DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
2006-09-01
This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-02-21
This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada
This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-08-01
The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.
1989-05-01
20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-03-17
The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closuremore » documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.« less
Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less
2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. T. Lindsey, A. L. Johnson
2010-09-30
This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.
2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
West, W. J.; Lucas, J. G.; Gano, K. A.
2011-11-14
This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.
Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reboul, S. H.; DiPrete, D. P.
2016-12-12
This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dosemore » associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The purpose of this CR is to document that the closure of CAU 5 complied with the NDEP-approved CAP closure requirements (NNSA/NSO, 2004). The closure activities specified in the CAP were based on the recommendations presented in the corrective action decision document (CADD) (NNSA/NSO, 2003). ROTC 1: The UR form was updated to the current format to include a. more detailed description of the UR and maintenance requirements. Information was edited due to the change of UR signs at the site to UR monuments/signs. The maintenance frequency was changed to annually because sign damage due to high winds was evidencedmore » during recent site inspections. The coordinates for the UR were originally based on NAD 27 and were modified to NAD 83 to comply with the most recent M&O database requirements. The modifications identified in this ROTC will supersede the existing posting requirements for the UR at CASs 06-1S-02 and 06-15-03 as identified in the CAU 5 CADD; CAU 5 CR; and the UR form associated with CASs 06-15-02 and 06-15-03.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
PRIGNANO, A.L.
2003-06-25
This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
IT Coroporation, Las Vegas, NV
2002-04-17
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 405, Area 3 Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. Located on the Tonopah Test Range (TTR) approximately 235 miles north of Las Vegas, Nevada, CAU 405 consists of three Corrective Action Sites (CASs): 03-05-002-SW03, Septic Waste System (aka: Septic Waste System [SWS] 3); 03-05-002-SW04, Septic Waste System (aka: SWS 4); 03-05-002-SW07, Septic Waste System (aka: SWS 7). The CADD and CR have been combined into one report because no further action is recommended for this CAU, and this reportmore » provides specific information necessary to support this recommendation. The CAU consists of three leachfields and associated collection systems that were installed in or near Area 3 for wastewater disposal. These systems were used until a consolidated sewer system was installed in 1990. Historically, operations within various buildin gs in and near Area 3 of the TTR generated sanitary and industrial wastewaters. There is a potential that contaminants of concern (COCs) were present in the wastewaters and were disposed of in septic tanks and leachfields. The justification for closure of this CAU without further action is based on process knowledge and the results of the investigative activities. Closure activities were performed at these CASs between January 14 and February 2, 2002, and included the removal and proper disposal of media containing regulated constituents and proper closure of septic tanks. No further action is appropriate because all necessary activities have been completed. No use restrictions are required to be imposed for these sites since the investigation showed no evidence of COCs identified in the soil for CAU 405.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kidman, Raymond; Matthews, Patrick
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.
ERIC Educational Resources Information Center
Gross, Rosalind L.; White, Harry E.
This publication describes a selected group of child-resistant closures used in packaging five categories of medicine and household products. The material in the document was collected to train survey personnel to identify closures for a planned household study of the effectiveness of child-resistant packaging. The 39 closures described are of…
Base Realignment and Closure (BRAC) Cleanup Plan
1995-01-01
remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boehlecke, R. F.
This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-12-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-06-27
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-11-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.
ICPP tank farm closure study. Volume 2: Engineering design files
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Kauss
2011-06-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
2015-03-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sloop, Christy
2013-04-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. T. Lindsey; K. A. Gano
2008-09-30
The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerry L. Nisson
2012-10-01
This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”
78 FR 20625 - Extension of Hearing Record Closure Date
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Extension of Hearing Record Closure Date AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Extension of hearing record closure date. SUMMARY: The Defense Nuclear Facilities Safety Board (Board) published a document in the Federal Register on January 22, 2013...
77 FR 65871 - Extension of Hearing Record Closure Date
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Extension of Hearing Record Closure Date AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Extension of hearing record closure date. SUMMARY: The Defense Nuclear Facilities Safety Board (Board) published a document in the Federal Register on August 15, 2012...
78 FR 1206 - Second Extension of Hearing Record Closure Date
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Second Extension of Hearing Record Closure Date AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Second extension of hearing record closure date. SUMMARY: The Defense Nuclear Facilities Safety Board (Board) published a document in the Federal Register on...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-04-01
Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
2008-10-01
This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.
2007 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. A. Gano; C. T. Lindsey
2007-09-27
The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2007 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 3 bat habitat mitigation projects.
DOT National Transportation Integrated Search
2008-09-01
This report documents the economic impact analysis undertaken by WSDOTs Freight Systems Division in response to the : storm-related closures of I-5 and I-90 in the winter 2007-2008. The closures were the result of severe weather that : overwhelmed...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Uscher-Pines, Lori; Schwartz, Heather L; Ahmed, Faruque; Zheteyeva, Yenlik; Meza, Erika; Baker, Garrett; Uzicanin, Amra
2018-03-27
During an evolving influenza pandemic, community mitigation strategies, such as social distancing, can slow down virus transmission in schools and surrounding communities. To date, research on school practices to promote social distancing in primary and secondary schools has focused on prolonged school closure, with little attention paid to the identification and feasibility of other more sustainable interventions. To develop a list and typology of school practices that have been proposed and/or implemented in an influenza pandemic and to uncover any barriers identified, lessons learned from their use, and documented impacts. We conducted a review of the peer-reviewed and grey literature on social distancing interventions in schools other than school closure. We also collected state government guidance documents directed to local education agencies or schools to assess state policies regarding social distancing. We collected standardized information from each document using an abstraction form and generated descriptive statistics on common plan elements. The document review revealed limited literature on school practices to promote social distancing, as well as limited incorporation of school practices to promote social distancing into state government guidance documents. Among the 38 states that had guidance documents that met inclusion criteria, fewer than half (42%) mentioned a single school practice to promote social distancing, and none provided any substantive detail about the policies or practices needed to enact them. The most frequently identified school practices were cancelling or postponing after-school activities, canceling classes or activities with a high rate of mixing/contact that occur within the school day, and reducing mixing during transport. Little information is available to schools to develop policies and procedures on social distancing. Additional research and guidance are needed to assess the feasibility and effectiveness of school practices to promote social distancing.
Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2012-08-15
This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justificationmore » and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.« less
Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ziock, Robert; Little, Bonnie Colleen
The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
2006 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
A. L. Johnson; K. A. Gano
2006-10-03
The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. One of the objectives of restoration is the revegetation of remediated waste sites to stabilize the soil and restore the land to native vegetation. The report documents the results of revegetation and mitigation monitoring conducted in 2006 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 2 bat habitat mitigation projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-08-01
Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister and Patrick Matthews
2012-11-01
The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark H.
2012-07-01
The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA providesmore » the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
Proposed GTA welding specification and acceptance criteria for the MC4163
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kwiatkowski, J.J.
1991-04-12
This specification documents the gas tungsten arc (GTA) welding process and production weld acceptance criteria requirements for the MC4163. This document is written specifically to apply to the welds on the MC4163 and is not to be used as a general gas tungsten arc welding specification. All sections of this specification must be complied with unless specifically exempted in writing. There are a total of five welds with three different joint designs required to fabricate the MC4163. In the order of fabrication they are (1) initiator closure disc, (2) nozzle to case girth welds, two and, (3) nozzle closure discmore » welds, two. This specification will only address the nozzle to case girth welds and the nozzle closure disc welds.« less
Nevada National Security Site Industrial Sites Project Closeout - 12498
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cabble, Kevin; Krauss, Mark; Matthews, Pat
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)« less
A Political Analysis of Community Influence over School Closure
ERIC Educational Resources Information Center
Finnigan, Kara S.; Lavner, Mark
2012-01-01
This study seeks to understand community member participation in and influence over an urban school district's school closure process. Data from interviews with School Board members, district administrators, and community members, as well as district documents and newspaper articles suggest that district administrators limited participation…
DOT National Transportation Integrated Search
2014-04-01
This report describes the methodology and results of analyses performed to identify and evaluate : alternative methods to control traffic entering a lane closure on a two-lane, two-way road from low-volume : access points. Researchers documented the ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
Buckius, Christine; Albert, Simon; Tibbetts, Ian; Udy, James
2010-05-01
A marked decline in the contribution by Marovo Lagoon to the annual total bêche-de-mer production of the Solomon Islands from 58% in 1989 to 17% in 2003 prompted investigation of their current biomass and diversity. We also assessed changes to critical ecological services and the prospects for population recovery following a fisheries closure. Day time and nocturnal transects revealed a mean abundance of 32.4 (SD = 5.3) low value species per ha (e.g. Holothuria atra, H. edulis, H. coluber and Thelenota anax) and 15.2 (SD = 2.7) high value species per ha (e.g. H. fuscogilva, Actinopyga lecanora, Stichopus hermanni and Thelenota ananas). Following a 17 month closure of the fishery (2005-2007), the abundance of bêche-de-mer was reported by local fisherman to have increased; however, no scientific studies were conducted that can substantiate this community held belief. The current study aimed to document the impact of re-opening the fishery in 2007 and documented a decline in high value species of 9% over a 5 month period following the opening of the fishery, while low value species continued to increase in abundance by 11%, over the same period based on nocturnal surveys. Continued observation of the recovery, post closure, and any subsequent harvest in Marovo will be required to properly understand population dynamics and provide a sustainable harvest plan for bêche-de-mer in the future.
NASA Astrophysics Data System (ADS)
Buckius, Christine; Albert, Simon; Tibbetts, Ian; Udy, James
2010-05-01
A marked decline in the contribution by Marovo Lagoon to the annual total bêche-de-mer production of the Solomon Islands from 58% in 1989 to 17% in 2003 prompted investigation of their current biomass and diversity. We also assessed changes to critical ecological services and the prospects for population recovery following a fisheries closure. Day time and nocturnal transects revealed a mean abundance of 32.4 (SD = 5.3) low value species per ha (e.g. Holothuria atra, H. edulis, H. coluber and Thelenota anax) and 15.2 (SD = 2.7) high value species per ha (e.g. H. fuscogilva, Actinopyga lecanora, Stichopus hermanni and Thelenota ananas). Following a 17 month closure of the fishery (2005-2007), the abundance of bêche-de-mer was reported by local fisherman to have increased; however, no scientific studies were conducted that can substantiate this community held belief. The current study aimed to document the impact of re-opening the fishery in 2007 and documented a decline in high value species of 9% over a 5 month period following the opening of the fishery, while low value species continued to increase in abundance by 11%, over the same period based on nocturnal surveys. Continued observation of the recovery, post closure, and any subsequent harvest in Marovo will be required to properly understand population dynamics and provide a sustainable harvest plan for bêche-de-mer in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less
The purpose of this document is to improve the current "state of the art" and "state of the science" of soil venting application. A strategy is proposed for venting closure. A vadose zone paradigm is developed to dynamically link the performance of ground-water remediation to va...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
...: Tissue Adhesive With Adjunct Wound Closure Device Intended for the Topical Approximation of Skin... Document: Tissue Adhesive with Adjunct Wound Closure Device Intended for the Topical Approximation of Skin... intended for the topical approximation of skin may comply with the requirement of special controls for...
Engineering study for closure of 209E facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brevick, C.H.; Heys, W.H.; Johnson, E.D.
1997-07-07
This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.
Structural and functional maturation of rat gastrointestinal barrier with thyroxine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Israel, E.J.; Pang, K.Y.; Harmatz, P.R.
It has been noted that the closure of the intestinal barrier to immunoglobulins is a normal maturational process in the rat. It has also been noted that the microvillus membrane (MVM) of newborn animals differs from adult MVM. The purpose of this study is to document whether thyroid hormone can induce closure in vivo in the rat and to relate this effect of thyroxine to the structural and functional maturation of the intestinal MVM. To assess closure, 2-wk-old rats were fed in rat immunoglobulin G (IgG), and serum antibody binding activity was measured 4 h later. The antibody binding activitymore » of treated animals (T) was 1.5-2 times less than that of controls (C), indicating that thyroxine stimulates closure. The MVM similarly showed signs of maturation. Structural maturation was demonstrated by the lower fluidity of the thyroid-treated animals' membranes. Under the influence of thyroxine, the number of receptors on the MVM for IgG had decreased, while the K/sub a/ remained the same, demonstrating the functional maturation of the MVM. In conclusion, thryoid hormone can induce both structural and functional maturation of the intestinal MVM and can enhance the intestinal mucosal barrier by decreasing the penetration of antibodies.« less
Communicating Performance Assessments Results - 13609
DOE Office of Scientific and Technical Information (OSTI.GOV)
Layton, Mark
2013-07-01
The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to bemore » used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burmeister, Mark
2016-11-01
The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mathews, S.
This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-09-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less
Emery, James; Crump, Carolyn; Hawkins, Margaret
2007-10-01
AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.
48 CFR 3004.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...
48 CFR 3004.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...
48 CFR 3004.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL ADMINISTRATIVE MATTERS Government... closure, the contracting officer shall obtain the listed DHS and Department of Defense (DOD) forms from...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, thismore » addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 04-26-03, Lead Bricks. This UR was established as part of FFACO corrective actions and was based on the presence of lead contamination at concentrations greater than the action level established at the time of the initial investigation.« less
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the URmore » Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.« less
Corring, Deborah J; Whittall, Sandy; MustinPowell, Jill; Jarmain, Sarah; Chapman, Patty; Sussman, Sam
2016-01-01
St. Joseph's Health Care London (hereafter referred to as St. Joseph's) is a publicly funded hospital that has led mental health (MH) service system transformation in south west Ontario following directives from the Health Services Restructuring Commission (HSRC) (Sinclair 2000). This paper documents how provincial policy; HSRC directives; use of change management activities; organizational planning; and partnerships with other hospitals, community agencies and LHINs drove, shaped and accomplished the transformational change. The transformation included divestment of beds and related ambulatory services to four other hospitals, closure of beds and employment services and the construction of two state-of-the-art facilities. This paper documents the tracking of system performance measures and the outcomes that resulted.
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
Device-less patent foramen ovale closure by radiofrequency thermal energy.
Walpoth, Nazan B; Habermacher, Kathrin; Moarof, Igal; Watson, Sandy; Wahl, Andreas; Windecker, Stephan; Schönenberger, Christa; Meier, Bernhard
2008-02-23
The goal of this study was to assess the feasibility, safety and success of a system which uses radiofrequency energy (RFE) rather than a device for percutaneous closure of patent foramen ovale (PFO). Sixteen patients (10 men, 6 women, mean age 50 years) were included in the study. All of them had a proven PFO with documented right-to-left shunt (RLS) after Valsalva manoeuvre (VM) during transoesophageal echocardiography (TEE). The patients had an average PFO diameter of 6 +/- 2 mm at TEE and an average of 23 +/- 4 microembolic signals (MES) in power M-mode transcranial Doppler sonography (pm-TCD), measured over the middle cerebral artery. An atrial septal aneurysm (ASA) was present in 7 patients (44%). Balloon measurement, performed in all patients, revealed a stretched PFO diameter of 8 +/- 3 mm. In 2 patients (stretched diameter 11 and 14 mm respectively, both with ASA >10 mm), radiofrequency was not applied (PFO too large) and the PFO was closed with an Amplatzer PFO occluder instead. A 6-month follow-up TEE was performed in all patients. There were no serious adverse events during the procedure or at follow-up (12 months average). TEE 6 months after the first RFE procedure showed complete closure of the PFO in 50% of the patients (7/14). Closure appeared to be influenced by PFO diameter, complete closure being achieved in 89% (7/8) with a balloon-stretched diameter < or =7 mm but in none of the patients >7 mm. Only one of the complete closure patients had an ASA. Of the remainder, 4 (29%) had an ASA. Although the PFO was not completely closed in this group, some reduction in the diameter of the PFO and in MES was documented by TEE and pm-TCD with VM. Five of the 7 residual shunt patients received an Amplatzer PFO occluder. Except for one patient with a minimal residual shunt, all showed complete closure of PFO at 6-month follow-up TEE and pm-TCD with VM. The other two refused a closure device. The results confirm that radiofrequency closure of the PFO is safe albeit less efficacious and more complex than device closure. The technique in its current state should not be attempted in patients with a balloon-stretched PFO diameter >7 mm and an ASA.
Closures and Curtailments For Offsets
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
DOE Office of Scientific and Technical Information (OSTI.GOV)
HOPKINS, A.M.
2005-02-23
The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less
A comparison of techniques for myelomeningocele defect closure in the neonatal period.
Kobraei, Edward M; Ricci, Joseph A; Vasconez, Henry C; Rinker, Brian D
2014-09-01
Numerous techniques have been described for repair of myelomeningoceles, but outcome data is scarce. A retrospective review was performed in 32 consecutive patients who underwent neonatal myelomeningocele repair and extra-dural closure to determine the influence of repair type on outcome. All procedures for myelomeningocele closure were classified into one of three groups, which included primary closure, myocutaneous flaps, and fasciocutaneous flaps. Defect size ranged from 1 to 48 cm(2). Primary skin closure was performed in 3 patients, fasciocutaneous flaps in 13 patients, and myocutaneous flaps in 16 patients. The overall complication rate was 18%. No difference in the complication rates among the primary closure, myocutaneous, and fasciocutaneous flap groups was observed in our analysis. While not statistically significant, our data documents an association of fasciocutaneous flaps with postoperative complications that were not evident with primary skin closure or myocutaneous flaps (odds ratio 3.8; p = 0.15). The occurrence of one or more complications was associated with a longer hospital stay. Myocutaneous flaps provide a secure repair and should be considered for smaller myelomeningocele defects in addition to the larger defects where they are more traditionally used. We propose a tissue-based classification of closure techniques strictly for multi-institution outcome comparison that may ultimately inform clinical decision-making.
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
Negi, Sanjana; Tak, Himanshu; Ganapathi, T R
2018-03-01
MusaSNAC1 function in H 2 O 2 mediated stomatal closure and promote drought tolerance by directly binding to CGT[A/G] motif in regulatory region of multiple stress-related genes. Drought is a abiotic stress-condition, causing reduced plant growth and diminished crop yield. Guard cells of the stomata control photosynthesis and transpiration by regulating CO 2 exchange and water loss, thus affecting growth and crop yield. Roles of NAC (NAM, ATAF1/2 and CUC2) protein in regulation of stress-conditions has been well documented however, their control over stomatal aperture is largely unknown. In this study we report a banana NAC protein, MusaSNAC1 which induced stomatal closure by elevating H 2 O 2 content in guard cells during drought stress. Overexpression of MusaSNAC1 in banana resulted in higher number of stomata closure causing reduced water loss and thus elevated drought-tolerance. During drought, expression of GUS (β-glucuronidase) under P MusaSNAC1 was remarkably elevated in guard cells of stomata which correlated with its function as a transcription factor regulating stomatal aperture closing. MusaSNAC1 is a transcriptional activator belonging to SNAC subgroup and its 5'-upstream region contain multiple Dof1 elements as well as stress-associated cis-elements. Moreover, MusaSNAC1 also regulate multiple stress-related genes by binding to core site of NAC-proteins CGT[A/G] in their 5'-upstream region. Results indicated an interesting mechanism of drought tolerance through stomatal closure by H 2 O 2 generation in guard cells, regulated by a NAC-protein in banana.
Spontaneous Closure of Patent Ductus Arteriosus in Infants ≤1500 g.
Semberova, Jana; Sirc, Jan; Miletin, Jan; Kucera, Jachym; Berka, Ivan; Sebkova, Sylva; O'Sullivan, Sinead; Franklin, Orla; Stranak, Zbynek
2017-08-01
Patent ductus arteriosus (PDA) remains a challenging issue in very low birth weight (VLBW) infants, and its management varies widely. Our aim in this study was to document the natural course of ductus arteriosus in a cohort of VLBW infants who underwent conservative PDA management with no medical or surgical intervention. A retrospective cohort study conducted in 2 European level-3 neonatal units. A total of 368 VLBW infants were born within the study period. Two hundred and ninety-seven infants were free of congenital malformations or heart defects and survived to hospital discharge. Out of those, 280 infants received truly conservative PDA management. In 237 (85%) of nontreated infants, the PDA closed before hospital discharge. The Kaplan-Meier model was used to document the incidence proportion of PDA closure over time for different gestational age groups. The median time to ductal closure was 71, 13, 8, and 6 days in <26+0, 26+0 to 27+6, 28+0 to 29+6, and ≥30 weeks, respectively. For different birth weight groups, the median was 48, 22, 9, and 8 days in infants weighing <750, 750 to 999, 1000 to 1249, and 1250 to 1500 g, respectively. No statistically significant relationship was found between PDA closure before hospital discharge and neonatal morbidities. The likelihood of PDA spontaneous closure in VLBW infants is extremely high. We provide in our findings a platform for future placebo-controlled trials focused on the smallest and youngest infants. Copyright © 2017 by the American Academy of Pediatrics.
Magnetic resonance imaging study of eye congenital birth defects in mouse model
Tucker, Zachary; Mongan, Maureen; Meng, Qinghang; Xia, Ying
2017-01-01
Purpose Embryonic eyelid closure is a well-documented morphogenetic episode in mammalian eye development. Detection of eyelid closure defect in humans is a major challenge because eyelid closure and reopen occur entirely in utero. As a consequence, congenital eye defects that are associated with failure of embryonic eyelid closure remain unknown. To fill the gap, we developed a mouse model of defective eyelid closure. This preliminary work demonstrates that the magnetic resonance imaging (MRI) approach can be used for the detection of extraocular muscle abnormalities in the mouse model. Methods Mice with either normal (Map3k1+/−) or defective (Map3k1−/−) embryonic eyelid closure were used in this study. Images of the extraocular muscles were obtained with a 9.4 T high resolution microimaging MRI system. The extraocular muscles were identified, segmented, and measured in each imaging slice using an in-house program. Results In agreement with histological findings, the imaging data show that mice with defective embryonic eyelid closure develop less extraocular muscle than normal mice. In addition, the size of the eyeballs was noticeably reduced in mice with defective embryonic eyelid closure. Conclusions We demonstrated that MRI can potentially be used for the study of extraocular muscle in the mouse model of the eye open-at-birth defect, despite the lack of specificity of muscle group provided by the current imaging resolution. PMID:28848319
Lease Operations Environmental Guidance Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bureau of Land Management
This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.
Failure of mesenteric defect closure after Roux-en-Y gastric bypass.
Hope, William W; Sing, Ronald F; Chen, Albert Y; Lincourt, Amy E; Gersin, Keith S; Kuwada, Timothy S; Heniford, B Todd
2010-01-01
Bowel obstructions following Roux-en-Y gastric bypass (RYGB) are a significant issue often caused by internal herniation. Controversy continues as to whether mesenteric defect closure is necessary to decrease the incidence of internal hernias after RYGB. Our purpose was to evaluate the effectiveness of closing the mesenteric defect at the jejunojejunostomy in patients who underwent RYGB by examining this potential space at reoperation for any reason. We retrospectively reviewed medical records of patients undergoing surgery after RYGB from August 1999 to October 2008 to determine the status of the mesentery at the jejunojejunostomy. Eighteen patients underwent surgery 2 to 19 months after open (n=8) or laparoscopic (n=10) RYGB. All patients had documented suture closure of their jejunojejunostomy at the time of RYGB. Permanent (n=12) or absorbable (n=6) sutures were used for closures. Patients lost 23.6 kg to 62.1 kg before a reoperation was required for a ventral hernia (n=8), cholecystectomy (n=4), abdominal pain (n=4), or small bowel obstruction (n=2). Fifteen of the 18 patients had open mesenteric defects at the jejunojejunostomy despite previous closure; none were the cause for reoperation. Routine suture closure of mesenteric defects after RYGB may not be an effective permanent closure likely due to the extensive fat loss and weight loss within the mesentery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cabble, Kevin J.; Boehlecke, Robert F.
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less
40 CFR 265.143 - Financial assurance for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., except as provided in § 265.143(f), divided by the number of years in the pay-in period. (ii) Subsequent... bills for partial or final closure activities, the Regional Administrator will instruct the trustee to... facility over its remaining operating life. Within 60 days after receiving bills for closure activities...
40 CFR 264.143 - Financial assurance for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... in § 264.143(g), divided by the number of years in the pay-in period. Subsequent payments must be... for partial or final closure activities, the Regional Administrator will instruct the trustee to make... operating life. Within 60 days after receiving bills for closure activities, the Regional Administrator will...
2009 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. T. Lindsey; K. A. Gano; R. D. Teel
2009-09-30
This document details the results of revegetation and mitigation monitoring conducted in 2009, including 25 revegetation/restoration projects, one revegetation/mitigation project, and three bat mitigation projects.
PROTOCOL FOR EXAMINATION OF THE INNER CAN CLOSURE WELD REGION FOR 3013 DE CONTAINERS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mickalonis, J.
2014-09-16
The protocol for the examination of the inner can closure weld region (ICCWR) for 3013 DE containers is presented within this report. The protocol includes sectioning of the inner can lid section, documenting the surface condition, measuring corrosion parameters, and storing of samples. This protocol may change as the investigation develops since findings may necessitate additional steps be taken. Details of the previous analyses, which formed the basis for this protocol, are also presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with themore » UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.« less
10 CFR 60.61 - Provision of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...
Angle closure glaucoma in congenital ectropion uvea.
Wang, Grace M; Thuente, Daniel; Bohnsack, Brenda L
2018-06-01
Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months) and required additional surgery (cycloablation or trabeculectomy). Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control.
Effective school actions for mitigating seasonal influenza outbreaks in Niigata, Japan.
Sugisaki, Koshu; Seki, Nao; Tanabe, Naohito; Saito, Reiko; Sasaki, Asami; Sasaki, Satoshi; Suzuki, Hiroshi
2013-01-01
Japan has implemented various school actions during seasonal influenza outbreaks since the 1950's under the School Health Law. However, the effective duration, extent, and timing of closures remain unresolved. We conducted a retrospective study on the relationship between elementary class closures and influenza outbreak control during four consecutive influenza seasons from the 2004-2005 to 2007-2008 school years in Joetsu, Niigata, Japan. Among a total of 1,061 classes of 72 schools, 624 cases of influenza outbreaks were documented among 61 schools. Class closures were carried out in a total of 62 cases in response to influenza outbreak, which was defined as a student absentee rate of greater than 10% due to influenza or influenza-like illness. Of these cases, two-day class closures were conducted the day after reaching a 10% student absentee rate in 28 cases and other types of closures were initiated in 34 cases. A markedly higher number of outbreak cases ended within one week for two-day class closures compared to the other types of closures (82.1% vs. 20.6%, respectively). The significant association between two-day class closures and interruption of an outbreak within one week was confirmed using a multivariable model adjusted for the season, grade, day of the week of an outbreak start, and absentee rate on the day of an outbreak start (OR, 3.18; 95% CI, 1.12-9.07; p = 0.030). Our results suggest that a two-day class closure carried out the day after reaching a 10% absentee rate is an effective approach for mitigating influenza outbreaks in elementary schools.
Diener, Markus K; Seiler, Christoph M; Rossion, Inga; Kleeff, Jörg; Glanemann, Matthias; Butturini, Giovanni; Tomazic, Ales; Bruns, Christiane J; Busch, Olivier R C; Farkas, Stefan; Belyaev, Orlin; Neoptolemos, John P; Halloran, Christopher; Keck, Tobias; Niedergethmann, Marco; Gellert, Klaus; Witzigmann, Helmut; Kollmar, Otto; Langer, Peter; Steger, Ulrich; Neudecker, Jens; Berrevoet, Frederik; Ganzera, Silke; Heiss, Markus M; Luntz, Steffen P; Bruckner, Thomas; Kieser, Meinhard; Büchler, Markus W
2011-04-30
The ideal closure technique of the pancreas after distal pancreatectomy is unknown. We postulated that standardised closure with a stapler device would prevent pancreatic fistula more effectively than would a hand-sewn closure of the remnant. This multicentre, randomised, controlled, parallel group-sequential superiority trial was done in 21 European hospitals. Patients with diseases of the pancreatic body and tail undergoing distal pancreatectomy were eligible and were randomly assigned by central randomisation before operation to either stapler or hand-sewn closure of the pancreatic remnant. Surgical performance was assessed with intraoperative photo documentation. The primary endpoint was the combination of pancreatic fistula and death until postoperative day 7. Patients and outcome assessors were masked to group assignment. Interim and final analysis were by intention to treat in all patients in whom a left resection was done. This trial is registered, ISRCTN18452029. Between Nov 16, 2006, and July 3, 2009, 450 patients were randomly assigned to treatment groups (221 stapler; 229 hand-sewn closure), of whom 352 patients (177 stapler, 175 hand-sewn closure) were analysed. Pancreatic fistula rate or mortality did not differ between stapler (56 [32%] of 177) and hand-sewn closure (49 [28%] of 175; OR 0·84, 95% CI 0·53–1·33; p=0·56). One patient died within the fi rst 7 days after surgery in the hand-sewn group; no deaths occurred in the stapler group. Serious adverse events did not differ between groups. Stapler closure did not reduce the rate of pancreatic fistula compared with hand-sewn closure for distal pancreatectomy. New strategies, including innovative surgical techniques, need to be identified to reduce this adverse outcome. German Federal Ministry of Education and Research.
40 CFR 264.197 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...
Anterior Segment Imaging for Angle Closure.
Chansangpetch, Sunee; Rojanapongpun, Prin; Lin, Shan C
2018-04-01
To summarize the role of anterior segment imaging (AS-imaging) in angle closure diagnosis and management, and the possible advantages over the current standard of gonioscopy. Literature review and perspective. Review of the pertinent publications with interpretation and perspective in relation to the use of AS-imaging in angle closure assessment focusing on anterior segment optical coherence tomography and ultrasound biomicroscopy. Several limitations have been encountered with the reference standard of gonioscopy for angle assessment. AS-imaging has been shown to have performance in angle closure detection compared to gonioscopy. Also, imaging has greater reproducibility and serves as better documentation for long-term follow-up than conventional gonioscopy. The qualitative and quantitative information obtained from AS-imaging enables better understanding of the underlying mechanisms of angle closure and provides useful parameters for risk assessment and possible prediction of the response to laser and surgical intervention. The latest technologies-including 3-dimensional imaging-have allowed for the assessment of the angle that simulates the gonioscopic view. These advantages suggest that AS-imaging has a potential to be a reference standard for the diagnosis and monitoring of angle closure disease in the future. Although gonioscopy remains the primary method of angle assessment, AS-imaging has an increasing role in angle closure screening and management. The test should be integrated into clinical practice as an adjunctive tool for angle assessment. It is arguable that AS-imaging should be considered first-line screening for patients at risk for angle closure. Copyright © 2018 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Horton, Forest Woody, Ed.; Kadec, Sarah T., Ed.
This document reports on an NCLIS (National Commission on Libraries and Information Science) study of the proposal to close NTIS (National Technical Information Service) and shift its paper, microfiche, digital archives, and bibliographic database to the Library of Congress. The report documents the results of research, interviews, public…
Final state of the Strategic Petroleum Reserve (SPR) Weeks Island Mine
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOLECKE,MARTIN A.
2000-02-01
This report documents the decommissioning and abandonment activities at the Weeks Island Strategic Petroleum Reserve (SPR) site, Iberia Parish, Louisiana, that were concluded in 1999. These activities required about six years of intense operational, engineering, geotechnical, and management support efforts, following initiation of site abandonment plans in 1994. The Weeks Island SPR mine stored about 72.5 million bbl of crude oil following oil fill in 1980--1982, until November 1995, when the DOE initiated oil drawdown procedures, with brine refill and oil skimming, and numerous plugging and sealing activities. About 98% of the crude oil was recovered and transferred to othermore » SPR facilities in Louisiana and Texas; a small amount was also sold. This document summarizes recent pre- and post-closure: conditions of surface features at the site, including the sinkholes, the freeze wall, surface subsidence measurements and predictions; conditions within the SPR mine, including oil recovery, brine filling, and the Markel Wet Drift; risk assessment evaluations relevant to the decommissioning and long-term potential environmental impacts; continuing environmental monitoring activities at the site; and, an overview on the background and history of the Weeks Island SPR facility.« less
AN EVALUATION OF HANFORD SITE TANK FARM SUBSURFACE CONTAMINATION FY2007
DOE Office of Scientific and Technical Information (OSTI.GOV)
MANN, F.M.
2007-07-10
The Tank Farm Vadose Zone (TFVZ) Project conducts activities to characterize and analyze the long-term environmental and human health impacts from tank waste releases to the vadose zone. The project also implements interim measures to mitigate impacts, and plans the remediation of waste releases from tank farms and associated facilities. The scope of this document is to report data needs that are important to estimating long-term human health and environmental risks. The scope does not include technologies needed to remediate contaminated soils and facilities, technologies needed to close tank farms, or management and regulatory decisions that will impact remediation andmore » closure. This document is an update of ''A Summary and Evaluation of Hanford Site Tank Farm Subsurface Contamination''. That 1998 document summarized knowledge of subsurface contamination beneath the tank farms at the time. It included a preliminary conceptual model for migration of tank wastes through the vadose zone and an assessment of data and analysis gaps needed to update the conceptual model. This document provides a status of the data and analysis gaps previously defined and discussion of the gaps and needs that currently exist to support the stated mission of the TFVZ Project. The first data-gaps document provided the basis for TFVZ Project activities over the previous eight years. Fourteen of the nineteen knowledge gaps identified in the previous document have been investigated to the point that the project defines the current status as acceptable. In the process of filling these gaps, significant accomplishments were made in field work and characterization, laboratory investigations, modeling, and implementation of interim measures. The current data gaps are organized in groups that reflect Components of the tank farm vadose zone conceptual model: inventory, release, recharge, geohydrology, geochemistry, and modeling. The inventory and release components address residual wastes that will remain in the tanks and tank-farm infrastructure after closure and potential losses from leaks during waste retrieval. Recharge addresses the impacts of current conditions in the tank farms (i.e. gravel covers that affect infiltration and recharge) as well as the impacts of surface barriers. The geohydrology and geochemistry components address the extent of the existing subsurface contaminant inventory and drivers and pathways for contaminants to be transported through the vadose zone and groundwater. Geochemistry addresses the mobility of key reactive contaminants such as uranium. Modeling addresses conceptual models and how they are simulated in computers. The data gaps will be used to provide input to planning (including the upcoming C Farm Data Quality Objective meetings scheduled this year).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick and Sloop, Christy
2011-04-01
This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ketusky, Edward; Blanton, Paul; Bobbitt, John H.
The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactivemore » material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.« less
Schurter, David; Braun, Julia; Jenni, Rolf; Van Der Loo, Bernd
2012-02-01
Percutaneous closure of a patent foramen ovale (PFO) is a technically simple and safe procedure. PFO is a common finding present in up to one third of the population. Although several conditions such as stroke, migraine, and sleep apnoea have been associated with a PFO, as underlined by observational studies, no causal relationship has been documented so far. As this setting may potentially leave more space for the involved physicians for the choice of treatment, we hypothesized that social characteristics of the patient with a PFO might play a role. We retrospectively analysed the data of 153 patients with a cerebrovascular and/or peripheral ischaemic event with the diagnosis of a PFO as documented in echocardiography from 2000 until 2005 at the University Hospital in Zurich, Switzerland. Forty-four patients (= 23%) underwent catheter-based PFO closure. There was no significant difference with respect to age (<40 years: P = 0.094, ns; 40-59 years: P = 0.923, ns; > or =60 years: P= 0.234, ns), gender (P = 0.356, ns) and insurance status (<40 years: P= 0.15, ns; 40-59 years: P= 0.37, ns; 60 years: P = 0.26, ns) between those who underwent percutaneous PFO closure and those who did not. We conclude from this single-centre experience that social characteristics of patients only have a marginal impact on the indication of percutaneous closure of a PFO, if at all.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
..., and other supporting documentation may be obtained from Rich Malinowski, NMFS, Southeast Regional... CONTACT: Rich Malinowski, telephone: 727-824- 5305, email Rich.Malinowski@noaa.gov . SUPPLEMENTARY...
Improving the Safety of Moving Lane Closures
DOT National Transportation Integrated Search
2009-06-01
Moving lane closures are an increasingly utilized and inherently hazardous traffic control procedure for highway : maintenance and operations activities. To improve the safety of moving lane closures for workers and motorists, : this research studied...
Full closure strategic analysis.
DOT National Transportation Integrated Search
2014-07-01
The full closure strategic analysis was conducted to create a decision process whereby full roadway : closures for construction and maintenance activities can be evaluated and approved or denied by CDOT : Traffic personnel. The study reviewed current...
Suitability of Exoseal Vascular Closure Device for Antegrade Femoral Artery Puncture Site Closure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmelter, Christopher, E-mail: christopher.schmelter@klinikum-ingolstadt.de; Liebl, Andrea; Poullos, Nektarios
Purpose. To assess the efficacy and safety of the Exoseal vascular closure device for antegrade puncture of the femoral artery. Methods. In a prospective study from February 2011 to January 2012, a total of 93 consecutive patients received a total of 100 interventional procedures via an antegrade puncture of the femoral artery. An Exoseal vascular closure device (6F) was used for closure in all cases. Puncture technique, duration of manual compression, and use of compression bandages were documented. All patients were monitored by vascular ultrasound and color-coded duplex sonography of their respective femoral artery puncture site within 12 to 36more » h after angiography to check for vascular complications. Results. In 100 antegrade interventional procedures, the Exoseal vascular closure device was applied successfully for closure of the femoral artery puncture site in 96 cases (96 of 100, 96.0 %). The vascular closure device could not be deployed in one case as a result of kinking of the vascular sheath introducer and in three cases because the bioabsorbable plug was not properly delivered to the extravascular space adjacent to the arterial puncture site, but instead fully removed with the delivery system (4.0 %). Twelve to 36 h after the procedure, vascular ultrasound revealed no complications at the femoral artery puncture site in 93 cases (93.0 %). Minor vascular complications were found in seven cases (7.0 %), with four cases (4.0 %) of pseudoaneurysm and three cases (3.0 %) of significant late bleeding, none of which required surgery. Conclusion. The Exoseal vascular closure device was safely used for antegrade puncture of the femoral artery, with a high rate of procedural success (96.0 %), a low rate of minor vascular complications (7.0 %), and no major adverse events.« less
75 FR 5375 - Hazardous Material; Miscellaneous Packaging Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-02
...In this final rule, PHMSA is amending packaging requirements in the Hazardous Materials Regulations to enhance compliance flexibility, improve clarity, and reduce regulatory burdens. Specifically, we are revising several packaging related definitions; adding provisions to allow more flexibility when preparing and transmitting closure instructions, including conditions under which closure instructions may be transmitted electronically; adding a requirement for shippers to retain packaging closure instructions; incorporating new language that will allow for a practicable means of stenciling the ``UN'' symbol on packagings; and clarifying a requirement to document the methodology used when determining whether a change in packaging configuration requires retesting as a new design or may be considered a variation of a previously tested design. This final rule also incorporates requirements for construction, maintenance, and use of Large Packagings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
Planning the Transition to Long-Term Stewardship for the River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cearlock, C.S.; Lerch, J.A.; Sands, J.P.
2007-07-01
Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less
Spencer, Barbara T; Qureshi, Yasir; Sommer, Robert J
2014-10-01
The association of patient foramen ovale (PFO) and migraine headache (migraine) with aura (MA) is well established. Current research suggests a mechanistic link between platelet activation, paradoxical embolization and migraine in some patients. Clopidogrel, a platelet inhibitor, was added to existing migraine therapy, as a 4-week open-label trial in 15 women, aged 16-56 years, with severe migraine and documented right to left shunt (RLS). 13/15 had > 50% reduction or complete elimination of migraine symptoms. After completing the trial period, five responders remain on clopidogrel with ongoing benefit at 11.9 ± 4.5 months (6.5-20), one stopped clopidogrel because of side effects. Nine other responders underwent PFO closure and clopidogrel discontinuation. Eight of nine have had ongoing benefit. Clopidogrel may have a primary prophylactic role in migraine/RLS patients, but may also help select candidates who would benefit from PFO closure. A randomized clinical trial is being established. © International Headache Society 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.
