Science.gov

Sample records for configuration management implementation

  1. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    SciTech Connect

    GARRISON, R.C.

    2000-11-28

    This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

  2. Configuration Management Policy

    EPA Pesticide Factsheets

    This Policy establishes an Agency-wide Configuration Management Program and to provide responsibilities, compliance requirements, and overall principles for Configuration and Change Management processes to support information technology management.

  3. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  4. Software Configuration Management Guidebook

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The growth in cost and importance of software to NASA has caused NASA to address the improvement of software development across the agency. One of the products of this program is a series of guidebooks that define a NASA concept of the assurance processes which are used in software development. The Software Assurance Guidebook, SMAP-GB-A201, issued in September, 1989, provides an overall picture of the concepts and practices of NASA in software assurance. Lower level guidebooks focus on specific activities that fall within the software assurance discipline, and provide more detailed information for the manager and/or practitioner. This is the Software Configuration Management Guidebook which describes software configuration management in a way that is compatible with practices in industry and at NASA Centers. Software configuration management is a key software development process, and is essential for doing software assurance.

  5. Configuration Management Plan for K Basins

    SciTech Connect

    Weir, W.R.; Laney, T.

    1995-01-27

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.

  6. Spent Nuclear Fuel Project Configuration Management Plan

    SciTech Connect

    Reilly, M.A.

    1995-06-09

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  7. Configuration Management at NASA

    NASA Technical Reports Server (NTRS)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  8. Sandia software guidelines, Volume 4: Configuration management

    SciTech Connect

    Not Available

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  9. NCCDS configuration management process improvement

    NASA Technical Reports Server (NTRS)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  10. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  11. Integrating configuration workflows with project management system

    NASA Astrophysics Data System (ADS)

    Nilsen, Dimitri; Weber, Pavel

    2014-06-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  12. Configuration management after design basis reconstitution

    SciTech Connect

    Purcell, J.J. ); Livingston, B.R. )

    1991-01-01

    Over the last few years, Fort Calhoun station (FCS) has implemented a number of programs to enhance plant operability and readiness. The design basis document (DBD) reconstitution project was the cornerstone of this effort. Vendor manual upgrade, operating procedures upgrade, plant equipment data-base verification, equipment labeling, and warehousing improvements were also implemented as part of this improvement program. With the completion of these programs, plant documentation was current to the baselines established by each program, and a configuration management program (CMP) was established to maintain this level of accuracy throughout the remaining life of FCS. Change control throughout the organization has been reviewed and upgraded to ensure that all changes are evaluated for impact to the design bases.

  13. autokonf - A Configuration Script Generator Implemented in Perl

    SciTech Connect

    Reus, J F

    2005-01-12

    This paper discusses configuration scripts in general and the scripting language issues involved. A brief description of GNU autoconf is provided along with a contrasting overview of autokonf, a configuration script generator implemented in Perl, whose macros are implemented in Perl, generating a configuration script in Perl. It is very portable, easily extensible, and readily mastered.

  14. Context based configuration management system

    NASA Technical Reports Server (NTRS)

    Gawdiak, Yuri O. (Inventor); Gurram, Mohana M. (Inventor); Maluf, David A. (Inventor); Mederos, Luis A. (Inventor)

    2010-01-01

    A computer-based system for configuring and displaying information on changes in, and present status of, a collection of events associated with a project. Classes of icons for decision events, configurations and feedback mechanisms, and time lines (sequential and/or simultaneous) for related events are displayed. Metadata for each icon in each class is displayed by choosing and activating the corresponding icon. Access control (viewing, reading, writing, editing, deleting, etc.) is optionally imposed for metadata and other displayed information.

  15. Configuration Data Management (CDM) on a Shoestring Identifying & Utilizing an Existing Configuration & Data Management Infrastructure

    SciTech Connect

    VANN, J.M.

    2000-08-24

    The spreading need for and use of configuration and data management (CDM) standards has highlighted a number of challenges to the companies that need to implement those standards. For companies and organizations that are new to CDM or have limited CDM capabilities, one of the major dilemmas faced is identifying how and where to start. In many cases there is a need to contend with a legacy of poorly identified items and information and an immature or non-existent CDM infrastructure (processes, procedures, people, and information systems). To the company management and CDM professional this poses a seemingly insurmountable task of putting in place a CDM infrastructure that provides the needed benefits while keeping within an acceptable cost and schedule. This paper deals with initially establishing the CDM infrastructure using the tools that a company already has available. The paper identifies features of common software applications that can be used to implement CDM principles.

  16. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  17. Buried waste integrated demonstration configuration management plan

    SciTech Connect

    Cannon, P.G.

    1992-02-01

    This document defines plans for the configuration management requirements for the Buried Waste Integrated Demonstration (BWID) Program. Since BWID is managed programmatically by the Waste Technology Development Department (WTDD), WTDD Program Directive (PD) 1.5 (Document Preparation, Review, Approval, Publication, Management and Change Control) is to be followed for all internal EG&G Idaho, Inc., BWID programmatic documentation. BWID documentation generated by organizations external to EG&G Idaho is not covered by this revision of the Configuration Management Plan (CMP), but will be addressed in subsequent revisions.

  18. Intranet approach to the GTC configuration management

    NASA Astrophysics Data System (ADS)

    Medina, Alvaro

    1998-08-01

    Due to its size and complexity the GTC Project represents a challenge for configuration management. On the one hand there is a need to record and store the enormous amount of configuration documentation generated during the different phases of the project (technical specifications, engineering drawings, interface control documents, acceptance tests, etc.), so that it can be easily accessed on-line by an Project Office member. Moreover, this documentation has to be properly related to the different configuration elements and interfaces composing the GTC's Product Tree. On the other hand, the need arises to simplify all the configuration control procedures established by System Engineering and their associated work flow (document and baseline approval, configuration change requests and evaluation, approval or rejection of those changes, etc.). Intranet technology has proven to be an excellent and innovative tool for satisfying both needs in an integrated manner. This integrated philosophy of the GTC intranet application helps each member of the Project Office fulfill his or her own responsibilities, reduces paper work and minimizes errors. It also assists in locating and accessing any configuration information with a single tool (any standard Internet navigator) regardless of the original format of such information. This paper presents the main features of this intranet application, as well as the intended future extension to other management disciplines (project management, quality management, etc.).

  19. Configuration and Data Management Process and the System Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  20. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  1. Configuration management; Operating power station electrical systems

    SciTech Connect

    Beavers, R.R.; Sumiec, K.F. )

    1989-01-01

    Increasing regulatory and industry attention has been focused on properly controlling electrical design changes. These changes can be controlled by using configuration management techniques. Typically, there are ongoing modifications to various process systems or additions due to new requirements at every power plant. Proper control of these changes requires that an organized method be used to ensure that all important parameters of the electrical auxiliary systems are analyzed and that these parameters are evaluated accurately. This process, commonly referred to as configuration management, is becoming more important on both fossil and nuclear plants. Recent NRC- and utility-initiated inspections have identified problems due to incomplete analysis of changes to electrical auxiliary systems at nuclear stations.

  2. Configuration control of redundant manipulators - Theory and implementation

    NASA Technical Reports Server (NTRS)

    Seraji, Homayoun

    1989-01-01

    A simple approach for controlling the manipulator configuration over the entire motion is presented, based on augmentation of the manipulator forward kinematics. User-defined kinematic functions and the end-effector Cartesian coordinates are combined to form a set of task-related configuration variables as generalized coordinates for the manipulator. A task-based adaptive scheme is then utilized to control the configuration variables and achieve tracking of the desired reference trajectories. This achieves the desired end-effector motion while utilizing redundancy to achieve any additional task. Simulation results for a direct-drive two-link arm are given to illustrate the proposed control scheme. The scheme has also been implemented for real-time control of three links of a PUMA 560 industrial robot. The simulation and experimental results validate the configuration control scheme and demonstrate its capabilities for performing various realistic tasks.

  3. Configuration management plan for the GENII software

    SciTech Connect

    Rittmann, P.D.

    1994-12-12

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user`s input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user`s input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user`s guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan.

  4. Software Configuration Management: A Discipline with Added Value

    DTIC Science & Technology

    2001-07-01

    achieved when practitioners are pro- vided with proper tools, adequate train- ing, and empowered with a quality process.u Note 1. Configuration management ... definition is as defined by the Configuration Management Training Foundation (CMTF), Magalia, Calif. Testing & Configuration Management 8 CROSSTALK

  5. Analysis and moving base simulation of transition configuration management aspects of a powered lift aircraft

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Craig, S. J.; Ashkenas, I. L.

    1973-01-01

    A study aimed at the implementation of a configuration management flight control system is reported. The system is designed to take the guesswork out of, and improve the operational safety of, transition flight in the region from cruise to STOL. Potential improvements in the trim configuration management aspects of the transition process are described.

  6. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    SciTech Connect

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  7. Mac configuration management at the Los Alamos National Laboratory

    SciTech Connect

    Marcus, Allan B

    2010-01-01

    The Los Alamos National Laboratory (LANL) had a need for central configuration management of non-Windows computers. LANL has three to five thousand Macs and an equal number of Linux based systems. The primary goal was to be able to inventory all non-windows systems and patch Mc OS X systems. LANL examined a number of commercial and open source solutions and ultimately selected Puppet. This paper will discuss why we chose Puppet, how we implemented it, and some lessons we learned along the way.

  8. Throughput Benefit Assessment for Tactical Runway Configuration Management (TRCM)

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Fenbert, James W.

    2014-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of needed capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, monitoring the active runway configuration for suitability given existing factors, based on a 90 minute planning horizon. This study evaluates the throughput benefits using a representative sample of today's traffic volumes at three airports: Memphis International Airport (MEM), Dallas-Fort Worth International Airport (DFW), and John F. Kennedy International Airport (JFK). Based on this initial assessment, there are statistical throughput benefits for both arrivals and departures at MEM with an average of 4% for arrivals, and 6% for departures. For DFW, there is a statistical benefit for arrivals with an average of 3%. Although there is an average of 1% benefit observed for departures, it is not statistically significant. For JFK, there is a 12% benefit for arrivals, but a 2% penalty for departures. The results obtained are for current traffic volumes and should show greater benefit for increased future demand. This paper also proposes some potential TRCM algorithm improvements for future research. A continued research plan is being worked to implement these improvements and to re-assess the throughput benefit for today and future projected traffic volumes.

  9. SAPHIRE 8 Software Configuration Management Plan

    SciTech Connect

    Curtis Smith

    2010-01-01

    The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

  10. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 2

    SciTech Connect

    Not Available

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities. This Part 2 includes chapters on implementation guidance for operational configuration management, implementation guidance for design reconstitution, and implementation guidance for material condition and aging management. Appendices are included on design control, examples of design information, conduct of walkdowns, and content of design information summaries.

  11. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    SciTech Connect

    T.L. Larrieu; Y.R. Roblin; K. White; R. Slominski

    2005-10-10

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey & Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a centralized framework.

  12. Configuration Management of an Optimization Application in a Research Environment

    NASA Technical Reports Server (NTRS)

    Townsend, James C.; Salas, Andrea O.; Schuler, M. Patricia

    1999-01-01

    Multidisciplinary design optimization (MDO) research aims to increase interdisciplinary communication and reduce design cycle time by combining system analyses (simulations) with design space search and decision making. The High Performance Computing and Communication Program's current High Speed Civil Transport application, HSCT4.0, at NASA Langley Research Center involves a highly complex analysis process with high-fidelity analyses that are more realistic than previous efforts at the Center. The multidisciplinary processes have been integrated to form a distributed application by using the Java language and Common Object Request Broker Architecture (CORBA) software techniques. HSCT4.0 is a research project in which both the application problem and the implementation strategy have evolved as the MDO and integration issues became better understood. Whereas earlier versions of the application and integrated system were developed with a simple, manual software configuration management (SCM) process, it was evident that this larger project required a more formal SCM procedure. This report briefly describes the HSCT4.0 analysis and its CORBA implementation and then discusses some SCM concepts and their application to this project. In anticipation that SCM will prove beneficial for other large research projects, the report concludes with some lessons learned in overcoming SCM implementation problems for HSCT4.0.

  13. Attaining and maintaining data integrity with configuration management

    NASA Astrophysics Data System (ADS)

    Huffman, Dorothy J.; Jeane, Shirley A.

    1993-08-01

    Managers and scientists are concerned about data integrity because they draw conclusions from data that can have far reaching effects. Projects managers use Configuration Management to insure that hardware, software, and project information are controlled. They have not, as yet, applied its rigorously to data. However, there is ample opportunity in the data collection and production process to jeopardize data integrity. Environmental changes, tampering and production problems can all affect data integrity. There are four functions included in the Configuration Management process: configuration identification, control, auditing and status accounting. These functions provide management the means to attain data integrity and the visibility into engineering processes needed to maintain data integrity. When project managers apply Configuration Management processes to data, the data user can trace back through history to validate data integrity. The user knows that the project allowed only orderly changes to the data. He is assured that project personnel followed procedures to maintain data quality. He also has access to status information about the data. The user receives data products with a known integrity level and a means to assess the impact of past events ont he conclusions derived from the data. To obtain these benefits, project managers should apply the Configuration Management discipline to data.

  14. Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1996-01-01

    The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.

  15. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  16. Search Hanford accessible reports electronically system configuration management plan

    SciTech Connect

    White, E.L.

    1995-01-01

    This Software Configuration Management Plan (SCMP) provides the requirements for control of the Search Hanford Accessible Reports Electronically (SHARE) software and documentation. The SHARE system consists of the TOPIC Text Search and Retrieval software and the programs necessary to extract information from other sources to be placed in SHARE.

  17. Data base management system configuration specification. [computer storage devices

    NASA Technical Reports Server (NTRS)

    Neiers, J. W.

    1979-01-01

    The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

  18. Space Geodesy Project Information and Configuration Management Procedure

    NASA Technical Reports Server (NTRS)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  19. Earth Observing System (EOS)/Advanced Microwave Sounding Unit A (AMSU-A) configuration management plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1994-01-01

    This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.

  20. Implementation of Knowledge Management in Organizations

    ERIC Educational Resources Information Center

    Winkler, Katrin; Mandl, Heinz

    2007-01-01

    In the context of learning implementation of new ideas e.g. knowledge management in organizations often is neglected. Concerning knowledge management measures we demonstrate its implementation in organizations. A theoretical framework was developed showing the necessary basic conditions for implementing knowledge management. Subsequently we…

  1. The Network Configuration of an Object Relational Database Management System

    NASA Technical Reports Server (NTRS)

    Diaz, Philip; Harris, W. C.

    2000-01-01

    The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.

  2. Supporting performance and configuration management of GTE cellular networks

    SciTech Connect

    Tan, Ming; Lafond, C.; Jakobson, G.; Young, G.

    1996-12-31

    GTE Laboratories, in cooperation with GTE Mobilnet, has developed and deployed PERFFEX (PERFormance Expert), an intelligent system for performance and configuration management of cellular networks. PERFEX assists cellular network performance and radio engineers in the analysis of large volumes of cellular network performance and configuration data. It helps them locate and determine the probable causes of performance problems, and provides intelligent suggestions about how to correct them. The system combines an expert cellular network performance tuning capability with a map-based graphical user interface, data visualization programs, and a set of special cellular engineering tools. PERFEX is in daily use at more than 25 GTE Mobile Switching Centers. Since the first deployment of the system in late 1993, PERFEX has become a major GTE cellular network performance optimization tool.

  3. Benefits Assessment for Tactical Runway Configuration Management Tool

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamongkolkij, Nipa; Lohr, Gary; Fenbert, James W.

    2013-01-01

    The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

  4. Windows Calorimeter Control (WinCal) program computer software configuration management plan

    SciTech Connect

    1997-03-26

    This document describes the system configuration management activities performed in support of the Windows Calorimeter Control (WinCal) system, in accordance with Site procedures based on Institute of Electrical and Electronic Engineers (IEEE) Standard 828-1990, Standard for Software Configuration Management Plans (IEEE 1990) and IEEE Standard 1042-1987, Guide to Software Configuration Management (IEEE 1987).

  5. The Use of Innovation Configuration Maps in Assessing Implementation: The Bridge between Development and Student Outcomes.

    ERIC Educational Resources Information Center

    Hall, Gene E.; George, Archie A.

    This paper describes Innovation Configuration (IC) Mapping as an approach for assessing the extent of implementation of a program. An IC Map is similar metaphorically to a road map in that it summarizes different ways of getting from one point to another. Each map consists of basic units, or components, that can be made operational in a number of…

  6. Smart Management in Effective Schools: Effective Management Configurations in General and Vocational Education in the Netherlands

    ERIC Educational Resources Information Center

    Hofman, W. H. Adriaan; Hofman, Roelande H.

    2011-01-01

    Purpose: In this study the authors focus on different (configurations of) leadership or management styles in schools for general and vocational education. Findings: Using multilevel (students and schools) analyses, strong differences in effective management styles between schools with different student populations were observed. Conclusions: The…

  7. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    A NATURAL RESOURCES RESEARCH PROGRAM US Amy CrpsMISCELLANEOUS PAPER R-89-2 ofEgier OPERATIONAL MANAGEMENT PLANS: STATUS, CONTENT , AND IMPLEMENTATION...NO NO. CCESSIONNO/ 32503 11. TITLE (incude Security Cla m karion) Operational Management Plans: Status, Content , and Implementation 12. PERSONAL...reverse if necessaty and identify by block number) - This report presents the current status, content , and implecrntation of Operational Management Plans

  8. Heat flux management via advanced magnetic divertor configurations and divertor detachment

    NASA Astrophysics Data System (ADS)

    Kolemen, E.; Allen, S. L.; Bray, B. D.; Fenstermacher, M. E.; Humphreys, D. A.; Hyatt, A. W.; Lasnier, C. J.; Leonard, A. W.; Makowski, M. A.; McLean, A. G.; Maingi, R.; Nazikian, R.; Petrie, T. W.; Soukhanovskii, V. A.; Unterberg, E. A.

    2015-08-01

    The snowflake divertor (SFD) control and detachment control to manage the heat flux at the divertor are successfully demonstrated at DIII-D. Results of the development and implementation of these two heat flux reduction control methods are presented. The SFD control algorithm calculates the position of the two null-points in real-time and controls shaping coil currents to achieve and stabilize various snowflake configurations. Detachment control stabilizes the detachment front fixed at specified distance between the strike point and the X-point throughout the shot.

  9. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  10. Ground Systems Development Environment (GSDE) software configuration management

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.

  11. Total Quality Management (TQM). Implementers Workshop

    DTIC Science & Technology

    1990-05-15

    approaches and methods for planning, organizing, and launching TOM within OSD functions. 1-3 . .. TOTAL QUALITY I Ii N MANAGEMENT Implementers Workshop...TOM Review COMMON THEMES OF TQM EXPERTS - Customer defines quality . - Quality becomes prevention-based. - Team approach to problem-solving...different in approaches , all advocate the quality path to productivity. 2-5 a gg. Z - TOTAL QUALITY J LI VI MANAGEMENT Implementers Workshop TQM Review

  12. Total quality management implementation guidelines

    SciTech Connect

    Not Available

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  13. Implementing HIPAA: a manager's blueprint.

    PubMed

    Entin, A

    2001-12-01

    The Health Insurance Portability and Accountability Act of 1996 will prove to be one of the most far-reaching health care reform laws of our generation. Virtually every sector of health care will need to reengineer its systems to protect its patient information infrastructure, and combat waste and abuse. The benefits will justify the efforts and costs if the result is a system in which patient medical information is protected, and information will begin to flow between payers and providers in a seamless, standardized and secure fashion. This article studies various strategies and approaches that management may use to maximize compliance efforts.

  14. An open and configurable embedded system for EMG pattern recognition implementation for artificial arms.

    PubMed

    Jun Liu; Fan Zhang; Huang, He Helen

    2014-01-01

    Pattern recognition (PR) based on electromyographic (EMG) signals has been developed for multifunctional artificial arms for decades. However, assessment of EMG PR control for daily prosthesis use is still limited. One of the major barriers is the lack of a portable and configurable embedded system to implement the EMG PR control. This paper aimed to design an open and configurable embedded system for EMG PR implementation so that researchers can easily modify and optimize the control algorithms upon our designed platform and test the EMG PR control outside of the lab environments. The open platform was built on an open source embedded Linux Operating System running a high-performance Gumstix board. Both the hardware and software system framework were openly designed. The system was highly flexible in terms of number of inputs/outputs and calibration interfaces used. Such flexibility enabled easy integration of our embedded system with different types of commercialized or prototypic artificial arms. Thus far, our system was portable for take-home use. Additionally, compared with previously reported embedded systems for EMG PR implementation, our system demonstrated improved processing efficiency and high system precision. Our long-term goals are (1) to develop a wearable and practical EMG PR-based control for multifunctional artificial arms, and (2) to quantify the benefits of EMG PR-based control over conventional myoelectric prosthesis control in a home setting.

  15. 78 FR 47014 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... COMMISSION Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear... 1 of RG 1.169, ``Configuration Management Plans for Digital Computer Software Used in Safety Systems... those systems include software. This RG is one of six RG revisions addressing computer...

  16. 77 FR 50727 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... COMMISSION Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear... draft regulatory guide (DG), DG-1206, ``Configuration Management Plan for Digital Computer Software Used... Digital Computer Software Used in Safety Systems of Nuclear Power Plants'' is temporarily identified...

  17. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... 49 Transportation 4 2010-10-01 2010-10-01 false Design, interoperability, and configuration management requirements. 232.603 Section 232.603 Transportation Other Regulations Relating to...

  18. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... 49 Transportation 4 2013-10-01 2013-10-01 false Design, interoperability, and configuration management requirements. 232.603 Section 232.603 Transportation Other Regulations Relating to...

  19. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... 49 Transportation 4 2014-10-01 2014-10-01 false Design, interoperability, and configuration management requirements. 232.603 Section 232.603 Transportation Other Regulations Relating to...

  20. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... 49 Transportation 4 2012-10-01 2012-10-01 false Design, interoperability, and configuration management requirements. 232.603 Section 232.603 Transportation Other Regulations Relating to...

  1. 49 CFR 232.603 - Design, interoperability, and configuration management requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Pneumatic (ECP) Braking Systems § 232.603 Design, interoperability, and configuration management... 49 Transportation 4 2011-10-01 2011-10-01 false Design, interoperability, and configuration management requirements. 232.603 Section 232.603 Transportation Other Regulations Relating to...

  2. Development and implementation of a PACS network and resource manager

    NASA Astrophysics Data System (ADS)

    Stewart, Brent K.; Taira, Ricky K.; Dwyer, Samuel J., III; Huang, H. K.

    1992-07-01

    Clinical acceptance of PACS is predicated upon maximum uptime. Upon component failure, detection, diagnosis, reconfiguration and repair must occur immediately. Our current PACS network is large, heterogeneous, complex and wide-spread geographically. The overwhelming number of network devices, computers and software processes involved in a departmental or inter-institutional PACS makes development of tools for network and resource management critical. The authors have developed and implemented a comprehensive solution (PACS Network-Resource Manager) using the OSI Network Management Framework with network element agents that respond to queries and commands for network management stations. Managed resources include: communication protocol layers for Ethernet, FDDI and UltraNet; network devices; computer and operating system resources; and application, database and network services. The Network-Resource Manager is currently being used for warning, fault, security violation and configuration modification event notification. Analysis, automation and control applications have been added so that PACS resources can be dynamically reconfigured and so that users are notified when active involvement is required. Custom data and error logging have been implemented that allow statistics for each PACS subsystem to be charted for performance data. The Network-Resource Manager allows our departmental PACS system to be monitored continuously and thoroughly, with a minimal amount of personal involvement and time.

  3. Network configuration management : paving the way to network agility.

    SciTech Connect

    Maestas, Joseph H.

    2007-08-01

    Sandia networks consist of nearly nine hundred routers and switches and nearly one million lines of command code, and each line ideally contributes to the capabilities of the network to convey information from one location to another. Sandia's Cyber Infrastructure Development and Deployment organizations recognize that it is therefore essential to standardize network configurations and enforce conformance to industry best business practices and documented internal configuration standards to provide a network that is agile, adaptable, and highly available. This is especially important in times of constrained budgets as members of the workforce are called upon to improve efficiency, effectiveness, and customer focus. Best business practices recommend using the standardized configurations in the enforcement process so that when root cause analysis results in recommended configuration changes, subsequent configuration auditing will improve compliance to the standard. Ultimately, this minimizes mean time to repair, maintains the network security posture, improves network availability, and enables efficient transition to new technologies. Network standardization brings improved network agility, which in turn enables enterprise agility, because the network touches all facets of corporate business. Improved network agility improves the business enterprise as a whole.

  4. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    SciTech Connect

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

  5. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  6. Implementing a Microcomputer Database Management System.

    ERIC Educational Resources Information Center

    Manock, John J.; Crater, K. Lynne

    1985-01-01

    Current issues in selecting, structuring, and implementing microcomputer database management systems in research administration offices are discussed, and their capabilities are illustrated with the system used by the University of North Carolina at Wilmington. Trends in microcomputer technology and their likely impact on research administration…

  7. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  8. Implementation of a Computerized Maintenance Management System

    NASA Technical Reports Server (NTRS)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  9. Now's the Time: Implementing Performance Management

    ERIC Educational Resources Information Center

    Legutko, Lee V.

    2012-01-01

    During the past several years, school systems have implemented a variety of organizational improvement initiatives, such as Six Sigma, Balanced Scorecards, Baldrige Criteria, activity-based costing, and managing for results. Unfortunately, evidence of sustained success is fleeting as school districts remain trapped in a time warp of command,…

  10. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  11. Synthesizing Configurable Biochemical Implementation of Linear Systems from Their Transfer Function Specifications

    PubMed Central

    Chiu, Tai-Yin; Chiang, Hui-Ju K.; Huang, Ruei-Yang; Jiang, Jie-Hong R.; Fages, François

    2015-01-01

    The ability to engineer synthetic systems in the biochemical context is constantly being improved and has a profound societal impact. Linear system design is one of the most pervasive methods applied in control tasks, and its biochemical realization has been proposed by Oishi and Klavins and advanced further in recent years. However, several technical issues remain unsolved. Specifically, the design process is not fully automated from specification at the transfer function level, systems once designed often lack dynamic adaptivity to environmental changes, matching rate constants of reactions is not always possible, and implementation may be approximative and greatly deviate from the specifications. Building upon the work of Oishi and Klavins, this paper overcomes these issues by introducing a design flow that transforms a transfer-function specification of a linear system into a set of chemical reactions, whose input-output response precisely conforms to the specification. This system is implementable using the DNA strand displacement technique. The underlying configurability is embedded into primitive components and template modules, and thus the entire system is adaptive. Simulation of DNA strand displacement implementation confirmed the feasibility and superiority of the proposed synthesis flow. PMID:26352855

  12. Demand management implementation in Southeast Asia

    SciTech Connect

    Tanaboriboon, Y.

    1995-12-31

    The need to apply transportation system management, to developing countries is urgent. Attempts to alleviate severe traffic congestion in their metropolises have so far failed to provide adequate solutions. The countries are faced with many difficulties because of the lack of sufficient financial resources together with their complex internal administrative and political problems. They are incapable of providing sufficient road space to cope with the escalating demand in private automobiles. This has led to excessive delays in urban traveling, environmental pollution problems, decline of road-based public transit services and deterioration of the quality of life in these metropolises. Demand management, in use for decades in the Western world, has also been recognized in Singapore`s famous area licensing scheme (ALS) making other Southeast Asian Metropolises aware of its advantages as an alternative in solving their chaotic traffic problems. However, realization is far different from implementation and still many metropolises are not able to apply the technique. Singapore and Thailand, two leaders among many other Southeast Asian regions in economics, tourism, trade and industry handle their problems far differently, especially the traffic congestion problem. While a number of demand management schemes have been implemented successfully in Singapore since 1975, Bangkok is still struggling to implement such measures to alleviate severe traffic congestion problems. This article intends to high light the successful practices and unsuccessful attempts of demand management techniques applied in Singapore and Bangkok.

  13. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  14. An Air Force Guide to Computer Program Configuration Management

    DTIC Science & Technology

    1977-08-01

    the specific requirements set forth for hardware do not appl ’, to CPCIs, but that computer program contractors should implement procedurts to comply...DATE PAGE NO. IDITIFIER ISSUE DATE IDfTFE IDENTII Computor Progrom SPECIFICATION CHANGE NOTICE OATI: PRFPAnlo - I ORIGINATOR NAME AND AORECSS 2, LS

  15. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    SciTech Connect

    FROEHLICH,GARY K.; WILLIAMSON,CHARLES MICHAEL; OGDEN,HARVEY C.

    2000-05-23

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 Gigabytes, was accomplished in 5 months by 2 individuals, with full traceability and reproducibility.

  16. Flight test configuration for verifying inertial sensor redundancy management techniques

    NASA Technical Reports Server (NTRS)

    Bryant, W. H.; Morrell, F. R.; Bailey, M. L.

    1984-01-01

    The Redundant Strapdown Inertial Measurement Unit presently tested in flight configuration consists of a semioctahedral array of four dynamically tuned, two-degree-of-freedom (TDOF) gyros and four TDOF accelerometers which can provide dual, fail-operational performance for integrated avionics systems. Attention is given to the multilevel algorithm used for the detection and isolation of three ranges of sensor failure in an integrated avionics context. A technique for the generation of accelerometer and gyro error thresholds which is sensitive to dynamic sensor errors and separation effects is presented, together with simulation results. Emphasis is placed on the ensuring of highly reliable data for flight control/navigation functions, while minimizing false or missed alarms.

  17. FPGA implementation of a configurable neuromorphic CPG-based locomotion controller.

    PubMed

    Barron-Zambrano, Jose Hugo; Torres-Huitzil, Cesar

    2013-09-01

    Neuromorphic engineering is a discipline devoted to the design and development of computational hardware that mimics the characteristics and capabilities of neuro-biological systems. In recent years, neuromorphic hardware systems have been implemented using a hybrid approach incorporating digital hardware so as to provide flexibility and scalability at the cost of power efficiency and some biological realism. This paper proposes an FPGA-based neuromorphic-like embedded system on a chip to generate locomotion patterns of periodic rhythmic movements inspired by Central Pattern Generators (CPGs). The proposed implementation follows a top-down approach where modularity and hierarchy are two desirable features. The locomotion controller is based on CPG models to produce rhythmic locomotion patterns or gaits for legged robots such as quadrupeds and hexapods. The architecture is configurable and scalable for robots with either different morphologies or different degrees of freedom (DOFs). Experiments performed on a real robot are presented and discussed. The obtained results demonstrate that the CPG-based controller provides the necessary flexibility to generate different rhythmic patterns at run-time suitable for adaptable locomotion.

  18. Current Practices in Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB)

    NASA Technical Reports Server (NTRS)

    Lohr, Gary W.; Williams, Daniel M.

    2008-01-01

    Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.

  19. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  20. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    SciTech Connect

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  1. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  2. Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)

    SciTech Connect

    WHITE, K.A.

    2000-11-28

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309, Rev. 1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  3. Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan

    SciTech Connect

    KOCH, M.R.

    1999-11-16

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309, Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

  4. New implementation of the configuration-based multi-reference second order perturbation theory

    NASA Astrophysics Data System (ADS)

    Lei, Yibo; Wang, Yubin; Han, Huixian; Song, Qi; Suo, Bingbing; Wen, Zhenyi

    2012-10-01

    We present an improved version of the configuration-based multi-reference second-order perturbation approach (CB-MRPT2) according to the formulation of Lindgren on perturbation theory of a degenerate model space. This version involves a reclassification of the perturbation functions and new algorithms to calculate matrix elements in the perturber energy expressions utilizing the graphical unitary group approach and the hole-particle symmetry. The diagonalize-then-perturb (DP), including Rayleigh-Schrödinger and Brillouin-Wigner, and diagonalize-then-perturb-then-diagonalize (DPD) modes have been implemented. The new CB-MRPT2 method is applied to several typical and interesting systems: (1) the vertical excitation energies for several states of CO and N2, (2) energy comparison and timing of the ground state of C4H6, (3) the quasi-degeneracy of states in LiF, (4) the intruder state problems of AgH, and (5) the relative energies of di-copper-oxygen-ammonia complex isomers. The results indicate that the computational accuracy and efficiency of the presented methods are competitive and intruder-free. It should be emphasized that the DPD method rectifies naturally the shortcomings of LiF potential energy curves constructed by the original second order complete active space perturbation theory (CASPT2), without having to recourse to the so-called state mixture. Unlike CASPT2, the new methods give the same energy ordering for the two di-copper-oxygen-ammonia isomers as the previous multi-reference configuration interaction with single and double excitations methods. The new CB-MRPT2 method is shown to be a useful tool to study small to medium-sized systems.

