Sample records for connect pipe sections

  1. Multi-leg heat pipe evaporator

    NASA Technical Reports Server (NTRS)

    Alario, J. P.; Haslett, R. A. (Inventor)

    1986-01-01

    A multileg heat pipe evaporator facilitates the use and application of a monogroove heat pipe by providing an evaporation section which is compact in area and structurally more compatible with certain heat exchangers or heat input apparatus. The evaporation section of a monogroove heat pipe is formed by a series of parallel legs having a liquid and a vapor channel and a communicating capillary slot therebetween. The liquid and vapor channels and interconnecting capillary slots of the evaporating section are connected to the condensing section of the heat pipe by a manifold connecting liquid and vapor channels of the parallel evaporation section legs with the corresponding liquid and vapor channels of the condensing section.

  2. Valve malfunction detection apparatus

    NASA Astrophysics Data System (ADS)

    Burley, Richard K.

    1993-07-01

    A detection system is provided for sensing a malfunction of a valve having an outlet connected to an end of a first pipe through which pressurized fluid may be flowed in a downstream direction away from the valve. The system includes a bypass pipe connected at its opposite ends to the first pipe and operative to bypass a portion of the fluid flow therethrough around a predetermined section thereof. A housing is interiorly divided by a flexible diaphragm into first and second opposite chambers which are respectively communicated with the first pipe section and the bypass pipe, the diaphragm being spring-biased toward the second chamber. The diaphragm housing cooperates with check valves and orifices connected in the two pipes to create and maintain a negative pressure in the first pipe section in response to closure of the valve during pressurized flow through the first pipe. A pressure switch senses the negative pressure and transmits a signal indicative thereof to a computer. Upon cessation of the signal while the valve is still closed, the computer responsively generates a signal indicating that the valve, or another portion of the detection system, is leaking.

  3. Valve malfunction detection apparatus

    NASA Technical Reports Server (NTRS)

    Burley, Richard K. (Inventor)

    1993-01-01

    A detection system is provided for sensing a malfunction of a valve having an outlet connected to an end of a first pipe through which pressurized fluid may be flowed in a downstream direction away from the valve. The system includes a bypass pipe connected at its opposite ends to the first pipe and operative to bypass a portion of the fluid flow therethrough around a predetermined section thereof. A housing is interiorly divided by a flexible diaphragm into first and second opposite chambers which are respectively communicated with the first pipe section and the bypass pipe, the diaphragm being spring-biased toward the second chamber. The diaphragm housing cooperates with check valves and orifices connected in the two pipes to create and maintain a negative pressure in the first pipe section in response to closure of the valve during pressurized flow through the first pipe. A pressure switch senses the negative pressure and transmits a signal indicative thereof to a computer. Upon cessation of the signal while the valve is still closed, the computer responsively generates a signal indicating that the valve, or another portion of the detection system, is leaking.

  4. Hydrogen detector

    DOEpatents

    Kanegae, Naomichi; Ikemoto, Ichiro

    1980-01-01

    A hydrogen detector of the type in which the interior of the detector is partitioned by a metal membrane into a fluid section and a vacuum section. Two units of the metal membrane are provided and vacuum pipes are provided independently in connection to the respective units of the metal membrane. One of the vacuum pipes is connected to a vacuum gauge for static equilibrium operation while the other vacuum pipe is connected to an ion pump or a set of an ion pump and a vacuum gauge both designed for dynamic equilibrium operation.

  5. Dehumidifying Heat Pipe

    NASA Technical Reports Server (NTRS)

    Khattar, Mukesh K.

    1993-01-01

    U-shaped heat pipe partly dehumidifies air leaving air conditioner. Fits readily in air-handling unit of conditioner. Evaporator and condenser sections of heat pipe consist of finned tubes in comb pattern. Each tube sealed at one end and joined to manifold at other. Sections connected by single pipe carrying vapor to condenser manifold and liquid to evaporator manifold. Simple on/off or proportional valve used to control flow of working fluid. Valve actuated by temperature/humidity sensor.

  6. Pipe support for use in a nuclear system

    DOEpatents

    Pollono, Louis P.; Mello, Raymond M.

    1977-01-01

    A pipe support for high temperature, thin-walled vertical piping runs used in a nuclear system. A cylindrical pipe transition member, having the same inside diameter as the thin-walled piping, replaces a portion of the piping where support is desired. The outside diameter of the pipe transition member varies axially along its vertical dimension. For a section of the axial length adjacent the upper and lower terminations of the pipe transition member, the outside diameter is the same as the outside diameter of the thin-walled piping to which it is affixed. Intermediate of the termination sections, the outside diameter increases from the top of the member to the bottom. Adjacent the lower termination section, the diameter abruptly becomes the same as the piping. Thus, the cylindrical transition member is formed to have a generally triangular shaped cross-section along the axial dimension. Load-bearing insulation is installed next to the periphery of the member and is kept in place by an outer ring clamp. The outer ring clamp is connected to pipe hangers, which provide the desired support for the vertical thin-walled piping runs.

  7. Pipe support

    DOEpatents

    Pollono, Louis P.

    1979-01-01

    A pipe support for high temperature, thin-walled piping runs such as those used in nuclear systems. A section of the pipe to be supported is encircled by a tubular inner member comprised of two walls with an annular space therebetween. Compacted load-bearing thermal insulation is encapsulated within the annular space, and the inner member is clamped to the pipe by a constant clamping force split-ring clamp. The clamp may be connected to pipe hangers which provide desired support for the pipe.

  8. Connecting Ellipses to Rectangles in Passive Scalar Transport

    NASA Astrophysics Data System (ADS)

    Aminian, Manuchehr; Bernardi, Francesca; Camassa, Roberto; Harris, Daniel; McLaughlin, Richard

    2017-11-01

    We study how passive scalar transport in Poiseuille flow is affected by the shape of the pipe cross section. Our previous results have established nontrivial dependence of the skewness of the tracer distribution upon the pipe shape. Previously, we have studied the families of rectangles and ellipses, with the behavior past diffusive timescales primarily depending on aspect ratio, and the type of geometry being secondary. However, at timescales well before the diffusion timescale, the family of ellipses is distinct compared to rectangles. We investigate this phenomenon by studying a collection of exotic cross sections connecting the ellipses and rectangles, using a combination of theoretical and computational tools.

  9. 33 CFR 157.12d - Technical specifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section. The sampling probes located in the overboard discharge lines and the piping system connecting the sampling probes to the oil content meter must meet the requirements of this paragraph. (2) The piping and probes must be— (i) Of a material resistant to fire, corrosion, and oil; and (ii) Of adequate strength...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bandhauer, Todd; Deri, Robert J.; Elmer, John W.

    A laser diode package includes a heat pipe having a fluid chamber enclosed in part by a heat exchange wall for containing a fluid. Wicking channels in the fluid chamber is adapted to wick a liquid phase of the fluid from a condensing section of the heat pipe to an evaporating section of the heat exchanger, and a laser diode is connected to the heat exchange wall at the evaporating section of the heat exchanger so that heat produced by the laser diode is removed isothermally from the evaporating section to the condensing section by a liquid-to-vapor phase change ofmore » the fluid.« less

  11. RELAP-7 Progress Report: A Mathematical Model for 1-D Compressible, Single-Phase Flow Through a Branching Junction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berry, R. A.

    In the literature, the abundance of pipe network junction models, as well as inclusion of dissipative losses between connected pipes with loss coefficients, has been treated using the incompressible flow assumption of constant density. This approach is fundamentally, physically wrong for compressible flow with density change. This report introduces a mathematical modeling approach for general junctions in piping network systems for which the transient flows are compressible and single-phase. The junction could be as simple as a 1-pipe input and 1-pipe output with differing pipe cross-sectional areas for which a dissipative loss is necessary, or it could include an activemore » component, between an inlet pipe and an outlet pipe, such as a pump or turbine. In this report, discussion will be limited to the former. A more general branching junction connecting an arbitrary number of pipes with transient, 1-D compressible single-phase flows is also presented. These models will be developed in a manner consistent with the use of a general equation of state like, for example, the recent Spline-Based Table Look-up method [1] for incorporating the IAPWS-95 formulation [2] to give accurate and efficient calculations for properties for water and steam with RELAP-7 [3].« less

  12. Performance analysis of a solar still coupled with evacuated heat pipes

    NASA Astrophysics Data System (ADS)

    Pramod, B. V. N.; Prudhvi Raj, J.; Krishnan, S. S. Hari; Kotebavi, Vinod

    2018-02-01

    In developing countries the need for better quality drinking water is increasing steadily. We can overcome this need by using solar energy for desalination purpose. This process includes fabrication and analysis of a pyramid type solar still coupled with evacuated heat pipes. This experiment using evacuated heat pipes are carried in mainly three modes namely 1) Still alone 2) Using heat pipe with evacuated tubes 3)Using evacuated heat pipe. For this work single basin pyramid type solar still with 1m2 basin area is fabricated. Black stones and Black paint are utilised in solar still to increase evaporation rate of water in basin. The heat pipe’s evaporator section is placed inside evacuated tube and the heat pipe’s condenser section is connected directly to the pyramid type solar still’s lower portion. The output of distillate water from still with evacuated heat pipe is found to be 40% more than the still using only evacuated tubes.

  13. Extendable pipe crawler

    DOEpatents

    Hapstack, Mark

    1991-01-01

    A pipe crawler having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by "inchworm"-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward.

  14. The impact analysis of the connecting pipe length and diameter on the operation of a piston hybrid power machine of positive displacement with gas suction capacity

    NASA Astrophysics Data System (ADS)

    Shcherba, V. E.; Grigoriev, A. V.; Averyanov, G. S.; Surikov, V. I.; Vedruchenko, V. P.; Galdin, N. S.; Trukhanova, D. A.

    2017-08-01

    The article analyzes the impact of the connecting liquid pipe length and diameter on consumables and power characteristics of the piston hybrid power machine with gas suction capacity. The following operating characteristics of the machine were constructed and analyzed: the average height of the liquid column in the jacket space; instantaneous velocity and height of the liquid column in the jacket space; the relative height of the liquid column in the jacket space; volumetric efficiency; indicator isothermal efficiency; flowrate in the pump section; relative pressure losses during suction; relative flowrate. The dependence of the instantaneous pressure in the work space and the suction space of the compressor section on the rotation angle of the crankshaft is determined for different values of the length and diameter of the connecting pipeline.

  15. Heat Pipe-Assisted Thermoelectric Power Generation Technology for Waste Heat Recovery

    NASA Astrophysics Data System (ADS)

    Jang, Ju-Chan; Chi, Ri-Guang; Rhi, Seok-Ho; Lee, Kye-Bock; Hwang, Hyun-Chang; Lee, Ji-Su; Lee, Wook-Hyun

    2015-06-01

    Currently, large amounts of thermal energy dissipated from automobiles are emitted through hot exhaust pipes. This has resulted in the need for a new efficient recycling method to recover energy from waste hot exhaust gas. The present experimental study investigated how to improve the power output of a thermoelectric generator (TEG) system assisted by a wickless loop heat pipe (loop thermosyphon) under the limited space of the exhaust gas pipeline. The present study shows a novel loop-type heat pipe-assisted TEG concept to be applied to hybrid vehicles. The operating temperature of a TEG's hot side surface should be as high as possible to maximize the Seebeck effect. The present study shows a novel TEG concept of transferring heat from the source to the sink. This technology can transfer waste heat to any local place with a loop-type heat pipe. The present TEG system with a heat pipe can transfer heat and generate an electromotive force power of around 1.3 V in the case of 170°C hot exhaust gas. Two thermoelectric modules (TEMs) for a conductive block model and four Bi2Te3 TEMs with a heat pipe-assisted model were installed in the condenser section. Heat flows to the condenser section from the evaporator section connected to the exhaust pipe. This novel TEG system with a heat pipe can be placed in any location on an automobile.

  16. 46 CFR 35.35-5 - Electric bonding-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Electric bonding-TB/ALL. 35.35-5 Section 35.35-5... Electric bonding—TB/ALL. A tank vessel may be electrically connected to the shore piping, through which the cargo is to be transferred, prior to the connecting of a cargo hose. This electrical connection, if made...

  17. 46 CFR 35.35-5 - Electric bonding-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Electric bonding-TB/ALL. 35.35-5 Section 35.35-5... Electric bonding—TB/ALL. A tank vessel may be electrically connected to the shore piping, through which the cargo is to be transferred, prior to the connecting of a cargo hose. This electrical connection, if made...

  18. 46 CFR 35.35-5 - Electric bonding-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Electric bonding-TB/ALL. 35.35-5 Section 35.35-5... Electric bonding—TB/ALL. A tank vessel may be electrically connected to the shore piping, through which the cargo is to be transferred, prior to the connecting of a cargo hose. This electrical connection, if made...

  19. 21 CFR 1250.42 - Water systems; constant temperature bottles.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ....42 Section 1250.42 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... water system shall be protected against backflow. (b) Filling pipes or connections through which water... conveyances when they undergo heavy repairs. All filling connections shall be easily cleanable and so located...

  20. Extendable pipe crawler

    DOEpatents

    Hapstack, M.

    1991-05-28

    A pipe crawler is described having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by inchworm'-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figures.

  1. Extendable pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hapstack, M.

    1991-05-28

    A pipe crawler is described having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radially outward to increase the range of the legs when the pipe crawler enters a section of a pipe having a larger diameter. The crawler crawls by inchworm'-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly andmore » bring up the rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figures.« less

  2. Extendable pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hapstack, M.

    1990-05-01

    A pipe crawler having a front leg assembly and a back leg assembly connected together by two air cylinders, each leg assembly having four extendable legs and a pair of actuators for sliding the extendable legs radically outward to increase the range of the legs when the pipe crawler enters a section of pipe having a larger diameter. The crawler crawls by inchworm''-like motion, the front leg assembly and back leg assembly alternately engaging and disengaging the wall of the pipe to hold the pipe crawler as the air cylinders alternately advance the front leg assembly and bring up themore » rear leg assembly. The pair of actuators of each leg assembly are parallel, adjacent and opposing acting so that each slides two adjacent extendable legs radially outward. 5 figs.« less

  3. Gas pipe explorer robot

    NASA Technical Reports Server (NTRS)

    Wilcox, Brian (Inventor)

    2004-01-01

    A gas pipe explorer formed of a plurality of connecting elements, and an articulation element between the connected elements. The connected elements include drive capabilities, and the articulation element allows the connected elements to traverse gas pipes of arbitrary shapes and sizes. A sensor may sends the characteristics of the gas pipe, and the communication element may send back those sends characteristics. The communication can be wired, over a tether connecting the device to a remote end. Alternatively, the connection can be wireless, driven by either a generator or a battery.

  4. 46 CFR 52.15-5 - Tube connections (modifies PWT-9 and PWT-11).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Tube connections (modifies PWT-9 and PWT-11). 52.15-5 Section 52.15-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS Requirements for Watertube Boilers § 52.15-5 Tube connections (modifies PWT-9 and PWT-11). (a) Tubes, pipe and nipples shall be attached...

  5. 46 CFR 52.15-5 - Tube connections (modifies PWT-9 and PWT-11).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Tube connections (modifies PWT-9 and PWT-11). 52.15-5 Section 52.15-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS Requirements for Watertube Boilers § 52.15-5 Tube connections (modifies PWT-9 and PWT-11). (a) Tubes, pipe and nipples shall be attached...

  6. 46 CFR 52.15-5 - Tube connections (modifies PWT-9 and PWT-11).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Tube connections (modifies PWT-9 and PWT-11). 52.15-5 Section 52.15-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS Requirements for Watertube Boilers § 52.15-5 Tube connections (modifies PWT-9 and PWT-11). (a) Tubes, pipe and nipples shall be attached...

  7. 46 CFR 52.15-5 - Tube connections (modifies PWT-9 and PWT-11).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Tube connections (modifies PWT-9 and PWT-11). 52.15-5 Section 52.15-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS Requirements for Watertube Boilers § 52.15-5 Tube connections (modifies PWT-9 and PWT-11). (a) Tubes, pipe and nipples shall be attached...

  8. 46 CFR 52.15-5 - Tube connections (modifies PWT-9 and PWT-11).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Tube connections (modifies PWT-9 and PWT-11). 52.15-5 Section 52.15-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS Requirements for Watertube Boilers § 52.15-5 Tube connections (modifies PWT-9 and PWT-11). (a) Tubes, pipe and nipples shall be attached...

  9. 29 CFR 1910.159 - Automatic sprinkler systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... supply is out of service, except for systems of 20 or fewer sprinklers. (5) Hose connections for fire fighting use. The employer may attach hose connections for fire fighting use to wet pipe sprinkler systems... 29 Labor 5 2010-07-01 2010-07-01 false Automatic sprinkler systems. 1910.159 Section 1910.159...

  10. 29 CFR 1910.159 - Automatic sprinkler systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... supply is out of service, except for systems of 20 or fewer sprinklers. (5) Hose connections for fire fighting use. The employer may attach hose connections for fire fighting use to wet pipe sprinkler systems... 29 Labor 5 2013-07-01 2013-07-01 false Automatic sprinkler systems. 1910.159 Section 1910.159...

  11. 29 CFR 1910.159 - Automatic sprinkler systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supply is out of service, except for systems of 20 or fewer sprinklers. (5) Hose connections for fire fighting use. The employer may attach hose connections for fire fighting use to wet pipe sprinkler systems... 29 Labor 5 2014-07-01 2014-07-01 false Automatic sprinkler systems. 1910.159 Section 1910.159...

  12. 29 CFR 1910.159 - Automatic sprinkler systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... supply is out of service, except for systems of 20 or fewer sprinklers. (5) Hose connections for fire fighting use. The employer may attach hose connections for fire fighting use to wet pipe sprinkler systems... 29 Labor 5 2012-07-01 2012-07-01 false Automatic sprinkler systems. 1910.159 Section 1910.159...

  13. 29 CFR 1910.159 - Automatic sprinkler systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... supply is out of service, except for systems of 20 or fewer sprinklers. (5) Hose connections for fire fighting use. The employer may attach hose connections for fire fighting use to wet pipe sprinkler systems... 29 Labor 5 2011-07-01 2011-07-01 false Automatic sprinkler systems. 1910.159 Section 1910.159...

  14. Study of the use of truck tire beads as drainage pipe and analysis of the economics of tire disposal in Oklahoma. Part 1. Culverts. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everett, J.W.; Gattis, J.L.

    1994-07-01

    In an attempt to find alternate ways of dealing with waste truck tires, a private tire recycling company developed a pipe from the tire bead and sidewall. The tire-pipe has seen limited use as a roadway drainage culvert. To encourage wider use of this product, an evaluation of pipe performance was performed. The evaluation consisted of (1) inspections of existing installations; (2) structural tests; and (3) leakage tests. The study found that the majority of installations were performing well. Compared with corrugated steel and fiberglass pipes, the tire-pipe exhibited favorable structural performance. An individual tire-pipe section was found to bemore » watertight. However, when tested in the open-air (not in the ground), the tire-pipe joints were found to leak. Development of an improved end connection would improve the utility of the tire-pipe.« less

  15. Passive cooling system for a vehicle

    DOEpatents

    Hendricks, Terry Joseph; Thoensen, Thomas

    2005-11-15

    A passive cooling system for a vehicle (114) transfers heat from an overheated internal component, for example, an instrument panel (100), to an external portion (116) of the vehicle (114), for example, a side body panel (126). The passive cooling system includes one or more heat pipes (112) having an evaporator section (118) embedded in the overheated internal component and a condenser section (120) at the external portion (116) of the vehicle (114). The evaporator (118) and condenser (120) sections are in fluid communication. The passive cooling system may also include a thermally conductive film (140) for thermally connecting the evaporator sections (118) of the heat pipes (112) to each other and to the instrument panel (100).

  16. Passive Cooling System for a Vehicle

    DOEpatents

    Hendricks, T. J.; Thoensen, T.

    2005-11-15

    A passive cooling system for a vehicle (114) transfers heat from an overheated internal component, for example, an instrument panel (100), to an external portion (116) of the vehicle (114), for example, a side body panel (126). The passive cooling system includes one or more heat pipes (112) having an evaporator section (118) embedded in the overheated internal component and a condenser section (120) at the external portion (116) of the vehicle (114). The evaporator (118) and condenser (120) sections are in fluid communication. The passive cooling system may also include a thermally conductive film (140) for thermally connecting the evaporator sections (118) of the heat pipes (112) to each other and to the instrument panel (100).

  17. Numerical and experimental analysis of heat pipes with application in concentrated solar power systems

    NASA Astrophysics Data System (ADS)

    Mahdavi, Mahboobe

    Thermal energy storage systems as an integral part of concentrated solar power plants improve the performance of the system by mitigating the mismatch between the energy supply and the energy demand. Using a phase change material (PCM) to store energy increases the energy density, hence, reduces the size and cost of the system. However, the performance is limited by the low thermal conductivity of the PCM, which decreases the heat transfer rate between the heat source and PCM, which therefore prolongs the melting, or solidification process, and results in overheating the interface wall. To address this issue, heat pipes are embedded in the PCM to enhance the heat transfer from the receiver to the PCM, and from the PCM to the heat sink during charging and discharging processes, respectively. In the current study, the thermal-fluid phenomenon inside a heat pipe was investigated. The heat pipe network is specifically configured to be implemented in a thermal energy storage unit for a concentrated solar power system. The configuration allows for simultaneous power generation and energy storage for later use. The network is composed of a main heat pipe and an array of secondary heat pipes. The primary heat pipe has a disk-shaped evaporator and a disk-shaped condenser, which are connected via an adiabatic section. The secondary heat pipes are attached to the condenser of the primary heat pipe and they are surrounded by PCM. The other side of the condenser is connected to a heat engine and serves as its heat acceptor. The applied thermal energy to the disk-shaped evaporator changes the phase of working fluid in the wick structure from liquid to vapor. The vapor pressure drives it through the adiabatic section to the condenser where the vapor condenses and releases its heat to a heat engine. It should be noted that the condensed working fluid is returned to the evaporator by the capillary forces of the wick. The extra heat is then delivered to the phase change material through the secondary heat pipes. During the discharging process, secondary heat pipes serve as evaporators and transfer the stored energy to the heat engine. (Abstract shortened by ProQuest.).

  18. Loaded Transducer Fpr Downhole Drilling Component

    DOEpatents

    Hall, David R.; Hall, H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2005-07-05

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force," urging them closer together.

  19. Loaded transducer for downhole drilling components

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Briscoe, Michael A.; Dahlgren, Scott Steven; Fox, Joe; Sneddon, Cameron

    2006-02-21

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force, urging them closer together."

  20. Drill pipe threaded nipple connection design development

    NASA Astrophysics Data System (ADS)

    Saruev, A. L.; Saruev, L. A.; Vasenin, S. S.

    2015-11-01

    The paper presents the analysis of the behavior of the drill pipe nipple connection under the additional load generated by power pulses. The strain wave propagation through the nipple thread connection of drill pipes to the bottomhole is studied in this paper. The improved design of the nipple thread connection is suggested using the obtained experimental and theoretical data. The suggested connection design allows not only the efficient transmission of strain wave energy to a drill bit but also the automation of making-up and breaking-out drill pipes.

  1. Internal pipe attachment mechanism

    DOEpatents

    Bast, Richard M.; Chesnut, Dwayne A.; Henning, Carl D.; Lennon, Joseph P.; Pastrnak, John W.; Smith, Joseph A.

    1994-01-01

    An attachment mechanism for repairing or extending fluid carrying pipes, casings, conduits, etc. utilizing one-way motion of spring tempered fingers to provide a mechanical connection between the attachment mechanism and the pipe. The spring tempered fingers flex to permit insertion into a pipe to a desired insertion depth. The mechanical connection is accomplished by reversing the insertion motion and the mechanical leverage in the fingers forces them outwardly against the inner wall of the pipe. A seal is generated by crushing a sealing assembly by the action of setting the mechanical connection.

  2. Internal pipe attachment mechanism

    DOEpatents

    Bast, R.M.; Chesnut, D.A.; Henning, C.D.; Lennon, J.P.; Pastrnak, J.W.; Smith, J.A.

    1994-12-13

    An attachment mechanism is described for repairing or extending fluid carrying pipes, casings, conduits, etc. utilizing one-way motion of spring tempered fingers to provide a mechanical connection between the attachment mechanism and the pipe. The spring tempered fingers flex to permit insertion into a pipe to a desired insertion depth. The mechanical connection is accomplished by reversing the insertion motion and the mechanical leverage in the fingers forces them outwardly against the inner wall of the pipe. A seal is generated by crushing a sealing assembly by the action of setting the mechanical connection. 6 figures.

  3. 46 CFR 64.33 - Pipe connection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS Standards for an MPT § 64.33 Pipe connection. Each pipe connection that is not a pressure relief device must be fitted with a manually operated stop valve or closure located as close to the tank...

  4. Final Development, Testing, and Flight Preparation of the Rigidizable Get-Away-Special Experiment (RIGEX)

    DTIC Science & Technology

    2007-06-01

    threads connected to a steel braided hose with ¼” pipe ends. The steel braided hose is then connected to a ¼” 107 three-way union, which is...which can be switched back and forth, are connected to the nitrogen and vacuum source. The nitrogen source is connected through a steel braided hose ...from hot piping during hot runs. This is where most of the cryogenic piping and valves are mounted. The piping near the pump and the flex hose at

  5. Acoustic system for communication in pipelines

    DOEpatents

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  6. Transducer for downhole drilling components

    DOEpatents

    Hall, David R; Fox, Joe R

    2006-05-30

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. The transmission element may include an annular housing forming a trough, an electrical conductor disposed within the trough, and an MCEI material disposed between the annular housing and the electrical conductor.

  7. 5. FLOW METER AND PIPING SHOWING CONNECTIONS. Hot Springs ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. FLOW METER AND PIPING SHOWING CONNECTIONS. - Hot Springs National Park Bathhouse Row, Maurice Bathhouse: Mechanical & Piping Systems, State Highway 7, 1 mile north of U.S. Highway 70, Hot Springs, Garland County, AR

  8. An analysis of pipe flange connections using epoxy adhesives/anaerobic sealant instead of gaskets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sawa, T.; Sasaki, R.; Yoneno, M.

    1995-11-01

    This paper deals with the strength and the sealing performance of pipe flange connections combining the bonding force of adhesives with the clamping force of bolts. The epoxy adhesives or anaerobic sealants are bonded at the interface partially instead of gaskets in pipe flange connections. The stress distribution in the epoxy adhesives (anaerobic sealant), which governs the sealing performance, and the variations in axial bolt force are analyzed, using an axisymmetrical theory of elasticity, when an internal pressure is applied to a connection in which two pipe flanges are clamped together buy bolts and nuts with an initial clamping forcemore » after being joined by epoxy adhesives or anaerobic sealant. In addition, a method for estimating the strength of the combination connection is demonstrated. Experiments are performed and the analytical results are consistent with the experimental results concerning the variation in axial bolt force and the strength of combination connections. It can be seen that the strength of connections increases with a decrease in the bolt pitch circle diameter. Furthermore, it is seen that the sealing performance of such combination connections in which the interface is bonded partially is improved over that of pipe flange connections with metallic gaskets.« less

  9. Installation Of Service Connections For Sensors Or Transmitters In Buried Water Pipes

    DOEpatents

    Burnham, Alan K.; Cooper, John F.

    2006-02-21

    A system for installing warning units in a buried pipeline. A small hole is drilled in the ground to the pipeline. A collar is affixed to one of the pipes of the pipeline. A valve with an internal passage is connected to the collar. A hole is drilled in the pipe. A warning unit is installed in the pipe by moving the warning unit through the internal passage, the collar, and the hole in the pipe.

  10. Wedgethread pipe connection

    DOEpatents

    Watts, John D.

    2003-06-17

    Several embodiments of a wedgethread pipe connection are disclosed that have improved makeup, sealing, and non-loosening characteristics. In one embodiment, an open wedgethread is disclosed that has an included angle measured in the gap between the stab flank and the load flank to be not less than zero, so as to prevent premature wedging between mating flanks before the position of full makeup is reached, as does occur between trapped wedgethreads wherein the included angle is less than zero. The invention may be used for pipe threads large or small, as a flush joint, with collars, screwed into plates or it may even be used to reversibly connect such as solid posts to base members where a wide makeup torque range is desired. This Open wedgethread, as opposed to trapped wedgethreads, provides a threaded pipe connection that: is more cost-effective; can seal high pressure gas; can provide selectively a connection strength as high as the pipe strength; assures easy makeup to the desired position of full makeup within a wide torque range; may have a torque strength as high as the pipe torque strength; is easier to manufacture; is easier to gage; and is less subject to handling damage.

  11. CaSO4 Scale Formation on Vibrated Piping System in the Presence Citric Acid

    NASA Astrophysics Data System (ADS)

    Mangestiyono, W.; Jamari, J.; Muryanto, S.; Bayuseno, A. P.

    2018-02-01

    Vibration in many industries commonly generated by the operation mechanical equipment such as extruder, mixer, blower, compressor, turbine, generator etc. Vibration propagates into the floor and attacks the pipe around those mechanical equipment. In this paper, the influence of vibration in a pipe on the CaSO4 scale formation was investigated to understand the effect of vibration on the kinetics, mass of scale, crystal phases and crystal polymorph. To generate vibration force, mechanical equipment was prepared consisted of electrical motor, crankshaft, connecting rod and a vibration table at where test pipe section mounted. Deposition rate increased significantly when the vibration affected to the system i.e. 0.5997 and 1.6705 gr/hr for vibration frequency 4.00 and 8.00 Hz. The addition 10.00 ppm of citric acid declined the deposition rate of 8 Hz experiment from 3.4599 gr/hr to 2.2865 gr/hr.

  12. Arrangement for connecting a fiber-reinforced plastic pipe to a stainless steel flange

    DOEpatents

    Allais, Arnaud [D-30625 Hannover, DE; Hoffmann, Ernst [D-30855 Langenhagen, DE

    2008-02-05

    Arrangement for connecting a fiber-reinforced plastic pipe (18) to a stainless steel flange (12, 16), in which the end of the fiber-reinforced plastic pipe (18) is accommodated in a ring-shaped groove (12a, 16a) in the flange (12, 16), the groove conforming to the dimensions of the fiber-reinforced plastic pipe (18), where the gap remaining between the end of the fiber-reinforced plastic pipe (18) and the ring-shaped groove (12a, 16a) is filled with a sealant (19).

  13. Cold Start of a Radiator Equipped with Titanium-Water Heat Pipes

    NASA Technical Reports Server (NTRS)

    Jaworske, Donald A.; Sanzi, James L.; Siamidis, John

    2008-01-01

    Radiator panels utilizing titanium-water heat pipes are being considered for lunar applications. A traditional sandwich structure is envisioned where heat pipes are embedded between two high thermal conductivity face sheets. The heat pipe evaporators are to be thermally connected to the heat source through one or more manifolds containing coolant. Initial radiator operation on the lunar surface would likely follow a cold soak where the water in the heat pipes is purposely frozen. To achieve heat pipe operation, it will be necessary to thaw the heat pipes. One option is to allow the sunlight impinging on the surface at sunrise to achieve this goal. Testing was conducted in a thermal vacuum chamber to simulate the lunar sunrise and additional modeling was conducted to identify steady-state and transient response. It was found that sunlight impinging on the radiator surface at sunrise was insufficient to solely achieve the goal of thawing the water in the heat pipes. However, starting from a frozen condition was accomplished successfully by applying power to the evaporators. Start up in this fashion was demonstrated without evaporator dryout. Concern is raised over thawing thermosyphons, vertical heat pipes operating in a gravity field, with no wick in the condenser section. This paper presents the results of the simulated cold start study and identifies future work to support radiator panels equipped with titanium-water heat pipes.

