Sample records for closeout operations facility

  1. Closeout of IE Bulletin 83-06: Nonconforming materials supplied by Tube-Line Corporation Facilities at Long Island City, New York; Houston, Texas; and Carol Stream, Illinois

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dean, R.S.; Foley, W.J.; Hennick, A.

    1989-05-01

    Documentation is provided in this report for the closeout of IE Bulletin 83-06 regarding nonconformities of certain materials which were obtained directly or indirectly from the Tube-Line Corporation (T-L) for use in safety-related systems. Closeout is based on the implementation and verification of four (4) required actions by licensees and holders of construction permits of nuclear power reactor and nuclear fuel facilities. From evaluation of responses and NRC/Region inspection reports, it is concluded that the concerns of the bulletin have been resolved. The bulletin is closed for all of the 120 power reactor facilities and for both of the twomore » nuclear fuel facilities to which it was issued for action. Background information is supplied in the Introduction and Appendix A. 3 refs., 5 tabs.« less

  2. User Charge Revenues for Wastewater Treatment Plants--Insufficient to Cover Operation and Maintenance.

    DTIC Science & Technology

    1981-12-02

    audits of construction grants, a review of user charge system adequacy, including a review of the adequacy of reserve accounts for replacing major...recommendation to incorporate, as part of existing operation and and maintenance inspections and closeout financial audits of construction grants, a...determination to be made in an audit is whether the facility was constructed in conformance with approved plans and specifications and whether it meets

  3. 25 CFR 170.474 - Who conducts the project closeout?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who conducts the project closeout? 170.474 Section 170.474 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  4. Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-109

    NASA Technical Reports Server (NTRS)

    Oliu, Armando

    2005-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

  5. Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-110

    NASA Technical Reports Server (NTRS)

    Oliu, Armando

    2005-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

  6. Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-105

    NASA Technical Reports Server (NTRS)

    Oliu, Armando

    2005-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

  7. Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-104

    NASA Technical Reports Server (NTRS)

    Oliu, Armando

    2005-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

  8. Debris/Ice/TPS Assessment and Integrated Photographic Analysis of Shuttle Mission STS-108

    NASA Technical Reports Server (NTRS)

    Oliu, Armando

    2005-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center Photo/Video Analysis, reports from Johnson Space Center and Marshall Space Flight Center are also included in this document to provide an integrated assessment of the mission.

  9. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)« less

  10. Debris/ice/TPS assessment and integrated photographic analysis for Shuttle Mission STS-45

    NASA Technical Reports Server (NTRS)

    Katnik, Gregory N.; Higginbotham, Scott A.; Davis, J. Bradley

    1992-01-01

    The Debris Team has developed and implemented measures to control damage from debris in the Shuttle operational environment and to make the control measures a part of routine launch flows. These measures include engineering surveillance during vehicle processing and closeout operations, facility and flight hardware inspections before and after launch, and photographic analysis of mission events. Photographic analyses of mission imagery from launch, on-orbit, and landing provide significant data in verifying proper operation of systems and evaluating anomalies. In addition to the Kennedy Space Center (KSC) Photo/Video Analysis, reports from Johnson Space Center, Marshall Space Flight Center, and Rockwell International-Downey are also included to provide an integrated assessment of each Shuttle mission.

  11. Mars Science Laboratory Rover Closeout

    NASA Image and Video Library

    2011-11-10

    The Mars Science Laboratory mission rover, Curiosity, is prepared for final integration into the complete NASA spacecraft in this photograph taken inside the Payload Hazardous Servicing Facility at NASA Kennedy Space Center, Fla.

  12. Inside NuSTAR Nose Cone

    NASA Image and Video Library

    2012-03-02

    A spacecraft technician is performing closeout work inside the fairing that will be installed around NASA Nuclear Spectroscopic Telescope Array NuSTAR spacecraft in a processing facility at Vandenberg Air Force Base in California.

  13. Use of Information Technology for Management of U.S. Postal Service Facilities.

    DTIC Science & Technology

    1996-05-01

    change closeout status, request for proposal log) Projected income and expenses of a U.S. Postal Service facility Direct capitalization model Tax...Unclassified 19. SECURITY CLASSIFICATION OF ABSTRACT Unclassified 15. NUMBER OF PAGES 107 16. PRICE CODE 20. LIMITATION OF ABSTRACT UL NSN 7540-01...time and at the right price is a huge and complex job. In any one year, the USPS Facilities organization may acquire more than 100 sites, plan

  14. 77 FR 37248 - Delegations of Authority for the Office of Housing-Federal Housing Administration (FHA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...

  15. Superfund TIO videos: Set A. Settlement tools and practices, win-win negotiations, closeout, records management, authorities and liabilities. Part 5. Audio-Visual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    The videotape is divided into 5 sections. Section 1 provides an overview of settlement activities including conducting an information exchange, issuing general notice letters, initiating special notice procedures, receiving good faith offers (GFO), negotiating and settlements, and pursuing enforcement actions. Section 2 covers the types of negotiations that commonly involve OSCs and RPMs. The characteristics of a negotiating style that satisfy all the parties as well as methods for preparing and conducting this type of negotiation are outlined. Section 3 deals with post-removal site control arrangements and other closeout requirements for a removal site, such as completing necessary paperwork. Themore » remedial project closeout procedures also are covered, including the remedial closeout report, operation and maintenance (O M) arrangements, transfer of site responsibility, and deletion from the National Priorities List (NPL). Section 4 discusses the purpose, procedures, roles and responsibilities associated with records management under Superfund. Section 5 outlines the response authority provided by CERCLA to OCSs and RPMs.« less

  16. A Clean Bill of Health.

    ERIC Educational Resources Information Center

    American School & University, 1998

    1998-01-01

    Explores the steps to take to reduce the likelihood that indoor-air-quality (IAQ) problems will develop in educational facilities. Highlights sources and hazards of IAQ when renovating buildings; control strategies and the establishment of IAQ close-out criteria for all renovation projects; heating, ventilation, and air-conditioning system…

  17. Report: Close-Out of Hotline Complaint on Unreasonable Cost Increase to the Wastewater Treatment Facility Improvements, Perkins, Oklahoma

    EPA Pesticide Factsheets

    Report #12-X-0161, December 29, 2011. We have closed a hotline complaint that project costs increased unreasonably due to American Recovery and Reinvestment Act of 2009 (Recovery Act) requirements because we found no evidence to support the complaint.

  18. Sustaining and Extending the Open Science Grid: Science Innovation on a PetaScale Nationwide Facility (DE-FC02-06ER41436) SciDAC-2 Closeout Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Livny, Miron; Shank, James; Ernst, Michael

    Under this SciDAC-2 grant the project’s goal w a s t o stimulate new discoveries by providing scientists with effective and dependable access to an unprecedented national distributed computational facility: the Open Science Grid (OSG). We proposed to achieve this through the work of the Open Science Grid Consortium: a unique hands-on multi-disciplinary collaboration of scientists, software developers and providers of computing resources. Together the stakeholders in this consortium sustain and use a shared distributed computing environment that transforms simulation and experimental science in the US. The OSG consortium is an open collaboration that actively engages new research communities. Wemore » operate an open facility that brings together a broad spectrum of compute, storage, and networking resources and interfaces to other cyberinfrastructures, including the US XSEDE (previously TeraGrid), the European Grids for ESciencE (EGEE), as well as campus and regional grids. We leverage middleware provided by computer science groups, facility IT support organizations, and computing programs of application communities for the benefit of consortium members and the US national CI.« less

  19. Guide to DCP Study Close-Out: Milestones and Tasks | Division of Cancer Prevention

    Cancer.gov

    This guide assists Consortium Lead Organization (CLO) planning for DCP study close-out. Study close-out tasks are organized under milestones, which help mark progress toward completion of the close-out process. Once tasks associated with a milestone are underway, planning for the next milestone may begin. Click on a milestone to view the associated close-out tasks. |

  20. 7 CFR 1726.401 - Material contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.401 Material contract closeout. (a) Delivery inspection. The borrower (acting through its engineer, if applicable) will... applicable specifications. (b) Closeout documents. The borrower (acting through its engineer, if applicable...

  1. 7 CFR 1726.401 - Material contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.401 Material contract closeout. (a) Delivery inspection. The borrower (acting through its engineer, if applicable) will... applicable specifications. (b) Closeout documents. The borrower (acting through its engineer, if applicable...

  2. 7 CFR 1726.401 - Material contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.401 Material contract closeout. (a) Delivery inspection. The borrower (acting through its engineer, if applicable) will... applicable specifications. (b) Closeout documents. The borrower (acting through its engineer, if applicable...

  3. 7 CFR 1726.401 - Material contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.401 Material contract closeout. (a) Delivery inspection. The borrower (acting through its engineer, if applicable) will... applicable specifications. (b) Closeout documents. The borrower (acting through its engineer, if applicable...

  4. 7 CFR 1726.401 - Material contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.401 Material contract closeout. (a) Delivery inspection. The borrower (acting through its engineer, if applicable) will... applicable specifications. (b) Closeout documents. The borrower (acting through its engineer, if applicable...

  5. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  6. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  7. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  8. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  9. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  10. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  11. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  12. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  13. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  14. 24 CFR 570.464 - Project closeout.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project closeout. 570.464 Section 570.464 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Project closeout. HUD will advise the recipient to initiate closeout procedures when HUD determines, in...

  15. Development of sputtered techniques for thrust chambers, task 1. [evaluation of filler materials for regeneratively cooled thrust chambers

    NASA Technical Reports Server (NTRS)

    Mullaly, J. R.; Schmid, T. E.; Hecht, R. J.

    1974-01-01

    Filler materials proposed for use in the sputter fabrication regeneratively cooled thrust chambers were evaluated. Low melting castable alloys, CERROBEND. CERROCAST, and CERROTRU, slurry applied SERMETEL 481 and flame-sprayed aluminum were investigated as filler materials. Sputter deposition from a cylindrical cathode inverted magnestron was used to apply an OFHC copper closeout layer to filled OFHC copper ribbed-wall cylindrical substrates. The sputtered closeout layer structure was evaluated with respect to filler material contamination, predeposition machining and finishing operations, and deposition parameters. The application of aluminum by flame-spraying resulted in excessiver filler porosity. Though the outgassing from this porosity was found to be detrimental to the closeout layer structure, bond strengths in excess of 10,500 psi were achieved. Removal of the aluminum from the grooves was readily accomplished by leaching in a 7.0 molar solution of sodium hydroxide at 353 K. Of the other filler materials evaluated, CERROTRU was found to be the most suitable material with respect to completely filling the ribbed-wall cylinders and vacuum system compatibility. However, bond contamination resulted in low closeout layer bond strength with the CERROTRU filler. CERROBEND, CERROCAST, and SERMETEL 481 were found to be unacceptable as filler materials.

  16. 17 CFR 300.302 - Mechanics of closeout or completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 3 2013-04-01 2013-04-01 false Mechanics of closeout or completion. 300.302 Section 300.302 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... Completion of Open Contractual Commitments § 300.302 Mechanics of closeout or completion. (a) The closeout or...

  17. 17 CFR 300.302 - Mechanics of closeout or completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 3 2012-04-01 2012-04-01 false Mechanics of closeout or completion. 300.302 Section 300.302 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... Completion of Open Contractual Commitments § 300.302 Mechanics of closeout or completion. (a) The closeout or...

  18. 17 CFR 300.302 - Mechanics of closeout or completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 4 2014-04-01 2014-04-01 false Mechanics of closeout or completion. 300.302 Section 300.302 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... Completion of Open Contractual Commitments § 300.302 Mechanics of closeout or completion. (a) The closeout or...

  19. 17 CFR 300.302 - Mechanics of closeout or completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Mechanics of closeout or completion. 300.302 Section 300.302 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... Completion of Open Contractual Commitments § 300.302 Mechanics of closeout or completion. (a) The closeout or...

  20. 32 CFR 22.825 - Closeout audits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Closeout audits. 22.825 Section 22.825 National... GRANTS AND AGREEMENTS-AWARD AND ADMINISTRATION Post-Award Administration § 22.825 Closeout audits. (a) Purpose. This section establishes DoD policy for obtaining audits at closeout of individual grants and...

  1. Air Force Military Personnel Entitlement Pay in Support of Contingency Operations

    DTIC Science & Technology

    2010-08-23

    Report No. A-2006-0067- FFM , “Military Pay for Operation Enduring Freedom/Operation Iraqi Freedom Active Components,” April 5, 2006 U.S. Army Audit...Agency Report No. A-2006-0079- FFM , “Material Weakness Closeout on Line of Duty and Incapacitation Pay,” March 8, 2006 22B22BAir Force Air Force

  2. 77 FR 70799 - Notice of Neighborhood Stabilization Program; Closeout Requirements and Recapture

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... from the disposition of real property or from loans outstanding at the time of closeout shall not be... with the CDBG closeout procedures because, by the time of grant closeout, almost every NSP grantee will... necessary to allow an NSP grantee to continue to use NSP program income on hand at the time of grant...

  3. Rocket-Based Combined Cycle Engine Concept Development

    NASA Technical Reports Server (NTRS)

    Ratekin, G.; Goldman, Allen; Ortwerth, P.; Weisberg, S.; McArthur, J. Craig (Technical Monitor)

    2001-01-01

    The development of rocket-based combined cycle (RBCC) propulsion systems is part of a 12 year effort under both company funding and contract work. The concept is a fixed geometry integrated rocket, ramjet, scramjet, which is hydrogen fueled and uses hydrogen regenerative cooling. The baseline engine structural configuration uses an integral structure that eliminates panel seals, seal purge gas, and closeout side attachments. Engine A5 is the current configuration for NASA Marshall Space Flight Center (MSFC) for the ART program. Engine A5 models the complete flight engine flowpath of inlet, isolator, airbreathing combustor, and nozzle. High-performance rocket thrusters are integrated into the engine enabling both low speed air-augmented rocket (AAR) and high speed pure rocket operation. Engine A5 was tested in GASL's new Flight Acceleration Simulation Test (FAST) facility in all four operating modes, AAR, RAM, SCRAM, and Rocket. Additionally, transition from AAR to RAM and RAM to SCRAM was also demonstrated. Measured performance demonstrated vision vehicle performance levels for Mach 3 AAR operation and ramjet operation from Mach 3 to 4. SCRAM and rocket mode performance was above predictions. For the first time, testing also demonstrated transition between operating modes.

  4. KSC-2013-1125

    NASA Image and Video Library

    2013-01-12

    VANDENBERG AFB, Calif. – A technician performs thermal blanket closeouts on the fuel servicing valves on the Landsat Data Continuity Mission, or LDCM, spacecraft in the Astrotech processing facility at Vandenberg Air Force Base in Calif., following fueling operations. The Landsat Data Continuity Mission is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 11, 2013. For more information, visit: http://www.nasa.gov/mission_pages/landsat/main/index.html Photo credit: VAFB

  5. KSC-2013-1127

    NASA Image and Video Library

    2013-01-12

    VANDENBERG AFB, Calif. – A technician performs thermal blanket closeouts on the fuel servicing valves of the Landsat Data Continuity Mission, or LDCM, spacecraft in the Astrotech processing facility at Vandenberg Air Force Base in Calif., following fueling operations. The Landsat Data Continuity Mission is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 11, 2013. For more information, visit: http://www.nasa.gov/mission_pages/landsat/main/index.html Photo credit: VAFB

  6. KSC-2013-1126

    NASA Image and Video Library

    2013-01-12

    VANDENBERG AFB, Calif. – A technician performs thermal blanket closeouts on the fuel servicing valves on the Landsat Data Continuity Mission, or LDCM, spacecraft in the Astrotech processing facility at Vandenberg Air Force Base in Calif., following fueling operations. The Landsat Data Continuity Mission is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 11, 2013. For more information, visit: http://www.nasa.gov/mission_pages/landsat/main/index.html Photo credit: VAFB

  7. KSC-2013-1129

    NASA Image and Video Library

    2013-01-12

    VANDENBERG AFB, Calif. – Technicians perform thermal blanket closeouts on the fuel servicing valves on the Landsat Data Continuity Mission, or LDCM, spacecraft in the Astrotech processing facility at Vandenberg Air Force Base in Calif., following fueling operations. The Landsat Data Continuity Mission is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 11, 2013. For more information, visit: http://www.nasa.gov/mission_pages/landsat/main/index.html Photo credit: VAFB

  8. Lawrence Berkeley National Laboratory 2015 Annual Financial Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Kim, P

    FY2015 financial results reflect a year of significant scientific, operational and financial achievement for Lawrence Berkeley National Laboratory. Complementing many scientific accomplishments, Berkeley Lab completed construction of four new research facilities: the General Purpose Laboratory, Chu Hall, Wang Hall and the Flexlab Building Efficiency Testbed. These state-of-the-art facilities allow for program growth and enhanced collaboration, in part by enabling programs to return to the Lab’s Hill Campus from offsite locations. Detailed planning began for the new Integrative Genomics Building (IGB) that will house another major program currently located offsite. Existing site infrastructure was another key focus area. The Lab prioritizedmore » and increased investments in deferred maintenance in alignment with the Berkeley Lab Infrastructure Plan, which was developed under the leadership of the DOE Office of Science. With the expiration of American Recovery and Reinvestment Act (ARRA) funds, we completed the close-out of all of our 134 ARRA projects, recording total costs of $331M over the FY2009-2015 period. Download the report to read more.« less

  9. Streamlined project closeout for construction at KYTC.

    DOT National Transportation Integrated Search

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  10. 47 CFR 400.10 - Closeout.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Closeout. 400.10 Section 400.10 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.10 Closeout...

  11. 47 CFR 400.10 - Closeout.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Closeout. 400.10 Section 400.10 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.10 Closeout...

