Sample records for closure work plan

  1. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  2. Feasibility of lane closures using probe data : technical brief.

    DOT National Transportation Integrated Search

    2017-04-01

    This study developed an on-line system analysis tool called the Work Zone Interactive : Management Application - Planning (WIMAP-P), an easy-to-use and easy-to-learn tool for : predicting the traffic impact caused by work zone lane closures on freewa...

  3. RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.

    DTIC Science & Technology

    1989-05-01

    20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION

  4. School closure as an influenza mitigation strategy: how variations in legal authority and plan criteria can alter the impact.

    PubMed

    Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S

    2012-11-14

    States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.

  5. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  6. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  7. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  8. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  9. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  10. Integrated capabilities in heavy vehicles : human factors research needs

    DOT National Transportation Integrated Search

    2003-10-09

    The Full Road Closure method uses facility closure and total traffic diversion, which may be for one direction or bi-directional traffic flow, to accelerate construction and reduce the negative impacts of work zones. With good planning, interagency c...

  11. RCRA, superfund and EPCRA hotline training module. Introduction to: Closure/post-closure (40 cfr parts 264/265, subpart g) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less

  12. A Tale of Many Cities: A Contemporary Historical Study of the Implementation of School Closures during the 2009 pA(H1N1) Influenza Pandemic

    PubMed Central

    Navarro, J. Alexander; Kohl, Katrin S.; Cetron, Martin S.; Markel, Howard

    2017-01-01

    Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. PMID:26921384

  13. A Tale of Many Cities: A Contemporary Historical Study of the Implementation of School Closures during the 2009 pA(H1N1) Influenza Pandemic.

    PubMed

    Navarro, J Alexander; Kohl, Katrin S; Cetron, Martin S; Markel, Howard

    2016-06-01

    Applying qualitative historical methods, we examined the consideration and implementation of school closures as a nonpharmaceutical intervention (NPI) in thirty US cities during the spring 2009 wave of the pA(H1N1) influenza pandemic. We gathered and performed close textual readings of official federal, state, and municipal government documents; media coverage; and academic publications. Lastly, we conducted oral history interviews with public health and education officials in our selected cities. We found that several local health departments pursued school closure plans independent of CDC guidance, that uncertainty of action and the rapidly evolving understanding of pA(H1N1) contributed to tension and pushback from the public, that the media and public perception played a significant role in the response to school closure decisions, and that there were some notable instances of interdepartmental communication breakdown. We conclude that health departments should continue to develop and fine-tune their action plans while also working to develop better communication methods with the public, and work more closely with education officials to better understand the complexities involved in closing schools. Lastly, state and local governments should work to resolve lingering issues of legal authority for school closures in times of public health crises. Copyright © 2016 by Duke University Press.

  14. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikolich, George; Mizell, Steve; McCurdy, Greg

    2017-10-01

    Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less

  15. Household responses to school closure resulting from outbreak of influenza B, North Carolina.

    PubMed

    Johnson, April J; Moore, Zack S; Edelson, Paul J; Kinnane, Lynda; Davies, Megan; Shay, David K; Balish, Amanda; McCarron, Meg; Blanton, Lenee; Finelli, Lyn; Averhoff, Francisco; Bresee, Joseph; Engel, Jeffrey; Fiore, Anthony

    2008-07-01

    School closure is a proposed strategy for reducing influenza transmission during a pandemic. Few studies have assessed how families respond to closures, or whether other interactions during closure could reduce this strategy's effect. Questionnaires were administered to 220 households (438 adults and 355 children) with school-age children in a North Carolina county during an influenza B virus outbreak that resulted in school closure. Closure was considered appropriate by 201 (91%) households. No adults missed work to solely provide childcare, and only 22 (10%) households required special childcare arrangements; 2 households incurred additional costs. Eighty-nine percent of children visited at least 1 public location during the closure despite county recommendations to avoid large gatherings. Although behavior and attitudes might differ during a pandemic, these results suggest short-term closure did not cause substantial hardship for parents. Pandemic planning guidance should address the potential for transmission in public areas during school closure.

  16. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  17. 100-D Ponds closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less

  18. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  19. Humid site stabilization and closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cutshall, N.H.

    1981-01-01

    The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less

  20. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathews, S.

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less

  1. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  2. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less

  3. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  4. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  5. Minimizing user delay and crash potential through highway work zone planning.

    DOT National Transportation Integrated Search

    2014-05-01

    Lane closures due to highway work zones introduce many challenges to ensuring smooth traffic operations and a : safe environment for drivers and workers. In addition, merging has been found to be one of the most stressful : aspects of driving and a m...

  6. 40 CFR 264.258 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...

  7. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  8. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  9. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less

  10. 77 FR 60319 - Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...

  11. 40 CFR 146.71 - Closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Injection Wells § 146.71 Closure. (a) Closure Plan. The owner or operator of a Class I hazardous waste injection well shall prepare, maintain, and comply with a plan for closure of the well that meets... of material to be used in plugging; (iv) The method of placement of the plugs; (v) Any proposed test...

  12. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  13. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  14. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    PubMed

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  15. 300 Area waste acid treatment system closure plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less

  16. Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, H.

    1998-07-01

    Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.

  17. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  18. Land use-based landscape planning and restoration in mine closure areas.

    PubMed

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  19. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...

  20. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  2. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  4. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  5. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Petrello, Jaclyn

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less

  6. 300 Area waste acid treatment system closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  7. 78 FR 10163 - Notice of Availability of Draft Section 3116 Basis for Determination for Closure of H Tank Farm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...

  8. The macroeconomic impact of pandemic influenza: estimates from models of the United Kingdom, France, Belgium and The Netherlands.

    PubMed

    Keogh-Brown, Marcus Richard; Smith, Richard D; Edmunds, John W; Beutels, Philippe

    2010-12-01

    The 2003 outbreak of severe acute respiratory syndrome (SARS) showed that infectious disease outbreaks can have notable macroeconomic impacts. The current H1N1 and potential H5N1 flu pandemics could have a much greater impact. Using a multi-sector single country computable general equilibrium model of the United Kingdom, France, Belgium and The Netherlands, together with disease scenarios of varying severity, we examine the potential economic cost of a modern pandemic. Policies of school closure, vaccination and antivirals, together with prophylactic absence from work are evaluated and their cost impacts are estimated. Results suggest GDP losses from the disease of approximately 0.5-2% but school closure and prophylactic absenteeism more than triples these effects. Increasing school closures from 4 weeks at the peak to entire pandemic closure almost doubles the economic cost, but antivirals and vaccinations seem worthwhile. Careful planning is therefore important to ensure expensive policies to mitigate the pandemic are effective in minimising illness and deaths.

  9. 40 CFR 264.197 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...

  10. Identification of Selected Child-Resistant Closures (Continuous Thread, Lug-Bayonet, and Snap Closures).

    ERIC Educational Resources Information Center

    Gross, Rosalind L.; White, Harry E.

    This publication describes a selected group of child-resistant closures used in packaging five categories of medicine and household products. The material in the document was collected to train survey personnel to identify closures for a planned household study of the effectiveness of child-resistant packaging. The 39 closures described are of…

  11. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less

  12. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  13. 43 CFR 3809.401 - Where do I file my plan of operations and what information must I include with it?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... would not result in unnecessary or undue degradation of public lands. (b) Your plan of operations must... BLM to determine that the plan of operations prevents unnecessary or undue degradation: (1) Operator... closure (including periods of seasonal closure) to prevent unnecessary or undue degradation. The interim...

  14. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...

  15. 40 CFR 264.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...

  16. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  17. 40 CFR 258.72 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used...

  18. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less

  19. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  20. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...

  1. School closures during the 2009 influenza pandemic: national and local experiences

    PubMed Central

    2014-01-01

    Background School closure is a non-pharmaceutical intervention that was considered in many national pandemic plans developed prior to the start of the influenza A(H1N1)pdm09 pandemic, and received considerable attention during the event. Here, we retrospectively review and compare national and local experiences with school closures in several countries during the A(H1N1)pdm09 pandemic. Our intention is not to make a systematic review of country experiences; rather, it is to present the diversity of school closure experiences and provide examples from national and local perspectives. Methods Data were gathered during and following a meeting, organized by the European Centres for Disease Control, on school closures held in October 2010 in Stockholm, Sweden. A standard data collection form was developed and sent to all participants. The twelve participating countries and administrative regions (Bulgaria, China, France, Hong Kong Special Administrative Region (SAR), Italy, Japan, New Zealand, Serbia, South Africa, Thailand, United Kingdom, and United States) provided data. Results Our review highlights the very diverse national and local experiences on school closures during the A(H1N1)pdm09 pandemic. The processes including who was in charge of making recommendations and who was in charge of making the decision to close, the school-based control strategies, the extent of school closures, the public health tradition of responses and expectations on school closure varied greatly between countries. Our review also discusses the many challenges associated with the implementation of this intervention and makes recommendations for further practical work in this area. Conclusions The single most important factor to explain differences observed between countries may have been the different public health practises and public expectations concerning school closures and influenza in the selected countries. PMID:24739814

  2. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  3. 77 FR 55896 - Notice of Release Effecting Federal Grant Assurance Obligations Due to Airport Layout Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... Grant Assurance Obligations Due to Airport Layout Plan Revision at Mather Airport, Sacramento, CA AGENCY... Mather Airport, Sacramento, California, which will provide for a release from the Grant Agreement... the closure of Mather Air Force Base pursuant to the Defense Base Closure and Realignment Act of 1988...

  4. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  5. Closing Rocky Flats by 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuor, N. R.; Schubert, A. L.

    2002-02-26

    Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less

  6. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  7. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  8. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikolich, George; Mizell, Steve; McCurdy, Greg

    Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring. In 2011, DRI installed two meteorological monitoring stations south (station #1) and north (station #2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters are recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2015.« less

  9. 77 FR 20375 - Notice of Availability of Secretarial Determination and Basis for Determination Under Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... that the waste in the FTF: (1) Does not require permanent isolation in a deep geologic repository for... pursuant to a State approved closure plan or State-issued permit; or (3)(B) exceeds concentration limits... 10 CFR part 61, Subpart C; pursuant to a State-approved closure plan or State-issued [[Page 20376...

  10. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  11. School Closings in Philadelphia

    ERIC Educational Resources Information Center

    Jack, James; Sludden, John

    2013-01-01

    In 2012, the School District of Philadelphia closed six schools. In 2013, it closed 24. The closure of 30 schools has occurred amid a financial crisis, headlined by the district's $1.35 billion deficit. School closures are one piece of the district's plan to cut expenditures and close its budget gap. The closures are also intended to make…

  12. Evaluation of Unintended Social and Economic Consequences of an Unplanned School Closure in Rural Illinois

    ERIC Educational Resources Information Center

    Tsai, Victoria; Khan, Nomana M.; Shi, Jianrong; Rainey, Jeanette; Gao, Hongjiang; Zheteyeva, Yenlik

    2017-01-01

    Background: School closure is one of the primary measures considered during severe influenza pandemics and other emergencies. However, prolonged school closures may cause unintended adverse consequences to schools, students, and their families. A better understanding of these consequences will inform prepandemic planning, and help public health…

  13. Planned secondary wound closure at the circular stapler insertion site after laparoscopic gastric bypass reduces postoperative morbidity, costs, and hospital stay.

    PubMed

    Vetter, Diana; Raptis, Dimitri Aristotle; Giama, Mira; Hosa, Hanna; Muller, Markus K; Nocito, Antonio; Schiesser, Marc; Moos, Rudolf; Bueter, Marco

    2017-12-01

    The aims of the present study were to assess whether planned secondary wound closure at the insertion site of the circular stapler reduces wound infection rate and postoperative morbidity after laparoscopic Roux-en-Y gastric bypass (RYGB) and to identify independent predictive factors increasing the risk for wound infections after RYGB. This paper is a retrospective single-center analysis of a prospectively collected database of 1400 patients undergoing RYGB surgery in circular technique between June 2000 and June 2016. Planned secondary wound closure at the circular stapler introduction site was performed at postoperative day 3 in 291 (20.8%) consecutive patients and compared to a historical control of 1109 (79.2%) consecutive patients with primary wound closure. Independent predictive factors for wound infection were assessed by multivariable analysis. Secondary wound closure significantly decreased wound infection rate from 9.3% (103/1109) to 1% (3/291) (p < 0.001) leading to a shorter hospital stay (mean 9 (SD8) vs. 7 days (SD2), p < 0.001), lower costs (p = 0.039), and reduced postoperative morbidity (mean 90-day Comprehensive Complication Index (CCI) 7.4 (SD14.0) vs. 5.1 (SD11.1) p = 0.008) when compared to primary wound closure. Primary wound closure, dyslipidemia, and preoperative gastritis were independent predictive risk factors for developing wound infections both in the univariate (p < 0.001; p = 0.048; p = 0.003) and multivariable analysis (p < 0.001; p = 0.040; p = 0.012). Further, on multivariable analysis, the female gender was a predictive factor (p = 0.034) for wound infection development. Secondary wound closure at the circular stapler introduction site in laparoscopic RYGB significantly reduces the overall wound infection rate as well as postoperative morbidity, costs, and hospital stay when compared to primary wound closure.

  14. Protecting an island nation from extreme pandemic threats: Proof-of-concept around border closure as an intervention.

    PubMed

    Boyd, Matt; Baker, Michael G; Mansoor, Osman D; Kvizhinadze, Giorgi; Wilson, Nick

    2017-01-01

    Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, "Scenario A"), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of "Scenario A", or 2.75% of the country's population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for "Scenario A" times three for 26 weeks of border closure-but not for only 12 weeks of closure when it would still be beneficial). This "proof-of-concept" work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective.

  15. Feasibility of lane closures using probe data.

    DOT National Transportation Integrated Search

    2017-04-01

    To develop an adequate traffic operations management and congestion mitigation plan for every roadway : maintenance and construction project requiring lane closures, transportation agencies need accurate and : reliable estimates of traffic impacts as...

  16. 77 FR 67023 - Notice of Temporary Closure on Public Lands in Mesa County, CO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... soils in place. A temporary closure of public land to vehicle and foot traffic within the burned area is... germinating, hybrid annual seed and plans to disperse native species seeds in the affected area. The dispersed... Pine Ridge Fire Temporary Closure Area by any means of transportation, including by vehicle or foot...

  17. Thinning guidelines from crown area relationships for young hardwood plantations

    Treesearch

    Jeffrey W. Stringer; Luke Cecil

    2010-01-01

    Crown closure in hardwood plantations signals the first opportunity to apply density control treatments such as thinning or release. The proper timing of these treatments is a function of stocking levels and is generally scheduled within several years after initial crown closure. Predicting crown closure for a plantation provides practitioners with the ability to plan...

  18. Recommendations for a barrier island breach management plan for Fire Island National Seashore, including the Otis Pike High Dune Wilderness Area, Long Island, New York

    USGS Publications Warehouse

    Williams, S. Jeffress; Foley, Mary K.

    2007-01-01

    4. Economic costs and benefits of artificial closure. This report for breach management presents protocols which specify when breach closures within the FIIS might be desirable and necessary, as well as provides recommendations for structural breach closure engineering operations which are indented to minimize negative impacts to the natural wilderness values and cultural resources within the FIIS, particularly the Otis Pike Wilderness Area. The goal of the plan is to strike a balance between protecting natural resources and allowing natural processes to operate and avoiding loss of life and excessive property damage.

  19. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  20. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  1. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    Fort Devens . The table will be updated as additional remedial actions are completed . Following Table D-1 are the executive summaries of...provides for the identification of appropriate, cost effective and integrated remedial actions , installation-wide. The BCT is working with the Fort Devens ...and 3-5, respectively. Three compliance-related activities at Fort Devens have been completed as early actions in order to reduce or eliminate

  2. 300 Area process trench sediment analysis report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, M.G.; Kossik, C.D.

    1987-12-01

    This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less

  3. Group Dynamics as a Critical Component of Successful Space Exploration: Conceptual Theory and Insights from the Biosphere 2 Closure Experiment

    NASA Astrophysics Data System (ADS)

    Nelson, Mark; Allen, John P.

    As space exploration and eventually habitation achieves longer durations, successfully managing group dynamics of small, physically isolated groups will become vital. The paper summarizes important underlying research and conceptual theory and how these manifested in a well-documented example: the closure experiments of Biosphere 2. Key research breakthroughs in discerning the operation of small human groups comes from the pioneering work of W.R. Bion. He discovered two competing modalities of behavior. The first is the “task-oriented” or work group governed by shared acceptance of goals, reality-thinking in relation to time, resources and rational, and intelligent management of challenges presented. The opposing, usually unconscious, modality is what Bion called the “basic-assumption” group and alternates between three “group animal” groups: dependency/kill the leader; fight/flight and pairing. If not dealt with, these dynamics work to undermine and defeat the conscious task group’s goal achievement. The paper discusses crew training and selection, various approaches to structuring the work and hierarchy of the group, the importance of contact with a larger population through electronic communication and dealing with the “us-them” syndrome frequently observed between crew and Mission Control. The experience of the first two year closure of Biosphere 2 is drawn on in new ways to illustrate vicissitudes and management of group dynamics especially as both the inside team of biospherians and key members of Mission Control had training in working with group dynamics. Insights from that experience may help mission planning so that future groups in space cope successfully with inherent group dynamics challenges that arise.

  4. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick K.

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  6. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less

  7. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  8. Centrifugal shot blasting. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1999-07-01

    At the US Department of Energy (DOE) Fernald Environmental Management Project (FEMP), the Facilities Closure and Demolition Projects Integrated Remedial Design/Remedial Action (RD/RA) work plan calls for the removal of one inch (1 in) depth of concrete surface in areas where contamination with technetium-99 has been identified. This report describes a comparative demonstration between two concrete removal technologies: an innovative system using Centrifugal Shot Blasting (CSB) and a modified baseline technology called a rotary drum planer.

  9. 9 CFR 381.301 - Containers and closures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...

  10. 9 CFR 381.301 - Containers and closures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...

  11. 9 CFR 381.301 - Containers and closures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...

  12. 9 CFR 381.301 - Containers and closures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... examination should be based upon a statistical sampling plan. (2) All empty containers, closures, and flexible... the container plant records are made available to Program employees. Additional teardown examinations...

  13. BRAC, What Will it Cost

    DTIC Science & Technology

    1992-04-10

    Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year

  14. 78 FR 59731 - License Amendment Request for Closure of Calcium Fluoride Ponds at Honeywell Metropolis Works...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-3392; NRC-2011-0143] License Amendment Request for Closure of Calcium Fluoride Ponds at Honeywell Metropolis Works, Honeywell International, Inc. AGENCY... Federal Regulations (10 CFR) to approve the closure of the calcium fluoride ponds in-place, by...

  15. 40 CFR 265.113 - Closure; time allowed for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  16. Report to Congress on a Compliance Plan for the Underground Storage Tank Program

    EPA Pesticide Factsheets

    Learn about identification of USTs that are not in compliance with Subtitle I of the Solid Waste Disposal Act or are in temporary closure, and determine the ownership of USTs not in compliance or in temporary closure

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  18. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  19. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less

  20. Protecting an island nation from extreme pandemic threats: Proof-of-concept around border closure as an intervention

    PubMed Central

    Boyd, Matt; Baker, Michael G.; Mansoor, Osman D.; Kvizhinadze, Giorgi; Wilson, Nick

    2017-01-01

    Background Countries are well advised to prepare for future pandemic risks (e.g., pandemic influenza, novel emerging agents or synthetic bioweapons). These preparations do not typically include planning for complete border closure. Even though border closure may not be instituted in time, and can fail, there might still plausible chances of success for well organized island nations. Objective To estimate costs and benefits of complete border closure in response to new pandemic threats, at an initial proof-of-concept level. New Zealand was used as a case-study for an island country. Methods An Excel spreadsheet model was developed to estimate costs and benefits. Case-study specific epidemiological data was sourced from past influenza pandemics. Country-specific healthcare cost data, valuation of life, and lost tourism revenue were imputed (with lost trade also in scenario analyses). Results For a new pandemic equivalent to the 1918 influenza pandemic (albeit with half the mortality rate, “Scenario A”), it was estimated that successful border closure for 26 weeks provided a net societal benefit (e.g., of NZ$11.0 billion, USD$7.3 billion). Even in the face of a complete end to trade, a net benefit was estimated for scenarios where the mortality rate was high (e.g., at 10 times the mortality impact of “Scenario A”, or 2.75% of the country’s population dying) giving a net benefit of NZ$54 billion (USD$36 billion). But for some other pandemic scenarios where trade ceased, border closure resulted in a net negative societal value (e.g., for “Scenario A” times three for 26 weeks of border closure–but not for only 12 weeks of closure when it would still be beneficial). Conclusions This “proof-of-concept” work indicates that more detailed cost-benefit analysis of border closure in very severe pandemic situations for some island nations is probably warranted, as this course of action might sometimes be worthwhile from a societal perspective. PMID:28622344

  1. Some possibilities of a closure degree increase and matter turnover intensification in the bioregenerative life support system BIOS-3

    NASA Astrophysics Data System (ADS)

    Tikhomirov, A. A.; Ushakova, S. A.; Velichko, V. V.; Degermendzhy, Á. G.; Lasseur, Ch.; Lamaze, B.

    The problems of scientific-technical substantiation of perspective joint IBP-ESA works on imitation of functioning of stationary bioregenerative life support systems BLSS on Moon and or Mars are discussed With this purpose the possibilities of matter turnover intensification and closure degree increase which can be achieved after modernization of the BIOS-3 BLSS designed and constructed at Institute of Biophysics Siberian Branch of Russian Academy of Sciences IBP SB RAS Russia are considered These works are performed in the frame of INTAS IA project under the joint SB RAS-ESA financial support Specifically at the expense of intensity increase of photosynthetic active radiation from 150 to 250 Wt m 2 the productivity of photosynthesizing unit on oxygen and biomass is supposed to increase on 50 on average The given substantiation is based upon analysis of carried out preliminary experiments in a laboratory environment and in the BIOS-3 facility and also on series of experiments carried out at present time The results of technical reconstruction of lighting and thermoregulation systems demonstrating practical possibility of these plans implementation are produced On the grounds of mass exchange processes intensification the problems of a crew supply with vegetarian food and oxygen under a smaller photosynthesizing unit size are considered Some possibilities of the humans wastes utilization under combination of physicochemical and biological methods and necessary technical decisions allowing closure increase of matter turnover are

  2. Closedure - Mine Closure Technologies Resource

    NASA Astrophysics Data System (ADS)

    Kauppila, Päivi; Kauppila, Tommi; Pasanen, Antti; Backnäs, Soile; Liisa Räisänen, Marja; Turunen, Kaisa; Karlsson, Teemu; Solismaa, Lauri; Hentinen, Kimmo

    2015-04-01

    Closure of mining operations is an essential part of the development of eco-efficient mining and the Green Mining concept in Finland to reduce the environmental footprint of mining. Closedure is a 2-year joint research project between Geological Survey of Finland and Technical Research Centre of Finland that aims at developing accessible tools and resources for planning, executing and monitoring mine closure. The main outcome of the Closedure project is an updatable wiki technology-based internet platform (http://mineclosure.gtk.fi) in which comprehensive guidance on the mine closure is provided and main methods and technologies related to mine closure are evaluated. Closedure also provides new data on the key issues of mine closure, such as performance of passive water treatment in Finland, applicability of test methods for evaluating cover structures for mining wastes, prediction of water effluents from mine wastes, and isotopic and geophysical methods to recognize contaminant transport paths in crystalline bedrock.

  3. 77 FR 53164 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... Microsoft Word, Microsoft Excel, WordPerfect, or Adobe PDF file formats only. FOR FURTHER INFORMATION...). The closure was implemented based on advice from the U.S. Food and Drug Administration (FDA) after... Management Plan (FMP). Since the implementation of the closure, NOAA's National Ocean Service has provided...

  4. Knowing Where You're Going: Planning for Meaningful Course Closure

    ERIC Educational Resources Information Center

    Burgess-Van Aken, Barbara

    2017-01-01

    A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…

  5. Engineering study for closure of 209E facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  6. Closure Report for CAU No. 430: Buried Depleted Uraniuim Artillery Round No. 1, Tonopah Test Range, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1997-02-25

    1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less

  7. The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattlin, E.; Charboneau, S.; Johnston, G.

    2007-07-01

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less

  8. Troughs on Martian Ice Sheets: Analysis of Their Closure and Mass Balance

    NASA Technical Reports Server (NTRS)

    Fountain, A.; Kargel, J.; Lewis, K.; MacAyeal, D.; Pfeffer, T.; Zwally, J.

    2000-01-01

    At the Copenhagen workshop on Martian polar processes, Ralf Greve commented that the flow regime surrounding scarps and troughs of the Martian polar ice sheets cannot be modeled using traditional "plan view" ice-sheet models. Such models are inadequate because they typically use reduced equations that embody certain simplifications applicable only to terrestrial ice sheets where the upper ice sheet surface is smooth. In response to this suggestion, we have constructed a 2-dimensional, time dependent "side view" (two spatial dimensions: one horizontal, one vertical) model of scarp closure that is designed to overcome the difficulties described by Greve. The purpose of the model is to evaluate the scales of stress variation and styles of flow closure so as to estimate errors that may be encountered by "plan view" models. We show that there may be avenues whereby the complications associated with scarp closure can be overcome in "plan view" models through appropriate parameterizations of 3-dimensional effects. Following this, we apply the flow model to simulate the evolution of a typical scarp on the North Polar Cap of Mars. Our simulations investigate: (a) the role of "radiation trapping" (see our companion abstract) in creating and maintaining "spiral-like" scarps on the ice sheet, (b) the consequences of different flowlaws and ice compositions on scarp evolution and, in particular, scarp age, and (c) the role of dust and debris in scarp evolution.

  9. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less

  10. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Emergency Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent...

  11. Contact behaviour of children and parental employment behaviour during school closures against the pandemic influenza A (H1N1-2009) in Japan.

    PubMed

    Mizumoto, Kenji; Yamamoto, Taro; Nishiura, Hiroshi

    2013-06-01

    To identify epidemiological determinants of the contact behaviour of children and their impact on parental employment, during school closures that took place over the course of the 2009 pandemic influenza (H1N1-2009) in Japan. A retrospective survey was conducted in Japanese households between October 2009 and May 2010 by administration of a standardized questionnaire. Demographic and behavioural variables were explored, in association with the frequency with which children left the home and the risk of parents being absent from work during school closures. Data from 882 eligible households were analysed. A total of 181/882 (20.5%) of households reported that children left the home for nonessential reasons during school closures. No impact on parental working hours was reported by 742/882 (84.1%) of households. Univariate analyses showed that the frequency with which children left the home was dependent on age, extent of school closure and requirement for special childcare arrangements. A greater understanding of age-dependent behaviours, during school closures as a consequence of a pandemic, is required. Consideration of a public policy to permit a paid leave of absence from work for parents during school closures may be beneficial; the cost-effectiveness of such a measure should be assessed in future.

  12. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  13. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  14. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  15. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  16. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  17. Planning and Teaching To Remember.

    ERIC Educational Resources Information Center

    Davies, Nigel R.

    2001-01-01

    Suggests simple planning and instructional strategies to improve student learning and understanding for present and long -term application. The first section discusses learner-related issues. The second section focuses on the lesson plan (the introduction, the lesson body, and the lesson closure). The third section examines other strategies for…

  18. TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2012-01-03

    High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less

  19. Corrective Action Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0 with ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Burmeister, Mark

    2016-05-01

    The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31more » (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.« less

  20. CENTRAL PLATEAU REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less

  1. Material balance and diet in bioregenerative life support systems: connection with coefficient of closure.

    PubMed

    Manukovsky, N S; Kovalev, V S; Somova, L A; Gurevich, Yu L; Sadovsky, M G

    2005-01-01

    Bioregenerative life support systems (BLSS) with different coefficients of closure are considered. The 66.2% coefficient of closure achieved in "BIOS-3" facility experiments has been taken as a base value. The increase in coefficient of closure up to 72.6-93.0% is planned due to use of soil-like substrate (SLS) and concentrating of urine. Food values were estimated both in a base variant ("BIOS-3"), and with increases in the coefficient of closure. It is shown that food requirements will be more fully satisfied by internal crop production with an increase in the coefficient of closure of the BLSS. Changes of massflow rates on an 'input-output' and inside BLSS are considered. Equations of synthesis and degradation of organic substances in BLSS were examined using a stoichiometric model. The paper shows that at incomplete closure of BLSS containing SLS there is a problem of nitrogen balancing. To compensate for the removal of nitrogen from the system in urine and feces, it is necessary to introduce food and a nitrogen-containing additive. c2005 COSPAR. Published by Elsevier Ltd. All rights reserved.

  2. Impact of lane closures on roadway capacity, phase 2.

    DOT National Transportation Integrated Search

    2014-01-01

    This project is a follow-up to Florida Department of Transportation (FDOT) research project BD545-61, Impact of : Lane Closures on Roadway Capacity (specifically, Part A: Development of a Two-Lane Work Zone Lane Closure : Analysis Procedure and...

  3. 40 CFR 267.112 - What procedures must I follow?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (1) Events leading to a change in the closure plan, and therefore requiring a modification, may include: (i) A change in the operating plan or facility design; (ii) A change in the expected year of...

  4. 23 CFR 630.1108 - Work zone safety management measures and strategies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...

  5. 23 CFR 630.1108 - Work zone safety management measures and strategies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...

  6. 23 CFR 630.1108 - Work zone safety management measures and strategies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...

  7. 23 CFR 630.1108 - Work zone safety management measures and strategies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... workers and road users, such as: (1) Work zones that provide workers no means of escape from motorized... exposure to motorized traffic and exposure of road users to work activities, while also providing adequate... individual projects, such as: (1) Full road closures; (2) Ramp closures; (3) Median crossovers; (4) Full or...

  8. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), themore » owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.« less

  9. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...

  10. Navier-Stokes computation of compressible turbulent flows with a second order closure, part 1

    NASA Technical Reports Server (NTRS)

    Haminh, Hieu; Kollmann, Wolfgang; Vandromme, Dany

    1990-01-01

    A second order closure turbulence model for compressible flows is developed and implemented in a 2D Reynolds-averaged Navier-Stokes solver. From the beginning where a kappa-epsilon turbulence model was implemented in the bidiagonal implicit method of MACCORMACK (referred to as the MAC3 code) to the final stage of implementing a full second order closure in the efficient line Gauss-Seidel algorithm, numerous work was done, individually and collectively. Besides the collaboration itself, the final product of this work is a second order closure derived from the Launder, Reece, and Rodi model to account for near wall effects, which has been called FRAME model, which stands for FRench-AMerican-Effort. During the reporting period, two different problems were worked out. The first was to provide Ames researchers with a reliable compressible boundary layer code including a wide collection of turbulence models for quick testing of new terms, both in two equations and in second order closure (LRR and FRAME). The second topic was to complete the implementation of the FRAME model in the MAC5 code. The work related to these two different contributions is reported. dilatation in presence of stron shocks. This work, which has been conducted during a work at the Center for Turbulence Research with Zeman aimed also to cros-check earlier assumptions by Rubesin and Vandromme.

  11. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less

  12. Household Effects of School Closure during Pandemic (H1N1) 2009, Pennsylvania, USA

    PubMed Central

    Palekar, Rakhee S.; Sodha, Samir V.; Kent, Charlotte K.; Fagan, Ryan P.; Archer, W. Roodly; Edelson, Paul J.; Marchbanks, Tiffany; Bhattarai, Achuyt; Swerdlow, David; Ostroff, Stephen; Meltzer, Martin I.

    2010-01-01

    To determine the effects of school closure, we surveyed 214 households after a 1-week elementary school closure because of pandemic (H1N1) 2009. Students spent 77% of the closure days at home, 69% of students visited at least 1 other location, and 79% of households reported that adults missed no days of work to watch children. PMID:20678335

  13. Household effects of school closure during pandemic (H1N1) 2009, Pennsylvania, USA.

    PubMed

    Gift, Thomas L; Palekar, Rakhee S; Sodha, Samir V; Kent, Charlotte K; Fagan, Ryan P; Archer, W Roodly; Edelson, Paul J; Marchbanks, Tiffany; Bhattarai, Achuyt; Swerdlow, David; Ostroff, Stephen; Meltzer, Martin I

    2010-08-01

    To determine the effects of school closure, we surveyed 214 households after a 1-week elementary school closure because of pandemic (H1N1) 2009. Students spent 77% of the closure days at home, 69% of students visited at least 1 other location, and 79% of households reported that adults missed no days of work to watch children.

  14. The closure problem for turbulence in meteorology and oceanography

    NASA Technical Reports Server (NTRS)

    Pierson, W. J., Jr.

    1985-01-01

    The dependent variables used for computer based meteorological predictions and in plans for oceanographic predictions are wave number and frequency filtered values that retain only scales resolvable by the model. Scales unresolvable by the grid in use become 'turbulence'. Whether or not properly processed data are used for initial values is important, especially for sparce data. Fickian diffusion with a constant eddy diffusion is used as a closure for many of the present models. A physically realistic closure based on more modern turbulence concepts, especially one with a reverse cascade at the right times and places, could help improve predictions.

  15. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less

  16. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  17. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the wastes, application of advanced technology, or alternative disposal, treatment, or re-use.... 265.118 Section 265.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...

  18. Framework for culturally competent decisionmaking in child welfare.

    PubMed

    Cohen, Elena P

    2003-01-01

    This article provides a framework to understand the cultural, social, political, and economic factors that affect decisionmaking when working with ethnically and racially diverse families in the child welfare system. The article describes external factors affecting the decisionmaking process, including community environment, agency structure, and family characteristics. It then reviews the core stages of the casework process, describing key decisions during intake, assessment, service planning, implementation, evaluation, and closure. Although the framework is based on casework process in the child welfare system, it can be adapted to other child-serving systems, including education, mental health, and juvenile justice.

  19. Open abdomen treatment for septic patients with gastrointestinal fistula: from fistula control to definitive closure.

    PubMed

    Ren, Jianan; Yuan, Yujie; Zhao, Yunzhao; Gu, Guosheng; Wang, Gefei; Chen, Jun; Fan, Chaogang; Wang, Xinbo; Li, Jieshou

    2014-04-01

    The use of open abdomen in the management of gastrointestinal fistula complicated with severe intra-abdominal infection is uncommon. This study was designed to evaluate outcomes of our staged approach for the infected open abdomen. Patients who had gastrointestinal fistula and underwent open abdomen treatment were retrospectively reviewed. Various materials such as polypropylene mesh and a modified sandwich package were used to achieve temporary abdominal closure followed by skin grafting when the granulation bed matured. A delayed definitive operation was performed for final abdominal closure without implant of prosthetic mesh. Between 1999 and 2009, 56 (68.3%) of 82 patients survived through this treatment. Among them, 42 patients achieved final abdominal closure. Spontaneous fistula closure occurred in 16 patients with secondary fistula recorded in six patients. Besides, wound complications occurred in 13 patients with two cases for pulmonary infection. Within a 12-month follow-up period after definitive closure, no additional fistula was recorded excluding planned ventral hernia repair. Open abdomen treatment was effective for gastrointestinal fistula complicated by severe intra-abdominal infection. A delayed and deliberate operative strategy aiming at fistula excision and fascial closure, with simultaneous abdominal wall reconstruction, was required for the infected open abdomen.

  20. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  1. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, Virginia T.; Smith, Kathleen S.; Russell, Carol C.

    2007-01-01

    An important aspect of planning a new mine or mine expansion within the modern regulatory framework is to design for ultimate closure. Sampling and monitoring for closure is a form of environmental risk management. By implementing a sampling and monitoring program early in the life of the mining operation, major costs can be avoided or minimized. The costs for treating mine drainage in perpetuity are staggering, especially if they are unanticipated. The Metal Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS), a cooperative government-industry-academia organization, was established to address drainage-quality technologies of metal mining and metallurgical operations. ADTI-MMS recommends that sampling and monitoring programs consider the entire mine-life cycle and that data needed for closure of an operation be collected from exploration through postclosure.

  2. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  3. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  4. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  5. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  6. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  7. Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.

    PubMed

    Ergene Şentürk, Didar; Alp, Emre

    2016-11-01

    Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.

  8. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  9. Patient-specific catheter shaping for the minimally invasive closure of the left atrial appendage.

    PubMed

    Graf, Eva C; Ott, Ilka; Praceus, Julian; Bourier, Felix; Lueth, Tim C

    2018-06-01

    The minimally invasive closure of the left atrial appendage is a promising alternative to anticoagulation for stroke prevention in patients suffering from atrial fibrillation. One of the challenges of this procedure is the correct positioning and the coaxial alignment of the tip of the catheter sheath to the implant landing zone. In this paper, a novel preoperative planning system is proposed that allows patient-individual shaping of catheters to facilitate the correct positioning of the catheter sheath by offering a patient-specific catheter shape. Based on preoperative three-dimensional image data, anatomical points and the planned implant position are marked interactively and a patient-specific catheter shape is calculated if the standard catheter is not considered as suitable. An approach to calculate a catheter shape with four bends by maximization of the bending radii is presented. Shaping of the catheter is supported by a bending form that is automatically generated in the planning program and can be directly manufactured by using additive manufacturing methods. The feasibility of the planning and shaping of the catheter could be successfully shown using six data sets. The patient-specific catheters were tested in comparison with standard catheters by physicians on heart models. In four of the six tested models, the participating physicians rated the patient-individual catheters better than the standard catheter. The novel approach for preoperatively planned and shaped patient-specific catheters designed for the minimally invasive closure of the left atrial appendage could be successfully implemented and a feasibility test showed promising results in anatomies that are difficult to access with the standard catheter.

