Science.gov

Sample records for configuration management implementation

  1. Tank waste remediation system configuration management implementation plan

    SciTech Connect

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  2. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    SciTech Connect

    Burgard, K.G.

    1998-09-24

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

  3. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect

    GARRISON, R.C.

    2000-09-22

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management.

  4. Operational concepts and implementation strategies for the design configuration management process.

    SciTech Connect

    Trauth, Sharon Lee

    2007-05-01

    This report describes operational concepts and implementation strategies for the Design Configuration Management Process (DCMP). It presents a process-based systems engineering model for the successful configuration management of the products generated during the operation of the design organization as a business entity. The DCMP model focuses on Pro/E and associated activities and information. It can serve as the framework for interconnecting all essential aspects of the product design business. A design operation scenario offers a sense of how to do business at a time when DCMP is second nature within the design organization.

  5. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect

    GARRISON, R.C.

    2000-11-28

    This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

  6. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  7. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  8. Software Configuration Management Guidebook

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The growth in cost and importance of software to NASA has caused NASA to address the improvement of software development across the agency. One of the products of this program is a series of guidebooks that define a NASA concept of the assurance processes which are used in software development. The Software Assurance Guidebook, SMAP-GB-A201, issued in September, 1989, provides an overall picture of the concepts and practices of NASA in software assurance. Lower level guidebooks focus on specific activities that fall within the software assurance discipline, and provide more detailed information for the manager and/or practitioner. This is the Software Configuration Management Guidebook which describes software configuration management in a way that is compatible with practices in industry and at NASA Centers. Software configuration management is a key software development process, and is essential for doing software assurance.

  9. CMS - HLT Configuration Management System

    NASA Astrophysics Data System (ADS)

    Daponte, Vincenzo; Bocci, Andrea

    2015-12-01

    The CMS High Level Trigger (HLT) is a collection of software algorithms that run using an optimized version of the CMS offline reconstruction software. The HLT uses Python configuration files each containing hundreds of "modules", organized in "sequences" and "paths". Each configuration usually uses an average of 2200 different modules and more than 400 independent trigger paths. The complexity of the HLT configurations and their large number require the design of a suitable data management system. The work presented here describes the solution designed to manage the considerable number of configurations developed and to assist the editing of new configurations.

  10. National Ignition Facility Configuration Management Plan

    SciTech Connect

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  11. NASA's acquisition requirements for configuration management

    NASA Technical Reports Server (NTRS)

    Coletta, Mark P.

    1992-01-01

    A viewgraph presentation on NASA's acquisition requirements for configuration management (CM) goes over CM requirements for single mission and multi-mission orientations, CM automation and CALS implementation initiatives, NASA implementation of DOD standards and DID's (data item descriptions), impact of traceability in NASA CM support, NASA's CM efforts in modifying/upgrading equipment, and CM control of multi-vendor hardware.

  12. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  13. Device configuration-management system

    SciTech Connect

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information.

  14. Configuration Management at NASA

    NASA Technical Reports Server (NTRS)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  15. Sandia software guidelines, Volume 4: Configuration management

    SciTech Connect

    Not Available

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  16. NCCDS configuration management process improvement

    NASA Technical Reports Server (NTRS)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  17. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  18. The configuration management program for the Emergency Management Support System

    SciTech Connect

    Probasco, K M; Stephan, E G

    1991-08-01

    Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

  19. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  20. Integrating configuration workflows with project management system

    NASA Astrophysics Data System (ADS)

    Nilsen, Dimitri; Weber, Pavel

    2014-06-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  1. Configuration management for hardware-software codesign

    SciTech Connect

    Kobialka, H.U.; Gnedina, A.; Wilberg, J.

    1996-12-31

    Configuration Management (CM) has a long tradition in the area of software development. In other areas CM is still more a promise than a product to be used. During HW/SW codesign a large design space has to be explored in order to find the optimal combination of software and hardware. This is an optimization process where many variants (> 1000) and associated analysis results have to be maintained for later exploration. Each variant consists of hundreds of files. This paper describes the CM requirements we encountered when introducing CM in a HW/SW codesign project. CM support for HW/SW codesign has been implemented in the ADDD development environment.

  2. autokonf - A Configuration Script Generator Implemented in Perl

    SciTech Connect

    Reus, J F

    2005-01-12

    This paper discusses configuration scripts in general and the scripting language issues involved. A brief description of GNU autoconf is provided along with a contrasting overview of autokonf, a configuration script generator implemented in Perl, whose macros are implemented in Perl, generating a configuration script in Perl. It is very portable, easily extensible, and readily mastered.

  3. Context based configuration management system

    NASA Technical Reports Server (NTRS)

    Gawdiak, Yuri O. (Inventor); Gurram, Mohana M. (Inventor); Maluf, David A. (Inventor); Mederos, Luis A. (Inventor)

    2010-01-01

    A computer-based system for configuring and displaying information on changes in, and present status of, a collection of events associated with a project. Classes of icons for decision events, configurations and feedback mechanisms, and time lines (sequential and/or simultaneous) for related events are displayed. Metadata for each icon in each class is displayed by choosing and activating the corresponding icon. Access control (viewing, reading, writing, editing, deleting, etc.) is optionally imposed for metadata and other displayed information.

  4. Configuration Data Management (CDM) on a Shoestring Identifying & Utilizing an Existing Configuration & Data Management Infrastructure

    SciTech Connect

    VANN, J.M.

    2000-08-24

    The spreading need for and use of configuration and data management (CDM) standards has highlighted a number of challenges to the companies that need to implement those standards. For companies and organizations that are new to CDM or have limited CDM capabilities, one of the major dilemmas faced is identifying how and where to start. In many cases there is a need to contend with a legacy of poorly identified items and information and an immature or non-existent CDM infrastructure (processes, procedures, people, and information systems). To the company management and CDM professional this poses a seemingly insurmountable task of putting in place a CDM infrastructure that provides the needed benefits while keeping within an acceptable cost and schedule. This paper deals with initially establishing the CDM infrastructure using the tools that a company already has available. The paper identifies features of common software applications that can be used to implement CDM principles.

  5. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    NASA Technical Reports Server (NTRS)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  6. Software control and system configuration management - A process that works

    NASA Technical Reports Server (NTRS)

    Petersen, K. L.; Flores, C., Jr.

    1983-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  7. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  8. Configuration and Data Management Process and the System Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  9. Configuration management; Operating power station electrical systems

    SciTech Connect

    Beavers, R.R.; Sumiec, K.F. )

    1989-01-01

    Increasing regulatory and industry attention has been focused on properly controlling electrical design changes. These changes can be controlled by using configuration management techniques. Typically, there are ongoing modifications to various process systems or additions due to new requirements at every power plant. Proper control of these changes requires that an organized method be used to ensure that all important parameters of the electrical auxiliary systems are analyzed and that these parameters are evaluated accurately. This process, commonly referred to as configuration management, is becoming more important on both fossil and nuclear plants. Recent NRC- and utility-initiated inspections have identified problems due to incomplete analysis of changes to electrical auxiliary systems at nuclear stations.

  10. Configuration management plan for the GENII software

    SciTech Connect

    Rittmann, P.D.

    1994-12-12

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user`s input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user`s input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user`s guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan.

  11. HotSpot Software Configuration Management Plan

    SciTech Connect

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  12. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  13. Mac configuration management at the Los Alamos National Laboratory

    SciTech Connect

    Marcus, Allan B

    2010-01-01

    The Los Alamos National Laboratory (LANL) had a need for central configuration management of non-Windows computers. LANL has three to five thousand Macs and an equal number of Linux based systems. The primary goal was to be able to inventory all non-windows systems and patch Mc OS X systems. LANL examined a number of commercial and open source solutions and ultimately selected Puppet. This paper will discuss why we chose Puppet, how we implemented it, and some lessons we learned along the way.

  14. Configuration Data Management (CDM) on a Shoestring Identifying and Utilizing an Existing Configuration and Data Management Infrastructure

    SciTech Connect

    VANN, J.M.

    2000-09-25

    The spreading need for and use of configuration and data management (CDM) standards has highlighted a number of challenges to the companies that need to implement those standards. For companies and organizations that are new to CDM or have limited CDM capabilities, one of the major dilemmas faced is identifying how and where to start. In many cases there is a need to contend with a legacy of poorly identified items and information and an immature or non-existent CDM infrastructure (processes, procedures, people, and information systems). To the company management and CDM professional this poses a seemingly insurmountable task of putting in place a CDM infrastructure that provides the needed benefits while keeping within an acceptable cost and schedule. This paper deals with initially establishing the CDM infrastructure using the tools that a company already has available. The paper identifies features of common software applications that can be used to implement CDM principles.

  15. Throughput Benefit Assessment for Tactical Runway Configuration Management (TRCM)

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Fenbert, James W.

    2014-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of needed capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, monitoring the active runway configuration for suitability given existing factors, based on a 90 minute planning horizon. This study evaluates the throughput benefits using a representative sample of today's traffic volumes at three airports: Memphis International Airport (MEM), Dallas-Fort Worth International Airport (DFW), and John F. Kennedy International Airport (JFK). Based on this initial assessment, there are statistical throughput benefits for both arrivals and departures at MEM with an average of 4% for arrivals, and 6% for departures. For DFW, there is a statistical benefit for arrivals with an average of 3%. Although there is an average of 1% benefit observed for departures, it is not statistically significant. For JFK, there is a 12% benefit for arrivals, but a 2% penalty for departures. The results obtained are for current traffic volumes and should show greater benefit for increased future demand. This paper also proposes some potential TRCM algorithm improvements for future research. A continued research plan is being worked to implement these improvements and to re-assess the throughput benefit for today and future projected traffic volumes.

  16. SW Configuration Management Practises for an Incremental Space SW Development Process

    NASA Astrophysics Data System (ADS)

    Tipaldi, Massimo; Reger, Florian; Bruggmann, Jorg; Dehnhardt, Erik; Bruenjes, Bernhard

    2014-08-01

    This paper describes software configuration management practices featuring an incremental software development approach, referred to as "robust software feedback model". A proper SW configuration process is fundamental for the correct implementation of whatever SW development approach and can guarantee its effectiveness. Special attention is given to the SW versioning rules, the SW repository structure and related usage from both the development and testing standpoint.

  17. The Configuration Management Role in Collaborative Software Engineering

    NASA Astrophysics Data System (ADS)

    Murta, Leonardo Gresta P.; Werner, Claudia Maria L.; Estublier, Jacky

    This chapter discusses the impact of configuration management on collaborative software engineering, analyzing both the state-of-the-practice and the state-of-the-art. It starts with a brief introduction of the configuration management field and presents how this field has been supporting collaborative software engineering. It also analyzes the current researches on configuration management that will potentially help on establishing a better support to collaborative software engineering in the future. Finally, it presents a summary that details how each configuration management function and system relates to each collaboration aspect of software engineering.

  18. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    SciTech Connect

    T.L. Larrieu; Y.R. Roblin; K. White; R. Slominski

    2005-10-10

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey & Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a centralized framework.

  19. Configuration Management of an Optimization Application in a Research Environment

    NASA Technical Reports Server (NTRS)

    Townsend, James C.; Salas, Andrea O.; Schuler, M. Patricia

    1999-01-01

    Multidisciplinary design optimization (MDO) research aims to increase interdisciplinary communication and reduce design cycle time by combining system analyses (simulations) with design space search and decision making. The High Performance Computing and Communication Program's current High Speed Civil Transport application, HSCT4.0, at NASA Langley Research Center involves a highly complex analysis process with high-fidelity analyses that are more realistic than previous efforts at the Center. The multidisciplinary processes have been integrated to form a distributed application by using the Java language and Common Object Request Broker Architecture (CORBA) software techniques. HSCT4.0 is a research project in which both the application problem and the implementation strategy have evolved as the MDO and integration issues became better understood. Whereas earlier versions of the application and integrated system were developed with a simple, manual software configuration management (SCM) process, it was evident that this larger project required a more formal SCM procedure. This report briefly describes the HSCT4.0 analysis and its CORBA implementation and then discusses some SCM concepts and their application to this project. In anticipation that SCM will prove beneficial for other large research projects, the report concludes with some lessons learned in overcoming SCM implementation problems for HSCT4.0.

  20. Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1996-01-01

    The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.

  1. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  2. Data base management system configuration specification. [computer storage devices

    NASA Technical Reports Server (NTRS)

    Neiers, J. W.

    1979-01-01

    The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

  3. Implementation of Knowledge Management in Organizations

    ERIC Educational Resources Information Center

    Winkler, Katrin; Mandl, Heinz

    2007-01-01

    In the context of learning implementation of new ideas e.g. knowledge management in organizations often is neglected. Concerning knowledge management measures we demonstrate its implementation in organizations. A theoretical framework was developed showing the necessary basic conditions for implementing knowledge management. Subsequently we…

  4. Earth Observing System (EOS)/Advanced Microwave Sounding Unit A (AMSU-A) configuration management plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1994-01-01

    This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.

  5. Virtual Network Configuration Management System for Data Center Operations and Management

    NASA Astrophysics Data System (ADS)

    Okita, Hideki; Yoshizawa, Masahiro; Uehara, Keitaro; Mizuno, Kazuhiko; Tarui, Toshiaki; Naono, Ken

    Virtualization technologies are widely deployed in data centers to improve system utilization. However, they increase the workload for operators, who have to manage the structure of virtual networks in data centers. A virtual-network management system which automates the integration of the configurations of the virtual networks is provided. The proposed system collects the configurations from server virtualization platforms and VLAN-supported switches, and integrates these configurations according to a newly developed XML-based management information model for virtual-network configurations. Preliminary evaluations show that the proposed system helps operators by reducing the time to acquire the configurations from devices and correct the inconsistency of operators' configuration management database by about 40 percent. Further, they also show that the proposed system has excellent scalability; the system takes less than 20 minutes to acquire the virtual-network configurations from a large scale network that includes 300 virtual machines. These results imply that the proposed system is effective for improving the configuration management process for virtual networks in data centers.

  6. Benefits Assessment for Tactical Runway Configuration Management Tool

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamongkolkij, Nipa; Lohr, Gary; Fenbert, James W.

    2013-01-01

    The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

  7. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  8. Configuring the Structure and Administration of Learning Management

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2005-01-01

    Purpose: Experience shows that there are problems arising from the implementation of learning management systems (LMS). Indications are that they are too e-learning technology driven, emphasising the virtual component and neglecting the precursory development of a vibrant and committed formal learning organisation culture and infrastructure. This…

  9. Grading standards, prepared by the Configuration Management Office

    SciTech Connect

    Cort, G.; Donahue, S.; Frank, J.; Perkins, B.; Wrye, J.

    1994-01-28

    This report describes the grading methodology used by the organization to determine the required levels of configuration management for all controlled elements that are part of the nuclear facility and its operation. The goal is to have a flexible grading system that accurately reflects the overall operational environment. The grading methodology should identify which items, processes, and information should be incorporated into facility baselines as controlled elements; and specify the level of formality that should be applied to activities that employ or impact these controlled elements. Evaluation categories include the following: radiological damage to workers; toxicological damage to workers; industrial safety; environmental damage; property damage; facility availability; cost effect; reputation; and commitments.

  10. Disease management: program design, development, and implementation.

    PubMed

    Harvey, N; DePue, D M

    1997-06-01

    Disease management is an emerging approach to patient management, customer satisfaction, and cost containment that comprises disease modeling; patient segmentation and risk assessment; clinical protocols; and wellness, self-management, and education. Implementing a disease management program poses significant challenges to healthcare organizations. To successfully implement a disease management program, a tightly integrated continuum of care, sophisticated information systems, and disease management support systems must be in place. Strategic partnerships with outside vendors may speed program implementation and provide opportunities to develop risk-sharing relationships. PMID:10167840

  11. A new flight control and management system architecture and configuration

    NASA Astrophysics Data System (ADS)

    Kong, Fan-e.; Chen, Zongji

    2006-11-01

    The advanced fighter should possess the performance such as super-sound cruising, stealth, agility, STOVL(Short Take-Off Vertical Landing),powerful communication and information processing. For this purpose, it is not enough only to improve the aerodynamic and propulsion system. More importantly, it is necessary to enhance the control system. A complete flight control system provides not only autopilot, auto-throttle and control augmentation, but also the given mission management. F-22 and JSF possess considerably outstanding flight control system on the basis of pave pillar and pave pace avionics architecture. But their control architecture is not enough integrated. The main purpose of this paper is to build a novel fighter control system architecture. The control system constructed on this architecture should be enough integrated, inexpensive, fault-tolerant, high safe, reliable and effective. And it will take charge of both the flight control and mission management. Starting from this purpose, this paper finishes the work as follows: First, based on the human nervous control, a three-leveled hierarchical control architecture is proposed. At the top of the architecture, decision level is in charge of decision-making works. In the middle, organization & coordination level will schedule resources, monitor the states of the fighter and switch the control modes etc. And the bottom is execution level which holds the concrete drive and measurement; then, according to their function and resources all the tasks involving flight control and mission management are sorted to individual level; at last, in order to validate the three-leveled architecture, a physical configuration is also showed. The configuration is distributed and applies some new advancement in information technology industry such line replaced module and cluster technology.

  12. Implementing a Domain Specific Language to configure and run LHCb Continuous Integration builds

    NASA Astrophysics Data System (ADS)

    Clemencic, M.; Couturier, B.

    2015-12-01

    The new LHCb nightly build system described at CHEP 2013 was limited by the use of JSON files for its configuration. JSON had been chosen as a temporary solution to maintain backward compatibility towards the old XML format by means of a translation function. Modern languages like Python leverage on meta-programming techniques to enable the development of Domain Specific Languages (DSLs). In this contribution we will present the advantages of such techniques and how they have been used to implement a DSL that can be used to both describe the configuration of the LHCb Nightly Builds and actually operate them.

  13. Smart Management in Effective Schools: Effective Management Configurations in General and Vocational Education in the Netherlands

    ERIC Educational Resources Information Center

    Hofman, W. H. Adriaan; Hofman, Roelande H.

    2011-01-01

    Purpose: In this study the authors focus on different (configurations of) leadership or management styles in schools for general and vocational education. Findings: Using multilevel (students and schools) analyses, strong differences in effective management styles between schools with different student populations were observed. Conclusions: The…

  14. Vortical flow management for improved configuration aerodynamics: Recent experiences

    NASA Technical Reports Server (NTRS)

    Rao, D. M.

    1983-01-01

    Recent progress in vortex-control applications for alleviating the adverse consequences of three dimensional separation and vortical interactions on slender body/swept wing configurations is reported. Examples include helical separation trip to alleviate the side force due to forebody vortex asymmetry; hinged strakes to avoid vortex breakdown effects; compartmentation of swept leading edge separation to delay the pitch-up instability; under wing vortex trip and vortex trip and vortex flaps for drag reduction at high lift; and an apex-flap trimmer to fully utilize the lift capability of trailing-edge flaps for take off and landing of delta wings. Experimental results on generic wind-tunnel models are presented to illustrate the vortex-management concepts involved and to indicate their potential for enhancing the subsonic aerodynamics of supersonic-cruise type vehicles.

  15. Ground Systems Development Environment (GSDE) software configuration management

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.

  16. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  17. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  18. Implementing Total Quality Management in Vocational Education.

    ERIC Educational Resources Information Center

    Navaratnam, K. K.; Mountney, Peter

    In an internationally competitive training environment, implementation of Total Quality Management (TQM) in vocational education can provide a comparative advantage in preparing the type of work force required for micro and macro economic reforms. The concept of TQM can be used as a management tool to improve the standards of vocational training.…

  19. An open and configurable embedded system for EMG pattern recognition implementation for artificial arms.

    PubMed

    Jun Liu; Fan Zhang; Huang, He Helen

    2014-01-01

    Pattern recognition (PR) based on electromyographic (EMG) signals has been developed for multifunctional artificial arms for decades. However, assessment of EMG PR control for daily prosthesis use is still limited. One of the major barriers is the lack of a portable and configurable embedded system to implement the EMG PR control. This paper aimed to design an open and configurable embedded system for EMG PR implementation so that researchers can easily modify and optimize the control algorithms upon our designed platform and test the EMG PR control outside of the lab environments. The open platform was built on an open source embedded Linux Operating System running a high-performance Gumstix board. Both the hardware and software system framework were openly designed. The system was highly flexible in terms of number of inputs/outputs and calibration interfaces used. Such flexibility enabled easy integration of our embedded system with different types of commercialized or prototypic artificial arms. Thus far, our system was portable for take-home use. Additionally, compared with previously reported embedded systems for EMG PR implementation, our system demonstrated improved processing efficiency and high system precision. Our long-term goals are (1) to develop a wearable and practical EMG PR-based control for multifunctional artificial arms, and (2) to quantify the benefits of EMG PR-based control over conventional myoelectric prosthesis control in a home setting.

  20. 77 FR 50727 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... COMMISSION Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear... draft regulatory guide (DG), DG-1206, ``Configuration Management Plan for Digital Computer Software Used... Digital Computer Software Used in Safety Systems of Nuclear Power Plants'' is temporarily identified...

  1. 78 FR 47014 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... 22, 2012 (77 FR 50727) for a 60-day public comment period. The public comment period closed on... COMMISSION Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear... 1 of RG 1.169, ``Configuration Management Plans for Digital Computer Software Used in Safety...

  2. Network configuration management : paving the way to network agility.

    SciTech Connect

    Maestas, Joseph H.

    2007-08-01

    Sandia networks consist of nearly nine hundred routers and switches and nearly one million lines of command code, and each line ideally contributes to the capabilities of the network to convey information from one location to another. Sandia's Cyber Infrastructure Development and Deployment organizations recognize that it is therefore essential to standardize network configurations and enforce conformance to industry best business practices and documented internal configuration standards to provide a network that is agile, adaptable, and highly available. This is especially important in times of constrained budgets as members of the workforce are called upon to improve efficiency, effectiveness, and customer focus. Best business practices recommend using the standardized configurations in the enforcement process so that when root cause analysis results in recommended configuration changes, subsequent configuration auditing will improve compliance to the standard. Ultimately, this minimizes mean time to repair, maintains the network security posture, improves network availability, and enables efficient transition to new technologies. Network standardization brings improved network agility, which in turn enables enterprise agility, because the network touches all facets of corporate business. Improved network agility improves the business enterprise as a whole.

  3. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    SciTech Connect

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

  4. Implementing a Microcomputer Database Management System.

    ERIC Educational Resources Information Center

    Manock, John J.; Crater, K. Lynne

    1985-01-01

    Current issues in selecting, structuring, and implementing microcomputer database management systems in research administration offices are discussed, and their capabilities are illustrated with the system used by the University of North Carolina at Wilmington. Trends in microcomputer technology and their likely impact on research administration…

  5. Implementing Plain Language: A Manager's Guide.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto.

    Drawn from the experience of various ministries and departments in governments across Canada, this guide is meant to be a practical guide in implementing plain language for managers in the Ontario (Canada) government. The guide describes how to use plain language in planning, writing, designing, and editing forms and documents, and how to set up…

  6. Now's the Time: Implementing Performance Management

    ERIC Educational Resources Information Center

    Legutko, Lee V.

    2012-01-01

    During the past several years, school systems have implemented a variety of organizational improvement initiatives, such as Six Sigma, Balanced Scorecards, Baldrige Criteria, activity-based costing, and managing for results. Unfortunately, evidence of sustained success is fleeting as school districts remain trapped in a time warp of command,…

  7. Implementation of a Computerized Maintenance Management System

    NASA Technical Reports Server (NTRS)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  8. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  9. Synthesizing Configurable Biochemical Implementation of Linear Systems from Their Transfer Function Specifications

    PubMed Central

    Chiu, Tai-Yin; Chiang, Hui-Ju K.; Huang, Ruei-Yang; Jiang, Jie-Hong R.; Fages, François

    2015-01-01

    The ability to engineer synthetic systems in the biochemical context is constantly being improved and has a profound societal impact. Linear system design is one of the most pervasive methods applied in control tasks, and its biochemical realization has been proposed by Oishi and Klavins and advanced further in recent years. However, several technical issues remain unsolved. Specifically, the design process is not fully automated from specification at the transfer function level, systems once designed often lack dynamic adaptivity to environmental changes, matching rate constants of reactions is not always possible, and implementation may be approximative and greatly deviate from the specifications. Building upon the work of Oishi and Klavins, this paper overcomes these issues by introducing a design flow that transforms a transfer-function specification of a linear system into a set of chemical reactions, whose input-output response precisely conforms to the specification. This system is implementable using the DNA strand displacement technique. The underlying configurability is embedded into primitive components and template modules, and thus the entire system is adaptive. Simulation of DNA strand displacement implementation confirmed the feasibility and superiority of the proposed synthesis flow. PMID:26352855

  10. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  11. Computer configuration for Ontario Hydro's new Energy Management System

    SciTech Connect

    Barrie, D.; Hill, D.S.; Yuen, A.

    1989-08-01

    In 1985, Ontario Hydro decided to build a new System Control Centre and install a new Energy Management System. This decision was primarily due to obsolescence, space restrictions and other site considerations rather than dissatisfaction with the existing Energy Management System. Indeed, the existing Energy Management System had several features (eg, the suite of custom-developed application programs) which were considered so valuable to the System Operators that they should be retained in the new Energy Management System. Nevertheless, because new hardware was being installed, it provided an opportunity to review the standards of performance demanded of the Energy Management System and technological advances that could be utilized to best effect.

  12. Demand management implementation in Southeast Asia

    SciTech Connect

    Tanaboriboon, Y.

    1995-12-31

    The need to apply transportation system management, to developing countries is urgent. Attempts to alleviate severe traffic congestion in their metropolises have so far failed to provide adequate solutions. The countries are faced with many difficulties because of the lack of sufficient financial resources together with their complex internal administrative and political problems. They are incapable of providing sufficient road space to cope with the escalating demand in private automobiles. This has led to excessive delays in urban traveling, environmental pollution problems, decline of road-based public transit services and deterioration of the quality of life in these metropolises. Demand management, in use for decades in the Western world, has also been recognized in Singapore`s famous area licensing scheme (ALS) making other Southeast Asian Metropolises aware of its advantages as an alternative in solving their chaotic traffic problems. However, realization is far different from implementation and still many metropolises are not able to apply the technique. Singapore and Thailand, two leaders among many other Southeast Asian regions in economics, tourism, trade and industry handle their problems far differently, especially the traffic congestion problem. While a number of demand management schemes have been implemented successfully in Singapore since 1975, Bangkok is still struggling to implement such measures to alleviate severe traffic congestion problems. This article intends to high light the successful practices and unsuccessful attempts of demand management techniques applied in Singapore and Bangkok.

  13. Configuration management manual as a tool for improving plant change controls

    SciTech Connect

    Craig, L.L. )

    1991-01-01

    Early vintage plants, such as Turkey Point at Florida Power and Light (FP and L) Company, were not provided with as much design documentation as later plants. At FP and L, programs were initiated to reconstruct the design bases, correct and update drawings at Turkey Point, and develop an overall configuration management program for both Turkey Point and St. Lucie plants. This paper discusses the Configuration Management Manual developed by plant and engineering personnel, which is used to train personnel to a common language and achieve better understanding of individual impact on configuration management.

  14. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  15. FPGA implementation of a configurable neuromorphic CPG-based locomotion controller.

    PubMed

    Barron-Zambrano, Jose Hugo; Torres-Huitzil, Cesar

    2013-09-01

    Neuromorphic engineering is a discipline devoted to the design and development of computational hardware that mimics the characteristics and capabilities of neuro-biological systems. In recent years, neuromorphic hardware systems have been implemented using a hybrid approach incorporating digital hardware so as to provide flexibility and scalability at the cost of power efficiency and some biological realism. This paper proposes an FPGA-based neuromorphic-like embedded system on a chip to generate locomotion patterns of periodic rhythmic movements inspired by Central Pattern Generators (CPGs). The proposed implementation follows a top-down approach where modularity and hierarchy are two desirable features. The locomotion controller is based on CPG models to produce rhythmic locomotion patterns or gaits for legged robots such as quadrupeds and hexapods. The architecture is configurable and scalable for robots with either different morphologies or different degrees of freedom (DOFs). Experiments performed on a real robot are presented and discussed. The obtained results demonstrate that the CPG-based controller provides the necessary flexibility to generate different rhythmic patterns at run-time suitable for adaptable locomotion.

  16. Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers

    SciTech Connect

    DALE, R.N.

    2000-05-01

    Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers.

  17. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  18. Current Practices in Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB)

    NASA Technical Reports Server (NTRS)

    Lohr, Gary W.; Williams, Daniel M.

    2008-01-01

    Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.

  19. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    SciTech Connect

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  20. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  1. Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan

    SciTech Connect

    KOCH, M.R.

    1999-11-16

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309, Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  2. Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)

    SciTech Connect

    WHITE, K.A.

    2000-11-28

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309, Rev. 1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  3. Heart failure disease management: implementation and outcomes.

    PubMed

    Whellan, David J

    2005-01-01

    Millions of dollars are being spent to identify new therapies to improve mortality and morbidity for the growing epidemic of patients sustaining heart failure. However, in clinical practice, these therapies are currently underused. To bridge the gap between proven therapies and clinical practice, the medical community has turned to disease management. Heart failure disease management interventions vary from vital-sign monitoring to multidisciplinary approaches involving a pharmacist, nutritionist, nurse practitioner, and physician. This review attempts to categorize these inventions based on location. We compared the published results from randomized, controlled trials of the following types of heart failure disease management interventions: inpatient, clinic visits, home visits, and telephone follow up. Although research shows an improvement in the quality of care and a decrease in hospitalizations for patients sustaining heart failure, the economic impact of disease management is still unclear. The current reimbursement structure is a disincentive to providers wanting to offer disease management services to patients sustaining heart failure. Additionally, the cost of providing disease management services such as additional clinical visits, patient education materials, or additional personnel time has not been well documented. Most heart failure disease management studies do confirm the concept that providing increased access to healthcare providers for an at-risk group of patients sustaining heart failure does improve outcomes. However, a large-scale randomized, controlled clinical trial based in the United States is needed to prove that this concept can be implemented beyond a single center and to determine how much it will cost patients, providers, healthcare systems, and payers.

  4. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  5. Implementation of remote monitoring and managing switches

    NASA Astrophysics Data System (ADS)

    Leng, Junmin; Fu, Guo

    2010-12-01

    In order to strengthen the safety performance of the network and provide the big convenience and efficiency for the operator and the manager, the system of remote monitoring and managing switches has been designed and achieved using the advanced network technology and present network resources. The fast speed Internet Protocol Cameras (FS IP Camera) is selected, which has 32-bit RSIC embedded processor and can support a number of protocols. An Optimal image compress algorithm Motion-JPEG is adopted so that high resolution images can be transmitted by narrow network bandwidth. The architecture of the whole monitoring and managing system is designed and implemented according to the current infrastructure of the network and switches. The control and administrative software is projected. The dynamical webpage Java Server Pages (JSP) development platform is utilized in the system. SQL (Structured Query Language) Server database is applied to save and access images information, network messages and users' data. The reliability and security of the system is further strengthened by the access control. The software in the system is made to be cross-platform so that multiple operating systems (UNIX, Linux and Windows operating systems) are supported. The application of the system can greatly reduce manpower cost, and can quickly find and solve problems.

  6. Uncovering middle managers' role in healthcare innovation implementation

    PubMed Central

    2012-01-01

    Background Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Discussion Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Summary Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation. PMID:22472001

  7. Implementation of a human milk management center.

    PubMed

    Spatz, Diane L; Schmidt, Katherine J; Kinzler, Sue

    2014-08-01

    Current hospital practices surrounding the use of human milk and fortification are suboptimal. Safety of milk preparation should be a priority, as should optimization of the milk to meet the nutritional needs of hospitalized infants. This article describes the implementation of a human milk management center (HMMC) at a children's hospital. This centralized center allows for milk to be safely prepared under aseptic technique. In addition, the HMMC staff can analyze milk composition. The widely variable nutrient composition of human milk has been well established and, therefore, should be considered when fortifying human milk. The HMMC staff have the ability to perform creamatocrits on milk, conduct human milk nutrient analysis, and make skim milk for infants. The processes for developing an HMMC are also detailed in this article.

  8. Implementing disease management in community pharmacy practice.

    PubMed

    Holdford, D; Kennedy, D T; Bernadella, P; Small, R E

    1998-01-01

    Disease management (DM) is a comprehensive approach to preventing and treating disease that: (1) targets patients with specific diseases; (2) provides integrated services across organizational and professional boundaries; (3) utilizes services based on the best scientific evidence available; and (4) focuses on outcomes. DM differs from pharmaceutical care in that pharmaceutical care targets not only patients with specific diseases but also those with risk factors for drug-related problems, a history of nonadherence, and frequent changes in medication regimens. Steps to starting a DM program include: (1) identifying a target population based on the population's strategic importance to the goals and aims of the organization; (2) assessing the organization's available resources, both internal and external; (3) defining key indicators with which to assess the program for the purposes of internal quality control and of obtaining compensation from third-party payers; (4) implementing the program using the best scientific methods available; and (5) assessing the impact of the program. The development of a smoking cessation program at a nationwide retail pharmacy chain is used as an example of a DM program initiated in community pharmacy practice. Pharmacists are well positioned to take a major role in DM, because they are accessible to the community and because DM frequently involves drug therapy. DM is also widely used in managed care. It is important that community pharmacists be closely involved in the DM approach as it evolves.

  9. Benefit Assessment for Metroplex Tactical Runway Configuration Management (mTRCM) in a Simulated Environment

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Robbins, Steven W.; Fenbert, James W.; Hartman, Christopher L.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, and monitoring the active runway configuration for suitability given existing factors. This report focuses on the metroplex environment, with two or more proximate airports having arrival and departure operations that are highly interdependent. The myriad of factors that affect metroplex opeations require consideration in arriving at runway configurations that collectively best serve the system as a whole. To assess the metroplex TRCM (mTRCM) benefit, the performance metrics must be compared with the actual historical operations. The historical configuration schedules can be viewed as the schedules produced by subject matter experts (SMEs), and therefore are referred to as the SMEs' schedules. These schedules were obtained from the FAA's Aviation System Performance Metrics (ASPM) database; this is the most representative information regarding runway configuration selection by SMEs. This report focused on a benefit assessment of total delay, transit time, and throughput efficiency (TE) benefits using the mTRCM algorithm at representative volumes for today's traffic at the New York metroplex (N90).

  10. Oak Ridge National Laboratory's (ORNL) Weigh-In-Motion (WIM) Configuration and Data Management Activities

    SciTech Connect

    Abercrombie, Robert K; Sheldon, Frederick T; Schlicher, Bob G

    2006-01-01

    The Oak Ridge National Laboratory (ORNL) involvement in the Weigh-in-Motion (WIM) research with both government agencies and private companies dates back to 1989. The discussion here will focus on the US Army's current need for an automated WIM system to weigh and determine the center-of-balance for military wheeled vehicles and cargo and the expanded uses of WIM data. ORNL is addressing configuration and data management issues as they relate to deployments for both military and humanitarian activities. The transition from the previous WIM Gen I to the current Gen II system illustrates a configuration and data management solution that ensures data integration, integrity, coherence and cost effectiveness. Currently, Army units use portable and fixed scales, tape measures, and calculators to determine vehicle axle, total weights and center of balance for vehicles prior to being transshipped via railcar, ship, or airlifted. Manually weighing and measuring all vehicles subject to these transshipment operations is time-consuming, labor-intensive, hazardous and is prone to human errors (e.g., misreading scales and tape measures, calculating centers of balance and wheel, axle, and vehicle weights, recording data, and transferring data from manually prepared work sheets into an electronic data base and aggravated by adverse weather conditions). Additionally, in the context of the military, the timeliness, safety, success, and effectiveness of airborne heavy-drop operations can be significantly improved by the use of an automated system to weigh and determine center of balance of vehicles while they are in motion. The lack of a standardized airlift-weighing system for joint service use also creates redundant weighing requirements at the cost of scarce resources and time. This case study can be judiciously expanded into commercial operations related to safety and enforcement. The WIM program will provide a means for the Army to automatically identify/weigh and monitor

  11. Implementing CORAL: An Electronic Resource Management System

    ERIC Educational Resources Information Center

    Whitfield, Sharon

    2011-01-01

    A 2010 electronic resource management survey conducted by Maria Collins of North Carolina State University and Jill E. Grogg of University of Alabama Libraries found that the top six electronic resources management priorities included workflow management, communications management, license management, statistics management, administrative…

  12. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... section was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... reference, include the following: (1) AAR S-4200, “Electronically Controlled Pneumatic (ECP)...

  13. PTC MathCAD and Workgroup Manager: Implementation in a Multi-Org System

    NASA Technical Reports Server (NTRS)

    Jones, Corey

    2015-01-01

    In this presentation, the presenter will review what was done at Kennedy Space Center to deploy and implement PTC MathCAD and PTC Workgroup Manager in a multi-org system. During the presentation the presenter will explain how they configured PTC Windchill to create custom soft-types and object initialization rules for their custom numbering scheme and why they choose these methods. This presentation will also include how to modify the EPM default soft-type file in the PTC Windchill server codebase folder. The presenter will also go over the code used in a start up script to initiate PTC MathCAD and PTC Workgroup Manager in the proper order, and also set up the environment variables when running both PTC Workgroup Manager and PTC Creo. The configuration.ini file the presenter used will also be reviewed to show you how to set up the PTC Workgroup Manager and customized it to their user community. This presentation will be of interest to administrators trying to create a similar set-up in either a single org or multiple org system deployment. The big take away will be ideas and best practices learned through implementing this system, and the lessons learned what to do and not to do when setting up this configuration. Attendees will be exposed to several different sets of code used and that worked well and will hear some limitations on what the software can accomplish when configured this way.

  14. Implementing Response to Intervention: Use of Innovation Configuration Maps within a Multiple-Case Study Analysis

    ERIC Educational Resources Information Center

    Fernando, Sheara

    2010-01-01

    The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…

  15. Implementing Proactive Network Management Solutions in the Residence Halls

    ERIC Educational Resources Information Center

    Bedi, Param

    2005-01-01

    This paper discusses how to implement networking solutions in residence halls at Arcadia University in Philadelphia. Sections of the paper include: (1) About Arcadia University; (2) Residence Halls Network; (3) How Campus Manager Helped Arcadia University; (4) What Is Campus Manager; (5) How Campus Manager Works; (6) Campus Manager Remediation…

  16. Analysis and Evaluation of Error-Proof Systems for Configuration Data Management in Railway Signalling

    NASA Astrophysics Data System (ADS)

    Shimazoe, Toshiyuki; Ishikawa, Hideto; Takei, Tsuyoshi; Tanaka, Kenji

    Recent types of train protection systems such as ATC require the large amounts of low-level configuration data compared to conventional types of them. Hence management of the configuration data is becoming more important than before. Because of this, the authors developed an error-proof system focusing on human operations in the configuration data management. This error-proof system has already been introduced to the Tokaido Shinkansen ATC data management system. However, as effectiveness of the system has not been presented objectively, its full perspective is not clear. To clarify the effectiveness, this paper analyses error-proofing cases introduced to the system, using the concept of QFD and the error-proofing principles. From this analysis, the following methods of evaluation for error-proof systems are proposed: metrics to review the rationality of required qualities are provided by arranging the required qualities according to hazard levels and work phases; metrics to evaluate error-proof systems are provided to improve their reliability effectively by mapping the error-proofing principles onto the error-proofing cases which are applied according to the required qualities and the corresponding hazard levels. In addition, these objectively-analysed error-proofing cases are available to be used as error-proofing-cases database or guidelines for safer HMI design especially for data management.