  12. 47 CFR 400.10 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Closeout. 400.10 Section 400.10 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.10 Closeout...

  13. 47 CFR 400.10 - Closeout.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Closeout. 400.10 Section 400.10 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.10 Closeout...

  14. 47 CFR 400.10 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Closeout. 400.10 Section 400.10 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.10 Closeout...

  15. 20 CFR 633.316 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Closeout procedures. 633.316 Section 633.316 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR MIGRANT AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.316 Closeout procedures. Grant...

  16. 48 CFR 1204.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...

  17. 48 CFR 1204.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...

  18. 48 CFR 4.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Closeout of contract files. 4.804 Section 4.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804 Closeout of contract files. ...

  19. 48 CFR 1404.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Closeout of contract files. 1404.804 Section 1404.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.804 Closeout of contract files. ...

  20. 48 CFR 904.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Closeout of contract files. 904.804 Section 904.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804 Closeout of contract files. ...

  1. 48 CFR 904.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Closeout of contract files. 904.804 Section 904.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804 Closeout of contract files. ...

  2. 48 CFR 904.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Closeout of contract files. 904.804 Section 904.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804 Closeout of contract files. ...

  3. 48 CFR 1504.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Closeout of contract files. 1504.804 Section 1504.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL ADMINISTRATIVE MATTERS Contract Files 1504.804 Closeout of contract files. ...

  4. 48 CFR 1304.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Closeout of contract files. 1304.804 Section 1304.804 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804 Closeout of contract files. ...

  5. 48 CFR 1504.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Closeout of contract files. 1504.804 Section 1504.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL ADMINISTRATIVE MATTERS Contract Files 1504.804 Closeout of contract files. ...

  6. 48 CFR 4.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Closeout of contract files. 4.804 Section 4.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804 Closeout of contract files. ...

  7. 48 CFR 4.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Closeout of contract files. 4.804 Section 4.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804 Closeout of contract files. ...

  8. 48 CFR 4.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Closeout of contract files. 4.804 Section 4.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804 Closeout of contract files. ...

  9. 48 CFR 1304.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Closeout of contract files. 1304.804 Section 1304.804 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804 Closeout of contract files. ...

  10. 48 CFR 1404.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Closeout of contract files. 1404.804 Section 1404.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.804 Closeout of contract files. ...

  11. 48 CFR 1304.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Closeout of contract files. 1304.804 Section 1304.804 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804 Closeout of contract files. ...

  12. 48 CFR 1204.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...

  13. 48 CFR 1404.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Closeout of contract files. 1404.804 Section 1404.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.804 Closeout of contract files. ...

  14. 48 CFR 1204.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...

  15. 48 CFR 1504.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Closeout of contract files. 1504.804 Section 1504.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL ADMINISTRATIVE MATTERS Contract Files 1504.804 Closeout of contract files. ...

  16. 48 CFR 1304.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Closeout of contract files. 1304.804 Section 1304.804 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804 Closeout of contract files. ...

  17. 48 CFR 1504.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Closeout of contract files. 1504.804 Section 1504.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL ADMINISTRATIVE MATTERS Contract Files 1504.804 Closeout of contract files. ...

  18. 48 CFR 4.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Closeout of contract files. 4.804 Section 4.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804 Closeout of contract files. ...

  19. 48 CFR 1504.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Closeout of contract files. 1504.804 Section 1504.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL ADMINISTRATIVE MATTERS Contract Files 1504.804 Closeout of contract files. ...

  20. 48 CFR 1304.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Closeout of contract files. 1304.804 Section 1304.804 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804 Closeout of contract files. ...

  1. 48 CFR 904.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Closeout of contract files. 904.804 Section 904.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804 Closeout of contract files. ...

  2. 48 CFR 1404.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Closeout of contract files. 1404.804 Section 1404.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.804 Closeout of contract files. ...

  3. 48 CFR 1204.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...

  4. 48 CFR 1404.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Closeout of contract files. 1404.804 Section 1404.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL ADMINISTRATIVE MATTERS Contract Files 1404.804 Closeout of contract files. ...

  5. 48 CFR 904.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Closeout of contract files. 904.804 Section 904.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804 Closeout of contract files. ...

  6. 48 CFR 1304.804-70 - Contract closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Contract closeout procedures. 1304.804-70 Section 1304.804-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804-70 Contract closeout procedures. CAM...

  7. 48 CFR 1304.804-70 - Contract closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Contract closeout procedures. 1304.804-70 Section 1304.804-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804-70 Contract closeout procedures. CAM...

  8. 48 CFR 1304.804-70 - Contract closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contract closeout procedures. 1304.804-70 Section 1304.804-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804-70 Contract closeout procedures. CAM...

  9. 48 CFR 1304.804-70 - Contract closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract closeout procedures. 1304.804-70 Section 1304.804-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804-70 Contract closeout procedures. CAM...

  10. 48 CFR 1304.804-70 - Contract closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract closeout procedures. 1304.804-70 Section 1304.804-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1304.804-70 Contract closeout procedures. CAM...

  11. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    DTIC Science & Technology

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  12. KENNEDY SPACE CENTER, FLA. - Volunteers from the KSC Fire-Rescue team dressed in launch and entry suits settle into seats in an orbiter crew compartment mock-up under the guidance of George Brittingham, USA suit technician on the Closeout Crew. Brittingham is helping Catherine Di Biase, a nurse with Bionetics Life Sciences. They are all taking part in a “Mode VII” emergency landing simulation at Kennedy Space Center. The purpose is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. This simulation presents an orbiter that has crashed short of the Shuttle Landing Facility in a wooded area 2-1/2 miles south of Runway 33. Emergency crews will respond to the volunteer “astronauts” simulating various injuries. Rescuers must remove the crew, provide triage and transport to hospitals those who need further treatment. Local hospitals are participating in the exercise.

    NASA Image and Video Library

    2004-02-18

    KENNEDY SPACE CENTER, FLA. - Volunteers from the KSC Fire-Rescue team dressed in launch and entry suits settle into seats in an orbiter crew compartment mock-up under the guidance of George Brittingham, USA suit technician on the Closeout Crew. Brittingham is helping Catherine Di Biase, a nurse with Bionetics Life Sciences. They are all taking part in a “Mode VII” emergency landing simulation at Kennedy Space Center. The purpose is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. This simulation presents an orbiter that has crashed short of the Shuttle Landing Facility in a wooded area 2-1/2 miles south of Runway 33. Emergency crews will respond to the volunteer “astronauts” simulating various injuries. Rescuers must remove the crew, provide triage and transport to hospitals those who need further treatment. Local hospitals are participating in the exercise.

  13. 22 CFR 226.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Closeout procedures. 226.71 Section 226.71 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS After-the-Award Requirements § 226.71 Closeout procedures. (a) Recipients shall...

  14. 7 CFR 1753.82 - Minor construction closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Minor construction closeout. 1753.82 Section 1753.82... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.82 Minor construction closeout. (a) For minor construction inspected by the borrower's engineer, an original and two...

  15. 7 CFR 1753.82 - Minor construction closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Minor construction closeout. 1753.82 Section 1753.82... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Minor Construction § 1753.82 Minor construction closeout. (a) For minor construction inspected by the borrower's engineer, an original and two...

  16. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...

  17. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...

  18. 48 CFR 204.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Closeout of contract files. 204.804 Section 204.804 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.804 Closeout of contract files. (1...

  19. 48 CFR 204.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Closeout of contract files. 204.804 Section 204.804 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.804 Closeout of contract files...

  20. 48 CFR 204.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Closeout of contract files. 204.804 Section 204.804 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.804 Closeout of contract files...

  1. 48 CFR 204.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Closeout of contract files. 204.804 Section 204.804 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.804 Closeout of contract files. (1...

  2. 48 CFR 204.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Closeout of contract files. 204.804 Section 204.804 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.804 Closeout of contract files. (1...

  3. 22 CFR 145.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Closeout procedures. 145.71 Section 145.71 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 145.71 Closeout...

  4. Pilot Susan L. Still chats with white room closeout crew member

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-83 Pilot Susan L. Still chats with white room closeout crew member Rene Arriens as she prepares to enter the Space Shuttle Columbia at Launch Pad 39A with assistance from closeout crew worker Bob Saulnier (behind Still).

  5. 17 CFR 300.302 - Mechanics of closeout or completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Mechanics of closeout or completion. 300.302 Section 300.302 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) Schedule A to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION CORPORATION Closeout Or...

  6. 48 CFR 304.804-70 - Contract closeout audits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contract closeout audits. 304.804-70 Section 304.804-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE MATTERS Government Contract Files 304.804-70 Contract closeout audits. (a) Contracting Officers...

  7. 48 CFR 304.804-70 - Contract closeout audits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contract closeout audits. 304.804-70 Section 304.804-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE MATTERS Government Contract Files 304.804-70 Contract closeout audits. (a) Contracting Officers...

  8. 48 CFR 304.804-70 - Contract closeout audits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract closeout audits. 304.804-70 Section 304.804-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATIVE MATTERS Government Contract Files 304.804-70 Contract closeout audits. (a) Contracting Officers...

  9. Rocketdyne RBCC Engine Concept Development

    NASA Technical Reports Server (NTRS)

    Ratckin, G.; Goldman, A.; Ortwerth, P.; Weisberg, S.

    1999-01-01

    Boeing Rocketdyne is pursuing the development of Rocket Based Combined Cycle (RBCC), propulsion systems as demonstrated by significant contract work in the hypersonic arena (ART, NASP, SCT, system studies) and over 12 years of steady company discretionary investment. The Rocketdyne concept is a fixed geometry integrated rocket, ramjet, scramjet which is hydrogen fueled and uses hydrogen regenerative cooling. The baseline engine structural configuration uses an integral structure that eliminates panel seals. seal purge gas, and closeout side attachments. Rocketdyne's experimental RBCC engine (Engine A5) was constructed under contract with the NASA Marshall Space Flight Center. Engine A5 models the complete flight engine flowpath consisting of an inlet, isolator, airbreathing combustor and nozzle. High performance rocket thrusters are integrated into the engine to enable both air-augmented rocket (AAR) and pure rocket operation. Engine A5 was tested in CASL's new FAST facility as an air-augmented rocket, a ramjet and a pure rocket. Measured performance demonstrated vision vehicle performance levels for Mach 3 AAR operation and ramjet operation from Mach 3 to 4. Rocket mode performance was above predictions. For the first time. testing also demonstrated transition from AAR operation to ramjet operation. This baseline configuration has also been shown, in previous testing, to perform well in the scramjet mode.

  10. 7 CFR 1753.39 - Closeout documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... amendments may be submitted to RUS with the engineer's contract closeout certification. (b) Taxes. Under the... equipment, material and software covered by the contracts. If any such tax is paid by the bidder, the... closeout procedure contained in RUS Contract Form 525, the borrower shall: (1) Obtain from the engineer a...

  11. 7 CFR 1753.39 - Closeout documents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... amendments may be submitted to RUS with the engineer's contract closeout certification. (b) Taxes. Under the... equipment, material and software covered by the contracts. If any such tax is paid by the bidder, the... closeout procedure contained in RUS Contract Form 525, the borrower shall: (1) Obtain from the engineer a...

  12. 7 CFR 1753.39 - Closeout documents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... amendments may be submitted to RUS with the engineer's contract closeout certification. (b) Taxes. Under the... equipment, material and software covered by the contracts. If any such tax is paid by the bidder, the... closeout procedure contained in RUS Contract Form 525, the borrower shall: (1) Obtain from the engineer a...

  13. 7 CFR 1753.39 - Closeout documents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... amendments may be submitted to RUS with the engineer's contract closeout certification. (b) Taxes. Under the... equipment, material and software covered by the contracts. If any such tax is paid by the bidder, the... closeout procedure contained in RUS Contract Form 525, the borrower shall: (1) Obtain from the engineer a...

  14. 48 CFR 4.804-3 - Closeout of paying office contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Closeout of paying office contract files. 4.804-3 Section 4.804-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-3 Closeout of paying office...

  15. 48 CFR 4.804-3 - Closeout of paying office contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Closeout of paying office contract files. 4.804-3 Section 4.804-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-3 Closeout of paying office...

  16. 48 CFR 904.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Closeout by the office administering the contract. 904.804-1 Section 904.804-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804-1 Closeout by the office...

  17. 48 CFR 4.804-3 - Closeout of paying office contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Closeout of paying office contract files. 4.804-3 Section 4.804-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-3 Closeout of paying office...

  18. 48 CFR 4.804-3 - Closeout of paying office contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Closeout of paying office contract files. 4.804-3 Section 4.804-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-3 Closeout of paying office...

  19. 48 CFR 4.804-3 - Closeout of paying office contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Closeout of paying office contract files. 4.804-3 Section 4.804-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-3 Closeout of paying office...

  20. 48 CFR 4.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Closeout by the office administering the contract. 4.804-1 Section 4.804-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-1 Closeout by the office...

  1. 48 CFR 904.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Closeout by the office administering the contract. 904.804-1 Section 904.804-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804-1 Closeout by the office...

  2. 48 CFR 4.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Closeout by the office administering the contract. 4.804-1 Section 4.804-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-1 Closeout by the office...

  3. 48 CFR 4.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Closeout by the office administering the contract. 4.804-1 Section 4.804-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-1 Closeout by the office...

  4. 48 CFR 904.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Closeout by the office administering the contract. 904.804-1 Section 904.804-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804-1 Closeout by the office...

  5. 48 CFR 4.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Closeout by the office administering the contract. 4.804-1 Section 4.804-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-1 Closeout by the office...

  6. 48 CFR 904.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Closeout by the office administering the contract. 904.804-1 Section 904.804-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804-1 Closeout by the office...

  7. 24 CFR 954.504 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reports for all projects using funds to be closed out have been submitted. HUD will use data contained in the project completion reports in the preparation of the Closeout Reports; (3) The grantee has been... grantee by the Area ONAP must include verification of data reflected in the Closeout Report and...

  8. 24 CFR 954.504 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... be received by HUD. If the audit review by the Department of Interior (DOI) results in significant delays, the Area ONAP may request a signed copy of the audit prior to DOI review and use it as the document needed prior to closeout. If the audit does not cover all funds to be closed out, the closeout may...

  9. 24 CFR 84.87 - Closeout procedures, subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the award. HUD may approve extensions when requested by the recipient. (2) The recipient shall account... responsibilities. (1) The closeout of an award does not affect any of the following: (i) Audit requirements in § 84...) Closeout procedures. (1) Recipients shall submit, within 90 calendar days after the date of completion of...

  10. 24 CFR 84.87 - Closeout procedures, subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the award. HUD may approve extensions when requested by the recipient. (2) The recipient shall account... responsibilities. (1) The closeout of an award does not affect any of the following: (i) Audit requirements in § 84...) Closeout procedures. (1) Recipients shall submit, within 90 calendar days after the date of completion of...

  11. 24 CFR 84.87 - Closeout procedures, subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the award. HUD may approve extensions when requested by the recipient. (2) The recipient shall account... responsibilities. (1) The closeout of an award does not affect any of the following: (i) Audit requirements in § 84...) Closeout procedures. (1) Recipients shall submit, within 90 calendar days after the date of completion of...

  12. 24 CFR 84.87 - Closeout procedures, subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the award. HUD may approve extensions when requested by the recipient. (2) The recipient shall account... responsibilities. (1) The closeout of an award does not affect any of the following: (i) Audit requirements in § 84...) Closeout procedures. (1) Recipients shall submit, within 90 calendar days after the date of completion of...

  13. 24 CFR 84.87 - Closeout procedures, subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the award. HUD may approve extensions when requested by the recipient. (2) The recipient shall account... responsibilities. (1) The closeout of an award does not affect any of the following: (i) Audit requirements in § 84...) Closeout procedures. (1) Recipients shall submit, within 90 calendar days after the date of completion of...

  14. 49 CFR 262.19 - Close-out procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Close-out procedures. 262.19 Section 262.19... IMPROVEMENT PROJECTS § 262.19 Close-out procedures. (a) Thirty days before the end of the grant period, FRA will notify the State that the period of performance for the grant is about to expire and that close...

  15. 48 CFR 3004.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Closeout by the office administering the contract. 3004.804-1 Section 3004.804-1 Federal Acquisition Regulations System DEPARTMENT OF... Government Contract Files 3004.804-1 Closeout by the office administering the contract. (b) The quick...

  16. Closeup view of the Solid Rocket Booster Frustum and Nose ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close-up view of the Solid Rocket Booster Frustum and Nose Cap assembly undergoing preparations and close-out procedures in the Solid Rocket Booster Assembly and Refurbishment Facility at Kennedy Space Center. The Nose Cap contains the Pilot and Drogue Chutes and the Frustum contains the three Main Parachutes, Altitude Switches and forward booster Separation Motors. - Space Transportation System, Solid Rocket Boosters, Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX

  17. 48 CFR 904.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Closeout by the office administering the contract. 904.804-1 Section 904.804-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL ADMINISTRATIVE MATTERS Government Contract Files 904.804-1 Closeout by the office administering the contract. (a) The Head of th...

  18. 48 CFR 4.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Closeout by the office administering the contract. 4.804-1 Section 4.804-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-1 Closeout by the office administering the contract. (a) Except as...

  19. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  20. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 4.804-2 Closeout of the contracting...

  1. 7 CFR 277.16 - Suspension, disallowance and program closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 277.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION... State Plan of Operation. (2) FNS may also disallow costs and institute recovery of Federal funds when a... recovered through the offset procedure should be in one lump sum. If recovery of funds through the offset...