  5. BGP-Based Routing Configuration Management for Multidomain Mobile Networks

    DTIC Science & Technology

    2010-09-01

    routers, mostly by hand, knowing peering associations. It is because the BGP uses the TCP protocol in order to reliably carry the routing messages...SSH session [16]. In the second case, when the systems have been already connected via another link, the managers already know the parameters of...thesis, supervisor: J. Krygier, MUT , Warsaw 2010, [14] RFC 2461: Neighbor Discovery for IP Version 6 (IPv6), 1998 [15] RFC 2710: Multicast Listener

  6. Evaluation of Early Ground Control Station Configurations for Interacting with a UAS Traffic Management (UTM) System

    NASA Technical Reports Server (NTRS)

    Dao, Arik-Quang V.; Martin, Lynne; Mohlenbrink, Christoph; Bienert, Nancy; Wolte, Cynthia; Gomez, Ashley; Claudatos, Lauren; Mercer, Joey

    2017-01-01

    The purpose of this paper is to report on a human factors evaluation of ground control station design concepts for interacting with an unmanned traffic management system. The data collected for this paper comes from recent field tests for NASA's Unmanned Traffic Management (UTM) project, and covers the following topics; workload, situation awareness, as well as flight crew communication, coordination, and procedures. The goal of this evaluation was to determine if the various software implementations for interacting with the UTM system can be described and classified into design concepts to provide guidance for the development of future UTM interfaces. We begin with a brief description of NASA's UTM project, followed by a description of the test range configuration related to a second development phase. We identified (post hoc) two classes in which the ground control stations could be grouped. This grouping was based on level of display integration. The analysis was exploratory and informal. It was conducted to compare ground stations across those two classes and against the aforementioned topics. Herein, we discuss the results.

  7. Heart failure disease management: implementation and outcomes.

    PubMed

    Whellan, David J

    2005-01-01

    Millions of dollars are being spent to identify new therapies to improve mortality and morbidity for the growing epidemic of patients sustaining heart failure. However, in clinical practice, these therapies are currently underused. To bridge the gap between proven therapies and clinical practice, the medical community has turned to disease management. Heart failure disease management interventions vary from vital-sign monitoring to multidisciplinary approaches involving a pharmacist, nutritionist, nurse practitioner, and physician. This review attempts to categorize these inventions based on location. We compared the published results from randomized, controlled trials of the following types of heart failure disease management interventions: inpatient, clinic visits, home visits, and telephone follow up. Although research shows an improvement in the quality of care and a decrease in hospitalizations for patients sustaining heart failure, the economic impact of disease management is still unclear. The current reimbursement structure is a disincentive to providers wanting to offer disease management services to patients sustaining heart failure. Additionally, the cost of providing disease management services such as additional clinical visits, patient education materials, or additional personnel time has not been well documented. Most heart failure disease management studies do confirm the concept that providing increased access to healthcare providers for an at-risk group of patients sustaining heart failure does improve outcomes. However, a large-scale randomized, controlled clinical trial based in the United States is needed to prove that this concept can be implemented beyond a single center and to determine how much it will cost patients, providers, healthcare systems, and payers.

  8. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  9. F-16 Implementation and Management. Plan Report.

    DTIC Science & Technology

    1981-03-01

    JXPK1R - .EELOPMENT RER6-.Jio. 18 ,v MARCH, -1" Prepared in fulfillment of CDRL nos. B028, B029, B030, B033, B050, B057, B059 II LECTEI by S JUNO 8...implementation and management plan report (F-16 Development Report No. 18 ). San Diego, Calif.: Courseware, Inc., October 1978, March 1981. Sudweeks...Instruction .............. 17 v . E . CONTENTS (Cont.) Page 3.4 Student Training and Measurement ......... 18 3.4.1 Academic events .............. 18 3.4.2

  10. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Control Room Management... of Pipeline Safety Representatives (NAPSR) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued...

  11. Implementation of remote monitoring and managing switches

    NASA Astrophysics Data System (ADS)

    Leng, Junmin; Fu, Guo

    2010-12-01

    In order to strengthen the safety performance of the network and provide the big convenience and efficiency for the operator and the manager, the system of remote monitoring and managing switches has been designed and achieved using the advanced network technology and present network resources. The fast speed Internet Protocol Cameras (FS IP Camera) is selected, which has 32-bit RSIC embedded processor and can support a number of protocols. An Optimal image compress algorithm Motion-JPEG is adopted so that high resolution images can be transmitted by narrow network bandwidth. The architecture of the whole monitoring and managing system is designed and implemented according to the current infrastructure of the network and switches. The control and administrative software is projected. The dynamical webpage Java Server Pages (JSP) development platform is utilized in the system. SQL (Structured Query Language) Server database is applied to save and access images information, network messages and users' data. The reliability and security of the system is further strengthened by the access control. The software in the system is made to be cross-platform so that multiple operating systems (UNIX, Linux and Windows operating systems) are supported. The application of the system can greatly reduce manpower cost, and can quickly find and solve problems.

  12. Uncovering middle managers' role in healthcare innovation implementation

    PubMed Central

    2012-01-01

    Background Middle managers have received little attention in extant health services research, yet they may have a key role in healthcare innovation implementation. The gap between evidence of effective care and practice may be attributed in part to poor healthcare innovation implementation. Investigating middle managers' role in healthcare innovation implementation may reveal an opportunity for improvement. In this paper, we present a theory of middle managers' role in healthcare innovation implementation to fill the gap in the literature and to stimulate research that empirically examines middle managers' influence on innovation implementation in healthcare organizations. Discussion Extant healthcare innovation implementation research has primarily focused on the roles of physicians and top managers. Largely overlooked is the role of middle managers. We suggest that middle managers influence healthcare innovation implementation by diffusing information, synthesizing information, mediating between strategy and day-to-day activities, and selling innovation implementation. Summary Teamwork designs have become popular in healthcare organizations. Because middle managers oversee these team initiatives, their potential to influence innovation implementation has grown. Future research should investigate middle managers' role in healthcare innovation implementation. Findings may aid top managers in leveraging middle managers' influence to improve the effectiveness of healthcare innovation implementation. PMID:22472001

  13. Benefit Assessment for Metroplex Tactical Runway Configuration Management (mTRCM) in a Simulated Environment

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Robbins, Steven W.; Fenbert, James W.; Hartman, Christopher L.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, and monitoring the active runway configuration for suitability given existing factors. This report focuses on the metroplex environment, with two or more proximate airports having arrival and departure operations that are highly interdependent. The myriad of factors that affect metroplex opeations require consideration in arriving at runway configurations that collectively best serve the system as a whole. To assess the metroplex TRCM (mTRCM) benefit, the performance metrics must be compared with the actual historical operations. The historical configuration schedules can be viewed as the schedules produced by subject matter experts (SMEs), and therefore are referred to as the SMEs' schedules. These schedules were obtained from the FAA's Aviation System Performance Metrics (ASPM) database; this is the most representative information regarding runway configuration selection by SMEs. This report focused on a benefit assessment of total delay, transit time, and throughput efficiency (TE) benefits using the mTRCM algorithm at representative volumes for today's traffic at the New York metroplex (N90).

  14. Oak Ridge National Laboratory's (ORNL) Weigh-In-Motion (WIM) Configuration and Data Management Activities

    SciTech Connect

    Abercrombie, Robert K; Sheldon, Frederick T; Schlicher, Bob G

    2006-01-01

    The Oak Ridge National Laboratory (ORNL) involvement in the Weigh-in-Motion (WIM) research with both government agencies and private companies dates back to 1989. The discussion here will focus on the US Army's current need for an automated WIM system to weigh and determine the center-of-balance for military wheeled vehicles and cargo and the expanded uses of WIM data. ORNL is addressing configuration and data management issues as they relate to deployments for both military and humanitarian activities. The transition from the previous WIM Gen I to the current Gen II system illustrates a configuration and data management solution that ensures data integration, integrity, coherence and cost effectiveness. Currently, Army units use portable and fixed scales, tape measures, and calculators to determine vehicle axle, total weights and center of balance for vehicles prior to being transshipped via railcar, ship, or airlifted. Manually weighing and measuring all vehicles subject to these transshipment operations is time-consuming, labor-intensive, hazardous and is prone to human errors (e.g., misreading scales and tape measures, calculating centers of balance and wheel, axle, and vehicle weights, recording data, and transferring data from manually prepared work sheets into an electronic data base and aggravated by adverse weather conditions). Additionally, in the context of the military, the timeliness, safety, success, and effectiveness of airborne heavy-drop operations can be significantly improved by the use of an automated system to weigh and determine center of balance of vehicles while they are in motion. The lack of a standardized airlift-weighing system for joint service use also creates redundant weighing requirements at the cost of scarce resources and time. This case study can be judiciously expanded into commercial operations related to safety and enforcement. The WIM program will provide a means for the Army to automatically identify/weigh and monitor

  15. Implementation of a human milk management center.

    PubMed

    Spatz, Diane L; Schmidt, Katherine J; Kinzler, Sue

    2014-08-01

    Current hospital practices surrounding the use of human milk and fortification are suboptimal. Safety of milk preparation should be a priority, as should optimization of the milk to meet the nutritional needs of hospitalized infants. This article describes the implementation of a human milk management center (HMMC) at a children's hospital. This centralized center allows for milk to be safely prepared under aseptic technique. In addition, the HMMC staff can analyze milk composition. The widely variable nutrient composition of human milk has been well established and, therefore, should be considered when fortifying human milk. The HMMC staff have the ability to perform creamatocrits on milk, conduct human milk nutrient analysis, and make skim milk for infants. The processes for developing an HMMC are also detailed in this article.

  16. An advanced configuration management system for full scope power plant simulators

    SciTech Connect

    Storm, J.; Goemann, A.

    1996-11-01

    In August 1993 KSG Kraftwerks-Simulator-Gesellschaft, Germany, awarded a contract to STN ATLAS Elektronik for the delivery of two full scope replica training simulators for the German BWR plants Isar 1 and Philipsburg 1, known as the double simulator project S30 (S31/S32). For both projects a computer based Configuration Management System (CMS) was required to overcome deficiencies of older simulator systems in terms of limited upgrade and maintenance capabilities and incomplete documentation. The CMS allows complete control over the entire simulator system covering all software- and hardware-items and therewith exceed quality assurance requirements as defined in ISO 9000-3 which gives recommendations for software configuration management only. The system is realized under the project using the UNIX based relational database system EMPRESS and is in use as a development- and maintenance-tool to improve simulator quality and ensure simulator configuration integrity.

  17. Implementing disease management in community pharmacy practice.

    PubMed

    Holdford, D; Kennedy, D T; Bernadella, P; Small, R E

    1998-01-01

    Disease management (DM) is a comprehensive approach to preventing and treating disease that: (1) targets patients with specific diseases; (2) provides integrated services across organizational and professional boundaries; (3) utilizes services based on the best scientific evidence available; and (4) focuses on outcomes. DM differs from pharmaceutical care in that pharmaceutical care targets not only patients with specific diseases but also those with risk factors for drug-related problems, a history of nonadherence, and frequent changes in medication regimens. Steps to starting a DM program include: (1) identifying a target population based on the population's strategic importance to the goals and aims of the organization; (2) assessing the organization's available resources, both internal and external; (3) defining key indicators with which to assess the program for the purposes of internal quality control and of obtaining compensation from third-party payers; (4) implementing the program using the best scientific methods available; and (5) assessing the impact of the program. The development of a smoking cessation program at a nationwide retail pharmacy chain is used as an example of a DM program initiated in community pharmacy practice. Pharmacists are well positioned to take a major role in DM, because they are accessible to the community and because DM frequently involves drug therapy. DM is also widely used in managed care. It is important that community pharmacists be closely involved in the DM approach as it evolves.

  18. Successful implementation and use of a learning management system.

    PubMed

    Davis, Renee; Surajballi, Vaneeta

    2014-09-01

    The evolving world of technology has impacted nursing education in various ways. Implementing a learning management system provides a dynamic approach to traditional teaching methods. The key to successful implementation is communication. This article expands on the implementation process of a learning management system and the processes that were significantly improved due to this technology.

  19. Implementing CORAL: An Electronic Resource Management System

    ERIC Educational Resources Information Center

    Whitfield, Sharon

    2011-01-01

    A 2010 electronic resource management survey conducted by Maria Collins of North Carolina State University and Jill E. Grogg of University of Alabama Libraries found that the top six electronic resources management priorities included workflow management, communications management, license management, statistics management, administrative…

  20. DoD Supply Chain Management Implementation Guide

    DTIC Science & Technology

    2000-12-01

    The DoD Supply Chain Management Implementation Guide is a tool to assist logistics personnel who are responsible for implementing supply chain management...This Guide presents the key supply chain principles and implementation strategies compiled into a structured and workable approach for achieving...progress toward fully incorporating supply chain management into the DoD logistics process. This document is Intended to serve as a roadmap for

  1. PTC MathCAD and Workgroup Manager: Implementation in a Multi-Org System

    NASA Technical Reports Server (NTRS)

    Jones, Corey

    2015-01-01

    In this presentation, the presenter will review what was done at Kennedy Space Center to deploy and implement PTC MathCAD and PTC Workgroup Manager in a multi-org system. During the presentation the presenter will explain how they configured PTC Windchill to create custom soft-types and object initialization rules for their custom numbering scheme and why they choose these methods. This presentation will also include how to modify the EPM default soft-type file in the PTC Windchill server codebase folder. The presenter will also go over the code used in a start up script to initiate PTC MathCAD and PTC Workgroup Manager in the proper order, and also set up the environment variables when running both PTC Workgroup Manager and PTC Creo. The configuration.ini file the presenter used will also be reviewed to show you how to set up the PTC Workgroup Manager and customized it to their user community. This presentation will be of interest to administrators trying to create a similar set-up in either a single org or multiple org system deployment. The big take away will be ideas and best practices learned through implementing this system, and the lessons learned what to do and not to do when setting up this configuration. Attendees will be exposed to several different sets of code used and that worked well and will hear some limitations on what the software can accomplish when configured this way.

  2. Implementation of Total Asset Management at the University of Tasmania.

    ERIC Educational Resources Information Center

    Smith, Matt

    2002-01-01

    Describes the implementation of total asset management (TAM) at the University of Tasmania to better link physical resources management with the university's strategic planning. Discusses TAM's principles, objectives, and future direction. (EV)

  3. Implementing Response to Intervention: Use of Innovation Configuration Maps within a Multiple-Case Study Analysis

    ERIC Educational Resources Information Center

    Fernando, Sheara

    2010-01-01

    The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…

  4. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    SciTech Connect

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  5. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  6. Design of a flight director/configuration management system for piloted STOL approaches

    NASA Technical Reports Server (NTRS)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1973-01-01

    The design and characteristics of a flight director for V/STOL aircraft are discussed. A configuration management system for piloted STOL approaches is described. The individual components of the overall system designed to reduce pilot workload to an acceptable level during curved, decelerating, and descending STOL approaches are defined. The application of the system to augmentor wing aircraft is analyzed. System performance checks and piloted evaluations were conducted on a flight simulator and the results are summarized.

  7. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    SciTech Connect

    Graf, F.A. Jr.

    1995-02-27

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System`s pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System.

  8. Managing Hardware Configurations and Data Products for the Canadian Hydrogen Intensity Mapping Experiment

    NASA Astrophysics Data System (ADS)

    Hincks, A. D.; Shaw, J. R.; Chime Collaboration

    2015-09-01

    The Canadian Hydrogen Intensity Mapping Experiment (CHIME) is an ambitious new radio telescope project for measuring cosmic expansion and investigating dark energy. Keeping good records of both physical configuration of its 1280 antennas and their analogue signal chains as well as the ˜100 TB of data produced daily from its correlator will be essential to the success of CHIME. In these proceedings we describe the database-driven software we have developed to manage this complexity.

  9. Implementation of New Public Management in Norwegian Universities

    ERIC Educational Resources Information Center

    Frolich, Nicoline

    2005-01-01

    This article analyses the implementation of market-type mechanisms in the management of universities. The question of which cultural biases have been used in the implementation of New Public Management (NPM) in Norwegian universities is discussed. Cultural theory, institutional theory, and public policy studies are applied to the analysis of a…

  10. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  11. Configuration Management (CM) Support for KM Processes at NASA/Johnson Space Center (JSC)

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2010-01-01

    Collection and processing of information are critical aspects of every business activity from raw data to information to an executable decision. Configuration Management (CM) supports KM practices through its automated business practices and its integrated operations within the organization. This presentation delivers an overview of JSC/Space Life Sciences Directorate (SLSD) and its methods to encourage innovation through collaboration and participation. Specifically, this presentation will illustrate how SLSD CM creates an embedded KM activity with an established IT platform to control and update baselines, requirements, documents, schedules, budgets, while tracking changes essentially managing critical knowledge elements.

  12. INCEPTION, DESIGN AND IMPLEMENTATION OF A MANAGEMENT INFORMATION SYSTEM.

    DTIC Science & Technology

    The purpose of this paper is to develop a uniform systematic approach to the design and implementation of a management information system . In recent...directed towards the design of a management information system . To this end - the creaction of such a document - is this paper dedicated. The...inception to successful implementation of a management information system . Many factors must be considered while applying this procedure, e.g., complexity

  13. Configuration Control of a Mobile Dextrous Robot: Real-Time Implementation and Experimentation

    NASA Technical Reports Server (NTRS)

    Lim, David; Seraji, Homayoun

    1996-01-01

    This paper describes the design and implementation of a real-time control system with multiple modes of operation for a mobile dexterous manipulator. The manipulator under study is a kinematically redundant seven degree-of-freedom arm from Robotics Research Corporation, mounted on a one degree-of-freedom motorized platform.

  14. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    SciTech Connect

    Laney, T.

    1994-08-30

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.

  15. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  16. Configuration management and monitoring of the middleware at GridKa

    NASA Astrophysics Data System (ADS)

    Nilsen, Dimitri; Weber, Pavel

    2012-12-01

    GridKa is a computing centre located in Karlsruhe. It serves as Tier-1 centre for the four LHC experiments and also provides its computing and storage resources for other non-LHC HEP and astroparticle physics experiments as well as for several communities of the German Grid Initiative D-Grid. The middleware layer at GridKa comprises three main flavours: Globus, gLite and UNICORE. This layer provides the access to the several clusters, according to the requirements of the corresponding communities. The heterogeneous structure of middleware resources and services requires their effective administration for stable and sustainable operation of the whole computing centre. In the presentation the overview of the middleware system at GridKa is given with focus on the configuration management and monitoring. These are the crucial components of the administration task for the system with high-availability setup. The various configuration tools used at GridKa, their benefits and limitations as well as developed automation procedures of the configuration management will be discussed. The overview of the monitoring system which evaluates the information delivered by central and local grid information services and provides status and detailed diagnostics for the middleware services is presented.

  17. Implementation of Integrated System Fault Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark

    2008-01-01

    Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.

  18. Implementing Scientific Simulation Codes Highly Tailored for Vector Architectures Using Custom Configurable Computing Machines

    NASA Technical Reports Server (NTRS)

    Rutishauser, David

    2006-01-01

    The motivation for this work comes from an observation that amidst the push for Massively Parallel (MP) solutions to high-end computing problems such as numerical physical simulations, large amounts of legacy code exist that are highly optimized for vector supercomputers. Because re-hosting legacy code often requires a complete re-write of the original code, which can be a very long and expensive effort, this work examines the potential to exploit reconfigurable computing machines in place of a vector supercomputer to implement an essentially unmodified legacy source code. Custom and reconfigurable computing resources could be used to emulate an original application's target platform to the extent required to achieve high performance. To arrive at an architecture that delivers the desired performance subject to limited resources involves solving a multi-variable optimization problem with constraints. Prior research in the area of reconfigurable computing has demonstrated that designing an optimum hardware implementation of a given application under hardware resource constraints is an NP-complete problem. The premise of the approach is that the general issue of applying reconfigurable computing resources to the implementation of an application, maximizing the performance of the computation subject to physical resource constraints, can be made a tractable problem by assuming a computational paradigm, such as vector processing. This research contributes a formulation of the problem and a methodology to design a reconfigurable vector processing implementation of a given application that satisfies a performance metric. A generic, parametric, architectural framework for vector processing implemented in reconfigurable logic is developed as a target for a scheduling/mapping algorithm that maps an input computation to a given instance of the architecture. This algorithm is integrated with an optimization framework to arrive at a specification of the architecture parameters

  19. Effect of perturbations on magnetic fields as a possible problem for implementing toroidal magnetic configurations with a zero rotational transform

    SciTech Connect

    Danilkin, I. S.

    2007-10-15

    Approved reliable methods and a unified quasi-resonant approach are used to reproduce the results characterizing the effect of dangerous perturbations on three particular types of toroidal magnetic configurations with a zero rotational transform ({iota}/2{pi} = 0). An analysis is made of the perturbations whose geometry and amplitudes correspond to imperfections and defects in the assembly of the actual magnetic systems of conventional stellarators. The effect of perturbations on magnetic configurations with {iota}/2{pi} = 0 is of the same quasi-resonant nature as that for systems with {iota}/2{pi} {ne} 0 and a zero magnetic shear. However, in contrast to shearless configurations with a nonzero rotational transform, the most dangerous perturbations are those with n = 0 and m = 1, 2, 3, ? (where m is the poloidal mode number and n is the toroidal mode number) and the effect of harmonics with the smallest poloidal and toroidal numbers is more destructive and nonlocal even for the amplitudes corresponding to imperfections and defects in the assembly of conventional stellarators. Such an extremely high sensitivity of magnetic systems with {iota}/2{pi} = 0 to the perturbations under consideration may be a serious obstacle for their practical implementation.

  20. Multimedia case management system implemented in Java

    NASA Astrophysics Data System (ADS)

    Stewart, Howard D.; Davis, Midge L.; Handy, Dale L.; Kvarfordt, Kent B.; Ford, Glenn

    1999-01-01

    Managing the timely access of information is a major challenge facing law enforcement agencies. One of the areas of greatest need is that of the case management process. During the course of FY98, the Office of National Drug Control Policy (ONDCP), the Counterdrug Technology Assessment Center (CTAC), the Idaho National Engineering and Environmental Laboratory (INEEL), and the Criminal Investigative Bureau (CIB) of the state of Idaho, created a Northwest testbed to develop and integrate a multimedia case management system. A system was developed to assist investigators in tracking and maintaining investigative cases and improving access to internal and external data resources. In this paper, we discuss the results of our case management system development and the ability to present state and federal information incorporating object oriented and multimedia techniques. We then outline our plans for future research and development.

  1. Case Study and Maturity Model for Business Process Management Implementation

    NASA Astrophysics Data System (ADS)

    Rohloff, Michael

    This paper presents the implementation of Business Process Management in a large international company. The business case illustrates the main objectives and approach taken with the BPM initiative. It introduces a process management maturity assessment which was developed to assess the implementation of Business Process Management and the achievements. The maturity model is based on nine categories which comprehensively cover all aspects which impact the success of Business Process Management. Some findings of the first assessment cycle are pinpointed to illustrate the benefits and best practice exchange as a result of the assessment.

  2. Implementing AIM-based monitoring for natural resource management

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...

  3. The Agway Management Development Program: Design and Implementation

    ERIC Educational Resources Information Center

    Barth, Anthony L.; Engfer, Robert T.

    1977-01-01

    Focus is on the Agway (a farm supply and food marketing cooperative) retail store system in this informational case history and how-to approach for designing, developing, and implementing a formal corporate management program. (Editor/TA)

  4. Information for Participants Implementing Integrated Pest Management in Schools

    EPA Pesticide Factsheets

    Parents, school faculty and staff, school administrators, and pest management professionals all have important roles in planning and implementing school IPM. Find out about these roles and resources available to help.

  5. Total Quality Management: A Guide to Implementation

    DTIC Science & Technology

    1989-08-01

    FIG. s-3. WORKFLOW DIAGRAM B-6 Appendix B: Seven Basic Graphic Tools PARETO CHARTS In the late 1800s, Vilfredo Pareto , an Italian economist, found...1. Collect .. Improvement Opportunities Graph Pareto Chart 2. Prioritize & Select T Improvement Opportunities . Fishbone Diagram Pareto Chart 3...Analyze Root Causes , Solution Selection Matrix Barriers and Aids 4. Select Solution -- Trial Implementation Pareto Chart Graph 5. Conduct Trial Checklst

  6. Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

    NASA Technical Reports Server (NTRS)

    Oseguera-Lohr, Rosa; Phojanamonogkolkij, Nipa; Lohr, Gary W.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high

  7. Green Revolving Funds: An Introductory Guide to Implementation & Management

    ERIC Educational Resources Information Center

    Indvik, Joe; Foley, Rob; Orlowski, Mark

    2013-01-01

    The goal of this introductory implementation guide is to provide practical guidance for designing, implementing, and managing a green revolving fund (GRF) at a college, university, or other institution. The GRF model is widespread in higher education, with at least 79 funds in operation in North America representing over $111 million in committed…

  8. Implementing Student Peer Review: Opportunity versus Change Management

    ERIC Educational Resources Information Center

    Pharo, Emma; De Salas, Kristy

    2009-01-01

    This paper reflects on the implementation of a peer-assessment innovation in a large first-year geography unit. While the innovation had been carefully researched, difficulties in the implementation drew the authors' attention to the need for more change management to be built into the design and development. Focusing specifically on the teacher…

  9. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  10. Implementation of SAP Waste Management System

    SciTech Connect

    Frost, M.L.; LaBorde, C.M.; Nichols, C.D.

    2008-07-01

    The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

  11. Implementing Management Systems-Based Assessments

    SciTech Connect

    Campisi, John A.; Reese, Robert T.

    1999-05-03

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in centralized

  12. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    SciTech Connect

    Smith, P.R.; Sarfaty, R.

    1993-05-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility`s physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables.

  13. Software configuration management plan, 241-AY and 241-AZ tank farm MICON automation system

    SciTech Connect

    Hill, L.F.

    1997-10-30

    This document establishes a Computer Software Configuration Management Plan (CSCM) for controlling software for the MICON Distributed Control System (DCS) located at the 241-AY and 241-AZ Aging Waste Tank Farm facilities in the 200 East Area. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes. A CSCM identifies and defines the configuration items in a system (section 3.1), controls the release and change of these items throughout the system life cycle (section 3.2), records and reports the status of configuration items and change requests (section 3.3), and verifies the completeness and correctness of the items (section 3.4). All software development before initial release, or before software is baselined, is considered developmental. This plan does not apply to developmental software. This plan applies to software that has been baselined and released. The MICON software will monitor and control the related instrumentation and equipment of the 241-AY and 241-AZ Tank Farm ventilation systems. Eventually, this software may also assume the monitoring and control of the tank sludge washing equipment and other systems as they are brought on line. This plan applies to the System Cognizant Manager and MICON Cognizant Engineer (who is also referred to herein as the system administrator) responsible for the software/hardware and administration of the MICON system. This document also applies to any other organizations within Tank Farms which are currently active on the system including system cognizant engineers, nuclear operators, technicians, and control room supervisors.

  14. Total Quality Management Implementation: Selected Readings

    DTIC Science & Technology

    1989-04-01

    characteristics Although the selection of banners makes it ap-Six ey iplenentliol chracerisics pear that the three approaches are entirel,, distinc.r in fact they...individuals and as a group. As a group, they are__ bulldozer, that the steering commintee of the tran$- formation. They plan and strategizC. best leads to " ey s...modular approach en- Action a individual/group planning for sures a better transfer of knowledge Planning implementing skills on the from the classroom to

  15. Implement an ISO 14001 environmental management system

    SciTech Connect

    Schiffman, R.I.; Delaney, B.T.; Fleming, S.; Hamilton, E.

    1997-11-01

    The ISO 14001 Environmental Management System (EMS) standard brings environmental concerns into the mainstream of business operations by providing a framework for balancing and integrating environmental and economic interests. ISO 14001 requires that an organization develop an environmental management program that describes all of its environmental objectives and targets and how each will be achieved. The program must include a specific plan that details the actions required to meet each objective and target, the person(s) responsible for meeting each objective, and a time scale for when each target will be attained. Objectives and targets can be prioritized within the program, but all objectives must be included. This article outlines the benefits of developing an EMS, explains the ISO 14001 EMS standard, and provides detailed step-by-step guidance on what to do to become ISO 14001 certified.

  16. Factors that influence producer decisions to implement management strategies.

    PubMed

    Field, Thomas G

    2014-12-01

    Cow-calf enterprises in the USA are widely divergent in size, locale, resource availability, management skill, and market focus. Furthermore, variation exists in dependence on the cow-calf enterprise as a primary source of income, perception about the utility of a particular management practice or technology, and assessment of cost: benefit resulting from implementation impact decisions. Enterprises with larger cow inventories, greater dependence on income from the cattle enterprise, and that retain ownership further into the supply chain beyond the cow-calf operation are more likely to institute management protocols such as vaccination programs, defined calving seasons, and reproductive technologies. Successful cow-calf managers place the highest priority on herd nutrition, pasture and range management, herd health, financial management marketing, production management, and genetics. Management practices are more likely to be adopted when they align with a manager's perception of the utility, labor availability, favorable cost: benefit outcomes and profit motivation.

  17. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be

  18. Designing and Implementing Teacher Performance Management Systems: Pitfalls and Possibilities

    ERIC Educational Resources Information Center

    Wiener, Ross; Jacobs, Ariel

    2011-01-01

    As new performance-management-related policies go from idea to implementation, policy makers and education leaders will be called upon to flesh-out what are still broad principles in many areas. This represents a significant inflection point for the teaching profession and the management of public school systems. Early decisions will determine…

  19. The Implementation of Technology-Based SME Management Development Programmes

    ERIC Educational Resources Information Center

    Carr, James

    2005-01-01

    Learning technology is seen as one solution to the problem of delivering management training in Small and Medium-sized Enterprises (SMEs). This paper investigates how the Higher Education (HE) sector can use its growing expertise in learning technology implementation to develop effective SME management development solutions. It is found that there…

  20. 25 Point Implementation Plan to Reform Federal information Technology Management

    DTIC Science & Technology

    2010-12-09

    25 POINT IMPLEMENTATION PLAN TO REFORM FEDERAL INFORMATION TECHNOLOGY MANAGEMENT Vivek Kundra U.S. Chief Information Officer DECEMBER 9, 2 010... information Technology Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...RefoRm fedeRal infoRmaTion TeChnology managemenT ii★ ★ C2 . Align the Budget Process with the Technology Cycle

  1. Provenance management in Swift with implementation details.

    SciTech Connect

    Gadelha, L. M. R; Clifford, B.; Mattoso, M.; Wilde, M.; Foster, I.

    2011-04-01

    The Swift parallel scripting language allows for the specification, execution and analysis of large-scale computations in parallel and distributed environments. It incorporates a data model for recording and querying provenance information. In this article we describe these capabilities and evaluate interoperability with other systems through the use of the Open Provenance Model. We describe Swift's provenance data model and compare it to the Open Provenance Model. We also describe and evaluate activities performed within the Third Provenance Challenge, which consisted of implementing a specific scientific workflow, capturing and recording provenance information of its execution, performing provenance queries, and exchanging provenance information with other systems. Finally, we propose improvements to both the Open Provenance Model and Swift's provenance system.

  2. Understanding barriers to implementation of an adaptive land management program

    USGS Publications Warehouse

    Jacobson, S.K.; Morris, J.K.; Sanders, J.S.; Wiley, E.N.; Brooks, M.; Bennetts, R.E.; Percival, H.F.; Marynowski, S.

    2006-01-01

    The Florida Fish and Wildlife Conservation Commission manages over 650,000 ha, including 26 wildlife management and environmental areas. To improve management, they developed an objective-based vegetation management (OBVM) process that focuses on desired conditions of plant communities through an adaptive management framework. Our goals were to understand potential barriers to implementing OBVM and to recommend strategies to overcome barriers. A literature review identified 47 potential barriers in six categories to implementation of adaptive and ecosystem management: logistical, communication, attitudinal, institutional, conceptual, and educational. We explored these barriers through a bureau-wide survey of 90 staff involved in OBVM and personal interviews with area managers, scientists, and administrators. The survey incorporated an organizational culture assessment instrument to gauge how institutional factors might influence OBVM implementation. The survey response rate was 69%. Logistics and communications were the greatest barriers to implementing OBVM. Respondents perceived that the agency had inadequate resources for implementing OBVM and provided inadequate information. About one-third of the respondents believed OBVM would decrease their job flexibility and perceived greater institutional barriers to the approach. The 43% of respondents who believed they would have more responsibility under OBVM also had greater attitudinal barriers. A similar percentage of respondents reported OBVM would not give enough priority to wildlife. Staff believed that current agency culture was hierarchical but preferred a culture that would provide more flexibility for adaptive management and would foster learning from land management activities. In light of the barriers to OBVM, we recommend the following: (1) mitigation of logistical barriers by addressing real and perceived constraints of staff, funds, and other resources in a participatory manner; (2) mitigation of

  3. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management...

