Sample records for champlain bridge construction

  1. 33 CFR 165.T01-0176 - Regulated Navigation Area; Lake Champlain Bridge Construction, Crown Point, New York and Chimney...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Champlain Bridge Construction, Crown Point, New York and Chimney Point, Vermont. 165.T01-0176 Section 165...; Lake Champlain Bridge Construction, Crown Point, New York and Chimney Point, Vermont. (a) Description... and south of the Lake Champlain Bridge construction zone at Crown Point, New York and Chimney Point...

  2. 75 FR 22228 - Regulated Navigation Area; Lake Champlain Bridge Construction Zone, NY and VT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ...-AA11 Regulated Navigation Area; Lake Champlain Bridge Construction Zone, NY and VT AGENCY: Coast Guard... establishing a regulated navigation area around the construction zone of the Lake Champlain Bridge between... on all vessels transiting the navigable waters of Lake Champlain in the vicinity of the bridge...

  3. 75 FR 21990 - Safety Zone; Extended Debris Removal in the Lake Champlain Bridge Construction Zone (Between...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ...-AA00 Safety Zone; Extended Debris Removal in the Lake Champlain Bridge Construction Zone (Between... surrounding the Lake Champlain Bridge construction zone between Chimney Point, VT and Crown Point, NY. This... of debris from the old Crown Point bridge demolition. The debris must be cleared from the navigable...

  4. 33 CFR 165.T01-0176 - Regulated Navigation Area; Lake Champlain Bridge Construction, Crown Point, New York and Chimney...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the regulated navigation area (RNA). All navigable waters on Lake Champlain 300 yards to the north... conditions apply within this RNA: (1) No vessel may operate at a speed in excess of five knots. (2) All vessels must proceed through the area with caution and operate in such a manner as to produce no wake. (3...

  5. 33 CFR 117.797 - Lake Champlain.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lake Champlain. 117.797 Section 117.797 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New York § 117.797 Lake Champlain. (a) The drawspan...

  6. 77 FR 67319 - Drawbridge Operation Regulation; Lake Champlain, Swanton, VT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Central Railroad. As a result, in 2012, the operating system was modified by adding electric bridge...: Notice of proposed rulemaking. SUMMARY: The Coast Guard proposes to modify the operating schedule that... owner of the bridge has requested to operate the bridge from a remote location, at St. Albans, Vermont...

  7. 78 FR 14444 - Drawbridge Operation Regulation; Lake Champlain, Swanton, VT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ..., in 2012, the operating system was modified by adding electric bridge opening motors to swing the draw... Central Railroad Bridge has requested to operate the bridge from a remote location, at St. Albans, Vermont... regulations are listed at 33 CFR 117.993(c), which require the draw to operate as follows: From June 15...

  8. Mass balance assessment for mercury in Lake Champlain

    USGS Publications Warehouse

    Gao, N.; Armatas, N.G.; Shanley, J.B.; Kamman, N.C.; Miller, E.K.; Keeler, G.J.; Scherbatskoy, T.; Holsen, T.M.; Young, T.; McIlroy, L.; Drake, S.; Olsen, Bill; Cady, C.

    2006-01-01

    A mass balance model for mercury in Lake Champlain was developed in an effort to understand the sources, inventories, concentrations, and effects of mercury (Hg) contamination in the lake ecosystem. To construct the mass balance model, air, water, and sediment were sampled as a part of this project and other research/monitoring projects in the Lake Champlain Basin. This project produced a STELLA-based computer model and quantitative apportionments of the principal input and output pathways of Hg for each of 13 segments in the lake. The model Hg concentrations in the lake were consistent with measured concentrations. Specifically, the modeling identified surface water inflows as the largest direct contributor of Hg into the lake. Direct wet deposition to the lake was the second largest source of Hg followed by direct dry deposition. Volatilization and sedimentation losses were identified as the two major removal mechanisms. This study significantly improves previous estimates of the relative importance of Hg input pathways and of wet and dry deposition fluxes of Hg into Lake Champlain. It also provides new estimates of volatilization fluxes across different lake segments and sedimentation loss in the lake. ?? 2006 American Chemical Society.

  9. The origin and distribution of subbottom sediments in southern Lake Champlain.

    USGS Publications Warehouse

    Freeman-Lynde, R. P.; Hutchinson, D.R.; Folger, D.W.; Wiley, B.H.; Hewett, M.J.

    1980-01-01

    3 units, correlatable with recent Lake Champlain, late-glacial marine Champlain Sea, and proglacial Lake Vermont sediments, have been identified from seismic reflection profiles and 8 piston cores. Lake Vermont deposits are nonfossiliferous and range from thin to absent nearshore and on bedrock highs to more than 126 m thick near Split Rock Point. Champlain Sea sediments contain marine foraminifers and ostracodes and are fairly uniform in thickness (20-30 m). Recent Lake Champlain sediments range in thickness from 0 to 25 m. Average sedimentation rates for Lake Vermont are considerably higher (4-8 cm/yr) than those for the Champlain Sea (0.8-1.2 cm/yr) and Lake Champlain (0.14-0.15 cm/yr). Bedrock, till, and deltaic and alluvial deposits were also identified.- from Authors

  10. Watershed Modeling Recommendation Report for Lake Champlain TMDL

    EPA Pesticide Factsheets

    This report describes the recommended modeling approach for watershed modeling component of the Lake Champlain TMDL project. The report was prepared by Tetra Tech, with input from the Lake Champlain watershed analysis workgroup. (TetraTech, 2012a)

  11. In-lake Modeling Recommendation Report for Lake Champlain TMDL

    EPA Pesticide Factsheets

    This report describes the recommended modeling approach for the in-lake modeling component of the Lake Champlain TMDL project. The report was prepared by Tetra Tech, with input from the Lake Champlain modeling workgroup. (TetraTech, 2012b)

  12. 75 FR 82061 - Lake Champlain Sea Lamprey Control Alternatives Workgroup

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ...] Lake Champlain Sea Lamprey Control Alternatives Workgroup AGENCY: Fish and Wildlife Service, Interior... of the Lake Champlain Sea Lamprey Control Alternatives Workgroup (Workgroup). The Workgroup's purpose... sea lamprey control techniques alternative to lampricide that are technically feasible, cost effective...

  13. 76 FR 43698 - Lake Champlain Sea Lamprey Control Alternatives Workgroup

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ...] Lake Champlain Sea Lamprey Control Alternatives Workgroup AGENCY: Fish and Wildlife Service, Interior... of the Lake Champlain Sea Lamprey Control Alternatives Workgroup (Workgroup). The Workgroup's purpose... implementation of sea lamprey control techniques alternative to lampricide that are technically feasible, cost...

  14. 40 CFR 81.48 - Champlain Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.48 Champlain Valley Interstate Air Quality Control Region. The Champlain Valley Interstate Air Quality Control Region (Vermont-New York) has been revised to consist of the...

  15. 40 CFR 81.48 - Champlain Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.48 Champlain Valley Interstate Air Quality Control Region. The Champlain Valley Interstate Air Quality Control Region (Vermont-New York) has been revised to consist of the...

  16. 40 CFR 81.48 - Champlain Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.48 Champlain Valley Interstate Air Quality Control Region. The Champlain Valley Interstate Air Quality Control Region (Vermont-New York) has been revised to consist of the...

  17. 40 CFR 81.48 - Champlain Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.48 Champlain Valley Interstate Air Quality Control Region. The Champlain Valley Interstate Air Quality Control Region (Vermont-New York) has been revised to consist of the...

  18. 40 CFR 81.48 - Champlain Valley Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES Designation of Air Quality Control Regions § 81.48 Champlain Valley Interstate Air Quality Control Region. The Champlain Valley Interstate Air Quality Control Region (Vermont-New York) has been revised to consist of the...

  19. Valuing wetland attributes in the Lake Champlain Basin

    Treesearch

    Donald F. Dennis; Walter F. Kuentzel

    1998-01-01

    This research explores the use of conjoint analysis to assess and understand wetland values. A conjoint rating survey was designed and mailed to landowners in the Laplatte River Basin (Lake Champlain) in Vermont. Landowners rated options to protect wetlands that varied by the wetland's ability to decrease pollutants entering Lake Champlain, value in providing food...

  20. Seismic Triggers of Lacustrine Subaqueous Landslides in Lake Champlain, USA

    NASA Astrophysics Data System (ADS)

    Manley, P.; Manley, T.; Ghosh, S. J.; Rosales-Underbrink, P.; Silverhart, P.

    2017-12-01

    Lacustrine slumps and debris flows (landslides) have been identified in Lake Champlain via Multibeam and CHIRP (compressed high intensity radar pulse) seismic profile data. Numerous large landslides studied by Ghosh (2012), Rosales-Underbrink (2015), and Silverhart (2016) have shown that many of these landslides are coeval. All landslides failed on a specific interface between marine Champlain Sea and modern lacustrine Lake Champlain sediments. Utilizing radionuclide dating on sediment from the unfailed slopes or undisturbed sediment above failed deposits, sedimentation rates were determined and used to calculate the approximate failure ages for each of the landslides studied. The northernmost failure, south of the Bouquet River, occurred about 950-1200 cal yr BP and is the first mass wasting event of this age to be recorded on Lake Champlain. The remaining landslides failed about 4500-5200 cal yr BP and agree with nearby Western Quebec Seismic Zone (WQSZ) with clusters of terrestrial landslides occurring at 1000 and 5000 cal yr BP triggered by large earthquakes (Brooks, 2015) along the same interface. The 5000 cal yr BP event has been attributed to a M 6.4 or greater earthquake within the WQSZ. The coeval landslides observed in Lake Champlain were likely triggered by this same earthquake. Lake tsunami models show that these simultaneous landslide failures can generate surface waves wave that can impact the Lake Champlain shoreline within 3-10 minutes after the earthquake.

  1. Outdoor recreation opportunities and land use change in Vermont's Lake Champlain Basin

    Treesearch

    John J. Lindsay

    1995-01-01

    Outdoor recreation resources are eroding in Vermont's Lake Champlain Basin due to urban expansion. This study measured urban growth in the Basin and identified critical areas for open space protection. The study's hypothesis, that there was no difference between the Champlain Basin and other parts of urbanizing New England that have lost outdoor recreation...

  2. 33 CFR 110.8 - Lake Champlain, N.Y. and Vt.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lake Champlain, N.Y. and Vt. 110... ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.8 Lake Champlain, N.Y. and Vt. (a) Ticonderoga, N.Y. An area shoreward of a line bearing 312° from Ticonderoga Light to the southeast corner of the...

  3. Evaluation of pyrolysis and arc tracking on candidate wire insulation designs for space applications

    NASA Technical Reports Server (NTRS)

    Stueber, Thomas J.; Hrovat, Kenneth

    1994-01-01

    The ability of wire insulation materials and constructions to resist arc tracking was determined and the damage caused by initial arcing and restrike events was assessed. Results of arc tracking tests on various insulation constructions are presented in view-graph format. Arc tracking tests conducted on Champlain, Filotex, and Teledyne Thermatics indicate the Filotex is least likely to arc track. Arc tracking occurs more readily in air than it does in vacuum.

  4. Development of the Champlain primary care cardiovascular disease prevention and management guideline

    PubMed Central

    Montoya, Lorraine; Liddy, Clare; Hogg, William; Papadakis, Sophia; Dojeiji, Laurie; Russell, Grant; Akbari, Ayub; Pipe, Andrew; Higginson, Lyall

    2011-01-01

    Abstract Problem addressed A well documented gap remains between evidence and practice for clinical practice guidelines in cardiovascular disease (CVD) care. Objective of program As part of the Champlain CVD Prevention Strategy, practitioners in the Champlain District of Ontario launched a large quality-improvement initiative that focused on increasing the uptake in primary care practice settings of clinical guidelines for heart disease, stroke, diabetes, and CVD risk factors. Program description The Champlain Primary Care CVD Prevention and Management Guideline is a desktop resource for primary care clinicians working in the Champlain District. The guideline was developed by more than 45 local experts to summarize the latest evidence-based strategies for CVD prevention and management, as well as to increase awareness of local community-based programs and services. Conclusion Evidence suggests that tailored strategies are important when implementing specific practice guidelines. This article describes the process of creating an integrated clinical guideline for improvement in the delivery of cardiovascular care. PMID:21673196

  5. Lake whitefish diet, condition, and energy density in Lake Champlain and the lower four Great Lakes following dreissenid invasions

    USGS Publications Warehouse

    Herbst, Seth J.; Marsden, J. Ellen; Lantry, Brian F.

    2013-01-01

    Lake Whitefish Coregonus clupeaformis support some of the most valuable commercial freshwater fisheries in North America. Recent growth and condition decreases in Lake Whitefish populations in the Great Lakes have been attributed to the invasion of the dreissenid mussels, zebra mussels Dreissena polymorpha and quagga mussels D. bugensis, and the subsequent collapse of the amphipod, Diporeia, a once-abundant high energy prey source. Since 1993, Lake Champlain has also experienced the invasion and proliferation of zebra mussels, but in contrast to the Great Lakes, Diporeia were not historically abundant. We compared the diet, condition, and energy density of Lake Whitefish from Lake Champlain after the dreissenid mussel invasion to values for those of Lake Whitefish from Lakes Michigan, Huron, Erie, and Ontario. Lake Whitefish were collected using gill nets and bottom trawls, and their diets were quantified seasonally. Condition was estimated using Fulton's condition factor (K) and by determining energy density. In contrast to Lake Whitefish from some of the Great Lakes, those from Lake Champlain Lake Whitefish did not show a dietary shift towards dreissenid mussels, but instead fed primarily on fish eggs in spring, Mysis diluviana in summer, and gastropods and sphaeriids in fall and winter. Along with these dietary differences, the condition and energy density of Lake Whitefish from Lake Champlain were high compared with those of Lake Whitefish from Lakes Michigan, Huron, and Ontario after the dreissenid invasion, and were similar to Lake Whitefish from Lake Erie; fish from Lakes Michigan, Huron, and Ontario consumed dreissenids, whereas fish from Lake Erie did not. Our comparisons of Lake Whitefish populations in Lake Champlain to those in the Great Lakes indicate that diet and condition of Lake Champlain Lake Whitefish were not negatively affected by the dreissenid mussel invasion.

  6. A Relationship Between Microbial Activity in Soils and Phosphate Levels in Tributaries to Lake Champlain

    NASA Astrophysics Data System (ADS)

    Larose, R.; Lee, S.; Lane, T.

    2015-12-01

    Lake Champlain is a large natural freshwater lake. It forms the western boundary of Vermont and drains over half of the state. It is bordered by the state of New York on its western side and drains to the north into Quebec, Canada. Lake Champlain is the source of fresh drinking water for over quarter of a million people and provides for the livelihoods and recreational opportunities of many well beyond its borders. The health of this lake is important. During the summer month's algae blooms plague the lake. These unsightly growths, which affect other aquatic organisms, are the result of excess phosphate flowing into the lake from many sources. Examining whether there is a relationship between microbial activity in the soils bordering tributaries to Lake Champlain and phosphate levels in those tributaries sheds insight into the origins and paths by which phosphate moves into Lake Champlain. Understanding the how phosphate moves into the water system may assist in mitigation efforts.Total Phosphate levels and Total Suspended Solids were measured in second and third order streams in the Lake Champlain Basin over a three-year period. In addition microbial activity was measured within the toe, bank and upland riparian zone areas of these streams during the summer months. In general in areas showing greater microbial activity in the soil(s) there were increased levels of phosphate in the streams.

  7. Impacts of post-glacial lake drainage events and revised chronology of the Champlain Sea episode 13-9 ka

    USGS Publications Warehouse

    Cronin, T. M.; Manley, P.L.; Brachfeld, S.; Manley, T.O.; Willard, D.A.; Guilbault, J.-P.; Rayburn, J.A.; Thunell, R.; Berke, M.

    2008-01-01

    Lithologic, CHIRP (Compressed High Intensity Radar Pulse) sonar, paleomagnetic, stable isotopic and micropaleontological analyses of sediment cores from Lake Champlain (New York, Vermont) were used to determine the age of the post-glacial Champlain Sea marine episode, the timing of salinity changes and their relationship to freshwater discharge from mid-continent glacial lakes. Calibrated radiocarbon ages on plant material provide an improved post-glacial chronology overcoming problems from shell ages caused by carbon reservoir effects up to 1500 yr. The final drainage of glacial Lake Vermont and the inception of marine conditions occurred ∼ 13.1–12.8 ka (kiloannum, calendar years) and a sharp decrease in Champlain Sea salinity from ∼ 25 to 7–8 psu (practical salinity units) occurred approximately 11.4–11.2 ka. Reduced salinity was most likely caused by rapid freshwater inflow eastward from glacial Lake Algonquin into the Champlain Basin. The timing of inferred freshwater event coincides with the widespread climatic cooling called the Preboreal Oscillation.

  8. Lake Champlain TMDL Modeling Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This document presents the quality assurance project plan for providing support to US EPA Region 1 in revising the Lake Champlain Total Maximum Daily Load, under Contract Number EP-C-08-004, Task Order 80.

  9. Retail food reform: How to effectively bridge what we say and what we do in our hospital settings.

    PubMed

    Dojeiji, Laurie; Taylor, Andra; Boland, Cholly; Brennan, Carolyn; Penney, Randy

    2017-03-01

    Hospital leaders in Eastern Ontario, Canada, have acknowledged the critical role of food to health and the need for progressive change that goes beyond personal responsibility paradigms. The Healthy Foods in Champlain Hospitals program aims to create supportive, healthy nutrition environments in hospital retail food settings. Twenty independent hospital corporations have collectively initiated a plan to transition cafeteria, vending, franchise, and volunteer operations towards healthier offerings. Hospitals are actively implementing a set of progressively phased, evidence-based nutrition criteria, which cover food and beverage categories, preparation methods, product placement, and provision of nutrition information. Implementation strategies and successes, as well as challenges and limitations, are discussed.

  10. SWAT Model Configuration, Calibration and Validation for Lake Champlain Basin

    EPA Pesticide Factsheets

    The Soil and Water Assessment Tool (SWAT) model was used to develop phosphorus loading estimates for sources in the Lake Champlain Basin. This document describes the model setup and parameterization, and presents calibration results.

  11. 33 CFR 110.8 - Lake Champlain, N.Y. and Vt.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.8 Lake Champlain, N.Y. and Vt. (a) Ticonderoga...°14′05″ W. Note: The anchoring of vessels and placement of temporary moorings in the anchorage area...

  12. 33 CFR 110.8 - Lake Champlain, N.Y. and Vt.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.8 Lake Champlain, N.Y. and Vt. (a) Ticonderoga...°14′05″ W. Note: The anchoring of vessels and placement of temporary moorings in the anchorage area...

  13. 33 CFR 110.8 - Lake Champlain, N.Y. and Vt.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.8 Lake Champlain, N.Y. and Vt. (a) Ticonderoga...°14′05″ W. Note: The anchoring of vessels and placement of temporary moorings in the anchorage area...

  14. 33 CFR 110.8 - Lake Champlain, N.Y. and Vt.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.8 Lake Champlain, N.Y. and Vt. (a) Ticonderoga...°14′05″ W. Note: The anchoring of vessels and placement of temporary moorings in the anchorage area...

  15. August 2015 Proposed Total Maximum Daily Load Document and Appendices for Vermont Segments of Lake Champlain

    EPA Pesticide Factsheets

    These documents provide allocations of phosphorus loads to Lake Champlain to meet water quality criteria, describe basis for allocation for future growth, & describe how implementation measures were simulated to determine that allocations can be achieved

  16. Astronauts Conrad and Cooper slice cake on U.S.S. Lake Champlain

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Astronauts Charles Conrad Jr. (left) and L. Gordon Cooper Jr. prepate to slice into the huge cake prepared for them by the cooks onboard the aircraft carrier U.S.S. Lake Champlain. They are using ornamental Navy swords for knives.

  17. 75 FR 10229 - Application for Presidential Permit; Champlain Hudson Power Express, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    .... electric power supply system under normal and contingency conditions, and any other factors that DOE may... Power Express, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Champlain Hudson Power Express, Inc. (CHPEI) has applied for a Presidential...

  18. 78 FR 76140 - Extension of Public Comment Period for the Champlain Hudson Power Express Transmission Line...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... Transmission Line Project Draft Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension... comment period for the Champlain Hudson Power Express Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0447). The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action...

  19. Flood-inundation maps for Lake Champlain in Vermont and in northern Clinton County, New York

    USGS Publications Warehouse

    Flynn, Robert H.; Hayes, Laura

    2016-06-30

    Digital flood-inundation maps for an approximately100-mile length of Lake Champlain in Addison, Chittenden, Franklin, and Grand Isle Counties in Vermont and northern Clinton County in New York were created by the U.S. Geological Survey (USGS) in cooperation with the International Joint Commission (IJC). The flood-inundationmaps, which can be accessed through the International Joint Commission (IJC) Web site at http://www.ijc.org/en_/, depict estimates of the areal extent flooding correspondingto selected water levels (stages) at the USGS lake gage on the Richelieu River (Lake Champlain) at Rouses Point, N.Y. (station number 04295000). In this study, wind and seiche effects (standing oscillating wave with a long wavelength) were not taken into account and the flood-inundation mapsreflect 11 stages (elevations) for Lake Champlain that are static for the study length of the lake. Near-real-time stages at this lake gage, and others on Lake Champlain, may be obtained on the Internet from the USGS National Water Information System at http://waterdata.usgs.gov/ or the National Weather Service Advanced Hydrologic Prediction Service at http:/water.weather.gov/ahps/, which also forecasts flood hydrographs at the Richelieu River (Lake Champlain) at Rouses Point.Static flood boundary extents were determined for LakeChamplain in Addison, Chittenden, Franklin, and Grand Isle Counties in Vermont and northern Clinton County in New York using recently acquired (2013–2014) lidar (light detection and ranging) and may be referenced to any of the five USGS lake gages on Lake Champlain. Of these five lakgages, USGS lake gage 04295000, Richelieu River (Lake Champlain) at Rouses Point, N.Y., is the only USGS lake gage that is also a National Weather Service prediction location. Flood boundary extents for the Lake Champlain static flood-inundation map corresponding to the May 201 flood(103.2 feet [ft], National Geodetic Vertical Datum [NGVD] 29) were evaluated by comparing these boundary extents against the inundation area extents determined for the May 2011 flood (which incorporated documented high-water marksfrom the flood of May 201) (Bjerklie and others, 2014).A digital elevation model (DEM) was created by USGS, within a geographic information system (GIS), from the recently flown and processed light detection and ranging(lidar) data (2013–2014) in Vermont and the lake shore area of northern Clinton County in New York. The lidar data have a vertical accuracy of 0.3 to 0.6-ft (9.6 to 18.0-centimeters [cm]) and a horizontal resolution of 2.3 to 4.6 ft (0.7 to 1.4 meters). This DEM was used in determining the floodboundary for 11 flood stages at 0.5-ft intervals from 100.0 to104.0 ft (NGVD 29) and 1-ft intervals from 104.0 to 106.0 ft (NGVD 29) as referenced to the USGS lake gage 04295000, Richelieu River (Lake Champlain) at Rouses Point, N.Y. In addition, the May 2011 flood-inundation area for elevation103.20 ft (NGVD 29) (102.77 ft, North American Vertical Datum [NAVD] 88) was determined from this DEM. The May 2011 flood is the highest recorded lake water level (stage)at the Rouses Point, N.Y., lake gage. Flood stages greater than 101.5 ft (NGVD 29) exceed the “major flood stage”as defined by the NationalWeather Service for USGS lake gage 04295000.The availability of these maps, along with Internet information regarding current stage from the USGS lake gage and forecasted high-flow stages from the NationalWeather Service, will provide emergency management personnel and residents with information that is critical for flood responseactivities such as evacuations and road closures, as well as for post-flood recovery eforts.

  20. Environmental study of ERTS-1 imagery: Lake Champlain and Vermont

    NASA Technical Reports Server (NTRS)

    Lind, A. O.; Henson, E. B.; Pelton, J. O.

    1973-01-01

    Environmental concerns of the State of Vermont currently being stressed include water quality in Lake Champlain and a state-wide land use and capability plan. Significant results obtained from ERTS-1 relate directly to the above concerns. Industrial water pollution and turbidity in Lake Champlain have been identified and mapped and the ERTS pollution data will be used in the developing court suit which Vermont has initiated against the polluters. ERTS imagery has also provided a foundation for updating and revising land use inventories. Major classes of land use have been identified and mapped, and substantial progress has been made toward the mapping of such land use divisions as crop and forest type, and wetlands.

  1. ERTS-1 imagery of the Lake Champlain region: A first look

    NASA Technical Reports Server (NTRS)

    Lind, A. O. (Principal Investigator); Henson, E. B.; Olson, J.; Wagner, W. P.

    1972-01-01

    The author has identified the following significant results. First-look analysis of RBV imagery of Lake Champlain and adjacent areas provided the following information on land and water resources: (1) location and shape of islands over 200 meters at narrowest part; (2) location of manmade structures at least 10 meters across; (3) location of shoreline; (4) identification of algal blooms and major turbidity boundary; (5) identification of lake bottom features in sandy, shallow areas; (6) identification of major lake shore wetland and floodplain wetlands; (7) location of major streams; (8) identification of ice marginal deposits of major proportions and former shorelines of Champlain Sea; (9) identification of wooded areas, open land, and built-up areas.

