.« less

  4. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federalmore » rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.« less

  5. HEALTH AND ENVIRONMENTAL EFFECTS DOCUMENT ...

    EPA Pesticide Factsheets

    Health and Environmental Effects Documents (HEEDS) are prepared for the Office of Solid Waste and Emergency Response (OSWER). This document series is intended to support listings under the Resource Conservation and Recovery Act (RCRA) as well as to provide health-related limits and goals for emergency and remedial actions under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency Program Office files are evaluated as they pertain to potential human health, aquatic life and environmental effects of hazardous waste constituents. Several quantitative estimates are presented provided sufficient data are available. For systemic toxicants, these include Reference Doses (RfDs) for chronic and subchronic exposures for both the inhalation and oral exposures. In the case of suspected carcinogens, RfDs may not be estimated. Instead, a carcinogenic potency factor, or q1*, is provided. These potency estimates are derived for both oral and inhalation exposures where possible. In addition, unit risk estimates for air and drinking water are presented based on inhalation and oral data, respectively. Reportable quantities (RQs) based on both chronic toxicity and carcinogenicity are derived. The RQ is used to determine the quantity of a hazardous substance for which notification is required in the event of a release as specified under CERCLA.

  6. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).« less

  7. Superfund record of decision (EPA Region 5): Skinner Landfill, Butler County, Union Township, West Chester, OH. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 78-acre Skinner Landfill site is located in West Chester, Butler County, Ohio. Land use in the immediate vicinity includes business and residential uses to the west and crop farming to the north. The site was used in the past for the mining of sand and gravel, and was operated for the landfilling of a wide variety of materials from approximately 1934 through 1990. Materials deposited onsite include demolition debris, household refuse, and a wide variety of chemical wastes. In 1982, EPA conducted an investigation that showed that the groundwater southeast of the buried waste lagoon was contaminated with VOCs.more » RI studies conducted between 1986 and 1989 investigated the site ground water, surface water, soil, and sediment. In 1990, the state closed the site to further landfilling activities. The ROD is an interim action to protect human health by limiting site access to prevent ingestion of and direct contact with contaminated soil, and to protect the potentially affected users of ground water on and near the site. The primary contaminants of concern affecting the soil and ground water are VOCs, including benzene; organics, including PAHs, PCBs, and pesticides; and metals, including arsenic. The selected interim remedial action for the site are included.« less

  8. Elements of a CERCLA action at a former Army ammunition plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tucker, D.F.; Marotz, G.A.; Frazier, G.F.

    1999-07-01

    The Sunflower Army Ammunition Plant covers 44 km{sup 2} and is located near several large population centers. Leased sites within the plant are now being used for various activities including recreation and manufacturing. Plans are in place for conversion of an additional 3,000 ha to a commercial amusement park. Some 400 structures from the plant remain and most must be removed if further ventures are to take place. Many of the buildings are structurally unsound or contain potentially hazardous materials, such as explosive residues, lead sheathing or asbestos shingles, that were stored or used in the construction of the structures.more » State and federal agencies agreed that the buildings should be destroyed, but the method to do so was unclear. Analysis on building by building basis revealed that in many cases explosive residue made it unsafe to remove the buildings by any other method rather than combustion. Completion of a comprehensive destruction plan that included ground-level monitoring of combustion plumes, and burn scheduling under tightly prescribed micro and mesoscale meteorological conditions was approved by the EPA as a non-time critical removal action under CERCLA in 1996; the US Army was designated as the lead agency. Personnel at the University of Kansas assisted in developing the destruction plan and helped conduct two test burns using the comprehensive plan protocols. Results of one test burn scenario on June 26, 1997, intended as a test of probable dispersion safety margin and covered extensively by print and television media, the EPA and State agencies, are described in this paper. The selected building was smaller than typical of the buildings on the plant site. The events leading to a burn decision on the test day are used to illustrate the decision-making process.« less

  9. The Nexus Between Ecological Risk Assessment and Natural Resources Damage Assessment Under CERCLA: Introduction to a Society of Environmental Toxicology and Chemistry Techincal Workshop

    EPA Science Inventory

    A SETAC Technical Workshop titled “The Nexus Between Ecological Risk Assessment and Natural Resource Damage Assessment Under CERCLA: Understanding and Improving the Common Scientific Underpinnings,” was held 18–22 August 2008 in Gregson, Montana, USA, to examine the linkage, nexu...

  10. 40 CFR 355.33 - What release quantities of EHSs and CERCLA hazardous substances trigger the emergency release...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false What release quantities of EHSs and..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS EMERGENCY PLANNING AND NOTIFICATION Emergency Release Notification Who Must Comply § 355.33 What release quantities of EHSs and CERCLA hazardous...

  11. 43 CFR 11.15 - What damages may a trustee recover?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 11.15 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... section 107(f) or 126(d) of CERCLA, or sections 311(f) (4) and (5) of the CWA, a natural resource trustee..., for the same discharge or release and natural resource, as set forth in section 107(f)(1) of CERCLA...

  12. 43 CFR 11.15 - What damages may a trustee recover?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 11.15 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE... section 107(f) or 126(d) of CERCLA, or sections 311(f) (4) and (5) of the CWA, a natural resource trustee..., for the same discharge or release and natural resource, as set forth in section 107(f)(1) of CERCLA...

  13. 77 FR 66462 - Proposed CERCLA Settlement Relating to the Digital Equipment Corp. Site a/k/a the PCB Horizon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9748-6] Proposed CERCLA Settlement Relating to the Digital Equipment Corp. Site a/k/a the PCB Horizon Site in San German, PR AGENCY: Environmental Protection Agency... Digital Equipment Corp. Superfund Site, a/k/a the PCB Horizon Site (``Site''), located in San German...

  14. 76 FR 72216 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation and Liability Act (``CERCLA'') Consistent with Section 122(d)(2) of CERCLA, 42 U.S.C. 9622(d)(2), notice is hereby given that on November 7, 2011, a proposed Consent Decree in The General...

  15. 76 FR 45174 - State Official Notification Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... granted in section 1042(a) to enforce the Act or regulations prescribed thereunder. This interim final... actions or proceedings undertaken under section 1042(a) of the Act, 12 U.S.C. 5552(a), to enforce the Act... than 10 days prior to initiating an action to enforce the Act or any regulation prescribed thereunder...

  16. "Winsight"™ Assessment System: Preliminary Theory of Action. Research Report. ETS RR-17-26

    ERIC Educational Resources Information Center

    Wylie, E. Caroline

    2017-01-01

    The "Winsight"™Assessment System integrates summative, interim (including both benchmark assessments and testlets), and formative assessment components initially focused on mathematics and English language arts (ELA) in Grades 3-8 and high school.This report provides a preliminary theory of action for the Winsight Assessment System. A…

  17. Superfund record of decision (EPA Region 7): Cornhusker Army Ammunition Plant, Operable Unit 1, Hall County, Grand Island, NE, September 29, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    The decision document presents the selected interim remedial action for the groundwater operable unit at the Cornhusker Army Ammunition Plant (CAAP). Operable Unit One encompasses the explosives groundwater plume(s), both on-post and off-post. Explosives of concern in the contaminant plume include RDX, TNT, HMX, and their decomposition products. The objective of the interim action is to contain the plume and prevent further migration of contaminants, and does not encompass full restoration of the plume of contaminated groundwater. The recommended alternatives provide an approach to containing and removing contaminant mass from the groundwater plume. This approach will control further migration ofmore » the plume and reduce the levels of the contamination in groundwater.« less

  18. 78 FR 63978 - Proposed CERCLA Settlements Relating to the Truckers Warehouse Site in Passaic, Passaic County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... thus are potentially liable for response costs incurred at or in connection with the Truckers Warehouse... Costs (``Agreements'') pursuant to Section 122(h)(1) of CERCLA, with (1) RJS Corp.; (2) Your Factory... Parties agree to pay a total of $108,748.20 to EPA for past response costs. EPA will consider all comments...

  19. 77 FR 42310 - Proposed CERCLA Administrative Cost Recovery Settlement; City of Middletown, CT and RLO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... City of Middletown, Connecticut to pay $2,800,000 to the Hazardous Substance Superfund in five equal... Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. Section 9622(i), notice is hereby given of...: (1) the City of Middletown, Connecticut to pay $2,800,000 to the Hazardous Substance Superfund in...

