Sample records for coal development office

  1. Fossil Energy Program Annual Progress Report for the Period April 1, 2000 through March 31, 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Judkins, RR

    This report covers progress made at Oak Ridge National Laboratory (ORNL) on research and development projects that contribute to the advancement of fossil energy technologies. Projects on the ORNL Fossil Energy Program are supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, the DOE National Energy Technology Laboratory (NETL), the DOE Fossil Energy Clean Coal Technology (CCT) Program, the DOE National Petroleum Technology Office, and the DOE Fossil Energy Office of Strategic Petroleum Reserve (SPR). The ORNL Fossil Energy Program research and development activities cover the areas of coal, clean coal technology, gas, petroleum, and support tomore » the SPR. An important part of the Fossil Energy Program is technical management of all activities on the DOE Fossil Energy Advanced Research (AR) Materials Program. The AR Materials Program involves research at other DOE and government laboratories, at universities, and at industrial organizations.« less

  2. 44. Blue Coal Corporation Office Building (foreground), Huber Breaker (left), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Blue Coal Corporation Office Building (foreground), Huber Breaker (left), Retail Coal Storage Bins (far center) Photograph taken by George Harven - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  3. Remote sensing of strippable coal reserves and mine inventory in part of the Warrior Coal Field in Alabama

    NASA Technical Reports Server (NTRS)

    Joiner, T. J.; Copeland, C. W., Jr.; Russell, D. D.; Evans, F. E., Jr.; Sapp, C. D.; Boone, P. A.

    1978-01-01

    Methods by which estimates of the remaining reserves of strippable coal in Alabama could be made were developed. Information acquired from NASA's Earth Resources Office was used to analyze and map existing surface mines in a four-quadrangle area in west central Alabama. Using this information and traditional methods for mapping coal reserves, an estimate of remaining strippable reserves was derived. Techniques for the computer analysis of remotely sensed data and other types of available coal data were developed to produce an estimate of strippable coal reserves for a second four-quadrangle area. Both areas lie in the Warrior coal field, the most prolific and active of Alabama's coal fields. They were chosen because of the amount and type of coal mining in the area, their location relative to urban areas, and the amount and availability of base data necessary for this type of study.

  4. Illinois Clean Coal Institute 2005 annual report. Final technical report for the period September 1st, 2004, through August 31, 2005 on projects funded by the Illinois Department of Commerce and Economic Opportunity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-11-08

    This final technical report contains the abstracts and executive summaries of projects funded through the Illinois Clean Coal Institute solicitation entitled 'Request for proposals No. 04-1(ICCI/RFP04-1)'. Support of these projects is by the Office of Coal Development and Department of Commerce and Economic Opportunity. The projects fall into the following categories: advanced coal mining technologies; coal preparation and coal production business practice; management of coal combustion byproducts; commercialization and technology transfer. Final project extensions are also recorded.

  5. Coal: special report number 2

    USGS Publications Warehouse

    Keenlyne, Kent D.

    1977-01-01

    The Fish and Wildlife Service has extensive biological expertise within the Department of Interior and exerts national leadership in the management and protection of the nation's fish and wildlife resources, their habitat, and environment. Specifically, the Office of Biological Services obtains and assimilates biological and environmental data and identifies additional informational needs and means to provide environmental and biological input into major natural resource decisions. Coal Coordinators assist in carrying out Fish and Wildlife Service involvement in the Interior Department Coal Leasing Program through a multi-stage process designed to assemble existing fish and wildlife inventory data and to prioritize fish and wildlife values in areas subject to coal leasing and associated development. This report is designed to identify possible areas of concern for wildlife and its habitat in Wyoming in the development of coal and the associate implication of land use changes. This report summarizes past and present development of the coal resource in Wyoming in anticipation of future identification of data needs for making sound resource decisions in the development of coal.

  6. 20 CFR 726.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S... Director means the Director, Division of Coal Mine Workers' Compensation, Office of Workers' Compensation...

  7. 20 CFR 726.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S... Director means the Director, Division of Coal Mine Workers' Compensation, Office of Workers' Compensation...

  8. 20 CFR 726.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S... Director means the Director, Division of Coal Mine Workers' Compensation, Office of Workers' Compensation...

  9. Coal Combustion Science quarterly progress report, April--June 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardesty, D.R.; Hurt, R.H.; Baxter, L.L.

    1992-09-01

    The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the Pittsburgh Energy Technology Center (PETC) Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency (IEA) Coal Combustion Science Project. Specific tasks include: The characterization of the physical and chemical processes that constitute the early devolatilization phase of coal combustion: Characterization of the combustion behavior of selected coals under conditions relevant to industria pulverized coal-fired furnaces; and to establish a quantitative understanding of themore » mechanisms and rates of transformation, fragmentation, and deposition of mineral matter in coal combustion environments as a function of coal type, particle size and temperature, the initial forms and distributions of mineral species in the unreacted coal, and the local gas temperature and composition.« less

  10. 30 CFR 71.220 - Status change reports.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY HEALTH STANDARDS-SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Sampling... status of the mine or designated work position to the MSHA District Office or to any other MSHA office...

  11. 20 CFR 726.6 - The Office of Workers' Compensation Programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL... number of functions with respect to the regulation of both the self-insurance and commercial insurance... Coal Mine Workers' Compensation, Office of Workers' Compensation Programs, U.S. Department of Labor...

  12. Coal Combustion Science quarterly progress report, April--June 1992. Task 1, Coal devolatilization: Task 2, Coal char combustion; Task 3, Fate of mineral matter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardesty, D.R.; Hurt, R.H.; Baxter, L.L.

    1992-09-01

    The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the Pittsburgh Energy Technology Center (PETC) Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency (IEA) Coal Combustion Science Project. Specific tasks include: The characterization of the physical and chemical processes that constitute the early devolatilization phase of coal combustion: Characterization of the combustion behavior of selected coals under conditions relevant to industria pulverized coal-fired furnaces; and to establish a quantitative understanding of themore » mechanisms and rates of transformation, fragmentation, and deposition of mineral matter in coal combustion environments as a function of coal type, particle size and temperature, the initial forms and distributions of mineral species in the unreacted coal, and the local gas temperature and composition.« less

  13. Effect of ground control mesh on dust sampling and explosion mitigation.

    PubMed

    Alexander, D W; Chasko, L L

    2015-07-01

    Researchers from the National Institute for Occupational Safety and Health's Office of Mine Safety and Health Research conducted an assessment of the effects that ground control mesh might have on rock and float coal dust distribution in a coal mine. The increased use of mesh to control roof and rib spall introduces additional elevated surfaces on which rock or coal dust can collect. It is possible to increase the potential for dust explosion propagation if any float coal dust is not adequately inerted. In addition, the mesh may interfere with the collection of representative dust samples when using the pan-and-brush sampling method developed by the U.S. Bureau of Mines and used by the Mine Safety and Health Administration for band sampling. This study estimates the additional coal or rock dust that could accumulate on mesh and develops a means to collect representative dust samples from meshed entries.

  14. Effect of ground control mesh on dust sampling and explosion mitigation

    PubMed Central

    Alexander, D.W.; Chasko, L.L.

    2017-01-01

    Researchers from the National Institute for Occupational Safety and Health’s Office of Mine Safety and Health Research conducted an assessment of the effects that ground control mesh might have on rock and float coal dust distribution in a coal mine. The increased use of mesh to control roof and rib spall introduces additional elevated surfaces on which rock or coal dust can collect. It is possible to increase the potential for dust explosion propagation if any float coal dust is not adequately inerted. In addition, the mesh may interfere with the collection of representative dust samples when using the pan-and-brush sampling method developed by the U.S. Bureau of Mines and used by the Mine Safety and Health Administration for band sampling. This study estimates the additional coal or rock dust that could accumulate on mesh and develops a means to collect representative dust samples from meshed entries. PMID:28936000

  15. Brief history of the Office of Energy Research and Development: Federal Energy Office/Federal Energy Administration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hibbard, W.R. Jr.

    A number of Important Issues in energy research and development which warrant special attention by the Energy Research and Development Office (ERDO) are identified and examined. Six matters considered to be of sufficient weight to be labeled Important Issues are: nuclear reactor siting policy: nuclear energy centers; the development of solar electric power; exploitation of western oil shale; improvements in mining technology for coal; assuring uranium fuel supplies; and automotive energy systems. The environmental issue is treated separately. Actions that ERDO can take to help resolve the issues are discussed.

  16. National coal resource assessment non-proprietary data: Location, stratigraphy, and coal quality for selected tertiary coal in the Northern Rocky Mountains and Great Plains region

    USGS Publications Warehouse

    Flores, Romeo M.; Ochs, A.M.; Stricker, G.D.; Ellis, M.S.; Roberts, S.B.; Keighin, C.W.; Murphy, E.C.; Cavaroc, V.V.; Johnson, R.C.; Wilde, E.M.

    1999-01-01

    One of the objectives of the National Coal Resource Assessment in the Northern Rocky Mountains and Great Plains region was to compile stratigraphic and coal quality-trace-element data on selected and potentially minable coal beds and zones of the Fort Union Formation (Paleocene) and equivalent formations. In order to implement this objective, drill-hole information was compiled from hard-copy and digital files of the: (1) U.S. Bureau of Land Management (BLM) offices in Casper, Rawlins, and Rock Springs, Wyoming, and in Billings, Montana, (2) State geological surveys of Montana, North Dakota, and Wyoming, (3) Wyoming Department of Environmental Quality in Cheyenne, (4) U.S. Office of Surface Mining in Denver, Colorado, (5) U.S. Geological Survey, National Coal Resource Data System (NCRDS) in Reston, Virginia, (6) U.S. Geological Survey coal publications, (7) university theses, and (8) mining companies.

  17. Fast and safe gas detection from underground coal fire by drone fly over.

    PubMed

    Dunnington, Lucila; Nakagawa, Masami

    2017-10-01

    Underground coal fires start naturally or as a result of human activities. Besides burning away the important non-renewable energy resource and causing financial losses, burning coal seams emit carbon dioxide, carbon monoxide, sulfur oxide and methane, and is a leading cause of smog, acid rain, global warming, and air toxins. In the U.S. alone, the combined cost of coal-fire remediation projects that have been completed, budgeted, or projected by the U.S. Department of the Interior's Office of Surface Mining Remediation and Enforcement (OSM), exceeds $1 billion. It is estimated that these fires generate as much as 3% of the world's annual carbon dioxide emissions and consume as much as 5% of its minable coal. Considering the magnitude of environmental impact and economic loss caused by burning underground coal seams, we have developed a new, safe, reliable surface measurement of coal fire gases to assess the nature of underground coal fires. We use a drone mounted with gas sensors. Drone collected gas concentration data provides a safe alternative for evaluating the rank of a burning coal seam. In this study, a new method of determining coal rank by gas ratios is developed. Coal rank is valuable for defining parameters of a coal seam such as burn temperature, burn rate, and volume of burning seam. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Federal Coal Directory

    NASA Astrophysics Data System (ADS)

    A new catalog that provides the addresses and the telephone numbers of more than 400 national and local coal-related offices of the U.S. Geological Survey, Office of Surface Mining, and the Bureau of Land Management is available from the USGS.The 41-page publication, a cooperative effort of the three Department of the Interior agencies, contains a statement of each of the bureaus' functions and activities and a listing by state of selected headquarters offices and field offices.

  19. 78 FR 71592 - National Coal Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy, Office of Fossil Energy..., notice is hereby given that the National Coal Council (NCC) will be renewed for a two-year period. The... matters relating to coal issues. Additionally, the renewal of the National Coal Council has been...

  20. 30 CFR 941.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 941.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  1. 30 CFR 921.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 921.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  2. 30 CFR 933.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 933.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  3. 30 CFR 941.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 941.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  4. 30 CFR 939.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 939.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  5. 30 CFR 910.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 910.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  6. 30 CFR 937.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 937.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  7. 30 CFR 933.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 933.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  8. 30 CFR 921.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 921.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  9. 30 CFR 941.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 941.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  10. 30 CFR 942.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 942.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  11. 30 CFR 922.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 922.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  12. 30 CFR 941.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 941.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  13. 30 CFR 937.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 937.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  14. 30 CFR 912.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 912.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  15. 30 CFR 947.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 947.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  16. 30 CFR 937.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 937.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  17. 30 CFR 939.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 939.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  18. 30 CFR 947.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 947.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  19. 30 CFR 947.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 947.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  20. 30 CFR 910.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 910.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  1. 30 CFR 921.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 921.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  2. 30 CFR 947.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 947.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  3. 30 CFR 933.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 933.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  4. 30 CFR 921.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 921.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  5. 30 CFR 910.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 910.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  6. 30 CFR 922.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 922.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  7. 30 CFR 939.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 939.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  8. 30 CFR 910.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 910.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  9. 30 CFR 941.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 941.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  10. 30 CFR 939.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 939.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  11. 30 CFR 922.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 922.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  12. 30 CFR 942.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 942.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  13. 30 CFR 942.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 942.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  14. 30 CFR 912.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 912.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  15. 30 CFR 912.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 912.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  16. 30 CFR 922.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 922.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  17. 30 CFR 922.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 922.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  18. 30 CFR 942.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 942.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  19. 30 CFR 942.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 942.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  20. 30 CFR 921.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 921.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  1. 30 CFR 910.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 910.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  2. 30 CFR 933.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 933.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  3. 30 CFR 937.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 937.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  4. 30 CFR 947.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Requirements for coal exploration. 947.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  5. 30 CFR 939.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 939.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  6. 30 CFR 937.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Requirements for coal exploration. 937.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  7. 30 CFR 933.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Requirements for coal exploration. 933.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  8. 30 CFR 912.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Requirements for coal exploration. 912.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  9. 30 CFR 912.772 - Requirements for coal exploration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Requirements for coal exploration. 912.772... Requirements for coal exploration. (a) Part 772 of this chapter, Requirements for Coal Exploration, shall apply to any person who conducts or seeks to conduct coal exploration operations. (b) The Office shall make...

  10. 30 CFR 825.2 - Special bituminous coal mines in Wyoming.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Special bituminous coal mines in Wyoming. 825.2 Section 825.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... BITUMINOUS COAL MINES IN WYOMING § 825.2 Special bituminous coal mines in Wyoming. Special bituminous coal...

  11. 30 CFR 825.2 - Special bituminous coal mines in Wyoming.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Special bituminous coal mines in Wyoming. 825.2 Section 825.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... BITUMINOUS COAL MINES IN WYOMING § 825.2 Special bituminous coal mines in Wyoming. Special bituminous coal...

  12. 30 CFR 870.19 - How to calculate excess moisture in HIGH-rank coals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coals. 870.19 Section 870.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.19 How to calculate excess moisture in HIGH-rank coals. Here are the requirements for calculating the excess moisture in high-rank coals for a calendar quarter. ASTM standards...

  13. 30 CFR 870.19 - How to calculate excess moisture in HIGH-rank coals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coals. 870.19 Section 870.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.19 How to calculate excess moisture in HIGH-rank coals. Here are the requirements for calculating the excess moisture in high-rank coals for a calendar quarter. ASTM standards...

  14. 30 CFR 825.2 - Special bituminous coal mines in Wyoming.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Special bituminous coal mines in Wyoming. 825.2 Section 825.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... BITUMINOUS COAL MINES IN WYOMING § 825.2 Special bituminous coal mines in Wyoming. Special bituminous coal...

  15. 30 CFR 825.2 - Special bituminous coal mines in Wyoming.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Special bituminous coal mines in Wyoming. 825.2 Section 825.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... BITUMINOUS COAL MINES IN WYOMING § 825.2 Special bituminous coal mines in Wyoming. Special bituminous coal...

  16. 30 CFR 825.2 - Special bituminous coal mines in Wyoming.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Special bituminous coal mines in Wyoming. 825.2 Section 825.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... BITUMINOUS COAL MINES IN WYOMING § 825.2 Special bituminous coal mines in Wyoming. Special bituminous coal...

  17. 76 FR 74049 - National Coal Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-30

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Office of Fossil Energy, Department of Energy..., notice is hereby given that the National Coal Council will be renewed for a two-year period beginning... general policy matters relating to coal issues. Additionally, the renewal of the Council has been...

  18. 30 CFR 870.20 - How to calculate excess moisture in LOW-rank coals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coals. 870.20 Section 870.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.20 How to calculate excess moisture in LOW-rank coals. Here are the requirements for calculating the excess moisture in low-rank coals for a calendar quarter. ASTM standards D2234...

  19. 78 FR 76319 - Notice of Invitation-Coal Exploration License Application MTM 106757, Montana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ...] Notice of Invitation--Coal Exploration License Application MTM 106757, Montana AGENCY: Bureau of Land... Signal Peak Energy, LLC on a pro rata cost sharing basis in a program for the exploration of coal... Office coal Web site at http://www.blm.gov/mt/st/en/prog/energy/coal.html . A written notice to...

  20. 30 CFR 870.20 - How to calculate excess moisture in LOW-rank coals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... coals. 870.20 Section 870.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.20 How to calculate excess moisture in LOW-rank coals. Here are the requirements for calculating the excess moisture in low-rank coals for a calendar quarter. ASTM standards D2234...

  1. 30 CFR 772.12 - Permit requirements for exploration that will remove more than 250 tons of coal or that will...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mining operations. 772.12 Section 772.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... unsuitable for surface coal mining operations. (a) Exploration permit. Any person who intends to conduct coal...

  2. 48 CFR 908.7110 - Coal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  3. 48 CFR 908.7110 - Coal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  4. 48 CFR 908.7110 - Coal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  5. 48 CFR 908.7110 - Coal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  6. 76 FR 30881 - Federal and Indian Coal Valuation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... No. ONRR-2011-0004] RIN 1012-AA00 Federal and Indian Coal Valuation AGENCY: Office of Natural... interested public before proposing changes to the existing regulations governing the valuation of coal produced from Federal and Indian leases, for royalty purposes. The existing Federal and Indian coal...

  7. 48 CFR 908.7110 - Coal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Coal. 908.7110 Section 908... REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7110 Coal. DOE offices and authorized contractors may participate in the Defense Fuel Supply Center (DFSC) coal contracting program for...

  8. Regional Differences in Demand for Coal as A Basis for Development of A Product Distribution Model for Mining Companies in the Individual Customers Segment

    NASA Astrophysics Data System (ADS)

    Magda, Roman; Bogacz, Paweł; Franik, Tadeusz; Celej, Maciej; Migza, Marcin

    2014-10-01

    The article presents a proposal of methodology based on the process of relationship marketing, serving to determine the level of demand for coal in the individual customer segment, as well as fuel distribution model for this customer group in Poland developed on the basis of this methodology. It also includes selected results of tests carried out using the proposed methods. These proposals have been defined on the basis of market capacity indicators, which can be determined for the district level based on data from the Polish Central Statistical Office. The study also included the use of linear programming, based on the cost of coal logistics, data concerning railway, road and storage infrastructure present on the Polish market and taking into account the legal aspects. The presented results may provide a basis for mining companies to develop a system of coal distribution management in the locations with the highest demand values.

  9. 20 CFR 725.401 - Claims development-general.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Claims development-general. 725.401 Section 725.401 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL... Claims development—general. After a claim has been received by the district director, the district...

  10. 20 CFR 718.203 - Establishing relationship of pneumoconiosis to coal mine employment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... to coal mine employment. 718.203 Section 718.203 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED STANDARDS FOR DETERMINING COAL MINERS' TOTAL DISABILITY OR DEATH DUE TO PNEUMOCONIOSIS Determining Entitlement to Benefits...

  11. 20 CFR 718.203 - Establishing relationship of pneumoconiosis to coal mine employment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... to coal mine employment. 718.203 Section 718.203 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED STANDARDS FOR DETERMINING COAL MINERS' TOTAL DISABILITY OR DEATH DUE TO PNEUMOCONIOSIS Determining Entitlement to Benefits...

  12. 30 CFR 77.1000-1 - Filing of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Ground..., with the MSHA Coal Mine Safety and Health district office for the district in which the mine is located...

  13. 75 FR 6087 - A Comprehensive Federal Strategy on Carbon Capture and Storage

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... the Office of Science and Technology Policy[, and] the Chair of the Council on Environmental Quality... pollution. Rapid commercial development and deployment of clean coal technologies, particularly carbon... development of safe, affordable, and broadly deployable CCS technologies. We have made the largest Government...

  14. 30 CFR 701.4 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the... mining and reclamation operations, approval of coal exploration which substantially disturbs the natural...