  17. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  18. Software Configuration Management for Safety-Related Applications in Space Systems: Extending the Application of the USAF 8-Step Method

    NASA Astrophysics Data System (ADS)

    Johnson, C. W.

    2010-09-01

    Configuration management ensures that the requirements and constraints, identified in previous stages of development, are preserved throughout the design, implementation and operation of complex systems. Space-related, software systems pose particular problems because, for instance, it can be hard to determine what code is actually running on a platform as successive updates are performed over many months of remote operation. It is, therefore, important we learn as much as possible from previous mishaps that have involved configuration management; given that software continues to play a critical role in the safety of many space missions. The following pages extend the US Air Force’s 8-Step Method to identify lessons learned from space related incidents. This approach builds on Boyd’s OODA(Observe, Orient, Decide and Act) Loop and provides a common framework for the analysis of these complex incidents. It is important to stress that the application of an existing general approach to problem solving, rather than the development of a specific approach for configuration management, is intended to reduce training costs and to increase the value added from existing investments in the use of the 8-Step Method. Many specialised software engineering techniques are not used because they cannot easily be applied within the financial limits and deadlines that constrain most space programmes. The closing sections of this paper identify areas for further work; in particular, we stress the importance of links with recent European Space Agency problem solving techniques that support the early-stage development of long duration space missions.

  19. Implementation of New Public Management in Norwegian Universities

    ERIC Educational Resources Information Center

    Frolich, Nicoline

    2005-01-01

    This article analyses the implementation of market-type mechanisms in the management of universities. The question of which cultural biases have been used in the implementation of New Public Management (NPM) in Norwegian universities is discussed. Cultural theory, institutional theory, and public policy studies are applied to the analysis of a…

  20. Managing Hardware Configurations and Data Products for the Canadian Hydrogen Intensity Mapping Experiment

    NASA Astrophysics Data System (ADS)

    Hincks, A. D.; Shaw, J. R.; Chime Collaboration

    2015-09-01

    The Canadian Hydrogen Intensity Mapping Experiment (CHIME) is an ambitious new radio telescope project for measuring cosmic expansion and investigating dark energy. Keeping good records of both physical configuration of its 1280 antennas and their analogue signal chains as well as the ˜100 TB of data produced daily from its correlator will be essential to the success of CHIME. In these proceedings we describe the database-driven software we have developed to manage this complexity.

  1. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  2. Design of a flight director/configuration management system for piloted STOL approaches

    NASA Technical Reports Server (NTRS)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1973-01-01

    The design and characteristics of a flight director for V/STOL aircraft are discussed. A configuration management system for piloted STOL approaches is described. The individual components of the overall system designed to reduce pilot workload to an acceptable level during curved, decelerating, and descending STOL approaches are defined. The application of the system to augmentor wing aircraft is analyzed. System performance checks and piloted evaluations were conducted on a flight simulator and the results are summarized.

  3. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    SciTech Connect

    Graf, F.A. Jr.

    1995-02-27

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System`s pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System.

  4. Configuration Control of a Mobile Dextrous Robot: Real-Time Implementation and Experimentation

    NASA Technical Reports Server (NTRS)

    Lim, David; Seraji, Homayoun

    1996-01-01

    This paper describes the design and implementation of a real-time control system with multiple modes of operation for a mobile dexterous manipulator. The manipulator under study is a kinematically redundant seven degree-of-freedom arm from Robotics Research Corporation, mounted on a one degree-of-freedom motorized platform.

  5. Configuration Management (CM) Support for KM Processes at NASA/Johnson Space Center (JSC)

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2010-01-01

    Collection and processing of information are critical aspects of every business activity from raw data to information to an executable decision. Configuration Management (CM) supports KM practices through its automated business practices and its integrated operations within the organization. This presentation delivers an overview of JSC/Space Life Sciences Directorate (SLSD) and its methods to encourage innovation through collaboration and participation. Specifically, this presentation will illustrate how SLSD CM creates an embedded KM activity with an established IT platform to control and update baselines, requirements, documents, schedules, budgets, while tracking changes essentially managing critical knowledge elements.

  6. IMPLEMENTING SCIENTIFIC SIMULATION CODES HIGHLY TAILORED FOR VECTOR ARCHITECTURES USING CUSTOM CONFIGURABLE COMPUTING MACHINES

    NASA Technical Reports Server (NTRS)

    Rutishauser, David K.

    2006-01-01

    The motivation for this work comes from an observation that amidst the push for Massively Parallel (MP) solutions to high-end computing problems such as numerical physical simulations, large amounts of legacy code exist that are highly optimized for vector supercomputers. Because re-hosting legacy code often requires a complete re-write of the original code, which can be a very long and expensive effort, this work examines the potential to exploit reconfigurable computing machines in place of a vector supercomputer to implement an essentially unmodified legacy source code. Custom and reconfigurable computing resources could be used to emulate an original application's target platform to the extent required to achieve high performance. To arrive at an architecture that delivers the desired performance subject to limited resources involves solving a multi-variable optimization problem with constraints. Prior research in the area of reconfigurable computing has demonstrated that designing an optimum hardware implementation of a given application under hardware resource constraints is an NP-complete problem. The premise of the approach is that the general issue of applying reconfigurable computing resources to the implementation of an application, maximizing the performance of the computation subject to physical resource constraints, can be made a tractable problem by assuming a computational paradigm, such as vector processing. This research contributes a formulation of the problem and a methodology to design a reconfigurable vector processing implementation of a given application that satisfies a performance metric. A generic, parametric, architectural framework for vector processing implemented in reconfigurable logic is developed as a target for a scheduling/mapping algorithm that maps an input computation to a given instance of the architecture. This algorithm is integrated with an optimization framework to arrive at a specification of the architecture parameters

  7. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    SciTech Connect

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  8. Implementation of Integrated System Fault Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark

    2008-01-01

    Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.

  9. A Strategy for Implementing the School Management Team.

    ERIC Educational Resources Information Center

    Ohio School Boards Association, Columbus.

    To aid school administrators, this guidebook presents information on planning, implementing, and evaluating a school management team approach. The first section reviews the definition and philosophy of the management team, discusses propositions about and characteristics of management teams, and describes the application of team decision-making to…

  10. INCEPTION, DESIGN AND IMPLEMENTATION OF A MANAGEMENT INFORMATION SYSTEM.

    ERIC Educational Resources Information Center

    LEWIS, DAVID ALFRED

    THE PURPOSE OF THIS PAPER IS TO DEVELOP AN INSTRUCTIONAL AND SYSTEMATIC APPROACH TO THE DESIGN AND IMPLEMENTATION OF A MANAGEMENT INFORMATION SYSTEM. GOALS, OBJECTIVES, STRUCTURE, AND RESPONSIBILITIES FORM THE FRAMEWORK OF A MANAGEMENT INFORMATION SYSTEM. THE TASK OF A MANAGEMENT INFORMATION SYSTEM IS TO PROCESS RAW DATA IN SUCH A WAY AS TO…

  11. Barriers to Implementation of Case Management for Patients With Dementia: A Systematic Mixed Studies Review

    PubMed Central

    Khanassov, Vladimir; Vedel, Isabelle; Pluye, Pierre

    2014-01-01

    PURPOSE Results of case management designed for patients with dementia and their caregivers in community-based primary health care (CBPHC) were inconsistent. Our objective was to identify the relationships between key outcomes of case management and barriers to implementation. METHODS We conducted a systematic mixed studies review (including quantitative and qualitative studies). Literature search was performed in MEDLINE, PsycINFO, Embase, and Cochrane Library (1995 up to August 2012). Case management intervention studies were used to assess clinical outcomes for patients, service use, caregiver outcomes, satisfaction, and cost-effectiveness. Qualitative studies were used to examine barriers to case management implementation. Patterns in the relationships between barriers to implementation and outcomes were identified using the configurational comparative method. The quality of studies was assessed using the Mixed Methods Appraisal Tool. RESULTS Forty-three studies were selected (31 quantitative and 12 qualitative). Case management had a limited positive effect on behavioral symptoms of dementia and length of hospital stay for patients and on burden and depression for informal caregivers. Interventions that addressed a greater number of barriers to implementation resulted in increased number of positive outcomes. Results suggested that high-intensity case management was necessary and sufficient to produce positive clinical outcomes for patients and to optimize service use. Effective communication within the CBPHC team was necessary and sufficient for positive outcomes for caregivers. CONCLUSIONS Clinicians and managers who implement case management in CBPHC should take into account high-intensity case management (small caseload, regular proactive patient follow-up, regular contact between case managers and family physicians) and effective communication between case managers and other CBPHC professionals and services. PMID:25354410

  12. The Influence of Leadership in Implementing Management Systems

    NASA Astrophysics Data System (ADS)

    Nae, Ilie; Solomon, Gheorghe; Severin, Irina

    2014-12-01

    This paper presents a new perspective of the implementation of Management Systems within organizations in order to increase the success rate. The objective is to analyse how the leadership could influence positively or negatively the implementation, according to the leadership approach chosen. It offers a method to analyse the maturity of the leadership for any organization, based on existing leadership models, completing these models with specificities of a Management System. The Maturity Grid is extended to key elements of the Organizational Leadership: Strategic Planning, Process and Performance. The results expected are to change the current understanding of leadership during a Management System implementation(leadership seen as a principle) to an active leadership, implemented at organizational level. It propose an alternative of the classic management approach, to a Performance Management approach, that integrates naturally the leadership in all processes and methods

  13. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  14. e-VLBI Access Point (eAXP) - a centralized control and EGAE configuration / management application

    NASA Astrophysics Data System (ADS)

    Ruszczyk, Chester Whitney, Alan

    Setting up experiments to utilize Experiment Guided Adaptive Endpoint (EGAE) and e-VLBI is presently a complex and time intensive process requiring scientific, Mark5 and networking knowledge. There is no central access to point to configure and manage all of these aspects of an experiment. The e-VLBI Access Point (eAXP) is a centralized control plane management tool that offers a GUI interface to augment the command line interface presently being used to set up and conduct experiments. eAXP contains three major toolsets: one to set up and execute an experiment using real-time or non-real time modes; the second to configure and manage EGAE; and a third to view statistics of the experiments. Initially the overall system architecture for eAXP is presented, followed by details of the Experiment Profiler toolset including screen shots of the system presently being tested. This will be followed by how eAXP will support real-time modes interfacing to the Dynamic Resource Allocation over GMPLS Optical Network (DRAGON) resource management project.

  15. Network- and network-element-level parameters for configuration, fault, and performance management of optical networks

    NASA Astrophysics Data System (ADS)

    Drion, Christophe; Berthelon, Luc; Chambon, Olivier; Eilenberger, Gert; Peden, Francoise R.; Jourdan, Amaury

    1998-10-01

    With the high interest of network operators and manufacturers for wavelength division multiplexing (WDM) networking technology, the need for management systems adapted to this new technology keeps increasing. We investigated this topic and produced outputs through the specification of the functional architecture, network layered model, and through the development of new, TMN- based, information models for the management of optical networks and network elements. Based on these first outputs, defects in each layer together with parameters for performance management/monitoring have been identified for each type of optical network element, and each atomic function describing the element, including functions for both the transport of payload signals and of overhead information. The list of probable causes has been established for the identified defects. A second aspect consists in the definition of network-level parameters, if such photonic technology-related parameters are to be considered at this level. It is our conviction that some parameters can be taken into account at the network level for performance management, based on physical measurements within the network. Some parameters could possibly be used as criteria for configuration management, in the route calculation processes, including protection. The outputs of these specification activities are taken into account in the development of a manageable WDM network prototype which will be used as a test platform to demonstrate configuration, fault, protection and performance management in a real network, in the scope of the ACTS-MEPHISTO project. This network prototype will also be used in a larger size experiment in the context of the ACTS-PELICAN field trial (Pan-European Lightwave Core and Access Network).

  16. Multimedia case management system implemented in Java

    NASA Astrophysics Data System (ADS)

    Stewart, Howard D.; Davis, Midge L.; Handy, Dale L.; Kvarfordt, Kent B.; Ford, Glenn

    1999-01-01

    Managing the timely access of information is a major challenge facing law enforcement agencies. One of the areas of greatest need is that of the case management process. During the course of FY98, the Office of National Drug Control Policy (ONDCP), the Counterdrug Technology Assessment Center (CTAC), the Idaho National Engineering and Environmental Laboratory (INEEL), and the Criminal Investigative Bureau (CIB) of the state of Idaho, created a Northwest testbed to develop and integrate a multimedia case management system. A system was developed to assist investigators in tracking and maintaining investigative cases and improving access to internal and external data resources. In this paper, we discuss the results of our case management system development and the ability to present state and federal information incorporating object oriented and multimedia techniques. We then outline our plans for future research and development.

  17. Implementing AIM-based monitoring for natural resource management

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...

  18. The Agway Management Development Program: Design and Implementation

    ERIC Educational Resources Information Center

    Barth, Anthony L.; Engfer, Robert T.

    1977-01-01

    Focus is on the Agway (a farm supply and food marketing cooperative) retail store system in this informational case history and how-to approach for designing, developing, and implementing a formal corporate management program. (Editor/TA)

  19. Keys for successful implementation of total quality management in hospitals.

    PubMed

    Carman, James M; Shortell, Stephen M; Foster, Richard W; Hughes, Edward F X; Boerstler, Heidi; O' Brien, James L; O'Connor, Edward J

    2010-01-01

    Editor's Note: This article reports the findings of an analysis of the implementation of continuous quality improvement (CQI) or total quality management (TQM) programs in 10 hospitals. This analysis is the result of a 2-year study designed to identify and assess the ingredients that lead to the successful implementation of CQI programs in acute care hospitals. This article first appeared in Health Care Management Review 21(1), 48-60. Copyright © 1996 Aspen Publishers, Inc. (Lippincott Williams & Wilkins).

  20. Implementation of SAP Waste Management System

    SciTech Connect

    Frost, M.L.; LaBorde, C.M.; Nichols, C.D.

    2008-07-01

    The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

  1. Green Revolving Funds: An Introductory Guide to Implementation & Management

    ERIC Educational Resources Information Center

    Indvik, Joe; Foley, Rob; Orlowski, Mark

    2013-01-01

    The goal of this introductory implementation guide is to provide practical guidance for designing, implementing, and managing a green revolving fund (GRF) at a college, university, or other institution. The GRF model is widespread in higher education, with at least 79 funds in operation in North America representing over $111 million in committed…

  2. Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamonogkolkij, Nipa; Lohr, Gary W.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high

  3. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be

  4. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  5. Factors that influence producer decisions to implement management strategies.

    PubMed

    Field, Thomas G

    2014-12-01

    Cow-calf enterprises in the USA are widely divergent in size, locale, resource availability, management skill, and market focus. Furthermore, variation exists in dependence on the cow-calf enterprise as a primary source of income, perception about the utility of a particular management practice or technology, and assessment of cost: benefit resulting from implementation impact decisions. Enterprises with larger cow inventories, greater dependence on income from the cattle enterprise, and that retain ownership further into the supply chain beyond the cow-calf operation are more likely to institute management protocols such as vaccination programs, defined calving seasons, and reproductive technologies. Successful cow-calf managers place the highest priority on herd nutrition, pasture and range management, herd health, financial management marketing, production management, and genetics. Management practices are more likely to be adopted when they align with a manager's perception of the utility, labor availability, favorable cost: benefit outcomes and profit motivation.

  6. Factors that influence producer decisions to implement management strategies.

    PubMed

    Field, Thomas G

    2014-12-01

    Cow-calf enterprises in the USA are widely divergent in size, locale, resource availability, management skill, and market focus. Furthermore, variation exists in dependence on the cow-calf enterprise as a primary source of income, perception about the utility of a particular management practice or technology, and assessment of cost: benefit resulting from implementation impact decisions. Enterprises with larger cow inventories, greater dependence on income from the cattle enterprise, and that retain ownership further into the supply chain beyond the cow-calf operation are more likely to institute management protocols such as vaccination programs, defined calving seasons, and reproductive technologies. Successful cow-calf managers place the highest priority on herd nutrition, pasture and range management, herd health, financial management marketing, production management, and genetics. Management practices are more likely to be adopted when they align with a manager's perception of the utility, labor availability, favorable cost: benefit outcomes and profit motivation. PMID:25497503

  7. Provenance management in Swift with implementation details.

    SciTech Connect

    Gadelha, L. M. R; Clifford, B.; Mattoso, M.; Wilde, M.; Foster, I.

    2011-04-01

    The Swift parallel scripting language allows for the specification, execution and analysis of large-scale computations in parallel and distributed environments. It incorporates a data model for recording and querying provenance information. In this article we describe these capabilities and evaluate interoperability with other systems through the use of the Open Provenance Model. We describe Swift's provenance data model and compare it to the Open Provenance Model. We also describe and evaluate activities performed within the Third Provenance Challenge, which consisted of implementing a specific scientific workflow, capturing and recording provenance information of its execution, performing provenance queries, and exchanging provenance information with other systems. Finally, we propose improvements to both the Open Provenance Model and Swift's provenance system.

  8. The Implementation of Technology-Based SME Management Development Programmes

    ERIC Educational Resources Information Center

    Carr, James

    2005-01-01

    Learning technology is seen as one solution to the problem of delivering management training in Small and Medium-sized Enterprises (SMEs). This paper investigates how the Higher Education (HE) sector can use its growing expertise in learning technology implementation to develop effective SME management development solutions. It is found that there…

  9. Designing and Implementing Teacher Performance Management Systems: Pitfalls and Possibilities

    ERIC Educational Resources Information Center

    Wiener, Ross; Jacobs, Ariel

    2011-01-01

    As new performance-management-related policies go from idea to implementation, policy makers and education leaders will be called upon to flesh-out what are still broad principles in many areas. This represents a significant inflection point for the teaching profession and the management of public school systems. Early decisions will determine…

  10. Xcel Energy implements an alarm management strategy

    SciTech Connect

    Bass, J.; Abreu, G.

    2007-11-15

    Not so long ago, Xcel Energy's Pawnee Station, a 505 MW coal-fired generating station in Brush, Colorado, USA was commonly generating 300 to 400 alarms per 8-hour shift. The article describes how the alarm system was revised and improved by tackling alarm dead-bands, and rationalising alarms for routine events. Operators are trained to understand the functions of alarm management components, their use and response, and obtain feedback. Today the power station reports about one alarm per hour. 3 photos.

  11. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    SciTech Connect

    Smith, P.R.; Sarfaty, R.

    1993-05-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility`s physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables.

  12. ANALYSIS OF SPECIAL WASTE CONFIGURATIONS AT THE SRS WASTE MANAGEMENT FACILITIES

    SciTech Connect

    Casella, V; Raymond Dewberry, R

    2007-05-14

    Job Control Waste (JCW) at the Savannah River Site (SRS) Solid Waste Management Facilities (SWMF) may be disposed of in special containers, and the analysis of these containers requires developing specific analysis methodologies. A method has been developed for the routine assay of prohibited items (liquids, etc.) contained in a 30-gallon drum that is then placed into a 55-gallon drum. Method development consisted of system calibration with a NIST standard at various drum-to-detector distances, method verification with a liquid sample containing a known amount of Pu-238, and modeling the inner container using Ortec Isotopic software. Using this method for measurement of the known standard in the drum-in-drum configuration produced excellent agreement (within 15%) with the known value. Savannah River Site Solid Waste Management also requested analysis of waste contained in large black boxes (commonly 18-feet x 12-feet x 7-feet) stored at the SWMF. These boxes are frequently stored in high background areas and background radiation must be considered for each analysis. A detection limit of less than 150 fissile-gram-equivalents (FGE) of TRU waste is required for the black-box analyses. There is usually excellent agreement for the measurements at different distances and measurement uncertainties of about 50% are obtained at distances of at least twenty feet from the box. This paper discusses the experimental setup, analysis and data evaluation for drum-in-drum and black box waste configurations at SRS.

  13. Library involvement in the implementation of a course management system.

    PubMed

    Lovett, Deborah G

    2004-01-01

    Course management system software has much to offer the faculty and students in universities that adopt this technology. Libraries have used this technology to provide links to library resources, but they can also have a role in implementing the adoption of the course management software. The Penn State College of Medicine successfully implemented the ANGEL course management system under the guidance of a medical librarian. Tasks specific to the librarian included communication and promotion of ANGEL, in addition to providing training and technical support.

  14. Implementing computer information systems for hospital-based case management.

    PubMed

    Williams, F G; Netting, F E; Engstrom, K M

    1991-01-01

    Like all health care services, case management is a process that relies on information. Based on the experiences in implementing computer information systems in six hospital-based case management programs, several financial, technical, and management issues are reviewed. These issues, which are also relevant for other specialized hospital-based programs, include information priorities, user acceptance, quantifying data, data entry methods, data security, and systems integration. The lessons learned regarding these issues are discussed, and categories of software alternatives are presented.

  15. Implementation of an epilepsy self-management protocol.

    PubMed

    Cole, Kimberly A; Gaspar, Phyllis M

    2015-02-01

    It is essential that patients with epilepsy receive educational information about their disease and its management, but there is dissatisfaction with the education received. The purposes of this evidence-based project were to examine the current knowledge level and disease management behaviors of patients with epilepsy in an outpatient clinic and to measure the effectiveness of implementing a self-management protocol using the Epilepsy Self-Management Scale (ESMS). Pender's health promotion model and Rogers' diffusion of innovation theory were used to guide the development and completion of this project. An evidence-based epilepsy self-management protocol was developed and implemented at an outpatient neurology clinic by an interprofessional clinic team that consisted of (a) evaluation of self-management behaviors (ESMS), (b) individual education using the ESMS and developed resources, (c) follow-up telephone call, and (d) measurement of outcomes of the self-management protocol (patient self-management [ESMS] and process). Twenty patients participated in all or portions of the protocol. Scores on the ESMS increased from preimplementation to postimplementation of the protocol (t = -2.67). Seizure management and information management were identified as the most difficult self-management areas. Recommended changes in protocol implementation include adding information about safety measures such as medical alert bracelets and driving to the educational packets. Follow-up telephone calls were discontinued because of difficulties reaching patients. The results of this study suggest that the ESMS is an acceptable tool for evaluating patients' self-management behaviors. Epilepsy self-management protocols need to include both verbal and written educational materials. Educating patients with epilepsy about positive self-management behaviors may lead to better health outcomes.

  16. Understanding barriers to implementation of an adaptive land management program.

    PubMed

    Jacobson, Susan K; Morris, Julie K; Sanders, J Scott; Wiley, Eugene N; Brooks, Michael; Bennetts, Robert E; Percival, H Franklin; Marynowski, Susan

    2006-10-01

    The Florida Fish and Wildlife Conservation Commission manages over 650,000 ha, including 26 wildlife management and environmental areas. To improve management, they developed an objective-based vegetation management (OBVM) process that focuses on desired conditions of plant communities through an adaptive management framework. Our goals were to understand potential barriers to implementing OBVM and to recommend strategies to overcome barriers. A literature review identified 47 potential barriers in six categories to implementation of adaptive and ecosystem management: logistical, communication, attitudinal, institutional, conceptual, and educational. We explored these barriers through a bureau-wide survey of 90 staff involved in OBVM and personal interviews with area managers, scientists, and administrators. The survey incorporated an organizational culture assessment instrument to gauge how institutional factors might influence OBVM implementation. The survey response rate was 69%. Logistics and communications were the greatest barriers to implementing OBVM. Respondents perceived that the agency had inadequate resources for implementing OBVM and provided inadequate information. About one-third of the respondents believed OBVM would decrease their job flexibility and perceived greater institutional barriers to the approach. The 43% of respondents who believed they would have more responsibility under OBVM also had greater attitudinal barriers. A similar percentage of respondents reported OBVM would not give enough priority to wildlife. Staff believed that current agency culture was hierarchical but preferred a culture that would provide more flexibility for adaptive management and would foster learning from land management activities. In light of the barriers to OBVM, we recommend the following: (1) mitigation of logistical barriers by addressing real and perceived constraints of staff, funds, and other resources in a participatory manner; (2) mitigation of

  17. Understanding barriers to implementation of an adaptive land management program

    USGS Publications Warehouse

    Jacobson, S.K.; Morris, J.K.; Sanders, J.S.; Wiley, E.N.; Brooks, M.; Bennetts, R.E.; Percival, H.F.; Marynowski, S.

    2006-01-01

    The Florida Fish and Wildlife Conservation Commission manages over 650,000 ha, including 26 wildlife management and environmental areas. To improve management, they developed an objective-based vegetation management (OBVM) process that focuses on desired conditions of plant communities through an adaptive management framework. Our goals were to understand potential barriers to implementing OBVM and to recommend strategies to overcome barriers. A literature review identified 47 potential barriers in six categories to implementation of adaptive and ecosystem management: logistical, communication, attitudinal, institutional, conceptual, and educational. We explored these barriers through a bureau-wide survey of 90 staff involved in OBVM and personal interviews with area managers, scientists, and administrators. The survey incorporated an organizational culture assessment instrument to gauge how institutional factors might influence OBVM implementation. The survey response rate was 69%. Logistics and communications were the greatest barriers to implementing OBVM. Respondents perceived that the agency had inadequate resources for implementing OBVM and provided inadequate information. About one-third of the respondents believed OBVM would decrease their job flexibility and perceived greater institutional barriers to the approach. The 43% of respondents who believed they would have more responsibility under OBVM also had greater attitudinal barriers. A similar percentage of respondents reported OBVM would not give enough priority to wildlife. Staff believed that current agency culture was hierarchical but preferred a culture that would provide more flexibility for adaptive management and would foster learning from land management activities. In light of the barriers to OBVM, we recommend the following: (1) mitigation of logistical barriers by addressing real and perceived constraints of staff, funds, and other resources in a participatory manner; (2) mitigation of

  18. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management...

  19. Implementing performance management in the Irish Health Sector.

    PubMed

    Byrne, Michael

    2006-01-01

    To realize the goals of successive health strategies, managers in the Irish Health Sector will have to proactively facilitate optimal employee performance in line with policy objectives. Along with developing employee and teams' capabilities, these managers have begun to implement performance management to achieve the latter. However, there typically are a variety of foundational organizational characteristics required for the successful implementation of performance management. These include providing top-down support for line management buy-in, providing ongoing managerial and performance management training so that trusting relationships and a culture of consensus and cooperation are developed, and appropriately managing expectations. Agreement on employee role definitions and provision of team-based conflict resolution training is also needed to facilitate performance management. There is a need for negotiated performance indicators that are of various types, specific, measurable, and aligned with strategy objectives. Associated reward systems need to be holistic and imaginative, and personal development plans need to have a broader focus than merely improving current job skills and performance. Performance review needs to be ongoing, conducted in a transparent manner, and allocated sufficient discussion time. Managers also need to be mindful of managing overperformance.

  20. Managing multiple masculinities in donor insemination: doctors configuring infertile men and sperm donors in Taiwan.

    PubMed

    Wu, Chia-Ling

    2011-01-01

    This article investigates how doctors configured infertile men and sperm donors in the development of donor insemination (DI) in Taiwan. In the initial stage (1950s-1970s) doctors adjusted clinical procedures to repair the deformed gender identities of infertile men. To expand DI in the late 1970s and early 1980s, doctors stressed the positive eugenics of DI by spotlighting the high intelligence of donors, playing down biological patrilineage and re-emphasising the contribution of men of higher rank in society. In the mid-1980s, when donors came to be seen as potential carriers of fatal diseases like acquired immune deficiency syndrome, doctors managed to associate risky donors with socially stigmatised men, and therefore perpetuate the conventional hierarchy of masculinities. As the intracytoplasmic sperm injection emerged in the early 1990s doctors quickly presented infertile men as universally longing for biological fatherhood and hence devalued DI in an attempt to augment paternal masculinity. These diverse configuration activities come together to create a socio-technical network of DI that most of the time perpetuates the reigning gender order, rather than destabilising it. I argue the importance of incorporating various types of participants in analysis to understand the changing dynamics of multiple masculinities along with the development of DI.

  1. Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

    NASA Technical Reports Server (NTRS)

    Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.

    2009-01-01

    Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

  2. Configuration management and software measurement in the Ground Systems Development Environment (GSDE)

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    A set of functional requirements for software configuration management (CM) and metrics reporting for Space Station Freedom ground systems software are described. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the Space Station Training Facility (SSTF) and the Space Station Control Center (SSCC), and the target systems for SSCC and SSTF. The focus is on the CM of the software following delivery to NASA and on the software metrics that relate to the quality and maintainability of the delivered software. The CM and metrics requirements address specific problems that occur in large-scale software development. Mechanisms to assist in the continuing improvement of mission operations software development are described.

  3. Millennium regional PACS management: strategies for successful implementation

    NASA Astrophysics Data System (ADS)

    Levin, Brad; Romlein, John R.; Gac, Robert J., Jr.; Chacko, Anna K.; Radvany, Martin

    2000-05-01

    With the advent of the new Millennium, Picture Archive and Communications System (PACS) technology has matured to levels sufficient to support open systems based, regional implementations. This shifts the site-centric PACS paradigm into broader scale, impacting facilities, workflow, business plans and ultimately patient care on a regional basis. Prudent and effective management of a regional implementation is critical to overall project success based upon a number of competing influences fundamental to the PACS including network infrastructure, clinical workflow, acquisition modalities, planning documentation, site preparation, acceptance testing, project communication, interface integration issues, etc. Risk mitigation is possible by understanding and managing the interrelationships of these influences through a phased approach with embedded management controls. The overall phases of regional implementation are not unlike site-centric implementations, consisting of Discovery, Planning, Preparation, Installation; Acceptance and Warranty/Maintenance; however, details which manifest over time are what provide significant management challenges. When balanced using a culturally reinforced policy of open, frequent and hands-on communication, regional PACS projects can be successfully implemented maintaining budget, schedule and scope thresholds.

  4. Management implementation plan for a safety analysis and review system

    SciTech Connect

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  5. Avoiding the pitfalls of adaptive management implementation in Swedish silviculture.

    PubMed

    Rist, Lucy; Felton, Adam; Mårald, Erland; Samuelsson, Lars; Lundmark, Tomas; Rosvall, Ola

    2016-02-01

    There is a growing demand for alternatives to Sweden's current dominant silvicultural system, driven by a desire to raise biomass production, meet environmental goals and mitigate climate change. However, moving towards diversified forest management that deviates from well established silvicultural practices carries many uncertainties and risks. Adaptive management is often suggested as an effective means of managing in the context of such complexities. Yet there has been scepticism over its appropriateness in cases characterised by large spatial extents, extended temporal scales and complex land ownership-characteristics typical of Swedish forestry. Drawing on published research, including a new paradigm for adaptive management, we indicate how common pitfalls can be avoided during implementation. We indicate the investment, infrastructure, and considerations necessary to benefit from adaptive management. In doing so, we show how this approach could offer a pragmatic operational model for managing the uncertainties, risks and obstacles associated with new silvicultural systems and the challenges facing Swedish forestry. PMID:26744049

  6. Avoiding the pitfalls of adaptive management implementation in Swedish silviculture.

    PubMed

    Rist, Lucy; Felton, Adam; Mårald, Erland; Samuelsson, Lars; Lundmark, Tomas; Rosvall, Ola

    2016-02-01

    There is a growing demand for alternatives to Sweden's current dominant silvicultural system, driven by a desire to raise biomass production, meet environmental goals and mitigate climate change. However, moving towards diversified forest management that deviates from well established silvicultural practices carries many uncertainties and risks. Adaptive management is often suggested as an effective means of managing in the context of such complexities. Yet there has been scepticism over its appropriateness in cases characterised by large spatial extents, extended temporal scales and complex land ownership-characteristics typical of Swedish forestry. Drawing on published research, including a new paradigm for adaptive management, we indicate how common pitfalls can be avoided during implementation. We indicate the investment, infrastructure, and considerations necessary to benefit from adaptive management. In doing so, we show how this approach could offer a pragmatic operational model for managing the uncertainties, risks and obstacles associated with new silvicultural systems and the challenges facing Swedish forestry.

  7. Module Configuration

    DOEpatents

    Oweis, Salah; D'Ussel, Louis; Chagnon, Guy; Zuhowski, Michael; Sack, Tim; Laucournet, Gaullume; Jackson, Edward J.

    2002-06-04

    A stand alone battery module including: (a) a mechanical configuration; (b) a thermal management configuration; (c) an electrical connection configuration; and (d) an electronics configuration. Such a module is fully interchangeable in a battery pack assembly, mechanically, from the thermal management point of view, and electrically. With the same hardware, the module can accommodate different cell sizes and, therefore, can easily have different capacities. The module structure is designed to accommodate the electronics monitoring, protection, and printed wiring assembly boards (PWAs), as well as to allow airflow through the module. A plurality of modules may easily be connected together to form a battery pack. The parts of the module are designed to facilitate their manufacture and assembly.

  8. Integrated System Health Management (ISHM) Implementation in Rocket Engine Testing

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera

    2010-01-01

    A pilot operational ISHM capability has been implemented for the E-2 Rocket Engine Test Stand (RETS) and a Chemical Steam Generator (CSG) test article at NASA Stennis Space Center. The implementation currently includes an ISHM computer and a large display in the control room. The paper will address the overall approach, tools, and requirements. It will also address the infrastructure and architecture. Specific anomaly detection algorithms will be discussed regarding leak detection and diagnostics, valve validation, and sensor validation. It will also describe development and use of a Health Assessment Database System (HADS) as a repository for measurements, health, configuration, and knowledge related to a system with ISHM capability. It will conclude with a discussion of user interfaces, and a description of the operation of the ISHM system prior, during, and after testing.

  9. Implementation of School-Based Management in Indonesia. Monograph

    ERIC Educational Resources Information Center

    Vernez, Georges; Karam, Rita; Marshall, Jeffery H.

    2012-01-01

    This study provides a quantitative and qualitative status report on the implementation of school-based management (SBM) in Indonesia, identifies factors associated with the successful practices of SBM, and assesses SBM effects on student achievement eight years after its inception. The authors' findings are based on face-to-face surveys of…

  10. School-Based Management: Rationale and Implementation Guidelines.

    ERIC Educational Resources Information Center

    Oswald, Lori Jo

    1995-01-01

    School-based management (SBM), the decentralization of decision-making authority to the school site, comes in many variations. However, all forms of SBM require a rethinking of how and where budgeting, curriculum, and personnel decisions are made. This bulletin provides an overview of what SBM is and how it is implemented by summarizing some of…

  11. Managing E-Learning Strategies: Design, Delivery, Implementation and Evaluation

    ERIC Educational Resources Information Center

    Khan, Badrul

    2005-01-01

    "Managing E-Learning Strategies: Design, Delivery, Implementation and Evaluation" provides readers with a broad understanding of the emerging field of e-learning and also advises readers on the issues that are critical to the success of a meaningful e-learning environment. It walks you through the various factors critical to developing, evaluating…

  12. A Necessary Evil: The Experiences of Managers Implementing Downsizing Programmes

    ERIC Educational Resources Information Center

    Noronha, Ernesto; D'Cruz, Premilla

    2006-01-01

    This paper presents the findings of a phenomenological study, which describes the experiences of human resource (HR) managers implementing a downsizing program in a steel manufacturing organization in India. Data were collected through conversational interviews. Following van Manens sententious analytic approach, the core theme of a necessary…

  13. Transitions in Classroom Technology: Instructor Implementation of Classroom Management Software

    ERIC Educational Resources Information Center

    Ackerman, David; Chung, Christina; Sun, Jerry Chih-Yuan

    2014-01-01

    The authors look at how business instructor needs are fulfilled by classroom management software (CMS), such as Moodle, and why instructors are sometimes slow to implement it. Instructors at different universities provided both qualitative and quantitative responses regarding their use of CMS. The results indicate that the top needs fulfilled by…

  14. Dryden Flight Research Center Critical Chain Project Management Implementation

    NASA Technical Reports Server (NTRS)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  15. Subsonic Aerodynamic Assessment of Vortex Flow Management Devices on a High-Speed Civil Transport Configuration

    NASA Technical Reports Server (NTRS)

    Campbell, Bryan A.; Applin, Zachary T.; Kemmerly, Guy T.

    1999-01-01

    An experimental investigation of the effects of leading-edge vortex management devices on the subsonic performance of a high-speed civil transport (HSCT) configuration was conducted in the Langley 14- by 22-Foot Subsonic Tunnel. Data were obtained over a Mach number range of 0.14 to 0.27, with corresponding chord Reynolds numbers of 3.08 x 10 (sup 6) to 5.47 x 10 (sup 6). The test model was designed for a cruise Mach number of 2.7. During the subsonic high-lift phase of flight, vortical flow dominates the upper surface flow structure, and during vortex breakdown, this flow causes adverse pitch-up and a reduction of usable lift. The experimental results showed that the beneficial effects of small leading-edge vortex management devices located near the model reference center were insufficient to substantially affect the resulting aerodynamic forces and moments. However, devices located at or near the wiring apex region demonstrated potential for pitch control with little effect on overall lift.

  16. Implementing total quality management (TQM) in health-care laboratories.

    PubMed

    Westgard, J O; Barry, P L; Tomar, R H

    1991-01-01

    Health-care organizations are beginning to apply the principles of total quality management (TQM). Implementing TQM in a health-care laboratory requires incorporating quality improvement (QI) and quality planning (QP) with quality laboratory practices (QLP), quality control (QC), and quality assurance (QA) to provide a complete quality management system. QI and QP can be initiated by developing a strategic plan as a pilot QI project. QI project teams are then introduced to accomplish the highest priority goals. This implementation approach improves strategic planning by using group problem-solving tools and techniques, such as process flow charts, brainstorming, nominal group, fishbone diagrams, consensus decision making, and Pareto analysis. The approach also improves the success of project teams by providing a clear management agenda and a commitment to project-by-project QI.

  17. Implementation Of Quality Management System For Irradiation Processing Services

    NASA Astrophysics Data System (ADS)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  18. Advances in Provenance Tracking and Configuration Management for Earth Science Data

    NASA Astrophysics Data System (ADS)

    Barkstrom, B. R.

