Sample records for components installation requirements

  1. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  2. 30 CFR 75.1103-2 - Automatic fire sensors; approved components; installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Automatic fire sensors; approved components... Protection § 75.1103-2 Automatic fire sensors; approved components; installation requirements. (a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75...

  3. 30 CFR 75.1103-2 - Automatic fire sensors; approved components; installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Automatic fire sensors; approved components... Protection § 75.1103-2 Automatic fire sensors; approved components; installation requirements. (a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75...

  4. 30 CFR 75.1103-2 - Automatic fire sensors; approved components; installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Automatic fire sensors; approved components... Protection § 75.1103-2 Automatic fire sensors; approved components; installation requirements. (a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75...

  5. 30 CFR 75.1103-2 - Automatic fire sensors; approved components; installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Automatic fire sensors; approved components... Protection § 75.1103-2 Automatic fire sensors; approved components; installation requirements. (a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75...

  6. 30 CFR 75.1103-2 - Automatic fire sensors; approved components; installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Automatic fire sensors; approved components... Protection § 75.1103-2 Automatic fire sensors; approved components; installation requirements. (a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75...

  7. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of water sprinkler systems...

  8. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of water sprinkler systems...

  9. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of water sprinkler systems...

  10. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of water sprinkler systems...

  11. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of water sprinkler systems... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the...

  12. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  13. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  14. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  15. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other propulsion system. D417.5Flight termination system design (a) Reliability prediction. A flight... design margin required by this appendix. As an alternative to subjecting the flight termination system to... the component is heated or cooled to achieve the required dwell time at one extreme of the required...

  16. China SLAT Plan Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dietrich, Richard E.

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  17. 77 FR 11791 - Airworthiness Directives; Saab AB, Saab Aerosystems Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... installation wiring. For the reasons described above, this [EASA] AD requires a one- time [detailed] inspection... installation, and if corrosion is found repairing each affected harness braid or replacing each affected component and/or wiring harness. We are proposing this AD to detect and correct corrosion of critical system...

  18. 77 FR 29855 - Airworthiness Directives; Saab AB, Saab Aerosystems Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... electronic installation wiring. For the reasons described above, this [EASA] AD requires a one- time... corrosion of the electrical and electronics installation, and if corrosion is found repairing each affected harness braid or replacing each affected component and/or wiring harness. We are issuing this AD to detect...

  19. 46 CFR 162.060-30 - Testing requirements for ballast water management system (BWMS) components.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... production configuration: (1) A resonance search vertically up and down, horizontally from side to side, and...) Components that may be installed in enclosed spaces that are environmentally controlled, including an engine...

  20. 46 CFR 162.060-30 - Testing requirements for ballast water management system (BWMS) components.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... production configuration: (1) A resonance search vertically up and down, horizontally from side to side, and...) Components that may be installed in enclosed spaces that are environmentally controlled, including an engine...

  1. Measurement component technology. Volume 1: Cryogenic pressure measurement technology, high pressure flange seals, hydrogen embrittlement of pressure transducer material, close coupled versus remote transducer installation and temperature compensation of pressure transducers

    NASA Technical Reports Server (NTRS)

    Hayakawa, K. K.; Udell, D. R.; Iwata, M. M.; Lytle, C. F.; Chrisco, R. M.; Greenough, C. S.; Walling, J. A.

    1972-01-01

    The results are presented of an investigation into the availability and performance capability of measurement components in the area of cryogenic temperature, pressure, flow and liquid detection components and high temperature strain gages. In addition, technical subjects allied to the components were researched and discussed. These selected areas of investigation were: (1) high pressure flange seals, (2) hydrogen embrittlement of pressure transducer diaphragms, (3) The effects of close-coupled versus remote transducer installation on pressure measurement, (4) temperature transducer configuration effects on measurements, and (5) techniques in temperature compensation of strain gage pressure transducers. The purpose of the program was to investigate the latest design and application techniques in measurement component technology and to document this information along with recommendations for upgrading measurement component designs for future S-2 derivative applications. Recommendations are provided for upgrading existing state-of-the-art in component design, where required, to satisfy performance requirements of S-2 derivative vehicles.

  2. 11. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Interior view of control room in Components Test Laboratory (T-27), looking north. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  3. 40 CFR 1060.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... specify the requirements for the fuel cap, such as the allowable materials, thread pattern, how it must... liquid fuel. (4) Describe instructions for installing components so they will operate according to design... equivalent format. For example, you may post instructions on a publicly available Web site for downloading or...

  4. Superfund Record of Decision (EPA Region 3): Allegany Ballistics Laboratory (USNavy), Operable Unit 1, Mineral, WV, February 12, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    This decision document presents the selected remedial action for Site 5 Landfill Contents and Surface Soil at the Allegany Ballistics Laboratory (ABL), Rocket Center, West Virginia. The major components of the selected remedy are: Deed notation along with property use and limited access restrictions; Installation of a composite CAP-GCL and FMC; Installation of a drainage layer utilizing a geonet; Installation of a passive landfill gas (LFG) venting system; Revegetation of the capped area; Installation of perimeter drainage system; and Post-closure requirements.

  5. 30 CFR 75.1107-3 - Fire suppression devices; approved components; installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-3... agency approved by the Secretary. (b) Where used, pressure vessels shall conform with the requirements of...

  6. 30 CFR 75.1107-3 - Fire suppression devices; approved components; installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-3... agency approved by the Secretary. (b) Where used, pressure vessels shall conform with the requirements of...

  7. 30 CFR 75.1107-3 - Fire suppression devices; approved components; installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-3... agency approved by the Secretary. (b) Where used, pressure vessels shall conform with the requirements of...

  8. 30 CFR 75.1107-3 - Fire suppression devices; approved components; installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-3... agency approved by the Secretary. (b) Where used, pressure vessels shall conform with the requirements of...

  9. 30 CFR 75.1107-3 - Fire suppression devices; approved components; installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-3... agency approved by the Secretary. (b) Where used, pressure vessels shall conform with the requirements of...

  10. 17. Interior view of Test Cell 8 (oxidizer) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Interior view of Test Cell 8 (oxidizer) in Components Test Laboratory (T-27), showing west and north walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  11. 14. Interior view of Test Cell 10 (environmental) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Interior view of Test Cell 10 (environmental) in Components Test Laboratory (T-27), showing east and south walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  12. 18. Interior view of HVAC room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Interior view of HVAC room in Components Test Laboratory (T-27), showing northwest corner. Photograph shows upgraded instrumentation, piping, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  13. 19. Interior view of HVAC room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Interior view of HVAC room in Components Test Laboratory (T-27), looking toward east wall. Photograph shows upgraded instrumentation, machinery, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  14. 3D laser scanning for quality control and assurance in bridge deck construction.

    DOT National Transportation Integrated Search

    2014-08-01

    The inspection of installations of rebar and other embedded components in bridge deck construction is a tedious : task for eld inspectors, requiring considerable eld time for measurement and verication against code requirement. The verica...

  15. 49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2012-10-01 2012-10-01 false Required capacity of pressure relieving and...

  16. 49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2011-10-01 2011-10-01 false Required capacity of pressure relieving and...

  17. 49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2013-10-01 2013-10-01 false Required capacity of pressure relieving and...

  18. 49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2014-10-01 2014-10-01 false Required capacity of pressure relieving and...

  19. Fabrication and installation of the Solar Two central receiver

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Litwin, R.Z.; Rogers, R.D.

    The heart of the Solar Two power plant is the molten salt central receiver that has been designed, fabricated, and installed over an 18 month schedule. During this time, the receiver system from Solar One was also completely disassembled and removed. The receiver tower structure, for the most part, was left intact because Solar Two was designed to fit this structure such that construction time and costs could be minimized. In order to meet this aggressive schedule, receiver panel fabrication required the parallel production of many components. The sequence for assembly of the four major receiver panel components (i.e., tubes,more » header assembly, strongback, and header oven covers) and key fabrication activities such as welding are described. Once the receiver panels were complete, their installation at the site was begun, and the order in which receiver system components were installed in the tower is described. The completion of the Solar Two receiver proved the fabricability of this important system. However, successful operation of the system at Solar Two is needed to demonstrate the technical feasibility of the molten salt central receiver concept.« less

  20. 78 FR 27318 - Airworthiness Directives; Bombardier, Inc. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... report of corrosion of the components of the main landing gear (MLG) retraction actuator found in service... pins. This proposed AD would require inspection of the MLG retraction actuator components; corrective actions if necessary; and, for certain retraction actuators, installation of a new jam nut. We are...

  1. 78 FR 51055 - Airworthiness Directives; Bombardier, Inc. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... a report of corrosion of the components of the main landing gear (MLG) retraction actuator found in... related pins. This AD requires inspection of the MLG retraction actuator components; corrective actions if necessary; and, for certain retraction actuators, installation of a new jam nut. We are issuing this AD to...

  2. 46 CFR 58.30-35 - Testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...

  3. 46 CFR 58.30-35 - Testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...

  4. 46 CFR 58.30-35 - Testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...

  5. 46 CFR 58.30-35 - Testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...

  6. 46 CFR 58.30-35 - Testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...

  7. 12. Interior view of Test Cell 9 (fuel) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Interior view of Test Cell 9 (fuel) in Components Test Laboratory (T-27), showing north and east walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  8. 46 CFR 182.480 - Flammable vapor detection systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.480 Flammable vapor... permit calibration in a vapor free atmosphere. (g) Electrical connections, wiring, and components for a...

  9. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel pumps. 23.991 Section 23.991...

  10. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel pumps. 23.991 Section 23.991...

  11. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel pumps. 23.991 Section 23.991...

  12. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel pumps. 23.991 Section 23.991...

  13. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel pumps. 23.991 Section 23.991...

  14. 16. Interior view of Test Cell 8 (oxidizer) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Interior view of Test Cell 8 (oxidizer) in Components Test Laboratory (T-27), showing east wall. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. The windows in the wall enable personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  15. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the public. (c) Redundancy. A flight termination system must use redundant components that are... linear shaped charge need not be redundant if it initiates at both ends, and the initiation source for... period of heating or cooling. Paragraphs (c)(2) through (c)(6) of this section identify the required...

  16. 20. Interior view of fuel storage pit or vault adjacent ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Interior view of fuel storage pit or vault adjacent to Test Cell 9 in Component Test Laboratory (T-27), looking west. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  17. 13. Interior view of Test Cell 9 (fuel) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Interior view of Test Cell 9 (fuel) in Components Test Laboratory (T-27), showing west and north walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. Two windows in the wall to the left enable personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  18. 15. Interior view of Test Cell 10 (environmental) in Components ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior view of Test Cell 10 (environmental) in Components Test Laboratory (T-27), showing north and east walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. The window in the wall to the left enables personnel in the control room to observe component testing in the cell. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  19. 21. Interior view of citric acid air pollution control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  20. Power Supply Changes for NSTX Resistive Wall Mode Coils

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramakrishnan, S S.

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils needmore » fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.« less

  1. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Wiring of boat winch components. 111.95-7 Section 111.95... SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  2. 16 CFR 1211.10 - Requirements for all entrapment protection devices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... adjacent terminal. (c) Splash test. (1) An external entrapment protection device intended to be installed... such a manner most likely to cause water to splash the enclosure of electric components. However, the...

  3. 16 CFR 1211.10 - Requirements for all entrapment protection devices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... adjacent terminal. (c) Splash test. (1) An external entrapment protection device intended to be installed... such a manner most likely to cause water to splash the enclosure of electric components. However, the...

  4. 16 CFR 1211.10 - Requirements for all entrapment protection devices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... adjacent terminal. (c) Splash test. (1) An external entrapment protection device intended to be installed... such a manner most likely to cause water to splash the enclosure of electric components. However, the...

  5. 16 CFR § 1211.10 - Requirements for all entrapment protection devices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... adjacent terminal. (c) Splash test. (1) An external entrapment protection device intended to be installed... such a manner most likely to cause water to splash the enclosure of electric components. However, the...

  6. North American Board of Certified Energy Practitioners Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, Richard

    The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less

  7. 49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... part of the pipeline or distribution system in excess of those for which it was designed, or against...

  8. 10. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  9. Measure Guideline: Guidance on Taped Insulating Sheathing Drainage Planes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grin, A.; Lstiburek, J.

    The goal of this research is to provide durable and long-term water management solutions using exterior insulating sheathing as part of the water management system. It is possible to tape or seal the joints in insulating sheathing to create a drainage plane and even an air control layer. There exists the material durability component of the tape as well as the system durability component being the taped insulating sheathing as the drainage plane. This measure guideline provides best practice and product recommendations from the interviewed contractors and homebuilders who collectively have a vast amount of experience. Three significant issues weremore » discussed with the group, which are required to make taped insulating sheathing a simple, long-term, and durable drainage plane: horizontal joints should be limited or eliminated wherever possible; where a horizontal joint exists use superior materials; and frequent installation inspection and regular trade training are required to maintain proper installation.« less

  10. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

  11. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

  12. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  13. J-2X installation on A-1

    NASA Image and Video Library

    2007-09-20

    Core components of the J-2X engine being designed for NASA's Constellation Program recently were installed on the A-1 Test Stand at NASA's Stennis Space Center near Bay St. Louis, Miss. Tests of the components, known as Powerpack 1A, will be conducted from November 2007 through February 2008. The Powerpack 1A test article consists of a gas generator and engine turbopumps originally developed for the Apollo Program that put Americans on the moon in the late 1960s and early 1970s. Engineers are testing these heritage components to obtain data that will help them modify the turbomachinery to meet the higher performance requirements of the Ares I and Ares V launch vehicles. The upcoming tests will simulate inlet and outlet conditions that would be present on the turbomachinery during a full-up engine hot-fire test.

  14. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  15. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  16. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  17. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  18. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  19. MAP Propulsion System Thermal Design

    NASA Technical Reports Server (NTRS)

    Mosier, Carol L.

    2003-01-01

    The propulsion system of the Microwave Anisotropy Probe (MAP) had stringent requirements that made the thermal design unique. To meet instrument stability requirements the system had to be designed to keep temperatures of all components within acceptable limits without heater cycling. Although the spacecraft remains at a fixed 22 sun angle at L2, the variations in solar constant, property degradation, and bus voltage range all significantly affect the temperature. Large portions of the fuel lines are external to the structure and all components are mounted to non-conductive composite structure. These two facts made the sensitivity to the MLI effective emissivity and bus temperature very high. Approximately two years prior to launch the propulsion system was redesigned to meet MAP requirements. The new design utilized hardware that was already installed in order to meet schedule constraints. The spacecraft design and the thermal requirements were changed to compensate for inadequacies of the existing hardware. The propulsion system consists of fuel lines, fill and drain lines/valve, eight thrusters, a HXCM, and a propulsion tank. A voltage regulator was added to keep critical components within limits. Software was developed to control the operational heaters. Trim resistors were put in series with each operational heater circuits and the tank survival heater. A highly sophisticated test program, which included real time model correlation, was developed to determine trim resistors sizes. These trim resistors were installed during a chamber break and verified during thermal balance testing.

  20. Installation and assembly device and method of using

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolsun, G.J.

    1995-12-31

    The present invention relates to an installation and assembly device and method for facilitating the fitup of mating components during blind or remote installation and assembly, especially where close fitup tolerances are involved. The present invention is particularly useful for the purpose of facilitating vertical and/or radial relative positioning of a pump impeller within a mating inlet nozzle during a blind assembly wherein actual fitup cannot be observed during installation. The information within identifies just one successful application of the installation and assembly alignment device for a pump. The device, however, is not solely limited to pump assembly but canmore » be used in other cases where fitup of a sleeve inside a mating bore is required under conditions of close tolerance during a blind or remote assembly. The device is likewise not limited to circular configurations but can be used for many other shapes or configurations. Any material that can be machined and hold reasonably close tolerances can be used for the device. Also, because the sleeve position is adjusted by set screws or bolts, the concentricity can be radially biased, if required, to achieve particular alignment conditions.« less

  1. Desulfurization of gasoline.

    PubMed Central

    Berger, J E

    1975-01-01

    Although gasoline blending streams exhibit widely varying sulfur concentrations, significant quantities of low-sulfur motor gasoline cannot be manufactured by reallocation of existing components without substantial sacrifices in the useful properties of the remaining fuels having normal sulfur levels. To meet the anticipated demand for low-sulfur unleaded gasoline which may be required for catalyst-equipped automobiles it will be necessary to install process equipment based on known hydrotreating technology. The effects which this construction program would exert on the activities, abilities and needs of one petroleum refiner are sketched for two degrees of sulfur removal. The impacts of installing the process facilities which would be necessary are discussed in terms of time requirements, capital needs, and added energy expenditures. PMID:1157782

  2. Orbit Transfer Vehicle (OTV) advanced expander cycle engine point design study, volume 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The engine requirements are emphasized and include: high specific impulse within a restricted installed length constraint, long life, multiple starts, different thrust levels, and man-rated reliability. The engine operating characteristics and the major component analytical design are summarized.

  3. Global search tool for the Advanced Photon Source Integrated Relational Model of Installed Systems (IRMIS) database.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Quock, D. E. R.; Cianciarulo, M. B.; APS Engineering Support Division

    2007-01-01

    The Integrated Relational Model of Installed Systems (IRMIS) is a relational database tool that has been implemented at the Advanced Photon Source to maintain an updated account of approximately 600 control system software applications, 400,000 process variables, and 30,000 control system hardware components. To effectively display this large amount of control system information to operators and engineers, IRMIS was initially built with nine Web-based viewers: Applications Organizing Index, IOC, PLC, Component Type, Installed Components, Network, Controls Spares, Process Variables, and Cables. However, since each viewer is designed to provide details from only one major category of the control system, themore » necessity for a one-stop global search tool for the entire database became apparent. The user requirements for extremely fast database search time and ease of navigation through search results led to the choice of Asynchronous JavaScript and XML (AJAX) technology in the implementation of the IRMIS global search tool. Unique features of the global search tool include a two-tier level of displayed search results, and a database data integrity validation and reporting mechanism.« less

  4. HTS Transmission Cable System for installation in the Long Island Power Grid

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmidt, Frank; Durand, Fabien; Maguire, James

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2more » and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.« less

  5. Influence of forces acting on side of machine on precision machining of large diameter holes

    NASA Astrophysics Data System (ADS)

    Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.

    2018-03-01

    One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.

  6. 14 CFR 1203a.105 - Implementation by field and component installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Implementation by field and component installations. 1203a.105 Section 1203a.105 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA SECURITY AREAS § 1203a.105 Implementation by field and component installations. If a Director of a...

  7. 40 CFR 205.169 - Labeling requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standard) dBA for the following motorcycles: (list of model specific codes). Installation of this exhaust... designed and marketed for motorcycles, and tested in accordance with § 205.168 as a constituent of a complete exhaust system comprising non-original equipment components (other than itself), as provided for...

  8. 40 CFR 205.169 - Labeling requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standard) dBA for the following motorcycles: (list of model specific codes). Installation of this exhaust... designed and marketed for motorcycles, and tested in accordance with § 205.168 as a constituent of a complete exhaust system comprising non-original equipment components (other than itself), as provided for...

  9. 49 CFR 107.502 - General registration requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... one or more tanks or cargo tanks on a motor vehicle or to a motor vehicle suspension component; (ii... MATERIALS PROGRAM PROCEDURES Registration of Cargo Tank and Cargo Tank Motor Vehicle Manufacturers... the certification of the cargo tank motor vehicle; or (iii) The installation of linings, coatings, or...

  10. An efficient approach to the deployment of complex open source information systems

    PubMed Central

    Cong, Truong Van Chi; Groeneveld, Eildert

    2011-01-01

    Complex open source information systems are usually implemented as component-based software to inherit the available functionality of existing software packages developed by third parties. Consequently, the deployment of these systems not only requires the installation of operating system, application framework and the configuration of services but also needs to resolve the dependencies among components. The problem becomes more challenging when the application must be installed and used on different platforms such as Linux and Windows. To address this, an efficient approach using the virtualization technology is suggested and discussed in this paper. The approach has been applied in our project to deploy a web-based integrated information system in molecular genetics labs. It is a low-cost solution to benefit both software developers and end-users. PMID:22102770

  11. Shaft Seal Compensates for Cold Flow

    NASA Technical Reports Server (NTRS)

    Myers, W. N.; Hein, L. A.

    1985-01-01

    Seal components easy to install. Ring seal for rotating or reciprocating shafts spring-loaded to compensate for slow yielding (cold flow) of sealing material. New seal relatively easy to install because components preassembled, then installed in one piece.

  12. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  13. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  14. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  15. 46 CFR 111.95-7 - Wiring of boat winch components.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-7 Wiring of boat winch... electric installation from all sources of potential. The switch must be in series with and on the supply...

  16. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...

  17. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...

  18. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...

  19. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...

  20. 40 CFR 264.1101 - Design and operating standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... hazardous waste (e.g., upon detection of leakage from the primary barrier) the owner or operator must: (A... constituents into the barrier, and a leak detection system that is capable of detecting failure of the primary... requirements of the leak detection component of the secondary containment system are satisfied by installation...

  1. Pilot installation for the thermo-chemical characterisation of solid wastes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marculescu, C.; Antonini, G.; Badea, A.

