40 CFR 75.62 - Monitoring plan submittals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...
50 CFR 216.275 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...
50 CFR 216.175 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...
Monitored execution of robot plans produced by STRIPS.
NASA Technical Reports Server (NTRS)
Fikes, R. E.
1972-01-01
We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... techniques, provisions for the establishment and operation of appropriate devices necessary to collect data... information.) Ambient air quality monitoring data for the 3-year period must meet a data completeness requirement. The ambient air quality monitoring data completeness requirement is met when the percent of days...
Execution monitoring for a mobile robot system
NASA Technical Reports Server (NTRS)
Miller, David P.
1990-01-01
Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.
Bragg, Heather M.; Johnston, Matthew W.
2016-04-15
All quality-assurance values exceed the criteria established by the U.S. Army Corps of Engineers TDG monitoring plan. Criteria for data completeness (95-percent) were met at seven of the eight monitoring stations. Deleted data at the John Day tailwater station resulted in data completeness below criteria.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
... devices necessary to collect data on ambient air quality, and programs to enforce the limitations. General...-hour ozone NAAQS, based on the most recent three years of complete, quality assured monitoring data... air quality monitoring data for the 3-year period must meet a data completeness requirement. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... based on complete, quality-assured and certified ambient air quality monitoring data for 2007-2009... certain air quality monitoring data because they meet the criteria for ozone exceptional events that are... certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data show...
40 CFR 98.447 - Records that must be retained.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Quarterly records of CO2 received, including mass flow rate of contents of containers (mass or volumetric... specified for retention in your EPA-approved MRV plan. (b) You must complete your monitoring plans, as...
40 CFR 98.447 - Records that must be retained.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Quarterly records of CO2 received, including mass flow rate of contents of containers (mass or volumetric... specified for retention in your EPA-approved MRV plan. (b) You must complete your monitoring plans, as...
40 CFR 98.447 - Records that must be retained.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Quarterly records of CO2 received, including mass flow rate of contents of containers (mass or volumetric... specified for retention in your EPA-approved MRV plan. (b) You must complete your monitoring plans, as...
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
Temperate non-breeding surveys - a key to shorebird conservation
Sue Thomas
2005-01-01
Completion of the United States and Canadian shorebird conservation plans recently identified and prioritized shorebird monitoring, management, and conservation needs in the Western Hemisphere. We present an emerging approach to monitor shorebird use of temperate non-breeding areas under the Program for Regional and International Shorebird Monitoring (PRISM). This...
Bragg, Heather M.; Johnston, Matthew W.
2015-01-01
All quality-assurance values exceed the criteria established by the U.S. Army Corps of Engineers TDG monitoring plan. Criteria for data completeness (95 percent) were met at six of the eight monitoring stations. Deleted data at the John Day tailwater station and missed transmissions at the Camas station resulted in data completeness below criteria.
40 CFR 98.447 - Records that must be retained.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Quarterly records of CO2 received, including mass flow rate of contents of containers (mass or volumetric... retention in your EPA-approved MRV plan. (b) You must complete your monitoring plans, as described in § 98.3...
Disease management to promote blood pressure control among African Americans.
Brennan, Troyen; Spettell, Claire; Villagra, Victor; Ofili, Elizabeth; McMahill-Walraven, Cheryl; Lowy, Elizabeth J; Daniels, Pamela; Quarshie, Alexander; Mayberry, Robert
2010-04-01
African Americans have a higher prevalence of hypertension and poorer cardiovascular and renal outcomes than white Americans. The objective of this study was to determine whether a telephonic nurse disease management (DM) program designed for African Americans is more effective than a home monitoring program alone to increase blood pressure (BP) control among African Americans enrolled in a national health plan. A prospective randomized controlled study (March 2006-December 2007) was conducted, with 12 months of follow-up on each subject. A total of 5932 health plan members were randomly selected from the population of self-identified African Americans, age 23 and older, in health maintenance organization plans, with hypertension; 954 accepted, 638 completed initial assessment, and 485 completed follow-up assessment. The intervention consisted of telephonic nurse DM (intervention group) including educational materials, lifestyle and diet counseling, and home BP monitor vs. home BP monitor alone (control group). Measurements included proportion with BP < 120/80, mean systolic BP, mean diastolic BP, and frequency of BP self-monitoring. Results revealed that systolic BP was lower in the intervention group (adjusted means 123.6 vs. 126.7 mm Hg, P = 0.03); there was no difference for diastolic BP. The intervention group was 50% more likely to have BP in control (odds ratio [OR] = 1.50, 95% confidence interval [CI] 0.997-2.27, P = 0.052) and 46% more likely to monitor BP at least weekly (OR 1.46, 95% CI 1.07-2.00, P = 0.02) than the control group. A nurse DM program tailored for African Americans was effective at decreasing systolic BP and increasing the frequency of self-monitoring of BP to a greater extent than home monitoring alone. Recruitment and program completion rates could be improved for maximal impact.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... completeness criteria for 2010 is incorrect. As explained in the TSD, the missing data from the primary monitor..., appendix N. Missing data from a primary monitor at a site does not necessarily mean that the data at the monitoring site is incomplete. When data from a collocated monitor is used to substitute for missing data at...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... completeness requirement for one or more quarters during 2009-2011. EPA addressed the missing data of each of...-assured, quality-controlled and certified ambient air monitoring data for the 2008-2010 and 2009-2011...- assured, quality-controlled, and certified monitoring data for the 2007-2009 monitoring period, that the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... requirement, monitoring sites ID 42-003-0093 (North Park) and ID 42- 003-0095 (Moon) have missing data for the... monitoring periods 2007-2009 and 2008-2010, EPA has addressed the missing data by applying a recently... based upon complete, quality-assured and certified ambient air monitoring data for the 2008-2010 period...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tsosie, Bernadette; Johnson, Richard
Groundwater samples were collected from monitoring wells at the Bluewater, New Mexico, Disposal Site to monitor groundwater contaminants as specified in the 1997 Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site Near Grants, New Mexico (LTSP). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location HMC-951. Alluvium wells are completed in the alluvial sediments in the former channel of the Rio San Jose, which was covered by basalt lava flows known asmore » the El Malpais, and are identified by the suffix (M). Bedrock wells are completed in the San Andres Limestone/Glorieta Sandstone hydrologic unit (San Andres aquifer) and are identified by the suffix (SG). Wells HMC-951 and OBS-3 are also completed in the San Andres aquifer. The LTSP requires monitoring for molybdenum, selenium, uranium, and polychlorinated biphenyls (PCBs); PCB monitoring occurs only during November sampling events. This event included sampling for an expanded list of analytes to characterize the site aquifers and to support a regional groundwater investigation being conducted by the New Mexico Environment Department.« less
Monitoring bird populations in small geographic areas
Dunn, Erica H.; Bart, J.; Collins, B.T.; Craig, B.; Dale, B.; Downes, C.M.; Francis, C.M.; Woodley, S.; Zorn, P.
2006-01-01
Numerous methods exist for monitoring bird populations, and there is a large literature describing them. There are few resources, however, that provide comprehensive advice on every step of organizing and carrying out a survey, from the early stages of planning to final use of the data. Even fewer resources are designed to meet the needs of a wide variety of potential users, from amateurs interested in change of bird life in a local study preserve to professionals testing hypotheses on the response of birds to habitat management, although much of the advice should be the same for every monitoring program. Whether survey objectives are very modest or rigorously scientific, samples must be sufficiently numerous and well distributed to provide meaningful results, and the survey should be well designed to ensure that the money and effort going into it are not wasted. This document is intended to be a complete resource for anyone planning to organize monitoring of noncolonial landbirds within a relatively small geographic area (e.g., from the size of a woodlot to a large park). The first of its two parts provides background explaining the importance of good study design and gives specific advice on all aspects of project planning and execution of high-quality data collection for the purpose of hypothesis testing. The second part is self-contained and nontechnical and describes complete plans for a site-specific checklist survey, suitable for addressing monitoring questions frequently asked by amateurs and for involvement of volunteers in data collection. Throughout are references to additional resources, from background literature to sources of existing survey protocols, analysis software, and tools for archiving data.
Disease Management to Promote Blood Pressure Control Among African Americans
Brennan, Troyen; Villagra, Victor; Ofili, Elizabeth; McMahill-Walraven, Cheryl; Lowy, Elizabeth J.; Daniels, Pamela; Quarshie, Alexander; Mayberry, Robert
2010-01-01
Abstract African Americans have a higher prevalence of hypertension and poorer cardiovascular and renal outcomes than white Americans. The objective of this study was to determine whether a telephonic nurse disease management (DM) program designed for African Americans is more effective than a home monitoring program alone to increase blood pressure (BP) control among African Americans enrolled in a national health plan. A prospective randomized controlled study (March 2006—December 2007) was conducted, with 12 months of follow-up on each subject. A total of 5932 health plan members were randomly selected from the population of self-identified African Americans, age 23 and older, in health maintenance organization plans, with hypertension; 954 accepted, 638 completed initial assessment, and 485 completed follow-up assessment. The intervention consisted of telephonic nurse DM (intervention group) including educational materials, lifestyle and diet counseling, and home BP monitor vs. home BP monitor alone (control group). Measurements included proportion with BP < 120/80, mean systolic BP, mean diastolic BP, and frequency of BP self-monitoring. Results revealed that systolic BP was lower in the intervention group (adjusted means 123.6 vs. 126.7 mm Hg, P = 0.03); there was no difference for diastolic BP. The intervention group was 50% more likely to have BP in control (odds ratio [OR] = 1.50, 95% confidence interval [CI] 0.997–2.27, P = 0.052) and 46% more likely to monitor BP at least weekly (OR 1.46, 95% CI 1.07–2.00, P = 0.02) than the control group. A nurse DM program tailored for African Americans was effective at decreasing systolic BP and increasing the frequency of self-monitoring of BP to a greater extent than home monitoring alone. Recruitment and program completion rates could be improved for maximal impact. (Population Health Management 2010;13:65–72) PMID:20415618
MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laub, S; Dunn, M; Galbreath, G
2015-06-15
Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less
Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H
2014-01-01
Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346
Code of Federal Regulations, 2010 CFR
2010-07-01
... initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of 40 CFR part 60. Complete this evaluation by 180 days after your final compliance... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS...
Site Rehabilitation Completion Report with No Further Action Proposal for the Northeast Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel, Joe; Tabor, Charles; Survochak, Scott
2013-05-01
The purpose of this Site Rehabilitation Completion Report is to present the post-active-remediation monitoring results for the Northeast Site and to propose No Further Action with Controls. This document includes information required by Chapter 62-780.750(4)(d), 62-780.750(6), and 62-780.600(8)(a)27 Florida Administrative Code (F.A.C.). The Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site (DOE 2009a) describes the approach for post-active-remediation monitoring. The Young - Rainey Science, Technology, and Research Center (STAR Center) is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 99-acre STAR Center is located in Largo, Florida. The Northeast Site is locatedmore » in the northeast corner of the STAR Center. The Northeast Site meets all the requirements for an RMO II closure—No Further Action with Controls. DOE is nearing completion of a restrictive covenant for the Northeast Site. DOE has completed post-active-remediation monitoring at the Northeast Site as of September 2012. No additional monitoring will be conducted.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Dick; Tsosie, Bernadette
Groundwater samples were collected from monitoring wells at the Bluewater, New Mexico, Disposal Site to monitor groundwater contaminants as specified in the 1997 Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site Near Grants, New Mexico (LTSP). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). Duplicate samples were collected from locations 14(SG) and 21(M). Sampling originally scheduled for the week of May 11, 2015 was interrupted by heavy rainfall and later completed in June.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, K.; Tsai, H.; Decision and Information Sciences
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less
L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
2008-09-30
This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.
Assessing the quality of data aggregated by antiretroviral treatment clinics in Malawi.
Makombe, Simon D; Hochgesang, Mindy; Jahn, Andreas; Tweya, Hannock; Hedt, Bethany; Chuka, Stuart; Yu, Joseph Kwong-Leung; Aberle-Grasse, John; Pasulani, Olesi; Bailey, Christopher; Kamoto, Kelita; Schouten, Erik J; Harries, Anthony D
2008-04-01
As national antiretroviral treatment (ART) programmes scale-up, it is essential that information is complete, timely and accurate for site monitoring and national planning. The accuracy and completeness of reports independently compiled by ART facilities, however, is often not known. This study assessed the quality of quarterly aggregate summary data for April to June 2006 compiled and reported by ART facilities ("site report") as compared to the "gold standard" facility summary data compiled independently by the Ministry of Health supervision team ("supervision report"). Completeness and accuracy of key case registration and outcome variables were compared. Data were considered inaccurate if variables from the site reports were missing or differed by more than 5% from the supervision reports. Additionally, we compared the national summaries obtained from the two data sources. Monitoring and evaluation of Malawi's national ART programme is based on WHO's recommended tools for ART monitoring. It includes one master card for each ART patient and one patient register at each ART facility. Each quarter, sites complete cumulative cohort analyses and teams from the Ministry of Health conduct supervisory visits to all public sector ART sites to ensure the quality of reported data. Most sites had complete case registration and outcome data; however many sites did not report accurate data for several critical data fields, including reason for starting, outcome and regimen. The national summary using the site reports resulted in a 12% undercount in the national total number of persons on first-line treatment. Several facility-level characteristics were associated with data quality. While many sites are able to generate complete data summaries, the accuracy of facility reports is not yet adequate for national monitoring. The Ministry of Health and its partners should continue to identify and support interventions such as supportive supervision to build sites' capacity to maintain and compile quality data to ensure that accurate information is available for site monitoring and national planning.
NASA Astrophysics Data System (ADS)
Kurui, P. K.; Mutua, F.
2016-12-01
The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.
Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-10-01
The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content ofmore » RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ``as low as reasonably achievable`` (ALARA).« less
IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.
40 CFR 98.477 - Records that must be retained.
Code of Federal Regulations, 2012 CFR
2012-07-01
... or contents of containers (mass or volumetric) at standard conditions and operating conditions... for at least 3 years. (b) You must complete your monitoring plans, as described in § 98.3(g)(5), by...
40 CFR 98.477 - Records that must be retained.
Code of Federal Regulations, 2014 CFR
2014-07-01
... or contents of containers (mass or volumetric) at standard conditions and operating conditions... for at least 3 years. (b) You must complete your monitoring plans, as described in § 98.3(g)(5), by...
40 CFR 98.477 - Records that must be retained.
Code of Federal Regulations, 2013 CFR
2013-07-01
... or contents of containers (mass or volumetric) at standard conditions and operating conditions... for at least 3 years. (b) You must complete your monitoring plans, as described in § 98.3(g)(5), by...
40 CFR 98.477 - Records that must be retained.
Code of Federal Regulations, 2011 CFR
2011-07-01
... or contents of containers (mass or volumetric) at standard conditions and operating conditions... for at least 3 years. (b) You must complete your monitoring plans, as described in § 98.3(g)(5), by...
Chapter 10. Developing a habitat monitoring program: three examples from national forest planning
Michael I. Goldstein; Lowell H. Suring; Christina D. Vojta; Mary M. Rowland; Clinton. McCarthy
2013-01-01
This chapter reviews the process steps of wildlife habitat monitoring described in chapters 2 through 9 and provides three case examples that illustrate how the process steps apply to specific situations. It provides the reader an opportunity to synthesize the material while also revealing the potential knowledge gaps and pitfalls that may complicate completion of a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... missing data. The linear regression relationship is based on time periods in which both monitors were... fill in missing data for the incomplete monitor, so that the normal data completeness requirement of 75 percent of data in each quarter of the three years is met. After the missing data for the site is filled...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus
A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.
Long-Term Pavement Performance Program
DOT National Transportation Integrated Search
2015-12-01
The LTPP program will yield additional benefits as data are added to the database and as data analysis effortssome currently planned and some yet to be identifiedare completed. Continued monitoring of the test sections that remain in service is...
We expect to successfully install and monitor 3 MFPs, to establish a local fabrication plan for the modification kits, to complete pilot testing of SMS based improved data collection techniques, and to increase jatropha mobilization in 20 farming cooperatives.
THE DETROIT EXPOSURE AND AEROSOL RESEARCH STUDY (DEARS)
Field data collections for the Detroit Exposure and Aerosol Research Study (DEARS) have completed one-half of the planned study design. The DEARS is collecting personal, residential indoor, residential outdoor and central community monitoring data involving particulate matter, v...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cash, R.J.; Dukelow, G.T.; Forbes, C.J.
1993-03-01
This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285{degrees}C (545{degrees}F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities thatmore » were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first ofmore » a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12) experimental design and decision making with uncertainty.« less
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
Nurmi, Johanna; Hagger, Martin S; Haukkala, Ari; Araújo-Soares, Vera; Hankonen, Nelli
2016-04-01
This study tested the predictive validity of a multitheory process model in which the effect of autonomous motivation from self-determination theory on physical activity participation is mediated by the adoption of self-regulatory techniques based on control theory. Finnish adolescents (N = 411, aged 17-19) completed a prospective survey including validated measures of the predictors and physical activity, at baseline and after one month (N = 177). A subsample used an accelerometer to objectively measure physical activity and further validate the physical activity self-report assessment tool (n = 44). Autonomous motivation statistically significantly predicted action planning, coping planning, and self-monitoring. Coping planning and self-monitoring mediated the effect of autonomous motivation on physical activity, although self-monitoring was the most prominent. Controlled motivation had no effect on self-regulation techniques or physical activity. Developing interventions that support autonomous motivation for physical activity may foster increased engagement in self-regulation techniques and positively affect physical activity behavior.
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites
Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.
2016-01-01
Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.
Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette
2014-01-01
The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.
Schneider, Tiffany Rae; McFarland, W.D.
1996-01-01
A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
TPS In-Flight Health Monitoring Project Progress Report
NASA Technical Reports Server (NTRS)
Kostyk, Chris; Richards, Lance; Hudston, Larry; Prosser, William
2007-01-01
Progress in the development of new thermal protection systems (TPS) is reported. New approaches use embedded lightweight, sensitive, fiber optic strain and temperature sensors within the TPS. Goals of the program are to develop and demonstrate a prototype TPS health monitoring system, develop a thermal-based damage detection algorithm, characterize limits of sensor/system performance, and develop ea methodology transferable to new designs of TPS health monitoring systems. Tasks completed during the project helped establish confidence in understanding of both test setup and the model and validated system/sensor performance in a simple TPS structure. Other progress included complete initial system testing, commencement of the algorithm development effort, generation of a damaged thermal response characteristics database, initial development of a test plan for integration testing of proven FBG sensors in simple TPS structure, and development of partnerships to apply the technology.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
...EPA is proposing to determine that the Birmingham, Alabama, nonattainment area for the 2006 24-hour fine particulate matter (PM2.5) National Ambient Air Quality Standard (NAAQS) has attained the 2006 24-hour PM2.5 NAAQS. This proposed determination is based upon complete, quality assured, quality controlled, and certified ambient air monitoring data for the years 2007-2009 showing that this area has monitored attainment of the 2006 24-hour PM2.5 NAAQS. If this proposed determination is made final, the requirement for the State of Alabama to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plans (SIPs) related to attainment of the 2006 24-hour PM2.5 standard for the Birmingham, Alabama, PM2.5 nonattainment area, shall be suspended for as long as this area continues to meet the 2006 24-hour PM2.5 NAAQS.
NASA Technical Reports Server (NTRS)
Braman, Julia M. B.; Wagner, David A.
2010-01-01
Safe human exploration in space missions requires careful management of limited resources such as breathable air and stored electrical energy. Daily activities for astronauts must be carefully planned with respect to such resources, and usage must be monitored as activities proceed to ensure that they can be completed while maintaining safe resource margins. Such planning and monitoring can be complex because they depend on models of resource usage, the activities being planned, and uncertainties. This paper describes a system - and the technology behind it - for energy management of the NASA-Johnson Space Center's Multi-Mission Space Exploration Vehicles (SEV), that provides, in an onboard advisory mode, situational awareness to astronauts and real-time guidance to mission operators. This new capability was evaluated during this year's Desert RATS (Research and Technology Studies) planetary exploration analog test in Arizona. This software aided ground operators and crew members in modifying the day s activities based on the real-time execution of the plan and on energy data received from the rovers.
Learning from conservation planning for the U.S. National Wildlife Refuges.
Meretsky, Vicky J; Fischman, Robert L
2014-10-01
The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation effectiveness. Excellent examples of all recommended practices exist within the CCPs we examined; sharing best planning practices would improve planning efficiency within the refuge system. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.
Estimating total population size for Songbirds
Jonathan Bart
2005-01-01
A conviction has developed during the past few years within the avian conservation community that estimates of total population size are needed for many species, especially ones that warrant conservation action. For example, the recently completed monitoring plans for North American shorebirds and landbirds establish estimating population size as a major objective....
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suber, Gregory
2012-07-01
In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less
40 CFR 74.61 - Monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert
2015-05-01
Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2014 CFR
2014-10-01
... by BLM to protect public lands. (5) Concurrent reclamation. You must initiate and complete... migration controls do not prove effective. You are responsible for any costs associated with water treatment... containment system that will minimize the release of leaching solutions to the environment. You must monitor...
43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?
Code of Federal Regulations, 2011 CFR
2011-10-01
... by BLM to protect public lands. (5) Concurrent reclamation. You must initiate and complete... migration controls do not prove effective. You are responsible for any costs associated with water treatment... containment system that will minimize the release of leaching solutions to the environment. You must monitor...
DOT National Transportation Integrated Search
2007-10-01
This report covers the Phase A and B activities of Research Project SPR 627 for the Arizona Department of Transportation (ADOT). Phase C is planned as a separate research activity and is anticipated to begin in the near term, following the completion...
Brian Buma; Jennifer K Costanza; Kurt Riitters
2017-01-01
The scale of investigation for disturbanceinfluenced processes plays a critical role in theoretical assumptions about stability, variance, and equilibrium, as well as conservation reserve and long-term monitoring program design. Critical consideration of scale is required for robust planning designs, especially when anticipating future disturbances whose exact...
Mission Operations of the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel
2007-01-01
A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.
NASA Technical Reports Server (NTRS)
Johnson, Jill W. (Compiler)
2015-01-01
This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.
Sitewide monitoring at Agra, Kansas, June 2009.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
In 1985, carbon tetrachloride was discovered in the groundwater at Agra, Kansas, during routine sampling of public water supply wells. Two of Agra's four public water supply wells contained low but detectable levels of carbon tetrachloride; the concentrations in wells PWS-3 and PWS-4 exceeded the maximum contaminant level. These wells were removed from service in 1986, although they remain available for uses other than drinking water. Other public wells, outside the area of contamination, supply drinking water for the city of Agra. In 1987-2005, the Kansas Department of Health and Environment (KDHE) and the Commodity Credit Corporation of the U.S.more » Department of Agriculture (CCC/USDA) conducted investigations to delineate the contaminant plume and to identify source areas for the contamination - which results from the past use of grain fumigants containing carbon tetrachloride. Source areas were identified on the former CCC/USDA grain storage facility property and on the Producers Agricultural Marketing Association, Inc., property located to the south (Argonne 2006). The contaminant plume extends to the southeast, toward well PWS-3, from the identified source areas. Both the CCC/USDA and Pro-Ag Marketing are currently implementing KDHE-approved interim measures (IMs). To address the contamination identified on its former property, the CCC/USDA is implementing a source control IM consisting of large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). Pro-Ag Marketing plans to use groundwater extraction to address the downgradient plume. The CCC/USDA and Pro-Ag completed installation of the two interim measures in May 2009 and August 2009, respectively. The performance and assessments of the effectiveness of the IMs are being reported separately by the responsible entities. As part of the IM process, the KDHE (2008) requested the development of a joint sitewide groundwater monitoring plan to allow periodic assessment of the effectiveness of the separate IMs being implemented by the CCC/USDA and Pro-Ag, through monitoring of the level of contamination and the resulting change in both the extent and internal configuration of the downgradient plume. A Joint Work Plan for Sitewide Monitoring was developed by the CCC/USDA through its technical consultant, Argonne National Laboratory, and was reviewed, approved, and signed by Pro-Ag Marketing and subsequently submitted to the KDHE on May 12, 2009. The KDHE (2009a) provided comments on the Joint Work Plan on May 27, 2009, requesting submission of a revised version. To minimize delays, the KDHE allowed the CCC/USDA to proceed with the scheduled annual sampling proposed in the Joint Work Plan. The sampling was to be conducted according to the previously approved low-flow sampling methodology (Argonne 2009). Argonne conducted the first annual sampling event for the CCC/USDA on June 15-16, 2009. The finalized, signed version of the Joint Work Plan provided to the KDHE on November 9, 2009, is in Appendix A. Table 1.1 lists the monitoring and public water supply wells to be sampled under the Joint Work Plan, plus the wells being sampled to monitor the respective IMs. The entity responsible for each monitoring element is indicated, along with well completion dates and well registration numbers. The subject of this report is the initial sitewide groundwater sampling event that occurred on June 15-16, 2009, under the Joint Work Plan.« less
Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3
NASA Technical Reports Server (NTRS)
Martinez, A.; Erickson, C.; Hines, B.
1986-01-01
Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.
2001-07-01
The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less
2015 Site Environmental Report Fernald Preserve
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hertel, Bill; Hooten, Gwen
The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater.more » During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.« less
Mosaly, Prithima R; Mazur, Lukasz M; Jones, Ellen L; Hoyle, Lesley; Zagar, Timothy; Chera, Bhishamjit S; Marks, Lawrence B
2013-01-01
To quantitatively assess the difference in workload and performance of radiation oncology physicians during radiation therapy treatment planning tasks under the conditions of "cross coverage" versus planning a patient with whom they were familiar. Eight physicians (3 experienced faculty physicians and 5 physician residents) performed 2 cases. The first case represented a "cross-coverage" scenario where the physicians had no prior information about the case to be planned. The second exposure represented a "regular-coverage" scenario where the physicians were familiar with the patient case to be planned. Each case involved 3 tasks to be completed systematically. Workload was assessed both subjectively (perceived) using National Aeronautics and Space Administration-Task Load Index (NASA-TLX), and objectively (physiological) throughout the task using eye data (via monitoring pupil size and blink rate). Performance of each task and the case was measured using completion time. Subjective willingness to approve or disapprove the generated plan was obtained after completion of the case only. Forty-eight perceived and 48 physiological workload assessments were obtained. Overall, results revealed a significant increase in perceived workload (high NASA-TLX score) and decrease in performance (longer completion time and reduced approval rate) during cross coverage. There were nonsignificant increases in pupil diameter and decreases in the blink rate during cross-coverage versus regular-coverage scenario. In both cross-coverage and regular-coverage scenarios the level of experience did not affect workload and performance. The cross-coverage scenario significantly increases perceived workload and degrades performance versus regular coverage. Hence, to improve patient safety, efforts must be made to develop policies, standard operating procedures, and usability improvements to electronic medical record and treatment planning systems for "easier" information processing to deal with cross coverage, while recognizing strengths and limitations of human performance. Published by Elsevier Inc.
A Comparison of Two Instructional Formats on Heart Rate Intensity and Skill Development.
ERIC Educational Resources Information Center
Quinn, Patrick B.; Strand, Brad
1995-01-01
This study examined the effect of adding aerobic training to football skills development activities for male seventh graders. Two groups completed one or the other type of training. Heart rate monitor and skill assessment data indicated that the addition of the planned fitness component did not detract from skill development. (SM)
Research and technology operating plan: A summary Fiscal Year 1974. [bibliography
NASA Technical Reports Server (NTRS)
1973-01-01
A compilation is presented of the summary portions of RTOPs used for management review and control of research. Citations and abstracts of RTOPs are included. A list is presented of RTOPs which have been changed, completed, or terminated since the last summary. Indexes presented include: subject, technical monitor, responsible NASA organization, and RTOP number.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
... monitoring plans; (2) a request for waivers of certain Integrated Licensing Process (ILP) regulations...Hydro Group Ltd., mounted on completely submerged gravity foundations; (2) two 250-meter service cables connected at a subsea junction box or spliced to a 0.5-kilometer subsea transmission cable, connecting to a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
... in EPA's Air Quality System (AQS) database. To account for missing data, the procedures found in... determination is based upon complete, certified, quality-assured ambient air quality monitoring data for the... proposing? II. What is the background for this proposed action? III. What is EPA's analysis of data for...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1994-02-01
This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaivoda, Alexis
2004-02-01
This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts,more » personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water sources on Evans Creek. Through this project, BPA funded the Middle Fork Irrigation District (MFID) a total of $194,000 in FY 03 for the Glacier Ditch- Evans Creek project. BPA funds accounted for approximately 30% of the project while the remaining 70% was cost-shared by the MFID, the US Forest Service, and the Oregon Watershed Enhancement Board. The MFID operated irrigation diversions on Evans Creek (Hutson pond RM 4.0 and the Evans Creek diversion RM 5.5), a tributary to the East Fork Hood River. Both diversions had inadequate upstream fish passage, and utilized Evans Creek to transport Eliot Branch water to distribute irrigation water lower in the basin. This project consisted of: piping a portion of the Glacier ditch to create a pressurized irrigation pipeline system, piping the Hutson extension, removing the culvert on Evans Creek near the Glacier ditch, removing the culvert above the Hutson pond, revegetating the disturbed areas, and providing adequate and approved fish passage on Evans Creek. Prior to any work, Brian Connors with MFID completed a NEPA checklist. Some of the key regulatory points of this project included wetland delineations, a cultural resources survey, and consultations with NOAA Fisheries, U.S. Fish and Wildlife, Oregon Department of Fish and Wildlife (ODFW), and the U.S. Army Corps of Engineers. This project will eliminate the overflow of silty water into Evans Creek and West Fork Evans Creek. Upon completion of this project, access to 2.5 miles of winter steelhead, coho salmon, and resident trout habitat will be restored. Elimination of the interbasin transfer of water will discontinue the conveyance of silty Eliot Branch water into clear East Fork tributaries. Additionally, less water taken from Coe Branch, Eliot Branch, and Laurance Lake which will benefit listed steelhead and bull trout. The Glacier Ditch provided irrigation water from the Eliot Branch to upper valley orchards and agriculture for more than 100 years. The Glacier Ditch served approximately 1,438 acres with 18 cfs of water. The Glacier Ditch portion of this project consisted of 12,000 feet of 24-inch HDPE pipe, and was installed in February and March of 2003. Most of this pipeline was installed in or along the Glacier Ditch. The pipe crossed Evans Creek near the concrete diversion. A wooddecked steel bridge will be built during the summer of 2004, to replace the culvert crossing. The bridge will enable Evans Creek to be restored to a natural flow pattern. The pond will be left to equalize with the hydrology of the area. The Hutson Extension phase of this project consisted of 4,330 feet of 48-inch HDPE pipe. This part of the project eliminated the need for the existing diversion and fish ladder at Hutson Pond. This pipe was installed during April 2003 and lies beneath the Evans Creek and West Fork Evans Creek stream channels (Figure 1). One culvert was removed at the Hutson Pond on Evans Creek (RM 3.3).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
...EPA is proposing to make two determinations regarding the tri- state Huntington-Ashland, West Virginia-Kentucky-Ohio fine particulate matter (PM2.5) nonattainment Area (hereafter referred to as ``the Huntington-Ashland Area'' or ``Area''). First, EPA is proposing to determine that the Area has attained the 1997 annual average PM2.5 National Ambient Air Quality Standard (NAAQS). This proposed determination of attainment is based upon complete, quality- assured and certified ambient air monitoring data for the 2007-2009 period showing that the Area has attained the 1997 annual PM2.5 NAAQS, and data available to date for 2010 in EPA's Air Quality System (AQS) database that show the area continues to attain. If EPA finalizes this proposed determination of attainment, the requirements for the Area to submit attainment demonstrations and associated reasonably available control measures (RACM), a reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standard shall be suspended for so long as the Area continues to attain the annual PM2.5 NAAQS. Second, EPA is also proposing to determine, based on quality-assured and certified monitoring data for the 2007-2009 monitoring period, that the Area has attained the 1997 annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010.