    2008-12-01

    Production of Earth science data involves two different production paradigms: 1. Large scale, batch production in which a network of programs and files create a collection of data for access by users 2. Small scale, fine-grained production in which users interact with data in files or databases These two paradigms lead to two different models for configuration management of data. The first model is one that recognizes that data production is similar to other large-scale manufacturing processes and inventories both the collection of files, the processes the produce them, and the connections between the files and the processes. This model requires traversing the mathematical graph created by the network of processes and files. The second model is better described as a workflow that modifies the data by fine- grained transactions. In this case, provenance tracking is equivalent to tracking the history of transactions created by the workflow. In the large scale production paradigm, the rates of data ingest and the number of processes and files is sufficiently large that production needs to be automated. For example, in the upcoming NPOESS Preparatory Project (NPP), a typical time granularity for ingested data files is about 86 seconds. A single spectral channel from the VIIRS instrument on this satellite produces about 1000 files per day of calibrated data. Given the large number of channels on this instrument, production must be highly automated. An archive must be prepared to catalog millions of files per year. In this situation, data producers operate by creating source code that the production system compiles and links into executable objects. The executable code is often unchanged over many instances, so that production is very homogeneous over extended periods of time. This fact means that versioning of data products is also quite discrete and leads naturally to a hierarchical inventory structure. In the small scale production paradigm, the number of files is

  19. Implementation of Anaphylaxis Management Guidelines: A Register-Based Study

    PubMed Central

    Grabenhenrich, Linus; Hompes, Stephanie; Gough, Hannah; Ruëff, Franziska; Scherer, Kathrin; Pföhler, Claudia; Treudler, Regina; Mahler, Vera; Hawranek, Thomas; Nemat, Katja; Koehli, Alice; Keil, Thomas; Worm, Margitta

    2012-01-01

    Background Anaphylaxis management guidelines recommend the use of intramuscular adrenaline in severe reactions, complemented by antihistamines and corticoids; secondary prevention includes allergen avoidance and provision of self-applicable first aid drugs. Gaps between recommendations and their implementation have been reported, but only in confined settings. Hence, we analysed nation-wide data on the management of anaphylaxis, evaluating the implementation of guidelines. Methods Within the anaphylaxis registry, allergy referral centres across Germany, Austria and Switzerland provided data on severe anaphylaxis cases. Based on patient records, details on reaction circumstances, diagnostic workup and treatment were collected via online questionnaire. Report of anaphylaxis through emergency physicians allowed for validation of registry data. Results 2114 severe anaphylaxis patients from 58 centres were included. 8% received adrenaline intravenously, 4% intramuscularly; 50% antihistamines, and 51% corticoids. Validation data indicated moderate underreporting of first aid drugs in the Registry. 20% received specific instructions at the time of the reaction; 81% were provided with prophylactic first aid drugs at any time. Conclusion There is a distinct discrepancy between current anaphylaxis management guidelines and their implementation. To improve patient care, a revised approach for medical education and training on the management of severe anaphylaxis is warranted. PMID:22590513

  20. Anesthesia information management system implementation: a practical guide.

    PubMed

    Muravchick, Stanley; Caldwell, James E; Epstein, Richard H; Galati, Maria; Levy, Warren J; O'Reilly, Michael; Plagenhoef, Jeffrey S; Rehman, Mohamed; Reich, David L; Vigoda, Michael M

    2008-11-01

    Anesthesia Information Management Systems (AIMS) display and archive perioperative physiological data and patient information. Although currently in limited use, the potential benefits of an AIMS with regard to enhancement of patient safety, clinical effectiveness and quality improvement, charge capture and professional fee billing, regulatory compliance, and anesthesia outcomes research are great. The processes and precautions appropriate for AIMS selection, installation, and implementation are complex, however, and have been learned at each site by trial and error. This collaborative effort summarizes essential considerations for successful AIMS implementation, including product evaluation, assessment of information technology needs, resource availability, leadership roles, and training. PMID:18931218

  1. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  2. Implementation of spatial smart waste management system in malaysia

    NASA Astrophysics Data System (ADS)

    Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Wahap, N. A.; Ismail, N. M.; Ahmad, N.

    2016-06-01

    One of the challenges to innovate and create an IoT -enabled solution is in monitoring and management of the environment. Waste collection utilizing the Internet of Things (IoT) with the technology of smart wireless sensors will able to gather fill-level data from waste containers hence providing a waste monitoring solution that brings up savings in waste collection costs. One of the challenges to the local authority is how to monitor the works of contractor effective and efficiently in waste management. This paper will propose to the local authority the implementation of smart waste management in Malaysia to improve the city management and to provide better services to the public towards smart city applications.

  3. A knowledge management methodology for the integrated assessment of WWTP configurations during conceptual design.

    PubMed

    Garrido-Baserba, M; Reif, R; Rodriguez-Roda, I; Poch, M

    2012-01-01

    The current complexity involved in wastewater management projects is arising as the XXI century sets new challenges leading towards a more integrated plant design. In this context, the growing number of innovative technologies, stricter legislation and the development of new methodological approaches make it difficult to design appropriate flow schemes for new wastewater projects. Thus, new tools are needed for the wastewater treatment plant (WWTP) conceptual design using integrated assessment methods in order to include different types of objectives at the same time i.e. environmental, economical, technical, and legal. Previous experiences used the decision support system (DSS) methodology to handle the specific issues related to wastewater management, for example, the design of treatment facilities for small communities. However, tools developed for addressing the whole treatment process independently of the plant size, capable of integrating knowledge from many different areas, including both conventional and innovative technologies are not available. Therefore, the aim of this paper is to present and describe an innovative knowledge-based methodology that handles the conceptual design of WWTP process flow-diagrams (PFDs), satisfying a vast number of different criteria. This global approach is based on a hierarchy of decisions that uses the information contained in knowledge bases (KBs) with the aim of automating the generation of suitable WWTP configurations for a specific scenario. Expert interviews, legislation, specialized literature and engineering experience have been integrated within the different KBs, which indeed constitute one of the main highlights of this work. Therefore, the methodology is presented as a valuable tool which provides customized PFD for each specific case, taking into account process unit interactions and the user specified requirements and objectives.

  4. A knowledge management methodology for the integrated assessment of WWTP configurations during conceptual design.

    PubMed

    Garrido-Baserba, M; Reif, R; Rodriguez-Roda, I; Poch, M

    2012-01-01

    The current complexity involved in wastewater management projects is arising as the XXI century sets new challenges leading towards a more integrated plant design. In this context, the growing number of innovative technologies, stricter legislation and the development of new methodological approaches make it difficult to design appropriate flow schemes for new wastewater projects. Thus, new tools are needed for the wastewater treatment plant (WWTP) conceptual design using integrated assessment methods in order to include different types of objectives at the same time i.e. environmental, economical, technical, and legal. Previous experiences used the decision support system (DSS) methodology to handle the specific issues related to wastewater management, for example, the design of treatment facilities for small communities. However, tools developed for addressing the whole treatment process independently of the plant size, capable of integrating knowledge from many different areas, including both conventional and innovative technologies are not available. Therefore, the aim of this paper is to present and describe an innovative knowledge-based methodology that handles the conceptual design of WWTP process flow-diagrams (PFDs), satisfying a vast number of different criteria. This global approach is based on a hierarchy of decisions that uses the information contained in knowledge bases (KBs) with the aim of automating the generation of suitable WWTP configurations for a specific scenario. Expert interviews, legislation, specialized literature and engineering experience have been integrated within the different KBs, which indeed constitute one of the main highlights of this work. Therefore, the methodology is presented as a valuable tool which provides customized PFD for each specific case, taking into account process unit interactions and the user specified requirements and objectives. PMID:22678214

  5. CAVEMAN: Configuration And VErsion MANagement. User`s guide, v2.1.2

    SciTech Connect

    Dyer, K.M.

    1993-03-12

    The mission of the CAVEMAN project is to provide the tools for large code systems so that those who work on them can perform source control and configuration control on UNIX-based file servers, rather than the LC Crays. An outside product called cvs has been chosen as the underlying source control system. The initials stand for {open_quotes}Concurrent Versions System{close_quotes}. It is a freeware program that runs on most UNIX stations. To quote from the cvs man page: {open_quotes}cvs is a front end to the rcs revision control system which extends the notion of revision control from a collection of files in a single directory to a hierarchical collection of directories consisting of revision controlled files. These directories and files can be combined together to form a software release. cvs provides the functions necessary to manage these software releases and to control the concurrent editing of source files among multiple software developers.{close_quotes} While cvs may be run directly, there are several tasks in the LLNL environment that it seemed either safer or easier to automate. CAVEMAN provides the needed functionality, generally in the form of wrappers to cvs.

  6. Implementation uncertainty when using recreational hunting to manage carnivores

    PubMed Central

    Bischof, Richard; Nilsen, Erlend B; Brøseth, Henrik; Männil, Peep; Ozoliņš, Jaānis; Linnell, John D C; Bode, Michael

    2012-01-01

    1. Wildlife managers often rely on resource users, such as recreational or commercial hunters, to achieve management goals. The use of hunters to control wildlife populations is especially common for predators and ungulates, but managers cannot assume that hunters will always fill annual quotas set by the authorities. It has been advocated that resource management models should account for uncertainty in how harvest rules are realized, requiring that this implementation uncertainty be estimated. 2. We used a survival analysis framework and long-term harvest data from large carnivore management systems in three countries (Estonia, Latvia and Norway) involving four species (brown bear, grey wolf, Eurasian lynx and wolverine) to estimate the performance of hunters with respect to harvest goals set by managers. 3. Variation in hunter quota-filling performance was substantial, ranging from 40% for wolverine in Norway to nearly 100% for lynx in Latvia. Seasonal and regional variation was also high within country–species pairs. We detected a positive relationship between the instantaneous potential to fill a quota slot and the relative availability of the target species for both wolverine and lynx in Norway. 4. Survivor curves and hazards – with survival time measured as the time from the start of a season until a quota slot is filled – can indicate the extent to which managers can influence harvest through adjustments of season duration and quota limits. 5. Synthesis and applications. We investigated seven systems where authorities use recreational hunting to manage large carnivore populations. The variation and magnitude of deviation from harvest goals was substantial, underlining the need to incorporate implementation uncertainty into resource management models and decisions-making. We illustrate how survival analysis can be used by managers to estimate the performance of resource users with respect to achieving harvest goals set by managers. The findings in this

  7. Development and implementation of a business continuity management risk index.

    PubMed

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels. PMID:26591931

  8. Development and implementation of a business continuity management risk index.

    PubMed

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.

  9. Freescale Semiconductor Successfully Implements an Energy Management System

    SciTech Connect

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  10. On-the-fly form generation and on-line metadata configuration--a clinical data management Web infrastructure in Java.

    PubMed

    Beck, Peter; Truskaller, Thomas; Rakovac, Ivo; Cadonna, Bruno; Pieber, Thomas R

    2006-01-01

    In this paper we describe the approach to build a web-based clinical data management infrastructure on top of an entity-attribute-value (EAV) database which provides for flexible definition and extension of clinical data sets as well as efficient data handling and high performance query execution. A "mixed" EAV implementation provides a flexible and configurable data repository and at the same time utilizes the performance advantages of conventional database tables for rarely changing data structures. A dynamically configurable data dictionary contains further information for data validation. The online user interface can also be assembled dynamically. A data transfer object which encapsulates data together with all required metadata is populated by the backend and directly used to dynamically render frontend forms and handle incoming data. The "mixed" EAV model enables flexible definition and modification of clinical data sets while reducing performance drawbacks of pure EAV implementations to a minimum. The system currently is in use in an electronic patient record with focus on flexibility and a quality management application (www.healthgate.at) with high performance requirements.

  11. Group visits for chronic illness management: implementation challenges and recommendations.

    PubMed

    Jones, Katherine R; Kaewluang, Napatsawan; Lekhak, Nirmala

    2014-01-01

    The group visit approach to improve chronic illness self-management appears promising in terms of selected outcomes, but little information is available about best ways to organize and implement group visits. This literature review of 84 articles identified group visit implementation challenges, including lack of a group visit billing code, inadequate administrative support and resources, difficult participant recruitment and retention, and logistical issues such as space and scheduling. Recommendations for future implementation initiatives were also abstracted from the literature. Patients and providers can benefit from well-planned and well-conducted group visits. These benefits include greater patient and provider satisfaction, reduced overall utilization, improved clinical outcomes, and greater provider efficiency and productivity.

  12. Implementation of Hepatitis Information Management System in Iran

    PubMed Central

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2016-01-01

    Introduction: Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. Methodology: This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design’s stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Findings: Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Conclusion: Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients’ conditions. That mentioned system paves the way for the analysis of gathered information

  13. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  14. A digital toolkit to implement and manage a multisite study.

    PubMed

    Lasater, Kathie; Johnson, Elizabeth; Hodson-Carlton, Kay; Siktberg, Linda; Sideras, Stephanie

    2012-03-01

    Calls for multisite studies are increasing in nursing education. However, the challenge of implementing consistent protocols and maintaining rigorous standards across sites can be daunting. One purpose of a recent multisite, collaborative, simulation study was to evaluate a digital toolkit's effectiveness for managing a multisite study. We describe the digital toolkit composed of Web-based technologies used to manage a study involving five sites including one United Kingdom site. The digital toolkit included a wiki, a project Web site to coordinate the protocols and study materials, software to organize study materials, and a secure location for sharing data. Most of these are familiar tools; however, combined as a toolkit, they became a useful management system. Web-based communication strategies and coordinated technical support served as key adjuncts to foster collaboration. This article also offers practical implications and recommendations for using a digital toolkit in other multisite studies.

  15. Configuration Management and Infrastructure Monitoring Using CFEngine and Icinga for Real-time Heterogeneous Data Taking Environment

    NASA Astrophysics Data System (ADS)

    Poat, M. D.; Lauret, J.; Betts, W.

    2015-12-01

    The STAR online computing environment is an intensive ever-growing system used for real-time data collection and analysis. Composed of heterogeneous and sometimes groups of custom-tuned machines, the computing infrastructure was previously managed by manual configurations and inconsistently monitored by a combination of tools. This situation led to configuration inconsistency and an overload of repetitive tasks along with lackluster communication between personnel and machines. Globally securing this heterogeneous cyberinfrastructure was tedious at best and an agile, policy-driven system ensuring consistency, was pursued. Three configuration management tools, Chef, Puppet, and CFEngine have been compared in reliability, versatility and performance along with a comparison of infrastructure monitoring tools Nagios and Icinga. STAR has selected the CFEngine configuration management tool and the Icinga infrastructure monitoring system leading to a versatile and sustainable solution. By leveraging these two tools STAR can now swiftly upgrade and modify the environment to its needs with ease as well as promptly react to cyber-security requests. By creating a sustainable long term monitoring solution, the detection of failures was reduced from days to minutes, allowing rapid actions before the issues become dire problems, potentially causing loss of precious experimental data or uptime.

  16. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    PubMed

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches).

  17. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    PubMed

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches). PMID:23483997

  18. Configuration and Specifications of an Unmanned Aerial Vehicle (UAV) for Early Site Specific Weed Management

    PubMed Central

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches). PMID:23483997

  19. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.; Bizier, P.; DeBarry, P.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  20. System configuration management plan for the TWRS controlled baseline database system [TCBD

    SciTech Connect

    Spencer, S.G.

    1998-09-23

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project`s requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user`s requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  1. Integrated System Health Management: Foundational Concepts, Approach, and Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando

    2009-01-01

    A sound basis to guide the community in the conception and implementation of ISHM (Integrated System Health Management) capability in operational systems was provided. The concept of "ISHM Model of a System" and a related architecture defined as a unique Data, Information, and Knowledge (DIaK) architecture were described. The ISHM architecture is independent of the typical system architecture, which is based on grouping physical elements that are assembled to make up a subsystem, and subsystems combine to form systems, etc. It was emphasized that ISHM capability needs to be implemented first at a low functional capability level (FCL), or limited ability to detect anomalies, diagnose, determine consequences, etc. As algorithms and tools to augment or improve the FCL are identified, they should be incorporated into the system. This means that the architecture, DIaK management, and software, must be modular and standards-based, in order to enable systematic augmentation of FCL (no ad-hoc modifications). A set of technologies (and tools) needed to implement ISHM were described. One essential tool is a software environment to create the ISHM Model. The software environment encapsulates DIaK, and an infrastructure to focus DIaK on determining health (detect anomalies, determine causes, determine effects, and provide integrated awareness of the system to the operator). The environment includes gateways to communicate in accordance to standards, specially the IEEE 1451.1 Standard for Smart Sensors and Actuators.

  2. Detection and management of a complex canal configuration in mesiobuccal root of maxillary first molar using three dimensional imaging

    PubMed Central

    Deepa, Velagala L.; Bollu, Indira Priyadharsini; Dhamaraju, Bhargavi; Yadla, Padmasri

    2016-01-01

    This case report discusses the identification and management of complex canal configuration of 3-2-1 in the mesiobuccal (MB) root of the maxillary left first molar. Careful attention to details of the pulpal floor and applying the knowledge of the laws of orifice location along with deepening the subpulpal groove with ultrasonic tips helped in identifying the three MB canals. Manual scouting helped in understanding the anatomic configuration; the use of three-dimensional imaging technique and spiral computed tomography (SCT) confirmed the same. SCT images showed buccolingually wide and bulbous mesiobuccal root with three separate canals at coronal third that merged into two canals in the middle and exited as a single canal at the apex. This article highlights the role of SCT in three-dimensionally analyzing the unseen rarest canal configurations that ultimately enabled the clinician to thoroughly explore, debride, and obturate the entire root canal system. PMID:27195233

  3. Attitude control/momentum management of the Space Station Freedom for large angle torque-equilibrium-attitude configurations

    NASA Technical Reports Server (NTRS)

    Parlos, Alexander G.; Sunkel, John W.

    1990-01-01

    An attitude-control and momentum-management (ACMM) system for the Space Station in a large-angle torque-equilibrium-attitude (TEA) configuration is developed analytically and demonstrated by means of numerical simulations. The equations of motion for a rigid-body Space Station model are outlined; linearized equations for an arbitrary TEA (resulting from misalignment of control and body axes) are derived; the general requirements for an ACMM are summarized; and a pole-placement linear-quadratic regulator solution based on scheduled gains is proposed. Results are presented in graphs for (1) simulations based on configuration MB3 (showing the importance of accounting for the cross-inertia terms in the TEA estimate) and (2) simulations of a stepwise change from configuration MB3 to the 'assembly complete' stage over 130 orbits (indicating that the present ACCM scheme maintains sufficient control over slowly varying Space Station dynamics).

  4. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  5. Quantitative option analysis for implementation and management of landfills.

    PubMed

    Kerestecioğlu, Merih

    2016-09-01

    The selection of the most feasible strategy for implementation of landfills is a challenging step. Potential implementation options of landfills cover a wide range, from conventional construction contracts to the concessions. Montenegro, seeking to improve the efficiency of the public services while maintaining affordability, was considering privatisation as a way to reduce public spending on service provision. In this study, to determine the most feasible model for construction and operation of a regional landfill, a quantitative risk analysis was implemented with four steps: (i) development of a global risk matrix; (ii) assignment of qualitative probabilities of occurrences and magnitude of impacts; (iii) determination of the risks to be mitigated, monitored, controlled or ignored; (iv) reduction of the main risk elements; and (v) incorporation of quantitative estimates of probability of occurrence and expected impact for each risk element in the reduced risk matrix. The evaluated scenarios were: (i) construction and operation of the regional landfill by the public sector; (ii) construction and operation of the landfill by private sector and transfer of the ownership to the public sector after a pre-defined period; and (iii) operation of the landfill by the private sector, without ownership. The quantitative risk assessment concluded that introduction of a public private partnership is not the most feasible option, unlike the common belief in several public institutions in developing countries. A management contract for the first years of operation was advised to be implemented, after which, a long term operating contract may follow. PMID:27354014

  6. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  7. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  11. Improving the effectiveness of health care innovation implementation: middle managers as change agents.

    PubMed

    Birken, Sarah A; Lee, Shoou-Yih Daniel; Weiner, Bryan J; Chin, Marshall H; Schaefer, Cynthia T

    2013-02-01

    The rate of successful health care innovation implementation is dismal. Middle managers have a potentially important yet poorly understood role in health care innovation implementation. This study used self-administered surveys and interviews of middle managers in health centers that implemented an innovation to reduce health disparities to address the questions: Does middle managers' commitment to health care innovation implementation influence implementation effectiveness? If so, in what ways does their commitment influence implementation effectiveness? Although quantitative survey data analysis results suggest a weak relationship, qualitative interview data analysis results indicate that middle managers' commitment influences implementation effectiveness when middle managers are proactive. Scholars should account for middle managers' influence in implementation research, and health care executives may promote implementation effectiveness by hiring proactive middle managers and creating climates in which proactivity is rewarded, supported, and expected.

  12. Implementing Model-Check for Employee and Management Satisfaction

    NASA Technical Reports Server (NTRS)

    Jones, Corey; LaPha, Steven

    2013-01-01

    This presentation will discuss methods to which ModelCheck can be implemented to not only improve model quality, but also satisfy both employees and management through different sets of quality checks. This approach allows a standard set of modeling practices to be upheld throughout a company, with minimal interaction required by the end user. The presenter will demonstrate how to create multiple ModelCheck standards, preventing users from evading the system, and how it can improve the quality of drawings and models.

  13. Tiltrotor noise reduction through flight trajectory management and aircraft configuration control

    NASA Astrophysics Data System (ADS)

    Gervais, Marc

    A tiltrotor can hover, takeoff and land vertically as well as cruise at high speeds and fly long distances. Because of these unique capabilities, tiltrotors are envisioned as an aircraft that could provide a solution to the issue of airport gridlock by operating on stub runways, helipads, or from smaller regional airports. However, during an approach-to-land a tiltrotor is susceptible to radiating strong impulsive noise, in particular, Blade-Vortex Interaction noise (BVI), a phenomenon highly dependent on the vehicle's performance-state. A mathematical model was developed to predict the quasi-static performance characteristics of a tiltrotor during a converting approach in the longitudinal plane. Additionally, a neural network was designed to model the acoustic results from a flight test of the XV-15 tiltrotor as a function of the aircraft's performance parameters. The performance model was linked to the neural network to yield a combined performance/acoustic model that is capable of predicting tiltrotor noise emitted during a decelerating approach. The model was then used to study noise trends associated with different combinations of airspeed, nacelle tilt, and flight path angle. It showed that BVI noise is the dominant noise source during a descent and that its strength increases with steeper descent angles. Strong BVI noise was observed at very steep flight path angles, suggesting that the tiltrotor's high downwash prevents the wake from being pushed above the rotor, even at such steep descent angles. The model was used to study the effects of various aircraft configuration and flight trajectory parameters on the rotor inflow, which adequately captured the measured BVI noise trends. Flight path management effectively constrained the rotor inflow during a converting approach and thus limited the strength of BVI noise. The maximum deceleration was also constrained by controlling the nacelle tilt-rate during conversion. By applying these constraints, low BVI noise

  14. Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

    NASA Technical Reports Server (NTRS)

    Latorella, Kara A.

    2015-01-01

    Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to

  15. QbD implementation and Post Approval Lifecycle Management (PALM).

    PubMed

    Ohage, Ettore; Iverson, Raquel; Krummen, Lynne; Taticek, Ron; Vega, Maria

    2016-09-01

    Quality by design (QbD) is a global regulatory initiative with the goal of enhancing pharmaceutical development through the proactive design of pharmaceutical manufacturing process and controls to consistently deliver the intended performance of the product. The principles of pharmaceutical development relevant to QbD are described in the ICH guidance documents (ICHQ8-11) [1-3]. An integrated set of risk assessments and their related elements developed at Roche/Genentech were designed to provide an overview of product and process knowledge for the production of a recombinant monoclonal antibody. This chapter describes concepts for implementing the control strategy for a monoclonal antibody including a Design Space for routine commercial manufacturing, and the Post Approval Lifecycle Management (PALM) plan that is used to manage any remaining risks during the commercial lifecycle. The PALM plan is part of the submitted dossier in the regional section and serves as a regulatory agreement between the manufacturer and the health authority specifying how process and product attributes are monitored to ensure both remain within a controlled state post-approval, process parameter changes are managed within the design space, and the control system is updated as necessary based on further process and product knowledge.

  16. QbD implementation and Post Approval Lifecycle Management (PALM).

    PubMed

    Ohage, Ettore; Iverson, Raquel; Krummen, Lynne; Taticek, Ron; Vega, Maria

    2016-09-01

    Quality by design (QbD) is a global regulatory initiative with the goal of enhancing pharmaceutical development through the proactive design of pharmaceutical manufacturing process and controls to consistently deliver the intended performance of the product. The principles of pharmaceutical development relevant to QbD are described in the ICH guidance documents (ICHQ8-11) [1-3]. An integrated set of risk assessments and their related elements developed at Roche/Genentech were designed to provide an overview of product and process knowledge for the production of a recombinant monoclonal antibody. This chapter describes concepts for implementing the control strategy for a monoclonal antibody including a Design Space for routine commercial manufacturing, and the Post Approval Lifecycle Management (PALM) plan that is used to manage any remaining risks during the commercial lifecycle. The PALM plan is part of the submitted dossier in the regional section and serves as a regulatory agreement between the manufacturer and the health authority specifying how process and product attributes are monitored to ensure both remain within a controlled state post-approval, process parameter changes are managed within the design space, and the control system is updated as necessary based on further process and product knowledge. PMID:27449920

  17. The HSE management system in practice-implementation

    SciTech Connect

    Primrose, M.J.; Bentley, P.D.; Sykes, R.M.

    1996-11-01

    This paper sets out the necessary strategic issues that must be dealt with when setting up a management system for HSE. It touches on the setting of objectives using a form of risk matrix and the establishment of corporate risk tolerability levels. Such issue management is vital but can be seen as yet another corporate HQ initiative. It must therefore be linked, and made relevant to those in middle management tasked with implementing the system and also to those at risk {open_quote}at the sharp end{close_quote} of the business. Setting acceptance criteria is aimed at demonstrating a necessary and sufficient level of control or coverage for those hazards considered as being within the objective setting of the Safety or HSE Case. Critical risk areas addressed via the Safety Case, within Shell companies at least, must show how this coverage is extended to critical health and environmental issues. Methods of achieving this are various ranging from specific Case deliverables (like the Hazard Register and Accountability Matrices) through to the incorporation of topics from the hazard analysis in toolbox talks and meetings. Risk analysis techniques are increasingly seen as complementary rather than separate with environmental assessments, health risk assessment sand safety risk analyses taking place together and results being considered jointly. The paper ends with some views on the way ahead regarding the linking of risk decisions to target setting at the workplace and views on how Case information may be retrieved and used on a daily basis.

  18. Model for Prioritizing Best Management Practice Implementation: Sediment Load Reduction

    NASA Astrophysics Data System (ADS)

    Jang, Taeil; Vellidis, George; Hyman, Jeffrey B.; Brooks, Erin; Kurkalova, Lyubov A.; Boll, Jan; Cho, Jaepil

    2013-01-01

    Understanding the best way to allocate limited resources is a constant challenge for water quality improvement efforts. The synoptic approach is a tool for geographic prioritization of these efforts. It uses a benefit-cost framework to calculate indices for functional criteria in subunits (watersheds, counties) of a region and then rank the subunits. The synoptic approach was specifically designed to incorporate best professional judgment in cases where information and resources are limited. To date, the synoptic approach has been applied primarily to local or regional wetland restoration prioritization projects. The goal of this work was to develop a synoptic model for prioritizing watersheds within which suites of agricultural best management practices (BMPs) can be implemented to reduce sediment load at the watershed outlets. The model ranks candidate watersheds within an ecoregion or river basin so that BMP implementation within the highest ranked watersheds will result in the most sediment load reduction per conservation dollar invested. The model can be applied anywhere and at many scales provided that the selected suite of BMPs is appropriate for the evaluation area's biophysical and climatic conditions. The model was specifically developed as a tool for prioritizing BMP implementation efforts in ecoregions containing watersheds associated with the USDA-NRCS conservation effects assessment project (CEAP). This paper presents the testing of the model in the little river experimental watershed (LREW) which is located near Tifton, Georgia, USA and is the CEAP watershed representing the southeastern coastal plain. The application of the model to the LREW demonstrated that the model represents the physical drivers of erosion and sediment loading well. The application also showed that the model is quite responsive to social and economic drivers and is, therefore, best applied at a scale large enough to ensure differences in social and economic drivers across the

  19. E-Resources Management: How We Positioned Our Organization to Implement an Electronic Resources Management System

    ERIC Educational Resources Information Center

    White, Marilyn; Sanders, Susan

    2009-01-01

    The Information Services Division (ISD) of the National Institute of Standards and Technology (NIST) positioned itself to successfully implement an electronic resources management system. This article highlights the ISD's unique ability to "team" across the organization to realize a common goal, develop leadership qualities in support of…

  20. NASE 2015: Implementation of a Management Quality System

    NASA Astrophysics Data System (ADS)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  1. Graphical User Interface Development and Design to Support Airport Runway Configuration Management

    NASA Technical Reports Server (NTRS)

    Jones, Debra G.; Lenox, Michelle; Onal, Emrah; Latorella, Kara A.; Lohr, Gary W.; Le Vie, Lisa

    2015-01-01

    The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

  2. Implementing agricultural phosphorus science and management to combat eutrophication.

    PubMed

    Kleinman, Peter J A; Sharpley, Andrew N; Withers, Paul J A; Bergström, Lars; Johnson, Laura T; Doody, Donnacha G

    2015-03-01

    Experience with implementing agricultural phosphorus (P) strategies highlights successes and uncertainty over outcomes. We examine case studies from the USA, UK, and Sweden under a gradient of voluntary, litigated, and regulatory settings. In the USA, voluntary strategies are complicated by competing objectives between soil conservation and dissolved P mitigation. In litigated watersheds, mandated manure export has not wrought dire consequences on poultry farms, but has adversely affected beef producers who fertilize pastures with manure. In the UK, regulatory and voluntary approaches are improving farmer awareness, but require a comprehensive consideration of P management options to achieve downstream reductions. In Sweden, widespread subsidies sometime hinder serious assessment of program effectiveness. In all cases, absence of local data can undermine recommendations from models and outside experts. Effective action requires iterative application of existing knowledge of P fate and transport, coupled with unabashed description and demonstration of tradeoffs to local stakeholders.

  3. STARDUST: implementing a new manage-to-budget paradigm

    NASA Astrophysics Data System (ADS)

    Atkins, Kenneth L.; Martin, Bredt D.; Vellinga, Joseph M.; Price, Rick A.

    2003-01-01

    the leveraging goal by serving two projects, STARDUST and Mars Surveyor '98. It avoided duplicate project-unique personnel structures and offered cost benefits to each project. This paper provides details and example metrics characterizing the aggressive application of the design-to-cost paradigm and implementation by the STARDUST management team to achieve success under the Discovery Program budget constraints.

  4. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    SciTech Connect

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  5. IPM: Integrated Pest Management Kit for Building Managers. How To Implement an Integrated Pest Management Program in Your Building(s).

    ERIC Educational Resources Information Center

    Mitchell, Brad

    This management kit introduces building managers to the concept of Integrated Pest Management (IPM), and provides the knowledge and tools needed to implement an IPM program in their buildings. It discusses the barriers to implementing an IPM program, why such a program should be used, and the general guidelines for its implementation. Managerial…

  6. The Implementation of Policies Regulating Institutional Data Management

    NASA Astrophysics Data System (ADS)

    Gebauer, Petra; Kirchner, Ingo; Hirt, Mirjam

    2013-04-01

    Data management in geosciences, especially at university and other research institutes commonly isn't very well coordinated. Due to changing staff and limited funding this topic has no priority in general. The process to implement policies regulating data management in an university institute is complex. First of all existing structures and workflows had to be reviewed. That means an inventory of different data sets, reviewing quality tests, but also data requirements of scientists as well as their willingness to follow rules simplifying their work. Awareness of complying with regulations is essential for the acceptance of policies. A leading team, formed by several scientists, will bring together different points of view to control the development of institutional policies. Determining the actual state of personal data management using a questionary was one of the activities in the project EWIG (Developing workflow components for long-term archiving of research data in geosciences). The intention of the project is to support geoscientists in transferring their data in a standardized way for storage in digital long-term archives and in using documented data from these archives. Project partners are Deutsches GeoForschungsZentrum Potsdam and Konrad-Zuse-Zentrum für Informationstechnik Berlin. Other activities were to discuss existing problems and approved solutions with many institutions and tried to find out, where are the gaps in already realized workflows and which structures could be an ideal model to be generalized. Policies for the workflow independent from the working area will be defined. University lectures were started to teach future scientific generations from the beginning on how to deal with all sorts of different data in a transparent way. Their feedback will be used to improve data documentations and data curation, so that the re-use of archived research data will be encouraged. The whole process of different approaches in the project EWIG, funded

  7. Systems Modeling to Implement Integrated System Health Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Jorge F.; Walker, Mark; Morris, Jonathan; Smith, Harvey; Schmalzel, John

    2007-01-01

    ISHM capability includes: detection of anomalies, diagnosis of causes of anomalies, prediction of future anomalies, and user interfaces that enable integrated awareness (past, present, and future) by users. This is achieved by focused management of data, information and knowledge (DIaK) that will likely be distributed across networks. Management of DIaK implies storage, sharing (timely availability), maintaining, evolving, and processing. Processing of DIaK encapsulates strategies, methodologies, algorithms, etc. focused on achieving high ISHM Functional Capability Level (FCL). High FCL means a high degree of success in detecting anomalies, diagnosing causes, predicting future anomalies, and enabling health integrated awareness by the user. A model that enables ISHM capability, and hence, DIaK management, is denominated the ISHM Model of the System (IMS). We describe aspects of the IMS that focus on processing of DIaK. Strategies, methodologies, and algorithms require proper context. We describe an approach to define and use contexts, implementation in an object-oriented software environment (G2), and validation using actual test data from a methane thruster test program at NASA SSC. Context is linked to existence of relationships among elements of a system. For example, the context to use a strategy to detect leak is to identify closed subsystems (e.g. bounded by closed valves and by tanks) that include pressure sensors, and check if the pressure is changing. We call these subsystems Pressurizable Subsystems. If pressure changes are detected, then all members of the closed subsystem become suspect of leakage. In this case, the context is defined by identifying a subsystem that is suitable for applying a strategy. Contexts are defined in many ways. Often, a context is defined by relationships of function (e.g. liquid flow, maintaining pressure, etc.), form (e.g. part of the same component, connected to other components, etc.), or space (e.g. physically close

  8. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    ERIC Educational Resources Information Center

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into integrated rather than separate…

  9. IBFAN Africa training initiatives: code implementation and lactation management.

    PubMed

    Mbuli, A

    1994-01-01

    As part of an ongoing effort to halt the decline of breast feeding rates in Africa, 35 representatives of 12 different African countries met in Mangochi, Malawi, in February 1994. The Code of Marketing of Breastmilk Substitutes was scrutinized. National codes were drafted based on the "Model Law" of the IBFAN Code Documentation Centre (ICDC), Penang. Mechanisms of implementation, specific to each country, were developed. Strategies for the promotion, protection, and support of breast feeding, which is very important to child survival in Africa, were discussed. The training course was organized by ICDC, in conjunction with IBFAN Africa, and with the support of the United Nations Children's Fund (UNICEF) and the World Health Organization (WHO). Countries in eastern, central, and southern Africa were invited to send participants, who included professors, pediatricians, nutritionists, MCH personnel, nurses, and lawyers. IBFAN Africa has also been conducting lactation management workshops for a number of years in African countries. 26 health personnel (pediatricians, nutritionists, senior nursing personnel, and MCH workers), representing 7 countries in the southern African region, attended a training of trainers lactation management workshop in Swaziland in August, 1993 with the support of their UNICEF country offices. The workshop included lectures, working sessions, discussions, and slide and video presentations. Topics covered included national nutrition statuses, the importance of breast feeding, the anatomy and physiology of breast feeding, breast feeding problems, the International Code of Marketing, counseling skills, and training methods. The field trip to a training course covering primary health care that was run by the Traditional Healers Organization (THO) in Swaziland was of particular interest because of the strong traditional medicine sector in many African countries. IBFAN Africa encourages use of community workers (traditional healers, Rural Health

  10. Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)

    SciTech Connect

    Cooper, W.E.

    2000-09-29

    Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

  11. Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

    NASA Astrophysics Data System (ADS)

    Wan, Jiangping; Jones, James D.

    2013-11-01

    The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.

  12. Implementation of an Anesthesia Information Management System (AIMS).

    PubMed

    Douglas, James R; Ritter, Melody J

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care-related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges. PMID:21734847

  13. Implementation of an Anesthesia Information Management System (AIMS).

    PubMed

    Douglas, James R; Ritter, Melody J

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care-related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges.

  14. Implementation of an Anesthesia Information Management System (AIMS)

    PubMed Central

    Douglas, James R.; Ritter, Melody J.

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care–related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges. PMID:21734847

  15. Behavior-based network management: a unique model-based approach to implementing cyber superiority

    NASA Astrophysics Data System (ADS)

    Seng, Jocelyn M.

    2016-05-01

    Behavior-Based Network Management (BBNM) is a technological and strategic approach to mastering the identification and assessment of network behavior, whether human-driven or machine-generated. Recognizing that all five U.S. Air Force (USAF) mission areas rely on the cyber domain to support, enhance and execute their tasks, BBNM is designed to elevate awareness and improve the ability to better understand the degree of reliance placed upon a digital capability and the operational risk.2 Thus, the objective of BBNM is to provide a holistic view of the digital battle space to better assess the effects of security, monitoring, provisioning, utilization management, allocation to support mission sustainment and change control. Leveraging advances in conceptual modeling made possible by a novel advancement in software design and implementation known as Vector Relational Data Modeling (VRDM™), the BBNM approach entails creating a network simulation in which meaning can be inferred and used to manage network behavior according to policy, such as quickly detecting and countering malicious behavior. Initial research configurations have yielded executable BBNM models as combinations of conceptualized behavior within a network management simulation that includes only concepts of threats and definitions of "good" behavior. A proof of concept assessment called "Lab Rat," was designed to demonstrate the simplicity of network modeling and the ability to perform adaptation. The model was tested on real world threat data and demonstrated adaptive and inferential learning behavior. Preliminary results indicate this is a viable approach towards achieving cyber superiority in today's volatile, uncertain, complex and ambiguous (VUCA) environment.