  4. Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

    NASA Technical Reports Server (NTRS)

    Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.

    2009-01-01

    Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

  5. Configuration management and software measurement in the Ground Systems Development Environment (GSDE)

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    A set of functional requirements for software configuration management (CM) and metrics reporting for Space Station Freedom ground systems software are described. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the Space Station Training Facility (SSTF) and the Space Station Control Center (SSCC), and the target systems for SSCC and SSTF. The focus is on the CM of the software following delivery to NASA and on the software metrics that relate to the quality and maintainability of the delivered software. The CM and metrics requirements address specific problems that occur in large-scale software development. Mechanisms to assist in the continuing improvement of mission operations software development are described.

  6. Millennium regional PACS management: strategies for successful implementation

    NASA Astrophysics Data System (ADS)

    Levin, Brad; Romlein, John R.; Gac, Robert J., Jr.; Chacko, Anna K.; Radvany, Martin

    2000-05-01

    With the advent of the new Millennium, Picture Archive and Communications System (PACS) technology has matured to levels sufficient to support open systems based, regional implementations. This shifts the site-centric PACS paradigm into broader scale, impacting facilities, workflow, business plans and ultimately patient care on a regional basis. Prudent and effective management of a regional implementation is critical to overall project success based upon a number of competing influences fundamental to the PACS including network infrastructure, clinical workflow, acquisition modalities, planning documentation, site preparation, acceptance testing, project communication, interface integration issues, etc. Risk mitigation is possible by understanding and managing the interrelationships of these influences through a phased approach with embedded management controls. The overall phases of regional implementation are not unlike site-centric implementations, consisting of Discovery, Planning, Preparation, Installation; Acceptance and Warranty/Maintenance; however, details which manifest over time are what provide significant management challenges. When balanced using a culturally reinforced policy of open, frequent and hands-on communication, regional PACS projects can be successfully implemented maintaining budget, schedule and scope thresholds.

  7. Total Quality Management Implementing Plan for Human Resource Management

    DTIC Science & Technology

    1989-04-01

    ainilO reo)U,;rments for their organiz7at,.ons and provide information o-n course scnIeCUies and ;7ompletions. A new subsystem for labor management... estr ict,_ve interoretations of job-relatedness in approving Agency-+unded training ard aettli~ ’-he best reSult 4or all concerned; increase cross

  8. Module Configuration

    DOEpatents

    Oweis, Salah; D'Ussel, Louis; Chagnon, Guy; Zuhowski, Michael; Sack, Tim; Laucournet, Gaullume; Jackson, Edward J.

    2002-06-04

    A stand alone battery module including: (a) a mechanical configuration; (b) a thermal management configuration; (c) an electrical connection configuration; and (d) an electronics configuration. Such a module is fully interchangeable in a battery pack assembly, mechanically, from the thermal management point of view, and electrically. With the same hardware, the module can accommodate different cell sizes and, therefore, can easily have different capacities. The module structure is designed to accommodate the electronics monitoring, protection, and printed wiring assembly boards (PWAs), as well as to allow airflow through the module. A plurality of modules may easily be connected together to form a battery pack. The parts of the module are designed to facilitate their manufacture and assembly.

  9. FORTH implementation of the heap data structure for memory management

    SciTech Connect

    Dress, W.B.

    1985-01-01

    The use of the heap for memory management provides the FORTH programmer with a versatile tool. Its use speeds program development at the conceptual level by allowing the program designer to consider dynamic arrays, garbage collection, and overlays; and at the implementation stage by providing a framework for easy manipulation of such data structures. An examination of the high-level codes leads naturally to examples of these and other techniques of dynamic data management.

  10. Subsonic Aerodynamic Assessment of Vortex Flow Management Devices on a High-Speed Civil Transport Configuration

    NASA Technical Reports Server (NTRS)

    Campbell, Bryan A.; Applin, Zachary T.; Kemmerly, Guy T.

    1999-01-01

    An experimental investigation of the effects of leading-edge vortex management devices on the subsonic performance of a high-speed civil transport (HSCT) configuration was conducted in the Langley 14- by 22-Foot Subsonic Tunnel. Data were obtained over a Mach number range of 0.14 to 0.27, with corresponding chord Reynolds numbers of 3.08 x 10 (sup 6) to 5.47 x 10 (sup 6). The test model was designed for a cruise Mach number of 2.7. During the subsonic high-lift phase of flight, vortical flow dominates the upper surface flow structure, and during vortex breakdown, this flow causes adverse pitch-up and a reduction of usable lift. The experimental results showed that the beneficial effects of small leading-edge vortex management devices located near the model reference center were insufficient to substantially affect the resulting aerodynamic forces and moments. However, devices located at or near the wiring apex region demonstrated potential for pitch control with little effect on overall lift.

  11. Integrated System Health Management (ISHM) Implementation in Rocket Engine Testing

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera

    2010-01-01

    A pilot operational ISHM capability has been implemented for the E-2 Rocket Engine Test Stand (RETS) and a Chemical Steam Generator (CSG) test article at NASA Stennis Space Center. The implementation currently includes an ISHM computer and a large display in the control room. The paper will address the overall approach, tools, and requirements. It will also address the infrastructure and architecture. Specific anomaly detection algorithms will be discussed regarding leak detection and diagnostics, valve validation, and sensor validation. It will also describe development and use of a Health Assessment Database System (HADS) as a repository for measurements, health, configuration, and knowledge related to a system with ISHM capability. It will conclude with a discussion of user interfaces, and a description of the operation of the ISHM system prior, during, and after testing.

  12. Transitions in Classroom Technology: Instructor Implementation of Classroom Management Software

    ERIC Educational Resources Information Center

    Ackerman, David; Chung, Christina; Sun, Jerry Chih-Yuan

    2014-01-01

    The authors look at how business instructor needs are fulfilled by classroom management software (CMS), such as Moodle, and why instructors are sometimes slow to implement it. Instructors at different universities provided both qualitative and quantitative responses regarding their use of CMS. The results indicate that the top needs fulfilled by…

  13. Implementation of School-Based Management in Indonesia. Monograph

    ERIC Educational Resources Information Center

    Vernez, Georges; Karam, Rita; Marshall, Jeffery H.

    2012-01-01

    This study provides a quantitative and qualitative status report on the implementation of school-based management (SBM) in Indonesia, identifies factors associated with the successful practices of SBM, and assesses SBM effects on student achievement eight years after its inception. The authors' findings are based on face-to-face surveys of…

  14. Dryden Flight Research Center Critical Chain Project Management Implementation

    NASA Technical Reports Server (NTRS)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  15. Implementing the Parent Management Training Oregon Model in The Netherlands

    ERIC Educational Resources Information Center

    Bekkema, Nienke; Wiefferink, Carin; Mikolajczak, Jochen

    2008-01-01

    In cooperation with its American developers, the Parent Management Training Oregon (PMTO) model was introduced into the Dutch youth care system at the beginning of 2006. In general, implementing new interventions in practice is no simple matter. Several factors related to the socio-political context, the organizational context, the intervention…

  16. A Necessary Evil: The Experiences of Managers Implementing Downsizing Programmes

    ERIC Educational Resources Information Center

    Noronha, Ernesto; D'Cruz, Premilla

    2006-01-01

    This paper presents the findings of a phenomenological study, which describes the experiences of human resource (HR) managers implementing a downsizing program in a steel manufacturing organization in India. Data were collected through conversational interviews. Following van Manens sententious analytic approach, the core theme of a necessary…

  17. School-Based Management: Rationale and Implementation Guidelines.

    ERIC Educational Resources Information Center

    Oswald, Lori Jo

    1995-01-01

    School-based management (SBM), the decentralization of decision-making authority to the school site, comes in many variations. However, all forms of SBM require a rethinking of how and where budgeting, curriculum, and personnel decisions are made. This bulletin provides an overview of what SBM is and how it is implemented by summarizing some of…

  18. Black-Box Description of Electron Correlation with the Spin-Extended Configuration Interaction Model: Implementation and Assessment.

    PubMed

    Tsuchimochi, Takashi; Ten-no, Seiichiro

    2016-04-12

    In our recent Communication (J. Chem. Phys. 2016, 144, 011101), we proposed Wick's theorem for nonorthogonal determinants and applied it to spin-extended configuration interaction with singles and doubles (ECISD) based on spin-projected unrestricted Hartree-Fock (SUHF), given that SUHF is a special case of nonorthogonal CI. It was shown that ECISD is accurate for bond-dissociation processes of several representative molecules. In the present work, we give a detailed derivation of ECISD and report an efficient implementation with two physically motivated preconditioning schemes in the generalized Davidson diagonalization for ECISD, whose Hamiltonian and overlap are not diagonal dominant due to SUHF's nonorthogonal character. In the first approach, we exploit the properties of corresponding pair orbitals and spin-projection operator and rotate the spin-projected CI basis so that the Hamiltonian is approximately diagonal. The second scheme is based on the normal ordered Hamiltonian, which suggests neglecting the expensive two-particle terms in the preconditioning. To enable frozen-core approximations in ECISD, core orbitals were introduced in SUHF. We also show the validity of our method with various numerical examples for static correlations, apart from the left-right correlation in bond-dissociation processes: the ground state energies of the Be isoelectronic series, excitation energies of representative small molecules, and spectroscopic constants of the strongly correlated BN singlet state. Several aspects of ECISD were studied.

  19. Implementation Of Quality Management System For Irradiation Processing Services

    NASA Astrophysics Data System (ADS)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  20. Obstacles to bottom-up implementation of marine ecosystem management.

    PubMed

    Evans, Kirsten E; Klinger, Terrie

    2008-10-01

    Ecosystem management (EM) offers a means to address multiple threats to marine resources. Despite recognition of the importance of stakeholder involvement, most efforts to implement EM in marine systems are the product of top-down regulatory control. We describe a rare, stakeholder-driven attempt to implement EM from the bottom up in San Juan County, Washington (U.S.A.). A citizens advisory group led a 2-year, highly participatory effort to develop an ecosystem-based management plan, guided by a preexisting conservation-planning framework. A key innovation was to incorporate social dimensions by designating both sociocultural and biodiversity targets in the planning process. Multiple obstacles hindered implementation of EM in this setting. Despite using a surrogate scheme, the information-related transaction costs of planning were substantial: information deficits prevented assessment of some biodiversity targets and insufficient resources combined with information deficits prevented scientific assessment of the sociocultural targets. Substantial uncertainty, practical constraints to stakeholder involvement, and the existence of multiple, potentially conflicting, objectives increased negotiation-related costs. Although information deficits and uncertainty, coupled with underinvestment in the transaction costs of planning, could reduce the long-term effectiveness of the plan itself, the social capital and momentum developed through the planning process could yield unforeseeable future gains in protection of marine resources. The obstacles we identified here will require early and sustained attention in efforts to implement ecosystem management in other grassroots settings.

  1. A knowledge management methodology for the integrated assessment of WWTP configurations during conceptual design.

    PubMed

    Garrido-Baserba, M; Reif, R; Rodriguez-Roda, I; Poch, M

    2012-01-01

    The current complexity involved in wastewater management projects is arising as the XXI century sets new challenges leading towards a more integrated plant design. In this context, the growing number of innovative technologies, stricter legislation and the development of new methodological approaches make it difficult to design appropriate flow schemes for new wastewater projects. Thus, new tools are needed for the wastewater treatment plant (WWTP) conceptual design using integrated assessment methods in order to include different types of objectives at the same time i.e. environmental, economical, technical, and legal. Previous experiences used the decision support system (DSS) methodology to handle the specific issues related to wastewater management, for example, the design of treatment facilities for small communities. However, tools developed for addressing the whole treatment process independently of the plant size, capable of integrating knowledge from many different areas, including both conventional and innovative technologies are not available. Therefore, the aim of this paper is to present and describe an innovative knowledge-based methodology that handles the conceptual design of WWTP process flow-diagrams (PFDs), satisfying a vast number of different criteria. This global approach is based on a hierarchy of decisions that uses the information contained in knowledge bases (KBs) with the aim of automating the generation of suitable WWTP configurations for a specific scenario. Expert interviews, legislation, specialized literature and engineering experience have been integrated within the different KBs, which indeed constitute one of the main highlights of this work. Therefore, the methodology is presented as a valuable tool which provides customized PFD for each specific case, taking into account process unit interactions and the user specified requirements and objectives.

  2. Flight evaluation of configuration management system concepts during transition to the landing approach for a powered-lift STOL aircraft

    NASA Technical Reports Server (NTRS)

    Franklin, J. A.; Innis, R. C.

    1980-01-01

    Flight experiments were conducted to evaluate two control concepts for configuration management during the transition to landing approach for a powered-lift STOL aircraft. NASA Ames' augmentor wing research aircraft was used in the program. Transitions from nominal level-flight configurations at terminal area pattern speeds were conducted along straight and curved descending flightpaths. Stabilization and command augmentation for attitude and airspeed control were used in conjunction with a three-cue flight director that presented commands for pitch, roll, and throttle controls. A prototype microwave system provided landing guidance. Results of these flight experiments indicate that these configuration management concepts permit the successful performance of transitions and approaches along curved paths by powered-lift STOL aircraft. Flight director guidance was essential to accomplish the task.

  3. CAVEMAN: Configuration And VErsion MANagement. User`s guide, v2.1.2

    SciTech Connect

    Dyer, K.M.

    1993-03-12

    The mission of the CAVEMAN project is to provide the tools for large code systems so that those who work on them can perform source control and configuration control on UNIX-based file servers, rather than the LC Crays. An outside product called cvs has been chosen as the underlying source control system. The initials stand for {open_quotes}Concurrent Versions System{close_quotes}. It is a freeware program that runs on most UNIX stations. To quote from the cvs man page: {open_quotes}cvs is a front end to the rcs revision control system which extends the notion of revision control from a collection of files in a single directory to a hierarchical collection of directories consisting of revision controlled files. These directories and files can be combined together to form a software release. cvs provides the functions necessary to manage these software releases and to control the concurrent editing of source files among multiple software developers.{close_quotes} While cvs may be run directly, there are several tasks in the LLNL environment that it seemed either safer or easier to automate. CAVEMAN provides the needed functionality, generally in the form of wrappers to cvs.

  4. Implementation of Anaphylaxis Management Guidelines: A Register-Based Study

    PubMed Central

    Grabenhenrich, Linus; Hompes, Stephanie; Gough, Hannah; Ruëff, Franziska; Scherer, Kathrin; Pföhler, Claudia; Treudler, Regina; Mahler, Vera; Hawranek, Thomas; Nemat, Katja; Koehli, Alice; Keil, Thomas; Worm, Margitta

    2012-01-01

    Background Anaphylaxis management guidelines recommend the use of intramuscular adrenaline in severe reactions, complemented by antihistamines and corticoids; secondary prevention includes allergen avoidance and provision of self-applicable first aid drugs. Gaps between recommendations and their implementation have been reported, but only in confined settings. Hence, we analysed nation-wide data on the management of anaphylaxis, evaluating the implementation of guidelines. Methods Within the anaphylaxis registry, allergy referral centres across Germany, Austria and Switzerland provided data on severe anaphylaxis cases. Based on patient records, details on reaction circumstances, diagnostic workup and treatment were collected via online questionnaire. Report of anaphylaxis through emergency physicians allowed for validation of registry data. Results 2114 severe anaphylaxis patients from 58 centres were included. 8% received adrenaline intravenously, 4% intramuscularly; 50% antihistamines, and 51% corticoids. Validation data indicated moderate underreporting of first aid drugs in the Registry. 20% received specific instructions at the time of the reaction; 81% were provided with prophylactic first aid drugs at any time. Conclusion There is a distinct discrepancy between current anaphylaxis management guidelines and their implementation. To improve patient care, a revised approach for medical education and training on the management of severe anaphylaxis is warranted. PMID:22590513

  5. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  6. Anesthesia information management system implementation: a practical guide.

    PubMed

    Muravchick, Stanley; Caldwell, James E; Epstein, Richard H; Galati, Maria; Levy, Warren J; O'Reilly, Michael; Plagenhoef, Jeffrey S; Rehman, Mohamed; Reich, David L; Vigoda, Michael M

    2008-11-01

    Anesthesia Information Management Systems (AIMS) display and archive perioperative physiological data and patient information. Although currently in limited use, the potential benefits of an AIMS with regard to enhancement of patient safety, clinical effectiveness and quality improvement, charge capture and professional fee billing, regulatory compliance, and anesthesia outcomes research are great. The processes and precautions appropriate for AIMS selection, installation, and implementation are complex, however, and have been learned at each site by trial and error. This collaborative effort summarizes essential considerations for successful AIMS implementation, including product evaluation, assessment of information technology needs, resource availability, leadership roles, and training.

  7. Implementation of spatial smart waste management system in malaysia

    NASA Astrophysics Data System (ADS)

    Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Wahap, N. A.; Ismail, N. M.; Ahmad, N.

    2016-06-01

    One of the challenges to innovate and create an IoT -enabled solution is in monitoring and management of the environment. Waste collection utilizing the Internet of Things (IoT) with the technology of smart wireless sensors will able to gather fill-level data from waste containers hence providing a waste monitoring solution that brings up savings in waste collection costs. One of the challenges to the local authority is how to monitor the works of contractor effective and efficiently in waste management. This paper will propose to the local authority the implementation of smart waste management in Malaysia to improve the city management and to provide better services to the public towards smart city applications.

  8. Development and implementation of a business continuity management risk index.

    PubMed

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.

  9. Freescale Semiconductor Successfully Implements an Energy Management System

    SciTech Connect

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  10. Implementing a Web-based content management system.

    PubMed

    Pomeroy, Brian; Crawford, Evan; Sinisi, Albert

    2003-01-01

    The Children's Hospital of Philadelphia transformed its web site to enhance patient satisfaction and attract new patients, as well as meet the needs of clinicians and the hospital's business plans. They accomplished this by implementing a content management system that would allow content creation and updating to be delegated to appropriate department staffers, thereby eliminating bottlenecks and unnecessary steps and ensuring that the web site receives fresh content much more quickly.

  11. 10 management considerations for implementing an endovascular hybrid OR.

    PubMed

    Eder, Sheryl P; Register, Jennifer L

    2014-09-01

    A hybrid procedure is the use of procedural techniques from different specialties to accomplish a shared procedural goal. Hybrid interventional suites combine the capabilities of an OR with the technologies of interventional radiology, thereby offering a modern solution to the care of patients with complex vascular pathology by using the least-invasive procedure possible. Management considerations for successful implementation of an endovascular hybrid OR suite include environment of care, design, retrofitting, equipment, personnel, anesthesia, procedural care, radiation protection, and financial planning.

  12. Configuration Management and Infrastructure Monitoring Using CFEngine and Icinga for Real-time Heterogeneous Data Taking Environment

    NASA Astrophysics Data System (ADS)

    Poat, M. D.; Lauret, J.; Betts, W.

    2015-12-01

    The STAR online computing environment is an intensive ever-growing system used for real-time data collection and analysis. Composed of heterogeneous and sometimes groups of custom-tuned machines, the computing infrastructure was previously managed by manual configurations and inconsistently monitored by a combination of tools. This situation led to configuration inconsistency and an overload of repetitive tasks along with lackluster communication between personnel and machines. Globally securing this heterogeneous cyberinfrastructure was tedious at best and an agile, policy-driven system ensuring consistency, was pursued. Three configuration management tools, Chef, Puppet, and CFEngine have been compared in reliability, versatility and performance along with a comparison of infrastructure monitoring tools Nagios and Icinga. STAR has selected the CFEngine configuration management tool and the Icinga infrastructure monitoring system leading to a versatile and sustainable solution. By leveraging these two tools STAR can now swiftly upgrade and modify the environment to its needs with ease as well as promptly react to cyber-security requests. By creating a sustainable long term monitoring solution, the detection of failures was reduced from days to minutes, allowing rapid actions before the issues become dire problems, potentially causing loss of precious experimental data or uptime.

  13. Implementation of Hepatitis Information Management System in Iran

    PubMed Central

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2016-01-01

    Introduction: Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. Methodology: This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design’s stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Findings: Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Conclusion: Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients’ conditions. That mentioned system paves the way for the analysis of gathered information

  14. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    PubMed

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches).

  15. Configuration and Specifications of an Unmanned Aerial Vehicle (UAV) for Early Site Specific Weed Management

    PubMed Central

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches). PMID:23483997

  16. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  17. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.; Bizier, P.; DeBarry, P.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  18. System configuration management plan for the TWRS controlled baseline database system [TCBD

    SciTech Connect

    Spencer, S.G.

    1998-09-23

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project`s requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user`s requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  19. [The German program for disease management guidelines--implementation with pathways and quality management].

    PubMed

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  20. Attitude control/momentum management of the Space Station Freedom for large angle torque-equilibrium-attitude configurations

    NASA Technical Reports Server (NTRS)

    Parlos, Alexander G.; Sunkel, John W.

    1990-01-01

    An attitude-control and momentum-management (ACMM) system for the Space Station in a large-angle torque-equilibrium-attitude (TEA) configuration is developed analytically and demonstrated by means of numerical simulations. The equations of motion for a rigid-body Space Station model are outlined; linearized equations for an arbitrary TEA (resulting from misalignment of control and body axes) are derived; the general requirements for an ACMM are summarized; and a pole-placement linear-quadratic regulator solution based on scheduled gains is proposed. Results are presented in graphs for (1) simulations based on configuration MB3 (showing the importance of accounting for the cross-inertia terms in the TEA estimate) and (2) simulations of a stepwise change from configuration MB3 to the 'assembly complete' stage over 130 orbits (indicating that the present ACCM scheme maintains sufficient control over slowly varying Space Station dynamics).

  1. Detection and management of a complex canal configuration in mesiobuccal root of maxillary first molar using three dimensional imaging

    PubMed Central

    Deepa, Velagala L.; Bollu, Indira Priyadharsini; Dhamaraju, Bhargavi; Yadla, Padmasri

    2016-01-01

    This case report discusses the identification and management of complex canal configuration of 3-2-1 in the mesiobuccal (MB) root of the maxillary left first molar. Careful attention to details of the pulpal floor and applying the knowledge of the laws of orifice location along with deepening the subpulpal groove with ultrasonic tips helped in identifying the three MB canals. Manual scouting helped in understanding the anatomic configuration; the use of three-dimensional imaging technique and spiral computed tomography (SCT) confirmed the same. SCT images showed buccolingually wide and bulbous mesiobuccal root with three separate canals at coronal third that merged into two canals in the middle and exited as a single canal at the apex. This article highlights the role of SCT in three-dimensionally analyzing the unseen rarest canal configurations that ultimately enabled the clinician to thoroughly explore, debride, and obturate the entire root canal system. PMID:27195233

  2. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  3. Integrated System Health Management: Foundational Concepts, Approach, and Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando

    2009-01-01

    A sound basis to guide the community in the conception and implementation of ISHM (Integrated System Health Management) capability in operational systems was provided. The concept of "ISHM Model of a System" and a related architecture defined as a unique Data, Information, and Knowledge (DIaK) architecture were described. The ISHM architecture is independent of the typical system architecture, which is based on grouping physical elements that are assembled to make up a subsystem, and subsystems combine to form systems, etc. It was emphasized that ISHM capability needs to be implemented first at a low functional capability level (FCL), or limited ability to detect anomalies, diagnose, determine consequences, etc. As algorithms and tools to augment or improve the FCL are identified, they should be incorporated into the system. This means that the architecture, DIaK management, and software, must be modular and standards-based, in order to enable systematic augmentation of FCL (no ad-hoc modifications). A set of technologies (and tools) needed to implement ISHM were described. One essential tool is a software environment to create the ISHM Model. The software environment encapsulates DIaK, and an infrastructure to focus DIaK on determining health (detect anomalies, determine causes, determine effects, and provide integrated awareness of the system to the operator). The environment includes gateways to communicate in accordance to standards, specially the IEEE 1451.1 Standard for Smart Sensors and Actuators.

  4. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  6. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  7. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. KARMA: Managing business rules for specification to implementation

    SciTech Connect

    Sobieski, J.; Krovvidy, S.; McClintock, C.; Thorpe, M.

    1996-12-31

    Fannie Mae is a congressionally chartered, shareholder-owned company and the nation`s largest source of conventional home mortgage funds. Fannie Mae purchases and securitizes loans and is considered the leader in the secondary mortgage market. Because of its strong leadership role, Fannie Mae`s policies for loan eligibility set the standard in the mortgage industry and applying these policies consistently and effectively is critical to Fannie Mae`s mission and profitability. Fannie Mae`s policies for selling and servicing mortgage loans span the business functions of the secondary mortgage market and therefore are contained in many different software applications. Managing policy across multiple business applications became increasingly complex. To meet these demands, Fannie Mae developed KARMA (Knowledge Acquisition and Rule Management Assistant) and the Business Rule Server to allow policy changes to be implemented quickly throughout its software application environment and to provide business users with direct ownership and management of Fannie Mae`s policies in a way that seamlessly integrates policy into the software applications. KARMA is designed to support the management of these policies independent of the applications in which they are embedded. KARMA generates executable business rules which become part of the Business Rule Server. As a result, policy is managed centrally and no longer embedded in multiple applications. KARMA and the Business Rule Server have been running in production supporting the Cash Delivery application since July, 1995.

  10. 76 FR 22944 - Pipeline Safety: Notice of Public Webinars on Implementation of Distribution Integrity Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... on Implementation of Distribution Integrity Management Programs AGENCY: Pipeline and Hazardous... state and Federal Distribution Integrity Management Program Implementation Team (Team) recently completed a series of pilot inspections of gas distribution operators' distribution integrity...

  11. Configuration Analysis Tool

    NASA Technical Reports Server (NTRS)

    Merwarth, P. D.

    1983-01-01

    Configuration Analysis Tool (CAT), is information storage and report generation system for aid of configuration management activities. Configuration management is discipline composed of many techniques selected to track and direct evolution of complex systems. CAT is interactive program that accepts, organizes and stores information pertinent to specific phases of project.

  12. Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

    NASA Technical Reports Server (NTRS)

    Latorella, Kara A.

    2015-01-01

    Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to

  13. Implementing Total Quality Management (TQM) 1: The Command Imperative

    DTIC Science & Technology

    1992-12-01

    AL-SR-1992-0012 AD-A259 885 IMPLEMENTING TOTAL QUALITY A MANAGEMENT (TQM) I: R THE COMMAND IMPERATIVE M S T Charles N. Weaver R Malcolm T. Upton...Special Report for Period November 1990 - November 1991 B 0 R A Approved for public release; distribution is unlimited. T 0T R DT y :71-1vCTE9 g B • , |H...nationals. This special report has been reviewed and is approved for publication. COL T O, aAUSAF WILUAM E. ALLEY, Technical Di r Project Scientist

  14. Implementing Model-Check for Employee and Management Satisfaction

    NASA Technical Reports Server (NTRS)

    Jones, Corey; LaPha, Steven

    2013-01-01

    This presentation will discuss methods to which ModelCheck can be implemented to not only improve model quality, but also satisfy both employees and management through different sets of quality checks. This approach allows a standard set of modeling practices to be upheld throughout a company, with minimal interaction required by the end user. The presenter will demonstrate how to create multiple ModelCheck standards, preventing users from evading the system, and how it can improve the quality of drawings and models.

  15. Implementation of Industrial Work Practice management at vocational high school

    NASA Astrophysics Data System (ADS)

    Widodo, Joko; Samsudi, Sunyoto

    2017-03-01

    The purpose of this study was to develop a management model of entrepreneurship-based Industrial Work Practice (Prakerin) at Vocational High School. This research was planned for three years under Research and Development design. The respondents were public and private Vocational High Schools in Semarang, Salatiga and District of Demak, Central Java, Indonesia. Data were collected through interviews, questionnaires, observation, and documentation. The data were analyzed qualitatively and quantitatively. Preliminary study shows that the implementation of Industrial Work Practice at Vocational High School, which has been carried out, was only to prepare the graduates to become an employee of the industry instead of entrepreneur. Further study is needed to develop a management model of entrepreneurship-based Industrial Work Practice at Vocational High School.

  16. Transient thermal management comparison of a microprocessor using PCMs in various configurations

    NASA Astrophysics Data System (ADS)

    Thenmozhi, R.; Sharmeela, C.; Natarajan, P.; Velraj, R.

    2011-12-01

    There has been a strong interest in the use of Phase Change Materials (PCMs) for the transient thermal abatement of high powered microprocessor. This paper presents a set of transient computational analysis for selected IC packages with the purpose of calibrating the merits of PCM in different configurations. The transient analysis of high powered microprocessors with heat sinks was performed as a benchmark for comparison with the same microprocessors fitted with PCM in the following configurations: a) PCM imbedded into the finned region of the heat sink, b) PCM mounted between the microprocessor and heat sink, c) sealed PCM underfill to the microprocessor and d) PCM fitted to the underside of the printed circuit board directly beneath the microprocessor. The analysis was performed using a commercial CFD tool together with an approximation to the phase change mechanism using the slope method. Results indicate the merit of each configuration.

  17. Graphical User Interface Development and Design to Support Airport Runway Configuration Management

    NASA Technical Reports Server (NTRS)

    Jones, Debra G.; Lenox, Michelle; Onal, Emrah; Latorella, Kara A.; Lohr, Gary W.; Le Vie, Lisa

    2015-01-01

    The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

  18. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  19. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  20. E-Resources Management: How We Positioned Our Organization to Implement an Electronic Resources Management System

    ERIC Educational Resources Information Center

    White, Marilyn; Sanders, Susan

    2009-01-01

    The Information Services Division (ISD) of the National Institute of Standards and Technology (NIST) positioned itself to successfully implement an electronic resources management system. This article highlights the ISD's unique ability to "team" across the organization to realize a common goal, develop leadership qualities in support of…

  1. QbD implementation and Post Approval Lifecycle Management (PALM).

    PubMed

    Ohage, Ettore; Iverson, Raquel; Krummen, Lynne; Taticek, Ron; Vega, Maria

    2016-09-01

    Quality by design (QbD) is a global regulatory initiative with the goal of enhancing pharmaceutical development through the proactive design of pharmaceutical manufacturing process and controls to consistently deliver the intended performance of the product. The principles of pharmaceutical development relevant to QbD are described in the ICH guidance documents (ICHQ8-11) [1-3]. An integrated set of risk assessments and their related elements developed at Roche/Genentech were designed to provide an overview of product and process knowledge for the production of a recombinant monoclonal antibody. This chapter describes concepts for implementing the control strategy for a monoclonal antibody including a Design Space for routine commercial manufacturing, and the Post Approval Lifecycle Management (PALM) plan that is used to manage any remaining risks during the commercial lifecycle. The PALM plan is part of the submitted dossier in the regional section and serves as a regulatory agreement between the manufacturer and the health authority specifying how process and product attributes are monitored to ensure both remain within a controlled state post-approval, process parameter changes are managed within the design space, and the control system is updated as necessary based on further process and product knowledge.