  14. Small, Untethered, Mobile Robots for Inspecting Gas Pipes

    NASA Technical Reports Server (NTRS)

    Wilcox, Brian

    2003-01-01

    Small, untethered mobile robots denoted gas-pipe explorers (GPEXs) have been proposed for inspecting the interiors of pipes used in the local distribution natural gas. The United States has network of gas-distribution pipes with a total length of approximately 109 m. These pipes are often made of iron and steel and some are more than 100 years old. As this network ages, there is a need to locate weaknesses that necessitate repair and/or preventive maintenance. The most common weaknesses are leaks and reductions in thickness, which are caused mostly by chemical reactions between the iron in the pipes and various substances in soil and groundwater. At present, mobile robots called pigs are used to inspect and clean the interiors of gas-transmission pipelines. Some carry magnetic-flux-leakage (MFL) sensors for measuring average wall thicknesses, some capture images, and some measure sizes and physical conditions. The operating ranges of pigs are limited to fairly straight sections of wide transmission- type (as distinguished from distribution- type) pipes: pigs are too large to negotiate such obstacles as bends with radii comparable to or smaller than pipe diameters, intrusions of other pipes at branch connections, and reductions in diameter at valves and meters. The GPEXs would be smaller and would be able to negotiate sharp bends and other obstacles that typically occur in gas-distribution pipes.

  15. 24 CFR 3280.605 - Joints and connections.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of the fitting. Plastic pipe and copper tubing shall be inserted to the full depth of the solder cup..., cutting oil and foreign matter shall be removed. Pipe joint cement or thread lubricant shall be of... connected to a public water system, made with solder having not more than 0.2 percent lead. (4) Plastic pipe...

  16. 24 CFR 3280.605 - Joints and connections.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... of the fitting. Plastic pipe and copper tubing shall be inserted to the full depth of the solder cup..., cutting oil and foreign matter shall be removed. Pipe joint cement or thread lubricant shall be of... connected to a public water system, made with solder having not more than 0.2 percent lead. (4) Plastic pipe...

  17. 24 CFR 3280.605 - Joints and connections.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of the fitting. Plastic pipe and copper tubing shall be inserted to the full depth of the solder cup... connected to a public water system, made with solder having not more than 0.2 percent lead. (4) Plastic pipe, fittings and joints. Plastic pipe and fittings shall be joined by installation methods recommended by the...

  18. Ultrasonic pipe assessment

    DOEpatents

    Thomas, Graham H.; Morrow, Valerie L.; Levie, Harold; Kane, Ronald J.; Brown, Albert E.

    2003-12-23

    An ultrasonic pipe or other structure assessment system includes an ultrasonic transducer positioned proximate the pipe or other structure. A fluid connection between the ultrasonic transducer and the pipe or other structure is produced. The ultrasonic transducer is moved relative to the pipe or other structure.

  19. 46 CFR 39.1003 - Definitions-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Definitions-TB/ALL. 39.1003 Section 39.1003 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS VAPOR CONTROL SYSTEMS General § 39.1003 Definitions—TB/ALL. As used in this part only: Barge vapor connection means the point in a barge's piping...

  20. 46 CFR 39.1003 - Definitions-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Definitions-TB/ALL. 39.1003 Section 39.1003 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS VAPOR CONTROL SYSTEMS General § 39.1003 Definitions—TB/ALL. As used in this part only: Barge vapor connection means the point in a barge's piping...

  1. Performance of steel pipe pile-to-concrete bent cap connections subject to seismic or high transverse loading : Phase II

    DOT National Transportation Integrated Search

    2005-02-01

    The response of a concrete filled, steel pipe pile-to-concrete pile cap connection subjected to extreme lateral loads : was experimentally and analytically investigated in this project. This connection is part of a bridge support system : used by the...

  2. Passive advection-dispersion in networks of pipes: Effect of connectivity and relationship to permeability

    NASA Astrophysics Data System (ADS)

    Bernabé, Y.; Wang, Y.; Qi, T.; Li, M.

    2016-02-01

    The main purpose of this work is to investigate the relationship between passive advection-dispersion and permeability in porous materials presumed to be statistically homogeneous at scales larger than the pore scale but smaller than the reservoir scale. We simulated fluid flow through pipe network realizations with different pipe radius distributions and different levels of connectivity. The flow simulations used periodic boundary conditions, allowing monitoring of the advective motion of solute particles in a large periodic array of identical network realizations. In order to simulate dispersion, we assumed that the solute particles obeyed Taylor dispersion in individual pipes. When a particle entered a pipe, a residence time consistent with local Taylor dispersion was randomly assigned to it. When exiting the pipe, the particle randomly proceeded into one of the pipes connected to the original one according to probabilities proportional to the outgoing volumetric flow in each pipe. For each simulation we tracked the motion of at least 6000 solute particles. The mean fluid velocity was 10-3 ms-1, and the distance traveled was on the order of 10 m. Macroscopic dispersion was quantified using the method of moments. Despite differences arising from using different types of lattices (simple cubic, body-centered cubic, and face-centered cubic), a number of general observations were made. Longitudinal dispersion was at least 1 order of magnitude greater than transverse dispersion, and both strongly increased with decreasing pore connectivity and/or pore size variability. In conditions of variable hydraulic radius and fixed pore connectivity and pore size variability, the simulated dispersivities increased as power laws of the hydraulic radius and, consequently, of permeability, in agreement with previously published experimental results. Based on these observations, we were able to resolve some of the complexity of the relationship between dispersivity and permeability.

  3. TOWER, WEST ELEVATION, SHOWING CONNECTION PIPES FOR TURNOUTS 22 (FOREGROUND) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TOWER, WEST ELEVATION, SHOWING CONNECTION PIPES FOR TURNOUTS 22 (FOREGROUND) AND 24. NOTE “LAZY JACK” TEMPERATURE COMPENSATOR IN FOREGROUND. - Baltimore & Ohio Railroad, Z Tower, State Route 46, Keyser, Mineral County, WV

  4. 49 CFR 178.345-9 - Pumps, piping, hoses and connections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... there will be no leakage when connected. (d) Suitable provision must be made to allow for and prevent... any load applied by loading/unloading or charging lines connected to the cargo tank cannot cause damage resulting in loss of lading from the cargo tank. (h) Use of a nonmetallic pipe, valve or...

  5. Performance of steel pipe pile-to-concrete bent cap connections subject to seismic or high transverse loading - Phase I : Preliminary investigation

    DOT National Transportation Integrated Search

    1998-06-01

    The response of a concrete filled, steel pipe pile-to-concrete pile cap connection subjected to extreme lateral loads was experimentally and analytically investigated in this project. This connection is part of a bridge support system used by the Mon...

  6. Flexible pipe crawling device having articulated two axis coupling

    DOEpatents

    Zollinger, William T.

    1994-01-01

    An apparatus for moving through the linear and non-linear segments of piping systems. The apparatus comprises a front leg assembly, a rear leg assembly, a mechanism for extension and retraction of the front and rear leg assembles with respect to each other, such as an air cylinder, and a pivoting joint. One end of the flexible joint attaches to the front leg assembly and the other end to the air cylinder, which is also connected to the rear leg assembly. The air cylinder allows the front and rear leg assemblies to progress through a pipe in "inchworm" fashion, while the joint provides the flexibility necessary for the pipe crawler to negotiate non-linear piping segments. The flexible connecting joint is coupled with a spring-force suspension system that urges alignment of the front and rear leg assemblies with respect to each other. The joint and suspension system cooperate to provide a firm yet flexible connection between the front and rear leg assemblies to allow the pivoting of one with respect to the other while moving around a non-linear pipe segment, but restoring proper alignment coming out of the pipe bend.

  7. Flexible pipe crawling device having articulated two axis coupling

    DOEpatents

    Zollinger, W.T.

    1994-05-10

    An apparatus is described for moving through the linear and non-linear segments of piping systems. The apparatus comprises a front leg assembly, a rear leg assembly, a mechanism for extension and retraction of the front and rear leg assembles with respect to each other, such as an air cylinder, and a pivoting joint. One end of the flexible joint attaches to the front leg assembly and the other end to the air cylinder, which is also connected to the rear leg assembly. The air cylinder allows the front and rear leg assemblies to progress through a pipe in inchworm' fashion, while the joint provides the flexibility necessary for the pipe crawler to negotiate non-linear piping segments. The flexible connecting joint is coupled with a spring-force suspension system that urges alignment of the front and rear leg assemblies with respect to each other. The joint and suspension system cooperate to provide a firm yet flexible connection between the front and rear leg assemblies to allow the pivoting of one with respect to the other while moving around a non-linear pipe segment, but restoring proper alignment coming out of the pipe bend. 4 figures.

  8. THREADED ADAPTOR FOR LUGGED PIPE ENDS

    DOEpatents

    Robb, J.E.

    1962-06-01

    An adaptor is designed for enabling a threaded part to be connected to a member at a region having lugs normally receiving bayonet slots of another part for attachment of the latter. It has been found desirable to replace a closure cap connected in a bayonet joint to the end of a coolant tube containing nuclear- reactor fuel elements, with a threaded valve. An adaptor is used which has J- slots receiving lugs on the end of the reactor tube, a thread for connection with the valve, and gear-tooth section enabling a gear-type of tool to rotate the adaptor to seal the valve to the end of the reactor tube. (AEC)

  9. 24 CFR 3280.611 - Vents and venting.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Size of vent piping—(1) Main vent. The drain piping for each toilet shall be vented by a 11/2 inch... venting cross section of a 11/2 inch diameter vent, connected to the toilet drain by one of the following... toilet drain within the distance allowed in § 3280.611(c)(5), for 3-inch trap arms undiminished in size...

  10. 24 CFR 3280.611 - Vents and venting.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Size of vent piping—(1) Main vent. The drain piping for each toilet shall be vented by a 11/2 inch... venting cross section of a 11/2 inch diameter vent, connected to the toilet drain by one of the following... toilet drain within the distance allowed in § 3280.611(c)(5), for 3-inch trap arms undiminished in size...

  11. Heat pipes and use of heat pipes in furnace exhaust

    DOEpatents

    Polcyn, Adam D.

    2010-12-28

    An array of a plurality of heat pipe are mounted in spaced relationship to one another with the hot end of the heat pipes in a heated environment, e.g. the exhaust flue of a furnace, and the cold end outside the furnace. Heat conversion equipment is connected to the cold end of the heat pipes.

  12. Magnetic refrigeration system with separated inlet and outlet flow

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Auringer, Jon Jay; Boeder, Andre Michael; Chell, Jeremy Jonathan

    An active magnetic regenerative (AMR) refrigerator apparatus can include at least one AMR bed with a first end and a second end and a first heat exchanger (HEX) with a first end and a second end. The AMR refrigerator can also include a first pipe that fluidly connects the first end of the first HEX to the first end of the AMR bed and a second pipe that fluidly connects the second end of the first HEX to the first end of the AMR bed. The first pipe can divide into two or more sub-passages at the AMR bed. Themore » second pipe can divide into two or more sub-passages at the AMR bed. The sub-passages of the first pipe and the second pipe can interleave at the AMR bed.« less

  13. Relative benefits of on-plot water supply over other 'improved' sources in rural Vietnam.

    PubMed

    Brown, Joe; Hien, Vo Thi; McMahan, Lanakila; Jenkins, Marion W; Thie, Lauren; Liang, Kaida; Printy, Erin; Sobsey, Mark D

    2013-01-01

    Access to improved water sources is rapidly expanding in rural central Vietnam. We examined one NGO-led piped water supply programme to assess the drinking water quality and health impacts of piped water systems where access to 'improved' water sources is already good. This longitudinal, prospective cohort study followed 300 households in seven project areas in Da Nang province, Vietnam: 224 households who paid for an on-plot piped water connection and 76 control households from the same areas relying primarily on 'improved' water sources outside the home. The 4-month study was intended to measure the impact of the NGO-led water programmes on households' drinking water quality and health and to evaluate system performance. We found that: (i) households connected to a piped water supply had consistently better drinking water quality than those relying on other sources, including 'improved' sources and (ii) connected households experienced less diarrhoea than households without a piped water connection (adjusted longitudinal prevalence ratio: 0.57 (95% CI 0.39-0.86, P = 0.006) and households using an 'improved' source not piped to the plot: (adjusted longitudinal prevalence ratio: 0.59 (95% CI 0.39-0.91, P = 0.018). Our results suggest that on-plot water service yields benefits over other sources that are considered 'improved' by the WHO/UNICEF Joint Monitoring Programme. © 2012 Blackwell Publishing Ltd.

  14. Off-axis cooling of rotating devices using a crank-shaped heat pipe

    DOEpatents

    Jankowski, Todd A.; Prenger, F. Coyne; Waynert, Joseph A.

    2007-01-30

    The present invention is a crank-shaped heat pipe for cooling rotating machinery and a corresponding method of manufacture. The crank-shaped heat pipe comprises a sealed cylindrical tube with an enclosed inner wick structure. The crank-shaped heat pipe includes a condenser section, an adiabatic section, and an evaporator section. The crank-shape is defined by a first curve and a second curve existing in the evaporator section or the adiabatic section of the heat pipe. A working fluid within the heat pipe provides the heat transfer mechanism.

  15. Deployment, release and recovery of ocean riser pipes

    DOEpatents

    Person, Abraham; Wetmore, Sherman B.; McNary, James F.

    1980-11-18

    An ocean thermal energy conversion facility includes a long pipe assembly which is supported at its upper end by the hull of the floating facility. Cold water flows to the facility from deep in the ocean. The pipe assembly comprises an elongate pipe construction and a weight connected to the lower end of the construction by a line of selected length. A floatation collar is connected to the construction at its upper end to cause the construction to have positive buoyancy and a center of buoyancy closer to the upper end of the construction than its center of mass. The weight renders the entire pipe assembly negatively buoyant. In the event that support of the pipe assembly should be lost, as by release of the assembly from the facility hull in an emergency, the assembly sinks to the ocean floor where it is moored by the weight. The pipe construction floats submerged above the ocean floor in a substantially vertical attitude which facilitates recovery of the assembly.

  16. Pneumatic soil removal tool

    DOEpatents

    Neuhaus, J.E.

    1992-10-13

    A soil removal tool is provided for removing radioactive soil, rock and other debris from the bottom of an excavation, while permitting the operator to be located outside of a containment for that excavation. The tool includes a fixed jaw, secured to one end of an elongate pipe, which cooperates with a movable jaw pivotably mounted on the pipe. Movement of the movable jaw is controlled by a pneumatic cylinder mounted on the pipe. The actuator rod of the pneumatic cylinder is connected to a collar which is slidably mounted on the pipe and forms part of the pivotable mounting assembly for the movable jaw. Air is supplied to the pneumatic cylinder through a handle connected to the pipe, under the control of an actuator valve mounted on the handle, to provide movement of the movable jaw. 3 figs.

  17. Pneumatic soil removal tool

    DOEpatents

    Neuhaus, John E.

    1992-01-01

    A soil removal tool is provided for removing radioactive soil, rock and other debris from the bottom of an excavation, while permitting the operator to be located outside of a containment for that excavation. The tool includes a fixed jaw, secured to one end of an elongate pipe, which cooperates with a movable jaw pivotably mounted on the pipe. Movement of the movable jaw is controlled by a pneumatic cylinder mounted on the pipe. The actuator rod of the pneumatic cylinder is connected to a collar which is slidably mounted on the pipe and forms part of the pivotable mounting assembly for the movable jaw. Air is supplied to the pneumatic cylinder through a handle connected to the pipe, under the control of an actuator valve mounted on the handle, to provide movement of the movable jaw.

  18. 24 CFR 3280.605 - Joints and connections.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... assembled for tightness. Pipe threads shall be fully engaged with the threads of the fitting. Plastic pipe... standard. Pipe ends shall be reamed out to size of bore. All burrs, chips, cutting oil and foreign matter..., made with solder having not more than 0.2 percent lead. (4) Plastic pipe, fittings and joints. Plastic...

  19. 24 CFR 3280.611 - Vents and venting.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... drain piping for each toilet shall be vented by a 11/2 inch minimum diameter vent or rectangular vent of..., connected to the toilet drain by one of the following methods: (i) A 11/2 inch diameter (min.) individual vent pipe or equivalent directly connected to the toilet drain within the distance allowed in § 3280...

  20. Turbine-Driven Pipe-Cleaning Brush

    NASA Technical Reports Server (NTRS)

    Werlink, Rudy J.; Rowell, David E.

    1994-01-01

    Simple pipe-cleaning device includes small turbine wheel axially connected, by standoff, to circular brush. Turbine wheel turns on hub bearing attached to end of upstream cable. Turbine-and-brush assembly inserted in pipe with cable trailing upstream and brush facing downstream. Water or cleaning solution pumped through pipe. Cable held at upstream end, so it holds turbine and brush in pipe at location to be cleaned. Flow in pipe turns turbine, which turns wheel, producing desired cleaning action. In addition to brushing action, device provides even mixing of cleaning solution in pipe.

  1. Quick-Connect/Disconnect Joint For Truss Structures

    NASA Technical Reports Server (NTRS)

    Sprague, Benny B.

    1991-01-01

    Simple connector used for temporary structures and pipes. Truss connector joins and aligns structural members. Consists of two sections, one flanged and other with mating internal groove. When flanged half inserted in groove, moves lever of trigger mechanism upward. Cone then shoots into grooved half. Attached without tools in less than 2 seconds and taken apart just as quickly and easily. Developed for assembling structures in outer space, also useful for temporary terrestrial structures like scaffolds and portable bleachers. With modifications, used to join sections of pipelines carrying liquids or gases.

  2. Centrally activated pipe snubbing system

    DOEpatents

    Cawley, William E.

    1985-01-01

    An electromechanical pipe snubbing system and an electromechanical pipe snubber. In the system, each pipe snubber, in a set of pipe snubbers, has an electromechanical mechanism to lock and unlock the snubber. A sensor, such as a seismometer, measures a quantity related to making a snubber locking or unlocking decision. A control device makes an electrical connection between a power supply and each snubber's electromechanical mechanism to simultaneously lock each snubber when the sensor measurement indicates a snubber locking condition. The control device breaks the connection to simultaneously unlock each snubber when the sensor measurement indicates a snubber unlocking condition. In the snubber, one end of the shaft slides within a bore in one end of a housing. The other end of the shaft is rotatably attached to a pipe; the other end of the housing is rotatively attached to a wall. The snubber's electromechanical mechanism locks the slidable end of the shaft to the housing and unlocks that end from the housing. The electromechanical mechanism permits remote testing and lockup status indication for each snubber.

  3. Downhole tool

    DOEpatents

    Hall, David R.; Muradov, Andrei; Pixton, David S.; Dahlgren, Scott Steven; Briscoe, Michael A.

    2007-03-20

    A double shouldered downhole tool connection comprises box and pin connections having mating threads intermediate mating primary and secondary shoulders. The connection further comprises a secondary shoulder component retained in the box connection intermediate a floating component and the primary shoulders. The secondary shoulder component and the pin connection cooperate to transfer a portion of makeup load to the box connection. The downhole tool may be selected from the group consisting of drill pipe, drill collars, production pipe, and reamers. The floating component may be selected from the group consisting of electronics modules, generators, gyroscopes, power sources, and stators. The secondary shoulder component may comprises an interface to the box connection selected from the group consisting of radial grooves, axial grooves, tapered grooves, radial protrusions, axial protrusions, tapered protrusions, shoulders, and threads.

  4. Mining Security Pipe(TSM)with Underground GPS Global(RSPG)Escape Security Device in Underground Mining

    NASA Astrophysics Data System (ADS)

    Giménez, Rafael Barrionuevo

    2016-06-01

    TSM is escape pipe in case of collapse of terrain. The TSM is a passive security tool placed underground to connect the work area with secure area (mining gallery mainly). TSM is light and hand able pipe made with aramid (Kevlar), carbon fibre, or other kind of new material. The TSM will be placed as a pipe line network with many in/out entrances/exits to rich and connect problem work areas with another parts in a safe mode. Different levels of instrumentation could be added inside such as micro-led escape way suggested, temperature, humidity, level of oxygen, etc.). The open hardware and software like Arduino will be the heart of control and automation system.

  5. Plumbing and Piping: Construction, Supervision, and Inspection. Course of Study.

    ERIC Educational Resources Information Center

    O'Meara, Lester; Turley, John

    This course of study on plumbing and piping is part of a construction, supervision, and inspection series, which provides instructional materials for community or junior college technical courses in the inspection program. Material covered in this volume pertains to: uniform plumbing code; pipes, fittings, supports, and connections; sewer and…

  6. 46 CFR 56.20-15 - Valves employing resilient material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Valves § 56.20-15 Valves employing resilient material. (a) A valve in which the... piping system manifolds; (ii) Isolation valves in cross-connects between two piping systems, at least one...

  7. Acoustic performance of a Herschel Quincke tube modified with an interconnecting pipe

    NASA Astrophysics Data System (ADS)

    Desantes, J. M.; Torregrosa, A. J.; Climent, H.; Moya, D.

    2005-06-01

    The classical two-duct Herschel-Quincke tube is modified by means of an additional pipe connecting both paths. A transfer matrix is obtained for a mesh system with five arbitrary branches and then particularized to the proposed scheme. Experimental attenuation measurements were performed on several prototypes, and the results compared favourably with predictions from the previous theoretical development. Finally, transmission loss contour plots were used to study the influence of the connecting pipe on the resonance frequencies. The results confirm the nontrivial character of the influence observed, and simple relationships are obtained for the general trends.

  8. Flow Energy Piezoelectric Bimorph Nozzle Harvester

    NASA Technical Reports Server (NTRS)

    Walkemeyer, Phillip E. (Inventor); Tosi, Phillipe (Inventor); Corbett, Thomas Gary (Inventor); Hall, Jeffrey L. (Inventor); Lee, Hyeong Jae (Inventor); Arrazola, Alvaro Jose (Inventor); Sherrit, Stewart (Inventor); Colonius, Tim (Inventor); Kim, Namhyo (Inventor); Sun, Kai (Inventor)

    2016-01-01

    A flow energy harvesting device having a harvester pipe includes a flow inlet that receives flow from a primary pipe, a flow outlet that returns the flow into the primary pipe, and a flow diverter within the harvester pipe having an inlet section coupled to the flow inlet, a flow constriction section coupled to the inlet section and positioned at a midpoint of the harvester pipe and having a spline shape with a substantially reduced flow opening size at a constriction point along the spline shape, and an outlet section coupled to the constriction section. The harvester pipe may further include a piezoelectric structure extending from the inlet section through the constriction section and point such that the fluid flow past the constriction point results in oscillatory pressure amplitude inducing vibrations in the piezoelectric structure sufficient to cause a direct piezoelectric effect and to generate electrical power for harvesting.

  9. System-level Analysis of Chilled Water Systems Aboard Naval Ships

    DTIC Science & Technology

    2015-06-24

    developed one-dimensional partial differen- tial equation models that simulate time-dependent hy- drodynamics and heat transport in a piping network...Thermal zone extents. 2) Piping path and diameter. 3) Specifications and locations of chillers, heat ex- changers, pumps and valves. The framework of the... pipes and provides boundary conditions for the end of the connecting pipes . Pumps, valves, bends and heat exchangers are such components. These

  10. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  11. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  12. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  13. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  14. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  15. Mixing at double-Tee junctions with unequal pipe sizes in ...

    EPA Pesticide Factsheets

    Pipe flow mixing with various solute concentrations and flow rates at pipe junctions is investigated. The degree of mixing affects the spread of contaminants in a water distribution system. Many studies have been conducted on the mixing at the cross junctions. Yet a few have focused on double-Tee junctions of unequal pipe sizes. To investigate the solute mixing at double-Tee junctions with unequal pipe sizes, a series of experiments were conducted in a turbulent regime (Re=12500–50000) with different Reynolds number ratios and connecting pipe lengths. It is shown that dimensionless outlet concentrations depended on mixing mechanism at the impinging interface of junctions. Junction with a larger pipe size ratio is associated with more complete mixing. The inlet Reynolds number ratio affects mixing more strongly than the outlet Reynolds number ratio. Furthermore, the dimensionless connecting pipe length in a double-Tee played an important and complicated role in the flow mixing. Based on these results, two-dimensional isopleth maps were developed for the calculation of normalized north outlet concentration. This journal article is to communicate the research results on pipe juncture mixing, a widespread and important phenomena in distribution system water quality analysis. The research outcome improves EPANET modeling capability for safe water supplies. In addition, the research is one of the outputs from the EPA-MOST bilateral cooperative research Project #1

  16. Rolling-cuff flexible bellows

    DOEpatents

    Lambert, D.R.

    1982-09-27

    A flexible connector apparatus used to join two stiff non-deformable members, such as piping, is described. The apparatus is provided with one or more flexible sections or assemblies each utilizing a bellows of a rolling cuff type connected between two ridge members, with the bellows being supported by a back-up ring, such that only the curved end sections of the bellows are unsupported. Thus, the bellows can be considered as being of a tube-shaped configuration and thus have high pressure resistance. The components of the flexible apparatus are sealed or welded one to another such that it is fluid tight.

  17. 49 CFR 173.318 - Cryogenic liquids in cargo tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....338-15). (3) The jacket covering the insulation on a tank used to transport a cryogenic liquid must be... devices for piping hose and vacuum-insulated jackets. (i) Each portion of connected liquid piping or hose... tank, piping, or operating personnel. (ii) On a vacuum-insulated cargo tank the jacket must be...

  18. 46 CFR 151.50-84 - Sulfur dioxide.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... piping or manifold that carriers cargo liquid, except vapor lines connected to a common header, and (11... must be removed and cargo transfer piping must be disconnected at the cargo tanks. After the cargo piping is disconnected, both ends of the line must be plugged or fitted with blind flanges. [CGD 80-001...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kornfeldt, H.; Bjoerk, K.O.; Ekstroem, P.

    The protection against dynamic effects in connection with potential pipe breaks has been implemented in different ways in the development of BWR reactor designs. First-generation plant designs reflect code requirements in effect at that time which means that no piping restraint systems were designed and built into those plants. Modern designs have, in contrast, implemented full protection against damage in connection with postulated pipe breaks, as required in current codes and regulations. Moderns standards and current regulatory demands can be met for the older plants by backfitting pipe whip restraint hardware. This could lead to several practical difficulties as thesemore » installations were not anticipated in the original plant design and layout. Meeting the new demands by analysis would in this situation have great advantages. Application of leak-before-break criteria gives an alternative opportunity of meeting modem standards in reactor safety design. Analysis takes into account data specific to BWR primary system operation, actual pipe material properties, piping loads and leak detection capability. Special attention must be given to ensure that the data used reflects actual plant conditions.« less

  20. Experimental study of geysers through a vent pipe connected to flowing sewers.

    PubMed

    Huang, Biao; Wu, Shiqiang; Zhu, David Z; Schulz, Harry E

    2017-04-01

    Geysers of air-water mixtures in urban drainage systems is receiving considerable attention due to public safety concerns. However, the geyser formation process and its relation with air release from pressurized pipes are still relatively little known. A large-scale physical model, that consisted of a main tunnel with a diameter of 270 mm and a length of 25 m connecting two reservoirs and a vertical vent pipe, was established to investigate geyser evolution and pressure transients. Experimental results including dynamic pressure data and high speed videos were analysed in order to characterize geysering flow through the vent pipe. Pressure transients were observed during geysering events. Their amplitudes were found to be about three times the driving pressure head and their periods were close to the classic surge tank predictions. The influence of flow rate and vent pipe size were examined: geyser heights and pressure peaks decreased for small flow rate and large diameter vent pipe. It is suggested that geyser heights are related with the pressure head and the density of the air-water mixture.

  1. 46 CFR 56.85-15 - Postheat treatment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... salt water piping systems used in tank cleaning operations; and, (2) Gas supply piping of carbon or carbon molybdenum steel used in gas turbines. (c) All complicated connections including manifolds shall...

  2. 46 CFR 56.85-15 - Postheat treatment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... salt water piping systems used in tank cleaning operations; and, (2) Gas supply piping of carbon or carbon molybdenum steel used in gas turbines. (c) All complicated connections including manifolds shall...

  3. 46 CFR 56.85-15 - Postheat treatment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... salt water piping systems used in tank cleaning operations; and, (2) Gas supply piping of carbon or carbon molybdenum steel used in gas turbines. (c) All complicated connections including manifolds shall...

