Science.gov

Sample records for commission impacto das

  1. Beyond Commissioning

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2004-08-31

    The emerging practice of building commissioning generally provides energy savings of 10% to, in some cases, more than 60% of a building's energy consumption. Moreover, commissioning ensures that equipment and systems are installed and operate properly, providing occupants with the conditions expected. Without commissioning, new buildings can have incorrect equipment installed, devices like fans installed backwards, and unimplemented control algorithms to mention a few deficiencies sometimes found. Existing buildings can have faulty and failed equipment such as clogged filters and coils, stuck dampers, leaky valves, and imbalanced air distribution, as well as overridden controls, improper set points, and incorrect schedules. Commissioning of new and existing buildings helps prevent and alleviate such problems. Yet only a small fraction of commercial buildings has ever been commissioned, and many buildings that have been commissioned have only a fraction of the recommended actions implemented. Time may change this situation or maybe other changes can accelerate the progress of commissioning. Will commissioning continue in the future as it is performed today or must it change? The authors share a vision for how the functions provided by commissioning could change in the future. The paper delves into the roles of automation technology for functional testing, diagnostics, prognostics, data management, asset tracking, and project management in building commissioning. Methods of delivery explored for these capabilities include laptop-, desktop-, and pda-based tools, web-based services, and ubiquitous embedded networked processing. The authors present a vision for how these technologies could change the practice of commissioning and the impacts this could bring for commercial buildings in the U.S. and throughout the world. Potential impacts on building performance, energy consumption, peak power, and occupant satisfaction are examined.

  2. Commissioning MMS

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  3. Joint Commission

    MedlinePlus

    Skip to main content The Joint Commission Log In | Request Guest Access Forgot password? | Log In Help Contact Us | Careers | JCR Web Store | Press Room Search Home Accreditation Accreditation Ambulatory Health ...

  4. Commission 28: Galaxies

    NASA Astrophysics Data System (ADS)

    Sadler, Elaine M.; Combes, Françoise; Okamura, Sadanori; Binney, James J.; Fairall, Anthony P.; Heckman, Timothy M.; Lilly, Simon J.; Karachentseva, Valentina; Kraan-Korteweg, Renée C.; Knapp, Gillian R.; Leibundgut, Bruno; Narlikar, Jayant V.

    2007-12-01

    The members of Commission 28 on Galaxies were very busy during this General Assembly, with the Commission involved in two Symposia (IAU Symposium No. 235 Galaxy Evolution across the Hubble Time, IAU Symposium No. 238 Black Holes: from Stars to Galaxies), and two Joint Discussions (JD07 The Universe at z > 6, JD15 New Cosmology Results from the Spitzer Space Telescope). Therefore, the Business Meeting was combined with the Division VIII Business Meeting, which included a short information session on the new Commission 28 Organizing Committee. The triennial report of the Commission for 2003-2005 was also distributed, and is available on the Commission 28 web site.

  5. Commissioning HVAC systems

    SciTech Connect

    Schiess, K.

    1995-12-01

    In recent years, commissioning has been viewed as a separate process that had to be specified and implemented by a specialized entity. This article discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and the USA. The differences between the British and the American methods of commissioning are discussed, with examples given where the American way was unsuccessful. It is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  6. DAS performance analysis

    SciTech Connect

    Bates, G.; Bodine, S.; Carroll, T.; Keller, M.

    1984-02-01

    This report begins with an overview of the Data Acquisition System (DAS), which supports several of PPPL's experimental devices. Performance measurements which were taken on DAS and the tools used to make them are then described.

  7. Guidelines for residential commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  8. THE COLLEGE COMMISSIONS.

    ERIC Educational Resources Information Center

    FOOKS, JOYCE LANE

    THE HISTORIES, ORGANIZATIONAL STRUCTURES, MODES OF OPERATION, GOALS, AND SPECIFIC ACTIVITIES OF EIGHT COLLEGE SCIENCE COMMISSIONS ARE PRESENTED. THE GOAL OF THE EIGHT COLLEGE SCIENCE COMMISSIONS IS TO BRING UNDERGRADUATE SCIENCE INSTRUCTION CLOSER TO THE RESEARCH FRONTIER, UPDATE COURSES, AND FOSTER THE SPIRIT OF INQUIRY. INTERCOMMISSION…

  9. The Building Commissioning Handbook.

    ERIC Educational Resources Information Center

    Heinz, John A.; Casault, Rick

    This book discusses building commissioning, which is the process of certifying that a new facility meets the required specifications. As buildings have become more complex, the traditional methods for building start-up and final acceptance have been proven inadequate, and building commissioning has been developed, which often necessitates the use…

  10. Get into Commission

    ERIC Educational Resources Information Center

    Limback, Derek

    2012-01-01

    Teachers may be apprehensive about commissioning, and frequently directors do not see it as realistic for their programs. It took the author a while to commission a piece, even though he is often on the composer side. The author asserts that there's already plenty of high-quality literature out there to keep teachers busy, but a bigger factor is…

  11. Commissioning of HVAC systems

    SciTech Connect

    Schiess, K.

    1995-06-01

    In recent years various presentation and discussions have taken place which looked at commissioning as a separate process that had to be specified and implemented by a specialized entity in a project. This presentation discusses commissioning in the HVAC field and looks at it from an international perspective. The author has worked in Europe, South Africa (British system) and in the USA. The differences are discussed between the British and the American methods with some examples where the American way of commissioning was unsuccessful. The conclusion is that it is the design engineer`s job to test and accept (commission) an installation after the contractor has demonstrated the performance to the satisfaction of the design engineer. Once the plant is commissioned, it is put into service.

  12. Nuclear Regulatory Commission issuances

    SciTech Connect

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  13. Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  14. State Emergency Response Commissions

    EPA Pesticide Factsheets

    The Governor of each state has designated a State Emergency Response Commission (SERC) that is responsible for implementing the Emergency Planning and Community Right-to-Know Act (EPCRA) provisions within its state.

  15. Commissioning the LCLS Injector

    SciTech Connect

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC

    2007-11-28

    The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  16. SPEAR3 Commissioning

    SciTech Connect

    Harkay, K.; Sajaev, V.; Boland, M.J.; Tan, Y.E.; Krinsky, S.; Podobedov, B.; Decking, W.; Ropert, A.; Byrd, J.M.; Robin, D.; Scarvie, T.; Steier, C.; Fedurin, M.G.; Jines, P.; Chang, H.-P.; Kuo, C.-C.; Tsai, H.-J.; Yoon, M.H.; Boge, M.; Allison, S.; Bellomo, P.; /SLAC, SSRL /SOLEIL, Saint-Aubin

    2005-05-09

    The successful commissioning of the new SPEAR3 light source at the Stanford Synchrotron Radiation Laboratory (SSRL) will be reviewed. Orbit control, beam-based alignment, and an orbit interlock were commissioned. Orbit motion was characterized as a function of frequency. The linear optics was corrected for ID focusing and coupling errors. The nonlinear optics were investigated with dynamic aperture measurements as a function of energy and tune.

  17. Commission 51: Bioastronomy

    NASA Astrophysics Data System (ADS)

    Irvine, William; Ehrenfreund, Pascale; Boss, Alan; Cosmovici, Cristiano; Kwok, Sun; Levasseur-Regourd, Anny-Chantal; Morrison, David; Udry, Stephane

    2010-05-01

    Commission 51 met on August 12, 2009. Outgoing President Alan Boss chaired the meeting, and there were several dozen members present, including incoming President William Irvine, incoming Vice President Pascale Ehrenfreund, and outgoing Past President Karen Meech. Commission 51 (C51) was re-authorized for a term of six more years at the 2006 Prague General Assembly of the IAU, and hence comes up for renewal at the 2012 IAU General Assembly in Beijing, China.

  18. Commissioning Experience of SNS

    SciTech Connect

    Plum, Michael A

    2007-07-01

    The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H{sup -} front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs in January-February and April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS linac will be presented.

  19. Commissioning of CEBAF

    SciTech Connect

    Andrew Hutton

    1994-06-01

    Construction of the CEBAF accelerator, a 4 GeV CW recirculating linac, is virtually complete. The 338 power sources and superconducting RF cavities, which have all run above nominal operating gradient in vertical tests (average 10.7 MeV/m), are installed. All the major components of the nine recirculation arcs are installed and aligned. Pre-commissioning was performed in parallel with construction. Ninety-nine superconducting cavities were operated simultaneously at the nominal gradient of 5 MeV/m. A maximum beam current of 110 PA CW (ZOO PA design) was reached. A cryomodule with eight cavities has operated at 8 MeV/m. Commissioning of the entire machine began in May 94. Results obtained during commissioning of the two linacs and the first arc are presented. 600 MeV beam is ready to be brought to the first experimental hall meeting a DOE milestone established in 1988.

  20. ATF2 Commissioning

    SciTech Connect

    Seryi, A.; Christian, G.; Parker, B.; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; Wolski, A.; Elsen, E.; Sanuki, T.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; Takahashi, T.; Bai, S.; Gao, J.; Bolzon, B.; Geffroy, N.; Jeremie, A.; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  1. 78 FR 12412 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... From the Federal Register Online via the Government Publishing Office ] SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on March 21, 2013, in Harrisburg...

  2. 77 FR 28420 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on June 7, 2012, in Binghamton, New...

  3. 77 FR 70204 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on December 14, 2012, in Annapolis...

  4. 78 FR 52601 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ... COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on September 19, 2013, in Binghamton, New York. Details concerning the matters to be addressed at the business meeting are contained in the...

  5. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  6. Conservation Commissions in Massachusetts.

    ERIC Educational Resources Information Center

    Scheffey, Andrew J. W.

    The Conservation Foundation reported on the experience of a resource development specialist in the state of Massachusetts on the public's growing concern for environmental quality. After tracing the origins of the Massachusetts movement, the report draws upon a variety of specific state experiences to illustrate the commission's growing pains and…

  7. Legal Commission Report

    ERIC Educational Resources Information Center

    American Indian Journal, 1977

    1977-01-01

    The Legal Commission of the International Non-Governmental Organizations Conference on Discrimination Against Indigenous Populations adopted the following agenda: legal status of indigenous populations; the land question; indigenous laws and courts; discrimination against indigenous peoples in existing laws and their application; and creation of…

  8. Ethics Commission Member's Comment.

    ERIC Educational Resources Information Center

    Riley, Sue Spayth

    1988-01-01

    Presents a National Association for the Education of Young Children (NAEYC) Ethics Commission member's comments and suggestions about how early childhood educators can best make sound decisions about the ethical dilemma of the welfare of the child and the confidentiality of its divorced parents. (BB)

  9. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    Expedition 29 Soyuz Commander Anton Shkaplerov speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011 at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  10. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    Expedition 29 Russian Flight Engineer Anatoly Ivanishin speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011 at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  11. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    NASA Expedition 29 backup crew member Joseph Acaba speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011 at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  12. Expedition 28 State Commission

    NASA Image and Video Library

    2011-06-06

    Expedition 28 NASA Flight Engineer Mike Fossum stands during the State Commission meeting to approve the Soyuz launch of Expedition 28 to the International Space Station, Monday, June 6, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch on Tuesday, June 8, from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  13. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    Michael Suffredini, Manager, International Space Station (ISS) Program speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  14. Expedition 28 State Commission

    NASA Image and Video Library

    2011-06-06

    Expedition 28 Russian backup Flight Engineer Oleg Kononenko is seen seated during the State Commission meeting to approve the Soyuz launch of Expedition 28 to the International Space Station, Monday, June 6, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch on Tuesday, June 8, from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  15. Expedition 33 State Commission

    NASA Image and Video Library

    2012-10-22

    Members of the State Commission meet at the Cosmosnaut hotel to approve the Soyuz launch of Expedition 33/34 Flight Engineer Kevin Ford of NASA, Soyuz Commander Oleg Novitskiy and Flight Engineer Evgeny Tarelkin of ROSCOSMOS on Monday, Oct. 22, 2012 in Baikonur, Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  16. Expedition 28 State Commission

    NASA Image and Video Library

    2011-06-06

    Michael Suffredini, Manager, International Space Station (ISS) Program, center, speaks during the State Commission meeting to approve the Soyuz launch of Expedition 28 to the International Space Station, Monday, June 6, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch on on Tuesday, June 8, from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  17. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    Vladimir Popovkin, Head of the Russian Federal Space Agency (ROSCOSMOS) speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  18. Expedition 41 State Commission

    NASA Image and Video Library

    2014-09-24

    Michael Suffredini, NASA International Space Station Program Manager, speaks during the State Commission meeting to approve the Soyuz launch of Expedition 41 to the International Space Station, Wednesday, Sept. 24, 2014, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch Sept. 26 from the Baikonur Cosmodrome. Photo Credit: (NASA/Aubrey Gemignani)

  19. Expedition 29 State Commission

    NASA Image and Video Library

    2011-11-12

    Expedition 29 backup crew member Sergei Revin speaks during the State Commission meeting to approve the Soyuz launch of Expedition 29 to the International Space Station, Saturday, Nov. 12, 2011 at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch November 14 from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  20. Expedition 28 State Commission

    NASA Image and Video Library

    2011-06-06

    Vladimir Popovkin, Head of the Russian Federal Space Agency (ROSCOSMOS) speaks during the State Commission meeting to approve the Soyuz launch of Expedition 28 to the International Space Station, Monday, June 6, 2011, at the Cosmonaut Hotel in Baikonur, Kazakhstan. The mission is set to launch on Tuesday, June 8, from the Baikonur Cosmodrome. Photo Credit: (NASA/Carla Cioffi)

  1. Nuclear Regulatory Commission issuances

    SciTech Connect

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  2. Commission on Liberal Learning

    ERIC Educational Resources Information Center

    Hazzard, George W.

    1976-01-01

    Study emphasis within the Commission on Liberal Learning during the year was on the role of liberal education in the society of the future. The relationship of undergraduate liberal education to the world macro-problem--population growth, industrial production, food, materials and energy scarcities, pollution and environmental degradation--was…

  3. Federal Election Commission.

    ERIC Educational Resources Information Center

    Elliot, Lee Ann

    1996-01-01

    Presents a concise overview of the responsibilities, membership, structure, and requirements of the Federal Election Commission (FEC). Created in 1974, the FEC oversees the financial activities of candidates and political parties. Discusses corporate and union political action committees (PACs) as well as contribution limits and prohibitions. (MJP)

  4. Nuclear Regulatory Commission Issuances

    SciTech Connect

    Not Available

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  5. Commissioning the Majorana Demonstrator

    NASA Astrophysics Data System (ADS)

    Xu, Wenqin; Majorana Collaboration

    2016-03-01

    The Majorana Demonstrator deploys high purity germanium (HPGe) detector modules to search for neutrinoless double beta (0 νββ) decay in 76Ge. The experiment is aimed at demonstrating the technical feasibility and low backgrounds for a next generation Ge-based BBz experiment. The program of testing and commissioning the Demonstrator modules is a critical step to debug and improve the experimental apparatus, to establish and refine operational procedures, and to develop data analysis tools. In this talk, we will discuss our experience commissioning the Demonstrator modules and show how this program leads to successful data-taking. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, the Particle Astrophysics and Nuclear Physics Programs of the National Science Foundation, and the Sanford Underground Research Facility.

  6. Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Rucinski, Slavek M.; Ribas, Ignasi; Giménez, Alvaro; Harmanec, Petr; Hilditch, Ronald W.; Kaluzny, Janusz; Niarchos, Panayiotis; Nordström, Birgitta; Oláh, Katalin; Richards, Mercedes T.; Scarfe, Colin D.; Sion, Edward M.; Torres, Guillermo; Vrielmann, Sonja

    2010-05-01

    During the commission business session, the past President presented the new Organizing Committee which was selected by the OC through a e-mail vote conducted during the months before the Rio de Janeiro General Assembly. The new OC will consist of Ignasi Ribas (President), Mercedes Richards (Vice President), and Slavek Rucinski (Past President) with the members: David Bradstreet, Petr Harmanec, Janusz Kaluzny, Joanna Mikolajewska, Ulisse Munari, Panos Niarchos, Katalin Olah, Theo Pribulla, Colin Scarfe and Guillermo Torres.

  7. Nuclear Regulatory Commission issuances

    SciTech Connect

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  8. Expedition 39 State Commission

    NASA Image and Video Library

    2014-03-24

    General Director of the Russian Federal Space Agency, Roscosmos, Oleg Ostapenko, as seen during the State Commission meeting to approve the Soyuz rocket launch of Expedition 39 Soyuz Commander Alexander Skvortsov of the Russian Federal Space Agency, Flight Engineer Steve Swanson of NASA, and Flight Engineer Oleg Artemyev of Roscosmos on a six month mission aboard the International Space Station, Monday, March 24, 2014 at the Cosmonaut Hotel in Baikonur, Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  9. Expedition 38 State Commission

    NASA Image and Video Library

    2013-11-06

    Members of the State Commission meet to approve the Soyuz rocket launch of Expedition 38 Soyuz Commander Mikhail Tyurin of Roscosmos, Flight Engineer Koichi Wakata of the Japan Aerospace Exploration Agency, and, Flight Engineer Rick Mastracchio of NASA for a six month mission aboard the International Space Station, Wednesday, Nov. 6, 2013 at the Cosmonaut Hotel in Baikonur, Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  10. Expedition 38 State Commission

    NASA Image and Video Library

    2013-11-06

    President of RSC Energia, Designer General V.A. Lopota, talks during the State Commission meeting to approve the Soyuz rocket launch of Expedition 38 Soyuz Commander Mikhail Tyurin of Roscosmos, Flight Engineer Koichi Wakata of the Japan Aerospace Exploration Agency, and, Flight Engineer Rick Mastracchio of NASA for a six month mission aboard the International Space Station, Wednesday, Nov. 6, 2013 at the Cosmonaut Hotel in Baikonur, Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  11. Expedition 38 State Commission

    NASA Image and Video Library

    2013-11-06

    JAXA (Japan Aerospace Exploration Agency) President Naoki Okumura talks during the State Commission meeting to approve the Soyuz rocket launch of Expedition 38 Soyuz Commander Mikhail Tyurin of Roscosmos, Flight Engineer Koichi Wakata of the Japan Aerospace Exploration Agency, and, Flight Engineer Rick Mastracchio of NASA for a six month mission aboard the International Space Station, Wednesday, Nov. 6, 2013 at the Cosmonaut Hotel in Baikonur, Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  12. A Guide to Building Commissioning

    SciTech Connect

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  13. Nuclear Regulatory Commission information digest

    SciTech Connect

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  14. Expedition 18 State Commission

    NASA Image and Video Library

    2008-10-10

    The State Commission gives the approval for launch of the Soyuz TMA-13 spacecraft carrying Expedition 18 Commander Michael Fincke, Flight Engineer Yuri V. Lonchakov and American spaceflight participant Richard Garriott to the International Space Station, Saturday, Oct. 11, 2008, in Baikonur, Kazakhstan. The three crew members are scheduled to launch Oct. 12 for a docking with the International Space Station on Oct. 14. Fincke and Lonchakov will spend six months on the station, while Garriott will return to Earth Oct. 24 with two of the Expedition 17 crew members currently on the International Space Station. Photo Credit: (NASA/Bill Ingalls)

  15. Expedition 18 State Commission

    NASA Image and Video Library

    2008-10-10

    Expedition 18 Flight Engineer Yuri V. Lonchakov, left, and Expedition 18 Commander Michael Fincke listen to the State Commission give the approval for launch of the Soyuz TMA-13 spacecraft, Saturday, Oct. 11, 2008, in Baikonur, Kazakhstan. Lonchakov, Fincke and American spaceflight participant Richard Garriott are scheduled to launch Oct. 12 and then to dock with the International Space Station on Oct. 14. Fincke and Lonchakov will spend six months on the station, while Garriott will return to Earth Oct. 24 with two of the Expedition 17 crew members currently on the International Space Station. Photo Credit: (NASA/Bill Ingalls)

  16. Expedition 18 State Commission

    NASA Image and Video Library

    2008-10-10

    A Russian flight surgeon, right, along with the quarantined prime and backup crews listen to the State Commission give the final approval for the launch of the Soyuz TMA-13 spacecraft, Saturday, Oct. 11, 2008 in Baikonur, Kazakhstan. Expedition 18 Commander Michael Fincke, Flight Engineer Yuri V. Lonchakov and American spaceflight participant Richard Garriott are scheduled to launch Oct. 12 and dock with the International Space Station on Oct. 14. Fincke and Lonchakov will spend six months on the station, while Garriott will return to Earth Oct. 24 with two of the Expedition 17 crew members currently on the International Space Station. Photo Credit: (NASA/Bill Ingalls)

  17. The SNS RFQ Commissioning

    SciTech Connect

    Ratti, A.; Ayers, J.; Doolittle, L.; DiGennaro, R.; Gough, R.A.; Hoff, M.; Keller, R.; MacGill, J.; Staples, J.; Thomae, R.; Virostek, S.; Yourd, R.; Aleksandrov, A.