  2. Saturn S-2 production operations techniques: Production welding. Volume 1: Bulkhead welding

    NASA Technical Reports Server (NTRS)

    Abel, O. G.

    1970-01-01

    The complex Saturn S-2 welding processes and procedures required considerable development and refinement to establish a production capability that could consistently produce aluminum alloy welds within specified requirements. The special processes and techniques are defined that were established for the welding of gore-to-gore and manhole- or closeout-to-gore.

  3. 7 CFR 1944.426 - Grant closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.426 Grant closeout. (a) Grant... requirements established in this part, including audits of self-help borrower accounts. (5) Upon request from...

  4. 48 CFR 42.708 - Quick-closeout procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.708 Quick-closeout procedure. (a... waive the 15 percent restriction based upon a risk assessment that considers the contractor's accounting...

  5. Closeout of IE Bulletin 83-05: ASME nuclear code pumps and spare parts manufactured by the Hayward Tyler Pump Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foley, W.J.; Dean, R.S.; Hennick, A.

    Documentation is provided in this report to close IE Bulletin 83-05 regarding ASME nuclear code pumps and spare parts manufactured by the Hayward Tyler Pump Company (HTPC). The bulletin was issued (1) to alert holders of operating licenses and construction permits of nuclear power plants that HTPC failed to implement effectively their quality assurance (QA) program from 1977 to 1981 and (2) to require affected utilities to take action to resolve the potential for failure of the subject pumps and their spare parts. Evaluation of utility responses and NRC/Region inspection reports shows that reliability of the affected pumps was ensuredmore » by means of procedures and performance testing of the pumps as required by the bulletin. Based on the evaluation, in accordance with specific criteria, the bulletin is closed for 116 (98%) of the 118 facilities to which it was issued for action and which were not shut down indefinitely or permanently at the time of issuance of this report. A follow-up item is proposed for the two facilities with open bulletin status. Based on favorable results, a conclusion is presented to indicate that the bulletin concerns have been resolved.« less

  6. Results of the radiological survey of the Carpenter Steel Facility, Reading, Pennsylvania

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cottrell, W.D.; Carrier, R.F.

    1990-07-01

    In 1944, experimental uranium-forming work was conducted by Carpenter Technology Corporation at the Carpenter Steel Facility in Reading, Pennsylvania, under contract to the Manhattan Engineer District (MED). The fabrication method, aimed at producing sounder uranium metal and improving the yields of rods from billets, was reportedly soon discarded as unsatisfactory. As part of the Department of Energy's (DOE) efforts to verify the closeout status of facilities under contract to agencies preceding DOE during early nuclear energy development, the site was included in the Formerly Utilized Sites Remedial Action Program (FUSRAP). At the request of DOE, the Measurement Applications and Developmentmore » Group of the Health and Safety Research Division of Oak Ridge National Laboratory performed a radiological assessment survey in July and August 1988. The purpose of the survey was to determine if past operations had deposited radioactive residues in the facility, and whether those residuals were in significant quantities when compared to DOE guidelines. The survey included gamma scanning; direct measurements of alpha activity levels and beta-gamma dose rates; sampling for transferable alpha and beta-gamma residuals on selected surfaces; and sampling of soil, debris and currently used processing materials for radionuclide analysis. All survey results were within DOE FUSRAP guidelines derived to determine the eligibility of a site for remedial action. These guidelines are derived to ensure that unrestricted use of the property will not result in any measurable radiological hazard to the site occupants or the general public. 4 refs., 5 figs., 5 tabs.« less

  7. Grant Closeout Requirements and Reports

    Cancer.gov

    Requirements and reports to comply with grant closeout, including Final Federal Financial Report (FFR, SF425); Final Research Performance Progress Report (FRPPR); Interim Research Performance Progress Report (IRPPR); Final Invention Statement (FIS, HHS

  8. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSTITUTE OF FOOD AND AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.24 Reporting requirements, monitoring, and close-out. VMLRP...

  9. OA-7 Final "Powered" Cargo Loading and Closeouts Banner Installation

    NASA Image and Video Library

    2017-03-06

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians perform final cargo and power installation in the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station

  10. 45 CFR 74.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., AND COMMERCIAL ORGANIZATIONS After-the-Award Requirements § 74.71 Closeout procedures. (a) Recipients... refund any balances of unobligated cash that HHS has advanced or paid and that is not authorized to be...

  11. 15 CFR 14.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMERCIAL ORGANIZATIONS After-the-Award Requirements § 14.71 Closeout procedures. (a) Recipients shall... recipient shall promptly refund any balances of unobligated funds that the DoC has advanced or paid and that...

  12. 7 CFR 1753.58 - Closeout documents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... followed in the preparation of closeout documents for the FAP. (2) The period between the completion of... documents required to close the FAP are listed in the following table. The following is a brief description...

  13. 7 CFR 1753.58 - Closeout documents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... followed in the preparation of closeout documents for the FAP. (2) The period between the completion of... documents required to close the FAP are listed in the following table. The following is a brief description...

  14. 7 CFR 1753.58 - Closeout documents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... followed in the preparation of closeout documents for the FAP. (2) The period between the completion of... documents required to close the FAP are listed in the following table. The following is a brief description...

  15. 7 CFR 1753.58 - Closeout documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... followed in the preparation of closeout documents for the FAP. (2) The period between the completion of... documents required to close the FAP are listed in the following table. The following is a brief description...

  16. 7 CFR 1753.58 - Closeout documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... followed in the preparation of closeout documents for the FAP. (2) The period between the completion of... documents required to close the FAP are listed in the following table. The following is a brief description...

  17. Frequent Questions about Closeouts

    EPA Pesticide Factsheets

    EPA policy defines a closeout as the systematic process by which EPA determines that all required technical work under a grant or cooperative agreement has been completed by the recipient and EPA, and all applicable administrative requirements are met.

  18. 20 CFR 435.71 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND.... (g) In the event a final audit has not been performed prior to the closeout of an award, SSA will... disallowed costs resulting from the final audit. ...

  19. 78 FR 23778 - Notice of Proposed Information Collection: Comment Request: Congressional Earmark Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... (NI) grantees. The agency has used the application, semi-annual reports and close-out reports to track... Neighborhood Initiative (NI) grantees. The agency has used the application, semi-annual reports and close-out...

  20. STS-79 Pilot Terrence Wilcutt in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-79 Pilot Terrence W. Wilcutt chats with white room closeout crew lead Rick Welty before climbing into the flight deck of the Space Shuttle Atlantis at Launch Pad 39A; at right is closeout crew member Jim Davis.

  1. ALSEP termination report

    NASA Technical Reports Server (NTRS)

    Bates, J. R.; Lauderdale, W. W.; Kernaghan, H.

    1979-01-01

    The Apollo Lunar Surface Experiments Package (ALSEP) final report was prepared when support operations were terminated September 30, 1977, and NASA discontinued the receiving and processing of scientific data transmitted from equipment deployed on the lunar surface. The ALSEP experiments (Apollo 11 to Apollo 17) are described and pertinent operational history is given for each experiment. The ALSEP data processing and distribution are described together with an extensive discussion on archiving. Engineering closeout tests and results are given, and the status and configuration of the experiments at termination are documented. Significant science findings are summarized by selected investigators. Significant operational data and recommendations are also included.

  2. 20 CFR 435.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Closeout procedures. 435.71 Section 435.71 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL...

  3. 40 CFR 35.6780 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Closeout. 35.6780 Section 35.6780 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Other...

  4. 40 CFR 35.6780 - Closeout.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Closeout. 35.6780 Section 35.6780 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Other...

  5. 48 CFR 3004.804 - Closeout of contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Closeout of contract files. 3004.804 Section 3004.804 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files...

  6. 48 CFR 3004.804 - Closeout of contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Closeout of contract files. 3004.804 Section 3004.804 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files...

  7. 48 CFR 3004.804 - Closeout of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Closeout of contract files. 3004.804 Section 3004.804 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files...

  8. 48 CFR 3004.804 - Closeout of contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Closeout of contract files. 3004.804 Section 3004.804 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files...

  9. 48 CFR 3004.804 - Closeout of contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Closeout of contract files. 3004.804 Section 3004.804 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files...

  10. Effect of low-stiffness closeout overwrap on rocket thrust-chamber life

    NASA Technical Reports Server (NTRS)

    Kasper, H. J.; Nota-Donato, J. J.

    1979-01-01

    Three rocket thrust chambers with copper liners and a thrust level of 20.9 kN were cyclically test fired to failure. Two of the liners were made from oxygen free, high conductivity (OFHC) copper and from annealed Amzirc. The milled coolant channels were closed out with a thin copper closeout over which a fiberglass composite was wrapped to provide hoop strength only. Experimental data are presented, along with the results of a preliminary analysis that was performed before fabrication to evaluate the life extending potential of a thin copper closeout with a fiberglass overwrap.

  11. KSC-99pp1292

    NASA Image and Video Library

    1999-11-09

    KENNEDY SPACE CENTER, FLA. -- Rodney Wilson, with United Space Alliance, inspects the range safety cable between the external tank and solid rocket boosters (SRB) on Space Shuttle Discovery. The cable, which relays a redundant emergency destruction signal between the SRBs in the unlikely event of a contingency, was damaged during close-out operations and is being replaced. Discovery's processing schedule leads to a target launch date of Dec. 6

  12. STS-69 Mission Commander David M. Walker in white room

    NASA Technical Reports Server (NTRS)

    1995-01-01

    STS-69 Mission Commander David M. Walker chats with white room closeout crew members Bob Saulnier (left), Regulo Villalobos and closeout crew leader Travis Thompson prior to entering the flight deck of the Space Shuttle Endeavour at Launch Pad 39A.

  13. 49 CFR 19.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Award Requirements § 19.71 Closeout procedures. (a) Recipients shall submit, within 90 calendar days... requested by the recipient. (b) Unless the Federal awarding agency authorizes an extension, a recipient... recipient for allowable reimbursable costs under the award being closed out. (d) The recipient shall...

  14. 24 CFR 511.77 - Grant closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... Grant closeout. (a) Each individual fiscal year rental rehabilitation grant will be closed out when all... Rehabilitation Program. (HUD still has the authority to conduct an audit or to contract with an independent...

  15. 24 CFR 511.77 - Grant closeout.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... Grant closeout. (a) Each individual fiscal year rental rehabilitation grant will be closed out when all... Rehabilitation Program. (HUD still has the authority to conduct an audit or to contract with an independent...

  16. 7 CFR 634.19 - Project completion and closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project completion and closeout. 634.19 Section 634.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding...

  17. 7 CFR 634.19 - Project completion and closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Project completion and closeout. 634.19 Section 634.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding...

  18. 7 CFR 634.19 - Project completion and closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project completion and closeout. 634.19 Section 634.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding...

  19. 7 CFR 634.19 - Project completion and closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project completion and closeout. 634.19 Section 634.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding...

  20. 7 CFR 634.19 - Project completion and closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Project completion and closeout. 634.19 Section 634.19 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding...

  1. 7 CFR 249.15 - Closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Closeout procedures. 249.15 Section 249.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions § 249...

  2. 7 CFR 248.15 - Closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Closeout procedures. 248.15 Section 248.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions § 248.15...

  3. 7 CFR 227.42 - Grant closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Grant closeout procedures. 227.42 Section 227.42 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM Miscellaneous § 227.42 Grant...

  4. 7 CFR 248.15 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Closeout procedures. 248.15 Section 248.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions § 248.15...

  5. 7 CFR 227.42 - Grant closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Grant closeout procedures. 227.42 Section 227.42 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM Miscellaneous § 227.42 Grant...

  6. 7 CFR 227.42 - Grant closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Grant closeout procedures. 227.42 Section 227.42 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM Miscellaneous § 227.42 Grant...

  7. 7 CFR 248.15 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Closeout procedures. 248.15 Section 248.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions § 248.15...

  8. 7 CFR 227.42 - Grant closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Grant closeout procedures. 227.42 Section 227.42 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM Miscellaneous § 227.42 Grant...

  9. 7 CFR 248.15 - Closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Closeout procedures. 248.15 Section 248.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions § 248.15...

  10. 7 CFR 248.15 - Closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Closeout procedures. 248.15 Section 248.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions § 248.15...

  11. 7 CFR 249.15 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Closeout procedures. 249.15 Section 249.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions § 249...

  12. 7 CFR 249.15 - Closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Closeout procedures. 249.15 Section 249.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions § 249...

  13. 7 CFR 227.42 - Grant closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Grant closeout procedures. 227.42 Section 227.42 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM Miscellaneous § 227.42 Grant...

  14. 7 CFR 249.15 - Closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Closeout procedures. 249.15 Section 249.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions § 249...

  15. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Reporting requirements, monitoring, and close-out. 3431.24 Section 3431.24 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the...

  16. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Reporting requirements, monitoring, and close-out. 3431.24 Section 3431.24 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the...

  17. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Reporting requirements, monitoring, and close-out. 3431.24 Section 3431.24 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the...

  18. 24 CFR 85.50 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Closeout. 85.50 Section 85.50 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE, LOCAL AND FEDERALLY RECOGNIZED INDIAN...

  19. 24 CFR 85.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Closeout. 85.50 Section 85.50 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE, LOCAL AND FEDERALLY RECOGNIZED INDIAN...

  20. 24 CFR 85.50 - Closeout.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Closeout. 85.50 Section 85.50 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE, LOCAL AND FEDERALLY RECOGNIZED INDIAN...

  1. 24 CFR 85.50 - Closeout.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Closeout. 85.50 Section 85.50 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE, LOCAL AND FEDERALLY RECOGNIZED INDIAN...

  2. 24 CFR 85.50 - Closeout.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Closeout. 85.50 Section 85.50 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE, LOCAL AND FEDERALLY RECOGNIZED INDIAN...

  3. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  4. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  5. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  6. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  7. 7 CFR 1726.402 - Equipment contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...

  8. 10 CFR 600.171 - Closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Nonprofit Organizations After-The-Award Requirements § 600.171 Closeout procedures. (a) Recipients shall..., and other reports as required by the terms and conditions of the award. DOE may approve extensions when requested by the recipient. (b) Unless DOE authorizes an extension, a recipient shall liquidate...

  9. 10 CFR 600.171 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Nonprofit Organizations After-The-Award Requirements § 600.171 Closeout procedures. (a) Recipients shall..., and other reports as required by the terms and conditions of the award. DOE may approve extensions when requested by the recipient. (b) Unless DOE authorizes an extension, a recipient shall liquidate...

  10. 10 CFR 600.171 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Nonprofit Organizations After-The-Award Requirements § 600.171 Closeout procedures. (a) Recipients shall..., and other reports as required by the terms and conditions of the award. DOE may approve extensions when requested by the recipient. (b) Unless DOE authorizes an extension, a recipient shall liquidate...

  11. 10 CFR 600.171 - Closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Nonprofit Organizations After-The-Award Requirements § 600.171 Closeout procedures. (a) Recipients shall..., and other reports as required by the terms and conditions of the award. DOE may approve extensions when requested by the recipient. (b) Unless DOE authorizes an extension, a recipient shall liquidate...

  12. 10 CFR 600.171 - Closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Nonprofit Organizations After-The-Award Requirements § 600.171 Closeout procedures. (a) Recipients shall..., and other reports as required by the terms and conditions of the award. DOE may approve extensions when requested by the recipient. (b) Unless DOE authorizes an extension, a recipient shall liquidate...

  13. 7 CFR 249.15 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Closeout procedures. 249.15 Section 249.15 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions § 249...

  14. 44 CFR 13.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Closeout. 13.50 Section 13.50 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY... grantee must submit all financial, performance, and other reports required as a condition of the grant...

  15. 24 CFR 570.509 - Grant closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Grant closeout procedures. 570.509 Section 570.509 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...

  16. 7 CFR 215.16 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Suspension, termination and grant closeout procedures. 215.16 Section 215.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN...

  17. 7 CFR 215.16 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Suspension, termination and grant closeout procedures. 215.16 Section 215.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN...

  18. 7 CFR 215.16 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Suspension, termination and grant closeout procedures. 215.16 Section 215.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN...

  19. 7 CFR 215.16 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Suspension, termination and grant closeout procedures. 215.16 Section 215.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN...

  20. 7 CFR 215.16 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Suspension, termination and grant closeout procedures. 215.16 Section 215.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN...

  1. 48 CFR 304.804-70 - Contract closeout audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract closeout audits. 304.804-70 Section 304.804-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL...-reimbursement contracts with colleges and universities, hospitals, non-profit organizations, and State and local...

  2. 48 CFR 304.804-70 - Contract closeout audits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract closeout audits. 304.804-70 Section 304.804-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL...-reimbursement contracts with colleges and universities, hospitals, non-profit organizations, and State and local...

  3. 7 CFR 220.19 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Suspension, termination and grant closeout procedures. 220.19 Section 220.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.19...

  4. 7 CFR 220.19 - Suspension, termination and grant closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Suspension, termination and grant closeout procedures. 220.19 Section 220.19 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.19...

  5. 15 CFR 24.50 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Closeout. 24.50 Section 24.50 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS... reimbursable costs. (2) The grantee must immediately refund to the Federal agency any balance of unobligated...

  6. 24 CFR 590.23 - Program close-out.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Program close-out. 590.23 Section 590.23 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...

  7. 24 CFR 590.23 - Program close-out.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program close-out. 590.23 Section 590.23 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN...

  8. 41 CFR 105-71.150 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Closeout. 105-71.150 Section 105-71.150 Public Contracts and Property Management Federal Property Management Regulations System... grantee must submit all financial, performance, and other reports required as a condition of the grant...

