DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-01
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.
Ten-year urban forestry action plan
J.W." Jerry" Van Sambeek
2017-01-01
The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...
Mentoring Graduate Students through the Action Research Journey Using Guiding Principles
ERIC Educational Resources Information Center
Spencer, Joi A.; Molina, Sarina Chugani
2018-01-01
Our department has adopted action research (AR) projects as the culminating task for our master's degree candidates. This article presents our work on mentoring graduate students towards the completion of their final AR research projects and details the deliberate structures put in place to guide them through the AR process. These structures…
NASA Astrophysics Data System (ADS)
Erdogan, Ibrahim; Campbell, Todd; Hashidah Abd-Hamid, Nor
2011-07-01
This study describes the development of an instrument to investigate the extent to which student-centered actions are occurring in science classrooms. The instrument was developed through the following five stages: (1) student action identification, (2) use of both national and international content experts to establish content validity, (3) refinement of the item pool based on reviewer comments, (4) pilot testing of the instrument, and (5) statistical reliability and item analysis leading to additional refinement and finalization of the instrument. In the field test, the instrument consisted of 26 items separated into four categories originally derived from student-centered instruction literature and used by the authors to sort student actions in previous research. The SACS was administered across 22 Grade 6-8 classrooms by 22 groups of observers, with a total of 67 SACS ratings completed. The finalized instrument was found to be internally consistent, with acceptable estimates from inter-rater intraclass correlation reliability coefficients at the p < 0.01 level. After the final stage of development, the SACS instrument consisted of 24 items separated into three categories, which aligned with the factor analysis clustering of the items. Additionally, concurrent validity of the SACS was established with the Reformed Teaching Observation Protocol. Based on the analyses completed, the SACS appears to be a useful instrument for inclusion in comprehensive assessment packages for illuminating the extent to which student-centered actions are occurring in science classrooms.
A Design Architecture for an Integrated Training System Decision Support System
1990-07-01
Sensory modes include visual, auditory, tactile, or kinesthetic; performance categories include time to complete , speed of response, or correct action ...procedures, and finally application and examples from the aviation proponency with emphasis on the LHX program. Appendix B is a complete bibliography...integrated analysis of ITS development. The approach was designed to provide an accurate and complete representation of the ITS development process and
Introduction to Toxicity and Risk Assessment for Project Chemists
2012-03-27
Toxicity of Hexavalent Chromium External review complete EPA will wait until studies underway on carcinogenic mode of action are complete to...finalize the assessment NJ and Cal values for hex chrome 16 Risk-Based Screening Levels Resident Soil (mg/kg) Resident Water Use (µg/L) DRAFT 0.04
2012-02-06
The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.
2008-07-10
The Food and Drug Administration (FDA) is amending its regulations on new drug applications (NDAs) and abbreviated new drug applications (ANDAs) for approval to market new drugs and generic drugs (drugs for which approval is sought in an ANDA). The final rule discontinues FDA's use of approvable letters and not approvable letters when taking action on marketing applications. Instead, we will send applicants a complete response letter to indicate that the review cycle for an application is complete and that the application is not ready for approval. We are also revising the regulations on extending the review cycle due to the submission of an amendment to an unapproved application and starting a new review cycle after the resubmission of an application following receipt of a complete response letter. In addition, we are adding to the regulations on biologics license applications (BLAs) provisions on the issuance of complete response letters to BLA applicants. We are taking these actions to implement the user fee performance goals referenced in the Prescription Drug User Fee Amendments of 2002 (PDUFA III) that address procedures and establish target timeframes for reviewing human drug applications.
77 FR 22837 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
...--National Marine Fisheries Service, Mr. Stan Glowacki, Protected Resources Division, Southwest Regional....glowacki@noaa.gov , the Section 7 consultation was completed on June 8, 2011. SUPPLEMENTARY INFORMATION...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-01
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-06-03
This Decision Document discusses the selection of no further action as the recommended action for four sites located at the Oliktok Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the eight sites located at the Oliktok Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, four sites are recommended for no further action.
10 CFR 1021.315 - Records of decision.
Code of Federal Regulations, 2010 CFR
2010-01-01
... EIS during a 30-day “waiting period” following completion of the final EIS, except as provided at 40... Availability for the final EIS is published in the Federal Register. (b) If DOE decides to take action on a proposal covered by an EIS, a ROD shall be prepared as provided at 40 CFR 1505.2 (except as provided at 40...
Congressional Budget Action for Fiscal Year 2012 and Its Impact on Education Funding. Issue Brief
ERIC Educational Resources Information Center
Delisle, Jason
2011-01-01
The fiscal year 2012 budget process has been anything but typical or predictable. While fiscal year 2012 starts in just a few weeks on October 1, 2011, the annual appropriations process is far from complete, and funding for federal education programs has not yet been finalized. Nevertheless, congressional action in the months that have led up to…
76 FR 59031 - Classification Challenge Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... CENTRAL INTELLIGENCE AGENCY 32 CFR Part 1907 Classification Challenge Regulations AGENCY: Central Intelligence Agency. ACTION: Final rule. SUMMARY: Consistent with Executive Order 13526, the Central Intelligence Agency (CIA) has undertaken and completed a review of its public Classification Challenge...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-05-03
This Decision Document discusses the selection of no further action as the recommended action for nine sites located at the Barter Island radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the 14 sites located at the Barter Island installation (U.S. Air Force 1996a,b). Based on the findings of these activities, nine sites are recommended for no further action.
Complete Lesson 9: All Together Now - Air, Water, Food, and Shelter
In this final lesson, the students will review the key concepts from the program and pledge, both as a class and individually, to take action to create a healthier environment for themselves and their community.
2010-06-02
Operations and maintenance OSHA Occupational Safety and Health Administration P2 Pollution prevention Pb Lead PFC Perfluorocarbon PG& E Pacific... lounge , a warehouse, Chapter 2. Description of the Proposed Action and Alternatives Final Environmental Assessment - California Space Center...Pacific Gas & Electric (PG& E ) for the entire Center, once a planned line is completed by PG& E . Acceptance of this approach is dependent on
Energy: Ford Foundation Study Urges Action on Conservation
ERIC Educational Resources Information Center
Hammond, Allen L.
1974-01-01
Announces completion of a final report and summarizes recommendations of the Ford Foundation Energy Policy Project based on analyses of three different scenarios of how America's energy future might develop. The study urges that many conservation measures be planned and implemented. (RH)
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
40 CFR 70.4 - State program submittals and transition.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...
78 FR 57838 - North American Free Trade Agreement Binational Panel Reviews
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... DEPARTMENT OF COMMERCE International Trade Administration [Secretariat File No. USA-MEX-2011- 1904... States Section, International Trade Administration, Department of Commerce. ACTION: Notice of completion of panel review of the Department of Commerce's final determination. SUMMARY: Pursuant to the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... engage in, support in any way or provide financial assistance for, license or permit, or approve any... Federal actions where either: (1) A National Environmental Policy Act (NEPA) analysis was completed as evidenced by a final environmental assessment (EA), environmental impact statement (EIS), or finding of no...
Titan 4 TPS Replacement Implementation Study
NASA Technical Reports Server (NTRS)
Jackson, Charles H.
1996-01-01
This final report documents the overall progress of the study. It is a general discussion of the documents reviewed, recommendations, trips taken, findings/observations, and proposed corrective actions. In addition, cost data for the contract is addressed. The normal abstract and executive summary provided with most final reports is also provided as a part of this report. A conclusion section is provided that addresses the relative completeness of the Titan 4 TPSR project and this contract.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-05-24
This Decision Document discusses the selection of no further action as the recommended action for two sites located at the Bullen Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the five sites located at the Bullen Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, two sites are recommended for no further action. Sites at the Bullen Point radar installation recommended for no further action are: Old Landfill/Dump Site East (LF06) and Drum Storage Area (SS10).
32 CFR 634.11 - Administrative due process for suspensions and revocations.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., military or civilian police report of apprehension, chemical test results if completed, refusal to consent... preliminary breath tests results, and other pertinent evidence. Immediate suspension should not be based... pre-determined by the final action authority. (6) For civilian personnel, written notice of suspension...
32 CFR 634.11 - Administrative due process for suspensions and revocations.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., military or civilian police report of apprehension, chemical test results if completed, refusal to consent... preliminary breath tests results, and other pertinent evidence. Immediate suspension should not be based... pre-determined by the final action authority. (6) For civilian personnel, written notice of suspension...
32 CFR 634.11 - Administrative due process for suspensions and revocations.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., military or civilian police report of apprehension, chemical test results if completed, refusal to consent... preliminary breath tests results, and other pertinent evidence. Immediate suspension should not be based... pre-determined by the final action authority. (6) For civilian personnel, written notice of suspension...
Final environmental impact statement for the Galileo Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1989-01-01
This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The only expected environmental effects of the proposed action are associated with normal launch vehicle operation, and are treated in published National Environmental Policy Act (NEPA) documents on the Shuttle (NASA 1978) and the Kennedy Space Center (NASA 1979), and in the KSC Environmental Resources Document (NASA 1986) and the Galileo Tier 1 EIS (NASA 1988a). The environmental impacts of a normal launch were deemed insufficient to preclude Shuttle operations. Environmental impacts may also result from launch or mission accidents that could release plutonium fuel used in the Galileo power system. Intensive analysis of the possible accidents associated with the proposed action reveal small health or environmental risks. There are no environmental impacts in the no-action alternative. The remote possibility of environmental impacts of the proposed action must be weighed against the large adverse fiscal and programmatic impacts inherent in the no-action alternative.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the Hipps Road Landfill Superfund Site (Site), located in Jacksonville, Florida, from the... than operation, maintenance, and five-year reviews have been completed. However, this deletion does not...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the Hipps Road Landfill Superfund Site (Site), located in Jacksonville, Florida, from the... than operation, maintenance, and five-year reviews have been completed. However, this deletion does not...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).
Risk Assessment Approach for the Hanford Site River Corridor Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomson, J.E.; Weiss, S.G.; Sands, J.P.
2007-07-01
The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less
Final voluntary release assessment/corrective action report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-12
The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resourcemore » Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.« less
Conte, D; Favero, T G; Niederhausen, M; Capranica, L; Tessitore, A
2017-06-01
The aim of this study was to examine the determinants of successful and unsuccessful fast-break (FB) actions in elite and sub-elite basketball games. Fifteen 1 st -division (elite) and fifteen 3 rd -division (sub-elite) Italian men's championship games were analysed across two seasons (2012/2013 and 2013/2014). A binary logistic regression analysis was performed, and the fast-break outcome (successful vs. unsuccessful) was adopted as the dependent variable separately in both elite and sub-elite games. FB execution (initiation, advance and completion phases), typology (primary and secondary break) and the number of players involved (equal number or superiority) were used as independent variables. The results showed that the rate of success of FB actions was 63.5% and 59.7% in elite and sub-elite games, respectively. Moreover, successful FBs were more likely to be completed in the lane in relation to unsuccessful ones in both elite and sub-elite games (p<0.05). Finally, descriptive statistics showed that both elite and sub-elite teams executed FBs similarly. This study highlighted that completion zone was the only predictor of a successful fast break in basketball, while the typology and number of players involved did not predict fast break effectiveness. Moreover, elite and sub-elite teams executed fast break actions similarly. These findings might be useful for basketball coaches to optimize the training of FB actions.
24 CFR 17.12 - Action on approved claim.
Code of Federal Regulations, 2010 CFR
2010-04-01
... section 2672 or 2677 of Title 28, United States Code, is final and conclusive on the claimant, his agent... presented, and constitutes a complete release of any claim against the United States and against any officer or employee of the Government whose act or omission gave rise to the claim, by reason of the same...
24 CFR 17.12 - Action on approved claim.
Code of Federal Regulations, 2011 CFR
2011-04-01
... section 2672 or 2677 of Title 28, United States Code, is final and conclusive on the claimant, his agent... presented, and constitutes a complete release of any claim against the United States and against any officer or employee of the Government whose act or omission gave rise to the claim, by reason of the same...
31 CFR 3.7 - Action on approved claims.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of section 2672 or 2677 of title 28, United States Code, shall be final and conclusive on the... claim has been presented, and shall constitute a complete release of any claim against the United States and against any employee of the Government whose act or omission gave rise to the claim, by reason of...
75 FR 39168 - Special Regulations; Areas of the National Park System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... his death in 1972. During the closure, we completed four projects: installation of a new HVAC system... to either bulge or crack. The existing HVAC system installed in 1985 failed to maintain a stable...; Areas of the National Park System AGENCY: National Park Service. ACTION: Final Rule. SUMMARY: The...
32 CFR 842.43 - Filing a claim.
Code of Federal Regulations, 2010 CFR
2010-07-01
... completed Standard Form 95 or other signed and written demand for money damages in a sum certain. A claim... Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE CLAIMS AND LITIGATION ADMINISTRATIVE... amend a claim at any time prior to final action. To amend a claim, the claimant or his or her authorized...
28 CFR 801.2 - Filing a claim.
Code of Federal Regulations, 2013 CFR
2013-07-01
... will include all necessary information for your claim is to submit a completed Standard Form 95 (“SF 95... this section) and on the Internet at http://www.usdoj.gov/civil/forms/forms.htm. (2) If you do not use... prior to final agency action or prior to your filing suit in court. ...
28 CFR 801.2 - Filing a claim.
Code of Federal Regulations, 2011 CFR
2011-07-01
... will include all necessary information for your claim is to submit a completed Standard Form 95 (“SF 95... this section) and on the Internet at http://www.usdoj.gov/civil/forms/forms.htm. (2) If you do not use... prior to final agency action or prior to your filing suit in court. ...
28 CFR 801.2 - Filing a claim.
Code of Federal Regulations, 2012 CFR
2012-07-01
... will include all necessary information for your claim is to submit a completed Standard Form 95 (“SF 95... this section) and on the Internet at http://www.usdoj.gov/civil/forms/forms.htm. (2) If you do not use... prior to final agency action or prior to your filing suit in court. ...
28 CFR 801.2 - Filing a claim.
Code of Federal Regulations, 2014 CFR
2014-07-01
... will include all necessary information for your claim is to submit a completed Standard Form 95 (“SF 95... this section) and on the Internet at http://www.usdoj.gov/civil/forms/forms.htm. (2) If you do not use... prior to final agency action or prior to your filing suit in court. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section constitute...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
76 FR 30550 - Federal Management Regulation; Change in Consumer Price Index Minimal Value
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... Minimal Value AGENCY: Office of Governmentwide Policy, GSA. ACTION: Final rule. SUMMARY: Pursuant to 5 U.S.C. 7342, at three-year intervals following January 1, 1981, the minimal value for foreign gifts must... required consultation has been completed and the minimal value has been increased to $350 or less as of...
75 FR 21749 - Spring 2010 Semiannual Agenda of Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
...In compliance with Executive Order 12866, entitled ``Regulatory Planning and Review,'' and the Regulatory Flexibility Act, as amended, the Department of Commerce (Department), in the spring and fall of each year, publishes in the Federal Register an agenda of regulations under development of review over the next 12 months. Rulemaking actions are grouped according to prerulemaking, proposed rules, final rules, long-term actions, and rulemaking actions completed since the fall 2009 agenda. The purpose of the agenda is to provide information to the public on regulations currently under review, being proposed, or issued by the Department. The agenda is intended to facilitate comments and views by interested members of the public.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-02-24
This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.
Hennessy, Michael; Bleakley, Amy; Ellithorpe, Morgan
2018-03-01
The reasoned action approach is one of the most successful behavioral theories in the history of social psychology. This study outlines the theoretical principles of reasoned action and considers when it is appropriate to augment it with a new variable. To demonstrate, we use survey data collected from a 4 to 17 year old U.S. adolescents to test how the 'prototype' variables fit into reasoned action approach. Through confirmatory factor analysis, we find that the prototype measures are normative pressure measures and when treated as a separate theoretical construct, prototype identity is not completely mediated by the proximal predictors of behavioral intention. We discuss the assumptions of the two theories and finally consider the distinction between augmenting a specific theory versus combining measures derived from different theoretical perspectives.
Favero, TG; Niederhausen, M; Capranica, L; Tessitore, A
2017-01-01
The aim of this study was to examine the determinants of successful and unsuccessful fast-break (FB) actions in elite and sub-elite basketball games. Fifteen 1st-division (elite) and fifteen 3rd-division (sub-elite) Italian men’s championship games were analysed across two seasons (2012/2013 and 2013/2014). A binary logistic regression analysis was performed, and the fast-break outcome (successful vs. unsuccessful) was adopted as the dependent variable separately in both elite and sub-elite games. FB execution (initiation, advance and completion phases), typology (primary and secondary break) and the number of players involved (equal number or superiority) were used as independent variables. The results showed that the rate of success of FB actions was 63.5% and 59.7% in elite and sub-elite games, respectively. Moreover, successful FBs were more likely to be completed in the lane in relation to unsuccessful ones in both elite and sub-elite games (p<0.05). Finally, descriptive statistics showed that both elite and sub-elite teams executed FBs similarly. This study highlighted that completion zone was the only predictor of a successful fast break in basketball, while the typology and number of players involved did not predict fast break effectiveness. Moreover, elite and sub-elite teams executed fast break actions similarly. These findings might be useful for basketball coaches to optimize the training of FB actions. PMID:28566812
[The role of Sabin inactivated poliovirus vaccine in the final phase of global polio eradication].
Dong, S Z; Zhu, W B
2016-12-06
Global polio eradication has entered its final phase, but still faces enormous challenges. The Polio Eradication and Endgame Strategic Plan (2013-2018) set the target for making the world polio-free by 2018. Meanwhile, the World Heath Organization Global Action Plan (GAP Ⅲ) recommended that polioviruses be stored under strict conditions after eradication of the wild poliovirus. At least one dose of inactivated poliovirus vaccine (IPV) would be required for each newborn baby in the world to ensure successful completion of the final strategy and GAP Ⅲ. The Sabin IPV has a high production safety and low production cost, compared with the wild-virus IPV and, therefore, can play an important role in the final stage of global polio eradication.
ERIC Educational Resources Information Center
Du Preez, Jeanetta; Steyn, Tobia; Owen, Rina
2008-01-01
Ongoing action research at the University of Pretoria investigates first-year students' preparedness for a study in calculus. In 2005 first-year engineering students completed a mathematics diagnostic survey at the beginning and end of the year. In this article the results of the 2005 survey are compared with the students' final school marks in…
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
Tanaka, Hiroko
2015-01-01
Conversation analytic work has revealed how anticipatory completions and preemptive actions can offer invaluable glimpses into the cognitive, contextual, grammatical, and temporal bases of projectability in turn-taking, by virtue of their potential not only as a display of participants' online prediction of roughly what it might take to complete a turn-in-progress but also to plan the next move. While the predicate-final word order and the incremental transformability of turns in Japanese generally lead to delayed projectability of turn-endings, this may be partially offset by the capacity of certain postpositional particles to trigger and propel prospective action trajectories. This article engages in a case study of the topic particle wa (and related particles mo and tte), by demonstrating how its grammatical affordances, the categorization activities, and cognitive processing it can set in motion, coupled with the immediate contextual, and temporal-productional features may coalesce to a point of critical mass, thereby enhancing the projectability of the not-yet-produced trajectory of the current turn. The discussion attempts to contribute to recent debates on ways language-specific lexicogrammatical resources are deeply interlinked with the types of opportunities that are provided for social action. PMID:26379565
Exploring soft constraints on effective actions
NASA Astrophysics Data System (ADS)
Bianchi, Massimo; Guerrieri, Andrea L.; Huang, Yu-tin; Lee, Chao-Jung; Wen, Congkao
2016-10-01
We study effective actions for simultaneous breaking of space-time and internal symmetries. Novel features arise due to the mixing of Goldstone modes under the broken symmetries which, in contrast to the usual Adler's zero, leads to non-vanishing soft limits. Such scenarios are common for spontaneously broken SCFT's. We explicitly test these soft theorems for N=4 sYM in the Coulomb branch both perturbatively and non-perturbatively. We explore the soft constraints systematically utilizing recursion relations. In the pure dilaton sector of a general CFT, we show that all amplitudes up to order s n ˜ ∂2 n are completely determined in terms of the k-point amplitudes at order s k with k ≤ n. Terms with at most one derivative acting on each dilaton insertion are completely fixed and coincide with those appearing in the conformal DBI, i.e. DBI in AdS. With maximal supersymmetry, the effective actions are further constrained, leading to new non-renormalization theorems. In particular, the effective action is fixed up to eight derivatives in terms of just one unknown four-point coefficient and one more coefficient for ten-derivative terms. Finally, we also study the interplay between scale and conformal invariance in this context.
Prototypes Reflect Normative Perceptions: Implications for the Development of Reasoned Action Theory
Hennessy, Michael; Bleakley, Amy; Ellithorpe, Morgan
2017-01-01
The reasoned action approach is one of the most successful behavioral theories in the history of social psychology. This study outlines the theoretical principles of reasoned action and considers when it is appropriate to augment it with a new variable. To demonstrate, we use survey data collected from a 4–17 year old U.S. adolescents to test how the “prototype” variables fit into reasoned action approach. Through confirmatory factor analysis, we find that the prototype measures are normative pressure measures and when treated as a separate theoretical construct, prototype identity is not completely mediated by the proximal predictors of behavioral intention. We discuss the assumptions of the two theories and finally consider the distinction between augmenting a specific theory versus combining measures derived from different theoretical perspectives. PMID:28612624
Sen. Warner, Mark R. [D-VA
2013-01-02
Senate - 01/02/2013 Submitted in the Senate, considered, and agreed to without amendment and with a preamble by Unanimous Consent. (All Actions) Tracker: This bill has the status Agreed to in SenateHere are the steps for Status of Legislation:
On non-BPS effective actions of string theory
NASA Astrophysics Data System (ADS)
Hatefi, Ehsan
2018-05-01
We discuss some physical prospective of the non-BPS effective actions of type IIA and IIB superstring theories. By dealing with all complete three and four point functions, including a closed Ramond-Ramond string (in terms of both its field strength and its potential), gauge (scalar) fields as well as a real tachyon and under symmetry structures, we find various restricted world volume and bulk Bianchi identities. The complete forms of the non-BPS scattering amplitudes including their Chan-Paton factors are elaborated. All the singularity structures of the non-BPS amplitudes, their all order α ' higher-derivative corrections, their contact terms and various modified Bianchi identities are derived. Finally, we show that scattering amplitudes computed in different super-ghost pictures are compatible when suitable Bianchi identities are imposed on the Ramond-Ramond fields. Moreover, we argue that the higher-derivative expansion in powers of the momenta of the tachyon is universal.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Defense Logistics Agency Procurements from Federal Prison Industries, Inc.