Vaginal delivery after Misgav-Ladach cesarean section--is the risk of uterine rupture acceptable?
Hudić, Igor; Fatusić, Zlatan; Kamerić, Lejla; Misić, Mladen; Serak, Indira; Latifagić, Anela
2010-10-01
To evaluate whether the single-layer closure as is a routine by the Misgav-Ladach method compared to the double-layer closure as used by the Dörfler cesarean method is associated with an increased risk of uterine rupture in the subsequent pregnancy and delivery. The analysis is retrospective and is based on medical documentation of the Clinic for Gynecology and Obstetrics, University Clinical Centre, Tuzla, Bosnia and Herzegovina. All patients with one previous cesarean section who attempted vaginal birth following cesarean section were managed from 1 January 2002 to 31 December 2008. Exclusion criteria included multiple gestation, greater than one previous cesarean section, previous incision other than low transverse, gestational age at delivery less than 37 weeks and induction of delivery. We identified 448 patients who met inclusion criteria. We found that 303 patients had a single-layer closure (Misgav-Ladach) and 145 had a double-layer closure (Dörffler) of the previous uterine incision. There were 35 cases of uterine rupture. Of those patients with previous single-layer closure, 5.28% (16/303) had a uterine rupture compared to 13.11% (19/145) in the double-layer closure group (p<0.05). We have not found that a Misgav-Ladach cesarean section method (single-layer uterine closure) might be more likely to result in uterine rupture in women who attempted a vaginal birth after a previous cesarean delivery. This cesarean section method should find its confirmation in everyday clinical practice.
40 CFR 265.142 - Cost estimate for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...
40 CFR 265.142 - Cost estimate for closure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... must equal the cost of final closure at the point in the facility's active life when the extent and... at all times over the life of the facility. (3) The closure cost estimate may not incorporate any... facility at the time of partial or final closure. (4) The owner or operator may not incorporate a zero cost...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Alvarado, Juan
This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Strand
2006-05-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. A Tier 2 evaluation was conducted, and a FAL of 185,000 micrograms per kilogram was calculated for chlordane at CASs 16-04-01, 16-04-02, and 16-04-03 based on an occasional use area exposure scenario. This evaluation of chlordane based on the Tier 2 FAL determined that no FALs were exceeded. Therefore, the DQO data needs were met, and it was determined that no corrective action (based on risk to human receptors) is necessary for the site. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) The surface soil surrounding the main concrete pad at CAS 23-20-01 contained Aroclor-1254, Aroclor-1260, and chlordane above the FALs. This soil, along with the COCs, was subsequently removed at CAS 23-20-01. (2) The sludge in the concrete box of the catch basin at the large concrete pad at CAS 23-20-01 contained lead and benzo(a)pyrene above the FALs. This contamination was limited to the sludge in the concrete box of the catch basin and did not migrate to the subsurface features beneath it. The contaminated and the concrete box of the catch basin were subsequently recovered at CAS 23-20-01.« less
Co-activated yet disconnected-Neural correlates of eye closures when trying to stay awake.
Ong, Ju Lynn; Kong, Danyang; Chia, Tiffany T Y; Tandi, Jesisca; Thomas Yeo, B T; Chee, Michael W L
2015-09-01
Spontaneous eye-closures that herald sleep onset become more frequent when we are sleep deprived. Although these are typically associated with decreased responsiveness to external stimuli, it is less clear what occurs in the brain at these transitions to drowsiness and light sleep. To investigate this, task-free fMRI of sleep-deprived participants was acquired. BOLD activity associated with periods of spontaneously occurring eye closures were marked and analyzed. We observed concurrent and extensive hypnagogic co-activation of the extrastriate visual, auditory, and somatosensory cortices as well as the default mode network, consistent with internal sensory activity without external stimulation. Co-activation of fronto-parietal areas known to mediate attentional control could correspond with participants resisting sleep or additional engagement of mental imagery. This constellation of signal changes differed from those elicited by cued eye closures of similar duration and distribution in the same, rested participants. They also differ from signal changes associated with mind-wandering and consolidated light sleep. Concurrent with the observed event-related changes, eye closures elicited additional reduction in functional connectivity within nodes of the DMN and DAN, superposed on already reduced connectivity associated with sleep deprivation. There was concurrent deactivation of the thalamus during eye-closure during the sleep-deprived state but almost similar changes occurred in the well-rested state that may also be relevant. These findings highlight the dynamic shifts in brain activity and connectivity at border between wakefulness and sleep. Copyright © 2015. Published by Elsevier Inc.
Tertiary stress field evolution in Sistan (Eastern Iran)
NASA Astrophysics Data System (ADS)
Michael, Jentzer; Marc, Fournier; Philippe, Agard; Jafar, Omrani
2016-04-01
The Sistan orogenic belt in eastern Iran, near the boundary with Afghanistan, results from the closure of a branch of the Neo-Thethys: the Sistan Ocean. It was divided by Tirrul et al. (1983) in five main units: the Lut (1) and Afghan (2) continental blocks where basement is exposed; the Neh (3) and Ratuk (4) complexes which display ophiolitic rocks weakly and highly (HP-BT) metamorphosed, respectively, and the Sefidabeh basin lying over these complexes and interpreted as a fore-arc basin. Sistan is bordered by the Makran and Zagros (formed by the closure of the Neo-Tethys) to the south and by the Kopet Dagh (formed by the closure of Paleo-Tethys) to the North. The aim of this study is to fill the gap between preliminary studies about the overall structure of the Sistan Suture Zone and recent investigations of active tectonics in the region (e.g., Walker et al., 2004 and 2006 a and b). Questions herein addressed are: (1) how are stresses transfered throughout Iran from the Zagros to the Sistan belts? (2) Did the Zagros, Makran and Sistan belts evolve independently through time, or were they mechanically coupled? In order to answer these questions, we have determined paleostress evolution in the Sistan, using a direct inversion method for 42 microtectonic sites in almost all lithologies of the Neh complex and the Sefidabeh basin. We find three successive directions of compression: (1) 87°N for the oldest deformation stage dated of the Late Miocene, (2) 59°N for the intermediate stage probably dated of the Early Pliocene, and (3) 26°N for the youngest stage dated of the Plio-Quaternary. A counterclockwise rotation of about 60° of the main stress (σ1) in less than 10 Ma is therefore documented in Sistan. These same three stages of deformation were also documented by several microtectonic studies in Iran, especially in Makran and Zagros. The direction of the youngest compression is very homogeneous indicating that the mountain belts and continental blocks of Iran are presently mechanically coupled and shortened in the Arabia Eurasia collision zone. The counterclockwise rotation of compression, from Miocene to Present, documented everywhere in Iran is probably related to the rotation of the Arabia-Eurasia direction of convergence. However, the amount of rotation is higher in Central Iran than in South Iran, suggesting a progressive mechanical coupling from Miocene to Present. Tirrul, R., Bell, I.R., Griffis, R.J., Camp, V.E., 1983. The Sistan suture zone of eastern Iran. Geol. Soc. America Bull., 94, 134-150. Walker, R., Jackson, J., 2004. Active tectonics and late Cenozoic strain distribution in central and eastern Iran. Tectonics 23, doi:10.1029/2003TC001529 Walker, R.T., 2006 a. A remote sensing study of active folding and faulting in southern Kerman province, S.E. Iran. J. Struct. Geol. 28, 654-668. doi:10.1016/j.jsg.2005.12.014 Walker, R.T., Khatib, M.M., 2006 b. Active faulting in the Birjand region of NE Iran. Tectonics 25, doi:10.1029/2005TC001871
Connection details for prefabricated bridge elements and systems.
DOT National Transportation Integrated Search
2009-03-30
Prefabricated components of a bridge produced off-site can be assembled quickly, and can reduce design time and cost, minimizing forming, minimize lane closure time and/or possibly eliminate the need for a temporary bridge. This document has been dev...
Closure device for lead-acid batteries
Ledjeff, Konstantin
1983-01-01
A closure device for lead-acid batteries includes a filter of granulated activated carbon treated to be hydrophobic combined with means for preventing explosion of emitted hydrogen and oxygen gas. The explosion prevention means includes a vertical open-end tube within the closure housing for maintaining a liquid level above side wall openings in an adjacent closed end tube. Gases vent from the battery through a nozzle directed inside the closed end tube against an impingement surface to remove acid droplets. The gases then flow through the side wall openings and the liquid level to quench any possible ignition prior to entering the activated carbon filter. A wick in the activated carbon filter conducts condensed liquid back to the closure housing to replenish the liquid level limited by the open-end tube.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LEHMAN LL
2008-01-23
Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures aremore » different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The purpose of this paper is to discuss implications of NUREG-1854 and to examine the feasibility and potential benefits of applying these provisions to waste determinations and supporting documents such as future performance assessments for tank residuals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, Alissa J.
2015-01-01
This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less
Achieving and documenting closure in plant growth facilities
NASA Technical Reports Server (NTRS)
Knott, W. M.; Sager, John C.; Wheeler, Ray
1992-01-01
As NASA proceeds with its effort to develop a Controlled Ecological Life Support System (CELSS) that will provide life support to crews during long duration space missions, it must address the question of facility and system closure. The concept of closure as it pertains to CELSS and engineering specifications, construction problems and monitoring procedures used in the development and operation of a closed plant growth facility for the CELSS program are described. A plant growth facility is one of several modules required for a CELSS. A prototype of this module at Kennedy Space Center is the large (7m tall x 3.5m diameter) Biomass Production Chamber (BPC), the central facility of the CELSS Breadboard Project. The BPC is atmospherically sealed to a leak rate of approximately 5 percent of its total volume per 24 hours. This paper will discuss the requirements for atmospheric closure in the facility, present CO2 and trace gas data from initial tests of the BPC with and without plants, and describe how the chamber was sealed atmospherically. Implications that research conducted in this type of facility will have for the CELSS program are discussed.
Libiaková, Michaela; Floková, Kristýna; Novák, Ondřej; Slováková, L'udmila; Pavlovič, Andrej
2014-01-01
The trap of the carnivorous plant Venus flytrap (Dionaea muscipula) catches prey by very rapid closure of its modified leaves. After the rapid closure secures the prey, repeated mechanical stimulation of trigger hairs by struggling prey and the generation of action potentials (APs) result in secretion of digestive fluid. Once the prey's movement stops, the secretion is maintained by chemical stimuli released from digested prey. We investigated the effect of mechanical and chemical stimulation (NH4Cl, KH2PO4, further N(Cl) and P(K) stimulation) on enzyme activities in digestive fluid. Activities of β-D-glucosidases and N-acetyl-β-D-glucosaminidases were not detected. Acid phosphatase activity was higher in N(Cl) stimulated traps while proteolytic activity was higher in both chemically induced traps in comparison to mechanical stimulation. This is in accordance with higher abundance of recently described enzyme cysteine endopeptidase dionain in digestive fluid of chemically induced traps. Mechanical stimulation induced high levels of cis-12-oxophytodienoic acid (cis-OPDA) but jasmonic acid (JA) and its isoleucine conjugate (JA-Ile) accumulated to higher level after chemical stimulation. The concentration of indole-3-acetic acid (IAA), salicylic acid (SA) and abscisic acid (ABA) did not change significantly. The external application of JA bypassed the mechanical and chemical stimulation and induced a high abundance of dionain and proteolytic activity in digestive fluid. These results document the role of jasmonates in regulation of proteolytic activity in response to different stimuli from captured prey. The double trigger mechanism in protein digestion is proposed. PMID:25153528
1983-06-30
activating a separate transmitter, audible alarm, or contact closure. This sensor is compatible with any device that utilizes an input pulse or...transmitter, audible alarm, or contact closure. This sensor is compatible *i with any device that utilizes an output to produce an alarm. 110-4769-002. This...used to generate an alarm by activating a separate transmitter, audible alarm, or contact closure. This sensor is compatible with any device that
Performance Assessment for Pump-and-Treat Closure or Transition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Johnson, Christian D.; Becker, Dave J.
2015-09-29
A structured performance assessment approach is useful to evaluate pump-and-treat (P&T) groundwater remediation, which has been applied at numerous sites. Consistent with the U.S. Environmental Protection Agency’s Groundwater Road Map, performance assessment during remedy implementation may be needed, and should consider remedy optimization, transition to alternative remedies, or remedy closure. In addition, a recent National Research Council study examined groundwater remediation at complex contaminated sites and concluded that it may be beneficial to evaluate remedy performance and the potential need for transition to alternative approaches at these sites. The intent of this document is to provide a structured approach formore » assessing P&T performance to support a decision to optimize, transition, or close a P&T remedy. The process presented in this document for gathering information and performing evaluations to support P&T remedy decisions includes use of decision elements to distinguish between potential outcomes of a remedy decision. Case studies are used to augment descriptions of decision elements and to illustrate each type of outcome identified in the performance assessment approach. The document provides references to resources for tools and other guidance relevant to conducting the P&T assessment.« less
Ischaemic stroke with patent foramen ovale.
Jusufovic, Mirza; Thomassen, Lars; Skjelland, Mona
2014-01-28
There is no sound scientific documentation of current guidelines for the treatment of cerebral infarction assumed to be due to patent foramen ovale. In this article, we present a young patient with this condition. In addition, we provide a general overview of the prevalence, recommended assessment and indications for treatment of patent foramen ovale in ischaemic stroke patients. The article is based on a non-systematic search in PubMed. We emphasise three recently published randomised trials on the subject. Transoesophageal echocardiography with saline contrast is the gold standard for detecting patent foramen ovale. Just who will benefit from the diagnosis and treatment of this condition remains unclear, however. None of the three randomised studies of antithrombotic treatment versus transcatheter closure in patients who have suffered ischaemic stroke show a difference in outcomes, but subgroup analyses indicate that closure in young patients (age <50 years) with a large foramen ovale reduces the number of recurrent ischaemic events. Two other randomised studies of antithrombotic treatment alone versus closure are presently ongoing. For stroke patients with patent foramen ovale, the choice between lifelong antithrombotic therapy alone and transcatheter closure is a difficult one. Treatment with antiplatelet agents remains the first choice in most cases. Well-designed studies are needed to identify which patients will benefit most from closure.
Closure of population biobanks and direct-to-consumer genetic testing companies.
Zawati, Ma'n H; Borry, Pascal; Howard, Heidi Carmen
2011-09-01
Genetic research gained new momentum with the completion of the Human Genome Project in 2003. Formerly centered on the investigation of single-gene disorders, genetic research is increasingly targeting common complex diseases and in doing so is studying the whole genome, the environment and its impact on genomic variation. Consequently, biobanking initiatives have emerged around the world as a tool to sustain such progress. Whether they are small scale or longitudinal, public or private, commercial or non-commercial, biobanks should consider the possibility of closure. Interestingly, while raising important ethical issues, this topic has hardly been explored in the literature. Indeed, ethical issues associated with sale, insolvency, end of funding, or transfer of materials to other entities (which are all issues either related to or possible consequences of closure) are seldom the subject of discussion. In an attempt to fill this gap, this paper will discuss-using population and direct-to-consumer (DTC) genetic testing companies' biobanks as case studies-(1) international and national normative documents addressing the issue of closure and (2) the internal policies of population biobanks and DTC genetic testing companies. The analysis will inform the debate on biobank closure and elucidate the underlying ethical issues, which include, but are not limited to informed consent, storage and privacy.
36 CFR 13.1328 - EGDA closures and restrictions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...
36 CFR 13.1328 - EGDA closures and restrictions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...
36 CFR 13.1328 - EGDA closures and restrictions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...
36 CFR 13.1328 - EGDA closures and restrictions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... otherwise restrict activities in the EGDA to protect public health, safety, or park resources, or to provide for the equitable and orderly use of park facilities. Information on closures and restrictions will be available at the park visitor information center. Violating closures or restrictions is prohibited. ...
50 CFR 600.511 - Fishery closure procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Fishery closure procedures. 600.511 Section 600.511 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Fishery closure procedures. (a) Activity Codes 1 and 2 for a fishery are automatically canceled in the...
Preparing Documents Recorder Terms District Info District Contact Info Find Your District RO District Map FAQs Closures/Notices Contact Us State of Alaska / Natural Resources / Recorder's Office Recording imply an endorsement of that organization, site, product, or service. Simplifile contact information
Knowing Where You're Going: Planning for Meaningful Course Closure
ERIC Educational Resources Information Center
Burgess-Van Aken, Barbara
2017-01-01
A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…
DOT National Transportation Integrated Search
2003-08-01
The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...
36 CFR 13.980 - Other FDA closures and restrictions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...
36 CFR 13.980 - Other FDA closures and restrictions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...
36 CFR 13.980 - Other FDA closures and restrictions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...
36 CFR 13.980 - Other FDA closures and restrictions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...
36 CFR 13.980 - Other FDA closures and restrictions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Other FDA closures and... Preserve Frontcountry Developed Area (fda) § 13.980 Other FDA closures and restrictions. The Superintendent may prohibit or otherwise restrict activities in the FDA to protect public health, safety, or park...
FGFR3 promotes synchondrosis closure and fusion of ossification centers through the MAPK pathway
Matsushita, Takehiko; Wilcox, William R.; Chan, Yuk Yu; Kawanami, Aya; Bükülmez, Hülya; Balmes, Gener; Krejci, Pavel; Mekikian, Pertchoui B.; Otani, Kazuyuki; Yamaura, Isakichi; Warman, Matthew L.; Givol, David; Murakami, Shunichi
2009-01-01
Activating mutations in FGFR3 cause achondroplasia and thanatophoric dysplasia, the most common human skeletal dysplasias. In these disorders, spinal canal and foramen magnum stenosis can cause serious neurologic complications. Here, we provide evidence that FGFR3 and MAPK signaling in chondrocytes promote synchondrosis closure and fusion of ossification centers. We observed premature synchondrosis closure in the spine and cranial base in human cases of homozygous achondroplasia and thanatophoric dysplasia as well as in mouse models of achondroplasia. In both species, premature synchondrosis closure was associated with increased bone formation. Chondrocyte-specific activation of Fgfr3 in mice induced premature synchondrosis closure and enhanced osteoblast differentiation around synchondroses. FGF signaling in chondrocytes increases Bmp ligand mRNA expression and decreases Bmp antagonist mRNA expression in a MAPK-dependent manner, suggesting a role for Bmp signaling in the increased bone formation. The enhanced bone formation would accelerate the fusion of ossification centers and limit the endochondral bone growth. Spinal canal and foramen magnum stenosis in heterozygous achondroplasia patients, therefore, may occur through premature synchondrosis closure. If this is the case, then any growth-promoting treatment for these complications of achondroplasia must precede the timing of the synchondrosis closure. PMID:18923003
Baetz, Ulrike; Huck, Nicola V.; Zhang, Jingbo
2017-01-01
Stomatal pores are formed between a pair of guard cells and allow plant uptake of CO2 and water evaporation. Their aperture depends on changes in osmolyte concentration of guard cell vacuoles, specifically of K+ and Mal2−. Efflux of Mal2− from the vacuole is required for stomatal closure; however, it is not clear how the anion is released. Here, we report the identification of ALMT4 (ALUMINUM ACTIVATED MALATE TRANSPORTER4) as an Arabidopsis thaliana ion channel that can mediate Mal2− release from the vacuole and is required for stomatal closure in response to abscisic acid (ABA). Knockout mutants showed impaired stomatal closure in response to the drought stress hormone ABA and increased whole-plant wilting in response to drought and ABA. Electrophysiological data show that ALMT4 can mediate Mal2− efflux and that the channel activity is dependent on a phosphorylatable C-terminal serine. Dephosphomimetic mutants of ALMT4 S382 showed increased channel activity and Mal2− efflux. Reconstituting the active channel in almt4 mutants impaired growth and stomatal opening. Phosphomimetic mutants were electrically inactive and phenocopied the almt4 mutants. Surprisingly, S382 can be phosphorylated by mitogen-activated protein kinases in vitro. In brief, ALMT4 likely mediates Mal2− efflux during ABA-induced stomatal closure and its activity depends on phosphorylation. PMID:28874508
A method for independent modelling in support of regulatory review of dose assessments.
Dverstorp, Björn; Xu, Shulan
2017-11-01
Several countries consider geological disposal facilities as the preferred option for spent nuclear fuel due to their potential to provide isolation from the surface environment on very long timescales. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a spent nuclear fuel repository. The disposal method involves disposing spent fuel in copper canisters with a cast iron insert at about 500 m depth in crystalline basement rock, and each canister is surrounded by a buffer of swelling bentonite clay. SKB's license application is supported by a post-closure safety assessment, SR-Site. SR-Site has been reviewed by the Swedish Radiation Safety Authority (SSM) for five years. The main method for review of SKB's license application is document review, which is carried out by SSM's staff and supported by SSM's external experts. The review has proven a challenging task due to its broad scope, complexity and multidisciplinary nature. SSM and its predecessors have, for several decades, been developing independent models to support regulatory reviews of post-closure safety assessments for geological repositories. For the review of SR-Site, SSM has developed a modelling approach with a structured application of independent modelling activities, including replication modelling, use of alternative conceptual models and bounding calculations, to complement the traditional document review. This paper describes this scheme and its application to biosphere and dose assessment modelling. SSM's independent modelling has provided important insights regarding quality and reasonableness of SKB's rather complex biosphere modelling and has helped quantifying conservatisms and highlighting conceptual uncertainty. Copyright © 2017 Elsevier Ltd. All rights reserved.
Sampling and analyses plan for tank 103 at the 219-S waste handling facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
FOWLER, K.D.
1999-06-23
This document describes the sampling and analysis activities associated with taking a Resource Conservation and Recovery Act (RCRA) protocol sample of the waste from Tank 103 at the 21 9-S Waste Handling Facility treatment storage, andlor disposal (TSD) unit at the 2224 Laboratory complex. This sampling and analyses is required based on negotiations between the State of Washington Department of Ecology (Ecology) and the Department of Energy, Richland Operations, (RL) in letters concerning the TPA Change Form M-32-98-01. In a letter from George H. Sanders, RL to Moses N. Jaraysi, Ecology, dated January 28,1999, it was noted that ''Prior tomore » the Tank 103 waste inventory transfer, a RCRA protocol sample of the waste will be obtained and tested for the constituents contained on the Part A, Form 3 Permit Application for the 219-S Waste Handling Facility.'' In the April 2, 1999 letter, from Brenda L. Becher-Khaleel, Ecology to James, E. Rasmussen, RL, and William O. Adair, FDH, Ecology states that the purpose of these analyses is to provide information and justification for leaving Tank 103 in an isolated condition in the 2194 TSD unit until facility closure. The data may also be used at some future date in making decisions regarding closure methodology for Tank 103. Ecology also notes that As Low As Reasonably Achievable (ALARA) concerns may force deviations from some SW-846 protocol. Every effort will be made to accommodate requirements as specified. Deviations from SW-846 will be documented in accordance with HASQARD.« less
THE EPA MICROBIAL SOURCE TRACKING DOCUMENT
Beach closures or violations of total maximum daily loads of fecal organisms in watersheds frequently generate a need to identify the major sources of contamination or, at least, determine whether the source is human or animal. A few years ago E. coli ribotyping was the only met...
Individual differences in epistemic motivation and brain conflict monitoring activity.
Kossowska, Małgorzata; Czarnek, Gabriela; Wronka, Eligiusz; Wyczesany, Miroslaw; Bukowski, Marcin
2014-06-06
It is well documented that motivation toward closure (NFC), defined as a desire for a quick and unambiguous answer to a question and an aversion to uncertainty, is linked to more structured, rigid, and persistent cognitive styles. However, the neurocognitive correlates of NFC have never been tested. Thus, using event-related potentials, we examined the hypothesis that NFC is associated with the neurocognitive process for detecting discrepancies between response tendencies and higher level intentions. We found that greater NFC is associated with lower conflict-related anterior cingulate activity, suggesting lower sensitivity to cues for altering a habitual response pattern and lower sensitivity to committing errors. This study provides evidence that high NFC acts as a bulwark against anxiety-producing uncertainty and minimizes the experience of error. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Baker, A. J.
1982-01-01
An order-of-magnitude analysis of the subsonic three dimensional steady time averaged Navier-Stokes equations, for semibounded aerodynamic juncture geometries, yields the parabolic Navier-Stokes simplification. The numerical solution of the resultant pressure Poisson equation is cast into complementary and particular parts, yielding an iterative interaction algorithm with an exterior three dimensional potential flow solution. A parabolic transverse momentum equation set is constructed, wherein robust enforcement of first order continuity effects is accomplished using a penalty differential constraint concept within a finite element solution algorithm. A Reynolds stress constitutive equation, with low turbulence Reynolds number wall functions, is employed for closure, using parabolic forms of the two-equation turbulent kinetic energy-dissipation equation system. Numerical results document accuracy, convergence, and utility of the developed finite element algorithm, and the CMC:3DPNS computer code applied to an idealized wing-body juncture region. Additional results document accuracy aspects of the algorithm turbulence closure model.
Integration of actomyosin contractility with cell-cell adhesion during dorsal closure.
Duque, Julia; Gorfinkiel, Nicole
2016-12-15
In this work, we combine genetic perturbation, time-lapse imaging and quantitative image analysis to investigate how pulsatile actomyosin contractility drives cell oscillations, apical cell contraction and tissue closure during morphogenesis of the amnioserosa, the main force-generating tissue during the dorsal closure in Drosophila We show that Myosin activity determines the oscillatory and contractile behaviour of amnioserosa cells. Reducing Myosin activity prevents cell shape oscillations and reduces cell contractility. By contrast, increasing Myosin activity increases the amplitude of cell shape oscillations and the time cells spend in the contracted phase relative to the expanded phase during an oscillatory cycle, promoting cell contractility and tissue closure. Furthermore, we show that in AS cells, Rok controls Myosin foci formation and Mbs regulates not only Myosin phosphorylation but also adhesion dynamics through control of Moesin phosphorylation, showing that Mbs coordinates actomyosin contractility with cell-cell adhesion during amnioserosa morphogenesis. © 2016. Published by The Company of Biologists Ltd.
Can the vector space model be used to identify biological entity activities?
2011-01-01
Background Biological systems are commonly described as networks of entity interactions. Some interactions are already known and integrate the current knowledge in life sciences. Others remain unknown for long periods of time and are frequently discovered by chance. In this work we present a model to predict these unknown interactions from a textual collection using the vector space model (VSM), a well known and established information retrieval model. We have extended the VSM ability to retrieve information using a transitive closure approach. Our objective is to use the VSM to identify the known interactions from the literature and construct a network. Based on interactions established in the network our model applies the transitive closure in order to predict and rank new interactions. Results We have tested and validated our model using a collection of patent claims issued from 1976 to 2005. From 266,528 possible interactions in our network, the model identified 1,027 known interactions and predicted 3,195 new interactions. Iterating the model according to patent issue dates, interactions found in a given past year were often confirmed by patent claims not in the collection and issued in more recent years. Most confirmation patent claims were found at the top 100 new interactions obtained from each subnetwork. We have also found papers on the Web which confirm new inferred interactions. For instance, the best new interaction inferred by our model relates the interaction between the adrenaline neurotransmitter and the androgen receptor gene. We have found a paper that reports the partial dependence of the antiapoptotic effect of adrenaline on androgen receptor. Conclusions The VSM extended with a transitive closure approach provides a good way to identify biological interactions from textual collections. Specifically for the context of literature-based discovery, the extended VSM contributes to identify and rank relevant new interactions even if these interactions occcur in only a few documents in the collection. Consequently, we have developed an efficient method for extracting and restricting the best potential results to consider as new advances in life sciences, even when indications of these results are not easily observed from a mass of documents. PMID:22369514
40 CFR 258.50 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...
40 CFR 258.50 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...
40 CFR 258.50 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...
40 CFR 258.50 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...
Engineering criteria for fracture flowback procedures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barree, R.D.; Mukherjee, H.
1995-12-31
Post treatment fracture flowback procedures during closure are often critical to the retention of fracture conductivity near the wellbore. Postfrac production performance largely depends on this conductivity. The importance of proper flowback procedure has been documented in the fracture industry, but definitive guidelines for flowback design have never been established. As a result, many misconceptions exist regarding the physics of proppant flowback and its effects on the final proppant distribution in the fracture. This paper presents a rigorous study of fracture flowback and proppant migration during closure using a fully three-dimensional fracture geometry simulator (GOHFER). The effects of rate ofmore » flowback, location of the perforation interval, final proppant concentration, and the fracture geometry prior to flowback on the retained post closure proppant concentration are discussed. Consideration is given to the fluid velocity field in the created fracture resulting from the flowback, and its effects on proppant movement and localized fracture closure. These studies illustrate the difference between ``forced closure`` and ``reverse screenout`` concepts in flowback design. Other effects such as crossflow between multiple perforated layers are also studied. Simulation studies indicate that selection of a desirable flowback rate is very sensitive to crossflow effects resulting from induced fractures in multiple stress layers. This crossflow can result in significant overflushing of proppant in the lower stress zones, if not countered by properly applied flowback procedures.« less
Navarro, J. Alexander; Kohl, Katrin S.; Cetron, Martin S.; Markel, Howard
2017-01-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. PMID:26921384
Navarro, J Alexander; Kohl, Katrin S; Cetron, Martin S; Markel, Howard
2016-06-01
Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. Copyright © 2016 by Duke University Press.
40 CFR 264.142 - Cost estimate for closure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the cost of final closure at the point in the facility's active life when the extent and manner of its... costs for on-site disposal if he can demonstrate that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure cost estimate may not incorporate any salvage value that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss and Catherine Birney
2011-05-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08,more » Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.« less
The fission yeast cytokinetic contractile ring regulates septum shape and closure
Thiyagarajan, Sathish; Munteanu, Emilia Laura; Arasada, Rajesh; Pollard, Thomas D.; O'Shaughnessy, Ben
2015-01-01
ABSTRACT During cytokinesis, fission yeast and other fungi and bacteria grow a septum that divides the cell in two. In fission yeast closure of the circular septum hole by the β-glucan synthases (Bgs) and other glucan synthases in the plasma membrane is tightly coupled to constriction of an actomyosin contractile ring attached to the membrane. It is unknown how septum growth is coordinated over scales of several microns to maintain septum circularity. Here, we documented the shapes of ingrowing septum edges by measuring the roughness of the edges, a measure of the deviation from circularity. The roughness was small, with spatial correlations indicative of spatially coordinated growth. We hypothesized that Bgs-mediated septum growth is mechanosensitive and coupled to contractile ring tension. A mathematical model showed that ring tension then generates almost circular septum edges by adjusting growth rates in a curvature-dependent fashion. The model reproduced experimental roughness statistics and showed that septum synthesis sets the mean closure rate. Our results suggest that the fission yeast cytokinetic ring tension does not set the constriction rate but regulates septum closure by suppressing roughness produced by inherently stochastic molecular growth processes. PMID:26240178
The fission yeast cytokinetic contractile ring regulates septum shape and closure.
Thiyagarajan, Sathish; Munteanu, Emilia Laura; Arasada, Rajesh; Pollard, Thomas D; O'Shaughnessy, Ben
2015-10-01
During cytokinesis, fission yeast and other fungi and bacteria grow a septum that divides the cell in two. In fission yeast closure of the circular septum hole by the β-glucan synthases (Bgs) and other glucan synthases in the plasma membrane is tightly coupled to constriction of an actomyosin contractile ring attached to the membrane. It is unknown how septum growth is coordinated over scales of several microns to maintain septum circularity. Here, we documented the shapes of ingrowing septum edges by measuring the roughness of the edges, a measure of the deviation from circularity. The roughness was small, with spatial correlations indicative of spatially coordinated growth. We hypothesized that Bgs-mediated septum growth is mechanosensitive and coupled to contractile ring tension. A mathematical model showed that ring tension then generates almost circular septum edges by adjusting growth rates in a curvature-dependent fashion. The model reproduced experimental roughness statistics and showed that septum synthesis sets the mean closure rate. Our results suggest that the fission yeast cytokinetic ring tension does not set the constriction rate but regulates septum closure by suppressing roughness produced by inherently stochastic molecular growth processes. © 2015. Published by The Company of Biologists Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zou, Ling; Berry, R. A.; Martineau, R. C.
The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 codemore » utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.« less
Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bamberger, Judith A; Burks, Barry L; Quigley, Keith D
2001-09-28
The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less
ERIC Educational Resources Information Center
Stephens, Dawn L.; Collins, Michael D.; Dodder, Richard A.
2005-01-01
Recent legislation, especially the Americans with Disabilities Act in 1990, generated the closure of institutions for people with disabilities and inclusion into community residences and employment. It has been well documented that individuals with developmental disabilities often experience difficulties with employment including both obtaining…
On Subsurface Fracture Opening and Closure
NASA Astrophysics Data System (ADS)
Wang, Y.
2016-12-01
Mechanistic understanding of fracture opening and closure in geologic media is of significant importance to nature resource extraction and waste management, such as geothermal energy extraction, oil/gas production, radioactive waste disposal, and carbon sequestration and storage). A dynamic model for subsurface fracture opening and closure has been formulated. The model explicitly accounts for the stress concentration around individual aperture channels and the stress-activated mineral dissolution and precipitation. A preliminary model analysis has demonstrated the importance of the stress-activated dissolution mechanism in the evolution of fracture aperture in a stressed geologic medium. The model provides a reasonable explanation for some key features of fracture opening and closure observed in laboratory experiments, including a spontaneous switch from a net permeability reduction to a net permeability increase with no changes in a limestone fracture experiment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
The following site closure activities were performed at the 34 Corrective Action Sites (CASs) comprising Corrective Action Unit (CAU) 417 and are documented in this report: (1) No closure action was taken at 13 CASs (17 sites): 58-05-01,58-07-01,58-05-04, 58-09-05 (Mud Pits C and D only), 58-35-01,58-05-02,58-09-06 (Mud Pits A, B, C, and D), 58-10-06,58-19-01,58-35-02,58-44-04,58-05-04, and 58-09-03 (Mud Pit E only). (2) Housekeeping activities, collecting scrap materials, and transporting to approved landfill sites at the NTS were used to close seven CASs: 58-44-01,58-44-02,58-44-05, 58-98-03,58-98-01,58-98-02, and 58-98-04. (3) Two CASs (58-05-03 and 58-99-01) were closed by excavation and removal of USTs. (4)more » Two septic tanks (CASs 58-05-05 and 58-05-06) were closed by backfilling with clean fill. (5) Site posting with above-grade monuments and attached warning signs and land-use restrictions were used to close seven CASs (nine sites): 58-09-02,58-09-05 (Mud Pit E only), 58-09-06 (Mud Pit E only), 58-10-01,58-25-01,58-09-03 (Mud Pits A, B, and D), and 58-10-05. (6) Clean closure by excavation soil with TPH levels greater than the NDEP action level of 100 mg/kg and limited regrading was used to close five CASs: 58-10-03,58-44-06, 58-44-03,58-10-02, and 58-10-04. (7) Construction of engineered covers was used to close in place two CASs: 58-09-01 and 58-09-03 (Mud Pit C only). Following construction, a fence was constructed around each cover to prevent damage to the cover or intrusion by wildlife.« less
Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.
2012-05-07
This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less
Spark plasma sintering and porosity studies of uranium nitride
NASA Astrophysics Data System (ADS)
Johnson, Kyle D.; Wallenius, Janne; Jolkkonen, Mikael; Claisse, Antoine
2016-05-01
In this study, a number of samples of UN sintered by the SPS method have been fabricated, and highly pure samples ranging in density from 68% to 99.8%TD - corresponding to an absolute density of 14.25 g/cm3 out of a theoretical density of 14.28 g/cm3 - have been fabricated. By careful adjustment of the sintering parameters of temperature and applied pressure, the production of pellets of specific porosity may now be achieved between these ranges. The pore closure behaviour of the material has also been documented and compared to previous studies of similar materials, which demonstrates that full pore closure using these methods occurs near 97.5% of relative density.
Neutral endopeptidase inhibition in diabetic wound repair.
Spenny, Michelle L; Muangman, Pornprom; Sullivan, Stephen R; Bunnett, Nigel W; Ansel, John C; Olerud, John E; Gibran, Nicole S
2002-01-01
In response to cutaneous injury, sensory nerves release substance P, a proinflammatory neuropeptide. Substance P stimulates mitogenesis and migration of keratinocytes, fibroblasts, and endothelial cells. Neutral endopeptidase (NEP), a cell surface metallopeptidase, degrades substance P. Chronic nonhealing wounds and skin from patients with diabetes mellitus show increased NEP localization and activity. We hypothesized that increased NEP may retard wound healing and that NEP inhibition would improve closure kinetics in an excisional murine wound model. NEP enzyme activity was measured in skin samples from mutant diabetic mice (db/db) and nondiabetic (db/-) littermates by degradation of glutaryl-ala-ala-phe-4-methoxy-2-naphthylamine. Full-thickness 6-mm dorsal excisional wounds treated with normal saline or the NEP inhibitor thiorphan (10 microM or 25 microM) for 7 days were followed until closure. Histological examination and NEP activity were evaluated in a subset of wounds. NEP activity in unwounded db/db skin (20.6 pmol MNA/hr/ microg) significantly exceeded activity in db/-skin (7.9 pmol MNA/hr/ microg; p = 0.02). In db/db mice, 25 microM thiorphan shortened time to closure (18.0 days; p < 0.05) compared to normal saline (23.5 days). NEP inhibition did not alter closure kinetics in db/-mice. While the inflammatory response appeared enhanced in early wounds treated with thiorphan, blinded histological scoring of healed wounds using a semiquantitative scale showed no difference in inflammation. Unwounded skin from diabetic mice shows increased NEP activity and NEP inhibition improved wound closure kinetics without affecting contraction, suggesting that its principal effect was to augment epithelialization.
Windham-Myers, Lisamarie; Marvin-DiPasquale, Mark C.; Agee, Jennifer L.; Kieu, Le H.; Kakouros, Evangelos; Erikson, Li H.; Ward, Kristen
2010-01-01
The restoration of 18 acres of historic tidal marsh at Crissy Field has had great success in terms of public outreach and visibility, but less success in terms of revegetated marsh sustainability. Native cordgrass (Spartina foliosa) has experienced dieback and has failed to recolonize following extended flooding events during unintended periodic closures of its inlet channel, which inhibits daily tidal flushing. We examined the biogeochemical impacts of these impoundment events on plant physiology and on sulfur and mercury chemistry to help the National Park Service land managers determine the relative influence of these inlet closures on marsh function. In this comparative study, we examined key pools of sulfur, mercury, and carbon compounds both during and between closure events. Further, we estimated the net hydrodynamic flux of methylmercury and total mercury to and from the marsh during a 24-hour diurnal cycle. This report documents the methods used and the data generated during the study.
Feasibility and safety of a new generation of gore septal occluder device in children.
Lombardi, Maristella; Tagliente, Maria R; Pirolo, Teodoro; Massari, Elena; Milella, Leonardo; Vairo, Ugo
2016-12-01
Transcatheter closure of an ostium secundum atrial septal defect (ASD) is now considered the standard care for most of children with the appropriate anatomy, and is a relatively well-tolerated procedure to reduce the clinical sequelae of ASD, with a low complication rate. The present case reports describe our clinical experience of the percutaneous closure of a secundum ASD in 10 children between December 2011 and November 2012, by means of a new generation of device, the GORE Septal Occluder device. The implantation was successful in all except two cases, the device being properly placed and deployed without malposition or embolization in the catheterization laboratory. No complications were related to the procedure. The successful implant was confirmed and no major adverse events were documented in the following 3-12 months. The new GORE Septal Occluder device appears to be a feasible, well-tolerated and successful tool for the closure of an ASD of 15 mm or less in childhood.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-07-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.; Yucel, V.; Desotell, L.