    The increasing production and the large variety of wastes require operators of thermal treatment units to continuously adapt the installations or the functioning parameters to the different physical and chemical properties of the wastes. Usually, the treated waste is encountered in the form of heterogeneous mixtures. The classical tests such as thermogravimetry and calorimetric bomb operate component by component, separately. In addition to this, they can analyse only small quantities of waste at a time (a few grams). These common tests are necessary but insufficient in the global waste analysis in the view further thermal treatment. This paper presents anmore » experimental installation, which was designed and built at the CNRS Science Division, Department of Industrial Methods, Compiegne University of Technology, France. It allows the determination of waste thermal and chemical properties by means of thermal treatment. Also, it is capable of continuously analysing significant quantities of waste (up to 50 kg/h) as compared to the classical tests and it can work under various conditions: {center_dot}oxidant or reductive atmosphere (on choice); {center_dot}variable temperature between 400 and 1000 deg. C; {center_dot}independently set residence time of treated sample in the installation and flow conditions. The installation reproduces the process conditions from incinerators or pyrolysis reactors. It also provides complete information on the kinetics of the waste thermal degradation and on the pollutant emissions. Using different mixtures of components present in the municipal solid waste and also in the reconstituted MSW samples, we defined a series of criteria for characterising waste behaviour during the stages of the main treatment process such as: feeding, devolatilisation/oxidation, advancement, solid residue evacuation, and pollutants emission.« less

  2. Installation guidelines for solar heating system, single-family residence at New Castle, Pennsylvania

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar heating system installer guidelines are presented for each subsystem. This single family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: (1) liquid cooled flat plate collectors; (2) water storage tank; (3) passive solar-fired domestic water preheater; (4) electric hot water heater; (5) heat pump with electric backup; (6) solar hot water coil unit; (7) tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; (8) control system; and (9) air-cooled heat purge unit. Information is provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance in the form of written descriptions, schematics, detail drawings, pictures, and manufacturer's component data.

  3. 29 CFR 1926.500 - Scope, application, and definitions applicable to this subpart.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CC of this part. (iii) Fall protection requirements for employees performing steel erection work... for training in the installation and use of fall protection systems, except in relation to steel... component parts. Load refusal is the point where the ultimate strength is exceeded. Free fall means the act...

  4. 14 CFR 25.1189 - Shutoff means.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... powerplant or engine mount structural failure. (h) Each shutoff valve must have a means to relieve excessive...) Each engine installation and each fire zone specified in § 25.1181(a)(4) and (5) must have a means to... required for— (1) Lines, fittings, and components forming an integral part of an engine; and (2) Oil...

  5. 14 CFR 25.1189 - Shutoff means.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... powerplant or engine mount structural failure. (h) Each shutoff valve must have a means to relieve excessive...) Each engine installation and each fire zone specified in § 25.1181(a)(4) and (5) must have a means to... required for— (1) Lines, fittings, and components forming an integral part of an engine; and (2) Oil...

  6. 14 CFR 25.1189 - Shutoff means.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... powerplant or engine mount structural failure. (h) Each shutoff valve must have a means to relieve excessive...) Each engine installation and each fire zone specified in § 25.1181(a)(4) and (5) must have a means to... required for— (1) Lines, fittings, and components forming an integral part of an engine; and (2) Oil...

  7. 14 CFR 25.1189 - Shutoff means.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... powerplant or engine mount structural failure. (h) Each shutoff valve must have a means to relieve excessive...) Each engine installation and each fire zone specified in § 25.1181(a)(4) and (5) must have a means to... required for— (1) Lines, fittings, and components forming an integral part of an engine; and (2) Oil...

  8. 14 CFR 25.1189 - Shutoff means.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... powerplant or engine mount structural failure. (h) Each shutoff valve must have a means to relieve excessive...) Each engine installation and each fire zone specified in § 25.1181(a)(4) and (5) must have a means to... required for— (1) Lines, fittings, and components forming an integral part of an engine; and (2) Oil...

  9. Mechanical support and transport system used for the neutrino horn system at Brookhaven National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, J.C.; Carroll, A.S.; Leonhardt, W.

    1987-01-01

    The study of neutrinos at the Alternating Gradient Synchrotron (AGS), Brookhaven National Laboratory (BNL), requires hardware for their initiation and control. The basics consist of a target, two horns and three collimators. This paper describes the installation, support and positioning of these components within a settling concrete blockhouse.

  10. NASA Procurement Career Development Program

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  11. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1980-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 6 years' service. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.

  12. Solar power satellite life-cycle energy recovery consideration

    NASA Astrophysics Data System (ADS)

    Weingartner, S.; Blumenberg, J.

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead on monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on earth (rectenna) requires about 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production installation and operation, is about two years.

  13. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    NASA Astrophysics Data System (ADS)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  14. Electricity Submetering on the Cheap: Stick-on Electricity Meters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lanzisera, Steven; Lorek, Michael; Pister, Kristofer

    2014-08-17

    We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less

  15. Physical installation of Pelletron and electron cooling system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurh, P.

    1997-09-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure areamore » and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.« less

  16. 78 FR 50489 - Petition for Exemption From the Vehicle Theft Prevention Standard; Volkswagen Group of America, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ...) petition for exemption of the Audi confidential vehicle line in accordance with 49 CFR part 543, Exemption... 2015 Audi vehicle line. The petition requested an exemption from parts- marking requirement pursuant to... the components of the antitheft device for its Audi vehicle line. Volkswagen will install its...

  17. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect the seal... sensor. (vii) At least monthly, inspect components for integrity and electrical connections for...

  18. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. You must visually inspect the seal... sensor. (vii) At least monthly, inspect components for integrity and electrical connections for...

  19. 40 CFR 1048.205 - What must I include in my application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...

  20. 40 CFR 1048.205 - What must I include in my application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...

  1. A General Purpose High Performance Linux Installation Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then usesmore » kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.« less

  2. Installing Electronics in Juno Vault

    NASA Image and Video Library

    2010-12-16

    Technicians install components that will aid with guidance, navigation and control of NASA Juno spacecraft. Like most of Juno sensitive electronics, these components are situated within the spacecraft titanium radiation vault.

  3. Discussion on the installation checking method of precast composite floor slab with lattice girders

    NASA Astrophysics Data System (ADS)

    Chen, Li; Jin, Xing; Wang, Yahui; Zhou, Hele; Gu, Jianing

    2018-03-01

    Based on the installation checking requirements of China’s current standards and the international norms for prefabricated structural precast components, it proposed an installation checking method for precast composite floor slab with lattice girders. By taking an equivalent composite beam consisted of a single lattice girder and the precast concrete slab as the checking object, compression instability stress of upper chords and yield stress of slab distribution reinforcement at the maximum positive moment, tensile yield stress of upper chords, slab normal section normal compression stress and shear instability stress of diagonal bars at the maximum negative moment were checked. And the bending stress and deflection of support beams, strength and compression stability bearing capacity of the vertical support, shear bearing capacity of the bolt and compression bearing capacity of steel tube wall at the bolt were checked at the same time. Every different checking object was given a specific load value and load combination. Application of installation checking method was given and testified by example.

  4. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  5. Latest technologies on ultrasonic cleaning

    NASA Astrophysics Data System (ADS)

    Hofstetter, Hans U.

    2007-05-01

    UCM-AG manufactures Ultrasonic Cleaning Machines for highest quality requirements. The company has the know-how for cleaning and supplies cleaning systems together with the cleaning process. With a UCM of Switzerland Cleaning System, the customer gets the system itself, the cleaning process with a guarantee for the specified result but also all auxiliary equipment needed for perfect results. Therefore UCM also supplies fixtures, linkage to existing automated fabrication facilities water treatment plants etc. Thus the UCM customer gets a turnkey installation - ready to operate and including know-how. UCM of Switzerland will describe the latest technology in ultrasonic precision cleaning on the example of a recent and sophisticated installation. The installation consists of three interlinked cleaning systems which operate completely automated. The 1st system is designed for pre-cleaning to remove waxes, pitch and protection lacquers with environmentally friendly solvents which are non hazardous to the health of the operators. The 2nd system cleans the parts prior to inspection and operates with neutral or slightly alkaline detergents. The 3rd system is designed for final cleaning prior to vacuum coating and perfect results are required. It combines cleaning tanks and DI-Water rinse with lift out and vacuum dryer. The installation combines the latest technologies in ultrasonic cleaning for precision optical components. The system employs multi frequency immersed ultrasonic transducers and special rinsing technologies The complete installation will be explained in detail; the concept in its whole, the lay out, the particular setup of each cleaning system etc. will be shown and explained together with construction particulars of the complete installation.

  6. V-TECS Guide for Carpenter.

    ERIC Educational Resources Information Center

    Moore, Charles G.; And Others

    This curriculum guide provides materials for a nine-duty course in carpentry. The nine duties are estimating materials, preparing building site, sharpening tools, building and installing foundation forms, installing rough framing, installing roof components, installing exterior finishes, installing interior finishes, and assembling and…

  7. Analysis of the Environmental Impact on Remanufacturing Wind Turbines

    NASA Astrophysics Data System (ADS)

    Sosa Skrainka, Manuel R.

    To deliver clean energy the use of wind turbines is essential. In June 2011 there was an installed wind capacity equivalent to 211,000MW world-wide (WWEA, 2011). By the end of the year 2009 the U.S. had 35,100MW of wind energy installed capacity to generate electricity (AWEA, 2010). This industry has grown in recent years and is expected to grow even more in the future. The environmental impacts that will arise from the increased number of wind turbines and their end-of-life should be addressed, as large amounts of resources will be required to satisfy the current and future market demands for wind turbines. Since future 10MW wind turbines are expected to be as heavy as 1000 tons each, the study of the environmental response of profitable retirement strategies, such as remanufacturing for these machines, must be considered. Because of the increased number of wind turbines and the materials used, this study provides a comparison between the environmental impacts from remanufacturing the components installed inside the nacelle of multi-megawatt wind turbines and wind turbines manufactured using new components. The study methodology is the following: • Describe the life-cycle and the materials and processes employed for the manufacture and remanufacturing for components inside the nacelle. • Identify remanufacturing alternatives for the components inside the nacelle at the end of the expected life-time service of wind turbines. • Evaluate the environmental impacts from the remanufactured components and compare the results with the impacts of the manufacturing of new components using SimaPro. • Conduct sensitivity analysis over the critical parameters of the life cycle assessment • Propose the most environmentally friendly options for the retirement of each major component of wind turbines. After an analysis of the scenarios the goal of the study is to evaluate remanufacturing as an end-of-life option from an environmental perspective for commercial multi-megawatt wind turbines targeted for secondary wind turbine markets.

  8. High performance VLSI telemetry data systems

    NASA Technical Reports Server (NTRS)

    Chesney, J.; Speciale, N.; Horner, W.; Sabia, S.

    1990-01-01

    NASA's deployment of major space complexes such as Space Station Freedom (SSF) and the Earth Observing System (EOS) will demand increased functionality and performance from ground based telemetry acquisition systems well above current system capabilities. Adaptation of space telemetry data transport and processing standards such as those specified by the Consultative Committee for Space Data Systems (CCSDS) standards and those required for commercial ground distribution of telemetry data, will drive these functional and performance requirements. In addition, budget limitations will force the requirement for higher modularity, flexibility, and interchangeability at lower cost in new ground telemetry data system elements. At NASA's Goddard Space Flight Center (GSFC), the design and development of generic ground telemetry data system elements, over the last five years, has resulted in significant solutions to these problems. This solution, referred to as the functional components approach includes both hardware and software components ready for end user application. The hardware functional components consist of modern data flow architectures utilizing Application Specific Integrated Circuits (ASIC's) developed specifically to support NASA's telemetry data systems needs and designed to meet a range of data rate requirements up to 300 Mbps. Real-time operating system software components support both embedded local software intelligence, and overall system control, status, processing, and interface requirements. These components, hardware and software, form the superstructure upon which project specific elements are added to complete a telemetry ground data system installation. This paper describes the functional components approach, some specific component examples, and a project example of the evolution from VLSI component, to basic board level functional component, to integrated telemetry data system.

  9. 43 CFR 3162.7-5 - Site security on Federal and Indian (except Osage) oil and gas leases.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... connections they were used as well as when they were installed and removed. The site facility diagram(s) shall...-resettable totalizers. There shall be no by-pass piping around the LACT. All components of the LACT that are... possess the identification documentation required by appicable NTL's or onshore Orders while the oil is...

  10. 43 CFR 3162.7-5 - Site security on Federal and Indian (except Osage) oil and gas leases.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... connections they were used as well as when they were installed and removed. The site facility diagram(s) shall...-resettable totalizers. There shall be no by-pass piping around the LACT. All components of the LACT that are... possess the identification documentation required by appicable NTL's or onshore Orders while the oil is...

  11. 43 CFR 3162.7-5 - Site security on Federal and Indian (except Osage) oil and gas leases.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... connections they were used as well as when they were installed and removed. The site facility diagram(s) shall...-resettable totalizers. There shall be no by-pass piping around the LACT. All components of the LACT that are... possess the identification documentation required by appicable NTL's or onshore Orders while the oil is...

  12. Perceptual/Psychomotor Requirements Basic to performance in 35 Air Force Specialties.

    DTIC Science & Technology

    1980-12-01

    Supra-segmental Reflexes c 26. Locomotor Movements¢ 27. Non- Locomotor Movementac 28. Manipulative Movements c 29. Kinesthetic Discrimination 30...auxiliary equipment components for installation (6.10, Ground Radio Equipment Repair) Control Operate standard gasoline or electric powered forklifts...Precision (6.23, Munitions Maintenance) Operate munitions transport trucks or truck-tractors (6.19, Munitions Maintenance) Rate operate standard gasoline or

  13. Department of Defense Strategic Sustainability Performance Plan, FY 2011

    DTIC Science & Technology

    2011-01-01

    particularly in Asia— places pressure on projected oil production and refining capacity . Relating specifically to the fixed installations under the...ensure that sustainability factors are adequately addressed. Departmental planning and programming guidance lays out requirements that DoD Components... factors in addition to mission, financial, and regulatory considerations. For example, the mission benefits of having an off-grid source of electricity

  14. Solar power satellite—Life-cycle energy recovery considerations

    NASA Astrophysics Data System (ADS)

    Weingartner, S.; Blumenberg, J.

    1995-05-01

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for a cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead of monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power plant components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on Earth (rectenna) requires in the order of 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production, installation and operation, is in the order of two years.

  15. Support for life-cycle product reuse in NASA's SSE

    NASA Technical Reports Server (NTRS)

    Shotton, Charles

    1989-01-01

    The Software Support Environment (SSE) is a software factory for the production of Space Station Freedom Program operational software. The SSE is to be centrally developed and maintained and used to configure software production facilities in the field. The PRC product TTCQF provides for an automated qualification process and analysis of existing code that can be used for software reuse. The interrogation subsystem permits user queries of the reusable data and components which have been identified by an analyzer and qualified with associated metrics. The concept includes reuse of non-code life-cycle components such as requirements and designs. Possible types of reusable life-cycle components include templates, generics, and as-is items. Qualification of reusable elements requires analysis (separation of candidate components into primitives), qualification (evaluation of primitives for reusability according to reusability criteria) and loading (placing qualified elements into appropriate libraries). There can be different qualifications for different installations, methodologies, applications and components. Identifying reusable software and related components is labor-intensive and is best carried out as an integrated function of an SSE.

  16. 14 CFR 1203a.105 - Implementation by field and component installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NASA SECURITY AREAS § 1203a.105 Implementation by field and component installations. If a Director of a... provision of this part, the instructions must first be published in the Federal Register. Therefore, the...

  17. Direct launch using the electric rail gun

    NASA Technical Reports Server (NTRS)

    Barber, J. P.

    1983-01-01

    The concept explored involves using a large single stage electric rail gun to achieve orbital velocities. Exit aerodynamics, launch package design and size, interior ballistics, system and component sizing and design concepts are treated. Technology development status and development requirements are identified and described. The expense of placing payloads in Earth orbit using conventional chemical rockets is considerable. Chemical rockets are very inefficient in converting chemical energy into payload kinetic energy. A rocket motor is relatively expensive and is usually expended on each launch. In addition specialized and expensive forms of fuel are required. Gun launching payloads directly to orbit from the Earth's surface is a possible alternative. Guns are much more energy efficient than rockets. The high capital cost of the gun installation can be recovered by reusing it over and over again. Finally, relatively inexpensive fuel and large quantities of energy are readily available to a fixed installation on the Earth's surface.

  18. Solar heating and hot water system installed at Saint Louis, Missouri

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  19. Customized overhead cranes for installation of India's largest 3.6m optical telescope at Devasthal, Nainital, India

    NASA Astrophysics Data System (ADS)

    Bangia, Tarun; Yadava, Shobhit; Kumar, Brijesh; Ghanti, A. S.; Hardikar, P. M.

    2016-07-01

    India's largest 3.6 m aperture optical telescope facility has been recently established at Devasthal site by Aryabhatta Research Institute of Observation Sciences (ARIES), an autonomous Institute under Department of Science and Technology, Government of India. The telescope is equipped with active optics and it is designed to be used for seeinglimited observations at visible and near-infrared wavelengths. A steel building with rotating cylindrical steel Dome was erected to house 3.6m telescope and its accessories at hilltop of Devasthal site. Customized cranes were essentially required inside the building as there were space constraints around the telescope building for operating big external heavy duty cranes from outside, transportation constraints in route for bringing heavy weight cranes, altitude of observatory, and sharp bends etc. to site. To meet the challenge of telescope installation from inside the telescope building by lifting components through its hatch, two Single Girder cranes and two Under Slung cranes of 10 MT capacity each were specifically designed and developed. All the four overhead cranes were custom built to achieve the goal of handling telescope mirror and its various components during installation and assembly. Overhead cranes were installed in limited available space inside the building and tested as per IS 3177. Cranes were equipped with many features like VVVFD compatibility, provision for tandem operation, digital load display, anti-collision mechanism, electrical interlocks, radio remote, low hook height and compact carriage etc. for telescope integration at site.

  20. NSTX Electrical Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    A. Ilic; E. Baker; R. Hatcher

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in themore » Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems.« less

  1. Guide for inservice inspection of ground-based pressure vessels and systems

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This guide includes recommendations for inservice inspection and recertification of ground based, unfired pressure vessels and all pressurized systems including those served by fired pressure vessels hereinafter referred to as pressure vessels, systems and components of systems. It covers the vast array of pound based industrial and special purpose pressurized components and systems used at NASA field installations for research and development and those utility systems and components that require more than routine maintenance to insure continued structural integrity for their useful life. Through surveillance and correction of inservice deterioration, NASA will maintain a safe working environment for their own and contractor personnel, safety for the public sector and protection against loss of capital investment.

  2. Equipment and water treatment considerations for the provision of quotidian home hemodialysis.

    PubMed

    Mehrabian, Shawn; Morgan, Dale; Schlaeper, Christian; Kortas, Claude; Lindsay, Robert M

    2003-07-01

    Whereas clinical benefits of more frequent hemodialysis (HD) treatment are well documented, little information is available about technical aspects involved in setting up a patient's home for home HD. Technical considerations include the home infrastructure, as well as required plumbing modifications and electrical hook-ups. Twenty home HD installations were supported for the London Daily/Nocturnal Hemodialysis Study. The Fresenius 2008H (Fresenius Medical Care, North America, Lexington, MA) HD machine was used for all home HD installations in conjunction with a Service Deionization Tank (SDI) water treatment system composed of pretreatment, purification, and posttreatment components. To ensure that SDI systems provided high-quality water and dialysate, standard bacteriological testing was performed throughout the study, and patient serum C-reactive protein (CRP) levels were tracked as an indicator of nonspecific inflammation. The annual number of hours of work required for each home HD installation and service/maintenance was approximately 75 and 58 hours, respectively. Water quality proved high because there were only 4 occurrences of failed endotoxin and bacterial tests; all were subsequently retested and provided satisfactory results. Serum CRP levels showed no significant difference comparing home HD patients with conventional in-center HD control patients. Although support of 20 home HD installations was economically feasible within the constraints of the London Health Sciences Centre Department of Biomedical Engineering, resources were strained by the final year of the study. This suggests that any sustained growth beyond the current study design may require a review of staffing, resources, and model of service delivery needs.

  3. 24 CFR 3286.107 - Installation in accordance with standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... requirements. (1) For purposes of determining installer compliance, a manufactured home that is subject to the requirements of this subpart B must be installed in accordance with: (i) An installation design and...

  4. Flight service environmental effects on composite materials and structures

    NASA Technical Reports Server (NTRS)

    Dexter, H. Benson; Baker, Donald J.

    1992-01-01

    NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.

  5. A summary of the mechanical design, testing and performance of the IMP-H and J attitude control systems

    NASA Technical Reports Server (NTRS)

    Metzger, J. R.

    1974-01-01

    The main aspects of the attitude control system used on both the IMP-H and J spacecraft are presented. The mechanical configuration is described. Information on all the specific components comprising the flight system is provided. The acceptance and qualification testing of both individual components and the installed system are summarized. Functional information regarding the operation and performance in relation to the orbiting spacecraft and its mission is included. Related topics which are discussed are: (1) safety requirements, (2) servicing procedures, (3) anomalous behavior, and (4) pyrotechnic devices.

  6. Baking and helium glow discharge cleaning of SST-1 Tokamak with graphite plasma facing components

    NASA Astrophysics Data System (ADS)

    Semwal, P.; Khan, Z.; Raval, D. C.; Dhanani, K. R.; George, S.; Paravastu, Y.; Prakash, A.; Thankey, P.; Ramesh, G.; Khan, M. S.; Saikia, P.; Pradhan, S.