  15. 30 CFR 905.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface coal mining operations. 905.764 Section 905.764 Mineral Resources OFFICE OF SURFACE MINING... WITHIN EACH STATE CALIFORNIA § 905.764 Process for designating areas unsuitable for surface coal mining operations. Part 764 of this chapter, State Processes for Designating Areas Unsuitable for Surface Coal...

  16. 75 FR 51488 - Division of Coal Mine Workers' Compensation; Proposed Extension of Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers...). SUPPLEMENTARY INFORMATION: I. Background: The Division of Coal Mine Workers' Compensation administers the Black Lung Benefits Act (30 U.S.C. 901 et seq.), which provides benefits to coal miners totally disabled due...

  17. 78 FR 45566 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Coal Mine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... for OMB Review; Comment Request; Coal Mine Dust Sampling Devices ACTION: Notice. SUMMARY: The... information collection request (ICR) titled, ``Coal Mine Dust Sampling Devices,'' to the Office of Management...) determine the concentration of respirable dust in coal mines. CPDMs must be designed and constructed for...

  18. 30 CFR 910.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface coal mining operations. 910.764 Section 910.764 Mineral Resources OFFICE OF SURFACE MINING... WITHIN EACH STATE GEORGIA § 910.764 Process for designating areas unsuitable for surface coal mining operations. Part 764 of this chapter, State Processes for Designating Areas Unsuitable for Surface Coal...

  19. 76 FR 10070 - Division of Coal Mine Workers' Compensation; Proposed Extension of Existing Collection; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers... Rereading (CM-933b), Medical History and Examination for Coal Mine Workers' Pneumoconiosis (CM-988), Report... interpretation of x-rays. When a miner applies for benefits, the Division of Coal Mine Workers' Compensation...

  20. 78 FR 72717 - Division of Coal Mine Workers' Compensation; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers... proposed collection: Comparability of Current Work to Coal Mine Employment (CM-913). A copy of the proposed...., provides for the payment of benefits to coal miners who are totally disabled by black lung disease arising...

  1. 30 CFR 912.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface coal mining operations. 912.764 Section 912.764 Mineral Resources OFFICE OF SURFACE MINING... WITHIN EACH STATE IDAHO § 912.764 Process for designating areas unsuitable for surface coal mining operations. Part 764 of this chapter, State Processes for Designating Areas Unsuitable for Surface Coal...

  2. 78 FR 2424 - Notice of Competitive Coal Lease Sale, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ...-LVEMJ12CJ610, UTU89060] Notice of Competitive Coal Lease Sale, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of competitive coal lease sale. SUMMARY: Notice is hereby given that the United States Department of the Interior, Bureau of Land Management (BLM), Utah State Office will reoffer certain coal...

  3. 30 CFR 903.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface coal mining operations. 903.764 Section 903.764 Mineral Resources OFFICE OF SURFACE MINING... WITHIN EACH STATE ARIZONA § 903.764 Process for designating areas unsuitable for surface coal mining operations. Part 764 of this chapter, State Processes for Designating Areas Unsuitable for Surface Coal...

  4. 30 CFR 870.19 - How to calculate excess moisture in HIGH-rank coals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html... coals. 870.19 Section 870.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.19 How to calculate excess moisture in HIGH-rank coals. Here are the...

  5. 30 CFR 870.20 - How to calculate excess moisture in LOW-rank coals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .../code_of_federal_regulations/ibr_locations.html. (a)(1) Calculate the excess moisture percentage using... coals. 870.20 Section 870.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.20 How to calculate excess moisture in LOW-rank coals. Here are the...

  6. 30 CFR 870.19 - How to calculate excess moisture in HIGH-rank coals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html... coals. 870.19 Section 870.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.19 How to calculate excess moisture in HIGH-rank coals. Here are the...

  7. 30 CFR 870.20 - How to calculate excess moisture in LOW-rank coals.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .../code_of_federal_regulations/ibr_locations.html. (a)(1) Calculate the excess moisture percentage using... coals. 870.20 Section 870.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.20 How to calculate excess moisture in LOW-rank coals. Here are the...

  8. 30 CFR 870.20 - How to calculate excess moisture in LOW-rank coals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .../code_of_federal_regulations/ibr_locations.html. (a)(1) Calculate the excess moisture percentage using... coals. 870.20 Section 870.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.20 How to calculate excess moisture in LOW-rank coals. Here are the...

  9. 30 CFR 762.15 - Exploration on land designated as unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of surface coal mining operations pursuant to section 522 of the Act and regulations of this... for surface coal mining operations. 762.15 Section 762.15 Mineral Resources OFFICE OF SURFACE MINING... AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS § 762.15 Exploration on land designated as...

  10. 30 CFR 762.15 - Exploration on land designated as unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of surface coal mining operations pursuant to section 522 of the Act and regulations of this... for surface coal mining operations. 762.15 Section 762.15 Mineral Resources OFFICE OF SURFACE MINING... AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS § 762.15 Exploration on land designated as...

  11. 30 CFR 762.15 - Exploration on land designated as unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of surface coal mining operations pursuant to section 522 of the Act and regulations of this... for surface coal mining operations. 762.15 Section 762.15 Mineral Resources OFFICE OF SURFACE MINING... AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS § 762.15 Exploration on land designated as...

  12. 30 CFR 870.19 - How to calculate excess moisture in HIGH-rank coals.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html... coals. 870.19 Section 870.19 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... COAL PRODUCTION REPORTING § 870.19 How to calculate excess moisture in HIGH-rank coals. Here are the...

  13. 30 CFR 762.15 - Exploration on land designated as unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of surface coal mining operations pursuant to section 522 of the Act and regulations of this... for surface coal mining operations. 762.15 Section 762.15 Mineral Resources OFFICE OF SURFACE MINING... AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS § 762.15 Exploration on land designated as...

  14. 30 CFR 762.15 - Exploration on land designated as unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of surface coal mining operations pursuant to section 522 of the Act and regulations of this... for surface coal mining operations. 762.15 Section 762.15 Mineral Resources OFFICE OF SURFACE MINING... AREAS AS UNSUITABLE FOR SURFACE COAL MINING OPERATIONS § 762.15 Exploration on land designated as...

  15. Emissions from Coal Fires and Their Impact on the Environment

    USGS Publications Warehouse

    Kolker, Allan; Engle, Mark; Stracher, Glenn; Hower, James; Prakash, Anupma; Radke, Lawrence; ter Schure, Arnout; Heffern, Ed

    2009-01-01

    Self-ignited, naturally occurring coal fires and fires resulting from human activities persist for decades in underground coal mines, coal waste piles, and unmined coal beds. These uncontrolled coal fires occur in all coal-bearing parts of the world (Stracher, 2007) and pose multiple threats to the global environment because they emit greenhouse gases - carbon dioxide (CO2), and methane (CH4) - as well as mercury (Hg), carbon monoxide (CO), and other toxic substances (fig. 1). The contribution of coal fires to the global pool of atmospheric CO2 is little known but potentially significant. For China, the world's largest coal producer, it is estimated that anywhere between 10 million and 200 million metric tons (Mt) of coal reserves (about 0.5 to 10 percent of production) is consumed annually by coal fires or made inaccessible owing to fires that hinder mining operations (Rosema and others, 1999; Voigt and others, 2004). At this proportion of production, coal amounts lost to coal fires worldwide would be two to three times that for China. Assuming this coal has mercury concentrations similar to those in U.S. coals, a preliminary estimate of annual Hg emissions from coal fires worldwide is comparable in magnitude to the 48 tons of annual Hg emissions from all U.S. coal-fired power-generating stations combined (U.S. Environmental Protection Agency, 2002). In the United States, the combined cost of coal-fire remediation projects, completed, budgeted, or projected by the U.S. Department of the Interior's Office of Surface Mining Reclamation and Enforcement (OSM), exceeds $1 billion, with about 90% of that in two States - Pennsylvania and West Virginia (Office of Surface Mining Enforcement and Reclamation, 2008; fig. 2). Altogether, 15 States have combined cumulative OSM coal-fire project costs exceeding $1 million, with the greatest overall expense occurring in States where underground coal fires are predominant over surface fires, reflecting the greater cost of extinguishing underground fires (fig. 2) (see 'Controlling Coal Fires'). In this fact sheet we review how coal fires occur, how they can be detected by airborne and remote surveys, and, most importantly, the impact coal-fire emissions may have on the environment and human health. In addition, we describe recent efforts by the U.S. Geological Survey (USGS) and collaborators to measure fluxes of CO2, CO, CH4, and Hg, using groundbased portable detectors, and combining these approaches with airborne thermal imaging and CO2 measurements. The goal of this research is to develop approaches that can be extrapolated to large fires and to extrapolate results for individual fires in order to estimate the contribution of coal fires as a category of global emissions.

  16. 20 CFR 726.104 - Action by the Office upon application of operator.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Action by the Office upon application of operator. 726.104 Section 726.104 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization...

  17. 20 CFR 726.6 - The Office of Workers' Compensation Programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false The Office of Workers' Compensation Programs. 726.6 Section 726.6 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE General § 726.6 The...

  18. 20 CFR 726.309 - Referral to the Office of Administrative Law Judges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Referral to the Office of Administrative Law Judges. 726.309 Section 726.309 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Civil Money...

  19. 75 FR 63864 - Division of Coal Mine Workers' Compensation; Proposed Extension of Existing Collection; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers... comments concerning the proposed collection: Comparability of Current Work to Coal Mine Employment (CM-913... Benefits Act of 1977, as amended, 30 U.S.C. 901 et seq., provides for the payment of benefits to coal...

  20. 77 FR 51827 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Ground...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... for OMB Review; Comment Request; Ground Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Mine Safety... Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines,'' to the Office of...

  1. 30 CFR 773.14 - Eligibility for provisionally issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 773.14 Section 773.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... surface coal mining and reclamation operation with— (1) A notice of violation issued under § 843.12 of...

  2. 78 FR 39008 - Renewal of Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... enables the BLM to manage Federal coal resources in accordance with applicable statutes. The Office of...: This collection enables the BLM to learn the extent and qualities of Federal coal resources; evaluate... lessees to acquire and hold Federal coal leases; and ensure lessee compliance with applicable statutes...

  3. 20 CFR 726.2 - Purpose and scope of this part.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 726.2 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR... and controlling the circumstances under which a coal mine operator shall fulfill his insurance...

  4. 20 CFR 726.2 - Purpose and scope of this part.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 726.2 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR... and controlling the circumstances under which a coal mine operator shall fulfill his insurance...

  5. 20 CFR 726.2 - Purpose and scope of this part.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 726.2 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR... and controlling the circumstances under which a coal mine operator shall fulfill his insurance...

  6. 77 FR 59667 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Respirable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... for OMB Review; Comment Request; Respirable Coal Mine Dust Sampling ACTION: Notice. SUMMARY: The... information collection request (ICR) titled, ``Respirable Coal Mine Dust Sampling,'' to the Office of... operator to protect miners from exposure to excessive dust levels. The respirable coal mine dust sampling...

  7. 30 CFR 732.15 - Criteria for approval or disapproval of State programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs. 732.15 Section 732.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... laws and regulations pertaining to coal exploration and surface coal mining and reclamation operations... system consistent with the regulations of subchapter G of this chapter and prohibit surface coal mining...

  8. 77 FR 59415 - Renewal of Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... regarding leases of solid minerals other than coal and oil shale. The Office of Management and Budget (OMB... Than Coal and Oil Shale (43 CFR Parts 3500, 3580, and 3590). OMB Control Number: 1004-0121. Abstract... solid minerals other than coal or oil shale. The information activities currently approved under control...

  9. 78 FR 6831 - Renewal of Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... leases of solid minerals other than coal and oil shale. The Office of Management and Budget (OMB... information collection: Title: Leasing of Solid Minerals Other Than Coal and Oil Shale (43 CFR Parts 3500... other legal requirements relating to the leasing of solid minerals other than coal or oil shale; Gather...

  10. 78 FR 6829 - Agency Information Collection Activities: Submitted for Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... information related to coal, coal bed gas, shale gas and other energy resources and related information..., coal bed gas, and other solid fuel occurrences. Requesting external cooperation is the best way for... organic-rich shale, and obtain other information (including geophysical or seismic data, sample collection...

  11. 78 FR 45972 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Coal Mines ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Mine Safety and... Continuous Mining Machines Standards for Underground Coal Mines,'' to the Office of Management and Budget... continuous mining machines (HVCMM) in underground coal mines by requiring records of testing, examination and...

  12. 30 CFR 72.710 - Selection, fit, use, and maintenance of approved respirators.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .../code_of_federal_regulations/ibr_locations.html. This incorporation by reference was approved by the..., DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH HEALTH STANDARDS FOR COAL MINES Miscellaneous § 72.710...; http://www.ansi.org, and may be inspected at any MSHA Coal Mine Safety and Health district office, or...

  13. 30 CFR 72.710 - Selection, fit, use, and maintenance of approved respirators.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .../code_of_federal_regulations/ibr_locations.html. This incorporation by reference was approved by the..., DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH HEALTH STANDARDS FOR COAL MINES Miscellaneous § 72.710...; http://www.ansi.org, and may be inspected at any MSHA Coal Mine Safety and Health district office, or...

  14. 30 CFR 72.710 - Selection, fit, use, and maintenance of approved respirators.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .../code_of_federal_regulations/ibr_locations.html. This incorporation by reference was approved by the..., DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH HEALTH STANDARDS FOR COAL MINES Miscellaneous § 72.710...; http://www.ansi.org, and may be inspected at any MSHA Coal Mine Safety and Health district office, or...

  15. 30 CFR 937.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 937.707 Section 937.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  16. 30 CFR 903.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 903.707 Section 903.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, applies to surface coal mining and...

  17. 30 CFR 921.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Government-financed highway or other construction. 921.707 Section 921.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  18. 30 CFR 942.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 942.707 Section 942.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  19. 30 CFR 939.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Government-financed highway or other construction. 939.707 Section 939.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  20. 30 CFR 937.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 937.707 Section 937.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  1. 30 CFR 947.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 947.707 Section 947.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  2. 30 CFR 922.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 922.707 Section 922.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  3. 30 CFR 922.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 922.707 Section 922.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  4. 30 CFR 933.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 933.707 Section 933.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  5. 30 CFR 910.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 910.707 Section 910.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incidental to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  6. 30 CFR 942.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 942.707 Section 942.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  7. 30 CFR 939.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Government-financed highway or other construction. 939.707 Section 939.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  8. 30 CFR 912.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government-financed highway or other construction. 912.707 Section 912.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  9. 30 CFR 912.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Government-financed highway or other construction. 912.707 Section 912.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  10. 30 CFR 939.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government-financed highway or other construction. 939.707 Section 939.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  11. 30 CFR 912.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Government-financed highway or other construction. 912.707 Section 912.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  12. 30 CFR 933.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 933.707 Section 933.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  13. 30 CFR 910.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 910.707 Section 910.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incidental to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  14. 30 CFR 905.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 905.707 Section 905.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  15. 30 CFR 922.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 922.707 Section 922.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  16. 30 CFR 905.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 905.707 Section 905.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  17. 30 CFR 905.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 905.707 Section 905.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  18. 30 CFR 921.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Government-financed highway or other construction. 921.707 Section 921.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  19. 30 CFR 947.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 947.707 Section 947.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  20. 30 CFR 939.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Government-financed highway or other construction. 939.707 Section 939.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  1. 30 CFR 947.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 947.707 Section 947.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  2. 30 CFR 905.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 905.707 Section 905.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  3. 30 CFR 942.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 942.707 Section 942.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  4. 30 CFR 903.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 903.707 Section 903.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, applies to surface coal mining and...

  5. 30 CFR 941.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government-financed highway or other construction. 941.707 Section 941.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  6. 30 CFR 933.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 933.707 Section 933.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  7. 30 CFR 905.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 905.707 Section 905.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  8. 30 CFR 910.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 910.707 Section 910.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incidental to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  9. 30 CFR 941.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Government-financed highway or other construction. 941.707 Section 941.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  10. 30 CFR 903.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 903.707 Section 903.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, applies to surface coal mining and...

  11. 30 CFR 939.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Government-financed highway or other construction. 939.707 Section 939.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  12. 30 CFR 937.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 937.707 Section 937.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  13. 30 CFR 910.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... government-financed highway or other construction. 910.707 Section 910.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incidental to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  14. 30 CFR 933.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 933.707 Section 933.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  15. 30 CFR 941.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Government-financed highway or other construction. 941.707 Section 941.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  16. 30 CFR 910.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 910.707 Section 910.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incidental to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  17. 30 CFR 903.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 903.707 Section 903.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, applies to surface coal mining and...

  18. 30 CFR 941.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Government-financed highway or other construction. 941.707 Section 941.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  19. 30 CFR 922.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 922.707 Section 922.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  20. 30 CFR 933.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 933.707 Section 933.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  1. 30 CFR 937.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 937.707 Section 937.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  2. 30 CFR 912.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Government-financed highway or other construction. 912.707 Section 912.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  3. 30 CFR 942.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 942.707 Section 942.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  4. 30 CFR 903.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 903.707 Section 903.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, applies to surface coal mining and...

  5. 30 CFR 941.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Government-financed highway or other construction. 941.707 Section 941.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  6. 30 CFR 921.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Government-financed highway or other construction. 921.707 Section 921.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  7. 30 CFR 942.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government-financed highway or other construction. 942.707 Section 942.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  8. 30 CFR 947.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... government-financed highway or other construction. 947.707 Section 947.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  9. 30 CFR 921.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Government-financed highway or other construction. 921.707 Section 921.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  10. 30 CFR 921.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Government-financed highway or other construction. 921.707 Section 921.707 Mineral Resources OFFICE OF... Government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  11. 30 CFR 922.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 922.707 Section 922.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  12. 30 CFR 947.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... government-financed highway or other construction. 947.707 Section 947.707 Mineral Resources OFFICE OF... government-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and...

  13. 30 CFR 937.707 - Exemption for coal extraction incident to government-financed highway or other construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... government-financed highway or other construction. 937.707 Section 937.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  14. 30 CFR 912.707 - Exemption for coal extraction incident to Government-financed highway or other construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Government-financed highway or other construction. 912.707 Section 912.707 Mineral Resources OFFICE OF...-financed highway or other construction. Part 707 of this chapter, Exemption for Coal Extraction Incident to Government-Financed Highway or Other Construction, shall apply to surface coal mining and reclamation...

  15. 76 FR 10896 - Science Advisory Board Staff Office; Request for Nominations; CASAC Mercury Review Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... the emissions of hazardous air pollutants (HAPs) released from coal-burning electric generating units...-based standard for reducing HAP emissions. EPA is developing a draft risk assessment for mercury, entitled Technical Support Document: National- Scale Mercury Risk Assessment. This draft assessment...

  16. 30 CFR 761.14 - Procedures for relocating or closing a public road or waiving the prohibition on surface coal...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... road or waiving the prohibition on surface coal mining operations within the buffer zone of a public road. 761.14 Section 761.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... Procedures for relocating or closing a public road or waiving the prohibition on surface coal mining...

  17. 75 FR 439 - Notice of Invitation To Participate; Exploration for Coal in New Mexico; License NMNM 123298

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ...] Notice of Invitation To Participate; Exploration for Coal in New Mexico; License NMNM 123298 AGENCY... Coal Company, or the Bureau of Land Management, New Mexico State Office, Solid Minerals Adjudication, P.O. Box 27115, Santa Fe, New Mexico 87502-0115. Any parties electing to participate in this...

  18. 30 CFR 937.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 937.702 Section 937.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  19. 30 CFR 922.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 922.702 Section 922.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  20. 30 CFR 903.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 903.702 Section 903.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  1. 30 CFR 921.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 921.702 Section 921.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of the chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  2. 30 CFR 941.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 941.702 Section 941.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  3. 30 CFR 947.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 947.702 Section 947.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  4. 30 CFR 905.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 905.702 Section 905.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  5. 30 CFR 912.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 912.702 Section 912.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  6. 30 CFR 942.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 942.702 Section 942.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  7. 30 CFR 939.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 939.702 Section 939.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  8. 30 CFR 933.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 933.702 Section 933.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... other minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of...

  9. 30 CFR 910.702 - Exemption for coal extraction incidental to the extraction of other minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Exemption for coal extraction incidental to the extraction of other minerals. 910.702 Section 910.702 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION... minerals. Part 702 of this chapter, Exemption for Coal Extraction Incidental to the Extraction of Other...