  4. Results of Performance Tests Performed on the John Watts WW Casing Connection on 7" Pipe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John D. Watts

    2000-02-01

    Stress Engineering Services (SES) was contracted by Mr. John Watts to test his ''WW'' threaded connection developed for oilfield oil and gas service. This work was a continuation of testing performed by SES as reported in August of 1999. The connection design tested was identified as ''WW''. The samples were all integral (no coupled connections) and contained a wedge thread form with 90{sup o} flank angles relative to the pipe centerline. The wedge thread form is a variable width thread that primarily engages on the flanks. This thread form provides very high torque capacity and good stabbing ability and makeup.more » The test procedure selected for one of the samples was the newly written ISO 13679 procedure for full scale testing of casing and tubing connections, which is currently going through the ISO acceptance process. The ISO procedure requires a variety of tests that includes makeup/breakout testing, internal gas sealability/external water sealability testing with axial tension, axial compression, bending, internal gas thermal cycle tests and limit load (failure) tests. This test procedure was performed with one sample. Four samples were tested to failure. Table 1 contains a summary of the tasks performed by SES. The project started with the delivery of test samples by Mr. Watts. Pipe from the previous round of tests was used for the new samples. Figure 1 shows the structural and sealing results relative to the pipe body. Sample 1 was used to determine the torque capacity of the connection. Torque was applied to the capacity of SES's equipment which was 28,424 ft-lbs. From this, an initial recommended torque range of 7,200 to 8,800 ft-lbs. was selected. The sample was disassembled and while there was no galling observed in the threads, the end of the pin had collapsed inward. Sample 2 received three makeups. Breakouts 1 and 2 also had collapsing of the pin end, with no thread galling. From these make/breaks, it was decided to reduce the amount of lubricant applied to the connection by applying it to the box or pin only and reducing the amount applied. Samples 3 and 4 received one makeup only. Sample 5 initially received two make/breaks to test for galling resistance before final makeup, No galling was observed. Later, three additional make/breaks were performed with no pin end collapse and galling over 1/2 a thread occurring on one of the breakouts. During the make/break tests, the stabbing and hand tight makeup of the WW connection was found to be very easy and trouble free. There was no tendency to crossthread, even when stabbed at an angle, and it screwed together very smoothly up to hand tight. During power tight makeup, there was no heat generated in the box (as checked by hand contact) and no jerkiness associated with any of the makeups or breakouts. Sample 2 was tested in pure compression. The maximum load obtained was 1,051 kips and the connection was beginning to significantly deform as the sample buckled. Actual pipe yield was 1,226 kips. Sample 3 was capped-end pressure tested to failure. The capped-end yield pressure of the pipe was 16,572 psi and the sample began to leak at 12,000 psi. Sample 4 was tested in pure tension. The maximum load obtained was 978 kips and the connection failed by fracture at the pin critical section. Actual pipe yield was 1,226 kips. Sample 5 was tested in combined tension/compression and internal gas pressure. The sample was assembled, setup and tested four times. The first time was with a torque of 7,298 ft-lbs and the connection leaked halfway to ISO Load Point 2 with loads of 693 kips and 4,312 psi. The second time the torque was increased to 14,488 ft-lbs and a leak occurred at 849 kips and 9,400 psi, which was ISO Load Point 2. The third time the makeup torque was again increased, to 20,456 ft-lbs, and a leak occurred at 716 kips and 11,342 psi, ISO Load Point 4. The fourth test was with the same torque as before, 20,617 ft-lbs, and the connection successfully tested up to load step 56, ISO Load Point 6 (second round) before leaking at 354 kips and 11,876 psi. At this point, time and funds prevented additional testing to be performed.« less

  5. ADVANCED CUTTINGS TRANSPORT STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefan Miska; Nicholas Takach; Kaveh Ashenayi

    2004-01-31

    Final design of the mast was completed (Task 5). The mast is consisting of two welded plate girders, set next to each other, and spaced 14-inches apart. Fabrication of the boom will be completed in two parts solely for ease of transportation. The end pivot connection will be made through a single 2-inch diameter x 4 feet-8 inch long 316 SS bar. During installation, hard piping make-ups using Chiksan joints will connect the annular section and 4-inch return line to allow full movement of the mast from horizontal to vertical. Additionally, flexible hoses and piping will be installed to isolatemore » both towers from piping loads and allow recycling operations respectively. Calibration of the prototype Foam Generator Cell has been completed and experiments are now being conducted. We were able to generate up to 95% quality foam. Work is currently underway to attach the Thermo-Haake RS300 viscometer and install a view port with a microscope to measure foam bubble size and bubble size distribution. Foam rheology tests (Task 13) were carried out to evaluate the rheological properties of the proposed foam formulation. After successful completion of the first foam test, two sets of rheological tests were conducted at different foam flow rates while keeping other parameters constant (100 psig, 70F, 80% quality). The results from these tests are generally in agreement with the previous foam tests done previously during Task 9. However, an unanticipated observation during these tests was that in both cases, the frictional pressure drop in 2 inch pipe was lower than that in the 3 inch and 4 inch pipes. We also conducted the first foam cuttings transport test during this quarter. Experiments on aerated fluids without cuttings have been completed in ACTF (Task 10). Gas and liquid were injected at different flow rates. Two different sets of experiments were carried out, where the only difference was the temperature. Another set of tests was performed, which covered a wide range of pressure and temperature. Several parameters were measured during these tests including differential pressure and mixture density in the annulus. Flow patterns during the aerated fluids test have been observed through the view port in the annulus and recorded by a video camera. Most of the flow patterns were slug flow. Further increase in gas flow rate changed the wavy flow pattern to slug flow. At this stage, all of the planned cuttings transport tests have been completed. The results clearly show that temperature significantly affects the cuttings transport efficiency of aerated muds, in addition to the liquid flow rate and gas liquid ratio (GLR). Since the printed circuit board is functioning (Task 11) with acceptable noise level we were able to conduct several tests. We used the newly designed pipe test section to conduct tests. We tested to verify that we can distinguish between different depths of sand in a static bed of sand in the pipe section. The results indicated that we can distinguish between different sand levels. We tested with water, air and a mix of the two mediums. Major modifications (installation of magnetic flow meter, pipe fittings and pipelines) to the dynamic bubble characterization facility (DTF, Task 12) were completed. An Excel program that allows obtaining the desired foam quality in DTF was developed. The program predicts the foam quality by recording the time it takes to pressurize the loop with nitrogen.« less

  6. 24 CFR 3280.605 - Joints and connections.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... watertight for the pressures required under testing procedures. (1) Assembling of pipe. All joints and... or welding sockets of each fitting. Pipe threads and slip joints shall not be wrapped with string...

  7. Design guidelines for avoiding thermo-acoustic oscillations in helium piping systems

    DOE PAGES

    Gupta, Prabhat Kumar; Rabehl, Roger

    2015-04-02

    Thermo-acoustic oscillations are a commonly observed phenomenon in helium cryogenic systems, especially in tubes connecting hot and cold areas. The open ends of these tubes are connected to the lower temperature (typically at 4.5 K), and the closed ends of these tubes are connected to the high temperature (300 K). Cryogenic instrumentation installations provide ideal conditions for these oscillations to occur due to the steep temperature gradient along the tubing. These oscillations create errors in measurements as well as an undesirable heat load to the system. The work presented here develops engineering guidelines to design oscillation-free helium piping. This workmore » also studies the effect of different piping inserts and shows how the proper geometrical combinations have to be chosen to avoid thermo-acoustic oscillations. The effect of an 80 K intercept is also studied and shows that thermo-oscillations can be dampened by placing the intercept at an appropriate location. As a result, the design of helium piping based on the present work is also verified with the experimental results available in open literature.« less

  8. 78 FR 36179 - Carlsbad Municipal Water District; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size of the... proposed 80-foot-long, 16-inch-diameter intake pipe; (3) a proposed 18- foot by 18-foot powerhouse..., 50-foot discharge pipe, connecting to existing 42-inch diameter and 10- inch diameter pipes conveying...

  9. Viscous Flow through Pipes of Various Cross-Sections

    ERIC Educational Resources Information Center

    Lekner, John

    2007-01-01

    An interesting variety of pipe cross-sectional shapes can be generated, for which the Navier-Stokes equations can be solved exactly. The simplest cases include the known solutions for elliptical and equilateral triangle cross-sections. Students can find pipe cross-sections from solutions of Laplace's equation in two dimensions, and then plot the…

  10. Downhole pipe selection for acoustic telemetry

    DOEpatents

    Drumheller, Douglas S.

    1995-01-01

    A system for transmitting signals along a downhole string including a plurality of serially connected tubular pipes such as drill or production pipes, a transmitter for transmitting a signal along the string and a receiver for receiving the signal placed along the string at a location spaced from said transmitting means, wherein the pipes between the transmitter and the receiver are ordered according to length of tube to minimize loss of signal from said transmitter to said receiver.

  11. 49 CFR 192.155 - Welded branch connections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... not reduced, taking into account the stresses in the remaining pipe wall due to the opening in the pipe or header, the shear stresses produced by the pressure acting on the area of the branch opening...

  12. 49 CFR 192.155 - Welded branch connections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... not reduced, taking into account the stresses in the remaining pipe wall due to the opening in the pipe or header, the shear stresses produced by the pressure acting on the area of the branch opening...

  13. 49 CFR 192.155 - Welded branch connections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... not reduced, taking into account the stresses in the remaining pipe wall due to the opening in the pipe or header, the shear stresses produced by the pressure acting on the area of the branch opening...

  14. 49 CFR 192.155 - Welded branch connections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... not reduced, taking into account the stresses in the remaining pipe wall due to the opening in the pipe or header, the shear stresses produced by the pressure acting on the area of the branch opening...

  15. Branch-pipe-routing approach for ships using improved genetic algorithm

    NASA Astrophysics Data System (ADS)

    Sui, Haiteng; Niu, Wentie

    2016-09-01

    Branch-pipe routing plays fundamental and critical roles in ship-pipe design. The branch-pipe-routing problem is a complex combinatorial optimization problem and is thus difficult to solve when depending only on human experts. A modified genetic-algorithm-based approach is proposed in this paper to solve this problem. The simplified layout space is first divided into threedimensional (3D) grids to build its mathematical model. Branch pipes in layout space are regarded as a combination of several two-point pipes, and the pipe route between two connection points is generated using an improved maze algorithm. The coding of branch pipes is then defined, and the genetic operators are devised, especially the complete crossover strategy that greatly accelerates the convergence speed. Finally, simulation tests demonstrate the performance of proposed method.

  16. Design Issues Affecting Pipings Associated with a New Moisture Separator Reheater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hyung-Keun, Kim; Jae-Kyoung, Cho

    2006-07-01

    This paper summarizes the piping design effects on a New Moisture Separator Reheater (MSR) in Shin-Kori Nuclear Power Plant Units 1 and 2 (SKN 1 and 2) being under the construction in Korea. This SKN 1 and 2 has the same arrangement of a Turbine-Generator set as one of Korea Standard Nuclear Plant Units ( OPR 1000 ) in commercial operation. The Turbine-Generator Supplier has developed a new Moisture Separator Reheater which has first and second stage heating steam supply connections respectively, at both ends of the shell side of the vessel in comparison to MSR of OPR 1000 whichmore » has first and second stage heating steam supply connections at only one end. The different locations of reheaters in MSR cause changes in the associated pipings such as 2. stage reheater heating steam, 2. stage reheater drain, shell drain, drain tank location and tank condensate drainage pipings. (authors)« less

  17. Pipe weld crown removal device

    DOEpatents

    Sword, Charles K.; Sette, Primo J.

    1992-01-01

    A device is provided for grinding down the crown of a pipe weld joining aligned pipe sections so that the weld is substantially flush with the pipe sections joined by the weld. The device includes a cage assembly comprising a pair of spaced cage rings adapted to be mounted for rotation on the respective pipe sections on opposite sides of the weld, a plurality of grinding wheels, supported by the cage assembly for grinding down the crown of the weld, and a plurality of support shafts, each extending longitudinally along the joined pipe sections, parallel thereto, for individually mounting respective grinding wheels. Each end of the support shafts is mounted for rotation in a bearing assembly housed within a radially directed opening in a corresponding one of the cage rings so as to provide radial movement of the associated shaft, and thus of the associated grinding wheel, towards and away from the weld. A first drive sprocket provides rotation of the cage assembly around the pipe sections while a second drive unit, driven by a common motor, provides rotation of the grinding wheels.

  18. Downhole pipe selection for acoustic telemetry

    DOEpatents

    Drumheller, D.S.

    1995-12-19

    A system is described for transmitting signals along a downhole string including a plurality of serially connected tubular pipes such as drill or production pipes, a transmitter for transmitting a signal along the string and a receiver for receiving the signal placed along the string at a location spaced from said transmitting means, wherein the pipes between the transmitter and the receiver are ordered according to length of tube to minimize loss of signal from said transmitter to said receiver. 7 figs.

  19. Vacuum chamber for containing particle beams

    DOEpatents

    Harvey, A.

    1985-11-26

    A vacuum chamber for containing a charged particle beam in a rapidly changing magnetic environment comprises a ceramic pipe with conducting strips oriented along the longitudinal axis of the pipe and with circumferential conducting bands oriented perpendicular to the longitudinal axis but joined with a single longitudinal electrical connection. When both strips and bands are on the outside of the ceramic pipe, insulated from each other, a high-resistance conductive layer such as nickel can be coated on the inside of the pipe.

  20. Locating hot and cold-legs in a nuclear powered steam generation system

    DOEpatents

    Ekeroth, D.E.; Corletti, M.M.

    1993-11-16

    A nuclear reactor steam generator includes a reactor vessel for heating water and a steam generator with a pump casing at the lowest point on the steam generator. A cold-leg pipe extends horizontally between the steam generator and the reactor vessel to return water from the steam generator to the reactor vessel. The bottom of the cold-leg pipe is at a first height above the bottom of the reactor vessel. A hot-leg pipe with one end connected to the steam generator and a second end connected to the reactor vessel has a first pipe region extending downwardly from the steam generator to a location between the steam generator and the reactor vessel at which a bottom of the hot-leg pipe is at a second height above the bottom of the reactor vessel. A second region extends from that location in a horizontal direction at the second height to the point at which the hot-leg pipe connects to the reactor vessel. A pump is attached to the casing at a location below the first and second heights and returns water from the steam generator to the reactor vessel over the cold-leg. The first height is greater than the second height and the bottom of the steam generator is at a height above the bottom of the reactor vessel that is greater than the first and second heights. A residual heat recovery pump is below the hot-leg and has an inlet line from the hot-leg that slopes down continuously to the pump inlet. 2 figures.

  1. Locating hot and cold-legs in a nuclear powered steam generation system

    DOEpatents

    Ekeroth, Douglas E.; Corletti, Michael M.

    1993-01-01

    A nuclear reactor steam generator includes a reactor vessel for heating water and a steam generator with a pump casing at the lowest point on the steam generator. A cold-leg pipe extends horizontally between the steam generator and the reactor vessel to return water from the steam generator to the reactor vessel. The bottom of the cold-leg pipe is at a first height above the bottom of the reactor vessel. A hot-leg pipe with one end connected to the steam generator and a second end connected to the reactor vessel has a first pipe region extending downwardly from the steam generator to a location between the steam generator and the reactor vessel at which a bottom of the hot-leg pipe is at a second height above the bottom of the reactor vessel. A second region extends from that location in a horizontal direction at the second height to the point at which the hot-leg pipe connects to the reactor vessel. A pump is attached to the casing at a location below the first and second heights and returns water from the steam generator to the reactor vessel over the cold-leg. The first height is greater than the second height and the bottom of the steam generator is at a height above the bottom of the reactor vessel that is greater than the first and second heights. A residual heat recovery pump is below the hot-leg and has an inlet line from the hot-leg that slopes down continuously to the pump inlet.

  2. The flows structure in unsteady gas flow in pipes with different cross-sections

    NASA Astrophysics Data System (ADS)

    Plotnikov, Leonid; Nevolin, Alexandr; Nikolaev, Dmitrij

    2017-10-01

    The results of numerical simulation and experimental study of the structure of unsteady flows in pipes with different cross sections are presented in the article. It is shown that the unsteady gas flow in a circular pipe is axisymmetric without secondary currents. Steady vortex structures (secondary flows) are observed in pipes with cross sections in the form of a square and an equilateral triangle. It was found that these secondary flows have a significant impact on gas flows in pipes of complex configuration. On the basis of experimental researches it is established that the strong oscillatory phenomena exist in the inlet pipe of the piston engine arising after the closing of the intake valve. The placement of the profiled plots (with a cross section of a square or an equilateral triangle) in the intake pipe leads to the damping of the oscillatory phenomena and a more rapid stabilization of pulsating flow. This is due to the stabilizing effect of the vortex structures formed in the corners of this configuration.

  3. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... leakage when connected. (4) Piping must be protected from damage due to thermal expansion and contraction... smallest practicable space and protected from damage as required by § 178.338-10. (9) When a pressure...

  4. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... leakage when connected. (4) Piping must be protected from damage due to thermal expansion and contraction... smallest practicable space and protected from damage as required by § 178.338-10. (9) When a pressure...

  5. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... leakage when connected. (4) Piping must be protected from damage due to thermal expansion and contraction... smallest practicable space and protected from damage as required by § 178.338-10. (9) When a pressure...

  6. 49 CFR 178.338-8 - Pressure relief devices, piping, valves, and fittings.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... leakage when connected. (4) Piping must be protected from damage due to thermal expansion and contraction... smallest practicable space and protected from damage as required by § 178.338-10. (9) When a pressure...

  7. 46 CFR 56.50-85 - Tank-vent piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the tanks to vent pipes. (2) Tanks having a comparatively small surface, such as fuel oil settling... 46 Shipping 2 2010-10-01 2010-10-01 false Tank-vent piping. 56.50-85 Section 56.50-85 Shipping... APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-85 Tank-vent piping. (a) This section...

  8. 22. Power plant engine pipingcompressed air piping diagram and sections, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Power plant engine piping-compressed air piping diagram and sections, sheet 81 of 130 - Naval Air Station Fallon, Power Plant, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV

  9. 49 CFR 192.111 - Design factor (F) for steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Design factor (F) for steel pipe. 192.111 Section...) for steel pipe. (a) Except as otherwise provided in paragraphs (b), (c), and (d) of this section, the... less must be used in the design formula in § 192.105 for steel pipe in Class 1 locations that: (1...

  10. 49 CFR 192.111 - Design factor (F) for steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design factor (F) for steel pipe. 192.111 Section...) for steel pipe. (a) Except as otherwise provided in paragraphs (b), (c), and (d) of this section, the... less must be used in the design formula in § 192.105 for steel pipe in Class 1 locations that: (1...

  11. 49 CFR 192.111 - Design factor (F) for steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Design factor (F) for steel pipe. 192.111 Section...) for steel pipe. (a) Except as otherwise provided in paragraphs (b), (c), and (d) of this section, the... less must be used in the design formula in § 192.105 for steel pipe in Class 1 locations that: (1...

  12. 49 CFR 192.111 - Design factor (F) for steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design factor (F) for steel pipe. 192.111 Section...) for steel pipe. (a) Except as otherwise provided in paragraphs (b), (c), and (d) of this section, the... less must be used in the design formula in § 192.105 for steel pipe in Class 1 locations that: (1...

  13. Fuel injection staged sectoral combustor for burning low-BTU fuel gas

    DOEpatents

    Vogt, Robert L.

    1981-01-01

    A high-temperature combustor for burning low-BTU coal gas in a gas turbine is described. The combustor comprises a plurality of individual combustor chambers. Each combustor chamber has a main burning zone and a pilot burning zone. A pipe for the low-BTU coal gas is connected to the upstream end of the pilot burning zone; this pipe surrounds a liquid fuel source and is in turn surrounded by an air supply pipe; swirling means are provided between the liquid fuel source and the coal gas pipe and between the gas pipe and the air pipe. Additional preheated air is provided by counter-current coolant air in passages formed by a double wall arrangement of the walls of the main burning zone communicating with passages of a double wall arrangement of the pilot burning zone; this preheated air is turned at the upstream end of the pilot burning zone through swirlers to mix with the original gas and air input (and the liquid fuel input when used) to provide more efficient combustion. One or more fuel injection stages (second stages) are provided for direct input of coal gas into the main burning zone. The countercurrent air coolant passages are connected to swirlers surrounding the input from each second stage to provide additional oxidant.

  14. Fuel injection staged sectoral combustor for burning low-BTU fuel gas

    DOEpatents

    Vogt, Robert L.

    1985-02-12

    A high-temperature combustor for burning low-BTU coal gas in a gas turbine is described. The combustor comprises a plurality of individual combustor chambers. Each combustor chamber has a main burning zone and a pilot burning zone. A pipe for the low-BTU coal gas is connected to the upstream end of the pilot burning zone: this pipe surrounds a liquid fuel source and is in turn surrounded by an air supply pipe: swirling means are provided between the liquid fuel source and the coal gas pipe and between the gas pipe and the air pipe. Additional preheated air is provided by counter-current coolant air in passages formed by a double wall arrangement of the walls of the main burning zone communicating with passages of a double wall arrangement of the pilot burning zone: this preheated air is turned at the upstream end of the pilot burning zone through swirlers to mix with the original gas and air input (and the liquid fuel input when used) to provide more efficient combustion. One or more fuel injection stages (second stages) are provided for direct input of coal gas into the main burning zone. The countercurrent air coolant passages are connected to swirlers surrounding the input from each second stage to provide additional oxidant.

  15. Connectivist Communication Networks

    ERIC Educational Resources Information Center

    Waßmann, Ingolf; Nicolay, Robin; Martens, Alke

    2016-01-01

    Facing the challenges of the digital age concerning lifelong learning, this contribution presents an approach to dynamically establish Connectivist communication networks. According the statement "the pipe is more important than the content within the pipe" by Georg Siemens, learning in digital age includes the connection of people to…

  16. 40 CFR 143.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... public of piped water for human consumption, if such a system has at least fifteen service connections or... corrosion of piping and plumbing caused by water quality, are excluded from this definition. [44 FR 42198... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL...

  17. Pipe connector

    DOEpatents

    Sullivan, Thomas E.; Pardini, John A.

    1978-01-01

    A safety test facility for testing sodium-cooled nuclear reactor components includes a reactor vessel and a heat exchanger submerged in sodium in the tank. The reactor vessel and heat exchanger are connected by an expansion/deflection pipe coupling comprising a pair of coaxially and slidably engaged tubular elements having radially enlarged opposed end portions of which at least a part is of spherical contour adapted to engage conical sockets in the ends of pipes leading out of the reactor vessel and in to the heat exchanger. A spring surrounding the pipe coupling urges the end portions apart and into engagement with the spherical sockets. Since the pipe coupling is submerged in liquid a limited amount of leakage of sodium from the pipe can be tolerated.

  18. Evaluation of Neutron Elastic Scatter (NES) technique for detection of graphitic corrosion in gas cast iron pipe. Final report, March 1996-April 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Charatis, G.; Hugg, E.; McEllistrem, M.

    1997-04-01

    PENETRON, Inc., in two phases, demonstrated the effectiveness of its Neutron elastic Scatter (NES) techniques in detecting the change in the carbon weight percentage (CWt%) as a measure of corrosion in gray cast iron pipe. In Phase I, experiments were performed with synthetic standards supplied by IIT Research Institute (IITRI) to test the applicability of the NES techniques. Irradiation experiments performed at the University of Kentucky showed that CWt% could be detected, ranging from 1.6% to 13%, within an uncertainty of around 4%. In Phase II, experiments were performed on seven (7) corroded pipe sections supplied by MichCon. Tests weremore » made on pipe sliced lengthwise into quarter sections, and in re-assembled whole pipe sections. X-ray films of the quarter sections indicated probable areas of corrosion for each quarter section.« less

  19. The plumbing of the global biological pump: Efficiency control through leaks, pathways, and time scales

    NASA Astrophysics Data System (ADS)

    Pasquier, Benoît; Holzer, Mark

    2016-08-01

    We systematically quantify the pathways and time scales that set the efficiency, Ebio, of the global biological pump by applying Green-function-based diagnostics to a data-assimilated phosphorus cycle embedded in a jointly assimilated ocean circulation. We consider "bio pipes" that consist of phosphorus paths that connect specified regions of last biological utilization with regions where regenerated phosphate first reemerges into the euphotic zone. The bio pipes that contribute most to Ebio connect the Eastern Equatorial Pacific (EEqP) and Equatorial Atlantic to the Southern Ocean ((21 ± 3)% of Ebio), as well as the Southern Ocean to itself ((15 ± 3)% of Ebio). The bio pipes with the largest phosphorus flow rates connect the EEqP to itself and the subantarctic Southern Ocean to itself. The global mean sequestration time of the biological pump is 130 ± 70 years, while the sequestration time of the bio pipe from anywhere to the Antarctic region of the Southern Ocean is 430 ± 30 years. The distribution of phosphorus flowing within a given bio pipe is quantified by its transit-time partitioned path density. For the largest bio pipes, ˜1/7 of their phosphorus is carried by thermocline paths with transit times less than ˜300-400 years, while ˜4/7 of their phosphorus is carried by abyssal paths with transit times exceeding ˜700 years. The path density reveals that Antarctic Intermediate Water carries about a third of the regenerated phosphate last utilized in the EEqP that is destined for the Southern Ocean euphotic zone. The Southern Ocean is where (62 ± 2)% of the regenerated inventory and (69 ± 1)% of the preformed inventory first reemerge into the euphotic zone.

  20. Long-Term Behavior of Simulated Partial Lead Service Line Replacements

    PubMed Central

    St. Clair, Justin; Cartier, Clement; Triantafyllidou, Simoni; Clark, Brandi; Edwards, Marc

    2016-01-01

    Abstract In this 48-month pilot study, long-term impacts of copper:lead galvanic connections on lead release to water were assessed without confounding differences in pipe exposure prehistory or disturbances arising from cutting lead pipe. Lead release was tracked from three lead service line configurations, including (1) 100% lead, (2) traditional partial replacement with 50% copper upstream of 50% lead, and (3) 50% lead upstream of 50% copper as a function of flow rate, connection types, and sampling methodologies. Elevated lead from galvanic corrosion worsened with time, with 140% more lead release from configurations representing traditional partial replacement configurations at 14 months compared to earlier data in the first 8 months. Even when sampled consistently at moderate flow rate (8 LPM) and collecting all water passing through service lines, conditions representing traditional partial service line configurations were significantly worse (≈40%) when compared to 100% lead pipe. If sampled at a high flow rate (32 LPM) and collecting 2 L samples from service lines, 100% of samples collected from traditional partial replacement configurations exceeded thresholds posing an acute health risk versus a 0% risk for samples from 100% lead pipe. Temporary removal of lead accumulations near Pb:Cu junctions and lead deposits from other downstream plastic pipes reduced risk of partial replacements relative to that observed for 100% lead. When typical brass compression couplings were used to connect prepassivated lead pipes, lead release spiked up to 10 times higher, confirming prior concerns raised at bench and field scale regarding adverse impacts of crevices and service line disturbances on lead release. To quantify semirandom particulate lead release from service lines in future research, whole-house filters have many advantages compared to other approaches. PMID:26989344

  1. Development and optimization of water treatment reactors using TiO2-modified polymer beads with a refractive index identical to that of water

    NASA Astrophysics Data System (ADS)

    Myoga, Arata; Iwashita, Ryutaro; Unno, Noriyuki; Satake, Shin-ichi; Taniguchi, Jun; Yuki, Kazuhisa; Seki, Yohji

    2018-03-01

    Various water purification reactors were constructed using beads of TiO2-coated MEXFLON, which is a fluoropolymer exhibiting a refractive index identical to that of water. The performance of these reactors was evaluated in a recirculation experiment utilizing an aqueous solution of methylene blue. Reactor pipes (length = 150 mm, internal diameter = 10 mm) were made of a fluorinated ethylene polymer with a refractive index of 1.338 and contained 206-bead clusters. A UV lamp was used to irradiate eight reactor pipes surrounding it. The above-mentioned eight bead-packed pipes were connected both in series and in parallel, and the performances of these two reactor types were compared. A pseudo-first-order rate constant of 0.70 h- 1 was obtained for the series connection, whereas the corresponding value for the parallel connection was 1.5 times smaller, confirming the effectiveness of increasing the reaction surface by employing a larger number of beads.

  2. Development and optimization of water treatment reactors using TiO2-modified polymer beads with a refractive index identical to that of water

    NASA Astrophysics Data System (ADS)

    Myoga, Arata; Iwashita, Ryutaro; Unno, Noriyuki; Satake, Shin-ichi; Taniguchi, Jun; Yuki, Kazuhisa; Seki, Yohji

    2018-06-01

    Various water purification reactors were constructed using beads of TiO2-coated MEXFLON, which is a fluoropolymer exhibiting a refractive index identical to that of water. The performance of these reactors was evaluated in a recirculation experiment utilizing an aqueous solution of methylene blue. Reactor pipes (length = 150 mm, internal diameter = 10 mm) were made of a fluorinated ethylene polymer with a refractive index of 1.338 and contained 206-bead clusters. A UV lamp was used to irradiate eight reactor pipes surrounding it. The above-mentioned eight bead-packed pipes were connected both in series and in parallel, and the performances of these two reactor types were compared. A pseudo-first-order rate constant of 0.70 h- 1 was obtained for the series connection, whereas the corresponding value for the parallel connection was 1.5 times smaller, confirming the effectiveness of increasing the reaction surface by employing a larger number of beads.

  3. The behavior of enclosed-type connection of drill pipes during percussive drilling

    NASA Astrophysics Data System (ADS)

    Shadrina, A.; Saruev, L.

    2015-11-01

    Percussion drilling is the efficient method to drill small holes (≥ 70 mm) in medium- hard and harder rocks. The existing types of drill strings for geological explorations are not intended for strain wave energy transfer. The description of the improved design of the drill string having enclosed-type nipple connections is given in this paper presents. This nipple connection is designed to be used in drilling small exploration wells with formation sampling. Experimental findings prove the effectiveness of the enclosed nipple connection in relation to the load distribution in operation. The paper presents research results of the connection behavior under quasistatic loading (compression-tension). Loop diagrams are constructed and analyzed in force-displacement coordinates. Research results are obtained for shear stresses occurred in the nipple connection. A mechanism of shear stress distribution is described for the wave strain propagation over the connecting element. It is shown that in the course of operation the drill pipe tightening reduces the shear stress three times.

  4. Hydrologic connectivity and threshold behavior of hillslopes with fragipans and soil pipe networks

    USDA-ARS?s Scientific Manuscript database

    Many concepts have been proposed to explain hydrologic connectivity of hillslopes with streams. Hydrologic connectivity is most often defined by qualitative assessment of spatial patterns in perched water tables or soil moisture on hillslopes without a direct linkage of the connection of water flow ...

  5. 76 FR 77446 - Airworthiness Directives; Turbomeca S.A. Turboshaft Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... wearing and finally rupture of the P3 air pipe (first section). The loss of P3 air pressure would then... Turbomeca S.A. Arrius 2F turboshaft engines with P3 air pipe (first section) part number (P/N) 0 319 71 918 0, installed. The existing AD currently requires inspections of the P3 air pipe (first section) and...

  6. Passive heat transfer means for nuclear reactors

    DOEpatents

    Burelbach, James P.

    1984-01-01

    An improved passive cooling arrangement is disclosed for maintaining adjacent or related components of a nuclear reactor within specified temperature differences. Specifically, heat pipes are operatively interposed between the components, with the vaporizing section of the heat pipe proximate the hot component operable to cool it and the primary condensing section of the heat pipe proximate the other and cooler component operable to heat it. Each heat pipe further has a secondary condensing section that is located outwardly beyond the reactor confinement and in a secondary heat sink, such as air ambient the containment, that is cooler than the other reactor component. Means such as shrouding normally isolated the secondary condensing section from effective heat transfer with the heat sink, but a sensor responds to overheat conditions of the reactor to open the shrouding, which thereby increases the cooling capacity of the heat pipe. By having many such heat pipes, an emergency passive cooling system is defined that is operative without electrical power.

  7. Flow behaviour and structure of heterogeneous particles-water mixture in horizontal and inclined pipes

    NASA Astrophysics Data System (ADS)

    Vlasák, Pavel; Chára, Zdeněk; Konfršt, Jiří

    2018-06-01

    The effect of slurry velocity and mean concentration of heterogeneous particle-water mixture on flow behaviour and structure in the turbulent regime was studied in horizontal and inclined pipe sections of inner diameter D = 100 mm. The stratified flow pattern of heterogeneous particle-water mixture in the inclined pipe sections was revealed. The particles moved mostly near to the pipe invert. Concentration distribution in ascending and descending vertical pipe sections confirmed the effect of fall velocity on particle-carrier liquid slip velocity and increase of in situ concentration in the ascending pipe section. Slip velocity in two-phase flow, which is defined as the velocity difference between the solid and liquid phase, is one of mechanism of particle movement in two-phase flow. Due to the slip velocity, there is difference between transport and in situ concentrations, and the slip velocity can be determined from comparison of the in situ and transport concentration. For heterogeneous particle-water mixture flow the slip velocity depends on the flow structure.

  8. Disposable sludge dewatering container and method

    DOEpatents

    Cole, Clifford M.

    1993-01-01

    A device and method for preparing sludge for disposal comprising a box with a thin layer of gravel on the bottom and a thin layer of sand on the gravel layer, an array of perforated piping deployed throughout the gravel layer, and a sump in the gravel layer below the perforated piping array. Standpipes connect the array and sump to an external ion exchanger/fine particulate filter and a pump. Sludge is deposited on the sand layer and dewatered using a pump connected to the piping array, topping up with more sludge as the aqueous component of the sludge is extracted. When the box is full and the free standing water content of the sludge is acceptable, the standpipes are cut and sealed and the lid secured to the box.