    2017-04-01

    Graphite plasma facing components (PFCs) were installed inside the SST-1 vacuum vessel. Prior to installation, all the graphite tiles were baked at 1000 °C in a vacuum furnace operated below 1.0 × 10-5 mbar. However due to the porous structure of graphite, they absorb a significant amount of water vapour from air during the installation process. Rapid desorption of this water vapour requires high temperature bake-out of the PFCs at ≥ 250 °C. In SST-1 the PFCs were baked at 250 °C using hot nitrogen gas facility to remove the absorbed water vapour. Also device with large graphite surface area has the disadvantage that a large quantity of hydrogen gets trapped inside it during plasma discharges which makes density control difficult. Helium glow discharge cleaning (He-GDC) effectively removes this stored hydrogen as well as other impurities like oxygen and hydrocarbon within few nano-meters from the surface by particle induced desorption. Before plasma operation in SST-1 tokamak, both baking of PFCs and He-GDC were carried out so that these impurities were removed effectively. The mean desorption yield of hydrogen was found to be 0.24. In this paper the results of baking and He-GDC experiments of SST-1 will be presented in detail.

  7. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less

  8. Corrosion control acceptance criteria for sacrificial anode type, cathodic protection systems (user guide)

    NASA Astrophysics Data System (ADS)

    Hock, Vincent F.; Noble, Michael; McLeod, Malcolm E.

    1994-07-01

    The Army currently operates and maintains more than 20,000 underground storage tanks and over 3000 miles of underground gas pipelines, all of which require some form of corrosion control. Cathodic protection is one method of corrosion control used to prevent corrosion-induced leaks when a steel structure is exposed to an aggressive soil. The corrosion control acceptance criteria for sacrificial anode type CP systems provides guidelines for the DEH/DPW cathodic protection installation inspectors whose responsibilities are to ensure that the materials and equipment specified are delivered to the job site and subsequently installed in accordance with the engineering drawings and specifications. The sacrificial anode CP acceptance criteria includes all components for the sacrificial anode system such as insulated conductors, anodes, anode backfills, and auxiliary equipment. The sacrificial anode CP acceptance criteria is composed of a checklist that lists each component and that contains a space for the inspector to either check 'yes' or 'no' to indicate whether the component complies with the job specifications. In some cases, the inspector must measure and record physical dimensions or electrical output and compare the measurements to standards shown in attached tables.

  9. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  10. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  11. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  12. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  13. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  14. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  15. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  16. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  17. Integration of Environmental Planning Into the Army Master Planning Process

    DTIC Science & Technology

    1992-10-01

    Creating and implementing 13 required component plans (and additional optional ones) can be unwieldy and time consuming. There is also a fair amount of...agencies. This review is to occur following internal installation review, but prior to review and approval by the Major Command (MACOM) or Headquarters...master planning regulations and guidelines is a lack of internal consistency. Through these revisions, the guidelines should be made entirely

  18. Upper wide-angle viewing system for ITER.

    PubMed

    Lasnier, C J; McLean, A G; Gattuso, A; O'Neill, R; Smiley, M; Vasquez, J; Feder, R; Smith, M; Stratton, B; Johnson, D; Verlaan, A L; Heijmans, J A C

    2016-11-01

    The Upper Wide Angle Viewing System (UWAVS) will be installed on five upper ports of ITER. This paper shows major requirements, gives an overview of the preliminary design with reasons for some design choices, examines self-emitted IR light from UWAVS optics and its effect on accuracy, and shows calculations of signal-to-noise ratios for the two-color temperature output as a function of integration time and divertor temperature. Accurate temperature output requires correction for vacuum window absorption vs. wavelength and for self-emitted IR, which requires good measurement of the temperature of the optical components. The anticipated signal-to-noise ratio using presently available IR cameras is adequate for the required 500 Hz frame rate.

  19. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  20. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  1. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  2. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  3. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  4. Blind-Anchor-Nut-Installation Fixture (BANIF)

    NASA Technical Reports Server (NTRS)

    Willey, Norman F., Jr.; Linker, James F.

    1994-01-01

    Blind-anchor-nut-installation fixture, BANIF, developed for replacing or installing anchor nuts in blind holes or other inaccessible places. Attachment of anchor nut to BANIF enables placement of anchor nut on blind side of component.

  5. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...) The installer must display an original or a copy of a valid installation license at the site of the... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...

  6. The POIS (Parkland On-Line Information System) Implementation of the IBM Health Care Support/Patient Care System

    PubMed Central

    Mishelevich, David J.; Hudson, Betty G.; Van Slyke, Donald; Mize, Elaine I.; Robinson, Anna L.; Brieden, Helen C.; Atkinson, Jack; Robertson, James

    1980-01-01

    The installation of major components of a comprehensive Hospital Information System (HIS) called POIS, the Parkland On-line Information System, including identified success factors is described for the Dallas County Hospital District (DCHD) known also as the Parkland Memorial Hospital. Installation of the on-line IBM Health Care Support (HCS) Registration and Admissions Packages occurred in 1976 and implementation of the HCS Patient Care System (PCS) began in 1977 which includes on-line support of health care areas such as nursing stations and ancillary areas. The Duke Hospital Information System (DHIS) is marketed as the IBM HCS/Patient Care System (PCS). DCHD was the validation site. POIS has order entry, result reporting and work management components. While most of the patient care components are currently installed for the inpatient service, the Laboratories are being installed for the outpatient and Emergency areas as well. The Clinic Appointment System developed at the University of Michigan is also installed. The HCS family of programs use DL/1 and CICS and were installed in the OS versions, currently running under MVS on an IBM 370/168 Model 3 with 8 megabytes of main memory. ImagesFigure 1-AFigure 1-B

  7. 78 FR 13673 - HTC America, Inc.; Analysis of Proposed Consent Order To Aid Public Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... modifying various pre-installed applications and components in order to differentiate its products from.... As the customized applications and components are pre-installed on the device, consumers do not... together, failed to provide reasonable and appropriate security in the design and customization of software...

  8. 14 CFR 1212.703 - Headquarters and Field or Component Installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Headquarters and Field or Component Installations. 1212.703 Section 1212.703 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.703 Headquarters and Field or...

  9. 14 CFR 1212.703 - Headquarters and Field or Component Installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Headquarters and Field or Component Installations. 1212.703 Section 1212.703 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.703 Headquarters and Field or...

  10. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    NASA Astrophysics Data System (ADS)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe grade API 5L X60 which size from 8 to 20mm thickness with a water depth of 50 to 300m. Result shown that pipeline installation will fail from the wall thickness of 18mm onwards since it has been passed the critical yield percentage.

  11. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  12. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  13. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  14. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  15. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  16. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  17. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...

  18. Engine design considerations for 2nd generation supersonic transports

    NASA Technical Reports Server (NTRS)

    Howlett, R. A.

    1975-01-01

    The environmental and economic goals projected for advanced supersonic transports will require revolutionary improvements in propulsion systems. Variable cycle engine concepts that incorporate unique components and advanced technologies show promise in meeting these goals. Pratt & Whitney Aircraft is conducting conceptual design studies of variable cycle engine concepts under NASA sponsorship. This paper reviews some of the design considerations for these engine concepts. Emphasis is placed on jet noise abatement, reduction of emissions, performance improvements, installation considerations, hot-section characteristics and control system requirements. Two representative variable cycle engine concepts that incorporate these basic design considerations are described.

  19. 77 FR 808 - Certain Components for Installation of Marine Autopilots With GPS or IMU; Termination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... United States after importation of certain components for installation of marine autopilots with GPS or IMU (i.e., devices for pointing and stabilizing marine navigation equipment) by reason of infringement... of Marine Autopilots With GPS or IMU; Termination of Investigation on the Basis of Settlement AGENCY...

  20. Utilization requirements. A southern California Gas Company project SAGE report: Utilization requirements

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Schoen, R.; Hirshberg, A. S.

    1978-01-01

    Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.

  1. Measuring the Hydraulic Effectiveness of Low Impact Development Practices in a Heavily Urbanised Environment: A Case Study from London, UK

    NASA Astrophysics Data System (ADS)

    El Hattab, M. H.; Vernon, D.; Mijic, A.

    2017-12-01

    Low impact development practices (LID) are deemed to have a synergetic effect in mitigating urban storm water flooding. Designing and implementing effective LID practices require reliable real-life data about their performance in different applications; however, there are limited studies providing such data. In this study an innovative micro-monitoring system to assess the performance of porous pavement and rain gardens as retrofitting technologies was developed. Three pilot streets in London, UK were selected as part of Thames Water Utilities Limited's Counters Creek scheme. The system includes a V-notch weir installed at the outlet of each LID device to provide an accurate and reliable quantification over a wide range of discharges. In addition to, a low flow sensor installed downstream of the V-notch to cross-check the readings. Having a flow survey time-series of the pre-retrofitting conditions from the study streets, extensive laboratory calibrations under different flow conditions depicting the exact site conditions were performed prior to installing the devices in the field. The micro-monitoring system is well suited for high-resolution temporal monitoring and enables accurate long-term evaluation of LID components' performance. Initial results from the field validated the robustness of the system in fulfilling its requirements.

  2. 75 FR 66375 - Notice of a Regional Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... installed because they do not require a separate harmonics filter and thus can be installed in smaller... harmonics filter and thus can be installed in smaller spaces. At the Redwood Booster Station, which the... installed inside of the building rather than installing a separate harmonics [[Page 66376

  3. Aeroacoustics of Propulsion Airframe Integration: Overview of NASA's Research

    NASA Technical Reports Server (NTRS)

    Thomas, Russell H.

    2003-01-01

    The integration of propulsion and airframe is fundamental to the design of an aircraft system. Many considerations influence the integration, such as structural, aerodynamic, and maintenance factors. In regard to the acoustics of an aircraft, the integration can have significant effects on the net radiated noise. Whether an engine is mounted above a wing or below can have a significant effect on noise that reaches communities below because of shielding or reflection of engine noise. This is an obvious example of the acoustic effects of propulsion airframe installation. Another example could be the effect of the pylon on the development of the exhaust plume and on the resulting jet noise. In addition, for effective system noise reduction the impact that installation has on noise reduction devices developed on isolated components must be understood. In the future, a focus on the aerodynamic and acoustic interaction effects of installation, propulsion airframe aeroacoustics, will become more important as noise reduction targets become more difficult to achieve. In addition to continued fundamental component reduction efforts, a system level approach that includes propulsion airframe aeroacoustics will be required in order to achieve the 20 dB of perceived noise reduction envisioned by the long-range NASA goals. This emphasis on the aeroacoustics of propulsion airframe integration is a new part of NASA s noise research. The following paper will review current efforts and highlight technical challenges and approaches.

  4. Upper wide-angle viewing system for ITER

    DOE PAGES

    Lasnier, C. J.; McLean, A. G.; Gattuso, A.; ...

    2016-08-15

    The Upper Wide Angle Viewing System (UWAVS) will be installed on five upper ports of ITER. Here, this paper shows major requirements, gives an overview of the preliminary design with reasons for some design choices, examines self-emitted IR light from UWAVS optics and its effect on accuracy, and shows calculations of signal-to-noise ratios for the two-color temperature output as a function of integration time and divertor temperature. Accurate temperature output requires correction for vacuum window absorption vs. wavelength and for self-emitted IR, which requires good measurement of the temperature of the optical components. The anticipated signal-to-noise ratio using presently availablemore » IR cameras is adequate for the required 500 Hz frame rate.« less

  5. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  6. Field test report of the Department of Energy's 100-kW vertical axis wind turbine

    NASA Astrophysics Data System (ADS)

    Nellums, R. O.

    1985-02-01

    Three second generation Darrieus type vertical axis wind turbines of approximately 120 kW capacity per unit were installed in 1980-1981. Through March 1984, over 9000 hours of operation had been accumulated, including 6600 hours of operation on the unit installed in Bushland, Texas. The turbines were heavily instrumented and have yielded a large amount of test data. Test results of this program, including aerodynamic, structural, drive train, and economic data are presented. Among the most favorable results were an aerodynamic peak performance coefficient of 0.41; fundamental structural integrity requiring few repairs and no major component replacements as of March 1984; and an average prototype fabrication cost of approximately $970 per peak kilowatt of output. A review of potential design improvements is presented.

  7. Ultrasonic humidification for telecommunications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Longo, F.

    1994-03-01

    This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less

  8. RHIC Prefire Protection Masks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drees, A.; Biscardi, C.; Curcio, T.

    2015-01-07

    The protection of the RHIC experimental detectors from damage due to beam hitting close upstream elements in cases of abort kicker prefires requires some dedicated precautionary measures with two general options: to bring the beam close to a limiting aperture (i.e. the beam pipe wall), as far upstream of the detector components as possible or, alternatively, to bring a limiting aperture close to the circulating beam. During the FY 2014 RHIC Heavy Ion run the first option was chosen because of the limited time available for preparation before the start of the run. For future runs the second option, inmore » this case the installation of dual-sided movable masks, is preferred. The installation of the masks, one per ring, is planned before the start of the FY 2015 run.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components onmore » a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.« less

  10. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  11. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  12. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  13. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  14. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  15. Development of Integrated Programs for Aerospace-vehicle design (IPAD): Integrated information processing requirements

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1979-01-01

    The engineering-specified requirements for integrated information processing by means of the Integrated Programs for Aerospace-Vehicle Design (IPAD) system are presented. A data model is described and is based on the design process of a typical aerospace vehicle. General data management requirements are specified for data storage, retrieval, generation, communication, and maintenance. Information management requirements are specified for a two-component data model. In the general portion, data sets are managed as entities, and in the specific portion, data elements and the relationships between elements are managed by the system, allowing user access to individual elements for the purpose of query. Computer program management requirements are specified for support of a computer program library, control of computer programs, and installation of computer programs into IPAD.

  16. 14 CFR 29.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...

  17. 14 CFR 29.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...

  18. Quiet Clean Short-haul Experimental Engine (QCSEE) Under-The-Wing (UTW) composite nacelle

    NASA Technical Reports Server (NTRS)

    Johnston, E. A.

    1978-01-01

    The detail design of the under the wing experimental composite nacelle components is summarized. Analysis of an inlet, fan bypass duct doors, core cowl doors, and variable fan nozzle are given. The required technology to meet propulsion system performance, weight, and operational characteristics is discussed. The materials, design, and fabrication technology for quiet propulsion systems which will yield installed thrust to weight ratios greater than 3.5 to 1 are described.

  19. Design, Fabrication, and Shakeout Testing of ATALANTE Dissolver Off-Gas Sorbent-Based Capture System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Jr, Joseph Franklin; Jubin, Robert Thomas; Jordan, Jacob A.

    A sorbent-based capture system designed for integration into the existing dissolver off-gas (DOG) treatment system at the ATelier Alpha et Laboratoires pour ANalyses, Transuraniens et Etudes de retraitement (ATALANTE) facility has been successfully designed and fabricated and has undergone shakeout testing. Discussions with personnel from the ATALANTE facility provided guidance that was used for the design. All components for this system were specified, procured, and received on site at Oak Ridge National Laboratory (ORNL). The system was then fabricated and tested at ORNL to verify operation. Shakeout testing resulted in a simplified system. This system should be easily installed intomore » the existing facility and should be straightforward to operate during future experimental testing. All parts were selected to be compatible with ATALANTE power supplies, space requirements, and the existing DOG treatment system. Additionally, the system was demonstrated to meet all of four design requirements. These include (1) a dissolver off-gas flow rate of ≤100 L/h (1.67 L/min), (2) an external temperature of ≤50°C for all system components placed in the hot cell, (3) a sorbent bed temperature of ~150°C, and (4) a gas temperature of ~150°C upon entry into the sorbent bed. The system will be ready for shipment and installation in the existing DOG treatment system at ATALANTE in FY 2016.« less

  20. 40 CFR 88.306-94 - Requirements for a converted vehicle to qualify as a clean-fuel fleet vehicle.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... exemption from the post-installation emission test requirements of paragraph (c) of this section. If granted...) Sufficient information to demonstrate that complying with the post-installation emission test requirement... are subject to the post-installation test requirement of paragraph (c)(2) of this section. (iii) If...

  1. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less

  2. Utilization of CAD/CAE for concurrent design of structural aircraft components

    NASA Technical Reports Server (NTRS)

    Kahn, William C.

    1993-01-01

    The feasibility of installing the Stratospheric Observatory for Infrared Astronomy telescope (named SOFIA) into an aircraft for NASA astronomy studies is investigated using CAD/CAE equipment to either design or supply data for every facet of design engineering. The aircraft selected for the platform was a Boeing 747, chosen on the basis of its ability to meet the flight profiles required for the given mission and payload. CAD models of the fuselage of two of the aircraft models studied (747-200 and 747 SP) were developed, and models for the component parts of the telescope and subsystems were developed by the various concurrent engineering groups of the SOFIA program, to determine the requirements for the cavity opening and for design configuration. It is noted that, by developing a plan to use CAD/CAE for concurrent engineering at the beginning of the study, it was possible to produce results in about two-thirds of the time required using traditional methods.

  3. The effect of cleanliness control during installation work on the amount of accumulated dust in ducts of new HVAC installations.

    PubMed

    Holopainen, R; Tuomainen, M; Asikainen, V; Pasanen, P; Säteri, J; Seppänen, O

    2002-09-01

    The aim of this study was to evaluate the amount of dust in supply air ducts in recently installed ventilation systems. The samples for the determination of dust accumulation were collected from supply air ducts in 18 new buildings that have been constructed according to two different cleanliness control levels classified as category P1 (low oil residues and protected against contaminations) and category P2, as defined in the Classification of Indoor Climate, Construction and Building Materials. In the ducts installed according to the requirements of cleanliness category P1 the mean amount of accumulated dust was 0.9 g/m2 (0.4-2.9 g/m2), and in the ducts installed according to the cleanliness category P2 it was 2.3 g/m2 (1.2-4.9 g/m2). A significant difference was found in the mean amounts of dust between ducts of categories P1 and P2 (P < 0.008). The cleanliness control procedure in category P1 proved to be a useful and effective tool for preventing dust accumulation in new air ducts during the construction process. Additionally, the ducts without residual oil had lower amounts of accumulated dust indicating that the demand for oil free components in the cleanliness classification is reasonable.

  4. Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

    NASA Technical Reports Server (NTRS)

    Ross, Richard W.

    2001-01-01

    The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

  5. Floating Chip Mounting System Driven by Repulsive Force of Permanent Magnets for Multiple On-Site SPR Immunoassay Measurements

    PubMed Central

    Horiuchi, Tsutomu; Tobita, Tatsuya; Miura, Toru; Iwasaki, Yuzuru; Seyama, Michiko; Inoue, Suzuyo; Takahashi, Jun-ichi; Haga, Tsuneyuki; Tamechika, Emi

    2012-01-01

    We have developed a measurement chip installation/removal mechanism for a surface plasmon resonance (SPR) immunoassay analysis instrument designed for frequent testing, which requires a rapid and easy technique for changing chips. The key components of the mechanism are refractive index matching gel coated on the rear of the SPR chip and a float that presses the chip down. The refractive index matching gel made it possible to optically couple the chip and the prism of the SPR instrument easily via elastic deformation with no air bubbles. The float has an autonomous attitude control function that keeps the chip parallel in relation to the SPR instrument by employing the repulsive force of permanent magnets between the float and a float guide located in the SPR instrument. This function is realized by balancing the upward elastic force of the gel and the downward force of the float, which experiences a leveling force from the float guide. This system makes it possible to start an SPR measurement immediately after chip installation and to remove the chip immediately after the measurement with a simple and easy method that does not require any fine adjustment. Our sensor chip, which we installed using this mounting system, successfully performed an immunoassay measurement on a model antigen (spiked human-IgG) in a model real sample (non-homogenized milk) that included many kinds of interfering foreign substances without any sample pre-treatment. The ease of the chip installation/removal operation and simple measurement procedure are suitable for frequent on-site agricultural, environmental and medical testing. PMID:23202030

  6. 30 CFR 585.702 - What must I include in my Fabrication and Installation Report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...

  7. 30 CFR 585.702 - What must I include in my Fabrication and Installation Report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...

  8. 30 CFR 585.702 - What must I include in my Fabrication and Installation Report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...

  9. 2011 Cost of Wind Energy Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, S.; Lantz, E.; Hand, M.

    2013-03-01

    This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

  10. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  11. Online damage inspection of optics for ATP system

    NASA Astrophysics Data System (ADS)

    Chen, Jing; Jiang, Yu; Mao, Yao; Gan, Xun; Liu, Qiong

    2016-09-01

    In the Electro-Optical acquisition-tracking-pointing system (ATP), the optical components will be damaged with the several influencing factors. In this situation, the rate will increase sharply when the arrival of damage to some extent. As the complex processing techniques and long processing cycle of optical components, the damage will cause the great increase of the system development cost and cycle. Therefore, it is significant to detect the laser-induced damage in the ATP system. At present, the major research on the on-line damage detection technology of optical components is for the large optical system in the international. The relevant detection systems have complicated structures and many of components, and require enough installation space reserved, which do not apply for ATP system. To solve the problem mentioned before, This paper use a method based on machine vision to detect the damage on-line for the present ATP system. To start with, CCD and PC are used for image acquisition. Secondly, smoothing filters are used to restrain false damage points produced by noise. Then, with the shape feature included in the damage image, the OTSU Method which can define the best segmentation threshold automatically is used to achieve the goal to locate the damage regions. At last, we can supply some opinions for the lifetime of the optical components by analyzing the damage data, such as damage area, damage position. The method has the characteristics of few-detectors and simple-structures which can be installed without any changes of the original light path. With the method, experimental results show that it is stable and effective to achieve the goal of detecting the damage of optical components on-line in the ATP system.