2006-07-01
The long-term safety of U.S. Department of Energy (DOE) low-level radioactive disposal facilities is assessed by conducting a performance assessment -- a systematic analysis that compares estimated risks to the public and the environment with performance objectives contained in DOE Manual 435.1-1, Radioactive Waste Management Manual. Before site operations, facilities design features such as final inventory, waste form characteristics, and closure cover design may be uncertain. Site operators need a modeling tool that can be used throughout the operational life of the disposal site to guide decisions regarding the acceptance of problematic waste streams, new disposal cell design, environmental monitoringmore » program design, and final site closure. In response to these needs the National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has developed a decision support system for the Area 5 Radioactive Waste Management Site in Frenchman Flat on the Nevada Test Site. The core of the system is a probabilistic inventory and performance assessment model implemented in the GoldSim{sup R} simulation platform. The modeling platform supports multiple graphic capabilities that allow clear documentation of the model data sources, conceptual model, mathematical implementation, and results. The combined models have the capability to estimate disposal site inventory, contaminant concentrations in environmental media, and radiological doses to members of the public engaged in various activities at multiple locations. The model allows rapid assessment and documentation of the consequences of waste management decisions using the most current site characterization information, radionuclide inventory, and conceptual model. The model is routinely used to provide annual updates of site performance, evaluate the consequences of disposal of new waste streams, develop waste concentration limits, optimize the design of new disposal cells, and assess the adequacy of environmental monitoring programs. (authors)« less
36 CFR 13.1242 - BCDA closures and restrictions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...
36 CFR 13.1242 - BCDA closures and restrictions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...
36 CFR 13.1242 - BCDA closures and restrictions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...
36 CFR 13.1242 - BCDA closures and restrictions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... prohibit or otherwise restrict activities in the BCDA to protect public health and safety or park resources. Information on BCDA closures and restrictions will be available for inspection at the park visitor center...
Garlena, Rebecca A.; Lennox, Ashley L.; Baker, Lewis R.; Parsons, Trish E.; Weinberg, Seth M.; Stronach, Beth E.
2015-01-01
A leading cause of human birth defects is the incomplete fusion of tissues, often manifested in the palate, heart or neural tube. To investigate the molecular control of tissue fusion, embryonic dorsal closure and pupal thorax closure in Drosophila are useful experimental models. We find that Pvr mutants have defects in dorsal midline closure with incomplete amnioserosa internalization and epidermal zippering, as well as cardia bifida. These defects are relatively mild in comparison to those seen with other signaling mutants, such as in the JNK pathway, and we demonstrate that JNK signaling is not perturbed by altering Pvr receptor tyrosine kinase activity. Rather, modulation of Pvr levels in the ectoderm has an impact on PIP3 membrane accumulation, consistent with a link to PI3K signal transduction. Polarized PI3K activity influences protrusive activity from the epidermal leading edge and the protrusion area changes in accord with Pvr signaling intensity, providing a possible mechanism to explain Pvr mutant phenotypes. Tissue-specific rescue experiments indicate a partial requirement in epithelial tissue, but confirm the essential role of Pvr in hemocytes for embryonic survival. Taken together, we argue that inefficient removal of the internalizing amnioserosa tissue by mutant hemocytes coupled with impaired midline zippering of mutant epithelium creates a situation in some embryos whereby dorsal midline closure is incomplete. Based on these observations, we suggest that efferocytosis (corpse clearance) could contribute to proper tissue closure and thus might underlie some congenital birth defects. PMID:26293306
76 FR 27924 - Draft Regulatory Guide, Guidance for ITAAC Closure
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... received on or before this date. Although a time limit is given, comments and suggestions in connection... are encouraged at any time. ADDRESSES: Please include Docket ID NRC-2011-0102 in the subject line of... comments to: RADB at 301-492-3446. You can access publicly available documents related to this notice using...
Maintaining Positive Educator Morale during Consolidation.
ERIC Educational Resources Information Center
Appalachia Educational Lab., Charleston, WV.
The flight of middle class families from the cities to the suburbs has left many cities hard pressed to continue services at former levels. Falling enrollments and revenues have led to mergers of city and county school districts or closures of city districts followed by county takeover. This report documents educators' experience of city-county…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-02
..., Medicare--Hospital Insurance; and Program No. 93.774, Medicare-- Supplementary Medical Insurance Program.... SUMMARY: This document corrects a typographical error that appeared in the notice published in the Federal... typographical error that is identified and corrected in the Correction of Errors section below. II. Summary of...
DOT National Transportation Integrated Search
2015-08-01
This document is the fourth of a seven volume report that describe the Performance Requirements for the connected vehicle vehicle-to-infrastructure (V2I) safety applications developed for the U.S. Department of Transportation (U.S. DOT). This volume ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gutzeit, Jennifer L.; Kennedy, Ellen P.; Bjornstad, Bruce N.
2011-02-02
The U.S. Department of Energy Richland Operations Office is proposing to close the Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL) located in the 600 Area of the Hanford Site. The closure of the NRDWL/SWL entails the construction of an evapotranspiration cover over the landfill. This cover would consist of a 3-foot (1-meter) engineered layer of fine-grained soil, modified with 15 percent by weight pea gravel to form an erosion-resistant topsoil that will sustain native vegetation. The area targeted for silt-loam borrow soil sits in Area C, located in the northern central portion of the Fitzner/Eberhardt Arid Landsmore » Ecology (ALE) Reserve Unit. The pea gravel used for the mixture will be obtained from both off-site commercial sources and an active gravel pit (Pit #6) located just west of the 300 Area of the Hanford Site. Materials for the cover will be transported along Army Loop Road, which runs from Beloit Avenue (near the Rattlesnake Barricade) east-northeast to the NRDWL/SWL, ending at State Route 4. Upgrades to Army Loop Road are necessary to facilitate safe bidirectional hauling traffic. This report documents a cultural resources review of the proposed activity, conducted according to Section 106 of the National Historic Preservation Act of 1966.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, Nevada Operations Office
2000-02-08
This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
Perera, Shamira A; Quek, Desmond T; Baskaran, Mani; Tun, Tin A; Kumar, Rajesh S; Friedman, David S; Aung, Tin
2010-06-01
To evaluate EyeCam in detecting changes in angle configuration after laser peripheral iridotomy (LPI) in comparison to gonioscopy, the reference standard. Prospective comparative study. Twenty-four subjects (24 eyes) with primary angle-closure glaucoma (PACG) were recruited. Gonioscopy and EyeCam (Clarity Medical Systems) imaging of all 4 angle quadrants were performed, before and 2 weeks after LPI. Images were graded according to angle structures visible by an observer masked to clinical data or the status of LPI, and were performed in a random order. Angle closure in a quadrant was defined as the inability to visualize the posterior trabecular meshwork. We determined the number of quadrants with closed angles and the mean number of clock hours of angle closure before and after LPI in comparison to gonioscopy. Using EyeCam, all 24 eyes showed at least 1 quadrant of angle widening after LPI. The mean number of clock hours of angle closure decreased significantly, from 8.15 +/- 3.47 clock hours before LPI to 1.75 +/- 2.27 clock hours after LPI (P < .0001, Wilcoxon signed rank test). Overall, gonioscopy showed 1.0 +/- 1.41 (95% CI, 0.43-1.57) quadrants opening from closed to open after LPI compared to 2.0 +/- 1.28 (95% CI, 1.49-2.51, P = .009) quadrants with EyeCam. Intra-observer reproducibility of grading the extent of angle closure in clock hours in EyeCam images was moderate to good (intraclass correlation coefficient 0.831). EyeCam may be used to document changes in angle configuration after LPI in eyes with PACG. Copyright 2010 Elsevier Inc. All rights reserved.
Mirzaali, Mikaeil; Dooley, Maureen; Wynne, Dylan; Cooter, Nina; Lee, Lorraine; Haworth, Peter; Saha, Romi; Gainsborough, Nicola; Hildick-Smith, David
2015-11-15
Patent foramen ovale has been identified as a conduit for paradoxical embolism resulting in cryptogenic stroke or transient ischemic attack (TIA). We aimed to establish rates of death, recurrent stroke or TIA among patients undergoing PFO closure for stroke or TIA at our unit. A retrospective analysis of all PFO closure patients was performed between May 2004 and January 2013. Follow up was performed by mortality tracing using the Medical Research Information Service of the Office of National Statistics. With regard to stroke or TIA recurrence, written consent forms and questionnaires were mailed with follow up telephone calls. Medical notes and imaging records were consulted where adverse events were noted. 301 patients aged 48.6 ± 11.0 years, 54.4% male, with ≥1 thromboembolic neurovascular event had percutaneous PFO closure with one of eight devices, with successful implantation in 99% of cases. Follow-up duration was 40.2 ± 26.2 months (range 1.3-105.3); complete in 301 patients for mortality (100%) and 283 patients (94.0%) for neurovascular events. Two patients died during follow-up (respiratory failure n = 1; road traffic accident n = 1). Recurrent stroke (MRI or CT confirmed) was observed in five patients (0.5%; 0.55 per 100 person-years) and TIA in 9 (1.1%; 0.98 per 100 person-years). Atrial fibrillation requiring treatment was documented in 14 patients (1.7%). Percutaneous PFO closure in patients with cryptogenic stroke or TIA is a safe treatment with a low incidence of procedural complications and recurrent neurovascular events. Registry data like these may help to demonstrate the utility of PFO closure in stroke. © 2015 Wiley Periodicals, Inc.
Pepeta, Lungile; Greyling, Adele; Nxele, Mahlubandile Fintan; Makrexeni, Zongezile Masonwabe
2017-01-01
Background: Percutaneous closure of patent ductus arteriosus (PDA) has become standard therapy. Experience with the Occlutech® Duct Occluder is limited. Methods: Data regarding ductal closure using Occlutech® Duct Occluder were reviewed and prospectively collected. Demographics, hemodynamic and angiographic characteristics, complications, and outcomes were documented. Results: From March 2013 to June 2016, 65 patients (43 females and 22 males) underwent percutaneous closure of the PDA using Occlutech® Duct Occluder. The median age of the patients was 11 months (range, 1–454 months) and the median weight was 8.5 kg (range 2.5–78 kg). The mean pulmonary artery median pressure was 27 mmHg (range, 12–100 mmHg) and the QP: Qs ratio median was 1.8 (range, 1–7.5), with a pulmonary vascular resistance mean of 2.7 WU (standard deviation [SD] ±2.1). Thirty-two patients had Krichenko Type A duct (49%); 7, Type C (11%); 4, Type D (6%); and 22, Type E (34%). The ductal size (narrowest diameter at the pulmonic end) mean was 3.5 mm (SD ± 1.9 mm). The screening time mean was 17.3 min (SD ± 11.6). Out of 63 patients with successful closure of the PDA using Occlutech® Duct Occluder, there were 15 patients with small PDAs; 25 with moderate PDAs, and 23 with large PDAs. In one patient, the device dislodged to the descending aorta, and in two patients, to the right pulmonary artery immediately following deployment, with successful percutaneous (two) and surgical (one) retrieval. Complete ductal occlusion was achieved in all 63 patients on day one. Conclusion: The Occlutech® Duct Occluder is a safe and effective device for closure of ducts in appropriately selected patients. PMID:28566820
Pepeta, Lungile; Greyling, Adele; Nxele, Mahlubandile Fintan; Makrexeni, Zongezile Masonwabe
2017-01-01
Percutaneous closure of patent ductus arteriosus (PDA) has become standard therapy. Experience with the Occlutech® Duct Occluder is limited. Data regarding ductal closure using Occlutech® Duct Occluder were reviewed and prospectively collected. Demographics, hemodynamic and angiographic characteristics, complications, and outcomes were documented. From March 2013 to June 2016, 65 patients (43 females and 22 males) underwent percutaneous closure of the PDA using Occlutech® Duct Occluder. The median age of the patients was 11 months (range, 1-454 months) and the median weight was 8.5 kg (range 2.5-78 kg). The mean pulmonary artery median pressure was 27 mmHg (range, 12-100 mmHg) and the QP: Qs ratio median was 1.8 (range, 1-7.5), with a pulmonary vascular resistance mean of 2.7 WU (standard deviation [SD] ±2.1). Thirty-two patients had Krichenko Type A duct (49%); 7, Type C (11%); 4, Type D (6%); and 22, Type E (34%). The ductal size (narrowest diameter at the pulmonic end) mean was 3.5 mm (SD ± 1.9 mm). The screening time mean was 17.3 min (SD ± 11.6). Out of 63 patients with successful closure of the PDA using Occlutech® Duct Occluder, there were 15 patients with small PDAs; 25 with moderate PDAs, and 23 with large PDAs. In one patient, the device dislodged to the descending aorta, and in two patients, to the right pulmonary artery immediately following deployment, with successful percutaneous (two) and surgical (one) retrieval. Complete ductal occlusion was achieved in all 63 patients on day one. The Occlutech® Duct Occluder is a safe and effective device for closure of ducts in appropriately selected patients.
Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan
2014-06-01
Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.
Long-term outcome in dogs with patent ductus arteriosus: 520 cases (1994-2009).
Saunders, A B; Gordon, S G; Boggess, M M; Miller, M W
2014-01-01
Published information regarding survival and long-term cardiac remodeling after patent ductus arteriosus (PDA) closure in dogs is limited. To report outcome and identify prognostic variables in dogs with PDA, and to identify risk factors for persistent remodeling in dogs with a minimum of 12 months of follow-up after closure. Five hundred and twenty client-owned dogs. Retrospective review of medical records of 520 dogs with PDA. Outcome was determined by contacting owners and veterinarians. Dogs with PDA closure and ≥ 12 months of follow-up were asked to return for a re-evaluation. In multivariable analysis of 506 dogs not euthanized at the time of diagnosis, not having a PDA closure procedure negatively affected survival (HzR = 16.9, P < .001). In 444 dogs undergoing successful PDA closure, clinical signs at presentation (HzR = 17, P = .02), concurrent congenital heart disease (HD) (HzR = 4.8, P = .038), and severe mitral regurgitation (MR) documented within 24 hours of closure (HzR = 4.5, P = .028) negatively affected survival. Seventy-one dogs with ≥ 12 months follow-up demonstrated a significant reduction in radiographic and echocardiographic measures of heart size (P = 0) and increased incidence of acquired HD (P = .001) at re-evaluation. Dogs with increased left ventricular size and low fractional shortening at baseline were more likely to have persistent remodeling at re-evaluation. Patent ductus arteriosus closure confers important survival benefits and results in long-term reverse remodeling in most dogs. Clinical signs at presentation, concurrent congenital HD, and severe MR negatively affect survival. Increased left ventricular systolic dimensions and systolic dysfunction at baseline correlated significantly with persistent remodeling. Copyright © 2013 by the American College of Veterinary Internal Medicine.
Reactor refueling containment system
Gillett, J.E.; Meuschke, R.E.
1995-05-02
A method of refueling a nuclear reactor is disclosed whereby the drive mechanism is disengaged and removed by activating a jacking mechanism that raises the closure head. The area between the barrier plate and closure head is exhausted through the closure head penetrations. The closure head, upper drive mechanism, and bellows seal are lifted away and transported to a safe area. The barrier plate acts as the primary boundary and each drive and control rod penetration has an elastomer seal preventing excessive tritium gases from escaping. The individual instrumentation plugs are disengaged allowing the corresponding fuel assembly to be sealed and replaced. 2 figs.
Reactor refueling containment system
Gillett, James E.; Meuschke, Robert E.
1995-01-01
A method of refueling a nuclear reactor whereby the drive mechanism is disengaged and removed by activating a jacking mechanism that raises the closure head. The area between the barrier plate and closure head is exhausted through the closure head penetrations. The closure head, upper drive mechanism, and bellows seal are lifted away and transported to a safe area. The barrier plate acts as the primary boundary and each drive and control rod penetration has an elastomer seal preventing excessive tritium gases from escaping. The individual instrumentation plugs are disengaged allowing the corresponding fuel assembly to be sealed and replaced.
Dong, Y; Dong, F; Zhang, X; Hao, F; Shi, P; Ren, G; Yong, P; Guo, Y
2012-05-01
The aim of this study was to compare velopharyngeal closure between patients who underwent Furlow palatoplasty and two-flap palatoplasty. A retrospective review of 88 patients with incomplete palate cleft was performed. 48 patients (17 males; 31 females) aged 2-28 years received Furlow palatoplasty. 40 patients (17 males; 23 females) aged 2-21 years received two-flap palatoplasty. Velopharyngeal function was categorized as adequate, marginal or inadequate. Complications associated with the operation were documented. Statistically significant differences were not found amongst sex distribution, age at operation, follow-up time, and preoperative speech intelligibility. After primary repairs using Furlow and two-flap palatoplasty, the surgeon's incidence of postoperative palatal fistula was 0%. The complications were not significantly different between the two groups. The authors achieved the lowest reported incidence of postoperative palatal fistulas in primary Furlow palatoplasty. The outcomes of the velopharyngeal closure were better in patients who received Furlow palatoplasty (P<0.05). Furlow palatoplasty was more effective than two-flap palatoplasty in obtaining perfect velopharyngeal closure. A probable explanation may be that Furlow palatoplasty can reposition and overlap the divergent palatal muscle and lengthen the soft palate. Copyright © 2012 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.
Tsai, Chang-Ru; Anderson, Aimee E; Burra, Sirisha; Jo, Juyeon; Galko, Michael J
2017-07-01
Yorkie (Yki), the transcriptional co-activator of the Hippo signaling pathway, has well-characterized roles in balancing apoptosis and cell division during organ growth control. Yki is also required in diverse tissue regenerative contexts. In most cases this requirement reflects its well-characterized roles in balancing apoptosis and cell division. Whether Yki has repair functions outside of the control of cell proliferation, death, and growth is not clear. Here we show that Yki and Scalloped (Sd) are required for epidermal wound closure in the Drosophila larval epidermis. Using a GFP-tagged Yki transgene we show that Yki transiently translocates to some epidermal nuclei upon wounding. Genetic analysis strongly suggests that Yki interacts with the known wound healing pathway, Jun N-terminal kinase (JNK), but not with Platelet Derived Growth Factor/Vascular-Endothelial Growth Factor receptor (Pvr). Yki likely acts downstream of or parallel to JNK signaling and does not appear to regulate either proliferation or apoptosis in the larval epidermis during wound repair. Analysis of actin structures after wounding suggests that Yki and Sd promote wound closure through actin regulation. In sum, we found that Yki regulates an epithelial tissue repair process independently of its previously documented roles in balancing proliferation and apoptosis. Copyright © 2017 Elsevier Inc. All rights reserved.
Method and apparatus for active tamper indicating device using optical time-domain reflectometry
Smith, D. Barton; Muhs, Jeffrey D.; Pickett, Chris A.; Earl, D. Duncan
1999-01-01
An optical time-domain reflectometer (OTDR) launches pulses of light into a link or a system of multiplexed links and records the waveform of pulses reflected by the seals in the link(s). If a seal is opened, the link of cables will become a discontinuous transmitter of the light pulses and the OTDR can immediately detect that a seal has been opened. By analyzing the waveform, the OTDR can also quickly determine which seal(s) were opened. In this way the invention functions as a system of active seals. The invention is intended for applications that require long-term surveillance of a large number of closures. It provides immediate tamper detection, allows for periodic access to secured closures, and can be configured for many different distributions of closures. It can monitor closures in indoor and outdoor locations and it can monitor containers or groups of containers located many kilometers apart.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Computation of Anisotropic Bi-Material Interfacial Fracture Parameters and Delamination Creteria
NASA Technical Reports Server (NTRS)
Chow, W-T.; Wang, L.; Atluri, S. N.
1998-01-01
This report documents the recent developments in methodologies for the evaluation of the integrity and durability of composite structures, including i) the establishment of a stress-intensity-factor based fracture criterion for bimaterial interfacial cracks in anisotropic materials (see Sec. 2); ii) the development of a virtual crack closure integral method for the evaluation of the mixed-mode stress intensity factors for a bimaterial interfacial crack (see Sec. 3). Analytical and numerical results show that the proposed fracture criterion is a better fracture criterion than the total energy release rate criterion in the characterization of the bimaterial interfacial cracks. The proposed virtual crack closure integral method is an efficient and accurate numerical method for the evaluation of mixed-mode stress intensity factors.
Accounting for mean-flow periodicity in turbulence closures
NASA Astrophysics Data System (ADS)
Younis, Bassam A.; Zhou, Ye
2006-01-01
Measurements of the turbulence energy spectrum in the unsteady wakes of bodies in uniform incident streams clearly show the presence of a distinct peak in energy supply that occurs at the Strouhal frequency and whose presence implies a strong and direct interaction between the organized mean-flow unsteadiness and the random turbulence motions. It is argued here that the well-documented failure of conventional turbulence closures in capturing the main features of unsteady flows is largely due to their inability to properly account for the modifications in the energy spectrum wrought by these interactions. We derive a simple modification to the turbulence length-scale determining equation based on analysis of a distorted energy spectrum, and verify the result by computations of vortex shedding behind a square cylinder.
RUSSO, JOHN M.; FLORIAN, PETER; SHEN, LE; GRAHAM, W. VALLEN; TRETIAKOVA, MARIA S.; GITTER, ALFRED H.; MRSNY, RANDALL J.; TURNER, JERROLD R.
2005-01-01
Background & Aims Small epithelial wounds heal by purse-string contraction of an actomyosin ring that is regulated by myosin light chain (MLC) kinase (MLCK) and rho kinase (ROCK). These studies aimed to define the roles of these kinases in purse-string wound closure. Methods Oligocellular and single-cell wounds were created in intestinal epithelial monolayers. Fluorescence imaging and electrophysiologic data were collected during wound closure. Human biopsies were studied immunohistochemically. Results Live-cell imaging of enhanced green fluorescent protein-β-actin defined rapid actin ring assembly within 2 minutes after wounding. This progressed to a circumferential ring within 8 minutes that subsequently contracted and closed the wound. We therefore divided this process into 2 phases: ring assembly and wound contraction. Activated rho and ROCK localized to the wound edge during ring assembly. Consistent with a primary role in the assembly phase, ROCK inhibition prevented actin ring assembly and wound closure. ROCK inhibition after ring assembly was complete had no effect. Recruitment and activation of MLCK occurred after ring assembly was complete and coincided with ring contraction. MLCK inhibition slowed and then stopped contraction but did not prevent ring assembly. MLCK inhibition also delayed barrier function recovery. Studies of human colonic biopsy specimens suggest that purse-string wound closure also occurs in vivo, because MLC phosphorylation was enhanced surrounding oligocellular wounds. Conclusions These results suggest complementary roles for these kinases in purse-string closure of experimental and in vivo oligocellular epithelial wounds; rho and ROCK are critical for actin ring assembly, while the activity of MLCK drives contraction. PMID:15825080
Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jannik, G.T.; Mamatey, A.; Arnett, M.
1993-10-05
In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
2002-09-01
The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less
Platinum/zeolite catalyst for reforming n-hexane: Kinetic and mechanistic considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lane, G.S.; Modica, F.S.; Miller, J.T.
A platinum/L-zeolite-reforming catalyst exhibits activity and selectivity for converting n-hexane into benzene than other Pt catalyst. The reaction pathways indicate that for all catalysts, e.g., Pt/K L or Pt/K Y, benzene is formed as a primary product by one-six-ring closure and methylcyclopentane is formed as a primary product via one-five-ring closure. The ratio for one-six to one-five-ring closure, however, is about two times greater for the Pt/K L than for the Pt/K Y, or other platinum catalysts. The preference for the one-six-ring closure in L zeolite appears to be related to the optimum pore size of the L zeolite. Inmore » addition to an increased selectivity for one-six-ring closure, the Pt/K L-zeolite catalyst also displays increased reactivity. For example, the turnover frequency of the Pt/K L-zeolite catalyst is 10 times higher for formation of benzene and 3.3 times higher for formation of methylcyclopentane compared with the Pt/K Y-zeolite catalyst. Although the Pt/K L is more reactive than Pt/K Y, the apparent activation energies, 54 kcal/mol for one-six-ring closure and 39 kcal/mol for one-five-ring closure, are the same for both catalysts. Differences in reactivity are associated with an increase in the preexponential term for the Pt/K L catalyst. The increased aromatics selectivity for Pt/K L is consistent with the confinement model which proposes that n-hexane is adsorbed as a six-ring pseudo-cycle resembling the transition state for one-six-ring closure.« less
Camacho-Mauries, Daniel; Rodriguez-Díaz, José Luis; Salgado-Nesme, Noel; González, Quintín H; Vergara-Fernández, Omar
2013-02-01
The use of temporary stomas has been demonstrated to reduce septic complications, especially in high-risk anastomosis; therefore, it is necessary to reduce the number of complications secondary to ostomy takedowns, namely wound infection, anastomotic leaks, and intestinal obstruction. To compare the rates of superficial wound infection and patient satisfaction after pursestring closure of ostomy wound vs conventional linear closure. Patients undergoing colostomy or ileostomy closure between January 2010 and February 2011 were randomly assigned to linear closure (n = 30) or pursestring closure (n = 31) of their ostomy wound. Wound infection within 30 days of surgery was defined as the presence of purulent discharge, pain, erythema, warmth, or positive culture for bacteria. Patient satisfaction, healing time, difficulty managing the wound, and limitation of activities were analyzed with the Likert questionnaire. The infection rate for the control group was 36.6% (n = 11) vs 0% in the pursestring closure group (p < 0.0001). Healing time was 5.9 weeks in the linear closure group and 3.8 weeks in the pursestring group (p = 0.0002). Seventy percent of the patients with pursestring closure were very satisfied in comparison with 20% in the other group (p = 0.0001). This study was limited by the heterogeneity in the type of stoma in both groups. The pursestring method resulted in the absence of infection after ostomy wound closure (shorter healing time and improved patient satisfaction).
Dynamics of hERG closure allow novel insights into hERG blocking by small molecules.
Schmidtke, Peter; Ciantar, Marine; Theret, Isabelle; Ducrot, Pierre
2014-08-25
Today, drug discovery routinely uses experimental assays to determine very early if a lead compound can yield certain types of off-target activity. Among such off targets is hERG. The ion channel plays a primordial role in membrane repolarization and altering its activity can cause severe heart arrhythmia and sudden death. Despite routine tests for hERG activity, rather little information is available for helping medicinal chemists and molecular modelers to rationally circumvent hERG activity. In this article novel insights into the dynamics of hERG channel closure are described. Notably, helical pairwise closure movements have been observed. Implications and relations to hERG inactivation are presented. Based on these dynamics novel insights on hERG blocker placement are presented, compared to literature, and discussed. Last, new evidence for horizontal ligand positioning is shown in light of former studies on hERG blockers.
Closing Plant Stomata Requires a Homolog of an Aluminum-Activated Malate Transporter
Sasaki, Takayuki; Mori, Izumi C.; Furuichi, Takuya; Munemasa, Shintaro; Toyooka, Kiminori; Matsuoka, Ken; Murata, Yoshiyuki; Yamamoto, Yoko
2010-01-01
Plant stomata limit both carbon dioxide uptake and water loss; hence, stomatal aperture is carefully set as the environment fluctuates. Aperture area is known to be regulated in part by ion transport, but few of the transporters have been characterized. Here we report that AtALMT12 (At4g17970), a homolog of the aluminum-activated malate transporter (ALMT) of wheat, is expressed in guard cells of Arabidopsis thaliana. Loss-of-function mutations in AtALMT12 impair stomatal closure induced by ABA, calcium and darkness, but do not abolish either the rapidly activated or the slowly activated anion currents previously identified as being important for stomatal closure. Expressed in Xenopus oocytes, AtALMT12 facilitates chloride and nitrate currents, but not those of organic solutes. Therefore, we conclude that AtALMT12 is a novel class of anion transporter involved in stomatal closure. PMID:20154005
Closing plant stomata requires a homolog of an aluminum-activated malate transporter.
Sasaki, Takayuki; Mori, Izumi C; Furuichi, Takuya; Munemasa, Shintaro; Toyooka, Kiminori; Matsuoka, Ken; Murata, Yoshiyuki; Yamamoto, Yoko
2010-03-01
Plant stomata limit both carbon dioxide uptake and water loss; hence, stomatal aperture is carefully set as the environment fluctuates. Aperture area is known to be regulated in part by ion transport, but few of the transporters have been characterized. Here we report that AtALMT12 (At4g17970), a homolog of the aluminum-activated malate transporter (ALMT) of wheat, is expressed in guard cells of Arabidopsis thaliana. Loss-of-function mutations in AtALMT12 impair stomatal closure induced by ABA, calcium and darkness, but do not abolish either the rapidly activated or the slowly activated anion currents previously identified as being important for stomatal closure. Expressed in Xenopus oocytes, AtALMT12 facilitates chloride and nitrate currents, but not those of organic solutes. Therefore, we conclude that AtALMT12 is a novel class of anion transporter involved in stomatal closure.
NASA Astrophysics Data System (ADS)
Choung, S.; Francis, A. J.; Um, W.; Choi, S.; Kim, S.; Park, J.; Kim, S.
2013-12-01
The countries that have generated nuclear power have facing problems on the disposal of accumulated radioactive wastes. Geological disposal method has been chosen in many countries including Korea. A safety issue after the closure of geological repository has been raised, because microbial activities lead overpressure in the underground facilities through gas production. In particular, biodegradable organic materials derived from low- and intermediate-level radioactive wastes play important role on microbial activities in the geological repository. This study performed large scale in-situ experiments using organic wastes and groundwater, and investigated geochemical alteration and microbial activities at early stage (~63 days) as representative of the period, after closure of the geological repository. The geochemical alteration controlled significantly the microorganism types and populations. Database of the biogeochemical alteration facilitates prediction of radionuclides' mobility and establishment of remedial strategy against unpredictable accidents and hazards at early stage right after closure of the geological repository.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... Commerce, Room 6616, 14th and Constitution Avenue, NW, Washington, DC 20230 (or via the Internet at dHynek... such as marine reserve designations, seasonal closures and gear bans, (2) document the social and economic changes brought about by these regulations, and (3) evaluate the likely socio- economic impacts of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... substantially reducing the harmful effects of impingement and entrainment. As a result, the Agency anticipates... simply EA). This document presents the analysis of compliance costs, closures, energy supply effects, and... propagation of fish, shellfish, and wildlife and provides for recreation in and on the water. 33 U.S.C. 1251(a...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-14
.... ADDRESSES: The Environmental Assessment (EA) is available by request from: Daniel S. Morris, Acting Regional... the keyword search. Locate the document you wish to comment on from the resulting list and click on the ``Submit a Comment'' icon on the right of that line. Mail: Submit written comments to Daniel S...
Ethics and Economics: An Introduction to a Christian Document Now Little Remembered
ERIC Educational Resources Information Center
Doughty, Howard A.
2009-01-01
In the early 1980s, it was not sub-prime mortgages and toxic assets, bank failures and factory closures that crowded the pages of the business section of the daily newspapers. It was something called "stagflation," a noxious combination of inflationary pressures on currency and stagnating levels of production. Still, the effects were…
76 FR 72920 - Notification of a Public Teleconference of the Chartered Science Advisory Board
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... Document ``Considerations Related to Post-Closure Monitoring of Uranium In-Situ ISL/ISR Sites.'' DATES: The... Monitoring of Uranium In-Situ ISL/ISR Sites.'' The SAB will comply with the provisions of FACA and all... Environmental Protection Standards for Uranium and Thorium Mill Tailings in regard to underground In-Situ Leach...
Zhang, Lawrence; Sun, Tiefeng
2017-01-01
Activation of mitogen-activated protein kinases (MAPKs) is one of the earliest responses after plants sense an invading pathogen. Here, we show that MPK3 and MPK6, two Arabidopsis thaliana pathogen-responsive MAPKs, and their upstream MAPK kinases, MKK4 and MKK5, are essential to both stomatal and apoplastic immunity. Loss of function of MPK3 and MPK6, or their upstream MKK4 and MKK5, abolishes pathogen/microbe-associated molecular pattern- and pathogen-induced stomatal closure. Gain-of-function activation of MPK3/MPK6 induces stomatal closure independently of abscisic acid (ABA) biosynthesis and signaling. In contrast, exogenously applied organic acids such as malate or citrate are able to reverse the stomatal closure induced by MPK3/MPK6 activation. Gene expression analysis and in situ enzyme activity staining revealed that malate metabolism increases in guard cells after activation of MPK3/MPK6 or inoculation of pathogen. In addition, pathogen-induced malate metabolism requires functional MKK4/MKK5 and MPK3/MPK6. We propose that the pathogen-responsive MPK3/MPK6 cascade and ABA are two essential signaling pathways that control, respectively, the organic acid metabolism and ion channels, two main branches of osmotic regulation in guard cells that function interdependently to control stomatal opening/closure. PMID:28254778
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
Zheteyeva, Yenlik; Rainey, Jeanette J.; Gao, Hongjiang; Jacobson, Evin U.; Adhikari, Bishwa B.; Shi, Jianrong; Mpofu, Jonetta J.; Bhavnani, Darlene; Dobbs, Thomas; Uzicanin, Amra
2017-01-01
Introduction School closures, while an effective measure against the spread of disease during a pandemic, may carry unintended social and economic consequences for students and families. We evaluated these costs and consequences following a 4-day school closure in Mississippi’s Harrison County School District (HCSD). Methods In a survey of all households with students enrolled in HCSD, we collected information on difficulties related to the school closure, including interruption of employment and pay, loss of access to subsidized school meals, and arrangement of alternative childcare. We analyzed this information in the context of certain demographic characteristics of the survey respondents and households, such as race, level of education, and income. We also estimated the average number of lost work days and documented the childcare alternatives chosen by households affected by the school closure. Results We received 2,229 (28.4%) completed surveys from an estimated 7,851 households eligible to participate. About half (1,082 [48.5%]) of the households experienced at least some difficulty during the closure, primarily in three areas: uncertainty about duration of the closure, lost income, and the effort of arranging alternate childcare. Adults working outside the home, particularly the major wage earner in the household, were more likely to suffer lost income while schools were closed, an effect mitigated by paid leave benefits. Difficulty arranging childcare was reported most frequently by respondents with lower levels of education and households with younger children. Beyond the top three concerns expressed by households in HCSD, the survey also shed light on the issue of food insecurity when subsidized school meals are not available. Reported by 17.9% of households participating in the subsidized school lunch program, difficulty providing meals during the closure was associated with higher numbers of dependent children, selection of “other” as the race of the household respondent, and lower levels of education. Conclusion To help prevent undue financial hardship in families of school children, public health authorities and school administrators should provide recommendations for childcare alternatives and paid leave or remote work options during prolonged school closures, particularly to households in which all adults work outside of the home. PMID:29091717
Factors associated with increasing nursing home closures.
Castle, Nicholas G; Engberg, John; Lave, Judith; Fisher, Andrew
2009-06-01
We determine the rate of nursing home closures for 7 years (1999-2005) and examine internal (e.g., quality), organizational (e.g., chain membership), and external (e.g., competition) factors associated with these closures. The names of the closed facilities and dates of closure from state regulators in all 50 states were obtained. This information was linked to the Online Survey, Certification, and Reporting data, which contains information on internal, organizational, and market factors for almost all nursing homes in the United States. One thousand seven hundred and eighty-nine facilities closed over this time period (1999-2005). The average annual rate of closure was about 2 percent of facilities, but the rate of closure was found to be increasing. Nursing homes with higher rates of deficiency citations, hospital-based facilities, chain members, small bed size, and facilities located in markets with high levels of competition were more likely to close. High Medicaid occupancy rates were associated with a high likelihood of closure, especially for facilities with low Medicaid reimbursement rates. As states actively debate about how to redistribute long-term care services/dollars, our findings show that they should be cognizant of the potential these decisions have for facilitating nursing home closures.
Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosenberger, Kent H.
2013-07-01
The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of Southmore » Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
none
1998-03-01
This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less
When a hazardous waste management unit stops receiving waste at the end of its active life, it must be cleaned up, closed, monitored, and maintained in accordance with the Resource Conservation and Recovery Ac
Teske, Peter R; Hamilton, Healy; Matthee, Conrad A; Barker, Nigel P
2007-08-15
The importance of vicariance events on the establishment of phylogeographic patterns in the marine environment is well documented, and generally accepted as an important cause of cladogenesis. Founder dispersal (i.e. long-distance dispersal followed by founder effect speciation) is also frequently invoked as a cause of genetic divergence among lineages, but its role has long been challenged by vicariance biogeographers. Founder dispersal is likely to be common in species that colonize remote habitats by means of rafting (e.g. seahorses), as long-distance dispersal events are likely to be rare and subsequent additional recruitment from the source habitat is unlikely. In the present study, the relative importance of vicariance and founder dispersal as causes of cladogenesis in a circumglobally distributed seahorse lineage was investigated using molecular dating. A phylogeny was reconstructed using sequence data from mitochondrial and nuclear markers, and the well-documented closure of the Central American seaway was used as a primary calibration point to test whether other bifurcations in the phylogeny could also have been the result of vicariance events. The feasibility of three other vicariance events was explored: a) the closure of the Indonesian Seaway, resulting in sister lineages associated with the Indian Ocean and West Pacific, respectively; b) the closure of the Tethyan Seaway, resulting in sister lineages associated with the Indo-Pacific and Atlantic Ocean, respectively, and c) continental break-up during the Mesozoic followed by spreading of the Atlantic Ocean, resulting in pairs of lineages with amphi-Atlantic distribution patterns. Comparisons of pairwise genetic distances among the seahorse species hypothesized to have diverged as a result of the closure of the Central American Seaway with those of published teleost sequences having the same distribution patterns show that the seahorses were among the last to diverge. This suggests that their cladogenesis was associated with the final closure of this seaway. Although two other divergence events in the phylogeny could potentially have arisen as a result of the closures of the Indonesian and Tethyan seaways, respectively, the timing of the majority of bifurcations in the phylogeny differed significantly from the dates of vicariance events suggested in the literature. Moreover, several divergence events that resulted in the same distribution patterns of lineages at different positions in the phylogeny did not occur contemporaneously. For that reason, they cannot be the result of the same vicariance events, a result that is independent of molecular dating. Interpretations of the cladogenetic events in the seahorse phylogeny based purely on vicariance biogeographic hypotheses are problematic. We conclude that the evolution of the circumglobally distributed seahorse lineage was strongly influenced by founder dispersal, and suggest that this mode of speciation may be particularly important in marine organisms that lack a pelagic dispersal phase and instead disperse by means of rafting.
Teske, Peter R; Hamilton, Healy; Matthee, Conrad A; Barker, Nigel P
2007-01-01
Background The importance of vicariance events on the establishment of phylogeographic patterns in the marine environment is well documented, and generally accepted as an important cause of cladogenesis. Founder dispersal (i.e. long-distance dispersal followed by founder effect speciation) is also frequently invoked as a cause of genetic divergence among lineages, but its role has long been challenged by vicariance biogeographers. Founder dispersal is likely to be common in species that colonize remote habitats by means of rafting (e.g. seahorses), as long-distance dispersal events are likely to be rare and subsequent additional recruitment from the source habitat is unlikely. In the present study, the relative importance of vicariance and founder dispersal as causes of cladogenesis in a circumglobally distributed seahorse lineage was investigated using molecular dating. A phylogeny was reconstructed using sequence data from mitochondrial and nuclear markers, and the well-documented closure of the Central American seaway was used as a primary calibration point to test whether other bifurcations in the phylogeny could also have been the result of vicariance events. The feasibility of three other vicariance events was explored: a) the closure of the Indonesian Seaway, resulting in sister lineages associated with the Indian Ocean and West Pacific, respectively; b) the closure of the Tethyan Seaway, resulting in sister lineages associated with the Indo-Pacific and Atlantic Ocean, respectively, and c) continental break-up during the Mesozoic followed by spreading of the Atlantic Ocean, resulting in pairs of lineages with amphi-Atlantic distribution patterns. Results Comparisons of pairwise genetic distances among the seahorse species hypothesized to have diverged as a result of the closure of the Central American Seaway with those of published teleost sequences having the same distribution patterns show that the seahorses were among the last to diverge. This suggests that their cladogenesis was associated with the final closure of this seaway. Although two other divergence events in the phylogeny could potentially have arisen as a result of the closures of the Indonesian and Tethyan seaways, respectively, the timing of the majority of bifurcations in the phylogeny differed significantly from the dates of vicariance events suggested in the literature. Moreover, several divergence events that resulted in the same distribution patterns of lineages at different positions in the phylogeny did not occur contemporaneously. For that reason, they cannot be the result of the same vicariance events, a result that is independent of molecular dating. Conclusion Interpretations of the cladogenetic events in the seahorse phylogeny based purely on vicariance biogeographic hypotheses are problematic. We conclude that the evolution of the circumglobally distributed seahorse lineage was strongly influenced by founder dispersal, and suggest that this mode of speciation may be particularly important in marine organisms that lack a pelagic dispersal phase and instead disperse by means of rafting. PMID:17697373
Palatal botulinum toxin as a novel therapy for objective tinnitus in forced eyelid closure syndrome.