  10. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  11. Orthodontic Replacement of Lost Permanent Molar with Neighbor Molar: A Six-Year Follow-Up

    PubMed Central

    Shintcovsk, Ricardo Lima; Knop, Luegya Amorim Henriques; Sampaio, Luana Paz

    2017-01-01

    Extraction is very frequent indication in orthodontic planning, especially when there are crowding, biprotrusion, and aesthetically unpleasant profiles. Next to extraction comes space closure, which represents a challenge for orthodontists because of extended treatment time, discomfort created for the patient, tissue tolerance, and stability concerns. When it comes to what mechanics to choose for space closure, loops present two major advantages in relation to sliding mechanics: absence of abrasion and possibility to reach pure dental translation. A case is presented where an adult female patient with early loss of the first lower permanent molars, minor lower crowding, and tooth biprotrusion was treated with upper first bicuspids extraction along with upper and lower space closure done with T-loops to promote best space closure control in order to correct the malocclusion and enhance facial aesthetics. PMID:29318054

  12. A snapshot of summer 2001 work zone activity : based on information reported on state road closure and construction websites

    DOT National Transportation Integrated Search

    2003-02-01

    In a study sponsored by the Federal Highway Administration (FHWA), researchers conducted a survey of 789 work zones posted on 13 state road closure and construction websites during a two-week snapshot of the peak summer roadwork season in 2001. The g...

  13. Role of household factors in parental attitudes to pandemic influenza-related school closure in Japan: a cross-sectional study.

    PubMed

    Uchida, Mitsuo; Kaneko, Minoru; Kawa, Shigeyuki

    2014-10-21

    To investigate how household background factors affect parental behavior during pandemic influenza-related school closures, we determined associations between such factors and three parental attitudes: "caring for the child", "taking leave from work", and "permitting out-of-home activities". A hypothetical pandemic influenza situation was presented and a questionnaire survey among households of 2146 schoolchildren from 6 schools was conducted. Odds ratios of background factors were estimated using univariate and multivariate logistic regression models. Responses pertaining to 1510 children indicated that junior high school (OR = 0.11), both parents working (OR = 0.03), and family including grandparent(s) or other relatives (OR = 7.50) were factors associated with "caring for the child", and elementary school (OR = 2.28), special education school (OR = 3.18), and both parents working (OR = 5.74) were associated with "taking leave from work". Having an older sibling (OR = 0.74) and awareness of the technical term for school closure (OR = 0.73) were factors associated with "permitting out-of-home activities". Not only work status but also other household factors may be associated with parental behaviors during pandemic influenza-related school closures.

  14. Sustainable gold mining management waste policy in Romania

    NASA Astrophysics Data System (ADS)

    Tudor, Elena; Filipciuc, Constantina

    2016-04-01

    Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands. According to the World Commission on Environment and Development definition, sustainable development is the type of development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Romania has the largest gold reserves in Europe (760 million tons of gold-silver ores, of which 40 million tons in 68 gold deposits in the Apuseni Mountains. New mining projects draw particular attention regarding the environmental risks they cause. Rehabilitation is an ongoing consideration throughout the mine's lifecycle, both from a technical and a financial standpoint. The costs of land rehabilitation are classified as the mine's operating costs. According to Directive 2004/35/EC on environmental liability, the prevention and remedying of environmental damage should be implemented by applying the "polluter pays" principle, in line with the principle of sustainable development. Directive on the management of waste from extractive industries and amending Directive obliges operators to provide (and periodically adjust in size) a financial guarantee for waste facility maintenance and post-closure site restoration, including land rehabilitation. According to the Romanian Mining Law, the license holder has the following obligations related to land use and protection: to provide environmental agreements as one of the prerequisites for a building permit; to regularly update the mine closure plan; to set up and maintain the financial guarantee for environmental rehabilitation; and to execute and finalize the environmental rehabilitation of affected land in the mining site, according to the mine closure plan, including the post-closure monitoring program implementation and financing. Apart from the Mining Law, the Government Decision, which transposes EU Directive on the management of waste from extractive industries, as well as Government Emergency Ordinance, which implements the requirements of EU Directive 2004/35/CE on environmental liability, requests financial guarantees for waste facilities maintenance and for environment restoration in the case of pollution, respectively. In practice, there are problems in the calculation of the financial guarantee and the development of financial security instruments and markets as required by Directive, due to the lack of expertise in financial, economic and liability matters. Mining companies are usually not required to set up a special guarantee for the waste facilities, but only to set up and maintain the financial guarantee regulated under the Mining Law. Romania - because of the structure of its mining sector - has serious environmental legacies, a lack of funds for their restoration and the need to strengthen the administrative capacity in this area, as well as the important tasks on harmonization and/or implementation of the EU mining waste legislation. This work is presented within the framework of SUSMIN project. Key words : sustainable development, waste management, policy

  15. Analysis of Factors that Influence Infiltration Rates using the HELP Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, J.; Shipmon, J.

    The Hydrologic Evaluation of Landfill Performance (HELP) model is used by Savannah River National Laboratory (SRNL) in conjunction with PORFLOW groundwater flow simulation software to make longterm predictions of the fate and transport of radionuclides in the environment at radiological waste sites. The work summarized in this report supports preparation of the planned 2018 Performance Assessment for the E-Area Low-Level Waste Facility (LLWF) at the Savannah River Site (SRS). More specifically, this project focused on conducting a sensitivity analysis of infiltration (i.e., the rate at which water travels vertically in soil) through the proposed E-Area LLWF closure cap. A sensitivitymore » analysis was completed using HELP v3.95D to identify the cap design and material property parameters that most impact infiltration rates through the proposed closure cap for a 10,000-year simulation period. The results of the sensitivity analysis indicate that saturated hydraulic conductivity (Ksat) for select cap layers, precipitation rate, surface vegetation type, and geomembrane layer defect density are dominant factors limiting infiltration rate. Interestingly, calculated infiltration rates were substantially influenced by changes in the saturated hydraulic conductivity of the Upper Foundation and Lateral Drainage layers. For example, an order-of-magnitude decrease in Ksat for the Upper Foundation layer lowered the maximum infiltration rate from a base-case 11 inches per year to only two inches per year. Conversely, an order-of-magnitude increase in Ksat led to an increase in infiltration rate from 11 to 15 inches per year. This work and its results provide a framework for quantifying uncertainty in the radionuclide transport and dose models for the planned 2018 E-Area Performance Assessment. Future work will focus on the development of a nonlinear regression model for infiltration rate using Minitab 17® to facilitate execution of probabilistic simulations in the GoldSim® overall system model for the E-Area LLWF.« less

  16. Variability in school closure decisions in response to 2009 H1N1: a qualitative systems improvement analysis

    PubMed Central

    2011-01-01

    Background School closure was employed as a non-pharmaceutical intervention against pandemic 2009 H1N1, particularly during the first wave. More than 700 schools in the United States were closed. However, closure decisions reflected significant variation in rationales, decision triggers, and authority for closure. This variability presents the opportunity for improved efficiency and decision-making. Methods We identified media reports relating to school closure as a response to 2009 H1N1 by monitoring high-profile sources and searching Lexis-Nexis and Google news alerts, and reviewed reports for key themes. News stories were supplemented by observing conference calls and meetings with health department and school officials, and by discussions with decision-makers and community members. Results There was significant variation in the stated goal of closure decision, including limiting community spread of the virus, protecting particularly vulnerable students, and responding to staff shortages or student absenteeism. Because the goal of closure is relevant to its timing, nature, and duration, unclear rationales for closure can challenge its effectiveness. There was also significant variation in the decision-making authority to close schools in different jurisdictions, which, in some instances, was reflected in open disagreement between school and public health officials. Finally, decision-makers did not appear to expect the level of scientific uncertainty encountered early in the pandemic, and they often expressed significant frustration over changing CDC guidance. Conclusions The use of school closure as a public health response to epidemic disease can be improved by ensuring that officials clarify the goals of closure and tailor closure decisions to those goals. Additionally, authority to close schools should be clarified in advance, and decision-makers should expect to encounter uncertainty disease emergencies unfold and plan accordingly. PMID:21284865

  17. PLUTONIUM FINISHING PLANT (PFP) 241-Z LIQUID WASTE TREATMENT FACILITY DEACTIVATION AND DEMOLITION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JOHNSTON GA

    2008-01-15

    Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique with in the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site.more » The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site . All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individual confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.« less

  18. Allegation of ethnic minorities from 1993-2008: an Equal Employment Opportunity Commission (EEOC) study.

    PubMed

    Arango-Lasprilla, Juan Carlos; Ketchum, Jessica M; Hurley, Jessica; Getachew, Almaz M; Gary, Kelli Williams

    2014-01-01

    Approximately 25% of working-aged Americans with disabilities work full or part time, yet still face discrimination despite the passing of the American's with Disabilities Act (ADA) over 20 years ago. To determine if the proportion of allegations of ADA Title I workplace discrimination with merit closed at any year between 1993 and 2008 differs among Whites, African Americans, Hispanics, and Asians; to determine if there was a change over time from 1993 to 2008 in merit closure rate within each race/ethnicity group; and to determine whether changes over time between 1993 and 2008 in the merit closure rate differ among the race/ethnicity groups. Logistic regression was used for this cross-sectional panel study to model the merit closure rate for each ethnic group from 1993 to 2008 using 318,587 charging parties from the EEOC database. All ethnic groups exhibited significant changes over time in the merit closure rate. There were significant differences in the closure rates among the race/ethnicity groups specifically at closure years 1995-2000, 2002, 2003, and 2006. Finally, there was evidence that the trends in merit closure rates over time differed significantly among the race/ethnicity groups. There was significant evidence that the proportion of claims closed with merit was significantly different among the racial/ethnicity groups.

  19. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  20. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less

  1. The modern staged repair of classic bladder exstrophy: a detailed postoperative management strategy for primary bladder closure.

    PubMed

    Stec, Andrew A; Baradaran, Nima; Schaeffer, Anthony; Gearhart, John P; Matthews, Ranjiv I

    2012-10-01

    Successful primary bladder closure of classic bladder exstrophy sets the stage for development of adequate bladder capacity and eventual voided continence. The postoperative pathway following primary bladder closure at the authors' institution is quantitatively and qualitatively detailed. Sixty-five consecutive newborns (47 male) undergoing primary closure of classic bladder exstrophy were identified and data were extracted relating to immediate postoperative care. Overall success rate was utilized to validate the pathway. Mean age at time of primary closure was 4.6 days and mean hospital stay was 35.8 days. Osteotomy was performed in 19 patients (mean age 8.8 days), and was not required in 39 infants (mean age 2.9 days). All patients were immobilized for 4 weeks. Tunneled epidural analgesia was employed in 61/65 patients. All patients had ureteral catheters and a suprapubic tube, along with a comprehensive antibiotic regimen. Postoperative total parenteral nutrition was commonly administered, and enteral feedings started around day 4.6. Our success rate of primary closure was 95.4%. A detailed and regimented plan for bladder drainage, immobilization, pain control, nutrition, antimicrobial prophylaxis, and adequate healing time is a cornerstone for the postoperative management of the primary closure of bladder exstrophy. Copyright © 2011 Journal of Pediatric Urology Company. Published by Elsevier Ltd. All rights reserved.

  2. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less

  3. Economic Development Assistance for Communities Affected by Employment Changes Due to Military Base Closures (BRAC)

    DTIC Science & Technology

    2009-06-16

    resolution of disapproval is passed by Congress. Following the actual base closings and realignments, DOD develops an environmental remediation plan...examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base Closures: DOD’s 2005 Internal Selection...review and remediation . 2 Prior to the 1988 BRAC round, military installations were closed, or their missions were altered by order of the Secretary of

  4. Cutting roller

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Best, G.; Weikert, N.B.

    1984-05-29

    A cutting roller for a mining machine, having a substantially conical closure member arranged to face the workings and a tubular body member which has a larger diameter at the end nearer the face working face than at the discharge end. The tubular member carries at least one cutting blade, and the closure member mounts at least one cutting blade; each blade is provided at its edge region with a plurality of bit holders for the attachment of cutter bits. The outer surface of the body member merges into the substantially conical closure member in a smooth, even curve, somore » that the outside diameter of the body member in the region of the working face is substantially greater than the diameter in the region of the discharge end of the cutting roller. The roller is provided with liquid distribution channels on each cutting blade, which channels are connected to a single liquid distribution ring channel in the region of the substantially conical closure member.« less

  5. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grabaskas, David; Bucknor, Matthew; Jerden, James

    2016-02-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides duringmore » a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.« less

  6. Effect of Stress and Strain Path on Cavity Closure During Hot Working of an Alpha/Beta Titanium Alloy (Preprint)

    DTIC Science & Technology

    2007-07-01

    damage totally. 15. SUBJECT TERMS Ti- 6Al - 4V , strain, stress, cavity closure, hot working, titanium alloy 16. SECURITY CLASSIFICATION OF: 17...stress state on deformation and cavitation during hot working of Ti- 6Al - 4V was established via torsion-compression and reversed-torsion tests...strain path and stress state on deformation and cavitation during hot working of Ti- 6Al - 4V was established via torsion-compression and reversed

  7. Unintended costs and consequences of school closures implemented in preparation for Hurricane Isaac in Harrison County School District, Mississippi, August-September 2012

    PubMed Central

    Zheteyeva, Yenlik; Rainey, Jeanette J.; Gao, Hongjiang; Jacobson, Evin U.; Adhikari, Bishwa B.; Shi, Jianrong; Mpofu, Jonetta J.; Bhavnani, Darlene; Dobbs, Thomas; Uzicanin, Amra

    2017-01-01

    Introduction School closures, while an effective measure against the spread of disease during a pandemic, may carry unintended social and economic consequences for students and families. We evaluated these costs and consequences following a 4-day school closure in Mississippi’s Harrison County School District (HCSD). Methods In a survey of all households with students enrolled in HCSD, we collected information on difficulties related to the school closure, including interruption of employment and pay, loss of access to subsidized school meals, and arrangement of alternative childcare. We analyzed this information in the context of certain demographic characteristics of the survey respondents and households, such as race, level of education, and income. We also estimated the average number of lost work days and documented the childcare alternatives chosen by households affected by the school closure. Results We received 2,229 (28.4%) completed surveys from an estimated 7,851 households eligible to participate. About half (1,082 [48.5%]) of the households experienced at least some difficulty during the closure, primarily in three areas: uncertainty about duration of the closure, lost income, and the effort of arranging alternate childcare. Adults working outside the home, particularly the major wage earner in the household, were more likely to suffer lost income while schools were closed, an effect mitigated by paid leave benefits. Difficulty arranging childcare was reported most frequently by respondents with lower levels of education and households with younger children. Beyond the top three concerns expressed by households in HCSD, the survey also shed light on the issue of food insecurity when subsidized school meals are not available. Reported by 17.9% of households participating in the subsidized school lunch program, difficulty providing meals during the closure was associated with higher numbers of dependent children, selection of “other” as the race of the household respondent, and lower levels of education. Conclusion To help prevent undue financial hardship in families of school children, public health authorities and school administrators should provide recommendations for childcare alternatives and paid leave or remote work options during prolonged school closures, particularly to households in which all adults work outside of the home. PMID:29091717

  8. Taking Closure to the Next Level - 13030

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2013-07-01

    The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach tomore » transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)« less

  9. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, V.T.; Russell, C.C.; Smith, K.S.

    2004-01-01

    The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.

  10. Experimental study on tissue phantoms to understand the effect of injury and suturing on human skin mechanical properties.

    PubMed

    Chanda, Arnab; Unnikrishnan, Vinu; Flynn, Zachary; Lackey, Kim

    2017-01-01

    Skin injuries are the most common type of injuries occurring in day-to-day life. A skin injury usually manifests itself in the form of a wound or a cut. While a shallow wound may heal by itself within a short time, deep wounds require surgical interventions such as suturing for timely healing. To date, suturing practices are based on a surgeon's experience and may vary widely from one situation to another. Understanding the mechanics of wound closure and suturing of the skin is crucial to improve clinical suturing practices and also to plan automated robotic surgeries. In the literature, phenomenological two-dimensional computational skin models have been developed to study the mechanics of wound closure. Additionally, the effect of skin pre-stress (due to the natural tension of the skin) on wound closure mechanics has been studied. However, in most of these analyses, idealistic two-dimensional skin geometries, materials and loads have been assumed, which are far from reality, and would clearly generate inaccurate quantitative results. In this work, for the first time, a biofidelic human skin tissue phantom was developed using a two-part silicone material. A wound was created on the phantom material and sutures were placed to close the wound. Uniaxial mechanical tests were carried out on the phantom specimens to study the effect of varying wound size, quantity, suture and pre-stress on the mechanical behavior of human skin. Also, the average mechanical behavior of the human skin surrogate was characterized using hyperelastic material models, in the presence of a wound and sutures. To date, such a robust experimental study on the effect of injury and sutures on human skin mechanics has not been attempted. The results of this novel investigation will provide important guidelines for surgical planning and validation of results from computational models in the future.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diaz, Peter

    The U.S. Department of Energy's (DOE) first-of-a-kind closure project at the Hanford Site in Richland, Washington, still has more than 3 years to run, but its contractor, Washington Closure Hanford (WCH), has already started its plans for going out of business. It will be the first contract that closes in increments and, paramount to its success, will be its ability to provide a disciplined and positive approach to release personnel while at the same time retaining personnel critical to timely and safe completion of the work scope. In May 2011, WCH produced the people plan, a program that maximizes communicationmore » and support for employees being released, provides an incentivization strategy to retain personnel to the end of their assignments, and reflects a sensitivity to the long-term goals of the contract and WCH's parent companies. The combination of all of these efforts equal one thing: treating employees with respect by providing specific information in a timely manner; respecting employees by sharing as much information as possible, as soon as possible, with as much detail as possible; and respecting each individual's ability to be in control of their next step in their life or career. The project is only in the second ORW and has 13 more before the end of the contract. That time remaining will continue to bring new challenges and unknowns, but the confidence and trust of the employees is proving to be solid. This is largely as a result of the stability provided by the people plan program. A success that can only truly be measured by the continued positive response it has already received from WCH's employees. (authors)« less

  12. Increased respiratory neural drive and work of breathing in exercise-induced laryngeal obstruction.

    PubMed

    Walsted, Emil S; Faisal, Azmy; Jolley, Caroline J; Swanton, Laura L; Pavitt, Matthew J; Luo, Yuan-Ming; Backer, Vibeke; Polkey, Michael I; Hull, James H

    2018-02-01

    Exercise-induced laryngeal obstruction (EILO), a phenomenon in which the larynx closes inappropriately during physical activity, is a prevalent cause of exertional dyspnea in young individuals. The physiological ventilatory impact of EILO and its relationship to dyspnea are poorly understood. The objective of this study was to evaluate exercise-related changes in laryngeal aperture on ventilation, pulmonary mechanics, and respiratory neural drive. We prospectively evaluated 12 subjects (6 with EILO and 6 healthy age- and gender-matched controls). Subjects underwent baseline spirometry and a symptom-limited incremental exercise test with simultaneous and synchronized recording of endoscopic video and gastric, esophageal, and transdiaphragmatic pressures, diaphragm electromyography, and respiratory airflow. The EILO and control groups had similar peak work rates and minute ventilation (V̇e) (work rate: 227 ± 35 vs. 237 ± 35 W; V̇e: 103 ± 20 vs. 98 ± 23 l/min; P > 0.05). At submaximal work rates (140-240 W), subjects with EILO demonstrated increased work of breathing ( P < 0.05) and respiratory neural drive ( P < 0.05), developing in close temporal association with onset of endoscopic evidence of laryngeal closure ( P < 0.05). Unexpectedly, a ventilatory increase ( P < 0.05), driven by augmented tidal volume ( P < 0.05), was seen in subjects with EILO before the onset of laryngeal closure; there were however no differences in dyspnea intensity between groups. Using simultaneous measurements of respiratory mechanics and diaphragm electromyography with endoscopic video, we demonstrate, for the first time, increased work of breathing and respiratory neural drive in association with the development of EILO. Future detailed investigations are now needed to understand the role of upper airway closure in causing exertional dyspnea and exercise limitation. NEW & NOTEWORTHY Exercise-induced laryngeal obstruction is a prevalent cause of exertional dyspnea in young individuals; yet, how laryngeal closure affects breathing is unknown. In this study we synchronized endoscopic video with respiratory physiological measurements, thus providing the first detailed commensurate assessment of respiratory mechanics and neural drive in relation to laryngeal closure. Laryngeal closure was associated with increased work of breathing and respiratory neural drive preceded by an augmented tidal volume and a rise in minute ventilation.

  13. The Work by Giulio Ceradini in Explaining the Mechanism of Semilunar Cardiac Valve Function

    ERIC Educational Resources Information Center

    Troiani, Diana; Manni, Ermanno

    2011-01-01

    Using an excised pig heart preparation with tubes, a manometer, and a visualizing apparatus, Giulio Ceradini, an Italian physiologist working in the years of 1871-1872 in Carl Ludwig's famous laboratory in Leipzig, Germany, illustrated the mechanism of closure of the semilunar valves. He was the first to conceive that the closure of the heart…

  14. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  15. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Treesearch

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  16. Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  17. Strategic Planning: Renewal and Redesign during Turbulent Times

    ERIC Educational Resources Information Center

    Cherrey, Cynthia; Clark, Evette Castillo

    2010-01-01

    In August 2005, Hurricane Katrina, the worst natural disaster in the history of the United States, forced the fall semester closure of Tulane University in New Orleans, Louisiana. In the aftermath of this unprecedented storm, the Tulane leadership set forth a plan for renewal to secure the survival, recovery, and sustainability of the institution,…

  18. 75 FR 6597 - Determination to Approve Alternative Final Cover Request for the Lake County, MT Landfill...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... layer, a 24-inch native sand layer, an 18-inch imported silt evapotranspiration layer, and a 6-inch... Quality Assurance & Control Plan'' for the closure project that specifies that testing will be performed... described in detail in the ``Construction Quality Assurance & Control Plan.'' II. EPA's Action A...

  19. Incorporating Conservation Zone Effectiveness for Protecting Biodiversity in Marine Planning

    PubMed Central

    Makino, Azusa; Klein, Carissa J.; Beger, Maria; Jupiter, Stacy D.; Possingham, Hugh P.

    2013-01-01

    Establishing different types of conservation zones is becoming commonplace. However, spatial prioritization methods that can accommodate multiple zones are poorly understood in theory and application. It is typically assumed that management regulations across zones have differential levels of effectiveness (“zone effectiveness”) for biodiversity protection, but the influence of zone effectiveness on achieving conservation targets has not yet been explored. Here, we consider the zone effectiveness of three zones: permanent closure, partial protection, and open, for planning for the protection of five different marine habitats in the Vatu-i-Ra Seascape, Fiji. We explore the impact of differential zone effectiveness on the location and costs of conservation priorities. We assume that permanent closure zones are fully effective at protecting all habitats, open zones do not contribute towards the conservation targets and partial protection zones lie between these two extremes. We use four different estimates for zone effectiveness and three different estimates for zone cost of the partial protection zone. To enhance the practical utility of the approach, we also explore how much of each traditional fishing ground can remain open for fishing while still achieving conservation targets. Our results show that all of the high priority areas for permanent closure zones would not be a high priority when the zone effectiveness of the partial protection zone is equal to that of permanent closure zones. When differential zone effectiveness and costs are considered, the resulting marine protected area network consequently increases in size, with more area allocated to permanent closure zones to meet conservation targets. By distributing the loss of fishing opportunity equitably among local communities, we find that 84–88% of each traditional fishing ground can be left open while still meeting conservation targets. Finally, we summarize the steps for developing marine zoning that accounts for zone effectiveness. PMID:24223870

  20. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Julianne J.; Nikolich, George; Mizell, Steve

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are beingmore » developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.« less

  1. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  2. Combined orthodontic-restorative management of maxillary central incisors lost following traumatic injury: a case report.

    PubMed

    Fleming, Padhraig S; Seehra, Jadbinder; Dibiase, Andrew T

    2011-01-01

    A history of traumatic dental injury to the maxillary central incisors during preadolescence or adolescence is common and may result in premature loss. Treatment options include prosthetic implant replacement, autotransplantation, and orthodontic space closure with direct composite recontouring. This case report describes the treatment of an adolescent girl who presented with a crowded Class I malocclusion complicated by a history of trauma to the maxillary central incisors. The treatment plan consisted of orthodontic space closure following loss of both maxillary central incisors and mandibular premolars. This case highlights that orthodontic space closure can be a valuable treatment option in selected Class I crowded and Class II uncrowded malocclusions, producing predictable and efficient results.

  3. Development of uniform standards for allowable lane closure : final report, September 2008.

    DOT National Transportation Integrated Search

    2008-09-01

    Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...

  4. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less

  5. A Scandcleft randomised trials of primary surgery for unilateral cleft lip and palate: 1. Planning and management.

    PubMed

    Semb, Gunvor; Enemark, Hans; Friede, Hans; Paulin, Gunnar; Lilja, Jan; Rautio, Jorma; Andersen, Mikael; Åbyholm, Frank; Lohmander, Anette; Shaw, William; Mølsted, Kirsten; Heliövaara, Arja; Bolund, Stig; Hukki, Jyri; Vindenes, Hallvard; Davenport, Peter; Arctander, Kjartan; Larson, Ola; Berggren, Anders; Whitby, David; Leonard, Alan; Neovius, Erik; Elander, Anna; Willadsen, Elisabeth; Bannister, R Patricia; Bradbury, Eileen; Henningsson, Gunilla; Persson, Christina; Eyres, Philip; Emborg, Berit; Kisling-Møller, Mia; Küseler, Annelise; Granhof Black, Birthe; Schöps, Antje; Bau, Anja; Boers, Maria; Andersen, Helene Søgaard; Jeppesen, Karin; Marxen, Dorte; Paaso, Marjukka; Hölttä, Elina; Alaluusua, Suvi; Turunen, Leena; Humerinta, Kirsti; Elfving-Little, Ulla; Tørdal, Inger Beate; Kjøll, Lillian; Aukner, Ragnhild; Hide, Øydis; Feragen, Kristin Billaud; Rønning, Elisabeth; Skaare, Pål; Brinck, Eli; Semmingsen, Ann-Magritt; Lindberg, Nina; Bowden, Melanie; Davies, Julie; Mooney, Jeanette; Bellardie, Haydn; Schofield, Nina; Nyberg, Jill; Lundberg, Maria; Karsten, Agneta Linder-Aronson; Larson, Margareta; Holmefjord, Anders; Reisæter, Sigvor; Pedersen, Nina-Helen; Rasmussen, Therese; Tindlund, Rolf; Sæle, Paul; Blomhoff, Reidunn; Jacobsen, Gry; Havstam, Christina; Rizell, Sara; Enocson, Lars; Hagberg, Catharina; Najar Chalien, Midia; Paganini, Anna; Lundeborg, Inger; Marcusson, Agneta; Mjönes, Anna-Britta; Gustavsson, Annica; Hayden, Christine; McAleer, Eilish; Slevan, Emma; Gregg, Terry; Worthington, Helen

    2017-02-01

    Longstanding uncertainty surrounds the selection of surgical protocols for the closure of unilateral cleft lip and palate, and randomised trials have only rarely been performed. This paper is an introduction to three randomised trials of primary surgery for children born with complete unilateral cleft lip and palate (UCLP). It presents the protocol developed for the trials in CONSORT format, and describes the management structure that was developed to achieve the long-term engagement and commitment required to complete the project. Ten established national or regional cleft centres participated. Lip and soft palate closure at 3-4 months, and hard palate closure at 12 months served as a common method in each trial. Trial 1 compared this with hard palate closure at 36 months. Trial 2 compared it with lip closure at 3-4 months and hard and soft palate closure at 12 months. Trial 3 compared it with lip and hard palate closure at 3-4 months and soft palate closure at 12 months. The primary outcomes were speech and dentofacial development, with a series of perioperative and longer-term secondary outcomes. Recruitment of 448 infants took place over a 9-year period, with 99.8% subsequent retention at 5 years. The series of reports that follow this introductory paper include comparisons at age 5 of surgical outcomes, speech outcomes, measures of dentofacial development and appearance, and parental satisfaction. The outcomes recorded and the numbers analysed for each outcome and time point are described in the series. ISRCTN29932826.

  6. Estimation of crown closure from AVIRIS data using regression analysis

    NASA Technical Reports Server (NTRS)

    Staenz, K.; Williams, D. J.; Truchon, M.; Fritz, R.

    1993-01-01

    Crown closure is one of the input parameters used for forest growth and yield modelling. Preliminary work by Staenz et al. indicates that imaging spectrometer data acquired with sensors such as the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) have some potential for estimating crown closure on a stand level. The objectives of this paper are: (1) to establish a relationship between AVIRIS data and the crown closure derived from aerial photography of a forested test site within the Interior Douglas Fir biogeoclimatic zone in British Columbia, Canada; (2) to investigate the impact of atmospheric effects and the forest background on the correlation between AVIRIS data and crown closure estimates; and (3) to improve this relationship using multiple regression analysis.

  7. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  8. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  9. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  10. Three consecutive years of road closures due to natural hazards in the Weisstannen valley, Canton of St-Gallen, Switzerland

    NASA Astrophysics Data System (ADS)

    Voumard, Jérémie; Derron, Marc-Henri; Jaboyedoff, Michel

    2017-04-01

    The Weisstannen small alpine valley located in the Canton of St-Gallen, Switzerland, has been affected by four different natural hazards these three last years. Its unique access road has been cut off height times during this period: by an earth slide in January 2014, by three debris flows in August 2015, by one debris flow in September 2016, by two floods in June and July 2016 and by a rockfall in May 2016. Although the valley is sparsely populated, 240 people have been affected by the height road closures due to these events. In addition to road damages, several buildings, of which a restaurant (with EUR 190'000 damages) and an animal shelter, have been damaged. In Switzerland, some roads of 15 communes have been affected by natural hazards at least three times in five years (2012-2016). Then the Weisstannen valley is not an exception at the communal level. However, it is the only valley whose unique access was cut off three consecutive years. With these repeated events, the population of the valley does not understand how possible it is to end up in such a situation in a country accustomed to natural hazards. In the media and social media, people do not hide their irritation regarding to this situation: "Have the authorities failed to take into account natural dangers despite of the 4.7 million Euro allocated for a flood protection project? Who is responsible of those repeated damages? Why the situation did not improve after the events of the first year and then the second year? ". In the present work, we try to shed the light on this peculiar case analysing the causes of road closures, studying meteorological, topographical, hydrological and geological data for each events. The effectiveness of the new protective measures built between the events are assessed, as the future planned protectives measures. Road closures consequences on the population and the economy are also estimated. Finally, we estimate the probability of having new road closures in the Weisstannen valley during the next years. Data about the events were documented during field visit, or obtained from the media and official reports.

  11. System Level Health Disparities in California Emergency Departments: Minorities and Medicaid Patients are at Higher Risk of Losing Their EDs

    PubMed Central

    Hsia, Renee Y.; Srebotnjak, Tanja; Kanzaria, Hemal K.; McCulloch, Charles; Auerbach, Andrew D.

    2015-01-01

    Study Objective Emergency Department (ED) closures threaten community access to emergency services, but few data exist to describe factors associated with closure. We evaluated factors associated with ED closure in California and sought to determine if hospitals serving more vulnerable populations have a higher rate of ED closure. Methods Retrospective cohort study of California hospital EDs between 1998 and 2008, using hospital and patient level data from the California Office of Statewide Planning and Development (OSHPD), as well as OSHPD Patient Discharge Data. We examined the effects of hospital and patient factors on the hospital's likelihood of ED closure using Cox proportional hazards models. Results In 4,411 hospital-years of observation, 29 of 401 (7.2%) EDs closed. In a model adjusted for total ED visits, hospital discharges, trauma center and teaching status, ownership, operating margin, and urbanicity, hospitals with more black patients (OR 1.41 per increase in proportion of blacks by 0.1, 95% CI 1.16-1.72) and Medi-Cal recipients (OR 1.17 per increase in proportion insured by Medi-Cal by 0.1, 95% CI 1.02-1.34) had higher odds for ED closure, as did for-profit institutions (OR 1.65, 95% CI 1.13-2.41). Conclusion The population served by EDs and hospitals’ profit model are associated with ED closure. Whether our findings are a manifestation of poorer reimbursement in at-risk EDs is unclear. PMID:22093435

  12. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butcher, T.; Swingle, R.; Crapse, K.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less

  13. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  14. Diastema: correction of excessive spaces in the esthetic zone.

    PubMed

    Oquendo, Anabella; Brea, Luis; David, Steven

    2011-04-01

    The presence of a diastema or diastemata between teeth is a common feature found in the anterior dentition. Many forms of therapy can be used for diastema closure. A carefully developed diagnosis and advanced planning allows the most appropriate treatment to be determined for each individual case to address the patient's needs. Clinical considerations, advantages, disadvantages, and alternative treatment modalities for diastema closure are discussed in this article and a clinical case is presented to illustrate the application of these techniques. Copyright © 2011 Elsevier Inc. All rights reserved.

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-05-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

  16. The work by Giulio Ceradini in explaining the mechanism of semilunar cardiac valve function.

    PubMed

    Troiani, Diana; Manni, Ermanno

    2011-06-01

    Using an excised pig heart preparation with tubes, a manometer, and a visualizing apparatus, Giulio Ceradini, an Italian physiologist working in the years of 1871-1872 in Carl Ludwig's famous laboratory in Leipzig, Germany, illustrated the mechanism of closure of the semilunar valves. He was the first to conceive that the closure of the heart valves depends not on a static back pressure nor upon eddies but is primarily the consequence of the decelerated systolic efflux. This pioneer research of Ceradini was first published in German in 1872 (4). The purpose of the present report is to revisit Ceradini's pioneering experiments and his interpretation of heart valve closure, which remains as true as it was in 1872.

  17. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  18. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  19. National Wind Tunnel Complex (NWTC)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

  20. Wound Complication Rates After Staples or Suture for Midline Vertical Skin Closure in Obese Women: A Randomized Controlled Trial.

    PubMed

    Kuroki, Lindsay M; Mullen, Mary M; Massad, L Stewart; Wu, Ningying; Liu, Jingxia; Mutch, David G; Powell, Matthew A; Hagemann, Andrea R; Thaker, Premal H; McCourt, Carolyn K; Novetsky, Akiva P

    2017-07-01

    To compare wound complication rates after skin closure with staples and subcuticular suture in obese gynecology patients undergoing laparotomy through a midline vertical incision. In this randomized controlled trial, women with body mass indexes (BMIs) of 30 or greater undergoing surgery by a gynecologic oncologist through a midline vertical incision were randomized to skin closure with staples or subcuticular 4-0 monofilament suture. The primary outcome was the rate of wound complication, defined as the presence of a wound breakdown, or infection, within 8 weeks postoperatively. Secondary outcomes included operative time, Stony Brook scar cosmetic score, and patient satisfaction. A sample size of 162 was planned to detect a 50% reduction in wound complications. At planned interim review (n=82), there was no significant difference in primary outcome. Between 2013 and 2016, 163 women were analyzed, including 84 who received staples and 79 suture. Women who received staples were older (mean age 59 compared with 57 years), had lower mean BMI (37.3 compared with 38.9), and fewer benign indications for surgery (22 compared with 27). There were no differences in wound complication rates between staple compared with suture skin closure (28 [33%] compared with 25 [32%], relative risk 1.05, 95% confidence interval [CI] 0.68-1.64). Women with staples reported worse median cosmetic scores (four of five compared with five of five, P<.001), darker scar color (37 [49%] compared with 13 [18%], relative risk 2.69, 95% CI 1.57-4.63), and more skin marks (30 [40%] compared with three [4%], relative risk 9.47, 95% CI 3.02-29.65) compared with women with suture closure. There was no group difference regarding satisfaction with their scar. Stepwise multivariate analysis revealed BMI (odds ratio [OR] 1.13, 95% CI 1.07-1.20), maximum postoperative glucose (OR 1.01, 95% CI 1.00-1.01), and cigarette smoking (OR 4.96, 95% CI 1.32-18.71) were correlates of wound complication. Closure of midline vertical skin incisions with subcuticular suture does not reduce surgical site wound complications compared with staples in obese gynecology patients. ClinicalTrials.gov, NCT01977612.

  1. Closure behavior of spherical void in slab during hot rolling process

    NASA Astrophysics Data System (ADS)

    Cheng, Rong; Zhang, Jiongming; Wang, Bo

    2018-04-01

    The mechanical properties of steels are heavily deteriorated by voids. The influence of voids on the product quality should be eliminated through rolling processes. The study on the void closure during hot rolling processes is necessary. In present work, the closure behavior of voids at the center of a slab at 800 °C during hot rolling processes has been simulated with a 3D finite element model. The shape of the void and the plastic strain distribution of the slab are obtained by this model. The void decreases along the slab thickness direction and spreads along the rolling direction but hardly changes along the strip width direction. The relationship between closure behavior of voids and the plastic strain at the center of the slab is analyzed. The effects of rolling reduction, slab thickness and roller diameter on the closure behavior of voids are discussed. The larger reduction, thinner slab and larger roller diameter all improve the closure of voids during hot rolling processes. Experimental results of the closure behavior of a void in the slab during hot rolling process mostly agree with the simulation results..