  12. 40 CFR 63.7830 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...

  13. 40 CFR 88.306-94 - Requirements for a converted vehicle to qualify as a clean-fuel fleet vehicle.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Administrator for an exemption from the post-installation emission test requirements of paragraph... aftermarket conversion certifier's vehicles are subject to the post-installation test requirement of paragraph... Administrator of such revision. A post-installation emissions test for each conversion performed after the...

  14. 40 CFR 88.306-94 - Requirements for a converted vehicle to qualify as a clean-fuel fleet vehicle.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Administrator for an exemption from the post-installation emission test requirements of paragraph... aftermarket conversion certifier's vehicles are subject to the post-installation test requirement of paragraph... Administrator of such revision. A post-installation emissions test for each conversion performed after the...

  15. 40 CFR 88.306-94 - Requirements for a converted vehicle to qualify as a clean-fuel fleet vehicle.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Administrator for an exemption from the post-installation emission test requirements of paragraph... aftermarket conversion certifier's vehicles are subject to the post-installation test requirement of paragraph... Administrator of such revision. A post-installation emissions test for each conversion performed after the...

  16. 40 CFR 88.306-94 - Requirements for a converted vehicle to qualify as a clean-fuel fleet vehicle.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Administrator for an exemption from the post-installation emission test requirements of paragraph... aftermarket conversion certifier's vehicles are subject to the post-installation test requirement of paragraph... Administrator of such revision. A post-installation emissions test for each conversion performed after the...

  17. 46 CFR 76.01-5 - Equipment installed but not required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Equipment installed but not required. 76.01-5 Section 76.01-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Application § 76.01-5 Equipment installed but not required. (a) Where fire detecting or...

  18. 47 CFR 80.877 - Controls and indicators required for VHF radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Controls and indicators required for VHF... Cargo Vessels Not Subject to Subpart W § 80.877 Controls and indicators required for VHF radiotelephone installation. The controls and indicators used on equipment of the VHF radiotelephone installation must meet...

  19. 47 CFR 80.877 - Controls and indicators required for VHF radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Controls and indicators required for VHF... Cargo Vessels Not Subject to Subpart W § 80.877 Controls and indicators required for VHF radiotelephone installation. The controls and indicators used on equipment of the VHF radiotelephone installation must meet...

  20. Requiring suspended drunk drivers to install alcohol interlocks to reinstate their licenses: effective?

    PubMed Central

    Voas, Robert B.; Tippetts, S. Scott; Fisher, Deborah; Grosz, Milton

    2015-01-01

    Aims To evaluate a new method being used by some states for motivating interlock installation by requiring it as a prerequisite to reinstatement of the driver’s license. Design The driving records of Florida DWI offenders convicted between July 2002 and June 2008 were analyzed to determine the proportion of offenders subject to the interlock requirement who installed interlocks. Setting Most driving-while-impaired (DWI) offenders succeed in avoiding state laws requiring the installation of a vehicle alcohol interlock. Participants A total of 82 318 Florida DWI offenders. Findings Due to long periods of complete suspension when no driving was permitted and the failure to complete all the requirements imposed by the court, only 21 377 of the 82 318 offenders studied qualified for reinstatement, but 93% of those who qualified did install interlocks to be reinstated. Conclusions Because of the lengthy license suspensions and other barriers that the offenders face in qualifying for reinstatement, it is not clear that requiring a period on the interlock as a prerequisite to reinstating will greatly increase the current installment rate. PMID:20528811

  1. Quantitative understanding of explosive stimulus transfer

    NASA Technical Reports Server (NTRS)

    Schimmel, M. L.

    1973-01-01

    The mechanisms of detonation transfer across hermetically sealed interfaces created by necessary interruptions in high explosive trains, such as at detonators to explosive columns, field joints in explosive columns, and components of munitions fuse trains are demostrated. Reliability of detonation transfer is limited by minimizing explosive quantities, the use of intensitive explosives for safety, and requirements to propagate across gaps and angles dictated by installation and production restraints. The major detonation transfer variables studied were: explosive quanity, sensitivity, and thickness, and the separation distances between donor and acceptor explosives.

  2. Installation Restoration Program (IRP) Stage 3, Operable Unit B engineering Evaluation/Cost Analysis - Environmental Assessment for McClellan AFB/EM, McClellan AFB, California

    DTIC Science & Technology

    1990-12-01

    Force ......,,...Human Systems Division (AFSC) .................. . . .. . . RP Pr ra -Offic (HSDIYAO) .............. ........... Brooks Air Force...intra- system piping. Six months to one year would be required to complete and integrate these components. EECA/021491/jlh 6-39 RADIAN COlVOR AT 1O IN... system capacity has been exceeded. It is a possibility that during severe storm events, the groundwater extraction wells will be shut down to avoid

  3. Warfighter Physiological and Environmental Monitoring: A Study for the U.S. Army Research Institute in Environmental Medicine and the Soldier Systems Center

    DTIC Science & Technology

    2004-11-01

    peripheral devices , such as a heart- rate monitor, oximeter, etc., over a wireless link. Interfacing to peripheral sensors requires installation of... devices are powered from wall outlets. However, for networks comprising mobile devices , and in particular for a PAN comprising body-worn sensors ...SpO2) cost in excess of $25K per system 2. Size, weight, and power – Excluding the sensors , the mobile components (comm link and data archiving

  4. Operating temperatures of open-rack installed photovoltaic inverters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Z.; Wang, L.; Kurtz, S.

    This paper presents a model for evaluating the heat-sink and component temperatures of open-rack installed photovoltaic inverters. These temperatures can be used for predicting inverter reliability. Inverter heat-sink temperatures were measured for inverters connected to three grid-connected PV (photovoltaic) test systems in Golden, Colorado, US. A model is proposed for calculating the inverter heat-sink temperature based on the ambient temperature, the ratio of the consumed power to the rated power of the inverter, and the measured wind speed. To verify and study this model, more than one year of inverter DC/AC power, irradiance, wind speed, and heat sink temperature risemore » data were collected and analyzed. The model is shown to be accurate in predicting average inverter temperatures, but will require further refinement for prediction of transient temperatures.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenie, Koen; Mulier, Guido; Vandorpe, Marc

    Safe decontamination is a regular requirement in the lifecycle of a nuclear plant and is integral to the careful maintenance of any nuclear installation for 4 key reasons: - To decrease the risk of radioactive contamination spreading; - To limit the radioactive doses contracted by maintenance personnel; - To limit the radioactive doses incurred during decommissioning; - To downgrade the class of radioactive waste The primary goal of decommissioning is to remove aged and/or contaminated and/or activated components of an installation, safely and securely, in as short a time as possible. There are several reasons why this may be necessary:more » - To eliminate the risk of radioactive contamination spreading; - To eliminate the risk of radiation; - To downgrade a site or a circuit to a point where it no longer is submitted to regular inspection; - To remove installations or parts that are no longer in service or have aged There are many different D and D techniques, tools and materials available today. What is important is knowing how best to use them. This paper describes the experiences and the future projects of Tecnubel in D and D projects in Belgium and abroad. (authors)« less

  6. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...' Laboratories, Inc., or Factory Mutual Engineering Corp. (c) The components of each dry powder chemical system... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of dry powder chemical systems. 75...-14 Installation of dry powder chemical systems. (a) Self-contained dry powder chemical systems shall...

  7. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...' Laboratories, Inc., or Factory Mutual Engineering Corp. (c) The components of each dry powder chemical system... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of dry powder chemical systems. 75...-14 Installation of dry powder chemical systems. (a) Self-contained dry powder chemical systems shall...

  8. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...' Laboratories, Inc., or Factory Mutual Engineering Corp. (c) The components of each dry powder chemical system... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of dry powder chemical systems. 75...-14 Installation of dry powder chemical systems. (a) Self-contained dry powder chemical systems shall...

  9. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...' Laboratories, Inc., or Factory Mutual Engineering Corp. (c) The components of each dry powder chemical system... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of dry powder chemical systems. 75...-14 Installation of dry powder chemical systems. (a) Self-contained dry powder chemical systems shall...

  10. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...' Laboratories, Inc., or Factory Mutual Engineering Corp. (c) The components of each dry powder chemical system... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of dry powder chemical systems. 75...-14 Installation of dry powder chemical systems. (a) Self-contained dry powder chemical systems shall...

  11. 46 CFR 76.25-35 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  12. Building Capacity for Earthquake Monitoring: Linking Regional Networks with the Global Community

    NASA Astrophysics Data System (ADS)

    Willemann, R. J.; Lerner-Lam, A.

    2006-12-01

    Installing or upgrading a seismic monitoring network is often among the mitigation efforts after earthquake disasters, and this is happening in response to the events both in Sumatra during December 2004 and in Pakistan during October 2005. These networks can yield improved hazard assessment, more resilient buildings where they are most needed, and emergency relief directed more quickly to the worst hit areas after the next large earthquake. Several commercial organizations are well prepared for the fleeting opportunity to provide the instruments that comprise a seismic network, including sensors, data loggers, telemetry stations, and the computers and software required for the network center. But seismic monitoring requires more than hardware and software, no matter how advanced. A well-trained staff is required to select appropriate and mutually compatible components, install and maintain telemetered stations, manage and archive data, and perform the analyses that actually yield the intended benefits. Monitoring is more effective when network operators cooperate with a larger community through free and open exchange of data, sharing information about working practices, and international collaboration in research. As an academic consortium, a facility operator and a founding member of the International Federation of Digital Seismographic Networks, IRIS has access to a broad range of expertise with the skills that are required to help design, install, and operate a seismic network and earthquake analysis center, and stimulate the core training for the professional teams required to establish and maintain these facilities. But delivering expertise quickly when and where it is unexpectedly in demand requires advance planning and coordination in order to respond to the needs of organizations that are building a seismic network, either with tight time constraints imposed by the budget cycles of aid agencies following a disastrous earthquake, or as part of more informed national programs for hazard assessment and mitigation.

  13. Component-Level Selection and Qualification for the Global Ecosystem Dynamics Investigation (GEDI) Laser Altimeter Transmitter

    NASA Technical Reports Server (NTRS)

    Frese, Erich A.; Chiragh, Furqan L.; Switzer, Robert; Vasilyev, Aleksey A.; Thomes, Joe; Coyle, D. Barry; Stysley, Paul R.

    2018-01-01

    Flight quality solid-state lasers require a unique and extensive set of testing and qualification processes, both at the system and component levels to insure the laser's promised performance. As important as the overall laser transmitter design is, the quality and performance of individual subassemblies, optics, and electro-optics dictate the final laser unit's quality. The Global Ecosystem Dynamics Investigation (GEDI) laser transmitters employ all the usual components typical for a diode-pumped, solid-state laser, yet must each go through their own individual process of specification, modeling, performance demonstration, inspection, and destructive testing. These qualification processes and results for the laser crystals, laser diode arrays, electro-optics, and optics, will be reviewed as well as the relevant critical issues encountered, prior to their installation in the GEDI flight laser units.

  14. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  15. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  16. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  17. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... interconnections must be provided to prevent differences of potential between major components of the installation and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect the...

  18. Error-proofing test system of industrial components based on image processing

    NASA Astrophysics Data System (ADS)

    Huang, Ying; Huang, Tao

    2018-05-01

    Due to the improvement of modern industrial level and accuracy, conventional manual test fails to satisfy the test standards of enterprises, so digital image processing technique should be utilized to gather and analyze the information on the surface of industrial components, so as to achieve the purpose of test. To test the installation parts of automotive engine, this paper employs camera to capture the images of the components. After these images are preprocessed including denoising, the image processing algorithm relying on flood fill algorithm is used to test the installation of the components. The results prove that this system has very high test accuracy.

  19. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  20. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  1. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  2. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or sacrificial anodes); and (C) Electrical isolation devices such as insulating joints and flanges... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation...

  3. A Novel Technique Applying Spectral Estimation to Johnson Noise Thermometry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ezell, N. Dianne Bull; Britton, Chuck; Ericson, Nance

    Johnson noise thermometry is one of many important measurement techniques used to monitor the safety levels and stability in a nuclear reactor. However, this measurement is very dependent on the minimal electromagnetic environment. Properly removing unwanted electromagnetic interference (EMI) is critical for accurate drift-free temperature measurements. The two techniques developed by Oak Ridge National Laboratory (ORNL) to remove transient and periodic EMI are briefly discussed here. Spectral estimation is a key component in the signal processing algorithm used for EMI removal and temperature calculation. The cross-power spectral density is a key component in the Johnson noise temperature computation. Applying eithermore » technique requires the simple addition of electronics and signal processing to existing resistive thermometers. With minimal installation changes, the system discussed here can be installed on existing nuclear power plants. The Johnson noise system developed is tested at three locations: ORNL, Sandia National Laboratory, and the Tennessee Valley Authority’s Kingston Fossil Plant. Each of these locations enabled improvement on the EMI removal algorithm. Finally, the conclusions made from the results at each of these locations is discussed, as well as possible future work.« less

  4. A Novel Technique Applying Spectral Estimation to Johnson Noise Thermometry

    DOE PAGES

    Ezell, N. Dianne Bull; Britton, Chuck; Ericson, Nance; ...

    2018-03-30

    Johnson noise thermometry is one of many important measurement techniques used to monitor the safety levels and stability in a nuclear reactor. However, this measurement is very dependent on the minimal electromagnetic environment. Properly removing unwanted electromagnetic interference (EMI) is critical for accurate drift-free temperature measurements. The two techniques developed by Oak Ridge National Laboratory (ORNL) to remove transient and periodic EMI are briefly discussed here. Spectral estimation is a key component in the signal processing algorithm used for EMI removal and temperature calculation. The cross-power spectral density is a key component in the Johnson noise temperature computation. Applying eithermore » technique requires the simple addition of electronics and signal processing to existing resistive thermometers. With minimal installation changes, the system discussed here can be installed on existing nuclear power plants. The Johnson noise system developed is tested at three locations: ORNL, Sandia National Laboratory, and the Tennessee Valley Authority’s Kingston Fossil Plant. Each of these locations enabled improvement on the EMI removal algorithm. Finally, the conclusions made from the results at each of these locations is discussed, as well as possible future work.« less

  5. Picture archiving and communication systems (PACS).

    PubMed

    Gamsu, Gordon; Perez, Enrico

    2003-07-01

    Over the past 2 decades, groups of computer scientists, electronic design engineers, and physicians, in universities and industry, have worked to achieve an electronic environment for the practice of medicine and radiology. The radiology component of this revolution is often called PACS (picture archiving and communication systems). More recently it has become evident that the efficiencies and cost savings of PACS are realized when they are part of an enterprise-wide electronic medical record. The installation of PACS requires careful planning by all the various stakeholds over many months prior to installation. All of the users must be aware of the initial disruption that will occur as they become familiar with the systems. Modern fourth generation PACS is linked to radiology and hospital information systems. The PACS consist of electronic acquisition sites-a robust network intelligently managed by a server, multiple viewing sites, and an archive. The details of how these are linked and their workflow analysis determines the success of PACS. PACS evolves over time, components are frequently replaced, and so the users must expect continuous learning about new updates and improved functionality. The digital medical revolution is rapidly being adopted in many medical centers, improving patient care and the success of the institution.

  6. 42 CFR 84.133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.133 Harnesses; installation and construction; minimum requirements...

  7. 24 CFR 3286.413 - Recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements of this part; and (6) A copy of foundation designs used to install the home, if different from the... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD... the installation work and the address of the home installed; (2) A copy of the contract pursuant to...

  8. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in... installing a manufactured home at any site, the installer must assure that the site is suitable for...

  9. Education & Collection Facility GSHP Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joplin, Jeff

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to amore » recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient system.« less

  10. 76 FR 81790 - Airworthiness Directives; Hawker Beechcraft Corporation Airplanes Equipped With a Certain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... modification that included installation of winglets and different engines and propellers) were installed. The... addition of winglets. (d) Subject Joint Aircraft System Component (JASC)/Air Transport Association (ATA) of...

  11. Hardware Testing for the Optical PAyload for Lasercomm Science (OPALS)

    NASA Technical Reports Server (NTRS)

    Slagle, Amanda

    2011-01-01

    Hardware for several subsystems of the proposed Optical PAyload for Lasercomm Science (OPALS), including the gimbal and avionics, was tested. Microswitches installed on the gimbal were evaluated to verify that their point of actuation would remain within the acceptable range even if the switches themselves move slightly during launch. An inspection of the power board was conducted to ensure that all power and ground signals were isolated, that polarized components were correctly oriented, and that all components were intact and securely soldered. Initial testing on the power board revealed several minor problems, but once they were fixed the power board was shown to function correctly. All tests and inspections were documented for future use in verifying launch requirements.

  12. Solar Heating And Cooling Of Buildings (SHACOB): Requirements definition and impact analysis-2. Volume 2: Domestic hot water systems

    NASA Astrophysics Data System (ADS)

    Cretcher, C. K.

    1980-11-01

    The various types of solar domestic hot water systems are discussed including their advantages and disadvantages. The problems that occur in hydronic solar heating systems are reviewed with emphasis on domestic hot water applicatons. System problems in retrofitting of residential buildings are also discussed including structural and space constraints for various components and subsystems. System design parameters include various collector sizing methods, collector orientation, storage capacity and heat loss from pipes and tanks. The installation costs are broken down by components and subsystems. The approach used for utility economic impact analysis is reviewed. The simulation is described, and the results of the economic impact analysis are given. A summary assessment is included.

  13. An inexpensive economical solar heating system for homes

    NASA Technical Reports Server (NTRS)

    Allred, J. W.; Shinn, J. M., Jr.; Kirby, C. E.; Barringer, S. R.

    1976-01-01

    A low-cost solar home heating system to supplement existing warm-air heating systems is described. The report is written in three parts: (1) a brief background on solar heating, (2) experience with a demonstration system, and (3) information for the homeowner who wishes to construct such a system. Instructions are given for a solar heating installation in which the homeowner supplies all labor necessary to install off-the-shelf components estimated to cost $2,000. These components, which include solar collector, heat exchanger, water pump, storage tank, piping, and controls to make the system completely automatic, are available at local lumber yards, hardware stores, and plumbing supply stores, and are relatively simple to install. Manufacturers and prices of each component used and a rough cost analysis based on these prices are included. This report also gives performance data obtained from a demonstration system which was built and tested at the Langley Research Center.

  14. Final design and fabrication of an active control system for flutter suppression on a supercritical aeroelastic research wing

    NASA Technical Reports Server (NTRS)

    Hodges, G. E.; Mcgehee, C. R.

    1981-01-01

    The final design and hardware fabrication was completed for an active control system capable of the required flutter suppression, compatible with and ready for installation in the NASA aeroelastic research wing number 1 (ARW-1) on Firebee II drone flight test vehicle. The flutter suppression system uses vertical acceleration at win buttock line 1.930 (76), with fuselage vertical and roll accelerations subtracted out, to drive wing outboard aileron control surfaces through appropriate symmetric and antisymmetric shaping filters. The goal of providing an increase of 20 percent above the unaugmented vehicle flutter velocity but below the maximum operating condition at Mach 0.98 is exceeded by the final flutter suppression system. Results indicate that the flutter suppression system mechanical and electronic components are ready for installation on the DAST ARW-1 wing and BQM-34E/F drone fuselage.

  15. DOD can save millions by using energy efficient centralized aircraft support systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-05-07

    The ways the Department of Defense can save millions of dollars annually by using new energy efficient centralized aircraft support systems at certain Air Force and Navy bases are discussed. The Air Force and Navy have developed and installed several different systems and have realized some degree of success. However, each service has developed its systems independently. Consequently, there is no commonality between the services' systems which could permit economical procurements for standard servicewide systems. Standardization would also prevent duplication of design efforts by the services and minimize proliferation of aircraft support equipment. It also would allow the services tomore » further reduce costs by combining requirements to assure the most economical quantities for buying system components. GAO makes specific recommendations to the Secretaries of Defense and the Air Force to develop standard systems and to install them at all bases where feasible and practical.« less

  16. A metrology system for a high resolution cavity beam position monitor system

    NASA Astrophysics Data System (ADS)

    Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Pete; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Hinton, Shantell; Honda, Yosuke; Khainovski, Oleg; Kolomensky, Yury; Loscutoff, Peter; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; Thomson, Mark; Urakawa, Junji; Vogel, Vladimir; Ward, David; White, Glen

    2013-11-01

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will likely be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved-ideally using a beam-based stability measurement. We developed a high resolution RF cavity Beam Position Monitor (BPM) system. A triplet of these BPMs, installed in the extraction line of the KEK Accelerator Test Facility (ATF) and tested with its ultra-low emittance beam, achieved a position measurement resolution of 15 nm. A metrology system for the three BPMs was subsequently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame. We have demonstrated that the three BPMs behave as a rigid-body at the level of less than 5 nm.

  17. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  18. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  19. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  20. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  1. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  2. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  3. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  4. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OIL IN BULK Design, Equipment, and Installation § 157.12g Plan approval requirements. Adequate documentation must be prepared well in advance of the intended installation of a monitoring system and must be... ballast handling manuals. Special considerations will be given to installations in oil tankers, which have...