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
[Planning With Nanda, Noc, Nic Taxonomies In Neurologic Rehabilitation. A clinical study].
Iori, Alessandra; Foracchia, Marco; Gradellini, Cinzia
2015-01-01
Nursing classifications identify a specific professional responsibility, increase nursing visibility, according with nursing evolution of these last years. To evaluate care planning with NANDA taxonomy in neurologic rehabilitation context. Care plan managing with NANDA taxonomy, regarding diagnosis of constipation and impaired skin integrity, using a computerized tool for systematically observation, organized in check list. Registered data with taxonomy planning are higher in quantitative and qualitative terms. For most of patients (87%) one diagnosis has been opened, both diagnosis for 60% of them. Nursing care plan with NANDA taxonomy can be considered a valid methodology of care for neurologic patient, this since it requests a deep and complete registration of first assessment a systematically registration of each monitoring, it increases visibility of nursing job, and it underlines specific autonomy and responsibility in prevention and management of problems.
Hunter Ball, B; Pitães, Margarida; Brewer, Gene A
2018-02-07
Output monitoring refers to memory for one's previously completed actions. In the context of prospective memory (PM) (e.g., remembering to take medication), failures of output monitoring can result in repetitions and omissions of planned actions (e.g., over- or under-medication). To be successful in output monitoring paradigms, participants must flexibly control attention to detect PM cues as well as engage controlled retrieval of previous actions whenever a particular cue is encountered. The current study examined individual differences in output monitoring abilities in a group of younger adults differing in attention control (AC) and episodic memory (EM) abilities. The results showed that AC ability uniquely predicted successful cue detection on the first presentation, whereas EM ability uniquely predicted successful output monitoring on the second presentation. The current study highlights the importance of examining external correlates of PM abilities and contributes to the growing body of research on individual differences in PM.
40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...
Sentinel-4: the geostationary component of the GMES atmosphere monitoring missions
NASA Astrophysics Data System (ADS)
Bazalgette Courrèges-Lacoste, G.; Arcioni, M.; Meijer, Y.; Bézy, J.-L.; Bensi, P.; Langen, J.
2017-11-01
The implementation of operational atmospheric composition monitoring missions is foreseen in the context of the Global Monitoring for Environment and Security (GMES) initiative. Sentinel-4 will address the geostationary observations and Sentinel-5 the low Earth orbit ones. The two missions are planned to be launched on-board Eumetsat's Meteosat Third Generation (MTG) and Post-EPS satellites, respectively. This paper presents an overview of the GMES Sentinel- 4 mission, which has been assessed at Phase-0 level. It describes the key requirements and outlines the main aspects of the candidate implementation concepts available at completion of Phase-0. The paper will particularly focus on the observation mode, the estimated performance and the related technology developments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steve McRae; Thomas Walsh; Michael Dunn
2010-02-22
In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less
The ISIS project: Fault-tolerance in large distributed systems
NASA Technical Reports Server (NTRS)
Birman, Kenneth P.; Marzullo, Keith
1990-01-01
The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.
ERIC Educational Resources Information Center
Endedijk, Hinke; Denessen, Eddie; Hendriks, Angelique W.
2011-01-01
Despite the fact that homework forms an important cornerstone of student development, many students fail to capitalize on the long-term benefits of doing homework. Several executive skills, including cognitive flexibility, monitoring and planning are suggested as prerequisites for the completion of homework. It follows that homework difficulties…
Counihan, Timothy D.; Hardiman, Jill M.; Waste, Stephen
2013-01-01
Implementing an Integrated Status and Trends Monitoring program (ISTM) for the mainstem Columbia River will help identify trends in important natural resources and help us understand the long-term collective effects of management actions. In this report, we present progress towards the completion of a stepwise process that will facilitate the development of an ISTM for the mainstem Columbia River. We discuss planning and regulatory documents that can be used to identify monitoring goals and objectives and present existing monitoring and research activities that should be considered as the development of a Columbia River ISTM proceeds. We also report progress towards the development of sample frames for the Columbia and Snake Rivers and their floodplains. The sample frames were formulated using Digital Elevation Models (DEM’s) of the river channel and upland areas and a Generalized Random-Tessellation Stratified (GRTS) algorithm for an area based resource to generate “master sample(s).” Working with the Pacific Northwest Aquatic Monitoring Partnership (PNAMP) we facilitated the transfer of the sample frames to the PNAMP “Monitoring Sample Designer” tool. We then discuss aspects of response and survey designs as they pertain to the formulation of a mainstem Columbia River ISTM. As efforts to formulate an ISTM for the mainstem Columbia River proceed, practitioners should utilize the extensive literature describing the planning and implementation of fish and wildlife mitigation and recovery efforts in the Columbia River Basin. While we make progress towards establishing an ISTM framework, considerable work needs to be done to formulate an ISTM program for the mainstem Columbia River. Long-term monitoring programs have been established for other large rivers systems; scientists that have experience planning, implementing, and maintaining large river monitoring efforts such as those in the Colorado, Illinois, and Mississippi Rivers should be consulted and involved as efforts proceed.
ERIC Educational Resources Information Center
Jordan, Jerry Monroe; Roloff, Michael E.
1997-01-01
Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…
Wildlife mitigation and monitoring report Gunnison, Colorado, site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less
The Australasian Resuscitation in Sepsis Evaluation (ARISE) trial statistical analysis plan.
Delaney, Anthony P; Peake, Sandra L; Bellomo, Rinaldo; Cameron, Peter; Holdgate, Anna; Howe, Belinda; Higgins, Alisa; Presneill, Jeffrey; Webb, Steve
2013-09-01
The Australasian Resuscitation in Sepsis Evaluation (ARISE) study is an international, multicentre, randomised, controlled trial designed to evaluate the effectiveness of early goal-directed therapy compared with standard care for patients presenting to the emergency department with severe sepsis. In keeping with current practice, and considering aspects of trial design and reporting specific to non-pharmacological interventions, our plan outlines the principles and methods for analysing and reporting the trial results. The document is prepared before completion of recruitment into the ARISE study, without knowledge of the results of the interim analysis conducted by the data safety and monitoring committee and before completion of the two related international studies. Our statistical analysis plan was designed by the ARISE chief investigators, and reviewed and approved by the ARISE steering committee. We reviewed the data collected by the research team as specified in the study protocol and detailed in the study case report form. We describe information related to baseline characteristics, characteristics of delivery of the trial interventions, details of resuscitation, other related therapies and other relevant data with appropriate comparisons between groups. We define the primary, secondary and tertiary outcomes for the study, with description of the planned statistical analyses. We have developed a statistical analysis plan with a trial profile, mock-up tables and figures. We describe a plan for presenting baseline characteristics, microbiological and antibiotic therapy, details of the interventions, processes of care and concomitant therapies and adverse events. We describe the primary, secondary and tertiary outcomes with identification of subgroups to be analysed. We have developed a statistical analysis plan for the ARISE study, available in the public domain, before the completion of recruitment into the study. This will minimise analytical bias and conforms to current best practice in conducting clinical trials.
Monitoring data transfer latency in CMS computing operations
Bonacorsi, Daniele; Diotalevi, Tommaso; Magini, Nicolo; ...
2015-12-23
During the first LHC run, the CMS experiment collected tens of Petabytes of collision and simulated data, which need to be distributed among dozens of computing centres with low latency in order to make efficient use of the resources. While the desired level of throughput has been successfully achieved, it is still common to observe transfer workflows that cannot reach full completion in a timely manner due to a small fraction of stuck files which require operator intervention.For this reason, in 2012 the CMS transfer management system, PhEDEx, was instrumented with a monitoring system to measure file transfer latencies, andmore » to predict the completion time for the transfer of a data set. The operators can detect abnormal patterns in transfer latencies while the transfer is still in progress, and monitor the long-term performance of the transfer infrastructure to plan the data placement strategy.Based on the data collected for one year with the latency monitoring system, we present a study on the different factors that contribute to transfer completion time. As case studies, we analyze several typical CMS transfer workflows, such as distribution of collision event data from CERN or upload of simulated event data from the Tier-2 centres to the archival Tier-1 centres. For each workflow, we present the typical patterns of transfer latencies that have been identified with the latency monitor.We identify the areas in PhEDEx where a development effort can reduce the latency, and we show how we are able to detect stuck transfers which need operator intervention. Lastly, we propose a set of metrics to alert about stuck subscriptions and prompt for manual intervention, with the aim of improving transfer completion times.« less
Monitoring data transfer latency in CMS computing operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonacorsi, Daniele; Diotalevi, Tommaso; Magini, Nicolo
During the first LHC run, the CMS experiment collected tens of Petabytes of collision and simulated data, which need to be distributed among dozens of computing centres with low latency in order to make efficient use of the resources. While the desired level of throughput has been successfully achieved, it is still common to observe transfer workflows that cannot reach full completion in a timely manner due to a small fraction of stuck files which require operator intervention.For this reason, in 2012 the CMS transfer management system, PhEDEx, was instrumented with a monitoring system to measure file transfer latencies, andmore » to predict the completion time for the transfer of a data set. The operators can detect abnormal patterns in transfer latencies while the transfer is still in progress, and monitor the long-term performance of the transfer infrastructure to plan the data placement strategy.Based on the data collected for one year with the latency monitoring system, we present a study on the different factors that contribute to transfer completion time. As case studies, we analyze several typical CMS transfer workflows, such as distribution of collision event data from CERN or upload of simulated event data from the Tier-2 centres to the archival Tier-1 centres. For each workflow, we present the typical patterns of transfer latencies that have been identified with the latency monitor.We identify the areas in PhEDEx where a development effort can reduce the latency, and we show how we are able to detect stuck transfers which need operator intervention. Lastly, we propose a set of metrics to alert about stuck subscriptions and prompt for manual intervention, with the aim of improving transfer completion times.« less
Path planning and execution monitoring for a planetary rover
NASA Technical Reports Server (NTRS)
Gat, Erann; Slack, Marc G.; Miller, David P.; Firby, R. James
1990-01-01
A path planner and an execution monitoring planner that will enable the rover to navigate to its various destinations safely and correctly while detecting and avoiding hazards are described. An overview of the complete architecture is given. Implementation and testbeds are described. The robot can detect unforseen obstacles and take appropriate action. This includes having the rover back away from the hazard and mark the area as untraversable in the in the rover's internal map. The experiments have consisted of paths roughly 20 m in length. The architecture works with a large variety of rover configurations with different kinematic constraints.
Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric
2005-10-01
The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less
An Architecture for Autonomic Web Service Process Planning
NASA Astrophysics Data System (ADS)
Moore, Colm; Xue Wang, Ming; Pahl, Claus
Web service composition is a technology that has received considerable attention in the last number of years. Languages and tools to aid in the process of creating composite Web services have been received specific attention. Web service composition is the process of linking single Web services together in order to accomplish more complex tasks. One area of Web service composition that has not received as much attention is the area of dynamic error handling and re-planning, enabling autonomic composition. Given a repository of service descriptions and a task to complete, it is possible for AI planners to automatically create a plan that will achieve this goal. If however a service in the plan is unavailable or erroneous the plan will fail. Motivated by this problem, this paper suggests autonomous re-planning as a means to overcome dynamic problems. Our solution involves automatically recovering from faults and creating a context-dependent alternate plan. We present an architecture that serves as a basis for the central activities autonomous composition, monitoring and fault handling.
Allen, Brady; Engle, Rod O; Zendt, Joseph S; Shrier, Frank C; Wilson, Jeremy T; Connolly, Patrick J.
2016-01-01
Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and completely removed in 2012. This action opened habitat to migratory fish for the first time in 100 years. The White Salmon Working Group was formed to create plans for fish salvage in preparation for fish recolonization and to prescribe the actions necessary to restore anadromous salmonid populations in the White Salmon River after Condit Dam removal. Studies conducted by work group members and others served to inform management decisions. Management options for individual species were considered, including natural recolonization, introduction of a neighboring stock, hatchery supplementation, and monitoring natural recolonization for some time period to assess the need for hatchery supplementation. Monitoring to date indicates that multiple species and stocks of anadromous salmonids are finding and spawning in the now accessible and recovering habitat.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dotson, Patrick Wells; Little, Bonnie Colleen
Long-term controls were maintained at 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) in accordance with the requirements of the “Long-Term Monitoring and Maintenance Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit, which took effect February 26, 2015. Maintenance and controls at these SWMUs and AOCs are described and documented in this report. Conditions requiring maintenance or repair activities were not identified for any of the inspected SWMUs or AOCs. Based upon the inspections performed and site conditions observed, the administrativemore » and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment. This report does not present monitoring and maintenance activities for SWMU 76, the Mixed Waste Landfill; those activities adhere to the approved MWL LTMM Plan, Section 4.8.1 requiring a separate annual report which will be submitted to the NMED by June 30, 2017.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-05-01
This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W18-21; 299-W18-22; 299-W18-23; 299-W18-24. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.
6. Monitoring and the Northwest Forest Plan
Leslie M. Reid
1994-01-01
Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...
40 CFR 141.601 - Standard monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
Long-Term Ecological Monitoring Field Sampling Plan for 2007
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. Haney
2007-07-31
This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less
Completing a Ground Truth View of the Global Heliosphere: What Does IMAP Tell Us?
NASA Astrophysics Data System (ADS)
Matthaeus, W. H.
2014-12-01
Recent and planned advances in heliospheric research promise to provide for the first time a fairly complete picture of the processes that shape the Geospace environment and the Heliospheric envelope that defines the magnetic and plasma neighborhood of the Sun. The upcoming Solar Orbiter and Solar probe Plus missions will vastly extend our knowledge of the inner heliospheric drivers that impact the entire system. However to develop understanding of energy and particle transport that controls the Geospace plasma and radiation envirionment, it is necessary to maintain an accurate monitoring of the plasma and electromagnetic properties of the solar wind near 1 AU. To complete understanding of the Heliosphere we must also extend understanding of energy and plasma transport to regions beyond 1 AU and throughout the Heliosphere. This understanding will complete the connection between the the corona, the 1AU environment and the outer boundaries recently explored by the Voyagers and IBEX. This talk will focus on the linkages between inner heliosphere, the Geospace environment and the outer heliosphere, with an emphasis on what an L1 monitor such as IMAP can provde for the next decade of great discoveries in space physics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less
Lessons on humanitarian assistance.
Gracia Antequera, M.; Morales Suárez-Varela, M.
1999-01-01
Conflict almost completely destroyed Rwanda's infrastructure in 1994. Natural disasters, as well as disasters caused by humans, have severely challenged humanitarian aid available within the country. In this study, we have analysed the experiences of nongovernmental organizations since the summer of 1994 to evaluate how these difficulties may be overcome. One of the problems identified has been restrictions on the ability to introduce effective health planning due to the poor quality of available local information. The implementation of effective plans that show due consideration to the environment and society is clearly necessary. Effective monitoring and detailed observation are identified as being essential to the continuity of existing humanitarian assistance. PMID:10444885
MONET: a MOnitoring NEtwork of Telescopes
NASA Astrophysics Data System (ADS)
Hessman, F. V.; Beuermann, K.
2002-01-01
MONET is a planned network of two 1m-class robotic telescopes which will be used for various photometric monitoring projects -- variable stars, planet searches, AGN's, GRB's -- as well as by school children in Germany and over the world. The two host partners, the Univ. of Texas' McDonald Observatory and the South African Astronomical Observatory, will operate the telescopes in exchange for observing time on the network. MONET will be one of the first robotic telescope networks offering 1-m class telescopes, complete coverage of the sky, good longitude coverage for long observing sequences on objects near the celestial equator, and a heavy educational emphasis.
YUCSA: A CLIPS expert database system to monitor academic performance
NASA Technical Reports Server (NTRS)
Toptsis, Anestis A.; Ho, Frankie; Leindekar, Milton; Foon, Debra Low; Carbonaro, Mike
1991-01-01
The York University CLIPS Student Administrator (YUCSA), an expert database system implemented in C Language Integrated Processing System (CLIPS), for monitoring the academic performance of undergraduate students at York University, is discussed. The expert system component in the system has already been implemented for two major departments, and it is under testing and enhancement for more departments. Also, more elaborate user interfaces are under development. We describe the design and implementation of the system, problems encountered, and immediate future plans. The system has excellent maintainability and it is very efficient, taking less than one minute to complete an assessment of one student.
NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.
1991-01-01
This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration planmore » was completed. (VC)« less
Ecological effects of contaminants in McCoy Branch, 1989-1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ryon, M.G.
1992-01-01
The 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act (RCRA) required assessment of all current and former solid waste management units. Such a RCRA Facility Investigation (RFI) was required of the Y-12 Plant for their Filled Coal Ash Pond on McCoy Branch. Because the disposal of coal ash in the ash pond, McCoy Branch, and Rogers Quarry was not consistent with the Tennessee Water Quality Act, several remediation steps were implemented or planned for McCoy Branch to address disposal problems. The McCoy Branch RFI plan included provisions for biological monitoring of the McCoy Branch watershed.more » The objectives of the biological monitoring were to: (1) document changes in biological quality of McCoy Branch after completion of a pipeline and after termination of all discharges to Rogers Quarry, (2) provide guidance on the need for additional remediation, and (3) evaluate the effectiveness of implemented remedial actions. The data from the biological monitoring program will also determine if the classified uses, as identified by the State of Tennessee, of McCoy Branch are being protected and maintained. This report discusses results from toxicity monitoring of snails fish community assessment, and a Benthic macroinvertebrate community assessment.« less
Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jannik, G.T.; Mamatey, A.; Arnett, M.
1993-10-05
In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less
36 CFR 219.11 - Monitoring and evaluation for adaptive management.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sustainability in the plan area (§§ 219.19 through 219.21). The strategy must require monitoring of appropriate plan decisions and characteristics of sustainability. (1) Monitoring and evaluation of ecological sustainability. The plan monitoring strategy for the monitoring and evaluation of ecological sustainability must...
Ecological Monitoring and Compliance Program Fiscal Year 2000 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wills, C.A.
2000-12-01
The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were inmore » desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition ecoregion. Seventy bats, representing four bat species of concern, were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at selected tunnel and mine entrances verifying that some NTS mines and tunnels are used as bat roosts. Thirty-seven adult horses and 11 foals were counted this year. Four of the five foals observed last year have survived to yearlings. A monitoring plan for NTS horses was completed. Six active red-tailed hawk nests and 10 nestling red-tailed hawks were detected this year. Two spotlighting surveys for mule deer were conducted, each over three consecutive nights in October 1999 and August 2000. The mean sighting rate in October was 1.2 deer/10 kilometers (km) and 1.6 deer/10 km in August. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. Pahute Mesa Pond was confirmed to have vegetation,hydrology, and soil indicators that qualify the site as a jurisdictional wetland. The chemical spill test plan for one experiment at the HAZMAT Spill Center was reviewed for its potential to impact biota downwind of spills on Frenchman Lake playa.« less
All chain Loran-C time synchronization
NASA Technical Reports Server (NTRS)
Sherman, H. T.
1973-01-01
A program is in progress to implement coordinated universal time (UTC) synchronization on all Loran-C transmissions. The present capability is limited to five Loran-C chains in which the tolerance is twenty-five microseconds with respect to UTC. Upon completion of the program, the transmissions of all Loran-C chains will be maintained within five microseconds of UTC. The improvement plan consists of equipping selected Loran-C transmitting stations for greater precision of frequency standard adjustment and improved monitoring capability. External time monitor stations will utilize television time transfer techniques with nearby SATCOM terminals where practicable, thus providing the requisite traceability to the Naval Observatory. The monitor equipment groups and the interrelationships with the ground station equipment are discussed. After a brief review of control doctrine, forth-coming improvements to transmitting stations and how the time monitor and navigation equipments will complement each other resulting in improved service to all users of the Loran-C system are described.
Cronin, John; Storey, Adam; Zourdos, Michael C.
2016-01-01
ABSTRACT RATINGS OF PERCEIVED EXERTION ARE A VALID METHOD OF ESTIMATING THE INTENSITY OF A RESISTANCE TRAINING EXERCISE OR SESSION. SCORES ARE GIVEN AFTER COMPLETION OF AN EXERCISE OR TRAINING SESSION FOR THE PURPOSES OF ATHLETE MONITORING. HOWEVER, A NEWLY DEVELOPED SCALE BASED ON HOW MANY REPETITIONS ARE REMAINING AT THE COMPLETION OF A SET MAY BE A MORE PRECISE TOOL. THIS APPROACH ADJUSTS LOADS AUTOMATICALLY TO MATCH ATHLETE CAPABILITIES ON A SET-TO-SET BASIS AND MAY MORE ACCURATELY GAUGE INTENSITY AT NEAR-LIMIT LOADS. THIS ARTICLE OUTLINES HOW TO INCORPORATE THIS NOVEL SCALE INTO A TRAINING PLAN. PMID:27531969
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-05-01
This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix A cover the following wells: 299-E33-30; 299-E34-2; 299-E34-3; 299-E34-4; 299-E34-5; 299-E34-6. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.
Ecological Monitoring and Compliance Program Fiscal Year 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. A. Wills
The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conductedmore » for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A total of 55 juvenile owls was detected from 11 breeding pairs. Pellet analysis of burrowing owls was completed which identified key prey species. A total of 272 bats, representing 10 bat species were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at water sources and selected tunnel and mine entrances. Thirty-seven adult horses and 11 foals were counted this year. Two of the eleven foals observed last year survived to yearlings. Seven active raptor nests were found and monitored this year. These included two Great-horned Owl nests, three Barn Owl nests, and two Red-tailed Hawk nests. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical spill test plans for four experiments at the HAZMAT Spill Center were reviewed for their potential to impact biota downwind of spills on Frenchman Lake playa.« less
Craig Palmer; Barry Mulder; Barry Noon
2000-01-01
The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holland, R.C.
This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.
Albeni Falls Wildlife Mitigation : Annual Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terra-Berns, Mary
The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less
Monitoring intervention fidelity of a lifestyle behavioral intervention delivered through telehealth
Sineath, Ashley; Lambert, Lauren; Verga, Catherine; Wagstaff, Miranda
2017-01-01
Background Technology-based lifestyle behavioral interventions (i.e., telehealth, mHealth, eHealth, and/or digital health) are becoming an alternative standard of care and possess several advantages over traditional clinical settings such as convenience, cost, and the ability to tailor plans and feedback to a participant’s individual needs. These technology-based interventions also present unique challenges to intervention fidelity due to extra elements involved in executing the intervention. Intervention fidelity monitoring is essential to ensure internal and external validity, yet the development and utilization of fidelity protocols is under-reported in the literature. The purpose of this paper is to describe the intervention fidelity protocol for the 24-START study, a behavior change intervention delivered through telephone and internet. This paper also discusses the results of a pilot audit conducted to determine the feasibility of monitoring adherence to the fidelity protocol. Methods The 24-START fidelity protocol was developed in accordance with the five fidelity areas outlined by the NIH Behavior Change Consortium (NIH BCC) including: design of study, provider training, delivery of treatment, receipt of treatment, and enactment of treatment. The fidelity strategies provided by the NIH BCC in each area were tailored to fit the specific design of the 24-START study. Twenty-six total fidelity strategies were developed in accordance with the five areas and a corresponding fidelity monitoring plan was created. Because these strategies are only beneficial if implemented, the fidelity monitoring plan was developed to ensure the fidelity strategies are consistently implemented over the course of the intervention. Results A pilot audit of nine participant files was conducted to test the feasibility of the fidelity protocol developed. Out of the nine participant files reviewed, 89% of scheduled phone calls between a telehealth coach and participant were successfully completed. Of the completed calls, telehealth coaches delivered the intervention as intended 85.3% of the time, and 74% of planned secondary contacts made through the internet were delivered successfully. Additionally, between treatment group dosing was found to be equal. Several weak areas in the fidelity protocol were identified for improvement. The results were satisfactory and the audit was deemed feasible for ongoing use. Conclusions The NIH BCC provides a valuable framework for telehealth interventions to develop fidelity protocols ultimately contributing to improved internal and external validity, better translation of results, increased transparency, and increased opportunities for replication within the field. The 24-START pilot audit found the fidelity protocol efficacious and feasible while also identifying areas of weakness in need of revision. The refined protocol will continue to be utilized throughout the data collection phase. Future telehealth interventions should develop and disclose fidelity protocols to improve the overall quality and standard of telehealth interventions. PMID:28894745
Sineath, Ashley; Lambert, Lauren; Verga, Catherine; Wagstaff, Miranda; Wingo, Brooks C
2017-01-01
Technology-based lifestyle behavioral interventions (i.e., telehealth, mHealth, eHealth, and/or digital health) are becoming an alternative standard of care and possess several advantages over traditional clinical settings such as convenience, cost, and the ability to tailor plans and feedback to a participant's individual needs. These technology-based interventions also present unique challenges to intervention fidelity due to extra elements involved in executing the intervention. Intervention fidelity monitoring is essential to ensure internal and external validity, yet the development and utilization of fidelity protocols is under-reported in the literature. The purpose of this paper is to describe the intervention fidelity protocol for the 24-START study, a behavior change intervention delivered through telephone and internet. This paper also discusses the results of a pilot audit conducted to determine the feasibility of monitoring adherence to the fidelity protocol. The 24-START fidelity protocol was developed in accordance with the five fidelity areas outlined by the NIH Behavior Change Consortium (NIH BCC) including: design of study, provider training, delivery of treatment, receipt of treatment, and enactment of treatment. The fidelity strategies provided by the NIH BCC in each area were tailored to fit the specific design of the 24-START study. Twenty-six total fidelity strategies were developed in accordance with the five areas and a corresponding fidelity monitoring plan was created. Because these strategies are only beneficial if implemented, the fidelity monitoring plan was developed to ensure the fidelity strategies are consistently implemented over the course of the intervention. A pilot audit of nine participant files was conducted to test the feasibility of the fidelity protocol developed. Out of the nine participant files reviewed, 89% of scheduled phone calls between a telehealth coach and participant were successfully completed. Of the completed calls, telehealth coaches delivered the intervention as intended 85.3% of the time, and 74% of planned secondary contacts made through the internet were delivered successfully. Additionally, between treatment group dosing was found to be equal. Several weak areas in the fidelity protocol were identified for improvement. The results were satisfactory and the audit was deemed feasible for ongoing use. The NIH BCC provides a valuable framework for telehealth interventions to develop fidelity protocols ultimately contributing to improved internal and external validity, better translation of results, increased transparency, and increased opportunities for replication within the field. The 24-START pilot audit found the fidelity protocol efficacious and feasible while also identifying areas of weakness in need of revision. The refined protocol will continue to be utilized throughout the data collection phase. Future telehealth interventions should develop and disclose fidelity protocols to improve the overall quality and standard of telehealth interventions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Costa, Mafalda T., E-mail: mafaldatcosta@gmail.com; Carolino, Elisabete, E-mail: lizcarolino@gmail.com; Oliveira, Teresa A., E-mail: teresa.oliveira@uab.pt
In water supply systems with distribution networkthe most critical aspects of control and Monitoring of water quality, which generates crises system, are the effects of cross-contamination originated by the network typology. The classics of control of quality systems through the application of Shewhart charts are generally difficult to manage in real time due to the high number of charts that must be completed and evaluated. As an alternative to the traditional control systems with Shewhart charts, this study aimed to apply a simplified methodology of a monitoring plan quality parameters in a drinking water distribution, by applying Hotelling’s T{sup 2}more » charts and supplemented with Shewhart charts with Bonferroni limits system, whenever instabilities with processes were detected.« less
Ranch business planning and resource monitoring for rangeland sustainability
Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite
2012-01-01
Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Kham, E-mail: khamdiep@gmail.com; UT MD Anderson Cancer Center, School of Health Professions—Unit 2, Houston, TX; Cummings, David
The purpose of this study was to evaluate the differences between volumetric modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) in the treatment of nasal cavity carcinomas. The treatment of 10 patients, who had completed IMRT treatment for resected tumors of the nasal cavity, was replanned with the Philips Pinnacle{sup 3} Version 9 treatment-planning system. The IMRT plans used a 9-beam technique whereas the VMAT (known as SmartArc) plans used a 3-arc technique. Both types of plans were optimized using Philips Pinnacle{sup 3} Direct Machine Parameter Optimization algorithm. IMRT and VMAT plans' quality was compared by evaluating the maximum,more » minimum, and mean doses to the target volumes and organs at risk, monitor units (MUs), and the treatment delivery time. Our results indicate that VMAT is capable of greatly reducing treatment delivery time and MUs compared with IMRT. The reduction of treatment delivery time and MUs can decrease the effects of intrafractional uncertainties that can occur because of patient movement during treatment delivery. VMAT's plans further reduce doses to critical structures that are in close proximity to the target volume.« less
Epstein, Lawrence J; Valentine, Paul S
2010-05-01
The demand for sleep medicine services has grown tremendously during the last decade and will likely continue. To date, growth in demand has been met by growth in the number of new sleep centers. The need for more new centers will be dependent on market drivers that include increasing regulatory requirements, personnel shortages, integration of home sleep testing, changes in reimbursement, a shift in emphasis from diagnostics to treatment, and an increased consumer focus on sleep. The decision to open a new center should be based on understanding the market dynamics, completing a market analysis, and developing a business plan. The business plan should include an overview of the facility, a personnel and organizational structure, an evaluation of the business environment, a financial plan, a description of services provided, and a strategy for obtaining, managing, and extending a referral base. Implementation of the business plan and successful operation require ongoing planning and monitoring of operational parameters. The need for new sleep centers will likely continue, but the shifting market dynamics indicate a greater need for understanding the marketplace and careful planning.
ICU fire evacuation preparedness in London: a cross-sectional study.
Murphy, G R F; Foot, C
2011-05-01
Hospital fires present a sporadic but significant threat to patients and staff. This is especially so within an intensive care unit (ICU) setting, due to the complexity of moving acutely unwell patients reliant on invasive monitoring and organ support. Despite an average of 500 in-hospital fires reported to the UK department of health per annum, causing 65 injuries and 1-2 fatalities, the readiness of ICUs for urgent evacuation has not been assessed. A cross-sectional survey of all 50 adult and paediatric ICUs within the London Postgraduate Deanery was conducted; neonatal units were excluded. The senior nurse at each unit was asked to complete a 90-question structured questionnaire, covering unit patient characteristics, design, equipment, training, and their evacuation plan. Thirty-five of 50 (70%) responded within 2 months of the study. Significant weaknesses were reported in unit design, equipment, and planning. Unit design was compromised by inadequate fire doors (20%), ventilation cut-outs (17%), and escape routes (up to 60%). The ability to evacuate multiple patients simultaneously may be limited by a lack of portable monitoring equipment (49% of beds) and emergency drug supplies (20% of beds). Evacuation plans were often limited in their scope (96% expected to remain on their floor; 14% had plans to obtain medications after evacuation), and not rehearsed (60%). Staff training, while well provided for permanent staff, is less so for temporary staff (34%). Forward planning for an urgent evacuation can be improved.
Clinical relevance of fetal hemodynamic monitoring: Perinatal implications.
Pruetz, Jay D; Votava-Smith, Jodie; Miller, David A
2015-08-01
Comprehensive assessment of fetal wellbeing involves monitoring of fetal growth, placental function, central venous pressure, and cardiac function. Ultrasound evaluation of the fetus using 2D, color Doppler, and pulse-wave Doppler techniques form the foundation of antenatal diagnosis of structural anomalies, rhythm abnormalities and altered fetal circulation. Accurate and timely prenatal identification of the fetus at risk is critical for appropriate parental counseling, antenatal diagnostic testing, consideration for fetal intervention, perinatal planning, and coordination of postnatal care delivery. Fetal hemodynamic monitoring and serial assessment are vital to ensuring fetal wellbeing, particularly in the setting of complex congenital anomalies. A complete hemodynamic evaluation of the fetus gives important information on the likelihood of a smooth postnatal transition and contributes to ensuring the best possible outcome for the neonate. Copyright © 2015 Elsevier Ltd. All rights reserved.
