Activation of the E1 Ultra High Pressure Propulsion Test Facility at Stennis Space Center
NASA Technical Reports Server (NTRS)
Messer, Bradley; Messer, Elisabeth; Sewell, Dale; Sass, Jared; Lott, Jeff; Dutreix, Lionel, III
2001-01-01
After a decade of construction and a year of activation the El Ultra High Pressure Propulsion Test Facility at NASA's Stennis Space Center is fully operational. The El UHP Propulsion Test Facility is a multi-cell, multi-purpose component and engine test facility . The facility is capable of delivering cryogenic propellants at low, high, and ultra high pressures with flow rates ranging from a few pounds per second up to two thousand pounds per second. Facility activation is defined as a series of tasks required to transition between completion of construction and facility operational readiness. Activating the El UHP Propulsion Test Facility involved independent system checkouts, propellant system leak checks, fluid and gas sampling, gaseous system blow downs, pressurization and vent system checkouts, valve stability testing, valve tuning cryogenic cold flows, and functional readiness tests.
Advanced Gas Turbine (AGT) powertrain system
NASA Technical Reports Server (NTRS)
Helms, H. E.; Kaufeld, J.; Kordes, R.
1981-01-01
A 74.5 kW(100 hp) advanced automotive gas turbine engine is described. A design iteration to improve the weight and production cost associated with the original concept is discussed. Major rig tests included 15 hours of compressor testing to 80% design speed and the results are presented. Approximately 150 hours of cold flow testing showed duct loss to be less than the design goal. Combustor test results are presented for initial checkout tests. Turbine design and rig fabrication is discussed. From a materials study of six methods to fabricate rotors, two have been selected for further effort. A discussion of all six methods is given.
NASA Technical Reports Server (NTRS)
1973-01-01
The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.
LADEE Propulsion System Cold Flow Test
NASA Technical Reports Server (NTRS)
Williams, Jonathan Hunter; Chapman, Jack M.; Trinh, Hau, P.; Bell, James H.
2013-01-01
Lunar Atmosphere and Dust Environment Explorer (LADEE) is a NASA mission that will orbit the Moon. Its main objective is to characterize the atmosphere and lunar dust environment. The spacecraft development is being led by NASA Ames Research Center and scheduled for launch in 2013. The LADEE spacecraft will be operated with a bi-propellant hypergolic propulsion system using MMH and NTO as the fuel and oxidizer, respectively. The propulsion system utilizes flight-proven hardware on major components. The propulsion layout is composed of one 100-lbf main thruster and four 5-lbf RCS thrusters. The propellants are stored in four tanks (two parallel-connected tanks per propellant component). The propellants will be pressurized by regulated helium. A simulated propulsion system has been built for conducting cold flow test series to characterize the transient fluid flow of the propulsion system feed lines and to verify the critical operation modes, such as system priming, waterhammer, and crucial mission duty cycles. Propellant drainage differential between propellant tanks will also be assessed. Since the oxidizer feed line system has a higher flow demand than the fuel system does, the cold flow test focuses on the oxidizer system. The objective of the cold flow test is to simulate the LADEE propulsion fluid flow operation through water cold flow test and to obtain data for anchoring analytical models. The models will be used to predict the transient and steady state flow behaviors in the actual flight operations. The test activities, including the simulated propulsion test article, cold flow test, and analytical modeling, are being performed at NASA Marshall Space Flight Center. At the time of the abstract submission, the test article checkout is being performed. The test series will be completed by November, 2012
Checkout systems: Summary report for the universal control and display console
NASA Technical Reports Server (NTRS)
1971-01-01
The development of a unified test equipment checkout concept based on a universal control and display console system is discussed. The checkout requirements are analyzed for the shuttle and space station. Capability, size, utilization requirements and specifications of the ground checkout system are made on the basis of engineering trade-off studies. Recommendations related to the attainment of overall unified test equipment conceptual goals and objectives are submitted.
NASA Technical Reports Server (NTRS)
Kuo, K. K.; Hsieh, W. H.; Cheung, F. B.; Yang, A. S.; Brown, J. J.; Woodward, R. D.; Kline, M. C.; Burch, R. L.
1992-01-01
The objective was to achieve a better understanding of the combustion processes of liquid oxygen and gaseous hydrogen under broad range of pressure covering subcritical, critical, and supercritical conditions. The scope of the experimental work falls into the following areas: (1) design of the overall experimental setup; (2) modification of an existing windowed high pressure chamber; (3) design of the LOX feeding system; (4) provision of the safety features in the test rig design; (5) LOX cleanliness requirements; (6) cold shock testing; (7) implementation of data acquisition systems; (8) preliminary tests for system checkout; (9) modification of LOX feeding system; and (10) evaporation tests. Progress in each area is discussed.
A guide to onboard checkout. Volume 2: Environmental control and life support
NASA Technical Reports Server (NTRS)
1971-01-01
A description of space station equipment for environmental control and life support is presented. Reliability and maintenance procedures are reviewed. Failure analysis and checkout tests are discussed. The strategy for software checkout is noted.
NASA Technical Reports Server (NTRS)
Mikkelsen, Kevin L.; McDonald, Timothy J.; Saiyed, Naseem (Technical Monitor)
2001-01-01
This report presents the results of cold flow model tests to determine the static and wind tunnel performance of several NASA AST separate flow nozzle noise reduction configurations. The tests were conducted by Aero Systems Engineering, Inc., for NASA Glenn Research Center. The tests were performed in the Channels 14 and 6 static thrust stands and the Channel 10 transonic wind tunnel at the FluiDyne Aerodynamics Laboratory in Plymouth, Minnesota. Facility checkout tests were made using standard ASME long-radius metering nozzles. These tests demonstrated facility data accuracy at flow conditions similar to the model tests. Channel 14 static tests reported here consisted of 21 ASME nozzle facility checkout tests and 57 static model performance tests (including 22 at no charge). Fan nozzle pressure ratio varied from 1.4 to 2.0, and fan to core total pressure ratio varied from 1.0 to 1.19. Core to fan total temperature ratio was 1.0. Channel 10 wind tunnel tests consisted of 15 tests at Mach number 0.28 and 31 tests at Mach 0.8. The sting was checked out statically in Channel 6 before the wind tunnel tests. In the Channel 6 facility, 12 ASME nozzle data points were taken and 7 model data points were taken. In the wind tunnel, fan nozzle pressure ratio varied from 1.73 to 2.8, and fan to core total pressure ratio varied from 1.0 to 1.19. Core to fan total temperature ratio was 1.0. Test results include thrust coefficients, thrust vector angle, core and fan nozzle discharge coefficients, total pressure and temperature charging station profiles, and boat-tail static pressure distributions in the wind tunnel.
Healthy Checkout Lines: A Study in Urban Supermarkets.
Adjoian, Tamar; Dannefer, Rachel; Willingham, Craig; Brathwaite, Chantelle; Franklin, Sharraine
2017-09-01
To understand the impact of healthy checkouts in Bronx, New York City supermarkets. Consumer purchasing behavior was observed for 2 weeks in 2015. Three supermarkets in the South Bronx. A total of 2,131 adult shoppers (aged ≥18 years) who paid for their groceries at 1 of the selected study checkout lines. Two checkout lines were selected per store; 1 was converted to a healthy checkout and the other remained as it was (standard checkout). Data collectors observed consumer behavior at each line and recorded items purchased from checkout areas. Percentage of customers who purchase items from the checkout area; quantity and price of healthy and unhealthy items purchased from the healthy and standard checkout lines. Measures were analyzed by study condition using chi-square and t tests; significance was determined at α = .05. Only 4.0% of customers bought anything from the checkout area. A higher proportion of customers using the healthy vs standard checkout line bought healthy items (56.5% vs 20.5%; P < .001). When healthier products were available, the proportion of healthy purchases increased. Findings contribute to limited research on effectiveness of healthy checkouts in supermarkets. Similar interventions should expect an increase in healthy purchases from the checkout area, but limited overall impact. Copyright © 2017 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.
Comparison of Analytical Predictions and Experimental Results for a Dual Brayton Power System
NASA Technical Reports Server (NTRS)
Johnson, Paul
2007-01-01
NASA Glenn Research Center (GRC) contracted Barber- Nichols, Arvada, CO to construct a dual Brayton power conversion system for use as a hardware proof of concept and to validate results from a computational code known as the Closed Cycle System Simulation (CCSS). Initial checkout tests were performed at Barber- Nichols to ready the system for delivery to GRC. This presentation describes the system hardware components and lists the types of checkout tests performed along with a couple issues encountered while conducting the tests. A description of the CCSS model is also presented. The checkout tests did not focus on generating data, therefore, no test data or model analyses are presented.
NASA Technical Reports Server (NTRS)
Johnson, Paul K.
2007-01-01
NASA Glenn Research Center (GRC) contracted Barber-Nichols, Arvada, CO to construct a dual Brayton power conversion system for use as a hardware proof of concept and to validate results from a computational code known as the Closed Cycle System Simulation (CCSS). Initial checkout tests were performed at Barber- Nichols to ready the system for delivery to GRC. This presentation describes the system hardware components and lists the types of checkout tests performed along with a couple issues encountered while conducting the tests. A description of the CCSS model is also presented. The checkout tests did not focus on generating data, therefore, no test data or model analyses are presented.
Automation of checkout for the shuttle operations era
NASA Technical Reports Server (NTRS)
Anderson, J. A.; Hendrickson, K. O.
1985-01-01
The Space Shuttle checkout is different from its Apollo predecessor. The complexity of the hardware, the shortened turnaround time, and the software that performs ground checkout are outlined. Generating new techniques and standards for software development and the management structure to control it are implemented. The utilization of computer systems for vehicle testing is high lighted.
A guide to onboard checkout. Volume 1: Guidance, navigation and control
NASA Technical Reports Server (NTRS)
1971-01-01
The results are presented of a study of onboard checkout techniques, as they relate to space station subsystems, as a guide to those who may need to implement onboard checkout in similar subsystems. Guidance, navigation, and control subsystems, and their reliability and failure analyses are presented. Software and testing procedures are also given.
ATM test and integration. [Skylab Apollo Telescope Mount
NASA Technical Reports Server (NTRS)
Moore, J. W.; Mitchell, J. R.
1974-01-01
The test and checkout philosophy of the test program for the Skylab ATM module and the overall test flow including in-process, post-manufacturing, vibration, thermal vacuum, and prelaunch checkout activities are described. Capabilities and limitations of the test complex and its use of automation are discussed. Experiences with the organizational principle of using a dedicated test team for all checkout activities are reported. Material on the development of the ATM subsystems, the experimental program and the requirements of the scientific community, and the integration and verification of the complex systems/subsystems of the ATM are presented. The performance of the ATM test program in such areas as alignment, systems and subsystems, contamination control, and experiment operation is evaluated. The conclusions and recommendations resulting from the ATM test program are enumerated.
External tank processing from barge to pad
NASA Technical Reports Server (NTRS)
Carpenter, J. E.
1985-01-01
Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.
Armaments Coproduction at a Crossroads. U.S. Policy Options After the Cold War.
1993-04-01
Copro: $200 million ($132 million R&D; $68 million production) P Technology flowback : - -12 ECPs from NATO, I adopted by U.S. (rotary pump for...and future competition in the global defense marketplace. 0 Standard provisions for royalty-free technology flowback of all design changes...modifications, and improvements. -Some benefits in technology flowback reported by General Dynamics in learning Swiss digital system checkout techniques with
RHETT/EPDM Performance Characterization
NASA Technical Reports Server (NTRS)
Haag, T.; Osborn, M.
1998-01-01
The 0.6 kW Electric Propulsion Demonstration Module (EPDM) flight thruster system was tested in a large vacuum facility for performance measurements and functional checkout. The thruster was operated at a xenon flow rate of 3.01 mg/s, which was supplied through a self-contained propellant system. All power was provided through a flight-packaged power processing unit, which was mounted in vacuum on a cold plate. The thruster was cycled through 34 individual startup and shutdown sequences. Operating periods ranged from 3 to 3600 seconds. The system responded promptly to each command sequence and there were no involuntary shutdowns. Direct thrust measurements indicated that steady state thrust was temperature sensitive, and varied from a high of 41.7 mN at 16 C, to a low of 34.8 mN at 110 C. Short duration thruster firings showed rapid response and good repeatability.
140. VIEW OF CHECKOUT AREA (117), LSB (BLDG. 770), FROM ...
140. VIEW OF CHECKOUT AREA (117), LSB (BLDG. 770), FROM AGENA TRANSFER AREA SHELTER (117A). NITROGEN TEST PANEL ON EAST WALL OF AGENA TRANSFER AREA SHELTER (117A). - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Innovative Test Operations to Support Orion and Future Human Rated Missions
NASA Technical Reports Server (NTRS)
Koenig, William J.; Garcia, Rafael; Harris, Richard F.; See, Michael J.; Van Lear, Benjamin S.; Dobson, Jill M.; Norris, Scott Douglas
2017-01-01
This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.
NASA Technical Reports Server (NTRS)
Flanders, J. H.; Helmers, C. T.; Stanten, S. F.
1973-01-01
The relationship is examined between the space shuttle onboard avionics and the ground test computer language GOAL when used in the onboard computers. The study is aimed at providing system analysis support to the feasibility analysis of a GOAL to HAL translator, where HAL is the language used to program the onboard computers for flight. The subject is dealt with in three aspects. First, the system configuration at checkout, the general checkout and launch sequences, and the inventory of subsystems are described. Secondly, the hierarchic organization of onboard software and different ways of introducing GOAL-derived software onboard are described. Also the flow of commands and test data during checkout is diagrammed. Finally, possible impact of error detection and redundancy management on the GOAL language is discussed.
Mariner Mars 1971 science operational support equipment
NASA Technical Reports Server (NTRS)
1971-01-01
The Mariner Mars 1971 science operational support equipment (SOSE) was developed to support the checkout of the proof test model and flight spacecraft. The test objectives of the SOSE and how these objectives were implemented are discussed. Attention is focused on the computer portion of the SOSE, since incorporation of a computer in ground checkout equipment represents a major departure from the support equipment concepts previously used. A functional description of the major hardware elements contained in the SOSE is also included, along with the operational performance of the SOSE during spacecraft testing.
Skylab checkout operations. [from multiple docking adapter contractor viewpoint
NASA Technical Reports Server (NTRS)
Timmons, K. P.
1973-01-01
The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.
NASA Technical Reports Server (NTRS)
Mitchell, T. R.
1974-01-01
The development of a test engineer oriented language has been under way at the Kennedy Space Center for several years. The result of this effort is the Ground Operations Aerospace Language, GOAL, a self-documenting, high-order language suitable for coding automatic test, checkout and launch procedures. GOAL is a highly readable, writable, retainable language that is easily learned by nonprogramming oriented engineers. It is sufficiently powerful for use at all levels of Space Shuttle ground processing, from line replaceable unit checkout to integrated launch day operations. This paper will relate the language development, and describe GOAL and its applications.
Firing Room Remote Application Software Development
NASA Technical Reports Server (NTRS)
Liu, Kan
2015-01-01
The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.
Using IoT Device Technology in Spacecraft Checkout Systems
NASA Astrophysics Data System (ADS)
Plummer, Chris
2015-09-01
The Internet of Things (IoT) has become a common theme in both the technical and popular press in recent years because many of the enabling technologies that are required to make IoT a reality have now matured. Those technologies are revolutionising the way industrial systems and products are developed because they offer significant advantages over older technologies. This paper looks at how IoT device technology can be used in spacecraft checkout systems to achieve smaller, more capable, and more scalable solutions than are currently available. It covers the use of IoT device technology for classical spacecraft test systems as well as for hardware-in-the-loop simulation systems used to support spacecraft checkout.
Testing and checkout experiences in the National Transonic Facility since becoming operational
NASA Technical Reports Server (NTRS)
Bruce, W. E., Jr.; Gloss, B. B.; Mckinney, L. W.
1988-01-01
The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.
Current status and some future test directions for the U.S. National Transonic Facility
NASA Technical Reports Server (NTRS)
Gloss, Blair B.
1992-01-01
The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of the tunnel systems were performed over the following two years. In August 1984, the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamics calibration and testing to commence. Since 1984 several operational problems have been identified and successfully solved which is demonstrated by the fact that the facility has operated the last year with no significant facility down times. Also during this time period, development of test techniques and instrumentation has continued. This paper will review some of the recent test techniques and instrumentation developments, and will briefly review the status of the facility.
Autonomous Soaring 2005 Flight Data Summary
NASA Technical Reports Server (NTRS)
Allen, Michael J.
2006-01-01
Flight testing of the 14ft span CloudSwift UAV was conducted during the summer of 2005. Test maneuvers included aircraft checkout, Piccolo gain tuning, FTS range tests, and thermal soaring research flights.
Design and Checkout of a High Speed Research Nozzle Evaluation Rig
NASA Technical Reports Server (NTRS)
Castner, Raymond S.; Wolter, John D.
1997-01-01
The High Flow Jet Exit Rig (HFJER) was designed to provide simulated mixed flow turbojet engine exhaust for one- seventh scale models of advanced High Speed Research test nozzles. The new rig was designed to be used at NASA Lewis Research Center in the Nozzle Acoustic Test Rig and the 8x6 Supersonic Wind Tunnel. Capabilities were also designed to collect nozzle thrust measurement, aerodynamic measurements, and acoustic measurements when installed at the Nozzle Acoustic Test Rig. Simulated engine exhaust can be supplied from a high pressure air source at 33 pounds of air per second at 530 degrees Rankine and nozzle pressure ratios of 4.0. In addition, a combustion unit was designed from a J-58 aircraft engine burner to provide 20 pounds of air per second at 2000 degrees Rankine, also at nozzle pressure ratios of 4.0. These airflow capacities were designed to test High Speed Research nozzles with exhaust areas from eighteen square inches to twenty-two square inches. Nozzle inlet flow measurement is available through pressure and temperature sensors installed in the rig. Research instrumentation on High Speed Research nozzles is available with a maximum of 200 individual pressure and 100 individual temperature measurements. Checkout testing was performed in May 1997 with a 22 square inch ASME long radius flow nozzle. Checkout test results will be summarized and compared to the stated design goals.
NASA Technical Reports Server (NTRS)
Panek, Joseph W.
2001-01-01
The proper operation of the Electronically Scanned Pressure (ESP) System critical to accomplish the following goals: acquisition of highly accurate pressure data for the development of aerospace and commercial aviation systems and continuous confirmation of data quality to avoid costly, unplanned, repeat wind tunnel or turbine testing. Standard automated setup and checkout routines are necessary to accomplish these goals. Data verification and integrity checks occur at three distinct stages, pretest pressure tubing and system checkouts, daily system validation and in-test confirmation of critical system parameters. This paper will give an overview of the existing hardware, software and methods used to validate data integrity.
Launch Processing System. [for Space Shuttle
NASA Technical Reports Server (NTRS)
Byrne, F.; Doolittle, G. V.; Hockenberger, R. W.
1976-01-01
This paper presents a functional description of the Launch Processing System, which provides automatic ground checkout and control of the Space Shuttle launch site and airborne systems, with emphasis placed on the Checkout, Control, and Monitor Subsystem. Hardware and software modular design concepts for the distributed computer system are reviewed relative to performing system tests, launch operations control, and status monitoring during ground operations. The communication network design, which uses a Common Data Buffer interface to all computers to allow computer-to-computer communication, is discussed in detail.
Thermal Performance of LANDSAT-7 ETM+ Instruments During First Year in Flight
NASA Technical Reports Server (NTRS)
Choi, Michael K.
2000-01-01
Landsat-7 was successfully launched into orbit on April 15, 1999. After devoting three months to the t bakeout and cool-down of the radiative cooler, and on- t orbit checkout, the Enhanced Thematic Mapper Plus (ETM+) began the normal imaging phase of the mission in mid-July 1999. This paper presents the thermal performance of the ETM+ from mid-July 1999 to mid-May 2000. The flight temperatures are compared to the yellow temperature limits, and worst cold case and worst hot case flight temperature predictions in the 15-orbit mission design profile. The flight temperature predictions were generated by a thermal model, which was correlated to the observatory thermal balance test data. The yellow temperature limits were derived from the flight temperature predictions, plus some margins. The yellow limits work well in flight, so that only several minor changes to them were needed. Overall, the flight temperatures and flight temperature predictions have good agreement. Based on the ETM+ thermal vacuum qualification test, new limits on the imaging time are proposed to increase the average duty cycle, and to resolve the problems experienced by the Mission Operation Team.
Application of a space station to communications satellites
NASA Technical Reports Server (NTRS)
Ramler, J. R.
1983-01-01
The economic benefits of a space station relative to communications satellites are discussed in terms of technology experiments, spacecraft checkout, repair, servicing, and refurbishment (RSR), and mating an OTV with satellites for boost to GEO. The zero gravity, vacuum conditions, and atmosphere free long ranges are environmental features that can be used for testing large, flexible antennas and laser communications devices. Some resistance might be encountered to checkout in LEO due to the substantial success of launches to GEO without LEO checkout. However, new generations of larger, more complex satellites may warrant the presence of a space station to verify performance of new spacecraft. One RSR positive aspect for a space station is as a storage site for propellant, as well as for reusable OTV booster engines. Also, the space station can serve as a base for manned or unmanned repair spacecraft which will travel to GEO to fix malfunctions in geostationary satellites.
Spacelab-Mir Module Lift in Operations and Checkout Building,
NASA Technical Reports Server (NTRS)
1995-01-01
The STS-71 Spacelab-Mir module is lifted by overhead crane from a test stand in the Operations and Checkout (O&C) Building after final checkout work is completed by the KSC payload processing team. the module will be integrated into the payload bay of the Space Shuttle orbiter Atlantis. During the 11-day mission, the module will serve as an orbital medical laboratory where joint U.S.-Russian investigations will be conducted on the physiological effects of long-duration spaceflight. Also on board Atlantis will be the Orbiter Docking System (ODS) that will permit the link-up of Atlantis and the Russian Mir Space Station. STS-71 is the first of seven planned docking missions. The Spacelab-Mir also carries supplies for the two Russian Mir 19 crew members who will liftoff as a part of the STS-71 crew and later transfer into the space station.
Skylab SO71/SO72 circadian periodicity experiment. [experimental design and checkout of hardware
NASA Technical Reports Server (NTRS)
Fairchild, M. K.; Hartmann, R. A.
1973-01-01
The circadian rhythm hardware activities from 1965 through 1973 are considered. A brief history of the programs leading to the development of the combined Skylab SO71/SO72 Circadian Periodicity Experiment (CPE) is given. SO71 is the Skylab experiment number designating the pocket mouse circadian experiment, and SO72 designates the vinegar gnat circadian experiment. Final design modifications and checkout of the CPE, integration testing with the Apollo service module CSM 117 and the launch preparation and support tasks at Kennedy Space Center are reported.
2012-02-17
Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA
Parallel Eclipse Project Checkout
NASA Technical Reports Server (NTRS)
Crockett, Thomas M.; Joswig, Joseph C.; Shams, Khawaja S.; Powell, Mark W.; Bachmann, Andrew G.
2011-01-01
Parallel Eclipse Project Checkout (PEPC) is a program written to leverage parallelism and to automate the checkout process of plug-ins created in Eclipse RCP (Rich Client Platform). Eclipse plug-ins can be aggregated in a feature project. This innovation digests a feature description (xml file) and automatically checks out all of the plug-ins listed in the feature. This resolves the issue of manually checking out each plug-in required to work on the project. To minimize the amount of time necessary to checkout the plug-ins, this program makes the plug-in checkouts parallel. After parsing the feature, a request to checkout for each plug-in in the feature has been inserted. These requests are handled by a thread pool with a configurable number of threads. By checking out the plug-ins in parallel, the checkout process is streamlined before getting started on the project. For instance, projects that took 30 minutes to checkout now take less than 5 minutes. The effect is especially clear on a Mac, which has a network monitor displaying the bandwidth use. When running the client from a developer s home, the checkout process now saturates the bandwidth in order to get all the plug-ins checked out as fast as possible. For comparison, a checkout process that ranged from 8-200 Kbps from a developer s home is now able to saturate a pipe of 1.3 Mbps, resulting in significantly faster checkouts. Eclipse IDE (integrated development environment) tries to build a project as soon as it is downloaded. As part of another optimization, this innovation programmatically tells Eclipse to stop building while checkouts are happening, which dramatically reduces lock contention and enables plug-ins to continue downloading until all of them finish. Furthermore, the software re-enables automatic building, and forces Eclipse to do a clean build once it finishes checking out all of the plug-ins. This software is fully generic and does not contain any NASA-specific code. It can be applied to any Eclipse-based repository with a similar structure. It also can apply build parameters and preferences automatically at the end of the checkout.
NASA Astrophysics Data System (ADS)
Sen, Amit; Caruso, Daniel; Durham, David; Falcon, Carlos
2011-11-01
The Aquarius/SAC-D observatory was launch in June 2011 from Vandenberg Air Force Base (VAFB), in California, USA. This mission is the fourth joint earth-observation endeavor between NASA and CONAE. The primary objective of the Aquarius/SAC-D mission is to investigate the links between global water cycle, ocean circulation and climate by measuring Sea Surface Salinity (SSS). Over the last year, the observatory successfully completed system level environmental and functional testing at INPE, Brazil and was transported to VAFB for launch operations. This paper will present the challenges of this mission, the system, the preparation of the spacecraft, instruments, testing, launch, inorbit checkout and commissioning of this Observatory in space.
30 CFR 57.11058 - Check-in, check-out system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...
30 CFR 57.11058 - Check-in, check-out system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...
30 CFR 57.11058 - Check-in, check-out system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...
30 CFR 57.11058 - Check-in, check-out system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...
30 CFR 57.11058 - Check-in, check-out system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...
NASA Technical Reports Server (NTRS)
Gentz, Steven J.; Rotter, Hank A.; Easton, Myriam; Lince, Jeffrey; Park, Woonsup; Stewart, Thomas; Speckman, Donna; Dexter, Stephen; Kelly, Robert
2005-01-01
The Internal Active Thermal Control System (IATCS) coolant exhibited unexpected chemical changes during the first year of on-orbit operation following the launch and activation in February 2001. The coolant pH dropped from 9.3 to below the minimum specification limit of 9.0, and re-equilibrated between 8.3 and 8.5. This drop in coolant pH was shown to be the result of permeation of CO2 from the cabin into the coolant via Teflon flexible hoses which created carbonic acid in the fluid. This unexpected diffusion was the result of having a cabin CO2 partial pressure higher than the ground partial pressure (average 4.0 mmHg vs. less than 0.2 mmHg). This drop in pH was followed by a concurrent increasing coolant nickel concentration. No other metal ions were observed in the coolant and based on previous tests, the source of nickel ion was thought to be the boron nickel (BNi) braze intermetallics used in the construction of HXs and cold plates. Specifically, BNi2 braze alloy was used for the IATCS IFHX and BNi3 braze alloy was used for the IATCS Airlock Servicing and Performance Checkout Unit (SPCU) HX and cold plates. Given the failure criticality of the HXs, a Corrosion Team was established by the IATCS CWG to determine the impact of the nickel corrosion on hardware performance life.
Space Shuttle Avionics: a Redundant IMU On-Board Checkout and Redundancy Management System
NASA Technical Reports Server (NTRS)
Mckern, R. A.; Brown, D. G.; Dove, D. W.; Gilmore, J. P.; Landey, M. E.; Musoff, H.; Amand, J. S.; Vincent, K. T., Jr.
1972-01-01
A failure detection and isolation philosophy applicable to multiple off-the-shelf gimbaled IMUs are discussed. The equations developed are implemented and evaluated with actual shuttle trajectory simulations. The results of these simulations are presented for both powered and unpowered flight phases and at operational levels of four, three, and two IMUs. A multiple system checkout philosophy is developed and simulation results presented. The final task develops a laboratory test plan and defines the hardware and software requirements to implement an actual multiple system and evaluate the interim study results for space shuttle application.
Space shuttle propulsion systems on-board checkout and monitoring system development study
NASA Technical Reports Server (NTRS)
1971-01-01
Investigations on the fundamental space shuttle propulsion systems program are reported, with emphasis on in-depth reviews of preliminary drafts of the guidelines. The guidelines will be used to incorporate the onboard checkout and monitoring function into the basic design of the propulsion systems and associated interfacing systems. The analysis of checkout and monitoring requirements of the Titan 3 L expandable booster propulsion systems was completed, and the techniques for accomplishing the checkout and monitoring functions were determined. Updating results of the basic study of propulsion system checkout and monitoring is continuing.
Design and Operation of a Fast, Thin-Film Thermocouple Probe on a Turbine Engine
NASA Technical Reports Server (NTRS)
Meredith, Roger D.; Wrbanek, John D.; Fralick, Gustave C.; Greer, Lawrence C., III; Hunter, Gary W.; Chen, Liang-Yu
2014-01-01
As a demonstration of technology maturation, a thin-film temperature sensor probe was fabricated and installed on a F117 turbofan engine via a borescope access port to monitor the temperature experienced in the bleed air passage of the compressor area during an engine checkout test run. To withstand the harsh conditions experienced in this environment, the sensor probe was built from high temperature materials. The thin-film thermocouple sensing elements were deposited by physical vapor deposition using pure metal elements, thus avoiding the inconsistencies of sputter-depositing particular percentages of materials to form standardized alloys commonly found in thermocouples. The sensor probe and assembly were subjected to a strict protocol of multi-axis vibrational testing as well as elevated temperature pressure testing to be qualified for this application. The thin-film thermocouple probe demonstrated a faster response than a traditional embedded thermocouple during the engine checkout run.
Mechanical systems readiness assessment and performance monitoring study
NASA Technical Reports Server (NTRS)
1972-01-01
The problem of mechanical devices which lack the real-time readiness assessment and performance monitoring capability required for future space missions is studied. The results of a test program to establish the feasibility of implementing structure borne acoustics, a nondestructive test technique, are described. The program included the monitoring of operational acoustic signatures of five separate mechanical components, each possessing distinct sound characteristics. Acoustic signatures were established for normal operation of each component. Critical failure modes were then inserted into the test components, and faulted acoustic signatures obtained. Predominant features of the sound signature were related back to operational events occurring within the components both for normal and failure mode operations. All of these steps can be automated. The structure borne acoustics technique lends itself to reducing checkout time, simplifying maintenance procedures, and reducing manual involvement in the checkout, operation, maintenance, and fault diagnosis of mechanical systems.
Communications systems checkout study
NASA Technical Reports Server (NTRS)
Ginter, W. G.
1972-01-01
The results and conclusions of an engineering study of Space Station communications subsystem checkout are reported. The primary purpose of the study is to recommend specific guidelines and constraints for the design and utilization of the communications subsystem leading to a practical and effective means of onboard checkout implementation. Major study objectives are as follows: (1) identify candidate communications subsystem checkout concepts, (2) determine implementation impacts of feasible concepts, (3) evaluate practicality and effectiveness of alternative concepts, (4) propose baseline modifications to accommodate preferred concepts, and (5) recommend areas for additional investigation. In addition, study results are interpreted, where appropriate, in terms of their applicability to checkout of Shuttle-Orbiter communications subsystem.
Digital computer technique for setup and checkout of an analog computer
NASA Technical Reports Server (NTRS)
Ambaruch, R.