    2002-08-16

    LBNL has built for the Spallation Neutron Source (SNS) project a 402.5 MHz RFQ that is designed to accelerate up to 60 mA H{sup -} from 65 keV to 2.5 MeV [1]. A one millisecond pulse length at 60 Hz provides a 6% duty factor. The RFQ has now been built, conditioned at full duty factor and tested with beam. This paper will present results from the final installation, tuning and beam commissioning. Beam measurements include acceleration and transport efficiencies and transverse emittances. The LEBT optics were tuned for best results. Performance testing of the RF power distribution is also discussed here.

  18. SNS Cryogenic Systems Commissioning

    NASA Astrophysics Data System (ADS)

    Hatfield, D.; Casagrande, F.; Campisi, I.; Gurd, P.; Howell, M.; Stout, D.; Strong, H.; Arenius, D.; Creel, J.; Dixon, K.; Ganni, V.; Knudsen, P.

    2006-04-01

    The Spallation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning and future plans will be presented.

  19. Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Defraigne, Pascale; Manchester, Richard; Matsakis, Demetrios; Petit, Gerard; Hosokawa, Mizuhiko; Leschiutta, Sigfrid; Zhai, Zao-Cheng

    2010-05-01

    Dr R. N. Manchester and Dr M. Hosokawa have been elected as, respectively, the new President and Vice-President of the Commission for the next term, 2009-2012. Concerning the Organizing Committee (OC) Members, we welcome as new members: Felicitas Aris (BIPM, France), Philip Tuckey (LNE-SYRTE, France), Vladimir Zharov (MSU, Russia), and Shougang Zhang (NTSC, China) and we acknowledge the outgoing members: Demetrios Matsakis, Gerard Petit, Mizuhiko Hosokawa, Sigfrid Leschiutta and Zao-Cheng Zhai. P. Defraigne remains on the OC as immediate Past-President.

  20. SNS Cryogenic Systems Commissioning

    SciTech Connect

    D. Hatfield; F. Casagrande; I. Campisi; P. Gurd; M. Howell; D. Stout; H. Strong; D. Arenius; J. Creel; K. Dixon; V. Ganni; and P. Knudsen

    2005-08-29

    The Spallation Neutron Source (SNS) is under construction at Oak Ridge National Laboratory. The cold section of the Linac consists of 81 superconducting radio frequency cavities cooled to 2.1K by a 2400 watt cryogenic refrigeration system. The major cryogenic system components include warm helium compressors with associated oil removal and gas management, 4.5K cold box, 7000L liquid helium dewar, 2.1K cold box (consisting of 4 stages of cold compressors), gaseous helium storage, helium purification and gas impurity monitoring system, liquid nitrogen storage and the cryogenic distribution transfer line system. The overall system commissioning and future plans will be presented.

  1. DAS User Manual

    NASA Astrophysics Data System (ADS)

    Østensen, Roy

    2008-10-01

    The HELAS Database for AsteroSeismology (DAS) is one of the deliverables of the Work Package NA5: Asteroseismology of the European Coordination Action in Helio- and Asteroseismology (HELAS). The DAS aims to provide easy access to publicly available asteroseismological timeseries data, both photometric and spectroscopic. In particular, the DAS and the HELAS software package FAMIAS are ideally suited to train Master and PhD students in asteroseismic data analysis and to build longterm datasets. The number of stars in the system is still limited and reflects the willingness of data owners to provide their data after publication. Work continues to populate the database with contributions from the community, and at present the number of stars in the database is 82

  2. Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Schrijver, Carolus J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2012-04-01

    Commission 10 of the International Astronomical Union has more than 650 members who study a wide range of activity phenomena produced by our nearest star, the Sun. Solar activity is intrinsically related to solar magnetic fields and encompasses events from the smallest energy releases (nano- or even picoflares) to the largest eruptions in the Solar System, coronal mass ejections (CMEs), which propagate into the Heliosphere reaching the Earth and beyond. Solar activity is manifested in the appearance of sunspot groups or active regions, which are the principal sources of activity phenomena from the emergence of their magnetic flux through their dispersion and decay. The period 2008-2009 saw an unanticipated extended solar cycle minimum and unprecedentedly weak polar-cap and heliospheric field. Associated with that was the 2009 historical maximum in galactic cosmic rays flux since measurements begun in the middle of the 20th Century. Since then Cycle 24 has re-started solar activity producing some spectacular eruptions observed with a fleet of spacecraft and ground-based facilities. In the last triennium major advances in our knowledge and understanding of solar activity were due to continuing success of space missions as SOHO, Hinode, RHESSI and the twin STEREO spacecraft, further enriched by the breathtaking images of the solar atmosphere produced by the Solar Dynamic Observatory (SDO) launched on 11 February 2010 in the framework of NASA's Living with a Star program. In August 2012, at the time of the IAU General Assembly in Beijing when the mandate of this Commission ends, we will be in the unique position to have for the first time a full 3-D view of the Sun and solar activity phenomena provided by the twin STEREO missions about 120 degrees behind and ahead of Earth and other spacecraft around the Earth and ground-based observatories. These new observational insights are continuously posing new questions, inspiring and advancing theoretical analysis and

  3. Commission 45: Spectral Classification

    NASA Astrophysics Data System (ADS)

    Giridhar, Sunetra; Gray, Richard O.; Corbally, Christopher J.; Bailer-Jones, Coryn A. L.; Eyer, Laurent; Irwin, Michael J.; Kirkpatrick, J. Davy; Majewski, Steven; Minniti, Dante; Nordström, Birgitta

    This report gives an update of developments (since the last General Assembly at Prague) in the areas that are of relevance to the commission. In addition to numerous papers, a new monograph entitled Stellar Spectral Classification with Richard Gray and Chris Corbally as leading authors will be published by Princeton University Press as part of their Princeton Series in Astrophysics in April 2009. This book is an up-to-date and encyclopedic review of stellar spectral classification across the H-R diagram, including the traditional MK system in the blue-violet, recent extensions into the ultraviolet and infrared, the newly defined L-type and T-type spectral classes, as well as spectral classification of carbon stars, S-type stars, white dwarfs, novae, supernovae and Wolf-Rayet stars.

  4. Expedition 38 State Commission

    NASA Image and Video Library

    2013-11-06

    Expedition 38 Flight Engineer Koichi Wakata of the Japan Aerospace Exploration Agency, left, Soyuz Commander Mikhail Tyurin of Roscosmos, and, Flight Engineer Rick Mastracchio of NASA, right, are seen behind glass, while in quarantine, during the State Commission meeting held to approve the Soyuz launch of the crew for a six month mission aboard the International Space Station, Wednesday, Nov. 6, 2013 at the Cosmonaut Hotel in Baikonur, Kazakhstan. An Olympic torch that will be launched with the crew for a four-day visit to the station is seen on the left. The torch will return to Earth with another trio of station residents on Nov. 11 and will be part of the torch relay that ends with the lighting of the flame at the Fisht Stadium in Sochi, Russia Feb. 7 to mark the opening of the 2014 Winter Olympics. Photo Credit: (NASA/Bill Ingalls)

  5. Model Commissioning Plan and Guide Specifications

    SciTech Connect

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  6. Commissioning of NSLS-II

    SciTech Connect

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  7. Das DNA-Puzzle

    NASA Astrophysics Data System (ADS)

    Kirchner, Stefan

    Im Jahre 1953 wurde von James Watson und Francis Crick erstmalig der strukturelle Aufbau der sogenannten DNA (Desoxyribonukleinsäure) beschrieben, welche das Erbgut jedes Lebewesens enthält. Der wesentliche Teil des Erbguts wird dabei durch eine sehr lange Folge der vier Basen Adenin (A), Cytosin (C), Guanin (G) und Thymin (T) codiert. Seit einigen Jahren ist es möglich, die Folge der vier Basen zu einer gegebenen DNA zu bestimmen. Biologen bezeichnen diesen Vorgang als Sequenzierung.

  8. Commissioning a Hodoscope Detector

    NASA Astrophysics Data System (ADS)

    Lulis, Andrew; Merhi, Abdul; Frank, Nathan; Bazin, Daniel; Smith, Jenna; Thoennessen, Michael; MoNA Collaboration

    2013-10-01

    Experiments on neutron-rich nuclei are interesting since they test the limits of current nuclear theory. One method to populate neutron-rich nuclei is to utilize the (d,p) reaction in which the beam nucleus picks up a neutron from the target. This heavier nucleus immediately emits a neutron resulting in the same nucleus as the beam but with lower energy. One challenge is to discriminate decay products from unreacted beam particles by their difference in energy. A hodoscope was recently installed at the National Superconducting Cyclotron Laboratory (NSCL) as part of the MoNA-LISA-Sweeper setup to make experiments using a (d,p) reaction possible. The hodoscope is a 5 × 5 scintillator array consisting of CsI(Na) crystals with a resolution of better than 1%. This presentation will describe the recently commissioned detector and the results of the first data analysis using this device. Work supported by Augustana College and the National Science Foundation grant #0969173.

  9. Commissioning the SNO+ detector

    NASA Astrophysics Data System (ADS)

    Descamps, Freija; SNO+ Collaboration

    2016-09-01

    The SNO+ experiment is the successor to the Sudbury Neutrino Observatory (SNO), in which SNO's heavy water is replaced by approximately 780T of liquid scintillator (LAB). The combination of the 2km underground location, the use of ultra-clean materials and the high light-yield of the liquid scintillator means that a low background level and a low energy threshold can be achieved. This creates a new multipurpose neutrino detector with the potential to address a diverse set of physics goals, including the detection of reactor, solar, geo- and supernova neutrinos. A main physics goal of SNO+ is the search for neutrinoless double beta decay. By loading the liquid scintillator with 0.5% of natural Tellurium, resulting in about 1300kg of 130Te (isotopic abundance is slightly over 34%), a competitive sensitivity to the effective neutrino mass can be reached. This talk will present the status of the SNO+ detector, specifically the results and status of the detector commissioning with water.

  10. ALICE TPC commissioning results

    NASA Astrophysics Data System (ADS)

    Larsen, D. T.; Alice Tpc Collaboration

    2010-05-01

    ALICE is a dedicated heavy-ion experiment at CERN LHC aiming to study the properties of the quark-gluon plasma. A lead-lead collision might produce several 10 00 new particles. Detailed study of the event requires precise measurements of the particle tracks. A 90 m3 Time Projection Chamber (TPC) with more than 500 000 read-out pads was built as the main central barrel tracker. Collisions can be recorded at a rate of up to about 1 kHz. The front-end electronics, designed from FPGAs and custom ASICs, performs shaping, amplification, digitisation and digital filtering of the signals. The data are forwarded to DAQ via 216 1.25 Gb/s fibre-optical links. Configuration, control and monitoring is done by an embedded Linux system on the front-end electronics. Before production runs with beam, extensive commissioning using tracks from cosmics and from the laser system as well as clusters from radioactive krypton gas is needed. Extensive results have been obtained with respect to the performance of the TPC including its sub-systems.

  11. National Knowledge Commission

    NASA Astrophysics Data System (ADS)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  12. Commissioning the SNO+ Detector

    NASA Astrophysics Data System (ADS)

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  13. LIGO Detector Commissioning

    NASA Astrophysics Data System (ADS)

    Raab, Frederick

    2003-04-01

    The initial LIGO interferometer design was based on more than 20 years of experience with test interferometers, but the increase in scale, new operating environments and extreme technical requirements presented challenges for commissioning. Detector installation began in 1998 with injection optics at Hanford, WA. By 1999, light was resonating in a single 2-km Fabry-Perot arm cavity. Subsequent engineering runs tested stability and analyzed environmental influences, particularly the earth tides and the microseism. By October 2000, the first lock of a kilometer-scale, power recycled Fabry-Perot-Michelson interferometer was obtained, using an automated system to analyze optical signals and reconfigure control loops as the mirrors are drawn into position. The many control loops that minimize length and angle fluctuations of the mirrors relative to the laser light were tuned and noise sources were identified and reduced iteratively as sensitivity improved by several orders of magnitude. Following installation of the last LIGO mirror in 2001, engineering run 7 provided the first triple-coincidence operation of LIGO's interferometers at Hanford and Livingston, LA in early 2002. Clear signals of mirrors recoiling from the Brownian motion of the suspension-wire violin modes first emerged from the noise during science run 1 in September 2002, at approximately the expected amplitude. Detector robustness has steadily improved and uninterrupted locking on a dark fringe for more than a day has been achieved. The support of the US National Science Foundation under Cooperative Agreement No. PHY-0107417 is gratefully acknowledged.

  14. Reflections on the Gordon Commission

    ERIC Educational Resources Information Center

    Haertel, Edward

    2014-01-01

    Background:This brief reflection on the work of the Gordon Commission calls out significant themes and implications found in the various papers authored by the commissioners and other scholars, especially those included in this special issue of Teachers College Record. Purpose: The forward-looking vision of the Gordon Commission is contrasted with…

  15. Vermont Technical Education Commission Report.

    ERIC Educational Resources Information Center

    Vermont State Technical Education Commission, Montpelier.

    A 1968 New England Regional Commission grant to the Vermont Department of Administration financed a feasibility study for a technical college at the postsecondary level. The commission undertook two specific studies: an examination of ultimate career destinations of Vermont secondary students and a survey of Vermont industry to determine immediate…

  16. Das Zwillingsparadoxon: Gedankenexperimente

    NASA Astrophysics Data System (ADS)

    Genz, Henning

    2002-09-01

    Das vermeintliche Zwillingsparadoxon ist ein Gedankenexperiment mit einem Zwillingspaar: Ein Zwilling reist mit hoher Geschwindigkeit von der Erde weg und kehrt nach einiger Zeit zurück, sein Partner bleibt auf der Erde. Dabei altert der Reisende langsamer als der Ruhende - warum nicht umgekehrt? Ein Vergleich von Uhren, die sich mit konstanter Geschwindigkeit bewegen, zeigt: Der Effekt hängt nur von Geschwindigkeiten und nicht von Beschleunigungen ab. Er beruht also allein auf der Speziellen Relativitätstheorie. Tauschen die Zwillinge in regelmäßigen Abständen Lichtsignale aus, können sie ihr asymmetrisches Altern sogar in Zeitschritten mitprotokollieren.

  17. Das Allgemeine Statistische Archiv

    NASA Astrophysics Data System (ADS)

    Rinne, Horst

    Das Allgemeine Statistische Archiv1, nachfolgend kurz Archiv genannt, ist die älteste, ausschließlich der Statistik gewidmete deutschsprachige wissenschaftliche Fachzeitschrift. Sie ist gut zwanzig Jahre älter als die Deutsche Statistische Gesellschaft, zu deren Publikationsorgan sie mit der Gründung der Gesellschaft im Jahre 1911 wurde. Zeitschrift und Gesellschaft blicken auf eine sehr wechselvolle, aber erfolgreiche gemeinsame Geschichte zurück. Die wissenschaftliche Arbeit der Gesellschaft ist im Archiv und seinen Sonderheften für nachfolgende Generationen dokumentiert.

  18. Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  19. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within the...

  20. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by the...

  1. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by the...

  2. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within the...

  3. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by the...

  4. 11 CFR 9002.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9002.3 Section 9002.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING DEFINITIONS § 9002.3 Commission. Commission means the Federal Election Commission, 999 E Street, NW...

  5. 11 CFR 9032.3 - Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Commission. 9032.3 Section 9032.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND DEFINITIONS § 9032.3 Commission. Commission means the Federal Election Commission, 999 E Street NW...

  6. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Commission. 0.1 Section 0.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization General § 0.1 The Commission. The Federal Communications Commission is composed of five (5) members who are appointed by the...

  7. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false The Commission. 375.101... OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within the...

  8. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Section 375.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION General Provisions § 375.101 The Commission. (a) Establishment. The Federal Energy Regulatory Commission is an independent regulatory commission within the...

  9. 78 FR 32295 - Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... presentations on the following items: (1) Presentation on upgrades to the Commission's Susquehanna Early Warning System program; (2) election of officers for FY-2014; (3) the proposed Water Resources Program; (4...

  10. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  11. NSF commission holds first meeting

    NASA Astrophysics Data System (ADS)

    Jones, Richard M.

    There has been considerable discussion in Washington science policy circles over the past few weeks about the newly established National Science Board Commission on the Future of the National Science Foundation. The commission, chaired by William Danforth, chancellor of Washington University, and Robert Galvin, former chief executive officer of Motorola, held its first meeting on September 17. Unfortunately, this meeting offered few indications of what changes might result from this exercise.

  12. Commission 16: Physical Study of Planets & Satellites

    NASA Astrophysics Data System (ADS)

    McGrath, Melissa A.; Lemmon, Mark T.; Courtin, Regis; Lara, Luisa M.; Kim, Sang Joon; Ksanfomality, Leonid V.; Morrison, David; Tejfel, Viktor G.; Yanamandra-Fisher, Padma A.

    2010-05-01

    The Business Meeting of IAU Commission 16 was held at the General Assembly in Rio de Janeiro on August 13, 2009. The meeting was called to order at 9:15am by Commission President, Régis Courtin, with 12 members present. Commission 16 now has 312 members, up from 271 at the last General Assembly. It is now the third largest Commission in Division III, after Commission 15 and Commission 51.

  13. Connecting the Dots in DAS

    ERIC Educational Resources Information Center

    Ford, Tracy

    2012-01-01

    Many institutions implement a distributed antenna system (DAS) as part of a holistic approach to providing better wireless coverage and capacity on campus. A DAS provides wireless service within a particular area or structure via a network of separate antenna nodes that are connected to a common source through fiber or coaxial cable. Because DAS…

  14. Connecting the Dots in DAS

    ERIC Educational Resources Information Center

    Ford, Tracy

    2012-01-01

    Many institutions implement a distributed antenna system (DAS) as part of a holistic approach to providing better wireless coverage and capacity on campus. A DAS provides wireless service within a particular area or structure via a network of separate antenna nodes that are connected to a common source through fiber or coaxial cable. Because DAS…

  15. Commission 41: History of Astronomy

    NASA Astrophysics Data System (ADS)

    Gurshtein, Alexander A.; Nha, Il-Seong; Ruggles, Clive L. N.; DeVorkin, David H.; Dick, Wolfgang R.; Kochhar, Rajesh; Nakamura, Tsuko; Pigatto, Luisa; Stephenson, F. Richard; Warner, Brian

    2007-12-01

    On Tuesday 22 August 2006 approximately 40 people attended the Commission 41 History of Astronomy Business Meeting at the IAU XXVI General Assembly in Prague. Commission president Alex Gurshtein opened the meeting, welcoming the commission members and calling for a moment of silence for those members who passed away in the last triennium. David DeVorkin was appointed recording secretary for the meeting, with Steven Dick as the scruitineer of the ballot. A moment of silence was then observed in the memory of members departed over the last triennium, including: Jerzy Dobrzycki (Poland), Robert Duncan (Australia), Mohammad Edalati (Iran), Philip Morrison (USA), John Perdix (Australia), Neil Porter (Ireland), Gibson Reaves (USA), Brian Robinson (Australia), and Raymond E. White (USA).