  2. Quantifying sediment loadings from streambank erosion in selected agricultural watersheds draining to Lake Champlain

    USDA-ARS?s Scientific Manuscript database

    At its mouth on Lake Champlain the Missisquoi River has a history of exceedance of phosphorus concentration target levels endorsed by the governments of Vermont, Québec, and New York. Observations along the study reach of the Missisquoi River and several of its tributaries have indicated that the r...

  3. Genetic models reveal historical patterns of sea lamprey population fluctuations within Lake Champlain

    PubMed Central

    Azodi, Christina B.; Sheldon, Sallie P.; Trombulak, Stephen C.; Ardren, William R.

    2015-01-01

    The origin of sea lamprey (Petromyzon marinus) in Lake Champlain has been heavily debated over the past decade. Given the lack of historical documentation, two competing hypotheses have emerged in the literature. First, it has been argued that the relatively recent population size increase and concomitant rise in wounding rates on prey populations are indicative of an invasive population that entered the lake through the Champlain Canal. Second, recent genetic evidence suggests a post-glacial colonization at the end of the Pleistocene, approximately 11,000 years ago. One limitation to resolving the origin of sea lamprey in Lake Champlain is a lack of historical and current measures of population size. In this study, the issue of population size was explicitly addressed using nuclear (nDNA) and mitochondrial DNA (mtDNA) markers to estimate historical demography with genetic models. Haplotype network analysis, mismatch analysis, and summary statistics based on mtDNA noncoding sequences for NCI (479 bp) and NCII (173 bp) all indicate a recent population expansion. Coalescent models based on mtDNA and nDNA identified two potential demographic events: a population decline followed by a very recent population expansion. The decline in effective population size may correlate with land-use and fishing pressure changes post-European settlement, while the recent expansion may be associated with the implementation of the salmonid stocking program in the 1970s. These results are most consistent with the hypothesis that sea lamprey are native to Lake Champlain; however, the credibility intervals around parameter estimates demonstrate that there is uncertainty regarding the magnitude and timing of past demographic events. PMID:26539334

  4. A View of Water Quality Characteristics Pertinent to Phosphorus Movement in a Third Level Tributary to Lake Champlain

    NASA Astrophysics Data System (ADS)

    Witt, M.

    2017-12-01

    Lake Champlain is a large natural freshwater lake located in the northeastern United States. The lake provides fresh drinking water for over a quarter of a million people and affords for the livelihoods and recreational opportunities of many well beyond its borders. The health of Lake Champlain is important to the people of Vermont and beyond. During the summer months it is plagued by algal blooms. These unsightly and harmful growths affect other aquatic organisms and are the result of excess phosphate flowing into the lake. Missisquoi Bay in the far northern part of the lake is an area of concern. (Algal bloom Missisquoi Bay. Photo by Robert Galbraith) Measuring in-stream characteristics pertinent to phosphorus movement from the headwaters to the outflow of a third level tributary concurrently will provide important information regarding the movement of phosphorus into tributaries then on into Lake Champlain. Phosphorus, Total Suspended Solids, Temperature and Flow Rate were measured at the mouth, mid-point and headwaters of Black Creek. Black Creek is the last major contributor to the Missisquoi River before it flows into Missisquoi Bay, a bay in Lake Champlain. These measurements were made concurrently at low, normal and high water levels. Significant differences were found between temperature, total suspended solids and phosphate from the headwaters of Black Creek through to its outflow into the Missisquoi River. These characteristics pertinent to phosphorus movement indicated various rates of increase from headwaters to outflow.

  5. Assessing Climate Change Within Lake Champlain

    NASA Astrophysics Data System (ADS)

    Leibensperger, E. M.; Pierce, W.; Mihuc, T.; Myers, L.

    2016-12-01

    Lake Champlain is experiencing environmental stresses that have caused statistically significant biological, chemical, and physical trends. Such trends have already impacted management strategies within the Lake Champlain basin, which lies within the states of New York and Vermont and province of Quebec. A long-term monitoring program initiated in 1992 has revealed warming of upwards of 0.7°C per decade within certain regions of the lake; much faster than observed local atmospheric warming. Here we analyze the observed lake warming in the context of atmospheric variability and assess its uncertainty given monitoring frequency (biweekly to monthly), variable seasonal and hourly observation timing, and synoptic variability of lake dynamics. To address these issues, we use observations from a June-October 2016 deployment of a data buoy on Lake Champlain containing a 1-meter spaced thermistor chain and surface weather station. These new observations, and reanalysis of intensive monitoring during a campaign in 1993, indicate that synoptic variability of lake thermal structure lowers confidence in trends derived from infrequent observations. However, principal component analysis of lake thermal structure reveals two primary modes of variability that are predictable from atmospheric conditions, presenting an opportunity to improve interpretation of existing and future observations.

  6. Prevention of delayed referrals through the Champlain BASE eConsult service.

    PubMed

    Liddy, Clare; Drosinis, Paul; Fogel, Adam; Keely, Erin

    2017-08-01

    To identify the proportion and evaluate the content of eConsults (electronic consultations) in which the Champlain BASE (Building Access to Specialists through eConsultation) eConsult process prompted a referral to a specialist that was not originally contemplated by the primary care provider (PCP). Cross-sectional study of all eConsults submitted between April 15, 2011, and January 31, 2015. Champlain Local Health Integration Network, a large health region in eastern Ontario. Primary care providers registered to use the Champlain BASE eConsult service. Answers from a close-out survey-completed by PCPs at the conclusion of each eConsult-stating that specialist referral was not originally contemplated but that the eConsult process had prompted referral. The logs containing the communication exchanged between the PCPs and the specialists were reviewed, and each prompted referral case was categorized by the type of question asked, if pharmaceutical advice was given, if the referral was redirected to a different specialty group, and if the referral was urgent. A total of 188 (3.4%) of 5601 eConsults completed during the study period were cases in which PCPs stated that they had originally not contemplated referring the patient to a specialist but that the Champlain BASE eConsult process had prompted referral. Prompted referrals were most often directed to cardiologists (10.6%), dermatologists (10.6%), infectious disease specialists (9.0%), hematologists (9.0%), and urologists (8.5%). The most common questions were about diagnosis (34.0%), drug treatment (18.0%), and management (15.0%). Pharmaceutical advice was given in 28.0% of prompted referral cases, and in 26.0% of cases, the face-to-face referral was redirected to another specialty group. In 5.0% of cases, the specialist stated the referral was urgent. The median specialist response time was 0.96 days (interquartile range 0.17 to 3.80 days). By providing PCPs with increased access to specialists, the Champlain BASE eConsult service serves an important role in identifying and preventing the potential detrimental consequences of delayed medical referrals across specialty groups. Copyright© the College of Family Physicians of Canada.

  7. Groundwater quality in the Lake Champlain and Susquehanna River basins, New York, 2014

    USGS Publications Warehouse

    Scott, Tia-Marie; Nystrom, Elizabeth A.; Reddy, James E.

    2016-11-04

    In a study conducted by the U.S. Geological Survey in cooperation with the New York State Department of Environmental Conservation, groundwater samples were collected from 6 production wells and 7 domestic wells in the Lake Champlain Basin and from 11 production wells and 9 domestic wells in the Susquehanna River Basin in New York. All samples were collected from June through December 2014 to characterize groundwater quality in these basins. The samples were collected and processed using standard procedures of the U.S. Geological Survey and were analyzed for 148 physiochemical properties and constituents, including dissolved gases, major ions, nutrients, trace elements, pesticides, volatile organic compounds, radionuclides, and indicator bacteria.The Lake Champlain Basin study area covers the 3,050 square miles of the basin in northeastern New York; the remaining part of the basin is in Vermont and Canada. Of the 13 wells sampled in the Lake Champlain Basin, 6 are completed in sand and gravel, and 7 are completed in bedrock. Groundwater in the Lake Champlain Basin was generally of good quality, although properties and concentrations of some constituents— fluoride, iron, manganese, dissolved solids, sodium, radon-222, total coliform bacteria, fecal coliform bacteria, and Escherichia coli bacteria—sometimes equaled or exceeded primary, secondary, or proposed drinking-water standards. The constituent most frequently detected in concentrations exceeding drinking-water standards (5 of 13 samples) was radon-222.The Susquehanna River Basin study area covers the entire 4,522 square miles of the basin in south-central New York; the remaining part of the basin is in Pennsylvania. Of the 20 wells sampled in the Susquehanna River Basin, 11 are completed in sand and gravel, and 9 are completed in bedrock. Groundwater in the Susquehanna River Basin was generally of good quality, although properties and concentrations of some constituents—pH, chloride, sodium, dissolved solids, iron, manganese, aluminum, arsenic, barium, gross-alpha radioactivity, radon-222, methane, total coliform bacteria, and fecal coliform bacteria—sometimes equaled or exceeded primary, secondary, or proposed drinking-water standards. As in the Lake Champlain Basin, the constituent most frequently detected in concentrations exceeding drinking-water standards (13 of 20 samples) was radon-222.

  8. Environmental study of ERTS-1 imagery Lake Champlain Basin and Vermont

    NASA Technical Reports Server (NTRS)

    Lind, A. O. (Principal Investigator)

    1972-01-01

    The author has idenfified the following significant results. A first approximation land-type map using three categories of classification was generated for the Burlington area. The identification and mapping of a major turbidity front separating turbid waters of the southern arm of Lake Champlain from the clearer main water mass was reported on RBV 1 and 2 imagery and on subsequent MSS bands 4 and 5. Significant industrial pollution of Lake Champlain has degraded environmental quality in certain sections of the lake. Wetlands were detected and recognized using a combination of RBV bands 2 and 3. Using first-look RBV band 2 imagery, major ice marginal features were identified by using tonal patterns associated with vegetative cover. Major rivers were detected and recognized through the use of RBV band 3 imagery and MSS bands 6 and 7.

  9. Network global navigation satellite system surveys to harmonize American and Canadian datum for the Lake Champlain Basin

    USGS Publications Warehouse

    Flynn, Robert H.; Rydlund, Jr., Paul H.; Martin, Daniel J.

    2016-03-08

    Lake-gage water-surface elevations determined during the 3 days of surveys were converted to water-surface elevations referenced to the North American Vertical Datum of 1988 by using calculated offsets and historical water-surface elevations. In this report, an “offset” refers to the adjustment that needs to be applied to published data from a particular gage to produce elevation data referenced to the North American Vertical Datum of 1988. Offsets presented in this report can be used in the evaluation of water-surface elevations in a common datum for Lake Champlain and the Richelieu River. In addition, the water-level data referenced to the common datum (as determined from the offsets) may be used to calibrate flow models and support future modeling studies developed for Lake Champlain and the Richelieu River.

  10. Mercury in the pelagic food web of Lake Champlain.

    PubMed

    Miller, Eric K; Chen, Celia; Kamman, Neil; Shanley, James; Chalmers, Ann; Jackson, Brian; Taylor, Vivien; Smeltzer, Eric; Stangel, Pete; Shambaugh, Angela

    2012-04-01

    Lake Champlain continues to experience mercury contamination resulting in public advisories to limit human consumption of top trophic level fish such as walleye. Prior research suggested that mercury levels in biota could be modified by differences in ecosystem productivity as well as mercury loadings. We investigated relationships between mercury in different trophic levels in Lake Champlain. We measured inorganic and methyl mercury in water, seston, and two size fractions of zooplankton from 13 sites representing a range of nutrient loading conditions and productivity. Biomass varied significantly across lake segments in all measured ecosystem compartments in response to significant differences in nutrient levels. Local environmental factors such as alkalinity influenced the partitioning of mercury between water and seston. Mercury incorporation into biota was influenced by the biomass and mercury content of different ecosystem strata. Pelagic fish tissue mercury was a function of fish length and the size of the mercury pool associated with large zooplankton. We used these observations to parameterize a model of mercury transfers in the Lake Champlain food web that accounts for ecosystem productivity effects. Simulations using the mercury trophic transfer model suggest that reductions of 25-75% in summertime dissolved eplimnetic total mercury will likely allow fish tissue mercury concentrations to drop to the target level of 0.3 μg g(-1) in a 40-cm fish in all lake segments. Changes in nutrient loading and ecosystem productivity in eutrophic segments may delay any response to reduced dissolved mercury and may result in increases in fish tissue mercury.

  11. Mercury in the Pelagic Food Web of Lake Champlain

    PubMed Central

    Chen, Celia; Kamman, Neil; Shanley, James; Chalmers, Ann; Jackson, Brian; Taylor, Vivien; Smeltzer, Eric; Stangel, Pete; Shambaugh, Angela

    2013-01-01

    Lake Champlain continues to experience mercury contamination resulting in public advisories to limit human consumption of top trophic level fish such as walleye. Prior research suggested that mercury levels in biota could be modified by differences in ecosystem productivity as well as mercury loadings. We investigated relationships between mercury in different trophic levels in Lake Champlain. We measured inorganic and methyl mercury in water, seston, and two size fractions of zooplankton from 13 sites representing a range of nutrient loading conditions and productivity. Biomass varied significantly across lake segments in all measured ecosystem compartments in response to significant differences in nutrient levels. Local environmental factors such as alkalinity influenced the partitioning of mercury between water and seston. Mercury incorporation into biota was influenced by the biomass and mercury content of different ecosystem strata. Pelagic fish tissue mercury was a function of fish length and the size of the mercury pool associated with large zooplankton. We used these observations to parameterize a model of mercury transfers in the Lake Champlain food web that accounts for ecosystem productivity effects. Simulations using the mercury trophic transfer model suggest that reductions of 25 to 75% in summertime dissolved eplimnetic total mercury will likely allow fish tissue mercury concentrations to drop to the target level of 0.3 µg g−1 in a 40-cm fish in all lake segments. Changes in nutrient loading and ecosystem productivity in eutrophic segments may delay any response to reduced dissolved mercury and may result in increases in fish tissue mercury. PMID:22193540

  12. Expedition_55_Education_In-flight_Interview_with Champlain_Valley_School_District_2018_122_1620_648025

    NASA Image and Video Library

    2018-05-03

    SPACE STATION CREW MEMBERS DISCUSS LIFE IN SPACE WITH VERMONT STUDENTS------Aboard the International Space Station, Expedition 55 Flight Engineers Drew Feustel and Scott Tingle of NASA discussed life and research on the orbital laboratory during an in-flight educational event May 2 with students from the Champlain Valley School District in Hinesburg, Vermont. Tingle is in the final month of a six-month mission on the station while Feustel is in the midst of a six and a half month journey on the complex.

  13. Application of ERTS-1 imagery in the Vermont-New York dispute over pollution of Lake Champlain

    NASA Technical Reports Server (NTRS)

    Lind, A. O. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. ERTS-1 imagery and a composite map derived from ERTS-1 imagery were presented as evidence in a U.S. Supreme Court case involving the pollution of an interstate water body (Lake Champlain). A pollution problem generated by a large paper mill forms the basis of the suit (Vermont vs. International Paper Co. and State of New York) and ERTS-1 imagery shows the effluent pattern on the lake surface as extending into Vermont during three different times.

  14. Distribution of pollutants from a new paper plant in southern Lake Champlain, Vermont and New York

    USGS Publications Warehouse

    Mason, D.L.; Folger, D.W.; Haupt, R.S.; McGirr, R.R.; Hoyt, W.H.

    1977-01-01

    From November of 1973 to May of 1974, 15 arrays of sediment traps were placed along 33 km of southern Lake Champlain to sample the distribution of effluent from a large paper plant located on the western shore which had commenced operation in 1971. In the arrays located near the effluent diffuser pipeline as much as 2.3 cm of sediment accumulated, whereas elsewhere in the lake less than 1 cm accumulated. In the area of accelerated accumulation, sediments contained high concentrations of several components used in or derived from paper manufacturing. Values for kaolinite, expressed as the ratio of kaolinite to chlorite, for example, were as high as 1.4, anatase (TiO2) concentrations were as high as 0.8%, organic carbon 8.7%, and phosphorus 254 ??g/g; all were more abundant than in sediments collected in traps to the south or north. In surficial bottom sediments collected near each array organic carbon and phosphorus were also higher (4.2% and 127 ??g/g respectively) near the diffuser than elsewhere. Thus, the new plant after three years of production measurably affected the composition of suspended sediment and surficial bottom sediment despite the construction and use of extensive facilities to reduce the flow of pollutants to the lake. ?? 1977 Springer-Verlag New York Inc.

  15. A novel abutment construction technique for rapid bridge construction : controlled low strength Materials (CLSM) with full-height concrete panels.

    DOT National Transportation Integrated Search

    2012-01-01

    One of the major obstacles facing rapid bridge construction for typical span type bridges is the time required to construct bridge abutments and foundations. This can be remedied by using the controlled low strength materials (CLSM) bridge abutment. ...

  16. Geometry control of long-span continuous girder concrete bridge during construction through finite element model updating

    NASA Astrophysics Data System (ADS)

    Wu, Jie; Yan, Quan-sheng; Li, Jian; Hu, Min-yi

    2016-04-01

    In bridge construction, geometry control is critical to ensure that the final constructed bridge has the consistent shape as design. A common method is by predicting the deflections of the bridge during each construction phase through the associated finite element models. Therefore, the cambers of the bridge during different construction phases can be determined beforehand. These finite element models are mostly based on the design drawings and nominal material properties. However, the accuracy of these bridge models can be large due to significant uncertainties of the actual properties of the materials used in construction. Therefore, the predicted cambers may not be accurate to ensure agreement of bridge geometry with design, especially for long-span bridges. In this paper, an improved geometry control method is described, which incorporates finite element (FE) model updating during the construction process based on measured bridge deflections. A method based on the Kriging model and Latin hypercube sampling is proposed to perform the FE model updating due to its simplicity and efficiency. The proposed method has been applied to a long-span continuous girder concrete bridge during its construction. Results show that the method is effective in reducing construction error and ensuring the accuracy of the geometry of the final constructed bridge.

  17. The age, growth, and feeding habits of the whitefish Coregonus clupeaformis (Mitchell), of Lake Champlain

    USGS Publications Warehouse

    Van Oosten, John; Deason, Hilary J.

    1939-01-01

    This study is based on 120 whitefish collected in northern Lake Champlain (Missisquoi Bay) in 1930 and on 175 whitefish taken in southern Lake Champlain in 1931. Since the whitefish population had not been exploited commercially after 1912 in United States waters and after 1915 in Canadian waters, its study should be of interest in showing the characteristics of a population practically untouched by man. Data have been presented on length frequencies, age composition, growth, coefficient of condition, sex ratio, standard length-total length relationship, and feeding habits. The data indicated that the Missisquoi Bay population was disturbed (probably by the early fall seining of 1930) before our samples were taken so that the original length distributions no longer existed. The southern Lake Champlain material, however, showed a consistency which indicated that the population had not been exploited to any extensive degree, if at all. When the northern population was compared with the southern the former was found to differ from the latter in the following respects, which differences pointed to some disturbance of the northern stock in the lake 1. By possession of lower modes and smaller grand averages of length. 2. By absence of very old individuals. 3. By absence of a series of equally abundant age groups or, in other words, by the presence of a decided dominance of one or two age groups. 4. By a radical disagreement between the sexes in their age-frequency distribution. 5. By a disagreement between the sexes with respect to maximum lengths attained. All of the differences between the two collections could, however, not be attributed to exploitation. The following characteristics indicated the presence of two distinct populations in the lake 1. Presence of a spawning ground at each end of the lake. 2. Differences in calculated lengths and increments of length (growth rates). 3. Differences in the actual lengths and weights of corresponding age groups at capture. 4. Differences in the coefficient of condition and the length-weight relationship. The discovery of the presence of apparently two separate populations of whitefish in Lake Champlain was wholly unexpected by us.

  18. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  19. Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ding, Qing Hua

    2018-06-01

    The construction process of the CFST arch bridge is complicated. The construction process not only affects the structural stress in the installation, but also determines the form a bridge and internal force of the bridge. In this paper, a 60m span concrete filled steel tube tied arch bridge is taken as the background, and a three-dimensional finite element simulation model is established by using the MIDAS/Civil bridge structure analysis software. The elevation of the main arch ring, the beam stress, the forces in hanger rods and the modal frequency of the main arch during the construction stage are calculated, and the construction process is simulated and analyzed. Effectively and reasonably guide the construction and ensure that the line and force conditions of the completed bridge meet the design requirements and provides a reliable technical guarantee for the safe construction of the bridge.

  20. Implementation guidance for accelerated bridge construction in South Dakota

    DOT National Transportation Integrated Search

    2017-09-01

    A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...

  1. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  2. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  3. Research on evaluation and standardization of accelerated bridge construction techniques, part II.

    DOT National Transportation Integrated Search

    2015-09-01

    The Michigan Department of Transportation (MDOT) uses Accelerated bridge construction : (ABC) to reduce delays and minimize construction impacts. MDOT contracted and completed : several bridges using prefabricated bridge elements and systems (PBES). ...

  4. Research on evaluation and standardization of accelerated bridge construction techniques, part I.

    DOT National Transportation Integrated Search

    2015-09-01

    The Michigan Department of Transportation (MDOT) uses Accelerated bridge construction : (ABC) to reduce delays and minimize construction impacts. MDOT contracted and completed : several bridges using prefabricated bridge elements and systems (PBES). ...

  5. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  6. Constraints on Lake Agassiz discharge through the late-glacial Champlain Sea (St. Lawrence Lowlands, Canada) using salinity proxies and an estuarine circulation model

    USGS Publications Warehouse

    Katz, B.; Najjar, R.G.; Cronin, T.; Rayburn, J.; Mann, M.E.

    2011-01-01

    During the last deglaciation, abrupt freshwater discharge events from proglacial lakes in North America, such as glacial Lake Agassiz, are believed to have drained into the North Atlantic Ocean, causing large shifts in climate by weakening the formation of North Atlantic Deep Water and decreasing ocean heat transport to high northern latitudes. These discharges were caused by changes in lake drainage outlets, but the duration, magnitude and routing of discharge events, factors which govern the climatic response to freshwater forcing, are poorly known. Abrupt discharges, called floods, are typically assumed to last months to a year, whereas more gradual discharges, called routing events, occur over centuries. Here we use estuarine modeling to evaluate freshwater discharge from Lake Agassiz and other North American proglacial lakes into the North Atlantic Ocean through the St. Lawrence estuary around 11.5 ka BP, the onset of the Preboreal oscillation (PBO). Faunal and isotopic proxy data from the Champlain Sea, a semi-isolated, marine-brackish water body that occupied the St. Lawrence and Champlain Valleys from 13 to 9 ka, indicate salinity fell about 7-8 (range of 4-11) around 11.5 ka. Model results suggest that minimum (1600 km3) and maximum (9500 km3) estimates of plausible flood volumes determined from Lake Agassiz paleoshorelines would produce the proxy-reconstructed salinity decrease if the floods lasted <1 day to 5 months and 1 month to 2 years, respectively. In addition, Champlain Sea salinity responds very quickly to the initiation (within days) and cessation (within weeks) of flooding events. These results support the hypothesis that a glacial lake flood, rather than a sustained routing event, discharged through the St. Lawrence Estuary during the PBO. ?? 2011 Elsevier Ltd.

  7. Native rainbow smelt and nonnative alewife distribution related to temperature and light gradients in Lake Champlain

    USGS Publications Warehouse

    Parrish, Donna; Simonin, Paul W.; Rudstam, Lars G.; Sullivan, Patrick J.; Pientka, Bernard

    2012-01-01

    Alewife (Alosa pseudoharengus) recently became established in Lake Champlain and may compete with native rainbow smelt (Osmerus mordax) for food or consume larval rainbow smelt. The strength of this effect depends partly on the spatial and temporal overlap of different age groups of the two species; therefore, we need a better understanding of factors affecting alewife and rainbow smelt distributions in Lake Champlain. We used hydroacoustics, trawls, and gill nets to document vertical fish distribution, and recorded environmental data during 16 day–night surveys over two years. Temperature, temperature change, and light were all predictors of adult and age-0 rainbow smelt distribution, and temperature and light were predictors of age-0 alewives' distribution (based on GAMM models evaluated with AIC). Adult alewives were 5–30 m shallower and age-0 alewives were 2–15 m shallower than their rainbow smelt counterparts. Adult rainbow smelt distribution overlapped with age-0 rainbow smelt and age-0 alewives near the thermocline (10–25 m), whereas adult alewives were shallower (0–6 m) and overlapped with age-0 alewives and rainbow smelt in the epilimnion. Adult rainbow smelt were in water < 10–12 °C, whereas age-0 rainbow smelt were in 10–20 °C, and adult and age-0 alewives were in 15–22 °C water. Predicting these species distributions is necessary for quantifying the strength of predatory and competitive interactions between alewife and rainbow smelt, as well as between alewife and other fish species in Lake Champlain.

  8. An historical assessment of trace metal accumulation in Lake Champlain, Vermont

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mecray, E.L.; King, J.W.