  16. Energy management of electric and hybrid vehicles dependent on powertrain configuration

    NASA Astrophysics Data System (ADS)

    Varga, Bogdan Ovidiu

    2012-06-01

    Electric and hybrid vehicles are going to become the most reliable source of transport for future years. The CO2 and NOx targets in Euro 6 normative puts the producers of vehicles in a dilemma, whether to adapt the internal combustion engines further, or to develop hybrid or electric power trains that are going to reach the pollution limit of the future norms or to go below that. Before acting a well-developed strategy in determining the optimum power flow has to be developed by producers; CRUISE software is a tool with the unique and special characteristics to determine the optimum in this highly important area. Whether electric vehicle, electric vehicle with range extender or a hybrid with CVT or planetary gearbox, the complexity of the mathematical modules remains the same, giving the developer the possibility to create complex functions and distinctive characteristics for each component of the vehicle. With such a powerful tool it becomes extremely easy to evaluate the energy flow in all directions, from electric machine to the battery, from electric machine to the power generator, and from the electric machine to the internal combustion engine. Applying to the (Electric Vehicle, Electric Vehicle with Range Extender, Hybrid vehicle with CVT, Hybrid vehicle with planetary gear set) the ECE-15 in a virtual environment (urban driving cycle) the simulation results show a different usage, rate of storage and efficiency concerning the energy, this being dependent of the power train configuration in most part.

  17. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Management District and San Joaquin Valley Unified Air Pollution Control District AGENCY: Environmental... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These...

  18. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  19. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  20. Succession planning for RNs: implementing a nurse management internship.

    PubMed

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  1. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What records management... ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What records management principles must agencies implement? Agencies must create...

  2. Integrated System Health Management (ISHM): Systematic Capability Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Holland, Randy; Schmalzwel, John; Duncavage, Dan

    2006-01-01

    This paper provides a credible approach for implementation of ISHM capability in any system. The requirements and processes to implement ISHM capability are unique in that a credible capability is initially implemented at a low level, and it evolves to achieve higher levels by incremental augmentation. In contrast, typical capabilities, such as thrust of an engine, are implemented once at full Functional Capability Level (FCL), which is not designed to change during the life of the product. The approach will describe core ingredients (e.g. technologies, architectures, etc.) and when and how ISHM capabilities may be implemented. A specific architecture/taxonomy/ontology will be described, as well as a prototype software environment that supports development of ISHM capability. This paper will address implementation of system-wide ISHM as a core capability, and ISHM for specific subsystems as expansions and evolution, but always focusing on achieving an integrated capability.

  3. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    ERIC Educational Resources Information Center

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  4. Transportation and disposal configuration for DOE-managed low-level and mixed low-level waste

    SciTech Connect

    Johnsen, T.

    1993-06-01

    This report briefly examines the current U.S. Department of Energy complex-wide configuration for transportation and disposal of low-level and mixed low-level waste, and also retraces the historical sequence of events and rationale that has guided its development. The study determined that Nevada Test Site and the Hanford Site are the only two sites that currently provide substantial disposal services for offsite low-level waste generators. It was also determined that mixed low-level waste shipments are infrequent and are generally limited to shipments to offsite commercial treatment facilities or other Department of Energy sites for storage. The current alignment of generator to disposal site for low-level waste shipments is generally consistent with the programmatic mission of the generator; that is, defense-generated waste is shipped to the Nevada Test Site and research-generated waste is transported to the Hanford Site. The historical development of the current configuration was resurrected by retrieving Department of Energy documentation and interviewing both current and former department and contractor personnel. According to several accounts, the basic framework of the system was developed during the late 1970s, and was reportedly based on the ability of the disposal site to manage a given waste form. Documented evidence to support this reasoning, however, could not be uncovered.

  5. Using an Innovation Configuration Component Map To Assess the Relationship between Student Achievement and the Degree of Implementation of Extended School Services in a Sample of Kentucky Middle Schools.

    ERIC Educational Resources Information Center

    Craig, James R.; Kacer, Barbara A.

    One of the diagnostic tools used in the evaluation of programs implemented under the Kentucky Education Reform Act (KERA) (1990) is the Innovation Configuration Component (ICC) Map, designed to specify the key elements associated with an innovation and to define what "use" means in the context of implementing an innovation. This study investigated…

  6. Tailoring Green Infrastructure Implementation Scenarios based on Stormwater Management Objectives

    EPA Science Inventory

    Green infrastructure (GI) refers to stormwater management practices that mimic nature by soaking up, storing, and controlling onsite. GI practices can contribute reckonable benefits towards meeting stormwater management objectives, such as runoff peak shaving, volume reduction, f...

  7. Design and implementation of web service-based mobile reply testing management system

    NASA Astrophysics Data System (ADS)

    Gao, Liang; Han, Yu-min

    2013-03-01

    This paper introduces the design and implementation of a reply testing management system that based-on C#, Web Service and ASP .Net. With the system, teachers can manage reply site through Windows Mobile, judges can grade onscene by visiting WAP site through GPRS. Then this paper discusses details of the implementation and key technologies of the system.

  8. 77 FR 5048 - Notice of Bureau of Land Management Implementation of Recreation Resource Advisory Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... Bureau of Land Management Notice of Bureau of Land Management Implementation of Recreation Resource Advisory Committee Provisions of the Federal Lands Recreation Enhancement Act AGENCY: Bureau of Land...) implementation of the Recreation Resource Advisory Committee (R/ RAC) provisions of the Federal Lands...

  9. The Implementation of Enrollment Management at Two Public Universities Experiencing Demographic and Funding Challenges

    ERIC Educational Resources Information Center

    Lee, Stephen

    2010-01-01

    The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…

  10. 12 CFR 192.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may implement a stock option plan (Option Plan), an employee stock ownership plan or other...

  11. Comparative thermal analysis of alternate Cryogenic Fluid Management Experiment (CFME) configurations

    NASA Technical Reports Server (NTRS)

    Merino, F.; Oneill, R. F.

    1980-01-01

    The Cryogenic Fluid Management Experiment (CFME) was analyzed to assess the feasibility and advisability of deleting the vapor cooled shield (VCS) from the baseline CFME insulation and pressure control system. Two alternate concepts of CFME insulation and pressure control, neither of which incorporated the VCS, were investigated. The first concept employed a thermodynamic vent system (TVS) to throttle the flow through an internal wall mounted heat exchanger (HX) within the pressure vessel to decrease boiloff and pressure rise rate, while the second concept utilized a TVS without an internal heat exchanger. Only the first concept was viable. Its performance was assessed for a seven day mission and found to be satisfactory. It was also concluded that VCS development costs would be greater than for an internal HX installation. Based upon the above comparisons, the HX was recommended as a replacement for the VCS.

  12. Implementing a Nurse Manager Profile to Improve Unit Performance.

    PubMed

    Krugman, Mary E; Sanders, Carolyn L

    2016-06-01

    Nurse managers face significant pressures in the rapidly changing healthcare environment. Staying current with multiple sources of data, including reports that detail institutional and unit performance outcomes, is particularly challenging. A Nurse Manager Customized Profile was developed at a western academic hospital to provide a 1-page visual of pertinent data to help managers and director supervisors focus coaching to improve unit performance. Use of the Decisional Involvement Scale provided new insights into measuring manager performance. PMID:27163873

  13. Implementing Human Resources Management (HRM) within Dutch VET Institutions: Examining the Fostering and Hindering Factors

    ERIC Educational Resources Information Center

    Runhaar, Piety; Sanders, Karin

    2013-01-01

    Vocational Education and Training (VET) Institutions face serious challenges, like the implementation of competence-based education and upcoming teacher shortages, which urge them to implement Human Resources Management policy and practices (HRM). The implementation of HRM, however, often stagnates. This paper describes a qualitative study--in…

  14. Crisis crowdsourcing framework: designing strategic configurations of crowdsourcing for the emergency management domain

    USGS Publications Warehouse

    Liu, Sophia B.

    2014-01-01

    Crowdsourcing is not a new practice but it is a concept that has gained significant attention during recent disasters. Drawing from previous work in the crisis informatics, disaster sociology, and computer-supported cooperative work (CSCW) literature, the paper first explains recent conceptualizations of crowdsourcing and how crowdsourcing is a way of leveraging disaster convergence. The CSCW concept of “articulation work” is introduced as an interpretive frame for extracting the salient dimensions of “crisis crowdsourcing.” Then, a series of vignettes are presented to illustrate the evolution of crisis crowdsourcing that spontaneously emerged after the 2010 Haiti earthquake and evolved to more established forms of public engagement during crises. The best practices extracted from the vignettes clarified the efforts to formalize crisis crowdsourcing through the development of innovative interfaces designed to support the articulation work needed to facilitate spontaneous volunteer efforts. Extracting these best practices led to the development of a conceptual framework that unpacks the key dimensions of crisis crowdsourcing. The Crisis Crowdsourcing Framework is a systematic, problem-driven approach to determining the why, who, what, when, where, and how aspects of a crowdsourcing system. The framework also draws attention to the social, technological, organizational, and policy (STOP) interfaces that need to be designed to manage the articulation work involved with reducing the complexity of coordinating across these key dimensions. An example of how to apply the framework to design a crowdsourcing system is offered with with a discussion on the implications for applying this framework as well as the limitations of this framework. Innovation is occurring at the social, technological, organizational, and policy interfaces enabling crowdsourcing to be operationalized and integrated into official products and services.

  15. Unterstützung der IT-Service-Management-Prozesse an der Technischen Universität München durch eine Configuration-Management-Database

    NASA Astrophysics Data System (ADS)

    Knittl, Silvia

    Hochschulprozesse in Lehre und Verwaltung erfordern durch die steigende Integration und IT-Unterstützung ein sogenanntes Business Alignment der IT und damit auch ein professionelleres IT-Service-Management (ITSM). Die IT Infrastructure Library (ITIL) mit ihrer Beschreibung von in der Praxis bewährten Prozessen hat sich zum de-facto Standard im ITSM etabliert. Ein solcher Prozess ist das Konfigurationsmanagement. Es bildet die IT-Infrastruktur als Konfigurationselemente und deren Beziehungen in einem Werkzeug, genannt Configuration Management Database (CMDB), ab und unterstützt so das ITSM. Dieser Bericht beschreibt die Erfahrungen mit der prototypischen Einführung einer CMDB an der Technischen Universität München.

  16. The implementation of self-managed teams in health care.

    PubMed

    Schrubb, D A

    1992-08-01

    Self-managed teams are one of the most effective tools now available for tapping the unrealized potential of health care organizations. Executives and managers involved with self-managed teams are speaking of new levels of productivity, new commitment among workers, and new optimism about meeting the challenges of competition. GSH's ability to create peak-performance teams will certainly give the hospital a critical competitive advantage over competing hospitals in the Dayton area. Success requires commitment and patience. Health care organizations that believe in the power of worker participation will not regret following the path to a self-managed team environment.

  17. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  18. Operational Dynamic Configuration Analysis

    NASA Technical Reports Server (NTRS)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  19. Financial Management. Guide to Standards and Implementation. Career & Technology Studies.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.

    This Alberta curriculum guide defines competencies that help students build daily living skills, investigate career options in financial management, use technology in the financial management field effectively and efficiently, and prepare for entry into the workplace or related postsecondary programs. The first section provides a program rationale…

  20. 78 FR 68811 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... the National Forest System Land Management Planning Rule. The purpose of this meeting is to...

  1. 78 FR 9883 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... Forest System Land Management Rule. The meeting is also open to the public. The purpose of the meeting...

  2. 78 FR 34034 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... Management Planning Directives. The meeting is also open to the public. DATES: The meeting will be held,...

  3. 78 FR 46565 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... of the National Forest System Land Management Planning Rule. The purpose of this meeting is...

  4. 78 FR 23219 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... Land Management Planning Directives. DATES: The meeting will be held on May 7-9, 2013, from 8:30...

  5. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  6. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  7. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  8. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What records management principles must agencies implement? 1220.32 Section 1220.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT FEDERAL RECORDS; GENERAL Agency Records Management Responsibilities § 1220.32 What...

  9. Self-Managed Work Teams in Nursing Homes: Implementing and Empowering Nurse Aide Teams

    ERIC Educational Resources Information Center

    Yeatts, Dale E.; Cready, Cynthia; Ray, Beth; DeWitt, Amy; Queen, Courtney

    2004-01-01

    Purpose: This article describes the progress of our study to examine the advantages and costs of using self-managed nurse aide teams in nursing homes, steps that are being taken to implement such teams, and management strategies being used to manage the teams. Design and Methods: A quasi-experimental design is underway where certified nurse aide…

  10. A Course in Administration for Managers of Information Services: Design, Implementation and Topical Outline.

    ERIC Educational Resources Information Center

    Wasserman, Paul; Rizzo, John R.

    A topical outline for courses in administration for managers of information services, and a set of guidelines for designing and implementing these courses are included in this manual for those responsible for planning, developing, and offering management training programs. Key elements in presenting and developing management skills of information…

  11. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  12. Implementing Quality Management in the University: The Role of Leadership in Finnish Universities

    ERIC Educational Resources Information Center

    Anyamele, Stephen Chukwu

    2005-01-01

    This paper investigates how university leaders in Finland implement quality management in their respective institutions. The study uses a modified model of the European Foundation for Quality Management (EFQM) Excellence Model as a theoretical base in eliciting information on quality management strategies from the senior academic leaders in these…

  13. Digital Library Billing Management System Design and Implementation

    NASA Astrophysics Data System (ADS)

    Nie, Ying

    Based on the database of SQL Server, a new automated billing and management system was designed using a range of forms, menus and control room provided by VB. In this new design, WINDOWS registry and API functions ware used, as well DAO and ADO data access and other advanced means. A good interactive interface was available and users could obtain a fresh and different feeling. Demonstrated by the application, the system provided accurate and reliable function and satisfied the needs of modern managements. The system is suitable for automatic billing of colleges and internet cafes management.

  14. Fully Internally Contracted Multireference Configuration Interaction Theory Using Density Matrix Renormalization Group: A Reduced-Scaling Implementation Derived by Computer-Aided Tensor Factorization.

    PubMed

    Saitow, Masaaki; Kurashige, Yuki; Yanai, Takeshi

    2015-11-10

    We present an extended implementation of the multireference configuration interaction (MRCI) method combined with the quantum-chemical density matrix renormalization group (DMRG). In the previous study, we introduced the combined theory, referred to as DMRGMRCI, as a method to calculate high-level dynamic electron correlation on top of the DMRG wave function that accounts for active-space (or strong) correlation using a large number of active orbitals. The DMRG-MRCI method is built on the full internal-contraction scheme for the compact reference treatment and on the cumulant approximation for the treatment of the four-particle rank reduced density matrix (4-RDM). The previous implementation achieved the MRCI calculations with the active space (24e,24o), which are deemed the record largest, whereas the inherent Nact 8 × N complexity of computation was found a hindrance to using further large active space. In this study, an extended optimization of the tensor contractions is developed by explicitly incorporating the rank reduction of the decomposed form of the cumulant-approximated 4-RDM into the factorization. It reduces the computational scaling (to Nact7 × N) as well as the cache-miss penalty associated with direct evaluation of complex cumulant reconstruction. The present scheme, however, faces the increased complexity of factorization patterns for optimally implementing the tensor contraction terms involving the decomposed 4-RDM objects. We address this complexity using the enhanced symbolic manipulation computer program for deriving and coding programmable equations. The new DMRG-MRCI implementation is applied to the determination of the stability of the iron(IV)-oxo porphyrin relative to the iron(V) electronic isomer (electromer) using the active space (29e,29o) (including four second d-shell orbitals of iron) with triple-ζ-quality atomic orbital basis sets. The DMRG-cu(4)-MRCI+Q model is shown to favor the triradicaloid iron(IV)-oxo state as the lowest

  15. Change Management – Recommendations for Successful Electronic Medical Records Implementation

    PubMed Central

    Shoolin, J.S.

    2010-01-01

    Summary Change is difficult and managing change even more so. With the advent of Electronic Medical Records (EMRs) and the difficulty of its acceptance, understanding physician’s attitudes and the psychology of change management is imperative. While many authors describe change management theories, one comes nearest to describing this particularly difficult transition. In 1969, Elizabeth Kübler-Ross wrote her seminal treatise, On Death and Dying, detailing the psychological changes terminally ill patients undergo. Her grieving model is a template to examine the impact of change. By following a physician through the EMR maze, understanding the difficulties he/she perceives and developing a plan other change agents are able to use, the paper gives practical recommendations to EMR change management. PMID:23616842

  16. Interval Management: Development and Implementation of an Airborne Spacing Concept

    NASA Technical Reports Server (NTRS)

    Barmore, Bryan E.; Penhallegon, William J.; Weitz, Lesley A.; Bone, Randall S.; Levitt, Ian; Flores Kriegsfeld, Julia A.; Arbuckle, Doug; Johnson, William C.

    2016-01-01

    Interval Management is a suite of ADS-B-enabled applications that allows the air traffic controller to instruct a flight crew to achieve and maintain a desired spacing relative to another aircraft. The flight crew, assisted by automation, manages the speed of their aircraft to deliver more precise inter-aircraft spacing than is otherwise possible, which increases traffic throughput at the same or higher levels of safety. Interval Management has evolved from a long history of research and is now seen as a core NextGen capability. With avionics standards recently published, completion of an Investment Analysis Readiness Decision by the FAA, and multiple flight tests planned, Interval Management will soon be part of everyday use in the National Airspace System. Second generation, Advanced Interval Management capabilities are being planned to provide a wider range of operations and improved performance and benefits. This paper briefly reviews the evolution of Interval Management and describes current development and deployment plans. It also reviews concepts under development as the next generation of applications.

  17. The New Middle Management: Intermediary Organizations in Education Policy Implementation

    ERIC Educational Resources Information Center

    Honig, Meredith I.

    2004-01-01

    Intermediary organizations have become increasingly prominent participants in education policy implementation despite limited knowledge about their distinctive functions and the conditions that constrain and enable those functions. This article addresses that research-practice gap by drawing on theories of organizational ecology and findings from…

  18. [Quality management systems in radiology: implementation in hospital and radiology practice].

    PubMed

    Teichgräber, U; de Bucourt, M

    2010-11-01

    The concept of quality and the principle of continuous quality improvement are implemented by quality management systems. Quality management systems surpass mere quality control. These systems account for patient and employee needs, the management style and the structure of an enterprise. Many of these quality management systems are used in the health care industry. Some of these systems and their form of application in radiology are introduced here. PMID:20577939

  19. The design and implementation of hydrographical information management system (HIMS)

    NASA Astrophysics Data System (ADS)

    Sui, Haigang; Hua, Li; Wang, Qi; Zhang, Anming

    2005-10-01

    With the development of hydrographical work and information techniques, the large variety of hydrographical information including electronic charts, documents and other materials are widely used, and the traditional management mode and techniques are unsuitable for the development of the Chinese Marine Safety Administration Bureau (CMSAB). How to manage all kinds of hydrographical information has become an important and urgent problem. A lot of advanced techniques including GIS, RS, spatial database management and VR techniques are introduced for solving these problems. Some design principles and key techniques of the HIMS including the mixed mode base on B/S, C/S and stand-alone computer mode, multi-source & multi-scale data organization and management, multi-source data integration and diverse visualization of digital chart, efficient security control strategies are illustrated in detail. Based on the above ideas and strategies, an integrated system named Hydrographical Information Management System (HIMS) was developed. And the HIMS has been applied in the Shanghai Marine Safety Administration Bureau and obtained good evaluation.

  20. Constraints to Senior Management's Capacity to Implement the Performance Management System in Senior Secondary Schools in Botswana

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2013-01-01

    The performance management system in different forms has been in existence in many countries for some years. In 1999 Botswana like other countries decided to implement a performance management system (PMS) across the entire public service including schools. At its introduction, the government explained the purpose for which this reform was being…

  1. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  2. Aircraft Configuration and Flight Crew Compliance with Procedures While Conducting Flight Deck Based Interval Management (FIM) Operations

    NASA Technical Reports Server (NTRS)

    Shay, Rick; Swieringa, Kurt A.; Baxley, Brian T.

    2012-01-01

    Flight deck based Interval Management (FIM) applications using ADS-B are being developed to improve both the safety and capacity of the National Airspace System (NAS). FIM is expected to improve the safety and efficiency of the NAS by giving pilots the technology and procedures to precisely achieve an interval behind the preceding aircraft by a specific point. Concurrently but independently, Optimized Profile Descents (OPD) are being developed to help reduce fuel consumption and noise, however, the range of speeds available when flying an OPD results in a decrease in the delivery precision of aircraft to the runway. This requires the addition of a spacing buffer between aircraft, reducing system throughput. FIM addresses this problem by providing pilots with speed guidance to achieve a precise interval behind another aircraft, even while flying optimized descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR) human-in-the-loop experiment employed 24 commercial pilots to explore the use of FIM equipment to conduct spacing operations behind two aircraft arriving to parallel runways, while flying an OPD during high-density operations. This paper describes the impact of variations in pilot operations; in particular configuring the aircraft, their compliance with FIM operating procedures, and their response to changes of the FIM speed. An example of the displayed FIM speeds used incorrectly by a pilot is also discussed. Finally, this paper examines the relationship between achieving airline operational goals for individual aircraft and the need for ATC to deliver aircraft to the runway with greater precision. The results show that aircraft can fly an OPD and conduct FIM operations to dependent parallel runways, enabling operational goals to be achieved efficiently while maintaining system throughput.

  3. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  4. HEALTH CARE GUIDE TO POLLUTION PREVENTION IMPLEMENTATION THROUGH ENVIRONMENTAL MANAGEMENT SYSTEMS

    EPA Science Inventory

    The Health Care Guide to Pollution Prevention Implementation through Environmental Management Systems provides example EMS procedures and forms used in four ISO 14001 EMS certified hospitals. The latest revisions include more EMS hospital case studies, more compliance resources, ...

  5. Implementing Special Education. School Management Handbook Number 4.

    ERIC Educational Resources Information Center

    National Association of Elementary School Principals, Arlington, VA.

    This part of the School Management Handbook provides elementary school administrators with an overview of some of the special education regulations mandated in Public Law 94-142, the Education for All Handicapped Children Act. Section 1 of the document defines screening and evaluation procedures for identifying handicapping conditions of children…

  6. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    ERIC Educational Resources Information Center

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  7. The Implementation of Mock Negotiations in Teaching International Business Management.

    ERIC Educational Resources Information Center

    Raffield, Barney T., III

    Mock negotiations are used as part of an undergraduate course in international business management at Lebanon Valley College (Pennsylvania) in order to introduce students to the process of negotiating for advantage in foreign countries and to emphasize the importance of an individual nation's customs, culture, and ways of transacting business in…

  8. HAMMER COURSEWARE MANAGEMENT SYSTEM (CMS) SYSTEM DEVELOPMENT & IMPLEMENTATION

    SciTech Connect

    GARDNER, P.R.

    2006-04-28

    HAMMER Courseware Management System (HAMMERCMS) is the official name of the system Fluor Hanford, Inc., uses to facilitate development of, deliver, and track training presented in some electronic form (mainly, web-based training) to Hanford Site employees, subcontractors, and vendors.

  9. Performance Management in UK Universities: Implementing the Balanced Scorecard

    ERIC Educational Resources Information Center

    Taylor, John; Baines, Claire

    2012-01-01

    In recent years, UK universities have become increasingly concerned with performance management. This trend reflects both growing competition and marketisation within higher education, and the increasing requirements for accountability. In response, institutions have begun to explore the application of formal methodologies for performance…

  10. Scope Management: A Core Information System Implementation Project Pedagogy

    ERIC Educational Resources Information Center

    Léger, Pierre-Majorique; Lyle, Derick; Babin, Gilbert; Charland, Patrick; Pellerin, Robert

    2013-01-01

    This article describes an initiative to provide IS management a capstone course that builds on the zone of proximal development concept, oriented towards developing prioritization and critical reasoning skills, and to promote self-learning. Request for proposal business cases appear to offer effective mechanisms for retaining context, while…

  11. Digital Rights Management Implemented by RDF Graph Approach

    ERIC Educational Resources Information Center

    Yang, Jin Tan; Horng, Huai-Chien

    2006-01-01

    This paper proposes a design framework for constructing Digital Rights Management (DRM) that enables learning objects in legal usage. The central theme of this framework is that any design of a DRM must have theories as foundations to make the maintenance, extension or interoperability easy. While a learning objective consists of learning…

  12. Implementing Integrated Multicultural Instructional Design in Management Education

    ERIC Educational Resources Information Center

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  13. National Risk Management Research Laboratory Strategic plan and Implementation - Overview

    EPA Science Inventory

    This publication provides an overview of the strategic plan recently developed by the National Risk Management Research Laboratory (NRMRL). It includes a description of NRMRL's mission and goals and their alignment with Agency goals. Additionally, the overview contains a brief se...

  14. Illustrating the multiple facets and levels of fidelity of implementation to a teacher classroom management intervention.

    PubMed

    Reinke, Wendy M; Herman, Keith C; Stormont, Melissa; Newcomer, Lori; David, Kimberly

    2013-11-01

    Many school-based interventions to promote student mental health rely on teachers as implementers. Thus, understanding the interplay between the multiple domains of fidelity to the intervention and intervention support systems such as coaching and teacher implementation of new skills is an important aspect of implementation science. This study describes a systematic process for assessing multiple domains of fidelity. Data from a larger efficacy trial of the Incredible Years Teacher Classroom Management (IY TCM) program are utilized. Data on fidelity to the IY TCM workshop training sessions and onsite weekly coaching indicate that workshop leaders and the IY TCM coach implemented the training and coaching model with adequate adherence. Further, workshop leaders' ratings of engagement were associated with teacher implementation of specific praise, following training on this content. Lastly, the IY TCM coach differentiation of teacher exposure to coaching was evaluated and found to be associated with teacher implementation of classroom management practices and student disruptive behavior.

  15. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  16. Implementing a Compressed Air System Leak Management Program at an Automotive Plant (Visteon's Monroe Plant)

    SciTech Connect

    2001-01-01

    The energy team at Visteon’s Monroe plant, formerly owned by Ford Motor Company, implemented an ongoing compressed air system leak management program. The team developed an approach that combined a traditional “find and fix” effort with an innovative implementation and marketing program. As a result of the leak management program, compressed air system consumption was reduced by more than 50% on a per production unit basis.

  17. Detailed requirements document for Stowage List and Hardware Tracking System (SLAHTS). [computer based information management system in support of space shuttle orbiter stowage configuration

    NASA Technical Reports Server (NTRS)

    Keltner, D. J.

    1975-01-01

    The stowage list and hardware tracking system, a computer based information management system, used in support of the space shuttle orbiter stowage configuration and the Johnson Space Center hardware tracking is described. The input, processing, and output requirements that serve as a baseline for system development are defined.

  18. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  19. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  20. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  1. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  2. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  3. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  4. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... of 1990 Implementation of Title I; Proposed Rule,'' (the NO X Supplement), 57 FR 55620, November 25... General Preamble for the Implementation of Title I of the Clean Air Act Amendments of 1990,'' 59 FR 41998...'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735,...

  5. Implementation of an Integrated Information Management System at the National Library of Wales: A Case Study

    ERIC Educational Resources Information Center

    Evans, Manon Foster; Thomas, Sian

    2007-01-01

    Purpose: This paper aims to describe the experiences of the National Library of Wales in implementing an integrated information management system. Design/methodology/approach: Discusses the stages involved in the procurement process, data migration and general system implementation. Findings: Emphasises the need for a well-prepared yet flexible…

  6. Implementing an Open Source Learning Management System: A Critical Analysis of Change Strategies

    ERIC Educational Resources Information Center

    Uys, Philip M.

    2010-01-01

    This paper analyses the change and innovation strategies that Charles Sturt University (CSU) used from 2007 to 2009 during the implementation and mainstreaming of an open source learning management system (LMS), Sakai, named locally as "CSU Interact". CSU was in January 2008 the first Australian University to implement an open source learning…

  7. Theory into practice: implementing ecosystem management objectives in the USDA Forest Service.

    PubMed

    Butler, Kelly F; Koontz, Tomas M

    2005-02-01

    In the United States and around the world, scientists and practitioners have debated the definition and merits of ecosystem management as a new approach to natural resource management. While these debates continue, a growing number of organizations formally have adopted ecosystem management. However, adoption does not necessarily lead to successful implementation, and theories are not always put into practice. In this article, we examine how a leading natural resource agency, the United States Department of Agriculture Forest Service, has translated ecosystem management theory into concrete policy objectives and how successfully these objectives are perceived to be implemented throughout the national forest system. Through document analysis, interviews, and survey responses from 345 Forest Service managers (district rangers, forest supervisors, and regional foresters), we find that the agency has incorporated numerous ecosystem management components into its objectives. Agency managers perceive that the greatest attainment of such objectives is related to collaborative stewardship and integration of scientific information, areas in which the organization has considerable prior experience. The objectives perceived to be least attained are adaptive management and integration of social and economic information, areas requiring substantial new resources and a knowledge base not traditionally emphasized by natural resource managers. Overall, success in implementing ecosystem management objectives is linked to committed forest managers.

  8. Transition management - An analysis of strategic considerations for effective implementation

    NASA Technical Reports Server (NTRS)

    Hunsucker, John L.; Loos, David

    1989-01-01

    Six managerial guidelines are identified for facilitating successful change in an organization. They are: (1) the need for a catalyst to initiate change; (2) the setting of organizational goals which take into account the impact of technical, political, and cultural factors; (3) requiring a transition team to guide the change; (4) a demonstration by top management of a commitment to the change as well as their acting as change agents; (5) the utilization of employee participation and good communication to help overcome employee resistance; and (6) the evaluation of the change program as important to the success of present and future change programs. A description of each guideline is presented, and its importance is examined. Available options are also presented for management to deal with each of the guidelines.

  9. Integrated Disability Management: Implementing a Customized Whole-Person Approach.

    PubMed

    Bruen, Phil

    2016-01-01

    This article describes how incorporating integrated disability management can address business challenges. It includes case studies featuring organizations that used a "whole-person approach" to result in (1) greater and more effective communication and reporting, (2) more satisfied and productive employees and (3) cost savings through quicker return to work when legally and medically appropriate, all in alignment with the particular needs of a given firm. One size most definitely does not fit all. PMID:27491138

  10. Implementing a Case Management Initiative in High-Need Schools

    PubMed Central

    Gifford, Elizabeth J.

    2013-01-01

    States continue to experiment with ways of improving health and human service use by people with complex needs. Such efforts have often sought to increase individual and family control over services as well as to enhance coordination among providers. Paths to achieving these goals are not well understood. This study draws on two previously distinct conceptual frameworks to examine how 71 public schools implemented a team approach to increasing family and agency engagement for children at risk. Results from longitudinal data fit the core components expected to affect implementation and also indicated sustainability, but in ways distinctive to the initiative's public school settings. Accountability to the state appeared to be a major catalyst, yet in some respects also constrained local agencies from participating as intended. School inertia may have both undermined the program through some evaluation practices and gaps in administrative support, and supported integration into organizational routines and successful experimentation over time in increasing caregiver involvement. Family hesitation about sharing information with multiple agencies may also help explain why the goal of seamless coordination remains elusive. PMID:23976809

  11. Total quality management: Strengths and barriers to implementation and cultural adaptation

    NASA Technical Reports Server (NTRS)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-01-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  12. A Solution for Establishing the Information Technology Service Management Processes Implementation Sequence

    NASA Astrophysics Data System (ADS)

    Arcilla, Magdalena; Calvo-Manzano, Jose; Cuevas, Gonzalo; Gómez, Gerzon; Ruiz, Elena; San Feliu, Tomás

    This paper addresses the implementation sequence of Services Management processes defined in ITIL v2, from a topological perspective. Graphs Theory is used to represent the existing dependencies among the ITIL v2 processes, in order to find clusters of strongly connected processes. These clusters will help to determine the implementation priority of the service management processes. For it, OPreSSD (Organizational Procedure for Service Support and Service Delivery) is proposed in order to identify the processes implementation sequence related to the Service Support (SS) and Service Delivery (SD) areas.

  13. Total quality management: Strengths and barriers to implementation and cultural adaptation

    NASA Astrophysics Data System (ADS)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-09-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  14. Overcoming constraints to the implementation of water demand management in southern Africa

    NASA Astrophysics Data System (ADS)

    Mwendera, E. J.; Hazelton, D.; Nkhuwa, D.; Robinson, P.; Tjijenda, K.; Chavula, G.

    This paper presents results of a study on water demand management status and overcoming constraints to implementation of water demand management in the southern African region, as part of Phase II of water demand management (WDM) programme implemented by the IUCN (The World Conservation Union). The study was conducted in Malawi, Namibia, South Africa, Swaziland, Zambia and Zimbabwe. The study methodology consisted of a survey of literature, and interviewing and communicating with stakeholders in order to learn from stakeholders on the critical constraints to WDM implementation and strategies to overcome them. The study has shown that, despite the potential savings that would accrue from implementation of WDM, the water sector across the southern African region continues to focus on water supply augmentation. There are inadequate financial and human resources for rehabilitation, operation and maintenance of water conveyance systems resulting in system leaks, which contribute to high levels of unaccounted-for water, a situation that masks the potential benefits of WDM. In most countries, the water sector operates on ad-hoc sub-sector water user objectives, which provided guidelines only for development and management purposes. Most of the institutional frameworks have remained diffuse, resulting into poor performance in the sector, and into crisis management in the water resources development. Though the WDM policy in most countries is already accessible through guidelines for catchment management institutions and water supply institutions; there is a lack of broad commitment to implementing them. In other countries the instruments are relatively new and have not been applied widely. Similarly, the effectiveness of instruments has not been well evaluated in most countries. In countries where policy is weak there is often a lack of clarity as to who is responsible for WDM implementation, and even less clarity on who is responsible for facilitating and monitoring

  15. 33 CFR 151.2035 - Implementation schedule for approved ballast water management methods.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE, AND BALLAST WATER Ballast Water Management for Control of Nonindigenous Species in Waters of the United States § 151.2035 Implementation schedule for approved ballast water management methods. (a) To discharge ballast water into waters of the United States, the...

  16. The Quality Improvement Management Approach as Implemented in a Middle School.

    ERIC Educational Resources Information Center

    Bayless, David L.; And Others

    1992-01-01

    The Total Quality Management Theory of W. E. Deming can be adapted within an educational organization to build structures that support educators' beliefs. A case study of the implementation of Deming principles at the LeRoy Martin Middle School in Raleigh (North Carolina) illustrates the effectiveness of this management approach. (SLD)

  17. Design and Implementation of Training to Improve Management of Pediatric Overweight

    ERIC Educational Resources Information Center

    Beno, Luke; Hinchman, Josephine; Kibbe, Debra; Trowbridge, Frederick

    2005-01-01

    Introduction: Clinicians report a low proficiency in treating overweight children and using behavioral management strategies. This paper documents the design and implementation of a training program to improve clinicians' skills in the assessment and behavioral management of pediatric overweight. Methods: Two one-hour CME trainings were designed…

  18. Strategies Nurse Managers Used to Offset Challenges during Electronic Medical Records Implementation: A Case Study

    ERIC Educational Resources Information Center

    Easterling, Latasha

    2015-01-01

    The purpose of this qualitative, descriptive case study was to discover successful approaches used, by nurse managers, to reduce barriers during the implementation of electronic medical record system in one hospital. Fourteen nurse managers were interviewed from an academic health science center in Mississippi. A pilot study was conducted to…

  19. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    SciTech Connect

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  20. Changes in Organizational Climate Associated with Development and Implementation of an Educational Management System.

    ERIC Educational Resources Information Center

    Bonney, Lewis A.

    The development and implementation of a humanistic educational management system in a large urban school district has been associated with demonstrable changes in organizational climate. The management system is humanistic in that teachers and principals select their educational priorities based on student needs and mutually agree with supervisors…

  1. Implementing a New Cloud Computing Library Management Service: A Symbiotic Approach

    ERIC Educational Resources Information Center

    Dula, Michael; Jacobsen, Lynne; Ferguson, Tyler; Ross, Rob

    2012-01-01

    This article presents the story of how Pepperdine University migrated its library management functions to the cloud using what is now known as OCLC's WorldShare Management Services (WMS). The story of implementing this new service is told from two vantage points: (1) that of the library; and (2) that of the service provider. The authors were the…

  2. Implementation of retrofit best management practices in a suburban watershed (Cincinnati OH) via economic incentives

    EPA Science Inventory

    There is great potential for managing stormwater runoff quantity; however, implementation in already-developed areas remains a challenge. We assess the viability of economic incentives to place best management practices (BMPs) on parcels in a 1.8 km2 suburban watershed near Cinci...

  3. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Management District and San Joaquin Valley Unified Air Pollution Control District AGENCY: Environmental... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP)....

  4. Implementation guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511

    SciTech Connect

    McDaniel, L.B.

    1998-04-17

    This report is an Implementation Guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511 to provide a set of uniform instructions for managing the two contractors selected. The primary objective is to produce the necessary deliverables and services for the HTI project within schedule and budget.

  5. Pathology and failure in the design and implementation of adaptive management

    USGS Publications Warehouse

    Allen, Craig R.; Gunderson, Lance H.

    2011-01-01

    The conceptual underpinnings for adaptive management are simple; there will always be inherent uncertainty and unpredictability in the dynamics and behavior of complex ecological systems as a result non-linear interactions among components and emergence, yet management decisions must still be made. The strength of adaptive management is in the recognition and confrontation of such uncertainty. Rather than ignore uncertainty, or use it to preclude management actions, adaptive management can foster resilience and flexibility to cope with an uncertain future, and develop safe to fail management approaches that acknowledge inevitable changes and surprises. Since its initial introduction, adaptive management has been hailed as a solution to endless trial and error approaches to complex natural resource management challenges. However, its implementation has failed more often than not. It does not produce easy answers, and it is appropriate in only a subset of natural resource management problems. Clearly adaptive management has great potential when applied appropriately. Just as clearly adaptive management has seemingly failed to live up to its high expectations. Why? We outline nine pathologies and challenges that can lead to failure in adaptive management programs. We focus on general sources of failures in adaptive management, so that others can avoid these pitfalls in the future. Adaptive management can be a powerful and beneficial tool when applied correctly to appropriate management problems; the challenge is to keep the concept of adaptive management from being hijacked for inappropriate use.

  6. Forrest Conservation Area : Management & Implementation FY 2004 Annual Report.

    SciTech Connect

    Smith, Brent

    2008-12-01

    The Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Conservation Area during July of 2002. The property is located in the Upper John Day subbasin within the Columbia basin. The property consists of two parcels comprising 4,232 acres. The Mainstem parcel consists of 3,445 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem John Day River. The Middle Fork parcel consists of 786 acres and is located one mile to the west of the town of Austin, OR on the Middle Fork John Day River. The Forrest Conservation Area is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. Acquisition of the Forrest Conservation Area was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by hydroelectric facilities on the Columbia River and its tributaries. The intent of the Conservation Area is to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, {section}11.1, {section}7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of management funding for the protection and restoration of fish and wildlife habitat through a memorandum of agreement.