1968-01-01
Computer program technique, called Analog Computer Check-Out Routine Digitally /ACCORD/, generates complete setup and checkout data for an analog computer. In addition, the correctness of the analog program implementation is validated.
2012-04-20
CAPE CANAVERAL, Fla. – The van transporting the cargo bag packed with NanoRacks-CubeLabs Module-9 experiments, arrives at Space Launch Complex-40 on Cape Canaveral Air Force Station in Florida for cold stowage. The bag will be loaded into the Space Exploration Technologies Dragon capsule in preparation for its scheduled April 30 liftoff aboard a Falcon 9 rocket. NanoRacks-CubeLabs Module-9 uses a two-cube unit box for student competition investigations using 15 liquid mixing tube assemblies that function similar to commercial glow sticks. The investigations range from microbial growth to water purification in microgravity. Known as SpaceX, the launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the module and other cargo will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two private companies to launch cargo safely to the station. For more information, visit http://www.nasa.gov/spacex. Photo credit: NASA/Jim Grossmann
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower
1966-05-25
An Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower (LUT) atop a crawler-transporter move from the Vehicle Assembly Building (VAB) on the way to Pad A. This test vehicle, designated the Apollo/Saturn 500-F, is being used to verify launch facilities, train launch crews, and develop test and checkout procedures.
Orion Crew Module Structural Test Article Arrival
2016-11-14
NASA’s Super Guppy aircraft touches down at the Shuttle Landing Facility at the agency’s Kennedy Space Center in Florida, carrying the Orion crew module structural test article (STA). The STA will be offloaded and transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. Photo credit: NASA/Kim Shiflett
On-orbit checkout of satellites, volume 2. Part 3 of on-orbit checkout study. [space maintenance
NASA Technical Reports Server (NTRS)
Pritchard, E. I.
1978-01-01
Early satellite failures significantly degrading satellite operations are reviewed with emphasis on LANDSAT D, the Technology Demonstration Satellite, the ATREX/AEM spacecraft, STORMSAT 2, and the synchronous meteorological satellite. Candidates for correction with on-orbit checkout and appropriate actions are analyzed. On-orbit checkout subsystem level studies are summarized for electrical power, attitude control, thermal control, reaction control and propulsion, instruments, and angular rate matching for alignment of satellite IRU.
Shiu, Henry; Swales, Henry; Van Damn, Case
2015-06-03
Dataset contains MHK Hydrofoils Design and Optimization and CFD Analysis Report for the Aquantis 2.5 MW Ocean Current Generation Device, as well as MHK Hydrofoils Wind Tunnel Test Plan and Checkout Test Report.
NASA Technical Reports Server (NTRS)
Gates, R. M.; Williams, J. E.
1974-01-01
Results are given of analytical studies performed in support of the design, implementation, checkout and use of NASA's dynamic docking test system (DDTS). Included are analyses of simulator components, a list of detailed operational test procedures, a summary of simulator performance, and an analysis and comparison of docking dynamics and loads obtained by test and analysis.
Novel Airborne Imaging Polarimeter Undergoes High-Altitude Flight Testing
NASA Technical Reports Server (NTRS)
Diner, David J.; Pingree, Paula J.; Chipman, Russell A.
2015-01-01
Optical and signal processing technologies for high-accuracy polarimetric imaging, aimed at studying the impact of atmospheric haze and clouds on Earth's climate, have been demonstrated on checkout flights aboard NASA's ER-2 aircraft.
The US National Transonic Facility, NTF
NASA Technical Reports Server (NTRS)
Bruce, Walter E., Jr.; Gloss, Blair B.
1989-01-01
The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of tunnel systems were performed over the next two years. In August 1984, the Operational Readiness Review (ORR) was conducted and the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamic calibration and testing to commence. Also, the model access system for the cryogenic mode of operation would be placed into operation along with tunnel testing. Since the ORR, a host of operating problems resulting from the cryogenic environment were identified and solved. These range from making mechanical and electrical systems functional to eliminating temperature induced model vibration to coping with the outgassing of moisture from the thermal insulation. Additionally, a series of aerodynamic tests have demonstrated data quality and provided research data on several configurations. Some of the more significant efforts are reviewed since the ORR and the NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality are summarized.
Alternative Approach to Vehicle Element Processing
NASA Technical Reports Server (NTRS)
Huether, Jacob E.; Otto, Albert E.
1995-01-01
The National Space Transportation Policy (NSTP), describes the challenge facing today's aerospace industry. 'Assuring reliable and affordable access to space through U.S. space transportation capabilities is a fundamental goal of the U.S. space program'. Experience from the Space Shuttle Program (SSP) tells us that launch and mission operations are responsible for approximately 45 % of the cost of each shuttle mission. Reducing these costs is critical to NSTP goals in the next generation launch vehicle. Based on this, an innovative alternative approach to vehicle element processing was developed with an emphasis on reduced launch costs. State-of-the-art upgrades to the launch processing system (LPS) will enhance vehicle ground operations. To carry this one step further, these upgrade could be implemented at various vehicle element manufacturing sites to ensure system compatibility between the manufacturing facility and the launch site. Design center vehicle stand alone testing will ensure system integrity resulting in minimized checkout and testing at the launch site. This paper will addresses vehicle test requirements, timelines and ground checkout procedures which enable concept implementation.
Electronic device simulates respiration rate and depth
NASA Technical Reports Server (NTRS)
Thomas, J. A.
1964-01-01
An oscillator circuit and a thermistor, in close proximity to a light bulb, periodically alter the heat output of the bulb by varying the voltage across its filament. Use of this simulator permits checkout tests on pneumographs.
Undergraduate Library Collection Use and Diversity: Testing for Racial and Gender Differences
ERIC Educational Resources Information Center
Herrera, Gail
2016-01-01
This study examined gender and racial differences among undergraduate library collection users at the University of Mississippi. Checkout and electronic resource use data were compiled for the calendar year 2014. These data were used along with statistical testing to distinguish between groups and determine how well the library collection was…
Ground Operations Aerospace Language (GOAL)
NASA Technical Reports Server (NTRS)
1973-01-01
GOAL, is a test engineer oriented language designed to be used to standardize procedure terminology and as the test programming language to be used for ground checkout operations in a space vehicle launch environment. The material presented concerning GOAL includes: (1) a historical review, (2) development objectives and requirements, (3) language scope and format, and (4) language capabilities.
Orion Crew Module Structural Test Article Arrival
2016-11-14
NASA’s Super Guppy aircraft arrives on the tarmac after touching down at the Shuttle Landing Facility at the agency’s Kennedy Space Center in Florida. The guppy is carrying the Orion crew module structural test article (STA). The STA will be offloaded and transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. Photo credit: NASA/Kim Shiflett
39. View of checkout indicator computer console for DR beams, ...
39. View of checkout indicator computer console for DR beams, TR chains, and special checkout target control located in CSMR in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
NASA Technical Reports Server (NTRS)
Taube, L. J.
1972-01-01
This volume contains cost, schedule, and technical information on the following B-70 aircraft subsystems: air induction system, flight control, personnel accommodation and escape, alighting and arresting, mission and traffic control, flight indication, test instrumentation, and installation, checkout, and pre-flight.
2012-04-20
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA’s Kennedy Space Center in Florida, a cargo bag packed with NanoRacks-CubeLabs Module-9 experiments is weighed before it is transported to Space Launch Complex-40 on nearby Cape Canaveral Air Force Station for cold stowage. There, the bag will be loaded into the Space Exploration Technologies Dragon capsule in preparation for its scheduled April 30 liftoff aboard a Falcon 9 rocket. NanoRacks-CubeLabs Module-9 uses a two-cube unit box for student competition investigations using 15 liquid mixing tube assemblies that function similar to commercial glow sticks. The investigations range from microbial growth to water purification in microgravity. Known as SpaceX, the launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the module and other cargo will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two private companies to launch cargo safely to the station. For more information, visit http://www.nasa.gov/spacex. Photo credit: NASA/Jim Grossmann
Winkler, Lise L; Christensen, Ulla; Glümer, Charlotte; Bloch, Paul; Mikkelsen, Bent E; Wansink, Brian; Toft, Ulla
2016-11-22
The widespread use of in-store marketing strategies to induce unhealthy impulsive purchases has implications for shopping experience, food choice and possibly adverse health outcomes. The aim of this study was to examine consumer attitudes and evaluate sales effects of a healthy checkout supermarket intervention. The study was part of Project Sundhed & Lokalsamfund (Project SoL); a Danish participatory community-based health promotion intervention. Consumer attitudes towards unhealthy snack exposure in supermarkets were examined in a qualitative pre-intervention study (29 short in-store interviews, 11 semi-structured interviews and three focus group interviews). Findings were presented to food retailers and informed the decision to test a healthy checkout intervention. Sugar confectionery at one checkout counter was substituted with fruit and healthy snacking items in four stores for 4 weeks. The intervention was evaluated by 48 short exit interviews on consumer perceptions of the intervention and by linear mixed model analyses of supermarket sales data from the intervention area and a matched control area. The qualitative pre-intervention study identified consumer concern and annoyance with placement and promotion of unhealthy snacks in local stores. Store managers were willing to respond to local consumer concern and a healthy checkout intervention was therefore implemented. Exit interviews found positive attitudes towards the intervention, while intervention awareness was modest. Most participants believed that the intervention could help other consumers make healthier choices, while fewer expected to be influenced by the intervention themselves. Statistical analyses suggested an intervention effect on sales of carrot snack packs when compared with sales before the intervention in Bornholm control stores (P < 0.05). No significant intervention effect on sales of other intervention items or sugar confectionery was found. The present study finds that the healthy checkout intervention was positively evaluated by consumers and provided a 'responsible' branding opportunity for supermarkets, thus representing a win-win strategy for store managers and consumers in the short term. However, the intervention was too modest to draw conclusions on long-term sales and health implications of this initiative. More research is needed to assess whether retailer-researcher collaborations on health promotion can be a winning strategy for public health.
Use of the Marshall Space Flight Center solar simulator in collector performance evaluation
NASA Technical Reports Server (NTRS)
Humphries, W. R.
1978-01-01
Actual measured values from simulator checkout tests are detailed. Problems encountered during initial startup are discussed and solutions described. Techniques utilized to evaluate collector performance from simulator test data are given. Performance data generated in the simulator are compared to equivalent data generated during natural outdoor testing. Finally, a summary of collector performance parameters generated to date as a result of simulator testing are given.
Evolution of solid rocket booster component testing
NASA Technical Reports Server (NTRS)
Lessey, Joseph A.
1989-01-01
The evolution of one of the new generation of test sets developed for the Solid Rocket Booster of the U.S. Space Transportation System. Requirements leading to factory checkout of the test set are explained, including the evolution from manual to semiautomated toward fully automated status. Individual improvements in the built-in test equipment, self-calibration, and software flexibility are addressed, and the insertion of fault detection to improve reliability is discussed.
ERIC Educational Resources Information Center
Ross, Scott W.; Sabey, Christian V.
2015-01-01
Check-In Check-Out is a Tier 2 intervention designed to reduce problem behavior and increase prosocial behavior. Although the intervention has demonstrated effects in several studies, few research efforts have considered how the intervention can be modified to support students with social skill deficits. Through a multiple baseline design across…
Horsley, Jason A; Absalom, Katie Ar; Akiens, Evie M; Dunk, Robert J; Ferguson, Alice M
2014-11-01
To investigate the proportion of foods that are unhealthy to which children are exposed at the checkout of convenience supermarkets. We performed a cross-sectional survey of foodstuffs displayed at the checkout. Products displayed at or below children's eye-level were designated as healthy, unhealthy or unclassifiable using the Food Standards Agency's scoring criteria. Thirteen convenience supermarkets from the three leading UK supermarket chains were selected on the basis of proximity to the town hall in Sheffield, England. Convenience supermarkets were defined as branches of supermarket chains that were identified as being other than superstores on their company's store locator website. In almost all of the convenience supermarkets surveyed, the main healthy product on display was sugar-free chewing gum. On average, when chewing gum was not included as a foodstuff, 89% of the products on display at the checkouts of convenience supermarkets were unhealthy using the Food Standards Agency's criteria. One store was a notable outlier, providing only fruit and nuts at its checkout. The overwhelming majority of products to which children are exposed at the convenience supermarket checkout are unhealthy. This is despite all the supermarket chains surveyed having signed up to the UK Government's 'responsibility deal'.
2017-02-27
Quiet Supersonic Technology (QueSST) X-plane in the 8x6 Supersonic Wind Tunnel at NASA Glenn Research Center. This time-lapse shows the model support structure buildup and balance checkout as well as the installation of the model in the test section.
Bench Checkout of InSight's Seismometer Instrument
2017-08-28
The Seismic Experiment for Interior Structure (SEIS) instrument for NASA's InSight mission to Mars undergoes a checkout for the spacecraft's assembly, test and launch operations (ATLO) in this photo taken July 20, 2017, in a Lockheed Martin clean room facility in Littleton, Colorado. The SEIS was provided by France's national space agency (CNES) with collaboration from the United States, the United Kingdom, Switzerland and Germany. The InSight mission (for Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) is scheduled to launch in May 2018 and land on Mars Nov. 26, 2018. It will investigate processes that formed and shaped Mars and will help scientists better understand the evolution of our inner solar system's rocky planets, including Earth. https://photojournal.jpl.nasa.gov/catalog/PIA21846
Simulation verification techniques study
NASA Technical Reports Server (NTRS)
Schoonmaker, P. B.; Wenglinski, T. H.
1975-01-01
Results are summarized of the simulation verification techniques study which consisted of two tasks: to develop techniques for simulator hardware checkout and to develop techniques for simulation performance verification (validation). The hardware verification task involved definition of simulation hardware (hardware units and integrated simulator configurations), survey of current hardware self-test techniques, and definition of hardware and software techniques for checkout of simulator subsystems. The performance verification task included definition of simulation performance parameters (and critical performance parameters), definition of methods for establishing standards of performance (sources of reference data or validation), and definition of methods for validating performance. Both major tasks included definition of verification software and assessment of verification data base impact. An annotated bibliography of all documents generated during this study is provided.
Get out of Fines Free: Recruiting Student Usability Testers via Fine Waivers
ERIC Educational Resources Information Center
Hockenberry, Benjamin; Blackburn, Kourtney
2016-01-01
St. John Fisher College's Lavery Library's Access Services and Systems departments began a pilot project in which students with overdue fines tested usability of library Web sites in exchange for fine waivers. Circulation staff promoted the program and redeemed fine waiver vouchers at the Checkout Desk, while Systems staff administered testing and…
PDSS/IMC requirements and functional specifications
NASA Technical Reports Server (NTRS)
1983-01-01
The system (software and hardware) requirements for the Payload Development Support System (PDSS)/Image Motion Compensator (IMC) are provided. The PDSS/IMC system provides the capability for performing Image Motion Compensator Electronics (IMCE) flight software test, checkout, and verification and provides the capability for monitoring the IMC flight computer system during qualification testing for fault detection and fault isolation.
Testing methods and techniques: Testing electrical and electronic devices: A compilation
NASA Technical Reports Server (NTRS)
1972-01-01
The methods, techniques, and devices used in testing various electrical and electronic apparatus are presented. The items described range from semiconductor package leak detectors to automatic circuit analyzer and antenna simulators for system checkout. In many cases the approaches can result in considerable cost savings and improved quality control. The testing of various electronic components, assemblies, and systems; the testing of various electrical devices; and the testing of cables and connectors are explained.
Scanning-time evaluation of Digimarc Barcode
NASA Astrophysics Data System (ADS)
Gerlach, Rebecca; Pinard, Dan; Weaver, Matt; Alattar, Adnan
2015-03-01
This paper presents a speed comparison between the use of Digimarc® Barcodes and the Universal Product Code (UPC) for customer checkout at point of sale (POS). The recently introduced Digimarc Barcode promises to increase the speed of scanning packaged goods at POS. When this increase is exploited by workforce optimization systems, the retail industry could potentially save billions of dollars. The Digimarc Barcode is based on Digimarc's watermarking technology, and it is imperceptible, very robust, and does not require any special ink, material, or printing processes. Using an image-based scanner, a checker can quickly scan consumer packaged goods (CPG) embedded with the Digimarc Barcode without the need to reorient the packages with respect to the scanner. Faster scanning of packages saves money and enhances customer satisfaction. It reduces the length of the queues at checkout, reduces the cost of cashier labor, and makes self-checkout more convenient. This paper quantifies the increase in POS scanning rates resulting from the use of the Digimarc Barcode versus the traditional UPC. It explains the testing methodology, describes the experimental setup, and analyzes the obtained results. It concludes that the Digimarc Barcode increases number of items per minute (IPM) scanned at least 50% over traditional UPC.
NASA Technical Reports Server (NTRS)
Perry, J. C.
1975-01-01
A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.
NASA Technical Reports Server (NTRS)
Counts, B.
1984-01-01
The following are test results from the performance sections of the 51-A V1103.03 conducted on October 31,1984. During this checkout, an astronaut commented that the O2 actuator on SEMU 1052 (PLSS 1007) seemed stiffer to operate than the other two units.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A partial acceptance test was conducted on the El Toro Library Solar Energy System, and the detailed results of the various mode acceptance tests are given. All the modes tested function as designed. Collector array efficiencies were calculated at approximately 40%. Chiller COP was estimated at .50, with chiller loop flow rates approximately 85 to 90% of design flow. The acceptance test included visual inspection, preoperational testing and procedure verification, operational mode checkout, and performance testing. (LEW)
Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation
NASA Technical Reports Server (NTRS)
Pavlock, Kate M.
2011-01-01
Lessons Learne: 1. Design-out unnecessary risk to prevent excessive mitigation management during flight. 2. Consider iterative checkouts to confirm or improve human factor characteristics. 3. Consider the total flight test profile to uncover unanticipated human-algorithm interactions. 4. Consider test card cadence as a metric to assess test readiness. 5. Full-scale flight test is critical to development, maturation, and acceptance of adaptive control laws for operational use.
NASA Technical Reports Server (NTRS)
1979-01-01
The performance test results of the final under-the-wing engine configuration are presented. One hundred and six hours of engine operation were completed, including mechanical and performance checkout, baseline acoustic testing with a bellmouth inlet, reverse thrust testing, acoustic technology tests, and limited controls testing. The engine includes a variable pitch fan having advanced composite fan blades and using a ball-spline pitch actuation system.
Cryogenic Pressure Control Modeling for Ellipsoidal Space Tanks
NASA Technical Reports Server (NTRS)
Lopez, Alfredo; Grayson, Gary D.; Chandler, Frank O.; Hastings, Leon J.; Heyadat, Ali
2007-01-01
A computational fluid dynamics (CFD) model is developed to simulate pressure control of an ellipsoidal-shaped liquid hydrogen tank under external heating in normal gravity. Pressure control is provided by an axial jet thermodynamic vent system (TVS) centered within the vessel that injects cooler liquid into the tank, mixing the contents and reducing tank pressure. The two-phase cryogenic tank model considers liquid hydrogen in its own vapor with liquid density varying with temperature only and a fully compressible ullage. The axisymmetric model is developed using a custom version of the commercially available FLOW-31) software. Quantitative model validation is ,provided by engineering checkout tests performed at Marshall Space Flight Center in 1999 in support of the Solar Thermal Upper Stage_ Technology Demonstrator (STUSTD) program. The engineering checkout tests provide cryogenic tank self-pressurization test data at various heat leaks and tank fill levels. The predicted self-pressurization rates, ullage and liquid temperatures at discrete locations within the STUSTD tank are in good agreement with test data. The work presented here advances current CFD modeling capabilities for cryogenic pressure control and helps develop a low cost CFD-based design process for space hardware.
Contamination control program plan for the ultraviolet spectrometer experiment, revision E
NASA Technical Reports Server (NTRS)
Gilmore, D. B.
1972-01-01
The contamination control program plan delineates the cleanliness requirements to be attained and maintained, and the methods to be utilized, in the fabrication, handling, test, calibration, shipment, pre-installation checkout and installation for the ultraviolet spectrometer experiment prototype, qualification and flight equipment.
2012-07-31
CAPE CANAVERAL, Fla. - NASA's Morpheus lander, a vertical test bed vehicle, is being moved out of its checkout building for a short trip to a launch position at the Shuttle Landing Facility, or SLF, at the Kennedy Space Center in Florida. Morpheus is designed to demonstrate new green propellant propulsion systems and autonomous landing and an Autonomous Landing and Hazard Avoidance Technology, or ALHAT, system. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Dimitri Gerondidakis
2012-07-31
CAPE CANAVERAL, Fla. - NASA's Morpheus lander, a vertical test bed vehicle, is being transported out from its checkout building for a short trip to a launch position at the Shuttle Landing Facility, or SLF, at the Kennedy Space Center in Florida. Morpheus is designed to demonstrate new green propellant propulsion systems and autonomous landing and an Autonomous Landing and Hazard Avoidance Technology, or ALHAT, system. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Dimitri Gerondidakis
2012-07-31
CAPE CANAVERAL, Fla. - NASA's Morpheus lander, a vertical test bed vehicle, is being moved out of its checkout building for a short trip to a launch position at the Shuttle Landing Facility, or SLF, at the Kennedy Space Center in Florida. Morpheus is designed to demonstrate new green propellant propulsion systems and autonomous landing and an Autonomous Landing and Hazard Avoidance Technology, or ALHAT, system. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Dimitri Gerondidakis
2012-07-31
CAPE CANAVERAL, Fla. - NASA's Morpheus lander, a vertical test bed vehicle, is being transported out from its checkout building for a short trip to a launch position at the Shuttle Landing Facility, or SLF, at the Kennedy Space Center in Florida. Morpheus is designed to demonstrate new green propellant propulsion systems and autonomous landing and an Autonomous Landing and Hazard Avoidance Technology, or ALHAT, system. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Dimitri Gerondidakis
2012-07-31
CAPE CANAVERAL, Fla. - NASA's Morpheus lander, a vertical test bed vehicle, is being transported out of its checkout building for a short trip to a launch position at the Shuttle Landing Facility, or SLF, at the Kennedy Space Center in Florida. Morpheus is designed to demonstrate new green propellant propulsion systems and autonomous landing and an Autonomous Landing and Hazard Avoidance Technology, or ALHAT, system. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Dimitri Gerondidakis
KSC ground operations planning for Space Station
NASA Technical Reports Server (NTRS)
Lyon, J. R.; Revesz, W., Jr.
1993-01-01
At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, the Orion crew module structural test article (STA) is secured on a test tool called the birdcage. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will undergo further testing in the high bay. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
NASA Technical Reports Server (NTRS)
Caplin, R. S.; Royer, E. R.
1977-01-01
Design analysis of a microbial load monitor system flight engineering model was presented. Checkout of the card taper and media pump system was fabricated as well as the final two incubating reading heads, the sample receiving and card loading device assembly, related sterility testing, and software. Progress in these areas was summarized.
NASA Technical Reports Server (NTRS)
Edwards, B. B.; Coffey, E. W.
1974-01-01
The theory and operation of the scanner portion of the laser Doppler system for detecting and monitoring aircraft trailing vortices in an airport environment are discussed. Schematics, wiring diagrams, component values, and operation and checkout procedures are included.
Food at checkouts in non-food stores: a cross-sectional study of a large indoor shopping mall.
Wright, James; Kamp, Erin; White, Martin; Adams, Jean; Sowden, Sarah
2015-10-01
To investigate the display of food at non-food store checkouts; and to classify foods by type and nutrient content, presence of price promotions and whether food was at child height. Cross-sectional survey of checkout displays at non-food stores. Foods were classified as 'less healthy' or healthier using the UK Food Standards Agency's Nutrient Profile Model. Written price promotions were recorded. Child height was defined as the sight line of an 11-year-old approximated from UK growth charts. A large indoor shopping mall, Gateshead, UK, February-March 2014. Two hundred and five out of 219 non-food stores in the shopping mall directory which were open for trading. Thirty-two (15·6%) of 205 non-food stores displayed food at the checkout. All displayed less healthy foods, and fourteen (43·8%) had healthier foods. Overall, 5911 checkout foods were identified. Of these, 4763 (80·6%) were 'less healthy'. No fruits, vegetables, nuts or seeds were found. Of 4763 less healthy foods displayed, 195 (4·1%) were subject to price promotions, compared with twelve of 1148 (1·0%) healthier foods (χ 2(df=1)=25·4, P<0·0001). There was no difference in the proportion of less healthy (95·1%) and healthier (96·2%) foods displayed at child height. Almost one-sixth of non-food stores displayed checkout food, the majority of which was 'less healthy' and displayed at child height. Less healthy food was more likely to be subject to a written price promotion than healthier food. Further research into the drivers and consequences of checkout food in non-food stores is needed. Public health regulation may be warranted.
NASA Technical Reports Server (NTRS)
1972-01-01
An analysis was conducted of the space shuttle propulsion systems to define the onboard checkout and monitoring function. A baseline space shuttle vehicle and mission were used to establish the techniques and approach for defining the requirements. The requirements were analyzed to formulate criteria for implementing the functions of preflight checkout, performance monitoring, fault isolation, emergency detection, display, data storage, postflight evaluation, and maintenance retest.
Orion Crew Module Structural Test Article Arrival
2016-11-15
NASA’s Super Guppy aircraft, carrying the Orion crew module structural test article (STA), arrives at the Shuttle Landing Facility operated by Space Florida at NASA’s Kennedy Space Center in Florida. The STA will be offloaded and transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
NASA Technical Reports Server (NTRS)
Shelton, D. H.
1975-01-01
A brief functional description of the Apollo lunar module stabilization and control subsystem is presented. Subsystem requirements definition, design, development, test results, and flight experiences are discussed. Detailed discussions are presented of problems encountered and the resulting corrective actions taken during the course of assembly-level testing, integrated vehicle checkout and test, and mission operations. Although the main experiences described are problem oriented, the subsystem has performed satisfactorily in flight.
A guide to onboard checkout. Volume 4: Propulsion
NASA Technical Reports Server (NTRS)
1971-01-01
The propulsion system for a space station is considered with respect to onboard checkout requirements. Failure analysis, reliability, and maintenance features are presented. Computer analysis techniques are also discussed.
Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem
NASA Technical Reports Server (NTRS)
Kleiner, G. N.
1981-01-01
The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.
Liquid rocket valve assemblies
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operating characteristics of valve assemblies used in liquid propellant rocket engines are discussed. The subjects considered are as follows: (1) valve selection parameters, (2) major design aspects, (3) design integration of valve subassemblies, and (4) assembly of components and functional tests. Information is provided on engine, stage, and spacecraft checkout procedures.
Fault detection monitor circuit provides ''self-heal capability'' in electronic modules - A concept
NASA Technical Reports Server (NTRS)
Kennedy, J. J.
1970-01-01
Self-checking technique detects defective solid state modules used in electronic test and checkout instrumentation. A ten bit register provides failure monitor and indication for 1023 comparator circuits, and the automatic fault-isolation capability permits the electronic subsystems to be repaired by replacing the defective module.
Center Director Bridges addresses guests at ribbon cutting for the new Checkout & Launch Control
NASA Technical Reports Server (NTRS)
2000-01-01
KSC Director Roy Bridges addresses attendees at a ribbon cutting for the new Checkout and Launch Control System (CLCS) at the Hypergolic Maintenance Facility (HMF). The CLCS was declared operational in a ribbon cutting ceremony earlier. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing.
2012-04-19
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA’s Kennedy Space Center in Florida, a cargo bag designed to keep its contents cool is readied to receive the NanoRacks-CubeLabs Module-9 experiments. The module’s experiments requiring cold stowage are being prepared for transport to Space Launch Complex-40 on nearby Cape Canaveral Air Force Station. There, the bags will be loaded into the Space Exploration Technologies Dragon capsule in preparation for its scheduled April 30 liftoff aboard a Falcon 9 rocket. NanoRacks-CubeLabs Module-9 uses a two-cube unit box for student competition investigations using 15 liquid mixing tube assemblies that function similar to commercial glow sticks. The investigations range from microbial growth to water purification in microgravity. Known as SpaceX, the launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the module and other cargo will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two private companies to launch cargo safely to the station. For more information, visit http://www.nasa.gov/spacex. Photo credit: NASA/Jim Grossmann
2012-04-19
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA’s Kennedy Space Center in Florida, the NanoRacks-CubeLabs Module-9 experiments requiring refrigeration are placed in a cargo bag designed to keep its contents cool. The module’s experiments requiring cold stowage are being prepared for transport to Space Launch Complex-40 on nearby Cape Canaveral Air Force Station. There, the bags will be loaded into the Space Exploration Technologies Dragon capsule in preparation for its scheduled April 30 liftoff aboard a Falcon 9 rocket. NanoRacks-CubeLabs Module-9 uses a two-cube unit box for student competition investigations using 15 liquid mixing tube assemblies that function similar to commercial glow sticks. The investigations range from microbial growth to water purification in microgravity. Known as SpaceX, the launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the module and other cargo will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two private companies to launch cargo safely to the station. For more information, visit http://www.nasa.gov/spacex. Photo credit: NASA/Jim Grossmann
2012-04-19
CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA’s Kennedy Space Center in Florida, the NanoRacks-CubeLabs Module-9 experiments requiring refrigeration are prepared for placement in a cargo bag designed to keep its contents cool. The module’s experiments requiring cold stowage are being prepared for transport to Space Launch Complex-40 on nearby Cape Canaveral Air Force Station. There, the bags will be loaded into the Space Exploration Technologies Dragon capsule in preparation for its scheduled April 30 liftoff aboard a Falcon 9 rocket. NanoRacks-CubeLabs Module-9 uses a two-cube unit box for student competition investigations using 15 liquid mixing tube assemblies that function similar to commercial glow sticks. The investigations range from microbial growth to water purification in microgravity. Known as SpaceX, the launch will be the company's second demonstration test flight for NASA's Commercial Orbital Transportation Services program, or COTS. During the flight, the capsule will conduct a series of check-out procedures to test and prove its systems, including rendezvous and berthing with the International Space Station. If the capsule performs as planned, the module and other cargo will be transferred to the station. The cargo includes food, water and provisions for the station’s Expedition crews, such as clothing, batteries and computer equipment. Under COTS, NASA has partnered with two private companies to launch cargo safely to the station. For more information, visit http://www.nasa.gov/spacex. Photo credit: NASA/Jim Grossmann
A guide to onboard checkout. Volume 3: Electrical power
NASA Technical Reports Server (NTRS)
1971-01-01
The baseline electrical power subsystem for a space station is considered. The subsystem was anlayzed in order to define onboard checkout requirements. Reliability, failure effects, and maintenance are discussed.
Orion Crew Module Adapter-Structural Test Article and European S
2017-05-09
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, operations are underway to lower the Orion crew module adapter structural test article onto the European Space Agency's service module structural test article. After the hardware is attached, the structure will be packed and shipped to Lockheed Martin's Denver facility to undergo testing. The Orion spacecraft will launch atop the agency's Space Launch System rocket on Exploration Mission-1 in 2019.