An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West
Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.
2011-01-01
Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.
Social factors in space station interiors
NASA Technical Reports Server (NTRS)
Cranz, Galen; Eichold, Alice; Hottes, Klaus; Jones, Kevin; Weinstein, Linda
1987-01-01
Using the example of the chair, which is often written into space station planning but which serves no non-cultural function in zero gravity, difficulties in overcoming cultural assumptions are discussed. An experimental approach is called for which would allow designers to separate cultural assumptions from logistic, social and psychological necessities. Simulations, systematic doubt and monitored brainstorming are recommended as part of basic research so that the designer will approach the problems of space module design with a complete program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Power, G.D.
1998-04-20
This report summarizes core findings from an investigation performed by the staff of West Angeles Community Development Corporation (CDC) regarding the feasibility of marketing the Solar Medical Autoclave (``autoclave``) in South Africa. The investigation was completed during 1997, the period prescribed by the Grant Award made by the U.S. Department of Energy on January 1, 1997, and was monitored by the National Renewable Energy Laboratory.
Using artificial intelligence to automate remittance processing.
Adams, W T; Snow, G M; Helmick, P M
1998-06-01
The consolidated business office of the Allegheny Health Education Research Foundation (AHERF), a large integrated healthcare system based in Pittsburgh, Pennsylvania, sought to improve its cash-related business office activities by implementing an automated remittance processing system that uses artificial intelligence. The goal was to create a completely automated system whereby all monies it processed would be tracked, automatically posted, analyzed, monitored, controlled, and reconciled through a central database. Using a phased approach, the automated payment system has become the central repository for all of the remittances for seven of the hospitals in the AHERF system and has allowed for the complete integration of these hospitals' existing billing systems, document imaging system, and intranet, as well as the new automated payment posting, and electronic cash tracking and reconciling systems. For such new technology, which is designed to bring about major change, factors contributing to the project's success were adequate planning, clearly articulated objectives, marketing, end-user acceptance, and post-implementation plan revision.
NASA Technical Reports Server (NTRS)
Barnum, P. W.; Renzetti, N. A.; Textor, G. P.; Kelly, L. B.
1973-01-01
The Tracking and Data System (TDS) Support for the Mariner Mars 1971 Mission final report contains the deep space tracking and data acquisition activities in support of orbital operations. During this period a major NASA objective was accomplished: completion of the 180th revolution and 90th day of data gathering with the spacecraft about the planet Mars. Included are presentations of the TDS flight support pass chronology data for each of the Deep Space Stations used, and performance evaluation for the Deep Space Network Telemetry, Tracking, Command, and Monitor Systems. With the loss of Mariner 8 at launch, Mariner 9 assumed the mission plan of Mariner 8, which included the TV mapping cycles and a 12-hr orbital period. The mission plan was modified as a result of a severe dust storm on the surface of Mars, which delayed the start of the TV mapping cycles. Thus, the end of primary mission date was extended to complete the TV mapping cycles.
Monitoring in the nearshore: A process for making reasoned decisions
Bodkin, James L.; Dean, T.A.
2003-01-01
Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.
NASA Ames Research Center 60 MW Power Supply Modernization
NASA Technical Reports Server (NTRS)
Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)
2001-01-01
The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2014 CFR
2014-07-01
... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...
NASA Astrophysics Data System (ADS)
Bozzo, E.; Antonelli, A.; Argan, A.; Barret, D.; Binko, Pavel; Brandt, S.; Cavazzuti, E.; Courvoisier, T.; den Herder, J. W.; Feroci, M.; Ferrigno, C.; Giommi, P.; Götz, D.; Guy, L.; Hernanz, M.; in't Zand, J. J. M.; Klochkov, D.; Kuulkers, Erik; Motch, C.; Lumb, D.; Papitto, A.; Pittori, Carlotta; Rohlfs, R.; Santangelo, A.; Schmid, C.; Schwope, A. D.; Smith, P. J.; Webb, N. A.; Wilms, J.; Zane, S.
2014-07-01
LOFT, the Large Observatory For X-ray Timing, was one of the ESA M3 mission candidates that completed their assessment phase at the end of 2013. LOFT is equipped with two instruments, the Large Area Detector (LAD) and the Wide Field Monitor (WFM). The LAD performs pointed observations of several targets per orbit (~90 minutes), providing roughly ~80 GB of proprietary data per day (the proprietary period will be 12 months). The WFM continuously monitors about 1/3 of the sky at a time and provides data for about ~100 sources a day, resulting in a total of ~20 GB of additional telemetry. The LOFT Burst alert System additionally identifies on-board bright impulsive events (e.g., Gamma-ray Bursts, GRBs) and broadcasts the corresponding position and trigger time to the ground using a dedicated system of ~15 VHF receivers. All WFM data are planned to be made public immediately. In this contribution we summarize the planned organization of the LOFT ground segment (GS), as established in the mission Yellow Book1. We describe the expected GS contributions from ESA and the LOFT consortium. A review is provided of the planned LOFT data products and the details of the data flow, archiving and distribution. Despite LOFT was not selected for launch within the M3 call, its long assessment phase ( >2 years) led to a very solid mission design and an efficient planning of its ground operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Johnson, Christian D.
Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal.) of liquid into the vadose zone at the Hanford Site. Much of this discharge of liquid waste into the vadose zone occurred in the Central Plateau, a 200 km 2 (75 mi 2) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater. The Tri-Party Agenciesmore » (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M 015 50, which directed DOE to submit a treatability test plan for remediation of technetium-99 (Tc-99) and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. A field test of desiccation is being conducted as an element of the DOE test plan published in March 2008 to meet Milestone M 015 50. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 3 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.« less
Eikelenboom, Nathalie; van Lieshout, Jan; Jacobs, Annelies; Verhulst, Frank; Lacroix, Joyca; van Halteren, Aart; Klomp, Maarten; Smeele, Ivo; Wensing, Michel
2016-01-01
Background Self-management support is an important component of the clinical management of many chronic conditions. The validated Self-Management Screening questionnaire (SeMaS) assesses individual characteristics that influence a patient’s ability to self-manage. Aim To assess the effect of providing personalised self-management support in clinical practice on patients’ activation and health-related behaviours. Design and setting A cluster randomised controlled trial was conducted in 15 primary care group practices in the south of the Netherlands. Method After attending a dedicated self-management support training session, practice nurses in the intervention arm discussed the results of SeMaS with the patient at baseline, and tailored the self-management support. Participants completed a 13-item Patient Activation Measure (PAM-13) and validated lifestyle questionnaires at baseline and after 6 months. Data, including individual care plans, referrals to self-management interventions, self-monitoring, and healthcare use, were extracted from patients’ medical records. Multilevel multiple regression was used to assess the effect on outcomes. Results The PAM-13 score did not differ significantly between the control (n = 348) and intervention (n = 296) arms at 6 months. In the intervention arm, 29.4% of the patients performed self-monitoring, versus 15.2% in the control arm (effect size r = 0.9, P = 0.01). In the per protocol analysis (control n = 348; intervention n = 136), the effect of the intervention was significant on the number of individual care plans (effect size r = 1.3, P = 0.04) and on self-monitoring (effect size r = 1.0, P = 0.01). Conclusion This study showed that discussing SeMaS and offering tailored support did not affect patient activation or lifestyle, but did stimulate patients to self-monitor and use individual care plans. PMID:27080318
13. Operational planning for a specific intervention.
2014-05-01
Every intervention must follow an operational plan. Operational plans delineate actions required to meet an objective that is part of the strategic plan (overarching goal). Operational plans dictate the critical pathways for the interventions that will be followed during and following the implementation of the intervention. Operational plans include: (1) an introduction and brief situation report; (2) an overview of the task(s), objectives, and the overarching goal to be addressed; (3) the methods that will be employed; (4) planning factors; (5) the resources that will be required including personnel, equipment, and supplies; (6) timelines, benchmarks, and milestones including their respective indicators, startup time, end point, and estimates of the time required for completion; (7) the administrative structure to be employed; (8) an operating budget; (9) the strategy for acquiring the funding required; (10) roles and responsibilities of the personnel including position descriptions and the competencies required of the personnel (skill sets); (11) mechanisms for monitoring the progress including the indicators that will be employed, (12) safety, including health of the personnel, required immunisations, accommodations, and reporting structure; (13) self-sufficiency; and (14) reporting and accounting. There are many generic items in an operational plan that can be used in successive plans. Without a detailed operational plan, interventions are doomed to probable failure and can profoundly negatively impact other projects operational in the area.
Neaton, James D; Grund, Birgit; Wentworth, Deborah
2018-03-01
Data monitoring committees for randomized clinical trials have the responsibility of safeguarding interests of trial participants. To do so, the data monitoring committee must receive reports on safety and efficacy to assess risk/benefit and on trial conduct to ensure that the study can achieve its goals. This article outlines the key components of reports to the data monitoring committee and the important role of the unblinded statistician in preparing those reports. Most data monitoring committee meetings include open and closed sessions. For each session, there is a report of interim results. The open session is attended by the sponsor and lead investigators, including the statistician(s) responsible for the trial design. These investigators are blinded to the interim treatment comparisons. The closed session is attended by the data monitoring committee members and by the statistician(s) who prepared the closed report. These individuals are unblinded to interim treatment comparisons and therefore are not involved in study design changes. The optimal content of data monitoring committee reports and qualifications of the unblinded statistician(s) are discussed. Open reports should include responses to data monitoring committee recommendations, a synopsis of the protocol, a review of the protocol history and amendments, and information on enrollment, baseline characteristics, completeness of follow-up, and data quality. The open report is also a vehicle through which the sponsor and investigators should inform the data monitoring committee of relevant external information. Data in the open report are pooled over the treatment groups. The open report should not include data summaries by treatment group. The closed report should include a written summary with references to key tables and figures and methods used to prepare them. Tables and figures should summarize baseline characteristics, follow-up completeness, treatment adherence, and major safety and efficacy outcomes by treatment group. Text summaries should accompany the tables and figures. The data monitoring committee monitoring history (e.g. treatment differences at previous meetings) should be summarized. The unblinded statistician preparing the closed report should be familiar with the protocol and data collection plan and be capable of customizing the report to the current stage of the trial. This includes anticipating questions that may arise during the data monitoring committee review and pro-actively including data summaries to address these questions. There is considerable variation in the quality of open and closed data monitoring committee reports. Open and closed data monitoring committee reports should be concise, up to date, and informative. To achieve this, unblinded statisticians responsible for preparing closed data monitoring committee reports should be familiar with the statistical methods, the trial protocol, and the data collection plan. They should be capable of anticipating questions from the data monitoring committee and responding to requests for additional analyses.
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
Australasian Resuscitation In Sepsis Evaluation trial statistical analysis plan.
Delaney, Anthony; Peake, Sandra L; Bellomo, Rinaldo; Cameron, Peter; Holdgate, Anna; Howe, Belinda; Higgins, Alisa; Presneill, Jeffrey; Webb, Steve
2013-10-01
The Australasian Resuscitation In Sepsis Evaluation (ARISE) study is an international, multicentre, randomised, controlled trial designed to evaluate the effectiveness of early goal-directed therapy compared with standard care for patients presenting to the ED with severe sepsis. In keeping with current practice, and taking into considerations aspects of trial design and reporting specific to non-pharmacologic interventions, this document outlines the principles and methods for analysing and reporting the trial results. The document is prepared prior to completion of recruitment into the ARISE study, without knowledge of the results of the interim analysis conducted by the data safety and monitoring committee and prior to completion of the two related international studies. The statistical analysis plan was designed by the ARISE chief investigators, and reviewed and approved by the ARISE steering committee. The data collected by the research team as specified in the study protocol, and detailed in the study case report form were reviewed. Information related to baseline characteristics, characteristics of delivery of the trial interventions, details of resuscitation and other related therapies, and other relevant data are described with appropriate comparisons between groups. The primary, secondary and tertiary outcomes for the study are defined, with description of the planned statistical analyses. A statistical analysis plan was developed, along with a trial profile, mock-up tables and figures. A plan for presenting baseline characteristics, microbiological and antibiotic therapy, details of the interventions, processes of care and concomitant therapies, along with adverse events are described. The primary, secondary and tertiary outcomes are described along with identification of subgroups to be analysed. A statistical analysis plan for the ARISE study has been developed, and is available in the public domain, prior to the completion of recruitment into the study. This will minimise analytic bias and conforms to current best practice in conducting clinical trials. © 2013 Australasian College for Emergency Medicine and Australasian Society for Emergency Medicine.
Nelson, Joan M; Cook, Paul F; Ingram, Jennifer C
2014-02-01
To evaluate constructs from the theory of planned behavior (TPB, Ajzen 2002) - attitudes, sense of control, subjective norms and intentions - as predictors of accuracy in blood pressure monitoring. Despite numerous initiatives aimed at teaching blood pressure measurement techniques, many healthcare providers measure blood pressures incorrectly. Descriptive, cohort design. Medical assistants and licensed practical nurses were asked to complete a questionnaire on TPB variables. These nursing staff's patients had their blood pressures measured and completed a survey about techniques used to measure their blood pressure. We correlated nursing staff's responses on the TBP questionnaire with their intention to measure an accurate blood pressure and with the difference between their actual blood pressure measurement and a second measurement taken by a researcher immediately after the clinic visit. Patients' perceptions of MAs' and LPNs' blood pressure measurement techniques were examined descriptively. Perceived control and social norm predicted intention to measure an accurate blood pressure, with a negative relationship between knowledge and intention. Consistent with the TPB, intention was the only significant predictor of blood pressure measurement accuracy. Theory of planned behavior constructs predicted the healthcare providers' intention to measure blood pressure accurately and intention predicted the actual accuracy of systolic blood pressure measurement. However, participants' knowledge about blood pressure measurement had an unexpected negative relationship with their intentions. These findings have important implications for nursing education departments and organisations which traditionally invest significant time and effort in annual competency training focused on knowledge enhancement by staff. This study suggests that a better strategy might involve efforts to enhance providers' intention to change, particularly by changing social norms or increasing perceived control of the behaviour by nursing staff. © 2013 Blackwell Publishing Ltd.
Vandergast, Amy G.
2017-06-02
Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.
David E. Busch; Jon R. Martin
2006-01-01
Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
2016-12-01
This report presents the analytical data for the 2014 fiscal year (FY) and calendar year (CY) (October 1, 2013, through December 31, 2014), and an evaluation of the data to ensure that the Sampling Plan’s objectives are met. In addition to samples collected and analyzed for the Sampling Plan, some NNSS wells are monitored by NNSA/NFO to demonstrate compliance with State-issued water discharge permits; with protection of groundwater from ongoing radiological waste disposal activities (compliance wells); and to demonstrate that the onsite drinking water supply is below SDWA maximum contaminant levels (MCLs) (public water system [PWS] wells). While not allmore » sampled locations are required by the Sampling Plan, these samples are relevant to its objectives and are therefore presented herein for completeness purposes. Special investigations that took place in 2014 that are relevant to the Sampling Plan are also presented. This is the first annual report released to support Sampling Plan implementation.« less
What Climate Information Do Water Managers Need to Make Robust, Long-Term Plans?
NASA Astrophysics Data System (ADS)
Duran, R.; Lempert, R.; Groves, D.
2008-12-01
What climate information do water managers need to respond to threat of climate change? Southern California's Inland Empire Utilities Agency (IEUA) completed a long-range water resource management plan in 2005 that addressed expected economic and population growth in their service region, but did not consider the potential impacts of climate change. Using a robust decision making (RDM) approach for policy under deep uncertainty, we recently worked with IEUA to conduct a climate-change vulnerability and response options analysis of the agency's long-range plans. This analysis suggests that IEUA is vulnerable to future climate change, but can significantly reduce this vulnerability by increasing their near-term conservation programs and careful monitoring and updating to adjust their plan in the years ahead. In addition to helping IEUA, this analysis provides important guidance on the types of climate and other information that can be most useful for water managers as they attempt to take robust, near-term actions to increaase their resilience to climate change.
Transfusion monitoring: care practice analysis in a public teaching hospital
dos Reis, Valesca Nunes; Paixão, Isabella Bertolin; Perrone, Ana Carolina Amaral de São José; Monteiro, Maria Inês; dos Santos, Kelli Borges
2016-01-01
ABSTRACT Objective To analyze the process of recording transfusion monitoring at a public teaching hospital. Methods A descriptive and retrospective study with a quantitative approach, analyzing the instruments to record transfusion monitoring at a public hospital in a city in the State of Minas Gerais (MG). Data were collected on the correct completion of the instrument, time elapsed from transfusions, records of vital signs, type of blood component more frequently transfused, and hospital unit where transfusion was performed. Results A total of 1,012 records were analyzed, and 53.4% of them had errors in filling in the instruments, 6% of transfusions started after the recommended time, and 9.3% of patients had no vital signs registered. Conclusion Failures were identified in the process of recording transfusion monitoring, and they could result in more adverse events related to the administration of blood components. Planning and implementing strategies to enhance recording and to improve care delivered are challenging. PMID:27074233
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.
2001-03-01
The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly amore » basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robertson, Shawn W.
2001-03-01
The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band,more » westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.
The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband andmore » bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.
The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less
The prioritisation of paediatrics and palliative care in cancer control plans in Africa.
Weaver, M S; Yao, A J J; Renner, L A; Harif, M; Lam, C G
2015-06-09
Given the burden of childhood cancer and palliative care need in Africa, this paper investigated the paediatric and palliative care elements in cancer control plans. We conducted a comparative content analysis of accessible national cancer control plans in Africa, using a health systems perspective attentive to context, development, scope, and monitoring/evaluation. Burden estimates were derived from World Bank, World Health Organisation, and Worldwide Palliative Care Alliance. Eighteen national plans and one Africa-wide plan (10 English, 9 French) were accessible, representing 9 low-, 4 lower-middle-, and 5 upper-middle-income settings. Ten plans discussed cancer control in the context of noncommunicable diseases. Paediatric cancer was mentioned in 7 national plans, representing 5127 children, or 13% of the estimated continental burden for children aged 0-14 years. Palliative care needs were recognised in 11 national plans, representing 157 490 children, or 24% of the estimated Africa-wide burden for children aged 0-14 years; four plans specified paediatric palliative needs. Palliative care was itemised in four budgets. Sample indicators and equity measures were identified, including those highlighting contextual needs for treatment access and completion. Recognising explicit strategies and funding for paediatric and palliative services may guide prioritised cancer control efforts in resource-limited settings.
1992-09-24
for the fifteen remaining study sites. The total number of structures to be surveyed was estimated at 800 to 1,000. When the contract was complete...Corps of Engineers real estate appraisers or contract appraisers, should be listed as a separate task. The approximate number of structures to be...DOWNGRADING SCHEDULE Distribution of this document is unlimited. 4. PERFORMING ORGANIZATION REPORT NUMBER (S) S. MONITORING ORGANIZATION REPORT NUMBER (S
Brassboard Astrometric Beam Combiner (ABC) Development for the Space Interferometry Mission (SIM)
NASA Technical Reports Server (NTRS)
Jeganathan, Muthu; Kuan, Gary; Rud, Mike; Lin, Sean; Sutherland, Kristen; Moore, James; An, Xin
2008-01-01
The Astrometric Beam Combiner (ABC) is a critical element of the Space Interferometry Mission (SIM) that performs three key functions: coherently combine starlight from two siderostats; individually detect starlight for angle tracking; and disperse and detect the interferometric fringes. In addition, the ABC contains: a stimulus, cornercubes and shutters for in-orbit calibration; several tip/tilt mirror mechanisms for in-orbit alignment; and internal metrology beam launcher for pathlength monitoring. The detailed design of the brassboard ABC (which has the form, fit and function of the flight unit) is complete, procurement of long-lead items is underway, and assembly and testing is expected to be completed in Spring 2009. In this paper, we present the key requirements for the ABC, details of the completed optical and mechanical design as well as plans for assembly and alignment.
Core components of a comprehensive quality assurance program in anatomic pathology.
Nakhleh, Raouf E
2009-11-01
In this article the core components of a comprehensive quality assurance and improvement plan are outlined. Quality anatomic pathology work comes with focus on accurate, timely, and complete reports. A commitment to continuous quality improvement and a systems approach with a persistent effort helps to achieve this end. Departments should have a quality assurance and improvement plan that includes a risk assessment of real and potential problems facing the laboratory. The plan should also list the individuals responsible for carrying out the program with adequate resources, a defined timetable, and annual assessment for progress and future directions. Quality assurance monitors should address regulatory requirements and be organized by laboratory division (surgical pathology, cytology, etc) as well as 5 segments (preanalytic, analytic, postanalytic phases of the test cycle, turn-around-time, and customer satisfaction). Quality assurance data can also be used to evaluate individual pathologists using multiple parameters with peer group comparison.
Biowaste monitoring system for shuttle
NASA Technical Reports Server (NTRS)
Fogal, G. L.; Sauer, R. L.
1975-01-01
The acquisition of crew biomedical data has been an important task on all manned space missions from Project Mercury through the recently completed Skylab Missions. The monitoring of metabolic wastes from the crew is an important aspect of this activity. On early missions emphasis was placed on the collection and return of biowaste samples for post-mission analysis. On later missions such as Skylab, equipment for inflight measurement was also added. Life Science experiments are being proposed for Shuttle missions which will require the inflight measurement and sampling of metabolic wastes. In order to minimize the crew impact associated with these requirements, a high degree of automation of these processes will be required. This paper reviews the design and capabilities of urine biowaste monitoring equipment provided on past-manned space programs and defines and describes the urine volume measurement and sampling equipment planned for the Shuttle Orbiter program.
NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolich, George; Mizell, Steve; McCurdy, Greg
2017-10-01
Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less
The Program for Regional and International Shorebird Monitoring (PRISM)
Bart, J.; Andres, B.; Brown, S.; Donaldson, G.; Harrington, B.; Johnston, V.; Jones, S.; Morrison, R.I.G.; Skagen, S.K.
2005-01-01
This report describes the "Program for Regional and International Shorebird Monitoring" (PRISM). PRISM is being implemented by a Canada-United States Shorebird Monitoring and Assessment Committee formed in 2001 by the Canadian Shorebird Working Group and the U.S. Shorebird Council. PRISM provides a single blueprint for implementing the shorebird conservation plans recently completed in Canada and the United States. The goals of PRISM are to (1) estimate the size of breeding population of 74 shorebird taxa in North America; (2) describe the distribution, abundance, and habitat relationships for each of these taxa; (3) monitor trends in shorebird population size; (4) monitor shorebird numbers at stopover locations, and; (5) assist local managers in meeting their shorebird conservation goals. PRISM has four main components: arctic and boreal breeding surveys, temperate breeding surveys, temperate non-breeding surveys, and neotropical surveys. Progress on, and action items for, each major component are described. The more important major tasks for immediate action are carrying out the northern surveys, conducting regional analyses to design the program of migration counts, and evaluating aerial photographic surveys for migration and winter counts.
Region 7 States Air Quality Monitoring Plans - Iowa
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Missouri
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Nebraska
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Kansas
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Data Validation Package: April 2016 Groundwater Sampling at the Falls City, Texas, Disposal Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jasso, Tashina; Widdop, Michael
Nine groundwater samples were collected at the Falls City, Texas, Disposal Site as specified in the March 2008 Long-Term Surveillance Plan for the US Department of Energy Falls City Uranium Mill Tailings Disposal Site, Falls City, Texas (DOE-LM/1602-2008). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). The wells sampled included the cell performance monitoring wells (0709, 0858, 0880, 0906, and 0921) and the groundwater monitoring wells (0862, 0886, 0891, 0924, and 0963). A duplicate sample was collected from location 0891. Water levelsmore » were measured at each sampled well. Historically, cell performance monitoring wells 0908 and 0916 have not produced water and were confirmed as dry during this sampling event. These wells are completed above the saturated interval in the formation. Notable observations for time-concentration graphs in this report include: (1) uranium concentrations in well 0891 continue to increase; (2) the uranium concentration in well 0880 is higher than the 2015 value and lower than the 2014 value, and it remains within the range of historical values; and (3) uranium concentrations in the other sampled wells are below 2 mg/L and consistent with previous results.« less
Yilmaz, Ozge; Can, Zehra S; Toroz, Ismail; Dogan, Ozgur; Oncel, Salim; Alp, Emre; Dilek, Filiz B; Karanfil, Tanju; Yetis, Ulku
2014-08-01
Hazardous waste (HW) generation information is an absolute necessity for ensuring the proper planning, implementation, and monitoring of any waste management system. Unfortunately, environmental agencies in developing countries face difficulties in gathering data directly from the creators of such wastes. It is possible, however, to construct theoretical HW inventories using the waste generation factors (WGFs). The objective of this study was to develop a complete nationwide HW inventory of Turkey that relies on nation-specific WGFs to support management activities of the Turkish Ministry of Environment and Urbanization (MoEU). Inventory studies relied on WGFs from: (a) the literature and (b) field studies and analysis of waste declarations reflecting country-specific industrial practices. Moreover, new tools were introduced to the monitoring infrastructure of MoEU to obtain a comprehensive waste generation data set. Through field studies and a consideration of country specific conditions, it was possible to more thoroughly elucidate HW generation trends in Turkey, a method that was deemed superior to other alternatives. Declaration and literature based WGFs also proved most helpful in supplementing field observations that could not always be conducted. It was determined that these theoretical inventories could become valuable assets in supporting regulating agencies in developing countries for a more thorough implementation of HW management systems. © The Author(s) 2014.
Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.
2014-01-01
A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This document is a compendium of water quality and hydrologic characterization data obtained through December 2005 from the network of groundwater monitoring wells and surface water sampling stations (including springs and building sumps) at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee that have been sampled since January 2003. The primary objectives of this document, hereafter referenced as the Y-12 Groundwater Protection Program (GWPP) Compendium, are to: (1) Serve as a single-source reference for monitoring data that meet the requirements of the Y-12 GWPP, as defined in the Y-12 GWPP Management Plan (BWXTmore » Y-12 L.L.C. [BWXT] 2004); (2) Maintain a detailed analysis and evaluation of the monitoring data for each applicable well, spring, and surface water sampling station, with a focus on results for the primary inorganic, organic, and radiological contaminants in groundwater and surface water at Y-12; and (3) Ensure retention of ''institutional knowledge'' obtained over the long-term (>20-year) history of groundwater and surface water monitoring at Y-12 and the related sources of groundwater and surface water contamination. To achieve these goals, the Y-12 GWPP Compendium brings together salient hydrologic, geologic, geochemical, water-quality, and environmental compliance information that is otherwise disseminated throughout numerous technical documents and reports prepared in support of completed and ongoing environmental contamination assessment, remediation, and monitoring activities performed at Y-12. The following subsections provide background information regarding the overall scope and format of the Y-12 GWPP Compendium and the planned approach for distribution and revision (i.e., administration) of this ''living'' document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Price, Jeffrey
2015-08-01
Groundwater samples were collected during the 2015 sampling event from point-of-compliance (POC) wells 0171, 0173, 0176, 0179, 0181, and 0813 to monitor the disposition of contaminants in the middle sandstone unit of the Cedar Mountain Formation. Groundwater samples also were collected from alluvium monitoring wells 0188, 0189, 0192, 0194, and 0707, and basal sandstone monitoring wells 0182, 0184, 0185, and 0588 as a best management practice. Surface locations 0846 and 0847 were sampled to monitor for degradation of water quality in the backwater area of Brown’s Wash and in the Green River immediately downstream of Brown’s Wash. The Green Rivermore » location 0801 is upstream from the site and is sampled to determine background-threshold values (BTVs). Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Water levels were measured at each sampled well. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. All six POC wells are completed in the middle sandstone unit of the Cedar Mountain Formation and are monitored to measure contaminant concentrations for comparison to proposed alternate concentration limits (ACLs), as provided in Table 1. Contaminant concentrations in the POC wells remain below their respective ACLs.« less
Weiner, Scott G; Griggs, Christopher A; Mitchell, Patricia M; Langlois, Breanne K; Friedman, Franklin D; Moore, Rebecca L; Lin, Shuo Cheng; Nelson, Kerrie P; Feldman, James A
2013-10-01
We compare emergency provider impression of drug-seeking behavior with objective criteria from a state prescription drug monitoring program, assess change in opioid pain reliever prescribing after prescription drug monitoring program review, and examine clinical factors associated with suspected drug-seeking behavior. This was a prospective observational study of emergency providers assessing a convenience sample of patients aged 18 to 64 years who presented to either of 2 academic medical centers with chief complaint of back pain, dental pain, or headache. Drug-seeking behavior was objectively defined as present when a patient had greater than or equal to 4 opioid prescriptions by greater than or equal to 4 providers in the 12 months before emergency department evaluation. Emergency providers completed data forms recording their impression of the likelihood of drug-seeking behavior, patient characteristics, and plan for prescribing pre- and post-prescription drug monitoring program review. Descriptive statistics were generated. We calculated agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program definition, and sensitivity, specificity, and positive predictive value of emergency provider impression, using prescription drug monitoring program criteria as the criterion standard. A multivariate logistic regression analysis was conducted to determine clinical factors associated with drug-seeking behavior. Thirty-eight emergency providers with prescription drug monitoring program access participated. There were 544 patient visits entered into the study from June 2011 to January 2013. There was fair agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program (κ=0.30). Emergency providers had sensitivity 63.2% (95% confidence interval [CI] 54.8% to 71.7%), specificity 72.7% (95% CI 68.4% to 77.0%), and positive predictive value 41.2% (95% CI 34.4% to 48.2%) for identifying drug-seeking behavior. After exposure to prescription drug monitoring program data, emergency providers changed plans to prescribe opioids at discharge in 9.5% of cases (95% CI 7.3% to 12.2%), with 6.5% of patients (n=35) receiving opioids not previously planned and 3.0% (n=16) no longer receiving opioids. Predictors for drug-seeking behavior by prescription drug monitoring program criteria were patient requests opioid medications by name (odds ratio [OR] 1.91; 95% CI 1.13 to 3.23), multiple visits for same complaint (OR 2.5; 95% CI 1.49 to 4.18), suspicious history (OR 1.88; 95% CI 1.1 to 3.19), symptoms out of proportion to examination (OR 1.83; 95% CI 1.1 to 3.03), and hospital site (OR 3.1; 95% CI 1.76 to 5.44). Emergency providers had fair agreement with objective criteria from the prescription drug monitoring program in suspecting drug-seeking behavior. Program review changed management plans in a small number of cases. Multiple clinical factors were predictive of drug-seeking behavior. Copyright © 2013 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.