  2. Enhancement of a network analysis tool to accommodate multiple construction work zone analysis (initial investigation).

    DOT National Transportation Integrated Search

    2010-08-30

    A major issue in transportation projects is capacity reduction due to lane closures. Calculating capacity for a specific project can be done using information from the Highway Capacity Manual, but how often should a lane closure be expected is still ...

  3. 40 CFR 280.71 - Permanent closure and changes-in-service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Permanent closure and changes-in-service. 280.71 Section 280.71 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... for Occupational Safety and Health “Criteria for a Recommended Standard * * * Working in Confined...

  4. A Basis for Excellence: A Plan for the Development of Learning Resource Services. To Accommodate the Northridge and Riverside Campuses: To Develop Collections at Southwest Center, Rutherford and 620 Oaks; To Improve Student Access to the LRS Collections.

    ERIC Educational Resources Information Center

    Hisle, W. Lee; And Others

    Designed by Austin Community College's (ACC's) Learning Resource Services (LRS) Management Team, this plan explores the development of the LRS in preparation for the 1989 closure of the college's Ridgeview (RDV) campus, and the opening of the Northridge (NRG) and Riverside (RVS) campuses. First, the plan's executive summary lays out…

  5. [Closure of wide patent ductus arteriosus using a fenestrated muscular VSD occluder device in a pediatric patient with Down syndrome and pulmonary hypertension].

    PubMed

    Güvenç, Osman; Saygı, Murat; Demir, İbrahim Halil; Ödemiş, Ender

    2017-06-01

    Patients with wide patent ductus arteriosus and significant pulmonary hypertension not treated in time constitute a significant problem for cardiologists. For these patients, tests that could aid in decision-making for further planning include reversibility and balloon occlusion tests performed in the catheterization laboratory. Devices developed for the closure of ductus as well as different devices with off-label use may be employed in patients scheduled for transcatheter occlusion. When result of reversibility test is borderline positive, the use of fenestrated device may be applicable for selected patients. Presently described is case of a 10-year-old patient with Down syndrome who had a wide ductus and systemic pulmonary hypertension. Transcatheter closure procedure was performed with off-label use of a fenestrated muscular ventricular septal defect occluder device.

  6. Extra-Credential Experiences and Social Closure: Working-Class Students at University

    ERIC Educational Resources Information Center

    Lehmann, Wolfgang

    2012-01-01

    Human capital theorists perceive of educational expansion as beneficial to individuals, corporations and national economies, while social closure theorists have claimed that inflation of credential requirements maintains traditional status inequalities. In this paper I argue that status inequalities are not only maintained by credential inflation,…

  7. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below themore » Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action.« less

  8. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less

  9. A Crack Closure Model and Its Application to Vibrothermography Nondestructive Evaluation

    NASA Astrophysics Data System (ADS)

    Schiefelbein, Bryan Edward

    Vibrothermography nondestructive evaluation (NDE) is in the early stages of research and development, and there exists uncertainty in the fundamental mechanisms and processes by which heat generation occurs. Holland et al. have developed a set of tools which simulate and predict the outcome of a vibrothermography inspection by breaking the inspection into three distinct processes: vibrational excitation, heat generation, and thermal imaging. The stage of vibrothermography which is not well understood is the process by which vibrations are converted to heat at the crack surface. It has been shown that crack closure and closure state impact the resulting heat generation. Despite this, research into the link between partial crack closure and vibrothermography is limited. This work seeks to rectify this gap in knowledge by modeling the behavior of a partially closed crack in response to static external loading and a dynamic vibration. The residual strains left by the plastic wake during fatigue crack growth manifest themselves as contact stresses acting at the crack surface interface. In response to an applied load below the crack opening stress, the crack closure state will evolve, but the crack will remain partially closed. The crack closure model developed in this work is based in linear elastic fracture mechanics (LEFM) and describes the behavior of a partially closed crack in response to a tensile external load and non-uniform closure stress distribution. The model builds on work by Fleck to describe the effective length, crack opening displacement, and crack tip stress field for a partially closed crack. These quantities are solved for by first establishing an equilibrium condition which governs the effective or apparent length of the partially closed crack. The equilibrium condition states that, under any external or crack surface loading, the effective crack tip will be located where the effective stress intensity factor is zero. In LEFM, this is equivalent to saying that the effective crack tip is located where the stress singularity vanishes. If the closure stresses are unknown, the model provides an algorithm with which to solve for the distribution, given measurements of the effective crack length as a function of external load. Within literature, a number of heating mechanisms have been proposed as being dominant in vibrothermography. These include strain hysteresis, adhesion hysteresis, plastic flow, thermoelasticity, and sliding friction. Based on experimental observation and theory, this work eliminates strain hysteresis, thermoelasticity, and plastic flow as plausible heating mechanisms. This leaves friction and adhesion hysteresis as the only plausible mechanisms. Frictional heating is based on the classical Coulomb friction model, while adhesion hysteresis heating comes from irreversibility in surface adhesion. Adhesion hysteresis only satisfies the experimental observation that heating vanishes for high compressive loading if surface roughness and the instability of surface adhesion is considered. By understanding the fundamental behavior of a partially closed crack in response to non-uniform loading, and the link between crack surface motion and heat generation, we are one step closer to a fully predictive vibrothermography heat generation model. Future work is needed to extend the crack closure model to a two-dimensional semi-elliptical surface crack and better understand the distinction between frictional and adhesion heating.

  10. Health care logistics: who has the ball during disaster?

    PubMed

    Vanvactor, Jerry D

    2011-05-10

    In contemporary organizations, a wide gamut of options is available for sustaining and supporting health care operations. When disaster strikes, despite having tenable plans for routine replenishment and operations, many organizations find themselves ill-prepared, ill-equipped, and without effective mechanisms in place to sustain operations during the immediate aftermath of a crisis. Health care operations can be abruptly halted due to the non-availability of supply. The purpose of this work is to add to a necessary, growing body of works related specifically to health care logistics preparedness and disaster mitigation. Logistics management is a specialized genre of expertise within the health care industry and is largely contributive to the success or failure of health care organizations. Logistics management requires extensive collaboration among multiple stakeholders-internal and external to an organization. Effective processes and procedures can be largely contributive to the success or failure of organizational operations. This article contributes to the closure of an obvious gap in professional and academic literature related to disaster health care logistics management and provides timely insight into a potential problem for leaders industry-wide. One critical aspect of disaster planning is regard for competent logistics management and the effective provision of necessary items when they are needed most. In many communities, there seems to be little evidence available regarding health care logistics involvement in disaster planning; at times, evidence of planning efforts perceptibly end at intra-organizational doors within facilities. Strategic planners are being continually reminded that health care organizations serve a principal role in emergency preparedness planning and must be prepared to fulfill the associated possibilities without notification. The concern is that not enough attention is being paid to repeated lessons being observed in disasters and emergency events.

  11. Health care logistics: who has the ball during disaster?

    PubMed Central

    VanVactor, Jerry D.

    2011-01-01

    In contemporary organizations, a wide gamut of options is available for sustaining and supporting health care operations. When disaster strikes, despite having tenable plans for routine replenishment and operations, many organizations find themselves ill-prepared, ill-equipped, and without effective mechanisms in place to sustain operations during the immediate aftermath of a crisis. Health care operations can be abruptly halted due to the non-availability of supply. The purpose of this work is to add to a necessary, growing body of works related specifically to health care logistics preparedness and disaster mitigation. Logistics management is a specialized genre of expertise within the health care industry and is largely contributive to the success or failure of health care organizations. Logistics management requires extensive collaboration among multiple stakeholders—internal and external to an organization. Effective processes and procedures can be largely contributive to the success or failure of organizational operations. This article contributes to the closure of an obvious gap in professional and academic literature related to disaster health care logistics management and provides timely insight into a potential problem for leaders industry-wide. One critical aspect of disaster planning is regard for competent logistics management and the effective provision of necessary items when they are needed most. In many communities, there seems to be little evidence available regarding health care logistics involvement in disaster planning; at times, evidence of planning efforts perceptibly end at intra-organizational doors within facilities. Strategic planners are being continually reminded that health care organizations serve a principal role in emergency preparedness planning and must be prepared to fulfill the associated possibilities without notification. The concern is that not enough attention is being paid to repeated lessons being observed in disasters and emergency events. PMID:24149034

  12. NIMROD Modeling of Sawtooth Modes Using Hot-Particle Closures

    NASA Astrophysics Data System (ADS)

    Kruger, Scott; Jenkins, T. G.; Held, E. D.; King, J. R.

    2015-11-01

    In DIII-D shot 96043, RF heating gives rise to an energetic ion population that alters the sawtooth stability boundary, replacing conventional sawtooth cycles by longer-period, larger-amplitude `giant sawtooth' oscillations. We explore the use of particle-in-cell closures within the NIMROD code to numerically represent the RF-induced hot-particle distribution, and investigate the role of this distribution in determining the altered mode onset threshold and subsequent nonlinear evolution. Equilibrium reconstructions from the experimental data are used to enable these detailed validation studies. Effects of other parameters on the sawtooth behavior, such as the plasma Lundquist number and hot-particle beta-fraction, are also considered. The fast energetic particles present many challenges for the PIC closure. We review new algorithm and performance improvements to address these challenges, and provide a preliminary assessment of the efficacy of the PIC closure versus a continuum model for energetic particle modeling. We also compare our results with those of, and discuss plans for a more complete validation campaign for this discharge. Supported by US Department of Energy via the SciDAC Center for Extended MHD Modeling (CEMM).

  13. Utility and Scope of Rapid Prototyping in Patients with Complex Muscular Ventricular Septal Defects or Double-Outlet Right Ventricle: Does it Alter Management Decisions?

    PubMed

    Bhatla, Puneet; Tretter, Justin T; Ludomirsky, Achi; Argilla, Michael; Latson, Larry A; Chakravarti, Sujata; Barker, Piers C; Yoo, Shi-Joon; McElhinney, Doff B; Wake, Nicole; Mosca, Ralph S

    2017-01-01

    Rapid prototyping facilitates comprehension of complex cardiac anatomy. However, determining when this additional information proves instrumental in patient management remains a challenge. We describe our experience with patient-specific anatomic models created using rapid prototyping from various imaging modalities, suggesting their utility in surgical and interventional planning in congenital heart disease (CHD). Virtual and physical 3-dimensional (3D) models were generated from CT or MRI data, using commercially available software for patients with complex muscular ventricular septal defects (CMVSD) and double-outlet right ventricle (DORV). Six patients with complex anatomy and uncertainty of the optimal management strategy were included in this study. The models were subsequently used to guide management decisions, and the outcomes reviewed. 3D models clearly demonstrated the complex intra-cardiac anatomy in all six patients and were utilized to guide management decisions. In the three patients with CMVSD, one underwent successful endovascular device closure following a prior failed attempt at transcatheter closure, and the other two underwent successful primary surgical closure with the aid of 3D models. In all three cases of DORV, the models provided better anatomic delineation and additional information that altered or confirmed the surgical plan. Patient-specific 3D heart models show promise in accurately defining intra-cardiac anatomy in CHD, specifically CMVSD and DORV. We believe these models improve understanding of the complex anatomical spatial relationships in these defects and provide additional insight for pre/intra-interventional management and surgical planning.

  14. Analytic closures for M1 neutrino transport

    DOE PAGES

    Murchikova, E. M.; Abdikamalov, E.; Urbatsch, T.

    2017-04-25

    Carefully accounting for neutrino transport is an essential component of many astrophysical studies. Solving the full transport equation is too expensive for most realistic applications, especially those involving multiple spatial dimensions. For such cases, resorting to approximations is often the only viable option for obtaining solutions. One such approximation, which recently became popular, is the M1 method. It utilizes the system of the lowest two moments of the transport equation and closes the system with an ad hoc closure relation. The accuracy of the M1 solution depends on the quality of the closure. Several closures have been proposed in themore » literature and have been used in various studies. We carry out an extensive study of these closures by comparing the results of M1 calculations with precise Monte Carlo calculations of the radiation field around spherically symmetric protoneutron star models. We find that no closure performs consistently better or worse than others in all cases. The level of accuracy that a given closure yields depends on the matter configuration, neutrino type and neutrino energy. As a result, given this limitation, the maximum entropy closure by Minerbo on average yields relatively accurate results in the broadest set of cases considered in this work.« less

  15. 24 CFR 586.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES REVITALIZING BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT... Response, Compensation, and Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the...

  16. Patient Satisfaction After Femoral Arterial Access Site Closure Using the ExoSeal{sup ®} Vascular Closure Device Compared to Manual Compression: A Prospective Intra-individual Comparative Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pieper, Claus Christian, E-mail: claus.christian.pieper@ukb.uni-bonn.de; Thomas, Daniel, E-mail: daniel.thomas@ukb.uni-bonn.de; Nadal, Jennifer, E-mail: jennifer.nadal@ukb.uni-bonn.de

    PurposeTo intra-individually compare discomfort levels and patient satisfaction after arterial access closure using the ExoSeal{sup ®} vascular closure device (VCD) and manual compression (MC) in a prospective study design.MethodsPatients undergoing two planned interventions from 07/2013 to 09/2014 could participate in the study. Access closure was performed with an ExoSeal{sup ®}-VCD in one and MC in the other intervention. Patients were clinically and sonographically examined and were given questionnaires 1 day after intervention [groin- and back-pain during bedrest (100-point visual analog scale; 0: no pain); comfortability of bedrest (10-point Likert scale, 1: comfortable), satisfaction with closure (10-point Likert scale, 1: very satisfied)].more » Results were analyzed in a cross-over design.Results48 patients (29 male, median age 62.5 (32–88) years) were included. An ExoSeal{sup ®}-VCD was used first in 25 cases. As four of these subsequently refused MC as second intervention, data from 44 patients could be analyzed. All closures were technically successful (successful device deployment) without major complications. Groin- and back-pain after VCD-use/MC was 0 (0–15) vs. 10 (0–80) and 0 (0–75) vs. 25 (0–90), respectively (p < 0.0001). Bedrest after VCD-use was more comfortable than after MC [1 (range 1–7) vs. 6 (2–10); p < 0.0001]. Satisfaction with the closure procedure and with the intervention in general was higher after VCD-use compared to MC [1 (1–3) vs. 5 (2–10) and 1 (1–2) vs. 2 (1–4), respectively; p < 0.0001].ConclusionIntra-individual comparison showed pain levels and discomfort to be significantly lower after ExoSeal{sup ®} use compared to MC. VCD closure was associated with higher satisfaction both with the closure itself and with the intervention in general.« less

  17. From Castalia to Wikipedia: Openness and Closure in Knowledge Communities

    ERIC Educational Resources Information Center

    Roberts, Peter; Peters, Michael A.

    2011-01-01

    This article explores different forms of openness and closure in two knowledge communities: the fictional world of Castalia in Hermann Hesse's great work "The Glass Bead Game", and the twenty-first-century cyberspatial universe of Wikipedia. These two worlds differ in some important respects, but they also share a number of educationally…

  18. 10 CFR 63.113 - Performance objectives for the geologic repository after permanent closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Performance objectives for the geologic repository after permanent closure. 63.113 Section 63.113 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH... and an engineered barrier system. (b) The engineered barrier system must be designed so that, working...

  19. 10 CFR 63.113 - Performance objectives for the geologic repository after permanent closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Performance objectives for the geologic repository after permanent closure. 63.113 Section 63.113 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH... and an engineered barrier system. (b) The engineered barrier system must be designed so that, working...

  20. 10 CFR 63.113 - Performance objectives for the geologic repository after permanent closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Performance objectives for the geologic repository after permanent closure. 63.113 Section 63.113 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH... and an engineered barrier system. (b) The engineered barrier system must be designed so that, working...

  1. 10 CFR 63.113 - Performance objectives for the geologic repository after permanent closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Performance objectives for the geologic repository after permanent closure. 63.113 Section 63.113 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH... and an engineered barrier system. (b) The engineered barrier system must be designed so that, working...

  2. Competitive Employment for People with Autism: Correlates of Successful Closure in Competitive and Supported Employment

    ERIC Educational Resources Information Center

    Schaller, James; Yang, Nancy K.

    2005-01-01

    Differences in rates of case closure, case service cost, hours worked per week, and weekly wage between customers with autism closed successfully in competitive employment and supported employment were found using the Rehabilitation Service Administration national database of 2001. Using logistic regression, customer demographic variables related…

  3. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiSalvo, Rick; Surovchak, Scott; Spreng, Carl

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less

  4. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  5. Infering and Calibrating Triadic Closure in a Dynamic Network

    NASA Astrophysics Data System (ADS)

    Mantzaris, Alexander V.; Higham, Desmond J.

    In the social sciences, the hypothesis of triadic closure contends that new links in a social contact network arise preferentially between those who currently share neighbours. Here, in a proof-of-principle study, we show how to calibrate a recently proposed evolving network model to time-dependent connectivity data. The probabilistic edge birth rate in the model contains a triadic closure term, so we are also able to assess statistically the evidence for this effect. The approach is shown to work on data generated synthetically from the model. We then apply this methodology to some real, large-scale data that records the build up of connections in a business-related social networking site, and find evidence for triadic closure.

  6. Why do nursing homes close? An analysis of newspaper articles.

    PubMed

    Fisher, Andrew; Castle, Nicholas

    2012-01-01

    Using Non-numerical Unstructured Data Indexing Searching and Theorizing (NUD'IST) software to extract and examine keywords from text, the authors explored the phenomenon of nursing home closure through an analysis of 30 major-market newspapers over a period of 66 months (January 1, 1999 to June 1, 2005). Newspaper articles typically represent a careful analysis of staff impressions via interviews, managerial perspectives, and financial records review. There is a current reliance on the synthesis of information from large regulatory databases such as the Online Survey Certification And Reporting database, the California Office of Statewide Healthcare Planning and Development database, and Area Resource Files. Although such databases permit the construction of studies capable of revealing some reasons for nursing home closure, they are hampered by the confines of the data entered. Using our analysis of newspaper articles, the authors are able to add further to their understanding of nursing home closures.

  7. Implementation of parallel moment equations in NIMROD

    NASA Astrophysics Data System (ADS)

    Lee, Hankyu Q.; Held, Eric D.; Ji, Jeong-Young

    2017-10-01

    As collisionality is low (the Knudsen number is large) in many plasma applications, kinetic effects become important, particularly in parallel dynamics for magnetized plasmas. Fluid models can capture some kinetic effects when integral parallel closures are adopted. The adiabatic and linear approximations are used in solving general moment equations to obtain the integral closures. In this work, we present an effort to incorporate non-adiabatic (time-dependent) and nonlinear effects into parallel closures. Instead of analytically solving the approximate moment system, we implement exact parallel moment equations in the NIMROD fluid code. The moment code is expected to provide a natural convergence scheme by increasing the number of moments. Work in collaboration with the PSI Center and supported by the U.S. DOE under Grant Nos. DE-SC0014033, DE-SC0016256, and DE-FG02-04ER54746.

  8. 77 FR 58352 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ..., closures and coils and from graphic arts operations and the provision of sampling and testing facilities...; SDCAPCD Rule 67.16, Metal Container, Graphic Arts Operations; MBUAPCD Rule 205, Provision of Sampling and...

  9. Fort Ord Redevelopment: Coordinating Transportation and Land Use Planning

    DOT National Transportation Integrated Search

    1999-01-01

    The closure of military bases and conversion to civilian land uses is a challenging task faced by many small communities throughout the nation. Fort Ord is located in Monterey County, California and encompasses 28,000 acres of reprogrammed property. ...

  10. 9 CFR 318.301 - Containers and closures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...

  11. 9 CFR 318.301 - Containers and closures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...

  12. 9 CFR 318.301 - Containers and closures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...

  13. 9 CFR 318.301 - Containers and closures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... container integrity. Such an examination should be based upon a statistical sampling plan. (2) All empty... the establishment and the container plant records are made available to Program employees. Additional...

  14. Autonomic Closure for Turbulent Flows Using Approximate Bayesian Computation

    NASA Astrophysics Data System (ADS)

    Doronina, Olga; Christopher, Jason; Hamlington, Peter; Dahm, Werner

    2017-11-01

    Autonomic closure is a new technique for achieving fully adaptive and physically accurate closure of coarse-grained turbulent flow governing equations, such as those solved in large eddy simulations (LES). Although autonomic closure has been shown in recent a priori tests to more accurately represent unclosed terms than do dynamic versions of traditional LES models, the computational cost of the approach makes it challenging to implement for simulations of practical turbulent flows at realistically high Reynolds numbers. The optimization step used in the approach introduces large matrices that must be inverted and is highly memory intensive. In order to reduce memory requirements, here we propose to use approximate Bayesian computation (ABC) in place of the optimization step, thereby yielding a computationally-efficient implementation of autonomic closure that trades memory-intensive for processor-intensive computations. The latter challenge can be overcome as co-processors such as general purpose graphical processing units become increasingly available on current generation petascale and exascale supercomputers. In this work, we outline the formulation of ABC-enabled autonomic closure and present initial results demonstrating the accuracy and computational cost of the approach.

  15. Magnetic resonance imaging study of eye congenital birth defects in mouse model

    PubMed Central

    Tucker, Zachary; Mongan, Maureen; Meng, Qinghang; Xia, Ying

    2017-01-01

    Purpose Embryonic eyelid closure is a well-documented morphogenetic episode in mammalian eye development. Detection of eyelid closure defect in humans is a major challenge because eyelid closure and reopen occur entirely in utero. As a consequence, congenital eye defects that are associated with failure of embryonic eyelid closure remain unknown. To fill the gap, we developed a mouse model of defective eyelid closure. This preliminary work demonstrates that the magnetic resonance imaging (MRI) approach can be used for the detection of extraocular muscle abnormalities in the mouse model. Methods Mice with either normal (Map3k1+/−) or defective (Map3k1−/−) embryonic eyelid closure were used in this study. Images of the extraocular muscles were obtained with a 9.4 T high resolution microimaging MRI system. The extraocular muscles were identified, segmented, and measured in each imaging slice using an in-house program. Results In agreement with histological findings, the imaging data show that mice with defective embryonic eyelid closure develop less extraocular muscle than normal mice. In addition, the size of the eyeballs was noticeably reduced in mice with defective embryonic eyelid closure. Conclusions We demonstrated that MRI can potentially be used for the study of extraocular muscle in the mouse model of the eye open-at-birth defect, despite the lack of specificity of muscle group provided by the current imaging resolution. PMID:28848319

  16. Geospatial Thinking of Information Professionals

    ERIC Educational Resources Information Center

    Bishop, Bradley Wade; Johnston, Melissa P.

    2013-01-01

    Geospatial thinking skills inform a host of library decisions including planning and managing facilities, analyzing service area populations, facility site location, library outlet and service point closures, as well as assisting users with their own geospatial needs. Geospatial thinking includes spatial cognition, spatial reasoning, and knowledge…

  17. Crash analysis of I-64 closure in St. Louis county.

    DOT National Transportation Integrated Search

    2011-08-01

    On January 2, 2008, the Missouri Department of Transportation (MoDOT) closed significant portions of Missouri Interstate 64 : (I-64) in St. Louis County for reconstruction. During the planning stages of this project, the proposal to close all lanes o...

  18. Service in the snow. Maintaining care in rural California.

    PubMed

    Elliott, P

    1993-08-01

    The amount of snow that falls in the Sierras is proof that all is not sunshine in rural northeastern California. Isolation and road closures were just two of the challenges that one home care agency was able to surmount with careful planning.

  19. 75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...

  20. Alarm sensor apparatus for closures

    DOEpatents

    Carlson, James A.; Stoddard, Lawrence M.

    1986-01-01

    An alarm sensor apparatus for closures such as doors and windows, and particularly for closures having loose tolerances such as overhead doors, garage doors or the like, the sensor apparatus comprising a pair of cooperating bracket members, one being attached to the door facing or frame work and the other to the door member, two magnetic sensor elements carried by said bracket members, the bracket members comprising a pair of cooperating orthogonal guide slots and plates and a stop member engageable with one of the sensors for aligning the sensors with respect to each other in all three orthogonal planes when the door is closed.

  1. Efficiently enforcing artisanal fisheries to protect estuarine biodiversity.

    PubMed

    Duarte de Paula Costa, Micheli; Mills, Morena; Richardson, Anthony J; Fuller, Richard A; Muelbert, José H; Possingham, Hugh P

    2018-06-26

    Artisanal fisheries support millions of livelihoods worldwide, yet ineffective enforcement can allow for continued environmental degradation due to overexploitation. Here, we use spatial planning to design an enforcement strategy for a pre-existing spatial closure for artisanal fisheries considering climate variability, existing seasonal fishing closures, representative conservation targets and enforcement costs. We calculated enforcement cost in three ways, based on different assumptions about who could be responsible for monitoring the fishery. We applied this approach in the Patos Lagoon estuary (Brazil), where we found three important results. First, spatial priorities for enforcement were similar under different climate scenarios. Second, we found that the cost and percentage of area enforced varied among scenarios tested by the conservation planning analysis, with only a modest increase in budget needed to incorporate climate variability. Third, we found that spatial priorities for enforcement depend on whether enforcement is carried out by a central authority or by the community itself. Here, we demonstrated a method that can be used to efficiently design enforcement plans, resulting in the conservation of biodiversity and estuarine resources. Also, cost of enforcement can be potentially reduced when fishers are empowered to enforce management within their fishing grounds. © 2018 by the Ecological Society of America.

  2. Scar revision

    PubMed Central

    Sharma, Mohit; Wakure, Abhijeet

    2013-01-01

    Most surgical patients end up with a scar and most of these would want at least some improvement in the appearance of the scar. Using sound techniques for wound closure surgeons can, to a certain extent, prevent suboptimal scars. This article reviews the principles of prevention and treatment of suboptimal scars. Surgical techniques of scar revision, i.e., Z plasty, W plasty, and geometrical broken line closure are described. Post-operative care and other adjuvant therapies of scars are described. A short description of dermabrasion and lasers for management of scars is given. It is hoped that this review helps the surgeon to formulate a comprehensive plan for management of scars of these patients. PMID:24516292

  3. Application of electron closures in extended MHD

    NASA Astrophysics Data System (ADS)

    Held, Eric; Adair, Brett; Taylor, Trevor

    2017-10-01

    Rigorous closure of the extended MHD equations in plasma fluid codes includes the effects of electron heat conduction along perturbed magnetic fields and contributions of the electron collisional friction and stress to the extended Ohms law. In this work we discuss application of a continuum numerical solution to the Chapman-Enskog-like electron drift kinetic equation using the NIMROD code. The implementation is a tightly-coupled fluid/kinetic system that carefully addresses time-centering in the advance of the fluid variables with their kinetically-computed closures. Comparisons of spatial accuracy, computational efficiency and required velocity space resolution are presented for applications involving growing magnetic islands in cylindrical and toroidal geometry. The reduction in parallel heat conduction due to particle trapping in toroidal geometry is emphasized. Work supported by DOE under Grant Nos. DE-FC02-08ER54973 and DE-FG02-04ER54746.

  4. Nonlinear closures for scale separation in supersonic magnetohydrodynamic turbulence

    NASA Astrophysics Data System (ADS)

    Grete, Philipp; Vlaykov, Dimitar G.; Schmidt, Wolfram; Schleicher, Dominik R. G.; Federrath, Christoph

    2015-02-01

    Turbulence in compressible plasma plays a key role in many areas of astrophysics and engineering. The extreme plasma parameters in these environments, e.g. high Reynolds numbers, supersonic and super-Alfvenic flows, however, make direct numerical simulations computationally intractable even for the simplest treatment—magnetohydrodynamics (MHD). To overcome this problem one can use subgrid-scale (SGS) closures—models for the influence of unresolved, subgrid-scales on the resolved ones. In this work we propose and validate a set of constant coefficient closures for the resolved, compressible, ideal MHD equations. The SGS energies are modeled by Smagorinsky-like equilibrium closures. The turbulent stresses and the electromotive force (EMF) are described by expressions that are nonlinear in terms of large scale velocity and magnetic field gradients. To verify the closures we conduct a priori tests over 137 simulation snapshots from two different codes with varying ratios of thermal to magnetic pressure ({{β }p}=0.25,1,2.5,5,25) and sonic Mach numbers ({{M}s}=2,2.5,4). Furthermore, we make a comparison to traditional, phenomenological eddy-viscosity and α -β -γ closures. We find only mediocre performance of the kinetic eddy-viscosity and α -β -γ closures, and that the magnetic eddy-viscosity closure is poorly correlated with the simulation data. Moreover, three of five coefficients of the traditional closures exhibit a significant spread in values. In contrast, our new closures demonstrate consistently high correlations and constant coefficient values over time and over the wide range of parameters tested. Important aspects in compressible MHD turbulence such as the bi-directional energy cascade, turbulent magnetic pressure and proper alignment of the EMF are well described by our new closures.

  5. Role of pseudo-turbulent stresses in shocked particle clouds and construction of surrogate models for closure

    NASA Astrophysics Data System (ADS)

    Sen, O.; Gaul, N. J.; Davis, S.; Choi, K. K.; Jacobs, G.; Udaykumar, H. S.

    2018-05-01

    Macroscale models of shock-particle interactions require closure terms for unresolved solid-fluid momentum and energy transfer. These comprise the effects of mean as well as fluctuating fluid-phase velocity fields in the particle cloud. Mean drag and Reynolds stress equivalent terms (also known as pseudo-turbulent terms) appear in the macroscale equations. Closure laws for the pseudo-turbulent terms are constructed in this work from ensembles of high-fidelity mesoscale simulations. The computations are performed over a wide range of Mach numbers ( M) and particle volume fractions (φ ) and are used to explicitly compute the pseudo-turbulent stresses from the Favre average of the velocity fluctuations in the flow field. The computed stresses are then used as inputs to a Modified Bayesian Kriging method to generate surrogate models. The surrogates can be used as closure models for the pseudo-turbulent terms in macroscale computations of shock-particle interactions. It is found that the kinetic energy associated with the velocity fluctuations is comparable to that of the mean flow—especially for increasing M and φ . This work is a first attempt to quantify and evaluate the effect of velocity fluctuations for problems of shock-particle interactions.

  6. Role of pseudo-turbulent stresses in shocked particle clouds and construction of surrogate models for closure

    NASA Astrophysics Data System (ADS)

    Sen, O.; Gaul, N. J.; Davis, S.; Choi, K. K.; Jacobs, G.; Udaykumar, H. S.

    2018-02-01

    Macroscale models of shock-particle interactions require closure terms for unresolved solid-fluid momentum and energy transfer. These comprise the effects of mean as well as fluctuating fluid-phase velocity fields in the particle cloud. Mean drag and Reynolds stress equivalent terms (also known as pseudo-turbulent terms) appear in the macroscale equations. Closure laws for the pseudo-turbulent terms are constructed in this work from ensembles of high-fidelity mesoscale simulations. The computations are performed over a wide range of Mach numbers (M) and particle volume fractions (φ ) and are used to explicitly compute the pseudo-turbulent stresses from the Favre average of the velocity fluctuations in the flow field. The computed stresses are then used as inputs to a Modified Bayesian Kriging method to generate surrogate models. The surrogates can be used as closure models for the pseudo-turbulent terms in macroscale computations of shock-particle interactions. It is found that the kinetic energy associated with the velocity fluctuations is comparable to that of the mean flow—especially for increasing M and φ . This work is a first attempt to quantify and evaluate the effect of velocity fluctuations for problems of shock-particle interactions.

  7. Machine Learning-based discovery of closures for reduced models of dynamical systems

    NASA Astrophysics Data System (ADS)

    Pan, Shaowu; Duraisamy, Karthik

    2017-11-01

    Despite the successful application of machine learning (ML) in fields such as image processing and speech recognition, only a few attempts has been made toward employing ML to represent the dynamics of complex physical systems. Previous attempts mostly focus on parameter calibration or data-driven augmentation of existing models. In this work we present a ML framework to discover closure terms in reduced models of dynamical systems and provide insights into potential problems associated with data-driven modeling. Based on exact closure models for linear system, we propose a general linear closure framework from viewpoint of optimization. The framework is based on trapezoidal approximation of convolution term. Hyperparameters that need to be determined include temporal length of memory effect, number of sampling points, and dimensions of hidden states. To circumvent the explicit specification of memory effect, a general framework inspired from neural networks is also proposed. We conduct both a priori and posteriori evaluations of the resulting model on a number of non-linear dynamical systems. This work was supported in part by AFOSR under the project ``LES Modeling of Non-local effects using Statistical Coarse-graining'' with Dr. Jean-Luc Cambier as the technical monitor.

  8. Governing Underfunded Tribal Colleges.

    ERIC Educational Resources Information Center

    Ambler, Marjane

    1996-01-01

    Discusses tribal colleges' struggles with lower-than-promised federal appropriations, including difficulties related to governance and planning and the threat of closure. Describes possible alternate means of funding, such as forward funding one year in advance, funding from state governments, and private funding from tribal governments or private…

  9. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less

  10. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure - Using Technology to Prepare for the Next Pandemic.

    PubMed

    Rainey, Jeanette J; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O'Sullivan, Megan

    During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10-18, 2012 teachers' strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process.

  11. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure – Using Technology to Prepare for the Next Pandemic

    PubMed Central

    Rainey, Jeanette J.; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O’Sullivan, Megan

    2016-01-01

    Background During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. Methods As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10–18, 2012 teachers’ strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. Results We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Conclusion Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process. PMID:27655229

  12. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, Gregory

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less

  13. A PDF closure model for compressible turbulent chemically reacting flows

    NASA Technical Reports Server (NTRS)

    Kollmann, W.

    1992-01-01

    The objective of the proposed research project was the analysis of single point closures based on probability density function (pdf) and characteristic functions and the development of a prediction method for the joint velocity-scalar pdf in turbulent reacting flows. Turbulent flows of boundary layer type and stagnation point flows with and without chemical reactions were be calculated as principal applications. Pdf methods for compressible reacting flows were developed and tested in comparison with available experimental data. The research work carried in this project was concentrated on the closure of pdf equations for incompressible and compressible turbulent flows with and without chemical reactions.

  14. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  15. Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Michael Marquand; Little, Bonnie Colleen

    The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid wastemore » was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.« less

  16. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less

  17. Evaluation of New Zealand’s High-Seas Bottom Trawl Closures Using Predictive Habitat Models and Quantitative Risk Assessment

    PubMed Central

    Penney, Andrew J.; Guinotte, John M.

    2013-01-01

    United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas. PMID:24358162

  18. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  19. Evaluation of New Zealand's high-seas bottom trawl closures using predictive habitat models and quantitative risk assessment.

    PubMed

    Penney, Andrew J; Guinotte, John M

    2013-01-01

    United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas.

  20. Chlorella Induces Stomatal Closure via NADPH Oxidase-Dependent ROS Production and Its Effects on Instantaneous Water Use Efficiency in Vicia faba

    PubMed Central

    Li, Yan; Xu, Shan-Shan; Gao, Jing; Pan, Sha; Wang, Gen-Xuan

    2014-01-01

    Reactive oxygen species (ROS) have been established to participate in stomatal closure induced by live microbes and microbe-associated molecular patterns (MAMPs). Chlorella as a beneficial microorganism can be expected to trigger stomatal closure via ROS production. Here, we reported that Chlorella induced stomatal closure in a dose-and time-dependent manner in epidermal peels of Vicia faba. Using pharmacological methods in this work, we found that the Chlorella-induced stomatal closure was almost completely abolished by a hydrogen peroxide (H2O2) scavenger, catalase (CAT), significantly suppressed by an NADPH oxidase inhibitor, diphenylene iodonium chloride (DPI), and slightly affected by a peroxidase inhibitor, salicylhydroxamic acid (SHAM), suggesting that ROS production involved in Chlorella-induced stomatal closure is mainly mediated by DPI-sensitive NADPH oxidase. Additionally, Exogenous application of optimal concentrations of Chlorella suspension improved instantaneous water use efficiency (WUEi) in Vicia faba via a reduction in leaf transpiration rate (E) without a parallel reduction in net photosynthetic rate (Pn) assessed by gas-exchange measurements. The chlorophyll fluorescence and content analysis further demonstrated that short-term use of Chlorella did not influence plant photosynthetic reactions center. These results preliminarily reveal that Chlorella can trigger stomatal closure via NADPH oxidase-dependent ROS production in epidermal strips and improve WUEi in leave levels. PMID:24687099

  1. Chlorella induces stomatal closure via NADPH oxidase-dependent ROS production and its effects on instantaneous water use efficiency in Vicia faba.