  9. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  10. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  11. 46 CFR 95.16-60 - System piping installation testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...

  12. 29 CFR 1915.1001 - Asbestos.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACM from straight runs of piping and elbows and other connections with the following specifications... or other device used to prevent collapse of bag during removal shall run continually during the... pressure glove box systems. Negative pressure glove boxes may be used to remove ACM or PACM from pipe runs...

  13. 29 CFR 1915.1001 - Asbestos.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACM from straight runs of piping and elbows and other connections with the following specifications... or other device used to prevent collapse of bag during removal shall run continually during the... pressure glove box systems. Negative pressure glove boxes may be used to remove ACM or PACM from pipe runs...

  14. 29 CFR 1915.1001 - Asbestos.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACM from straight runs of piping and elbows and other connections with the following specifications... or other device used to prevent collapse of bag during removal shall run continually during the... pressure glove box systems. Negative pressure glove boxes may be used to remove ACM or PACM from pipe runs...

  15. 29 CFR 1915.1001 - Asbestos.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACM from straight runs of piping and elbows and other connections with the following specifications... or other device used to prevent collapse of bag during removal shall run continually during the... pressure glove box systems. Negative pressure glove boxes may be used to remove ACM or PACM from pipe runs...

  16. 29 CFR 1915.1001 - Asbestos.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACM from straight runs of piping and elbows and other connections with the following specifications... or other device used to prevent collapse of bag during removal shall run continually during the... pressure glove box systems. Negative pressure glove boxes may be used to remove ACM or PACM from pipe runs...

  17. OPEN PROBLEM: Turbulence transition in pipe flow: some open questions

    NASA Astrophysics Data System (ADS)

    Eckhardt, Bruno

    2008-01-01

    The transition to turbulence in pipe flow is a longstanding problem in fluid dynamics. In contrast to many other transitions it is not connected with linear instabilities of the laminar profile and hence follows a different route. Experimental and numerical studies within the last few years have revealed many unexpected connections to the nonlinear dynamics of strange saddles and have considerably improved our understanding of this transition. The text summarizes some of these insights and points to some outstanding problems in areas where valuable contributions from nonlinear dynamics can be expected.

  18. Passive heat-transfer means for nuclear reactors. [LMFBR

    DOEpatents

    Burelbach, J.P.

    1982-06-10

    An improved passive cooling arrangement is disclosed for maintaining adjacent or related components of a nuclear reactor within specified temperature differences. Specifically, heat pipes are operatively interposed between the components, with the vaporizing section of the heat pipe proximate the hot component operable to cool it and the primary condensing section of the heat pipe proximate the other and cooler component operable to heat it. Each heat pipe further has a secondary condensing section that is located outwardly beyond the reactor confinement and in a secondary heat sink, such as air ambient the containment, that is cooler than the other reactor component. By having many such heat pipes, an emergency passive cooling system is defined that is operative without electrical power.

  19. 46 CFR 108.449 - Piping tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Piping tests. 108.449 Section 108.449 Shipping COAST... Fire Extinguishing Systems Fixed Carbon Dioxide Fire Extinguishing Systems § 108.449 Piping tests. (a) Each test prescribed in (b), (c), and (d) of this section must be performed upon completion of the...

  20. 49 CFR 192.279 - Copper pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Copper pipe. 192.279 Section 192.279 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... Copper pipe. Copper pipe may not be threaded except that copper pipe used for joining screw fittings or...

  1. Conformable apparatus in a drill string

    DOEpatents

    Hall, David R [Provo, UT; Hall, Jr., H. Tracy; Pixton, David S [Lehi, UT; Fox, Joe [Spanish Fork, UT

    2007-08-28

    An apparatus in a drill string comprises an internally upset drill pipe. The drill pipe comprises a first end, a second end, and an elongate tube intermediate the first and second ends. The elongate tube and the ends comprising a continuous an inside surface with a plurality of diameters. A conformable metal tube is disposed within the drill pipe intermediate the ends thereof and terminating adjacent to the ends of the drill pipe. The conformable metal tube substantially conforms to the continuous inside surface of the metal tube. The metal tube may comprise a non-uniform section which is expanded to conform to the inside surface of the drill pipe. The non-uniform section may comprise protrusions selected from the group consisting of convolutions, corrugations, flutes, and dimples. The non-uniform section extends generally longitudinally along the length of the tube. The metal tube may be adapted to stretch as the drill pipes stretch.

  2. Piping inspection carriage having axially displaceable sensor

    DOEpatents

    Zollinger, W.T.; Treanor, R.C.

    1994-12-06

    A pipe inspection instrument carriage is described for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a Y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure. 4 figures.

  3. Piping inspection carriage having axially displaceable sensor

    DOEpatents

    Zollinger, William T.; Treanor, Richard C.

    1994-01-01

    A pipe inspection instrument carriage for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure.

  4. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  5. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  6. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  7. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  8. 40 CFR 60.481a - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... stopping production. Quarter means a 3-month period; the first quarter concludes on the last day of the... means flanged, screwed, or other joined fittings used to connect two pipe lines or a pipe line and a..., separating the compressor cylinder from the crankcase. Double block and bleed system means two block valves...

  9. 49 CFR 192.161 - Supports and anchors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Prevent undue strain on connected equipment; (2) Resist longitudinal forces caused by a bend or offset in the pipe; and (3) Prevent or damp out excessive vibration. (b) Each exposed pipeline must have enough supports or anchors to protect the exposed pipe joints from the maximum end force caused by internal...

  10. 49 CFR 192.161 - Supports and anchors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Prevent undue strain on connected equipment; (2) Resist longitudinal forces caused by a bend or offset in the pipe; and (3) Prevent or damp out excessive vibration. (b) Each exposed pipeline must have enough supports or anchors to protect the exposed pipe joints from the maximum end force caused by internal...

  11. 49 CFR 192.161 - Supports and anchors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Prevent undue strain on connected equipment; (2) Resist longitudinal forces caused by a bend or offset in the pipe; and (3) Prevent or damp out excessive vibration. (b) Each exposed pipeline must have enough supports or anchors to protect the exposed pipe joints from the maximum end force caused by internal...

  12. 49 CFR 192.161 - Supports and anchors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Prevent undue strain on connected equipment; (2) Resist longitudinal forces caused by a bend or offset in the pipe; and (3) Prevent or damp out excessive vibration. (b) Each exposed pipeline must have enough supports or anchors to protect the exposed pipe joints from the maximum end force caused by internal...

  13. 49 CFR 192.161 - Supports and anchors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Prevent undue strain on connected equipment; (2) Resist longitudinal forces caused by a bend or offset in the pipe; and (3) Prevent or damp out excessive vibration. (b) Each exposed pipeline must have enough supports or anchors to protect the exposed pipe joints from the maximum end force caused by internal...

  14. High temperature lined conduits, elbows and tees

    DOEpatents

    De Feo, Angelo; Drewniany, Edward

    1982-01-01

    A high temperature lined conduit comprising, a liner, a flexible insulating refractory blanket around and in contact with the liner, a pipe member around the blanket and spaced therefrom, and castable rigid refractory material between the pipe member and the blanket. Anchors are connected to the inside diameter of the pipe and extend into the castable material. The liner includes male and female slip joint ends for permitting thermal expansion of the liner with respect to the castable material and the pipe member. Elbows and tees of the lined conduit comprise an elbow liner wrapped with insulating refractory blanket material around which is disposed a spaced elbow pipe member with castable refractory material between the blanket material and the elbow pipe member. A reinforcing band is connected to the elbow liner at an intermediate location thereon from which extend a plurality of hollow tubes or pins which extend into the castable material to anchor the lined elbow and permit thermal expansion. A method of fabricating the high temperature lined conduit, elbows and tees is also disclosed which utilizes a polyethylene layer over the refractory blanket after it has been compressed to maintain the refractory blanket in a compressed condition until the castable material is in place. Hot gases are then directed through the interior of the liner for evaporating the polyethylene and setting the castable material which permits the compressed blanket to come into close contact with the castable material.

  15. 46 CFR 154.500 - Cargo and process piping standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Equipment Cargo and Process Piping Systems § 154.500 Cargo and process piping standards. The cargo liquid and vapor piping and process piping systems must meet the requirements in §§ 154.503 through 154.562... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo and process piping standards. 154.500 Section 154...

  16. Space shuttle heat pipe thermal control systems

    NASA Technical Reports Server (NTRS)

    Alario, J.

    1973-01-01

    Heat pipe (HP) thermal control systems designed for possible space shuttle applications were built and tested under this program. They are: (1) a HP augmented cold rail, (2) a HP/phase change material (PCM) modular heat sink and (3) a HP radiating panel for compartment temperature control. The HP augmented cold rail is similar to a standard two-passage fluid cold rail except that it contains an integral, centrally located HP throughout its length. The central HP core helps to increase the local power density capability by spreading concentrated heat inputs over the entire rail. The HP/PCM modular heat sink system consists of a diode HP connected in series to a standard HP that has a PCM canister attached to its mid-section. It is designed to connect a heat source to a structural heat sink during normal operation, and to automatically decouple from it and sink to the PCM whenever structural temperatures are too high. The HP radiating panel is designed to conductively couple the panel feeder HPs directly to a fluid line that serves as a source of waste heat. It is a simple strap-on type of system that requires no internal or external line modifications to distribute the heat to a large radiating area.

  17. 268. Photocopy of drawing (1981 piping drawing by StearnsRoger Incorporated) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    268. Photocopy of drawing (1981 piping drawing by Stearns-Roger Incorporated) ATLAS H CONVERSION; PLANS, SECTIONS, AND DETAILS FOR THE LIQUID OXYGEN PIPING AND THRUST SECTION HEATER DUCT, SHEET 517-P2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 49 CFR Appendix B to Part 192 - Qualification of Pipe

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specification listed in section I of this appendix: (1) Physical (mechanical) properties of pipe, including...). II. Steel pipe of unknown or unlisted specification. A. Bending Properties. For pipe 2 inches (51... impair the strength or tightness of the pipe. D. Tensile Properties. If the tensile properties of the...

  19. 49 CFR Appendix B to Part 192 - Qualification of Pipe

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specification listed in section I of this appendix: (1) Physical (mechanical) properties of pipe, including...). II. Steel pipe of unknown or unlisted specification. A. Bending Properties. For pipe 2 inches (51... impair the strength or tightness of the pipe. D. Tensile Properties. If the tensile properties of the...

  20. 46 CFR 116.970 - Protection against hot piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Protection against hot piping. 116.970 Section 116.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE... ARRANGEMENT Rails and Guards § 116.970 Protection against hot piping. Piping, including valves, pipe fittings...

  1. 46 CFR 116.970 - Protection against hot piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Protection against hot piping. 116.970 Section 116.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE... ARRANGEMENT Rails and Guards § 116.970 Protection against hot piping. Piping, including valves, pipe fittings...

  2. 46 CFR 116.970 - Protection against hot piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Protection against hot piping. 116.970 Section 116.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE... ARRANGEMENT Rails and Guards § 116.970 Protection against hot piping. Piping, including valves, pipe fittings...

  3. 46 CFR 116.970 - Protection against hot piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Protection against hot piping. 116.970 Section 116.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE... ARRANGEMENT Rails and Guards § 116.970 Protection against hot piping. Piping, including valves, pipe fittings...

  4. 46 CFR 116.970 - Protection against hot piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Protection against hot piping. 116.970 Section 116.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE... ARRANGEMENT Rails and Guards § 116.970 Protection against hot piping. Piping, including valves, pipe fittings...

  5. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  6. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  7. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  8. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  9. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  10. 49 CFR 192.59 - Plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Plastic pipe. 192.59 Section 192.59 Transportation... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.59 Plastic pipe. (a) New plastic pipe... specification; and (2) It is resistant to chemicals with which contact may be anticipated. (b) Used plastic pipe...

  11. 49 CFR 192.59 - Plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Plastic pipe. 192.59 Section 192.59 Transportation... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.59 Plastic pipe. (a) New plastic pipe... specification; and (2) It is resistant to chemicals with which contact may be anticipated. (b) Used plastic pipe...

  12. 49 CFR 192.59 - Plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Plastic pipe. 192.59 Section 192.59 Transportation... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.59 Plastic pipe. (a) New plastic pipe... specification; and (2) It is resistant to chemicals with which contact may be anticipated. (b) Used plastic pipe...

  13. 49 CFR 192.59 - Plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Plastic pipe. 192.59 Section 192.59 Transportation... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Materials § 192.59 Plastic pipe. (a) New plastic pipe... specification; and (2) It is resistant to chemicals with which contact may be anticipated. (b) Used plastic pipe...

  14. 33 CFR 158.250 - Standard discharge connection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...

  15. 33 CFR 158.250 - Standard discharge connection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...

  16. 33 CFR 158.250 - Standard discharge connection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...

  17. 33 CFR 158.250 - Standard discharge connection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...

  18. 33 CFR 158.250 - Standard discharge connection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Reception Facilities: Oily Mixtures § 158.250 Standard discharge connection. Each reception facility that received bilge water containing oily mixtures must have a standard discharge connection that— (a) Meets § 155.430 of this subchapter; and (b) Attaches to each hose or pipe that removes bilge water containing...

  19. Final Report For The Erosion And Corrosion Analysis Of Waste Transfer Primary Pipeline Sections From 241-SY Tank Farm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J. S.; Wyrwas, R. B.; Cooke, G. A.

    Three sections of primary transfer pipeline removed from the 241-SY Tank Farm in Hanford's 200 West area, labeled as SN-285, SN-286, and SN-278, were analyzed for the presence and amount of corrosion and erosion on the inside surface of the transfer pipe. All three sections of pipe, ranging in length between 6 and 8 in., were received at the 222-S Laboratory still in the pipe-in-pipe assembly. The annular spaces were filled with urethane foam injected into the pipes for as low as reasonably achievable (ALARA) purposes. The 3-in. primary transfer pipes were first separated from the outer encasement, 6-in. pipes.more » The pipes were cut into small sections, or coupons, based upon the results of a non-destructive pipe wall thickness measurement which used an ultrasonic transducer. Following removal of the foam, the coupons were subjected to a series of analytical methods utilizing both optical microscopy and scanning electron microscopy to obtain erosion and corrosion information. The ultrasonic transducer analysis of the SN-285 primary pipe did not show any thinned locations in the pipe wall which were outside the expected range for the 3-in. schedule 40 pipe of 216 mils. A coupon was cut from the thinnest area on the pipe, and analysis of the inside surface, which was in contact with the tank waste, revealed a continuous layer of corrosion ~ 100 11m (4 mils) thick under a semi-continuous layer of tank waste residue ~ 20 11m (1 mil) thick. This residue layer was composed of an amorphous phase rich in chromium, magnesium, calcium, and chlorine. Small pits were detected throughout the inside pipe surface with depths up to ~ 50 11m (2 mils). Similarly, the SN-286 primary pipe did not show, by the ultrasonic transducer measurements, any thinned locations in the pipe wall which were outside the expected range for this pipe. Analysis of the coupon cut from the pipe section showed the presence of a tank waste layer containing sodium aluminate and phases rich in iron, calcium, and chromium. This layer was removed by a cleaning process that left a pipe surface continuous in iron oxide/hydroxide (corrosion) with pockets of aluminum oxide, possibly gibbsite. The corrosion layer was ~ 50 11m (2 mil) thick over non-continuous pits less than ~ 50 11m deep (2 mils). Small particles of aluminum oxide were also detected under the corrosion layer. The ultrasonic transducer analysis of SN-278, like the previous primary pipes, did not reveal any noticeable thinning of the pipe wall. Analysis of the coupon cut from the pipe showed that the inside surface had a layer of tank waste residue that was partially detached from the pipe wall. This layer was easily scraped from the surface and was composed of two separate layers. The underlying layer was ~ 350 11m (14 mils) thick and composed of a cementation of small aluminum oxide (probably gibbsite) particles. A thinner layer on top of the aluminum oxide layer was rich in carbon and chlorine. Scattered pitting was observed on the inside pipe surface with one pit as deep as 200 11m (8 mils).« less

  20. Experimental testing and modeling analysis of solute mixing at water distribution pipe junctions.

    PubMed

    Shao, Yu; Jeffrey Yang, Y; Jiang, Lijie; Yu, Tingchao; Shen, Cheng

    2014-06-01

    Flow dynamics at a pipe junction controls particle trajectories, solute mixing and concentrations in downstream pipes. The effect can lead to different outcomes of water quality modeling and, hence, drinking water management in a distribution network. Here we have investigated solute mixing behavior in pipe junctions of five hydraulic types, for which flow distribution factors and analytical equations for network modeling are proposed. First, based on experiments, the degree of mixing at a cross is found to be a function of flow momentum ratio that defines a junction flow distribution pattern and the degree of departure from complete mixing. Corresponding analytical solutions are also validated using computational-fluid-dynamics (CFD) simulations. Second, the analytical mixing model is further extended to double-Tee junctions. Correspondingly the flow distribution factor is modified to account for hydraulic departure from a cross configuration. For a double-Tee(A) junction, CFD simulations show that the solute mixing depends on flow momentum ratio and connection pipe length, whereas the mixing at double-Tee(B) is well represented by two independent single-Tee junctions with a potential water stagnation zone in between. Notably, double-Tee junctions differ significantly from a cross in solute mixing and transport. However, it is noted that these pipe connections are widely, but incorrectly, simplified as cross junctions of assumed complete solute mixing in network skeletonization and water quality modeling. For the studied pipe junction types, analytical solutions are proposed to characterize the incomplete mixing and hence may allow better water quality simulation in a distribution network. Published by Elsevier Ltd.

  1. 29 CFR 1915.163 - Ship's piping systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... are taken: (1) The isolation and shutoff valves connecting the dead system with the live system or... welded instead of bolted, at least two isolation and shutoff valves connecting the dead system with the...) Drain connections to the atmosphere on all of the dead interconnecting systems shall be opened for...

  2. 29 CFR 1915.163 - Ship's piping systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... are taken: (1) The isolation and shutoff valves connecting the dead system with the live system or... welded instead of bolted, at least two isolation and shutoff valves connecting the dead system with the...) Drain connections to the atmosphere on all of the dead interconnecting systems shall be opened for...

  3. 29 CFR 1915.163 - Ship's piping systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... are taken: (1) The isolation and shutoff valves connecting the dead system with the live system or... welded instead of bolted, at least two isolation and shutoff valves connecting the dead system with the...) Drain connections to the atmosphere on all of the dead interconnecting systems shall be opened for...

  4. 46 CFR 45.133 - Air pipes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Air pipes. 45.133 Section 45.133 Shipping COAST GUARD....133 Air pipes. (a) Where an air pipe to any tank extends above the freeboard or superstructure deck— (1) The exposed part of the air pipe must be made of steel and of sufficient thickness to avoid...

  5. 46 CFR 45.133 - Air pipes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Air pipes. 45.133 Section 45.133 Shipping COAST GUARD....133 Air pipes. (a) Where an air pipe to any tank extends above the freeboard or superstructure deck— (1) The exposed part of the air pipe must be made of steel and of sufficient thickness to avoid...

  6. 46 CFR 45.133 - Air pipes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Air pipes. 45.133 Section 45.133 Shipping COAST GUARD....133 Air pipes. (a) Where an air pipe to any tank extends above the freeboard or superstructure deck— (1) The exposed part of the air pipe must be made of steel and of sufficient thickness to avoid...

  7. 49 CFR 192.125 - Design of copper pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Design of copper pipe. 192.125 Section 192.125... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.125 Design of copper pipe. (a) Copper... hard drawn. (b) Copper pipe used in service lines must have wall thickness not less than that indicated...

  8. 46 CFR 45.133 - Air pipes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Air pipes. 45.133 Section 45.133 Shipping COAST GUARD....133 Air pipes. (a) Where an air pipe to any tank extends above the freeboard or superstructure deck— (1) The exposed part of the air pipe must be made of steel and of sufficient thickness to avoid...

  9. 46 CFR 45.133 - Air pipes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Air pipes. 45.133 Section 45.133 Shipping COAST GUARD....133 Air pipes. (a) Where an air pipe to any tank extends above the freeboard or superstructure deck— (1) The exposed part of the air pipe must be made of steel and of sufficient thickness to avoid...

  10. 46 CFR 154.514 - Piping: Electrical bonding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...

  11. 46 CFR 154.514 - Piping: Electrical bonding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...

  12. 46 CFR 154.514 - Piping: Electrical bonding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Piping: Electrical bonding. 154.514 Section 154.514... and Process Piping Systems § 154.514 Piping: Electrical bonding. (a) Cargo tanks or piping that are... side. (c) An electrical bond must be made by at least one of the following methods: (1) A metal bonding...

  13. 49 CFR 192.121 - Design of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design of plastic pipe. 192.121 Section 192.121... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.121 Design of plastic pipe. Subject to the limitations of § 192.123, the design pressure for plastic pipe is determined by either of the...

  14. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Diesel fuel piping systems. 75.1905-1 Section... Diesel fuel piping systems. (a) Diesel fuel piping systems from the surface must be designed and operated... spillage of fuel and that activates an alarm system. (b) All piping, valves and fittings must be— (1...

  15. 49 CFR 192.121 - Design of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Design of plastic pipe. 192.121 Section 192.121... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.121 Design of plastic pipe. Subject to the limitations of § 192.123, the design pressure for plastic pipe is determined by either of the...

  16. 49 CFR 192.121 - Design of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Design of plastic pipe. 192.121 Section 192.121... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.121 Design of plastic pipe. Subject to the limitations of § 192.123, the design pressure for plastic pipe is determined by either of the...

  17. 49 CFR 192.121 - Design of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Design of plastic pipe. 192.121 Section 192.121... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.121 Design of plastic pipe. Subject to the limitations of § 192.123, the design pressure for plastic pipe is determined by either of the...

  18. 49 CFR 195.212 - Bending of pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Bending of pipe. 195.212 Section 195.212... PIPELINE Construction § 195.212 Bending of pipe. (a) Pipe must not have a wrinkle bend. (b) Each field bend must comply with the following: (1) A bend must not impair the serviceability of the pipe. (2) Each...

  19. 49 CFR 195.212 - Bending of pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Bending of pipe. 195.212 Section 195.212... PIPELINE Construction § 195.212 Bending of pipe. (a) Pipe must not have a wrinkle bend. (b) Each field bend must comply with the following: (1) A bend must not impair the serviceability of the pipe. (2) Each...

  20. Asymptotic scalings of developing curved pipe flow

    NASA Astrophysics Data System (ADS)

    Ault, Jesse; Chen, Kevin; Stone, Howard

    2015-11-01

    Asymptotic velocity and pressure scalings are identified for the developing curved pipe flow problem in the limit of small pipe curvature and high Reynolds numbers. The continuity and Navier-Stokes equations in toroidal coordinates are linearized about Dean's analytical curved pipe flow solution (Dean 1927). Applying appropriate scaling arguments to the perturbation pressure and velocity components and taking the limits of small curvature and large Reynolds number yields a set of governing equations and boundary conditions for the perturbations, independent of any Reynolds number and pipe curvature dependence. Direct numerical simulations are used to confirm these scaling arguments. Fully developed straight pipe flow is simulated entering a curved pipe section for a range of Reynolds numbers and pipe-to-curvature radius ratios. The maximum values of the axial and secondary velocity perturbation components along with the maximum value of the pressure perturbation are plotted along the curved pipe section. The results collapse when the scaling arguments are applied. The numerically solved decay of the velocity perturbation is also used to determine the entrance/development lengths for the curved pipe flows, which are shown to scale linearly with the Reynolds number.

  1. Apparatus for inspecting piping

    DOEpatents

    Zollingger, W. Thor; Appel, D. Keith; Park, Larry R.

    1995-01-01

    An inspection rabbit for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON.RTM.). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system.

  2. Altitude Performance Characteristics of Tail-pipe Burner with Convergingconical Burner Section on J47 Turbojet Engine

    NASA Technical Reports Server (NTRS)

    Prince, William R; Mcaulay, John E

    1950-01-01

    An investigation of turbojet-engine thrust augmentation by means of tail-pipe burning was conducted in the NACA Lewis altitude wind tunnel. Performance data were obtained with a tail-pipe burner having a converging conical burner section installed on an axial-flow-compressor type turbojet engine over a range of simulated flight conditions and tail-pipe fuel-air ratios with a fixed-area exhaust nozzle. A maximum tail-pipe combustion efficiency of 0.86 was obtained at an altitude of 15,000 feet and a flight Mach number of 0.23. Tail-pipe burner operation was possible up to an altitude of 45,000 feet at a flight Mach number of 0.23.

  3. 46 CFR 61.15-10 - Liquefied-petroleum-gas piping for heating and cooking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Liquefied-petroleum-gas piping for heating and cooking. 61.15-10 Section 61.15-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE... piping for heating and cooking. (a) Leak tests as described in paragraph (b) of this section shall be...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greg Cuprak

    West Chester University is launching a comprehensive transformation of its campus heating and cooling systems from traditional fossil fuels (coal, oil and natural gas) to geothermal. This change will significantly decrease the institution's carbon footprint and serve as a national model for green campus efforts. The institution is in the process of designing and implementing this project to build well fields, a pumping station and install connecting piping to provide the geothermal heat/cooling source for campus buildings. This project addresses the US Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) goal to invest in clean energy technologiesmore » that strengthen the economy, protect the environment, and reduce dependence on foreign oil. In addition, this project advances EERE's efforts to establish geothermal energy as an economically competitive contributor to the US energy supply. For this grant, WCU will extend piping for its geo-exchange system. The work involves excavation of a trench approximately 8 feet wide and 10-12 feet deep located about 30 feet north of the curb along the north side of West Rosedale for a distance of approximately 1,300 feet. The trench will then turn north for the remaining distance (60 feet) to connect into the mechanical room in the basement of the Francis Harvey Green Library. This project will include crossing South Church Street near its intersection with West Rosedale, which will involve coordination with the Borough of West Chester. After installation of the piping, the trench will be backfilled and the surface restored to grass as it is now. Because the trench will run along a heavily-used portion of the campus, it will be accomplished in sections to minimize disruption to the campus as much as possible.« less

  5. Starting characteristics and combustion performance of magnesium slurry in 6.5-inch-diameter ram-jet engine mounted in connected-pipe facility

    NASA Technical Reports Server (NTRS)

    Gibbs, James B

    1954-01-01

    The starting characteristics and combustion performance of slurry type fuels, consisting of 50 percent magnesium powder in a hydrocarbon carrier, have been investigated in a flight-type, 6.5-inch-diameter ram-jet engine in a connected-pipe facility. Quick, dependable starting of the engine was obtained by the use of a disk which blocked part of the combustor area downstream of the flame holder. Acceptable performance was achieved with a short fuel-air mixing length by the development of a fuel-distribution control sleeve.

  6. 29 CFR 1926.913 - Blasting in excavation work under compressed air.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... connecting wires are connected up. (b) When detonators or explosives are brought into an air lock, no... of explosives and detonators. (e) All metal pipes, rails, air locks, and steel tunnel lining shall be...

  7. Dynamics of the inlet system of a four-stroke engine

    NASA Technical Reports Server (NTRS)

    Boden, R H; Schecter, Harry

    1944-01-01

    Tests were run on a single-cylinder and a multicylinder four-stroke engine in order to determine the effect of the dynamics of the inlet system upon indicated mean effective pressure. Tests on the single-cylinder engine were made at various speeds, inlet valve timings, and inlet pipe lengths. These tests indicated that the indicated mean effective pressure could be raised considerably at any one speed by the use of a suitably long inlet pipe. Tests at other speeds with this length of pipe showed higher indicated mean effective pressure than with a very short pipe, although not so high as could be obtained with the pipe length adjusted for each speed. A general relation was discovered between optimum time of inlet valve closing and pipe length; namely, that longer pipes require later inlet valve closing in order to be fully effective. Tests were also made on three cylinders connected to a single pipe. With this arrangement, increased volumetric efficiency at low speed was obtainable by using a long pipe, but only with a sacrifice of volumetric efficiency at high speed. Volumetric efficiency at high speed was progressively lower as the pipe length was increased.

  8. 40 CFR 427.10 - Applicability; description of the asbestos-cement pipe subcategory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... asbestos-cement pipe subcategory. 427.10 Section 427.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS ASBESTOS MANUFACTURING POINT SOURCE CATEGORY Asbestos-Cement Pipe Subcategory § 427.10 Applicability; description of the asbestos-cement pipe...

  9. 40 CFR 427.10 - Applicability; description of the asbestos-cement pipe subcategory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... asbestos-cement pipe subcategory. 427.10 Section 427.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS ASBESTOS MANUFACTURING POINT SOURCE CATEGORY Asbestos-Cement Pipe Subcategory § 427.10 Applicability; description of the asbestos-cement pipe...

  10. 46 CFR 42.15-50 - Air pipes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Air pipes. 42.15-50 Section 42.15-50 Shipping COAST... Conditions of Assignment of Freeboard § 42.15-50 Air pipes. (a) Where air pipes to ballast and other tanks.... Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. [CGFR 68...

  11. 46 CFR 42.15-50 - Air pipes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Air pipes. 42.15-50 Section 42.15-50 Shipping COAST... Conditions of Assignment of Freeboard § 42.15-50 Air pipes. (a) Where air pipes to ballast and other tanks.... Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. [CGFR 68...

  12. 46 CFR 42.15-50 - Air pipes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Air pipes. 42.15-50 Section 42.15-50 Shipping COAST... Conditions of Assignment of Freeboard § 42.15-50 Air pipes. (a) Where air pipes to ballast and other tanks.... Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. [CGFR 68...

  13. 46 CFR 42.15-50 - Air pipes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Air pipes. 42.15-50 Section 42.15-50 Shipping COAST... Conditions of Assignment of Freeboard § 42.15-50 Air pipes. (a) Where air pipes to ballast and other tanks.... Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. [CGFR 68...

  14. 46 CFR 42.15-50 - Air pipes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Air pipes. 42.15-50 Section 42.15-50 Shipping COAST... Conditions of Assignment of Freeboard § 42.15-50 Air pipes. (a) Where air pipes to ballast and other tanks.... Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes. [CGFR 68...

  15. 49 CFR 192.105 - Design formula for steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Design formula for steel pipe. 192.105 Section 192... for steel pipe. (a) The design pressure for steel pipe is determined in accordance with the following... § 192.113. T=Temperature derating factor determined in accordance with § 192.115. (b) If steel pipe that...

  16. 49 CFR 192.105 - Design formula for steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Design formula for steel pipe. 192.105 Section 192... for steel pipe. (a) The design pressure for steel pipe is determined in accordance with the following... § 192.113. T=Temperature derating factor determined in accordance with § 192.115. (b) If steel pipe that...

  17. 49 CFR 192.105 - Design formula for steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design formula for steel pipe. 192.105 Section 192... for steel pipe. (a) The design pressure for steel pipe is determined in accordance with the following... § 192.113. T=Temperature derating factor determined in accordance with § 192.115. (b) If steel pipe that...

  18. 49 CFR 192.105 - Design formula for steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design formula for steel pipe. 192.105 Section 192... for steel pipe. (a) The design pressure for steel pipe is determined in accordance with the following... § 192.113. T=Temperature derating factor determined in accordance with § 192.115. (b) If steel pipe that...