Kaffenberger, Thomas M; Mandal, Rajarsi; Schaitkin, Barry M; Hirsch, Barry E
2017-05-01
Objective tinnitus associated with eyelid closure is a rare clinical entity with only a few reported cases. This association previously was identified as forced eyelid closure syndrome (FECS) and involves an aberrant neural reflex between cranial nerve VII (activating the orbicularis oculi muscle) and cranial nerve V (activating the tensor tympani muscle). We present a 52-year-old Caucasian female with a 2-month history of FECS who was successfully treated with intrapalatal botulinum toxin, with full resolution of her objective tinnitus symptoms. This is the first reported use of botulinum toxin in FECS. Laryngoscope, 127:1199-1201, 2017. © 2016 The American Laryngological, Rhinological and Otological Society, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews and Dawn Peterson
2011-09-01
Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less
Preliminary results of laser tissue welding in extravesical reimplantation of the ureters.
Kirsch, A J; Dean, G E; Oz, M C; Libutti, S K; Treat, M R; Nowygrod, R; Hensle, T W
1994-02-01
One exciting potential use of laparoscopic technology is the extravesical reimplantation of the ureters. We have assessed the efficacy of laser-activated fibrinogen solder to close vesical muscle flaps over submucosal ureters (Lich-Gregoir technique) in a canine model. Four dogs were subjected to unilateral flap closures via a protein solder (indocyanine green and fibrinogen) applied to the bladder serosa and exposed to 808 nm. continuous wave diode laser energy. Contralateral reimplantation was performed using 4-zero vicryl muscle flap closures (controls). At 7, 14 and 28 days postoperatively, intravenous pyelograms confirmed bilateral ureteral patency. At intravesical pressures above 100 cm. H2O, there was no evidence of wound disruption in either group. Nondisrupted wound closures were sectioned and strained until ultimate breakage to determine tensile strength. At each study interval the laser-welded closures withstood greater stress than the controls. Although these data represent single tissue samples and are not amenable to statistical analysis, laser-welded closures appeared to be stronger at each study interval. In conclusion, laser-welded vesical wound closures appear at least as strong as suture closures in the canine model.
Yanagisawa, Yukio; Matsuo, Yoshimi; Shuntoh, Hisato; Horiuchi, Noriaki
2014-01-01
[Purpose] The purpose of this study was to elucidate the effect of expiratory resistive loading on orbicularis oris muscle activity. [Subjects] Subjects were 23 healthy individuals (11 males, mean age 25.5±4.3 years; 12 females, mean age 25.0±3.0 years). [Methods] Surface electromyography was performed to measure the activity of the orbicularis oris muscle during maximum lip closure and resistive loading at different expiratory pressures. Measurement was performed at 10%, 30%, 50%, and 100% of maximum expiratory pressure (MEP) for all subjects. The t-test was used to compare muscle activity between maximum lip closure and 100% MEP, and analysis of variance followed by multiple comparisons was used to compare the muscle activities observed at different expiratory pressures. [Results] No significant difference in muscle activity was observed between maximum lip closure and 100% MEP. Analysis of variance with multiple comparisons revealed significant differences among the different expiratory pressures. [Conclusion] Orbicularis oris muscle activity increased with increasing expiratory resistive loading. PMID:24648644
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document /Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 482 U15a/e Muckpiles and Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 482 is comprised of three Corrective Action Sites (CASs) and one adjacent area: CAS 15-06-01, U15e Muckpile; CAS 15-06-02, U15a Muckpile; CAS 15-38-01, Area 15 U15a/e Ponds; and Drainage below the U15a Muckpile. The purpose of thismore » CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further corrective action, by placing use restrictions on the three CASs and the adjacent area of CAU 482. To support this recommendation, a corrective action investigation (CAI) was performed in September 2002. The purpose of the CAI was to fulfill the following data needs as defined during the Data Quality Objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to determine appropriate corrective actions. The CAU 482 dataset from the CAI was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Tier 2 FALS were determined for the hazardous constituents of total petroleum hydrocarbons (TPH)-diesel-range organics (DRO) and the radionuclides americium (Am)-241, cesium (Cs)-137, plutonium (Pu)-238, and Pu-239. The Tier 2 FALs were calculated for the radionuclides using site-specific information. The hazardous constituents of TPH-DRO were compared to the PALs defined in the CAIP, and because none of the preliminary action levels (PALs) were exceeded, the PALs became the FALs. The radionuclide FALs were calculated using the Residual Radioactive (RESRAD) code (version 6.21). The RESRAD calculation determined the activities of all radionuclides that together would sum to an exposure dose of 25 millirem per year to a site receptor (based on their relative abundances at each CAS). Based on the field investigation, the following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) CAS 15-06-01 - None. (2) CAS 15-06-02 - Cs-137 and Pu-239. (3) CAS 15-38-01 - Am-241, Cs-137, Pu-238, and Pu-239. (4) Drainage below CAS 15-06-02 - Cs-137 and Pu-239. Based on the data and risk evaluations, the DQO data needs presented in the Corrective Action Investigation Plan were met, and the data accurately represent the radiological and chemical risk present at CAU 482. Based on the results of the CAI data evaluation, it was determined that closure in place with use restrictions is the appropriate corrective action for CAU 482 and that use restrictions will effectively control exposure to future land users. This is based on the fact that even though the FALs were exceeded in a few samples, this remote, controlled access site poses only limited risk overall to public health and the environment. Given the relatively low levels of contamination present, it would create a greater hazard to worker safety, public health, and the environment to remove the contamination, transport it, and bury it at another location. Therefore, DTRA provides the following recommendations: (1) Close COCs in place at CAS 15-06-02, CAS 15-38-01, and the drainage below CAS 15-06-02 with use restrictions. (2) No further action for CAU 482. (3) A Notice of Completion be issued to DTRA by the Nevada Division of Environmental Protection for closure of CAU 482. (4) Move CAU 482 from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Klintö, Kristina; Svensson, Henry; Elander, Anna; Lohmander, Anette
2014-05-01
Objective : To describe and compare speech and phonology at age 3 years in children born with unilateral complete cleft lip and palate treated with three different methods for primary palatal surgery. Design : Prospective study. Setting : Primary care university hospitals. Participants : Twenty-eight Swedish-speaking children born with nonsyndromic unilateral complete cleft lip and palate. Interventions : Three methods for primary palatal surgery: two-stage closure with soft palate closure between 3.4 and 6.4 months and hard palate closure at mean age 12.3 months (n = 9) or 36.2 months (n = 9) or one-stage closure at mean age 13.6 months (n = 10). Main Outcome Measures : Based on independent judgments performed by two speech-language pathologists from standardized video recordings: percent correct consonants adjusted for age, percent active cleft speech characteristics, total number of phonological processes, number of different phonological processes, hypernasality, and audible nasal air leakage. The hard palate was unrepaired in nine of the children treated with two-stage closure. Results : The group treated with one-stage closure showed significantly better results than the group with an unoperated hard palate regarding percent active cleft speech characteristics and total number of phonological processes. Conclusions : Early primary palatal surgery in one or two stages did not result in any significant differences in speech production at age 3 years. However, children with an unoperated hard palate had significantly poorer speech and phonology than peers who had been treated with one-stage palatal closure at about 13 months of age.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuor, N. R.; Schubert, A. L.
2002-02-26
Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
COVER: A user's guide to the CANOPY and SHRUBS extension of the Stand Prognosis Model
Melinda Moeur
1985-01-01
The COVER model predicts vertical and horizontal tree canopy closure, tree foliage biomass, and the probability of occurrence, height, and cover of shrubs in forest stands. This paper documents use of the COVER program, an adjunct to the Stand Prognosis Model. Preparation of input, interpretation of output, program control, model characteristics, and example...
ERIC Educational Resources Information Center
Delp, Cynthia D.
2015-01-01
The purpose of the study was to document and examine the experiences and perspectives of students and staff who were affected by the closure of Mount Rogers Combined School in 2010. Mount Rogers Combined School was established in Grayson County, Virginia, by the concerted efforts of volunteers and community members who valued education and…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... effective 12:01 a.m., local time on July 1, 2012, until 12:01 a.m., local time on January 1, 2013. ADDRESSES: Electronic copies of documents supporting the final temporary rule implementing gray triggerfish management... . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf is managed under the Fishery Management Plan for...
Each year, millions of Americans visit beaches for recreation, resulting in significant social welfare benefits and economic activity. Considering the high use of coastal beaches for recreation, closures due to bacterial contamination have the potential to greatly impact coastal ...
THE U.S. EPA'S VISION FOR A BEACH FORECASTING TOOL
Beach closures due to water quality that exceeds standard limits occur frequently in the United States. These beach closures deprive the public of opportunities for recreational activities and can have a significant impact on local economics. Because of the large number of mari...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Limited access atrial septal defect closure and the evolution of minimally invasive surgery.
Izzat, M B; Yim, A P; El-Zufari, M H
1998-04-01
While minimizing the "invasiveness" in general surgery has been equated with minimizing "access", what constitutes minimally invasive intra-cardiac surgery remains controversial. Many surgeons doubt the benefits of minimizing access when the need for cardiopulmonary bypass cannot be waived. Recognizing that median sternotomy itself does entail significant morbidity, we investigated the value of alternative approaches to median sternotomy using atrial septal defect closure as our investigative model. We believe that some, but not all minimal access approaches are associated with reduced postoperative morbidity and enhanced recovery. Our current strategy is to use a mini-sternotomy approach in adult patients, whereas conventional median sternotomy remains our standard approach in the pediatric population. Considerable clinical experiences coupled with documented clinical benefits are fundamental before a certain approach is adopted in routine practice.
Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less
Analysis of Mining-induced Valley Closure Movements
NASA Astrophysics Data System (ADS)
Zhang, C.; Mitra, R.; Oh, J.; Hebblewhite, B.
2016-05-01
Valley closure movements have been observed for decades in Australia and overseas when underground mining occurred beneath or in close proximity to valleys and other forms of irregular topographies. Valley closure is defined as the inward movements of the valley sides towards the valley centreline. Due to the complexity of the local geology and the interplay between several geological, topographical and mining factors, the underlying mechanisms that actually cause this behaviour are not completely understood. A comprehensive programme of numerical modelling investigations has been carried out to further evaluate and quantify the influence of a number of these mining and geological factors and their inter-relationships. The factors investigated in this paper include longwall positional factors, horizontal stress, panel width, depth of cover and geological structures around the valley. It is found that mining in a series passing beneath the valley dramatically increases valley closure, and mining parallel to valley induces much more closure than other mining orientations. The redistribution of horizontal stress and influence of mining activity have also been recognised as important factors promoting valley closure, and the effect of geological structure around the valley is found to be relatively small. This paper provides further insight into both the valley closure mechanisms and how these mechanisms should be considered in valley closure prediction models.
Software Measurement Guidebook Version 01.00.00
1991-06-01
However, if PTR closures fall off in the presence of declining PTR openings, then the closure procedure is just catching up with the volume of PTRs, and...the activities in the development process in the WBS. The development activi- ties’ cost accounts should tier up to the CSCI total development cost...34* Establish separate WBS cost accounts for each CSCI. Establish separate CSCI-specific cost accounts for each development activity or phase that tier up
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel, Joe; Tabor, Charles; Survochak, Scott
2013-05-01
The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is locatedmore » in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, D.E.
1996-09-01
This report provides a collection of annotated bibliographies for documents prepared under the Hanford High-Level Waste Vitrification (Plant) Program. The bibliographies are for documents from Fiscal Year 1983 through Fiscal Year 1995, and include work conducted at or under the direction of the Pacific Northwest National Laboratory. The bibliographies included focus on the technology developed over the specified time period for vitrifying Hanford pretreated high-level waste. The following subject areas are included: General Documentation; Program Documentation; High-Level Waste Characterization; Glass Formulation and Characterization; Feed Preparation; Radioactive Feed Preparation and Glass Properties Testing; Full-Scale Feed Preparation Testing; Equipment Materials Testing; Meltermore » Performance Assessment and Evaluations; Liquid-Fed Ceramic Melter; Cold Crucible Melter; Stirred Melter; High-Temperature Melter; Melter Off-Gas Treatment; Vitrification Waste Treatment; Process, Product Control and Modeling; Analytical; and Canister Closure, Decontamination, and Handling« less
Baharestani, Mona Mylene
2007-06-01
The clinical effectiveness of negative pressure wound therapy for the management of acute and chronic wounds is well documented in the adult population but information regarding its use in the pediatric population is limited. A retrospective, descriptive study was conducted to examine the clinical outcomes of using negative pressure wound therapy in the treatment of pediatric wounds. The medical records of 24 consecutive pediatric patients receiving negative pressure wound therapy were reviewed. Demographic data, wound etiology, time to closure, closure method, duration of negative pressure wound therapy, complications, dressing change frequency, dressing type used, and pressure settings were analyzed. All categorical variables in the dataset were summarized using frequency (count and percentages) and all continuous variables were summarized using median (minimum, maximum). The 24 pediatric patients (mean age 8.5 years [range 14 days to 18 years old]) had 24 wounds - 12 (50%) were infected at baseline. Sixteen patients had hypoalbuminemia and six had exposed hardware and bone in their wounds. Twenty-two wounds reached full closure in a median time of 10 days (range 2 to 45) following negative pressure wound therapy and flap closure (11), split-thickness skin graft (three), secondary (four), and primary (four) closure. Pressures used in this population ranged from 50 to 125 mm Hg and most wounds were covered with reticulated polyurethane foam. One patient developed a fistula during the course of negative pressure wound therapy. When coupled with appropriate systemic antibiotics, surgical debridement, and medical and nutritional optimization, in this population negative pressure wound therapy resulted in rapid granulation tissue and 92% successful wound closure. Future neonatal and pediatric negative pressure wound therapy usage registries and prospective studies are needed to provide a strong evidence base from which treatment decisions can be made in the management of these challenging cases, especially pertaining to the safety and efficacy of pressure settings, dressings, and interposing contact layer selection.
Prevalence of Pressure Ulcer and Nutritional Factors Affecting Wound Closure Success in Thailand.
Auiwattanakul, Supakrit; Ungpinitpong, Winai; Yutthakasemsunt, Surakrant; Buranapin, Supawan; Chittawatanarat, Kaweesak
2017-09-01
The authors aimed to estimate the prevalence of pressure ulcers and to explore the nutritional effects of the prognostic factors on successful pressure ulcer closure in a public tertiary care hospital in Thailand. The study was a retrospective cohort analysis of seven-year census (2008 - 2014) at Surin hospital in Thailand. There were 424 of total 240,826 patients aged over than 15 years admitted to surgery, orthopedics and medicine wards during the study period with documented pressure ulcers (ICD 10TM). We analyzed four hundred and ten patients after excluding 14 patients with non-pressure ulcers (due to burning/ diabetic/ ischemic neuropathic ulcers, and less than 24 hours of admission) and loss medical record. We selected independent factors from demographic data, nutritional factors, pressure ulcer characteristics, and management data. The outcome of interest was successful pressure ulcer closure. The analysis method was the semi-parametric Cox regression model and reported as Hazard Ratios (HR) with 95% confidence interval (95% CI). The total hospital admission was 240,826 patients between 2008 - 2014. 410 patients were developing pressure ulcers, of these, 7% (28/410) success in ulcer closure, and 77% (314/410) failure in closure requiring for additional procedures (excisional debridement). The rest of patients (16%, 68/410) was non-operative care. The prevalence of pressure ulcers was 1.7 per 1,000 person-year. The multivariable model found that only the Nottingham Hospital Screening Tool (NS) score was a statistically significant nutritional variable, and additional subgroup analysis of two models of sepsis and spinal cord co-morbidities was also significant. Adjusted hazard ratios (HR) for NS score = 0.355 (95% CI: 0.187, 0.674), p=0.002), for sepsis = 0.312 (95% CI: 0.140, 0.695), p=0.004), and for spinal cord co-morbidity = 0.420 (95% CI: 0.184, 0.958), p=0.039). The annual prevalence was 1.7 per 1,000 persons. NS score was strongly associated with ulcer closure success.
Patil, Mangaladevi S; Jayaraman, Mahesh V; Ahn, Sun H
2017-06-01
To determine the safety and effectiveness of vascular closure devices in prevention of access site complications in acute stroke patient receiving intravenous (IV) and/or intra-arterial (IA) IV tissue plasminogen activator (tPA). All patients with acute stroke onset treated with IV and/or IA tPA closed with vascular closure device and adult age (>18 years) were identified from an academic tertiary medical center and a teaching community hospital stroke database for 9 years (from March 2005 to June 2014). A total of 69 patients were included in the study. The mean age was 68.86±16.70 years and 49.2% female. All accesses were under fluoroscopic guidance into the right common femoral artery. We observed a 5.8% complication rate in patients receiving IV and/or IA tPA closed with vascular closure device. Access site complications included 3 cases of hematoma and 1 case of residual oozing. One patient required transfusion due to access site hematoma. Three patients were on aspirin and heparin and 1 was on no prior anticoagulation. Vascular closure device access site hemorrhagic complication rate in those receiving IV and/or IA tPA is low and similar to reported rates in those not receiving thrombolytic therapy. Vascular closure device use in patients receiving thrombolytic therapy is safe and effectively achieves hemostasis. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Technical Reports Server (NTRS)
Tremor, John W.; Macelroy, Robert D.
1987-01-01
A meeting on the potential contributions of plant science to the goals of Controlled Ecological Life Support System (CELSS) research produced discussions that helped to focus on a variety of topics. In the area of volatiles and soluble organics, microbial activity, disease, and productivity, participants emphasized the need to know more about the consequences of closure for the growth of plants. Under nutrient delivery systems, the problems focus on the need to maintain a stable, optimum nutrient system. Lighting systems discussions emphasized unique methods of direct lighting and development of improved irradiation sources. Flight experiment opportunities were outlined by one speaker. Documentation of the Plant Growth Module was discussed. The last day's discussion focused on the organization of the research group to be involved in the development and use of a two to three cubic meter sealed chamber and ancillary equipment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Hutchison, Gary R; Brown, David M; Hibbs, Leon R; Heal, Mathew R; Donaldson, Ken; Maynard, Robert L; Monaghan, Michelle; Nicholl, Andy; Stone, Vicki
2005-01-01
Background In the year 2000 Corus closed its steel plant operations in Redcar, NE of England temporarily for refurbishment of its blast furnace. This study investigates the impact of the closure on the chemical composition and biological activity of PM10 collected in the vicinity of the steel plant. Methods The metal content of PM10 samples collected before during and after the closure was measured by ICP-MS in order to ascertain whether there was any significant alteration in PM10 composition during the steel plant closure. Biological activity was assessed by instillation of 24 hr PM10 samples into male Wistar rats for 18 hr (n = 6). Inflammation was identified by the cellular and biochemical profile of the bronchoalveolar lavage fluid. Metal chelation of PM10 samples was conducted using Chelex beads prior to treatment of macrophage cell line, J774, in vitro and assessment of pro-inflammatory cytokine expression. Results The total metal content of PM10 collected before and during the closure period were similar, but on reopening of the steel plant there was a significant 3-fold increase (p < 0.05) compared with the closure and pre-closure samples. Wind direction prior to the closure was predominantly from the north, compared to south westerly during the closure and re-opened periods. Of metals analysed, iron was most abundant in the total and acid extract, while zinc was the most prevalent metal in the water-soluble fraction. Elevated markers of inflammation included a significant increase (p < 0.01) in neutrophil cell numbers in the bronchoalveolar lavage of rats instilled with PM10 collected during the reopened period, as well as significant increases in albumin (p < 0.05). Extracts of PM10 from the pre-closure and closure periods did not induce any significant alterations in inflammation or lung damage. The soluble and insoluble extractable PM10 components washed from the reopened period both induced a significant increase in neutrophil cell number (p < 0.05) when compared to the control, and these increases when added together approximately equalled the inflammation induced by the whole sample. PM10 from the re-opened period stimulated J774 macrophages to generate TNF-α protein and this was significantly prevented by chelating the metal content of the PM10 prior to addition to the cells. Conclusion PM10-induced inflammation in the rat lung was related to the concentration of metals in the PM10 samples tested, and activity was found in both the soluble and insoluble fractions of the particulate pollutant. PMID:15904485
40 CFR 265.112 - Closure plan; amendment of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...
10 CFR 61.27 - Application for renewal or closure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...
10 CFR 61.27 - Application for renewal or closure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...
10 CFR 61.27 - Application for renewal or closure.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...
10 CFR 61.27 - Application for renewal or closure.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...
10 CFR 61.27 - Application for renewal or closure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...
Dornelles, Laura Vargas; Corso, Andréa Lúcia; Silveira, Rita de Cássia; Procianoy, Renato Soibelmann
2016-01-01
To compare the efficacy of intravenous ibuprofen at high (20-10-10mg/kg/dose) and low doses (10-5-5mg/kg/dose) the closure of patent ductus arteriosus in preterm newborns. A cohort study with historical control of newborns that received high- and low-dose intravenous ibuprofen, from 2010 to 2013 in a neonatal intensive care unit, for closure of the patent ductus arteriosus, documented by echocardiography. Secondary outcomes included the number of ibuprofen cycles, incidence of bronchopulmonary dysplasia, necrotizing enterocolitis, changes in renal function, and death. Seventy-seven patients received three doses of ibuprofen for the treatment of patent ductus arteriosus, with 33 receiving high-dose and 44 low-dose therapy. The ductus closed after the first cycle in 25 (56.8%) low-dose patients and in 17 (51.5%) high-dose patients (p>0.99). Sixteen patients received a second cycle of ibuprofen, and the ductus closed in 50% after low-dose and in 60% after high-dose therapy (p>0.99). Seven patients required surgery for ductus closure, 13.6% in the low-dose group and 3% in the high-dose group (p=0.22). Thirty-nine patients developed bronchopulmonary dysplasia, 50% in the low-dose group and 51.5% in the high-dose group (p>0.99). Twenty-two (50%) low-dose patients died vs. 15 (45.5%) high-dose patients (p=0.86). There was no difference in closure of the ductus arteriosus or occurrence of adverse effects between the two dose regimens. Copyright © 2016 Sociedade Brasileira de Pediatria. Published by Elsevier Editora Ltda. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mattlin, E.; Charboneau, S.; Johnston, G.
2007-07-01
The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less
Environmental Impact Statement for Proposed Closure of Eaker Air Force Base, Arkansas
1990-05-01
alluvial floodplain of the Mississippi River . Quaternary deposits composed of clay, sandy clay, sand , and gravel occur to a depth of approximately 125...Protection Agency 1988 Bossier Parish , Louisiana : Mississippi County, Arkansas: Pulaski County, Arkansas: and Taylor County. Texas Air Quality Inventory...receiving bases: Malmstrom AFB, Montana; Barksdale AFB, Louisiana ; and Plattsburgh AFB, New York. Additional documents may be prepared 3 when the
Tank waste remediation system nuclear criticality safety program management review
DOE Office of Scientific and Technical Information (OSTI.GOV)
BRADY RAAP, M.C.
1999-06-24
This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL,more » Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium, beryllium, total petroleum hydrocarbons; and total Resource Conservation and Recovery Act metals. Field activities will consist of geophysical and radiological surveys, and collecting soil samples at biased locations by appropriate methods. A two-step data quality objective strategy will be followed: (1) define the nature of contamination at each CAS location by identifying any contamination above preliminary action levels (PALs); and, (2) determine the extent of contamination identified above PALs. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Biological constraints do not entail cognitive closure.
Vlerick, Michael
2014-12-01
From the premise that our biology imposes cognitive constraints on our epistemic activities, a series of prominent authors--most notably Fodor, Chomsky and McGinn--have argued that we are cognitively closed to certain aspects and properties of the world. Cognitive constraints, they argue, entail cognitive closure. I argue that this is not the case. More precisely, I detect two unwarranted conflations at the core of arguments deriving closure from constraints. The first is a conflation of what I will refer to as 'representation' and 'object of representation'. The second confuses the cognitive scope of the assisted mind for that of the unassisted mind. Cognitive closure, I conclude, cannot be established from pointing out the (uncontroversial) existence of cognitive constraints. Copyright © 2014 Elsevier Ltd. All rights reserved.
Land use-based landscape planning and restoration in mine closure areas.
Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke
2011-05-01
Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.
Yuan, Jun; Lau, Eric H.Y.; Li, Kuibiao; Leung, Y.H. Connie; Yang, Zhicong; Xie, Caojun; Liu, Yufei; Liu, Yanhui; Ma, Xiaowei; Liu, Jianping; Li, Xiaoquan; Chen, Kuncai; Luo, Lei; Di, Biao; Cowling, Benjamin J.; Leung, Gabriel M.; Peiris, Malik
2015-01-01
We assessed the effect of closing live poultry markets in China on influenza A(H7N9) virus detection and viability. Intensive sampling was carried out before, during, and after a 2-week citywide market closure; the markets were cleaned and disinfected at the beginning of the closure period. Swab samples were collected at different sites within the markets and tested for H7N9 by real-time reverse transcription PCR and culture. During the closure, H7N9 viral RNA detection and isolation rates in retail markets decreased by 79% (95% CI 64%–88%) and 92% (95% CI 58%–98%), respectively. However, viable H7N9 virus could be cultured from wastewater samples collected up to 2 days after the market closure began. Our findings indicates that poultry workers and the general population are constantly exposed to H7N9 virus at these markets and that market closure and disinfection rapidly reduces the amount of viable virus. PMID:26402310
Columbus Closure Project Released without Radiological Restrictions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henderson, G.
2007-07-01
The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Hallén, Jonas; Atar, Dan; Serebruany, Victor
2014-01-01
FX06 is a naturally occurring fibrin-derived peptide demonstrated to confer cytoprotection in the setting of primary percutaneous coronary intervention. Because the effect of FX06 on human platelet, coagulation, and fibrinolysis biomarkers (PCFB) is unknown but is important for further clinical development, we evaluated how FX06 affects PCFB. The in vitro effects of the whole-blood pre-incubation with escalating concentrations of FX06 (4, 25, and 75 μg/mL) were assessed in aspirin-naïve healthy volunteers (n = 10), those with multiple risk factors for vascular disease (n = 10), and patients with documented coronary artery disease (n = 10). The last two groups were treated with aspirin (81 mg/daily). Thirty-two variables of PCFB were measured with the vehicle and for each chosen FX06 dose. Pretreatment of blood samples with FX06 resulted in a moderate but significant and mostly dose-dependent increases of platelet aggregation induced by adenosine diphosphate and collagen. Similarly, the closure time was reduced, suggesting share-induced activation, PECAM-1, GP Ib, GP IIb/IIIa activity, and vitronectin receptors, which were also up-regulated. In contrast, P-selectin and GPIIb antigen expression were reduced after FX06. All other PCFB were predominantly unaffected by FX06, with the exception of the increased plasminogen, decreased protein C activity, and activated von Willebrand factor. We conclude that in the therapeutic range, FX06 in vitro mildly affects hemostasis by way of mostly activating platelets. Applying moderate concomitant antiplatelet strategies should be considered for the adequate protection from vascular thrombotic events in patients treated with FX06. Similar ex vivo study in patients receiving aspirin and clopidogrel is warranted.
NASA Astrophysics Data System (ADS)
Edwards, Brian J.
2002-05-01
Given the premise that a set of dynamical equations must possess a definite, underlying mathematical structure to ensure local and global thermodynamic stability, as has been well documented, several different models for describing liquid crystalline dynamics are examined with respect to said structure. These models, each derived during the past several years using a specific closure approximation for the fourth moment of the distribution function in Doi's rigid rod theory, are all shown to be inconsistent with this basic mathematical structure. The source of this inconsistency lies in Doi's expressions for the extra stress tensor and temporal evolution of the order parameter, which are rederived herein using a transformation that allows for internal compatibility with the underlying mathematical structure that is present on the distribution function level of description.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1998-06-01
This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less
DOT National Transportation Integrated Search
2003-02-01
In a study sponsored by the Federal Highway Administration (FHWA), researchers conducted a survey of 789 work zones posted on 13 state road closure and construction websites during a two-week snapshot of the peak summer roadwork season in 2001. The g...
23 CFR 630.1108 - Work zone safety management measures and strategies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...
23 CFR 630.1108 - Work zone safety management measures and strategies.
Code of Federal Regulations, 2012 CFR
2012-04-01
... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...
23 CFR 630.1108 - Work zone safety management measures and strategies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...
23 CFR 630.1108 - Work zone safety management measures and strategies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...
Montesinos, M Carmen; Desai-Merchant, Avani; Cronstein, Bruce N
2015-12-01
Impaired wound healing, as it occurs in diabetes mellitus or long-term corticoid treatment, is commonly associated with disability, diminished quality of life, and high economic costs. Selective agonists of the A2A receptor subtype of adenosine, an endogenous regulator of inflammation, promote tissue repair in animal models, both healthy and with impaired healing. Plasmin-mediated proteolysis of fibrin and other matrix proteins is essential for cell migration at sites of injury. Since adenosine A2A receptor activation increases plasminogen activator release from macrophages and mast cells, we studied the effect of a selective agonist, CGS-21680, on full-thickness excisional wound closure in wild-type, urokinase plasminogen activator (uPA)-deficient, and tissue plasminogen activator (tPA)-deficient mice. Wound closure was impaired in tPA- and uPA-deficient mice as compared with wild-type mice, and topical application of CGS-21680 significantly increased the rate at which wounds closed in wild-type mice and uPA-deficient mice, but not in tPA-deficient mice. Immunostaining of tissue sections showed that tPA was present in endothelial cells and histiocytes by day 3 post-wound and also by day 6. In contrast, uPA was more prominent in these cell types only by day 6 post-wound. Our results confirm that plasminogen activation contributes to wound repair and are consistent with the hypothesis that adenosine A2A receptor activation promotes wound closure by a mechanism that depends upon tPA, but not uPA. Moreover, our results suggest that topical adenosine A2A receptor agonists may be useful in promotion of wound closure in patients with impaired wound healing.
PED/PEA-15 Controls Fibroblast Motility and Wound Closure by ERK1/2-Dependent Mechanisms
Buonomo, Roberta; Giacco, Ferdinando; Vasaturo, Angela; Caserta, Sergio; Guido, Stefano; Pagliara, Valentina; Garbi, Corrado; Mansueto, Gelsomina; Cassese, Angela; Perruolo, Giuseppe; Oriente, Francesco; Miele, Claudia; Beguinot, Francesco; Formisano, Pietro
2012-01-01
Cell migration is dependent on the control of signaling events that play significant roles in creating contractile force and in contributing to wound closure. We evaluated wound closure in fibroblasts from mice overexpressing (TgPED) or lacking ped/pea-15 (KO), a gene overexpressed in patients with type 2 diabetes. Cultured skin fibroblasts isolated from TgPED mice showed a significant reduction in the ability to recolonize wounded area during scratch assay, compared to control fibroblasts. This difference was observed both in the absence and in the presence of mytomicin C, an inhibitor of mitosis. In time-lapse experiments, TgPED fibroblasts displayed about twofold lower velocity and diffusion coefficient, as compared to controls. These changes were accompanied by reduced spreading and decreased formation of stress fibers and focal adhesion plaques. At the molecular level, TgPED fibroblasts displayed decreased RhoA activation and increased abundance of phosphorylated extracellular signal-regulated kinase 1/2 (ERK1/2). Inhibition of ERK1/2 activity by PD98059 restored RhoA activation, cytoskeleton organization and cell motility, and almost completely rescued wound closure of TgPED fibroblasts. Interestingly, skin fibroblasts isolated from KO mice displayed an increased wound closure ability. In vivo, healing of dorsal wounds was delayed in TgPED and accelerated in KO mice. Thus, PED/PEA-15 may affect fibroblast motility by a mechanism, at least in part, mediated by ERK1/2. J. Cell. Physiol. 227: 2106–2116, 2012. © 2011 Wiley Periodicals, Inc. PMID:21780113
Su, Y C; Maurel-Zaffran, C; Treisman, J E; Skolnik, E Y
2000-07-01
We have previously shown that the Ste20 kinase encoded by misshapen (msn) functions upstream of the c-Jun N-terminal kinase (JNK) mitogen-activated protein kinase module in Drosophila. msn is required to activate the Drosophila JNK, Basket (Bsk), to promote dorsal closure of the embryo. A mammalian homolog of Msn, Nck interacting kinase, interacts with the SH3 domains of the SH2-SH3 adapter protein Nck. We now show that Msn likewise interacts with Dreadlocks (Dock), the Drosophila homolog of Nck. dock is required for the correct targeting of photoreceptor axons. We have performed a structure-function analysis of Msn in vivo in Drosophila in order to elucidate the mechanism whereby Msn regulates JNK and to determine whether msn, like dock, is required for the correct targeting of photoreceptor axons. We show that Msn requires both a functional kinase and a C-terminal regulatory domain to activate JNK in vivo in Drosophila. A mutation in a PXXP motif on Msn that prevents it from binding to the SH3 domains of Dock does not affect its ability to rescue the dorsal closure defect in msn embryos, suggesting that Dock is not an upstream regulator of msn in dorsal closure. Larvae with only this mutated form of Msn show a marked disruption in photoreceptor axon targeting, implicating an SH3 domain protein in this process; however, an activated form of Msn is not sufficient to rescue the dock mutant phenotype. Mosaic analysis reveals that msn expression is required in photoreceptors in order for their axons to project correctly. The data presented here genetically link msn to two distinct biological events, dorsal closure and photoreceptor axon pathfinding, and thus provide the first evidence that Ste20 kinases of the germinal center kinase family play a role in axonal pathfinding. The ability of Msn to interact with distinct classes of adapter molecules in dorsal closure and photoreceptor axon pathfinding may provide the flexibility that allows it to link to distinct upstream signaling systems.
Su, Yi-Chi; Maurel-Zaffran, Corinne; Treisman, Jessica E.; Skolnik, Edward Y.
2000-01-01
We have previously shown that the Ste20 kinase encoded by misshapen (msn) functions upstream of the c-Jun N-terminal kinase (JNK) mitogen-activated protein kinase module in Drosophila. msn is required to activate the Drosophila JNK, Basket (Bsk), to promote dorsal closure of the embryo. A mammalian homolog of Msn, Nck interacting kinase, interacts with the SH3 domains of the SH2-SH3 adapter protein Nck. We now show that Msn likewise interacts with Dreadlocks (Dock), the Drosophila homolog of Nck. dock is required for the correct targeting of photoreceptor axons. We have performed a structure-function analysis of Msn in vivo in Drosophila in order to elucidate the mechanism whereby Msn regulates JNK and to determine whether msn, like dock, is required for the correct targeting of photoreceptor axons. We show that Msn requires both a functional kinase and a C-terminal regulatory domain to activate JNK in vivo in Drosophila. A mutation in a PXXP motif on Msn that prevents it from binding to the SH3 domains of Dock does not affect its ability to rescue the dorsal closure defect in msn embryos, suggesting that Dock is not an upstream regulator of msn in dorsal closure. Larvae with only this mutated form of Msn show a marked disruption in photoreceptor axon targeting, implicating an SH3 domain protein in this process; however, an activated form of Msn is not sufficient to rescue the dock mutant phenotype. Mosaic analysis reveals that msn expression is required in photoreceptors in order for their axons to project correctly. The data presented here genetically link msn to two distinct biological events, dorsal closure and photoreceptor axon pathfinding, and thus provide the first evidence that Ste20 kinases of the germinal center kinase family play a role in axonal pathfinding. The ability of Msn to interact with distinct classes of adapter molecules in dorsal closure and photoreceptor axon pathfinding may provide the flexibility that allows it to link to distinct upstream signaling systems. PMID:10848599
Variation in stop consonant voicing in two regional varieties of American English
Jacewicz, Ewa; Fox, Robert Allen; Lyle, Samantha
2010-01-01
This study is an acoustic investigation of the nature and extent of consonant voicing of the stop /b/ in two dialectal varieties of American English spoken in south-central Wisconsin and western North Carolina. The stop /b/ occurred at the juncture of two words such as small bids, in a position between two voiced sonorants, i.e. the liquid /l/ and a vowel. Twenty women participated, ten representing the Wisconsin and ten the North Carolina variety, respectively. Significant dialectal differences were found in the voicing patterns. The Wisconsin stop closures were usually not fully voiced and terminated in a complete silence followed by a closure release whereas North Carolina speakers produced mostly fully voiced closures. Further dialectal differences included the proportion of closure voicing as a function of word emphasis. For Wisconsin speakers, the proportion of closure voicing was smallest when the word was emphasized and it was greatest in non-emphatic positions. For North Carolina speakers, the degree of word emphasis did not have an effect on the proportion of closure voicing. The results suggest different mechanisms by which closure voicing is maintained in these two dialects, pointing to active articulatory maneuvers in North Carolina speakers and passive in Wisconsin speakers. PMID:20198112
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Empirical constraints on closure temperatures from a single diffusion coefficient
NASA Astrophysics Data System (ADS)
Lee, J. K. W.
The elucidation of thermal histories by geochronological and isotopic means is based fundamentally on solid-state diffusion and the concept of closure temperatures. Because diffusion is thermally activated, an analytical solution of the closure temperature (Tc*) can only be obtained if the diffusion coefficient D of the diffusion process is measured at two or more different temperatures. If the diffusion coefficient is known at only one temperature, however, the true closure temperature (Tc*) cannot be calculated analytically because there exist an infinite number of possible (apparent) closure temperatures (Tc) which can be generated by this single datum. By introducing further empirical constraints to limit the range of possible closure temperatures, however, mathematical analysis of a modified form of the closure temperature equation shows that it is possible to make both qualitative and quantitative estimates of Tc* given knowledge of only one diffusion coefficient DM measured at one temperature TM. Qualitative constraints of the true closure temperature Tc* are obtained from the shapes of curves on a graph of the apparent Tc (Tc) vs. activation energy E, in which each curve is based on a single diffusion coefficient measurement DM at temperature TM. Using a realistic range of E, the concavity of the curve shows whether TM is less than, approximately equal to, or greater than Tc*. Quantitative estimates are obtained by considering two dimensionless parameters [
Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2004-04-01
This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
Weber, Alexander E.; Batko, Brian; Nho, Shane J.; Stegemann, Catherine
2017-01-01
Hip preservation surgery has become more common over the past decade and is now a preferred treatment modality for an increasingly diverse array of pathology in the young, active patient with hip pain. In particular, hip arthroscopy has become an increasingly popular treatment choice for active patients diagnosed with femoroacetabular impingement (FAI). Appropriate postoperative rehabilitation is critical for overall patient success and optimal long-term outcome. As surgical techniques continue to evolve, rehabilitation protocols must adapt to accommodate changes in the surgical procedure and ultimately provide the safest and fastest recovery of function for the patient. One such surgical modification has been the incorporation of routine capsular closure as part of the treatment of FAI in the young, active patient. The purpose of this clinical commentary is to present a four-phase rehabilitation protocol for returning to sport following arthroscopic correction of FAI with routine capsular closure. Level of Evidence 5 PMID:28900574
Separating Active and Passive Influences on Stomatal Control of Transpiration[OPEN
McAdam, Scott A.M.; Brodribb, Timothy J.