    1993-03-01

    The Lake Champlain watershed, with its increased land use, shoreline development, and population, is being threatened by pollutants in the water column and bottom sediments. A comprehensive study is currently being conducted to characterize the bottom sediments of the lake for toxicity and to reconstruct the history of pollutant inputs. Surface sediment samples were collected from 30 stations and analyzed for metal (Cu, Zn, Cr, Pb, Ni, Mn, Fe, Cd, Al, and Ag) concentrations to determine the contaminated regions of the lake. Once the contaminated regions were determined, a Nemesis corer was used to retrieve sediments cores averaging 1 metermore » in length from 10 sites within Lake Champlain. Grain size and metal analyses were conducted at one and two cm intervals down the cores. Grain size data, in combination with metal and radiometric stratigraphy, can serve as an indicator of changing land use in the watershed. The grain size in some cores has a fining upward trend indicating increased land use and soil erosion. Downcore variations in metal concentrations reveal two different regimes. The concentration at depth remain consistently low and are inferred to correspond with the natural background levels. In contrast, the upper section of the cores show abrupt increases in metal concentrations which are attributed to increased anthropogenic inputs. Radiometric ([sup 210] and [sup 137]Cs) and pollen chronostratigraphy of these cores indicates that the increased metal concentrations and the changes in grain size recorded in the upper most sediments is related to increased human disturbance beginning in the late 18th and early 19th centuries. This study demonstrates that the historical record of pollution inputs to Lake Champlain can be reconstructed from the sediment sequences.« less

  9. Application of ERTS imagery to environmental studies of Lake Champlain

    NASA Technical Reports Server (NTRS)

    Lind, A. O.

    1974-01-01

    ERTS Imagery has provided data relating to a number of environmental and limnological concerns such as water quality, lake flooding and lake ice formation. Pollution plume data provided by ERTS was recently used in the Supreme Court case involving the States of Vermont and New York and a paper company. Flooding of lowland tracts has been a major concern due to a repetitive pattern of high lake levels over the past three years, and ERTS imagery is being used to construct the first series of flood maps of the affected areas. Lake ice development and turbidity patterns have also been studied from ERTS, since these have significance for shore erosion studies.

  10. Evaluation of the Buena Vista IBRD bridge : a furthering of accelerated bridge construction in Iowa.

    DOT National Transportation Integrated Search

    2012-02-01

    The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the...

  11. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Equipment and materials for constructing bridges... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges.... Equipment for use in construction of bridges or tunnels between the United States and Canada or Mexico shall...

  12. Research notes : polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs), Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. Construction of the overlays was less th...

  13. Accelerated bridge construction utilizing precast pier caps on state highway 69 over Turkey Creek, Huerfano County, CO.

    DOT National Transportation Integrated Search

    2014-07-01

    The purpose of this report is to document Accelerated Bridge Construction (ABC) techniques on IBRD : (Innovative Bridge Research and Development) project 102470 for the construction of Bridge N-16-Q : on State Highway 69 over Turkey Creek. The constr...

  14. Preservation treatment for wood bridge application

    Treesearch

    Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf

    2009-01-01

    Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...

  15. 76 FR 42545 - Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...-AA11 Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA AGENCY: Coast Guard... and surrounding the Chelsea Street Bridge (CSB) that crosses the Chelsea River between East Boston and... navigable waters during the construction of the Chelsea Street Bridge. DATES: This rule is effective in the...

  16. 76 FR 65376 - Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ...-AA11 Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA AGENCY: Coast Guard... Area (RNA) on the navigable waters of the Chelsea River under and surrounding the Chelsea Street Bridge... opportunity for public questions or comments, during the bridge construction. We will provide written...

  17. 75 FR 38923 - Regulated Navigation Area: Niantic Railroad Bridge Construction, Niantic, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ...-AA11 Regulated Navigation Area: Niantic Railroad Bridge Construction, Niantic, CT AGENCY: Coast Guard... Niantic River Channel under and surrounding the Amtrak Railroad Bridge that crosses Niantic Bay in the... on the navigable waters during the construction of the Niantic Railroad Bridge. DATES: This rule is...

  18. Elkmont Vehicle Bridge, Construction PeelAway Great Smoky Mountains National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elkmont Vehicle Bridge, Construction Peel-Away - Great Smoky Mountains National Park Roads & Bridges, Elkmont Vehicle Bridge, Spanning Little River at Elkmont Campground, Gatlinburg, Sevier County, TN

  19. Finite Element Analysis and Biomechanical Comparison of Short Posterior Spinal Instrumentation with Divergent Bridge Construct versus Parallel Tension Band Construct for Thoracolumbar Spine Fractures

    PubMed Central

    Ouellet, Jean A.; Richards, Corey; Sardar, Zeeshan M.; Giannitsios, Demetri; Noiseux, Nicholas; Strydom, Willem S.; Reindl, Rudy; Jarzem, Peter; Arlet, Vincent; Steffen, Thomas

    2013-01-01

    The ideal treatment for unstable thoracolumbar fractures remains controversial with posterior reduction and stabilization, anterior reduction and stabilization, combined posterior and anterior reduction and stabilization, and even nonoperative management advocated. Short segment posterior osteosynthesis of these fractures has less comorbidities compared with the other operative approaches but settles into kyphosis over time. Biomechanical comparison of the divergent bridge construct versus the parallel tension band construct was performed for anteriorly destabilized T11–L1 spine segments using three different models: (1) finite element analysis (FEA), (2) a synthetic model, and (3) a human cadaveric model. Outcomes measured were construct stiffness and ultimate failure load. Our objective was to determine if the divergent pedicle screw bridge construct would provide more resistance to kyphotic deforming forces. All three modalities showed greater stiffness with the divergent bridge construct. The FEA calculated a stiffness of 21.6 N/m for the tension band construct versus 34.1 N/m for the divergent bridge construct. The synthetic model resulted in a mean stiffness of 17.3 N/m for parallel tension band versus 20.6 N/m for the divergent bridge (p = 0.03), whereas the cadaveric model had an average stiffness of 15.2 N/m in the parallel tension band compared with 18.4 N/m for the divergent bridge (p = 0.02). Ultimate failure load with the cadaveric model was found to be 622 N for the divergent bridge construct versus 419 N (p = 0.15) for the parallel tension band construct. This study confirms our clinical experience that the short posterior divergent bridge construct provides greater stiffness for the management of unstable thoracolumbar fractures. PMID:24436856

  20. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    DOT National Transportation Integrated Search

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  1. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Treesearch

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  2. 77 FR 20719 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... waters of Matlacha Pass in the vicinity of the Matlacha Bridge in Matlacha, Florida. The safety zone will be enforced during construction of the Matlacha Bridge from Monday, March 12, 2012 through Tuesday...

  3. 77 FR 14276 - Regulated Navigation Area; Little Bay Bridge Construction, Little Bay, Portsmouth, NH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-AA11 Regulated Navigation Area; Little Bay Bridge Construction, Little Bay, Portsmouth, NH AGENCY... under and surrounding the Little Bay and General Sullivan Bridges in order to facilitate construction of the Little Bay Bridge between Newington, NH and Dover, NH. This temporary interim rule is necessary to...

  4. 77 FR 1870 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... waters of Matlacha Pass in the vicinity of the Matlacha Bridge in Matlacha, Florida. The safety zone will be enforced during construction of the Matlacha Bridge from Thursday, December 15, 2011 until Sunday...

  5. 76 FR 57910 - Regulated Navigation Area; Route 24 Bridge Construction, Tiverton and Portsmouth, RI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ...-AA11 Regulated Navigation Area; Route 24 Bridge Construction, Tiverton and Portsmouth, RI AGENCY: Coast... surrounding construction of the new Route 24 bridge that crosses the Sakonnet River between Tiverton and... channel beneath the bridge, speed restrictions, and suspension of all vessel traffic within the RNA during...

  6. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  7. Effects of bridge construction on songbirds and small mammals at Blennerhassett Island, Ohio River, USA.

    PubMed

    Vance, Joshua A; Angus, Norse B; Anderson, James T

    2013-09-01

    Construction of man-made objects such as roads and bridges may have impacts on wildlife depending on species or location. We investigated songbirds and small mammals along the Ohio River, WV, USA at a new bridge both before and after construction and at a bridge crossing that was present throughout the study. Comparisons were made at each site over three time periods (1985-1987 [Phase I] and 1998-2000 [Phase II] [pre-construction], 2007-2009 [Phase III] [post-construction]) and at three distances (0, 100, 300 m) from the bridge or proposed bridge location. Overall, 70 songbirds and 10 small mammals were detected during the study. Cliff swallows (Petrochelidon pyrrhonota) and rock pigeons (Columba livia) showed high affinity for bridges (P < 0.05). Combined small mammal abundances increased between Phases I and II (P < 0.05), but did not differ between Phases II and III (P > 0.05). Species richness and diversity for songbirds and small mammals did not differ before and after bridge construction (P > 0.05). We found that most species sampled did not respond to the bridge crossing, and believe that the bridge is not causing any measurable negative density impacts to the species we investigated. The new bridge does provide habitat for exotic rock pigeons that are adjusted to man-made structures for nesting.

  8. Astronaut Alan Shepard - U.S.S. Champlain - Post-Recovery Mercury Capsule

    NASA Image and Video Library

    1961-05-05

    S61-02727 (5 May 1961) --- Astronaut Alan B. Shepard is seen on the deck of the USS Lake Champlain after the recovery of his Mercury capsule in the western Atlantic Ocean. Shepard and the Mercury spacecraft designated the ?Freedom 7? were flown to the deck of the recovery ship within 11 minutes of splashdown. MR-3 was the United States? first manned space mission. The spacecraft attained a maximum speed of 5,180 miles per hour, reached an altitude of 116 1/2 statute miles, and landed 302 statute miles downrange from Cape Canaveral, Florida. The suborbital mission lasted 15 minutes and 22 seconds. Photo credit: NASA or National Aeronautics and Space Administration

  9. Seismic response of precast segmental bridge superstructures.

    DOT National Transportation Integrated Search

    2006-12-01

    Precast segmental construction of bridges can accelerate construction and minimize the cost of bridges in highly congested urban environments and environmentally sensitive regions. Despite their proven benefits, the use of precast segmental bridges i...

  10. 35. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Bridge under construction, 1925-27. Photo from S side of W approach. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1927. Copied by Sarcone Photography, columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  11. 12. Photocopy of bridge construction phonograph (from the collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of bridge construction phonograph (from the collection of Phil Bolmie, 17540 County Road 28, Colfax, North Dakota 58018; 701 553-8705) photographer unknown, 1917 views showing bridge under construction - Enloe Bridge No. 90021, Spanning Red River of North between Minnesota & North Dakota on County State Aid Highway 28, Wolverton, Wilkin County, MN

  12. 78 FR 37969 - Safety Zone; South Park Bridge Construction, Lower Duwamish Waterway, Seattle, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ...-AA00 Safety Zone; South Park Bridge Construction, Lower Duwamish Waterway, Seattle, WA AGENCY: Coast... zone in the lower Duwamish Waterway around the South Park Bridge in Seattle, Washington for the re-construction of the bridge. The safety zone is necessary to ensure the safety of the maritime public and...

  13. 77 FR 70891 - Safety Zone; Bay Bridge Construction, San Francisco Bay, San Francisco, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ...-AA00 Safety Zone; Bay Bridge Construction, San Francisco Bay, San Francisco, CA AGENCY: Coast Guard... the navigable waters of the San Francisco Bay near Yerba Buena Island, CA in support of the Bay Bridge... construction of the Bay Bridge, the safety zone is necessary to provide for the safety of mariners transiting...

  14. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  15. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  16. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  17. Implementation Guidance for Accelerated Bridge Construction in South Dakota : Research Brief

    DOT National Transportation Integrated Search

    2017-09-01

    Investigate typical accelerated bridge construction methods and their applicability in South Dakota. A study was conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. The main objective of this study wa...

  18. New estimates of lethality of sea lamprey (Petromyzon marinus) attacks on lake trout (Salvelinus namaycush): Implications for fisheries management

    USGS Publications Warehouse

    Madenjian, C.P.; Chipman, B.D.; Marsden, J.E.

    2008-01-01

    Sea lamprey (Petromyzon marinus) control in North America costs millions of dollars each year, and control measures are guided by assessment of lamprey-induced damage to fisheries. The favored prey of sea lamprey in freshwater ecosystems has been lake trout (Salvelinus namaycush). A key parameter in assessing sea lamprey damage, as well as managing lake trout fisheries, is the probability of an adult lake trout surviving a lamprey attack. The conventional value for this parameter has been 0.55, based on laboratory experiments. In contrast, based on catch curve analysis, mark-recapture techniques, and observed wounding rates, we estimated that adult lake trout in Lake Champlain have a 0.74 probability of surviving a lamprey attack. Although sea lamprey growth in Lake Champlain was lower than that observed in Lake Huron, application of an individual-based model to both lakes indicated that the probability of surviving an attack in Lake Champlain was only 1.1 times higher than that in Lake Huron. Thus, we estimated that lake trout survive a lamprey attack in Lake Huron with a probability of 0.66. Therefore, our results suggested that lethality of a sea lamprey attack on lake trout has been overestimated in previous model applications used in fisheries management. ?? 2008 NRC.

  19. High-water marks from flooding in Lake Champlain from April through June 2011 and Tropical Storm Irene in August 2011 in Vermont

    USGS Publications Warehouse

    Medalie, Laura; Olson, S.A.

    2013-01-01

    The U.S. Geological Survey, in cooperation with the Federal Emergency Management Agency, identified high-water marks after two floods in Vermont during 2011. Following a snowy winter, new monthly precipitation records were set in Burlington, Vermont, in April and May 2011, causing extensive flooding from April through June. The spring 2011 flooding resulted in a new record for stage (103.27 feet, referenced to the National Geodetic Vertical Datum of 1929) at the Lake Champlain at Burlington, Vt., gaging station (04294500). During August 28 and 29, 2011, tropical storm Irene delivered rainfall totals of 3 to more than 7 inches throughout Vermont, which resulted in extensive flooding and new streamflow records at nine streamgaging stations. Four presidential declarations of disaster were made following the 2011 flood events in Vermont. Thirty-nine high-water marks were identified and flagged to mark the highest levels of Lake Champlain from the May 2011 flooding, and 1,138 high-water marks were identified and flagged along Vermont rivers after flooding from tropical storm Irene in August 2011. Seventy-four percent of the high-water marks that were flagged were later found and surveyed to the North American Vertical Datum of 1988.

  20. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  1. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  2. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Equipment and materials for constructing bridges... bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials. Equipment for use in construction of bridges or tunnels between the United States and Canada or...

  3. Building Adaptive Capacity with the Delphi Method and Mediated Modeling for Water Quality and Climate Change Adaptation in Lake Champlain Basin

    NASA Astrophysics Data System (ADS)

    Coleman, S.; Hurley, S.; Koliba, C.; Zia, A.; Exler, S.

    2014-12-01

    Eutrophication and nutrient pollution of surface waters occur within complex governance, social, hydrologic and biophysical basin contexts. The pervasive and perennial nutrient pollution in Lake Champlain Basin, despite decades of efforts, exemplifies problems found across the world's surface waters. Stakeholders with diverse values, interests, and forms of explicit and tacit knowledge determine water quality impacts through land use, agricultural and water resource decisions. Uncertainty, ambiguity and dynamic feedback further complicate the ability to promote the continual provision of water quality and ecosystem services. Adaptive management of water resources and land use requires mechanisms to allow for learning and integration of new information over time. The transdisciplinary Research on Adaptation to Climate Change (RACC) team is working to build regional adaptive capacity in Lake Champlain Basin while studying and integrating governance, land use, hydrological, and biophysical systems to evaluate implications for adaptive management. The RACC team has engaged stakeholders through mediated modeling workshops, online forums, surveys, focus groups and interviews. In March 2014, CSS2CC.org, an interactive online forum to source and identify adaptive interventions from a group of stakeholders across sectors was launched. The forum, based on the Delphi Method, brings forward the collective wisdom of stakeholders and experts to identify potential interventions and governance designs in response to scientific uncertainty and ambiguity surrounding the effectiveness of any strategy, climate change impacts, and the social and natural systems governing water quality and eutrophication. A Mediated Modeling Workshop followed the forum in May 2014, where participants refined and identified plausible interventions under different governance, policy and resource scenarios. Results from the online forum and workshop can identify emerging consensus across scales and sectors and be simulated in adaptation scenarios within integrated models. Comparing interventions and scenarios to existing and planned policy and governance systems in Lake Champlain Basin allows for new feedback to build adaptive capacity to identify key leverage points in the coupled natural and human system.

  4. Implementation of sustainability in bridge design, construction and maintenance.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  5. Analysis of the state of the art of precast concrete bridge substructure systems.

    DOT National Transportation Integrated Search

    2013-10-01

    Precasting of bridge substructure components holds potential for accelerating the construction of bridges,reducing : impacts to the traveling public on routes adjacent to construction sites, improving bridge durability and hence service : life, and r...

  6. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  7. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Treesearch

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  8. Study on Construction Technology of Municipal Road and Bridge Concrete

    NASA Astrophysics Data System (ADS)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  9. Construction of a Virginia short-span bridge with the Strongwell 36-inch double-web I-beam.

    DOT National Transportation Integrated Search

    2005-01-01

    The Route 601 Bridge in Sugar Grove, VA, spans 39 ft over Dickey Creek. The bridge is the first to use the Strongwell 36-in-deep fiber-reinforced polymer (FRP) double-web beam (DWB) in a vehicular bridge superstructure. Construction of the new bridge...

  10. 77 FR 43557 - Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... during the Gilmerton Bridge Center Span Float- in and bridge construction of span placement. This action... Construction, INC will facilitate removal of the existing bascule spans from the Gilmerton Bridge, transport of...

  11. Implementation of sustainable and green design and construction practices for bridges.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  12. Finite element analysis of the Wolf Creek multispan curved girder bridge.

    DOT National Transportation Integrated Search

    2008-01-01

    The use of curved girder bridges in highway construction has grown steadily during the last 40 years. Today, roughly 25% of newly constructed bridges have a curved alignment. Curved girder bridges have numerous complicating geometric features that di...

  13. Design, construction, and field testing of an ultra high performance concrete pi-girder bridge.

    DOT National Transportation Integrated Search

    2011-01-01

    The Jakway Park Bridge in Buchanan County, Iowa is the first bridge constructed with a new prestesssed girder system composed of : precast Ultra-High Performance Concrete (UHPC). These girders employ an integral deck to facilitate construction and ar...

  14. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck

    PubMed Central

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-01-01

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks. PMID:28208773

  15. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck.

    PubMed

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-02-09

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks.

  16. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Treesearch

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  17. Polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs) and Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. : Several problems were encountered duri...

  18. Development of a precast bridge deck overhang system for the rock creek bridge.

    DOT National Transportation Integrated Search

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  19. Effect of voids in grouted, post-tensioned concrete bridge construction : seminar slides.

    DOT National Transportation Integrated Search

    2009-02-26

    Post-tensioned (PT) bridges have several advantages over other bridge types: they can span longer distances, can be constructed relatively fast, and are economical. The tendons of PT bridges are critical components, essentially the backbone of the PT...

  20. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  1. UNIDENTIFIED CATENARY SUSPENSION BRIDGE, SHOWING RIVETED METAL PIERS UNDER CONSTRUCTION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    UNIDENTIFIED CATENARY SUSPENSION BRIDGE, SHOWING RIVETED METAL PIERS UNDER CONSTRUCTION. NOTE APPROACH SPANS OF PIPE CONSTRUCTION IN RIGHT BACKGROUND. 3/4 VIEW FROM BELOW. - Clear Fork of Brazos River Suspension Bridge, Spanning Clear Fork of Brazos River at County Route 179, Albany, Shackelford County, TX

  2. Research on Swivel Construction Technology of 22,400 Tons in Zoucheng Thirty Meter Bridge

    NASA Astrophysics Data System (ADS)

    Han, Jun; Benlin, Xiao

    2018-05-01

    In recent years, with the rapid development of highways and railways in our country, there have been many new bridges that need to cross the existing routes. If the conventional construction methods are used, the existing traffic will be affected and the traffic will be built above the busy traffic lines, so there is a big security risk, the construction methods must be improved and innovated. In this paper, it intends to research and develop some key technologies of swivel construction. According to the construction features to use finite element method of swivel cable-stayed bridge to analyse the cable-stayed bridge . The swivel construction process is carried out to solve the technical problems and difficulties in the construction.

  3. Field performance of timber bridges. 14, Dean, Hibbsville, and Decatur stress-laminated deck bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; S. Golston; K. Hinds

    1984-01-01

    The Dean, Hibbsville, and Decatur bridges were constructed in southern Iowa during 1994. Each bridge is a simple-span, stress-laminated deck superstructure, approximately 7.3 m (24 ft) long, constructed from eastern cottonwood lumber. The performance of each bridge was monitored for approximately 2 years, beginning shortly after installation. Monitoring involved...

  4. Laboratory testing and finite element modeling of precast bridge deck panel transverse connections.

    DOT National Transportation Integrated Search

    2010-08-06

    Precast bridge deck panels are increasingly used to reduce construction times and associated traffic delays as part of many DOTs push for accelerated bridge construction. They allow a bridge deck to be built or replaced in days instead of months. ...

  5. M324 : investigation of closure pour elimination for phased construction of steel girder bridges.

    DOT National Transportation Integrated Search

    2014-10-01

    Phased construction is a common practice used by State DOTs during the : replacement of a bridge. This method allows for the traffic flow to be maintained on half : of the bridge while a new deck is constructed on the other half. For steel girder bri...

  6. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 2--inspection, repair, materials, and risks.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and : constructed because they are economical for spanning long distances. In Texas, there are several signature PT : bridges. In the late 199...

  7. Construction simulation analysis of 120m continuous rigid frame bridge based on Midas Civil

    NASA Astrophysics Data System (ADS)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-03-01

    In this paper, a three-dimensional finite element model of a continuous rigid frame bridge with a main span of 120m is established by the simulation and analysis of Midas Civil software. The deflection and stress of the main beam in each construction stage of continuous beam bridge are simulated and analyzed, which provides a reliable technical guarantee for the safe construction of the bridge.

  8. 20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  9. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred : because of construction loadings, which are an underemphasized : topic in many specifications and design : manuals. Bridge girders are least stable during the : construction phase, so it is impor...

  10. Land use and flow regime effects on phosphorus chemical dynamics in the fluvial sediment of the Winooski River, Vermont

    USGS Publications Warehouse

    McDowell, R.W.; Sharpley, A.N.; Chalmers, A.T.

    2002-01-01

    In the last century, fourfold increase in phosphorus (P) loadings to Lake Champlain, Vermont (VT), USA, have led to nuisance levels of algal growth occurring more often. To better understand the transport, storage, and cycling of P within the lake's catchment, we examined the chemistry, bioavailability and processes controlling sediment P release to waters of the Winooski River, VT, the largest tributary to Lake Champlain. Iron-oxide strip P (algal-bioavailable P) of the river sediments adjacent to agricultural land (3.6 mg kg-1) was greater (P < 0.05) than adjacent to forested land (2.4 mg kg-1). When compared among flow regimes, impoundment (731 mg kg-1) and reservoir sediments (803 mg kg-1) had greater total P concentrations than river sediment (462 mg kg-1). This was attributed to more fines (< 63 ??m) in impoundments and reservoirs (64%) than in river sediments (33%), which also decreased the ability of impoundment sediments to release P to solution and thereby be a sink for P. Although land use and flow regime influenced whether Winooski River sediments acted as a sink or source of P to Lake Champlain, long-term remedial strategies for the catchment should continue to focus on decreasing P losses in agricultural and urban runoff. ?? 2002 Elsevier Science B.V. All rights reserved.

  11. Concentration and flux of total and dissolved phosphorus, total nitrogen, chloride, and total suspended solids for monitored tributaries of Lake Champlain, 1990-2012

    USGS Publications Warehouse

    Medalie, Laura

    2014-01-01

    Annual and daily concentrations and fluxes of total and dissolved phosphorus, total nitrogen, chloride, and total suspended solids were estimated for 18 monitored tributaries to Lake Champlain by using the Weighted Regressions on Time, Discharge, and Seasons regression model. Estimates were made for 21 or 23 years, depending on data availability, for the purpose of providing timely and accessible summary reports as stipulated in the 2010 update to the Lake Champlain “Opportunities for Action” management plan. Estimates of concentration and flux were provided for each tributary based on (1) observed daily discharges and (2) a flow-normalizing procedure, which removed the random fluctuations of climate-related variability. The flux bias statistic, an indicator of the ability of the Weighted Regressions on Time, Discharge, and Season regression models to provide accurate representations of flux, showed acceptable bias (less than ±10 percent) for 68 out of 72 models for total and dissolved phosphorus, total nitrogen, and chloride. Six out of 18 models for total suspended solids had moderate bias (between 10 and 30 percent), an expected result given the frequently nonlinear relation between total suspended solids and discharge. One model for total suspended solids with a very high bias was influenced by a single extreme value; however, removal of that value, although reducing the bias substantially, had little effect on annual fluxes.

  12. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, and evaluation of a precast concrete bridge, Black Hawk County.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBI...

  13. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  14. 77 FR 1407 - Regulated Navigation Area; Memorial Bridge Construction, Piscataqua River, Portsmouth, NH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ...-AA11 Regulated Navigation Area; Memorial Bridge Construction, Piscataqua River, Portsmouth, NH AGENCY... River under and surrounding the Memorial Bridge between Portsmouth, NH and Kittery, ME. This temporary interim rule is necessary to provide for the safety of life on the navigable waters during bridge...