  10. 30 CFR 701.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... program implementation; (2) Subchapter D on surface coal mining and reclamation operations on Federal lands; (3) Subchapter E on surface coal mining and reclamation operations on Indian lands. (4...

  11. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Emmanuel

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controlsmore » can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key findings and research suggestions discussed at the event. Discussions at the workshop will aid DOE in developing a set of distinct initiatives that can be pursued by government and industry to realize promising technological pursuits. DOE plans to use the results of the Dialogue coupled with ongoing technical analysis of efficiency opportunities within the coal-fired fleet, and additional studies to develop a comprehensive strategy for capitalizing on thermal efficiency improvements. Expected Power Plant Efficiency Improvements include developing cost-effective, efficient, and reliable technologies for boilers, turbines, and sensors and controls to improve the reliability and efficiency of existing coal-based power plants. The Office of Fossil Energy at DOE plans to work with industry to develop knowledge pertaining to advanced technologies and systems that industry can subsequently develop. These technologies and systems will increase reliability, add operational flexibility and improve efficiency, thereby providing more robust power generation infrastructure. The following table lists the research suggestions and questions for further investigation that were identified by participants in each session of the dialogue.« less

  12. Proceedings of Office of Surface Mining Coal Combustion By-product Government/Regulatory Panel: University of Kentucky international ash utilization symposium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vories, K.C.

    2003-07-01

    Short papers are given on: the Coal Combustion Program (C2P2) (J. Glenn); regional environmental concerns with disposal of coal combustion wastes at mines (T. FitzGerald); power plant waste mine filling - an environmental perspective (L.G. Evans); utility industry perspective regarding coal combustion product management and regulation (J. Roewer); coal combustion products opportunities for beneficial use (D.C. Goss); state perspective on mine placement of coal combustion by-products (G.E. Conrad); Texas regulations provide for beneficial use of coal combustion ash (S.S. Ferguson); and the Surface Mining Control and Reclamation Act - a response to concerns about placement of CCBs at coal minemore » sites (K.C. Vories). The questions and answers are also included.« less

  13. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT REGULATORY... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation...

  14. 30 CFR 775.13 - Judicial review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS... to judicial review by a court of competent jurisdiction, as provided for in the State program, but...

  15. 30 CFR 740.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS... surface coal mining operations on Federal lands. Persons intending to conduct such operations must respond...

  16. 30 CFR 740.10 - Information collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS... surface coal mining operations on Federal lands. Persons intending to conduct such operations must respond...

  17. The use of ethanol to remove sulfur from coal. Final report, September 1991--December 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-15

    In developing the new Ohio University procedure the thermodynamic limitations of the reactions for removal of both pyritic and organic sulfur from coal at 400--600{degrees}C were studied using copper as a very strong H{sub 2}S-acceptor. Copper serves as a catalyst for ethanol dehydrogenation to form nascent hydrogen. Copper also serves as a scavenger to form copper sulfide from the hydrogen sulfide evolved during the reaction. Copper sulfide in turn serves as a catalyst for organic sulfur hydrodesulfurization reactions. If the coal to be desulfurized contains pyrite (FeS{sub 2}) or FeS, the copper scavenger effect reduces any back reaction of hydrogenmore » sulfide with the iron and increases the removal of sulfur from the carbonaceous material. The desired effect of using copper can be achieved by using copper or copper containing alloys as materials of construction or as liners for a regenerable reactor. During the time period that Ohio Coal Development Office supported this work, small scale (560 grams) laboratory experiments with coals containing about 3.5% sulfur have achieved up to 90% desulfurization at temperatures of 500{degrees}C when using a copper reactor. Results from the autoclave experiments have identified the nature of the chemical reactions taking place. Because the process removes both pyritic and organic sulfur in coal, the successful scale up of the process would have important economic significance to the coal industry. Even though this and other chemical processes may be relatively expensive and far from being commercial, the reason for further development is that this process may hold the promise of achieving much greater sulfur reduction and of producing a cleaner coal than other methods. This would be especially important for small or older power plants and industrial boilers.« less

  18. 30 CFR 740.11 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... jurisdiction. (e) This subchapter shall not apply to surface coal mining and reclamation operations within a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.11...

  19. 30 CFR 900.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE INTRODUCTION § 900.4 Responsibilities. (a) Each State that has surface coal mining and reclamation operations or coal exploration activities on non...

  20. 30 CFR 800.14 - Determination of bond amount.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 800.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR BONDING AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.14...

  1. 20 CFR 726.106 - Type of security.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S... regulations governing bonding companies (see Department of Treasury's Circular—570). (c) An applicant for...

  2. 30 CFR 785.13 - Experimental practices mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Experimental practices mining. 785.13 Section 785.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  3. PRIMARY PARTICLES GENERATED BY THE COMBUSTION OF HEAVY FUEL OIL AND COAL: REVIEW OF RESEARCH RESULTS FROM EPA'S NATIONAL RISK MANAGEMENT RESEARCH LABORATORY

    EPA Science Inventory

    Researchers at the U.S. Environmental Protection Agency's (EPA's) Office of Research and
    Development (ORD) have conducted a series of tests to characterize the size and composition of primary particulate matter (PM) generated from the combustion of heavy fuel oil and pulverize...

  4. 48 CFR 816.504 - Indefinite-quantity contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... issue a solicitation for estimated quantities, the contracting officer shall insert the clause at 852.216-70, Estimated quantities. (b) The contracting officer shall insert the Alternate I clause at 852.216-70 in solicitations for bulk coal. (c) The contracting officer shall insert the Alternate II...

  5. 30 CFR 715.11 - General obligations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INITIAL... surface coal mining and reclamation operations conducted on lands where any element of the operations is... are established by part 716 of this chapter for— (1) Surface coal mining operations on steep slopes...

  6. 30 CFR 736.22 - Contents of a Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 736.22 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., the Director shall— (1) Consider the nature of that State's soils, topography, climate, and biological... of coal exploration and surface coal mining and reclamation operations more stringent than those...

  7. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  8. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  9. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  10. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  11. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  12. 30 CFR 785.15 - Steep slope mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Steep slope mining. 785.15 Section 785.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS...

  13. 30 CFR 785.15 - Steep slope mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Steep slope mining. 785.15 Section 785.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS...

  14. Back to the FutureGen?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchsbaum, L.

    2009-04-15

    After years of political wrangling, Democrats may green-light the experimental clean coal power plants. The article relates how the project came to be curtailed, how Senator Dick Durbin managed to protect $134 million in funding for FutureGen in Mattoon, and how once Obama was in office a $2 billion line item to fund a 'near zero emissions power plant(s)' was placed in the Senate version of the Stimulus Bill. The final version of the legislation cut the funding to $1 billion for 'fossil energy research and development'. In December 2008 the FutureGen Alliance and the City of Mattoon spent $6.5more » billion to purchase the plants eventual 440 acre site. A report by the Government Accountability Office (GAO) said that Bush's inaction may have set back clean coal technology in the US by as much as a decade. If additional funding comes through construction of the plant could start in 2010. 1 fig., 1 photo.« less

  15. 75 FR 21351 - Division of Coal Mine Workers' Compensation; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers' Compensation; Proposed Collection; Comment Request ACTION: Notice. SUMMARY: The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation...

  16. 75 FR 11912 - Division of Coal Mine Workers' Compensation; Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers' Compensation; Proposed Collection; Comment Request ACTION: Notice. SUMMARY: The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation...

  17. 30 CFR 740.15 - Bonds on Federal lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS... surface coal mining, the applicant for a mining permit, if unable to obtain the written consent of the...

  18. 43 CFR 2203.0-9 - Cross references.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Fee Federal Coal Deposits § 2203.0-9 Cross references. The authorized officer shall implement a fee exchange of Federal coal deposits in compliance with the requirements of subparts 2200 and 2201 on this...-9 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT...

  19. 43 CFR 2203.0-9 - Cross references.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Fee Federal Coal Deposits § 2203.0-9 Cross references. The authorized officer shall implement a fee exchange of Federal coal deposits in compliance with the requirements of subparts 2200 and 2201 on this...-9 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT...

  20. 43 CFR 2203.0-9 - Cross references.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Fee Federal Coal Deposits § 2203.0-9 Cross references. The authorized officer shall implement a fee exchange of Federal coal deposits in compliance with the requirements of subparts 2200 and 2201 on this...-9 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT...

  1. 43 CFR 2203.0-9 - Cross references.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Fee Federal Coal Deposits § 2203.0-9 Cross references. The authorized officer shall implement a fee exchange of Federal coal deposits in compliance with the requirements of subparts 2200 and 2201 on this...-9 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT...

  2. 30 CFR 777.17 - Permit fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Permit fees. 777.17 Section 777.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.17 Permit fees. An application for a surface coal...

  3. 30 CFR 777.17 - Permit fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Permit fees. 777.17 Section 777.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.17 Permit fees. An application for a surface coal...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Valery, N.

    The calorific values of the fuels being studied were compared. Petrol is the most efficient, followed by methane in the form of LGN, then methanol and liquid hydrogen. Hydrogen is attractive only on a weight basis, but the storage problems are serious for its liquefied state. Liquid methane requires the same costly storage equipment as hydrogen, making it prohibitive for road vehicles. Methanol is a clean burning fuel and manufacturing processes are being developed. Tests are being sponsored by the Office of Coal Research and the American Gas Association and large-scale commercial plants could be capable of being onstream bymore » 1978. Synthetic crude oil has been manufactured in Sasol, South Africa since 1955. The technique is based on the Fischer-Tropsch process for synthesizing oil from coal, not only making synthetic petrol from coal but also the full range of products normally derived from crude oil. (MCW)« less

  5. 77 FR 1513 - Division of Coal Mine Workers' Compensation; Proposed Renewal of Existing Collection; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers' Compensation; Proposed Renewal of Existing Collection; Comment Request ACTION: Notice. SUMMARY: The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre...

  6. 75 FR 51487 - Division of Coal Mine Workers' Compensation; Proposed Extension of Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... DEPARTMENT OF LABOR Office of Workers' Compensation Programs Division of Coal Mine Workers' Compensation; Proposed Extension of Information Collection; Comment Request ACTION: Notice. SUMMARY: The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a...

  7. 30 CFR 774.12 - Post-permit issuance information requirements for permittees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for permittees. 774.12 Section 774.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... competent jurisdiction grants a stay of the cessation order and the stay remains in effect. (c) Within 60...

  8. 30 CFR 730.12 - Requirements for regulatory programs in States.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 730.12 Section 730.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... each State in which coal exploration and surface coal mining and reclamation operations are or may be... the issuance of an injunction by any court of competent jurisdiction shall not result in the...

  9. 30 CFR 874.13 - Reclamation objectives and priorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 874.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE..., safety, and property from extreme danger of adverse effects of coal mining practices, including the... effects of coal mining practices; and (ii) Are adjacent to a site that has been or will be addressed to...

  10. 30 CFR 777.11 - Format and contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Format and contents. 777.11 Section 777.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT...

  11. 30 CFR 732.17 - State program amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... the number or size of coal exploration or surface coal mining and reclamation operations in the State... amendment(s) is being reviewed by the Director and will include the following: (i) The text or a summary of...

  12. 30 CFR 745.13 - Authority reserved by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11... Section 745.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... surface coal mining under subchapter F of this chapter or terminate such designations; (b) Comply with the...

  13. 30 CFR 745.13 - Authority reserved by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11... Section 745.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... surface coal mining under subchapter F of this chapter or terminate such designations; (b) Comply with the...

  14. 30 CFR 745.13 - Authority reserved by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11... Section 745.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... surface coal mining under subchapter F of this chapter or terminate such designations; (b) Comply with the...

  15. 30 CFR 745.13 - Authority reserved by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11... Section 745.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... surface coal mining under subchapter F of this chapter or terminate such designations; (b) Comply with the...

  16. 30 CFR 745.13 - Authority reserved by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with surface coal mining operations on Federal lands within a national forest, as specified in § 761.11... Section 745.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE... surface coal mining under subchapter F of this chapter or terminate such designations; (b) Comply with the...

  17. 30 CFR 921.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... surface coal mining operations. 921.764 Section 921.764 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS... mining operations. Part 764 of this chapter, State Processes for Designating Areas Unsuitable for Surface...

  18. 30 CFR 933.764 - Process for designating areas unsuitable for surface coal mining operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... surface coal mining operations. 933.764 Section 933.764 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS... mining operations. Part 764 of this chapter, State Processes for Designatng Areas Unsuitable for Surface...

  19. 30 CFR 707.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... For purposes of this part, only that coal extracted from within the right-of-way, in the case of a... construction. Extraction of coal outside the right-of-way or boundary of the area directly affected by the... or office of the unit which, directly or through another unit of government, finances construction...

  20. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  1. 78 FR 38357 - Notice of Availability of the Environmental Assessment and Notice of Public Hearing for the Bowie...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ...In accordance with Federal coal management regulations, the Bowie Resources, LLC, Federal Coal Lease-By-Application (LBA) Environmental Assessment (EA) is available for public review and comment. The Bureau of Land Management (BLM) Colorado State Office will hold a public hearing to receive comments on the EA, Fair Market Value (FMV), and Maximum Economic Recovery (MER) of the coal resources for Bowie Resources, LLC, serial number COC-75916.

  2. 75 FR 15456 - Notice of Availability for the Signal Peak Energy, LLC, Federal Coal Lease Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... James M. Sparks, Manager, Billings Field Office, 5001 Southgate Drive, Billings, Montana 59101-4669... CONTACT: Craig Drake, Assistant Manager, Billings Field Office, 5001 Southgate Drive, Billings, Montana... Application MTM 97988. DATES: The public hearing will be held in the BLM Montana State Office's main...

  3. 30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...

  4. 20 CFR 726.315 - Contents.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Contents. 726.315 Section 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Civil Money Penalties § 726.315 Contents. Any...

  5. 20 CFR 726.315 - Contents.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Contents. 726.315 Section 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Civil Money Penalties § 726.315 Contents. Any...

  6. 20 CFR 726.315 - Contents.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false Contents. 726.315 Section 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Civil Money Penalties § 726.315 Contents. Any...

  7. 30 CFR 730.11 - Inconsistent and more stringent State laws and regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations. 730.11 Section 730.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... Register setting forth the text or a summary of any State law or regulation initially determined by him to... stringent land use and environmental controls and regulations of coal exploration and surface coal mining...

  8. 76 FR 30938 - The Effects of Mountaintop Mines and Valley Fills on Aquatic Ecosystems of the Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... scientific reports assessing the environmental and water quality effects of mountaintop coal mining on Appalachian streams. Both reports, prepared by EPA scientists in the Agency's Office of Research and... responsible for the review of surface coal mining operations under the Clean Water Act. The two reports...

  9. 30 CFR 773.6 - Public participation in permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Information that pertains only to the analysis of the chemical and physical properties of the coal to be mined... operation, including the U.S. Department of Agriculture Soil Conservation Service district office, the local... pertaining to coal seams, test borings, core samplings, or soil samples in an application shall be made...

  10. 30 CFR 773.6 - Public participation in permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Information that pertains only to the analysis of the chemical and physical properties of the coal to be mined... operation, including the U.S. Department of Agriculture Soil Conservation Service district office, the local... pertaining to coal seams, test borings, core samplings, or soil samples in an application shall be made...

  11. 30 CFR 933.761 - Areas designated unsuitable for surface coal mining by Act of Congress.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., forest, recreation area, or places; (f)(1) Where the proposed surface coal mining operation may adversely... mining by Act of Congress. 933.761 Section 933.761 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS...

  12. 30 CFR 933.761 - Areas designated unsuitable for surface coal mining by Act of Congress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., forest, recreation area, or places; (f)(1) Where the proposed surface coal mining operation may adversely... mining by Act of Congress. 933.761 Section 933.761 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS...

  13. 30 CFR 933.761 - Areas designated unsuitable for surface coal mining by Act of Congress.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., forest, recreation area, or places; (f)(1) Where the proposed surface coal mining operation may adversely... mining by Act of Congress. 933.761 Section 933.761 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS...

  14. 30 CFR 933.761 - Areas designated unsuitable for surface coal mining by Act of Congress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., forest, recreation area, or places; (f)(1) Where the proposed surface coal mining operation may adversely... mining by Act of Congress. 933.761 Section 933.761 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS...

  15. 20 CFR 726.115 - Revocation of authorization to self-insure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization of Self-Insurers § 726.115 Revocation of authorization to... regulations in this part, or with any lawful order or communication of the Office, or the failure or...

  16. 43 CFR 2203.1 - Opportunity for public comment and public meeting on exchange proposal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) EXCHANGES: GENERAL PROCEDURES Exchanges Involving Fee Federal Coal Deposits § 2203.1 Opportunity for public... Federal coal deposits, the authorized officer shall publish and distribute a notice of exchange proposal... meeting on exchange proposal. 2203.1 Section 2203.1 Public Lands: Interior Regulations Relating to Public...

  17. 20 CFR 726.115 - Revocation of authorization to self-insure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization of Self-Insurers § 726.115 Revocation of authorization to... regulations in this part, or with any lawful order or communication of the Office, or the failure or...

  18. 43 CFR 2203.1 - Opportunity for public comment and public meeting on exchange proposal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) EXCHANGES: GENERAL PROCEDURES Exchanges Involving Fee Federal Coal Deposits § 2203.1 Opportunity for public... Federal coal deposits, the authorized officer shall publish and distribute a notice of exchange proposal... meeting on exchange proposal. 2203.1 Section 2203.1 Public Lands: Interior Regulations Relating to Public...

  19. 20 CFR 726.103 - Application for authority to self-insure; effect of regulations contained in this part.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...; effect of regulations contained in this part. 726.103 Section 726.103 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization of Self...

  20. 20 CFR 726.103 - Application for authority to self-insure; effect of regulations contained in this part.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; effect of regulations contained in this part. 726.103 Section 726.103 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization of Self...

  1. 20 CFR 726.103 - Application for authority to self-insure; effect of regulations contained in this part.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; effect of regulations contained in this part. 726.103 Section 726.103 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization of Self...

  2. 43 CFR 2203.1 - Opportunity for public comment and public meeting on exchange proposal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) EXCHANGES: GENERAL PROCEDURES Exchanges Involving Fee Federal Coal Deposits § 2203.1 Opportunity for public... Federal coal deposits, the authorized officer shall publish and distribute a notice of exchange proposal... meeting on exchange proposal. 2203.1 Section 2203.1 Public Lands: Interior Regulations Relating to Public...

  3. 43 CFR 2203.1 - Opportunity for public comment and public meeting on exchange proposal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) EXCHANGES: GENERAL PROCEDURES Exchanges Involving Fee Federal Coal Deposits § 2203.1 Opportunity for public... Federal coal deposits, the authorized officer shall publish and distribute a notice of exchange proposal... meeting on exchange proposal. 2203.1 Section 2203.1 Public Lands: Interior Regulations Relating to Public...

  4. 77 FR 67024 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... procedures and requirements for terminating jurisdiction of surface coal mining and reclamation operations... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice...

  5. 75 FR 32812 - Notice of Invitation To Participate; Coal Exploration License Application WYW179006, Wyoming

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... License. SUMMARY: Pursuant to the Mineral Leasing Act of 1920, as amended by the Federal Coal Leasing..., Wyoming. DATES: This notice of invitation was published in the Rock Springs Daily Rocket-Miner once each... 82003; and, Bureau of Land Management, Rock Springs Field Office, 280 Highway 191 North, Rock Springs...

  6. 30 CFR 933.761 - Areas designated unsuitable for surface coal mining by Act of Congress.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mining by Act of Congress. 933.761 Section 933.761 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.761 Areas designated unsuitable for surface coal mining by Act of...

  7. 76 FR 50754 - Notice of Invitation To Participate; Coal Exploration License Application NMNM-124051, New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ...] Notice of Invitation To Participate; Coal Exploration License Application NMNM-124051, New Mexico AGENCY... States of America in lands located in San Juan County, New Mexico. DATES: This notice of invitation will....m. to 4 p.m., Monday through Friday: BLM, New Mexico State Office, 301 Dinosaur Trail, Santa Fe, New...

  8. 77 FR 35058 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... for OMB Review; Comment Request; Pilot Surveys of Employee Voice in the Coal Mining Industry ACTION... the Coal Mining Industry,'' to the Office of Management and Budget (OMB) for review and approval for...' voice in mining workplaces under the jurisdiction of the MSHA. The DOL working definition for voice in...

  9. Steam Turbine Materials for Ultrasupercritical Coal Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viswanathan, R.; Hawk, J.; Schwant, R.