Orion Crew Module Structural Test Article Lift & Uncrating
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the cover has been removed from the container holding the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft has been opened and the container holding the Orion crew module structural test article (STA) is being offloaded. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
NASA’s Super Guppy aircraft, carrying the Orion crew module structural test article, arrived at the Shuttle Landing Facility operated by Space Florida at NASA’s Kennedy Space Center in Florida. The unique aircraft has been opened to reveal the container holding the STA. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Unbagging
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, Lockheed Martin technicians remove the protective covering from the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Unbagging
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the cover has been removed from the container holding the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft has been opened and the container holding the Orion crew module structural test article (STA) is being offloaded. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018. Photo credit: NASA/Ben Smegelsky
Orion Crew Module Structural Test Article Offload
2016-11-15
NASA’s Super Guppy aircraft, carrying the Orion crew module structural test article (STA), arrived at the Shuttle Landing Facility operated by Space Florida at NASA’s Kennedy Space Center in Florida. The unique aircraft is being opened to offload the STA. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft was opened and the container holding the Orion crew module structural test article (STA) was offloaded. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
NASA’s Super Guppy aircraft, carrying the Orion crew module structural test article, arrived at the Shuttle Landing Facility operated by Space Florida at NASA’s Kennedy Space Center in Florida. The unique aircraft has been opened and the container holding the STA is being offloaded. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Offload
2016-11-15
NASA’s Super Guppy aircraft, carrying the Orion crew module structural test article (STA), arrived at the Shuttle Landing Facility operated by Space Florida at NASA’s Kennedy Space Center in Florida. The front of the unique aircraft is being opened to offload the STA. The test article will be transported to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Development of a test and flight engineering oriented language, phase 3
NASA Technical Reports Server (NTRS)
Kamsler, W. F.; Case, C. W.; Kinney, E. L.; Gyure, J.
1970-01-01
Based on an analysis of previously developed test oriented languages and a study of test language requirements, a high order language was designed to enable test and flight engineers to checkout and operate the proposed space shuttle and other NASA vehicles and experiments. The language is called ALOFT (a language oriented to flight engineering and testing). The language is described, its terminology is compared to similar terms in other test languages, and its features and utilization are discussed. The appendix provides the specifications for ALOFT.
Lunar Surface Operations. Part 1; Post-Touchdown Lunar Surface and System Checkouts
NASA Technical Reports Server (NTRS)
Interbartolo, Michael
2009-01-01
This slide presentation reviews the first part of the post-touchdown lunar surface and system checkout tasks. A stay/no stay decision for the lunar lander was made based on the questions: "Is the Lunar Module (LM) stable on the lunar surface?"; "Are there any time critical systems failures or trends indicating impending loss of capability to ascent and achieve a safe lunar orbit?"; and "Is there loss of capability in critical LM systems?" The sequence of these decisions is given as a time after touchdown on the surface of the moon. After the decision to stay is made the next task is to checkout status of the lunar module. While the status of the lunar module is checking out certain conditions, the Command Service Module was also engaged in certain checkout activities.
High-Flow Jet Exit Rig Designed and Fabricated
NASA Technical Reports Server (NTRS)
Buehrle, Robert J.; Trimarchi, Paul A.
2003-01-01
The High-Flow Jet Exit Rig at the NASA Glenn Research Center is designed to test single flow jet nozzles and to measure the appropriate thrust and noise levels. The rig has been designed for the maximum hot condition of 16 lbm/sec of combustion air at 1960 R (maximum) and to produce a maximum thrust of 2000 lb. It was designed for cold flow of 29.1 lbm/sec of air at 530 R. In addition, it can test dual-flow nozzles (nozzles with bypass flow in addition to core flow) with independent control of each flow. The High- Flow Jet Exit Rig was successfully fabricated in late 2001 and is being readied for checkout tests. The rig will be installed in Glenn's Aeroacoustic Propulsion Laboratory. The High-Flow Jet Exit Rig consists of the following major components: a single component force balance, the natural-gas-fueled J-79 combustor assembly, the plenum and manifold assembly, an acoustic/instrumentation/seeding (A/I/S) section, a table, and the research nozzles. The rig will be unique in that it is designed to operate uncooled. The structure survives the 1960 R test condition because it uses carefully selected high temperature alloy materials such as Hastelloy-X. The lower plenum assembly was designed to operate at pressures to 450 psig at 1960 R, in accordance with the ASME B31.3 piping code. The natural gas-fueled combustor fires directly into the lower manifold. The hot air is directed through eight 1-1/2-in. supply pipes that supply the upper plenum. The flow is conditioned in the upper plenum prior to flowing to the research nozzle. The 1-1/2-in. supply lines are arranged in a U-shaped design to provide for a flexible piping system. The combustor assembly checkout was successfully conducted in Glenn's Engine Component Research Laboratory in the spring of 2001. The combustor is a low-smoke version of the J79 combustor used to power the F4 Phantom military aircraft. The natural gas-fueled combustor demonstrated high-efficiency combustion over a wide range of operating conditions. This wide operating envelope is required to support the testing of both single- and dual-flow nozzles. Key research goals include providing simultaneous, highly accurate acoustic, flow, and thrust measurements on jet nozzle models in realistic flight conditions, as well as providing scaleable acoustic results. The High-Flow Jet Exit Rig is a second-generation high-flow test rig. Improvements include cleaner flow with reduced levels of particulate, soot, and odor. Choked-flow metering is required with plus or minus 0.25-percent accuracy. Thrust measurements from 0 to 2000 lbf are required with plus or minus 0.25-percent accuracy. Improved acoustics will be achieved by minimizing noise through large pipe bend radii, lower internal flow velocities, and microdrilled choke plates with thousands of 0.040-in.- diameter holes.
Development of an instrument for assessing workstyle in checkout cashier work (BAsIK).
Kjellberg, Katarina; Palm, Peter; Josephson, Malin
2012-01-01
Checkout cashier work consists of handling a large number of items during a work shift, which implies repetitive movements of the shoulders, arms and hands/wrists, and a high work rate. The work is associated with a high prevalence of disorders in the neck and upper extremity. The concept of workstyle explains how ergonomic and psychosocial factors interact in the development of work-related upper extremity disorders. The aim of the project was to develop an instrument for the occupational health services to be used in the efforts to prevent upper extremity disorders in checkout cashier work. The instrument is based on the workstyle concept and is intended to be used as a tool to identify high-risk workstyle and needs for interventions, such as training and education. The instrument, BAsIK, consists of four parts; a questionnaire about workstyle, an observation protocol for work technique, a checklist about the design of the checkout and a questionnaire about work organization. The instrument was developed by selecting workstyle items developed for office work and adapting them to checkout cashier work, discussions with researchers and ergonomists, focus-group interviews with cashiers, observations of video recordings of cashiers, and studies of existing guidelines and checklists.
STS-27 Atlantis, OV-104, terminal countdown demonstration test (TCDT) at KSC
1988-11-14
S88-53244 (14 Nov 1988) --- The crewmembers for STS-27 leave the operations and checkout (O&C) building en route to a transfer van that will take them to Launch Pad 39B for their terminal countdown demonstration test. From the front to the rear are astronauts Robert L. Gibson, Guy S. Gardner, William M. Shepherd, Richard M. (Mike) Mullane and Jerry L. Ross.
Safety assessment for EPS electron-proton spectrometer
NASA Technical Reports Server (NTRS)
Gleeson, P.
1971-01-01
A safety analysis was conducted to identify the efforts required to assure relatively hazard free operation of the EPS and to meet the safety requirements of the program. Safety engineering criteria, principles, and techniques in applicable disciplines are stressed in the performance of the system and subsystem studies; in test planning; in the design, development, test, evaluation, and checkout of the equipment; and the operating procedures for the EPS program.
NASA Astrophysics Data System (ADS)
Kar, Leow Soo
2014-07-01
Two important factors that influence customer satisfaction in large supermarkets or hypermarkets are adequate parking facilities and short waiting times at the checkout counters. This paper describes the simulation analysis of a large supermarket to determine the optimal levels of these two factors. SAS Simulation Studio is used to model a large supermarket in a shopping mall with car park facility. In order to make the simulation model more realistic, a number of complexities are introduced into the model. For example, arrival patterns of customers vary with the time of the day (morning, afternoon and evening) and with the day of the week (weekdays or weekends), the transport mode of arriving customers (by car or other means), the mode of payment (cash or credit card), customer shopping pattern (leisurely, normal, exact) or choice of checkout counters (normal or express). In this study, we focus on 2 important components of the simulation model, namely the parking area, the normal and express checkout counters. The parking area is modeled using a Resource Pool block where one resource unit represents one parking bay. A customer arriving by car seizes a unit of the resource from the Pool block (parks car) and only releases it when he exits the system. Cars arriving when the Resource Pool is empty (no more parking bays) leave without entering the system. The normal and express checkouts are represented by Server blocks with appropriate service time distributions. As a case study, a supermarket in a shopping mall with a limited number of parking bays in Bangsar was chosen for this research. Empirical data on arrival patterns, arrival modes, payment modes, shopping patterns, service times of the checkout counters were collected and analyzed to validate the model. Sensitivity analysis was also performed with different simulation scenarios to identify the parameters for the optimal number the parking spaces and checkout counters.
Status of the irradiation test vehicle for testing fusion materials in the Advanced Test Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tsai, H.; Gomes, I.C.; Smith, D.L.
1998-09-01
The design of the irradiation test vehicle (ITV) for the Advanced Test Reactor (ATR) has been completed. The main application for the ITV is irradiation testing of candidate fusion structural materials, including vanadium-base alloys, silicon carbide composites, and low-activation steels. Construction of the vehicle is underway at the Lockheed Martin Idaho Technology Company (LMITCO). Dummy test trains are being built for system checkout and fine-tuning. Reactor insertion of the ITV with the dummy test trains is scheduled for fall 1998. Barring unexpected difficulties, the ITV will be available for experiments in early 1999.
2012-08-03
CAPE CANAVERAL, Fla. – Charles Bolden, NASA administrator, center, is shown the high bay at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida by NASA's Scott Wilson, left, and Lockheed Martin's Jules Schneider, right. Lockheed Martin is processing an Orion spacecraft that will make an uncrewed flight test in 2014. Photo credit: NASA/Kim Shifflett
2012-08-03
CAPE CANAVERAL, Fla. – Charles Bolden, NASA administrator, center, is shown the high bay at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida by NASA's Scott Wilson, left, and Lockheed Martin's Jules Schneider, foreground. Lockheed Martin is processing an Orion spacecraft that will make an uncrewed flight test in 2014. Photo credit: NASA/Kim Shifflett
Core Stage Forward Skirt Umbilical Installation onto Mobile Launcher
2017-06-29
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the core stage forward skirt umbilical is installed on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the core stage forward skirt umbilical is installed on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a crane lifts the core stage forward skirt umbilical for installation onto the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, technicians install the core stage forward skirt umbilical on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
51. LINES AT TIME OFFICE NO. 13 AT CHECKOUT TIME. ...
51. LINES AT TIME OFFICE NO. 13 AT CHECKOUT TIME. SEAPLANE HANGARS (BLDGS. 1-2) IN BACKGROUND. USN PHOTO, JULY 11, 1941. - Quonset Point Naval Air Station, Roger Williams Way, North Kingstown, Washington County, RI
EP of a Different Class: The Challenges of Testing for MW Missions
2012-07-20
that the pumping capacity of the Large Vacuum Test Facility (LVTF) at PEPL (Figure 3) at 520,000 l/s on air makes it most suitable for initial checkout...evaluation of the thruster. NASA Glenn Research Center’s Vacuum Facility 5 (VF5) (Figure 4), with its increased pumping speed of 3,500,000 l/s on air...reader to Dr. Dan Goebel’s IEPC 2011 paper.41 IV. Facility Selection and Preparation Facility Size and Pumping High T/P thruster testing
Evaluation of Acoustic Emission SHM of PRSEUS Composite Pressure Cube Tests
NASA Technical Reports Server (NTRS)
Horne, Michael R.; Madaras, Eric I.
2013-01-01
A series of tests of the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) pressure cube were conducted during third quarter 2011 at NASA Langley Research Center (LaRC) in the Combined Loads Test facility (COLTS). This is a report of the analysis of the Acoustic Emission (AE) data collected during those tests. The AE signals of the later tests are consistent with the final failure progression through two of the pressure cube panels. Calibration tests and damage precursor AE indications, from preliminary checkout pressurizations, indicated areas of concern that eventually failed. Hence those tests have potential for vehicle health monitoring.
NASA Technical Reports Server (NTRS)
Flanders, J. H.; Helmers, C. T.; Stanten, S. F.
1973-01-01
This report deals with the feasibility, problems, solutions, and mapping of a GOAL language to HAL language translator. Ground Operations Aerospace Language, or GOAL, is a test-oriented higher order language developed by the John F. Kennedy Space Center to be used in checkout and launch of the space shuttle. HAL is a structured higher order language developed by the Johnson Space Center to be used in writing the flight software for the onboard shuttle computers. Since the onboard computers will extensively support ground checkout of the space shuttle, and since these computers and the software development facilities on the ground use the HAL language as baseline, the translation of GOAL to HAL becomes significant. The issue of feasibility was examined and it was found that a GOAL to HAL translator is feasible. Special problems are identified and solutions proposed. Finally, examples of translation are provided for each category of complete GOAL statement.
A Survey and Evaluation of Software Quality Assurance.
1984-09-01
activities; 2. Cryptologic activities related to national security; 3. Command and control of military forces; 4. Equipment that is an integral part of a...Testing and Integration , and Performance or Operation (6). Figure 3 shows the software life cycle and the key outputs of the phases. The first phase to...defects. This procedure is considered the Checkout (13:09-91). Once coding is complete, the Testing and Integration Phase begins. Here the developed
Containment of composite fan blades
NASA Technical Reports Server (NTRS)
Stotler, C. L.; Coppa, A. P.
1979-01-01
A lightweight containment was developed for turbofan engine fan blades. Subscale ballistic-type tests were first run on a number of concepts. The most promising configuration was selected and further evaluated by larger scale tests in a rotating test rig. Weight savings made possible by the use of this new containment system were determined and extrapolated to a CF6-size engine. An analytical technique was also developed to predict the released blades motion when involved in the blade/casing interaction process. Initial checkout of this procedure was accomplished using several of the tests run during the program.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft was opened and the container holding the Orion crew module structural test article (STA) was offloaded. A crane has lifted the container for placement on a transporter. The test article will be moved to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians secure the transport container with the Orion Exploration Mission-1 (EM-1) structural test article onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft was opened and the container holding the Orion crew module structural test article (STA) was offloaded. A crane was used to lower the container onto a transporter. The test article will be moved to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Transport from SLF to
2016-11-15
A transporter carrying the Orion crew module structural test article (STA) in its container arrives at the low bay entrance of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Unbagging
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the protective covering was removed from the Orion crew module structural test article (STA). It remains secured on the bottom of its transport container. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article inside its transport container, is secured onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
Orion Crew Module Structural Test Article Offload
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft was opened and the container holding the Orion crew module structural test article (STA) was offloaded. A crane is used to lower the container for placement on a transporter. The test article will be moved to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Lift & Uncrating
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians with Lockheed Martin assist as a crane lifts the cover away from the container holding the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians secure the Orion Exploration Mission-1 (EM-1) structural test article in its transport container onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article, secured inside its transport container, is lowered onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
Orion Crew Module Structural Test Article Transport from SLF to
2016-11-15
A transporter carrying the Orion crew module structural test article (STA) in its container arrives inside the low bay of the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Lift & Uncrating
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a crane lifts the cover up from the container holding the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion Crew Module Structural Test Article Unbagging
2016-11-15
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians with Lockheed Martin look over the Orion crew module structural test article (STA) secured on the bottom of its transport container. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article was moved inside the facility's high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
NASA Technical Reports Server (NTRS)
Ravenhall, R.; Salemme, C. T.
1977-01-01
A total of 38 quiet clean short haul experimental engine under the wing composite fan blades were manufactured for various component tests, process and tooling, checkout, and use in the QCSEE UTW engine. The component tests included frequency characterization, strain distribution, bench fatigue, platform static load, whirligig high cycle fatigue, whirligig low cycle fatigue, whirligig strain distribution, and whirligig over-speed. All tests were successfully completed. All blades planned for use in the engine were subjected to and passed a whirligig proof spin test.
Personnel in blue and white FCR bldg 30 during STS-106
2000-09-19
JSC2000-E-22832 (13 September 2000) --- Gary Ford intently watches a monitor at the Assembly and Checkout Officer (ACO) console in Houston's Mission Control Center (MCC). The ACO is responsible for station assembly, activation and checkout operations.
NASA Technical Reports Server (NTRS)
1976-01-01
TRW has applied the Apollo checkout procedures to retail-store and bank-transaction systems, as well as to control systems for electric power transmission grids -- reducing the chance of power blackouts. Automatic checkout equipment for Apollo Spacecraft is one of the most complex computer systems in the world. Used to integrate extensive Apollo checkout procedures from manufacture to launch, it has spawned major advances in computer systems technology. Store and bank credit system has caused significant improvement in speed and accuracy of transactions, credit authorization, and inventory control. A similar computer service called "Validata" is used nationwide by airlines, airline ticket offices, car rental agencies, and hotels.
Presence of Candy and Snack Food at Checkout in Chain Stores: Results of a Pilot Study.
Basch, Corey H; Kernan, William D; Menafro, Anthony
2016-10-01
Community health professionals must use multiple strategies to address the rising rates of childhood obesity in the United States. One such strategy is to address the underlying causes of childhood obesity, including lack of exercise and the consumption of calorically-dense snack foods. This study examines the presence of candy and snack food in the checkout lines of all retail chain stores in a selected community to determine the presence of these products, the ways in which these products are promoted, and the type of physical environment through which customers navigate during the checkout process. The findings confirm that candy, soft drinks, snacks, and ice cream were present in a large majority of these retail stores. Further, this pilot study found that many of these stores "corral" customers through the check-out line in such a way that it is necessary to pass these snack foods directly. Three themes for discussion emerged from the review of the data collected, including product marketing, product packaging, and product placement. Implications for childhood health are presented in the context of these marketing strategies. The results and subsequent discussion provide important insight into the ways in which the presence of candy and snack food at checkout lines might contribute to childhood obesity rates.
NASA Technical Reports Server (NTRS)
Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.
2013-01-01
The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.
GEMINI-TITAN (GT)-11 - PREFLIGHT PREP - CHECKOUT - CAPE
1966-07-21
S66-47635 (21 July 1966) --- McDonnell Aircraft Corporation personnel bolt the Gemini-11 spacecraft to a support ring for bore sighting in the Pyrotechnic Installation Building, Merritt Island, during checkout and preflight preparations at the Kennedy Space Center. Photo credit: NASA
High Energy Astronomy Observatory (HEAO)
1977-08-01
This picture is of an Atlas/Centaur launch vehicle, carrying the High Energy Astronomy Observatory (HEAO)-1, on Launch Complex 36 at the Air Force Eastern Test Range prior to launch on August 12, 1977. The Kennedy Space Center managed the launch operations that included a pre-aunch checkout, launch, and flight, up through the observatory separation in orbit.
2012-08-03
CAPE CANAVERAL, Fla. – Lockheed Martin's Jules Schneider, right, shows details of the preparation hardware used for the Orion capsule to Charles Bolden, NASA administrator, center. The Orion capsule will make an uncrewed flight test in 2014. The spacecraft is in the high bay at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Photo credit: NASA/Kim Shifflett
2012-03-13
ISS030-E-135163 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135148 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135140 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135185 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135187 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135135 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
2012-03-13
ISS030-E-135157 (13 March 2012) --- A fisheye lens attached to an electronic still camera was used to capture this image of Robonaut 2 humanoid robot during another system checkout in the Destiny laboratory of the International Space Station. Teams on the ground commanded Robonaut through a series of dexterity tests as it spelled out ?Hello world? in sign language.
117. VIEW OF CABINETS ON EAST SIDE OF LANDLINE INSTRUMENTATION ...
117. VIEW OF CABINETS ON EAST SIDE OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751). FEATURES LEFT TO RIGHT: ALTERNATING CURRENT POWER DISTRIBUTION RELAY BOX, AIRBORNE BEACON ELECTRONIC TEST SYSTEM (ABETS), AUTOPILOT CHECKOUT CONTROLS, POWER DISTRIBUTION UNITS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Mod-2 wind turbine project assessment and cluster test plans
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1982-01-01
An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians attach lines from a crane to the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be lifted out of its container and moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians prepare to attach lines from a crane to the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be lifted out of its container and moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane begins to lift the Orion crew module structural test article (STA) up from the base of its transport container. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane moves the Orion crew module structural test article (STA) along the center aisle of the high bay. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane lowers the Orion crew module structural test article (STA) toward a test tool called the birdcage. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be secured on the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane lowers the Orion crew module structural test article (STA) onto a test tool called the birdcage. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be secured on the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane lifts the Orion crew module structural test article (STA) up from the base of its transport container. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians check the lines attached from a crane to the Orion crew module structural test article (STA). The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be lifted out of its container and moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Move to Birdcage
2016-11-16
Inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, Lockheed Martin technicians monitor the progress as a crane lifts the Orion crew module structural test article (STA) away from the base of its transport container. The STA arrived aboard NASA's Super Guppy aircraft at the Shuttle Landing Facility operated by Space Florida. The test article will be moved to a test tool called the birdcage for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Communication at Work: An Ethnography of Checkout Operators.
ERIC Educational Resources Information Center
Searle, Jean
1991-01-01
A framework for identifying information regarding workplace communication requirements is presented that assumes communication involves sign systems as well as spoken and written language. Research with suburban supermarket checkout operators indicates that communication is deeply embedded in the social context. (Contains 18 references.) (LB)
NASA Technical Reports Server (NTRS)
Wilson, D. J.; Krause, M. C.; Craven, C. E.; Edwards, B. B.; Coffey, E. W.; Huang, C. C.; Jetton, J. L.; Morrison, L. K.
1974-01-01
A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.
Hybrid Residual Flexibility/Mass-Additive Method for Structural Dynamic Testing
NASA Technical Reports Server (NTRS)
Tinker, M. L.
2003-01-01
A large fixture was designed and constructed for modal vibration testing of International Space Station elements. This fixed-base test fixture, which weighs thousands of pounds and is anchored to a massive concrete floor, initially utilized spherical bearings and pendulum mechanisms to simulate Shuttle orbiter boundary constraints for launch of the hardware. Many difficulties were encountered during a checkout test of the common module prototype structure, mainly due to undesirable friction and excessive clearances in the test-article-to-fixture interface bearings. Measured mode shapes and frequencies were not representative of orbiter-constrained modes due to the friction and clearance effects in the bearings. As a result, a major redesign effort for the interface mechanisms was undertaken. The total cost of the fixture design, construction and checkout, and redesign was over $2 million. Because of the problems experienced with fixed-base testing, alternative free-suspension methods were studied, including the residual flexibility and mass-additive approaches. Free-suspension structural dynamics test methods utilize soft elastic bungee cords and overhead frame suspension systems that are less complex and much less expensive than fixed-base systems. The cost of free-suspension fixturing is on the order of tens of thousands of dollars as opposed to millions, for large fixed-base fixturing. In addition, free-suspension test configurations are portable, allowing modal tests to be done at sites without modal test facilities. For example, a mass-additive modal test of the ASTRO-1 Shuttle payload was done at the Kennedy Space Center launch site. In this Technical Memorandum, the mass-additive and residual flexibility test methods are described in detail. A discussion of a hybrid approach that combines the best characteristics of each method follows and is the focus of the study.
1. VIEW NORTHEAST, LEFT TO RIGHT COLD CALIBRATION TEST STAND ...
1. VIEW NORTHEAST, LEFT TO RIGHT COLD CALIBRATION TEST STAND COLD CALIBRATION BLOCKHOUSE IN FOREGROUND. - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
Brown, Rominger and Curbeam conduct flight control systems checkout
1997-08-29
STS085-330-034 (7 - 19 August 1997) --- From the left, astronauts Curtis L. Brown, Jr., mission commander; Robert L. Curbeam, Jr., mission specialist; and Kent V. Rominger, pilot, are pictured on the Space Shuttle Discovery's flight deck during a checkout of flight control systems.
69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR ...
69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR PANEL) AND RANGE SAFETY (DESTRUCT SYSTEM CONTROL MONITOR PANEL) PANELS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
European Service Module Structural Test Article Load onto Transport Truck
2017-06-21
The Orion service module structural test article for Exploration Mission-1 (EM-1), built by the European Space Agency, is prepared for shipment to Lockheed Martin's Denver facility to undergo testing. Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a crane lifts the module onto a transport truck, where it is secured to be moved to the Shuttle Landing Facility for shipment. The Orion spacecraft will launch atop the agency's Space Launch System rocket on EM-1 in 2019.
2017-11-17
The Orion crew module for Exploration Mission-1 was moved into the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
2017-11-17
Technicians assist as the Orion crew module for Exploration Mission-1 is moved toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
European Service Module-Structural Test Article Load onto Transp
2017-06-21
The Orion service module structural test article for Exploration Mission-1 (EM-1), built by the European Space Agency, is prepared for shipment to Lockheed Martin's Denver facility to undergo testing. Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, workers secure the protective covering around the module and a crane lifts the module, secured on stand, for the move to the transport truck. The Orion spacecraft will launch atop the agency's Space Launch System rocket on EM-1 in 2019.
Spofford, Christina M; Bayman, Emine O; Szeluga, Debra J; From, Robert P
2012-01-01
Novel methods for teaching are needed to enhance the efficiency of academic anesthesia departments as well as provide approaches to learning that are aligned with current trends and advances in technology. A video was produced that taught the key elements of anesthesia machine checkout and room set up. Novice learners were randomly assigned to receive either the new video format or traditional lecture-based format for this topic during their regularly scheduled lecture series. Primary outcome was the difference in written examination score before and after teaching between the two groups. Secondary outcome was the satisfaction score of the trainees in the two groups. Forty-two students assigned to the video group and 36 students assigned to the lecture group completed the study. Students in each group similar interest in anesthesia, pre-test scores, post-test scores, and final exam scores. The median posttest to pretest difference was greater in the video groups (3.5 (3.0-5.0) vs 2.5 (2.0-3.0), for video and lecture groups respectively, p 0.002). Despite improved test scores, students reported higher satisfaction the traditional, lecture-based format (22.0 (18.0-24.0) vs 24.0 (20.0-28.0), for video and lecture groups respectively, p <0.004). Higher pre-test to post-test improvements were observed among students in the video-based teaching group, however students rated traditional, live lectures higher than newer video-based teaching.
Communication at Work: An Ethnography of Checkout Operators.
ERIC Educational Resources Information Center
Searle, Jean
An investigation focused on communication demands of the workplace, specifically those placed on checkout operators at a supermarket in Queensland, Australia. Key questions organized the investigation: What is the nature of communication in this workplace? How can this information be obtained? and How can the information be used to develop…
HELIOS dual swept frequency radiometer
NASA Technical Reports Server (NTRS)
White, J. R.
1975-01-01
The HELIOS dual swept frequency radiometer, used in conjunction with a dipole antenna, was designed to measure electromagnetic radiation in space. An engineering prototype was fabricated and tested on the HELIOS spacecraft. Two prototypes and two flight units were fabricated and three of the four units were integrated into the HELIOS spacecraft. Two sets of ground support equipment were provided for checkout of the radiometer.
Can You Fathom This? Connecting Data Analysis, Algebra, and Geometry with Probability Simulation
ERIC Educational Resources Information Center
Edwards, Michael Todd; Phelps, Steve
2008-01-01
Data analysis plays a prominent role in various facets of modern life: Schools evaluate and revise programs on the basis of test scores; policymakers make decisions on the basis of information gleaned from polling data; supermarkets stock shelves on the basis of data collected at checkout lanes. Data analysis provides teachers with new tools and…
2012-08-03
CAPE CANAVERAL, Fla. – Lockheed Martin's Jules Schneider, right, shows the upper portion of the Orion capsule to Charles Bolden, NASA administrator, center, as NASA's Scott Wilson looks on. The Orion capsule will make an uncrewed flight test in 2014. The spacecraft is in the high bay at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Photo credit: NASA/Kim Shifflett
2012-08-03
CAPE CANAVERAL, Fla. – Lockheed Martin's Jules Schneider, right, shows the upper portion of the Orion capsule to Charles Bolden, NASA administrator, center, as NASA's Scott Wilson looks on. The Orion capsule will make an uncrewed flight test in 2014. The spacecraft is in the high bay at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Photo credit: NASA/Kim Shifflett
2001-07-14
The solar-electric Helios Prototype flying wing is shown moments after takeoff, beginning its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2001-07-14
The solar-electric Helios Prototype flying wing is shown over the Pacific Ocean during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2001-07-14
The solar-electric Helios Prototype flying wing is shown over the Pacific Ocean during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
ERIC Educational Resources Information Center
Rifkin, Kenneth I.; And Others
The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-06
CAPE CANAVERAL, Fla. – Technicians lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-06
CAPE CANAVERAL, Fla. – Technicians lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians lift a special fixture inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
GSDO PDR (Preliminary Design Review) Morning Meeting
2014-03-20
CAPE CANAVERAL, Fla. – Mike Bolger, program manager for the Ground Systems Development and Operations, or GSDO, Program speaks to participants during completion of the preliminary design review in the Mission Briefing Room inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. Representatives from NASA, its contractor partners and experts from across the aerospace industry met in the Mission Briefing Room inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida to conclude the initial design and technology development phase. Completion of this review has validated that the baseline architecture is sound and aligns with the agency's exploration objectives. NASA is developing the Space Launch System and Orion spacecraft to provide an entirely new capability for human exploration beyond low-Earth orbit, with the flexibility to launch spacecraft for crew and cargo missions, including to an asteroid and Mars. Orion’s first unpiloted test flight is scheduled to launch later this year atop a Delta IV rocket. A second uncrewed flight test is scheduled for fiscal year 2018 on the Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Cory Huston
2004-02-13
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers confirm the Multi-Purpose Logistics Module Donatello is safely in place on a work stand. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello, is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Donatello is slowly lowered toward a work stand. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-18
KENNEDY SPACE CENTER, FLA. - All three Multi-Purpose Logistics Modules are on the floor of the Space Station Processing Facility. This is the first time the three - Leonardo, Raffaello and Donatello -- have been in one location. Donatello has been stored in the Operations and Checkout Building since its arrival at KSC and was brought into the SSPF for routine testing. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is moved away from the payload canister in the Space Station Processing Facility. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help the Multi-Purpose Logistics Module Donatello settle onto a work stand. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello, is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Donatello is suspended by cables over the payload canister in the Space Station Processing Facility. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-18
KENNEDY SPACE CENTER, FLA. - This view reveals all three Multi-Purpose Logistics Modules on the floor of the Space Station Processing Facility. This is the first time all three - Leonardo, Raffaello and Donatello -- have been in one location. Donatello has been stored in the Operations and Checkout Building since its arrival at KSC and was brought into the SSPF for routine testing. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
Orion Crew Module Structural Test Article Transport from SLF to
2016-11-15
After arriving at the Shuttle Landing Facility operated by Space Florida at NASA's Kennedy Space Center in Florida, the agency's Super Guppy aircraft was opened and the container holding the Orion crew module structural test article (STA) was offloaded. A crane was used to lower the container for placement on a transporter. The Super Guppy has been closed. The test article will be moved to the Neil Armstrong Operations and Checkout Building high bay for further testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article is secured inside its transport container. Technicians monitor the progress as a crane is used to move the container toward a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
Orion EM-1 Crew Module Structural Test Article Prepped for Trans
2017-04-24
Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article is secured inside its transport container. A crane is used to move the container toward a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.