1998-10-05
an arbitration board. The decision of the arbitration board is "final and binding upon all parties." Department of Justice Opinion. Because of the...summary of prior audit coverage related to the audit objectives. 3 Finding A. Dispute Resolution The statutory prcess and regulatory procedures for...buying decisions . Action is to be completed by December 1998. 19 Finding C. Exercising Federal Prison Industries, Inc. Warranty Defense supply centers
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
The Planning, Programming and Budgeting System (PPBS). A Primer
1987-01-01
Commands input through the JCS as well The DRB reviews and resolves major issues , as required, prior t.o final DG publication . DG is designed to...Air Staff action officer, and takes you through a complete PPBS cycle as an aid to better understanding the overall process. You will find that it...JPAM) 34 -- ISSUES 35 -- THE PROGRAM DECISION MEMORANDUM (PDM) 36 - THE BUDGET ESTIMATE SUBMISSION (BES) 37 o BUDGETING 38 - BUDGET REVIEW - PROGRAM
The Role of the Global SOF Network in a Resource Constrained Environment
2013-11-01
backed by actions. Step Two: Matching Skill Sets with Individuals: Who Needs to Know What? This step sounds simple enough in theory . You need to...Training Finally, step five is the recognition that, like physical training and condition- ing, cognitive skills need to be continuously refreshed. These...and maintaining the data needed , and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other
Environmental Assessment for the California Space Center at Vandenberg Air Force Base, California
2010-04-08
Occupational Safety and Health Administration P2 Pollution prevention Pb Lead PFC Perfluorocarbon PG& E Pacific Gas & Electric PM2.5 Particulate matter 2.5...services center, a commissary and staff lounge , a warehouse, Chapter 2. Description of the Proposed Action and Alternatives Final Draft...including tenants. Ultimately, the CSC would obtain service from Pacific Gas & Electric (PG& E ) for the entire Center, once a planned line is completed by
Thin layer chromatographic method for the detection of uric acid: collaborative study.
Thrasher, J J; Abadie, A
1978-07-01
A collaborative study has been completed on an improved method for the detection and confirmation of uric acid from bird and insect excreta. The proposed method involves the lithium carbonate solubilization of the suspect excreta material, followed by butanol-methanol-water-acetic acid thin layer chromatography, and trisodium phosphate-phosphotungstic acid color development. The collaborative tests resulted in 100% detection of uric acid standard at the 50 ng level and 75% detection at the 20-25 ng level. No false positives were reported during tests of compounds similar to uric acid. The proposed method has been adopted official first action; the present official final action method, 44.161, will be retained for screening purposes.
76 FR 9853 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
31 CFR 800.601 - Finality of actions under section 721.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under section...
Sharbanee, Jason M.; Hu, Litje; Stritzke, Werner G. K.; Wiers, Reinout W.; Rinck, Mike; MacLeod, Colin
2014-01-01
Training people to respond to alcohol images by making avoidance joystick movements can affect subsequent alcohol consumption, and has shown initial efficacy as a treatment adjunct. However, the mechanisms that underlie the training’s efficacy are unknown. The present study aimed to determine 1) whether the training’s effect is mediated by a change in action tendency or a change in selective attention, and 2) whether the training’s effect is moderated by individual differences in working memory capacity (WMC). Three groups of social drinkers (total N = 74) completed either approach-alcohol training, avoid-alcohol training or a sham-training on the Approach-Avoidance Task (AAT). Participants’ WMC was assessed prior to training, while their alcohol-related action tendency and selective attention were assessed before and after the training on the recently developed Selective-Attention/Action Tendency Task (SA/ATT), before finally completing an alcohol taste-test. There was no significant main effect of approach/avoidance training on alcohol consumption during the taste-test. However, there was a significant indirect effect of training on alcohol consumption mediated by a change in action tendency, but no indirect effect mediated by a change in selective attention. There was inconsistent evidence of WMC moderating training efficacy, with moderation found only for the effect of approach-alcohol training on the AAT but not on the SA/ATT. Thus approach/avoidance training affects alcohol consumption specifically by changing the underlying action tendency. Multiple training sessions may be required in order to observe more substantive changes in drinking behaviour. PMID:24465750
17 CFR 1.67 - Notification of final disciplinary action involving financial harm to a customer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... disciplinary action involving financial harm to a customer. 1.67 Section 1.67 Commodity and Securities... Miscellaneous § 1.67 Notification of final disciplinary action involving financial harm to a customer. (a) Definitions. For purposes of this section: (1) Final disciplinary action means any decision by or settlement...
77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Fore River Bridge..., 2012, the FHWA published ``Notice of Final Federal Agency Actions on Proposed Bridge in Massachusetts...
Kinesthesis can make an invisible hand visible
Dieter, Kevin C.; Hu, Bo; Knill, David C.; Blake, Randolph; Tadin, Duje
2014-01-01
Self-generated body movements have reliable visual consequences. This predictive association between vision and action likely underlies modulatory effects of action on visual processing. However, it is unknown if our own actions can have generative effects on visual perception. We asked whether, in total darkness, self-generated body movements are sufficient to evoke normally concomitant visual perceptions. Using a deceptive experimental design, we discovered that waving one’s own hand in front of one’s covered eyes can cause visual sensations of motion. Conjecturing that these visual sensations arise from multisensory connectivity, we showed that individuals with synesthesia experience substantially stronger kinesthesis-induced visual sensations. Finally, we found that the perceived vividness of kinesthesis-induced visual sensations predicted participants’ ability to smoothly eye-track self-generated hand movements in darkness, indicating that these sensations function like typical retinally-driven visual sensations. Evidently, even in the complete absence of external visual input, our brains predict visual consequences of our actions. PMID:24171930
Tal, Alon; Aharon, Yaara; Yuhas-Peled, Hadar
2010-04-01
Most environmental enforcement programs have separate criminal and administrative procedures for addressing violations. Pitting "criminal"versus"administrative" enforcement as mutually exclusive alternatives constitutes a "false dilemma". Clearly, the government response should be influenced by the severity of pollution and the specific circumstances of the polluter. Yet, policy makers seeking to improve environmental compliance need to have a clearer picture about the merits of each approach and their relative effectiveness. This research empirically assesses the effectiveness of criminal versus administrative enforcement activities in Israel. After considering the philosophical implications associated with each regulatory approach, the results of a year-long study are presented. A series of performance indicators are utilized, with particular weight on compliance status in the field, to assess the condition of environmental violations several years subsequent to completion of enforcement activities. The state of 100 violations of air, water and hazardous materials laws that had been addressed through the criminal process were matched with results of comparable violations, against which administrative actions were taken. Results suggest that while criminal enforcement is a longer process, compliance following these actions was significantly greater than in administrative enforcement cases. The findings also underline the significance of a systematic follow-up system for tracking violations after enforcement actions are complete. Finally, the study confirms the benefits of targeted assistance to improve compliance among violators of environmental standards.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9179-3 ] Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the final agency action on one TMDL established by...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Final action. 92.17 Section 92.17... Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making a... Notice of Assessment (or on demand under paragraph (c)(3)(ii)(D) of this section), a civil action to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
...: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to correct an... ozone. EPA is also taking final action to revise the boundaries of certain Southern California air...-2012-0936 for this action. The index to the docket is available electronically at www.regulations.gov...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, M.K.
1994-06-01
The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternativesmore » in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort.« less
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... Ambient Air Quality Standard (NAAQS) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... of the 1997 8-hour ozone NAAQS as of the applicable date. DATES: Effective Date: This final rule will... action is EPA taking in this final rule? II. What is the background for this final action? III. What was...
1974-01-02
Disjointed..,little continuity - Omission of the "why" of training, which leaves it up to the individual student to determine the importance of the...the student when a response was required. A "roll- up " function caused old information on the screen to be completely or partially removed, depending on...each game inter- action, the student is asked questions which build up to a generalized statement of the rounding rules. Finally, the criterion items
78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C.... DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139...
78 FR 58381 - Notice of Final Federal Agency Actions on State Highway 288 in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the research misconduct issues and the HHS administrative actions become final and will be implemented, except that the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... on behalf of the applicant; (4) The decision of the DRB; (5) Advisory opinions relief upon for the final action; and (6) The final action on the DRB decision by the Commandant or Secretary. (b) The... the decision of the DRB and the final action thereon is made available for public inspection and...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED... Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of...
Completed egoism and intended altruism boost healthy food choices.
Weibel, Christian; Messner, Claude; Brügger, Adrian
2014-06-01
Based on the self-licensing literature and goal theory, we expected and found that completed (im)moral actions lead to markedly different food choices (Studies 1 & 2) than intended (im)moral actions (Study 2). In Study 1, people more often chose healthy over unhealthy food options when they recalled a completed egoistic action than when they recalled a completed altruistic action. Study 2 confirmed this finding and furthermore showed that the self-licensing effect in food choices is moderated by the action stage (completed versus intended) of the moral or immoral action. This article extends the existing self-licensing literature and opens up new perspectives for changing consumers' food consumption behavior. Copyright © 2014 Elsevier Ltd. All rights reserved.
77 FR 47517 - Enforcement Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Part 573 Enforcement Actions AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY: The National Indian Gaming... be considered final agency action by a court even though it is issued by NIGC staff rather than the...
2015-05-15
The Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to extend the temporary placement of (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, in schedule I of the Controlled Substances Act. The current final order temporarily placing UR-144, XLR11, and AKB48 in schedule I is due to expire on May 15, 2015. This final order will extend the temporary scheduling of UR-144, XLR11, and AKB48 to May 15, 2016, or until the permanent scheduling action for these three substances is completed, whichever occurs first.
Agent Communication for Dynamic Belief Update
NASA Astrophysics Data System (ADS)
Kobayashi, Mikito; Tojo, Satoshi
Thus far, various formalizations of rational / logical agent model have been proposed. In this paper, we include the notion of communication channel and belief modality into update logic, and introduce Belief Update Logic (BUL). First, we discuss that how we can reformalize the inform action of FIPA-ACL into communication channel, which represents a connection between agents. Thus, our agents can send a message only when they believe, and also there actually is, a channel between him / her and a receiver. Then, we present a static belief logic (BL) and show its soundness and completeness. Next, we develop the logic to BUL, which can update Kripke model by the inform action; in which we show that in the updated model the belief operator also satisfies K45. Thereafter, we show that every sentence in BUL can be translated into BL; thus, we can contend that BUL is also sound and complete. Furthermore, we discuss the features of CUL, including the case of inconsistent information, as well as channel transmission. Finally, we summarize our contribution and discuss some future issues.
A Biologically Inspired Computational Model of Basal Ganglia in Action Selection.
Baston, Chiara; Ursino, Mauro
2015-01-01
The basal ganglia (BG) are a subcortical structure implicated in action selection. The aim of this work is to present a new cognitive neuroscience model of the BG, which aspires to represent a parsimonious balance between simplicity and completeness. The model includes the 3 main pathways operating in the BG circuitry, that is, the direct (Go), indirect (NoGo), and hyperdirect pathways. The main original aspects, compared with previous models, are the use of a two-term Hebb rule to train synapses in the striatum, based exclusively on neuronal activity changes caused by dopamine peaks or dips, and the role of the cholinergic interneurons (affected by dopamine themselves) during learning. Some examples are displayed, concerning a few paradigmatic cases: action selection in basal conditions, action selection in the presence of a strong conflict (where the role of the hyperdirect pathway emerges), synapse changes induced by phasic dopamine, and learning new actions based on a previous history of rewards and punishments. Finally, some simulations show model working in conditions of altered dopamine levels, to illustrate pathological cases (dopamine depletion in parkinsonian subjects or dopamine hypermedication). Due to its parsimonious approach, the model may represent a straightforward tool to analyze BG functionality in behavioral experiments.
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESPONSIBILITY ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member... well as the Proceeding Clerk and Secretary of the Commission, with a written notice of any final...
ERIC Educational Resources Information Center
Southern Regional Education Board (SREB), 2010
2010-01-01
The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. This report presents final legislative and budget actions in…
77 FR 66910 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice...). A claim seeking judicial review of the Federal agency actions on the highway project will be barred...
Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer
This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.Only NPL sites have been included in Cleanups in My Community thus far. EPA maintains the NPL, which identifies for the States and the public those sites or other releases that appear to warrant remedial (long term) actions. These NPL sites fall into the following categories:Proposed: Sites may be proposed for the NPL and then may be placed on the NPL as final or be removed from the Proposed NPL.Final: Those sites placed on the NPL are called final, and for these sites, a cleanup remedy is selected and implemented. However, it may be several years after construction of the remedy is completed before the hazardous substances are completely cleaned up or controlled in place.Deleted: After the clean up process is complete, and appropriate reviews confirm the area is cleaned up or the hazards are controlled, sites can be deleted from the NPL.For more information on the data provided through this web service, please see the processing steps below, and see more information here: https://www.
PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Payette; D. Tillman
During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barber, Brenda; Honerlah, Hans; O'Neill, Mike
2012-07-01
Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineersmore » (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)« less
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-09-11
The Cemetery Dump Site is located in Oakland County, Michigan, approximately 35 miles northwest of Detroit. The 4-acre site was once used as a sand and gravel pit and has been backfilled and cleared. Citizen reports allege that approximately 300 to 600 barrels were dumped and buried onsite in the late 1960s or early 1970s. In September 1981, the Michigan Department of Natural Resources excavated and transported offsite approximately 20 to 30 barrel fragments. Analysis of the barrel contents indicated the presence of paint sludges, solvents, PCBs, and oils. This ROD is a source-control remedial action that includes excavation andmore » disposal of approximately 250 drums at an offsite RCRA facility. Total capital cost for the selected remedial action is estimated to be $1,883,261. Any additional remedial actions will be addressed in a separate Record of Decision upon completion of the RI/FS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beranich, S.J.
1994-08-24
This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less
North Slope (Wahluke Slope) expedited response action cleanup plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part ofmore » the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
...On January 30, 2012, the EPA proposed revisions to several provisions of the final National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources. The proposed revisions were made, in part, in response to a petition for reconsideration received by the Administrator following the promulgation of the October 29, 2009, final rule (``2009 final rule''). In this action, the EPA is finalizing those amendments, lifting the stay of the title V permit requirement issued on March 14, 2011, and lifting the stay of the final rule issued on October 25, 2012. In addition, this final action includes revisions to the EPA's approach for addressing malfunctions and standards applicable during startup and shutdown periods. This final action also includes amendments and technical corrections to the final rule to clarify applicability and compliance issues raised by stakeholders subject to the 2009 final rule. The revisions to the final rule do not reduce the level of environmental protection or emissions control on sources regulated by this rule but provide flexibility and clarity to improve implementation. This action also extends the compliance date for existing sources and the EPA's final response to all issues raised in the petition for reconsideration.
78 FR 64595 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Illinois AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Sec. 139(l)(1). The actions relate to a proposed highway project, Circle Interchange, I-90/I-94 and I...
78 FR 17748 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...; telephone: 801-955-3516; email: david.cox@dot.gov . The FHWA Utah Division Office's normal business hours... announces actions taken by the FWHA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the FHWA actions on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
... Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by the..., that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed Physical... 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway...
77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
.... ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
Planning the Transition to Long-Term Stewardship for the River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cearlock, C.S.; Lerch, J.A.; Sands, J.P.
2007-07-01
Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less
77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
...-3516; email: David.Cox@dot.gov . The FHWA Utah Division's normal business hours are Monday through... announces actions taken by the FHWA and other Federal Agencies that are final within the meaning of 23 U.S.C... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review...
Quick Reaction Report on DoD Procurements Through the Tennessee Valley Authority
1992-04-03
from non-DoD agencies that includes sections to be completed and signed by a contracting officer. Recommendations for Corrective Actions We recommend...in the DD 350 Individual Contract Action Reporting System. The Assistant Secretary did not provide planned dates for completing the corrective actions ...will be reprocured. Tentative milestones for completion of the corrective actions were not identified. Defense Logistics Agency comments. The Deputy
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... (FHWA), U.S. DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
NASA Technical Reports Server (NTRS)
Woodward, Hugh
2005-01-01
Remote meetings are best for updates and information sharing, but it is possible to effectively facilitate decisions with a little planning. Generally, the meeting leader needs to clearly state the proposed decision and then separately poll each participant for concurrence. Normally, there will be a range of responses, requiring the facilitator to restate the proposal and repeat the process. Several iterations may be required before a consensus is achieved. I usually confirm decisions by restating the conclusion as it will appear in the meeting notes and asking the participants to express any objections. Gaining commitment to follow-up actions is never easy, of course, but tends to be particularly tricky in remote meetings. The ideal solution is to use collaboration software with a whiteboard as a means of recording the follow-up actions and responsibilities. (A Word or Excel document viewed through NetMeeting works equally well.) But if the meeting is being conducted without collaboration software, the leader must review each follow-up action explicitly, even painstakingly. I generally note follow-up actions throughout the meeting and use the last few minutes to confirm and finalize. I read each action and name the person I think owns the responsibility. When the person accepts, I validate by asking for a completion date. All the normal rules for assigning follow-up actions apply, of course. One, and only one, person must be responsible for each action, and assigning an action to somebody not present is akin to assigning it to nobody.
Approximate reversibility in the context of entropy gain, information gain, and complete positivity
NASA Astrophysics Data System (ADS)
Buscemi, Francesco; Das, Siddhartha; Wilde, Mark M.
2016-06-01
There are several inequalities in physics which limit how well we can process physical systems to achieve some intended goal, including the second law of thermodynamics, entropy bounds in quantum information theory, and the uncertainty principle of quantum mechanics. Recent results provide physically meaningful enhancements of these limiting statements, determining how well one can attempt to reverse an irreversible process. In this paper, we apply and extend these results to give strong enhancements to several entropy inequalities, having to do with entropy gain, information gain, entropic disturbance, and complete positivity of open quantum systems dynamics. Our first result is a remainder term for the entropy gain of a quantum channel. This result implies that a small increase in entropy under the action of a subunital channel is a witness to the fact that the channel's adjoint can be used as a recovery map to undo the action of the original channel. We apply this result to pure-loss, quantum-limited amplifier, and phase-insensitive quantum Gaussian channels, showing how a quantum-limited amplifier can serve as a recovery from a pure-loss channel and vice versa. Our second result regards the information gain of a quantum measurement, both without and with quantum side information. We find here that a small information gain implies that it is possible to undo the action of the original measurement if it is efficient. The result also has operational ramifications for the information-theoretic tasks known as measurement compression without and with quantum side information. Our third result shows that the loss of Holevo information caused by the action of a noisy channel on an input ensemble of quantum states is small if and only if the noise can be approximately corrected on average. We finally establish that the reduced dynamics of a system-environment interaction are approximately completely positive and trace preserving if and only if the data processing inequality holds approximately.
25 CFR 62.10 - Action by the Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Secretary for final action together with any relevant information or records; the recommendations of the... to the Assistant Secretary for final action together with any relevant information or records; the... record as presented together with such additional information as may be considered pertinent. Any...
75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed within...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeremy Gwin and Douglas Frenette
This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values andmore » corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.« less
National policy on physical activity: the development of a policy audit tool.
Bull, Fiona C; Milton, Karen; Kahlmeier, Sonja
2014-02-01
Physical inactivity is a leading risk factor for noncommunicable disease worldwide. Increasing physical activity requires large scale actions and relevant, supportive national policy across multiple sectors. The policy audit tool (PAT) was developed to provide a standardized instrument to assess national policy approaches to physical activity. A draft tool, based on earlier work, was developed and pilot-tested in 7 countries. After several rounds of revisions, the final PAT comprises 27 items and collects information on 1) government structure, 2) development and content of identified key policies across multiple sectors, 3) the experience of policy implementation at both the national and local level, and 4) a summary of the PAT completion process. PAT provides a standardized instrument for assessing progress of national policy on physical activity. Engaging a diverse international group of countries in the development helped ensure PAT has applicability across a wide range of countries and contexts. Experiences from the development of the PAT suggests that undertaking an audit of health enhancing physical activity (HEPA) policy can stimulate greater awareness of current policy opportunities and gaps, promote critical debate across sectors, and provide a catalyst for collaboration on policy level actions. The final tool is available online.
A Biologically Inspired Computational Model of Basal Ganglia in Action Selection
Baston, Chiara
2015-01-01
The basal ganglia (BG) are a subcortical structure implicated in action selection. The aim of this work is to present a new cognitive neuroscience model of the BG, which aspires to represent a parsimonious balance between simplicity and completeness. The model includes the 3 main pathways operating in the BG circuitry, that is, the direct (Go), indirect (NoGo), and hyperdirect pathways. The main original aspects, compared with previous models, are the use of a two-term Hebb rule to train synapses in the striatum, based exclusively on neuronal activity changes caused by dopamine peaks or dips, and the role of the cholinergic interneurons (affected by dopamine themselves) during learning. Some examples are displayed, concerning a few paradigmatic cases: action selection in basal conditions, action selection in the presence of a strong conflict (where the role of the hyperdirect pathway emerges), synapse changes induced by phasic dopamine, and learning new actions based on a previous history of rewards and punishments. Finally, some simulations show model working in conditions of altered dopamine levels, to illustrate pathological cases (dopamine depletion in parkinsonian subjects or dopamine hypermedication). Due to its parsimonious approach, the model may represent a straightforward tool to analyze BG functionality in behavioral experiments. PMID:26640481
75 FR 23311 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... Rule 19d-1 (17 CFR 240.19d-1)--Notices by Self-Regulatory Organizations of Final Disciplinary Actions... agency concerning the following final SRO actions: (1) Disciplinary sanctions (including summary... Rule requires that such actions be promptly reported to the Commission. The Rule also requires that the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clayton, Christopher; Kothari, Vijendra; Starr, Ken
2012-02-26
The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collectionmore » adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.28 Section 8.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Summary Actions § 8.28 Final decision. Each exchange shall...