  7. NEPA implementation: The Department of Energy`s program to manage spent nuclear fuel

    SciTech Connect

    Shipler, D.B.

    1994-05-01

    The Department of Energy (DOE) is implementing the National Environmental Protection Act (NEPA) in its management of spent nuclear fuel. The DOE strategy is to address the short-term safety concerns about existing spent nuclear fuel, to study alternatives for interim storage, and to develop a long-range program to manage spent nuclear fuel. This paper discusses the NEPA process, the environmental impact statements for specific sites as well as the overall program, the inventory of DOE spent nuclear fuel, the alternatives for managing the fuel, and the schedule for implementing the program.

  8. A crisis management quality improvement initiative in a children's psychiatric hospital: design, implementation, and outcome.

    PubMed

    Paccione-Dyszlewski, Margaret R; Conelea, Christine A; Heisler, Walter C; Vilardi, Jodie C; Sachs, Henry T

    2012-07-01

    Behavioral crisis management, including the use of seclusion and restraint, is the most high risk process in the psychiatric care of children and adolescents. The authors describe hospital-wide programmatic changes implemented at a children's psychiatric hospital that aimed to improve the quality of crisis management services. Pre/post quantitative and qualitative data suggest reduced restraint and seclusion use, reduced patient and staff injury related to crisis management, and increased patient satisfaction during the post-program period. Factors deemed beneficial in program implementation are discussed.

  9. Aeropropulsion facilities configuration control: Procedures manual

    NASA Technical Reports Server (NTRS)

    Lavelle, James J.

    1990-01-01

    Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

  10. Managing and promoting change: implementing the Leg Club model.

    PubMed

    Seymour, Ellen

    2005-09-01

    Patient knowledge of their disease may increase concordance to compression therapy. The Lindsay Leg Club model (Lindsay, 2004) empowers the community nursing team to truly get to know their communities and deliver local, high-quality, evidence-based care for patients with leg ulcers and leg related problems. The author's experience of opening a Leg Club has lead to changes in clinical practice: re-evaluation of the use of long stretch bandages in favour of short stretch; replacing conventional compression bandage systems with two piece graduated compression hosiery; increased patient concordance post healing with increased use of compression hosiery; the introduction of toe bandaging and appropriate long-term management for those patients with lymphoedema; and developing the role of the nursing auxiliary in leg ulcer care.

  11. Study and implementation of the network management agent of telecommunication application server in NGN

    NASA Astrophysics Data System (ADS)

    Liu, Kun; He, Hui; Ni, Yuhua

    2013-03-01

    The telecommunication application server (AS) is an important part of the value-added service network in the next generation network(NGN) as the support platform. Remote, unified and secure management to a variety of services is implemented after the remote network management of the telecommunications application server. The network management system based on Simple Network Management Protocol (SNMP) is decided to utilized to analyse and study the network managed objects in AS because of the integration of telecommunications networks and computer networks on the network management and convenient, economical and flexible features of SNMP protocol. The network management agent module of AS is designed and an example is illustrated the details of the model. Results indicate the good performance of the network management agent.

  12. Syncope management unit: evolution of the concept and practice implementation.

    PubMed

    Shen, Win K; Traub, Stephen J; Decker, Wyatt W

    2013-01-01

    Syncope, a clinical syndrome, has many potential causes. The prognosis of a patient experiencing syncope varies from benign outcome to increased risk of mortality or sudden death, determined by the etiology of syncope and the presence of underlying disease. Because a definitive diagnosis often cannot be established immediately, hospital admission is frequently recommended as the "default" approach to ensure patient's safety and an expedited evaluation. Hospital care is costly while no studies have shown that clinical outcomes are improved by the in-patient practice approach. The syncope unit is an evolving practice model based on the hypothesis that a multidisciplinary team of physicians and allied staff with expertise in syncope management, working together and equipped with standard clinical tools could improve clinical outcomes. Preliminary data have demonstrated that a specialized syncope unit can improve diagnosis in a timely manner, reduce hospital admission and decrease the use of unnecessary diagnostic tests. In this review, models of syncope units in the emergency department, hospital and outpatient clinics from different practices in different countries are discussed. Similarities and differences of these syncope units are compared. Outcomes and endpoints from these studies are summarized. Developing a syncope unit with a standardized protocol applicable to most practice settings would be an ultimate goal for clinicians and investigators who have interest, expertise, and commitment to improve care for this large patient population.

  13. On the effectiveness in implementing a waste-management-plan method in construction

    SciTech Connect

    Tam, Vivian W.Y.

    2008-07-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method.

  14. Process-driven information management system at a biotech company: concept and implementation.

    PubMed

    Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin

    2004-01-01

    While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.

  15. Adaptive management of river flows in Europe: A transferable framework for implementation

    NASA Astrophysics Data System (ADS)

    Summers, M. F.; Holman, I. P.; Grabowski, R. C.

    2015-12-01

    The evidence base for defining flow regimes to support healthy river ecosystems is weak, as there are few studies which quantify the ecological impact associated with different degrees of hydrological alteration. As a result, river flow standards used to manage water abstraction are largely based on expert judgement. Planned adaptive management studies on multiple rivers under the European Water Framework Directive represent an opportunity to learn about ecological flow requirements and improve the quantitative evidence base. However, identifying clear ecological responses to flow alteration can be a significant challenge, because of the complexity of river systems and the other factors which may confound the response. This paper describes the Adaptive River Management (ARM) framework, a flexible framework for implementing adaptive management of river flows that is transferable to other regions of the world. Application of the framework will ensure that the effectiveness of implemented management actions is appraised and that transferable quantitative data are collected that can be used in other geographical regions.

  16. Ethical budgets: a critical success factor in implementing new public management accountability in health care.

    PubMed

    Bosa, Iris M

    2010-05-01

    New public management accountability is increasingly being introduced into health-care systems throughout the world - albeit with mixed success. This paper examines the successful introduction of new management accounting systems among general practitioners (GPs) as an aspect of reform in the Italian health-care system. In particular, the study examines the critical role played by the novel concept of an 'ethical budget' in engaging the willing cooperation of the medical profession in implementing change. Utilizing a qualitative research design, with in-depth interviews with GPs, hospital doctors and managers, along with archival analysis, the present study finds that management accounting can be successfully implemented among medical professionals provided there is alignment between the management imperative and the ethical framework in which doctors practise their profession. The concept of an 'ethical budget' has been shown to be an innovative and effective tool in achieving this alignment.

  17. Middle Managers' Experiences and Role in Implementing an Interactive Tailored Patient Assessment eHealth Intervention in Clinical Practice.

    PubMed

    Varsi, Cecilie; Ekstedt, Mirjam; Gammon, Deede; Børøsund, Elin; Ruland, Cornelia M

    2015-06-01

    The role of nurse and physician managers is considered crucial for implementing eHealth interventions in clinical practice, but few studies have explored this. The aim of the current study was to examine the perceptions of nurse and physician managers regarding facilitators, barriers, management role, responsibility, and action taken in the implementation of an eHealth intervention called Choice into clinical practice. Individual qualitative interviews were conducted with six nurses and three physicians in management positions at five hospital units. The findings revealed that nurse managers reported conscientiously supporting the implementation, but workloads prevented them from participating in the process as closely as they wanted. Physician managers reported less contribution. The implementation process was influenced by facilitating factors such as perceptions of benefits from Choice and use of implementation strategies, along with barriers such as physician resistance, contextual factors and difficulties for front-line providers in learning a new way of communicating with the patients. The findings suggest that role descriptions for both nurse and physician managers should include implementation knowledge and implementation skills. Managers could benefit from an implementation toolkit. Implementation management should be included in management education for healthcare managers to prepare them for the constant need for implementation and improvement in clinical practice.

  18. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  19. Statewide Adoption and Initial Implementation of Contingency Management for Substance Abusing Adolescents

    PubMed Central

    Chapman, Jason E.; Rowland, Melisa D.; Halliday-Boykins, Colleen A.; Randall, Jeff; Shackelford, Jennifer; Schoenwald, Sonja K.

    2008-01-01

    Four hundred and thirty-two public sector therapists attended a workshop in contingency management and were interviewed monthly for the following 6 months to assess their adoption and initial implementation of contingency management to treat substance abusing adolescent clients. Results showed that 58% of the practitioners (n = 131) with at least one substance abusing adolescent client (n = 225) adopted contingency management. Rates of adoption varied with therapist service sector (mental health versus substance abuse), educational background, professional experience, and attitudes toward treatment manuals and evidence-based practices. Competing clinical priorities and client resistance were most often reported as barriers to adopting contingency management, whereas unfavorable attitudes toward and difficulty in implementing contingency management were rarely cited as barriers. The fidelity of initial contingency management implementation among adopters was predicted by organizational characteristics as well as by several demographic, professional experience, attitudinal, and service sector characteristics. Overall, the findings support the amenability of public sector practitioners to adopt evidence-based practices and suggest that the predictors of adoption and initial implementation are complex and multifaceted. PMID:18665685

  20. Forrest Ranch Management and Implementation, Annual Report 2002-2003.

    SciTech Connect

    Smith, Brent

    2004-01-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  1. Implementation of an Anesthesia Information Management System in an Ambulatory Surgery Center.

    PubMed

    Mudumbai, Seshadri C

    2016-01-01

    Anesthesia information management systems (AIMS) are increasingly being implemented throughout the United States. However, little information exists on the implementation process for AIMS within ambulatory surgery centers (ASC). The objectives of this descriptive study are to document: 1) the phases of implementation of an AIMS at an ASC; and 2) lessons learnt from a socio-technical perspective. The ASC, within the Veterans Health Administration (VHA), has hosted an AIMS since 2008. As a quality improvement effort, we implemented a new version of the AIMS. This new version involved fundamental software changes to enhance clinical care such as real-time importing of laboratory data and total hardware exchange. The pre-implementation phase involved coordinated preparation over six months between multiple informatics teams along with local leadership. During this time, we conducted component, integration, and validation testing to ensure correct data flow from medical devices to AIMS and centralized databases. The implementation phase occurred in September 2014 over three days and was successful. Over the next several months, during post-implementation phase, we addressed residual items like latency of the application. Important lessons learnt from the implementation included the utility of partnering early with executive leadership; ensuring end user acceptance of new clinical workflow; continuous testing of data flow; use of a staged rollout; and providing additional personnel throughout implementation. Implementation of an AIMS at an ASC can utilize methods developed for large hospitals. However, issues unique to an ASC such as limited number of support personnel and distinctive workflows must be considered.

  2. Organizational Factors that Affect the Implementation of Information Technology: Perspectives of Middle Managers in Iran

    PubMed Central

    Barzekar, Hosein; Karami, Mahtab

    2014-01-01

    ABSTRACT Objective: to examine the organizational factors affecting the application of information technology in hospitals. Since the organizational factors are one of the most important determinants of successful projects, by understanding their impact and identifying them it can help planning a systematic IT implementation. Methods: In this cross-sectional descriptive study 110 middle managers were chosen from teaching hospitals. Structured questionnaire was used for the data collection. Results: There was a significant relationship between organization resource, organizational knowledge, process, management structure and values and goals with implementation of information technology. Conclusion: Findings showed that organizational factors had a considerable impact on implementation of information technology. Top managers must consider the important aspects of effective organizational factors. PMID:25568582

  3. Institutional pressures, dynamic capabilities and environmental management systems: investigating the ISO 9000--environmental management system implementation linkage.

    PubMed

    Zhu, Qinghua; Cordeiro, James; Sarkis, Joseph

    2013-01-15

    We hypothesize a model where domestic and international institutional pressures lead to the successful implementation of ISO 9000 and can in turn lead to the successful implementation of environmental management systems such as ISO 14001 environmental certification systems or total quality environmental management (TQEM) systems. Using appropriate tests for mediation with dichotomous mediators and outcomes, we find that the model holds for a sample of 377 Chinese manufacturers in six major industrial groups in Suzhou, Dalian, and Tianjin. Our findings are consistent with the theory linking internal capabilities to heterogeneous external (in this case, institutional) pressures on organizations for environmentally proactive efforts. Our findings suggest that institutions in developing countries with significant environmental concerns such as China as well as foreign suppliers and partners to firms in these countries should encourage and support ISO 9000 implementations by local firms. These findings may influence other developing nations' adoption of quality and environmental process systems.

  4. Institutional pressures, dynamic capabilities and environmental management systems: investigating the ISO 9000--environmental management system implementation linkage.

    PubMed

    Zhu, Qinghua; Cordeiro, James; Sarkis, Joseph

    2013-01-15

    We hypothesize a model where domestic and international institutional pressures lead to the successful implementation of ISO 9000 and can in turn lead to the successful implementation of environmental management systems such as ISO 14001 environmental certification systems or total quality environmental management (TQEM) systems. Using appropriate tests for mediation with dichotomous mediators and outcomes, we find that the model holds for a sample of 377 Chinese manufacturers in six major industrial groups in Suzhou, Dalian, and Tianjin. Our findings are consistent with the theory linking internal capabilities to heterogeneous external (in this case, institutional) pressures on organizations for environmentally proactive efforts. Our findings suggest that institutions in developing countries with significant environmental concerns such as China as well as foreign suppliers and partners to firms in these countries should encourage and support ISO 9000 implementations by local firms. These findings may influence other developing nations' adoption of quality and environmental process systems. PMID:23127965

  5. Implementing distress management guidelines in ambulatory oncology: a quality improvement project.

    PubMed

    Hammelef, Karen J; Friese, Christopher R; Breslin, Tara M; Riba, Michelle; Schneider, Susan M

    2014-01-01

    Distress assessment and referral to psychosocial services is an essential component of evidence-based oncologic nursing care. Oncology nurses have an opportunity to address patient distress needs through leadership of implementation programs and support for the positive outcomes that engaging in psychosocial services provides. This quality improvement project was conducted to evaluate the feasibility and utility of the National Comprehensive Cancer Network's distress management clinical practice guidelines in ambulatory oncology. A theoretical framework guided the process design that included staff education, screening, and management in a cohort implementation project with historical control. PMID:24480661

  6. Emergency Implementation of Knowledge Management System to Support a Bioterrorism Response

    PubMed Central

    Garrett, Nedra; Yasnoff, William A.; Kumar, Vibha

    2003-01-01

    In a public health emergency, it becomes necessary for public health agencies to provide timely, accurate and useful information to the community. During the anthrax attacks, the Public Health Practice Program Office in the Centers for Disease Control and Prevention implemented a knowledge management (KM) system to respond to an increased number of inquiries from public health officials, first responders, and health care professionals as well as the general public. While it is possible to successfully implement a knowledge management system quickly in a crisis situation, additional challenges to sustainability may result from shortchanging the normal decision-making channels. PMID:14728354

  7. Managerial attitude to the implementation of quality management systems in Lithuanian support treatment and nursing hospitals

    PubMed Central

    Buciuniene, Ilona; Malciankina, Sonata; Lydeka, Zigmas; Kazlauskaite, Ruta

    2006-01-01

    Background The regulations of the Quality Management System (QMS) implementation in health care organizations were approved by the Lithuanian Ministry of Health in 1998. Following the above regulations, general managers of health care organizations had to initiate the QMS implementation in hospitals. As no research on the QMS implementation has been carried out in Lithuanian support treatment and nursing hospitals since, the objective of this study is to assess its current stage from a managerial perspective. Methods A questionnaire survey of general managers of Lithuanian support treatment and nursing hospitals was carried out in the period of January through March 2005. Majority of the items included in the questionnaire were measured on a seven-point Likert scale. During the survey, a total of 72 questionnaires was distributed, out of which 58 filled-in ones were returned (response rate 80.6 per cent; standard sampling error 0.029 at 95 per cent level of confidence). Results Quality Management Systems were found operating in 39.7 per cent of support treatment and nursing hospitals and currently under implementation in 46.6 per cent of hospitals (13.7% still do not have it). The mean of the respondents' perceived QMS significance is 5.8 (on a seven-point scale). The most critical issues related to the QMS implementation include procedure development (5.5), lack of financial resources (5.4) and information (5.1), and development of work guidelines (4.6), while improved responsibility and power sharing (5.2), better service quality (5.1) and higher patient satisfaction (5.1) were perceived by the respondents as the key QMS benefits. The level of satisfaction with the QMS among the management of the surveyed hospitals is mediocre (3.6). However it was found to be higher among respondents who were more competent in quality management, were familiar with ISO 9000 standards, and had higher numbers of employees trained in quality management. Conclusion QMSs are

  8. Implementing and Evaluating a Multicomponent Inpatient Diabetes Management Program: Putting Research into Practice

    PubMed Central

    Munoz, Miguel; Pronovost, Peter; Dintzis, Joanne; Kemmerer, Theresa; Wang, Nae-Yuh; Chang, Yi-Ting; Efird, Leigh; Berenholtz, Sean M.; Golden, Sherita Hill

    2013-01-01

    Background Strategies for successful implementation of hospitalwide glucose control efforts were addressed in a conceptual model for the development and implementation of an institutional inpatient glucose management program. Conceptual Model Components The Glucose Steering Committee incrementally developed and implemented hospitalwide glucose policies, coupled with targeted education and clinical decision support to facilitate policy acceptance and uptake by staff while incorporating process and outcome measures to objectively assess the effectiveness of quality improvement efforts. The model includes four components: (1) engaging staff and hospital executives in the importance of inpatient glycemic management, (2) educating staff involved in the care of patients with diabetes through structured knowledge dissemination, (3) executing evidence-based inpatient glucose management through development of policies and clinical decision aids, and (4) evaluating intervention effectiveness through assessing process measures, intermediary glucometric outcomes, and clinical and economic outcomes. An educational curriculum for nursing, provider, and pharmacist diabetes education programs and current glucometrics were also developed. Outcomes Overall the average patient-day–weighted mean blood glucose (PDWMBG) was below the currently recommended maximum of 180 mg/dL in patients with diabetes and hyperglycemia, with a significant decrease in PDWMBG of 7.8 mg/dL in patients with hyperglycemia. The program resulted in an 18.8% reduction in hypoglycemia event rates, which was sustained. Conclusion Inpatient glucose management remains an important area for patient safety, quality improvement, and clinical research, and the implementation model should guide other hospitals in their glucose management initiatives. PMID:22649859

  9. Improving the implementation of evidence-based practice: a knowledge management perspective.

    PubMed

    Sandars, John; Heller, Richard

    2006-06-01

    Experience of knowledge management initiatives in non-health care organizations can offer useful insights, and strategies, to implement evidence-based practice in health care. Knowledge management offers a structured process for the generation, storage, distribution and application of knowledge in organizations. This includes both tacit knowledge (personal experience) and explicit knowledge (evidence). Communities of practice are a key component of knowledge management and have been recognized to be essential for the implementation of change in organizations. It is within communities of practice that tacit knowledge is actively integrated with explicit knowledge. Organizational factors that limit the development of knowledge management, including communities of practice, in non-health care organizations need to be overcome if the potential is to be achieved within health care.

  10. Best practices of total quality management implementation in health care settings.

    PubMed

    Talib, Faisal; Rahman, Zillur; Azam, Mohammed

    2011-01-01

    Due to the growing prominence of total quality management (TQM) in health care, the present study was conducted to identify the set of TQM practices for its successful implementation in healthcare institutions through a systematic review of literature. A research strategy was performed on the selected papers published between 1995 and 2009. An appropriate database was chosen and 15 peer-reviewed research papers were identified through a screening process and were finally reviewed for this study. Eight supporting TQM practices, such as top-management commitment, teamwork and participation, process management, customer focus and satisfaction, resource management, organization behavior and culture, continuous improvement, and training and education were identified as best practices for TQM implementation in any health care setting. The article concludes with a set of recommendations for the future researchers to discuss, develop, and work upon in order to achieve better precision and generalizations.

  11. The process of implementing an ISO 9001 quality management system in a school of nursing.

    PubMed

    Lett, M

    2000-01-01

    This paper documents the process undertaken during the establishment of an ISO 9000 series quality management system by a School of Nursing. Further discussion centres around the reasons why an ISO quality management system was implemented, the lessons learnt during the process and the benefits that accreditation has brought to the School of Nursing. The lessons learnt during the process could be of help to other organisations wishing to achieve a similar accreditation status.

  12. Implementing an environmental management system on an oilfield operation in Sumatra

    SciTech Connect

    Kosasih, A.; Shobirin, M.

    1995-01-01

    Given the progressively increasing level of government and public environmental awareness, environmental management has emerged as a key component in the overall management of hydrocarbon exploration, development, and production. This paper examines how Lasmo Oil (Malacca Strait) Ltd. (LOMSL) has set up and implemented its environmental management system to comply with Indonesian regulatory requirements and to understand and deal with environmental and community issues proactively in its areas of operation. Initiated in 1989, the current achievements of the LOMSL are described. The results show that by setting up an environmental management system and positively implementing a comprehensive environmental management program, LOMSL has managed to solve its major environmental problems. The authors found that to establish and to maintain a satisfactory level of environmental performance, broad-ranging consideration must be given to aspects of a regulatory and institutional, socioeconomic, and ecological nature. Management commitment and participation is also identified as essential if a sustained level of high-quality environmental management is to be achieved.

  13. Disseminating contingency management: Impacts of staff training and implementation at an opiate treatment program

    PubMed Central

    Hartzler, Bryan; Jackson, T. Ron; Jones, Brinn E.; Beadnell, Blair; Calsyn, Donald A.

    2014-01-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (intervention cost, feasibility, and sustainability) were assessed at study conclusion in a qualitative interview with OTP management. Intervention effectiveness was also assessed via independent chart review of trial CM implementation vs. a historical control period. Results included: 1) robust, durable increases in delivery skill, knowledge, and adoption readiness among trained staff; 2) positive managerial perspectives of intervention cost, feasibility, and sustainability; and 3) significant clinical impacts on targeted patient indices. Collective results offer support for the study’s collaborative intervention design and the applied, skills-based focus of staff training processes. Implications for CM dissemination are discussed. PMID:24462242

  14. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    ERIC Educational Resources Information Center

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  15. Hazardous Materials Management Technology Programs. National Voluntary Skills Standard. Implementation Guide.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    This implementation guide is intended to help educators use the Skills Standard for Hazardous Materials Management Technology (HMMT). It begins with a description of HMMT and a summary of the 13 job functions of the standard. Within each job function are supporting skills and knowledge that an HMMT worker must possess to be able to accomplish the…

  16. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... (ORCA), and Excluded Parties List System (EPLS) databases into the System for Award Management (SAM) database. DATES: Effective Date: July 22, 2013. FOR FURTHER INFORMATION CONTACT: Mr. Curtis E. Glover, Sr... database. Upon implementation, the pre- existing applications were retired, and all requirements for...

  17. 75 FR 16486 - Proposed Comment Request for Review of ACF Disaster Case Management Implementation Guide; Office...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    .../her advocate and help him/ her organize and access disaster-related resources, human services, health... HUMAN SERVICES Administration for Children and Families Proposed Comment Request for Review of ACF Disaster Case Management Implementation Guide; Office of Human Services Emergency Preparedness and...

  18. Statewide Adoption and Initial Implementation of Contingency Management for Substance-Abusing Adolescents

    ERIC Educational Resources Information Center

    Henggeler, Scott W.; Chapman, Jason E.; Rowland, Melisa D.; Halliday-Boykins, Colleen A.; Randall, Jeff; Shackelford, Jennifer; Schoenwald, Sonja K.

    2008-01-01

    Four hundred thirty-two public sector therapists attended a workshop in contingency management (CM) and were interviewed monthly for the following 6 months to assess their adoption and initial implementation of CM to treat substance-abusing adolescent clients. Results showed that 58% (n = 131) of the practitioners with at least one…

  19. Implementing a Quality Management Framework in a Higher Education Organisation: A Case Study

    ERIC Educational Resources Information Center

    O'Mahony, Kim; Garavan, Thomas N.

    2012-01-01

    Purpose: This paper aims to report and analyse the lessons learned from a case study on the implementation of a quality management system within an IT Division in a higher education (HE) organisation. Design/methodology/approach: The paper is based on a review of the relevant literatures and the use of primary sources such as document analysis,…

  20. Communication Channels as Implementation Determinants of Performance Management Framework in Kenya

    ERIC Educational Resources Information Center

    Sang, Jane

    2016-01-01

    The purpose of this study to assess communication channels as implementation determinants of performance management framework In Kenya at Moi Teaching and Referral Hospital (MTRH). The communication theory was used to inform the study. This study adopted an explanatory design. The target sampled 510 respondents through simple random and stratified…

  1. Implementation of a UNIX-Based Network Management System for English Instruction.

    ERIC Educational Resources Information Center

    Schmitt, Lothar M.; Christianson, Kiel T.

    Pedagogical features and implementation of a UNIX-based management system (UNIEM) designed to support the instructor in teaching English as a second language using a network of workstations are described. The application discussed here is for teaching English composition to students at the University of Aizu (Japan). UNIEM is constructed to assist…

  2. The Development and Implementation of a Diversity Management Curriculum: Organizational Change through Exploration and Exploitation

    ERIC Educational Resources Information Center

    Danowitz, Mary Ann; Hanappi-Egger, Edeltraud; Hofmann, Roswitha

    2009-01-01

    Purpose: The purpose of this paper is to provide concepts and strategies to successfully introduce and implement curricular change; especially, related to incorporating diversity management into academic programs. Design/methodology/approach: Utilizing documents and accounts from two agents involved in the change process and an outside observer,…

  3. Towards a Conceptual Model of the Implementation of Management and Planning Systems in Schools.

    ERIC Educational Resources Information Center

    Levine, Donald M.

    This paper considers conceptual alternatives for the development of information systems for management and planning in schools. Four problem areas which have been encountered in the introduction and implementation of such systems are identified, including lack of information, lack of understanding, lack of tools for the redress of problems, and…

  4. A Model of Evaluation Planning, Implementation and Management toward a "Culture of Information" within Organizations.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    The argument underlying the ongoing paradigm shift from logical-positivism to constructionism is briefly outlined. A model of evaluation planning, implementation, and management (the P-I-M model) is then presented, which assumes a complementarity between the two paradigms. The P-I-M Model includes three components of educational evaluation: a…

  5. Decentralization and Participatory Decision-Making: Implementing School-Based Management in the Abbott Districts.

    ERIC Educational Resources Information Center

    Walker, Elaine M.

    2000-01-01

    This study examined issues faced during implementation of school-based management (SBM) in New Jersey's special needs or Abbott districts, using a literature review, surveys of K-12 schools, and focus groups with central office administrators. The study examined forms of SBM, team operations, local autonomy versus state power, skills required to…

  6. Activity-Based Management System Implementation in Higher Education Institution: Benefits and Challenges

    ERIC Educational Resources Information Center

    Ismail, Noor Azizi

    2010-01-01

    Purpose: The purpose of this paper is to discuss how activity-based costing (ABC) technique can be applied in the context of higher education institutions. It also discusses the obstacles and challenges to the successful implementation of activity-based management (ABM) in the higher education environment. Design/methodology/approach: This paper…

  7. A Bachelor of Engineering Technology Curriculum in Water Quality Management: Program Implementation.

    ERIC Educational Resources Information Center

    Cole, Charles A.; And Others

    Contained are summaries of support courses for a Bachelor of Engineering Technology (BET) Curriculum in Water Quality Management. Suggested courses in this volume include: math, physics, English, drafting, mechanics, civil engineering, and economics. Also included are self-appraisal suggestions for institutions considering implementation of this…

  8. From sacred cows to sacrificial lambs: implementing agricultural phosphorus science and management to combat eutrophication

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Experience with implementing agricultural phosphorus (P) strategies highlights successes and uncertainty over outcomes. We examine case studies from the USA, UK, and Sweden to examine P management under voluntary, litigated and regulatory settings. In the USA, voluntary strategies to curtail P loadi...

  9. Implementing Experiential Action Learning in International Management Education: The Global Business Strategic (GLOBUSTRAT) Consulting Program

    ERIC Educational Resources Information Center

    Kamath, Shyam; Agrawal, Jagdish; Krickx, Guido

    2008-01-01

    This paper discusses the theoretical foundations and implementation challenges and outcomes of a unique "hands-on" global consulting program that is integrated into an international EMBA program for mid-career and senior American and European managers. It details the challenges for the integration of experiential action learning, double-loop…

  10. Importance of the Primary Radioactivity Standard Laboratory and Implementation of its Quality Management

    NASA Astrophysics Data System (ADS)

    Sahagia, Maria; Razdolescu, Anamaria Cristina; Luca, Aurelian; Ivan, Constantin

    2007-04-01

    The paper presents some specific aspects of the implementation of the quality management in the Radionuclide Metrology Laboratory, from IFIN-HH, the owner of the primary Romanian standard in radioactivity. The description of the accreditation, according to the EN ISO/IEC 17025:2005, is presented.

  11. Career and Life Management for Senior High School. Guide to Implementation.

    ERIC Educational Resources Information Center

    Alberta Learning, Edmonton.

    This guide is intended to assist teachers with implementation of the prescribed outcomes in the "Program of Studies for Career and Life Management (CALM)" (2002). The goal of this program is to enable students to make well informed, considered decisions and choices in all aspects of their lives, and to develop behaviors and attitudes that…

  12. 33 CFR 151.1512 - Implementation schedule for approved ballast water management methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Implementation schedule for approved ballast water management methods. 151.1512 Section 151.1512 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL...

  13. 33 CFR 151.2035 - Implementation schedule for approved ballast water management methods.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Implementation schedule for approved ballast water management methods. 151.2035 Section 151.2035 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL...

  14. 33 CFR 151.2035 - Implementation schedule for approved ballast water management methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Implementation schedule for approved ballast water management methods. 151.2035 Section 151.2035 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL...

  15. 33 CFR 151.1512 - Implementation schedule for approved ballast water management methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Implementation schedule for approved ballast water management methods. 151.1512 Section 151.1512 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL...

  16. Role of external management consultants in health-care organizations implementing TQM.

    PubMed

    Badrick, Tony C; Preston, Arthur P

    2002-01-01

    The reliance of organizations on consultants generally is increasing. Although the efficacy of the use of consultants in implementing change programs has been questioned, there have been limited attempts to systematically analyze the contribution of consultants. This article reports observations on the use of consultants in health-care organizations implementing total quality management (TQM). The relationship between the use of external management consultants and successful TQM implementation is not simple. There appears to be a difference in the way consultants are used by the public and private sectors, with the private organizations forming long-term relationships with their consultants. The perceived value of consultants to the private organizations was higher. Consultants are not a substitute for leadership, and the success of outside consultants probably depends on the commitment of senior management. External management consultants appeared to be linked to the successful implementation of TQM. Further, despite the conventional wisdom to the contrary, some prepackaged programs may be beneficial for the introduction of TQM into an organization.

  17. Total Quality Management on Campus: Implementation, Experiences, and Observations. ASHE Annual Meeting Paper.

    ERIC Educational Resources Information Center

    Freed, Jann E.; And Others

    A national survey of higher education institutions that have adopted Total Quality Management sought to document their implementation, principles, and results. The study developed and pre-tested a questionnaire which was then sent to 408 institutions. With a reminder post-card and a second mailing the total response rate was 67 percent or 168…

  18. Asthma Management in Educational Settings: Implementing Guideline-Based Care in Washington State Schools.

    PubMed

    Evans-Agnew, Robin A; Klein, Nicole; Lecce, Sally

    2015-11-01

    Managing asthma in the schools is complex and requires careful planning. This article highlights key steps in implementing guideline-based care for children with asthma in Washington State schools: assessing students, establishing acuity, communicating with parents, and training staff. Advance planning can improve outcomes for students, parents, and school staff in managing this complex and prevalent disease. NASN recently developed asthma management guidelines. Developing state-specific guidelines provides an opportunity to speak specifically to state laws and nurse practice acts while also reinforcing the importance of specialized practice to school nurses, school administrators and teachers, parents, and students. PMID:26515566

  19. Aiding the environment: the Australian Development Agency's experience of implementing an environmental management system

    SciTech Connect

    Keen, Meg . E-mail: meg.keen@anu.edu.au; Sullivan, Marjorie

    2005-08-15

    Aid agencies, like commercial businesses, are increasingly concerned with incorporating sound environmental management into their operations. Different approaches are being used to integrate sustainability into development assistance to ensure that environmental impacts are assessed and managed. One approach being used by AusAID, the Australian aid agency, is to implement an environmental management system (EMS) across program and project areas. This paper examines how AusAID has adapted the EMS approach to suit aid agency operations, and some of the lessons from the Australian experience.

  20. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    NASA Astrophysics Data System (ADS)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  1. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  2. Chronic disease management: implementation and coordination of healthcare systems for depressed elderly persons.

    PubMed

    Severinsson, Elisabeth; Holm, Anne Lise

    2014-12-01

    The aim of this study was to evaluate the implementation of the research-based Chronic Care Model (CCM), discuss methods and summarise research recommendations for improving the care of depressed elderly persons. Interviews were conducted and state-of-the-art reviews employed. Three important areas emerged: (1) barriers to and facilitating factors in the implementation of the CCM; (2) the challenges involved in re-designing the delivery system and interdisciplinary team collaboration; and (3) empirical evidence pertaining to self-management support and how older persons manage to live with depressive ill-health. In conclusion, implementation research requires evidence-based knowledge, staff involvement and familiarity with the context in which development occurs.

  3. Modeling the leadership attributes of top management in green innovation implementation

    NASA Astrophysics Data System (ADS)

    Ishak, Noormaizatul Akmar; Ramli, Mohammad Fadzli

    2015-05-01

    The implementation of green innovation in the companies is the interest of the governments all over the world. This has been the main focus of the Copenhagen Protocol and Kyoto Protocol that require all governments to preserve the nature through green initiatives. This paper proposes a mathematical model on the leadership attributes of the top management in ensuring green innovation implementation in their companies' strategies to reduce operational cost. With green innovation implementation in the Government-Linked Companies (GLCs), we identify the leadership attributes are tied up to the leadership style of the top managers in the companies. Through this model we have proved that green type leadership always contributes better in cost saving, therefore it is a more efficient leadership attribute for the GLCs especially.

  4. Implementing a Clinical Research Management System: One Institution's Successful Approach Following Previous Failures.

    PubMed

    Campion, Thomas R; Blau, Vanessa L; Brown, Scott W; Izcovich, Daniel; Cole, Curtis L

    2014-01-01

    Clinical research management systems (CRMSs) can facilitate research billing compliance and clinician awareness of study activities when integrated with practice management and electronic health record systems. However, adoption of CRMSs remains low, and optimal approaches to implementation are unknown. This case report describes one institution's successful approach to organization, technology, and workflow for CRMS implementation following previous failures. Critical factors for CRMS success included organizational commitment to clinical research, a dedicated research information technology unit, integration of research data across disparate systems, and centralized system usage workflows. In contrast, previous failed approaches at the institution lacked a mandate and mechanism for change, received support as a business rather than research activity, maintained data in separate systems, and relied on inconsistent distributed system usage workflows. To our knowledge, this case report is the first to describe CRMS implementation success and failures, which can assist practitioners and academic evaluators.

  5. Development and Implementation of Critical Loads for Atmospheric Deposition: Federal Land Management Implications

    NASA Astrophysics Data System (ADS)

    Porter, E. M.

    2004-12-01

    Critical loads for atmospheric deposition have been widely developed and used in Europe, Canada, and other countries. Critical loads are used to influence air pollution emissions reductions, thereby protecting and restoring aquatic and terrestrial ecosystems. In the United States, federal land management agencies are adopting the critical load concept as a potentially valuable resource management tool. Certain parks and wilderness areas are currently being affected by anthropogenic nitrogen and sulfur deposition. Effects of excess deposition include acidification, nitrogen enrichment, toxicity, and changes in biotic communities. Streams in both Shenandoah and Great Smoky Mountains National Parks are experiencing chronic and episodic acidification and brook trout fisheries in Shenandoah have been affected. High elevation ecosystems in Rocky Mountain National Park are undergoing subtle changes in aquatic and terrestrial ecosystems attributable to atmospheric deposition. Natural resources in many other federal areas have been affected or are at risk from deposition. Federal land managers are refining strategies for critical loads that include working with scientists to identify resources sensitive to deposition, defining resource protection criteria that will meet management objectives, and estimating and implementing critical loads. Critical loads will be used in resource management decisions and federal land management planning. They will be used to evaluate management actions and assess progress towards meeting management goals. Federal land managers will also communicate critical loads information to air pollution regulatory agencies to inform emissions management strategies for clean air.

  6. Selecting a Course Management System: Selecting and Implementing a Course Management System

    ERIC Educational Resources Information Center

    Mandernach, B. Jean; Donnelli-Sallee, Emily; Dailey-Hebert, Amber

    2006-01-01

    Institutions of higher education are embracing the role of the Internet as a medium to promote on-demand communication between faculty and students. As such, online course management systems have become an efficient and effective means of facilitating learning outside the classroom. To ensure that a course management system meets the needs and…

  7. The Vortex: a universal 'high-acuity implementation tool' for emergency airway management.

    PubMed

    Chrimes, N

    2016-09-01

    Factors influencing performance during emergency airway management can be broadly divided into issues with preparation and those with implementation. Effective design of resources that provide guidance on management requires consideration of the context in which they are to be used. Many of the major airway guidelines do not specify whether they are intended to be used during preparation or implementation and may not take the context for use into account in their design. This can produce tools which may be not only ineffective but actively disruptive to team function in an emergency. The Vortex is a novel, simple, and predominantly visually based cognitive aid, which has been specifically designed to be used in real time during airway emergencies to support team function and target recognized failings in airway crisis management. Unlike the major algorithms, which are context specific, the Vortex is flexible enough for the same tool to be applied to any circumstance in which airway management takes place, independent of context, patient type, or the intended airway device. This makes the same tool suitable for use by emergency physicians, intensivists, paramedical staff, and anaesthetists. The Vortex contains many of the recognized features of an ideal cognitive tool and may be effective in reducing implementation errors in emergency airway management. Experimental evidence is required to establish this. PMID:27440673

  8. Design, development and microwave inter-comparison of dual slot antenna configurations for localized hepatic tumor management.

    PubMed

    Zafa, J; Zafa, T; Zafa, H; Sharif, F

    2015-12-01

    Slot antennas are generally preferred for localized liver cancer treatment modalities due to desired radiation characteristics. An iterative thermal/microwave numerical routine is used to analyze regular and miniature slot antenna configurations at 5.8 GHz. A thermal/microwave solver determines the specific absorption rate to malignant tissues as a pre- processing step to compute microwave solution in terms of propagation wave number, return loss and insertion loss. The regular and miniature dual slots antenna geometries were then developed to estimate the return loss characteristics against antennas slot lengths at a constant frequency of 5.8 GHz. Results reveal that the regular geometry has return loss less than -5 dB as compared to <-25 dB return loss for miniature slot antenna configuration. Furthermore, 5.8 GHz antenna geometry provides physical size reduction up to 50 %, lower fabrication cost and is a better minimally invasive choice due to further packed thermal ablation spots. PMID:26467919

  9. Software management and implementation plan for the Microwave Limb Sounder (MLS) carried on a NASA Earth Observing System (EOS) satellite

    NASA Technical Reports Server (NTRS)

    Shaw, H. Y.; Girard, M. A.; Perun, V. S.; Sherif, J. S.