2018-04-09
The first optical quality testing on a full window stack that is ready for installation in the docking hatch of NASA's Orion spacecraft is underway inside a laboratory in the Neil Armstrong Operations and Checkout Building at the agency's Kennedy Space Center in Florida. The test is being performed by a team from the center's Exploration Research and Technology Programs. The data from the tests will help improve the requirements for manufacturing tolerances on Orion's windows and verify how the window should perform in space. Orion is being prepared for its first integrated uncrewed flight atop NASA's Space Launch System rocket on Exploration Mission-1.
STS-28 Columbia, OV-102, terminal countdown demonstration test (TCDT) at KSC
1989-07-18
S89-41093 (9 Aug 1989) --- STS-28 Columbia, Orbiter Vehicle (OV) 102, mission specialist David C. Leestma relaxes in chair after donning launch and entry suit (LES) and launch and entry helmet (LEH). Technician in the background monitors LES systems. Leestma, along with fellow crewmembers, is participating in the terminal countdown demonstration test (TCDT) at the Kennedy Space Center (KSC) Operations and Checkout (O&C) Building. View provided by KSC with alternate number KSC-89PC-673.
2017-10-23
Lockheed Martin engineers and technicians prepare the Orion heat shield for Exploration Mission-1 for its move to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The heat shield will undergo a thermal cycle test to verify acceptable workmanship and material quality. The test serves to verify the heat shield's thermal protection systems have been manufactured and assembled correctly. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
Low-Pressure Capability of NASA Glenn's 10- by 10-Foot Supersonic Wind Tunnel Expanded
NASA Technical Reports Server (NTRS)
Roeder, James W.
2004-01-01
Extremely low dynamic pressure Q conditions are desired for space-related research including the testing of parachute designs and other decelerator concepts for future vehicles landing on Mars. Therefore, the low-pressure operating capability of the Abe Silverstein 10- by 10-foot Supersonic Wind Tunnel (10 10 SWT) at NASA Glenn Research Center was recently increased. Successful checkout tests performed in the fall of 2002 showed significantly reduced minimum operating pressures in the wind tunnel.
High-level neutron coincidence counter maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swansen, J.; Collinsworth, P.
1983-05-01
High-level neutron coincidence counter operational (field) calibration and usage is well known. This manual makes explicit basic (shop) check-out, calibration, and testing of new units and is a guide for repair of failed in-service units. Operational criteria for the major electronic functions are detailed, as are adjustments and calibration procedures, and recurrent mechanical/electromechanical problems are addressed. Some system tests are included for quality assurance. Data on nonstandard large-scale integrated (circuit) components and a schematic set are also included.
NASA Technical Reports Server (NTRS)
1972-01-01
Guidelines are presented for incorporation of the onboard checkout and monitoring function (OCMF) into the designs of the space shuttle propulsion systems. The guidelines consist of and identify supporting documentation; requirements for formulation, implementation, and integration of OCMF; associated compliance verification techniques and requirements; and OCMF terminology and nomenclature. The guidelines are directly applicable to the incorporation of OCMF into the design of space shuttle propulsion systems and the equipment with which the propulsion systems interface. The techniques and general approach, however, are also generally applicable to OCMF incorporation into the design of other space shuttle systems.
Performance Evaluation of Reliable Multicast Protocol for Checkout and Launch Control Systems
NASA Technical Reports Server (NTRS)
Shu, Wei Wennie; Porter, John
2000-01-01
The overall objective of this project is to study reliability and performance of Real Time Critical Network (RTCN) for checkout and launch control systems (CLCS). The major tasks include reliability and performance evaluation of Reliable Multicast (RM) package and fault tolerance analysis and design of dual redundant network architecture.
Software development guidelines
NASA Technical Reports Server (NTRS)
Kovalevsky, N.; Underwood, J. M.
1979-01-01
Analysis, modularization, flowcharting, existing programs and subroutines, compatibility, input and output data, adaptability to checkout, and general-purpose subroutines are summarized. Statement ordering and numbering, specification statements, variable names, arrays, arithemtical expressions and statements, control statements, input/output, and subroutines are outlined. Intermediate results, desk checking, checkout data, dumps, storage maps, diagnostics, and program timing are reviewed.
Large-Scale Implementation of Check-In, Check-Out: A Descriptive Study
ERIC Educational Resources Information Center
Hawken, Leanne S.; Bundock, Kaitlin; Barrett, Courtenay A.; Eber, Lucille; Breen, Kimberli; Phillips, Danielle
2015-01-01
Check-In, Check-Out (CICO) is one of the most widely implemented Tier 2 behavior interventions in a school-wide system of Positive Behavior Interventions and Supports (PBIS). Much literature has documented implementation of CICO across individual schools or districts. The Illinois PBIS Network, currently known as the Midwest PBIS Network, has…
A Systematic Review of the Empirical Support for Check-in Check-Out
ERIC Educational Resources Information Center
Wolfe, Katie; Pyle, Daniel; Charlton, Cade T.; Sabey, Christian V.; Lund, Emily M.; Ross, Scott W.
2016-01-01
Tier 2 interventions play an important role within the Positive Behavioral Interventions and Supports framework, bridging the gap between schoolwide Tier 1 interventions and individualized Tier 3 supports. Check-in Check-out (CICO) is a promising Tier 2 intervention for addressing mild problem behavior and potentially preventing the need for more…
ERIC Educational Resources Information Center
Ruiz, María Isolina; Smith, Traci N.; Naquin, Gale M.; Morgan-D'Atrio, Cynthia; Dellinger, Amy B.
2014-01-01
Implementation fidelity is crucial to the success of behavioral interventions. However, measuring and maintaining intervention implementation fidelity in schools' natural settings can be challenging. This article reports findings from a study examining the implementation fidelity of check-in check-out interventions at an urban school district…
A guide to onboard checkout. Volume 6: Structures/mechanics
NASA Technical Reports Server (NTRS)
1971-01-01
The structures and mechanical subsystem of a space station are considered. The subsystem includes basic structure (pressurization, equipment support, meteoroid protection, radiators, insulation, and docking interfaces), the docking mechanisms, spacecraft access (hatches, airlocks, and view ports), and antenna deployment mechanisms. Checkout is discussed in terms of reliability, failure analysis, and maintenance.
Kistler reusable vehicle facility design and operational approach
NASA Astrophysics Data System (ADS)
Fagan, D.; McInerney, F.; Johnston, C.; Tolson, B.
Kistler Aerospace Corporation is designing and developing the K-1, the world's first fully reusable aerospace vehicle to deliver satellites into orbit. The K-1 vehicle test program will be conducted in Woomera, Australia, with commercial operations scheduled to begin shortly afterwards. Both stages of the K-1 will return to the launch site utilizing parachutes and airbags for a soft landing within 24 h after launch. The turnaround flow of the two stages will cycle from landing site to a maintenance/refurbishment facility and through the next launch in only 9 days. Payload processing will occur in a separate facility in parallel with recovery and refurbishment operations. The vehicle design and on-board checkout capability of the avionics system eliminates the need for an abundance of ground checkout equipment. Payload integration, vehicle assembly, and K-1 transport to the launch pad will be performed horizontally, simplifying processing and reducing infrastructure requirements. This simple, innovative, and cost-effective approach will allow Kistler to offer its customers flexible, low-cost, and on-demand launch services.
PROPULSE 980: A Hydrogen Peroxide Enrichment System
NASA Technical Reports Server (NTRS)
Boxwell, Robert; Bromley, G.; Wanger, Robert; Pauls, Dan; Maynard, Bryon; McNeal, Curtis; Dumbacher, D. L. (Technical Monitor)
2000-01-01
The PROPULSE 980 unit is a transportable processing plant that enriches aerospace grade hydrogen peroxide from 90% to 98% final concentration. The unit was developed by Degussa-H Is, in cooperation with Orbital, NASA Marshall Space Center, and NASA Stennis Space Center. The system is a self-contained unit that houses all of the process equipment, instrumentation and controls to perform the concentration operation nearly autonomously. It is designed to produce non-bulk quantities of 98% hydrogen peroxide. The enrichment unit design also maintains system, personnel and environmental safety during all aspects of the enrichment process and final product storage. As part of the Propulse 980 checkout and final buyoff, it will be disassembled at the Degussa-H Is Corporation plant in Theodore, AL, transported to the Stennis Space Center, reassembled and subjected to a series of checkout tests to verify design objectives have been met. This paper will summarize the basic project elements and provide an update on the present status of the project.
NASA Technical Reports Server (NTRS)
Pritchard, E. I.
1977-01-01
The spaceborne testing equipment carried by the orbiter and the measuring equipment onboard the satellite (telemetry) is tested to verify that each is operating satisfactorily. The satellite command system is also checked. Thermal stabilization with the satellite in the orbiter shadow is achieved in six to eight hours. Satellite subsystem tests are run, and thermal control by heaters is checked. Thermal stabilization with the satellite exposed to the sun (when the orbiter is in sunlight) is again achieved in an estimated six to eight hours. Subsystem tests are again run in the hot condition, and heat rejection tests are made.
NASA Technical Reports Server (NTRS)
1976-01-01
The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.
STS-34 Commander Williams in KSC O and C Bldg prepares for TCDT activities
NASA Technical Reports Server (NTRS)
1989-01-01
STS-34 Commander Donald E. Williams is assisted by technicians with donning his launch and entry suit (LES) in the Kennedy Space Center (KSC) Operations and Checkout (O and C) Building prior to leaving for Launch Complex (LC) Pad 39B during terminal countdown demonstration test (TCDT) activities. Williams also catches a few minutes of relaxation while reclining in his chair.
2001-07-14
The solar-electric Helios Prototype flying wing is shown near the Hawaiian islands of Niihau and Lehua during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2001-07-14
The solar-electric Helios Prototype flying wing is shown near the Hawaiian island of Niihau during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2001-07-14
The solar-electric Helios Prototype flying wing is shown near the Hawaiian island of Niihau during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2001-07-14
The solar-electric Helios Prototype flying wing is shown near the Hawaiian islands of Niihau and Lehua during its first test flight on solar power from the U.S. Navy's Pacific Missile Range Facility on Kauai, Hawaii, July 14, 2001. The 18-hour flight was a functional checkout of the aircraft's systems and performance in preparation for an attempt to reach sustained flight at 100,000 feet altitude later this summer.
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-06
CAPE CANAVERAL, Fla. – Technicians lower a special fixture around an Orion spacecraft inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-06
CAPE CANAVERAL, Fla. – Technicians lower a special fixture around an Orion spacecraft inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-06
CAPE CANAVERAL, Fla. – A special fixture stands in place around an Orion spacecraft inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
2012-12-05
CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs
40 CFR 86.213-11 - Fuel specifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.213-11 Fuel specifications. (a) Gasoline... the text in this section follows: Table—Cold CO Fuel Specifications Item ASTM test Cold CO low octane.... Diesel test fuel used for cold temperature FTP testing under part 600 of this chapter must be a winter...
40 CFR 86.213-11 - Fuel specifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.213-11 Fuel specifications. (a) Gasoline... the text in this section follows: Table—Cold CO Fuel Specifications Item ASTM test Cold CO low octane.... Diesel test fuel used for cold temperature FTP testing under part 600 of this chapter must be a winter...
40 CFR 86.213-11 - Fuel specifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.213-11 Fuel specifications. (a) Gasoline... the text in this section follows: Table—Cold CO Fuel Specifications Item ASTM test Cold CO low octane.... Diesel test fuel used for cold temperature FTP testing under part 600 of this chapter must be a winter...
40 CFR 86.213-11 - Fuel specifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.213-11 Fuel specifications. (a) Gasoline... the text in this section follows: Table—Cold CO Fuel Specifications Item ASTM test Cold CO low octane.... Diesel test fuel used for cold temperature FTP testing under part 600 of this chapter must be a winter...
Processing and Preparation of Advanced Stirling Convertors for Extended Operation
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Paggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Peggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
Large liquid rocket engine transient performance simulation system
NASA Technical Reports Server (NTRS)
Mason, J. R.; Southwick, R. D.
1989-01-01
Phase 1 of the Rocket Engine Transient Simulation (ROCETS) program consists of seven technical tasks: architecture; system requirements; component and submodel requirements; submodel implementation; component implementation; submodel testing and verification; and subsystem testing and verification. These tasks were completed. Phase 2 of ROCETS consists of two technical tasks: Technology Test Bed Engine (TTBE) model data generation; and system testing verification. During this period specific coding of the system processors was begun and the engineering representations of Phase 1 were expanded to produce a simple model of the TTBE. As the code was completed, some minor modifications to the system architecture centering on the global variable common, GLOBVAR, were necessary to increase processor efficiency. The engineering modules completed during Phase 2 are listed: INJTOO - main injector; MCHBOO - main chamber; NOZLOO - nozzle thrust calculations; PBRNOO - preburner; PIPE02 - compressible flow without inertia; PUMPOO - polytropic pump; ROTROO - rotor torque balance/speed derivative; and TURBOO - turbine. Detailed documentation of these modules is in the Appendix. In addition to the engineering modules, several submodules were also completed. These submodules include combustion properties, component performance characteristics (maps), and specific utilities. Specific coding was begun on the system configuration processor. All functions necessary for multiple module operation were completed but the SOLVER implementation is still under development. This system, the Verification Checkout Facility (VCF) allows interactive comparison of module results to store data as well as provides an intermediate checkout of the processor code. After validation using the VCF, the engineering modules and submodules were used to build a simple TTBE.
43. View of CSMR room equipment locator and system checkout ...
43. View of CSMR room equipment locator and system checkout console for detection radars and rearward communication data links in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
13. VIEW FROM COLD CALIBRATION BLOCKHOUSE LOOKING DOWN CONNECTING TUNNEL ...
13. VIEW FROM COLD CALIBRATION BLOCKHOUSE LOOKING DOWN CONNECTING TUNNEL TO COLD CALIBRATION TEST STAND BASEMENT, SHOWING HARD WIRE CONNECTION (INSTRUMENTATION AND CONTROL). - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
2. VIEW NORTHWEST FROM LEFT TO RIGHT: COLD CALIBRATION BLOCKHOUSE, ...
2. VIEW NORTHWEST FROM LEFT TO RIGHT: COLD CALIBRATION BLOCKHOUSE, COLD CALIBRATION TEST STAND FOR FL ENGINE FOR SATURN V. EXHAUST DUCT IN FOREGROUND. - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
NASA electronic message experiment and study: Detailed test plans
NASA Technical Reports Server (NTRS)
1979-01-01
A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.
2017-11-17
A crane is being prepared for use during move operations of the Orion crew module for Exploration Mission-1 to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
2017-11-17
Technicians check a crane that will be used during move operations of the Orion crew module for Exploration Mission-1 to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
Implementation of an Outer Can Welding System for Savannah River Site FB-Line
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howard, S.R.
2003-03-27
This paper details three phases of testing to confirm use of a Gas Tungsten Arc (GTA) system for closure welding the 3013 outer container used for stabilization/storage of plutonium metals and oxides. The outer container/lid closure joint was originally designed for laser welding, but for this application, the gas tungsten arc (GTA) welding process has been adapted. The testing progressed in three phases: (1) system checkout to evaluate system components for operational readiness, (2) troubleshooting to evaluate high weld failure rates and develop corrective techniques, and (3) pre-installation acceptance testing.
2017-11-17
Technicians prepare a crane for use during move operations of the Orion crew module for Exploration Mission-1 to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
Cell module and fuel conditioner
NASA Technical Reports Server (NTRS)
Hoover, D. Q., Jr.
1980-01-01
Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.
Definition of ground test for Large Space Structure (LSS) control verification
NASA Technical Reports Server (NTRS)
Waites, H. B.; Doane, G. B., III; Tollison, D. K.
1984-01-01
An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.
Requirement for a standard language for test and ground operations
NASA Technical Reports Server (NTRS)
Medlock, J. R.
1971-01-01
The basic requirements for a standard test and checkout language applicable to all phases of the space shuttle test and ground operations are determined. The general characteristics outlined here represent the integration of selected ideas and concepts from operational elements within Kennedy Space Center (KSC) that represent diverse disciplines associated with space vehicle testing and launching operations. Special reference is made to two studies conducted in this area for KSC as authorized by the Advanced Development Element of the Office of Manned Space Flight (MSF). Information contained in reports from these studies have contributed significantly to the final selection of language features depicted in this technical report.
ERIC Educational Resources Information Center
Russell, Ralph E.; And Others
The relationship between student demand for library books by subject area and the students' majors and courses undertaken was studied using a library's automated circulation system. During 1980-1982, book checkout at the university library declined 22 percent. History had the greatest decline in checkouts per student. Other fields with larger…
ERIC Educational Resources Information Center
Hawken, Leanne S.; Bundock, Kaitlin; Kladis, Kristin; O'Keeffe, Breda; Barret, Courtenay A.
2014-01-01
The purpose of this systematic literature review was to summarize outcomes of the Check-in Check-out (CICO) intervention across elementary and secondary settings. Twenty-eight studies utilizing both single subject and group (experimental and quasi-experimental) designs were included in this review. Median effect sizes across the eight group…
9. COLD CALIBRATION TEST STAND (H1) FROM LEFT TO RIGHT ...
9. COLD CALIBRATION TEST STAND (H-1) FROM LEFT TO RIGHT - WORK BENCH, CONTROL PANEL, CHEMICAL TANK. - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
Leadership Development Program Final Project
NASA Technical Reports Server (NTRS)
Parrish, Teresa C.
2016-01-01
TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.
2017-10-23
Technicians move the Orion heat shield for Exploration Mission-1 toward the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Protective pads are being attached to the heat shield surface. The heat shield will undergo a thermal cycle test to verify acceptable workmanship and material quality. The test also serves to verify the heat shield's thermal protection systems have been manufactured and assembled correctly. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
National Transonic Facility status
NASA Technical Reports Server (NTRS)
Mckinney, L. W.; Bruce, W. E., Jr.; Gloss, B. B.
1989-01-01
The National Transonic Facility (NTF) was operational in a combined checkout and test mode for about 3 years. During this time there were many challenges associated with movement of mechanical components, operation of instrumentation systems, and drying of insulation in the cryogenic environment. Most of these challenges were met to date along with completion of a basic flow calibration and aerodynamic tests of a number of configurations. Some of the major challenges resulting from cryogenic environment are reviewed with regard to hardware systems and data quality. Reynolds number effects on several configurations are also discussed.
JSC technician checks STS-44 DSO 316 bioreactor and rotating wall vessel hdwr
NASA Technical Reports Server (NTRS)
1991-01-01
JSC technician Tacey Prewitt checks the progress on a bioreactor experiment in JSC's Life Sciences Laboratory Bldg 37 biotechnology laboratory. Similar hardware is scheduled for testing aboard Atlantis, Orbiter Vehicle (OV) 104, during STS-44. Detailed Supplementary Objective (DSO) 316 Bioreactor/Flow and Particle Trajectory in Microgravity will checkout the rotating wall vessel hardware and hopefully will confirm researchers' theories and calculations about how flow fields work in space. Plastic beads of various sizes rather than cell cultures are being flown in the vessel for the STS-44 test.
2013-08-21
CAPE CANAVERAL, Fla. – Technicians work with the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser
Interface Message Processors for the ARPA Computer Network
1975-04-01
Pluribus IMP construction and checkout; sizeable changes to the i*4P message-processing algorithms: and Satellite IMP issues. The IMP message...extremely low cost modification design. We have begun to consider changes to the MLC design which would enable the MLC to suppress continuous breaks...existing authentication mechanisms need not make these changes . 2.7 Other Topics During the first quarter BBN constructed an environmental test chamber
1971-04-01
This photograph shows Skylab's Extreme Ultraviolet (XUV) Spectroheliograph during an acceptance test and checkout procedures in April 1971. The unit was an Apollo Telescope Mount (ATM) instrument designed to sequentially photograph the solar chromosphere and corona in selected ultraviolet wavelengths. The instrument also obtained information about composition, temperature, energy conversion and transfer, and plasma processes of the chromosphere and lower corona. The Marshall Space Flight Center had program management responsibility for the development of Skylab hardware and experiments.
NASA Technical Reports Server (NTRS)
1975-01-01
A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.
The Author’s Guide To Writing 412th Test Wing Technical Reports
2014-12-01
control CAD computer aided design cc cubic centimeters C.O. carry-over c/o checkout USAF United States Air Force C1 rolling moment coefficient...cooling air. Mission Impact: Results in maintenance inability to reliably duplicate and isolate valid aircraft failures, and degrades reliability...air. Mission Impact: Results in maintenance inability to reliably duplicate and isolate valid aircraft failures, and degrades reliability of system
LV software support for supersonic flow analysis
NASA Technical Reports Server (NTRS)
Bell, William A.
1991-01-01
During 1991, the software developed allowed an operator to configure and checkout the TSI, Inc. laser velocimeter (LV) system prior to a run. This setup procedure established the operating conditions for the TSI MI-990 multichannel interface and the RMR-1989 rotating machinery resolver. In addition to initializing the instruments, the software package provides a means of specifying LV calibration constants, controlling the sampling process, and identifying the test parameters.
2003-06-26
VANDENBERG AIR FORCE BASE, CALIF. - The SciSat-1 spacecraft is revealed at Vandenberg Air Force Base, Calif. Sci-Sat, which will undergo instrument checkout and spacecraft functional testing, weighs approximately 330 pounds and after launch will be placed in a 400-mile-high polar orbit to investigate processes that control the distribution of ozone in the upper atmosphere. The data from the satellite will provide Canadian and international scientists with improved measurements relating to global ozone processes and help policymakers assess existing environmental policy and develop protective measures for improving the health of our atmosphere, preventing further ozone depletion. The mission is designed to last two years.
2003-06-26
VANDENBERG AIR FORCE BASE, CALIF.- The cover is being lifted off SciSat-1 spacecraft at Vandenberg Air Force Base, Calif. Sci-Sat, which will undergo instrument checkout and spacecraft functional testing, weighs approximately 330 pounds and after launch will be placed in a 400-mile-high polar orbit to investigate processes that control the distribution of ozone in the upper atmosphere. The data from the satellite will provide Canadian and international scientists with improved measurements relating to global ozone processes and help policymakers assess existing environmental policy and develop protective measures for improving the health of our atmosphere, preventing further ozone depletion. The mission is designed to last two years.
2004-02-10
KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello moves away from its stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - Overhead cables carry the Multi-Purpose Logistics Module Donatello from the payload canister (lower right) to a work stand in the Space Station Processing Facility. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility secure the Multi-Purpose Logistics Module Raffaello onto a new work stand. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It has been moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-13
KENNEDY SPACE CENTER, FLA. - Workers on the floor of the Space Station Processing Facility watch as overhead cables carry the Multi-Purpose Logistics Module Donatello to a work stand. Previously housed in the Operations and Checkout Building, Donatello was brought into the SSPF for routine testing. This is the first time all three MPLMs (Donatello, Raffaello and Leonardo) are in the SSPF. The MPLMs were built by the Italian Space Agency, to serve as reusable logistics carriers and the primary delivery system to resupply and return station cargo requiring a pressurized environment. The third MPLM, Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
Nutrition Report Cards: An Opportunity to Improve School Lunch Selection
Wansink, Brian; Just, David R.; Patterson, Richard W.; Smith, Laura E.
2013-01-01
Objective To explore the feasibility and implementation efficiency of Nutritional Report Cards(NRCs) in helping children make healthier food choices at school. Methods Pilot testing was conducted in a rural New York school district (K-12). Over a five-week period, 27 parents received a weekly e-mail containing a NRC listing how many meal components (fruits, vegetables, starches, milk), snacks, and a-la-carte foods their child selected. We analyzed choices of students in the NRC group vs. the control group, both prior to and during the intervention period. Point-of-sale system data for a-la-carte items was analyzed using Generalized Least Squares regressions with clustered standard errors. Results NRCs encouraged more home conversations about nutrition and more awareness of food selections. Despite the small sample, the NRC was associated with reduced selection of some items, such as the percentage of those selecting cookies which decreased from 14.3 to 6.5 percent. Additionally, despite requiring new keys on the check-out registers to generate the NRC, checkout times increased by only 0.16 seconds per transaction, and compiling and sending the NRCs required a total weekly investment of 30 minutes of staff time. Conclusions This test of concept suggests that NRCs are a feasible and inexpensive tool to guide children towards healthier choices. PMID:24098324
Nutrition Report Cards: an opportunity to improve school lunch selection.
Wansink, Brian; Just, David R; Patterson, Richard W; Smith, Laura E
2013-01-01
To explore the feasibility and implementation efficiency of Nutritional Report Cards (NRCs) in helping children make healthier food choices at school. Pilot testing was conducted in a rural New York school district (K-12). Over a five-week period, 27 parents received a weekly e-mail containing a NRC listing how many meal components (fruits, vegetables, starches, milk), snacks, and a-la-carte foods their child selected. We analyzed choices of students in the NRC group vs. the control group, both prior to and during the intervention period. Point-of-sale system data for a-la-carte items was analyzed using Generalized Least Squares regressions with clustered standard errors. NRCs encouraged more home conversations about nutrition and more awareness of food selections. Despite the small sample, the NRC was associated with reduced selection of some items, such as the percentage of those selecting cookies which decreased from 14.3 to 6.5 percent. Additionally, despite requiring new keys on the check-out registers to generate the NRC, checkout times increased by only 0.16 seconds per transaction, and compiling and sending the NRCs required a total weekly investment of 30 minutes of staff time. This test of concept suggests that NRCs are a feasible and inexpensive tool to guide children towards healthier choices.
MIUS Integration and Subsystem Test (MIST) data system
NASA Technical Reports Server (NTRS)
Pringle, L. M.
1977-01-01
A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.
Automotive Stirling engine development program
NASA Technical Reports Server (NTRS)
Ernst, W.; Richey, A.; Farrell, R.; Riecke, G.; Smith, G.; Howarth, R.; Cronin, M.; Simetkosky, M.; Meacher, J.
1986-01-01
This is the ninth Semiannual Technical Progress Report prepared under the Automotive Stirling Engine Development Program. It covers the twenty-eighth and twenty-ninth quarters of activity after award of the contract. Quarterly Technical Progress Reports related program activities from the first through the thirteenth quarters; thereafter, reporting was changed to a Semiannual format. This report summarizes the study of higher-power kinematic Stirling engines for transportation use, development testing of Mod I Stirling engines, and component development activities. Component development testing included successful conical fuel nozzle testing and functional checkout of Mod II controls and auxiliaries on Mod I engine test beds. Overall program philosophy is outlined and data and test results are presented.
5. VIEW NORTHWEST FROM LEFT TO RIGHT: COLD CALIBRATION OBSERVATION ...
5. VIEW NORTHWEST FROM LEFT TO RIGHT: COLD CALIBRATION OBSERVATION BUNKER BACKGROUND, COLD CALIBRATION TOWER. - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
Analysis of responses of cold pressor tests on pilots and executives
NASA Technical Reports Server (NTRS)
Swaroop, R.
1977-01-01
Statistical analyses were performed to study the relationship between cold pressor test responses and certain medical attributes of a group of 81 pilots and a group of 466 executives. The important results of this study were as follows: There was a significant relationship between a subject's cold pressor test response and his profession (that is, pilot or executive). The executives' diastolic cold pressor test responses were significantly related to their medical conditions, and their families' medical conditions. Significant relationships were observed between executives' diastolic and systolic cold pressor test responses and their history of tranquilizer and cardiac drug use.
Cold Stress and the Cold Pressor Test
ERIC Educational Resources Information Center
Silverthorn, Dee U.; Michael, Joel
2013-01-01
Temperature and other environmental stressors are known to affect blood pressure and heart rate. In this activity, students perform the cold pressor test, demonstrating increased blood pressure during a 1- to 2-min immersion of one hand in ice water. The cold pressor test is used clinically to evaluate autonomic and left ventricular function. This…
A guide to onboard checkout. Volume 5: Data management
NASA Technical Reports Server (NTRS)
1971-01-01
The baseline data management subsystem for a space station is discussed. The subsystem consists of equipment necessary to transfer, store, and process data to and from users and subsystems. It acquires and conditions a wide variety of input data from experiments, vehicle subsystems sensors, uplinked ground communications, and astronaut-activated controls. Computer techniques for failure analysis, reliability, and maintenance checkout onboard the space station are considered.
Tactical Satellite-3 Mission Overview and Initial Lessons Learned (Postprint)
2013-03-01
current buses. The spacecraft bus includes the main structure; attitude control system (reaction wheels and torque rods); the thermal protection...Specific key areas are the relatively rapid checkout of the spacecraft and lessons from the responsive space development. 15. SUBJECT TERMS...relatively rapid checkout of the spacecraft and lessons from the responsive space development. INTRODUCTION The Tactical Satellite 3 mission was a
Design and application of a test rig for super-critical power transmission shafts
NASA Technical Reports Server (NTRS)
Darlow, M.; Smalley, A.
1979-01-01
The design, assembly, operational check-out and application of a test facility for testing supercritical power transmission shafts under realistic conditions of size, speed and torque are described. Alternative balancing methods and alternative damping mechanisms are demonstrated and compared. The influence of torque upon the unbalance distribution is studied, and its effect on synchronous vibrations is investigated. The feasibility of operating supercritical power transmission shafting is demonstrated, but the need for careful control, by balancing and damping, of synchronous and nonsynchronous vibrations is made clear. The facility was demonstrated to be valuable for shaft system development programs and studies for both advanced and current-production hardware.
Wind-turbine-performance assessment
NASA Astrophysics Data System (ADS)
Vachon, W. A.
1982-06-01
An updated summary of recent test data and experiences is reported from both federally and privately funded large wind turbine (WT) development and test programs, and from key WT programs in Europe. Progress and experiences on both the cluster of three MOD-2 2.5-MW WT's, the MOD-1 2-MW WT, and other WT installations are described. An examination of recent test experiences and plans from approximately five privately funded large WT programs in the United States indicates that, during machine checkout and startup, technical problems are identified, which require and startup, a number of technical problems are identified, which will require design changes and create program delays.
Model-Based Fault Diagnosis for Turboshaft Engines
NASA Technical Reports Server (NTRS)
Green, Michael D.; Duyar, Ahmet; Litt, Jonathan S.
1998-01-01
Tests are described which, when used to augment the existing periodic maintenance and pre-flight checks of T700 engines, can greatly improve the chances of uncovering a problem compared to the current practice. These test signals can be used to expose and differentiate between faults in various components by comparing the responses of particular engine variables to the expected. The responses can be processed on-line in a variety of ways which have been shown to reveal and identify faults. The combination of specific test signals and on-line processing methods provides an ad hoc approach to the isolation of faults which might not otherwise be detected during pre-flight checkout.
STS-44 DS0 316, Bioreactor/Flow and Particle Trajectory in Microgravity, hdwr
NASA Technical Reports Server (NTRS)
1991-01-01
STS-44 Detailed Supplementary Objective (DSO) 316, Bioreactor/Flow and Particle Trajectory in Microgravity, rotating wall vessels are stored in an incubator in JSC's Life Sciences Laboratory Bldg 37 Biotechnology Laboratories. The rotating wall vessel hardware will receive its first test and equipment checkout on the middeck of Atlantis, Orbiter Vehicle (OV) 104, during the STS-44 mission. The vessel hardware will be used in a test that researchers hope will confirm their theories and calculations about how the flow fields work in space. Plastic beads of various sizes rather than cell cultures are being flown in the vessel for the STS-44 test.