  2. United States Naval Hospital Ship Program: History, Evolution, and Configuration Management.

    DTIC Science & Technology

    1987-12-01

    frequent trips to Mexico and has conducted a South Pacific cruise to Fiji, Tanga, Samoa and New Zealand. The ship configuration of M/V ANASTASIS is...February 19, 1987. 32. Interview with CDR Dick Cummings , SUPSHIP New Construction Project Officer, San Diego, CA, February 6, 1987. 33. Interview with Mr...Department of Defense, Washington, D. C., p. 2, October 18, 1972. 60. Telephone interview with CDR Cummings , SUPSHIP, San Diego, CA, New Construction

  3. OSD CALS Architecture Master Plan Study. Concept Paper. Configuration Management. Volume 28

    DTIC Science & Technology

    1989-10-01

    Prepared by I U.S. Department of Transportation Research and Special Programs Administration Transportation Systems Center Cambridge, MA 02142 I I I Use of...are reconciled or that the differences will not affect the item’s performance. Transportation Systems Center - page 7 Octobe- 11. 1989 During the...configuration in- formation for each source of data. I Transportation Systems Center - page 8 October 11, 1989 I I. 2.3 CM Data CM data defines and controls

  4. Air Force Space Command. Space and Missile Systems Center Standard. Configuration Management

    DTIC Science & Technology

    2008-06-13

    Assigning serial and lot numbers , as necessary, to establish the CI effectivity of each configuration of each item of hardware, software and firmware... numbers . The contractor shall assign serial/ lot numbers to like items, or to groups (lots) of like items, identified with a specific Government...nomenclature, unless otherwise specified in the contract. The serial/ lot numbers shall be; • A maximum of 15 alphanumeric characters, with at least the last

  5. Model for prioritizing best management practice implementation: sediment load reduction.

    PubMed

    Jang, Taeil; Vellidis, George; Hyman, Jeffrey B; Brooks, Erin; Kurkalova, Lyubov A; Boll, Jan; Cho, Jaepil

    2013-01-01

    Understanding the best way to allocate limited resources is a constant challenge for water quality improvement efforts. The synoptic approach is a tool for geographic prioritization of these efforts. It uses a benefit-cost framework to calculate indices for functional criteria in subunits (watersheds, counties) of a region and then rank the subunits. The synoptic approach was specifically designed to incorporate best professional judgment in cases where information and resources are limited. To date, the synoptic approach has been applied primarily to local or regional wetland restoration prioritization projects. The goal of this work was to develop a synoptic model for prioritizing watersheds within which suites of agricultural best management practices (BMPs) can be implemented to reduce sediment load at the watershed outlets. The model ranks candidate watersheds within an ecoregion or river basin so that BMP implementation within the highest ranked watersheds will result in the most sediment load reduction per conservation dollar invested. The model can be applied anywhere and at many scales provided that the selected suite of BMPs is appropriate for the evaluation area's biophysical and climatic conditions. The model was specifically developed as a tool for prioritizing BMP implementation efforts in ecoregions containing watersheds associated with the USDA-NRCS conservation effects assessment project (CEAP). This paper presents the testing of the model in the little river experimental watershed (LREW) which is located near Tifton, Georgia, USA and is the CEAP watershed representing the southeastern coastal plain. The application of the model to the LREW demonstrated that the model represents the physical drivers of erosion and sediment loading well. The application also showed that the model is quite responsive to social and economic drivers and is, therefore, best applied at a scale large enough to ensure differences in social and economic drivers across the

  6. NASE 2015: Implementation of a Management Quality System

    NASA Astrophysics Data System (ADS)

    Ros, Rosa Maria; García, Beatriz; Santa Maria, Delia

    2015-08-01

    ISO 29990:2010, Learning services for non-formal education and training - Basic requirements for service providers, proposes enhance transparency and allow comparison on a worldwide basis of learning services, offering a single alternative backed by international consensus to the huge variety of national service and management standards which now exists in the field of non-formal learning. The objective of ISO 29990:2010 is to provide a generic model for quality professional practice and performance, and a common reference for learning service providers and their clients in the design, development and delivery of non-formal education, training and development.NASE project, which was born as a consequence of the implementation of IAU-10 Years Strategic Plan and it is in agreement with the proposal to increase the interest and efforts of IAU on schools before the university and constitutes good objective for the implementation of ISO 29990-2010.Taking into account the main objectives of the Strategic Plan, it is possible to remark that NASE acts on all the education levels, and had, during the past 5 years a big impact because Ministries of Education, Universities and Planetariums are involved. After 5 years NASE organized more than 60 courses in about 20 countries distributed in America, Africa, Asia and Europe. In many countries local governments changed their curriculum according NASE course contents (i.e. Nicaragua, Argentina and Honduras).The knowledge obtained by teachers is evaluated by the department of education of the local government or universities who participated. NASE acts as part of the Professional formation of Professors in Science and in this sense is a Program directed to the Tertiary and University Education.After 5 years of development, we present the implementation of a Quality Management System, according to ISO 29990:2010, devoted to Learning services for non-formal education and training. Basic requirements for service providers, and show

  7. PIV Logon Configuration Guidance

    SciTech Connect

    Lee, Glen Alan

    2016-03-04

    This document details the configurations and enhancements implemented to support the usage of federal Personal Identity Verification (PIV) Card for logon on unclassified networks. The guidance is a reference implementation of the configurations and enhancements deployed at the Los Alamos National Laboratory (LANL) by Network and Infrastructure Engineering – Core Services (NIE-CS).

  8. Implementing agricultural phosphorus science and management to combat eutrophication.

    PubMed

    Kleinman, Peter J A; Sharpley, Andrew N; Withers, Paul J A; Bergström, Lars; Johnson, Laura T; Doody, Donnacha G

    2015-03-01

    Experience with implementing agricultural phosphorus (P) strategies highlights successes and uncertainty over outcomes. We examine case studies from the USA, UK, and Sweden under a gradient of voluntary, litigated, and regulatory settings. In the USA, voluntary strategies are complicated by competing objectives between soil conservation and dissolved P mitigation. In litigated watersheds, mandated manure export has not wrought dire consequences on poultry farms, but has adversely affected beef producers who fertilize pastures with manure. In the UK, regulatory and voluntary approaches are improving farmer awareness, but require a comprehensive consideration of P management options to achieve downstream reductions. In Sweden, widespread subsidies sometime hinder serious assessment of program effectiveness. In all cases, absence of local data can undermine recommendations from models and outside experts. Effective action requires iterative application of existing knowledge of P fate and transport, coupled with unabashed description and demonstration of tradeoffs to local stakeholders.

  9. STARDUST: implementing a new manage-to-budget paradigm

    NASA Astrophysics Data System (ADS)

    Atkins, Kenneth L.; Martin, Bredt D.; Vellinga, Joseph M.; Price, Rick A.

    2003-01-01

    the leveraging goal by serving two projects, STARDUST and Mars Surveyor '98. It avoided duplicate project-unique personnel structures and offered cost benefits to each project. This paper provides details and example metrics characterizing the aggressive application of the design-to-cost paradigm and implementation by the STARDUST management team to achieve success under the Discovery Program budget constraints.

  10. IPM: Integrated Pest Management Kit for Building Managers. How To Implement an Integrated Pest Management Program in Your Building(s).

    ERIC Educational Resources Information Center

    Mitchell, Brad

    This management kit introduces building managers to the concept of Integrated Pest Management (IPM), and provides the knowledge and tools needed to implement an IPM program in their buildings. It discusses the barriers to implementing an IPM program, why such a program should be used, and the general guidelines for its implementation. Managerial…

  11. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    ERIC Educational Resources Information Center

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into…

  12. Boundary work for implementing adaptive management: A water sector application.

    PubMed

    Adem Esmail, Blal; Geneletti, Davide; Albert, Christian

    2017-03-24

    Boundary work, defined as effort to mediate between knowledge and action, is a promising approach for facilitating knowledge co-production for sustainable development. Here, we investigate a case study of knowledge co-production, to assess the applicability of boundary work as a conceptual framework to support implementing adaptive management in the water sector. We refer to a boundary work classification recently proposed by Clark et al., (2016), based on three types of knowledge uses, i.e. enlightenment, decision-, and negotiation-support, and three types of sources, i.e. personal expertise, single, and multiple communities of expertise. Our empirical results confirm boundary work has been crucial for the three types of knowledge use. For enlightenment and decision-support, effective interaction among knowledge producers and users was achieved through diverse boundary work practices, including joint agenda setting, and sharing of data and expertise. This initial boundary work eased subsequent knowledge co-production for decision-support and negotiations, in combination with stepping up of cooperation between relevant actors, suitable legislation and pressure for problem solving. Our analysis highlighted the temporal dimension matters - building trust around enlightenment first, and then using this as a basis for managing knowledge co-production for decision-, and negotiation support. We reconfirmed that boundary work is not a single time achievement, rather is a dynamic process, and we emphasized the importance of key actors driving the process, such as water utilities. Our results provide a rich case study of how strategic boundary work can facilitate knowledge co-production for adaptive management in the water sector. The boundary work practices employed here could also be transferred to other cases. Water utilities, as intermediaries between providers and beneficiaries of the important water-related ecosystem service of clean water provision, can indeed serve

  13. Systems Modeling to Implement Integrated System Health Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Jorge F.; Walker, Mark; Morris, Jonathan; Smith, Harvey; Schmalzel, John

    2007-01-01

    ISHM capability includes: detection of anomalies, diagnosis of causes of anomalies, prediction of future anomalies, and user interfaces that enable integrated awareness (past, present, and future) by users. This is achieved by focused management of data, information and knowledge (DIaK) that will likely be distributed across networks. Management of DIaK implies storage, sharing (timely availability), maintaining, evolving, and processing. Processing of DIaK encapsulates strategies, methodologies, algorithms, etc. focused on achieving high ISHM Functional Capability Level (FCL). High FCL means a high degree of success in detecting anomalies, diagnosing causes, predicting future anomalies, and enabling health integrated awareness by the user. A model that enables ISHM capability, and hence, DIaK management, is denominated the ISHM Model of the System (IMS). We describe aspects of the IMS that focus on processing of DIaK. Strategies, methodologies, and algorithms require proper context. We describe an approach to define and use contexts, implementation in an object-oriented software environment (G2), and validation using actual test data from a methane thruster test program at NASA SSC. Context is linked to existence of relationships among elements of a system. For example, the context to use a strategy to detect leak is to identify closed subsystems (e.g. bounded by closed valves and by tanks) that include pressure sensors, and check if the pressure is changing. We call these subsystems Pressurizable Subsystems. If pressure changes are detected, then all members of the closed subsystem become suspect of leakage. In this case, the context is defined by identifying a subsystem that is suitable for applying a strategy. Contexts are defined in many ways. Often, a context is defined by relationships of function (e.g. liquid flow, maintaining pressure, etc.), form (e.g. part of the same component, connected to other components, etc.), or space (e.g. physically close

  14. Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

    NASA Astrophysics Data System (ADS)

    Wan, Jiangping; Jones, James D.

    2013-11-01

    The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.

  15. Implementing ecosystem management in public agencies: lessons from the U.S. Bureau of Land Management and the Forest Service.

    PubMed

    Koontz, Tomas M; Bodine, Jennifer

    2008-02-01

    Ecosystem management was formally adopted over a decade ago by many U.S. natural resource agencies, including the Forest Service and the Bureau of Land Management. This approach calls for management based on stakeholder collaboration; interagency cooperation; integration of scientific, social, and economic information; preservation of ecological processes; and adaptive management. Results of previous studies indicate differences in the extent to which particular components of ecosystem management would be implemented within the U.S. Forest Service and the Bureau of Land Management and suggest a number of barriers thought to impede implementation. Drawing on survey and interview data from agency personnel and stakeholders, we compared levels of ecosystem-management implementation in the Forest Service and Bureau of Land Management and identified the most important barriers to implementation. Agency personnel perceived similarly high levels of implementation on many ecosystem-management components, whereas stakeholders perceived lower levels. Agencies were most challenged by implementation of preservation of ecological processes, adaptive management, and integration of social and economic information, whereas the most significant barriers to implementation were political, cultural, and legal.

  16. Large-scale parallel configuration interaction. I. Nonrelativistic and scalar-relativistic general active space implementation with application to (Rb-Ba)+.

    PubMed

    Knecht, Stefan; Jensen, Hans Jorgen Aa; Fleig, Timo

    2008-01-07

    We present a parallel implementation of a string-driven general active space configuration interaction program for nonrelativistic and scalar-relativistic electronic-structure calculations. The code has been modularly incorporated in the DIRAC quantum chemistry program package. The implementation is based on the message passing interface and a distributed data model in order to efficiently exploit key features of various modern computer architectures. We exemplify the nearly linear scalability of our parallel code in large-scale multireference configuration interaction (MRCI) calculations, and we discuss the parallel speedup with respect to machine-dependent aspects. The largest sample MRCI calculation includes 1.5x10(9) Slater determinants. Using the new code we determine for the first time the full short-range electronic potentials and spectroscopic constants for the ground state and for eight low-lying excited states of the weakly bound molecular system (Rb-Ba)+ with the spin-orbit-free Dirac formalism and using extensive uncontracted basis sets. The time required to compute to full convergence these electronic states for (Rb-Ba)+ in a single-point MRCI calculation correlating 18 electrons and using 16 cores was reduced from more than 10 days to less than 1 day.

  17. Large-scale parallel configuration interaction. I. Nonrelativistic and scalar-relativistic general active space implementation with application to (Rb-Ba)+

    NASA Astrophysics Data System (ADS)

    Knecht, Stefan; Jensen, Hans Jørgen Aa.; Fleig, Timo

    2008-01-01

    We present a parallel implementation of a string-driven general active space configuration interaction program for nonrelativistic and scalar-relativistic electronic-structure calculations. The code has been modularly incorporated in the DIRAC quantum chemistry program package. The implementation is based on the message passing interface and a distributed data model in order to efficiently exploit key features of various modern computer architectures. We exemplify the nearly linear scalability of our parallel code in large-scale multireference configuration interaction (MRCI) calculations, and we discuss the parallel speedup with respect to machine-dependent aspects. The largest sample MRCI calculation includes 1.5×109 Slater determinants. Using the new code we determine for the first time the full short-range electronic potentials and spectroscopic constants for the ground state and for eight low-lying excited states of the weakly bound molecular system (Rb-Ba)+ with the spin-orbit-free Dirac formalism and using extensive uncontracted basis sets. The time required to compute to full convergence these electronic states for (Rb-Ba)+ in a single-point MRCI calculation correlating 18 electrons and using 16 cores was reduced from more than 10days to less than 1day.

  18. Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)

    SciTech Connect

    Cooper, W.E.

    2000-09-29

    Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

  19. Behavior-based network management: a unique model-based approach to implementing cyber superiority

    NASA Astrophysics Data System (ADS)

    Seng, Jocelyn M.

    2016-05-01

    Behavior-Based Network Management (BBNM) is a technological and strategic approach to mastering the identification and assessment of network behavior, whether human-driven or machine-generated. Recognizing that all five U.S. Air Force (USAF) mission areas rely on the cyber domain to support, enhance and execute their tasks, BBNM is designed to elevate awareness and improve the ability to better understand the degree of reliance placed upon a digital capability and the operational risk.2 Thus, the objective of BBNM is to provide a holistic view of the digital battle space to better assess the effects of security, monitoring, provisioning, utilization management, allocation to support mission sustainment and change control. Leveraging advances in conceptual modeling made possible by a novel advancement in software design and implementation known as Vector Relational Data Modeling (VRDM™), the BBNM approach entails creating a network simulation in which meaning can be inferred and used to manage network behavior according to policy, such as quickly detecting and countering malicious behavior. Initial research configurations have yielded executable BBNM models as combinations of conceptualized behavior within a network management simulation that includes only concepts of threats and definitions of "good" behavior. A proof of concept assessment called "Lab Rat," was designed to demonstrate the simplicity of network modeling and the ability to perform adaptation. The model was tested on real world threat data and demonstrated adaptive and inferential learning behavior. Preliminary results indicate this is a viable approach towards achieving cyber superiority in today's volatile, uncertain, complex and ambiguous (VUCA) environment.

  20. Energy management of electric and hybrid vehicles dependent on powertrain configuration

    NASA Astrophysics Data System (ADS)

    Varga, Bogdan Ovidiu

    2012-06-01

    Electric and hybrid vehicles are going to become the most reliable source of transport for future years. The CO2 and NOx targets in Euro 6 normative puts the producers of vehicles in a dilemma, whether to adapt the internal combustion engines further, or to develop hybrid or electric power trains that are going to reach the pollution limit of the future norms or to go below that. Before acting a well-developed strategy in determining the optimum power flow has to be developed by producers; CRUISE software is a tool with the unique and special characteristics to determine the optimum in this highly important area. Whether electric vehicle, electric vehicle with range extender or a hybrid with CVT or planetary gearbox, the complexity of the mathematical modules remains the same, giving the developer the possibility to create complex functions and distinctive characteristics for each component of the vehicle. With such a powerful tool it becomes extremely easy to evaluate the energy flow in all directions, from electric machine to the battery, from electric machine to the power generator, and from the electric machine to the internal combustion engine. Applying to the (Electric Vehicle, Electric Vehicle with Range Extender, Hybrid vehicle with CVT, Hybrid vehicle with planetary gear set) the ECE-15 in a virtual environment (urban driving cycle) the simulation results show a different usage, rate of storage and efficiency concerning the energy, this being dependent of the power train configuration in most part.

  1. Implementation of an Anesthesia Information Management System (AIMS).

    PubMed

    Douglas, James R; Ritter, Melody J

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care-related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges.

  2. Implementation of an Anesthesia Information Management System (AIMS)

    PubMed Central

    Douglas, James R.; Ritter, Melody J.

    2011-01-01

    During the administration of anesthesia, the anesthesia provider has historically created a paper record, charted manually, that included extensive patient care–related data (vital signs, other parameters, etc) and commentaries. DocuSys, a proprietary anesthesia information management system (AIMS), creates an electronic version of the anesthesia record and provides additional information. It electronically captures data from clinical monitors and other sources, including scheduling applications and laboratory computers. The AIMS facilitates chart entries such as drug doses and case narratives. Benefits of an AIMS include improved legibility of the anesthesia record and greater efficiency in documentation efforts. Use of the AIMS assists the practitioner with decision support logic, such as the timing of antibiotic administration and the inclusion of legally required documentation. Upon case completion, the AIMS data are immediately available to other information systems, such as billing and medical records. Data can be made available from a single case or, more important, from thousands of cases to analyze variables such as efficiency of services, adherence to best practices, patient outcomes, and clinical research. The AIMS was deployed at the main campus of the Ochsner Health System on March 26, 2009. In this article, we discuss the issues involved in the AIMS implementation process: the successes, surprises, and continued challenges. PMID:21734847

  3. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  4. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  5. Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

    NASA Technical Reports Server (NTRS)

    Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)

    2002-01-01

    NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

  6. Successfully Managing the Implementation of a DIP System.

    ERIC Educational Resources Information Center

    Baker, Nick

    1993-01-01

    Describes a British oil company's implementation of a document image processing system emphasizing the business and organizational issues. The project's objectives, perceived benefits, and issues of system ownership, planning, and implementation are described. An appendix includes documentation tables. (EAM)

  7. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  8. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  9. 77 FR 5048 - Notice of Bureau of Land Management Implementation of Recreation Resource Advisory Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... Bureau of Land Management Notice of Bureau of Land Management Implementation of Recreation Resource Advisory Committee Provisions of the Federal Lands Recreation Enhancement Act AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: Notice is hereby given of the Bureau of Land Management's...

  10. Succession planning for RNs: implementing a nurse management internship.

    PubMed

    Wendler, M Cecilia; Olson-Sitki, Kristi; Prater, Marsha

    2009-01-01

    The nursing shortage affects all levels, including the pivotal role of nurse managers, who may find themselves functioning in a complex, stressful work environment. In this increasingly difficult milieu, succession planning for nurse manager turnover is imperative. The authors describe an evidence-based, theoretically driven nurse management internship that allows staff nurses to explore the nurse manager role.

  11. Family exemplars during implementation of a home pain management intervention.

    PubMed

    Wiggins, Shirley A

    2009-01-01

    Postoperative pain and symptom management at home following pediatric tonsillectomy and adenoidectomy (T & A) is challenging. There are few randomized clinical trials that have established postoperative care interventions that are specific and effective during home recovery. The purpose of this pilot feasibility study was to describe how children and their families implemented a randomly assigned alarm intervention designed to promote postoperative around-the-clock administration of analgesics. Thirteen children from 12 through 18 years of age were randomly assigned to either the around-the-clock (RTC) intervention group (n = 7) or the usual care group (UCG) of controls (n = 6). The RTC intervention group was requested to use an alarm as a reminder to awaken and administer analgesia during the nighttime hours of sleep. Children randomly assigned to the UCG of controls were given the same discharge education as the RTC intervention group that emphasized around-the-clock administration of analgesia. The UCG of controls were not requested to use the alarm intervention. Both groups documented pain intensity and other symptoms daily for 3 days in a diary. All children wore an actigraphy-score wrist monitor to assess sleep during the same 3 days. Telephone interviews were conducted with the children and mothers at 24 hours and 10 to 14 days after surgery. Nonparametric statistics were used to compare differences between the two groups. Children in the RTC intervention group administered significantly (p = .014) more analgesics by the second postoperative day than the UCG of controls. Pain intensity was moderate to severe for both groups. The mean hours of nighttime sleep for the two groups did not differ. Themes that emerged from the qualitative analysis of the interviews included painful challenges; struggling with decisions; making things work; a lengthy recovery; and family support. Results supported the need for research to establish evidenced-based home care

  12. Individual medication management system (IMMS) implementation in pharmacists' opinion.

    PubMed

    Waszyk-Nowaczyk, Magdalena; Lawicki, Sebastian; Michalak, Michał; Simon, Marek

    2014-01-01

    Many countries of the world including Poland, are taking actions for improving the role of the pharmacist as a health care professional. One of those is implementation of pharmaceutical care (PC), as a documented specialist medical service, which also includes pharmacist interventions, such as preparing Individual Medication Management System (IMMS), to enhance patient's adherence. Because of the chance to monitor the dosage and to detect and prevent drug problems occurrence, IMMS is thought to be an opportunity for individualized, effective and safe patient's pharmacotherapy. The aim of the study was to define pharmacists' attitudes toward IMMS. The study included also the evaluation of pharmacist-physician cooperation to determine whether IMMS can improve partnership among health care professionals for proper patient's care. The survey was conducted in Poznań, between June 2011 and March 2012. An anonymous questionnaire was delivered personally to pharmacists. Each questionnaire was provided with a short information brochure attached and presentation of demos how to use IMMS. The survey covered 129 pharmacists (76.7% women and 23.3% men) where 48.8% had up to 5 years length of service as a pharmacist, 24.8% - 6-10 years, 14.9% - 11-20 years and 11.5% - 21 and more years. Most of the participants did not have specialization (80.6%) and only 5.4% had Ph.D. degree. Survey confirmed that 64.8% of pharmacists (p < 0.0001), mainly with the shortest length of service (p = 0.02268) and without specialty (p = 0.00244) didn't cooperate with physicians, but 68.8% of respondents emphasized that the range of cooperation could increase by IMMS application (p < 0.00001). About 50.0% of respondents' considered that patients would be interested in IMMS usage (p = 0.00079) and in 71.9% opinions, it would attach the patient to specific community pharmacy (p < 0.00001). This statement was confirmed by respondents with the shortest length of services (p = 0.00659). Proposed dosing

  13. Comparative thermal analysis of alternate Cryogenic Fluid Management Experiment (CFME) configurations

    NASA Technical Reports Server (NTRS)

    Merino, F.; Oneill, R. F.

    1980-01-01

    The Cryogenic Fluid Management Experiment (CFME) was analyzed to assess the feasibility and advisability of deleting the vapor cooled shield (VCS) from the baseline CFME insulation and pressure control system. Two alternate concepts of CFME insulation and pressure control, neither of which incorporated the VCS, were investigated. The first concept employed a thermodynamic vent system (TVS) to throttle the flow through an internal wall mounted heat exchanger (HX) within the pressure vessel to decrease boiloff and pressure rise rate, while the second concept utilized a TVS without an internal heat exchanger. Only the first concept was viable. Its performance was assessed for a seven day mission and found to be satisfactory. It was also concluded that VCS development costs would be greater than for an internal HX installation. Based upon the above comparisons, the HX was recommended as a replacement for the VCS.

  14. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    ERIC Educational Resources Information Center

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  15. 480TH Reconnaissance Technical Group (RTG) Management Information System. Volume II. Production Management Sub-System Implementation Report.

    DTIC Science & Technology

    The report documents the implementation of the production management sub-system, management information system for the 480th RTG, tactical air...turnover for the production management sub-system and the time period of the contract. Also included is a matrix of the information reports produced by

  16. The Implementation of Enrollment Management at Two Public Universities Experiencing Demographic and Funding Challenges

    ERIC Educational Resources Information Center

    Lee, Stephen

    2010-01-01

    The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…

  17. 77 FR 50985 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... Advisory Committee for Implementation of the National Forest System Land Management Planning Rule will meet... Forest System Land Management Rule. The meeting is open to the public. The purpose of the meeting is to... Forest Service National Advisory Committee for Implementation of the National Forest System...

  18. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD... designed to implement the 2003 Air Quality Management Plan (AQMP) control measure, WST-01, and establish... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  19. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  20. Implementation of the Air Program Information Management System (APIMS) Inspection Module

    DTIC Science & Technology

    2009-05-01

    7 5 T H A I R B A S E W I N G Implementation of the Air Program Information Management System (APIMS) Inspection Module 2009 Environment...Implementation of the Air Program Information Management System (APIMS) Inspection Module 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  1. Effective design, implementation and management of change in healthcare.

    PubMed

    Allen, Belinda

    2016-09-14

    Changes in healthcare organisations are common, and their implementation is often complex and challenging. Change is often implemented suboptimally, and can have several negative effects on staff turnover, patient care and budget targets. To minimise and avoid negative outcomes, a systematic three-stage change process that comprises preparing for change, implementing change, and evaluating and sustaining change can be followed. In the first stage, before commencing any change activities, time and attention should be given to conducting detailed analyses and preparatory work to establish the foundation for the implementation phase. In the second stage, a clear set of multiple implementation tactics are used to ensure the change process is effective. In the final stage, an evaluation of the success of the change is undertaken and measures are put in place to ensure it is sustained over time. It is only by following a methodical change process such as this that changes can be implemented effectively in healthcare organisations.

  2. Integrated System Health Management (ISHM): Systematic Capability Implementation

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Holland, Randy; Schmalzwel, John; Duncavage, Dan

    2006-01-01

    This paper provides a credible approach for implementation of ISHM capability in any system. The requirements and processes to implement ISHM capability are unique in that a credible capability is initially implemented at a low level, and it evolves to achieve higher levels by incremental augmentation. In contrast, typical capabilities, such as thrust of an engine, are implemented once at full Functional Capability Level (FCL), which is not designed to change during the life of the product. The approach will describe core ingredients (e.g. technologies, architectures, etc.) and when and how ISHM capabilities may be implemented. A specific architecture/taxonomy/ontology will be described, as well as a prototype software environment that supports development of ISHM capability. This paper will address implementation of system-wide ISHM as a core capability, and ISHM for specific subsystems as expansions and evolution, but always focusing on achieving an integrated capability.

  3. MATLAB/Simulink Framework for Modeling Complex Coolant Flow Configurations of Advanced Automotive Thermal Management Systems

    SciTech Connect

    Titov, Gene; Lustbader, Jason; Leighton, Daniel; Kiss, Tibor

    2016-04-05

    The National Renewable Energy Laboratory's (NREL's) CoolSim MATLAB/Simulink modeling framework was extended by including a newly developed coolant loop solution method aimed at reducing the simulation effort for arbitrarily complex thermal management systems. The new approach does not require the user to identify specific coolant loops and their flow. The user only needs to connect the fluid network elements in a manner consistent with the desired schematic. Using the new solution method, a model of NREL's advanced combined coolant loop system for electric vehicles was created that reflected the test system architecture. This system was built using components provided by the MAHLE Group and included both air conditioning and heat pump modes. Validation with test bench data and verification with the previous solution method were performed for 10 operating points spanning a range of ambient temperatures between -2 degrees C and 43 degrees C. The largest root mean square difference between pressure, temperature, energy and mass flow rate data and simulation results was less than 7%.

  4. Tailoring Green Infrastructure Implementation Scenarios based on Stormwater Management Objectives

    EPA Science Inventory

    Green infrastructure (GI) refers to stormwater management practices that mimic nature by soaking up, storing, and controlling onsite. GI practices can contribute reckonable benefits towards meeting stormwater management objectives, such as runoff peak shaving, volume reduction, f...

  5. Implementing a Nurse Manager Profile to Improve Unit Performance.

    PubMed

    Krugman, Mary E; Sanders, Carolyn L

    2016-06-01

    Nurse managers face significant pressures in the rapidly changing healthcare environment. Staying current with multiple sources of data, including reports that detail institutional and unit performance outcomes, is particularly challenging. A Nurse Manager Customized Profile was developed at a western academic hospital to provide a 1-page visual of pertinent data to help managers and director supervisors focus coaching to improve unit performance. Use of the Decisional Involvement Scale provided new insights into measuring manager performance.

  6. Using an Innovation Configuration Component Map To Assess the Relationship between Student Achievement and the Degree of Implementation of Extended School Services in a Sample of Kentucky Middle Schools.

    ERIC Educational Resources Information Center

    Craig, James R.; Kacer, Barbara A.

    One of the diagnostic tools used in the evaluation of programs implemented under the Kentucky Education Reform Act (KERA) (1990) is the Innovation Configuration Component (ICC) Map, designed to specify the key elements associated with an innovation and to define what "use" means in the context of implementing an innovation. This study…

  7. Unterstützung der IT-Service-Management-Prozesse an der Technischen Universität München durch eine Configuration-Management-Database

    NASA Astrophysics Data System (ADS)

    Knittl, Silvia

    Hochschulprozesse in Lehre und Verwaltung erfordern durch die steigende Integration und IT-Unterstützung ein sogenanntes Business Alignment der IT und damit auch ein professionelleres IT-Service-Management (ITSM). Die IT Infrastructure Library (ITIL) mit ihrer Beschreibung von in der Praxis bewährten Prozessen hat sich zum de-facto Standard im ITSM etabliert. Ein solcher Prozess ist das Konfigurationsmanagement. Es bildet die IT-Infrastruktur als Konfigurationselemente und deren Beziehungen in einem Werkzeug, genannt Configuration Management Database (CMDB), ab und unterstützt so das ITSM. Dieser Bericht beschreibt die Erfahrungen mit der prototypischen Einführung einer CMDB an der Technischen Universität München.

  8. Crisis crowdsourcing framework: designing strategic configurations of crowdsourcing for the emergency management domain

    USGS Publications Warehouse

    Liu, Sophia B.

    2014-01-01

    Crowdsourcing is not a new practice but it is a concept that has gained significant attention during recent disasters. Drawing from previous work in the crisis informatics, disaster sociology, and computer-supported cooperative work (CSCW) literature, the paper first explains recent conceptualizations of crowdsourcing and how crowdsourcing is a way of leveraging disaster convergence. The CSCW concept of “articulation work” is introduced as an interpretive frame for extracting the salient dimensions of “crisis crowdsourcing.” Then, a series of vignettes are presented to illustrate the evolution of crisis crowdsourcing that spontaneously emerged after the 2010 Haiti earthquake and evolved to more established forms of public engagement during crises. The best practices extracted from the vignettes clarified the efforts to formalize crisis crowdsourcing through the development of innovative interfaces designed to support the articulation work needed to facilitate spontaneous volunteer efforts. Extracting these best practices led to the development of a conceptual framework that unpacks the key dimensions of crisis crowdsourcing. The Crisis Crowdsourcing Framework is a systematic, problem-driven approach to determining the why, who, what, when, where, and how aspects of a crowdsourcing system. The framework also draws attention to the social, technological, organizational, and policy (STOP) interfaces that need to be designed to manage the articulation work involved with reducing the complexity of coordinating across these key dimensions. An example of how to apply the framework to design a crowdsourcing system is offered with with a discussion on the implications for applying this framework as well as the limitations of this framework. Innovation is occurring at the social, technological, organizational, and policy interfaces enabling crowdsourcing to be operationalized and integrated into official products and services.

  9. Generating and Implementing School Based Management of Program Development.

    ERIC Educational Resources Information Center

    Moeller, Jean

    Described are the efforts of generating and implementing a generic model for program development at a kindergarten through sixth-grade elementary school in order to satisfy identified needs for program improvements in science. The implementation of the program involved a steering committee, the teaching staff, community members and external…

  10. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  11. Operational Dynamic Configuration Analysis

    NASA Technical Reports Server (NTRS)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  12. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  13. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... resource management guide, as well as the overall content of the guide, shall be provided by the... Management Guide B Exhibit B to Subpart G of Part 1940 Agriculture Regulations of the Department of... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural...

  14. Implementation of the Human Talent Management through Competencies Model in a University in Metropolitan Lima

    ERIC Educational Resources Information Center

    Rodríguez, Juan C.

    2015-01-01

    This article is a work proposal that aims to describe the methodology proposed by the Management of Personnel Management from a university in Lima, to implement a management model based on competencies which traceability involves various technical HR processes practiced in the organization and is aligned to institutional outcomes defined in the…

  15. Implementing Quality Management in the University: The Role of Leadership in Finnish Universities

    ERIC Educational Resources Information Center

    Anyamele, Stephen Chukwu

    2005-01-01

    This paper investigates how university leaders in Finland implement quality management in their respective institutions. The study uses a modified model of the European Foundation for Quality Management (EFQM) Excellence Model as a theoretical base in eliciting information on quality management strategies from the senior academic leaders in these…

  16. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  17. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  18. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  19. The Implementation of an Office Systems Management Curriculum for the 1980s.