  9. 2 CFR 215.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Closeout procedures. 215.71 Section 215.71 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved UNIFORM... being closed out. (d) The recipient shall promptly refund any balances of unobligated cash that the...

  10. KSC-99pp1290

    NASA Image and Video Library

    1999-11-09

    KENNEDY SPACE CENTER, FLA. -- Terry Kent (left), United Space Alliance, and James Silviano (right), NASA, inspect the range safety cable between the external tank and solid rocket boosters (SRB) on Space Shuttle Discovery. The cable, which relays a redundant emergency destruction signal between the SRBs in the unlikely event of a contingency, was damaged during close-out operations and is being replaced. Discovery's processing schedule leads to a target launch date of Dec. 6

  11. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  12. 76 FR 61732 - Notice of Submission of Proposed Information Collection to OMB Closeout Instructions for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-100] Notice of Submission of Proposed Information Collection to OMB Closeout Instructions for Community Development Block Grant Programs... Block Grant Programs (CDBG). OMB Approval Number: 2506-Pending. Form Numbers: None. Description of the...

  13. 7 CFR 1726.405 - Inventory of work orders (RUS Form 219).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Inventory of work orders (RUS Form 219). 1726.405... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.405 Inventory of work orders (RUS Form 219). Upon completion of the contract closeout, the...

  14. Payload Specialist Gregory T. Linteris

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-83 Payload Specialist Gregory T. Linteris chats with white room closeout crew members as he prepares to enter the Space Shuttle Columbia at Launch Pad 39A. Closeout crew workers Max Kandler (second from right) and Bob Saulnier wait to assist Linteris with his ascent/reentry suit.

  15. Close-Out Report: North Area, Revision 0, LCP Chemicals-Georgia, Brunswick, Georgia

    EPA Pesticide Factsheets

    December 1997 removal close-out report to document response activities in areas north of B-Street at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10879193, DocDate: 12-01-1997 Region ID: 04 DocID: 10879193, DocDate: 12-01-1997

  16. 15 CFR 14.71 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Closeout procedures. 14.71 Section 14.71 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM ADMINISTRATIVE REQUIREMENTS... recipient shall promptly refund any balances of unobligated funds that the DoC has advanced or paid and that...

  17. 17 CFR 300.306 - Completion or closeout pursuant to SIPC direction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Completion or closeout pursuant to SIPC direction. 300.306 Section 300.306 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) Schedule A to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION...

  18. 32 CFR 33.50 - Closeout.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Closeout. 33.50 Section 33.50 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS UNIFORM... performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for...

  19. 32 CFR 33.50 - Closeout.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Closeout. 33.50 Section 33.50 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS UNIFORM... performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for...

  20. 32 CFR 33.50 - Closeout.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Closeout. 33.50 Section 33.50 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS UNIFORM... performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for...

  1. 32 CFR 33.50 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Closeout. 33.50 Section 33.50 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS UNIFORM... performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for...

  2. 32 CFR 33.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Closeout. 33.50 Section 33.50 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS UNIFORM... performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for...

  3. 25 CFR 276.15 - Grant closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... refund to the Bureau any unencumbered balance of cash advanced to the grantee. (3) The Bureau shall... § 276.11. (6) If a final audit has not been performed before the closeout of the grant, the Bureau shall... disallowed costs resulting from the final audit. (b) Suspension. When a grantee has materially failed to...

  4. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government...

  5. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government...

  6. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government...

  7. 48 CFR 4.804-2 - Closeout of the contracting office files if another office administers the contract.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Closeout of the contracting office files if another office administers the contract. 4.804-2 Section 4.804-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Government...

  8. 48 CFR 3004.804-1 - Closeout by the office administering the contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Closeout by the office administering the contract. 3004.804-1 Section 3004.804-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government Contract Files 3004.804-1...

  9. KSC-99pp1291

    NASA Image and Video Library

    1999-11-09

    KENNEDY SPACE CENTER, FLA. -- James Silviano (bottom), NASA, examines the range safety cable between the external tank and solid rocket boosters (SRB) on Space Shuttle Discovery, while Terry Kent (above), United Space Alliance, looks on. The cable, which relays a redundant emergency destruction signal between the SRBs in the unlikely event of a contingency, was damaged during close-out operations and is being replaced. Discovery's processing schedule leads to a target launch date of Dec. 6

  10. Workers inspect the range safety cable between the ET and SRBs

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Terry Kent (left), United Space Alliance, and James Silviano (right), NASA, inspect the range safety cable between the external tank and solid rocket boosters (SRB) on Space Shuttle Discovery. The cable, which relays a redundant emergency destruction signal between the SRBs in the unlikely event of a contingency, was damaged during close-out operations and is being replaced. Discovery's processing schedule leads to a target launch date of Dec. 6.

  11. KSC-04PD-0219

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Volunteers from the KSC Fire-Rescue team dressed in launch and entry suits settle into seats in an orbiter crew compartment mock-up under the guidance of George Brittingham, USA suit technician on the Closeout Crew. Brittingham is helping Catherine Di Biase, a nurse with Bionetics Life Sciences. They are all taking part in a Mode VII emergency landing simulation at Kennedy Space Center. The purpose is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. This simulation presents an orbiter that has crashed short of the Shuttle Landing Facility in a wooded area 2-1/2 miles south of Runway 33. Emergency crews will respond to the volunteer astronauts simulating various injuries. Rescuers must remove the crew, provide triage and transport to hospitals those who need further treatment. Local hospitals are participating in the exercise.

  12. Connective Heating Improvement for Emergency Fire Shelters (CHIEFS): Composition and Performance of Fire Shelter Concepts at Close-Out

    NASA Technical Reports Server (NTRS)

    Fody, Joshua M.; Daryabeigi, Kamran; Bruce, Walter E., III; Wells, John M.; Wusk, Mary E.; Calomino, Anthony M.; Miller, Steve D.

    2018-01-01

    Summary of highlights of the Convective Heating Improvement for Emergency Fire Shelters (CHIEFS) taskunder NASA. CHIEFS was tasked with providing the US Forest Service with an emergency fire shelter forimproved resistance to flame contact. Emphasis is on the final shelter designs at task close-out (end of FY17).

  13. 78 FR 65298 - Proposed Information Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... the GPR, mid-year GPR and a final GPR within 90 days of grant closeout, which provide information for... to complete a GPR, which is due in October, to complete an abbreviated mid-year GPR due in April, and to complete a final GPR within 90 days of grant closeout. The GPR provides information for CNCS staff...

  14. 7 CFR 1599.15 - Suspension, termination, and closeouts of agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... suspended or terminated by FAS if it determines that: (1) The continuation of the assistance provided under... such commodities only as agreed to by FAS; and (2) Follow the closeout procedures in §§ 3019.71 through 3019.73 of this title. (c) An agreement will be considered completed when FAS and the participant have...

  15. 7 CFR 1599.15 - Suspension, termination, and closeouts of agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... suspended or terminated by FAS if it determines that: (1) The continuation of the assistance provided under... such commodities only as agreed to by FAS; and (2) Follow the closeout procedures in §§ 3019.71 through 3019.73 of this title. (c) An agreement will be considered completed when FAS and the participant have...

  16. 7 CFR 1599.15 - Suspension, termination, and closeouts of agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... suspended or terminated by FAS if it determines that: (1) The continuation of the assistance provided under... such commodities only as agreed to by FAS; and (2) Follow the closeout procedures in §§ 3019.71 through 3019.73 of this title. (c) An agreement will be considered completed when FAS and the participant have...

  17. 7 CFR 1599.15 - Suspension, termination, and closeouts of agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... suspended or terminated by FAS if it determines that: (1) The continuation of the assistance provided under... such commodities only as agreed to by FAS; and (2) Follow the closeout procedures in §§ 3019.71 through 3019.73 of this title. (c) An agreement will be considered completed when FAS and the participant have...

  18. 7 CFR 1599.15 - Suspension, termination, and closeouts of agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... suspended or terminated by FAS if it determines that: (1) The continuation of the assistance provided under... such commodities only as agreed to by FAS; and (2) Follow the closeout procedures in §§ 3019.71 through 3019.73 of this title. (c) An agreement will be considered completed when FAS and the participant have...

  19. KSC-2011-5804

    NASA Image and Video Library

    2011-07-21

    CAPE CANAVERAL, Fla. -- In the Flight Vehicle Support Building at NASA Kennedy Space Center's Shuttle Landing Facility (SLF), Kennedy Center Director Bob Cabana speaks with Closeout Crew lead Travis Thompson (left), and STS-135 Assistant Launch Director Pete Nickolenko during a prelanding convoy meeting. A Convoy Command Center vehicle will be positioned near shuttle Atlantis on the SLF. The command vehicle is equipped to control critical communications between the crew still aboard Atlantis and the Launch Control Center. The team will monitor the health of the orbiter systems and direct convoy operations made up of about 40 vehicles, including 25 specially designed vehicles to assist the crew in leaving the shuttle, and prepare the vehicle for towing from the SLF to its processing hangar. Securing the space shuttle fleet's place in history, Atlantis will mark the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Atlantis and its crew delivered to the International Space Station the Raffaello multi-purpose logistics module packed with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 is the 33rd and final flight for Atlantis and final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett

  20. Design and Analysis of Outer Mold Line Close-outs for the Max Launch Abort System (MLAS) Flight Experiment

    NASA Technical Reports Server (NTRS)

    Woods-Vedeler, Jessica A.; Knutson, Jeffrey R.; Schuster, David M.; Tyler, Erik D.

    2010-01-01

    In 2007, the NASA Exploration Systems Mission Directorate (ESMD) chartered the NASA Engineering Safety Center (NESC) to demonstrate an alternate launch abort concept as risk mitigation for the Orion project's baseline "tower" design. On July 8, 2009, a full scale, passive aerodynamically stabilized Max Launch Abort System (MLAS) pad abort demonstrator was successfully launched from NASA Goddard Space Flight Center's Wallops Flight Facility. Aerodynamic close-outs were required to cover openings on the MLAS fairing to prevent aerodynamic flow-through and to maintain the MLAS OML surface shape. Two-ply duct tape covers were designed to meet these needs. The duct tape used was a high strength fiber reinforced duct tape with a rubberized adhesive that demonstrated 4.6 lb/in adhesion strength to the unpainted fiberglass fairing. Adhesion strength was observed to increase as a function of time. The covers were analyzed and experimentally tested to demonstrate their ability to maintain integrity under anticipated vehicle ascent pressure loads and to not impede firing of the drogue chute mortars. Testing included vacuum testing and a mortar fire test. Tape covers were layed-up on thin Teflon sheets to facilitate installation on the vehicle. Custom cut foam insulation board was used to fill mortar hole and separation joint cavities and provide support to the applied tape covers. Flight test results showed that the tape covers remained adhered during flight.

  1. National Computational Infrastructure for Lattice Gauge Theory SciDAC-2 Closeout Report Indiana University Component

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gottlieb, Steven Arthur; DeTar, Carleton; Tousaint, Doug

    This is the closeout report for the Indiana University portion of the National Computational Infrastructure for Lattice Gauge Theory project supported by the United States Department of Energy under the SciDAC program. It includes information about activities at Indian University, the University of Arizona, and the University of Utah, as those three universities coordinated their activities.

  2. KENNEDY SPACE CENTER, FLA. - STS-81 Mission Specialist Jeff Wisoff prepares to enter the Space Shuttle Atlantis at Launch Pad 39B with help from White Room closeout crew members Danny Wyatt (center) and Al Rochford.

    NASA Image and Video Library

    1997-01-12

    KENNEDY SPACE CENTER, FLA. - STS-81 Mission Specialist Jeff Wisoff prepares to enter the Space Shuttle Atlantis at Launch Pad 39B with help from White Room closeout crew members Danny Wyatt (center) and Al Rochford.

  3. View of the O-ring in the top of the aft segment of the right SRB

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This is a close-out photograph of the O-ring in the top of the aft segment of the right solid rocket booster (SRB) flown on Space Shuttle mission 51-L. The photograph was released following a hearing on the accident (10163); Close-out photograph of the top of the aft segment of the right SRB flown on Space Shuttle mission 51-L (10164).

  4. STS-86 Mission Specialist David Wolf in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-86 Mission Specialist David A. Wolf, at center facing camera, prepares to enter the Space Shuttle Atlantis at Launch Pad 39A, with the assistance of Rick Welty, in foreground at center, United Space Alliance (USA) orbiter vehicle closeout chief; and closeout team members, in background from left, Jim Davis, NASA quality assurance specialist; and George Schramm, USA mechanical technician. STS-86 Mission Specialist Vladimir Georgievich Titov, in foreground at far left, is awaiting his turn.

  5. Rapid Fabrication Techniques for Liquid Rocket Channel Wall Nozzles

    NASA Technical Reports Server (NTRS)

    Gradl, Paul R.

    2016-01-01

    The functions of a regeneratively-cooled nozzle are to (1) expand combustion gases to increase exhaust gas velocity while, (2) maintaining adequate wall temperatures to prevent structural failure, and (3) transfer heat from the hot gases to the coolant fluid to promote injector performance and stability. Regeneratively-cooled nozzles are grouped into two categories: tube-wall nozzles and channel wall nozzles. A channel wall nozzle is designed with an internal liner containing a series of integral coolant channels that are closed out with an external jacket. Manifolds are attached at each end of the nozzle to distribute coolant to and away from the channels. A variety of manufacturing techniques have been explored for channel wall nozzles, including state of the art laser-welded closeouts and pressure-assisted braze closeouts. This paper discusses techniques that NASA MSFC is evaluating for rapid fabrication of channel wall nozzles that address liner fabrication, slotting techniques and liner closeout techniques. Techniques being evaluated for liner fabrication include large-scale additive manufacturing of freeform-deposition structures to create the liner blanks. Abrasive water jet milling is being evaluated for cutting the complex coolant channel geometries. Techniques being considered for rapid closeout of the slotted liners include freeform deposition, explosive bonding and Cold Spray. Each of these techniques, development work and results are discussed in further detail in this paper.

  6. Experimental Design for the Evaluation of Detection Techniques of Hidden Corrosion Beneath the Thermal Protective System of the Space Shuttle Orbiter

    NASA Technical Reports Server (NTRS)

    Kammerer, Catherine C.; Jacoby, Joseph A.; Lomness, Janice K.; Hintze, Paul E.; Russell, Richard W.

    2007-01-01

    The United States Space Operational Space Shuttle Fleet Consists of three shuttles with an average age of 19.7 years. Shuttles are exposed to corrosive conditions while undergoing final closeout for missions at the launch pad and extreme conditions during ascent, orbit, and descent that may accelerate the corrosion process. Structural corrosion under TPS could progress undetected (without tile removal) and eventually result in reduction in structural capability sufficient to create negative margins of . safety and ultimate loss of local structural capability.

  7. Final Close-Out Report for DE-FG02-93ER40764

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gyulassy, Miklos

    This is a final close-out report for DOE contract DE-FG02-93ER40764 at Columbia University in New York that funded nuclear theory research at Columbia from 12/15/1992 to 12/14/2015. Highlight of research results from the last FY 2015 period, a list of all 12 PhD students trained through the whole grant, and a list of 201 original papers published from 1993-2015 with impact factor metrics are presented.

  8. KSC-05PD-1086

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians in Space Shuttle Discovery's payload bay perform a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  9. Manufacturing Process Developments for Regeneratively-Cooled Channel Wall Rocket Nozzles

    NASA Technical Reports Server (NTRS)

    Gradl, Paul; Brandsmeier, Will

    2016-01-01

    Regeneratively cooled channel wall nozzles incorporate a series of integral coolant channels to contain the coolant to maintain adequate wall temperatures and expand hot gas providing engine thrust and specific impulse. NASA has been evaluating manufacturing techniques targeting large scale channel wall nozzles to support affordability of current and future liquid rocket engine nozzles and thrust chamber assemblies. The development of these large scale manufacturing techniques focus on the liner formation, channel slotting with advanced abrasive water-jet milling techniques and closeout of the coolant channels to replace or augment other cost reduction techniques being evaluated for nozzles. NASA is developing a series of channel closeout techniques including large scale additive manufacturing laser deposition and explosively bonded closeouts. A series of subscale nozzles were completed evaluating these processes. Fabrication of mechanical test and metallography samples, in addition to subscale hardware has focused on Inconel 625, 300 series stainless, aluminum alloys as well as other candidate materials. Evaluations of these techniques are demonstrating potential for significant cost reductions for large scale nozzles and chambers. Hot fire testing is planned using these techniques in the future.

  10. Development and evaluation of an ablative closeout material for solid rocket booster thermal protection system

    NASA Technical Reports Server (NTRS)

    Patterson, W. J.

    1979-01-01

    A trowellable closeout/repair material designated as MTA-2 was developed and evaluated for use on the Solid Rocket Booster. This material is composed of an epoxy-polysulfide binder and is highly filled with phenolic microballoons for density control and ablative performance. Mechanical property testing and thermal testing were performed in a wind tunnel to simulate the combined Solid Rocket Booster trajectory aeroshear and heating environments. The material is characterized by excellent thermal performance and was used extensively on the Space Shuttle STS-1 and STS-2 flight hardware.