  16. Commission 41: History of Astronomy

    NASA Astrophysics Data System (ADS)

    Ruggles, Clive; Kochhar, Rajesh; Il-Seong, Nha; Belmonte, Juan; Corbin, Brenda; de Jong, Teije; Norris, Ray; Pigatto, Luisa; Soma, Mitsuru; Sterken, Chris; Xiaochun, Sun

    2012-04-01

    Commission 41 was created at the VIIth IAU General Assembly in Zürich in 1948. From an inauspicious start-Otto Neugebauer was appointed the first President in his absence, but proceeded to express his conviction that ``an international organization in the history of astronomy has no positive function. . .my only activity during my term of service consisted in iterated attempts to resign''-the Commission quickly assumed a key role in the international development of the history of astronomy as an academic discipline.

  17. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the...

  18. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 1 2011-04-01 2011-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same political...

  19. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 2 2014-04-01 2014-04-01 false The Commission. 140.10 Section...) ORGANIZATION, FUNCTIONS, AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same...

  20. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same political...

  1. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same political...

  2. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915...

  3. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the...

  4. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915...

  5. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters § 1.11 The Commission. (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the...

  6. 17 CFR 140.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false The Commission. 140.10 Section..., AND PROCEDURES OF THE COMMISSION Functions § 140.10 The Commission. The Commission is composed of a Chairman and four other Commissioners, not more than three of whom may be members of the same political...

  7. 16 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false The Commission. 0.1 Section 0.1 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.1 The Commission. The Federal Trade Commission is an independent administrative agency which was organized in 1915...

  8. 16 CFR 4.15 - Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Commission meetings. 4.15 Section 4.15... RULES § 4.15 Commission meetings. (a) In general. (1) Meetings of the Commission, as defined in 5 U.S.C... announcements of meetings. For each meeting, the Commission shall announce: (i) The time, place and subject...

  9. Federal Communications Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... Part XVIII Federal Communications Commission Semiannual Regulatory Agenda ] FEDERAL COMMUNICATIONS COMMISSION (FCC) FEDERAL COMMUNICATIONS COMMISSION 47 CFR Ch. I Unified Agenda of Federal Regulatory and Deregulatory Actions AGENCY: Federal Communications Commission. ACTION: Semiannual regulatory agenda. SUMMARY: Twice a year, in spring and fall...

  10. 10 CFR 110.91 - Commission consultations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission consultations. 110.91 Section 110.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Public Participation Procedures Concerning License Applications § 110.91 Commission consultations. The Commission...

  11. Houston READ Commission Success Stories.

    ERIC Educational Resources Information Center

    Houston READ Commission, TX.

    This document highlights some of the success stories resulting from the activities of the Houston READ Commission (HRC), a nonprofit urban literacy coalition created by the Mayor and City Council of the Greater Houston area. It relates the stories of "those who are the future," lists gifts which support HRC programs, and donors and…

  12. Commission 12: Solar Radiation & Structure

    NASA Astrophysics Data System (ADS)

    Bogdan, Thomas. J.; Martínez Pillet, Valentin; Asplund, M.; Christensen-Dalsgaard, J.; Cauzzi, G.; Cram, L. E.; Dravins, D.; Gan, W.; Henzl, P.; Kosovichev, A.; Mariska, J. T.; Rovira, M. G.; Venkatakrishnan, P.

    2007-03-01

    Commission 12 covers research on the internal structure and dynamics of the Sun, the "quiet" solar atmosphere, solar radiation and its variability, and the nature of relatively stable magnetic structures like sunspots, faculae and the magnetic network. There is considerable productive overlap with the other Commissions of Division II as investigations move progressively toward the fertile intellectual boundaries between traditional research disciplines. In large part, the solar magnetic field provides the linkage that connects these diverse themes. The same magnetic field that produces the more subtle variations of solar structure and radiative output over the 11 yr activity cycle is also implicated in rapid and often violent phenomena such as flares, coronal mass ejections, prominence eruptions, and episodes of sporadic magnetic reconnection.The last three years have again brought significant progress in nearly all the research endeavors touched upon by the interests of Commission 12. The underlying causes for this success remain the same: sustained advances in computing capabilities coupled with diverse observations with increasing levels of spatial, temporal and spectral resolution. It is all but impossible to deal with these many advances here in anything except a cursory and selective fashion. Thankfully, the Living Reviews in Solar Physics; has published several extensive reviews over the last two years that deal explicitly with issues relevant to the purview of Commission 12. The reader who is eager for a deeper and more complete understanding of some of these advances is directed to http://www.livingreviews.org for access to these articles.

  13. Ham Video Commissioning in Columbus

    NASA Image and Video Library

    2014-04-13

    Documentation of the Ham Video unit installed in the Columbus European Laboratory. Part number (P/N) is HAM-11000-0F, serial number (S/N) is 01, barcode is HAMV0001E. Image was taken during Expedition 39 Ham Video commissioning activities and released by astronaut on Twitter.

  14. Commissioning of the LCLS LINAC

    SciTech Connect

    Loos, H.; Akre, R.; Brachmann, A.; Decker, F.-J.; Ding, Y.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Huang, Z.; Iverson, R.; Limborg-Deprey, C.; Miahnahri, A.; Molloy, S.; Nuhn, H.-D.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC /Stanford U., Appl. Phys. Dept.

    2010-06-11

    The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

  15. Surrogacy commissioning fathers and HIV.

    PubMed

    Jordaan, Donrich W

    2013-10-11

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have been tested for HIV; that he has consented to his HIV status being made available to the surrogate mother, and if he is HIV-positive, that sperm washing will be used to minimise the risk of infection and that the surrogate mother has been informed of his HIV status, and given her informed consent. 

  16. Population commission discusses international migration.

    PubMed

    1997-01-01

    At the 30th session of the Commission on Population and Development during February 24-28, 1997, international migration was the main topic, with special linkages between migration and development and on gender issues and the family. New and emerging issues were also considered. Members stressed the need for more reliable data on migration, the direction of migrants flows, and the characteristics of migrants. The Commission requested a task force on basic social services to hold a technical symposium of experts on international migration in 1998. Its chair, Dr. Nafis Sadik, said that migration issues should based on the reality of choice not on coercive measures or quotas. Almost half of the migrants globally are women. The Commission was given a new impetus by the International Conference on Population and Development held at Cairo in 1994. Migration pressures intensified in the second half of the 1980s and in the early 1990s, creating areas of concern: the negative impact of short-term migration on working conditions in host countries; migration pressures emanating from climatic change; the protection of migrant women and their children; the right of receiving countries to regulate access to their territory; the adverse consequences of forced migration; the situation of persons whose asylum claims have been rejected; the trafficking in women and children, prostitution and coercive adoption; and the sudden and massive arrival of refugees in need of international protection. The 1998 session of the Commission will feature the theme of health and mortality, with special emphasis on the linkages between health and development and on gender and age.

  17. 78 FR 57818 - Commission Participation and Commission Employee Involvement in Voluntary Standards Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... From the Federal Register Online via the Government Publishing Office CONSUMER PRODUCT SAFETY... Standards Activities AGENCY: Consumer Product Safety Commission. ACTION: Notice of proposed rulemaking. SUMMARY: The United States Consumer Product Safety Commission (Commission or CPSC) is issuing a...

  18. 47 CFR 0.1 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Commission. The Federal Communications Commission is composed of five (5) members who are appointed by the president subject to confirmation by the Senate. Normally, one Commissioner is appointed or reappointed each...

  19. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  20. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema

    Paul Saueressig

    2016-07-12

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  1. Bioethics commission to review gene patenting

    SciTech Connect

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  2. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  3. MyDas, an extensible Java DAS server.

    PubMed

    Salazar, Gustavo A; García, Leyla J; Jones, Philip; Jimenez, Rafael C; Quinn, Antony F; Jenkinson, Andrew M; Mulder, Nicola; Martin, Maria; Hunter, Sarah; Hermjakob, Henning

    2012-01-01

    A large number of diverse, complex, and distributed data resources are currently available in the Bioinformatics domain. The pace of discovery and the diversity of information means that centralised reference databases like UniProt and Ensembl cannot integrate all potentially relevant information sources. From a user perspective however, centralised access to all relevant information concerning a specific query is essential. The Distributed Annotation System (DAS) defines a communication protocol to exchange annotations on genomic and protein sequences; this standardisation enables clients to retrieve data from a myriad of sources, thus offering centralised access to end-users.We introduce MyDas, a web server that facilitates the publishing of biological annotations according to the DAS specification. It deals with the common functionality requirements of making data available, while also providing an extension mechanism in order to implement the specifics of data store interaction. MyDas allows the user to define where the required information is located along with its structure, and is then responsible for the communication protocol details.

  4. Commissions, Reports, Reforms, and Educational Policy.

    ERIC Educational Resources Information Center

    Ginsberg, Rick, Ed.; Plank, David N., Ed.

    "Blue-ribbon" commissions are an increasingly common feature of the American political landscape. This book examines the roles that blue-ribbon commissions and their reports have played in educational policymaking. The book begins with a foreword by Paul E. Peterson and an introductory chapter, "Commissions and Change" by Rick Ginsberg and David…

  5. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be members of the same political party. The members are appointed by the President, with the advice and consent...

  6. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be members of the same political party. The members are appointed by the President, with the advice and consent...

  7. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86 Stat...

  8. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be members of the same political party. The members are appointed by the President, with the advice and consent...

  9. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or her...

  10. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86 Stat...

  11. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or her...

  12. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86 Stat...

  13. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be members of the same political party. The members are appointed by the President, with the advice and consent...

  14. 78 FR 44927 - 101st Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... From the Federal Register Online via the Government Publishing Office ARCTIC RESEARCH COMMISSION 101st Commission Meeting Notice is hereby given that the U.S. Arctic Research Commission will hold its... presentations concerning Arctic research activities The focus of the meeting will be Arctic research activities...

  15. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  16. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  17. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  18. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  19. 32 CFR 9.4 - Commission personnel.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Commission personnel. 9.4 Section 9.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM §...

  20. 77 FR 10004 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... MANAGEMENT CFC-50 Commission AGENCY: Office of Personnel Management. ACTION: Establishment of advisory committee. SUMMARY: The CFC-50 Advisory Commission will hold its third and final meeting on March 2, 2012... Federal Campaign (CFC) to ensure its continued growth and success. The Commission is an advisory committee...

  1. 46 CFR 502.161 - Commission's files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Commission's files. 502.161 Section 502.161 Shipping...; Presiding Officers; Evidence § 502.161 Commission's files. Where any matter contained in a tariff, report, or other document on file with the Commission is offered in evidence, such document need not...

  2. 10 CFR 9.105 - Commission procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations § 9.105 Commission procedures... each Commission meeting a portion or portions of which are proposed to be closed to the public pursuant... proposed to be closed to the public, or with respect to any information concerning such series of meetings...

  3. 10 CFR 9.105 - Commission procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations § 9.105 Commission procedures... each Commission meeting a portion or portions of which are proposed to be closed to the public pursuant... proposed to be closed to the public, or with respect to any information concerning such series of meetings...

  4. 10 CFR 9.105 - Commission procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations § 9.105 Commission procedures... each Commission meeting a portion or portions of which are proposed to be closed to the public pursuant... proposed to be closed to the public, or with respect to any information concerning such series of meetings...

  5. 10 CFR 9.105 - Commission procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION PUBLIC RECORDS Government in the Sunshine Act Regulations § 9.105 Commission procedures... each Commission meeting a portion or portions of which are proposed to be closed to the public pursuant... proposed to be closed to the public, or with respect to any information concerning such series of meetings...

  6. 77 FR 39560 - International Joint Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... International Joint Commission International Joint Commission Invites Public Comment on Upper Great Lakes Report The International Joint Commission (IJC) announced today that it is inviting public comment on the final report of its International Upper Great Lakes Study Board, Lake Superior Regulation:...

  7. 75 FR 18469 - April 2010 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ...; ] EXECUTIVE OFFICE OF THE PRESIDENT National Commission on Fiscal Responsibility and Reform April 2010...), the National Commission on Fiscal Responsibility and Reform announces the following meeting: Name: National Commission on Fiscal Responsibility and Reform April 2010 Meeting. Time and Date: Tuesday,...

  8. 17 CFR 200.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false The Commission. 200.10 Section... The Commission. The Commission is composed of five members, not more than three of whom may be members of the same political party. The members are appointed by the President, with the advice and consent...

  9. 45 CFR 2101.10 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false The Commission. 2101.10 Section 2101.10 Public... ORGANIZATION General Organization § 2101.10 The Commission. The Commission is composed of seven members, each of whom is appointed by the President and serves for a period of four years or until his or her...

  10. 16 CFR 1000.1 - The Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false The Commission. 1000.1 Section 1000.1....1 The Commission. (a) The Consumer Product Safety Commission is an independent regulatory agency formed on May 14, 1973, under the provisions of the Consumer Product Safety Act (Pub. L. 92-573, 86 Stat...

  11. Iowa College Student Aid Commission Case Study

    ERIC Educational Resources Information Center

    Leigh, Rachel A.

    2007-01-01

    The purpose of this descriptive case study was to trace the policy production process of a state agency, the Iowa College Student Aid Commission (Commission), to its function today. This case study relied on a review of federal and state statutes, a news article search, biennium reports of the Commission, and information obtained from the…

  12. 46 CFR 502.161 - Commission's files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 9 2013-10-01 2013-10-01 false Commission's files. 502.161 Section 502.161 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS RULES OF PRACTICE AND PROCEDURE Hearings; Presiding Officers; Evidence § 502.161 Commission's files. Where any matter contained in a tariff, report...

  13. 29 CFR 1626.15 - Commission enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Commission enforcement. 1626.15 Section 1626.15 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES-AGE DISCRIMINATION IN EMPLOYMENT ACT § 1626.15 Commission enforcement. (a) As provided in sections 9, 11, 16 and 17 of the Fair Labor Standards Act of 1938, as...

  14. Commissions, Reports, Reforms, and Educational Policy.

    ERIC Educational Resources Information Center

    Ginsberg, Rick, Ed.; Plank, David N., Ed.

    "Blue-ribbon" commissions are an increasingly common feature of the American political landscape. This book examines the roles that blue-ribbon commissions and their reports have played in educational policymaking. The book begins with a foreword by Paul E. Peterson and an introductory chapter, "Commissions and Change" by Rick Ginsberg and David…

  15. 43 CFR 10010.41 - Commission responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... environmental document may be prepared by the Commission, a joint-lead agency, a contractor selected or approved... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Commission responsibility. 10010.41... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR IMPLEMENTING THE NATIONAL...

  16. Commissioning services and Primary Health Networks.

    PubMed

    Booth, Mark; Boxall, Anne-Marie

    2016-01-01

    Commissioning is set to become a stronger feature in the Australian health system as Primary Health Networks embrace it as a tool for improving population health outcomes. International experience shows that developing into a commissioning organisation is not always easy. Drawing on international experiences of commissioning, as well as those from the Australian hospital sector, will help smooth the path for Primary Health Networks.

  17. 17 CFR 201.57 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  18. 39 CFR 3060.42 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Commission review. 3060.42 Section 3060.42 Postal... COMPETITIVE PRODUCTS ENTERPRISE § 3060.42 Commission review. (a) Interested persons shall be provided an... documentation. (b) The Commission will review the calculation of the assumed Federal income tax submitted...

  19. 16 CFR 1101.51 - Commission interpretation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Commission interpretation. 1101.51 Section 1101.51 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INFORMATION DISCLOSURE UNDER SECTION 6(b) OF THE CONSUMER PRODUCT SAFETY ACT Retraction § 1101.51 Commission interpretation. (a)...

  20. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR... for Hearings on License Transfer Applications § 2.1331 Commission action. (a) Upon completion of a hearing, the Commission will issue a written opinion including its decision on the license transfer...

  1. 76 FR 55424 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... MANAGEMENT CFC-50 Commission AGENCY: Office of Personnel Management. ACTION: Establishment of advisory committee. SUMMARY: The U.S. Office of Personnel Management announces the establishment of the CFC-50 Advisory Commission. The Commission shall advise the Director of the U.S. Office of Personnel...

  2. Federal Communications Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... [The Regulatory Plan and Unified Agenda of Federal Regulatory and Deregulatory Actions] Part XIX Federal Communications Commission Semiannual Regulatory Agenda ] FEDERAL COMMUNICATIONS COMMISSION (FCC) FEDERAL COMMUNICATIONS COMMISSION 47 CFR Ch. I Unified Agenda of Federal Regulatory and Deregulatory Actions-Fall 2010 AGENCY: Federal...

  3. Commissioning Instrument for the GTC

    NASA Astrophysics Data System (ADS)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  4. Photometric commissioning results from MINERVA

    NASA Astrophysics Data System (ADS)

    Eastman, Jason D.; Swift, Jonathan; Beatty, Thomas G.; Bottom, Michael; Johnson, John; Wright, Jason; McCrady, Nate; Wittenmyer, Robert A.; Riddle, Reed L.; Plavchan, Peter; Muirhead, Philip Steven; Blake, Cullen; Zhao, Ming

    2015-01-01

    MINERVA is a robotic observatory with four 0.7 meter telescopes at Mt. Hopkins, Arizona, dedicated to precise photometry and radial velocity observations of bright, nearby stars for the discovery and characterization of small exoplanets. Here we present the first photometric results from MINERVA during commissioning at our test facility in Pasadena, California, demonstrating sub-millimag precision on 3-5 minute timescales over several hours. These results show that MINERVA is well-equipped to address its secondary science goal of searching for transits of known and newly discovered super-Earth exoplanets detected by radial velocity, including potential detections from the MINERVA spectrograph.

  5. Division J Commission 28: Galaxies

    NASA Astrophysics Data System (ADS)

    Gallagher, John S.; Davies, Roger L.; Courteau, Stéphane; Dekel, Avishai; Franx, Marijn; Jog, Chanda J.; Jogee, Sardha; Nakai, Naomasa; Rubio, Monica; Tacconi, Linda; Terlevich, Elena

    2016-04-01

    IAU Commission 28 (IAU C28: Galaxies) was founded in the late 1930s at which time it had only a small membership (see the historical notes by Sadler et al. 2007). When C28 ended its existence in 2015 there were well over 1000 members on its books. The membership had grown to the point where the effort to keep track of active participants had become a major task. During the C28s tenure 27 IAU Symposia have been devoted to galaxies, the third highest number (Mickaelian 2014)

  6. Spectroscopic commissioning results from MINERVA

    NASA Astrophysics Data System (ADS)

    Eastman, Jason D.; Johnson, Samson; Wang, Sharon; Sliski, David; Wilson, Maurice; Johnson, John A.; McCrady, Nate; Wittenmyer, Robert A.; Wright, Jason; Plavchan, Peter; Blake, Cullen; Beatty, Thomas G.

    2017-01-01

    MINERVA is a robotic observatory with four 0.7 meter telescopes at Mt. Hopkins, Arizona, dedicated to precise photometry and radial velocity observations of bright, nearby stars for the discovery and characterization of small exoplanets. Here we present the first radial velocity results from MINERVA during commissioning at the Fred Lawrence Whipple Observatory in Arizona, demonstrating m/s precision over month-long timescales. These results show that MINERVA is capable of achieving its primary science goal of finding super-Earths around the nearest, brightest stars.