  15. 77 FR 15009 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... zones to remain in effect throughout the duration of the construction and renewal of the Sellwood Bridge... safe distance from the construction area while transiting in the vicinity of the Sellwood Bridge...

  16. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  17. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred because of construction loadings, which are an underemphasized topic in many specifications and design manuals. Bridge girders are least stable during the construction phase, so it is important for...

  18. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Treesearch

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  19. Compilation of accelerated bridge construction (ABC) bridges : final report.

    DOT National Transportation Integrated Search

    2016-01-01

    Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in : isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a : comprehensiv...

  20. TOPOGRAPHIC VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TOPOGRAPHIC VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO SOUTHEAST. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  1. ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO NORTH. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  2. Accelerating bridge construction to minimize traffic disruption : research spotlight.

    DOT National Transportation Integrated Search

    2013-12-01

    Since 2008, MDOT has been using accelerated bridge construction, which utilizes prefabricated components and structural placements, to minimize traffic disruptions during bridge replacement or rehabilitation. A recent project provided MDOT with a new...

  3. 78 FR 55337 - Buy America Waiver Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... components for construction of Monon Trail Bridge over SR 25 in Indiana. DATES: The effective date of the... bridge components for construction of Monon Trail Bridge over SR 25 in Indiana. The Indiana Department of Transportation (INDOT) requested this waiver for an overpass to carry the Monon High Bridge Trail across the new...

  4. 78 FR 59237 - Regulated Navigation Area-Weymouth Fore River, Fore River Bridge Construction, Weymouth and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ...-AA11 Regulated Navigation Area--Weymouth Fore River, Fore River Bridge Construction, Weymouth and... vicinity of the Fore River Bridge (Mile 3.5) between Weymouth and Quincy, MA. This rule will place temporary speed, wake, and entry restrictions on vessels during bridge replacement operations. This rule is...

  5. 78 FR 59231 - Regulated Navigation Area-Tappan Zee Bridge Construction Project, Hudson River; South Nyack and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... 1625-AA11 Regulated Navigation Area--Tappan Zee Bridge Construction Project, Hudson River; South Nyack... Hudson River surrounding the Tappan Zee Bridge. This temporary interim rule allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...

  6. 78 FR 53668 - Regulated Navigation Area; Maine Kennebec Bridge Construction Zone, Kennebec River, Richmond, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ...-AA11 Regulated Navigation Area; Maine Kennebec Bridge Construction Zone, Kennebec River, Richmond, ME... surrounding the Maine Kennebec Bridge between Richmond, ME, and Dresden, ME. This RNA allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...

  7. 78 FR 71546 - Safety Zone; Belt Parkway Bridge Construction, Gerritsen Inlet, Brooklyn, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... 1625-AA00 Safety Zone; Belt Parkway Bridge Construction, Gerritsen Inlet, Brooklyn, NY AGENCY: Coast... safety zone on the navigable waters of Gerritsen Inlet surrounding the Belt Parkway Bridge. This proposed rule would allow the Coast Guard to prohibit all vessel traffic through the safety zone during bridge...

  8. 78 FR 12260 - Regulated Navigation Area-Weymouth Fore River, Fore River Bridge Construction, Weymouth and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...-AA11 Regulated Navigation Area--Weymouth Fore River, Fore River Bridge Construction, Weymouth and... under and surrounding the Fore River Bridge (Mile 3.5) between Weymouth and Quincy, MA until December 31... prohibit all vessel traffic through the RNA during bridge replacement operations, both planned and...

  9. Phase and widening construction of steel bridges.

    DOT National Transportation Integrated Search

    2014-03-01

    Phase construction is used to maintain traffic without interruption and generally refers to sequenced construction where a portion of the bridge is under construction while the remainder continues to carry traffic. The method typically results in two...

  10. 37. MISSISSIPPI, LOWNDES CO. COLUMBUS BRIDGE, CONSTRUCTION End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. MISSISSIPPI, LOWNDES CO. COLUMBUS BRIDGE, CONSTRUCTION End of Main St., Columbus Overhead view of round, swing pier, showing steel reinforcing rods, workmen. During construction, 1925-27. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1926. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  11. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  12. Durability assessment of prefabricated bridge elements and systems : [research summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Many states have instituted Prefabricated Bridge Elements and Systems : (PBES) and Accelerated Bridge Construction (ABC) projects to decrease : onsite construction time, work zone and user costs, and increase safety : factors; however, the quality an...

  13. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO NORTH ON WEST SIDE. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  14. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  15. Construction of crack-free bridge decks : technical summary.

    DOT National Transportation Integrated Search

    2017-04-01

    The report documents the performance of the decks based on crack surveys performed on the LC-HPC decks and : matching control bridge decks. The specifications for LC-HPC bridge decks, which cover aggregates, concrete, : and construction procedures, a...

  16. Object Markers at Narrow Bridges on Low Volume Rural Roadways

    DOT National Transportation Integrated Search

    1998-09-01

    Bridges are a necessary part of any roadway system. Their construction requires a more sophisticated engineering design analysis and a higher construction cost than that for the roadways connecting them. Until relatively recently, bridge width on low...

  17. Development of a precast bridge deck overhang system

    DOT National Transportation Integrated Search

    2011-02-01

    Prestressed-precast panels are commonly used at interior beams for bridge decks in Texas. The use of these panels can provide ease : of construction, sufficient capacity, and good economy for the construction of bridge decks in Texas. Current practic...

  18. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  19. 34. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Date: 1925-27. Old bridge in background. Photo taken from such (probably east) bank. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1927. Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  20. Characterization of water-quality and bed-sediment conditions in Currituck Sound, North Carolina, prior to the Mid-Currituck Bridge construction, 2011–15

    USGS Publications Warehouse

    Wagner, Chad R.; Fitzgerald, Sharon; Antolino, Dominick J.

    2015-12-24

    The characterization of water-quality and bed-sediment chemistry in Currituck Sound along the proposed alignment of the Mid-Currituck Bridge summarized herein provides a baseline for determining the effect of bridge construction and bridge deck runoff on environmental conditions in Currituck Sound.

  1. 76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...

  2. Determination of brace forces caused by construction loads and wind loads during bridge construction.

    DOT National Transportation Integrated Search

    2014-04-01

    The first objective of this study was to develop procedures for determining bracing forces during bridge construction. : Numerical finite element models and analysis techniques were developed for evaluating brace forces induced by construction loads ...

  3. Toward Successful Implementation of Prefabricated Deck Panels to Accelerate the Bridge Construction Process

    DOT National Transportation Integrated Search

    2016-08-01

    The development of accelerated bridge construction (ABC) techniques and connection details has become a national research focus. With the aging of the interstate system and many bridges on key routes requiring extensive rehabilitation or replacement,...

  4. 34. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of original construction plan (Wabasha Street Bridge, Cantilever Span 1888); web details of cantilever arm connecting first span to first pier - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  5. 33 CFR 117.993 - Lake Champlain.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) A sufficient number of infrared cameras shall be maintained in good working order at all times with... infrared cameras to verify that the channel is clear of all approaching vessel traffic. All approaching...

  6. 33 CFR 117.993 - Lake Champlain.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) A sufficient number of infrared cameras shall be maintained in good working order at all times with... infrared cameras to verify that the channel is clear of all approaching vessel traffic. All approaching...

  7. Structural Impact of Construction Loads

    DOT National Transportation Integrated Search

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  8. Structural Impact of Construction Loads

    DOT National Transportation Integrated Search

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to con...

  9. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  10. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  11. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  12. Comparison of properties of fresh and hardened concrete in bridge decks.

    DOT National Transportation Integrated Search

    1971-01-01

    A study was made on 17 bridge decks constructed in 1963 under regular construction procedures. The purpose was (1) to compare important properties of concrete as freshly placed in randomly selected bridge decks with those after hardening of the concr...

  13. 48. Photographic copy of original construction plan (Wabasha St. Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photographic copy of original construction plan (Wabasha St. Bridge, Plan of Masonry for Abutment, Piers No. 1 and 3, 1888); North abutment, first and second piers - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  14. 38. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction plan (Wabasha Street Bridge, Detail of South Cantilever Arm, 1888); web details of cantilever arm connecting second pier to third span - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  15. ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW OF NORTH ARCH FOLLOWING REMOVAL OF TRAVELING FORMWORK, VIEW TO EAST. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  16. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW OF SOUTH TRAVELING FORMWORK AND NORTH ARCH PRIOR TO CLOSURE POUR. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  17. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO SOUTH OF SOUTHERN TRAVELING FORMWORK AND CABLE STAY TOWER. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  18. In-service performance monitoring of a CFRP reinforced HPC bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The Rollins Road Bridge in Rollinsford, New Hampshire was constructed in part with funding from the FHWAs Innovative Bridge Research and Construction (IBRC) program and opened to traffic in December, 2000. A requirement of the IBRC program is the ...

  19. 32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Center and east pier, with framing, during construction, 1925-27. Makes panorama with next photo. Note steam crane on framing. Credit: Shenks Photography, Columbus, MS, owner. O. Pruitt, photographer. Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  20. Interactions between hatch dates, growth rates, and mortality of Age-0 native Rainbow Smelt and nonnative Alewife in Lake Champlain

    USGS Publications Warehouse

    Parrish, Donna; Simonin, Paul W.; Rudstam, Lars G.; Pientka, Bernard; Sullivan, Patrick J.

    2016-01-01

    Timing of hatch in fish populations can be critical for first-year survival and, therefore, year-class strength and subsequent species interactions. We compared hatch timing, growth rates, and subsequent mortality of age-0 Rainbow Smelt Osmerus mordax and Alewife Alosa pseudoharengus, two common open-water fish species of northern North America. In our study site, Lake Champlain, Rainbow Smelt hatched (beginning May 26) almost a month earlier than Alewives (June 20). Abundance in the sampling area was highest in July for age-0 Rainbow Smelt and August for age-0 Alewives. Late-hatching individuals of both species grew faster than those hatching earlier (0.6 mm/d versus 0.4 for Rainbow Smelt; 0.7 mm/d versus 0.6 for Alewives). Mean mortality rate during the first 45 d of life was 3.4%/d for age-0 Rainbow Smelt and was 5.5%/d for age-0 Alewives. Alewife mortality rates did not differ with hatch timing but daily mortality rates of Rainbow Smelt were highest for early-hatching fish. Cannibalism is probably the primary mortality source for age-0 Rainbow Smelt in this lake. Therefore, hatching earlier may not be advantageous because the overlap of adult and age-0 Rainbow Smelt is highest earlier in the season. However, Alewives, first documented in Lake Champlain in 2003, may increase the mortality of age-0 Rainbow Smelt in the summer, which should favor selection for earlier hatching.

  1. Improving bridges with prefabricated precast concrete systems.

    DOT National Transportation Integrated Search

    2013-12-01

    In order to minimize the impact of construction on the traveling public, MDOT utilizes innovative and specialized construction methods such as Accelerated Bridge Construction (ABC). Michigan, like other highway agencies in the region, has several cha...

  2. Evaluating Louisiana new deck continuity detail for precast prestressed concrete girder bridges : research project capsule.

    DOT National Transportation Integrated Search

    2014-08-01

    The goal of everyone in the transportation community is to build bridges : that are economic, easy to construct, and durable. Therefore, accelerating : bridge construction through the use of precast concrete or prefabricated : steel girders is a comm...

  3. Research on construction technology for orthotropic steel deck pavement of Haihe River Chunyi Bridge

    NASA Astrophysics Data System (ADS)

    Xue, Y. C.; Qian, Z. D.; Zhang, M.

    2017-01-01

    In order to ensure the good service quality of orthotropic steel deck pavement of Haihe River Chunyi Bridge in Tianjin, and to reduce the occurrence of pavement diseases like lateral and longitudinal cracks, the key working procedures such as steel deck cleaning, anticorrosive coating, bonding layer spraying, seam cutting, epoxy asphalt concrete’s mixing, transportation, paving and compaction were studied. The study was based on the main features of epoxy asphalt concrete which is the pavement materials of Haihe River Chunyi Bridge, and combined with the basic characteristics and construction conditions of Haihe River Chunyi Bridge. Furthermore, some processing measures like controlling time and temperature, continuous paving with two pavers, lateral feeding, and improving the compaction method were proposed. The project example shows that the processing measures can effectively solve the technical difficulties in the construction of orthotropic steel deck pavement of Haihe River Chunyi Bridge, can greatly improve the construction speed and quality, and can provide reference for the same kinds of orthotropic steel deck pavement construction.

  4. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Treesearch

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  5. Study on the use of self-consolidating concrete on the Interstate 25 bridge replacement in Trinidad, CO.

    DOT National Transportation Integrated Search

    2010-12-01

    As part of a national experiment sponsored by the FHWA under the Innovative Bridge Research and Construction (IBRC) : program, CDOT used self-consolidating concrete (SCC) to construct abutments, piers, and retaining walls on a bridge : replacement pr...

  6. Long-term behavior of integral abutment bridges : appendix B, SR18 over the Mississinewa River Bridge soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  7. Long-term behavior of integral abutment bridges : appendix E, INDOT design manual : selected recommendations for integral abutment bridges.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  8. Design, installation, and condition assessment of a concrete bridge deck constructed with ASTM A1035 CS no. 4 bars.

    DOT National Transportation Integrated Search

    2017-06-01

    Recently developed corrosion-resistant reinforcing structural design guidelines were used to design, construct, and : assess a reinforced concrete bridge deck with high-strength ASTM A1035 CS steel bars. The bridge replacement is located : along the ...

  9. Precast concrete elements for accelerated bridge construction : laboratory testing of precast substructure components, Boone County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    Vol. 1-1: In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure : elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth dec...

  10. 9 CFR 93.403 - Ports designated for the importation of ruminants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the importation of ruminants. (a) Air and ocean ports. The following ports have APHIS inspection..., and Champlain, New York; Dunseith, Pembina, and Portal, North Dakota; Derby Line and Highgate Springs...

  11. 9 CFR 93.203 - Ports designated for the importation of poultry.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the importation of poultry. (a) Air and ocean ports. The following ports have APHIS inspection and..., and Champlain, New York; Dunseith, Pembina, and Portal, North Dakota; Derby Line and Highgate Springs...

  12. Construction of prestressed concrete single-tee bridge superstructures.

    DOT National Transportation Integrated Search

    1977-01-01

    This report discusses in detail the construction of the first five precast, prestressed concrete, single-tee beam bridge superstructures to be let to contract in Virginia. The data suggest that this single-tee beam enables efficient construction of t...

  13. Review on antibacterial characteristics of bridge engineering biomaterials.

    PubMed

    Zhao, Qing-Qing; Chen, Meng-Yao; He, Rui-Lin; Zhang, Zhong-Feng; Ashraf, Muhammad Aqeel

    2016-01-01

    This review summarizes the research on timber construction materials used in bridge construction. It focuses on the application of antiseptic treatments and the use of timber engineering materials in decks and bridges. This review also provides an overview on the future research and prospects of engineered timber materials.

  14. Monitoring system of arch bridge for safety network management

    NASA Astrophysics Data System (ADS)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  15. Vibration analysis of the Second Saikai Bridge—a concrete filled tubular (CFT) arch bridge

    NASA Astrophysics Data System (ADS)

    Yoshimura, Mistuhiro; Wu, Qingxiong; Takahashi, Kazuo; Nakamura, Shozo; Furukawa, Kazuyoshi

    2006-02-01

    Concrete-filled steel tubular (CFT) arch bridges have been rapidly developing in China since 1990. Research has focused on the static behavior, thermal stress and erection technique, however, and there has been very little research of natural vibrations and dynamic responses of these bridges. Japan's first CFT arch bridge in highway bridges, the Second Saikai Bridge, is now under construction in Nagasaki Prefecture. Furthermore, this bridge has a pedestrian bridge that is suspended under the girder, which is rare. Therefore, the natural vibration properties are examined, and the influence of pedestrian bridge structure on the natural vibration of main bridge is discussed first. Response analysis under a moving vehicle and pedestrian is carried out, and the response characteristics and response level are clarified. The natural vibrations and responses are compared to those of CFT arch bridges that have been constructed in China. Results show the fine performance of both main bridge and pedestrian bridge of the Second Saikai Bridge.

  16. Long-term behavior of integral abutment bridges : appendix A, construction plans.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  17. Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation

    NASA Astrophysics Data System (ADS)

    Shang, Yanliang; Shi, Wenjun; Han, Tongyin; Qin, Zhichao; Du, Shouji

    2017-10-01

    The shield method has many advantages in the construction of urban subway, and has become the preferred method for the construction of urban subway tunnel. Taking Shijiazhuang metro line 3 (administrative center station - garden park station interval) Passing alongside bridge as the engineering background, double shield crossing the bridge pile foundation model was set up. The deformation and internal force of the pile foundation during the construction of the shield were analyzed. Pile stress caused by shield construction increases, but the maximum stress is less than the design strength; the maximum surface settlement caused by the construction of 10.2 mm, the results meet the requirements of construction.

  18. 1857 PatentExtant Construction Comparison Powerscourt Bridge, Spanning Chateauguay River, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1857 Patent-Extant Construction Comparison - Powerscourt Bridge, Spanning Chateauguay River, First Concession Road, Elgin/Hichinbrooke, Huntingdon County, Quebec, Canada, Chateaugay, Franklin County, NY

  19. Working with Farmers to Reduce Phosphorus in Lake Champlain

    EPA Pesticide Factsheets

    EPA researchers are working with Vermont small dairy farmers to explore whether pasture-based rotational grazing can be a viable, cost-effective, option for small farms to help to reduce phosphorus loadings to the lake.

  20. Missisquoi Bay Phosphorus Model Addendum

    EPA Pesticide Factsheets

    This technical memorandum provides results of an extended load reduction simulation. The memorandum serves as an addendum to the main Missisquoi Bay Phosphorus Mass Balance Model report prepared for the Lake Champlain Basin Program by LimnoTech in 2012

  1. New England from Boston to Lake Champlain and up to southern Main from STS-58

    NASA Image and Video Library

    1993-10-30

    STS058-105-016 (18 Oct-1 Nov 1993) --- This photograph includes much of the heart of New England, stretching from Boston and Boston Harbor (lower left) across New Hampshire and Vermont to Lake Champlain (upper left), and up to southern Maine (Portland is just off the photo at right center). The colors in this photograph are less vivid than those in STS-58-81-038, because the color changes on the deciduous trees in central and northern New England were past their peak when this photograph was taken. North of Boston flows the Merrimack River (which forms part of the state boundary between Massachusetts and New Hampshire). It is delineated by the small industrial towns (Concord, Manchester, Nashua, Lowell) which grew up on its banks. The White Mountains of New Hampshire are seen near the center, and Mt. Washington (6,288 feet) is capped with snow.

  2. Caisson disease during the construction of the Eads and Brooklyn Bridges: A review.

    PubMed

    Butler, W P

    2004-01-01

    The Eads Bridge (St. Louis) and the Brooklyn Bridge (New York City) were testing grounds for caisson construction. These caissons were enormous compressed air boxes used to build riverine piers and abutments anchoring the bridges. Caisson meant faster and cheaper construction, but there was a hidden cost---caisson disease (decompression sickness). Within caissons, workers labored at pressures as high as 55 psig and caisson disease was common. This discourse is a brief history of the caisson, a brief discussion of the illness as viewed in the mid 1800's, and an abbreviated history of the Eads and Brooklyn Bridges. It also provides a detailed description and evaluation of the observations, countermeasures, and recommendations of Dr. Alphonse Jaminet, the Eads Bridge physician, and Dr. Andrew Smith, the Brooklyn Bridge physician, who published reports of their experience in 1871 and 1873, respectively. These and other primary sources permit a detailed examination of early caisson disease and Jaminet's and Smith's thinking also serve as good examples from which to study and learn.

  3. Evaluation of grit-impregnated, epoxy coated prestressing strand on South Slough (Charleston) Bridge : construction report.

    DOT National Transportation Integrated Search

    1991-12-01

    Construction of the South Slough (Charleston) Bridge was completed in March of 1991. The structure was constructed with prestressed concrete beams using grit-impregnated, epoxy coated prestressing strands. While epoxy coated reinforcing steel has bee...

  4. Determination of brace forces caused by construction loads and wind loads during bridge construction : [summary].

    DOT National Transportation Integrated Search

    2014-04-01

    Bridges are constructed in stages as pilings, : columns, girders, decks, and other components : are added. At each stage, the structure must be : stable. Girders, which add significant weight to : the developing structure, rest on elastomeric : beari...

  5. Design, construction and load testing of the Pat Daly Bridge in Washington County, MO, with internal glass fiber reinforced polymers reinforcement.

    DOT National Transportation Integrated Search

    2013-01-01

    The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...

  6. Development and construction of low-cracking high-performance concrete (LC-HPC) bridge decks : free shrinkage, moisture optimization and concrete production : final report.

    DOT National Transportation Integrated Search

    2009-08-01

    The development and evaluation of low-cracking high-performance concrete (LC-HPC) for use in bridge decks : is described based on laboratory test results and experience gained during the construction of 14 bridges. This report : emphasizes the materi...

  7. 34. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  8. Development and construction of low-cracking high-performance concrete (LC-HPC) bridge decks : free shrinkage, moisture optimization and concrete production : summary report.

    DOT National Transportation Integrated Search

    2009-08-01

    The development and evaluation of low-cracking high-performance concrete (LC-HPC) for use in bridge decks : is described based on laboratory test results and experience gained during the construction of 14 bridges. This report : emphasizes the materi...

  9. Design, construction and load testing of the Pat Daly road bridge in Washington County, MO, with internal glass fiber reinforced polymers reinforcement.

    DOT National Transportation Integrated Search

    2013-01-01

    The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...

  10. 78 FR 2371 - Taking of Marine Mammals Incidental to Specified Activities; Construction of the East Span of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ...-Oakland Bay Bridge AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric..., harbor porpoises, and gray whales, by harassment, incidental to construction of a replacement bridge for the East Span of the San Francisco-Oakland Bay Bridge (SF- OBB) in California. DATES: This...

  11. Use of flow-normalization to evaluate nutrient concentration and flux changes in Lake Champlain tributaries, 1990-2009

    USGS Publications Warehouse

    Medalie, Laura; Hirsch, Robert M.; Archfield, Stacey A.

    2012-01-01

    The U.S. Geological Survey evaluated 20 years of total phosphorus (P) and total nitrogen (N) concentration data for 18 Lake Champlain tributaries using a new statistical method based on weighted regressions to estimate daily concentration and flux histories based on discharge, season, and trend as explanatory variables. The use of all the streamflow discharge values for a given date in the record, in a process called "flow-normalization," removed the year-to-year variation due to streamflow and generated a smooth time series from which trends were calculated. This approach to data analysis can be of great value to evaluations of the success of restoration efforts because it filters out the large random fluctuations in the flux that are due to the temporal variability in streamflow. Results for the full 20 years of record showed a mixture of upward and downward trends for concentrations and yields of P and N. When the record was broken into two 10-year periods, for many tributaries, the more recent period showed a reversal in N from upward to downward trends and a similar reversal or reduction in magnitude of upward trends for P. Some measures of P and N concentrations and yields appear to be related to intensity of agricultural activities, point-source loads of P, or population density. Total flow-normalized P flux aggregated from the monitored tributaries showed a decrease of 30 metric tons per year from 1991 to 2009, which is about 15% of the targeted reduction established by the operational management plan for the Lake Champlain Basin.

  12. U.S. Geological Survey - Virginia Department of Transportation: Bridge scour pilot study

    USGS Publications Warehouse

    Austin, Samuel H.

    2018-02-27

    BackgroundCost effective and safe highway bridge designs are required to ensure the long-term sustainability of Virginia’s road systems. The streamflows that, over time, scour streambed sediments from bridge piers inherently affect bridge safety and design costs. To ensure safety, bridge design must anticipate streambed scour at bridge piers over the lifespan of a bridge. Until recently Federal Highway Administration (FHWA) guidance provided only for scour estimates of granular, noncohesive, highly erosive material yielding overestimates of scour potential in instances when streambed materials offer some resistance to scour. This study seeks to estimate stream power and streambed scour for these more resistive sites, with bridge piers potentially established in cohesive soil or erodible rock. This new knowledge may provide significant construction cost savings while ensuring design and construction of safe highway bridges.

  13. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : V : the Richmond construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  14. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : IV : the Fredericksburg construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  15. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : II : the Staunton construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  16. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : III : the Culpeper construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  17. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  18. Inventory and Evaluation of Engineering Cultural Resources: Montgomery to Gadsden, Alabama Coosa River, Alabama,

    DTIC Science & Technology

    1981-03-01

    to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive

  19. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  20. 37. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of historic construction drawing, ink on linen, no date (est. January 1890) (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  1. 26. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of truss spans. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  2. 31. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss spans): Plan of portal struts. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  3. 36. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of west approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  4. 35. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of east approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  5. 32. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photographic copy of historic construction drawing, ink on linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss span): Detail of longitudinal & top struts. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  6. 25. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of historic construction drawing, ink on linen, November 1889/January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Plan and profile of Selby Avenue Bridge. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  7. 30. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photographic copy of historic construction drawing, ink on linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss spans): section of roadway with details. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  8. 29. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of small truss. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  9. 33. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of shoes, bolsters, & rollers. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  10. 33. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Center and east pier, with framing, makes panorama with preceding photo. Date: 1925-27. Credit: Shenks Photographi, Columbus, Ms. owner. O. Pruitt, photographer, ca. 1926 Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  11. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  12. Soil-structure interaction studies for understanding the behavior of integral abutment bridges.