  20. 75 FR 51267 - Proposed Cercla Administrative Order On Consent for the Kerber Creek Site, Saguache County, CO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... sections 104, 106, 107, and 122 of CERCLA, 42 U.S.C. 9604, 9606, 9607, and 9622, between EPA and Trout Unlimited, Inc. (``Trout Unlimited'') regarding the Kerber Creek Site located in the Rio Grande Basin near..., and extending to the town of Villa Grove. This AOC requires that Trout Unlimited perform the following...

  1. QA/QC requirements for physical properties sampling and analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Innis, B.E.

    1993-07-21

    This report presents results of an assessment of the available information concerning US Environmental Protection Agency (EPA) quality assurance/quality control (QA/QC) requirements and guidance applicable to sampling, handling, and analyzing physical parameter samples at Comprehensive Environmental Restoration, Compensation, and Liability Act (CERCLA) investigation sites. Geotechnical testing laboratories measure the following physical properties of soil and sediment samples collected during CERCLA remedial investigations (RI) at the Hanford Site: moisture content, grain size by sieve, grain size by hydrometer, specific gravity, bulk density/porosity, saturated hydraulic conductivity, moisture retention, unsaturated hydraulic conductivity, and permeability of rocks by flowing air. Geotechnical testing laboratories alsomore » measure the following chemical parameters of soil and sediment samples collected during Hanford Site CERCLA RI: calcium carbonate and saturated column leach testing. Physical parameter data are used for (1) characterization of vadose and saturated zone geology and hydrogeology, (2) selection of monitoring well screen sizes, (3) to support modeling and analysis of the vadose and saturated zones, and (4) for engineering design. The objectives of this report are to determine the QA/QC levels accepted in the EPA Region 10 for the sampling, handling, and analysis of soil samples for physical parameters during CERCLA RI.« less

  2. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  3. Installation Restoration Program (IRP) Stage 7, Remedial Investigation/ Feasibility Study Comprehensive CERCLA Work PLan for McClellan AFB/EM, McClellan AFB, California

    DTIC Science & Technology

    1991-07-01

    Systems Audits ; Preventive Maintenance; Data Assessment Procedures; Corrective Action; Quality Assurance Reports; and Site Management. General Data Quality...for verification and quality control audits . A copy of the QAPP will be in the possession of field sampling teams for all sampling efforts...L cc- acca C wi w-C P-3-- C I- usu 2; - at C4~~2 Q (( c ccc c-c C- 0L U -C 3- au S - - C3 . - acu tr - -a CL.43 C LU -C2 -C ul 0it S w- -C u Ocw - z i

  4. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  5. Problems and limitations of voluntary cleanup programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, S.F.

    1995-12-31

    At least a dozen states have already implemented voluntary cleanup programs (VCPs). Provisions to promote state VCPs were prominent in the EPA`s 1994 proposed revisions to CERCLA and in current legislative initiatives. Under the VCP, property owners voluntarily enroll to investigate and remediate contaminated sites with the aegis of a state agency and thus avoid involvement with the federal Superfund program. When the state agency is satisfied with the condition of the site, it issues a certificate to the owner. The VCP is meant to mitigate unintended consequences of CERCLA such as the economic abandonment of urban industrial sites inmore » favor of unpolluted suburban sites. The VCP concept has been combined with other reforms including cleanup standards, financial incentives, and independent action. The effectiveness of voluntary cleanup programs is limited by the costs of investigation and cleanup relative to the value of the property in question. It is also limited when property has environmental problems outside the traditional focus of state Superfund agencies on soil and groundwater contamination. VCPs also have potential unintended consequences of their own. The VCP concept is consistent with a 15 year trend of increasing government attention and involvement with sites of diminishing health and environmental significance. VCP may reinforce the perception of liability and unwittingly raise the standard of due diligence in property assessments, especially if combined with generic cleanup standard.« less

  6. There Is an Alternative: A Report on an Action Research Project to Develop a Framework for Co-Operative Higher Education

    ERIC Educational Resources Information Center

    Neary, Mike; Winn, Joss

    2017-01-01

    This report provides an interim account of a participatory action research project undertaken during 2015-16. The research brought together scholars, students and expert members of the co-operative movement to design a theoretically informed and practically grounded framework for co-operative higher education that activists, educators and the…

  7. Validation of Passive Sampling Devices for Monitoring of Munitions Constituents in Underwater Environments

    DTIC Science & Technology

    2017-09-01

    Compensation, and Liability Act (CERCLA) and U.S. Environmental Policy Act (USEPA) requirements to protect both human health /safety and...former VNTR is based on potential risks to human health and the environment identified via the CERCLA process, together with applicable or relevant and...evaluation. National Oceanic and Atmospheric Administration Data. Isla de Vieques. U.S. Department of Health and Human Services, Agency for Toxic

  8. RCRA, Superfund and EPCRA hotline training module. Introduction to: Statutory overview of the Comprehensive Environmental Response, Compensation, and Liability Act (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    This module presents a brief overview of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the statute through which Congress established EPA`s hazardous substance release reporting and cleanup program, known as the Superfund program. This module presents information of the CERCLA statute only, not the regulations promulgated pursuant to the statute.

  9. Superfund Record of Decision (EPA Region 4): USMC Camp Lejeune Military Reservation, NC. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-23

    The 500-acre Camp Lejeune Military Reservation is located 15 miles southeast of Jacksonville, in Onslow County, North Carolina. Within the site lies the Hadnot Point Industrial Area (HPIA), which was constructed in the late 1930's. It is composed of 75 buildings and facilities, which include gas stations, offices, storage yards, maintenance shops, and a dry cleaning plant. Several areas of the HPIA have been investigated for potential contamination attributed to Marine Corps activities and operations that resulted in a generation of potentially hazardous wastes. The ROD addresses an interim remedial action for the shallow aquifer at the HPIA to protectmore » human health from exposure to VOCs and metals. The primary contaminants of concern affecting the shallow ground water aquifer are VOCs, including benzene and TCE; and metals, including arsenic, chromium, and lead.« less

  10. Installation Restoration Program. Phase 1 - Records Search, Robins AFB, Georgia.

    DTIC Science & Technology

    1982-04-01

    Installations U under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980. PURPOSE AND SCOPE OF THE... Liability Act of 1980 (CERCLA). A potentially hazardous waste is one which is suspected of being hazardous although insufficient data are available to...comprised of a concrete vault buried approximately six feet below the ground surface. 4 A locked chain -linked fence with two barbed wire strands surrounds

  11. Cleanup liability and the Constitution

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Friedland, D.M.; Hagen, P.E.

    It was observed in the July 1992 issue of this Journal that a plain reading of the Constitution's prohibition on [open quotes][ital ex post facto][close quotes] suggests that some environmental statutes such as the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA or Superfund) and the Resource Conservation and Recovery Act of 1976 (RCRA) conflict with Constitutional principles. Like many Constitutional principles, however, the Supreme Court's interpretation of the Constitution's bar on [ital ex post facto] laws has a long history. The Court has consistently interpreted this clause as limited to criminal or penal statutes. This article discussesmore » the history of the [ital ex post facto] clause, the retroactive application of CERCLA and RCRA, the decision that retroactive application of CERCLA and RCRA does not violate the [ital ex post facto] clause, and laws, regulations, and guidance. 27 refs.« less

  12. Superfund record of decision (EPA Region 3): US Defense General Supply Center, Operable Unit 9, Chesterfield County, VA, September 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The decision document presents the selected interim remedial action for Operable Unit 9 (OU9) at the Defense General Supply Center (DGSC) in Chesterfield County, Virginia near Richmond. OU9 pertains to groundwater beneath Area 50, the Open Storage Area (OSA), and the Naitonal Guard Area (NGA). This operable unit is the third of nine operable units that are currently being addressed at the DGSC. OU9 addresses interim treatment and containment of groundwater in the upper and lower aquifers beneath Area 50, the OSA, and the NGA.

  13. A Comprehensive Evaluation of the Community Action Program in Austin and Travis County, Texas. Final Report.

    ERIC Educational Resources Information Center

    Tracor, Inc., Austin, TX.

    Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…

  14. Federal enforcement in group and individual health insurance markets. Final rule.

    PubMed

    2005-11-25

    This rule makes final an interim final rule that details procedures we use for enforcing title XXVII of the Public Health Service Act as added by the Health Insurance Portability and Accountability Act of 1996, and as amended by the Mental Health Parity Act of 1996, the Newborns' and Mothers' Health Protection Act of 1996, and the Women's Health and Cancer Rights Act of 1998. Specifically, we are responsible for enforcing title XXVII requirements in States that do not enact the legislation necessary to enforce those requirements, or otherwise fail to substantially enforce the requirements. We are also responsible for taking enforcement actions against non-Federal governmental plans. The regulation describes the process we use in both enforcement contexts. This final rule deletes an appendix to the interim rule that listed examples of violations of title XXVII and corrects the description of a cross-reference, but makes no substantive changes to the interim final rule.

  15. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less

  16. Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs, Raymer J.E.

    2008-06-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).« less

  17. The Pueblo Superfund program -- a Native American perspective on cultural impacts and environmental equity under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanchez, C.M.; Garcia, T.L.; Chavez, E.F.

    1996-12-31

    The All Indian Pueblo Council (AIPC) through the Pueblo Office of Environmental Protection (POEP) implements and provides a variety of environmental programs and services to the 19 Indian Pueblos of New Mexico. Specifically, the POEP Superfund Program investigates and evaluates potential hazardous waste sites within Pueblo lands. The POEP Superfund Program began in September 1991 when the 19 Pueblo Governors signed a Superfund Memorandum of Agreement with the US Environmental Protection Agency (EPA) Region 6. The goal of the POEP Superfund Program is to determine those sites that are eligible for Superfund-financed remedial action by placing those sites on themore » National Priorities List (NPL), while including the Pueblo perspective. Because the 19 Pueblos are each unique, sovereign nations, several differences and gaps associated with the current Superfund law and EPA methodologies exist. Currently, the Superfund Hazard Ranking System (HRS) model does not account for Indian religious and ceremonial impacts from these sites. Due to their importance in Pueblo life, culturally significant plants, animals, ceremonial surface water use, and sacred areas should be considered as critical impacts when evaluating the various pathways of exposure of the HRS. Tribal environmental equality is an aspect that will be included into all environmental laws. AIPC and POEP are working to address this issue under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA).« less

  18. Environmental Aspects of Two Volatile Organic Compound Groundwater Treatment Designs at the Rocky Flats Site - 13135

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michalski, Casey C.; DiSalvo, Rick; Boylan, John

    2013-07-01

    DOE's Rocky Flats Site in Colorado is a former nuclear weapons production facility that began operations in the early 1950's. Because of releases of hazardous substances to the environment, the federally owned property and adjacent offsite areas were placed on the CERCLA National Priorities List in 1989. The final remedy was selected in 2006. Engineered components of the remedy include four groundwater treatment systems that were installed before closure as CERCLA-accelerated actions. Two of the systems, the Mound Site Plume Treatment System and the East Trenches Plume Treatment System, remove low levels of volatile organic compounds using zero-valent iron media,more » thereby reducing the loading of volatile organic compounds in surface water resulting from the groundwater pathway. However, the zero-valent iron treatment does not reliably reduce all volatile organic compounds to consistently meet water quality goals. While adding additional zero-valent iron media capacity could improve volatile organic compound removal capability, installation of a solar powered air-stripper has proven an effective treatment optimization in further reducing volatile organic compound concentrations. A comparison of the air stripper to the alternative of adding additional zero-valent iron capacity to improve Mound Site Plume Treatment System and East Trenches Plume Treatment System treatment based on several key sustainable remediation aspects indicates the air stripper is also more 'environmentally friendly'. These key aspects include air pollutant emissions, water quality, waste management, transportation, and costs. (authors)« less

  19. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  20. 10 CFR 712.19 - Removal from HRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...

  1. Final Environmental Assessment for the CV-22 Interim Beddown

    DTIC Science & Technology

    2016-04-01

    as asbestos -containing materials and lead-based paints, depending on the age of the buildings demolished. The Proposed Action and proposed...Demolition could generate additional hazardous wastes and materials such as asbestos -containing materials and lead-based paints, depending on the

  2. 75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111

  3. 76 FR 40777 - Interim Enforcement Policy for Certain Fire Protection Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Certain Fire Protection Issues AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... Enforcement Policy on enforcement discretion for certain fire protection issues to extend the enforcement... policy affects licensees that are transitioning to use the National Fire Protection Association Standard...

  4. Health assessments and other activities of the Agency for Toxic Substances and Disease Registry (ATSDR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this memorandum is provide Department of Energy (DOE) Field Organizations having line management responsibilities for the conduct of environmental restoration activities with information of ATSDR responsibilities and activities at Departmental facilities subject to response actions under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), or corrective actions under the Resource Conservation and Recovery Act (RCRA). ATSDR's duties include: (1) establishing registries of disease and exposure at sites having releases of hazardous substances; (2) when necessary, providing medical care and testing of exposed persons; (3) developing toxicologicalmore » profiles on hazardous substances: (4) maintaining lists of areas closed to public; (5) researching the relationship between exposure to toxic substances and illness: (6) conducting health assessments; (7) responding to petition to conduct a health assessment (anyone may petition ATSDR to perform a health assessment); (8) developing educational materials regarding toxic substances for use by health professionals.« less

  5. Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, David M.; Edge, Helen

    2013-07-01

    The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determinationmore » from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)« less

  6. 75 FR 9114 - Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to Multiyear Contracts (DFARS Case 2008-D023) AGENCY: Defense Acquisition Regulations System. Department of Defense (DoD). ACTION: Interim rule...

  7. 75 FR 39414 - Federal Acquisition Regulation; FAR Case 2008-039, Reporting Executive Compensation and First...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... National Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments... free, public, online Web site containing full disclosure of all Federal contract award information, the...

  8. 76 FR 81789 - Consumer Leasing (Regulation M); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1013 [Docket No. CFPB-2011-0026] RIN 3170-AA06 Consumer Leasing (Regulation M); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION...). The interim final rule established a new Regulation M (Consumer Leasing) in accordance with the...

  9. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  10. 77 FR 25630 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    .... 120316196-2195-01] RIN 0648-BB89 Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Interim Action; Withdrawn AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA...

  11. 75 FR 80335 - Federal Government Participation in the Automated Clearing House

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Participation in the Automated Clearing House AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Interim final rule. SUMMARY: The Department of the Treasury, Financial Management Service (FMS... include the agency name (``Financial Management Service'') and docket number FISCAL-FMS-2010- 0003 for...

  12. 75 FR 13680 - Commutation of Sentence: Technical Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Sentence: Technical Change AGENCY: Bureau of Prisons, Justice. ACTION: Interim rule. SUMMARY: This document makes a minor technical change to the Bureau of Prisons (Bureau) regulations on sentence commutation to.... Commutation of Sentence: Technical Change This document makes a minor technical change to the Bureau...

  13. 76 FR 70639 - Agricultural Career and Employment Grants Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...

  14. 77 FR 66578 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of Interim Provider; Opportunity for Designation in the Indianapolis, IN Area; Correction AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA. ACTION: Notice; correction. SUMMARY: The USDA, Grain Inspection, Packers and...

  15. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  16. 78 FR 79567 - Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...

  17. 75 FR 80678 - Conversions of Insured Credit Unions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... Conversions of Insured Credit Unions AGENCY: National Credit Union Administration (NCUA). ACTION: Interim... of the phrase ``Regional Director'' in NCUA's rule on credit union to mutual savings bank conversions and to add the same revised definition of that phrase to NCUA's rule on conversions to nonfederal...

  18. 77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...

  19. 77 FR 40459 - Electronic Fund Transfers (Regulation E); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Electronic Fund Transfers (Regulation E); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION... published the Final Rule (77 FR 6194), which implements the Electronic Fund Transfer Act, and the official... Sec. 1005.3(a) in the interim final rule, Electronic Fund Transfers (Regulation E), published on...