40 CFR 75.53 - Monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...
40 CFR 75.53 - Monitoring plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
Roberts, J; Waddy, S; Kaufmann, P
2012-01-01
It is commonly accepted that inefficient recruitment and inadequate retention continue to threaten the completion of clinical trials intended to reduce the public health burden of neurological disease. This article will discuss the scientific, economic, and ethical implications of failure to recruit and retain adequate samples in clinical trials, including the consequences of failing to recruit adequately diverse samples. We will also discuss the more common challenges and barriers to efficient and effective recruitment and retention, and the impact these have on successful clinical trial planning. We will explain the newly established efforts within National Institute of Neurological Disorders and Stroke (NINDS) to monitor recruitment and retention with well-defined metrics and implementation of grant awards that include feasibility milestones for continued funding. Finally, we will describe our efforts to address some of the common challenges to recruitment and retention through assistance to investigators and coordinators with evidence-based support, tools, and resources for planning and strategizing recruitment and retention as well as a trans-NIH effort to improve awareness of clinical research in the general public. PMID:23230460
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreie, Ken; Traub, David
The 2001 Long-Term Surveillance Plan (LTSP) for the US. Department of Energy Sherwood Project (UMI'RCA Title II) Reclamation Cell, Wellpinit, Washington, does not require groundwater compliance monitoring at the Sherwood site. However, the LTSP stipulates limited groundwater monitoring for chloride and sulfate (designated indicator parameters) and total dissolved solids (TDS) as a best management practice. Samples were collected from the background well, MW-2B, and the two downgradient wells, MW-4 and MW-10, in accordance with the LTSP. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351,more » continually updated). Water levels were measured in all wells prior to sampling and in four piezometers completed in the tailings dam. Time-concentration graphs included in this report indicate that the chloride, sulfate, and TDS concentrations are consistent with historical measurements. The concentrations of chloride and sulfate are well below the State of Washington water quality criteria value of 250 milligrams per liter (mg/L) for both parameters.« less
Developing A National Groundwater-Monitoring Network In Korea
NASA Astrophysics Data System (ADS)
Kim, N. J.; Cho, M. J.; Woo, N. C.
1995-04-01
Since the 1960's, the groundwater resources of Korea have been developed without a proper regulatory system for monitoring and preservation, resulting in significant source depletion, land subsidence, water contamination, and sea-water intrusion. With the activation of the "Groundwater Law" in June 1994, the government initiated a project to develop a groundwater-monitoring network to describe general groundwater quality, to define its long-term changes, and to identify major factors affecting changes in groundwater quality and yield. In selecting monitoring locations nationwide, criteria considered are 1) spatial distribution, 2) aquifer characteristics of hydrogeologic units, 3) local groundwater flow regime, 4) linkage with surface hydrology observations, 5) site accessibility, and 6) financial situations. A total of 310 sites in 78 small hydrologic basins were selected to compose the monitoring network. Installation of monitoring wells is scheduled to start in 1995 for 15 sites; the remainder are scheduled to be completed by 2001. At each site, a nest of monitoring wells was designed; shallow and deep groundwater will be monitored for water temperature, pH, EC, DO and TDS every month. Water-level fluctuations will also be measured by automatic recorders equipped with pressure transducers. As a next step, the government plans to develop a groundwater-database management system, which could be linked with surface hydrologic data.
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
Wierl, J.A.; Rappold, K.F.; Amerson, F.U.
1996-01-01
In 1992, the Wisconsin Department of Natural Resources (WDNR) in cooperation with the U.S. Geological Survey initiated a land-use inventory to identify sources of pollutants and track the land-management changes for eight evaluation monitoring watersheds established as part of the WDNR's Nonpoint Source Program. Each evaluation monitoring watershed is within a WDNR priority watershed. The U.S. Geological Survey is responsible for collection of water-quality data in the evaluation monitoring watersheds. An initial inventory was completed for each of the WDNR priority watersheds before nonpoint-source plans were developed for the control of nonpoint pollution. The land-use inventory described in this report expands upon the initial inventory by including nonpoint pollution sources that were not identified and also by updating changes in landuse and land-management practices. New sources of nonpoint pollution, not identified in the initial inventory, could prove to be important when monitored and modeled data are analyzed. This effort to inventory the evaluation monitoring watersheds will help with the interpretation of future land-use and water-quality data. This report describes landuse inventory methods, presents results of the inventory, and lists proposed future activities.
Anticipating market demand: tracking enrollee satisfaction and health over time.
Allen, H
1998-12-01
To assess guidelines, set by the National Committee for Quality Assurance, for the Health Plan Employer Data and Information Set (HEDIS) 1999 CAHPS 2.0H Survey (formerly the HEDIS 1999 Consumer Survey) in the light of user's needs to monitor health plan performance over time, monitor sick enrollees, and prioritize determinants (drivers) of enrollee experience. A two-wave, cross-sectional/longitudinal panel design, consisting of national surveys mailed to employees of three major USA corporations in 1993 and 1995. Samples included employees selected to represent 23 major managed care and indemnity plans in five regions of the USA. In 1993, 14 587 employees responded and in 1995 9018 employees responded (response rates: 51 and 52%). The longitudinal panel sample included 5729 employees who completed both surveys and stayed in the same plan for both years. STUDY MEASURES: The main 1993 and 1995 surveys consisted of 154 and 116 items, respectively. Panel survey content assessed care delivery, plan administration, functional status, well being, and chronic disease. CAHPS 2.0H's point-in-time, cross-sectional design was unable to detect selection bias and led to an inaccurate view of change in performance. CAHPS 2.0H's use of aggregate samples masked key differences between healthy and sick enrollees; e.g. the sick became less satisfied over time. The association-based, statistical techniques that many survey users will employ to prioritize the 'drivers' of enrollee experience in the absence of CAHPS 2.0H guidelines yielded a less efficient account of change than the multi-method/multi-trait approach developed for this project. Consumer experience of plan performance is best understood when the separate contributions of longitudinal membership and movement in and out of plans are clarified, changes in health are identified, changes for sick and healthy enrollees are compared, and plan performance on satisfaction criteria is probed to give confirmation and detail. Changes to the CAHPS 2.0H approach in HEDIS 1999 will facilitate user application of these principles.
2016 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site January 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreie, Ken; Findlay, Rick
The Gnome-Coach, New Mexico, Site was the location of an underground nuclear test in 1961 and a groundwater tracer test in 1963. Residual contamination remaining in the subsurface from these events requires long-term oversight. The Long-Term Surveillance and Maintenance Plan for the site describes the U.S. Department of Energy Office of Legacy Management’s (LM’s) plan for monitoring groundwater (radiochemical sampling and hydraulic head measurements), inspecting the site, maintaining the site’s institutional controls, evaluating and reporting data, and documenting the site’s records and data management processes. Groundwater monitoring and site inspection activities are conducted annually. This report summarizes the results ofmore » these activities conducted during the October 2015 through September 2016 reporting period. The site inspection and annual sampling were conducted on January 27, 2016. At the time of the site inspection, the signs installed near the emplacement shaft, near well USGS-1, and around the perimeter of the site were observed as being in good condition, as were the roads, wellheads, and Project Gnome monument. No new groundwater extraction wells or oil and gas wells were installed during this reporting period on the site or in the sections that surround the site. One new application was received by the New Mexico Oil Conservation Division to install a salt water disposal well approximately 0.8 miles northeast of the Project Gnome monument. The proposed well has a planned completion depth of 15,500 feet below ground surface, but as of November 2016 a drill date has not been established.« less
Wang, Jia; Liu, Ru-De; Ding, Yi; Liu, Ying; Xu, Le; Zhen, Rui
2017-01-01
This study investigated how and why Chinese adolescents choose between playing online games and doing homework, using the model of the theory of planned behavior (TPB) in which the subjective norm was manipulated as two sub-elements (peer support and parental monitoring). A total of 530 students from an elementary school and a middle school in China were asked to complete the measures assessing two predictors of TPB: attitude and perceived behavioral control (PBC). Next, they completed a survey about their choice intention between playing an online game and doing homework in three different situations, wherein a conflict between playing online games and doing homework was introduced and subjective norm was manipulated as peers supporting and parents objecting to playing online games. The results showed that adolescents’ attitude and PBC, as well as the perception of obtaining or not obtaining support from their peers and caregivers (manipulated subjective norm), significantly influenced their choice intention in online gaming situations. These findings contribute to the understanding of the factors affecting adolescents’ online gaming, which has been a concern of both caregivers and educators. With regard to the theoretical implications, this study extended previous work by providing evidence that TPB can be applied to analyze choice intention. Moreover, this study illuminated the effects of the separating factors of subjective norm on choice intention between playing online games and studying. PMID:28458649
Wang, Jia; Liu, Ru-De; Ding, Yi; Liu, Ying; Xu, Le; Zhen, Rui
2017-01-01
This study investigated how and why Chinese adolescents choose between playing online games and doing homework, using the model of the theory of planned behavior (TPB) in which the subjective norm was manipulated as two sub-elements (peer support and parental monitoring). A total of 530 students from an elementary school and a middle school in China were asked to complete the measures assessing two predictors of TPB: attitude and perceived behavioral control (PBC). Next, they completed a survey about their choice intention between playing an online game and doing homework in three different situations, wherein a conflict between playing online games and doing homework was introduced and subjective norm was manipulated as peers supporting and parents objecting to playing online games. The results showed that adolescents' attitude and PBC, as well as the perception of obtaining or not obtaining support from their peers and caregivers (manipulated subjective norm), significantly influenced their choice intention in online gaming situations. These findings contribute to the understanding of the factors affecting adolescents' online gaming, which has been a concern of both caregivers and educators. With regard to the theoretical implications, this study extended previous work by providing evidence that TPB can be applied to analyze choice intention. Moreover, this study illuminated the effects of the separating factors of subjective norm on choice intention between playing online games and studying.
Flying Cassini with Virtual Operations Teams
NASA Technical Reports Server (NTRS)
Dodd, Suzanne; Gustavson, Robert
1998-01-01
The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.
McKenzie River Focus Watershed Coordination: Year-End Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thrailkil, Jim
2000-01-01
This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management includemore » the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional funding from Council partner organizations and foundations. Highlights in the area of watershed education/outreach include the MWC's lead role in convening the Watershed Education Network for teachers as part of its educational mission; production of newsletters and brochures; and coordination of media coverage of watershed-related issues.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaivoda, Alexis
2003-11-01
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less
J. John Stadt; Jim Schieck; Harry Stelfox
2006-01-01
The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoverson, Eric D.; Amonette, Alexandra
The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) began its environmental investigations at Everest, Kansas, in 2000. The work at Everest is implemented on behalf of the CCC/USDA by Argonne National Laboratory, under the oversight of the Kansas Department of Health and Environment (KDHE). The results of the environmental investigations have been reported in detail (Argonne 2001, 2003, 2006a,b). The lateral extent of the carbon tetrachloride in groundwater over the years of investigation has been interpreted as shown in Figure 1.1 (2001-2002 data), Figure 1.2 (2006 data), Figure 1.3 (2008 data), and Figure 1.4 (2009 data). Themore » pattern of groundwater flow and inferred contaminant migration has consistently been to the north-northwest from the former CCC/USDA facility toward the Nigh property, and then west-southwest from the Nigh property (e.g., Figure 1.5 [2008 data] and Figure 1.6 [2009 data]). Both the monitoring data for carbon tetrachloride and the low groundwater flow rates estimated for the Everest aquifer unit (Argonne 2003, 2006a,b, 2008) indicate slow contaminant migration. On the basis of the accumulated findings, in March 2009 the CCC/USDA developed a plan for annual monitoring of the groundwater and surface water. This current monitoring plan (Appendix A in the report of monitoring in 2009 [Argonne 2010]) was approved by the KDHE (2009a). Under this plan, the monitoring wells are sampled by the low-flow procedure, and sample preservation, shipping, and analysis activities are consistent with previous work at Everest. The annual sampling will continue until identified conditions at the site indicate a technical justification for a change. The first annual sampling event under the new monitoring plan took place in April 2009. The results of analyses for volatile organic compounds (VOCs) and water level measurements were consistent with previous observations (Figures 1.1-1.4). No carbon tetrachloride was detected in surface water of the intermittent creek or in tree branch samples collected at 18 locations along the creek banks. The complete results were reported previously (Argonne 2010). This report presents the results of the second annual sampling events, conducted in 2010. Included in the 2010 monitoring were the following: (1) Continued automatic and manual monitoring of groundwater levels. (2) Groundwater sampling on April 8-9, 2010. (3) Surface water sampling on April 8, 2010. (4) Vegetation sampling on July 28, 2010. (5) Indoor air sampling at selected residences on August 11-12, 2010. The activities are described in Section 2, and the results are discussed in Section 3. Conclusions and recommendations are presented in Section 4.« less
A Planning Approach for Developing Inventory and Monitoring Programs In National Parks
David L. Peterson; David G. Silsbee; Daniel L. Schmoldt
1995-01-01
This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...
24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 52.346 - Air quality monitoring requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
Burton, R; Mauk, D
1993-03-01
By integrating customer satisfaction planning and industrial engineering techniques when examining internal costs and efficiencies, materiel managers are able to better realize what concepts will best meet their customers' needs. Defining your customer(s), applying industrial engineering techniques, completing work sampling studies, itemizing recommendations and benefits to each alternative, performing feasibility and cost-analysis matrixes and utilizing resources through productivity monitoring will get you on the right path toward selecting concepts to use. This article reviews the above procedures as they applied to one hospital's decision-making process to determine whether to incorporate a stockless inventory program. Through an analysis of customer demand, the hospital realized that stockless was the way to go, but not by outsourcing the function--the hospital incorporated an in-house stockless inventory program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoverson, Eric D.; Amonette, Alexandra
2008-12-02
The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Younkin, James R.; Garner, James R.
2017-04-01
Over the last five years, OLEM has been a collaborative development effort involving the IAEA, LANL, ORNL, URENCO, and the NNSA. The collective team has completed the following: design and modelling, software development, hardware integration, testing with the ORNL UF6 Flow Loop, a field trial at the Urenco facility in Almelo, the Netherlands, and a Demonstration at the Urenco USA facility in Eunice, New Mexico. This combined effort culminated in the deployment of several OLEM collection nodes in Iran. These OLEM units are one unattended monitoring system component of the Joint Comprehensive Plan of Action allowing the International Atomic Energymore » Agency to verify Iran’s compliance with the enrichment production aspects of the agreement.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less
2006-01-09
Water vapor surges from the flame deflector of the A-2 Test Stand at NASA's Stennis Space Center on Jan. 9 during the first space shuttle main engine test of the year. The test was an engine acceptance test of flight engine 2058. It's the first space shuttle main engine to be completely assembled at Kennedy Space Center. Objectives also included first-time (green run) tests of a high-pressure oxidizer turbo pump and an Advanced Health System Monitor engine controller. The test ran for the planned duration of 520 seconds.
2010-11-01
described the study design, study measures, st udy records to be kept, and the data safety and monitoring plan for protection of human subjects. On...KnowlegePanel 9 Miller, Suzanne were canvassed for participation in the st udy (see Table 1). Of th ese, 1085 agreed to participate, of whom 341...were d etermined to be eligib le. A tota l of 3 32 of the la tter completed the baseline survey, after which they were randomized in equal numbers to
NASA Systems Autonomy Demonstration Program - A step toward Space Station automation
NASA Technical Reports Server (NTRS)
Starks, S. A.; Rundus, D.; Erickson, W. K.; Healey, K. J.
1987-01-01
This paper addresses a multiyear NASA program, the Systems Autonomy Demonstration Program (SADP), whose main objectives include the development, integration, and demonstration of automation technology in Space Station flight and ground support systems. The role of automation in the Space Station is reviewed, and the main players in SADP and their roles are described. The core research and technology being promoted by SADP are discussed, and a planned 1988 milestone demonstration of the automated monitoring, operation, and control of a complete mission operations subsystem is addressed.
1999-02-01
from trials of complete systems at the other. This was perhaps reflected in answers to the questionnaire circulated to participants; more than half ...Cushing ~ • "A pile of facts is no more a science than a pile of bricks is a house." ~ J. Henri Poincare ~ • "Where is the wisdom we have lost in...Situation, • Diagnosis of the Situation, • Planing and Decision Making and • Plan Execution/Activation. Situation monitoring comprises the determination
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2013 CFR
2013-07-01
... to develop SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring... to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance...)(iv), (b)(2)(v) Actions taken to minimize emissions during SSM No. § 63.10(b)(2)(vi) Recordkeeping for...
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
Action Research to Support the Sustainability of Strategic Planning
ERIC Educational Resources Information Center
Antheil, Jane H.; Spinelli, Stephen, Jr.
2011-01-01
This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…
Preparation of regional shorebird monitoring plans
Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman
2005-01-01
Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...
Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.
2004-01-01
critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.
SU-E-T-473: A Patient-Specific QC Paradigm Based On Trajectory Log Files and DICOM Plan Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeMarco, J; McCloskey, S; Low, D
Purpose: To evaluate a remote QC tool for monitoring treatment machine parameters and treatment workflow. Methods: The Varian TrueBeamTM linear accelerator is a digital machine that records machine axis parameters and MLC leaf positions as a function of delivered monitor unit or control point. This information is saved to a binary trajectory log file for every treatment or imaging field in the patient treatment session. A MATLAB analysis routine was developed to parse the trajectory log files for a given patient, compare the expected versus actual machine and MLC positions as well as perform a cross-comparison with the DICOM-RT planmore » file exported from the treatment planning system. The parsing routine sorts the trajectory log files based on the time and date stamp and generates a sequential report file listing treatment parameters and provides a match relative to the DICOM-RT plan file. Results: The trajectory log parsing-routine was compared against a standard record and verify listing for patients undergoing initial IMRT dosimetry verification and weekly and final chart QC. The complete treatment course was independently verified for 10 patients of varying treatment site and a total of 1267 treatment fields were evaluated including pre-treatment imaging fields where applicable. In the context of IMRT plan verification, eight prostate SBRT plans with 4-arcs per plan were evaluated based on expected versus actual machine axis parameters. The average value for the maximum RMS MLC error was 0.067±0.001mm and 0.066±0.002mm for leaf bank A and B respectively. Conclusion: A real-time QC analysis program was tested using trajectory log files and DICOM-RT plan files. The parsing routine is efficient and able to evaluate all relevant machine axis parameters during a patient treatment course including MLC leaf positions and table positions at time of image acquisition and during treatment.« less
40 CFR 60.1060 - What steps must I complete for my materials separation plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What steps must I complete for my... Requirements: Materials Separation Plan § 60.1060 What steps must I complete for my materials separation plan? (a) For your materials separation plan, you must complete nine steps: (1) Prepare a draft materials...
4D modeling in high-rise construction
NASA Astrophysics Data System (ADS)
Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly
2018-03-01
High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.
Development of noSQL data storage for the ATLAS PanDA Monitoring System
NASA Astrophysics Data System (ADS)
Ito, H.; Potekhin, M.; Wenaus, T.
2012-12-01
For several years the PanDA Workload Management System has been the basis for distributed production and analysis for the ATLAS experiment at the LHC. Since the start of data taking PanDA usage has ramped up steadily, typically exceeding 500k completed jobs/day by June 2011. The associated monitoring data volume has been rising as well, to levels that present a new set of challenges in the areas of database scalability and monitoring system performance and efficiency. These challenges are being met with an R&D effort aimed at implementing a scalable and efficient monitoring data storage based on a noSQL solution (Cassandra). We present our motivations for using this technology, as well as data design and the techniques used for efficient indexing of the data. We also discuss the hardware requirements as they were determined by testing with actual data and realistic rate of queries. In conclusion, we present our experience with operating a Cassandra cluster over an extended period of time and with data load adequate for planned application.
Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan
ERIC Educational Resources Information Center
Mansell, Michelle
2010-01-01
The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…
40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frazier, William; Baur, Gary
Sampling Period: August 4, 2015. The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732, and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). The water level was measured at each sampled well. The water level in well 0733, located in the disposal cell, is lower than water levels in adjacent wells 0731 andmore » 0732, indicating a hydraulic gradient toward the disposal cell. Results from this sampling event were generally consistent with results from the past as shown in the attached concentration-versus-time graphs. There have been no large changes in contaminant concentration observed over the last several years with the following exception. The uranium concentration in well 0733 has been trending upward since 2003. High uranium concentrations are expected in this well because it is located in the disposal cell. The selenium concentrations observed in wells 0731 and 0732 are elevated when compared to the disposal cell 0733. Wells 0731 and 0732 are completed at the alluvium/Mancos contact; here, elevated selenium concentrations are expected due to contributions from the Mancos shale.« less
Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report
Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney
2016-01-01
The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conley, Will
2004-01-01
The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads assessment in the White Creek watershed (Task A4.2). Significant milestones associated with restoration projects during the reporting period included: (1) Completion of the Surveyors Fish Creek Passage Enhancement project (Task B2.3); (2) Completion of interagency agreements for the Klickitat Meadows (Task B2.4) and Klickitat Mill (Task B2.10) projects; (3) Completion of topographic surveys for the Klickitat Meadows (Task B2.4), Klickitat River Meadows (Task B2.5), Trout Creek and Bear Creek culvert replacements (Task B2.7), and Snyder Swale II (Task B2.13) projects; (4) Completion of the Snyder Swale II - Phase 1 project (Task B2.13); (5) Completion of design, planning, and permitting for the Klickitat Mill project (Task B2.10) and initiation of construction; (6) Design for the Trout and Bear Creek culverts (B2.7) were brought to the 60% level; and (7) Completion of design work for the for the Klickitat Meadows (Task B2.4) and Klickitat River Meadows (Task B2.5) projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less
A WebGIS platform for the monitoring of Farm Animal Genetic Resources (GENMON)
Flury, Christine; Matasci, Giona; Joerin, Florent; Widmer, Ivo; Joost, Stéphane
2017-01-01
Background In 2007, the Food and Agriculture Organization of the United Nations (FAO) initiated the Global plan of action for Farm Animal Genetic Resources (FAnGR). The main goal of this plan is to reduce further loss of genetic diversity in farm animals, so as to protect and promote the diversity of farm animal resources. An important step to reach this goal is to monitor and prioritize endangered breeds in the context of conservation programs. Methodology/Web portal implementation The GENMON WebGIS platform is able to monitor FAnGR and to evaluate the degree of endangerment of livestock breeds. The system takes into account pedigree and introgression information, the geographical concentration of animals, the cryo-conservation plan and the sustainability of breeding activities based on socio-economic data as well as present and future land use conditions. A multi-criteria decision tool supports the aggregation of the multi-thematic indices mentioned above using the MACBETH method, which is based on a weighted average using satisfaction thresholds. GENMON is a monitoring tool to reach subjective decisions made by a government agency. It relies on open source software and is available at http://lasigsrv2.epfl.ch/genmon-ch. Results/Significance GENMON allows users to upload pedigree-information (animal ID, parents, birthdate, sex, location and introgression) from a specific livestock breed and to define species and/or region-specific weighting parameters and thresholds. The program then completes a pedigree analysis and derives several indices that are used to calculate an integrated score of conservation prioritization for the breeds under investigation. The score can be visualized on a geographic map and allows a fast, intuitive and regional identification of breeds in danger. Appropriate conservation actions and breeding programs can thus be undertaken in order to promote the recovery of the genetic diversity in livestock breeds in need. The use of the platform is illustrated by means of an example based on three local livestock breeds from different species in Switzerland. PMID:28453561
A WebGIS platform for the monitoring of Farm Animal Genetic Resources (GENMON).
Duruz, Solange; Flury, Christine; Matasci, Giona; Joerin, Florent; Widmer, Ivo; Joost, Stéphane
2017-01-01
In 2007, the Food and Agriculture Organization of the United Nations (FAO) initiated the Global plan of action for Farm Animal Genetic Resources (FAnGR). The main goal of this plan is to reduce further loss of genetic diversity in farm animals, so as to protect and promote the diversity of farm animal resources. An important step to reach this goal is to monitor and prioritize endangered breeds in the context of conservation programs. The GENMON WebGIS platform is able to monitor FAnGR and to evaluate the degree of endangerment of livestock breeds. The system takes into account pedigree and introgression information, the geographical concentration of animals, the cryo-conservation plan and the sustainability of breeding activities based on socio-economic data as well as present and future land use conditions. A multi-criteria decision tool supports the aggregation of the multi-thematic indices mentioned above using the MACBETH method, which is based on a weighted average using satisfaction thresholds. GENMON is a monitoring tool to reach subjective decisions made by a government agency. It relies on open source software and is available at http://lasigsrv2.epfl.ch/genmon-ch. GENMON allows users to upload pedigree-information (animal ID, parents, birthdate, sex, location and introgression) from a specific livestock breed and to define species and/or region-specific weighting parameters and thresholds. The program then completes a pedigree analysis and derives several indices that are used to calculate an integrated score of conservation prioritization for the breeds under investigation. The score can be visualized on a geographic map and allows a fast, intuitive and regional identification of breeds in danger. Appropriate conservation actions and breeding programs can thus be undertaken in order to promote the recovery of the genetic diversity in livestock breeds in need. The use of the platform is illustrated by means of an example based on three local livestock breeds from different species in Switzerland.
Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper
McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.
2016-01-01
In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.
40 CFR 58.13 - Monitoring network completion.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 6 2012-07-01 2012-07-01 false Monitoring network completion. 58.13 Section 58.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.13 Monitoring network completion. (a...
40 CFR 58.13 - Monitoring network completion.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 6 2014-07-01 2014-07-01 false Monitoring network completion. 58.13 Section 58.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.13 Monitoring network completion. (a...
40 CFR 58.13 - Monitoring network completion.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 6 2013-07-01 2013-07-01 false Monitoring network completion. 58.13 Section 58.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.13 Monitoring network completion. (a...
The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments
NASA Astrophysics Data System (ADS)
Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul
2017-11-01
Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.
Chapter 3. Planning and design for habitat monitoring
Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein
2013-01-01
This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.
The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less
John Day Watershed Restoration Projects, annual report 2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Linda
The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Q; Read, P
Purpose: Multiple error pathways can lead to delivery errors during the treatment course that cannot be caught with pre-treatment QA. While in vivo solutions are being developed for linacs, no such solution exists for tomotherapy. The purpose of this study is to develop a near real-time system for tomotherapy that can monitor the delivery and dose accumulation process during the treatment-delivery, which enable the user to assess the impact of delivery variations and/or errors and to interrupt the treatment if necessary. Methods: A program running on a tomotherapy planning station fetches the raw DAS data during treatment. Exit detector datamore » is extracted as well as output, gantry angle, and other machine parameters. For each sample, the MLC open-close state is determined. The delivered plan is compared with the original plan via a Monte Carlo dose engine which transports fluence deviations from a pre-treatment Monte Carlo run. A report containing the difference in fluence, dose and DVH statistics is created in html format. This process is repeated until the treatment is completed. Results: Since we only need to compute the dose for the difference in fluence for a few projections each time, dose with 2% statistical uncertainty can be computed in less than 1 second on a 4-core cpu. However, the current bottleneck in this near real-time system is the repeated fetching and processing the growing DAS data file throughout the delivery. The frame rate drops from 10Hz at the beginning of treatment to 5Hz after 3 minutes and to 2Hz after 10 minutes. Conclusion: A during-treatment delivery monitor system has been built to monitor tomotherapy treatments. The system improves patient safety by allowing operators to assess the delivery variations and errors during treatment delivery and adopt appropriate actions.« less
Toche-Manley, Linda L.; Dietzen, Laura; Nankin, Jesse; Beigel, Astrid
2013-01-01
Among youth in child welfare ages 6 to 17, 40% meet criteria for one or more DSM diagnoses. For minority youth in child welfare, poor mental health is compounded by limited access to care and racial disparity bias, leading to poorer outcomes. This paper uses data collected and analyzed by an automated behavioral health assessment system for a multi-year study that focused on ways to improve case planning in child welfare. Youth, their caseworkers and, in some cases, parents completed assessments that measured and monitored the youths’ needs and strengths. More than 60% of youth participating in the study were African American; permanency rates after six months of case planning were found to be only one-third. Predictive factors related to better behavioral health and permanency outcomes are identified and discussed, as well as the implications for improving case planning by incorporating the views of multiple informants, including the youth. PMID:22566058
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.
A Data-Driven Diagnostic Framework for Wind Turbine Structures: A Holistic Approach
Bogoevska, Simona; Spiridonakos, Minas; Chatzi, Eleni; Dumova-Jovanoska, Elena; Höffer, Rudiger
2017-01-01
The complex dynamics of operational wind turbine (WT) structures challenges the applicability of existing structural health monitoring (SHM) strategies for condition assessment. At the center of Europe’s renewable energy strategic planning, WT systems call for implementation of strategies that may describe the WT behavior in its complete operational spectrum. The framework proposed in this paper relies on the symbiotic treatment of acting environmental/operational variables and the monitored vibration response of the structure. The approach aims at accurate simulation of the temporal variability characterizing the WT dynamics, and subsequently at the tracking of the evolution of this variability in a longer-term horizon. The bi-component analysis tool is applied on long-term data, collected as part of continuous monitoring campaigns on two actual operating WT structures located in different sites in Germany. The obtained data-driven structural models verify the potential of the proposed strategy for development of an automated SHM diagnostic tool. PMID:28358346
A project for monitoring trends in burn severity
Eidenshink, Jeffery C.; Schwind, Brian; Brewer, Ken; Zhu, Zhu-Liang; Quayle, Brad; Howard, Stephen M.
2007-01-01
Jeff Eidenshink, Brian Schwind, Ken Brewer, Zhi-Liang Zhu, Brad Quayle, and Elected officials and leaders of environmental agencies need information about the effects of large wildfires in order to set policy and make management decisions. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates the National Fire Plan (NFP) and Federal Wildland Fire Management Policies (National Fire Plan 2004), adopted a strategy to monitor the effectiveness of the National Fire Plan and the Healthy Forests Restoration Act (HFRA). One component of this strategy is to assess the environmental impacts of large wildland fires and identify the trends of burn severity on all lands across the United States. To that end, WFLC has sponsored a six-year project, Monitoring Trends in Burn Severity (MTBS), which requires the U.S. Department of Agriculture Forest Service (USDA-FS) and the U.S. Geological Survey (USGS) to map and assess the burn severity for all large current and historical fires. Using Landsat data and the differenced Normalized Burn Ratio (dNBR) algorithm, the USGS Center for Earth Resources Observation and Science (EROS) and USDA-FS Remote Sensing Applications Center will map burn severity of all fires since 1984 greater than 202 ha (500ac) in the east, and 404 ha (1,000 ac) in the west. The number of historical fires from this period combined with current fires occurring during the course of the project will exceed 9,000. The MTBS project will generate burn severity data, maps, and reports, which will be available for use at local, state, and national levels to evaluate trends in burn severity and help develop and assess the effectiveness of land management decisions. Additionally, the information developed will provide a baseline from which to monitor the recovery and health of fire-affected landscapes over time. Spatial and tabular data quantifying burn severity will augment existing information used to estimate risk associated with a range of current and future resource threats. The annual report of 2004 fires has been completed. All data and results will be distributed to the public on a Web site. A Project for Monitoring Trends in Burn Severity
NASA Astrophysics Data System (ADS)
Zdeb, T. F.
2012-12-01
Preparing a Perimeter Air Monitoring Plan that provides the essential information and methods of evaluation needed to assure that the health of the surrounding community is adequately protected and adapting currently existing Cal/OSHA regulations to be relevant to the protection of workers at sites involving the excavation of Naturally Occurring Asbestos (NOA) is oftentimes challenging in California. Current guidelines regarding what constitutes an effective air monitoring program are often lacking in details regarding what should be sampled and analyzed to characterize a site and what evaluation techniques should be applied to process the results of monitoring, and the current Cal/OSHA asbestos related regulations regarding worker protection are for the most part largely pertinent to the abatement of asbestos in buildings. An overview of the essential components of an effective Baseline and Perimeter Air Monitoring Plan will be presented that includes a brief discussion of the various asbestos types and fiber sizes that may need to be considered, possible approachs for evaluating temporal and spatial variability, review of selected site boundary target concentrations, and consideration of the potential for airborne dust and soil containing asbestos (and other contaminants) to migrate and accumulate offsite eventually contributing to "background creep" --the incremental increase of overall airborne asbestos concentrations in the areas surrounding the site due to the re-entrainment of asbestos from the settled dust and/or transported soil. In addition to the above, the current Cal/OSHA asbestos regulations related to worker protection will be briefly discussed with respect to their relevancy at NOA sites with an overview of the adaptations to the regulations that were developed as a result of some fairly lengthy discussions with representatives of Cal/OSHA. These adaptations include, among other things, defining how regulated areas (asbestos concentrations over 1%) and "provisionally regulated" areas (less than 1%) are established and treated, what variables need to be considered when attempting to complete a personal exposure assessment, Cal/OSHA Permissible Exposure Limits (PELs) versus site specific permissible exposure limits, allowable work practices, and the qualifications of personnel performing the sampling and analyses of data.