    ERIC Educational Resources Information Center

    Stallard, John J.

    1982-01-01

    Describes the implementation of an office systems management curriculum (at the University of Tennessee, Knoxville) that trains students to develop their conceptual skills and to train for management-level positions. Courses involve the automated office, records systems, office systems analysis, case studies, and management information systems.…

  20. Self-Managed Work Teams in Nursing Homes: Implementing and Empowering Nurse Aide Teams

    ERIC Educational Resources Information Center

    Yeatts, Dale E.; Cready, Cynthia; Ray, Beth; DeWitt, Amy; Queen, Courtney

    2004-01-01

    Purpose: This article describes the progress of our study to examine the advantages and costs of using self-managed nurse aide teams in nursing homes, steps that are being taken to implement such teams, and management strategies being used to manage the teams. Design and Methods: A quasi-experimental design is underway where certified nurse aide…

  1. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided...

  2. Total Quality Management Guide. Volume 2. A Guide to Implementation

    DTIC Science & Technology

    1990-02-15

    in tiffl Cttn anid stod FIG. S-3. WORKFLOW DIAGIIAM B - Appendix B: Seven Basic Graphic Tools PARETO CHARTS In the late 1800s, Vilfredo Pareto , an...Opportunities. NOU Graph Pareto Chart 2. Prioritize & Select Improvement Opportunities Fishbane Diagram Pareto Chart 3. Analyze Root Causes Solution...Selectlor, Matrix Barriers and Aids 4. Select Solution Trial Impltementation Pareto , Chart Graph 5. Conduct Trial- Implementation Implementation

  3. Implementing Total Quality Management: A Model for Research Libraries.

    ERIC Educational Resources Information Center

    Barnard, Susan B.

    1993-01-01

    Describes a model of Total Quality Management (TQM) developed by the Association of Research Libraries. The issues, elements and processes of a comprehensive TQM-based transition, including commitment by management, linkage to organizational strategic planning, organizational culture, understanding customers, and quality teams are covered.…

  4. Implementing Socrates Knowledge Management System for Education and Training.

    ERIC Educational Resources Information Center

    Shrivastava, Paul

    This paper develops a new conception of organizational knowledge management as "knowledge ecology." The Socrates electronic learning environment is described as an example of a knowledge ecosystem for education and training. The Socrates program was developed as a knowledge management system, viewing classrooms as organizations for…

  5. Implementing Total Quality Management in the School: Challenges and Opportunity.

    ERIC Educational Resources Information Center

    Murgatroyd, Stephen

    1993-01-01

    Total Quality Management (TQM) is not another"add-on" but a wholly reconceived approach to managing educational institutions. Some common start-up problems are lack of feasible leadership commitment, poor data and deployment plans, and inadequate managerial skills. Postlaunch problems include team and measurement mania, overzealous selling of…

  6. Practical applications approach to design, development and implementation of an integrated management system.

    PubMed

    Holdsworth, Rodger

    2003-11-14

    The introduction of quality, risk, safety, health and environmental management philosophies has significantly changed industry's view of company organization and controlling processes. Quality, risk, safety, health and environmental programs and systems, such as ISO 9000, ISO 14000, process safety, and risk management are impacting the way industry will meet the challenges of safety and environmental risks and the needs of the customer in the future.A wealth of knowledge has been extracted from practical application case studies, which would otherwise be unobtainable without years of experience related to management systems design, development, implementation and control. This paper discusses a practical applications approach to design, develop and implement an integrated management system encompassing quality (ISO 9000), process safety management (CFR 29 1910.119), risk management programs (CFR 40 part 68), environmental management (ISO 14000), and safety and health. This paper includes a discussion of management systems integration and an overview of management systems standards that apply to the petrochemical and chemical manufacturers industries. The paper also provides an overview on integrating management systems, including issues related to the following topics: Establishing a management system team and objectives. Assessing and knowing your organization. Designing the management system to meet site objectives. Developing system documentation. Implementing effective management systems. Measuring program performance. Continuous improvement.

  7. An Implementation Strategy of Evidence-Based Application Lifecycle Management

    NASA Astrophysics Data System (ADS)

    Kim, Jeong Ah; Choi, Seungyong

    Application lifecycle management (ALM) facilitate and integrate facilitate and integrate requirements management, architecture, coding, testing, tracking, and release management. Process automation and seamless traceability among tools are getting important. In this paper, we suggest new approach to achieve the seamless traceability and process automation. For these features, knowledge formalization is critical. Evidence-based medicine is good reference architecture to ALM2. Software Engineering ontology is powerful solution to semantic gap between tools and guideline-based process execution environment can be practical solution to process automation.

  8. KBSA Configuration Manager.

    DTIC Science & Technology

    1995-02-01

    Harvard University to support a new language for parallel machines. Part of the work on this contract involved developing a new graphical editor for activity descriptions. This editor has the property of being programmable using a combination of EMACS Lisp and Post

  9. Change Management – Recommendations for Successful Electronic Medical Records Implementation

    PubMed Central

    Shoolin, J.S.

    2010-01-01

    Summary Change is difficult and managing change even more so. With the advent of Electronic Medical Records (EMRs) and the difficulty of its acceptance, understanding physician’s attitudes and the psychology of change management is imperative. While many authors describe change management theories, one comes nearest to describing this particularly difficult transition. In 1969, Elizabeth Kübler-Ross wrote her seminal treatise, On Death and Dying, detailing the psychological changes terminally ill patients undergo. Her grieving model is a template to examine the impact of change. By following a physician through the EMR maze, understanding the difficulties he/she perceives and developing a plan other change agents are able to use, the paper gives practical recommendations to EMR change management. PMID:23616842

  10. Aircraft Configuration and Flight Crew Compliance with Procedures While Conducting Flight Deck Based Interval Management (FIM) Operations

    NASA Technical Reports Server (NTRS)

    Shay, Rick; Swieringa, Kurt A.; Baxley, Brian T.

    2012-01-01

    Flight deck based Interval Management (FIM) applications using ADS-B are being developed to improve both the safety and capacity of the National Airspace System (NAS). FIM is expected to improve the safety and efficiency of the NAS by giving pilots the technology and procedures to precisely achieve an interval behind the preceding aircraft by a specific point. Concurrently but independently, Optimized Profile Descents (OPD) are being developed to help reduce fuel consumption and noise, however, the range of speeds available when flying an OPD results in a decrease in the delivery precision of aircraft to the runway. This requires the addition of a spacing buffer between aircraft, reducing system throughput. FIM addresses this problem by providing pilots with speed guidance to achieve a precise interval behind another aircraft, even while flying optimized descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR) human-in-the-loop experiment employed 24 commercial pilots to explore the use of FIM equipment to conduct spacing operations behind two aircraft arriving to parallel runways, while flying an OPD during high-density operations. This paper describes the impact of variations in pilot operations; in particular configuring the aircraft, their compliance with FIM operating procedures, and their response to changes of the FIM speed. An example of the displayed FIM speeds used incorrectly by a pilot is also discussed. Finally, this paper examines the relationship between achieving airline operational goals for individual aircraft and the need for ATC to deliver aircraft to the runway with greater precision. The results show that aircraft can fly an OPD and conduct FIM operations to dependent parallel runways, enabling operational goals to be achieved efficiently while maintaining system throughput.

  11. Interval Management: Development and Implementation of an Airborne Spacing Concept

    NASA Technical Reports Server (NTRS)

    Barmore, Bryan E.; Penhallegon, William J.; Weitz, Lesley A.; Bone, Randall S.; Levitt, Ian; Flores Kriegsfeld, Julia A.; Arbuckle, Doug; Johnson, William C.

    2016-01-01

    Interval Management is a suite of ADS-B-enabled applications that allows the air traffic controller to instruct a flight crew to achieve and maintain a desired spacing relative to another aircraft. The flight crew, assisted by automation, manages the speed of their aircraft to deliver more precise inter-aircraft spacing than is otherwise possible, which increases traffic throughput at the same or higher levels of safety. Interval Management has evolved from a long history of research and is now seen as a core NextGen capability. With avionics standards recently published, completion of an Investment Analysis Readiness Decision by the FAA, and multiple flight tests planned, Interval Management will soon be part of everyday use in the National Airspace System. Second generation, Advanced Interval Management capabilities are being planned to provide a wider range of operations and improved performance and benefits. This paper briefly reviews the evolution of Interval Management and describes current development and deployment plans. It also reviews concepts under development as the next generation of applications.

  12. Final Environmental Assessment: Implementation of the Natural Resources Management Program Clear Air Force Station, Alaska

    DTIC Science & Technology

    2003-06-01

    medium and high intensity management levels for the INRMP. No significant impacts were identified in the EA. 15. SUBJECT TERMS 16. SECURITY...Proposed Action would implement a combination of medium and high intensity management levels for the INRMP. No significant impacts were identified in the...the management intensity level that would allow for the effective ecosystem management of Clear AFS lands, (2) continue with mission support for

  13. Constraints to Senior Management's Capacity to Implement the Performance Management System in Senior Secondary Schools in Botswana

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2013-01-01

    The performance management system in different forms has been in existence in many countries for some years. In 1999 Botswana like other countries decided to implement a performance management system (PMS) across the entire public service including schools. At its introduction, the government explained the purpose for which this reform was being…

  14. Implementing Change: A Guide for the DOD Functional Manager

    DTIC Science & Technology

    1993-09-01

    MONITORING AND EVALUATION STRATEGY .. ..... 37 1. Approaches to...answered by developing a plan and establishing a structure that monitors and evaluates the changes. B. MONITORING AND EVALUATION STRATEGYL Monitoring and evaluation can...other hand, constant monitoring and evaluation during the implementation process may catch mistakes before it is too late, and changes can be ma le

  15. Implementing and Managing Change: A Guide for Assessing Information Technology.

    ERIC Educational Resources Information Center

    Morell, Jonathan A.; And Others

    A framework for assessing the implementation and impact of office automation (OA) technology within shore-based facilities of the U.S. Navy is provided. Following a list of the assumptions guiding the evaluation plan, a model for data collection is presented which is based on the perspective of a work group, i.e., a small number of individuals who…

  16. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  17. Detailed requirements document for Stowage List and Hardware Tracking System (SLAHTS). [computer based information management system in support of space shuttle orbiter stowage configuration

    NASA Technical Reports Server (NTRS)

    Keltner, D. J.

    1975-01-01

    The stowage list and hardware tracking system, a computer based information management system, used in support of the space shuttle orbiter stowage configuration and the Johnson Space Center hardware tracking is described. The input, processing, and output requirements that serve as a baseline for system development are defined.

  18. The design and implementation of hydrographical information management system (HIMS)

    NASA Astrophysics Data System (ADS)

    Sui, Haigang; Hua, Li; Wang, Qi; Zhang, Anming

    2005-10-01

    With the development of hydrographical work and information techniques, the large variety of hydrographical information including electronic charts, documents and other materials are widely used, and the traditional management mode and techniques are unsuitable for the development of the Chinese Marine Safety Administration Bureau (CMSAB). How to manage all kinds of hydrographical information has become an important and urgent problem. A lot of advanced techniques including GIS, RS, spatial database management and VR techniques are introduced for solving these problems. Some design principles and key techniques of the HIMS including the mixed mode base on B/S, C/S and stand-alone computer mode, multi-source & multi-scale data organization and management, multi-source data integration and diverse visualization of digital chart, efficient security control strategies are illustrated in detail. Based on the above ideas and strategies, an integrated system named Hydrographical Information Management System (HIMS) was developed. And the HIMS has been applied in the Shanghai Marine Safety Administration Bureau and obtained good evaluation.

  19. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  20. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Responsibilities § 1220.32 What records management principles must agencies implement? Agencies must create and...) Records, regardless of format, are protected in a safe and secure environment and removal or...

  1. 36 CFR 1220.32 - What records management principles must agencies implement?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Responsibilities § 1220.32 What records management principles must agencies implement? Agencies must create and...) Records, regardless of format, are protected in a safe and secure environment and removal or...

  2. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  3. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution...

  4. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  5. HEALTH CARE GUIDE TO POLLUTION PREVENTION IMPLEMENTATION THROUGH ENVIRONMENTAL MANAGEMENT SYSTEMS

    EPA Science Inventory

    The Health Care Guide to Pollution Prevention Implementation through Environmental Management Systems provides example EMS procedures and forms used in four ISO 14001 EMS certified hospitals. The latest revisions include more EMS hospital case studies, more compliance resources, ...

  6. Illustrating the multiple facets and levels of fidelity of implementation to a teacher classroom management intervention.

    PubMed

    Reinke, Wendy M; Herman, Keith C; Stormont, Melissa; Newcomer, Lori; David, Kimberly

    2013-11-01

    Many school-based interventions to promote student mental health rely on teachers as implementers. Thus, understanding the interplay between the multiple domains of fidelity to the intervention and intervention support systems such as coaching and teacher implementation of new skills is an important aspect of implementation science. This study describes a systematic process for assessing multiple domains of fidelity. Data from a larger efficacy trial of the Incredible Years Teacher Classroom Management (IY TCM) program are utilized. Data on fidelity to the IY TCM workshop training sessions and onsite weekly coaching indicate that workshop leaders and the IY TCM coach implemented the training and coaching model with adequate adherence. Further, workshop leaders' ratings of engagement were associated with teacher implementation of specific praise, following training on this content. Lastly, the IY TCM coach differentiation of teacher exposure to coaching was evaluated and found to be associated with teacher implementation of classroom management practices and student disruptive behavior.

  7. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  8. Theory into practice: implementing ecosystem management objectives in the USDA Forest Service.

    PubMed

    Butler, Kelly F; Koontz, Tomas M

    2005-02-01

    In the United States and around the world, scientists and practitioners have debated the definition and merits of ecosystem management as a new approach to natural resource management. While these debates continue, a growing number of organizations formally have adopted ecosystem management. However, adoption does not necessarily lead to successful implementation, and theories are not always put into practice. In this article, we examine how a leading natural resource agency, the United States Department of Agriculture Forest Service, has translated ecosystem management theory into concrete policy objectives and how successfully these objectives are perceived to be implemented throughout the national forest system. Through document analysis, interviews, and survey responses from 345 Forest Service managers (district rangers, forest supervisors, and regional foresters), we find that the agency has incorporated numerous ecosystem management components into its objectives. Agency managers perceive that the greatest attainment of such objectives is related to collaborative stewardship and integration of scientific information, areas in which the organization has considerable prior experience. The objectives perceived to be least attained are adaptive management and integration of social and economic information, areas requiring substantial new resources and a knowledge base not traditionally emphasized by natural resource managers. Overall, success in implementing ecosystem management objectives is linked to committed forest managers.

  9. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... Air Quality Management District regarding specific implementation of parts of the Prevention of Significant Deterioration program. (i) Incorporation by reference. (A) South Coast Air Quality...

  10. Implementing an Open Source Learning Management System: A Critical Analysis of Change Strategies

    ERIC Educational Resources Information Center

    Uys, Philip M.

    2010-01-01

    This paper analyses the change and innovation strategies that Charles Sturt University (CSU) used from 2007 to 2009 during the implementation and mainstreaming of an open source learning management system (LMS), Sakai, named locally as "CSU Interact". CSU was in January 2008 the first Australian University to implement an open source…

  11. Implementation and Adaptation Experiences with a WWW-Based Course Management System.

    ERIC Educational Resources Information Center

    de Boer, Wim; Collis, Betty

    2001-01-01

    Discusses use of the World Wide Web (WWW) for course management at the University of Twente (Netherlands) and describes the TeleTOP Implementation Model that delineates the change entities that are of importance when an institution plans to implement the World Wide Web in education on a wide scale. (LRW)

  12. Some Issues in Implementing Library Self-Checkout Systems: A Management Perspective.

    ERIC Educational Resources Information Center

    DeJoice, Mary Jo; Sennyey, Pongracz

    2000-01-01

    Considers how the implementation of self-checkout systems may affect library management in general and circulation departments in particular, focusing on the impact on circulation departments' workflow and the financial implications involved in implementing it. Suggests an opportunity for libraries to undergo a paradigm shift concerning the…

  13. 7 CFR Exhibit B to Subpart G of... - Development and Implementation of Natural Resource Management Guide

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Development and Implementation of Natural Resource... Implementation of Natural Resource Management Guide 1. The State Director shall complete the natural resource... and the fulfillment of the requirements of paragraph 4. of this exhibit, the natural...

  14. 76 FR 7500 - Indian Trust Management Reform-Implementation of Statutory Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-10

    ... Trust Management Reform--Implementation of Statutory Changes AGENCY: Bureau of Indian Affairs, Office of... final rule implements the latest statutory changes to the Indian Land Consolidation Act, as amended by the 2004 American Indian Probate Reform Act and later amendments (ILCA/AIPRA). These changes...

  15. 76 FR 45198 - Indian Trust Management Reform-Implementation of Statutory Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... Trust Management Reform--Implementation of Statutory Changes AGENCY: Bureau of Indian Affairs, Office of... interim final rule published and effective on February 10, 2011, to implement the latest statutory changes.... The Department did not receive any adverse comments, and therefore confirms the rule without...

  16. Implementation of an Integrated Information Management System at the National Library of Wales: A Case Study

    ERIC Educational Resources Information Center

    Evans, Manon Foster; Thomas, Sian

    2007-01-01

    Purpose: This paper aims to describe the experiences of the National Library of Wales in implementing an integrated information management system. Design/methodology/approach: Discusses the stages involved in the procurement process, data migration and general system implementation. Findings: Emphasises the need for a well-prepared yet flexible…

  17. HAMMER COURSEWARE MANAGEMENT SYSTEM (CMS) SYSTEM DEVELOPMENT & IMPLEMENTATION

    SciTech Connect

    GARDNER, P.R.

    2006-04-28

    HAMMER Courseware Management System (HAMMERCMS) is the official name of the system Fluor Hanford, Inc., uses to facilitate development of, deliver, and track training presented in some electronic form (mainly, web-based training) to Hanford Site employees, subcontractors, and vendors.

  18. Implementing Integrated Multicultural Instructional Design in Management Education

    ERIC Educational Resources Information Center

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  19. Scope Management: A Core Information System Implementation Project Pedagogy

    ERIC Educational Resources Information Center

    Léger, Pierre-Majorique; Lyle, Derick; Babin, Gilbert; Charland, Patrick; Pellerin, Robert

    2013-01-01

    This article describes an initiative to provide IS management a capstone course that builds on the zone of proximal development concept, oriented towards developing prioritization and critical reasoning skills, and to promote self-learning. Request for proposal business cases appear to offer effective mechanisms for retaining context, while…

  20. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    ERIC Educational Resources Information Center

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  1. Agricultural drainage water management: Potential impact and implementation strategies

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The unique soil and climate of the Upper Mississippi River Basin (and the Lake Erie Basin) area provide the resources for bountiful agricultural production. Agricultural drainage (both surface and subsurface drainage) is essential for achieving economically viable crop production and management. Dra...

  2. Towards an Effective Management Strategy for Passive RFID Implementation

    DTIC Science & Technology

    2004-08-01

    Status - Inbound Shipment Information -Inventory Management Information - Inbound Shipment Information-Tagged Materiel -Tagged Materiel -Tagged Materiel...Tagged Materiel D el iv er ed O rd er -Shipment Status - Inbound Shipment Information -Tagged Materiel -Consolidated Shipment information-Outbound...Shipment Information -Tagged Materiel -Shipment Status - Inbound Shipment Information Theater Distribution Center Transportation/ Supply Office DoD

  3. Performance Management in UK Universities: Implementing the Balanced Scorecard

    ERIC Educational Resources Information Center

    Taylor, John; Baines, Claire

    2012-01-01

    In recent years, UK universities have become increasingly concerned with performance management. This trend reflects both growing competition and marketisation within higher education, and the increasing requirements for accountability. In response, institutions have begun to explore the application of formal methodologies for performance…

  4. Implementing Parent Management Training in the Context of Poverty.

    ERIC Educational Resources Information Center

    Eamon, Mary Keegan; Venkataraman, Meenakshi

    2003-01-01

    Parent management training (PMT) is a well-investigated, effective, and preferred treatment for children's externalizing behaviors and related disorders. This article explores why, unfortunately, PMT is not as effective for children living in poor families, who disproportionately exhibit the behaviors that PMT is designed to correct. (Contains 40…

  5. The Implementation of Mock Negotiations in Teaching International Business Management.

    ERIC Educational Resources Information Center

    Raffield, Barney T., III

    Mock negotiations are used as part of an undergraduate course in international business management at Lebanon Valley College (Pennsylvania) in order to introduce students to the process of negotiating for advantage in foreign countries and to emphasize the importance of an individual nation's customs, culture, and ways of transacting business in…

  6. Digital Rights Management Implemented by RDF Graph Approach

    ERIC Educational Resources Information Center

    Yang, Jin Tan; Horng, Huai-Chien

    2006-01-01

    This paper proposes a design framework for constructing Digital Rights Management (DRM) that enables learning objects in legal usage. The central theme of this framework is that any design of a DRM must have theories as foundations to make the maintenance, extension or interoperability easy. While a learning objective consists of learning…

  7. An SSM-Based Approach to Implement a Dynamic Performance Management System

    NASA Astrophysics Data System (ADS)

    da Piedade Francisco, Roberto; Azevedo, Américo

    This paper underlines how the use of Soft Systems Methodology (SSM) for an efficient planning, implementation and monitoring of a dynamic performance management system supported by a conceptual scheme that enables a conscious and prepared implementation, can provide instances of performance of a collaborative network, and also promote alignment among the partners. A systematic way to implement it and a review on two practical applications in Brazilian collaborative networks of SMEs are also presented.

  8. A Management Case Study: The Implementation of the Rapid Acquisition of Manufactured Parts (RAMP) Program

    DTIC Science & Technology

    1993-06-01

    manufacturing needs based on the dollars available to support this new technology. In December 1987, the staif at NAVSUP awarded the current RAMP contract to...describes the implementation of the Navy’s Rapid Acquisition of Manufactured Parts (RAMP) program. The RAMP program was implemented in 1989 by the Naval...time and cost for manufactured spare parts. This management case study concentrates on the examination of how new technology is implemented into current

  9. Implementation of data management and analysis system for marine ranching

    NASA Astrophysics Data System (ADS)

    Jiang, Xiaopeng; Gao, Zhiqiang; Shang, Weitao; Liu, Chaoshun; Sun, ZhiBin

    2016-09-01

    Marine environment protection is an important support for sustainable development of marine ranching. Based on the geographic information system(GIS) and remote sensing(RS), this study developed a 3S system, which integrate Sea surface temperature, chlorophyll concentration, turbidity of sea water and other factors into system. And these factors are important components of marine environment. The system provided data service including loading, browsing, information inquiry, cartography, and also supported the analysis of remote sensing image. In the implementation of the system, the key points of the related technologies have been paid much attention. The practical application shows that it can provide assistance for the environmental protection of marine ranching.

  10. Transition management - An analysis of strategic considerations for effective implementation

    NASA Technical Reports Server (NTRS)

    Hunsucker, John L.; Loos, David

    1989-01-01

    Six managerial guidelines are identified for facilitating successful change in an organization. They are: (1) the need for a catalyst to initiate change; (2) the setting of organizational goals which take into account the impact of technical, political, and cultural factors; (3) requiring a transition team to guide the change; (4) a demonstration by top management of a commitment to the change as well as their acting as change agents; (5) the utilization of employee participation and good communication to help overcome employee resistance; and (6) the evaluation of the change program as important to the success of present and future change programs. A description of each guideline is presented, and its importance is examined. Available options are also presented for management to deal with each of the guidelines.

  11. Design and Implementation of a Multimedia DBMS. Retrieval Management

    DTIC Science & Technology

    1990-09-01

    in order to retrieve the data, we have to first build temporary database tables for further processing . Chapter II in this thesis will discuss the...work done in this thesis . To process a single select statement in SQL involving media data, the query must be decomposed into subqueries. Temporary...DBMS Retrieval Management by Pongsuwan, Wuttipong September, 1990 Thesis Advisor: Vincent Y’. Luin Approved for public release; distribution is

  12. A graded approach to ISO 9000 implementation for records managers

    SciTech Connect

    Pasterczyk, C.E.

    1994-08-01

    ISO 9000 is a series of quality system standards developed by Technical Committee 176 of the International Standards Organization. The series includes three standards, ISO 9001 `Quality systems--Model for quality assurance in design/development, production, installation and serving,` ISO 9002 `Quality systems--Model for quality assurance in production and installation,` ISO 9003 `Quality systems--Model for quality assurance in final inspection and test,` and two guidelines, ISO 9000 `Quality management and quality assurance standards` and ISO 9004 `Quality management and quality system elements--Guidelines.` In companies with quality programs already in place, the structure of the ISO series lends itself to augmenting those policies, procedures, and instructions where problems exist or where the risks of failure are greater. The objectives of this paper are to provide a basic familiarity to ISO 9000 and quality assurance concepts; provide a higher level of familiarity to the records management and document control portions of the ISO 9000 series; and to discuss a graded approach to meeting the intent of ISO 9000.

  13. Total quality management: Strengths and barriers to implementation and cultural adaptation

    NASA Technical Reports Server (NTRS)

    Siegfeldt, Denise V.; Glenn, Michael; Hamilton, Louise

    1992-01-01

    NASA/Langley Research Center (LaRC) is in the process of implementing Total Quality Management (TQM) throughout the organization in order to improve productivity and make the Center an even better place to work. The purpose of this project was to determine strengths and barriers to TQM being implemented and becoming a part of the organizational culture of the Human Resources Management Division (HRMD) at Langley. The target population for this project was both supervisory and nonsupervisory staff of the HMRD. In order to generate data on strengths and barriers to TQM implementation and cultural adaptation, a modified nominal group technique was used.

  14. A Solution for Establishing the Information Technology Service Management Processes Implementation Sequence

    NASA Astrophysics Data System (ADS)

    Arcilla, Magdalena; Calvo-Manzano, Jose; Cuevas, Gonzalo; Gómez, Gerzon; Ruiz, Elena; San Feliu, Tomás

    This paper addresses the implementation sequence of Services Management processes defined in ITIL v2, from a topological perspective. Graphs Theory is used to represent the existing dependencies among the ITIL v2 processes, in order to find clusters of strongly connected processes. These clusters will help to determine the implementation priority of the service management processes. For it, OPreSSD (Organizational Procedure for Service Support and Service Delivery) is proposed in order to identify the processes implementation sequence related to the Service Support (SS) and Service Delivery (SD) areas.

  15. Design and Implementation of Training to Improve Management of Pediatric Overweight

    ERIC Educational Resources Information Center

    Beno, Luke; Hinchman, Josephine; Kibbe, Debra; Trowbridge, Frederick

    2005-01-01

    Introduction: Clinicians report a low proficiency in treating overweight children and using behavioral management strategies. This paper documents the design and implementation of a training program to improve clinicians' skills in the assessment and behavioral management of pediatric overweight. Methods: Two one-hour CME trainings were designed…

  16. Effects of a Tier 3 Self-Management Intervention Implemented with and without Treatment Integrity

    ERIC Educational Resources Information Center

    Lower, Ashley; Young, K. Richard; Christensen, Lynnette; Caldarella, Paul; Williams, Leslie; Wills, Howard

    2016-01-01

    This study investigated the effects of a Tier 3 peer-matching self-management intervention on two elementary school students who had previously been less responsive to Tier 1 and Tier 2 interventions. The Tier 3 self-management intervention, which was implemented in the general education classrooms, included daily electronic communication between…

  17. Strategies Nurse Managers Used to Offset Challenges during Electronic Medical Records Implementation: A Case Study

    ERIC Educational Resources Information Center

    Easterling, Latasha

    2015-01-01

    The purpose of this qualitative, descriptive case study was to discover successful approaches used, by nurse managers, to reduce barriers during the implementation of electronic medical record system in one hospital. Fourteen nurse managers were interviewed from an academic health science center in Mississippi. A pilot study was conducted to…

  18. Implementation of retrofit best management practices in a suburban watershed (Cincinnati OH) via economic incentives

    EPA Science Inventory

    There is great potential for managing stormwater runoff quantity; however, implementation in already-developed areas remains a challenge. We assess the viability of economic incentives to place best management practices (BMPs) on parcels in a 1.8 km2 suburban watershed near Cinci...

  19. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  20. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air...

  1. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  3. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  4. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  5. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  6. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  7. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  8. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  9. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  10. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  11. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on June... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  12. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve a revision to the South Coast Air Quality Management...

  13. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  14. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  17. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  18. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  19. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  20. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  1. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  3. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  4. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... AGENCY 40 CFR Part 52 Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing disapproval of a revision to the South Coast Air Quality Management District (SCAQMD) portion...

  5. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  6. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  7. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  8. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  9. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  10. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  11. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  12. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  13. Implementing a New Cloud Computing Library Management Service: A Symbiotic Approach

    ERIC Educational Resources Information Center

    Dula, Michael; Jacobsen, Lynne; Ferguson, Tyler; Ross, Rob

    2012-01-01

    This article presents the story of how Pepperdine University migrated its library management functions to the cloud using what is now known as OCLC's WorldShare Management Services (WMS). The story of implementing this new service is told from two vantage points: (1) that of the library; and (2) that of the service provider. The authors were the…

  14. Implementation of a Self-Management System for Students with Disabilities in General Education Settings

    ERIC Educational Resources Information Center

    Schulze, Margaret A.

    2016-01-01

    Despite the fact that self-management procedures have a robust literature base attesting to their efficacy with students with disabilities, the use of these strategies in general education settings remains limited. This mixed methods study examined the implementation of self-management procedures using both quantitative and qualitative methods.…

  15. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  16. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... 2012-0033, Sequence 1] RIN 9000-AM51 Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation AGENCY: Department of Defense (DoD), General Services Administration (GSA... (ORCA), and Excluded Parties List System (EPLS) databases into the System for Award Management...

  17. Overcoming constraints to the implementation of water demand management in southern Africa

    NASA Astrophysics Data System (ADS)

    Mwendera, E. J.; Hazelton, D.; Nkhuwa, D.; Robinson, P.; Tjijenda, K.; Chavula, G.

    This paper presents results of a study on water demand management status and overcoming constraints to implementation of water demand management in the southern African region, as part of Phase II of water demand management (WDM) programme implemented by the IUCN (The World Conservation Union). The study was conducted in Malawi, Namibia, South Africa, Swaziland, Zambia and Zimbabwe. The study methodology consisted of a survey of literature, and interviewing and communicating with stakeholders in order to learn from stakeholders on the critical constraints to WDM implementation and strategies to overcome them. The study has shown that, despite the potential savings that would accrue from implementation of WDM, the water sector across the southern African region continues to focus on water supply augmentation. There are inadequate financial and human resources for rehabilitation, operation and maintenance of water conveyance systems resulting in system leaks, which contribute to high levels of unaccounted-for water, a situation that masks the potential benefits of WDM. In most countries, the water sector operates on ad-hoc sub-sector water user objectives, which provided guidelines only for development and management purposes. Most of the institutional frameworks have remained diffuse, resulting into poor performance in the sector, and into crisis management in the water resources development. Though the WDM policy in most countries is already accessible through guidelines for catchment management institutions and water supply institutions; there is a lack of broad commitment to implementing them. In other countries the instruments are relatively new and have not been applied widely. Similarly, the effectiveness of instruments has not been well evaluated in most countries. In countries where policy is weak there is often a lack of clarity as to who is responsible for WDM implementation, and even less clarity on who is responsible for facilitating and monitoring

  18. Pathology and failure in the design and implementation of adaptive management

    USGS Publications Warehouse

    Allen, Craig R.; Gunderson, Lance H.

    2011-01-01

    The conceptual underpinnings for adaptive management are simple; there will always be inherent uncertainty and unpredictability in the dynamics and behavior of complex ecological systems as a result non-linear interactions among components and emergence, yet management decisions must still be made. The strength of adaptive management is in the recognition and confrontation of such uncertainty. Rather than ignore uncertainty, or use it to preclude management actions, adaptive management can foster resilience and flexibility to cope with an uncertain future, and develop safe to fail management approaches that acknowledge inevitable changes and surprises. Since its initial introduction, adaptive management has been hailed as a solution to endless trial and error approaches to complex natural resource management challenges. However, its implementation has failed more often than not. It does not produce easy answers, and it is appropriate in only a subset of natural resource management problems. Clearly adaptive management has great potential when applied appropriately. Just as clearly adaptive management has seemingly failed to live up to its high expectations. Why? We outline nine pathologies and challenges that can lead to failure in adaptive management programs. We focus on general sources of failures in adaptive management, so that others can avoid these pitfalls in the future. Adaptive management can be a powerful and beneficial tool when applied correctly to appropriate management problems; the challenge is to keep the concept of adaptive management from being hijacked for inappropriate use.