  19. 49 CFR 192.105 - Design formula for steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Design formula for steel pipe. 192.105 Section 192... for steel pipe. (a) The design pressure for steel pipe is determined in accordance with the following... § 192.113. T=Temperature derating factor determined in accordance with § 192.115. (b) If steel pipe that...

  20. 49 CFR 192.175 - Pipe-type and bottle-type holders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Pipe-type and bottle-type holders. 192.175 Section....175 Pipe-type and bottle-type holders. (a) Each pipe-type and bottle-type holder must be designed so... equipment, that might cause corrosion or interfere with the safe operation of the holder. (b) Each pipe-type...

  1. 49 CFR 192.175 - Pipe-type and bottle-type holders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipe-type and bottle-type holders. 192.175 Section....175 Pipe-type and bottle-type holders. (a) Each pipe-type and bottle-type holder must be designed so... equipment, that might cause corrosion or interfere with the safe operation of the holder. (b) Each pipe-type...

  2. Pressure suppression containment system for boiling water reactor

    DOEpatents

    Gluntz, Douglas M.; Nesbitt, Loyd B.

    1997-01-01

    A system for suppressing the pressure inside the containment of a BWR following a postulated accident. A piping subsystem is provided which features a main process pipe that communicates the wetwell airspace to a connection point downstream of the guard charcoal bed in an offgas system and upstream of the main bank of delay charcoal beds which give extensive holdup to offgases. The main process pipe is fitted with both inboard and outboard containment isolation valves. Also incorporated in the main process pipe is a low-differential-pressure rupture disk which prevents any gas outflow in this piping whatsoever until or unless rupture occurs by virtue of pressure inside this main process pipe on the wetwell airspace side of the disk exceeding the design opening (rupture) pressure differential. The charcoal holds up the radioactive species in the noncondensable gas from the wetwell plenum by adsorption, allowing time for radioactive decay before the gas is vented to the environs.

  3. Flexible ultrasonic pipe inspection apparatus

    DOEpatents

    Jenkins, C.F.; Howard, B.D.

    1998-06-23

    A flexible, modular ultrasonic pipe inspection apparatus, comprises a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present. 7 figs.

  4. Multi-terminal pipe routing by Steiner minimal tree and particle swarm optimisation

    NASA Astrophysics Data System (ADS)

    Liu, Qiang; Wang, Chengen

    2012-08-01

    Computer-aided design of pipe routing is of fundamental importance for complex equipments' developments. In this article, non-rectilinear branch pipe routing with multiple terminals that can be formulated as a Euclidean Steiner Minimal Tree with Obstacles (ESMTO) problem is studied in the context of an aeroengine-integrated design engineering. Unlike the traditional methods that connect pipe terminals sequentially, this article presents a new branch pipe routing algorithm based on the Steiner tree theory. The article begins with a new algorithm for solving the ESMTO problem by using particle swarm optimisation (PSO), and then extends the method to the surface cases by using geodesics to meet the requirements of routing non-rectilinear pipes on the surfaces of aeroengines. Subsequently, the adaptive region strategy and the basic visibility graph method are adopted to increase the computation efficiency. Numeral computations show that the proposed routing algorithm can find satisfactory routing layouts while running in polynomial time.

  5. Flexible ultrasonic pipe inspection apparatus

    DOEpatents

    Jenkins, Charles F.; Howard, Boyd D.

    1998-01-01

    A flexible, modular ultrasonic pipe inspection apparatus, comprising a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present.

  6. High speed variable delivery helical screw compressor/expander automotive air conditioning and waste heat energy recovery system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gagnon, J.A.; Schaefer, D.D.; Shaw, D.N.

    1980-09-02

    A compact, helical screw compressor/expander unit is described that is mounted in a vehicle and connected to the vehicle engine driven drive shaft has inlet and outlet ports and a capacity control slide valve and a pressure matching or volume ratio slide valve, respectively, for said ports. A refrigerant loop includes the compressor, a condenser mounted in the path of air flow over the engine and an evaporator mounted in a fresh air/cab return air flow duct for the occupant. Heat pipes thermally connect the cab air flow duct to the engine exhaust system which also bears the vapor boiler.more » Selectively operated damper valves control the fresh air/cab return air for passage selectively over the evaporator coil and the heat pipes as well as the exhaust gas flow over opposite ends of the heat pipes and the vapor boiler.« less

  7. Structural Dynamic Assessment of the GN2 Piping System for NASA's New and Powerful Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    McNelis, Mark E.; Staab, Lucas D.; Akers, James C.; Hughes, William O.; Chang, Li C.; Hozman, Aron D.; Henry, Michael W.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007 to 2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cubic feet in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their T-junctions connecting the 12 in. supply line to their respective 4 in. branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed T-junction connections through non-destructive evaluation testing. Through structural dynamic modeling of the piping system, the root cause of the T-junction connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.

  8. Structural Dynamic Assessment of the GN2 Piping System for NASA's New and Powerful Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    McNelis, Mark E.; Staab, Lucas D.; Akers, James C.; Hughes, WIlliam O.; Chang, Li, C.; Hozman, Aron D.; Henry, Michael W.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007-2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cu ft in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their "t-junctions" connecting the 12 inch supply line to their respective 4 inch branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed "t-junction" connections through non-destructive evaluation testing . Through structural dynamic modeling of the piping system, the root cause of the "t-junction" connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.

  9. Pulsatile turbulent flow through pipe bends at high Dean and Womersley numbers

    NASA Astrophysics Data System (ADS)

    Kalpakli, Athanasia; Örlü, Ramis; Tillmark, Nils; Alfredsson, P. Henrik

    2011-12-01

    Turbulent pulsatile flows through pipe bends are prevalent in internal combustion engine components which consist of bent pipe sections and branching conduits. Nonetheless, most of the studies related to pulsatile flows in pipe bends focus on incompressible, low Womersley and low Dean number flows, primarily because they aim in modeling blood flow, while internal combustion engine related flows have mainly been addressed in terms of integral quantities and consist of single point measurements. The present study aims at bridging the gap between these two fields by means of time-resolved stereoscopic particle image velocimetry measurements in a pipe bend with conditions that are close to those encountered in exhaust manifolds. The time/phase-resolved three-dimensional cross-sectional flow-field 3 pipe diameters downstream the pipe bend is captured and the interplay between different secondary motions throughout a pulse cycle is discussed.

  10. 40 CFR 427.10 - Applicability; description of the asbestos-cement pipe subcategory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... asbestos-cement pipe subcategory. 427.10 Section 427.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) ASBESTOS MANUFACTURING POINT SOURCE CATEGORY Asbestos-Cement Pipe Subcategory § 427.10 Applicability; description of the asbestos-cement pipe...

  11. 40 CFR 427.10 - Applicability; description of the asbestos-cement pipe subcategory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... asbestos-cement pipe subcategory. 427.10 Section 427.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) ASBESTOS MANUFACTURING POINT SOURCE CATEGORY Asbestos-Cement Pipe Subcategory § 427.10 Applicability; description of the asbestos-cement pipe...

  12. 40 CFR 427.10 - Applicability; description of the asbestos-cement pipe subcategory.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... asbestos-cement pipe subcategory. 427.10 Section 427.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) ASBESTOS MANUFACTURING POINT SOURCE CATEGORY Asbestos-Cement Pipe Subcategory § 427.10 Applicability; description of the asbestos-cement pipe...

  13. Heat pipe fatigue test specimen: Metallurgical evaluation

    NASA Technical Reports Server (NTRS)

    Walak, Steven E.; Cronin, Michael J.; Grobstein, Toni

    1992-01-01

    An innovative creep/fatigue test was run to simulate the temperature, mechanical load, and sodium corrosion conditions expected in a heat pipe designed to supply thermal energy to a Stirling cycle power converter. A sodium-charged Inconel 718 heat pipe with a Nickel 200 screen wick was operated for 1090 hr at temperatures between 950 K (1250 F) and 1050 K (1430 F) while being subjected to creep and fatigue loads in a servo-hydraulic testing machine. After testing, the heat pipe was sectioned and examined using optical microscopy, scanning electron microscopy, and electron microprobe analysis with wavelength dispersive x-ray spectroscopy. The analysis concentrated on evaluating topographic, microstructural, and chemical changes in the sodium exposed surfaces of the heat pipe wall and wick. Surface changes in the evaporator, condenser, and adiabatic sections of the heat pipe were examined in an effort to correlate the changes with the expected sodium environment in the heat pipe. This report describes the setup, operating conditions, and analytical results of the sodium heat pipe fatigue test.

  14. Study on Improving Partial Load by Connecting Geo-thermal Heat Pump System to Fuel Cell Network

    NASA Astrophysics Data System (ADS)

    Obara, Shinya; Kudo, Kazuhiko

    Hydrogen piping, the electric power line, and exhaust heat recovery piping of the distributed fuel cells are connected with network, and operational planning is carried out. Reduction of the efficiency in partial load is improved by operation of the geo-thermal heat pump linked to the fuel cell network. The energy demand pattern of the individual houses in Sapporo was introduced. And the analysis method aiming at minimization of the fuel rate by the genetic algorithm was described. The fuel cell network system of an analysis example assumed connecting the fuel cell co-generation of five houses. When geo-thermal heat pump was introduced into fuel cell network system stated in this paper, fuel consumption was reduced 6% rather than the conventional method

  15. Heat pipes for use in a magnetic field

    DOEpatents

    Werner, Richard W.; Hoffman, Myron A.

    1983-01-01

    A heat pipe configuration for use in a magnetic field environment of a fusion reactor. Heat pipes for operation in a magnetic field when liquid metal working fluids are used are optimized by flattening of the heat pipes having an unobstructed annulus which significantly reduces the adverse side region effect of the prior known cylindrically configured heat pipes. The flattened heat pipes operating in a magnetic field can remove 2--3 times the heat as a cylindrical heat pipe of the same cross sectional area.

  16. Axisymmetric wave propagation in buried, fluid-filled pipes: effects of wall discontinuities

    NASA Astrophysics Data System (ADS)

    Muggleton, J. M.; Brennan, M. J.

    2005-03-01

    Water leakage from buried pipes is a subject of great concern in Britain and across the world because of decreasing water supplies due to changing rainfall patterns, deterioration of antiquated distribution systems, and an increasing population. Correlation techniques are widely used to locate the leaks, however, difficulties are encountered when repairs have been made to a pipe by inserting a new length of pipe to replace a damaged section. Although this practice is now discouraged, the new sections might be of a different material or possibly different cross-section or wall thickness. The wave propagation behaviour at such joints is poorly understood at present. In earlier work, simple expressions for the wavenumbers of the s=1 (fluid-dominated) and s=2 (shell dominated) axisymmetric wave types were derived for a fluid-filled elastic pipe, both in vacuo and surrounded by an elastic medium of infinite extent. In this paper, the wave transmission and reflection characteristics of these waves at an axisymmetric pipe wall discontinuity in a fluid-filled piping system are investigated theoretically. For changes in wall thickness or wall elasticity, simple expressions may be used to characterise the joint. The reason for this is that negligible energy conversion between the wavetypes occurs, so the wavetypes can be considered separately. For changes in the fluid cross-section, significant mode conversion occurs and the wavetypes must be considered together.

  17. Finned Carbon-Carbon Heat Pipe with Potassium Working Fluid

    NASA Technical Reports Server (NTRS)

    Juhasz, Albert J.

    2010-01-01

    This elemental space radiator heat pipe is designed to operate in the 700 to 875 K temperature range. It consists of a C-C (carbon-carbon) shell made from poly-acrylonitride fibers that are woven in an angle interlock pattern and densified with pitch at high process temperature with integrally woven fins. The fins are 2.5 cm long and 1 mm thick, and provide an extended radiating surface at the colder condenser section of the heat pipe. The weave pattern features a continuous fiber bath from the inner tube surface to the outside edges of the fins to maximize the thermal conductance, and to thus minimize the temperature drop at the condenser end. The heat pipe and radiator element together are less than one-third the mass of conventional heat pipes of the same heat rejection surface area. To prevent the molten potassium working fluid from eroding the C C heat pipe wall, the shell is lined with a thin-walled, metallic tube liner (Nb-1 wt.% Zr), which is an integral part of a hermetic metal subassembly which is furnace-brazed to the inner surface of the C-C tube. The hermetic metal liner subassembly includes end caps and fill tubes fabricated from the same Nb-1Zr alloy. A combination of laser and electron beam methods is used to weld the end caps and fill tubes. A tungsten/inert gas weld seals the fill tubes after cleaning and charging the heat pipes with potassium. The external section of this liner, which was formed by a "Uniscan" rolling process, transitions to a larger wall thickness. This section, which protrudes beyond the C-C shell, constitutes the "evaporator" part of the heat pipe, while the section inside the shell constitutes the condenser of the heat pipe (see figure).

  18. 46 CFR 154.516 - Piping: Hull protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Piping: Hull protection. 154.516 Section 154.516 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... and Process Piping Systems § 154.516 Piping: Hull protection. A vessel's hull must be protected from...

  19. 78 FR 10134 - Welded Large Diameter Line Pipe From Japan: Final Results of the Expedited Second Sunset Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... Pipe From Japan: Final Results of the Expedited Second Sunset Review of the Antidumping Duty Order... antidumping duty order on welded large diameter line pipe (line pipe) from Japan pursuant to section 751(c) of... Department initiated the sunset review of the antidumping duty order on line pipe from Japan pursuant to...

  20. Composite drill pipe

    DOEpatents

    Leslie, James C [Fountain Valley, CA; Leslie, II, James C.; Heard, James [Huntington Beach, CA; Truong, Liem , Josephson; Marvin, Neubert [Huntington Beach, CA; Hans, [Anaheim, CA

    2008-12-02

    A composite pipe segment is formed to include tapered in wall thickness ends that are each defined by opposed frustoconical surfaces conformed for self centering receipt and intimate bonding contact within an annular space between corresponding surfaces of a coaxially nested set of metal end pieces. The distal peripheries of the nested end pieces are then welded to each other and the sandwiched and bonded portions are radially pinned. The composite segment may include imbedded conductive leads and the axial end portions of the end pieces are shaped to form a threaded joint with the next pipe assembly that includes a contact ring in one pipe assembly pierced by a pointed contact in the other to connect the corresponding leads across the joint.

  1. Apparatus for inspecting piping

    DOEpatents

    Zollingger, W.T.; Appel, D.K.; Park, L.R.

    1995-03-21

    An inspection rabbit is described for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON{trademark}). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system. 6 figures.

  2. Structural heat pipe. [for spacecraft wall thermal insulation system

    NASA Technical Reports Server (NTRS)

    Ollendorf, S. (Inventor)

    1974-01-01

    A combined structural reinforcing element and heat transfer member is disclosed for placement between a structural wall and an outer insulation blanket. The element comprises a heat pipe, one side of which supports the outer insulation blanket, the opposite side of which is connected to the structural wall. Heat penetrating through the outer insulation blanket directly reaches the heat pipe and is drawn off, thereby reducing thermal gradients in the structural wall. The element, due to its attachment to the structural wall, further functions as a reinforcing member.

  3. Pipe crawler with stabilizing midsection

    DOEpatents

    Zollinger, W.T.; Treanor, R.C.

    1994-12-27

    A pipe crawler is described having a midsection that provides the stability and flexibility to allow the pipe crawler to negotiate curved and uneven segments of piping while traveling through piping systems. The pipe crawler comprises a front leg assembly, a rear leg assembly, a midsection with a gimbal at each end for connecting the midsection to the front and rear leg assemblies in a flexible manner, and an air cylinder for changing the distance between the front and rear leg assemblies. The pipe crawler moves in ''inch worm'' fashion with the front and rear leg assemblies alternating between an extended and a retracted position as the air cylinder moves the retracted leg assembly forward. The midsection has a plurality of legs extending radially for holding the midsection within a maximum displacement from the piping axis so that the gimbals are not pivoted to extreme angles where they might lock up or seize. When the midsection is displaced sufficiently, its legs with wheels on each end engage the interior surface of the piping and prevent further displacement. Using two gimbals divides the angle between the planes defined by the front and rear leg assemblies which also helps to prevent excessive gimbal pivoting. 5 figures.

  4. Pipe crawler with stabilizing midsection

    DOEpatents

    Zollinger, William T.; Treanor, Richard C.

    1994-01-01

    A pipe crawler having a midsection that provides the stability and flexibty to allow the pipe crawler to negotiate curved and uneven segments of piping while traveling through piping systems. The pipe crawler comprises a front leg assembly, a rear leg assembly, a midsection with a gimbal at each end for connecting the midsection to the front and rear leg assemblies in a flexible manner, and an air cylinder for changing the distance between the front and rear leg assemblies. The pipe crawler moves in "inch worm" fashion with the front and rear leg assemblies alternating between an extended and a retracted position as the air cylinder moves the retracted leg assembly forward. The midsection has a plurality of legs extending radially for holding the midsection within a maximum displacement from the piping axis so that the gimbals are not pivoted to extreme angles where they might lock up or seize. When the midsection is displaced sufficiently, its legs with wheels on each end engage the interior surface of the piping and prevent further displacement. Using two gimbals divides the angle between the planes defined by the front and rear leg assemblies which also helps to prevent excessive gimbal pivoting.

  5. Pipe crawler with stabilizing midsection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.; Treanor, R.C.

    1993-09-20

    This invention is comprised of a pipe crawler having a midsection that provides the stability and flexibility to allow the pipe crawler to negotiate curved and uneven segments of piping while traveling through piping systems. The pipe crawler comprises a front leg assembly, a rear leg assembly, a midsection with a gimbal at each end for connecting the midsection to the front and rear leg assemblies in a flexible manner, and an air cylinder for changing the distance between the front and rear leg assemblies. The pipe crawler moves in ``inch worm`` fashion with the front and rear leg assembliesmore » alternating between an extended and a retracted position as the air cylinder moves the retracted leg assembly forward. The midsection has a plurality of legs extending radially for holding the midsection within a maximum displacement from the piping axis so that the gimbals are not pivoted to extreme angles where they might lock up or seize. When the midsection is displaced sufficiently, its legs with wheels on each end engage the interior surface of the piping and prevent further displacement. Using two gimbals divides the angle between the planes defined by the front and rear leg assemblies which also helps to prevent excessive gimbal pivoting.« less

  6. Pipe crawler with stabilizing midsection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.; Treanor, R.C.

    1994-12-27

    A pipe crawler is described having a midsection that provides the stability and flexibility to allow the pipe crawler to negotiate curved and uneven segments of piping while traveling through piping systems. The pipe crawler comprises a front leg assembly, a rear leg assembly, a midsection with a gimbal at each end for connecting the midsection to the front and rear leg assemblies in a flexible manner, and an air cylinder for changing the distance between the front and rear leg assemblies. The pipe crawler moves in ''inch worm'' fashion with the front and rear leg assemblies alternating between anmore » extended and a retracted position as the air cylinder moves the retracted leg assembly forward. The midsection has a plurality of legs extending radially for holding the midsection within a maximum displacement from the piping axis so that the gimbals are not pivoted to extreme angles where they might lock up or seize. When the midsection is displaced sufficiently, its legs with wheels on each end engage the interior surface of the piping and prevent further displacement. Using two gimbals divides the angle between the planes defined by the front and rear leg assemblies which also helps to prevent excessive gimbal pivoting. 5 figures.« less

  7. 46 CFR 76.17-15 - Piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Piping. 76.17-15 Section 76.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...

  8. 46 CFR 76.17-15 - Piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Piping. 76.17-15 Section 76.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...

  9. 46 CFR 95.17-15 - Piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Piping. 95.17-15 Section 95.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...

  10. 46 CFR 95.17-15 - Piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Piping. 95.17-15 Section 95.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 95.17-15 Piping. (a) All piping, valves, and fittings shall meet the applicable...

  11. 46 CFR 177.970 - Protection against hot piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Protection against hot piping. 177.970 Section 177.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.970 Protection against hot piping. Piping...

  12. 46 CFR 177.970 - Protection against hot piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Protection against hot piping. 177.970 Section 177.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.970 Protection against hot piping. Piping...

  13. 46 CFR 177.970 - Protection against hot piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Protection against hot piping. 177.970 Section 177.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.970 Protection against hot piping. Piping...

  14. 46 CFR 177.970 - Protection against hot piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Protection against hot piping. 177.970 Section 177.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.970 Protection against hot piping. Piping...

  15. 46 CFR 177.970 - Protection against hot piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Protection against hot piping. 177.970 Section 177.970 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) CONSTRUCTION AND ARRANGEMENT Rails and Guards § 177.970 Protection against hot piping. Piping...

  16. 46 CFR 154.660 - Pipe welding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Pipe welding. 154.660 Section 154.660 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.660 Pipe welding. (a) Pipe welding must meet Part 57 of this chapter. (b) Longitudinal butt welds...

  17. 49 CFR 192.125 - Design of copper pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Design of copper pipe. 192.125 Section 192.125 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Pipe Design § 192.125 Design of copper pipe. (a) Copper...

  18. 46 CFR 119.510 - Bilge piping system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Bilge piping system. 119.510 Section 119.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... Ballast Systems § 119.510 Bilge piping system. A vessel must be provided with a piping system that meets...

  19. 46 CFR 119.510 - Bilge piping system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Bilge piping system. 119.510 Section 119.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... Ballast Systems § 119.510 Bilge piping system. A vessel must be provided with a piping system that meets...

  20. 46 CFR 154.660 - Pipe welding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Pipe welding. 154.660 Section 154.660 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.660 Pipe welding. (a) Pipe welding must meet part 57 of this chapter. (b) Longitudinal butt welds...

  1. 46 CFR 154.660 - Pipe welding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Pipe welding. 154.660 Section 154.660 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.660 Pipe welding. (a) Pipe welding must meet Part 57 of this chapter. (b) Longitudinal butt welds...

  2. 46 CFR 154.660 - Pipe welding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Pipe welding. 154.660 Section 154.660 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.660 Pipe welding. (a) Pipe welding must meet part 57 of this chapter. (b) Longitudinal butt welds...

  3. 46 CFR 154.660 - Pipe welding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Pipe welding. 154.660 Section 154.660 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.660 Pipe welding. (a) Pipe welding must meet part 57 of this chapter. (b) Longitudinal butt welds...

  4. 46 CFR 154.910 - Inert gas piping: Location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inert gas piping: Location. 154.910 Section 154.910 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY... Atmospheric Control in Cargo Containment Systems § 154.910 Inert gas piping: Location. Inert gas piping must...

  5. 49 CFR 192.107 - Yield strength (S) for steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Yield strength (S) for steel pipe. 192.107 Section 192.107 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... (S) for steel pipe. (a) For pipe that is manufactured in accordance with a specification listed in...

  6. 49 CFR 192.107 - Yield strength (S) for steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Yield strength (S) for steel pipe. 192.107 Section 192.107 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... (S) for steel pipe. (a) For pipe that is manufactured in accordance with a specification listed in...

  7. 49 CFR 192.107 - Yield strength (S) for steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Yield strength (S) for steel pipe. 192.107 Section 192.107 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... (S) for steel pipe. (a) For pipe that is manufactured in accordance with a specification listed in...

  8. 49 CFR 192.107 - Yield strength (S) for steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Yield strength (S) for steel pipe. 192.107 Section 192.107 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... (S) for steel pipe. (a) For pipe that is manufactured in accordance with a specification listed in...

  9. 49 CFR 192.107 - Yield strength (S) for steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Yield strength (S) for steel pipe. 192.107 Section 192.107 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... (S) for steel pipe. (a) For pipe that is manufactured in accordance with a specification listed in...

  10. Seismic performance of steel pipe pile to cap beam moment resisting connections.

    DOT National Transportation Integrated Search

    2013-01-01

    This research, a joint effort between AUTC and North Carolina State University, is a continuation of an ngoing project that investigated bridge and marine structure : design practices, aiming to identify improved connection design approaches to produ...

  11. Inter-rater reliability of the PIPES tool: validation of a surgical capacity index for use in resource-limited settings.

    PubMed

    Markin, Abraham; Barbero, Roxana; Leow, Jeffrey J; Groen, Reinou S; Perlman, Greg; Habermann, Elizabeth B; Apelgren, Keith N; Kushner, Adam L; Nwomeh, Benedict C

    2014-09-01

    In response to the need for simple, rapid means of quantifying surgical capacity in low resource settings, Surgeons OverSeas (SOS) developed the personnel, infrastructure, procedures, equipment and supplies (PIPES) tool. The present investigation assessed the inter-rater reliability of the PIPES tool. As part of a government assessment of surgical services in Santa Cruz, Bolivia, the PIPES tool was translated into Spanish and applied in interviews with physicians at 31 public hospitals. An additional interview was conducted with nurses at a convenience sample of 25 of these hospitals. Physician and nurse responses were then compared to generate an estimate of reliability. For dichotomous survey items, inter-rater reliability between physicians and nurses was assessed using the Cohen's kappa statistic and percent agreement. The Pearson correlation coefficient was used to assess agreement for continuous items. Cohen's kappa was 0.46 for infrastructure, 0.43 for procedures, 0.26 for equipment, and 0 for supplies sections. The median correlation coefficient was 0.91 for continuous items. Correlation was 0.79 for the PIPES index, and ranged from 0.32 to 0.98 for continuous response items. Reliability of the PIPES tool was moderate for the infrastructure and procedures sections, fair for the equipment section, and poor for supplies section when comparing surgeons' responses to nurses' responses-an extremely rigorous test of reliability. These results indicate that the PIPES tool is an effective measure of surgical capacity but that the equipment and supplies sections may need to be revised.

  12. 10. VIEW UPSTREAM OF PIPELINE SECTION AT JUNCTION OF HUME ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. VIEW UPSTREAM OF PIPELINE SECTION AT JUNCTION OF HUME CEMENT PIPE AND CAST-IRON (460'). NOTE CYLINDRICAL COLLAR OF CEMENT SECTIONS AND BELL JUNCTIONS OF IRON PIPE. - Kalaupapa Water Supply System, Waikolu Valley to Kalaupapa Settlement, Island of Molokai, Kalaupapa, Kalawao County, HI

  13. Apparatus for growing crystals

    NASA Technical Reports Server (NTRS)

    Jasinski, Thomas J. (Inventor); Witt, August F. (Inventor)

    1986-01-01

    An improved apparatus and method for growing crystals from a melt employing a heat pipe, consisting of one or more sections, each section serving to control temperature and thermal gradients in the crystal as it forms inside the pipe.

  14. Heat pipe life and processing study

    NASA Technical Reports Server (NTRS)

    Antoniuk, D.; Luedke, E. E.

    1979-01-01

    The merit of adding water to the reflux charge in chemically and solvent cleaned aluminum/slab wick/ammonia heat pipes was evaluated. The effect of gas in the performance of three heat pipe thermal control systems was found significant in simple heat pipes, less significant in a modified simple heat pipe model with a short wickless pipe section. Use of gas data for the worst and best heat pipes of the matrix in a variable conductance heat pipe model showed a 3 C increase in the source temperature at full on condition after 20 and 246 years, respectively.

  15. Miniature pipe crawler tractor

    DOEpatents

    McKay, Mark D.; Anderson, Matthew O.; Ferrante, Todd A.; Willis, W. David

    2000-01-01

    A pipe crawler tractor may comprise a half tractor assembly having a first base drive wheel, a second base drive wheel, and a top drive wheel. The drive wheels are mounted in spaced-apart relation so that the top drive wheel is positioned between the first and second base drive wheels. The mounting arrangement is also such that the first and second base drive wheels contact the inside surface of the pipe at respective first and second positions and so that the top drive wheel contacts the inside surface of the pipe at a third position, the third position being substantially diametrically opposed to the first and second positions. A control system connected to the half tractor assembly controls the rotation of the first base wheel, the second base wheel, and the top drive wheel to move the half tractor assembly within the pipe.

  16. RF transmission line and drill/pipe string switching technology for down-hole telemetry

    DOEpatents

    Clark, David D [Santa Fe, NM; Coates, Don M [Santa Fe, NM

    2007-08-14

    A modulated reflectance well telemetry apparatus having an electrically conductive pipe extending from above a surface to a point below the surface inside a casing. An electrical conductor is located at a position a distance from the electrically conductive pipe and extending from above the surface to a point below the surface. Modulated reflectance apparatus is located below the surface for modulating well data into a RF carrier transmitted from the surface and reflecting the modulated carrier back to the surface. A RF transceiver is located at the surface and is connected between the electrically conductive pipe and the electrical conductor for transmitting a RF signal that is confined between the electrically conductive well pipe and the electrical conductor to the modulated reflectance apparatus, and for receiving reflected data on the well from the modulated reflectance apparatus.

  17. Heat pipes for use in a magnetic field

    DOEpatents

    Werner, R.W.; Hoffman, M.A.

    1983-07-19

    A heat pipe configuration for use in a magnetic field environment of a fusion reactor is disclosed. Heat pipes for operation in a magnetic field when liquid metal working fluids are used are optimized by flattening of the heat pipes having an unobstructed annulus which significantly reduces the adverse side region effect of the prior known cylindrically configured heat pipes. The flattened heat pipes operating in a magnetic field can remove 2--3 times the heat as a cylindrical heat pipe of the same cross sectional area. 4 figs.

  18. The algorithm of verification of welding process for plastic pipes

    NASA Astrophysics Data System (ADS)

    Rzasinski, R.

    2017-08-01

    The study analyzes the process of butt welding of PE pipes in terms of proper selection of connector parameters. The process was oriented to the elements performed as a series of types of pipes. Polymeric materials commonly referred to as polymers or plastics, synthetic materials are produced from oil products in the polyreaction compounds of low molecular weight, called monomers. During the polyreactions monomers combine to build a macromolecule material monomer named with the prefix poly polypropylene, polyethylene or polyurethane, creating particles in solid state on the order of 0,2 to 0,4 mm. Finished products from polymers of virtually any shape and size are obtained by compression molding, injection molding, extrusion, laminating, centrifugal casting, etc. Weld can only be a thermoplastic that softens at an elevated temperature, and thus can be connected via a clamp. Depending on the source and method of supplying heat include the following welding processes: welding contact, radiant welding, friction welding, dielectric welding, ultrasonic welding. The analysis will be welding contact. In connection with the development of new generation of polyethylene, and the production of pipes with increasing dimensions (diameter, wall thickness) is important to select the correct process.

  19. Superconducting Cable Termination

    DOEpatents

    Sinha, Uday K.; Tolbert, Jerry

    2005-08-30

    Disclosed is a termination that connects high temperature superconducting (HTS) cable immersed in pressurized liquid nitrogen to high voltage and neutral (shield) external bushings at ambient temperature and pressure. The termination consists of a splice between the HTS power (inner) and shield (outer) conductors and concentric copper pipes which are the conductors in the termination. There is also a transition from the dielectric tape insulator used in the HTS cable to the insulators used between and around the copper pipe conductors in the termination. At the warm end of the termination the copper pipes are connected via copper braided straps to the conventional warm external bushings which have low thermal stresses. This termination allows for a natural temperature gradient in the copper pipe conductors inside the termination which enables the controlled flashing of the pressurized liquid coolant (nitrogen) to the gaseous state. Thus the entire termination is near the coolant supply pressure and the high voltage and shield cold bushings, a highly stressed component used in most HTS cables, are eliminated. A sliding seal allows for cable contraction as it is cooled from room temperature to ˜72-82 K. Seals, static vacuum, and multi-layer superinsulation minimize radial heat leak to the environment.