  5. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environmental conditions, including the indirect effects of lightning strikes. (2) Any equipment and system does... Equipment General § 23.1309 Equipment, systems, and installations. The requirements of this section, except... requirements of part 23, to any equipment or system as installed in the airplane. This section is a regulation...

  6. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environmental conditions, including the indirect effects of lightning strikes. (2) Any equipment and system does... Equipment General § 23.1309 Equipment, systems, and installations. The requirements of this section, except... requirements of part 23, to any equipment or system as installed in the airplane. This section is a regulation...

  7. Semantically Enhanced Online Configuration of Feedback Control Schemes.

    PubMed

    Milis, Georgios M; Panayiotou, Christos G; Polycarpou, Marios M

    2018-03-01

    Recent progress toward the realization of the "Internet of Things" has improved the ability of physical and soft/cyber entities to operate effectively within large-scale, heterogeneous systems. It is important that such capacity be accompanied by feedback control capabilities sufficient to ensure that the overall systems behave according to their specifications and meet their functional objectives. To achieve this, such systems require new architectures that facilitate the online deployment, composition, interoperability, and scalability of control system components. Most current control systems lack scalability and interoperability because their design is based on a fixed configuration of specific components, with knowledge of their individual characteristics only implicitly passed through the design. This paper addresses the need for flexibility when replacing components or installing new components, which might occur when an existing component is upgraded or when a new application requires a new component, without the need to readjust or redesign the overall system. A semantically enhanced feedback control architecture is introduced for a class of systems, aimed at accommodating new components into a closed-loop control framework by exploiting the semantic inference capabilities of an ontology-based knowledge model. This architecture supports continuous operation of the control system, a crucial property for large-scale systems for which interruptions have negative impact on key performance metrics that may include human comfort and welfare or economy costs. A case-study example from the smart buildings domain is used to illustrate the proposed architecture and semantic inference mechanisms.

  8. Validation of Helicopter Gear Condition Indicators Using Seeded Fault Tests

    NASA Technical Reports Server (NTRS)

    Dempsey, Paula; Brandon, E. Bruce

    2013-01-01

    A "seeded fault test" in support of a rotorcraft condition based maintenance program (CBM), is an experiment in which a component is tested with a known fault while health monitoring data is collected. These tests are performed at operating conditions comparable to operating conditions the component would be exposed to while installed on the aircraft. Performance of seeded fault tests is one method used to provide evidence that a Health Usage Monitoring System (HUMS) can replace current maintenance practices required for aircraft airworthiness. Actual in-service experience of the HUMS detecting a component fault is another validation method. This paper will discuss a hybrid validation approach that combines in service-data with seeded fault tests. For this approach, existing in-service HUMS flight data from a naturally occurring component fault will be used to define a component seeded fault test. An example, using spiral bevel gears as the targeted component, will be presented. Since the U.S. Army has begun to develop standards for using seeded fault tests for HUMS validation, the hybrid approach will be mapped to the steps defined within their Aeronautical Design Standard Handbook for CBM. This paper will step through their defined processes, and identify additional steps that may be required when using component test rig fault tests to demonstrate helicopter CI performance. The discussion within this paper will provide the reader with a better appreciation for the challenges faced when defining a seeded fault test for HUMS validation.

  9. A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

    NASA Technical Reports Server (NTRS)

    Kennedy, Barbara J.

    2004-01-01

    The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

  10. Microwave Analysis with Monte Carlo Methods for ECH Transmission Lines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaufman, Michael C.; Lau, Cornwall H.; Hanson, Gregory R.

    A new code framework, MORAMC, is presented which model transmission line (TL) systems consisting of overmoded circular waveguide and other components including miter bends and transmission line gaps. The transmission line is modeled as a set of mode converters in series where each component is composed of one or more converters. The parametrization of each mode converter can account for the fabrication tolerances of physically realizable components. These tolerances as well as the precision to which these TL systems can be installed and aligned gives a practical limit to which the uncertainty of the microwave performance of the system canmore » be calculated. Because of this, Monte Carlo methods are a natural fit and are employed to calculate the probability distribution that a given TL can deliver a required power and mode purity. Several examples are given to demonstrate the usefulness of MORAMC in optimizing TL systems.« less

  11. Microwave Analysis with Monte Carlo Methods for ECH Transmission Lines

    DOE PAGES

    Kaufman, Michael C.; Lau, Cornwall H.; Hanson, Gregory R.

    2018-03-08

    A new code framework, MORAMC, is presented which model transmission line (TL) systems consisting of overmoded circular waveguide and other components including miter bends and transmission line gaps. The transmission line is modeled as a set of mode converters in series where each component is composed of one or more converters. The parametrization of each mode converter can account for the fabrication tolerances of physically realizable components. These tolerances as well as the precision to which these TL systems can be installed and aligned gives a practical limit to which the uncertainty of the microwave performance of the system canmore » be calculated. Because of this, Monte Carlo methods are a natural fit and are employed to calculate the probability distribution that a given TL can deliver a required power and mode purity. Several examples are given to demonstrate the usefulness of MORAMC in optimizing TL systems.« less

  12. Microwave Analysis with Monte Carlo Methods for ECH Transmission Lines

    NASA Astrophysics Data System (ADS)

    Kaufman, M. C.; Lau, C.; Hanson, G. R.

    2018-03-01

    A new code framework, MORAMC, is presented which model transmission line (TL) systems consisting of overmoded circular waveguide and other components including miter bends and transmission line gaps. The transmission line is modeled as a set of mode converters in series where each component is composed of one or more converters. The parametrization of each mode converter can account for the fabrication tolerances of physically realizable components. These tolerances as well as the precision to which these TL systems can be installed and aligned gives a practical limit to which the uncertainty of the microwave performance of the system can be calculated. Because of this, Monte Carlo methods are a natural fit and are employed to calculate the probability distribution that a given TL can deliver a required power and mode purity. Several examples are given to demonstrate the usefulness of MORAMC in optimizing TL systems.

  13. Signal Detection Theory Applied to Helicopter Transmission Diagnostic Thresholds

    NASA Technical Reports Server (NTRS)

    Dempsey, Paula J.; Keller, Jonathan A.; Wade, Daniel R.

    2008-01-01

    Helicopter Health Usage Monitoring Systems (HUMS) have potential for providing data to support increasing the service life of a dynamic mechanical component in the transmission of a helicopter. Data collected can demonstrate the HUMS condition indicator responds to a specific component fault with appropriate alert limits and minimal false alarms. Defining thresholds for specific faults requires a tradeoff between the sensitivity of the condition indicator (CI) limit to indicate damage and the number of false alarms. A method using Receiver Operating Characteristic (ROC) curves to assess CI performance was demonstrated using CI data collected from accelerometers installed on several UH60 Black Hawk and AH64 Apache helicopters and an AH64 helicopter component test stand. Results of the analysis indicate ROC curves can be used to reliably assess the performance of commercial HUMS condition indicators to detect damaged gears and bearings in a helicopter transmission.

  14. Signal Detection Theory Applied to Helicopter Transmission Diagnostic Thresholds

    NASA Technical Reports Server (NTRS)

    Dempsey, Paula J.; Keller, Jonathan A.; Wade, Daniel R.

    2009-01-01

    Helicopter Health Usage Monitoring Systems (HUMS) have potential for providing data to support increasing the service life of a dynamic mechanical component in the transmission of a helicopter. Data collected can demonstrate the HUMS condition indicator responds to a specific component fault with appropriate alert limits and minimal false alarms. Defining thresholds for specific faults requires a tradeoff between the sensitivity of the condition indicator (CI) limit to indicate damage and the number of false alarms. A method using Receiver Operating Characteristic (ROC) curves to assess CI performance was demonstrated using CI data collected from accelerometers installed on several UH60 Black Hawk and AH64 Apache helicopters and an AH64 helicopter component test stand. Results of the analysis indicate ROC curves can be used to reliably assess the performance of commercial HUMS condition indicators to detect damaged gears and bearings in a helicopter transmission.

  15. Mobile radio alternative systems study. Volume 2: Terrestrial. [rural areas

    NASA Technical Reports Server (NTRS)

    Cromwell, N.; Lester, H. L.; Anderson, R. E.

    1983-01-01

    Terrestrial systems for satisfying the markets for mobile radio services in non-urban areas of the United States in the years from 185 to 2000 were investigated. Present day mobile communication technologies, systems and equipment are described for background in evaluating the concepts generated. Average propagation ranges are calculated for terrestrial installations in each of seven physiographic areas of the contiguous states to determine the number of installations that would be required for nationwide coverage. Four system concepts are defined and analyzed to determine how well terrestrial systems can fulfill the requirements at acceptable costs. Nationwide dispatch, telephone and data services would require terrestrial installations in many locations where they would be used infrequently and would not recover their investment. Access to a roaming vehicle requires that the vehicle location be known within the range limit of the terrestrial installation in which the vehicle is present at the time of the call. Access to that installation must be made through the public switched telephone network, usually involving a long-distance toll charge, and requiring costly means to track or locate the vehicle as it moved through the network of installations.

  16. Using GIS data and satellite derived irradiance to optimize siting of PV installations in Switzerland

    NASA Astrophysics Data System (ADS)

    Kahl, Annelen; Nguyen, Viet-Anh; Bartlett, Stuart; Sossan, Fabrizio; Lehning, Michael

    2016-04-01

    For a successful distribution strategy of PV installations, it does not suffice to choose the locations with highest annual total irradiance. Attention needs to be given to spatial correlation patterns of insolation to avoid large system-wide variations, which can cause extended deficits in supply or might even damage the electrical network. One alternative goal instead is to seek configurations that provide the smoothest energy production, with the most reliable and predictable supply. Our work investigates several scenarios, each pursuing a different strategy for a future renewable Switzerland without nuclear power. Based on an estimate for necessary installed capacity for solar power [Bartlett, 2015] we first use heuristics to pre-select realistic placements for PV installations. Then we apply optimization methods to find a subset of locations that provides the best possible combined electricity production. For the first part of the selection process, we use a DEM to exclude high elevation zones which would be difficult to access and which are prone to natural hazards. Then we use land surface cover information to find all zones with potential roof area, deemed suitable for installation of solar panels. The optimization employs Principal Component Analysis of satellite derived irradiance data (Surface Incoming Shortwave Radiation (SIS), based on Meteosat Second Generation sensors) to incorporate a spatial aspect into the selection process that does not simply maximize annual total production but rather provides the most robust supply, by combining regions with anti-correlated cloud cover patterns. Depending on the initial assumptions and constraints, the resulting distribution schemes for PV installations vary with respect to required surface area, annual total and lowest short-term production, and illustrate how important it is to clearly define priorities and policies for a future renewable Switzerland.

  17. A statistical method for determining the dimensions, tolerances and specification of optics for the Laser Megajoule facility (LMJ)

    NASA Astrophysics Data System (ADS)

    Denis, Vincent

    2008-09-01

    This paper presents a statistical method for determining the dimensions, tolerance and specifications of components for the Laser MegaJoule (LMJ). Numerous constraints inherent to a large facility require specific tolerances: the huge number of optical components; the interdependence of these components between the beams of same bundle; angular multiplexing for the amplifier section; distinct operating modes between the alignment and firing phases; the definition and use of alignment software in the place of classic optimization. This method provides greater flexibility to determine the positioning and manufacturing specifications of the optical components. Given the enormous power of the Laser MegaJoule (over 18 kJ in the infrared and 9 kJ in the ultraviolet), one of the major risks is damage the optical mounts and pollution of the installation by mechanical ablation. This method enables estimation of the beam occultation probabilities and quantification of the risks for the facility. All the simulations were run using the ZEMAX-EE optical design software.

  18. Real-time Optical Alignment and Diagnostic System (ROADS)

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The ultimate and most frequent usage of ROADS will be the alignment of subassemblies (collector and collimator) prior to their installation in a chamber. The system as designed has inherent associated capabilities well applied to acceptance testing of the No. 4 mirror, prediction of in-chamber performance, generation of a catalog of test results and other data, providing data for the plotting of isointensity lines, and other applications which are discussed. The ROADS system will collect, process, display, analyze, and retain data as required for components, partial subassemblies, complete subassemblies, complete modules, and multimodular arrays.

  19. Environmental Assessment for Taxiway Whiskey Supplemental Projects at Joint Base Andrews-Naval Air Facility Washington, Prince George’s County, Maryland

    DTIC Science & Technology

    2015-09-01

    associated duct banks and electrical components, and an airfield lighting vault are required. 1.3 SCOPE OF THE EA This EA evaluates the potential impacts on...Taxiway Whiskey. The east side work includes constructing an access road to serve the vault and installing a new 80-way duct bank connecting the east...Maryland September 2015 2-3 the East Runway and Taxiway Echo. On the west side of the airfield the duct bank servicing the airfield would be relocated

  20. KSC-2012-1863

    NASA Image and Video Library

    2012-02-17

    Space Shuttle Payloads: Kennedy Space Center was the hub for the final preparation and launch of the space shuttle and its payloads. The shuttle carried a wide variety of payloads into Earth orbit. Not all payloads were installed in the shuttle's cargo bay. In-cabin payloads were carried in the shuttle's middeck. Cargo bay payloads were typically large payloads which did not require a pressurized environment, such as interplanetary space probes, earth-orbiting satellites, scientific laboratories and International Space Station trusses and components. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA

  1. Sound Absorbers

    NASA Astrophysics Data System (ADS)

    Fuchs, H. V.; Möser, M.

    Sound absorption indicates the transformation of sound energy into heat. It is, for instance, employed to design the acoustics in rooms. The noise emitted by machinery and plants shall be reduced before arriving at a workplace; auditoria such as lecture rooms or concert halls require a certain reverberation time. Such design goals are realised by installing absorbing components at the walls with well-defined absorption characteristics, which are adjusted for corresponding demands. Sound absorbers also play an important role in acoustic capsules, ducts and screens to avoid sound immission from noise intensive environments into the neighbourhood.

  2. Shock absorbing mount for electrical components

    NASA Technical Reports Server (NTRS)

    Dillon, R. F., Jr.; Mayne, R. C. (Inventor)

    1975-01-01

    A shock mount for installing electrical components on circuit boards is described. The shock absorber is made of viscoelastic material which interconnects the electrical components. With this system, shocks imposed on one component of the circuit are not transmitted to other components. A diagram of a typical circuit is provided.

  3. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  4. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  5. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  6. 77 FR 36389 - Airworthiness Directives; Bell Helicopter Textron Canada, Limited, Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ...-temperature warning light, and based on those findings, installing an NVIS filter. This AD was prompted by the... over-temperature warning light by installing a filter to prevent degradation of the pilot's vision... require installing an NVIS filter, part number (P/N) ASU-TOTGAG-1. The proposed requirements were intended...

  7. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  8. 30 CFR 75.1710-1 - Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...

  9. 78 FR 4055 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...) Installation of New Relay and Wiring Bundle Change Within 24 months after the effective date of this AD: Change... requires installing a new relay and doing certain wiring changes of the entertainment control switch. We... proposed to require installing a new relay and doing certain wiring changes of the entertainment control...

  10. Floorcovering Installer: Apprenticeship Course Outline. Apprenticeship and Industry Training. 2909

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2009

    2009-01-01

    The graduate of the Floorcovering Installer apprenticeship program is a certified journeyperson who will be able: (1) Use efficiently and safely all hand and power operated equipment used by the Journeyperson Floorcovering Installer; (2) Read and interpret drawings in relation to the trade requirement. Estimate quantities of materials required and…

  11. Feasibility study of a 270V dc flat cable aircraft electrical power distributed system

    NASA Astrophysics Data System (ADS)

    Musga, M. J.; Rinehart, R. J.

    1982-01-01

    This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.

  12. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  13. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  14. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  15. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  16. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  17. Install active/passive neutron examination and assay (APNEA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1996-04-01

    This document describes activities pertinent to the installation of the prototype Active/Passive Neutron Examination and Assay (APNEA) system built in Area 336 into its specially designed trailer. It also documents the basic theory of operation, design and protective features, basic personnel training, and the proposed characterization site location at Lockheed Martin Specialty Components, Inc., (Specialty Components) with the estimated 10 mrem/year boundary. Additionally, the document includes the Preventive Change Analysis (PCA) form, and a checklist of items for verification prior to unrestricted system use.

  18. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Automatic fire sensors and manual actuators... § 75.1107-4 Automatic fire sensors and manual actuators; installation; minimum requirements. (a)(1... sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof...

  19. 40 CFR 63.3968 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...

  20. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  1. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  2. 40 CFR 63.3968 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...

  3. Effect of Component Failures on Economics of Distributed Photovoltaic Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lubin, Barry T.

    2012-02-02

    This report describes an applied research program to assess the realistic costs of grid connected photovoltaic (PV) installations. A Board of Advisors was assembled that included management from the regional electric power utilities, as well as other participants from companies that work in the electric power industry. Although the program started with the intention of addressing effective load carrying capacity (ELCC) for utility-owned photovoltaic installations, results from the literature study and recommendations from the Board of Advisors led investigators to the conclusion that obtaining effective data for this analysis would be difficult, if not impossible. The effort was then re-focusedmore » on assessing the realistic costs and economic valuations of grid-connected PV installations. The 17 kW PV installation on the University of Hartford's Lincoln Theater was used as one source of actual data. The change in objective required a more technically oriented group. The re-organized working group (changes made due to the need for more technically oriented participants) made site visits to medium-sized PV installations in Connecticut with the objective of developing sources of operating histories. An extensive literature review helped to focus efforts in several technical and economic subjects. The objective of determining the consequences of component failures on both generation and economic returns required three analyses. The first was a Monte-Carlo-based simulation model for failure occurrences and the resulting downtime. Published failure data, though limited, was used to verify the results. A second model was developed to predict the reduction in or loss of electrical generation related to the downtime due to these failures. Finally, a comprehensive economic analysis, including these failures, was developed to determine realistic net present values of installed PV arrays. Two types of societal benefits were explored, with quantitative valuations developed for both. Some societal benefits associated with financial benefits to the utility of having a distributed generation capacity that is not fossil-fuel based have been included into the economic models. Also included and quantified in the models are several benefits to society more generally: job creation and some estimates of benefits from avoiding greenhouse emissions. PV system failures result in a lowering of the economic values of a grid-connected system, but this turned out to be a surprisingly small effect on the overall economics. The most significant benefit noted resulted from including the societal benefits accrued to the utility. This provided a marked increase in the valuations of the array and made the overall value proposition a financially attractive one, in that net present values exceeded installation costs. These results indicate that the Department of Energy and state regulatory bodies should consider focusing on societal benefits that create economic value for the utility, confirm these quantitative values, and work to have them accepted by the utilities and reflected in the rate structures for power obtained from grid-connected arrays. Understanding and applying the economic benefits evident in this work can significantly improve the business case for grid-connected PV installations. This work also indicates that the societal benefits to the population are real and defensible, but not nearly as easy to justify in a business case as are the benefits that accrue directly to the utility.« less

  4. 24 CFR 3285.1 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...

  5. 24 CFR 3285.1 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...

  6. 49 CFR 195.254 - Above ground components.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Above ground components. 195.254 Section 195.254 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.254 Above ground components. (a) Any component may be installed above ground in...

  7. 49 CFR 195.254 - Above ground components.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Above ground components. 195.254 Section 195.254 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.254 Above ground components. (a) Any component may be installed above ground in...

  8. Liquid hydrogen turbopump ALS advanced development program. Volume 1: Hot fire unit

    NASA Technical Reports Server (NTRS)

    Lindley, Bruce

    1990-01-01

    The interface criteria for the Turbopump Test article (TPA) and the Component Test Facility located at NASA, Stennis Space Center is defined by this interface Control Document (ICD). TPA ICD Volume 2 is submitted for the Cold Gas Drive Turbopump Test Article, which is generally similar but incorporates certain changes, particularly in fluid requirements and in instrumentation needs. For the purposes of this ICD, the test article consists of the Hot Fire Drive Turbopump mounted on its test cart, readied for installation in the component test facility. It should be emphasized that the LH2 turbopump program is still in its early concept design phase. Design of the turbopump, test cart, and spools are subject to revisions until successful conclusion of the Detail Design Review (DDR).

  9. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...

  10. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...

  11. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...

  12. 76 FR 5505 - Airworthiness Directives; The Boeing Company Model 777-200 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... management units (ZMU) OPS, and the cabin system management unit (CSMU) OPS; installing OPS for the CSCP... require installing a new CSCP; installing a new cabin management system (CMS) CDB; and installing new OPS...), the zone management unit (ZMU) OPS, and the cabin system management unit (CSMU) OPS. Installing CSCP...

  13. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  14. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  15. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  16. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  17. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  18. Inexpensive economical solar heating system for homes (un sistema economico de calefaccion solar para viviendas)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred, J.W.; Shinn, J.M. Jr; Kirby, C.E.

    1976-07-01

    This report describes a low-cost solar home heating system to supplement the home-owner's present warm-air heating system. It has three parts: (1) A brief background on solar heating, (2) Langley's experience with a demonstration system, and (3) information for the home-owner who wishes to construct such a system. Instructions are given for a solar heating installation in which he supplies all labor needed to install off-the-shelf components estimated to cost $2000. These components, which include solar collector, heat exchanger, water pump, storage tank, piping, and controls to make the system completely automatic, are readily available at local lumber yards, hardwaremore » stores, and plumbing supply stores, and they are relatively simple to install. Manufacturers and prices of each component used and a rough cost analysis based on these prices are given for the owner's convenience. This report also gives performance data obtained from a demonstration system which has been built and tested at the Langley Research Center.« less

  19. The MOD-OA 200 kilowatt wind turbine generator design and analysis report

    NASA Astrophysics Data System (ADS)

    Andersen, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.; Lipner, M. H.; Schornhorst, J. R.