    2003-01-01

    This paper presents a Software Management and Implementation Plan (SIMP) for managing and controlling the development of the Microwave Limb Sounder (MLS) instrument software, and the Instrument Ground Support Equipment (IGSE) software.

  10. The role of organizational culture and leadership in water safety plan implementation for improved risk management.

    PubMed

    Summerill, Corinna; Pollard, Simon J T; Smith, Jennifer A

    2010-09-15

    Appropriate implementation of WSPs offers an important opportunity to engage in and promote preventative risk management within water utilities. To ensure success, the whole organization, especially executive management, need to be advocates. Illustrated by two case studies, we discuss the influence of organizational culture on buy-in and commitment to public health protection and WSPs. Despite an internal desire to undertake risk management, some aspects of organizational culture prevented these from reaching full potential. Enabling cultural features included: camaraderie; competition; proactive, involved leaders; community focus; customer service mentality; transparency; accountability; competent workforce; empowerment; appreciation of successes, and a continual improvement culture. Blocking features included: poor communication; inflexibility; complacency; lack of awareness, interest or reward and coercion. We urge water utilities to consider the influence of organizational culture on the success and sustainability of WSP adoption, and better understand how effective leadership can mould culture to support implementation.

  11. Grade Configuration

    ERIC Educational Resources Information Center

    Williamson, Ronald

    2012-01-01

    Where to locate the 7th and 8th grade is a perennial question. While there are many variations, three approaches are most often used---include them in a 7-12 secondary campus, maintain a separate middle grades campus, or include them as part of a K-8 program. Research says that grade configuration is inconclusive at best and there is no research…

  12. Fingernail Configuration

    PubMed Central

    Jung, Jin Woo; Shin, Jun Ho; Kwon, Yu Jin; Hwang, Jae Ha; Lee, Sam Yong

    2015-01-01

    Background A number of conditions can alter a person's fingernail configuration. The ratio between fingernail width and length (W/L) is an important aesthetic criterion, and some underlying diseases can alter the size of the fingernail. Fingernail curvature can be altered by systemic disorders or disorders of the fingernail itself. Although the shape and curvature of the fingernail can provide diagnostic clues for various diseases, few studies have precisely characterized normal fingernail configuration. Methods We measured the W/L ratio of the fingernail, transverse fingernail curvature, hand length, hand breadth, and distal interphalangeal joint width in 300 volunteers with healthy fingernails. We also investigated whether age, sex, height, and handedness influenced the fingernail W/L ratio and transverse fingernail curvature. Results In women, fingernail W/L ratios were similar across all five fingers, and were lower than those in men. The highest value of transverse fingernail curvature was found in the thumb, followed by the index, middle, ring, and little fingers. Handedness and aging influenced transverse fingernail curvature, but not the fingernail W/L ratio. Fingernails were flatter on the dominant hand than on the non-dominant hand. The radius of transverse fingernail curvature increased with age, indicating that fingernails tended to flatten with age. Conclusions Our quantitative data on fingernail configuration can be used as a reference range for diagnosing various diseases and deformities of the fingernail, and for performing reconstructive or aesthetic fingernail surgery. PMID:26618124

  13. Implementation of an Anesthesia Information Management System in an Ambulatory Surgery Center.

    PubMed

    Mudumbai, Seshadri C

    2016-01-01

    Anesthesia information management systems (AIMS) are increasingly being implemented throughout the United States. However, little information exists on the implementation process for AIMS within ambulatory surgery centers (ASC). The objectives of this descriptive study are to document: 1) the phases of implementation of an AIMS at an ASC; and 2) lessons learnt from a socio-technical perspective. The ASC, within the Veterans Health Administration (VHA), has hosted an AIMS since 2008. As a quality improvement effort, we implemented a new version of the AIMS. This new version involved fundamental software changes to enhance clinical care such as real-time importing of laboratory data and total hardware exchange. The pre-implementation phase involved coordinated preparation over six months between multiple informatics teams along with local leadership. During this time, we conducted component, integration, and validation testing to ensure correct data flow from medical devices to AIMS and centralized databases. The implementation phase occurred in September 2014 over three days and was successful. Over the next several months, during post-implementation phase, we addressed residual items like latency of the application. Important lessons learnt from the implementation included the utility of partnering early with executive leadership; ensuring end user acceptance of new clinical workflow; continuous testing of data flow; use of a staged rollout; and providing additional personnel throughout implementation. Implementation of an AIMS at an ASC can utilize methods developed for large hospitals. However, issues unique to an ASC such as limited number of support personnel and distinctive workflows must be considered. PMID:26537130

  14. Line manager implementation perceptions as a mediator of relations between high-performance work practices and employee outcomes.

    PubMed

    Sikora, David M; Ferris, Gerald R; Van Iddekinge, Chad H

    2015-11-01

    Strategic human resources management (SHRM) scholars recently have suggested that high-performance work practices (HPWP) implementation might serve as a critical mediator between HPWP and workplace outcomes. This study proposes and tests a model that positions line managers' perceptions regarding the extent to which they implement their organization's HPWP as a mediator of relations between HPWP and employee attitudes (i.e., turnover intentions and participative decision-making perceptions) and behavior (i.e., job performance). Using data from 507 line managers and 109 matched line manager-subordinate response sets, the results suggest that line managers' HPWP implementation perceptions fully mediate relations between HPWP and employee outcomes. The authors also found that line managers' human resources competency and political skill affect their HPWP implementation perceptions. Overall, these findings contribute to a more informed understanding of relationships between HPWP and work outcomes and suggest that additional SHRM research is needed to better understand whether and how HPWP are implemented. PMID:26011722

  15. The value of forage measurement information in rangeland management. [implementation of satellite data in range management

    NASA Technical Reports Server (NTRS)

    Lietzke, K. R.

    1975-01-01

    An economic model and simulation are developed to estimate the potential social benefit arising from the use of alternative measurement systems in rangeland management. In order to estimate these benefits, it was necessary to model three separate systems: the range environment, the rangeland manager, and the information system which links the two. The rancher's decision-making behavior is modeled according to sound economic principles. Results indicate substantial potential benefits, particularly when used in assisting management of government-operated ranges; possible annual benefits in this area range from $20 to $46 million, depending upon the system capabilities assumed. Possible annual benefit in privately-managed stocker operations range from $2.8 to $49.5 million, depending upon where actual rancher capabilities lie and what system capabilities are assumed.

  16. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice.

  17. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice. PMID:27557021

  18. Design and Implementation of an Interdisciplinary Marketing/Management Course on Technology and Innovation Management

    ERIC Educational Resources Information Center

    Athaide, Gerard A.; Desai, Harsha B.

    2005-01-01

    Given increasing industry demand for integrative learning, marketing curricula need to emphasize interdisciplinary approaches to teaching. Although team teaching is a useful method for achieving cross-functional integration, there are very few frameworks for effectively implementing team teaching. Consequently, marketing educators seeking to offer…

  19. Systematic Work Environment Management: experiences from implementation in Swedish small-scale enterprises.

    PubMed

    Gunnarsson, Kristina; Andersson, Ing-Marie; Rosén, Gunnar

    2010-01-01

    Small-scale enterprises face difficulties in fulfilling the regulations for organising Systematic Work Environment Management. This study compared three groups of small-scale manufacturing enterprises with and without support for implementing the provision. Two implementation methods, supervised and network method, were used. The third group worked according to their own ideas. Twenty-three enterprises participated. The effects of the implementation were evaluated after one year by semi-structured dialogue with the manager and safety representative. Each enterprise was classified on compliance with ten demands concerning the provision. The work environment was estimated by the WEST-method. Impact of the implementation on daily work was also studied. At the follow-up, the enterprises in the supervised method reported slightly more improvements in the fulfilment of the demands in the provision than the enterprises in the network method and the enterprises working on their own did. The effect of the project reached the employees faster in the enterprises with the supervised method. In general, the work environment improved to some extent in all enterprises. Extensive support to small-scale enterprises in terms of advise and networking aimed to fulfil the regulations of Systematic Work Environment Management had limited effect - especially considering the cost of applying these methods.

  20. Implementing a genomic data management system using iRODS in the Wellcome Trust Sanger Institute

    PubMed Central

    2011-01-01

    Background Increasingly large amounts of DNA sequencing data are being generated within the Wellcome Trust Sanger Institute (WTSI). The traditional file system struggles to handle these increasing amounts of sequence data. A good data management system therefore needs to be implemented and integrated into the current WTSI infrastructure. Such a system enables good management of the IT infrastructure of the sequencing pipeline and allows biologists to track their data. Results We have chosen a data grid system, iRODS (Rule-Oriented Data management systems), to act as the data management system for the WTSI. iRODS provides a rule-based system management approach which makes data replication much easier and provides extra data protection. Unlike the metadata provided by traditional file systems, the metadata system of iRODS is comprehensive and allows users to customize their own application level metadata. Users and IT experts in the WTSI can then query the metadata to find and track data. The aim of this paper is to describe how we designed and used (from both system and user viewpoints) iRODS as a data management system. Details are given about the problems faced and the solutions found when iRODS was implemented. A simple use case describing how users within the WTSI use iRODS is also introduced. Conclusions iRODS has been implemented and works as the production system for the sequencing pipeline of the WTSI. Both biologists and IT experts can now track and manage data, which could not previously be achieved. This novel approach allows biologists to define their own metadata and query the genomic data using those metadata. PMID:21906284

  1. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey

    PubMed Central

    2013-01-01

    Background Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Methods Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Results Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users’ low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Conclusion Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative

  2. [The implementation of a quality management tool at a university hospital].

    PubMed

    Pertence, Poliana Prioste; Melleiro, Marta Maria

    2010-12-01

    The objective of this study was to understand the perception of a multidisciplinary health team regarding the implementation of a quality management took at a teaching hospital. The setting of this qualitative study was the University Hospital at University of São Paulo (HU-USP). Participants were seven workers from the Committee for the Implementation of the 5S Program. Data collection was performed through semi-structured interviews and the statements were analyzed according to Janesick. Two categories emerged from the statements: The perception of the multidisciplinary team participating in the implementation of the 5S Program and Factors that affect the implementation of the 5S Program. The categories were interpreted following the Donabedian framework. This study permitted to understand the perception of the multidisciplinary team regarding the implementation of a quality management tool. It is believed that the present findings will contribute with evaluating the 5S Program at the HU-USP, and provide the necessary support for reorganizing activities at that hospital. PMID:21337786

  3. Environmental management practices in the Lebanese pharmaceutical industries: implementation strategies and challenges.

    PubMed

    Massoud, May A; Makarem, N; Ramadan, W; Nakkash, R

    2015-03-01

    This research attempts to provide an understanding of the Lebanese pharmaceutical industries' environmental management strategies, priorities, and perceptions as well as drivers, barriers, and incentives regarding the implementation of the voluntary ISO 14001 Environmental Management System. Accordingly, a semistructured in-depth interview was conducted with the pharmaceutical industries. The findings revealed a significant lack of knowledge about the standard among the industries. The main perceived drivers for adopting the ISO 14001 are improving the companies' image and overcoming international trade. The main perceived barriers for acquiring the standard are the lack of government support and the fact that ISO 14001 is not being legally required or enforced by the government. Moreover, results revealed that adopting the ISO 14001 standard is not perceived as a priority for the Lebanese pharmaceutical industries. Although the cost of certification was not considered as a barrier for the implementation of ISO 14001, the majority of the pharmaceutical industries are neither interested nor willing to adopt the Standard if they are not exposed to any regulatory pressure or external demand. They are more concerned with quality and safety issues with the most adopted international standard among the industries being the ISO 9001 quality management system. This study highlights the aspect that financial barriers are not always the hurdles for implementing environmental management strategies in developing countries and underscores the need for regulatory frameworks and enforcement.

  4. Decentralized water resources management in Mozambique: Challenges of implementation at the river basin level

    NASA Astrophysics Data System (ADS)

    Inguane, Ronaldo; Gallego-Ayala, Jordi; Juízo, Dinis

    In the context of integrated water resources management implementation, the decentralization of water resources management (DWRM) at the river basin level is a crucial aspect for its success. However, decentralization requires the creation of new institutions on the ground, to stimulate an environment enabling stakeholder participation and integration into the water management decision-making process. In 1991, Mozambique began restructuring its water sector toward operational decentralized water resources management. Within this context of decentralization, new legal and institutional frameworks have been created, e.g., Regional Water Administrations (RWAs) and River Basin Committees. This paper identifies and analyzes the key institutional challenges and opportunities of DWRM implementation in Mozambique. The paper uses a critical social science research methodology for in-depth analysis of the roots of the constraining factors for the implementation of DWRM. The results obtained suggest that RWAs should be designed considering the specific geographic and infrastructural conditions of their jurisdictional areas and that priorities should be selected in their institutional capacity building strategies that match local realities. Furthermore, the results also indicate that RWAs have enjoyed limited support from basin stakeholders, mainly in basins with less hydraulic infrastructure, in securing water availability for their users and minimizing the effect of climate variability.

  5. Application of analytical redundancy management to Shuttle crafts. [computerized simulation of microelectronic implementation

    NASA Technical Reports Server (NTRS)

    Montgomery, R. C.; Tabak, D.

    1979-01-01

    The study involves the bank of filters approach to analytical redundancy management since this is amenable to microelectronic implementation. Attention is given to a study of the UD factorized filter to determine if it gives more accurate estimates than the standard Kalman filter when data processing word size is reduced. It is reported that, as the word size is reduced, the effect of modeling error dominates the filter performance of the two filters. However, the UD filter is shown to maintain a slight advantage in tracking performance. It is concluded that because of the UD filter's stability in the serial processing mode, it remains the leading candidate for microelectronic implementation.

  6. Assessing the impact of continuous quality improvement/total quality management: concept versus implementation.

    PubMed Central

    Shortell, S M; O'Brien, J L; Carman, J M; Foster, R W; Hughes, E F; Boerstler, H; O'Connor, E J

    1995-01-01

    OBJECTIVE: This study examines the relationships among organizational culture, quality improvement processes and selected outcomes for a sample of up to 61 U. S. hospitals. DATA SOURCES AND STUDY SETTING: Primary data were collected from 61 U. S. hospitals (located primarily in the midwest and the west) on measures related to continuous quality improvement/total quality management (CQI/TQM), organizational culture, implementation approaches, and degree of quality improvement implementation based on the Baldrige Award criteria. These data were combined with independently collected data on perceived impact and objective measures of clinical efficiency (i.e., charges and length of stay) for six clinical conditions. STUDY DESIGN: The study involved cross-sectional examination of the named relationships. DATA COLLECTION/EXTRACTION METHODS: Reliable and valid scales for the organizational culture and quality improvement implementation measures were developed based on responses from over 7,000 individuals across the 61 hospitals with an overall completion rate of 72 percent. Independent data on perceived impact were collected from a national survey and independent data on clinical efficiency from a companion study of managed care. PRINCIPAL FINDINGS: A participative, flexible, risk-taking organizational culture was significantly related to quality improvement implementation. Quality improvement implementation, in turn, was positively associated with greater perceived patient outcomes and human resource development. Larger-size hospitals experienced lower clinical efficiency with regard to higher charges and higher length of stay, due in part to having more bureaucratic and hierarchical cultures that serve as a barrier to quality improvement implementation. CONCLUSIONS: What really matters is whether or not a hospital has a culture that supports quality improvement work and an approach that encourages flexible implementation. Larger-size hospitals face more difficult

  7. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  8. Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  9. [Management of quality in an Intensive Care Unit: implementation of ISO 9001:2008 international standard].

    PubMed

    Lorenzo Torrent, R; Sánchez Palacios, M; Santana Cabrera, L; Cobian Martinez, J L; García del Rosario, C

    2010-10-01

    The Quality Management Systems make it possible to prioritize actions to maintain the safety and efficacy of health technologies. The Intensive Care Unit of our hospital has implemented a quality management plan, which has obtained accreditation as "Service Certificate that manages its activities according to UNE-EN ISO 9001:2008" standard. With the application of quality management system, it has been possible to detect the needs that the Service can cover in order to obtain the satisfaction of the patient, relative or health personnel of the other services of the hospital, to improve communications inside and outside of service, to secure greater understanding of the processes of the organization and control of risk, to delimit responsibilities clearly to all the personnel, to make better use of the time and resources and, finally, to improve the motivation of the personnel.

  10. Optimal environmental management strategy and implementation for groundwater contamination prevention and restoration.

    PubMed

    Wang, Mingyu

    2006-04-01

    An innovative management strategy is proposed for optimized and integrated environmental management for regional or national groundwater contamination prevention and restoration allied with consideration of sustainable development. This management strategy accounts for availability of limited resources, human health and ecological risks from groundwater contamination, costs for groundwater protection measures, beneficial uses and values from groundwater protection, and sustainable development. Six different categories of costs are identified with regard to groundwater prevention and restoration. In addition, different environmental impacts from groundwater contamination including human health and ecological risks are individually taken into account. System optimization principles are implemented to accomplish decision-makings on the optimal resources allocations of the available resources or budgets to different existing contaminated sites and projected contamination sites for a maximal risk reduction. Established management constraints such as budget limitations under different categories of costs are satisfied at the optimal solution. A stepwise optimization process is proposed in which the first step is to select optimally a limited number of sites where remediation or prevention measures will be taken, from all the existing contaminated and projected contamination sites, based on a total regionally or nationally available budget in a certain time frame such as 10 years. Then, several optimization steps determined year-by-year optimal distributions of the available yearly budgets for those selected sites. A hypothetical case study is presented to demonstrate a practical implementation of the management strategy. Several issues pertaining to groundwater contamination exposure and risk assessments and remediation cost evaluations are briefly discussed for adequately understanding implementations of the management strategy.

  11. Implementation of the Performance Management System (PMS) in Senior Secondary Schools in Botswana: An Investigation of Senior Management Team's Expected Benefits of the PMS

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2012-01-01

    Different forms of the performance management system have been implemented in many countries for some years. As in other countries, in 1999 the government of Botswana took a decision to implement a performance management system (PMS) across the entire public service including schools. The government explained the purpose for which this reform was…

  12. Dynamic Airspace Configuration

    NASA Technical Reports Server (NTRS)

    Bloem, Michael J.

    2014-01-01

    In air traffic management systems, airspace is partitioned into regions in part to distribute the tasks associated with managing air traffic among different systems and people. These regions, as well as the systems and people allocated to each, are changed dynamically so that air traffic can be safely and efficiently managed. It is expected that new air traffic control systems will enable greater flexibility in how airspace is partitioned and how resources are allocated to airspace regions. In this talk, I will begin by providing an overview of some previous work and open questions in Dynamic Airspace Configuration research, which is concerned with how to partition airspace and assign resources to regions of airspace. For example, I will introduce airspace partitioning algorithms based on clustering, integer programming optimization, and computational geometry. I will conclude by discussing the development of a tablet-based tool that is intended to help air traffic controller supervisors configure airspace and controllers in current operations.

  13. Implementing chronic disease management in the public healthcare sector in Singapore: the role of hospitals.

    PubMed

    Cheah, J; Heng, B H

    2001-01-01

    The public health care delivery system in Singapore faces the challenges of a rapidly ageing population, an increasing chronic disease burden, increasing healthcare cost, rising expectations and demand for better health services, and shortage of resources. It is also fragmented, resulting in duplication and lack of coordination between institutions. A disease management approach has been adopted by the National Healthcare Group (NHG) as a critical strategy to provide holistic, cost-effective, seamless and well-coordinated care across the continuum. The framework in the development of the disease management plan included identifying the diseases and defining the target population, organizing a multi-disciplinary team lead by a clinician champion, defining the core components, treatment protocols and evaluation methods, defining the goals, and measuring and managing the outcomes. As disease management and case management for chronic diseases are new approaches adopted in the healthcare delivery system, there is a lack of understanding by healthcare professionals. The leadership and participation of hospital physicians was sought in the planning, design and outcomes monitoring to ensure their 'buy-in' and the successful implementation and effectiveness of the program. The episodic diagnosis related group (DRG)-based framework of funding and subvention for healthcare, and the shortage of step-care care facilities, have been recognized by the Ministry of Health as an impediments to the implementation, and these are currently being addressed.

  14. Implementation of Sustainable Soil Management Practices to Improve Crop Production in the Different Ethiopian Agro Systems

    NASA Astrophysics Data System (ADS)

    García Moreno, R.; Gameda, S.; Diaz Alvarez, M. C.; Selasie, Y. G.

    2012-04-01

    Agriculture in Ethiopia is one of first priority since close to 10 In this context, the Ethiopian crop production faces to the following soil management challenges: lack of updated soil data, macro and micro nutrient depletion, acidity, salinity and soil surface erosion and crusting. One of the biggest issues is the loss of arable land, above 137 T/yr, reaching during some particularly dried periods until 300 T/yr. In this context, the authors constituted a working group of experts from Spanish and Ethiopian universities, local producers and international and governmental organisms to analyse the problems related to the different agro ecological zones found in Ethiopia and the management practices of different local producers. The study produced the trends to implement in the different areas to improve soil management practices in order to contribute to increase the crop production mainly to achieve food security problems. The analyse produced different working fields for the next years for addressing soil degradation, improving land resources management practices, increasing agricultural productivity, updating the available soil data, developing an international program of education, transferring of knowledge from similar study cases and implementing economical tools to help producers to assure income after severe edapho-climatic events. The practical work and the projects developed for the next period is addressed to smallholder farms belonging to the different 34 agro ecological zones identified in Ethiopia, each of them with very specific environmental, cultural and soil management practices.

  15. Tying it all together: The Integrated Academic Information Management System being implemented at Maryland.

    PubMed

    Ball, M J; Douglas, J V

    1988-01-01

    With the National Library of Medicine serving as the catalyst, the University of Maryland at Baltimore, Campus for the Professions, entered into a major initiative to integrate information management systems in support of the campus missions of education, research, and clinical care. Strategic planning initiated the integration process and continues in an iterative mode. In support of integration, changes were made in the campus organizational structure and in its technological infrastructure. Implementation involves transforming the Information Resources Management Division into an information utility on a phased and incremental basis. Collaboration with the Health Sciences Library is key to this transformation, as are numerous outreach activities. PMID:3288352

  16. IEA Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Meier, Alan; Runci, Paul J.

    2008-08-05

    This guide presents insights and guidance from DOE’s gathered through longstanding and extensive participation in IEA implementing agreements (IAs) and annexes. Even though DOE has been a key participant in international research activities through the IEA since the 1970s, the experience, knowledge, and institutional memory associated with these activities can be lost or forgotten easily as key DOE managers retire or leave the department. The guide seeks to assemble in a single reference some of the learning that has occurred through participation in IEA IAs as a guide for BTP managers currently responsible for IAs and for those who might consider entering into new IEA activities in the future.

  17. Tying it all together: The Integrated Academic Information Management System being implemented at Maryland.

    PubMed

    Ball, M J; Douglas, J V

    1988-01-01

    With the National Library of Medicine serving as the catalyst, the University of Maryland at Baltimore, Campus for the Professions, entered into a major initiative to integrate information management systems in support of the campus missions of education, research, and clinical care. Strategic planning initiated the integration process and continues in an iterative mode. In support of integration, changes were made in the campus organizational structure and in its technological infrastructure. Implementation involves transforming the Information Resources Management Division into an information utility on a phased and incremental basis. Collaboration with the Health Sciences Library is key to this transformation, as are numerous outreach activities.

  18. Implement a site management strategy to save money and achieve timely closure

    SciTech Connect

    Buratovich-Collins, J.

    1996-12-31

    Federal regulatory standards for remediation of contaminated groundwater have been technically impossible to meet within reasonable time frames and budgets. A site management strategy (SMS) defending alternate cleanup levels (ACLs) or technical impracticability (TI) waivers and characterizing risk, managing site data, and implementing a practical site remediation approach can be very effective in saving time and money at contaminated sites. The engineering and scientific communities have been looking for practical solutions to groundwater cleanup at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. Records of Decisions (RODs) and Corrective Measures Implementation Plans have historically specified cleanup standards for contaminated groundwater that are technically impossible to meet within reasonable time frames (such as drinking water standards). Restoration of drinking water standards was the cleanup goal for groundwater in 270 of approximately 300 Superfund RODs issued between 1987 and 1991. These statistics notwithstanding, very few sites contaminated with organic chemicals have been remediated to numerical groundwater standards.

  19. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    PubMed

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  20. National Aeronautics and Space Administration Marshall Space Flight Center Space Transportation Directorate Risk Management Implementation Program

    NASA Technical Reports Server (NTRS)

    Duarte, Luis Alberto; Kross, Denny (Technical Monitor)

    2001-01-01

    The US civil aerospace program has been a great contributor to the creation and implementation of techniques and methods to identify, analyze, and confront risk. NASA has accomplished mission success in many instances, but also has had many failures. Anomalies have kept the Agency from achieving success on other occasions, as well. While NASA has mastered ways to prevent risks, and to quickly and effectively react and recover from anomalies or failures, it was not until few years ago that a comprehensive Risk Management process started being implemented in some of its programs and projects. A Continuous Risk Management (CRM) cycle process was developed and has been promoted and used successfully in programs and projects across the Agency.

  1. Implementation of Management Strategies for Diabetes and Hypertension: from Local to Global Health in Cardiovascular Diseases

    PubMed Central

    Bloomfield, Gerald S.; Wang, Tracy Y.; Boulware, L. Ebony; Califf, Robert M.; Hernandez, Adrian F.; Velazquez, Eric J.; Peterson, Eric D.; Li, Jennifer S.

    2016-01-01

    Diabetes and hypertension are chronic conditions that are growing in prevalence as major causal factors for cardiovascular disease. The need for chronic illness surveillance, population risk management, and successful treatment interventions are critical to reduce the burden of future cardiovascular disease. In order to address these problems, it will require population risk stratification, task sharing and shifting, and community- as well as network -based care. Information technology tools also provide new opportunities for identifying those at risk and for implementing comprehensive approaches to achieving the goal of improved health locally, regionally, nationally and globally. This article discusses ongoing efforts at one university health center in the implementation of management strategies for diabetes and hypertension at the local, regional, national, and global levels. PMID:25754564

  2. A model of evaluation planning, implementation and management: Toward a ?culture of information? within organizations

    NASA Astrophysics Data System (ADS)

    Bhola, H. S.

    1992-03-01

    The argument underlying the ongoing "paradigm shift" from logical positivism to constructionism is briefly laid out. A model of evaluation planning, implementation and management (called the P-I-M Model, for short) is then presented that assumes a complementarity between the two paradigms. The model further implies that for effective decision-making within human organizations, both "evaluative data" and "descriptive data" are needed. "Evaluative data" generated by evaluation studies must, therefore, be undergirded by an appropriate management information system (MIS) that can generate "descriptive data", concurrently with the process of program implementation. The P-I-M Model, if fully actualized, will enable human organizations to become vibrant "cultures of information" where "informed" decision-making becomes a shared norm among all stakeholders.

  3. International Energy Agency Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Runci, Paul; Meier, Alan

    2008-08-01

    This report presents results from a program evaluation of the U.S. Department of Energy?s Buildings Technologies Program (BTP) participation in collaborative international technology implementing agreements. The evaluation was conducted by researchers from the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory in the fall of 2007 and winter 2008 and was carried out via interviews with stakeholders in four implementing agreements in which BTP participates, reviews of relevant program reports, websites and other published materials. In addition to these findings, the report includes a variety of supporting materials such that aim to assist BTP managers who currently participate in IEA implementing agreements or who may be considering participation.

  4. A Knowledge Management Approach to Support Software Process Improvement Implementation Initiatives

    NASA Astrophysics Data System (ADS)

    Montoni, Mariano Angel; Cerdeiral, Cristina; Zanetti, David; Cavalcanti da Rocha, Ana Regina

    The success of software process improvement (SPI) implementation initiatives depends fundamentally of the strategies adopted to support the execution of such initiatives. Therefore, it is essential to define adequate SPI implementation strategies aiming to facilitate the achievement of organizational business goals and to increase the benefits of process improvements. The objective of this work is to present an approach to support the execution of SPI implementation initiatives. We also describe a methodology applied to capture knowledge related to critical success factors that influence SPI initiatives. This knowledge was used to define effective SPI strategies aiming to increase the success of SPI initiatives coordinated by a specific SPI consultancy organization. This work also presents the functionalities of a set of tools integrated in a process-centered knowledge management environment, named CORE-KM, customized to support the presented approach.

  5. Governing the implementation of Emergency Obstetric Care: experiences of Rural District Health Managers, Tanzania

    PubMed Central

    2014-01-01

    Background Many health policies developed internationally often become adopted at the national level and are implemented locally at the district level. A decentralized district health system led by a district health management team becomes responsible for implementing such policies. This study aimed at exploring the experiences of a district health management team in implementing Emergency Obstetric Care (EmOC) related policies and identifying emerging governance aspects. Methods The study used a qualitative approach in which data was obtained from thirteen individual interviews and one focus group discussion (FGD). Interviews were conducted with members of the district health management team, district health service boards and NGO representatives. The FGD included key informants who were directly involved in the work of implementing EmOC services in the district. Documentary reviews and observation were done to supplement the data. All the materials were analysed using a qualitative content analysis approach. Results Implementation of EmOC was considered to be a process accompanied by achievements and challenges. Achievements included increased institutional delivery, increased number of ambulances, training service providers in emergency obstetric care and building a new rural health centre that provides comprehensive emergency obstetric care. These achievements were associated with good leadership skills of the team together with partnerships that existed between different actors such as the Non-Governmental Organization (NGO), development partners, local politicians and Traditional Birth Attendants (TBAs). Most challenges faced during the implementation of EmOC were related to governance issues at different levels and included delays in disbursement of funds from the central government, shortages of health workers, unclear mechanisms for accountability, lack of incentives to motivate overburdened staffs and lack of guidelines for partnership development

  6. Performance evaluation of River Basin Organizations to implement integrated water resources management using composite indexes

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    In the Southern African Development Community region, Integrated Water Resources Management (IWRM) principles and tools are being implemented through the existing regional framework for water resources development and management. The IWRM approach is applied at river basin level seeking a balance between the economic efficiency, social equity and environmental sustainability in water resources management and development. This paper uses composite indexes to analyze the performance of River Basin Organizations (RBOs) as key implementing agents of the IWRM framework. The assessment focuses on three RBOs that fall under the Regional Water Administration for Southern Mozambique (ARA-Sul) jurisdiction, namely: Umbeluzi, Incomati and Limpopo River Basin Management Units. The analysis focus on the computation of a set of multidimensional key performance indicators developed by Hooper (2010) but adapted to the Mozambican context. This research used 24 out of 115 proposed universal key performance indicators. The indicators for this case study were selected based on their suitability to evaluate performance in line with the legal and institutional framework context that guides the operations of RBOs in Mozambique. Finally these indicators were integrated in a composite index, using an additive and multiplicative aggregation method coupled with the Analytic Hierarchy Process technique employed to differentiate the relative importance of the various indicators considered. The results demonstrate the potential usefulness of the methodology developed to analyze the RBOs performance and proved useful in identifying the main performance areas in need of improvement for better implementation of IWRM at river basin level in Mozambique. This information should support both the IWRM framework adaptation to local context and the implementation at river basin level in order to improve water governance.

  7. Design and Implementation of 3D Model Data Management System Based on SQL

    NASA Astrophysics Data System (ADS)

    Li, Shitao; Zhang, Shixin; Zhang, Zhanling; Li, Shiming; Jia, Kun; Hu, Zhongxu; Ping, Liang; Hu, Youming; Li, Yanlei

    CAD/CAM technology plays an increasingly important role in the machinery manufacturing industry. As an important means of production, the accumulated three-dimensional models in many years of design work are valuable. Thus the management of these three-dimensional models is of great significance. This paper gives detailed explanation for a method to design three-dimensional model databases based on SQL and to implement the functions such as insertion, modification, inquiry, preview and so on.

  8. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  9. Advanced consequence management program: challenges and recent real-world implementations

    NASA Astrophysics Data System (ADS)

    Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.

    2002-08-01

    The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.

  10. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects. PMID:24523303

  11. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  12. Implementing chronic disease self-management in community settings: lessons from Australian demonstration projects.

    PubMed

    Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J

    2007-11-01

    The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits. PMID:17973606

  13. Implementing practice management strategies to improve patient care: the EPIC project.

    PubMed

    Attwell, David; Rogers-Warnock, Leslie; Nemis-White, Joanna

    2012-01-01

    Healthcare gaps, the difference between usual care and best care, are evident in Canada, particularly with respect to our aging, ailing population. Primary care practitioners are challenged to identify, prevent and close care gaps in their practice environment given the competing demands of informed, litigious patients with complex medical needs, ever-evolving scientific evidence with new treatment recommendations across many disciplines and an enhanced emphasis on quality and accountability in healthcare. Patient-centred health and disease management partnerships using measurement, feedback and communication of practice patterns and outcomes have been shown to narrow care gaps. Practice management strategies such as the use of patient registries and recall systems have also been used to help practitioners better understand, follow and proactively manage populations of patients in their practice. The Enhancing Practice to Improve Care project was initiated to determine the impact of a patient-centred health and disease management partnership using practice management strategies to improve patient care and outcomes for patients with chronic kidney disease (CKD). Forty-four general practices from four regions of British Columbia participated and, indeed, demonstrated that care and outcomes for patients with CKD could be improved via the implementation of practice management strategies in a patient-centred partnership measurement model of health and disease management.

  14. Implementing chronic disease self-management in community settings: lessons from Australian demonstration projects.

    PubMed

    Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J

    2007-11-01

    The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits.

  15. The case and opportunity for public-supported financial incentives to implement integrated pest management.

    PubMed

    Brewer, Michael J; Hoard, Robert J; Landis, Joy N; Elworth, Lawrence E

    2004-12-01

    Food, water, and worker protection regulations have driven availability, and loss, of pesticides for use in pest management programs. In response, public-supported research and extension projects have targeted investigation and demonstration of reduced-risk integrated pest management (IPM) techniques. But these new techniques often result in higher financial burden to the grower, which is counter to the IPM principle that economic competitiveness is critical to have IPM adopted. As authorized by the 2002 Farm Bill and administered by the U.S. Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS), conservation programs exist for delivering public-supported financial incentives to growers to increase environmental stewardship on lands in production. NRCS conservation programs are described, and the case for providing financial incentives to growers for implementing IPM is presented. We also explored the opportunity and challenge to use one key program, the Environmental Quality Incentives Program (EQIP), to aid grower adoption of IPM. The EQIP fund distribution to growers from 1997 to 2002 during the last Farm Bill cycle totaled approximately 1.05 billion dollars with a portion of funds supporting an NRCS-designed pest management practice. The average percentage of allocation of EQIP funds to this pest management practice among states was 0.77 +/- 0.009% (mean +/- SD). Using Michigan as an example, vegetable and fruit grower recognition of the program's use to implement IPM was modest (25% of growers surveyed), and their recognition of its use in aiding implementation of IPM was improved after educational efforts (74%). Proposals designed to enhance program usefulness in implementing IPM were delivered through the NRCS advisory process in Michigan. Modifications for using the NRCS pest management practice to address resource concerns were adopted, incentive rates for pest management were adjusted, and an expanded incentive structure for IPM

  16. Multidisciplinary teams of case managers in the implementation of an innovative integrated services delivery for the elderly in France

    PubMed Central

    2014-01-01

    Background The case management process is now well defined, and teams of case managers have been implemented in integrated services delivery. However, little is known about the role played by the team of case managers and the value in having multidisciplinary case management teams. The objectives were to develop a fuller understanding of the role played by the case manager team and identify the value of inter-professional collaboration in multidisciplinary teams during the implementation of an innovative integrated service in France. Methods We conducted a qualitative study with focus groups comprising 14 multidisciplinary teams for a total of 59 case managers, six months after their recruitment to the MAIA program (Maison Autonomie Integration Alzheimer). Results Most of the case managers saw themselves as being part of a team of case managers (91.5%). Case management teams help case managers develop a comprehensive understanding of the integration concept, meet the complex needs of elderly people and change their professional practices. Multidisciplinary case management teams add value by helping case managers move from theory to practice, by encouraging them develop a comprehensive clinical vision, and by initiating the interdisciplinary approach. Conclusions The multidisciplinary team of case managers is central to the implementation of case management and helps case managers develop their new role and a core inter-professional competency. PMID:24708721

  17. Management experiences and trends for water reuse implementation in Northern California.

    PubMed

    Bischel, Heather N; Simon, Gregory L; Frisby, Tammy M; Luthy, Richard G

    2012-01-01

    In 2010, California fell nearly 300,000 acre-ft per year (AFY) short of its goal to recycle 1,000,000 AFY of municipal wastewater. Growth of recycled water in the 48 Northern California counties represented only 20% of the statewide increase in reuse between 2001 and 2009. To evaluate these trends and experiences, major drivers and challenges that influenced the implementation of recycled water programs in Northern California are presented based on a survey of 71 program managers conducted in 2010. Regulatory requirements limiting discharge, cited by 65% of respondents as a driver for program implementation, historically played an important role in motivating many water reuse programs in the region. More recently, pressures from limited water supplies and needs for system reliability are prevalent drivers. Almost half of respondents (49%) cited ecological protection or enhancement goals as drivers for implementation. However, water reuse for direct benefit of natural systems and wildlife habitat represents just 6-7% of total recycling in Northern California and few financial incentives exist for such projects. Economic challenges are the greatest barrier to successful project implementation. In particular, high costs of distribution systems (pipelines) are especially challenging, with $1 to 3 million/mile costs experienced. Negative perceptions of water reuse were cited by only 26% of respondents as major hindrances to implementation of surveyed programs.

  18. Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans

    NASA Astrophysics Data System (ADS)

    Neuhold, Clemens

    2013-04-01

    he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time

  19. Improving Knowledge Management in the Health Service: Re-Engineering Approach Towards Successful Implementation

    NASA Astrophysics Data System (ADS)

    Gyampoh-Vidogah, Regina; Moreton, Robert

    Changes to business practices involve risks. There has always been an attempt to develop various concepts for successful restructuring of business processes to enable technology adoption. This is due to the fact that the success of any business depends as much on how it is structured, as well as its ability to adopt new technology. As a consequence, the great success stories of the global economy emanate from those organisations most capable of adopting new technology, which invariably includes information technology (IT). This chapter examines how business process re-engineering (BPR) can be used to improve knowledge management (KM) in health services by (i) assessing the effectiveness and usefulness of BPR; (ii) present a critical review of approaches to BPR; and (iii) describe a framework for using BPR for KM based on empirical research. The aim is to provide a sound strategic and tactical management approach for successful implementation of knowledge management systems (KMS) to improve health-care service project administration.