  20. Assessing Impervious Surface Connectivity and Applications for Watershed Management

    EPA Science Inventory

    Although total impervious area (TIA) is often used as an indicator of urban disturbance, recent studies suggest that the subset of impervious surfaces that route stormwater runoff directly to streams via stormwater pipes, called directly connected impervious area (DCIA), may be a...

  1. 24 CFR 3280.706 - Oil piping systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... installation extension, alteration, or repair, of any oil piping systems shall be new and free from defects or... used to join sections of threaded pipe. Right and left nipples or couplings shall not be used. (h...

  2. 46 CFR 153.281 - Piping to independent tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Piping to independent tanks. 153.281 Section 153.281... Systems and Cargo Handling Equipment § 153.281 Piping to independent tanks. Piping for an independent cargo tank must penetrate the tank only through that part of the tank or dome extending above the...

  3. 46 CFR 153.281 - Piping to independent tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Piping to independent tanks. 153.281 Section 153.281... Systems and Cargo Handling Equipment § 153.281 Piping to independent tanks. Piping for an independent cargo tank must penetrate the tank only through that part of the tank or dome extending above the...

  4. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Diesel fuel piping systems. 75.1905-1 Section... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1905-1 Diesel fuel piping systems. (a) Diesel fuel piping systems from the surface must be designed and operated...

  5. 46 CFR 154.517 - Piping: Liquid pressure relief.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...

  6. 46 CFR 154.517 - Piping: Liquid pressure relief.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...

  7. 46 CFR 154.517 - Piping: Liquid pressure relief.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...

  8. 46 CFR 154.517 - Piping: Liquid pressure relief.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...

  9. 46 CFR 154.517 - Piping: Liquid pressure relief.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Piping: Liquid pressure relief. 154.517 Section 154.517... and Process Piping Systems § 154.517 Piping: Liquid pressure relief. The cargo loading and discharge crossover headers, cargo hoses, and cargo loading arms must have means to relieve cargo pressure and to...

  10. 46 CFR 45.153 - Through-hull piping: General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Through-hull piping: General. 45.153 Section 45.153... Conditions of Assignment § 45.153 Through-hull piping: General. (a) All through-hull pipes required by this subpart must be made of steel or material equivalent to the hull in strength and fatigue resistance. (b...

  11. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  12. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  13. 49 CFR 192.123 - Design limitations for plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Design limitations for plastic pipe. 192.123... Design limitations for plastic pipe. (a) Except as provided in paragraph (e) and paragraph (f) of this section, the design pressure may not exceed a gauge pressure of 100 psig (689 kPa) for plastic pipe used...

  14. 49 CFR 192.123 - Design limitations for plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Design limitations for plastic pipe. 192.123... Design limitations for plastic pipe. (a) Except as provided in paragraph (e) and paragraph (f) of this section, the design pressure may not exceed a gauge pressure of 100 psig (689 kPa) for plastic pipe used...

  15. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  16. 49 CFR 192.123 - Design limitations for plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design limitations for plastic pipe. 192.123... Design limitations for plastic pipe. (a) Except as provided in paragraph (e) and paragraph (f) of this section, the design pressure may not exceed a gauge pressure of 100 psig (689 kPa) for plastic pipe used...

  17. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  18. 49 CFR 192.311 - Repair of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Repair of plastic pipe. 192.311 Section 192.311... Lines and Mains § 192.311 Repair of plastic pipe. Each imperfection or damage that would impair the serviceability of plastic pipe must be repaired or removed. [Amdt. 192-93, 68 FR 53900, Sept. 15, 2003] ...

  19. 49 CFR 192.109 - Nominal wall thickness (t) for steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Nominal wall thickness (t) for steel pipe. 192.109 Section 192.109 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Nominal wall thickness (t) for steel pipe. (a) If the nominal wall thickness for steel pipe is not known...

  20. 49 CFR 192.109 - Nominal wall thickness (t) for steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Nominal wall thickness (t) for steel pipe. 192.109 Section 192.109 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Nominal wall thickness (t) for steel pipe. (a) If the nominal wall thickness for steel pipe is not known...

  1. 49 CFR 192.109 - Nominal wall thickness (t) for steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Nominal wall thickness (t) for steel pipe. 192.109 Section 192.109 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Nominal wall thickness (t) for steel pipe. (a) If the nominal wall thickness for steel pipe is not known...

  2. 49 CFR 192.109 - Nominal wall thickness (t) for steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Nominal wall thickness (t) for steel pipe. 192.109 Section 192.109 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Nominal wall thickness (t) for steel pipe. (a) If the nominal wall thickness for steel pipe is not known...

  3. 49 CFR 192.109 - Nominal wall thickness (t) for steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Nominal wall thickness (t) for steel pipe. 192.109 Section 192.109 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Nominal wall thickness (t) for steel pipe. (a) If the nominal wall thickness for steel pipe is not known...

  4. 46 CFR 56.90-10 - Threaded piping (modifies 135.5).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Threaded piping (modifies 135.5). 56.90-10 Section 56.90-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Assembly § 56.90-10 Threaded piping (modifies 135.5). (a) Any compound or...

  5. Hydronic rooftop cooling systems

    DOEpatents

    Bourne, Richard C [Davis, CA; Lee, Brian Eric [Monterey, CA; Berman, Mark J [Davis, CA

    2008-01-29

    A roof top cooling unit has an evaporative cooling section that includes at least one evaporative module that pre-cools ventilation air and water; a condenser; a water reservoir and pump that captures and re-circulates water within the evaporative modules; a fan that exhausts air from the building and the evaporative modules and systems that refill and drain the water reservoir. The cooling unit also has a refrigerant section that includes a compressor, an expansion device, evaporator and condenser heat exchangers, and connecting refrigerant piping. Supply air components include a blower, an air filter, a cooling and/or heating coil to condition air for supply to the building, and optional dampers that, in designs that supply less than 100% outdoor air to the building, control the mixture of return and ventilation air.

  6. 4 Metre diameter penstock construction for the Raymond Reservoir Hydro Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, H.D.; Alexander, M.

    1995-12-31

    A four metre diameter 770 m long buried steel penstock was constructed for the 20 MW Raymond Reservoir Hydro Project in southern Alberta. The penstock delivers up to 56.7 m{sup 3}/sec of irrigation water at an effective head of 44 m to a 2.6 m diameter Kaplan turbine. The hydro facility was commissioned in the spring of 1994. The steel pipe was delivered to the site in 18 m long sections from a fabrication plant located 250 km away. Specialized equipment was engineered and constructed to externally coat and internally line the pipe sections on site. The pipe sections, weighingmore » from 27,000 to 30,000 kg, were rolled and moved on a specially built lathe during the external sandblasting and tape wrapping operation. The external tape wrapping is one element of the cathodic protection system for the steel pipe. Specialized equipment was modified to sandblast the interior to white metal and then mechanically apply three coats of internal epoxy lining. The internal lining improves the hydraulic characteristics of the pipe in addition to protecting the pipe from corrosion. This innovative approach to coating and lining the pipe resulted in an exceptionally high quality product at an affordable cost.« less

  7. Seating arrangement and structure of a spool within a well casing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lien, N.C.; Olsen, D.G.

    1990-07-10

    This patent describes a well construction having a vertical well casing and a spool. It comprises: the spool being insertable into the well casing and the spool having a flange with a skirt that bottoms against a collar in the well casing to form a seated contact engagement between the skirt and the collar, a support web connected to the flange and extending substantially perpendicular to the skirt. The support web has an undersurface which extends upwardly and radially inwardly from the flange,a sleeve section connected to the web radially inwardly thereof from which a pipe section is suspended therefrom,more » and a ring portion at a junction of the support web and the sleeve about which transmitted forces are resolved, the skirt and the collar being angled at an angle {theta} relative to the vertical such that {theta} has a value less than tan {theta} equal to 1/{mu} and greater than tan {theta} equal to {mu} where {mu} equals the coefficient of static friction between the skirt and the collar.« less

  8. 50. PIPING FOR SUBMARINE SECTION, Y&D No. 107728 Scale 3/8' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. PIPING FOR SUBMARINE SECTION, Y&D No. 107728 Scale 3/8' = 1'; August 26, 1929 - U.S. Naval Submarine Base, New London Submarine Escape Training Tank, Albacore & Darter Roads, Groton, New London County, CT

  9. Flutter instability of freely hanging articulated pipes conveying fluid

    NASA Astrophysics Data System (ADS)

    Schouveiler, Lionel; Chermette, Félix

    2018-03-01

    We experimentally investigate the stability of freely hanging articulated pipes made of rigid segments connected by flexible joints and with their displacements constrained in a vertical plane. When the velocity of the fluid conveyed by the pipe is increased, flutter-type instability occurs above a critical value. The critical velocity and the characteristics of the flutter modes (frequency, amplitude, and shape) are determined as a function of the number n of segments into the pipe which is varied from 2 to 5. Experimental results are compared to predictions from linear stability analysis extending previous studies by taking into account damping due to the dissipation in the joints. Qualitative agreement is found and the limits of the analysis are discussed.

  10. Passive environmental temperature control system

    DOEpatents

    Corliss, John M.; Stickford, George H.

    1981-01-01

    Passive environmental heating and cooling systems are described, which utilize heat pipes to transmit heat to or from a thermal reservoir. In a solar heating system, a heat pipe is utilized to carry heat from a solar heat absorber plate that receives sunlight, through a thermal insulation barrier, to a heat storage wall, with the outer end of the pipe which is in contact with the solar absorber being lower than the inner end. The inclining of the heat pipe assures that the portion of working fluid, such as Freon, which is in a liquid phase will fall by gravity to the outer end of the pipe, thereby assuring diode action that prevents the reverse transfer of heat from the reservoir to the outside on cool nights. In a cooling system, the outer end of the pipe which connects to a heat dissipator, is higher than the inner end that is coupled to a cold reservoir, to allow heat transfer only out of the reservoir to the heat dissipator, and not in the reverse direction.

  11. Pressure suppression containment system for boiling water reactor

    DOEpatents

    Gluntz, D.M.; Nesbitt, L.B.

    1997-01-21

    A system is disclosed for suppressing the pressure inside the containment of a BWR following a postulated accident. A piping subsystem is provided which features a main process pipe that communicates the wetwell airspace to a connection point downstream of the guard charcoal bed in an offgas system and upstream of the main bank of delay charcoal beds which give extensive holdup to offgases. The main process pipe is fitted with both inboard and outboard containment isolation valves. Also incorporated in the main process pipe is a low-differential-pressure rupture disk which prevents any gas outflow in this piping whatsoever until or unless rupture occurs by virtue of pressure inside this main process pipe on the wetwell airspace side of the disk exceeding the design opening (rupture) pressure differential. The charcoal holds up the radioactive species in the noncondensable gas from the wetwell plenum by adsorption, allowing time for radioactive decay before the gas is vented to the environs. 3 figs.

  12. HATCH CONNECTING TEMPERED AIR CHAMBER AND HOT AIR CHAMBER OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HATCH CONNECTING TEMPERED AIR CHAMBER AND HOT AIR CHAMBER OF PLENUM WITH ATTACHED DRAFT REGULATOR. - Hot Springs National Park, Bathhouse Row, Superior Bathhouse: Mechanical & Piping Systems, State Highway 7, 1 mile north of U.S. Highway 70, Hot Springs, Garland County, AR

  13. OPTIMIZING STORMWATER MANAGEMENT RETROFITS BASED ON IMPERVIOUS SURFACE CONNECTIONS TO SEWERS

    EPA Science Inventory

    Although total impervious area (TIA) is often used as an indicator of urban disturbance, recent studies suggest that the subset of impervious surfaces that route stormwater runoff directly to streams via stormwater pipes, called directly connected impervious area (DCIA), may be a...

  14. Experimental and analytical study of water pipe's rupture for damage identification purposes

    NASA Astrophysics Data System (ADS)

    Papakonstantinou, Konstantinos G.; Shinozuka, Masanobu; Beikae, Mohsen

    2011-04-01

    A malfunction, local damage or sudden pipe break of a pipeline system can trigger significant flow variations. As shown in the paper, pressure variations and pipe vibrations are two strongly correlated parameters. A sudden change in the flow velocity and pressure of a pipeline system can induce pipe vibrations. Thus, based on acceleration data, a rapid detection and localization of a possible damage may be carried out by inexpensive, nonintrusive monitoring techniques. To illustrate this approach, an experiment on a single pipe was conducted in the laboratory. Pressure gauges and accelerometers were installed and their correlation was checked during an artificially created transient flow. The experimental findings validated the correlation between the parameters. The interaction between pressure variations and pipe vibrations was also theoretically justified. The developed analytical model explains the connection among flow pressure, velocity, pressure wave propagation and pipe vibration. The proposed method provides a rapid, efficient and practical way to identify and locate sudden failures of a pipeline system and sets firm foundations for the development and implementation of an advanced, new generation Supervisory Control and Data Acquisition (SCADA) system for continuous health monitoring of pipe networks.

  15. Comparison and validation of acoustic response models for wind noise reduction pipe arrays

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marty, Julien; Denis, Stéphane; Gabrielson, Thomas

    The detection capability of the infrasound component of the International Monitoring System (IMS) is tightly linked to the performance of its wind noise reduction systems. The wind noise reduction solution implemented at all IMS infrasound measurement systems consists of a spatial distribution of air inlets connected to the infrasound sensor through a network of pipes. This system, usually referred to as “pipe array,” has proven its efficiency in operational conditions. The objective of this paper is to present the results of the comparison and validation of three distinct acoustic response models for pipe arrays. The characteristics of the models andmore » the results obtained for a defined set of pipe array configurations are described. A field experiment using a newly developed infrasound generator, dedicated to the validation of these models, is then presented. The comparison between the modeled and empirical acoustic responses shows that two of the three models can be confidently used to estimate pipe array acoustic responses. Lastly, this study paves the way to the deconvolution of IMS infrasound data from pipe array responses and to the optimization of pipe array design to IMS applications.« less

  16. Comparison and validation of acoustic response models for wind noise reduction pipe arrays

    DOE PAGES

    Marty, Julien; Denis, Stéphane; Gabrielson, Thomas; ...

    2017-02-13

    The detection capability of the infrasound component of the International Monitoring System (IMS) is tightly linked to the performance of its wind noise reduction systems. The wind noise reduction solution implemented at all IMS infrasound measurement systems consists of a spatial distribution of air inlets connected to the infrasound sensor through a network of pipes. This system, usually referred to as “pipe array,” has proven its efficiency in operational conditions. The objective of this paper is to present the results of the comparison and validation of three distinct acoustic response models for pipe arrays. The characteristics of the models andmore » the results obtained for a defined set of pipe array configurations are described. A field experiment using a newly developed infrasound generator, dedicated to the validation of these models, is then presented. The comparison between the modeled and empirical acoustic responses shows that two of the three models can be confidently used to estimate pipe array acoustic responses. Lastly, this study paves the way to the deconvolution of IMS infrasound data from pipe array responses and to the optimization of pipe array design to IMS applications.« less

  17. Development of an integrated heat pipe-thermal storage system for a solar receiver

    NASA Technical Reports Server (NTRS)

    Keddy, E.; Sena, J. Tom; Merrigan, M.; Heidenreich, Gary; Johnson, Steve

    1988-01-01

    An integrated heat pipe-thermal storage system was developed as part of the Organic Rankine Cycle Solar Dynamic Power System solar receiver for space station application. The solar receiver incorporates potassium heat pipe elements to absorb and transfer the solar energy within the receiver cavity. The heat pipes contain thermal energy storage (TES) canisters within the vapor space with a toluene heater tube used as the condenser region of the heat pipe. During the insolation period of the earth orbit, solar energy is delivered to the heat pipe. Part of this thermal energy is delivered to the heater tube and the balance is stored in the TES units. During the eclipse period of earth orbit, the stored energy in the TES units is transferred by the potassium vapor to the toluene heater tube. A developmental heat pipe element was constructed that contains axial arteries and a distribution wick connecting the toluene heater and the TES units to the solar insolation surface of the heat pipe. Tests were conducted to demonstrate the heat pipe, TES units, and the heater tube operation. The heat pipe element was operated at design input power of 4.8 kW. Thermal cycle tests were conducted to demonstrate the successful charge and discharge of the TES units. Axial power flux levels up to 15 watts/sq cm were demonstrated and transient tests were conducted on the heat pipe element. Details of the heat pipe development and test procedures are presented.

  18. 76 FR 66893 - Certain Circular Welded Carbon Steel Pipes and Tubes From India, Thailand, and Turkey; Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ...] Certain Circular Welded Carbon Steel Pipes and Tubes From India, Thailand, and Turkey; Final Results of... circular welded carbon steel pipes and tubes from India, Thailand, and Turkey, pursuant to section 751(c..., Thailand, and Turkey. See Antidumping Duty Order; Certain Welded Carbon Steel Standard Pipes and Tubes from...

  19. 75 FR 75964 - Non-Malleable Cast Iron Pipe Fittings From the People's Republic of China: Extension of Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-570-875] Non-Malleable Cast Iron Pipe...-malleable cast iron pipe fittings from the People's Republic of China (``PRC''). See Initiation of...-malleable cast iron pipe fittings from the PRC within the time limits mandated by section 751(a)(3)(A) of...

  20. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  1. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  2. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  3. 49 CFR 192.309 - Repair of steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Repair of steel pipe. 192.309 Section 192.309... Lines and Mains § 192.309 Repair of steel pipe. (a) Each imperfection or damage that impairs the serviceability of a length of steel pipe must be repaired or removed. If a repair is made by grinding, the...

  4. Increase of reliability of contact networks of electric transport, due to increase of strength of the joint unit of pipes of different diameters

    NASA Astrophysics Data System (ADS)

    Sabitov, L. S.; Kashapov, N. F.; Gilmanshin, I. R.; Gatiyatov, I. Z.; Kuznetsov, I. L.

    2017-09-01

    The feature of the stress state of the supports of the contact networks is the presence of a joint of pipes of different diameters, the ultimate state of which is determined, as a rule, the strength of the weld. The proposed unit allows to increase the reliability and strength of the connection and also exclude the presence of a weld bead on the outer surface of the pipe of smaller diameter in the place of its attachment to the upper end of the support ring.

  5. Visualisation of flow patterns in straight and C-shape thermosyphons

    NASA Astrophysics Data System (ADS)

    Ong, K. S.; Tshai, K. H.; Firwana, A.

    2017-04-01

    A heat pipe is a passive heat transfer device capable of transferring a large quantity of heat effectively and efficiently over a long distance and with a small temperature difference between the heat source and heat sink. A heat pipe consists of a metal pipe initially vacuumed and then filled with a small quantity of fluid inside. The pipe is separated into a heating (evaporator) section and a cooling (condenser) section by an adiabatic section. In a run-around-coil heating, ventilation and air conditioning system, a wrap-around heat pipe heat exchanger could be employed to increase dehumidification and to reduce cooling costs. The thermal performance of a thermosyphon is dependent upon type of fill liquid, fill ratio, power input, pipe inclination and pipe dimensions. The boiling and condensation processes that occur inside a thermosyphon are quite complex. During operation, dry-out, burn-out or boiling limit, entrainment or flooding limit and geysering occur. These phenomena would lead to non-uniform axial wall temperature distribution in the pipe, or worse still, ineffective operation. In order to have a better understanding of the internal heat transfer phenomena, a visual study using transparent glass tubes and high speed camera recording of the internal flow patterns would be most helpful. This paper reports on an experimental investigation conducted to visualise the flow patterns in straight and C-shape thermosyphons. The pictures recorded enabled the internal flow boiling and condensation pattern occurring inside a straight and a C-shape thermosyphon to be observed. The thermosyphons were fabricated from 10 mm O/D × 8 mm I/D × 300 mm long glass tubes and filled with water with fill ratios from 0.5 - 1.5. The evaporator sections of the thermosyphons were immersed into a hot water tank that was electrically heated from cold at ambient temperature till boiling. Cooling of the condenser section was achieved using a fan. Preliminary results showed that dry-out occurred earlier at lower evaporator temperatures with small fill ratios. Further investigations to determine saturation and thermosyphon wall temperatures with various fill liquids and at different fill ratios, inclinations and pipe sizes are necessary with a more sophisticated video recording system.

  6. 46 CFR 52.01-105 - Piping, valves and fittings (modifies PG-58 and PG-59).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 56.07-10 of this subchapter, except § 56.07-10(b); (2) Be included in the pipe stress calculations... equalizing the pressure before the valve is opened. (d) Feed connections. (1) Feed water shall not be discharged into a boiler against surfaces exposed to hot gases or radiant heat of the fire. (2) Feed water...

  7. 46 CFR 52.01-105 - Piping, valves and fittings (modifies PG-58 and PG-59).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 56.07-10 of this subchapter, except § 56.07-10(b); (2) Be included in the pipe stress calculations... equalizing the pressure before the valve is opened. (d) Feed connections. (1) Feed water shall not be discharged into a boiler against surfaces exposed to hot gases or radiant heat of the fire. (2) Feed water...

  8. 34. Photocopy of microfiched construction drawing by Galloway & Markwart ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of microfiched construction drawing by Galloway & Markwart Engineers, San Francisco, California, dated originally Jan. 23, 1917, with a revision dated April 20, 1917. (Microfiched drawing at the Denver Service Center, #104/60154 - 8 of 18) PENSTOCK PIPE, AIR VALVES - MAN HOLE - REDUCER & PIPE BENDS - EXPANSION JOINT & ANCHORS, 'Y' CONNECTION & BLIND FLANGE. - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA

  9. Miniature pipe crawler tractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKay, M.D.; Anderson, M.O.; Ferrante, T.A.

    2000-03-14

    A pipe crawler tractor may comprise a half tractor assembly having a first base drive wheel, a second base drive wheel, and a top drive wheel. The drive wheels are mounted in spaced-apart relation so that the top drive wheel is positioned between the first and second base drive wheels. The mounting arrangement is also such that the first and second base drive wheels contact the inside surface of the pipe at respective first and second positions and so that the top drive wheel contacts the inside surface of the pipe at a third position, the third position being substantiallymore » diametrically opposed to the first and second positions. A control system connected to the half tractor assembly controls the rotation of the first base wheel, the second base wheel, and the top drive wheel to move the half tractor assembly within the pipe.« less

  10. View north of building 16 section (left) and pipe coppersmith ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View north of building 16 section (left) and pipe coppersmith shop (Haer no. Pa-387-T) (right). Jet Lowe, Haer staff photographer, summer 1995 - Naval Base Philadelphia-Philadelphia Naval Shipyard, Machine Shops, League Island, Philadelphia, Philadelphia County, PA

  11. Progress of cryogenic pulsating heat pipes at UW-Madison

    NASA Astrophysics Data System (ADS)

    Diego Fonseca, Luis; Mok, Mason; Pfotenhauer, John; Miller, Franklin

    2017-12-01

    Space agencies continuously require innovative cooling systems that are lightweight, low powered, physically flexible, easily manufactured and, most importantly, exhibit high heat transfer rates. Therefore, Pulsating Heat Pipes (PHPs) are being investigated to provide these requirements. This paper summarizes the current development of cryogenic Pulsating Heat Pipes with single and multiple evaporator sections built and successfully tested at UW-Madison. Recently, a helium based Pulsating Heat Pipe with three evaporator and three condenser sections has been operated at fill ratios between 20 % and 80 % operating temperature range of 2.9 K to 5.19 K, resulting in a maximum effective thermal conductivity up to 50,000 W/m-K. In addition, a nitrogen Pulsating Heat Pipe has been built with three evaporator sections and one condenser section. This PHP achieved a thermal performance between 32,000 W/m-K and 96,000 W/m-K at fill ratio ranging from 50 % to 80 %. Split evaporator sections are very important in order to spread cooling throughout an object of interest with an irregular temperature distribution or where multiple cooling locations are required. Hence this type of configurations is a proof of concept which hasn’t been attempted before and if matured could be applied to cryo-propellant tanks, superconducting magnets and photon detectors.

  12. Experimental Investigation of Thermal Performance of Miniature Heat Pipe Using SiO2-Water Nanofluids.

    PubMed

    Niu, Yan-Fang; Zhao, Wei-Lin; Gong, Yu-Ying

    2015-04-01

    The four miniature heat pipes filled with DI water and SiO2-water nanofluids containing different volume concentrations (0.2%, 0.6% and 1.0%) are experimentally measured on the condition of air and water cooling. The wall temperature and the thermal resistance are investigated for three inclination angles. At the same of inlet heat water temperature in the heat system, it is observed that the total wall temperatures on the evaporator section are almost retaining constant by air cooling and the wall temperatures at the front end of the evaporator section are slightly reduced by water cooling. However, the wall temperatures at the condenser section using SiO2-water nanofluids are all higher than that for DI water on the two cooling conditions. As compared with the heat pipe using DI water, the decreasing of the thermal resistance in heat pipe using nanofluids is about 43.10%-74.46% by air cooling and 51.43%-72.22% by water cooling. These indicate that the utilization of SiO2-water nanofluids as working fluids enhances the performance of the miniature heat pipe. When the four miniature heat pipes are cut to examine at the end of the experiment, a thin coating on the surface of the screen mesh of the heat pipe using SiO2-water nanofluids is found. This may be one reason for reinforcing the heat transfer performance of the miniature heat pipe.

  13. Evaluation of tantalum 316 stainless steel transition joints

    NASA Technical Reports Server (NTRS)

    Stoner, D. R.

    1972-01-01

    Tubular transition joints providing a metallurgically bonded connection between tantalum and 316 stainless steel pipe sections were comparatively evaluated for durability under thermal cycling conditions approximating the operation of a SNAP-8 mercury boiler. Both coextruded and vacuum brazed transition joints of 50mm (2 inch) diameter were tested by thermal cycling 100 times between 730 C and 120 C(1350 F and 250 F) in a high vacuum environment. The twelve evaluated transition joints survived the full test sequence without developing leaks, although liquid penetrant bond line indications eventually developed in all specimens. The brazed transition joints exhibited the best dimensional stability and bond line durability.

  14. Laterally loaded pile cap connections.

    DOT National Transportation Integrated Search

    2010-08-01

    This study investigated the moment capacity and load-displacement response of the pile-to-cap connection details. Lateral load tests were conducted on four pile caps (3 ft H x 3 ft W x 6.5 ft L) with two 40 foot-long steel pipe piles (12.75 inch OD) ...

  15. Determinants of willingness to pay for improved water supply services in rural Kazakhstan

    NASA Astrophysics Data System (ADS)

    Tussupova, Kamshat

    2017-04-01

    The UN Sustainable development goals declare to provide water, sanitation and hygiene for all. The supply of affordable and safe water is a global priority and there is thus a requirement for a safe drinking water management and management of excreta disposal and wastewater. The current paper assesses the determinants of consumers' willingness to connect and pay (WTP) for the piped water in rural Kazakhstan. The results show that local villagers use water from different sources and at least three quarters of the respondents are willing to connect and use water from the piped water supply. The general defined determinants for WTP should be carefully considered among the different water users. Perceived water quality is a variable that is relevant for all water users. Other variables such as perceived reliability and the time-spent to collect water from the source, in-household treatment of water, and income perception are also significant but differently correlated with the WTP among different water users. Although, piped water is considered to be a safe system if properly managed, still some water users are reluctant to pay for the system and are satisfied with their current water supply and sanitation services. In this case, a proper management for the drinking water and wastewater and safe management of the excreta disposal should be supplied. It is recommended to include local water userś opinion as regard the willingness to connect and pay for the piped water system. The findings are of particular importance for policy-makers, water managers, engineers, and public health specialists.

  16. 49 CFR 230.62 - Dry pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Dry pipe. 230.62 Section 230.62 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Boilers and Appurtenances Steam Pipes § 230...

  17. Measurements of cross-sectional instantaneous phase distribution in gas-liquid pipe flow

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roitberg, E.; Shemer, L.; Barnea, D.

    Two novel complementing methods that enable experimental study of gas and liquid phases distribution in two-phase pipe flow are considered. The first measuring technique uses a wire-mesh sensor that, in addition to providing data on instantaneous phase distribution in the pipe cross-section, also allows measuring instantaneous propagation velocities of the phase interface. A novel algorithm for processing the wire-mesh sensor data is suggested to determine the instantaneous boundaries of gas-liquid interface. The second method applied here takes advantage of the existence of sharp visible boundaries between the two phases. This optical instrument is based on a borescope that is connectedmore » to a digital video camera. Laser light sheet illumination makes it possible to obtain images in the illuminated pipe cross-section only. It is demonstrated that the wire-mesh-derived results based on application of the new algorithm improve the effective spatial resolution of the instrument and are in agreement with those obtained using the borescope. Advantages and limitations of both measuring techniques for the investigations of cross-sectional instantaneous phase distribution in two-phase pipe flows are discussed. (author)« less

  18. Development of aerial ultrasonic source using cylinder typed vibrating plate with axial nodal mode

    NASA Astrophysics Data System (ADS)

    Asami, Takuya; Miura, Hikaru

    2018-07-01

    We developed a high-power aerial ultrasonic source with a cylinder typed vibrating plate combined with two rigid walls that can be directly connected to a pipe in order to solve the difficulty in connecting an ultrasonic source to a pipe containing particles while preventing the particles from leaking. The structure of the vibrating plate combined with two rigid walls that do not vibrate and can obtain a high sound pressure in the space inside the vibrating plate was designed using the finite element method (FEM). We found that the aerial ultrasonic source using the designed vibrating plate slightly vibrates at the rigid walls as designed using FEM and can be connected to other devices. In addition, the obtained sound pressure was around 8.0 kPa (172 dB) at an input electrical power of 7 W.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gupta, Prabhat Kumar; Rabehl, Roger

    Thermo-acoustic oscillations are a commonly observed phenomenon in helium cryogenic systems, especially in tubes connecting hot and cold areas. The open ends of these tubes are connected to the lower temperature (typically at 4.2 K), and the closed ends of these tubes are connected to the high temperature (300K). Cryogenic instrumentation installations provide ideal conditions for these oscillations to occur due to the steep temperature gradient along the tubing. These oscillations create errors in measurements as well as an undesirable heat load to the system. The work presented here develops engineering guidelines to design oscillation-free helium piping. This work alsomore » studies the effect of different piping inserts and shows how the proper geometrical combinations have to be chosen to avoid thermo-oscillations. The effect of an 80 K intercept is also studied and shows that thermo-oscillations can be dampened by placing the intercept at an appropriate location.« less

  20. Heat pipes and their use in technology

    NASA Technical Reports Server (NTRS)

    Vasilyev, L.

    1977-01-01

    Heat pipes may be employed as temperature regulators, heat diodes, transformers, storage batteries, or utilized for transforming thermal energy into mechanical, electric, or other forms of energy. General concepts were established for the analysis of the transfer process in heat pipes. A system of equations was developed to describe the thermodynamics of steam passage through a cross section of a heat pipe.

  1. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  2. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  3. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  4. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  5. 49 CFR 192.315 - Wrinkle bends in steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Wrinkle bends in steel pipe. 192.315 Section 192... Transmission Lines and Mains § 192.315 Wrinkle bends in steel pipe. (a) A wrinkle bend may not be made on steel... wrinkle bend on steel pipe must comply with the following: (1) The bend must not have any sharp kinks. (2...