40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...
40 CFR 58.13 - Monitoring network completion.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Monitoring network completion. 58.13... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.13 Monitoring network completion. (a) The network of NCore multipollutant sites must be physically established no later than January 1, 2011...
40 CFR 58.13 - Monitoring network completion.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Monitoring network completion. 58.13... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.13 Monitoring network completion. (a) The network of NCore multipollutant sites must be physically established no later than January 1, 2011...
Late-successional forests and northern spotted owls: how effective is the Northwest Forest Plan?
Miles Hemstrom; Martin G. Raphael
2000-01-01
This paper describes the late-successional and old-growth forest and the northern spotted owl effectiveness monitoring plans for the Northwest Forest Plan. The effectiveness monitoring plan for late-successional and old-growth forests will track changes in forest spatial distribution, and within-stand structure and composition, and it will predict future trends.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory... carrying out its responsibilities for monitoring DOE's waste disposal activities at the F-Area Tank Farm at... the availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by...
Physicians' Perspectives on the Diagnosis and Treatment of Chronic Nonbacterial Osteomyelitis.
Zhao, Yongdong; Dedeoglu, Fatma; Ferguson, Polly J; Lapidus, Sivia K; Laxer, Ronald M; Bradford, Miranda C; Li, Suzanne C
2017-01-01
Background/Purpose . Understanding the practices of pediatric rheumatologists in diagnosing and treating chronic nonbacterial osteomyelitis (CNO) can provide important information to guide the development of consensus treatment plans. The objectives of this study were to determine physicians' approaches to (1) diagnosing and monitoring CNO, (2) ordering a bone biopsy, and (3) making treatment decisions. Methods . A survey was distributed among members of the Childhood Arthritis and Rheumatology Research Alliance using a web-based questionnaire. Results . 121 of 277 (41%) attending physician members completed the survey. Plain radiographs (89%) were most commonly used followed by regional MRI (78%), bone scintigraphy (43%), and whole-body MRI (36%). The top three reasons for performing a biopsy were constitutional findings (66%), unifocal bone lesions (64%), and nocturnal bone pain (45%). Nearly all responders (95%) prescribed nonsteroidal anti-inflammatory drugs (NSAIDs) as initial therapy. For patients who failed NSAID treatment, methotrexate (67%), tumor necrosis factor inhibitors (65%), and bisphosphonates (46%) were the next most commonly used treatments. The presence of a spinal lesion increased the use of bisphosphonate treatment. Conclusion . The diagnostic approach and disease activity monitoring for CNO varied among surveyed physicians. Our survey findings provided important background for the development of consensus treatment plans for CNO.
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.; Lantow, Tiffany A.
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less
Choosing indicators of natural resource condition: A case study in Arches National Park, Utah, USA
Belnap, J.
1998-01-01
Heavy visitor use in many areas of the world have necessitated development of ways to assess visitation impacts. Arches National Park recently completed a Visitor Experience and Resource Protection (VERP) plan. Integral to this plan was developing a method to identify biological indicators that would both measure visitor impacts and response to management actions. The process used in Arches for indicator selection is outlined here as a model applicable to many areas facing similar challenges. The steps were: (1) Vegetation types most used by visitors were identified. Impacted and unimpacted areas in these types were sampled, comparing vegetation and soil factors. (2) Variables found to differ significantly between compared sites were used as potential indicators. (3) Site-specific criteria for indicators were developed, and potential indicators evaluated using these criteria. (4) Chosen indicators were further researched for ecological relevancy. (5) Final indicators were chosen, field tested, and monitoring sites designated. In Arches, indicators were chosen for monitoring annually (soil crust index, soil compaction, number of used social trails and soil aggregate stability) and every five years (vegetation cover and frequency; ground cover; soil chemistry; and plant tissue chemistry).
Epidemiological Studies to Support the Development of Next Generation Influenza Vaccines.
Petrie, Joshua G; Gordon, Aubree
2018-03-26
The National Institute of Allergy and Infectious Diseases recently published a strategic plan for the development of a universal influenza vaccine. This plan focuses on improving understanding of influenza infection, the development of influenza immunity, and rational design of new vaccines. Epidemiological studies such as prospective, longitudinal cohort studies are essential to the completion of these objectives. In this review, we discuss the contributions of epidemiological studies to our current knowledge of vaccines and correlates of immunity, and how they can contribute to the development and evaluation of the next generation of influenza vaccines. These studies have been critical in monitoring the effectiveness of current influenza vaccines, identifying issues such as low vaccine effectiveness, reduced effectiveness among those who receive repeated vaccination, and issues related to egg adaptation during the manufacturing process. Epidemiological studies have also identified population-level correlates of protection that can inform the design and development of next generation influenza vaccines. Going forward, there is an enduring need for epidemiological studies to continue advancing knowledge of correlates of protection and the development of immunity, to evaluate and monitor the effectiveness of next generation influenza vaccines, and to inform recommendations for their use.
Computerized fracture critical and specialized bridge inspection program with NDE applications
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1998-03-01
Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
Completable scheduling: An integrated approach to planning and scheduling
NASA Technical Reports Server (NTRS)
Gervasio, Melinda T.; Dejong, Gerald F.
1992-01-01
The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.
1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less
Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan
1993-10-01
5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water
Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions
NASA Technical Reports Server (NTRS)
Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.
2006-01-01
With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and regeneration systems, increasing the need for environmental monitoring. Almost complete crew autonomy will be needed for assessment and remediation of contamination problems. Cabin capacity will be limited; thus, current methods of microbial monitoring will be inadequate. Future methodology must limit consumables, and these consumables must have a shelf life of over three years. In summary, missions to the moon and Mars will require a practical design that prudently uses available resources to mitigate microbial risk to the crew.
Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael Tehan
2004-01-01
An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...
Mark H. Huff; Martin G. Raphael; Sherri L. Miller; S. Kim Nelson; Jim Baldwin
2006-01-01
The Northwest Forest Plan (the Plan) is a large-scale ecosystem management plan for federal land in the Pacific Northwest. Marbled murrelet (Brachyramphus marmoratus) populations and habitat were monitored to evaluate effectiveness of the Plan. The chapters in this volume summarize information on marbled murrelet ecology and present the monitoring...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...
78 FR 63962 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
...: Scientific research, monitoring or habitat restoration exceptions, state and individual research plans... research, scientific monitoring, and fisheries activities conducted under an approved 4(d) program or plan..., 5 or 20 hours, depending on the research or plan. Burden Hours: 1,760. Needs and Uses: This request...
DOT National Transportation Integrated Search
2011-09-06
Active Transportation in the form of bicycle and pedestrian traffic, is monitored for the Austin-Round Rock-San Marcos, TX region by the Capital Area Metropolitan Planning Organization using a variety of methods: automatic, manual and surveyed. This ...
Test/QA Plan (TQAP) for Verification of Semi-Continuous Ambient Air Monitoring Systems
The purpose of the semi-continuous ambient air monitoring technology (or MARGA) test and quality assurance plan is to specify procedures for a verification test applicable to commercial semi-continuous ambient air monitoring technologies. The purpose of the verification test is ...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.330 Section 91.330 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Consolidated Plan § 91.330 Monitoring. The consolidated plan must describe the standards and procedures that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.430 Section 91.430 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Plan § 91.430 Monitoring. The consolidated plan must describe the standards and procedures that the...
Amponsah, Kwame; Ellis, Thomas L; Chan, Michael D; Lovato, James F; Bourland, J Daniel; deGuzman, Allan F; Ekstrand, Kenneth E; Munley, Michael T; McMullen, Kevin P; Shaw, Edward G; Tatter, Stephen B
2012-10-01
It has been well established that Gamma Knife radiosurgery (GKS) is an effective treatment for brain arteriovenous malformations (AVMs). To evaluate complete obliteration rates for magnetic resonance imaging (MRI)-based GKS treatment planning performed with and without angiography and to conduct a preliminary assessment of the utility of using pulsed arterial spin labeling (PASL) magnetic resonance (MR) perfusion imaging to confirm complete obliteration. Forty-six patients were identified who had undergone GKS without embolization with a minimum follow-up of 2 years. One group was planned with integrated stereotactic angiography and MR (spoiled gradient recalled) images obtained on the day of GKS. A second technique avoided the risk of arteriography by using only axial MR images. Beginning in 2007, PASL MR perfusion imaging was routinely performed as a portion of the follow-up MRI to assess the restoration of normal blood flow of the nidus and surrounding area. The overall obliteration rate for the angiography/MRI group was 88.0% (29 of 33). Patients in the MRI-only group had an obliteration rate of 61.5% (8 of 13), with P=.092 with the Fisher exact test, which is not statistically significant. A Kaplan-Meier analysis was also not statistically significant (log rank test, P=.474). Four of 9 patients with incomplete obliteration on angiography also had shown residual abnormal blood flow on PASL imaging. This retrospective analysis shows that treatment planning technique used in GKS does not play a role in the eventual obliteration of treated AVMs. PASL may have potential in the evaluation of AVM obliteration.
Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry
2003-06-09
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less
An integrated decision support system for TRAC: A proposal
NASA Technical Reports Server (NTRS)
Mukkamala, Ravi
1991-01-01
Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiehagen, J.; Del Bianco, M.; Mallay, D.
2015-05-22
The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Syh, J; Ding, X; Syh, J
2015-06-15
Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less
36 CFR 219.30 - Plan documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...
This document describes three general approaches to the design of a sampling plan for biological monitoring of coral reefs. Status assessment, trend detection and targeted monitoring each require a different approach to site selection and statistical analysis. For status assessm...
40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...
40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...
77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... Plan for Federal Research and Monitoring of Ocean Acidification AGENCY: National Marine Fisheries... Federal Research and Monitoring of Ocean Acidification is being made available for public review and... understanding of the process of ocean acidification, its effects on marine ecosystems, and the steps that could...
300 area TEDF NPDES Permit Compliance Monitoring Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1995-09-05
This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.
Developing and Monitoring Individual Education Plans for Handicapped Children.
ERIC Educational Resources Information Center
Armstrong, Mary Lee
The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…
Hydrologic data and description of a hydrologic monitoring plan for the Borax Lake area, Oregon
Schneider, Tiffany Rae; McFarland, William D.
1995-01-01
Information from field visits was used to develop a monitoring plan. The plan would include monitoring Borax Lake by measuring discharge, stage, evaporation, temperature, and specific conductance; water-quality sampling and analysis; and monitoring shallow ground-water levels near Borax Lake using shallow piezometers. Minimally, one hot spring in North Borax Lake Spring Group 1 would be monitored for temperature and specific conductance and sampled for water-quality analysis. In addition, two flowing wells would be monitored for water levels, temperature, specific conductance, and discharge and sampled for water-quality analysis. The construction characteristics of these wells must be verified before long-term data collection begins. In the future, it may be helpful to monitor shallow and (or) deep observation wells drilled into the thermal aquifer to understand the possible effects of geothermal development on Borax Lake and nearby springs.
Late-successional and old-growth forest effectiveness monitoring plan for the Northwest Forest Plan.
Miles Hemstrom; Thomas Spies; Craig Palmer; Ross Kiester; John Teply; Phil McDonald; Ralph. Warbington
1998-01-01
This report presents options for long-term effectiveness monitoring of late-successional and old-growth forests under the Northwest Forest Plan. It describes methods to answer questions about how much late-successional forest exists on Federal land, its pattern, how itâs changing, and if the Forest Plan is providing for its conservation and management. It specifies...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, usingmore » driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.« less
Monitoring InBaskets With Feedback to Providers Enhances the Timeliness of Patient Care.
Trant, Amelia A; Strait, Michael; Kaplan, Rory; Dest, Vanna; Roshka, Adam; Lyons, Catherine A; Vest, Kevin A; Steffen, Tessa; Chiang, Anne; Adelson, Kerin B
2018-05-01
Electronic health records have changed providers' workflow. Epic's InBasket supplants traditional communication and is a central hub for clinical information. Failure to promptly complete records impairs communication and revenue collection. By tracking providers' InBasket activities and offering feedback, we hoped to improve InBasket management and interdisciplinary communication. We created a report to track 273 providers' InBasket activities, including ambulatory transcriptions, chart cosignatures, order cosignatures, patient calls, results, and billable encounters. The report showed how often and for how long each activity was delinquent. We completed three Plan-Do-Study-Act cycles. During cycle 1 (November to December 2015), we sent all providers automated e-mails with their monthly results. During cycle 2 (January to April 2016), we focused solely on billable encounter closure and sent targeted e-mails to providers with > 50 delinquent encounters. The e-mails stated that providers had 30 days to complete encounters or their practices would be closed to new patients; at 30 days, noncompliant providers had 60 days before practice suspension. During cycle 3 (May to September 2016), we continued to monitor and send targeted e-mails to providers who accumulated > 50 encounters. We modeled the financial impact of the intervention using net closure data, the report's aging function, and billing logs. InBasket monitoring with structured feedback decreased open encounters by 53.43%. We did not see improvements in the other metrics that the report tracked. We estimate that $231,724 was saved as a result of the intervention and $349,179 was lost to filing deadlines. Automated e-mails did not reduce open encounters; targeted e-mails to providers improved InBasket management.
Morimoto, Yoshihito; Takei, Hidefumi; Tachibana, Keisei; Nakazato, Yoko; Tanaka, Ryota; Nagashima, Yasushi; Watanabe, Kazuhiro; Seki, Reisuke; Shinohara, Takao; Kondo, Haruhiko
2018-01-01
Adjuvant cisplatin-vinorelbine chemotherapy has been shown to be effective in patients with completely resected non-small cell lung cancer (NSCLC) in several Phase III trials, but not yet in the Japanese population. Pharmacists are expected to assist patients with completion of adjuvant chemotherapy. The aim of this retrospective study was to evaluate the compliance with and safety of adjuvant cisplatin-vinorelbine chemotherapy in Japanese patients and to evaluate the contribution of pharmacists to completion of treatment. Thirty-four patients with NSCLC who received adjuvant cisplatin-vinorelbine chemotherapy at Kyorin University Hospital between January 2006 and June 2015 were reviewed. The treatment schedule comprised cisplatin 80 mg/m 2 on day 1 and vinorelbine 25 mg/m 2 on days 1 and 8 every 3 weeks. Four 3-week cycles were planned. A pharmacist provided guidance to all patients and monitored them for adverse effects thereafter. The pharmacist intervened with advice to doctors as necessary. The 4 cycles were administered in 67.6% of cases. There were no treatment-related deaths. The main grade 3 or 4 toxicities were neutropenia (76.5%) and anorexia (38.2%). The most common reason for discontinuation and dose reduction was anorexia. There were 56 instances of pharmacist intervention. In total, 96.4% of the pharmacist interventions were implemented by doctors, which included administration of an antiemetic on 15 occasions and hot fomentation for prevention of vasculitis on 7 occasions. Adjuvant cisplatin-vinorelbine chemotherapy was tolerated by most patients but was discontinued because of adverse events in some. Pharmacist intervention aids completion of planned chemotherapy and management of treatment-related adverse events.
Buck Louis, Germaine M; Schisterman, Enrique F; Sweeney, Anne M; Wilcosky, Timothy C; Gore-Langton, Robert E; Lynch, Courtney D; Boyd Barr, Dana; Schrader, Steven M; Kim, Sungduk; Chen, Zhen; Sundaram, Rajeshwari
2011-09-01
The relationship between the environment and human fecundity and fertility remains virtually unstudied from a couple-based perspective in which longitudinal exposure data and biospecimens are captured across sensitive windows. In response, we completed the LIFE Study with methodology that intended to empirically evaluate a priori purported methodological challenges: implementation of population-based sampling frameworks suitable for recruiting couples planning pregnancy; obtaining environmental data across sensitive windows of reproduction and development; home-based biospecimen collection; and development of a data management system for hierarchical exposome data. We used two sampling frameworks (i.e., fish/wildlife licence registry and a direct marketing database) for 16 targeted counties with presumed environmental exposures to persistent organochlorine chemicals to recruit 501 couples planning pregnancies for prospective longitudinal follow-up while trying to conceive and throughout pregnancy. Enrolment rates varied from <1% of the targeted population (n = 424,423) to 42% of eligible couples who were successfully screened; 84% of the targeted population could not be reached, while 36% refused screening. Among enrolled couples, ∼ 85% completed daily journals while trying; 82% of pregnant women completed daily early pregnancy journals, and 80% completed monthly pregnancy journals. All couples provided baseline blood/urine samples; 94% of men provided one or more semen samples and 98% of women provided one or more saliva samples. Women successfully used urinary fertility monitors for identifying ovulation and home pregnancy test kits. Couples can be recruited for preconception cohorts and will comply with intensive data collection across sensitive windows. However, appropriately sized sampling frameworks are critical, given the small percentage of couples contacted found eligible and reportedly planning pregnancy at any point in time. © Published 2011. This article is a US Government work and is in the public domain in the USA.
Madej, Mary Ann; Torregrosa, Alicia; Woodward, Andrea
2012-01-01
On Thursday, May 3, 2012, a science workshop was held at the Redwood National and State Parks (RNSP) office in Arcata, California, with researchers and resource managers working in RNSP to share data and expert opinions concerning salmon populations and habitat in the Redwood Creek watershed. The focus of the workshop was to discuss how best to synthesize physical and biological data related to the freshwater and estuarine phases of salmon life cycles in order to increase the understanding of constraints on salmon populations. The workshop was hosted by the U.S. Geological Survey (USGS) Status and Trends (S&T) Program National Park Monitoring Project (http://www.fort.usgs.gov/brdscience/ParkMonitoring.htm), which supports USGS research on priority topics (themes) identified by the National Park Service (NPS) Inventory and Monitoring Program (I&M) and S&T. The NPS has organized more than 270 parks with significant natural resources into 32 Inventory and Monitoring (I&M) Networks (http://science.nature.nps.gov/im/networks.cfm) that share funding and core professional staff to monitor the status and long-term trends of selected natural resources (http://science.nature.nps.gov/im/monitor). All 32 networks have completed vital signs monitoring plans (available at http://science.nature.nps.gov/im/monitor/MonitoringPlans.cfm), containing background information on the important resources of each park, conceptual models behind the selection of vital signs for monitoring the condition of natural resources, and the selection of high priority vital signs for monitoring. Vital signs are particular physical, chemical, and biological elements and processes of park ecosystems that represent the overall health or condition of the park, known or hypothesized effects of stressors, or elements that have important human values (Fancy and others, 2009). Beginning in 2009, the I&M program funded projects to analyze and synthesize the biotic and abiotic data generated by vital signs monitoring and previous in-park natural resource monitoring and inventories to provide useful information, models, and tools to park managers for addressing resource management issues. The workshop described in this report is an element of the project funded by USGS NPS-I&M program to conduct a synthesis of salmon-related datasets in the Klamath (KLMN) and San Francisco Bay Area (SFAN) networks of national parks. The synthesis focused on four park units: Redwood National Park (KLMN), Point Reyes National Seashore, Muir Woods National Monument, and Golden Gate National Recreation Area (SFAN).
On the role of model-based monitoring for adaptive planning under uncertainty
NASA Astrophysics Data System (ADS)
Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn
2016-04-01
Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.
Bailey, A N; Porter, K J; Hill, J L; Chen, Y; Estabrooks, P A; Zoellner, J M
2016-08-01
SIPsmartER is a 6-month behavioral intervention designed using a health literacy universal precautions approach that has been found effective at reducing sugary beverage intake in rural, low socioeconomic adults. The purpose of this mixed-methods study is to determine if health literacy status influenced participants' satisfaction and perceptions of each intervention component: small group classes, interactive-voice response (IVR) calls, personal action plans and self-monitoring logs. Of the 155 participants enrolled in SIPsmartER, 105 (68%) completed an interview-administered summative evaluation including 68 high and 37 low health literate participants. The quantitative findings show participant satisfaction with each intervention component was high (i.e. classes = 9.6, IVR calls = 8.1, action plans = 8.9-9.1, logs = 8.7 on a 10-point scale) and similar across both health literacy groups. The majority of qualitative responses were positive (81.8%) and code counts were comparable between literacy groups with a few exceptions. As compared with high health literacy respondents, low health literacy respondents more frequently mentioned liking the content and length of IVR calls, liking the motivational aspects of the personal action plans, and identified numeracy issues with the self-monitoring logs. Overall, applying a health literacy universal precautions approach is an effective and acceptable strategy for both high and low health literacy groups. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please email: journals.permissions@oup.com.
Priority actions for addressing the obesity epidemic in England.
Watson, Fiona; Taylor, Anna; Rayner, Mike; Lobstein, Tim; Hinks, Robin
2018-04-01
To prioritise policy actions for government to improve the food environment and contribute to reduced obesity and related diseases. Cross-sectional study applying the Food Environment Policy Index (Food EPI) in two stages. First, the evidence on all relevant policies was compiled, through an Internet search of government documents, and reviewed for accuracy and completeness by government officials. Second, independent experts were brought together to identify critical gaps and prioritise actions to fill those gaps, through a two-stage rating process. England. A total of seventy-three independent experts from forty-one organisations were involved in the exercise. The top priority policy actions for government identified were: (i) control the advertising of unhealthy foods to children; (ii) implement the levy on sugary drinks; (iii) reduce the sugar, fat and salt content in processed foods (leading to an energy reduction); (iv) monitor school and nursery food standards; (v) prioritise health and the environment in the 25-year Food and Farming Plan; (vi) adopt a national food action plan; (vii) monitor the food environment; (viii) apply buying standards to all public institutions; (ix) strengthen planning laws to discourage less healthy food offers; and (x) evaluate food-related programmes and policies. Applying the Food EPI resulted in agreement on the ten priority actions required to improve the food environment. The Food EPI has proved to be a useful tool in developing consensus for action to address the obesity epidemic among a broad group of experts in a complex legislative environment.
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth
2018-01-01
The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544
When goals collide: monitoring the goals of multiple characters.
Magliano, Joseph P; Taylor, Holly A; Kim, Hyun-Jeong Joyce
2005-12-01
Most story plots contain multiple characters who are independent, interact, and often have conflicting goals. One would expect that narrative understanding would require monitoring of the goals, concerns, and situations of multiple agents. There is considerable evidence that understanders monitor the primary protagonist's goal plans (e.g., Suh & Trabasso, 1993). However, there is relatively little research on the extent to which understanders monitor the goals of multiple agents. We investigated the impact of characters' roles and prominence on the extent to which understanders monitor the goal plans of multiple characters in a feature length film. In Experiment 1, participants made situation change judgments, and in Experiment 2, they verbally described scenes. Both types of judgments indicated that viewers monitor the goals and plans of multiple agents but do so to a greater extent for characters more prominent to the plotline.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oldenburg, Curtis M.; Birkholzer, Jens T.
The Cap-and-Trade and Low Carbon Fuel Standard (LCFS) programs being administered by the California Air Resources Board (CARB) include Carbon Dioxide Capture and Storage (CCS) as a potential means to reduce greenhouse gas (GHG) emissions. However, there is currently no universal standard approach that quantifies GHG emissions reductions for CCS and that is suitable for the quantitative needs of the Cap-and-Trade and LCFS programs. CCS involves emissions related to the capture (e.g., arising from increased energy needed to separate carbon dioxide (CO 2) from a flue gas and compress it for transport), transport (e.g., by pipeline), and storage of COmore » 2 (e.g., due to leakage to the atmosphere from geologic CO 2 storage sites). In this project, we reviewed and compared monitoring, verification, and accounting (MVA) protocols for CCS from around the world by focusing on protocols specific to the geologic storage part of CCS. In addition to presenting the review of these protocols, we highlight in this report those storage-related MVA protocols that we believe are particularly appropriate for CCS in California. We find that none of the existing protocols is completely appropriate for California, but various elements of all of them could be adopted and/or augmented to develop a rigorous, defensible, and practical surface leakage MVA protocol for California. The key features of a suitable surface leakage MVA plan for California are that it: (1) informs and validates the leakage risk assessment, (2) specifies use of the most effective monitoring strategies while still being flexible enough to accommodate special or site-specific conditions, (3) quantifies stored CO 2, and (4) offers defensible estimates of uncertainty in monitored properties. California’s surface leakage MVA protocol needs to be applicable to the main CO 2 storage opportunities (in California and in other states with entities participating in California’s Cap-and-Trade or LCFS programs), specifically CO 2-enhanced oil recovery (CO 2-EOR), CO 2 injection into depleted gas reservoirs (with or without CO 2-enhanced gas recovery (CO 2-EGR)), as well as deep saline storage. Regarding the elements of an effective surface leakage MVA protocol, our recommendations for California are that: (1) both CO 2 and methane (CH 4) surface leakage should be monitored, especially for enhanced recovery scenarios, (2) emissions from all sources not directly related to injection and geologic storage (e.g., from capture, or pipeline transport) should be monitored and reported under a plan separate from the surface leakage MVA plan that is included as another component of the quantification methodology (QM), (3) the primary objective of the surface leakage MVA plan should be to quantify surface leakage of CO 2 and CH 4 and its uncertainty, with consideration of best-practices and state-of-the-art approaches to monitoring including attribution assessment, (4) effort should be made to monitor CO 2 storage and migration in the subsurface to anticipate future surface leakage monitoring needs, (5) detailed descriptions of specific monitoring technologies and approaches should be provided in the MVA plan, (6) the main purpose of the CO 2 injection project (CO 2-EOR, CO 2-EGR, or pure geologic carbon sequestration (GCS)) needs to be stated up front, (7) approaches to dealing with missing data and quantifying uncertainty need to be described, and (8) post-injection monitoring should go on for a period consistent with or longer than that prescribed by the U.S. EPA.« less
Enhance wound healing monitoring through a thermal imaging based smartphone app
NASA Astrophysics Data System (ADS)
Yi, Steven; Lu, Minta; Yee, Adam; Harmon, John; Meng, Frank; Hinduja, Saurabh
2018-03-01
In this paper, we present a thermal imaging based app to augment traditional appearance based wound growth monitoring. Accurate diagnose and track of wound healing enables physicians to effectively assess, document, and individualize the treatment plan given to each wound patient. Currently, wounds are primarily examined by physicians through visual appearance and wound area. However, visual information alone cannot present a complete picture on a wound's condition. In this paper, we use a smartphone attached thermal imager and evaluate its effectiveness on augmenting visual appearance based wound diagnosis. Instead of only monitoring wound temperature changes on a wound, our app presents physicians a comprehensive measurements including relative temperature, wound healing thermal index, and wound blood flow. Through the rat wound experiments and by monitoring the integrated thermal measurements over 3 weeks of time frame, our app is able to show the underlying healing process through the blood flow. The implied significance of our app design and experiment includes: (a) It is possible to use a low cost smartphone attached thermal imager for added value on wound assessment, tracking, and treatment; and (b) Thermal mobile app can be used for remote wound healing assessment for mobile health based solution.
Plan execution monitoring with distributed intelligent agents for battle command
NASA Astrophysics Data System (ADS)
Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.
2004-07-01
As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...
Establishing a regional monitoring strategy: The Pacific Northwest Forest Plan
Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett
1999-01-01
This paper identifies lessons learned and issues raised during the development of an ecosystem monitoring strategy intended to support the Northwest Forest Plan. Adaptive ecosystem management, which requires monitoring as essential feedback to management, recognizes that action is necessary or appropriate, although knowledge may be imperfect. We suggest that this...
Deutsch, Alan; Siegel, Emma; Cations, Monica; Wright, Clive; Naganathan, Vasi; Brodaty, Henry
2017-12-01
This 10 weeks feasibility study investigated whether residential care nurses with 12 hours advanced oral health training in assessments and saliva testing could formulate, implement and monitor individualised oral care plans of early dementia residents. Four trained lead advocate nurses using SXI-D, OHIP14, oral health assessment tool (OHAT) assessments and a modified saliva test formulated nurse scheduled comprehensive oral care plans (NSCOCPs) by selecting and scheduling preventive products and procedures multiple times throughout the day to alkalise the mouth of 8 residents as an adjunct to assisted brushing and high-fluoride toothpaste. Nurse assessments, saliva tests and care plans were validated against oral health therapist (OHT) findings. Care plan agreement between Nurse and OHT intervention selection and scheduling was high (75%-88%). Untrained nurse compliance was very high, 86%-99% for the 4930 scheduled interventions. Untrained nurses delivered multiple scheduled interventions by following NSCOCPs despite initially not understanding the reason for each of 9 interventions categories. NSCOCPs could track and monitor whether a recommended intervention had been completed by general nursing staff over 3 nursing shifts. The role of nurses may have to be expanded beyond traditional roles to meet the growth and changes in oral health needs in residential facilities. Intensive training of a few lead advocate nurses to assess risk and formulate individualised NSCOCPs provides a method to transfer knowledge to untrained staff and deliver multicomponent preventive interventions soon after entry into residential care where timely visits by dental professionals to examine residents and prescribe preventive interventions are infrequent or unlikely. © 2017 John Wiley & Sons A/S and The Gerodontology Association. Published by John Wiley & Sons Ltd.
Pezzoli, L; Tchio, R; Dzossa, A D; Ndjomo, S; Takeu, A; Anya, B; Ticha, J; Ronveaux, O; Lewis, R F
2012-01-01
We used the clustered lot quality assurance sampling (clustered-LQAS) technique to identify districts with low immunization coverage and guide mop-up actions during the last 4 days of a combined oral polio vaccine (OPV) and yellow fever (YF) vaccination campaign conducted in Cameroon in May 2009. We monitored 17 pre-selected districts at risk for low coverage. We designed LQAS plans to reject districts with YF vaccination coverage <90% and with OPV coverage <95%. In each lot the sample size was 50 (five clusters of 10) with decision values of 3 for assessing OPV and 7 for YF coverage. We 'rejected' 10 districts for low YF coverage and 14 for low OPV coverage. Hence we recommended a 2-day extension of the campaign. Clustered-LQAS proved to be useful in guiding the campaign vaccination strategy before the completion of the operations.
Bratina, Natasa; Battelino, Tadej
2010-08-01
The use of insulin pump and continuous glucose monitoring (CGM) therapies in children and adolescents with type 1 diabetes (T1DM) has increased over the last 10 years, including the group of children <7 years of age. When these young children use pumps and CGM, their families, teachers, school nurses and professional caregivers (who take the place of school nurses in many countries) in preschools, kindergartens and primary schools need to give them special attention since they depend completely on their help in succeeding with diabetes management. Written individualized diabetesrelated health-care plans should be agreed upon between parents, school nurses, professional caregivers and teachers, and the diabetes healthcare team. A structured educational program should be provided for preschools, kindergartens and primary schools that includes information about and practical training for the use of these new diabetes-related technologies.
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2011-12-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deborah L. Layton; Kimberly Frerichs
2010-07-01
The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
2014-03-03
This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less
Laboratory 2000 - The challenge of achieving efficiency and compliance
Potter, John A.