  20. [Implementation of a quality management system for research and teaching in a university department of epidemiology].

    PubMed

    Berghöfer, Anne; de Bucourt, Maximilian; Willich, Stefan N

    2007-01-01

    The present article analyses the development and implementation of quality management systems at institutes for clinical and theoretical research as exemplified by the Charité University Medical Centre's Institute for Social Medicine, Epidemiology, and Health Economics in Berlin. The Institute established its quality management system independently (i.e. without external consultants) and was able to fulfil the standard requirements within one year. The quality management system was successfully certified under European Standard DIN EN ISO 9001:2000 by an authorized external DIN-accredited inspection authority in October 2005 and recertified one year later. The certification covered the areas of research, teaching, and supporting administration. Our description of the individual steps involved and the corresponding timeline may be useful to organizations of a similar type and size seeking professional external certification.

  1. IS0 9000 Implementation and Assessment: A Guide to Developing and Evaluating Quality Management Systems

    NASA Technical Reports Server (NTRS)

    Navarro, Robert J.; Grimm, Barry

    1996-01-01

    The agency has developed this reference publication to aid NASA organizations and their suppliers in the transition to IS0 9000. This guide focuses on the standard s intent, clarifies its requirements, offers implementation examples and highlights interrelated areas. It can assist anyone developing or evaluating NASA or supplier quality management systems. The IS0 9000 standards contain the basic elements for managing those processes that affect an organization's ability to consistently meet customer requirements. IS0 9000 was developed through the International Organization for Standardization and has been adopted as the US. national standard. These standards define a flexible foundation for customer focused process measurement, management and improvement that is the hallmark of world class enterprises.

  2. IMPLEmenting a clinical practice guideline for acute low back pain evidence-based manageMENT in general practice (IMPLEMENT): Cluster randomised controlled trial study protocol

    PubMed Central

    McKenzie, Joanne E; French, Simon D; O'Connor, Denise A; Grimshaw, Jeremy M; Mortimer, Duncan; Michie, Susan; Francis, Jill; Spike, Neil; Schattner, Peter; Kent, Peter M; Buchbinder, Rachelle; Green, Sally E

    2008-01-01

    Background Evidence generated from reliable research is not frequently implemented into clinical practice. Evidence-based clinical practice guidelines are a potential vehicle to achieve this. A recent systematic review of implementation strategies of guideline dissemination concluded that there was a lack of evidence regarding effective strategies to promote the uptake of guidelines. Recommendations from this review, and other studies, have suggested the use of interventions that are theoretically based because these may be more effective than those that are not. An evidence-based clinical practice guideline for the management of acute low back pain was recently developed in Australia. This provides an opportunity to develop and test a theory-based implementation intervention for a condition which is common, has a high burden, and for which there is an evidence-practice gap in the primary care setting. Aim This study aims to test the effectiveness of a theory-based intervention for implementing a clinical practice guideline for acute low back pain in general practice in Victoria, Australia. Specifically, our primary objectives are to establish if the intervention is effective in reducing the percentage of patients who are referred for a plain x-ray, and improving mean level of disability for patients three months post-consultation. Methods/Design This study protocol describes the details of a cluster randomised controlled trial. Ninety-two general practices (clusters), which include at least one consenting general practitioner, will be randomised to an intervention or control arm using restricted randomisation. Patients aged 18 years or older who visit a participating practitioner for acute non-specific low back pain of less than three months duration will be eligible for inclusion. An average of twenty-five patients per general practice will be recruited, providing a total of 2,300 patient participants. General practitioners in the control arm will receive access

  3. [Design, implementation and evaluation of a management model of patient safety in hospitals in Catalonia, Spain].

    PubMed

    Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim

    2014-07-01

    Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues.

  4. Hybrid Electric Vehicle Power Management Solutions Based on Isolated and Non-Isolated Configurations of MMCCC Converter

    SciTech Connect

    Khan, Faisal H; Tolbert, Leon M; Webb, William E

    2009-01-01

    This paper presents the various configurations of a multilevel modular capacitor-clamped converter (MMCCC), and it reveals many useful and new formations of the original MMCCC for transferring power in either an isolated or nonisolated manner. The various features of the original MMCCC circuit are best suited for a multibus system in future plug-in hybrid or fuel-cell-powered vehicles' drive train. The original MMCCC is capable of bidirectional power transfer using multilevel modular structure with capacitor-clamped topology. It has a nonisolated structure, and it offers very high efficiency even at partial loads. This circuit was modified to integrate single or multiple high-frequency transformers by using the intermediate voltage nodes of the converter. On the other hand, a special formation of the MMCCC can exhibit dc outputs offering limited isolation without using any isolation transformer. This modified version can produce a high conversion ratio from a limited number of components and has several useful applications in providing power to multiple low-voltage loads in a hybrid or electric automobile. This paper will investigate the origin of generating ac outputs from the MMCCC and shows how the transformer-free version can be modified to create limited isolation from the circuit. In addition, this paper will compare various modified forms of the MMCCC topology with existing dc-dc converter circuits from compactness and component utilization perspectives.

  5. Rheumatology clinicians’ experiences of brief training and implementation of skills to support patient self-management

    PubMed Central

    2014-01-01

    Background Self-management of arthritis requires informed, activated patients to manage its physical and psychosocial consequences. Patient activation and self-management can be enhanced through the use of cognitive-behavioural approaches, which have a strong evidence base and provide insight into the variation in outcome of patients with ostensibly the same degree of disease activity. However, training for rheumatology health professionals in theory and skills underpinning the facilitation of self-management is not widely available. To develop such training, this study explored rheumatology clinicians’ experiences of a variety of brief skills training courses to understand which aspects were helpful or unhelpful, and to identify the barriers and facilitators of applying the skills in clinical practice. Methods 16 clinicians who had previously attended communication and self-management skills training participated in semi-structured interviews: 3 physicians, 3 physiotherapists, 4 nurses, 6 occupational therapists. Transcripts were analysed (ED) using a hybrid inductive and deductive thematic approach, with a subset independently analysed (SH, RG-H, RJ). Results 3 overarching themes captured views about training undertaken and subsequent use of approaches to facilitate self-management. In ‘putting theory into practice’, clinicians felt that generic training was not as relevant as rheumatology-specific training. They wanted a balance between theory and skills practice, and identified the importance of access to ongoing support. In ‘challenging professional identity’, models of care and working cultures influenced learning and implementation. Training often challenged a tendency to problem-solve on behalf of patients and broadened clinicians’ remit from a primary focus on physical symptoms to the mind and body interaction. In ‘enhanced practice’, clinicians viewed consultations as enhanced after training. Focus had shifted from clinicians’ agendas to

  6. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  7. Improving the management of sepsis in a district general hospital by implementing the 'Sepsis Six' recommendations.

    PubMed

    Kumar, Prashant; Jordan, Mark; Caesar, Jenny; Miller, Sarah

    2015-01-01

    Sepsis is a common condition with a major global impact on healthcare resources and expenditure. The Surviving Sepsis Campaign has been vigorous in promoting internationally recognised pathways to improve the management of septic patients and decrease mortality. However, translating recommendations into practice is a challenging and complex task that requires a multi-faceted approach with sustained engagement from local stakeholders. Whilst working at a district general hospital in New Zealand, we were concerned by the seemingly inconsistent management of septic patients, often leading to long delays in the initiation of life-saving measures such as antibiotic, fluid, and oxygen administration. In our hospital there were no clear systems, protocols or guidelines in place for identifying and managing septic patients. We therefore launched the Sepsis Six resuscitation bundle of care in our hospital in an attempt to raise awareness amongst staff and improve the management of septic patients. We introduced a number of simple low-cost interventions that included educational sessions for junior doctors and nursing staff, as well as posters and modifications to phlebotomy trolleys that acted as visual reminders to implement the Sepsis Six bundle. Overall, we found there to a be a steady improvement in the delivery of the Sepsis Six bundle in septic patients with 63% of patients receiving appropriate care within one hour, compared to 29% prior to our interventions. However this did not translate to an improvement in patient mortality. This project forms part of an on going process to instigate a fundamental culture change among local healthcare professionals regarding the management of sepsis. Whilst we have demonstrated improved implementation of the Sepsis Six bundle, the key challenge remains to ensure that momentum of this project continues and forms a platform for sustainable clinical improvement in the long term. PMID:26734403

  8. Food safety of allergic patients in hospitals: implementation of a quality strategy to ensure correct management.

    PubMed

    Sergeant, P; Kanny, G; Morisset, M; Waguet, J C; Bastien, C; Moneret-Vautrin, D A

    2003-04-01

    Food allergy could affect up to 8% of children. Four cases of food anaphylaxis in hospitalized children are reported, pointing to the need of food allergenic safety procedures in hospital settings. The implementation of the operating procedure in hospital food production units (HFPU) of Nancy University Hospital is described. The dietetics Department developed on hypoallergenic diet and specific avoidance diets. Dieticians within HFPU managed the choice of starting materials, the circuit organization in order to avoid any risk of contamination during preparation and cooking of food, product traceability, and trained the staff of HFPU. Within the care units physicians, dieticians, nurses, hospital workers are involved in meal management. A diet monitoring sheet is integrated into the patient's nursing file and enables the dietician to validate the diet in the computer, the nurses to display the patient's diet on the schedule on the wall in their office. The hospital workers finally use a tray form indicating the patient's identity, his/her diet and the menu of the day. Such a procedure absolutely secures the whole circuit and specifies the responsibilities of each person, whilst ensuring effective cooperation between all partners. Since 1999, the implementation of this multi-step strategy has prevented from any further reaction in a department specialized for food allergies in children and in adults. As setting up food allergenic safety in hospitals in not addressed adequately in the European directives, it's judicious to draw attention of hospital catering managers and hospital canteen staff to this necessity.

  9. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  10. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  11. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran

    PubMed Central

    2014-01-01

    Background The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Results Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Conclusion Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems. PMID:24423020

  12. Implementing a patient blood management program in Norway: Where to start?

    PubMed

    Espinosa, A; Arsenovic, M; Hervig, T; Sundic, T; Aandahl, A; Kronborg, J; Seghatchian, J

    2016-06-01

    Norway has recently established a working group to implement a national patient blood management (PBM) program. Although benchmarking regarding blood usage is challenging in Norway due to legal barriers, a survey was sent to different hospitals to identify possible areas to be prioritized in the first phase of the PBM program. Among them, optimizing the patient's hemoglobin level before elective surgery and implementing electronic check-lists for the indication of transfusion when ordering blood products are two measures that may have a considerable impact on blood usage. The results of the survey also showed that patients may receive a red blood cell transfusion at hemoglobin levels that are higher than those internationally recommended. Since there are no national guidelines for the use of blood products, agreement regarding hemoglobin thresholds is essential to reduce variation in transfusion practice. To achieve these goals, the transfusion specialist plays a key role in promoting the principles behind the PBM concept at the local hospital. PMID:27216542

  13. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    SciTech Connect

    Streit, R.D.; Couture, S.A.

    1995-03-01

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ``demonstration technologies.`` Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria.

  14. Implementing business continuity management systems and sharing best practices at a European bank.

    PubMed

    Aronis, Stelios; Stratopoulos, Georgios

    2016-01-01

    This paper provides an overview of the methodology applied by the Alpha Bank Group in order to implement a business continuity management (BCM) programme to its parent company (Alpha Bank SA), as well as to its subsidiaries in Albania, Bulgaria, Cyprus, Former Yugoslav Republic of Macedonia, Greece, Romania, Serbia, UK and Ukraine. It also reviews the problems faced, how they were overcome and the lessons learned. When implementing a BCM programme in a large organisation, it is very important to follow the methodology described by BCM standard ISO 22301, otherwise the business continuity plan is unlikely to work efficiently or comply with the business recovery requirements, as well as with the requirements of other interested parties, such as customers, regulatory authorities, vendors, service providers, critical associates, etc. PMID:26897617

  15. Implementing business continuity management systems and sharing best practices at a European bank.

    PubMed

    Aronis, Stelios; Stratopoulos, Georgios

    2016-01-01

    This paper provides an overview of the methodology applied by the Alpha Bank Group in order to implement a business continuity management (BCM) programme to its parent company (Alpha Bank SA), as well as to its subsidiaries in Albania, Bulgaria, Cyprus, Former Yugoslav Republic of Macedonia, Greece, Romania, Serbia, UK and Ukraine. It also reviews the problems faced, how they were overcome and the lessons learned. When implementing a BCM programme in a large organisation, it is very important to follow the methodology described by BCM standard ISO 22301, otherwise the business continuity plan is unlikely to work efficiently or comply with the business recovery requirements, as well as with the requirements of other interested parties, such as customers, regulatory authorities, vendors, service providers, critical associates, etc.

  16. Capacity building in rural Guatemala by implementing a solid waste management program

    SciTech Connect

    Zarate, M.A. Slotnick, J.; Ramos, M.

    2008-12-15

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatan between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper.

  17. Mining the Management Literature for Insights into Implementing Evidence-Based Change in Healthcare

    PubMed Central

    Harlos, Karen; Tetroe, Jacqueline; Graham, Ian D.; Bird, Madeleine; Robinson, Nicole

    2012-01-01

    Objective: We synthesized the management and health literatures for insights into implementing evidence-based change in healthcare drawn from industry-specific data. Because change principles based on evidence often fail to be translated into organizational practice or policy, we sought studies at the nexus of organizational change and knowledge translation. Methods: We reviewed five top management journals to identify an initial pool of 3,091 studies, which yielded a final sample of 100 studies. Data were abstracted, verified by the original authors and revised before entry into a database. We employed a systematic narrative synthesis approach using words and text to distill data and explain relationships. We categorized studies by varying levels of relevance for knowledge translation as (1) primary, direct; (2) intermediate; and (3) secondary, indirect. We also identified recurring categories of change-related organizational factors. The current analysis examines these factors in studies of primary relevance to knowledge translation, which we also coded for intervention readiness to reflect how readily change can be implemented. Preliminary Results and Conclusions: Results centred on five change-related categories: Tailoring the Intervention Message; Institutional Links/Social Networks; Training; Quality of Work Relationships; and Fit to Organization. In particular, networks across institutional and individual levels appeared as prominent pathways for changing healthcare organizations. Power dynamics, positive social relations and team structures also played key roles in implementing change and translating it into practice. We analyzed journals in which first authors of these studies typically publish, and found evidence that management and health sciences remain divided. Bridging these disciplines through research syntheses promises a wealth of evidence and insights, well worth mining in the search for change that works in healthcare transformation. PMID

  18. Strategic implementation of integrated water resources management in Mozambique: An A’WOT analysis

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    The Integrated Water Resources Management (IWRM) paradigm has become an important framework in development and management of water resources. Many countries in the Southern Africa region have begun water sector reforms to align the sector with the IWRM concepts. In 2007 the Mozambican Government started to update the policy and the legal framework of the water sector to foster the application of IWRM concept as a basis for achieving sustainable development. However the steps towards the implementation of this national framework are still in preparation. This research aims to identify and establish a priority ranking of the fundamental factors likely to affect the outcome of the IWRM reforms in Mozambique. This study uses the hybrid multi-criteria decision method A’WOT, a methodology coined by Kurttila et al. (2000). This method relies on the combination of the Strengths, Weaknesses, Opportunities, and Threats (SWOT) technique and the Analytic Hierarchy Process (AHP) technique. Using this procedure it is possible to identify and rank the factors affecting the functioning of a system. The key factors affecting the implementation of the IWRM, analysed in this study, were identified through an expert group discussion. These factors have been grouped into different categories of SWOT. Subsequently, the AHP methodology was applied to obtain the relative importance of each factor captured in the SWOT analysis; to this end the authors interviewed a panel of water resources management experts and practitioners. As a result, of this study and the application of the A’WOT methodology, the research identified and ranked the fundamental factors for the success of the IWRM strategy in Mozambique. The results of this study suggest that in Mozambique a planning strategy for the implementation of the IWRM should be guided mainly by combination of interventions in factors falling under opportunity and weakness SWOT groups.

  19. Implementation and management of a biomedical observation dictionary in a large healthcare information system

    PubMed Central

    Vandenbussche, Pierre-Yves; Cormont, Sylvie; André, Christophe; Daniel, Christel; Delahousse, Jean; Charlet, Jean; Lepage, Eric

    2013-01-01

    Objective This study shows the evolution of a biomedical observation dictionary within the Assistance Publique Hôpitaux Paris (AP-HP), the largest European university hospital group. The different steps are detailed as follows: the dictionary creation, the mapping to logical observation identifier names and codes (LOINC), the integration into a multiterminological management platform and, finally, the implementation in the health information system. Methods AP-HP decided to create a biomedical observation dictionary named AnaBio, to map it to LOINC and to maintain the mapping. A management platform based on methods used for knowledge engineering has been put in place. It aims at integrating AnaBio within the health information system and improving both the quality and stability of the dictionary. Results This new management platform is now active in AP-HP. The AnaBio dictionary is shared by 120 laboratories and currently includes 50 000 codes. The mapping implementation to LOINC reaches 40% of the AnaBio entries and uses 26% of LOINC records. The results of our work validate the choice made to develop a local dictionary aligned with LOINC. Discussion and Conclusions This work constitutes a first step towards a wider use of the platform. The next step will support the entire biomedical production chain, from the clinician prescription, through laboratory tests tracking in the laboratory information system to the communication of results and the use for decision support and biomedical research. In addition, the increase in the mapping implementation to LOINC ensures the interoperability allowing communication with other international health institutions. PMID:23635601

  20. NASA-Langley Research Center's Aircraft Condition Analysis and Management System Implementation

    NASA Technical Reports Server (NTRS)

    Frye, Mark W.; Bailey, Roger M.; Jessup, Artie D.

    2004-01-01

    This document describes the hardware implementation design and architecture of Aeronautical Radio Incorporated (ARINC)'s Aircraft Condition Analysis and Management System (ACAMS), which was developed at NASA-Langley Research Center (LaRC) for use in its Airborne Research Integrated Experiments System (ARIES) Laboratory. This activity is part of NASA's Aviation Safety Program (AvSP), the Single Aircraft Accident Prevention (SAAP) project to develop safety-enabling technologies for aircraft and airborne systems. The fundamental intent of these technologies is to allow timely intervention or remediation to improve unsafe conditions before they become life threatening.

  1. Implementation of occupational health service improvements through application of total quality management processes.

    PubMed

    Thomas, Elizabeth Anne

    2011-06-01

    The occupational health services department for a manufacturing division of a high-technology firm was redesigned from an outsourced model, in which most services were provided by an outside clinic vendor, to an in-house service model, in which services were provided by an on-site nurse practitioner. The redesign and implementation, accomplished by a cross-functional team using Total Quality Management processes, resulted in a comprehensive occupational health services department that realized significant cost reduction, increased compliance with regulatory and company requirements, and improved employee satisfaction. Implications of this project for occupational health nurses are discussed.

  2. Daily Planet Redesign: eZ Publish Web Content Management Implementation

    NASA Technical Reports Server (NTRS)

    Dutra, Jayne E.

    2006-01-01

    This viewgraph presentation reviews the process of the redesign of the Daily . Planet news letter as a content management implementation project. This is a site that is an internal news site that acts as a communication vehicle for a large volume of content. The Objectives for the site redesign was: (1) Clean visual design, (2) Facilitation of publication processes, (3) More efficient maintenance mode, (4) Automated publishing to internal portal, (5) Better navigation through improved site IA, (6) Archiving and retrieval functionality, (7) Back to basics on fundamental business goals. The CM is a process not a software package

  3. Department of Energy's second-year implementation of the Federal Managers' Financial Integrity Act

    SciTech Connect

    Not Available

    1985-10-17

    GAO reviewed the implementation of the Federal Managers' Financial Integrity Act of 1982 by 23 federal departments and agencies. The act was intended to help reduce fraud, waste, and abuse in federal government operations by requiring agencies to assess and report annually to the President and the Congress on the adequacy of their internal controls and accounting systems. This report highlights the progress made and problems encountered by the Department of Energy (DOE) during its second year under the act. GAO evaluated DOE's efforts to correct internal control weaknesses and improve its accounting systems. GAO discusses ways in which DOE can strengthen its internal control and accounting system evaluations.

  4. Institutional Control Policies and Implementation for the Area 5 and Area 3 Radioactive Waste Management Sites

    SciTech Connect

    Vefa Yucel, Greg Shott, Denise Wieland, et al.

    2007-11-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has implemented varying institutional control policies in performance assessment/composite analysis (PA/CA) calculations for the Area 5 and Area 3 Radioactive Waste Management Sites (RWMSs) (Shott et al., 1998; 2000; Bechtel Nevada [BN] and Neptune and Company Inc. [Neptune], 2006). The facilities are within the actively maintained boundaries of the Nevada Test Site (NTS) that are enforced by NNSA/NSO. Under current policies, access required for exposure of the member of public (MOP) or the inadvertent human intruder (IHI) is prohibited. Uncertainties affecting institutional control policies are the duration and effectiveness of the controls during the post-closure period. Implementing a uniform set of institutional control policies for the RWMSs that encompasses waste management and environmental restoration programs and is consistent with the end-state vision for the environmental management programs for the NTS (DOE, 2006) is a primary goal of the maintenance program. The NNSA/NSO Performance Management Plan (DOE, 2002) complies with DOE Policy P455.1, 'Use of Risk-Based End States' (DOE, 2003a). Expected future land uses are a driver in selecting acceptable end state conditions and clean-up goals for the NTS. NNSA/NSO Environmental Management's (EM's) land management assumptions and framework for Environmental Management activities are as follows: The NTS will remain under federal control in perpetuity as an NNSA test site, and the large buffer zone surrounding the NTS (the Nevada Test and Training Range) is assumed to remain under the control of the U.S. Air Force. There are no plans for transfer of any NTS lands to other agencies or public entities. Access will continue to be restricted to the NTS and the surrounding areas. For management purposes, NNSA/NV EM activities have been established based on the source of contamination and type of waste

  5. Implementation planning and progress on physical activity goals: the mediating role of life-management strategies.

    PubMed

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-03-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects. Results from a sample of 131undergraduate students showed that, as a composite, life-management strategies fully mediated the relationship between planning and goal progress. More specifically, decomposing the effects demonstrated that only elective selection and compensation mediated the association between planning and greater progress on a personal physical activity goal. Results are discussed in light of their practical implications and contributions to the personal goal literature.

  6. Chronic grief management for dementia caregivers in transition: intervention development and implementation.

    PubMed

    Paun, Olimpia; Farran, Carol J

    2011-12-01

    Research reveals that Alzheimer's disease (AD) caregivers do not relinquish their role after placing a family member in long-term care. Caregivers report increased emotional upset around the time of placement, with sustained losses over time leading to chronic grief. Chronic grief increases caregivers' risk for depression and suicide. There are no documented interventions designed to decrease caregivers' chronic grief post placement. The Chronic Grief Management Intervention (CGMI) builds on existing evidence to target caregivers' chronic grief in the transition of a family member into long-term care. The intervention is structured into three major components: (a) knowledge, (b) communication and conflict resolution skills, and (c) chronic grief management skills. The 12-week intervention was pilot tested with 34 caregivers for feasibility and preliminary effects on caregiver skill, knowledge, chronic grief, and depression. This article presents a general study description while focusing on the development and implementation of the CGMI. PMID:22084962

  7. The TRITON Project: Design and Implementation of an Integrative Translational Research Information Management Platform.

    PubMed

    Payne, Philip R O; Borlawsky, Tara B; Stephens, William; Barrett, Matthew C; Nguyen-Pham, Tri; Greaves, Andrew W

    2010-11-13

    Multi-site consortia have become the preferred setting for team-based translational research programs. Such consortia are able to facilitate increased breadth and depth of basic science and clinical research activities, but also present numerous challenges related to data collection, analysis, storage, and exchange. The Chronic Lymphocytic Leukemia (CLL) Research Consortium (CRC), a s a prototypical instance of such a consortia, uses numerous loosely coupled web applications to address its informatics needs. Over a decade of operations have allowed the CRC to identify usability and computational limitations relative to the preceding information management architecture. In response, the CRC has launched the TRITON project, with the ultimate objective of developing an open-source, extensible, and fully integrative translational research information management platform. In this manuscript, we describe the architecture, design processes, and initial implementation of thatplatform.

  8. Implementation of an Infectious Disease Fellow-Managed Penicillin Allergy Skin Testing Service

    PubMed Central

    Heil, Emily L.; Bork, Jacqueline T.; Schmalzle, Sarah A.; Kleinberg, Michael; Kewalramani, Anupama; Gilliam, Bruce L.; Buchwald, Ulrike K.

    2016-01-01

    Background. A large percentage of patients presenting to acute care facilities report penicillin allergies that are associated with suboptimal antibiotic therapy. Penicillin skin testing (PST) can clarify allergy histories but is often limited by access to testing. We aimed to implement an infectious diseases (ID) fellow-managed PST program and to assess the need for PST via national survey. Methods. We conducted a prospective observational study of the implementation of an ID fellow-managed penicillin allergy skin testing service. The primary outcome of the study was to assess the feasibility and acceptability of an ID fellow-managed PST service and its impact on the optimization of antibiotic selection. In addition, a survey of PST practices was sent out to all ID fellowship program directors in the United States. Results. In the first 11 months of the program, 90 patients were assessed for PST and 76 patients were tested. Of the valid tests, 96% were negative, and 84% with a negative test had antibiotic changes; 63% received a narrower spectrum antibiotic, 80% received more effective therapy, and 61% received more cost-effective therapy. The majority of survey of respondents (n = 50) indicated that overreporting of penicillin allergy is a problem in their practice that affects antibiotic selection but listed inadequate personnel and time as the main barriers to PST. Conclusions. Inpatient PST can be successfully managed by ID fellows, thereby promoting optimal antibiotic use in patients reporting penicillin allergies. This model can increase access to PST at institutions without adequate access to allergists while also providing an important educational experience to ID trainees. PMID:27704011

  9. Integrated constructed wetlands: water management as a land-use issue, implementing the 'Ecosystem Approach'.

    PubMed

    Harrington, R; Carroll, P; Cook, S; Harrington, C; Scholz, M; McInnes, R J

    2011-01-01

    Awareness of the need for social, economic and environmental coherence in the management of water is becoming evermore apparent. Water supply as well as treatment is becoming more costly; a challenge that is not only limited to developing countries. The use of wetlands, natural and constructed, is now more widely accepted as a means of tackling a range of problems in water management to deliver this coherence. The use of 16 Integrated Constructed Wetlands that mimic shallow, emergent-vegetated, palustrine wetlands in a 2,500 ha catchment in County Waterford, Southeast Ireland, has shown a number of distinct advantages in implementing the all encompassing 'Ecosystem Approach', addressing the key elements for sustainable water management in an intensively used agricultural area. The significant increase in water quality, biodiversity, social amenities and acceptance by the local rural community provided by this 'real' field-scale demonstration show the benefits that such a joined-up approach can have on catchment management in the widest sense.

  10. Evaluation and review of the safety management system implementation in the Royal Thai Air Force

    NASA Astrophysics Data System (ADS)

    Chaiwan, Sakkarin

    This study was designed to determine situation and effectiveness of the safety management system currently implemented in the Royal Thai Air Force. Reviewing the ICAO's SMS and the RTAF's SMS was conducted to identify similarities and differences between the two safety management systems. Later, the researcher acquired safety statistics from the RTAF Safety Center to investigate effectiveness of its safety system. The researcher also collected data to identify other factors affecting effectiveness of the safety system during conducting in-depth interviews. Findings and Conclusions: The study shows that the Royal Thai Air Force has never applied the International Civil Aviation Organization's Safety management System to its safety system. However, the RTAF's SMS and the ICAO's SMS have been developed based on the same concepts. These concepts are from Richard H. Woods's book, Aviation safety programs: A management handbook. However, the effectiveness of the Royal Thai Air Force's safety system is in good stance. An accident rate has been decreasing regularly but there are no known factors to describe the increasing rate, according to the participants' opinion. The participants have informed that there are many issues to be resolved to improve the RTAF's safety system. Those issues are cooperation among safety center's staffs, attitude toward safety of the RTAF senior commanders, and safety standards.

  11. Quality management series. How we implemented TQM in our laboratory and our blood bank.

    PubMed

    Beesley, J; Helton, H D; Merkley, A; Swalberg, E D

    1993-01-01

    Our experience in laboratory and blood services at LDS Hospital within Intermountain Health Care (IHC) is evidence that the theories behind total quality management (TQM) can be implemented into daily work. Some of the changes and results we have seen are increased employee accountability, paradigm shifts, process improvements, assessment using tools and measurement, increased customer and employee satisfaction, and cost savings. Some areas of the new TQM culture that we have focused on and made tremendous strides in are education in continuous quality improvement (CQI), CQI teams, quality councils, vision setting, self-managed work groups, change of management style, and celebrating success. We have learned that changes in culture take time and patience; managers must be willing to change their style; the CQI process and tools must be used; building trust and aligning values are important; education is key; making mistakes is how we learn; a customer focus is vital; significant change follows finding root causes; and we must just do it and not worry about all the little details. To make the change to a TQM culture, an organization must have faith in its employees, educate them, and be customer focused! PMID:10126513

  12. Integrated constructed wetlands: water management as a land-use issue, implementing the 'Ecosystem Approach'.

    PubMed

    Harrington, R; Carroll, P; Cook, S; Harrington, C; Scholz, M; McInnes, R J

    2011-01-01

    Awareness of the need for social, economic and environmental coherence in the management of water is becoming evermore apparent. Water supply as well as treatment is becoming more costly; a challenge that is not only limited to developing countries. The use of wetlands, natural and constructed, is now more widely accepted as a means of tackling a range of problems in water management to deliver this coherence. The use of 16 Integrated Constructed Wetlands that mimic shallow, emergent-vegetated, palustrine wetlands in a 2,500 ha catchment in County Waterford, Southeast Ireland, has shown a number of distinct advantages in implementing the all encompassing 'Ecosystem Approach', addressing the key elements for sustainable water management in an intensively used agricultural area. The significant increase in water quality, biodiversity, social amenities and acceptance by the local rural community provided by this 'real' field-scale demonstration show the benefits that such a joined-up approach can have on catchment management in the widest sense. PMID:22049721

  13. Quality management series. How we implemented TQM in our laboratory and our blood bank.

    PubMed

    Beesley, J; Helton, H D; Merkley, A; Swalberg, E D

    1993-01-01

    Our experience in laboratory and blood services at LDS Hospital within Intermountain Health Care (IHC) is evidence that the theories behind total quality management (TQM) can be implemented into daily work. Some of the changes and results we have seen are increased employee accountability, paradigm shifts, process improvements, assessment using tools and measurement, increased customer and employee satisfaction, and cost savings. Some areas of the new TQM culture that we have focused on and made tremendous strides in are education in continuous quality improvement (CQI), CQI teams, quality councils, vision setting, self-managed work groups, change of management style, and celebrating success. We have learned that changes in culture take time and patience; managers must be willing to change their style; the CQI process and tools must be used; building trust and aligning values are important; education is key; making mistakes is how we learn; a customer focus is vital; significant change follows finding root causes; and we must just do it and not worry about all the little details. To make the change to a TQM culture, an organization must have faith in its employees, educate them, and be customer focused!

  14. Constraints to implementing an equity-promoting staff allocation policy: understanding mid-level managers' and nurses' perspectives affecting implementation in South Africa.

    PubMed

    Scott, Vera; Mathews, Verona; Gilson, Lucy

    2012-03-01

    Much of current research on issues of equity in low- and middle-income countries focuses on uncovering and describing the extent of inequities in health status and health service provision. In terms of policy responses to inequity, there is a growing body of work on resource reallocation strategies. However, little published work exists on the challenges of implementing new policies intended to improve equity in health status or health service delivery. While the appropriateness of the technical content of policies clearly influences whether or not they promote equity, policy analysis theory suggests that it is important to consider how the processes of policy development and implementation influence policy achievements. Drawing on actor analysis and implementation theory, we seek to understand some of the dynamics surrounding the proposed implementation of one set of South African staff allocation strategies responding to broader equity-oriented policy mandates. These proposals were developed by a team of researchers and mid-level managers in 2003 and called for the reallocation of staff between better- and lesser-resourced districts in the Cape Town Metropolitan region to reduce broader resource allocation inequities. This was felt necessary because up to 70% of public health expenditure was on staff, and new financing for health care was unavailable. We focus on the views and reactions of the two sets of implementing actors most directly influenced by the proposed staff reallocation strategies: district health managers and clinic nurses. One strength of this analysis is that it gives voice to the experience of the district level--the key but much neglected implementation arena in a decentralized health system. The paper's findings unpack differences in these actors' positions on the proposed strategies, and explore the factors influencing their positions. Ultimately, we show how a lack of trust in the relationships between mid-level managers and nurse service

  15. Healthcare Managers' Experiences of Leading the Implementation of Video Conferencing in Discharge Planning Sessions: An Interview Study.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-03-01

    This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.

  16. Extent of Implementing the Total Quality Management Principles by Academic Departments Heads at Najran University from Faculty Members' Perspectives

    ERIC Educational Resources Information Center

    Al-Din, Hesham Moustafa Kamal; Abouzid, Mohamed Mahmoud

    2016-01-01

    This study aimed to identify the implementing degree of Total Quality Management (TQM) principals by Academic Departmental Heads (ADH) at the Najran University from faculty members' perspectives. It also aimed to determine significant differences between the average estimate of sample section of faculty members about the implementing degree of TQM…

  17. Total Quality Management in Higher Education: Clearing the Hurdles. A Survey on Strategies for Implementing Quality Management Practices in Higher Education. A GOAL/QPC Application Report.

    ERIC Educational Resources Information Center

    Seymour, Daniel

    Based on a survey of Quality Management (QM) practitioners at 21 colleges, this study presents the 10 most difficult implementation hurdles to QM in higher education and a set of hurdle-clearing strategies. The hurdles are: (1) lack of time to implement QM; (2) perception that QM is something for janitorial and housing staffs but not applicable to…

  18. What changes in inflammatory bowel disease management can be implemented today?

    PubMed

    Louis, Edouard; Baumgart, Daniel C; Ghosh, Subrata; Gomollón, Fernando; Hanauer, Stephen; Hart, Ailsa; Irving, Peter

    2012-02-01

    Innovative ideas are required to improve the management of inflammatory bowel disease and to share best practice that can be implemented into clinical practice today. The use of biomarkers such as calprotectin to monitor disease progression and treatment response could help to improve management of inflammatory bowel disease, but several strategies need to be implemented to make this a reality in clinical practice. The use of calprotectin as a biomarker and the manipulation of the thiopurine pathway to extend the use of current therapies are examples of how basic research can translate into patient benefit. Translational research into the use of microbiota and predictive factors for response and toxicity to drugs, may provide future clinical applications. Global improvement in care in inflammatory bowel disease could also be advanced by improving service provision. For example, the establishment of 'Centres of Excellence', a global interactive inflammatory disease map, and the alignment of processes and standards of care within treatment centres may help to achieve better outcomes for patients with inflammatory bowel disease. Realization of this goal, as well as a better understanding of the aetiology of the disease, may be furthered by collaborative efforts between organizations involved in inflammatory bowel disease as well as wider collaboration across countries and globally. PMID:22463933

  19. Implementation of WHO guidelines on management of severe malnutrition in hospitals in Africa.

    PubMed Central

    Deen, Jacqueline L.; Funk, Matthias; Guevara, Victor C.; Saloojee, Haroon; Doe, James Y.; Palmer, Ayo; Weber, Martin W.

    2003-01-01

    OBJECTIVE: To investigate the problems, benefits, feasibility, and sustainability of implementation of WHO guidelines on management of severe malnutrition. METHODS: A postal survey invited staff from 12 African hospitals to participate in the study. Five hospitals were evaluated and two were selected to take part in the study: a district hospital in South Africa and a mission hospital in Ghana. At an initial visit, an experienced paediatrician reviewed the situation in the hospitals and introduced the principles of the guidelines through a participatory approach. During a second visit about six months later, the paediatrician reviewed the feasibility and sustainability of the introduced changes and helped find solutions to problems. At a final visit after one year, the paediatrician reassessed the overall situation. FINDINGS: Malnutrition management practices improved at both hospitals. Measures against hypoglycaemia, hypothermia, and infection were strengthened. Early, frequent feeding was established as a routine practice. Some micronutrients for inclusion in the diet were not locally available and needed to be imported. Problems were encountered with monitoring of weight gain and introducing a rehydration solution for malnutrition. CONCLUSION: Implementation of the main principles of the WHO guidelines on severe malnutrition was feasible, affordable, and sustainable at two African hospitals. The guidelines could be improved by including suggestions on how to adapt specific recommendations to local situations. The guidelines are well supported by experience and published reports, but more information is needed about some components and their impact on mortality. PMID:12764489

  20. Class D Management Implementation Approach of the First Orbital Mission of the Earth Venture Series

    NASA Technical Reports Server (NTRS)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-01-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  1. What changes in inflammatory bowel disease management can be implemented today?

    PubMed

    Louis, Edouard; Baumgart, Daniel C; Ghosh, Subrata; Gomollón, Fernando; Hanauer, Stephen; Hart, Ailsa; Irving, Peter

    2012-02-01

    Innovative ideas are required to improve the management of inflammatory bowel disease and to share best practice that can be implemented into clinical practice today. The use of biomarkers such as calprotectin to monitor disease progression and treatment response could help to improve management of inflammatory bowel disease, but several strategies need to be implemented to make this a reality in clinical practice. The use of calprotectin as a biomarker and the manipulation of the thiopurine pathway to extend the use of current therapies are examples of how basic research can translate into patient benefit. Translational research into the use of microbiota and predictive factors for response and toxicity to drugs, may provide future clinical applications. Global improvement in care in inflammatory bowel disease could also be advanced by improving service provision. For example, the establishment of 'Centres of Excellence', a global interactive inflammatory disease map, and the alignment of processes and standards of care within treatment centres may help to achieve better outcomes for patients with inflammatory bowel disease. Realization of this goal, as well as a better understanding of the aetiology of the disease, may be furthered by collaborative efforts between organizations involved in inflammatory bowel disease as well as wider collaboration across countries and globally.

  2. [Hospital governance: between crisis management and implementation of public health policy].