    The Ultrasupercritical (USC) Steam Turbine Materials Development Program is sponsored and funded by the U.S. Department of Energy and the Ohio Coal Development Office, through grants to Energy Industries of Ohio (EIO), a non-profit organization contracted to manage and direct the project. The program is co-funded by the General Electric Company, Alstom Power, Siemens Power Generation (formerly Siemens Westinghouse), and the Electric Power Research Institute, each organization having subcontracted with EIO and contributing teams of personnel to perform the requisite research. The program is focused on identifying, evaluating, and qualifying advanced alloys for utilization in coal-fired power plants that needmore » to withstand steam turbine operating conditions up to 760°C (1400°F) and 35 MPa (5000 psi). For these conditions, components exposed to the highest temperatures and stresses will need to be constructed from nickel-based alloys with higher elevated temperature strength than the highchromium ferritic steels currently used in today's high-temperature steam turbines. In addition to the strength requirements, these alloys must also be weldable and resistant to environmental effects such as steam oxidation and solid particle erosion. In the present project, candidate materials with the required creep strength at desired temperatures have been identified. Coatings that can resist oxidation and solid particle erosion have also been identified. The ability to perform dissimilar welds between nickel base alloys and ferritic steels have been demonstrated, and the properties of the welds have been evaluated. Results of this three-year study that was completed in 2009 are described in this final report. Additional work is being planned and will commence in 2009. The specific objectives of the future studies will include conducting more detailed evaluations of the weld-ability, mechanical properties and repair-ability of the selected candidate alloys for rotors, casings and valves, and to perform scale-up studies to establish a design basis for commercial scale components. A supplemental program funded by the Ohio Coal Development Office will undertake supporting tasks such as testing and trials using existing atmospheric, vacuum and developmental pressure furnaces to define specific metal casting techniques needed for producing commercial scale components.« less

  10. 30 CFR 773.26 - How to challenge an ownership or control listing or finding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... authority with jurisdiction over the violation and the AVS Office to obtain additional information. (d) A... investigation by the AVS Office. (e) At any time, you, a person listed in AVS as an owner or controller of a surface coal mining operation, may request an informal explanation from the AVS Office as to the reason...

  11. Recent regulatory experience of low-Btu coal gasification. Volume III. Supporting case studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ackerman, E.; Hart, D.; Lethi, M.

    The MITRE Corporation conducted a five-month study for the Office of Resource Applications in the Department of Energy on the regulatory requirements of low-Btu coal gasification. During this study, MITRE interviewed representatives of five current low-Btu coal gasification projects and regulatory agencies in five states. From these interviews, MITRE has sought the experience of current low-Btu coal gasification users in order to recommend actions to improve the regulatory process. This report is the third of three volumes. It contains the results of interviews conducted for each of the case studies. Volume 1 of the report contains the analysis of themore » case studies and recommendations to potential industrial users of low-Btu coal gasification. Volume 2 contains recommendations to regulatory agencies.« less

  12. In Brief: Coal mining regulations

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2009-12-01

    The U.S. Department of the Interior (DOI) announced on 18 November measures to strengthen the oversight of state surface coal mining programs and to promulgate federal regulations to protect streams affected by surface coal mining operations. DOI's Office of Surface Mining Reclamation and Enforcement (OSM) is publishing an advance notice of a proposed rule about protecting streams from adverse impacts of surface coal mining operations. A rule issued by the Bush administration in December 2008 allows coal mine operators to place excess excavated materials into streams if they can show it is not reasonably possible to avoid doing so. “We are moving as quickly as possible under the law to gather public input for a new rule, based on sound science, that will govern how companies handle fill removed from mountaintop coal seams,” according to Wilma Lewis, assistant secretary for Land and Minerals Management at DOI.

  13. Coal resources in environmentally-sensitive lands under federal management

    USGS Publications Warehouse

    Watson, William D.; Tully, John K.; Moser, Edward N.; Dee, David P.; Bryant, Karen; Schall, Richard; Allan, Harold A.

    1995-01-01

    This report presents estimates of coal-bearing acreage and coal tonnage in environmentally-sensitive areas. The analysis was conducted to provide data for rulemaking by the Federal Office of Surface Mining (Watson and others, 1995). The rulemaking clarifies conditions under which coal can be mined in environmentally-sensitive areas. The area of the U.S. is about 2.3 billion acres. Contained within that acreage are certain environmentally-sensitive and unique areas (including parks, forests, and various other Federal land preserves). These areas are afforded special protection under Federal and State law. Altogether these protected areas occupy about 400 million acres. This report assesses coal acreage and coal tonnage in these protected Federal land preserves. Results are presented in the form of 8 map-displays prepared using GIS methods at a national scale. Tables and charts that accompany each map provide estimates of the total acreage in Federal land preserve units that overlap or fall within coal fields, coal-bearing acreage in each unit, and coal tonnage in each unit. Summary charts, compiled from the maps, indicate that about 8% of the Nation's coal reserves are located within environmentally-sensitive Federal land preserves.

  14. 78 FR 55760 - Proposed Extension of Existing Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-11

    ...). SUPPLEMENTARY INFORMATION: I. Background The Division of Coal Mine Workers' Compensation administers the Black... order to carry out its responsibility to administer the Black Lung Benefits Act. Agency: Office of... become a matter of public record. Dated: September 5, 2013. Yoon Ferguson, Agency Clearance Officer...

  15. 43 CFR 4.1383 - Hearing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Hearing. 4.1383 Section 4.1383 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Review of Office of Surface Mining...

  16. 43 CFR 4.1383 - Hearing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Hearing. 4.1383 Section 4.1383 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Review of Office of Surface Mining...

  17. 78 FR 54879 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Capability Under the Powerplant and Industrial Fuel Use Act AGENCY: Office Electricity Delivery and Energy... the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR... requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or...

  18. 20 CFR 410.563 - Liability of a certifying officer.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Liability of a certifying officer. 410.563 Section 410.563 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, TITLE IV-BLACK LUNG BENEFITS (1969- ) Payment of Benefits § 410.563 Liability of a...

  19. 10 CFR 501.11 - Address for filing documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Address for filing documents. 501.11 Section 501.11 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS ADMINISTRATIVE PROCEDURES AND SANCTIONS General Provisions... communications to the following address: Office of Fossil Energy, Office of Fuels Programs, Coal and Electricity...

  20. 43 CFR 4.1116 - Status of notices of violation and orders of cessation pending review by the Office of Hearings...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Status of notices of violation and orders of cessation pending review by the Office of Hearings and Appeals. 4.1116 Section 4.1116 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining...

  1. 20 CFR 410.563 - Liability of a certifying officer.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Liability of a certifying officer. 410.563 Section 410.563 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT...(b) of the Social Security Act; or (b) Where adjustment under section 204(a) of the Social Security...

  2. 78 FR 64397 - Mississippi Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... text of the program amendment available at www.regulations.gov . A. Mississippi Surface Coal Mining... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 924...; S2D2SSS08011000SX066A00033F13XS501520] Mississippi Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement...

  3. Defense Energy Information System (DEIS): DEIS-80 Design System Specification. Revision A.

    DTIC Science & Technology

    1981-07-01

    and consumption of petroleum products such as aviation gasoline, jet fuels, motor gasolines, distillate, and residual oil within DoD. DEIS I software...water, fuel oil , coal, solar/thermal power, and wind power. This subsystem also reports environmental data such as degree days during a reporting period...Petroleum Oil and Lubricants Officer, the Fuels Officer, the Supply Of- ficer, or the Engineering Officer on the base or facility consolidate in

  4. 76 FR 60532 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Miner's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Employment History ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Office of Workers... Benefits Under the Black Lung Benefits Act and Employment History,'' to the Office of Management and Budget..., complete the Employment History (Form CM-911a) to list the coal miner's work history. This information...

  5. 20 CFR 726.109 - Increase or reduction in the amount of security.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR... Office may require. The Office may reduce the amount of security at any time on its own initiative, or upon the application of a self-insurer, when it believes the facts warrant a reduction. A self-insurer...

  6. 30 CFR 778.8 - Information collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... intending to conduct surface coal mining operations must respond to obtain a benefit. A Federal agency may... Enforcement, Information Collection Clearance Officer, Room 202-SIB, 1951 Constitution Avenue, NW., Washington...

  7. Description and evaluation of the information transfer workshop series "Coal hydrology in Virginia"

    USGS Publications Warehouse

    Hufschmidt, Peter W.

    1984-01-01

    A series of workshops was conducted in September, 1982, by staff of the Virginia Office, Mid-Atlantic District of the U.S.-Geological Survey for the benefit of coal operators, consultants, and resource managers in the coal-producing area of southwest Virginia. The purpose of the workshop series was to present hydrologic information and data by the U.S. Geological Survey collected during four years of study of the. coal hydrology of Virginia. The workshop series was held one day a week for three weeks at two locations within southwest Virginia in order to reduce travel time and overnight travel costs for participants. Results of an independently conducted questionnaire indicate the series was a success. The report summarizes the workshop preparation, organization, and presentation, and gives general conclusions and suggestions for those interested in conducting workshops.

  8. Pacific Northwest Laboratory annual report for 1983 to the DOE Office of Energy Research. Part 1. Biomedical sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drucker, H.

    1983-02-01

    Biomedical and health effects research conducted at PNL in 1982 on the evaluation of risk to man from existing and/or developing energy-related technologies are described. Most of the studies described in this report relate to activities for three major energy technologies: nuclear fuel cycle; fossil fuel cycle (oil, gas, and coal process technologies, mining, and utilization; synfuel development), and fudion (biomagnetic effects). The report is organized under these technologies. In addition, research reports are included on the application of nuclear energy to biomedical problems. Individual projects are indexed separately.

  9. Coal-fired boiler houses in Cracow present state and possibilities to improve their efficiency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cyklis, P.; Butcher, T.A.

    1995-12-31

    A significant amount of heat energy both for heating and process purposes is generated in Cracow, Poland in small-and medium size local boiler houses. The operating procedure of these boiler houses is most often economically and ecologically ineffective because of the bad condition of boilers and lack of funds to install automation, control and measurement equipment. Within the Polish-American Program of Elimination of Low Emission Sources financed by the US Department of Energy, the ENERGOEKSPERT Co., Ltd. investigated chosen boiler houses in Cracow, commissioned by the Cracow Development Office. The results of these investigations were subject of engineering analysis carriedmore » out at the Institute of Industrial Equipment and Power Engineering, Technical University, Cracow. The analysis proved that the low-cost improvement of economic efficiency and reduction of air pollutant emission is feasible for combustion of coal fuels.« less

  10. Comprehensive evaluation on low-carbon development of coal enterprise groups.

    PubMed

    Wang, Bang-Jun; Wu, Yan-Fang; Zhao, Jia-Lu

    2017-12-19

    Scientifically evaluating the level of low-carbon development in terms of theoretical and practical significance is extremely important to coal enterprise groups for implementing national energy-related systems. This assessment can assist in building institutional mechanisms that are conducive for the economic development of coal business cycle and energy conservation as well as promoting the healthy development of coal enterprises to realize coal scientific development and resource utilization. First, by adopting systematic analysis method, this study builds low-carbon development evaluation index system for coal enterprise groups. Second, to determine the weight serving as guideline and criteria of the index, analytic hierarchy process (AHP) is applied using integrated linear weighted sum method to evaluate the level of low-carbon development of coal enterprise groups. Evaluation is also performed by coal enterprise groups, and the process comprises field analysis and evaluation. Finally, industrial policies are proposed regarding the development of low-carbon coal conglomerate strategies and measures. This study aims mainly to guide the low-carbon development of coal enterprise groups, solve the problem of coal mining and the destruction of ecological environment, support the conservation of raw materials and various resources, and achieve the sustainable development of the coal industry.

  11. Applicability of NSPS for Coal Preparation to Coal Unloading Operations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Research Policy in the Federal Republic of Germany.

    DTIC Science & Technology

    1980-12-16

    particularly for coal use, flue gas decontamination (particularly for desulfurization ), sewage treatment, biological pest control , and artificial fertilizers...NAME AND AODRESS 10. PROGRAM ELEMENT. PROJECT. TASK AREA 8 WORK UNIT NUMBERS 11. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE 16 December 198 0...34 1" NUMSER-OF PAGES 14. MONITORING AGENCY NAME & ADDRESS(If different fromt Controlling Office) 15. SECURITY CLASS. (o this repol) Unclassified

  13. 20 CFR 725.421 - Referral of a claim to the Office of Administrative Law Judges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Referral of a claim to the Office of Administrative Law Judges. 725.421 Section 725.421 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C OF TITLE IV OF THE FEDERAL MINE...

  14. Direct liquefaction proof-of-concept facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred G. Comolli; Peizheng Zhou; HTI Staff

    2000-01-01

    The main objective of the U.S. DOE, Office of Fossil Energy, is to ensure the US a secure energy supply at an affordable price. An integral part of this program was the demonstration of fully developed coal liquefaction processes that could be implemented if market and supply considerations so required, Demonstration of the technology, even if not commercialized, provides a security factor for the country if it is known that the coal to liquid processes are proven and readily available. Direct liquefaction breaks down and rearranges complex hydrocarbon molecules from coal, adds hydrogen, and cracks the large molecules to thosemore » in the fuel range, removes hetero-atoms and gives the liquids characteristics comparable to petroleum derived fuels. The current processes being scaled and demonstrated are based on two reactor stages that increase conversion efficiency and improve quality by providing the flexibility to adjust process conditions to accommodate favorable reactions. The first stage conditions promote hydrogenation and some oxygen, sulfur and nitrogen removal. The second stage hydrocracks and speeds the conversion to liquids while removing the remaining sulfur and nitrogen. A third hydrotreatment stage can be used to upgrade the liquids to clean specification fuels.« less

  15. Two-step rapid sulfur capture. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-04-01

    The primary goal of this program was to test the technical and economic feasibility of a novel dry sorbent injection process called the Two-Step Rapid Sulfur Capture process for several advanced coal utilization systems. The Two-Step Rapid Sulfur Capture process consists of limestone activation in a high temperature auxiliary burner for short times followed by sorbent quenching in a lower temperature sulfur containing coal combustion gas. The Two-Step Rapid Sulfur Capture process is based on the Non-Equilibrium Sulfur Capture process developed by the Energy Technology Office of Textron Defense Systems (ETO/TDS). Based on the Non-Equilibrium Sulfur Capture studies the rangemore » of conditions for optimum sorbent activation were thought to be: activation temperature > 2,200 K for activation times in the range of 10--30 ms. Therefore, the aim of the Two-Step process is to create a very active sorbent (under conditions similar to the bomb reactor) and complete the sulfur reaction under thermodynamically favorable conditions. A flow facility was designed and assembled to simulate the temperature, time, stoichiometry, and sulfur gas concentration prevalent in the advanced coal utilization systems such as gasifiers, fluidized bed combustors, mixed-metal oxide desulfurization systems, diesel engines, and gas turbines.« less

  16. JEDI Coal Model | Jobs and Economic Development Impact Models | NREL

    Science.gov Websites

    Coal Model JEDI Coal Model The Jobs and Economic Development Impacts (JEDI) Coal Model allow users to estimate economic development impacts from coal projects and includes default information that can

  17. 76 FR 54291 - Notice of Rail Energy Transportation Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ..., particularly, but not necessarily limited to, coal, ethanol, and other biofuels. The purpose of this meeting is..., a review and discussion of ethanol issues, a roundtable discussion, and election of new officers...

  18. Environmental issues of synthetic transportation fuels from coal

    DOT National Transportation Integrated Search

    1982-11-01

    This report, Background paper #3, contains papers written for Office of Technology Assessment to assist in preparation of the report, Increased Automobile Fuel Efficiency and Synthetic Fuels: Alternatives for Reducing Oil Imports. Environmental impac...

  19. Crew Earth Observations (CEO) taken during Expedition Six

    NASA Image and Video Library

    2003-02-01

    ISS006-E-28028 (February 2003) --- The Southern Cross (left center), the Coal Sack Nebula (bottom left), and the Carina Nebula (upper right) are visible in this view photographed by astronaut Donald R. Pettit, Expedition Six NASA ISS science officer, on board the International Space Station (ISS). The Carina Nebula is a molecular cloud about 9000 light years from Earth where young stars are forming. The Coal Sack Nebula is an inky-black dust cloud about 2000 light years from Earth. Stars are probably condensing deep inside the Coal Sack, but their light has not yet broken through the cloud’s dense exterior. The Southern Cross, also known as The Crux, is a constellation familiar to southern hemisphere stargazers.

  20. New EPA Guidelines for Review of Surface Coal Mining Operations in Appalachia (released in AEO2010)

    EIA Publications

    2010-01-01

    On April 1, 2010, the Environmental Protection Agency (EPA) issued a set of new guidelines to several of its Regional offices regarding the compliance of surface coal mining operations in Appalachia with the provisions of the Clean Water Act (CWA), the National Environmental Policy Act, and the environmental justice Executive Order (E.O. 12898). The stated purpose of the guidance was to explain more fully the approach that the EPA will be following in permit reviews, and to provide additional assurance that its Regional offices use clear, consistent, and science-based standards in reviewing the permits. Although the new guidelines go into effect immediately, they will be subjected to review both by the public and by the EPA's Science Advisory Board, with a set of final guidelines to be issued no later than April 1, 2011.

  1. EPA office of solid waste (OSW) report to Congress

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Derkics, D.

    1996-12-31

    An EPA Office of Solid Waste Report to Congress is presented in outline form. The following topics are discussed: special waste chronology; statutory hazardous waste exemption; 1988 report to Congress findings; 1993 regulatory determination; current (1996), regulatory status of fossil fuel combustion wastes; co-management study; Electric Power Research Institute (EPRI) activities; EPRI coal ash field study sites; oil ash total combustion; fossil fuel combustion; current EPA activities; and Federal Register Notice.

  2. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  3. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  4. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  5. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  6. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  7. 77 FR 32665 - Notice of Invitation To Participate; Coal Exploration License Application WYW180763, Wyoming

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ..., Gillette, Wyoming 82717, and BLM, Wyoming State Office, Branch of Solid Minerals, Attn: Mavis Love, P.O. Box 1828, Cheyenne, Wyoming 82003. FOR FURTHER INFORMATION CONTACT: Mavis Love, Land Law Examiner, at...

  8. The Clean Air Act Amendments of 1990: Hazardous Air Pollutant Requirements and the DOE Clean Coal Technology Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moskowitz, P.D.; DePhillips, M.; Fthenakis, V.M.

    1991-12-31

    The purpose of the US Department of Energy -- Office of Fossil Energy (DOE FE) Clean Coal Technology Program (CCTP) is to provide the US energy marketplace with advanced, efficient, and environmentally sound coal-based technologies. The design, construction, and operation of Clean Coal Technology Demonstration Projects (CCTDP) will generate data needed to make informed, confident decisions on the commercial readiness of these technologies. These data also will provide information needed to ensure a proactive response by DOE and its industrial partners to the establishment of new regulations or a reactive response to existing regulations promulgated by the US Environmental Protectionmore » Agency (EPA). The objectives of this paper are to: (1) Present a preliminary examination of the potential implications of the Clean Air Act Amendments (CAAA) -- Title 3 Hazardous Air Pollutant requirements to the commercialization of CCTDP; and (2) help define options available to DOE and its industrial partners to respond to this newly enacted Legislation.« less

  9. The Clean Air Act Amendments of 1990: Hazardous Air Pollutant Requirements and the DOE Clean Coal Technology Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moskowitz, P.D.; DePhillips, M.; Fthenakis, V.M.

    1991-01-01

    The purpose of the US Department of Energy -- Office of Fossil Energy (DOE FE) Clean Coal Technology Program (CCTP) is to provide the US energy marketplace with advanced, efficient, and environmentally sound coal-based technologies. The design, construction, and operation of Clean Coal Technology Demonstration Projects (CCTDP) will generate data needed to make informed, confident decisions on the commercial readiness of these technologies. These data also will provide information needed to ensure a proactive response by DOE and its industrial partners to the establishment of new regulations or a reactive response to existing regulations promulgated by the US Environmental Protectionmore » Agency (EPA). The objectives of this paper are to: (1) Present a preliminary examination of the potential implications of the Clean Air Act Amendments (CAAA) -- Title 3 Hazardous Air Pollutant requirements to the commercialization of CCTDP; and (2) help define options available to DOE and its industrial partners to respond to this newly enacted Legislation.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marrocco, M.