2014-01-01
Motivated by studies suggesting that the stomata of ferns and lycophytes do not conform to the standard active abscisic acid (ABA) -mediated stomatal control model, we examined stomatal behavior in a conifer species (Metasequoia glyptostroboides) that is phylogenetically midway between the fern and angiosperm clades. Similar to ferns, daytime stomatal closure in response to moderate water stress seemed to be a passive hydraulic process in M. glyptostroboides immediately alleviated by rehydrating excised shoots. Only after prolonged exposure to more extreme water stress did active ABA-mediated stomatal closure become important, because foliar ABA production was triggered after leaf turgor loss. The influence of foliar ABA on stomatal conductance and stomatal aperture was highly predictable and additive with the passive hydraulic influence. M. glyptostroboides thus occupies a stomatal behavior type intermediate between the passively controlled ferns and the characteristic ABA-dependent stomatal closure described in angiosperm herbs. These results highlight the importance of considering phylogeny as a major determinant of stomatal behavior. PMID:24488969
Separating active and passive influences on stomatal control of transpiration.
McAdam, Scott A M; Brodribb, Timothy J
2014-04-01
Motivated by studies suggesting that the stomata of ferns and lycophytes do not conform to the standard active abscisic acid (ABA) -mediated stomatal control model, we examined stomatal behavior in a conifer species (Metasequoia glyptostroboides) that is phylogenetically midway between the fern and angiosperm clades. Similar to ferns, daytime stomatal closure in response to moderate water stress seemed to be a passive hydraulic process in M. glyptostroboides immediately alleviated by rehydrating excised shoots. Only after prolonged exposure to more extreme water stress did active ABA-mediated stomatal closure become important, because foliar ABA production was triggered after leaf turgor loss. The influence of foliar ABA on stomatal conductance and stomatal aperture was highly predictable and additive with the passive hydraulic influence. M. glyptostroboides thus occupies a stomatal behavior type intermediate between the passively controlled ferns and the characteristic ABA-dependent stomatal closure described in angiosperm herbs. These results highlight the importance of considering phylogeny as a major determinant of stomatal behavior.
Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment
Ribeiro, Gerson Luiz Ulema; Jacob, Helder B.
2016-01-01
ABSTRACT Introduction: Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. Objective: This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts. PMID:27275623
Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment.
Ribeiro, Gerson Luiz Ulema; Jacob, Helder B
2016-01-01
Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts.
Mechanics of epithelial closure over non-adherent environments
NASA Astrophysics Data System (ADS)
Vedula, Sri Ram Krishna; Peyret, Grégoire; Cheddadi, Ibrahim; Chen, Tianchi; Brugués, Agustí; Hirata, Hiroaki; Lopez-Menendez, Horacio; Toyama, Yusuke; Neves de Almeida, Luís; Trepat, Xavier; Lim, Chwee Teck; Ladoux, Benoit
2015-01-01
The closure of gaps within epithelia is crucial to maintain its integrity during biological processes such as wound healing and gastrulation. Depending on the distribution of extracellular matrix, gap closure occurs through assembly of multicellular actin-based contractile cables or protrusive activity of border cells into the gap. Here we show that the supracellular actomyosin contractility of cells near the gap edge exerts sufficient tension on the surrounding tissue to promote closure of non-adherent gaps. Using traction force microscopy, we observe that cell-generated forces on the substrate at the gap edge first point away from the centre of the gap and then increase in the radial direction pointing into the gap as closure proceeds. Combining with numerical simulations, we show that the increase in force relies less on localized purse-string contractility and more on large-scale remodelling of the suspended tissue around the gap. Our results provide a framework for understanding the assembly and the mechanics of cellular contractility at the tissue level.
Predictors of Premature Match Closure in Youth Mentoring Relationships.
Kupersmidt, Janis B; Stump, Kathryn N; Stelter, Rebecca L; Rhodes, Jean E
2017-03-01
Although mentoring is a popular and effective means of intervention with youth, the positive effects of mentoring can be diminished by premature match closure of relationships. Program, mentor, and mentee characteristics were examined as predictors of premature match closure. Secondary data analyses were conducted on a large national database of mentoring programs consisting of match and youth risk information from 170 mentoring programs and 6468 matches from across the U.S. Premature closure was associated with mentee age at match inception and 19 individual mentee characteristics. The set of mentee characteristics were examined as part of a cumulative risk index encompassing seven conceptually combined categories including family background characteristics, school functioning problems, engagement in risky health behaviors, self-regulation difficulties, engagement in illegal or criminal activities, and internalizing and externalizing behavior problems. Both the age of mentees when matched and the cumulative risk index score significantly predicted premature closure. Results are discussed in terms of directions for future research and suggestions for enhancing mentoring program practices. © Society for Community Research and Action 2017.
Mechanics of epithelial closure over non-adherent environments
Vedula, Sri Ram Krishna; Peyret, Grégoire; Cheddadi, Ibrahim; Chen, Tianchi; Brugués, Agustí; Hirata, Hiroaki; Lopez-Menendez, Horacio; Toyama, Yusuke; Neves de Almeida, Luís; Trepat, Xavier; Lim, Chwee Teck; Ladoux, Benoit
2015-01-01
The closure of gaps within epithelia is crucial to maintain its integrity during biological processes such as wound healing and gastrulation. Depending on the distribution of extracellular matrix, gap closure occurs through assembly of multicellular actin-based contractile cables or protrusive activity of border cells into the gap. Here we show that the supracellular actomyosin contractility of cells near the gap edge exerts sufficient tension on the surrounding tissue to promote closure of non-adherent gaps. Using traction force microscopy, we observe that cell-generated forces on the substrate at the gap edge first point away from the centre of the gap and then increase in the radial direction pointing into the gap as closure proceeds. Combining with numerical simulations, we show that the increase in force relies less on localized purse-string contractility and more on large-scale remodelling of the suspended tissue around the gap. Our results provide a framework for understanding the assembly and the mechanics of cellular contractility at the tissue level. PMID:25608921
Wang, Xiaochen; Ward, Robert E.
2010-01-01
During dorsal closure in Drosophila, signaling events in the dorsalmost row of epidermal cells (DME cells) direct the migration of lateral epidermal sheets towards the dorsal midline where they fuse to enclose the embryo. A Jun amino-terminal kinase (JNK) cascade in the DME cells induces the expression of Decapentaplegic (Dpp). Dpp signaling then regulates the cytoskeleton in the DME cells and amnioserosa to affect the cell shape changes necessary to complete dorsal closure. We identified a mutation in Sec61α that specifically perturbs dorsal closure. Sec61α encodes the main subunit of the translocon complex for co-translational import of proteins into the ER. JNK signaling is normal in Sec61α mutant embryos, but Dpp signaling is attenuated and the DME cells fail to maintain an actinomyosin cable as epithelial migration fails. Consistent with this model, dorsal closure is rescued in Sec61α mutant embryos by an activated form of the Dpp receptor Thick veins. PMID:20112345
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
76 FR 54788 - Notice of Permanent Closure of Public Lands in Clackamas and Multnomah Counties, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
..., State, and local government permittees and contractors conducting authorized activities; members of.... The BLM will post closure signs at main entry points to this area and take steps to install physical barriers at the BRWMU boundary. The affected lands will be represented as closed to public entry in maps...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
..., more or less. The closure and temporary restrictions are necessary to provide a safe environment for... or activities that are necessary to provide a safe environment for the public and for participants in... and protect the environment on public lands, as well as support state and local law enforcement...
ERIC Educational Resources Information Center
Ong, Lay See; Leung, Angela K.-Y.
2013-01-01
Drawing on the integrative system theory of creativity combining the person, process, and press perspectives, this research offers the first evidence of how high-need-for-cognitive-closure (NFC) individuals' creative mind can be opened up, by making them become more cognizant of uncreative ideas as consensually invalid solutions to creative…
Eye-closure-triggered paroxysmal activity and cognitive impairment: a case report.
Termine, Cristiano; Rubboli, Guido; Veggiotti, Pierangelo
2006-01-01
To study the neuropsychological status of an epileptic patient presenting with epileptic activity triggered by eye closure in a 14-year follow-up period. The patient was studied at 12 and 26 years of age; during this period he underwent periodical clinical evaluations and EEG investigations; brain magnetic resonance imaging (MRI) was performed at 12 years of age. A neuropsychological assessment was carried out both at 12 years of age (T0) and at 26 years of age. At T0 and T1, neuropsychological tests (digits and words span, graphoestesia, reactions time to auditory stimuli, sentences repetition, words repetition, digital gnosis, backward counting [i.e.,100-0]) were performed during video-EEG monitoring either with eyes closed or with eyes open, to evaluate possible transitory effects related to ongoing epileptic activity. Moreover, at T0 the patient underwent Wechsler Intelligence Scale for Children-Revised, and at T1 to Wechsler Adult Intelligence Scale-Revised. EEG recordings showed continuous epileptic activity triggered by eye closure, disappearing only with eyes opening, both at T0 and T1 (in this latter case, anteriorly predominant). The results of neuropsychological assessment during eyes closed as compared to performances with eyes open did not show significant differences, at T0 as well as at T1. Wechsler Intelligence scales showed a deterioration of performances at T1 with respect to T0; in addition, at T1, attention and short-term memory abnormalities, impairment in facial recognition and block design, and defective results in Continuous Performance Test and Wisconsin Card Sorting Test were observed. Lack of differences between the results of neuropsychological tests performed with eyes closed as compared to the eyes open condition suggests that in our patient epileptic activity did not cause transitory cognitive abnormalities. Deterioration of Wechsler Intelligence Scales in the follow-up period might be interpreted as the result of a disruption of cognitive processes possibly related to the persistence of a continuous epileptic activity during eye closure over the years. We speculate whether a dysfunction in posterior cortical areas involved in visual processing might be related to the impairment in face recognition and block design tests as well to eye closure sensitivity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
BOREAS HYD-3 Tree Measurements
NASA Technical Reports Server (NTRS)
Hardy, Janet P.; Hall, Forrest G. (Editor); Knapp, David E. (Editor); David Robert E.; Smith, David E. (Technical Monitor)
2000-01-01
The BOREAS HYD-3 team collected several data sets related to the hydrology of forested areas. This data set contains measurements of canopy density (closure), stem density, and DBH from a variety of sites. Canopy density measurements were made during the FFC-W and FFC-T 1994 in both the SSA and the NSA. Stem density measurements were made during FFC-W 1996 in the SSA only. Canopy density measurements were made using a forest densiometer, while measurements of stem density and DBH were made using standard techniques. This study was undertaken to predict spatial distributions of energy transfer, snow properties important to the hydrology, remote sensing signatures, and transmissivity of gases through the snow and their relation to forests in boreal ecosystems. The data are available in tabular ASCII files. The data files are available on a CD-ROM (see document number 20010000884) or from the Oak Ridge National Laboratory (ORNL) Distributed Active Archive Center (DAAC).
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
1999-10-01
Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closuremore » report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.« less
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.; Lantow, Tiffany A.
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less
Cheng, Kun-Shan; Liao, Yan-Chiou; Chen, Mu-Yuan; Kuan, Tang-Ching; Hong, Yi-Han; Ko, Li; Hsieh, Wen-Yeh; Wu, Chien-Liang; Chen, Ming-Ren; Lin, Chih-Sheng
2013-01-01
Ventricular septal defect (VSD) is the most common form of congenital heart diseases. Matrix metalloproteinases (MMPs) are a family of zinc-dependent endopeptidases involved in causal cardiac tissue remodeling. We studied the changes of circulating MMP-2 and MMP-9 activities in the patients with VSD severity and closure. There were 96 children with perimembranous VSD enrolled in this study. We assigned the patients into three groups according to the ratio of VSD diameter/diameter of aortic root (Ao). They were classified as below: Trivial (VSD/Ao ratio ≤ 0.2), Small (0.2 < VSD/Ao ≤ 0.3) and Median (0.3 < VSD/Ao) group. Plasma MMP-2 and MMP-9 activities were assayed by gelatin zymography. There was a significant higher MMP-2 activity in the VSD (Trivial, Small and Median) groups compared with that in Control group. The plasma MMP-9 activity showed a similar trend as the findings in MMP-2 activity. After one year follow-up, a significant difference in the MMP-9 activity was found between VSD spontaneous closure and non-closure groups. In conclusion, a positive trend between the severity of VSD and activities of MMP-2 and MMP-9 was found. Our data imply that MMP-2 and MMP-9 activities may play a role in the pathogenesis of VSD. PMID:23847438
Cheng, Kun-Shan; Liao, Yan-Chiou; Chen, Mu-Yuan; Kuan, Tang-Ching; Hong, Yi-Han; Ko, Li; Hsieh, Wen-Yeh; Wu, Chien-Liang; Chen, Ming-Ren; Lin, Chih-Sheng
2013-01-01
Ventricular septal defect (VSD) is the most common form of congenital heart diseases. Matrix metalloproteinases (MMPs) are a family of zinc-dependent endopeptidases involved in causal cardiac tissue remodeling. We studied the changes of circulating MMP-2 and MMP-9 activities in the patients with VSD severity and closure. There were 96 children with perimembranous VSD enrolled in this study. We assigned the patients into three groups according to the ratio of VSD diameter/diameter of aortic root (Ao). They were classified as below: Trivial (VSD/Ao ratio ≤ 0.2), Small (0.2 < VSD/Ao ≤ 0.3) and Median (0.3 < VSD/Ao) group. Plasma MMP-2 and MMP-9 activities were assayed by gelatin zymography. There was a significant higher MMP-2 activity in the VSD (Trivial, Small and Median) groups compared with that in Control group. The plasma MMP-9 activity showed a similar trend as the findings in MMP-2 activity. After one year follow-up, a significant difference in the MMP-9 activity was found between VSD spontaneous closure and non-closure groups. In conclusion, a positive trend between the severity of VSD and activities of MMP-2 and MMP-9 was found. Our data imply that MMP-2 and MMP-9 activities may play a role in the pathogenesis of VSD.
Fong, Keith S K; Hufnagel, Robert B; Khadka, Vedbar S; Corley, Michael J; Maunakea, Alika K; Fogelgren, Ben; Ahmed, Zubair M; Lozanoff, Scott
2016-05-01
Genetic variations affecting neural tube closure along the head result in malformations of the face and brain. Neural tube defects (NTDs) are among the most common birth defects in humans. We previously reported a mouse mutant called tuft that arose spontaneously in our wild-type 3H1 colony. Adult tuft mice present midline craniofacial malformations with or without an anterior cephalocele. In addition, affected embryos presented neural tube closure defects resulting in insufficient closure of the anterior neuropore or exencephaly. Here, through whole-genome sequencing, we identified a nonsense mutation in the Tet1 gene, which encodes a methylcytosine dioxygenase (TET1), co-segregating with the tuft phenotype. This mutation resulted in premature termination that disrupts the catalytic domain that is involved in the demethylation of cytosine. We detected a significant loss of TET enzyme activity in the heads of tuft embryos that were homozygous for the mutation and had NTDs. RNA-Seq transcriptome analysis indicated that multiple gene pathways associated with neural tube closure were dysregulated in tuft embryo heads. Among them, the expressions of Cecr2, Epha7 and Grhl2 were significantly reduced in some embryos presenting neural tube closure defects, whereas one or more components of the non-canonical WNT signaling pathway mediating planar cell polarity and convergent extension were affected in others. We further show that the recombinant mutant TET1 protein was capable of entering the nucleus and affected the expression of endogenous Grhl2 in IMCD-3 (inner medullary collecting duct) cells. These results indicate that TET1 is an epigenetic determinant for regulating genes that are crucial to closure of the anterior neural tube and its mutation has implications to craniofacial development, as presented by the tuft mouse. © 2016. Published by The Company of Biologists Ltd.
Favaloro, Emmanuel J; Thom, Jim; Patterson, David; Just, Sarah; Baccala, Maria; Dixon, Tracy; Meiring, Muriel; Koutts, Jerry; Rowell, John; Baker, Ross
2009-09-01
We performed a retrospective audit of cross-laboratory testing of desmopressin and factor concentrate therapy to assess the potential utility of supplementary testing using the PFA-100 with functional von Willebrand factor (VWF) activity testing. Data were evaluated for a large number of patients with von Willebrand disease of type 1, type 2A or type 2M, as well as a comparative subset of individuals with haemophilia or carriers of haemophilia. Laboratory testing comprised pre and postdesmopressin, or pre and postconcentrate, evaluation of factor VIII, VWF antigen (VWF:Ag) and VWF ristocetin cofactor activity as traditionally performed, supplemented with collagen-binding (VWF:CB) testing and PFA-100 closure times. In brief, both therapies tended to normalize VWF test parameters and closure times in individuals with type 1 von Willebrand disease, with the level of correction in closure times related to the level of normalization of VWF, particularly the VWF:CB. However, although occasional correction of closure times was observed in patients with type 2A or type 2M von Willebrand disease, these did not in general normalize PFA-100 closure times either with desmopressin or factor concentrate therapy. In these patients, improvement in closure times was more likely in those in whom VWF:CB values normalized or when VWF:CB/VWF:Ag ratios normalized. This study confirms that there is a strong relationship between the presenting levels of plasma VWF and PFA-100 closure times, and that the supplementary combination of PFA-100 and VWF:CB testing might provide added clinical utility to current broadly applied testing strategies limited primarily to VWF:Ag, VWF ristocetin cofactor and factor VIII:coagulant. Future prospective investigations are warranted to validate these relationships and to investigate their therapeutic implications.
A subject with abnormally short stature from Imperial Rome.
Ottini, L; Minozzi, S; Pantano, W B; Maucci, C; Gazzaniga, V; Angeletti, L R; Catalano, P; Mariani-Costantini, R
2001-01-01
In spite of the rich iconographic and literary documentation from ancient sources, the skeletal evidence concerning individuals of abnormally short stature in the Greco-Roman world is scarce. The necropolis of Viale della Serenissima/Via Basiliano in Rome, mostly referable to the II century AD, recently yielded the skeleton of an individual characterized by proportionate short stature, gracile features suggesting female gender, and delayed epiphysial closure, associated with full maturation of the permanent dentition. These characteristics could be compatible with the phenotype associated with female gonadal dysgenesis. The skeletal individual described here, although poorly preserved, represents the first evidence of a paleopathologic condition affecting skeletal growth documented for the population of ancient Rome.
Rodríguez Sánchez de la Blanca, Ana; Sánchez Luna, M; González Pacheco, N; Arriaga Redondo, M; Navarro Patiño, N
2018-02-01
Closure of a patent ductus arteriosus (PDA) in preterm infants modifies cardiac output and induces adaptive changes in the hemodynamic situation. The present study aims to analyze those changes, through a non-invasive cardiac output monitor based on blood electrical velocimetry, in preterm babies. A prospective observational study of preterm infants with a gestational age of less than 28 weeks, and a hemodynamic significant PDA, requires intravenous ibuprofen or surgical closure. All patients were monitored with electrical velocimetry before treatment and through the following 72 h. Two groups were defined, ibuprofen and surgical closure. Variations of cardiac output were analyzed from the basal situation and at 1, 8, 24, 48, and 72 h on each group. During a 12-month period, 18 patients were studied. The median gestational age in the ibuprofen group (12/18) was 26 +5 weeks (25 +5 -27 +3 ) with a median birth weight of 875 (670-1010) g. The cardiac output index (CI) value was 0.29 l/kg/min (0.24-0.34). Among the patients with confirmed ductus closure (50%), a significant CI decrease was shown (0.24 vs 0.29 l/kg/min; P 0.03) after 72 h (three ibuprofen doses). A statistically significant decrease in systolic volume (SVI) was found: 1.62 vs 1.88 ml/kg, P 0.03 with a decrease in contractility (ICON), 85 vs 140, P 0.02. The gestational age in the surgical group (6/18) was 25 +2 weeks (24-26 +3 ) with a median weight of 745 (660-820) g. All patients in this group showed a decrease in the immediate postoperative CI (1 h after surgery) 0.24 vs 0.30 l/kg/min, P 0.05, and a significant decrease in contractility (ICON 77 vs 147, P 0.03). In addition, a no statistically significant decrease in SVI (1.54 vs 1.83 ml/kg, P 0.06), as well as an increase in systemic vascular resistance (10,615 vs 8797 dyn/cm 2 , P 0.08), were detected. This deterioration was transient without significant differences in the remaining periods of time evaluated. The surgical closure of the PDA in preterm infants causes a transient deterioration of cardiac function linked to a documented decrease in the left ventricular output. The hemodynamic changes detected after pharmacological PDA closure are similar but those patients present a better clinical tolerance to changes in the cardiac output. What is Known: • Surgical ductus closure generates acute hemodynamic changes in cardiac output and left ventricular function. What is New: • The hemodynamic changes detected after pharmacological ductus closure are similar to those found in the surgical closure. Electrical velocimetry can detect those changes.
Impact of High Seas Closure on Food Security in Low Income Fish Dependent Countries
Teh, Louise S. L.; Lam, Vicky W. Y.; Cheung, William W. L.; Miller, Dana; Teh, Lydia C. L.; Sumaila, U. Rashid
2016-01-01
We investigate how high seas closure will affect the availability of commonly consumed food fish in 46 fish reliant, and/or low income countries. Domestic consumption of straddling fish species (fish that would be affected by high seas closure) occurred in 54% of the assessed countries. The majority (70%) of countries were projected to experience net catch gains following high seas closure. However, countries with projected catch gains and that also consumed the straddling fish species domestically made up only 37% of the assessed countries. In contrast, much fewer countries (25%) were projected to incur net losses from high seas closure, and of these, straddling species were used domestically in less than half (45%) of the countries. Our findings suggest that, given the current consumption patterns of straddling species, high seas closure may only directly benefit the supply of domestically consumed food fish in a small number of fish reliant and/or low income countries. In particular, it may not have a substantial impact on improving domestic fish supply in countries with the greatest need for improved access to affordable fish, as only one third of this group used straddling fish species domestically. Also, food security in countries with projected net catch gains but where straddling fish species are not consumed domestically may still benefit indirectly via economic activities arising from the increased availability of non-domestically consumed straddling fish species following high seas closure. Consequently, this study suggests that high seas closure can potentially improve marine resource sustainability as well as contribute to human well-being in some of the poorest and most fish dependent countries worldwide. However, caution is required because high seas closure may also negatively affect fish availability in countries that are already impoverished and fish insecure. PMID:28033359
Impact of High Seas Closure on Food Security in Low Income Fish Dependent Countries.
Teh, Louise S L; Lam, Vicky W Y; Cheung, William W L; Miller, Dana; Teh, Lydia C L; Sumaila, U Rashid
2016-01-01
We investigate how high seas closure will affect the availability of commonly consumed food fish in 46 fish reliant, and/or low income countries. Domestic consumption of straddling fish species (fish that would be affected by high seas closure) occurred in 54% of the assessed countries. The majority (70%) of countries were projected to experience net catch gains following high seas closure. However, countries with projected catch gains and that also consumed the straddling fish species domestically made up only 37% of the assessed countries. In contrast, much fewer countries (25%) were projected to incur net losses from high seas closure, and of these, straddling species were used domestically in less than half (45%) of the countries. Our findings suggest that, given the current consumption patterns of straddling species, high seas closure may only directly benefit the supply of domestically consumed food fish in a small number of fish reliant and/or low income countries. In particular, it may not have a substantial impact on improving domestic fish supply in countries with the greatest need for improved access to affordable fish, as only one third of this group used straddling fish species domestically. Also, food security in countries with projected net catch gains but where straddling fish species are not consumed domestically may still benefit indirectly via economic activities arising from the increased availability of non-domestically consumed straddling fish species following high seas closure. Consequently, this study suggests that high seas closure can potentially improve marine resource sustainability as well as contribute to human well-being in some of the poorest and most fish dependent countries worldwide. However, caution is required because high seas closure may also negatively affect fish availability in countries that are already impoverished and fish insecure.
Wagstaff, Graham F; Wheatcroft, Jacqueline M; Caddick, Andrea M; Kirby, Lara J; Lamont, Elizabeth
2011-04-01
Due to several well-documented problems, hypnosis as a forensic interviewing tool has been largely replaced by the cognitive interview; however, the latter is problematic in time and complexity. This article builds on previous research showing that some procedures used in traditional hypnotic forensic interviewing might still be useful in developing alternative procedures for use in investigative interviewing. Two experiments are described that include a focused meditation with eye-closure technique with similarities to conventional hypnotic induction but without the label of hypnosis. In the first, focused meditation was comparable to a context reinstatement, or revivification, technique in facilitating memory in children aged 6 to 7 without increasing errors or inflating confidence. In the second, when used in combination with context reinstatement, focused meditation was resistant to the effects of misleading information in adults. Implications are discussed.
L-Area STS MTR/NRU/NRX Grapple Assembly Closure Mechanics Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huizenga, D. J.
2016-06-08
A review of the closure mechanics associated with the Shielded Transfer System (STS) MTR/NRU/NRX grapple assembly utilized at the Savannah River Site (SRS) was performed. This review was prompted by an operational event which occurred at the Canadian Nuclear Laboratories (CNL) utilizing a DTS-XL grapple assembly which is essentially identical to the STS MTR/NRU/NRX grapple assembly used at the SRS. The CNL operational event occurred when a NRU/NRX fuel basket containing spent nuclear fuel assemblies was inadvertently released by the DTS-XL grapple assembly during a transfer. The SM review of the STS MTR/NRU/NRX grapple assembly will examine the operational aspectsmore » of the STS and the engineered features of the STS which prevent such an event at the SRS. The design requirements for the STS NRU/NRX modifications and the overall layout of the STS are provided in other documents.« less
Batista E Silva, Martinho Braga
2016-06-01
The aim of this study is to understand recent transformations in penitentiary health care management in Brazil, during the implementation of the National Policy for Comprehensive Health Care for People Deprived of Liberty in the Prison System, and the closure of the National Sector for Penitentiary Health Care. The scientific problem investigated is the language of penitentiary health care policy. The theoretical-methodological framework adopted is Pierre Bourdieu's genetic structuralism. In this manner, we carry out an analysis of documents and public statements in search of State categories and classifications. We note the consolidation of a state classification that separates the 'penitentiary' domain from the 'prison' domain, as well as the creation of the State category of 'person deprived of liberty in the prison system'. Penitentiary health care management constitutes itself as a question of primary care.
Uchida, Mitsuo; Kaneko, Minoru; Kawa, Shigeyuki
2014-10-21
To investigate how household background factors affect parental behavior during pandemic influenza-related school closures, we determined associations between such factors and three parental attitudes: "caring for the child", "taking leave from work", and "permitting out-of-home activities". A hypothetical pandemic influenza situation was presented and a questionnaire survey among households of 2146 schoolchildren from 6 schools was conducted. Odds ratios of background factors were estimated using univariate and multivariate logistic regression models. Responses pertaining to 1510 children indicated that junior high school (OR = 0.11), both parents working (OR = 0.03), and family including grandparent(s) or other relatives (OR = 7.50) were factors associated with "caring for the child", and elementary school (OR = 2.28), special education school (OR = 3.18), and both parents working (OR = 5.74) were associated with "taking leave from work". Having an older sibling (OR = 0.74) and awareness of the technical term for school closure (OR = 0.73) were factors associated with "permitting out-of-home activities". Not only work status but also other household factors may be associated with parental behaviors during pandemic influenza-related school closures.
WASTE PACKAGE REMEDIATION SYSTEM DESCRIPTION DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
N.D. Sudan
2000-06-22
The Waste Package Remediation System remediates waste packages (WPs) and disposal containers (DCs) in one of two ways: preparation of rejected DC closure welds for repair or opening of the DC/WP. DCs are brought to the Waste Package Remediation System for preparation of rejected closure welds if testing of the closure weld by the Disposal Container Handling System indicates an unacceptable, but repairable, welding flaw. DC preparation of rejected closure welds will require removal of the weld in such a way that the Disposal Container Handling System may resume and complete the closure welding process. DCs/WPs are brought to themore » Waste Package Remediation System for opening if the Disposal Container Handling System testing of the DC closure weld indicates an unrepairable welding flaw, or if a WP is recovered from the subsurface repository because suspected damage to the WP or failure of the WP has occurred. DC/WP opening will require cutting of the DC/WP such that a temporary seal may be installed and the waste inside the DC/WP removed by another system. The system operates in a Waste Package Remediation System hot cell located in the Waste Handling Building that has direct access to the Disposal Container Handling System. One DC/WP at a time can be handled in the hot cell. The DC/WP arrives on a transfer cart, is positioned within the cell for system operations, and exits the cell without being removed from the cart. The system includes a wide variety of remotely operated components including a manipulator with hoist and/or jib crane, viewing systems, machine tools for opening WPs, and equipment used to perform pressure and gas composition sampling. Remotely operated equipment is designed to facilitate DC/WP decontamination and hot cell equipment maintenance, and interchangeable components are provided where appropriate. The Waste Package Remediation System interfaces with the Disposal Container Handling System for the receipt and transport of WPs and DCs. The Waste Handling Building System houses the system, and provides the facility, safety, and auxiliary systems required to support operations. The system receives power from the Waste Handling Building Electrical System. The system also interfaces with the various DC systems.« less
Gravity affects the closure of the traps in Dionaea muscipula.
Pandolfi, Camilla; Masi, Elisa; Voigt, Boris; Mugnai, Sergio; Volkmann, Dieter; Mancuso, Stefano
2014-01-01
Venus flytrap (Dionaea muscipula Ellis) is a carnivorous plant known for its ability to capture insects thanks to the fast snapping of its traps. This fast movement has been long studied and it is triggered by the mechanical stimulation of hairs, located in the middle of the leaves. Here we present detailed experiments on the effect of microgravity on trap closure recorded for the first time during a parabolic flight campaign. Our results suggest that gravity has an impact on trap responsiveness and on the kinetics of trap closure. The possible role of the alterations of membrane permeability induced by microgravity on trap movement is discussed. Finally we show how the Venus flytrap could be an easy and effective model plant to perform studies on ion channels and aquaporin activities, as well as on electrical activity in vivo on board of parabolic flights and large diameter centrifuges.
Loope, Walter L.; Loope, Henry M.; Goble, Ronald J.; Fisher, Timothy G.; Lytle, David E.; Legg, Robert J.; Wysocki, Douglas A.; Hanson, Paul R.; Young, Aaron R.
2012-01-01
Current models of landscape response to Holocene climate change in midcontinent North America largely reconcile Earth orbital and atmospheric climate forcing with pollen-based forest histories on the east and eolian chronologies in Great Plains grasslands on the west. However, thousands of sand dunes spread across 12,000 km2 in eastern upper Michigan (EUM), more than 500 km east of the present forest-prairie ecotone, present a challenge to such models. We use 65 optically stimulated luminescence (OSL) ages on quartz sand deposited in silt caps (n = 8) and dunes (n = 57) to document eolian activity in EUM. Dune building was widespread ca. 10–8 ka, indicating a sharp, sustained decline in forest cover during that period. This decline was roughly coincident with hydrologic closure of the upper Great Lakes, but temporally inconsistent with most pollen-based models that imply canopy closure throughout the Holocene. Early Holocene forest openings are rarely recognized in pollen sums from EUM because faint signatures of non-arboreal pollen are largely obscured by abundant and highly mobile pine pollen. Early Holocene spikes in nonarboreal pollen are recorded in cores from small ponds, but suggest only a modest extent of forest openings. OSL dating of dune emplacement provides a direct, spatially explicit archive of greatly diminished forest cover during a very dry climate in eastern midcontinent North America ca. 10–8 ka.
RELAP-7 Progress Report. FY-2015 Optimization Activities Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berry, Ray Alden; Zou, Ling; Andrs, David
2015-09-01
This report summarily documents the optimization activities on RELAP-7 for FY-2015. It includes the migration from the analytical stiffened gas equation of state for both the vapor and liquid phases to accurate and efficient property evaluations for both equilibrium and metastable (nonequilibrium) states using the Spline-Based Table Look-up (SBTL) method with the IAPWS-95 properties for steam and water. It also includes the initiation of realistic closure models based, where appropriate, on the U.S. Nuclear Regulatory Commission’s TRACE code. It also describes an improved entropy viscosity numerical stabilization method for the nonequilibrium two-phase flow model of RELAP-7. For ease of presentationmore » to the reader, the nonequilibrium two-phase flow model used in RELAP-7 is briefly presented, though for detailed explanation the reader is referred to RELAP-7 Theory Manual [R.A. Berry, J.W. Peterson, H. Zhang, R.C. Martineau, H. Zhao, L. Zou, D. Andrs, “RELAP-7 Theory Manual,” Idaho National Laboratory INL/EXT-14-31366(rev. 1), February 2014].« less
STAR-CCM+ Verification and Validation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pointer, William David
2016-09-30
The commercial Computational Fluid Dynamics (CFD) code STAR-CCM+ provides general purpose finite volume method solutions for fluid dynamics and energy transport. This document defines plans for verification and validation (V&V) of the base code and models implemented within the code by the Consortium for Advanced Simulation of Light water reactors (CASL). The software quality assurance activities described herein are port of the overall software life cycle defined in the CASL Software Quality Assurance (SQA) Plan [Sieger, 2015]. STAR-CCM+ serves as the principal foundation for development of an advanced predictive multi-phase boiling simulation capability within CASL. The CASL Thermal Hydraulics Methodsmore » (THM) team develops advanced closure models required to describe the subgrid-resolution behavior of secondary fluids or fluid phases in multiphase boiling flows within the Eulerian-Eulerian framework of the code. These include wall heat partitioning models that describe the formation of vapor on the surface and the forces the define bubble/droplet dynamic motion. The CASL models are implemented as user coding or field functions within the general framework of the code. This report defines procedures and requirements for V&V of the multi-phase CFD capability developed by CASL THM. Results of V&V evaluations will be documented in a separate STAR-CCM+ V&V assessment report. This report is expected to be a living document and will be updated as additional validation cases are identified and adopted as part of the CASL THM V&V suite.« less
Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Joung, In Suk; Luchko, Tyler; Case, David A.
2013-01-01
Using the dielectrically consistent reference interaction site model (DRISM) of molecular solvation, we have calculated structural and thermodynamic information of alkali-halide salts in aqueous solution, as a function of salt concentration. The impact of varying the closure relation used with DRISM is investigated using the partial series expansion of order-n (PSE-n) family of closures, which includes the commonly used hypernetted-chain equation (HNC) and Kovalenko-Hirata closures. Results are compared to explicit molecular dynamics (MD) simulations, using the same force fields, and to experiment. The mean activity coefficients of ions predicted by DRISM agree well with experimental values at concentrations below 0.5 m, especially when using the HNC closure. As individual ion activities (and the corresponding solvation free energies) are not known from experiment, only DRISM and MD results are directly compared and found to have reasonably good agreement. The activity of water directly estimated from DRISM is nearly consistent with values derived from the DRISM ion activities and the Gibbs-Duhem equation, but the changes in the computed pressure as a function of salt concentration dominate these comparisons. Good agreement with experiment is obtained if these pressure changes are ignored. Radial distribution functions of NaCl solution at three concentrations were compared between DRISM and MD simulations. DRISM shows comparable water distribution around the cation, but water structures around the anion deviate from the MD results; this may also be related to the high pressure of the system. Despite some problems, DRISM-PSE-n is an effective tool for investigating thermodynamic properties of simple electrolytes. PMID:23387564
Merlot, Sylvain; Leonhardt, Nathalie; Fenzi, Francesca; Valon, Christiane; Costa, Miguel; Piette, Laurie; Vavasseur, Alain; Genty, Bernard; Boivin, Karine; Müller, Axel; Giraudat, Jérôme; Leung, Jeffrey
2007-07-11
Light activates proton (H(+))-ATPases in guard cells, to drive hyperpolarization of the plasma membrane to initiate stomatal opening, allowing diffusion of ambient CO(2) to photosynthetic tissues. Light to darkness transition, high CO(2) levels and the stress hormone abscisic acid (ABA) promote stomatal closing. The overall H(+)-ATPase activity is diminished by ABA treatments, but the significance of this phenomenon in relationship to stomatal closure is still debated. We report two dominant mutations in the OPEN STOMATA2 (OST2) locus of Arabidopsis that completely abolish stomatal response to ABA, but importantly, to a much lesser extent the responses to CO(2) and darkness. The OST2 gene encodes the major plasma membrane H(+)-ATPase AHA1, and both mutations cause constitutive activity of this pump, leading to necrotic lesions. H(+)-ATPases have been traditionally assumed to be general endpoints of all signaling pathways affecting membrane polarization and transport. Our results provide evidence that AHA1 is a distinct component of an ABA-directed signaling pathway, and that dynamic downregulation of this pump during drought is an essential step in membrane depolarization to initiate stomatal closure.
3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2011-09-01
The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less
Fuentes, Liza; Lebenkoff, Sharon; White, Kari; Gerdts, Caitlin; Hopkins, Kristine; Potter, Joseph E; Grossman, Daniel
2016-04-01
In 2013, Texas passed legislation restricting abortion services. Almost half of the state's clinics had closed by April 2014, and there was a 13% decline in abortions in the 6 months after the first portions of the law went into effect, compared to the same period 1 year prior. We aimed to describe women's experiences seeking abortion care shortly after clinics closed and document pregnancy outcomes of women affected by these closures. Between November 2013 and November 2014, we recruited women who sought abortion care at Texas clinics that were no longer providing services. Some participants had appointments scheduled at clinics that stopped offering care when the law went into effect; others called seeking care at clinics that had closed. Texas resident women seeking abortion in Albuquerque, New Mexico, were also recruited. We conducted 23 in-depth interviews and performed a thematic analysis. As a result of clinic closures, women experienced confusion about where to go for abortion services, and most reported increased cost and travel time to obtain care. Having to travel farther for care also compromised their privacy. Eight women were delayed more than 1 week, two did not receive care until they were more than 12 weeks pregnant and two did not obtain their desired abortion at all. Five women considered self-inducing the abortion, but none attempted this. The clinic closures resulted in multiple barriers to care, leading to delayed abortion care for some and preventing others from having the abortion they wanted. The restrictions on abortion facilities that resulted in the closure of clinics in Texas created significant burdens on women that prevented them from having desired abortions. These laws may also adversely affect public health by moving women who would have had abortions in the first trimester to having second-trimester procedures. Copyright © 2016 Elsevier Inc. All rights reserved.
Lee, Guen-Ho; Bae, Seong-Cheon; Jin, Sang-Gyun; Park, Kyoung-Ho; Yeo, Sang-Won; Park, Shi-Nae
2012-09-01
Forceful eyelid closure syndrome (FECS) was first reported at the Proceedings of the Second International Tinnitus Seminar in 1983. The main symptom of this syndrome is a spontaneous muscular tinnitus related only to forced eye closure, specifically the voluntary contraction of the periorbital muscles. Although investigation of the syndrome was initiated >100 years ago, only four cases have been published in the past 20 years. We report six cases of middle ear myoclonus tinnitus diagnosed as FECS in children and discuss issues surrounding the diagnosis and treatment of this syndrome. Retrospective case series. From 2009 to 2011, six children complaining of clicking or crackling sounds in their ears presented at Seoul St. Mary's Hospital. Endoscopic examination and recording of the tympanic membrane were performed while the patients were asked to close their eyes forcefully. Audiologic studies including acoustic reflex decay and static compliance were performed for documentation of the movement of the tympanic membrane. Triggering factors of FECS in the children were carefully evaluated. Synchronous movement of the tympanic membrane in response to forced eye closure on endoscopic examination was the most reliable finding to diagnose FECS. Acoustic reflex decay and other impedance audiogram findings showed irregular perturbations during forced eye closure, which led to diagnosis of the tinnitus as middle ear myoclonus. Most of the patients had triggering factors for FECS. Reassurance and removal of the triggering or causal factors with or without medication improved clicking sounds coming from middle ear myoclonus. FECS is a rare clinical entity and can be easily missed in routine clinical examination. We suggest that patients, especially children, with clicking or crackling tinnitus should be evaluated for FECS using proper diagnostic tools. A possible mechanism of FECS in children postulated from our case review is suggested. Copyright © 2012 The American Laryngological, Rhinological, and Otological Society, Inc.