    DOT National Transportation Integrated Search

    2012-03-01

    Integral Abutment Bridges (IAB) are bridges without any joints within the bridge deck or between the : superstructure and the abutments. An IAB provides many advantages during construction and maintenance of : a bridge. Soil-structure interactions at...

  13. Recommendations for design, construction, and maintenance of bridge approach slabs : synthesis report.

    DOT National Transportation Integrated Search

    2009-04-01

    Bridge approaches provide smooth and safe transition of vehicles from highway pavements to bridge : structures. However, settlement of the bridge approach slab relative to bridge decks usually creates a : bump in the roadway. The bump causes inconven...

  14. 1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING CAUSEWAY, STEEL ARCH, AND EASTBOUND LANE OF NEW BRIDGE UNDER CONSTRUCTION, PARALLELING CAUSEWAY, LOOKING NORTHWEST - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  15. Material characterization of field-cast connection grouts.

    DOT National Transportation Integrated Search

    2013-01-01

    Accelerated bridge construction methods can help increase safety and minimize the inconveniences to the traveling public. Many new construction methods have been investigated and implemented using prefabricated subassemblies on bridges. These methods...

  16. 59. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Construction changes in pier 7 - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  17. GT-5 Recovery Slice Cake

    NASA Image and Video Library

    1965-08-29

    S65-51660 (29 Aug. 1965) --- Astronauts Charles Conrad Jr. (left) and L. Gordon Cooper Jr. prepare to slice into the huge cake prepared for them by the cooks onboard the aircraft carrier USS Lake Champlain. They are using ornamental Navy swords for knives.

  18. ABC deck panel testing.

    DOT National Transportation Integrated Search

    2013-09-01

    Accelerated Bridge Construction techniques have resulted in innovative options that : save time and money during the construction of bridges. One such group of techniques : that has generated considerable interest is the usage of individual precast c...

  19. Precast alternative for flat slab bridges : final report.

    DOT National Transportation Integrated Search

    2013-10-26

    The cast-in-place (CIP) concrete slab bridge and the hollow core flat slab bridge are two very common bridge types utilized by the : South Carolina Department of Transportation (SCDOT). The CIP bridge is durable but has a long construction time while...

  20. 27. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of truss (end with inclined end post). - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  1. 28. Photographic copy of historic construction drawing, ink or linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photographic copy of historic construction drawing, ink or linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of truss (end which abuts small truss). - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  2. Fabry-Perot sensors for the monitoring of FRP reinforced bridge decks

    NASA Astrophysics Data System (ADS)

    Benmokrane, Brahim; Quirion, Marco; El-Salakawy, Ehab; Debaiky, Ahmed S.; Lackey, Tom

    2004-07-01

    The extensive use of deicing salts in Canada during winter times is identified as the main reason behind the deterioration of highway bridges and parking garages. To fight this infrastructure crisis, Fibre Reinforced Polymers (FRP) has become a very attractive alternative to traditional reinforcing steel due to their non-corrosive nature and light weight. The replacement of steel with Glass FRP bars in bridge deck slabs has been extensively researched in the last few years. This paper presents the first efforts to implement these bars in two highway bridges in Quebec, Canada, and Vermont, USA. These projects are aimed to prove the feasibility of using GFRP bars in bridge construction. GFRP bars were used as reinforcement for parts of the deck slabs in the two bridges while traditional steel was used in the remaining parts. Fibre Optic Sensors (FOS) were used to measure strains in the concrete, reinforcing bars and steel girders. The sensors were surface mounted on the bars or steel girders using standard glue, or embedded in concrete. Static and dynamic testing of the bridges was done using loaded trucks placed for maximum stresses. The design, construction, testing, and results obtained from the bridges are briefly outlined in this paper. The results indicated the accuracy of the sensors and their feasibility for bridge construction and remote monitoring.

  3. Development of bridge girder movement criteria for accelerated bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  4. Concentration, flux, and the analysis of trends of total and dissolved phosphorus, total nitrogen, and chloride in 18 tributaries to Lake Champlain, Vermont and New York, 1990–2011

    USGS Publications Warehouse

    Medalie, Laura

    2013-01-01

    Annual concentration, flux, and yield for total phosphorus, dissolved phosphorus, total nitrogen, and chloride for 18 tributaries to Lake Champlain were estimated for 1990 through 2011 using a weighted regression method based on time, tributary streamflows (discharges), and seasonal factors. The weighted regression method generated two series of daily estimates of flux and concentration during the period of record: one based on observed discharges and a second based on a flow-normalization procedure that removes random variation due to year-to-year climate-driven effects. The flownormalized estimate for a given date is similar to an average estimate of concentration or flux that would be made if all of the observed discharges for that date were equally likely to have occurred. The flux bias statistic showed that 68 of the 72 flux regression models were minimally biased. Temporal trends in the concentrations and fluxes were determined by calculating percent changes in flow-normalized annual fluxes for the full period of analysis (1990 through 2010) and for the decades 1990–2000 and 2000–2010. Basinwide, flow-normalized total phosphorus flux decreased by 42 metric tons per year (t/yr) between 1990 and 2010. This net result reflects a basinwide decrease in flux of 21 metric tons (t) between 1990 and 2000, followed by a decrease of 20 t between 2000 and 2010; both results were largely influenced by flux patterns in the large tributaries on the eastern side of the basin. A comparison of results for total phosphorus for the two separate decades of analysis found that more tributaries had decreasing concentrations and flux rates in the second decade than the first. An overall reduction in dissolved phosphorus flux of 0.7 t/yr was seen in the Lake Champlain Basin during the full period of analysis. That very small net change in flux reflects substantial reductions between 1990 and 2000 from eastern tributaries, especially in Otter Creek and the LaPlatte and Winooski Rivers that largely were offset by increases in the Missisquoi and Saranac Rivers in the second decade (between 2000 and 2010). The number of tributaries that had increases in dissolved phosphorus concentrations stayed constant at 13 or 14 during the period of analysis. Total nitrogen concentration and flux for most of the monitored tributaries in the Lake Champlain Basin have decreased since 1990. Between 1990 and 2010, flow-normalized total nitrogen flux decreased by 386 t/yr, which reflects an increase of 440 t/yr between 1990 and 2000 and a decrease of 826 t/yr between 2000 and 2010. All individual tributaries except the Winooski River had decreases in total nitrogen concentration and flux between 2000 and 2010. The decrease in total nitrogen flux over the period of record could be related to the decrease in nitrogen from atmospheric deposition observed in Vermont or to concurrent benefits realized from the implementation of agricultural best-management practices in the Lake Champlain Basin that were designed primarily to reduce phosphorus runoff. For chloride, large increases in flow-normalized concentrations and flux between 1990 and 2000 for 17 of the 18 tributaries diminished to small increases or decreases between 2000 and 2010. Between 1990 and 2010, flow-normalized flux increased by 32,225 t/yr, 78 percent of which (25,163 t) was realized during the first decade, from 1990 through 2000. The five tributaries that had decreasing concentration and flux of chloride between 2000 and 2010 were all on the eastern side of Lake Champlain, possibly related to reductions since 1999 in winter road salt application in Vermont. Positive correlations of phosphorus flux and changes in phosphorus concentration and flux in tributaries with phosphorus inputs to basins from point sources, suggest that point sources have an effect on stream phosphorus chemistry. Several measures of changes in agricultural statistics, such as agricultural land use, acres of land in farms, acres of cropland, and acres of corn for grain or seed, are positively correlated with changes in phosphorus concentration or flux in the tributaries. Negative correlations of the amount of money spent on agricultural best-management practices with changes in phosphorus concentration or flux in the tributaries, suggest that best-management practices may be an effective tool, along with point-source reductions, in making progress towards management goals for phosphorus reductions in Lake Champlain.

  5. Evaluation of stainless steel reinforcement construction project

    DOT National Transportation Integrated Search

    2003-02-01

    Stainless steel reinforcement has greater corrosion resistance than that of the conventional reinforcement. In this project, bridge A6059, the first in Missouri utilizing stainless steel reinforcement in the deck, was constructed, along with bridge A...

  6. Long-term behavior of integral abutment bridges.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical : highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To : expand ...

  7. New state distribution and host records of North American Buprestidae (Coleoptera)

    Treesearch

    Jason A. Hansen; Toby R. Petrice; Robert A. Haack

    2011-01-01

    The following new state records are reported for buprestid species in the eastern United States: Agrilus egeniformis Champlain and Knull and Polyceta elata LeConte from Georgia, Agrilus defectus LeConte and Agrilus vittaticollis (Randall) from Minnesota and Agrilus...

  8. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  9. A 1-2 GHz pulsed and continuous wave electron paramagnetic resonance spectrometer

    NASA Astrophysics Data System (ADS)

    Quine, Richard W.; Rinard, George A.; Ghim, Barnard T.; Eaton, Sandra S.; Eaton, Gareth R.

    1996-07-01

    A microwave bridge has been constructed that performs three types of electron paramagnetic resonance experiments: continuous wave, pulsed saturation recovery, and pulsed electron spin echo. Switching between experiment types can be accomplished via front-panel switches without moving the sample. Design features and performance of the bridge and of a resonator used in testing the bridge are described. The bridge is constructed of coaxial components connected with semirigid cable. Particular attention has been paid to low-noise design of the preamplifier and stability of automatic frequency control circuits. The bridge incorporates a Smith chart display and phase adjustment meter for ease of tuning.

  10. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  11. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  12. 38. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of historic construction drawing, ink on linen, February 1902 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Re- flooring and re-paving of Selby Avenue Bridge over tracks of Chicago, Milwaukee & St. Paul RY. CO. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  13. Rapid bridge construction technology : precast elements for substructures.

    DOT National Transportation Integrated Search

    2011-06-01

    The goal of this research was to propose an alternate system of precast bridge substructures which can : substitute for conventional cast in place systems in Wisconsin to achieve accelerated construction. : Three types of abutment modules (hollow wal...

  14. Flexural anchorage performance at diagonal crack locations.

    DOT National Transportation Integrated Search

    2010-12-01

    Large numbers of reinforced concrete deck girder bridges that were constructed during the interstate system expansion of the 1950s have developed diagonal cracking in the stems. Though compliant with design codes when constructed, many of these bridg...

  15. Evaluation of the composite wing girder bridge at Bear Creek.

    DOT National Transportation Integrated Search

    1984-11-01

    This report documents the construction monitoring and subsequent field testing : to evaluate the performance of an innovative nloose-fit" composite post-tensioned : concrete wing girder bridge constructed over Bear Creek, south of Austin, Texas. : Th...

  16. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  17. Field evaluation of hybrid-composite girder bridges in Missouri.

    DOT National Transportation Integrated Search

    2014-08-01

    Three hybrid composite beam (HCB) bridges were recently constructed in Missouri, USA. HCB is an innovative idea that incorporates traditional construction materials (steel and concrete) with fiber reinforced polymer (FRP) composites in such a manner ...

  18. Implementation and evolution of a regional chronic disease self-management program.

    PubMed

    Liddy, Clare; Johnston, Sharon; Nash, Kate; Irving, Hannah; Davidson, Rachel

    2016-08-15

    To establish a comprehensive, community-based program to improve and sustain self-management support for individuals with chronic diseases and complement office-based strategies to support behaviour change. Health service delivery organizations. The Champlain Local Health Integration Network (LHIN), a health district in Eastern Ontario. We created Living Healthy Champlain (LHC), a regional organization providing peer leader training and coordination for the group Stanford Chronic Disease Self-Management Program (CDSMP); skills training and mentorship in behaviour change approaches for health care providers; and support to organizations to integrate self-management support into routine practice. We used the RE-AIM framework to evaluate the overall program's impact by exploring its reach, effectiveness, adoption, implementation and maintenance. A total of 232 Stanford CDSMP sessions (63 during the pilot project and 169 post-pilot) have been held at 127 locations in 24 cities across the Champlain LHIN, reaching approximately 4,000 patients. The effectiveness of the service was established through ongoing evidence reviews, a focus group and a pre-post utilization study of the pilot. LHC trained over 300 peer volunteers to provide the Stanford CDSMP sessions, 98 of whom continue to activelyhost workshops. An additional 1,327 providers have been trained in other models of self-management support, such as Health Coaching and Motivational Interviewing. Over the study period, LHC grew from a small pilot project to a regional initiative with sustainable provincial funding and was adopted by the province as a model for similar service delivery across Ontario. A community-based self-management program working in partnership with primary care can be effectively and broadly implemented in support of patients living with chronic conditions.

  19. Growth rates of rainbow smelt in Lake Champlain: Effects of density and diet

    USGS Publications Warehouse

    Stritzel, Thomson J.L.; Parrish, D.L.; Parker-Stetter, S. L.; Rudstam, L. G.; Sullivan, P.J.

    2011-01-01

    Stritzel Thomson JL, Parrish DL, Parker-Stetter SL, Rudstam LG, Sullivan PJ. Growth rates of rainbow smelt in Lake Champlain: effects of density and diet. Ecology of Freshwater Fish 2010. ?? 2010 John Wiley & Sons A/S Abstract- We estimated the densities of rainbow smelt (Osmerus mordax) using hydroacoustics and obtained specimens for diet analysis and groundtruthed acoustics data from mid-water trawl sampling in four areas of Lake Champlain, USA-Canada. Densities of rainbow smelt cohorts alternated during the 2-year study; age-0 rainbow smelt were very abundant in 2001 (up to 6fish per m2) and age-1 and older were abundant (up to 1.2fish per m2) in 2002. Growth rates and densities varied among areas and years. We used model selection on eight area-year-specific variables to investigate biologically plausible predictors of rainbow smelt growth rates. The best supported model of growth rates of age-0 smelt indicated a negative relationship with age-0 density, likely associated with intraspecific competition for zooplankton. The next best-fit model had age-1 density as a predictor of age-0 growth. The best supported models (N=4) of growth rates of age-1 fish indicated a positive relationship with availability of age-0 smelt and resulting levels of cannibalism. Other plausible models were contained variants of these parameters. Cannibalistic rainbow smelt consumed younger conspecifics that were up to 53% of their length. Prediction of population dynamics for rainbow smelt requires an understanding of the relationship between density and growth as age-0 fish outgrow their main predators (adult smelt) by autumn in years with fast growth rates, but not in years with slow growth rates. ?? 2011 John Wiley & Sons A/S.

  20. The key quality control technology of main cable erection in long-span suspension bridge construction

    NASA Astrophysics Data System (ADS)

    Chen, Yongrui; Wei, Wei; Dai, Jie

    2017-04-01

    Main cable is one of the most important structure of suspension Bridges, which bear all the dead and live load from upper structure. Cable erection is one of the most critical process in suspension bridge construction. Key points about strand erection are studied in this paper, including strand traction, lateral movement, section adjustment, placing into saddle, anchoring, line shape adjustment and keeping, and tension control. The technology has helped a long-span suspension bridge in Yunnan Province, China get a ideal finished state.

  1. Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge

    NASA Astrophysics Data System (ADS)

    Liu, Q. J.; Wan, S.; Liu, H. C.

    2017-11-01

    This paper is based on Nanpuxi super major bridge which is under construction and starts from Wencheng Zhejiang province to Taishun highway. A finite element model of the whole bridge is constructed using Midas Civil finite element software. The most adverse load combination in the specification is taken into consideration to determine the method of calculating the arch-axis coefficient of long-span deck-type concrete-filled steel tubular arch bridge. By doing this, this paper aims at providing references for similar engineering projects.

  2. 78 FR 56605 - Drawbridge Operation Regulation; Lafourche Bayou, Larose, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... reference to the SR 310 (Larose Pontoon) Bridge with the LA 657 (Larose) Vertical Lift Bridge. The SR 310...) Vertical Lift Bridge, which is located approximately one-half mile away from the old bridge. The old SR 310....1. This bridge has been replaced by the newly constructed LA 657 (Larose) Vertical Lift Bridge...

  3. Long-term behavior of integral abutment bridges : [technical summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  4. Seismic retrofit of spliced sleeve connections for precast bridge piers.

    DOT National Transportation Integrated Search

    2017-03-01

    Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pie...

  5. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  6. Reliability Modeling of Double Beam Bridge Crane

    NASA Astrophysics Data System (ADS)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  7. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  8. A study of girder deflections during bridge deck construction : final report.

    DOT National Transportation Integrated Search

    1971-01-01

    Problems involved in obtaining the desired thickness of bridge decks were investigated. The study, which was limited to decks which were longitudinally screeded during construction, included (1) field measurements of the girder deflections during con...

  9. Flexural anchorage performance at diagonal crack locations : final report.

    DOT National Transportation Integrated Search

    2010-12-01

    Large numbers of reinforced concrete deck girder bridges that were constructed during the interstate system expansion of the 1950s have developed diagonal cracking in the stems. Though compliant with design codes when constructed, many of these bridg...

  10. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

    DOT National Transportation Integrated Search

    1996-01-01

    These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...

  11. Field evaluation of hybrid\\0x2010composite girder bridges in Missouri.

    DOT National Transportation Integrated Search

    2014-06-01

    Three hybrid composite beam (HCB) bridges were recently constructed in Missouri, USA. HCB is an innovative idea : that incorporates traditional construction materials (steel and concrete) with fiber reinforced polymer (FRP) composites : in such a man...

  12. 3D laser scanning for quality control and assurance in bridge deck construction.

    DOT National Transportation Integrated Search

    2014-08-01

    The inspection of installations of rebar and other embedded components in bridge deck construction is a tedious : task for eld inspectors, requiring considerable eld time for measurement and verication against code requirement. The verica...

  13. Evidence of sound production by spawning lake trout (Salvelinus namaycush) in lakes Huron and Champlain

    USGS Publications Warehouse

    Johnson, Nicholas S.; Higgs, Dennis; Binder, Thomas R.; Marsden, J. Ellen; Buchinger, Tyler John; Brege, Linnea; Bruning, Tyler; Farha, Steve A.; Krueger, Charles C.

    2018-01-01

    Two sounds associated with spawning lake trout (Salvelinus namaycush) in lakes Huron and Champlain were characterized by comparing sound recordings to behavioral data collected using acoustic telemetry and video. These sounds were named growls and snaps, and were heard on lake trout spawning reefs, but not on a non-spawning reef, and were more common at night than during the day. Growls also occurred more often during the spawning period than the pre-spawning period, while the trend for snaps was reversed. In a laboratory flume, sounds occurred when male lake trout were displaying spawning behaviors; growls when males were quivering and parallel swimming, and snaps when males moved their jaw. Combining our results with the observation of possible sound production by spawning splake (Salvelinus fontinalis × Salvelinus namaycush hybrid), provides rare evidence for spawning-related sound production by a salmonid, or any other fish in the superorder Protacanthopterygii. Further characterization of these sounds could be useful for lake trout assessment, restoration, and control.

  14. Pollution monitoring in Lake Champlain using ERTS-1 imagery

    NASA Technical Reports Server (NTRS)

    Lind, A. O. (Principal Investigator); Henson, E. B.

    1973-01-01

    The author has identified the following significant results. Band 4 imagery of April 7 and 25 show contrasting pollution effects due to seasonal and discharge variations. The pollution plume emanating from the International Paper Co. mill just north of Fort Ticonderoga was first detected on October 10 ERTS-1 imagery and now has been documented during spring high lake level conditions. The plume was observed extending further to the north and east than under low water conditions of October 10. This northward extension reflects a stronger northward current flow expected in the turbid southern leg of Lake Champlain. The extensive plume of April 25 represents full plant operation while the April 5 scene shows some plume traces directly over the submerged diffuser, discharge pipe representing minimal discharge during weekend plant operation. The ERTS-1 documentation will be used in developing a model of plume behavior under varying environmental conditions and will hopefully serve to assist in a major resource decision pending at U.S. Supreme Court level.

  15. Evaluation of cracking of the US 331 bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The focus of this report is a three-span, continuous, skewed bridge that was constructed in the : summer of 2003 as the northbound roadway bridge on US 331 in Montgomery County, : Alabama. This bridge deck exhibited extensive transverse and horizonta...

  16. Structural monitoring of Rigolets Pass Bridge : LTRC technical summary report 437.

    DOT National Transportation Integrated Search

    2009-09-01

    The Louisiana Department of Transportation and Development (LADOTD) has been gradually : introducing high performance concrete (HPC) into their bridge construction programs. The : Rigolets Pass Bridge is a 62-span bridge with a total length of 5,489 ...

  17. Research notes : soil nailing of a bridge fill embankment.

    DOT National Transportation Integrated Search

    1991-11-01

    A recent construction project involved widening and lowering the grade of the Swift Highway under the south end of the Oregon Slough Bridge approximately seven miles north of Portland. This project included construction of the first permanent soil na...

  18. A literature survey on industrialized bridge construction.

    DOT National Transportation Integrated Search

    1972-01-01

    The purpose of this survey was to aid the writer in understanding and retaining material in preparation for a project on the industrialization of bridge construction. However, it was believed that the results of the survey would be informative to oth...

  19. Feasibility of using high-strength steel and MMFX rebar in bridge design.

    DOT National Transportation Integrated Search

    2009-07-01

    Pressed by increases in construction costs coupled with insufficient funding for maintenance and new construction, many state and federal agencies are now specifying a service life of 75 years for all concrete bridges without significant repairs. In ...

  20. An industrialized construction approach to concrete superstructures for bridges.

    DOT National Transportation Integrated Search

    1974-01-01

    The objective of this study was to develop drawings for a specific site or sites that incorporated the best concepts of industrialized bridge superstructure construction, that is, great emphasis was placed upon the use of modular design and assembly ...

  1. Construction of bridge decks with precast prestressed deck planks

    DOT National Transportation Integrated Search

    2002-04-01

    The purpose of this paper is to discuss the construction and early performance of two 1999 - 2000 bridge deck replacement state contracts in Illinois that included precast, prestressed concrete (PPC) deck planks. Metal stay-in-place forms used in one...

  2. Latex-modified fiber-reinforced concrete bridge deck overlay : construction/interim report.

    DOT National Transportation Integrated Search

    1993-06-01

    Latex-modified concrete (LMC) is Portland cement concrete (PCC) with an admixture of latex. LMC is considered to be nearly impermeable to chlorides and is extensively used to construct bridge deck overlays. Unfortunately, some of these overlays have ...

  3. Bridge-in-a-Backpack(TM). Task 4 : monitoring and load rating.

    DOT National Transportation Integrated Search

    2015-01-01

    Five bridges were constructed utilizing UMaines hybrid composite arch technology as part of the Maine : Department of Transportations Composites Initiative. Three were constructed in 2010, one in 2011 and the final : one in 2012. The designs fo...

  4. Laboratory investigation of grouted coupler connection details for ABC bridge projects : [tech transfer summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Advancements and increased use of accelerated bridge construction (ABC) : often result in the use of newly developed, or modified, technologies and/or : construction techniques that are sometimes untested in this new application. : For designers and ...

  5. Aerial view of the entire bridge crossing the Tennessee River ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Aerial view of the entire bridge crossing the Tennessee River looking up river. The swing bridge, when open, permits river navigational traffic to ply the river. Construction of a replacement bridge, to be located 93.27 feet down river, has now started. - Bridgeport Swing Span Bridge, Spanning Tennessee River, Bridgeport, Jackson County, AL

  6. 77 FR 35900 - Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... navigable waters during the Gilmerton Bridge Center Span Float- in and bridge construction of span placement... the existing bascule spans from the Gilmerton Bridge, transport the new center span from the Eastern...

  7. 77 FR 44544 - Safety Zone; Gilmerton Bridge Center Span Float-In, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-In, Elizabeth River; Norfolk, Portsmouth, and... withdrawing its proposed rule concerning the Gilmerton Bridge Center Span Float-in and bridge construction of... ``Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and Chesapeake...

  8. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  9. Laboratory investigation of grouted coupler connection details for ABC bridge projects.

    DOT National Transportation Integrated Search

    2015-08-01

    With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge : designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC exam...

  10. 21. c, 1915 Historic plan, standard 2 beam girder bridge. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. c, 1915 Historic plan, standard 2 beam girder bridge. United Construction Company, Albany, New York. Generic plan typical of Prescott Bridge. Source: New Hampshire Department of Transportation - Prescott Bridge, Spanning Lamprey River on Prescott Road, Raymond, Rockingham County, NH

  11. NHDOT : process for municipally-managed state bridge aid program projects

    DOT National Transportation Integrated Search

    2007-09-12

    The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...

  12. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The purpose of this research was to characterize the performance of High Strength Lightweight Concrete (HSLW) in precast, prestressed bridge girders and to evaluate their performance in a highway bridge. The mechanical properties and long-term time-d...

  13. Cane Creek flood-flow characteristics at State Route 30 near Spencer, Tennessee

    USGS Publications Warehouse

    Gamble, Charles R.