78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Administration (FHWA), Department of Transportation (DOT). ACTION: Notice of limitations on claims for judicial... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
75 FR 42 - Establishment of Class E Airspace; Spencer, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule; confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that establishes Class E Airspace at Spencer, WV. This action enhances the safety and airspace management of Boggs...
76 FR 51462 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Utah AGENCY: Federal Highway Administration (FHWA), USDOT. ACTION: Notice of... highway project, Tooele Midvalley Highway, from I-80 to State Route 36 Tooele County, State of Utah. Those...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 5 2014-07-01 2014-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 5 2010-07-01 2010-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 5 2012-07-01 2012-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 5 2011-07-01 2011-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 5 2013-07-01 2013-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
78 FR 30345 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... seeking Commission review of final disciplinary actions against them taken by self-regulatory... information provided in the application filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary sanctions; (2) denial or conditioning of membership, participation or...
Bicalho, R C; Santos, T M A; Gilbert, R O; Caixeta, L S; Teixeira, L M; Bicalho, M L S; Machado, V S
2010-01-01
The objective of this study was to isolate bacteriophages from environmental samples of 2 large commercial dairy farms using Escherichia coli isolated from the uteri of postpartum Holstein dairy cows as hosts. A total of 11 bacteriophage preparations were isolated from manure systems of commercial dairy farms and characterized for in vitro antimicrobial activity. In addition, a total of 57 E. coli uterine isolates from 5 dairy cows were phylogenetically grouped by triplex PCR. Each E. coli bacterial host from the uterus was inoculated with their respective bacteriophage preparation at several different multiplicities of infections (MOI) to determine minimum inhibitory MOI. The effect of a single dose (MOI=10(2)) of bacteriophage on the growth curve of all 57 E. coli isolates was assessed using a microplate technique. Furthermore, genetic diversity within and between the different bacteriophage preparations was assessed by bacteriophage purification followed by DNA extraction, restriction, and agarose gel electrophoresis. Phylogenetic grouping based on triplex PCR showed that all isolates of E. coli belonged to phylogroup B1. Bacterial growth was completely inhibited at considerably low MOI, and the effect of a single dose (MOI=10(2)) of bacteriophage preparations on the growth curve of all 57 E. coli isolates showed that all bacteriophage preparations significantly decreased the growth rate of the isolates. Bacteriophage preparation 1230-10 had the greatest antimicrobial activity and completely inhibited the growth of 71.7% (n=57) of the isolates. The combined action of bacteriophage preparations 1230-10, 6375-10, 2540-4, and 6547-2, each at MOI=10(2), had the broadest spectrum of action and completely inhibited the growth (final optical density at 600 nm
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
Development of a Unix/VME data acquisition system
NASA Astrophysics Data System (ADS)
Miller, M. C.; Ahern, S.; Clark, S. M.
1992-01-01
The current status of a Unix-based VME data acquisition development project is described. It is planned to use existing Fortran data collection software to drive the existing CAMAC electronics via a VME CAMAC branch driver card and associated Daresbury Unix driving software. The first usable Unix driver has been written and produces single-action CAMAC cycles from test software. The data acquisition code has been implemented in test mode under Unix with few problems and effort is now being directed toward finalizing calls to the CAMAC-driving software and ultimate evaluation of the complete system.
String inspired brane world cosmology.
Germani, Cristiano; Sopuerta, Carlos F
2002-06-10
We consider brane world scenarios including the leading correction to the Einstein-Hilbert action suggested by superstring theory, the Gauss-Bonnet term. We obtain and study the complete set of equations governing the cosmological dynamics. We find they have the same form as those in Randall-Sundrum scenarios but with time-varying four-dimensional gravitational and cosmological constants. By studying the bulk geometry we show that this variation is produced by bulk curvature terms parametrized by the mass of a black hole. Finally, we show there is a coupling between these curvature terms and matter that can be relevant for early universe cosmology.
77 FR 61654 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed State Route 11 and Otay Mesa East Land Port of Entry in the City and County of San Diego, State of California. These actions grant licenses, permits, and approvals for the project.
5 CFR 1201.126 - Final decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES Procedures for Original Jurisdiction Cases Special Counsel Disciplinary Actions § 1201.126 Final decisions. (a) In any action to discipline an employee, except as provided in paragraphs (b) or (c) of this... civil penalty not to exceed $1,100. 5 U.S.C. 1215(a)(3). (b) In any action in which the administrative...
Reframing school dropout as a public health issue.
Freudenberg, Nicholas; Ruglis, Jessica
2007-10-01
Good education predicts good health, and disparities in health and in educational achievement are closely linked. Despite these connections, public health professionals rarely make reducing the number of students who drop out of school a priority, although nearly one-third of all students in the United States and half of black, Latino, and American Indian students do not graduate from high school on time. In this article, we summarize knowledge on the health benefits of high school graduation and discuss the pathways by which graduating from high school contributes to good health. We examine strategies for reducing school dropout rates with a focus on interventions that improve school completion rates by improving students' health. Finally, we recommend actions health professionals can take to reframe the school dropout rate as a public health issue and to improve school completion rates in the United States.
Picazo, O; Rosenblatt, J S; Fernández-Guasti, A
2000-10-01
Injection of the serotonergic agonist, 8-hydroxy-2-(di-n-propylamino-tetralin (8-OH-DPAT) (0.5 mg/kg ip) produced a clear anxiolytic-like effect (as measured in the burying behavior test), after parturition, which remains until day 6 of lactation. Thereafter 8-OH-DPAT completely lacked action. In order to analyze whether lactation prevented the action of 8-OH-DPAT, dams were separated from their pups for five consecutive days. The blockade of the anxiolytic effect of 8-OH-DPAT does not disappear by isolation of the mothers from their offspring or from neighboring pups. Finally, to investigate the possible role of maternal behavior in the blockade of the anxiolytic effect of 8-OH-DPAT a third experiment was made in which ovariectomized females were rendered maternal by the sensitization procedure. These females respond normally to the antianxiety actions of 8-OH-DPAT. Results suggest that a long-term clue triggered by lactation, possibly related to prolactin secretion, interferes with the anxiolytic effect of 8-OH-DPAT.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-09-29
The Allied Chemical site is located in the City of Ironton, Lawrence County, Ohio. The remedial action addresses the Goldcamp Disposal Area (GDA) operable unit of the site. The GDA was a sand and gravel pit used for disposal of various chemical wastes from three sources between 1945 and 1977. In 1977, Allied decided to discontinue use of the GDA for disposal of chemical wastes. Allied and its contractor, in consultation with the Ohio Environmental Protection Agency (OEPA), completed a closure project at the site in August 1980, which involved removal of standing liquids and filling and capping the sitemore » with clay. Subsequent hydrogeologic and water-quality investigations indicated that there is ground-water contamination at the site which may pose a threat to public health through migration. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, other organics including phenols and PAHs, and inorganics including cyanide. The selected remedial action for the site is included.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-10
... (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the U.S. Army... notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim... claim is filed on or before October 7, 2013. If this date falls on a Saturday, Sunday, or legal holiday...
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2014 CFR
2014-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2012 CFR
2012-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
10 CFR 51.92 - Supplement to the final environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... changes in the proposed action that are relevant to environmental concerns; or (2) There are new and..., technical, and other benefits and costs of the proposed action, to the extent that the final environmental... costs; (5) Include an analysis of other energy alternatives, to the extent that the final environmental...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2011 CFR
2011-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2010 CFR
2010-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
78 FR 15757 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... disciplinary actions against them taken by self-regulatory organizations (``SROs'') for which the Commission is... filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
40 CFR 35.2216 - Notice of building completion and final inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Notice of building completion and final... Notice of building completion and final inspection. The grantee shall notify the Regional Administrator when the building of the project is complete. Final inspection shall be made by the Regional...
77 FR 54384 - Nonconformance Penalties for On-Highway Heavy-Duty Diesel Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
...EPA is taking final action to establish nonconformance penalties (NCPs) for manufacturers of heavy heavy-duty diesel engines (HHDDE) in model years 2012 and later for emissions of oxides of nitrogen (NOX) because we have found the criteria for NCPs and the Clean Air Act have been met. The NOX standards to which these NCPs apply were established by a rule published on January 18, 2001. In general, NCPs allow a manufacturer of heavy-duty engines (HDEs) whose engines do not conform to applicable emission standards, but do not exceed a designated upper limit, to be issued a certificate of conformity upon payment of a monetary penalty to the United States Government. The upper limit associated with these NCPs is 0.50 grams of NOX per brake horsepower-hour (g/bhp-hr). This Final Rule specifies certain parameters that are entered into the preexisting penalty formulas along with the emissions of the engine and the incorporation of other factors to determine the amount a manufacturer must pay. Key parameters that determine the NCP a manufacturer must pay are EPA's estimated cost of compliance for a near worst-case engine and the degree to which the engine exceeds the emission standard (as measured from production engines). EPA proposed NCPs for medium heavy duty diesel engines. However, EPA is not taking final action with regard to NCPs for these engines at this time because EPA has not completed its review of the data and comments regarding these engines.
75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
Code of Federal Regulations, 2010 CFR
2010-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
Code of Federal Regulations, 2011 CFR
2011-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews and Dawn Peterson
2011-09-01
Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less
2013 Cellulosic Biofuel Standard: Direct Final Rule
The direct final action is to revise the 2013 cellulosic biofuel standard. This action follows from EPA having granted API's and AFPM's petitions for reconsideration of the 2013 cellulosic biofuel standard published on August 15, 2013.
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
Rose, Kathryn V.; Nayegandhi, Amar; Moses, Christopher S.; Beavers, Rebecca; Lavoie, Dawn; Brock, John C.
2012-01-01
The National Park Service (NPS) Inventory and Monitoring (I&M) Program initiated a benthic habitat mapping program in ocean and coastal parks in 2008-2009 in alignment with the NPS Ocean Park Stewardship 2007-2008 Action Plan. With more than 80 ocean and Great Lakes parks encompassing approximately 2.5 million acres of submerged territory and approximately 12,000 miles of coastline (Curdts, 2011), this Servicewide Benthic Mapping Program (SBMP) is essential. This report presents an initial gap analysis of three pilot parks under the SBMP: Assateague Island National Seashore (ASIS), Channel Islands National Park (CHIS), and Sleeping Bear Dunes National Lakeshore (SLBE) (fig. 1). The recommended SBMP protocols include servicewide standards (for example, gap analysis, minimum accuracy, final products) as well as standards that can be adapted to fit network and park unit needs (for example, minimum mapping unit, mapping priorities). The SBMP requires the inventory and mapping of critical components of coastal and marine ecosystems: bathymetry, geoforms, surface geology, and biotic cover. In order for a park unit benthic inventory to be considered complete, maps of bathymetry and other key components must be combined into a final report (Moses and others, 2010). By this standard, none of the three pilot parks are mapped (inventoried) to completion with respect to submerged resources. After compiling the existing benthic datasets for these parks, this report has concluded that CHIS, with 49 percent of its submerged area mapped, has the most complete benthic inventory of the three. The ASIS submerged inventory is 41 percent complete, and SLBE is 17.5 percent complete.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
A Tangent Bundle Theory for Visual Curve Completion.
Ben-Yosef, Guy; Ben-Shahar, Ohad
2012-07-01
Visual curve completion is a fundamental perceptual mechanism that completes the missing parts (e.g., due to occlusion) between observed contour fragments. Previous research into the shape of completed curves has generally followed an "axiomatic" approach, where desired perceptual/geometrical properties are first defined as axioms, followed by mathematical investigation into curves that satisfy them. However, determining psychophysically such desired properties is difficult and researchers still debate what they should be in the first place. Instead, here we exploit the observation that curve completion is an early visual process to formalize the problem in the unit tangent bundle R(2) × S(1), which abstracts the primary visual cortex (V1) and facilitates exploration of basic principles from which perceptual properties are later derived rather than imposed. Exploring here the elementary principle of least action in V1, we show how the problem becomes one of finding minimum-length admissible curves in R(2) × S(1). We formalize the problem in variational terms, we analyze it theoretically, and we formulate practical algorithms for the reconstruction of these completed curves. We then explore their induced visual properties vis-à-vis popular perceptual axioms and show how our theory predicts many perceptual properties reported in the corresponding perceptual literature. Finally, we demonstrate a variety of curve completions and report comparisons to psychophysical data and other completion models.
Visual variability affects early verb learning.
Twomey, Katherine E; Lush, Lauren; Pearce, Ruth; Horst, Jessica S
2014-09-01
Research demonstrates that within-category visual variability facilitates noun learning; however, the effect of visual variability on verb learning is unknown. We habituated 24-month-old children to a novel verb paired with an animated star-shaped actor. Across multiple trials, children saw either a single action from an action category (identical actions condition, for example, travelling while repeatedly changing into a circle shape) or multiple actions from that action category (variable actions condition, for example, travelling while changing into a circle shape, then a square shape, then a triangle shape). Four test trials followed habituation. One paired the habituated verb with a new action from the habituated category (e.g., 'dacking' + pentagon shape) and one with a completely novel action (e.g., 'dacking' + leg movement). The others paired a new verb with a new same-category action (e.g., 'keefing' + pentagon shape), or a completely novel category action (e.g., 'keefing' + leg movement). Although all children discriminated novel verb/action pairs, children in the identical actions condition discriminated trials that included the completely novel verb, while children in the variable actions condition discriminated the out-of-category action. These data suggest that - as in noun learning - visual variability affects verb learning and children's ability to form action categories. © 2014 The British Psychological Society.
75 FR 65052 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans and other Federal agencies that are final within the meaning of 23 U.S.C...
78 FR 13746 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to...
75 FR 5168 - Notice of Final Federal Agency Action on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice... construction of an access-controlled, four-lane freeway on new right-of-way between the existing IL 6... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
40 CFR 63.1382 - Emission standards
Code of Federal Regulations, 2010 CFR
2010-07-01
... complete corrective actions in a timely manner according to the procedures in the operations, maintenance... or operator must initiate corrective action within 1 hour of an alarm from a bag leak detection system and complete corrective actions in a timely manner according to the procedures in the operations...
Topology of actions and homogeneous spaces
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kozlov, Konstantin L
2013-04-30
Topologization of a group of homeomorphisms and its action provide additional possibilities for studying the topological space, the group of homeomorphisms, and their interconnections. The subject of the paper is the use of the property of d-openness of an action (introduced by Ancel under the name of weak micro-transitivity) in the study of spaces with various forms of homogeneity. It is proved that a d-open action of a Cech-complete group is open. A characterization of Polish SLH spaces using d-openness is given, and it is established that any separable metrizable SLH space has an SLH completion that is a Polishmore » space. Furthermore, the completion is realized in coordination with the completion of the acting group with respect to the two-sided uniformity. A sufficient condition is given for extension of a d-open action to the completion of the space with respect to the maximal equiuniformity with preservation of d-openness. A result of van Mill is generalized, namely, it is proved that any homogeneous CDH metrizable compactum is the only G-compactification of the space of rational numbers for the action of some Polish group. Bibliography: 39 titles.« less
Development of a probabilistic PCB-bioaccumulation model for six fish species in the Hudson River
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stackelberg, K. von; Menzie, C.
1995-12-31
In 1984 the US Environmental Protection Agency (USEPA) completed a Feasibility Study on the Hudson River that investigated remedial alternatives and issued a Record of Decision (ROD) later that year. In December 1989 USEPA decided to reassess the No Action decision for Hudson River sediments. This reassessment consists of three phases: Interim Characterization and Evaluation (Phase 1); Further Site Characterization and Analysis (Phase 2); and, Feasibility study (Phase 3). A Phase 1 report was completed in August, 1991. The team then completed a Final Work Plan for Phase 2 in September 1992. This work plan identified various PCB fate andmore » transport modeling activities to support the Hudson River PCB Reassessment Remedial Investigation and Feasibility Study (RI/FS). This talk provides a description of the development of a Probabilistic bioaccumulation models to describe the uptake of PCBs on a congener-specific basis in six fish species. The authors have developed a framework for relating body burdens of PCBs in fish to exposure concentrations in Hudson River water and sediments. This framework is used to understand historical and current relationships as well as to predict fish body burdens for future conditions under specific remediation and no action scenarios. The framework incorporates a probabilistic approach to predict distributions in PCB body burdens for selected fish species. These models can predict single population statistics such as the average expected values of PCBs under specific scenarios as well as the distribution of expected concentrations.« less
Federal Research Action Plan on Recycled Tire Crumb Used ...
Over the past several years, parents, athletes, schools, and communities have raised concerns about the safety of recycled tire crumb rubber used as infill for playing fields and playgrounds in the United States. The public has expressed concerns that the use of these fields could potentially be related to certain health effects. Studies to date have not shown an elevated health risk from playing on fields with tire crumb rubber, but these studies have limitations and do not comprehensively evaluate the concerns about health risks from exposure to tire crumb rubber. This status report provides a summary of activities to date, including: (1) stakeholder outreach, (2) the tire crumb rubber manufacturing industry, (3) the final peer-reviewed Literature Review/Gaps Analysis (LRGA), (4) progress on the research activities, and (5) next steps and a timeline for completion of the final report. The status report does not include research findings.
78 FR 70415 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
...Completing the first initiative of NHTSA's 2007 ``NHTSA's Approach to Motorcoach Safety'' plan and one of the principal undertakings of DOT's 2009 Motorcoach Safety Action Plan, and fulfilling a statutory mandate of the Motorcoach Enhanced Safety Act of 2012, incorporated into the Moving Ahead for Progress in the 21st Century Act, this final rule amends the Federal motor vehicle safety standard (FMVSS) on occupant crash protection to require lap/shoulder seat belts for each passenger seating position in all new over-the-road buses, and in new buses other than over-the-road buses with a gross vehicle weight rating (GVWR) greater than 11,793 kilograms (kg) (26,000 pounds (lb), with certain exclusions. By requiring the passenger lap/ shoulder seat belts, this final rule significantly reduces the risk of fatality and serious injury in frontal crashes and the risk of occupant ejection in rollovers, thus considerably enhancing the safety of these vehicles.
Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walton, L.
1995-01-01
The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and tomore » plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project.« less
[Spatial imprinting influence on development of cognitive process in adult animals].
Serkova, V V; Nikol'skaia, K A
2013-12-01
The influence of spatial imprinting on cognitive activity of adult mice F1 from DBA/2J C57BL/6J in a transformable multialternative maze has been studied. A control mice initially learned in a maze with "direct" and "bypass" pathway between feeders. They successfully formed a food-getting habit after 9-10 sessions using mainly direct pathway, so the final route decision was consistent with the principle of least action. Experimental mice previously placed into reduced maze with only "bypass" pathway between feeders for 1-2 trials (1-3 min), and turn up in the complete maze immediately after that. Experimental mice could not organize a food-getting behavior according a task conditions since attempted to include in final decision both "direct" and "bypass" pathways, united in a single ring-like construction. They demonstrated situational behavior running from one feeder to another one, despite of fact that therein had no feed. So it opposed the realization of least action principle, becoming a source of psycho-emotional stress. The results showed that spatial information perceiving in the first few minutes of exploring the experimental environment can manifest itself as the acquired preference and come in conflict with an instinctive one. Cognitive dissonance predetermined the direction of the cognitive process.
Additional Technologies and Investigations for Provision of Future Aeronautical Communications
NASA Technical Reports Server (NTRS)
Gilbert, Tricia; Jin, Jenny; Berger, Jason; Henriksen, Steve
2008-01-01
The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.
75 FR 78340 - Notice of Final Federal Agency Actions on Proposed Highway in Nevada
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to I-15 Corridor... NEON, in Clark County in the State of Nevada. Those actions grant licenses, permits, and approvals for...; telephone: (775) 888-7686; e-mail: [email protected]state.nv.us . The NDOT office's regular business hours are 8 a...
Can medical students recognize depression? A survey at the Zagreb School of Medicine.
Kuzman, Martina Rojnic; Bosnjak, Dina; Vokal, Petra; Kuharic, Josip; Brkic, Ivana; Kuzman, Tomislav; Dujmovic, Josip
2014-06-01
The objective of this study was to investigate medical students' knowledge and attitudes towards depression. Students attending their final year at Zagreb School of Medicine completed a set of standardized questionnaires, including attitudes towards psychiatric medication, attitudes towards depression, and personality inventory. In total, 199 students completed the questionnaire (response rate 77 %). Most medical students were only partially able to correctly identify major symptoms of depression, but did suggest referral to mental health specialists as the most appropriate course of action. They recognized social and biological causes of depression. Degree of correct identification of symptoms of depression correlated positively with non-stigmatizing attitudes towards depression and negatively with stigmatizing attitudes towards depression. Students' attitudes toward depression may influence their recognition of symptoms of depression. Incorporation of these findings in development of undergraduate medical curricula may improve students' recognition of depression.