  7. Beyond Commissioning: The Role of Automation

    SciTech Connect

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  8. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the...

  9. 47 CFR 51.803 - Procedures for Commission notification of a state commission's failure to act.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the state commission and the other parties to the proceeding or matter for which preemption is sought... commission and the parties to a proceeding or matter in which the Commission has taken notice of the state... determining whether it is required to preempt the state commission's jurisdiction of a proceeding or matter...

  10. Division A Commission 31: Time

    NASA Astrophysics Data System (ADS)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  11. Automated Demand Response and Commissioning

    SciTech Connect

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  12. Orion: a commissioned user facility

    NASA Astrophysics Data System (ADS)

    Treadwell, P. A.; Allan, P.; Cann, N.; Danson, C.; Duffield, S.; Elsmere, S.; Edwards, R.; Egan, D.; Girling, M.; Gumbrell, E.; Harvey, E.; Hill, M.; Hillier, D.; Hoarty, D.; Hobbs, L.; Hopps, N.; Hussey, D.; Oades, K.; James, S.; Norman, M.; Palmer, J.; Parker, S.; Winter, D.; Bett, T.

    2013-05-01

    The Orion Laser Facility at AWE in the UK consists of ten nanosecond beamlines and two sub-picosecond beamlines. The nanosecond beamlines each nominally deliver 500 J at 351 nm in a 1 ns square temporal profile, but can also deliver a user-definable temporal profile with durations between 0.1 ns and 5 ns. The sub-picosecond beamlines each nominally deliver 500 J at 1053 nm in a 500 fs pulse, with a peak irradiance of greater than 1021 W/cm2. One of the sub-picosecond beamlines can also be frequency-converted to deliver 100 J at 527 nm in a 500 fs pulse, although this is at half the aperture of the 1053 nm beam. Commissioning of all twelve beamlines has been completed, including the 527 nm sub-picosecond option. An overview of the design of the Orion beamlines will be presented, along with a summary of the commissioning and subsequent performance data. The design of Orion was underwritten by running various computer simulations of the beamlines. Work is now underway to validate these simulations against real system data, with the aim of creating predictive models of beamline performance. These predictive models will enable the user's experimental requirements to be critically assessed ahead of time, and will ultimately be used to determine key system settings and parameters. The facility is now conducting high energy density physics experiments. A capability experiment has already been conducted that demonstrates that Orion can generate plasmas at several million Kelvin and several times solid density. From March 2013 15% of the facility operating time will be given over to external academic users in addition to collaborative experiments with AWE scientists.

  13. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is...

  14. Commissioning Results on the JWST Testbed Telescope

    NASA Technical Reports Server (NTRS)

    Dean, Bruce H.; Acton, D. Scott

    2006-01-01

    The one-meter 18 segment JWST Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate commissioning operations for the JWST Observatory. Eight different commissioning activities were tested on the TBT: telescope focus sweep, segment ID and Search, image array, global alignment, image stacking, coarse phasing, fine phasing, and multi-field phasing. This paper describes recent commissioning results from experiments performed on the TBT.

  15. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  16. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  17. Commission 42: Close Binary Stars

    NASA Astrophysics Data System (ADS)

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2012-04-01

    The present report covers the main developments in the field of close binaries during the triennium 2009-2012. In addition to scientific publications, there have been several opportunities for direct interaction of researchers working on close binaries. A number of meetings focused on more or less specific topics have taken place during this past years but the highlight for Commission 42 is arguably IAU Symposium 282 held in 2011 in Slovakia. The meeting exploited a strong connection in the methodology and tools used by close binary studies and the rapidly advancing field of exoplanet research. After all, exoplanetary systems are mostly discovered and studied using techniques employed by analyses of close binaries for decades. Modelling of exoplanet radial velocity curves and transiting planet light curves are just particular cases of single-lined and eclipsing binary systems, respectively, with very unequal component properties. As shown by IAU Symposium 282, the synergies between the two fields are strong and potentially very useful. Found below is a summary of the main scientific topics and conclusions from this very successful Symposium.

  18. Comparison of the DAS28-CRP and DAS28-ESR in patients with rheumatoid arthritis.

    PubMed

    Sengul, Ilker; Akcay-Yalbuzdag, Seniz; Ince, Bugra; Goksel-Karatepe, Altinay; Kaya, Taciser

    2015-07-01

    To compare the Disease Activity Score with 28 joint (DAS28) using erythrocyte sedimentation rate (ESR) (DAS28-ESR) and DAS28 using C-reactive protein (CRP) (DAS28-CRP) with thresholds validated for DAS28-ESR in Turkish patients with rheumatoid arthritis. The DAS28 data of 112 patients with rheumatoid arthritis followed in a local outpatient clinic were used. First, the correlation between DAS28-CRP and DAS28-ESR and the correlation between their unique components ([0.36 × In (CRP + 1) + 0.96] and [0.70 × In (ESR)]) were analyzed. Second, a Bland-Altman plot was constructed for the evaluation of the level of agreement between DAS28-CRP and DAS28-ESR. Lastly, the agreement between these two methods was analyzed by κ coefficient. Although there was a strong correlation between DAS28-CRP and DAS28-ESR, the correlation between their unique components was fair. Although more than 95% of the point data fall between the upper and lower bounds of the limit of agreement, the percentage error (46%) was higher than the acceptable proportion of 30%. The κ coefficient of agreement between DAS28- ESR and DAS28-CRP with validated thresholds for DAS28-ESR was 0.42, which was close to the lower boundary for moderate agreement. The results of this study demonstrated that there is discordance between DAS28-ESR and DAS28-CRP with the validated thresholds for DAS28-ESR. Using the DAS28-CRP with threshold values validated for DAS28-ESR may lead to errors in the determination of disease activity and therefore may lead to errors in the management of patients with rheumatoid arthritis. © 2015 Asia Pacific League of Associations for Rheumatology and Wiley Publishing Asia Pty Ltd.

  19. Energy Shortage Contingency Plan. (California Energy Commission)

    SciTech Connect

    Not Available

    1994-03-01

    The California Energy Commission's 1993 Energy Shortage Contingency Plan is prepared in response to state legislative requirements. The statute directs the California Energy Commission to prepare and submit to the Governor and Legislature contingency plans to deal with possible shortages of electrical energy or fuel supplies to protect public health, safety and welfare.

  20. Commissioning MMS: Challenges and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  1. The Commission on Rural Colleges: A Beginning.

    ERIC Educational Resources Information Center

    McCoy, William H.

    1979-01-01

    Describes the establishment by the American Association of Community and Junior Colleges of the Task Force on Rural Community Colleges and the subsequent establishment of the more permanent Commission on Rural Colleges. Delineates its membership, activities, and areas which need to be acted upon by the Commission. (MB)

  2. 2005 Base Closure and Realignment Commission Report

    EPA Pesticide Factsheets

    The 2005 Defense Base Closure and Realignment Commission is proud to present its Final Report for your consideration. As required by law, the Commission thoroughly and objectively reviewed the domestic installation closure and realignment recommendations proposed by the Secretary of Defense on May 13, 2005.

  3. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Procedures for Hearings on License Transfer... opinion including its decision on the license transfer application and the reasons for the decision....

  4. 10 CFR 2.1331 - Commission action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Commission action. 2.1331 Section 2.1331 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES OF PRACTICE AND PROCEDURE Procedures for Hearings on License Transfer... opinion including its decision on the license transfer application and the reasons for the decision....

  5. 44 CFR 62.6 - Minimum commissions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADJUSTMENT OF CLAIMS Issuance of Policies § 62.6 Minimum commissions. (a) The earned commission which shall be paid to any property or casualty insurance agent or broker duly licensed by a state insurance regulatory authority, with respect to each policy or renewal the agent duly procures on behalf of the...

  6. MCCONE COMMISSION EDUCATION RECOMMENDATIONS. PROGRESS REPORT.

    ERIC Educational Resources Information Center

    MARTYN, KENNETH A.

    THIS FOLLOWUP STUDY EXAMINES THE PROGRESS OF THE LOS ANGELES CITY AND COUNTY SCHOOLS IN IMPLEMENTING THE EDUCATIONAL RECOMMENDATIONS IN THE REPORT OF THE MCCONE COMMISSION, THE GOVERNOR'S COMMISSION ON THE LOS ANGELES RIOTS. IT PRESENTS DATA, SUPPLIED BY THE ADMINISTRATIVE STAFF OF THE SCHOOL DISTRICTS, ON DOUBLE SESSIONS AND UNUSED CLASSROOMS,…

  7. 38 CFR 13.64 - Fiduciary commissions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Fiduciary commissions. 13.64 Section 13.64 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS VETERANS BENEFITS ADMINISTRATION, FIDUCIARY ACTIVITIES § 13.64 Fiduciary commissions. Generally, a VA appointed...

  8. 38 CFR 13.64 - Fiduciary commissions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2014-07-01 2014-07-01 false Fiduciary commissions. 13.64 Section 13.64 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS VETERANS BENEFITS ADMINISTRATION, FIDUCIARY ACTIVITIES § 13.64 Fiduciary commissions. Generally, a VA appointed...

  9. Wyoming Community College Commission Annual Report, 2010

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2010

    2010-01-01

    The Wyoming Community College Commission (WCCC) serves the system of Wyoming's seven community colleges. Wyoming's seven community colleges provide affordable, accessible and lifelong education. The Wyoming Community College Commission supports the colleges through advocacy, coordination and collaboration. In partnership with the colleges, the…

  10. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with... Commission will order that BPA amend the ASC to conform with the methodology. If the ASC is in accord with... by the Commission will be at the rate charged to BPA by the U.S. Treasury during that period,...

  11. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with... Commission will order that BPA amend the ASC to conform with the methodology. If the ASC is in accord with... by the Commission will be at the rate charged to BPA by the U.S. Treasury during that period,...

  12. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with... Commission will order that BPA amend the ASC to conform with the methodology. If the ASC is in accord with... by the Commission will be at the rate charged to BPA by the U.S. Treasury during that period,...

  13. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with... Commission will order that BPA amend the ASC to conform with the methodology. If the ASC is in accord with... by the Commission will be at the rate charged to BPA by the U.S. Treasury during that period,...

  14. 18 CFR 35.31 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determine whether the ASC set by BPA for the applicable exchange period was determined in accordance with... Commission will order that BPA amend the ASC to conform with the methodology. If the ASC is in accord with... by the Commission will be at the rate charged to BPA by the U.S. Treasury during that period,...

  15. 18 CFR 375.101 - The Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Commission is at 888 First Street, NE., Washington, DC 20426. Regional offices are maintained at Atlanta, GA... the United States. The time and place of meetings of the Commission are announced in advance as... members or by such agents as it may designate, conduct any hearing, or other inquiry necessary...

  16. Alaska Women's Commission Regional Conferences 1986.

    ERIC Educational Resources Information Center

    Callahan, Christine

    This booklet describes the work of the Alaska Women's Commission, a state agency dedicated to the achievement of equal legal, economic, social, and political status for women in Alaska. Since its inception, the Alaska Women's Commission has provided funding for regional women's conferences in rural parts of the state. The document describes four…

  17. Commission on Preservation and Access Newsletter, 1995.

    ERIC Educational Resources Information Center

    Commission on Preservation and Access Newsletter, 1995

    1995-01-01

    The Commission on Preservation and Access was established to foster and support collaboration among libraries and allied organizations in order to ensure the preservation of the published and documentary records in all formats and to provide enhanced access to scholarly information. The Commission's newsletter keeps preservation and access…

  18. CCRIS: Carnegie Commission Reports Information System.

    ERIC Educational Resources Information Center

    Lavin, Mary Jo

    The Carnegie Commission Reports Information System (CCRIS) attempts to make the findings of the 22 Commission reports (published by McGraw Hill Book Company) more readily available to the academic community. CCRIS consists of an explanatory text of 16 pages introducing the reader to a set of 1500 edge-notched McBee cards. Each card contains a…

  19. The Civil Rights Commission Must Persist

    ERIC Educational Resources Information Center

    Reynolds, Gerald A.

    2007-01-01

    Columnist George Will and others have questioned the continuing need for a federal civil rights commission, because civil rights protections have been on the books since 1964. The chairman of the Commission, Gerald Reynolds, here responds that practitioners of critical legal theory, advocates of the Akaka-Secession bill, some proponents of…

  20. Commission on Preservation and Access Newsletter, 1996.

    ERIC Educational Resources Information Center

    Commission on Preservation and Access Newsletter, 1996

    1996-01-01

    The Commission on Preservation and Access was established to foster and support collaboration among libraries and allied organizations in order to ensure the preservation of the published and documentary record in all formats and to provide enhanced access to scholarly information. The Commission's newsletter keeps preservation and access…

  1. 16 CFR 1101.51 - Commission interpretation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Commission interpretation. 1101.51 Section 1101.51 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INFORMATION DISCLOSURE UNDER SECTION 6(b) OF THE CONSUMER PRODUCT SAFETY ACT Retraction § 1101.51...

  2. 76 FR 53159 - CFC-50 Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ..., 2011, at the time and location shown below. The Commission shall advise the Director of the U.S. Office... committee composed of Federal employees, private campaign administrators, charitable organizations and... to present material to the Commission at the meeting. The manner and time prescribed for...

  3. Alaska Women's Commission Regional Conferences 1986.

    ERIC Educational Resources Information Center

    Callahan, Christine

    This booklet describes the work of the Alaska Women's Commission, a state agency dedicated to the achievement of equal legal, economic, social, and political status for women in Alaska. Since its inception, the Alaska Women's Commission has provided funding for regional women's conferences in rural parts of the state. The document describes four…

  4. 47 CFR 1.1528 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Implementation of the Equal Access to Justice Act (EAJA) in Agency Proceedings Procedures for Considering Applications § 1.1528...

  5. Women Appointed to State Boards and Commissions.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. Center for the American Woman and Politics.

    The report analyzed the average proportions of women on 2,134 state boards and commissions in ten areas of state government. Data were collected in 1975 at the request of the Women in Power Committee of the National Commission on the Observance of International Women's Year. The ten functional areas of government were business regulation, economic…

  6. 29 CFR 1603.304 - Commission decision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EXEMPT STATE AND LOCAL GOVERNMENT EMPLOYEE COMPLAINTS OF EMPLOYMENT DISCRIMINATION UNDER SECTION 304 OF... consideration by the Commission. (b) When an administrative law judge certifies a matter for interlocutory review under § 1603.213, the Commission may, in its discretion, issue a decision on the matter or send...

  7. 76 FR 63325 - National Indian Gaming Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ...--management fee The NOI asked whether the Commission should consider whether the definition of net revenues.... Management Contracts--Collateral Agreements The NOI asked whether the Commission should consider promulgating a regulation requiring the review and approval of collateral agreements to a management contract. A...

  8. Commission 22: Meteors, Meteorites and Interplanetary Dust

    NASA Astrophysics Data System (ADS)

    Spurný, Pavel; Watanabe, Jun-ichi; Mann, Ingrid; Borovička, Jiří; Baggaley, William J.; Brown, Peter G.; Consolmagno, Guy J.; Jenniskens, Peter M. M.; Pellinen-Wannberg, Asta K.; Porubčan, Vladimír; Williams, Iwan P.; Yano, Hajime

    Commission 22 is part of Division III on Planetary System Sciences of the International Astronomical Union. Members of Commission 22 are professional scientists studying bodies in the Solar System smaller than asteroids and comets, and their interactions with planets. The main subjects of interest are meteors, meteoroids, meteoroid streams, interplanetary dust particles, and also zodiacal cloud, meteor trains, meteorites, tektites, etc.

  9. Appalachian Regional Commission Annual Report, 2001.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    In fiscal year 2001, the Appalachian Regional Commission invested $63.6 million in 469 economic and human development (nonhighway) projects and $389.6 million in highway projects in Appalachia. The Commission launched a new initiative to promote the development of telecommunications infrastructure, especially in distressed counties. The Commission…

  10. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR.... (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... for licensing and regulating nuclear facilities and materials and for conducting research in support...

  11. 10 CFR 1.11 - The Commission.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false The Commission. 1.11 Section 1.11 Energy NUCLEAR.... (a) The Nuclear Regulatory Commission, composed of five members, one of whom is designated by the... for licensing and regulating nuclear facilities and materials and for conducting research in support...

  12. The Civil Rights Commission Must Persist

    ERIC Educational Resources Information Center

    Reynolds, Gerald A.

    2007-01-01

    Columnist George Will and others have questioned the continuing need for a federal civil rights commission, because civil rights protections have been on the books since 1964. The chairman of the Commission, Gerald Reynolds, here responds that practitioners of critical legal theory, advocates of the Akaka-Secession bill, some proponents of…

  13. 76 FR 24081 - Notice of Commission Determination

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ..., or Rhinestreet shale formations. DATES: April 21, 2011. ADDRESSES: Susquehanna River Basin Commission... the Antes, Burket, Geneseo, Mandata, Middlesex, Needmore, or Rhinestreet shale formations shall be... Marcellus or Utica shale formations that the Commission has already determined to be subject to review...

  14. Faculty Mentoring: What the Boyer Commission Forgot

    ERIC Educational Resources Information Center

    Wasburn, Mara H.

    2005-01-01

    In 1998, a Carnegie Foundation Commission Report criticized America's 123 research universities for failing our educational system by ignoring undergraduate education. Notably absent from the Commission's list of recommendations was mentoring research university faculty as a strategy to improve their teaching. This article discusses strategic …

  15. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  16. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  17. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  18. 33 CFR 209.50 - Mississippi River Commission: Public observation of Commission meetings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Mississippi River Commission... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.50 Mississippi River... of the Mississippi River Commission and to open all meetings of the Mississippi River Commission...

  19. Commission 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Genova, Françoise; Norris, Raymond P.; Dluzhnevskaya, Olga B.; Bessel, Michael S.; Jenker, H.; Malkov, Oleg Yu.; Murtagh, Fionn; Nakajima, Koichi; Ochsenbein, François; Pence, William D.; Schmitz, Marion; Wielen, Roland; Zhao, Yong Heng

    2007-12-01

    Commission 5 has been very active during the IAU XXVI General Assembly in Prague: the Commission, its Working Groups and its Task Force held business meetings. In addition, Commission 5 sponsored two Special Sessions: Special Session 3 on The Virtual Observatory in Action: New Science, New Technology, and Next Generation Facilities which was held for three days 17 22 August, and Special Session 6 on Astronomical Data Management, which was held on 22 August. Commission 5 also participated in the organisation of Joint Discussion 16 on Nomenclature, Precession and New Models in Fundamental Astronomy, which was held 22-23 August. The General Assembly and Commission 5 web sites provides links to detailed information about all these meetings.

  20. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  1. A Practical Guide for Commissioning Existing Buildings

    SciTech Connect

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  2. Commissioning a museum and archival storage facility

    SciTech Connect

    Ellis, R.T.

    1996-11-01

    The post-construction heating, ventilating, and air-conditioning (HVAC) system commissioning process undertaken at a new 425,000-ft{sup 2} historical museum and archival storage facility is described. The commissioning agent was not brought into the process until construction was complete, the building was occupied, and the HVAC systems were found to be functioning improperly. The author, who served as the third-party commissioning agent, describes the process of identifying the causes of system problems, performing verification tests, correcting problems, and working to re-create a team approach to problem solving following a year of finger-pointing. The paper concludes with a discussion of how involving a commissioning agent throughout the design and construction process, as recommended in ASHRAE`s Guideline 1, Commissioning of HVAC Systems, instead of just for post-construction troubleshooting, would have benefited all parties involved in the project.

  3. Instrumented home energy rating and commissioning

    SciTech Connect

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  4. Nuclear Regulatory Commission: more aggressive leadership needed

    SciTech Connect

    Staats, E.B.

    1980-01-15

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation.