    The Ohio Power Company`s Tidd Pressurized Fluidized Bed Combined Cycle (PFBC) program continues to be the only operating PFBC demonstration program in the nation. The 70 MWe Tidd Demonstration Plant is a Round 1 Clean Coal Technology Project constructed to demonstrate the viability of PFBC combined cycle technology. The plant is now in Rs fourth year of operation. The technology has clearly demonstrated Rs ability to achieve sulfur capture of greater than 95%. The calcium to sulfur molar ratios have been demonstrated to exceed original projections. Unit availability has steadily increased and has been demonstrated to be competitive with othermore » technologies. The operating experience of the first forty-four months of testing has moved the PFBC process from a {open_quotes}promising technology{close_quotes} to available, proven option for efficient, environmentally acceptable base load generation. Funding for the $210 million program is provided by Ohio Power Company, The U.S. Department of Energy, The Ohio Coal Development Office, and the PFBC process vendors - Asea Brown Boveri Carbon (ABBC) and Babcock and Wilcox (B&W).« less

  11. VIEW OF FORMER WINDBER ELECTRIC COMPANY BUILDING, BUILT 1925, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF FORMER WINDBER ELECTRIC COMPANY BUILDING, BUILT 1925, LOOKING NORTH, LOCATED ON THE NORTH SIDE OF 15TH STREET, NOW BERWIND-WILMORE DIVISION OFFICES AND REITZ COAL COMPANY - Windber Electric Building, 509 Fifteenth Street, Windber, Somerset County, PA

  12. 30 CFR 779.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Scope. 779.1 Section 779.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND... environmental resources contents of applications for surface mining activities. ...

  13. 30 CFR 779.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope. 779.1 Section 779.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND... environmental resources contents of applications for surface mining activities. ...

  14. 30 CFR 1206.252 - Information collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Information collection. 1206.252 Section 1206.252 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE PRODUCT VALUATION Federal Coal § 1206.252 Information collection. The information...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The coal industry, the utilities, and the state government are planning for development of high-energy coal gasification in Illinois to convert its abundant high-sulfur coal supply to a substitute natural gas. Following a summary of the findings, the following topics are discussed briefly: Illinois coal and the push for coal gasification; coal gasification: a look at the process; potential sites for an Illinois coal gasification industry; the impact of coal gasification's water requirements; solid wastes from coal gasification; land losses: the impact on agriculture; potential human health problems with coal gasification; the energy efficiency of coal gasification; potential economic impactsmore » of coal gasification; the corporations behind high-energy coal gasification; state involvement: legalizing the losses of the people; the national energy picture: the impact of western coal developments on Illinois; action: what you can do now. 27 references. (MCW)« less

  16. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutledge, G.; Lane, D.; Edblom, G.

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distancemore » transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)« less

  17. Determining the Ambient Air Boundary for Potential Permit Application in Support of Alaska Industrial Development and Export Authority's Restart of Healy Clean Coal Project

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. 30 CFR 795.12 - Applicant liability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.12 Applicant... 12 months immediately following the date on which the operator is issued the surface coal mining and...

  19. 77 FR 50686 - Notice of Approval of Title V Operating Permit for Peabody Western Coal Company (Navajo Nation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... Street, San Francisco, CA 94105. To arrange for viewing of these documents call Roger Kohn at (415) 972-3973. FOR FURTHER INFORMATION CONTACT: Roger Kohn, Air Division Permits Office, U.S. Environmental...

  20. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4 Responsibilities. (a) The Secretary is responsible for: (1) Approval, disapproval or conditional approval of mining...

  1. 30 CFR 735.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... encourage the States to assume jurisdiction over the regulation of surface coal mining and reclamation... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Objectives. 735.2 Section 735.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT...

  2. 30 CFR 705.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL RESTRICTION ON FINANCIAL INTERESTS OF STATE EMPLOYEES § 705.5 Definitions. Act. Means the Surface Mining Control and Reclamation Act of 1977, Pub. L. 95-87. Coal mining operation. Means the business of...

  3. 30 CFR 745.12 - Terms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations on Federal lands; and (2) Where lands containing leased Federal coal are involved, provide OSM, in... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM STATE-FEDERAL COOPERATIVE AGREEMENTS § 745.12 Terms. Each cooperative agreement shall include: (a) Terms...

  4. 30 CFR 745.12 - Terms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations on Federal lands; and (2) Where lands containing leased Federal coal are involved, provide OSM, in... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM STATE-FEDERAL COOPERATIVE AGREEMENTS § 745.12 Terms. Each cooperative agreement shall include: (a) Terms...

  5. 30 CFR 745.12 - Terms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations on Federal lands; and (2) Where lands containing leased Federal coal are involved, provide OSM, in... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM STATE-FEDERAL COOPERATIVE AGREEMENTS § 745.12 Terms. Each cooperative agreement shall include: (a) Terms...

  6. 30 CFR 745.12 - Terms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations on Federal lands; and (2) Where lands containing leased Federal coal are involved, provide OSM, in... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM STATE-FEDERAL COOPERATIVE AGREEMENTS § 745.12 Terms. Each cooperative agreement shall include: (a) Terms...

  7. 30 CFR 1202.250 - Overriding royalty interest.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Overriding royalty interest. 1202.250 Section 1202.250 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE ROYALTIES Coal § 1202.250 Overriding royalty interest. The regulations governing...

  8. 30 CFR 1202.250 - Overriding royalty interest.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Overriding royalty interest. 1202.250 Section 1202.250 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE ROYALTIES Coal § 1202.250 Overriding royalty interest. The regulations governing...

  9. 30 CFR 1202.250 - Overriding royalty interest.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Overriding royalty interest. 1202.250 Section 1202.250 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE ROYALTIES Coal § 1202.250 Overriding royalty interest. The regulations governing...

  10. 30 CFR 1206.252 - Information collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Information collection. 1206.252 Section 1206... Natural Resources Revenue PRODUCT VALUATION Federal Coal § 1206.252 Information collection. The information collection requirements contained in this subpart have been approved by the Office of Management...

  11. Fugitive Emissions From Coal Unloading At Coal Preparation Plant

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Applicability of NSPS for Coal Preparation to Coal Unloading Operations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. Pacific Northwest Laboratory annual report for 1984 to the DOE Office of Energy Research. Part 1. Biomedical sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Felton, D.L.

    1985-02-01

    Research progress is reported in the following areas: (1) evaluation of possible health effects among nuclear workers; (2) dose-effect relationship studies of carcinogenesis from both nuclear materials and complex mixtures; (3) microbial mutagenesis studies with 6-aminochrysene and benzo(a)pyrene in coal-derived complex mixtures; and (4) a variety of studies relating to noncarcinogenic and nonmutagenic endpoints, including teratology, perinatal studies and studies to determine absorption, metabolism, and doses to critical tissues and organs of coal-derived mixtures and radionuclides. Items have been individually abstracted for the data base. (ACR)

  14. Evaluation of coal feed systems being developed by the Energy Research and Development administration

    NASA Technical Reports Server (NTRS)

    Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.

    1977-01-01

    Development criteria and recommendations for coal feed system selections that include supporting data are presented. Considered are the areas of coal feed coasts, coal feed system reliability, and the interaction of the feed system with the conversion process.

  15. 30 CFR 750.13 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 750.13 Section 750.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INDIAN LANDS PROGRAM REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS...

  16. 20 CFR 410.120 - Disclosure of program information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 410.120 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT... any information obtained at any time by the Social Security Administration, or any officer or employee... connection with the administration of the old-age, survivors, disability, or health insurance programs...

  17. 30 CFR 700.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... longer a surface coal mining and reclamation operation and thereby when regulatory jurisdiction may end... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Information collection. 700.10 Section 700.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL...

  18. 30 CFR 921.700 - Massachusetts Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 921.700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.700 Massachusetts Federal program. (a) This part contains all rules that are applicable to surface coal mining...

  19. 48 CFR 816.504 - Indefinite-quantity contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Indefinite-quantity contracts. 816.504 Section 816.504 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS....216-70 in solicitations for bulk coal. (c) The contracting officer shall insert the Alternate II...

  20. 48 CFR 816.504 - Indefinite-quantity contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Indefinite-quantity contracts. 816.504 Section 816.504 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS....216-70 in solicitations for bulk coal. (c) The contracting officer shall insert the Alternate II...

  1. 30 CFR 823.1 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope and purpose. 823.1 Section 823.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM... design standards for surface coal mining and reclamation operations on prime farmland. ...

  2. 30 CFR 783.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope. 783.1 Section 783.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND... for the environmental resources contents of applications for permits for underground mining activities. ...

  3. 30 CFR 777.15 - Completeness.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Completeness. 777.15 Section 777.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.15 Completeness. An application for a permit to conduct...

  4. 30 CFR 777.15 - Completeness.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Completeness. 777.15 Section 777.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL... CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.15 Completeness. An application for a permit to conduct...

  5. 30 CFR 783.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Scope. 783.1 Section 783.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND... for the environmental resources contents of applications for permits for underground mining activities. ...

  6. Royal Society, Discussion on New Coal Chemistry, London, England, May 21, 22, 1980, Proceedings

    NASA Astrophysics Data System (ADS)

    1981-03-01

    A discussion of new coal chemistry is presented. The chemical and physical structure of coal is examined in the first section, including structural studies of coal extracts, metal and metal complexes in coal and coal microporosity. The second section presents new advances in applied coal technology. The development of liquid fuels and chemicals from coal is given especial emphasis, with papers on the Sasol Synthol process, the Shell-Koppers gasification process, liquefaction and gasification in Germany, the Solvent Refined Coal process, the Exxon Donor Solvent liquefaction process and the Mobil Methanol-to-Gasoline process. Finally, some developments that will be part of the future of coal chemistry in the year 2000 are examined in the third section, including coal-based chemical complexes and the use of coal as an alternative source to oil for chemical feedstocks.

  7. 78 FR 28242 - Proposed Information Collection; Cleanup Program for Accumulations of Coal and Float Coal Dusts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... Program for Accumulations of Coal and Float Coal Dusts, Loose Coal, and Other Combustibles AGENCY: Mine... collection for developing and updating a cleanup program for accumulations of coal and float coal dusts, loose coal, and other combustibles in underground coal mines. DATES: All comments must be postmarked or...

  8. Hydrology of area 46, Northern Great Plains and Rocky Mountain coal provinces, North Dakota

    USGS Publications Warehouse

    Croft, M.G.; Crosby, Orlo A.

    1987-01-01

    This report is one of a series that describes the hydrology of coal provinces nationwide. The Northern Great Plains and Rocky Mountain Coal Provinces are divided into 20 separate reporting areas which are numbered 43 to 62. This report provides general hydrologic information for Area 46 using a brief text with accompanying maps, charts, or graphs. This information may be used to describe the hydrology of the general area of any existing or proposed mine. Some of the more obvious hydrologic problems of coal development that will need to be addressed before development are disruption of aquifers and potential contamination of streams, aquifers, and the atmosphere.Area 46 is in northwestern North Dakota and is composed of parts or all of 14 hydrologic units based on surface-water drainage basins. The area is drained by the Missouri and Souris Rivers.Lignite-bearing rocks of late Paleocene age underlie nearly all of Area 46. The thickest and most continuous lignite beds occur in the Sentinel Butte and Tongue River Members of the Fort Union Formation. Alluvial deposits and a veneer of glacial drift of late Pleistocene age overlie the lignite-bearing rocks. The climate of the area is semiarid. Mean annual precipitation ranges from 13.9 to 17.8 inches. Mean annual temperatures range from 37.7°F at Bowbells to 40.9°F at Williston. Mean monthly temperatures at Williston range from 8.3°F to 70°F. The growing season is about 125 days.A fairly comprehensive data base for streamflow and water quality in streams is available for Area 46. Many of the small-stream monitoring sites have been operated during the last few years to provide a data base before coal development. With the exception of the Missouri River, which is controlled by several dams, both the quantity and quality of water varies greatly in all streams. A ground-water observation network for water levels and water quality has been established through county ground-water resource investigations and other ground-water studies and provides an adequate data base. Three activities within the U.S. Geological Survey identify and provide access to hydrologic data. These are the National Water-Data Exchange (NAWDEX), the National Water-Data Storage and Retrieval System (WATSTORE), and the Office of Water-Data Coordination (OWDC).

  9. Preliminary Public Design Report for the Texas Clean Energy Project: Topical Report - Phase 1, June 2010-July 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattes, Karl

    Summit Texas Clean Energy, LLC (Summit) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin sub-bituminous coal delivered by rail from Wyoming into a syntheticmore » gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. Front-end Engineering and Design (FEED) commenced in June 2010 and was completed in July 2011, setting the design basis for entering into the detailed engineering phase of the project. During Phase 1, TCEP conducted and completed the FEED, applied for and received its air construction permit, provided engineering and other technical information required for development of the draft Environmental Impact Statement, and completed contracts for the sale of all of the urea and most of the CO 2. Significant progress was made on the contracts for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine and the sale of electricity to CPS Energy, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site.« less

  10. Characterization of seven United States coal regions. The development of optimal terrace pit coal mining systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wimer, R.L.; Adams, M.A.; Jurich, D.M.

    1981-02-01

    This report characterizes seven United State coal regions in the Northern Great Plains, Rocky Mountain, Interior, and Gulf Coast coal provinces. Descriptions include those of the Fort Union, Powder River, Green River, Four Corners, Lower Missouri, Illinois Basin, and Texas Gulf coal resource regions. The resource characterizations describe geologic, geographic, hydrologic, environmental and climatological conditions of each region, coal ranks and qualities, extent of reserves, reclamation requirements, and current mining activities. The report was compiled as a basis for the development of hypothetical coal mining situations for comparison of conventional and terrace pit surface mining methods, under contract to themore » Department of Energy, Contract No. DE-AC01-79ET10023, entitled The Development of Optimal Terrace Pit Coal Mining Systems.« less

  11. Forecasting of a Thermal Condition of Pneumatic Tires of Dump Trucks

    NASA Astrophysics Data System (ADS)

    Kvasova, Anna; Gerike, Boris; Murko, Elena; Skudarnov, Dmitriy

    2017-11-01

    Over the last 10 years the world consumption of coal has grown almost by 50%. Coal is one of the main energy resources capable to satisfy basic energy demands of increasing population and developing world economy. On January 24, 2012 the long-term Coal Industry Development Program for the period till 2030 was approved in Russia. According to this Program coal mining in Kuzbass in 2030 will make 260 million tonns of coal per year. Development of the coal industry is impossible without upgrade of coal production by avoiding inefficient technological, organizational and economic solutions. Off the road (OTR) tires play an important role in ensuring effective, continuous and safe work of mining motor transport.

  12. 43 CFR 4.1373 - Hearing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Hearing. 4.1373 Section 4.1373 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Review of Osm Decisions Proposing to...

  13. 30 CFR 795.7 - Filing for assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.7 Filing for... each year of the proposed permit. (d) A description of— (1) The proposed method of coal mining; (2) The...

  14. 43 CFR 3481.3 - Confidentiality.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... part or part 3400 of this title shall be open for public inspection and copying during regular office... geologic and geophysical data and maps pertaining to Federal recoverable coal reserves obtained from...)), such as geologic and geophysical data and maps, shall not be available for public inspection or made...

  15. 77 FR 3282 - Agency Information Collection Activities: Proposed Collection; Comments Requested: Federal Coal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... under Review. The Department of Justice (DOJ), Antitrust Division (ATR), will be submitting the following information collection request to the Office of Management and Budget (OMB) for review and... DEPARTMENT OF JUSTICE [OMB Number 1105-0025] Agency Information Collection Activities: Proposed...

  16. 43 CFR 3481.3 - Confidentiality.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... part or part 3400 of this title shall be open for public inspection and copying during regular office... geologic and geophysical data and maps pertaining to Federal recoverable coal reserves obtained from...)), such as geologic and geophysical data and maps, shall not be available for public inspection or made...

  17. 43 CFR 3481.3 - Confidentiality.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... part or part 3400 of this title shall be open for public inspection and copying during regular office... geologic and geophysical data and maps pertaining to Federal recoverable coal reserves obtained from...)), such as geologic and geophysical data and maps, shall not be available for public inspection or made...

  18. 43 CFR 3481.3 - Confidentiality.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... part or part 3400 of this title shall be open for public inspection and copying during regular office... geologic and geophysical data and maps pertaining to Federal recoverable coal reserves obtained from...)), such as geologic and geophysical data and maps, shall not be available for public inspection or made...

  19. 30 CFR 912.700 - Idaho Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.700 Idaho Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in Idaho...

  20. 30 CFR 905.700 - California Federal Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE CALIFORNIA § 905.700 California Federal Program. (a) This part contains all rules that are applicable to surface coal mining operations in...

  1. 30 CFR 947.700 - Washington Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE WASHINGTON § 947.700 Washington Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in...

  2. 30 CFR 922.700 - Michigan Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN § 922.700 Michigan Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in...

  3. 30 CFR 910.700 - Georgia Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA § 910.700 Georgia Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in Georgia...

  4. 30 CFR 937.700 - Oregon Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON § 937.700 Oregon Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in Oregon...

  5. 30 CFR 942.700 - Tennessee Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE TENNESSEE § 942.700 Tennessee Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in...

  6. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... national forest, as specified in § 761.11(b) of this chapter. (b) OSM is responsible for: (1) Providing a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4...

  7. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... national forest, as specified in § 761.11(b) of this chapter. (b) OSM is responsible for: (1) Providing a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4...

  8. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... national forest, as specified in § 761.11(b) of this chapter. (b) OSM is responsible for: (1) Providing a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4...

  9. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... national forest, as specified in § 761.11(b) of this chapter. (b) OSM is responsible for: (1) Providing a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4...

  10. 20 CFR 725.510 - Representative payee.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Representative payee. 725.510 Section 725.510 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... SAFETY AND HEALTH ACT, AS AMENDED Payment of Benefits General Provisions § 725.510 Representative payee...

  11. 43 CFR 4.1373 - Hearing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Hearing. 4.1373 Section 4.1373 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Review of Osm Decisions Proposing to...

  12. 30 CFR 769.15 - Intervention.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Intervention. 769.15 Section 769.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE... SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.15 Intervention. Up to 3...

  13. 30 CFR 769.15 - Intervention.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Intervention. 769.15 Section 769.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE... SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.15 Intervention. Up to 3...

  14. 30 CFR 769.15 - Intervention.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Intervention. 769.15 Section 769.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE... SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.15 Intervention. Up to 3...

  15. 30 CFR 769.15 - Intervention.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Intervention. 769.15 Section 769.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE... SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.15 Intervention. Up to 3...

  16. 30 CFR 769.15 - Intervention.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Intervention. 769.15 Section 769.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE... SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.15 Intervention. Up to 3...

  17. Crowding-out effect of coal industry investment in coal mining area: taking Shanxi province in China as a case.

    PubMed

    Li, Li; Lei, Yalin; Xu, Qun; Wu, Sanmang; Yan, Dan; Chen, Jiabin

    2017-10-01

    The rapid development of coal industry in Shanxi province in China has important effects on its economic development. A large amount of money has been invested into the coal industry and other related industries during the recent years. However, research on the investment effect of Shanxi's coal industry was rare. In order to analyze the investment effect of coal industry, based on the crowding-out effect model, cointegration test, and the data available in Shanxi Statistical Yearbooks, this paper calculates the effect between coal industry investment and other 17 industry investment. The results show that the investment of coal industry produces crowding-out effect on food industry, building materials industry, and machinery industry. Increasing 1% of the coal industry investment can reduce 0.25% of the food industry investment, or 0.6% of building materials industry investment, or 0.52% of the machinery industry investment, which implies that Shanxi province should adjust coal industrial structure, promote the balance development of coal industry and other industries, so as to promote its economic growth.

  18. Northern Cheyenne Reservation Coal Bed Natural Resource Assessment and Analysis of Produced Water Disposal Options

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaochang Wo; David A. Lopez; Jason Whiteman Sr.