  6. Underground pipeline laying using the pipe-in-pipe system

    NASA Astrophysics Data System (ADS)

    Antropova, N.; Krets, V.; Pavlov, M.

    2016-09-01

    The problems of resource saving and environmental safety during the installation and operation of the underwater crossings are always relevant. The paper describes the existing methods of trenchless pipeline technology, the structure of multi-channel pipelines, the types of supporting and guiding systems. The rational design is suggested for the pipe-in-pipe system. The finite element model is presented for the most dangerous sections of the inner pipes, the optimum distance is detected between the roller supports.

  7. Accounting For Compressibility In Viscous Flow In Pipes

    NASA Technical Reports Server (NTRS)

    Steinle, Frank W.; Gee, Ken; Murthy, Sreedhara V.

    1991-01-01

    Method developed to account for effects of compressibility in viscous flows through long, circular pipes of uniform diameter. Based on approximation of variations in density and velocity across pipe cross section by profile equations developed for boundary-layer flow between flat plates.

  8. NASA Lewis steady-state heat pipe code users manual

    NASA Technical Reports Server (NTRS)

    Tower, Leonard K.; Baker, Karl W.; Marks, Timothy S.

    1992-01-01

    The NASA Lewis heat pipe code was developed to predict the performance of heat pipes in the steady state. The code can be used as a design tool on a personal computer or with a suitable calling routine, as a subroutine for a mainframe radiator code. A variety of wick structures, including a user input option, can be used. Heat pipes with multiple evaporators, condensers, and adiabatic sections in series and with wick structures that differ among sections can be modeled. Several working fluids can be chosen, including potassium, sodium, and lithium, for which monomer-dimer equilibrium is considered. The code incorporates a vapor flow algorithm that treats compressibility and axially varying heat input. This code facilitates the determination of heat pipe operating temperatures and heat pipe limits that may be encountered at the specified heat input and environment temperature. Data are input to the computer through a user-interactive input subroutine. Output, such as liquid and vapor pressures and temperatures, is printed at equally spaced axial positions along the pipe as determined by the user.

  9. NASA Lewis steady-state heat pipe code users manual

    NASA Astrophysics Data System (ADS)

    Tower, Leonard K.; Baker, Karl W.; Marks, Timothy S.

    1992-06-01

    The NASA Lewis heat pipe code was developed to predict the performance of heat pipes in the steady state. The code can be used as a design tool on a personal computer or with a suitable calling routine, as a subroutine for a mainframe radiator code. A variety of wick structures, including a user input option, can be used. Heat pipes with multiple evaporators, condensers, and adiabatic sections in series and with wick structures that differ among sections can be modeled. Several working fluids can be chosen, including potassium, sodium, and lithium, for which monomer-dimer equilibrium is considered. The code incorporates a vapor flow algorithm that treats compressibility and axially varying heat input. This code facilitates the determination of heat pipe operating temperatures and heat pipe limits that may be encountered at the specified heat input and environment temperature. Data are input to the computer through a user-interactive input subroutine. Output, such as liquid and vapor pressures and temperatures, is printed at equally spaced axial positions along the pipe as determined by the user.

  10. Soil pipe flow tracer experiments: 1. Connectivity and transport characteristics

    USDA-ARS?s Scientific Manuscript database

    Much debate has occurred in catchment hydrology regarding the connectivity of flow paths from upslope areas to catchment outlets. This study was conducted in two catchments, one with three upper branches, in a loess soil with a fragipan that fosters lateral flow and exhibits an extensive distributio...

  11. 40 CFR 191.22 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... this part. Public water system means a system for the provision to the public of piped water for human consumption, if such system has at least fifteen service connections or regularly serves at least twenty-five... control of the operator of such system and used primarily in connection with such system; and (2) Any...

  12. 40 CFR 191.22 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this part. Public water system means a system for the provision to the public of piped water for human consumption, if such system has at least fifteen service connections or regularly serves at least twenty-five... control of the operator of such system and used primarily in connection with such system; and (2) Any...

  13. 40 CFR 60.481 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... bypassing of equipment without stopping production. Quarter means a 3-month period; the first quarter... process. Connector means flanged, screwed, or other joined fittings used to connect two pipe lines or a... means two block valves connected in series with a bleed valve or line that can vent the line between the...

  14. 40 CFR 60.481 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bypassing of equipment without stopping production. Quarter means a 3-month period; the first quarter... process. Connector means flanged, screwed, or other joined fittings used to connect two pipe lines or a... means two block valves connected in series with a bleed valve or line that can vent the line between the...

  15. 40 CFR 60.481 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bypassing of equipment without stopping production. Quarter means a 3-month period; the first quarter... process. Connector means flanged, screwed, or other joined fittings used to connect two pipe lines or a... means two block valves connected in series with a bleed valve or line that can vent the line between the...

  16. 40 CFR 60.481 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... bypassing of equipment without stopping production. Quarter means a 3-month period; the first quarter... process. Connector means flanged, screwed, or other joined fittings used to connect two pipe lines or a... means two block valves connected in series with a bleed valve or line that can vent the line between the...

  17. 40 CFR 60.481 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... bypassing of equipment without stopping production. Quarter means a 3-month period; the first quarter... process. Connector means flanged, screwed, or other joined fittings used to connect two pipe lines or a... means two block valves connected in series with a bleed valve or line that can vent the line between the...

  18. 29 CFR 1915.163 - Ship's piping systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are taken: (1) The isolation and shutoff valves connecting the dead system with the live system or.... Where valves are welded instead of bolted at least two isolation and shutoff valves connecting the dead... atmosphere on all of the dead interconnecting systems shall be opened for visual observation of drainage. [47...

  19. 29 CFR 1915.163 - Ship's piping systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... are taken: (1) The isolation and shutoff valves connecting the dead system with the live system or.... Where valves are welded instead of bolted at least two isolation and shutoff valves connecting the dead... atmosphere on all of the dead interconnecting systems shall be opened for visual observation of drainage. [47...

  20. Electron Cloud in Steel Beam Pipe vs Titanium Nitride Coated and Amorphous Carbon Coated Beam Pipes in Fermilab's Main Injector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Backfish, Michael

    This paper documents the use of four retarding field analyzers (RFAs) to measure electron cloud signals created in Fermilab’s Main Injector during 120 GeV operations. The first data set was taken from September 11, 2009 to July 4, 2010. This data set is used to compare two different types of beam pipe that were installed in the accelerator. Two RFAs were installed in a normal steel beam pipe like the rest of the Main Injector while another two were installed in a one meter section of beam pipe that was coated on the inside with titanium nitride (TiN). A secondmore » data run started on August 23, 2010 and ended on January 10, 2011 when Main Injector beam intensities were reduced thus eliminating the electron cloud. This second run uses the same RFA setup but the TiN coated beam pipe was replaced by a one meter section coated with amorphous carbon (aC). This section of beam pipe was provided by CERN in an effort to better understand how an aC coating will perform over time in an accelerator. The research consists of three basic parts: (a) continuously monitoring the conditioning of the three different types of beam pipe over both time and absorbed electrons (b) measurement of the characteristics of the surrounding magnetic fields in the Main Injector in order to better relate actual data observed in the Main Injector with that of simulations (c) measurement of the energy spectrum of the electron cloud signals using retarding field analyzers in all three types of beam pipe.« less

  1. Fabricating cooled electronic system with liquid-cooled cold plate and thermal spreader

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chainer, Timothy J.; Graybill, David P.; Iyengar, Madhusudan K.

    Methods are provided for facilitating cooling of an electronic component. The method includes providing a liquid-cooled cold plate and a thermal spreader associated with the cold plate. The cold plate includes multiple coolant-carrying channel sections extending within the cold plate, and a thermal conduction surface with a larger surface area than a surface area of the component to be cooled. The thermal spreader includes one or more heat pipes including multiple heat pipe sections. One or more heat pipe sections are partially aligned to a first region of the cold plate, that is, where aligned to the surface to bemore » cooled, and partially aligned to a second region of the cold plate, which is outside the first region. The one or more heat pipes facilitate distribution of heat from the electronic component to coolant-carrying channel sections of the cold plate located in the second region of the cold plate.« less

  2. Fabricating cooled electronic system with liquid-cooled cold plate and thermal spreader

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chainer, Timothy J.; Graybill, David P.; Iyengar, Madhusudan K.

    Methods are provided for facilitating cooling of an electronic component. The methods include providing a liquid-cooled cold plate and a thermal spreader associated with the cold plate. The cold plate includes multiple coolant-carrying channel sections extending within the cold plate, and a thermal conduction surface with a larger surface area than a surface area of the component to be cooled. The thermal spreader includes one or more heat pipes including multiple heat pipe sections. One or more heat pipe sections are partially aligned to a first region of the cold plate, that is, where aligned to the surface to bemore » cooled, and partially aligned to a second region of the cold plate, which is outside the first region. The one or more heat pipes facilitate distribution of heat from the electronic component to coolant-carrying channel sections of the cold plate located in the second region of the cold plate.« less

  3. Cooled electronic system with liquid-cooled cold plate and thermal spreader coupled to electronic component

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chainer, Timothy J.; Graybill, David P.; Iyengar, Madhusudan K.

    Apparatus and method are provided for facilitating cooling of an electronic component. The apparatus includes a liquid-cooled cold plate and a thermal spreader associated with the cold plate. The cold plate includes multiple coolant-carrying channel sections extending within the cold plate, and a thermal conduction surface with a larger surface area than a surface area of the component to be cooled. The thermal spreader includes one or more heat pipes including multiple heat pipe sections. One or more heat pipe sections are partially aligned to a first region of the cold plate, that is, where aligned to the surface tomore » be cooled, and partially aligned to a second region of the cold plate, which is outside the first region. The one or more heat pipes facilitate distribution of heat from the electronic component to coolant-carrying channel sections of the cold plate located in the second region of the cold plate.« less

  4. Cooled electronic system with liquid-cooled cold plate and thermal spreader coupled to electronic component

    DOEpatents

    Chainer, Timothy J.; Graybill, David P.; Iyengar, Madhusudan K.; Kamath, Vinod; Kochuparambil, Bejoy J.; Schmidt, Roger R.; Steinke, Mark E.

    2016-08-09

    Apparatus and method are provided for facilitating cooling of an electronic component. The apparatus includes a liquid-cooled cold plate and a thermal spreader associated with the cold plate. The cold plate includes multiple coolant-carrying channel sections extending within the cold plate, and a thermal conduction surface with a larger surface area than a surface area of the component to be cooled. The thermal spreader includes one or more heat pipes including multiple heat pipe sections. One or more heat pipe sections are partially aligned to a first region of the cold plate, that is, where aligned to the surface to be cooled, and partially aligned to a second region of the cold plate, which is outside the first region. The one or more heat pipes facilitate distribution of heat from the electronic component to coolant-carrying channel sections of the cold plate located in the second region of the cold plate.

  5. Cooled electronic system with liquid-cooled cold plate and thermal spreader coupled to electronic component

    DOEpatents

    Chainer, Timothy J.; Graybill, David P.; Iyengar, Madhusudan K.; Kamath, Vinod; Kochuparambil, Bejoy J.; Schmidt, Roger R.; Steinke, Mark E.

    2016-04-05

    Apparatus and method are provided for facilitating cooling of an electronic component. The apparatus includes a liquid-cooled cold plate and a thermal spreader associated with the cold plate. The cold plate includes multiple coolant-carrying channel sections extending within the cold plate, and a thermal conduction surface with a larger surface area than a surface area of the component to be cooled. The thermal spreader includes one or more heat pipes including multiple heat pipe sections. One or more heat pipe sections are partially aligned to a first region of the cold plate, that is, where aligned to the surface to be cooled, and partially aligned to a second region of the cold plate, which is outside the first region. The one or more heat pipes facilitate distribution of heat from the electronic component to coolant-carrying channel sections of the cold plate located in the second region of the cold plate.

  6. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  7. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  8. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  9. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  10. Automatic Target Recognition Using Nonlinear Autoregressive Neural Networks

    DTIC Science & Technology

    2014-03-27

    Lee and Chang (2009) employed a NARXNet for studying the thermodynamics in a pulsating heat pipe (PHP), a type of cooling device which contains...in Thermal Dynamics Identifcation of a Pulsating Heat Pipe . Energy Consversion and Management, 1069-1078. Lisboa, P. J. (2002). A review of...function by adjusting the values of the connections between elements. This flexibility allows ANNs to perform complex functions in fields to include

  11. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... cargo tanks; or (2) Within or on the boundaries of fuel tanks; or (3) To pipe lines, heating coils...

  12. 14 CFR 29.1123 - Exhaust piping.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Exhaust piping. 29.1123 Section 29.1123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... piping must be heat and corrosion resistant, and must have provisions to prevent failure due to expansion...

  13. 14 CFR 29.1123 - Exhaust piping.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Exhaust piping. 29.1123 Section 29.1123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... piping must be heat and corrosion resistant, and must have provisions to prevent failure due to expansion...

  14. 14 CFR 29.1123 - Exhaust piping.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Exhaust piping. 29.1123 Section 29.1123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... piping must be heat and corrosion resistant, and must have provisions to prevent failure due to expansion...

  15. 14 CFR 29.1123 - Exhaust piping.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Exhaust piping. 29.1123 Section 29.1123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... piping must be heat and corrosion resistant, and must have provisions to prevent failure due to expansion...

  16. 14 CFR 29.1123 - Exhaust piping.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Exhaust piping. 29.1123 Section 29.1123 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... piping must be heat and corrosion resistant, and must have provisions to prevent failure due to expansion...

  17. 75 FR 877 - Drill Pipe From China

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... Pipe From China AGENCY: International Trade Commission. ACTION: Institution of antidumping and... States is materially retarded, by reason of imports from China of drill pipe, provided for in subheadings... Government of China. Unless the Department of Commerce extends the time for initiation pursuant to sections...

  18. Heat pipe methanator

    DOEpatents

    Ranken, William A.; Kemme, Joseph E.

    1976-07-27

    A heat pipe methanator for converting coal gas to methane. Gravity return heat pipes are employed to remove the heat of reaction from the methanation promoting catalyst, transmitting a portion of this heat to an incoming gas pre-heat section and delivering the remainder to a steam generating heat exchanger.

  19. 46 CFR 56.50-85 - Tank-vent piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-control systems or other, equivalent means, together with gauging devices and procedures for filling cargo... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-85 Tank-vent piping. (a) This section...

  20. Effects of Urban Stormwater Infrastructure and Spatial Scale on Nutrient Export and Runoff from Semi-Arid Urban Catchments

    NASA Astrophysics Data System (ADS)

    Hale, R. L.; Turnbull, L.; Earl, S.; Grimm, N. B.

    2011-12-01

    There has been an abundance of literature on the effects of urbanization on downstream ecosystems, particularly due to changes in nutrient inputs as well as hydrology. Less is known, however, about nutrient transport processes and processing in urban watersheds. Engineered drainage systems are likely to play a significant role in controlling the transport of water and nutrients downstream, and variability in these systems within and between cities may lead to differences in the effects of urbanization on downstream ecosystems over time and space. We established a nested stormwater sampling network with 12 watersheds ranging in scale from 5 to 17000 ha in the Indian Bend Wash watershed in Scottsdale, AZ. Small (<200ha) watersheds had uniform land cover (medium density residential), but were drained by a variety of stormwater infrastructure including surface runoff, pipes, natural or modified washes, and retention basins. At the outlet of each of these catchments we monitored rainfall and discharge, and sampled stormwater throughout runoff events for dissolved nitrogen (N), phosphorus (P), and organic carbon (oC). Urban stormwater infrastructure is characterized by a range of hydrologic connectivity. Piped watersheds are highly connected and runoff responds linearly to rainfall events, in contrast to watersheds drained with retention basins and washes, where runoff exhibits a nonlinear threshold response to rainfall events. Nutrient loads from piped watersheds scale linearly with total storm rainfall. Because of frequent flushing, nutrient concentrations from these sites are lower than from wash and retention basin drained sites and total nutrient loads exhibit supply limitation, e.g., nutrient loads are poorly predicted by storm rainfall and are strongly controlled by factors that determine the amount of nutrients stored within the watershed, such as antecedent dry days. In contrast, wash and retention basin-drained watersheds exhibit transport limitation. These watersheds flow less frequently than pipe-drained sites and therefore stormwater has higher concentrations of nutrients, although total loads are significantly lower. Nonlinearities in cross-storm rainfall-nutrient loading relationships for the wash and retention basin watersheds suggest that these systems may become supply limited during large rain events. Results show that characteristics of the hydrologic network such as hydrologic connectivity mediate terrestrial-aquatic linkages. Specifically, we see that increased hydrologic connectivity, as in the piped watershed, actually decreases the predictive power of storm size with regard to nutrient export, whereas nutrient loads from poorly connected watersheds are strongly predicted by storm size.

  1. An improved algorithm for the modeling of vapor flow in heat pipes

    NASA Technical Reports Server (NTRS)

    Tower, Leonard K.; Hainley, Donald C.

    1989-01-01

    A heat pipe vapor flow algorithm suitable for use in codes on microcomputers is presented. The incompressible heat pipe vapor flow studies of Busse are extended to incorporate compressibility effects. The Busse velocity profile factor is treated as a function of temperature and pressure. The assumption of a uniform saturated vapor temperature determined by the local pressure at each cross section of the pipe is not made. Instead, a mean vapor temperature, defined by an energy integral, is determined in the course of the solution in addition to the pressure, saturation temperature at the wall, and the Busse velocity profile factor. For alkali metal working fluids, local species equilibrium is assumed. Temperature and pressure profiles are presented for several cases involving sodium heat pipes. An example for a heat pipe with an adiabatic section and two evaporators in sequence illustrates the ability to handle axially varying heat input. A sonic limit plot for a short evaporator falls between curves for the Busse and Levy inviscid sonic limits.

  2. An improved algorithm for the modeling of vapor flow in heat pipes

    NASA Astrophysics Data System (ADS)

    Tower, Leonard K.; Hainley, Donald C.

    1989-12-01

    A heat pipe vapor flow algorithm suitable for use in codes on microcomputers is presented. The incompressible heat pipe vapor flow studies of Busse are extended to incorporate compressibility effects. The Busse velocity profile factor is treated as a function of temperature and pressure. The assumption of a uniform saturated vapor temperature determined by the local pressure at each cross section of the pipe is not made. Instead, a mean vapor temperature, defined by an energy integral, is determined in the course of the solution in addition to the pressure, saturation temperature at the wall, and the Busse velocity profile factor. For alkali metal working fluids, local species equilibrium is assumed. Temperature and pressure profiles are presented for several cases involving sodium heat pipes. An example for a heat pipe with an adiabatic section and two evaporators in sequence illustrates the ability to handle axially varying heat input. A sonic limit plot for a short evaporator falls between curves for the Busse and Levy inviscid sonic limits.

  3. Pipe crawler with extendable legs

    DOEpatents

    Zollinger, William T.

    1992-01-01

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long a leg assembly is wide and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler.

  4. Pipe crawler with extendable legs

    DOEpatents

    Zollinger, W.T.

    1992-06-16

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is wide and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler. 8 figs.

  5. Reynolds-Stress and Triple-Product Models Applied to a Flow with Rotation and Curvature

    NASA Technical Reports Server (NTRS)

    Olsen, Michael E.

    2016-01-01

    Turbulence models, with increasing complexity, up to triple product terms, are applied to the flow in a rotating pipe. The rotating pipe is a challenging case for turbulence models as it contains significant rotational and curvature effects. The flow field starts with the classic fully developed pipe flow, with a stationary pipe wall. This well defined condition is then subjected to a section of pipe with a rotating wall. The rotating wall introduces a second velocity scale, and creates Reynolds shear stresses in the radial-circumferential and circumferential-axial planes. Furthermore, the wall rotation introduces a flow stabilization, and actually reduces the turbulent kinetic energy as the flow moves along the rotating wall section. It is shown in the present work that the Reynolds stress models are capable of predicting significant reduction in the turbulent kinetic energy, but triple product improves the predictions of the centerline turbulent kinetic energy, which is governed by convection, dissipation and transport terms, as the production terms vanish on the pipe axis.

  6. 46 CFR 52.01-105 - Piping, valves and fittings (modifies PG-58 and PG-59).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Piping, valves and fittings (modifies PG-58 and PG-59). 52.01-105 Section 52.01-105 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements § 52.01-105 Piping, valves and fittings (modifies PG-58 and PG-59). (a) Boiler external piping within...

  7. 46 CFR 52.01-105 - Piping, valves and fittings (modifies PG-58 and PG-59).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Piping, valves and fittings (modifies PG-58 and PG-59). 52.01-105 Section 52.01-105 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements § 52.01-105 Piping, valves and fittings (modifies PG-58 and PG-59). (a) Boiler external piping within...

  8. 46 CFR 52.01-105 - Piping, valves and fittings (modifies PG-58 and PG-59).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Piping, valves and fittings (modifies PG-58 and PG-59). 52.01-105 Section 52.01-105 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements § 52.01-105 Piping, valves and fittings (modifies PG-58 and PG-59). (a) Boiler external piping within...

  9. Kimberlite Wall Rock Fragmentation: Venetia K08 Pipe Development

    NASA Astrophysics Data System (ADS)

    Barnett, W.; Kurszlaukis, S.; Tait, M.; Dirks, P.

    2009-05-01

    Volcanic systems impose powerful disrupting forces on the country rock into which they intrude. The nature of the induced brittle deformation or fragmentation can be characteristic of the volcanic processes ongoing within the volcanic system, but are most typically partially removed or obscured by repeated, overprinting volcanic activity in mature pipes. Incompletely evolved pipes may therefore provide important evidence for the types and stages of wall rock fragmentation, and mechanical processes responsible for the fragmentation. Evidence for preserved stages of fragmentation is presented from a detailed study of the K08 pipe within the Cambrian Venetia kimberlite cluster, South Africa. This paper investigates the growth history of the K08 pipe and the mechanics of pipe development based on observations in the pit, drill core and thin sections, from geochemical analyses, particle size distribution analyses, and 3D modeling. Present open pit exposures of the K08 pipe comprise greater than 90% mega-breccia of country rock clasts (gneiss and schist) with <10% intruding, coherent kimberlite. Drill core shows that below about 225 m the CRB includes increasing quantities of kimberlite. The breccia clasts are angular, clast-supported with void or carbonate cement between the clasts. Average clast sizes define sub-horizontal layers tens of metres thick across the pipe. Structural and textural observations indicate the presence of zones of re-fragmentation or zones of brittle shearing. Breccia textural studies and fractal statistics on particle size distributions (PSD) is used to quantify sheared and non- sheared breccia zones. The calculated energy required to form the non-sheared breccia PSD implies an explosive early stage of fragmentation that pre-conditions the rock mass. The pre-conditioning would have been caused by explosions that are either phreatic or phreatomagmatic in nature. The explosions are likely to have been centered on a dyke, or pulses of preceding volatile-fluid phases, which have encountered a local hydrologically active fault. The explosions were inadequate in mechanical energy release (72% of a mine production blast) to eject material from the pipe, and the pipe may not have breached surface. The next stage of fragmentation is interpreted to have been an upward-moving collapse of the pre-conditioned hanging wall of a subterranean volcanic excavation. This would explain the mega-scale layering across the width of the breccia pipe. It must be questioned whether the preserved K08 architecture represents early pipe development in general, or is a special case of a late pipe geometry modification process. Previous literature describes sidewall and hanging wall caving processes elsewhere in the Venetia cluster and other kimberlites world wide. A requirement for emplacement models that include upward pipe growth processes is the availability of space (mass deficit at depth) into which the caving and/or dilating breccia can expand. It is possible that K08 might be connected to adjacent K02 at a depth somewhere below 400m, which would explain the presence of volcaniclastic kimberlite at depth within the K08 pipe. K08 is likely an incomplete ancillary sideward development to K02. The latest stage of brecciation is quantified through an observed evolution in the fractal dimension of the PSD. It is interpreted to be due to complex adjustments in volume in the pipe causing shearing and re-fragmentation of the breccia.

  10. Hydroperiod enhancement using underground pipes for the efficient removal of hypersaline conditions in a semiarid coastal lagoon

    NASA Astrophysics Data System (ADS)

    Flores-Verdugo, Francisco; Ramírez-Barrón, Eduardo; Flores-de-Santiago, Francisco

    2018-06-01

    Pore-water hypersaline conditions are common in semiarid coastlines where freshwater availability is limited. Hence, hydroperiod (or flood regime), contributes to the regular supply of new water enhancing mangrove survival and growth. The purpose of this investigation was to assess pore-water salinity and hydroperiod variability of basin mangrove distribution by installing three underground PVC (polyvinyl chloride) pipes connected to the main tidal channel. All pipes were placed perpendicular to the main channel for an annual cycle. Results indicated hydroperiod enhancement at the location of the underground pipes, compared to control stations. Overall, spring tides and rainy season played a key role in temporal hydroperiod variability. Indeed, the interior structure of the pipes allows rapid and continuous intrusion of new water into the saltpan during flood and ebb currents. After three months, pore-water salinity of 170 in the saltpan area was reduced to 80 at a distance of 2 m from the underground pipes. This study shows the applicability of underground pipes for the efficient removal of hypersaline conditions by enhancing tidal flow for possible recruitment of mangrove propagules in semiarid coastlines.

  11. Pilot Test of Hot Gas Decontamination of Explosives-Contaminated Equipment at Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada. Appendices. Revision

    DTIC Science & Technology

    1990-06-01

    was used to spike the following items of equipment: 0 powder boxes o steam-heated risers o steam-heated discharge valves o steel pipe o aluminum pipe...expose it to the internal surfaces. For pipe ( aluminum and steel), one end of the pipe section was covered with parafilm wax. Spike solution was added...spike the following items of equipment: "o powder box "o steam-heated riser "o steam-heated discharge valve "O steel pipe "o aluminum pipe Prior to

  12. 46 CFR 56.04-10 - Other systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...

  13. 46 CFR 56.04-10 - Other systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...

  14. 46 CFR 56.04-10 - Other systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...

  15. 46 CFR 56.04-10 - Other systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...

  16. 46 CFR 56.30-3 - Piping joints (reproduces 110).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Piping joints (reproduces 110). 56.30-3 Section 56.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... joint tightness, mechanical strength and the nature of the fluid handled. ...

  17. 46 CFR 56.30-3 - Piping joints (reproduces 110).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Piping joints (reproduces 110). 56.30-3 Section 56.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... joint tightness, mechanical strength and the nature of the fluid handled. ...

  18. 46 CFR 56.30-3 - Piping joints (reproduces 110).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Piping joints (reproduces 110). 56.30-3 Section 56.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... joint tightness, mechanical strength and the nature of the fluid handled. ...

  19. 46 CFR 56.30-3 - Piping joints (reproduces 110).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Piping joints (reproduces 110). 56.30-3 Section 56.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... joint tightness, mechanical strength and the nature of the fluid handled. ...

  20. 46 CFR 56.30-3 - Piping joints (reproduces 110).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Piping joints (reproduces 110). 56.30-3 Section 56.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... joint tightness, mechanical strength and the nature of the fluid handled. ...

  1. 46 CFR 111.106-17 - Piping: electrical bonding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Piping: electrical bonding. 111.106-17 Section 111.106-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Hazardous Locations on OSVs § 111.106-17 Piping: electrical bonding. (a...

  2. Lead Pipe Scale Analysis Using Broad-Beam Argon Ion Milling to Elucidate Drinking Water Corrosion

    EPA Science Inventory

    Herein, we compared the characterization of lead pipe scale removed from a drinking water distribution system using two different cross section methods (conventional polishing and argon ion beam etching). The pipe scale solids were analyzed using scanning electron microscopy (SEM...

  3. 46 CFR 58.20-20 - Refrigeration piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Refrigeration piping. 58.20-20 Section 58.20-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY... chemical and physical properties as to remain ductile at the lowest operating temperature. (b) Piping...

  4. 46 CFR 58.20-20 - Refrigeration piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Refrigeration piping. 58.20-20 Section 58.20-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY... chemical and physical properties as to remain ductile at the lowest operating temperature. (b) Piping...

  5. 46 CFR 58.20-20 - Refrigeration piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Refrigeration piping. 58.20-20 Section 58.20-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY... chemical and physical properties as to remain ductile at the lowest operating temperature. (b) Piping...

  6. 46 CFR 58.20-20 - Refrigeration piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Refrigeration piping. 58.20-20 Section 58.20-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY... chemical and physical properties as to remain ductile at the lowest operating temperature. (b) Piping...

  7. 46 CFR 58.20-20 - Refrigeration piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Refrigeration piping. 58.20-20 Section 58.20-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY... chemical and physical properties as to remain ductile at the lowest operating temperature. (b) Piping...

  8. 46 CFR 56.04-10 - Other systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Other systems. 56.04-10 Section 56.04-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Piping Classification § 56.04-10 Other systems. Piping systems and appurtenances not requiring plan...

  9. Fluid flow analysis of E-glass fiber reinforced pipe joints in oil and gas industry

    NASA Astrophysics Data System (ADS)

    Bobba, Sujith; Leman, Z.; Zainuddin, E. S.; Sapuan, S. M.

    2018-04-01

    Glass Fiber reinforced composites have become increasingly important over the past few years and now they are the first choice materials for fabricating pipes with low weight in combination with high strength and stiffness. In Oil And Gas Industry, The Pipelines transporting heavy crude oil are subjected to variable pressure waves causing fluctuating stress levels in the pipes. Computational Fluid Dynamics (CFD) analysis was performed using solid works flow stimulation software to study the effects of these pressure waves on some specified joints in the pipes. Depending on the type of heavy crude oil being used, the flow behavior indicated a considerable degree of stress levels in certain connecting joints, causing the joints to become weak over a prolonged period of use. This research proposes a new perspective that is still required to be developed regarding the change of the pipe material, fiber winding angle in those specified joints and finally implementing cad wind technology to check the output result of the stress levels so that the life of the pipes can be optimized.

  10. Thermoelectric Power Generation System for Future Hybrid Vehicles Using Hot Exhaust Gas

    NASA Astrophysics Data System (ADS)

    Kim, Sun-Kook; Won, Byeong-Cheol; Rhi, Seok-Ho; Kim, Shi-Ho; Yoo, Jeong-Ho; Jang, Ju-Chan

    2011-05-01

    The present experimental and computational study investigates a new exhaust gas waste heat recovery system for hybrid vehicles, using a thermoelectric module (TEM) and heat pipes to produce electric power. It proposes a new thermoelectric generation (TEG) system, working with heat pipes to produce electricity from a limited hot surface area. The current TEG system is directly connected to the exhaust pipe, and the amount of electricity generated by the TEMs is directly proportional to their heated area. Current exhaust pipes fail to offer a sufficiently large hot surface area for the high-efficiency waste heat recovery required. To overcome this, a new TEG system has been designed to have an enlarged hot surface area by the addition of ten heat pipes, which act as highly efficient heat transfer devices and can transmit the heat to many TEMs. As designed, this new waste heat recovery system produces a maximum 350 W when the hot exhaust gas heats the evaporator surface of the heat pipe to 170°C; this promises great possibilities for application of this technology in future energy-efficient hybrid vehicles.