Solar residential heating and cooling system development test program
NASA Technical Reports Server (NTRS)
Humphries, W. R.; Melton, D. E.
1974-01-01
A solar heating and cooling system is described, which was installed in a simulated home at Marshall Space Flight Center. Performance data are provided for the checkout and initial operational phase for key subsystems and for the total system. Valuable information was obtained with regard to operation of a solar cooling system during the first summer of operation. Areas where improvements and modifications are required to optimize such a system are discussed.
YF-12 cooperative airframe/propulsion control system program, volume 1
NASA Technical Reports Server (NTRS)
Anderson, D. L.; Connolly, G. F.; Mauro, F. M.; Reukauf, P. J.; Marks, R. (Editor)
1980-01-01
Several YF-12C airplane analog control systems were converted to a digital system. Included were the air data computer, autopilot, inlet control system, and autothrottle systems. This conversion was performed to allow assessment of digital technology applications to supersonic cruise aircraft. The digital system was composed of a digital computer and specialized interface unit. A large scale mathematical simulation of the airplane was used for integration testing and software checkout.
A Structural Weight Estimation Program (SWEEP) for Aircraft. Volume IX - User’s Manual. Appendix A
1974-06-01
n oso> o o M ~**4( Mru ^ ^- m «a — * ^^^ ^ MM mMMMM »*~« oooooeooe ♦ ♦♦♦♦♦♦♦♦ Ui Ul UI UJ UI UI UIUIUI oo ODOOO ooo 00^*000000 OOMOOOOOO OO...NACFLLF GROUP 312».Tt C 1«! TEST CASF FOR NtM WING PPUGRAH CHECKOUT C 1*1 TESI CASE NO. 1 -~ .. . AUGUST 1973
CF6-6D engine short-term performance deterioration
NASA Technical Reports Server (NTRS)
Kramer, W. H.; Paas, J. E.; Smith, J. J.; Wulf, R. H.
1980-01-01
Studies conducted as part of the NASA-Lewis CF6 jet engine diagnostics program are summarized. An 82-engine sample of DC-10-10 aircraft engine checkout data that were gathered to define the extent and magnitude of CF6-6D short term performance deterioration were analyzed. These data are substantiated by the performance testing and analytical teardown of CF6-6D short term deterioration engine serial number (ESN) 451507.
Fowler, Sara; Fullmer, Spencer; Drum, Melissa; Reader, Al
2014-12-01
The purpose of this prospective randomized, double-blind, placebo-controlled study was to determine the effects of a combination dose of 1000 mg acetaminophen/10 mg hydrocodone on cold pulpal testing in patients experiencing symptomatic irreversible pulpitis. One hundred emergency patients in moderate to severe pain diagnosed with symptomatic irreversible pulpitis of a mandibular posterior tooth randomly received, in a double-blind manner, identical capsules of either a combination of 1000 mg acetaminophen/10 hydrocodone or placebo. Cold testing with Endo-Ice (1,1,1,2 tetrafluoroethane; Hygenic Corp, Akron, OH) was performed at baseline and every 10 minutes for 60 minutes. Pain to cold testing was recorded by the patient using a Heft-Parker visual analog scale. Patients' reaction to the cold application was also rated. Cold testing at baseline and at 10 minutes resulted in severe pain for both the acetaminophen/hydrocodone and placebo groups. Although pain ratings decreased from 20-60 minutes, the ratings still resulted in moderate pain. Patient reaction to cold testing showed that 56%-62% had a severe reaction. Although the reactions decreased in severity over the 60 minutes, 20%-34% still had severe reactions at 60 minutes. Regarding pain and patients' reactions to cold testing, there were no significant differences between the combination acetaminophen/hydrocodone and placebo groups at any time period. A combination dose of 1000 mg of acetaminophen/10 mg of hydrocodone did not statistically affect cold pulpal testing in patients presenting with symptomatic irreversible pulpitis. Patients experienced moderate to severe pain and reactions to cold testing. Copyright © 2014 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.
Salgar, Avinash Ramchandra; Singh, Shishir H; Podar, Rajesh S; Kulkarni, Gaurav P; Babel, Shashank N
2017-01-01
Pulp sensitivity testing, even with its limitations and shortcomings, has been and still remains a very helpful aid in endodontic diagnosis. Pulp sensitivity tests extrapolate pulpal health from the sensory response. The aim of the present study was to identify the sensitivity, specificity, positive and negative predictive values (NPVs) of thermal and electrical tests of pulp sensitivity. Pulp tests studied were two cold and heat tests respectively and electrical test. A total of 330 teeth were tested: 198 teeth with vital pulp and 132 teeth with necrotic pulps (disease prevalence of 40%). The ideal standard was established by observing bleeding within the pulp chamber. Sensitivity values of the diagnostic tests were 0.89 and 0.94 for cold test, 0.84 and 0.87 for the heat tests, and 0.75 for electrical pulp test and the specificity values of the diagnostic tests were 0.91 and 0.93 for the cold tests, 0.86 and 0.84 for the heat tests, and 0.90 for electrical pulp test. The NPVs were 0.91 and 0.96 for the cold tests, 0.89 and 0.91 for the heat tests, and 0.84 for electrical pulp test. The positive predictive values were 0.89 and 0.90 for the cold tests, 0.80 and 0.79 for the heat tests and 0.88 for electrical pulp test. The highest accuracy (0.9393) was observed with cold test (icy spray). The cold test done with icy spray was the most accurate method for sensitivity testing.
Optical data transmission technology for fixed and drag-on STS payload umbilicals, volume 2
NASA Technical Reports Server (NTRS)
St.denis, R. W.
1981-01-01
Optical data handling methods are studied as applicable to payload communications checkout and monitoring. Both payload umbilicals and interconnecting communication lines carrying payload data are examined for the following: (1) ground checkout requirements; (2) optical approach (technical survey of optical approaches, selection of optimum approach); (3) survey and select components; (4) compare with conventional approach; and (5) definition of follow on activity.
NASA Technical Reports Server (NTRS)
Dunn, Kevin H.; Bulgajewski, Peter J.
1992-01-01
Initial results of the integrated AR POST conducted by Boeing at Marshall Space Flight Center in 1992 are presented. The three baselined ECLSS Man Tended Capability AR assemblies were integrated and operated in a closed door chamber in which the internal atmosphere was monitored. The test provides a prerequisite checkout of the AR subsystem in preparation for longer duration tests in which the AR subsystem will be integrated with the Water Recovery Management subsystem. The integrated AR POST will serve as an early test bed to evaluate the integration of the space station ECLSS AR subsystem during design maturation.
2017-11-17
Technicians in clean-room suits attach a crane to the Orion crew module for Exploration Mission-1 for its move to the thermal chamber in the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Orion will be lifted out of a test stand and lowered onto another stand to for the move. The crew module will undergo a thermal cycle test to assess the workmanship of critical hardware and structural locations. The test also demonstrates crew module subsystem operations in a thermally stressing environment to confirm no damage or anomalous hardware conditions as a result of the test. The Orion spacecraft will launch atop NASA's Space Launch System rocket on its first uncrewed integrated flight.
Test plan. GCPS task 7, subtask 7.1: IHM development
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.
Definition study for an extended manned test of a regenerative life support system
NASA Technical Reports Server (NTRS)
1971-01-01
A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.
The Combined Effect of Cold and Moisture on Manual Performance.
Ray, Matthew; Sanli, Elizabeth; Brown, Robert; Ennis, Kerri Ann; Carnahan, Heather
2018-02-01
Objective The aim of this study was to investigate the combined effect of cold and moisture on manual performance and tactile sensitivity. Background People working in the ocean environment often perform manual work in cold and wet conditions. Although the independent effects of cold and moisture on hand function are known, their combined effect has not been investigated. Method Participants completed sensory (Touch-Test, two-point discrimination) and motor (Purdue Pegboard, Grooved Pegboard, reef knot untying) tests in the following conditions: dry hand, wet hand, cold hand, and cold and wet hand. Results For the Purdue Pegboard and knot untying tasks, the greatest decrement in performance was observed in the cold-and-wet-hand condition, whereas the decrements seen in the cold-hand and wet-hand conditions were similar. In the Grooved Pegboard task, the performance decrements exhibited in the cold-and-wet-hand condition and the cold-hand condition were similar, whereas no decrement was observed in the wet-hand condition. Tactile sensitivity was reduced in the cold conditions for the Touch-Test but not the two-point discrimination test. The combined effect of cold and moisture led to the largest performance decrements except when intrinsic object properties helped with grasp maintenance. The independent effects of cold and moisture on manual performance were comparable. Application Tools and equipment for use in the cold ocean environment should be designed to minimize the effects of cold and moisture on manual performance by including object properties that enhance grasp maintenance and minimize the fine-dexterity requirements.
Cold Regions - Environmental Testing of Individual Soldier Clothing
2011-10-17
Individual Soldier Clothing 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORS 5d. PROJECT NUMBER 5e. TASK...This Test Operations Procedure (TOP) provides testing guidelines for individual Soldier cold weather clothing and footwear in a cold regions...Soldier clothing , along with its safety, reliability, durability, and performance when exposed to a cold regions environment. 15. SUBJECT TERMS
JSC technician checks STS-44 DSO 316 bioreactor and rotating wall vessel hdwr
1991-06-27
S91-40049 (27 June 1991) --- JSC technician Tacey Prewitt checks the progress on a bioreactor experiment in JSC's Life Sciences Laboratory Bldg 37 biotechnology laboratory. Similar hardware is scheduled for testing aboard Atlantis, Orbiter Vehicle (OV) 104, during STS-44. Detailed Supplementary Objective (DSO) 316 Bioreactor/Flow and Particle Trajectory in Microgravity will checkout the rotating wall vessel hardware and hopefully will confirm researchers' theories and calculations about how flow fields work in space. Plastic beads of various sizes rather than cell cultures are being flown in the vessel for the STS-44 test.
Initial research program for the National Transonic Facility
NASA Technical Reports Server (NTRS)
Gloss, B. B.
1984-01-01
The construction and checkout of the National Transonic Facility (NTF) have been completed, and detailed calibration is now in progress. The initial NTF research program covers a wide range of study areas falling into three major elements: (1) the assessment of Reynolds number sensitivities for a broad range of configurations and flow phenomena; (2) validation of the ability of NTF to simulate full-scale aerodynamics; and (3) the development of test techniques for improved test simulations in existing wind tunnels. This paper, therefore, is a status report on these various elements of the initial NTF research program.
EMU processing - A myth dispelled
NASA Technical Reports Server (NTRS)
Peacock, Paul R.; Wilde, Richard C.; Lutz, Glenn C.; Melgares, Michael A.
1991-01-01
The refurbishment-and-checkout 'processing' activities entailed by the Space Shuttle Extravehicular Mobility Units (EMUs) are currently significantly more modest, at 1050 man-hours, than when Space Shuttle services began (involving about 4000 man-hours). This great improvement in hardware efficiency is due to the design or modification of test rigs for simplification of procedures, as well as those procedures' standardization, in conjunction with an increase in hardware confidence which has allowed the extension of inspection, service, and testing intervals. Recent simplification of the hardware-processing sequence could reduce EMU processing requirements to 600 man-hours in the near future.
STS-27 Atlantis, OV-104, terminal countdown demonstration test (TCDT) at KSC
NASA Technical Reports Server (NTRS)
1988-01-01
STS-27 Atlantis, Orbiter Vehicle (OV) 104, crewmembers participate in the terminal countdown demonstration test (TCDT) at the Kennedy Space Center (KSC). Commander Robert L. Gibson, waving to spectators and followed by Pilot Guy S. Gardner, Mission Specialist (MS) William M. Shepherd, MS Richard M. Mullane, and MS Jerry L. Ross, leads crew from the Operations and Checkout (O and C) Building to launch complex (LC) pad 39B. In the very back of the group and just exiting through doorway are Donald R. Puddy (left) and astronaut Daniel C. Brandenstein. Crewmembers are wearing launch and entry suits (LESs).
STS-27 Atlantis, OV-104, terminal countdown demonstration test (TCDT) at KSC
NASA Technical Reports Server (NTRS)
1988-01-01
STS-27 Atlantis, Orbiter Vehicle (OV) 104, crewmembers participate in the terminal countdown demonstration test (TCDT) at the Kennedy Space Center (KSC). Commander Robert L. Gibson, waving to spectators and followed by Pilot Guy S. Gardner, Mission Specialist (MS) William M. Shepherd, MS Richard M. Mullane, and MS Jerry L. Ross, leads crew from the Operations and Checkout (O and C) Building to ground transportation van. In the very back of the group and just exiting through doorway are Donald R. Puddy (left) and astronaut Daniel C. Brandenstein. Crewmembers are wearing orange launch and entry suits (LESs).
Pre-Test Analysis Predictions for the Shell Buckling Knockdown Factor Checkout Tests - TA01 and TA02
NASA Technical Reports Server (NTRS)
Thornburgh, Robert P.; Hilburger, Mark W.
2011-01-01
This report summarizes the pre-test analysis predictions for the SBKF-P2-CYL-TA01 and SBKF-P2-CYL-TA02 shell buckling tests conducted at the Marshall Space Flight Center (MSFC) in support of the Shell Buckling Knockdown Factor (SBKF) Project, NASA Engineering and Safety Center (NESC) Assessment. The test article (TA) is an 8-foot-diameter aluminum-lithium (Al-Li) orthogrid cylindrical shell with similar design features as that of the proposed Ares-I and Ares-V barrel structures. In support of the testing effort, detailed structural analyses were conducted and the results were used to monitor the behavior of the TA during the testing. A summary of predicted results for each of the five load sequences is presented herein.
STS-31 pre-deployment checkout of the Hubble Space Telescope (HST) on OV-103
1990-04-25
The Hubble Space Telescope (HST), grappled by Discovery's, Orbiter Vehicle (OV) 103's, remote manipulator system (RMS), is oriented in a 90 degree pitch position during STS-31 pre-deployment checkout procedures. The solar array (SA) panel (center) and high gain antennae (HGA) (on either side) are stowed along the Support System Module (SSM) forward shell prior to deployment. The sun highlights HST against the blackness of space.
STS 51-G crewmembers depart KSC's operations and checkout building
1985-05-20
51G-S-117 (17 June 1985) --- 51-G crewmembers depart the Kennedy Space Center's operations and checkout building on their way to the launch pad for the launch of the Discovery. Leading the seven are Daniel C. Brandenstein, commander; and John O. Creighton, pilot. Following are Payload specialist Sultan Salman Abdelazize Al-Saud; John M. Fabian, mission specialist; Patrick Baudry, payload specialist; Shannon Lucid and Steven R. Nagel, mission specialists.
Paying for Express Checkout: Competition and Price Discrimination in Multi-Server Queuing Systems
Deck, Cary; Kimbrough, Erik O.; Mongrain, Steeve
2014-01-01
We model competition between two firms selling identical goods to customers who arrive in the market stochastically. Shoppers choose where to purchase based upon both price and the time cost associated with waiting for service. One seller provides two separate queues, each with its own server, while the other seller has a single queue and server. We explore the market impact of the multi-server seller engaging in waiting cost-based-price discrimination by charging a premium for express checkout. Specifically, we analyze this situation computationally and through the use of controlled laboratory experiments. We find that this form of price discrimination is harmful to sellers and beneficial to consumers. When the two-queue seller offers express checkout for impatient customers, the single queue seller focuses on the patient shoppers thereby driving down prices and profits while increasing consumer surplus. PMID:24667809
Moreno-Duarte, Ingrid; Montenegro, Julio; Balonov, Konstantin; Schumann, Roman
2017-04-15
Most modern anesthesia workstations provide automated checkout, which indicates the readiness of the anesthesia machine. In this case report, an anesthesia machine passed the automated machine checkout. Minutes after the induction of general anesthesia, we observed a mismatch between the selected and delivered tidal volumes in the volume auto flow mode with increased inspiratory resistance during manual ventilation. Endotracheal tube kinking, circuit obstruction, leaks, and patient-related factors were ruled out. Further investigation revealed a broken internal insert within the CO2 absorbent canister that allowed absorbent granules to cause a partial obstruction to inspiratory and expiratory flow triggering contradictory alarms. We concluded that even when the automated machine checkout indicates machine readiness, unforeseen equipment failure due to unexpected events can occur and require providers to remain vigilant.
Paying for express checkout: competition and price discrimination in multi-server queuing systems.
Deck, Cary; Kimbrough, Erik O; Mongrain, Steeve
2014-01-01
We model competition between two firms selling identical goods to customers who arrive in the market stochastically. Shoppers choose where to purchase based upon both price and the time cost associated with waiting for service. One seller provides two separate queues, each with its own server, while the other seller has a single queue and server. We explore the market impact of the multi-server seller engaging in waiting cost-based-price discrimination by charging a premium for express checkout. Specifically, we analyze this situation computationally and through the use of controlled laboratory experiments. We find that this form of price discrimination is harmful to sellers and beneficial to consumers. When the two-queue seller offers express checkout for impatient customers, the single queue seller focuses on the patient shoppers thereby driving down prices and profits while increasing consumer surplus.
NASA Technical Reports Server (NTRS)
Bamberger, Helmut H.; Robinson, R. Craig; Jurns, John M.; Grasl, Steven J.
2011-01-01
Glenn Research Center s Creek Road Cryogenic Complex, Small Multi-Purpose Research Facility (SMiRF) recently completed validation / checkout testing of a new liquid methane delivery system and liquid methane (LCH4) conditioning system. Facility checkout validation was conducted in preparation for a series of passive thermal control technology tests planned at SMiRF in FY10 using a flight-like propellant tank at simulated thermal environments from 140 to 350K. These tests will validate models and provide high quality data to support consideration of LCH4/LO2 propellant combination option for a lunar or planetary ascent stage.An infrastructure has been put in place which will support testing of large amounts of liquid methane at SMiRF. Extensive modifications were made to the test facility s existing liquid hydrogen system for compatibility with liquid methane. Also, a new liquid methane fluid conditioning system will enable liquid methane to be quickly densified (sub-cooled below normal boiling point) and to be quickly reheated to saturation conditions between 92 and 140 K. Fluid temperatures can be quickly adjusted to compress the overall test duration. A detailed trade study was conducted to determine an appropriate technique to liquid conditioning with regard to the SMiRF facility s existing infrastructure. In addition, a completely new roadable dewar has been procured for transportation and temporary storage of liquid methane. A new spherical, flight-representative tank has also been fabricated for integration into the vacuum chamber at SMiRF. The addition of this system to SMiRF marks the first time a large-scale liquid methane propellant test capability has been realized at Glenn.This work supports the Cryogenic Fluid Management Project being conducted under the auspices of the Exploration Technology Development Program, providing focused cryogenic fluid management technology efforts to support NASA s future robotic or human exploration missions.
2011-09-14
Team members check the progress of a liquid nitrogen cold shock test on the A-1 Test Stand at Stennis Space Center on Sept. 15. The cold shock test is used to confirm the test stand's support system can withstand test conditions, when super-cold rocket engine propellant is piped. The A-1 Test Stand is preparing to conduct tests on the powerpack component of the J-2X rocket engine, beginning in early 2012.
2013-07-24
CAPE CANAVERAL, Fla. – Mark Hiebert, of the Running Zone, talks to a Kennedy worker during the National Employee Health and Fitness Day event in the Operations and Checkout Building's Mission Briefing Room. Employees also had the opportunity to be tested for diabetes, enter a raffle for prizes and get a five-minute massage. Other venders shown in the background are Sunseed Co-op’s Marcia Cooney, center, and Bridget Griffin from the YMCA of Titusville. Photo credit: NASA/Daniel Casper
2009-05-18
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building's high bay, technicians test how to put the "skins" on the outer mold of the simulator Orion crew module. Part of NASA's Constellation Program, the Orion spacecraft will return humans to the moon and prepare for future voyages to Mars and other destinations in our solar system. Orion is targeted to begin carrying humans to the International Space Station in 2015 and to the moon by 2020. Photo credit: NASA/Kim Shiflett
2009-05-18
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building's high bay, technicians begin testing how to put the "skins" on the outer mold of the simulator Orion crew module.Part of NASA's Constellation Program, the Orion spacecraft will return humans to the moon and prepare for future voyages to Mars and other destinations in our solar system. Orion is targeted to begin carrying humans to the International Space Station in 2015 and to the moon by 2020. Photo credit: NASA/Kim Shiflett
2009-05-18
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building's high bay, technicians test how to put the "skins" on the outer mold of the simulator Orion crew module. Part of NASA's Constellation Program, the Orion spacecraft will return humans to the moon and prepare for future voyages to Mars and other destinations in our solar system. Orion is targeted to begin carrying humans to the International Space Station in 2015 and to the moon by 2020. Photo credit: NASA/Kim Shiflett
2004-02-10
KENNEDY SPACE CENTER, FLA. - Workers watch as the Multi-Purpose Logistics Module Raffaello is lowered toward a work stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It has been moved across the floor to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello is lifted from its stand in the Space Station Processing Facility to move to another work stand. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - A worker on the floor watches as the Multi-Purpose Logistics Module Raffaello moves toward another work stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It has been moved across the floor to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Multi-Purpose Logistics Module Raffaello glides above the floor as it moves to another stand on the other side. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Multi-Purpose Logistics Module Raffaello in order to move it to another work stand in the Space Station Processing Facility. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
2004-02-10
KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility prepare to release the overhead crane from the Multi-Purpose Logistics Module Raffaello now secure on a new work stand. Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment. It has been moved to allow the third MPLM, Donatello, to be brought in for routine testing. Donatello has been stored in the Operations and Checkout Building. This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo. Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.
Bansal, Sheel; St Clair, J Bradley; Harrington, Constance A; Gould, Peter J
2015-10-01
The success of conifers over much of the world's terrestrial surface is largely attributable to their tolerance to cold stress (i.e., cold hardiness). Due to an increase in climate variability, climate change may reduce conifer cold hardiness, which in turn could impact ecosystem functioning and productivity in conifer-dominated forests. The expression of cold hardiness is a product of environmental cues (E), genetic differentiation (G), and their interaction (G × E), although few studies have considered all components together. To better understand and manage for the impacts of climate change on conifer cold hardiness, we conducted a common garden experiment replicated in three test environments (cool, moderate, and warm) using 35 populations of coast Douglas-fir (Pseudotsuga menziesii var. menziesii) to test the hypotheses: (i) cool-temperature cues in fall are necessary to trigger cold hardening, (ii) there is large genetic variation among populations in cold hardiness that can be predicted from seed-source climate variables, (iii) observed differences among populations in cold hardiness in situ are dependent on effective environmental cues, and (iv) movement of seed sources from warmer to cooler climates will increase risk to cold injury. During fall 2012, we visually assessed cold damage of bud, needle, and stem tissues following artificial freeze tests. Cool-temperature cues (e.g., degree hours below 2 °C) at the test sites were associated with cold hardening, which were minimal at the moderate test site owing to mild fall temperatures. Populations differed 3-fold in cold hardiness, with winter minimum temperatures and fall frost dates as strong seed-source climate predictors of cold hardiness, and with summer temperatures and aridity as secondary predictors. Seed-source movement resulted in only modest increases in cold damage. Our findings indicate that increased fall temperatures delay cold hardening, warmer/drier summers confer a degree of cold hardiness, and seed-source movement from warmer to cooler climates may be a viable option for adapting coniferous forest to future climate. Published 2015. This article is a U.S. Government work and is in the public domain in the USA.
Advanced gamma ray balloon experiment ground checkout and data analysis
NASA Technical Reports Server (NTRS)
Blackstone, M.
1976-01-01
A software programming package to be used in the ground checkout and handling of data from the advanced gamma ray balloon experiment is described. The Operator's Manual permits someone unfamiliar with the inner workings of the software system (called LEO) to operate on the experimental data as it comes from the Pulse Code Modulation interface, converting it to a form for later analysis, and monitoring the program of an experiment. A Programmer's Manual is included.
Hubble Space Telescope (HST) grappled by OV-103's RMS during STS-31 checkout
1990-04-25
The Hubble Space Telescope (HST), grappled by Discovery's, Orbiter Vehicle (OV) 103's, remote manipulator system (RMS), is held in a pre-deployment position. During STS-31 checkout procedures, the solar array (SA) panels and the high gain antennae (HGA) will be deployed. The starboard SA (center) and the two HGA are stowed along side the Support System Module (SSM) forward shell. The sun highlights HST against the blackness of space.
MARS PATHFINDER INSPECTED BY ENGINEER LINDA ROBECK IN SAEF-2
NASA Technical Reports Server (NTRS)
1996-01-01
In the SAEF-2 spacecraft checkout facility, engineer Linda Robeck of the Jet Propulsion Laboratory inspects the Mars Pathfinder lander. The spacecraft arrived at Kennedy Space Center from Pasadena, CA on Aug. 13, 1996. The petals of the lander will be opened for checkout of the spacecraft and the installation of the small rover. Launch of Mars Pathfinder aboard a McDonnell Douglas Delta II rocket will occur from Pad B at Complex 17 on Dec. 2.
2012-05-23
CAPE CANAVERAL, Fla. – Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, are accompanied by Lockheed Martin and NASA personnel during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann
2012-05-23
CAPE CANAVERAL, Fla. – Lockheed Martin and NASA personnel accompany Joanne Maguire, executive vice president of Space Systems for Lockheed Martin, and Kennedy Space Center Director Bob Cabana, far right, during a tour of Kennedy's Operations and Checkout Building. Lockheed Martin is the prime contractor to NASA for the Orion Multi-Purpose Crew Vehicle, which will be processed in the refurbished Operations and Checkout building. For more information, visit http://www.nasa.gov/exploration/systems/ground. Photo credit: NASA/Jim Grossmann
Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle
NASA Technical Reports Server (NTRS)
Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)
1998-01-01
The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.
12. COLD CALIBRATION BLOCKHOUSE BASEMENT VIEW FROM LEFT TO RIGHT, ...
12. COLD CALIBRATION BLOCKHOUSE BASEMENT VIEW FROM LEFT TO RIGHT, CABLE TRAYS, RACKS, CABLE CONNECTION TERMINALS. - Marshall Space Flight Center, East Test Area, Cold Calibration Test Stand, Huntsville, Madison County, AL
KSC facilities status and planned management operations. [for Shuttle launches
NASA Technical Reports Server (NTRS)
Gray, R. H.; Omalley, T. J.
1979-01-01
A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.
Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing and Analytical Modeling
NASA Technical Reports Server (NTRS)
Olsen, A. D.; Cady, E. C.; Jenkins, D. S.; Chandler, F. O.; Grayson, G. D.; Lopez, A.; Hastings, L. J.; Flachbart, R. H.; Pedersen, K. W.
2012-01-01
The demonstration of a unique liquid hydrogen (LH2) storage and feed system concept for solar thermal upper stage was cooperatively accomplished by a Boeing/NASA Marshall Space Flight Center team. The strategy was to balance thermodynamic venting with the engine thrusting timeline during a representative 30-day mission, thereby, assuring no vent losses. Using a 2 cubic m (71 cubic ft) LH2 tank, proof-of-concept testing consisted of an engineering checkout followed by a 30-day mission simulation. The data were used to anchor a combination of standard analyses and computational fluid dynamics (CFD) modeling. Dependence on orbital testing has been incrementally reduced as CFD codes, combined with standard modeling, continue to be challenged with test data such as this.
2018-04-09
Inside a laboratory in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida, Mark Nurge, Ph.D., at left, a physicist in the Applied Physics Lab with the center's Exploration Research and Technology Programs, and Bence Bartha, Ph.D., a specialist in non-destructive testing with URS Federal Services, are performing the first optical quality testing on a full window stack that is ready for installation in the docking hatch of NASA's Orion spacecraft. The data from the tests will help improve the requirements for manufacturing tolerances on Orion's windows and verify how the window should perform in space. Orion is being prepared for its first integrated uncrewed flight atop NASA's Space Launch System rocket on Exploration Mission-1.
40 CFR 86.1432 - Vehicle preparation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... cold temperature compliance pathway, the temperature of the fuel prior to its delivery to the fuel tank... is the Cold CO Test Procedure, performed in accordance with subpart C of this part. (ii) Testing by...). (C) Cold CO Test Procedure, in accordance with subpart C of this part. (c) Soak—(1) Manufacturer's...
40 CFR 86.1432 - Vehicle preparation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... cold temperature compliance pathway, the temperature of the fuel prior to its delivery to the fuel tank... is the Cold CO Test Procedure, performed in accordance with subpart C of this part. (ii) Testing by...). (C) Cold CO Test Procedure, in accordance with subpart C of this part. (c) Soak—(1) Manufacturer's...
Three-dimensional simulation of helix traveling-wave tube cold-test characteristics using MAFIA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kory, C.L.
1996-12-31
A critically important step in the traveling-wave tube (TWT) design process is the cold-testing of the slow-wave circuit for dispersion, beam interaction impedance and RF losses. Experimental cold-tests can be very time-consuming and expensive, thus limiting the freedom to examine numerous variations to the test circuit. This makes the need for computational methods crucial as they can lower cost, reduce tube development time and allow the freedom to introduce novel and improved designs. The cold-test parameters have been calculated for a C-Band Northrop-Grumman helix TWT slow-wave circuit using MAFIA, the three-dimensional electromagnetic finite-integration computer code. Measured and simulated cold-test datamore » for the Northrop-Grumman helix TWT including dispersion, impedance and attenuation will be presented. Close agreement between simulated and measured values of the dispersion, impedance and attenuation has been obtained.« less
STS-31 pre-deployment checkout of the Hubble Space Telescope (HST) on OV-103
1990-04-25
During STS-31 checkout, the Hubble Space Telescope (HST) is held in a pre-deployment position by Discovery's, Orbiter Vehicle (OV) 103's, remote manipulator system (RMS). The view, taken from the crew cabin overhead window W7, shows the starboard solar array (SA) panel (center) and two high gain antennae (HGA) (on either side) stowed along side the Support System Module (SSM) forward shell. The sun highlights HST against the blackness of space.
NASA Associate Administrator for Space Flight Rothenberg addresses guests at ribbon cutting for the
NASA Technical Reports Server (NTRS)
2000-01-01
NASA Associate Administrator for Space Flight Joseph Rothenberg addresses attendees at a ribbon cutting for the new Checkout and Launch Control System (CLCS) at the Hypergolic Maintenance Facility (HMF). The CLCS was declared operational in a ribbon cutting ceremony earlier. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing.
A guide to onboard checkout. Volume 7: RF communications
NASA Technical Reports Server (NTRS)
1971-01-01
The radio frequency communications subsystem for a space station is considered, with respect to onboard checkout requirements. The subsystem comprises all equipment necessary for transmitting and receiving, tracking and ranging, command, multiple voice and television information, and broadband experiment data. The communications subsystem provides a radio frequency interface between the space station and ground stations, either directly or indirectly, through a data relay satellite system, independent free-flying experiment modules, and logistics vehicles. Reliability, maintenance, and failure analyses are discussed, and computer programming techniques are presented.