  11. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  12. KSC-2012-1599

    NASA Image and Video Library

    2012-02-29

    VANDENBERG AIR FORCE BASE, Calif. -- In an environmental enclosure in processing facility 1555 at Vandenberg Air Force Base in California, Orbital Sciences technicians are performing fairing closeouts for NASA's Nuclear Spectroscopic Telescope Array NuSTAR spacecraft. The fairing will protect the spacecraft from the heat and aerodynamic pressure generated during ascent to orbit aboard an Orbital Sciences Pegasus XL rocket. After processing of the rocket and spacecraft are complete, they will be flown on Orbital's L-1011 carrier aircraft from Vandenberg to the Ronald Reagan Ballistic Missile Defense Test Site on the Pacific Ocean’s Kwajalein Atoll for launch. The high-energy X-ray telescope will conduct a census of black holes, map radioactive material in young supernovae remnants, and study the origins of cosmic rays and the extreme physics around collapsed stars. For more information, visit http://www.nasa.gov/nustar. Photo credit: NASA/Randy Beaudoin, VAFB

  13. KSC-05PD-1082

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, a technician in Space Shuttle Discovery's payload bay studies a photo of the retract link assembly on the orbiter's main landing gear door prior to conducting a borescope inspection. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  14. KSC-05PD-1077

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  15. KSC-05PD-1080

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  16. KSC-05PD-1079

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  17. KSC-05PD-1085

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians in Space Shuttle Discovery's payload bay monitor the images received during a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  18. KSC-05PD-1084

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, a technician in Space Shuttle Discovery's payload bay performs a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.

  19. Planned Closeout of the Cf-252 Loan/Lease Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sherman, Steven R; Patton, Bradley D

    2012-09-01

    New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

  20. External Tank (ET) Foam Thermal/Structural Analysis Project

    NASA Technical Reports Server (NTRS)

    Moore, David F.; Ungar, Eugene K.; Chang, Li C.; Malroy, Eric T.; Stephan, Ryan A.

    2008-01-01

    An independent study was performed to assess the pre-launch thermally induced stresses in the Space Shuttle External Tank Bipod closeout and Ice/Frost ramps (IFRs). Finite element models with various levels of detail were built that included the three types of foam (BX-265, NCFI 24-124, and PDL 1034) and the underlying structure and bracketry. Temperature profiles generated by the thermal analyses were input to the structural models to calculate the stress levels. An area of high stress in the Bipod closeout was found along the aluminum tank wall near the phenolic insulator and along the phenolic insulator itself. This area of high stress might be prone to cracking and possible delamination. There is a small region of slightly increased stress in the NCFI 24-124 foam near its joint with the Bipod closeout BX-265 foam. The calculated stresses in the NCFI 24-124 acreage foam are highest at the NCFI 24-124/PDL 1034/tank wall interface under the LO2 and LH2 IFRs. The highest calculated stresses in the LH2 NCFI 24-124 foam are higher than in similar locations in the LO2 IFR. This finding is consistent with the dissection results of IFRs on ET-120.

  1. Multipurpose hardened spacecraft insulation

    NASA Technical Reports Server (NTRS)

    Steimer, Carlos H.

    1990-01-01

    A Multipurpose Hardened Spacecraft Multilayer Insulation (MLI) system was developed and implemented to meet diverse survivability and performance requirements. Within the definition and confines of a MLI assembly (blanket), the design: (1) provides environmental protection from natural and induced nuclear, thermal, and electromagnetic radiation; (2) provides adequate electrostatic discharge protection for a geosynchronous satellite; (3) provides adequate shielding to meet radiated emission needs; and (4) will survive ascent differential pressure loads between enclosed volume and space. The MLI design is described which meets these requirements and design evolution and verification is discussed. The application is for MLI blankets which closeout the area between the laser crosslink subsystem (LCS) equipment and the DSP spacecraft cabin. Ancillary needs were implemented to ease installation at launch facility and to survive ascent acoustic and vibration loads. Directional venting accommodations were also incorporated to avoid contamination of LCS telescope, spacecraft sensors, and second surface mirrors (SSMs).

  2. KSC-2012-1600

    NASA Image and Video Library

    2012-02-29

    VANDENBERG AIR FORCE BASE, Calif. -- An Orbital Sciences technician is performing closeout work inside the fairing that will be installed around NASA's Nuclear Spectroscopic Telescope Array NuSTAR spacecraft in processing facility 1555 at Vandenberg Air Force Base in California. The fairing will protect the spacecraft from the heat and aerodynamic pressure generated during ascent to orbit aboard an Orbital Sciences Pegasus XL rocket. After processing of the rocket and spacecraft are complete, they will be flown on Orbital's L-1011 carrier aircraft from Vandenberg to the Ronald Reagan Ballistic Missile Defense Test Site on the Pacific Ocean’s Kwajalein Atoll for launch. The high-energy X-ray telescope will conduct a census of black holes, map radioactive material in young supernovae remnants, and study the origins of cosmic rays and the extreme physics around collapsed stars. For more information, visit http://www.nasa.gov/nustar. Photo credit: NASA/Randy Beaudoin, VAFB

  3. Results of tests of K5NA and a revised formulation of EPDM/cork patch material in MSFC Hot Gas Facility

    NASA Technical Reports Server (NTRS)

    Dean, W. G.

    1982-01-01

    During prelaunch procedures at Kennedy Space Center some of the EPDM Thermal Protection System material was damaged on the Solid Rocket Booster stiffener stubs. The preferred solution was to patch the damaged areas with a cork-filled epoxy patching compound. Before this was done, however, it was requested that this patching technique be checked out by testing it in the MSFC Hot Gas Facility. Two tests were run in the HFG in 1980. The results showed the patch material to be adequate. Since that time, the formulation of the cork-filled epoxy material has been changed. It became necessary to retest this concept to be sure that the new material is as good as or better than the original material. In addition to the revised formulation material, tests were also made using K5NA as the patch material. The objectives of the tests reported herein were to: (1) compare the thermal performance of the original and the new cork-filled epoxy formulations, and (2) compare the K5NA closeout material to these epoxy materials. Material specifications are also discussed.

  4. An intelligent interactive visual database management system for Space Shuttle closeout image management

    NASA Technical Reports Server (NTRS)

    Ragusa, James M.; Orwig, Gary; Gilliam, Michael; Blacklock, David; Shaykhian, Ali

    1994-01-01

    Status is given of an applications investigation on the potential for using an expert system shell for classification and retrieval of high resolution, digital, color space shuttle closeout photography. This NASA funded activity has focused on the use of integrated information technologies to intelligently classify and retrieve still imagery from a large, electronically stored collection. A space shuttle processing problem is identified, a working prototype system is described, and commercial applications are identified. A conclusion reached is that the developed system has distinct advantages over the present manual system and cost efficiencies will result as the system is implemented. Further, commercial potential exists for this integrated technology.

  5. Field joint protection system rain qualification test report

    NASA Technical Reports Server (NTRS)

    Cook, M.

    1989-01-01

    This report documents the procedures, performance, and results obtained from the Field Joint Protection System (FJPS) rain test. This test was performed to validate that the flight configuration FJPS prevents the accumulation of moisture in the redesigned solid rocket motor (RSRM) field joints when subjected to simulated prelaunch natural rain environments. The FJPS test article was exposed to rain simulation for approximately 50 minutes. During the test, water entered through the open upper end of the systems tunnel and was funneled down between the tunnel and case. A sealant void at the moisture seal butt splice allowed this water to flow underneath the FJPS. The most likely cause of voids was improper bondline preparation, particularly on the moisture seal surface. In total, water penetrated underneath approximately 60 percent of the FJPS circumference. Because the test article was substantially different from flight configuration (no systems tunnel closeout), results of this test will not affect current flight motors. Due to the omission of systems tunnel covers and systems tunnel floor plate closeout, the test assembly was not representative of flight hardware and resulted in a gross overtest. It is therefore recommended that the test be declared void. It is also recommended that the test be repeated with a complete closeout of the systems tunnel, sealed systems tunnel ends, and improved adhesive bondline preparation.

  6. Friction plug welding

    NASA Technical Reports Server (NTRS)

    Takeshita, Riki (Inventor); Hibbard, Terry L. (Inventor)

    2001-01-01

    Friction plug welding (FPW) usage is advantageous for friction stir welding (FSW) hole close-outs and weld repairs in 2195 Al--Cu--Li fusion or friction stir welds. Current fusion welding methods of Al--Cu--Li have produced welds containing varied defects. These areas are found by non-destructive examination both after welding and after proof testing. Current techniques for repairing typically small (<0.25) defects weaken the weldment, rely heavily on welders' skill, and are costly. Friction plug welding repairs increase strength, ductility and resistance to cracking over initial weld quality, without requiring much time or operator skill. Friction plug welding while pulling the plug is advantageous because all hardware for performing the weld can be placed on one side of the workpiece.

  7. Closeout Report ARRA supplement to DE-FG02-08ER41546, 03/15/2010 to 03/14/2011 - Advanced Transfer Map Methods for the Description of Particle Beam Dynamics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berz, Martin; Makino, Kyoko

    The ARRA funds were utilized to acquire a cluster of high performance computers, consisting of one Altus 2804 Server based on a Quad AMD Opteron 6174 12C with 4 2.2 GHz nodes of 12 cores each, resulting in 48 directly usable cores; as well as a Relion 1751 Server using an Intel Xeon X5677 consisting of 4 3.46 GHz cores supporting 8 threads. Both systems run the Unix flavor CentOS, which is designed for use without need of updates, which greatly enhances their reliability. The systems are used to operate our COSY INFINITY environment which supports MPI parallelization. The unitsmore » arrived at MSU in September 2010, and were taken into operation shortly thereafter.« less

  8. 7 CFR 3430.61 - Debt collection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-GENERAL AWARD ADMINISTRATIVE PROVISIONS Post-Award and Closeout § 3430.61 Debt collection. The collection... funds, unobligated balances, or other circumstances, are subject to the Department's debt collection...

  9. 29 CFR 95.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-PROFIT ORGANIZATIONS, AND WITH COMMERCIAL ORGANIZATIONS, FOREIGN GOVERNMENTS, ORGANIZATIONS UNDER THE... recipient shall promptly refund any balances of unobligated cash that DOL has advanced or paid and that is...

  10. 7 CFR 277.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Distribution Program on Indian Reservations. Program closeout means the process by which FNS determines that all applicable administrative and financial processes have been completed by the State agency and FNS...

  11. 7 CFR 277.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Distribution Program on Indian Reservations. Program closeout means the process by which FNS determines that all applicable administrative and financial processes have been completed by the State agency and FNS...

  12. 7 CFR 277.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Distribution Program on Indian Reservations. Program closeout means the process by which FNS determines that all applicable administrative and financial processes have been completed by the State agency and FNS...

  13. 20 CFR 437.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Final request for payment (SF-270) (if applicable). (iv) Invention disclosure (if applicable). (v... are not limited to: (i) Final performance or progress report. (ii) Financial Status Report (SF 269) or...

  14. Examples of Cancer Health Disparities

    MedlinePlus

    ... Review & Outcomes Award Issuance Manage Your Award Grants Management Contacts Monitoring Prior Approvals Annual Reporting & Auditing Grant Transfer Grant Closeout Contracts & Small Business Training Cancer Training at NCI (Intramural) Resources for ...

  15. 7 CFR 3431.24 - Reporting requirements, monitoring, and close-out.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE VETERINARY MEDICINE LOAN REPAYMENT PROGRAM Administration of the Veterinary Medicine Loan Repayment Program § 3431.24...

  16. 44 CFR 80.21 - Closeout requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... restriction language to meet the requirements of this part; (b) A photo of each property site after project...

  17. 45 CFR 1157.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  18. 43 CFR 12.90 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  19. 49 CFR 18.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  20. 45 CFR 1183.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  1. 45 CFR 1174.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  2. 28 CFR 66.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  3. 21 CFR 1403.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  4. 22 CFR 135.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5... include but are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF...

  5. 44 CFR 80.21 - Closeout requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... restriction language to meet the requirements of this part; (b) A photo of each property site after project...

  6. 44 CFR 80.21 - Closeout requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... restriction language to meet the requirements of this part; (b) A photo of each property site after project...

  7. 44 CFR 80.21 - Closeout requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... restriction language to meet the requirements of this part; (b) A photo of each property site after project...

  8. 44 CFR 80.21 - Closeout requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... restriction language to meet the requirements of this part; (b) A photo of each property site after project...

  9. 77 FR 36586 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... (Oct. 17, 2008) (``Rule 204T Adopting Release''). \\2\\ Because failure to comply with the close-out..., trading in municipal securities, and using NSCC's Envelope Settlement Service or Inter-city Envelope...

  10. 10 CFR 600.250 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention... extend this timeframe. These may include but are not limited to: (1) Final performance or progress report...

  11. 13 CFR 143.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention... extend this timeframe. These may include but are not limited to: (1) Final performance or progress report...

  12. 15 CFR 24.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention... extend this timeframe. These may include but are not limited to: (1) Final performance or progress report...

  13. 14 CFR 1273.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention... extend this timeframe. These may include but are not limited to: (1) Final performance or progress report...

  14. Final Project Closeout Report for Sprint Hydrogen Fuel Cell (HFC) Deployment Project in California, Gulf Coast and Eastern Seaboard Markets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenny, Kevin; Bradley, Dwayne

    2015-09-01

    Sprint is one of the telecommunications industry leaders in the deployment of hydrogen fuel cell (HFC) systems to provide backup power for their mission critical wireless network facilities. With several hundred fuel cells commissioned in California, states in the gulf coast region, and along the upper eastern seaboard. A strong incentive for advancing the integration of fuel cells into the Sprint network came through the award of a Department of Energy (DOE) grant focused on Market Transformation activities for project (EE0000486). This grant was funded by the 2009 American Recovery and Reinvestment Act (ARRA). The funding provided by DOE ($7.295M)more » was allocated to support the installation of 260 new HFC systems, equipped with an on-site refillable Medium Pressure Hydrogen Storage Solution (MPHSS), as well as for the conversion of 21 low pressure hydrogen systems to the MPHSS, in hopes of reducing barriers to market acceptance.« less

  15. Candidate Materials Evaluated for a High-Temperature Stirling Convertor Heater Head

    NASA Technical Reports Server (NTRS)

    Bowman, Randy R.; Ritzert, Frank J.

    2005-01-01

    The Department of Energy and NASA have identified Stirling Radioisotope Generators (SRGs) as a candidate power system for use on long-duration, deep-space science missions and Mars rovers. One of the developments planned for an upgraded version of the current SRG design is to achieve higher efficiency by increasing the overall operating temperature of the system. Currently, the SRG operates with a heater head temperature of 650 C and is fabricated from the nickel-base superalloy 718. The current operating temperature is at the limit of alloy 718 s capability, and any planned increase in temperature will be contingent on identifying a more capable material from which to fabricate the heater head. To this end, personnel at the NASA Glenn Research Center are evaluating advanced materials for a high-temperature heater head to allow a higher convertor temperature ratio and, thus, increase the system efficiency. A generic list of properties that were used to screen the candidate materials follows: (1) creep, (2) fabricability, (3) helium gas containment, (4) long-term stability and compatibility, (5) ability to form a hermetical closeout seal, and (6) ductility and toughness.

  16. KSC-97pc289

    NASA Image and Video Library

    1997-02-11

    STS-82 Mission Specialist Gregory J. Harbaugh prepares to enter the Space Shuttle Discovery at Launch Pad 39A, with the assistance of white room closeout crew members Dave Law, at left, and Travis Thompson

  17. Childhood Brain and Spinal Cord Tumors Treatment Overview

    MedlinePlus

    ... Review & Outcomes Award Issuance Manage Your Award Grants Management Contacts Monitoring Prior Approvals Annual Reporting & Auditing Grant Transfer Grant Closeout Contracts & Small Business Training Cancer Training at NCI (Intramural) Resources for ...

  18. 77 FR 51586 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Release''). \\2\\ Because failure to comply with the close-out requirements of Rule 204(a) is a violation of... NSCC's Envelope Settlement Service or Inter-city Envelope Settlement Service. These activities rarely...

  19. 29 CFR 95.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., FOREIGN GOVERNMENTS, ORGANIZATIONS UNDER THE JURISDICTION OF FOREIGN GOVERNMENTS, AND INTERNATIONAL... as required in § 95.53. (b) After closeout of an award, a relationship created under an award may be...

  20. Thermal Consideration of SWIFT XRT Radiator At-35C or Colder in Low Earth Orbit

    NASA Technical Reports Server (NTRS)

    Choi, Michael K.

    2000-01-01

    The X-Ray Telescope (XRT) is an instrument on the National Aeronautics and Space Administration (NASA) SWIFT spacecraft. The thermoelectric cooler (TEC) for the charge coupled device (CCD) of the XRT requires a radiator temperature of -35 C or colder, and a goal of -55 C to minimize the damage by radiation. The waste heat rejected from the TEC to the radiator is in the 8 W to 20 W range. In the Phase A baseline design, the XRT radiator is mounted to the rear end of the XRT telescope tube and is very close to the bottom closeout of the spacecraft bus. The bottom closeout is multi-layer insulation (MLI) blankets. At sun angles between 90 deg and 180 deg, there is direct solar impingement on the bottom closeout. When the rolls +/- 5 deg, the XRT radiator is exposed to direct solar radiation. The radiator also has a view factor to the solar arrays. The results of thermal analysis showed that the flight temperature prediction of the radiator exceeds the temperature requirement of -35 C substantially at sun angles from 110 deg to 180 deg. A new location on the anti-sun side of the spacecraft is proposed for the radiator. It requires a heat pipe to couple the TEC and the radiator thermally. The results of thermal analysis show that the flight temperature prediction of the proposed radiator meets the temperature requirement at all sun angles.