  5. Division G Commission 42: Close Binary Stars

    NASA Astrophysics Data System (ADS)

    Richards, Mercedes T.; Pribulla, Theodor; Ribas, Ignasi; Bradstreet, David H.; Dreschsel, Horst; Maceroni, Carla; Mikolajewska, Joanna; Munari, Ulisse; Prsa, Andrej; Scharfe, Colin; Southworth, John; Trimble, Virginia

    2016-04-01

    Commission 42 began life as Photometric Double Stars in 1948 at the 7th General Assembly in Zurich, under the presidency of Zdenek Kopal. As early as 1961, then General Secretary Lukas Plaut recommended a merger between C42 and C26, Double Stars, one of the original 32 commissions going back to 1919-22 (first president Aitken, assistant director at Lick). C42 became Close Binary Stars in 1970, at the 14th GA in Brighton (the first one I attended). Table 1 shows the presidents of C42, and vice presidents, from when the office started, through the history of the Commission.

  6. Presidential commission investigating Challenger accident at KSC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Views of the Presidential commission investigating the Challenger accident at Kennedy Space Center (KSC). Photos include NASA Astronaut Robert Crippen pointing out Discovery tile work in the Vehicle Assembly Building (28888); KSC Director Richard Smith points out a portion of a solid rocket booster segment to Astronaut Sally Ride and to the chairman of the Presidential Commission, William P. Rogers (28889); Rogers and other members of the Pressidential commission examines the propellent contained in a solid rocket booster segment stored at one of the KSC ordinance facilities (28890).

  7. Presidential commission investigating Challenger accident at KSC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Views of the Presidential commission investigating the Challenger accident at Kennedy Space Center (KSC). Photos include NASA Astronaut Robert Crippen pointing out Discovery tile work in the Vehicle Assembly Building (28888); KSC Director Richard Smith points out a portion of a solid rocket booster segment to Astronaut Sally Ride and to the chairman of the Presidential Commission, William P. Rogers (28889); Rogers and other members of the Pressidential commission examines the propellent contained in a solid rocket booster segment stored at one of the KSC ordinance facilities (28890).

  8. Joint Commission suspends 'auto' adverse decision.

    PubMed

    2010-08-01

    The Joint Commission's revision of its policy on root cause analysis puts greater attention of something that, quite frankly, some ED managers might not have been aware of. The ED manager plays an important role when events occur in the department, such as: knowing who the main Joint Commission contact is in the hospital, and making them aware of a potential adverse or sentinel event that has occurred; participating in the root cause analysis to identify what ED processes might need improvement; making sure the remedial activities recommended can be measured, so The Joint Commission can see an active attempt is being made to improve.

  9. 75 FR 72857 - Notice of Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... From the Federal Register Online via the Government Publishing Office SUSQUEHANNA RIVER BASIN COMMISSION Notice of Public Hearing and Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice of public hearing and Commission meeting. SUMMARY: The Susquehanna River Basin Commission will...

  10. Commissioning medical education: principles for best practice.

    PubMed

    Walsh, Kieran

    2016-04-01

    We need to ensure that we get value for money for our investments in medical education. Commissioning is one method of ensuring that we get value. However, like any other tool, it needs to be used properly.

  11. 77 FR 49441 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-16

    ... performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a...

  12. 76 FR 6774 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a...

  13. 76 FR 55059 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a...

  14. 77 FR 29621 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend...

  15. 10 CFR 110.40 - Commission review.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Canada. (5) An export involving assistance to end uses related to isotope separation, chemical... up to 5 percent in the isotope uranium-235, and those categories of exports which the Commission...

  16. South Carolina Commission on Higher Education

    ERIC Educational Resources Information Center

    South Carolina Commission on Higher Education, 2007

    2007-01-01

    This brochure includes basic checklist information about the South Carolina Commission on Higher Education, its mission and membership, facts on higher education in South Carolina, and a list of state public institutions.

  17. 17 CFR 200.63 - Commission opinions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of the Commission should state the reasons for the action taken and contain a clear showing that no... guided in his decisions by a deep regard for the integrity of the system of law which he administers....

  18. 10 CFR 110.113 - Commission action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... available at the NRC Web site, http://www.nrc.gov, and furnished to the participants. (d) The Commission may... public interest, particularly the common defense and security; and (2) A participant establishing...

  19. Presidential commission investigating Challenger accident at JSC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Views of the Presidential commission investigating the Challenger accident at Johnson Space Center (JSC). Two JSC Officials chat prior to a meeting with members of the Presidential Commission on the Space Shuttle Challenger accident, while one of the commissioners studies his notes. Left to right in the foreground are Richard H. Kohrs, Deputy Manager of the National Space Transportation System (NSTS) program office; JSC Deputy Director Robert C. Goetz and Joseph F. Sutter (28749); Two JSC Officials and two members of the Commission meet in the Executive Conference Room of JSC's Project Management Building. Left to right are Goetz; Kohrs; Sutter and Dr. Arthur B.C. Walker Jr. (28750); More meeting between NASA and the commission. Left to right are Goetz; Kohrs; Walker and Robert W. Rummel and Joseph F. Sutter (28751).

  20. Securities and Exchange Commission Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... adviser from providing advisory services for compensation to a government client for two years after the... Commission proposed amendments to Rule 15c2-11. These amendments would limit the rule's piggyback provision...

  1. Psychosurgery: National Commission Issues Surprisingly Favorable Report

    ERIC Educational Resources Information Center

    Culliton, Barbara J.

    1976-01-01

    Presents results of a national commission's investigation of psychosurgery. Results indicate the procedure to be effective in the cure of patients suffering from pain accompanied by depression, while avoiding the destruction caused by prefrontal lobotomies. (SL)

  2. Psychosurgery: National Commission Issues Surprisingly Favorable Report

    ERIC Educational Resources Information Center

    Culliton, Barbara J.

    1976-01-01

    Presents results of a national commission's investigation of psychosurgery. Results indicate the procedure to be effective in the cure of patients suffering from pain accompanied by depression, while avoiding the destruction caused by prefrontal lobotomies. (SL)

  3. Presidential commission investigating Challenger accident at JSC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Views of the Presidential commission investigating the Challenger accident at Johnson Space Center (JSC). Two JSC Officials chat prior to a meeting with members of the Presidential Commission on the Space Shuttle Challenger accident, while one of the commissioners studies his notes. Left to right in the foreground are Richard H. Kohrs, Deputy Manager of the National Space Transportation System (NSTS) program office; JSC Deputy Director Robert C. Goetz and Joseph F. Sutter (28749); Two JSC Officials and two members of the Commission meet in the Executive Conference Room of JSC's Project Management Building. Left to right are Goetz; Kohrs; Sutter and Dr. Arthur B.C. Walker Jr. (28750); More meeting between NASA and the commission. Left to right are Goetz; Kohrs; Walker and Robert W. Rummel and Joseph F. Sutter (28751).

  4. U.S. Nuclear Regulatory Commission

    MedlinePlus

    ... of Documents Withholding of Sensitive Information Photos & Video Electronic Hearing Docket About NRC The Commission Organization & Functions ... Popular Documents Info Digest Fact Sheets & Brochures Forms Electronic Submittals Application Adjudicatory Submissions NRC Reports – NUREG NRC ...

  5. Division II: Commission 10: Solar Activity

    NASA Astrophysics Data System (ADS)

    van Driel-Gesztelyi, Lidia; Scrijver, Karel J.; Klimchuk, James A.; Charbonneau, Paul; Fletcher, Lyndsay; Hasan, S. Sirajul; Hudson, Hugh S.; Kusano, Kanya; Mandrini, Cristina H.; Peter, Hardi; Vršnak, Bojan; Yan, Yihua

    2015-08-01

    The Business Meeting of Commission 10 was held as part of the Business Meeting of Division II (Sun and Heliosphere), chaired by Valentin Martínez-Pillet, the President of the Division. The President of Commission 10 (C10; Solar activity), Lidia van Driel-Gesztelyi, took the chair for the business meeting of C10. She summarised the activities of C10 over the triennium and the election of the incoming OC.

  6. Building commissioning: The key to quality assurance

    SciTech Connect

    1998-05-01

    This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

  7. Results of the NSLS-II commissioning

    NASA Astrophysics Data System (ADS)

    Wang, Guimei; Shaftan, Timur; Willeke, Ferdinand; NSLS Team, II

    2015-04-01

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad of horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The linac commissioning activities started in March of 2012 and was accomplished in several weeks. In Dec. 2013 the booster commissioning commenced and reached its goal in February 2014. The commissioning of the NSLS-II storage ring was successfully completed in July 2014, taking about two months in total. The storage ring is now operating at 50 mA with 3 sets of Damping Wigglers resulting in 1 nm rad of horizontal emittance. We delivered the first user light on October 23, 2014. At this point six NSLS-II project beamlines are routinely taking photons since November of 2014. In this presentation I review the NSLS-II accelerator design and our experience with getting ready for the machine start-up. In the following I focus on the commissioning results and present details, issues and advances in reaching the commissioning milestones.

  8. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... Energy Regulatory Commission Notice of Commission and Commission Staff Attendance at ISO/RTO Council and... of the Commission and Commission staff may attend the following ISO/RTO Council and Regional State..., RTO/ISO Performance Metrics. For more information, contact Sandra Waldstein, Office of...

  9. 47 CFR 51.801 - Commission action upon a state commission's failure to act to carry out its responsibility under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... matter under section 252 of the Act, the Commission shall issue an order preempting the state commission... Act with respect to the proceeding or matter and shall act for the state commission. (b) For purposes... 47 Telecommunication 3 2013-10-01 2013-10-01 false Commission action upon a state commission's...

  10. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    SciTech Connect

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  11. 75 FR 68823 - National Capital Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...-action items before the Commission: (1) Design consultation--Dwight D. Eisenhower Memorial, and (2... Planning Commission; Chairman, Commission of Fine Arts; Mayor of the District of Columbia; Architect of...

  12. 75 FR 7927 - National Commission on Fiscal Responsibility and Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Commission on Fiscal Responsibility and Reform By the authority vested in me as President by the Constitution... Fiscal Responsibility and Reform (Commission). Sec. 2. Membership. The Commission shall be composed of...

  13. 75 FR 3448 - Federal Advisory Committee; Military Leadership Diversity Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... of the Secretary Federal Advisory Committee; Military Leadership Diversity Commission AGENCY... the Military Leadership Diversity Commission (hereafter referred to as the Commission) on January 15... organizations are reminded that they may submit written statements to the Military Leadership...

  14. 39 CFR 3002.10 - The Commission and its offices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reading room where the Commission's public records are available for inspection and copying; a library... are held on matters before the Commission. The Commission also maintains an electronic reading...

  15. 77 FR 47049 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Commission Information Collection Activities; Comment Request AGENCY: Federal Energy Regulatory Commission. ACTION: Comment request. SUMMARY: In compliance with the...

  16. 47 CFR 0.401 - Location of Commission offices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General.... (i) Documents submitted by mail to this office should be addressed to: Federal Communications... located near Columbia, Maryland. The mailing address is: Federal Communications Commission,...

  17. 47 CFR 0.401 - Location of Commission offices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General.... (i) Documents submitted by mail to this office should be addressed to: Federal Communications... located near Columbia, Maryland. The mailing address is: Federal Communications Commission,...

  18. 47 CFR 0.401 - Location of Commission offices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General.... (i) Documents submitted by mail to this office should be addressed to: Federal Communications... located near Columbia, Maryland. The mailing address is: Federal Communications Commission,...

  19. 47 CFR 0.401 - Location of Commission offices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION General.... (i) Documents submitted by mail to this office should be addressed to: Federal Communications... located near Columbia, Maryland. The mailing address is: Federal Communications Commission,...

  20. Data Acquisition System(DAS) Sustaining Engineering

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This paper presents general information describing the Data Acquisition System contract, a summary of objectives, tasks performed and completed. The hardware deliverables which are comprised of: 1) Two ground DAS units; 2) Two flight DAS units; 3) Logistic spares; and 4) Shipping containers are described. Also included are the data requirements and scope of the contract.

  1. Boys' Reading Commission 2012: A Review of Existing Research Conducted to Underpin the Commission

    ERIC Educational Resources Information Center

    Clark, Christina

    2012-01-01

    The gender gap has been a hotly debated issue, both nationally and internationally. In 2000, the then Department for Education and Schools commissioned a four-year study into raising boys' achievement. The commission worked with over 60 primary, secondary and special schools in England to identify and evaluate the strategies highlighted to be…

  2. National Commission on Excellence in Teacher Education: Commissioned Papers from the Regional Hearings. ERIC Digest.

    ERIC Educational Resources Information Center

    Butler, Catherine

    The National Commission on Excellence in Teacher Education was appointed in 1983 to describe the present state of teacher education, identify problem issues, and make recommendations for the improvement of teacher education. The final report of the Commission, "A Call for Change in Teacher Education," was based on information gathered at…

  3. 75 FR 27981 - Codex Alimentarius Commission: Meeting of the Codex Alimentarius Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... Food Safety and Inspection Service Codex Alimentarius Commission: Meeting of the Codex Alimentarius... Session of the Codex Alimentarius Commission (CAC), which will be held in Geneva, Switzerland, July 5-9... Session of the CAC and About the Public Meeting Contact: Barbara McNiff, U.S. Codex Office,...

  4. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    SciTech Connect

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  5. Division G Commission 45: Stellar Classification

    NASA Astrophysics Data System (ADS)

    Gray, Richard; Soubiran, Caroline; Nordström, Birgitta; Burgasser, Adam; Gupta, Ranjan; Hanson, Margaret; Leggett, Sandy K.; Soubiran, Caroline; Singh, Harinder P.; Nordström, Birgitta

    2016-04-01

    Commission 45 is solidly anchored in the beginnings of the IAU. It evolved out of Commission 29, which was one of the original commissions and whose title and emphasis was the Spectral Classification of Stars (Transactions of the IAU, Volume I, 1922). C29 was formed with W.S. Adams (Pasadena) as president. Its first members were Miss Cannon, R.H. Curtiss, A. Fowler, A. de Gramont, M. Hamy, H.F. Newall, J.S. Plaskett, H.N. Russell, all very much part of the history of stellar spectroscopy. In the 1922 Transactions report it was recognized the Harvard System of spectral classification ``has already been adopted by international agreement. . .''

  6. VINCI: the VLT Interferometer commissioning instrument

    NASA Astrophysics Data System (ADS)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  7. Yale and the Atomic Bomb Casualty Commission.

    PubMed Central

    Bowers, J. Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation. PMID:6349145

  8. Yale and the Atomic Bomb Casualty Commission.

    PubMed

    Bowers, J Z

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation.

  9. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  10. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  11. Commissioning an Elekta Versa HD linear accelerator.

    PubMed

    Narayanasamy, Ganesh; Saenz, Daniel; Cruz, Wilbert; Ha, Chul S; Papanikolaou, Niko; Stathakis, Sotirios

    2016-01-08

    The purpose of this study is to report the dosimetric aspects of commissioning performed on an Elekta Versa HD linear accelerator (linac) with high-dose-rate flattening filter-free (FFF) photon modes and electron modes. Acceptance and commissioning was performed on the Elekta Versa HD linac with five photon energies (6 MV, 10 MV, 18 MV, 6 MV FFF, 10 MV FFF), four electron energies (6 MeV, 9MeV, 12 MeV, 15 MeV) and 160-leaf (5 mm wide) multileaf collimators (MLCs). Mechanical and dosimetric data were measured and evaluated. The measurements include percent depth doses (PDDs), in-plane and cross-plane profiles, head scatter factor (Sc), relative photon output factors (Scp), universal wedge transmission factor, MLC transmission factors, and electron cone factors. Gantry, collimator, and couch isocentricity measurements were within 1 mm, 0.7 mm, and 0.7 mm diameter, respectively. The PDDs of 6 MV FFF and 10 MV FFF beams show deeper dmax and steeper falloff with depth than the corresponding flattened beams. While flatness values of 6 MV FFF and 10 MV FFF normalized profiles were expectedly higher than the corresponding flattened beams, the symmetry values were almost identical. The cross-plane penumbra values were higher than the in-plane penumbra values for all the energies. The MLC transmission values were 0.5%, 0.6%, and 0.6% for 6 MV, 10 MV, and 18 MV photon beams, respectively. The electron PDDs, profiles, and cone factors agree well with the literature. The outcome of radiation treatment is directly related to the accuracy in the dose modeled in the treatment planning system, which is based on the commissioned data. Commissioning data provided us a valuable insight into the dosimetric characteristics of the beam. This set of commissioning data can provide comparison data to others performing Versa HD commissioning, thereby improving patient safety.

  12. Commissioning Simulations for the APS Upgrade Lattice

    SciTech Connect

    Sajaev, V.; Borland, M.

    2015-01-01

    A hybrid seven-bend-achromat lattice that features very strong focusing elements and a relatively small vacuum chamber has been proposed for the APS upgrade. Achieving design lattice parameters during commissioning will need to be accomplished quickly in order to minimize dark time for APS users. The paper will describe start-to-end simulation of the machine commissioning beginning from first-turn trajectory correction, progressing to orbit and lattice correction, and culminating in evaluation of the nonlinear performance of the corrected lattice

  13. Division XII: Commission 6: Astronomical Telegrams

    NASA Astrophysics Data System (ADS)

    Samus, N. N.; Yamaoka, H.; Gilmore, A. C.; Aksnes, K.; Green, D. W. E.; Marsden, B. G.; Nakano, S.; Lara, Martin; Pitjeva, Elena V.; Sphar, T.; Ticha, J.; Williams, G.

    2015-08-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during the Beijing General Assembly of the IAU. It took place on Friday, August 24, 2012. The meeting was attended by five C6 members (N. N. Samus; D. W. E. Green; S. Nakano; J. Ticha; and H. Yamaoka). Also present was Prof. F. Genova as a representative of the IAU Division B. She told the audience about the current restructuring of IAU Commissions and Divisions and consequences for the future of C6.

  14. Update from the Commission on Cancer.

    PubMed

    Clive, R E

    1997-02-01

    A model for an integrated, comprehensive program for high-quality, cost-effective patient care can be found in cancer programs approved by the Commission on Cancer. A key component in assessing the effectiveness of the model is the cancer registry. Changes in the health care delivery system are behind increased demands for and use of cancer registry data. To support this shift and expanded activity, the Commission on Cancer has instituted a series of initiatives. These steps address refinements of the standards for approval, collaborative relationships, performance measurement information, new educational opportunities, and an organized communications campaign.

  15. COMMISSIONING OF RHIC AT 100 GEV / NUCLEON.

    SciTech Connect

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,J.M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; DREES,A.; FLILLER,R.P.; ET AL

    2002-06-02

    This report describes commissioning of the Relativistic Heavy Ion Collider (RHIC) for 100 GeV/nucleon collisions at designed luminosity. To achieve these goals new systems had to be commissioned: Gamma-t transition crossing jump quadrupoles, rebucketing with the new RF storage cavities, phase lock loop feedback, betatron and crystal collimation, beta squeeze along the ramp, Siberian snake magnets for the proton polarization run, AC dipole system chromaticity measurements along the acceleration ramp, orbit correction, new ramp management system, upgraded sequencer, new data instrumentation and logger acquisition system etc.

  16. Security role in today's Joint Commission surveys.

    PubMed

    White, Donald E

    2010-01-01

    The old saying "the more it changes, the more it is the same thing," does not apply to the Joint Commission, which has changed more than it's name, according to the author. In this article, in which he gives detailed first-hand information on today's survey experience, including the pitfalls to be expected, he reports that healthcare security's roles have been expanded. Unannounced inspections now start the previous evening, thanks to surveyor drive-bys. The Life Safety surveyor has replaced the Administrator surveyor on the Joint Commission's inspection team. Two things to be prepared for are detailed questioning about security staff competency and room contents hazards for each room.