  19. Aeropropulsion facilities configuration control: Procedures manual

    NASA Technical Reports Server (NTRS)

    Lavelle, James J.

    1990-01-01

    Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

  20. [Design and implementation of management system of international academic conference on biomedical engineering].

    PubMed

    Weng, Xiaohong; Guo, Xinhai; Fan, Yubo

    2009-04-01

    To meet the demands of managing international academic conferences on Biomedical Engineering, a management system was designed and implemented based on Internet. The system was aimed to implement the cooperation of different departments to manage common affair and academic papers of the conference together. In addition, it could be connected to the membership management system of Chinese Society of Biomedical Engineering. With its advanced, practical, humanized and expansible characteristics, the system performed seven main functions, including the management in general information, participant information, papers, reviewer information, booking, exhibition and manager information. The system proved to be feasible and optimized as well in the 7th Asia-Pacific Conference on Medical and Biological Engineering.

  1. Laboratory Information Management Systems--part II. Implementation.

    PubMed

    McDowall, R D; Pearce, J C; Murkitt, G S

    1988-01-01

    In this, the second of two articles on Laboratory Information Management Systems (LIMS), the stages of the acquisition of a system are discussed. First, the laboratory automation strategy is developed leading to the writing of the requirements specification sent to prospective suppliers. The next step, in conjunction with the chosen supplier, is to write the functional and systems specifications from which the LIMS will be tailored. Once installed the LIMS must be validated and in the event of hardware or software changes, should undergo partial or full re-validation. The education and training of users, and operational considerations are presented before concluding with possible developments of LIMS in the future.

  2. Implementing a computerized text-management system: an editor's view

    SciTech Connect

    Mason, J.D.

    1980-01-01

    The advent of sophisticated function-key-driven programs for handling text on a video-display terminal enables the editorial staff of a publications department to take an active role on a computerized text-management team, along with compositors and other keyboard operators. Although there are still many things that editors cannot do on a computer terminal, the bulk of manipulating straight text can be speeded, and the problems of rekeyboarding and interpretation of editorial markings can be largely bypassed. The computer also gives editors new tools that open the way for greater control over both the editorial process and the quality of technical publishing. 5 figures.

  3. Post Implementation Analysis of San Antonio Multi-Service Market Consult and Appointment Management Office (CAMO)

    DTIC Science & Technology

    2007-12-09

    COVERED (From - To) 28/12/2007 lGraduate Management Project 01/10/2005 28/12/2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Post Implementation Analysis...239.18 CAMO Analysis I Running Head: CAMO ANALYSIS Army-Baylor University Graduate Program in Health Care Administration 0 Graduate Management Project 00... Management Office in November 2004, to consolidate resources and optimize healthcare delivery. The purpose of this analysis was to develop a framework to

  4. Design and Implementation of a Multimedia DBMS: Catalog Management, Table Creation and Data Insertion

    DTIC Science & Technology

    1990-12-01

    retrieval processes is phasized and ir, [AT90] the management of sound data is described. In this thesis , the management of the catalog for the prototype...Query Processing , Master’s Thesis , Naval Postgraduate School, Department of Computer Science, Monterey, CA. (in progress) [CH86] Chrisodoulakis, S...AD-A241 761 NAVAL POSTGRADUATE SCHOOL Monterey, California r . ... ... r THESIS DESIGN AND IMPLEMENTATION OF A MULTIMEDIA DBMS: CATALOG MANAGEMENT

  5. Forrest Conservation Area : Management & Implementation FY 2004 Annual Report.

    SciTech Connect

    Smith, Brent

    2008-12-01

    The Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Conservation Area during July of 2002. The property is located in the Upper John Day subbasin within the Columbia basin. The property consists of two parcels comprising 4,232 acres. The Mainstem parcel consists of 3,445 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem John Day River. The Middle Fork parcel consists of 786 acres and is located one mile to the west of the town of Austin, OR on the Middle Fork John Day River. The Forrest Conservation Area is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. Acquisition of the Forrest Conservation Area was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by hydroelectric facilities on the Columbia River and its tributaries. The intent of the Conservation Area is to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, {section}11.1, {section}7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of management funding for the protection and restoration of fish and wildlife habitat through a memorandum of agreement.

  6. Developing an active implementation model for a chronic disease management program

    PubMed Central

    Smidth, Margrethe; Christensen, Morten Bondo; Olesen, Frede; Vedsted, Peter

    2013-01-01

    Background Introduction and diffusion of new disease management programs in healthcare is usually slow, but active theory-driven implementation seems to outperform other implementation strategies. However, we have only scarce evidence on the feasibility and real effect of such strategies in complex primary care settings where municipalities, general practitioners and hospitals should work together. The Central Denmark Region recently implemented a disease management program for chronic obstructive pulmonary disease (COPD) which presented an opportunity to test an active implementation model against the usual implementation model. The aim of the present paper is to describe the development of an active implementation model using the Medical Research Council’s model for complex interventions and the Chronic Care Model. Methods We used the Medical Research Council’s five-stage model for developing complex interventions to design an implementation model for a disease management program for COPD. First, literature on implementing change in general practice was scrutinised and empirical knowledge was assessed for suitability. In phase I, the intervention was developed; and in phases II and III, it was tested in a block- and cluster-randomised study. In phase IV, we evaluated the feasibility for others to use our active implementation model. Results The Chronic Care Model was identified as a model for designing efficient implementation elements. These elements were combined into a multifaceted intervention, and a timeline for the trial in a randomised study was decided upon in accordance with the five stages in the Medical Research Council’s model; this was captured in a PaTPlot, which allowed us to focus on the structure and the timing of the intervention. The implementation strategies identified as efficient were use of the Breakthrough Series, academic detailing, provision of patient material and meetings between providers. The active implementation model was

  7. Teaching Self-Management: The Design and Implementation of Self-Management Tutorials

    ERIC Educational Resources Information Center

    Gerhardt, Megan

    2007-01-01

    Learning the skills of self-management is an essential task for students in the 21st century. A total of 223 undergraduate students participated in 4 self-management tutorials that presented the components of understanding and mastering self-management skills including (a) self-assessment, (b) goal setting, (c) time management, and (d)…

  8. On the effectiveness in implementing a waste-management-plan method in construction.

    PubMed

    Tam, Vivian W Y

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that "Propose methods for on-site reuse of materials" and "Propose methods for reducing waste" are the main benefits gained from the implementation of the WMP method. However, "Low financial incentive" and "Increase in overhead cost" are considered as the major difficulties in the implementation. From that, "Use of prefabricated building components" is considered as the major effective measure to encourage the implementation of the WMP method.

  9. Adaptive management of river flows in Europe: A transferable framework for implementation

    NASA Astrophysics Data System (ADS)

    Summers, M. F.; Holman, I. P.; Grabowski, R. C.

    2015-12-01

    The evidence base for defining flow regimes to support healthy river ecosystems is weak, as there are few studies which quantify the ecological impact associated with different degrees of hydrological alteration. As a result, river flow standards used to manage water abstraction are largely based on expert judgement. Planned adaptive management studies on multiple rivers under the European Water Framework Directive represent an opportunity to learn about ecological flow requirements and improve the quantitative evidence base. However, identifying clear ecological responses to flow alteration can be a significant challenge, because of the complexity of river systems and the other factors which may confound the response. This paper describes the Adaptive River Management (ARM) framework, a flexible framework for implementing adaptive management of river flows that is transferable to other regions of the world. Application of the framework will ensure that the effectiveness of implemented management actions is appraised and that transferable quantitative data are collected that can be used in other geographical regions.

  10. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  11. Implementation

    EPA Pesticide Factsheets

    Describes elements for the set of activities to ensure that control strategies are put into effect and that air quality goals and standards are fulfilled, permitting programs, and additional resources related to implementation under the Clean Air Act.

  12. Syncope management unit: evolution of the concept and practice implementation.

    PubMed

    Shen, Win K; Traub, Stephen J; Decker, Wyatt W

    2013-01-01

    Syncope, a clinical syndrome, has many potential causes. The prognosis of a patient experiencing syncope varies from benign outcome to increased risk of mortality or sudden death, determined by the etiology of syncope and the presence of underlying disease. Because a definitive diagnosis often cannot be established immediately, hospital admission is frequently recommended as the "default" approach to ensure patient's safety and an expedited evaluation. Hospital care is costly while no studies have shown that clinical outcomes are improved by the in-patient practice approach. The syncope unit is an evolving practice model based on the hypothesis that a multidisciplinary team of physicians and allied staff with expertise in syncope management, working together and equipped with standard clinical tools could improve clinical outcomes. Preliminary data have demonstrated that a specialized syncope unit can improve diagnosis in a timely manner, reduce hospital admission and decrease the use of unnecessary diagnostic tests. In this review, models of syncope units in the emergency department, hospital and outpatient clinics from different practices in different countries are discussed. Similarities and differences of these syncope units are compared. Outcomes and endpoints from these studies are summarized. Developing a syncope unit with a standardized protocol applicable to most practice settings would be an ultimate goal for clinicians and investigators who have interest, expertise, and commitment to improve care for this large patient population.

  13. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  14. Implementation of an Anesthesia Information Management System in an Ambulatory Surgery Center.

    PubMed

    Mudumbai, Seshadri C

    2016-01-01

    Anesthesia information management systems (AIMS) are increasingly being implemented throughout the United States. However, little information exists on the implementation process for AIMS within ambulatory surgery centers (ASC). The objectives of this descriptive study are to document: 1) the phases of implementation of an AIMS at an ASC; and 2) lessons learnt from a socio-technical perspective. The ASC, within the Veterans Health Administration (VHA), has hosted an AIMS since 2008. As a quality improvement effort, we implemented a new version of the AIMS. This new version involved fundamental software changes to enhance clinical care such as real-time importing of laboratory data and total hardware exchange. The pre-implementation phase involved coordinated preparation over six months between multiple informatics teams along with local leadership. During this time, we conducted component, integration, and validation testing to ensure correct data flow from medical devices to AIMS and centralized databases. The implementation phase occurred in September 2014 over three days and was successful. Over the next several months, during post-implementation phase, we addressed residual items like latency of the application. Important lessons learnt from the implementation included the utility of partnering early with executive leadership; ensuring end user acceptance of new clinical workflow; continuous testing of data flow; use of a staged rollout; and providing additional personnel throughout implementation. Implementation of an AIMS at an ASC can utilize methods developed for large hospitals. However, issues unique to an ASC such as limited number of support personnel and distinctive workflows must be considered.

  15. Forrest Ranch Management and Implementation, Annual Report 2002-2003.

    SciTech Connect

    Smith, Brent

    2004-01-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  16. Institutional pressures, dynamic capabilities and environmental management systems: investigating the ISO 9000--environmental management system implementation linkage.

    PubMed

    Zhu, Qinghua; Cordeiro, James; Sarkis, Joseph

    2013-01-15

    We hypothesize a model where domestic and international institutional pressures lead to the successful implementation of ISO 9000 and can in turn lead to the successful implementation of environmental management systems such as ISO 14001 environmental certification systems or total quality environmental management (TQEM) systems. Using appropriate tests for mediation with dichotomous mediators and outcomes, we find that the model holds for a sample of 377 Chinese manufacturers in six major industrial groups in Suzhou, Dalian, and Tianjin. Our findings are consistent with the theory linking internal capabilities to heterogeneous external (in this case, institutional) pressures on organizations for environmentally proactive efforts. Our findings suggest that institutions in developing countries with significant environmental concerns such as China as well as foreign suppliers and partners to firms in these countries should encourage and support ISO 9000 implementations by local firms. These findings may influence other developing nations' adoption of quality and environmental process systems.

  17. Managerial attitude to the implementation of quality management systems in Lithuanian support treatment and nursing hospitals

    PubMed Central

    Buciuniene, Ilona; Malciankina, Sonata; Lydeka, Zigmas; Kazlauskaite, Ruta

    2006-01-01

    Background The regulations of the Quality Management System (QMS) implementation in health care organizations were approved by the Lithuanian Ministry of Health in 1998. Following the above regulations, general managers of health care organizations had to initiate the QMS implementation in hospitals. As no research on the QMS implementation has been carried out in Lithuanian support treatment and nursing hospitals since, the objective of this study is to assess its current stage from a managerial perspective. Methods A questionnaire survey of general managers of Lithuanian support treatment and nursing hospitals was carried out in the period of January through March 2005. Majority of the items included in the questionnaire were measured on a seven-point Likert scale. During the survey, a total of 72 questionnaires was distributed, out of which 58 filled-in ones were returned (response rate 80.6 per cent; standard sampling error 0.029 at 95 per cent level of confidence). Results Quality Management Systems were found operating in 39.7 per cent of support treatment and nursing hospitals and currently under implementation in 46.6 per cent of hospitals (13.7% still do not have it). The mean of the respondents' perceived QMS significance is 5.8 (on a seven-point scale). The most critical issues related to the QMS implementation include procedure development (5.5), lack of financial resources (5.4) and information (5.1), and development of work guidelines (4.6), while improved responsibility and power sharing (5.2), better service quality (5.1) and higher patient satisfaction (5.1) were perceived by the respondents as the key QMS benefits. The level of satisfaction with the QMS among the management of the surveyed hospitals is mediocre (3.6). However it was found to be higher among respondents who were more competent in quality management, were familiar with ISO 9000 standards, and had higher numbers of employees trained in quality management. Conclusion QMSs are

  18. [Computer-assisted cardiovascular disease management: better implementation of care but no improvement in clinical outcomes].

    PubMed

    de Wit, Niek J

    2012-01-01

    Computer support is considered by many to be a promising strategy for improving healthcare interventions, especially in the management of chronic diseases. So far, however, evidence of the effectiveness of ICT support in healthcare is limited. Recently, computer-supported cardiovascular disease management was compared with usual care during an RCT comprised of 1100 primary care patients. This trial demonstrated that neither the clinical outcome nor the cardiovascular morbidity rate improved, even though management of the risk factors improved over 1 year of follow-up. The pragmatic design of the RCT in daily general practice may have restricted implementing the computer support, and may also have hampered the evaluation of the cardiovascular effects. The results demonstrate that although computer support may help improve the performance of disease management, its impact on disease outcomes is questionable. ICT innovations in healthcare require rigorous investigative evaluation before their implementation in daily practice can be justified.

  19. The process of implementing an ISO 9001 quality management system in a school of nursing.

    PubMed

    Lett, M

    2000-01-01

    This paper documents the process undertaken during the establishment of an ISO 9000 series quality management system by a School of Nursing. Further discussion centres around the reasons why an ISO quality management system was implemented, the lessons learnt during the process and the benefits that accreditation has brought to the School of Nursing. The lessons learnt during the process could be of help to other organisations wishing to achieve a similar accreditation status.

  20. What roles do middle managers play in implementation of innovative practices?

    PubMed Central

    Engle, Ryann L.; Lopez, Emily R.; Gormley, Katelyn E.; Chan, Jeffrey A.; Charns, Martin P.; Lukas, Carol VanDeusen

    2017-01-01

    Background: Middle managers play key roles in hospitals as the bridge between senior leaders and frontline staff. Yet relatively little research has focused on their role in implementing new practices. Purpose: The aim of this study was to expand the understanding of middle managers’ influence in organizations by looking at their activities through the lens of two complementary conceptual frameworks. Methodology/Approach: We analyzed qualitative data from 17 Veterans Affairs Medical Centers with high and low potential to change organizational practices. We analyzed 98 interviews with staff ranging from senior leaders to frontline staff to identify themes within an a priori framework reflecting middle manager activities. Findings: Analyses yielded 14 emergent themes that allowed us to classify specific expressions of middle manager commitment to implementation of innovative practices (e.g., facilitate improvement innovation, garner staff buy-in). In comparing middle manager behaviors in high and low change potential sites, we found that most emergent themes were present in both groups. However, the activities and interactions described differed between the groups. Practice Implications: Middle managers can use the promising strategies identified by our analyses to guide and improve their effectiveness in implementing new practices. These strategies can also inform senior leaders striving to guide middle managers in those efforts. PMID:26488239

  1. Disseminating contingency management: impacts of staff training and implementation at an opiate treatment program.

    PubMed

    Hartzler, Bryan; Jackson, T Ron; Jones, Brinn E; Beadnell, Blair; Calsyn, Donald A

    2014-04-01

    Guided by a comprehensive implementation model, this study examined training/implementation processes for a tailored contingency management (CM) intervention instituted at a Clinical Trials Network-affiliate opioid treatment program (OTP). Staff-level training outcomes (intervention delivery skill, knowledge, and adoption readiness) were assessed before and after a 16-hour training, and again following a 90-day trial implementation period. Management-level implementation outcomes (intervention cost, feasibility, and sustainability) were assessed at study conclusion in a qualitative interview with OTP management. Intervention effectiveness was also assessed via independent chart review of trial CM implementation vs. a historical control period. Results included: 1) robust, durable increases in delivery skill, knowledge, and adoption readiness among trained staff; 2) positive managerial perspectives of intervention cost, feasibility, and sustainability; and 3) significant clinical impacts on targeted patient indices. Collective results offer support for the study's collaborative intervention design and the applied, skills-based focus of staff training processes. Implications for CM dissemination are discussed.

  2. Understanding influential factors on implementing green supply chain management practices: An interpretive structural modelling analysis.

    PubMed

    Agi, Maher A N; Nishant, Rohit

    2017-03-01

    In this study, we establish a set of 19 influential factors on the implementation of Green Supply Chain Management (GSCM) practices and analyse the interaction between these factors and their effect on the implementation of GSCM practices using the Interpretive Structural Modelling (ISM) method and the "Matrice d'Impacts Croisés Multiplication Appliquée à un Classement" (MICMAC) analysis on data compiled from interviews with supply chain (SC) executives based in the Gulf countries (Middle East region). The study reveals a strong influence and driving power of the nature of the relationships between SC partners on the implementation of GSCM practices. We especially found that dependence, trust, and durability of the relationship with SC partners have a very high influence. In addition, the size of the company, the top management commitment, the implementation of quality management and the employees training and education exert a critical influence on the implementation of GSCM practices. Contextual elements such as the industry sector and region and their effect on the prominence of specific factors are also highlighted through our study. Finally, implications for research and practice are discussed.

  3. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    NASA Astrophysics Data System (ADS)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  4. Aiding the environment: the Australian Development Agency's experience of implementing an environmental management system

    SciTech Connect

    Keen, Meg . E-mail: meg.keen@anu.edu.au; Sullivan, Marjorie

    2005-08-15

    Aid agencies, like commercial businesses, are increasingly concerned with incorporating sound environmental management into their operations. Different approaches are being used to integrate sustainability into development assistance to ensure that environmental impacts are assessed and managed. One approach being used by AusAID, the Australian aid agency, is to implement an environmental management system (EMS) across program and project areas. This paper examines how AusAID has adapted the EMS approach to suit aid agency operations, and some of the lessons from the Australian experience.

  5. Community Education as a Model for Site-Based Management Implementation.

    ERIC Educational Resources Information Center

    Tomberlin, Christine Murphy

    This paper attempts to interest principals considering site-based management to examine community education as a model for their implementation efforts. The paper first examines the evolution of the community education movement, focusing on major directions and levels of maturity. Next, the unchanging principles of community education…

  6. Notification: Evaluation of EPA’s Management Controls to Implement and Enforce Pesticide Worker Protection Standards

    EPA Pesticide Factsheets

    Project #OPE-FY17-0008, Feb 9, 2017.The EPA OIG plans to begin research to evaluate EPA’s management controls implementing the revised Worker Protection Standards (WPS) requirements to reduce pesticide exposure and risks to agricultural workers.

  7. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... submitted for the South Coast Air Quality Management District (District) portion of the California State... the prevention of significant deterioration of air quality and visibility protection. The purpose...

  8. Implementing Experiential Action Learning in International Management Education: The Global Business Strategic (GLOBUSTRAT) Consulting Program

    ERIC Educational Resources Information Center

    Kamath, Shyam; Agrawal, Jagdish; Krickx, Guido

    2008-01-01

    This paper discusses the theoretical foundations and implementation challenges and outcomes of a unique "hands-on" global consulting program that is integrated into an international EMBA program for mid-career and senior American and European managers. It details the challenges for the integration of experiential action learning, double-loop…

  9. From sacred cows to sacrificial lambs: implementing agricultural phosphorus science and management to combat eutrophication

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Experience with implementing agricultural phosphorus (P) strategies highlights successes and uncertainty over outcomes. We examine case studies from the USA, UK, and Sweden to examine P management under voluntary, litigated and regulatory settings. In the USA, voluntary strategies to curtail P loadi...

  10. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    ERIC Educational Resources Information Center

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  11. Developing and Implementing an Army-Specific Information Technology Management Curriculum at the Naval Postgraduate School

    DTIC Science & Technology

    2001-09-01

    addresses the military and civilian ACS institutions from which a FA53 officer may receive an advanced degree in the Information Technology (IT) discipline...thesis will explore the possible implementation of an Army-specific Information Technology Management curriculum at the Naval Postgraduate School (NPS

  12. Implementation of a UNIX-Based Network Management System for English Instruction.

    ERIC Educational Resources Information Center

    Schmitt, Lothar M.; Christianson, Kiel T.

    Pedagogical features and implementation of a UNIX-based management system (UNIEM) designed to support the instructor in teaching English as a second language using a network of workstations are described. The application discussed here is for teaching English composition to students at the University of Aizu (Japan). UNIEM is constructed to assist…

  13. Report: EPA Prepared to Implement Strategic Human Capital Management Activities But Challenges Remain

    EPA Pesticide Factsheets

    Report #2004-P-00024, September 20, 2004. EPA’s headquarters and regional offices are prepared to implement strategic human capital management activities, but an alignment of office-level activities to the Agency’s Strategy for Human Capital is lacking.

  14. Implementing a Quality Management Framework in a Higher Education Organisation: A Case Study

    ERIC Educational Resources Information Center

    O'Mahony, Kim; Garavan, Thomas N.

    2012-01-01

    Purpose: This paper aims to report and analyse the lessons learned from a case study on the implementation of a quality management system within an IT Division in a higher education (HE) organisation. Design/methodology/approach: The paper is based on a review of the relevant literatures and the use of primary sources such as document analysis,…

  15. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the South Coast Air Quality...

  16. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Feather River Air...

  17. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  18. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  19. The Development and Implementation of a Diversity Management Curriculum: Organizational Change through Exploration and Exploitation

    ERIC Educational Resources Information Center

    Danowitz, Mary Ann; Hanappi-Egger, Edeltraud; Hofmann, Roswitha

    2009-01-01

    Purpose: The purpose of this paper is to provide concepts and strategies to successfully introduce and implement curricular change; especially, related to incorporating diversity management into academic programs. Design/methodology/approach: Utilizing documents and accounts from two agents involved in the change process and an outside observer,…

  20. Enforced Cultural Change in Academe. A Practical Case Study: Implementing Management Systems in Higher Education.

    ERIC Educational Resources Information Center

    Spencer-Matthews, Sarah

    2001-01-01

    An action research project sought to implement a quality management system in an academic department in an Australian higher education institution. The case study revealed that technical change was attained, but adoption of a quality culture achieved only token acceptance. (EV)

  1. DOD Business Systems Modernization: Governance Mechanisms for Implementing Management Controls Need to Be Improved

    DTIC Science & Technology

    2012-06-01

    architecture BPR business process reengineering DCMO Deputy Chief Management Officer DITPR Defense Information Technology Portfolio Repository...statutory requirements. In addition, while DOD implemented a business process reengineering ( BPR ) review process, the department is not measuring...have not been validated. Further, while DOD has conducted various BPR activities related to its business system investments and underlying business

  2. Activity-Based Management System Implementation in Higher Education Institution: Benefits and Challenges

    ERIC Educational Resources Information Center

    Ismail, Noor Azizi

    2010-01-01

    Purpose: The purpose of this paper is to discuss how activity-based costing (ABC) technique can be applied in the context of higher education institutions. It also discusses the obstacles and challenges to the successful implementation of activity-based management (ABM) in the higher education environment. Design/methodology/approach: This paper…

  3. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air..., 2011, the submittal for Antelope Valley AQMD and SJVUAPCD Negative Declarations submitted on June...

  4. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air...

  5. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  6. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  7. Analyzing the Implementation of Nutrient Management Plans by Farmers: Implications for Extension Education

    ERIC Educational Resources Information Center

    Tao, Haiying; Morris, Thomas F.; Bravo-Ureta, Boris; Meinert, Richard

    2016-01-01

    We conducted case studies on four Connecticut dairy farms to evaluate how well farmers implemented their nutrient management plans (NMPs). Our findings can help Extension educators develop programs to improve NMPs and NMP adoption by farmers. We identified three educational topic areas that would likely increase NMP understanding and acceptance:…

  8. 75 FR 16486 - Proposed Comment Request for Review of ACF Disaster Case Management Implementation Guide; Office...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    .../her advocate and help him/ her organize and access disaster-related resources, human services, health... HUMAN SERVICES Administration for Children and Families Proposed Comment Request for Review of ACF Disaster Case Management Implementation Guide; Office of Human Services Emergency Preparedness and...

  9. Total Quality Management in the Community College: Concept, Application, Implementation--Lessons Learned.

    ERIC Educational Resources Information Center

    Coady, Sharon; And Others

    Based on the work of the National Alliance of Community and Technical Colleges and the Center on Education and Training for Employment, this document addresses the subject of Total Quality Management (TQM) in the community and technical college by examining the concept, application, and implementation of TQM and the lessons learned. First, "The…

  10. Strategies for Implementation: The El Camino College Total Quality Management Story.

    ERIC Educational Resources Information Center

    Schauerman, Sam; Peachy, Burt

    1994-01-01

    Traces the development of the principles and practices of Total Quality Management (TQM) at El Camino College, in California. Discusses institutional resistance to change and the need for careful implementation analysis and constituent group involvement. Includes a nine-item bibliography of theoretical and descriptive works. (MAB)

  11. Towards a Conceptual Model of the Implementation of Management and Planning Systems in Schools.

    ERIC Educational Resources Information Center

    Levine, Donald M.

    This paper considers conceptual alternatives for the development of information systems for management and planning in schools. Four problem areas which have been encountered in the introduction and implementation of such systems are identified, including lack of information, lack of understanding, lack of tools for the redress of problems, and…

  12. Communication Channels as Implementation Determinants of Performance Management Framework in Kenya

    ERIC Educational Resources Information Center

    Sang, Jane

    2016-01-01

    The purpose of this study to assess communication channels as implementation determinants of performance management framework In Kenya at Moi Teaching and Referral Hospital (MTRH). The communication theory was used to inform the study. This study adopted an explanatory design. The target sampled 510 respondents through simple random and stratified…

  13. A Bachelor of Engineering Technology Curriculum in Water Quality Management: Program Implementation.

    ERIC Educational Resources Information Center

    Cole, Charles A.; And Others

    Contained are summaries of support courses for a Bachelor of Engineering Technology (BET) Curriculum in Water Quality Management. Suggested courses in this volume include: math, physics, English, drafting, mechanics, civil engineering, and economics. Also included are self-appraisal suggestions for institutions considering implementation of this…

  14. Implementing Blended Self-Managed Action Learning for Digital Entrepreneurs in Higher Education

    ERIC Educational Resources Information Center

    Shurville, Simon; Rospigliosi, Asher

    2009-01-01

    We report upon implementing blended self-managed action learning (SMAL) within graduate and postgraduate courses in digital entrepreneurship. In four out of five cases, we found that SMAL was highly motivating to our learners and integrated well with a blended and flexible approach to learning. We report a case where a SMAL set broke down due to…

  15. Implementation of Systems to Support the Management of Research: Commentary from a UK University Perspective

    ERIC Educational Resources Information Center

    Rutherford, Scott; Langley, David

    2007-01-01

    The increasing complexity and diversity of a typical portfolio of research awards coupled with advancing technology makes successful implementation and delivery of system benefits more challenging than ever. Moreover, the role of systems in knowledge management is a fundamental issue faced by all research active organizations. One of the principal…

  16. Mandated Site-Based Management in Texas: Exploring Implementation in Urban High Schools.

    ERIC Educational Resources Information Center

    Kemper, Elizabeth A.; Teddlie, Charles

    2000-01-01

    Examined implementation of state-mandated site-based management (SBM) in Texas high schools. Teacher and principal surveys indicated that state-level reform policies were subject to interpretation at the school level. Urban schools had high levels of SBM program structure but low teacher perceptions of decision making responsibility. Case studies…

  17. Chicago’s O’Hare Runway Configuration Management System (RCMS). Volume 1. Description of the Operational Software,

    DTIC Science & Technology

    1987-07-01

    plans and configurations into the current mode . Submissions are made through positive action by the user; a default submission returns to the current...Bases to Software Programs 20 3 Relationship of Data Bases to Modes of Operation 21 4 Current Background Program Flowchart 22 5 Quarter-Hour Processing...facility and regional personnel from the Federal Aviation Administration (FAA) Great Lakes Region. The software was developed for the three modes of

  18. Development and Implementation of Critical Loads for Atmospheric Deposition: Federal Land Management Implications

    NASA Astrophysics Data System (ADS)

    Porter, E. M.

    2004-12-01

    Critical loads for atmospheric deposition have been widely developed and used in Europe, Canada, and other countries. Critical loads are used to influence air pollution emissions reductions, thereby protecting and restoring aquatic and terrestrial ecosystems. In the United States, federal land management agencies are adopting the critical load concept as a potentially valuable resource management tool. Certain parks and wilderness areas are currently being affected by anthropogenic nitrogen and sulfur deposition. Effects of excess deposition include acidification, nitrogen enrichment, toxicity, and changes in biotic communities. Streams in both Shenandoah and Great Smoky Mountains National Parks are experiencing chronic and episodic acidification and brook trout fisheries in Shenandoah have been affected. High elevation ecosystems in Rocky Mountain National Park are undergoing subtle changes in aquatic and terrestrial ecosystems attributable to atmospheric deposition. Natural resources in many other federal areas have been affected or are at risk from deposition. Federal land managers are refining strategies for critical loads that include working with scientists to identify resources sensitive to deposition, defining resource protection criteria that will meet management objectives, and estimating and implementing critical loads. Critical loads will be used in resource management decisions and federal land management planning. They will be used to evaluate management actions and assess progress towards meeting management goals. Federal land managers will also communicate critical loads information to air pollution regulatory agencies to inform emissions management strategies for clean air.

  19. Chronic disease management: implementation and coordination of healthcare systems for depressed elderly persons.

    PubMed

    Severinsson, Elisabeth; Holm, Anne Lise

    2014-12-01

    The aim of this study was to evaluate the implementation of the research-based Chronic Care Model (CCM), discuss methods and summarise research recommendations for improving the care of depressed elderly persons. Interviews were conducted and state-of-the-art reviews employed. Three important areas emerged: (1) barriers to and facilitating factors in the implementation of the CCM; (2) the challenges involved in re-designing the delivery system and interdisciplinary team collaboration; and (3) empirical evidence pertaining to self-management support and how older persons manage to live with depressive ill-health. In conclusion, implementation research requires evidence-based knowledge, staff involvement and familiarity with the context in which development occurs.

  20. Implementing a Clinical Research Management System: One Institution’s Successful Approach Following Previous Failures

    PubMed Central

    Campion, Thomas R.; Blau, Vanessa L.; Brown, Scott W.; Izcovich, Daniel; Cole, Curtis L.

    2014-01-01

    Clinical research management systems (CRMSs) can facilitate research billing compliance and clinician awareness of study activities when integrated with practice management and electronic health record systems. However, adoption of CRMSs remains low, and optimal approaches to implementation are unknown. This case report describes one institution’s successful approach to organization, technology, and workflow for CRMS implementation following previous failures. Critical factors for CRMS success included organizational commitment to clinical research, a dedicated research information technology unit, integration of research data across disparate systems, and centralized system usage workflows. In contrast, previous failed approaches at the institution lacked a mandate and mechanism for change, received support as a business rather than research activity, maintained data in separate systems, and relied on inconsistent distributed system usage workflows. To our knowledge, this case report is the first to describe CRMS implementation success and failures, which can assist practitioners and academic evaluators. PMID:25954570

  1. Modeling the leadership attributes of top management in green innovation implementation

    NASA Astrophysics Data System (ADS)

    Ishak, Noormaizatul Akmar; Ramli, Mohammad Fadzli

    2015-05-01

    The implementation of green innovation in the companies is the interest of the governments all over the world. This has been the main focus of the Copenhagen Protocol and Kyoto Protocol that require all governments to preserve the nature through green initiatives. This paper proposes a mathematical model on the leadership attributes of the top management in ensuring green innovation implementation in their companies' strategies to reduce operational cost. With green innovation implementation in the Government-Linked Companies (GLCs), we identify the leadership attributes are tied up to the leadership style of the top managers in the companies. Through this model we have proved that green type leadership always contributes better in cost saving, therefore it is a more efficient leadership attribute for the GLCs especially.