    1983-01-01

    The Tennessee Department of Transportation has constructed a new bridge and approaches on State Route 30 over Cane Creek near Spencer, Tennessee. The old bridge and its approaches were fairly low, permitting considerable flow over the road during high floods. The new bridge and its approaches are considerably higher, causing different flow conditions at the site. Analysis of the effects of the new bridge, as compared to the old bridge, on floods of the magnitude of the May 27, 1973, flood is presented. The May 27, 1973, flood was greater than a 100-year flood. Analysis of the 50- and 100-year floods for the new bridge are also presented. Results of the study indicate that the new construction will increase the water-surface elevation for a flood equal to the May 27, 1973, flood by approximately 1 foot upstream from bridge. (USGS)

  14. 76 FR 12129 - Lake Champlain Sea Lamprey Control Alternatives Workgroup

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... priorities for research to be control methods alternative to lampricides, to recommend priorities for... Workgroup's purpose is to provide, in an advisory capacity, recommendations and advice on research and... research initiatives that may enhance alternative sea lamprey control techniques. The meeting is open to...

  15. 40 CFR 52.2375 - Attainment dates for national standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 52.2375 Section 52.2375 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2375... control region and nonattainment area 1 Pollutant SO2 Primary Secondary PM10 NOX CO O3 Champlain Valley...

  16. 40 CFR 52.2375 - Attainment dates for national standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... 52.2375 Section 52.2375 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2375... control region and nonattainment area 1 Pollutant SO2 Primary Secondary PM10 NOX CO O3 Champlain Valley...

  17. 40 CFR 52.2375 - Attainment dates for national standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... 52.2375 Section 52.2375 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2375... control region and nonattainment area 1 Pollutant SO2 Primary Secondary PM10 NOX CO O3 Champlain Valley...

  18. 40 CFR 52.2375 - Attainment dates for national standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... 52.2375 Section 52.2375 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2375... control region and nonattainment area 1 Pollutant SO2 Primary Secondary PM10 NOX CO O3 Champlain Valley...

  19. 16. PHOTOCOPY OF HISTORIC VIEW, HALFTONE PLATE DEPICTING CONSTRUCTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. PHOTOCOPY OF HISTORIC VIEW, HALF-TONE PLATE DEPICTING CONSTRUCTION OF BOSTON STREET BRIDGE, DATED DECEMBER 21, 1901, AND SHOWING CONCENTRIC RING OR ROWLOCK BOND CONSTRUCTION TECHNIQUE (HALF-TONE PLATE PUBLISHED IN BALTIMORE CITY ENGINEER'S ANNUAL REPORT FOR 1901, COURTESY ENOCH PRATT FREE LIBRARY) - Boston Street Bridge, Spanning Harris Creek Sewer at Boston Street, Baltimore, Independent City, MD

  20. A novel methodology for quantifying the performance of constructed bridges in cold regions.

    DOT National Transportation Integrated Search

    2014-04-01

    This report presents a two-part research program examining the performance of constructed bridges in a : cold region, represented by those in the State of North Dakota, and the behavior of concrete members : strengthened with carbon fiber reinforced ...

  1. Stress-corrosion susceptibility of highway bridge construction steels. Phase I

    DOT National Transportation Integrated Search

    1972-04-01

    A catalog of steels used in highway bridge construction has been developed. A state-of-the-art survey on the stress-corrosion susceptibility of these steels has been conducted. The types and concentrations of corrosives that can be experienced in the...

  2. Distribution factors for construction loads and girder capacity equations [project summary].

    DOT National Transportation Integrated Search

    2017-03-01

    This project focused on the use of Florida I-beams (FIBs) in bridge construction. University of Florida researchers used analytical models and finite element analysis to update equations used in the design of bridges using FIBs. They were particularl...

  3. Long-term behavior of integral abutment bridges : appendix D, Bowen lab soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  4. 2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND HILL ROAD BRIDGE, CA. 1936. COLLECTION OF GEORGE L. LARNED. - Merritt Parkway, Round Hill Road Bridge, Spanning Merritt Parkway at 3.5 mile mark, Greenwich, Fairfield County, CT

  5. Simple analysis of the effect of construction materials on bridge impact factors

    DOT National Transportation Integrated Search

    1999-06-01

    The purpose of this research is to study the influence of different construction materials on the dynamic impact factor of bridges. Initially, introduction of the dynamic impact factor and some evaluation methods are presented. A comparison of the re...

  6. Geotextile reinforced bridge approach embankment : Lake River Bridge - Malin Highway , Klamath County, Oregon : final report.

    DOT National Transportation Integrated Search

    1997-08-01

    An experimental construction method was evaluated at the Lost River Bridge in Klamath County to reduce the discontinuity between the bridge and the roadway. The method included combining soil in six 300-mm lifts interlaced with geotextile reinforceme...

  7. Use of innovative concrete mixes for improved constructability and sustainability of bridge decks.

    DOT National Transportation Integrated Search

    2013-11-01

    Bridge deck crack surveys were performed on twelve bridges on US-59 south of Lawrence, Kansas, to determine the effects of : mixture proportions, concrete properties, deck type, and girder type on the crack density of reinforced concrete bridge decks...

  8. "Bridge #6 Rock Creek: Castiron 48" pipe lines to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  9. 3. DEADWOOD CREEK BRIDGE, VIEW BELOW DECK SHOWING OPEN SPANDREL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. DEADWOOD CREEK BRIDGE, VIEW BELOW DECK SHOWING OPEN SPANDREL ARCH CONSTRUCTION AND ARCH RIBS - Deadwood Creek Bridge, Spanning Deadwood Creek on Mather Memorial Parkway, Longmire, Pierce County, WA

  10. Monitoring of a concrete arch bridge during construction

    NASA Astrophysics Data System (ADS)

    Inaudi, Daniele; Ruefenacht, A.; von Arx, B.; Noher, H. P.; Vurpillot, Samuel; Glisic, Branko

    2002-06-01

    The Siggenthal Bridge is a concrete arch bridge with an arch span of 117 m, being built over the Limmat River in Baden, Switzerland. This bridge has been instrumented with 58 long- gage SOFO fiber optic deformation sensors, 2 inclinometers and 8 temperature sensors to monitor its deformations, curvatures and displacements during construction and int eh long-term. The sensor have been built installed successfully and the arch was monitored during the removal of the formwork and supports. It was therefore possible to observe the deformations of the arch wen being loaded by its dead load and by the daily temperature fluctuations. The measurements have shown that the temperature changes produce deformations of the same order of magnitude as the dead loads. The out-of-plain displacements obtained by double- integration of the measured curvatures are in good agreement with the direct triangulation measurements. Monitoring was also carried out during the construction of the superstructure, with the associated change of the load distribution in the arch. This paper briefly introduces the functional principle of the long-gage sensors used in this application, illustrates their installation and discusses the measurement results obtained during the bridge construction.

  11. 77 FR 73541 - Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...-AA00 Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... Gilmerton Bridge Center Span Float- in and bridge construction of span placement. This action is intended to... rulemaking (NPRM) proposing a safety zone in the Gilmerton Bridge Area (77 FR 43557) on September 5-9, 2012...

  12. A novel methodology for quantifying the performance of constructed bridges in cold regions : [project brief].

    DOT National Transportation Integrated Search

    2014-04-01

    This report presents a two-part research program examining the performance of constructed : bridges in a cold region, represented by those in the State of North Dakota, and the behavior of : concrete members strengthened with carbon fiber reinforced ...

  13. First bridge structure with lightweight high-performance concrete beams and deck in Virginia.

    DOT National Transportation Integrated Search

    2005-01-01

    This study involved the construction and early performance of the first bridge in Virginia constructed with lightweight high-performance concrete (LWHPC) having a density of 120 lb/ft3 in the beams and deck. The design strength and permeability were ...

  14. Long-term behavior of integral abutment bridges : appendix C, US231 over railroad spur soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  15. Feasibility evaluation of utilizing high-strength concrete in design and construction of highway bridge structures.

    DOT National Transportation Integrated Search

    1994-01-01

    The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...

  16. Underwater acoustic noise generation and propagation resulting from pile driving for Oregon bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    There is growing concern about noise levels from pile driving activities associated with the : construction of highway bridges and other in-water structures. It has been demonstrated that noise : generated from pile driving with an impact hammer can ...

  17. Rapid construction of Pacific Street Bridge with o.7 inch strands.

    DOT National Transportation Integrated Search

    2010-10-01

    The Pacific Street Bridge over I-680 in Omaha, NE is the first bridge in the United States to use 0.7-in.-diameter prestressing : strands in pretensioned concrete girders. This project was funded by FHWA through NDOR under the Innovative Bridge Resea...

  18. Use of innovative concrete mixes for improved constructability and sustainability of bridge decks : [technical summary].

    DOT National Transportation Integrated Search

    2013-11-01

    Bridge deck crack surveys were performed on twelve bridges on US-59 south of Lawrence, Kansas, to determine the effects of mixture proportions, concrete properties, deck type, and girder type on the crack density of reinforced concrete bridge decks.

  19. INVESTIGATIONS INTO THE CAUSES OF AMPHIBIAN MALFORMATIONS IN THE LAKE CHAMPLAIN BASIN OF NEW ENGLAND (AWARDED PROJECT)

    EPA Science Inventory

    The concurrent geographic extent and rate of amphibian malformations appear to have markedly increased above background levels in recent years in many states and Canadian provinces as documented by the North American Reporting Center for Amphibian Malformations (www.npwrc.usgs.go...

  20. 77 FR 25472 - Amended Notice of Intent To Modify the Scope of the Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-30

    ... of settlement negotiations among New York (NY) State agencies, Champlain Hudson Power Express, Inc.... Subsequently, the Applicant entered into settlement negotiations with several parties regarding the proposed... negotiations resulted in a ``Joint Proposal'' which includes a proposed project alignment and configuration...

  1. 9 CFR 93.303 - Ports designated for the importation of horses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-Clearwater, and Tampa, Florida; Atlanta, Georgia; Honolulu, Hawaii; Chicago, Illinois; New Orleans, Louisiana... section, §§ 93.308(a), (b) and (c) and 93.317: Los Angeles, California; Miami, Florida; and Newburgh, New... Sweetgrass, Montana; Alexandria Bay, Buffalo, and Champlain, New York; Dunseith, Pembina, and Portal, North...

  2. Snow accumulations and melt under certain forest conditions in the Adirondacks

    Treesearch

    Howard W. Lull; Francis M. Rushmore

    1960-01-01

    The Adirondack region of New York is a land of many lakes and streams. It feeds water into Lake Champlain, Lake Ontario, the St. Lawrence River, and the Hudson River. Much of this streamflow comes from the melting of the spring snowpack in the Adirondacks.

  3. Historical trace metal accumulation in the sediments of an urbanized region of the Lake Champlain watershed, Burlington, Vermont

    USGS Publications Warehouse

    Mecray, E.L.; King, J.W.; Appleby, P.G.; Hunt, A.S.

    2001-01-01

    This study documents the history of pollution inputs in the Burlington region of Lake Champlain, Vermont using measurements of anthropogenic metals (Cu, Zn, Cr, Pb, Cd, and Ag) in four age-dated sediment cores. Sediments record a history of contamination in a region and can be used to assess the changing threat to biota over time and to evaluate the effectiveness of discharge regulations on anthropogenic inputs. Grain size, magnetic susceptibility, radiometric dating and pollen stratigraphy were combined with trace metal data to provide an assessment of the history of contamination over the last 350 yr in the Burlington region of Lake Champlain. Magnetic susceptibility was initially used to identify land-use history for each site because it is a proxy indicator of soil erosion. Historical trends in metal inputs in the Burlington region from the seventeenth through the twentieth centuries are reflected in downcore variations in metal concentrations and accumulation rates. Metal concentrations increase above background values in the early to mid nineteenth century. The metal input rate to the sediments increases around 1920 and maximum concentrations and accumulation rates are observed in the late 1960s. Decreases in concentration and accumulation rate between 1970 and the present are observed, for most metals. The observed trends are primarily a function of variations in anthropogenic inputs and not variations in sediment grain size. Grain size data were used to remove texture variations from the metal profiles and results show trends in the anthropogenic metal signals remain. Radiometric dating and pollen stratigraphy provide well-constrained dates for the sediments thereby allowing the metal profiles to be interpreted in terms of land-use history.This study documents the history of pollution inputs in the Burlington region of Lake Champlain, Vermont using measurements of anthropogenic metals (Cu, Zn, Cr, Pb, Cd, and Ag) in four age-dated sediment cores. Sediments record a history of contamination in a region and can be used to assess the changing threat to biota over time and to evaluate the effectiveness of discharge regulations on anthropogenic inputs. Grain size, magnetic susceptibility, radiometric dating and pollen stratigraphy were combined with trace metal data to provide an assessment of the history of contamination over the last 350 yr in the Burlington region of Lake Champlain. Magnetic susceptibility was initially used to identify land-use history for each site because it is a proxy indicator of soil erosion. Historical trends in metal inputs in the Burlington region from the seventeenth through the twentieth centuries are reflected in downcore variations in metal concentrations and accumulation rates. Metal concentrations increase above background values in the early to mid nineteenth century. The metal input rate to the sediments increases around 1920 and maximum concentrations and accumulation rates are observed in the late 1960s. Decreases in concentration and accumulation rate between 1970 and the present are observed for most metals. The observed trends are primarily a function of variations in anthropogenic inputs and not variations in sediment grain size. Grain size data were used to remove texture variations from the metal profiles and results show trends in the anthropogenic metal signals remain. Radiometric dating and pollen stratigraphy provide well-constrained dates for the sediments thereby allowing the metal profiles to be interpreted in terms of land-use history.

  4. 9. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Harter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW OF ASH AVENUE BRIDGE UNDER CONSTRUCTION, LOOKING NORTH, SHOWING STEEL REINFORCEMENT IN DECK BEFORE PLACEMENT OF CONCRETE - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  5. The optimum tension for bridging sutures in transosseous-equivalent rotator cuff repair: a cadaveric biomechanical study.

    PubMed

    Park, Ji Soon; McGarry, Michelle H; Campbell, Sean T; Seo, Hyuk Jun; Lee, Yeon Soo; Kim, Sae Hoon; Lee, Thay Q; Oh, Joo Han

    2015-09-01

    Transosseous-equivalent (TOE) rotator cuff repair can increase contact area and contact pressure between the repaired cuff tendon and bony footprint and can show higher ultimate loads to failure and smaller gap formation compared with other repair techniques. However, it has been suggested that medial rotator cuff failure after TOE repair may result from increased bridging suture tension. To determine optimum bridging suture tension in TOE repair by evaluating footprint contact and construct failure characteristics at different tensions. Controlled laboratory study. A total of 18 fresh-frozen cadaveric shoulders, randomly divided into 3 groups, were constructed with a TOE configuration using the same medial suture anchor and placing a Tekscan sensing pad between the repaired rotator cuff tendon and footprint. Nine of the 18 shoulders were used to measure footprint contact characteristics. With use of the Tekscan measurement system, the contact pressure and area between the rotator cuff tendon and greater tuberosity were quantified for bridging suture tensions of 60, 90, and 120 N with glenohumeral abduction angles of 0° and 30° and humeral rotation angles of 30° (internal), 0°, and 30° (external). TOE constructs of all 18 shoulders then underwent construct failure testing (cyclic loading and load to failure) to determine the yield load, ultimate load, stiffness, hysteresis, strain, and failure mode at 60 and 120 N of tension. As bridging suture tension increased, contact force, contact pressure, and peak pressure increased significantly at all positions (P < .05 for all). Regarding contact area, no significant differences were found between 90 and 120 N at all positions, although there were significant differences between 60 and 90 N. The construct failure test demonstrated no significant differences in any parameters according to various tensions (P > .05 for all). Increasing bridging suture tension to over 90 N did not improve contact area but did increase contact force and pressure. Bridging suture tension did not significantly affect ultimate failure loads. Considering the risks of overtensioning bridging sutures, it may be clinically more beneficial to keep bridging suture tension below 90 N. © 2015 The Author(s).

  6. Seismic Performance of Columns with Grouted Couplers in Idaho Accelerated Bridge Construction Applications

    DOT National Transportation Integrated Search

    2016-10-16

    n Accelerated Bridge Construction (ABC) methods, one way to connect prefabricated columns is by using grouted steel bar couplers. As of October 2016, in the U.S., only Utah DOT allows the use of grouted couplers in plastic hinge locations in seismic ...

  7. 37. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Stress sheet, continuous span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  8. Stay-in-place bridge deck forms, a state of the art review. Prestressed panel subdecks.

    DOT National Transportation Integrated Search

    1973-01-01

    The results of prior research conducted on precast prestressed panel subdecks for use in the construction of bridge decks are reviewed and summarized. This construction technique utilizes the precast panel subdecks as the forming for the cast-in-plac...

  9. Two-course bonded concrete bridge deck construction : condition and performance after six years.

    DOT National Transportation Integrated Search

    1981-01-01

    This report presents the findings from a six-year study of two-course bonded concrete bridge decks constructed in Virginia. Each of three special portland cement concretes was applied as an overlay, or wearing course, on two experimental spans. The o...

  10. Feasibility evaluation of utilizing high strength concrete in design and construction of highway bridge structures : interim report.

    DOT National Transportation Integrated Search

    1992-12-01

    The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...

  11. 75 FR 27428 - Safety Standards for Steel Erection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... in National Highway System construction projects to comply with a number of standards, policies, and...://www.fhwa.dot.gov/bridge/lrfd/index.htm .) For projects involving bridge construction (e.g., temporary... of these requirements will enhance the safety of employees operating on or near structural steel...

  12. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Treesearch

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  13. NPSNET: Dynamic Terrain and Cultured Feature Depiction

    DTIC Science & Technology

    1992-09-01

    defaults. bridge(terrain *ptr, vertex pos, bridge mattype bmat ); This constructor takes only the pointer to the underlying terrain, a placement, and a...material to use for construction. bridge(terrain *ptr, vertex pos, bridge-mattype bmat , float dir); This constructor takes a terrain pointer, a...placement position, a material to use, and a direction to run. bridge(terrain *ptr, vertex pos, bridge-mattype bmat , float dir, float width, float height

  14. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  15. Recommendations for the connection between full-depth precast bridge deck panel systems and precast I-beams.

    DOT National Transportation Integrated Search

    2007-01-01

    Precast bridge deck panels can be used in place of a cast-in-place concrete deck to reduce bridge closure times for deck replacements or new bridge construction. The panels are prefabricated at a precasting plant providing optimal casting and curing ...

  16. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 1--electrochemical testing and reliability assessment.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. PT bridges are economical for spanning long distances. : In Texas, there are several signature PT bridges. In the late 1990s and early 2000s, several state highway agenc...

  17. Long term monitoring of carbon composite strands in the Penobscot-Narrows bridge.

    DOT National Transportation Integrated Search

    2015-06-01

    The Penobscot-Narrows Bridge was constructed between May 2003 and December 2006. The bridge is a cable-stayed design with twin pylons and a 2,120-foot span. This cable-stayed bridge features a cradle stay system that : allows for each cable strand in...

  18. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  19. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  20. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  1. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  2. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Treesearch

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  3. Three-unit bridge construction in anterior single-pontic areas using a metal-free restorative.

    PubMed

    Narcisi, E M

    1999-02-01

    A new glass-ceramic material, IPS Empress 2, is revolutionizing esthetic restorative dentistry by allowing metal-free, three-unit bridge construction in anterior and premolar single-pontic areas. The case discussed in this article illustrates the material's application in the dual-arch restoration of a young woman with congenitally missing teeth. The material was used as an alternative to single-tooth implant restorations to place two maxillary three-unit bridges, one mandibular three-unit bridge, and two mandibular porcelain veneers. IPS Empress 2 provides an esthetic alternative to porcelain-fused-to-metal restorations by facilitating attractive, functional tooth restoration.

  4. CF60 Concrete Composition Design and Application on Fudiankou Xijiang Super Large Bridge

    NASA Astrophysics Data System (ADS)

    Qiu, Yi Mei; Wen, Sen Yuan; Chen, Jun Xiang

    2018-06-01

    Guangxi Wuzhou City Ring Road Fudiankou Xijiang super large bridge CF60 concrete is a new multi-phase composite high-performance concrete, this paper for the Fudiankou Xijiang bridge structure and characteristics of the project, in accordance with the principle of local materials and technical specification requirements, combined with the site conditions of CF60 engineering high performance concrete component materials, proportion and the technical performance, quantify the main physical and mechanical performance index. Analysis main influencing factors of the technical indicators, reasonable adjustment of concrete mix design parameters, and the use of technical means of admixture and multi-function composite admixture of concrete, obtain the optimal proportion of good work, process, mechanical properties stability and durability of engineering properties, recommend and verification of concrete mix; to explore the CF60 high performance concrete Soil in the Fudiankou Xijiang bridge application technology, detection and tracking the quality of concrete construction, concrete structure during the construction of the key technology and control points is proposed, evaluation of CF60 high performance concrete in the actual engineering application effect and benefit to ensure engineering quality of bridge structure and service life, and super long span bridge engineering construction to provide basis and reference.

  5. 41. Photographic copy of the original construction drawing, 192627, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of the original construction drawing, 1926-27, by Harrington, Howard, and Ash, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. STRESS SHEET - Cape Girardeau Bridge, Spanning Mississippi River at State Highway 146, Cape Girardeau, Cape Girardeau County, MO

  6. 45. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Cross section--300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  7. 44. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Details of 300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  8. Two-course bonded concrete bridge deck construction : interim report no. 2, concrete properties and deck condition prior to opening to traffic.

    DOT National Transportation Integrated Search

    1976-01-01

    Presented in this report is information concerning the characteristics of the concretes used to construct six experimental two-course bonded bridge decks in Virginia. The quality of the overlay concretes produced under standard specifications supplem...

  9. Use of high performance, high strength concrete (HPC) bulb-tee girders saves millions on I-10 twin span bridge in New Orleans district.

    DOT National Transportation Integrated Search

    2005-01-01

    History: LADOTD has been gradually introducing high performance, high strength concrete into its bridge construction program. At the same time, LTRC has been sponsoring research work to address design and construction issues related to the utilizatio...

  10. 10. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  11. Cost and Ecological Feasibility of using UHPC in Highway Bridges

    DOT National Transportation Integrated Search

    2017-11-15

    There is a growing interest in expanding the use of Ultra-high performance concrete (UHPC) from bridge deck joints for accelerated bridge construction to complex architectural and advanced structural applications. The high costs currently associated ...

  12. Bridge inspection / washing program : bridge drainage program

    DOT National Transportation Integrated Search

    2002-02-01

    The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...

  13. Durability assessment of prefabricated bridge elements and systems.

    DOT National Transportation Integrated Search

    2015-02-01

    This study aims to address some of the concerns related to implementation of prefabricated bridge elements and systems (PBES) : and accelerated bridge construction (ABC) in Maryland, where some barriers included assessment of the quality and durabili...

  14. 6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING SURROUNDING DEVELOPMENT FROM CONSTRUCTION OF DAM - Columbia River Bridge at Grand Coulee Dam, Spanning Columbia River at State Route 155, Coulee Dam, Okanogan County, WA

  15. A forecast of bridge engineering, 1980-2000.

    DOT National Transportation Integrated Search

    1979-01-01

    A three-pronged study was undertaken to forecast the nature of bridge engineering and construction for the years 1980 to 2000. First, the history of bridge engineering was explored to extrapolate likely future developments. Second, a detailed questio...

  16. Guidelines For The Use, Design, And Construction Of Bridge Approach Slabs

    DOT National Transportation Integrated Search

    1999-11-01

    Differential settlement at the roadway/bridge interface typically results in an abrupt grade change, causing driver discomfort impairing driver safety, and exerting potentially excessive impact traffic loading on the abutment. Bridge approach slabs a...

  17. 6. VIEW FACING EAST ALONG NORTH FACE OF BRIDGE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW FACING EAST ALONG NORTH FACE OF BRIDGE AT CONSTRUCTION DETAILS OF WOOD RAILINGS AND STONE ABUTMENTS. - South Fork Tuolumne River Bridge, Spanning South Fork Tuolumne River on Tioga Road, Mather, Tuolumne County, CA

  18. Acoustic energy propagation around railways

    NASA Astrophysics Data System (ADS)

    Cizkova, Petra

    2017-09-01

    The article deals with the issues of acoustic energy propagation around railways. The research subject was noise emission spreading into the surroundings during the passage of trains over a directly travelled steel bridge construction. Noise emissions were measured using direct measurements in the field. The measurements were performed in two measurement profiles. The noise exposures A LAE measured near the steel bridge construction were compared against the noise exposures A LAE captured on an open track. From the difference of these data, the noise level of the steel bridge structure was determined. Part of the research was to evaluate the effect of the reconstruction of the railway track superstructure on the acoustic situation in the given section of the railway track. The article describes the methodology of measurements, including the processing and evaluation of measured data. The article points out the noise levels of the steel bridge construction and assesses changes in the acoustic situation after the reconstruction.

  19. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  20. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek : tech transfer summary.

    DOT National Transportation Integrated Search

    2013-04-01

    To address the need for the development of a fast, repeatable, and dependable way to replace typical bridges across the country, the Transportation Research Board (TRB) developed project R04, Innovative Designs for Rapid Renewal, as part of the...

  1. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  2. 77 FR 1020 - Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-09

    ...-AA11 Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA... Mystic River under and surrounding the S99 Alford Street Bridge which crosses the Mystic River between... construction workers by restricting vessel traffic during periods where the bridge is being repaired. DATES...

  3. 78 FR 4331 - Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... 1625-AA00 Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR AGENCY: Coast Guard, DHS... the Sellwood Bridge, located on the Willamette River in Portland, Oregon, while it is being relocated 66 feet downriver as part of the new Sellwood Bridge construction project. This action is necessary...