2012-11-08
CAPE CANAVERAL, Fla. -- Inside the Applied Physics Laboratory in the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, lead researcher Dr. Bob Youngquist demonstrates a technology developed for the Space Shuttle Program to a group of Society of Physics students. About 800 graduate and undergraduate physics students toured Kennedy facilities. A group of about 40 students toured laboratories in the Operations and Checkout Building and the EDL during their visit. The physics students were in Orlando for the 2012 Quadrennial Physics Congress. Photo credit: NASA/Cory Huston
2012-11-08
CAPE CANAVERAL, Fla. -- Inside the Applied Physics Laboratory in the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, lead researcher Dr. Bob Youngquist describes technologies developed for the Space Shuttle Program to a group of Society of Physics students. About 800 graduate and undergraduate physics students toured Kennedy facilities. A group of about 40 students toured laboratories in the Operations and Checkout Building and the EDL during their visit. The physics students were in Orlando for the 2012 Quadrennial Physics Congress. Photo credit: NASA/Cory Huston
STS 41-G crew prepares to leave Operations and checkout bldg for launch
1984-10-05
41G-90081 / S17-90081 (5 Oct 1984) --- The seven member crew leaves the Operations and Checkout Building (OCB) to take a van ride to the launch pad. Leading the way is Kathryn D. Sullivan followed in file by Robert L. Crippen, Paul D. Scully-Power and Jon A. McBride. On the right side are Sally K. Ride, David C. Leestma and Marc Garneau. Trailing the crew are George W. S. Abbey, Richard Nygren, Paul Bulver, and Paul J. Weitz.
Benthic Acoustic Stress Sensor (BASS): Electronics Check-Out Procedures
Martini, Marinna A.; Williams, Albert
1993-01-01
Summary The procedures described here are presented so that a technician with limited experience with BASS can perform basic tests which, when executed properly, should be a thorough evaluation of the health of the system. This is not intended as an in depth explanation of how BASS works. Should any significant problems be found, it is suggested that you contact the manufacturer, Oceanographic Instrument Systems, North Falmouth, MA. The Tattletale controller is manufactured by the Onset Computer Corporation, Cataumet, MA.
2013-08-21
CAPE CANAVERAL, Fla. – A set of maneuvering thrusters is seen prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser
2013-08-21
CAPE CANAVERAL, Fla. – A technician works with a set of tanks prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser
2013-08-21
CAPE CANAVERAL, Fla. – Technicians work with a set of maneuvering thrusters prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser
The Launch Processing System for Space Shuttle.
NASA Technical Reports Server (NTRS)
Springer, D. A.
1973-01-01
In order to reduce costs and accelerate vehicle turnaround, a single automated system will be developed to support shuttle launch site operations, replacing a multiplicity of systems used in previous programs. The Launch Processing System will provide real-time control, data analysis, and information display for the checkout, servicing, launch, landing, and refurbishment of the launch vehicles, payloads, and all ground support systems. It will also provide real-time and historical data retrieval for management and sustaining engineering (test records and procedures, logistics, configuration control, scheduling, etc.).
Space Transportation Avionics Technology Symposium. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1990-01-01
The focus of the symposium was to examine existing and planned avionics technology processes and products and to recommend necessary changes for strengthening priorities and program emphases. Innovative changes in avionics technology development and design processes, identified during the symposium, are needed to support the increasingly complex, multi-vehicle, integrated, autonomous space-based systems. Key technology advances make such a major initiative viable at this time: digital processing capabilities, integrated on-board test/checkout methods, easily reconfigurable laboratories, and software design and production techniques.
Space Transportation Avionics Technology Symposium. Volume 2: Conference Proceedings
NASA Technical Reports Server (NTRS)
1990-01-01
The focus of the symposium was to examine existing and planned avionics technology processes and products and to recommend necessary changes for strengthening priorities and program emphases. Innovative changes in avionics technology development and design processes are needed to support the increasingly complex, multi-vehicle, integrated, autonomous space-based systems. Key technology advances make such a major initiative viable at this time: digital processing capabilities, integrated on-board test/checkout methods, easily reconfigurable laboratories, and software design and production techniques.
2009-05-18
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building's high bay, technicians are preparing to start testing how to put the "skins" on the outer mold of the simulator Orion crew module. Part of NASA's Constellation Program, the Orion spacecraft will return humans to the moon and prepare for future voyages to Mars and other destinations in our solar system. Orion is targeted to begin carrying humans to the International Space Station in 2015 and to the moon by 2020. Photo credit: NASA/Kim Shiflett
Operational manual for MX-290 data-voice PN Mod, MX-291 data-voice PN DEMOD
NASA Technical Reports Server (NTRS)
1971-01-01
This operation manual is also the final report of the program to design, assemble, checkout, and deliver to the customer three MX-290 transmitters and two MX-291 companion receivers. These equipments are designed and assembled to provide for maximum flexibility with respect to making changes in electrical circuits which may be required for future applications. A number of test points for monitoring and troubleshooting are provided along with easy access to subunits.
NASA Technical Reports Server (NTRS)
1979-01-01
Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.
2013-05-10
CAPE CANAVERAL, Fla. – Students from Merritt Island High School in Florida perform integration tests a cubesat called StangSat they will fly on a suborbital mission in the summer. The satellite will work inside a small rocket to measure vibration and other data during launch. NASA engineers are acting as mentors for the project and some of the space agency's labs at Kennedy Space Center, including this one inside the Operations and Checkout Building, are being used by the teams. Photo credit: NASA/Kim Shiflett
Micrometeorite Impact Test of Flex Solar Array Coupon
NASA Technical Reports Server (NTRS)
Wright, K. H.; Schneider, T. A.; Vaughn, J. A.; Hoang, B.; Wong, F.; Gardiner, G.
2016-01-01
Spacecraft with solar arrays operate throughout the near earth environment and are planned for outer planet missions. An often overlooked test condition for solar arrays that is applicable to these missions is micrometeoroid impacts and possibly electrostatic discharge (ESD) events resulting from these impacts. NASA Marshall Space Flight Center (MSFC) is partnering with Space Systems/Loral, LLC (SSL) to examine the results of simulated micrometeoroid impacts on the electrical performance of an advanced, lightweight flexible solar array design. The test is performed at MSFC's Micro Light Gas Gun Facility with SSL-provided coupons. Multiple impacts were induced at various locations on a powered test coupon under different string voltage (0V-150V) and string current (1.1A - 1.65A) conditions. The setup, checkout, and results from the impact testing are discussed.
Relationships of self-identified cold tolerance and cold-induced vasodilatation in the finger
NASA Astrophysics Data System (ADS)
Park, Joonhee; Lee, Joo-Young
2016-04-01
This study was conducted to investigate relationships of self-identified cold tolerance and cold-induced vasodilatation (CIVD) in the finger. Nine males and 34 females participated in the following 2 tests: a CIVD test and a self-reported survey. The CIVD test was conducted 30-min cold-water immersion (3.8 ± 0.3 °C) of the middle finger at an air temperature of 27.9 ± 0.1 °C. The self-reported questionnaire consisted of 28 questions about whole and local body cold and heat tolerances. By a cluster analysis on the survey results, the participants were divided into two groups: high self-identified cold tolerance (HSCT, n = 25) and low self-identified cold tolerance (LSCT, n = 18). LSCT had lower self-identified cold tolerance ( P < 0.001), preferred hot thermal stimulation ( P = 0.006), and wore heavier clothing during daily life ( P < 0.001) than HSCT. LSCT had significantly lower maximal finger temperatures ( T max) ( P = 0.040), smaller amplitude ( P = 0.029), and delayed onset time of CIVD ( P = 0.080) when compared to HSCT. Some questions examining the self-identified cold or heat tolerance had relationships with cold tolerance index, T max, and amplitude ( P < 0.1). These results indicate that self-identified cold tolerance classified through a standardized survey could be a good index to predict physiological cold tolerance.
Relationships of self-identified cold tolerance and cold-induced vasodilatation in the finger.
Park, Joonhee; Lee, Joo-Young
2016-04-01
This study was conducted to investigate relationships of self-identified cold tolerance and cold-induced vasodilatation (CIVD) in the finger. Nine males and 34 females participated in the following 2 tests: a CIVD test and a self-reported survey. The CIVD test was conducted 30-min cold-water immersion (3.8 ± 0.3 °C) of the middle finger at an air temperature of 27.9 ± 0.1 °C. The self-reported questionnaire consisted of 28 questions about whole and local body cold and heat tolerances. By a cluster analysis on the survey results, the participants were divided into two groups: high self-identified cold tolerance (HSCT, n = 25) and low self-identified cold tolerance (LSCT, n = 18). LSCT had lower self-identified cold tolerance (P < 0.001), preferred hot thermal stimulation (P = 0.006), and wore heavier clothing during daily life (P < 0.001) than HSCT. LSCT had significantly lower maximal finger temperatures (T max) (P = 0.040), smaller amplitude (P = 0.029), and delayed onset time of CIVD (P = 0.080) when compared to HSCT. Some questions examining the self-identified cold or heat tolerance had relationships with cold tolerance index, T max, and amplitude (P < 0.1). These results indicate that self-identified cold tolerance classified through a standardized survey could be a good index to predict physiological cold tolerance.
Automated Ground Umbilical Systems (AGUS) Project
NASA Technical Reports Server (NTRS)
Gosselin, Armand M.
2007-01-01
All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).
Dawn: An Ion-Propelled Journey to the Beginning of the Solar System
NASA Technical Reports Server (NTRS)
Brophy, John R.; Rayman, Marc D.; Pavri, Betina
2008-01-01
The Dawn mission is designed to perform a scientific investigation of the two heaviest mainbelt asteroids Vesta and Ceres. These bodies are believed to preserve records of the physical and chemical conditions present during the formation of the solar system. The mission uses an ion propulsion system to enable the single Dawn spacecraft and its complement of scientific instruments to orbit both of these asteroids. Dawn's three science instruments - the gamma ray and neutron detector, the visible and infrared mapping spectrometer, and the primary framing camera - were successfully tested after launch and are functioning normally. The ion propulsion system includes three ion thrusters of the type flown previously on NASA's Deep Space 1 mission. A minimum of two ion thrusters is necessary to accomplish the Dawn mission. Checkout of two of the ion thrusters was completed as planned within 30 days after launch. This activity confirmed that the spacecraft has two healthy ion thrusters. While further checkout activities are still in progress, the activities completed as of the end of October indicate that the spacecraft is well on its way toward being ready for the start of the thrusting-cruise phase of the mission beginning December 15th.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and EPA Cold-Weather Fuel Lines for permeation emissions? 1060.515 Section 1060.515 Protection of... Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines for permeation emissions? Measure emission as follows for EPA Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines: (a) Prior to permeation testing, use good...
Code of Federal Regulations, 2013 CFR
2013-07-01
... and EPA Cold-Weather Fuel Lines for permeation emissions? 1060.515 Section 1060.515 Protection of... Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines for permeation emissions? Measure emission as follows for EPA Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines: (a) Prior to permeation testing, use good...
Code of Federal Regulations, 2012 CFR
2012-07-01
... and EPA Cold-Weather Fuel Lines for permeation emissions? 1060.515 Section 1060.515 Protection of... Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines for permeation emissions? Measure emission as follows for EPA Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines: (a) Prior to permeation testing, use good...
Code of Federal Regulations, 2010 CFR
2010-07-01
... and EPA Cold-Weather Fuel Lines for permeation emissions? 1060.515 Section 1060.515 Protection of... Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines for permeation emissions? Measure emission as follows for EPA Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines: (a) Prior to permeation testing, use good...
Code of Federal Regulations, 2014 CFR
2014-07-01
... and EPA Cold-Weather Fuel Lines for permeation emissions? 1060.515 Section 1060.515 Protection of... Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines for permeation emissions? Measure emission as follows for EPA Nonroad Fuel Lines and EPA Cold-Weather Fuel Lines: (a) Prior to permeation testing, use good...
Baroreflex modulation of muscle sympathetic nerve activity during cold pressor test in humans
NASA Technical Reports Server (NTRS)
Cui, Jian; Wilson, Thad E.; Crandall, Craig G.
2002-01-01
The purpose of this project was to test the hypothesis that baroreceptor modulation of muscle sympathetic nerve activity (MSNA) and heart rate is altered during the cold pressor test. Ten subjects were exposed to a cold pressor test by immersing a hand in ice water for 3 min while arterial blood pressure, heart rate, and MSNA were recorded. During the second and third minute of the cold pressor test, blood pressure was lowered and then raised by intravenous bolus infusions of sodium nitroprusside and phenylephrine HCl, respectively. The slope of the relationship between MSNA and diastolic blood pressure was more negative (P < 0.005) during the cold pressor test (-244.9 +/- 26.3 units x beat(-1) x mmHg(-1)) when compared with control conditions (-138.8 +/- 18.6 units x beat(-1) x mmHg(-1)), whereas no significant change in the slope of the relationship between heart rate and systolic blood pressure was observed. These data suggest that baroreceptors remain capable of modulating MSNA and heart rate during a cold pressor test; however, the sensitivity of baroreflex modulation of MSNA is elevated without altering the sensitivity of baroreflex control of heart rate.
Spitzer Space Telescope in-orbit checkout and science verification operations
NASA Technical Reports Server (NTRS)
Linick, Sue H.; Miles, John W.; Gilbert, John B.; Boyles, Carol A.
2004-01-01
Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.
2013-07-26
CAPE CANAVERAL, Fla. – The Orion crew module for Exploration Flight Test 1 sits inside a clean room processing cell in the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann
2013-07-26
CAPE CANAVERAL, Fla. – The Orion crew module for Exploration Flight Test 1 sits inside a clean room processing cell in the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann
KSC - APOLLO-SOYUZ TEST PROJECT (ASTP) COMMAND SERVICE MODULE (CSM) - KSC
1974-09-08
S74-32049 (8 Sept. 1974) --- The Apollo Command Module for the Apollo-Soyuz Test Project mission goes through receiving, inspection and checkout procedures in the Manned Spacecraft Operations Building at the Kennedy Space Center. The spacecraft had just arrived by air from the Rockwell International plant at Downey, California. The Apollo spacecraft (Command Module, Service Module and Docking Module), with astronauts Thomas P. Stafford, Vance D. Brand and Donald K. Slayton aboard, will dock in Earth orbit with a Soviet Soyuz spacecraft during the joint U.S.-USSR ASTP flight scheduled for July 1975. The Soviet and American crews will visit one another?s spacecraft.
NASA Technical Reports Server (NTRS)
Velden, Christopher
1994-01-01
Significant progress was attained in this reporting period towards the overall goal of improving the CIMSS satellite wind algorithms through incorporation of new processing options, and testing/evaluating these options on data sets and through case studies. Several new strategies were implemented, and these are outlined. In addition, data from GOES-8 have recently become available during system check-out and evaluation. Initial testing and software adjustments necessary to handle this new and improved data are briefly touched upon in this summary, and will be a main focus of the remaining funds and efforts under this contract.
A Rare Non-Hemolytic Case of Idiopathic Cold Agglutinin Disease.
Erkus, Edip; Kocak, Mehmet Z; Aktas, Gulali; Ozen, Mehmet; Atak, Burcin M; Duman, Tuba T; Tekce, Buket K; Savli, Haluk
2018-06-01
Cold agglutinin disease is a very rare condition associated with agglutination of erythrocytes in cold environment usually due to IgM type antibodies. Other than hemolytic anemias, it may interfere with routine hemogram tests due to miscalculation of red blood cell count (RBC) and other hemogram parameters calculated with involvement of RBC. Awareness of the condition is important to overcome laboratory errors. We studied a peripheral blood smear and repeated the hemogram test at 37°C to establish the diagnosis of cold agglutinin disease. Initial hemogram test results of the fifty-eight year-old man was as follows: RBC: 1.34 M/µL, hemoglobin (Hb): 12.4 g/dL, hematocrit (Htc): 11.8%, mean corpuscular hemoglobin (MCH): 92.4 pg, and mean corpuscular hemoglobin concentration (MCHC): 105 gr/dL. Despite the standard indirect Coombs test being negative, repeated tests at room temperature was 4+. We suspected cold agglutinin disease and repeated the hemogram test using the Bain-Marie method at 37°C and the test results showed RBC: 3.4 M/µL, hemoglobin: 12.6 g/dL, hematocrit: 30.2%, MCH: 31.7 pg, and MCHC: 41.8 g/dL. Inappropriate hemogram results may be a sign of underlying cold agglutinin disease. Hemolytic anemia not always accompanies the disease; however, cold exposure may trigger erythrocyte agglutination in vitro and may cause erratic laboratory results.
Cold Regions Test of Indirect Fire Weapons Ammunition
1983-03-08
COLD REGIONS TEST OF INDIRECT FIRE WEAPONS AMMUNITION Paragraph 1 . SCOPE. 1 2. FACILITIES AND INSTRUMENTATION .......... 3. PREPARATION FOR TEST...A- 1 B. Data Collection Sheets ..... .............. B- 1 C. References ..... .................... ... C- 1 D. Cold-Dry...Uniform .D...... .. ... .. ... 0- 1 1 . SCOPE. The procedures outlined in this TOP are designed to determine the c-h-arac-teristics of indirect artillery
Wire and Cable Cold Bending Test
NASA Technical Reports Server (NTRS)
Colozza, Anthony
2010-01-01
One of the factors in assessing the applicability of wire or cable on the lunar surface is its flexibility under extreme cold conditions. Existing wire specifications did not address their mechanical behavior under cold, cryogenic temperature conditions. Therefore tests were performed to provide this information. To assess this characteristic 35 different insulated wire and cable pieces were cold soaked in liquid nitrogen. The segments were then subjected to bending and the force was recorded. Any failure of the insulation or jacketing was also documented for each sample tested. The bending force tests were performed at room temperature to provide a comparison to the change in force needed to bend the samples due to the low temperature conditions. The results from the bending tests were plotted and showed how various types of insulated wire and cable responded to bending under cold conditions. These results were then used to estimate the torque needed to unroll the wire under these low temperature conditions.
Affordable Electro-Magnetic Interference (EMI) Testing on Large Space Vehicles
NASA Technical Reports Server (NTRS)
Aldridge, Edward; Curry, Bruce; Scully, Robert
2015-01-01
Objective: Perform System-Level EMI testing of the Orion Exploration Flight Test-1 (EFT-1) spacecraft in situ in the Kennedy Space Center's Neil Armstrong Operations & Checkout (O&C) Facility in 6 days. The only way to execute the system-level EMI testing and meet this schedule challenge was to perform the EMI testing in situ in the Final Assembly & System Test (FAST) Cell in a reverberant mode, not the direct illumination mode originally planned. This required the unplanned construction of a Faraday Cage around the vehicle and FAST Cell structure. The presence of massive steel platforms created many challenges to developing an efficient screen room to contain the RF energy and yield an effective reverberant chamber. An initial effectiveness test showed marginal performance, but improvements implemented afterward resulted in the final test performing surprisingly well! The paper will explain the design, the challenges, and the changes that made the difference in performance!
Ares I Scale Model Acoustic Tests Instrumentation for Acoustic and Pressure Measurements
NASA Technical Reports Server (NTRS)
Vargas, Magda B.; Counter, Douglas D.
2011-01-01
The Ares I Scale Model Acoustic Test (ASMAT) was a development test performed at the Marshall Space Flight Center (MSFC) East Test Area (ETA) Test Stand 116. The test article included a 5% scale Ares I vehicle model and tower mounted on the Mobile Launcher. Acoustic and pressure data were measured by approximately 200 instruments located throughout the test article. There were four primary ASMAT instrument suites: ignition overpressure (IOP), lift-off acoustics (LOA), ground acoustics (GA), and spatial correlation (SC). Each instrumentation suite incorporated different sensor models which were selected based upon measurement requirements. These requirements included the type of measurement, exposure to the environment, instrumentation check-outs and data acquisition. The sensors were attached to the test article using different mounts and brackets dependent upon the location of the sensor. This presentation addresses the observed effect of the sensors and mounts on the acoustic and pressure measurements.
``High energy Electron exPeriment (HEP)'' onboard the ERG satellite
NASA Astrophysics Data System (ADS)
Mitani, T.; Takashima, T.; Kasahara, S.; Miyake, W.; Hirahara, M.
2017-12-01
The Exploration of energization and Radiation in Geospace (ERG) satellite was successfully launched on December 20, 2016, and now explores how relativistic electrons in the radiation belts are generated during space storms. "High energy Electron exPeriment (HEP)" onboard the ERG satellite observes 70 keV - 2 MeV electrons and provides three-dimensional velocity distribution of electrons every spacecraft spin period. Electrons are observed by two types of camera designs, HEP-L and HEP-H, with regard to geometrical factor and energy range. HEP-L observes 0.1 - 1 MeV electrons and its geometrical factor (G-factor) is 10-3 cm2 str, and HEP-H observes 0.7 - 2 MeV and G-factor is 10-2 cm2 str. HEP-L and HEP-H each consist of three pin-hole type cameras, and each camera consist of mechanical collimator, stacked silicon semiconductor detectors and readout ASICs. HEP-H has larger opening angle of the collimator and more silicon detectors to observe higher energy electrons than HEP-L. The initial checkout in orbit was carried out in February 2017 and it was confirmed that there was no performance degradation by comparing the results of the initial checkout in orbit and the prelaunch function tests. Since late March, HEP has carried out normal observation. HEP observed losses and recovery of the outer radiation belt electrons several times up to now. In this presentation we introduce the HEP instrument design, prelaunch tests results and report the initial results in orbit.
2003-06-26
VANDENBERG AIR FORCE BASE, CALIF. - Outside the clean room at Vandenberg Air Force Base, Calif., the SciSat-1 spacecraft (background) has been removed from the shipping container mounting base (lower left) and placed on the handling fixture. Sci-Sat, which will undergo instrument checkout and spacecraft functional testing, weighs approximately 330 pounds and after launch will be placed in a 400-mile-high polar orbit to investigate processes that control the distribution of ozone in the upper atmosphere. The data from the satellite will provide Canadian and international scientists with improved measurements relating to global ozone processes and help policymakers assess existing environmental policy and develop protective measures for improving the health of our atmosphere, preventing further ozone depletion. The mission is designed to last two years.
Accurate Cold-Test Model of Helical TWT Slow-Wave Circuits
NASA Technical Reports Server (NTRS)
Kory, Carol L.; Dayton, James A., Jr.
1997-01-01
Recently, a method has been established to accurately calculate cold-test data for helical slow-wave structures using the three-dimensional electromagnetic computer code, MAFIA. Cold-test parameters have been calculated for several helical traveling-wave tube (TWT) slow-wave circuits possessing various support rod configurations, and results are presented here showing excellent agreement with experiment. The helical models include tape thickness, dielectric support shapes and material properties consistent with the actual circuits. The cold-test data from this helical model can be used as input into large-signal helical TWT interaction codes making it possible, for the first time, to design a complete TWT via computer simulation.
2012-11-01
CAPE CANAVERAL, Fla. – The Orion Exploration Flight Test 1 crew module is undergoing proof pressure testing at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The test incrementally pressurizes the spacecraft with breathing air and is designed to demonstrate weld strength capability and structural performance at maximum flight operating pressures. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Ben Smegelsky
2012-11-01
CAPE CANAVERAL, Fla. – The Orion Exploration Flight Test 1 crew module is undergoing proof pressure testing at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The test incrementally pressurizes the spacecraft with breathing air and is designed to demonstrate weld strength capability and structural performance at maximum flight operating pressures. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Ben Smegelsky
2012-11-01
CAPE CANAVERAL, Fla. – The Orion Exploration Flight Test 1 crew module is undergoing proof pressure testing at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The test incrementally pressurizes the spacecraft with breathing air and is designed to demonstrate weld strength capability and structural performance at maximum flight operating pressures. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Ben Smegelsky
NASA Technical Reports Server (NTRS)
Bentley, Nicole L.; Thomas, Evan A.; VanWie, Michael; Morrison, Chad; Stinson, Richard G.
2010-01-01
The Total Organic Carbon Analyzer (TOGA) is designed to autonomously determine recovered water quality as a function of TOC. The current TOGA has been on the International Space Station since November 2008. Functional checkout and operations revealed complex operating considerations. Specifically, failure of the hydrogen catalyst resulted in the development of an innovative oxidation analysis method. This method reduces the activation time and limits the hydrogen produced during analysis, while retaining the ability to indicate TOC concentrations within 25% accuracy. Subsequent testing and comparison to archived samples returned from the Station and tested on the ground yield high confidence in this method, and in the quality of the recovered water.
Cold Regions Environmental Protection and Durability Test of Clothing.
1983-07-08
17 AD-A130 482 COLD REGIONS ENVIRONMENTAL PROTECTION AND DURABILITY 1 / TEST OF CLDTHING(U) *ARMY TEST AND EVALGATION COMMAND ABERDEEN PROVING GROUND...MD 08 JUL 83 TOP-10-2510 UNCLASSIFIED FDA 6/7 -Lm U= 1,2 2 340 12.0IIHI . 1 L1.8 j$jfLi25 .411 .6 MICROCOPY RESOLUTION TEST CHART NT’NL BUREAU C’ N j...July 1983 AD NO. COLD REGIONS ENVIRONMENTAL PROTECTION AND DURABILITY TEST OF CLOTHING Page 1 SCOPE .................................. 1 2 FACILITIES
Resource Prospector Propulsion Cold Flow Test
NASA Technical Reports Server (NTRS)
Williams, Hunter; Pederson, Kevin; Dervan, Melanie; Holt, Kimberly; Jernigan, Frankie; Trinh, Huu; Flores, Sam
2014-01-01
For the past year, NASA Marshall Space Flight Center and Johnson Space Center have been working on a government version of a lunar lander design for the Resource Prospector Mission. A propulsion cold flow test system, representing an early flight design of the propulsion system, has been fabricated. The primary objective of the cold flow test is to simulate the Resource Prospector propulsion system operation through water flow testing and obtain data for anchoring analytical models. This effort will also provide an opportunity to develop a propulsion system mockup to examine hardware integration to a flight structure. This paper will report the work progress of the propulsion cold flow test system development and test preparation. At the time this paper is written, the initial waterhammer testing is underway. The initial assessment of the test data suggests that the results are as expected and have a similar trend with the pretest prediction. The test results will be reported in a future conference.
On-Orbit Checkout and Activation of the ISS Oxygen Generation System
NASA Technical Reports Server (NTRS)
Bagdigian, Robert M.; Prokhorov, Kimberlee S.
2007-01-01
NASA has developed and; deployed an Oxygen Generation System (OGS) into the Destiny Module of the International Space Station (ISS). The major. assembly; included in this system is the Oxygen Generator Assembly. (OGA) which was developed under NASA contract by Hamilton Sundstrand Space Systems International (HSSSI), Inc. This paper summarizes the installation of the system into the Destiny Module, its initial checkout and periodic preventative maintenance activities, and its operational activation. Trade studies and analyses that were conducted with the goal of mitigating on-orbit operational risks are also discussed.
2015-05-22
long substitute, Pilot Check-Out ( PCO ), which re-taught the basics of air refueling and assault-zone landings as a "top off’ course. While some cost...saving occurred the failure rates and poor performance ofnew students at PIQ and PCO forced changes in the program. 132 Reoccurring failures reduced...AFB, TX: HQ AETC/A3ZM, February 2013. ---.Air Education and Training Command Syllabus C-17 Pilot Checkout ( PCO ). Randolph AFB, TX: HQ AETC/A3ZM
2012-11-08
CAPE CANAVERAL, Fla. -- Inside a laboratory in the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, research chemist Mary Coan describes components of the Regolith and Environment Science and Oxygen and Lunar Volatiles Extraction, or RESOLVE, rover to a group of Society of Physics students. About 800 graduate and undergraduate physics students toured Kennedy facilities. A group of about 40 students toured laboratories in the Operations and Checkout Building and the EDL during their visit. The physics students were in Orlando for the 2012 Quadrennial Physics Congress. Photo credit: NASA/Cory Huston
Applications Technology Satellite ATS-6 in orbit checkout report
NASA Technical Reports Server (NTRS)
Moore, W.; Prensky, W. (Editor)
1974-01-01
The activities of the ATS-6 spacecraft for the checkout period of approximately four weeks beginning May 30, 1974 are described, along with the results of a performance evaluation of its subsystems and components. The following specific items are discussed: (1) subsystem requirements/specifications and in-orbit performance summary; (2) flight chronology; (3) spacecraft description; (4) structural/deployment subsystems; (5) electrical power subsystem; (6) thermal control subsystem; (7) telemetry and command subsystems; (8) attitude control subsystem; (9) spacecraft propulsion subsystem; (10) communication subsystem; and (12) experiment subsystem.
Delorme, N; Drouet, M; Thibaudeau, A; Verret, J L
2002-09-01
Cold urticaria is characterized by the development of urticaria, usually superficial and/or angioedematous reaction after cold contact. It was found predominantly in young women. The diagnosis is based on the history and ice cube test. Patients with a negative ice cube test may have represented systemic cold urticaria (atypical acquired cold urticaria) induced by general body cooling. The pathogenesis is poorly understood. Cold urticaria can be classified into acquired and familial disorders, with an autosomal dominant inheritance. Idiopathic cold urticaria is most common type but the research of a cryopathy is necessary. Therapy is often difficult. It is essential that the patient be warned of the dangers of swimming in cold water because systemic hypotension can occur. H1 antihistamines can be used for treatment of cold urticaria but the clinical responses are highly variable. The combination with an H2 antagonists is more effective. Doxepin may be useful in the treatment. Leukotriene receptor antagonists may be a novel, promising drug entity. In patients who do not respond to previous treatments, induction of cold tolerance may be tried.
Shuttle avionics software development trials: Tribulations and successes, the backup flight system
NASA Technical Reports Server (NTRS)
Chevers, E. S.
1985-01-01
The development and verification of the Backup Flight System software (BFS) is discussed. The approach taken for the BFS was to develop a very simple and straightforward software program and then test it in every conceivable manner. The result was a program that contained approximately 12,000 full words including ground checkout and the built in test program for the computer. To perform verification, a series of tests was defined using the actual flight type hardware and simulated flight conditions. Then simulated flights were flown and detailed performance analysis was conducted. The intent of most BFS tests was to demonstrate that a stable flightpath could be obtained after engagement from an anomalous initial condition. The extention of the BFS to meet the requirements of the orbital flight test phase is also described.
1999-02-24
KENNEDY SPACE CENTER, FLA. -- Workers watch as the 27.5-ton lid is lowered onto the top of an altitude chamber in the Operations and Checkout Building high bay. The chamber was recently reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test
1999-02-24
KENNEDY SPACE CENTER, FLA. -- An overhead crane lifts the saucer-like 27.5-ton lid of an altitude chamber in the Operations and Checkout Building high bay. The chamber was recently reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test
Assembly and Thermal Hydraulic Test of a Stainless Steel Sodium-Potassium Circuit
NASA Technical Reports Server (NTRS)
Garber, A.; Godfroy, T.; Webster, K.
2007-01-01
Early Flight Fission Test Facilities (EFF-TF) team has been tasked by the NASA Marshall Space Flight Center Nuclear Systems Office to design, fabricate, and test an actively pumped alkali metal flow circuit. The system was originally built for use with lithium, but due to a shift in focus, it was redesigned for use with a eutectic mixture of sodium potassium (NaK). Basic circuit components include: reactor segment, NaK to gas heat exchanger, electromagnetic (EM) liquid metal pump, load/drain reservoir, expansion reservoir, instrumentation, and a spill reservoir. A 37-pin partial-array core (pin and flow path dimensions are the same as those in a full design) was selected for fabrication and test. This paper summarizes the first fill and checkout testing of the Stainless Steel NaK-Cooled Circuit (SNaKC).