Dana, M N; Ascher, P D
1986-01-01
A previously identified S-linked stylar-inactivation PSC factor (Flaschenriem and Ascher 1979b) was studied for its location relative to S. Plants exhibiting complete stylar-inactivation PSC were those with higher multigenic PSC background level than plants with only S-linked partial stylar-inactivation PSC. A pollen-mediated pseudo-self compatibility (PMPSC) adjustment factor was offered as a device to focus on stylar-inactivation PSC by removing some male origin, multigenic PSC. The stylar inactivation factor was not tightly linked to S but affected expression of only the allele to which it was linked. A three part interacting association of genetic material governing self incompatibility (SI) is proposed. The parts of S are the SI identity gene, S-specific PSC genes and, finally, PSC genes which are not S-specific in action. The complete association is termed the SI-complex.
Effects of short-term quetiapine treatment on emotional processing, sleep and circadian rhythms.
Rock, Philippa L; Goodwin, Guy M; Wulff, Katharina; McTavish, Sarah F B; Harmer, Catherine J
2016-03-01
Quetiapine is an atypical antipsychotic that can stabilise mood from any index episode of bipolar disorder. This study investigated the effects of seven-day quetiapine administration on sleep, circadian rhythms and emotional processing in healthy volunteers. Twenty healthy volunteers received 150 mg quetiapine XL for seven nights and 20 matched controls received placebo. Sleep-wake actigraphy was completed for one week both pre-dose and during drug treatment. On Day 8, participants completed emotional processing tasks. Actigraphy revealed that quetiapine treatment increased sleep duration and efficiency, delayed final wake time and had a tendency to reduce within-day variability. There were no effects of quetiapine on subjective ratings of mood or energy. Quetiapine-treated participants showed diminished bias towards positive words and away from negative words during recognition memory. Quetiapine did not significantly affect facial expression recognition, emotional word categorisation, emotion-potentiated startle or emotional word/faces dot-probe vigilance reaction times. These changes in sleep timing and circadian rhythmicity in healthy volunteers may be relevant to quetiapine's therapeutic actions. Effects on emotional processing did not emulate the effects of antidepressants. The effects of quetiapine on sleep and circadian rhythms in patients with bipolar disorder merit further investigation to elucidate its mechanisms of action. © The Author(s) 2016.
Malet, C; Jiménez-Barbero, J; Bernabé, M; Brosa, C; Planas, A
1993-01-01
The stereochemical course of the reaction catalysed by endo-1,3-1,4-beta-D-glucan 4-glucanohydrolase (EC 3.2.1.73) has been determined by 1H n.m.r. The enzyme-catalysed hydrolysis of barley beta-glucan proceeds with overall retention of the anomeric configuration, indicating that the enzyme operates through a double-displacement mechanism. The structures of the final oligosaccharide products, 3-beta-O-cellobiosyl D-glucopyranoside and 3-beta-O-cellotriosyl D-glucopyranoside, have been completely assigned by 1H- and 13C-n.m.r. spectroscopy. PMID:8280073
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
... which such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the project, both approved on May 26, 2011. The FEA can be viewed...
Improving the treatment planning and delivery process of Xoft electronic skin brachytherapy.
Manger, Ryan; Rahn, Douglas; Hoisak, Jeremy; Dragojević, Irena
2018-05-14
To develop an improved Xoft electronic skin brachytherapy process and identify areas of further improvement. A multidisciplinary team conducted a failure modes and effects analysis (FMEA) by developing a process map and a corresponding list of failure modes. The failure modes were scored for their occurrence, severity, and detectability, and a risk priority number (RPN) was calculated for each failure mode as the product of occurrence, severity, and detectability. Corrective actions were implemented to address the higher risk failure modes, and a revised process was generated. The RPNs of the failure modes were compared between the initial process and final process to assess the perceived benefits of the corrective actions. The final treatment process consists of 100 steps and 114 failure modes. The FMEA took approximately 20 person-hours (one physician, three physicists, and two therapists) to complete. The 10 most dangerous failure modes had RPNs ranging from 336 to 630. Corrective actions were effective at addressing most failure modes (10 riskiest RPNs ranging from 189 to 310), yet the RPNs were higher than those published for alternative systems. Many of these high-risk failure modes remained due to hardware design limitations. FMEA helps guide process improvement efforts by emphasizing the riskiest steps. Significant risks are apparent when using a Xoft treatment unit for skin brachytherapy due to hardware limitations such as the lack of several interlocks, a short source lifespan, and variability in source output. The process presented in this article is expected to reduce but not eliminate these risks. Copyright © 2018 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.
Winters, Eric R; Petosa, Rick L; Charlton, Thomas E
2003-06-01
To examine whether knowledge of high school students' actions of self-regulation, and perceptions of self-efficacy to overcome exercise barriers, social situation, and outcome expectation will predict non-school related moderate and vigorous physical exercise. High school students enrolled in introductory Physical Education courses completed questionnaires that targeted selected Social Cognitive Theory variables. They also self-reported their typical "leisure-time" exercise participation using a standardized questionnaire. Bivariate correlation statistic and hierarchical regression were conducted on reports of moderate and vigorous exercise frequency. Each predictor variable was significantly associated with measures of moderate and vigorous exercise frequency. All predictor variables were significant in the final regression model used to explain vigorous exercise. After controlling for the effects of gender, the psychosocial variables explained 29% of variance in vigorous exercise frequency. Three of four predictor variables were significant in the final regression equation used to explain moderate exercise. The final regression equation accounted for 11% of variance in moderate exercise frequency. Professionals who attempt to increase the prevalence of physical exercise through educational methods should focus on the psychosocial variables utilized in this study.
Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. P. Floerke
Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idahomore » State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.« less
Van der Mispel, Celien; Poppe, Louise; Crombez, Geert; Verloigne, Maïté; De Bourdeaudhuij, Ilse
2017-07-11
eHealth interventions can reach large populations and are effective in increasing physical activity (PA) and fruit and vegetable intake. Nevertheless, the effects of eHealth interventions are overshadowed by high attrition rates. Examining more closely when users decide to leave the intervention can help eHealth developers to make informed decisions about which intervention components should be reshaped or simply removed. Investigating which users are more likely to quit an intervention can inform developers about whether and how their intervention should be adapted to specific subgroups of users. This study investigated the pattern of attrition in a Web-based intervention to increase PA, fruit, and vegetable intake. The first aim was to describe attrition rates according to different self-regulation components. A second aim was to investigate whether certain user characteristics are predictors for start session completion, returning to a follow-up session and intervention completion. The sample consisted of 549 adults who participated in an online intervention, based on self-regulation theory, to promote PA and fruit and vegetable intake, called "MyPlan 1.0." Using descriptive analysis, attrition was explored per self-regulation component (eg, action planning and coping planning). To identify which user characteristics predict completion, logistic regression analyses were conducted. At the end of the intervention program, there was an attrition rate of 78.2% (330/422). Attrition rates were very similar for the different self-regulation components. However, attrition levels were higher for the fulfillment of questionnaires (eg, to generate tailored feedback) than for the more interactive components. The highest amount of attrition could be observed when people were asked to make their own action plan. There were no significant predictors for first session completion. Yet, two subgroups had a lower chance to complete the intervention, namely male users (OR: 2.24, 95% CI=1.23-4.08) and younger adults (OR: 1.02, 95% CI=1.00-1.04). Furthermore, younger adults were less likely to return to the website for the first follow-up after one week (OR: 1.03, 95% CI=1.01-1.04). This study informs us that eHealth interventions should avoid the use of extensive questionnaires and that users should be provided with a rationale for several components (eg, making an action plan and completing questions). Furthermore, future interventions should focus first on motivating users for the behavior change before guiding them through action planning. Though, this study provides no evidence for removal of one of the self-regulation techniques based on attrition rates. Finally, strong efforts are needed to motivate male users and younger adults to complete eHealth interventions. ©Celien Van der Mispel, Louise Poppe, Geert Crombez, Maïté Verloigne, Ilse De Bourdeaudhuij. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 11.07.2017.
Sonderer, Patrizia; Akhbari Ziegler, Schirin; Gressbach Oertle, Barbara; Meichtry, André; Hadders-Algra, Mijna
2017-07-01
Pediatric physical therapy (PPT) is characterized by heterogeneity. This blurs the evaluation of effective components of PPT. The Groningen Observation Protocol (GOP) was developed to quantify contents of PPT. This study assesses the reliability and completeness of the GOP. Sixty infant PPT sessions were video-taped. Two random samples of 10 videos were used to determine interrater and intrarater reliability using interclass correlation coefficients (ICCs) with 95% confidence intervals. Completeness of GOP 2.0 was based on 60 videos. Interrater reliability of quantifying PPT actions was excellent (ICC, 0.75-1.0) in 71% and sufficient to good (ICC, 0.4-0.74) in 24% of PPT actions. Intrarater reliability was excellent in 94% and sufficient to good in 6% of PPT actions. Completeness was good for greater than 90% of PPT actions. GOP 2.0 has good reliability and completeness. After appropriate training, it is a useful tool to quantify PPT for children with developmental disorders.
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
Establishing Final Cleanup Decisions for the Hanford Site River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Sands, J.P.
2007-07-01
A major challenge in the River Corridor Closure Contract is establishing final cleanup decisions for the source operable units in the Hanford Site river corridor. Cleanup actions in the river corridor began in 1994 and have been performed in accordance with a 'bias for action' approach adopted by the Tri-Parties - the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology. This approach enabled early application of cleanup dollars on actual remediation of contaminated waste sites. Consequently, the regulatory framework authorizing cleanup actions at source operable units in the river corridor consists largely of interimmore » action records of decision, which were supported by qualitative risk assessments. Obtaining final cleanup decisions for the source operable units is necessary to determine whether past cleanup actions in the river corridor are protective of human health and the environment and to identify any course corrections that may be needed to ensure that ongoing and future cleanup actions are protective. Because the cleanup actions are ongoing, it is desirable to establish the final cleanup decisions as early as possible to minimize the impacts of any identified course corrections to the present cleanup approach. Development of a strategy to obtain final cleanup decisions for the source operable units in a manner that is responsive to desires for an integrated approach with the groundwater and Columbia River components while maintaining the ability to evaluate each component on its own merit represents a significant challenge. There are many different options for grouping final cleanup decisions, and each involved party or stakeholder brings slightly different interests that shape the approach. Regardless of the selected approach, there are several specific challenges and issues to be addressed before making final cleanup decisions. A multi-agency and contractor working group has been established to address these issues and develop an endorsed strategy. Ultimately, it is anticipated that the Tri-Parties will establish a set of milestones to document pathway selection and define schedule requirements. (authors)« less
77 FR 40812 - Dicloran and Formetanate; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... Dicloran and Formetanate; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final... I.C. of the SUPPLEMENTARY INFORMATION). ADDRESSES: The docket for this action, identified by [email protected] . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may...
76 FR 64022 - Hydrogen Sulfide; Community Right-to-Know Toxic Chemical Release Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
...EPA is announcing that it is lifting the Administrative Stay of the Emergency Planning and Community Right-to-Know Act (EPCRA) section 313 toxic chemical release reporting requirements for hydrogen sulfide (Chemical Abstracts Service Number (CAS No.) 7783-06-4). Hydrogen sulfide was added to the EPCRA section 313 list of toxic chemicals in a final rule published in the Federal Register on December 1, 1993. However, on August 22, 1994, EPA issued an Administrative Stay of the reporting requirements for hydrogen sulfide in order to evaluate issues brought to the Agency's attention after promulgation of the final rule concerning the human health effect basis for the listing and the Agency's use of exposure analysis in EPCRA section 313 listing decisions. Although the final rule listing hydrogen sulfide under section 313 of EPCRA remained in force, the stay deferred the reporting requirements for hydrogen sulfide while EPA completed this further evaluation. EPA completed its further evaluation of additional information that has become available since the stay was put in place regarding the human health and environmental effects of hydrogen sulfide, and the Agency published a position that the stay should be lifted in the February 26, 2010, Federal Register document ``Intent to Consider Lifting Administrative Stay; Opportunity for Public Comment.'' Based on EPA's further evaluation and the consideration of the public comments received on the notice of intent, EPA continues to believe that the Administrative Stay should be lifted. By this current action, EPA is not revisiting the original listing decision, which was accomplished by final rule on December 1, 1993. Rather, EPA is lifting the Administrative Stay of the reporting requirements for hydrogen sulfide.
Action theory within the structural view.
Rangell, L
1989-01-01
This paper presents a summary of a cohesive theme coursing through a group of selected papers written by the author over four decades. Purpose, intention, choice and decision are seen as firmly anchored within structural metapsychological theory. These constitute a cohesive and operative psychoanalytic theory of action, which Hartmann stated did not exist within psychoanalytic theory. The exposure and inclusion of this unconscious series of intrapsychic events obviates the need for many alternative theories which have been erected to give a place to these very functions. Unconscious decision, ego will and volition, the unconscious initiation and execution of action, operate during waking life, with as complete and complex secondary process mentation as secondary revision organizes the final shape and contents of a dream during sleep. These conceptual changes and advances have important psychosociolegal implications. Man not only does not know why he acts; he also does not always know that he acts. The mainstream itself is not monolithic and has also resisted the development of many of these advances. Factors responsible for this lag or block are adduced, which include anti-scientism or intellectuality, as well as, most importantly, a resistance to an increase of responsibility and accountability.
Citrate and renal calculi: an update
NASA Technical Reports Server (NTRS)
Pak, C. Y.
1994-01-01
Citrate is an inhibitor of the crystallization of stone-forming calcium salts. Hypocitraturia, frequently encountered in patients with nephrolithiasis, is therefore an important risk factor for stone formation. Potassium citrate provides physiological and physicochemical correction and inhibits new stone formation, not only in hypocitraturic calcium nephrolithiasis but also in uric acid nephrolithiasis. Inhibition of stone recurrence has now been validated by a randomized trial. Ongoing research has disclosed additional causes of hypocitraturia (sodium excess, low intestinal alkali absorption, but not primary citrate malabsorption). Moreover, new insights on potassium citrate action have been shown, notably that some of absorbed citrate escapes oxidation and contributes to the citraturic response, that ingestion with a meal does not sacrifice physiological or physicochemical action, that orange juice mimics but does not completely duplicate its actions, that potassium citrate may have a beneficial bone-sparing effect, that it may reduce stone fragments following ESWL, and that danger of aluminum toxicity is not great in subjects with functioning kidneys. Finally, the research on potassium citrate has led to two promising products, calcium citrate as an optimum calcium supplement and potassium-magnesium citrate which may be superior to potassium citrate in the management of stone disease.
75 FR 43 - Modification of Class E Airspace; Beckley, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... and management of the aircraft operations at Raleigh County Memorial Airport. DATES: Effective 0901... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that...
75 FR 43 - Modification of Class E Airspace; Sarasota, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that... increases the safety and management of the aircraft operations at Sarasota/Bradenton International Airport...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Rate dependency of delayed rectifier currents during the guinea-pig ventricular action potential
Rocchetti, Marcella; Besana, Alessandra; Gurrola, Georgina B; Possani, Lourival D; Zaza, Antonio
2001-01-01
The action potential clamp technique was exploited to evaluate the rate dependency of delayed rectifier currents (IKr and IKs) during physiological electrical activity. IKr and IKs were measured in guinea-pig ventricular myocytes at pacing cycle lengths (CL) of 1000 and 250 ms.A shorter CL, with the attendant changes in action potential shape, was associated with earlier activation and increased magnitude of both IKr and IKs. Nonetheless, the relative contributions of IKr and IKs to total transmembrane current were independent of CL.Shortening of diastolic interval only (constant action potential shape) enhanced IKs, but not IKr.IKr was increased by a change in the action potential shape only (constant diastolic interval).In ramp clamp experiments, IKr amplitude was directly proportional to repolarization rate at values within the low physiological range (< 1.0 V s−1); at higher repolarization rates proportionality became shallower and finally reversed.When action potential duration (APD) was modulated by constant current injection (I-clamp), repolarization rates > 1.0 V s−1 were associated with a reduced effect of IKr block on APD. The effect of changes in repolarization rate was independent of CL and occurred in the presence of IKs blockade.In spite of its complexity, the behaviour of IKr was accurately predicted by a numerical model based entirely on known kinetic properties of the current.Both IKr and IKs may be increased at fast heart rates, but this may occur through completely different mechanisms. The mechanisms identified are such as to contribute to abnormal rate dependency of repolarization in prolonged repolarization syndromes. PMID:11483703
76 FR 40811 - Maneb; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
...; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is... established a docket for this action under docket identification (ID) number EPA-HQ-OPP-2010-0327. All... . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may be potentially...
77 FR 47513 - Definition of Enforcement Action
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... Enforcement Action AGENCY: National Indian Gaming Commission, Interior. ACTION: Final rule. SUMMARY: The... to add a definition of ``enforcement action.'' DATES: Effective Date: September 10, 2012. FOR FURTHER... that to supplement the amendments made to Part 573, a definition of ``enforcement action'' needed to be...
NASA Astrophysics Data System (ADS)
Cardona, Javier Fernando; García Bonilla, Alba Carolina; Tomás García, Rogelio
2017-11-01
This article shows that the effect of all quadrupole errors present in an interaction region with low β * can be modeled by an equivalent magnetic kick, which can be estimated from action and phase jumps found on beam position data. This equivalent kick is used to find the strengths that certain normal and skew quadrupoles located on the IR must have to make an effective correction in that region. Additionally, averaging techniques to reduce noise on beam position data, which allows precise estimates of equivalent kicks, are presented and mathematically justified. The complete procedure is tested with simulated data obtained from madx and 2015-LHC experimental data. The analyses performed in the experimental data indicate that the strengths of the IR skew quadrupole correctors and normal quadrupole correctors can be estimated within a 10% uncertainty. Finally, the effect of IR corrections in the β* is studied, and a correction scheme that returns this parameter to its designed value is proposed.
A consensus action agenda for achieving the national health information infrastructure.
Yasnoff, William A; Humphreys, Betsy L; Overhage, J Marc; Detmer, Don E; Brennan, Patricia Flatley; Morris, Richard W; Middleton, Blackford; Bates, David W; Fanning, John P
2004-01-01
Improving the safety, quality, and efficiency of health care will require immediate and ubiquitous access to complete patient information and decision support provided through a National Health Information Infrastructure (NHII). To help define the action steps needed to achieve an NHII, the U.S. Department of Health and Human Services sponsored a national consensus conference in July 2003. Attendees favored a public-private coordination group to guide NHII activities, provide education, share resources, and monitor relevant metrics to mark progress. They identified financial incentives, health information standards, and overcoming a few important legal obstacles as key NHII enablers. Community and regional implementation projects, including consumer access to a personal health record, were seen as necessary to demonstrate comprehensive functional systems that can serve as models for the entire nation. Finally, the participants identified the need for increased funding for research on the impact of health information technology on patient safety and quality of care. Individuals, organizations, and federal agencies are using these consensus recommendations to guide NHII efforts.
A Process Algebraic Approach to Software Architecture Design
NASA Astrophysics Data System (ADS)
Aldini, Alessandro; Bernardo, Marco; Corradini, Flavio
Process algebra is a formal tool for the specification and the verification of concurrent and distributed systems. It supports compositional modeling through a set of operators able to express concepts like sequential composition, alternative composition, and parallel composition of action-based descriptions. It also supports mathematical reasoning via a two-level semantics, which formalizes the behavior of a description by means of an abstract machine obtained from the application of structural operational rules and then introduces behavioral equivalences able to relate descriptions that are syntactically different. In this chapter, we present the typical behavioral operators and operational semantic rules for a process calculus in which no notion of time, probability, or priority is associated with actions. Then, we discuss the three most studied approaches to the definition of behavioral equivalences - bisimulation, testing, and trace - and we illustrate their congruence properties, sound and complete axiomatizations, modal logic characterizations, and verification algorithms. Finally, we show how these behavioral equivalences and some of their variants are related to each other on the basis of their discriminating power.
EPA is taking direct final action to approve a request from the state of North Carolina for the EPA to relax the Reid Vapor Pressure standard applicable to gasoline introduced into commerce in the summer time for Mecklenburg and Gaston counties.
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... suspend the payment of all or some of the civil penalty, conditioned on the violator's future compliance...
The EPA is taking final action to relax the federal volatility (RVP) standard applicable to gasoline supplied to the Birmingham area from 7.8 pounds per square inch (psi) to 9.0 psi during the summer ozone season.
76 FR 1999 - Establishment of Class E Airspace; Panguitch, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-12
... Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action will establish Class E... the safety and management of Instrument Flight Rules (IFR) operations at the airport. DATES: Effective... found merit in this comment, and will incorporate this change in the final rule. With the exception of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF MILITARY RECORDS OF THE COAST GUARD Judgment and Disposition § 52.64 Final action. (a) The Board.... 1552, as follows: (1) The Board may deny an application for the correction of military records. (2... for the correction of military records in any of the following categories: (i) An application to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... 2150-2162 and 2500-2690 MHz Bands AGENCY: Federal Communications Commission. ACTION: Final rule..., demonstrate substantial service by combining licenses. Finally, on its own motion, the Commission corrects a... actions clarify the requirements necessary for BRS and EBS licensees to demonstrate substantial service...
78 FR 48161 - Proposed Consent Decree, Clean Air Act Citizen Suit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... further alleged that EPA had failed to take final action on the attainment demonstration, contingency... a notice taking final action on the attainment demonstration, contingency measures, emission....gov . You may use the www.regulations.gov to submit or view public comments, access the index listing...
Not so secret agents: Event-related potentials to semantic roles in visual event comprehension.