Sampling and monitoring for closure
McLemore, V.T.; Russell, C.C.; Smith, K.S.
2004-01-01
The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.
Rudkin, Adam K; Gray, Tim L; Awadalla, Mona; Craig, Jamie E
2010-10-01
We present a case of a 63-year-old woman who presented to an ED with bifrontal headache, nausea and vomiting and reduced visual acuity. Examination revealed bilateral elevated intraocular pressures, corneal haze, shallow anterior chambers and poorly reactive, mid-dilated pupils. Diagnosis was made of simultaneous bilateral acute angle closure glaucoma. A complete drug history revealed that she had been using an over-the-counter cold and flu remedy whose active ingredients included atropa belladonna, an herb with anticholinergic properties. It is likely that drug-induced dilatation of the individual's pupils precipitated this angle closure emergency. In the report we discuss the risk factors for angle closure glaucoma, and review the local and systemic drugs known to trigger this sight-threatening emergency. © 2010 The Authors. Emergency Medicine Australasia © 2010 Australasian College for Emergency Medicine and Australasian Society for Emergency Medicine.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Red Oak Research and Demonstration Area in Phelps Township, North Bay, Ontario-2004 to 2005
Dave Deugo; Andrée Morneault; Dianne Othmer; Megan Smith; Al Stinson; Murray Woods; Ian Kovacs; Ian Aho; Bill Parker; Rob Baker; Marinus Verwey; Guylaine Thauvette; Don Willis; Jeff Dech
2006-01-01
In July 2004, a large stand of red oak (Quercus rubra) was harvested in Phelps Township, North Bay District, North Bay, Ontario using the uniform shelterwood system. Most of the stand was harvested to retain 40 percent crown closure, while a very small portion was harvested to retain 70 percent crown closure. During tree marking, an active Northern...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strachan, C.L.; Raabe, K.L.
1997-12-31
In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less
Base Closure and Realignment Act (BRAC) Cleanup Plan, Sacramento Army Depot, Sacramento, California
1995-10-01
and remedial actions ( RAs ) presented in this document are believed to be accurate and have been reviewed by the regulatory agencies. However, this...of items to be competed, a time-phased schedule, and source selection criteria. The competition will begin as soon as possible. The Communications...allowed to be emitted into the region’s air from all permitted sources . If new sources are sited within these non-attainment areas, they cannot emit more
1991-05-01
February, 1991) Environmental Impact Statement Completion Date Fort Dix Jul 90 (A) Fort Devens - Fort Huachuca On Hold *Presidio of San Francisco May...the signing of the ROD in the NEPA process, documents must be revised, extending the environmental analysis process. As noted in the Fort Belvoir...91 Fort Sheridan Feb 91 (A) Fort Douglas Mar 91 Fort Meade Jul 91 Army Material Technology Laboratory Sep 91 Jefferson Proving Ground Sep 91 Cameron
Fuel Injector: Air swirl characterization aerothermal modeling, phase 2, volume 2
NASA Technical Reports Server (NTRS)
Nikjooy, M.; Mongia, H. C.; Mcdonell, V. G.; Samuelson, G. S.
1993-01-01
A well integrated experimental/analytical investigation was conducted to provide benchmark quality data relevant to prefilming type airblast fuel nozzle and its interaction with combustor dome air swirler. The experimental investigation included a systematic study of both single-phase flows that involved single and twin co-axial jets with and without swirl. A two-component Phase Doppler Particle Analyzer (PDPA) equipment was used to document the interaction of single and co-axial air jets with glass beads that simulate nonevaporating spray and simultaneously avoid the complexities associated with fuel atomization processes and attendant issues about the specification of relevant boundary conditions. The interaction of jets with methanol spray produced by practical airblast nozzle was also documented in the spatial domain of practical interest. Model assessment activities included the use of three turbulence models (k-epsilon, algebraic second moment (ASM) and differential second moment (DSM)) for the carrier phase, deterministic or stochastic Lagrangian treatment of the dispersed phase, and advanced numerical schemes. Although qualitatively good comparison with data was obtained for most of the cases investigated, the model deficiencies in regard to modeled dissipation rate transport equation, single length scale, pressure-strain correlation, and other critical closure issues need to be resolved before one can achieve the degree of accuracy required to analytically design combustion systems.
Fuel injector: Air swirl characterization aerothermal modeling, phase 2, volume 1
NASA Technical Reports Server (NTRS)
Nikjooy, M.; Mongia, H. C.; Mcdonell, V. G.; Samuelsen, G. S.
1993-01-01
A well integrated experimental/analytical investigation was conducted to provide benchmark quality relevant to a prefilming type airblast fuel nozzle and its interaction with the combustor dome air swirler. The experimental investigation included a systematic study of both single-phase flows that involved single and twin co-axial jets with and without swirl. A two-component Phase Doppler Particle Analyzer (PDPA) was used to document the interaction of single and co-axial air jets with glass beads that simulate nonevaporating spray and simultaneously avoid the complexities associated with fuel atomization processes and attendant issues about the specification of relevant boundary conditions. The interaction of jets with methanol spray produced by practical airblast nozzle was also documented in the spatial domain of practical interest. Model assessment activities included the use of three turbulence models (k-epsilon, algebraic second moment (ASM), and differential second moment (DSM)) for the carrier phase, deterministic or stochastic Lagrangian treatment of the dispersed phase, and advanced numerical schemes. Although qualitatively good comparison with data was obtained for most of the cases investigated, the model deficiencies in regard to modeled dissipation rate transport equation, single length scale, pressure-strain correlation, and other critical closure issues need to be resolved before one can achieve the degree of accuracy required to analytically design combustion systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
Götz, Theresa; Hanke, David; Huonker, Ralph; Weiss, Thomas; Klingner, Carsten; Brodoehl, Stefan; Baumbach, Philipp; Witte, Otto W
2017-06-01
We often close our eyes to improve perception. Recent results have shown a decrease of perception thresholds accompanied by an increase in somatosensory activity after eye closure. However, does somatosensory spatial discrimination also benefit from eye closure? We previously showed that spatial discrimination is accompanied by a reduction of somatosensory activity. Using magnetoencephalography, we analyzed the magnitude of primary somatosensory (somatosensory P50m) and primary auditory activity (auditory P50m) during a one-back discrimination task in 21 healthy volunteers. In complete darkness, participants were requested to pay attention to either the somatosensory or auditory stimulation and asked to open or close their eyes every 6.5 min. Somatosensory P50m was reduced during a task requiring the distinguishing of stimulus location changes at the distal phalanges of different fingers. The somatosensory P50m was further reduced and detection performance was higher during eyes open. A similar reduction was found for the auditory P50m during a task requiring the distinguishing of changing tones. The function of eye closure is more than controlling visual input. It might be advantageous for perception because it is an effective way to reduce interference from other modalities, but disadvantageous for spatial discrimination because it requires at least one top-down processing stage. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less
Eye closure in darkness animates olfactory and gustatory cortical areas.
Wiesmann, M; Kopietz, R; Albrecht, J; Linn, J; Reime, U; Kara, E; Pollatos, O; Sakar, V; Anzinger, A; Fesl, G; Brückmann, H; Kobal, G; Stephan, T
2006-08-01
In two previous fMRI studies, it was reported that eyes-open and eyes-closed conditions in darkness had differential effects on brain activity, and typical patterns of cortical activity were identified. Without external stimulation, ocular motor and attentional systems were activated when the eyes were open. On the contrary, the visual, somatosensory, vestibular, and auditory systems were activated when the eyes were closed. In this study, we investigated whether cortical areas related to the olfactory and gustatory system are also animated by eye closure without any other external stimulation. In a first fMRI experiment (n = 22), we identified cortical areas including the piriform cortex activated by olfactory stimulation. In a second experiment (n = 12) subjects lying in darkness in the MRI scanner alternately opened and closed their eyes. In accordance to previous studies, we found activation clusters bilaterally in visual, somatosensory, vestibular and auditory cortical areas for the contrast eyes-closed vs. eyes-open. In addition, we were able to show that cortical areas related to the olfactory and gustatory system were also animated by eye closure. These results support the hypothesis that there are two different states of mental activity: with the eyes closed, an "interoceptive" state characterized by imagination and multisensory activity and with the eyes open, an "exteroceptive" state characterized by attention and ocular motor activity. Our study also suggests that the chosen baseline condition may have a considerable impact on activation patterns and on the interpretation of brain activation studies. This needs to be considered for studies of the olfactory and gustatory system.
Malthusian overfishing and efforts to overcome it on Kenyan coral reefs.
McClanahan, Tim R; Hicks, Christina C; Darling, Emily S
2008-09-01
This study examined trends along a gradient of fishing intensity in an artisanal coral reef fishery over a 10-year period along 75 km of Kenya's most populated coastline. As predicted by Malthusian scenarios, catch per unit effort (CPUE), mean trophic level, the functional diversity of fished taxa, and the diversity of gear declined, while total annual catch and catch variability increased along the fishing pressure gradient. The fishery was able to sustain high (approximately 16 Mg x km(-2) x yr(-1)) but variable yields at high fishing pressure due to the dominance of a few productive herbivorous fish species in the catch. The effect of two separate management strategies to overcome this Malthusian pattern was investigated: fisheries area closure and elimination of the dominant and most "competitive" gear. We found that sites within 5 km of the enforced closure showed significantly lower total catch and CPUE, but increased yield stability and trophic level of catch than predicted by regression models normalized for fishing effort. Sites that had excluded illegal beach seine use through active gear management exhibited increased total catch and CPUE. There was a strong interaction between closure and gear management, which indicates that, for closures to be effective at increasing catch, there must be simultaneous efforts at gear management around the periphery of the closures. We propose that Malthusian effects are responsible for the variation in gear and catch and that active management through reduced effort and reductions in the most competitive gear have the greatest potential to increase the functional and trophic diversity and per-person productivity.
Niederauer, Mark Q; Michalek, Joel E; Armstrong, David G
2017-09-01
Over the past generation, preclinical data have suggested that there is a potential physiologic benefit to applying oxygen topically to wounds. However, we are unaware of any studies in the literature that have robustly assessed whether this would lead to a higher proportion of healing in similarly treated people without oxygen. Therefore, the purpose of this study was to assess this in people being treated for chronic diabetic foot ulcers (DFUs). We enrolled and randomized 100 subjects with DFUs (79% male, aged 58.3 ± 12.1 years) to receive either active continuous diffusion of oxygen (CDO) therapy using an active CDO device, or an otherwise fully operational sham device that provided moist wound therapy (MWT) without delivering oxygen. Patients were followed until closure or 12 weeks, whichever was sooner. Patients, treating physicians and independent evaluators were blinded to the study arm. All patients received identical offloading, dressings and follow-up. There were no significant differences in assessed descriptive characteristics between the treatment arms ( P > .05 for all). A significantly higher proportion of people healed in the active arm compared to sham (46% vs 22%, P = .02). This relative effect became greater in more chronic wounds (42.5% vs 13.5%, P = .006). Patients randomized to the active device experienced significantly faster rates of closure relative to the sham ( P < .001). The results of this study suggest that continuously diffused oxygen over a wound leads to significantly higher rates of closure, and faster time to closure, compared to similarly treated patients receiving standard therapy coupled with a sham device. Furthermore, the relative efficacy appears to improve the more the therapy may be needed (more chronic and larger wounds).
Aloe vera: an in vitro study of effects on corneal wound closure and collagenase activity.
Curto, Elizabeth M; Labelle, Amber; Chandler, Heather L
2014-11-01
To evaluate the in vitro effects of an aloe vera solution on (i) the viability and wound healing response of corneal cells and (ii) the ability to alter collagenase and gelatinase activities. Primary cultures of corneal epithelial cells and fibroblasts were prepared from grossly normal enucleated canine globes and treated with an aloe solution (doses ranging from 0.0-2 mg/mL). Cellular viability was evaluated using a colorimetric assay. A corneal wound healing model was used to quantify cellular ingrowth across a defect made on the confluent surface. Anticollagenase and antigelatinase activities were evaluated by incubating a bacterial collagenase/gelatinase with aloe solution (doses ranging from 0.0-500 μg/mL) and comparing outcome measures to a general metalloproteinase inhibitor, 1, 10-phenanthroline, and canine serum (doses ranging from 0.0-100%). None of the concentrations of aloe solution tested significantly affected the viability of corneal epithelial cells or fibroblasts. Concentrations ≤175 μg/mL slightly accelerated corneal epithelial cell wound closure; this change was not significant. Concentrations ≥175 μg/mL significantly (P ≤ 0.001) slowed the rate of corneal fibroblast wound closure, while aloe concentrations <175 μg/mL did not significantly alter fibroblast wound closure. Aloe solution did not alter the ability for collagenase to degrade gelatin or collagen Type I but increased the ability for collagenase to degrade Type IV collagen. Although additional experiments are required, lower concentrations of aloe solution may be beneficial in healing of superficial corneal wounds to help decrease fibrosis and speed epithelialization. An increase in collagenase activity with aloe vera warrants further testing before considering in vivo studies. © 2014 American College of Veterinary Ophthalmologists.
Gibson, Kathleen; Ferris, Brian
2017-04-01
Purpose Cyanoacrylate closure of the great saphenous vein with the VenaSeal™ Closure System is a relatively new modality. Studies have been limited to moderate-sized great saphenous veins and some have mandated postoperative compression stockings. We report the results of a prospective study of cyanoacrylate closure for the treatment of great saphenous vein, small saphenous veins, and/or accessory saphenous veins up to 20 mm in diameter. Methods Fifty subjects with symptomatic great saphenous vein, small saphenous veins, and/or accessory saphenous veins incompetence were each treated at a single session. Compression stockings were not used post-procedure. Subjects returned to clinic at week 1 and again at one month. Post-procedure evaluations were performed at seven days and one month and included numerical pain rating score, revised venous clinical severity score, the Aberdeen Varicose Vein Questionnaire score, and time to return to work and normal activities. Duplex ultrasound was performed at each visit. Findings Procedural pain was mild (numerical pain rating scale 2.2 ± 1.8). All treated veins (48 great saphenous vein, 14 accessory saphenous veins, and 8 small saphenous veins) had complete closure by duplex ultrasound at seven days and one month. Mean time to return to work and normal activities was 0.2 ± 1.1 and 2.4 ± 4.1 days, respectively. The revised venous clinical severity score was improved to 1.8 ± 1.4 ( p < .001) and Aberdeen Varicose Vein Questionnaire score to 8.9 ± 6.6 ( p < .001) at one month. Phlebitis in the treatment area or side branches occurred in 10 subjects (20%) and completely resolved in all but one subject (2%) by one month; 98% of subjects were "completely" or "somewhat" satisfied, and 2% "unsatisfied" with the procedure at one month, despite the protocol disallowance of concomitant side branch treatment. Conclusions Cyanoacrylate closure is safe and effective for the treatment of one or more incompetent saphenous or accessory saphenous veins. Closure rates were high even in the absence of the use of compression stockings or side branch treatment. Time back to work or normal activities was short and improvements in venous severity scores and QOL were significant, comparing favorably with alternative treatment methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feist, E.T.
2012-07-01
Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less
A shape memory polymer concrete crack closure system activated by electrical current
NASA Astrophysics Data System (ADS)
Teall, Oliver; Pilegis, Martins; Davies, Robert; Sweeney, John; Jefferson, Tony; Lark, Robert; Gardner, Diane
2018-07-01
The presence of cracks has a negative impact on the durability of concrete by providing paths for corrosive materials to the embedded steel reinforcement. Cracks in concrete can be closed using shape memory polymers (SMP) which produce a compressive stress across the crack faces. This stress has been previously found to enhance the load recovery associated with autogenous self-healing. This paper details the experiments undertaken to incorporate SMP tendons containing polyethylene terephthalate (PET) filaments into reinforced and unreinforced 500 × 100 × 100 mm structural concrete beam samples. These tendons are activated via an electrical supply using a nickel-chrome resistance wire heating system. The set-up, methodology and results of restrained shrinkage stress and crack closure experiments are explained. Crack closure of up to 85% in unreinforced beams and 26%–39% in reinforced beams is measured using crack-mouth opening displacement, microscope and digital image correlation equipment. Conclusions are made as to the effectiveness of the system and its potential for application within industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less
Correction of MFG-E8 Resolves Inflammation and Promotes Cutaneous Wound Healing in Diabetes.
Das, Amitava; Ghatak, Subhadip; Sinha, Mithun; Chaffee, Scott; Ahmed, Noha S; Parinandi, Narasimham L; Wohleb, Eric S; Sheridan, John F; Sen, Chandan K; Roy, Sashwati
2016-06-15
Milk fat globule epidermal growth factor-factor 8 (MFG-E8) is a peripheral glycoprotein that acts as a bridging molecule between the macrophage and apoptotic cells, thus executing a pivotal role in the scavenging of apoptotic cells from affected tissue. We have previously reported that apoptotic cell clearance activity or efferocytosis is compromised in diabetic wound macrophages. In this work, we test the hypothesis that MFG-E8 helps resolve inflammation, supports angiogenesis, and accelerates wound closure. MFG-E8(-/-) mice displayed impaired efferocytosis associated with exaggerated inflammatory response, poor angiogenesis, and wound closure. Wound macrophage-derived MFG-E8 was recognized as a critical driver of wound angiogenesis. Transplantation of MFG-E8(-/-) bone marrow to MFG-E8(+/+) mice resulted in impaired wound closure and compromised wound vascularization. In contrast, MFG-E8(-/-) mice that received wild-type bone marrow showed improved wound closure and improved wound vascularization. Hyperglycemia and exposure to advanced glycated end products inactivated MFG-E8, recognizing a key mechanism that complicates diabetic wound healing. Diabetic db/db mice suffered from impaired efferocytosis accompanied with persistent inflammation and slow wound closure. Topical recombinant MFG-E8 induced resolution of wound inflammation, improvements in angiogenesis, and acceleration of closure, upholding the potential of MFG-E8-directed therapeutics in diabetic wound care. Copyright © 2016 by The American Association of Immunologists, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Becker, J.L.; Wintsch, R.P.; Kunk, M.J.
1993-03-01
New [sup 40]Ar/[sup 39]Ar age spectra of hornblende and white mica from the Great Falls area of the Potomac terrane of Maryland and Virginia indicate pre-Taconic metamorphism. Age spectra of hornblende samples are interpreted to represent cooling from peak metamorphic conditions through their closure temperatures for argon diffusion ([approximately]500C) at about 490 Ma. These older Ordovician postmetamorphic cooling ages strongly contrast with younger post-Ordovician metamorphic cooling ages now being reported in the Blue Ridge and Goochland terranes to the west and east respectively. A late phyllitic sheen observed on rocks in the field and petrographic observations of undulose plagioclase andmore » amphibole, and older muscovite, and kinked primary muscovite in the Bear Island Granodiorite reflect a younger retrogressive metamorphism involving the growth of secondary muscovite (Fisher's S4 ). [sup 40]Ar/[sup 39]Ar Age spectra of white micas from the Bear Island Granodiorite are complex and probably indicate both primary and secondary white mica, the latter apparently growing below the closure temperature for retention of argon in muscovite ([approximately]350C). The age spectra permit an estimate of a minimum age of 420 Ma for cooling through closure of the older generation of white mica. The above ages of hornblende and muscovite closure imply a minimum cooling rate of [approximately]2C/m.y., and exhumation rate of about 1 mm/yr. The projected time of peak metamorphism at upper amphibolite facies for the Great Falls area clearly predates the Ordovician Taconic orogeny and suggests that these rocks escaped this event and largely escaped younger Paleozoic metamorphic events, which are well documented in adjacent terranes.« less
Clinical and subclinical leaks after low colorectal anastomosis: a clinical and radiologic study.
Lim, Michael; Akhtar, Saleem; Sasapu, Kishore; Harris, Keith; Burke, Dermot; Sagar, Peter; Finan, Paul
2006-10-01
This study was designed to examine the natural history of subclinical leaks and their effect on bowel function and quality of life and to evaluate water-soluble contrast enema features that predict anastomotic healing after leaks. Consecutive patients who underwent low rectal anastomosis were followed up postoperatively for leaks. All leaks were confirmed radiologically with CT scanning and water-soluble contrast enema imaging. Water-soluble contrast enemas were serially repeated to identify healing. Characteristics on initial water-soluble contrast enema were correlated with observed healing. Postoperatively, patients were required to fill in a quality of life and a bowel function questionnaire. A total of 138 patients underwent low rectal anastomosis procedures with a median follow-up period of 26 (interquartile range, 19-37) months. There were 23 documented leaks of which 13 (9 percent) presented clinically and 10 (8 percent) presented subclinically. Ileostomy closure was possible in 4 of 13 (30 percent) patients with a clinical leak and all 10 (100 percent) patients with a subclinical leak. Median quality of life scores were lower for patients with clinical leaks and no ileostomy closure (P = 0.03). Bowel function for subclinical leak patients and clinical leak patients with ileostomy closure were similarly impaired. The presence of a cavity (P = 0.01) and a stricture (P = 0.01) at the anastomotic site were unfavorable radiologic features associated with nonhealing. Subclinical leaks are more benign in their natural history compared with clinical leaks. Quality of life and bowel function is no better in patients with a subclinical leak compared with patients with a clinical leak who have ileostomy closure. Anastomotic leaks may resolve if favorable radiologic features are present.
Boutet, B G; Saunders, A B; Gordon, S G
2017-05-01
The median age at presentation for dogs with patent ductus arteriosus (PDA) is <6 months of age, and closure is associated with a decrease in heart size and increased survival time, which are not well described in older dogs. To describe the clinical characteristics of dogs with PDA ≥5 years of age at the time of presentation to a veterinary referral hospital. 35 client-owned dogs. Retrospective case series. PDA was diagnosed at a median age of 7.4 years (range, 5.1-12.3 years). Females represented 23/35 (65.7%) of the patients. Concurrent heart disease included degenerative mitral valve disease (DMVD; 13), arrhythmias (11), pulmonary hypertension (7), and other congenital defects (2). Cardiomegaly was documented in the majority of dogs consisting of left ventricular enlargement (91%) and left atrial enlargement (86%). Median vertebral heart size in 24 dogs was 12.9 (range, 10.7-18.2). The PDA shunt direction was left-to-right in 33 and bidirectional in 2 dogs. Closure was performed in 26 dogs, including 4 with pulmonary hypertension. In 10 dogs receiving furosemide pre-operatively for management of heart failure, furosemide was discontinued (8) or the dosage decreased (2) at the time of discharge. Adult dogs can present with a left-to-right shunting PDA that results in cardiomegaly and clinical signs that can improve or resolve with PDA closure. This improvement is also apparent in dogs with PDA complicated by DMVD. Pulmonary hypertension that does not result in complete right-to-left shunting should not be considered a contraindication to closure. Copyright © 2017 The Authors. Journal of Veterinary Internal Medicine published by Wiley Periodicals, Inc. on behalf of the American College of Veterinary Internal Medicine.
Death of the Talking Heads: Participatory Workshops for Curricular Reform.
ERIC Educational Resources Information Center
McNeal, Ann P.
1998-01-01
Describes active learning activities that can be useful in college faculty development workshops, including three activity types: introductory exercises (personal introductions, goal-setting, warm-ups); problem-solving activities (brainstorming, hands-on exercises, reflection); and closure (consolidating concepts, cognitive mapping,…
Kossowska, Małgorzata; Szwed, Paulina; Wyczesany, Miroslaw; Czarnek, Gabriela; Wronka, Eligiusz
2018-01-01
Examining the relationship between brain activity and religious fundamentalism, this study explores whether fundamentalist religious beliefs increase responses to error-related words among participants intolerant to uncertainty (i.e., high in the need for closure) in comparison to those who have a high degree of toleration for uncertainty (i.e., those who are low in the need for closure). We examine a negative-going event-related brain potentials occurring 400 ms after stimulus onset (the N400) due to its well-understood association with the reactions to emotional conflict. Religious fundamentalism and tolerance of uncertainty were measured on self-report measures, and electroencephalographic neural reactivity was recorded as participants were performing an emotional Stroop task. In this task, participants read neutral words and words related to uncertainty, errors, and pondering, while being asked to name the color of the ink with which the word is written. The results confirm that among people who are intolerant of uncertainty (i.e., those high in the need for closure), religious fundamentalism is associated with an increased N400 on error-related words compared with people who tolerate uncertainty well (i.e., those low in the need for closure).
Environmental Impact Statement. Disposal and Reuse of George Air Force Base, California. Volume 1
1992-03-01
development area. Non-aviation land uses George AFB Disposal and Reuse FEIS S -1 proposed for property within the existing base boundary Include...local communities. S -2 George AFB Disposal and Reuse FEIS The baseline assumed In this document Is the conditions projected at base closure. Impacts...of George AFB are summarized In 5. 10. and 20 year intervals in Tables S -1 through S -6 and briefly described below. Influencing factors are non
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cantrell, Kirk J; Liikala, Terry L; Strenge, Dennis L
PNNL conducted independent site evaluations for four sites at Fort Lewis, Washington, to determine their suitability for closure on behalf of the installation. These sites were recommended for ''No Further Action'' by previous investigators and included the Storm Water Outfalls/Industrial Waste Water Treatment Plant (IWTP), the Pesticide Rinse Area, the Old Fire Fighting Training Pit, and the Illicit PCB Dump Site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cantrell, Kirk J.; Liikala, Terry L.; Strenge, Dennis L.
PNNL conducted independent site evaluations for four sites at Fort Lewis, Washington, to determine their suitability for closure on behalf of the installation. These sites were recommended for "No Further Action" by previous invesitgators and included the Storm Water Outfalls/Industrial Waste Water Treatment Plant (IWTP), the Pesticide Rinse Area, the Old Fire Fighting Training Pit, and the Illicit PCB Dump Site.
Stapler-assisted closure in total laryngectomy.
Anand, Akash G
2013-01-01
The total laryngectomy is a surgical procedure that requires technically sound reconstruction in order to preserve a patient's swallowing function. Traditionally, a handsewn technique has been utilized to accomplish this endeavor. Recent applications of surgical stapling devices have been noted in an attempt to circumvent the need for handsewn reconstruction. This paper documents the application of a surgical stapling device in reconstructing a total laryngectomy defect. A brief review of the literature is provided to compare the differences between handsewn techniques and stapling techniques.
Columbia River Component Data Gap Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
L. C. Hulstrom
2007-10-23
This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.
Iatrogenic perforation of perivaterian duodenal diverticulum: report of a case
Cavanagh, James E.
1996-01-01
The author reports a case of iatrogenic perforation of a duodenal diverticulum, an extremely rare occurrence, during percutaneous radiologic extraction of a retained common-bile-duct stone. Perforation was related to the perivaterian location of the duodenal diverticulum. Because an inflammatory reaction was present, tube duodenostomy was chosen over excision, closure and drainage to prevent the complication of lateral duodenal fistula and sepsis. Whenever iatrogenic duodenal perforation is suspected, prompt radiologic documentation and early surgical consultation should be sought. PMID:8697327
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choung, Sungwook; Um, Wooyong; Pacific Northwest National Laboratory
Permanent disposal of low- and intermediate-level radioactive wastes in the subterranean environment has been the preferred method of many countries, including Korea. A safety issue after the closure of a geological repository is that biodegradation of organic materials due to microbial activities generates gases that lead to overpressure of the waste containers in the repository and its disintegration with the release of radionuclides. As part of an ongoing large-scale in situ experiment using organic wastes and groundwater to simulate geological radioactive waste repository conditions, we investigated the geochemical alteration and microbial activities at an early stage (~63 days) intended tomore » be representative of the initial period after repository closure. The increased numbers of both aerobes and facultative anaerobes in waste effluents indicate that oxygen content could be the most significant parameter to control biogeochemical conditions at very early periods of reaction (<35 days). Accordingly, the values of dissolved oxygen and redox potential were decreased. The activation of anaerobes after 35 days was supported by the increased concentration to ~50 mg L-1 of ethanol. These results suggest that the biogeochemical conditions were rapidly altered to more reducing and anaerobic conditions within the initial 2 months after repository closure. Although no gases were detected during the study, activated anaerobic microbes will play more important role in gas generation over the long term.« less
NASA Astrophysics Data System (ADS)
Wilson, C.; Goodbred, S. L., Jr.; Wallace Auerbach, L.; Ahmed, K. R.; Small, C.; Sams, S. E.
2014-12-01
Over the last century, land use changes in the Ganges-Brahmaputra tidal delta have transformed >5000 km2 of intertidal mangrove forest to densely inhabited, agricultural islands that have been embanked to protect against tides and storm surges (i.e., polders). More recently, the conversion of rice paddies to profitable shrimp aquaculture has become increasingly widespread. Recent field studies documented that poldering in southwest Bangladesh has resulted in an elevation deficit relative to that of the natural mangrove forests and mean high water (MHW). The offset is a function of lost sedimentation, enhanced compaction, and an effective rise in MHW from tidal amplification. The morphologic adjustment of the tidal channel network to these perturbations, however, has gone largely undocumented. One effect has been the shoaling of many channels due to decreases in fluvial discharge and tidal prism. We document a previously unrecognized anthropogenic component: the widespread closure of large conduit tidal channels for land reclamation and shrimp farming. GIS analysis of historical Landsat and Google Earth imagery within six 1000 km2 study areas reveals that the tidal network in the natural Sundarbans mangrove forest has remained relatively constant since the 1970s, while significant changes are observed in human-modified areas. Construction of the original embankments removed >1000 km of primary tidal creeks, and >80 km2 of land has been reclaimed outside of polders through the closure of formerly active tidal channels (decrease in mean channel width from 256±91 m to 25±10 m). Tidal restriction by large sluice gates is prevalent, favoring local channel siltation. Furthermore, severing the intertidal platform and large conduit channels from the tidal network has had serious repercussions, such as increased lateral migration and straightening of the remaining channels. Where banklines have eroded, the adjacent embankments appear to be more vulnerable to failure, as observed from the effects of Cyclone Aila in 2009: multiple embankments failed at sites of recent channel migration and impounded primary creeks. Although global climate change and sea-level rise is a major concern for this low-lying delta, this study highlights the need to understand the repercussions of anthropogenic modification as well.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Project Integration
2005-09-26
The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.
The long-term prognosis of congenital portosystemic venous shunt.
Uchino, T; Matsuda, I; Endo, F
1999-08-01
Congenital portosystemic venous shunt (PSVS), considered to be a rare disease, can lead to hepatic encephalopathy (HE). With improvements in diagnostic imaging techniques, the number of infants and children with documented PSVS has increased. The natural course of the disease and indications for surgical closure of the shunt vessel have not been well defined. We reviewed 51 cases of congenital PSVS in Japan; 34 patients had an intrahepatic PSVS, and 17 had an extrahepatic PSVS. There were 12 patients with HE at the time of diagnosis. The frequency of HE increased in subjects over 60 years of age. Children with HE had a shunt ratio exceeding 60%. When the shunt ratio was less than 30%, HE did not occur. Twenty of 28 patients under the age of 15 years had hypergalactosemia at the time of neonatal screening. Part of the congenital intrahepatic PSVS spontaneously closed. Surgical closure of a PSVS may be an approach expected to prevent HE when the shunt ratio exceeds 60%.
Ruiz, Carlos E; Hahn, Rebecca T; Berrebi, Alain; Borer, Jeffrey S; Cutlip, Donald E; Fontana, Greg; Gerosa, Gino; Ibrahim, Reda; Jelnin, Vladimir; Jilaihawi, Hasan; Jolicoeur, E Marc; Kliger, Chad; Kronzon, Itzhak; Leipsic, Jonathon; Maisano, Francesco; Millan, Xavier; Nataf, Patrick; O'Gara, Patrick T; Pibarot, Philippe; Ramee, Stephen R; Rihal, Charanjit S; Rodes-Cabau, Josep; Sorajja, Paul; Suri, Rakesh; Swain, Julie A; Turi, Zoltan G; Tuzcu, E Murat; Weissman, Neil J; Zamorano, Jose L; Serruys, Patrick W; Leon, Martin B
2017-04-25
The VARC (Valve Academic Research Consortium) for transcatheter aortic valve replacement set the standard for selecting appropriate clinical endpoints reflecting safety and effectiveness of transcatheter devices, and defining single and composite clinical endpoints for clinical trials. No such standardization exists for circumferentially sutured surgical valve paravalvular leak (PVL) closure. This document seeks to provide core principles, appropriate clinical endpoints, and endpoint definitions to be used in clinical trials of PVL closure devices. The PVL Academic Research Consortium met to review evidence and make recommendations for assessment of disease severity, data collection, and updated endpoint definitions. A 5-class grading scheme to evaluate PVL was developed in concordance with VARC recommendations. Unresolved issues in the field are outlined. The current PVL Academic Research Consortium provides recommendations for assessment of disease severity, data collection, and endpoint definitions. Future research in the field is warranted. Copyright © 2017 American College of Cardiology Foundation and European Society of Cardiology. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Navarro Nevada Environmental Services
The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner,more » which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
SM Narbutovskih
2000-03-31
Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), themore » owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.« less
Back-to-back mechanisms drive actomyosin ring closure during Drosophila embryo cleavage
2016-01-01
Contraction of actomyosin rings during cytokinesis is typically attributed to actin filaments sliding toward each other via Myosin-2 motor activity. However, rings constrict in some cells in the absence of Myosin-2 activity. Thus, ring closure uses Myosin-2–dependent and –independent mechanisms. But what the Myosin-2–independent mechanisms are, and to what extent they are sufficient to drive closure, remains unclear. During cleavage in Drosophila melanogaster embryos, actomyosin rings constrict in two sequential and mechanistically distinct phases. We show that these phases differ in constriction speed and are genetically and pharmacologically separable. Further, Myosin-2 activity is required for slow constriction in “phase 1” but is largely dispensable for fast constriction in “phase 2,” and F-actin disassembly is only required for fast constriction in phase 2. Switching from phase 1 to phase 2 seemingly relies on the spatial organization of F-actin as controlled by Cofilin, Anillin, and Septin. Our work shows that fly embryos present a singular opportunity to compare separable ring constriction mechanisms, with varying Myosin-2 dependencies, in one cell type and in vivo. PMID:27799369
Moor, Andrea N; Tummel, Evan; Prather, Jamie L; Jung, Michelle; Lopez, Jonathan J; Connors, Sarah; Gould, Lisa J
2014-04-01
Advertisements targeted at the elderly population suggest that antioxidant therapy will reduce free radicals and promote wound healing, yet few scientific studies substantiate these claims. To better understand the potential utility of supplemental antioxidant therapy for wound healing, we tested the hypothesis that age and tissue ischemia alter the balance of endogenous antioxidant enzymes. Using a bipedicled skin flap model, ischemic and non-ischemic wounds were created on young and aged rats. Wound closure and the balance of the critical antioxidants superoxide dismutase and glutathione in the wound bed were determined. Ischemia delayed wound closure significantly more in aged rats. Lower superoxide dismutase 2 and glutathione in non-ischemic wounds of aged rats indicate a basal deficit due to age alone. Ischemic wounds from aged rats had lower superoxide dismutase 2 protein and activity initially, coupled with decreased ratios of reduced/oxidized glutathione and lower glutathione peroxidase activity. De novo glutathione synthesis, to restore redox balance in aged ischemic wounds, was initiated as evidenced by increased glutamate cysteine ligase. Results demonstrate deficiencies in two antioxidant pathways in aged rats that become exaggerated in ischemic tissue, culminating in profoundly impaired wound healing and prolonged inflammation.
Wen, Bing; Yang, Junya; Liu, Huiruo; Jiao, Zhouyang; Zhao, Wenzeng
2016-01-01
Objective: To document clinical experience of treating congenital heart disease combined with large patent ductus arteriosus with pulmonary artery closure in combination with patch technique. Methods: Thirty-six patients (8 males and 28 females) who suffered from congenital heart disease and underwent hybrid surgery in the First Affiliated Hospital of Zhengzhou University from October 2010 to February 2014 were selected for this study. They aged 14 to 39 years and weighed 32.20 to 61.50 kg. Diameter of arterial duct was between 10 mm and 13 mm; 28 cases were tube type, 4 cases were funnel type and four cases were window type. All patients had moderate or severe pulmonary arterial hypertension; besides, there were 28 cases of ventricular septal defect, 16 cases of atrial septal defect, eight cases of aortic insufficiency, four cases of mitral stenosis and insufficiency and four cases of infectious endocarditis. Cardz Pulmonary Bypass (CPB) was established after chest was opened along the middle line. With the help of Transesophageal echocardiography, large patent ductus arteriosus was blocked off through pulmonary artery. Pulmonary artery was cut apart after blocking of heart. Large patent ductus arteriosus on the side of pulmonary artery was strengthened with autologous pericardial patch. Results: Of 36 patients, 32 patients had patent ductus arteriosus closure device and four patients had atrial septal defect closure device. Pulmonary arteries of 36 cases were all successfully closed. Systolic pressure declined after closure ((54.86±19.23) mmHg vs (96.05±23.07) mmHg, p<0.05); average pulmonary arterial pressure also declined after closure ((39.15±14.83) mmHg vs (72.88±15.76) mmHg, p<0.05). The patients were followed up for one to fifty one months (average 11.5 months). Compared to before surgery, left atrial diameter, left ventricular diameter and pulmonary artery diameter all narrowed after surgery. Besides, clinical symptoms were relieved and cardiac function of the patients also improved. Conclusion: Hybrid surgery is feasible and safe in treating patients with large patent ductus arteriosus and congenital heart disease, which decreases surgical problems, shortens surgical time and lowers the incidence of complications. PMID:27375685
Wen, Bing; Yang, Junya; Liu, Huiruo; Jiao, Zhouyang; Zhao, Wenzeng
2016-01-01
To document clinical experience of treating congenital heart disease combined with large patent ductus arteriosus with pulmonary artery closure in combination with patch technique. Thirty-six patients (8 males and 28 females) who suffered from congenital heart disease and underwent hybrid surgery in the First Affiliated Hospital of Zhengzhou University from October 2010 to February 2014 were selected for this study. They aged 14 to 39 years and weighed 32.20 to 61.50 kg. Diameter of arterial duct was between 10 mm and 13 mm; 28 cases were tube type, 4 cases were funnel type and four cases were window type. All patients had moderate or severe pulmonary arterial hypertension; besides, there were 28 cases of ventricular septal defect, 16 cases of atrial septal defect, eight cases of aortic insufficiency, four cases of mitral stenosis and insufficiency and four cases of infectious endocarditis. Cardz Pulmonary Bypass (CPB) was established after chest was opened along the middle line. With the help of Transesophageal echocardiography, large patent ductus arteriosus was blocked off through pulmonary artery. Pulmonary artery was cut apart after blocking of heart. Large patent ductus arteriosus on the side of pulmonary artery was strengthened with autologous pericardial patch. Of 36 patients, 32 patients had patent ductus arteriosus closure device and four patients had atrial septal defect closure device. Pulmonary arteries of 36 cases were all successfully closed. Systolic pressure declined after closure ((54.86±19.23) mmHg vs (96.05±23.07) mmHg, p<0.05); average pulmonary arterial pressure also declined after closure ((39.15±14.83) mmHg vs (72.88±15.76) mmHg, p<0.05). The patients were followed up for one to fifty one months (average 11.5 months). Compared to before surgery, left atrial diameter, left ventricular diameter and pulmonary artery diameter all narrowed after surgery. Besides, clinical symptoms were relieved and cardiac function of the patients also improved. Hybrid surgery is feasible and safe in treating patients with large patent ductus arteriosus and congenital heart disease, which decreases surgical problems, shortens surgical time and lowers the incidence of complications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willoughby III, O.H.; Lukes, G.C.