  20. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, TN. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 22,436-acre Milan Army Ammunition Plant (MAAP) is located in western Tennessee, 5 miles east of Milan, Tennessee. The facility was constructed in 1941 to produce and store fuses, boosters, and small- and large-caliber ammunition. The ROD addresses an interim remedy for the contaminated ground water beneath and immediately downgradient from the former ponds as OU1. The primary contaminants of concern affecting the ground water are VOCs, including carbon disulfide; other organics, including HMX, RDX, 2,4,6-TNT, 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-trinitrobenzene, and nitrobenzene; and inorganics, including nitrate.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartman, Mary J.; Peterson, Robert E.

    This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies.

  2. 78 FR 56837 - 2012 Liquid Chemical Categorization Updates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 46 CFR Parts 30, 150, and 153 [Docket No. USCG-2013-0423] RIN 1625-AB94 2012 Liquid Chemical Categorization Updates AGENCY: Coast Guard, DHS. ACTION: Interim rule; delay of effective date. SUMMARY: The Coast Guard is delaying the effective date of this...

  3. 77 FR 19525 - National School Lunch Program: School Food Service Account Revenue Amendments Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...

  4. 75 FR 17145 - Food Additives; Bisphenol A; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... five documents related to FDA's continuing assessment of Bisphenol A (BPA) and soliciting public...). These documents do not represent an agency opinion or position on BPA, on which an interim update was... assessment of BPA. This action will enable FDA to consider comments from the public in its assessment of BPA...

  5. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  6. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES.

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  7. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  8. 75 FR 81087 - Plum Pox Virus; Update of Quarantined Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    .... APHIS-2010-0089] Plum Pox Virus; Update of Quarantined Areas AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule and request for comments. SUMMARY: We are amending the plum pox virus.... SUPPLEMENTARY INFORMATION: Background The plum pox virus (PPV) is an extremely serious viral disease of plants...

  9. 77 FR 64564 - Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...-Basis Hurricane and Hurricane Missiles AGENCY: Nuclear Regulatory Commission. ACTION: Proposed interim...-ISG-024, ``Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles....221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants.'' DATES: Submit...

  10. 76 FR 21615 - Nectarines and Peaches Grown in California; Suspension of Handling Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... requirements. The orders also authorize production research and marketing research and development projects, as... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 916 and 917 [Doc. No. AMS-FV... Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments...

  11. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  12. 75 FR 48873 - Acquisition Regulation Rewrite

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Acquisition Regulation (DIAR). This action revises the DIAR, 48 CFR chapter 14, but does not impose any new..., 2010. No public comments were received. DOI has concluded that the interim rule should be adopted as a... DEPARTMENT OF THE INTERIOR Office of the Secretary 48 CFR Chapter 14 RIN 1093-AA11 Acquisition...

  13. 76 FR 53813 - Dried Prunes Produced in California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 993 [Doc. No. AMS-FV-11-0068... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the assessment rate established for the Prune Marketing Committee (Committee) for the 2011-12 and subsequent crop...

  14. 76 FR 30184 - Outer Continental Shelf (OCS) Renewable Energy Program Interim Policy Leasing for Marine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...

  15. 77 FR 72683 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... marketing order now in effect, Washington sweet cherry handlers are subject to assessments. Funds to... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  16. 76 FR 16531 - Country of Origin of Textile and Apparel Products; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... RIN 1505-AB60) Country of Origin of Textile and Apparel Products; Correction AGENCIES: U.S. Customs and Border Protection, Department of Homeland Security; Department of the Treasury. ACTION: Final rule..., a document which adopted as a final rule, with some changes, interim amendments to the CBP...

  17. 76 FR 67376 - Anglers for Christ Ministries, Inc., New Beginning Ministries; Petitioners; Interpretation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 79 [CG Docket No. 06-181; FCC 11-159] Anglers for... Standard AGENCY: Federal Communications Commission. ACTION: Interim rule. SUMMARY: In this document, the... intended by the Communications Act (Act). DATES: Effective November 1, 2011. FOR FURTHER INFORMATION...

  18. 75 FR 39632 - Regulated Navigation Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ..., Algiers Canal, New Orleans, LA; Correction ACTION: Interim rule; Correction. SUMMARY: In the Federal... Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey Canal, Algiers Canal, New Orleans, LA into the Code of Federal Regulations. That publication contained an error in the DATES section...

  19. 78 FR 21520 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... decreased the assessment rate established for the Washington Cherry Marketing Committee (Committee) for the...

  20. 78 FR 21518 - Apricots Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-12-0027...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The... the assessment rate established for the Washington Apricot Marketing Committee (Committee) for the...

  1. 78 FR 24333 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... York, hereinafter referred to as the ``order.'' The order is effective under the Agricultural Marketing... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as...

  2. 77 FR 39150 - Avocados Grown in South Florida; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any questions about the compliance guide... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 915 [Doc. No. AMS-FV-11-0094... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the...

  3. 75 FR 65439 - Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case... System AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule... Supplement (DFARS) to conform to the Federal Acquisition Regulation (FAR) by providing Department of Defense...

  4. 76 FR 33184 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... multiple OPs from 2001-2005. Furthermore, the USDA Food Safety and Inspection Service (FSIS) monitors meat... Food, Drug, and Cosmetic Act (FFDCA). DATES: Comments, identified by docket identification (ID) number...? You may be potentially affected by this action if you are an agricultural producer, food manufacturer...

  5. 77 FR 52595 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule revises the reporting requirements currently prescribed under the marketing...

  6. 75 FR 39859 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...

  7. 76 FR 47476 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...

  8. 77 FR 33662 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...

  9. 76 FR 74831 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... exposed to treated borated water. In response to a request from the Nuclear Energy Institute (NEI), the... NUCLEAR REGULATORY COMMISSION [NRC-2011-0256] Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff...

  10. 78 FR 68101 - Environmental Issues Associated With New Reactors and Specific Environmental Guidance for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... October 15, 2013. The Nuclear Energy Institute (NEI) submitted a letter on September 17, 2013 (Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With... AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; re-opening of comment period...

  11. 76 FR 69146 - Agricultural Career and Employment Grants Program; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ..., Departmental Management, USDA. ACTION: Proposed rule; withdrawal. SUMMARY: On October 27, 2011, USDA submitted... Regulations section of this issue of the Federal Register, USDA is publishing the interim rule. DATES: As of..., Voice: (202) 205-4215, Fax: (202) 720-7136, Email: [email protected]usda.gov . SUPPLEMENTARY...

  12. 78 FR 62963 - Apricots Grown in Designated Counties in Washington; Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-13-0040... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY... under the Washington apricot marketing order (order) for the remainder of the 2013-2014 fiscal period...

  13. 75 FR 75884 - Regulations Regarding Income-Related Monthly Adjustment Amounts to Medicare Beneficiaries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... premiums. This new subpart implements changes made to the Social Security Act (Act) by the Affordable Care... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 418 [Docket No. SSA-2010-0029] RIN 0960-AH22... Coverage Premiums AGENCY: Social Security Administration. ACTION: Interim final rule with request for...

  14. 76 FR 80733 - Extension of Temporary Registration of Municipal Advisors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-66020; File No. S7-19-10] RIN 3235-AK69 Extension of Temporary Registration of Municipal Advisors AGENCY: Securities and Exchange Commission. ACTION: Interim final temporary rule; extension. SUMMARY: The Securities and Exchange Commission...

  15. 76 FR 56949 - Biomass Crop Assistance Program; Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    .... ACTION: Interim rule; correction. SUMMARY: The Commodity Credit Corporation (CCC) is amending the Biomass... funds in favor of the ``project area'' portion of BCAP. CCC is also correcting errors in the regulation... INFORMATION: Background CCC published a final rule on October 27, 2010 (75 FR 66202-66243) implementing BCAP...

  16. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  17. THE INTEGRATION OF THE 241-Z BUILDING DECONTAMINATION & DECOMMISSIONING (D&D) UNDER COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION & LIABILITY ACT (CERCLA) WITH RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE AT THE PLUTONIUM FINISHING PLANT (PFP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2007-02-20

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building.more » The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.« less

  18. DOUBLE TRACKS Test Site interim corrective action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less

  19. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  20. Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.

    PubMed

    1983-03-07

    The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.

  1. 77 FR 24381 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule; reopening of comment period. SUMMARY: The Coast...

  2. 77 FR 2019 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule with request for comments. SUMMARY: The Coast...