  4. Contact area and pressure in suture bridge rotator cuff repair using knotless lateral anchors.

    PubMed

    Tompkins, Marc; Monchik, Keith O; Plante, Matthew J; Fleming, Braden C; Fadale, Paul D

    2011-10-01

    To evaluate whether the use of knotless lateral anchors in a suture bridge construct produces better contact area and pressure parameters than a suture bridge construct with standard lateral anchors that require knots or a double-row repair. The hypothesis was that knotless lateral anchors would produce better contact area and pressure parameters than the other two constructs. A total of fifteen matched pairs of cadaveric shoulders were divided into three groups. In Group 1, a suture bridge using knotless anchors for the lateral row was performed on five shoulders. A suture bridge using standard lateral row anchors that require knots was performed on the contralateral shoulders. In Group 2, suture bridge with knotless lateral row anchors was compared with double-row repair. In Group 3, suture bridge using standard lateral row anchors was compared with double-row repair. The contact conditions of the rotator cuff footprint were measured using pressure-sensitive film. There were no statistically significant differences between any of the techniques regarding contact area F(2, 15.7) = 3.09, P = 0.07 or mean contact pressure F(2, 15.1) = 2.35, P = 0.12. A post hoc power analysis suggests differences between techniques are likely less than 91-113 mm(2) for area and 0.071-0.089 N for pressure. The use of knotless anchors in the lateral row of a suture bridge repair did not increase the footprint contact area or contact pressure when compared to a suture bridge repair requiring knots laterally or to a double-row repair.

  5. Assessment and maintenance of a 15 year old stress-laminated timber bridge

    Treesearch

    T. Russell Gentry; Karl N. Brohammer; John Wells; James P. Wacker

    2006-01-01

    A timber bridge consisting of three 6.7 meter spans with a stress laminated deck was constructed in 1991 in the Spirit Creek State Forest near August, Georgia, USA. The stress laminated bridge uses a series of post-tensioning bars to hold the laminations together. The bridge remained in service until 2001 with no maintenance, at which time the bridge was inspected,...

  6. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Treesearch

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  7. Backwater effects of Piers in Subcritical Flow

    DOT National Transportation Integrated Search

    2001-10-01

    Construction or renovation of bridge structures may require placement of bridge piers within the channel or floodplain of natural waterways. These piers will obstruct the flow and may cause an increase in water levels upstream of the bridge structure...

  8. Investigation of cause of cracked stringer on the Blanchette Bridge.

    DOT National Transportation Integrated Search

    2006-10-05

    The Blanchette Bridge carries Interstate 70 across the Missouri River, connecting St. Louis and St. Charles : counties in eastern Missouri. The westbound bridge was constructed in 1958. In 1979, the original : reinforced concrete roadway deck on the ...

  9. Investigations of a precast bridge deck system.

    DOT National Transportation Integrated Search

    2010-07-01

    Improved methods of bridge deck construction are greatly needed. Bridge decks are often the first element to require repair or replacement because of its direct exposure to the elements and tire wear. This report presents a new precast overhang syste...

  10. Elevated temperature properties of weathering steel.

    DOT National Transportation Integrated Search

    2014-01-01

    In recent decades, bridge fires have become a major concern in the U.S. Fire hazard in bridges can result in significant economic and public losses. New construction of bridges often use Weathering Steel (also known as Corten Steel), whic...

  11. Rapid replacement/construction of bridges.

    DOT National Transportation Integrated Search

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  12. Integral abutment bridges under thermal loading : numerical simulations and parametric study.

    DOT National Transportation Integrated Search

    2016-06-01

    Integral abutment bridges (IABs) have become of interest due to their decreased construction and maintenance costs in : comparison to conventional jointed bridges. Most prior IAB research was related to substructure behavior, and, as a result, most :...

  13. Recommendations for design, construction, and maintenance of bridge approach slabs.

    DOT National Transportation Integrated Search

    2012-09-01

    Settlement and heave related movements of bridge approach slabs relative to bridge decks create a bump in : the roadway. Several problems arise from these bumps, which include poor riding conditions, potential : vehicle damage, loss of vehicle contro...

  14. 75 FR 54163 - Office of the Secretary: Renewal of the Lake Champlain Sea Lamprey Control Alternatives Workgroup

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... (Workgroup) for 2 years. The Workgroup provides an opportunity for stakeholders to give policy and technical advice on efforts to develop and implement sea lamprey control techniques alternative to lampricides in... Workgroup provides recommendations and advice to the Cooperative on: Feasible and appropriate sea lamprey...

  15. A Compendium of Air Force Institute of Technology Thesis Abstracts Related to Acquisition Management

    DTIC Science & Technology

    1990-09-01

    SHOULD PROGRAM DIRECTORS BE GRANTED CONTRACTING AUTHORITY? Champlain, George F. Sep 89 AD-A216 357 ABSTRACT: In Air Force Systems Command (AFSC...COMPETITIVE PRICES IN THE ACQUISITION OF WEAPON SYSTEM REPLENISHMENT SPARE PARTS. Brost , Edward J, Sep 82 AD-A122 962 ABSTRACT: Competition is the

  16. Landowner values, water quality, and recreation in the Lake Champlain Basin

    Treesearch

    Walter F. Kuentzel; Donald F. Dennis

    1998-01-01

    This study describes landowner values about water quality among resident landowners in the LaPlatte River watershed, tests whether suburbanization is producing a new mix of social values, analyzes the relationship between values and behaviors, and explores the link between recreation and water quality advocacy. Results showed that residents hold pro-environmental...

  17. Cartier, Champlain, and the fruits of the New World: botanical exchange in the 16th and 17th centuries.

    PubMed

    Dickenson, Victoria

    2008-01-01

    Much has been written of the Columbian exchange, the transfer between New World and Old of people, pathogens, flora and fauna. The biota of two hemispheres, once seemingly irredeemably separated, were interpenetrated, both through accident and through human agency. Part of this exchange involved medicinal and food plants, discovered in the New World and adopted into the Old. This paper examines the translation of a number of New World plants that were part of the 'Cartierian' or 'Champlinian' exchange that followed the voyages to North America by Jacques Cartier (1491-1557) between 1534 and 1541, and the explorations and settlements undertaken by Samuel de Champlain (1580?-1635) from 1603 to his death at Quebec in 1635. During this period, a number of North American plants were propagated in European nurseries and even found their way into everyday use in gardens or kitchens. How were these new plants viewed on their introduction and how were they incorporated into Europe's "vegetable" consciousness? Where did these new plants fit in the classification of the edible and the exotic?

  18. Knotless double-row SutureBridge rotator cuff repairs have improved self-reinforcement compared with double-row SutureBridge repairs with tied medial knots: a biomechanical study using an ovine model.

    PubMed

    Smith, Geoffrey C S; Bouwmeester, Theresia M; Lam, Patrick H

    2017-12-01

    In double-row SutureBridge (Arthrex, Naples, FL, USA) rotator cuff repairs, increasing tendon load may generate progressively greater compression forces at the repair footprint (self-reinforcement). SutureBridge rotator cuff repairs using tied horizontal mattress sutures medially may limit this effect compared with a knotless construct. Rotator cuff repairs were performed in 9 pairs of ovine shoulders. One group underwent repair with a double-row SutureBridge construct with tied horizontal medial-row mattress sutures. The other group underwent repair in an identical fashion except that medial-row knots were not tied. Footprint contact pressure was measured at 0° and 20° of abduction under loads of 0 to 60 N. Pull-to-failure tests were then performed. In both repair constructs, each 10-N increase in rotator cuff tensile load led to a significant increase in footprint contact pressure (P < .0001). The rate of increase in footprint contact pressure was greater in the knotless construct (P < .00022; ratio, 1.69). The yield point approached the ultimate load to failure more closely in the knotless model than in the knotted construct (P = .00094). There was no difference in stiffness, ultimate failure load, or total energy to failure between the knotless and knotted techniques. In rotator cuff repair with a double-row SutureBridge configuration, self-reinforcement is seen in repairs with and without medial-row knots. Self-reinforcement is greater with the knotless technique. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  19. 20. Photographic copy of the original construction drawing, 193031, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of the original construction drawing, 1930-31, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. Truss stress diagram, and plans of laterals and sway braces - Gasconade Bridge, Spanning Gasconade River at State Route 100, Gasconade, Gasconade County, MO

  20. 11. Photographic copy of lines drawing of original construction (24 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN

  1. 75 FR 4612 - Agency Information Collection Activities: Notice of Request for Extension of Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... construction time and traffic congestion; C. The development of engineering design criteria for innovative products, materials, and structural systems for use in highway bridges and structures; D. The reduction of... construction, repair, and rehabilitation of bridges and other highway structures. This program was funded by...

  2. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction measurements in deck segments.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, an extensive array of mechanical strain gage points were installed in sections of the box girders, pylons, and piers. At each instrumented box girder section, five longitudinal gages were plac...

  3. Latex and microsilica modified concrete bridge deck overlays in Oregon : final report.

    DOT National Transportation Integrated Search

    1997-05-01

    The final report presents information collected by ODOT personnel from bridge deck overlays constructed in Oregon between 1989 and 1995. Decks were placed on a variety of existing bridge types prepared using hydrodemolition, milling, and diamond grin...

  4. Corrosion resistance of grouted post-tensioning systems : [summary].

    DOT National Transportation Integrated Search

    2013-08-01

    The increased popularity of post-tensioned bridge construction in the United States has led to concerns about corrosion and its impact on the life cycle of these bridges. Although the vast majority of post-tensioned bridges in the United States have ...

  5. Fiberglass reinforced polymer composite bridge deck construction in Illinois

    DOT National Transportation Integrated Search

    2002-09-01

    An experiment was conducted using a fiber reinforced polymer composite material for the bridge deck of a low volume bridge. The test location was on South Fayette Street over the Town Brook in Jacksonville, Illinois. This project included removal of ...

  6. Integral abutment bridge for Louisiana's soft and stiff soils.

    DOT National Transportation Integrated Search

    2016-03-01

    Integral abutment bridges (IABs) have been designed and constructed in a few US states in the past few : decades. The initial purpose of building such bridges was to eliminate the expansion joints and resolve the : joint-induced problems. Although IA...

  7. Theoretical and field experimental evaluation of skewed modular slab bridges : [research summary].

    DOT National Transportation Integrated Search

    2012-12-01

    Adjacent precast, prestressed concrete multi-beam bridges have become more : prevalent due to their rapid construction time and cost effectiveness. Over the : years, various adjustments and refinements have been made to the design of : these bridges ...

  8. Effect of implementing lean-on bracing in skewed steel I-girder bridges.

    DOT National Transportation Integrated Search

    2016-09-01

    Skew of the supports in steel I-girder bridges cause undesirable torsional effects, increase cross-frame forces, and generally increase the difficulty of designing and : constructing a bridge. The girders experience differential deflections due to th...

  9. Concrete box-beam deterioration, phase II : appendices.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...

  10. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges.

    DOT National Transportation Integrated Search

    2004-10-01

    Continuity diaphragms used on skewed bents in prestressed girder bridges cause difficulties in detailing and : construction. Details for bridges with large diaphragm skew angles (>30) have not been a problem for LA DOTD. : However, as the skew angl...

  11. Innovative concrete bridging systems for pedestrian bridges : implementation and monitoring.

    DOT National Transportation Integrated Search

    2013-08-01

    Two precast, prestressed pedestrian bridges were designed for rapid construction in Rolla, MO, utilizing high-strength concrete (HSC) : and high-strength self-consolidating concrete (HS-SCC) with a target 28 day compressive strength of 68.9 MPa (10,0...

  12. Reflective Cracking between Precast Prestressed Box Girders

    DOT National Transportation Integrated Search

    2017-06-30

    The adjacent precast prestressed concrete box-beam bridge is the bridge of choice for short and short-to-medium span bridges. This choice is because of the ease of construction, favorable span-to-depth ratios, aesthetic appeal, and high torsional sti...

  13. Chapter 10:Hardwoods for timber bridges

    Treesearch

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  14. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Treesearch

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  15. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  16. Predicting minimum habitat characteristics for the Indiana bat in the Champlain Valley

    USGS Publications Warehouse

    Watrous, K.S.; Donovan, T.M.; Mickey, R.M.; Darling, S.R.; Hicks, A.C.; Von Oettingen, S. L.

    2006-01-01

    Predicting potential habitat across a landscape for rare species is extremely challenging. However, partitioned Mahalanobis D2 methods avoid pitfalls commonly encountered when surveying rare species by using data collected only at known species locations. Minimum habitat requirements are then determined by examining a principal components analysis to find consistent habitat characteristics across known locations. We used partitioned D 2 methods to examine minimum habitat requirements of Indiana bats (Myotis sodalis) in the Champlain Valley of Vermont and New York, USA, across 7 spatial scales and map potential habitat for the species throughout the same area. We radiotracked 24 female Indiana bats to their roost trees and across their nighttime foraging areas to collect habitat characteristics at 7 spatial scales: 1) roost trees, 2) 0.1-ha circular plots surrounding the roost trees, 3) home ranges, and 4-7) 0.5-km, 1-km, 2-km, and 3-km buffers surrounding the roost tree. Roost trees (n = 50) typically were tall, dead, large-diameter trees with exfoliating bark, located at low elevations and close to water. Trees surrounding roosts typically were smaller in diameter and shorter in height, but they had greater soundness than the roost trees. We documented 14 home ranges in areas of diverse, patchy land cover types that were close to water with east-facing aspects. Across all landscape extents, area of forest within roost-tree buffers and the aspect across those buffers were the most consistent features. Predictive maps indicated that suitable habitat ranged from 4.7-8.1% of the area examined within the Champlain Valley. These habitat models further understanding of Indiana bat summer habitat by indicating minimum habitat characteristics at multiple scales and can be used to aid management decisions by highlighting potential habitat. Nonetheless, information on juvenile production and recruitment is lacking; therefore, assessments of Indiana bat habitat quality in the region are still incomplete.

  17. Live-load performance evaluation of historic covered timber bridges in the United States

    Treesearch

    Junwon Seo; Travis K. Hosteng; Brent M. Phares; James P. Wacker

    2015-01-01

    The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), was established to preserve the covered timber bridge structures that were constructed in the early 1800s. Today, many of the approximately 880 covered timber bridges still in existence in the United States are closed to vehicular traffic;...

  18. Long-term performance monitoring of hardwood timber bridges in Pennsylvania

    Treesearch

    James P. Wacker; Carlito Calil; Lola E. Hislop; Paula D. Hilbrich Lee; James A. Kainz

    2004-01-01

    Several hardwood timber bridges were constructed in Pennsylvania during the early 1990s. This report summarizes the long-term field performance of seven stress-laminated deck bridges over a 4-year period beginning August 1997 and ending July 2001. Data collected include lumber moisture content, static load test deflection measurements, and bridge condition assessments...

  19. Building Bridges One Line at a Time

    ERIC Educational Resources Information Center

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  20. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION FROM WEST BANK LOOKING NORTH TOWARD EAST BANK DOWN RIVER SHOWING OVERALL VIEW OF BRIDGE PIER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  1. Hydraulic analysis, Paint Creek at State Route 772, Chillicothe, Ohio

    USGS Publications Warehouse

    Mayo, R.I.; Bartlett, W.P.

    1981-01-01

    The Ohio Department of Transportation, Division of Highways, proposes to replace a three-span arch, bridge across Paint Creek on South Paint Street in Chillicothe, Ohio with a new deck-type structure resting on four sets of piles and four piers. Profiles of the 10-, 25-, 50- and 100-year floods under present conditions and under conditions modified by constructions of the new bridge are presented in this report. The results indicate that the construction of the new bridge will not cause significant changes in the flood profiles or the areas inundated.

  2. The R/V Folger a Floating Laboratory: Teaching Marine Science Skills on Lake Champlain (Invited)

    NASA Astrophysics Data System (ADS)

    Manley, P.; Manley, T.

    2013-12-01

    Undergraduate senior work has been required at Middlebury College as far back as 1960's and hands-on experiential learning was and still is the mode for our geology courses. The history of Middlebury College having a research vessel started in the 1970's when Dave Folger started the marine component of our curriculum and obtained the first Middlebury College's research vessel - a coast guard rescue surf boat (Bruno Schmidt). The second Middlebury College research vessel, the R/V Baldwin was purchased in 1985 and was used exclusively in a river-like setting due to its open cockpit and minimal research equipment. In 1990, Middlebury College received a grant from NSF-MRI to upgrade the vessel, to a then state-of the-art small oceanographic vessel including new equipment (CTD, side-scan sonar, ROV, met station, coring devices, computers and navigation). Middlebury College contributed monies to enclose the wheelhouse, install safer diesel engines, as well as a winch and an A-frame to haul in equipment. Over 600+ students used the Baldwin in a variety of geology courses; mainly Oceanography and Marine Geology. In 2010, Middlebury College received an NSF -ARRA grant (American Recovery and Reinvestment Act) to replace the ailing R/V Baldwin with a floating state-of-the art laboratory with the specific goals of increasing 1) access to lake research for Middlebury faculty and students in the biological, chemical, and environmental sciences, 2) the scope of lake research by reducing transit times over this 100km long lake, 3) stability for broad-lake research, 4) improve and expand research capabilities on Lake Champlain, 5) the carrying capacity (both equipment and people), and 6) instructional capability and overnight capabilities. The newly built R/V Folger is a sophisticated research vessel with advanced capabilities that provides a greater capacity to the research infrastructure on Lake Champlain, enhancing interdisciplinary inquiry not only for Middlebury College, but for other members of the local educational community for the next 30 to 50 years. The R/V Folger hosts significant amount of lab space allowing for on-vessel processing of real time data, enhanced navigational capabilities, smart classroom technology and new instrumentation such as multi-beam and CTD-rosette system. This all aluminum new research vessel, besides providing a new platform for Middlebury College's students, will also be used to enable faculty at other local colleges to provide experiential training in research techniques that would otherwise be unavailable; provide research training to local K-12 teachers; offer outreach to "land-locked" institutions and organizations within our tri-state region (NY, NH and VT); the development of a nautical archaeology program in the Lake Champlain basin; and produce data with environmental benefits to the region.

  3. Investigation of techniques for accelerating the construction of bridge deck overlays : tech transfer summary.

    DOT National Transportation Integrated Search

    2016-04-01

    Todays environment is increasingly hostile to bridge decks with exposure : to deicing salts and environmental factors such as large temperature swings : and polluting chemicals. Being subjected to the most severe loading of all the : bridge compon...

  4. Feasibility of using shape memory alloys to develop self post-tensioned concrete bridge girders.

    DOT National Transportation Integrated Search

    2013-08-01

    Post-tensioned (PT) structural elements are used quite often in bridges due to their ability to span long widths : economically while providing an aesthetically pleasing structure. PT systems are also preferred in bridge construction : because they g...

  5. Evaluation of continuity detail for precast prestressed girders : research project capsule.

    DOT National Transportation Integrated Search

    2008-03-01

    The construction of a new bridge : crossing the Mississippi River north of : Baton Rouge is currently underway. The : project, named the John James : Audubon Bridge, is a true landmark. Its : main span will be the longest cablestayed : bridge in Nort...

  6. Forces in wingwalls from thermal expansion of skewed semi-integral bridges.

    DOT National Transportation Integrated Search

    2010-11-01

    Jointless bridges, such as semi-integral and integral bridges, have become more popular in recent years because of their simplicity in the construction and the elimination of high costs related to joint maintenance. Prior research has shown that skew...

  7. Lateral Bracing of Bridge Girders by Permanent Metal Deck Forms

    DOT National Transportation Integrated Search

    2005-01-10

    Lateral torsional buckling is a failure mode that often controls the design of steel bridge girders during construction. Bracing in the form of cross-frames and diaphragms are often provided at locations along the bridge length to reduce the unbraced...

  8. Pi'ilani Highway side on south side of island, Manawainui Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Pi'ilani Highway side on south side of island, Manawainui Bridge, constructed in 1993 to modern ASHTO standards; note difference in scale with historic Hana Belt Road bridges - Hana Belt Road, Between Haiku and Kaipahulu, Hana, Maui County, HI

  9. Evaluation of a bridge deck with CFRP prestressed panels under fatigue load cycles

    DOT National Transportation Integrated Search

    2003-09-01

    This report summarizes a study conducted under an IBRC (Innovative Bridge Research and Construction) project sponsored by the FHWA. In this project, a bridge deck with CFRP (carbon fiber reinforced polymeric) prestressed panels and cast-in-place topp...

  10. Fatigue study of a GRP pedestrian bridge : final report.

    DOT National Transportation Integrated Search

    1986-01-01

    Static and cyclic load tests were conducted on a 16-ft long bridge constructed with fiberglass materials. Approximately 1.6 million cycles of loads were applied to the deck to study the fatigue characteristics of the bridge. The location and magnitud...

  11. A survey of non-arched historic concrete bridges in Virginia constructed prior to 1950 : final report.

    DOT National Transportation Integrated Search

    1996-01-01

    Bridges are among the cultural resources that must be considered for historic significance under the Historic Preservation Act of 1966. The Virginia Transportation Research Council conducted pioneering studies of Virginia's early metal truss bridges ...

  12. Post-tensioning technologies.

    DOT National Transportation Integrated Search

    2013-04-01

    Posttensioned bridge construction has become increasingly popular and financially competitive with traditional prestressed concrete : and steel plate girder bridges. Unfortunately, Indiana has experienced several constructionrelated problems in...

  13. 77 FR 67563 - Regulated Navigation Area-New Haven Harbor, Quinnipiac River, Mill River, New Haven, CT; Pearl...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ...; Pearl Harbor Memorial Bridge (Interstate 95) Construction AGENCY: Coast Guard, DHS. ACTION: Final rule... construction of the new Pearl Harbor Memorial Bridge, and which could be needed at other times as well. This..., call or email Petty Officer Joseph Graun, Prevention Department, U.S. Coast Guard Sector Long Island...

  14. 77 FR 47331 - Regulated Navigation Area-New Haven Harbor, Quinnipiac River, Mill River, New Haven, CT; Pearl...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Harbor Memorial Bridge (Interstate 95) Construction AGENCY: Coast Guard, DHS. ACTION: Notice of proposed... needed during construction of the new Pearl Harbor Memorial Bridge, and which could be needed at other... Department, U. S. Coast Guard Sector Long Island Sound, (203) 468-4544, [email protected] ; or...

  15. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction period strains in cable stays.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, a number of the stays on the main span cantilever were instrumented with electrical resistance strain gages mounted directly on the wires of the seven-wire strands making up the stay cables. M...

  16. Field comparison of the installation and cost of placement of epoxy-coated and MMFX 2 steel deck reinforcement : establishing a baseline for future deck monitoring.

    DOT National Transportation Integrated Search

    2009-01-01

    As part of the Innovative Bridge Research and Construction Program (IBRCP), this study was conducted to use the full-scale construction project of the Route 123 Bridge over the Occoquan River in Northern Virginia to identify and compare any differenc...

  17. Building a Straw Bridge

    ERIC Educational Resources Information Center

    Teaching Science, 2015

    2015-01-01

    This project is for a team of students (groups of two or three are ideal) to design and construct a model of a single-span bridge, using plastic drinking straws as the building material. All steps of the design, construction, testing and critiquing stages should be recorded by students in a journal. Students may like to include labelled diagrams,…

  18. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    ERIC Educational Resources Information Center

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  19. 17. Baltimore through truss steel bridge (1905), built by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Baltimore through truss steel bridge (1905), built by the American Bridge Company. The bridge is 15 to 20 feet wide, with a wooden deck, and connects the Sullivan Machine Co. with the Foundry. The enclosed bridge in the background was constructed ca. 1920, and connects the Chain Machine Building with its power plant, foundry, and pattern shop. - Sullivan Machinery Company, Main Street between Pearl & Water Streets, Claremont, Sullivan County, NH

  20. Determining the Environmental Benefits of Ultra High Performance Concrete as a Bridge Construction Material

    NASA Astrophysics Data System (ADS)

    Lande Larsen, Ingrid; Granseth Aasbakken, Ida; O'Born, Reyn; Vertes, Katalin; Terje Thorstensen, Rein

    2017-10-01

    Ultra High Performance Concrete (UHPC) is a material that is attracting attention in the construction industry due to the high mechanical strength and durability, leading to structures having low maintenance requirements. The production of UHPC, however, has generally higher environmental impact than normal strength concrete due to the increased demand of cement required in the concrete mix. What is still not sufficiently investigated, is if the longer lifetime, slimmer construction and lower maintenance requirements lead to a net environmental benefit compared to standard concrete bridge design. This study utilizes life cycle assessment (LCA) to determine the lifetime impacts of two comparable highway crossing footbridges spanning 40 meters, designed respectively with UHPC and normal strength concrete. The results of the study show that UHPC is an effective material for reducing lifetime emissions from construction and maintenance of long lasting infrastructure, as the UHPC design outperforms the normal strength concrete bridge in most impact categories.

  1. 19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN

  2. Development and validation of a sensor-based health monitoring model for the Parkview Bridge deck.

    DOT National Transportation Integrated Search

    2012-01-31

    Accelerated bridge construction (ABC) using full-depth precast deck panels is an innovative technique that brings all : the benefits listed under ABC to full fruition. However, this technique needs to be evaluated and the performance of : the bridge ...