EnergySolutions, LLC operates its Mixed Waste Facility at Clive, Utah under the provisions of its State-issued Part B Permit. The facility accepts waste that contains both hazardous and radioactive contaminants. Utah is an EPA Agreement State and therefore the Utah Division of Solid and Hazardous Waste (DSHW) is authorized to regulate the hazardous waste operations at the facility. The radioactive portion of the waste is regulated by the Utah Division of Radiation Control. 40 CFR 264.142 outlines the facility requirements for Closure Costs. The owner or operator must have a detailed written estimate of the cost of closing the facilitymore » in accordance with the rules. For many years the State of Utah had relied on the facility's estimate of closure costs as the amount that needed to be funded. This amount is reviewed annually and adjusted for inflation and for changes at the facility. In 2004 the agency and the facility requested bids from independent contractors to provide their estimate for closure costs. Three engineering firms bid on the project. The facility funded the project and both the agency and the facility chose one of the firms to provide an independent estimate. The engineering firms met with both parties and toured the facility. They were also provided with the current closure cost line items. Each firm provided an estimated cost for closure of the facility at the point in the facility's active life that would make the closure most expensive. Included with the direct costs were indirect line items such as overhead, profit, mobilization, hazardous working conditions and regulatory oversight. The agency and the facility reviewed the independent estimates and negotiated a final Closure and Post-Closure Cost Estimate for the Mixed Waste Facility. There are several mechanisms allowed under the rules to fund the Closure and Post- Closure Care Funds. EnergySolutions has chosen to fund their costs through the use of an insurance policy. Changing mechanisms from an irrevocable trust to an insurance policy required extensive review by the DSHW and the Utah Attorney General's Office. The duration of the Post-Closure Care Period is generally designated as 30 years under the hazardous waste rules. The Legislature of the State of Utah commissioned a review of the need for Perpetual Care Funds for hazardous waste facilities. This fund would provide funds for maintenance and monitoring of facilities following termination of the Post-Closure Permit. The DSHW has recommended to the legislature that a perpetual care fund be created. The legislature will study the recommendation and take appropriate action. (authors)« less
216-B-3 expansion ponds closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-10-01
This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steammore » condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.« less
Stephens, Neil; Dimond, Rebecca
2015-01-01
Biobanks are increasingly being established to act as mediators between patient-donors and researchers. In practice, some of these will close. This paper details the experiences of one such bank. We report interviews with the bank's staff and oversight group during the period when the bank ceased biobanking activity, reconfigured as a disseminator of best practice, before then closing altogether. The paper makes three distinct contributions: (i) to provide a detailed account of the establishment, operational challenges, and eventual closure of the bank, which makes clear the rapid turnover in a cycle of promise and disappointment; (ii) to explore this in terms of a novel analytical focus upon field, institutional, and individual expectations; and (iii) to use this typology to demonstrate how, even after the bank's closure, aspects of its work were reconfigured and reused in new contexts. This provides a unique empirical analysis of the under-reported issue of biobank closure. PMID:26740793
Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2010-02-28
Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
[Patent foramen ovale and decompression illness in divers].
Sivertsen, Wiebke; Risberg, Jan; Norgård, Gunnar
2010-04-22
About 25 % of the population has patent foramen ovale, and the condition has been assumed to be a causal factor in decompressive illness. Transcatheter closure is possible and is associated with a relatively low risk, but it has not been clarified whether there is an indication for assessment and treatment of the condition in divers. The present study explored a possible relationship between a patent foramen ovale and the risk for decompression illness in divers, if there are categories of divers that should be screened for the condition and what advice should be given to divers with this condition. The review is based on literature identified through a search in Pubmed and the authors' long clinical experience in the field. The risk of decompression illness for divers with a persistent foramen ovale is about five times higher than that in divers without this condition, but the absolute risk for decompression illness is only 2.5 after 10,000 dives. A causal association has not been shown between patent foramen ovale and decompression illness. Even if closure of patent foramen ovale may be done with relatively small risk, the usefulness of the procedure has not been documented in divers. We do not recommend screening for patent foramen ovale in divers because the absolute risk of decompression illness is small and transcatheter closure is only indicated after decompression illness in some occupational divers.
Prevention of pharyngocutaneous fistulas by means of laser-weld techniques.
Shohet, J A; Reinisch, L; Ossoff, R H
1995-07-01
Although much has been written on methods of dealing with pharyngocutaneous fistulas once they have formed, there are few reports of methods of preventing fistula formation from occurring. We examined the use of laser-weld techniques with the neodymium:yttrium aluminum garnet (Nd:YAG) and diode lasers to seal pharyngotomy closures. Laser-weld techniques have been used successfully in many other tissues, but reports documenting use in the upper aerodigestive tract are minimal. Indocyanine-green dye-enhanced collagen and fibrinogen were studied as laser solder materials for the diode laser. Twenty-nine experimental animals were studied. Neither the Nd:YAG nor the diode laser was successful in preventing fistula formation. Tensiometric studies documented significant strength of the laser welds ex vivo, but this finding was not clinically significant.
Silver-coated nylon dressing plus active DC microcurrent for healing of autogenous skin donor sites.
Malin, Edward W; Galin, Chaya M; Lairet, Kimberley F; Huzar, Todd F; Williams, James F; Renz, Evan M; Wolf, Steven E; Cancio, Leopoldo C
2013-11-01
Burn wounds are a significant cause of morbidity and mortality, and improved outcomes are demonstrated with early closure of both primary burn wounds and skin donor sites. Thus, technology that decreases the healing time of burns and donor sites would be potentially lifesaving. We present the results of a single-center, prospective, double-blinded, randomized controlled trial to evaluate the efficacy of silver-coated dressing with active microcurrent in comparison to silver-coated dressing with sham microcurrent on wound-closure time for autogenous skin donor sites. Four hundred five patients were screened for treatment of their donor sites using a silver-coated nylon dressing with either sham or active microcurrent stimulation. Thirty patients were enrolled in the study and then randomized. Of these, 5 patients were removed from analysis due to protocol deviations. Differences in time-to-closure were analyzed using Kaplan-Meier analysis and the proportional hazard regression model. Subjective verbal pain rating scores (0-10; 0, no pain; 10, worst pain) were also recorded. All devices were blinded and programmed at an outside facility, so that every patient had either an active or sham device. The study was unblinded only after the final patient's donor site had healed. All patients achieved donor-site healing before postoperative day 20. The 14 patients in the active microcurrent group [mean, 10.8 (2.9) days; range, 7-15 days] experienced no difference in time to wound healing as compared to the remaining patients in the sham microcurrent group [mean, 11.1 (2.0) days; range, 8-14 days; P = 0.75]. There were no differences in pain from one group compared to the other. None of the donor sites exhibited clinical signs of infection. In a sample size of 25 burn patients, the addition of direct microcurrent to silver-nylon dressings did not decrease time to wound closure of skin donor sites, and it did not show a difference in reported pain levels.
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
2000-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less
EPA Tribal Areas (4 of 4): Alaska Native Allotments
This dataset is a spatial representation of the Public Land Survey System (PLSS) in Alaska, generated from land survey records. The data represents a seamless spatial portrayal of native allotment land parcels, their legal descriptions, corner positioning and markings, and survey measurements. This data is intended for mapping purposes only and is not a substitute or replacement for the legal land survey records or other legal documents.Measurement and attribute data are collected from survey records using data entry screens into a relational database. The database design is based upon the FGDC Cadastral Content Data Standard. Corner positions are derived by geodetic calculations using measurement records. Closure and edgematching are applied to produce a seamless dataset. The resultant features do not preserve the original geometry of survey measurements, but the record measurements are reported as attributes. Additional boundary data are derived by spatial capture, protraction and GIS processing. The spatial features are stored and managed within the relational database, with active links to the represented measurement and attribute data.
BOREAS HYD-3 Subcanopy Incoming Solar Radiation Measurements
NASA Technical Reports Server (NTRS)
Hardy, Janet P.; Hall, Forrest G. (Editor); Knapp, David E. (Editor); Davis, Robert E.; Smith, David E. (Technical Monitor)
2000-01-01
The Boreal Ecosystem-Atmosphere Study (BOREAS) Hydrology (HYD)-3 team collected several data sets related to the hydrology of forested areas. This data set contains solar radiation measurements from several pyranometers (solar radiometers) placed on the snow surface in jack pine (1994) and black spruce and aspen forests (1996) in the BOREAS southern study area (SSA). An array of radiometers was used to collect data for three to four consecutive days in each forest type to study the hypothesis that energy transfer and snow water equivalent would vary spatially as a function of canopy closure. The quality of the data is good, because the days were generally clear and the radiometers were checked daily to remove anything that landed on the radiometers. The data are available in tabular ASCII files. The subcanopy incoming solar radiation measurement data are available from the Earth Observing System Data and Information System (EOSDIS) Oak Ridge National Laboratory (ORNL) Distributed Active Archive Center (DAAC). The data files are available on a CD-ROM (see document number 20010000884).
ORNL Remedial Action Program strategy (FY 1987-FY 1992)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabalka, J.R.; Myrick, T.E.
1987-12-01
Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less
Johnson, Carole D.; White, Eric A.; Joesten, Peter K.
2012-01-01
Time‐lapse geophysical surveys using frequency‐domain electromagnetics (FDEM) can indirectly measure time‐varying hydrologic parameters such as fluid saturation or solute concentration. Monitoring of these processes provides insight into aquifer properties and the effectiveness of constructed controls (such as leachate interceptor trenches), as well as aquifer responses to natural or induced stresses. At the University of Connecticut landfill, noninvasive, electromagnetic induction (EMI) methods were used to monitor changes in subsurface electrical conductivity that were related to the landfill‐closure activities. After the landfill was closed, EMI methods were used to monitor changes in water saturation and water quality. As part of a long‐term monitoring plan to observe changes associated with closure, redevelopment, and remediation of the former landfill, EMI data were collected to supplement information from groundwater samples collected in wells to the south and north of the landfill. In comparison to single‐point measurements that could have been collected by conventional installation of additional monitoring wells, the EMI methods provided increased spatial coverage, and were less invasive and therefore less destructive to the wetland north of the landfill. To monitor effects of closure activities on the subsurface conductivity, EMI measurements were collected from 2004 to 2011 along discrete transects north and south of the landfill prior to, during, and after the landfill closure. In general, the results indicated an overall decline in subsurface electrical conductivity with time and with distance from the former landfill. This decline in electrical conductivity indicated that the closure and remediation efforts reduced the amount of leachate that originated from the landfill and that entered the drainages to the north and south of the landfill.
A Rab5 GTPase module is important for autophagosome closure
Lipatova, Zhanna; Sun, Dan; Zhu, Xiaolong; Li, Rui; Wu, Zulin; You, Weiming; Cong, Xiaoxia; Zhou, Yiting; Gyurkovska, Valeriya; Liu, Yutao; Li, Qunli; Li, Wenjing; Cheng, Jie; Segev, Nava
2017-01-01
In the conserved autophagy pathway, the double-membrane autophagosome (AP) engulfs cellular components to be delivered for degradation in the lysosome. While only sealed AP can productively fuse with the lysosome, the molecular mechanism of AP closure is currently unknown. Rab GTPases, which regulate all intracellular trafficking pathways in eukaryotes, also regulate autophagy. Rabs function in GTPase modules together with their activators and downstream effectors. In yeast, an autophagy-specific Ypt1 GTPase module, together with a set of autophagy-related proteins (Atgs) and a phosphatidylinositol-3-phosphate (PI3P) kinase, regulates AP formation. Fusion of APs and endosomes with the vacuole (the yeast lysosome) requires the Ypt7 GTPase module. We have previously shown that the Rab5-related Vps21, within its endocytic GTPase module, regulates autophagy. However, it was not clear which autophagy step it regulates. Here, we show that this module, which includes the Vps9 activator, the Rab5-related Vps21, the CORVET tethering complex, and the Pep12 SNARE, functions after AP expansion and before AP closure. Whereas APs are not formed in mutant cells depleted for Atgs, sealed APs accumulate in cells depleted for the Ypt7 GTPase module members. Importantly, depletion of individual members of the Vps21 module results in a novel phenotype: accumulation of unsealed APs. In addition, we show that Vps21-regulated AP closure precedes another AP maturation step, the previously reported PI3P phosphatase-dependent Atg dissociation. Our results delineate three successive steps in the autophagy pathway regulated by Rabs, Ypt1, Vps21 and Ypt7, and provide the first insight into the upstream regulation of AP closure. PMID:28934205
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krause
2010-08-01
This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less
Surgical management of perforated duodenal ulcer: the changing scene.
Plummer, J M; McFarlane, M E C; Newnham
2004-12-01
To determine the management of perforated duodenal ulcer at the University Hospital of the West Indies (UHWI) in this era of Helicobacter pylori, the medical records of all patients seen at the UHWI during the period July 1997 to June 2002 with an intra-operative diagnosis of perforated peptic ulcer were reviewed The records were analyzed for the following: age, gender, duration of symptoms, non-steroidal anti-inflammatory drug (NSAID) use, smoking status, operative repair duration of hospitalization, Helicobacter pylori status and medical therapy, peri-operative complications, mortality and recurrence. Ninety per cent of the cases were males. All females in whom perforation occurred were age 50 years and older compared to males where 58% of cases presented before age 50 years. Perforations in acute ulcers occurred in 80% of cases. The majority of patients were male smokers. Non-steroidal anti-inflammatory drug use was also an important risk factor in elderly females. Simple surgical closure and standard triple therapy antibiotics to eradicate Helicobacter pylori was the most common treatment offered. Mortality was one per cent and follow-up poor but 11% of patients had documented recurrent peptic ulceration. In this study population, perforated duodenal ulcer occured overwhelmingly in males less than 50 years of age. There is a trend towards exclusive simple surgical closure and H pylori eradication at the UHWI for patients with perforated duodenal ulcer but this needs to be supported by documentation of H pylori prevalence in the population of patients presenting with perforated peptic ulcers.
Hamiltonian closures in fluid models for plasmas
NASA Astrophysics Data System (ADS)
Tassi, Emanuele
2017-11-01
This article reviews recent activity on the Hamiltonian formulation of fluid models for plasmas in the non-dissipative limit, with emphasis on the relations between the fluid closures adopted for the different models and the Hamiltonian structures. The review focuses on results obtained during the last decade, but a few classical results are also described, in order to illustrate connections with the most recent developments. With the hope of making the review accessible not only to specialists in the field, an introduction to the mathematical tools applied in the Hamiltonian formalism for continuum models is provided. Subsequently, we review the Hamiltonian formulation of models based on the magnetohydrodynamics description, including those based on the adiabatic and double adiabatic closure. It is shown how Dirac's theory of constrained Hamiltonian systems can be applied to impose the incompressibility closure on a magnetohydrodynamic model and how an extended version of barotropic magnetohydrodynamics, accounting for two-fluid effects, is amenable to a Hamiltonian formulation. Hamiltonian reduced fluid models, valid in the presence of a strong magnetic field, are also reviewed. In particular, reduced magnetohydrodynamics and models assuming cold ions and different closures for the electron fluid are discussed. Hamiltonian models relaxing the cold-ion assumption are then introduced. These include models where finite Larmor radius effects are added by means of the gyromap technique, and gyrofluid models. Numerical simulations of Hamiltonian reduced fluid models investigating the phenomenon of magnetic reconnection are illustrated. The last part of the review concerns recent results based on the derivation of closures preserving a Hamiltonian structure, based on the Hamiltonian structure of parent kinetic models. Identification of such closures for fluid models derived from kinetic systems based on the Vlasov and drift-kinetic equations are presented, and connections with previously discussed fluid models are pointed out.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, Catherine S.; Berends, Rebecca F.; Flint, David J.
2013-02-15
Reducing Cx43 expression stimulates skin wound healing. This is mimicked in models when Cx43 function is blocked by the connexin mimetic peptide Gap27. IGF-I also stimulates wound healing with IGFBP-5 attenuating its actions. Further, the IGF-I to IGFBP-5 ratio is altered in diabetic skin, where wound closure is impaired. We investigated whether Gap27 remains effective in augmenting scrape-wound closure in human skin wound models simulating diabetes-induced changes, using culture conditions with raised glucose, insulin and IGFBP-5. Gap27 increased scrape-wound closure in normal glucose and insulin (NGI) and to a lesser extent in high glucose and insulin (HGI). IGF-I enhanced scrape-woundmore » closure in keratinocytes whereas IGFBP-5 inhibited this response. Gap27 overcame the inhibitory effects of IGFBP-5 on IGF-I activity. Connexin-mediated communication (CMC) was reduced in HGI, despite raised Cx43, and Gap27 significantly decreased CMC in NGI and HGI. IGF-I and IGFBP-5 did not affect CMC. IGF-I increased keratinocyte proliferation in NGI, and Gap27 increased proliferation in NGI to a greater extent than in HGI. We conclude that IGF-I and Gap27 stimulate scrape-wound closure by independent mechanisms with Gap27 inhibiting Cx43 function. Gap27 can enhance wound closure in diabetic conditions, irrespective of the IGF-I:IGFBP-5 balance. - Highlights: ► Human organotypic and keratinocyte ‘diabetic’ skin models were used to demonstrate the ability of Gap27 to improve scrape-wound closure. ► Gap27 enhanced scrape-wound closure by reducing Cx43-mediated communication, whereas IGFBP-5 retarded cell migration. ► IGF-I and IGFBP-5 did not affect connexin-mediated pathways. ► Gap27 can override altered glucose, insulin, IGF-I, and IGFBP-5 in ‘diabetic’ skin models and thus has therapeutic potential.« less
Sadique, Zia; Lopman, Ben; Cooper, Ben S; Edmunds, W John
2016-02-01
Norovirus is the most common cause of outbreaks of acute gastroenteritis in National Health Service hospitals in the United Kingdom. Wards (units) are often closed to new admissions to stop the spread of the virus, but there is limited evidence describing the cost-effectiveness of ward closure. An economic analysis based on the results from a large, prospective, active-surveillance study of gastroenteritis outbreaks in hospitals and from an epidemic simulation study compared alternative ward closure options evaluated at different time points since first infection, assuming different efficacies of ward closure. A total of 232 gastroenteritis outbreaks occurring in 14 hospitals over a 1-year period were analyzed. The risk of a new outbreak in a hospital is significantly associated with the number of admission, general medical, and long-stay wards that are concurrently affected but is less affected by the level of community transmission. Ward closure leads to higher costs but reduces the number of new outbreaks by 6%-56% and the number of clinical cases by 1%-55%, depending on the efficacy of the intervention. The incremental cost per outbreak averted varies from £10 000 ($14 000) to £306 000 ($428 000), and the cost per case averted varies from £500 ($700) to £61 000 ($85 000). The cost-effectiveness of ward closure decreases as the efficacy of the intervention increases, and the cost-effectiveness increases with the timing of the intervention. The efficacy of ward closure is critical from a cost-effectiveness perspective. Ward closure may be cost-effective, particularly if targeted to high-throughput units. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less
Hardman, John; Muzaffar, Jameel; Nankivell, Paul; Coulson, Chris
2015-06-01
To study the effectiveness of Type 1 tympanoplasty for chronic tympanic membrane perforations in the pediatric age group and to investigate factors influencing its success. Searches were conducted of the MEDLINE database and the Cochrane Database of Systematic Reviews using terms focused around tympanoplasty and children. Searches were performed on June 23, 2014 and limited to English language entries since January 1, 1997. Studies reporting tympanoplasty closure rates in children 18 years and younger, with a minimum follow-up of 6 months, were included. Studies focusing on more advanced forms of tympanoplasty and revision surgery were excluded. Five hundred sixty-four articles were screened identifying 2,609 cases from 45 eligible studies. Data were collected by consensus of the first two authors with the third author arbitrating disparities of opinion. Success was taken as the closure rate at 12 months where possible. Forest plots with Mantel-Haenszel analyses were used to compare closure rates with respect to perforation size, adenoidectomy, status of contralateral ear, Eustachian tube function, active infection, and graft position. Linear regression and Fisher's exact were used to analyze closure rate with respect to age. The mean weighted closure rate for pediatric tympanoplasty was 83.4%. Subgroup analysis found age not to be a significant factor affecting the closure rate. Tympanoplasties performed on larger perforations or in children with abnormal contralateral ear findings were more likely to fail. Surgery may be best delayed until contralateral otitis media with effusion has settled.
Safety Oversight of Decommissioning Activities at DOE Nuclear Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zull, Lawrence M.; Yeniscavich, William
2008-01-15
The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive materialmore » contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.« less
Parrett, Brian M; Matros, Evan; Pribaz, Julian J; Orgill, Dennis P
2006-04-01
Open lower leg fractures with exposed bone or tendon continue to be challenging for plastic surgeons. Microvascular free-tissue transfer increases the ability to close wounds, transfer vascularized bone, and prevent amputation, yet remains a complex, invasive procedure with significant complication rates, donor-site morbidity, and failure rates. This review documents the changing treatment protocol in the authors' institution for these injuries. Two hundred ninety consecutive open tibia-fibula fractures over a 12-year period (1992 to 2003) were retrospectively reviewed and methods and outcomes were compared by grouping the fractures into 4-year intervals. The number of open lower extremity fractures increased, whereas the distribution of Gustilo grade I to III fractures remained unchanged. Overall, free-tissue transfer was performed less frequently and constituted 20 percent of reconstructions in period 1 (1992 to 1995), 11 percent in period 2 (1996 to 1999), and 5 percent in period 3 (2000 to 2003). For the most severe fractures, Gustilo grade III, free-flap reconstruction has decreased significantly, constituting 42 percent, 26 percent, and 11 percent of procedures in periods 1, 2, and 3, respectively. Local flaps for grade III fractures have remained relatively constant throughout the study. In contrast, local wound care for grade III fractures, including skin grafts, delayed primary closures, and secondary intention closures has significantly increased from 22 percent to 49 percent of reconstructions from periods 1 through 3. In 1997, the authors began to use the vacuum-assisted closure device and now use it in nearly half of all open fractures. Despite this trend, there has been no change in infection, amputation, or malunion/nonunion rates and a decrease in reoperation rate with at least 1-year follow-up. These results demonstrate a change in practice, with a trend down the reconstructive ladder, currently using fewer free flaps and more delayed closures and skin grafts with frequent use of the vacuum-assisted closure sponge. Possible reasons for this change are a better understanding of lower leg vascular anatomy and better use of improved wound care technology.
NASA Astrophysics Data System (ADS)
Voumard, Jérémie; Derron, Marc-Henri; Jaboyedoff, Michel
2017-04-01
The Weisstannen small alpine valley located in the Canton of St-Gallen, Switzerland, has been affected by four different natural hazards these three last years. Its unique access road has been cut off height times during this period: by an earth slide in January 2014, by three debris flows in August 2015, by one debris flow in September 2016, by two floods in June and July 2016 and by a rockfall in May 2016. Although the valley is sparsely populated, 240 people have been affected by the height road closures due to these events. In addition to road damages, several buildings, of which a restaurant (with EUR 190'000 damages) and an animal shelter, have been damaged. In Switzerland, some roads of 15 communes have been affected by natural hazards at least three times in five years (2012-2016). Then the Weisstannen valley is not an exception at the communal level. However, it is the only valley whose unique access was cut off three consecutive years. With these repeated events, the population of the valley does not understand how possible it is to end up in such a situation in a country accustomed to natural hazards. In the media and social media, people do not hide their irritation regarding to this situation: "Have the authorities failed to take into account natural dangers despite of the 4.7 million Euro allocated for a flood protection project? Who is responsible of those repeated damages? Why the situation did not improve after the events of the first year and then the second year? ". In the present work, we try to shed the light on this peculiar case analysing the causes of road closures, studying meteorological, topographical, hydrological and geological data for each events. The effectiveness of the new protective measures built between the events are assessed, as the future planned protectives measures. Road closures consequences on the population and the economy are also estimated. Finally, we estimate the probability of having new road closures in the Weisstannen valley during the next years. Data about the events were documented during field visit, or obtained from the media and official reports.
Frequent Application of the New Gelatin-Collagen Nonwoven Accelerates Wound Healing.
Schiefer, Jennifer L; Rath, Rebekka; Held, Manuel; Petersen, Wiebke; Werner, Jan-Ole; Schaller, Hans-Eberhard; Rahmanian-Schwarz, Afshin
2016-02-01
Mortality after chronic wounds is high. Thus, proper and effective therapy is of critical importance. Adult mammalian skin cannot regenerate spontaneously. It heals under scar formation in a process of repair. In general, wound closure is achieved through a combination of contraction, scar formation, and regeneration. To enhance wound healing, research groups are continuously inventing and evaluating novel skin replacement products. A single application of a new gelatin-collagen nonwoven accelerates wound closure of full-thickness skin defects. Therefore, the authors' objective was to evaluate the effect of a higher application frequency of the nonwoven on wound closure in a minipig model. Four full-thickness skin defects were created surgically on the dorsum of 12 Göttingen minipigs. Next, 3 wounds were treated randomly with a novel gelatin-collagen nonwoven in different thicknesses, while the fourth wound was left untreated and served as the control wound. Moreover, 6 minipigs achieved multiple applications of the wound dressing. During the experimental period of 21 days, a close-up photographic documentation was performed. Finally, the areas of the initial wounds were excised and examined histologically. More frequent application of the nonwoven achieved accelerated wound healing and better epidermis quality compared with a single application. Mean time until wound closure of all wounds treated with a multiple application of the nonwoven was 11.0 (± 1.2) days, compared with a single application of the nonwoven with 12.4 (± 1.26) days and control wounds with 13.5 (± 1.19) days. Furthermore, the epidermal thickness of all wounds treated with multiple applications of the nonwoven was increased by 10.67 μm (31.89 ± 8.86 μm, P = .0007) compared with a single application of the nonwoven and by 6.53 μm (27.75 ± 7.24 μm, P = .0435) compared with the control group. Multiple applications of the gelatin-collagen nonwoven may be an appropriate treatment for chronic wounds leading to a fast wound closure through a combination of contraction and re-epithelialization.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barber, Brenda; Honerlah, Hans; O'Neill, Mike
2012-07-01
Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineersmore » (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark McLane
2005-03-01
This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for CAU 383.« less
Multivariate moment closure techniques for stochastic kinetic models
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lakatos, Eszter, E-mail: e.lakatos13@imperial.ac.uk; Ale, Angelique; Kirk, Paul D. W.
2015-09-07
Stochastic effects dominate many chemical and biochemical processes. Their analysis, however, can be computationally prohibitively expensive and a range of approximation schemes have been proposed to lighten the computational burden. These, notably the increasingly popular linear noise approximation and the more general moment expansion methods, perform well for many dynamical regimes, especially linear systems. At higher levels of nonlinearity, it comes to an interplay between the nonlinearities and the stochastic dynamics, which is much harder to capture correctly by such approximations to the true stochastic processes. Moment-closure approaches promise to address this problem by capturing higher-order terms of the temporallymore » evolving probability distribution. Here, we develop a set of multivariate moment-closures that allows us to describe the stochastic dynamics of nonlinear systems. Multivariate closure captures the way that correlations between different molecular species, induced by the reaction dynamics, interact with stochastic effects. We use multivariate Gaussian, gamma, and lognormal closure and illustrate their use in the context of two models that have proved challenging to the previous attempts at approximating stochastic dynamics: oscillations in p53 and Hes1. In addition, we consider a larger system, Erk-mediated mitogen-activated protein kinases signalling, where conventional stochastic simulation approaches incur unacceptably high computational costs.« less
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
40 CFR 265.310 - Closure and post-closure care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suber, Gregory
2012-07-01
In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.
2012-07-01
The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less
The new I-64 economic and regional mobility study.
DOT National Transportation Integrated Search
2011-11-01
The Final Report summarizes the 2008 and 2009 Annual Reports of all studys activities conducted during the I-64 Full-closure construction project in the St. Louis, Missouri region. These activities included project communications, public opinions,...
Bischof, Dominique B; Ganter, Michael T; Shore-Lesserson, Linda; Hartnack, Sonja; Klaghofer, Richard; Graves, Kirk; Genoni, Michele; Hofer, Christoph K
2015-01-01
The aim of the study was to determine if Sonoclot with its sensitive glass bead-activated, viscoelastic test can predict postoperative bleeding in patients undergoing cardiac surgery at predefined time points. A prospective, observational clinical study. A teaching hospital, single center. Consecutive patients undergoing cardiac surgery (N = 300). Besides routine laboratory coagulation studies and heparin management with standard (kaolin) activated clotting time, additional native blood samples were analyzed on a Sonoclot using glass bead-activated tests. Glass bead-activated clotting time, clot rate, and platelet function were recorded immediately before anesthesia induction and at the end of surgery after heparin reversal but before chest closure. Primary outcome was postoperative blood loss (chest tube drainage at 4, 8, and 12 hours postoperatively). Secondary outcome parameters were transfusion requirements, need for surgical re-exploration, time of mechanical ventilation, length of intensive care unit and hospital stay, and hospital morbidity and mortality. Patients were categorized into "bleeders" and "nonbleeders." Patient characteristics, operations, preoperative standard laboratory parameters, and procedural times were comparable between bleeders and nonbleeders except for sex and age. Bleeders had higher rates of transfusions, surgical re-explorations, and complications. Only glass bead measurements by Sonoclot after heparin reversal before chest closure but not preoperatively were predictive for increased postoperative bleeding. Sonoclot with its glass bead-activated tests may predict the risk for postoperative bleeding in patients undergoing cardiac surgery at the end of surgery after heparin reversal but before chest closure. Copyright © 2015 Elsevier Inc. All rights reserved.
Lee, Sung Chul; Lim, Chae Woo; Lan, Wenzhi; He, Kai; Luan, Sheng
2013-03-01
Plant hormone abscisic acid (ABA) serves as an integrator of environmental stresses such as drought to trigger stomatal closure by regulating specific ion channels in guard cells. We previously reported that SLAC1, an outward anion channel required for stomatal closure, was regulated via reversible protein phosphorylation events involving ABA signaling components, including protein phosphatase 2C members and a SnRK2-type kinase (OST1). In this study, we reconstituted the ABA signaling pathway as a protein-protein interaction relay from the PYL/RCAR-type receptors, to the PP2C-SnRK2 phosphatase-kinase pairs, to the ion channel SLAC1. The ABA receptors interacted with and inhibited PP2C phosphatase activity against the SnRK2-type kinase, releasing active SnRK2 kinase to phosphorylate, and activate the SLAC1 channel, leading to reduced guard cell turgor and stomatal closure. Both yeast two-hybrid and bimolecular fluorescence complementation assays were used to verify the interactions among the components in the pathway. These biochemical assays demonstrated activity modifications of phosphatases and kinases by their interaction partners. The SLAC1 channel activity was used as an endpoint readout for the strength of the signaling pathway, depending on the presence of different combinations of signaling components. Further study using transgenic plants overexpressing one of the ABA receptors demonstrated that changing the relative level of interacting partners would change ABA sensitivity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-01-31
This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.
100-N Area underground storage tank closures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rowley, C.A.
1993-08-01
This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.
Arrhythmias in Patients with Atrial Defects.
Contractor, Tahmeed; Mandapati, Ravi
2017-06-01
Atrial arrhythmias are common in patients with atrial septal defects. A myriad of factors are responsible for these that include remodeling related to the defect and scar created by the repair or closure. An understanding of potential arrhythmias, along with entrainment and high-density activation mapping can result in accurate diagnosis and successful ablation. Atrial fibrillation is being seen increasingly after patent foramen ovale closure and may be the primary etiology of recurrent stroke in these patients. Copyright © 2017 Elsevier Inc. All rights reserved.
Conformation changes in the Glutamate receptor as studied by LRET
NASA Astrophysics Data System (ADS)
Jayaraman, Vasanthi
2009-03-01
Glutamate receptors are the primary mediators of excitatory neurotransmission in the mammalian central nervous system. Glutamate binding to an extracellular ligand binding domain initiates a series of conformational changes that results in the formation of cation selective transmembrane ion channels that ultimately desensitize. We have used luminescence resonance energy transfer to determine the conformational changes that underlie the allosteric process of glutamate mediated gating in the receptor. These investigations showed that agonist binding induced cleft closure in the ligand binding domain confirming that this change observed in the isolated ligand binding domain of the receptor is one of the mechanisms by which agonist mediates activation. The LRET investigations also allowed a study of the conformational changes between the subunits. The apo state of the protein showed a dimer interface that was open. The dimer interface was brought together only in the activated state, suggesting that cleft closure drives the formation of the contacts at dimer interface, which in turn transiently stabilizes the open channel. At longer times, the stress induced by the transmembrane segments, ultimately drives the breakdown of the interface, leading to channel closure and receptor desensitization.
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
40 CFR 264.228 - Closure and post-closure care.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...
Historical upscaling of the socio-hydrological cycle: Three cases from the Mediterranean Spain
NASA Astrophysics Data System (ADS)
Macian-Sorribes, Hector; Pulido-Velazquez, Manuel; Sanchis-Ibor, Carles
2015-04-01
Understanding the co-evolution between hydrological and socio-economic systems is vital to assess how anthropogenic and natural systems will evolve and interact in the future. Examining past socio-hydrological changes is therefore important to produce knowledge able to develop socio-hydrological models for predicting the future hydrology and society evolution patterns. As noticeable climate changes leading to higher water stress are expected in the Mediterranean Europe, socio-hydrological processes are likely to suffer considerable modifications in the XXI century, driving to potential conflicts as water demand increases while water resources fall. The goal of this contribution is to identify the hydro-social processes that have caused water conflicts, and how they have been solved in the Mediterranean Spain. The method is based in the analysis of historical documents, available since the Middle Ages. Once historical water conflicts (always well-documented) were located, a socio-hydrological "causal loop" is formulated, determining what caused that conflict, what factors or chain of factors were involved, and how it was addressed. Repeating that process for all the reported water conflicts allow us to gain insight into their driving forces, the socio-hydrological relationships linked to those, and the successful (and unsuccessful) strategies employed to address them. Three cases were selected from the Mediterranean Spain: the Mijares, the Turia and the Jucar river basins. All of them share similar documental sources (the Royal Archives, courts' archives, municipal archives and farmers' archives), similar climate and similar socio-economic backgrounds. Moreover, all of them are predicted to suffer similar climate change impacts. Irrigation is their major water demand. In these three rivers, during the last millennia, successive waterscapes have been constructed by different societies, in a prolonged process of institutional and environmental up-scaling, from the local level to the basin level, based on collaborative actions through multistakeholder partnerships and agreements. Irrigation development has played a major role in the evolutionary trend of the hydro-social cycle in the three basins, determining water demands and uses, and boosting institutional building. Following the main historical institutional milestones and examining the historical changes in water uses, remarkable differences can be found among the three cases, enhancing the high sensitivity of the hydrological processes with respect to socio-economic factors. Therefore, comparing them is adequate to find out those high-sensitive factors and the way they provoke the differences between the basins. The casual loop created a basin closure - basin reopening cycle. Basin closures were associated to increasing demands by population growth, irrigation and immigration, causing drought vulnerability. Basin reopenings corresponded to the building of regulation facilities (reservoirs, canals), the availability of new water sources (groundwater, regenerated water), or a change in the management strategies (conjunctive use). During basin closure, users fought during droughts but united to prevent new users' access to water. During reopenings, water use quickly increased, leading to basin closures. User conflicts were solved by user agreement in water sharing or by law requirement, establishing a new management policy. New-user conflicts were solved when the basin reopened again and those potential users gained access to water.
Yekondi, Shweta; Liang, Fu-Chun; Okuma, Eiji; Radziejwoski, Amandine; Mai, Hsien-Wei; Swain, Swadhin; Singh, Prashant; Gauthier, Mathieu; Chien, Hsiao-Chiao; Murata, Yoshiyuki; Zimmerli, Laurent
2018-04-01
Stomatal immunity restricts bacterial entry to leaves through the recognition of microbe-associated molecular patterns (MAMPs) by pattern-recognition receptors (PRRs) and downstream abscisic acid and salicylic acid signaling. Through a reverse genetics approach, we characterized the function of the L-type lectin receptor kinase-V.2 (LecRK-V.2) and -VII.1 (LecRK-VII.1). Analyses of interactions with the PRR FLAGELLIN SENSING2 (FLS2) were performed by co-immunoprecipitation and bimolecular fluorescence complementation and whole-cell patch-clamp analyses were used to evaluate guard cell Ca 2+ -permeable cation channels. The Arabidopsis thaliana LecRK-V.2 and LecRK-VII.1 and notably their kinase activities were required for full activation of stomatal immunity. Knockout lecrk-V.2 and lecrk-VII.1 mutants were hyper-susceptible to Pseudomonas syringae infection and showed defective stomatal closure in response to bacteria or to the MAMPs flagellin and EF-Tu. By contrast, Arabidopsis over-expressing LecRK-V.2 or LecRK-VII.1 demonstrated a potentiated stomatal immunity. LecRK-V.2 and LecRK-VII.1 are shown to be part of the FLS2 PRR complex. In addition, LecRK-V.2 and LecRK-VII.1 were critical for methyl jasmonate (MeJA)-mediated stomatal closure, notably for MeJA-induced activation of guard cell Ca 2+ -permeable cation channels. This study highlights the role of LecRK-V.2 and LecRK-VII.1 in stomatal immunity at the FLS2 PRR complex and in MeJA-mediated stomatal closure. © 2017 The Authors. New Phytologist © 2017 New Phytologist Trust.
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. M. Fitzmaurice
2001-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).« less
Meimoun, Patrice; Vidal, Guillaume; Bohrer, Anne-Sophie; Lehner, Arnaud; Tran, Daniel; Briand, Joël; Bouteau, François
2009-01-01
In Arabidopsis thaliana cell suspension,abscisic acid (aBa) induces changes in cytosolic calcium concentration ([Ca2+]cyt) which are the trigger for aBa-induced plasma membrane anion current activation, H+-aTPase inhibition, and subsequent plasma membrane depolarization. In the present study, we took advantage of this model to analyze the implication of intracellular Ca2+ stores in aBa signal transduction through electrophysiological current measurements, cytosolic Ca2+ activity measurements with the apoaequorin Ca2+ reporter protein and external pH measurement. Intracellular Ca2+ stores involvement was determined by using specific inhibitors of CICR channels: the cADP-ribose/ryanodine receptor (Br-cADPR and dantrolene) and of the inositol trisphosphate receptor (U73122). In addition experiments were performed on epidermal strips of A. thaliana leaves to monitor stomatal closure in response to ABA in presence of the same pharmacology. Our data provide evidence that ryanodine receptor and inositol trisphosphate receptor could be involved in ABA-induced (1) Ca2+ release in the cytosol, (2) anion channel activation and H+-ATPase inhibition leading to plasma membrane depolarization and (3) stomatal closure. Intracellular Ca2+ release could thus contribute to the control of early events in the ABA signal transduction pathway in A. thaliana. PMID:19847112
NASA Astrophysics Data System (ADS)
Williams, Richard Leroy
Wound healing is a complex process leading to the maintenance of skin integrity. Stress is known to increase susceptibility to bacterial infection, alter proinflammatory cytokine expression, and delay wound closure. Recently, antimicrobial peptides have generated interest due to their prokaryotic selectivity, decreased microbial resistance and multifunctional roles in wound healing, including fibroblast stimulation, keratinocyte migration and leukocyte migration. The objective of this dissertation project was to evaluate the effect of a synthetic antimicrobial decapeptide (KSLW) on bacterial clearance inflammation, and wound closure during stress-impaired healing. SKH-1 mice were randomly assigned to either control or restraint-stressed (RST) groups. Punch biopsy wounds (3.5 mm in diameter) were created bilaterally on the dorsal skin. Wounds were injected with 50 microL of empty carriers or KSLW prepared in Pluronic-F68, phospholipid micelles, or saline. Bacterial assays of harvested wounds were conducted on BHI agar. Wound closure was determined by photoplanimetry. Cytokine and growth factor mRNA expression was assessed with real-time RT-PCR. Human neutrophil migration assays and checkerboard analyses were performed using Transweli plates, and counting on hemacytometer. Oxidative burst activity was measured by spectrophotometric analysis of 2,7-dichlorofluorescein oxidation. KSLW-treatment resulted in significant reductions in bacterial load among RST mice, with no difference from control after 24h. The effect was sustained 5 days post-wounding, in RST mice treated with KSLW-F68. Temporal analysis of gene induction revealed reversals of stress-induced altered expression of growth factors, proinflammatory cytokines, and chemokines essential for favorable wound healing, at various time points. KSLW-treatment in RST mice demonstrated faster wound closure throughout the stress period. KSLW, at micromolar concentrations, demonstrated a significant effect on neutrophil migration and oxidative burst. These data suggest KSLW enhances bacterial clearance and promotes proinflammatory activity during early wound healing in stressed mice. Peptide delivery in Pluronic-F68 demonstrated increased substantivity, with faster wound closure, compared to other delivery systems. In addition to its antimicrobial activity, KSLW was shown to enhance neutrophil chemotaxis and sustain cell viability by inhibition of oxidative burst responses. Taken together, the cationic peptide may be implicated in the management of infection in different systems demonstrating impaired healing, including diabetes, age, hormone-imbalance, and bum models.