  1. KSC-2009-2986

    NASA Image and Video Library

    2009-05-08

    CAPE CANAVERAL, Fla. – At Astrotech Space Operations in Titusville, Fla., a technician checks the thermal blanket around the LROC narrow angle camera during closeout on the Lunar Reconnaissance Orbiter, or LRO, before its mating with NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, spacecraft. Above the LROC is the LOLA, which will provide a precise global lunar topographic model and geodetic grid; and top right, the DIVINER, which will measure lunar surface temperatures at scales that provide essential information for future surface operations and exploration. The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020. Launch is targeted for no earlier than June 2 from Cape Canaveral Air Force Station in Florida. Photo credit: NASA/Jack Pfaller

  2. 48 CFR 1852.216-76 - Award fee for service contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award... difference to the Government, as directed by the Contracting Officer. (3) If the Contracting Officer...

  3. 48 CFR 1852.216-76 - Award fee for service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award... difference to the Government, as directed by the Contracting Officer. (3) If the Contracting Officer...

  4. 48 CFR 1852.216-76 - Award fee for service contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... closeout of the contract. This reserve shall not exceed 15 percent of the contract's total potential award... difference to the Government, as directed by the Contracting Officer. (3) If the Contracting Officer...

  5. I-95 Corridor Coalition Project Summary and Closeout

    DOT National Transportation Integrated Search

    2010-12-22

    The Southern Traffic Incident eXchange (STIX) program was implemented on April 1, 2008 to facilitate incident notification/information sharing between the Southern States (Florida, Georgia, North Carolina and South Carolina). The program's intent is ...

  6. 7 CFR 1753.18 - Engineer and architect contract closeout certifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... statement that the construction is complete and was done in accordance with the RUS approved system design or layout or subsequent RUS approved changes. (b) A statement that the construction was for loan...

  7. 7 CFR 1753.18 - Engineer and architect contract closeout certifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... statement that the construction is complete and was done in accordance with the RUS approved system design or layout or subsequent RUS approved changes. (b) A statement that the construction was for loan...

  8. 7 CFR 1753.18 - Engineer and architect contract closeout certifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... statement that the construction is complete and was done in accordance with the RUS approved system design or layout or subsequent RUS approved changes. (b) A statement that the construction was for loan...

  9. 7 CFR 1753.18 - Engineer and architect contract closeout certifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... statement that the construction is complete and was done in accordance with the RUS approved system design or layout or subsequent RUS approved changes. (b) A statement that the construction was for loan...

  10. 7 CFR 1753.18 - Engineer and architect contract closeout certifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... statement that the construction is complete and was done in accordance with the RUS approved system design or layout or subsequent RUS approved changes. (b) A statement that the construction was for loan...

  11. 7 CFR 3015.120 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... audits (See Attachment L, Circular A-102 and Attachment K of Circular A-110) are not a required part of... are problems with a grant or subgrant that require audit attention. If a USDA agency considers a final...

  12. 7 CFR 3015.120 - Closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... audits (See Attachment L, Circular A-102 and Attachment K of Circular A-110) are not a required part of... are problems with a grant or subgrant that require audit attention. If a USDA agency considers a final...

  13. 7 CFR 1944.688 - Grant evaluation, closeout, suspension, and termination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... Law 103-354's appeal procedures under subpart B of part 1900 of this chapter. (d) The grantee will...

  14. STS-79 Mission Specialist Thomas Akers in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-79 Mission Specialist Thomas D. Akers shares a light moment with white room closeout crew members Rick Welty (left) and Travis Thompson, before entering the Space Shuttle Atlantis at Launch Pad 39A.

  15. KSC-97pc287

    NASA Image and Video Library

    1997-02-11

    STS-82 Mission Specialist Steven L. Smith prepares to enter the Space Shuttle Discovery at Launch Pad 39A, with the assistance of white room closeout crew members Dave Law, in front; Carlous Gillis, at left; and James Davis

  16. Closeout of CRADA JSA 2012S004: Chapter 5, Integrated Control System, of the document of the ESS Conceptual Design Report, publicly available at https://europeanspallationsource.se/accelerator-documents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Satogata, Todd

    2013-04-22

    The integrated control system (ICS) is responsible for the whole ESS machine and facility: accelerator, target, neutron scattering instruments and conventional facilities. This unified approach keeps the costs of development, maintenance and support relatively low. ESS has selected a standardised, field-proven controls framework, the Experimental Physics and Industrial Control System (EPICS), which was originally developed jointly by Argonne and Los Alamos National Laboratories. Complementing this selection are best practices and experience from similar facilities regarding platform standardisation, control system development and device integration and commissioning. The components of ICS include the control system core, the control boxes, the BLED databasemore » management system, and the human machine interface. The control system core is a set of systems and tools that make it possible for the control system to provide required data, information and services to engineers, operators, physicists and the facility itself. The core components are the timing system that makes possible clock synchronisation across the facility, the machine protection system (MPS) and the personnel protection system (PPS) that prevent damage to the machine and personnel, and a set of control system services. Control boxes are servers that control a collection of equipment (for example a radio frequency cavity). The integrated control system will include many control boxes that can be assigned to one supplier, such as an internal team, a collaborating institute or a commercial vendor. This approach facilitates a clear division of responsibilities and makes integration much easier. A control box is composed of a standardised hardware platform, components, development tools and services. On the top level, it interfaces with the core control system components (timing, MPS, PPS) and with the human-machine interface. At the bottom, it interfaces with the equipment and parts of the facility through a set of analog and digital signals, real-time control loops and other communication buses. The ICS central data management system is named BLED (beam line element databases). BLED is a set of databases, tools and services that is used to store, manage and access data. It holds vital control system configuration and physics-related (lattice) information about the accelerator, target and instruments. It facilitates control system configuration by bringing together direct input-output controller (IOC) con guration and real-time data from proton and neutron beam line models. BLED also simplifies development and speeds up the code-test-debug cycle. The set of tools that access BLED will be tailored to the needs of different categories of users, such as ESS staff physicists, engineers, and operators; external partner laboratories; and visiting experimental instrument users. The human-machine interface is vital to providing a high-quality experience to ICS users. It encompasses a wide array of devices and software tools, from control room screens to engineer terminal windows; from beam physics data tools to post-mortem data analysis tools. It serves users with a wide range of skills from widely varied backgrounds. The Controls Group is developing a set of user profiles to accommodate this diverse range of use-cases and users.« less

  17. 76 FR 72210 - Notice of Proposed Information Collection: Comment Request Congressional Earmark Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ...-Special Project (EDI-SP) and Neighborhood Initiative (NI) grants. DATES: Comments Due Date: January 23... Neighborhood Initiative (NI) grantees. The agency has used the application, semi-annual reports and close-out...

  18. 7 CFR 1753.30 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Construction of Buildings § 1753.30... 257 (Contract to Construct Buildings) and construction or rehabilitation performed by the force...

  19. 48 CFR 731.109 - Advance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....109 Section 731.109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 731.109 Advance... Special Cost and Contract Close-Out Branch, Office of Acquisition and Assistance. Such advance...

  20. STS-79 Mission Specialist John Blaha in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-79 Mission Specialist John E. Blaha shares a light moment with white room closeout crew members Rick Welty (No. 1) and Jim Davis (right), before entering the Space Shuttle Atlantis at Launch Pad 39A.

  1. Freeform Deposition Method for Coolant Channel Closeout

    NASA Technical Reports Server (NTRS)

    Gradl, Paul R. (Inventor); Reynolds, David Christopher (Inventor); Walker, Bryant H. (Inventor)

    2017-01-01

    A method is provided for fabricating a coolant channel closeout jacket on a structure having coolant channels formed in an outer surface thereof. A line of tangency relative to the outer surface is defined for each point on the outer surface. Linear rows of a metal feedstock are directed towards and deposited on the outer surface of the structure as a beam of weld energy is directed to the metal feedstock so-deposited. A first angle between the metal feedstock so-directed and the line of tangency is maintained in a range of 20-90.degree.. The beam is directed towards a portion of the linear rows such that less than 30% of the cross-sectional area of the beam impinges on a currently-deposited one of the linear rows. A second angle between the beam and the line of tangency is maintained in a range of 5-65 degrees.

  2. Expedition 6 flight engineer Nikolai Budarin in White Room before launch

    NASA Technical Reports Server (NTRS)

    2002-01-01

    KENNEDY SPACE CENTER, FLA. -- In the White Room on Launch Pad 39A, Expedition 6 flight engineer Nikolai Budarin is helped with his launch and entry suit before entering Space Shuttle Endeavour. Closeout Crew members helping are (left) Rene Arriens, United Space Alliance mechanical technician, (right) Danny Wyatt, NASA Quality Assurance specialist, and (background) Rick Welty, United Space Alliance Vehicle Closeout chief. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 23 at 7:50 p.m. EST.

  3. STS-103 MS Smith prepares to enter orbiter from White Room

    NASA Technical Reports Server (NTRS)

    1999-01-01

    STS-103 Mission Specialist Steven L. Smith, in his orange launch and entry suit, waits for assistance from closeout crew members in the White Room before entering the orbiter. From left, they are NASA Quality Assurance Specialist Danny Wyatt, United Space Alliance (USA) Mechanical Technician Vinny Defranzo and USA Orbiter Vehicle Closeout Chief Travis Thompson. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST.

  4. KSC-99pp1480

    NASA Image and Video Library

    1999-12-19

    KENNEDY SPACE CENTER, FLA. -- STS-103 Commander Curtis L. Brown Jr., in his orange launch and entry suit, enjoys a laugh with closeout crew members in the White Room before entering the orbiter. From left are United Space Alliance (USA) Mechanical Technician Rene Arriens, USA Orbiter Vehicle Closeout Chief Travis Thompson, and NASA Quality Assurance Specialist Danny Wyatt. The white room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST

  5. STS-69 Mission Specialist James H. Newman in white room

    NASA Technical Reports Server (NTRS)

    1995-01-01

    At Launch Pad 39A, STS-69 Mission Specialist James H. Newman chats with white room closeout crew members Rene Arriens (far left), Travis Thompson and Bob Saulnier (right) prior to entering the Space Shuttle Endeavour.

  6. United States Environmental Protection Agency Tangible Personal Property Report Disposition Request/Report SF-428- C

    EPA Pesticide Factsheets

    Used by recipients when required to request disposition instructions or to report disposition of Federally-owned property or acquired equipment under Federal assistance awards at any time other than award closeout.

  7. STS-75 Mission Commander Andrew M. Allen in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-75 Mission Commander Andrew M. Allen (center) prepares to enter the Space Shuttle Columbia at Launch Pad 39B with assistance from white room closeout crew members Paul Arnold (left), Dave Law and Bob Saulnier.

  8. 47 CFR Parts 401-499 - [RESERVED

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false [RESERVED] 401 PARTS 401-499 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM Closeout. PARTS 401-499...

  9. Staff experiences of closing out a clinical trial involving withdrawal of treatment: qualitative study.

    PubMed

    Lawton, Julia; White, David; Rankin, David; Elliott, Jackie; Taylor, Carolin; Cooper, Cindy; Heller, Simon; Hallowell, Nina

    2017-02-07

    The ending of a clinical trial may be challenging, particularly if staff are required to withdraw the investigated treatment(s); however, this aspect of trial work is surprisingly under-researched. To address this gap, we explored the experiences of staff involved in closing out a trial that entailed withdrawal of treatment (insulin pumps) from some patients. Interviews were conducted with n = 22 staff, recruited from seven trial sites. Data were analysed thematically. Staff described a myriad of ethical and emotional challenges at closeout, many of which had been unforeseen when the trial began. A key challenge for staff was that, while patients gave their agreement to participate on the understanding that pump treatment could be withdrawn, they often found themselves benefitting from this regimen in ways they could not have foreseen. Hence, as the trial progressed, patients became increasingly anxious about withdrawal of treatment. This situation forced staff to consider whether the consent patients had given at the outset remained valid; it also presented them with a dilemma at closeout because many of those who had wanted to remain on a pump did not meet the clinical criteria required for post-trial funding. When deciding whether to withdraw treatment, staff not only had to take funding pressures and patient distress into account, but they also found themselves caught between an ethic of Hippocratic individualism and one of utilitarianism. These conflicting pressures and ethical considerations resulted in staff decision-making varying across the sites, an issue that some described as a further source of ethical unease. Staff concluded that, had there been more advanced planning and discussion, and greater accountability to an ethics committee, some of the challenges they had confronted at closeout could have been lessened or even prevented. The same kinds of ethical issues that may vex staff at the beginning of a trial (e.g. patients having unrealistic expectations of trial participation; staff experiencing conflicts between research and clinical roles) may re-present themselves at the end. To safeguard the wellbeing of staff and patients, greater planning, coordination and ethical oversight should go into the closeout of trials involving withdrawal of treatment(s). International Standard Randomised Controlled Trials Number (ISRCTN) Registry, ISRCTN61215213 . Registered on 11 May 2011.

  10. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...

  11. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...

  12. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...

  13. KSC-97PC1215

    NASA Image and Video Library

    1997-08-07

    STS-85 Payload Commander N. Jan Davis is assisted with her ascent/reentry flight suit by white room closeout crew members Dave Law (left) and Jack Burritt at Launch Pad 39A before she enters the crew cabin of the Space Shuttle orbiter Discovery

  14. 29 CFR 97.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limited to: (1) Final performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for Reimbursement for Construction Programs (SF-271) (as applicable.) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally...

  15. 36 CFR 1207.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limited to: (1) Final performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for Reimbursement for Construction Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally...

  16. 48 CFR 2027.305-3 - Follow-up by Government.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide the following written determination before final payment and closeout of the contract: (1) No inventions or discoveries were made, (2) No copyrights were secured, produced, or composed, (3) No notices or... any final payment and closing out the contract. ...

  17. 7 CFR 1753.39 - Closeout documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., 1400 Independence Ave., SW., Washington, DC 20250-1522. (d) Grounding system audit. A grounding system audit shall be performed and found acceptable for equipment provided under Form 525 and 545 Contracts... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  18. 7 CFR 246.17 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN State... notify the State agency in writing of the disqualification together with the effective date. A State...

  19. 7 CFR 246.17 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN State... notify the State agency in writing of the disqualification together with the effective date. A State...

  20. STS-82 M.S. Steven Smith in White Room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-82 Mission Specialist Steven L. Smith prepares to enter the Space Shuttle Discovery at Launch Pad 39A, with the assistance of white room closeout crew members Dave Law, in front; Carlous Gillis, at left; and James Davis.

  1. STS-79 Commander William Readdy in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-79 Commander William F. Readdy gets ready to climb into the flight deck of the Space Shuttle Atlantis at Launch Pad 39A. Assisting him are white room closeout crew members Travis Thompson (from left), Jean Alexander and Jim Davis.

  2. Hypertrophic Cardiomyopathy Association

    MedlinePlus

    ... services. Shirt Closeout Sale!!! - Visit our Store to purchase yours today!!! ►►►►►■... Online Shopping Amazon donates 0.5% of the purchase price to Hypertrophic Cardiomyopathy Association. Bookmark the link ...

  3. KSC-97PC1211

    NASA Image and Video Library

    1997-08-07

    STS-85 Commander Curtis L. Brown, Jr. is assisted with his ascent/reentry flight suit by white room closeout crew members Jean Alexander (left) and Chris Meinert at Launch Pad 39A before he enters the crew cabin of the Space Shuttle orbiter Discovery

  4. North Slope (Wahluke Slope) expedited response action cleanup plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part ofmore » the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.« less

  5. Evaluation of dispersion strengthened nickel-base alloy heat shields for space shuttle application

    NASA Technical Reports Server (NTRS)

    Johnson, R., Jr.; Killpatrick, D. H.

    1975-01-01

    The design, fabrication, and testing of a full-size, full-scale TD Ni-20Cr heat shield test array in simulated mission environments is described along with the design and fabrication of two additional full-size, full-scale test arrays to be tested in flowing gas test facilities at the NASA Langley Research Center. Cost and reusability evaluations of TD Ni-20Cr heat shield systems are presented, and weight estimates of a TD Ni-20Cr heat shield system for use on a shuttle orbiter vehicle are made. Safe-line expectancy of a TD Ni-20Cr heat shield system is assessed. Non-destructive test techniques are evaluated to determine their effectiveness in quality assurance checks of TD Ni-20Cr components such as heat shields, heat shield supports, close-out panels, formed cover strips, and edge seals. Results of tests on a braze reinforced full-scale, subsize panel are included. Results show only minor structural degradation in the main TD Ni-20Cr heat shields of the test array during simulated mission test cycles.

  6. KSC-2012-1601

    NASA Image and Video Library

    2012-02-29

    VANDENBERG AIR FORCE BASE, Calif. -- NASA's Nuclear Spectroscopic Telescope Array NuSTAR spacecraft is wrapped in its protective cover and half of its payload fairing is behind it in processing facility 1555 at Vandenberg Air Force Base in California. Technicians are performing fairing closeout work in preparation for fairing installation around the spacecraft, which is scheduled to begin March 2. The cover protecting NuSTAR's delicate instruments will be removed prior to the fairing installation. The fairing will protect the spacecraft from the heat and aerodynamic pressure generated during ascent to orbit aboard an Orbital Sciences Pegasus XL rocket. After processing of the rocket and spacecraft are complete, they will be flown on Orbital's L-1011 carrier aircraft from Vandenberg to the Ronald Reagan Ballistic Missile Defense Test Site on the Pacific Ocean’s Kwajalein Atoll for launch. The high-energy X-ray telescope will conduct a census of black holes, map radioactive material in young supernovae remnants, and study the origins of cosmic rays and the extreme physics around collapsed stars. For more information, visit http://www.nasa.gov/nustar. Photo credit: NASA/Randy Beaudoin, VAFB

  7. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  8. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  9. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  10. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  11. 7 CFR 1726.404 - Non-site specific construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract... equipment is supplied under a construction contract, the borrower (acting through its engineer, if... equipment. The borrower (acting through its engineer, if applicable) will schedule such inspection and...