  3. Evaluation and analysis of decked bulb T beam bridges.

    DOT National Transportation Integrated Search

    2015-03-01

    A new corrosion-free decked bulb T beam bridge system has been developed to overcome some of the problems : associated with the construction of side-by-side box beam bridges such as the lack of inspection space between : beams and the longitudinal de...

  4. Serviceability-related issues for bridge live load deflection and construction closure pours.

    DOT National Transportation Integrated Search

    2015-06-01

    This study investigated the design criteria and practices in an effort to improve the quality of bridge designs in the : State of Maryland and beyond. This first criterion investigated was the live load deflection for steel bridges. The : second desi...

  5. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  6. Data collection and evaluation of continuity detail for John James Audubon Bridge No. 61390613004101.

    DOT National Transportation Integrated Search

    2014-10-01

    This report summarizes findings from monitoring data that was collected over a two-year period from Bridge No. : 61390613004101 in the John James Audubon Project, which was formerly designated as Bridge #2 prior to : construction completion. The brid...

  7. Serviceability-related issues for bridge live load deflection and construction closure pours : [research summary].

    DOT National Transportation Integrated Search

    2015-06-01

    The Load and Resistance Factor Design (LRFD) method has evolved to become a : more reliable approach to bridge design in the past century. Nevertheless, safety is : always the number one concern in the design of bridge structures. Equally important, ...

  8. 7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR

  9. 33 CFR 117.993 - Lake Champlain.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... on signal: (1) From June 15 through September 15: (i) Monday through Friday from 9 a.m. to 5 p.m... each of the drawbridges listed in this section must open as soon as possible for the passage of public... South Hero Island and North Hero Island, shall operate as follows: (1) The draw shall open on signal on...

  10. 33 CFR 117.993 - Lake Champlain.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... on signal: (1) From June 15 through September 15: (i) Monday through Friday from 9 a.m. to 5 p.m.: (ii) Saturdays, Sundays, Independence Day and Labor Day from 7 a.m. to 11 p.m.; (iii) At all other times, if at least two hours notice is given. (2) From September 16 through June 14, if at least 24...

  11. The Assessment of Public Issue Perception: Exploration of a Three-Tiered, Social-Network Based Methodology in the Champlain Basin.

    ERIC Educational Resources Information Center

    Gore, Peter H.; And Others

    Design, application, and interpretation of a three-tiered sampling framework as a strategy for eliciting public participation in planning and program implementation is presented, with emphasis on implications for federal programs which mandate citizen participation (for example, Level B planning of Water Resources Planning Act, Federal Water…

  12. Final report for Verglimit at hole-in-the-wall slide section : experimental feature evaluation.

    DOT National Transportation Integrated Search

    1989-06-01

    In 1983, experimental Verglimit overlays were placed on two Oregon bridges known to have icing problems. The performance of the test overlays, constructed on the Salmon River Bridge in Clackamas County and the Quartz Creek Bridge in Clatsop County, w...

  13. Development and validation of a sensor-based health monitoring model for the Parkview Bridge deck : [appendices].

    DOT National Transportation Integrated Search

    2012-01-31

    Accelerated bridge construction (ABC) using full-depth precast deck panels is an innovative technique that brings all the benefits listed under ABC to full fruition. However, this technique needs to be evaluated and the performance of the bridge need...

  14. Bridge-in-a-Backpack(TM). Task 1 : investigation of span lengths up to 70 feet.

    DOT National Transportation Integrated Search

    2011-08-01

    The Bridge-in-a-Backpack has previously been demonstrated with short spans. The first : constructed one, Neal Bridge in Pittsfield, Maine had a span of 34 feet. This task includes : research and development that demonstrates the technology can be ...

  15. Evaluation of a Highway Bridge Constructed Using High Strength Lightweight Concrete Bridge Girders : final report.

    DOT National Transportation Integrated Search

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  16. 32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  17. Implementation of a Precast Inverted T-Beam System in Virginia: Part I : Laboratory Investigations

    DOT National Transportation Integrated Search

    2017-10-01

    The inverted T-beam system provides an accelerated bridge construction alternative for short-to-medium-span bridges. The system consists of adjacent precast inverted T-beams with a cast-in-place concrete topping. This bridge system is not expected to...

  18. Quantification of cracks in concrete bridge decks in Ohio District 3.

    DOT National Transportation Integrated Search

    2012-02-01

    The development of cracks in reinforced bridge decks is a critical problem, not only in Ohio state, but the whole of United States. Many bridge decks constructed within the last 10 years in Ohio have already shown varying levels and patterns of crack...

  19. Quantification of cracks in concrete bridge decks in Ohio district 3.

    DOT National Transportation Integrated Search

    2012-02-01

    The development of cracks in reinforced bridge decks is a critical problem, not only in Ohio state, but the whole of United States. Many bridge decks constructed within the last 10 years in Ohio have already shown varying levels and patterns of crack...

  20. Hardwoods for timber bridges : a national program emphasis by the USDA Forest Service

    Treesearch

    James P. Wacker; Ed Cesa

    2005-01-01

    This paper describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  1. 78 FR 7670 - Safety Zone; Indian Street Bridge Construction, St. Lucie Canal, Palm City, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... 1625-AA00 Safety Zone; Indian Street Bridge Construction, St. Lucie Canal, Palm City, FL AGENCY: Coast... zone on the St. Lucie Canal, Palm City, Florida to provide for the safety of life and vessels on a... on a narrow waterway. The temporary safety zone encompasses all waters of the St. Lucie Canal in the...

  2. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  3. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  4. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  5. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION LOOKING SOUTH FROM EAST BANK TOWARD WEST BANK SHOWING COMPLETED STEEL RAIL SECTION AND PART OF BRIDGE DECK TRUSS UNDER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. Importance of Topographic Features and Tactical Annotations on Maps Used by Army Aviators for Nap-of-the-Earth Flight.

    DTIC Science & Technology

    1982-01-01

    real word but, instead, are sk-bematic diagrams - stylized, simplified, generalized, and codified presentations of a selected sample of some of the...Turntable/ Roundhouse 3.53 3 Drydock 3.44 7 Barn/Shed 3.41 2 Tailings/Slag Dumps 3.34 5 Bridge Construction Type 3.20 24 Road Name/Number 3.18 7 Bridge...Shaft Mine 3.58 Stockyard 3.54 Turntable/ Roundhouse 3.53 Drydock 3.44 Barn/Shed 3.41 j Tailings/Slag Dumps 3.34 Bridge Construction Type 3.20 Road

  7. Design, construction and load testing of the bridge on Arnault Branch, Washington County, Missouri using innovative technologies.

    DOT National Transportation Integrated Search

    2010-02-01

    The superstructure and instrumentation designs of a three-span bridge are presented in this report. The three spans include a : precast box-girder bridge, a precast deck on steel girder and a precast deck on concrete girder. They were designed to com...

  8. 8. Copyphoto of 1934 aerial photo, view to the east, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Copy-photo of 1934 aerial photo, view to the east, by the U.S. Army Air Corps, showing bridge tender's station and Mud Bayou Railway Bridge under construction - High Island Bridge Tender's Station, State Highway 124 Crossing of Mud Bayou, High Island, Galveston County, TX

  9. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  10. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  11. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  12. Condition assessment and methods of abatement of prestressed concrete box-beam deterioration, phase II : volume 1.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on : public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for : LIFE program. Further, fail...

  13. Evaluation of Erection Procedures of the Horizontally Curved Steel I-Girder Ford City Veterans Bridge

    DOT National Transportation Integrated Search

    2002-03-06

    In the case of horizontally steel curved I-girder bridges, it is important to carefully analyze the erection sequence of the superstructure so as to ensure that difficulties do not arise in the field during construction of the bridge. Generally, prob...

  14. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who reviews bridge inspection reports? 170.507 Section 170.507 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge...

  15. Condition assessment and methods of abatement of prestressed concrete box-beam deterioration, phase II : volume 2.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...

  16. 37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON THIRD PANEL OF NORTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  17. 31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INITIAL CONSTRUCTION ON SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  18. 40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF NORTH ARM, FROM SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  19. 34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON EIGHT PANEL OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  20. 33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  1. 19. Photocopy of Blueprint (Original blueprint located in Grays Harbor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of Blueprint (Original blueprint located in Grays Harbor County Bridge File No. 4731/0.5 COAST BRIDGE COMPANY'S CONSTRUCTION BLUEPRINT OF 'FLOOR SYSTEM FOR 120' RIVETED SPAN' DATED JULY 1915 - West Wishkah Bridge, West Wishkah Road Spanning Wishkah River Middle Fork, Aberdeen, Grays Harbor County, WA

  2. Structural health monitoring of I-10 twin span bridge - part I : analysis of lateral load test.

    DOT National Transportation Integrated Search

    2014-11-01

    The old I-10 Twin Span Bridge over Lake Pontchartrain was heavily damaged by the storm surges during : Hurricane Katrina in 2005. A new 5.4-mile long replacement bridge was constructed with higher resistance to : extreme events, such as storm surges ...

  3. 0-6652 : spliced Texas girder bridges.

    DOT National Transportation Integrated Search

    2015-02-01

    Spliced girder technology continues to attract : attention due to its versatility over traditional : prestressed concrete highway bridge construction. : By joining multiple precast concrete girders using : post-tensioning, spliced girder technology :...

  4. Development and Field Testing of a Model to Simulate a Demonstration of Le Chatelier's Principle Using the Wheatstone Bridge Circuit.

    ERIC Educational Resources Information Center

    Vickner, Edward Henry, Jr.

    An electronic simulation model was designed, constructed, and then field tested to determine student opinion of its effectiveness as an instructional aid. The model was designated as the Equilibrium System Simulator (ESS). The model was built on the principle of electrical symmetry applied to the Wheatstone bridge and was constructed from readily…

  5. Government's Construction of the Relation between Parents and Schools in the Upbringing of Children in England: 1963-2009

    ERIC Educational Resources Information Center

    Bridges, David

    2010-01-01

    In this essay David Bridges argues that since most families choose to realize their responsibility for the major part of their children's education through state schools, then the way in which the state constructs parents' relation with these schools is one of its primary levers on parenting itself. Bridges then examines the way in which…

  6. The Battle of Bennington: An American Victory. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Hunter, Kathleen

    During the summer of 1777 the British undertook an ambitious campaign to isolate New England from the rest of the colonies. For two months General John Burgoyne led his army down the Lake Champlain-Hudson River toward Albany (New York) with apparent ease, but he then found he needed provisions, wagons, cattle, and horses for his army. He sent an…

  7. Progressive Approaches to University-Community Relations: The Town-Gown Story in Burlington

    ERIC Educational Resources Information Center

    Clavelle, Peter

    2001-01-01

    The City of Burlington (population 40,000) is home to the University of Vermont (UVM), Champlain College and Burlington College. UVM alone enrolls some 7,300 undergraduate students and almost 9,000 students overall. With the university just a half-mile up the hill from the city center, Burlington's urban amenities--its arts and culture,…

  8. A Multiscale Mapping Assessment of Lake Champlain Cyanobacterial Harmful Algal Blooms

    PubMed Central

    Torbick, Nathan; Corbiere, Megan

    2015-01-01

    Lake Champlain has bays undergoing chronic cyanobacterial harmful algal blooms that pose a public health threat. Monitoring and assessment tools need to be developed to support risk decision making and to gain a thorough understanding of bloom scales and intensities. In this research application, Landsat 8 Operational Land Imager (OLI), Rapid Eye, and Proba Compact High Resolution Imaging Spectrometer (CHRIS) images were obtained while a corresponding field campaign collected in situ measurements of water quality. Models including empirical band ratio regressions were applied to map chlorophyll-a and phycocyanin concentrations; all sensors performed well with R2 and root-mean-square error (RMSE) ranging from 0.76 to 0.88 and 0.42 to 1.51, respectively. The outcomes showed spatial patterns across the lake with problematic bays having phycocyanin concentrations >25 µg/L. An alert status metric tuned to the current monitoring protocol was generated using modeled water quality to illustrate how the remote sensing tools can inform a public health monitoring system. Among the sensors utilized in this study, Landsat 8 OLI holds the most promise for providing exposure information across a wide area given the resolutions, systematic observation strategy and free cost. PMID:26389930

  9. Small-scale lacustrine drifts in Lake Champlain, Vermont

    USGS Publications Warehouse

    Manley, Patricia L.; Manley, T.O.; Hayo, Kathryn; Cronin, Thomas

    2012-01-01

    High resolution CHIRP (Compressed High Intensity Radar Pulse) seismic profiles reveal the presence of two lacustrine sediment drifts located in Lake Champlain's Juniper Deep. Both drifts are positive features composed of highly laminated sediments. Drift B sits on a basement high while Drift A is built on a trough-filling acoustically-transparent sediment unit inferred to be a mass-transport event. These drifts are oriented approximately north–south and are parallel to a steep ridge along the eastern shore of the basin. Drift A, located at the bottom of a structural trough, is classified as a confined, elongate drift that transitions northward to become a system of upslope asymmetric mudwaves. Drift B is perched atop a structural high to the west of Drift A and is classified as a detached elongate drift. Bottom current depositional control was investigated using Acoustic Doppler Current Profilers (ADCPs) located across Drift A. Sediment cores were taken at the crest and at the edges of the Drift A and were dated. Drift source, deposition, and evolution show that these drifts are formed by a water column shear with the highest deposition occurring along its crest and western flank and began developing circa 8700–8800 year BP.

  10. Microdevelopment during an activity-based science lesson

    NASA Astrophysics Data System (ADS)

    Parziale, Jim

    1997-11-01

    The purpose of this study was to describe the microdevelopment of task-related skills during a classroom science activity. Pairs of fifth and pairs of seventh grade students were videotaped as they constructed marshmallow and toothpick bridges. A skill theory based system of analysis was developed and used to detect the construction of new understandings. Patterns of change observed in these understandings were used to infer three means of self-construction: shifts of focus, bridging mechanisms and distributed cognition. Shift of focus is a mechanism used by students to efficiently explore a web of possibilities, collect ideas and make observations for later coordination as new understandings. Bridging mechanisms are partially built conversational structures that scaffolded the construction of higher level thinking structures. Students used the distributed cognition mechanism to test the adaptiveness of their design ideas without the need to fully coordinate an understandings of these designs. An integrated model of these three mechanisms is proposed specific to this task. This model describes how these mechanisms spontaneously emerged and interacted to support the construction of mental representations.

  11. Design Optimization of Hybrid FRP/RC Bridge

    NASA Astrophysics Data System (ADS)

    Papapetrou, Vasileios S.; Tamijani, Ali Y.; Brown, Jeff; Kim, Daewon

    2018-04-01

    The hybrid bridge consists of a Reinforced Concrete (RC) slab supported by U-shaped Fiber Reinforced Polymer (FRP) girders. Previous studies on similar hybrid bridges constructed in the United States and Europe seem to substantiate these hybrid designs for lightweight, high strength, and durable highway bridge construction. In the current study, computational and optimization analyses were carried out to investigate six composite material systems consisting of E-glass and carbon fibers. Optimization constraints are determined by stress, deflection and manufacturing requirements. Finite Element Analysis (FEA) and optimization software were utilized, and a framework was developed to run the complete analyses in an automated fashion. Prior to that, FEA validation of previous studies on similar U-shaped FRP girders that were constructed in Poland and Texas is presented. A finer optimization analysis is performed for the case of the Texas hybrid bridge. The optimization outcome of the hybrid FRP/RC bridge shows the appropriate composite material selection and cross-section geometry that satisfies all the applicable Limit States (LS) and, at the same time, results in the lightest design. Critical limit states show that shear stress criteria determine the optimum design for bridge spans less than 15.24 m and deflection criteria controls for longer spans. Increased side wall thickness can reduce maximum observed shear stresses, but leads to a high weight penalty. A taller cross-section and a thicker girder base can efficiently lower the observed deflections and normal stresses. Finally, substantial weight savings can be achieved by the optimization framework if base and side-wall thickness are treated as independent variables.

  12. Load response and gap formation in a single-row cruciate suture rotator cuff repair.

    PubMed

    Huntington, Lachlan; Richardson, Martin; Sobol, Tony; Caldow, Jonathon; Ackland, David C

    2017-06-01

    Double-row rotator cuff tendon repair techniques may provide superior contact area and strength compared with single-row repairs, but are associated with higher material expenses and prolonged operating time. The purpose of this study was to evaluate gap formation, ultimate tensile strength and stiffness of a single-row cruciate suture rotator cuff repair construct, and to compare these results with those of the Mason-Allen and SutureBridge repair constructs. Infraspinatus tendons from 24 spring lamb shoulders were harvested and allocated to cruciate suture, Mason-Allen and SutureBridge repair groups. Specimens were loaded cyclically between 10 and 62 N for 200 cycles, and gap formation simultaneously measured using a high-speed digital camera. Specimens were then loaded in uniaxial tension to failure, and construct stiffness and repair strength were evaluated. Gap formation in the cruciate suture repair was significantly lower than that of the Mason-Allen repair (mean difference = 0.6 mm, P = 0.009) and no different from that of the SutureBridge repair (P > 0.05). Both the cruciate suture repair (mean difference = 15.7 N/mm, P = 0.002) and SutureBridge repair (mean difference = 15.8 N/mm, P = 0.034) were significantly stiffer than that of the Mason-Allen repair; however, no significant differences in ultimate tensile strength between repair groups were discerned (P > 0.05). The cruciate suture repair construct, which may represent a simple and cost-effective alternative to double-row and double-row equivalent rotator cuff repairs, has comparable biomechanical strength and integrity with that of the SutureBridge repair, and may result in improved construct longevity and tendon healing compared with the Mason-Allen repair. © 2017 Royal Australasian College of Surgeons.

  13. Collision loads on bridge piers : phase 2, report of guidelines for designing bridge piers and abutments for vehicle collisions

    DOT National Transportation Integrated Search

    2011-03-01

    An instrumented, simulated bridge pier was constructed, and two full-scale collisions with an : 80,000-lb van-type tractor-trailer were performed on it. The trailer was ballasted with bags of sand on : pallets. The simulated pier was 36 inches in dia...

  14. Bulb-T beams with self-consolidating concrete on the Route 33 bridge over the Pamunkey River in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    This study evaluated the bulb-T beams made with self-consolidating concrete (SCC) used in the Route 33 Bridge over the Pamunkey River at West Point, Virginia. Before the construction of the bridge, two test beams with SCC similar in cross section to ...

  15. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  16. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  17. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  18. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  19. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  20. 38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). VIEW FROM CANYON OF THIRD PANEL OF NORTH ARM UNDER CONSTRUCTION. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  1. 35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ELEVENTH (LAST) PANEL OF SOUTH ARM UNDER CONSTRUCTION, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  2. Standard plans for southern pine bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; M. H. Triche

    1995-01-01

    The development of standardized timber bridge plans and specifications is a key element in improving design and construction practices. The bridge plans presented were developed as a cooperative effort between the USDA Forest Service, Forest Products Laboratory (FPL); the University of Alabama; and the Southern Pine Council and are the first step in developing...

  3. 7. Historic American Buildings Survey W. N. Manning, Photographer, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Historic American Buildings Survey W. N. Manning, Photographer, January 5, 1935 VIEW SHOWING INNER CONSTRUCTION OF BRIDGE - Covered Bridge, Spanning Choccolocco Creek , Old Eastaboga, Talladega County, AL

  4. 2. Historic American Buildings Survey W. N. Manning, Photographer, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Historic American Buildings Survey W. N. Manning, Photographer, January 5, 1935 VIEW SHOWING UNDER CONSTRUCTION OF BRIDGE - Covered Bridge, Spanning Choccolocco Creek , Old Eastaboga, Talladega County, AL

  5. Five-year clinical evaluation of zirconia-based bridges in patients in UK general dental practices.

    PubMed

    Burke, F J T; Crisp, R J; Cowan, A J; Lamb, J; Thompson, O; Tulloch, N

    2013-11-01

    This study reported the results at 5 years of fixed-fixed all-ceramic bridges, constructed in a yttria oxide stabilized tetragonal zirconium oxide polycrystal (Y-TZP) substructure, placed in adult patients in UK general dental practices. Four UK general dental practitioners recruited patients who required fixed bridgework and, after obtaining informed written consent, appropriate clinical and radiographic assessments were completed. The teeth were prepared and bridges constructed in accordance with the manufacturer's instructions. Each bridge was reviewed annually within 3 months of the anniversary of its placement by a calibrated examiner, together with the clinician who had placed the restoration, using modified USPHS criteria. Of the 41 bridges originally placed, 33 bridges were examined at 5 years. All Y-TZP frameworks were intact and no bridge retainers had debonded. Eight chipping fractures in the veneering ceramic were noted over the 5-year period. In five cases the patients were unaware of these and these cases were polished. Of the remaining three cases, in one a repair was attempted but was unsuccessful, but the bridge remained in satisfactory service. However, in the case involving a chipping fracture of the mesial-incisal angle of a central incisor, it was considered that replacement of the bridge was necessary. 97% (n=32) of the 33 Lava Y-TZP fixed-fixed bridges, evaluated in patients attending UK general dental practices, were found to be performing satisfactorily. The use of Y-TZP frameworks holds promise. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. The future of rapid bridge deck replacement.

    DOT National Transportation Integrated Search

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  7. Key Royale bridge five year evaluation.

    DOT National Transportation Integrated Search

    2013-06-01

    This report describes the design, construction, instrumentation, and five-year evaluation of the Key Royale Bridge substructure. The primary focus was the evaluation of the implementation of highly reactive supplementary cementitious materials (SCM) ...

  8. 20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION BRIDGE, GANTRY CRANE AND STRUCTURAL PIERS. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  9. Synthesis of concrete bridge piles prestressed with CFRP systems.

    DOT National Transportation Integrated Search

    2017-06-01

    The Texas Department of Transportation frequently constructs prestressed concrete piles for use in bridge : foundations. Such prestressed concrete piles are typically built with steel strands that are highly susceptible to : environmental degradation...

  10. Optimizing Mississippi aggregates for concrete bridge decks.

    DOT National Transportation Integrated Search

    2012-12-01

    AASHTO M 43 Standard Specification for Sizes of Aggregate for Road and Bridge Construction : addresses particle size distribution of material included in various maximum nominal size aggregates. This : particle size distribution requires additi...

  11. Shrinkage and durability study of bridge deck concrete.

    DOT National Transportation Integrated Search

    2010-12-01

    The Mississippi Department of Transportation is incorporating changes to material : specifications and construction procedures for bridge decks in an effort to reduce shrinkage : cracking. These changes are currently being implemented into a limited ...

  12. 23 CFR 630.803 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...

  13. 23 CFR 630.803 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...

  14. Longer Lasting Bridge Deck Overlays

    DOT National Transportation Integrated Search

    2018-04-01

    The objective of this report is to determine the most effective method for bridge deck overlay construction and repair by assessing current practices; examining new products and technologies; and reviewing NCHRP (National Cooperative Highway Research...

  15. Covered Bridge Security Manual

    Treesearch

    Brett Phares; Terry Wipf; Ryan Sievers; Travis Hosteng

    2013-01-01

    The design, construction, and use of covered timber bridges is all but a lost art in these days of pre-stressed concrete, high-performance steel, and the significant growth both in the volume and size of vehicles. Furthermore, many of the existing covered timber bridges are preserved only because of their status on the National Registry of Historic Places or the...

  16. Kings Covered Bridge rehabilitation, Somerset County, PA

    Treesearch

    William J. Collins; David C. Fischetti; Arnold M. Jr. Graton; Len Lichvar; Branden Diehl; James P. Wacker; Ed Cesa; Ed Stoltz; Emory L. Kemp; Samer H. Petro; Leon Buckwalter; John McNamara

    2005-01-01

    Kings Covered Bridge over Laurel Creek in Somerset County, Pennsylvania is approximately 114-foot clear span multiple Kingpost Truss with nail-laminated arches. This timber bridge is historically significant because it retains its original features of the 1860’s since the 1930s when it was spared from modernization by the construction of an adjacent steel highway...

  17. Field performance of stress-laminated highway bridges constructed with glued laminated timber

    Treesearch

    J.P. Wacker

    2004-01-01

    This paper summarizes the field performance of three stress-laminated deck timber bridges located in Wisconsin, New York, and Arizona. The deck superstructures of these single-span highway bridges is comprised of full-span glued laminated timber (glulam) beam laminations manufactured with southern pine, hem fir/red maple combination, and/or Douglas fir lumber species....

  18. Construction machine control guidance implementation strategy.

    DOT National Transportation Integrated Search

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  19. Best Practices for Construction and Repair of Bridge Approaches and Departures

    DOT National Transportation Integrated Search

    2018-03-01

    Florida Department of Transportation (FDOT) has experienced frequent distresses in bridge approach/departure asphalt pavements in its highway system. Commonly observed distresses include alligator cracking and rutting, which reduce roadway smoothness...

  20. 12. VIEW, LOOKING NORTH, SHOWING CABLEWAY AND TRAM ABOVE AN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW, LOOKING NORTH, SHOWING CABLEWAY AND TRAM ABOVE AN ARCH UNDER CONSTRUCTION, WITH RAILROAD BRIDGE IN BACKGROUND - Cotter Bridge, Spanning White River at U.S. Highway 62, Cotter, Baxter County, AR

Top