    PubMed

    Li, Yan; Xu, Shan-Shan; Gao, Jing; Pan, Sha; Wang, Gen-Xuan

    2014-01-01

    Reactive oxygen species (ROS) have been established to participate in stomatal closure induced by live microbes and microbe-associated molecular patterns (MAMPs). Chlorella as a beneficial microorganism can be expected to trigger stomatal closure via ROS production. Here, we reported that Chlorella induced stomatal closure in a dose-and time-dependent manner in epidermal peels of Vicia faba. Using pharmacological methods in this work, we found that the Chlorella-induced stomatal closure was almost completely abolished by a hydrogen peroxide (H2O2) scavenger, catalase (CAT), significantly suppressed by an NADPH oxidase inhibitor, diphenylene iodonium chloride (DPI), and slightly affected by a peroxidase inhibitor, salicylhydroxamic acid (SHAM), suggesting that ROS production involved in Chlorella-induced stomatal closure is mainly mediated by DPI-sensitive NADPH oxidase. Additionally, Exogenous application of optimal concentrations of Chlorella suspension improved instantaneous water use efficiency (WUEi) in Vicia faba via a reduction in leaf transpiration rate (E) without a parallel reduction in net photosynthetic rate (Pn) assessed by gas-exchange measurements. The chlorophyll fluorescence and content analysis further demonstrated that short-term use of Chlorella did not influence plant photosynthetic reactions center. These results preliminarily reveal that Chlorella can trigger stomatal closure via NADPH oxidase-dependent ROS production in epidermal strips and improve WUEi in leave levels.

  2. Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, David M.; Edge, Helen

    2013-07-01

    The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determinationmore » from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)« less

  3. Understanding the school community's response to school closures during the H1N1 2009 influenza pandemic.

    PubMed

    Braunack-Mayer, Annette; Tooher, Rebecca; Collins, Joanne E; Street, Jackie M; Marshall, Helen

    2013-04-15

    During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities' understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Drawing on Thompson et al's ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic.

  4. Rationale and design of a randomised clinical trial comparing vascular closure device and manual compression to achieve haemostasis after diagnostic coronary angiography: the Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial.

    PubMed

    Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan

    2014-06-01

    Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.

  5. DEVELOPMENT OF NEAR-SHORE HYDRODYNAMIC MODELS FOR BEACH CLOSURE FORECASTING IN THE GREAT LAKES

    EPA Science Inventory

    Water quality managers and other planning and decision entities are increasingly calling for up-to-the-minute data on present water quality conditions or forecasts of these data that can be used to adjust or respond to quickly developing activities with environmental implications...

  6. Development Activities on Airbreathing Combined Cycle Engines

    NASA Technical Reports Server (NTRS)

    McArthur, J. Craig; Lyles, Garry (Technical Monitor)

    2000-01-01

    Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.

  7. The Psychology of a Crisis: An Opportunity To Learn.

    ERIC Educational Resources Information Center

    Whiting, Peggy P.

    1998-01-01

    Crisis events may be viewed as expected, sudden, or catastrophic. Survivors have common needs: recognition of loss, soothing of fear, a sense of what happened, expression of feelings, assistance with adjustment, shared closure rituals, and ways to remember. Schools' crisis-response plans should include intervention and postintervention activities…

  8. 7 CFR 225.14 - Requirements for sponsor participation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...

  9. 7 CFR 225.14 - Requirements for sponsor participation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... an unanticipated school closure during the period from October through April (or at any time of the..., from submitting a new application if they have participated in the program at any time during the... and have the capability and the facilities to provide the meal service planned for the number of...

  10. 42 CFR 488.303 - State plan requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... recognition, incentive payments, or both, nursing facilities that provide the highest quality care to Medicaid...) Transfer of residents. (5) Closure of the facility and transfer of residents. (6) State monitoring. (e... remedies that are in addition to those specified in paragraph (d) or (e) of this section, or alternative to...

  11. Turbulence, Perturbance, and Educational Change

    ERIC Educational Resources Information Center

    Beabout, Brian R.

    2012-01-01

    While scholarship on educational change has long accepted that disruptions to the status quo are an essential part of the change process, disruption has never been more central to planned change than it is in the current political context in the USA, where legislation has mandated school closure, reconstitution, and turnaround as required remedies…

  12. How to Perform Transcaval Access and Closure for Transcatheter Aortic Valve Implantation

    PubMed Central

    Lederman, Robert J.; Babaliaros, Vasilis C.; Greenbaum, Adam B.

    2016-01-01

    Transcaval, or caval-aortic, access is a promising approach for fully percutaneous trans-catheter aortic valve implantation in patients without good conventional access options. This tutorial review provides step-by-step guidance to planning and executing the procedure, along with approaches to remedy complications. PMID:26356244

  13. America’s Army: The Strength of the Nation, Strategic Plan, 2009-2015

    DTIC Science & Technology

    2008-11-02

    Realignment and Closure (BRAC) law of 2005 and several complex endeavors like the Grow-the-Army (GTA) and Global Defense Posture Realignment ( GDPR ...2.2.1 Oversee execution of MILCON to support Army stationing (AMF, BRAC, GDPR , and Army Growth) initiatives and timelines

  14. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...

  15. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...

  16. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...

  17. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...

  18. 50 CFR 600.815 - Contents of Fishery Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... stage. (2) Level 2: Habitat-related densities of the species are available. At this level, quantitative... activities. Additionally, the evaluation should consider the establishment of research closure areas or other... the habitat type. (iv) The rarity of the habitat type. (9) Research and information needs. Each FMP...

  19. Economic Blues

    ERIC Educational Resources Information Center

    Stuart, Reginald

    2009-01-01

    Today, a national economy gone bust has derailed Black Americans' plans across the country. Gone are many of the economic gains, small as they were, achieved in the post-segregation era by millions of 1960s generation children and their children. Black America today is beset by job losses, business closures, pay cuts, furloughs, investment and…

  20. Ambiguity and uncertainty tolerance, need for cognition, and their association with stress. A study among Italian practicing physicians

    PubMed Central

    Iannello, Paola; Mottini, Anna; Tirelli, Simone; Riva, Silvia; Antonietti, Alessandro

    2017-01-01

    ABSTRACT Medical practice is inherently ambiguous and uncertain. The physicians’ ability to tolerate ambiguity and uncertainty has been proved to have a great impact on clinical practice. The primary aim of the present study was to test the hypothesis that higher degree of physicians’ ambiguity and uncertainty intolerance and higher need for cognitive closure will predict higher work stress. Two hundred and twelve physicians (mean age = 42.94 years; SD = 10.72) from different medical specialties with different levels of expertise were administered a set of questionnaires measuring perceived levels of work-related stress, individual ability to tolerate ambiguity, stress deriving from uncertainty, and personal need for cognitive closure. A linear regression analysis was performed to examine which variables predict the perceived level of stress. The regression model was statistically significant [R2 = .32; F(10,206) = 8.78, p ≤ .001], thus showing that, after controlling for gender and medical specialty, ambiguity and uncertainty tolerance, decisiveness (a dimension included in need for closure), and the years of practice were significant predictors of perceived work-related stress. Findings from the present study have some implications for medical education. Given the great impact that the individual ability to tolerate ambiguity and uncertainty has on the physicians’ level of perceived work-related stress, it would be worth paying particular attention to such a skill in medical education settings. It would be crucial to introduce or to empower educational tools and strategies that could increase medical students’ ability to tolerate ambiguity and uncertainty. Abbreviations: JSQ: Job stress questionnaire; NFCS: Need for cognitive closure scale; PRU: Physicians’ reactions to uncertainty; TFA: Tolerance for ambiguity PMID:28178917

  1. Ambiguity and uncertainty tolerance, need for cognition, and their association with stress. A study among Italian practicing physicians.

    PubMed

    Iannello, Paola; Mottini, Anna; Tirelli, Simone; Riva, Silvia; Antonietti, Alessandro

    2017-01-01

    Medical practice is inherently ambiguous and uncertain. The physicians' ability to tolerate ambiguity and uncertainty has been proved to have a great impact on clinical practice. The primary aim of the present study was to test the hypothesis that higher degree of physicians' ambiguity and uncertainty intolerance and higher need for cognitive closure will predict higher work stress. Two hundred and twelve physicians (mean age = 42.94 years; SD = 10.72) from different medical specialties with different levels of expertise were administered a set of questionnaires measuring perceived levels of work-related stress, individual ability to tolerate ambiguity, stress deriving from uncertainty, and personal need for cognitive closure. A linear regression analysis was performed to examine which variables predict the perceived level of stress. The regression model was statistically significant [R 2  = .32; F(10,206) = 8.78, p ≤ .001], thus showing that, after controlling for gender and medical specialty, ambiguity and uncertainty tolerance, decisiveness (a dimension included in need for closure), and the years of practice were significant predictors of perceived work-related stress. Findings from the present study have some implications for medical education. Given the great impact that the individual ability to tolerate ambiguity and uncertainty has on the physicians' level of perceived work-related stress, it would be worth paying particular attention to such a skill in medical education settings. It would be crucial to introduce or to empower educational tools and strategies that could increase medical students' ability to tolerate ambiguity and uncertainty. JSQ: Job stress questionnaire; NFCS: Need for cognitive closure scale; PRU: Physicians' reactions to uncertainty; TFA: Tolerance for ambiguity.

  2. Cost-benefit analysis of sequential warning lights in nighttime work zone tapers.

    DOT National Transportation Integrated Search

    2011-06-01

    Improving safety at nighttime work zones is important because of the extra visibility concerns. The deployment of sequential lights is an innovative method for improving driver recognition of lane closures and work zone tapers. Sequential lights are ...

  3. Occupancy estimation and the closure assumption

    USGS Publications Warehouse

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing the closure assumption in both sampling designs and analysis. Furthermore, inappropriately applying closed models could have negative consequences when monitoring rare or declining species for conservation and management decisions, because violations of closure typically lead to overestimates of the probability of occurrence.

  4. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  5. Parallel closure theory for toroidally confined plasmas

    NASA Astrophysics Data System (ADS)

    Ji, Jeong-Young; Held, Eric D.

    2017-10-01

    We solve a system of general moment equations to obtain parallel closures for electrons and ions in an axisymmetric toroidal magnetic field. Magnetic field gradient terms are kept and treated using the Fourier series method. Assuming lowest order density (pressure) and temperature to be flux labels, the parallel heat flow, friction, and viscosity are expressed in terms of radial gradients of the lowest-order temperature and pressure, parallel gradients of temperature and parallel flow, and the relative electron-ion parallel flow velocity. Convergence of closure quantities is demonstrated as the number of moments and Fourier modes are increased. Properties of the moment equations in the collisionless limit are also discussed. Combining closures with fluid equations parallel mass flow and electric current are also obtained. Work in collaboration with the PSI Center and supported by the U.S. DOE under Grant Nos. DE-SC0014033, DE-SC0016256, and DE-FG02-04ER54746.

  6. Experiments and Simulations of Fully Hydro-Mechanically Coupled Response of Rough Fractures Exposed to High-Pressure Fluid Injection

    NASA Astrophysics Data System (ADS)

    Vogler, D.; Settgast, R. R.; Annavarapu, C.; Madonna, C.; Bayer, P.; Amann, F.

    2018-02-01

    In this work, we present the application of a fully coupled hydro-mechanical method to investigate the effect of fracture heterogeneity on fluid flow through fractures at the laboratory scale. Experimental and numerical studies of fracture closure behavior in the presence of heterogeneous mechanical and hydraulic properties are presented. We compare the results of two sets of laboratory experiments on granodiorite specimens against numerical simulations in order to investigate the mechanical fracture closure and the hydro-mechanical effects, respectively. The model captures fracture closure behavior and predicts a nonlinear increase in fluid injection pressure with loading. Results from this study indicate that the heterogeneous aperture distributions measured for experiment specimens can be used as model input for a local cubic law model in a heterogeneous fracture to capture fracture closure behavior and corresponding fluid pressure response.

  7. Integration of actomyosin contractility with cell-cell adhesion during dorsal closure.

    PubMed

    Duque, Julia; Gorfinkiel, Nicole

    2016-12-15

    In this work, we combine genetic perturbation, time-lapse imaging and quantitative image analysis to investigate how pulsatile actomyosin contractility drives cell oscillations, apical cell contraction and tissue closure during morphogenesis of the amnioserosa, the main force-generating tissue during the dorsal closure in Drosophila We show that Myosin activity determines the oscillatory and contractile behaviour of amnioserosa cells. Reducing Myosin activity prevents cell shape oscillations and reduces cell contractility. By contrast, increasing Myosin activity increases the amplitude of cell shape oscillations and the time cells spend in the contracted phase relative to the expanded phase during an oscillatory cycle, promoting cell contractility and tissue closure. Furthermore, we show that in AS cells, Rok controls Myosin foci formation and Mbs regulates not only Myosin phosphorylation but also adhesion dynamics through control of Moesin phosphorylation, showing that Mbs coordinates actomyosin contractility with cell-cell adhesion during amnioserosa morphogenesis. © 2016. Published by The Company of Biologists Ltd.

  8. Second-order closure models for supersonic turbulent flows

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.; Sarkar, Sutanu

    1991-01-01

    Recent work by the authors on the development of a second-order closure model for high-speed compressible flows is reviewed. This turbulence closure is based on the solution of modeled transport equations for the Favre-averaged Reynolds stress tensor and the solenoidal part of the turbulent dissipation rate. A new model for the compressible dissipation is used along with traditional gradient transport models for the Reynolds heat flux and mass flux terms. Consistent with simple asymptotic analyses, the deviatoric part of the remaining higher-order correlations in the Reynolds stress transport equation are modeled by a variable density extension of the newest incompressible models. The resulting second-order closure model is tested in a variety of compressible turbulent flows which include the decay of isotropic turbulence, homogeneous shear flow, the supersonic mixing layer, and the supersonic flat-plate turbulent boundary layer. Comparisons between the model predictions and the results of physical and numerical experiments are quite encouraging.

  9. Second-order closure models for supersonic turbulent flows

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.; Sarkar, Sutanu

    1991-01-01

    Recent work on the development of a second-order closure model for high-speed compressible flows is reviewed. This turbulent closure is based on the solution of modeled transport equations for the Favre-averaged Reynolds stress tensor and the solenoidal part of the turbulent dissipation rate. A new model for the compressible dissipation is used along with traditional gradient transport models for the Reynolds heat flux and mass flux terms. Consistent with simple asymptotic analyses, the deviatoric part of the remaining higher-order correlations in the Reynolds stress transport equations are modeled by a variable density extension of the newest incompressible models. The resulting second-order closure model is tested in a variety of compressible turbulent flows which include the decay of isotropic turbulence, homogeneous shear flow, the supersonic mixing layer, and the supersonic flat-plate turbulent boundary layer. Comparisons between the model predictions and the results of physical and numerical experiments are quite encouraging.

  10. 488-1D Ash Basin closure cap help modeling- Microdrain® liner option

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, J. A.

    At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—60-mil low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic head formore » the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.15 inches for a minimum slope equal to 3%, which is two orders of magnitude below the SCDHEC upper limit of 12 inches.« less

  11. 488-1D Ash basin closure cap help modeling-Microdrain® liner option

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, J.

    At the request of Area Completion Engineering and in support of the 488-1D Ash Basin closure, the Savannah River National Laboratory (SRNL) performed hydrologic simulations of the revised 488-1D Ash Basin closure cap design using the Hydrologic Evaluation of Landfill Performance (HELP) model. The revised design substitutes a MicroDrain Liner®—50-mil linear low-density polyethylene geomembrane structurally integrated with 130-mil drainage layer—for the previously planned drainage/barrier system—300-mil geosynthetic drainage layer (GDL), 300-mil geosynthetic clay liner (GCL), and 6-inch common fill soil layer. For a 25-year, 24-hour storm event, HELP model v3.07 was employed to (1) predict the peak maximum daily hydraulic headmore » for the geomembrane layer, and (2) ensure that South Carolina Department of Health and Environmental Control (SCDHEC) requirements for the barrier layer (i.e., ≤ 12 inches hydraulic head on top of a barrier having a saturated hydraulic conductivity ≤ 1.0E-05 cm/s) will not be exceeded. A 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches rainfall (Weber 1998). HELP model v3.07 results based upon the new planned cap design suggest that the peak maximum daily hydraulic head on the geomembrane barrier layer will be 0.179 inches for a minimum slope equal to 3%, which is approximately two orders of magnitude below the SCDHEC upper limit of 12 inches.« less

  12. Modeling variable density turbulence in the wake of an air-entraining transom stern

    NASA Astrophysics Data System (ADS)

    Hendrickson, Kelli; Yue, Dick

    2015-11-01

    This work presents a priori testing of closure models for the incompressible highly-variable density turbulent (IHVDT) flows in the near wake region of a transom stern. This three-dimensional flow is comprised of convergent corner waves that originate from the body and collide on the ship center plane forming the ``rooster tail'' that then widens to form the divergent wave train. These violent free-surface flows and breaking waves are characterized by significant turbulent mass flux (TMF) at Atwood number At = (ρ2 -ρ1) / (ρ2 +ρ1) ~ 1 for which there is little guidance in turbulence closure modeling for the momentum and scalar transport along the wake. To whit, this work utilizes high-resolution simulations of the near wake of a canonical three-dimensional transom stern using conservative Volume-of-Fluid (cVOF), implicit Large Eddy Simulation (iLES), and Boundary Data Immersion Method (BDIM) to capture the turbulence and large scale air entrainment. Analysis of the simulation results across and along the wake for the TMF budget and turbulent anisotropy provide the physical basis of the development of multiphase turbulence closure models. Performance of isotropic and anisotropic turbulent mass flux closure models will be presented. Sponsored by the Office of Naval Research.

  13. Personalized mitral valve closure computation and uncertainty analysis from 3D echocardiography.

    PubMed

    Grbic, Sasa; Easley, Thomas F; Mansi, Tommaso; Bloodworth, Charles H; Pierce, Eric L; Voigt, Ingmar; Neumann, Dominik; Krebs, Julian; Yuh, David D; Jensen, Morten O; Comaniciu, Dorin; Yoganathan, Ajit P

    2017-01-01

    Intervention planning is essential for successful Mitral Valve (MV) repair procedures. Finite-element models (FEM) of the MV could be used to achieve this goal, but the translation to the clinical domain is challenging. Many input parameters for the FEM models, such as tissue properties, are not known. In addition, only simplified MV geometry models can be extracted from non-invasive modalities such as echocardiography imaging, lacking major anatomical details such as the complex chordae topology. A traditional approach for FEM computation is to use a simplified model (also known as parachute model) of the chordae topology, which connects the papillary muscle tips to the free-edges and select basal points. Building on the existing parachute model a new and comprehensive MV model was developed that utilizes a novel chordae representation capable of approximating regional connectivity. In addition, a fully automated personalization approach was developed for the chordae rest length, removing the need for tedious manual parameter selection. Based on the MV model extracted during mid-diastole (open MV) the MV geometric configuration at peak systole (closed MV) was computed according to the FEM model. In this work the focus was placed on validating MV closure computation. The method is evaluated on ten in vitro ovine cases, where in addition to echocardiography imaging, high-resolution μCT imaging is available for accurate validation. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  15. Device closure of secundum atrial septal defect's and the risk of cardiac erosion.

    PubMed

    Thomson, J D R; Qureshi, S A

    2015-12-01

    Cardiac erosion related to transcatheter atrial septal defect closure devices is of increasing concern. Erosion is reported to have occurred with most of currently available occluder devices. Perhaps due to the very large number of implants worldwide, the Amplatzer (St Jude) occluder is associated with the majority of cardiac erosion events reported in the literature. Best current estimates of the incidence of erosion with the St Jude device are between one and three cases per 1000 implants. Most events occur early after implantation and it is rare, although not unheard of, for events to occur after a year following device insertion. It is important that those involved with closure programmes are vigilant for the problem, because device-related erosion is associated with a significant mortality risk. Despite considerable debate, the risk factors (either patient or device) for erosion remain unclear and require further investigation. Currently available data sets have focussed largely on erosion cohorts and are unable to place these cases in appropriate context with non-erosion closure cases. What is certain is that programmes implanting these devices must take care to implant appropriately sized devices and have in place plans to ensure that patients are both well informed and can access help and advice in the event of developing symptoms.

  16. Transcatheter closure of a small atrial septal defect with an Amplatzer™ patent foramen ovale occluder in a working dog with cyanosis and exercise intolerance at high altitude.

    PubMed

    Shelden, A; Wesselowski, S; Gordon, S G; Saunders, A B

    2017-12-01

    A 6.5-year-old male Border Collie presented for transcatheter closure of an atrial septal defect due to exercise intolerance and cyanosis while working and training at altitude. A small, left-to-right shunting secundum atrial septal defect was confirmed with no evidence of significant right-sided volume overload. Pulmonary hypertension with subsequent right-to-left interatrial shunting occurring during exercise at high altitude was suspected and prompted the closure of the defect due to the dog's continued athletic requirements. The anatomy of the defect prompted use of a patent foramen ovale occluder rather than an atrial septal defect occluder, which was deployed using a combination of fluoroscopic and transesophageal echocardiographic guidance. The owner did not report continued exercise intolerance or cyanosis and the dog's lifestyle and residence at altitude was unchanged. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Capacity and road user cost analysis of selected freeway work zones in Texas.

    DOT National Transportation Integrated Search

    2009-09-01

    This research was developed to produce usable and meaningful estimates for work zone capacities under a variety of roadway and traffic conditions, work zone configurations, and lane closure scenarios within Texas. Using data collected at eighteen wor...

  18. Closure Report for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-09-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  19. Automated and Adaptive Mission Planning for Orbital Express

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel; Koblick, Darin

    2008-01-01

    The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

  20. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less

  1. TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste andmore » heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast furnace slag (7.52 wt. %) and water (24.81 wt. %); (2) Identify equipment grout placement and performance properties; (3) Design up to 2 additional grout systems for filling the Tank 18-F and Tank 19-F equipment; (4) Prepare samples of candidate grouts and measure fresh properties, thermal properties and cured properties; (5) Recommend a grout for the Tier 1A equipment fill mock up - ADMP 4 foot high mock up, 1 inch and 2 inch pipes; (6) Support procurement of materials for the Tier 1A equipment fill mock up test; (7) Prepare samples of the recommended grout for hydraulic property measurements which can be used for comparison to values used in the F- Tank Farm Performance Assessment (PA); and (8) Document equipment fill grout data and recommendations in a report.« less

  2. Revisiting global mean sea level budget closure : Preliminary results from an integrative study within ESA's Climate Change Initiative -Sea level Budget Closure-Climate Change Initiative

    NASA Astrophysics Data System (ADS)

    Palanisamy, H.; Cazenave, A. A.

    2017-12-01

    The global mean sea level budget is revisited over two time periods: the entire altimetry era, 1993-2015 and the Argo/GRACE era, 2003-2015 using the version '0' of sea level components estimated by the SLBC-CCI teams. The SLBC-CCI is an European Space Agency's project on sea level budget closure using CCI products. Over the entire altimetry era, the sea level budget was performed as the sum of steric and mass components that include contributions from total land water storage, glaciers, ice sheets (Greenland and Antarctica) and total water vapor content. Over the Argo/GRACE era, it was performed as the sum of steric and GRACE based ocean mass. Preliminary budget analysis performed over the altimetry era (1993-2015) results in a trend value of 2.83 mm/yr. On comparison with the observed altimetry-based global mean sea level trend over the same period (3.03 ± 0.5 mm/yr), we obtain a residual of 0.2 mm/yr. In spite of a residual of 0.2 mm/yr, the sea level budget result obtained over the altimetry era is very promising as this has been performed using the version '0' of the sea level components. Furthermore, uncertainties are not yet included in this study as uncertainty estimation for each sea level component is currently underway. Over the Argo/GRACE era (2003-2015), the trend estimated from the sum of steric and GRACE ocean mass amounts to 2.63 mm/yr while that observed by satellite altimetry is 3.37 mm/yr, thereby leaving a residual of 0.7 mm/yr. Here an ensemble GRACE ocean mass data (mean of various available GRACE ocean mass data) was used for the estimation. Using individual GRACE data results in a residual range of 0.5 mm/yr -1.1 mm/yr. Investigations are under way to determine the cause of the vast difference between the observed sea level and the sea level obtained from steric and GRACE ocean mass. One main suspect is the impact of GRACE data gaps on sea level budget analysis due to lack of GRACE data over several months since 2011. The current action plan of the project is to work on an accurate closure of the sea level budget using both the above performed methodologies. We also intend to provide a standardized uncertainty estimation and to correctly identify the causes leading to sea level budget non-closure if that is the case.

  3. Don't Trust a Management Metric, Especially in Life Support

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2014-01-01

    Goodhart's law states that metrics do not work. Metrics become distorted when used and they deflect effort away from more important goals. These well-known and unavoidable problems occurred when the closure and system mass metrics were used to manage life support research. The intent of life support research should be to develop flyable, operable, reliable systems, not merely to increase life support system closure or to reduce its total mass. It would be better to design life support systems to meet the anticipated mission requirements and user needs. Substituting the metrics of closure and total mass for these goals seems to have led life support research to solve the wrong problems.

  4. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2013 and FY2014 (revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Miller, Julianne J.; McCurdy, Greg D.

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff, which supports National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closure designmore » and post-closure monitoring program.« less

  5. 75 FR 51942 - Drawbridge Operation Regulation; Atchafalaya River, Melville, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    .... The deviation is necessary to perform asbestos abatement work to the draw tender's house. This..., October 9, 2010. The closure is necessary in order to conduct asbestos abatement work on the draw tender's...

  6. Cyanoacrylate closure of incompetent great, small and accessory saphenous veins without the use of post-procedure compression: Initial outcomes of a post-market evaluation of the VenaSeal System (the WAVES Study).

    PubMed

    Gibson, Kathleen; Ferris, Brian

    2017-04-01

    Purpose Cyanoacrylate closure of the great saphenous vein with the VenaSeal™ Closure System is a relatively new modality. Studies have been limited to moderate-sized great saphenous veins and some have mandated postoperative compression stockings. We report the results of a prospective study of cyanoacrylate closure for the treatment of great saphenous vein, small saphenous veins, and/or accessory saphenous veins up to 20 mm in diameter. Methods Fifty subjects with symptomatic great saphenous vein, small saphenous veins, and/or accessory saphenous veins incompetence were each treated at a single session. Compression stockings were not used post-procedure. Subjects returned to clinic at week 1 and again at one month. Post-procedure evaluations were performed at seven days and one month and included numerical pain rating score, revised venous clinical severity score, the Aberdeen Varicose Vein Questionnaire score, and time to return to work and normal activities. Duplex ultrasound was performed at each visit. Findings Procedural pain was mild (numerical pain rating scale 2.2 ± 1.8). All treated veins (48 great saphenous vein, 14 accessory saphenous veins, and 8 small saphenous veins) had complete closure by duplex ultrasound at seven days and one month. Mean time to return to work and normal activities was 0.2 ± 1.1 and 2.4 ± 4.1 days, respectively. The revised venous clinical severity score was improved to 1.8 ± 1.4 ( p < .001) and Aberdeen Varicose Vein Questionnaire score to 8.9 ± 6.6 ( p < .001) at one month. Phlebitis in the treatment area or side branches occurred in 10 subjects (20%) and completely resolved in all but one subject (2%) by one month; 98% of subjects were "completely" or "somewhat" satisfied, and 2% "unsatisfied" with the procedure at one month, despite the protocol disallowance of concomitant side branch treatment. Conclusions Cyanoacrylate closure is safe and effective for the treatment of one or more incompetent saphenous or accessory saphenous veins. Closure rates were high even in the absence of the use of compression stockings or side branch treatment. Time back to work or normal activities was short and improvements in venous severity scores and QOL were significant, comparing favorably with alternative treatment methods.

  7. Developing a Strategic Plan for Transitioning to Healthcare Knowledge Services Centers (HKSCs)

    PubMed Central

    Goldstein, H. Mark; Coletti, Margaret H.

    2012-01-01

    Facing a negative trend in the form of downsizing, layoffs, and closures, a small committee of hospital librarians in New England was formed in 2004 to provide library advocacy. Between 2008 and 2010, 23 hospital libraries closed in New England. In 2010, the committee shifted its focus from advocacy to a platform for change. This resulted in the creation of the Healthcare Knowledge Services Center (HKSC) Template. The Template is the basis for a 3-phased, 5-year strategic plan to establish several regional pilots, transitioning traditional hospital libraries to healthcare knowledge services centers. This article focuses on Phase One of the strategic plan, Development. PMID:23125551

  8. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  9. Stress-induced, time-dependent fracture closure at hydrothermal conditions

    USGS Publications Warehouse

    Beeler, N.M.; Hickman, S.H.

    2004-01-01

    Time-dependent closure of fractures in quartz was measured in situ at 22-530??C temperature and 0.1-150 MPa water pressure. Unlike previous crack healing and rock permeability studies, in this study, fracture aperture is monitored directly and continuously using a windowed pressure vessel, a long-working-distance microscope, and reflected-light interferometry. Thus the fracture volume and geometry can be measured as a function of time, temperature, and water pressure. Relatively uniform closure occurs rapidly at temperatures and pressures where quartz becomes significantly soluble in water. During closure the aperture is reduced by as much as 80% in a few hours. We infer that this closure results from the dissolution of small particles or asperities that prop the fracture open. The driving force for closure via dissolution of the prop is the sum of three chemical potential terms: (1) the dissolution potential, proportional to the logarithm of the degree of undersaturation of the solution; (2) the coarsening potential, proportional to the radius of curvature of the prop; and (3) the pressure solution potential, proportional to the effective normal stress at the contact between propping particles and the fracture wall. Our observations suggest that closure is controlled by a pressure solution-like process. The aperture of dilatant fractures and microcracks in the Earth that are similar to those in our experiments, such as ones generated from thermal stressing or brittle failure during earthquake rupture and slip, will decrease rapidly with time, especially if the macroscopic stress is nonhydrostatic.

  10. Stress-induced, time-dependent fracture closure at hydrothermal conditions

    NASA Astrophysics Data System (ADS)

    Beeler, N. M.; Hickman, S. H.

    2004-02-01

    Time-dependent closure of fractures in quartz was measured in situ at 22-530°C temperature and 0.1-150 MPa water pressure. Unlike previous crack healing and rock permeability studies, in this study, fracture aperture is monitored directly and continuously using a windowed pressure vessel, a long-working-distance microscope, and reflected-light interferometry. Thus the fracture volume and geometry can be measured as a function of time, temperature, and water pressure. Relatively uniform closure occurs rapidly at temperatures and pressures where quartz becomes significantly soluble in water. During closure the aperture is reduced by as much as 80% in a few hours. We infer that this closure results from the dissolution of small particles or asperities that prop the fracture open. The driving force for closure via dissolution of the prop is the sum of three chemical potential terms: (1) the dissolution potential, proportional to the logarithm of the degree of undersaturation of the solution; (2) the coarsening potential, proportional to the radius of curvature of the prop; and (3) the pressure solution potential, proportional to the effective normal stress at the contact between propping particles and the fracture wall. Our observations suggest that closure is controlled by a pressure solution-like process. The aperture of dilatant fractures and microcracks in the Earth that are similar to those in our experiments, such as ones generated from thermal stressing or brittle failure during earthquake rupture and slip, will decrease rapidly with time, especially if the macroscopic stress is nonhydrostatic.

  11. Decision sidestepping: How the motivation for closure prompts individuals to bypass decision making.

    PubMed

    Otto, Ashley S; Clarkson, Joshua J; Kardes, Frank R

    2016-07-01

    We all too often have to make decisions-from the mundane (e.g., what to eat for breakfast) to the complex (e.g., what to buy a loved one)-and yet there exists a multitude of strategies that allows us to make a decision. This work focuses on a subset of decision strategies that allows individuals to make decisions by bypassing the decision-making process-a phenomenon we term decision sidestepping. Critical to the present manuscript, however, we contend that decision sidestepping stems from the motivation to achieve closure. We link this proposition back to the fundamental nature of closure and how those seeking closure are highly bothered by decision making. As such, we argue that the motivation to achieve closure prompts a reliance on sidestepping strategies (e.g., default bias, choice delegation, status quo bias, inaction inertia, option fixation) to reduce the bothersome nature of decision making. In support of this framework, five experiments demonstrate that (a) those seeking closure are more likely to engage in decision sidestepping, (b) the effect of closure on sidestepping stems from the bothersome nature of decision making, and (c) the reliance on sidestepping results in downstream consequences for subsequent choice. Taken together, these findings offer unique insight into the cognitive motivations stimulating a reliance on decision sidestepping and thus a novel framework by which to understand how individuals make decisions while bypassing the decision-making process. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  12. 77 FR 58313 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ..., closures and coils, from graphic arts operations, from the provision of sampling and testing facilities... Provision of Sampling and Revised 03/21/01....... 05/31/01 Testing Facilities. AVAQMD 1168 Adhesive and... District (1) Rule 205, ``Provision of Sampling and Testing Facilities,'' revised on March 21, 2001...

  13. Phoenix's roadway closure and restriction system : lessons learned from the Metropolitan Model Deployment Initiative : providing enhanced traffic information to the public

    DOT National Transportation Integrated Search

    1998-01-01

    The purpose of the ITS Planning Handbook is to provide a tool to assist in meeting current challenges. Specifically, the purposes of the Handbook are to: (1) Identify and describe ways that ITS should be integrated with the mainstream transportation ...

  14. 76 FR 38997 - Approval and Promulgation of Implementation Plans; State of Oregon; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... economic blow that would result from an earlier closure and is an appropriate balance of environmental and... BART rules for the Boardman facility achieve the proper balance of environmental benefits, the cost to... secure greater environmental benefits with a better balance of cost and risk by transitioning the...

  15. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  16. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  17. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  18. 40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...

  19. 43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...

  20. 43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...

  1. Living on a Cotton Farm: Mexican American Life in Texas.

    ERIC Educational Resources Information Center

    Black, Mary S.

    This packet of six lesson plans highlights Mexican-American life on a Texas cotton farm in the early 20th century. Each lesson provides a lesson overview; states educational objectives; cites materials needed; details the procedure for classroom implementation; offers a closure activity; and suggests an extension activity. The packet is divided…

  2. 40 CFR 61.226 - Reconsideration of rescission and reinstatement of this subpart.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Emission Standards for Radon Emissions From the Disposal of Uranium Mill Tailings § 61.226 Reconsideration... by EPA and NRC or the tailings closure plan (radon) (i.e., contained in the license) requirements establishing milestones for the purpose of emplacing a permanent radon barrier that will achieve compliance...

  3. 36 CFR 907.11 - Actions that normally require an environmental assessment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...

  4. 36 CFR 907.11 - Actions that normally require an environmental assessment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Actions that normally require an environmental assessment. 907.11 Section 907.11 Parks, Forests, and Public Property PENNSYLVANIA...) Street closures and other rearrangements of public space which were not covered in the Plan or the Final...

  5. Building a New High School and Forging a New Community.

    ERIC Educational Resources Information Center

    Krajewski, Robert

    1988-01-01

    Two aging structures were replaced by Central High School in an Indiana steel town. Planning, board and administrator support, and community involvement eased negative attitudes toward the high school closures and resulted in a $36 million school that has unified the city and will serve it for over 50 years. (MLF)

  6. Flood-inundation maps for Grand River, Red Cedar River, and Sycamore Creek near Lansing, Michigan

    USGS Publications Warehouse

    Whitehead, Matthew; Ostheimer, Chad J.

    2015-08-26

    These maps, used in conjunction with real-time USGS streamgage data and NWS forecasting, provide critical information to emergency management personnel and the public. This information is used to plan flood response actions, such as evacuations and road closures, as well as aid in postflood recovery efforts.

  7. County of Hawaii Department of Public Works: Consent Agreement and Final Order (2005)

    EPA Pesticide Factsheets

    Consent Agreement and Final Order for The County of Hawaii Department of Public Works, Hilo, Hawaii, including proposed order of compliance, closure of large capacity cesspools. Docket no. UIC-AO-2005-0013

  8. Development of recommendations for arterial lane closures to optimize traffic operations.

    DOT National Transportation Integrated Search

    2013-01-01

    The 2010 FDOT Design Standards provide information regarding traffic control through work zones at multilane arterials. : However, there are currently no quantitative guidelines for optimizing signal control around work zones. The objective of this :...

  9. Purse-string double-layer closure: a novel technique for repairing the uterine incision during cesarean section.

    PubMed

    Turan, Cem; Büyükbayrak, Esra Esim; Yilmaz, Aylin Onan; Karsidag, Yasemin Karageyim; Pirimoglu, Meltem

    2015-04-01

    To compare the classical double-layer uterine closure to a double-layer purse-string uterine closure (Turan technique) in cesarean section regarding short- and long-term results. Patients were randomized into either the double-layer purse-string uterine closure arm (study group, 84 patients) or the classical double-layer uterine closure arm (control group, 84 patients). For short-term comparison, a detailed transvaginal ultrasound examination was planned in all patients 6 weeks after the operation and a wedge-shaped defect in the uterine incision scar was accepted as uterine scar defect and recorded. For the long-term comparison, subsequent pregnancies of these patients were followed up for any complication. The number of patients with ultrasonographically visible uterine scar defect was 12 (23.5% of all scar defects) in the study group whereas it was 39 (76.5% of all scar defects) in the control group (P < 0.001, χ(2) = 15.42). Demographic data, operation time, hospitalization time, preoperative and postoperative hemoglobin values were not significantly different between the groups. During the 2-year of the follow-up period, five patients in the study group and six patients in the control group became pregnant again. No complication during their pregnancies and second cesarean operation were encountered. With the Turan technique, the uterine incision length becomes shorter, and the frequency of uterine scar defect is lower regarding short-term results. More data is needed for long-term results. ClinicalTrials.gov NCT01287611. © 2014 The Authors. Journal of Obstetrics and Gynaecology Research © 2014 Japan Society of Obstetrics and Gynecology.