  12. 7 CFR 3016.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... are not limited to: (1) Final performance or progress report. (2) Financial Status Report (SF 269) or Outlay Report and Request for Reimbursement for Construction Programs (SF-271) (as applicable.) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally...

  13. 40 CFR 31.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Federal agencies may extend this timeframe. These may include but are not limited to: (1) Final... Reimbursement for Construction Programs (SF-271) (as applicable.) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally-owned property report: In accordance...

  14. 45 CFR 2541.500 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Federal agencies may extend this time frame. These may include but are not limited to: (1) Final... Reimbursement for Construction Programs (SF-271) (as applicable); (3) Final request for payment (SF-270) (if applicable); (4) Invention disclosure (if applicable); (5) Federally-owned property report. In accordance...

  15. 38 CFR 43.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Federal agencies may extend this timeframe. These may include but are not limited to: (1) Final... Reimbursement for Construction Programs (SF-271) (as applicable.) (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally-owned property report: In accordance...

  16. 7 CFR 3019.71 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the award. The Federal awarding agency may approve extensions when requested by the recipient. (b) Unless the Federal awarding agency authorizes an extension, a recipient shall liquidate all obligations... Federal awarding agency shall make prompt payments to a recipient for allowable reimbursable costs under...

  17. KSC-97PC1216

    NASA Image and Video Library

    1997-08-07

    STS-85 Mission Specialist Robert L. Curbeam, Jr. is assisted with his ascent/reentry flight suit by white room closeout crew members Mike Mangione (left foreground) and Dave Law at Launch Pad 39A before he enters the crew cabin of the Space Shuttle orbiter Discovery

  18. University of Tennessee Center for Space Transportation and Applied Research (CSTAR)

    NASA Astrophysics Data System (ADS)

    1995-10-01

    The Center for Space Transportation and Applied Research had projects with space applications in six major areas: laser materials processing, artificial intelligence/expert systems, space transportation, computational methods, chemical propulsion, and electric propulsion. The closeout status of all these projects is addressed.

  19. 40 CFR 31.51 - Later disallowances and adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....51 Section 31.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS After-the-Grant Requirements § 31.51 Later disallowances and adjustments. The closeout of a grant...

  20. KSC-03pd0250

    NASA Image and Video Library

    2003-01-16

    KENNEDY SPACE CENTER, FLA. -- Approximately 33 seconds after T-0 and liftoff of Space Shuttle Columbia, several particles are observed falling away from the -Z portion of the LH solid rocket booster ETA ring. Particles were identified later as probably pieces of the instafoam closeout on the ETA ring.

  1. 7 CFR 277.16 - Suspension, disallowance and program closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 277.16 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PAYMENTS OF CERTAIN..., temporarily withhold some or all Federal reimbursements for costs of administration of the Food Stamp Program...

  2. University of Tennessee Center for Space Transportation and Applied Research (CSTAR)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Center for Space Transportation and Applied Research had projects with space applications in six major areas: laser materials processing, artificial intelligence/expert systems, space transportation, computational methods, chemical propulsion, and electric propulsion. The closeout status of all these projects is addressed.

  3. 7 CFR 1753.49 - Closeout documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Distribution Borrower Contractor 724 Final Inventory—Certificate of Completion 2 1 1 724a Final Inventory... representative of the borrower. (2) Final inventory documents. (i) The borrower shall obtain certifications from... prepare and distribute the final inventory documents in accordance with the tables contained in this...

  4. 10 CFR 600.172 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of Higher Education, Hospitals, and Other Nonprofit Organizations After-The-Award Requirements § 600.172 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not... in part with the consent of DOE and the recipient, provided the responsibilities of the recipient...

  5. 23 CFR 1200.34 - Disposition of unexpended balances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Disposition of unexpended balances. 1200.34 Section 1200.34 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION... HIGHWAY SAFETY PROGRAMS Closeout § 1200.34 Disposition of unexpended balances. Any funds which remain...

  6. 23 CFR 1200.34 - Disposition of unexpended balances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Disposition of unexpended balances. 1200.34 Section 1200.34 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION... HIGHWAY SAFETY PROGRAMS Closeout § 1200.34 Disposition of unexpended balances. Any funds which remain...

  7. 48 CFR 3053.204-70 - Administrative matters.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Administrative matters. 3053.204-70 Section 3053.204-70 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... Administrative matters. The following forms are prescribed for use in the closeout of applicable contracts, as...

  8. 48 CFR 3053.204-70 - Administrative matters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Administrative matters. 3053.204-70 Section 3053.204-70 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... Administrative matters. The following forms are prescribed for use in the closeout of applicable contracts, as...

  9. 48 CFR 3053.204-70 - Administrative matters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Administrative matters. 3053.204-70 Section 3053.204-70 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... Administrative matters. The following forms are prescribed for use in the closeout of applicable contracts, as...

  10. 48 CFR 3053.204-70 - Administrative matters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative matters. 3053.204-70 Section 3053.204-70 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... Administrative matters. The following forms are prescribed for use in the closeout of applicable contracts, as...

  11. 48 CFR 3053.204-70 - Administrative matters.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Administrative matters. 3053.204-70 Section 3053.204-70 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... Administrative matters. The following forms are prescribed for use in the closeout of applicable contracts, as...

  12. 17 CFR 300.305 - Excluded contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Excluded contracts. 300.305 Section 300.305 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) Schedule A to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION CORPORATION Closeout Or Completion of Open...

  13. STS-103 MS Smith and MS Clervoy prepare to enter orbiter from White Room

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the White Room, STS-103 Mission Specialists Steven L. Smith and Jean-Francois Clervoy, in their orange launch and entry suits, are getting ready to enter Space Shuttle Discovery. Assisting them are closeout crew members (from left) United Space Alliance (USA) Mechanical Technician Rene Arriens, NASA Quality Assurance Specialist Danny Wyatt, USA Orbiter Vehicle Closeout Chief Travis Thompson and USA Mechanical Technician Vinny Defranzo. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST.

  14. 7 CFR 246.25 - Records and reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... year of food and NSA funds available for expenditure; and, (E) NSA expenditures and unliquidated... information as is necessary for the efficient management of food and NSA funds expenditures. (2) Annual... agencies must submit itemized NSA expenditure reports annually as an addendum to their WIC Program closeout...

  15. 22 CFR 226.70 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose. 226.70 Section 226.70 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS After-the-Award Requirements § 226.70 Purpose. Sections 226.71 through 226.73 contain closeout...

  16. 78 FR 68375 - Removal of Procedures for Closeout of Grants and Cooperative Agreements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ..., Contract Management Division, Washington, DC 20546. Comments may also be submitted by email to: leigh... Procurement, Contract Management Division (Room 2P77); Telephone: (202) 358-0592; Email: [email protected] encouraged to perform retrospective analysis, reviewing existing regulation for outmoded, ineffective...

  17. 45 CFR 602.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agencies may extend this timeframe. These may include but are not limited to: (1) Final performance or... Construction Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally-owned property report: In accordance with § 602.32(f), a...

  18. 29 CFR 1470.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agencies may extend this timeframe. These may include but are not limited to: (1) Final performance or... Construction Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally-owned property report: In accordance with § 1470.32(f...

  19. 45 CFR 92.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agencies may extend this timeframe. These may include but are not limited to: (1) Final performance or... Construction Programs (SF-271) (as applicable). (3) Final request for payment (SF-270) (if applicable). (4) Invention disclosure (if applicable). (5) Federally-owned property report: In accordance with § 92.32(f), a...

  20. Channel Wall Nozzle Hot-fire Tests

    NASA Image and Video Library

    2018-03-16

    A subscale channel wall nozzle is hot-fire tested in November 2017 at NASA's Marshall Space Flight Center. The nozzle was fabricated using three separate, state-of-the-art, advanced manufacturing technologies including a new process called Laser Wire Direct Closeout that was co-developed and advanced at Marshall.

  1. 10 CFR 602.16 - National security.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall... recipient may wish to discontinue the project, in which case the recipient and DOE shall terminate the award..., including DOE officials with whom the recipient normally communicates, except the Director, Office of...

  2. 10 CFR 602.16 - National security.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall... recipient may wish to discontinue the project, in which case the recipient and DOE shall terminate the award..., including DOE officials with whom the recipient normally communicates, except the Director, Office of...

  3. 45 CFR 74.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of... whole or in part with the consent of the HHS awarding agency and the recipient, provided the... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION...

  4. 45 CFR 74.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of... whole or in part with the consent of the HHS awarding agency and the recipient, provided the... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION...

  5. 45 CFR 74.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of... whole or in part with the consent of the HHS awarding agency and the recipient, provided the... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION...

  6. 45 CFR 74.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of... whole or in part with the consent of the HHS awarding agency and the recipient, provided the... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION...

  7. 17 CFR 300.300 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION CORPORATION Closeout Or Completion of Open...) of the Securities Investor Protection Act of 1970, as amended (hereinafter referred to as “the Act... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Definitions. 300.300 Section...

  8. 17 CFR 300.303 - Report to trustee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Report to trustee. 300.303 Section 300.303 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) Schedule A to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION CORPORATION Closeout Or Completion of Open...

  9. 34 CFR 80.50 - Closeout.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... immediately refund to the Federal agency any balance of unobligated (unencumbered) cash advanced that is not authorized to be retained for use on other grants. (Approved by the Office of Management and Budget under..., make upward or downward adjustments to the allowable costs. (d) Cash adjustments. (1) The Federal...

  10. 7 CFR 3430.57 - Project meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project meetings. 3430.57 Section 3430.57 Agriculture...-GENERAL AWARD ADMINISTRATIVE PROVISIONS Post-Award and Closeout § 3430.57 Project meetings. In addition to... facilitate communication and the sharing of project results. These opportunities also serve to eliminate or...

  11. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  12. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  13. 77 FR 24508 - Notice of Submission of Proposed Information Collection to OMB Community Development Block Grant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Proposed Information Collection to OMB Community Development Block Grant (CDBG) Entitlement Program AGENCY... subject proposal. The closeout instructions apply to Community Development Block Grant (CDBG) programs... responses. This notice also lists the following information: Title of Proposal: Community Development Block...

  14. Astronaut Jean-Francois Clervoy in white room on launch pad 39B

    NASA Technical Reports Server (NTRS)

    1994-01-01

    In the white room at Launch Pad 39B, STS-66 mission specialist Jean-Francois Clervoy is assisted with his partial pressure launch/entry suit by close-out crew members Travis Thompson and Danny Wyatt (background) before entering the Space Shuttle Atlantis for its November 3 launch.

  15. 76 FR 31402 - Federal Acquisition Regulation; Contract Closeout

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... identical to DCAA's incurred cost model. Response: Use of the term ``adequate'' for describing the... represented by DCAA within its Model Incurred Cost Proposal rate as stipulated in DCAA Pamphlet No. 7641.90. This respondent further takes the position that use of the DCAA model schedule information eliminates...

  16. 17 CFR 242.204 - Close-out requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... clearing agency in any equity security that is attributable to bona fide market making activities by a registered market maker, options market maker, or other market maker obligated to quote in the over-the-counter market, the participant shall by no later than the beginning of regular trading hours on the third...

  17. 17 CFR 242.204 - Close-out requirement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... clearing agency in any equity security that is attributable to bona fide market making activities by a registered market maker, options market maker, or other market maker obligated to quote in the over-the-counter market, the participant shall by no later than the beginning of regular trading hours on the third...

  18. 17 CFR 242.204 - Close-out requirement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... clearing agency in any equity security that is attributable to bona fide market making activities by a registered market maker, options market maker, or other market maker obligated to quote in the over-the-counter market, the participant shall by no later than the beginning of regular trading hours on the third...

  19. 17 CFR 242.204 - Close-out requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... clearing agency in any equity security that is attributable to bona fide market making activities by a registered market maker, options market maker, or other market maker obligated to quote in the over-the-counter market, the participant shall by no later than the beginning of regular trading hours on the third...

  20. 17 CFR 242.204 - Close-out requirement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... clearing agency in any equity security that is attributable to bona fide market making activities by a registered market maker, options market maker, or other market maker obligated to quote in the over-the-counter market, the participant shall by no later than the beginning of regular trading hours on the third...

  1. 20 CFR 641.440 - What are the responsibility conditions that an applicant must meet?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... an applicant must meet? 641.440 Section 641.440 Employees' Benefits EMPLOYMENT AND TRAINING... Application, Eligibility, and Award Requirements § 641.440 What are the responsibility conditions that an... receipt of closeout package, whichever is later, unless an extension has been requested and granted. (h...

  2. 76 FR 66270 - Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... collection techniques on other forms of information technology. Comments may be sent to: MaryPat Daskal... form is used for generating plant construction or for the furnishing and installation of major items of..., Construction Inventory This form is used to document the final construction in connection with the closeout of...

  3. 24 CFR 570.504 - Program income.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program income. 570.504 Section 570... income. (a) Recording program income. The receipt and expenditure of program income as defined in § 570... of program income received by recipients. (1) Program income received before grant closeout may be...

  4. 10 CFR 605.18 - National security.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...). However, if in the opinion of the recipient or DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall notify the other in writing immediately. If the recipient... disposition. If the recipient and DOE wish to continue the award, even though classified information is...

  5. 10 CFR 600.361 - Closeout procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Unless DOE authorizes an extension, a recipient must liquidate all obligations incurred under the award... completion of the award, all reports required by the terms and conditions of the award. DOE may approve... specified in the terms and conditions of the award or in agency implementing instructions. (2) DOE must make...

  6. 45 CFR 2543.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 2543.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following: (1... in whole or in part with the consent of the Federal awarding agency and the recipient, provided the...

  7. 7 CFR 3019.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ORGANIZATIONS After-the-Award Requirements § 3019.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 3019.73...

  8. 10 CFR 600.361 - Closeout procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Unless DOE authorizes an extension, a recipient must liquidate all obligations incurred under the award... completion of the award, all reports required by the terms and conditions of the award. DOE may approve... specified in the terms and conditions of the award or in agency implementing instructions. (2) DOE must make...

  9. 7 CFR 3019.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ORGANIZATIONS After-the-Award Requirements § 3019.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 3019.73...

  10. 38 CFR 49.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 49.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not... or ended in whole or in part with the consent of the Federal awarding agency and the recipient...

  11. 45 CFR 2543.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 2543.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following: (1... in whole or in part with the consent of the Federal awarding agency and the recipient, provided the...

  12. 10 CFR 600.361 - Closeout procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Unless DOE authorizes an extension, a recipient must liquidate all obligations incurred under the award... completion of the award, all reports required by the terms and conditions of the award. DOE may approve... specified in the terms and conditions of the award or in agency implementing instructions. (2) DOE must make...

  13. 7 CFR 3019.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ORGANIZATIONS After-the-Award Requirements § 3019.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 3019.73...

  14. 10 CFR 600.361 - Closeout procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Unless DOE authorizes an extension, a recipient must liquidate all obligations incurred under the award... completion of the award, all reports required by the terms and conditions of the award. DOE may approve... specified in the terms and conditions of the award or in agency implementing instructions. (2) DOE must make...

  15. 7 CFR 3019.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ORGANIZATIONS After-the-Award Requirements § 3019.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 3019.73...

  16. 41 CFR 105-72.802 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-the-Award Requirements § 105-72.802 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to... Federal awarding agency and the recipient, provided the responsibilities of the recipient referred to in...

  17. 7 CFR 3019.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ORGANIZATIONS After-the-Award Requirements § 3019.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 3019.73...

  18. 10 CFR 605.18 - National security.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...). However, if in the opinion of the recipient or DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall notify the other in writing immediately. If the recipient... disposition. If the recipient and DOE wish to continue the award, even though classified information is...

  19. 10 CFR 600.361 - Closeout procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Unless DOE authorizes an extension, a recipient must liquidate all obligations incurred under the award... completion of the award, all reports required by the terms and conditions of the award. DOE may approve... specified in the terms and conditions of the award or in agency implementing instructions. (2) DOE must make...

  20. 2 CFR 215.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) After-the-Award Requirements § 215.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not... or ended in whole or in part with the consent of the Federal awarding agency and the recipient...

  1. 38 CFR 49.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 49.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not... or ended in whole or in part with the consent of the Federal awarding agency and the recipient...

  2. 29 CFR 4041A.43 - Benefit forms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Benefit forms. 4041A.43 Section 4041A.43 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION OF MULTIEMPLOYER PLANS Closeout of Sufficient Plans § 4041A.43 Benefit forms. (a) General rule. Except as provided...

  3. 29 CFR 4041A.43 - Benefit forms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Benefit forms. 4041A.43 Section 4041A.43 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION OF MULTIEMPLOYER PLANS Closeout of Sufficient Plans § 4041A.43 Benefit forms. (a) General rule. Except as provided...

  4. 29 CFR 4041A.43 - Benefit forms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Benefit forms. 4041A.43 Section 4041A.43 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION OF MULTIEMPLOYER PLANS Closeout of Sufficient Plans § 4041A.43 Benefit forms. (a) General rule. Except as provided...

  5. 29 CFR 4041A.43 - Benefit forms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Benefit forms. 4041A.43 Section 4041A.43 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION OF MULTIEMPLOYER PLANS Closeout of Sufficient Plans § 4041A.43 Benefit forms. (a) General rule. Except as provided...

  6. 29 CFR 4041A.43 - Benefit forms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Benefit forms. 4041A.43 Section 4041A.43 Labor Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION OF MULTIEMPLOYER PLANS Closeout of Sufficient Plans § 4041A.43 Benefit forms. (a) General rule. Except as provided...