Cohn, Neil; Paczynski, Martin; Kutas, Marta
2017-12-01
Research across domains has suggested that agents, the doers of actions, have a processing advantage over patients, the receivers of actions. We hypothesized that agents as "event builders" for discrete actions (e.g., throwing a ball, punching) build on cues embedded in their preparatory postures (e.g., reaching back an arm to throw or punch) that lead to (predictable) culminating actions, and that these cues afford frontloading of event structure processing. To test this hypothesis, we compared event-related brain potentials (ERPs) to averbal comic panels depicting preparatory agents (ex. reaching back an arm to punch) that cued specific actions with those to non-preparatory agents (ex. arm to the side) and patients that did not cue any specific actions. We also compared subsequent completed action panels (ex. agent punching patient) across conditions, where we expected an inverse pattern of ERPs indexing the differential costs of processing completed actions asa function of preparatory cues. Preparatory agents evoked a greater frontal positivity (600-900ms) relative to non-preparatory agents and patients, while subsequent completed actions panels following non-preparatory agents elicited a smaller frontal positivity (600-900ms). These results suggest that preparatory (vs. non-) postures may differentially impact the processing of agents and subsequent actions in real time. Copyright © 2017 Elsevier Inc. All rights reserved.
The dynamic range of response set activation during action sequencing.
Behmer, Lawrence P; Crump, Matthew J C
2017-03-01
We show that theories of response scheduling for sequential action can be discriminated on the basis of their predictions for the dynamic range of response set activation during sequencing, which refers to the momentary span of activation states for completed and to-be-completed actions in a response set. In particular, theories allow that future actions in a plan are partially activated, but differ with respect to the width of the range, which refers to the number of future actions that are partially activated. Similarly, theories differ on the width of the range for recently completed actions that are assumed to be rapidly deactivated or gradually deactivated in a passive fashion. We validate a new typing task for measuring momentary activation states of actions across a response set during action sequencing. Typists recruited from Amazon Mechanical Turk copied a paragraph by responding to a "go" signal that usually cued the next letter but sometimes cued a near-past or future letter (n-3, -2, -1, 0, +2, +3). The activation states for producing letters across go-signal positions can be inferred from RTs and errors. In general, we found evidence of graded parallel activation for future actions and rapid deactivation of more distal past actions. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
The radiology digital dashboard: effects on report turnaround time.
Morgan, Matthew B; Branstetter, Barton F; Lionetti, David M; Richardson, Jeremy S; Chang, Paul J
2008-03-01
As radiology departments transition to near-complete digital information management, work flows and their supporting informatics infrastructure are becoming increasingly complex. Digital dashboards can integrate separate computerized information systems and summarize key work flow metrics in real time to facilitate informed decision making. A PACS-integrated digital dashboard function designed to alert radiologists to their unsigned report queue status, coupled with an actionable link to the report signing application, resulted in a 24% reduction in the time between transcription and report finalization. The dashboard was well received by radiologists who reported high usage for signing reports. Further research is needed to identify and evaluate other potentially useful work flow metrics for inclusion in a radiology clinical dashboard.
2007-12-05
This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
75 FR 58016 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No... project records. The FEA, and other project records are available by contacting the California Department of Transportation at the address provided above. The FEA can be viewed and downloaded from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l... Conservation and Management Act of 1976, as amended [16 U.S.C. 1801 et seq.]; Bald and Golden Eagle Protection...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Department of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is taking final action to approve North Dakota Department of Agriculture's... Department of Agriculture (iv) The initials RMP mean Risk Management Plan (v) The initials CFR mean Code of...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2012 CFR
2012-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2013 CFR
2013-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2010 CFR
2010-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2010 CFR
2010-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2011 CFR
2011-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2011 CFR
2011-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2012 CFR
2012-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2013 CFR
2013-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
Federal Registers and fact sheets about EPA taking final action to approve a request from the state of Alabama for the EPA to relax the Reid Vapor Pressure standard applicable to gasoline introduced into commerce in the summer time are here.
18 CFR 401.90 - Appeals from final Commission action; Time for appeals.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Appeals from final Commission action; Time for appeals. 401.90 Section 401.90 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Administrative and Other...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway and Bridge in the Cities of Cincinnati, Ohio, and Covington, Kentucky AGENCY..., including interchanges and a new bridge over the Ohio River in the City of Cincinnati, Hamilton County...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...
78 FR 44307 - Semiannual Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... Service--Completed Actions Regulation Sequence No. Title Identifier No. 233 Indoor Tanning Services; 1545... TREASURY (TREAS) Internal Revenue Service (IRS) Completed Actions 233. Indoor Tanning Services; Cosmetic...: Proposed regulations provide guidance on the indoor tanning services tax made by the Patient Protection and...
32 CFR 536.144 - Reopening a claim after final action by a Foreign Claims Commission.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and if appropriate, a supplemental payment made. The basis for a change in action will be stated in a... representative, will reopen action on that claim and, if the belief is substantiated, correct the action. The...
Multi-criteria evaluation methods in the production scheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.
2016-08-01
The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.
Verspreet, Joran; Hemdane, Sami; Dornez, Emmie; Cuyvers, Sven; Delcour, Jan A; Courtin, Christophe M
2013-02-13
The degradation of endogenous wheat grain fructans, oligosaccharides with possible health-promoting potential, during wheat whole meal bread making was investigated, and several strategies to prevent their degradation were evaluated. Up to 78.4 ± 5.2% of the fructans initially present in wheat whole meal were degraded during bread making by the action of yeast ( Saccharomyces cerevisiae ) invertase. The addition of sucrose to dough delayed fructan degradation but had no effect on final fructan concentrations. However, yeast growth conditions and yeast genotype did have a clear impact. A 3-fold reduction of fructan degradation could be achieved when the commercial bread yeast strain was replaced by yeast strains with lower sucrose degradation activity. Finally, fructan degradation during bread making could be prevented completely by the use of a yeast strain lacking invertase. These results show that the nutritional profile of bread can be enhanced through appropriate yeast technology.
Student nurses' experiences of using a learning contract as a method of assessment.
Bailey, Maria E; Tuohy, Dympna
2009-10-01
The purpose of this study was to describe final year undergraduate nurses' experiences of assessment through the use of a learning contract. Using a qualitative descriptive design, data was collected from a purposive sample of final (fourth) year undergraduate student nurses. Two approaches were taken for data collection, anonymous evaluative questionnaires and interviews. The study was approved by the local university research and ethics committee. Data was thematically analysed. This article presents and discusses the findings from the interviews. Findings suggest that students' approach to the assessment strategy influenced engagement with the learning contract. Three themes were identified: skills, perceptions, and actions. Within these themes three types of learner were identified: happy, pragmatic and fearful. Factors found to influence successful completion of the learning contract were: support, relevant skills, prior experiential learning and required theoretical knowledge. Recommendations include the need for educators to consider module assessments that recognise the learning needs and preferences of the student within a supportive environment.
78 FR 30344 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... agency concerning the following final SRO actions: (1) Disciplinary actions with respect to any person... actions be promptly reported to the Commission. The Rule also requires that the reports and notices supply...
Base Realignment and Closure (BRAC) Cleanup Plan
1995-01-01
remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy
78 FR 1594 - Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... Ocean Energy Management--Completed Actions Regulation Sequence No. Title Identifier No. 328 Revised Requirements for 1010-AD61 Well Plugging and Platform Decommissioning. Office of Surface Mining Reclamation and... DEPARTMENT OF THE INTERIOR (DOI) Bureau of Ocean Energy Management (BOEM) Completed Actions 328. Revised...
Army Base Realignment Methodology. Volume II.
1981-08-01
deficien- cies because they were reconstructed after the fact. c. The Craig action was very similar to the Fort Wolters closure. It was completed ...7 / provided cross-checks on the Fort Wolters After Action Report and substantiated the completion of equipment shipments and proposed construction...DATES AND MILESTONES OF USAMPS RELOCATIONA / Event Date CSJF completed --USAMPS relocation to Fort Devens not justified 22 July 1971 Criminal
Fautrelle, L; Barbieri, G; Ballay, Y; Bonnetblanc, F
2011-10-27
The time required to complete a fast and accurate movement is a function of its amplitude and the target size. This phenomenon refers to the well known speed-accuracy trade-off. Some interpretations have suggested that the speed-accuracy trade-off is already integrated into the movement planning phase. More specifically, pointing movements may be planned to minimize the variance of the final hand position. However, goal-directed movements can be altered at any time, if for instance, the target location is changed during execution. Thus, one possible limitation of these interpretations may be that they underestimate feedback processes. To further investigate this hypothesis we designed an experiment in which the speed-accuracy trade-off was unexpectedly varied at the hand movement onset by modifying separately the target distance or size, or by modifying both of them simultaneously. These pointing movements were executed from an upright standing position. Our main results showed that the movement time increased when there was a change to the size or location of the target. In addition, the terminal variability of finger position did not change. In other words, it showed that the movement velocity is modulated according to the target size and distance during motor programming or during the final approach, independently of the final variability of the hand position. It suggests that when the speed-accuracy trade-off is unexpectedly modified, terminal feedbacks based on intermediate representations of the endpoint velocity are used to monitor and control the hand displacement. There is clearly no obvious perception-action coupling in this case but rather intermediate processing that may be involved. Copyright © 2011 IBRO. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-28
... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...
78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2013-0499; FRL-9901-35-Region3...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to..., Associate Director, Office of Air Program Planning, Mailcode 3AP30, U.S. Environmental Protection Agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2009-0790; FRL-9114-3] Approval and...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action..., Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 Wynkoop Street, Denver, Colorado 80202...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Expulsion of Exchange Members § 240.19d-1 Notices by self-regulatory organizations of final disciplinary... services, and summary suspensions. (a) General. If any self-regulatory organization for which the...) of the Act, concerning an action subject to such section taken by a self-regulatory organization for...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Expulsion of Exchange Members § 240.19d-1 Notices by self-regulatory organizations of final disciplinary... services, and summary suspensions. (a) General. If any self-regulatory organization for which the...) of the Act, concerning an action subject to such section taken by a self-regulatory organization for...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Expulsion of Exchange Members § 240.19d-1 Notices by self-regulatory organizations of final disciplinary... services, and summary suspensions. (a) General. If any self-regulatory organization for which the...) of the Act, concerning an action subject to such section taken by a self-regulatory organization for...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Expulsion of Exchange Members § 240.19d-1 Notices by self-regulatory organizations of final disciplinary... services, and summary suspensions. (a) General. If any self-regulatory organization for which the...) of the Act, concerning an action subject to such section taken by a self-regulatory organization for...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Expulsion of Exchange Members § 240.19d-1 Notices by self-regulatory organizations of final disciplinary... services, and summary suspensions. (a) General. If any self-regulatory organization for which the...) of the Act, concerning an action subject to such section taken by a self-regulatory organization for...
37 CFR 1.116 - Amendments and affidavits or other evidence after final action and prior to appeal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Amendments and affidavits or other evidence after final action and prior to appeal. 1.116 Section 1.116 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN...
37 CFR 1.116 - Amendments and affidavits or other evidence after final action and prior to appeal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Amendments and affidavits or other evidence after final action and prior to appeal. 1.116 Section 1.116 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9135-1] Clean Water Act Section 303(d): Final Agency Action... the Clean Water Act (CWA). Documents from the administrative record file for the seven TMDLs... Oxygen. 010401 East Atchafalaya Mercury. Basin and Morganza Floodway South to Interstate 10 Canal. 010501...
Djandji, Fabienne; Lamontagne, Alexandrine J; Blais, Lucie; Bacon, Simon L; Ernst, Pierre; Grad, Roland; Lavoie, Kim L; McKinney, Martha L; Desplats, Eve; Ducharme, Francine M
2017-03-31
Despite national recommendations, most patients with asthma are not given a written action plan . The objectives were to ascertain physicians' endorsement of potential enablers to providing a written action plan, and the determinants and proportion, of physician-reported use of a written action plan. We surveyed 838 family physicians, paediatricians, and emergency physicians in Quebec. The mailed questionnaire comprised 102 questions on asthma management, 11 of which pertained to written action plan and promising enablers. Physicians also selected a case vignette that best corresponded to their practice and reported their management. The survey was completed by 421 (56%) physicians (250 family physicians, 115 paediatricians and 56 emergency physicians); 43 (5.2%) reported providing a written action plan to ≥70% of their asthmatic patients and 126 (30%) would have used a written action plan in the selected vignette. Most (>60%) physicians highly endorsed the following enablers: patients requesting a written action plan, adding a blank written action plan to the chart, receiving a copy of the written action plan completed by a consultant, receiving a monetary compensation for its completion, and having another healthcare professional explain the completed written action plan to patients. Four determinants were significantly associated with providing a written action plan: being a paediatrician (RR:2.1), treating a child (RR:2.0), aiming for long-term asthma control (RR:2.5), and being aware of national recommendations to provide a written action plan to asthmatic patients (RR:2.9). A small minority of Quebec physicians reported providing a written action plan to most of their patients, revealing a huge care gap. Several enablers to improve uptake, highly endorsed by physicians, should be prioritised in future implementation efforts. ENCOURAGING DOCTORS TO PROVIDE WRITTEN ACTION PLANS: Changes to practice organization and doctors' perceptions should encourage the provision of written action plans for all asthma patients. International guidelines state that effective long-term treatment of asthma requires educated self-management, regular reviews and provision of a written action plan (WAP). However, many patients have poor asthma control and as few as 30 per cent have a WAP. Fabienne Djandji at the Saint-Justine University Central Hospital in Montreal, Canada, and co-workers conducted a survey of 421 doctors to determine their attitudes and provision of WAPs. Only 5.2 per cent of respondents provided WAPs to patients; those treating children or aiming for long-term asthma control were more likely to do so. The doctors said that incentives to provide WAPs would include requests from patients themselves, being paid to complete WAPs and having extra support from specialists or other health care professionals such as pharmacists.
Singleton, Christa-Marie; Debastiani, Summer; Rose, Dale; Kahn, Emily B
2014-01-01
To identify the extent to which the Homeland Security Exercise and Evaluation Program's (HSEEP) After Action Report/Improvement Plan (AAR/IP) template was followed by public health entities and facilitated the identification of detailed corrective actions and continuous improvement. Data were drawn from the US H1N1 Public Health Emergency Response (PHER) federal grant awardees (n = 62). After action report/improvement plan text was examined to identify the presence of AAR/IP HSEEP elements and characterized as "minimally complete," "partially complete," or "complete." Corrective actions (CA) and recommendations within the IP focusing on performance deficits were coded as specific, measurable, and time-bound, and whether they were associated with a problem that met root cause criteria and whether the CA/recommendation was intended to address or fix the root cause. A total of 2619 CA/recommendations were identified. More than half (n = 1480, 57%) addressed root causes. Corrective actions/recommendations associated with complete AARs more frequently addressed root cause (58% vs 51%, χ = 9.1, P < 0.003) and were more specific (34% vs 23%, χ = 32.3, P < 0.0001), measurable (30% vs 18%, χ = 37.9, P < 0.0001), and time-bound (38% vs 15%, χ = 115.5, P < 0.0001) than partially complete AARs. The same pattern was not observed with completeness of IPs. Corrective actions and recommendations were similarly specific and measurable. Recommendations significantly addressed root cause more than CAs. Our analysis indicates a possible lack of awardee distinction between CA and recommendations in AARs. As HSEEP adapts to align with the 2011 National Preparedness Goal and National Preparedness System, future HSEEP documents should emphasize the importance of root cause analysis as a required element within AAR documents and templates in the exercise and real incident environment, as well as the need for specific and measurable CAs.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
...This action promulgates amendments to the National Emission Standards for Hazardous Air Pollutants for Source Categories: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities; and Gasoline Dispensing Facilities, which EPA promulgated on January 10, 2008, and amended on March 7, 2008. In this action, EPA is finalizing amendments and clarifications to certain definitions and applicability provisions of the final rules in response to some of the issues raised in the petitions for reconsideration. In addition, several other compliance-related questions posed by various individual stakeholders and State and local agency representatives are addressed in this action. We are also denying reconsideration on one issue raised in a petition for reconsideration received by the Agency on the final rules.
47 CFR 1.425 - Commission action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Commission action. 1.425 Section 1.425... Proceedings § 1.425 Commission action. The Commission will consider all relevant comments and material of record before taking final action in a rulemaking proceeding and will issue a decision incorporating its...
47 CFR 1.425 - Commission action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission action. 1.425 Section 1.425... Proceedings § 1.425 Commission action. The Commission will consider all relevant comments and material of record before taking final action in a rulemaking proceeding and will issue a decision incorporating its...
The topography of generosity: asymmetric evaluations of prosocial actions.
Klein, Nadav; Epley, Nicholas
2014-12-01
Prosociality is considered a virtue. Those who care for others are admired, whereas those who care only for themselves are despised. For one's reputation, it pays to be nice. Does it pay to be even nicer? Four experiments assess reputational inferences across the entire range of prosocial outcomes in zero-sum interactions, from completely selfish to completely selfless actions. We observed consistent nonlinear evaluations: Participants evaluated selfish actions more negatively than equitable actions, but they did not evaluate selfless actions markedly more favorably than equitable actions. This asymptotic pattern reflected monotonic evaluations for increasingly selfish actions and insensitivity to increasingly selfless actions. It pays to be nice but not to be really nice. Additional experiments suggest that this pattern stems partly from failing to make spontaneous comparisons between varying degrees of selflessness. We suggest that these reputational incentives could guide social norms, encouraging equitable actions but discouraging extremely selfless actions. PsycINFO Database Record (c) 2014 APA, all rights reserved.
ERIC Educational Resources Information Center
Pennsylvania State Univ., McKeesport.
This publication consists of the complete set of 23 monographs developed by the Pennsylvania Action Research Network to supplement the 67 monographs produced over the past 3 years. The specific audience are literacy, General Educational Development (GED), and English-as-a Second Language (ESL) practitioners. The titles are: "Use of…
Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts
1995-08-01
Fort Devens . The table will be updated as additional remedial actions are completed . Following Table D-1 are the executive summaries of...provides for the identification of appropriate, cost effective and integrated remedial actions , installation-wide. The BCT is working with the Fort Devens ...and 3-5, respectively. Three compliance-related activities at Fort Devens have been completed as early actions in order to reduce or eliminate
47 CFR 1.115 - Application for review of action taken pursuant to delegated authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Application for review of action taken pursuant... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of Actions § 1.115 Application for review of action taken pursuant to delegated authority. (a) Any person...
47 CFR 1.115 - Application for review of action taken pursuant to delegated authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Application for review of action taken pursuant... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of Actions § 1.115 Application for review of action taken pursuant to delegated authority. (a) Any person...
47 CFR 1.115 - Application for review of action taken pursuant to delegated authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Application for review of action taken pursuant... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of Actions § 1.115 Application for review of action taken pursuant to delegated authority. (a) Any person...
47 CFR 1.115 - Application for review of action taken pursuant to delegated authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Application for review of action taken pursuant... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of Actions § 1.115 Application for review of action taken pursuant to delegated authority. (a) Any person...
2016-07-01
All Initial Designs for Final Fab Run Month 29 Masks and wafers prepared for Final Fab Run Month 30 Start of Final Fab Run Month 35 Completion of...Final Fab Run Month 36 Delivery of devices based on designs from other DEFYS performers Because of momentum from efforts prior to the start of...report (June 2016), our project is completed, with most tasks completed ahead of schedule. For example, the 3rd Fab Run started 5 months early and was
Shoemaker, Sarah J.; Wolf, Michael S.; Brach, Cindy
2016-01-01
Objective To develop a reliable and valid instrument to assess the understandability and actionability of print and audiovisual materials. Methods We compiled items from existing instruments/guides that the expert panel assessed for face/content validity. We completed four rounds of reliability testing, and produced evidence of construct validity with consumers and readability assessments. Results The experts deemed the PEMAT items face/content valid. Four rounds of reliability testing and refinement were conducted using raters untrained on the PEMAT. Agreement improved across rounds. The final PEMAT showed moderate agreement per Kappa (Average K = 0.57) and strong agreement per Gwet’s AC1 (Average = 0.74). Internal consistency was strong (α = 0.71; Average Item-Total Correlation = 0.62). For construct validation with consumers (n = 47), we found significant differences between actionable and poorly-actionable materials in comprehension scores (76% vs. 63%, p < 0.05) and ratings (8.9 vs. 7.7, p < 0.05). For understandability, there was a significant difference for only one of two topics on consumer numeric scores. For actionability, there were significant positive correlations between PEMAT scores and consumer-testing results, but no relationship for understandability. There were, however, strong, negative correlations between grade-level and both consumer-testing results and PEMAT scores. Conclusions The PEMAT demonstrated strong internal consistency, reliability, and evidence of construct validity. Practice implications The PEMAT can help professionals judge the quality of materials (available at: http://www.ahrq.gov/pemat). PMID:24973195
Shoemaker, Sarah J; Wolf, Michael S; Brach, Cindy
2014-09-01
To develop a reliable and valid instrument to assess the understandability and actionability of print and audiovisual materials. We compiled items from existing instruments/guides that the expert panel assessed for face/content validity. We completed four rounds of reliability testing, and produced evidence of construct validity with consumers and readability assessments. The experts deemed the PEMAT items face/content valid. Four rounds of reliability testing and refinement were conducted using raters untrained on the PEMAT. Agreement improved across rounds. The final PEMAT showed moderate agreement per Kappa (Average K=0.57) and strong agreement per Gwet's AC1 (Average=0.74). Internal consistency was strong (α=0.71; Average Item-Total Correlation=0.62). For construct validation with consumers (n=47), we found significant differences between actionable and poorly-actionable materials in comprehension scores (76% vs. 63%, p<0.05) and ratings (8.9 vs. 7.7, p<0.05). For understandability, there was a significant difference for only one of two topics on consumer numeric scores. For actionability, there were significant positive correlations between PEMAT scores and consumer-testing results, but no relationship for understandability. There were, however, strong, negative correlations between grade-level and both consumer-testing results and PEMAT scores. The PEMAT demonstrated strong internal consistency, reliability, and evidence of construct validity. The PEMAT can help professionals judge the quality of materials (available at: http://www.ahrq.gov/pemat). Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.
1993-06-01
Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutionsmore » to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.« less
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
77 FR 3288 - Receipt of Request for Action
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0004] Receipt of Request for Action Notice is hereby given... Director of the Office of Nuclear Reactor Regulation (NRR). As provided by 10 CFR 2.206, appropriate action... review to inform its final decision on whether to implement the requested actions. A copy of the petition...