  10. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  11. Work zone lane closure analysis model.

    DOT National Transportation Integrated Search

    2009-10-01

    At the Alabama Department of Transportation (ALDOT), the tool used by traffic engineers to predict whether a queue will form at a freeway work zone is the Excel-based "Lane Rental Model" developed at the Oklahoma Department of Transportation (OkDOT) ...

  12. Computing moving and intermittent queue propagation in highway work zones.

    DOT National Transportation Integrated Search

    2012-07-01

    Drivers may experience intermittent congestion and moving queue conditions in work zones due to several reasons such as presence of lane closure, roadway geometric changes, higher demand, lower speed, and reduced capacity. The congestion and queue ha...

  13. Dynamic modelling of costs and health consequences of school closure during an influenza pandemic

    PubMed Central

    2012-01-01

    Background The purpose of this article is to evaluate the cost-effectiveness of school closure during a potential influenza pandemic and to examine the trade-off between costs and health benefits for school closure involving different target groups and different closure durations. Methods We developed two models: a dynamic disease model capturing the spread of influenza and an economic model capturing the costs and benefits of school closure. Decisions were based on quality-adjusted life years gained using incremental cost-effectiveness ratios. The disease model is an age-structured SEIR compartmental model based on the population of Oslo. We studied the costs and benefits of school closure by varying the age targets (kindergarten, primary school, secondary school) and closure durations (1–10 weeks), given pandemics with basic reproductive number of 1.5, 2.0 or 2.5. Results The cost-effectiveness of school closure varies depending on the target group, duration and whether indirect costs are considered. Using a case fatality rate (CFR) of 0.1-0.2% and with current cost-effectiveness threshold for Norway, closing secondary school is the only cost-effective strategy, when indirect costs are included. The most cost-effective strategies would be closing secondary schools for 8 weeks if R0=1.5, 6 weeks if R0=2.0, and 4 weeks if R0= 2.5. For severe pandemics with case fatality rates of 1-2%, similar to the Spanish flu, or when indirect costs are disregarded, the optimal strategy is closing kindergarten, primary and secondary school for extended periods of time. For a pandemic with 2009 H1N1 characteristics (mild severity and low transmissibility), closing schools would not be cost-effective, regardless of the age target of school children. Conclusions School closure has moderate impact on the epidemic’s scope, but the resulting disruption to society imposes a potentially great cost in terms of lost productivity from parents’ work absenteeism. PMID:23140513

  14. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less

  15. Modeling of combined effects of divertor closure and advanced magnetic configuration on detachment in DIII-D by SOLPS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Si, Hang; Guo, Houyang Y.; Covele, Brent

    One of the major challenges facing the design and operation of next-step high-power steady-state fusion devices is to develop a divertor solution for handling power exhaust, while ensuring acceptable divertor target plate erosion, which necessitates access to divertor detachment at relative low main plasma densities compatible with current drive and high plasma confinement. Detailed modeling with SOLPS is carried out to examine the effect of divertor closure on detachment with the normal single null divertor (SD) configuration, as well as one of the advanced divertor configurations, such as x-divertor (XD) respectively. The SOLPS modeling for a high confinement plasma in DIII-D finds that increasing divertor closure with SD reduces the upstream separatrix density at the onset of detachment frommore » $$1.18\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$ to $$0.88\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$. Furthermore, coupling the divertor closure with XD further promotes the onset of divertor detachment at a still lower upstream separatrix density, down to the value of $$0.67\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$, thus, showing that divertor closure and advanced magnetic configuration can work synergistically to facilitate divertor detachment.« less

  16. Modeling of combined effects of divertor closure and advanced magnetic configuration on detachment in DIII-D by SOLPS

    DOE PAGES

    Si, Hang; Guo, Houyang Y.; Covele, Brent; ...

    2018-04-04

    One of the major challenges facing the design and operation of next-step high-power steady-state fusion devices is to develop a divertor solution for handling power exhaust, while ensuring acceptable divertor target plate erosion, which necessitates access to divertor detachment at relative low main plasma densities compatible with current drive and high plasma confinement. Detailed modeling with SOLPS is carried out to examine the effect of divertor closure on detachment with the normal single null divertor (SD) configuration, as well as one of the advanced divertor configurations, such as x-divertor (XD) respectively. The SOLPS modeling for a high confinement plasma in DIII-D finds that increasing divertor closure with SD reduces the upstream separatrix density at the onset of detachment frommore » $$1.18\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$ to $$0.88\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$. Furthermore, coupling the divertor closure with XD further promotes the onset of divertor detachment at a still lower upstream separatrix density, down to the value of $$0.67\\times {{10}^{19}}\\,{{{\\rm m}}^{-3}}$$, thus, showing that divertor closure and advanced magnetic configuration can work synergistically to facilitate divertor detachment.« less

  17. Modeling of combined effects of divertor closure and advanced magnetic configuration on detachment in DIII-D by SOLPS

    NASA Astrophysics Data System (ADS)

    Si, H.; Guo, H. Y.; Covele, B.; Leonard, A. W.; Watkins, J. G.; Thomas, D.; Ding, R.

    2018-05-01

    One of the major challenges facing the design and operation of next-step high-power steady-state fusion devices is to develop a divertor solution for handling power exhaust, while ensuring acceptable divertor target plate erosion, which necessitates access to divertor detachment at relative low main plasma densities compatible with current drive and high plasma confinement. Detailed modeling with SOLPS is carried out to examine the effect of divertor closure on detachment with the normal single null divertor (SD) configuration, as well as one of the advanced divertor configurations, such as x-divertor (XD) respectively. The SOLPS modeling for a high confinement plasma in DIII-D finds that increasing divertor closure with SD reduces the upstream separatrix density at the onset of detachment from 1.18× {{10}19} {{m}-3} to 0.88× {{10}19} {{m}-3} . Moreover, coupling the divertor closure with XD further promotes the onset of divertor detachment at a still lower upstream separatrix density, down to the value of 0.67× {{10}19} {{m}-3} , thus, showing that divertor closure and advanced magnetic configuration can work synergistically to facilitate divertor detachment.

  18. The Synthesis of Force Closure Grasps in the Plane.

    DTIC Science & Technology

    1985-09-01

    TASK U Artificial Inteligence Laboratory AREA A WORK UN IT "NMUIERS ~( 545 Technology Square Cambridge, MA 02139 SI. CONTROLLING OFICE NAME ANO... ARTIFICIAL INThLLIX’ ENCE LABORATORY A. 1. Memo 861 September, 1985 The Synthesis of Force-Closure Grasps In the Plane DTIC ’VeL% ,#ECTE 1 VnDcNguyenU Abstract... Artificial In- telligenmcc Liabomatory of thle Massachuset Is hInsttute of Teclhnolog3 . Support for the Lahoratot * s Artificial Intelligence research is

  19. Closure of the R Reactor Disassembly Basin at the SRS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W.E.

    The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less

  20. 488-4D ASH LANDFILL CLOSURE CAP HELP MODELING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phifer, M.

    At the request of Area Completion Projects (ACP) in support of the 488-4D Landfill closure, the Savannah River National Laboratory (SRNL) has performed Hydrologic Evaluation of Landfill Performance (HELP) modeling of the planned 488-4D Ash Landfill closure cap to ensure that the South Carolina Department of Health and Environmental Control (SCDHEC) limit of no more than 12 inches of head on top of the barrier layer (saturated hydraulic conductivity of no more than 1.0E-05 cm/s) in association with a 25-year, 24-hour storm event is not projected to be exceeded. Based upon Weber 1998 a 25-year, 24-hour storm event at themore » Savannah River Site (SRS) is 6.1 inches. The results of the HELP modeling indicate that the greatest peak daily head on top of the barrier layer (i.e. geosynthetic clay liner (GCL) or high density polyethylene (HDPE) geomembrane) for any of the runs made was 0.079 inches associated with a peak daily precipitation of 6.16 inches. This is well below the SCDHEC limit of 12 inches.« less

  1. Criticality assessment of LLRWDF closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarrack, A.G.; Weber, J.H.; Woody, N.D.

    1992-10-06

    During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of themore » LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted.« less

  2. Closure development for high-level nuclear waste containers for the tuff repository; Phase 1, Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P.

    1990-09-01

    This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literaturemore » survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.« less

  3. Uncertainty Quantification of Turbulence Model Closure Coefficients for Transonic Wall-Bounded Flows

    NASA Technical Reports Server (NTRS)

    Schaefer, John; West, Thomas; Hosder, Serhat; Rumsey, Christopher; Carlson, Jan-Renee; Kleb, William

    2015-01-01

    The goal of this work was to quantify the uncertainty and sensitivity of commonly used turbulence models in Reynolds-Averaged Navier-Stokes codes due to uncertainty in the values of closure coefficients for transonic, wall-bounded flows and to rank the contribution of each coefficient to uncertainty in various output flow quantities of interest. Specifically, uncertainty quantification of turbulence model closure coefficients was performed for transonic flow over an axisymmetric bump at zero degrees angle of attack and the RAE 2822 transonic airfoil at a lift coefficient of 0.744. Three turbulence models were considered: the Spalart-Allmaras Model, Wilcox (2006) k-w Model, and the Menter Shear-Stress Trans- port Model. The FUN3D code developed by NASA Langley Research Center was used as the flow solver. The uncertainty quantification analysis employed stochastic expansions based on non-intrusive polynomial chaos as an efficient means of uncertainty propagation. Several integrated and point-quantities are considered as uncertain outputs for both CFD problems. All closure coefficients were treated as epistemic uncertain variables represented with intervals. Sobol indices were used to rank the relative contributions of each closure coefficient to the total uncertainty in the output quantities of interest. This study identified a number of closure coefficients for each turbulence model for which more information will reduce the amount of uncertainty in the output significantly for transonic, wall-bounded flows.

  4. Correction of MFG-E8 Resolves Inflammation and Promotes Cutaneous Wound Healing in Diabetes.

    PubMed

    Das, Amitava; Ghatak, Subhadip; Sinha, Mithun; Chaffee, Scott; Ahmed, Noha S; Parinandi, Narasimham L; Wohleb, Eric S; Sheridan, John F; Sen, Chandan K; Roy, Sashwati

    2016-06-15

    Milk fat globule epidermal growth factor-factor 8 (MFG-E8) is a peripheral glycoprotein that acts as a bridging molecule between the macrophage and apoptotic cells, thus executing a pivotal role in the scavenging of apoptotic cells from affected tissue. We have previously reported that apoptotic cell clearance activity or efferocytosis is compromised in diabetic wound macrophages. In this work, we test the hypothesis that MFG-E8 helps resolve inflammation, supports angiogenesis, and accelerates wound closure. MFG-E8(-/-) mice displayed impaired efferocytosis associated with exaggerated inflammatory response, poor angiogenesis, and wound closure. Wound macrophage-derived MFG-E8 was recognized as a critical driver of wound angiogenesis. Transplantation of MFG-E8(-/-) bone marrow to MFG-E8(+/+) mice resulted in impaired wound closure and compromised wound vascularization. In contrast, MFG-E8(-/-) mice that received wild-type bone marrow showed improved wound closure and improved wound vascularization. Hyperglycemia and exposure to advanced glycated end products inactivated MFG-E8, recognizing a key mechanism that complicates diabetic wound healing. Diabetic db/db mice suffered from impaired efferocytosis accompanied with persistent inflammation and slow wound closure. Topical recombinant MFG-E8 induced resolution of wound inflammation, improvements in angiogenesis, and acceleration of closure, upholding the potential of MFG-E8-directed therapeutics in diabetic wound care. Copyright © 2016 by The American Association of Immunologists, Inc.

  5. The Collyhurst Sandstone as a secondary storage unit for CCS in the East Irish Sea Basin (UK)

    NASA Astrophysics Data System (ADS)

    Gamboa, D.; Williams, J. D. O.; Kirk, K.; Gent, C. M. A.; Bentham, M.; Schofield, D. I.

    2016-12-01

    Carbon Capture and Storage (CCS) is key technology for low-carbon energy and industry. The UK hosts a large CO2 storage potential offshore with an estimated capacity of 78 Gt. The East Irish Sea Basin (EISB) is the key area for CCS in the western UK, with a CO2 storage potential of 1.7 Gt in hydrocarbon fields and in saline aquifers within the Triassic Sherwood Sandstone Formation. However, this theoretical storage capacity does not consider the secondary storage potential in the lower Permian Collyhurst Sandstone Formation. 3D seismic data were used to characterise the Collyhurst Sandstone Formation in the EISB. On the southern basin domain, numerous fault-bound blocks limit the lateral continuity of the sandstone strata, while on the northern domain the sandstones are intersected by less faults. The caprock for the Collyhurst sandstones is variable. The Manchester Marls predominate in the south, transitioning to the St. Bees evaporites towards the north. The evaporites in the EISB cause overburden faults to terminate or detach along Upper Permian strata, limiting the deformation of the underlying reservoir units. Five main storage closures have been identified in the Permian strata. In the southern and central area these are predominantly fault bounded, occurring at depths over 1000m. Despite the higher Collyhurst sandstone thickness in the southern IESB, the dolomitic nature of the caprock constitutes a storage risk in this area. Closures in the northern area are deeper (around 2000-2500m) and wider, reaching areas of 34Km2, and are overlain by evaporitic caprocks. The larger Collyhurst closures to the north underlie large Triassic fields with high storage potential. The spatial overlap favours storage plans including secondary storage units in the EISB. The results of this work also expand the understanding of prospective areas for CO2 sequestration in the East Irish Sea Basin in locations where the primary Sherwood Sandstone Formation is either too shallow, discontinuous or eroded.

  6. Transmission dynamics of the 2009 influenza A (H1N1) pandemic in India: The impact of holiday-related school closure

    PubMed Central

    Taslim Ali, Sheikh; Kadi, A. S.; Ferguson, Neil M.

    2014-01-01

    The role of social-distancing measures, such as school closures, is a controversial aspect of pandemic mitigation planning. However, the timing of 2009 pandemic provides a natural experiment for evaluating the impact of school closure during holidays on influenza transmission. To quantify the transmission intensity of the influenza A (H1N1) pdm’09 in India, by estimating the time varying reproduction number (Rt) and correlating the temporal changes in the estimates of Rt for different regions of India with the timing of school holidays. We used daily lab-confirmed case reports of influenza A (H1N1) pdm’09 in India (during 17 May’09 to 17 May’10), stratified by regions. We estimated the transmissibility of the pandemic for different regions from these time-series, using Bayesian methods applied to a branching process model of disease spread and correlated the resulting estimates with the timing of school holidays in each region. The North-west region experienced two notable waves, with the peak of the first wave coinciding with the start of a 4 week school holiday (September-October’09). In the southern region the two waves were less clear cut, though again the first peak of the first wave coincided with the start of school holidays – albeit of less than 2 weeks duration (August’09). Our analysis suggests that the school holidays had a significant influence on the epidemiology of the 2009 pandemic in India. We estimate that school holidays reduced the reproduction number by 14%–27% in different regions of India, relative to levels seen outside holiday periods. The estimates of the reproduction number obtained (with peak R values below 1.5) are compatible with those reported from other regions of the world. This work reinforces past studies showing the significant impact of school holidays on spread of 2009 pandemic virus, and by inference the role of contact patterns in children on transmission. PMID:24267871

  7. Family planning funding cuts and teen childbearing.

    PubMed

    Packham, Analisa

    2017-09-01

    Publicly funded family planning clinics provide low-cost and free contraception to nearly 1.5 million teens each year. In recent years, several states have considered legislation to defund family planning services, although little is known about how these cuts affect teen pregnancy. This paper fills this knowledge gap by exploiting a policy change in Texas that reduced funding for family planning services by 67% and resulted in over 80 clinic closures. I estimate the effects of the funding cuts on teen health outcomes using a difference-in-differences approach that compares the changes in teen birth rates in Texas counties that lost family planning funding to changes in counties outside of Texas with publicly funded clinics. I find that reducing funding for family planning services in Texas increased teen birth rates by approximately 3.4% over four years with effects concentrated 2-3 years after the initial cuts. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Process quality planning of quality function deployment for carrot syrup

    NASA Astrophysics Data System (ADS)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  9. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  10. Metallurgical characterization of brass objects from the Akko 1 shipwreck, Israel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashkenazi, D., E-mail: dana@eng.tau.ac.il; Cvikel, D.; Stern, A.

    2014-06-01

    The Akko 1 shipwreck was a small Egyptian armed vessel or auxiliary naval brig built in the eastern Mediterranean at the beginning of the 19th century. During the underwater excavations, about 230 brass hook-and-eye closures were found, mainly in the bow area. In addition, 158 brass cases were found, mainly between midships and the aft extremity of the shipwreck. Metallurgical non-destructive and destructive characterizations of selected items were performed, including radiographic testing, XRF, lead isotope analysis, optical microscopy, SEM–EDS and microhardness tests. The hook-and-eye closures and the cases were both found to be made of binary copper–zinc alloy (about 30more » wt.% zinc). While the brass cases were made from rolled sheets, hand-made using simple tools, and joined by tin–lead soldering material, the brass hook-and-eye closures were hand-made from drawn brass wire, and manufactured from commercial drawn brass bars by a cold-working process. The lead isotope analyses suggest different provenances of the raw materials used for making the brass objects, thus the different origins of the ores may hint that the brass wire and sheet were imported to the workshops in which the objects were manufactured. - Highlights: • Brass cases and hook-and-eye closures were retrieved from the Akko 1 shipwreck. • Both types of objects were made of binary copper–zinc alloy (about 30 wt.% zinc). • The cases were hand-made from rolled sheets and joined by tin–lead soldering. • Hook-and-eye closures were made from drawn brass wire manufactured by cold-working. • Lead isotope analyses suggest that the origins of the raw material were diverse.« less

  11. Closure of a human tissue biobank: individual, institutional, and field expectations during cycles of promise and disappointment

    PubMed Central

    Stephens, Neil; Dimond, Rebecca

    2015-01-01

    Biobanks are increasingly being established to act as mediators between patient-donors and researchers. In practice, some of these will close. This paper details the experiences of one such bank. We report interviews with the bank's staff and oversight group during the period when the bank ceased biobanking activity, reconfigured as a disseminator of best practice, before then closing altogether. The paper makes three distinct contributions: (i) to provide a detailed account of the establishment, operational challenges, and eventual closure of the bank, which makes clear the rapid turnover in a cycle of promise and disappointment; (ii) to explore this in terms of a novel analytical focus upon field, institutional, and individual expectations; and (iii) to use this typology to demonstrate how, even after the bank's closure, aspects of its work were reconfigured and reused in new contexts. This provides a unique empirical analysis of the under-reported issue of biobank closure. PMID:26740793

  12. Psychological theory testing versus psychometric nay-saying: comment on Neuberg et al.'s (1997) critique of the need for closure scale.

    PubMed

    Kruglanski, A W; Atash, M N; DeGrada, E; Mannetti, L; Pierro, A; Webster, D M

    1997-11-01

    S. L. Neuberg, T. N. Judice, and S. G. West (1997) faulted our work with the Need for Closure Scale (NFCS) on grounds that the NFCS lacks discriminant validity relative to S. L. Neuberg's and J. T. Newsom's (1993) Personal Need for Structure (PNS) Scale and is multidimensional, which, so they claim, renders the use of its total score inadmissible. By contrast, the present authors show that neither of the above assertions is incompatible with the underlying need for closure theory. Relations between NFCS and the PNS are to be expected, as these were designed to operationalize the very same construct (of need for closure). Furthermore, no unidimensionality of the NFCS has been claimed, and none is required to use its total score for testing various theoretically derived predictions. An instrument's ultimate utility hinges on theoretical considerations and empirical evidence rather than on questionable psychometric dogma unrelated to the substantive matters at hand.

  13. Understanding the school community’s response to school closures during the H1N1 2009 influenza pandemic

    PubMed Central

    2013-01-01

    Background During the 2009 H1N1 influenza pandemic, Australian public health officials closed schools as a strategy to mitigate the spread of the infection. This article examines school communities’ understanding of, and participation in, school closures and the beliefs and values which underpinned school responses to the closures. Methods We interviewed four school principals, 25 staff, 14 parents and 13 students in five schools in one Australian city which were either fully or partially closed during the 2009 H1N1 pandemic. Results Drawing on Thompson et al’s ethical framework for pandemic planning, we show that considerable variation existed between and within schools in their attention to ethical processes and values. In all schools, health officials and school leaders were strongly committed to providing high quality care for members of the school community. There was variation in the extent to which information was shared openly and transparently, the degree to which school community members considered themselves participants in decision-making, and the responsiveness of decision-makers to the changing situation. Reservations were expressed about the need for closures and quarantine and there was a lack of understanding of the rationale for the closures. All schools displayed a strong duty of care toward those in need, although school communities had a broader view of care than that of the public health officials. Similarly, there was a clear understanding of and commitment to protect the public from harm and to demonstrate responsible stewardship. Conclusions We conclude that school closures during an influenza pandemic represent both a challenge for public health officials and a litmus test for the level of trust in public officials, government and the school as institution. In our study, trust was the foundation upon which effective responses to the school closure were built. Trust relations within the school were the basis on which different values and beliefs were used to develop and justify the practices and strategies in response to the pandemic. PMID:23587175

  14. Evaluating Temporal Factors in Combined Interventions of Workforce Shift and School Closure for Mitigating the Spread of Influenza

    PubMed Central

    Zhang, Tianyou; Fu, Xiuju; Ma, Stefan; Xiao, Gaoxi; Wong, Limsoon; Kwoh, Chee Keong; Lees, Michael; Lee, Gary Kee Khoon; Hung, Terence

    2012-01-01

    Background It is believed that combined interventions may be more effective than individual interventions in mitigating epidemic. However there is a lack of quantitative studies on performance of the combination of individual interventions under different temporal settings. Methodology/Principal Findings To better understand the problem, we develop an individual-based simulation model running on top of contact networks based on real-life contact data in Singapore. We model and evaluate the spread of influenza epidemic with intervention strategies of workforce shift and its combination with school closure, and examine the impacts of temporal factors, namely the trigger threshold and the duration of an intervention. By comparing simulation results for intervention scenarios with different temporal factors, we find that combined interventions do not always outperform individual interventions and are more effective only when the duration is longer than 6 weeks or school closure is triggered at the 5% threshold; combined interventions may be more effective if school closure starts first when the duration is less than 4 weeks or workforce shift starts first when the duration is longer than 4 weeks. Conclusions/Significance We therefore conclude that identifying the appropriate timing configuration is crucial for achieving optimal or near optimal performance in mitigating the spread of influenza epidemic. The results of this study are useful to policy makers in deliberating and planning individual and combined interventions. PMID:22403634

  15. Association of land use and beach closure in the United ...

    EPA Pesticide Factsheets

    Swimming in natural waters (e.g., oceans, lakes, rivers) is one of most popular recreational activities in the United States. However, exposure to pathogens (e.g., Salmonella spp., Shigella spp., Cryptosporidium, Giardia, adenovirus, norovirus) in recreational waters can lead to a variety of adverse health outcomes. To protect public health and reduce the number of outbreaks associated with recreational waters, the BEACH Act was passed in 2000, which required beach regulators to develop a formal plan to assess beach water quality and to notify the public if recreational waters are unsafe. High levels of microorganisms in water often follow extreme weather events. Besides extreme weather events, the proximity of certain land uses to beaches may also have great influence on beach water quality. Microbial contaminants that lead to beach closures and human illness come mainly from land, either from discrete point sources or from diffuse non-point sources. It is expected that land use will have considerable influence on beach microbial water quality. However, to date, studies on impacts of land use on beach microbial contamination are rare, and few researchers are aware of the relationship between land use and beach closures.In this study, we analyzed beach closure data obtained from 2004 to 2013 for more than 500 beaches in the United States, and examined their associations with land use around beaches in 2006 and 2011. The results show that the number of beach clos

  16. Turbulence modeling: Near-wall turbulence and effects of rotation on turbulence

    NASA Technical Reports Server (NTRS)

    Shih, T.-H.

    1990-01-01

    Many Reynolds averaged Navier-Stokes solvers use closure models in conjunction with 'the law of the wall', rather than deal with a thin, viscous sublayer near the wall. This work is motivated by the need for better models to compute near wall turbulent flow. The authors use direct numerical simulation of fully developed channel flow and one of three dimensional turbulent boundary layer flow to develop new models. These direct numerical simulations provide detailed data that experimentalists have not been able to measure directly. Another objective of the work is to examine analytically the effects of rotation on turbulence, using Rapid Distortion Theory (RDT). This work was motivated by the observation that the pressure strain models in all current second order closure models are unable to predict the effects of rotation on turbulence.

  17. Swine-Flu Plans Put E-Learning in the Spotlight

    ERIC Educational Resources Information Center

    Davis, Michelle R.; Ash, Katie

    2009-01-01

    Last school year, many educators were caught unprepared when schools closed in response to cases of swine flu. This time around, both the federal government and school districts are putting specific online-learning measures in place to get ready for possible closures or waves of teacher and student absences because of a flu outbreak. To prepare…

  18. 78 FR 14069 - Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Shrimp Fishery Off the Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ...-BC58 Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Shrimp Fishery Off the Southern... Fishery Management Plan for the Shrimp Fishery of the South Atlantic Region (FMP) for review, approval... Atlantic states may request a concurrent closure of the penaeid shrimp (brown, pink, and white shrimp...

  19. Fort Holabird Defense Investigative Service (DIS), Base Realignment and Closure (BRAC) Cleanup Plan (BCP), Version II

    DTIC Science & Technology

    1998-12-01

    3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC

  20. Managing Temporary School Closure Due to Environmental Hazard: Lessons from New Zealand

    ERIC Educational Resources Information Center

    Stuart, Kathy L.; Patterson, Lesley G.; Johnston, David M.; Peace, Robin

    2013-01-01

    The February 2011 Canterbury earthquake was a dramatic reminder of the need for schools to have emergency management plans in place. A number of other disaster and hazard events have historically caused New Zealand schools to close temporarily, and often within a short time frame. At such times principals must act decisively and communicate…

  1. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilborn, Bill R.; Boehlecke, Robert F.

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less

  2. Optimal design of work zone median crossovers.

    DOT National Transportation Integrated Search

    2010-09-01

    The use of temporary median crossovers in work zones allows for the closure of one side of a multi-lane roadway while : maintaining two-way traffic on the opposite side. This process provides the ability for construction and maintenance crews : to co...

  3. Media reporting of tenofovir trials in Cambodia and Cameroon

    PubMed Central

    Mills, Edward; Rachlis, Beth; Wu, Ping; Wong, Elaine; Wilson, Kumanan; Singh, Sonal

    2005-01-01

    Background Two planned trials of pre-exposure prophylaxis tenofovir in Cambodia and Cameroon to prevent HIV infection in high-risk populations were closed due to activist pressure on host country governments. The international news media contributed substantially as the primary source of knowledge transfer regarding the trials. We aimed to characterize the nature of reporting, specifically focusing on the issues identified by media reports regarding each trial. Methods With the aid of an information specialist, we searched 3 electronic media databases, 5 electronic medical databases and extensively searched the Internet. In addition we contacted stakeholder groups. We included media reports addressing the trial closures, the reasons for the trial closures, and who was interviewed. We extracted data using content analysis independently, in duplicate. Results We included 24 reports on the Cambodian trial closure and 13 reports on the Cameroon trial closure. One academic news account incorrectly reported that it was an HIV vaccine trial that closed early. The primary reasons cited for the Cambodian trial closure were: a lack of medical insurance for trial related injuries (71%); human rights considerations (71%); study protocol concerns (46%); general suspicions regarding trial location (37%) and inadequate prevention counseling (29%). The primary reasons cited for the Cameroon trial closure were: inadequate access to care for seroconverters (69%); participants not sufficiently informed of risks (69%); inadequate number of staff (46%); participants being exploited (46%) and an unethical study design (38%). Only 3/23 (13%) reports acknowledged interviewing research personnel regarding the Cambodian trial, while 4/13 (30.8%) reports interviewed researchers involved in the Cameroon trial. Conclusion Our review indicates that the issues addressed and validity of the media reports of these trials is highly variable. Given the potential impact of the media in formulation of health policy related to HIV, efforts are needed to effectively engage the media during periods of controversy in the HIV/AIDS epidemic. PMID:16120208

  4. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less

  5. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less

  6. A Simple Hierarchical Pooling Data Structure for Loop Closure

    DTIC Science & Technology

    2016-10-16

    ticated agglomerative schemes at a fraction of the effort. 1.1 Related work Loop closure is a key component in robotic mapping (SLAM) [37], autonomous...appearance-only slam-fab-map 2.0. In: Robotics : Science and Systems. vol. 5. Seattle, USA (2009) 7. Dong, J., Soatto, S.: Domain size pooling in local...detection with bags of binary words. In: Intelligent Robots and Systems (IROS), 2011 IEEE/RSJ Intl. Conf. on. pp. 51–58. IEEE (2011) 9. Geiger, A

  7. Evaluation of the late merge work zone traffic control strategy.

    DOT National Transportation Integrated Search

    2004-01-01

    Several alternative lane merge strategies have been proposed in recent years to process vehicles through work zone lane closures more safely and efficiently. Among these is the late merge. With the late merge, drivers are instructed to use all lanes ...

  8. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarado, Juan; Matthews, Patrick

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less

  10. Specialty hospital market proliferation: Strategic implications for general hospitals.

    PubMed

    Al-Amin, Mona; Zinn, Jacqueline; Rosko, Michael D; Aaronson, William

    2010-01-01

    Since the early 1990s, specialty hospitals have been continuously increasing in number. A moratorium was passed in 2003 that prohibited physicians' referrals of Medicare patients to newly established specialty hospitals if the physician has ownership stakes in the hospital. Although this moratorium expired in effect in 2007, many are still demanding that the government pass new policies to discourage the proliferation of specialty hospitals. This study aimed at examining the regulatory and environmental forces that influence specialty hospitals founding rate. Specifically, we use the resource partitioning theory to investigate the relationship between general hospitals closure rates and the market entry of specialty hospitals. This study will help managers of general hospitals in their strategic thinking and planning. We rely on secondary data resources, which include the American Hospital Association, Area Resource file, census, and Center for Medicare and Medicaid Services data, to perform a longitudinal analysis of the founding rate of specialty hospital in the 48 states. Specifically, we use the negative binomial generalized estimating equation approach available through Stata 9.0 to study the effect of general hospitals closure rate and environmental variables on the proliferation of specialty hospitals. Specialty hospitals founding rate seems to be significantly related to general hospitals closure rates. Moreover, results indicate that economic, supply, regulatory, and financial conditions determine the founding rate of specialty hospitals in different states. The results from this study indicate that the closure of general hospitals creates market conditions that encourage the market entry of specialized health care delivery forms such as specialty hospitals. Managers of surviving general hospitals have to view the closure of other general hospitals not just as an opportunity to increase market share but also as a threat of competition from new forms of health care organizations.

  11. Congenital portosystemic shunts in children: a new anatomical classification correlated with surgical strategy.

    PubMed

    Blanc, Thomas; Guerin, Florent; Franchi-Abella, Stéphanie; Jacquemin, Emmanuel; Pariente, Danièle; Soubrane, Olivier; Branchereau, Sophie; Gauthier, Frédéric

    2014-07-01

    To propose an anatomical classification of congenital portosystemic shunts (CPSs) correlating with conservative surgery. CPSs entail a risk of life-threatening complications because of poor portal inflow, which may be prevented or cured by their closure. Current classifications based on portal origin of the shunt are not helpful for planning conservative surgery. Twenty-three patients who underwent at least 1 surgical procedure to close the CPSs were included in this retrospective study (1997-2012). We designed a classification according to the ending of the shunt in the caval system. We analyzed the results and outcomes of surgery according to this classification. Two patients had an extrahepatic portosystemic shunt, 17 had a portacaval shunt [subdivided in 5 end-to-side-like portal-caval, 7 side-to-side-like portal-caval, and 5 H-shaped (H-type portal-caval)], 2 had portal-to-hepatic vein shunts (portohepatic), and 2 had a persistent ductus venosus. All extrahepatic portosystemic shunts, H-type portal-caval, portohepatic, and patent ductus venosus patients had a successful 1-stage ligation. All 5 end-to-side-like portal-caval patients had a threadlike intrahepatic portal venous system; a 2-stage complete closure was successfully achieved for 4 and a partial closure for 1. The first 2 side-to-side-like portal-caval patients had a successful 2-stage closure whereas the 5 others had a 1-stage longitudinal caval partition. All patients are alive and none needed a liver transplantation. Our classification correlates the anatomy of CPSs and the surgical strategy: outcomes are good provided end-to-side-like portal-caval shunts patients have a 2-stage closure, side-to-side portal-caval shunts patients have a 1-stage caval partition, and the others have a 1-stage ligation.

  12. Use of electromagnetic induction methods to monitor remediation at the University of Connecticut landfill: 2004–2011

    USGS Publications Warehouse

    Johnson, Carole D.; White, Eric A.; Joesten, Peter K.

    2012-01-01

    Time‐lapse geophysical surveys using frequency‐domain electromagnetics (FDEM) can indirectly measure time‐varying hydrologic parameters such as fluid saturation or solute concentration. Monitoring of these processes provides insight into aquifer properties and the effectiveness of constructed controls (such as leachate interceptor trenches), as well as aquifer responses to natural or induced stresses. At the University of Connecticut landfill, noninvasive, electromagnetic induction (EMI) methods were used to monitor changes in subsurface electrical conductivity that were related to the landfill‐closure activities. After the landfill was closed, EMI methods were used to monitor changes in water saturation and water quality. As part of a long‐term monitoring plan to observe changes associated with closure, redevelopment, and remediation of the former landfill, EMI data were collected to supplement information from groundwater samples collected in wells to the south and north of the landfill. In comparison to single‐point measurements that could have been collected by conventional installation of additional monitoring wells, the EMI methods provided increased spatial coverage, and were less invasive and therefore less destructive to the wetland north of the landfill. To monitor effects of closure activities on the subsurface conductivity, EMI measurements were collected from 2004 to 2011 along discrete transects north and south of the landfill prior to, during, and after the landfill closure. In general, the results indicated an overall decline in subsurface electrical conductivity with time and with distance from the former landfill. This decline in electrical conductivity indicated that the closure and remediation efforts reduced the amount of leachate that originated from the landfill and that entered the drainages to the north and south of the landfill.

  13. Traction-assisted Internal Negative Pressure Wound Therapy With Bridging Retention Sutures to Facilitate Staged Closure of High-risk Wounds Under Tension.

    PubMed

    DeFazio, Michael V; Economides, James M; Anghel, Ersilia L; Mathis, Ryan K; Barbour, John R; Attinger, Christopher E

    2017-10-01

    Loss of domain often complicates attempts at delayed wound closure in regions of high tension. Wound temporization with traction-assisted internal negative pressure wound therapy (NPWT), using bridging retention sutures, can minimize the effects of edema and elastic recoil that contribute to progressive tissue retraction over time. The investigators evaluated the safety and efficacy of this technique for complex wound closure. Between May 2015 and November 2015, 18 consecutive patients underwent staged reconstruction of complex and/or contaminated soft tissue defects utilizing either conventional NPWT or modified NPWT with instillation and continuous dermatotraction via bridging retention sutures. Instillation of antimicrobial solution was reserved for wounds containing infected/exposed hardware or prosthetic devices. Demographic data, wound characteristics, reconstructive outcomes, and complications were reviewed retrospectively. Eighteen wounds were treated with traction-assisted internal NPWT using the conventional (n = 11) or modified instillation (n = 7) technique. Defects involved the lower extremity (n = 14), trunk (n = 3), and proximal upper extremity (n = 1), with positive cultures identified in 12 wounds (67%). Therapy continued for 3 to 8 days (mean, 4.3 days), resulting in an average wound surface area reduction of 78% (149 cm² vs. 33 cm²) at definitive closure. Seventeen wounds (94%) were closed directly, whereas the remaining defect required coverage with a local muscle flap and skin graft. At final follow-up (mean, 12 months), 89% of wounds remained closed. In 2 patients with delayed, recurrent periprosthetic infection (mean, 7.5 weeks), serial debridement/hardware removal mandated free tissue transfer for composite defect reconstruction. Traction-assisted internal NPWT provides a safe and effective alternative to reduce wound burden and facilitate definitive closure in cases where delayed reconstruction of high-tension wounds is planned.