2001-01-01
Significant advances within the field of laboratory automation and instrumentation have greatly benefited the pharmaceutical industry in its quest to discover, develop and monitor the quality of its products. Necessitated by the need for efficiency and greater productivity, faster and more cost-effective means of analyses exist in the form of devices made up of complex electromechanical components, all logically controlled and most with the capability to interface with sophisticated information systems. This benefit does come with a price, a greater responsibility to ensure data quality while complying with increased regulatory requirements. Commitment to this responsibility presents a substantial challenge to scientists and managers throughout the industry. Due diligence must be demonstrated. A comprehensive evaluation of every laboratory system utilized, a solid plan of action for correcting any known deficiencies including upgrades or complete replacement, and an accurate monitoring procedure with the ability to measure progress are all absolute necessities to ensure success. Crossfunctional team effott and communication must transpire with full managerial support. Vendors need to be audited, made aware of any functional or quality inadequacies they possess as well as the pharmaceutical industry's expectation for these shortcomings to be rapidly corrected. Suppliers of these systems should also be encouraged to provide complete ‘off-the-shelf solutions’ to eliminate the need for in-house customization. The requirements for regulatory compliance in today's electronic environment have been well publicized. The players involved are not only listening, but also taking the necessary steps to retain and improve efficiency without sacrificing quality. With the proper measures, planning and action, a highly automated, cost-effective and compliant laboratory operation can become a reality. PMID:18924711
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Rawlins Test 2, UCG/SDB Master Well Drilling and Well Completion Plan consists of two separate reports. Part 1 consists of the Process Well Drilling and Completion Plan (Version D). This program was accomplished during the Fall 1980 drilling campaign. Four of the HFEM wells described in Part 2 were also drilled during that campaign due to early completion of the process well drilling. General program objectives are stated in this report. Part 2 consists of the Instrument Well Drilling and Completion Plan (Version B). This program is presently being accomplished in the Spring 1981 drilling campaign. Due to manymore » changes in the types, numbers and locations of the instrument wells it was written in a more general fashion to retain flexibility in the plan. The only significant changes to date from the plan are that the four HFEM wells completed during Fall 1980 were completed with 92' of Fiberglass at the bottom instead of the 210' now specified.« less
Northwest Forest Plan—the first 10 years (1994–2003): socioeconomic monitoring results.
S. Charnley
2006-01-01
The socioeconomic monitoring report addresses two evaluation questions posed in the Northwest Forest Plan (the Plan) Record of Decision and assesses progress in meeting five Plan socioeconomic goals. Volume I of the report contains key findings. Volume II addresses the question, Are predictable levels of timber and nontimber resources available and being produced? It...
Northern spotted owl effectiveness monitoring plan for the Northwest Forest Plan.
Joseph Lint; Barry Noon; Robert Anthony; Eric Forsman; Martin Raphael; Michael Collopy; Edward. Starkey
1999-01-01
This report describes options for effectiveness monitoring of long-term status and trends of the northern spotted owl to evaluate the success of the Northwest Forest Plan in arresting downward population trends, and in maintaining and restoring the habitat conditions necessary to support viable owl populations on Federal lands. It describes options to address...
Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.
Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin Stapanian
1999-01-01
This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...
40 CFR 63.11468 - What are the monitoring requirements for new and existing sources?
Code of Federal Regulations, 2010 CFR
2010-07-01
... baghouse, including but not limited to air leaks, torn or broken bags or filter media, or any other... identified in the site-specific monitoring plan required by paragraph (c)(2) of this section. (vii) You must... submit to the Administrator or delegated authority for approval a site-specific monitoring plan for each...
The strategy and design of the effectiveness monitoring program for the Northwest Forest Plan.
Barry S. Mulder; Barry R. Noon; Thomas A. Spies; Martin G. Raphael; Craig J. Palmer; Anthony R. Olsen; Gordon H. Reeves; Hartwell H. Welsh
1999-01-01
This report describes the logic and design of an effectiveness monitoring program for the Northwest Forest Plan. The program is prospective, providing an early warning of environmental change before irreversible loss has occurred. Monitoring is focused at two resource levels: individual species and specific ecosystem types. Selection of prospective indicators for the...
DOT National Transportation Integrated Search
2003-07-31
This Stormwater BMP Monitoring Plan details the approach to be used for monitoring : roadside ditch sediment traps located on Highway 26 in the Mt. Hood National Forest. : These sediment traps were designed and installed by ODOT for the capture of se...
DOT National Transportation Integrated Search
1987-03-01
Court monitoring is a planned approach to studying the handling of DWI offenders, from arrest through sentencing, either through actually observing court hearings or by reviewing case outcomes in court files. The booklet is designed to help groups in...
Improving IMRT delivery efficiency using intensity limits during inverse planning.
Coselmon, Martha M; Moran, Jean M; Radawski, Jeffrey D; Fraass, Benedick A
2005-05-01
Inverse planned intensity modulated radiotherapy (IMRT) fields can be highly modulated due to the large number of degrees of freedom involved in the inverse planning process. Additional modulation typically results in a more optimal plan, although the clinical rewards may be small or offset by additional delivery complexity and/or increased dose from transmission and leakage. Increasing modulation decreases delivery efficiency, and may lead to plans that are more sensitive to geometrical uncertainties. The purpose of this work is to assess the use of maximum intensity limits in inverse IMRT planning as a simple way to increase delivery efficiency without significantly affecting plan quality. Nine clinical cases (three each for brain, prostate, and head/neck) were used to evaluate advantages and disadvantages of limiting maximum intensity to increase delivery efficiency. IMRT plans were generated using in-house protocol-based constraints and objectives for the brain and head/neck, and RTOG 9406 dose volume objectives in the prostate. Each case was optimized at a series of maximum intensity ratios (the product of the maximum intensity and the number of beams divided by the prescribed dose to the target volume), and evaluated in terms of clinical metrics, dose-volume histograms, monitor units (MU) required per fraction (SMLC and DMLC delivery), and intensity map variation (a measure of the beam modulation). In each site tested, it was possible to reduce total monitor units by constraining the maximum allowed intensity without compromising the clinical acceptability of the plan. Monitor unit reductions up to 38% were observed for SMLC delivery, while reductions up to 29% were achieved for DMLC delivery. In general, complicated geometries saw a smaller reduction in monitor units for both delivery types, although DMLC delivery required significantly more monitor units in all cases. Constraining the maximum intensity in an inverse IMRT plan is a simple way to improve delivery efficiency without compromising plan objectives.
Chabikuli, Nzapfurundi O; Awi, Dorka D; Chukwujekwu, Ogo; Abubakar, Zubaida; Gwarzo, Usman; Ibrahim, Mohammed; Merrigan, Mike; Hamelmann, Christoph
2009-11-01
To measure changes in service utilization of a model integrating family planning with HIV counselling and testing (HCT), antiretroviral therapy (ART) and prevention of mother-to-child transmission (PMTCT) in the Nigerian public health facilities. It is a retrospective survey of attendance and family planning commodity uptake in 71 health facilities in Nigeria that analyzes the preintegration and postintegration periods between March 2007 and January 2009. A prepost retrospective comparison of mean attendance at family planning clinics and couple-years of protection (CYP) compared 6 months preintegration with 9 months postintegration period. An analysis of service ratios was conducted, relating completed referrals at family planning clinics to service utilization at the referring HIV clinics. Mean attendance at family planning clinics increased significantly from 67.6 in preintegration to 87.0 in postintegration. The mean CYP increased significantly from 32.3 preintegration to 38.2 postintegration. Service ratio of referrals from each of the HIV clinics was low but increased in the postintegration period by 4, 34 and 42 per 1000 clients from HCT, ART and PMTCT clinics, respectively. Service ratios were higher in primary healthcare settings than in secondary or tertiary hospitals. Attendance by men at family planning clinics was significantly higher among clients referred from HIV clinics. Family planning-HIV integration using the referral model improved family planning service utilization by clients accessing HIV services, but further improvement is possible. Male utilization of family planning services also improved. The government of Nigeria should review the family planning user fee policy and scale up the integration in primary healthcare facilities.
Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-03-01
This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; andmore » analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are notmore » merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-11-06
In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less
ALOS-2 current status and operation plan
NASA Astrophysics Data System (ADS)
Suzuki, Shinichi; Kankaku, Yukihiro; Osawa, Yuji
2013-10-01
The Advanced Land Observing Satellite-2 (ALOS-2) carries the state-of-the-art L-band Synthetic Aperture Radar (SAR) called PALSAR-2 which succeeds to the ALOS / PALSAR. PALSAR-2 will have enhanced performance in both high resolution and wide swath compared to PALSAR. It will allow comprehensive monitoring of disasters. Wider bandwidth and shorter revisit time will give better conference for INSAR data analysis such as crustal deformation and deforestation. The Proto Flight Test (PFT) of ALOS-2 has been conducted since June 2012. In parallel, the PFT of PALSAR-2 has been conducted since March 2012. As of August 2013, ALOS-2 system has completed the interface test with ground system and is preparing for the Vibration test, Acoustic test and Electromagnetic Compatibility test. After completing these tests, ALOS-2 will be transported to JAXA Tanegashima Space Center for launch. The initial commissioning phase of ALOS-2 is planned for six months which are comprised of LEOP (Launch and Early Orbit Phase) and initial Cal/Val phase. During the LEOP, all components will be checked with direct downlink via Xband and with data relay communication via JAXA's DRTS (Data Relay Test Satellite). During the initial Cal/Val phase, the PALSAR-2 data will be verified and calibrated by using Corner Reflectors and Geometric Calibrator at ground. The data acquisition during the commissioning phase will be consistent with the systematic acquisition strategy prepared for the routine operation. This paper describes the current status and operation plan of ALOS-2.
Wildlife monitoring program plan
NASA Technical Reports Server (NTRS)
Sebesta, P.; Arno, R.
1979-01-01
A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.
Success of the Melton Valley Watershed Remediation at the ORNL - 12351
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adler, David; Wilkerson, Laura; Sims, Lynn
2012-07-01
The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Actionmore » Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)« less
Gallio, Elena; Giglioli, Francesca Romana; Girardi, Andrea; Guarneri, Alessia; Ricardi, Umberto; Ropolo, Roberto; Ragona, Riccardo; Fiandra, Christian
2018-02-01
Automated treatment planning is a new frontier in radiotherapy. The Auto-Planning module of the Pinnacle 3 treatment planning system (TPS) was evaluated for liver stereotactic body radiation therapy treatments. Ten cases were included in the study. Six plans were generated for each case by four medical physics experts. The first two planned with Pinnacle TPS, both with manual module (MP) and Auto-Planning one (AP). The other two physicists generated two plans with Monaco TPS (VM). Treatment plan comparisons were then carried on the various dosimetric parameters of target and organs at risk, monitor units, number of segments, plan complexity metrics and human resource planning time. The user dependency of Auto-Planning was also tested and the plans were evaluated by a trained physician. Statistically significant differences (Anova test) were observed for spinal cord doses, plan average beam irregularity, number of segments, monitor units and human planning time. The Fisher-Hayter test applied to these parameters showed significant statistical differences between AP e MP for spinal cord doses and human planning time; between MP and VM for monitor units, number of segments and plan irregularity; for all those between AP and VM. The two plans created by different planners with AP were similar to each other. The plans created with Auto-Planning were comparable to the manually generated plans. The time saved in planning enables the planner to commit more resources to more complex cases. The independence of the planner enables to standardize plan quality. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Garriga, Ricard Giné; de Palencia, Alejandro Jiménez Fdez; Foguet, Agustí Pérez
2015-09-01
Today, a vast proportion of people still lack a simple pit latrine and a source of safe drinking water. To help end this appalling state of affairs, there is a pressing need to provide policymakers with evidences which may be the basis of effective planning, targeting and prioritization. Two major challenges often hinder this process: i) lack of reliable data to identify which areas are most in need; and ii) inadequate instruments for decision-making support. In tackling previous shortcomings, this paper proposes a monitoring framework to compile, analyze, interpret and disseminate water, sanitation and hygiene information. In an era of decentralization, where decision-making moves to local governments, we apply such framework at the local level. The ultimate goal is to develop appropriate tools for decentralized planning support. To this end, the study first implements a methodology for primary data collection, which combines the household and the waterpoint as information sources. In doing so, we provide a complete picture of the context in which domestic WASH services are delivered. Second, the collected data are analyzed to underline the emerging development challenges. The use of simple planning indicators serves as the basis to i) reveal which areas require policy attention, and to ii) identify the neediest. Third, a classification process is proposed to prioritize among various populations. Three different case studies from East and Southern African countries are presented. Results indicate that accurate and comprehensive data, if adequately exploited through simple instruments, may be the basis of effective targeting and prioritization, which are central to sector planning. The application of the proposed framework in the real world, however, is to a certain extent elusive; and we point out to conclude two specific challenges that remain unaddressed, namely the upgrade of existing decision-making processes to enhance transparency and inclusiveness, and the development of data updating mechanisms. Copyright © 2015 Elsevier B.V. All rights reserved.
Physicians' Perspectives on the Diagnosis and Treatment of Chronic Nonbacterial Osteomyelitis
Dedeoglu, Fatma; Lapidus, Sivia K.; Laxer, Ronald M.; Bradford, Miranda C.; Li, Suzanne C.
2017-01-01
Background/Purpose. Understanding the practices of pediatric rheumatologists in diagnosing and treating chronic nonbacterial osteomyelitis (CNO) can provide important information to guide the development of consensus treatment plans. The objectives of this study were to determine physicians' approaches to (1) diagnosing and monitoring CNO, (2) ordering a bone biopsy, and (3) making treatment decisions. Methods. A survey was distributed among members of the Childhood Arthritis and Rheumatology Research Alliance using a web-based questionnaire. Results. 121 of 277 (41%) attending physician members completed the survey. Plain radiographs (89%) were most commonly used followed by regional MRI (78%), bone scintigraphy (43%), and whole-body MRI (36%). The top three reasons for performing a biopsy were constitutional findings (66%), unifocal bone lesions (64%), and nocturnal bone pain (45%). Nearly all responders (95%) prescribed nonsteroidal anti-inflammatory drugs (NSAIDs) as initial therapy. For patients who failed NSAID treatment, methotrexate (67%), tumor necrosis factor inhibitors (65%), and bisphosphonates (46%) were the next most commonly used treatments. The presence of a spinal lesion increased the use of bisphosphonate treatment. Conclusion. The diagnostic approach and disease activity monitoring for CNO varied among surveyed physicians. Our survey findings provided important background for the development of consensus treatment plans for CNO. PMID:28167963
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daley, Thomas M.; Vasco, Don; Ajo-Franklin, Jonathan
After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storagemore » (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.« less
BIO-Plex Information System Concept
NASA Technical Reports Server (NTRS)
Jones, Harry; Boulanger, Richard; Arnold, James O. (Technical Monitor)
1999-01-01
This paper describes a suggested design for an integrated information system for the proposed BIO-Plex (Bioregenerative Planetary Life Support Systems Test Complex) at Johnson Space Center (JSC), including distributed control systems, central control, networks, database servers, personal computers and workstations, applications software, and external communications. The system will have an open commercial computing and networking, architecture. The network will provide automatic real-time transfer of information to database server computers which perform data collection and validation. This information system will support integrated, data sharing applications for everything, from system alarms to management summaries. Most existing complex process control systems have information gaps between the different real time subsystems, between these subsystems and central controller, between the central controller and system level planning and analysis application software, and between the system level applications and management overview reporting. An integrated information system is vitally necessary as the basis for the integration of planning, scheduling, modeling, monitoring, and control, which will allow improved monitoring and control based on timely, accurate and complete data. Data describing the system configuration and the real time processes can be collected, checked and reconciled, analyzed and stored in database servers that can be accessed by all applications. The required technology is available. The only opportunity to design a distributed, nonredundant, integrated system is before it is built. Retrofit is extremely difficult and costly.
Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Urban, Mary Elizabeth
Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less
The New WindForS Wind Energy Test Site in Southern Germany
NASA Astrophysics Data System (ADS)
Clifton, A. J.
2017-12-01
Wind turbines are increasingly being installed in complex terrain where patchy landcover, forestry, steep slopes, and complex regional and local atmospheric conditions lead to major challenges for traditional numerical weather prediction methods. In this presentation, the new WindForS complex terrain test site will be introduced. WindForS is a southern Germany-based research consortium of more than 20 groups at higher education and research institutes, with strong links to regional government and industry. The new test site will be located in the hilly, forested terrain of the Swabian Alps between Stuttgart and Germany, and will consist of two wind turbines with four meteorological towers. The test site will be used for accompanying ecological research and will also have mobile eddy covariance measurement stations as well as bird and bat monitoring systems. Seismic and noise monitoring systems are also planned. The large number of auxiliary measurements at this facility are intended to allow the complete atmosphere-wind turbine-environment-people system to be characterized. This presentation will show some of the numerical weather prediction work and measurements done at the site so far, and inform the audience about WindForS' plans for the future. A major focus of the presentation will be on opportunities for collaboration through field campaigns or model validation.
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed...
NASA Astrophysics Data System (ADS)
Cheong, Kwang-Ho; Lee, Me-Yeon; Kang, Sei-Kwon; Yoon, Jai-Woong; Park, Soah; Hwang, Taejin; Kim, Haeyoung; Kim, Kyoung Ju; Han, Tae Jin; Bae, Hoonsik
2015-07-01
The aim of this study is to set up statistical quality control for monitoring the volumetric modulated arc therapy (VMAT) delivery error by using the machine's log data. Eclipse and a Clinac iX linac with the RapidArc system (Varian Medical Systems, Palo Alto, USA) are used for delivery of the VMAT plan. During the delivery of the RapidArc fields, the machine determines the delivered monitor units (MUs) and the gantry angle's position accuracy and the standard deviations of the MU ( σMU: dosimetric error) and the gantry angle ( σGA: geometric error) are displayed on the console monitor after completion of the RapidArc delivery. In the present study, first, the log data were analyzed to confirm its validity and usability; then, statistical process control (SPC) was applied to monitor the σMU and the σGA in a timely manner for all RapidArc fields: a total of 195 arc fields for 99 patients. The MU and the GA were determined twice for all fields, that is, first during the patient-specific plan QA and then again during the first treatment. The sMU and the σGA time series were quite stable irrespective of the treatment site; however, the sGA strongly depended on the gantry's rotation speed. The σGA of the RapidArc delivery for stereotactic body radiation therapy (SBRT) was smaller than that for the typical VMAT. Therefore, SPC was applied for SBRT cases and general cases respectively. Moreover, the accuracy of the potential meter of the gantry rotation is important because the σGA can change dramatically due to its condition. By applying SPC to the σMU and σGA, we could monitor the delivery error efficiently. However, the upper and the lower limits of SPC need to be determined carefully with full knowledge of the machine and log data.
Monitoring quality in Israeli primary care: The primary care physicians' perspective
2012-01-01
Background Since 2000, Israel has had a national program for ongoing monitoring of the quality of the primary care services provided by the country's four competing non-profit health plans. Previous research has demonstrated that quality of care has improved substantially since the program's inception and that the program enjoys wide support among health plan managers. However, prior to this study there were anecdotal and journalistic reports of opposition to the program among primary care physicians engaged in direct service delivery; these raised serious questions about the extent of support among physicians nationally. Goals To assess how Israeli primary care physicians experience and rate health plan efforts to track and improve the quality of care. Method The study population consisted of primary care physicians employed by the health plans who have responsibility for the quality of care of a panel of adult patients. The study team randomly sampled 250 primary-care physicians from each of the four health plans. Of the 1,000 physicians sampled, 884 met the study criteria. Every physician could choose whether to participate in the survey by mail, e-mail, or telephone. The anonymous questionnaire was completed by 605 physicians – 69% of those eligible. The data were weighted to reflect differences in sampling and response rates across health plans. Main findings The vast majority of respondents (87%) felt that the monitoring of quality was important and two-thirds (66%) felt that the feedback and subsequent remedial interventions improved medical care to a great extent. Almost three-quarters (71%) supported continuation of the program in an unqualified manner. The physicians with the most positive attitudes to the program were over age 44, independent contract physicians, and either board-certified in internal medicine or without any board-certification (i.e., residents or general practitioners). At the same time, support for the program was widespread even among physicians who are young, board-certified in family medicine, and salaried. Many physicians also reported that various problems had emerged to a great or very great extent: a heavier workload (65%), over-competitiveness (60%), excessive managerial pressure (48%), and distraction from other clinical issues (35%). In addition, there was some criticism of the quality of the measures themselves. Respondents also identified approaches to addressing these problems. Conclusions The findings provide perspective on the anecdotal reports of physician opposition to the monitoring program; they may well accurately reflect the views of the small number of physicians directly involved, but they do not reflect the views of primary care physicians as a whole, who are generally quite supportive of the program. At the same time, the study confirms the existence of several perceived problems. Some of these problems, such as excess managerial pressure, can probably best be addressed by the health plans themselves; while others, such as the need to refine the quality indicators, are probably best addressed at the national level. Cooperation between primary care physicians and health plan managers, which has been an essential component of the program's success thus far, can also play an important role in addressing the problems identified. PMID:22913311
Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor
2014-01-01
Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication.
Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor
2014-01-01
Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication. PMID:25249999
Planning for execution monitoring on a planetary rover
NASA Technical Reports Server (NTRS)
Gat, Erann; Firby, R. James; Miller, David P.
1990-01-01
A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
..., 72, et al. Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 and Amendments to Material Control and Accounting Regulations; Proposed Rules #0;#0... Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 AGENCY...
A representation for error detection and recovery in robot task plans
NASA Technical Reports Server (NTRS)
Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.
1990-01-01
A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.
Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2005-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2008-12-22
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2006-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2009-08-06
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Quantum Gravity Gradiometer Development for Space
NASA Technical Reports Server (NTRS)
Kohel, James M.; Yu, Nan; Kellogg, James R.; Thompson, Robert J.; Aveline, David C.; Maleki, Lute
2006-01-01
Funded by the Advanced Technology Component Program, we have completed the development of a laboratory-based quantum gravity gradiometer based on atom interferometer technology. This is our first step towards a new spaceborne gradiometer instrument, which can significantly contribute to global gravity mapping and monitoring important in the understanding of the solid earth, ice and oceans, and dynamic processes. In this paper, we will briefly review the principles and technical benefits of atom-wave interferometer-based inertial sensors in space. We will then describe the technical implementation of the laboratory setup and report its status. We will also discuss our implementation plan for the next generation instrument.
Berger-Fiffy, Jill
2012-01-01
Harvard Vanguard Medical Associates (Harvard Vanguard) decided to develop a Shared Medical Appointment (SMA) program in 2007 for a variety of reasons. The program has launched 86 SMAs in 17 specialties at 12 sites and has exceeded 13 000 patient visits. Currently, the practice offers 54 SMAs and is believed to be the largest program in the country. This article provides an overview regarding staffing, space and equipment, project planning, promotional materials, training programs, workflow development, and the use of quality improvement (ie, LEAN) tools used to monitor the work to be completed and the metrics to date.
Training in Innovative Technologies for Close-Range Sensing in Alpine Terrain
NASA Astrophysics Data System (ADS)
Rutzinger, M.; Bremer, M.; Höfle, B.; Hämmerle, M.; Lindenbergh, R.; Oude Elberink, S.; Pirotti, F.; Scaioni, M.; Wujanz, D.; Zieher, T.
2018-05-01
The 2nd international summer school "Close-range sensing techniques in Alpine terrain" was held in July 2017 in Obergurgl, Austria. Participants were trained in selected close-range sensing methods, such as photogrammetry, laser scanning and thermography. The program included keynotes, lectures and hands-on assignments combining field project planning, data acquisition, processing, quality assessment and interpretation. Close-range sensing was applied for different research questions of environmental monitoring in high mountain environments, such as geomorphologic process quantification, natural hazard management and vegetation mapping. The participants completed an online questionnaire evaluating the summer school, its content and organisation, which helps to improve future summer schools.
Shuttle on-orbit contamination and environmental effects
NASA Technical Reports Server (NTRS)
Leger, L. J.; Jacobs, S.; Ehlers, H. K. F.; Miller, E.
1985-01-01
Ensuring the compatibility of the space shuttle system with payloads and payload measurements is discussed. An extensive set of quantitative requirements and goals was developed and implemented by the space shuttle program management. The performance of the Shuttle system as measured by these requirements and goals was assessed partly through the use of the induced environment contamination monitor on Shuttle flights 2, 3, and 4. Contamination levels are low and generally within the requirements and goals established. Additional data from near-term payloads and already planned contamination measurements will complete the environment definition and allow for the development of contamination avoidance procedures as necessary for any payload.
Yvonne Everett
2008-01-01
In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
A microclimate study on hypogea environments of ancient roman building.
Scatigno, C; Gaudenzi, S; Sammartino, M P; Visco, G
2016-10-01
Roman hypogea, vernacular settlements or crypts, are underground places characterised by specific and unique challenges (RH<90% and almost constant temperature throughout the whole year) related to their relative isolation from the outdoor environment. These sites often require adequate monitoring tools providing complete environmental information in order to carry out appropriate strategies for scheduling routine maintenance and designing suitable layouts for their preservation. In this work we present the results of a carefully planned thermo-hygrometric monitoring campaign conducted in a peculiar Roman building (130CE), the "Casa di Diana" Mithraeum, sited in Ostia Antica (archaeological site, Rome-Italy), with the aim of characterising the indoor environment as the structure suffers of several conservation problems (biocolonisation, efflorescences, evaporating and condensing cycle for wall-building materials). The campaign involving multipoint continuous measurement was carefully planned to better describe this micro-clime. In addition to underground environmental data available in literature, we have also performed, as a checkpoint control, a thermo-hygrometric monitoring campaign in the "Terme di Mitra" Hypogeum, a few meters from the "Casa di Diana". The recorded data was analysed by multivariate statistical and chemometric analyses. The results brought to light the presence of different microclimates (three areas) within a single Mithraeum: a room (pre-Mithraeum) and an area (Mithraeum: 2-4m) present a thermo-hygrometric environmental behaviour in accordance with a semi-confined environment, another area (Mithraeum: 1-2m) behaves accordingly with underground environments (although it cannot be described as such), and the last area (Mithraeum: 0-1m) where was recording RH values close to saturation (96-99%), associated with non-ventilated areas where the rising damp is "held" and not dispersed, describing an own micro-clime, comparable to a "small greenhouse". This study has allowed to identify some critical areas in view of planning future conservation solutions, without exporting the artefacts kept inside. Copyright © 2016 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Spaans, Karsten; Hatton, Emma; Gonzalez, Pablo; Walters, Richard; McDougall, Alistair; Wright, Tim; Hooper, Andy
2017-04-01
The advantages of the Sentinel-1 constellation for InSAR applications over previous radar missions are numerous, and include small baselines, a planned operation time of 20 years, continuous and systematic acquisition of data over tectonic and volcanic areas, near-global coverage of the earth and free data availability. In order to take advantage of these properties, we at the Centre for the Observation and Modelling of Earthquakes, Volcanoes, and Tectonics (COMET) are developing a system that routinely processes and freely distributes interferometric products and time series over tectonic and volcanic regions. This project, and similar efforts at other institutions, will be a game changer for the monitoring and studying of tectonic and volcanic activity using InSAR. Since December 2016, the COMET-LiCS InSAR portal (http://comet.nerc.ac.uk/COMET-LiCS-portal/) has been live, delivering interferograms and coherence estimates over the entire Alpine-Himalayan belt. The portal already contains tens of thousands of products, which can be browsed in a user-friendly portal, and downloaded for free by the general public. For our processing, we use the Climate and Environmental Monitoring from Space (CEMS) facility, where we have large storage and processing facilities to our disposal and a complete duplicate of the Sentinel-1 archive is maintained. This greatly simplifies the infrastructure we have had to develop for automated processing of large areas. Here we will give an overview of the current status of the processing system, as well as discuss future plans. We will cover the infrastructure we developed to automatically produce interferograms and its challenges, and the processing strategy for time series analysis. We will outline the objectives of the system in the near and distant future, and a roadmap for its continued development. Finally, we will highlight some of the scientific results and projects linked to the system.
NASA Technical Reports Server (NTRS)
1975-01-01
The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
Cornhusker Army Ammunition Plant Longterm Groundwater Monitoring Health and Safety Plan
1997-06-01
Enclosed please find fifteen copies of the final Health and Safety Plan for the long term ground water monitoring at the Cornhusker Army Ammunitions...Plant. Enclosed within the plan is a letter dated June 6, 1997 containing responses to the comments received from William Houser. The responses to Mr. Houser’s comments have also been incorporated into the document as appropriate.
Northwest Forest Plan—the first 10 years (1994-2003): synthesis of monitoring and research results.
Richard W. Haynes; Bernard T. Bormann; Danny C. Lee; Jon R. Martin
2006-01-01
It has been 10 years since the Northwest Forest Plan (the Plan) came into being at the direction of President Clinton. This report synthesizes the status and trends of five major elements of the Plan: older forests, species, aquatic systems, socioeconomics, and adaptive management and monitoring. It synthesizes new science that has resulted from a decade of research....
Five-Year Technology Plan. Educational Planning Center.
ERIC Educational Resources Information Center
Virginia Beach City Public Schools, VA.
This 5-year plan is based on "A Comprehensive Plan for Instructional and Administrative Use of Computers in the Virginia Beach Public Schools" ("The Pogrow Report," completed in December 1984) and the "Task Force Report on Information Systems" (completed in July 1988). These reports document the importance of making…
Prioritizing strategies for comprehensive liver cancer control in Asia: a conjoint analysis.
Bridges, John F P; Dong, Liming; Gallego, Gisselle; Blauvelt, Barri M; Joy, Susan M; Pawlik, Timothy M
2012-10-30
Liver cancer is a complex and burdensome disease, with Asia accounting for 75% of known cases. Comprehensive cancer control requires the use of multiple strategies, but various stakeholders may have different views as to which strategies should have the highest priority. This study identified priorities across multiple strategies for comprehensive liver cancer control (CLCC) from the perspective of liver cancer clinical, policy, and advocacy stakeholders in China, Japan, South Korea and Taiwan. Concordance of priorities was assessed across the region and across respondent roles. Priorities for CLCC were examined as part of a cross-sectional survey of liver cancer experts. Respondents completed several conjoint-analysis choice tasks to prioritize 11 strategies. In each task, respondents judged which of two competing CLCC plans, consisting of mutually exclusive and exhaustive subsets of the strategies, would have the greatest impact. The dependent variable was the chosen plan, which was then regressed on the strategies of different plans. The restricted least squares (RLS) method was utilized to compare aggregate and stratified models, and t-tests and Wald tests were used to test for significance and concordance, respectively. Eighty respondents (69.6%) were eligible and completed the survey. Their primary interests were hepatitis (26%), hepatocellular carcinoma (HCC) (58%), metastatic liver cancer (10%) and transplantation (6%). The most preferred strategies were monitoring at-risk populations (p<0.001), clinician education (p<0.001), and national guidelines (p<0.001). Most priorities were concordant across sites except for three strategies: transplantation infrastructure (p=0.009) was valued lower in China, measuring social burden (p=0.037) was valued higher in Taiwan, and national guidelines (p=0.025) was valued higher in China. Priorities did not differ across stakeholder groups (p=0.438). Priorities for CLCC in Asia include monitoring at-risk populations, clinician education, national guidelines, multidisciplinary management, public awareness and centers of excellence. As most priorities are relatively concordant across the region, multilateral approaches to addressing comprehensive liver cancer would be beneficial. However, where priorities are discordant among sites, such as transplantation infrastructure, strategies should be tailored to local needs.
Sean P. Gallagher; David W. Wright
2012-01-01
California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...
ISS Utilization for Exploration-Class Missions
NASA Technical Reports Server (NTRS)
FIncke, R.; Davis-Street, J.; Korth, D.