77 FR 75390 - Significant New Use Rules on Certain Chemical Substances
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is promulgating significant new use rules (SNURs... subject of premanufacture notices (PMNs). This action requires persons who intend to manufacture, import... this action apply to me? You may be potentially affected by this action if you manufacture, import...
Bebeau, Muriel J
2009-01-01
Pretest scores were analyzed for 41 professionals referred for ethics assessment by a dental licensing board. Two were exempt from instruction based on pretest performance on five well-validated measures; 38 completed an individualized course designed to remediate deficiencies in ethical abilities. Statistically significant change (effect sizes ranging from .55 to 5.0) was observed for ethical sensitivity (DEST scores), moral reasoning (DIT scores), and role concept (essays and PROI scores). Analysis of the relationships between ability deficiencies and disciplinary actions supports the explanatory power of Rest's Four Component Model of Morality. Of particular interest is the way the model helped referred professionals deconstruct summary judgments about character and see them as capacities that can be further developed. The performance-based assessments, especially the DEST, were particularly useful in identifying shortcomings in ethical implementation. Referred practitioners highly valued the emphasis on ethical implementation, suggesting the importance of addressing what to do and say in ethically challenging cases. Finally, the required self-assessments of learning confirm the value of the process for professional renewal (i.e., a renewed commitment to professional ideals) and of enhanced abilities not only to reason about moral problems, but to implement actions.
A network dynamics approach to chemical reaction networks
NASA Astrophysics Data System (ADS)
van der Schaft, A. J.; Rao, S.; Jayawardhana, B.
2016-04-01
A treatment of a chemical reaction network theory is given from the perspective of nonlinear network dynamics, in particular of consensus dynamics. By starting from the complex-balanced assumption, the reaction dynamics governed by mass action kinetics can be rewritten into a form which allows for a very simple derivation of a number of key results in the chemical reaction network theory, and which directly relates to the thermodynamics and port-Hamiltonian formulation of the system. Central in this formulation is the definition of a balanced Laplacian matrix on the graph of chemical complexes together with a resulting fundamental inequality. This immediately leads to the characterisation of the set of equilibria and their stability. Furthermore, the assumption of complex balancedness is revisited from the point of view of Kirchhoff's matrix tree theorem. Both the form of the dynamics and the deduced behaviour are very similar to consensus dynamics, and provide additional perspectives to the latter. Finally, using the classical idea of extending the graph of chemical complexes by a 'zero' complex, a complete steady-state stability analysis of mass action kinetics reaction networks with constant inflows and mass action kinetics outflows is given, and a unified framework is provided for structure-preserving model reduction of this important class of open reaction networks.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
... on the Proposed Klingle Valley Trail in Washington, DC AGENCY: Federal Highway Administration (FHWA... final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed Klingle Valley Trail... approvals for the following project in Northwest Washington, DC: The Klingle Valley Trail project. The...
1988-07-01
16. Construction Fixes ($K). ([ a16(s) [ bl6 (s)] [ d16(s) 17. Final Actions on Pursuit Cases. ([ a17(s) ]) [bl7(s)] [ d17(s) 18. Carry Over to Next...Construction Fixes ($K). ( [al6 ]) [ b16 ] [d16 17. Final Actions on Pursuit Cases. ( [a17 ]) [b17 ] [d17 18. Carry Over to Next Quarter. [b18 ] [d18 .else
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
...This action finalizes amendments to the federal plan and the new source performance standards for hospital/medical/infectious waste incinerators. This final action implements national standards promulgated in the 2009 amendments to the hospital/medical/infectious waste incinerator emissions guidelines that will result in reductions in emissions of certain pollutants from all affected units.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-14
... specified in the proposed rule: i. Clarify the time frames within which members must take action to effect... a final decision of a FINRA officer or the UPC Committee under NASD Rule 11890 (Clearly Erroneous... refusal by a member to take action necessary to effectuate a final decision of a FINRA officer or the UPC...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-12
... Class I Areas Under 40 CFR 51.309 AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... (RHR) for the mandatory Class I areas under 40 CFR 51.309. EPA proposed that the January 12, 2011 and... RHR requirements for the mandatory Class I areas under 40 CFR 51.309. EPA taking final action to find...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... action is EPA approving? B. Why is EPA approving this delisting? C. How will Beaumont Refinery manage the wastes, if it is delisted? D. When would the delisting exclusion be finalized? E. How would this action... petition? D. What were the results of Beaumont Refinery's analysis? E. How did EPA evaluate the risk of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-16
...This action finalizes the review of new source performance standards for the listed oil and natural gas source category. In this action the EPA revised the new source performance standards for volatile organic compounds from leaking components at onshore natural gas processing plants and new source performance standards for sulfur dioxide emissions from natural gas processing plants. The EPA also established standards for certain oil and gas operations not covered by the existing standards. In addition to the operations covered by the existing standards, the newly established standards will regulate volatile organic compound emissions from gas wells, centrifugal compressors, reciprocating compressors, pneumatic controllers and storage vessels. This action also finalizes the residual risk and technology review for the Oil and Natural Gas Production source category and the Natural Gas Transmission and Storage source category. This action includes revisions to the existing leak detection and repair requirements. In addition, the EPA has established in this action emission limits reflecting maximum achievable control technology for certain currently uncontrolled emission sources in these source categories. This action also includes modification and addition of testing and monitoring and related notification, recordkeeping and reporting requirements, as well as other minor technical revisions to the national emission standards for hazardous air pollutants. This action finalizes revisions to the regulatory provisions related to emissions during periods of startup, shutdown and malfunction.
2016-01-01
Implementing a new technical process demands a complex preparation. In cardiac surgery this complex preparation is often reduced to visiting a surgeon who is familiar with a technique. The science of learning has identified that several steps are needed towards a successful implementation. The first step is the creation of a complete conceptual approach; this demands the deposit in writing of the actions and reactions of every involved party in this new approach. By definition a successful implementation starts with the creation of a group of involved individuals willing to collaborate towards a new goal. Then every teachable component, described in this concept, needs to be worked out in simulation training, from the smallest manual step to complete scenario training for complex situations. Finally, optimal organisational learning needs to have an existing database of the previous situation, a clear goal and objective and a new database where every new approach is restudied versus the previous one, using appropriate methods of corrections for variability. A complete implementation will always be more successful versus a partial one, due to the habit in partial implementation to return to the previous routines. PMID:27942400
Shalom, Erez; Shahar, Yuval; Lunenfeld, Eitan
2016-02-01
Design, implement, and evaluate a new architecture for realistic continuous guideline (GL)-based decision support, based on a series of requirements that we have identified, such as support for continuous care, for multiple task types, and for data-driven and user-driven modes. We designed and implemented a new continuous GL-based support architecture, PICARD, which accesses a temporal reasoning engine, and provides several different types of application interfaces. We present the new architecture in detail in the current paper. To evaluate the architecture, we first performed a technical evaluation of the PICARD architecture, using 19 simulated scenarios in the preeclampsia/toxemia domain. We then performed a functional evaluation with the help of two domain experts, by generating patient records that simulate 60 decision points from six clinical guideline-based scenarios, lasting from two days to four weeks. Finally, 36 clinicians made manual decisions in half of the scenarios, and had access to the automated GL-based support in the other half. The measures used in all three experiments were correctness and completeness of the decisions relative to the GL. Mean correctness and completeness in the technical evaluation were 1±0.0 and 0.96±0.03 respectively. The functional evaluation produced only several minor comments from the two experts, mostly regarding the output's style; otherwise the system's recommendations were validated. In the clinically oriented evaluation, the 36 clinicians applied manually approximately 41% of the GL's recommended actions. Completeness increased to approximately 93% when using PICARD. Manual correctness was approximately 94.5%, and remained similar when using PICARD; but while 68% of the manual decisions included correct but redundant actions, only 3% of the actions included in decisions made when using PICARD were redundant. The PICARD architecture is technically feasible and is functionally valid, and addresses the realistic continuous GL-based application requirements that we have defined; in particular, the requirement for care over significant time frames. The use of the PICARD architecture in the domain we examined resulted in enhanced completeness and in reduction of redundancies, and is potentially beneficial for general GL-based management of chronic patients. Copyright © 2015 Elsevier Inc. All rights reserved.
Multiplexer/demultiplexer flexibility enhancement program
NASA Technical Reports Server (NTRS)
1978-01-01
This final report summarizes the accomplishments of the NASA/JSC MDM Flexibility Enhancement Program, Contract NAS9-15359 as carried out by Sperry Flight Systems from April through December 1977. Included are discussions of major statement of work tasks and the results, conclusions and recommended actions. All tasks called out in the amended SOW were carried out. Significant development tasks which were completed included the following: (1) Development, breadboard and test of a Pulse Output 28-volt Module. (2) Development and test of a 32-channel DC Analog Input (DCIN) Differential Module. (3) Development and test of a sequence memory module using an M2708 EPROM which can be programmed in the unit. (4) Development and test of a radiator top cover for a radiation-cooled Flexible MDM.
CSAPR Direct Final Rule (77 FR 10342)
EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).
32 CFR 536.62 - Action memorandums.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 3 2011-07-01 2009-07-01 true Action memorandums. 536.62 Section 536.62... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.62 Action memorandums. (a) When... claims on which suit is filed before final action, see § 536.66. A settlement authority may deny or pay...
32 CFR 536.62 - Action memorandums.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 3 2010-07-01 2010-07-01 true Action memorandums. 536.62 Section 536.62... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.62 Action memorandums. (a) When... claims on which suit is filed before final action, see § 536.66. A settlement authority may deny or pay...
76 FR 12550 - Lavatory Oxygen Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...
Hunt, Hillary R; Gross, Alan M
2009-11-01
Obesity is a world-wide health concern approaching epidemic proportions. Successful long-term treatment involves a combination of bariatric surgery, diet, and exercise. Social cognitive models, such as the Theory of Reasoned Action (TRA) and the Theory of Planned Behavior (TPB), are among the most commonly tested theories utilized in the prediction of exercise. As exercise is not a completely volitional behavior, it is hypothesized that the TPB is a superior theoretical model for the prediction of exercise intentions and behavior. This study tested validity of the TPB in a sample of bariatric patients and further validated its improvement over the TRA in predicting exercise adherence at different operative stages. Results generally confirmed research hypotheses. Superiority of the TPB model was validated in this sample of bariatric patients, and Perceived Behavioral Control emerged as the single-best predictor of both exercise intentions and self-reported behavior. Finally, results suggested that both subjective norms and attitudes toward exercise played a larger role in the prediction of intention and behavior than previously reported.
A Consensus Action Agenda for Achieving the National Health Information Infrastructure
Yasnoff, William A.; Humphreys, Betsy L.; Overhage, J. Marc; Detmer, Don E.; Brennan, Patricia Flatley; Morris, Richard W.; Middleton, Blackford; Bates, David W.; Fanning, John P.
2004-01-01
Background: Improving the safety, quality, and efficiency of health care will require immediate and ubiquitous access to complete patient information and decision support provided through a National Health Information Infrastructure (NHII). Methods: To help define the action steps needed to achieve an NHII, the U.S. Department of Health and Human Services sponsored a national consensus conference in July 2003. Results: Attendees favored a public–private coordination group to guide NHII activities, provide education, share resources, and monitor relevant metrics to mark progress. They identified financial incentives, health information standards, and overcoming a few important legal obstacles as key NHII enablers. Community and regional implementation projects, including consumer access to a personal health record, were seen as necessary to demonstrate comprehensive functional systems that can serve as models for the entire nation. Finally, the participants identified the need for increased funding for research on the impact of health information technology on patient safety and quality of care. Individuals, organizations, and federal agencies are using these consensus recommendations to guide NHII efforts. PMID:15187075
N-acetylcysteine (NAC) in neurological disorders: mechanisms of action and therapeutic opportunities
Bavarsad Shahripour, Reza; Harrigan, Mark R; Alexandrov, Andrei V
2014-01-01
Background There is an expanding field of research investigating the benefits of medicines with multiple mechanisms of action across neurological disorders. N-acetylcysteine (NAC), widely known as an antidote to acetaminophen overdose, is now emerging as treatment of vascular and nonvascular neurological disorders. NAC as a precursor to the antioxidant glutathione modulates glutamatergic, neurotrophic, and inflammatory pathways. Aim and discussion Most NAC studies up to date have been carried out in animal models of various neurological disorders with only a few studies completed in humans. In psychiatry, NAC has been tested in over 20 clinical trials as an adjunctive treatment; however, this topic is beyond the scope of this review. Herein, we discuss NAC molecular, intracellular, and systemic effects, focusing on its potential applications in neurodegenerative diseases including spinocerebellar ataxia, Parkinson's disease, tardive dyskinesia, myoclonus epilepsy of the Unverricht–Lundbor type as well as multiple sclerosis, amyotrophic lateral sclerosis, and Alzheimer's disease. Conclusion Finally, we review the potential applications of NAC to facilitate recovery after traumatic brain injury, cerebral ischemia, and in treatment of cerebrovascular vasospasm after subarachnoid hemorrhage. PMID:24683506
Motamedzade, Majid; Ashuri, Mohammad Reza; Golmohammadi, Rostam; Mahjub, Hossein
2011-06-13
During the last decades, to assess the risk factors of work-related musculoskeletal disorders (WMSDs), enormous observational methods have been developed. Rapid Entire Body Assessment (REBA) and Quick Exposure Check (QEC) are two general methods in this field. This study aimed to compare ergonomic risk assessment outputs from QEC and REBA in terms of agreement in distribution of postural loading scores based on analysis of working postures. This cross-sectional study was conducted in an engine oil company in which 40 jobs were studied. All jobs were observed by a trained occupational health practitioner. Job information was collected to ensure the completion of ergonomic risk assessment tools, including QEC, and REBA. The result revealed that there was a significant correlation between final scores (r=0.731) and the action levels (r =0.893) of two applied methods. Comparison between the action levels and final scores of two methods showed that there was no significant difference among working departments. Most of studied postures acquired low and moderate risk level in QEC assessment (low risk=20%, moderate risk=50% and High risk=30%) and in REBA assessment (low risk=15%, moderate risk=60% and high risk=25%). There is a significant correlation between two methods. They have a strong correlation in identifying risky jobs, and determining the potential risk for incidence of WMSDs. Therefore, there is possibility for researchers to apply interchangeably both methods, for postural risk assessment in appropriate working environments.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... on the Interchange of State Loop 1604 and United States Highway 281 in Texas AGENCY: Federal Highway... agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the interchange of Texas State Loop 1604 (LP 1604) with United States Highway 281 (US 281...
Virtual Action Learning: A Pilot in Building Leadership Capacity
ERIC Educational Resources Information Center
Radcliff, Phil
2017-01-01
This account of practice encompasses a pilot virtual action learning programme with a small group of learners. This was an 18-month extension to the one-week Leadership Open Programme that the participants had previously completed at the Business School. It includes insights from an evaluation study completed in early 2016. It considers in…
33 CFR 50.5 - Action by the Board.
Code of Federal Regulations, 2010 CFR
2010-07-01
... GUARD RETIRING REVIEW BOARD § 50.5 Action by the Board. (a) After a complete and thorough review of the... appointments, when the physical disability was incurred. (c) The findings and decision of a majority of the... will prepare a complete record thereof including (1) the application for review (2) a transcript of the...
50 CFR 11.17 - Payment of final assessment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANTS CIVIL PROCEDURES Assessment Procedure § 11.17 Payment of final assessment. When a final... request the Attorney General to institute a civil action in the U.S. District Court to collect the penalty. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before December 26, 2012. If the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-21
... Activities; Proposed Collection; Comment Request; Final Authorization for Hazardous Waste Management Programs... Request (ICR) concerning final authorization for State Hazardous Waste Management Programs. This ICR is... potentially affected by this action are States. Title: Final Authorization for Hazardous Waste Management...
Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, Milan, TN, March 11, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-09-01
This decision document presents the selected action for the Salvage Yard, Former Ammunition Burnout Area (ABA), and Sanitary Landfill at MLAAP, located in Gibson and Carroll Counties, TN. This ROD addresses the final response action planned for the Salvage Yard, Former ABA, and Sanitary Landfill, including soil and groundwater. NFA is the selected remedy for soil and groundwater at the Salvage Yard, Former ABA, and Sanitary landfill. The selected remedy manages the risk to acceptable levels for both human health and the environment and is the final action planned.
32 CFR 536.82 - Reopening an MCA claim after final action by a settlement authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... change in action will be stated in a memorandum included in the file. For example, a claim was settled... claimant or claimant's legal representative, will reopen action on that claim and, if the belief is...
Direct Final Rule for Exhaust Emission Standards for 2012 and Later Model Year Snowmobiles
In this action removing the NOX component from the Phase 3 emission standard calculation and deferring action on the 2012 CO and HC emission standards portion of the court’s remand to a separate rulemaking action.
5 CFR 1201.127 - Judicial review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES Procedures for Original Jurisdiction Cases Special Counsel Disciplinary Actions § 1201.127 Judicial review. (a) An employee subject to a final Board decision imposing disciplinary action under 5 U.S... appropriate United States district court. 5 U.S.C. 1508. Special Counsel Corrective Actions ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... under the Clean Air Act (CAA), EPA is taking final action to approve state implementation plan (SIP... the background for this action? II. What action is EPA taking? III. Statutory and Executive Order... proposal to approve Indiana's state board provisions. II. What action is EPA taking? For the reasons...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false DOT actions. 323.13 Section 323.13... REGULATIONS TERMINATIONS, SUSPENSIONS, AND REDUCTIONS OF SERVICE § 323.13 DOT actions. (a) If an objection has...; (2) Issue a notice or a final order that it will take no action on a notice filed under § 323.3; or...
75 FR 29431 - Coat Protein of Plum Pox Virus; Exemption from the Requirement of a Tolerance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-26
... (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an exemption from the requirement of a... SUPPLEMENTARY INFORMATION). ADDRESSES: EPA has established a docket for this action under docket identification... A. Does this Action Apply to Me? You may be potentially affected by this action if you are an...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2013 CFR
2013-10-01
... public with a statement of its final decision and shall explain the relevant factors considered by the... provided the final notice. (b) For actions for which an environmental impact statement is being prepared... environmental assessment was prepared, the Notice of No Significant Impact is adequate to constitute final...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2012 CFR
2012-10-01
... public with a statement of its final decision and shall explain the relevant factors considered by the... provided the final notice. (b) For actions for which an environmental impact statement is being prepared... environmental assessment was prepared, the Notice of No Significant Impact is adequate to constitute final...
49 CFR 520.28 - Preparation of final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all...
49 CFR 1503.661 - Judicial review of a final order.
Code of Federal Regulations, 2010 CFR
2010-10-01
... AND ENFORCEMENT PROCEDURES Rules of Practice in TSA Civil Penalty Actions § 1503.661 Judicial review of a final order. For violations of a TSA requirement, a party may petition for review of a final...
Braided Categories of Endomorphisms as Invariants for Local Quantum Field Theories
NASA Astrophysics Data System (ADS)
Giorgetti, Luca; Rehren, Karl-Henning
2018-01-01
We want to establish the "braided action" (defined in the paper) of the DHR category on a universal environment algebra as a complete invariant for completely rational chiral conformal quantum field theories. The environment algebra can either be a single local algebra, or the quasilocal algebra, both of which are model-independent up to isomorphism. The DHR category as an abstract structure is captured by finitely many data (superselection sectors, fusion, and braiding), whereas its braided action encodes the full dynamical information that distinguishes models with isomorphic DHR categories. We show some geometric properties of the "duality pairing" between local algebras and the DHR category that are valid in general (completely rational) chiral CFTs. Under some additional assumptions whose status remains to be settled, the braided action of its DHR category completely classifies a (prime) CFT. The approach does not refer to the vacuum representation, or the knowledge of the vacuum state.
78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...
78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...
75 FR 39292 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... CFR 240.19d-1)--Notices by Self-Regulatory Organizations of Final Disciplinary Actions, Denials Bars... actions: (1) Disciplinary sanctions (including summary suspensions); (2) denials of membership... association with a member, and similar adjudicated findings. The Rule requires that such actions be promptly...
78 FR 50322 - Amendment of Class E Airspace; Point Thomson, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... Area Navigation (RNAV) Global Positioning System (GPS) standard instrument approach procedures have been established at the airport. This action enhances the safety and management of aircraft operations... Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action modifies the airspace at Point...
78 FR 39968 - Flight Data Recorder Airplane Parameter Specification Omissions and Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... comprise the adoption of a different standard that will affect airplanes operating under these regulations...), DOT. ACTION: Final rule; request for comments. SUMMARY: This action amends the operating regulations... technical questions concerning this action contact Chris Parfitt, Flight Standards Service, Aircraft...
49 CFR 630.9 - Notice of FTA action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Notice of FTA action. 630.9 Section 630.9 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION NATIONAL TRANSIT DATABASE § 630.9 Notice of FTA action. Before taking final...
49 CFR 630.9 - Notice of FTA action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Notice of FTA action. 630.9 Section 630.9 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION NATIONAL TRANSIT DATABASE § 630.9 Notice of FTA action. Before taking final...
49 CFR 630.9 - Notice of FTA action.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Notice of FTA action. 630.9 Section 630.9 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION NATIONAL TRANSIT DATABASE § 630.9 Notice of FTA action. Before taking final...
49 CFR 630.9 - Notice of FTA action.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Notice of FTA action. 630.9 Section 630.9 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION NATIONAL TRANSIT DATABASE § 630.9 Notice of FTA action. Before taking final...
49 CFR 630.9 - Notice of FTA action.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Notice of FTA action. 630.9 Section 630.9 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION NATIONAL TRANSIT DATABASE § 630.9 Notice of FTA action. Before taking final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.