    Coalbed methane (CBM) development in the Powder River Basin (PRB) is currently one of the most active gas plays in the United States. Monthly production in 2002 reached about 26 BCF in the Wyoming portion of the basin. Coalbed methane reserves for the Wyoming portion of the basin are approximately 25 trillion cubic feet (TCF). Although coal beds in the Powder River Basin extend well into Montana, including the area of the Northern Cheyenne Indian Reservation, the only CBM development in Montana is the CX Field, operated by the Fidelity Exploration, near the Wyoming border. The Northern Cheyenne Reservation ismore » located on the northwest flank of the PRB in Montana with a total land of 445,000 acres. The Reservation consists of five districts, Lame Deer, Busby, Ashland, Birney, and Muddy Cluster and has a population of 4,470 according to the 2000 Census. The CBM resource represents a significant potential asset to the Northern Cheyenne Indian Tribe. Methane gas in coal beds is trapped by hydrodynamic pressure. Because the production of CBM involves the dewatering of coalbed to allow the release of methane gas from the coal matrix, the relatively large volume of the co-produced water and its potential environmental impacts are the primary concerns for the Tribe. Presented in this report is a study conducted by the Idaho National Engineering and Environmental Laboratory (INEEL) and the Montana Bureau of Mines and Geology (MBMG) in partnership with the Northern Cheyenne Tribe to assess the Tribe’s CBM resources and evaluate applicable water handling options. The project was supported by the U.S. Department of Energy (DOE) through the Native American Initiative of the National Petroleum Technology Office, under contract DEAC07- 99ID13727. Matching funds were granted by the MBMG in supporting the work of geologic study and mapping conducted at MBMG.« less

  19. Assessment of Potential for Colloidal Fuels

    DTIC Science & Technology

    1975-06-01

    Scientific Officer U casfe ""DOffice of Naval ResearchS800O N, Quinc’y $truet -~~~~~_ ! A r i g o , V C1 ) V ; I - A S S I F I C A T J "O Nr D f J...of Colloidal Fuels .............. . . page 12 The BCL Colloidal Fuel Costing Rationale . . . . . . . Appendix A $ Alternative Assessment of the Cost...partievia ny as coal part icl siz(-s are reducud it’ss than 70 microns. Note in Table 11 that the impact of thev fine~r Coal Of Batch1 12 rc suIt’s in a moiC

  20. Energy Crunch is Stimulant for Coal Research

    ERIC Educational Resources Information Center

    Chemical and Engineering News, 1973

    1973-01-01

    Presents views of the first International Coal Research Conference, involving problems facing reconversion to a coal-based energy economy, organization and funding of coal research units, development of new techniques for mining and using coal; and transportation of coal products to users. (CC)

  1. 43 CFR 4.1103 - Eligibility to practice.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Eligibility to practice. 4.1103 Section 4.1103 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals General Provisions § 4.1103...

  2. Exploring Virtual Mental Practice in Maintenance Task Training

    ERIC Educational Resources Information Center

    Bauerle, Tim; Brnich, Michael J.; Navoyski, Jason

    2016-01-01

    Purpose: This paper aims to contribute to a general understanding of mental practice by investigating the utility of and participant reaction to a virtual reality maintenance training among underground coal mine first responders. Design/Methodology/Approach: Researchers at the National Institute for Occupational Safety and Health's Office of Mine…

  3. 30 CFR 761.17 - Regulatory authority obligations at time of permit application review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permit application review. 761.17 Section 761.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE FOR MINING AREAS DESIGNATED BY ACT OF... of an administratively complete application for a permit for a surface coal mining operation, or an...

  4. Hydrographic Service Royal Australian Navy

    DTIC Science & Technology

    1993-01-01

    relocation of the Hydrographic Office to Wollongong, NSW; "* A marked decline in chart production caused by workforce changes as a result of the impending...amalgamate the plans of Clinton Coal Loader Wharf and Auckland Point to Barney Point in one plan at scale 1:10 000. The chart now provides continuous

  5. 20 CFR 726.315 - Contents.

    Code of Federal Regulations, 2010 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Contents. 726.315 Section 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY... Money Penalties § 726.315 Contents. Any petition or cross-petition for review shall: (a) Be dated; (b...

  6. 30 CFR 772.10 - Information collection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Information collection. 772.10 Section 772.10... REQUIREMENTS FOR COAL EXPLORATION § 772.10 Information collection. (a) In accordance with 44 U.S.C. 3501 et seq., the Office of Management and Budget (OMB) has approved the information collection and recordkeeping...

  7. 30 CFR 772.10 - Information collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Information collection. 772.10 Section 772.10... REQUIREMENTS FOR COAL EXPLORATION § 772.10 Information collection. (a) In accordance with 44 U.S.C. 3501 et seq., the Office of Management and Budget (OMB) has approved the information collection and recordkeeping...

  8. 43 CFR 3482.3 - Mining operations maps.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and up-to-date maps of the mine, drawn to scales acceptable to the authorized officer. Before a mine... boundary lines; surface buildings; dip of the coal bed(s); true north; map scale; map explanation; location...; geologic conditions as determined from outcrops, drill holes, exploration, or mining; any unusual geologic...

  9. 43 CFR 3482.3 - Mining operations maps.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and up-to-date maps of the mine, drawn to scales acceptable to the authorized officer. Before a mine... boundary lines; surface buildings; dip of the coal bed(s); true north; map scale; map explanation; location...; geologic conditions as determined from outcrops, drill holes, exploration, or mining; any unusual geologic...

  10. 43 CFR 3482.3 - Mining operations maps.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and up-to-date maps of the mine, drawn to scales acceptable to the authorized officer. Before a mine... boundary lines; surface buildings; dip of the coal bed(s); true north; map scale; map explanation; location...; geologic conditions as determined from outcrops, drill holes, exploration, or mining; any unusual geologic...

  11. 43 CFR 3472.2-1 - Sole party in interest statement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL MANAGEMENT PROVISIONS AND LIMITATIONS... for a lease or license to mine shall submit to the Bureau of Land Management State Office having... regarding knowledge of written consent from any qualified surface owner for the area involved (43 CFR...

  12. 43 CFR 3472.2-1 - Sole party in interest statement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL MANAGEMENT PROVISIONS AND LIMITATIONS... for a lease or license to mine shall submit to the Bureau of Land Management State Office having... regarding knowledge of written consent from any qualified surface owner for the area involved (43 CFR...

  13. 43 CFR 3472.2-1 - Sole party in interest statement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL MANAGEMENT PROVISIONS AND LIMITATIONS... for a lease or license to mine shall submit to the Bureau of Land Management State Office having... regarding knowledge of written consent from any qualified surface owner for the area involved (43 CFR...

  14. 43 CFR 3472.2-1 - Sole party in interest statement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL MANAGEMENT PROVISIONS AND LIMITATIONS... for a lease or license to mine shall submit to the Bureau of Land Management State Office having... regarding knowledge of written consent from any qualified surface owner for the area involved (43 CFR...

  15. 20 CFR 726.316 - Filing and service.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Filing and service. 726.316 Section 726.316 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... Secretary shall be filed with the Secretary of Labor, U.S. Department of Labor, 200 Constitution Ave., N.W...

  16. 20 CFR 726.316 - Filing and service.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Filing and service. 726.316 Section 726.316 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... Secretary shall be filed with the Secretary of Labor, U.S. Department of Labor, 200 Constitution Ave., N.W...

  17. 30 CFR 745.11 - Application and agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... approval under part 731 of this chapter, and has or may have within the State surface coal mining and... the full text of the terms of the proposed cooperative agreement as submitted or as subsequently...

  18. 43 CFR 3484.1 - Performance standards for exploration and surface and underground mining.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer. Operators/lessees of underground coal mines shall adopt measures consistent with known technology... subsequent operations on the quantity, quality, or pressure of ground water or mine gases only with the... mines—(1) Underground resource recovery. Underground mining operations shall be conducted so as to...

  19. 43 CFR 3484.1 - Performance standards for exploration and surface and underground mining.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer. Operators/lessees of underground coal mines shall adopt measures consistent with known technology... subsequent operations on the quantity, quality, or pressure of ground water or mine gases only with the... mines—(1) Underground resource recovery. Underground mining operations shall be conducted so as to...

  20. 75 FR 44980 - Notice of Availability of the Record of Decision for the Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... CONTACT: Mr. Tyson Sackett, Acting Wyoming Coal Coordinator, at 307-775-6487, or Ms. Mavis Love, Land Law Examiner, at 307-775-6258. Both Mr. Sackett and Ms. Love are located at the BLM Wyoming State Office, 5353...

  1. 20 CFR 726.300 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Purpose and scope. 726.300 Section 726.300 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... INSURANCE Civil Money Penalties § 726.300 Purpose and scope. Any operator which is required to secure the...

  2. 30 CFR 870.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Information collection. 870.10 Section 870.10... ABANDONED MINE LAND RECLAMATION ABANDONED MINE RECLAMATION FUND-FEE COLLECTION AND COAL PRODUCTION REPORTING § 870.10 Information collection. In accordance with 44 U.S.C. 3501 et seq., the Office of Management and...

  3. 30 CFR 769.13 - Contents of petitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Contents of petitions. 769.13 Section 769.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS... TYPES OF SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.13 Contents...

  4. 30 CFR 702.12 - Contents of application for exemption.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Contents of application for exemption. 702.12 Section 702.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.12...

  5. 30 CFR 769.13 - Contents of petitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contents of petitions. 769.13 Section 769.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS... TYPES OF SURFACE COAL MINING OPERATIONS AND FOR TERMINATION OF PREVIOUS DESIGNATIONS § 769.13 Contents...

  6. 30 CFR 702.12 - Contents of application for exemption.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contents of application for exemption. 702.12 Section 702.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.12...

  7. 20 CFR 410.686c - Petition for approval of fee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 410.686c Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY... performed before the Social Security Administration in any proceeding under the Act, a representative, upon completion of the proceedings in which he rendered services, must file at an office of the Social Security...

  8. 43 CFR 4.1362 - Where to file; when to file.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Request for Review... Transfer, Assignment Or Sale of Rights Granted Under Permit (federal Program; Federal Lands Program... file; when to file. (a) The request for review shall be filed with the Hearings Division, Office of...

  9. 30 CFR 702.16 - Stockpiling of minerals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Stockpiling of minerals. 702.16 Section 702.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.16 Stockpiling of...

  10. 30 CFR 702.16 - Stockpiling of minerals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Stockpiling of minerals. 702.16 Section 702.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.16 Stockpiling of...

  11. 30 CFR 702.16 - Stockpiling of minerals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Stockpiling of minerals. 702.16 Section 702.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.16 Stockpiling of...

  12. 30 CFR 702.16 - Stockpiling of minerals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Stockpiling of minerals. 702.16 Section 702.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.16 Stockpiling of...

  13. 30 CFR 702.16 - Stockpiling of minerals.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Stockpiling of minerals. 702.16 Section 702.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL EXEMPTION FOR COAL EXTRACTION INCIDENTAL TO THE EXTRACTION OF OTHER MINERALS § 702.16 Stockpiling of...

  14. 7 CFR Exhibit F to Subpart A of... - Payment Bond

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS..., lubricants, oil, gasoline, coal and coke, repairs on machinery; equipment and tools, consumed or used in..., OWNER, or SURETY, at any place where an office is regularly maintained for the transaction of business...

  15. DEVELOPMENT OF A VORTEX CONTAINMENT COMBUSTOR FOR COAL COMBUSTION SYSTEMS

    EPA Science Inventory

    The report describes the development of a vortex containment combustor (VCC) for coal combustion systems, designed to solve major problems facing the conversion of oil- and gas-fired boilers to coal (e.g., derating, inorganic impurities in coal, and excessive formation of NOx and...

  16. DEVELOPMENT OF A VORTEX CONTAINMENT COMBUSTOR FOR COAL COMBUSTION SYTEMS

    EPA Science Inventory

    The report describes the development of a vortex containment combustor (VCC) for coal combustion systems, designed to solve major problems facing the conversion of oil- and gas-fired boilers to coal (e.g., derating, inorganic impurities in coal, and excessive formation of NOx and...

  17. Fossil energy program

    NASA Astrophysics Data System (ADS)

    McNeese, L. E.

    1981-12-01

    The progress made during the period from July 1 through September 30 for the Oak Ridge National Laboratory research and development projects in support of the increased utilization of coal and other fossil fuels as sources of clean energy is reported. The following topics are discussed: coal conversion development, chemical research and development, materials technology, fossil energy materials program, liquefaction projects, component development, process analysis, environmental control technology, atmospheric fluidized bed combustion, underground coal gasification, coal preparation and waste utilization.

  18. Development of coal-feeding systems at the Morgantown Energy Research Center

    NASA Technical Reports Server (NTRS)

    Hobday, J. M.

    1977-01-01

    Systems for feeding crushed and pulverized coal into coal conversion reactor vessels are described. Pneumatic methods for feeding pulverized coal, slurry feeders, and coal pumps, methods for steam pickup, and a method for drying a water-coal slurry in a steam fluidized bed subsequent to feeding the coal into a reactor vessel are included.

  19. Investigation of Radiometric Combustion Monitoring Techniques for Coal- Fired Stoker Boilers

    DTIC Science & Technology

    1993-09-01

    Office ATTN: CECPW-FU-P 22060 Ft Devens 01433 US Army Envr Hygiene Agency ATTN: AFZD-DE ATTN: HSHB-ME 21010 US Army Engr District Fort Drum 13602 ATTN...Library (40) ATTN: AFZS-EH-E US Gov’t Printing Office 20401 Fort Irwin 92310 ATFN: Rac SecDeposit Sac (2) US Army Engr Division ATTN: AFZJ-EH ATTN...66 USACERL DISTRIBUTION Chief of Engiaes Fort McCoy 54656 Tyndall AFB 32403 ATTN: CEHEC-IM-LH (2) ATTN: AFZR-DE ATTN: AFESC Program O(c ATTN: CEHEC-IM

  20. Underground Coal Thermal Treatment: Task 6 Topical Report, Utah Clean Coal Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, P.J.; Deo, M.; Edding, E.G.

    The long-term objective of this task is to develop a transformational energy production technology by in- situ thermal treatment of a coal seam for the production of substitute natural gas and/or liquid transportation fuels while leaving much of the coal’s carbon in the ground. This process converts coal to a high-efficiency, low-greenhouse gas (GHG) emitting fuel. It holds the potential of providing environmentally acceptable access to previously unusable coal resources. This task focused on three areas: Experimental. The Underground Coal Thermal Treatment (UCTT) team focused on experiments at two scales, bench-top and slightly larger, to develop data to understand themore » feasibility of a UCTT process as well as to develop validation/uncertainty quantification (V/UQ) data for the simulation team. Simulation. The investigators completed development of High Performance Computing (HPC) simulations of UCTT. This built on our simulation developments over the course of the task and included the application of Computational Fluid Dynamics (CFD)- based tools to perform HPC simulations of a realistically sized domain representative of an actual coal field located in Utah. CO 2 storage. In order to help determine the amount of CO 2 that can be sequestered in a coal formation that has undergone UCTT, adsorption isotherms were performed on coals treated to 325, 450, and 600°C with slow heating rates. Raw material was sourced from the Sufco (Utah), Carlinville (Illinois), and North Antelope (Wyoming) mines. The study indicated that adsorptive capacity for the coals increased with treatment temperature and that coals treated to 325°C showed less or similar capacity to the untreated coals.« less

  1. Coal pump development phase 3

    NASA Technical Reports Server (NTRS)

    Kushida, R. O.; Sankur, V. D.; Gerbracht, F. G.; Mahajan, V.

    1980-01-01

    Techniques for achieving continuous coal sprays were studied. Coazial injection with gas and pressure atomization were studied. Coal particles, upon cooling, were found to be porous and fragile. Reactivity tests on the extruded coal showed overall conversion to gases and liquids unchanged from that of the raw coal. The potentials for applications of the coal pump to eight coal conversion processes were examined.

  2. Development of a 5 kW Prototype Coal-Based Fuel Cell

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chuang, Steven S.C.; Mirzababaei, Jelvehnaz; Rismanchian, Azadeh

    2014-01-20

    The University of Akron Fuel Cell Laboratory pioneered the development of a laboratory scale coal-based fuel cell, which allows the direct use of high sulfur content coal as fuel. The initial research and coal fuel cell technology development (“Coal-based Fuel Cell,” S. S. C. Chuang, PCT Int. Appl. 2006, i.e., European Patent Application, 35 pp. CODEN: PIXXD2 WO 2006028502 A2 20060316) have demonstrated that it is feasible to electrochemically oxidize carbon to CO2, producing electricity. The key innovative concept of this coal-based fuel cell technology is that carbon in coal can be converted through an electrochemical oxidation reaction into manageablemore » carbon dioxide, efficiently generating electricity without involving coal gasification, reforming, and water-gas shift reaction. This study has demonstrated that electrochemical oxidation of carbon can take place on the Ni anode surface and the CO and CO 2 product produced can further react with carbon to initiate the secondary reaction. A carbon injection system was developed to inject the solid fuel without bringing air into the anode chamber; a fuel cell stack was developed and tested to demonstrate the feasibility of the fuel cell stack. Further improvement of anode catalyst activity and durability is needed to bring this novel coal fuel cell to a highly efficient, super clean, multi-use electric generation technology, which promises to provide low cost electricity by expanding the utilization of U.S. coal supplies and relieving our dependence on foreign oil.« less

  3. 43 CFR 3483.5 - Crediting of production toward diligent development.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... development. (a) For Federal coal leases issued after August 4, 1976, all production after the effective date of the Federal lease shall be credited toward diligent development. (b) For Federal coal leases... after August 4, 1976, shall be credited toward diligent development. (c) For Federal coal leases issued...

  4. 43 CFR 3483.5 - Crediting of production toward diligent development.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... development. (a) For Federal coal leases issued after August 4, 1976, all production after the effective date of the Federal lease shall be credited toward diligent development. (b) For Federal coal leases... after August 4, 1976, shall be credited toward diligent development. (c) For Federal coal leases issued...

  5. 43 CFR 3483.5 - Crediting of production toward diligent development.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... development. (a) For Federal coal leases issued after August 4, 1976, all production after the effective date of the Federal lease shall be credited toward diligent development. (b) For Federal coal leases... after August 4, 1976, shall be credited toward diligent development. (c) For Federal coal leases issued...

  6. 43 CFR 3483.5 - Crediting of production toward diligent development.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... development. (a) For Federal coal leases issued after August 4, 1976, all production after the effective date of the Federal lease shall be credited toward diligent development. (b) For Federal coal leases... after August 4, 1976, shall be credited toward diligent development. (c) For Federal coal leases issued...

  7. Oxy Coal Combustion at the US EPA

    EPA Science Inventory

    Oxygen enriched coal (oxy-coal) combustion is a developing, and potentially a strategically key technology intended to accommodate direct CO2 recovery and sequestration. Oxy-coal combustion is also intended for retrofit application to existing power plants. During oxy-coal comb...

  8. ESTIMATION OF NEAR SUBSURFACE COAL FIRE GAS EMISSIONS BASED ON GEOPHYSICAL INVESTIGATIONS

    NASA Astrophysics Data System (ADS)

    Chen-Brauchler, D.; Meyer, U.; Schlömer, S.; Kus, J.; Gundelach, V.; Wuttke, M.; Fischer, C.; Rueter, H.

    2009-12-01

    Spontaneous and industrially caused subsurface coal fires are worldwide disasters that destroy coal resources, cause air pollution and emit a large amount of green house gases. Especially in developing countries, such as China, India and Malaysia, this problem has intensified over the last 15 years. In China alone, 10 to 20 million tons of coal are believed to be lost in uncontrolled coal fires. The cooperation of developing countries and industrialized countries is needed to enforce internationally concerted approaches and political attention towards the problem. The Clean Development Mechanism (CDM) under the framework of the Kyoto Protocol may provide an international stage for financial investment needed to fight the disastrous situation. A Sino-German research project for coal fire exploration, monitoring and extinction applied several geophysical approaches in order to estimate the annual baseline especially of CO2 emissions from near subsurface coal fires. As a result of this project, we present verifiable methodologies that may be used in the CDM framework to estimate the amount of CO2 emissions from near subsurface coal fires. We developed three possibilities to approach the estimation based on (1) thermal energy release, (2) geological and geometrical determinations as well as (3) direct gas measurement. The studies involve the investigation of the physical property changes of the coal seam and bedrock during different burning stages of a underground coal fire. Various geophysical monitoring methods were applied from near surface to determine the coal volume, fire propagation, temperature anomalies, etc.

  9. Experience in feeding coal into a liquefaction process development unit

    NASA Technical Reports Server (NTRS)

    Akhtar, S.; Friedman, S.; Mazzocco, N. J.; Yavorsky, P. M.

    1977-01-01

    A system for preparing coal slurry and feeding it into a high pressure liquefaction plant is described. The system was developed to provide supporting research and development for the Bureau of Mines coal liquefaction pilot plant. Operating experiences are included.