Hypothermic general cold adaptation induced by local cold acclimation.
Savourey, G; Barnavol, B; Caravel, J P; Feuerstein, C; Bittel, J H
1996-01-01
To study relationships between local cold adaptation of the lower limbs and general cold adaptation, eight subjects were submitted both to a cold foot test (CFT, 5 degrees C water immersion, 5 min) and to a whole-body standard cold air test (SCAT, 1 degree C, 2 h, nude at rest) before and after a local cold acclimation (LCA) of the lower limbs effected by repeated cold water immersions. The LCA induced a local cold adaptation confirmed by higher skin temperatures of the lower limbs during CFT and a hypothermic insulative general cold adaptation (decreased rectal temperature and mean skin temperature P < 0.05) without a change either in metabolic heat production or in lower limb skin temperatures during SCAT after LCA. It was concluded that local cold adaptation was related to the habituation process confirmed by decreased plasma concentrations of noradrenaline (NA) during LCA (P < 0.05). However, the hypothermic insulative general cold adaptation was unrelated either to local cold adaptation or to the habituation process, because an increased NA during SCAT after LCA (P < 0.05) was observed but was rather related to a "T3 polar syndrome" occurring during LCA.
Development of Hot and Cold Executive Function in Boys and Girls With ADHD.
Skogli, Erik Winther; Andersen, Per Normann; Hovik, Kjell Tore; Øie, Merete
2017-02-01
To investigate the development of executive function with pronounced emotional salience (hot EF) and less pronounced emotional salience (cold EF) in boys and girls with ADHD relative to typically developing (TD) children. Seventy-five children with ADHD and 47 TD children were assessed with hot and cold EF tests at baseline and after 2 years. Despite considerable maturation, the ADHD group remained impaired on all cold EF tests relative to TD children after 2 years. There was no effect of gender on cold EF test results. Females with ADHD outperformed TD counterparts on hot EF at baseline. Females with ADHD showed deteriorating hot EF performance, while TD counterparts showed improved hot EF performance across time. Enduring cold EF impairments after 2 years may reflect stable phenotypic traits in children with ADHD. Results indicate divergent developmental trajectories of hot EF in girls with ADHD relative to TD counterparts.
Cold-end Subsystem Testing for the Fission Power System Technology Demonstration Unit
NASA Technical Reports Server (NTRS)
Briggs, Maxwell; Gibson, Marc; Ellis, David; Sanzi, James
2013-01-01
The Fission Power System (FPS) Technology Demonstration Unit (TDU) consists of a pumped sodium-potassium (NaK) loop that provides heat to a Stirling Power Conversion Unit (PCU), which converts some of that heat into electricity and rejects the waste heat to a pumped water loop. Each of the TDU subsystems is being tested independently prior to full system testing at the NASA Glenn Research Center. The pumped NaK loop is being tested at NASA Marshall Space Flight Center; the Stirling PCU and electrical controller are being tested by Sunpower Inc.; and the pumped water loop is being tested at Glenn. This paper describes cold-end subsystem setup and testing at Glenn. The TDU cold end has been assembled in Vacuum Facility 6 (VF 6) at Glenn, the same chamber that will be used for TDU testing. Cold-end testing in VF 6 will demonstrate functionality; validated cold-end fill, drain, and emergency backup systems; and generated pump performance and system pressure drop data used to validate models. In addition, a low-cost proof-of concept radiator has been built and tested at Glenn, validating the design and demonstrating the feasibility of using low-cost metal radiators as an alternative to high-cost composite radiators in an end-to-end TDU test.
Thornton, Lukar E; Cameron, Adrian J; McNaughton, Sarah A; Worsley, Anthony; Crawford, David A
2012-03-15
Supermarkets play a major role in influencing the food purchasing behaviours of most households. Snack food exposures within these stores may contribute to higher levels of consumption and ultimately to increasing levels of obesity, particularly within socioeconomically disadvantaged neighbourhoods. We aimed to examine the availability of snack food displays at checkouts, end-of-aisle displays and island displays in major supermarket chains in the least and most socioeconomically disadvantaged neighbourhoods of Melbourne. Within-store audits of 35 Melbourne supermarkets. Supermarkets were sampled from the least and most socioeconomically disadvantaged suburbs within 30 km of the Melbourne CBD. We measured the availability of crisps, chocolate, confectionery, and soft drinks (diet and regular) at the checkouts, in end-of-aisle displays, and in island bin displays. Snack food displays were most prominent at checkouts with only five stores not having snack foods at 100% of their checkouts. Snack foods were also present at a number of end-of-aisle displays (at both the front (median 38%) and back (median 33%) of store), and in island bin displays (median number of island displays: 7; median total circumference of island displays: 19.4 metres). Chocolate items were the most common snack food item on display. There was no difference in the availability of these snack food displays by neighbourhood disadvantage. As a result of the high availability of snack food displays, exposure to snack foods is almost unavoidable in Melbourne supermarkets, regardless of levels of neighbourhood socioeconomic disadvantage. Results of this study could promote awareness of the prominence of unhealthy food items in chain-brand supermarkets outlets.
Development and Analysis of Cold Trap for Use in Fission Surface Power-Primary Test Circuit
NASA Technical Reports Server (NTRS)
Wolfe, T. M.; Dervan, C. A.; Pearson, J. B.; Godfroy, T. J.
2012-01-01
The design and analysis of a cold trap proposed for use in the purification of circulated eutectic sodium potassium (NaK-78) loops is presented. The cold trap is designed to be incorporated into the Fission Surface Power-Primary Test Circuit (FSP-PTC), which incorporates a pumped NaK loop to simulate in-space nuclear reactor-based technology using non-nuclear test methodology as developed by the Early Flight Fission-Test Facility. The FSP-PTC provides a test circuit for the development of fission surface power technology. This system operates at temperatures that would be similar to those found in a reactor (500-800 K). By dropping the operating temperature of a specified percentage of NaK flow through a bypass containing a forced circulation cold trap, the NaK purity level can be increased by precipitating oxides from the NaK and capturing them within the cold trap. This would prevent recirculation of these oxides back through the system, which may help prevent corrosion.
Observations of low-energy ions with Arase/LEPi
NASA Astrophysics Data System (ADS)
Yoshizumi, M.; Asamura, K.; Kazama, Y.; Yokota, S.; Kasahara, S.
2017-12-01
LEPi is one of the instruments onboard Arase, which is an energy-mass spectrometer designed to measure ions with energies from 0.01keV/q up to 25keV/q. In order to discriminate species of incoming ions, LEPi uses a TOF (Time-Of-Flight) technique. TOF also works as a noise rejector, which is useful for rejection of background noise due to high energy particles in the inner magnetosphere. LEPi has passed the initial checkout phase after launch, and now under regular observations. Since the regular observation started (end of March, 2017), Arase encountered several magnetic storms driven by CIR and CMEs. LEPi observed sudden flux enhancement and subsequent gradual decay of low-energy ( 10eV/q) ions around L=4 associated with the magnetic storms. In some cases, these flux modulations coinside with eclipse (absent of Sun light on the spacecraft), but others do not. Spacecraft potential decreases when the spacecraft gets eclipse. Therefore, a part of ions whose enegies are lower than energy range of LEPi are accelerated and appeared in the range. These fluxes might reflect transportation / energization of cold component in the inner magnetosphere. We will present current LEPi operations and initial scientific results.
Predictive values of thermal and electrical dental pulp tests: a clinical study.
Villa-Chávez, Carlos E; Patiño-Marín, Nuria; Loyola-Rodríguez, Juan P; Zavala-Alonso, Norma V; Martínez-Castañón, Gabriel A; Medina-Solís, Carlo E
2013-08-01
For a diagnostic test to be useful, it is necessary to determine the probability that the test will provide the correct diagnosis. Therefore, it is necessary to calculate the predictive value of diagnostics. The aim of the present study was to identify the sensitivity, specificity, positive and negative predictive values, accuracy, and reproducibility of thermal and electrical tests of pulp sensitivity. The thermal tests studied were the 1, 1, 1, 2-tetrafluoroethane (cold) and hot gutta-percha (hot) tests. For the electrical test, the Analytic Technology Pulp Tester (Analytic Technology, Redmond, WA) was used. A total of 110 teeth were tested: 60 teeth with vital pulp and 50 teeth with necrotic pulps (disease prevalence of 45%). The ideal standard was established by direct pulp inspection. The sensitivities of the diagnostic tests were 0.88 for the cold test, 0.86 for the heat test, and 0.76 for the electrical test, and the specificity was 1.0 for all 3 tests. The negative predictive value was 0.90 for the cold test, 0.89 for the heat test, and 0.83 for the electrical test, and the positive predictive value was 1.0 for all 3 tests. The highest accuracy (0.94) and reproducibility (0.88) were observed for the cold test. The cold test was the most accurate method for diagnostic testing. Copyright © 2013 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.
Ground Operations Aerospace Language (GOAL). Volume 3: Data bank
NASA Technical Reports Server (NTRS)
1973-01-01
The GOAL (Ground Operations Aerospace Language) test programming language was developed for use in ground checkout operations in a space vehicle launch environment. To insure compatibility with a maximum number of applications, a systematic and error-free method of referencing command/response (analog and digital) hardware measurements is a principle feature of the language. Central to the concept of requiring the test language to be independent of launch complex equipment and terminology is that of addressing measurements via symbolic names that have meaning directly in the hardware units being tested. To form the link from test program through test system interfaces to the units being tested the concept of a data bank has been introduced. The data bank is actually a large cross-reference table that provides pertinent hardware data such as interface unit addresses, data bus routings, or any other system values required to locate and access measurements.
Traveling-Wave Tube Cold-Test Circuit Optimization Using CST MICROWAVE STUDIO
NASA Technical Reports Server (NTRS)
Chevalier, Christine T.; Kory, Carol L.; Wilson, Jeffrey D.; Wintucky, Edwin G.; Dayton, James A., Jr.
2003-01-01
The internal optimizer of CST MICROWAVE STUDIO (MWS) was used along with an application-specific Visual Basic for Applications (VBA) script to develop a method to optimize traveling-wave tube (TWT) cold-test circuit performance. The optimization procedure allows simultaneous optimization of circuit specifications including on-axis interaction impedance, bandwidth or geometric limitations. The application of Microwave Studio to TWT cold-test circuit optimization is described.
40 CFR 600.107-08 - Fuel specifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Exhaust Emission Test Procedures § 600.107-08 Fuel specifications. (a) The test fuel specifications for... given in paragraph (b) of this section. (b)(1) Diesel test fuel used for cold temperature FTP testing... alternative fuel for cold temperature FTP testing. (c) Test fuels representing fuel types for which there are...
40 CFR 600.107-08 - Fuel specifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Exhaust Emission Test Procedures § 600.107-08 Fuel specifications. (a) The test fuel specifications for... given in paragraph (b) of this section. (b)(1) Diesel test fuel used for cold temperature FTP testing... alternative fuel for cold temperature FTP testing. (c) Test fuels representing fuel types for which there are...
40 CFR 600.107-08 - Fuel specifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Exhaust Emission Test Procedures § 600.107-08 Fuel specifications. (a) The test fuel specifications for... given in paragraph (b) of this section. (b)(1) Diesel test fuel used for cold temperature FTP testing... alternative fuel for cold temperature FTP testing. (c) Test fuels representing fuel types for which there are...
KSC supplied views of the STS 28 crew suiting up, at breakfast and
1989-08-09
S89-41091 (18 July 1989) --- During the Terminal Countdown Demonstration Test (TCDT), STS-28 crew members are assisted with suiting up in the Operations and Checkout Building prior to departing for pad 39-B. STS-28 and the Space Shuttle Columbia are scheduled to be launched in early August on a Department of Defense dedicated mission. The crew for STS-28 are Commander Brewster H. Shaw; Pilot Richard N. Richards; and Mission Specialists Mark N. Brown, James C. Adamson, and David C. Leestma.
Skylab thruster attitude control system
NASA Technical Reports Server (NTRS)
Wilmer, G. E., Jr.
1974-01-01
Preflight activities and the Skylab mission support effort for the thruster attitude control system (TACS) are documented. The preflight activities include a description of problems and their solutions encountered in the development, qualification, and flight checkout test programs. Mission support effort is presented as it relates to system performance assessment, real-time problem solving, flight anomalies, and the daily system evaluation. Finally, the detailed flight evaluation is presented for each phase of the mission using system telemetry data. Data assert that the TACS met or exceeded design requirements and fulfilled its assigned mission objectives.
2004-03-22
KENNEDY SPACE CENTER, FLA. -- At the Astrotech Space Operations processing facilities, workers secure NASA’s MESSENGER spacecraft on a test stand. Once in place, employees of the Johns Hopkins University Applied Physics Laboratory, builders of the spacecraft, will begin final processing for launch, including checkout of the power systems, communications systems and control systems. The thermal blankets will also be attached for flight. MESSENGER - short for MErcury Surface, Space ENvironment, GEochemistry and Ranging - will be launched aboard a Boeing Delta II rocket no earlier than July 30 on a six-year mission to study the planet Mercury.
2004-03-22
KENNEDY SPACE CENTER, FLA. -- At the Astrotech Space Operations processing facilities, workers secure NASA’s MESSENGER spacecraft on a test stand. Once in place, employees of the Johns Hopkins University Applied Physics Laboratory, builders of the spacecraft, will begin final processing for launch, including checkout of the power systems, communications systems and control systems. The thermal blankets will also be attached for flight. MESSENGER - short for MErcury Surface, Space ENvironment, GEochemistry and Ranging - will be launched aboard a Boeing Delta II rocket no earlier than July 30 on a six-year mission to study the planet Mercury.
2004-03-22
KENNEDY SPACE CENTER, FLA. -- At the Astrotech Space Operations processing facilities, workers secure NASA’s MESSENGER spacecraft on a test stand. Once in place, employees of the Johns Hopkins University Applied Physics Laboratory, builders of the spacecraft, will begin final processing for launch, including checkout of the power systems, communications systems and control systems. The thermal blankets will also be attached for flight. MESSENGER - short for MErcury Surface, Space ENvironment, GEochemistry and Ranging - will be launched aboard a Boeing Delta II rocket no earlier than July 30 on a six-year mission to study the planet Mercury.
NASA Technical Reports Server (NTRS)
Gerrish, Harold P., Jr.
2003-01-01
This paper presents viewgraphs on Solar Thermal Propulsion (STP). Some of the topics include: 1) Ways to use Solar Energy for Propulsion; 2) Solar (fusion) Energy; 3) Operation in Orbit; 4) Propulsion Concepts; 5) Critical Equations; 6) Power Efficiency; 7) Major STP Projects; 8) Types of STP Engines; 9) Solar Thermal Propulsion Direct Gain Assembly; 10) Specific Impulse; 11) Thrust; 12) Temperature Distribution; 13) Pressure Loss; 14) Transient Startup; 15) Axial Heat Input; 16) Direct Gain Engine Design; 17) Direct Gain Engine Fabrication; 18) Solar Thermal Propulsion Direct Gain Components; 19) Solar Thermal Test Facility; and 20) Checkout Results.
Pattern classification using charge transfer devices
NASA Technical Reports Server (NTRS)
1980-01-01
The feasibility of using charge transfer devices in the classification of multispectral imagery was investigated by evaluating particular devices to determine their suitability in matrix multiplication subsystem of a pattern classifier and by designing a protype of such a system. Particular attention was given to analog-analog correlator devices which consist of two tapped delay lines, chip multipliers, and a summed output. The design for the classifier and a printed circuit layout for the analog boards were completed and the boards were fabricated. A test j:g for the board was built and checkout was begun.
Traynor, Robyn; MacDermid, Joy C
2008-09-01
Intolerance to the cold is common following peripheral nerve injury and surgery of the upper extremity. Despite its prevalence, the exact pathophysiology and natural history of this condition are not well understood. Subjective, self-report questionnaires have been created and validated as reliable measures of post-traumatic cold intolerance. The difficulty currently lies in assigning an objective measure to this predominantly subjective phenomenon. The present study evaluated the test-retest reliability of a proposed objective measure of cold intolerance, the Immersion in Cold-water Evaluation (ICE), and its correlation with subjective measures in healthy control subjects. Two age groups were also compared to investigate the effect of age on cold intolerance and temperature recovery. On two separate testing days, subjects completed three health-related questionnaires and submersed their dominant hands in cold water. The temperature of their second and fifth digits was monitored during recovery. Both the objective cold-provocation testing and the subjective self-report questionnaires were highly reliable albeit not significantly correlated. No significant temperature recovery trend was noted between the age groups. Post-traumatic cold intolerance is postulated to have both a vascular and neural etiology among other contributing causes. The protocol studied here was centered predominantly on the former etiology, examining peripheral blood flow and associated temperature recovery. This study established ICE as a reliable means to objectively measure cold response, supplementing information provided by previously validated self-report methods.
Testing of materials from the Minnesota Cold Regions pavement research test facility
DOT National Transportation Integrated Search
1996-09-01
The U.S. Army Cold Regions Research and Engineering Laboratory (CRREL) conducted various laboratory tests on pavement materials from the Mn/ ROAD facility. The tests helped to characterize the behavior of materials under season frost conditions, and ...
Concept of a programmable maintenance processor applicable to multiprocessing systems
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1988-01-01
A programmable maintenance processor concept applicable to multiprocessing systems has been developed at the NASA Ames Research Center's Dryden Flight Research Facility. This stand-alone-processor is intended to provide support for system and application software testing as well as hardware diagnostics. An initial machanization has been incorporated into the extended aircraft interrogation and display system (XAIDS) which is multiprocessing general-purpose ground support equipment. The XAIDS maintenance processor has independent terminal and printer interfaces and a dedicated magnetic bubble memory that stores system test sequences entered from the terminal. This report describes the hardware and software embodied in this processor and shows a typical application in the check-out of a new XAIDS.
1999-01-07
Workers (right) at Astrotech, Titusville, Fla., arrange the lights for an illumination test on the solar panel of the GOES-L weather satellite. The test is verifying the circuitry on the panel. The satellite is to be launched from Cape Canaveral Air Station aboard an Atlas II rocket in late March. The GOES-L is the fourth of a new advanced series of geostationary weather satellites for the National Oceanic and Atmospheric Administration. It is a three-axis inertially stabilized spacecraft that will provide pictures and perform atmospheric sounding at the same time. Once launched, the satellite, to be designated GOES-11, will undergo checkout and provide backup capabilities for the existing, aging GOES East weather satellite
Study on Spacelab software development and integration concepts
NASA Technical Reports Server (NTRS)
1974-01-01
A study was conducted to define the complexity and magnitude of the Spacelab software challenge. The study was based on current Spacelab program concepts, anticipated flight schedules, and ground operation plans. The study was primarily directed toward identifying and solving problems related to the experiment flight application and tests and checkout software executing in the Spacelab onboard command and data management subsystem (CDMS) computers and electrical ground support equipment (EGSE). The study provides a conceptual base from which it is possible to proceed into the development phase of the Software Test and Integration Laboratory (STIL) and establishes guidelines for the definition of standards which will ensure that the total Spacelab software is understood prior to entering development.
NASA Technical Reports Server (NTRS)
Dicicco, L. Danielle; Nowlin, Brent C.; Tirres, Lizet
1992-01-01
The aerodynamic performance of a solid uncooled version of a cooled radial turbine was evaluated in the Small Engine Components Test Facility Turbine rig at the NASA Lewis Research Center. Specifically, an experiment was conducted to rotor surface static pressures. This was the first time surface static pressures had been measured on a radial turbine at NASA Lewis. These pressures were measured by a modified Rotating Data Package (RDP), a standard product manufactured by Scanivalve, Inc. Described here are the RDP, and the modifications that were made, as well as the checkout, installation, and testing procedures. The data presented are compared to analytical results obtained from NASA's MERIDL TSONIC BLAYER (MTSB) code.
NASA Technical Reports Server (NTRS)
Dicicco, L. D.; Nowlin, Brent C.; Tirres, Lizet
1992-01-01
The aerodynamic performance of a solid uncooled version of a cooled radial turbine was evaluated in the Small Engine Components Test Facility Turbine rig at the NASA Lewis Research Center. Specifically, an experiment was conducted to rotor surface static pressures. This was the first time surface static pressures had been measured on a radial turbine at NASA Lewis. These pressures were measured by a modified Rotating Data Package (RDP), a standard product manufactured by Scanivalve, Inc. Described here are the RDP, and the modifications that were made, as well as the checkout, installation, and testing procedures. The data presented are compared to analytical results obtained from NASA's MERIDL TSONIC BLAYER (MTSB) code.
Mobile LNG (liquified natural gas) gelator. Final report, July 1980-September 1981
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rudnicki, M.I.; Hoffman, L.C.; Newton, R.A.
1981-12-01
Gelled liquified natural gas (GELNG) offers potential safety advantages over LNG in the case of an accidental spill. GELNG has shown reduced spread area, lower vaporization rate, and crack sealing capability relative to the ungelled material. The purpose of this contract was to develop a mobile, continuous gelator which would produce a minimum of one cubic meter per hour of GELNG; previously, GELNG had been produced in small quantities by batch processes. Major achievements under the contract were the design and construction of the mobile gelator, checkout of the system with liquid nitrogen, and testing of the system on LNG.more » GELNG was not produced in the test series.« less
Experiment definition phase shuttle laboratory. LDRL-10.6 experiment
NASA Technical Reports Server (NTRS)
1976-01-01
The work completed on the experiment definition phase of the shuttle laboratory LDRL 10.6 micrometers experiment from 27 September 1975 to 26 January 1976 was reported. This work included progress in the following areas: (1) optomechanical system: completion of detail drawings, completion of the beryllium subassembly, fabrication, checking, and weighing of approximately 95% of the detailed parts, dry film lubrication of the bearings and gears, and initiation of assembly of the gimbals; (2) optics: update of the detailed optical layout, receipt of nine mirrors and the pre-expander; (3) miscellaneous: delivery of draft material for the final report, completion of optical testing of the 10.6 micrometers receiver, and receipt, assembly, and checkout of NASA test console.
1998-10-03
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), a technician begins testing on the Mars Polar Lander. The checkout includes a functional test of the science instruments and the basic spacecraft subsystems. The Mars Polar Lander is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere
Programmable Thermostats for MPLM Shell Heater Control ULF1. 1; Thermal Performances
NASA Technical Reports Server (NTRS)
Glasgow, Shaun; Clark, Dallas; Trichilo, Michele; Trichilo, Michele
2007-01-01
The Multi-Purpose Logistics Module (MPLM) is the primary carrier for "pressurized" logistics to and from the International Space Station (ISS). The MPLM is transported in the payload bay of the Space Shuttle and is docked to the ISS for unloading, and reloading, of contents within the ISS shirt sleeve environment. Foil heaters, controlled originally with bi-metallic thermostats, are distributed across the outside of the MPLM structure and are utilized to provide energy to the structure to avoid exposure to cold temperatures and prevent condensation. The existing bi-metallic, fixed temperature set point thermostats have been replaced with Programmable Thermostats Modules (PTMs) in the Passive Thermal Control Subsystem (PTCS) 28Vdc shell heater circuits. The goal of using the PTM thermostat is to improve operational efficiency of the MPLM on-orbit shell heaters by providing better shell temperature control via feedback control capability. Each heater circuit contains a programmable thermostat connected to an external temperature sensor, a Resistive Temperature Device (RTD), which is used to provide continuous temperature monitoring capability. Each thermostat has programmable temperature set points and control spans. The data acquisition system uses a standard RS-485 serial interface communications cable to provide digital control capability. The PTM system was designed by MSFC, relying upon ALTEC support for their integration within the MPLM system design, while KSC performed the installation and ground checkout testing of the thermostat and RS-485 communication cable on the MPLM FM1 flight module. The PTMs were used for the first time during the STS-121/ULF1.1 mission. This paper will describe the design, development and verification of the PTM system, as well as the PTM flight performance and comparisons with SINDA thermal model predictions.
Repeatability of a cold stress test to assess cold sensitization.
House, C M; Taylor, R J; Oakley, E H N
2015-10-01
Non-freezing cold injury (NFCI) is a syndrome in which damage to peripheral tissues occurs without the tissues freezing following exposure to low ambient temperatures. To assess the test-retest reliability of a cold stress test (CST) used to assess cold sensitization. Volunteers with no self-reported history of NFCI undertook the CST on three occasions. Thermal images were taken of the foot and hand before, immediately after and 5min after immersion of the limb in cold water for 2min. Cold sensitization was graded by the two clinicians and the lead author. Spot temperatures from the toe and finger pads were recorded. There were 30 white and 19 black male participants. The ratings indicated substantial agreement [a Cohen's kappa (κ) value of 0.61-0.8] to within ± one grading category for the hands and feet of the white volunteers and the hands of the black volunteers. Limits of agreement (LoA) analysis for toe and finger pad temperatures indicated high agreement (absolute 95% LoA < 5.5°C). Test-retest reliability for the feet of the black volunteers was not supported by the gradings (κ = 0.38) and toe pad temperatures (absolute 95% LoA = 9.5°C and coefficient of variation = 11%). The test-retest reliability of the CST is considered adequate for the assessment of the cold sensitization of the hands and feet of white and the hands of black healthy non-patients. The study should be repeated with patients who have suffered a NFCI. © Crown copyright 2015.
Space shuttle main engine definition (phase B). Volume 2: Avionics. [for space shuttle
NASA Technical Reports Server (NTRS)
1971-01-01
The advent of the space shuttle engine with its requirements for high specific impulse, long life, and low cost have dictated a combustion cycle and a closed loop control system to allow the engine components to run close to operating limits. These performance requirements, combined with the necessity for low operational costs, have placed new demands on rocket engine control, system checkout, and diagnosis technology. Based on considerations of precision environment, and compatibility with vehicle interface commands, an electronic control, makes available many functions that logically provide the information required for engine system checkout and diagnosis.
2003-10-15
KENNEDY SPACE CENTER, FLA. - Employees file around table displays under a tent near the Operations and Checkout Building. Many vendors and organizations displayed their products during the Spaceport Super Safety and Health Day at KSC and Cape Canaveral Air Force Station, an annual event dedicated to reinforcing safe and healthful behaviors in the workforce.
Firing Room Remote Application Software Development
NASA Technical Reports Server (NTRS)
Liu, Kan
2014-01-01
The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories subsystem. In addition, a Conversion Fusion project was created to show specific approved checkout and launch engineering data for public-friendly display purposes.
NASA Technical Reports Server (NTRS)
Steele, John; Chullen, Cinda; Morenz, Jesse; Stephenson, Curtis
2010-01-01
Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, workers move the Orion ground test vehicle, or GTA, into the Launch Equipment Test Facility, or LETF, from the Operations and Checkout Building. At the LETF, Lockheed Martin will put the GTA through a series of pyrotechnic bolt tests. The ground test vehicle is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, workers prepare to move the Orion ground test vehicle, or GTA, from the Operations and Checkout Building to the Launch Equipment Test Facility, or LETF. At the LETF, Lockheed Martin will put the GTA through a series of pyrotechnic bolt tests. The ground test vehicle is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, workers move the Orion ground test vehicle, or GTA, from the Operations and Checkout Building to the Launch Equipment Test Facility, or LETF. At the LETF, Lockheed Martin will put the GTA through a series of pyrotechnic bolt tests. The ground test vehicle is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, workers move the Orion ground test vehicle, or GTA, into the Launch Equipment Test Facility, or LETF, from the Operations and Checkout Building. At the LETF, Lockheed Martin will put the GTA through a series of pyrotechnic bolt tests. The ground test vehicle is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
40 CFR 86.1343-88 - Calculations; particulate exhaust emissions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... cold-start test, grams. (3) PH = Mass particulate measured during the hot-start test, grams. (4) BHP-hr..., grams per test phase. (PH = Pmass for the hot-start test and PC = Pmass for the cold-start test. (2... Exhaust Test Procedures § 86.1343-88 Calculations; particulate exhaust emissions. (a) The final reported...
40 CFR 86.1343-88 - Calculations; particulate exhaust emissions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... cold-start test, grams. (3) PH = Mass particulate measured during the hot-start test, grams. (4) BHP-hr..., grams per test phase. (PH = Pmass for the hot-start test and PC = Pmass for the cold-start test. (2... Exhaust Test Procedures § 86.1343-88 Calculations; particulate exhaust emissions. (a) The final reported...
Molinaro, V; Del Ferraro, S
2007-01-01
Supermarket checkouts are different in term of dimensions and arrangement of the essential devices for cashier's work. It means that a different layout can involve different tasks, so it is necessary to evaluate every single system in order to define the entity of required commitment for the worker. A supermarket checkout was considered in order to evaluate its workstation and to analyze the different tasks of two cashiers with similar anthropometric measurements. In particular one of them is affected by a widespread osteoarthritis, verified by instrumental tests and clinical examination. Several geometrical measures of the workstation were carried out while the cashiers were observed and filmed by videotapes during their activities. The study has been carried out by drawing the "preferred" and "maximal" working areas, as UNI EN ISO 14738:2004 suggests. Some tasks seem to be particularly critical especially for the cashier affected by osteoarthritis, who adopts compensatory postural mechanisms in order to use some devices which are not easy to reach inside the workstation, and which can induce pain to her. Finally the authors make some considerations about the opportunity of making a new layout of the workstation in order to find a more suitable arrangement of the devices.
Cold Antimatter Plasmas, and Aspirations for Cold Antihydrogen
2002-06-24
comparison of any baryon and antibaryon by almost a factor of CP606, Non-Neutral Plasma Physics IV, edited by F. Anderegg et al. © 2002 American...antiprotons 3 _one-electron .1 eV quantum cyclotron 0.001 K FIGURE 1. Particle energies a million. An improved baryon CPT test (e.g. involving cold...more precise tests of CPT invariance with baryons and leptons than have been realized so far. The pursuit of cold antihydrogen thus began some time ago
Effects of Cold Temperature and Ethanol Content on VOC Emissions from Light-Duty Gasoline Vehicles.
George, Ingrid J; Hays, Michael D; Herrington, Jason S; Preston, William; Snow, Richard; Faircloth, James; George, Barbara Jane; Long, Thomas; Baldauf, Richard W
2015-11-03
Emissions of speciated volatile organic compounds (VOCs), including mobile source air toxics (MSATs), were measured in vehicle exhaust from three light-duty spark ignition vehicles operating on summer and winter grade gasoline (E0) and ethanol blended (E10 and E85) fuels. Vehicle testing was conducted using a three-phase LA92 driving cycle in a temperature-controlled chassis dynamometer at two ambient temperatures (-7 and 24 °C). The cold start driving phase and cold ambient temperature increased VOC and MSAT emissions up to several orders of magnitude compared to emissions during other vehicle operation phases and warm ambient temperature testing, respectively. As a result, calculated ozone formation potentials (OFPs) were 7 to 21 times greater for the cold starts during cold temperature tests than comparable warm temperature tests. The use of E85 fuel generally led to substantial reductions in hydrocarbons and increases in oxygenates such as ethanol and acetaldehyde compared to E0 and E10 fuels. However, at the same ambient temperature, the VOC emissions from the E0 and E10 fuels and OFPs from all fuels were not significantly different. Cold temperature effects on cold start MSAT emissions varied by individual MSAT compound, but were consistent over a range of modern spark ignition vehicles.