  3. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  4. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  5. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  6. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  7. 75 FR 29183 - Office of the Chief Financial Officer; Department of Agriculture Implementation of OMB Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... participants in lower-tier covered transactions with whom I intend to do business? Subpart D--Responsibilities... exclusions from covered transactions and codifies a statutory permanent debarment provision. This action also... transactions. Finally, this interim rule implements Section 14211 of the Food, Conservation, and Energy Act of...

  8. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  9. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  10. 77 FR 2446 - Amendments to Regulations Regarding Eligibility for a Medicare Prescription Drug Subsidy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Administration. ACTION: Final rule. SUMMARY: This final rule adopts, without change, the interim final rule with... incorporated changes to the Medicare prescription drug coverage low-income subsidy (Extra Help) program made by..., 2011. We also revised our regulations to incorporate changes made by the Medicare Improvements for...

  11. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality Management District AGENCY... on a proposed approval of a revision to the Sacramento Metropolitan Air Quality Management District... therefore is not subject to review by the Office of Management and Budget. This action is not subject to...

  12. 77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...

  13. Superfund explanation of significant difference for the record of decision (EPA Region 9): San Fernando Valley, Burbank Operable Unit, Los Angeles County, CA, November 21, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    The decision document presents this Explanation of Significant Differences (ESD) to the interim remedial action selected in the San Fernando Valley, Burbank Operable Unit Record of Decision (ROD) signed June 1989 (PB90-114844).

  14. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  15. 76 FR 27848 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Adoption of interim rule as final. SUMMARY: The Department of... marketing order for Oregon-Washington pears that provides for the sale of fresh pears directly to consumers...

  16. 76 FR 4202 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule adds an exemption to the marketing order for Oregon- Washington pears that provides for the sale of fresh...

  17. 76 FR 78150 - Procedures for the Handling of Retaliation Complaints Under Section 806 of the Sarbanes-Oxley Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... of the Sarbanes-Oxley Act of 2002, as Amended; Correction AGENCY: Occupational Safety and Health Administration, Labor. ACTION: Interim final rule; correction. SUMMARY: The Occupational Safety and Health... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1980 [Docket Number...

  18. From the Bottom Up: Toward a Strategy for Income and Employment Generation among the Disadvantaged. An Interim Report.

    ERIC Educational Resources Information Center

    O'Regan, Fred; Conway, Maureen

    The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…

  19. 76 FR 60707 - Supplemental Standards for Ethical Conduct for Employees of the Department of the Treasury

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF THE TREASURY Office of Financial Research 12 CFR Chapter XVI RIN 1505-AC38... Financial Research, Treasury. ACTION: Interim rule. SUMMARY: The Department of the Treasury (Department... chapter in Title 12 of the Code of Federal Regulations to incorporate certain post-employment prohibitions...

  20. 76 FR 67361 - Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...

  1. 78 FR 24669 - Reorganization of Regulations on the Adjudication of Department of Homeland Security Practitioner...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF JUSTICE Executive Office for Immigration Review 8 CFR Parts 1003 and 1292 [EOIR... Immigration Review, Department of Justice. ACTION: Final rule. SUMMARY: This final rule adopts without change... interim rule amended regulations of the Executive Office for Immigration Review (EOIR) at the Department...

  2. 78 FR 21521 - Pears Grown in Oregon and Washington; Assessment Rate Decrease for Processed Pears

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-12-0031... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... Committee locally administers the marketing order that regulates the handling of processed pears grown in...

  3. Improving Student Achievement in a Multidisciplinary Context

    ERIC Educational Resources Information Center

    Chapman, Amanda; Bloxham, Sue

    2004-01-01

    This article analyses interim findings of an ongoing action research project into the use of assessment criteria and grade descriptors in the assessment process. The project is multidisciplinary and covers areas as diverse as Sports Sociology, Economics, Youth and Community Studies, and Education. The idea is to equip first-year students with the…

  4. 78 FR 56816 - Vidalia Onions Grown in Georgia; Change in Reporting and Assessment Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... the following Web site: http://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 955 [Doc. No. AMS-FV-12-0071...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The...

  5. 78 FR 24983 - Domestic Dates Produced or Packed in Riverside County, California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ...://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting Jeffrey Smutny, Marketing Order... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 987 [Docket No. AMS-FV-12-0035... Rate AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule...

  6. The Costs and Benefits of High Speed Vessels Relative to Traditional C-17 Military Airlift

    DTIC Science & Technology

    2003-12-01

    37 APPENDIX D SWOT Analysis...Port Action Officers Group IBCT Interim Brigade Combat Team LCS Littoral Combat Ship LST Landing ship tank LSV Logistics Support Vessel... SWOT Strength Weakness Opportunity Threat TACOM Tank and Automotive Command TSV Theater Support Vessel USS United States Ship USTRANSCOM

  7. 77 FR 20536 - Exemptions for Security-Based Swaps Issued by Certain Clearing Agencies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... Markets Trends, Division of Corporation Finance, at (202) 551-3860, U.S. Securities and Exchange... exchange trading due to individual business needs of certain users. Those users should retain the ability... Corporation Finance issued a no-action letter that addressed the availability of these interim exemptions to...

  8. 76 FR 68116 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...

  9. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...

  10. 76 FR 446 - Supplemental Security Income (SSI) for the Aged, Blind, and Disabled; Dedicated Accounts and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2008-0050] RIN 0960-AE59... Payments for Certain Past- Due SSI Benefits AGENCY: Social Security Administration (SSA). ACTION: Final rules. SUMMARY: These final rules adopt, with some minor changes, the interim final rules with request...

  11. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  12. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  14. Superfund Record of Decision (EPA Region 1): Otis Air National Guard/Camp Edwards, MA. (First remedial action), May 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-20

    The 22,000-acre Otis National Guard/Camp Edwards site is a former military vehicle maintenance facility on Cape Cod, Massachusetts, within the Massachusetts Military Reservation (MMR). The Area of Contamination Chemical Spill Area Number 4 (AOC CS-4) plume extends 11,000 feet and is located 1.1 miles from the southern boundary of MMR. Wastes and equipment handled at AOC CS-4 included oils, solvents, antifreeze, battery electrolytes, paint, and waste fuels. Additionally, the northern portion of AOC CS-4 was used as a storage yard for wastes generated by shops and laboratories operating at MMR. Liquid wastes were stored in containers or underground storage tanksmore » (USTs) in an unbermed area or deposited in USTs designated for motor gasoline. The ROD addresses OU2, the interim action for MMR AOC CS-4 ground water to prevent further down gradient migration of the contaminants. The primary contaminants of concern affecting the ground water are VOCs, including PCE and TCE.« less

  15. Energy policy act transportation study: Interim report on natural gas flows and rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less

  16. CERCLA-linked environmental impact and benefit analysis: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    PubMed

    McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A

    2018-01-01

    This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives, and should be applied to complex remediation projects to aid environmental decision making. Integr Environ Assess Manag 2018;14:22-31. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  17. Integrating intrusive and nonintrusive characterization methods to achieve a conceptual site model for the SLDA FUSRAP site - 8265.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, L. A.; Peterson, J. M.; Frothingham, D. G.

    2008-01-01

    The US Army Corps of Engineers (USACE) is addressing radiological contamination following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements at the Shallow Land Disposal Area (SLDA) site, which is a radiologically contaminated property that is part of the Formerly utilized Sites Remedial Action Program (FUSRAP). The SLDA is an 18-hectare (44-acre) site in Parks township, Armstrong County, Pennsylvania, about 37 kilometers (23 miles) east-northeast of Pittsburgh. According to historical record, radioactive wastes were disposed of at the SLDA in a series of trenches by the Nuclear Materials and Equipment Company (NUMEC) in the 1960s. The wastes originated frommore » the nearby Apollo nuclear fuel fabrication facility, which began operations under NUMEC in the late 1950s and fabricated enriched uranium into naval reactor fuel elements. It is believed that the waste materials were buried in a series of pits constructed adjacent to one another in accordance with an Atomic Energy Commission (AEC) regulation that has since been rescinded. A CERCLA remedial investigation/feasibility study (RI/FS) process was completed for the SLDA site, and the results of the human health risk assessment indicated that the radiologically contaminated wastes could pose a risk to human health in the future. There are no historical records that provide the exact location of these pits. However, based on geophysical survey results conducted in the 1980s, these pits were defined by geophysical anomalies and were depicted on historical site drawings as trenches. At the SLDA site, a combination of investigative methods and tools was used in the RI/FS and site characterization activities. The SLDA site provides an excellent example of how historical documents and data, historical aerial photo analysis, physical sampling, and nonintrusive geophysical and gamma walkover surveys were used in combination to reduce the uncertainty in the location of the trenches. The data and information from these sources were used to refine the conceptual site model, complete the RI/FS, and support the ongoing remedial design and action, which will achieve site closure acceptable to all stakeholders.« less

  18. Integrating Intrusive and Non-intrusive Characterization Methods To Achieve A Conceptual Site Model For The SLDA FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, L.A.; Peterson, J.M.; Frothingham, D.G.