Young Children's Causal Explanations Are Biased by Post-Action Associative Information
ERIC Educational Resources Information Center
Atance, Cristina M.; Metcalf, Jennifer L.; Martin-Ordas, Gema; Walker, Cheryl L.
2014-01-01
In a series of 4 experiments, we tested children's understanding that the causes of their actions must necessarily be attributed to information known prior to (i.e., "pre-action" information), rather than after (i.e., "post-action" information), the completion of their actions. For example, children were shown a dog, asked…
Object-Driven and Temporal Action Rules Mining
ERIC Educational Resources Information Center
Hajja, Ayman
2013-01-01
In this thesis, I present my complete research work in the field of action rules, more precisely object-driven and temporal action rules. The drive behind the introduction of object-driven and temporally based action rules is to bring forth an adapted approach to extract action rules from a subclass of systems that have a specific nature, in which…
Goal Reconstruction: How Teton Blends Situated Action and Planned Action
1989-11-03
DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on...: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of... meaning of 23 U.S.C. 139(l)(1). The actions relate to the Interstate 395 High Occupancy Vehicle (HOV) Ramp...
2005-03-01
described in previous semiannual reports on which corrective action has not been completed ... ” 29-31 Section 5(a)(4) “a summary of matters referred to...ASD(HD) on February 17, 2005, identified four major areas for management action : (1) integration of program concepts, (2) completion of assessment...Force material provided in response to the Deputy’s August 2004 memorandum. The DoD OIG expects to complete the existing review, packaging, and
Further Automate Planned Cluster Maintenance to Minimize System Downtime during Maintenance Windows
DOE Office of Scientific and Technical Information (OSTI.GOV)
Springmeyer, R.
This report documents the integration and testing of the automated update process of compute clusters in LC to minimize impact to user productivity. Description: A set of scripts will be written and deployed to further standardize cluster maintenance activities and minimize downtime during planned maintenance windows. Completion Criteria: When the scripts have been deployed and used during planned maintenance windows and a timing comparison is completed between the existing process and the new more automated process, this milestone is complete. This milestone was completed on Aug 23, 2016 on the new CTS1 cluster called Jade when a request to upgrademore » the version of TOSS 3 was initiated while SWL jobs and normal user jobs were running. Jobs that were running when the update to the system began continued to run to completion. New jobs on the cluster started on the new release of TOSS 3. No system administrator action was required. Current update procedures in TOSS 2 begin by killing all users jobs. Then all diskfull nodes are updated, which can take a few hours. Only after the updates are applied are all nodes are rebooted, and then finally put back into service. A system administrator is required for all steps. In terms of human time spent during a cluster OS update, the TOSS 3 automated procedure on Jade took 0 FTE hours. Doing the same update without the Toss Update Tool would have required 4 FTE hours.« less
49 CFR 520.29 - Internal review of final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Internal review of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon... office originating the action, the final environmental statement shall be accompanied by a brief cover...
40 CFR 35.110 - Time frame for EPA action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Time frame for EPA action. 35.110... ASSISTANCE STATE AND LOCAL ASSISTANCE Environmental Program Grants Epa Action on Application § 35.110 Time frame for EPA action. The Regional Administrator will review a complete application and either approve...
Code of Federal Regulations, 2011 CFR
2011-01-01
... action taken against a preference eligible employee in the competitive service who has completed the... U.S.C. 3502; (5) An action under 5 U.S.C. 1215; (6) An action against an administrative law judge... contrary to law or regulation; (13) An action taken under a provision of statute, other than one codified...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
Action Research in Schools: The Practitioners' Perspectives
ERIC Educational Resources Information Center
Song, Liyan; Kenton, Jeffrey M.
2010-01-01
This paper presents a study on the effectiveness of an action research model from the perspectives of school educators as action researchers. The study design followed seven action researchers--inservice teachers and school library media specialists--as they completed research projects in their schools. Data came from three different sources:…
77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...
76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...
77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; proposed incidental harassment... specified activity includes all or part of the following actions, dependent on final funding levels: Removal... regularly found within the action area. Two Steller sea lions [[Page 56174
76 FR 41554 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327, the United States Fish and Wildlife Service (USFWS), and the United...
75 FR 41277 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
... of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before January 11, 2011. If the...
76 FR 46356 - Notice of Final Federal Agency Actions on Proposed Highway in Idaho
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-02
... Limitation on Claims for Judicial Review of Actions by FHWA. SUMMARY: This notice announces actions taken by....C. 139(I)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or prior to January 29, 2012. If the Federal law that...
The effects of poliomyelitis on motor unit behavior during repetitive muscle actions: a case report.
Trevino, Michael A; Herda, Trent J; Cooper, Michael A
2014-09-06
Acute paralytic poliomyelitis is caused by the poliovirus and usually results in muscle atrophy and weakness occurring in the lower limbs. Indwelling electromyography has been used frequently to investigate the denervation and innervation characteristics of the affected muscle. Recently developed technology allows the decomposition of the raw surface electromyography signals into the firing instances of single motor units. There is limited information regarding this electromyographic decomposition in clinical populations. In addition, regardless of electromyographic methods, no study has examined muscle activation parameters during repetitive muscle actions in polio patients. Therefore, the purpose of this study was to examine the motor unit firing rates and electromyographic amplitude and center frequency of the vastus lateralis during 20 repetitive isometric muscle actions at 50% maximal voluntary contraction in healthy subjects and one patient that acquired acute paralytic poliomyelitis. One participant that acquired acute type III spinal poliomyelitis (Caucasian male, age = 29 yrs) at 3 months of age and three healthy participants (Caucasian females, age = 19.7 ± 2.1 yrs) participated in this study. The polio participant reported neuromuscular deficiencies as a result of disease in the hips, knees, buttocks, thighs, and lower legs. None of the healthy participants reported any current or ongoing neuromuscular diseases or musculoskeletal injuries. An acute bout of poliomyelitis altered motor unit behavior, such as, healthy participants displayed greater firing rates than the polio patient. The reduction in motor unit firing rates was likely a fatigue protecting mechanism since denervation via poliomyelitis results in a reduction of motorneurons. In addition, the concurrent changes in motor unit firing rates, electromyography amplitude and frequency for the polio participant would suggest that the entire motorneuron pool was utilized in each contraction unlike for the healthy participants. Finally, healthy participants exhibited changes in all electromyographic parameters during the repetitive muscle actions despite successfully completing all contractions with only a slight reduction in force. Thus, caution is warranted when quantifying muscular fatigue via motor unit firing rates and other electromyographic parameters since the parameters changed despite successful completing of all contractions with only a moderate reduction in strength in healthy subjects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by FHWA, Army... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before October 5, 2010. If...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
.... 139(l)(1). The I-75 Express Lanes Project will design a managed lane system along I-75 from the SR 155..., permits and approvals for the project. DATES: By this notice, the FHWA is advising the public of the final... action on the highway project will be barred unless the claim is filed on or before December 2, 2013. If...
Stewardson, Andrew J; Iten, Anne; Camus, Véronique; Gayet-Ageron, Angèle; Caulfield, Darren; Lacey, Gerard; Pittet, Didier
2014-01-01
Hand hygiene is a key component of infection control in healthcare. WHO recommends that healthcare workers perform six specific poses during each hand hygiene action. SureWash (Glanta Ltd, Dublin, Ireland) is a novel device that uses video-measurement technology and immediate feedback to teach this technique. We assessed the impact of self-directed SureWash use on healthcare worker hand hygiene technique and evaluated the device's diagnostic capacity. A controlled before-after study: subjects in Group A were exposed to the SureWash for four weeks followed by Group B for 12 weeks. Each subject's hand hygiene technique was assessed by blinded observers at baseline (T0) and following intervention periods (T1 and T2). Primary outcome was performance of a complete hand hygiene action, requiring all six poses during an action lasting ≥20 seconds. The number of poses per hand hygiene action (maximum 6) was assessed in a post-hoc analysis. SureWash's diagnostic capacity compared to human observers was assessed using ROC curve analysis. Thirty-four and 29 healthcare workers were recruited to groups A and B, respectively. No participants performed a complete action at baseline. At T1, one Group A participant and no Group B participants performed a complete action. At baseline, the median number of poses performed per action was 2.0 and 1.0 in Groups A and B, respectively (p = 0.12). At T1, the number of poses per action was greater in Group A (post-intervention) than Group B (control): median 3.8 and 2.0, respectively (p<0.001). In Group A, the number of poses performed twelve weeks post-intervention (median 3.0) remained higher than baseline (p<0.001). The area under the ROC curves for the 6 poses ranged from 0.59 to 0.88. While no impact on complete actions was demonstrated, SureWash significantly increased the number of poses per hand hygiene action and demonstrated good diagnostic capacity.
78 FR 9054 - Issuance of Final Guidance Publication
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-07
... NIOSH-144] Issuance of Final Guidance Publication AGENCY: National Institute for Occupational Safety and... Services (HHS). ACTION: Notice of issuance of final guidance publication. SUMMARY: The National Institute...), announces the availability of the following publication: ``NIOSH Criteria for a Recommended Standard...
76 FR 8753 - Final Information Quality Guidelines Policy
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... DEPARTMENT OF HOMELAND SECURITY Final Information Quality Guidelines Policy AGENCY: Department of Homeland Security. ACTION: Notice and request for public comment on Final Information Quality Guidelines. SUMMARY: These guidelines should be used to ensure and maximize the quality of disseminated information...
78 FR 45938 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
...] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or...
2011-06-29
Action and Alternatives 9 2.5 Identification of the Preferred Action 10 3.0 AFFECTED ENVIRONMENT 13 3.1 New Boston Air Force Station 13 3.1.1 Air...the alternative actions is presented in Section 2.4. Finally, identification of the Preferred Action is presented in Section 2.5. 2.1 PROPOSED...presented in Chapter 4.0 of this EA. 2.5 IDENTIFICATION OF THE PREFERRED ACTION The USAF’s Preferred Action is to implement the Proposed Action at
78 FR 48294 - Amendment of Class E Airspace; Mason, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
...-1141; Airspace Docket No. 12-ASW-12] Amendment of Class E Airspace; Mason, TX AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class E airspace at Mason, TX... Approach Procedures at Mason County Airport. This action enhances the safety and management of Instrument...
77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-04
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...
75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2010 CFR
2010-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
5 CFR 1203.21 - Final order of the Board.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FOR REVIEW OF RULES AND REGULATIONS OF THE OFFICE OF PERSONNEL MANAGEMENT Order of the Board § 1203.21... any personnel action related to the prohibited personnel practice; (2) Rescission of any action related to the cancelled personnel action; (3) Removal of any reference, record, or document within an...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
... Internal Combustion Engines (Renewal) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...), ``NESHAP for Stationary Reciprocating Internal Combustion Engines (Renewal)'' (EPA ICR No. 1975.09, OMB... combustion engines (RICE) have been regulated under previous actions. Thus, this final action fulfills the...
78 FR 16401 - Institutional Review Boards; Correcting Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... Administration, HHS. ACTION: Final rule; correcting amendments. SUMMARY: The Food and Drug Administration (FDA... the regulatory text and to update contact information. This action is editorial in nature and is... action under the Administrative Procedures Act (5 U.S.C. 553). FDA has determined that notice and public...
42 CFR 93.315 - Notice to ORI of institutional findings and actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Final institutional action. State whether the institution found research misconduct, and if so, who... 42 Public Health 1 2011-10-01 2011-10-01 false Notice to ORI of institutional findings and actions... HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of Institutions The Institutional...
42 CFR 93.315 - Notice to ORI of institutional findings and actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Final institutional action. State whether the institution found research misconduct, and if so, who... 42 Public Health 1 2010-10-01 2010-10-01 false Notice to ORI of institutional findings and actions... HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of Institutions The Institutional...
77 FR 4458 - Amendment of Class E Airspace; Rugby, ND
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-30
...-0433; Airspace Docket No. 11-AGL-12] Amendment of Class E Airspace; Rugby, ND AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class E airspace for Rugby, ND. Decommissioning of the Rugby non-directional beacon (NDB) at Rugby Municipal Airport has made this action...
75 FR 18403 - Amendment of Class E Airspace; Rifle, CO
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
...-1014; Airspace Docket No. 09-ANM-10] Amendment of Class E Airspace; Rifle, CO AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action will establish Class E airspace at Rifle, CO.... This action also changes the airport name in the existing Class E airspace description. DATES...
78 FR 50323 - Amendment of Class E Airspace; Lexington, OK
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
...-0272; Airspace Docket No. 13-ASW-10] Amendment of Class E Airspace; Lexington, OK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class E airspace at... Class E surface area to a Class E transition area. This action enhances the safety and management of...
78 FR 48291 - Amendment of Class D Airspace; Columbus, Rickenbacker International Airport, OH
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Airport, OH AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class D airspace at Rickenbacker International Airport, Columbus, OH. Changes to the airspace description are necessary due to the closure of South Columbus Airport. The FAA is taking this action to...
78 FR 61937 - Safety Zone; Port of Galveston, Pelican Island Bridge Repair
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-07
... Zone; Port of Galveston, Pelican Island Bridge Repair AGENCY: Coast Guard, DHS. ACTION: Temporary final... safety during the Pelican Island Bridge Repair Project. This action is necessary to protect public... barge will be placed under the Pelican Island Bridge; therefore immediate action is needed to protect...
78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... on Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT... actions relate to the proposed Mitchell River Bridge (Bridge Street over the Mitchell River) Replacement...). A claim seeking judicial review of the Federal agency actions on the bridge project will be barred...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham and Sam Marutzky
2011-07-01
This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flatmore » CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).« less
DOSE-RATE DEPENDENCE OF INSTANTANEOUS PHYSIOLOGICAL RADIATION EFFECTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hug, O.
Nastic movements in Mimosa pudica were induced by x radiation. Using short radiation impulses of 10 to 30 sec and doses up to 120 kr/min, the leaflets were observed to close and the stem to bend in the main joint during the first minute. After irradiation of parts of the leaflet, the reaction spreads along the physiological pathways as in any other stimulus. When the action potential is completed, slow depolarization continues and reaches a maximum, finally returning to the initial value in about two hr. The effect was found to be dose- dependent. It is hypothesized that either amore » direct physicochemical change of the cell membrane or a damage of substances which influence the function of the cell membrane is induced by the irradiation. (H.M.G.)« less
SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund)
The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a selected set of non-enforcement confidential information and is updated by the regions every 90 days. The data describes what has happened at Superfund sites prior to this quarter (updated quarterly). This database includes lists of involved parties (other Federal Agencies, states, and tribes), Human Exposure and Ground Water Migration, and Site Wide Ready for Reuse, Construction Completion, and Final Assessment Decision (GPRA-like measures) for fund lead sites. Other information that is included has been included only as a service to allow public evaluations utilizing this data. EPA does not have specific Data Quality Objectives for use of the data. Independent Quality Assessments may be made of this data by reviewing the Quality Assurance Action Plan (QAPP).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Younkin, James R.; Garner, James R.
2017-04-01
Over the last five years, OLEM has been a collaborative development effort involving the IAEA, LANL, ORNL, URENCO, and the NNSA. The collective team has completed the following: design and modelling, software development, hardware integration, testing with the ORNL UF6 Flow Loop, a field trial at the Urenco facility in Almelo, the Netherlands, and a Demonstration at the Urenco USA facility in Eunice, New Mexico. This combined effort culminated in the deployment of several OLEM collection nodes in Iran. These OLEM units are one unattended monitoring system component of the Joint Comprehensive Plan of Action allowing the International Atomic Energymore » Agency to verify Iran’s compliance with the enrichment production aspects of the agreement.« less
Prompt payment depends on revenue-cycle diligence.
Barber, Robert L
2002-12-01
How effectively you manage the revenue cycle is reflected in the cycle's outcome-whether you receive full and timely payment for all services billed to payers. To ensure prompt and full payment, you should: Educate your patient financial services (PFS) staff on all relevant laws and regulations regarding payment for healthcare services. Make sure your staff is well versed in all of the provisions of your payer contracts. Implement a state-of-the-art patient accounting system that is capable of producing drill-down reports of all aspects of contract performance by payer. Enforce payer compliance by maintaining complete records of dates of service, final billing dates, dates claims were mailed or electronically submitted to the payer, all actions performed by your staff regarding claims, and all communications with the payer.
Final consolidated action plan to Tiger Team. Volume 1, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Final consolidated action plan to Tiger Team. Volume 2, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
A manuscript summarizes a workshop aimed at developing a framework to determine the relevancy of animal modes-of-action for extrapolation to humans. A complete mode of action human relevance analysis - as distinct from mode of action (MOA) analysis alone - depends on robust info...
10 CFR 110.113 - Commission action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Commission action. 110.113 Section 110.113 Energy NUCLEAR... Commission action. (a) Upon completion of a hearing, the Commission will issue a written opinion including... hearing issues; and (4) Take other action, as appropriate. [43 FR 21641, May 19, 1978, as amended at 64 FR...
10 CFR 110.113 - Commission action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Commission action. 110.113 Section 110.113 Energy NUCLEAR... Commission action. (a) Upon completion of a hearing, the Commission will issue a written opinion including... hearing issues; and (4) Take other action, as appropriate. [43 FR 21641, May 19, 1978, as amended at 64 FR...
75 FR 47893 - Proposed Collection; Comment Request for REG-111583-07, (T.D. 9405) (Final)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
...-111583-07, (T.D. 9405) (Final) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... comments concerning temporary and final regulations (REG-111583-07) (T.D. 9405), Employment Tax Adjustments... Adjustments. OMB Number: 1545-2097. Form Number: REG-111583-07 (T.D. 9405) (final). Abstract: This document...
76 FR 61756 - Final Guidance on Appointment of Lobbyists to Federal Boards and Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... OFFICE OF MANAGEMENT AND BUDGET Final Guidance on Appointment of Lobbyists to Federal Boards and Commissions AGENCY: Office of Management and Budget. ACTION: Notice of Final Guidance. SUMMARY: The Office of Management and Budget (OMB) is issuing final guidance to Executive Departments and agencies concerning the...
10 CFR 51.92 - Supplement to the final environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to the final environmental impact statement. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.92 Supplement to the final environmental impact statement. (a) If the proposed action has not been taken, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... in preparation of a final determination on our proposed listings and designation of critical habitat... fully consider them in preparation of the final rules. DATES: The comment periods for the proposed rules... preparation of the final rules. We intend that any final actions [[Page 43123
Hepler, Justin; Albarracin, Dolores
2018-01-01
Although robust evidence indicates that action initiation can occur unconsciously and unintentionally, the literature on action inhibition suggests that inhibition requires both conscious thought and intentionality. In prior research demonstrating automatic inhibition in response to unconsciously processed stimuli, the unconscious stimuli had previously been consciously associated with an inhibitory response within the context of the experiment, and participants had consciously formed a goal to activate inhibition processes when presented with the stimuli (because task instructions required participants to engage in inhibition when the stimuli occurred). Therefore, prior work suggests that some amount of conscious thought and intentionality are required for inhibitory control. In the present research, we recorded event-related potentials during two go/no-go experiments in which participants were subliminally primed with general action/inaction concepts that had never been consciously associated with task-specific responses. We provide the first demonstration that inhibitory control processes can be modulated completely unconsciously and unintentionally. PMID:23747649
Application of OpenCV in Asus Tinker Board for face recognition
NASA Astrophysics Data System (ADS)
Chen, Wei-Yu; Wu, Frank; Hu, Chung-Chiang
2017-06-01
The rise of the Internet of Things to promote the development of technology development board, the processor speed of operation and memory capacity increases, more and more applications, can already be completed before the data on the board computing, combined with the network to sort the information after Sent to the cloud for processing, so that the front of the development board is no longer simply retrieve the data device. This study uses Asus Tinker Board to install OpenCV for real-time face recognition and capture of the face, the acquired face to the Microsoft Cognitive Service cloud database for artificial intelligence comparison, to find out what the face now represents the mood. The face of the corresponding person name, and finally, and then through the text of Speech to read the name of the name to complete the identification of the action. This study was developed using the Asus Tinker Board, which uses ARM-based CPUs with high efficiency and low power consumption, plus improvements in memory and hardware performance for the development board.
NASA Technical Reports Server (NTRS)
Petrachenko, Bill
2010-01-01
The first concrete actions toward a next generation system for geodetic VLBI began in 2003 when the IVS initiated Working Group 3 to investigate requirements for a new system. The working group set out ambitious performance goals and sketched out initial recommendations for the system. Starting in 2006, developments continued under the leadership of the VLBI2010 Committee (V2C) in two main areas: Monte Carlo simulators were developed to evaluate proposed system changes according to their impact on IVS final products, and a proof-of-concept effort sponsored by NASA was initiated to develop next generation systems and verify the concepts behind VLBI2010. In 2009, the V2C produced a progress report that summarized the conclusions of the Monte Carlo work and outlined recommendations for the next generation system in terms of systems, analysis, operations, and network configuration. At the time of writing: two complete VLBI2010 signal paths have been completed and data is being produced; a number of VLBI2010 antenna projects are under way; and a VLBI2010 Project Executive Group (V2PEG) has been initiated to provide strategic leadership.
78 FR 27 - Final Flood Elevation Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-02
...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...
75 FR 78926 - Final Flood Elevation Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...-2010-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...
77 FR 74610 - Final Flood Elevation Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...
76 FR 22106 - Issuance of Final Guidance Publication
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... NIOSH-033] Issuance of Final Guidance Publication AGENCY: National Institute for Occupational Safety and... Health and Human Services (HHS). ACTION: Notice of issuance of final guidance publication. SUMMARY: The... (CDC) announces the availability of the following publication: NIOSH Current Intelligence Bulletin 63...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.20 Section 8.20 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Disciplinary Procedure § 8.20 Final decision. Each...