McCue, Marshall D.; Sunny, Nishanth E.; Szejner-Sigal, Andre; Morgan, Theodore J.; Allison, David B.; Hahn, Daniel A.
2016-01-01
Metabolic flexibility is an important component of adaptation to stressful environments, including thermal stress and latitudinal adaptation. A long history of population genetic studies suggest that selection on core metabolic enzymes may shape life histories by altering metabolic flux. However, the direct relationship between selection on thermal stress hardiness and metabolic flux has not previously been tested. We investigated flexibility of nutrient catabolism during cold stress in Drosophila melanogaster artificially selected for fast or slow recovery from chill coma (i.e. cold-hardy or -susceptible), specifically testing the hypothesis that stress adaptation increases metabolic turnover. Using 13C-labelled glucose, we first showed that cold-hardy flies more rapidly incorporate ingested carbon into amino acids and newly synthesized glucose, permitting rapid synthesis of proline, a compound shown elsewhere to improve survival of cold stress. Second, using glucose and leucine tracers we showed that cold-hardy flies had higher oxidation rates than cold-susceptible flies before cold exposure, similar oxidation rates during cold exposure, and returned to higher oxidation rates during recovery. Additionally, cold-hardy flies transferred compounds among body pools more rapidly during cold exposure and recovery. Increased metabolic turnover may allow cold-adapted flies to better prepare for, resist and repair/tolerate cold damage. This work illustrates for the first time differences in nutrient fluxes associated with cold adaptation, suggesting that metabolic costs associated with cold hardiness could invoke resource-based trade-offs that shape life histories. PMID:27605506
Checkout and Standard Use Procedures for the Mark III Space Suit Assembly
NASA Technical Reports Server (NTRS)
Valish, Dana J.
2012-01-01
The operational pressure range is the range to which the suit can be nominally operated for manned testing. The top end of the nominal operational pressure range is equivalent to 1/2 the proof pressure. Structural pressure is 1.5 times the specified test pressure for any given test. Proof pressure is the maximum unmanned pressure to which the suit was tested by the vendor prior to delivery. The maximum allowable working pressure (MAWP) is 90% of the proof pressure. The pressure systems RVs are set to keep components below their MAWPs. If the suit is pressurized over its MAWP, the suit will be taken out of service and an in-depth inspection/review of the suit will be performed before the suit is put back in service. The procedures outlined in this document should be followed as written. However, the suit test engineer (STE) may make redline changes real-time, provided those changes are recorded in the anomaly section of the test data sheet. If technicians supporting suit build-up, check-out, and/or test execution believe that a procedure can be improved, they should notify their lead. If procedures are incorrect to the point of potentially causing hardware damage or affecting safety, bring the problem to the technician lead and/or STE s attention and stop work until a solution (temporary or permanent) is authorized. Certain steps in the procedure are marked with a DV , for Designated Verifier. The Designated Verifier for this procedure is an Advanced Space Suit Technology Development Laboratory technician, not directly involved in performing the procedural steps, who will verify that the step was performed as stated. The steps to be verified by the DV were selected based on one or more of the following criteria: the step was deemed significant in ensuring the safe performance of the test, the data recorded in the step is of specific interest in monitoring the suit system operation, or the step has a strong influence on the successful completion of test objectives. Prior to all manned test activities, Advanced Suit Test Data Sheet (TDS) Parts A-E shall be completed to verify system and team are ready for test. Advanced Suit TDS Parts F-G shall be completed at the end of the suited activity. Appendix B identifies tha appropriate Mark III suit emergency event procedures.
2012-09-05
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a crane is used to move the Orion Exploration Flight Test 1 crew module to the base of a birdcage tool. The birdcage will be used to continue installation of external components in preparation for Orion’s first uncrewed test flight in 2014 atop a Delta IV rocket. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, Lockheed Martin crews begin uncovering the Orion ground test vehicle in the Launch Equipment Test Facility, or LETF. The GTA was moved from the Operations and Checkout Facility to the LETF for a series of pyrotechnic bolt tests. The GTA is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
2013-05-13
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, Lockheed Martin crews uncover the Orion ground test vehicle in the Launch Equipment Test Facility, or LETF. The GTA was moved from the Operations and Checkout Facility to the LETF for a series of pyrotechnic bolt tests. The GTA is being used for path finding operations in the O&C, including simulated manufacturing and assembly procedures. Launching atop NASA's heavy-lift Space Launch System SLS, which also is under development, the Orion Multi-Purpose Crew Vehicle MPCV will serve as the exploration vehicle that will carry astronaut crews beyond low Earth orbit. It also will provide emergency abort capabilities, sustain the crew during space travel and provide safe re-entry from deep space return velocities. For more information, visit www.nasa.gov/orion. Photo credit: Jim Grossman
1999-02-24
KENNEDY SPACE CENTER, FLA. -- Looking as if poised in flight, the saucer-like lid of an altitude chamber is lifted from the floor in the Operations and Checkout Building high bay to its place on top of the chamber. The chamber was recently reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test
Impact of cold climates on vehicle emissions: the cold start air toxics pulse : final report.
DOT National Transportation Integrated Search
2016-09-21
This project measured cold start emissions from four vehicles in winter using fast response instrumentation to accurately measure the : time variation of the cold start emission pulse. Seventeen successful tests were conducted over a temperature rang...
The effect of ethnicity on the vascular responses to cold exposure of the extremities.
Maley, Matthew J; Eglin, Clare M; House, James R; Tipton, Michael J
2014-11-01
Cold injuries are more prevalent in individuals of African descent (AFD). Therefore, we investigated the effect of extremity cooling on skin blood flow (SkBF) and temperature (T sk) between ethnic groups. Thirty males [10 Caucasian (CAU), 10 Asian (ASN), 10 AFD] undertook three tests in 30 °C air whilst digit T sk and SkBF were measured: (i) vasomotor threshold (VT) test--arm immersed in 35 °C water progressively cooled to 10 °C and rewarmed to 35 °C to identify vasoconstriction and vasodilatation; (ii) cold-induced vasodilatation (CIVD) test--hand immersed in 8 °C water for 30 min followed by spontaneous warming; (iii) cold sensitivity (CS) test--foot immersed in 15 °C water for 2 min followed by spontaneous warming. Cold sensory thresholds of the forearm and finger were also assessed. In the VT test, vasoconstriction and vasodilatation occurred at a warmer finger T sk in AFD during cooling [21.2 (4.4) vs. 17.0 (3.1) °C, P = 0.034] and warming [22.0 (7.9) vs. 12.1 (4.1) °C, P = 0.002] compared with CAU. In the CIVD test, average SkBF during immersion was greater in CAU [42 (24) %] than ASN [25 (8) %, P = 0.036] and AFD [24 (13) %, P = 0.023]. Following immersion, SkBF was higher and rewarming faster in CAU [3.2 (0.4) °C min(-1)] compared with AFD [2.5 (0.7) °C min(-1), P = 0.037], but neither group differed from ASN [3.0 (0.6) °C min(-1)]. Responses to the CS test and cold sensory thresholds were similar between groups. AFD experienced a more intense protracted finger vasoconstriction than CAU during hand immersion, whilst ASN experienced an intermediate response. This greater sensitivity to cold may explain why AFD are more susceptible to cold injuries.
Gas-Centered Swirl Coaxial Liquid Injector Evaluations
NASA Technical Reports Server (NTRS)
Cohn, A. K.; Strakey, P. A.; Talley, D. G.
2005-01-01
Development of Liquid Rocket Engines is expensive. Extensive testing at large scales usually required. In order to verify engine lifetime, large number of tests required. Limited Resources available for development. Sub-scale cold-flow and hot-fire testing is extremely cost effective. Could be a necessary (but not sufficient) condition for long engine lifetime. Reduces overall costs and risk of large scale testing. Goal: Determine knowledge that can be gained from sub-scale cold-flow and hot-fire evaluations of LRE injectors. Determine relationships between cold-flow and hot-fire data.
NASA Technical Reports Server (NTRS)
Lovejoy, Andrew E.; Hilburger, Mark W.
2010-01-01
The Shell Buckling Knockdown Factor (SBKF) project includes the testing of sub-scale cylinders to validate new shell buckling knockdown factors for use in the design of the Ares-I and Ares-V launch vehicles. Test article cylinders represent various barrel segments of the Ares-I and Ares-V vehicles, and also include checkout test articles. Testing will be conducted at Marshall Space Flight Center (MSFC) for test articles having an eight-foot diameter outer mold line (OML) and having lengths that range from three to ten feet long. Both ends of the test articles will be connected to the test apparatus using attachment rings. Three multiple-piece and one single-piece design for the attachment rings were developed and analyzed. The single-piece design was chosen and will be fabricated from either steel or aluminum (Al) depending on the required safety factors (SF) for test hardware. This report summarizes the design and analysis of these attachment ring concepts.
Cold adaptation, aging, and Korean women divers haenyeo.
Lee, Joo-Young; Park, Joonhee; Kim, Siyeon
2017-08-08
We have been studying the thermoregulatory responses of Korean breath-hold women divers, called haenyeo, in terms of aging and cold adaptation. During the 1960s to the 1980s, haenyeos received attention from environmental physiologists due to their unique ability to endure cold water while wearing only a thin cotton bathing suit. However, their overall cold-adaptive traits have disappeared since they began to wear wetsuits and research has waned since the 1980s. For social and economic reasons, the number of haenyeos rapidly decreased to 4005 in 2015 from 14,143 in 1970 and the average age of haenyeos is about 75 years old at present. For the past several years, we revisited and explored older haenyeos in terms of environmental physiology, beginning with questionnaire and field studies and later advancing to thermal tolerance tests in conjunction with cutaneous thermal threshold tests in a climate chamber. As control group counterparts, older non-diving females and young non-diving females were compared with older haenyeos in the controlled experiments. Our findings were that older haenyeos still retain local cold tolerance on the extremities despite their aging. Finger cold tests supported more superior local cold tolerance for older haenyeos than for older non-diving females. However, thermal perception in cold reflected aging effects rather than local cold acclimatization. An interesting finding was the possibility of positive cross-adaptation which might be supported by greater heat tolerance and cutaneous warm perception thresholds of older haenyeos who adapted to cold water. It was known that cold-adaptive traits of haenyeos disappeared, but we confirmed that cold-adaptive traits are still retained on the face and hands which could be interpreted by a mode switch to local adaptation from the overall adaptation to cold. Further studies on cross-adaptation between chronic cold stress and heat tolerance are needed.
The availability of snack food displays that may trigger impulse purchases in Melbourne supermarkets
2012-01-01
Background Supermarkets play a major role in influencing the food purchasing behaviours of most households. Snack food exposures within these stores may contribute to higher levels of consumption and ultimately to increasing levels of obesity, particularly within socioeconomically disadvantaged neighbourhoods. We aimed to examine the availability of snack food displays at checkouts, end-of-aisle displays and island displays in major supermarket chains in the least and most socioeconomically disadvantaged neighbourhoods of Melbourne. Methods Within-store audits of 35 Melbourne supermarkets. Supermarkets were sampled from the least and most socioeconomically disadvantaged suburbs within 30 km of the Melbourne CBD. We measured the availability of crisps, chocolate, confectionery, and soft drinks (diet and regular) at the checkouts, in end-of-aisle displays, and in island bin displays. Results Snack food displays were most prominent at checkouts with only five stores not having snack foods at 100% of their checkouts. Snack foods were also present at a number of end-of-aisle displays (at both the front (median 38%) and back (median 33%) of store), and in island bin displays (median number of island displays: 7; median total circumference of island displays: 19.4 metres). Chocolate items were the most common snack food item on display. There was no difference in the availability of these snack food displays by neighbourhood disadvantage. Conclusions As a result of the high availability of snack food displays, exposure to snack foods is almost unavoidable in Melbourne supermarkets, regardless of levels of neighbourhood socioeconomic disadvantage. Results of this study could promote awareness of the prominence of unhealthy food items in chain-brand supermarkets outlets. PMID:22420759
40 CFR 86.208-94 - Dynamometer.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Passenger Vehicles; Cold Temperature Test Procedures § 86.208-94 Dynamometer. (a) For testing that is... the manufacturer, a dynamometer with different characteristics may be used provided cold CO emissions...
40 CFR 86.208-94 - Dynamometer.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Passenger Vehicles; Cold Temperature Test Procedures § 86.208-94 Dynamometer. (a) For testing that is... the manufacturer, a dynamometer with different characteristics may be used provided cold CO emissions...
40 CFR 86.208-94 - Dynamometer.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Passenger Vehicles; Cold Temperature Test Procedures § 86.208-94 Dynamometer. (a) For testing that is... the manufacturer, a dynamometer with different characteristics may be used provided cold CO emissions...
Dastmalchi, Nafiseh; Jafarzadeh, Hamid; Moradi, Saeed
2012-09-01
The ideal technique for the evaluation of pulp vitality should be noninvasive, painless, objective, reliable, and reproducible. To achieve this, the most routine tests are sensitivity tests. However, a major shortcoming with these tests is that they indirectly indicate pulp vitality by measuring a neural response. Pulse oximetry is a well-established oxygen saturation monitoring technique broadly used in medicine. However, its efficacy as the pulp vitality test should be evaluated. The aim of this study was to design and build a custom-made pulse oximeter dental probe and to evaluate its efficacy in comparison with electric pulp tester, cold spray, and a rubber cup in pulp vitality testing. Twenty-four single-canal mandibular premolars needing endodontic treatment were selected. The patients did not have systemic disease and did not consume drugs. Also, they had no clinically relevant signs of necrosis. The selected teeth were pulpally tested with 4 kinds of tests including pulse oximetry, the electric test, cold spray, and the rubber cup. After endodontic treatment of these teeth, which revealed the actual status of the pulp, the results were analyzed by the kappa test to show the efficacy of these tests. When comparing electric, cold, heat, and pulse oximeter tests with the gold standard, the kappa agreement coefficient was 18%, 18%, 14%, and 91%, respectively. The sensitivity of pulse oximetry, a rubber cup, electric test, and cold spray was 0.93, 0.60, 0.60, and 0.53, respectively. The specificity of these tests was 1.00, 0.55, 0.22, and 0.66, respectively. Pulp testing by using pulse oximetry is more reliable than the electric test, rubber cup, and cold spray. The custom-made pulse oximeter dental probe is an effective and objective method for pulp vitality assessment. Copyright © 2012 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.
Insulation Test Cryostat with Lift Mechanism
NASA Technical Reports Server (NTRS)
Dokos, Adam G. (Inventor); Fesmire, James E. (Inventor)
2014-01-01
A multi-purpose, cylindrical thermal insulation test apparatus is used for testing insulation materials and systems of materials using a liquid boil-off calorimeter system for absolute measurement of the effective thermal conductivity (k-value) and heat flux of a specimen material at a fixed environmental condition (cold-side temperature, warm-side temperature, vacuum pressure level, and residual gas composition). The apparatus includes an inner vessel for receiving a liquid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including the upper and lower guard chambers and a middle test vessel, is suspended from a lid of the vacuum canister. Each of the three chambers is filled and vented through a single feedthrough. All fluid and instrumentation feedthroughs are mounted and suspended from a top domed lid to allow easy removal of the cold mass. A lift mechanism allows manipulation of the cold mass assembly and insulation test article.
Insulation Test Cryostat with Lift Mechanism
NASA Technical Reports Server (NTRS)
Fesmire, James E. (Inventor); Dokos, Adam G. (Inventor)
2016-01-01
A multi-purpose, cylindrical thermal insulation test apparatus is used for testing insulation materials and systems of materials using a liquid boil-off calorimeter system for absolute measurement of the effective thermal conductivity (k-value) and heat flux of a specimen material at a fixed environmental condition (cold-side temperature, warm-side temperature, vacuum pressure level, and residual gas composition). An inner vessel receives liquid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including upper and lower guard chambers and middle test vessel, is suspended from a lid of the vacuum canister. Each of the three chambers is filled and vented through a single feedthrough. All fluid and instrumentation feedthroughs are mounted and suspended from a top domed lid allowing easy removal of the cold mass. A lift mechanism allows manipulation of the cold mass assembly and insulation test article.
Methodologies for Combined Loads Tests Using a Multi-Actuator Test Machine
NASA Technical Reports Server (NTRS)
Rouse, Marshall
2013-01-01
The NASA Langley COmbined Loads Test System (COLTS) Facility was designed to accommodate a range of fuselage structures and wing sections and subject them to both quasistatic and cyclic loading conditions. Structural tests have been conducted in COLTS that address structural integrity issues of metallic and fiber reinforced composite aerospace structures in support of NASA Programs (i.e. the Aircraft Structural Integrity (ASIP) Program, High-Speed-Research program and the Supersonic Project, NASA Engineering and Safety Center (NESC) Composite Crew Module Project, and the Environmentally Responsible Aviation Program),. This paper presents experimental results for curved panels subjected to mechanical and internal pressure loads using a D-box test fixture. Also, results are presented that describe use of a checkout beam for development of testing procedures for a combined mechanical and pressure loading test of a Multi-bay box. The Multi-bay box test will be used to experimentally verify the structural performance of the Multi-bay box in support of the Environmentally Responsible Aviation Project at NASA Langley.
Do mitochondrial properties explain intraspecific variation in thermal tolerance?
Fangue, Nann A; Richards, Jeffrey G; Schulte, Patricia M
2009-02-01
As global temperatures rise, there is a growing need to understand the physiological mechanisms that determine an organism's thermal niche. Here, we test the hypothesis that increases in mitochondrial capacity with cold acclimation and adaptation are associated with decreases in thermal tolerance using two subspecies of killifish (Fundulus heteroclitus) that differ in thermal niche. We assessed whole-organism metabolic rate, mitochondrial amount and mitochondrial function in killifish acclimated to several temperatures. Mitochondrial enzyme activities and mRNA levels were greater in fish from the northern subspecies, particularly in cold-acclimated fish, suggesting that the putatively cold-adapted northern subspecies has a greater capacity for increases in mitochondrial amount in response to cold acclimation. When tested at the fish's acclimation temperature, maximum ADP-stimulated (State III) rates of mitochondrial oxygen consumption in vitro were greater in cold-acclimated northern fish than in southern fish but did not differ between subspecies at higher acclimation temperatures. Whole-organism metabolic rate was greater in fish of the northern subspecies at all acclimation temperatures. Cold acclimation also changed the response of mitochondrial respiration to acute temperature challenge. Mitochondrial oxygen consumption was greater in cold-acclimated northern fish than in southern fish at low test temperatures, but the opposite was true at high test temperatures. These differences were reflected in whole-organism oxygen consumption. Our data indicate that the plasticity of mitochondrial function and amount differs between killifish subspecies, with the less high-temperature tolerant, and putatively cold adapted, northern subspecies having greater ability to increase mitochondrial capacity in the cold. However, there were few differences in mitochondrial properties between subspecies at warm acclimation temperatures, despite differences in both whole-organism oxygen consumption and thermal tolerance at these temperatures.
NASA Astrophysics Data System (ADS)
Hu, Chengliang; Chen, Lunqiang; Zhao, Zhen; Gong, Aijun; Shi, Weibing
2018-05-01
The combination of hot/warm and cold forging with an intermediate controlled cooling process is a promising approach to saving costs in the manufacture of automobile parts. In this work, the effects of the ferrite-pearlite microstructure, which formed after controlled cooling, on the cold forgeability of a medium-carbon steel were investigated. Different specimens for both normal and notched tensile tests were directly heated to high temperature and then cooled down at different cooling rates, producing different ferrite volume fractions, ranging from 6.69 to 40.53%, in the ferrite-pearlite microstructure. The yield strength, ultimate tensile strength, elongation rate, percentage reduction of area, and fracture strain were measured by tensile testing. The yield strength, indicating deformation resistance, and fracture strain, indicating formability, were used to evaluate the cold forgeability. As the ferrite volume fraction increased, the cold forgeability of the dual-phase ferritic-pearlitic steel improved. A quantitatively relationship between the ferrite volume fraction and the evaluation indexes of cold forgeability for XC45 steel was obtained from the test data. To validate the mathematical relationship, different tensile specimens machined from real hot-forged workpieces were tested. There was good agreement between the predicted and measured values. Our predictions from the relationship for cold forgeability had an absolute error less than 5%, which is acceptable for industrial applications and will help to guide the design of combined forging processes.
Cold adaptation shapes the robustness of metabolic networks in Drosophila melanogaster
Williams, CM; Watanabe, M; Guarracino, MR; Ferraro, MB; Edison, AS; Morgan, TJ; Boroujerdi, AFB; Hahn, DA
2015-01-01
When ectotherms are exposed to low temperatures, they enter a cold-induced coma (chill coma) that prevents resource acquisition, mating, oviposition, and escape from predation. There is substantial variation in time taken to recover from chill coma both within and among species, and this variation is correlated with habitat temperatures such that insects from cold environments recover more quickly. This suggests an adaptive response, but the mechanisms underlying variation in recovery times are unknown, making it difficult to decisively test adaptive hypotheses. We use replicated lines of Drosophila melanogaster selected in the laboratory for fast (hardy) or slow (susceptible) chill-coma recovery times to investigate modifications to metabolic profiles associated with cold adaptation. We measured metabolite concentrations of flies before, during, and after cold exposure using NMR spectroscopy to test the hypotheses that hardy flies maintain metabolic homeostasis better during cold exposure and recovery, and that their metabolic networks are more robust to cold-induced perturbations. The metabolites of cold-hardy flies were less cold responsive and their metabolic networks during cold exposure were more robust, supporting our hypotheses. Metabolites involved in membrane lipid synthesis, tryptophan metabolism, oxidative stress, energy balance, and proline metabolism were altered by selection on cold tolerance. We discuss the potential significance of these alterations. PMID:25308124
40 CFR 86.1413 - Fuel specifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Trucks; Certification Short Test Procedures § 86.1413 Fuel specifications. (a) The test fuel to be used... section. (b) CST test fuels by option. (1) Test Option 1: Use Cold CO fuel as specified in the table in § 86.213-94. (2) Test Option 2: Use Cold CO fuel, as specified in the table in § 86.213-94; optionally...
40 CFR 86.1413 - Fuel specifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Trucks; Certification Short Test Procedures § 86.1413 Fuel specifications. (a) The test fuel to be used... section. (b) CST test fuels by option. (1) Test Option 1: Use Cold CO fuel as specified in the table in § 86.213-94. (2) Test Option 2: Use Cold CO fuel, as specified in the table in § 86.213-94; optionally...
40 CFR 86.1413 - Fuel specifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Trucks; Certification Short Test Procedures § 86.1413 Fuel specifications. (a) The test fuel to be used... section. (b) CST test fuels by option. (1) Test Option 1: Use Cold CO fuel as specified in the table in § 86.213-94. (2) Test Option 2: Use Cold CO fuel, as specified in the table in § 86.213-94; optionally...
40 CFR 86.1413 - Fuel specifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Trucks; Certification Short Test Procedures § 86.1413 Fuel specifications. (a) The test fuel to be used... section. (b) CST test fuels by option. (1) Test Option 1: Use Cold CO fuel as specified in the table in § 86.213-94. (2) Test Option 2: Use Cold CO fuel, as specified in the table in § 86.213-94; optionally...
2. COLD FLOW LABORATORY, VIEW TOWARDS NORTH. Glenn L. ...
2. COLD FLOW LABORATORY, VIEW TOWARDS NORTH. - Glenn L. Martin Company, Titan Missile Test Facilities, Cold Flow Laboratory Building B, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
1. COLD FLOW LABORATORY, VIEW TOWARDS EAST. Glenn L. ...
1. COLD FLOW LABORATORY, VIEW TOWARDS EAST. - Glenn L. Martin Company, Titan Missile Test Facilities, Cold Flow Laboratory Building B, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
2006-09-26
KENNEDY SPACE CENTER, FLA. - NASA officials cut the ribbon to officially reactivate the Operations and Checkout Building's west door as entry to the crew exploration vehicle (CEV) environment. From left are Russell Romanella, director of the ISS Payload and Processing Directorate; Conrad Nagel, consultant for Space Florida; Jim Kennedy, director of KSC; Adrian Lafitte, director of government relations for Lockheed Martin; Mark Jager, program manager of Checkout, Assembly, Payloads Processing Services with Boeing; and Lynda Weatherman, with the Economic Development Commission. During the rest of the decade, KSC will transition from launching space shuttles to launching new vehicles in NASA’s Vision For Space Exploration. Photo credit: NASA/Kim Shiflett
2000-09-06
The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing
2000-09-06
The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing
41-D crew leaves operations and checkout building at KSC
1984-08-30
41D-3194 (30 Aug 1984)--- The six members of the 41-D Discovery crew leave the operations and checkout building at Kennedy Space to marke their way to Launch Pad 39A and a date with space. Leading the group is Henry W. hartsfield Jr., commander. Michael L. Coats, pilot, is left center. The mission specialists are Steven A. Hawley, second right, Richard M. (Mike) Mullane, right center, and Judith A. Resnik. Charles D. Walker, payload specialist, follows Resnik. Behind the blue-suited crewmembers are George W.S. Abbey, left, director of flight crew operations and John W. Young, chief of the astronaut office.
STS-29 crewmembers leave KSC Operations and Checkout (O&C) Building
1989-03-13
STS029-S-024 (13 March 1989) --- The flight crew for NASA's STS-29 mission leave the operations and checkout building en route to the van that will transport them to Launch Pad 39B, where Discovery awaits the astronauts for its second post-Challenge flight. Leading the way is astronaut Michael L. Coats, mission commander. He is followed by astronauts John E. Blaha, pilot; and James F. Buchli, James P. Bagian and Robert C. Springer, all mission specialists. In the background are astronaut Daniel C. Brandenstein, chief of the astronaut office, and Donald R. Puddy, director of flight crew operations.
Environmental control system transducer development study. [for space shuttles
NASA Technical Reports Server (NTRS)
Brudnicki, M. J.
1974-01-01
A development test program of transducers for aerospace projects is described. Stability and performance of existing transducers, and improvements compatible with shuttle ECS requirements are investigated. These requirements incorporate design and development features into the transducers, and include the following: (1) improvement of overall transducer ruggedness and reliability; (2) common transducers for all ECS fluids that will be unaffected by long quiescent periods in the space environment, that will require no maintenance or refurbishing for at least 100 launches; and (3) appropriate self-check features that simplify checkout and maintenance. Models of three different transducers, a three-way valve for pressure transducers from closed liquid loops, surface-type platinum-wire resistance temperature sensors, and a nuclenics gaging system are evaluated. Tests and development improvements are described.
Instrumentation & Data Acquisition System (D AS) Engineer
NASA Technical Reports Server (NTRS)
Jackson, Markus Deon
2015-01-01
The primary job of an Instrumentation and Data Acquisition System (DAS) Engineer is to properly measure physical phenomenon of hardware using appropriate instrumentation and DAS equipment designed to record data during a specified test of the hardware. A DAS system includes a CPU or processor, a data storage device such as a hard drive, a data communication bus such as Universal Serial Bus, software to control the DAS system processes like calibrations, recording of data and processing of data. It also includes signal conditioning amplifiers, and certain sensors for specified measurements. My internship responsibilities have included testing and adjusting Pacific Instruments Model 9355 signal conditioning amplifiers, writing and performing checkout procedures, writing and performing calibration procedures while learning the basics of instrumentation.
2013-11-07
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, the spacecraft adapter cone for the Orion spacecraft is positioned on special protective blocks for processing work. It will be mated to the service module for testing. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Daniel Casper
2013-11-07
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, the spacecraft adapter cone for the Orion spacecraft is positioned on special protective blocks for processing work. It will be mated to the service module for testing. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Daniel Casper
Reactor Simulator Testing Overview
NASA Technical Reports Server (NTRS)
Schoenfeld, Michael P.
2013-01-01
OBJECTIVE: Integrated testing of the TDU components TESTING SUMMARY: a) Verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. b) Thermal test heat regeneration design aspect of a cold trap purification filter. c) Pump performance test at pump voltages up to 150 V (targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V). TESTING HIGHLIGHTS: a) Gas and vacuum ground support test equipment performed effectively for NaK fill, loop pressurization, and NaK drain operations. b) Instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. c) Cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the cold temperature indicating the design provided some heat regeneration. d) ALIP produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.
40 CFR 1066.701 - Applicability and general provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Cold Temperature Test Procedures § 1066.701 Applicability and...) temperature range. (b) Do not apply the humidity correction factor in § 1066.615(a) for cold temperature...
Design and cold test of S-BAND cavity BPM for HLS
NASA Astrophysics Data System (ADS)
Luo, Qing; Sun, BaoGen; Jia, QiKa; He, DuoHui; Fang, Jia
2011-12-01
An S-band cavity BPM is designed for a new injector in National Synchrotron Radiation Laboratory. A re-entrant position cavity is tuned to the TM110 mode as position cavity. Cut-through waveguides are used as pickups to suppress the monopole signal. Theoretical resolution of this design is 31 nm. A prototype cavity BPM system is manufactured for off-line cold tests. The wire scanning method is used to calibrate the BPM and estimate the performance of the on-line BPM system. A cross-talk problem has been detected during the cold test. Racetrack cavity BPM design can be used to suppress the cross-talk. With the nonlinear effect being ignored, transform matrix can be used to correct cross-talk. Analysis of cold test results shows that the position resolution of prototype BPM is better than 3 μm.
DOE LeRC photovoltaic systems test facility
NASA Technical Reports Server (NTRS)
Cull, R. C.; Forestieri, A. F.
1978-01-01
The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.
Expert systems for automated maintenance of a Mars oxygen production system
NASA Astrophysics Data System (ADS)
Huang, Jen-Kuang; Ho, Ming-Tsang; Ash, Robert L.
1992-08-01
Application of expert system concepts to a breadboard Mars oxygen processor unit have been studied and tested. The research was directed toward developing the methodology required to enable autonomous operation and control of these simple chemical processors at Mars. Failure detection and isolation was the key area of concern, and schemes using forward chaining, backward chaining, knowledge-based expert systems, and rule-based expert systems were examined. Tests and simulations were conducted that investigated self-health checkout, emergency shutdown, and fault detection, in addition to normal control activities. A dynamic system model was developed using the Bond-Graph technique. The dynamic model agreed well with tests involving sudden reductions in throughput. However, nonlinear effects were observed during tests that incorporated step function increases in flow variables. Computer simulations and experiments have demonstrated the feasibility of expert systems utilizing rule-based diagnosis and decision-making algorithms.
NASA Technical Reports Server (NTRS)
Layton, G. P.
1984-01-01
New flight test techniques in use at Ames Dryden are reviewed. The use of the pilot in combination with ground and airborne computational capabilities to maximize data return is discussed, including the remotely piloted research vehicle technique for high-risk testing, the remotely augmented vehicle technique for handling qualities research, and use of ground computed flight director information to fly unique profiles such as constant Reynolds number profiles through the transonic flight regime. Techniques used for checkout and design verification of systems-oriented aircraft are discussed, including descriptions of the various simulations, iron bird setups, and vehicle tests. Some newly developed techniques to support the aeronautical research disciplines are discussed, including a new approach to position-error determination, and the use of a large skin friction balance for the measurement of drag caused by various excrescencies.