  11. Measurement of electrodynamics characteristics of higher order modes for harmonic cavity at 2400 MHz

    NASA Astrophysics Data System (ADS)

    Shashkov, Ya V.; Sobenin, N. P.; Gusarova, M. A.; Lalayan, M. V.; Bazyl, D. S.; Donetskiy, R. V.; Orlov, A. I.; Zobov, M. M.; Zavadtsev, A. A.

    2016-09-01

    In the frameworks of the High Luminosity Large Hadron Collider (HL-LHC) upgrade program an application of additional superconducting harmonic cavities operating at 800 MHz is currently under discussion. As a possible candidate, an assembly of two cavities with grooved beam pipes connected by a drift tube and housed in a common cryomodule, was proposed. In this article we discuss measurements of loaded Q-factors of higher order modes (HOM) performed on a scaled aluminium single cell cavity prototype with the fundamental frequency of 2400 MHz and on an array of two such cavities connected by a narrow beam pipe. The measurements were performed for the system with and without the matching load in the drift tube..

  12. Fabrication and Testing of a Leading-Edge-Shaped Heat Pipe

    NASA Technical Reports Server (NTRS)

    Glass, David E.; Merrigan, Michael A.; Sena, J. Tom; Reid, Robert S.

    1998-01-01

    The development of a refractory-composite/heat-pipe-cooled leading edge has evolved from the design stage to the fabrication and testing of a full size, leading-edge-shaped heat pipe. The heat pipe had a 'D-shaped' cross section and was fabricated from arc cast Mo-4lRe. An artery was included in the wick. Several issues were resolved with the fabrication of the sharp leading edge radius heat pipe. The heat pipe was tested in a vacuum chamber at Los Alamos National Laboratory using induction heating and was started up from the frozen state several times. However, design temperatures and heat fluxes were not obtained due to premature failure of the heat pipe resulting from electrical discharge between the induction heating apparatus and the heat pipe. Though a testing anomaly caused premature failure of the heat pipe, successful startup and operation of the heat pipe was demonstrated.

  13. Field investigation on structural performance of the buried UPVC pipes with and without geogrid reinforcement

    NASA Astrophysics Data System (ADS)

    Teja, Akkineni Surya; Rajkumar, R.; Gokula Krishnan, B.; Aravindh, R.

    2018-02-01

    Buried pipes are used mainly for water supply and drainage besides many other applications such as oil, liquefied natural gas, coal slurries and mine tailings. The pipes used may be rigid (reinforced concrete, vitrified clay and ductile iron) or flexible (Steel, UPVC, aluminium, Fiber glass and High-density polyethylene) although the distinction between them is blurring. Flexible pipe design is governed by deflection or buckling. UPVC pipes are preferred due to light weight, long term chemical stability and cost efficiency. This project aims to study the load deformation behaviour of the buried pipe and stress variation across the cross section of the pipe under static loading along with the influence of depth of embedment, density of backfill on the deformation and stresses in pipe and the deformation behaviour of buried pipe when soil is reinforced with geogrid reinforcement and evaluate the structural performance of the pipe.

  14. 49 CFR 177.837 - Class 3 materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or... interconnected.) This connection must be made before any filling hole is opened, and must remain in place until after the last filling hole has been closed. Additional bond wires are not needed around All-Metal...

  15. 49 CFR 177.837 - Class 3 materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or... interconnected.) This connection must be made before any filling hole is opened, and must remain in place until after the last filling hole has been closed. Additional bond wires are not needed around All-Metal...

  16. 49 CFR 177.837 - Class 3 materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or... interconnected.) This connection must be made before any filling hole is opened, and must remain in place until after the last filling hole has been closed. Additional bond wires are not needed around All-Metal...

  17. 24 CFR 3280.610 - Drainage systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... foot, when a full size cleanout is installed at the upper end. [40 FR 58752, Dec. 18, 1975... shall be designed to provide for a 1/4 inch per foot grade in horizontal piping. (i) Fittings for screw..., correctly located according to the size and type of fixture to be connected. (1) Water closet connection...

  18. 24 CFR 3280.610 - Drainage systems.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... diameter piping shall be required for water closets. (f) Wet-vented drainage system. Plumbing fixture traps... connected to the drainage system shall be installed with a water seal trap (§ 3280.606(a)). (2) The drainage... to which it is connected and shall be equipped with a water-tight cap or plug matching the drain...

  19. 49 CFR 177.837 - Class 3 materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or integrally connected steel framing, and the other end to the shell of the cargo tank to provide a continuous... after the last filling hole has been closed. Additional bond wires are not needed around All-Metal...

  20. 49 CFR 177.837 - Class 3 materials.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through an open filling hole, one end of a bond wire shall be connected to the stationary system piping or integrally connected steel framing, and the other end to the shell of the cargo tank to provide a continuous... after the last filling hole has been closed. Additional bond wires are not needed around All-Metal...

  1. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bill Bruce; Nancy Porter; George Ritter

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.« less

  2. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Ian Harris

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.« less

  3. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Ian Harris

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, undermore » congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.« less

  4. SOLID STATE SENSOR FOR INSPECTION OF PRESTRESSED CONCRETE PRESSURE PIPE - PHASE I

    EPA Science Inventory

     

    An important type of water pipe is the Prestressed Concrete Cylinder Pipe (PCCP). There are thousands of miles of PCCP installed in the United States in sections with lengths up to 20 feet an...

  5. 269. Photocopy of drawing (1981 piping drawing by StearnsRoger Incorporated) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    269. Photocopy of drawing (1981 piping drawing by Stearns-Roger Incorporated) ATLAS H CONVERSION; PLANS, SECTIONS, AND DETAILS FOR FUEL AND NITROGEN PIPING, SHEET 517-P3 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 46 CFR 28.835 - Fuel systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... this section, fuel piping shall be steel pipe, annealed seamless copper, brass, nickel copper, or... with wire braid; (4) Be fitted with suitable, corrosion resistant, compression fittings; and (5) Be... above 260° C (500 °F) must be of seamless steel. (l) Existing fuel oil piping may remain in service as...

  7. 30 CFR 75.1101-12 - Equivalent dry-pipe system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...

  8. 30 CFR 75.1101-12 - Equivalent dry-pipe system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...

  9. 30 CFR 75.1101-12 - Equivalent dry-pipe system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...

  10. 30 CFR 75.1101-12 - Equivalent dry-pipe system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...

  11. 30 CFR 75.1101-12 - Equivalent dry-pipe system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-12 Equivalent dry-pipe system. Where water sprinkler systems are installed to protect main and secondary belt... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Equivalent dry-pipe system. 75.1101-12 Section...

  12. 14 CFR 252.15 - Cigars and pipes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Cigars and pipes. 252.15 Section 252.15 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS SMOKING ABOARD AIRCRAFT § 252.15 Cigars and pipes. Air carriers shall prohibit the smoking of...

  13. 14 CFR 252.15 - Cigars and pipes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Cigars and pipes. 252.15 Section 252.15 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS SMOKING ABOARD AIRCRAFT § 252.15 Cigars and pipes. Air carriers shall prohibit the smoking of...

  14. 14 CFR 252.15 - Cigars and pipes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Cigars and pipes. 252.15 Section 252.15 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS SMOKING ABOARD AIRCRAFT § 252.15 Cigars and pipes. Air carriers shall prohibit the smoking of...

  15. 14 CFR 252.15 - Cigars and pipes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Cigars and pipes. 252.15 Section 252.15 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS SMOKING ABOARD AIRCRAFT § 252.15 Cigars and pipes. Air carriers shall prohibit the smoking of...

  16. 14 CFR 252.15 - Cigars and pipes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Cigars and pipes. 252.15 Section 252.15 Aeronautics and Space OFFICE OF THE SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS SMOKING ABOARD AIRCRAFT § 252.15 Cigars and pipes. Air carriers shall prohibit the smoking of...

  17. 46 CFR 58.16-17 - Piping and fittings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Piping and fittings. 58.16-17 Section 58.16-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-17 Piping and fittings...

  18. 46 CFR 182.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... must be so arranged as to prevent backflow of water from reaching engine exhaust ports under normal...

  19. 46 CFR 182.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... must be so arranged as to prevent backflow of water from reaching engine exhaust ports under normal...

  20. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  1. 49 CFR 192.115 - Temperature derating factor (T) for steel pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Temperature derating factor (T) for steel pipe. 192.115 Section 192.115 Transportation Other Regulations Relating to Transportation (Continued... § 192.115 Temperature derating factor (T) for steel pipe. The temperature derating factor to be used in...

  2. 49 CFR 192.115 - Temperature derating factor (T) for steel pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Temperature derating factor (T) for steel pipe. 192.115 Section 192.115 Transportation Other Regulations Relating to Transportation (Continued... § 192.115 Temperature derating factor (T) for steel pipe. The temperature derating factor to be used in...

  3. 49 CFR 192.115 - Temperature derating factor (T) for steel pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Temperature derating factor (T) for steel pipe. 192.115 Section 192.115 Transportation Other Regulations Relating to Transportation (Continued... § 192.115 Temperature derating factor (T) for steel pipe. The temperature derating factor to be used in...

  4. 49 CFR 192.115 - Temperature derating factor (T) for steel pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Temperature derating factor (T) for steel pipe. 192.115 Section 192.115 Transportation Other Regulations Relating to Transportation (Continued... § 192.115 Temperature derating factor (T) for steel pipe. The temperature derating factor to be used in...

  5. 49 CFR 192.328 - Additional construction requirements for steel pipe using alternative maximum allowable operating...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Additional construction requirements for steel pipe using alternative maximum allowable operating pressure. 192.328 Section 192.328 Transportation... Lines and Mains § 192.328 Additional construction requirements for steel pipe using alternative maximum...

  6. 49 CFR 192.115 - Temperature derating factor (T) for steel pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Temperature derating factor (T) for steel pipe. 192.115 Section 192.115 Transportation Other Regulations Relating to Transportation (Continued... § 192.115 Temperature derating factor (T) for steel pipe. The temperature derating factor to be used in...

  7. Estimating dynamic permeability in fractal pore network saturated by Maxwellian fluid

    NASA Astrophysics Data System (ADS)

    Sun, W.

    2017-12-01

    The frequency dependent flow of fluid in porous media is an important issue in geophysical prospecting. Oscillating flow in pipe leads to frequency dependent dynamic permeability and has been studied in pore network containing Newtonian fluid. But there is little work on oscillating complex fluid in pipe network, especially in irregular network. Here we formulated frequency dependent permeability for Maxwellian fluid and estimated the permeability in three-dimensional fractal network model. We consider an infinitely long cylindrical pipe with rigid solid wall. The pipe is filled with Maxwellian fluids. Based on the mass conservation equation, the equilibrium equation of force and Maxwell constitutive relationship, we formulated the flux by integration of axial velocity component over the pipe's cross section. Then we extend single pipe formulation to a 3D irregular network. Flux balance condition yields a set of linear equations whose unknowns are the fluid pressure at each node. By evaluating the total flow flux through the network, the dynamic permeability can be calculated.We investigated the dynamic permeability of brine and CPyCl/NaSal in a 3D porous sample with a cubic side length 1 cm. The pore network is created by a Voronoi cell filling method. The porosity, i.e., volume ratio between pore/pipe network and the overall cubic, is set as 0.1. The irregular pore network has a fractal structure. The dimension d of the pore network is defined by the relation between node number M within a sphere and the radius r of the sphere,M=rd.The results show that both brine and Maxwellian fluid's permeability maintain a stable value at low frequency, then decreases with fluctuating peaks. The dynamic permeability in pore networks saturated by Maxwellian fluid (CPyCl/NaSal (60 mM)) show larger peaks during the decline process at high frequency, which represents the typical resonance behavior. Dynamic permeability shows clear dependence on the dimension of the fractal network. Small-scale network has higher dimension than large-scale networks. The reason is that in larger networks pore and inter-pore connections are so dense that the probability P(r) to have a neighboring pore at distance r decays faster. The proposed model may be used to explain velocity dispersion in unconventional reservoir rocks observed in laboratory.

  8. Apparatus for draining lower drywell pool water into suppresion pool in boiling water reactor

    DOEpatents

    Gluntz, Douglas M.

    1996-01-01

    An apparatus which mitigates temperature stratification in the suppression pool water caused by hot water drained into the suppression pool from the lower drywell pool. The outlet of a spillover hole formed in the inner bounding wall of the suppression pool is connected to and in flow communication with one end of piping. The inlet end of the piping is above the water level in the suppression pool. The piping is routed down the vertical downcomer duct and through a hole formed in the thin wall separating the downcomer duct from the suppression pool water. The piping discharge end preferably has an elevation at or near the bottom of the suppression pool and has a location in the horizontal plane which is removed from the point where the piping first emerges on the suppression pool side of the inner bounding wall of the suppression pool. This enables water at the surface of the lower drywell pool to flow into and be discharged at the bottom of the suppression pool.

  9. LIQUID-LIQUID EXTRACTION COLUMNS

    DOEpatents

    Thornton, J.D.

    1957-12-31

    This patent relates to liquid-liquid extraction columns having a means for pulsing the liquid in the column to give it an oscillatory up and down movement, and consists of a packed column, an inlet pipe for the dispersed liquid phase and an outlet pipe for the continuous liquid phase located in the direct communication with the liquid in the lower part of said column, an inlet pipe for the continuous liquid phase and an outlet pipe for the dispersed liquid phase located in direct communication with the liquid in the upper part of said column, a tube having one end communicating with liquid in the lower part of said column and having its upper end located above the level of said outlet pipe for the dispersed phase, and a piston and cylinder connected to the upper end of said tube for applying a pulsating pneumatic pressure to the surface of the liquid in said tube so that said surface rises and falls in said tube.

  10. 75 FR 26716 - Seamless Refined Copper Pipe and Tube from the People's Republic of China: Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ...The Department of Commerce (the ``Department'') has preliminarily determined that seamless refined copper pipe and tube (``copper pipe and tube'') from the People's Republic of China (``PRC'') is being, or is likely to be, sold in the United States at less than fair value (``LTFV''), as provided in section 733 of the Tariff Act of 1930, as amended (the ``Act''). The estimated dumping margins are shown in the ``Preliminary Determination'' section of this notice. Interested parties are invited to comment on the preliminary determination.

  11. Depriming of arterial heat pipes: An investigation of CTS thermal excursions

    NASA Technical Reports Server (NTRS)

    Antoniuk, D.; Edwards, D. K.

    1980-01-01

    Four thermal excursions of the Transmitter Experiment Package (TEP) were the result of the depriming of the arteries in all three heat pipes in the Variable Conductance Heat Pipe System which cooled the TEP. The determined cause of the depriming of the heat pipes was the formation of bubbles of the nitrogen/helium control gas mixture in the arteries during the thaw portion of a freeze/thaw cycle of the inactive region of the condenser section of the heat pipe. Conditions such as suction freezeout or heat pipe turn-on, which moved these bubbles into the active region of the heat pipe, contributed to the depriming mechanism. Methods for precluding, or reducing the probability of, this type of failure mechanism in future applications of arterial heat pipes are included.

  12. Thermostructural applications of heat pipes

    NASA Technical Reports Server (NTRS)

    Peeples, M. E.; Reeder, J. C.; Sontag, K. E.

    1979-01-01

    The feasibility of integrating heat pipes in high temperature structure to reduce local hot spot temperature was evaluated for a variety of hypersonic aerospace vehicles. From an initial list of twenty-two potential applications, the single stage to orbit wing leading edge showed the greatest promise and was selected for preliminary design of an integrated heat pipe thermostructural system. The design consisted of a Hastelloy X assembly with sodium heat pipe passages aligned normal to the wing leading edge. A d-shaped heat pipe cross section was determined to be optimum from the standpoint of structural weight.

  13. Machined Titanium Heat-Pipe Wick Structure

    NASA Technical Reports Server (NTRS)

    Rosenfeld, John H.; Minnerly, Kenneth G.; Gernert, Nelson J.

    2009-01-01

    Wick structures fabricated by machining of titanium porous material are essential components of lightweight titanium/ water heat pipes of a type now being developed for operation at temperatures up to 530 K in high-radiation environments. In the fabrication of some prior heat pipes, wicks have been made by extruding axial grooves into aluminum unfortunately, titanium cannot be extruded. In the fabrication of some other prior heat pipes, wicks have been made by in-situ sintering of metal powders shaped by the use of forming mandrels that are subsequently removed, but in the specific application that gave rise to the present fabrication method, the required dimensions and shapes of the heat-pipe structures would make it very difficult if not impossible to remove the mandrels due to the length and the small diameter. In the present method, a wick is made from one or more sections that are fabricated separately and assembled outside the tube that constitutes the outer heat pipe wall. The starting wick material is a slab of porous titanium material. This material is machined in its original flat configuration to form axial grooves. In addition, interlocking features are machined at the mating ends of short wick sections that are to be assembled to make a full-length continuous wick structure. Once the sections have been thus assembled, the resulting full-length flat wick structure is rolled into a cylindrical shape and inserted in the heatpipe tube (see figure). This wick-structure fabrication method is not limited to titanium/water heat pipes: It could be extended to other heat pipe materials and working fluids in which the wicks could be made from materials that could be pre-formed into porous slabs.

  14. 21. COMPLETION OF INTAKE CONDUITS REVISED, PIPE SECTIONS AND PLANS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. COMPLETION OF INTAKE CONDUITS REVISED, PIPE SECTIONS AND PLANS, SHEET 117 OF 117, 1922. - Sacramento River Water Treatment Plant Intake Pier & Access Bridge, Spanning Sacramento River approximately 175 feet west of eastern levee on river; roughly .5 mile downstream from confluence of Sacramento & American Rivers, Sacramento, Sacramento County, CA

  15. 77 FR 23380 - Airworthiness Directives; Turbomeca S.A. Turboshaft Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... Airworthiness Directives; Turbomeca S.A. Turboshaft Engines AGENCY: Federal Aviation Administration (FAA), DOT....A. Arrius 2F turboshaft engines with P3 air pipe (first section) part number (P/N) 0 319 71 918 0... same inspections for installed engines, eliminates readjusting of the P3 air pipe (first section...

  16. Non-invasive fluid density and viscosity measurement

    DOEpatents

    Sinha, Dipen N [Los Alamos, NM

    2012-05-01

    The noninvasively measurement of the density and viscosity of static or flowing fluids in a section of pipe such that the pipe performs as the sensing apparatus, is described. Measurement of a suitable structural vibration resonance frequency of the pipe and the width of this resonance permits the density and viscosity to be determined, respectively. The viscosity may also be measured by monitoring the decay in time of a vibration resonance in the pipe.

  17. Influence of pre- and post-usage flushing frequencies on bacterial water quality of non-touch water fittings.

    PubMed

    Suchomel, Miranda; Diab-Elschahawi, Magda; Kundi, Michael; Assadian, Ojan

    2013-08-30

    Non-touch fittings have been reported to be susceptible for Pseudomonas aeruginosa accumulation. A number of factors may contribute to this, including the frequency of usage, duration of water stagnation, or presence of plastic materials. Programmable non-touch fittings are appearing which allow regular automated post-flushing with cold water to prevent water stagnation. However, the ideal duration of post-flushing is unknown as well as the effect of pre-rinsing with cold water before use. Eight non-touch fittings with brass valve blocks were mounted on a mobile test sink and connected to the same central water pipe source, differing only in presence or absence of water connection pipes, length of connection pipe, frequency of usage, and time intervals for pre- and post-usage water flush. The total bacteria colony-forming unit (cfu) counts were obtained by the spread plate technique. Low frequency of water use in combination with a long stagnating water column resulted in high bacterial cfu counts. Post-usage flushing for 2 seconds did not differ from no flushing. Flushing for 10 seconds with cold water after use or 30 seconds flush before use were both the most effective measures to prevent non-touch fittings from biofilm formation over a period of 20 weeks. Further improvements in water fitting technology could possibly solve the problem of bacterial water contamination in health care settings.

  18. 46 CFR 34.25-15 - Piping-T/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Piping-T/ALL. 34.25-15 Section 34.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Water Spray Extinguishing Systems, Details § 34.25-15 Piping—T/ALL. (a) All piping, valves and fittings shall meet the applicable...

  19. 46 CFR 34.10-15 - Piping-T/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Piping-T/ALL. 34.10-15 Section 34.10-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Fire Main System, Details § 34.10-15 Piping—T/ALL. (a) All piping, valves and fittings shall meet the applicable requirements of...

  20. 46 CFR 34.15-15 - Piping-T/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Piping-T/ALL. 34.15-15 Section 34.15-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 34.15-15 Piping—T/ALL. (a) The piping, valves, and fittings shall have a bursting...

  1. 46 CFR 34.10-15 - Piping-T/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Piping-T/ALL. 34.10-15 Section 34.10-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Fire Main System, Details § 34.10-15 Piping—T/ALL. (a) All piping, valves and fittings shall meet the applicable requirements of...

  2. 46 CFR 34.17-15 - Piping-T/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Piping-T/ALL. 34.17-15 Section 34.17-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Fixed Foam Extinguishing Systems, Details § 34.17-15 Piping—T/ALL. (a) All piping, valves, and fittings shall meet the applicable...

  3. 49 CFR 195.561 - When must I inspect pipe coating used for external corrosion control?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... corrosion control? 195.561 Section 195.561 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.561 When must I inspect pipe coating used for external corrosion control? (a) You must inspect all external pipe coating...

  4. 49 CFR 195.561 - When must I inspect pipe coating used for external corrosion control?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... corrosion control? 195.561 Section 195.561 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.561 When must I inspect pipe coating used for external corrosion control? (a) You must inspect all external pipe coating...

  5. 49 CFR 195.561 - When must I inspect pipe coating used for external corrosion control?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... corrosion control? 195.561 Section 195.561 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.561 When must I inspect pipe coating used for external corrosion control? (a) You must inspect all external pipe coating...

  6. 49 CFR 195.561 - When must I inspect pipe coating used for external corrosion control?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... corrosion control? 195.561 Section 195.561 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.561 When must I inspect pipe coating used for external corrosion control? (a) You must inspect all external pipe coating...

  7. 49 CFR 195.561 - When must I inspect pipe coating used for external corrosion control?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... corrosion control? 195.561 Section 195.561 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.561 When must I inspect pipe coating used for external corrosion control? (a) You must inspect all external pipe coating...

  8. 46 CFR 182.510 - Bilge piping system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...

  9. 46 CFR 182.510 - Bilge piping system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...

  10. Building a Copper Pipe "Xylophone."

    ERIC Educational Resources Information Center

    Lapp, David R.

    2003-01-01

    Explains how to use the equation for frequency of vibration of a transversely oscillating bar or pipe with both ends free to vibrate to build a simple and inexpensive xylophone from a 3-meter section of copper pipe. The instrument produces a full major scale and can be used to investigate various musical intervals. (Author/NB)

  11. Pipe crawler with extendable legs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.

    1991-04-02

    This invention is comprised of a pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing. between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair laying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is widemore » and the crawler can crawl through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler.« less

  12. Pipe crawler with extendable legs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zollinger, W.T.

    1992-06-16

    A pipe crawler for moving through a pipe in inchworm fashion having front and rear leg assemblies separated by air cylinders to increase and decrease the spacing between assemblies. Each leg of the four legs of an assembly is moved between a wall-engaging, extended position and a retracted position by a separate air cylinder. The air cylinders of the leg assemblies are preferably arranged in pairs of oppositely directed cylinders with no pair lying in the same axial plane as another pair. Therefore, the cylinders can be as long as a leg assembly is wide and the crawler can crawlmore » through sections of pipes where the diameter is twice that of other sections. The crawler carries a valving system, a manifold to distribute air supplied by a single umbilical air hose to the various air cylinders in a sequence controlled electrically by a controller. The crawler also utilizes a rolling mechanism, casters in this case, to reduce friction between the crawler and pipe wall thereby further extending the range of the pipe crawler. 8 figs.« less

  13. A loose bolt delays loading of Endeavour's external tank

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This view shows the pipe (center top) leading toward Endeavour from the side of the White Room at Launch Pad 39B. A loose bracket observed hanging down from the pipe delayed loading of Endeavour's external tank by several hours to allow technicians to remove it. A 'U' bolt connects the bracket to a fire suppression water line attached to the exterior of the White Room. The loose bolt could have possibly created a debris hazard.

  14. The bacteriological composition of biomass recovered by flushing an operational drinking water distribution system.

    PubMed

    Douterelo, I; Husband, S; Boxall, J B

    2014-05-01

    This study investigates the influence of pipe characteristics on the bacteriological composition of material mobilised from a drinking water distribution system (DWDS) and the impact of biofilm removal on water quality. Hydrants in a single UK Distribution Management Area (DMA) with both polyethylene and cast iron pipe sections were subjected to incremental increases in flow to mobilise material from the pipe walls. Turbidity was monitored during these operations and water samples were collected for physico-chemical and bacteriological analysis. DNA was extracted from the material mobilised into the bulk water before and during flushing. Bacterial tag-encoded 454 pyrosequencing was then used to characterize the bacterial communities present in this material. Turbidity values were high in the samples from cast iron pipes. Iron, aluminium, manganese and phosphate concentrations were found to correlate to observed turbidity. The bacterial community composition of the material mobilised from the pipes was significantly different between plastic and cast iron pipe sections (p < 0.5). High relative abundances of Alphaproteobacteria (23.3%), Clostridia (10.3%) and Actinobacteria (10.3%) were detected in the material removed from plastic pipes. Sequences related to Alphaproteobacteria (22.8%), Bacilli (16.6%), and Gammaproteobacteria (1.4%) were predominant in the samples obtained from cast iron pipes. The highest species richness and diversity were found in the samples from material mobilised from plastic pipes. Spirochaeta spp., Methylobacterium spp. Clostridium spp. and Desulfobacterium spp., were the most represented genera in the material obtained prior to and during the flushing of the plastic pipes. In cast iron pipes a high relative abundance of bacteria able to utilise different iron and manganese compounds were found such as Lysinibacillus spp., Geobacillus spp. and Magnetobacterium spp. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Water-hammer pressure waves interaction at cross-section changes in series in viscoelastic pipes

    NASA Astrophysics Data System (ADS)

    Meniconi, S.; Brunone, B.; Ferrante, M.

    2012-08-01

    In view of scarcity of both experimental data and numerical models concerning transient behavior of cross-section area changes in pressurized liquid flow, the paper presents laboratory data and numerical simulation of the interaction of a surge wave with a partial blockage by a valve, a single pipe contraction or expansion and a series of pipe contraction/expansion in close proximity.With regard to a single change of cross-section area, laboratory data point out the completely different behavior with respect to one of the partially closed in-line valves with the same area ratio. In fact, for the former the pressure wave interaction is not regulated by the steady-state local head loss. With regard to partial blockages, transient tests have shown that the smaller the length, the more intense the overlapping of pressure waves due to the expansion and contraction in series.Numerically, the need for taking into account both the viscoelasticity and unsteady friction is demonstrated, since the classical water-hammer theory does not simulate the relevant damping of pressure peaks and gives rise to a time shifting between numerical and laboratory data. The transient behavior of a single local head loss has been checked by considering tests carried out in a system with a partially closed in-line valve. As a result, the reliability of the quasi steady-state approach for local head loss simulation has been demonstrated in viscoelastic pipes. The model parameters obtained on the basis of transients carried out in single pipe systems have then been used to simulate transients in the more complex pipe systems. These numerical experiments show the great importance of the length of the small-bore pipe with respect to one of the large-bore pipes. Precisely, until a gradually flow establishes in the small-bore pipe, the smaller such a length, the better the quality of the numerical simulation.

  16. 24 CFR 3280.706 - Oil piping systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Standard Specification for Seamless Copper Water Tube, ASTM B88-93, or shall comply with ASTM B280... supply connection(s) shall be rigidly anchored to a structural member within 6 inches of the supply... shall be checked for oil leaks with fuel oil of the same grade that will be burned in the appliance. No...

  17. Power tong torque control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buck, D.A.; James, R.N.

    1987-10-20

    Torque controlled powered pipe tongs, are described the apparatus comprises: (a) a power tong powered by a fluid motor; (b) a fluid power source connected to the motor; (c) a force conducting element attached to the power tong, situated to oppose reaction torque from the tongs when torque is applied to pipe; (d) force sensing means operatively associated with the force conducting element situated to sense at least part of the force experienced by the force conducting element, arranged to produce a pressure signal proportional to force sensed; and (e) a fluid by-pass valve, adjustably biased toward a closed position,more » responsive to the signal to tend to move toward an open position, the by-pass valve connected between the fluid power source and the motor.« less

  18. Light as a key driver of freshwater biofouling surface roughness in an experimental hydrocanal pipe rig.

    PubMed

    Ravizza, Matilde; Giosio, Dean; Henderson, Alan; Hovenden, Mark; Hudson, Monica; Salleh, Sazlina; Sargison, Jane; Shaw, Jennifer L; Walker, Jessica; Hallegraeff, Gustaaf

    2016-07-01

    Biofouling in canals and pipelines used for hydroelectric power generation decreases the flow capacity of conduits. A pipeline rig was designed consisting of test sections of varying substrata (PVC, painted steel) and light levels (transparent, frosted, opaque). Stalk-forming diatoms were abundant in both the frosted and transparent PVC pipes but negligible in the painted steel and opaque PVC pipes. Fungi were slightly more abundant in the painted steel pipe but equally present in all the other pipes while bacterial diversity was similar in all pipes. Photosynthetically functional biofouling (mainly diatoms) was able to develop in near darkness. Different biological fouling compositions generated differing friction factors. The highest friction factor was observed in the transparent pipe (densest diatom fouling), the lowest peak friction for the opaque PVC pipe (lowest fouling biomass), and with the painted steel pipe (high fouling biomass, but composed of fungal and bacterial crusts) being intermediate between the opaque and frosted PVC pipes.

  19. Chemical laser exhaust pipe design research

    NASA Astrophysics Data System (ADS)

    Sun, Yunqiang; Huang, Zhilong; Chen, Zhiqiang; Ren, Zebin; Guo, Longde

    2016-10-01

    In order to weaken the chemical laser exhaust gas influence of the optical transmission, a vent pipe is advised to emissions gas to the outside of the optical transmission area. Based on a variety of exhaust pipe design, a flow field characteristic of the pipe is carried out by numerical simulation and analysis in detail. The research results show that for uniform deflating exhaust pipe, although the pipeline structure is cyclical and convenient for engineering implementation, but there is a phenomenon of air reflows at the pipeline entrance slit which can be deduced from the numerical simulation results. So, this type of pipeline structure does not guarantee seal. For the design scheme of putting the pipeline contract part at the end of the exhaust pipe, or using the method of local area or tail contraction, numerical simulation results show that backflow phenomenon still exists at the pipeline entrance slit. Preliminary analysis indicates that the contraction of pipe would result in higher static pressure near the wall for the low speed flow field, so as to produce counter pressure gradient at the entrance slit. In order to eliminate backflow phenomenon at the pipe entrance slit, concerned with the pipeline type of radial size increase gradually along the flow, flow field property in the pipe is analyzed in detail by numerical simulation methods. Numerical simulation results indicate that there is not reflow phenomenon at entrance slit of the dilated duct. However the cold air inhaled in the slit which makes the temperature of the channel wall is lower than the center temperature. Therefore, this kind of pipeline structure can not only prevent the leak of the gas, but also reduce the wall temperature. In addition, compared with the straight pipe connection way, dilated pipe structure also has periodic structure, which can facilitate system integration installation.

  20. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Ian Harris

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforcedmore » composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.« less

Top