1992-11-27
for 10 construction pr~n’jcts for realigning Carswell AFB was not adeauately documented as required by Air Force Regulation (AFR) 86-1, " Programming ...Engineering Programming , Standard Facility Requirements." paragraph 24-70, allows for a total of 25,200 square feet of space for tne warehouse and...cantonment area, and replaced an existing capability. The fact that a replacement wash rack was previously programmed does not alter this requirement
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-01-01
This decision document presents the selected remedial action for Site 5 Landfill Contents and Surface Soil at the Allegany Ballistics Laboratory (ABL), Rocket Center, West Virginia. The major components of the selected remedy are: Deed notation along with property use and limited access restrictions; Installation of a composite CAP-GCL and FMC; Installation of a drainage layer utilizing a geonet; Installation of a passive landfill gas (LFG) venting system; Revegetation of the capped area; Installation of perimeter drainage system; and Post-closure requirements.
Hemipelvectomy for trauma: case report.
Smith, R. J.
1991-01-01
This report documents a patient with an open pelvic fracture with gross contamination and partial avulsion of soft tissues with transection of femoral artery and vein, femoral nerve, and a stretch injury to the sciatic nerve. Initially, an attempt was made to treat with above-knee amputation, but due to massive soft tissue loss, this was not feasible. A left hemipelvectomy was done with closure of the wound. The patient required 14 units of blood. He was discharged and is now ambulatory with a prosthesis. Images Figure 1 Figure 2 Figure 6 PMID:2038088
Rupture loop annex ion exchange RLAIX vault deactivation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ham, J.E.; Harris, D.L., Westinghouse Hanford
This engineering report documents the deactivation, stabilization and final conditions of the Rupture Loop Annex Ion Exchange (RLAIX) Vault located northwest of the 309 Building`s Plutonium Recycle Test Reactor (PRTR). Twelve ion exchange columns, piping debris, and column liquid were removed from the vault, packaged and shipped for disposal. The vault walls and floor were decontaminated, and portions of the vault were painted to fix loose contamination. Process piping and drains were plugged, and the cover blocks and rain cover were installed. Upon closure,the vault was empty, stabilized, isolated.
U.S. Army Base Closure Program, Final Decision Document, Cameron Station, Alexandria, Virginia
1993-11-01
POTENTIAL CONCERN AT THE CAMERON STATION SITE TABLE 2-7 CHEMICALS CONTRIBUTING TO EXCESS CANCER RISK AT A PATHWAY LEVEL OF 1E-6 OR GREATER TABLE 2-8...CANCER RISK AT A PATHWAY LEVEL OF 1E-6 OR GREATER TABLE 2-8 SUMMARY OF DETAILED ANALYSIS OU-1 PCB TRANSFORMER SERVICE, STORAGE AND SPILL AREAS TABLE 2-9...Restrictions MCL Maximum Contaminant Level mg milligram 3001riOOh:bfsrod~acronyms.Ri November 18, 1993 v LIST OF ACRONYMS AND ABBREVIATIONS, CONTINUED O&M
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, R.
This report documents the initial progress on the reduced-order flow model developments in SAM for thermal stratification and mixing modeling. Two different modeling approaches are pursued. The first one is based on one-dimensional fluid equations with additional terms accounting for the thermal mixing from both flow circulations and turbulent mixing. The second approach is based on three-dimensional coarse-grid CFD approach, in which the full three-dimensional fluid conservation equations are modeled with closure models to account for the effects of turbulence.
Role of nitric oxide in regulating stomatal apertures
Ribeiro, Dimas M; Bright, Jo; Confraria, Ana; Harrison, Judith; Barros, Raimundo S; Desikan, Radhika; Neill, Steven J; Hancock, John T
2009-01-01
During stomatal closure, nitric oxide (NO) operates as one of the key intermediates in the complex, abscisic acid (ABA)-mediated, guard cell signaling network that regulates this process. However, data concerning the role of NO in stomatal closure that occurs in turgid vs. dehydrated plants is limited. The data presented demonstrate that, while there is a requirement for NO during the ABA-induced stomatal closure of turgid leaves, such a requirement does not exist for ABA-enhanced stomatal closure observed to occur during conditions of rapid dehydration. The data also indicate that the ABA signaling pathway must be both functional and to some degree activated for guard cell NO signaling to occur. These observations are in line with the idea that the effects of NO in guard cells are mediated via a Ca2+-dependent rather than a Ca2+-independent ABA signaling pathway. It appears that there is a role for NO in the fine tuning of the stomatal apertures of turgid leaves that occurs in response to fluctuations in the prevailing environment. PMID:19816112
40 CFR 265.228 - Closure and post-closure care.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...
40 CFR 265.228 - Closure and post-closure care.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...
Minguet-Parramona, Carla; Wang, Yizhou; Hills, Adrian; Vialet-Chabrand, Silvere; Griffiths, Howard; Rogers, Simon; Lawson, Tracy; Lew, Virgilio L; Blatt, Michael R
2016-01-01
Oscillations in cytosolic-free Ca(2+) concentration ([Ca(2+)]i) have been proposed to encode information that controls stomatal closure. [Ca(2+)]i oscillations with a period near 10 min were previously shown to be optimal for stomatal closure in Arabidopsis (Arabidopsis thaliana), but the studies offered no insight into their origins or mechanisms of encoding to validate a role in signaling. We have used a proven systems modeling platform to investigate these [Ca(2+)]i oscillations and analyze their origins in guard cell homeostasis and membrane transport. The model faithfully reproduced differences in stomatal closure as a function of oscillation frequency with an optimum period near 10 min under standard conditions. Analysis showed that this optimum was one of a range of frequencies that accelerated closure, each arising from a balance of transport and the prevailing ion gradients across the plasma membrane and tonoplast. These interactions emerge from the experimentally derived kinetics encoded in the model for each of the relevant transporters, without the need of any additional signaling component. The resulting frequencies are of sufficient duration to permit substantial changes in [Ca(2+)]i and, with the accompanying oscillations in voltage, drive the K(+) and anion efflux for stomatal closure. Thus, the frequency optima arise from emergent interactions of transport across the membrane system of the guard cell. Rather than encoding information for ion flux, these oscillations are a by-product of the transport activities that determine stomatal aperture. © 2016 American Society of Plant Biologists. All Rights Reserved.
Minguet-Parramona, Carla; Hills, Adrian; Vialet-Chabrand, Silvere; Griffiths, Howard; Lawson, Tracy; Lew, Virgilio L.; Blatt, Michael R.
2016-01-01
Oscillations in cytosolic-free Ca2+ concentration ([Ca2+]i) have been proposed to encode information that controls stomatal closure. [Ca2+]i oscillations with a period near 10 min were previously shown to be optimal for stomatal closure in Arabidopsis (Arabidopsis thaliana), but the studies offered no insight into their origins or mechanisms of encoding to validate a role in signaling. We have used a proven systems modeling platform to investigate these [Ca2+]i oscillations and analyze their origins in guard cell homeostasis and membrane transport. The model faithfully reproduced differences in stomatal closure as a function of oscillation frequency with an optimum period near 10 min under standard conditions. Analysis showed that this optimum was one of a range of frequencies that accelerated closure, each arising from a balance of transport and the prevailing ion gradients across the plasma membrane and tonoplast. These interactions emerge from the experimentally derived kinetics encoded in the model for each of the relevant transporters, without the need of any additional signaling component. The resulting frequencies are of sufficient duration to permit substantial changes in [Ca2+]i and, with the accompanying oscillations in voltage, drive the K+ and anion efflux for stomatal closure. Thus, the frequency optima arise from emergent interactions of transport across the membrane system of the guard cell. Rather than encoding information for ion flux, these oscillations are a by-product of the transport activities that determine stomatal aperture. PMID:26628748
Escalante-Pérez, María; Krol, Elzbieta; Stange, Annette; Geiger, Dietmar; Al-Rasheid, Khaled A. S.; Hause, Bettina; Neher, Erwin; Hedrich, Rainer
2011-01-01
Venus flytrap's leaves can catch an insect in a fraction of a second. Since the time of Charles Darwin, scientists have struggled to understand the sensory biology and biomechanics of this plant, Dionaea muscipula. Here we show that insect-capture of Dionaea traps is modulated by the phytohormone abscisic acid (ABA) and jasmonates. Water-stressed Dionaea, as well as those exposed to the drought-stress hormone ABA, are less sensitive to mechanical stimulation. In contrast, application of 12-oxo-phytodienoic acid (OPDA), a precursor of the phytohormone jasmonic acid (JA), the methyl ester of JA (Me-JA), and coronatine (COR), the molecular mimic of the isoleucine conjugate of JA (JA-Ile), triggers secretion of digestive enzymes without any preceding mechanical stimulus. Such secretion is accompanied by slow trap closure. Under physiological conditions, insect-capture is associated with Ca2+ signaling and a rise in OPDA, Apparently, jasmonates bypass hapto-electric processes associated with trap closure. However, ABA does not affect OPDA-dependent gland activity. Therefore, signals for trap movement and secretion seem to involve separate pathways. Jasmonates are systemically active because application to a single trap induces secretion and slow closure not only in the given trap but also in all others. Furthermore, formerly touch-insensitive trap sectors are converted into mechanosensitive ones. These findings demonstrate that prey-catching Dionaea combines plant-specific signaling pathways, involving OPDA and ABA with a rapidly acting trigger, which uses ion channels, action potentials, and Ca2+ signals. PMID:21896747
Escalante-Pérez, María; Krol, Elzbieta; Stange, Annette; Geiger, Dietmar; Al-Rasheid, Khaled A S; Hause, Bettina; Neher, Erwin; Hedrich, Rainer
2011-09-13
Venus flytrap's leaves can catch an insect in a fraction of a second. Since the time of Charles Darwin, scientists have struggled to understand the sensory biology and biomechanics of this plant, Dionaea muscipula. Here we show that insect-capture of Dionaea traps is modulated by the phytohormone abscisic acid (ABA) and jasmonates. Water-stressed Dionaea, as well as those exposed to the drought-stress hormone ABA, are less sensitive to mechanical stimulation. In contrast, application of 12-oxo-phytodienoic acid (OPDA), a precursor of the phytohormone jasmonic acid (JA), the methyl ester of JA (Me-JA), and coronatine (COR), the molecular mimic of the isoleucine conjugate of JA (JA-Ile), triggers secretion of digestive enzymes without any preceding mechanical stimulus. Such secretion is accompanied by slow trap closure. Under physiological conditions, insect-capture is associated with Ca(2+) signaling and a rise in OPDA, Apparently, jasmonates bypass hapto-electric processes associated with trap closure. However, ABA does not affect OPDA-dependent gland activity. Therefore, signals for trap movement and secretion seem to involve separate pathways. Jasmonates are systemically active because application to a single trap induces secretion and slow closure not only in the given trap but also in all others. Furthermore, formerly touch-insensitive trap sectors are converted into mechanosensitive ones. These findings demonstrate that prey-catching Dionaea combines plant-specific signaling pathways, involving OPDA and ABA with a rapidly acting trigger, which uses ion channels, action potentials, and Ca(2+) signals.
Tan, Peter S; Perry, Matthew D; Ng, Chai Ann; Vandenberg, Jamie I; Hill, Adam P
2012-09-01
Human ether-a-go-go-related gene (hERG) potassium channels exhibit unique gating kinetics characterized by unusually slow activation and deactivation. The N terminus of the channel, which contains an amphipathic helix and an unstructured tail, has been shown to be involved in regulation of this slow deactivation. However, the mechanism of how this occurs and the connection between voltage-sensing domain (VSD) return and closing of the gate are unclear. To examine this relationship, we have used voltage-clamp fluorometry to simultaneously measure VSD motion and gate closure in N-terminally truncated constructs. We report that mode shifting of the hERG VSD results in a corresponding shift in the voltage-dependent equilibrium of channel closing and that at negative potentials, coupling of the mode-shifted VSD to the gate defines the rate of channel closure. Deletion of the first 25 aa from the N terminus of hERG does not alter mode shifting of the VSD but uncouples the shift from closure of the cytoplasmic gate. Based on these observations, we propose the N-terminal tail as an adaptor that couples voltage sensor return to gate closure to define slow deactivation gating in hERG channels. Furthermore, because the mode shift occurs on a time scale relevant to the cardiac action potential, we suggest a physiological role for this phenomenon in maximizing current flow through hERG channels during repolarization.
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring. In 2011, DRI installed two meteorological monitoring stations south (station #1) and north (station #2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters are recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2015.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2003, Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 02-37-01, Cellar & Mud Pit • CAS 02-37-03, Cellar & Mud Pit • CAS 02-37-04, Cellar & Mud Pit • CAS 02-37-05, Cellar & Mud Pit • CAS 02-37-06, Cellar & Mud Pit • CAS 02-37-07, Cellar & Mud Pit • CAS 02-37-10, Cellar & Mud Pit • CAS 02-37-11, Cellar & Mud Pit • CAS 02-37-12, Cellar & Mud Pit • CAS 02-37-13, Cellar & Mud Pit • CAS 02-37-14, Cellar & Mud Pit • CAS 02-37-15, Cellar & Mud Pit • CAS 02-37-16, Cellar & Mud Pit • CAS 02-37-17, Cellar • CAS 02-37-18, Cellar & Tanks These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Cormier, Olga; Mohseni, Nilufar; Voytyuk, Iryna; Reed, Bruce H
2012-02-01
During Drosophila embryogenesis the majority of the extra-embryonic epithelium known as the amnioserosa (AS) undergoes programmed cell death (PCD) following the completion of the morphogenetic process of dorsal closure. Approximately ten percent of AS cells, however, are eliminated during dorsal closure by extrusion from the epithelium. Using biosensors that report autophagy and caspase activity in vivo, we demonstrate that AS cell extrusion occurs in the context of elevated autophagy and caspase activation. Furthermore, we evaluate AS extrusion rates, autophagy, and caspase activation in embryos in which caspase activity or autophagy are altered by genetic manipulation. This includes using the GAL4/UAS system to drive expression of p35, reaper, dINR (ACT) and Atg1 in the AS; we also analyze embryos lacking both maternal and zygotic expression of Atg1. Based on our results we suggest that autophagy can promote, but is not required for, epithelial extrusion and caspase activation in the amnioserosa.
40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... assurance of both closure and post-closure care. 264.146 Section 264.146 Protection of Environment... mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more...
Baba, Atsunori; Matsushita, Shigeto; Kitayama, Kasumi; Asakura, Tetsuo; Sezutsu, Hideki; Tanimoto, Akihide; Kanekura, Takuro
2018-03-04
We investigated the effect of silk fibroin (SF) on wound healing in mice. SF or an amorphous SF film (ASFF) prepared from silk produced by the wild-type silkworm Bombyx mori (WT-SF, WT-ASFF) or by transgenic worms that overexpress the Arg-Gly-Asp (RGD) sequence (TG-SF, TG-ASFF) was placed on 5-mm diameter full-thickness skin wounds made by biopsy punch on the back of 8-12 week-old BALB/c mice. Each wound was covered with WT-ASFF and urethane film (UF), TG-ASFF plus UF, or UF alone (control). Wound closure, histological thickness, the area of granulation tissue, and neovascularization were analyzed 4, 8, and 12 days later. The effect of SF on cell migration and proliferation was examined in vitro by scratch- and MTT-assay using human dermal fibroblasts. Wound closure was prompted by TG-ASFF, granulation tissue was thicker and larger in ASFF-treated wounds than the control, and neovascularization was promoted significantly by WT-ASFF. Both assays showed that SF induced the migration and proliferation of human dermal fibroblasts. The effects of TG-ASFF and TG-SF on wound closure, granulation formation, and cell proliferation were more profound than that of WT-ASFF and WT-SF. We document that SF accelerates cutaneous wound healing, and this effect is enhanced with TG-SF. © 2018 Wiley Periodicals, Inc. J Biomed Mater Res Part B: Appl Biomater, 2018. © 2018 Wiley Periodicals, Inc.
Two-port robotic hysterectomy: a novel approach.
Moawad, Gaby N; Tyan, Paul; Khalil, Elias D Abi
2018-03-24
The objective of the study was to demonstrate a novel technique for two-port robotic hysterectomy with a particular focus on the challenging portions of the procedure. The study is designed as a technical video, showing step-by-step a two-port robotic hysterectomy approach (Canadian Task Force classification level III). IRB approval was not required for this study. The benefits of minimally invasive surgery for gynecological pathology have been clearly documented in multiple studies. Patients had fewer medical and surgical complications postoperatively, better cosmesis and quality of life. Most gynecological surgeons require 3-5 ports for the standard gynecological procedure. Even though the minimally invasive multiport system provides an excellent safety profile, multiple incisions are associated with a greater risk for morbidity including infection, pain, and hernia. In the past decade, various new methods have emerged to minimize the number of ports used in gynecological surgery. The interventions employed were a two-port robotic hysterectomy, using a camera port plus one robotic arm, with a focus on salpingectomy and cuff closure. We describe a transvaginal and a transabdominal approach for salpingectomy and a novel method for cuff closure. The transvaginal and transabdominal techniques for salpingectomy for two-port robotic-assisted hysterectomy provide excellent tension and exposure for a safe procedure without the need for an extra port. We also describe a transvaginal technique to place the vaginal cuff on tension during closure. With the necessary set of skills on a carefully chosen patient, two-port robotic-assisted total laparoscopic hysterectomy is a feasible procedure.
Pulmonary artery dissection in eight dogs with patent ductus arteriosus.
Scansen, Brian A; Simpson, Elaine M; López-Alvarez, Jordi; Thomas, William P; Bright, Janice M; Eason, Bryan D; Rush, John E; Dukes-McEwan, Joanna; Green, Henry W; Cunningham, Suzanne M; Visser, Lance C; Kent, Agnieszka M; Schober, Karsten E
2015-06-01
To describe a series of dogs with pulmonary artery dissection and patent ductus arteriosus (PDA). Eight dogs. Retrospective case series. Pulmonary artery dissection was diagnosed in 8 dogs, 3 were Weimaraners. Four dogs presented in left-sided congestive heart failure, 4 presented for murmur evaluation and without clinical signs, and 1 presented in right-sided congestive heart failure. In 7 dogs the dissection was first documented concurrent with a diagnosis of uncorrected PDA. In the other dog, with pulmonary valve stenosis and PDA, the dissection was observed on autopsy examination 17 months after balloon pulmonary valvuloplasty and ductal closure. Median age at presentation for the 7 dogs with antemortem diagnosis of pulmonary artery dissection was 3.5 years (range, 1.5-4 years). Three dogs had the PDA surgically ligated, 2 dogs did not undergo PDA closure, 1 dog failed transcatheter occlusion of the PDA with subsequent surgical ligation, 1 dog underwent successful transcatheter device occlusion of the PDA, and 1 dog had the PDA closed by transcatheter coil delivery 17 months prior to the diagnosis of pulmonary artery dissection. The 2 dogs that did not have the PDA closed died 1 and 3 years after diagnosis due to heart failure. Pulmonary artery dissection is a potential complication of PDA in dogs, the Weimaraner breed may be at increased risk, presentation is often in mature dogs, and closure of the PDA can be performed and appears to improve outcome. Copyright © 2014 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giansante Abud, Daniel; Mounayer, Charbel; Saint-Maurice, Jean Pierre
We report 2 cases of hemorrhagic complications related to use of the Angio-Seal hemostatic closure device that were successfully managed with stent-grafts. Two patients with subarachnoid hemorrhage were referred to our departments for endovascular treatment of ruptured intracranial aneurysms. The treatment was performed through a femoral access; the sheaths were removed immediately after the procedures, and the punctures sites closed by Angio-Seals. Both patients presented clinical signs of hypovolemic shock after treatment. The diagnosis of active bleeding through the puncture site was made by emergency digital subtraction angiography. The lesions were managed with stent-grafts. The use of stent-grafts proved tomore » be efficient in the management of these life-threatening hemorrhagic complications following the use of the Angio-Seal hemostatic closure device.« less
Border Forces and Friction Control Epithelial Closure Dynamics
Cochet-Escartin, Olivier; Ranft, Jonas; Silberzan, Pascal; Marcq, Philippe
2014-01-01
We study the closure dynamics of a large number of well-controlled circular apertures within an epithelial monolayer, where the collective cell migration responsible for epithelization is triggered by the removal of a spatial constraint rather than by scratching. Based on experimental observations, we propose a physical model that takes into account border forces, friction with the substrate, and tissue rheology. Border protrusive activity drives epithelization despite the presence of a contractile actomyosin cable at the periphery of the wound. The closure dynamics is quantified by an epithelization coefficient, defined as the ratio of protrusive stress to tissue-substrate friction, that allows classification of different phenotypes. The same analysis demonstrates a distinct signature for human cells bearing the oncogenic RasV12 mutation, demonstrating the potential of the approach to quantitatively characterize metastatic transformations. PMID:24411238
40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.
Code of Federal Regulations, 2013 CFR
2013-07-01
... assurance of both closure and post-closure care. 265.146 Section 265.146 Protection of Environment... Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or...
Miller, Julia; Dreyer, Tobias F.; Bächer, Anne Sophie; Sinner, Eva-Kathrin; Heinrich, Christine; Benge, Anke; Gross, Eva; Preis, Sarah; Rother, Jan; Roberts, Anthony; Nelles, Gabriele; Miteva, Tzenka; Reuning, Ute
2018-01-01
The tetraspanin and tumor suppressor KAI1 is downregulated or lost in many cancers which correlates with poor prognosis. KAI1 acts via physical/functional crosstalk with other membrane receptors. Also, a splice variant of KAI1 (KAI1-SP) has been identified indicative of poor prognosis. We here characterized differential effects of the two KAI1 variants on tumor biological events involving integrin (αvß3) and/or epidermal growth factor receptor (EGF-R). In MDA-MB-231 and -435 breast cancer cells, differential effects were documented on the expression levels of the tumor biologically relevant integrin αvß3 which colocalized with KAI1-WT but not with KAI1-SP. Cellular motility was assessed by video image processing, including motion detection and vector analysis for the quantification and visualization of cell motion parameters. In MDA-MB-231 cells, KAI1-SP provoked a quicker wound gap closure and higher closure rates than KAI1-WT, also reflected by different velocities and average motion amplitudes of singular cells. KAI1-SP induced highest cell motion adjacent to the wound gap borders, whereas in MDA-MB-435 cells a comparable induction of both KAI1 variants was noticed. Moreover, while KAI1-WT reduced cell growth, KAI1-SP significantly increased it going along with a pronounced EGF-R upregulation. KAI1-SP-induced cell migration and proliferation was accompanied by the activation of the focal adhesion and Src kinase. Our findings suggest that splicing of KAI1 does not only abrogate its tumor suppressive functions, but even more, promotes tumor biological effects in favor of cancer progression and metastasis. PMID:29464079
Pelissero, Elisa; Giuggia, Marco; Todaro, Maria Chiara; Trapani, Giuseppe; Giordano, Benedetta; Senatore, Gaetano
2017-12-01
We evaluated long-term safety and efficacy of concomitant left atrial appendage (LAA) closure and atrial fibrillation (AF) ablation. From February 2013 to June 2017, all patients referred for AF ablation and LAA closure (group 1) were enrolled in the study and compared with a matched control group undergoing AF ablation only (group 2). Pulmonary vein isolation was achieved in all cases with radiofrequency or cryoballoon. LAA was occluded with Watchman or Amplatzer Cardiac Plug or Amulet (ACP) devices. All patients were treated with oral anticoagulation therapy for at least 3 months after the procedure ("blanking period"), and then switched to dual antiplatelet therapy with aspirin and clopidogrel for other 3 months, and then to single antiplatelet therapy with aspirin in case of LAA closure, while group 2 was treated with long-term oral anticoagulation therapy according to CHA2DS2-VASc score. Follow-up was performed with transesophageal echocardiography and clinical visit at 3, 6 and 12 months after the procedure. AF burden was evaluated by loop recorder or pacemaker interrogation in all patients. Overall, 42 patients were enrolled, 21 in each group. Mean age was 66.86 ± 10.35 years in group 1 vs 68.42 ± 10.61 in group 2 (p=NS); mean CHA2DS2-VASc score was 2.8 ± 1.22 in group 1 vs 2.01 ± 0.93 in group 2 (p=NS), mean HAS-BLED score was 3.2 ± 0.83 in group 1 vs 3.1 ± 0.95 in group 2 (p=NS). Persistent AF was present in 80% of patients in group 1 and in 85% in group 2. LAA closure was successful in all cases (14 Watchman, 7 ACP devices). Procedural and fluoroscopy times were shorter in group 2 (68 ± 17 vs 52 ± 15 min, p <0.05; 23 ± 5 vs 18 ± 3 min, p <0.05, respectively). No procedural complications were observed in group 2, while in group 1 one case of self-terminating pericardial effusion and one arteriovenous fistula were observed. At a mean follow-up of 14.93 ± 10.05 months, complete seal of LAA was documented in all patients, with neither dislocations nor thromboembolic events. Similarly, no long-term complications were observed in group 2. Maintenance of sinus rhythm was overlapping, with an AF relapse rate of 36% in group 1 vs 38% in group 2 (p=NS). Combined LAA percutaneous closure and AF ablation appears to be feasible in high-risk patients.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ansley, Shannon Leigh
2002-02-01
The Idaho Nuclear Technology and Engineering Center (INTEC) Service Wastewater Discharge Facility replaces the existing percolation ponds as a disposal facility for the INTEC Service Waste Stream. A preferred alternative for helping decrease water content in the subsurface near INTEC, closure of the existing ponds is required by the INTEC Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for Waste Area Group 3 Operable Unit 3-13 (DOE-ID 1999a). By August 2002, the replacement facility was constructed approximately 2 miles southwest of INTEC, near the Big Lost River channel. Because groundwater beneath the Idaho National Engineering andmore » Environmental Laboratory (INEEL) is protected under Federal and State of Idaho regulations from degradation due to INEEL activities, preoperational data required by U.S. Department of Energy (DOE) Order 5400.1 were collected. These data include preexisting physical, chemical, and biological conditions that could be affected by the discharge; background levels of radioactive and chemical components; pertinent environmental and ecological parameters; and potential pathways for human exposure or environmental impact. This document presents specific data collected in support of DOE Order 5400.1, including: four quarters of groundwater sampling and analysis of chemical and radiological parameters; general facility description; site specific geology, stratigraphy, soils, and hydrology; perched water discussions; and general regulatory requirements. However, in order to avoid duplication of previous information, the reader is directed to other referenced publications for more detailed information. Documents that are not readily available are compiled in this publication as appendices. These documents include well and borehole completion reports, a perched water evaluation letter report, the draft INEEL Wellhead Protection Program Plan, and the Environmental Checklist.« less
Geochemical Data Package for Performance Assessment Calculations Related to the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaplan, Daniel I.
The Savannah River Site (SRS) disposes of low-level radioactive waste (LLW) and stabilizes high-level radioactive waste (HLW) tanks in the subsurface environment. Calculations used to establish the radiological limits of these facilities are referred to as Performance Assessments (PA), Special Analyses (SA), and Composite Analyses (CA). The objective of this document is to revise existing geochemical input values used for these calculations. This work builds on earlier compilations of geochemical data (2007, 2010), referred to a geochemical data packages. This work is being conducted as part of the on-going maintenance program of the SRS PA programs that periodically updates calculationsmore » and data packages when new information becomes available. Because application of values without full understanding of their original purpose may lead to misuse, this document also provides the geochemical conceptual model, the approach used for selecting the values, the justification for selecting data, and the assumptions made to assure that the conceptual and numerical geochemical models are reasonably conservative (i.e., bias the recommended input values to reflect conditions that will tend to predict the maximum risk to the hypothetical recipient). This document provides 1088 input parameters for geochemical parameters describing transport processes for 64 elements (>740 radioisotopes) potentially occurring within eight subsurface disposal or tank closure areas: Slit Trenches (ST), Engineered Trenches (ET), Low Activity Waste Vault (LAWV), Intermediate Level (ILV) Vaults, Naval Reactor Component Disposal Areas (NRCDA), Components-in-Grout (CIG) Trenches, Saltstone Facility, and Closed Liquid Waste Tanks. The geochemical parameters described here are the distribution coefficient, Kd value, apparent solubility concentration, k s value, and the cementitious leachate impact factor.« less
Assessment of MSIV full closure for Santa Maria de Garona Nuclear Power Plant using TRAC-BF1 (G1J1)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crespo, J.L.; Fernandez, R.A.
1993-06-01
This document presents a spurious Main Steam Isolation Value (MSIV) closure analysis for Santa Maria de Garorta Nuclear Power Plan describing the problems found when comparing calculated and real data. The plant is a General Electric Boiling Water Reactor 3, containment type Mark 1. It is operated by NUCLENOR, S.A. and was connected to the grid in 1971. The analysis has been performed by the Apphed Physics Department from the University of Cantabria and the Analysis and Operation Section from NUCLENOR, S.A. as a part of an agreement for developing an engineering simulator of operational transients and accidents for Santamore » Maria de Gamma Power Plant. The analysis was performed using the frozen version of TRAC-BFI (GlJl) code and is the second of two NUCLENOR contributions to the International Code Applications and Assessment Program (ICAP). The code was run in a Cyber 932 with operating system NOS/VE, property of NUCLENOR, S.A.. A programming effort was carried out in order to provide suitable graphics from the output file.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lopez, Jesse E.; Baptista, António M.
A sediment model coupled to the hydrodynamic model SELFE is validated against a benchmark combining a set of idealized tests and an application to a field-data rich energetic estuary. After sensitivity studies, model results for the idealized tests largely agree with previously reported results from other models in addition to analytical, semi-analytical, or laboratory results. Results of suspended sediment in an open channel test with fixed bottom are sensitive to turbulence closure and treatment for hydrodynamic bottom boundary. Results for the migration of a trench are very sensitive to critical stress and erosion rate, but largely insensitive to turbulence closure.more » The model is able to qualitatively represent sediment dynamics associated with estuarine turbidity maxima in an idealized estuary. Applied to the Columbia River estuary, the model qualitatively captures sediment dynamics observed by fixed stations and shipborne profiles. Representation of the vertical structure of suspended sediment degrades when stratification is underpredicted. Across all tests, skill metrics of suspended sediments lag those of hydrodynamics even when qualitatively representing dynamics. The benchmark is fully documented in an openly available repository to encourage unambiguous comparisons against other models.« less
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2013-01-28
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)
Battlefield scrotal trauma: how should it be managed in a deployed military hospital?
Williams, R J; Fries, C A; Midwinter, M; Lambert, A W
2013-09-01
There is little documented advice on the management of scrotal trauma sustained in combat. This paper reviews this injury, its present surgical management and makes recommendations for the future. All UK forces sustaining scrotal injuries between 2003 and 2009, in Iraq and Afghanistan, initially treated at a Role 2 (enhanced) or Role 3 deployed military surgical facility were identified from the Joint Theatre Trauma Registry. The cause and extent of the injury, in addition to the surgical management, are reported. Twenty-seven patients sustained trauma to their scrotum; improvised explosive device (IED) (n=21), mine (n=3), rocket propeller grenade (RPG) (n=2), mortar round (n=1). Of those injured by an IED, eleven had traumatic orchidectomies, of which 4 were bilateral, one received fragmentation wounds to the scrotum with a testicular injury that was salvaged and there were six scrotal fragmentation wounds not associated with a testicular injury. Scrotal exploration was performed with testicular salvage in all cases involving mortar, RPG or mines. For all aetiologies the scrotum was debrided with primary closure over a drain (n=7), debridement and subsequent delayed primary closure (DPC) (n=4) or healing by secondary intension (n=6). Skin grafts were applied in two cases of traumatic bilateral orchidectomy. To date there have been two cases of delayed orchidectomy; chronic pain and delayed presentation of a disrupted testis. All reported patients survived. The established principles of debridement should be the mainstay of treatment. Testicular ischaemia, a consequence of cord transaction, necessitates orchidectomy. Salvage of the disrupted testis, with debridement and closure of the tunica rather than orchidectomy, should be performed whenever possible, particularly when there is significant bilateral testicular injury. Scrotal wounds can be treated by closure over a drain, DPC or healing by secondary intention. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minko, Peter, E-mail: peterminko@yahoo.com; Katoh, Marcus; Graeber, Stefan
Purpose: This study was designed to investigate the efficacy of the AngioSeal vascular closure device after antegrade puncture of the femoral artery. Methods: In a prospective study, 120 consecutive patients underwent lower limb vascular intervention by an antegrade access to the common femoral artery (CFA). After intervention, a 6F (n = 88) or an 8F (n = 32) AngioSeal vascular closure device was used to achieve hemostasis. The technical success or the cause of failure was documented. In addition, the coagulation status (platelets, INR, prothrombin time, atrial thromboplastin time (PTT)), hypertonus, locoregional habitus of the groin, body mass index (BMI),more » presence of calcifications, and history of previous surgical interventions of the CFA were evaluated. Results: Hemostasis was achieved in 97 patients (81%). In 12 patients (10%), persistent bleeding of the puncture site required manual compression. In another nine patients (8%) a kink of the sheath obviated the passage of the collagen plug toward the vessel, and in two patients the anchor dislodged out of the vessel, requiring manual compression. There were no significant differences between the groups of successful and unsuccessful sealing regarding the mean platelets (241 vs. 254 * 10{sup 9}/l; P = 0.86), INR (1.06 vs. 1.02; P = 0.52), prothrombin time (90% vs. 90%; P = 0.86), and PTT (30 vs. 31 s; P = 0.82). However, unsuccessful sealing was more likely in obese patients with an increased BMI (26.6 vs. 28.8 kg/m{sup 2}; P = 0.04). Conclusions: Obesity seems to be an independent risk factor for insufficient sealing using the AngioSeal vascular closure device after antegrade puncture of the CFA. In 8% of our patients, hemostasis could not be achieved due to kink of the flexible sheath.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.
2013-03-18
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less
Lertsapcharoen, Pornthep; Khongphatthanayothin, Apichai; La-orkhun, Vidhavas; Supachokchaiwattana, Pentip; Charoonrut, Phingphol
2006-01-01
Our purpose was to evaluate self-expanding nanoplatinum-coated nitinol devices for transcatheter closure of atrial septal defects and patent ductus arteriosus in a swine model. The devices were braided from platinum-activated nitinol wires and filled with polyester to enhance thrombogenicity. The platinum activation of the nitinol wires was carried out with the help of Nanofusion technology. The coating of platinum covers the exposed surface of the nitinol wires and prevents the release of nickel into the blood stream after the implantation of the device but does not affect its shape memory, which makes the device self-expanding after it is loaded from the catheter. Atrial septal defects were created in 12 piglets by balloon dilation of the patent foramen ovale. The size of the device was selected on the basis of the diameter of the balloon and the size of the defect, measured by transthoracic echocardiography. The devices were successfully deployed in all 12 piglets under fluoroscopic study. Transthoracic color Doppler echocardiograms showed complete closure of the atrial septal defect within 15 minutes of device implantation. Twelve patent ductus arteriosus closure devices were deployed in the right or left subclavian arteries in 10 piglets. Angiograms showed complete occlusion of the subclavian arteries within a few minutes of device deployment. In the atrial septal defect cases, the autopsy findings showed complete organizing fibrin thrombus formation and complete neo-endothelialization on the outer surface of the devices within one week and six weeks of implantation, respectively. The use of self-expanding nanoplatinum-coated nitinol devices for the transcatheter closure of atrial septal defects and patent ductus arteriosus is feasible. The excellent occlusion result and complete neo-endothelialization of the devices in the swine model is an indication of the potential of these devices in human application.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1997-02-25
1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less
Sabbag, Anelise; Denadai, Rafael; Raposo-Amaral, Cesar Augusto; Buzzo, Celso Luiz; Raposo-Amaral, Cassio Eduardo; Nagae, Mirian H
2018-05-14
To assess the electromyographic activity of the masseter and temporal muscles in cleft patients who underwent 1-stage palate repair versus 2-stage palate repair. Thirty-two patients with nonsyndromic complete unilateral cleft lip and palate operated by 2 different protocols for palate repair, 1-stage (group 1, n = 16) versus 2-stage with delayed hard palate closure (group 2, n = 16) were available in the retrospective longitudinal study. Standardized electromyographic records of the masseter and anterior portion of temporal muscles were obtained with 2 repetitions during mastication and rest. No statistically significant (all P > 0.05) differences were observed in the electromyographic data between the groups 1 and 2. There were similar electromyographic activity of masseter and temporal muscles during mastication and at rest after 1- and 2-stage palate closure.
NASA Technical Reports Server (NTRS)
Hitchman, Matthew H.; Brasseur, Guy
1988-01-01
A parameterization of the effects of Rossby waves in the middle atmosphere is proposed for use in two-dimensional models. By adding an equation for conservation of Rossby wave activity, closure is obtained for the meridional eddy fluxes and body force due to Rossby waves. Rossby wave activity is produced in a climatological fashion at the tropopause, is advected by a group velocity which is determined solely by model zonal winds, and is absorbed where it converges. Absorption of Rossby wave activity causes both an easterly torque and an irreversible mixing of potential vorticity, represented by the meridional eddy diffusivity, K(yy). The distribution of Rossby wave driving determines the distribution of K(yy), which is applied to all of the chemical constituents. This provides a self-consistent coupling of the wave activity with the winds, tracer distributions and the radiative field. Typical winter stratospheric values for K(yy) of 2 million sq m/sec are obtained. Poleward tracer advection is enhanced and meridional tracer gradients are reduced where Rossby wave activity is absorbed in the model.
Sung, Nuri; Lee, Jungsoon; Kim, Ji-Hyun; Chang, Changsoo; Joachimiak, Andrzej; Lee, Sukyeong; Tsai, Francis T. F.
2016-01-01
Heat-shock protein of 90 kDa (Hsp90) is an essential molecular chaperone that adopts different 3D structures associated with distinct nucleotide states: a wide-open, V-shaped dimer in the apo state and a twisted, N-terminally closed dimer with ATP. Although the N domain is known to mediate ATP binding, how Hsp90 senses the bound nucleotide and facilitates dimer closure remains unclear. Here we present atomic structures of human mitochondrial Hsp90N (TRAP1N) and a composite model of intact TRAP1 revealing a previously unobserved coiled-coil dimer conformation that may precede dimer closure and is conserved in intact TRAP1 in solution. Our structure suggests that TRAP1 normally exists in an autoinhibited state with the ATP lid bound to the nucleotide-binding pocket. ATP binding displaces the ATP lid that signals the cis-bound ATP status to the neighboring subunit in a highly cooperative manner compatible with the coiled-coil intermediate state. We propose that TRAP1 is a ligand-activated molecular chaperone, which couples ATP binding to dramatic changes in local structure required for protein folding. PMID:26929380
Penney, Andrew J.; Guinotte, John M.
2013-01-01
United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas. PMID:24358162