  10. Coal availability in the Hilight Quadrangle, Powder River Basin, Wyoming; a prototype study in a western coal field

    USGS Publications Warehouse

    Molnia, Carol L.; Biewick, Laura; Blake, Dorsey; Tewalt, Susan J.; Carter, M. Devereaux; Gaskill, Charlie

    1997-01-01

    The U.S. Geological Survey (USGS), in cooperation with the Bureau of Land Management (BLM), Geological Survey of Wyoming, and U.S. Bureau of Mines (USBM), has produced an estimate of the amount of available coal in an area about 35 miles south of Gillette, Wyo., where the Wyodak coal bed is, in places, more than 100 ft thick. Available coal is the quantity of the total coal resource that is accessible for mine development under current regulatory, land-use, and technologic constraints. This first western coal availability study, of the Hilight 7 1/2-minute quadrangle, indicates that approximately 60 percent (2.7 billion short tons) of the total 4.4 billion tons of coal in-place in the quadrangle is available for development. (There has been no commercial mining in the Hilight quadrangle.) Approximately 67 percent (1.9 billion tons) of the Main Wyodak coal bed is considered available. All tonnage measurements in this report are given in short tons. Coal-development considerations in the quadrangle include dwellings, railroads, pipelines, power lines, wildlife habitat (eagles), alluvial valley floors, cemeteries, and the Hilight oil and gas field and gas plant. Some of these considerations could be mitigated so that surface mining of the coal may proceed; others could not be mitigated and would preclude mining in their vicinity. Other technological constraints that influence the availability of the coal include overburden thickness, coal beds too thin, and areas of clinker.

  11. Chapter 1: The Appalachian regional reforestation initiative

    Treesearch

    Patrick Angel; Vic Davis; Jim Burger; Don Graves; Carl Zipper

    2017-01-01

    The Appalachian Regional Reforestation Initiative (ARRI) is a cooperative effort by the States of the Appalachian region with the U.S. Department of the Interior's Office of Surface Mining Reclamation and Enforcement (OSMRE) to encourage restoration of high-quality forests on reclaimed coal mines in the eastern United States. The goals of ARRI are to communicate...

  12. 43 CFR 4.1280 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Applicable to Surface Coal Mining Hearings and Appeals Appeals to the Board from Decisions of the Office of Surface Mining § 4.1280 Scope. This section is applicable to appeals from decisions of the Director of OSM concerning small operator exemptions under 30 CFR 710.12(h) and to other appeals which are not required by...

  13. 20 CFR § 726.315 - Contents.

    Code of Federal Regulations, 2010 CFR

    2018-04-01

    ... 20 Employees' Benefits 4 2018-04-01 2018-04-01 false Contents. § 726.315 Section § 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... INSURANCE Civil Money Penalties § 726.315 Contents. Any petition or cross-petition for review shall: (a) Be...

  14. 30 CFR 886.11 - Who is eligible for a grant?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Who is eligible for a grant? 886.11 Section 886.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... all known coal problems in your State or on Indian lands in your jurisdiction have been addressed. ...

  15. 30 CFR 885.11 - Who is eligible for a grant?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Who is eligible for a grant? 885.11 Section 885.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... chapter that all known coal problems in your State or on Indian lands in your jurisdiction have been...

  16. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  17. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  18. 30 CFR 769.13 - Contents of petitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Contents of petitions. 769.13 Section 769.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE FOR MINING PETITION PROCESS FOR DESIGNATION OF FEDERAL LANDS AS UNSUITABLE FOR ALL OR CERTAIN TYPES OF SURFACE COAL MINING OPERATIONS...

  19. 43 CFR 4.1353 - Contents of request.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Contents of request. 4.1353 Section 4.1353 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Request for Hearing on A Preliminary Finding Concerning A Demonstrated...

  20. 43 CFR 4.1263 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Contents of application. 4.1263 Section 4.1263 Public Lands: Interior Office of the Secretary of the Interior DEPARTMENT HEARINGS AND APPEALS PROCEDURES Special Rules Applicable to Surface Coal Mining Hearings and Appeals Applications for Temporary Relief § 4.1263 Contents of application....

  1. 20 CFR § 726.315 - Contents.

    Code of Federal Regulations, 2010 CFR

    2017-04-01

    ... 20 Employees' Benefits 4 2017-04-01 2017-04-01 false Contents. § 726.315 Section § 726.315 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH... INSURANCE Civil Money Penalties § 726.315 Contents. Any petition or cross-petition for review shall: (a) Be...

  2. 76 FR 24919 - Division of Coal Mine Workers' Compensation Proposed Renewal of Existing Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can... collection request can be obtained by contacting the office listed below in the ADDRESSES section of this...

  3. 77 FR 13636 - Division of Coal Mine Workers' Compensation; Proposed Extension of Existing Collection; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... requested data can be provided in the desired format, reporting burden (time and financial resources) is... respondents can be properly assessed. Currently, the Office of Workers' Compensation Programs is soliciting... Benefit Payments (CM-908). A copy of the information collection request can be obtained by contacting the...

  4. 76 FR 17649 - Science Advisory Board Staff Office; Request for Nominations; SAB Mercury Review Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... responding to an EPA request for peer review of a March 2011 draft risk assessment for mercury, entitled Technical Support Document: National-Scale Mercury Risk Assessment Supporting the Appropriate and Necessary... a proposed rule concerning regulation of hazardous air pollutants (HAPs) released from coal-burning...

  5. 75 FR 70950 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... buildings, purchase mining equipment, and to create working capital. The office and mine are to be located... enterprise is: 212112 Bituminous Coal Underground Mining. DATES: All interested parties may submit comments... process. Comments should address the two bases for certification and, if possible, provide data to assist...

  6. 30 CFR 750.14 - Lands designated unsuitable for mining by Act of Congress.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Lands designated unsuitable for mining by Act of Congress. 750.14 Section 750.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INDIAN LANDS PROGRAM REQUIREMENTS FOR SURFACE COAL MINING AND...

  7. 20 CFR 725.707 - Reports of physicians and supervision of medical care.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... medical care. 725.707 Section 725.707 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED CLAIMS FOR BENEFITS UNDER PART C OF TITLE IV OF THE FEDERAL MINE SAFETY AND HEALTH ACT, AS AMENDED Medical Benefits and...

  8. Tactical approach for determining impact of energy development on wildlife in Wyoming: special report number 1

    USGS Publications Warehouse

    Keenlyne, Kent D.

    1977-01-01

    The U.S. Fish and Wildlife Service, within the Department of Interior, is responsible for providing national leadership in the management and protection of the nation's fish and wildlife resources, their habitat, and environment. Specifically, the Office of Biological Services obtains and assimilates biological and environmental data and identifies additional informational needs and means necessary to provide biological input into major natural resource decisions. The Wyoming Coal Coordinator for the U.S Fish and Wildlife Service is assigned the duty of becoming attuned to the ramifications of energy development within the State and its potential impact upon wildlife. In order for the Coal Coordinator to fulfill his obligations in becoming an "energy expert" for the Fish and Wildlife Service in Wyoming, it will be necessary for him to develop a means of obtaining an overview of the energy development situation. Similarly, in order for him to identify those area of critical concern to wildlife resources, it will be necessary that he determine or predict where energy development will occur, the nature of this development, and the cumulative effects of energy development upon wildlife. Likewise, in order to identify where wildlife data gaps occur and to determine future wildlife information needs, it will be necessary for him to compile and synthesize relevant existing data resources. It therefore becomes apparent that a need exists for him to gather and interpret pertinent information in a systematic way to meet these ends. The following is an account of the tactical number in which the Wyoming Coal Coordinator intends to approach the duties outlined above the rationale to be followed in meeting these needs. First, a general discussion on assessing impacts on wildlife is provided to form a basis for obtaining an overview. Secondly, a series of reports which will be generated to summarize existing information and to help identify potential problem areas is outlined. These reports will be further utilized to determine wildlife data gaps and future information needs related to wildlife and future energy development.

  9. Coal Mining Machinery Development As An Ecological Factor Of Progressive Technologies Implementation

    NASA Astrophysics Data System (ADS)

    Efremenkov, A. B.; Khoreshok, A. A.; Zhironkin, S. A.; Myaskov, A. V.

    2017-01-01

    At present, a significant amount of energy spent for the work of mining machines and coal mining equipment on coal mines and open pits goes to the coal grinding in the process of its extraction in mining faces. Meanwhile, the increase of small fractions in mined coal does not only reduce the profitability of its production, but also causes a further negative impact on the environment and degrades labor conditions for miners. The countermeasure to the specified processes is possible with the help of coal mining equipment development. However, against the background of the technological decrease of coal mine equipment applied in Russia the negative impact on the environment is getting reinforced.

  10. Study of application of ERTS-A imagery to fracture-related mine safety hazards in the coal mining industry

    NASA Technical Reports Server (NTRS)

    Wier, C. E.; Wobber, F. J.; Russell, O. R.; Martin, K. R. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. Mined land reclamation analysis procedures developed within the Indiana portion of the Illinois Coal Basin were independently tested in Ohio utilizing 1:80,000 scale enlargements of ERTS-1 image 1029-15361-7 (dated August 21, 1972). An area in Belmont County was selected for analysis due to the extensive surface mining and the different degrees of reclamation occurring in this area. Contour mining in this area provided the opportunity to extend techniques developed for analysis of relatively flat mining areas in Indiana to areas of rolling topography in Ohio. The analysts had no previous experience in the area. Field investigations largely confirmed office analysis results although in a few areas estimates of vegetation percentages were found to be too high. In one area this error approximated 25%. These results suggest that systematic ERTS-1 analysis in combination with selective field sampling can provide reliable vegetation percentage estimates in excess of 25% accuracy with minimum equipment investment and training. The utility of ERTS-1 for practical and reasonably reliable update of mined lands information for groups with budget limitations is suggested. Many states can benefit from low cost updates using ERTS-1 imagery from public sources.

  11. ELECTROKINETIC DENSIFICATION OF COAL FINES IN WASTE PONDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. James Davis

    1999-12-18

    The objective of this research was to demonstrate that electrokinetics can be used to remove colloidal coal and mineral particles from coal-washing ponds and lakes without the addition of chemical additives such as salts and polymeric flocculants. The specific objectives were: Design and develop a scaleable electrophoresis apparatus to clarify suspensions of colloidal coal and clay particles; Demonstrate the separation process using polluted waste water from the coal-washing facilities at the coal-fired power plants in Centralia, WA; Develop a mathematical model of the process to predict the rate of clarification and the suspension electrical properties needed for scale up.

  12. Prediction of coal grindability from exploration data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gomez, M.; Hazen, K.

    1970-08-01

    A general prediction model for the Hardgrove grindability index was constructed from 735 coal samples using the proximate analysis, heating value, and sulfur content. The coals used to develop the general model ranged in volatile matter from 12.8 to 49.2 percent, dry basis, and had grindability indexes ranging from 35 to 121. A restricted model applicable to bituminous coals having grindabilities in the 40 to 110 range was developed from the proximate analysis and the petrographic composition of the coal. The prediction of coal grindability within a single seam was also investigated. The results reported support the belief that mechanicalmore » properties of the coal are related to both chemical and petrographic factors of the coal. The mechanical properties coal may be forecast in advance of mining, because the variables used as input to the prediction models can be measured from drill core samples collected during exploration.« less

  13. Refining and end use study of coal liquids I - pilot plant studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erwin, J.; Moulton, D.S.

    1995-12-31

    The Office of Fossil Energy, Pittsburgh Energy Technology Center is examining the ways in which coal liquids may best be integrated into the refinery of the 2000-2015 time frame and what performance and emission properties will prevail among the slate of fuels produced. The study consists of a Basic Program administered by Bechtel Group, Inc. to build a linear programming refinery model and provide processing and fuel properties data through subcontractors Southwest Research Institute, Amoco Oil R&D, and M.W. Kellogg Company. The model will be used in an Option 1 to devise a slate of test fuels meeting advanced specifications,more » which will be produced and tested for physical ASTM-type properties, engine performance, and vehicle emissions. Three coal liquids will be included: a direct liquid from bituminous coal, another from subbituminous, and a Fischer-Tropsch indirect liquefaction product. This paper reports the work to date on fractions of the first direct liquid including naphtha hydrotreating, heavy distillate hydrotreating, FCC of the heavy distillate hydrotreater products. Also reported are the first stages of work on the indirect liquefaction wax including feed preparation and FCC tests of blends with petroleum FCC feed.« less

  14. Bioregional Assessments: Determining the Impacts of Coal Resource Development on Water Resources in Australia through Groundwater, Surface Water and Ecological Modelling

    NASA Astrophysics Data System (ADS)

    Peeters, L. J.; Post, D. A.; Crosbie, R.; Holland, K.

    2017-12-01

    While extraction of methane from shale gas deposits has been the principal source of the recent expansion of the industry in the United States, in Australia extraction of methane from coal bed methane deposits (termed `coal seam gas' in Australia) has been the focus to date. The two sources of methane share many of the same characteristics including the potential requirement for hydraulic fracturing. However, as coal seam gas deposits generally occur at shallower depths than shale gas, the potential impacts of extraction on surface and groundwater resources may be of even greater concern. The Australian Federal Government commissioned a multi-disciplinary programme of bioregional assessments to improve understanding of the potential impacts of coal seam gas and large coal mining activities on water resources and water-dependent assets across six bioregions Australia. A bioregional assessment is a transparent scientific analysis of the ecology, hydrology, geology and hydrogeology of a bioregion with explicit assessment of the potential direct, indirect and cumulative impacts of coal seam gas and large coal mining development on water resources. The first step in the analysis is to establish the most likely scenario for coal development in each region and establish a causal pathway linking coal development to impacts to the social, economic and ecological functioning of water resources. This forms the basis for a sequence of probabilistic geological, hydrogeological, hydrological and ecological models to quantify the probability of potential impacts. This suite of models is developed independent of the proponents and regulators of coal resource developments and so can provide unbiased information to all stakeholders. To demonstrate transparency of the modelling, all inputs, outputs and executables will be available from http://www.bioregionalassessments.gov.au. The analysis delineated a zone of potential hydrological change for each region, outside of which impacts from coal development are very unlikely. Within each zone, the analysis provides a regional estimate of the likely impacts and identifies the major knowledge and data gaps. This information provides a framework for further local study.

  15. Preliminary report on coal resources of the Wyodak-Anderson coal zone, Powder River Basin, Wyoming and Montana

    USGS Publications Warehouse

    Ellis, Margaret S.; Gunther, Gregory L.; Flores, Romeo M.; Ochs, Allen M.; Stricker, Gary D.; Roberts, Steven B.; Taber, Thomas T.; Bader, Lisa R.; Schuenemeyer, John H.

    1998-01-01

    The National Coal Resource Assessment (NCRA) project by the U.S. Geological Survey is designed to assess US coal with the greatest potential for development in the next 20 to 30 years. Coal in the Wyodak-Anderson (WA) coal zone in the Powder River Basin of Wyoming and Montana is plentiful, clean, and compliant with EPA emissions standards. This coal is considered to be very desirable for development for use in electric power generation. The purpose of this NCRA study was to compile all available data relating to the Wyodak- Anderson coal, correlate the beds that make up the WA coal zone, create digital files pertaining to the study area and the WA coal, and produce a variety of reports on various aspects of the assessed coal unit. This report contains preliminary calculations of coal resources for the WA coal zone and is one of many products of the NCRA study. Coal resource calculations in this report were produced using both public and confidential data from many sources. The data was manipulated using a variety of commercially available software programs and several custom programs. A general description of the steps involved in producing the resource calculations is described in this report.

  16. Review of China's Low-Carbon City Initiative and Developments in the Coal Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fridley, David; Khanna, Nina Zheng; Hong, Lixuan

    As China continues its double-digit economic growth, coal remains the principal fuel for the country’s primary energy consumption and electricity generation. China’s dependence on coal in coming years makes its carbon emission intensity reduction targets more difficult to achieve, particularly given rising electricity demand from a growing number of Chinese cities. This paradox has led the government to pursue cleaner and more efficient development of the coal industry on the supply side and “low carbon” development of cities on the demand side. To understand and assess how China may be able to meet its energy and carbon intensity reduction targets,more » this report looks at the recent development of low carbon cities as well as new developments and trends in the coal industry. Specifically, we review low-carbon city and related eco-city development in China before delving into a comparison of eight pilot lowcarbon city plans to highlight their strengths and weaknesses in helping achieve national energy and carbon targets. We then provide insights into the future outlook for China’s coal industry by evaluating new and emerging trends in coal production, consumption, transport, trade and economic performance.« less

  17. Improving Competitiveness of U.S. Coal Dialogue

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kokkinos, Angelos

    The Improving Competitiveness of U.S. Coal Dialogue held in September 2017 explored a broad range of technical developments that have the potential to improve U.S. coal competitiveness in domestic and overseas markets. The workshop is one in a series of events hosted by DOE to gather expert input on challenges and opportunities for reviving the coal economy. This event brought together coal industry experts to review developments in a broad range of technical areas such as conventional physical (e.g. dense-medium) technologies, and dry coal treatments; thermal, chemical, and bio-oxidation coal upgrading technologies; coal blending; and applications for ultrafine coal andmore » waste streams. The workshop was organized to focus on three main discussion topics: Challenges and Opportunities for Improving U.S. Coal Competitiveness in Overseas Markets, Mineral Processing, and Technologies to Expand the Market Reach of Coal Products. In each session, invited experts delivered presentations to help frame the subsequent group discussion. Throughout the discussions, participants described many possible areas of research and development (R&D) in which DOE involvement could help to produce significant outcomes. In addition, participants discussed a number of open questions—those that the industry has raised or investigated but not yet resolved. In discussing the three topics, the participants suggested potential areas of research and issues for further investigation. As summarized in Table ES-1, these crosscutting suggestions centered on combustion technologies, coal quality, coal processing, environmental issues, and other issues. The discussions at this workshop will serve as an input that DOE considers in developing initiatives that can be pursued by government and industry. This workshop generated strategies that described core research concepts, identified implementation steps, estimated benefits, clarified roles of government and industry, and outlined next steps. While more work is needed, each of these initiatives, included in the sections that follow, details new ideas to increase efficiency and reduce carbon emissions. DOE will integrate the results of this workshop with ongoing research work at the National Laboratories as well as other relevant data sources. This combined information will be used to develop a comprehensive strategy for capitalizing on the opportunity for U.S. coal and mineral competitiveness.« less

  18. Economic and Technological Role of Kuzbass Industry in the Implementation of National Energy Strategy of Russian Federation

    NASA Astrophysics Data System (ADS)

    Zhironkin, S. A.; Khoreshok, A. A.; Tyulenev, M. A.; Barysheva, G. A.; Hellmer, M. C.

    2016-08-01

    This article describes the problems and prospects of development of coal mining in Kuzbass - the center of coal production in Siberia and Russia, in the framework of the major initiatives of the National Energy Strategy for the period until 2035. The structural character of the regional coal industry problems, caused by decline in investment activity, high level of fixed assets depreciation, slow development of deep coal processing and technological reduction of coal mining is shown.

  19. Quantitative Modelling of Trace Elements in Hard Coal.

    PubMed

    Smoliński, Adam; Howaniec, Natalia

    2016-01-01

    The significance of coal in the world economy remains unquestionable for decades. It is also expected to be the dominant fossil fuel in the foreseeable future. The increased awareness of sustainable development reflected in the relevant regulations implies, however, the need for the development and implementation of clean coal technologies on the one hand, and adequate analytical tools on the other. The paper presents the application of the quantitative Partial Least Squares method in modeling the concentrations of trace elements (As, Ba, Cd, Co, Cr, Cu, Mn, Ni, Pb, Rb, Sr, V and Zn) in hard coal based on the physical and chemical parameters of coal, and coal ash components. The study was focused on trace elements potentially hazardous to the environment when emitted from coal processing systems. The studied data included 24 parameters determined for 132 coal samples provided by 17 coal mines of the Upper Silesian Coal Basin, Poland. Since the data set contained outliers, the construction of robust Partial Least Squares models for contaminated data set and the correct identification of outlying objects based on the robust scales were required. These enabled the development of the correct Partial Least Squares models, characterized by good fit and prediction abilities. The root mean square error was below 10% for all except for one the final Partial Least Squares models constructed, and the prediction error (root mean square error of cross-validation) exceeded 10% only for three models constructed. The study is of both cognitive and applicative importance. It presents the unique application of the chemometric methods of data exploration in modeling the content of trace elements in coal. In this way it contributes to the development of useful tools of coal quality assessment.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cada, G.F.