  17. 18 CFR 401.89 - Action by the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Action by the Commission. 401.89 Section 401.89 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION... to law. (b) Commission Counsel shall assist the Commission with its review of the hearing record...

  18. 18 CFR 401.89 - Action by the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Action by the Commission. 401.89 Section 401.89 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION... to law. (b) Commission Counsel shall assist the Commission with its review of the hearing record...

  19. 75 FR 52932 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... Area: Tohickon-Deep Run, Tohickon- Geddes-Cabin Runs, Pine Run, and North Branch Neshaminy Creek. 10... Commission Meeting and Public Hearing on the Commission's Web site, drbc.net , ten days prior to the meeting... to allow more time for the Commission to consider them. Please check the Commission's Web site, drbc...

  20. 39 CFR 3001.43 - Public attendance at Commission meetings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Public attendance at Commission meetings. 3001.43... Rules of General Applicability § 3001.43 Public attendance at Commission meetings. (a) Open Commission... meeting of the Commission shall be open to public observation. (2) Members of the public may not...

  1. 39 CFR 3001.43 - Public attendance at Commission meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Public attendance at Commission meetings. 3001.43... Rules of General Applicability § 3001.43 Public attendance at Commission meetings. (a) Open Commission... meeting of the Commission shall be open to public observation. (2) Members of the public may not...

  2. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  3. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  4. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  5. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  6. 28 CFR 0.124 - United States Parole Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false United States Parole Commission. 0.124 Section 0.124 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE United States Parole Commission § 0.124 United States Parole Commission. The U.S. Parole Commission...

  7. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... From the Federal Register Online via the Government Publishing Office COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled... oral statements should be addressed to Thomas Luebke, Secretary, U.S. Commission of Fine Arts, at...

  8. 47 CFR 0.401 - Location of Commission offices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Location of Commission offices. 0.401 Section 0... Information General § 0.401 Location of Commission offices. The Commission maintains several offices and... locations. (1) The main office of the Commission is located at 445 12th Street, SW., Washington, DC...

  9. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  10. 47 CFR 1.1 - Proceedings before the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Proceedings before the Commission. 1.1 Section 1.1 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE General Rules of Practice and Procedure General § 1.1 Proceedings before the Commission. The Commission may on...

  11. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... 200 Reporting Line for the Commission's Ethics Counsel AGENCY: Securities and Exchange Commission... rules to reflect that the Commission's Office of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of...

  12. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...

  13. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...

  14. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...

  15. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...

  16. 16 CFR 1000.6 - Commission decisions and records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... action, if known. (b) Other records in the custody of the Commission may be requested by e-mail (cpsc-os... Record of Commission Action. Copies of Minutes or of a Record of Commission Action may be obtained by e-mail (cpsc-os@cpsc.gov) or written request to the Secretary, Consumer Product Safety Commission,...

  17. 11 CFR 7.17 - Use of Commission employment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission Employees § 7.17 Use of Commission employment. A special Commission employee shall not use his or her Commission employment for a purpose that is, or gives the appearance of being, motivated by a... whom the employee has family, business or financial ties....

  18. 77 FR 64983 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission's staff may attend the following meetings related to the transmission planning activities...

  19. 45 CFR 701.10 - Membership of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Membership of the Commission. 701.10 Section 701.10 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS ORGANIZATION AND FUNCTIONS OF THE COMMISSION Organization Statement § 701.10 Membership of the Commission....

  20. 45 CFR 701.10 - Membership of the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Membership of the Commission. 701.10 Section 701.10 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS ORGANIZATION AND FUNCTIONS OF THE COMMISSION Organization Statement § 701.10 Membership of the Commission....

  1. 45 CFR 701.10 - Membership of the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Membership of the Commission. 701.10 Section 701.10 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS ORGANIZATION AND FUNCTIONS OF THE COMMISSION Organization Statement § 701.10 Membership of the Commission....

  2. 45 CFR 701.10 - Membership of the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Membership of the Commission. 701.10 Section 701.10 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS ORGANIZATION AND FUNCTIONS OF THE COMMISSION Organization Statement § 701.10 Membership of the Commission....

  3. 45 CFR 701.10 - Membership of the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Membership of the Commission. 701.10 Section 701.10 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS ORGANIZATION AND FUNCTIONS OF THE COMMISSION Organization Statement § 701.10 Membership of the Commission....

  4. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine...

  5. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine...

  6. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine...

  7. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine...

  8. 29 CFR 1626.19 - Filing of Commission lawsuit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Filing of Commission lawsuit. 1626.19 Section 1626.19 Labor Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION PROCEDURES-AGE DISCRIMINATION IN EMPLOYMENT ACT § 1626.19 Filing of Commission lawsuit. The right of the Commission to file a civil action under the ADEA is not...

  9. 11 CFR 103.1 - Notification of the commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Notification of the commission. 103.1 Section 103.1 Federal Elections FEDERAL ELECTION COMMISSION GENERAL CAMPAIGN DEPOSITORIES (2 U.S.C. 432(h)) § 103.1 Notification of the commission. Each committee shall notify the Commission of the...

  10. 22 CFR 401.8 - Decision by the whole Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Decision by the whole Commission. 401.8 Section 401.8 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General § 401.8 Decision by the whole Commission. The whole Commission shall consider and determine any...

  11. Arizona Commission of Indian Affairs 1986-87 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    This annual report includes a list of commission membership and staff; a map of state Indian reservations; a table of reservation acreages and populations; a list of commission meetings and those in attendance; a list of 1986-87 commission publications and an agency financial report. A section of "commission highlights" summarizes nine…

  12. 18 CFR 376.202 - Authority to move Commission offices.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Authority to move... to move Commission offices. The Commission may provide for removal of its headquarters to any... Chairman, the Commission officer or employee in charge of a regional office of the Commission may move...

  13. 18 CFR 376.202 - Authority to move Commission offices.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Authority to move... to move Commission offices. The Commission may provide for removal of its headquarters to any... Chairman, the Commission officer or employee in charge of a regional office of the Commission may move...

  14. 18 CFR 376.202 - Authority to move Commission offices.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Authority to move... to move Commission offices. The Commission may provide for removal of its headquarters to any... Chairman, the Commission officer or employee in charge of a regional office of the Commission may move...

  15. 18 CFR 376.202 - Authority to move Commission offices.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Authority to move... to move Commission offices. The Commission may provide for removal of its headquarters to any... Chairman, the Commission officer or employee in charge of a regional office of the Commission may move...

  16. 18 CFR 376.202 - Authority to move Commission offices.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Authority to move... to move Commission offices. The Commission may provide for removal of its headquarters to any... Chairman, the Commission officer or employee in charge of a regional office of the Commission may move...

  17. 17 CFR 144.1 - Service upon the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESPONSE TO SUBPOENAS OR OTHER DEMANDS OF A COURT § 144.1 Service upon the Commission. (a) Subject to... service of a demand directed to the Commission or to an employee of the Commission for documentary... demand must be addressed to the Secretary of the Commission, Three Lafayette Centre, 1155 21st Street,...

  18. 29 CFR 2200.93 - Briefs before the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Briefs before the Commission. 2200.93 Section 2200.93 Labor... Posthearing Procedures § 2200.93 Briefs before the Commission. (a) Requests for briefs. The Commission ordinarily will request the parties to file briefs on issues before the Commission. After briefs are...

  19. Arizona Commission of Indian Affairs 1986-87 Annual Report.

    ERIC Educational Resources Information Center

    Arizona Commission of Indian Affairs, Phoenix.

    This annual report includes a list of commission membership and staff; a map of state Indian reservations; a table of reservation acreages and populations; a list of commission meetings and those in attendance; a list of 1986-87 commission publications and an agency financial report. A section of "commission highlights" summarizes nine…

  20. U.S. Nuclear Regulatory Commission

    MedlinePlus

    ... Reactors, gives Chris Fallon, vice president of new nuclear development at Duke Energy Florida, … more… Spotlight Strategic Plan Baffle-Former Bolts Open-Phase Electrical Issue Response to GAO Materials Licensing Audit Additional ... Plant Project Aim Commission Documents Fire Protection ...

  1. Solar Dynamics Observatory Launch and Commissioning

    NASA Technical Reports Server (NTRS)

    O'Donnell, James R., Jr.; Kristin, D.; Bourkland, L.; Hsu, Oscar C.; Liu, Kuo-Chia; Mason, Paul A. C.; Morgenstern, Wendy M.; Russo, Angela M.; Starin, Scott R.; Vess, Melissa F.

    2011-01-01

    The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

  2. 16 CFR 4.15 - Commission meetings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... announcements of meetings. For each meeting, the Commission shall announce: (i) The time, place and subject matter of the meeting, (ii) Whether the meeting will be open or closed to the public, and (iii) The name... announcement shall be made at least one week before the meeting except that where the agency...

  3. 75 FR 48661 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... can increase educational opportunity by improving school funding equity. The Commission will also make recommendations for restructuring school finance systems to achieve equity in the distribution of educational resources and further student performance, especially for the students at the lower end of the...

  4. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following... Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver are effective on... Interim Domestic Violence Waiver. The documents are being published for interim use on the Indian Affairs...

  5. Report of Programme Commission II (Natural Sciences).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.

    As the first part of the report of the Programme Commission II, a summary of discussions on plans for natural sciences and their applications is presented in this document. The two agenda items are: (1) detailed consideration of the 1973-74 draft program and budget and of the 1973-78 draft medium-term outline, and (2) desirability of adopting an…

  6. Appalachian Regional Commission Annual Report, 2000.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    In 2000, the Appalachian Regional Commission (ARC), in cooperation with local development districts, nonprofit organizations, and many small municipalities, expanded programs to help Appalachia's distressed counties become economically competitive. The effort calls for increased funding for technical assistance and capacity building in distressed…

  7. Appalachian Regional Commission: 1987 Annual Report.

    ERIC Educational Resources Information Center

    Russell, Jack, Ed.; And Others

    The Appalachian Regional Commission (ARC) used its $105 million appropriation for fiscal year 1987 to support three major program areas in the 13 state region: (1) creating and retaining regional jobs; (2) assisting in construction of basic facilities, particularly water and sewer systems, in the region's 90 poorest counties; and (3) working…

  8. Commission 19: ROTATION OF THE EARTH

    NASA Astrophysics Data System (ADS)

    Brzeziński, Aleksander; Ma, Chopo; Dehant, Véronique; Defraigne, Pascale; Dickey, Jean O.; Huang, Cheng-Li; Souchay, Jean; Vondrák, Jan; Charlot, Patrick; Richter, Bernd; Schuh, Harald

    2010-05-01

    The IAU Commission 19 meeting during the XXVII IAU General Assembly in Rio de Janeiro was held on Wednesday 5 August 2009, sessions 3 (14:00-15:30) and 4 (16:00-17:30). It was attended by about 40 participants. The meeting was split into three sessions.

  9. Wyoming Community College Commission Agency Annual Report.

    ERIC Educational Resources Information Center

    Wyoming Community Coll. Commission, Cheyenne.

    This paper reports on outcomes of community college programs monitored by the Wyoming Community College Commission (WCCC). The document covers the following WCCC objectives: (1) Study of tuition rates for the community colleges; (2) Negotiation of contracts and provision of financial support for administrative computing system components and…

  10. Appalachian Regional Commission. Annual Report 1969.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    After 4 years of operation, the Appalachian Regional Commission (ARC) presents this 1969 annual report and evaluation of its activities as required by the Appalachian Regional Development Act of 1965. A brief overview is given of the history of the program, the Federal-state relationship, and strategies for regional development. Appalachia is then…

  11. Locality commissioning. The long and winding road.

    PubMed

    Colgan, E; Rose, J

    1997-11-20

    It is unlikely that locality commissioning, as it stands, could respond to any future government policy that identifies it as the way forward. The size of localities should remain flexible. The government has indicated that it wishes to support pilots where localities have delegated budgetary responsibility, but it is unclear whether this will emerge as a preferred model.

  12. Appalachian Regional Commission: 1980 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1980, past achievements, and future goals. Major accomplishments of 1980 include: allocation of almost $13 million for 1,023 nonhighway projects; completion or construction of almost 60% of the Appalachian…

  13. Commission 14: Atomic and Molecular Data

    NASA Astrophysics Data System (ADS)

    Johansson, Sveneric; Federman, Steven R.; Wahlgren, Glenn M.; Adelman, Saul J.; Biémont, Emile; Lawler, James E.; Mickelson, Michael E.; Morton, Donald C.; Ryabchikova, Tanya A.; Smith, Peter L.; Stehle, Chantal

    2007-12-01

    In our commission the vice-president (VP) becomes the president, and a new VP is chosen from members of the Organizing Committee. The position of secretary was discontinued and its responsibilities incorporated into the VP position. The president announced that the new officers are Steven R. Federman (president) and Glenn M. Wahlgren (vice-president).

  14. 76 FR 27034 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... resources and further student performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in...

  15. 77 FR 31605 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... student performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies...

  16. 77 FR 484 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... resources and further student performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in...

  17. 76 FR 62394 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ... student performance, especially for the students at the lower end of the achievement gap. The Commission will examine the disparities in meaningful educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies...

  18. Commissioning for the European XFEL facility

    NASA Astrophysics Data System (ADS)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  19. COMMISSION 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Genova, Françoise; Norris, Raymond P.; Bessel, M. S.; Dluzhnevskaia, O.; Jenkner, H.; Malkov, O.; Murtagh, F.; Nakajima, K.; Ochsenbein, F.; Pence, W.; Schmitz, M.; Wielen, R.; Zhao, Y. H.

    2007-03-01

    The triennial report of Commission V Documentation and Astronomical Data/Documentation et Données Astronomiques covers 2002-2005 activities, and in particular the activities of the five Working Groups: Working Group Astronomical Data; Working Group Designations; Working Group Libraries; Working Group FITS; Working Group Virtual Observatories; and of Task Force for the Preservation and Digitization of Photographic Plates.

  20. NEA and the Educational Policies Commission

    ERIC Educational Resources Information Center

    Urban, Wayne

    2007-01-01

    In 1957, the year the National Education Association (NEA) celebrated its 100th anniversary, the Educational Policies Commission (EPC)--a prestigious group co-sponsored by NEA and the American Association of School Administrators--published a document titled "Higher Education in a Decade of Decision." NEA intended the report to address…

  1. 10 CFR 110.113 - Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... its decision on the license application, the reasons for the decision and any dissenting views. (b... his interest may be affected has been provided a fair opportunity to present his views. (e) The Commission may: (1) Defer any hearing; (2) Consolidate applications for hearing; (3) Narrow or broaden the...

  2. The ALMA Commissioning and Science Verification Team

    NASA Astrophysics Data System (ADS)

    Hales, A.; Sheth, K.; Wilson, T. L.

    2010-04-01

    The goal of Commissioning is to take ALMA from the stage reached at the end of AIV, that is, a system that functions at an engineering level to an instrument that meets the science / astronomy requirements. Science Verification is the quantitative confirmation that the data produced by the instrument is valid and has the required characteristics in terms of sensitivity, image quality and accuracy.

  3. 19 CFR 127.34 - Auctioneer's commissions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Auctioneer's commissions. 127.34 Section 127.34 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY GENERAL ORDER, UNCLAIMED, AND ABANDONED MERCHANDISE Proceeds of Sale § 127.34 Auctioneer's...

  4. 19 CFR 127.34 - Auctioneer's commissions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Auctioneer's commissions. 127.34 Section 127.34 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY GENERAL ORDER, UNCLAIMED, AND ABANDONED MERCHANDISE Proceeds of Sale § 127.34 Auctioneer's...

  5. Appalachian Regional Commission: 1979 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  6. Boston Water & Sewer Commission (BWSC) | Stormwater ...

    EPA Pesticide Factsheets

    2017-04-10

    The Boston Water and Sewer Commission (BWSC) was issued National Pollutant Discharge Elimination System (NPDES) Permit MAS010001, which became effective on October 29, 1999, authorizing stormwater and allowable non-stormwater discharges from its municipal separate storm sewer system (MS4).

  7. The Background of the Commission on Tests.

    ERIC Educational Resources Information Center

    Pearson, Richard; Manning, Winton H.

    This paper concerns the projected changes suggested for testing in the future by the College Entrance Examination Board (CEEB). A Commission on Tests is held desirable, the general purpose of which is to describe a comprehensive series of testing activities supporting the large-scale distribution of students among college level institutions in the…

  8. Appalachian Regional Commission: 1986 Annual Report.

    ERIC Educational Resources Information Center

    Russell, Jack, Ed.; And Others

    The Appalachian Regional Commission used its $120 million appropriation for fiscal year 1986 to create and retain jobs under the jobs and private investment program, provide basic public facilities to the worst-off Appalachian counties under the distressed counties program, and to work toward closing the gaps in the Appalachian Development Highway…

  9. 1977 Annual Report - Appalachian Regional Commission.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Narrative and tabular data, maps, and photographs comprise this annual report for fiscal 1977 on the Appalachian Regional Commission. Among highlights reported for the year were: completion of half the mileage in the Appalachian Development Highway system, further reducing inhabitants' isolation from jobs, schools, and markets; continued reversal…

  10. Wyoming Community College Commission Annual Report, 2009

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2009

    2009-01-01

    The Wyoming Community College Commission (WCCC) collaborates with Wyoming's seven community colleges to provide educational experiences that strengthen, support and enrich communities and prepare students to successfully meet life's challenges and recognize and profit from opportunities. Wyoming's seven community colleges provide affordable,…

  11. Wyoming Community College Commission Annual Report, 2008

    ERIC Educational Resources Information Center

    Wyoming Community College Commission, 2008

    2008-01-01

    The Wyoming Community College Commission (WCCC) collaborates with Wyoming's seven community colleges to provide educational experiences that strengthen, support and enrich communities and prepare students to successfully meet life's challenges and recognize and profit from opportunities. Wyoming's seven community colleges provide affordable,…

  12. The Truman Commission: International Developments for Colleges

    ERIC Educational Resources Information Center

    Burke, Kenneth M.

    2008-01-01

    Research briefly details the purpose of the Harry S. Truman administration's Commission on Higher Education for Democracy to support community colleges. Contrary to histories that define later origins in the 1960s, this paper makes an argument that the historical foundations of ideation for international education in community colleges originate…

  13. Commissioning of the ATLAS Liquid Argon Calorimeters

    SciTech Connect

    Cooke, Mark S.

    2009-12-17

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  14. 77 FR 77247 - Reestablishment of Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... From the Federal Register Online via the Government Publishing Office ] Vol. 77 Monday, No. 250 December 31, 2012 Part IV The President Executive Order 13634--Reestablishment of Advisory Commission #0; #0; #0; Presidential Documents #0; #0; #0;#0;Federal Register / Vol. 77 , No. 250 / Monday, December 31, 2012 / Presidential Documents#0;#0; #0; #0;Title 3--...

  15. Bicentennial Commission Busy with Exciting Projects.

    ERIC Educational Resources Information Center

    Stone, Kirk

    1989-01-01

    Based on an interview with U.S. Chief Justice Warren E. Burger, this article surveys several of the projects launched by the Commission on the Bicentennial of the Constitution. These projects include: the National Historical Pictorial Map Contest; the Bicentennial School Recognition Program; the Bicentennial Educational Grant Program; and the…

  16. 76 FR 72452 - CFC-50 Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... Doc No: 2011-30240] OFFICE OF PERSONNEL MANAGEMENT CFC-50 Commission AGENCY: Office of Personnel... advise the Director of the U.S. Office of Personnel Management (OPM) on strengthening the integrity, the... Personnel Management, Theodore Roosevelt Executive Conference Room, 5th Floor, Theodore Roosevelt...

  17. 75 FR 48662 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Equity and Excellence Commission AGENCY: Office for Civil Rights, U.S. Department of Education. ACTION... Education (Secretary) invites interested parties to submit nominations for individuals to serve on...