    2008-07-01

    The U.S. Army Corps of Engineers (USACE) is addressing radiological contamination following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements at the Shallow Land Disposal Area (SLDA) site, which is a radiologically contaminated property that is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The SLDA is an 18-hectare (44- acre) site in Parks Township, Armstrong County, Pennsylvania, about 37 kilometers (23 miles) east-northeast of Pittsburgh. According to historical record, radioactive wastes were disposed of at the SLDA in a series of trenches by the Nuclear Materials and Equipment Company (NUMEC) in the 1960's. The wastes originatedmore » from the nearby Apollo nuclear fuel fabrication facility, which began operations under NUMEC in the late 1950's and fabricated enriched uranium into naval reactor fuel elements. It is believed that the waste materials were buried in a series of pits constructed adjacent to one another in accordance with an Atomic Energy Commission (AEC) regulation that has since been rescinded. A CERCLA remedial investigation/feasibility study (RI/FS) process was completed for the SLDA site, and the results of the human health risk assessment indicated that the radiologically contaminated wastes could pose a risk to human health in the future. There are no historical records that provide the exact location of these pits. However, based on geophysical survey results conducted in the 1980's, these pits were defined by geophysical anomalies and were depicted on historical site drawings as trenches. At the SLDA site, a combination of investigative methods and tools was used in the RI/FS and site characterization activities. The SLDA site provides an excellent example of how historical documents and data, historical aerial photo analysis, physical sampling, and non-intrusive geophysical and gamma walkover surveys were used in combination to reduce the uncertainty in the location of the trenches. The data and information from these sources were used to refine the conceptual site model, complete the RI/FS, and support the ongoing remedial design and action, which will achieve site closure acceptable to all stakeholders. (authors)« less

  19. Integrated Hydrogeological Model of the General Separations Area, Vol. 2, Rev. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FLACH, GREGORYK.

    1999-04-01

    The 15 mi2 General Separations Area (GSA) contains more than 35 RCRA and CERCLA waste units, and is the focus of numerous ongoing and anticipated contaminant migration and remedial alternatives studies. To meet the analysis needs of GSA remediation programs, a groundwater flow model of the area based on the FACT code was developed. The model is consistent with detailed characterization and monitoring data through 1996. Model preprocessing has been automated so that future updates and modifications can be performed quickly and efficiently. Most remedial action scenarios can be explicitly simulated, including vertical recirculation wells, vertical barriers, surface caps, pumpingmore » wells at arbitrary locations, specified drawdown within well casings (instead of flowrate), and wetland impacts of remedial actions. The model has a fine scale vertical mesh and heterogeneous conductivity field, and includes the vadose zone. Therefore, the model is well suited to support subsequent contaminant transport simulations. the model can provide a common framework for analyzing groundwater flow, contaminant migration, and remedial alternatives across Environmental Restoration programs within the GSA.« less

  20. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whelan, G.; Hartz, K.E.; Hilliard, N.D.

    1990-04-01

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluatedmore » and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.« less

  1. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  2. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  3. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Biota and representative concentrations of contaminants. Appendixes A, B, C, D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OU`s). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  4. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, and D-Biota and representative concentrations of contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extentmore » of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 2 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.« less

  5. Response Action Plan for the Basin F Interim Response Action Waste Pile.

    DTIC Science & Technology

    1992-10-01

    the Waste Pile via an 8-Inch diameter HDPE stand pipe. A stainless - steel submersible pump provides the lift to deliver the collected liquid 5 to the...2.1.4 Settlement Measuring System 3 Nine settlement plates were installed at the base of the Waste Pile during its construction. A 1-Inch steel pipe...PLATE STEEL CONDUIT. PIPE GS: 5219.61 GS: 5219.98 GS: 5219.56 GS: 5219.50 SPSP: 5217.87 SPSP: 5217.94 SPSP: 5218.59 THP: 5221.25 THP: 5221.41 THP

  6. 76 FR 21812 - Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (44 U.S.C. chapter 35). List of Subjects in 48 CFR Parts 209 and 252 Government procurement. Mary...-AG78 Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...). ACTION: Final rule. SUMMARY: DoD is adopting as a final rule, without change, an interim rule that...

  7. Cleanup Verification Package for the 600-47 Waste Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Cutlip

    This cleanup verification package documents completion of interim remedial action for the 600-47 waste site. This site consisted of several areas of surface debris and contamination near the banks of the Columbia River across from Johnson Island. Contaminated material identified in field surveys included four areas of soil, wood, nuts, bolts, and other metal debris.

  8. 76 FR 4204 - Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West; Revision of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 985 [Docket Nos. AMS-FV-09-0082; FV10-985-1A IR] Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West...-2011 Marketing Year AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for...

  9. 76 FR 22785 - Direct Certification and Certification of Homeless, Migrant and Runaway Children for Free School...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... 1309 of the Elementary and Secondary Education Act of 1965 (ESEA). In general, a migrant child is one... Children for Free School Meals AGENCY: Food and Nutrition Service, USDA. ACTION: Interim rule with request... children's eligibility for free meals under the National School Lunch Program and the School Breakfast...

  10. 78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...

  11. 76 FR 40038 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... such systems provide timely, reliable information for the management of DoD programs. This interim rule... public impact, their nature may be of public interest and, therefore, are published to provide notice of rulemaking and an opportunity for public participation in the internal DoD rulemaking process. Members of the...

  12. 76 FR 40234 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ...-AA09 Drawbridge Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION... at mile 0.0, across the Harlem River at New York City, New York. This interim rule is necessary to... The 103rd Street (Wards Island) Pedestrian Bridge, across the Harlem River, mile 0.0, at New York City...

  13. Draft Final Risk Assessment Lime Settling Basins. Version 2.1

    DTIC Science & Technology

    1990-10-25

    TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0

  14. 78 FR 3 - Irish Potatoes Grown in Colorado; Modification of the Handling Regulation for Area No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... marketing agreements and orders may be viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 948 [Doc. No. AMS-FV-12-0043... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  15. 76 FR 60358 - Gypsy Moth Generally Infested Areas; Additions in Indiana, Maine, Ohio, Virginia, West Virginia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Virginia, and Wisconsin AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Affirmation of... amended the regulations to add areas in Indiana, Maine, Ohio, Virginia, West Virginia, and Wisconsin to..., West Virginia, and Wisconsin to the list of generally infested areas. \\1\\ To view the interim rule and...

  16. 76 FR 67385 - Claims Procedures Under the Oil Pollution Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-AA03 Claims Procedures Under the Oil Pollution Act of 1990 AGENCY: Coast Guard, DHS. ACTION: Notice of... finalize a 1992 interim rule that set forth the Oil Pollution Act of 1990 (OPA'90) claims procedures and... Pollution Funds Center, U.S. Coast Guard, telephone (202) 493-6863, email [email protected] . If you...

  17. 78 FR 57257 - Medicare Determinations and Income-Related Monthly Adjustment Amounts to Medicare Part B Premiums...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...; Conforming Changes to Regulations AGENCY: Social Security Administration. ACTION: Interim final rule with... monthly adjustment amounts (IRMAA) in order to conform to changes made to the Social Security Act (Act) by... SOCIAL SECURITY ADMINISTRATION 20 CFR Parts 404 and 418 [Docket No. SSA-2012-0011] RIN 0960-AH47...