  14. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Campbell, Scott A.; McCurdy, Greg

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM-NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transportedmore » radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. Air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content are collected at the meteorological station. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrology station are also recorded for every 10-minute interval. This report presents data collected from these stations during fiscal year (FY) 2017.« less

  15. A mixed fluid-kinetic solver for the Vlasov-Poisson equations

    NASA Astrophysics Data System (ADS)

    Cheng, Yongtao

    Plasmas are ionized gases that appear in a wide range of applications including astrophysics and space physics, as well as in laboratory settings such as in magnetically confined fusion. There are two prevailing types of modeling strategies to describe a plasma system: kinetic models and fluid models. Kinetic models evolve particle probability density distributions (PDFs) in phase space, which are accurate but computationally expensive. Fluid models evolve a small number of moments of the distribution function and reduce the dimension of the solution. However, some approximation is necessary to close the system, and finding an accurate moment closure that correctly captures the dynamics away from thermodynamic equilibrium is a difficult and still open problem. The main contributions of the present work can be divided into two main parts: (1) a new class of moment closures, based on a modification of existing quadrature-based moment-closure methods, is developed using bi-B-spline and bi-bubble representations; and (2) a novel mixed solver that combines a fluid and a kinetic solver is proposed, which uses the new class of moment-closure methods described in the first part. For the newly developed quadrature-based moment-closure based on bi-B-spline and bi-bubble representation, the explicit form of flux terms and the moment-realizability conditions are given. It is shown that while the bi-delta system is weakly hyperbolic, the newly proposed fluid models are strongly hyperbolic. Using a high-order Runge-Kutta discontinuous Galerkin method together with Strang operator splitting, the resulting models are applied to the Vlasov-Poisson-Fokker-Planck system in the high field limit. In the second part of this work, results from kinetic solver are used to provide a corrected closure to the fluid model. This correction keeps the fluid model hyperbolic and gives fluid results that match the moments as computed from the kinetic solution. Furthermore, a prolongation operation based on the bi-bubble moment-closure is used to make the first few moments of the kinetic and fluid solvers match. This results in a kinetic solver that exactly conserves mass and total energy. This mixed fluid-kinetic solver is applied to standard test problems for the Vlasov-Poisson system, including two-stream-instability problem and Landau damping.

  16. LANL continuity of operations plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratorymore » EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willoughby III, O.H.; Lukes, G.C.

    EnergySolutions, LLC operates its Mixed Waste Facility at Clive, Utah under the provisions of its State-issued Part B Permit. The facility accepts waste that contains both hazardous and radioactive contaminants. Utah is an EPA Agreement State and therefore the Utah Division of Solid and Hazardous Waste (DSHW) is authorized to regulate the hazardous waste operations at the facility. The radioactive portion of the waste is regulated by the Utah Division of Radiation Control. 40 CFR 264.142 outlines the facility requirements for Closure Costs. The owner or operator must have a detailed written estimate of the cost of closing the facilitymore » in accordance with the rules. For many years the State of Utah had relied on the facility's estimate of closure costs as the amount that needed to be funded. This amount is reviewed annually and adjusted for inflation and for changes at the facility. In 2004 the agency and the facility requested bids from independent contractors to provide their estimate for closure costs. Three engineering firms bid on the project. The facility funded the project and both the agency and the facility chose one of the firms to provide an independent estimate. The engineering firms met with both parties and toured the facility. They were also provided with the current closure cost line items. Each firm provided an estimated cost for closure of the facility at the point in the facility's active life that would make the closure most expensive. Included with the direct costs were indirect line items such as overhead, profit, mobilization, hazardous working conditions and regulatory oversight. The agency and the facility reviewed the independent estimates and negotiated a final Closure and Post-Closure Cost Estimate for the Mixed Waste Facility. There are several mechanisms allowed under the rules to fund the Closure and Post- Closure Care Funds. EnergySolutions has chosen to fund their costs through the use of an insurance policy. Changing mechanisms from an irrevocable trust to an insurance policy required extensive review by the DSHW and the Utah Attorney General's Office. The duration of the Post-Closure Care Period is generally designated as 30 years under the hazardous waste rules. The Legislature of the State of Utah commissioned a review of the need for Perpetual Care Funds for hazardous waste facilities. This fund would provide funds for maintenance and monitoring of facilities following termination of the Post-Closure Permit. The DSHW has recommended to the legislature that a perpetual care fund be created. The legislature will study the recommendation and take appropriate action. (authors)« less

  18. Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    2000-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less

  19. Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations

    NASA Technical Reports Server (NTRS)

    Johannsen, G.; Rouse, W. B.; Hillmann, K.

    1981-01-01

    A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.

  20. Simulated spinal cerebrospinal fluid leak repair: an educational model with didactic and technical components.

    PubMed

    Ghobrial, George M; Anderson, Paul A; Chitale, Rohan; Campbell, Peter G; Lobel, Darlene A; Harrop, James

    2013-10-01

    In the era of surgical resident work hour restrictions, the traditional apprenticeship model may provide fewer hours for neurosurgical residents to hone technical skills. Spinal dura mater closure or repair is 1 skill that is infrequently encountered, and persistent cerebrospinal fluid leaks are a potential morbidity. To establish an educational curriculum to train residents in spinal dura mater closure with a novel durotomy repair model. The Congress of Neurological Surgeons has developed a simulation-based model for durotomy closure with the ongoing efforts of their simulation educational committee. The core curriculum consists of didactic training materials and a technical simulation model of dural repair for the lumbar spine. Didactic pretest scores ranged from 4/11 (36%) to 10/11 (91%). Posttest scores ranged from 8/11 (73%) to 11/11 (100%). Overall, didactic improvements were demonstrated by all participants, with a mean improvement between pre- and posttest scores of 1.17 (18.5%; P = .02). The technical component consisted of 11 durotomy closures by 6 participants, where 4 participants performed multiple durotomies. Mean time to closure of the durotomy ranged from 490 to 546 seconds in the first and second closures, respectively (P = .66), whereby the median leak rate improved from 14 to 7 (P = .34). There were also demonstrative technical improvements by all. Simulated spinal dura mater repair appears to be a potentially valuable tool in the education of neurosurgery residents. The combination of a didactic and technical assessment appears to be synergistic in terms of educational development.

  1. Certification of Plutonium Standards for KAMS Neutron Multiplicity Counter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salaymeh, S.R.

    2002-05-31

    As part of the implementation of the PEIS record of decision in January of 1997, DOE will pursue two technologies to disposition fifty metric tons of its stockpile of plutonium. As a result of this and in order to expedite the closure of Rocky Flats Environmental Technology Site in Colorado, DOE decided to use existing facilities at the Savannah River Site (SRS) for storing all material containing plutonium at KAMS. A neutron multiplicity counter was designed and built to carry out receipt verification measurement at the facility. Since the material covers a wide range and different levels of impurities, itmore » is essential that we obtain a set of working standards. An agreement was drafted to select the first drums to be these standards. A plan was developed for the certification of these standards using Rocky Flat's existing nondestructive assay equipment. This paper will discuss the types of materials to be shipped to SRS, number of standards to certify for each type of material, and the certification plan. It will also discuss the activities necessary to determine the nuclear content of these working standards to be used at SRS facilities in support of shipment and receipt of the Pu containing materials. Definition of instrument qualifications, measurement control processes, measurement methodologies, and calculations necessary to report the gram quantities and their uncertainties for plutonium, americium-241, uranium-235 (if present) and neptunium-237 (if present) will also be presented.« less

  2. Endonasal Suturing of Nasoseptal Flap to Nasopharyngeal Fascia Using the V-Loc™ Wound Closure Device: 2-Dimensional Operative Video.

    PubMed

    Zwagerman, Nathan T; Geltzeiler, Mathew N; Wang, Eric W; Fernandez-Miranda, Juan C; Snyderman, Carl H; Gardner, Paul A

    2018-05-30

    We present a case of cerebrospinal fluid (CSF) leak after endoscopic endonasal resection of a large clival chordoma in an obese patient. The leak was at the lower reconstruction at the craniocervical junction and had failed repositioning. Using the V-Loc™ wound closure device (Covidien, New Haven, Connecticut) to suture the nasoseptal flap to the nasopharyngeal fascia, a water-tight seal was created and, along with a lumbar drain, the patient healed successfully.CSF leak after an endoscopic endonasal approach (EEA) to intradural pathologies remains one of the more common complications.1-4 Various closure techniques have been developed5-8 with success in mitigating this risk, but all have their limitations and rely on multiple layers including vascularized flaps like the nasoseptal flap.9-11 Endonasal suturing of graft materials offers the advantage of creating a water-tight seal. We present the use of the V-Loc™ wound closure device (Covidien) to successfully seal a postoperative CSF leak. The absorbable V-Loc™ wound closure device does not require the surgeon to tie knots, which is the most challenging step in a deep, 2-dimensional corridor. The suture is barbed and is anchored by threading the needle through a prefabricated loop at the end of the suture which locks in place. Each throw of the suture through tissue maintains the suture line as the barbs catch the tissue and prevent retraction. After successful closure, the needle can simply be cut off.The V-Loc™ wound closure device (Covidien) is a safe and effective adjunct to reconstruction after endoscopic endonasal skull base surgery as it provides an option for graft/flap suturing.A written release from the patient whose name or likeness is submitted as part of this Work is on file.

  3. Fluid equations with nonlinear wave-particle resonances^

    NASA Astrophysics Data System (ADS)

    Mattor, Nathan

    1997-11-01

    We have derived fluid equations that include linear and nonlinear wave-particle resonance effects. This greatly extends previous ``Landau-fluid'' closures, which include linear Landau damping. (G.W. Hammett and F.W. Perkins, Phys. Rev. Lett. 64,) 3019 (1990).^, (Z. Chang and J. D. Callen, Phys. Fluids B 4,) 1167 (1992). The new fluid equations are derived with no approximation regarding nonlinear kinetic interaction, and so additionally include numerous nonlinear kinetic effects. The derivation starts with the electrostatic drift kinetic equation for simplicity, with a Maxwellian distribution function. Fluid closure is accomplished through a simple integration trick applied to the drift kinetic equation, using the property that the nth moment of Maxwellian distribution is related to the nth derivative. The result is a compact closure term appearing in the highest moment equation, a term which involves a plasma dispersion function of the electrostatic field and its derivatives. The new term reduces to the linear closures in appropriate limits, so both approaches retain linear Landau damping. But the nonlinearly closed equations have additional desirable properties. Unlike linear closures, the nonlinear closure retains the time-reversibility of the original kinetic equation. We have shown directly that the nonlinear closure retains at least two nonlinear resonance effects: wave-particle trapping and Compton scattering. Other nonlinear kinetic effects are currently under investigation. The new equations correct two previous discrepancies between kinetic and Landau-fluid predictions, including a propagator discrepancy (N. Mattor, Phys. Fluids B 4,) 3952 (1992). and a numerical discrepancy for the 3-mode shearless bounded slab ITG problem. (S. E. Parker et al.), Phys. Plasmas 1, 1461 (1994). ^* In collaboration with S. E. Parker, Department of Physics, University of Colorado, Boulder. ^ Work performed at LLNL under DoE contract No. W7405-ENG-48.

  4. Flood-inundation maps for the St. Marys River at Decatur, Indiana

    USGS Publications Warehouse

    Strauch, Kellan R.

    2015-08-24

    The availability of these maps and associated Web mapping tools, along with the current river stage from USGS streamgages and forecasted flood stages from the NWS, provides emergency managers and residents with information that may be critical for flood-emergency planning and flood response activities such as evacuations and road closures, as well as for post-flood recovery efforts.

  5. 78 FR 72583 - Reef Fish Fishery of the Gulf of Mexico; 2013 Accountability Measure and Closure for Hogfish in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ..., Shrimp, and Coral and Coral Reefs Fishery Management Plans for the Gulf of Mexico (Generic ACL Amendment.... 100217097-1757-02] RIN 0648-XC981 Reef Fish Fishery of the Gulf of Mexico; 2013 Accountability Measure [email protected] . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf, which includes hogfish, is...

  6. 77 FR 37330 - Reef Fish Fishery of the Gulf of Mexico; 2012 Commercial Accountability Measure and Closure for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... effective 12:01 a.m., local time on July 1, 2012, until 12:01 a.m., local time on January 1, 2013. ADDRESSES: Electronic copies of documents supporting the final temporary rule implementing gray triggerfish management... . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf is managed under the Fishery Management Plan for...

  7. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the Corrective Action Unit No. 426, which includes the Cactus Spring Waste Trenches, located at the Tonopah Test Range. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or withoutmore » remediation), or no further action. The scope of this investigation will include drilling and collecting subsurface samples from within and below the trenches. Sampling locations will be biased toward the areas most likely to be contaminated. The Cactus Spring Waste Trenches Site is identified as one of three potential locations for buried, radioactively contaminated materials from the Double Tracks Test. This test was the first of four storage-transportation tests conducted in 1963 as part of Operation Roller Coaster. The experiment involved the use of live animals to assess the inhalation intake of a plutonium aerosol.« less

  8. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 squaremore » miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.« less

  9. Auditory skills of figure-ground and closure in air traffic controllers.

    PubMed

    Villar, Anna Carolina Nascimento Waack Braga; Pereira, Liliane Desgualdo

    2017-12-04

    To investigate the auditory skills of closure and figure-ground and factors associated with health, communication, and attention in air traffic controllers, and compare these variables with those of other civil and military servants. Study participants were sixty adults with normal audiometric thresholds divided into two groups matched for age and gender: study group (SG), comprising 30 air traffic controllers and control group (CG), composed of 30 other military and civil servants. All participants were asked a number of questions regarding their health, communication, and attention, and underwent the Speech-in-Noise Test (SIN) to assess their closure skills and the Synthetic Sentence Identification Test - Ipsilateral Competitive Message (SSI-ICM) in monotic listening to evaluate their figure-ground abilities. Data were compared using nonparametric statistical tests and logistic regression analysis. More individuals in the SG reported fatigue and/or burnout and work-related stress and showed better performance than that of individuals in the CG for the figure-ground ability. Both groups performed similarly and satisfactorily in the other hearing tests. The odds ratio for participants belonging in the SG was 5.59 and 1.24 times regarding work-related stress and SSI-ICM (right ear), respectively. Results for the variables auditory closure, self-reported health, attention, and communication were similar in both groups. The SG presented significantly better performance in auditory figure-ground compared with that of the CG. Self-reported stress and right-ear SSI-ICM were significant predictors of individuals belonging to the SG.

  10. Cost-effectiveness of Ward Closure to Control Outbreaks of Norovirus Infection in United Kingdom National Health Service Hospitals.

    PubMed

    Sadique, Zia; Lopman, Ben; Cooper, Ben S; Edmunds, W John

    2016-02-01

    Norovirus is the most common cause of outbreaks of acute gastroenteritis in National Health Service hospitals in the United Kingdom. Wards (units) are often closed to new admissions to stop the spread of the virus, but there is limited evidence describing the cost-effectiveness of ward closure. An economic analysis based on the results from a large, prospective, active-surveillance study of gastroenteritis outbreaks in hospitals and from an epidemic simulation study compared alternative ward closure options evaluated at different time points since first infection, assuming different efficacies of ward closure. A total of 232 gastroenteritis outbreaks occurring in 14 hospitals over a 1-year period were analyzed. The risk of a new outbreak in a hospital is significantly associated with the number of admission, general medical, and long-stay wards that are concurrently affected but is less affected by the level of community transmission. Ward closure leads to higher costs but reduces the number of new outbreaks by 6%-56% and the number of clinical cases by 1%-55%, depending on the efficacy of the intervention. The incremental cost per outbreak averted varies from £10 000 ($14 000) to £306 000 ($428 000), and the cost per case averted varies from £500 ($700) to £61 000 ($85 000). The cost-effectiveness of ward closure decreases as the efficacy of the intervention increases, and the cost-effectiveness increases with the timing of the intervention. The efficacy of ward closure is critical from a cost-effectiveness perspective. Ward closure may be cost-effective, particularly if targeted to high-throughput units. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  11. Tinkering with Material Resources: Operating under Ambiguous Conditions in Rock Construction Work

    ERIC Educational Resources Information Center

    Styhre, Alexander

    2009-01-01

    Purpose: Ethnographic studies of, for instance, laboratory work show that practices never reach a full closure but are always open to contingencies and ambiguities, making it possible to accommodate new empirical findings. The aim of the paper is to demonstrate that this is true also for less "high-brow" work in, for example, the…

  12. Uncertainty Quantification of Multi-Phase Closures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nadiga, Balasubramanya T.; Baglietto, Emilio

    In the ensemble-averaged dispersed phase formulation used for CFD of multiphase ows in nuclear reactor thermohydraulics, closures of interphase transfer of mass, momentum, and energy constitute, by far, the biggest source of error and uncertainty. Reliable estimators of this source of error and uncertainty are currently non-existent. Here, we report on how modern Validation and Uncertainty Quanti cation (VUQ) techniques can be leveraged to not only quantify such errors and uncertainties, but also to uncover (unintended) interactions between closures of di erent phenomena. As such this approach serves as a valuable aide in the research and development of multiphase closures.more » The joint modeling of lift, drag, wall lubrication, and turbulent dispersion|forces that lead to tranfer of momentum between the liquid and gas phases|is examined in the frame- work of validation of the adiabatic but turbulent experiments of Liu and Banko , 1993. An extensive calibration study is undertaken with a popular combination of closure relations and the popular k-ϵ turbulence model in a Bayesian framework. When a wide range of super cial liquid and gas velocities and void fractions is considered, it is found that this set of closures can be validated against the experimental data only by allowing large variations in the coe cients associated with the closures. We argue that such an extent of variation is a measure of uncertainty induced by the chosen set of closures. We also nd that while mean uid velocity and void fraction pro les are properly t, uctuating uid velocity may or may not be properly t. This aspect needs to be investigated further. The popular set of closures considered contains ad-hoc components and are undesirable from a predictive modeling point of view. Consequently, we next consider improvements that are being developed by the MIT group under CASL and which remove the ad-hoc elements. We use non-intrusive methodologies for sensitivity analysis and calibration (using Dakota) to study sensitivities of the CFD representation (STARCCM+) of uid velocity pro les and void fraction pro les in the context of Shaver and Podowski, 2015 correction to lift, and the Lubchenko et al., 2017 formulation of wall lubrication.« less

  13. "Decision sidestepping: How the motivation for closure prompts individuals to bypass decision making": Correction to Otto et al. (2016).

    PubMed

    2016-09-01

    Reports an error in "Decision sidestepping: How the motivation for closure prompts individuals to bypass decision making" by Ashley S. Otto, Joshua J. Clarkson and Frank R. Kardes ( Journal of Personality and Social Psychology , 2016[Jul], Vol 111[1], 1-16). In the article, the main heading for Experiment 3 was missing due to a production error, and the first sentence of the first paragraph of Experiment 3 should begin as follows: Experiment 2 offered support for the hypothesis that those seeking closure engage in decision sidestepping to reduce the bothersome nature of decision making. (The following abstract of the original article appeared in record 2016-30159-001.) We all too often have to make decisions—from the mundane (e.g., what to eat for breakfast) to the complex (e.g., what to buy a loved one)—and yet there exists a multitude of strategies that allows us to make a decision. This work focuses on a subset of decision strategies that allows individuals to make decisions by bypassing the decision-making process—a phenomenon we term decision sidestepping. Critical to the present manuscript, however, we contend that decision sidestepping stems from the motivation to achieve closure. We link this proposition back to the fundamental nature of closure and how those seeking closure are highly bothered by decision making. As such, we argue that the motivation to achieve closure prompts a reliance on sidestepping strategies (e.g., default bias, choice delegation, status quo bias, inaction inertia, option fixation) to reduce the bothersome nature of decision making. In support of this framework, five experiments demonstrate that (a) those seeking closure are more likely to engage in decision sidestepping, (b) the effect of closure on sidestepping stems from the bothersome nature of decision making, and (c) the reliance on sidestepping results in downstream consequences for subsequent choice. Taken together, these findings offer unique insight into the cognitive motivations stimulating a reliance on decision sidestepping and thus a novel framework by which to understand how individuals make decisions while bypassing the decision-making process. PsycINFO Database Record (c) 2016 APA, all rights reserved

  14. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  15. Performance assessment for low-level waste disposal in the UK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashworth, A.B.

    1995-12-31

    British Nuclear Fuels plc (BNFL) operate a site for the disposal of Low Level Radioactive Waste at Drigg in West Cumbria, in North-West England. HMIP are responsible for the regulation of the site with regard to environmental discharges of radioactive materials, both operational and post-closure. This paper is concerned with post-closure matters only. Two post-closure performance assessments have been carried out for this site: one by the National Radiological Protection Board (NRPB) in 1987; and a subsequent one carried out on behalf of HMIP, completed in 1991. Currently, BNFL are preparing a Safety Case for continued operation of the Driggmore » site, and it expected that the core of this Case will comprise BNFL`s own analysis of post-closure performance. HMIP has developed procedures for the assessment of this Case, based upon experience of the previous Drigg assessments, and also upon the experience of similar work carried out in the assessment of Intermediate Level Waste (ILW) disposal at both deep and shallow potential sites. This paper describes the more important features of these procedures.« less

  16. [Non-invasive assessment of the perfusion of wounds using power Doppler imaging: vacuum assisted closure versus direct wound closure].

    PubMed

    Jungius, K P; Chilla, B K; Labler, L; Teodorovic, N; Marincek, B

    2006-10-01

    The goal of our study was to assess the perfusion in wounds treated by vacuum assisted closure (VAC) compared to primary wound closure. Power Doppler Ultrasound (PDUS) was carried out under standardised conditions in 15 VAC-treated and 10 primarily closed wounds as well as on altogether 25 intraindividual reference areas. All data were sent to a work station for post-processing to determine the perfused area. Statistical data analysis was performed with the Mann-Whitney test. Both VAC-treated wounds and primarily closed wounds showed a significant increase of the perfusion when compared to the intraindividual reference area (p < 0.0001). In VAC-treated wounds, a markedly increased perfusion was measured compared to the wounds closed primarily (p < 0.0001). Perfusion decreased during treatment, but in two VAC-treated wounds, an initial increase of the perfusion was observed. Both these wounds were grossly infected. PDUS allows the quantification of the differences in wound perfusion. This can be helpful in the detection of progressive local wound infections.

  17. Notch signal reception is required in vascular smooth muscle cells for ductus arteriosus closure

    PubMed Central

    Krebs, Luke T.; Norton, Christine R.; Gridley, Thomas

    2017-01-01

    Summary The ductus arteriosus is an arterial vessel that shunts blood flow away from the lungs during fetal life, but normally occludes after birth to establish the adult circulation pattern. Failure of the ductus arteriosus to close after birth is termed patent ductus arteriosus, and is one of the most common congenital heart defects. Our previous work demonstrated that vascular smooth muscle cell expression of the Jag1 gene, which encodes a ligand for Notch family receptors, is essential for postnatal closure of the ductus arteriosus in mice. However, it was not known what cell population was responsible for receiving the Jag1-mediated signal. Here we show, using smooth muscle cell-specific deletion of the Rbpj gene, which encodes a transcription factor that mediates all canonical Notch signaling, that Notch signal reception in the vascular smooth muscle cell compartment is required for ductus arteriosus closure. These data indicate that homotypic vascular smooth muscle cell interactions are required for proper contractile smooth muscle cell differentiation and postnatal closure of the ductus arteriosus in mice. PMID:26742650

  18. Extreme Precipitation and Beach Closures in the Great Lakes Region: Evaluating Risk among the Elderly

    PubMed Central

    Bush, Kathleen F.; Fossani, Cheryl L.; Li, Shi; Mukherjee, Bhramar; Gronlund, Carina J.; O’Neill, Marie S.

    2014-01-01

    As a result of climate change, extreme precipitation events are expected to increase in frequency and intensity. Runoff from these extreme events poses threats to water quality and human health. We investigated the impact of extreme precipitation and beach closings on the risk of gastrointestinal illness (GI)-related hospital admissions among individuals 65 and older in 12 Great Lakes cities from 2000 to 2006. Poisson regression models were fit in each city, controlling for temperature and long-term time trends. City-specific estimates were combined to form an overall regional risk estimate. Approximately 40,000 GI-related hospital admissions and over 100 beach closure days were recorded from May through September during the study period. Extreme precipitation (≥90th percentile) occurring the previous day (lag 1) is significantly associated with beach closures in 8 of the 12 cities (p < 0.05). However, no association was observed between beach closures and GI-related hospital admissions. These results support previous work linking extreme precipitation to compromised recreational water quality. PMID:24534768

  19. Impact of lane closures on roadway capacity, phase 2 : [summary].

    DOT National Transportation Integrated Search

    2014-01-01

    Maintenance or construction on two-lane roads often requires setting up a work zone which closes one lane and uses the other for both traffic directions. Workers posted at each end of the work zone allow traffic to flow alternately one way and then t...

  20. Shorter duration, safer work zones, more satisfied travelers : successful applications of full road closure in work zones

    DOT National Transportation Integrated Search

    1996-06-01

    In January 1996, US Department of Transportation Secretary Federico Pena unveiled the Operation Timesaver initiative at the annual meeting of the transportation Research Board (TRB). The Secretary set a national goal of building and deploying an Inte...

  1. Surgical Techniques at Cesarean Delivery: A U.S. Survey

    PubMed Central

    Lyell, Deirdre J.; Power, Michael; Murtough, Katie; Ness, Amen; Anderson, Britta; Erickson, Kristine; Schulkin, Jay

    2016-01-01

    Objective  To assess the frequency of surgical techniques at cesarean delivery (CD) among U.S. obstetricians. Methods  Members of the American College of Obstetrician Gynecologists were randomly selected and e-mailed an online survey that assessed surgical closure techniques, demographics, and reasons. Data were analyzed using SPSS (IBM Corp., Armonk, New York, United States), descriptive statistics, and analysis of variance. Results  Our response rate was 53%, and 247 surveys were analyzed. A similar number of respondents either “always or usually” versus “rarely or never” reapproximate the rectus muscles (38.4% versus 43.3%, p  = 0.39), and close parietal peritoneum (42.5% versus 46.9%, p  = 0.46). The most frequently used techniques were double-layer hysterotomy closure among women planning future children (73.3%) and suturing versus stapling skin (67.6%); the least frequent technique was closure of visceral peritoneum (12.2%). Surgeons who perform double-layer hysterotomy closure had fewer years in practice (15.0 versus 18.7 years, p  = 0.021); surgeons who close visceral peritoneum were older (55.5 versus 46.4 years old, p  < 0.001) and had more years in practice (23.8 versus 13.8 years practice; p  < 0.001). Conclusion  Similar numbers of obstetricians either reapproximate or leave open the rectus muscles and parietal peritoneum at CD, suggesting that wide variation in practice exists. Surgeon demographics and safety concerns play a role in some techniques. PMID:28825004

  2. Fat-plug myringoplasty of ear lobule vs abdominal donor sites.

    PubMed

    Acar, Mustafa; Yazıcı, Demet; San, Turhan; Muluk, Nuray Bayar; Cingi, Cemal

    2015-04-01

    The purpose of this study is to compare the success rates of fat-graft myringoplasties harvesting adipose grafts from different donor sites (ear lobule vs abdomen). The clinical records of 61 patients (24 males and 37 females) who underwent fat-plug myringoplasty (FPM) were reviewed retrospectively. Fat from ear lobule (FEL) and abdominal fat were used as graft materials. The impact of age, gender, systemic diseases, topography of the perforation, utilization of fat graft materials of different origin on the tympanic membrane closure rate and the effect of FPM on hearing gain was analyzed. Our tympanic membrane (TM) closure rate was 82 %. No statistical significant difference was observed regarding age, gender, comorbidities (septal deviation, hypertension and diabetes mellitus) or habits (smoking). Posterior TM perforations had significantly lower healing rate. The change in TM closure rate considering different adipose tissue donor sites was not statistically significant. The hearing gain of the patients was mostly below 20 dB. Fat-plug myringoplasty (FPM) is a safe, cost-effective and easy operation for selected patients. Abdominal fat graft is as effective as ear lobe fat graft on tympanic membrane healing, has cosmetic advantages and should be taken into consideration when planning fat as the graft source.

  3. Fetal omphalocele ratios predict outcomes in prenatally diagnosed omphalocele.

    PubMed

    Montero, Freddy J; Simpson, Lynn L; Brady, Paula C; Miller, Russell S

    2011-09-01

    The objective of the study was to evaluate whether ratios considering omphalocele diameter relative to fetal biometric measurements perform better than giant omphalocele designation at predicting inability to achieve neonatal primary surgical closure. Cases of fetal omphalocele that underwent evaluation between May 2003 and July 2010 were identified. Inclusion was restricted to live births with plan for postnatal repair. Omphalocele diameter upon antenatal ultrasound was compared with abdominal circumference, femur length, and head circumference, yielding the respective omphalocele (O)/abdominal circumference (AC), O/femur length (FL), and O/head circumference (HC) ratios. The absolute measurements were used to classify giant lesions. Omphalocele ratios and giant omphalocele designations were evaluated as predictors of inability to achieve primary repair. Among 25 included cases, staged or delayed closure occurred in 52%. With an optimal cutoff of 0.21 or greater, O/HC best predicted the primary outcome (sensitivity, 84.6%; specificity, 58.3%; odds ratio, 7.7). The O/HC of 0.21 or greater outperformed giant designations. The O/HC of 0.21 or greater best predicted staged or delayed omphalocele closure. Giant omphalocele designation, regardless of definition, poorly predicted outcome. Copyright © 2011 Mosby, Inc. All rights reserved.

  4. LES-Modeling of a Partially Premixed Flame using a Deconvolution Turbulence Closure

    NASA Astrophysics Data System (ADS)

    Wang, Qing; Wu, Hao; Ihme, Matthias

    2015-11-01

    The modeling of the turbulence/chemistry interaction in partially premixed and multi-stream combustion remains an outstanding issue. By extending a recently developed constrained minimum mean-square error deconvolution (CMMSED) method, to objective of this work is to develop a source-term closure for turbulent multi-stream combustion. In this method, the chemical source term is obtained from a three-stream flamelet model, and CMMSED is used as closure model, thereby eliminating the need for presumed PDF-modeling. The model is applied to LES of a piloted turbulent jet flame with inhomogeneous inlets, and simulation results are compared with experiments. Comparisons with presumed PDF-methods are performed, and issues regarding resolution and conservation of the CMMSED method are examined. The author would like to acknowledge the support of funding from Stanford Graduate Fellowship.

  5. METHOD AND MEANS FOR CLOSING TUBES BY SPINNING

    DOEpatents

    Graves, E.E.; Coonfare, R.H.

    1958-08-26

    An improved spinning tool is described for producing a fold-free closed end on an aluminum jacketing tube such as is commonly used to protect a uranium fuel element. The tool will fit the toolholder of a lathe in which the jacket is rotated. The tool has a number of working faces so that the hemispherical end- closure is formed, the folds and wrinkles are smcothed out, and the excess metal is trimmed off in one transverse cutting operation. This tool considerably speeds up the closure process, and eliminates the need for a weld seal.

  6. Assessment and application of Reynolds stress closure models to high-speed compressible flows

    NASA Technical Reports Server (NTRS)

    Gatski, T. B.; Sarkar, S.; Speziale, C. G.; Balakrishnan, L.; Abid, R.; Anderson, E. C.

    1990-01-01

    The paper presents results from the development of higher order closure models for the phenomological modeling of high-speed compressible flows. The work presented includes the introduction of an improved pressure-strain correlationi model applicable in both the low- and high-speed regime as well as modifications to the isotropic dissipation rate to account for dilatational effects. Finally, the question of stiffness commonly associated with the solution of two-equation and Reynolds stress transport equations in wall-bounded flows is examined and ways of relaxing these restrictions are discussed.

  7. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  8. Feasibility of Using Fluorescence Spectrophotometry to Develop a Sensitive Dye Immersion Method for Container Closure Integrity Testing of Prefilled Syringes.

    PubMed

    Lu, Xujin; Lloyd, David K; Klohr, Steven E

    2016-01-01

    A feasibility study was conducted for a sensitive and robust dye immersion method for the measurement of container closure integrity of unopened prefilled syringes using fluorescence spectrophotometry as the detection method. A Varian Cary Eclipse spectrofluorometer was used with a custom-made sample holder to position the intact syringe in the sample compartment for fluorescence measurements. Methylene blue solution was initially evaluated as the fluorophore in a syringe with excitation at 607 nm and emission at 682 nm, which generated a limit of detection of 0.05 μg/mL. Further studies were conducted using rhodamine 123, a dye with stronger fluorescence. Using 480 nm excitation and 525 nm emission, the dye in the syringe could be easily detected at levels as low as 0.001 μg/mL. The relative standard deviation for 10 measurements of a sample of 0.005 μg/mL (with repositioning of the syringe after each measurement) was less than 1.1%. A number of operational parameters were optimized, including the photomultiplier tube voltage, excitation, and emission slit widths. The specificity of the testing was challenged by using marketed drug products and a protein sample, which showed no interference to the rhodamine detection. Results obtained from this study demonstrated that using rhodamine 123 for container closure integrity testing with in-situ (in-syringe) fluorescence measurements significantly enhanced the sensitivity and robustness of the testing and effectively overcame limitations of the traditional methylene blue method with visual or UV-visible absorption detection. Ensuring container closure integrity of injectable pharmaceutical products is necessary to maintain quality throughout the shelf life of a sterile drug product. Container closure integrity testing has routinely been used to evaluate closure integrity during product development and production line qualification of prefilled syringes, vials, and devices. However, container closure integrity testing has recently gained industry attention due to increased regulatory agency scrutiny regarding the analytical rigor of container closure integrity testing methods and expectations to use container closure integrity testing in lieu of sterility tests in stability programs. Methylene blue dye is often used for dye ingress testing of container closure integrity, but we found it unsuitable for reliable detection of small breaches in prefilled syringes of drug product. This work describes the suitability and advantages of using a fluorescent dye and spectroscopic detection for a robust, sensitive, and quality control-friendly container closure integrity testing method for prefilled syringes. © PDA, Inc. 2016.

  9. Sixth national stakeholder workshop summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    On June 17--18, 1998, the Department of Energy`s (DOE) Office of Worker and Community Transition convened its sixth National Stakeholder Workshop at the Ramada Plaza Hotel Old Town in Alexandria, Virginia. Approximately 325 stakeholders attended representing DOE headquarters and field offices, contractors, labor organizations, state and local government, education and community interest groups. The meeting addressed the progress made on the issues and challenges identified at the last stakeholder`s meeting in Oakland, California on April 9--11, 1997. Also discussed were the full range of the Department`s work force issues and creative solutions to the inherent challenges of simultaneously implementing themore » Department`s post Cold-War mission, work force restructuring guidance, contract reform objectives, asset disposition, performance-based management requirements, and business process improvement policies. The format of the Workshop included several plenary sessions and a number of small group discussion sessions. The small group sessions focused on topics related to labor issues, work force restructuring, work force planning, community transition, and employee concerns. The sessions provided a wide range of views on worker and community transition issues. The plenary sessions of the Workshop included presentations on the following topics: welcome and introductions; opening remarks; building a better labor-management relationship; keynote speech from Secretary of Energy Federico Pena; meeting tomorrow`s challenges (early site closures); harnessing the contracting process to encourage local growth; and, the British experience in economic conversion.« less

  10. Public opinion and understanding of advance warning arrow displays used in short-term, mobile, and moving work zones.

    DOT National Transportation Integrated Search

    2008-03-01

    "In long-term work zones on multilane highways and/or freeways, the Federal Highway Administration has interpreted the : Manual on Uniform Traffic Control Devices to mean that only one advance warning arrow displays can be used to denote : the closur...

  11. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less

  12. Sexual Orientation and U.S. Military Personnel Policy: An Update of RAND’s 1993 Study

    DTIC Science & Technology

    2010-01-01

    Klepinger, “The Sexual Behavior of Men in the United States,” Family Planning Perspectives, Vol. 25, No. 2, 1993, pp. 52–60. Black, D., Gary Gates, Seth ...Kestnbaum, “Professional Closure in the Military Labor Market: A Critique of Pure Cohesion,” in D. M. Snider and G. L. Watkins , eds., The Future of

  13. Base Realignment and Closure (BRAC) Environmental Restoration Program Management Plan

    DTIC Science & Technology

    1999-04-01

    ENVIRONMENTAL PROGRAM 5 4.1 Environmental Restoration (Cleanup, Compliance and Unexploded Ordnance) 6 4.2 National Environmental Policy Act (NEPA...Realignment Act) to create a process to close bases and realign the force infrastructure. The law addressed National Environmental Policy Act (NEPA...primarily through provisions contained in the National Defense Authorization Acts for Fiscal Years 1992 through 1997. Appendix A of the BRAC Reuse

  14. Design/build vs. traditional construction user delay modeling : an evaluation of the cost effectiveness of innovative construction methods for new construction. Part 1 : I-15 reconstruction in Davis County : evaluation of various traffic maintenance plans

    DOT National Transportation Integrated Search

    2007-05-01

    This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the...