  18. 32 CFR 17.3 - Commission personnel.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) From time to time, it may be appropriate for a Presiding Officer to forward to the Appointing Authority... classified or protected evidence and information is appropriately safeguarded at all times and that only... personnel to facilitate the impartial and expeditious conduct of full and fair trials by military commission. ...

  19. 32 CFR 17.3 - Commission personnel.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) From time to time, it may be appropriate for a Presiding Officer to forward to the Appointing Authority... classified or protected evidence and information is appropriately safeguarded at all times and that only... personnel to facilitate the impartial and expeditious conduct of full and fair trials by military commission. ...

  20. 32 CFR 17.3 - Commission personnel.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) From time to time, it may be appropriate for a Presiding Officer to forward to the Appointing Authority... classified or protected evidence and information is appropriately safeguarded at all times and that only... personnel to facilitate the impartial and expeditious conduct of full and fair trials by military commission. ...

  1. Report of the Commission on Quantum Quality.

    ERIC Educational Resources Information Center

    Thor, Linda; And Others

    The Commission on Quantum Quality was established by the Maricopa County Community College District (MCCCD) in February, 1992, to investigate total quality management (TQM) programs in community colleges, universities, the government sector, and business and industry in order to recommend an appropriate program for MCCCD. To gather information,…

  2. 77 FR 2711 - Equity and Excellence Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... Equity and Excellence Commission AGENCY: Office for Civil Rights, Education. ACTION: Notice of open meeting (Amended). SUMMARY: On January 5, 2012, the Office for Civil Rights published in the Federal Register (FR Doc. 2011-33800 Filed 1-4-12; 8:45 a.m.) a notice of open meeting on January 23, 2012 for...

  3. Mississippi Library Commission Data Network Specifications.

    ERIC Educational Resources Information Center

    Evans Associates, Thiensville, WI.

    This document provides a detailed design for the data portion of the Mississippi Library Commission (MLC) public library network. The data network is based on Frame Relay technology, and would provide more functionality at a higher speed than a previously considered dial-in network could. The document is divided into 16 sections: (1) Introduction;…

  4. Potential Benefits of Commissioning California Homes

    SciTech Connect

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California

  5. DAS28-CRP and DAS28-ESR cut-offs for high disease activity in rheumatoid arthritis are not interchangeable

    PubMed Central

    Fleischmann, Roy M; van der Heijde, Désirée; Gardiner, Philip V; Szumski, Annette; Marshall, Lisa; Bananis, Eustratios

    2017-01-01

    Background In most patients with rheumatoid arthritis (RA), Disease Activity Score 28-joint count C reactive protein (DAS28-CRP) is lower than DAS28 erythrocyte sedimentation rate (DAS28-ESR), suggesting that use of the DAS28-ESR cut-off to assess high disease activity (HDA) with DAS28-CRP may underestimate the number of patients with HDA. We determined the DAS28-CRP value corresponding to the validated DAS28-ESR cut-off for HDA. Methods Baseline data were pooled from 2 clinical studies evaluating etanercept (ETN) plus methotrexate (MTX) or MTX in early RA; DAS28-CRP and DAS28-ESR were obtained, allowing the determination of the DAS28-CRP HDA value best corresponding to the DAS28-ESR cut-off of >5.1. Results At baseline, as expected, fewer patients had HDA by DAS28-CRP than DAS28-ESR; DAS28-CRP>5.1 and DAS28-ESR>5.1 had only modest agreement (κ coefficients 0.45–0.54). Mean DAS28-CRP and DAS28-ESR were 5.7 and 6.2, respectively, in the ETN+MTX group (n=571), and 6.0 and 6.5 in the MTX group (n=262). A DAS28-CRP cut-off of 4.6 corresponded to a DAS28-ESR cut-off of 5.1. Conclusions We have shown that a DAS28-CRP of 4.6 corresponds to 5.1 for DAS28-ESR. Since this is substantially lower than the DAS28-ESR cut-off of 5.1, using 5.1 as the cut-off for DAS28-CRP underestimates disease activity in RA. Trial registration number NCT00195494; NCT00913458. PMID:28255449

  6. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect

    Webster, Lia

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  7. North American Commission on Stratigraphic Nomenclature Note 66: records of Stratigraphic Commission, 2003-2013

    USGS Publications Warehouse

    Easton, Robert M.; Catuneanu, Octavian; Donovan, Art D.; Fluegeman, Richard H.; Hamblin, A.P.; Harper, Howard; Lasca, Norman P.; Morrow, Jared R.; Orndorff, Randall C.; Sadler, Peter; Scott, Robert W.; Tew, Berry H.

    2014-01-01

    Note 66 summarizes activities of the North American Commission on Stratigraphic Nomenclature (NACSN) from November 2003 to October 2013 and is condensed from the minutes of the NACSN’s 58th to 68th annual meetings1. The purposes of the Commission are to develop statements of stratigraphic principles,recommend procedures applicable to the classification and nomenclature of stratigraphic and related units, review problems in classifying and naming stratigraphic and related units, and formulate expressions of judgment on these matters.

  8. A History of the Atomic Energy Commission

    DOE R&D Accomplishments Database

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  9. Commissioning of the PRIOR proton microscope

    SciTech Connect

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; Hoffmann, D. H. H.; Ionita, B.; Kantsyrev, A.; Krasik, Ya. E.; Lang, P. M.; Lomonosov, I.; Mariam, F. G.; Markov, N.; Mintsev, V. B.; Nikolaev, D.; Panyushkin, V.; Rodionova, M.; Schanz, M.; Schoenberg, K.; Semennikov, A.; Shestov, L.; Skachkov, V. S.; Turtikov, V.; Udrea, S.; Vasylyev, O.; Weyrich, K.; Wilde, C.; Zubareva, A.; Merrill, F. E.

    2016-02-18

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well as the results of the first static and dynamic protonradiography experiments performed at GSI.

  10. Status of the SPIRAL2 injector commissioning

    NASA Astrophysics Data System (ADS)

    Thuillier, T.; Angot, J.; Barué, C.; Bertrand, P.; Biarrotte, J. L.; Canet, C.; Denis, J.-F.; Ferdinand, R.; Flambard, J.-L.; Jacob, J.; Jardin, P.; Lamy, T.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Peaucelle, C.; Roger, A.; Sole, P.; Touzery, R.; Tuske, O.; Uriot, D.

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ˜50. A status of its assembly is proposed.

  11. Division V: Commission 42: Close Binaries

    NASA Astrophysics Data System (ADS)

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  12. LUCIFER1 commissioning at the LBT

    NASA Astrophysics Data System (ADS)

    Ageorges, N.; Seifert, W.; Jütte, M.; Knierim, V.; Lehmitz, M.; Germeroth, A.; Buschkamp, P.; Polsterer, K.; Pasquali, A.; Naranjo, V.; Gemperlein, H.; Hill, J.; Feiz, C.; Hofmann, R.; Laun, W.; Lederer, R.; Lenzen, R.; Mall, U.; Mandel, H.; Müller, P.; Quirrenbach, A.; Schäffner, L.; Storz, C.; Weiser, P.

    2010-07-01

    LUCIFER 1 is the rst of two identical camera-spectrograph units installed at the LBT (Large Binocular Telescope) on Mount Graham in Arizona. Its commissioning took place between September 2008 and November 2009 and has immediately been followed by science operations since December 2009. LUCIFER has a 4x4 arcminute eld of view. It is equipped with a 2048x2048 pixel HAWAII-2 array, suitable lters (broad-band z, J, H, K & Ks plus 12 medium and narrow band near-infrared lters) and three gratings for spectroscopy for a resolution of up to 15000. LUCIFER has 3 cameras: two specic for seeing limited imaging (the N3.75 camera, with 0.12"/pixel) and spectroscopy (the N1.8 camera, with 0.25"/pixel) and one for diraction limited observations (the N30 camera). We report here about the completed seeing-limited commissioning, thus using only two of the cameras.

  13. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  14. Initial Commissioning Experience With the LCLS Injector

    SciTech Connect

    Akre, R.; Castro, J.; Ding, Y.; Dowell, D.H.; Emma, P.; Frisch, J.; Gilevich, A.; Hays, G.; Hering, P.; Huang, Z.; Iverson, R.; Krejcik, P.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Rivetta, C.; Saleski, M.; Schmerge, J.F.; Schultz, D.; Turner, J.; Welch, J.; /SLAC /DESY

    2007-11-02

    The Linac Coherent Light Source (LCLS) is a SASE xray Free-Electron Laser (FEL) project presently under construction at SLAC [1]. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam is taking place during the spring and summer of 2007. The second phase of construction, including second bunch compressor and full linac, will begin later, in the fall of 2007. We report here on experience gained during the first phase of machine commissioning, including RF photocathode gun, linac booster section, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  15. Commissioning Results of the LCLS Injector

    SciTech Connect

    Dowell, D.H.; Akre, R.; Ding, Y.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Huang, Z.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; Frohlich, L.; Limberg, T.; Prat, E.; /DESY

    2007-11-16

    The Linac Coherent Light Source (LCLS) is a SASE xray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam has recently been completed. The second phase of construction, including second bunch compressor and full linac, is planned for 2008. In this paper, we report experimental results and experience gained during the first phase of machine commissioning. This includes the cathode, drive laser, RF photocathode gun, linac booster section, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  16. Commissioning of the PRIOR proton microscope

    DOE PAGES

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; ...

    2016-02-18

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well asmore » the results of the first static and dynamic protonradiography experiments performed at GSI.« less

  17. Status of the SPIRAL2 injector commissioning

    SciTech Connect

    Thuillier, T. Angot, J.; Jacob, J.; Lamy, T.; Sole, P. [LPSC, Université Grenoble Alpes, CNRS Barué, C.; Bertrand, P.; Canet, C.; Ferdinand, R.; Flambard, J.-L.; Jardin, P.; Lemagnen, F.; Maunoury, L.; Osmond, B. [GANIL, CNRS Biarrotte, J. L. [IPN Orsay, Université Paris Sud, CNRS Denis, J.-F.; Roger, A.; Touzery, R.; Tuske, O.; Uriot, D. [Irfu, CEA Saclay, DSM and others

    2016-02-15

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  18. Status of the SPIRAL2 injector commissioning.

    PubMed

    Thuillier, T; Angot, J; Barué, C; Bertrand, P; Biarrotte, J L; Canet, C; Denis, J-F; Ferdinand, R; Flambard, J-L; Jacob, J; Jardin, P; Lamy, T; Lemagnen, F; Maunoury, L; Osmond, B; Peaucelle, C; Roger, A; Sole, P; Touzery, R; Tuske, O; Uriot, D

    2016-02-01

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  19. Division XII / Commission 5 / Working Group Libraries

    NASA Astrophysics Data System (ADS)

    Grothkopf, Uta; Murtagh, Fionn; Birdie, Christina; Bishop, Marsha; Bobis, Laurence; Coletti, Donna J.; Corbin, Brenda G.; Gomez, Monique; Naimova, Halima

    The IAU Working Group on Libraries was officially recognized for the first time in the Transactions of the IAU XXIA Reports on Astronomy (McNally 1991), but librarians were involved in Commission 5 activities before that (largely due to the efforts of George A. Wilkins, president of the Commission from 1982 to 1988, see Transactions of the IAU XXA Reports on Astronomy, Swings 1988). Wayne Warren (NASA GSFC, MD, USA) and Helen Knudsen (Calech, CA, USA) were the group's first chairpersons, Brenda Corbin (U.S. Naval Observatory) became Helen Knudsen's successor in 1990. Since 1996, Fionn Murtagh (School of Computer Science, Queen's University of Belfast, Northern Ireland) and Uta Grothkopf (European Southern Observatory, Germany) have been co-chairs.

  20. NIF Commissioning and Initial Performance Results

    SciTech Connect

    Van Wonterghem, B M; Burkhart, S C; Haynam, C A; Manes, K R; Marshall, C D; Murray, J E; Spaeth, M L; Speck, D R; Sutton, S B; Wegner, P J

    2003-12-19

    The National Ignition Facility at LLNL recently commissioned the first set of four beam lines into the target chamber. This effort, also called NIF Early Light, demonstrated the entire laser system architecture from master oscillator through target and initial X-ray diagnostics. This paper describes the detailed commissioning and installation steps for one of NIF's 48 beam quads. Using a dedicated single beam line Precision Diagnostic System, performance was explored over the entire power versus energy space from 6.4 TW/beam for sub-nanosecond pulses to 25 kJ/beam for 23 ns pulses at 1 {omega}. NEL also demonstrated record single beam line frequency converted Nd:Glass laser energies of 11.3 kJ at 2 {omega} and 10.4 kJ at 3{omega}.

  1. The California Debris Commission: A History

    DTIC Science & Technology

    1981-01-01

    Secretary Division with headquarters in Salt Lake City. Major E.H. Ropes (General Order No. 40, Office of Chief of Engi- 1929 Lieutenant Colonel J...Franklin Bell, President neers, dated October 26, 1942) General Warren Major E.H. Ropes , Secretary to July 31, 1928 T. Hannum became Division Engineer...office of the Pacific Major E.H. Ropes , member Division was established at the pre-existing Until September 11, 1929, the Commission consist- South

  2. Indexes to Nuclear Regulatory Commission Issuances

    SciTech Connect

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  3. European Commission activities in eHealth.

    PubMed

    Olsson, Silas; Lymberis, Andreas; Whitehouse, Diane

    2004-12-01

    Health-care is an information-intensive and knowledge-demanding sector, which is why eHealth solutions are so important in this field. The European Commission (EC) has been initiating and funding research and development activities regarding Information and Communication Technologies (ICT) for health, or "eHealth", since 1988. These programmes covered priority topics like electronic health-care records, regional and national health networks, telemedicine in homecare and care-at-the-point-of-need to support continuity of care concepts, systems to support people to stay healthy, and systems and tools to support health professionals to work more efficiently and safely on patients. During the 15-year span of the programmes, the European Union (EU) has contributed about 500 million Euro to approximately 400 R&D projects, support activities, best practice and studies covering technical, clinical, ethical, legal, organisational and market issues. eHealth has shown proven benefits in application fields like improved access to care, care at the point-of-need, citizen-centred care, improved quality and cost containment. Such applications were on show at the EU High Level eHealth Conferences in Brussels, Belgium, in 2003, and in Cork, Ireland, in 2004. eHealth is now on the governmental agenda of EU Member States to be implemented on a broader scale. In line with this development, the Commission has taken a number of policy initiatives. A European Union Action Plan for a European eHealth Area was published by the Commission in April 2004 and endorsed by the EU health ministers in June 2004. This means that, for the first time, Europe has a coherent agenda for the implementation of eHealth. This report will concentrate on eHealth activities initiated by the Information Society Directorate-General of the European Commission.

  4. EEOC raps hospital. Equal Employment Opportunity Commission.

    PubMed

    1998-02-06

    Baltimore's Veterans Affairs Medical Center lost a $260,000 judgement to a former medical clerk discriminated against by the hospital. The hospital alleged the employee was unreliable and had poor attendance, and the employee lost his home and custody of his daughter after being fired. The Equal Employment Opportunity Commission (EEOC) found the medical center's position implausible. In addition to the cash award, the EEOC recommended that the employee be reinstated.

  5. Commission 37: Star Clusters and Associations

    NASA Astrophysics Data System (ADS)

    Elmegreen, Bruce; Carraro, Giovanni; Hatzidimitriou, Despina; de Grijs, Richard; Minniti, Dante; Lada, Charles; Da Costa, Gary; Tosi, Monica; Deng, Licai; Lee, Young-Wook; Sarajedini, Ata

    2010-05-01

    The business session for Commission 37 was held on 11 August 2009 at the IAU General Assembly in Rio de Janeiro. The meeting was attended by about a dozen members of our Comission, including President Elmegreen, VP Carraro and several committee members. We introduced ourselves and then went through a powerpoint presentation first prepared by outgoing President Hatzidimitriou and revised by incoming President Elmegreen. The contents of the powerpoint presentation are given in this summary.

  6. On the calibration and commissioning of lighting controls

    SciTech Connect

    Rubinstein, F.; Avery, D.; Jennings, J.; Blanc, S.

    1997-10-01

    Lighting controls have the potential to capture significant energy savings in commercial buildings if properly specified, installed, commissioned and maintained. Proper commissioning is often absent in lighting projects and the lack of commissioning can significantly reduce a project`s energy savings potential. The paper focuses on the importance of good commissioning practice for obtaining satisfactory performance from lighting control systems and discusses the difficulties of commissioning today`s systems. Some practical suggestions for commissioning lighting controls is offered as well as advice to specifiers and early adopters to aid them in selecting controls that are most appropriate to their requirements.

  7. Commissioning an Engineering Scale Coal Gasifier

    SciTech Connect

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  8. Commissioning Experience for the SNS Linac

    SciTech Connect

    Aleksandrov, A.; Assadi, S.; Campisi, I.; Chu, P.; Cousineau, S.; Danilov, V.; Dodson, B.G.; Galambos, J.; Jeon, D.; Henderson, S.; Holtkamp, N.; Kravchuk, L.; Kim, S.; Plum, M.; Tanke, E.; Stockli, M.

    2005-06-08

    The Spallation Neutron Source accelerator systems will deliver a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. A 2.5 MeV beam from the Front End is accelerated to 86 MeV in a Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and then to 1 GeV in a Superconducting Linac. The staged beam commissioning of the accelerator complex is proceeding as component installation progresses. The Front End, Drift Tube Linac and part of the Coupled-Cavity Linac have been commissioned at ORNL. The primary design goals of peak current, transverse emittance and beam energy have been achieved. Results and status of the beam commissioning program will be presented.

  9. NSLS-II commissioning and operation

    SciTech Connect

    Wang, G. Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S.; and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  10. Gran Telescopio Canarias Commissioning Instrument Optomechanics

    NASA Astrophysics Data System (ADS)

    Espejo, Carlos; Cuevas, Salvador; Sanchez, Beatriz; Flores, Ruben; Lara, Gerardo; Farah, Alejandro; Godoy, Javier; Bringas, Vicente; Chavoya, Armando; Dorantes, Ariel; Manuel Montoya, Juan; Rangel, Juan Carlos; Devaney, Nicholas; Castro, Javier; Cavaller, Luis

    2003-02-01

    Under a contract with the GRANTECAN, the Commissioning Instrument is a project developed by a team of Mexican scientists and engineers from the Instrumentation Department of the Astronomy Institute at the UNAM and the CIDESI Engineering Center. This paper will discuss in some detail the final Commissioning Instrument (CI) mechanical design and fabrication. We will also explain the error budget and the barrels design as well as their thermal compensation. The optical design and the control system are discussed in other papers. The CI will just act as a diagnostic tool for image quality verification during the GTC Commissioning Phase. This phase is a quality control process for achieving, verifying, and documenting the performance of each GTC sub-systems. This is a very important step for the telescope life. It will begin on starting day and will last for a year. The CI project started in December 2000. The critical design phase was reviewed in July 2001. The CI manufacturing is currently in progress and most parts are finished. We are now approaching the factory acceptance stage.

  11. Commissioning of the CMS Forward Pixel Detector

    SciTech Connect

    Kumar, Ashish; /SUNY, Buffalo

    2008-12-01

    The Compact Muon Solenoid (CMS) experiment is scheduled for physics data taking in summer 2009 after the commissioning of high energy proton-proton collisions at Large Hadron Collider (LHC). At the core of the CMS all-silicon tracker is the silicon pixel detector, comprising three barrel layers and two pixel disks in the forward and backward regions, accounting for a total of 66 million channels. The pixel detector will provide high-resolution, 3D tracking points, essential for pattern recognition and precise vertexing, while being embedded in a hostile radiation environment. The end disks of the pixel detector, known as the Forward Pixel detector, has been assembled and tested at Fermilab, USA. It has 18 million pixel cells with dimension 100 x 150 {micro}m{sup 2}. The complete forward pixel detector was shipped to CERN in December 2007, where it underwent extensive system tests for commissioning prior to the installation. The pixel system was put in its final place inside the CMS following the installation and bake out of the LHC beam pipe in July 2008. It has been integrated with other sub-detectors in the readout since September 2008 and participated in the cosmic data taking. This report covers the strategy and results from commissioning of CMS forward pixel detector at CERN.