    1980-08-01

    The project requirements, approach, system description, design requirements, design, analysis, system tests, installation safety considerations, failure modes and effects analysis, data acquisition, and initial performance for the MOD-OA 200 kw wind turbine generator are discussed. The components, the rotor, driven train, nacelle equipment, yaw drive mechanism and brake, tower, foundation, electrical system, and control systems are presented. The rotor includes the blades, hub and pitch change mechanism. The drive train includes the low speed shaft, speed increaser, high speed shaft, and rotor brake. The electrical system includes the generator, switchgear, transformer, and utility connection. The control systems are the blade pitch, yaw, and generator control, and the safety system. Manual, automatic, and remote control and Dynamic loads and fatigue are analyzed.

  20. The MOD-OA 200 kilowatt wind turbine generator design and analysis report

    NASA Technical Reports Server (NTRS)

    Andersen, T. S.; Bodenschatz, C. A.; Eggers, A. G.; Hughes, P. S.; Lampe, R. F.; Lipner, M. H.; Schornhorst, J. R.

    1980-01-01

    The project requirements, approach, system description, design requirements, design, analysis, system tests, installation safety considerations, failure modes and effects analysis, data acquisition, and initial performance for the MOD-OA 200 kw wind turbine generator are discussed. The components, the rotor, driven train, nacelle equipment, yaw drive mechanism and brake, tower, foundation, electrical system, and control systems are presented. The rotor includes the blades, hub and pitch change mechanism. The drive train includes the low speed shaft, speed increaser, high speed shaft, and rotor brake. The electrical system includes the generator, switchgear, transformer, and utility connection. The control systems are the blade pitch, yaw, and generator control, and the safety system. Manual, automatic, and remote control and Dynamic loads and fatigue are analyzed.

  1. High-resolution global irradiance monitoring from photovoltaic systems

    NASA Astrophysics Data System (ADS)

    Buchmann, Tina; Pfeilsticker, Klaus; Siegmund, Alexander; Meilinger, Stefanie; Mayer, Bernhard; Pinitz, Sven; Steinbrecht, Wolfgang

    2016-04-01

    Reliable and regional differentiated power forecasts are required to guarantee an efficient and economic energy transition towards renewable energies. Amongst other renewable energy technologies, e.g. wind mills, photovoltaic systems are an essential component of this transition being cost-efficient and simply to install. Reliable power forecasts are however required for a grid integration of photovoltaic systems, which among other data requires high-resolution spatio-temporal global irradiance data. Hence the generation of robust reviewed global irradiance data is an essential contribution for the energy transition. To achieve this goal our studies introduce a novel method which makes use of photovoltaic power generation in order to infer global irradiance. The method allows to determine high-resolution temporal global irradiance data (one data point every 15 minutes at each location) from power data of operated photovoltaic systems. Due to the multitude of installed photovoltaic systems (in Germany) the detailed spatial coverage is much better than for example only using global irradiance data from conventional pyranometer networks (e.g. from the German Weather Service). Our designated method is composed of two components: a forward component, i.e. to conclude from predicted global irradiance to photovoltaic (PV) power, and a backward component, i.e. from PV power with suitable calibration to global irradiance. The forward process is modelled by using the radiation transport model libRadtran (B. Mayer and A. Kylling (1)) for clear skies to obtain the characteristics (orientation, size, temperature dependence, …) of individual PV systems. For PV systems in the vicinity of a meteorological station, these data are validated against calibrated pyranometer readings. The forward-modelled global irradiance is used to determine the power efficiency for each photovoltaic system using non-linear optimisation techniques. The backward component uses the power efficiency and meteorological parameters (e.g. from the model COSMO-DE) to calculate global irradiance by means of the generated power of individual photovoltaic systems. For the year 2012, our method is tested for PV systems in the Allgäu region (south Germany), the distribution area of the system operator "AllgäuNetz GmbH & Co". The test region includes 215 online-monitored photovoltaic systems and one pyranometer station located at the DWD (Deutscher WetterDienst) weather station Hohenpeißenberg (operated by the German Weather Service). The present talk provides an introduction to the newly developed method along with first results for clear sky scenarios. (1) B. Mayer and A. Kylling (2005): Technical note: The libRadtran software package for radiative transfer calculations - description and examples of use. In: Chemistry and Physics Chemistry and Physics. Page: 1855 - 1877

  2. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...

  3. Airplane Airworthiness; Transport Categories

    DTIC Science & Technology

    1962-09-01

    4b.391 ----- 124 Subpart E-Powerplant Installation General ------------------------------------------------------------- 4b. 400 ----- 124...Engine and propeller operation (FAA policies which apply to see. 4b. 400 ) - 4b. 400 -1 -- - 125 Powerplant installation components (FAA interpretations...which apply to sec. 4b. 400 ) -------------------------------------------- 4b. 400 -2 --- 125 Eagines

  4. 46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...

  5. 46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...

  6. 46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...

  7. 24 CFR 3285.906 - Telephone and cable TV.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...

  8. Models for Deploying Open Source and Commercial Software to Support Earth Science Data Processing and Distribution

    NASA Astrophysics Data System (ADS)

    Yetman, G.; Downs, R. R.

    2011-12-01

    Software deployment is needed to process and distribute scientific data throughout the data lifecycle. Developing software in-house can take software development teams away from other software development projects and can require efforts to maintain the software over time. Adopting and reusing software and system modules that have been previously developed by others can reduce in-house software development and maintenance costs and can contribute to the quality of the system being developed. A variety of models are available for reusing and deploying software and systems that have been developed by others. These deployment models include open source software, vendor-supported open source software, commercial software, and combinations of these approaches. Deployment in Earth science data processing and distribution has demonstrated the advantages and drawbacks of each model. Deploying open source software offers advantages for developing and maintaining scientific data processing systems and applications. By joining an open source community that is developing a particular system module or application, a scientific data processing team can contribute to aspects of the software development without having to commit to developing the software alone. Communities of interested developers can share the work while focusing on activities that utilize in-house expertise and addresses internal requirements. Maintenance is also shared by members of the community. Deploying vendor-supported open source software offers similar advantages to open source software. However, by procuring the services of a vendor, the in-house team can rely on the vendor to provide, install, and maintain the software over time. Vendor-supported open source software may be ideal for teams that recognize the value of an open source software component or application and would like to contribute to the effort, but do not have the time or expertise to contribute extensively. Vendor-supported software may also have the additional benefits of guaranteed up-time, bug fixes, and vendor-added enhancements. Deploying commercial software can be advantageous for obtaining system or software components offered by a vendor that meet in-house requirements. The vendor can be contracted to provide installation, support and maintenance services as needed. Combining these options offers a menu of choices, enabling selection of system components or software modules that meet the evolving requirements encountered throughout the scientific data lifecycle.

  9. The Logistics Of Installing Pacs In An Existing Medical Center

    NASA Astrophysics Data System (ADS)

    Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.

    1989-05-01

    A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.

  10. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  11. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  12. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  13. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  14. Relationship of credit attitude and debt to self-esteem and locus of control in college-age consumers.

    PubMed

    Pinto, Mary Beth; Mansfield, Phylis M; Parente, Diane H

    2004-06-01

    College-age consumers are one of the groups most highly targeted by credit card marketers. While some college students use their credit cards wisely, others are unable to control their spending. The objective of this study was to investigate differences in attitude toward credit cards and the psychological factors of self-esteem and locus of control among college students who possess one or more credit cards. Attitude was operationalized to include three underlying components: cognitive, affective, and behavioral. We separated credit users into subcategories based on amount of installment debt. Convenience users were defined as those consumers who paid the credit-card balance in full each month. Installment users were classified as consumers who carried a balance month-to-month. Convenience users were compared to mild and heavy installment users to assess significance of differences in attitudinal and psychological factors. There were no significant differences in the psychological factors across the credit-card user groups. In addition, there was a statistically significant difference on each of the attitude components (knowledge/beliefs, affect, and behavior) across user groups; convenience users, mild installment, and heavy installment users.

  15. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  16. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  17. 14 CFR 23.1195 - Fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... systems must be installed and compliance shown with the following: (1) Except for combustor, turbine, and tailpipe sections of turbine-engine installations that contain lines or components carrying flammable fluids or gases for which a fire originating in these sections is shown to be controllable, a fire...

  18. 32 CFR 213.5 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SUPPORT FOR NON-FEDERAL ENTITIES AUTHORIZED TO OPERATE ON DOD INSTALLATIONS § 213.5 Responsibilities. (a... policy matters and Office of the Secretary of Defense oversight of non-Federal entities on DoD... of non-Federal entities on DoD installations. (3) Assign responsibilities to the DoD Components to...

  19. 32 CFR 213.5 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SUPPORT FOR NON-FEDERAL ENTITIES AUTHORIZED TO OPERATE ON DOD INSTALLATIONS § 213.5 Responsibilities. (a... policy matters and Office of the Secretary of Defense oversight of non-Federal entities on DoD... of non-Federal entities on DoD installations. (3) Assign responsibilities to the DoD Components to...

  20. 32 CFR 213.5 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SUPPORT FOR NON-FEDERAL ENTITIES AUTHORIZED TO OPERATE ON DOD INSTALLATIONS § 213.5 Responsibilities. (a... policy matters and Office of the Secretary of Defense oversight of non-Federal entities on DoD... of non-Federal entities on DoD installations. (3) Assign responsibilities to the DoD Components to...

  1. 32 CFR 213.5 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SUPPORT FOR NON-FEDERAL ENTITIES AUTHORIZED TO OPERATE ON DOD INSTALLATIONS § 213.5 Responsibilities. (a... policy matters and Office of the Secretary of Defense oversight of non-Federal entities on DoD... of non-Federal entities on DoD installations. (3) Assign responsibilities to the DoD Components to...

  2. 32 CFR 213.5 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SUPPORT FOR NON-FEDERAL ENTITIES AUTHORIZED TO OPERATE ON DOD INSTALLATIONS § 213.5 Responsibilities. (a... policy matters and Office of the Secretary of Defense oversight of non-Federal entities on DoD... of non-Federal entities on DoD installations. (3) Assign responsibilities to the DoD Components to...

  3. 3.0 Tesla magnetic resonance imaging: A new standard in liver imaging?

    PubMed Central

    Girometti, Rossano

    2015-01-01

    An ever-increasing number of 3.0 Tesla (T) magnets are installed worldwide. Moving from the standard of 1.5 T to higher field strength implies a number of potential advantage and drawbacks, requiring careful optimization of imaging protocols or implementation of novel hardware components. Clinical practice and literature review suggest that state-of-the-art 3.0 T is equivalent to 1.5 T in the assessment of focal liver lesions and diffuse liver disease. Therefore, further technical improvements are needed in order to fully exploit the potential of higher field strength. PMID:26244063

  4. 3.0 Tesla magnetic resonance imaging: A new standard in liver imaging?

    PubMed

    Girometti, Rossano

    2015-07-28

    An ever-increasing number of 3.0 Tesla (T) magnets are installed worldwide. Moving from the standard of 1.5 T to higher field strength implies a number of potential advantage and drawbacks, requiring careful optimization of imaging protocols or implementation of novel hardware components. Clinical practice and literature review suggest that state-of-the-art 3.0 T is equivalent to 1.5 T in the assessment of focal liver lesions and diffuse liver disease. Therefore, further technical improvements are needed in order to fully exploit the potential of higher field strength.

  5. Using Microporous Polytetrafluoroethylene Thin Sheets as a Flexible Solar Diffuser to Minimize Sunlight Glint to Cameras in Space

    NASA Technical Reports Server (NTRS)

    Choi, Michael K.

    2016-01-01

    An innovative design of using microporous PTFE thin sheets as a solar diffuser for MLI blankets or mechanical structure has been developed. It minimizes sunlight or stray-light glint to cameras when it is incident on these components in space. A microporous black PTFE thin sheet solar diffuser has been qualified for flight at NASA GSFC and installed to the TAGSAM arm MLI, OCAMS PolyCam sunshade MLI and SamCam motor riser MLI in the NASA OSIRIS-REx mission to meet the SamCam camera BRDF requirement.

  6. Using microporous polytetrafluoroethylene thin sheets as a flexible solar diffuser to minimize sunlight glint to cameras in space

    NASA Astrophysics Data System (ADS)

    Choi, Michael K.

    2016-09-01

    An innovative design of using microporous PTFE thin sheets as a solar diffuser for MLI blankets or mechanical structure has been developed. It minimizes sunlight or stray-light glint to cameras when it is incident on these components in space. A microporous black PTFE thin sheet solar diffuser has been qualified for flight at NASA GSFC and installed to the TAGSAM arm MLI, OCAMS PolyCam sunshade MLI and SamCam motor riser MLI in the NASA OSIRIS-REx mission to meet the SamCam camera BRDF requirement.

  7. Evaluation of a hospital-wide PACS: costs and benefits of the Hammersmith PACS installation

    NASA Astrophysics Data System (ADS)

    Bryan, Stirling; Keen, Justin; Buxton, Martin J.; Weatherburn, Gwyneth C.

    1992-07-01

    The unusual nature of sites chosen for hospital-wide PACS implementations and the very small number of proposed implementations make evaluation a complex task. The UK Department of Health is funding both the evaluation and implementation of a hospital-wide PACS. The Brunel University evaluation of the Hammersmith Hospital PACS has two main components: an economic evaluation of the costs and benefits of hospital-wide PACS installations and an exercise in monitoring the implementation process. This paper concentrates on the economic component.

  8. Multimodal audio guide for museums and exhibitions

    NASA Astrophysics Data System (ADS)

    Gebbensleben, Sandra; Dittmann, Jana; Vielhauer, Claus

    2006-02-01

    In our paper we introduce a new Audio Guide concept for exploring buildings, realms and exhibitions. Actual proposed solutions work in most cases with pre-defined devices, which users have to buy or borrow. These systems often go along with complex technical installations and require a great degree of user training for device handling. Furthermore, the activation of audio commentary related to the exhibition objects is typically based on additional components like infrared, radio frequency or GPS technology. Beside the necessity of installation of specific devices for user location, these approaches often only support automatic activation with no or limited user interaction. Therefore, elaboration of alternative concepts appears worthwhile. Motivated by these aspects, we introduce a new concept based on usage of the visitor's own mobile smart phone. The advantages in our approach are twofold: firstly the Audio Guide can be used in various places without any purchase and extensive installation of additional components in or around the exhibition object. Secondly, the visitors can experience the exhibition on individual tours only by uploading the Audio Guide at a single point of entry, the Audio Guide Service Counter, and keeping it on her or his personal device. Furthermore, since the user usually is quite familiar with the interface of her or his phone and can thus interact with the application device easily. Our technical concept makes use of two general ideas for location detection and activation. Firstly, we suggest an enhanced interactive number based activation by exploiting the visual capabilities of modern smart phones and secondly we outline an active digital audio watermarking approach, where information about objects are transmitted via an analog audio channel.

  9. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  10. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  11. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...

  12. 78 FR 1765 - Requirements for Chemical Oxygen Generators Installed on Transport Category Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... the supplemental oxygen supply can also complicate activating the oxygen flow, since that is generally... oxygen quantity requirements of Sec. 25.1443, Minimum mass flow of supplemental oxygen. E. Related...-0812; Notice No. 13-01] RIN 2120-AK14 Requirements for Chemical Oxygen Generators Installed on...

  13. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... arrangement. (6) Machinery installation. (7) Electrical installation. (8) Fire control plan. (9) Fuel tanks... 46 Shipping 7 2014-10-01 2014-10-01 false Plans required. 169.305 Section 169.305 Shipping COAST... and Arrangement Plans § 169.305 Plans required. (a) Except as provided in paragraphs (b) and (c) of...

  14. 46 CFR 169.305 - Plans required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... arrangement. (6) Machinery installation. (7) Electrical installation. (8) Fire control plan. (9) Fuel tanks... 46 Shipping 7 2012-10-01 2012-10-01 false Plans required. 169.305 Section 169.305 Shipping COAST... and Arrangement Plans § 169.305 Plans required. (a) Except as provided in paragraphs (b) and (c) of...

  15. Component Database for the APS Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Veseli, S.; Arnold, N. D.; Jarosz, D. P.

    The Advanced Photon Source Upgrade (APS-U) project will replace the existing APS storage ring with a multi-bend achromat (MBA) lattice to provide extreme transverse coherence and extreme brightness x-rays to its users. As the time to replace the existing storage ring accelerator is of critical concern, an aggressive one-year removal/installation/testing period is being planned. To aid in the management of the thousands of components to be installed in such a short time, the Component Database (CDB) application is being developed with the purpose to identify, document, track, locate, and organize components in a central database. Three major domains are beingmore » addressed: Component definitions (which together make up an exhaustive "Component Catalog"), Designs (groupings of components to create subsystems), and Component Instances (“Inventory”). Relationships between the major domains offer additional "system knowledge" to be captured that will be leveraged with future tools and applications. It is imperative to provide sub-system engineers with a functional application early in the machine design cycle. Topics discussed in this paper include the initial design and deployment of CDB, as well as future development plans.« less

  16. The design of a wireless batteryless biflash installation with high power LEDs

    NASA Astrophysics Data System (ADS)

    Cappelle, J.; De Geest, W.; Hanselaer, P.

    2011-05-01

    Adding flashlights at crosswalks may make these weak traffic points safer. Unfortunately plugging in traffic lights into the electrical grid is expensive and complex. This paper reports about the energetic, the electronic and the optical design and building of a wireless and batteryless biflash installation in the framework of a flemish SME supporting program. The energy is supplied by a small solar panel and is buffered by supercapacitors instead of batteries. This has the advantage of being maintenance free: the number of charge-discharge cycles is almost unlimited because there is no chemical reaction involved in the storage mechanism. On the other hand the limited energy storage capacity of supercapacitors requires a new approach for the system design. Based on the EN-12352 standard for warning light devices, all design choices were filled in to be as energy efficient as possible. The duty cycle and the light output of the high power led flashlights are minimized. The components for the electronic circuits for the led driver, the control and the RF communication are selected based on their energy consumption and power management techniques are implemented. A lot of energy is saved by making the biflash system active. The leds are only flashing on demand or at preprogrammed moments. A biflash installation is typically installed at both sides of a crosswalk. A call at one of the sides should result in flashing at both sides. To maintain the drag and drop principle, a wireless RF communication system is designed.

  17. Superconducting gravimeters reveal unprecedented details of changes related to volcanic processes

    NASA Astrophysics Data System (ADS)

    Carbone, Daniele; Greco, Filippo; Cannavò, Flavio

    2017-04-01

    Continuous gravity measurements have been successfully carried out at a number of volcanoes around the world using spring gravimeters. Nevertheless, these instruments do not provide reliable measurements when used in continuous mode for weeks or more, because they are influenced by environmental factors and are subject to instrumental drift. Accordingly, most studies of continuous gravity at active volcanoes have focused on the analysis of changes over time-scales of minutes to a few days. An alternative to spring gravimeters for continuous measurements is given by superconducting gravimeters (SGs) that feature a much higher precision and stability than spring gravimeters. However, even the most portable SGs (e.g., the iGrav® by GWR) are not ideal for installation in the vicinity of active volcanic structures. Indeed, they require AC power at the installation site and some kind of hut or vault to house the instrumentation. At Mt. Etna, the installation of a mini-array of three SGs (distances of 3.5 to 15.5 km from the active craters) was begun in September 2014. To our knowledge, these are the first SGs ever installed on an active volcano. Signals from these instruments show hydrologically-induced components superimposed on small (a few microGal) gravity changes that are related to volcanic processes. Such changes, occurring over periods of minutes to weeks, would not be observable by spring gravimeters due to their intrinsic limitations regarding precision and long-term stability.

  18. 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less

  19. Technical Report: Installed Cost Benchmarks and Deployment Barriers for

    Science.gov Websites

    Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage Q1 2016 Installed Cost Benchmarks and Deployment Barriers for Residential Solar with Energy Storage Researchers from NREL published a report that provides detailed component and system-level cost breakdowns for

  20. 78 FR 77108 - Surplus Property Notice at a Military Installation Designated for Disposal: Pueblo Chemical Depot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... DEPARTMENT OF DEFENSE Department of the Army Surplus Property Notice at a Military Installation Designated for Disposal: Pueblo Chemical Depot, Colorado AGENCY: Department of the Army, DoD. ACTION: Notice..., as approved, and following screening with Federal agencies and Department of Defense components...

  1. 30 CFR 7.506 - Breathable air components.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cylinders, or boreholes with fans installed on the surface or compressors installed on the surface. Only....5 percent. (c) Breathable air supplied by compressed air from cylinders, fans, or compressors shall provide a minimum flow rate of 12.5 cubic feet per minute of breathable air for each person. (1) Fans or...

  2. Computerized systems analysis and optimization of aircraft engine performance, weight, and life cycle costs

    NASA Technical Reports Server (NTRS)

    Fishbach, L. H.