  18. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  19. Remedial investigation work plan for the Upper East Fork Poplar Creek characterization area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishmentmore » of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers the entire watershed and examines all appropriate media within it. The UEFPC CA, which includes the main Y-12 Plant area, is an operationally and hydrogeologically complex area that contains numerous contaminants and containment sources, as well as ongoing industrial and defense-related activities. The UEFPC CA also is the suspected point of origin for off-site groundwater and surface-water contamination. The UEFPC CA RI also will address a carbon-tetrachloride/chloroform-dominated groundwater plume that extends east of the DOE property line into Union Valley, which appears to be connected with springs in the valley. In addition, surface water in UEFPC to the Lower East Fork Poplar Creek CA boundary will be addressed. Through investigation of the entire watershed as one ``site,`` data gaps and contaminated areas will be identified and prioritized more efficiently than through separate investigations of many discrete units.« less

  20. Interim Reflections on the Corporate University and SME Academy Business Development Innovation and Its Diffusion

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2008-01-01

    Purpose: The purpose of this paper is to reflect on and inform about learning points from ECUANET, a two-year duration best practice action research and transnational networking project as it approaches its final stage. Design/methodology/approach: The paper explicates the key positive and obfuscating dynamics that the project team have had to,…

  1. 77 FR 4492 - Endangered and Threatened Wildlife and Plants; Reissuance of Interim Special Rule for the Polar Bear

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... order in regard to Misc. No. 08- 764 (EGS) MDL Docket No. 1993 IN RE: POLAR BEAR ENDANGERED SPECIES ACT... (Service), published a final rule listing the polar bear (Ursus maritimus) as a threatened species... Special Rule for the Polar Bear AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY...

  2. 78 FR 59791 - Annual Company-Run Stress Tests at Banking Organizations With Total Consolidated Assets of More...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Stress Tests at Banking Organizations With Total Consolidated Assets of More Than $10 Billion But Less... Stress Test Cycle AGENCY: Board of Governors of the Federal Reserve System (Board). ACTION: Interim final... framework) in their stress tests for the stress test cycle that begins October 1, 2013. For this stress test...

  3. Manifestation Determination Reviews and School Team Decision-Making with Students with Emotional/Behavioral Disabilities

    ERIC Educational Resources Information Center

    Walker, Jennifer D.

    2013-01-01

    Manifestation determination teams are required by law to determine the relationship between a student's disability and behaviors that lead to disciplinary action when a student with a disability is either excluded from school for more than 10 days, is put in an interim alternative placement, or is under consideration for a change in placement.…

  4. Turning Points: States in Action. An Interim Report of the Middle Grade School State Policy Initiative.

    ERIC Educational Resources Information Center

    Council of Chief State School Officers, Washington, DC. Resource Center on Educational Equity.

    This report analyzes the experiences of 27 states selected to participate in Carnegie Corporation of New York's Middle Grade School State Policy Initiative (MGSSPI), a 3-year grant program to states to stimulate fundamental reform in schools serving 10- to 15-year old students. MGSSPI states are working to radically transform the education…

  5. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  6. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  7. Community Environmental Response Facilitation Act (CERFA) report, Fort Benjamin Harrison, Indiana. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    Fort Benjamin Harrison (FBH) has been investigated by Arthur D. Little, Inc. under the Community Environmental Response Facilitation Act (CERFA). FBH is located 12 miles northeast of downtown Indianapolis, Indiana. The installation's mission includes administrative and training activities. The objective of CERFA is to expeditiously identify real property offering the greatest opportunity for immediate reuse and redevelopment. This investigation included interviews, visual inspections, and review of existing documents, regulatory records, data bases, and title documents. This information was used to divide the installation into four categories of parcels. CERFA parcels approximately 1,825 acres of the facility have no history ofmore » Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) regulated hazardous substance or petroleum product release, disposal, or storage. CERFA parcels with qualifiers approximately 78 acres had no evidence of such release, disposal, or storage, but contained non-CERCLA hazards, such as asbestos or radon. CERFA disqualified parcels for approximately 399 acres of the investigated areas there is a history of release, disposal, or storage for one year or more of CERCLA-regulated hazardous substances or petroleum products; and CERFA excluded parcels approximately 201 acres have an existing mandate for retention by the federal government or have already been designated for transfer.« less

  8. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  9. PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FARABEE OA; HERZOG B; CAMERON C

    2012-02-16

    The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft)more » long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.« less

  10. The role and challenges of the food industry in addressing chronic disease

    PubMed Central

    2010-01-01

    Summary Increasingly, food companies play an important role in stemming the rising burden of nutrition-related chronic diseases. Concrete actions taken by these companies include global public commitments to address food reformulation, consumer information, responsible marketing, promotion of healthy lifestyles, and public-private partnerships. These actions are reviewed together with eleven specific PepsiCo goals and commitments that address products, the marketplace, and communities at large. Interim progress on these goals and commitments are discussed as well as constraints hampering faster progress. Further disease prevention depends on increasing implementation of private-public initiatives. PMID:20509876

  11. Health and environmental effects profile for 2,4-dimethylaniline and 2,4-dimethylaniline hydrochloride

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-01-01

    The Health and Environmental Effects Profile for 2-4-Dimethylaniline and 2,4-Dimethylaniline Hydrochloride was prepared to support listings of hazardous constituents of a wide range of waste streams under Section 3001 of the Resource Conservation and Recovery Act (RCRA) and to provide health-related limits for emergency actions under Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency program office files were evaluated as they pertained to potential human-health, aquatic-life and environmental effects of hazardous-waste constituents. The human carcinogen potency factors (q1*) for 2-4-dimethylaniline and 2,4-dimethylaniline hydrochloride are 0.75 and 0.58/(mg/kg/day) respectively,more » for oral exposure. The Reportable Quantity (RQ) value for 2-4-dimethylaniline and 2,4-dimethylaniline Hydrochloride is 1000.« less

  12. Health and environmental effects profile for 4-chloro-2-methylaniline and 4-chloro-2-methylaniline hydrochloride

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-12-01

    The Health and Environmental Effects Profile for 4-chloro-2-methylaniline and 4-chloro-2-methylaniline hydrochloride was prepared to support listings of hazardous constituents of a wide range of waste streams under Section 3001 of the Resource Conservation and Recovery Act (RCRA) and to provide health-related limits for emergency actions under Section 101 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Both published literature and information obtained from Agency program office files were evaluated as they pertained to potential human-health, aquatic-life and environmental effects of hazardous-waste constituents. The human carcinogen potency factors (q1*) for 4-chloro-2-methylaniline and 4-chloro-2-methylaniline hydrochloride are 0.58 and 0.46/(mg/kg/day), respectively,more » for oral exposure. The Reportable Quantity (RQ) value for 4-chloro-2-methylaniline and 4-chloro-2-methylaniline hydrochloride is 5000.« less

  13. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  14. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  15. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  16. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-09-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigations/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating establishment technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies requires by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  17. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-02-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating established technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies required by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  18. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  19. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  20. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  1. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  2. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  3. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  4. 40 CFR 305.35 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  5. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less

  6. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  7. CERCLA and EPCRA Continuous Release Reporting

    EPA Pesticide Factsheets

    Congress established reportable quantities for Superfund hazardous substances. A continuous release of a hazardous substance is defined as being without interruption or abatement and stable in quantity and rate.

  8. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  9. Israel: Background and U.S. Relations in Brief

    DTIC Science & Technology

    2017-01-06

    future Israeli-Palestinian negotiations by Secretary of State John Kerry on December 28, 2016, and other statements and actions related to issues of...Interim Agreement; permanent status to be determined through further negotiation . The status of the Gaza Strip is a final status issue to be resolved...through negotiations . Israel proclaimed Jerusalem as its capital in 1950, but the United States, like nearly all other countries, retains its embassy in

  10. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan... notified the MPO and DOT; and (10) VOC, SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator... effect in the analysis year, except that regulatory TCMs may not be assumed to begin at a future time...