2006-01-01
Exercise countermeasures are the most commonly utilized approach for maintaining the health and performance of astronauts during spaceflight missions. However, International Space Station (ISS) exercise countermeasure hardware reliability and prescriptions are not at a point of departure to support exploration-class missions. The JSC Exercise Countermeasures Project (ECP) plans to use ISS as a research and hardware evaluation platform to define and validate improved exercise hardware, prescriptions, and monitoring strategies to support crewmember operations on the Moon and Mars. The ECP will partner with JSC's Space Medicine Division to standardize elements of ISS exercise prescriptions to better understand their efficacy and to propose modified prescriptions for implementation that may be used in the crew exploration vehicle and/or lunar habitat. In addition, evaluations of the ISS treadmill harness will be conducted to define and improve fit and function, and assess the next generation medical monitoring devices such as the portable unit for metabolic analysis and the muscle atrophy research and exercise system for completion of periodic fitness evaluations during lunar and Mars travel. Finally, biomechanical data from ISS crew exercise sessions will be obtained to better understand loading and restraint systems, and identify the physiologic requirements during ISS extravehicular activities that may be analogous to extended excursions from the lunar habitat. It is essential to optimize exercise prescriptions, hardware, and monitoring strategies for exploration initiatives using ISS as a platform before the planned retirement of the Shuttle in 2010 and the declining NASA emphasis on ISS to maximize knowledge before embarking on travel to the Moon and Mars.
Recommendations for new monitoring wells at Everest, Kansas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
2007-05-03
On February 15, 2007, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) submitted Recommendations for Remedial Action at Everest, Kansas. Those Recommendations were accepted by the Kansas Department of Health and Environment (KDHE) in a letter to the CCC/USDA dated March 5, 2007. The approved Recommendations document outlines a plan for systematic groundwater sampling and monitoring at Everest to provide data necessary for the critical evaluation of remedial options - including a phytoremediation alternative - for restoration of the groundwater and protection of the surface waters of the intermittent creek at this site. Phase I of themore » KDHE-approved monitoring plan includes the following activities: (1) Groundwater sampling at existing monitoring wells, with analyses for volatile organic compounds (VOCs) and selected biodegradation parameters; (2) Sampling of surface waters along the intermittent creek for VOCs analyses; and (3) Periodic manual measurement and automated recording of groundwater and surface water levels in the vicinity of the intermittent creek. The locations selected for groundwater and surface water sampling and analyses under the approved monitoring program were determined in consultation with the KDHE. As a result of subsequent discussions among representatives of the KDHE, the CCC/USDA, and Argonne regarding the technical program at Everest, the CCC/USDA seeks KDHE approval for the installation of up to four new permanent monitoring wells along the upper reach of the intermittent creek west of the Nigh property, as shown in Figure 1. The proposed new well locations lie progressively downgradient in the anticipated direction of future groundwater and contaminant movement; all of the recommended points lie at least 2,000 ft upgradient, however, of the confirmed area of groundwater discharge to the creek identified near Highway 73. The proposed new wells will supplement the existing network of groundwater and surface water monitoring points identified in the KDHE-approved monitoring plan. The new wells will be sampled in accord with the schedules outlined in the approved plan. The new wells are recommended to address specific investigation needs, as follows: (1) The proposed borings will provide data on the lithologic and hydrogeologic characteristics - and the relative continuity - of the Everest aquifer unit along the upgradient reach of the intermittent creek, where possible implementation of a phytoremediation remedy is under consideration. (2) Installation of the borings will permit the collection of sediments from the aquifer unit for possible physical or hydraulic property analyses. The completed monitoring wells will also facilitate possible future in situ estimation of the aquifer unit's hydraulic properties in this area, as part of the remedy evaluation and development process. (3) The completed new wells will be used to determine the depths to groundwater and the pattern(s) of groundwater flow near the intermittent creek, and hence to predict more accurately the locations of possible groundwater (and contaminant) discharge and the extent of the area amenable to possible phytoremediation. (4) The use of automated groundwater level recorders at the new locations will provide data on the potential range and variability of groundwater levels to be expected in the area near the intermittent creek. (5) Periodic sampling of the recommended wells for VOCs analyses will help to constrain (1) the rate(s) and pathway(s) of contaminant approach toward the intermittent creek (and the area amenable to possible phytoremediation) and (2) the areal extent of the plume as it continues to evolve. The resulting 'early warning' data obtained from this sampling will therefore help to ensure that remedial action can be taken, if necessary, in sufficient time to prevent unacceptable levels of carbon tetrachloride contamination from threatening the identified surface waters of the creek. The well locations shown in Figure 1 were chosen to satisfy the technical objectives above, as well as to minimize disruption (to the extent possible) of the normal agricultural activities in the required investigation area. To accommodate these somewhat conflicting goals, the recommended monitoring points include one new well (PZ1) along the existing waterways west of the Nigh property, one new well (PZ3) along the margin of the farm field southwest of existing well SB63 and northeast of well SB64, and two new wells (PZ2, PZ4) in the fields east of the intermittent creek. The CCC/USDA has contacted the potentially affected landowner and is attempting to negotiate access to the desired well locations. If the necessary access cannot be obtained, a modified distribution of three new monitoring wells, to be located entirely along the existing waterways west and southwest of the Nigh property, is proposed as a possible alternate configuration.« less
The technology management process at the European space agency
NASA Astrophysics Data System (ADS)
Guglielmi, M.; Williams, E.; Groepper, P.; Lascar, S.
2010-03-01
Technology is developed at the European Space Agency (ESA) under several programmes: corporate and domain specific, mandatory and optional, with different time horizons and covering different levels of the TRL scale. To improve the transparency and efficiency of the complete process, it was felt necessary to establish an agreed end to end process for the management of all technology R&D activity that could: Include all ESA programmes and consider the requirements of European users Lead to coordinated multi-year work plan and yearly procurement plans Prepare and enable future European space programmes Be harmonized with national initiatives in Europe Thereby establishing the basis for a product policy to reduce risks to technology users, reduce costs and delays, and enhance industrial competitiveness and non-dependence. In response to the above needs, ESA has developed a technology management process called the ESA End-to-End process (E2E), from establishment of the strategy to the monitoring and evaluation of R&D results. In this paper, the complete process will be described in detail including a discussion on its strengths and limitations, and its links to the wider European Harmonization process. The paper will be concluded with the introduction of the ESA Technology Tree: a basic tool to structure and facilitate communication about technology issues.
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must my waste management plan be... Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-08-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell is nearly complete with only the biofilter remaining and is scheduled to be complete by the end of August 2003. The current project status and preliminary monitoring results are summarized in this report.« less
NASA Astrophysics Data System (ADS)
Burnison, S. A.; Ditty, P.; Gorecki, C. D.; Hamling, J. A.; Steadman, E. N.; Harju, J. A.
2013-12-01
The Plains CO2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center, is working with Denbury Onshore LLC to determine the effect of a large-scale injection of carbon dioxide (CO2) into a deep clastic reservoir for the purpose of simultaneous CO2 enhanced oil recovery (EOR) and to study incidental CO2 storage at the Bell Creek oil field located in southeastern Montana. This project will reduce CO2 emissions by more than 1 million tons a year while simultaneously recovering an anticipated 30 million barrels of incremental oil. The Bell Creek project provides a unique opportunity to use and evaluate a comprehensive suite of technologies for monitoring, verification, and accounting (MVA) of CO2 on a large-scale. The plan incorporates multiple geophysical technologies in the presence of complementary and sometimes overlapping data to create a comprehensive data set that will facilitate evaluation and comparison. The MVA plan has been divided into shallow and deep subsurface monitoring. The deep subsurface monitoring plan includes 4-D surface seismic, time-lapse 3-D vertical seismic profile (VSP) surveys incorporating a permanent borehole array, and baseline and subsequent carbon-oxygen logging and other well-based measurements. The goal is to track the movement of CO2 in the reservoir, evaluate the recovery/storage efficiency of the CO2 EOR program, identify fluid migration pathways, and determine the ultimate fate of injected CO2. CO2 injection at Bell Creek began in late May 2013. Prior to injection, a monitoring and characterization well near the field center was drilled and outfitted with a distributed temperature-monitoring system and three down-hole pressure gauges to provide continuous real-time data of the reservoir and overlying strata. The monitoring well allows on-demand access for time-lapse well-based measurements and borehole seismic instrumentation. A 50-level permanent borehole array of 3-component geophones was installed in a second monitoring well. A pre-injection series of carbon-oxygen logging across the reservoir was acquired in 35 wells. The baseline 3-D surface seismic survey was acquired in September 2012. A 3-D VSP incorporating two wells and 2 square miles of overlapping seismic coverage in the middle of the field was acquired in May 2013. Initial iterations of geologic modeling and reservoir simulation of the field have been completed. Currently, passive seismic monitoring with the permanent borehole array is being conducted during injection. Interpretation results from the baseline surface 3-D survey and preliminary results from the baseline 3-D VSP are being evaluated and integrated into the reservoir model. The PCOR Partnership's philosophy is to combine site characterization, modeling, and monitoring strategies into an iterative process to produce descriptive integrated results. The comprehensive effort at Bell Creek will allow a comparison of the effectiveness of several complementary geophysical and well-based methods in meeting the goals of the deep subsurface monitoring effort.
Kirby, Mark F; Law, Robin J
2010-06-01
A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.; Environmental Science Division
This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.« less
Curating NASA's Astromaterials Collections: Past, Present, and Future
NASA Technical Reports Server (NTRS)
Zeigler, Ryan
2015-01-01
Planning for the curation of samples from future sample return missions must begin during the initial planning stages of a mission. Waiting until the samples have been returned to Earth, or even when you begin to physically build the spacecraft is too late. A lack of proper planning could lead to irreversible contamination of the samples, which in turn would compromise the scientific integrity of the mission. For example, even though the Apollo missions first returned samples in 1969, planning for the curation facility began in the early 1960s, and construction of the Lunar Receiving Laboratory was completed in 1967. In addition to designing the receiving facility and laboratory that the samples will be characterized and stored in, there are many aspects of contamination that must be addressed during the planning and building of the spacecraft: planetary protection (both outbound and inbound); cataloging, documenting, and preserving the materials used to build spacecraft (also known as coupons); near real-time monitoring of the environment in which the spacecraft is being built using witness plates for critical aspects of contamination (known as contamination control); and long term monitoring and preservation of the environment in which the spacecraft is being built for most aspects of potential contamination through the use of witness plates (known as contamination knowledge). The OSIRIS REx asteroid sample return mission, currently being built, is dealing with all of these aspects of contamination in order to ensure they return the best preserved sample possible. Coupons and witness plates from OSIRIS REx are currently being studied and stored (for future studies) at the Johnson Space Center. Similarly, planning for the clean room facility at Johnson Space Center to house the OSIRIS-REx samples is well advanced, and construction of the facility should begin in early 2017 (despite a nominal 2023 return date for OSIRIS-REx samples). Similar development is being done, in concert with JAXA, for the return of Hayabusa 2 samples (nominally in 2020). We are also actively developing advanced techniques like cold curation and organically clean curation in anticipation of future sample return missions such as comet nucleus sample return and Mars sample return.
Central Alaska Network vital signs monitoring plan
MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug
2005-01-01
Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.
Application of constraint-based satellite mission planning model in forest fire monitoring
NASA Astrophysics Data System (ADS)
Guo, Bingjun; Wang, Hongfei; Wu, Peng
2017-10-01
In this paper, a constraint-based satellite mission planning model is established based on the thought of constraint satisfaction. It includes target, request, observation, satellite, payload and other elements, with constraints linked up. The optimization goal of the model is to make full use of time and resources, and improve the efficiency of target observation. Greedy algorithm is used in the model solving to make observation plan and data transmission plan. Two simulation experiments are designed and carried out, which are routine monitoring of global forest fire and emergency monitoring of forest fires in Australia. The simulation results proved that the model and algorithm perform well. And the model is of good emergency response capability. Efficient and reasonable plan can be worked out to meet users' needs under complex cases of multiple payloads, multiple targets and variable priorities with this model.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun
Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less
Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q
2015-01-01
An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... involvement of the responsible parties in the assessment; and (vii) A description of monitoring for.... (3) The monitoring component to the Draft Restoration Plan should address such factors as duration...
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
40 CFR 141.622 - Subpart V monitoring plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...
A tentative discussion on the monitoring of water resources in China
NASA Astrophysics Data System (ADS)
Yang, Jianqing; Dai, Ning; Wu, Mengying; Wang, Guangsheng
2016-10-01
With the rapid economy development and social civilization progress, the Chinese Government also is improving ecological environmental conditions. More efforts have been made to solve water problems through the implementation of stringent water resources management, as a key government policy on water. Thus, monitoring of water resources has been strengthened, being a main component of the hydrological work in recent years. Compared with routine hydrological monitoring, water resources monitoring pays more attention to the quantity and quality variations of regional waters, to reflect the status of water in river basins and administrative regions. In this paper, the overall layout of the hydrometric network in China is presented, monitoring efforts of the natural water cycle and water consumptions are analyzed, methodologies of water resources monitoring, which are commonly applied in the country, are summed up. Taking the hydrometric network planning on interprovincial boundary waterbodies as example, a summary of the planning at interprovincial boundary river sections is presented. The planning can meet the need of water resources management of administrative divisions. It can also improve the overall water resources monitoring for the country.
A National Residue Control Plan from the analytical perspective--the Brazilian case.
Mauricio, Angelo de Q; Lins, Erick S; Alvarenga, Marcelo B
2009-04-01
Food safety is a strategic topic entailing not only national public health aspects but also competitiveness in international trade. An important component of any food safety program is the control and monitoring of residues posed by certain substances involved in food production. In turn, a National Residue Control Plan (NRCP) relies on an appropriate laboratory network, not only to generate analytical results, but also more broadly to verify and co-validate the controls built along the food production chain. Therefore laboratories operating under a NRCP should work in close cooperation with inspection bodies, fostering the critical alignment of the whole system with the principles of risk analysis. Beyond producing technically valid results, these laboratories should arguably be able to assist in the prediction and establishment of targets for official control. In pursuit of analytical excellence, the Brazilian government has developed a strategic plan for Official Agricultural Laboratories. Inserted in a national agenda for agricultural risk analysis, the plan has succeeded in raising laboratory budget by approximately 200%, it has started a rigorous program for personnel capacity-building, it has initiated strategic cooperation with international reference centres, and finally, it has completely renewed instrumental resources and rapidly triggered a program aimed at full laboratory compliance with ISO/IEC 17025 requirements.
Scheduling Accessory Assists Patients with Cognitive Disorders
NASA Technical Reports Server (NTRS)
2007-01-01
Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center
NASA HRP Plans for Collaboration at the IBMP Ground-Based Experimental Facility (NEK)
NASA Technical Reports Server (NTRS)
Cromwell, Ronita L.
2016-01-01
NASA and IBMP are planning research collaborations using the IBMP Ground-based Experimental Facility (NEK). The NEK offers unique capabilities to study the effects of isolation on behavioral health and performance as it relates to spaceflight. The NEK is comprised of multiple interconnected modules that range in size from 50-250m(sup3). Modules can be included or excluded in a given mission allowing for flexibility of platform design. The NEK complex includes a Mission Control Center for communications and monitoring of crew members. In an effort to begin these collaborations, a 2-week mission is planned for 2017. In this mission, scientific studies will be conducted to assess facility capabilities in preparation for longer duration missions. A second follow-on 2-week mission may be planned for early in 2018. In future years, long duration missions of 4, 8 and 12 months are being considered. Missions will include scenarios that simulate for example, transit to and from asteroids, the moon, or other interplanetary travel. Mission operations will be structured to include stressors such as, high workloads, communication delays, and sleep deprivation. Studies completed at the NEK will support International Space Station expeditions, and future exploration missions. Topics studied will include communication, crew autonomy, cultural diversity, human factors, and medical capabilities.
29 CFR 1956.52 - Completed developmental steps and certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Completed developmental steps and certification. 1956.52... PLANS New York § 1956.52 Completed developmental steps and certification. (a) In accordance with 29 CFR..., 2006 as having successfully completed all developmental steps specified in the plan as initially...
29 CFR 1956.44 - Completion of developmental steps and certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Completion of developmental steps and certification. 1956... PLANS Connecticut § 1956.44 Completion of developmental steps and certification. (a) In accordance with... August 19, 1986 as having completed all developmental steps specified in the plan as approved October 2...
Building Software Agents for Planning, Monitoring, and Optimizing Travel
2004-01-01
defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities
TDRSS momentum unload planning
NASA Technical Reports Server (NTRS)
Cross, George R.; Potter, Mitchell A.; Whitehead, J. Douglass; Smith, James T.
1991-01-01
A knowledge-based system is described which monitors TDRSS telemetry for problems in the momentum unload procedure. The system displays TDRSS telemetry and commands in real time via X-windows. The system constructs a momentum unload plan which agrees with the preferences of the attitude control specialists and the momentum growth characteristics of the individual spacecraft. During the execution of the plan, the system monitors the progress of the procedure and watches for unexpected problems.
An active monitoring method for flood events
NASA Astrophysics Data System (ADS)
Chen, Zeqiang; Chen, Nengcheng; Du, Wenying; Gong, Jianya
2018-07-01
Timely and active detecting and monitoring of a flood event are critical for a quick response, effective decision-making and disaster reduction. To achieve the purpose, this paper proposes an active service framework for flood monitoring based on Sensor Web services and an active model for the concrete implementation of the active service framework. The framework consists of two core components-active warning and active planning. The active warning component is based on a publish-subscribe mechanism implemented by the Sensor Event Service. The active planning component employs the Sensor Planning Service to control the execution of the schemes and models and plans the model input data. The active model, called SMDSA, defines the quantitative calculation method for five elements, scheme, model, data, sensor, and auxiliary information, as well as their associations. Experimental monitoring of the Liangzi Lake flood in the summer of 2010 is conducted to test the proposed framework and model. The results show that 1) the proposed active service framework is efficient for timely and automated flood monitoring. 2) The active model, SMDSA, is a quantitative calculation method used to monitor floods from manual intervention to automatic computation. 3) As much preliminary work as possible should be done to take full advantage of the active service framework and the active model.
ERIC Educational Resources Information Center
Henningsen, Mary Lynn Miller; Valde, Kathleen S.; Russell, Gregory A.; Russell, Gregory R.
2011-01-01
The goals-plans-actions model and the theory of planned behavior were used to predict what lead to students having a conversation about a disappointing grade with a faculty member. Participants (N = 130) completed two surveys. In the first survey, participants completed measures of primary and secondary goals, planning, decision to engage,…
Volunteer water monitoring: A guide for state managers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-08-01
Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...
PLANNING STUDY TO MODEL AND MONITOR COAL PILE RUNOFF. PHASE I
The report describes a planning study for predicting and monitoring the hydrologic and chemical characteristics of effluent streams resulting from precipitation impacting on open storage of coal. It includes: a survey of utilities on storage habits and treatment systems for coal ...
75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...
NASA Astrophysics Data System (ADS)
Xu, Sheng; Agarwal, Harsh; Bernardo, Marcelino; Seifabadi, Reza; Turkbey, Baris; Partanen, Ari; Negussie, Ayele; Glossop, Neil; Choyke, Peter; Pinto, Peter; Wood, Bradford J.
2016-03-01
Prostate cancer is often over treated with standard treatment options which impact the patients' quality of life. Laser ablation has emerged as a new approach to treat prostate cancer while sparing the healthy tissue around the tumor. Since laser ablation has a small treatment zone with high temperature, it is necessary to use accurate image guidance and treatment planning to enable full ablation of the tumor. Intraoperative temperature monitoring is also desirable to protect critical structures from being damaged in laser ablation. In response to these problems, we developed a navigation platform and integrated it with a clinical MRI scanner and a side firing laser ablation device. The system allows imaging, image guidance, treatment planning and temperature monitoring to be carried out on the same platform. Temperature sensing phantoms were developed to demonstrate the concept of iterative treatment planning and intraoperative temperature monitoring. Retrospective patient studies were also conducted to show the clinical feasibility of the system.
Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less
SU-E-T-605: Performance Evaluation of MLC Leaf-Sequencing Algorithms in Head-And-Neck IMRT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jing, J; Lin, H; Chow, J
2015-06-15
Purpose: To investigate the efficiency of three multileaf collimator (MLC) leaf-sequencing algorithms proposed by Galvin et al, Chen et al and Siochi et al using external beam treatment plans for head-and-neck intensity modulated radiation therapy (IMRT). Methods: IMRT plans for head-and-neck were created using the CORVUS treatment planning system. The plans were optimized and the fluence maps for all photon beams determined. Three different MLC leaf-sequencing algorithms based on Galvin et al, Chen et al and Siochi et al were used to calculate the final photon segmental fields and their monitor units in delivery. For comparison purpose, the maximum intensitymore » of fluence map was kept constant in different plans. The number of beam segments and total number of monitor units were calculated for the three algorithms. Results: From results of number of beam segments and total number of monitor units, we found that algorithm of Galvin et al had the largest number of monitor unit which was about 70% larger than the other two algorithms. Moreover, both algorithms of Galvin et al and Siochi et al have relatively lower number of beam segment compared to Chen et al. Although values of number of beam segment and total number of monitor unit calculated by different algorithms varied with the head-and-neck plans, it can be seen that algorithms of Galvin et al and Siochi et al performed well with a lower number of beam segment, though algorithm of Galvin et al had a larger total number of monitor units than Siochi et al. Conclusion: Although performance of the leaf-sequencing algorithm varied with different IMRT plans having different fluence maps, an evaluation is possible based on the calculated number of beam segment and monitor unit. In this study, algorithm by Siochi et al was found to be more efficient in the head-and-neck IMRT. The Project Sponsored by the Fundamental Research Funds for the Central Universities (J2014HGXJ0094) and the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry.« less
Monitoring long-term oral corticosteroids
Mundell, Lewis; Lindemann, Roberta; Douglas, James
2017-01-01
Corticosteroids are synthetic analogues of human hormones normally produced by the adrenal cortex. They have both glucocorticoid and mineralocorticoid properties. The glucocortoid components are anti-inflammatory, immunosuppressive, anti-proliferative and vasoconstrictive. They influence the metabolism of carbohydrate and protein, in addition to playing a key role in the body’s stress response. Mineralocorticoid’s main significance is in the balance of salt and water concentrations. Due to the combination of these effects, corticosteroids can cause many adverse effects. Oral corticosteroids are absorbed systemically and are therefore more likely to cause adverse effects than topical or inhaled corticosteroids. Furthermore, it is assumed that greater duration of treatment will lead to a greater number of adverse effects, and therefore the most at risk group are those taking high dose, long-term oral corticosteroids (LTOC). High dose is defined as a prescription of >5 mg oral prednisolone and long term as duration of treatment >1 month (based on National Institute for Health and Care Excellence guidance for patient’s ’at risk' of systemic side effects). Parameters to be monitored in primary care include weight, blood pressure, triglycerides, glucose and urea and electrolytes. From clinical experience within the general practice setting, the authors propose that these patients do not receive adequate baseline monitoring before starting corticosteroids nor are these markers monitored consistently thereafter. This project intended to evidence this claim, evaluate the adverse effect profile and improve monitoring in this patient group. The initial audit of 22 patients, within a single general practice, detected at least one documented adverse effect in 64% of patients, while 41% reported more than one adverse effect. 45% had recorded weight gain, 18% had recorded osteoporosis, 18% had at least one recorded cataract, 14% had recorded Hypertension, 14% had recorded diabetes mellitus, 9% had recorded dyspepsia and 5% had a recorded psychiatric complaint. All of these recorded conditions were either directly attributed to steroid medication or occurred since LTOC were prescribed. The aim of this project was to increase the percentage of patients on LTOC with complete baseline monitoring to 100%. ’Baseline monitoring' was defined as a measurement taken within the previous 5 years. Although somewhat arbitrary, 5 years was felt to be the maximum timeframe in which monitoring would still be relevant for comparison following introduction of LTOC. Quality improvement methodology was used throughout this project with multiple PDSA (Plan, Study, Do and Act) cycles. Through this, a monitoring system and protocol for patients taking LTOC was developed. As a result of this project, five adverse effects were detected in five different patients. These included two cases of secondary hypertension, one case of diabetes mellitus, one cataract and one case of adrenal insufficiency. 12 out of 20 patients achieved complete baseline monitoring. While this study did not fully achieve its aim, the aim was deliberately ambitious. As not all patients in this study attended for monitoring, a figure of 100% was impossible to achieve. The remaining ’incompletely monitored patients' had some but not all parameters measured. The creation of a staff protocol and increased clinical experience will ensure that complete monitoring takes place in the future. In conclusion, this project has shown that adverse effects from LTOC are prevalent in a single general practice population. It is also shown that monitoring for LTOC adverse effects is inadequate but can be improved relatively easily as skills and competencies from other medication monitoring systems already exist within healthcare settings and are immediately transferable. PMID:29450303
Monitoring long-term oral corticosteroids.
Mundell, Lewis; Lindemann, Roberta; Douglas, James
2017-01-01
Corticosteroids are synthetic analogues of human hormones normally produced by the adrenal cortex. They have both glucocorticoid and mineralocorticoid properties. The glucocortoid components are anti-inflammatory, immunosuppressive, anti-proliferative and vasoconstrictive. They influence the metabolism of carbohydrate and protein, in addition to playing a key role in the body's stress response. Mineralocorticoid's main significance is in the balance of salt and water concentrations. Due to the combination of these effects, corticosteroids can cause many adverse effects. Oral corticosteroids are absorbed systemically and are therefore more likely to cause adverse effects than topical or inhaled corticosteroids. Furthermore, it is assumed that greater duration of treatment will lead to a greater number of adverse effects, and therefore the most at risk group are those taking high dose, long-term oral corticosteroids (LTOC). High dose is defined as a prescription of >5 mg oral prednisolone and long term as duration of treatment >1 month (based on National Institute for Health and Care Excellence guidance for patient's 'at risk' of systemic side effects). Parameters to be monitored in primary care include weight, blood pressure, triglycerides, glucose and urea and electrolytes. From clinical experience within the general practice setting, the authors propose that these patients do not receive adequate baseline monitoring before starting corticosteroids nor are these markers monitored consistently thereafter. This project intended to evidence this claim, evaluate the adverse effect profile and improve monitoring in this patient group. The initial audit of 22 patients, within a single general practice, detected at least one documented adverse effect in 64% of patients, while 41% reported more than one adverse effect. 45% had recorded weight gain, 18% had recorded osteoporosis, 18% had at least one recorded cataract, 14% had recorded Hypertension, 14% had recorded diabetes mellitus, 9% had recorded dyspepsia and 5% had a recorded psychiatric complaint. All of these recorded conditions were either directly attributed to steroid medication or occurred since LTOC were prescribed. The aim of this project was to increase the percentage of patients on LTOC with complete baseline monitoring to 100%. 'Baseline monitoring' was defined as a measurement taken within the previous 5 years. Although somewhat arbitrary, 5 years was felt to be the maximum timeframe in which monitoring would still be relevant for comparison following introduction of LTOC. Quality improvement methodology was used throughout this project with multiple PDSA (Plan, Study, Do and Act) cycles. Through this, a monitoring system and protocol for patients taking LTOC was developed. As a result of this project, five adverse effects were detected in five different patients. These included two cases of secondary hypertension, one case of diabetes mellitus, one cataract and one case of adrenal insufficiency. 12 out of 20 patients achieved complete baseline monitoring. While this study did not fully achieve its aim, the aim was deliberately ambitious. As not all patients in this study attended for monitoring, a figure of 100% was impossible to achieve. The remaining 'incompletely monitored patients' had some but not all parameters measured. The creation of a staff protocol and increased clinical experience will ensure that complete monitoring takes place in the future. In conclusion, this project has shown that adverse effects from LTOC are prevalent in a single general practice population. It is also shown that monitoring for LTOC adverse effects is inadequate but can be improved relatively easily as skills and competencies from other medication monitoring systems already exist within healthcare settings and are immediately transferable.
40 CFR 413.03 - Monitoring requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no dumping... monitoring report. I further certify that this facility is implementing the toxic organic management plan... POTWs shall submit a toxic organic management plan that specifies to the control authority's...
Code of Federal Regulations, 2010 CFR
2010-07-01
... with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge... management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to the permitting...
A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases.
Narayanasamy, Ganesh; Stathakis, Sotirios; Gutierrez, Alonso N; Pappas, Evangelos; Crownover, Richard; Floyd, John R; Papanikolaou, Niko
2017-10-01
In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R 50% ), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R 50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 ( P < .05). For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V 12 Gy but required significantly lower monitor units, when compared to RapidArc plans.
A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases
Stathakis, Sotirios; Gutierrez, Alonso N.; Pappas, Evangelos; Crownover, Richard; Floyd, John R.; Papanikolaou, Niko
2016-01-01
Background: In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Methods: Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R50%), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. Results: A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 (P < .05). Conclusion: For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V12 Gy but required significantly lower monitor units, when compared to RapidArc plans. PMID:27612917
Structure, Intent and Conformance Monitoring in ATC
NASA Technical Reports Server (NTRS)
Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John
2004-01-01
Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.
The national response for preventing healthcare-associated infections: data and monitoring.
Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter
2014-02-01
Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frazier, William; Baur, Gary
2015-11-03
The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.
Dimethyl Disulfide (DMDS) Fumigant Management Plan Template Phase 2
These templates provide a framework for developing your FMP, including sections on your supervising pesticide applicator, buffer zones, emergency response plan, handler information, tarp plan, soil conditions, signage, and air monitoring plan.
[Compliance with guidelines by state plans for food and nutritional security in Brazil].
Machado, Mick Lennon; Gabriel, Cristine Garcia; Soar, Claudia; Mamed, Gisele Rockenbach; Machado, Patrícia Maria de Oliveira; Lacerda, Josimari Telino de; Martins, Milena Corrêa; Marcon, Maria Cristina
2018-02-05
A descriptive and documental study was performed from August to October 2016 to analyze compliance by state plans for food and nutritional security (PlanSAN) with the guidelines set by the Brazilian National Policy for Food and Nutritional Security (PNSAN). The state plans were accessed via the websites of the Inter-Ministerial Chamber for Food and Nutritional Security (CAISAN) or the state governments, plus complementary data collection at the state level. All the states of Brazil joined the National System for Food and Nutritional Security (SISAN), while fewer than half (13 states, 48%) had drafted their plans. Of these, 5 (38%) of the PlanSAN had schedules that coincided with the same state's pluriannual plan, 5 (38%) of the PlanSAN specified the budget requirements for meeting the proposed targets, 7 (54%) specified mechanisms for monitoring the plan, and only 2 (15%) defined methodologies for monitoring food and nutritional security. The recent existence of (and adherence to) the CAISAN appear to be related to the lack of state plans in half the states. Although most of the states that did have plans met some of the guidelines laid out by the PNSAN, these mechanisms become weak and impractical when they lack earmarked budget funds to meet their targets. Since the PNSAN is structurally inter-sectorial, the development of plans requires collective work by various government departments. Importantly, the items analyzed here are all guidelines, which implies the need for mechanisms to monitor their actual implementation.
Development of Computerized Monitoring of Education Plans.
ERIC Educational Resources Information Center
Greene, J. Weldon; And Others
The District of Columbia Public Schools initiated a multiyear planning process in 1983. Among other activities, the process calls for the computerized monitoring of the critical tasks of each of the district's major offices. These tasks, defined by the offices, are designed to facilitate the achievement of specific objectives designated in the…
DOT National Transportation Integrated Search
2008-08-01
Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...
40 CFR 52.70 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...
40 CFR 52.70 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...
77 FR 20217 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-03
... Planning and Standards (OAQPS), U.S. Environmental Protection Agency, Mail Code C504-06, Research Triangle... of Research 3. Implementation Challenges 4. Monitoring Plan Development and Stakeholder Participation B. Summary of Proposed Evaluation of Monitoring Methods C. Comments on Field Pilot Program and...
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round. Changes reflect performance of second round of testing at new location and with various changes to personnel. Additional changes reflect general improvements to the Version 1 test/QA...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2011 CFR
2011-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2013 CFR
2013-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2012 CFR
2012-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
20 CFR 653.108 - State agency self-monitoring.
Code of Federal Regulations, 2014 CFR
2014-04-01
... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...