    PubMed

    Bréchat, Pierre-Henri; Antoine, Leenhardt; Mathieu-Grenouilleau, Marie-Christine; Rymer, Roland; Matisse, François; Baraille, Denis; Beaufils, Philippe

    2010-01-01

    The implementation of the recent act to amend the law on hospitals, patient health and territories (HPST Law) completes the reform of the organization and governance of health facilities, which was announced in 2002 by the "Hospital 2007" plan. What kind of assessments and perspectives can be considered and envisaged for these Hospital Activity Poles? We compared our experience with a review of the professional and scientific literature in order to stimulate answers to these questions for advocacy purposes prior to the Act's implementation. The hospital's cluster of activities should reinforce--not call into question the core activities and the financial stability of the facility, while respecting the contract on agreed objectives and the necessary means and resources to meet the health needs of the catchment population as well as national priorities. Although significant, but limited, successes exist, five obstacles to hospital reorganization can be identified. These include, for example: lack of delegation of management and centralization of decisions, the heterogeneity of numerous Hospital Activity Poles or problems related to timing. These obstacles may cause strain, or put the Hospital Activity Poles and the health facilities in a difficult situation with respect to their dynamics. This may show that the State and social health insurance should steer and direct public health policy and that the delegation of management roles and responsibilities to the Hospital Activity Poles should be addressed.

  3. Implementation of a platform dedicated to the biomedical analysis terminologies management

    PubMed Central

    Cormont, Sylvie; Vandenbussche, Pierre-Yves; Buemi, Antoine; Delahousse, Jean; Lepage, Eric; Charlet, Jean

    2011-01-01

    Background and objectives. Assistance Publique - Hôpitaux de Paris (AP-HP) is implementing a new laboratory management system (LMS) common to the 12 hospital groups. First step to this process was to acquire a biological analysis dictionary. This dictionary is interfaced with the international nomenclature LOINC, and has been developed in collaboration with experts from all biological disciplines. In this paper we describe in three steps (modeling, data migration and integration/verification) the implementation of a platform for publishing and maintaining the AP-HP laboratory data dictionary (AnaBio). Material and Methods. Due to data complexity and volume, setting up a platform dedicated to the terminology management was a key requirement. This is an enhancement tackling identified weaknesses of previous spreadsheet tool. Our core model allows interoperability regarding data exchange standards and dictionary evolution. Results. We completed our goals within one year. In addition, structuring data representation has lead to a significant data quality improvement (impacting more than 10% of data). The platform is active in the 21 hospitals of the institution spread into 165 laboratories. PMID:22195205

  4. Implementation of a solvent management program to control paint shop volatile organic compounds

    SciTech Connect

    Floer, M.M.; Hicks, B.H.

    1997-12-31

    The majority of automobile assembly plant volatile organic compound (VOC) emissions are generated from painting operations. Typical paint operations generate more than 90 percent of the total plant emissions and, up to, 50 percent can be released by cleaning sources. Plant practices which contribute to the release of VOC emissions include the cleaning of paint lines and equipment, tanks, spray booths, floors and vehicles. Solvents continue to be the largest contributing source of VOC emissions in an automotive paint shop. To reduce overall VOC emissions, environmental regulations and guidelines were introduced under the Clean Air Act; Pollution Prevention and Waste Minimization programs, Control Techniques, and special air permit conditions. The introduction of these regulations and guidelines has driven industry toward continual refinement of their present cleaning methods while pursuing new techniques and technologies. Industry has also shown a proactive approach by introducing new waterborne and powder coating paint technologies to reduce overall emissions. As new paint technologies are developed and introduced, special attention must be given to the types of materials utilized for cleaning. The development and implementation of a solvent management program allows a facility to standardize a program to properly implement materials, equipment, technologies and work practices to reduce volatile organic compound emissions, meet strict cleaning requirements posed by new paint technologies and produce a vehicle which meets the high quality standards of the customer. This paper will assess the effectiveness of a solvent management program by examining pollution prevention initiatives and data from four different painting operations.

  5. Implementing an organization-wide quality improvement initiative: insights from project leads, managers, and frontline nurses.

    PubMed

    Jeffs, Lianne P; Lo, Joyce; Beswick, Susan; Campbell, Heather

    2013-01-01

    With the movement to advance quality care and improve health care outcomes, organizations have increasingly implemented quality improvement (QI) initiatives to meet these requirements. Key to implementation success is the multilevel involvement of frontline clinicians and leadership. To explore the perceptions and experiences of frontline nurses, project leads, and managers associated with an organization-wide initiative aimed at engaging nurses in quality improvement work. To address the aims of this study, a qualitative research approach was used. Two focus groups were conducted with a total of 13 nurse participants, and individual interviews were done with 10 managers and 6 project leads. Emergent themes from the interview data included the following: improving care in a networked approach; driving QI and having a sense of pride; and overcoming challenges. Specifically, our findings elucidate the value of communities of practice and ongoing mentorship for nurses as key strategies to acquire and apply QI knowledge to a QI project on their respective units. Key challenges emerged including workload and time constraints, as well as resistance to change from staff. Our study findings suggest that leaders need to provide learning opportunities and protected time for frontline nurses to participate in QI projects. PMID:23744468

  6. Class D management implementation approach of the first orbital mission of the Earth Venture series

    NASA Astrophysics Data System (ADS)

    Wells, James E.; Scherrer, John; Law, Richard; Bonniksen, Chris

    2013-09-01

    A key element of the National Research Council's Earth Science and Applications Decadal Survey called for the creation of the Venture Class line of low-cost research and application missions within NASA (National Aeronautics and Space Administration). One key component of the architecture chosen by NASA within the Earth Venture line is a series of self-contained stand-alone spaceflight science missions called "EV-Mission". The first mission chosen for this competitively selected, cost and schedule capped, Principal Investigator-led opportunity is the CYclone Global Navigation Satellite System (CYGNSS). As specified in the defining Announcement of Opportunity, the Principal Investigator is held responsible for successfully achieving the science objectives of the selected mission and the management approach that he/she chooses to obtain those results has a significant amount of freedom as long as it meets the intent of key NASA guidance like NPR 7120.5 and 7123. CYGNSS is classified under NPR 7120.5E guidance as a Category 3 (low priority, low cost) mission and carries a Class D risk classification (low priority, high risk) per NPR 8705.4. As defined in the NPR guidance, Class D risk classification allows for a relatively broad range of implementation strategies. The management approach that will be utilized on CYGNSS is a streamlined implementation that starts with a higher risk tolerance posture at NASA and that philosophy flows all the way down to the individual part level.

  7. System for Configuring Modular Telemetry Transponders

    NASA Technical Reports Server (NTRS)

    Varnavas, Kosta A. (Inventor); Sims, William Herbert, III (Inventor)

    2014-01-01

    A system for configuring telemetry transponder cards uses a database of error checking protocol data structures, each containing data to implement at least one CCSDS protocol algorithm. Using a user interface, a user selects at least one telemetry specific error checking protocol from the database. A compiler configures an FPGA with the data from the data structures to implement the error checking protocol.

  8. Implementation of the Integrated Management of Childhood Illnesses strategy: challenges and recommendations in Botswana

    PubMed Central

    Mupara, Lucia U.; Lubbe, Johanna C.

    2016-01-01

    Background Under-five mortality has been a major public health challenge from time immemorial. In response to this challenge, the World Health Organization and the United Nations Children's Fund developed the Integrated Management of Childhood Illnesses (IMCI) strategy and presented it to the whole world as a key approach to reduce child morbidity and mortality. Botswana started to implement the IMCI strategy in 1998. Reductions in the under-five mortality rate (U5MR) have been documented, although the reduction is not on par with the expected Millennium Development Goal 4 predictions. Design A quantitative study was done to identify the problems IMCI implementers face when tending children under 5 years in the Gaborone Health District of Botswana. The study population was made up of all the IMCI-trained and registered nurses, and systematic sampling was used to randomly select study participants. Questionnaires were used to collect data. Results The study findings indicated challenges related to low training coverage, health systems, and the unique features of the IMCI strategy. Conclusions The comprehensive implementation of the IMCI strategy has the potential to significantly influence the U5MR in Botswana. PMID:26899774

  9. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  10. Microbial performance of food safety management systems implemented in the lamb production chain.

    PubMed

    Osés, S M; Luning, P A; Jacxsens, L; Santillana, S; Jaime, I; Rovira, J

    2012-01-01

    The actual microbial status of the lamb production chain at three slaughterhouses, one processing plant, and five butcher shops selling whole or cut lamb carcasses to consumers was assessed with a previously developed microbial assessment scheme. All studied establishments had a food safety management system (FSMS) that was implemented according to legislative requirements. Microbial safety level profiles were constructed for each establishment and provided clear indications of which pathogens, hygiene indicators, or utility parameters required attention to improve the performance of the microbiological control protocols of the implemented FSMS. The highest contamination was found in the slaughterhouses in samples taken from the meat products (aerobic mesophilic plate counts [AMPs] of 3.40 to 6.63 log CFU/cm(2) and Enterobacteriaceae counts of 1.00 to 4.62 log CFU/cm(2)), contact surfaces (AMPs of 2.44 to 8.92 log CFU/cm(2)), and operators' hands and/or gloves (AMPs of 2.84 to 8.09 log CFU/cm(2)), especially after hide removal and evisceration. The microbial assessment scheme is a useful tool for providing insight into the actual microbiological results achieved with an FSMS implemented in establishments at various stages along the lamb production chain.

  11. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations. PMID:16854805

  12. The economic and environmental consequences of implementing nitrogen-efficient technologies and management practices in agriculture.

    PubMed

    Zhang, Xin; Mauzerall, Denise L; Davidson, Eric A; Kanter, David R; Cai, Ruohong

    2015-03-01

    Technologies and management practices (TMPs) that reduce the application of nitrogen (N) fertilizer while maintaining crop yields can improve N use efficiency (NUE) and are important tools for meeting the dual challenges of increasing food production and reducing N pollution. However, because farmers operate to maximize their profits, incentives to implement TMPs are limited, and TMP implementation will not always reduce N pollution. Therefore, we have developed the NUE Economic and Environmental impact analytical framework (NUE) to examine the economic and environmental consequences of implementing TMPs in agriculture, with a specific focus on farmer profits, N fertilizer consumption, N losses, and cropland demand. Our analytical analyses show that impact of TMPs on farmers' economic decision-making and the environment is affected by how TMPs change the yield ceiling and the N fertilization rate at the ceiling and by how the prices of TMPs, fertilizer, and crops vary. Technologies and management practices that increase the yield ceiling appear to create a greater economic incentive for farmers than TMPs that do not but may result in higher N application rates and excess N losses. Nevertheless, the negative environmental impacts of certain TMPs could be avoided if their price stays within a range determined by TMP yield response, fertilizer price, and crop price. We use a case study on corn production in the midwestern United States to demonstrate how NUE can be applied to farmers' economic decision-making and policy analysis. Our NUE framework provides an important tool for policymakers to understand how combinations of fertilizer, crop, and TMP prices affect the possibility of achieving win-win outcomes for farmers and the environment. PMID:26023951

  13. Implementing total quality management in an academic surgery setting: lessons learned.

    PubMed

    Townes, C; Petit, B; Young, B

    1995-01-01

    Total Quality Management, a philosophy developed by W. Edwards Deming, has been used successfully in many countries and in many types of organizations to improve the quality of processes. The system is based upon the scientific method and provides the ability to solve long-standing, recalcitrant problems. The application of the TQM philosophy to health care, although recommended by many medical economists, is still in its infancy. At our medical center, three departments (Surgery, Anesthesiology, and Operating Room Services) joined forces to implement TQM. Critical activities early in implementation included establishing a Steering Committee, training key employees, providing systems for communicating TQM activities, and developing the leadership, facilitator, and other resources needed to support teams. Two of our first teams studied very different processes (one in the Operating Room, the other in outpatient Surgery clinics), providing many useful insights regarding keys to successful application of the TQM philosophy. We have learned strategies for increasing acceptance of and participation in TQM efforts on the part of staff members and, in particular, physicians, and for initiating the cultural change needed for TQM. Although the teams have met with resistance to behavioral changes and a lack of full support from some upper-level administrators in the Medical Center and the Hospital, most of them have been quite successful in improving the processes under study. We conclude that, with the proper leadership and facilitation, the TQM philosophy can be successfully implemented in the health care environment. Total Quality Management (TQM) as a system for improving the quality of processes has been successful in many countries throughout the world for organizations offering a wide variety of products and services. This article will describe specific TQM endeavors, both successful and unsuccessful, undertaken in an academic surgery department in the United States

  14. Usability and Acceptance of the Librarian Infobutton Tailoring Environment: An Open Access Online Knowledge Capture, Management, and Configuration Tool for OpenInfobutton

    PubMed Central

    Cimino, James J; Del Fiol, Guilherme

    2015-01-01

    Background The Librarian Infobutton Tailoring Environment (LITE) is a Web-based knowledge capture, management, and configuration tool with which users can build profiles used by OpenInfobutton, an open source infobutton manager, to provide electronic health record users with context-relevant links to online knowledge resources. Objective We conducted a multipart evaluation study to explore users’ attitudes and acceptance of LITE and to guide future development. Methods The evaluation consisted of an initial online survey to all LITE users, followed by an observational study of a subset of users in which evaluators’ sessions were recorded while they conducted assigned tasks. The observational study was followed by administration of a modified System Usability Scale (SUS) survey. Results Fourteen users responded to the survey and indicated good acceptance of LITE with feedback that was mostly positive. Six users participated in the observational study, demonstrating average task completion time of less than 6 minutes and an average SUS score of 72, which is considered good compared with other SUS scores. Conclusions LITE can be used to fulfill its designated tasks quickly and successfully. Evaluators proposed suggestions for improvements in LITE functionality and user interface. PMID:26621250

  15. Implementation of a Contingency Management-Based Intervention in a Community Supervision Setting: Clinical Issues and Recommendations

    ERIC Educational Resources Information Center

    Trotman, Adria J.; Taxman, Faye S.

    2011-01-01

    A cognitive-behaviorally based substance abuse treatment program was implemented within a community supervision setting. This program included a goals group that used a contingency management component and included the probation agent as a part of the treatment. In this article, the authors describe the contingency management component of the…

  16. "Not" a One-Size-Fits-All Solution: Lessons Learned from Implementing an Electronic Resources Management System in Three Days

    ERIC Educational Resources Information Center

    Pan, Denise

    2009-01-01

    Auraria Library purchased Innovative Interfaces, Inc.'s Millennium Electronic Resources Management (ERM) to manage data about acquisitions, licensing, troubleshooting, and usage statistics of electronic resources. After 3 days of implementation, the software vendor enabled resources records to display. As a result, the electronic resources team…

  17. Principal Leadership and School Culture with a School-Wide Implementation of Professional Crisis Management: A Redemptive v. Punitive Model

    ERIC Educational Resources Information Center

    Adams, Mark Thomas

    2013-01-01

    This qualitative study investigated the nature of the relationship between principal leadership and school culture within a school-wide implementation of Professional Crisis Management (PCM). PCM is a comprehensive and fully integrated system designed to manage crisis situations effectively, safely, and with dignity. While designed primarily to…

  18. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  19. An evaluation and implementation of rule-based Home Energy Management System using the Rete algorithm.

    PubMed

    Kawakami, Tomoya; Fujita, Naotaka; Yoshihisa, Tomoki; Tsukamoto, Masahiko

    2014-01-01

    In recent years, sensors become popular and Home Energy Management System (HEMS) takes an important role in saving energy without decrease in QoL (Quality of Life). Currently, many rule-based HEMSs have been proposed and almost all of them assume "IF-THEN" rules. The Rete algorithm is a typical pattern matching algorithm for IF-THEN rules. Currently, we have proposed a rule-based Home Energy Management System (HEMS) using the Rete algorithm. In the proposed system, rules for managing energy are processed by smart taps in network, and the loads for processing rules and collecting data are distributed to smart taps. In addition, the number of processes and collecting data are reduced by processing rules based on the Rete algorithm. In this paper, we evaluated the proposed system by simulation. In the simulation environment, rules are processed by a smart tap that relates to the action part of each rule. In addition, we implemented the proposed system as HEMS using smart taps.

  20. Tools for beach health data management, data processing, and predictive model implementation

    USGS Publications Warehouse

    ,

    2013-01-01

    This fact sheet describes utilities created for management of recreational waters to provide efficient data management, data aggregation, and predictive modeling as well as a prototype geographic information system (GIS)-based tool for data visualization and summary. All of these utilities were developed to assist beach managers in making decisions to protect public health. The Environmental Data Discovery and Transformation (EnDDaT) Web service identifies, compiles, and sorts environmental data from a variety of sources that help to define climatic, hydrologic, and hydrodynamic characteristics including multiple data sources within the U.S. Geological Survey and the National Oceanic and Atmospheric Administration. The Great Lakes Beach Health Database (GLBH-DB) and Web application was designed to provide a flexible input, export, and storage platform for beach water quality and sanitary survey monitoring data to compliment beach monitoring programs within the Great Lakes. A real-time predictive modeling strategy was implemented by combining the capabilities of EnDDaT and the GLBH-DB for timely, automated prediction of beach water quality. The GIS-based tool was developed to map beaches based on their physical and biological characteristics, which was shared with multiple partners to provide concepts and information for future Web-accessible beach data outlets.

  1. An evaluation and implementation of rule-based Home Energy Management System using the Rete algorithm.

    PubMed

    Kawakami, Tomoya; Fujita, Naotaka; Yoshihisa, Tomoki; Tsukamoto, Masahiko

    2014-01-01

    In recent years, sensors become popular and Home Energy Management System (HEMS) takes an important role in saving energy without decrease in QoL (Quality of Life). Currently, many rule-based HEMSs have been proposed and almost all of them assume "IF-THEN" rules. The Rete algorithm is a typical pattern matching algorithm for IF-THEN rules. Currently, we have proposed a rule-based Home Energy Management System (HEMS) using the Rete algorithm. In the proposed system, rules for managing energy are processed by smart taps in network, and the loads for processing rules and collecting data are distributed to smart taps. In addition, the number of processes and collecting data are reduced by processing rules based on the Rete algorithm. In this paper, we evaluated the proposed system by simulation. In the simulation environment, rules are processed by a smart tap that relates to the action part of each rule. In addition, we implemented the proposed system as HEMS using smart taps. PMID:25136672

  2. Implementation of a feral cat management program on a university campus.

    PubMed

    Hughes, Kathy L; Slater, Margaret R

    2002-01-01

    In August 1998, Texas AM University implemented on campus a trap-test-vaccinate-alter-return-monitor (TTVARM) program to manage the feral cat population. TTVARM is an internationally recognized term for trapping and neutering programs aimed at management of feral cat populations. In this article we summarize results of the program for the period August 1998 to July 2000. In surgery laboratories, senior veterinary students examined cats that were humanely trapped once a month and tested them for feline leukemia and feline immunodeficiency virus infections, vaccinated, and surgically neutered them. They euthanized cats testing positive for either infectious disease. Volunteers provided food and observed the cats that were returned to their capture sites on campus and maintained in managed colonies. The program placed kittens and tame cats for adoption; cats totaled 158. Of the majority of 158 captured cats, there were less kittens caught in Year 2 than in Year 1. The proportion of tame cats trapped was significantly greater in Year 2 than in Year 1. The prevalence found for feline leukemia and feline immunodeficiency virus ELISA test positives was 5.8% and 6.5%, respectively. Following surgery, 101 cats returned to campus. The project recaptured, retested, and revaccinated more than one-fourth of the cats due for their annual vaccinations. The program placed 32 kittens, juveniles, and tame adults for adoption. The number of cat complaints received by the university's pest control service decreased from Year 1 to Year 2.

  3. Development and implementation of an HSE management system in E and P companies

    SciTech Connect

    Bentley, P.D.; Mundhenk, D.L.; Jones, M.G.; Jong, G. de; Visser, J.P. )

    1995-01-01

    This paper describes the experience to date with safety management systems (SMS's) and describes their implementation after the Piper Alpha disaster and Lord Cullen's report. It also shows the gradual expansion of these systems toward fully integrated health, safety, and environment (HSE) management systems. The authors' company policy, which was clearly stated before publication of Lord Cullen's report, is that work should not start until the appropriate controls are in place. Work based on this policy and on objective-setting SMS's within Shell Intl. Petroleum Mij. (SIPM) E and P coordination started in earnest soon after the publication of the report in Nov. 1990 and has continued without interruption since that time. Objective-setting systems may be defined as systems where the company management sets its own objectives or goals on the basis of functional rather than prescriptive requirements and then goes on to demonstrate how such goals have been, or are being, met. The paper ends with a projection of what may be expected in the future.

  4. Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

    NASA Technical Reports Server (NTRS)

    Counts, Stacy; Kerby, Jerald

    2006-01-01

    Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

  5. Development of an algorithm as an implementation model for a wound management formulary across a UK health economy.

    PubMed

    Stephen-Haynes, J

    2013-12-01

    This article outlines a strategic process for the evaluation of wound management products and the development of an algorithm as an implementation model for wound management. Wound management is an increasingly complex process given the variety of interactive dressings and other devices available. This article discusses the procurement process, access to wound management dressings and the use of wound management formularies within the UK. We conclude that the current commissioners of tissue viability within healthcare organisations need to adopt a proactive approach to ensure appropriate formulary evaluation and product selection, in order to achieve the most beneficial clinical and financial outcomes.

  6. An ontology-based semantic configuration approach to constructing Data as a Service for enterprises

    NASA Astrophysics Data System (ADS)

    Cai, Hongming; Xie, Cheng; Jiang, Lihong; Fang, Lu; Huang, Chenxi

    2016-03-01

    To align business strategies with IT systems, enterprises should rapidly implement new applications based on existing information with complex associations to adapt to the continually changing external business environment. Thus, Data as a Service (DaaS) has become an enabling technology for enterprise through information integration and the configuration of existing distributed enterprise systems and heterogonous data sources. However, business modelling, system configuration and model alignment face challenges at the design and execution stages. To provide a comprehensive solution to facilitate data-centric application design in a highly complex and large-scale situation, a configurable ontology-based service integrated platform (COSIP) is proposed to support business modelling, system configuration and execution management. First, a meta-resource model is constructed and used to describe and encapsulate information resources by way of multi-view business modelling. Then, based on ontologies, three semantic configuration patterns, namely composite resource configuration, business scene configuration and runtime environment configuration, are designed to systematically connect business goals with executable applications. Finally, a software architecture based on model-view-controller (MVC) is provided and used to assemble components for software implementation. The result of the case study demonstrates that the proposed approach provides a flexible method of implementing data-centric applications.

  7. Implementation of Risk Management Tools to improve Soil fertility in Ethiopian Agro Systems

    NASA Astrophysics Data System (ADS)

    García Moreno, Rosario; Ramos Fuentes, Natalia; Gameda, Samuel; Cruz Díaz Álvarez, M.; Selasie, Yihenew G.

    2013-04-01

    Agriculture is one of the activities with the highest degree of edaphoclimatic risk exposure in Ethiopia. The survival of 80The analysis showed that for most of the medium small farmers it is absolutely necessary the use of risk management tools to mitigate or prevent the consequences. A case that has been very interesting is the use of index insurance based on rain and temperature index as indicators of drought. But these projects have several limitations that make difficult its large-scale development. The main problem is to obtain meteorological data, both by the poor infrastructure and the lack of historical records in many parts of the country. The lack of a legal framework at a national level is also a great barrier for the development of these instruments. In addition, the need of further information on the knowledge and opinions of farmers is also fundamental, as well as the implementation of best soil management practices. The results of the project indicated the needs of obtaining information directed from producers, for that reason a questionnaire was developed according to universities working with the producers, introducing the need of doing a regular survey to get the basic information about the area where we plan to make management improvements. In any case, it was found that to get a better performance on the index insurance projects together with the introduction of best management practices at a large-scale, they must be accompanied by social protection programs. This project is financed by the Spanish Agency for International Development Cooperation (AECID), Ministry of Foreign Affairs and Cooperation, through the PCI funding AP/038205/11 and the economical support of the FES though the Program Angeles Alvariño 2013 of Xunta of Galicia

  8. Tool to address green roof widespread implementation effect in flood characteristics for water management planning

    NASA Astrophysics Data System (ADS)

    Tassi, R.; Lorenzini, F.; Allasia, D. G.

    2015-06-01

    In the last decades, new approaches were adopted to manage stormwater as close to its source as possible through technologies and devices that preserve and recreate natural landscape features. Green Roofs (GR) are examples of these devices that are also incentivized by city's stormwater management plans. Several studies show that GR decreases on-site runoff from impervious surfaces, however, the analysis of the effect of widespread implementation of GR in the flood characteristics at the urban basin scale in subtropical areas are little discussed, mainly because of the absence of data. Thereby, this paper shows results related to the monitoring of an extensive modular GR under subtropical weather conditions, the development of a rainfall-runoff model based on the modified Curve Number (CN) and SCS Triangular Unit Hydrograph (TUH) methods and the analysis of large-scale impact of GR by modelling different basins. The model was calibrated against observed data and showed that GR absorbed almost all the smaller storms and reduced runoff even during the most intense rainfall. The overall CN was estimated in 83 (consistent with available literature) with the shape of hydrographs well reproduced. Large-scale modelling (in basins ranging from 0.03 ha to several square kilometers) showed that the widespread use of GRs reduced peak flows (volumes) around 57% (48%) at source and 38% (32%) at the basin scale. Thus, this research validated a tool for the assessment of structural management measures (specifically GR) to address changes in flood characteristics in the city's water management planning. From the application of this model it was concluded that even if the efficiency of GR decreases as the basin scale increase they still provide a good option to cope with urbanization impact.

  9. Development and Implementation of Collaborative e-Infrastructures and Data Management for Global Change Research

    NASA Astrophysics Data System (ADS)

    Allison, M. Lee; Davis, Rowena

    2016-04-01

    An e-infrastructure that supports data-intensive, multidisciplinary research is needed to accelerate the pace of science to address 21st century global change challenges. Data discovery, access, sharing and interoperability collectively form core elements of an emerging shared vision of e-infrastructure for scientific discovery. The pace and breadth of change in information management across the data lifecycle means that no one country or institution can unilaterally provide the leadership and resources required to use data and information effectively, or needed to support a coordinated, global e-infrastructure. An 18-month long process involving ~120 experts in domain, computer, and social sciences from more than a dozen countries resulted in a formal set of recommendations that were adopted in fall, 2015 by the Belmont Forum collaboration of national science funding agencies and international bodies on what they are best suited to implement for development of an e-infrastructure in support of global change research, including: • adoption of data principles that promote a global, interoperable e-infrastructure, that can be enforced • establishment of information and data officers for coordination of global data management and e-infrastructure efforts • promotion of effective data planning and stewardship • determination of international and community best practices for adoption • development of a cross-disciplinary training curriculum on data management and curation The implementation plan is being executed under four internationally-coordinated Action Themes towards a globally organized, internationally relevant e-infrastructure and data management capability drawn from existing components, protocols, and standards. The Belmont Forum anticipates opportunities to fund additional projects to fill key gaps and to integrate best practices into an e-infrastructure to support their programs but that can also be scaled up and deployed more widely. Background

  10. DOE organization and management approach in responding to recommendation 94-2 - The implementation plan

    SciTech Connect

    Widmayer, D.

    1995-12-31

    In March, the Department of Energy (DOE) submitted the Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2, {open_quotes}Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Sites.{close_quotes} This paper discusses the management organization and interactions established to accomplish the tasks developed to respond to the DNFSB Recommendation. The organization of the tasks into six technical areas and the interfaces and connections between the tasks are briefly described. A summary of how each significant part of the DNFSB Recommendation is being addressed is presented. This paper provides a brief introduction to the remaining presentations in this session.

  11. Importance of strategic management in the implementation of private medicine retailer programmes: case studies from three districts in Kenya

    PubMed Central

    2010-01-01

    Abstract Background The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs). Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. Methods The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. Results The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a “resource team”, supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to implementation

  12. Parent Management Training-Oregon Model (PMTO™) in Mexico City: Integrating Cultural Adaptation Activities in an Implementation Model

    PubMed Central

    Baumann, Ana A.; Domenech Rodríguez, Melanie M.; Amador, Nancy G.; Forgatch, Marion S.; Parra-Cardona, J. Rubén

    2015-01-01

    This article describes the process of cultural adaptation at the start of the implementation of the Parent Management Training intervention-Oregon model (PMTO) in Mexico City. The implementation process was guided by the model, and the cultural adaptation of PMTO was theoretically guided by the cultural adaptation process (CAP) model. During the process of the adaptation, we uncovered the potential for the CAP to be embedded in the implementation process, taking into account broader training and economic challenges and opportunities. We discuss how cultural adaptation and implementation processes are inextricably linked and iterative and how maintaining a collaborative relationship with the treatment developer has guided our work and has helped expand our research efforts, and how building human capital to implement PMTO in Mexico supported the implementation efforts of PMTO in other places in the United States. PMID:26052184

  13. Design and implementation of the standards-based personal intelligent self-management system (PICS).

    PubMed

    von Bargen, Tobias; Gietzelt, Matthias; Britten, Matthias; Song, Bianying; Wolf, Klaus-Hendrik; Kohlmann, Martin; Marschollek, Michael; Haux, Reinhold

    2013-01-01

    Against the background of demographic change and a diminishing care workforce there is a growing need for personalized decision support. The aim of this paper is to describe the design and implementation of the standards-based personal intelligent care systems (PICS). PICS makes consistent use of internationally accepted standards such as the Health Level 7 (HL7) Arden syntax for the representation of the decision logic, HL7 Clinical Document Architecture for information representation and is based on a open-source service-oriented architecture framework and a business process management system. Its functionality is exemplified for the application scenario of a patient suffering from congestive heart failure. Several vital signs sensors provide data for the decision support system, and a number of flexible communication channels are available for interaction with patient or caregiver. PICS is a standards-based, open and flexible system enabling personalized decision support. Further development will include the implementation of components on small computers and sensor nodes.

  14. Design and implementation of the standards-based personal intelligent self-management system (PICS).

    PubMed

    von Bargen, Tobias; Gietzelt, Matthias; Britten, Matthias; Song, Bianying; Wolf, Klaus-Hendrik; Kohlmann, Martin; Marschollek, Michael; Haux, Reinhold

    2013-01-01

    Against the background of demographic change and a diminishing care workforce there is a growing need for personalized decision support. The aim of this paper is to describe the design and implementation of the standards-based personal intelligent care systems (PICS). PICS makes consistent use of internationally accepted standards such as the Health Level 7 (HL7) Arden syntax for the representation of the decision logic, HL7 Clinical Document Architecture for information representation and is based on a open-source service-oriented architecture framework and a business process management system. Its functionality is exemplified for the application scenario of a patient suffering from congestive heart failure. Several vital signs sensors provide data for the decision support system, and a number of flexible communication channels are available for interaction with patient or caregiver. PICS is a standards-based, open and flexible system enabling personalized decision support. Further development will include the implementation of components on small computers and sensor nodes. PMID:23542984

  15. Design and Implementation of Surrounding Transaction Plotting and Management System Based on Google Map API

    NASA Astrophysics Data System (ADS)

    Cao, Y. B.; Hua, Y. X.; Zhao, J. X.; Guo, S. M.

    2013-11-01

    With China's rapid economic development and comprehensive national strength growing, Border work has become a long-term and important task in China's diplomatic work. How to implement rapid plotting, real-time sharing and mapping surrounding affairs has taken great significance for government policy makers and diplomatic staff. However, at present the already exists Boundary information system are mainly have problems of Geospatial data update is heavily workload, plotting tools are in a state of serious lack of, Geographic events are difficult to share, this phenomenon has seriously hampered the smooth development of the border task. The development and progress of Geographic information system technology especially the development of Web GIS offers the possibility to solve the above problems, this paper adopts four layers of B/S architecture, with the support of Google maps service, uses the free API which is offered by Google maps and its features of openness, ease of use, sharing characteristics, highresolution images to design and implement the surrounding transaction plotting and management system based on the web development technology of ASP.NET, C#, Ajax. The system can provide decision support for government policy makers as well as diplomatic staff's real-time plotting and sharing of surrounding information. The practice has proved that the system has good usability and strong real-time.

  16. Differences in antiretroviral scale up in three South African provinces: the role of implementation management

    PubMed Central

    2010-01-01

    Background South Africa’s antiretroviral programme is governed by defined national plans, establishing treatment targets and providing funding through ring-fenced conditional grants. However, in terms of the country’s quasi-federal constitution, provincial governments bear the main responsibility for provision of health care, and have a certain amount of autonomy and therefore choice in the way their HIV/AIDS programmes are implemented. Methods The paper is a comparative case study of the early management of ART scale up in three South African provincial governments – Western Cape, Gauteng and Free State – focusing on both operational and strategic dimensions. Drawing on surveys of models of ART care and analyses of the policy process conducted in the three provinces between 2005 and 2007, as well as a considerable body of grey and indexed literature on ART scale up in South Africa, it draws links between implementation processes and variations in provincial ART coverage (low, medium and high) achieved in the three provinces. Results While they adopted similar chronic disease care approaches, the provinces differed with respect to political and managerial leadership of the programme, programme design, the balance between central standardisation and local flexibility, the effectiveness of monitoring and evaluation systems, and the nature and extent of external support and programme partnerships. Conclusions This case study points to the importance of sub-national programme processes and the influence of factors other than financing or human resource capacity, in understanding intervention scale up. PMID:20594370

  17. Pharmacists' views on implementing a disease state management program for low back pain.

    PubMed

    Abdel Shaheed, Christina; Maher, Christopher G; Williams, Kylie A; McLachlan, Andrew J

    2016-01-01

    Pharmacists have the potential to take a lead role in the primary care management of people with acute low back pain. The aim of this study was to investigate pharmacists' views on implementing a care program for people with acute low back pain in the community pharmacy. Recruitment of pharmacists for this study took place between July 2012 and March 2013. A convenience sample of 30 pharmacists who collaborated in recruiting participants for a low back pain clinical trial in Sydney (n=15 pharmacist recruiters and n=15 non-recruiters) completed an open-ended questionnaire. There was no marked variation in responses between the two groups. Participating pharmacists were receptive to the idea of implementing a care program for people with low back pain, highlighting the need for adequate reimbursement and adequate training of staff to ensure it is successful. Pharmacists identified that the follow up of people receiving such a service is dependent on several factors such as effective reminder systems and the proximity of patients to the pharmacy. PMID:25719762

  18. PHYSICIANS' VALUATION OF INDIVIDUAL MEDICATION MANAGEMENT SYSTEM (IMMS) IMPLEMENTATION IN POZNAŃ (POLAND) COMMUNITY PHARMACIES.

    PubMed

    Waszyk-Nowaczyk, Magdalena; Nowak, Malwina; Michalak, Michał; Simon, Marek

    2015-01-01

    The reason of growing Pharmaceutical Care (PC) popularity in Poland and all over the world in recent years is connected with a new idea which separates pharmacists from a stereotype of drug store, dealing only with issuing medicines in adequate doses. There is an intention of emphasizing their qualifications and maximizing the use of them. One of the essential part of PC is preparing Individual Medication Management System (IMMS) which may provide individualized pharmacotherapy for patient. The aim of the study was to assess the physicians' opinion about implementation of IMMS in Polish community pharmacies and to evaluate physician-pharmacist cooperation. A cross sectional study was carried out from April 2013 to December 2013 by a pharmacist (authors' of the study). The survey covered 103 physicians (35.9% men and 64.1% women) providing medical services in Poznań. The respondents obtained an anonymous questionnaire with a brief information about IMMS. The results of the study confirmed that 90.3% of physicians would recommend IMMS to their patients. They believed that 72.8% of the patients would be interested in this service. According to 74.8% of doctors, especially with a specialization in cardiology, family medicine, and without specialty, IMMS might contribute to the PC development (p < 0.0001). The respondents (56.3%) confirmed their collaboration with at least 1 pharmacist and 79.6% declared the possibility of the cooperation by using IMMS. This study provides new data about implementation of IMMS in Poland. This innovatory service could be the chance both for patient and physicians to increase the safety and effectiveness of pharmacotherapy and for pharmacists who are intended to highlight their role as a part of health care system. The physicians' positive opinion provide the opportunity to implement IMMS in Polish community pharmacies.

  19. Private adaptation strategies and implementation in flood risk management: why people do nothing?

    NASA Astrophysics Data System (ADS)

    Karagiorgos, Konstantinos; Thaler, Thomas; Maris, Fotios; Paparrizos, Spyros; Fuchs, Sven

    2015-04-01

    In the past decades, vulnerability assessment has emerged as an important field of research in flood risk management, in particular with respect to climate change and necessary adaptation strategies for the society. Probably starting with Chamber's seminal article on vulnerability, coping and policy (Chambers 1989), and further developed as the causal structure of vulnerability by Bohle (2001) and others, at least two research paradigms exist: an internal side focusing on societal resilience and coping capacities, and an external side targeted at a reduction of negative effects in terms of loss reduction (Fuchs 2009). Despite considerable research effects, however, different definitions and concepts still dominate the debate; it is surely that different scientific disciplines are working with this term: natural scientists, engineers, social scientists or economists, to name just a few. Each discipline defines vulnerability in a way which fits to their disciplinary purposes (Fuchs et al. 2011). But why has there been so little progress in our ability to adapt to flood hazards? White et al. (2001) summarised this paradox in an article with the title "Knowing better and losing even more - the use of knowledge in hazard management". One of the fundamental reasons for the lack of progress is the continuing separation of research on natural processes and socio-economic processes without considering interaction between these systems (Fuchs & Keiler 2013), as well as between scientific research results and the policy implementation (Medd & Marvin 2005). Moreover, as many studies were focused on the vulnerability of least developed societies to natural hazards (O'Brien et al. 2008), there is a particular lack in studies targeted at an implementation of existing adaptation frameworks at the level of highly-developed countries (Field et al. 2012; Scolobig et al. 2012). This gap results in a challenge for attempts to develop formal models into practical application and policy

  20. Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan.

    PubMed

    Qureshi, Muhammad Imran; Iftikhar, Mehwish; Bhatti, Mansoor Nazir; Shams, Tauqeer; Zaman, Khalid

    2013-01-01

    In recent years, inventory management is continuous challenge for all organizations not only due to heavy cost associated with inventory holding, but also it has a great deal to do with the organizations production process. Cement industry is a growing sector of Pakistan's economy which is now facing problems in capacity utilization of their plants. This study attempts to identify the key strategies for successful implementation of just-in-time (JIT) management philosophy on the cement industry of Pakistan. The study uses survey responses from four hundred operations' managers of cement industry in order to know about the advantages and benefits that cement industry have experienced by Just in time (JIT) adoption. The results show that implementing the quality, product design, inventory management, supply chain and production plans embodied through the JIT philosophy which infect enhances cement industry competitiveness in Pakistan. JIT implementation increases performance by lower level of inventory, reduced operations & inventory costs was reduced eliminates wastage from the processes and reduced unnecessary production which is a big challenge for the manufacturer who are trying to maintain the continuous flow processes. JIT implementation is a vital manufacturing strategy that reaches capacity utilization and minimizes the rate of defect in continuous flow processes. The study emphasize the need for top management commitment in order to incorporate the necessary changes that need to take place in cement industry so that JIT implementation can take place in an effective manner. PMID:24340248