  2. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  3. Cultural Transformation After Implementation of Crew Resource Management: Is It Really Possible?

    PubMed

    Hefner, Jennifer L; Hilligoss, Brian; Knupp, Amy; Bournique, Judy; Sullivan, John; Adkins, Eric; Moffatt-Bruce, Susan D

    2016-07-15

    Crew resource management (CRM) has the potential to improve safety culture and reduce patient safety errors across different hospitals and inherent cultures, but hospital-wide implementations have not been studied. The authors examined the impact of a systematic CRM implementation across 8 departments spanning 3 hospitals and 2 campuses. The Hospital Survey on Patient Safety Culture (HSOPS) was administered electronically to all employees before CRM implementation and about 2 years after; changes in percent positive composite scores were compared in pre-post analyses. Across all respondents, there was a statistically significant increase in composite score for 10 of the 12 HSOPS dimensions (P < .05). These significant results persisted across the 8 departments studied and among both practitioners and staff. Consideration of score changes across dimensions reveals that the teamwork and communication dimensions of patient safety culture may be more highly influenced by CRM training than supervisor and management dimensions.

  4. Selecting a Course Management System: Selecting and Implementing a Course Management System

    ERIC Educational Resources Information Center

    Mandernach, B. Jean; Donnelli-Sallee, Emily; Dailey-Hebert, Amber

    2006-01-01

    Institutions of higher education are embracing the role of the Internet as a medium to promote on-demand communication between faculty and students. As such, online course management systems have become an efficient and effective means of facilitating learning outside the classroom. To ensure that a course management system meets the needs and…

  5. The role of organizational culture and leadership in water safety plan implementation for improved risk management.

    PubMed

    Summerill, Corinna; Pollard, Simon J T; Smith, Jennifer A

    2010-09-15

    Appropriate implementation of WSPs offers an important opportunity to engage in and promote preventative risk management within water utilities. To ensure success, the whole organization, especially executive management, need to be advocates. Illustrated by two case studies, we discuss the influence of organizational culture on buy-in and commitment to public health protection and WSPs. Despite an internal desire to undertake risk management, some aspects of organizational culture prevented these from reaching full potential. Enabling cultural features included: camaraderie; competition; proactive, involved leaders; community focus; customer service mentality; transparency; accountability; competent workforce; empowerment; appreciation of successes, and a continual improvement culture. Blocking features included: poor communication; inflexibility; complacency; lack of awareness, interest or reward and coercion. We urge water utilities to consider the influence of organizational culture on the success and sustainability of WSP adoption, and better understand how effective leadership can mould culture to support implementation.

  6. Initiatives and outcomes of green supply chain management implementation by Chinese manufacturers.

    PubMed

    Zhu, Qinghua; Sarkis, Joseph; Lai, Kee-hung

    2007-10-01

    This paper aims to explore the green supply chain management (GSCM) initiatives (implementation) of various manufacturing industrial sectors in China and examine the links between GSCM initiatives and performance outcomes. We conducted a survey to collect data from four typical manufacturing industrial sectors in China, namely, power generating, chemical/petroleum, electrical/electronic and automobile, and received 171 valid organizational responses for data analysis. Analysis of variance (ANOVA) was used to analyze the data. The results are consistent with our prediction that the different manufacturing industry types display different levels of GSCM implementation and outcomes. We specifically found that the electrical/electronic industry has relatively higher levels of GSCM implementation and achieves better performance outcomes than the other three manufacturer types. Implications of the results are discussed and suggestions for further research on the implementation of GSCM are offered.

  7. Sharing risk management: an implementation model for cardiovascular absolute risk assessment and management in Australian general practice

    PubMed Central

    Wan, Q; Harris, M F; Zwar, N; Vagholkar, S

    2008-01-01

    Purpose Despite considerable work in developing and validating cardiovascular absolute risk (CVAR) algorithms, there has been less work on models for their implementation in assessment and management. The aim of our study was to develop a model for a joint approach to its implementation based on an exploration of views of patients, general practitioners (GPs) and key informants (KIs). Methods We conducted six focus group (three with GPs and three with patients) and nine KI interviews in Sydney. Thematic analysis was used with comparison to highlight the similarities and differences in perspectives of participants. Results Conducting CVAR was seen as more acceptable for regular patients rather than new patients for whom GPs had to attract their interest and build rapport before doing so at the next visit. GPs’ interest and patients’ positive attitude in managing risk were important in implementing CVAR. Long consultations, good communication skills and having a trusting relationship helped overcome the barriers during the process. All the participants supported engaging patients to self-assess their risk before the consultation and sharing decision making with GPs during consultation. Involving practice staff to help with the patient self-assessment, follow-up and referral would be helpful in implementing CVAR assessment and management, but GPs, patients and practices may need more support for this to occur. Conclusions Multiple strategies are required to promote the better use of CVAR in the extremely busy working environment of Australian general practice. An implementation model has been developed based on our findings and the Chronic Care Model. Further research needs to investigate the effectiveness of the proposed model. PMID:18479283

  8. Line manager implementation perceptions as a mediator of relations between high-performance work practices and employee outcomes.

    PubMed

    Sikora, David M; Ferris, Gerald R; Van Iddekinge, Chad H

    2015-11-01

    Strategic human resources management (SHRM) scholars recently have suggested that high-performance work practices (HPWP) implementation might serve as a critical mediator between HPWP and workplace outcomes. This study proposes and tests a model that positions line managers' perceptions regarding the extent to which they implement their organization's HPWP as a mediator of relations between HPWP and employee attitudes (i.e., turnover intentions and participative decision-making perceptions) and behavior (i.e., job performance). Using data from 507 line managers and 109 matched line manager-subordinate response sets, the results suggest that line managers' HPWP implementation perceptions fully mediate relations between HPWP and employee outcomes. The authors also found that line managers' human resources competency and political skill affect their HPWP implementation perceptions. Overall, these findings contribute to a more informed understanding of relationships between HPWP and work outcomes and suggest that additional SHRM research is needed to better understand whether and how HPWP are implemented.

  9. The value of forage measurement information in rangeland management. [implementation of satellite data in range management

    NASA Technical Reports Server (NTRS)

    Lietzke, K. R.

    1975-01-01

    An economic model and simulation are developed to estimate the potential social benefit arising from the use of alternative measurement systems in rangeland management. In order to estimate these benefits, it was necessary to model three separate systems: the range environment, the rangeland manager, and the information system which links the two. The rancher's decision-making behavior is modeled according to sound economic principles. Results indicate substantial potential benefits, particularly when used in assisting management of government-operated ranges; possible annual benefits in this area range from $20 to $46 million, depending upon the system capabilities assumed. Possible annual benefit in privately-managed stocker operations range from $2.8 to $49.5 million, depending upon where actual rancher capabilities lie and what system capabilities are assumed.

  10. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey

    PubMed Central

    2013-01-01

    Background Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Methods Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Results Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users’ low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Conclusion Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative

  11. Implementing a genomic data management system using iRODS in the Wellcome Trust Sanger Institute

    PubMed Central

    2011-01-01

    Background Increasingly large amounts of DNA sequencing data are being generated within the Wellcome Trust Sanger Institute (WTSI). The traditional file system struggles to handle these increasing amounts of sequence data. A good data management system therefore needs to be implemented and integrated into the current WTSI infrastructure. Such a system enables good management of the IT infrastructure of the sequencing pipeline and allows biologists to track their data. Results We have chosen a data grid system, iRODS (Rule-Oriented Data management systems), to act as the data management system for the WTSI. iRODS provides a rule-based system management approach which makes data replication much easier and provides extra data protection. Unlike the metadata provided by traditional file systems, the metadata system of iRODS is comprehensive and allows users to customize their own application level metadata. Users and IT experts in the WTSI can then query the metadata to find and track data. The aim of this paper is to describe how we designed and used (from both system and user viewpoints) iRODS as a data management system. Details are given about the problems faced and the solutions found when iRODS was implemented. A simple use case describing how users within the WTSI use iRODS is also introduced. Conclusions iRODS has been implemented and works as the production system for the sequencing pipeline of the WTSI. Both biologists and IT experts can now track and manage data, which could not previously be achieved. This novel approach allows biologists to define their own metadata and query the genomic data using those metadata. PMID:21906284

  12. Systematic Work Environment Management: experiences from implementation in Swedish small-scale enterprises.

    PubMed

    Gunnarsson, Kristina; Andersson, Ing-Marie; Rosén, Gunnar

    2010-01-01

    Small-scale enterprises face difficulties in fulfilling the regulations for organising Systematic Work Environment Management. This study compared three groups of small-scale manufacturing enterprises with and without support for implementing the provision. Two implementation methods, supervised and network method, were used. The third group worked according to their own ideas. Twenty-three enterprises participated. The effects of the implementation were evaluated after one year by semi-structured dialogue with the manager and safety representative. Each enterprise was classified on compliance with ten demands concerning the provision. The work environment was estimated by the WEST-method. Impact of the implementation on daily work was also studied. At the follow-up, the enterprises in the supervised method reported slightly more improvements in the fulfilment of the demands in the provision than the enterprises in the network method and the enterprises working on their own did. The effect of the project reached the employees faster in the enterprises with the supervised method. In general, the work environment improved to some extent in all enterprises. Extensive support to small-scale enterprises in terms of advise and networking aimed to fulfil the regulations of Systematic Work Environment Management had limited effect - especially considering the cost of applying these methods.

  13. Design and Implementation of an Interdisciplinary Marketing/Management Course on Technology and Innovation Management

    ERIC Educational Resources Information Center

    Athaide, Gerard A.; Desai, Harsha B.

    2005-01-01

    Given increasing industry demand for integrative learning, marketing curricula need to emphasize interdisciplinary approaches to teaching. Although team teaching is a useful method for achieving cross-functional integration, there are very few frameworks for effectively implementing team teaching. Consequently, marketing educators seeking to offer…

  14. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  15. Global Access Programs: A Collaborative Approach for Effective Implementation and Management.

    PubMed

    Ainge, Debra; Aitken, Suzanne; Corbett, Mark; De-Keyzer, David

    Global access programs (GAPs) provide access to medicinal products for patients with serious medical conditions and no commercially available treatment options. Providing early access to medicines can be challenging for a pharmaceutical company. The demand for a GAP often occurs at a time when other activities are the prime focus, such as delivery of pivotal clinical trials or gaining of marketing authorization. Furthermore, the skills, experience, and infrastructure necessary to implement and manage a successful GAP vary significantly from those required for regular clinical trial execution, and the regulatory environment presents its own challenges, with regulations often poorly defined and with considerable inter-country variation. This article considers the triggers for early access requests and examines the need for companies to develop a global strategy for GAPs in order to respond appropriately to requests for early access. It also provides a comprehensive overview of the processes for GAP set-up, implementation, management, and closure, along with the considerations affecting the type and scope of GAP, such as demand, regulatory feasibility, license status of the product, drug pricing structure, company strategy, costs, and product supply. Also discussed is the need for appropriate personnel to implement and manage the GAP, and when to consider collaboration with an external GAP provider. In summary, GAPs require careful and efficient planning and management, from set-up to closure. Well-run GAPs provide an ethical and regulatory-compliant pathway for access of new treatments to patients with serious conditions and an unmet medical need.

  16. Environmental management practices in the Lebanese pharmaceutical industries: implementation strategies and challenges.

    PubMed

    Massoud, May A; Makarem, N; Ramadan, W; Nakkash, R

    2015-03-01

    This research attempts to provide an understanding of the Lebanese pharmaceutical industries' environmental management strategies, priorities, and perceptions as well as drivers, barriers, and incentives regarding the implementation of the voluntary ISO 14001 Environmental Management System. Accordingly, a semistructured in-depth interview was conducted with the pharmaceutical industries. The findings revealed a significant lack of knowledge about the standard among the industries. The main perceived drivers for adopting the ISO 14001 are improving the companies' image and overcoming international trade. The main perceived barriers for acquiring the standard are the lack of government support and the fact that ISO 14001 is not being legally required or enforced by the government. Moreover, results revealed that adopting the ISO 14001 standard is not perceived as a priority for the Lebanese pharmaceutical industries. Although the cost of certification was not considered as a barrier for the implementation of ISO 14001, the majority of the pharmaceutical industries are neither interested nor willing to adopt the Standard if they are not exposed to any regulatory pressure or external demand. They are more concerned with quality and safety issues with the most adopted international standard among the industries being the ISO 9001 quality management system. This study highlights the aspect that financial barriers are not always the hurdles for implementing environmental management strategies in developing countries and underscores the need for regulatory frameworks and enforcement.

  17. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    PubMed Central

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B.; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-01-01

    Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the units. Future

  18. Implementation of the Performance Management System (PMS) in Senior Secondary Schools in Botswana: An Investigation of Senior Management Team's Expected Benefits of the PMS

    ERIC Educational Resources Information Center

    Bulawa, Philip

    2012-01-01

    Different forms of the performance management system have been implemented in many countries for some years. As in other countries, in 1999 the government of Botswana took a decision to implement a performance management system (PMS) across the entire public service including schools. The government explained the purpose for which this reform was…

  19. Dynamic Airspace Configuration

    NASA Technical Reports Server (NTRS)

    Bloem, Michael J.

    2014-01-01

    In air traffic management systems, airspace is partitioned into regions in part to distribute the tasks associated with managing air traffic among different systems and people. These regions, as well as the systems and people allocated to each, are changed dynamically so that air traffic can be safely and efficiently managed. It is expected that new air traffic control systems will enable greater flexibility in how airspace is partitioned and how resources are allocated to airspace regions. In this talk, I will begin by providing an overview of some previous work and open questions in Dynamic Airspace Configuration research, which is concerned with how to partition airspace and assign resources to regions of airspace. For example, I will introduce airspace partitioning algorithms based on clustering, integer programming optimization, and computational geometry. I will conclude by discussing the development of a tablet-based tool that is intended to help air traffic controller supervisors configure airspace and controllers in current operations.

  20. [Management of quality in an Intensive Care Unit: implementation of ISO 9001:2008 international standard].

    PubMed

    Lorenzo Torrent, R; Sánchez Palacios, M; Santana Cabrera, L; Cobian Martinez, J L; García del Rosario, C

    2010-10-01

    The Quality Management Systems make it possible to prioritize actions to maintain the safety and efficacy of health technologies. The Intensive Care Unit of our hospital has implemented a quality management plan, which has obtained accreditation as "Service Certificate that manages its activities according to UNE-EN ISO 9001:2008" standard. With the application of quality management system, it has been possible to detect the needs that the Service can cover in order to obtain the satisfaction of the patient, relative or health personnel of the other services of the hospital, to improve communications inside and outside of service, to secure greater understanding of the processes of the organization and control of risk, to delimit responsibilities clearly to all the personnel, to make better use of the time and resources and, finally, to improve the motivation of the personnel.

  1. [Implementation of quality management in medical rehabilitation--current challenges for rehabilitation facilities].

    PubMed

    Enge, M; Koch, A; Müller, T; Vorländer, T

    2010-12-01

    The legal responsibilities imposed upon rehabilitation facilities under section 20 (2a) SGB IX, necessitate fundamental decisions to be taken regarding the development of quality management systems over and above the existing framework. This article is intended to provide ideas and suggestions to assist rehabilitation facilities in implementing a quality management system, which is required in addition to participation in the quality assurance programmes stipulated by the rehabilitation carriers. In this context, the additional internal benefit a functioning quality management system can provide for ensuring a high level of quality and for maintaining the competitiveness of the rehabilitation facility should be taken into account. The core element of these observations, hence, is a list of requirements which enables assessment of the quality of consultants' performance in setting up a quality management system.

  2. A Plan for the Development and Implementation of Planning, Programming, Budgeting and Evaluation System, and Management Information System.

    ERIC Educational Resources Information Center

    Wesolowski, Zdzislaw P.

    The implementation of a Planning, Budgeting and Evaluation System (PPBES) and a Management Information System (MIS) at Polk Community College will consider the needs, the objectives, and the priorities of the college. The tasks in the development and implementation of a PPBS system are: development of an implementation plan (specific tasks…

  3. Implementation of Sustainable Soil Management Practices to Improve Crop Production in the Different Ethiopian Agro Systems

    NASA Astrophysics Data System (ADS)

    García Moreno, R.; Gameda, S.; Diaz Alvarez, M. C.; Selasie, Y. G.

    2012-04-01

    Agriculture in Ethiopia is one of first priority since close to 10 In this context, the Ethiopian crop production faces to the following soil management challenges: lack of updated soil data, macro and micro nutrient depletion, acidity, salinity and soil surface erosion and crusting. One of the biggest issues is the loss of arable land, above 137 T/yr, reaching during some particularly dried periods until 300 T/yr. In this context, the authors constituted a working group of experts from Spanish and Ethiopian universities, local producers and international and governmental organisms to analyse the problems related to the different agro ecological zones found in Ethiopia and the management practices of different local producers. The study produced the trends to implement in the different areas to improve soil management practices in order to contribute to increase the crop production mainly to achieve food security problems. The analyse produced different working fields for the next years for addressing soil degradation, improving land resources management practices, increasing agricultural productivity, updating the available soil data, developing an international program of education, transferring of knowledge from similar study cases and implementing economical tools to help producers to assure income after severe edapho-climatic events. The practical work and the projects developed for the next period is addressed to smallholder farms belonging to the different 34 agro ecological zones identified in Ethiopia, each of them with very specific environmental, cultural and soil management practices.

  4. Implementing chronic disease management in the public healthcare sector in Singapore: the role of hospitals.

    PubMed

    Cheah, J; Heng, B H

    2001-01-01

    The public health care delivery system in Singapore faces the challenges of a rapidly ageing population, an increasing chronic disease burden, increasing healthcare cost, rising expectations and demand for better health services, and shortage of resources. It is also fragmented, resulting in duplication and lack of coordination between institutions. A disease management approach has been adopted by the National Healthcare Group (NHG) as a critical strategy to provide holistic, cost-effective, seamless and well-coordinated care across the continuum. The framework in the development of the disease management plan included identifying the diseases and defining the target population, organizing a multi-disciplinary team lead by a clinician champion, defining the core components, treatment protocols and evaluation methods, defining the goals, and measuring and managing the outcomes. As disease management and case management for chronic diseases are new approaches adopted in the healthcare delivery system, there is a lack of understanding by healthcare professionals. The leadership and participation of hospital physicians was sought in the planning, design and outcomes monitoring to ensure their 'buy-in' and the successful implementation and effectiveness of the program. The episodic diagnosis related group (DRG)-based framework of funding and subvention for healthcare, and the shortage of step-care care facilities, have been recognized by the Ministry of Health as an impediments to the implementation, and these are currently being addressed.

  5. An analysis of the implementation of an environmental management system in a local public administration.

    PubMed

    Lozano, Macarena; Vallés, José

    2007-03-01

    The Environmental Management System (EMS) is commonly implemented in private firms. However, on the basis of a strengths, weaknesses, opportunities and threats (SWOT) analysis, our work analyzes the consequences of implementing an EMS within the context of local public administrations, particularly regarding the City Council of Ohanes in Almería (Spain). This is the first European corporation to implement an EMS according to the ISO 14001 Standard, certified by the Spanish Association of Normalization and Certification. Its analysis would be equivalent to the Shumpeterian "market innovator study", so that public administration "followers" can take advantage of the derived benefits and of minimizing the negative effects of such an experience. On the other hand, we show that the economic and environmental advantages derived from the EMS go beyond the activities that the City Council is in charge of. They have spillover effects that extend them to all economic activities in the municipality and these effects are expected to be increased in the medium and long-term perspective. In this paper, we compare the costs and benefits that the municipality obtains in two cases: the City Council implements the EMS or it does not implement it. The main objective of this article is to show the economic and environmental advantages obtained by a municipality when it is only the City Council who is implementing an EMS. It is logical to suppose that this case study can stimulate other municipalities to use this instrument, even if the economic and environmental characteristics of the municipality are different.

  6. IEA Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Meier, Alan; Runci, Paul J.

    2008-08-05

    This guide presents insights and guidance from DOE’s gathered through longstanding and extensive participation in IEA implementing agreements (IAs) and annexes. Even though DOE has been a key participant in international research activities through the IEA since the 1970s, the experience, knowledge, and institutional memory associated with these activities can be lost or forgotten easily as key DOE managers retire or leave the department. The guide seeks to assemble in a single reference some of the learning that has occurred through participation in IEA IAs as a guide for BTP managers currently responsible for IAs and for those who might consider entering into new IEA activities in the future.

  7. National Aeronautics and Space Administration Marshall Space Flight Center Space Transportation Directorate Risk Management Implementation Program

    NASA Technical Reports Server (NTRS)

    Duarte, Luis Alberto; Kross, Denny (Technical Monitor)

    2001-01-01

    The US civil aerospace program has been a great contributor to the creation and implementation of techniques and methods to identify, analyze, and confront risk. NASA has accomplished mission success in many instances, but also has had many failures. Anomalies have kept the Agency from achieving success on other occasions, as well. While NASA has mastered ways to prevent risks, and to quickly and effectively react and recover from anomalies or failures, it was not until few years ago that a comprehensive Risk Management process started being implemented in some of its programs and projects. A Continuous Risk Management (CRM) cycle process was developed and has been promoted and used successfully in programs and projects across the Agency.

  8. A Structured Management Approach to Implementation of Health Promotion Interventions in Head Start

    PubMed Central

    Herman, Ariella; Teutsch, Carol; Chung, Paul J.

    2013-01-01

    Improving the health and health literacy of low-income families is a national public health priority in the United States. The federal Head Start program provides a national infrastructure for implementation of health promotion interventions for young children and their families. The Health Care Institute (HCI) at the Anderson School of Management at the University of California, Los Angeles, developed a structured approach to health promotion training for Head Start grantees using business management principles. This article describes the HCI approach and provides examples of implemented programs and selected outcomes, including knowledge and behavior changes among Head Start staff and families. This prevention-focused training platform has reached 60,000 Head Start families in the United States since its inception in 2001. HCI has demonstrated consistent outcomes in diverse settings and cultures, suggesting both scalability and sustainability. PMID:24028835

  9. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    PubMed

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  10. Implement a site management strategy to save money and achieve timely closure

    SciTech Connect

    Buratovich-Collins, J.

    1996-12-31

    Federal regulatory standards for remediation of contaminated groundwater have been technically impossible to meet within reasonable time frames and budgets. A site management strategy (SMS) defending alternate cleanup levels (ACLs) or technical impracticability (TI) waivers and characterizing risk, managing site data, and implementing a practical site remediation approach can be very effective in saving time and money at contaminated sites. The engineering and scientific communities have been looking for practical solutions to groundwater cleanup at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. Records of Decisions (RODs) and Corrective Measures Implementation Plans have historically specified cleanup standards for contaminated groundwater that are technically impossible to meet within reasonable time frames (such as drinking water standards). Restoration of drinking water standards was the cleanup goal for groundwater in 270 of approximately 300 Superfund RODs issued between 1987 and 1991. These statistics notwithstanding, very few sites contaminated with organic chemicals have been remediated to numerical groundwater standards.

  11. Implementation of management strategies for diabetes and hypertension: from local to global health in cardiovascular diseases.

    PubMed

    Bloomfield, Gerald S; Wang, Tracy Y; Boulware, L Ebony; Califf, Robert M; Hernandez, Adrian F; Velazquez, Eric J; Peterson, Eric D; Li, Jennifer S

    2015-03-01

    Diabetes and hypertension are chronic conditions that are growing in prevalence as major causal factors of cardiovascular disease (CVD). The need for chronic-illness surveillance, population-risk management, and successful treatment interventions are crucial for reducing the burden of future CVD. Addressing these problems will require population-risk stratification, task-sharing and -shifting, and community-as well as network-based care. Information technology tools also provide new opportunities for identifying those at risk and for implementing comprehensive approaches to achieving the goal of improved health locally, regionally, nationally, and globally. This article discusses ongoing efforts at one university health center in the implementation of management strategies for diabetes and hypertension at the local, regional, national, and global levels.

  12. Implementing chronic disease self-management in community settings: lessons from Australian demonstration projects.

    PubMed

    Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J

    2007-11-01

    The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits.

  13. Implementing practice management strategies to improve patient care: the EPIC project.

    PubMed

    Attwell, David; Rogers-Warnock, Leslie; Nemis-White, Joanna

    2012-01-01

    Healthcare gaps, the difference between usual care and best care, are evident in Canada, particularly with respect to our aging, ailing population. Primary care practitioners are challenged to identify, prevent and close care gaps in their practice environment given the competing demands of informed, litigious patients with complex medical needs, ever-evolving scientific evidence with new treatment recommendations across many disciplines and an enhanced emphasis on quality and accountability in healthcare. Patient-centred health and disease management partnerships using measurement, feedback and communication of practice patterns and outcomes have been shown to narrow care gaps. Practice management strategies such as the use of patient registries and recall systems have also been used to help practitioners better understand, follow and proactively manage populations of patients in their practice. The Enhancing Practice to Improve Care project was initiated to determine the impact of a patient-centred health and disease management partnership using practice management strategies to improve patient care and outcomes for patients with chronic kidney disease (CKD). Forty-four general practices from four regions of British Columbia participated and, indeed, demonstrated that care and outcomes for patients with CKD could be improved via the implementation of practice management strategies in a patient-centred partnership measurement model of health and disease management.

  14. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  15. Performance evaluation of River Basin Organizations to implement integrated water resources management using composite indexes

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    In the Southern African Development Community region, Integrated Water Resources Management (IWRM) principles and tools are being implemented through the existing regional framework for water resources development and management. The IWRM approach is applied at river basin level seeking a balance between the economic efficiency, social equity and environmental sustainability in water resources management and development. This paper uses composite indexes to analyze the performance of River Basin Organizations (RBOs) as key implementing agents of the IWRM framework. The assessment focuses on three RBOs that fall under the Regional Water Administration for Southern Mozambique (ARA-Sul) jurisdiction, namely: Umbeluzi, Incomati and Limpopo River Basin Management Units. The analysis focus on the computation of a set of multidimensional key performance indicators developed by Hooper (2010) but adapted to the Mozambican context. This research used 24 out of 115 proposed universal key performance indicators. The indicators for this case study were selected based on their suitability to evaluate performance in line with the legal and institutional framework context that guides the operations of RBOs in Mozambique. Finally these indicators were integrated in a composite index, using an additive and multiplicative aggregation method coupled with the Analytic Hierarchy Process technique employed to differentiate the relative importance of the various indicators considered. The results demonstrate the potential usefulness of the methodology developed to analyze the RBOs performance and proved useful in identifying the main performance areas in need of improvement for better implementation of IWRM at river basin level in Mozambique. This information should support both the IWRM framework adaptation to local context and the implementation at river basin level in order to improve water governance.

  16. Development and Implementation of a Comprehensive Risk Management Program at the USAF Academy Hospital.

    DTIC Science & Technology

    1980-04-01

    31, 1979. USAFA Hospital Regulation 161-7, Hospital Employee Health Program, Jul 14, 1978. USAFA Hospital Regulation 168-1, Patient Questionaires , Oct...Al87 344 DEVELOPMENT AND IMPLEMENTATION OF A COMPREHENSIVE RISK 1 MANAGEMENT PROGRAM AT THE USAF ACADEMY HOSPITAL(U) ARMY HEALTH CARE STUDIES AND...Baylor University In Partial Fulfillment of the Requirements for the Degree of Master of Health Administration By Captain Charles W. Boone, USAF, MSC

  17. Design and Implementation of 3D Model Data Management System Based on SQL

    NASA Astrophysics Data System (ADS)

    Li, Shitao; Zhang, Shixin; Zhang, Zhanling; Li, Shiming; Jia, Kun; Hu, Zhongxu; Ping, Liang; Hu, Youming; Li, Yanlei

    CAD/CAM technology plays an increasingly important role in the machinery manufacturing industry. As an important means of production, the accumulated three-dimensional models in many years of design work are valuable. Thus the management of these three-dimensional models is of great significance. This paper gives detailed explanation for a method to design three-dimensional model databases based on SQL and to implement the functions such as insertion, modification, inquiry, preview and so on.

  18. International Energy Agency Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

    SciTech Connect

    Evans, Meredydd; Runci, Paul; Meier, Alan

    2008-08-01

    This report presents results from a program evaluation of the U.S. Department of Energy?s Buildings Technologies Program (BTP) participation in collaborative international technology implementing agreements. The evaluation was conducted by researchers from the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory in the fall of 2007 and winter 2008 and was carried out via interviews with stakeholders in four implementing agreements in which BTP participates, reviews of relevant program reports, websites and other published materials. In addition to these findings, the report includes a variety of supporting materials such that aim to assist BTP managers who currently participate in IEA implementing agreements or who may be considering participation.

  19. Implementation of the SITAN algorithm in the digital terrain management and display system

    SciTech Connect

    Cambron, T.M.; Snyder, F.B.; Fellerhoff, J.R.

    1985-01-01

    This paper describes the functional methodologies and development processes used to integrate the SITAN autonomous navigation algorithm with the Digital Terrain Management and Display System (DTMDS) for real-time demonstrations aboard the AFTI/F-16 aircraft. Heretofore, the SITAN algorithm has not been implemented for real-time operation aboard a military aircraft. The paper describes the implementation design of the DTMDS and how the elevation data base supported by the digital map generator subsystem is made available to the SITAN algorithm. The effects of aircraft motion as related to SITAN algorithm timing and processor loading are evaluated. The closed-loop implementation with the AFTI aircraft inertial navigation system (INS) was specifically selected for the initial demonstration.

  20. [Practical implementation of a quality management system in a radiological department].

    PubMed

    Huber, S; Zech, C J

    2011-10-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.

  1. Research and guidelines for implementing Fatigue Risk Management Systems for the French regional airlines.

    PubMed

    Cabon, Philippe; Deharvengt, Stephane; Grau, Jean Yves; Maille, Nicolas; Berechet, Ion; Mollard, Régis

    2012-03-01

    This paper describes research that aims to provide the overall scientific basis for implementation of a Fatigue Risk Management System (FRMS) for French regional airlines. The current research has evaluated the use of different tools and indicators that would be relevant candidates for integration into the FRMS. For the Fatigue Risk Management component, results show that biomathematical models of fatigue are useful tools to help an airline to prevent fatigue related to roster design and for the management of aircrew planning. The Fatigue Safety assurance includes two monitoring processes that have been evaluated during this research: systematic monitoring and focused monitoring. Systematic monitoring consists of the analysis of existing safety indicators such as Air Safety Reports (ASR) and Flight Data Monitoring (FDM). Results show a significant relationship between the hours of work and the frequency of ASR. Results for the FDM analysis show that some events are significantly related to the fatigue risk associated with the hours of works. Focused monitoring includes a website survey and specific in-flight observations and data collection. Sleep and fatigue measurements have been collected from 115 aircrews over 12-day periods (including rest periods). Before morning duties, results show a significant sleep reduction of up to 40% of the aircrews' usual sleep needs leading to a clear increase of fatigue during flights. From these results, specific guidelines are developed to help the airlines to implement the FRMS and for the airworthiness to oversight the implementation of the FRMS process.