40 CFR 62.14453 - What must I monitor?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability and Meetings... amended, NOAA is soliciting public comment on the draft management plan and draft environmental assessment... draft environmental assessment will be considered if received on or before June 22, 2012. Public...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-14
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...
Monitoring and Assuring the Quality of Digital Aerial Data
NASA Technical Reports Server (NTRS)
Christopherson, Jon
2007-01-01
This viewgraph presentation explains the USGS plan for monitoring and assuring the quality of digital aerial data. The contents include: 1) History of USGS Aerial Imaging Involvement; 2) USGS Research and Results; 3) Outline of USGS Quality Assurance Plan; 4) Other areas of Interest; and 5) Summary
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
1993 Annual Report: San Francisco estuary regional monitoring program for trace substances
Thompson, B.; Lacy, Jessica; Hardin, Dane; Grovhaug, Tom; Taberski, K.; Jassby, Alan D.; Cloern, James E.; Caffrey, J.; Cole, B.; Schoellhamer, David H.
1993-01-01
Summaries of other monitoring activities pertinent to regional monitoring are also included in the Report: a description of the Regional Board’s Bay Protection Studies, the Sacramento Coordinated Monitoring Program, and a wetlands monitoring plan are included.
Persistence with biologic therapies in the Medicare coverage gap.
Tamariz, Leonardo; Uribe, Claudia L; Luo, Jiacong; Hanna, John W; Ball, Daniel E; Krohn, Kelly; Meadows, Eric S
2011-11-01
To describe persistence with teriparatide and other biologic therapies in Medicare Part D plans with and without a coverage gap. Retrospective (2006) cohort study of Medicare Part D prescription drug plan beneficiaries from a large benefits company. Two plans with a coverage gap (defined as "basic") were combined and compared with a single plan with coverage for generic and branded medications (defined as "complete"). Patients taking alendronate (nonbiologic comparator), teriparatide, etanercept, adalimumab, interferon β-1a, or glatiramer acetate were selected for the study. For patients with complete coverage, equivalent financial thresholds were used to define the "gap."The definition of discontinuation was failure to fill the index prescription after reaching the gap. For alendronate, 27% of 133,260 patients had enrolled in the complete plan. Patients taking biologic therapies had more commonly enrolled in complete plans: teriparatide (66% of 6221), etanercept (58% of 1469), adalimumab (52% of 824), interferon β-1a (60% of 438), and glatiramer acetate (53% of 393). For patients taking either alendronate or teriparatide, discontinuation rates were higher in the basic, versus complete, plan (adjusted odds ratios, 2.02 and 3.56, respectively). Discontinuation did not significantly vary by plan type for etanercept, adalimumab, interferon β-1a, or glatiramer acetate. For patients who reached the coverage gap, discontinuation was more likely for patients taking osteoporosis (OP) medication. Not having a coverage gap was associated with improved persistence with OP treatment.
NASA Astrophysics Data System (ADS)
Prevedel, P.,; Wohlgemuth, L.; Legarth, B.; Henninges, J.; Schütt, H.; Schmidt-Hattenberger, C.; Norden, B.; Förster, A.; Hurter, S.
2009-04-01
This paper reports the CO2SINK drilling and permanent monitoring completions, as well as the well testing techniques applied in Europe's first scientific carbon dioxide onshore storage test in a saline aquifer near the town of Ketzin, 40 km east of Berlin/Germany. Three boreholes, one injection and two observation wells have been drilled in 2007 to a total depth of about 800 m. The wells were completed as "smart" wells containing a variety of permanently installed down-hole sensors, which have successfully proven their functionality during over their first injection year and are the key instruments for the continuous monitoring of the CO2 inside the reservoir during the storage phase. Constructing three wells in close proximity of 50 to 100m distance to each other with a dense sensor and monitoring cable population requires detailed planning and employment of high-end project management tools. All wells were cased with stainless final casings equipped with pre-perforated sand filters in the pay-zone and wired on the outside with two fibre-optical, one multi-conductor copper, and a PU-heating cable to the surface. The reservoir casing section is externally coated with a fibre-glass-resin wrap for electrical insulation of the 15 geo-electrical toroid antennas in the open hole section. A staged cementation program was selected in combination with the application of a newly developed swellable rubber packer technology and specialized cementation down-hole tools. This technology was given preference over perforation work inside the final casing at the reservoir face, which would have created unmanageable risks of potential damage of the outside casing cables. Prior to the start of the injection phase, an extensive production and injection well test program as well as well-to-well interference tests were performed in order to determine the optimum CO2 injection regime.
Augenstein, Tara M.; Thomas, Sarah A.; Ehrlich, Katherine B.; Daruwala, Samantha; Reyes, Shelby M.; Chrabaszcz, Jeffrey S.; De Los Reyes, Andres
2016-01-01
SYNOPSIS Objective Parents’ poor monitoring of adolescents’ whereabouts and activities is commonly linked to adolescents’ increased engagement in delinquent behaviors. Yet, different domains of parental monitoring (parental monitoring behaviors vs. parental knowledge) and reports from multiple informants (parent vs. adolescent) may vary in their links to delinquent behavior. Design Seventy-four parental caregivers and 74 adolescents completed survey measures of parental monitoring and knowledge, and adolescents completed self-report surveys of delinquent behavior. Results We observed low-to-moderate magnitudes of correspondence between parent- and adolescent-reports of parental monitoring behaviors and parental knowledge. Adolescent self-reported delinquent behavior related to parent and adolescent reports of parental monitoring behaviors and parental knowledge, with adolescents who self-reported engagement in delinquent behaviors evidencing lower levels of parental knowledge and higher levels of poor monitoring compared to adolescents who did not self-report engagement in delinquent behaviors. Adolescent self-reported engagement in delinquent behaviors evidenced stronger links to parental monitoring when based on adolescent reports of monitoring (relative to parent reports), whereas stronger links held between adolescent self-reported delinquent behavior and parental knowledge when based on parent reports of knowledge (relative to adolescent reports). Conclusions Links between monitoring and adolescents’ delinquent behavior vary by the kind of monitoring measure completed as well as the informant completing the measure. These findings inform measurement selection in research and clinical assessments of parental monitoring and adolescent delinquent behavior. PMID:27482171
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-12-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-02-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
3D conformal planning using low segment multi-criteria IMRT optimization
Khan, Fazal; Craft, David
2014-01-01
Purpose To evaluate automated multicriteria optimization (MCO) – designed for intensity modulated radiation therapy (IMRT), but invoked with limited segmentation – to efficiently produce high quality 3D conformal radiation therapy (3D-CRT) plans. Methods Ten patients previously planned with 3D-CRT to various disease sites (brain, breast, lung, abdomen, pelvis), were replanned with a low-segment inverse multicriteria optimized technique. The MCO-3D plans used the same beam geometry of the original 3D plans, but were limited to an energy of 6 MV. The MCO-3D plans were optimized using fluence-based MCO IMRT and then, after MCO navigation, segmented with a low number of segments. The 3D and MCO-3D plans were compared by evaluating mean dose for all structures, D95 (dose that 95% of the structure receives) and homogeneity indexes for targets, D1 and clinically appropriate dose volume objectives for individual organs at risk (OARs), monitor units (MUs), and physician preference. Results The MCO-3D plans reduced the OAR mean doses (41 out of a total of 45 OARs had a mean dose reduction, p<<0.01) and monitor units (seven out of ten plans have reduced MUs; the average reduction is 17%, p=0.08) while maintaining clinical standards on coverage and homogeneity of target volumes. All MCO-3D plans were preferred by physicians over their corresponding 3D plans. Conclusion High quality 3D plans can be produced using MCO-IMRT optimization, resulting in automated field-in-field type plans with good monitor unit efficiency. Adopting this technology in a clinic could improve plan quality, and streamline treatment plan production by utilizing a single system applicable to both IMRT and 3D planning. PMID:25413405
Reducing Risk for the Next Generation Nuclear Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
John M. Beck II; Harold J. Heydt; Emmanuel O. Opare
2010-07-01
The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less
Iraq liquid radioactive waste tanks maintenance and monitoring program plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad
2011-10-01
The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less
NASA Astrophysics Data System (ADS)
Pahlavani, Parham; Sheikhian, Hossein; Bigdeli, Behnaz
2017-10-01
Air pollution assessment is an imperative part of megacities planning and control. Hence, a new comprehensive approach for air pollution monitoring and assessment was introduced in this research. It comprises of three main sections: optimizing the existing air pollutant monitoring network, locating new stations to complete the coverage of the existing network, and finally, generating an air pollution map. In the first section, Shannon information index was used to find less informative stations to be candidate for removal. Then, a methodology was proposed to determine the areas which are not sufficiently covered by the current network. These areas are candidates for establishing new monitoring stations. The current air pollution monitoring network of Tehran was used as a case study, where the air pollution issue has been worsened due to the huge population, considerable commuters' absorption and topographic barriers. In this regard, O3, NO, NO2, NOx, CO, PM10, and PM2.5 were considered as the main pollutants of Tehran. Optimization step concluded that all the 16 active monitoring stations should be preserved. Analysis showed that about 35% of the Tehran's area is not properly covered by monitoring stations and about 30% of the area needs additional stations. The winter period in Tehran always faces the most severe air pollution in the year. Hence, to produce the air pollution map of Tehran, three-month of winter measurements of the mentioned pollutants, repeated for five years in the same period, were selected and extended to the entire area using the kriging method. Experts specified the contribution of each pollutant in overall air pollution. Experts' rankings aggregated by a fuzzy-overlay process. Resulted maps characterized the study area with crucial air pollution situation. According to the maps, more than 45% of the city area faced high pollution in the study period, while only less than 10% of the area showed low pollution. This situation confirms the need for effective plans to mitigate the severity of the problem. In addition, an effort made to investigate the rationality of the acquired air pollution map respect to the urban, cultural, and environmental characteristics of Tehran, which also confirmed the results.
Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sweeney, M.D.
1995-06-13
This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee
2003-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2004-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herk, A.; Poerschke, A.; Beach, R.
In 2012-2013, IBACOS worked with a builder, Brookfield Homes in Denver, Colorado, to design and construct a Passive House certified model home. IBACOS used several modeling programs and calculation methods to complete the final design package along with Brookfield's architect KGA Studio. This design package included upgrades to the thermal enclosure, basement insulation, windows, and heating, ventilation, and air conditioning. Short-term performance testing in the Passive House was done during construction and after construction. Testing with a blower door indicated that whole-building air leakage to the outside was 324 CFM and 0.60 ACH50. The other two test homes had littlemore » short-term testing done post-construction by the local energy rater. IBACOS then monitored the energy consumption and whole-house comfort conditions of that occupied Passive House after one year of operation and compared the monitoring results to those for two other occupied test houses in the same area with similar square footage but slightly different floor plans. IBACOS also assisted the builder, Brookfield Homes, in researching design scenarios for Zero Energy Ready Home and ENERGY STAR acceptance levels. IBACOS also assisted Brookfield in conceptualizing product for Denver's Brighton Heights area. Brookfield was considering building to Zero Energy Ready Home standards in that location. IBACOS provided strategies that Brookfield may draw from in the event the builder chooses to pursue a Zero Energy Ready Home plan for that market.« less
Active school travel: an evaluation of the Canadian school travel planning intervention.
Mammen, George; Stone, Michelle R; Faulkner, Guy; Ramanathan, Subha; Buliung, Ron; O'Brien, Catherine; Kennedy, Jacky
2014-03-01
Active school travel (AST) may provide a significant source of physical activity for children although rates of AST are declining in many countries. The objective of this study was to evaluate the Canadian School Travel Planning (STP) intervention by examining changes in school travel mode and predictors of mode change. Schools (n=106) across Canada participated between January 2010 and March 2012. STP committees implemented school-specific strategies to increase active school transport (AST) which included educational strategies, activities and events, capital improvement projects and enforcement initiatives. Travel mode at each school was assessed by a hands-up survey and school travel plans were reviewed for content. Complete data were available for 53 schools. There was no increase in AST at follow-up after one year. There was variation in mode change between schools. Only season of data collection predicted a decrease in AST in the morning (B=-5.36, p<.05). This Canadian STP evaluation showed no change in AST after one year. There was evidence of some localized success at nearly half of the participating schools. More robust monitoring and evaluation are needed to examine STP effectiveness. Copyright © 2013 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kern, J.J.
1978-01-01
The recently completed 800-mile trans-Alaska pipeline is reviewed from the perspective of its first six months of successful operation. Because of the many environmental and political constraints, the $7.7 billion project is viewed as a triumph of both engineering and capitalism. Design problems were imposed by the harsh climate and terrain and by the constant public and bureaucratic monitoring. Specifications are reviewed for the pipes, valves, river crossings, pump stations, control stations, and the terminal at Valdez, where special ballast treatment and a vapor-recovery system were required to protect the harbor's water and air quality. The article outlines operating proceduresmore » and contingency planning for the pipeline and terminal. (DCK)« less
Unexpected complication associated with balneotherapy: Skin and soft tissue infection
NASA Astrophysics Data System (ADS)
Alım, Bülent; Bostancı, Fahrettin; Servi, M. Alperen; Ćetinel, Sinan; Bingöl, M. Ozan
2017-04-01
Balneotherapy cure is an ongoing process, but patients can benefit most when cure is complete. For these reason, patients should be closely monitored and necessary precautions should be taken in terms of the complications that may occur in order to prevent the interruption or discontinuation of balneotherapy. Here, we wanted to represent a case that developed left leg soft tissue infection during the application of balneotherapy and because of this reason we stopped the balneotherapy As a result, when balneotherapy is planned for patients with risk factors such as diabetes and obesity, frequent examination of the skin and the application of skin moisturizers will be beneficial to prevent itching and skin dryness.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less
2007-07-20
KENNEDY SPACE CENTER, Fla. -- In the Payload Hazardous Servicing Facility, workers complete installing segments of the shipping canister around the base of the Phoenix Mars Lander. After the canning, the Phoenix will be transferred to Launch Pad 17-A on Cape Canaveral Air Force Station in Florida for launch on Aug. 3. Phoenix will land in icy soils near the north polar permanent ice cap of Mars and explore the history of the water in these soils and any associated rocks, while monitoring polar climate. Landing on Mars is planned in May 2008 on arctic ground where a mission currently in orbit, Mars Odyssey, has detected high concentrations of ice just beneath the top layer of soil. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
Gazda, Daniel B.; Schultz, John R.; Siperko, Lorraine M.; Porter, Marc D.; Lipert, Robert J.; Flint, Stephanie M.; McCoy, J. Torin
2011-01-01
The colorimetric water quality monitoring kit (CWQMK) was delivered to the International Space Station (ISS) on STS-128/17A and was initially deployed in September 2009. The kit was flown as a station development test objective (SDTO) experiment to evaluate the acceptability of colorimetric solid phase extraction (CSPE) technology for routine water quality monitoring on the ISS. During the SDTO experiment, water samples from the U.S. water processor assembly (WPA), the U.S. potable water dispenser (PWD), and the Russian system for dispensing ground-supplied water (SVO-ZV) were collected and analyzed with the CWQMK. Samples from the U.S. segment of the ISS were analyzed for molecular iodine, which is the biocide added to water in the WPA. Samples from the SVOZV system were analyzed for ionic silver, the biocide used on the Russian segment of the ISS. In all, thirteen in-flight analysis sessions were completed as part of the SDTO experiment. This paper provides an overview of the experiment and reports the results obtained with the CWQMK. The forward plan for certifying the CWQMK as operational hardware and expanding the capabilities of the kit are also discussed.
Structural health monitoring of wind turbine blades
NASA Astrophysics Data System (ADS)
Rumsey, Mark A.; Paquette, Joshua A.
2008-03-01
As electric utility wind turbines increase in size, and correspondingly, increase in initial capital investment cost, there is an increasing need to monitor the health of the structure. Acquiring an early indication of structural or mechanical problems allows operators to better plan for maintenance, possibly operate the machine in a de-rated condition rather than taking the unit off-line, or in the case of an emergency, shut the machine down to avoid further damage. This paper describes several promising structural health monitoring (SHM) techniques that were recently exercised during a fatigue test of a 9 meter glass-epoxy and carbon-epoxy wind turbine blade. The SHM systems were implemented by teams from NASA Kennedy Space Center, Purdue University and Virginia Tech. A commercial off-the-shelf acoustic emission (AE) NDT system gathered blade AE data throughout the test. At a fatigue load cycle rate around 1.2 Hertz, and after more than 4,000,000 fatigue cycles, the blade was diagnostically and visibly failing at the out-board blade spar-cap termination point at 4.5 meters. For safety reasons, the test was stopped just before the blade completely failed. This paper provides an overview of the SHM and NDT system setups and some current test results.
ICPP environmental monitoring report, CY 1989
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-01-01
Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Assurance (EA) Section of the Environmental Compliance and SIS Operations (EC/SIS) Department. Published in response to DOE Order 5484.1, Chap. 3, this report covers the period from December 20, 1988 through December 19, 1989. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs) as presented in DOE Order 5,400.05, and themore » State of Idaho Maximum Permissible Concentrations (MPCs). The Environmental Protection Agency (EPA) regulates all nonradiological waste resulting from the ICPP operations including all airborne, liquid, and solid waste. The EA Section completed a Quality Assurance (QA) Plan for Environmental Monitoring activities during the third quarter of 1986. QA activities have resulted in the ICPP's implementation of the Environmental Protection Agency rules and guidelines pertaining to the Collection, analyses, and reporting of environmentally related samples. Where no approved methods for analyses existed for radionuclides, currently used methods were submitted for the EPA approval. 17 figs., 11 tabs.« less
40 CFR 130.9 - Designation and de-designation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...
High priority needs for range-wide monitoring of North American landbirds
Dunn, Erica H.; Altman, B.L.; Bart, J.; Beardmore, C.J.; Berlanga, H.; Blancher, P.J.; Butcher, G.S.; Demarest, D.W.; Dettmers, R.; Hunter, W.C.; Iñigo-Elias, Eduardo E.; Panjabi, A.O.; Pashley, D.N.; Ralph, C.J.; Rich, T.D.; Rosenberg, K.V.; Rustay, C.M.; Ruth, J.M.; Will, T.C.
2005-01-01
This document is an extension of work done for the Partners in Flight North American Landbird Conservation Plan (Rich et al. 2004). The Continental Plan reviewed conservation status of the 448 native landbird species that regularly breed in the United States and Canada. Two groups of species were identified as having high conservation importance: the PIF Watch List, made up of species for which there is conservation concern, and Stewardship Spices that are particularly characteristic of regional avifaunas. In addition, continental scale monitoring needs were identified for all species. Here we extend the monitoring needs aspect of the Plan, providing additional detail and suggesting the best means of filling the gaps in broad-scale, long-term trend monitoring. This analysis and report was compiled by the Partners in Flight (PIF) Science Committee as a contribution to current work by the North American Bird Conservation Initiative to assess the status of bird population monitoring in North America and to make recommendations for improvements.
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2011 CFR
2011-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...
Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.
Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino
2018-01-01
This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU = 400 (-4.2%, p < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.
Hull, Ruth N; Luoma, Samuel N; Bayne, Bruce A; Iliff, John; Larkin, Daniel J; Paschke, Mark W; Victor, Sasha L; Ward, Sara E
2016-04-01
Ecosystem restoration planning near the beginning of the site assessment and management process ("early integration") involves consideration of restoration goals from the outset in developing solutions for contaminated ecosystems. There are limitations to integration that stem from institutional barriers, few successful precedents, and limited availability of guidance. Challenges occur in integrating expertise from various disciplines and multiple, sometimes divergent interests and goals. The more complex process can result in timing, capacity, communication, and collaboration challenges. On the other hand, integrating the 2 approaches presents new and creative opportunities. For example, integration allows early planning for expanding ecosystem services on or near contaminated lands or waters that might otherwise have been unaddressed by remediation alone. Integrated plans can explicitly pursue ecosystem services that have market value, which can add to funds for long-term monitoring and management. Early integration presents opportunities for improved and productive collaboration and coordination between ecosystem restoration and contaminant assessment and management. Examples exist where early integration facilitates liability resolution and generates positive public relations. Restoration planning and implementation before the completion of the contaminated site assessment, remediation, or management process ("early restoration") can facilitate coordination with offsite restoration options and a regional approach to restoration of contaminated environments. Integration of performance monitoring, for both remedial and restoration actions, can save resources and expand the interpretive power of results. Early integration may aid experimentation, which may be more feasible on contaminated lands than in many other situations. The potential application of concepts and tools from adaptive management is discussed as a way of avoiding pitfalls and achieving benefits in early integration. In any case, there will be challenges with early integration of restoration concepts for contaminated ecosystems, but the benefits are likely to outweigh them. © 2015 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John
2012-01-01
The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.
Evaluation of the Monitor-CTA Automatic Vehicle Monitoring System
DOT National Transportation Integrated Search
1974-03-01
In June 1972 the Urban Mass Transportation Administration requested that the Transportation System Center of DOT perform an evaluation of the CTA (Chicago Transit Authority) Monitor-Automatic Vehicle Monitor (AVM) system. TSC planned the overall eval...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
.... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...
Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.
ERIC Educational Resources Information Center
District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.
The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...
40 CFR 62.14454 - How must I monitor the required parameters?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How must I monitor the required parameters? 62.14454 Section 62.14454 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital...
No-migration variance petition. Appendices C--J: Volume 5, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-03-01
Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
2009-09-01
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less
Simons, Hannah R; Unger, Zoe D; Lopez, Priscilla M; Kohn, Julia E
2015-12-01
We estimated human papillomavirus (HPV) vaccine series completion and examined predictors of completion among adolescents and young adults in a large family planning network. Our retrospective cohort study of vaccine completion within 12 months and time to completion used electronic health record data from 119 Planned Parenthood health centers in 11 US states for 9648 patients who initiated HPV vaccination between January 2011 and January 2013. Among vaccine initiators, 29% completed the series within 12 months. Patients who were male, younger than 22 years, or non-Hispanic Black or who had public insurance were less likely to complete within 12 months and completed more slowly than their counterparts. Gender appeared to modify the effect of public versus private insurance on completion (adjusted hazard ratio = 0.76 for women and 0.95 for men; relative excess risk due to interaction = 0.41; 95% confidence interval = 0.09, 0.73). Completion was low yet similar to previous studies conducted in safety net settings.
Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Campbell, Sam
Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less
75 FR 9392 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
... monitoring; require electronic monitoring; and address other elements of catch monitoring in the Atlantic... development of catch monitoring alternatives for inclusion in Amendment 5 to the Atlantic Herring Fishery Management Plan (FMP); alternatives may include management measures to: improve quota monitoring and...
Avery, Lisa S; Du Plessis, Elsabé; Shaw, Souradet Y; Sankaran, Deepa; Njoroge, Peter; Kayima, Ruth; Makau, Naomi; Munga, James; Kadzo, Maureen; Blanchard, James; Crockett, Maryanne
2017-11-09
To determine whether a simple monitoring and tracking tool, Mwanzo Mwema Monitoring and Tracking Tool (MMATT), would enable community health volunteers (CHVs) in Kenya to 1) plan their workloads and activities, 2) identify the women, newborns and children most in need of accessing critical maternal, newborn and child health (MNCH) interventions and 3) improve key MNCH indicators. A mixed methods approach was used. Household surveys at baseline (n = 912) and endline (n = 1143) collected data on key MNCH indicators in the four subcounties of Taita Taveta County, Kenya. Eight focus group discussions were held with 40 CHVs to ascertain their perspectives on using the tool. Qualitative findings revealed that the CHVs found the MMATT to be useful in planning their activities and prioritizing beneficiaries requiring more support to access MNCH services. They also identified potential barriers to care at both the community and health system levels. At endline, previously pregnant women were more likely to have received four or more antenatal care visits, facility delivery, postnatal care within two weeks of delivery and a complete package of care than baseline respondents. Among women with children under 24 months, those at endline were more likely to report early breastfeeding and exclusive breastfeeding for the first six months. These results remained after adjustment for age, subcounty, gravida, mother's education and asset index. Our results demonstrate that simple tools enable CHVs to identify disparities in service delivery and health outcomes, and to identify barriers to MNCH care. Tools that enhance CHVs' ability to plan and prioritize the women and children most in need increase CHVs' potential impact.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Jason; Smith, Fred
This semiannual event includes sampling groundwater and surface water at the Monticello Disposal and Processing Sites. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated) and Program Directive MNT-2016-01. Complete sample sets were collected from 42 of 48 planned locations (9 of 9 former mill site wells, 13 of 13 downgradient wells, 7 of 9 downgradient permeable reactive barrier wells, 4 of 7 seeps and wetlands, and 9 of 10 surface water locations). Planned monitoring locations are shown in Attachment 1, Sampling andmore » Analysis Work Order. Locations R6-M3, SW00-01, Seep 1, Seep 2, and Seep 5 were not sampled due to insufficient water availability. A partial sample was collected at location R4-M3 due to insufficient water. All samples from the permeable reactive barrier wells were filtered as specified in the program directive. Duplicate samples were collected from surface water location Sorenson and from monitoring wells 92-07 and RlO-Ml. Water levels were measured at all sampled wells and an additional set of wells. See Attachment2, Trip Report for additional details. The contaminants of concern (COCs) for the Monticello sites are arsenic, manganese, molybdenum, nitrate+ nitrite as nitrogen (nitrate+ nitrite as N), selenium, uranium, and vanadium. Locations with COCs that exceeded remediation goals are listed in Table 1 and Table 2. Time-concentration graphs of the COCs for all groundwater and surface water locations are included in Attachment 3, Data Presentation. An assessment of anomalous data is included in Attachment 4.« less
Comparison of bird community indices for riparian restoration planning and monitoring
Young, Jock S.; Ammon, Elisabeth M.; Weisburg, Peter J.; Dilts, Thomas E.; Newton, Wesley E.; Wong-Kone, Diane C.; Heki, Lisa G.
2013-01-01
The use of a bird community index that characterizes ecosystem integrity is very attractive to conservation planners and habitat managers, particularly in the absence of any single focal species. In riparian areas of the western USA, several attempts at arriving at a community index signifying a functioning riparian bird community have been made previously, mostly resorting to expert opinions or national conservation rankings for species weights. Because extensive local and regional bird monitoring data were available for Nevada, we were able to develop three different indices that were derived empirically, rather than from expert opinion. We formally examined the use of three species weighting schemes in comparison with simple species richness, using different definitions of riparian species assemblage size, for the purpose of predicting community response to changes in vegetation structure from riparian restoration. For the three indices, species were weighted according to the following criteria: (1) the degree of riparian habitat specialization based on regional data, (2) the relative conservation ranking of landbird species, and (3) the degree to which a species is under-represented compared to the regional species pool for riparian areas. To evaluate the usefulness of these indices for habitat restoration planning and monitoring, we modeled them using habitat variables that are expected to respond to riparian restoration efforts, using data from 64 sampling sites in the Walker River Basin in Nevada and California. We found that none of the species-weighting schemes performed any better as an index for evaluating overall habitat condition than using species richness alone as a community index. Based on our findings, the use of a fairly complete list of 30–35 riparian specialists appears to be the best indicator group for predicting the response of bird communities to the restoration of riparian vegetation.
A new intrusion prevention model using planning knowledge graph
NASA Astrophysics Data System (ADS)
Cai, Zengyu; Feng, Yuan; Liu, Shuru; Gan, Yong
2013-03-01
Intelligent plan is a very important research in artificial intelligence, which has applied in network security. This paper proposes a new intrusion prevention model base on planning knowledge graph and discuses the system architecture and characteristics of this model. The Intrusion Prevention based on plan knowledge graph is completed by plan recognition based on planning knowledge graph, and the Intrusion response strategies and actions are completed by the hierarchical task network (HTN) planner in this paper. Intrusion prevention system has the advantages of intelligent planning, which has the advantage of the knowledge-sharing, the response focused, learning autonomy and protective ability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.« less
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
Liver enzyme monitoring in patients treated with troglitazone.
Graham, D J; Drinkard, C R; Shatin, D; Tsong, Y; Burgess, M J
2001-08-15
Soon after initial marketing in March 1997, troglitazone, the first thiazolidinedione antidiabetic agent, was found to cause life-threatening acute liver failure. The drug was removed from the market in March 2000. To evaluate the effect of US Food and Drug Administration (FDA) risk management efforts, including repeated labeling changes and "Dear Healthcare Professional" letters, on periodic liver enzyme monitoring of patients taking troglitazone. Claims data from a large, multistate managed care organization were used to establish 4 cohorts of patients (N = 7603) with at least 90 days of health plan enrollment before first troglitazone prescription during 4 consecutive periods spanning April 1997 to September 1999 and representing 4 progressively stringent liver monitoring recommendations. Percentage of eligible troglitazone users in each cohort with baseline, monthly (for up to 6 months of continuous use), and complete (baseline and monthly) enzyme monitoring, based on computerized records of laboratory claims. Baseline testing increased from 15% before any FDA monitoring recommendations (cohort 1) to 44.6% following 4 separate FDA interventions (cohort 4; P<.001). In cohort 4, 33.4% of users had follow-up testing after 1 month of therapy, falling to 13% after 5 months of continuous use. In all cohorts, less than 5% received all recommended liver enzyme tests by the third month of continuous use. The FDA risk management efforts did not achieve meaningful or sustained improvement in liver enzyme testing. Evaluation of the impact of regulatory actions is needed before such actions can be regarded as effective or sufficient.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, G.
2013-03-18
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less
NASA Astrophysics Data System (ADS)
Walter, Diana; Wegmuller, Urs; Spreckels, Volker; Busch, Wolfgang
2008-11-01
The main objective of the projects "Determination of ground motions in mining areas by interferometric analyses of ALOS data" (ALOS ADEN 3576, ESA) and "Monitoring of mining induced surface deformation" (ALOS-RA-094, JAXA) is to evaluate PALSAR data for surface deformation monitoring, using interferometric techniques. We present monitoring results of surface movements for an active hard coal colliery of the German hard coal mining company RAG Deutsche Steinkohle (RAG). Underground mining activities lead to ground movements at the surface with maximum subsidence rates of about 10cm per month for the test site. In these projects the L-band sensor clearly demonstrates the good potential for deformation monitoring in active mining areas, especially in rural areas. In comparison to C-band sensors we clearly observe advantages in resolving the high deformation gradients that are present in this area and we achieve a more complete spatial coverage than with C-band. Extensive validation data based on levelling data and GPS measurements are available within RAǴs GIS based database "GeoMon" and thus enable an adequate analysis of the quality of the interferometric results. Previous analyses confirm the good accuracy of PALSAR data for deformation monitoring in mining areas. Furthermore, we present results of special investigations like precision geocoding of PALSAR data and corner reflector analysis. At present only DInSAR results are obtained due to the currently available number of PALSAR scenes. For the future we plan to also apply Persistent Scatterer Interferometry (PSI) using longer series of PALSAR data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peelle, E.; Schweitzer, M.; Scharre, P.
1979-07-01
This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less
30 CFR 250.221 - What environmental monitoring information must accompany the EP?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What environmental monitoring information must... monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP: (a) Monitoring systems. A description of any existing and planned...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
29 CFR 1954.2 - Monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruggeman, David Alan
This report summarizes data completeness by tower and by instrument for 2016 and compares that data with the Los Alamos National Laboratory (LANL) and American National Standards Institute (ANSI) 2015 standards. This report is designed to make data users aware of data completeness and any data quality issues. LANL meteorology monitoring goals include 95% completeness for all measurements. The ANSI 2015 standard requires 90% completeness for all measurements. This report documents instrument/tower issues as they impact data completeness.
Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.
2013-01-01
This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate. However, a combination of funding growth and extensive collaboration with other USGS programs and other Federal, State, and local agencies, public interest groups, professional and trade associations, academia, and private industry will be needed to fully realize the monitoring and modeling goals laid out in this plan (USGS Fact Sheet 2013-3008).