  12. Dasty3, a WEB framework for DAS

    PubMed Central

    Villaveces, Jose M.; Jimenez, Rafael C.; Garcia, Leyla J.; Salazar, Gustavo A.; Gel, Bernat; Mulder, Nicola; Martin, Maria; Garcia, Alexander; Hermjakob, Henning

    2011-01-01

    Motivation: Dasty3 is a highly interactive and extensible Web-based framework. It provides a rich Application Programming Interface upon which it is possible to develop specialized clients capable of retrieving information from DAS sources as well as from data providers not using the DAS protocol. Dasty3 provides significant improvements on previous Web-based frameworks and is implemented using the 1.6 DAS specification. Availability: Dasty3 is an open-source tool freely available at http://www.ebi.ac.uk/dasty/ under the terms of the GNU General public license. Source and documentation can be found at http://code.google.com/p/dasty/. Contact: hhe@ebi.ac.uk PMID:21798964

  13. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24

  14. Investigation of the persistence of new building commissioning

    SciTech Connect

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  15. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM § 9.2 Establishment of Military Commissions. In accordance with the President's Military...

  16. 32 CFR 9.2 - Establishment of Military Commissions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROCEDURES FOR TRIALS BY MILITARY COMMISSIONS OF CERTAIN NON-UNITED STATES CITIZENS IN THE WAR AGAINST TERRORISM § 9.2 Establishment of Military Commissions. In accordance with the President's Military...

  17. 29 CFR 2203.3 - Public attendance at Commission meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., or for the use of an agency responsible for the regulation or supervision of financial institutions... Commission's issuance of a subpoena or the Commission's participation in a civil action or proceeding,...

  18. Report of the State of Nevada Commission on Nuclear Projects

    SciTech Connect

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission`s functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts.

  19. Closer view looking to the Interstate Commerce Commission building and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Closer view looking to the Interstate Commerce Commission building and Ariel Rios Federal building - Interstate Commerce Commission, Constitution Avenue between Twelfth and Fourteenth streets, Washington, District of Columbia, DC

  20. 3 CFR - Blue Ribbon Commission on America's Nuclear Future

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generate clean nuclear energy is crucial to our ability to combat climate change, enhance energy security... considers. Where appropriate, the Commission may also identify potential statutory changes. The Commission...

  1. 17 CFR 12.9 - Practice before the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... shall recommend what action the Commission should take respecting the appearance of such person as..., who has not been suspended or disbarred from appearance and practice before the Commission in...

  2. 17 CFR 12.9 - Practice before the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... shall recommend what action the Commission should take respecting the appearance of such person as..., who has not been suspended or disbarred from appearance and practice before the Commission in...

  3. 17 CFR 201.441 - Commission consideration of Board determinations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for review. The Commission may, on its own initiative, order review of any final disciplinary sanction... where the Commission believes that such briefing could significantly aid the decisional process. ...

  4. Commission on Accreditation of Allied Health Education Programs

    MedlinePlus

    ... Testimonials Archives Commission on Accreditation of Allied Health Education Programs Search for: 727.210.2350 | mail@caahep. ... CAAHEP? The Commission on Accreditation of Allied Health Education Programs is the largest programmatic accreditor of the ...

  5. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  6. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  7. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    NASA Astrophysics Data System (ADS)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  8. 28 CFR 524.25 - U.S. Parole Commission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false U.S. Parole Commission. 524.25 Section..., CLASSIFICATION, AND TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.25 U.S. Parole Commission. The U.S. Parole Commission is the releasing authority for all YCA inmates except for full...

  9. 28 CFR 524.25 - U.S. Parole Commission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false U.S. Parole Commission. 524.25 Section..., CLASSIFICATION, AND TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.25 U.S. Parole Commission. The U.S. Parole Commission is the releasing authority for all YCA inmates except for full...

  10. 28 CFR 524.25 - U.S. Parole Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false U.S. Parole Commission. 524.25 Section..., CLASSIFICATION, AND TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.25 U.S. Parole Commission. The U.S. Parole Commission is the releasing authority for all YCA inmates except for full...

  11. 28 CFR 524.25 - U.S. Parole Commission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false U.S. Parole Commission. 524.25 Section..., CLASSIFICATION, AND TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.25 U.S. Parole Commission. The U.S. Parole Commission is the releasing authority for all YCA inmates except for full...

  12. 28 CFR 524.25 - U.S. Parole Commission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false U.S. Parole Commission. 524.25 Section..., CLASSIFICATION, AND TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.25 U.S. Parole Commission. The U.S. Parole Commission is the releasing authority for all YCA inmates except for full...

  13. 16 CFR 1018.23 - Designated Commission employee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Designated Commission employee. 1018.23 Section 1018.23 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ADVISORY COMMITTEE MANAGEMENT Operation of Advisory Committees § 1018.23 Designated Commission employee. (a) The Chairman shall...

  14. 16 CFR § 1018.23 - Designated Commission employee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Designated Commission employee. § 1018.23 Section § 1018.23 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ADVISORY COMMITTEE MANAGEMENT Operation of Advisory Committees § 1018.23 Designated Commission employee. (a) The Chairman shall...

  15. 16 CFR 1018.23 - Designated Commission employee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Designated Commission employee. 1018.23 Section 1018.23 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL ADVISORY COMMITTEE MANAGEMENT Operation of Advisory Committees § 1018.23 Designated Commission employee. (a) The Chairman shall...

  16. 75 FR 28849 - Notice of Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ...: Notice of public hearing and commission meeting. SUMMARY: The Susquehanna River Basin Commission will... the public hearing, the Commission will consider: (1) Action on certain water resources projects; (2) action on two projects involving a diversion; and (3) amendments to the current Regulatory Program Fee...

  17. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for Commission...

  18. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for Commission...

  19. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for Commission...

  20. 18 CFR 1b.8 - Requests for Commission investigations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Requests for Commission investigations. 1b.8 Section 1b.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES RULES RELATING TO INVESTIGATIONS § 1b.8 Requests for Commission...

  1. 76 FR 71558 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... From the Federal Register Online via the Government Publishing Office DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River... Delaware River Basin Commission fiscal year 2013 operating budget; and (c) a show cause hearing concerning...

  2. 78 FR 10160 - Notice of Commission Meeting and Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... From the Federal Register Online via the Government Publishing Office DELAWARE RIVER BASIN COMMISSION Notice of Commission Meeting and Public Hearing Notice is hereby given that the Delaware River Basin Commission will hold a public hearing on Tuesday, March 5, 2013. A business meeting will be held...

  3. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission...

  4. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission...

  5. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission...

  6. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission...

  7. 7 CFR 1780.48 - Regional commission grants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to ARC. RUS Bulletin 1780-23 will be used to develop a separate project management agreement between... Regional commission grants. Grants are sometimes made by regional commissions for projects eligible for RUS...) When RUS has funds in the project, no charge will be made for administering regional commission...

  8. 75 FR 24692 - Meeting of the Ozone Transport Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... AGENCY Meeting of the Ozone Transport Commission AGENCY: Environmental Protection Agency (EPA). ACTION... Annual Meeting of the Ozone Transport Commission (OTC). This OTC meeting will explore options available for reducing ground-level ozone precursors in a multi-pollutant context. The Commission will...

  9. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to...

  10. 25 CFR 556.5 - Report to Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... official or a key employee, the tribe shall forward to the Commission a completed application containing... primary management official or to a key employee, a tribe shall forward to the Commission an investigative... (4) The bases for those conclusions. (c) When a tribe forwards its report to the Commission, it shall...

  11. 25 CFR 556.5 - Report to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... official or a key employee, the tribe shall forward to the Commission a completed application containing... primary management official or to a key employee, a tribe shall forward to the Commission an investigative... (4) The bases for those conclusions. (c) When a tribe forwards its report to the Commission, it shall...

  12. 25 CFR 556.5 - Report to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... official or a key employee, the tribe shall forward to the Commission a completed application containing... primary management official or to a key employee, a tribe shall forward to the Commission an investigative... (4) The bases for those conclusions. (c) When a tribe forwards its report to the Commission, it shall...

  13. 75 FR 3488 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... National Park Service Flight 93 National Memorial Advisory Commission AGENCY: National Park Service. ACTION... meeting of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be... with the Flight 93 Memorial Task Force. Location: The meeting will be held at the Somerset County...

  14. 77 FR 24220 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... National Park Service Flight 93 National Memorial Advisory Commission AGENCY: National Park Service... meeting of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be... the Flight 93 National Memorial Office, 109 West Main Street, Suite 104, Somerset, PA 15501. Agenda...

  15. 16 CFR 456.4 - Declaration of Commission Intent.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Declaration of Commission Intent. 456.4 Section 456.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES OPHTHALMIC PRACTICE RULES (EYEGLASS RULE) § 456.4 Declaration of Commission Intent. In prohibiting the use of waivers...

  16. 16 CFR 456.4 - Declaration of Commission Intent.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Declaration of Commission Intent. 456.4 Section 456.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES OPHTHALMIC PRACTICE RULES (EYEGLASS RULE) § 456.4 Declaration of Commission Intent. In prohibiting the use of waivers...

  17. 16 CFR 456.4 - Declaration of Commission Intent.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Declaration of Commission Intent. 456.4 Section 456.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES OPHTHALMIC PRACTICE RULES (EYEGLASS RULE) § 456.4 Declaration of Commission Intent. In prohibiting the use of waivers...

  18. 16 CFR 456.4 - Declaration of Commission Intent.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Declaration of Commission Intent. 456.4 Section 456.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES OPHTHALMIC PRACTICE RULES (EYEGLASS RULE) § 456.4 Declaration of Commission Intent. In prohibiting the use of waivers...

  19. 16 CFR 456.4 - Declaration of Commission Intent.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Declaration of Commission Intent. 456.4 Section 456.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES OPHTHALMIC PRACTICE RULES (EYEGLASS RULE) § 456.4 Declaration of Commission Intent. In prohibiting the use of waivers...

  20. 78 FR 21060 - Appeal Proceedings Before the Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... standards from those required by the Commission's minimum internal control standards contained in part 543... adoption of alternate standards from those required by the Commission's minimum internal control standards... TGRAs' adoption of alternate standards from those required by the Commission's minimum internal...

  1. 47 CFR 0.420 - Other Commission publications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications...

  2. 47 CFR 0.420 - Other Commission publications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications...

  3. 47 CFR 0.420 - Other Commission publications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications...

  4. 47 CFR 0.420 - Other Commission publications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications...

  5. 18 CFR 388.104 - Informal advice from Commission staff.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY PROCEDURAL RULES INFORMATION AND REQUESTS § 388.104 Informal advice from... public and facilitate the accomplishment of the Commission's functions. Inquiries may be directed to...

  6. 18 CFR 388.104 - Informal advice from Commission staff.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY PROCEDURAL RULES INFORMATION AND REQUESTS § 388.104 Informal advice from... public and facilitate the accomplishment of the Commission's functions. Inquiries may be directed to...

  7. 77 FR 8257 - Sunshine Act Open Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... From the Federal Register Online via the Government Publishing Office FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Open Commission Meeting Date: February 8, 2012. The Federal Communications Commission... strictly limited instances. 2..... Wireless Tele- Title: Amendment of Parts 1 and 22 of the Communications...

  8. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Commenting § 51.124 Commission duty to comment. It is the policy of the Commission to comment on...

  9. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Commenting § 51.124 Commission duty to comment. It is the policy of the Commission to comment on...

  10. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Commenting § 51.124 Commission duty to comment. It is the policy of the Commission to comment on...

  11. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Commenting § 51.124 Commission duty to comment. It is the policy of the Commission to comment on...

  12. 10 CFR 51.124 - Commission duty to comment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) Commenting § 51.124 Commission duty to comment. It is the policy of the Commission to comment on...

  13. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... of the Secretary Military Leadership Diversity Commission Meeting AGENCY: Office of the Under...: Military Leadership Diversity Commission (MLDC). 2. Date: January 13, 2011 through January 14, 2011. 3...: The purpose of the meeting is for the commissioners of the Military Leadership Diversity Commission...

  14. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA)...

  15. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets...

  16. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to...

  17. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to...

  18. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  19. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  20. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  1. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  2. 19 CFR 213.5 - Access to Commission resources.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213... IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in addition to the Office's resources, are available to an eligible small business to the same extent as...

  3. 36 CFR 401.8 - Requirement for Commission approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MONUMENTS AND MEMORIALS § 401.8 Requirement for Commission approval. No administrative agency of the United States Government may give assistance to build a memorial unless the plan for the memorial has been approved by the Commission. In deciding whether to approve a memorial request the Commission will apply...

  4. 36 CFR 401.8 - Requirement for Commission approval.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MONUMENTS AND MEMORIALS § 401.8 Requirement for Commission approval. No administrative agency of the United States Government may give assistance to build a memorial unless the plan for the memorial has been approved by the Commission. In deciding whether to approve a memorial request the Commission will apply...

  5. 17 CFR 170.15 - Futures commission merchants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Futures commission merchants. 170.15 Section 170.15 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION REGISTERED FUTURES ASSOCIATIONS Membership in a Registered Futures Association § 170.15 Futures commission...

  6. 28 CFR 2.42 - Probation officer's reports to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Probation officer's reports to Commission... § 2.42 Probation officer's reports to Commission. A supervision report shall be submitted by the responsible probation officer to the Commission for each parolee after the completion of 24 months...

  7. 45 CFR 508.7 - Action by the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Action by the Commission. 508.7 Section 508.7 Public Welfare Regulations Relating to Public Welfare (Continued) FOREIGN CLAIMS SETTLEMENT COMMISSION OF... OF THE WAR CLAIMS ACT OF 1948, AS AMENDED HEARINGS § 508.7 Action by the Commission. After...

  8. 45 CFR 508.7 - Action by the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Action by the Commission. 508.7 Section 508.7 Public Welfare Regulations Relating to Public Welfare (Continued) FOREIGN CLAIMS SETTLEMENT COMMISSION OF... OF THE WAR CLAIMS ACT OF 1948, AS AMENDED HEARINGS § 508.7 Action by the Commission. After...

  9. 45 CFR 508.7 - Action by the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Action by the Commission. 508.7 Section 508.7 Public Welfare Regulations Relating to Public Welfare (Continued) FOREIGN CLAIMS SETTLEMENT COMMISSION OF... OF THE WAR CLAIMS ACT OF 1948, AS AMENDED HEARINGS § 508.7 Action by the Commission. After...

  10. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  11. 16 CFR 2.2 - Request for Commission action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Request for Commission action. 2.2 Section 2.2 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE NONADJUDICATIVE PROCEDURES Inquiries; Investigations; Compulsory Processes § 2.2 Request for Commission action. (a...

  12. 10 CFR 61.73 - Commission approval of proposals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Commission approval of proposals. 61.73 Section 61.73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Participation by State Governments and Indian Tribes § 61.73 Commission approval of proposals. (a...

  13. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  14. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  15. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE References § 401.26 Presentation to Commission. (a) Where a question or matter of difference arising...

  16. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE References § 401.26 Presentation to Commission. (a) Where a question or matter of difference arising...

  17. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  18. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE References § 401.26 Presentation to Commission. (a) Where a question or matter of difference arising...

  19. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its...

  20. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE References § 401.26 Presentation to Commission. (a) Where a question or matter of difference arising...

  1. 78 FR 16843 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... Commission (Commission or FERC) is submitting the information collection, FERC-730 (Report of Transmission... Commission, identified by the Docket No. IC13-9-000, by either of the following methods: eFiling at... of Transmission Investment Activity. OMB Control No.: 1902-0239 Type of Request: Three-year...

  2. 22 CFR 401.12 - Presentation to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Presentation to Commission. 401.12 Section 401.12 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE Applications § 401.12 Presentation to Commission. (a) Where one or the other of the Governments on its own...

  3. 22 CFR 401.26 - Presentation to Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Presentation to Commission. 401.26 Section 401.26 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE... Canada is to be referred to the Commission under Article IX of the Treaty, the method of brining such...

  4. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission. The...

  5. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission. The...

  6. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission. The...

  7. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission. The...

  8. 16 CFR 4.8 - Costs for obtaining Commission records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Costs for obtaining Commission records. 4.8 Section 4.8 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE MISCELLANEOUS RULES § 4.8 Costs for obtaining Commission records. (a) Definitions. For the purpose of...

  9. 12 CFR 268.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 4 2013-01-01 2013-01-01 false Compliance with final Commission decisions. 268... Compliance with final Commission decisions. (a) Relief ordered in a final Commission decision, if accepted pursuant to § 268.405(c) as a final decision, or not acted upon the Board within the time periods of §...

  10. 12 CFR 268.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 4 2014-01-01 2014-01-01 false Compliance with final Commission decisions. 268... Compliance with final Commission decisions. (a) Relief ordered in a final Commission decision, if accepted pursuant to § 268.405(c) as a final decision, or not acted upon the Board within the time periods of §...

  11. 29 CFR 1614.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Compliance with final Commission decisions. 1614.502... Commission decisions. (a) Relief ordered in a final Commission decision is mandatory and binding on the... continuing beyond the date of the request for reconsideration, and when the decision orders...

  12. 12 CFR 268.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Compliance with final Commission decisions. 268... with final Commission decisions. (a) Relief ordered in a final Commission decision, if accepted pursuant to § 268.405(c) as a final decision, or not acted upon the Board within the time periods of §...

  13. 12 CFR 268.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Compliance with final Commission decisions. 268... with final Commission decisions. (a) Relief ordered in a final Commission decision, if accepted pursuant to § 268.405(c) as a final decision, or not acted upon the Board within the time periods of §...

  14. 29 CFR 1614.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Compliance with final Commission decisions. 1614.502... Commission decisions. (a) Relief ordered in a final Commission decision is mandatory and binding on the... continuing beyond the date of the request for reconsideration, and when the decision orders...

  15. 12 CFR 268.502 - Compliance with final Commission decisions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 4 2012-01-01 2012-01-01 false Compliance with final Commission decisions. 268... Compliance with final Commission decisions. (a) Relief ordered in a final Commission decision, if accepted pursuant to § 268.405(c) as a final decision, or not acted upon the Board within the time periods of §...

  16. 16 CFR 2.2 - Request for Commission action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Request for Commission action. 2.2 Section 2.2 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE NONADJUDICATIVE PROCEDURES Inquiries; Investigations; Compulsory Processes § 2.2 Request for Commission action. (a...

  17. 16 CFR 2.2 - Request for Commission action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Request for Commission action. 2.2 Section 2.2 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE NONADJUDICATIVE PROCEDURES Inquiries; Investigations; Compulsory Processes § 2.2 Request for Commission action. (a...

  18. 78 FR 70959 - Commission on Indian Trust Administration and Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... Office of the Secretary Commission on Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of Renewal of the Commission on Indian Trust Administration and Reform... Secretary of the Interior is renewing the Commission on Indian Trust Administration and Reform. FOR...

  19. 78 FR 3325 - Appointing Authority for Military Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... of the Secretary 32 CFR Part 18 Appointing Authority for Military Commissions AGENCY: Department of... Authority for Military Commissions. This rule pertains to a military function of the United States and is.... As a result of the enactment of Military Commissions Act of 2009, the Deputy Secretary's issuance of...

  20. 25 CFR 700.473 - Administrative expenditures of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Administrative expenditures of the Commission. 700.473 Section 700.473 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.473 Administrative expenditures of the Commission....