    1979-01-01

    The computational techniques utilized to determine the optimum propulsion systems for future aircraft applications and to identify system tradeoffs and technology requirements are described. The characteristics and use of the following computer codes are discussed: (1) NNEP - a very general cycle analysis code that can assemble an arbitrary matrix fans, turbines, ducts, shafts, etc., into a complete gas turbine engine and compute on- and off-design thermodynamic performance; (2) WATE - a preliminary design procedure for calculating engine weight using the component characteristics determined by NNEP; (3) POD DRG - a table look-up program to calculate wave and friction drag of nacelles; (4) LIFCYC - a computer code developed to calculate life cycle costs of engines based on the output from WATE; and (5) INSTAL - a computer code developed to calculate installation effects, inlet performance and inlet weight. Examples are given to illustrate how these computer techniques can be applied to analyze and optimize propulsion system fuel consumption, weight, and cost for representative types of aircraft and missions.

  3. Advanced Distributed Measurements and Data Processing at the Vibro-Acoustic Test Facility, GRC Space Power Facility, Sandusky, Ohio - an Architecture and an Example

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Evans, Richard K.

    2009-01-01

    A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.

  4. 24 CFR 3286.103 - DAPIA-approved installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... instructions for the home. (2) If the installation requires a design that is different from that provided by... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... purchaser or lessee. (1) For each manufactured home sold or leased to a purchaser or lessee, the retailer...

  5. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Wire rope-selection and installation criteria. 1926.1414... Derricks in Construction § 1926.1414 Wire rope—selection and installation criteria. (a) Original equipment wire rope and replacement wire rope must be selected and installed in accordance with the requirements...

  6. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  7. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  8. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  9. 46 CFR 167.40-1 - Electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...

  10. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  11. Program for life extension and preserving existing resources for motor control center components [nuclear plants

    NASA Astrophysics Data System (ADS)

    Sanwarwalla, M. H.; Alsammarae, A. J.

    1995-08-01

    Many nuclear power plants have motor control centers (MCCs) installed in a harsh, radiation only, environment. Procurement of safety-related replacement devices for these MCCs is an economic burden for the stations if these MCCs have become obsolete. Identical replacement components for many MCCs installed in older plants (ITE Gould, Allis-Chalmers, Klockner-Moeller, Cutler-Hammer, etc.) are no longer available. Plants are left with the option of either retrofitting these MCCs or finding ways to extend the qualified lives of the safety-related components to minimize replacement costs. ComEd nuclear station has embarked on a program to minimize the economic burden for the replacement of Klockner-Moeller (K-M) MCC components. This paper discusses the program adopted by this station and its economic benefits to ComEd.

  12. Projection display technology for avionics applications

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.; Tompkins, Richard D.

    2000-08-01

    Avionics displays often require custom image sources tailored to demanding program needs. Flat panel devices are attractive for cockpit installations, however recent history has shown that it is not possible to sustain a business manufacturing custom flat panels in small volume specialty runs. As the number of suppliers willing to undertake this effort shrinks, avionics programs unable to utilize commercial-off-the-shelf (COTS) flat panels are placed in serious jeopardy. Rear projection technology offers a new paradigm, enabling compact systems to be tailored to specific platform needs while using a complement of COTS components. Projection displays enable improved performance, lower cost and shorter development cycles based on inter-program commonality and the wide use of commercial components. This paper reviews the promise and challenges of projection technology and provides an overview of Kaiser Electronics' efforts in developing advanced avionics displays using this approach.

  13. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1979-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after five years' service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 150 C (300 F) service aft engine fairing. The fairings have accumulated a total of 40,534 hours, with one ship set having 16,091 hours service as of Feb. 11, 1979. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.

  14. Verification of International Space Station Component Leak Rates by Helium Accumulation Method

    NASA Technical Reports Server (NTRS)

    Underwood, Steve D.; Smith, Sherry L.

    2003-01-01

    Discovery of leakage on several International Space Station U.S. Laboratory Module ammonia system quick disconnects (QDs) led to the need for a process to quantify total leakage without removing the QDs from the system. An innovative solution was proposed allowing quantitative leak rate measurement at ambient external pressure without QD removal. The method utilizes a helium mass spectrometer configured in the detector probe mode to determine helium leak rates inside a containment hood installed on the test component. The method was validated through extensive developmental testing. Test results showed the method was viable, accurate and repeatable for a wide range of leak rates. The accumulation method has been accepted by NASA and is currently being used by Boeing Huntsville, Boeing Kennedy Space Center and Boeing Johnson Space Center to test welds and valves and will be used by Alenia to test the Cupola. The method has been used in place of more expensive vacuum chamber testing which requires removing the test component from the system.

  15. Operational limits on WEST inertial divertor sector during the early phase experiment

    NASA Astrophysics Data System (ADS)

    Firdaouss, M.; Corre, Y.; Languille, P.; Greuner, H.; Autissier, E.; Desgranges, C.; Guilhem, D.; Gunn, J. P.; Lipa, M.; Missirlian, M.; Pascal, J.-Y.; Pocheau, C.; Richou, M.; Tsitrone, E.

    2016-02-01

    The primary goal of the WEST project is to be a test bed to characterize the fatigue and lifetime of ITER-like W divertor components subjected to relevant thermal loads. During the first phase of exploitation (S2 2016), these components (W monoblock plasma facing unit—W-PFU) will be installed in conjunction with graphite components (G-PFU). Since the G-PFU will not be actively cooled, it is necessary to ensure the expected pulse duration allows the W-PFU to reach its steady state without overheating the G-PFU assembly structure or the embedded stainless-steel diagnostics. High heat flux tests were performed at the GLADIS facility to assess the thermal behavior of the G-PFU. Some operational limits based on plasma parameters were determined. It was found that it is possible to operate at an injected power such that the maximal incident heat flux on the lower divertor is 10 MW m-2 for the required pulse length.

  16. Development of high purity large forgings for nuclear power plants

    NASA Astrophysics Data System (ADS)

    Tanaka, Yasuhiko; Sato, Ikuo

    2011-10-01

    The recent increase in the size of energy plants has been supported by the development of manufacturing technology for high purity large forgings for the key components of the plant. To assure the reliability and performance of the large forgings, refining technology to make high purity steels, casting technology for gigantic ingots, forging technology to homogenize the material and consolidate porosity are essential, together with the required heat treatment and machining technologies. To meet these needs, the double degassing method to reduce impurities, multi-pouring methods to cast the gigantic ingots, vacuum carbon deoxidization, the warm forging process and related technologies have been developed and further improved. Furthermore, melting facilities including vacuum induction melting and electro slag re-melting furnaces have been installed. By using these technologies and equipment, large forgings have been manufactured and shipped to customers. These technologies have also been applied to the manufacture of austenitic steel vessel components of the fast breeder reactors and components for fusion experiments.

  17. Optimization of Borehole Thermal Energy Storage System Design Using Comprehensive Coupled Simulation Models

    NASA Astrophysics Data System (ADS)

    Welsch, Bastian; Rühaak, Wolfram; Schulte, Daniel O.; Formhals, Julian; Bär, Kristian; Sass, Ingo

    2017-04-01

    Large-scale borehole thermal energy storage (BTES) is a promising technology in the development of sustainable, renewable and low-emission district heating concepts. Such systems consist of several components and assemblies like the borehole heat exchangers (BHE), other heat sources (e.g. solarthermics, combined heat and power plants, peak load boilers, heat pumps), distribution networks and heating installations. The complexity of these systems necessitates numerical simulations in the design and planning phase. Generally, the subsurface components are simulated separately from the above ground components of the district heating system. However, as fluid and heat are exchanged, the subsystems interact with each other and thereby mutually affect their performances. For a proper design of the overall system, it is therefore imperative to take into account the interdependencies of the subsystems. Based on a TCP/IP communication we have developed an interface for the coupling of a simulation package for heating installations with a finite element software for the modeling of the heat flow in the subsurface and the underground installations. This allows for a co-simulation of all system components, whereby the interaction of the different subsystems is considered. Furthermore, the concept allows for a mathematical optimization of the components and the operational parameters. Consequently, a finer adjustment of the system can be ensured and a more precise prognosis of the system's performance can be realized.

  18. Evolution of optical fibre cabling components at CERN: Performance and technology trends analysis

    NASA Astrophysics Data System (ADS)

    Shoaie, Mohammad Amin; Meroli, Stefano; Machado, Simao; Ricci, Daniel

    2018-05-01

    CERN optical fibre infrastructure has been growing constantly over the past decade due to ever increasing connectivity demands. The provisioning plan and fibre installation of this vast laboratory is performed by Fibre Optics and Cabling Section at Engineering Department. In this paper we analyze the procurement data for essential fibre cabling components during a five-year interval to extract the existing trends and anticipate future directions. The analysis predicts high contribution of LC connector and an increasing usage of multi-fibre connectors. It is foreseen that single-mode fibres become the main fibre type for mid and long-range installations while air blowing would be the major installation technique. Performance assessment of various connectors shows that the expanded beam ferrule is favored for emerging on-board optical interconnections thanks to its scalable density and stable return-loss.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    R.Raman

    The CT injector originally used for injecting CTs into 1T toroidal field discharges in the TdeV tokamak was shipped PPPL from the Affiliated Customs Brokers storage facility in Montreal during November 2002. All components were transported safely, without damage, and are currently in storage at PPPL, waiting for further funding in order to begin advanced fueling experiments on NSTX. The components are currently insured through the University of Washington. Several technical presentations were made to investigate the feasibility of the CT injector installation on NSTX. These technical presentations, attached to this document, were: (1) Motivation for Compact Toroida Injection inmore » NSTX; (2) Assessment of the Engineering Feasibility of Installing CTF-II on NSTX; (3) Assessment of the Cost for CT Installation on NSTX--A Peer Review; and (4) CT Fueling for NSTX FY 04-08 steady-state operation needs.« less

  20. 30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...

  1. 30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...

  2. 30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...

  3. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  4. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  5. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  6. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  7. NASA Electric Aircraft Test Bed (NEAT) Development Plan - Design, Fabrication, Installation

    NASA Technical Reports Server (NTRS)

    Dyson, Rodger W.

    2016-01-01

    As large airline companies compete to reduce emissions, fuel, noise, and maintenance costs, it is expected that more of their aircraft systems will shift from using turbofan propulsion, pneumatic bleed power, and hydraulic actuation, to instead using electrical motor propulsion, generator power, and electrical actuation. This requires new flight-weight and flight-efficient powertrain components, fault tolerant power management, and electromagnetic interference mitigation technologies. Moreover, initial studies indicate some combination of ambient and cryogenic thermal management and relatively high bus voltages when compared to state of practice will be required to achieve a net system benefit. Developing all these powertrain technologies within a realistic aircraft architectural geometry and under realistic operational conditions requires a unique electric aircraft testbed. This report will summarize existing testbed capabilities located in the U.S. and details the development of a unique complementary testbed that industry and government can utilize to further mature electric aircraft technologies.

  8. Development Studies for a Novel Wet Oxidation Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delphi Research

    1999-09-30

    DETOX is a catalyzed wet oxidation process that destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase III effort for this project is fabrication, assembly, and installation of the DETOX demonstration unit, preparation of documentation and training to meet site requirements formore » operation, followed by system run-in and shakedown testing of the unit prior to demonstration testing. The Title III design was completed and the unit was fabricated according to standards set forth by OSHA, EPA, the American Petroleum Institute (i.e., chemical and petroleum industry standards), and the ASME B-313 Piping Code requirements as agreed to in preliminary design meetings with primary stakeholders. The unit was assembled in three modules and two trailers and then shipped to the TNX facility at the Savannah River Site in September and october of 1996. On-going site integration tasks were address while delays in installation arose due to funding sources and costs. In March of 1997, Delphi was authorized to proceed with the installation of the unit, making electrical and mechanical connections necessary to operate the unit. All installation tasks were completed in August of 1997. Results of an Operational Readiness Review conducted in August 1997 verified that Delphi's procedures and documentation met the necessary requirements to operate the unit at SRS. Completion of the final checklist of WSRC requirements was then addressed including the Owner's Independent Inspection Report, verifying all components of the unit met B-31.3 standards. Final hydraulic and pneumatic tests were completed in November to satisfy the B-31.3 requirement. During the month of December, the control system and heating and cooling systems were then prepared to initiate system startup and conduct the run-in tests. Shakedown tests were combined with the Phase IV tasks due to DOE funding constraints, i.e., tests formerly planned to be conducted with oil and solid materials were deferred to Phase IV and combined with similar testing. Once run-in testing has been completed, the primary objectives of Phase III will have been achieved and the project will be ready to proceed to demonstration testing (Phase IV).« less

  9. Canary: an atomic pipeline for clinical amplicon assays.

    PubMed

    Doig, Kenneth D; Ellul, Jason; Fellowes, Andrew; Thompson, Ella R; Ryland, Georgina; Blombery, Piers; Papenfuss, Anthony T; Fox, Stephen B

    2017-12-15

    High throughput sequencing requires bioinformatics pipelines to process large volumes of data into meaningful variants that can be translated into a clinical report. These pipelines often suffer from a number of shortcomings: they lack robustness and have many components written in multiple languages, each with a variety of resource requirements. Pipeline components must be linked together with a workflow system to achieve the processing of FASTQ files through to a VCF file of variants. Crafting these pipelines requires considerable bioinformatics and IT skills beyond the reach of many clinical laboratories. Here we present Canary, a single program that can be run on a laptop, which takes FASTQ files from amplicon assays through to an annotated VCF file ready for clinical analysis. Canary can be installed and run with a single command using Docker containerization or run as a single JAR file on a wide range of platforms. Although it is a single utility, Canary performs all the functions present in more complex and unwieldy pipelines. All variants identified by Canary are 3' shifted and represented in their most parsimonious form to provide a consistent nomenclature, irrespective of sequencing variation. Further, proximate in-phase variants are represented as a single HGVS 'delins' variant. This allows for correct nomenclature and consequences to be ascribed to complex multi-nucleotide polymorphisms (MNPs), which are otherwise difficult to represent and interpret. Variants can also be annotated with hundreds of attributes sourced from MyVariant.info to give up to date details on pathogenicity, population statistics and in-silico predictors. Canary has been used at the Peter MacCallum Cancer Centre in Melbourne for the last 2 years for the processing of clinical sequencing data. By encapsulating clinical features in a single, easily installed executable, Canary makes sequencing more accessible to all pathology laboratories. Canary is available for download as source or a Docker image at https://github.com/PapenfussLab/Canary under a GPL-3.0 License.

  10. An airline study of advanced technology requirements for advanced high speed commercial transport engines. 1: Engine design study assessment

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1973-01-01

    The advanced technology requirements for an advanced high speed commercial tranport engine are presented. The results of the phase 1 study effort cover the following areas: (1) statement of an airline's major objectives for future transport engines, (2) airline's method of evaluating engine proposals, (3) description of an optimum engine for a long range subsonic commercial transport including installation and critical design features, (4) discussion of engine performance problems and experience with performance degradation, (5) trends in engine and pod prices with increasing technology and objectives for the future, (6) discussion of the research objectives for composites, reversers, advanced components, engine control systems, and devices to reduce the impact of engine stall, and (7) discussion of the airline objectives for noise and pollution reduction.

  11. 33 CFR 150.515 - What are the requirements for weight testing of newly installed or relocated craft?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... weight testing of newly installed or relocated craft? 150.515 Section 150.515 Navigation and Navigable... testing of newly installed or relocated craft? (a) The operator must perform installation weight testing... (a) of this section, when survival crafts are relocated to another deepwater port. ...

  12. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  13. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  14. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  15. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY... installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  16. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  17. Hazardous Materials Pharmacies - A Vital Component of a Robust P2 Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCarter, S.

    2006-07-01

    Integrating pollution prevention (P2) into the Department of Energy Integrated Safety Management (ISM) - Environmental Management System (EMS) approach, required by DOE Order 450.1, leads to an enhanced ISM program at large and complex installations and facilities. One of the building blocks to integrating P2 into a comprehensive environmental and safety program is the control and tracking of the amounts, types, and flow of hazardous materials used on a facility. Hazardous materials pharmacies (typically called HazMarts) provide a solid approach to resolving this issue through business practice changes that reduce use, avoid excess, and redistribute surplus. If understood from conceptmore » to implementation, the HazMart is a powerful tool for reducing pollution at the source, tracking inventory storage, controlling usage and flow, and summarizing data for reporting requirements. Pharmacy options can range from a strict, single control point for all hazardous materials to a virtual system, where the inventory is user controlled and reported over a common system. Designing and implementing HazMarts on large, diverse installations or facilities present a unique set of issues. This is especially true of research and development (R and D) facilities where the chemical use requirements are extensive and often classified. There are often multiple sources of supply; a wide variety of chemical requirements; a mix of containers ranging from small ampoules to large bulk storage tanks; and a wide range of tools used to track hazardous materials, ranging from simple purchase inventories to sophisticated tracking software. Computer systems are often not uniform in capacity, capability, or operating systems, making it difficult to use a server-based unified tracking system software. Each of these issues has a solution or set of solutions tied to fundamental business practices. Each requires an understanding of the problem at hand, which, in turn, requires good communication among all potential users. A key attribute to a successful HazMart is that everybody must use the same program. That requirement often runs directly into the biggest issue of all... institutional resistance to change. To be successful, the program has to be both a top-down and bottom-up driven process. The installation or facility must set the policy and the requirement, but all of the players have to buy in and participate in building and implementing the program. Dynamac's years of experience assessing hazardous materials programs, providing business case analyses, and recommending and implementing pharmacy approaches for federal agencies has provided us with key insights into the issues, problems, and the array of solutions available. This paper presents the key steps required to implement a HazMart, explores the advantages and pitfalls associated with a HazMart, and presents some options for implementing a pharmacy or HazMart on complex installations and R and D facilities. (authors)« less

  18. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, J.R.; Bailey, S.; Bower, J.C.

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide alsomore » includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.« less

  19. Smart home in a box: usability study for a large scale self-installation of smart home technologies.

    PubMed

    Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen

    2016-07-01

    This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.

  20. Smart home in a box: usability study for a large scale self-installation of smart home technologies

    PubMed Central

    Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen

    2017-01-01

    This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390

  1. Hubble Space Telescope Program on STS-95 Supported by Space Acceleration Measurement System for Free Flyers

    NASA Technical Reports Server (NTRS)

    Kacpura, Thomas J.

    2000-01-01

    John Glenn's historic return to space was a primary focus of the STS 95 space shuttle mission; however, the 83 science payloads aboard were the focus of the flight activities. One of the payloads, the Hubble Space Telescope Orbital System Test (HOST), was flown in the cargo bay by the NASA Goddard Space Flight Center. It served as a space flight test of upgrade components for the telescope before they are installed in the shuttle for the next Hubble Space Telescope servicing mission. One of the upgrade components is a cryogenic cooling system for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). The cooling is required for low noise in the receiver's sensitive electronic instrumentation. Originally, a passive system using dry ice cooled NICMOS, but the ice leaked away and must be replaced. The active cryogenic cooler can provide the cold temperatures required for the NICMOS, but there was a concern that it would create vibrations that would affect the fine pointing accuracy of the Hubble platform.

  2. 78 FR 14160 - Airworthiness Directives; Diamond Aircraft Industries GmbH Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... aviation product. The MCAI describes the unsafe condition as installation of an unsuitable self-locking nut... fuselage, as a result of installation of a non-suitable self-locking nut. The subsequent design review of... configuration has a failure potential when components such as thin self-securing nuts and bearings are aging and...

  3. Zirconium Recycle Test Equipment for Hot Cell Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.

    2015-01-30

    The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.

  4. Assembly and installation of the Belle II TOP detector

    NASA Astrophysics Data System (ADS)

    Suzuki, Kazuhito; Belle II TOP Group

    2017-12-01

    The Time-of-Propagation (TOP) detector is a new type of ring-imaging Cherenkov detector developed for particle identification in the barrel region of the Belle II spectrometer. In the assembly and installation, it is crucial for the detector performance to achieve precision alignment and secure gluing of the optical components as well as to mechanically support them managing the stress, attitude, optical and electrical contacts, and limited installation space. Various efforts were made to develop the procedures and jigs along with the development of the mechanical structure. Such efforts accomplished the assembly and installation in April and May 2016, respectively, without a significant incident.

  5. Extended Sleeve Products Allow Control and Monitoring of Process Fluid Flows Inside Shielding, Behind Walls and Beneath Floors - 13041

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abbott, Mark W.