  11. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    operators and visitors, will be required to wear a personal hydrazine dosimeter at all times. These will be available from commercial sources and/or the Naval...suspectea or carcinogenic pocen:tal for =an. -- t, :t ha a,,-cn OSL ?:L. Is I pPm or 1.3 mg/m 3 . zo pp=n4p"NIOSI. (1978) hs a oe -nded a ceiling level

  12. Data breaches. Final rule.

    PubMed

    2008-04-11

    This document adopts, without change, the interim final rule that was published in the Federal Register on June 22, 2007, addressing data breaches of sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). This final rule implements certain provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006. The regulations prescribe the mechanisms for taking action in response to a data breach of sensitive personal information.

  13. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  14. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  15. 40 CFR 305.21 - Amendment of request for a hearing; withdrawal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND...

  16. Guidance: Treatment of Insurers Under Superfund

    EPA Pesticide Factsheets

    Guidance provides EPA Regional offices with the appropriate procedures to follow in issuing notice letters, developing referrals, and tracking CERCLA enforcement cases that may include insurers as third party defendants.

  17. Administrative Order - Cherokee Oil

    EPA Pesticide Factsheets

    Contains legal consent agreement for Cherokee Oil Resources under CERCLA section 122(g) (4), Charlotte, Mecklenburg County, North Carolina, August 4, 1997 Region ID: 04 DocID: 28332, DocDate: 08-04-1997

  18. Superfund record of decision (EPA Region 4): Marine Corps Base (site 35), operable unit 10, Camp Lejeune, NC, September 22, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    This decision document presents the selected remedy for surficial groundwater for a portion of Operable Unit (OU) No. 10 (Site 35), Marine Corps Base (MCB), Camp Lejeune, North Carolina. Five Remedial Action Alternatives (RAAs) were evaluated as part of an interim remedial investigation/feasibility study for surficial groundwater at OU No. 10 (Site 35). These RAAs included RAA 1 (No Action), RAA 2 (No Action With Institutional Controls), RAA 3 (Groundwater Collection and On-site Treatment), RAA 4 (In Situ Air Sparging and Off-Gas Carbon Adsorption) and RAA 5 (In Well Aeration and Off-Gas Adsorption). After all five RAAs were compared tomore » established criteria, RAA 5 was selected as the preferred alternative.« less

  19. Consolidated List of Lists

    EPA Pesticide Factsheets

    List of chemicals subject to reporting requirements under the Emergency Planning and Community Right- To-Know Act (EPCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and Section 112(r) of the Clean Air Act.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  1. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  2. Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

    DTIC Science & Technology

    1982-06-01

    these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase

  3. JPRS Report, Near East & South Asia, Pakistan

    DTIC Science & Technology

    1992-06-11

    of emotion , and, at the end of the 14-year crisis in Afghanistan, form an interim council government of the mujaheddin; and, with unanimous...masses of Afghanistan came to our country, they were accompanied by their criminal, terrorist, antisocial , and enemy agents. There was no way for us to...Sindh is the irresponsible behaviour , incompetence and lack of action by the police. Had it not been for the police department’s failure to carry

  4. 77 FR 69620 - Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Research Corp, American Chemical Etching, American Magnetics Corporation, American Rubber Manufacturing... Unified School District, Santa Clara Valley Water District, Santa Maria Ford, Santa Maria Valley Warehouse...

  5. Summary of the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund)

    EPA Pesticide Factsheets

    CERCLA provides a Federal Superfund to clean up uncontrolled or abandoned hazardous-waste sites as well as accidents, spills, and other emergency releases of pollutants and contaminants into the environment

  6. Role of Background in the CERCLA Cleanup Program

    EPA Pesticide Factsheets

    This document clarifies the U.S. Environmental Protection Agency (EPA) preferred approach for the consideration of background constituent concentrations of hazardous substances, pollutants, and contaminants in certain steps of the remedy selection process

  7. 77 FR 74192 - Availability of Final Toxicological Profiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Road NE., Atlanta, Georgia 30333; telephone number (800) 232-4636 or (770)488-3351. Electronic access... literature, research, and studies on the health effects of toxic substances'' under CERCLA Section 104(i)(1...

  8. 77 FR 123 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling party: Waste Management Recycling & Disposal Services of California, Inc., dba Bradley Landfill & Recycling Center. The settlement requires the settling party to pay a total of $185,734 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  9. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  10. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  11. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interimmore » Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.« less

  12. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  13. Review of ecological-based risk management approaches used at five Army Superfund sites.

    PubMed

    Poucher, Sherri L; Tracey, Gregory A; Johnson, Mark S; Haines, Laurie B

    2012-04-01

    Factors used in environmental remedial decision making concerning ecological risk are not well understood or necessarily consistent. Recent Records of Decision (RODs) for Army CERCLA sites were reviewed to select case studies where remedial management occurred in response to ecological risks. Thirty-four Army RODs were evaluated representing decisions promulgated between 1996 and 2004. Five were selected based on assessments that remedial actions were clearly linked to concern for ecological receptors. The Ecological Risk Assessment (ERA) approach and the subsequent risk management process were reviewed for each site. The case studies demonstrated that the ERA findings, as well as critical management decisions regarding interpretation of identified ecological risks, were determinants of remedial action objectives. Decisions regarding the selection of remedial alternatives were based on a set of criteria prescribed by Superfund requirements and guidance. Remedial alternative evaluations require protection of human health and the environment, but protective conditions were determined using different methods at each site. Examining the remedial management process for the 5 case study sites revealed that uncertainty in the risk assessment and decisions regarding appropriate spatial scales for both risk assessment and remediation were important factors influencing remedial action decisions. The case reviews also revealed that levels of documentation were variable from site to site. In the future, more detailed documentation of decision criteria and the development of criteria that consider the resilience of the site will result in more technically defensible ecological risk management. Copyright © 2011 SETAC.

  14. Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

  15. Remedial investigation report for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Remedial investigation results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuen, C. R.; Martino, L. E.; Biang, R. P.

    2000-03-14

    This report presents the results of the remedial investigation (RI) conducted at J-Field in the Edgewood Area of Aberdeen Proving Ground (APG), a U.S. Army installation located in Harford County, Maryland. Since 1917, activities in the Edgewood Area have included the development, manufacture, and testing of chemical agents and munitions and the subsequent destruction of these materials at J-Field by open burning and open detonation. These activities have raised concerns about environmental contamination at J-Field. This RI was conducted by the Environmental Conservation and Restoration Division, Directorate of Safety, Health and Environmental Division of APG, pursuant to requirements outlined undermore » the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). The RI was accomplished according to the procedures developed by the U.S. Environmental Protection Agency (EPA 1988). The RI provides a comprehensive evaluation of the site conditions, nature of contaminants present, extent of contamination, potential release mechanisms and migration pathways, affected populations, and risks to human health and the environment. This information will be used as the basis for the design and implementation of remedial actions to be performed during the remedial action phase, which will follow the feasibility study (FS) for J-Field.« less

  16. Considerations Taken in Developing the Frequency Assignment Guidelines for Communications in the Mars Region Provided in SFCG Recommendation 22-1, (SFCG Action Item No. 23/10)

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Peng, Ted; Sue, Miles K.

    2004-01-01

    In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.

  17. Natural Resource Damages: Trustees

    EPA Pesticide Factsheets

    CERCLA and OPA authorize the United States, States, and Indian Tribes to act on behalf of the public as Natural Resource Trustees for natural resources under their respective trusteeship. OPA also authorizes foreign governments to act as Trustees.

  18. Agreement for Recovery of Response Costs

    EPA Pesticide Factsheets

    Contains legal agreement for the New Hanover County Airport Burn Pit Superfund site under CERCLA Section 122(h)(1), Wilmington, New Hanover County, North Carolina, November 21, 2006 DocID: 10301795, DocDate: 11-21-2006

  19. Laws and Executive Orders

    EPA Pesticide Factsheets

    Lists and links to descriptions of the major laws and executive orders that EPA administers and/or that guide EPA rulemakings, including the Clean Air Act, the Toxic Substance Control Act, CERCLA or Superfund, and the Clean Water Act.

  20. Agreement for Recovery of Past Response Costs - Georgia-Pacific Hardwod

    EPA Pesticide Factsheets

    Contains legal agreement for the Georgia-Pacific Hardwood Sawmill site under CERCLA Section 122(h)(1), Plymouth, Washington County, North Carolina, April 27, 2005 DocID: 10102191 , DocDate: 04-27-2005

Top