  15. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-09-01

    Not Sampled ......... 6 2.3.2 Transformer Sites Sampled ........................ 7 2.4 Soil Sampling Protocol and Analytical Program ...Evaluation (AREE) 66. The study included evaluating the current PCB Transformer Management Program administered by the Fort Devens Environmental Management...Office (EMO), the Fort Devens Spill Contingency Plan, and the ongoing transformer inspection program . Personnel in both the Fort Devens EMO and the Fort

  16. A Comparative History of Department of Defense Management Reform from 1947 to 2005

    DTIC Science & Technology

    2006-12-01

    type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence

  17. Report on 2005 Defense Base Closure and Realignment Implementation

    DTIC Science & Technology

    2011-09-01

    been agreed to by the redevelopment authority? Yes Description of redevelopment plan: Education Conveyance to Texarkana College. Quantity of...1993 1998 2008 1995 2014 2014 2002 2016 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024...1996 2001 2008 2008 1990 2008 2008 2008 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024

  18. The Installation Funding Dilemma

    DTIC Science & Technology

    2008-04-04

    role in supporting the Army’s plans for supporting base realignment and closure (BRAC) requirements, global defense posture realignment ( GDPR ...relation to their affect on installation management funding. First, the initiative known as the GDPR will return many units to the United States from...three initiatives ( GDPR , BRAC and Modularity) and certain other restationing moves, the Army expects a net gain of about 154,000 personnel at its domestic

  19. Installation Management Command: How is the Command Supporting the Army Plan?

    DTIC Science & Technology

    2007-03-27

    BRAC), Global Defense Posture Realignment ( GDPR ), and Army Modular Force (AMF). IMCOM will continue to consolidate installations functions to free up...This restationing effort resides in three initiatives: Base Realignment and Closure (BRAC), Global Defense Posture Realignment ( GDPR ), and the Army...training on our installations.”36 The GDPR consolidates forces returning from overseas into selected CONUS installations. AMF has restructured the

  20. The economy-wide impact of pandemic influenza on the UK: a computable general equilibrium modelling experiment.

    PubMed

    Smith, Richard D; Keogh-Brown, Marcus R; Barnett, Tony; Tait, Joyce

    2009-11-19

    To estimate the potential economic impact of pandemic influenza, associated behavioural responses, school closures, and vaccination on the United Kingdom. A computable general equilibrium model of the UK economy was specified for various combinations of mortality and morbidity from pandemic influenza, vaccine efficacy, school closures, and prophylactic absenteeism using published data. The 2004 UK economy (the most up to date available with suitable economic data). The economic impact of various scenarios with different pandemic severity, vaccination, school closure, and prophylactic absenteeism specified in terms of gross domestic product, output from different economic sectors, and equivalent variation. The costs related to illness alone ranged between 0.5% and 1.0% of gross domestic product ( pound8.4bn to pound16.8bn) for low fatality scenarios, 3.3% and 4.3% ( pound55.5bn to pound72.3bn) for high fatality scenarios, and larger still for an extreme pandemic. School closure increases the economic impact, particularly for mild pandemics. If widespread behavioural change takes place and there is large scale prophylactic absence from work, the economic impact would be notably increased with few health benefits. Vaccination with a pre-pandemic vaccine could save 0.13% to 2.3% of gross domestic product ( pound2.2bn to pound38.6bn); a single dose of a matched vaccine could save 0.3% to 4.3% ( pound5.0bn to pound72.3bn); and two doses of a matched vaccine could limit the overall economic impact to about 1% of gross domestic product for all disease scenarios. Balancing school closure against "business as usual" and obtaining sufficient stocks of effective vaccine are more important factors in determining the economic impact of an influenza pandemic than is the disease itself. Prophylactic absence from work in response to fear of infection can add considerably to the economic impact.

  1. The economy-wide impact of pandemic influenza on the UK: a computable general equilibrium modelling experiment

    PubMed Central

    Keogh-Brown, Marcus R; Barnett, Tony; Tait, Joyce

    2009-01-01

    Objectives To estimate the potential economic impact of pandemic influenza, associated behavioural responses, school closures, and vaccination on the United Kingdom. Design A computable general equilibrium model of the UK economy was specified for various combinations of mortality and morbidity from pandemic influenza, vaccine efficacy, school closures, and prophylactic absenteeism using published data. Setting The 2004 UK economy (the most up to date available with suitable economic data). Main outcome measures The economic impact of various scenarios with different pandemic severity, vaccination, school closure, and prophylactic absenteeism specified in terms of gross domestic product, output from different economic sectors, and equivalent variation. Results The costs related to illness alone ranged between 0.5% and 1.0% of gross domestic product (£8.4bn to £16.8bn) for low fatality scenarios, 3.3% and 4.3% (£55.5bn to £72.3bn) for high fatality scenarios, and larger still for an extreme pandemic. School closure increases the economic impact, particularly for mild pandemics. If widespread behavioural change takes place and there is large scale prophylactic absence from work, the economic impact would be notably increased with few health benefits. Vaccination with a pre-pandemic vaccine could save 0.13% to 2.3% of gross domestic product (£2.2bn to £38.6bn); a single dose of a matched vaccine could save 0.3% to 4.3% (£5.0bn to £72.3bn); and two doses of a matched vaccine could limit the overall economic impact to about 1% of gross domestic product for all disease scenarios. Conclusion Balancing school closure against “business as usual” and obtaining sufficient stocks of effective vaccine are more important factors in determining the economic impact of an influenza pandemic than is the disease itself. Prophylactic absence from work in response to fear of infection can add considerably to the economic impact. PMID:19926697

  2. CLOSING IN ON CLOSURE PERSPECTIVES FROM HANFORD & FERNALD AN UPDATE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CONNELL, J.D.

    2004-12-22

    In World War II, the arms dramatically changed from machine guns and incendiary bombs to nuclear weapons. Hanford and Fernald, two government-run sites, were part of the infrastructure established for producing the fissile material for making these weapons, as well as building a nuclear arsenal to deter future aggression by other nations. This paper compares and contrasts, from a communications point of view, these two Department of Energy (DOE) closure sites, each with Fluor as a prime contractor. The major differences between the two sites--Hanford in Washington state and Fernald in Ohio--includes the following: size of the site and themore » workforce, timing of closure, definition of end state, DOE oversight, proximity to population centers, readiness of local population for closure, and dependence of the local economy on the site's budget. All of these elements affect how the sites' communication professionals provide information even though the objectives are the same: build public acceptance and support for DOE's mission to accelerate cleanup, interface with stakeholders to help ensure that issues are addressed and goals are met, help workers literally work themselves out of jobs--faster, and prepare the ''host'' communities to deal with the void left when the sites are closed and the government contractors are gone. The 12-months between January 04 and January 05 have seen dramatic transformations at both sites, as Fernald is now just about a year away from closure and FLuor's work at Hanford has made the transition from operations to deactivation and demolition. While Fernald continues to clean out silos of waste and ship it off site, Hanford is dealing with recent state legislation that has the potential to significantly impact the progress of cleanup. These changes have even further accentuated the differences in the content, distribution, and impact of communications.« less

  3. A historical context of municipal solid waste management in the United States.

    PubMed

    Louis, Garrick E

    2004-08-01

    Municipal solid waste management (MSWM) in the United States is a system comprised of regulatory, administrative, market, technology, and social subcomponents, and can only be understood in the context of its historical evolution. American cities lacked organized public works for street cleaning, refuse collection, water treatment, and human waste removal until the early 1800s. Recurrent epidemics forced efforts to improve public health and the environment. The belief in anticontagionism led to the construction of water treatment and sewerage works during the nineteenth century, by sanitary engineers working for regional public health authorities. This infrastructure was capital intensive and required regional institutions to finance and administer it. By the time attention turned to solid waste management in the 1880s, funding was not available for a regional infrastructure. Thus, solid waste management was established as a local responsibility, centred on nearby municipal dumps. George Waring of New York City organized solid waste management around engineering unit operations; including street sweeping, refuse collection, transportation, resource recovery and disposal. This approach was adopted nationwide, and was managed by City Departments of Sanitation. Innovations such as the introduction of trucks, motorized street sweepers, incineration, and sanitary landfill were developed in the following decades. The Resource Conservation and Recovery Act of 1976 (RCRA), is the defining legislation for MSWM practice in America today. It forced the closure of open dumps nationwide, and required regional planning for MSWM. The closure of municipal dumps caused a 'garbage crisis' in the late 1980s and early 1990s. Private companies assumed an expanded role in MSWM through regional facilities that required the transportation of MSW across state lines. These transboundary movements of MSW created the issue of flow control, in which the US Supreme Court affirmed the protection of garbage under the Commerce Clause of the Constitution. Thus MSWM in America today is largely managed by municipalities, and operated by a relatively small number of private companies. It consists of a mixture of landfill, incineration, recycling, and composting, and is regulated under RCRA, the Clean Air Act and other related federal and state laws.

  4. AFMC Civilian Retention: Forecasting Policy on the Future of the Civilian Workforce

    DTIC Science & Technology

    2006-03-01

    encourage the expansion of flexible work schedules, job sharing, part-time employment , alternative work schedules, telecommuting , and satellite work...Daft & Steers, 1986). If a person is not receiving the same perceived benefits as another, he may feel inequity which leads to dissatisfaction (Daft... drawbacks were that the commission worked in a vacuum without guidance and faulty data. The Defense Base Closure and Realignment Act of 1990

  5. Near-wall modelling of compressible turbulent flows

    NASA Technical Reports Server (NTRS)

    So, Ronald M. C.

    1990-01-01

    Work was carried out to extend the near-wall models formulated for the incompressible Reynolds stress equations to compressible flows. The idea of splitting the compressible dissipation function into a solenoidal part that is not sensitive to changes of compressibility indicators and a compressible part that is directly affected by these changes is adopted. This means that all models involving the dissipation rate could be expressed in terms of the solenoidal dissipation rate and an equation governing its transport could be formulated to close the set of compressible Reynolds stress equations. The near-wall modelling of the dissipation rate equation is investigated and its behavior near a wall is studied in detail using k-epsilon closure. It is found that all existing modelled equations give the wrong behavior for the dissipation rate near a wall. Improvements are suggested and the resultant behavior is found to be in good agreement with near-wall data. Furthermore, the present modified k-epsilon closure is used too calculate a flat plate boundary layer and the results are compared with four existing k-epsilon closures. These comparisons show that all closures tested give essentially the same flow properties, except in a region very close to the wall. In this region, the present k-epsilon closure calculations are in better agreement with measurements and direct simulation data; in particular, the behavior of the dissipation rate.

  6. Superresolving Black Hole Images with Full-Closure Sparse Modeling

    NASA Astrophysics Data System (ADS)

    Crowley, Chelsea; Akiyama, Kazunori; Fish, Vincent

    2018-01-01

    It is believed that almost all galaxies have black holes at their centers. Imaging a black hole is a primary objective to answer scientific questions relating to relativistic accretion and jet formation. The Event Horizon Telescope (EHT) is set to capture images of two nearby black holes, Sagittarius A* at the center of the Milky Way galaxy roughly 26,000 light years away and the other M87 which is in Virgo A, a large elliptical galaxy that is 50 million light years away. Sparse imaging techniques have shown great promise for reconstructing high-fidelity superresolved images of black holes from simulated data. Previous work has included the effects of atmospheric phase errors and thermal noise, but not systematic amplitude errors that arise due to miscalibration. We explore a full-closure imaging technique with sparse modeling that uses closure amplitudes and closure phases to improve the imaging process. This new technique can successfully handle data with systematic amplitude errors. Applying our technique to synthetic EHT data of M87, we find that full-closure sparse modeling can reconstruct images better than traditional methods and recover key structural information on the source, such as the shape and size of the predicted photon ring. These results suggest that our new approach will provide superior imaging performance for data from the EHT and other interferometric arrays.

  7. Enterocutaneous Fistula: Different Surgical Intervention Techniques for Closure along with Comparative Evaluation of Aluminum Paint, Karaya Gum (Hollister) and Gum Acacia for Peristomal Skin Care

    PubMed Central

    Namrata; Ahmad, Shabi

    2015-01-01

    Introduction Gastrointestinal fistulas are serious complications and are associated with high morbidity and mortality rates. In majority of the patients, fistulas are treatable. However, the treatment is very complex and often multiple therapies are required. These highly beneficial treatment options which could shorten fistula closure time also result in considerable hospital cost savings. Aim This study was planned to study aetiology, clinical presentation, morbidity and mortality of enterocutaneous fistula and to evaluate the different surgical intervention techniques for closure of enterocutaneous fistula along with a comparative evaluation of different techniques for management of peristomal skin with special emphasis on aluminum paint, Karaya gum (Hollister) and Gum Acacia. Materials and Methods This prospective observational study was conducted in the Department of Surgery, M.L.N. Medical College, Allahabad and its associated hospital (S.R.N. Hospital, Allahabad) for a period of five years. Results Majority of enterocutaneous fistula were of small bowel and medium output fistulas (500-1000 ml/24hours). Most of the patients were treated with conservative treatment as compared to surgical intervention. Large bowel fistula has maximum spontaneous closure rate compare to small bowel and duodenum. Number of orifice whether single or multiple does not appear to play statistically significant role in spontaneous closure of fistula. Serum Albumin is a significantly important predictor of spontaneous fistula closure and mortality. Surgical management appeared to be the treatment of choice in distal bowel fistula. The application of karaya gum (Hollister kit), Gum Acacia and Aluminum Paint gave similar outcome. Conclusion Postoperative fistulas are the most common aetiology of enterocutaneous fistula and various factors do play role in management. Peristomal skin care done with Karaya Gum, Gum Acacia and Aluminum Paint has almost equal efficiency in management of skin excoriation. However, role of Gum Acacia was found to be good with inflamed, excoriated and ulcerative skin in comparison to Aluminum Paint and as efficacious as Karaya Gum but at much lower cost. PMID:26816943

  8. The impact of rural hospital closures on equity of commuting time for haemodialysis patients: simulation analysis using the capacity-distance model.

    PubMed

    Matsumoto, Masatoshi; Ogawa, Takahiko; Kashima, Saori; Takeuchi, Keisuke

    2012-07-23

    Frequent and long-term commuting is a requirement for dialysis patients. Accessibility thus affects their quality of lives. In this paper, a new model for accessibility measurement is proposed in which both geographic distance and facility capacity are taken into account. Simulation of closure of rural facilities and that of capacity transfer between urban and rural facilities are conducted to evaluate the impacts of these phenomena on equity of accessibility among dialysis patients. Post code information as of August 2011 of all the 7,374 patients certified by municipalities of Hiroshima prefecture as having first or third grade renal disability were collected. Information on post code and the maximum number of outpatients (capacity) of all the 98 dialysis facilities were also collected. Using geographic information systems, patient commuting times were calculated in two models: one that takes into account road distance (distance model), and the other that takes into account both the road distance and facility capacity (capacity-distance model). Simulations of closures of rural and urban facilities were then conducted. The median commuting time among rural patients was more than twice as long as that among urban patients (15 versus 7 minutes, p<0.001). In the capacity-distance model 36.1% of patients commuted to the facilities which were different from the facilities in the distance model, creating a substantial gap of commuting time between the two models. In the simulation, when five rural public facilitiess were closed, Gini coefficient of commuting times among the patients increased by 16%, indicating a substantial worsening of equity, and the number of patients with commuting times longer than 90 minutes increased by 72 times. In contrast, closure of four urban public facilities with similar capacities did not affect these values. Closures of dialysis facilities in rural areas have a substantially larger impact on equity of commuting times among dialysis patients than closures of urban facilities. The accessibility simulations using the capacity-distance model will provide an analytic framework upon which rational resource distribution policies might be planned.

  9. The impact of rural hospital closures on equity of commuting time for haemodialysis patients: simulation analysis using the capacity-distance model

    PubMed Central

    2012-01-01

    Background Frequent and long-term commuting is a requirement for dialysis patients. Accessibility thus affects their quality of lives. In this paper, a new model for accessibility measurement is proposed in which both geographic distance and facility capacity are taken into account. Simulation of closure of rural facilities and that of capacity transfer between urban and rural facilities are conducted to evaluate the impacts of these phenomena on equity of accessibility among dialysis patients. Methods Post code information as of August 2011 of all the 7,374 patients certified by municipalities of Hiroshima prefecture as having first or third grade renal disability were collected. Information on post code and the maximum number of outpatients (capacity) of all the 98 dialysis facilities were also collected. Using geographic information systems, patient commuting times were calculated in two models: one that takes into account road distance (distance model), and the other that takes into account both the road distance and facility capacity (capacity-distance model). Simulations of closures of rural and urban facilities were then conducted. Results The median commuting time among rural patients was more than twice as long as that among urban patients (15 versus 7 minutes, p < 0.001). In the capacity-distance model 36.1% of patients commuted to the facilities which were different from the facilities in the distance model, creating a substantial gap of commuting time between the two models. In the simulation, when five rural public facilitiess were closed, Gini coefficient of commuting times among the patients increased by 16%, indicating a substantial worsening of equity, and the number of patients with commuting times longer than 90 minutes increased by 72 times. In contrast, closure of four urban public facilities with similar capacities did not affect these values. Conclusions Closures of dialysis facilities in rural areas have a substantially larger impact on equity of commuting times among dialysis patients than closures of urban facilities. The accessibility simulations using thecapacity-distance model will provide an analytic framework upon which rational resource distribution policies might be planned. PMID:22824294

  10. Evaluation of intradermal absorbable and mattress sutures to close pilonidal sinus wounds with Limberg flap: a prospective randomized comparative study.

    PubMed

    Çetin, Kenan; Sikar, Hasan Ediz; Kocaoğlu, Aytaç Emre; Kündeş, Muhammet Fikri; Karahan, Mehmet; Kaptanoğlu, Levent

    2018-02-01

    We aimed to compare skin closure techniques, standard (intermittent mattress) and continuous subcuticular sutures, following Limberg flap procedure. From July 2013 to July 2015, 92 patients with sacrococcygeal pilonidal disease were prospectively randomized into 2 groups consisting of 46 patients for both. Patients underwent sinus excision and closure with Limberg flap; continuous subcuticular suture was used in subcuticular group (SG) and intermittent mattress sutures were used in mattress group (MG) for skin closure. Characteristics of patients, features of pilonidal disease, macerations, infections, wound dehiscence, flap necrosis, operation time, time of drain removal, wound complications, early recurrences, and time till return to work were compared between the 2 groups. There was no statistical difference between groups per sex, age, body mass index, smoking, number of sinuses, depth of intergluteal sulcus, distance of incision to anus, volume of extracted tissue, number of hair follicles per cm 2 , recurrence, operation, and mean follow-up time. Two patients showed signs of wound complications (4.4%) in SG, whereas 8 cases (17.4%) showed signs in MG (P < 0.05). One patient in SG had surgical site infection and required antibiotics (2.2%), where as there were 6 cases treated in MG (13.0%) (P < 0.05). Removal of drain tube, and time till return to work rates are lower for SG than MG (P < 0.05). In conclusion, surgical procedures which include Limberg flap method and subcuticular closure may reduce infection and maceration rates. Future studies are needed to achieve greater detailed evaluation.

  11. On wave breaking for Boussinesq-type models

    NASA Astrophysics Data System (ADS)

    Kazolea, M.; Ricchiuto, M.

    2018-03-01

    We consider the issue of wave breaking closure for Boussinesq type models, and attempt at providing some more understanding of the sensitivity of some closure approaches to the numerical set-up, and in particular to mesh size. For relatively classical choices of weakly dispersive propagation models, we compare two closure strategies. The first is the hybrid method consisting in suppressing the dispersive terms in breaking regions, as initially suggested by Tonelli and Petti in 2009. The second is an eddy viscosity approach based on the solution of a a turbulent kinetic energy. The formulation follows early work by O. Nwogu in the 90's, and some more recent developments by Zhang and co-workers (Ocean Mod. 2014), adapting it to be consistent with the wave breaking detection used here. We perform a study of the behaviour of the two closures for different mesh sizes, with attention to the possibility of obtaining grid independent results. Based on a classical shallow water theory, we also suggest some monitors to quantify the different contributions to the dissipation mechanism, differentiating those associated to the scheme from those of the partial differential equation. These quantities are used to analyze the dynamics of dissipation in some classical benchmarks, and its dependence on the mesh size. Our main results show that numerical dissipation contributes very little to the the results obtained when using eddy viscosity method. This closure shows little sensitivity to the grid, and may lend itself to the development and use of non-dissipative/energy conserving numerical methods. The opposite is observed for the hybrid approach, for which numerical dissipation plays a key role, and unfortunately is sensitive to the size of the mesh. In particular, when working, the two approaches investigated provide results which are in the same ball range and which agree with what is usually reported in literature. With the hybrid method, however, the inception of instabilities is observed at mesh sizes which vary from case to case, and depend on the propagation model. These results are comforted by numerical computations on a large number of classical benchmarks. To perform a systematic study of the behaviour of the two closures for different mesh sizes, with attention to the possibility of obtaining grid independent results, To gain an insight into the mechanism actually responsible for wave breaking by providing a quantitative description of the different contributions to the dissipation mechanism, differentiating those associated to the numerical scheme from those introduced at the PDE level, To provide some understanding of the sensitivity of the above mentioned dissipation to the mesh size, To prove the equivalent capabilities of the approaches studied in reproducing simple as well as complex wave transformation, while showing the substantial difference in the underlying dissipation mechanisms. The paper is organised as follows. Section two presents the two Boussinesq approximations used in this work. Section 3 discusses the numerical approximation of the models, as well as of the wave breaking closure. The comparison of the two approaches on a wide selection of benchmarks is discussed in Section 4. The paper is ended by a summary and a sketch of the future and ongoing developments of this work.

  12. Secure closure of the tracheal incision after natural orifice transluminal endoscopic surgery with a surgical sealant (CoSeal).

    PubMed

    Liu, Yun-Hen; Wu, Yi-Cheng; Chen, Tzu-Ping; Ko, Po-Jen

    2011-09-01

    To evaluate the effectiveness of surgical sealant (CoSeal) in sealing the tracheal assess sites after transtracheal thoracoscopy. Two dogs underwent transtracheal thoracic exploration and pericardial window creation. The thoracic cavity was approached with flexible bronchoscope through a 9-mm tracheal incision. The pericardial window was performed with a needle knife via the working channel of the bronchoscope, and the tracheal assess site was closed with CoSeal using a rubber catheter. The integrity of tracheal healing was evaluated under positive pressure ventilation. Transtracheal creation of pericardial window and closure of tracheal incision with CoSeal was successfully performed in both dogs. There was no evidence of air leaks from the chest tube during positive pressure ventilation. Autopsy revealed no injury to the mediastinum and intrathoracic structure. Endoscopic closure of tracheal access site of NOTES with CoSeal appears to be a feasible technique.

  13. Paraguayan pharmacies and the sale of pseudo-abortifacients.

    PubMed

    Krayacich de Oddone, N; Shedlin, M G; Welsh, M; Potts, M; Feldblum, P

    1991-04-01

    This study was conducted in 1985 in Asunción, Paraguay, 6 years after the closure of the state supported family planning services. Data from national surveys in 1977 and 1987 permit a comparison of sources of contraceptive supplies before and after the elimination of government support for family planning. The purchase of pseudo-abortifacients from private pharmacies was used as an indication of induced abortion. After the loss of government clinics, it is suggested that some women turned to pharmacists to obtain pseudo-abortifacients when faced with unwanted pregnancy. There is an indication of increased pseudo-abortifacient use, particularly among unmarried women and those from poorer neighbourhoods.

  14. 24 CFR 3280.202 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... room or space not more than 32 square feet in surface area, whichever is less; (10) Plastic light... center; (ii) Non-structural lattice work; (iii) Mating and closure molding; and (iv) Other items not...

  15. Climate change and landscape development in post-closure safety assessment of solid radioactive waste disposal: Results of an initiative of the IAEA.

    PubMed

    Lindborg, T; Thorne, M; Andersson, E; Becker, J; Brandefelt, J; Cabianca, T; Gunia, M; Ikonen, A T K; Johansson, E; Kangasniemi, V; Kautsky, U; Kirchner, G; Klos, R; Kowe, R; Kontula, A; Kupiainen, P; Lahdenperä, A-M; Lord, N S; Lunt, D J; Näslund, J-O; Nordén, M; Norris, S; Pérez-Sánchez, D; Proverbio, A; Riekki, K; Rübel, A; Sweeck, L; Walke, R; Xu, S; Smith, G; Pröhl, G

    2018-03-01

    The International Atomic Energy Agency has coordinated an international project addressing climate change and landscape development in post-closure safety assessments of solid radioactive waste disposal. The work has been supported by results of parallel on-going research that has been published in a variety of reports and peer reviewed journal articles. The project is due to be described in detail in a forthcoming IAEA report. Noting the multi-disciplinary nature of post-closure safety assessments, here, an overview of the work is given to provide researchers in the broader fields of radioecology and radiological safety assessment with a review of the work that has been undertaken. It is hoped that such dissemination will support and promote integrated understanding and coherent treatment of climate change and landscape development within an overall assessment process. The key activities undertaken in the project were: identification of the key processes that drive environmental change (mainly those associated with climate and climate change), and description of how a relevant future may develop on a global scale; development of a methodology for characterising environmental change that is valid on a global scale, showing how modelled global changes in climate can be downscaled to provide information that may be needed for characterising environmental change in site-specific assessments, and illustrating different aspects of the methodology in a number of case studies that show the evolution of site characteristics and the implications for the dose assessment models. Overall, the study has shown that quantitative climate and landscape modelling has now developed to the stage that it can be used to define an envelope of climate and landscape change scenarios at specific sites and under specific greenhouse-gas emissions assumptions that is suitable for use in quantitative post-closure performance assessments. These scenarios are not predictions of the future, but are projections based on a well-established understanding of the important processes involved and their impacts on different types of landscape. Such projections support the understanding of, and selection of, plausible ranges of scenarios for use in post-closure safety assessments. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less

  17. Work-family conflict and self-discrepant time allocation at work.

    PubMed

    Dahm, Patricia C; Glomb, Theresa M; Manchester, Colleen Flaherty; Leroy, Sophie

    2015-05-01

    We examine the relationships between work-to-family conflict, time allocation across work activities, and the outcomes of work satisfaction, well-being, and salary in the context of self-regulation and self-discrepancy theories. We posit work-to-family conflict is associated with self-discrepant time allocation such that employees with higher levels of work-to-family conflict are likely to allocate less time than preferred to work activities that require greater self-regulatory resources (e.g., tasks that are complex, or those with longer term goals that delay rewards and closure) and allocate more time than preferred to activities that demand fewer self-regulatory resources or are replenishing (e.g., those that provide closure or are prosocial). We suggest this self-discrepant time allocation (actual vs. preferred time allocation) is one mechanism by which work-to-family conflict leads to negative employee consequences (Allen, Herst, Bruck, & Sutton, 2000; Mesmer-Magnus & Viswesvaran, 2005). Using polynomial regression and response surface methodology, we find that discrepancies between actual and preferred time allocations to work activities negatively relate to work satisfaction, psychological well-being, and physical well-being. Self-discrepant time allocation mediates the relationship between work-to-family conflict and work satisfaction and well-being, while actual time allocation (rather than the discrepancy) mediates the relationship between work-to-family conflict and salary. We find that women are more likely than men to report self-discrepant time allocations as work-to-family conflict increases. (c) 2015 APA, all rights reserved.

  18. How to Study Thermal Applications of Open-Cell Metal Foam: Experiments and Computational Fluid Dynamics

    PubMed Central

    De Schampheleire, Sven; De Jaeger, Peter; De Kerpel, Kathleen; Ameel, Bernd; Huisseune, Henk; De Paepe, Michel

    2016-01-01

    This paper reviews the available methods to study thermal applications with open-cell metal foam. Both experimental and numerical work are discussed. For experimental research, the focus of this review is on the repeatability of the results. This is a major concern, as most studies only report the dependence of thermal properties on porosity and a number of pores per linear inch (PPI-value). A different approach, which is studied in this paper, is to characterize the foam using micro tomography scans with small voxel sizes. The results of these scans are compared to correlations from the open literature. Large differences are observed. For the numerical work, the focus is on studies using computational fluid dynamics. A novel way of determining the closure terms is proposed in this work. This is done through a numerical foam model based on micro tomography scan data. With this foam model, the closure terms are determined numerically. PMID:28787894

  19. Base Realignment and Closure (BRAC) Cleanup Plan

    DTIC Science & Technology

    1995-01-01

    remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy

  20. Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less

  1. Erratum: A Comparison of Closures for Stochastic Advection-Diffusion Equations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarman, Kenneth D.; Tartakovsky, Alexandre M.

    2015-01-01

    This note corrects an error in the authors' article [SIAM/ASA J. Uncertain. Quantif., 1 (2013), pp. 319 347] in which the cited work [Neuman, Water Resour. Res., 29(3) (1993), pp. 633 645] was incorrectly represented and attributed. Concentration covariance equations presented in our article as new were in fact previously derived in the latter work. In the original abstract, the phrase " . . .we propose a closed-form approximation to two-point covariance as a measure of uncertainty. . ." should be replaced by the phrase " . . .we study a closed-form approximation to two-point covariance, previously derived in [Neumanmore » 1993], as a measure of uncertainty." The primary results in our article--the analytical and numerical comparison of existing closure methods for specific example problems are not changed by this correction.« less

  2. [Ridge preservation with synthetic nanocrystalline hydroxyapatite reduces the severity of gingival invaginations-a prospective clinical study].

    PubMed

    Reichert, Christoph; Wenghoefer, Matthias; Kutschera, Eric; Götz, Werner; Jäger, Andreas

    2014-01-01

    Gingival invaginations develop after tooth extraction and subsequent orthodontic space closure. Aetiological factors and long-term effects of gingival invaginations on oral health are nearly unknown. In addition, preventive or therapeutic strategies are rare. This prospective clinical study employing the split mouth technique was performed to investigate the effect of extraction socket augmentation with a synthetic nanocrystalline hydroxyapatite (NanoBone(®) Artoss, Rostock, Germany) on the incidence and degree of gingival invaginations. A total of 10 orthodontic patients with need for symmetric premolar extractions offering a total of 28 extractions were included in this trial. The study plan provided one extraction site to be augmented with synthetic nanocrystalline hydroxyapatite (NanoBone(®)), the other served as control. After primary wound healing, space closure was performed under defined biomechanical conditions. After space closure was accomplished, occurrence and degree of gingival invaginations as well as probing depths of the adjacent teeth mesial and distal to the extractions were determined and dental radiographs were taken. The degree of gingival invaginations and probing depths mesial and distal of the extraction were significantly reduced on NanoBone(®) augmented extraction sites. In addition, 70% of the radiographs revealed translucent and hyperdense areas on the intervention side after space closure. Apical root resorption was found in 2 patients on both the NanoBone(®) side and the control side. Ridge preservation with NanoBone(®) appeared to reduce the severity of gingival invaginations. Further investigation on long-term effects is mandatory to eliminate the appearance of adverse effects.

  3. Observations and Models of Highly Intermittent Phytoplankton Distributions

    PubMed Central

    Mandal, Sandip; Locke, Christopher; Tanaka, Mamoru; Yamazaki, Hidekatsu

    2014-01-01

    The measurement of phytoplankton distributions in ocean ecosystems provides the basis for elucidating the influences of physical processes on plankton dynamics. Technological advances allow for measurement of phytoplankton data to greater resolution, displaying high spatial variability. In conventional mathematical models, the mean value of the measured variable is approximated to compare with the model output, which may misinterpret the reality of planktonic ecosystems, especially at the microscale level. To consider intermittency of variables, in this work, a new modelling approach to the planktonic ecosystem is applied, called the closure approach. Using this approach for a simple nutrient-phytoplankton model, we have shown how consideration of the fluctuating parts of model variables can affect system dynamics. Also, we have found a critical value of variance of overall fluctuating terms below which the conventional non-closure model and the mean value from the closure model exhibit the same result. This analysis gives an idea about the importance of the fluctuating parts of model variables and about when to use the closure approach. Comparisons of plot of mean versus standard deviation of phytoplankton at different depths, obtained using this new approach with real observations, give this approach good conformity. PMID:24787740

  4. [The modification in surgical technique of incision and closure vault of the vagina during vaginal hysterectomy on the incidence of vault haematoma].

    PubMed

    Malinowski, Andrzej; Mołas, Justyna; Maciołek-Blewniewska, Grazyna; Cieślak, Jarosław

    2006-02-01

    Vault haematoma is one of the most common complication of vaginal hysterectomy. The aim of this work was to analyse the effects of a modification of incision and closure technique of the vaginal vault on the incidence of vault haematoma after vaginal hysterectomy. The study group consisted of 333 women of whom 49 (group A) underwent vaginal hysterectomy traditional technique of incision and closure of the vaginal vault, an 284 (group B) modified technique. Following parameters were evaluated: number of vault haematomas, blood loss, postoperative fever, required antibiotics, length of hospital stay. The risk of vault haematoma was significantly lower in the group B (1,06% vs 12,4%). Loss of blood was higher in group A (310 ml vs 206 ml). Incidence of postoperative fever was in 12,2% patients from group A, and 1,4% from group B. The length of hospitalization was lower for women in group B (4,3 days compared with 7,3 days). The modification of incision and closure technique of the vaginal vault during vaginal hysterectomy is recommended to minimise intra- and postoperative complications.

  5. Multi-Material Closure Model for High-Order Finite Element Lagrangian Hydrodynamics

    DOE PAGES

    Dobrev, V. A.; Kolev, T. V.; Rieben, R. N.; ...

    2016-04-27

    We present a new closure model for single fluid, multi-material Lagrangian hydrodynamics and its application to high-order finite element discretizations of these equations [1]. The model is general with respect to the number of materials, dimension and space and time discretizations. Knowledge about exact material interfaces is not required. Material indicator functions are evolved by a closure computation at each quadrature point of mixed cells, which can be viewed as a high-order variational generalization of the method of Tipton [2]. This computation is defined by the notion of partial non-instantaneous pressure equilibration, while the full pressure equilibration is achieved bymore » both the closure model and the hydrodynamic motion. Exchange of internal energy between materials is derived through entropy considerations, that is, every material produces positive entropy, and the total entropy production is maximized in compression and minimized in expansion. Results are presented for standard one-dimensional two-material problems, followed by two-dimensional and three-dimensional multi-material high-velocity impact arbitrary Lagrangian–Eulerian calculations. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.« less

  6. Near-wall effects for momentum, heat and mass transport in gas-particle suspensions at moderate Reynolds numbers

    NASA Astrophysics Data System (ADS)

    Radl, Stefan; Municchi, Federico; Goniva, Christoph

    2016-11-01

    Understanding transport phenomena in fluid-particle systems is of primary importance for the design of large-scale equipment, e.g., in the chemical industry. Typically, the analysis of such systems is performed by numerically solving a set of partial differential equations modeling the particle phase and the fluid phase as interpenetrating continua. Such models require a number of closure models that are often constructed via spatial filtering of data obtained from particle-resolved direct numerical simulations (PR-DNS). In the present work we make use of PR-DNS to evaluate corrections to existing closure models. Specifically, we aim on accounting for wall effects on the fluid-particle drag force and the particle-individual Nusselt number. We then propose an improved closure model to be used in particle-unresolved Euler-Lagrange (PU-EL) simulations. We demonstrate that such an advanced closure should account for a dimensionless filter size, as well as a normalized distance from the wall. In addition, we make an attempt to model the filtered fluid velocity profile in wall-bounded suspension flows. The authors acknowledge funding from the European Commission through FP7 Grant Agreement No. 604656, as well as VSC-3 and dcluster.tugraz.at.

  7. Multi-Material Closure Model for High-Order Finite Element Lagrangian Hydrodynamics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobrev, V. A.; Kolev, T. V.; Rieben, R. N.

    We present a new closure model for single fluid, multi-material Lagrangian hydrodynamics and its application to high-order finite element discretizations of these equations [1]. The model is general with respect to the number of materials, dimension and space and time discretizations. Knowledge about exact material interfaces is not required. Material indicator functions are evolved by a closure computation at each quadrature point of mixed cells, which can be viewed as a high-order variational generalization of the method of Tipton [2]. This computation is defined by the notion of partial non-instantaneous pressure equilibration, while the full pressure equilibration is achieved bymore » both the closure model and the hydrodynamic motion. Exchange of internal energy between materials is derived through entropy considerations, that is, every material produces positive entropy, and the total entropy production is maximized in compression and minimized in expansion. Results are presented for standard one-dimensional two-material problems, followed by two-dimensional and three-dimensional multi-material high-velocity impact arbitrary Lagrangian–Eulerian calculations. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.« less

  8. Investigation of Mechanical Breakdowns Leading to Lock Closures

    DTIC Science & Technology

    2017-06-01

    wide variety of issues lead to emergency clo- sures, yet no specific problem (s) that frequently cause unscheduled clo- sures were identified. Table 2-3...Reporting Used to create basic work orders, report problems or malfunctions, or request work to be done. Used to create and process work orders from...work order page for recording the failure class, problem , cause, and remedy (Figure 3-1). Appendix C includes a full list of failure classes

  9. Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gano, K. A.; Lucas, J. G.; Lindsey, C. T.

    2011-06-30

    This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N,more » and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.« less

  10. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less

  12. Major incidents in rural areas: managing a pandemic A/H1N1/2009 cluster.

    PubMed

    Stark, Cameron; Garman, Elaine; McMenamin, Jim; McCormick, Duncan; Oates, Ken

    2010-01-01

    Pandemic Influenza (A/H1N1/2009) caused worldwide concern because of its potential to spread rapidly in human populations. In Scotland, Government policy had been to seek to contain the spread of the virus for as long as possible in order to allow time for service preparations, and for vaccine development and supply. The first major Scottish outbreak of pandemic A/H1N1/2009 was in the rural area of Cowal and Bute. After two initial cases were identified, contact tracing found a cluster of cases associated with a football supporters' bus. Within 3 weeks, 130 cases had been identified in the area. Rapid provision of treatment doses of anti-viral medication to cases and prophylactic treatment of asymptomatic close contacts, advice on self-isolation and, where required, interruption of transmission by temporary school closure, were successful in containing the outbreak. Pre-existing Major Incident and Pandemic Flu plans were used and adapted to the particular circumstances of the outbreak and the area. Supporting operational decision-making as close to the cases as possible allowed for speed and flexibility of response. Contact tracing and tracking of cases and results was performed by specialist public health staff who were geographically removed from the cases. This was possible because of effective use of existing telephone conferencing facilities, clarity of roles, and frequent communication among staff working on all areas of the response. Basing the work on established plans, staff experience of rural areas and rural service provision was successful.