    2013-07-01

    Throughout power generation, delivery and waste remediation, the ability to control process streams in difficult or impossible locations becomes increasingly necessary as the complexity of processes increases. Example applications include radioactive environments, inside concrete installations, buried in dirt, or inside a shielded or insulated pipe. In these situations, it is necessary to implement innovative solutions to tackle such issues as valve maintenance, valve control from remote locations, equipment cleaning in hazardous environments, and flow stream analysis. The Extended Sleeve family of products provides a scalable solution to tackle some of the most challenging applications in hazardous environments which require flowmore » stream control and monitoring. The Extended Sleeve family of products is defined in three groups: Extended Sleeve (ESV), Extended Bonnet (EBV) and Instrument Enclosure (IE). Each of the products provides a variation on the same requirements: to provide access to the internals of a valve, or to monitor the fluid passing through the pipeline through shielding around the process pipe. The shielding can be as simple as a grout filled pipe covering a process pipe or as complex as a concrete deck protecting a room in which the valves and pipes pass through at varying elevations. Extended Sleeves are available between roughly 30 inches and 18 feet of distance between the pipeline centerline and the top of the surface to which it mounts. The Extended Sleeve provides features such as ± 1.5 inches of adjustment between the pipeline and deck location, internal flush capabilities, automatic alignment of the internal components during assembly and integrated actuator mounting pads. The Extended Bonnet is a shorter fixed height version of the Extended Sleeve which has a removable deck flange to facilitate installation through walls, and is delivered fully assembled. The Instrument Enclosure utilizes many of the same components as an Extended Sleeve, yet allows the installation of process monitoring instruments, such as a turbidity meter to be placed in the flow stream. The basis of the design is a valve body, which, rather than having a directly mounted bonnet has lengths of concentric pipe added, which move the bonnet away from the valve body. The pipe is conceptually similar to an oil field well, with the various strings of casing, and tubing installed. Each concentric pipe provides a required function, such as the outermost pipes, the valve sleeve and penetration sleeve, which provide structural support to the deck flange. For plug valve based designs, the next inner pipe provides compression on the environmental seals at the top of the body to bonnet joint, followed by the innermost pipe which provides rotation of the plug, in the same manner as an extended stem. Ball valve ESVs have an additional pipe to provide compressive loading on the stem packing. Due to the availability of standard pipe grades and weights, the product can be configured to fit a wide array of valve sizes, and application lengths, with current designs as short as seven inches and as tall as 18 feet. Central to the design is the requirement for no special tools or downhole tools to remove parts or configure the product. Off the shelf wrenches, sockets or other hand tools are all that is required. Compared to other products historically available, this design offers a lightweight option, which, while not as rigidly stiff, can deflect compliantly under extreme seismic loading, rather than break. Application conditions vary widely, as the base product is 316 and 304 stainless steel, but utilizes 17-4PH, and other allows as needed based on the temperature range and mechanical requirements. Existing designs are installed in applications as hot as 1400 deg. F, at low pressure, and separately in highly radioactive environments. The selection of plug versus ball valve, metal versus soft seats, and the material of the seals and seats is all dependent on the application requirements. The design of the Extended Sleeve family of products provides a platform which solves a variety of accessibility problems associated with controlling process flow streams in remote, hard to reach locations in harsh environments. Installation of the equipment described has shown to allow access to flow streams that otherwise would require exceptional means to access and control. The Extended Sleeve family of products provides a scalable solution to both control and monitor process fluid flow through shielding, walls or floors when direct connection is advantageous. (authors)« less

  6. Handbook of experiences in the design and installation of solar heating and cooling systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  7. Design of the ITER Electron Cyclotron Heating and Current Drive Waveguide Transmission Line

    NASA Astrophysics Data System (ADS)

    Bigelow, T. S.; Rasmussen, D. A.; Shapiro, M. A.; Sirigiri, J. R.; Temkin, R. J.; Grunloh, H.; Koliner, J.

    2007-11-01

    The ITER ECH transmission line system is designed to deliver the power, from twenty-four 1 MW 170 GHz gyrotrons and three 1 MW 127.5 GHz gyrotrons, to the equatorial and upper launchers. The performance requirements, initial design of components and layout between the gyrotrons and the launchers is underway. Similar 63.5 mm ID corrugated waveguide systems have been built and installed on several fusion experiments; however, none have operated at the high frequency and long-pulse required for ITER. Prototype components are being tested at low power to estimate ohmic and mode conversion losses. In order to develop and qualify the ITER components prior to procurement of the full set of 24 transmission lines, a 170 GHz high power test of a complete prototype transmission line is planned. Testing of the transmission line at 1-2 MW can be performed with a modest power (˜0.5 MW) tube with a low loss (10-20%) resonant ring configuration. A 140 GHz long pulse, 400 kW gyrotron will be used in the initial tests and a 170 GHz gyrotron will be used when it becomes available. Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U.S. Dept. of Energy under contract DE-AC05-00OR22725.

  8. Pybus -- A Python Software Bus

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lavrijsen, Wim T.L.P.

    2004-10-14

    A software bus, just like its hardware equivalent, allows for the discovery, installation, configuration, loading, unloading, and run-time replacement of software components, as well as channeling of inter-component communication. Python, a popular open-source programming language, encourages a modular design on software written in it, but it offers little or no component functionality. However, the language and its interpreter provide sufficient hooks to implement a thin, integral layer of component support. This functionality can be presented to the developer in the form of a module, making it very easy to use. This paper describes a Pythonmodule, PyBus, with which the conceptmore » of a ''software bus'' can be realized in Python. It demonstrates, within the context of the ATLAS software framework Athena, how PyBus can be used for the installation and (run-time) configuration of software, not necessarily Python modules, from a Python application in a way that is transparent to the end-user.« less

  9. 24 CFR 3286.511 - Inspector qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered... a manufactured home that is subject to the requirements of the HUD-administered installation program: (1) A manufactured home or residential building inspector employed by the local authority having...

  10. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  11. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  12. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  13. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  14. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  15. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  16. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...

  17. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...

  18. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...

  19. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  20. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  1. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  2. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...

  4. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...

  5. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  6. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  7. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  8. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  9. 10 CFR 34.33 - Permanent radiographic installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...

  10. 32 CFR 60.6 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... COMMAND ASSISTANCE TEAM (FACAT) § 60.6 Procedures. (a) Reporting requirements. Any person with a... the number of potential victims and determine whether an installation response team may be appropriate...) Notify the installation commander of the allegation and recommend whether an installation response team...

  11. 75 FR 54921 - Withdrawal of Regulatory Guides 1.38, 1.94, and 1.116

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ....116, ``Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical....116, ``Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems,'' dated May 1977. Regulatory Guide 1.38 endorses the American Society of Mechanical...

  12. 42 CFR 84.173 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE... construction; minimum requirements. (a) Each respirator shall, where necessary, be equipped with a suitable...

  13. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  14. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA)more » of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.« less

  15. New Report Shines Light on Installed Costs and Deployment Barriers for

    Science.gov Websites

    Laboratory (NREL) are making available the most detailed component and system-level cost breakdowns to date previously unknown soft costs for the first time. The report, titled "Installed Cost Benchmarks and interest in pairing distributed PV with storage, but there's a lack of publicly available cost data and

  16. 78 FR 19183 - Notice of Funding Availability for the Rural Energy for America Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... project contains a wind and solar photovoltaic components. The wind system will cost $30,000 (75 percent... facilities. For example, a rural small business owner owns five retail stores and wishes to install solar... solar panels on the five stores. However, if this same owner wishes to install solar panels on three of...

  17. Freeform diamond machining of complex monolithic metal optics for integral field systems

    NASA Astrophysics Data System (ADS)

    Dubbeldam, Cornelis M.; Robertson, David J.; Preuss, Werner

    2004-09-01

    Implementation of the optical designs of image slicing Integral Field Systems requires accurate alignment of a large number of small (and therefore difficult to manipulate) optical components. In order to facilitate the integration of these complex systems, the Astronomical Instrumentation Group (AIG) of the University of Durham, in collaboration with the Labor für Mikrozerspanung (Laboratory for Precision Machining - LFM) of the University of Bremen, have developed a technique for fabricating monolithic multi-faceted mirror arrays using freeform diamond machining. Using this technique, the inherent accuracy of the diamond machining equipment is exploited to achieve the required relative alignment accuracy of the facets, as well as an excellent optical surface quality for each individual facet. Monolithic arrays manufactured using this freeform diamond machining technique were successfully applied in the Integral Field Unit for the GEMINI Near-InfraRed Spectrograph (GNIRS IFU), which was recently installed at GEMINI South. Details of their fabrication process and optical performance are presented in this paper. In addition, the direction of current development work, conducted under the auspices of the Durham Instrumentation R&D Program supported by the UK Particle Physics and Astronomy Research Council (PPARC), will be discussed. The main emphasis of this research is to improve further the optical performance of diamond machined components, as well as to streamline the production and quality control processes with a view to making this technique suitable for multi-IFU instruments such as KMOS etc., which require series production of large quantities of optical components.

  18. The Fiber Optic Subsystem Components on Express Logistics Carrier for International Space Station

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Switzer, Robert; Thomes, William Joe; Chuska, Richard; LaRocca, Frank; Day, Lance

    2009-01-01

    ISS SSP 50184 HRDL optical fiber communication subsystem, has system level requirements that were changed to accommodate large loss optical fiber links previously installed. SSQ22680 design is difficult to implement, no metal shell over socket/pin combination to protect the weak part of the pin. Additions to ISS are planned for the future. AVIM still used for interconnection in space flight applications without incident. Thermal cycling resulted in less than 0.25 dB max change in Insertion Loss for all types during cycling, nominal as compared to the AVIM. Vibration testing results conclusion; no significant changes, nominal as compared to AVIM.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noreen, D; LeChevalier, R; Choi, M

    President Carter established a goal that would require installation of at least one million solar water heaters by 1985 and 20 million water-heating systems by the year 2000. The goals established require that the solar industry be sufficiently mature to provide cost-effective, reliable designs in the immediate future. The objective of this study was to provide the Department of Energy with quantified data that can be used to assess and redirect, if necessary, the program plans to assure compliance with the President's goals. Results deal with the product, the industry, the market, and the consumer. All issues are examined inmore » the framework of the conventional-hot-water industry. Based on the results of this solar hot water assessment study, there is documented proof that the solar industry is blessed with over 20 good solar hot water systems. A total of eight generic types are currently being produced, but a majority of the systems being sold are included in only five generic types. The good systems are well-packaged for quality, performance and installation ease. These leading systems are sized and designed to fit the requirements of the consumer in every respect. This delivery end also suffers from a lack of understanding of the best methods for selling the product. At the supplier end, there are problems also, including: some design deficiencies, improper materials selection and, occasionally, the improper selection of components and subsystems. These, in total, are not serious problems in the better systems and will be resolved as this industry matures.« less

  20. Vessel thermal map real-time system for the JET tokamak

    NASA Astrophysics Data System (ADS)

    Alves, D.; Felton, R.; Jachmich, S.; Lomas, P.; McCullen, P.; Neto, A.; Valcárcel, D. F.; Arnoux, G.; Card, P.; Devaux, S.; Goodyear, A.; Kinna, D.; Stephen, A.; Zastrow, K.-D.

    2012-05-01

    The installation of international thermonuclear experimental reactor-relevant materials for the plasma facing components (PFCs) in the Joint European Torus (JET) is expected to have a strong impact on the operation and protection of the experiment. In particular, the use of all-beryllium tiles, which deteriorate at a substantially lower temperature than the formerly installed carbon fiber composite tiles, imposes strict thermal restrictions on the PFCs during operation. Prompt and precise responses are therefore required whenever anomalous temperatures are detected. The new vessel thermal map real-time application collects the temperature measurements provided by dedicated pyrometers and infrared cameras, groups them according to spatial location and probable offending heat source, and raises alarms that will trigger appropriate protective responses. In the context of the JET global scheme for the protection of the new wall, the system is required to run on a 10 ms cycle communicating with other systems through the real-time data network. In order to meet these requirements a commercial off-the-shelf solution has been adopted based on standard x86 multicore technology. Linux and the multithreaded application real-time executor (MARTe) software framework were respectively the operating system of choice and the real-time framework used to build the application. This paper presents an overview of the system with particular technical focus on the configuration of its real-time capability and the benefits of the modular development approach and advanced tools provided by the MARTe framework.

  1. A virtual reality system for arm and hand rehabilitation

    NASA Astrophysics Data System (ADS)

    Luo, Zhiqiang; Lim, Chee Kian; Chen, I.-Ming; Yeo, Song Huat

    2011-03-01

    This paper presents a virtual reality (VR) system for upper limb rehabilitation. The system incorporates two motion track components, the Arm Suit and the Smart Glove which are composed of a range of the optical linear encoders (OLE) and the inertial measurement units (IMU), and two interactive practice applications designed for driving users to perform the required functional and non-functional motor recovery tasks. We describe the technique details about the two motion track components and the rational to design two practice applications. The experiment results show that, compared with the marker-based tracking system, the Arm Suit can accurately track the elbow and wrist positions. The repeatability of the Smart Glove on measuring the five fingers' movement can be satisfied. Given the low cost, high accuracy and easy installation, the system thus promises to be a valuable complement to conventional therapeutic programs offered in rehabilitation clinics and at home.

  2. Foam Core Shielding for Spacecraft

    NASA Technical Reports Server (NTRS)

    Adams, Marc

    2007-01-01

    A foam core shield (FCS) system is now being developed to supplant multilayer insulation (MLI) systems heretofore installed on spacecraft for thermal management and protection against meteoroid impacts. A typical FCS system consists of a core sandwiched between a face sheet and a back sheet. The core can consist of any of a variety of low-to-medium-density polymeric or inorganic foams chosen to satisfy application-specific requirements regarding heat transfer and temperature. The face sheet serves to shock and thereby shatter incident meteoroids, and is coated on its outer surface to optimize its absorptance and emittance for regulation of temperature. The back sheet can be dimpled to minimize undesired thermal contact with the underlying spacecraft component and can be metallized on the surface facing the component to optimize its absorptance and emittance. The FCS systems can perform better than do MLI systems, at lower mass and lower cost and with greater volumetric efficiency.

  3. Design, Project Execution, and Commissioning of the 1.8 K Superfluid Helium Refrigeration System for SRF Cryomodule Testing

    DOE PAGES

    Treite, P.; Nuesslein, U.; Jia, Yi; ...

    2015-07-15

    The Fermilab Cryomodule Test Facility (CMTF) provides a test bed to measure the performance of superconducting radiofrequency (SRF) cryomodules (CM). These SRF components form the basic building blocks of future high intensity accelerators such as the International Linear Collider (ILC) and a Muon Collider. Linde Kryotechnik AG and Linde Cryogenics have designed, constructed and commissioned the superfluid helium refrigerator needed to support SRF component testing at the CMTF Facility. The hybrid refrigerator is designed to operate in a variety of modes and under a wide range of boundary conditions down to 1.8 Kelvin set by CM design. Special features ofmore » the refrigerator include the use of warm and cold compression and high efficiency turbo expanders.This paper gives an overview on the wide range of the challenging cooling requirements, the design, fabrication and the commissioning of the installed cryogenic system.« less

  4. CymeR: cytometry analysis using KNIME, docker and R

    PubMed Central

    Muchmore, B.; Alarcón-Riquelme, M.E.

    2017-01-01

    Abstract Summary: Here we present open-source software for the analysis of high-dimensional cytometry data using state of the art algorithms. Importantly, use of the software requires no programming ability, and output files can either be interrogated directly in CymeR or they can be used downstream with any other cytometric data analysis platform. Also, because we use Docker to integrate the multitude of components that form the basis of CymeR, we have additionally developed a proof-of-concept of how future open-source bioinformatic programs with graphical user interfaces could be developed. Availability and Implementation: CymeR is open-source software that ties several components into a single program that is perhaps best thought of as a self-contained data analysis operating system. Please see https://github.com/bmuchmore/CymeR/wiki for detailed installation instructions. Contact: brian.muchmore@genyo.es or marta.alarcon@genyo.es PMID:27998935

  5. CymeR: cytometry analysis using KNIME, docker and R.

    PubMed

    Muchmore, B; Alarcón-Riquelme, M E

    2017-03-01

    Here we present open-source software for the analysis of high-dimensional cytometry data using state of the art algorithms. Importantly, use of the software requires no programming ability, and output files can either be interrogated directly in CymeR or they can be used downstream with any other cytometric data analysis platform. Also, because we use Docker to integrate the multitude of components that form the basis of CymeR, we have additionally developed a proof-of-concept of how future open-source bioinformatic programs with graphical user interfaces could be developed. CymeR is open-source software that ties several components into a single program that is perhaps best thought of as a self-contained data analysis operating system. Please see https://github.com/bmuchmore/CymeR/wiki for detailed installation instructions. brian.muchmore@genyo.es or marta.alarcon@genyo.es. © The Author 2016. Published by Oxford University Press.

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  7. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  8. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  9. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  10. 42 CFR 84.196 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Chemical Cartridge Respirators § 84.196 Harnesses; installation and construction; minimum...

  11. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  12. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  13. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  14. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  15. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  16. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  17. 46 CFR 108.495 - Spare charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., offices, lockers, small storerooms, and pantries, open decks, and similar spaces None required. service... extinguishing system is installed. 2. Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart. Table 108.495(b) Classification: Type and size Water liters (gallons) Foam...

  18. 46 CFR 108.495 - Spare charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., offices, lockers, small storerooms, and pantries, open decks, and similar spaces None required. service... extinguishing system is installed. 2. Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart. Table 108.495(b) Classification: Type and size Water liters (gallons) Foam...

  19. 46 CFR 108.495 - Spare charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., offices, lockers, small storerooms, and pantries, open decks, and similar spaces None required. service... extinguishing system is installed. 2. Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart. Table 108.495(b) Classification: Type and size Water liters (gallons) Foam...

  20. 46 CFR 108.495 - Spare charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., offices, lockers, small storerooms, and pantries, open decks, and similar spaces None required. service... extinguishing system is installed. 2. Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart. Table 108.495(b) Classification: Type and size Water liters (gallons) Foam...

  1. 46 CFR 108.495 - Spare charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., offices, lockers, small storerooms, and pantries, open decks, and similar spaces None required. service... extinguishing system is installed. 2. Not required where a fixed foam system is installed in accordance with § 108.489 of this subpart. Table 108.495(b) Classification: Type and size Water liters (gallons) Foam...

  2. 40 CFR 1033.335 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Remanufactured locomotives: installation audit requirements. 1033.335 Section 1033.335 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM LOCOMOTIVES Manufacturer and Remanufacturer Production Line Testing and Audit...

  3. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  4. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  5. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  6. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  7. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  8. Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ardani, Kristen; O'Shaughnessy, Eric; Fu, Ran

    2016-12-01

    In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quartermore » of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.« less

  9. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  10. Equipment and Tracking Test Results for the NRL Ship-to- Ship DF Laser Transmission Experiment.

    DTIC Science & Technology

    1982-04-05

    combined with the 2" collimated HeNe laser beam at dichoric beam splitter TBSI. TF2, TF1 , and TPFI direct the beam onto the f/6 parabola Pl. From...following work was done on the pumping system: 1. Install new valves , springs, and seats. 2. Install a new drive shaft, with new bearings and seals. 3...Install a new needle valve in the oil regulator. 4. Steam clean the inside pump surface. The new components were tested first with F2 fuel, then with NF 3

  11. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  12. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  13. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  14. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  15. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  16. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  17. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  18. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...

  19. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  20. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...

  1. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  2. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  3. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  4. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  5. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  6. 24 CFR 232.620 - Determination of compliance by HHS.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of Fire Safety Equipment Special Requirements § 232.620 Determination of compliance by HHS. An... the fire safety equipment has been installed, will be in compliance with the HHS requirements for fire... Security Act upon the installation of the fire safety equipment. The architectural exhibits, as approved...

  7. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...

  8. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...

  9. 24 CFR 3286.207 - Process for obtaining installation license.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... installation license must submit verification of the experience required in § 3286.205(a). This verification may be in the form of statements by past or present employers or a self-certification that the applicant meets those experience requirements, but HUD may contact the applicant for additional verification...

  10. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except outboard motors, shall be equipped with an acceptable means of backfire flame control. (b) Installations... Approval Nos. 162.015 or 162.041 or engine air and fuel induction systems bearing basic Approval Nos. 162...

  11. 46 CFR 25.35-1 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Requirements. (a) Every gasoline engine installed in a motorboat or motor vessel after April 25, 1940, except outboard motors, shall be equipped with an acceptable means of backfire flame control. (b) Installations... Approval Nos. 162.015 or 162.041 or engine air and fuel induction systems bearing basic Approval Nos. 162...

  12. 77 FR 47273 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... the autopilot electrical wiring conduit and the wing bottom skin. This AD requires modifying the wiring installation on the right-hand wing. We are issuing this AD to prevent sparking due to electrical... above, this [EASA] AD requires modification of the wiring installation to improve the routing and the...

  13. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  14. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  15. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  16. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  17. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  18. 26 CFR 1.6655-5 - Short taxable year.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 3. Initial short year with three required installments. Corporation C began business on February 12... business on February 12, 2009, and adopted a calendar year as its taxable year. X adopts an accrual method... short year with four required installments. Corporation B began business on January 9, 2009, and adopted...

  19. Slave finite element for non-linear analysis of engine structures. Volume 2: Programmer's manual and user's manual

    NASA Technical Reports Server (NTRS)

    Witkop, D. L.; Dale, B. J.; Gellin, S.

    1991-01-01

    The programming aspects of SFENES are described in the User's Manual. The information presented is provided for the installation programmer. It is sufficient to fully describe the general program logic and required peripheral storage. All element generated data is stored externally to reduce required memory allocation. A separate section is devoted to the description of these files thereby permitting the optimization of Input/Output (I/O) time through efficient buffer descriptions. Individual subroutine descriptions are presented along with the complete Fortran source listings. A short description of the major control, computation, and I/O phases is included to aid in obtaining an overall familiarity with the program's components. Finally, a discussion of the suggested overlay structure which allows the program to execute with a reasonable amount of memory allocation is presented.

  20. Impact of Hospital Information Systems on Emergency Patient Processing

    PubMed Central

    Rusnak, James E.

    1981-01-01

    The Emergency Department offers the Hospital Information System's designer some unique problems to solve in the operational areas of patient registration, order entry, charge recording, and treatment processing. In a number of instances, Hospital Information Systems implementers have encountered serious difficulties in trying to design system components to support the requirements of the Emergency Services Department's operations. Washington Hospital has developed a very effective system for Emergency Services. The system's features are designed to meet the special requirements of the department and to maximize the use of the data captured by the Hospital Information System. The system supports accurate and timely charging for services. The treatment of the patient has been dramatically improved through the use of a computerized order processing and control. The installed systems resulted in a higher quality of care and cost effective operations.

Top