  2. Implementation of a framework for multi-species, multi-objective adaptive management in Delaware Bay

    USGS Publications Warehouse

    McGowan, Conor P.; Smith, David R.; Nichols, James D.; Lyons, James; Sweka, John A.; Kalasz, Kevin; Niles, Lawrence J.; Wong, Richard; Brust, Jeffrey; Davis, Michelle C.; Spear, Braddock

    2015-01-01

    Decision analytic approaches have been widely recommended as well suited to solving disputed and ecologically complex natural resource management problems with multiple objectives and high uncertainty. However, the difference between theory and practice is substantial, as there are very few actual resource management programs that represent formal applications of decision analysis. We applied the process of structured decision making to Atlantic horseshoe crab harvest decisions in the Delaware Bay region to develop a multispecies adaptive management (AM) plan, which is currently being implemented. Horseshoe crab harvest has been a controversial management issue since the late 1990s. A largely unregulated horseshoe crab harvest caused a decline in crab spawning abundance. That decline coincided with a major decline in migratory shorebird populations that consume horseshoe crab eggs on the sandy beaches of Delaware Bay during spring migration. Our approach incorporated multiple stakeholders, including fishery and shorebird conservation advocates, to account for diverse management objectives and varied opinions on ecosystem function. Through consensus building, we devised an objective statement and quantitative objective function to evaluate alternative crab harvest policies. We developed a set of competing ecological models accounting for the leading hypotheses on the interaction between shorebirds and horseshoe crabs. The models were initially weighted based on stakeholder confidence in these hypotheses, but weights will be adjusted based on monitoring and Bayesian model weight updating. These models were used together to predict the effects of management actions on the crab and shorebird populations. Finally, we used a dynamic optimization routine to identify the state dependent optimal harvest policy for horseshoe crabs, given the possible actions, the stated objectives and our competing hypotheses about system function. The AM plan was reviewed, accepted and

  3. The case and opportunity for public-supported financial incentives to implement integrated pest management.

    PubMed

    Brewer, Michael J; Hoard, Robert J; Landis, Joy N; Elworth, Lawrence E

    2004-12-01

    Food, water, and worker protection regulations have driven availability, and loss, of pesticides for use in pest management programs. In response, public-supported research and extension projects have targeted investigation and demonstration of reduced-risk integrated pest management (IPM) techniques. But these new techniques often result in higher financial burden to the grower, which is counter to the IPM principle that economic competitiveness is critical to have IPM adopted. As authorized by the 2002 Farm Bill and administered by the U.S. Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS), conservation programs exist for delivering public-supported financial incentives to growers to increase environmental stewardship on lands in production. NRCS conservation programs are described, and the case for providing financial incentives to growers for implementing IPM is presented. We also explored the opportunity and challenge to use one key program, the Environmental Quality Incentives Program (EQIP), to aid grower adoption of IPM. The EQIP fund distribution to growers from 1997 to 2002 during the last Farm Bill cycle totaled approximately 1.05 billion dollars with a portion of funds supporting an NRCS-designed pest management practice. The average percentage of allocation of EQIP funds to this pest management practice among states was 0.77 +/- 0.009% (mean +/- SD). Using Michigan as an example, vegetable and fruit grower recognition of the program's use to implement IPM was modest (25% of growers surveyed), and their recognition of its use in aiding implementation of IPM was improved after educational efforts (74%). Proposals designed to enhance program usefulness in implementing IPM were delivered through the NRCS advisory process in Michigan. Modifications for using the NRCS pest management practice to address resource concerns were adopted, incentive rates for pest management were adjusted, and an expanded incentive structure for IPM

  4. Hybrid Electric Vehicle Power Management Solutions Based on Isolated and Non-Isolated Configurations of MMCCC Converter

    SciTech Connect

    Khan, Faisal H; Tolbert, Leon M; Webb, William E

    2009-01-01

    This paper presents the various configurations of a multilevel modular capacitor-clamped converter (MMCCC), and it reveals many useful and new formations of the original MMCCC for transferring power in either an isolated or nonisolated manner. The various features of the original MMCCC circuit are best suited for a multibus system in future plug-in hybrid or fuel-cell-powered vehicles' drive train. The original MMCCC is capable of bidirectional power transfer using multilevel modular structure with capacitor-clamped topology. It has a nonisolated structure, and it offers very high efficiency even at partial loads. This circuit was modified to integrate single or multiple high-frequency transformers by using the intermediate voltage nodes of the converter. On the other hand, a special formation of the MMCCC can exhibit dc outputs offering limited isolation without using any isolation transformer. This modified version can produce a high conversion ratio from a limited number of components and has several useful applications in providing power to multiple low-voltage loads in a hybrid or electric automobile. This paper will investigate the origin of generating ac outputs from the MMCCC and shows how the transformer-free version can be modified to create limited isolation from the circuit. In addition, this paper will compare various modified forms of the MMCCC topology with existing dc-dc converter circuits from compactness and component utilization perspectives.

  5. Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans

    NASA Astrophysics Data System (ADS)

    Neuhold, Clemens

    2013-04-01

    he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time

  6. 76 FR 45165 - Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... Part 2429 24 CFR Parts 5, 21, 84, 1000 RIN 2501-AD54 Implementation of Office of Management and Budget... Office of Management and Budget (OMB) to all federal agencies to consolidate into one CFR title all... grants and cooperative agreements comply with Office of Management and Budget (OMB) guidance...

  7. Improving Knowledge Management in the Health Service: Re-Engineering Approach Towards Successful Implementation

    NASA Astrophysics Data System (ADS)

    Gyampoh-Vidogah, Regina; Moreton, Robert

    Changes to business practices involve risks. There has always been an attempt to develop various concepts for successful restructuring of business processes to enable technology adoption. This is due to the fact that the success of any business depends as much on how it is structured, as well as its ability to adopt new technology. As a consequence, the great success stories of the global economy emanate from those organisations most capable of adopting new technology, which invariably includes information technology (IT). This chapter examines how business process re-engineering (BPR) can be used to improve knowledge management (KM) in health services by (i) assessing the effectiveness and usefulness of BPR; (ii) present a critical review of approaches to BPR; and (iii) describe a framework for using BPR for KM based on empirical research. The aim is to provide a sound strategic and tactical management approach for successful implementation of knowledge management systems (KMS) to improve health-care service project administration.

  8. IS0 9000 Implementation and Assessment: A Guide to Developing and Evaluating Quality Management Systems

    NASA Technical Reports Server (NTRS)

    Navarro, Robert J.; Grimm, Barry

    1996-01-01

    The agency has developed this reference publication to aid NASA organizations and their suppliers in the transition to IS0 9000. This guide focuses on the standard s intent, clarifies its requirements, offers implementation examples and highlights interrelated areas. It can assist anyone developing or evaluating NASA or supplier quality management systems. The IS0 9000 standards contain the basic elements for managing those processes that affect an organization's ability to consistently meet customer requirements. IS0 9000 was developed through the International Organization for Standardization and has been adopted as the US. national standard. These standards define a flexible foundation for customer focused process measurement, management and improvement that is the hallmark of world class enterprises.

  9. Implementation of a quality care management system for patients with arthritis of the hip and knee.

    PubMed

    Doerr, Christine R; Graves, Stephen E; Mercer, Graham E; Osborne, Richard H

    2013-02-01

    The Orthopaedic Unit of the Repatriation General Hospital (RGH) in Adelaide, South Australia has implemented a quality care management system for patients with arthritis of the hip and knee. The system not only optimises conservative management but ensures that joint replacement surgery is undertaken in an appropriate and timely manner. This new service model addresses identified barriers to service access and provides a comprehensive, coordinated strategy for patient management. Over 4 years the model has reduced waiting times for initial outpatient assessment from 8 to 3 months and surgery from 18 to 8 months, while decreasing length of stay from 6.3 to 5.3 days for hips and 5.8 to 5.3 days for knees. The service reforms have been accompanied by positive feedback from patients and referring general practitioners in relation to the improved coordination of care and enhanced efficiency in service delivery.

  10. Development of an Automated Micro-Computer Knowledge-Based Integrated Configuration Management System for the Stock Point Logistics Integrated Communications Environment (SPLICE) Project Management Staff.

    DTIC Science & Technology

    1986-03-01

    using a software product called SUPERCALC2. It has subsequently transitioned to LOTUS 1-2-3. The basic method of developing these orders remained...employed a data entry and validation feature that could be incorporated into the configuration module with little effort. LOTUS 1-2-3 was selected as the...posed some problems which had to be overcome prior to further development. LOTUS 1-2-3 and dBASE III both required special file formats and interfaces

  11. Multiscale guidance and tools for implementing a landscape approach to resource management in the Bureau of Land Management

    USGS Publications Warehouse

    Carter, Sarah K.; Carr, Natasha B.; Miller, Kevin H.; Wood, David J.A.

    2017-01-19

    The Bureau of Land Management (BLM) is implementing a landscape approach to resource management (hereafter, landscape approach) to more effectively work with partners and understand the effects of management decisions. A landscape approach is a set of concepts and principles used to guide resource management when multiple stakeholders are involved and goals include diverse and sustainable social, environmental, and economic outcomes. Core principles of a landscape approach include seeking meaningful participation of diverse stakeholders, considering diverse resource values in multifunctional landscapes, acknowledging the tradeoffs needed to meet diverse objectives in the context of sustainable resource management, and addressing the complexity of social and ecological processes by embracing interdisciplinarity and considering multiple and broad spatial and temporal perspectives.In chapter 1, we outline the overall goal of this report: to provide a conceptual foundation and framework for implementing a landscape approach to resource management in the BLM, focusing on the role of multiscale natural resource monitoring and assessment information. In chapter 2, we describe a landscape approach to resource management. BLM actions taken to implement a landscape approach include a major effort to compile broad-scale data on natural resource status and condition across much of the west. These broadscale data now provide a regional context for interpreting monitoring data collected at individual sites and informing decisions made for local projects. We also illustrate the utility of using multiscale data to understand potential effects of different resource management decisions, define relevant terms in landscape ecology, and identify spatial scales at which planning and management decisions may be evaluated.In chapter 3, we describe how the BLM Rapid Ecoregional Assessment program and Assessment, Inventory and Monitoring program may be integrated to provide the multiscale

  12. Staff perspectives regarding the implementation of a yoga intervention with chronic pain self-management in a clinical setting.

    PubMed

    Waddington, Emily A; Rogers Fuller, Reid K; Barloon, Rachel C K; Comiskey, Grace H; Portz, Jennifer Dickman; Holmquist-Johnson, Helen; Schmid, Arlene A

    2017-02-01

    Chronic pain affects millions of Americans and can be addressed through multiple modalities, interventions, and strategies. Yoga and self-management have been proven effective in treating chronic pain, but little research has been conducted on the feasibility and implementation barriers related to these alternative intervention forms. In our qualitative study, we examined staff perceptions regarding the feasibility of implementing yoga along with established self-management at a pain management clinic in Colorado. We utilized the Implementation Drivers of Competency, Organizational, and Leadership, and our added Hypothetical Driver to explore barriers and facilitators related to project implementation. Our findings suggest that positive staff and patient attitudes were crucial for successful implementation. We also identified physical space, transportation, and supportive leadership as necessary components of project implementation. Further research is needed to examine barriers such as funding to ensure intervention sustainability and the need for adequate staffing.

  13. [Design, implementation and evaluation of a management model of patient safety in hospitals in Catalonia, Spain].

    PubMed

    Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim

    2014-07-01

    Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues.

  14. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  15. Implementing a Chronic Disease Self-Management Program into China: The Happy Life Club™

    PubMed Central

    Browning, Colette Joy; Yang, Hui; Zhang, Tuohong; Chapman, Anna; Liu, Shuo; Enticott, Joanne; Thomas, Shane Andrew

    2015-01-01

    China is experiencing population aging, increased prevalence of chronic diseases, and reductions in the frequency of healthy lifestyle behaviors. In response to these significant transitions, China is implementing major reforms in health care services with a focus on strengthening primary health care. In this paper, we describe a 12-month diabetes management program, the Happy Life Club™ (HLC™), implemented in a primary health care setting in Beijing, that uses doctor and nurse health coaches trained in behavior change techniques and motivational interviewing (MI). This paper reports the results of this pilot study and discusses issues involved in the implementation of Chronic Diseases Self-Management Programs in China. The intervention group showed improvements in HbA1c levels at 6 months and both the control and intervention groups showed reductions in waist circumference over time. Systolic blood pressure improved over time in the intervention group. The intervention group showed improvement in quality of life across the intervention period and both groups showed decreases in psychological distress across the intervention. Doctor visits increased between baseline and 6 months, but there was no change in doctor visits between 6 and 12 months for both groups. The effects were modest, and further investigations are required to evaluate the long-term impact of health coach approaches in China. PMID:25964910

  16. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  17. The implementation of problem-based learning in health service management training programs.

    PubMed

    Stankunas, Mindaugas; Czabanowska, Katarzyna; Avery, Mark; Kalediene, Ramune; Babich, Suzanne Marie

    2016-10-03

    Purpose Strengthening management capacity within the health care sector could have a significant impact on population health. However, many training programs in this area are still delivered using a classic lecture-based approach. The purpose of this paper is to evaluate and better understand the feasibility of using a problem-based learning (PBL) approach in health services management training programs. Design/methodology/approach A PBL teaching approach (based on the Maastricht University model) was tested with second-year postgraduate students from the Master in Public Health Management program at the Lithuanian University of Health Sciences. Students' opinions about PBL were investigated using a questionnaire with eight open-ended questions. Thematic content analysis was chosen to reflect the search for patterns across the data. Findings Respondents stated that the main advantage of PBL was that it was a more interesting and effective way of learning: "It is easier to remember, when you study by yourself and discuss with all peers". In addition, it was mentioned that PBL initiated a rapid exchange of ideas and sharing of personal experience. Students stressed that PBL was a good tool for developing other skills as well, such as "public speaking, communication, logic thinking". All students recommended delivering all other courses in the health services management program using PBL methodologies. Originality/value Findings from our study suggest that PBL may be an effective approach to teaching health services management. Potential problems in implementation are noted.

  18. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran

    PubMed Central

    2014-01-01

    Background The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Results Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Conclusion Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems. PMID:24423020

  19. [Building and implementation of management system in laboratories of the National Institute of Hygiene].

    PubMed

    Rozbicka, Beata; Brulińska-Ostrowska, Elzbieta

    2008-01-01

    The rules of good laboratory practice have always been observed in the laboratories of National Institute of Hygiene (NIH) and the reliability of the results has been carefully cared after when performing tests for clients. In 2003 the laboratories performing analyses related to food safety were designated as the national reference laboratories. This, added to the necessity of compliance with work standards and requirements of EU legislation and to the need of confirmation of competence by an independent organisation, led to a decision to seek accreditation of Polish Centre of Accreditation (PCA). The following stages of building and implementation of management system were presented: training, modifications of Institute's organisational structure, elaboration of management system's documentation, renovation and refurbishment of laboratory facilities, implementation of measuring and test equipment's supervision, internal audits and management review. The importance of earlier experiences and achievements with regard to validation of analytical methods and guarding of the quality of the results through organisation and participation in proficiency tests was highlighted. Current status of accreditation of testing procedures used in NIH laboratories that perform analyses in the field of chemistry, microbiology, radiobiology and medical diagnostic tests was presented.

  20. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    SciTech Connect

    Streit, R.D.; Couture, S.A.

    1995-03-01

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ``demonstration technologies.`` Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria.

  1. Capacity building in rural Guatemala by implementing a solid waste management program

    SciTech Connect

    Zarate, M.A. Slotnick, J.; Ramos, M.

    2008-12-15

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatan between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper.

  2. Capacity building in rural Guatemala by implementing a solid waste management program.

    PubMed

    Zarate, M A; Slotnick, J; Ramos, M

    2008-12-01

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatán between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper.

  3. Implementing business continuity management systems and sharing best practices at a European bank.

    PubMed

    Aronis, Stelios; Stratopoulos, Georgios

    2016-01-01

    This paper provides an overview of the methodology applied by the Alpha Bank Group in order to implement a business continuity management (BCM) programme to its parent company (Alpha Bank SA), as well as to its subsidiaries in Albania, Bulgaria, Cyprus, Former Yugoslav Republic of Macedonia, Greece, Romania, Serbia, UK and Ukraine. It also reviews the problems faced, how they were overcome and the lessons learned. When implementing a BCM programme in a large organisation, it is very important to follow the methodology described by BCM standard ISO 22301, otherwise the business continuity plan is unlikely to work efficiently or comply with the business recovery requirements, as well as with the requirements of other interested parties, such as customers, regulatory authorities, vendors, service providers, critical associates, etc.

  4. Database Design and Implementation of Game Management System for Rescue Robot Contest

    NASA Astrophysics Data System (ADS)

    Yamauchi, Hitoshi; Kojima, Atsuhiro; Koeda, Masanao

    The Rescue Robot Contest is one of the robot contests concerning lifesaving in urban disasters. In this contest, loads of rescue dummies simulating disaster victims, and contest progression status are presented to audiences, and team members operating robots. This presentation is important for both robot activity evaluation and production effect. For these purposes, a game management system for Rescue Robot Contest is originally constructed and operated. In this system, a database system is employed as base system. And this system's role is for both recording all data and events, and real-time processing for the presentation. In this paper, design and implementation of the tables and built-in functions of the database which is foundation of this system are presented. For real-time processing, embedded functions and trigger functions are implemented. These functions generate unique latest records into specific tables which stores only latest data for quick access.

  5. Implementation and management of a biomedical observation dictionary in a large healthcare information system

    PubMed Central

    Vandenbussche, Pierre-Yves; Cormont, Sylvie; André, Christophe; Daniel, Christel; Delahousse, Jean; Charlet, Jean; Lepage, Eric

    2013-01-01

    Objective This study shows the evolution of a biomedical observation dictionary within the Assistance Publique Hôpitaux Paris (AP-HP), the largest European university hospital group. The different steps are detailed as follows: the dictionary creation, the mapping to logical observation identifier names and codes (LOINC), the integration into a multiterminological management platform and, finally, the implementation in the health information system. Methods AP-HP decided to create a biomedical observation dictionary named AnaBio, to map it to LOINC and to maintain the mapping. A management platform based on methods used for knowledge engineering has been put in place. It aims at integrating AnaBio within the health information system and improving both the quality and stability of the dictionary. Results This new management platform is now active in AP-HP. The AnaBio dictionary is shared by 120 laboratories and currently includes 50 000 codes. The mapping implementation to LOINC reaches 40% of the AnaBio entries and uses 26% of LOINC records. The results of our work validate the choice made to develop a local dictionary aligned with LOINC. Discussion and Conclusions This work constitutes a first step towards a wider use of the platform. The next step will support the entire biomedical production chain, from the clinician prescription, through laboratory tests tracking in the laboratory information system to the communication of results and the use for decision support and biomedical research. In addition, the increase in the mapping implementation to LOINC ensures the interoperability allowing communication with other international health institutions. PMID:23635601

  6. Strategic implementation of integrated water resources management in Mozambique: An A’WOT analysis

    NASA Astrophysics Data System (ADS)

    Gallego-Ayala, Jordi; Juízo, Dinis

    The Integrated Water Resources Management (IWRM) paradigm has become an important framework in development and management of water resources. Many countries in the Southern Africa region have begun water sector reforms to align the sector with the IWRM concepts. In 2007 the Mozambican Government started to update the policy and the legal framework of the water sector to foster the application of IWRM concept as a basis for achieving sustainable development. However the steps towards the implementation of this national framework are still in preparation. This research aims to identify and establish a priority ranking of the fundamental factors likely to affect the outcome of the IWRM reforms in Mozambique. This study uses the hybrid multi-criteria decision method A’WOT, a methodology coined by Kurttila et al. (2000). This method relies on the combination of the Strengths, Weaknesses, Opportunities, and Threats (SWOT) technique and the Analytic Hierarchy Process (AHP) technique. Using this procedure it is possible to identify and rank the factors affecting the functioning of a system. The key factors affecting the implementation of the IWRM, analysed in this study, were identified through an expert group discussion. These factors have been grouped into different categories of SWOT. Subsequently, the AHP methodology was applied to obtain the relative importance of each factor captured in the SWOT analysis; to this end the authors interviewed a panel of water resources management experts and practitioners. As a result, of this study and the application of the A’WOT methodology, the research identified and ranked the fundamental factors for the success of the IWRM strategy in Mozambique. The results of this study suggest that in Mozambique a planning strategy for the implementation of the IWRM should be guided mainly by combination of interventions in factors falling under opportunity and weakness SWOT groups.

  7. Versatile composite amplifier configuration

    NASA Astrophysics Data System (ADS)

    Gift, Stephan J. G.; Maundy, Brent

    2015-06-01

    This paper describes a versatile composite amplifier in which a current feedback amplifier (CFA) drives an operational amplifier (OPA). In the conventional OPA-CFA composite amplifier, an OPA drives a CFA resulting in a composite structure that combines the DC input stability of the OPA and the high speed capability of the CFA. The proposed composite configuration combines different features of the CFA and OPA, specifically the constant bandwidth property of the CFA and the high power and high current output capacity of the OPA. The new circuit is easily implemented in the standard inverting and non-inverting configurations using commercially available devices, and the accuracy and constant bandwidth features were experimentally verified. Local feedback around the associated CFA ensures that the proposed composite amplifier possesses a higher level of bandwidth constancy than a single CFA.

  8. Addressing methodological challenges in implementing the nursing home pain management algorithm randomized controlled trial

    PubMed Central

    Ersek, Mary; Polissar, Nayak; Du Pen, Anna; Jablonski, Anita; Herr, Keela; Neradilek, Moni B

    2015-01-01

    Background Unrelieved pain among nursing home (NH) residents is a well-documented problem. Attempts have been made to enhance pain management for older adults, including those in NHs. Several evidence-based clinical guidelines have been published to assist providers in assessing and managing acute and chronic pain in older adults. Despite the proliferation and dissemination of these practice guidelines, research has shown that intensive systems-level implementation strategies are necessary to change clinical practice and patient outcomes within a health-care setting. One promising approach is the embedding of guidelines into explicit protocols and algorithms to enhance decision making. Purpose The goal of the article is to describe several issues that arose in the design and conduct of a study that compared the effectiveness of pain management algorithms coupled with a comprehensive adoption program versus the effectiveness of education alone in improving evidence-based pain assessment and management practices, decreasing pain and depressive symptoms, and enhancing mobility among NH residents. Methods The study used a cluster-randomized controlled trial (RCT) design in which the individual NH was the unit of randomization. The Roger's Diffusion of Innovations theory provided the framework for the intervention. Outcome measures were surrogate-reported usual pain, self-reported usual and worst pain, and self-reported pain-related interference with activities, depression, and mobility. Results The final sample consisted of 485 NH residents from 27 NHs. The investigators were able to use a staggered enrollment strategy to recruit and retain facilities. The adaptive randomization procedures were successful in balancing intervention and control sites on key NH characteristics. Several strategies were successfully implemented to enhance the adoption of the algorithm. Limitations/Lessons The investigators encountered several methodological challenges that were inherent to

  9. Implementing Self-Managing Work Teams in a High Performance Work Environment

    DTIC Science & Technology

    1990-09-01

    TEAMS IN A HIGH PERFORMANCE WORK ENVIRONMENT THESIS Gerald L. Page, Captain, USAF AFIT/GLM/LSR/90S-42 4~ELECTE SDEC121l990 Approved for public r:elease...studies in this field. vii IMPLEMENTING SELF-MANAGING WORK TEAMS IN A HIGH PERFORMANCE WORK ENVIRONMENT I. Introduction Background Many organizations today...continuous improveimenIt be sustained by a positive work environment " (28:40). General Issue An aspect of TQM that shows great promise in achieving reduced

  10. Department of Energy's second-year implementation of the Federal Managers' Financial Integrity Act

    SciTech Connect

    Not Available

    1985-10-17

    GAO reviewed the implementation of the Federal Managers' Financial Integrity Act of 1982 by 23 federal departments and agencies. The act was intended to help reduce fraud, waste, and abuse in federal government operations by requiring agencies to assess and report annually to the President and the Congress on the adequacy of their internal controls and accounting systems. This report highlights the progress made and problems encountered by the Department of Energy (DOE) during its second year under the act. GAO evaluated DOE's efforts to correct internal control weaknesses and improve its accounting systems. GAO discusses ways in which DOE can strengthen its internal control and accounting system evaluations.

  11. Design and implementation of a power management module for a MUAV

    NASA Astrophysics Data System (ADS)

    Torres-Ortega, H.; García-Torales, G.; Estrada-Marmolejo, R.; Flores, Jorge L.

    2011-09-01

    The implementation of a photovoltaic and an electronic module that manages the energy improves the flight time and the autonomy performance in an UAV. The module consists in a device that tracking the maximum power point of PV module by a PWM current-voltage regulation to charge a Li-Po battery. Characterization and modeling of crystalline and amorphous solar cells has been made. Our simulation estimates speed of battery charge. As a result, we increase the autonomy of the battery charge which is reflected in a UAV that performs tasks in fewer flights and without human supervision.

  12. NASA-Langley Research Center's Aircraft Condition Analysis and Management System Implementation

    NASA Technical Reports Server (NTRS)

    Frye, Mark W.; Bailey, Roger M.; Jessup, Artie D.

    2004-01-01

    This document describes the hardware implementation design and architecture of Aeronautical Radio Incorporated (ARINC)'s Aircraft Condition Analysis and Management System (ACAMS), which was developed at NASA-Langley Research Center (LaRC) for use in its Airborne Research Integrated Experiments System (ARIES) Laboratory. This activity is part of NASA's Aviation Safety Program (AvSP), the Single Aircraft Accident Prevention (SAAP) project to develop safety-enabling technologies for aircraft and airborne systems. The fundamental intent of these technologies is to allow timely intervention or remediation to improve unsafe conditions before they become life threatening.

  13. Daily Planet Redesign: eZ Publish Web Content Management Implementation

    NASA Technical Reports Server (NTRS)

    Dutra, Jayne E.

    2006-01-01

    This viewgraph presentation reviews the process of the redesign of the Daily . Planet news letter as a content management implementation project. This is a site that is an internal news site that acts as a communication vehicle for a large volume of content. The Objectives for the site redesign was: (1) Clean visual design, (2) Facilitation of publication processes, (3) More efficient maintenance mode, (4) Automated publishing to internal portal, (5) Better navigation through improved site IA, (6) Archiving and retrieval functionality, (7) Back to basics on fundamental business goals. The CM is a process not a software package

  14. Institutional Control Policies and Implementation for the Area 5 and Area 3 Radioactive Waste Management Sites

    SciTech Connect

    Vefa Yucel, Greg Shott, Denise Wieland, et al.

    2007-11-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has implemented varying institutional control policies in performance assessment/composite analysis (PA/CA) calculations for the Area 5 and Area 3 Radioactive Waste Management Sites (RWMSs) (Shott et al., 1998; 2000; Bechtel Nevada [BN] and Neptune and Company Inc. [Neptune], 2006). The facilities are within the actively maintained boundaries of the Nevada Test Site (NTS) that are enforced by NNSA/NSO. Under current policies, access required for exposure of the member of public (MOP) or the inadvertent human intruder (IHI) is prohibited. Uncertainties affecting institutional control policies are the duration and effectiveness of the controls during the post-closure period. Implementing a uniform set of institutional control policies for the RWMSs that encompasses waste management and environmental restoration programs and is consistent with the end-state vision for the environmental management programs for the NTS (DOE, 2006) is a primary goal of the maintenance program. The NNSA/NSO Performance Management Plan (DOE, 2002) complies with DOE Policy P455.1, 'Use of Risk-Based End States' (DOE, 2003a). Expected future land uses are a driver in selecting acceptable end state conditions and clean-up goals for the NTS. NNSA/NSO Environmental Management's (EM's) land management assumptions and framework for Environmental Management activities are as follows: The NTS will remain under federal control in perpetuity as an NNSA test site, and the large buffer zone surrounding the NTS (the Nevada Test and Training Range) is assumed to remain under the control of the U.S. Air Force. There are no plans for transfer of any NTS lands to other agencies or public entities. Access will continue to be restricted to the NTS and the surrounding areas. For management purposes, NNSA/NV EM activities have been established based on the source of contamination and type of waste

  15. MATLAB/Simulink Framework for Modeling Complex Coolant Flow Configurations of Advanced Automotive Thermal Management Systems: Preprint

    SciTech Connect

    Titov, Eugene; Lustbader, Jason; Leighton, Daniel; Kiss, Tibor

    2016-03-22

    The National Renewable Energy Laboratory's (NREL's) CoolSim MATLAB/Simulink modeling framework was extended by including a newly developed coolant loop solution method aimed at reducing the simulation effort for arbitrarily complex thermal management systems. The new approach does not require the user to identify specific coolant loops and their flow. The user only needs to connect the fluid network elements in a manner consistent with the desired schematic. Using the new solution method, a model of NREL's advanced combined coolant loop system for electric vehicles was created that reflected the test system architecture. This system was built using components provided by the MAHLE Group and included both air conditioning and heat pump modes. Validation with test bench data and verification with the previous solution method were performed for 10 operating points spanning a range of ambient temperatures between -2 degrees C and 43 degrees C. The largest root mean square difference between pressure, temperature, energy and mass flow rate data and simulation results was less than 7%.

  16. Implementing natural resources management policy in Africa: A document and literature review

    SciTech Connect

    Brinkerhoff, D.W.; Gage, J.D.; Yeager, J.A.

    1992-04-01

    The organizational and management tasks involved in implementing natural resource management (NRM) policy in Africa are examined in the desk study. There are two main chapters. The first reviews 19 A.I.D. projects and programs in forestry/agroforestry, sustainable agriculture, and protected areas/biodiversity conservation in Africa. The study also identifies several troublesome features of NRM policies: the underlying contradiction between sustainable NRM and the prevailing economic development paradigm; the nature of NRM costs and benefits; the negative orientation of NRM regulations; and the tendency of NRM issues to generate conflict. A final section presents a set of strategic questions as a way to begin clarifying the complexity and multiplicity of factors and linkages that characterize NRM.

  17. Decreasing avoidable hospital admissions with the implementation of an emergency department case management program.

    PubMed

    Sharieff, Ghazala Q; Cantonis, Matt; Tressler, Michelle; Whitehead, Mary; Russe, Jamie; Lovell, Eric

    2014-01-01

    With the passage of the Affordable Care Act, increased emphasis has been placed on optimizing quality and reducing expenditures. The use of an emergency department case manager (EDCM) is reemerging as an important initiative in the quest to provide high-quality care and decrease unnecessary hospital admissions. A pilot study of the use of EDCMs was conducted in one of the authors' EDs during a 6-month trial period. By using evidence-based criteria, the EDCM helped in real time to verify admission criteria, assisted with inpatient versus outpatient designation, found community alternatives to hospital admission, and initiated discharge planning for patients who required admission and were at high risk for readmission. EDCMs also worked with pharmacists to assist with medication management for patients who required assistance with obtaining prescriptions. Because of the pilot study's success, the authors' health care system will be implementing EDCMs throughout the organization.

  18. The TRITON Project: Design and Implementation of an Integrative Translational Research Information Management Platform

    PubMed Central

    Payne, Philip R.O.; Borlawsky, Tara B.; Stephens, William; Barrett, Matthew C.; Nguyen-Pham, Tri; Greaves, Andrew W.

    2010-01-01

    Multi-site consortia have become the preferred setting for team-based translational research programs. Such consortia are able to facilitate increased breadth and depth of basic science and clinical research activities, but also present numerous challenges related to data collection, analysis, storage, and exchange. The Chronic Lymphocytic Leukemia (CLL) Research Consortium (CRC), a s a prototypical instance of such a consortia, uses numerous loosely coupled web applications to address its informatics needs. Over a decade of operations have allowed the CRC to identify usability and computational limitations relative to the preceding information management architecture. In response, the CRC has launched the TRITON project, with the ultimate objective of developing an open-source, extensible, and fully integrative translational research information management platform. In this manuscript, we describe the architecture, design processes, and initial implementation of thatplatform. PMID:21347052

  19. Total Quality Management in Higher Education: Clearing the Hurdles. A Survey on Strategies for Implementing Quality Management Practices in Higher Education. A GOAL/QPC Application Report.

    ERIC Educational Resources Information Center

    Seymour, Daniel

    Based on a survey of Quality Management (QM) practitioners at 21 colleges, this study presents the 10 most difficult implementation hurdles to QM in higher education and a set of hurdle-clearing strategies. The hurdles are: (1) lack of time to implement QM; (2) perception that QM is something for janitorial and housing staffs but not applicable to…

  20. Integrated constructed wetlands: water management as a land-use issue, implementing the 'Ecosystem Approach'.

    PubMed

    Harrington, R; Carroll, P; Cook, S; Harrington, C; Scholz, M; McInnes, R J

    2011-01-01

    Awareness of the need for social, economic and environmental coherence in the management of water is becoming evermore apparent. Water supply as well as treatment is becoming more costly; a challenge that is not only limited to developing countries. The use of wetlands, natural and constructed, is now more widely accepted as a means of tackling a range of problems in water management to deliver this coherence. The use of 16 Integrated Constructed Wetlands that mimic shallow, emergent-vegetated, palustrine wetlands in a 2,500 ha catchment in County Waterford, Southeast Ireland, has shown a number of distinct advantages in implementing the all encompassing 'Ecosystem Approach', addressing the key elements for sustainable water management in an intensively used agricultural area. The significant increase in water quality, biodiversity, social amenities and acceptance by the local rural community provided by this 'real' field-scale demonstration show the benefits that such a joined-up approach can have on catchment management in the widest sense.