  13. Effectiveness of closure of public places with time delay in disease control.

    PubMed

    Wang, Zhenggang; Szeto, Kwok Yip; Leung, Frederick Chi-Ching

    2008-08-25

    A theoretical basis for the evaluation of the effciency of quarantine measure is developed in a SIR model with time delay. In this model, the effectiveness of the closure of public places such as schools in disease control, modeled as a high degree node in a social network, is evaluated by considering the effect of the time delay in the identification of the infected. In the context of the SIR model, the relation between the number of infectious individuals who are identified with time delay and then quarantined and those who are not identified and continue spreading the virus are investigated numerically. The social network for the simulation is modeled by a scale free network. Closure measures are applied to those infected nodes with high degrees. The effectiveness of the measure can be controlled by the present value of the critical degree K(C): only those nodes with degree higher than K(C) will be quarantined. The cost C(Q) incurred for the closure measure is assumed to be proportional to the total links rendered inactive as a result of the measure, and generally decreases with K(C), while the medical cost C(Q) incurred for virus spreading increases with K(C). The total social cost (C(M) + C(Q)) will have a minimum at a critical K(*), which depends on the ratio of medical cost coeffcient alpha(M) and closure cost coeffcient alpha(Q). Our simulation results demonstrate a mathematical procedure to evaluate the effciency of quarantine measure. Although the numerical work is based on a scale free network, the procedure can be readily generalized and applied to a more realistic social network to determine the proper closure measure in future epidemics.

  14. A new formulation of the dispersion tensor in homogeneous porous media

    NASA Astrophysics Data System (ADS)

    Valdés-Parada, Francisco J.; Lasseux, Didier; Bellet, Fabien

    2016-04-01

    Dispersion is the result of two mass transport processes, namely molecular diffusion, which is a pure mixing effect and hydrodynamic dispersion, which combines mixing and spreading. The identification of each contribution is crucial and is often misinterpreted. Traditionally, under a volume averaging framework, a single closure problem is solved and the resulting fields are substituted into diffusive and dispersive filters. However the diffusive filter (that leads to the effective diffusivity) allows passing information from convection, which leads to an incorrect definition of the effective medium coefficients composing the total dispersion tensor. In this work, we revisit the definitions of the effective diffusivity and hydrodynamic dispersion tensors using the method of volume averaging. Our analysis shows that, in the context of laminar flow with or without inertial effects, two closure problems need to be computed in order to correctly define the corresponding effective medium coefficients. The first closure problem is associated to momentum transport and needs to be solved for a prescribed Reynolds number and flow orientation. The second closure problem is related to mass transport and it is solved first with a zero Péclet number and second with the required Péclet number and flow orientation. All the closure problems are written using closure variables only as required by the upscaling method. The total dispersion tensor is shown to depend on the microstructure, macroscopic flow angles, the cell (or pore) Péclet number and the cell (or pore) Reynolds number. It is non-symmetric in the general case. The condition for quasi-symmetry is highlighted. The functionality of the longitudinal and transverse components of this tensor with the flow angle is investigated for a 2D model porous structure obtaining consistent results with previous studies.

  15. The Golden Spiral Flap: A New Flap Design that Allows for Closure of Larger Wounds under Reduced Tension – How Studying Nature’s Own Design Led to the Development of a New Surgical Technique

    PubMed Central

    Paul, Sharad P.

    2016-01-01

    This paper details the study of biodynamic excisional skin tension lines on the scalp and the development of a new flap technique for closure of scalp wounds. Recently, a study by this author, on pigskin, replicated whorls by placing tissue under rapid stretch using saline tissue expanders, by recreating rapid dermo-epidermal shear of skin – thereby concluding that the golden spiral pattern is nature’s own pattern for rapid expansion. Given the relationship between tissue expansion and stretch has been shown to cause deformation gradients that have both elastic and growth factors, the author set out to test the hypothesis that a golden spiral pattern therefore would be more efficient at closing wounds under less tension when compared with standard semicircular rotational flap patterns. The author conducted a series of experiments, both on pigskin (to first confirm the hypothesis, using a recently developed computerized tensiometer) and later a clinical study. This paper presents a new random pivotal flap technique for skin closures on the head and neck: the golden spiral flap. Biomechanics, planning, and advantages of this new flap are described in this paper. PMID:27900320

  16. The mental and physical health of miners following the 1992 national pit closure programme: a cross sectional survey using General Health Questionnaire GHQ-12 and Short Form SF-36.

    PubMed

    Avery, A J; Betts, D S; Whittington, A; Heron, T B; Wilson, S H; Reeves, J P

    1998-05-01

    In the twelve months following the announcement of the UK pit closure programme in October 1992, 22,500 miners were made redundant. In 1994 we undertook a cross-sectional survey to determine whether the mental and physical health of men who had been employed in the Nottinghamshire mining industry differed from that of the general population. A postal questionnaire was designed incorporating the General Health Questionnaire (GHQ-12), and six domains from SF-36. Questionnaires were sent to 1064 miners and ex-miners and 2097 other men in Nottinghamshire. Non-responders were sent two reminders. The final response rate was 51%. The percentage of responders with GHQ-12 scores of three or more (suggesting psychological disorder) was 46% for those still employed in the mining industry, 52% for unemployed former miners and 22% for working non-miners (odds ratios: 3.0 [95% C.I. 2.2-4.1] for current miners and 3.9 [95% C.I. 2.6-5.7] for unemployed miners compared with working non-miners). The miners and ex-miners also had lower scores (suggesting greater morbidity) for each of the SF-36 domains tested. When stratifying for age in respondents of social classes IIIM-V the scores of current miners were significantly lower than those of working non-miners (P < 0.01). This study suggests that when surveyed in 1994, men who had been employed in three Nottinghamshire collieries in 1992 were psychologically and physically disadvantaged compared with working non-miners. Whether these findings are a result of pit closures is uncertain. However, significant potential health needs have been demonstrated.

  17. Communicating Performance Assessments Results - 13609

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Layton, Mark

    2013-07-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to bemore » used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)« less

  18. BSA Delta Qualification 2, volume 3, book 1

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.

  19. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  20. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  1. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  2. On-orbit demonstration of automated closure and capture using ESA-developed proximity operations technologies and an existing, serviceable NASA Explorer Platform spacecraft

    NASA Technical Reports Server (NTRS)

    Hohwiesner, Bill; Claudinon, Bernard

    1991-01-01

    The European Space Agency (ESA) has been working to develop an autonomous rendezvous and docking capability since 1984 to enable Hermes to automatically dock with Columbus. As a result, ESA with Matra, MBB, and other space companies have developed technologies that are also directly supportive of the current NASA initiative for Automated Rendezvous and Capture. Fairchild and Matra would like to discuss the results of the applicable ESA/Matra rendezvous and capture developments, and suggest how these capabilities could be used, together with an existing NASA Explorer Platform satellite, to minimize new development and accomplish a cost effective automatic closure and capture demonstration program. Several RV sensors have been developed at breadboard level for the Hermes/Columbus program by Matra, MBB, and SAAB. Detailed algorithms for automatic rendezvous, closure, and capture have been developed by ESA and CNES for application with Hermes to Columbus rendezvous and docking, and they currently are being verified with closed-loop software simulation. The algorithms have multiple closed-loop control modes and phases starting at long range using GPS navigation. Differential navigation is used for coast/continuous thrust homing, holdpoint acquisition, V-bar hopping, and station point acquisition. The proximity operation sensor is used for final closure and capture. A subset of these algorithms, comprising the proximity operations algorithms, could easily be extracted and tailored to a limited objective closure and capture flight demonstration.

  3. Age-dependent modulation of the somatosensory network upon eye closure.

    PubMed

    Brodoehl, Stefan; Klingner, Carsten; Witte, Otto W

    2016-02-01

    Eye closure even in complete darkness can improve somatosensory perception by switching the brain to a uni-sensory processing mode. This causes an increased information flow between the thalamus and the somatosensory cortex while decreasing modulation by the visual cortex. Previous work suggests that these modulations are age-dependent and that the benefit in somatosensory performance due to eye closing diminishes with age. The cause of this age-dependency and to what extent somatosensory processing is involved remains unclear. Therefore, we intended to characterize the underlying age-dependent modifications in the interaction and connectivity of different sensory networks caused by eye closure. We performed functional MR-imaging with tactile stimulation of the right hand under the conditions of opened and closed eyes in healthy young and elderly participants. Conditional Granger causality analysis was performed to assess the somatosensory and visual networks, including the thalamus. Independent of age, eye closure improved the information transfer from the thalamus to and within the somatosensory cortex. However, beyond that, we found an age-dependent recruitment strategy. Whereas young participants were characterized by an optimized information flow within the relays of the somatosensory network, elderly participants revealed a stronger modulatory influence of the visual network upon the somatosensory cortex. Our results demonstrate that the modulation of the somatosensory and visual networks by eye closure diminishes with age and that the dominance of the visual system is more pronounced in the aging brain. Copyright © 2015 Elsevier B.V. All rights reserved.

  4. Phase dependence of transport-aperture coordination variability reveals control strategy of reach-to-grasp movements.

    PubMed

    Rand, Miya K; Shimansky, Y P; Hossain, Abul B M I; Stelmach, George E

    2010-11-01

    Based on an assumption of movement control optimality in reach-to-grasp movements, we have recently developed a mathematical model of transport-aperture coordination (TAC), according to which the hand-target distance is a function of hand velocity and acceleration, aperture magnitude, and aperture velocity and acceleration (Rand et al. in Exp Brain Res 188:263-274, 2008). Reach-to-grasp movements were performed by young adults under four different reaching speeds and two different transport distances. The residual error magnitude of fitting the above model to data across different trials and subjects was minimal for the aperture-closure phase, but relatively much greater for the aperture-opening phase, indicating considerable difference in TAC variability between those phases. This study's goal is to identify the main reasons for that difference and obtain insights into the control strategy of reach-to-grasp movements. TAC variability within the aperture-opening phase of a single trial was found minimal, indicating that TAC variability between trials was not due to execution noise, but rather a result of inter-trial and inter-subject variability of motor plan. At the same time, the dependence of the extent of trial-to-trial variability of TAC in that phase on the speed of hand transport was sharply inconsistent with the concept of speed-accuracy trade-off: the lower the speed, the larger the variability. Conversely, the dependence of the extent of TAC variability in the aperture-closure phase on hand transport speed was consistent with that concept. Taking into account recent evidence that the cost of neural information processing is substantial for movement planning, the dependence of TAC variability in the aperture-opening phase on task performance conditions suggests that it is not the movement time that the CNS saves in that phase, but the cost of neuro-computational resources and metabolic energy required for TAC regulation in that phase. Thus, the CNS performs a trade-off between that cost and TAC regulation accuracy. It is further discussed that such trade-off is possible because, due to a special control law that governs optimal switching from aperture opening to aperture closure, the inter-trial variability of the end of aperture opening does not affect the high accuracy of TAC regulation in the subsequent aperture-closure phase.

  5. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  6. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  7. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  8. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  9. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  10. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1994-04-07

    Landfill (AOCs 4, 5, 18, and 40) were identified in the MEP as the highest priority (Priority 1A) for remediation. As such, these sites proceeded...Spring Brook Landfills OUs, etc. 4.1.4 Environmental Restoration Early Actions Strategy The Site Investigation (SI) Data Package concept was developed...Approach for the Shepley’ s Hill and Cold Spring Brook Landfill Sites . Fort Devens. Massachusetts, prepared for USAEC; February. Ecology & Environment

  11. Economic Development Assistance for Communities Affected by Employment Changes Due to Military Base Closures (BRAC)

    DTIC Science & Technology

    2009-01-30

    to assess loan risk are the following: (1) the length of the proposed repayment period; (2) the ratio of expected annual debt service...develops an environmental remediation plan to enable the conveyance of surplus federal land to other entities.1 Military facilities were closed and...1 For a detailed examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base

  12. U.S. Global Defense Posture, 1783-2011

    DTIC Science & Technology

    2012-01-01

    in global affairs to further the nation’s interests. Second, as a consequence of its victory in the Spanish -American War of 1898, the United States...planning process . Despite their importance, the Pentagon needs to ensure that its global defense posture is developed from a top-down, not a bottom-up...to the continental United States (CONUS) or leaving it, both of which have implications for the base realignment and closure process . Despite this

  13. Department of the Navy FY 1993 Budget Estimates, DoD Base Closure and Realignment Program 2. Justification Data Submitted to Congress January 1992

    DTIC Science & Technology

    1992-01-01

    DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (0) + ( E ): (SO0O) (A) PRODUCTION OF PLANS AND SPECIFICATIONS ......... _1: (B) ALL... E ) IN-HOUSE . . . . . . . . . . . . . . . . . . . . . . . . (4) CONSTRUCTION START .................... .. - (MONTH AND...Z. (2) BASIS: (A) STANDARD OR DEFINITIVE DESIGN: YES__NO.. _ (B) WHERE DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (D) + ( E

  14. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  15. Retrospective: lessons learned from the Santa Barbara project and their implications for health information exchange.

    PubMed

    Frohlich, Jonah; Karp, Sam; Smith, Mark D; Sujansky, Walter

    2007-01-01

    Despite its closure in December 2006, the Santa Barbara County Care Data Exchange helped focus national attention on the value of health information exchange (HIE). This in turn led to the federal government's plan to establish regional health information organizations (RHIOs). During its existence, the project pioneered innovative approaches, including certification of health information technology vendors, a community-wide governance model, and deployment of a peer-to-peer technical model now in wider use. RHIO efforts will benefit from the project's lessons about the need for an incremental development approach, rigorous implementation processes, early attention to privacy and liability concerns, and planning for a sustainable business model.

  16. Closing unprofitable services: ethical issues and management responses.

    PubMed

    Summers, James W

    1985-01-01

    Closing unprofitable services often requires as much analysis, public relations, marketing, and planning as any expansion. Further, issues about ethics, indigents, and the hospital mission force the consideration of values explicitly if a marketing fiasco is to be avoided. By integrating values analysis with more traditional management tasks, the challenges of service closure can be converted into opportunities to demonstrate how your institution has met or exceeded its ethical obligations. A case involving OB is developed to show how ethical and management issues blend into one another. Specific strategies for consensus building and marketing of the legitimacy of the hospital's position are given. Institutional ethics committees are one primary mechanism for developing a plan to benefit from unpleasant decisions.

  17. Hospital infection prevention and control issues relevant to extensive floods.

    PubMed

    Apisarnthanarak, Anucha; Mundy, Linda M; Khawcharoenporn, Thana; Glen Mayhall, C

    2013-02-01

    The devastating clinical and economic implications of floods exemplify the need for effective global infection prevention and control (IPC) strategies for natural disasters. Reopening of hospitals after excessive flooding requires a balance between meeting the medical needs of the surrounding communities and restoration of a safe hospital environment. Postflood hospital preparedness plans are a key issue for infection control epidemiologists, healthcare providers, patients, and hospital administrators. We provide recent IPC experiences related to reopening of a hospital after extensive black-water floods necessitated hospital closures in Thailand and the United States. These experiences provide a foundation for the future design, execution, and analysis of black-water flood preparedness plans by IPC stakeholders.

  18. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  19. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  20. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less

  1. Numerical and Physical Modelling of Bubbly Flow Phenomena - Final Report to the Department of Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrea Prosperetti

    This report describes the main features of the results obtained in the course of this project. A new approach to the systematic development of closure relations for the averaged equations of disperse multiphase flow is outlined. The focus of the project is on spatially non-uniform systems and several aspects in which such systems differ from uniform ones are described. Then, the procedure used in deriving the closure relations is given and some explicit results shown. The report also contains a list of publications supported by this grant and a list of the persons involved in the work.

  2. The reconstructive microsurgery ladder in orthopaedics.

    PubMed

    Tintle, Scott M; Levin, L Scott

    2013-03-01

    Since the advent of the operating microscope by Julius Jacobson in 1960, reconstructive microsurgery has become an integral part of extremity reconstruction and orthopaedics. During World War I, with the influx of severe extremity trauma Harold Gillies introduced the concept of the reconstructive ladder for wound closure. The concept of the reconstructive ladder goes from simple to complex means of attaining wound closure. Over the last half century microsurgery has continued to evolve and progress. We now have a microsurgical reconstructive ladder. The microsurgical reconstruction ladder is based upon the early work on revascularization and replantation extending through the procedures that are described in this article. Copyright © 2013. Published by Elsevier Ltd.

  3. 40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 264.146 Section 264.146 Protection of Environment... mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more...

  4. Use of cryopoor plasma for albumin replacement and continuous antimicrobial infusion for treatment of septic peritonitis in a dog.

    PubMed

    Ropski, Meaghan K; Guillaumin, Julien; Monnig, Andrea A; Townsend, Katy; McLoughlin, Mary A

    2017-05-01

    To report the successful management of a dog with septic peritonitis and septic shock secondary to enterectomy dehiscence using novel techniques for identification of intestinal dehiscence and for septic shock treatment. A 5-year-old castrated male Bernese Mountain Dog presented for lethargy 6 days following enterotomy for foreign body obstruction. Septic peritonitis was identified due to dehiscence of the enterotomy site, and resection and anastomosis were performed using a gastrointestinal anastomosis and thoracoabdominal stapling device. Postoperatively the patient experienced severe hypotension, which responded to norepinephrine constant rate infusion (CRI) after failing to improve with fluid therapy or dopamine CRI. Further treatment included antimicrobial CRI and supportive care including careful fluid therapy. Due to low effective circulating volume paired with intersititial fluid overload and large volume abdominal effusion, fluid therapy consisted of a combination of human serum albumin, canine albumin, synthetic colloids, and isotonic crystalloids. Cryopoor plasma (CPP) was used as a source of canine albumin and intravascular volume. On Day 4, food dye was given through a nasogastric tube due to suspicion of dehiscence of the anastomosis site. Dehiscence was confirmed during abdominal exploratory, and a second resection and anastomosis was performed. Abdominal partial closure with vacuum-assisted closure device was performed. Supportive care was continued with CPP CRI and imipenem CRI. Planned relaparotomy to change the vacuum-assisted closure device was performed 48 hours later, with abdominal closure 96 hours after anastomosis. The patient was discharged on Day 15. Recheck 12 months later was normal. This case includes novel techniques such food dye via nasogastric tube to identify anastomosis dehiscence, use of CPP as a source of canine albumin, and antimicrobial CRI in a dog with septic peritonitis. © Veterinary Emergency and Critical Care Society 2017.

  5. North American Bats and Mines Project: A cooperative approach for integrating bat conservation and mine-land reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ducummon, S.L.

    Inactive underground mines now provide essential habitat for more than half of North America`s 44 bat species, including some of the largest remaining populations. Thousands of abandoned mines have already been closed or are slated for safety closures, and many are destroyed during renewed mining in historic districts. The available evidence suggests that millions of bats have already been lost due to these closures. Bats are primary predators of night-flying insects that cost American farmers and foresters billions of dollars annually, therefore, threats to bat survival are cause for serious concern. Fortunately, mine closure methods exist that protect both batsmore » and humans. Bat Conservation International (BCI) and the USDI-Bureau of Land Management founded the North American Bats and Mines Project to provide national leadership and coordination to minimize the loss of mine-roosting bats. This partnership has involved federal and state mine-land and wildlife managers and the mining industry. BCI has trained hundreds of mine-land and wildlife managers nationwide in mine assessment techniques for bats and bat-compatible closure methods, published technical information on bats and mine-land management, presented papers on bats and mines at national mining and wildlife conferences, and collaborated with numerous federal, state, and private partners to protect some of the most important mine-roosting bat populations. Our new mining industry initiative, Mining for Habitat, is designed to develop bat habitat conservation and enhancement plans for active mining operations. It includes the creation of cost-effective artificial underground bat roosts using surplus mining materials such as old mine-truck tires and culverts buried beneath waste rock.« less

  6. Life Support Goals Including High Closure and Low Mass Should Be Reconsidered Using Systems Analysis

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2017-01-01

    Recycling space life support systems have been built and tested since the 1960s and have operated on the International Space Station (ISS) since the mid 2000s. The development of space life support has been guided by a general consensus focused on two important related goals, increasing system closure and reducing launch mass. High closure is achieved by recycling crew waste products such as carbon dioxide and condensed humidity. Recycling directly reduces the mass of oxygen and water for the crew that must be launched from Earth. The launch mass of life support can be further reduced by developing recycling systems with lower hardware mass and reduced power. The life support consensus has also favored using biological systems. The goal of increasing closure using biological systems suggests that food should be grown in space and that biological processors be used for air, water, and waste recycling. The goal of reducing launch mass led to use of Equivalent System Mass (ESM) in life support advocacy and technology selection. The recent consensus assumes that the recycling systems architecture developed in the 1960s and implemented on ISS will be used on all future long missions. NASA and other project organizations use the standard systems engineering process to guide hardware development. The systems process was used to develop ISS life support, but it has been less emphasized in planning future systems for the moon and Mars. Since such missions are far in the future, there has been less immediate need for systems engineering analysis to consider trade-offs, reliability, and Life Cycle Cost (LCC). Preliminary systems analysis suggests that the life support consensus concepts should be revised to reflect systems engineering requirements.

  7. US school morbidity and mortality, mandatory vaccination, institution closure, and interventions implemented during the 2009 influenza A H1N1 pandemic.

    PubMed

    Rebmann, Terri; Elliott, Michael B; Swick, Zachary; Reddick, David

    2013-03-01

    The 2009 H1N1 pandemic disproportionately affected school-aged children, but only school-based outbreak case studies have been conducted. The purposes of this study were to evaluate US academic institutions' experiences during the 2009 H1N1 pandemic in terms of infection prevention interventions implemented and to examine factors associated with school closure during the pandemic. An online survey was sent to school nurses in May through July 2011. Hierarchical logistic regressions were used to determine predictive models for having a mandatory H1N1 vaccination policy for school nurses and school closure. In all, 1,997 nurses from 26 states participated. Very few nurses (3.3%, n=65) reported having a mandatory H1N1 influenza vaccination policy; nurses were more likely than all other school employees (p<.001) to be mandated to receive vaccine. Determinants of having a mandatory H1N1 vaccination policy were being employed by a hospital or public health agency, and the school being located in a western or northeastern state. Factors related to school closure included being in a western or northeastern state, having higher H1N1-related morbidity/mortality, being a school nurse employed by a public health agency or hospital, and being a private school. The most commonly implemented interventions included encouraging staff and students to exercise hand hygiene and increasing classroom cleaning; least commonly implemented interventions included discouraging face-to-face meetings, training staff on H1N1 influenza and/or respiratory hygiene, and discouraging handshaking. Schools should develop and continue to improve their pandemic plans, including collaborating with community response agencies.

  8. Optimization of Highway Work Zone Decisions Considering Short-Term and Long-Term Impacts

    DTIC Science & Technology

    2010-01-01

    strategies which can minimize the one-time work zone cost. Considering the complex and combinatorial nature of this optimization problem, a heuristic...combination of lane closure and traffic control strategies which can minimize the one-time work zone cost. Considering the complex and combinatorial nature ...zone) NV # the number of vehicle classes NPV $ Net Present Value p’(t) % Adjusted traffic diversion rate at time t p(t) % Natural diversion rate

  9. Vietnam: expanding the social security system.

    PubMed

    Pruzin, D

    1996-01-01

    Viet Nam's shift toward a market-oriented economy has been associated with annual gross domestic product growth of more than 8% over the past 5 years. At the same time, the emergence of private-sector enterprises and subsequent closure of many state-run enterprises have had profound implications for Viet Nam's social protection systems. At present, only 5.6 million of the country's 33 million workers are covered under the state-run social insurance system. In 1995, the government moved to include private enterprises with 10 or more employees in its state benefits system. The International Labor Organization (ILO) has been working with the Vietnamese Government to design and implement a social security system that would extend coverage progressively to excluded sectors and provide support to workers who have become unemployed as a result of the economic transition process. At its Eighth National Congress, the Vietnamese Communist Party approved a 5-year social and economic plan calling for such an expansion of the social insurance system as well as for a guaranteed standard of living for pensioners. To facilitate anticipated changes, activities that were previously divided between the Ministry of Labor, Invalids, and Social Affairs and the Vietnam General Confederation of Labor have been assigned to the newly formed Vietnam Social Insurance (VSI) Organization. Under consideration is a plan to combine some VSI activities with those of the Vietnam Health Insurance Organization. The ILO will assist with training, computerization, and social security fund investing. Noncompliance is a major obstacle to planned expansion of the social security system; about 90% of private firms are still not paying into the system.

  10. Bioinspired polydimethylsiloxane-based composites with high shear resistance against wet tissue.

    PubMed

    Fischer, Sarah C L; Levy, Oren; Kroner, Elmar; Hensel, René; Karp, Jeffrey M; Arzt, Eduard

    2016-08-01

    Patterned microstructures represent a potential approach for improving current wound closure strategies. Microstructures can be fabricated by multiple techniques including replica molding of soft polymer-based materials. However, polymeric microstructures often lack the required shear resistance with tissue needed for wound closure. In this work, scalable microstructures made from composites based on polydimethylsiloxane (PDMS) were explored to enhance the shear resistance with wet tissue. To achieve suitable mechanical properties, PDMS was reinforced by incorporation of polyethylene (PE) particles into the pre-polymer and by coating PE particle reinforced substrates with parylene. The reinforced microstructures showed a 6-fold enhancement, the coated structures even a 13-fold enhancement in Young׳s modulus over pure PDMS. Shear tests of mushroom-shaped microstructures (diameter 450µm, length 1mm) against chicken muscle tissue demonstrate first correlations that will be useful for future design of wound closure or stabilization implants. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  11. Modeling of Multi-Kilovolt X-ray Driven Ablation and Closure of Pinholes during Point-Projection Backlit Imaging

    NASA Astrophysics Data System (ADS)

    Bullock, A. B.; Landen, O. L.; Bradley, D. K.

    2000-10-01

    Pinhole-assisted point-projection backlighting of large samples with few µm pinholes can result in pinhole closure due to x-ray driven ablation of the high Z pinhole substrate, thereby potentially limiting the usefulness of this imaging method. The results of a previous study[1] using streaked 1-D backlit imaging of 25 mm W wires at the OMEGA laser are compared to simulations produced by HYADES, a 1-D Lagrangian hydrodynamics code. Interestingly, the observed image resolution stays fixed while the pinhole transmission drops within 1-2 ns, suggesting rapid filling by a long scale-length of low density substrate material. These results will be compared to time-dependent HYADES predictions of pinhole closure timescales and resolution. 1 A.B. bullock, D.K. Bradley, and O.L. Landen, to be published in RSI (2001). *This work was performed under the auspices of the U.S. Department of Energy by University of California/Lawrence Livermore National Laboratory under Contract No. W-7405-Eng-48.

  12. Turbulent mass flux closure modeling for variable density turbulence in the wake of an air-entraining transom stern

    NASA Astrophysics Data System (ADS)

    Hendrickson, Kelli; Yue, Dick

    2016-11-01

    This work presents the development and a priori testing of closure models for the incompressible highly-variable density turbulent (IHVDT) flow in the near wake region of a transom stern. This complex, three-dimensional flow includes three regions with distinctly different flow behavior: (i) the convergent corner waves that originate from the body and collide on the ship center plane; (ii) the "rooster tail" that forms from the collision; and (iii) the diverging wave train. The characteristics of these regions involve violent free-surface flows and breaking waves with significant turbulent mass flux (TMF) at Atwood number At = (ρ2 -ρ1) / (ρ2 +ρ1) 1 for which there is little guidance in turbulence closure modeling for the momentum and scalar transport along the wake. Utilizing datasets from high-resolution simulations of the near wake of a canonical three-dimensional transom stern using conservative Volume-of-Fluid (cVOF), implicit Large Eddy Simulation (iLES), and Boundary Data Immersion Method (BDIM), we develop explicit algebraic turbulent mass flux closure models that incorporate the most relevant physical processes. Performance of these models in predicting the turbulent mass flux in all three regions of the wake will be presented. Office of Naval Research.

  13. Analysis and Comparison with DNS of a Stochastic Model for the Relative Motion of High-Stokes-Number Particles in Isotropic Turbulence

    NASA Astrophysics Data System (ADS)

    Dhariwal, Rohit; Rani, Sarma; Koch, Donald

    2015-11-01

    In an earlier work, Rani, Dhariwal, and Koch (JFM, Vol. 756, 2014) developed an analytical closure for the diffusion current in the PDF transport equation describing the relative motion of high-Stokes-number particle pairs in isotropic turbulence. In this study, an improved closure was developed for the diffusion coefficient, such that the motion of the particle-pair center of mass is taken into account. Using the earlier and the new analytical closures, Langevin simulations of pair relative motion were performed for four particle Stokes numbers, Stη = 10 , 20 , 40 , 80 and at two Taylor micro-scale Reynolds numbers Reλ = 76 , 131 . Detailed comparisons of the analytical model predictions with those of DNS were undertaken. It is seen that the pair relative motion statistics obtained from the improved theory show excellent agreement with the DNS statistics. The radial distribution functions (RDFs), and relative velocity PDFs obtained from the improved-closure-based Langevin simulations are found to be in very good agreement with those from DNS. It was found that the RDFs and relative velocity RMS increased with Reλ for all Stη . The collision kernel also increased strongly with Reλ , since it depended on the RDF and the radial relative velocities.

  14. Fluid-Structure Interaction Analysis of Ruptured Mitral Chordae Tendineae.

    PubMed

    Toma, Milan; Bloodworth, Charles H; Pierce, Eric L; Einstein, Daniel R; Cochran, Richard P; Yoganathan, Ajit P; Kunzelman, Karyn S

    2017-03-01

    The chordal structure is a part of mitral valve geometry that has been commonly neglected or simplified in computational modeling due to its complexity. However, these simplifications cannot be used when investigating the roles of individual chordae tendineae in mitral valve closure. For the first time, advancements in imaging, computational techniques, and hardware technology make it possible to create models of the mitral valve without simplifications to its complex geometry, and to quickly run validated computer simulations that more realistically capture its function. Such simulations can then be used for a detailed analysis of chordae-related diseases. In this work, a comprehensive model of a subject-specific mitral valve with detailed chordal structure is used to analyze the distinct role played by individual chordae in closure of the mitral valve leaflets. Mitral closure was simulated for 51 possible chordal rupture points. Resultant regurgitant orifice area and strain change in the chordae at the papillary muscle tips were then calculated to examine the role of each ruptured chorda in the mitral valve closure. For certain subclassifications of chordae, regurgitant orifice area was found to trend positively with ruptured chordal diameter, and strain changes correlated negatively with regurgitant orifice area. Further advancements in clinical imaging modalities, coupled with the next generation of computational techniques will enable more physiologically realistic simulations.

  15. Fluid-Structure Interaction Analysis of Ruptured Mitral Chordae Tendineae

    PubMed Central

    Toma, Milan; Bloodworth, Charles H.; Pierce, Eric L.; Einstein, Daniel R.; Cochran, Richard P.; Yoganathan, Ajit P.; Kunzelman, Karyn S.

    2016-01-01

    The chordal structure is a part of mitral valve geometry that has been commonly neglected or simplified in computational modeling due to its complexity. However, these simplifications cannot be used when investigating the roles of individual chordae tendineae in mitral valve closure. For the first time, advancements in imaging, computational techniques, and hardware technology make it possible to create models of the mitral valve without simplifications to its complex geometry, and to quickly run validated computer simulations that more realistically capture its function. Such simulations can then be used for a detailed analysis of chordae-related diseases. In this work, a comprehensive model of a subject-specific mitral valve with detailed chordal structure is used to analyze the distinct role played by individual chordae in closure of the mitral valve leaflets. Mitral closure was simulated for 51 possible chordal rupture points. Resultant regurgitant orifice area and strain change in the chordae at the papillary muscle tips were then calculated to examine the role of each ruptured chorda in the mitral valve closure. For certain subclassifications of chordae, regurgitant orifice area was found to trend positively with ruptured chordal diameter, and strain changes correlated negatively with regurgitant orifice area. Further advancements in clinical imaging modalities, coupled with the next generation of computational techniques will enable more physiologically realistic simulations. PMID:27624659

  16. Putting Foucault to Work: Understanding Power in a Rural School

    ERIC Educational Resources Information Center

    Freie, Carrie; Eppley, Karen

    2014-01-01

    This case study uses the work of Michel Foucault to challenge the normalization of the principal's role and to examine the complex power relations of a rural school and community in the midst of a closure/consolidation and subsequent reopening as a charter school. In so doing, we move beyond analysis of best practices and toward a more theoretical…

  17. A field investigation of concrete patches containing pyrament blended concrete.

    DOT National Transportation Integrated Search

    1994-01-01

    During roadway repairs, state highway officials try to minimize lane closure times. This reduces inconvenience to travelers, reduces traffic control needs, and helps minimize work zone accidents. For rapid repairs, materials that provide high early s...

  18. CT based 3D printing is superior to transesophageal echocardiography for pre-procedure planning in left atrial appendage device closure.

    PubMed

    Obasare, Edinrin; Mainigi, Sumeet K; Morris, D Lynn; Slipczuk, Leandro; Goykhman, Igor; Friend, Evan; Ziccardi, Mary Rodriguez; Pressman, Gregg S

    2018-05-01

    Accurate assessment of the left atrial appendage (LAA) is important for pre-procedure planning when utilizing device closure for stroke reduction. Sizing is traditionally done with transesophageal echocardiography (TEE) but this is not always precise. Three-dimensional (3D) printing of the LAA may be more accurate. 24 patients underwent Watchman device (WD) implantation (71 ± 11 years, 42% female). All had complete 2-dimensional TEE. Fourteen also had cardiac computed tomography (CCT) with 3D printing to produce a latex model of the LAA for pre-procedure planning. Device implantation was unsuccessful in 2 cases (one with and one without a 3D model). The model correlated perfectly with implanted device size (R 2  = 1; p < 0.001), while TEE-predicted size showed inferior correlation (R 2  = 0.34; 95% CI 0.23-0.98, p = 0.03). Fisher's exact test showed the model better predicted final WD size than TEE (100 vs. 60%, p = 0.02). Use of the model was associated with reduced procedure time (70 ± 20 vs. 107 ± 53 min, p = 0.03), anesthesia time (134 ± 31 vs. 182 ± 61 min, p = 0.03), and fluoroscopy time (11 ± 4 vs. 20 ± 13 min, p = 0.02). Absence of peri-device leak was also more likely when the model was used (92 vs. 56%, p = 0.04). There were trends towards reduced trans-septal puncture to catheter removal time (50 ± 20 vs. 73 ± 36 min, p = 0.07), number of device deployments (1.3 ± 0.5 vs. 2.0 ± 1.2, p = 0.08), and number of devices used (1.3 ± 0.5 vs. 1.9 ± 0.9, p = 0.07). Patient specific models of the LAA improve precision in closure device sizing. Use of the printed model allowed rapid and intuitive location of the best landing zone for the device.

  19. 40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 265.146 Section 265.146 Protection of Environment... Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or...

  20. Is there unity in Europe? First survey of EUPSA delegates on the management of gastroschisis.

    PubMed

    Zani, Augusto; Ruttenstock, Elke; Davenport, Mark; Ade-Ajayi, Niyi

    2013-02-01

    To report the first European survey on the current management of gastroschisis and ascertain the degree of variability between centers. A 10-question survey was administered at the 2011 European Paediatric Surgeons' Association (EUPSA) Congress. Questionnaires were completed by 205 delegates from 39 countries. A total of 21 responses (10%) were incomplete and voided. The remaining 184 were divided on the basis of following region of practice: Western Europe (WE, n = 102), Eastern Europe (EE, n = 59), and non-European countries (n = 23). Differences between WE and EE were analyzed using contingency tests. p < 0.05 was considered significant. A total of 15% WE and 2% EE responders work in centers where antenatal magnetic resonance imaging scans are routinely used. Nonplanned delivery is the most popular approach (WE 46%, EE 58%). Primary closure is the preferred choice (WE 92%, EE 86%), and it is achieved by operative fascial closure in the majority (WE 80%, EE 75%) rather than by Bianchi technique (WE 20%, EE 25%). Staged reduction and closure is less popular (WE 8%, EE 14%), and it is achieved by custom-made silo (WE 25%, EE 12.5%), preformed silo (PFS) followed by surgical closure (WE 63%, EE 75%), or PFS followed by sutureless closure (WE 12%, EE 12.5%). Objection to PFS in WE is mainly related to surgeons' lack of confidence in the technique (40%), whereas in EE it is due to unavailability and high cost (62%, p = 0.01). In case of associated intestinal atresia, immediate resection and anastomosis is preferred by 60% of WE surgeons versus 35% of EE surgeons (p = 0.03), who equally favor primary closure and delayed surgery (33%). Nutrition is preferably delivered by peripheral long line in WE (64%) and by central line inserted in the first week of life in EE (62%, p = 0.003). Primary fascial closure is currently the preferred method of gastroschisis closure across Europe. Aspects of care such as strategy for intestinal atresia and delivery of parenteral nutrition differ significantly between WE and EE. Economic considerations appear to influence management strategy particularly in EE. A Europe-wide audit appears warranted to identify whether this survey reflects actual practice. Georg Thieme Verlag KG Stuttgart · New York.

Top