78 FR 52954 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 52953 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 29763 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 45938 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 20337 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-04
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 43905 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 48882 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 14576 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 5820 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 32678 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 14318 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 9406 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-08
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 43904 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 36216 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 64521 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 36220 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 32679 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 36219 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 29761 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final notice... and FIS report are the basis of the floodplain management measures that a community is required either...
78 FR 14316 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2013-0002] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice... and FIS report are the basis of the floodplain management measures that a community is required either...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-21
... Administration (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf... meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the State Route 2...
Impairment of manual but not saccadic response inhibition following acute alcohol intoxication.
Campbell, Anne Eileen; Chambers, Christopher D; Allen, Christopher P G; Hedge, Craig; Sumner, Petroc
2017-12-01
Alcohol impairs response inhibition; however, it remains contested whether such impairments affect a general inhibition system, or whether affected inhibition systems are embedded in, and specific to, each response modality. Further, alcohol-induced impairments have not been disambiguated between proactive and reactive inhibition mechanisms, and nor have the contributions of action-updating impairments to behavioural 'inhibition' deficits been investigated. Forty Participants (25 female) completed both a manual and a saccadic stop-signal reaction time (SSRT) task before and after a 0.8g/kg dose of alcohol and, on a separate day, before and after a placebo. Blocks in which participants were required to ignore the signal to stop or make an additional 'dual' response were included to obtain measures of proactive inhibition as well as updating of attention and action. Alcohol increased manual but not saccadic SSRT. Proactive inhibition was weakly reduced by alcohol, but increases in the reaction times used to baseline this contrast prevent clear conclusions regarding response caution. Finally, alcohol also increased secondary dual response times of the dual task uniformly as a function of the delay between tasks, indicating an effect of alcohol on action-updating or execution. The modality-specific effects of alcohol favour the theory that response inhibition systems are embedded within response modalities, rather than there existing a general inhibition system. Concerning alcohol, saccadic control appears relatively more immune to disruption than manual control, even though alcohol affects saccadic latency and velocity. Within the manual domain, alcohol affects multiple types of action updating, not just inhibition. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.
Tripathy, Shreepada; Miller, Karen H; Berkenbosch, John W; McKinley, Tara F; Boland, Kimberly A; Brown, Seth A; Calhoun, Aaron W
2016-06-01
Controversy exists in the simulation community as to the emotional and educational ramifications of mannequin death due to learner action or inaction. No theoretical framework to guide future investigations of learner actions currently exists. The purpose of our study was to generate a model of the learner experience of mannequin death using a mixed methods approach. The study consisted of an initial focus group phase composed of 11 learners who had previously experienced mannequin death due to action or inaction on the part of learners as defined by Leighton (Clin Simul Nurs. 2009;5(2):e59-e62). Transcripts were analyzed using grounded theory to generate a list of relevant themes that were further organized into a theoretical framework. With the use of this framework, a survey was generated and distributed to additional learners who had experienced mannequin death due to action or inaction. Results were analyzed using a mixed methods approach. Forty-one clinicians completed the survey. A correlation was found between the emotional experience of mannequin death and degree of presession anxiety (P < 0.001). Debriefing was found to significantly reduce negative emotion and enhance satisfaction. Sixty-nine percent of respondents indicated that mannequin death enhanced learning. These results were used to modify our framework. Using the previous approach, we created a model of the effect of mannequin death on the educational and psychological state of learners. We offer the final model as a guide to future research regarding the learner experience of mannequin death.
Resisting rape: the effects of victim self-protection on rape completion and injury.
Tark, Jongyeon; Kleck, Gary
2014-03-01
The impact of victim resistance on rape completion and injury was examined utilizing a large probability sample of sexual assault incidents, derived from the National Crime Victimization Survey (1992-2002), and taking into account whether harm to the victim followed or preceded self-protection (SP) actions. Additional injuries besides rape, particularly serious injuries, following victim resistance are rare. Results indicate that most SP actions, both forceful and nonforceful, reduce the risk of rape completion, and do not significantly affect the risk of additional injury.
Boucher, Beatrice A; Manafò, Elizabeth; Boddy, Meaghan R; Roblin, Lynn; Truscott, Rebecca
2017-09-01
To address challenges Canadians face within their food environments, a comprehensive, multistakeholder, intergovernmental approach to policy development is essential. Food environment indicators are needed to assess population status and change. The Ontario Food and Nutrition Strategy (OFNS) integrates the food, agriculture and nutrition sectors, and aims to improve the health of Ontarians through actions that promote healthy food systems and environments. This report describes the process of identifying indicators for 11 OFNS action areas in two strategic directions (SDs): Healthy Food Access, and Food Literacy and Skills. The OFNS Indicators Advisory Group used a five-step process to select indicators: (1) potential indicators from national and provincial data sources were identified; (2) indicators were organized by SD, action area and data type; (3) selection criteria were identified, pilot tested and finalized; (4) final criteria were applied to refine the indicator list; and (5) indicators were prioritized after reapplication of selection criteria. Sixty-nine potential indicators were initially identified; however, many were individual-level rather than system-level measures. After final application of the selection criteria, one individual-level indicator and six system-level indicators were prioritized in five action areas; for six of the action areas, no indicators were available. Data limitations suggest that available data may not measure important aspects of the food environment, highlighting the need for action and resources to improve system-level indicators and support monitoring of the food environment and health in Ontario and across Canada.
14 CFR 161.415 - Reevaluation action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Reevaluation action. 161.415 Section 161.415 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... § 161.415 Reevaluation action. (a) Upon completing the reevaluation, the FAA will issue appropriate...
ER Consolidated Qtrly Rpt_July-September 2015_January 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John R.
2016-01-01
This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented by Sandia National Laboratories, New Mexico (SNL/NM) for the July, August, and September 2015 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. The work completed during this quarter is reported below in Sections I.2.1 and I.2.2. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities (SWMUs 8 and 58, 68, 149, 154, and 502, and three groundwater AOCs).more » Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) has issued a certificate of completion and the site is in the corrective action complete (CAC) regulatory process. Currently, the Mixed Waste Landfill (MWL, SWMU 76) is the only site in the CAC regulatory process. Corrective action activities have been deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these are active mission facilities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John R.
This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Areamore » [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.« less
Professional licensure: investigation and disciplinary action.
Brous, Edie
2012-11-01
This is the second article in a three-part series on nursing boards' disciplinary actions and what nurses need to know to maintain their license in good standing. This article discusses common reasons boards of nursing conduct investigations and take disciplinary action. The third and final article will discuss strategies for protecting your license.
78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... that an affirmative defense is not available in an enforcement action in Federal court to enforce the... for sources covered by those provisions: A source may assert an affirmative defense in an action..., shutdown or malfunction. Thus, the action we are finalizing in this rulemaking-- approving an affirmative...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
.... The publication of this action is part of a Court-approved joint motion to stay pending litigation...), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Final rule. SUMMARY: Through this action, NMFS removes a regulatory exemption for midwater trawl herring vessels, which was originally...
75 FR 31677 - Amendment of Class E Airspace; Austin, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
...-1152; Airspace Docket No. 09-ASW-31] Amendment of Class E Airspace; Austin, TX AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action amends Class E airspace for the Austin, TX... Procedures (SIAPs) at Austin Executive Airport, Austin, TX. The FAA is taking this action to enhance the...
Leading trends in environmental regulation that affect energy development. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steele, R V; Attaway, L D; Christerson, J A
1980-01-01
Major environmental issues that are likely to affect the implementation of energy technologies between now and the year 2000 are identified and assessed. The energy technologies specifically addressed are: oil recovery and processing; gas recovery and processing; coal liquefaction; coal gasification (surface); in situ coal gasification; direct coal combustion; advanced power systems; magnetohydrodynamics; surface oil shale retorting; true and modified in situ oil shale retorting; geothermal energy; biomass energy conversion; and nuclear power (fission). Environmental analyses of these technologies included, in addition to the main processing steps, the complete fuel cycle from resource extraction to end use. A comprehensive surveymore » of the environmental community (including environmental groups, researchers, and regulatory agencies) was carried out in parallel with an analysis of the technologies to identify important future environmental issues. Each of the final 20 issues selected by the project staff has the following common attributes: consensus of the environmental community that the issue is important; it is a likely candidate for future regulatory action; it deals with a major environmental aspect of energy development. The analyses of the 20 major issues address their environmental problem areas, current regulatory status, and the impact of future regulations. These analyses are followed by a quantitative assessment of the impact on energy costs and nationwide pollutant emissions of possible future regulations. This is accomplished by employing the Strategic Environmental Assessment System (SEAS) for a subset of the 20 major issues. The report concludes with a more general discussion of the impact of environmental regulatory action on energy development.« less
The Army Study Program, FY 1982.
1982-05-31
COMPLETED, DELETED, AND DEFERRED STUDIES (FOR THE PERIOD: 10/01/81 TO 05/31/82) STUDY TITLE SPONSOR METHOD CAT ACTION STUDY # SUBMILLIMETER MODELING...Studies and Analyses Agencies and Reference Facilities ............... C-1 Appendix D: Completed, Deleted, and Deferred Studies. ....... D-1 Appendix...understanding of relevant issues and lead to conclusions and recommendations for use by decisionmakers. The central purpose of each study is to support action
ERIC Educational Resources Information Center
Henningsen, Mary Lynn Miller; Valde, Kathleen S.; Russell, Gregory A.; Russell, Gregory R.
2011-01-01
The goals-plans-actions model and the theory of planned behavior were used to predict what lead to students having a conversation about a disappointing grade with a faculty member. Participants (N = 130) completed two surveys. In the first survey, participants completed measures of primary and secondary goals, planning, decision to engage,…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
... EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities: Submission for OMB Review; Final Comment Request AGENCY: Equal Employment Opportunity Commission. ACTION: Final... Reduction Act of 1995, the Equal Employment Opportunity Commission (Commission or EEOC) gives notice that it...
78 FR 79613 - Final Requirement-Migrant Education Program Consortium Incentive Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... DEPARTMENT OF EDUCATION 34 CFR Chapter II [CFDA Number 84.144F] Final Requirement--Migrant Education Program Consortium Incentive Grant Program AGENCY: Office of Elementary and Secondary Education, Department of Education. ACTION: Final requirement. SUMMARY: The Assistant Secretary for Elementary and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... Final EIS: Biological resources, cultural resources, water resources, land use, socioeconomic resources... INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO United States Section..., International Boundary and Water Commission (USIBWC). ACTION: Notice of Availability of Final Environmental...
Linking Actions and Emotions: Evidence from 15- and 18-Month-Old Infants
ERIC Educational Resources Information Center
Repacholi, Betty M.
2009-01-01
This study investigated 15- and 18-month-olds' understanding of the link between actions and emotions. Infants watched a videotape in which three adult models performed an action on an object. Each adult expressed the same emotion (positive, negative, or neutral affect) on completion of the action. Infants were subsequently given 20 seconds to…
Persistence and Graduation of UC Davis Undergraduates Admitted by Special Action: 1975-1985.
ERIC Educational Resources Information Center
Hunziker, Celeste M.
Persistence and graduation rates of University of California, Davis, special action students admitted in any fall quarter from 1975 to 1985 were studied. Special action students show academic potential but do not meet admission requirements of completed course work and academic achievement. The number of special action students during this 10-year…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 2.6-acre Novaco Industries site is a one building site in Temperance, Michigan. Land use in the area is predominantly residential and agricultural. The estimated 85 residences located within 1/2 mile of the site use the underlying sand/gravel and limestone aquifer as their drinking water supply. A 1986 Record of Decision (ROD) addressed a final remedy for ground water contamination and provided for ground water pumping and treatment using electrochemical reduction/ion exchange polishing, followed by onsite discharge to surface water. The ROD amends the 1986 ROD. The amended remedial action for the site is no further action.
75 FR 3205 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
... Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of public meeting. SUMMARY: The... regulations with some initial reactions which the drafters may take into account as they complete the draft... subcommittee action during this meeting. Joint subcommittee action will be restricted to those issues...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... demolition activities, substantial excavation and grading, installation of a geohazard soil stabilization... human environment. The No-Action Alternative was analyzed and assumes the newly proposed actions would...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XC726 Final NOAA... Native Corporations AGENCY: National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of Final Handbook. SUMMARY: In compliance with Executive Order (E.O.) 13175, ``Consultation and...
75 FR 61175 - Polyvinyl Alcohol From Taiwan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1088 (Final)] Polyvinyl Alcohol From Taiwan AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase of an... antidumping investigation No. 731-TA-1088 (Final) under section 735(b) of the Tariff Act of 1930 (19 U.S.C...
78 FR 29760 - Final Flood Hazard Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... accordance with section 110 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, and 44 CFR part 67...] Final Flood Hazard Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final Notice. SUMMARY: Flood hazard determinations, which may include additions or modifications of Base Flood...
This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.
CSAPR June Revisions Rule (77 FR 34830)
EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).
Participation in online continuing education.
Farrell, Barbara; Ward, Natalie; Jennings, Brad; Jones, Caitlin; Jorgenson, Derek; Gubbels-Smith, Ashley; Dolovich, Lisa; Kennie, Natalie
2016-02-01
The ADAPT (ADapting pharmacists' skills and Approaches to maximize Patients' drug Therapy effectiveness) e-learning programme requires weekly participation in module activities and facilitated discussion to support skill uptake. In this study, we sought to describe the extent and pattern of, satisfaction with and factors affecting participation in the initial programme offering and reasons for withdrawal. Mixed methods - convergent parallel approach. Participation was examined in qualitative data from discussion boards, assignments and action plans. Learner estimations of time commitment and action plan submission rates were calculated. Surveys (Likert scale and open-ended questions) included mid-point and final, exit and participation surveys. Eleven of 86 learners withdrew, most due to time constraints (eight completed an exit survey; seven said they would take ADAPT again). Thirty-five of 75 remaining learners completed a participation survey. Although 50-60% of the remaining 75 learners actively continued participating, only 15/35 respondents felt satisfied with their own participation. Learners spent 3-5 h/week (average) on module activities. Factors challenging participation included difficulty with technology, managing time and group work. Factors facilitating participation included willingness to learn (content of high interest) and supportive work environment. Being informed of programme time scheduling in advance was identified as a way to enhance participation. This study determined extent of learner participation in an online pharmacist continuing education programme and identified factors influencing participation. Interactions between learners and the online interface, content and with other learners are important considerations for designing online education programmes. Recommendations for programme changes were incorporated following this evaluation to facilitate participation. © 2015 Royal Pharmaceutical Society.
Restoration and repair of Earth's damaged ecosystems.
Jones, Holly P; Jones, Peter C; Barbier, Edward B; Blackburn, Ryan C; Rey Benayas, Jose M; Holl, Karen D; McCrackin, Michelle; Meli, Paula; Montoya, Daniel; Mateos, David Moreno
2018-02-28
Given that few ecosystems on the Earth have been unaffected by humans, restoring them holds great promise for stemming the biodiversity crisis and ensuring ecosystem services are provided to humanity. Nonetheless, few studies have documented the recovery of ecosystems globally or the rates at which ecosystems recover. Even fewer have addressed the added benefit of actively restoring ecosystems versus allowing them to recover without human intervention following the cessation of a disturbance. Our meta-analysis of 400 studies worldwide that document recovery from large-scale disturbances, such as oil spills, agriculture and logging, suggests that though ecosystems are progressing towards recovery following disturbances, they rarely recover completely. This result reinforces conservation of intact ecosystems as a key strategy for protecting biodiversity. Recovery rates slowed down with time since the disturbance ended, suggesting that the final stages of recovery are the most challenging to achieve. Active restoration did not result in faster or more complete recovery than simply ending the disturbances ecosystems face. Our results on the added benefit of restoration must be interpreted cautiously, because few studies directly compared different restoration actions in the same location after the same disturbance. The lack of consistent value added of active restoration following disturbance suggests that passive recovery should be considered as a first option; if recovery is slow, then active restoration actions should be better tailored to overcome specific obstacles to recovery and achieve restoration goals. We call for a more strategic investment of limited restoration resources into innovative collaborative efforts between scientists, local communities and practitioners to develop restoration techniques that are ecologically, economically and socially viable. © 2018 The Author(s).
Restoration and repair of Earth's damaged ecosystems
Jones, Peter C.; Barbier, Edward B.; Blackburn, Ryan C.; Rey Benayas, Jose M.; Holl, Karen D.; McCrackin, Michelle; Meli, Paula; Montoya, Daniel; Mateos, David Moreno
2018-01-01
Given that few ecosystems on the Earth have been unaffected by humans, restoring them holds great promise for stemming the biodiversity crisis and ensuring ecosystem services are provided to humanity. Nonetheless, few studies have documented the recovery of ecosystems globally or the rates at which ecosystems recover. Even fewer have addressed the added benefit of actively restoring ecosystems versus allowing them to recover without human intervention following the cessation of a disturbance. Our meta-analysis of 400 studies worldwide that document recovery from large-scale disturbances, such as oil spills, agriculture and logging, suggests that though ecosystems are progressing towards recovery following disturbances, they rarely recover completely. This result reinforces conservation of intact ecosystems as a key strategy for protecting biodiversity. Recovery rates slowed down with time since the disturbance ended, suggesting that the final stages of recovery are the most challenging to achieve. Active restoration did not result in faster or more complete recovery than simply ending the disturbances ecosystems face. Our results on the added benefit of restoration must be interpreted cautiously, because few studies directly compared different restoration actions in the same location after the same disturbance. The lack of consistent value added of active restoration following disturbance suggests that passive recovery should be considered as a first option; if recovery is slow, then active restoration actions should be better tailored to overcome specific obstacles to recovery and achieve restoration goals. We call for a more strategic investment of limited restoration resources into innovative collaborative efforts between scientists, local communities and practitioners to develop restoration techniques that are ecologically, economically and socially viable. PMID:29491171
Nori, Francesco; Frezza, Ruggero
2005-11-01
Recent experiments on frogs and rats, have led to the hypothesis that sensory-motor systems are organized into a finite number of linearly combinable modules; each module generates a motor command that drives the system to a predefined equilibrium. Surprisingly, in spite of the infiniteness of different movements that can be realized, there seems to be only a handful of these modules. The structure can be thought of as a vocabulary of "elementary control actions". Admissible controls, which in principle belong to an infinite dimensional space, are reduced to the linear vector space spanned by these elementary controls. In the present paper we address some theoretical questions that arise naturally once a similar structure is applied to the control of nonlinear kinematic chains. First of all, we show how to choose the modules so that the system does not loose its capability of generating a "complete" set of movements. Secondly, we realize a "complete" vocabulary with a minimal number of elementary control actions. Subsequently, we show how to modify the control scheme so as to compensate for parametric changes in the system to be controlled. Remarkably, we construct a set of modules with the property of being invariant with respect to the parameters that model the growth of an individual. Robustness against uncertainties is also considered showing how to optimally choose the modules equilibria so as to compensate for errors affecting the system. Finally, the motion primitive paradigm is extended to locomotion and a related formalization of internal (proprioceptive) and external (exteroceptive) variables is given.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
...This action finalizes the residual risk and technology review conducted for two industrial source categories regulated by separate national emission standards for hazardous air pollutants. The two national emission standards for hazardous air pollutants are: National Emissions Standards for Shipbuilding and Ship Repair (Surface Coating) and National Emissions Standards for Wood Furniture Manufacturing Operations. This action also finalizes revisions to the regulatory provisions related to emissions during periods of startup, shutdown and malfunction.
Cheng, Yue-Fa; Zhu, Guoqi; Wu, Qing-Wen; Xie, Yue-Sheng; Jiang, Yan; Guo, Lan; Guan, Ya-Li; Liu, Ying-Shuo; Zhang, Jun
2017-02-01
The neuroprotective action of puerarin in Parkinson's disease (PD) models has been well investigated. However, the mechanisms involved in protection have not been completely understood. G protein-coupled receptor 30 (GPR30) is a G protein-coupled estrogen receptor and considered a potential target in the neuroprotection against PD. In this study, we investigated whether puerarin prevented against 1-methyl-4-phenylpyridinium (MPP + )-induced cell death via GPR30. Our results showed that the GPR30 agonist, G1, exhibited puerarin-mediated neuroprotection against MPP + -induced cell death of SH-SY5Y cells. This protective action was reversed by the GPR30 antagonist. Moreover, a time- and concentration-dependent effect of puerarin on GPR30 expression was verified at the protein level but not at the mRNA level. Further, we showed that an mTor-dependent new GPR30 synthesis contributed to the protection conferred by puerarin. Finally, glial cell line-derived neurotrophic factor (GDNF) levels were enhanced by puerarin and G1 in both control and MPP + -lesioned cells via GPR30. Taken together, our data strongly suggest that puerarin prevents MPP + -induced cell death via facilitating GPR30 expression and GDNF release.
Cooperative action of KIF1A Brownian motors with finite dwell time
NASA Astrophysics Data System (ADS)
Oriola, David; Casademunt, Jaume
2014-03-01
We study in detail the cooperative action of small groups of KIF1A motors in its monomeric (single-headed) form within an arrangement relevant to vesicle traffic or membrane tube extraction. It has been recently shown that under these circumstances, the presence of a finite dwell time in the motor cycle contributes to remarkably enhance collective force generation [D. Oriola and J. Casademunt, Phys. Rev. Lett. 111, 048103 (2013), 10.1103/PhysRevLett.111.048103]. We analyze this mechanism in detail by means of a two-state noise-driven ratchet model with hard-core repulsive interactions. We obtain staircase-shaped velocity-force curves and show that motors self-organize in clusters with a nontrivial force distribution that conveys a large part of the load to the central motors. Under heavy loads, large clusters adopt a synchronic mode of totally asymmetric steps. We also find a dramatic increase of the collective efficiency with the number of motors. Finally, we complete the study by addressing different interactions that impose spatial constraints such as rigid coupling and raft-induced confinement. Our results reinforce the hypothesis that the specificity of KIF1A to axonal vesicular transport may be deeply related to its high cooperativity.