    H-coal is a process for the direct liquefaction of coal to produce synthetic fuels. Its development has progressed from bench-scale testing through operation of a 2.7 Mg/d (3 ton/d) Process Development Unit. A large-scale H-Coal pilot plant is presently operating at Catlettsburg, Kentucky, and there are plans for the construction of a commercial H-Coal liquefaction facility by the end of the decade. Two of the environmental concerns of the developing direct coal liquefaction industry are accidental spills of synthetic oils and treatment/storage of solid wastes. As a means of obtaining preliminary information on the severity of these potential impacts wellmore » in advance of commercialization, samples of product oils and solid wastes were obtained from the H-Coal Process Development Unit (PDU). These samples were subjected to a battery of rapid screening tests, including chemical characterization and bioassays with a variety of aquatic and terrestrial organisms. Water-soluble fraction (WSFs) of H-Coal PDU oils had considerably higher concentrations of phenols and anilines and were commonly one to two orders of magnitude more toxic to aquatic organisms than WSFs of analogous petroleum crude oil. Whole H-Coal PDU oils were also more toxic to the cricket than petroleum-based oils, and some H-Coal samples showed evidence of teratogenicity. Leachates from H-Coal PDU solid wastes, on the other hand, had relatively low concentrations of selected elements and had essentially no acute toxicity to a variety of aquatic and terrestrial species. These studies indicate that environmental effects of product oil spills from a commercial H-Coal liquefaction plant are likely to be more severe than those of conventional petroleum spills. Product upgrading or special transportation and storage techniques may be needed to ensure environmentally sound commercialization of the H-Coal process.« less

  1. Quantitative Modelling of Trace Elements in Hard Coal

    PubMed Central

    Smoliński, Adam; Howaniec, Natalia

    2016-01-01

    The significance of coal in the world economy remains unquestionable for decades. It is also expected to be the dominant fossil fuel in the foreseeable future. The increased awareness of sustainable development reflected in the relevant regulations implies, however, the need for the development and implementation of clean coal technologies on the one hand, and adequate analytical tools on the other. The paper presents the application of the quantitative Partial Least Squares method in modeling the concentrations of trace elements (As, Ba, Cd, Co, Cr, Cu, Mn, Ni, Pb, Rb, Sr, V and Zn) in hard coal based on the physical and chemical parameters of coal, and coal ash components. The study was focused on trace elements potentially hazardous to the environment when emitted from coal processing systems. The studied data included 24 parameters determined for 132 coal samples provided by 17 coal mines of the Upper Silesian Coal Basin, Poland. Since the data set contained outliers, the construction of robust Partial Least Squares models for contaminated data set and the correct identification of outlying objects based on the robust scales were required. These enabled the development of the correct Partial Least Squares models, characterized by good fit and prediction abilities. The root mean square error was below 10% for all except for one the final Partial Least Squares models constructed, and the prediction error (root mean square error of cross–validation) exceeded 10% only for three models constructed. The study is of both cognitive and applicative importance. It presents the unique application of the chemometric methods of data exploration in modeling the content of trace elements in coal. In this way it contributes to the development of useful tools of coal quality assessment. PMID:27438794

  2. A characterization and evaluation of coal liquefaction process streams. Quarterly technical progress report, October 1--December 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.

    1995-05-01

    The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A samplemore » bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the literature and data experimentally obtained, a mathematical kinetic model of resid conversion will be constructed. It is anticipated that such a model will provide insights useful for improving process performance and thus the economics of direct coal liquefaction. During this quarter, analyses were completed on 65 process samples from representative periods of HRI Run POC-2 in which coal, coal/plastics, and coal/rubber were the feedstocks. A sample of the oil phase of the oil/water separator from HRI Run POC-1 was analyzed to determine the types and concentrations of phenolic compounds. Chemical analyses and microautoclave tests were performed to monitor the oxidation and measure the reactivity of the standard coal (Old Ben Mine No. 1) which has been used for the last six years to determine solvent quality of process oils analyzed in this and previous DOE contracts.« less

  3. H-Coal Pilot Plant: letdown-valve experience through Coal Run No. 7 in the H-Coal Pilot Plant, E-3. [Runs 1 thru 7

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, N.D.

    1982-05-01

    This report covers the development of the various letdown valves used for the two-stage high pressure and temperature coal slurry letdown system as used at the H-Coal Pilot Plant. The period covered in this report was from the prestart-up oil circulation through Coal Runs No. 1 - No. 7. The valves covered are the Willis, which was used exclusively from Coal Runs No. 1 - No. 5, the Cameron and the Kieley and Mueller. The LV-202B Kieley and Mueller and LV-204B Cameron valves again showed little valve wear during short Coal Run No. 7, which demonstrates that the full potentialmore » of these valve designs has not been achieved yet. The problem with the Kieley and Mueller plug freezing will be looked at further, with addition of grease ports and a possible new designed plug shaft and stem guide being made for the valve. The Willis valves developed the same body leaks around the bonnet areas that occurred during Coal Run No. 6. This will be looked at before Coal Run No. 8, but no further trim development is planned. To summarize the progress of the LV-202 and LV-204 valves, the Willis was developed to last about 100 hours, which is the expected life for this valve design in our coal liquefaction process; whereas, the Cameron and Kieley and Mueller valves have lasted for days with good results. The Cameron and Kieley and Mueller valves still have not reached their full potential in plant operation, and, along with the new Masoneilan Sasol, Masoneilan Prototype, Hammel Dahl and Paul valves, future progress in Coal Run No. 8 for the high pressure and temperature letdown valves is anticipated.« less

  4. Hydrotreating of coal-derived liquids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lott, S.E.; Stohl, F.V.; Diegert, K.V.

    1995-12-31

    To develop a database relating hydrotreating parameters to feed and product quality by experimentally evaluating options for hydrotreating whole coal liquids, distillate cuts of coal liquids, petroleum, and blends of coal liquids with petroleum.

  5. Carbon Dioxide Emission Factors for Coal

    EIA Publications

    1994-01-01

    The Energy Information Administration (EIA) has developed factors for estimating the amount of carbon dioxide emitted, accounting for differences among coals, to reflect the changing "mix" of coal in U.S. coal consumption.

  6. Ash characterization in laboratory-scale oxy-coal combustor

    EPA Science Inventory

    Oxygen enriched coal (oxy-coal) combustion is a developing technology. During oxy-coal combustion, combustion air is separated and the coal is burned in a mixture of oxygen and recycled flue gas. The resulting effluent must be further processed before the C02 can be compressed, t...

  7. Coal Market Module - NEMS Documentation

    EIA Publications

    2014-01-01

    Documents the objectives and the conceptual and methodological approach used in the development of the National Energy Modeling System's (NEMS) Coal Market Module (CMM) used to develop the Annual Energy Outlook 2014 (AEO2014). This report catalogues and describes the assumptions, methodology, estimation techniques, and source code of CMM's two submodules. These are the Coal Production Submodule (CPS) and the Coal Distribution Submodule (CDS).

  8. Chemistry of thermally altered high volatile bituminous coals from southern Indiana

    USGS Publications Warehouse

    Walker, R.; Mastalerz, Maria; Brassell, S.; Elswick, E.; Hower, J.C.; Schimmelmann, A.

    2007-01-01

    The optical properties and chemical characteristics of two thermally altered Pennsylvanian high volatile bituminous coals, the non-coking Danville Coal Member (Ro = 0.55%) and the coking Lower Block Coal Member (Ro = 0.56%) were investigated with the purpose of understanding differences in their coking behavior. Samples of the coals were heated to temperatures of 275????C, 325????C, 375????C and 425????C, with heating times of up to one hour. Vitrinite reflectance (Ro%) rises with temperature in both coals, with the Lower Block coal exhibiting higher reflectance at 375????C and 425????C compared to the Danville coal. Petrographic changes include the concomitant disappearance of liptinites and development of vesicles in vitrinites in both coals, although neither coal developed anisotropic coke texture. At 375????C, the Lower Block coal exhibits a higher aromatic ratio, higher reflectance, higher carbon content, and lower oxygen content, all of which indicate a greater degree of aromatization at this temperature. The Lower Block coal maintains a higher CH2/CH3 ratio than the Danville coal throughout the heating experiment, indicating that the long-chain unbranched aliphatics contained in Lower Block coal liptinites are more resistant to decomposition. As the Lower Block coal contains significant amounts of liptinite (23.6%), the contribution of aliphatics from these liptinites appears to be the primary cause of its large plastic range and high fluidity. ?? 2006 Elsevier B.V. All rights reserved.

  9. Coal and Open-pit surface mining impacts on American Lands (COAL)

    NASA Astrophysics Data System (ADS)

    Brown, T. A.; McGibbney, L. J.

    2017-12-01

    Mining is known to cause environmental degradation, but software tools to identify its impacts are lacking. However, remote sensing, spectral reflectance, and geographic data are readily available, and high-performance cloud computing resources exist for scientific research. Coal and Open-pit surface mining impacts on American Lands (COAL) provides a suite of algorithms and documentation to leverage these data and resources to identify evidence of mining and correlate it with environmental impacts over time.COAL was originally developed as a 2016 - 2017 senior capstone collaboration between scientists at the NASA Jet Propulsion Laboratory (JPL) and computer science students at Oregon State University (OSU). The COAL team implemented a free and open-source software library called "pycoal" in the Python programming language which facilitated a case study of the effects of coal mining on water resources. Evidence of acid mine drainage associated with an open-pit coal mine in New Mexico was derived by correlating imaging spectrometer data from the JPL Airborne Visible/InfraRed Imaging Spectrometer - Next Generation (AVIRIS-NG), spectral reflectance data published by the USGS Spectroscopy Laboratory in the USGS Digital Spectral Library 06, and GIS hydrography data published by the USGS National Geospatial Program in The National Map. This case study indicated that the spectral and geospatial algorithms developed by COAL can be used successfully to analyze the environmental impacts of mining activities.Continued development of COAL has been promoted by a Startup allocation award of high-performance computing resources from the Extreme Science and Engineering Discovery Environment (XSEDE). These resources allow the team to undertake further benchmarking, evaluation, and experimentation using multiple XSEDE resources. The opportunity to use computational infrastructure of this caliber will further enable the development of a science gateway to continue foundational COAL research.This work documents the original design and development of COAL and provides insight into continuing research efforts which have potential applications beyond the project to environmental data science and other fields.

  10. Analysis of ecological environment impact of coal exploitation and utilization

    NASA Astrophysics Data System (ADS)

    Zhang, Baoliu; Luo, Hong; Lv, Lianhong; Wang, Jian; Zhang, Baoshi

    2018-02-01

    Based on the theory of life cycle assessment, the ecological and environmental impacts of coal mining, processing, utilization and transportation will be analyzed, with analysing the status of china’s coal exploitation and utilization as the basis, it will find out the ecological and environmental impact in the development and utilization of coal, mainly consist of ecological impact including land damage, water resource destructionand biodiversity loss, etc., while the environmental impact include air, water, solid waste pollutions. Finally with a summary of the ecological and environmental problems, to propose solutionsand countermeasures to promote the rational development and consumption of coal, as well as to reduce the impact of coal production and consumption on the ecological environment, finally to achieve the coordinated development of energy and the environment.

  11. Coal Fields and Federal Lands of the Conterminous United States

    USGS Publications Warehouse

    Biewick, Laura

    1997-01-01

    The map depicts the relationship of coal and public lands in the conterminous U. S. Multiple GIS layers are being created for the purpose of deriving estimates of how much coal is owned and administered by the Federal government. Federal coal areas have a profound effect on land-management decisions. Regulatory agencies attempt to balance energy development with alternative land-use and environmental concerns. A GIS database of Federal lands used in energy resource assessments is being developed by the U. S. Geological Survey (USGS) in cooperation with the U.S. Bureau of Land Management (BLM) to integrate information on status of public land, and minerals owned by the Federal government with geologic information on coal resources, other spatial data, coal quality characteristics, and coal availability for development. Using national-scale data we estimate that approximately 60 percent of the area underlain by coal-bearing rocks in the conterminous United States are under Federal surface. Coal produced from Federal leases has tripled from about 12 percent of the total U.S. production in 1976 to almost 34 percent in 1995 (Energy Information Administration website ftp://ftp.eia.doe.gov/pub/coal/cia_95_tables/t13p01.txt). The reason for this increase is demand for low-sulfur coal for use in power plants and the fact that large reserves of this low-sulfur coal are in the western interior U.S., where the Federal government owns the rights to most of the coal reserves. The map was created using Arc/Info 7.0.3 on a UNIX system. The HPGL2 plot file for this map is available from the USGS Energy Resource Surveys Team from http://energy.cr.usgs.gov:8080/energy/coal.html.

  12. Demonstration of natural gas reburn for NO{sub x} emissions reduction at Ohio Edison Company`s cyclone-fired Niles Plant Unit Number 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borio, R.W.; Lewis, R.D.; Koucky, R.W.

    1996-04-01

    Electric utility power plants account for about one-third of the NO{sub x} and two-thirds of the SO{sub 2} emissions in the US cyclone-fired boilers, while representing about 9% of the US coal-fired generating capacity, emit about 14% of the NO{sub x} produced by coal-fired utility boilers. Given this background, the Environmental Protection Agency, the Gas Research Institute, the Electric Power Research Institute, the Pittsburgh Energy Technology Center, and the Ohio Coal Development Office sponsored a program led by ABB Combustion Engineering, Inc. (ABB-CE) to demonstrate reburning on a cyclone-fired boiler. Ohio Edison provided Unit No. 1 at their Niles Stationmore » for the reburn demonstration along with financial assistance. The Niles Unit No. 1 reburn system was started up in September 1990. This reburn program was the first full-scale reburn system demonstration in the US. This report describes work performed during the program. The work included a review of reburn technology, aerodynamic flow model testing of reburn system design concepts, design and construction of the reburn system, parametric performance testing, long-term load dispatch testing, and boiler tube wall thickness monitoring. The report also contains a description of the Niles No. 1 host unit, a discussion of conclusions and recommendations derived from the program, tabulation of data from parametric and long-term tests, and appendices which contain additional tabulated test results.« less

  13. Gas desorption and adsorption isotherm studies of coals in the Powder River basin, Wyoming and adjacent basins in Wyoming and North Dakota

    USGS Publications Warehouse

    Stricker, Gary D.; Flores, Romeo M.; McGarry, Dwain E.; Stillwell, Dean P.; Hoppe, Daniel J.; Stillwell, Cathy R.; Ochs, Alan M.; Ellis, Margaret S.; Osvald, Karl S.; Taylor, Sharon L.; Thorvaldson, Marjorie C.; Trippi, Michael H.; Grose, Sherry D.; Crockett, Fred J.; Shariff, Asghar J.

    2006-01-01

    The U.S. Geological Survey (USGS), in cooperation with the State Office, Reservoir Management Group (RMG), of the Bureau of Land Management (BLM) in Casper (Wyoming), investigated the coalbed methane resources (CBM) in the Powder River Basin, Wyoming and Montana, from 1999 to the present. Beginning in late 1999, the study also included the Williston Basin in Montana and North and South Dakota and Green River Basin and Big Horn Basin in Wyoming. The rapid development of CBM (referred to as coalbed natural gas by the BLM) during the early 1990s, and the lack of sufficient data for the BLM to fully assess and manage the resource in the Powder River Basin, in particular, gave impetus to the cooperative program. An integral part of the joint USGS-BLM project was the participation of 25 gas operators that entered individually into confidential agreements with the USGS, and whose cooperation was essential to the study. The arrangements were for the gas operators to drill and core coal-bed reservoirs at their cost, and for the USGS and BLM personnel to then desorb, analyze, and interpret the coal data with joint funding by the two agencies. Upon completion of analyses by the USGS, the data were to be shared with both the BLM and the gas operator that supplied the core, and then to be released or published 1 yr after the report was submitted to the operator.

  14. A review on the mechanism, risk evaluation, and prevention of coal spontaneous combustion in China.

    PubMed

    Kong, Biao; Li, Zenghua; Yang, Yongliang; Liu, Zhen; Yan, Daocheng

    2017-10-01

    In recent years, the ecology, security, and sustainable development of modern mines have become the theme of coal mine development worldwide. However, spontaneous combustion of coal under conditions of oxygen supply and automatic exothermic heating during coal mining lead to coalfield fires. Coal spontaneous combustion (CSC) causes huge economic losses and casualties, with the toxic and harmful gases produced during coal combustion not only polluting the working environment, but also causing great damage to the ecological environment. China is the world's largest coal producer and consumer; however, coal production in Chinese mines is seriously threatened by the CSC risk. Because deep underground mining methods are commonly adopted in Chinese coal mines, coupling disasters are frequent in these mines with the coalfield fires becoming increasingly serious. Therefore, in this study, we analyzed the development mechanism of CSC. The CSC risk assessment was performed from the aspects of prediction, detection, and determination of the "dangerous area" in a coal mine (i.e., the area most susceptible to fire hazards). A new geophysical method for CSC determination is proposed and analyzed. Furthermore, the main methods for CSC fire prevention and control and their advantages and disadvantages are analyzed. To eventually construct CSC prevention and control integration system, future developmental direction of CSC was given from five aspects. Our results can present a reference for the development of CSC fire prevention and control technology and promote the protection of ecological environment in China.

  15. Coal conversion processes and analysis methodologies for synthetic fuels production. [technology assessment and economic analysis of reactor design for coal gasification

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information to identify viable coal gasification and utilization technologies is presented. Analysis capabilities required to support design and implementation of coal based synthetic fuels complexes are identified. The potential market in the Southeast United States for coal based synthetic fuels is investigated. A requirements analysis to identify the types of modeling and analysis capabilities required to conduct and monitor coal gasification project designs is discussed. Models and methodologies to satisfy these requirements are identified and evaluated, and recommendations are developed. Requirements for development of technology and data needed to improve gasification feasibility and economies are examined.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nabeel, A.; Khan, M.A.; Husain, S.

    Coal is the most abundant source of energy. However, there is a need to develop cleaner, and more efficient, economical, and convenient coal conversion technologies. It is important to understand the organic chemical structure of coal for achieving real breakthroughs in the development of such coal conversion technologies. A novel computer-assisted modeling technique based on the analysis of {sup 13}C NMR and gel permeation chromatography has been applied to predict the average molecular structure of the acetylated product of a depolymerized bituminous Indian coal. The proposed molecular structure may be of practical use in understanding the mechanism of coal conversionsmore » during the processes of liquefaction, gasification, combustion, and carbonization.« less

  17. Fossil Energy organization restructured

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Department of Energy has restructured its fossil energy organization to accommodate increases in activity and visibility of the President's $2.5 billion clean coal technology initiative. The realignment also includes changes in the coal research and development program and in supporting staff functions. In the coal program, changes in the organization include the establishment of two associate deputy assistant secretaries, both reporting to the deputy Assistant Secretary for Coal Technology. One associate deputy assistant secretary will oversee the Clean Coal Technology Program. A second associate deputy assistant secretary will manage the coal research and development program. An organizational chart illustratesmore » the new fossil energy headquarters organization.« less

  18. Obtaining maps and data from the U.S. Geological Survey*

    USGS Publications Warehouse

    Hallam, C.A.

    1982-01-01

    The U.S. Geological Survey produces a variety of resource information for the United States. This includes many data bases of particular interest to planners such as land use and terrain information prepared by the National Mapping Division, water quantity and quality data collected by Water Resources Division, and coal resource information gathered by the Geologic Division. These data are stored in various forms, and information on their availability can be obtained from appropriate offices in the U.S. Geological Survey as well as from USGS Circular 777. These data have been used for the management, development, and monitoring of our Nation's resources by Federal, State, and local agencies. ?? 1982.

  19. Hardgrove grindability index and petrology used as an enhanced predictor of coal feed rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hower, J.C.

    1990-01-01

    An improved predictor of coal pulverization behavior and coal feed rate is under development at the CAER based upon the interaction between Hardgrove Grindability Index (HGI) and coal petrology. With educated attention, this interaction may be a useful tool to enhance coal feed rates if cautiously extended to the mining environment where blends of coal lithotypes are produced.

  20. 78 FR 14116 - Notice of Invitation to Participate; Coal Exploration License Application WYW181234, WY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Land Management, Interior. ACTION: Notice. SUMMARY: Pursuant to the Mineral Leasing Act of 1920, as... Rock Springs Rocket Miner once each week for 2 consecutive weeks beginning the week of March 4, 2013... State Office, 5353 Yellowstone Road, P.O. Box 1828, Cheyenne, WY 82003; and, BLM, Rock Springs Field...

Top