  7. 7 CFR 1944.426 - Grant closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... appropriate, he/she will promptly inform the grantee by the use of exhibit B-3 of subpart B of part 1900 of... 1900 of this chapter. (d) Grant termination. The State Director may terminate the grant agreement...

  8. 48 CFR 2027.305-3 - Follow-up by Government.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Follow-up by Government... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 2027.305-3 Follow-up by Government. (a) The contracting officer shall, as a part of the closeout of a...

  9. 48 CFR 2027.305-3 - Follow-up by Government.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Follow-up by Government... GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 2027.305-3 Follow-up by Government. (a) The contracting officer shall, as a part of the closeout of a...

  10. 14 CFR 152.213 - Grant closeout requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (a) Program income. Sponsors or planning agencies that are units of local government shall return all... purpose of determining the net costs on which the Federal share of costs will be based. (b) Financial reports. The sponsor or planning agency shall furnish, within 90 days after completion of all items in a...

  11. 17 CFR 300.304 - Retained rights of brokers or dealers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Retained rights of brokers or dealers. 300.304 Section 300.304 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) Schedule A to Part 285 RULES OF THE SECURITIES INVESTOR PROTECTION CORPORATION Closeout Or...

  12. 48 CFR 731.770 - OMB Circular A-122, cost principles for nonprofit organizations; USAID implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 731.770 OMB Circular A-122, cost principles... and Assistance, has been so designated. The Overhead and Special Cost and Contract Close-Out Branch...

  13. 48 CFR 731.770 - OMB Circular A-122, cost principles for nonprofit organizations; USAID implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit Organizations 731.770 OMB Circular A-122, cost principles... and Assistance, has been so designated. The Overhead and Special Cost and Contract Close-Out Branch...

  14. 17 CFR 300.400 - Satisfaction of customer claims for standardized options.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Satisfaction of customer... CORPORATION Closeout Or Completion of Open Contractual Commitments § 300.400 Satisfaction of customer claims... direct payment procedure pursuant to section 10 of the Act, in satisfaction of a claim based upon...

  15. 7 CFR 3430.57 - Project meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project meetings. 3430.57 Section 3430.57 Agriculture... Post-Award and Closeout § 3430.57 Project meetings. In addition to reviewing (and monitoring the status... sharing of project results. These opportunities also serve to eliminate or minimize NIFA funding unneeded...

  16. 7 CFR 3430.57 - Project meetings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project meetings. 3430.57 Section 3430.57 Agriculture... Post-Award and Closeout § 3430.57 Project meetings. In addition to reviewing (and monitoring the status... sharing of project results. These opportunities also serve to eliminate or minimize NIFA funding unneeded...

  17. 7 CFR 3015.121 - Amounts payable to the Federal government.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Amounts payable to the Federal government. 3015.121... Closeout, Suspension and Termination § 3015.121 Amounts payable to the Federal government. The following... government. They shall, if not paid upon demand, be subject to recovery by the awarding agency from the...

  18. 7 CFR 3015.121 - Amounts payable to the Federal government.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Amounts payable to the Federal government. 3015.121... Closeout, Suspension and Termination § 3015.121 Amounts payable to the Federal government. The following... government. They shall, if not paid upon demand, be subject to recovery by the awarding agency from the...

  19. 24 CFR 570.426 - Program income.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program income. 570.426 Section 570... in Hawaii and Insular Areas Programs § 570.426 Program income. (a) The provisions of § 570.504(b) apply to all program income generated by a specific grant and received prior to grant closeout. (b) If...

  20. 2 CFR 215.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ORGANIZATIONS (OMB CIRCULAR A-110) After-the-Award Requirements § 215.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following: (1) The right of the Federal... awarding agency and the recipient, provided the responsibilities of the recipient referred to in paragraph...

  1. 49 CFR 19.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 19.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to disallow costs and recover funds on the basis of a later audit or other review. (2) The...

  2. 2 CFR 215.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ORGANIZATIONS (OMB CIRCULAR A-110) After-the-Award Requirements § 215.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following: (1) The right of the Federal... awarding agency and the recipient, provided the responsibilities of the recipient referred to in paragraph...

  3. 49 CFR 19.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 19.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to disallow costs and recover funds on the basis of a later audit or other review. (2) The...

  4. 43 CFR 12.972 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Organizations After-The-Award Requirements § 12.972 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 12.973(a...

  5. 41 CFR 105-72.802 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-the-Award Requirements § 105-72.802 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 105-72...

  6. 22 CFR 226.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS After-the-Award Requirements § 226.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following... review. (2) The obligation of the recipient to return any funds due as a result of later refunds...

  7. 43 CFR 12.972 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Organizations After-The-Award Requirements § 12.972 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 12.973(a...

  8. 41 CFR 105-72.802 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-the-Award Requirements § 105-72.802 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 105-72...

  9. 22 CFR 518.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ORGANIZATIONS After-the-Award Requirements § 518.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 518.73(a...

  10. 22 CFR 518.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ORGANIZATIONS After-the-Award Requirements § 518.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding... awarding agency and the recipient, provided the responsibilities of the recipient referred to in § 518.73(a...

  11. 49 CFR 19.72 - Subsequent adjustments and continuing responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... NON-PROFIT ORGANIZATIONS After-the-Award Requirements § 19.72 Subsequent adjustments and continuing responsibilities. (a) The closeout of an award does not affect any of the following. (1) The right of the Federal awarding agency to disallow costs and recover funds on the basis of a later audit or other review. (2) The...

  12. CIR fuel reservoir swap closeout

    NASA Image and Video Library

    2014-08-11

    ISS040-E-090493 (11 Aug. 2014) --- NASA astronaut Reid Wiseman, Expedition 40 flight engineer, performs routine in-flight maintenance on the Multi-user Drop Combustion Apparatus (MDCA) inside the Combustion Integrated Rack (CIR) in the Destiny laboratory of the International Space Station. The MDCA contains hardware and software to conduct unique droplet combustion experiments in space.

  13. CIR fuel reservoir swap closeout

    NASA Image and Video Library

    2014-08-11

    ISS040-E-090497 (11 Aug. 2014) --- NASA astronaut Reid Wiseman, Expedition 40 flight engineer, performs routine in-flight maintenance on the Multi-user Drop Combustion Apparatus (MDCA) inside the Combustion Integrated Rack (CIR) in the Destiny laboratory of the International Space Station. The MDCA contains hardware and software to conduct unique droplet combustion experiments in space.

  14. CIR fuel reservoir swap closeout

    NASA Image and Video Library

    2014-08-11

    ISS040-E-090482 (11 Aug. 2014) --- NASA astronaut Reid Wiseman, Expedition 40 flight engineer, performs routine in-flight maintenance on the Multi-user Drop Combustion Apparatus (MDCA) inside the Combustion Integrated Rack (CIR) in the Destiny laboratory of the International Space Station. The MDCA contains hardware and software to conduct unique droplet combustion experiments in space.

  15. CIR fuel reservoir swap closeout

    NASA Image and Video Library

    2014-08-11

    ISS040-E-090484 (11 Aug. 2014) --- NASA astronaut Reid Wiseman, Expedition 40 flight engineer, performs routine in-flight maintenance on the Multi-user Drop Combustion Apparatus (MDCA) inside the Combustion Integrated Rack (CIR) in the Destiny laboratory of the International Space Station. The MDCA contains hardware and software to conduct unique droplet combustion experiments in space.

  16. Transient Responses in Ecosystem Free-air CO2 Enrichment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiai Lou

    2002-10-23

    OAK - 270 There is no final report on this grant, P.I. has transferred from DRI to the Univ. of Oklahoma. Per the Doe Project Officer - Roger C. Dahlman, PhD he agrees to waive the report because of such a short period of funding. Waiver from DOE Project Mgr attached to closeout file.

  17. 77 FR 30366 - Defense Federal Acquisition Regulation Supplement: Contingency Contract Closeout (DFARS Case 2012...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 204 RIN 0750-AH71 Defense...: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to require...

  18. 7 CFR 2500.056 - Civil rights.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Civil rights. 2500.056 Section 2500.056 Agriculture... Closeout § 2500.056 Civil rights. Awardees must comply with the civil rights requirements of 7 CFR part 15, subpart A—USDA implementation of Title VI of the Civil Rights Act of 1964, as amended. In accordance, no...

  19. 7 CFR 2500.056 - Civil rights.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Civil rights. 2500.056 Section 2500.056 Agriculture... Closeout § 2500.056 Civil rights. Awardees must comply with the civil rights requirements of 7 CFR part 15, subpart A—USDA implementation of Title VI of the Civil Rights Act of 1964, as amended. In accordance, no...

  20. 7 CFR 2500.056 - Civil rights.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Civil rights. 2500.056 Section 2500.056 Agriculture... Closeout § 2500.056 Civil rights. Awardees must comply with the civil rights requirements of 7 CFR part 15, subpart A—USDA implementation of Title VI of the Civil Rights Act of 1964, as amended. In accordance, no...

  1. Starlite Workplace Literacy Program. Final Closeout Performance Report.

    ERIC Educational Resources Information Center

    Reyes, Lolita C.

    The Star Team Acquiring Rewards in Literacy and Insights Through Education (STARLITE) program was implemented to improve the job proficiency of employees at the Pacific Star Hotel, Guam. Its goal was to provide employees with both workplace literacy skills and employability skills. An audit was completed in each department of the hotel. Modules…

  2. Closeout Report: Experimental High Energy Physics Group at the University of South Alabama

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenkins, Charles M; Godang, Romulus

    The High Energy Physics group at the University of South Alabama has been supported by this research grant (DE-FG02-96ER40970) since 1996. One researcher, Dr. Merrill Jenkins, has been supported on this grant during this time worked on fixed target experiments at the Fermi National Accelerator Laboratory, west of Chicago, Illinois. These experiments have been E-705, E-771, E-871 (HyperCP) and E-921 (CKM) before it was canceled for budgetary reasons. After the cancellation of CKM, Dr. Jenkins joined the Compact Muon Solenoid (CMS) experiment as an associate member via the High Energy Physics Group at the Florida State University. A second, recentlymore » tenured faculty member, Dr. Romulus Godang joined the group in 2009 and has been supported by this grant since then. Dr. Godang is working on the BaBaR experiment at SLAC and has joined the Belle-II experiment located in Japan at KEK. According to the instructions sent to us by our grant monitor, we are to concentrate on the activities over the last three years in this closeout report.« less

  3. Close-out report with links to abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marmar, Earl S.

    This grant provided A/V support for two technical meetings of the Edge Coordinating Committee: (1) Nov 13, 2013 (co-located with the APS-DPP meeting in Denver, CO) https://ecc.mit.edu/fall-2013-technical-meeting#overlay-context=ecc-meetings; (2) April 28-May 1, 2015 (embedded sessions in the Transport Task Force Meeting, Salem, MA) http://www-internal.psfc.mit.edu/TTF2015/index.html. The ultimate goal of the U.S. Transport Task Force is to develop a physics-based understanding of particle, momentum and heat transport in magnetic fusion devices. This understanding should be of sufficient depth that it allows the development of predictive models of plasma transport that can be validated against experiment, and then used to anticipate the future performancemore » of burning plasmas in ITER, as well as to provide guidance for the design of next-step fusion nuclear science facilities. To achieve success in transport science, it is essential to characterize local fluctuations and transport in toroidal plasmas, to understand the basic mechanisms responsible for transport, and ultimately to control these transport processes. These goals must be pursued in multiple areas, and these topics evolve in order to reflect current interests.« less

  4. Sodium Heat Pipe Module Processing For the SAFE-100 Reactor Concept

    NASA Technical Reports Server (NTRS)

    Martin, James; Salvail, Pat

    2003-01-01

    To support development and hardware-based testing of various space reactor concepts, the Early Flight Fission-Test Facility (EFF-TF) team established a specialized glove box unit with ancillary systems to handle/process alkali metals. Recently, these systems have been commissioned with sodium supporting the fill of stainless steel heat pipe modules for use with a 100 kW thermal heat pipe reactor design. As part of this effort, procedures were developed and refined to govern each segment of the process covering: fill, leak check, vacuum processing, weld closeout, and final "wet in". A series of 316 stainless steel modules, used as precursors to the actual 321 stainless steel modules, were filled with 35 +/- 1 grams of sodium using a known volume canister to control the dispensed mass. Each module was leak checked to less than10(exp -10) std cc/sec helium and vacuum conditioned at 250 C to assist in the removal of trapped gases. A welding procedure was developed to close out the fill stem preventing external gases from entering the evacuated module. Finally the completed modules were vacuum fired at 750 C allowing the sodium to fully wet the internal surface and wick structure of the heat pipe module.

  5. Sodium Heat Pipe Module Processing For the SAFE-100 Reactor Concept

    NASA Astrophysics Data System (ADS)

    Martin, James; Salvail, Pat

    2004-02-01

    To support development and hardware-based testing of various space reactor concepts, the Early Flight Fission-Test Facility (EFF-TF) team established a specialized glove box unit with ancillary systems to handle/process alkali metals. Recently, these systems have been commissioned with sodium supporting the fill of stainless steel heat pipe modules for use with a 100 kW thermal heat pipe reactor design. As part of this effort, procedures were developed and refined to govern each segment of the process covering: fill, leak check, vacuum processing, weld closeout, and final ``wet in''. A series of 316 stainless steel modules, used as precursors to the actual 321 stainless steel modules, were filled with 35 +/-1 grams of sodium using a known volume canister to control the dispensed mass. Each module was leak checked to <10-10 std cc/sec helium and vacuum conditioned at 250 °C to assist in the removal of trapped gases. A welding procedure was developed to close out the fill stem preventing external gases from entering the evacuated module. Finally the completed modules were vacuum fired at 750 °C allowing the sodium to fully wet the internal surface and wick structure of the heat pipe module.

  6. Development of Army Facility Functionality Assessment Criteria and Procedures

    DTIC Science & Technology

    2010-09-01

    critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion

  7. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or operable units'' to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  8. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or ``operable units`` to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  9. KSC-2009-2989

    NASA Image and Video Library

    2009-05-08

    CAPE CANAVERAL, Fla. – At Astrotech Space Operations in Titusville, Fla., technicians photograph the Lunar Reconnaissance Orbiter, or LRO, during closeout before its mating with NASA's Lunar CRater Observation and Sensing Satellite, known as LCROSS, spacecraft. Instruments on the LRO include the LEND that will measure the flux of neutrons from the moon; the LROC, a narrow angle camera that will provide panchromatic images; the LOLA, which will provide a precise global lunar topographic model and geodetic grid; and top right, the DIVINER, which will measure lunar surface temperatures at scales that provide essential information for future surface operations and exploration; and at top, the CRaTER, which will characterize the global lunar radiation environment and its biological impacts. At right is the solar panel. The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020. Launch is targeted for no earlier than June 2 from Cape Canaveral Air Force Station in Florida. Photo credit: NASA/Jack Pfaller

  10. 23 CFR 1200.31 - Extension of the right to incur costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Extension of the right to incur costs. 1200.31 Section... HIGHWAY SAFETY PROGRAMS Closeout § 1200.31 Extension of the right to incur costs. Upon written request by the State, specifying the reasons therefor, the Approving Official may extend the right to incur costs...

  11. Forest Resources of East Oklahoma, 2008

    Treesearch

    Richard A. Harper; Tony G. Johnson

    2012-01-01

    The Forest Inventory and Analysis Program conducted the seventh survey of east Oklahoma forests. This was the establishment of the annual plot methodology and closeout of the prism remeasurement plots. Forest land area remained stable at 5.7 million acres and covered almost 57 percent of the land area. About 5.1 million acres of forest land was considered timberland...

  12. 78 FR 77523 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... close-out the position even at the $1 cabinet price (e.g., the series might be quoted no bid). \\5... Rule 968NY the transactions will be exempt from the Consolidated Options Audit Trail (``COATS... maintain quotation, order and transaction information for the transactions in the same format as the COATS...

  13. 78 FR 77536 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... close-out the position even at the $1 cabinet price (e.g., the series might be quoted no bid). \\5... 6.80, the transactions will be exempt from the Consolidated Options Audit Trail (``COATS... maintain quotation, order and transaction information for the transactions in the same format as the COATS...

  14. 77 FR 30572 - Self-Regulatory Organizations; NYSE Amex LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... close-out the position even at the $1 cabinet price (e.g., the series might be quoted no bid). \\5... Rule 968NY the transactions will be exempt from the Consolidated Options Audit Trail (``COATS... maintain quotation, order and transaction information for the transactions in the same format as the COATS...

  15. 75 FR 70708 - Palisades Nuclear Plant; Notice of Consideration of Issuance of Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant... (NRC, the Commission) is considering issuance of an amendment to Facility Operating License No. DPR-20... PNP Renewed Facility Operating License. The change would remove the name of the former operator of the...

  16. Ultra violet disinfection: A 3-year history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tubesing, R.R.; Lindeke, D.R.

    1998-07-01

    The Stillwater Wastewater Treatment Facility is one of nine wastewater treatment facilities operated by the Metropolitan Council Environmental Services in the Minneapolis-St. Paul Metropolitan Area. The facility services the cities of Stillwater, Oak Park Heights, and Bayport. In 1993, an ultra violet disinfection facility began operation to provide the disinfection for the Facility. This presentation discusses the reasons for using ultra violet disinfection in lieu of chlorination/dechlorination facilities, the operating performance, and operating cost factors.

  17. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  18. 34 CFR 395.1 - Terms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...

  19. 34 CFR 395.1 - Terms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...

  20. 34 CFR 395.1 - Terms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... machine or a vending facility on the same premises as a vending facility operated by a blind vendor, except that vending machines or vending facilities operated in areas serving employees the majority of... time required to patronize the vending facility) to the vending facility operated by a blind vendor...